Supplementary Pack 1

Argyll and Bute Council · 20 March 2025
Back to Environment, Development and Infrastructure Committee — 20 March 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
14 March 2025 
SUPPLEMENTARY PACK 1 
ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE COMMITTEE - ON A HYBRID
BASIS IN THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD AND BY MICROSOFT
TEAMS on THURSDAY, 20 MARCH 2025 at 11:00 AM 
I enclose herewith item 11 (ROADS CAPITAL RECONSTRUCTION PROGRAMME - 2025/26)
which was marked to follow on the Agenda for the above meeting. 
Douglas Hendry
Executive Director 
ITEM TO FOLLOW 
11. ROADS CAPITAL RECONSTRUCTION PROGRAMME - 2025/26 (Pages 3 - 16)  
Report by Executive Director with responsibility for Road and Infrastructure Services 
Environment, Development and Infrastructure Committee 
Councillor John Armour (Chair) Councillor Jan Brown
Councillor Graham Hardie Councillor Willie Hume
Councillor Andrew Kain Councillor Jim Lynch
Councillor Tommy MacPherson Councillor Ian MacQuire
Councillor Luna Martin Councillor Liz McCabe
Councillor Ross Moreland (Vice-Chair) Councillor Gary Mulvaney
Councillor Alastair Redman Councillor William Sinclair
Councillor Andrew Vennard Councillor Peter Wallace   
Contact: Katie McKenzie, Committee Services Officer   Tel: 01546 604465
Public Document Pack

Page 2

This page is intentionally left blank

Page 3

ARGYLL AND BUTE COUNCIL                  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
ROADS AND INFRASTRUCTURE                   20 MARCH 2025
SERVICES                     
ROADS CAPITAL RECONSTRUCTION PROGRAMME 2025/26 
1.0  EXECUTIVE SUMMARY 
1.1 The Roads Reconstruction Programme has been structured in line with the
Roads Asset Management and Maintenance Strategy. In previous years, the
focus has been to arrest the rate of decline and provide an overall improvement
in condition with an average Capital expenditure annually of £7.2M over the last
decade. 
1.2 In previous years this has been achieved through the delivery of a mix of
carriageway resurfacing, edge strengthening, patching/surface dressing and in-
situ road surface recycling. These treatments have been designed to seal the
road to stop the ingress of water, improve ride quality and reduce the number of
reactive repairs. Without this investment and work there would have been a
significant deterioration in conditions and a detriment to the travelling public,
economic opportunity and tourism. 
1.3 With the agreed funding award for 2025-26 at £10M this will allow the previous
good work to continue. However, within the funding package we now have a
requirement to fund the recovery cost from Storm Eowyn, at present these
works are still being assessed, however £2M has been allocated within the
overall package for this section of work. 
1.4 Attached to this report is a draft programme for roads reconstruction funded
treatments for 2025/26. The site-specific details are currently being assessed on
site during March 2025 for an April/May commencement. This includes as per
previous years a £2M Surface Dressing Operation delivered through an external
contract which is at the tender stage at present. 
1.5 Officers use a number of sources of information along with their professional
engineering judgement to ensure that maximum benefit can be derived from the
available investment. 
1.6 As per previous years, any post winter deterioration may result in some
adjustment to the programme to ensure that the best rates of return in terms of
whole life costs can be achieved. 
Page 3 Agenda Item 11

Page 4

1.7 It is recommended that the Environment, Development and Infrastructure
Committee:- 
• Endorses the proposed capital works for 2025/26. 
• Agrees to allocate £2m to the repair of roads and coastal assets damaged
by Storm Eowyn in January 2025 and to a delegation to the Executive
Director with responsibility for Roads and Infrastructure Services in
consultation with the Policy Lead for Roads, Transport and Amenity Services
to finalise scheme specific budget allocations for these works.
• Agrees that details of each Area Committee’s Capital Works will be
forwarded to individual Elected Members.   
Page 4

Page 5

ARGYLL AND BUTE COUNCIL                  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
ROADS AND INFRASTRUCTURE                  20 MARCH 2025
SERVICES                     
ROADS CAPITAL RECONSTRUCTION PROGRAMME 2025/26 
2.0  INTRODUCTION 
2.1 This report provides details of the proposed roads reconstruction programme for
2025/26. 
2.2 On average recent capital investment for our roads has been £7.2M per annum.
This year, the Scottish Collaboration of Transportation Specialists (SCOTS) has
indicated that to keep our network from deteriorating we need to spend £14M
(this has risen from last year’s £11M and previous years £8M due to inflationary
cost increases to fuel, vehicles, materials and staff costs in particular). This
year’s investment of £10M is well in excess of previous years’ funding at a time
of continued financial pressure on Council budgets. 
2.3 The value of undertaking adequate preventative maintenance works cannot be
overstated. It is the most vital and fundamental function required to extend
infrastructure service life, strengthen network resilience, and minimise demand
for capital investment and reactive revenue funded maintenance in the long
term. Sustained funding at adequate levels across multiple years is required to
enable effective long term asset maintenance and prevent a decline in the
condition of the road network. 
3.0  RECOMMENDATION 
3.1 It is recommended that the Environment, Development and Infrastructure
Committee:-   
• Endorses the proposed capital works for 2025/26. 
• Agrees to allocate £2m to the repair of roads and coastal assets damaged
by Storm Eowyn in January 2025 and to a delegation to the Executive
Director with responsibility for Roads and Infrastructure Services in
consultation with the Policy Lead for Roads, Transport and Amenity Services
to finalise scheme specific budget allocations for these works.
• Agrees that details of each Area Committee’s Capital Works will be
forwarded to individual Elected Members.   
Page 5

Page 6

4.0  DETAIL 
4.1  The focus of the roads reconstruction programme previously has been to
recover the network through the delivery of a mix of carriageway resurfacing
schemes, patching/surface dressing and in-situ road surface recycling, which
follow the principles set out within the Roads Asset Management Plan. 
4.2  This Council has approximately £122M of backlog maintenance (based on
figures produced by SCOTS) across the road network. This means that over
£122M would need to be invested to bring the road network up to an ‘A1’
standard. Most Councils are in a very similar position. During these challenging
financial times, it is very unlikely we will benefit from the level of investment
required to bring the road network up to an ‘A1’ condition. However, over the last
decade there has been a carefully applied strategy of delivering revenue and
capital funding collectively and delivering a series of works designed to minimise
reactive work, carry out right first-time repairs wherever possible and to deliver
surfacing techniques and specifications which maximise the amount of repairs
and resurfacing which can be delivered within the available budget. The
investment levels that the Council has made over a number of years have made
a positive impact on the Council’s road condition. This has been detailed in the
Road Condition Index which is included in the Annual Status and Options report. 
4.3  Officers have prepared a high-level programme based on historical percentage
splits for the majority of the funding which will include Surface Dressing,
Bituminous Surfacing Inlays and Overlays as well as improvements to culverts
and ditches to keep water from running across the road surface and causing
future damage particularly in the winter. This is all predicated on a sustained
level of future funding which will allow the network conditions to improve. 
4.4  Capital and Revenue programmes will continue to be delivered side by side
allowing a holistic view of roads maintenance to be applied whilst ensuring that
capital monies are invested within the permitted parameters expected by Audit
Scotland. 
4.5 The RCI survey data will categorise sections of roads from red to green, with red
being in worst condition and green not requiring attention. In line with industry
best practice, investment is not necessarily concentrated on all the red roads but
instead has been aligned to focus on a combination of red and amber roads to
arrest deterioration. This effectively provides a stitch-in-time approach and
ensures that we get the best rate of return from the investment available. Red
roads are roads requiring attention currently, amber roads are roads which will
require attention in the not-too-distant future and green roads are roads which
require no attention. Previously by progressing schemes which will provide the
best rate of return, taking into consideration the survey results and associated
data, the Council has been able to deliver a programme of schemes which
maximises the benefits to the travelling public from the available investment.
There is also a consideration applied that reflects route classification and
hierarchy together with the Road Condition Index. 
Page 6

Page 7

4.6  Surface dressing schemes are selected on the basis that either the skid
resistance of the road surface is poor, or the road surface requires sealing before
it fails. Surface dressing can range from a standard binder with 6mm chippings
through to polymer modified binders with more than one layer of chippings. 
4.7  As can be demonstrated in the below table, over the last 10 years, where the
Council has seen average investment of at least £8 Million, combined across
both capital and revenue, on Roads Reconstruction, we have been able to
slightly improve the road condition which in turn improves the experience of
visitors, businesses and our community’s daily commute. The externally
delivered RCI has now been carried out in full and covers our network on
islands previously missed over the last 3 years (which have amongst the most
challenging roads to maintain), this has led to a corrected RCI score of
50.77%. 
Year Capital &
Revenue
Survey year RCI
2014-15  £8,896,996  2014-16  54.4 
2015-16  £6,799,499  2015-17  55.3 
2016-17  £5,821,104  2016-18  55.5 
2017-18  £5,233,219  2017-19  54.4 
2018-19  £11,502,343 2018-20  54.17 
2019-20 £9,472,398 2019-21 54.2
2020-21 £8,426,346 2020-22 52.5
2021-2022 £12,415,060 2021-23 49.8
2022-2023 £10,809,660 2022-24 50.77
2023-2024 £11,072,273 2023-25 tbc*
Average Spend  £9,044,890 Average  53.45* 
4.8  In 2024/25 there was no grant from the Strategic Timber Transport Scheme
(STTS). This funding was previously used to match the existing funded schemes
on the Council network where timber extraction was programmed to be carried
out. It is officers’ intention to make further bids to the STTS for 2025/26 which, if
successful, will provide additional investment for the road network. However, it is
understood that on a national level the STTS has significantly less funding
available in future years to support bids from Local Authorities.
4.9  The capital works presented are based on the carriageway condition in late
autumn/early winter and also take into account recent damage to the road
network caused by Strom Eowyn in January. Another report being considered
by this Committee today outlines in further detail the repair works required to
road and coastal assets as a result of Storm Eowyn, for the purposes of the
Page 7

Page 8

Roads Reconstruction Programme it is recommended that an allowance of £2m
be included for these works. As the assessment of repair options for these
works is not yet complete it is proposed that the finalisation of repair works and
scheme budget allocations for these be delegated to Executive Director in
consultation with the Head of Roads and Infrastructure and the Policy Lead for
Roads, Transport and Amenity Services and reported to a subsequent meeting
of this Committee. With the effect of winter, the work may need to be adjusted to
ensure that any investment takes into consideration any winter deterioration that
has taken place subsequent to the carriageway assessments in late
autumn/early winter. 
4.10  Once the full capital budget has been confirmed, the work for each of the
administrative areas will be forwarded to Area Committee Members and updates
to Area Committees as the works progress. 
5.0  CONCLUSION 
5.1  This report provides details of the proposed roads reconstruction works for
2025/26. 
6.0  IMPLICATIONS 
6.1  Policy - Works assessed and carried out under the current Roads Asset 
Management Plan. 
6.2  Financial - Works will be based on £10M capital allocation for year 2025/26. 
6.3  Legal – None known. 
6.4  HR - Reconstruction works delivered by a combination of in-house roads 
operations team with minimal use sub-contractors. 
6.5  Fairer Scotland Duty: None known. 
6.5.1  Equalities - protected characteristics – None known. 
6.5.2  Socio-economic Duty – None known. 
6.5.3  Islands – None known. 
6.6  Climate Change – Due regard will be given to climate change with a view to 
minimising any climate change impact and these will be considered as and 
when they arise. 
6.7  Risk - Completed works will reduce the requirement to repair roads and will arrest 
the carriageway/footway deterioration. 
6.8  Customer Service - Overall improvement in road surfaces and the quality of 
driven journeys.
Page 8

Page 9

6.9 The Rights of the Child (UNCRC) – The investment to improve our road network
will contribute to a safer environment for young people to thrive in. 
Executive Director with responsibility for Roads and Infrastructure: Kirsty Flanagan 
Policy Lead for Roads, Transport and Amenity Services: Councillor John Armour 
March 2025  
For further information contact: 
Stephen Hall, Interim Head of Roads and Infrastructure Service
stephen.hall@argyll-bute.gov.uk 
Hugh O’Neill, Network and Standards Manager
hugh.o’neill@argyll-bute.gov.uk 
Tom Murphy, Operations Manager
tom.murphy@argyll-bute.gov.uk 
APPENDICES   
Appendix 1 – Capital Funding works for £10M 
Appendix 2a – Mid-Argyll, Kintyre and Islands
Appendix 2b – Oban, Lorn and the Isles
Appendix 2c – Bute and Cowal 
Appendix 2d – Helensburgh and Lomond 
Page 9

Page 10

This page is intentionally left blank

Page 11

APPENDIX - 1
2025-26 ROADS RECONSTRUCTION  -  CAPITAL BUDGET OPTIONS  SUMMARY
10,000,000£         Council  Award 27th  February 2025
CONTINGENCY ALLOWANCE FOR STORM EOWYN RECTIFICATION
2,000,000£           Coastal damage rectification, Rock Armour , Seawalls and associated land stabilisation
Specific scheme assessment matrix - dealt with separately - MARCH 2025
CARRIAGEWAY TREATMENT BUDGET  - 2025-26
8,000,000£           budget 2025-26 219,323 Sq.m. Carriageway Surfacing
Incorporating
2,000,000£       Surface Dressing - laying
344,680 Sq.m. of carriageway - SD
Externally provided - specialist contractor
MAKI = 31% 2,480,000£           Area Budget share of  £8M
Split 33/33/34
Mid-Argyll 818,400£              district allocation of £8M budget
Carriageway Inlay & Overlay - inc Drainage - Schemes lists App-2a 17,200 sq.m. 574,080.00£     
Drainage Enlarge culverts 2.5% :  Enhanced Ditches 2.5% 810 lin m 40,920.00£       
Surface Dressing PSD & SD   -    Schemes lists  - App-2 a 33,900 sq.m. 203,400.00£     
District total estimate 818,400.00£     
Kintyre 818,400£              district allocation of £8M budget
Carriageway Inlay & Overlay - inc Drainage - Schemes lists App-2a 25,827 sq.m. 571,200.00£     
Drainage Enlarge culverts 2.5% :  Enhanced Ditches 2.5% 810 lin m 40,920.00£       
Surface Dressing PSD & SD   -    Schemes lists  - App-2a 34,380 sq.m. 206,280.00£     
District total estimate 818,400.00£     
& Islands 843,200£              district allocation of £8M budget
Carriageway Inlay & Overlay - inc Drainage - Schemes lists App-2a 21,700 sq.m. 589,642.00£     
Drainage Enlarge culverts 2.5% :  Enhanced Ditches 2.5% 840 lin m 42,160.00£       
Surface Dressing PSD & SD   -    Schemes lists  - App-2a 35,233 sq.m. 211,398.00£     
District total estimate 843,200.00£     
OLI = 35% 2,800,000£           Area Budget share of  £8M
split 55/45
Oban- Lorn 1,540,000£           district allocation of £8M budget
Carriageway Inlay & Overlay - inc Drainage - Schemes lists App-2b 44,150 sq.m. 943,000.00£     
Drainage Enlarge culverts 2.5% :  Enhanced Ditches 2.5% 1,540 lin m 77,000.00£       
Surface Dressing PSD & SD   -    Schemes lists  - App-2 b 93,000 sq.m. 520,000.00£     
District total estimate 1,540,000.00£  
& The Isles 1,260,000£           district allocation of £8M budget
Carriageway Inlay & Overlay - inc Drainage - Schemes lists App-2b 43,000 sq.m. 987,000.00£     
Drainage Enlarge culverts 2.5% :  Enhanced Ditches 2.5% 1,260 lin m 63,000.00£       
Surface Dressing PSD & SD   -    Schemes lists  - App-2b 35,000 sq.m. 210,000.00£     
District total estimate 1,260,000.00£  
B&C = 20% 1,600,000£           Area Budget share of  £8M
split  70/30
Cowal 1,120,000£           district allocation of £8M budget
Carriageway Inlay & Overlay - inc Drainage - Schemes lists App-2c 24,540 sq.m. 784,000.00£     
Drainage Enlarge culverts 2.5% :  Enhanced Ditches 2.5% 1,120 lin m 56,000.00£       
Surface Dressing PSD & SD   -    Schemes lists  - App-2 c 46,667 sq.m. 280,000.00£     
District total estimate 1,120,000.00£  
Bute 480,000£              district allocation of £8M budget
Carriageway Inlay & Overlay - inc Drainage - Schemes lists App-2c 10,360 sq.m. 336,000.00£     
Drainage Enlarge culverts 2.5% :  Enhanced Ditches 2.5% 480 lin m 24,000.00£       
Surface Dressing PSD & SD   -    Schemes lists  - App-2c 20,000 sq.m. 120,000.00£     
District total estimate 480,000.00£     
H & L = 14% 1,120,000£           Area Budget share of  £8M
Lomond Carriageway Inlay & Overlay - inc Drainage - Schemes lists App-2d 32,546 sq.m. 784,000.00£     
Drainage Enlarge culverts 2.5% :  Enhanced Ditches 2.5% 1,120 lin m 56,000.00£       
Surface Dressing PSD & SD   -    Schemes lists  - App-2d 46,500 sq.m. 280,000.00£     
District total estimate 1,120,000.00£  
Page 11

Page 12

APPENDIX - 2a
CARRIAGEWAY TREATMENT BUDGET  - 2025-26 Mid-ARGYLL , KINTYRE and ISLANDS
8,000,000£             Network allocation
64,227 sq.m. Surfacing
MAKI = 31% 2,480,000£             Area Budget share of  £8M 103,513 sq.m. Surface Dressing
Split 33/33/34
Mid-Argyll 818,400£                district allocation of £8M budget Treatment Quantity Unit Estimated Value
33% Carriageway A819  ELECTRIC COTTAGE PH 5 Widening and Drainage Structural 200 lin.m. 150,000.00£        
Bituminous A816 Rhudle Mill straight Overlay 4,200 sq.m. 60,000.00£          
Surfacing B841 Cairnbaan bridge -A816 junction Inlay 2,200 sq.m. 80,000.00£          
Inlay & overlay B8025 Bellanoch - Barluagan Junction  - Pre SD  (Future yrs) Edge/Overlay 2,400 sq.m. 90,000.00£          
B8025 Bellanoch between bridges   Pre-SD  (Future years) Patching 200 sq.m. 10,000.00£          
B8025 West of Golf Course  ( budget fit) Overlay 2,800 sq.m. 56,080.00£          
Ardrishaig - West Canal Rd Overlay 1,000 sq.m. 20,000.00£          
Crinnan  - Above canal car park  Pre-SD Future Years Patching 400 sq.m. 20,000.00£          
Bridges - c/w Ardrishaig  - Lock 4 Bridge deck - road surface Surface  Seal 200 sq.m. 10,000.00£          
B8025Bellanoch Bridge deck - road surface Surface  Seal 100 sq.m. 5,000.00£           
Pre SD A816  South of Ardfern Junction Patching 1,000 sq.m. 20,000.00£          
patching Inveraray Streets Patching 1,500 sq.m. 30,000.00£          
UC51 Silvercraigs Patching 300 sq.m. 6,000.00£           
UC18 Drimvore Patching 700 sq.m. 17,000.00£          
Surface Dressing B8002 - Ardfern   ( A816 to Hotel) Surface Treat 11,000 sq.m. 66,000.00£          
laying Inveraray Streets Surface Treat 8,400 sq.m. 50,400.00£          
A816   South of Ardfern Junction Surface Treat 4,000 sq.m. 24,000.00£          
Dunadd  ( A816 to Bridge) Surface Treat 1,800 sq.m. 10,800.00£          
UC18 Drimvore  (A816 to Bridge) Surface Treat 6,400 sq.m. 38,400.00£          
UC51 Silvercraigs - full length Surface Treat 2,300 sq.m. 13,800.00£          
Drainage CULVERT Enlargement and Headwall improvements Pipework 41 lin.m. 20,460.00£          
upgrade DITCH  Reprofiling  (including Verge clearanace) Excavation 810 lin.m. 20,460.00£          
District total estimate 818,400.00£        
Kintyre 818,400£                district allocation of £8M budget Treatment Quantity Unit Estimated Value
33% Carriageway Dalsmirren Rd.  -  Edge Strengethening structural 1,400 sq.m 60,000.00£          
Bituminous Campbeltown  -  New Quay St onto Kilkerran Rd Inlay 750 sq.m 30,000.00£          
Surfacing Campbeltown ‐ Stewart Rd Inlay 1,200 sq.m 36,000.00£          
Inlay & overlay Campbeltown  ‐ Saint John Street Inlay 1,267 sq.m 38,000.00£          
UC17 Tangy   (Inc drainage iprovements) Overlay 1,600 sq.m 60,000.00£          
Campbeltown - C19 Argyll Street Inlay 1,550 sq.m 35,000.00£          
Campbeltown - Fort Argyll Road/Keith Cresent Inlay 1,400 sq.m 29,900.00£          
Campbeltown - Glebe Street Inlay 2,200 sq.m 76,000.00£          
B842  Stewarton Junction Inlay 1,000 sq.m 20,000.00£          
(C20)  Glenbarr cottages   PreSD   (Future years) Patching 480 sq.m 10,000.00£          
C20  Glenbarr PreSD ( Future Years) Patching 4,500 sq.m 30,000.00£          
C19  Glenramskil/Kilkerran road  Pre SD ( Future years) Patching 8,000 sq.m 80,000.00£          
Pre SD  -  patch South of Stewarton - including Large Culvert replacement Patching 480 sq.m 66,300.00£          
Surface Dressing B843 East of Machrihanish 30mph to Caravan Park Surface Treat 5,000 sq.m 30,000.00£          
laying B842 South of Stewarton 30mph to Dalsmirren Junction Surface Treat 20,880 sq.m 125,280.00£        
UC17  Gobbagrennan  -  Phase 2 northern section to end. Surface Treat 8,500 sq.m 51,000.00£          
Drainage CULVERT Enlargement and Headwall improvements Pipework 41 lin.m. 20,460.00£          
upgrade DITCH  Reprofiling  (including Verge clearanace) Excavation 810 lin.m. 20,460.00£          
District total estimate 818,400.00£        
& Islands 843,200£                district allocation of £8M budget Treatment Quantity Unit Estimated Value
34% Carriageway B8016 - High Road, N & S of Laggan bridge Patching 500 sq.m 50,000.00£          
Bituminous B8016 - South of Glenegadale Machine Patch 2,000 sq.m 50,000.00£          
Surfacing A847 - Port Charlotte, Hotel Inlay 2 layers 500 sq.m 30,000.00£          
Inlay & overlay A847 - Port Ellen to B8016 junction Patching 400 sq.m 40,000.00£          
A847 - Bruichladdich Inlay 2 layers 400 sq.m 25,000.00£          
C17 - Emeraval to Kilnaughton Overlay 3,000 sq.m 65,000.00£          
A846 - Port Ellen School -  Traffic Calming Inlay 2 layers 300 sq.m 25,000.00£          
UC25 Emeraval link road Overlay 2,400 sq.m 60,000.00£          
JURA  -  A846 - Ardmenish flats Overlay 3,200 sq.m 100,000.00£        
JURA -  A846 - selective repairs -  ( Budget Fit) Overlay 1,500 sq.m 44,642.00£          
COLONSAY  - B8085 South Road   (jetpatcher ) Patching 1,000 sq.m 20,000.00£          
Pre SD C14  Ardtalla road -  Jetpatcher PSD 2025 Patching 2,000 sq.m 20,000.00£          
patching Ballygrant - Kilmenny - jetpatcher  PSD 2025 Patching 3,000 sq.m 30,000.00£          
A846  Low road - hot bitumen regulating - PSD 2025 Patching 1,500 sq.m 30,000.00£          
Surface Dressing C14 Ardtalla road   - Ardbeg to Kildalton straight Surface Treat 17,600 sq.m 105,600.00£        
laying A846 Ballygrant to Kilmenny Surface Treat 9,233 sq.m 55,398.00£          
A846 Low Road  -Bowmore - Pt Ellen - Selected locations Surface Treat 8,400 sq.m 50,400.00£          
Drainage CULVERT Enlargement and Headwall improvements Pipework 42 lin.m. 21,080.00£          
upgrade DITCH  Reprofiling  (including Verge clearanace) Excavation 840 lin.m. 21,080.00£          
District total estimate 843,200.00£        
Page 12

Page 13

APPENDIX - 2b
CARRIAGEWAY TREATMENT BUDGET  - 2025-26 OBAN , LORN and the ISLES
8,000,000£            Network allocation
85,150 sq.m. Surfacing
OLI = 35% 2,800,000£            Area Budget share of  £8M 128,000 sq.m. Surface Dressing
split 55/45
Oban- Lorn 1,540,000£            district allocation of £8M budget Treatment Quantity Unit Estimated Value
55% Carriageway A816 Blaran (Oude)  PH 5 - Regulate and Overlay Overlay 3,250 sq.m. £            65,000.00
Bituminous A819 Cladich PH 4 - Regulate and Overlay Overlay 3,250 sq.m. £            65,000.00
Surfacing C29 Kilmelford Hill Road Overlay 2,500 sq.m. £            50,000.00
Inlay & overlay B845 Bonawe Road Ardchatten Overlay 2,500 sq.m. £            50,000.00
C34 Gallanach Overlay 1,250 sq.m. £            25,000.00
U18 Kilmore Overlay 1,750 sq.m. £            35,000.00
C35 Luing Overlay 4,000 sq.m. £            80,000.00
A816 Soroba Road - Inlay Inlay 2,500 sq.m. £            50,000.00
B844 Balvicar  - Clachan Dubh Farm Overlay 3,000 sq.m. £            60,000.00
B845 Glen Nant Overlay 2,500 sq.m. £            50,000.00
U63 Monument Hill Road Overlay 2,000 sq.m. £            40,000.00
U14 Benvoullin Road - inlay Inlay 2,000 sq.m. £            40,000.00
U18 Rockfield Road - inlay Inlay 1,500 sq.m. £            30,000.00
U24 Hayfield Overlay 1,500 sq.m. £            30,000.00
C34 Glencruitten Road Overlay 2,500 sq.m. £            50,000.00
Crannaig A Mhinister Oban - inlay Inlay 2,500 sq.m. £            50,000.00
Station Road, Oban - inlay Inlay 2,500 sq.m. £            50,000.00
Oban Junctions  ( budget fit) - inlay Inlay 1,150 sq.m. £            23,000.00
Pre SD Pre SD  -  Musdale/Scammadale post winter Patching 700 sq.m. £            35,000.00
patching Pre-SD   2025    C33  Lerags Patching 700 sq.m. £            35,000.00
Pre-SD   2025    A816 Patching 600 sq.m. £            30,000.00
Surface Dressing U25 Muasdale - full length Surface Treat 25,000 sq.m. 140,000.00£          
laying C33 Lerags Road - full length Surface Treat 15,000 sq.m. 85,000.00£            
U14 Scammadale  - full length Surface Treat 23,000 sq.m. 130,000.00£          
A816 Kilninver 30mph to Blaran  (Reara Forest lay-by) Surface Treat 30,000 sq.m. 165,000.00£          
Drainage CULVERT Enlargement and Headwall improvements Pipework 77 lin.m. 38,500.00£            
upgrade DITCH  Reprofiling  (including Verge clearanace) Excavation 1,540 lin.m. 38,500.00£            
District total estimate 1,540,000.00£       
& The Isles 1,260,000£            district allocation of £8M budget Treatment Quantity Unit Estimated Value
45% Carriageway TIREE - U61 Milton Road Overlay 4,020 sq.m. £            80,000.00
Bituminous TIREE - U69 Croft View Overlay 680 sq.m. £            20,000.00
Surfacing TIREE - U32 Moss Road Overlay 1,800 sq.m. £            50,000.00
Inlay & overlay MULL -  C49 Achnahard Overlay 1,740 sq.m. £            40,000.00
A849 Pennygowan to Timber Pier C/way Regulating Overlay 5,430 sq.m. £          125,000.00
A849 Salen to Pennygowan Overlay 5,430 sq.m. £          125,000.00
A884 Fishnish Overlay 2,175 sq.m. £            50,000.00
B8073 Dervaig to Calgary Overlay 4,350 sq.m. £          100,000.00
B8073 Tobermory to Dervaig pre SD  2026 Overlay 2,610 sq.m. £            60,000.00
B8035 Gleann Seilisteir South Overlay 3,910 sq.m. £            90,000.00
B8035 Gleann Seilisteir BT Station Overlay 1,300 sq.m. £            30,000.00
A848 Ardmore Old Depot Overlay 1,300 sq.m. £            30,000.00
U6 Croig Road Overlay 1,520 sq.m. £            35,000.00
Tobermory Patching  ( budget fit) - inlay Inlay 5,435 sq.m. £          122,000.00
U20 Bunessan - inlay Inlay 1,300 sq.m. £            30,000.00
Surface Dressing A848  Tobermory 30mph  - Gullan Dubh     -   Laying  Surface Treat 35,000 sq.m. 210,000.00£          
Drainage CULVERT Enlargement and Headwall improvements Pipework 63 lin.m. 31,500.00£            
upgrade DITCH  Reprofiling  (including Verge clearanace) Excavation 1,260 lin.m. 31,500.00£            
District total estimate 1,260,000.00£       
Page 13

Page 14

APPENDIX - 2c
CARRIAGEWAY TREATMENT BUDGET  - 2025-26 BUTE AND COWAL
8,000,000£           Network allocation
34,900 sq.m. Surfacing
B&C = 20% 1,600,000£           Area Budget share of  £8M 66,670 sq.m. Surface Dressing
split  70/30
Cowal 1,120,000£           district allocation of £8M budget Treatment Quantity Unit Estimated Value
70% Carriageway A8003  Royal Brae - Tighnabruaich Inlay 1800 sq.m. £           63,000.00
Bituminous C57 Glenbranter - North Scheme Overlay 2800 sq.m. £           84,000.00
Surfacing U22 West Glendaruel (Camquhart  /  Bridge>A886) Overlay 2000 sq.m. £           60,000.00
Inlay & overlay B8000 Multiple Sites   short overlays Inlay 1000 sq.m. 35,000.00£           
B866 Shore Road Colintraive Overlay 3800 sq.m. 98,000.00£           
A815 - St Catherines 40mph Overlay 1160 sq.m. 45,130.00£           
A815 Sandbank - Rankins Brae (budget fit) Inlay 3200 sq.m. 88,000.00£           
A815 Sandbank - Fir Brae to Lazaretto Ferry Road Inlay 600 sq.m. 23,400.00£           
A885 Argyll St - Stadium to Bencorrum Brae Inlay 1350 sq.m. 38,000.00£           
B828 - A83 to B839 Overlay 430 sq.m. 16,770.00£           
B839 - A815 to Drimsyniebeag Bridge Overlay 800 sq.m. 31,200.00£           
C7 Kames Middle Road Inlay 1000 sq.m. 35,000.00£           
C9 Larach - Blairmore to Whistlefield Overlay 1200 sq.m. 46,800.00£           
C60 Cammesreinach Brae Inlay 1350 sq.m. 44,950.00£           
U17 Cowal Place - McArthur St to Cowal Ave Inlay 1300 sq.m. 45,500.00£           
Pre SD Patching U19 Couston    ( PSD  2026  - future years)  Patching 750 sq.m. 29,250.00£           
Surface Dressing A815 Bullwood Rd - Ardhallow Gate Lodge to Kilbride Rd Surface Treat 9,000 sq.m. 54,000.00£           
laying B836 Clachaig west of 30mph  to Tarsan Dam Surface Treat 19,000 sq.m. 114,000.00£          
U22 Glendaruel bridge to Achanelid Farm Surface Treat 18,670 sq.m. 112,000.00£          
Drainage CULVERT Enlargement and Headwall improvements Pipework 56 lin.m. 28,000.00£           
upgrade DITCH  Reprofiling  (including Verge clearanace) Excavation 1,120 lin.m. 28,000.00£           
District total estimate 1,120,000.00£       
Bute 480,000£              district allocation of £8M budget Treatment Quantity Unit Estimated Value
30% Carriageway UC5 Glecknabae -  Lenie hall - Pipers Cave  Overlay 1,900 sq.m.  £                45,600.00 
Bituminous A844 Kerrycroy Overlay 2,800 sq.m. 90,300.00£           
Surfacing C3 Lubas Farm Patching 500 sq.m. 19,500.00£           
Inlay & overlay U32 Foley Road Inlay 1,000 sq.m. 35,000.00£           
U45 Longhill Terrace Inlay 860 sq.m. 30,100.00£           
U41 King St, U50 Mill St & U62 Stuart St Inlay 2,200 sq.m. 77,000.00£           
U64 Union St - North Leg Inlay 1,100 sq.m. 38,500.00£           
Surface Dressing A844 Ettrick Bay - Schoolhouse to Cranslagvourity Farm Surface Treat 20,000 sq.m. 120,000.00£          
Drainage CULVERT Enlargement and Headwall improvements 24 lin.m. 12,000.00£           
upgrade DITCH  Reprofiling  (including Verge clearanace) 480 lin.m. 12,000.00£           
District total estimate 480,000.00£          
Page 14

Page 15

Appendix  -2d
CARRIAGEWAY TREATMENT BUDGET  - 2025-26 HELENSBURGH & LOMOND
8,000,000£             Network allocation
32,546 sq.m. Surfacing
HL= 14% 1,120,000£             Area Budget share of  £8M 46,500 sq.m. Surface Dressing
1 District only
H & L = 100% 1,120,000£             district allocation of £8M budget Treatment Quantity Unit Estimated Value
Lomond Carriageway A814 Cardross Lyleston West Lodge Overlay 1,950 sq.m. £           43,000.00
Bituminous A814 Rhu Lagarie House Overlay 1,360 sq.m. £           30,000.00
Surfacing A818 Luss Road Blackhill Overlay 2,275 sq.m. £           50,000.00
Inlay & overlay B833 Shore Road Cove Kirklea Overlay 2,725 sq.m. £           60,000.00
U262 Shore Road Shandon PH2 Overlay 4,545 sq.m. £         100,000.00
U324 Woodlea Crescent Garelochead Inlay 1,365 sq.m. £           30,000.00
U97 East Abercromby st (Railway bridge) Helensburgh Inlay 500 sq.m. £           11,000.00
U242 Reay Avenue (Junction with A814) Cardross Inlay 410 sq.m. £             9,000.00
U103 East Montrose Street Helensburgh Patching 1,416 sq.m. 63,500.00£           
C75 Rhu Road Higher Helensburgh Patching 700 sq.m. 31,500.00£           
A814 Main Road (A814) through Cardross Machine patch 5,000 sq.m. 90,000.00£           
U144 Hardy Hill (no.65 to JCT Winston Rd Helensburgh Inlay 1,100 sq.m. 27,500.00£           
B838 Church road Arrochar Overlay 800 sq.m. 20,000.00£           
U57 Charlotte street Bridge Helensburgh Inlay 500 sq.m. 25,000.00£           
U002 Abrecomny Crescent Helensburgh Inlay 3,300 sq.m. 82,500.00£           
B833 Shore Road Kilcreggan @ pedstrian crossing inlay 1,000 sq.m. 25,000.00£           
U299 Upper Glenfinlas street Helensburgh Machine patch 1,300 sq.m. 28,500.00£           
U270 St Modans Way Rosneath Inlay 600 sq.m. 15,000.00£           
U159 Jellicoe Place Helensburgh Inlay 1,300 sq.m. 32,500.00£           
Pre S D Patching A814 Garelochhead bypass, North Glen Douglas Patching 400 sq.m. 10,000.00£           
Surface Dressing A814  Glen Douglas northwards to A83 junction Surface Treat 32,000 sq.m. 193,000.00£         
laying A814, Haul road - Whistlefield roundabouts Surface Treat 14,500 sq.m. 87,000.00£           
Drainage CULVERT Enlargement and Headwall improvements Pipework 56 lin.m. 28,000.00£           
upgrade DITCH  Reprofiling  (including Verge clearanace) Excavation 1,120 lin.m. 28,000.00£           
District total estimate 1,120,000.00£      
Page 15

Page 16

This page is intentionally left blank