Appendix 2 Photo Record 2024
Argyll and Bute Council · 20 March 2025
Back to Environment, Development and Infrastructure Committee — 20 March 2025 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
ANNUAL STATUS AND OPTIONS REPORT 2024-25 Appendix 2 PHOTOGRAPHIC RECORDS OF CONSTRUCTION PROJECTS. Kintyre - B8001 Auchmeanach Farm – slope stabilisation Existing unstable slope, subject to frequent movement. Initial excavation and removal of unsuitable.
Page 2
Mid-Argyll - A819 Electric Cottage - Widening Ph 3 and Ph 4 PH3 April – June 2024 Reduction in vertical alignment and widening to 2 lanes 6.5 m minimum PH4 October – November 2024
Page 3
Construction of widened carriageway section and filter drainage, linked to existing culverts Widened North Bound lane and drainage Enhanced Southbound embankment
Page 4
Lorn - A816 Blaran Widening PH 4 August 2024 Embankment widening, carriageway construction and culvert extensions
Page 5
Islands - road surfacing improvements 2024 Isle of Coll Isle of Colonsay Isle of Bute A844 Stewarthall – Milton UC 1 Bogany - Asgog
Page 6
Street Lighting – System upgrades to mitigate recurring faults. Nant Drive – Oban, Street Lighting duct, cable and column replacement. Footways - Transport Scotland additional funding.- (Safety Improvements Project) Cruachan Cottages – Taynuilt - Linking footpath, verge improvement – T.S. Safety fund Millpark Road – Oban – Linking footpaths and on-street parking improvements T.S. Safety fund.
Page 7
Gibraltar Street – Oban - Public Realm - Scottish Gov additional finding. Ph 1- 2023 Street Lighting and Surface improvements, Ph 2 - 2024 Street Furniture installation
Page 8
CAMPELTOWN FLOOD ALEVIATION SCHEME – PHASE 4 2023-24 - MILLKNOWE Phase 4 – Millknowe The field that sits between Hillside Road and Snipefield Industrial Estate will be surrounded by a wall and turned into a storage reservoir which can safely flood during weather events and hold water. The water will then be safely and slowly discharged through a new system. I