Argyll and Bute Council · 16 September 2025
Back to Planning, Protective Services and Licensing Committee — 16 September 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING
COMMITTEE held BY MICROSOFT TEAMS on WEDNESDAY, 20 AUGUST 2025 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Gordon Blair
Councillor Jan Brown
Councillor Audrey Forrest
Councillor Amanda Hampsey 
Councillor Graham Hardie
Councillor Fiona Howard
Councillor Mark Irvine
Councillor Andrew Kain
Councillor Peter Wallace 
Attending: Stuart McLean, Committee Manager
Sandra Davies, Major Applications Team Leader
Kirsty Sweeney, Area Team Leader
Ronnie Hogg, Planning Officer 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Daniel Hampsey, Paul Kennedy,
Liz McCabe and Dougie Philand. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. MINUTE 
The Minute of the Planning, Protective Services and Licensing Committee held on 18
June 2025 was approved as a correct record. 
4. MR LORNE MARSHALL: CHANGE OF USE OF LAND TO FORM TIMBER
STORAGE AND FIREWOOD PROCESSING AREA (PART
RETROSPECTIVE): NA TRI GLEANN, SANDBANK, DUNOON (REF:
24/01882/PP) 
The Planning Officer spoke to the terms of the report.  This retrospective application was
made following planning enforcement action and seeks to regularise the change of use of
land (previously used as a horse arena) for the storage of timber and processing of
firewood.  The site is located within the ‘countryside zone’ as designated by the Local
Development Plan. 
The proposal has been the subject to 27 representations comprising 14 objections,
including one from a local Member, one neutral comment, and 12 supporting comments. 
Concern has been raised regarding a variety of matters including impacts on residential
amenity, road safety, public access, landscape and visual amenity, and biodiversity.  No
objections have been received from statutory or non-statutory consultees. 
Notwithstanding the concerns raised by third parties, the proposal is considered to be
consistent with the relevant provisions of the Development Plan (NPF4 and LDP2) and
there are no other material considerations identified to indicate that planning permission
should be withheld.

Page 2

It was recommended that planning permission be granted subject to the conditions and
reasons appended to the report of handling. 
Decision 
The Committee agreed to grant planning permission subject to the following conditions
and reasons: 
Standard Time Limit Condition (as defined by Regulation)
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 15.10.2024; supporting information and, the approved drawings listed in
the table below unless the prior written approval of the planning authority is obtained for an
amendment to the approved details under Section 64 of the Town and Country Planning
(Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan *1 of 3 - 05.11.2024
Site Plan *2 of 3 - 20.05.2025
Timber Building
Floor Plan &
Elevations
*3 of 3 - 23.10.2024 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. Operations: Notwithstanding the provisions of Condition 1, the development hereby permitted,
including the log splitting and chainsaw use, shall be restricted to the specified operational
hours of 08:00 to 18:00 Mondays to Fridays (excluding site transportation – see Condition 3);
on any day excepting Saturdays, Sundays and Bank Holidays when the use shall not be
permitted at all. 
Reason: In order to protect the amenity of the area. 
3. Operations: Site Transportation (delivery and distribution of wood) associated with the hereby
approved development shall only be undertaken during the hours 08:00 to 18:00 Mondays to
Fridays and 08.00 to 13.00 on Saturdays. There will be no Site Transportation on Sundays and
Bank Holidays. 
Reason:  In order to protect the amenities of the area from noise. 
4. Operations: Chainsaw activity associated with the hereby approved development will take
place behind ‘Herras Fencing’ deployed in a ‘V’ shape with 20db acoustic wading attached to
mitigate any possible noise pollution. Chainsaw activity will be restricted to 60 minutes per
working week and shall only take place within the specified operational hours of 08:00 to 18:00
Mondays to Fridays. The applicant will keep a logbook of such instances which will be
available to the Planning Authority for inspection upon request. 
Reason:  In order to protect the amenities of the area from noise.

Page 3

5. Operations: Prior to any operations re-commencing relating to this proposed development,
2m high solid entrance gates with 20db acoustic wading attached shall be installed. The gates
will open inwards. The gates will remain closed when plant and machinery is in operation
including the off-loading and loading of timber from or to vehicles. 
Reason:  In order to protect the amenities of the area from noise by mitigating any possible
noise pollution and to preserve visual amenity. 
6. Storage: External storage associated with the hereby approved development shall only take
place on land designated for such a purpose. 
• Log piles of timber to be processed will not exceed 3m in height.
• Stacks of bagged processed timber will not exceed 3m in height.  
Reason: In order to protect the visual amenity of the locale. 
7. Lighting: No external illumination of the building or land within the application site shall be
permitted without the prior written consent of the Planning Authority. Any request for the
approval of details pursuant to this condition should include the number, location, height and
intensity of the proposed lighting units, which shall be positioned such as to avoid light spillage
beyond the area intended to be illuminated.   
Reason: In order to protect the amenity of the locale. 
8. Visibility Splays: Prior to the operations or deliveries commencing for the hereby approved
development, the junction of the existing access with the public road shall have visibility splays
of 2.4 metres to point X by 136 metres to point Y from the centre line of the existing access. 
The visibility splays shall be maintained thereafter clear of all obstructions such that nothing
shall disrupt visibility from a point 1.05 metres above the access at point X to a point 0.6
metres above the public road carriageway at point Y.   
Reason:  In the interests of road safety. 
9. Landscaping / Biodiversity Enhancement: No development (including any tree felling/works
or land engineering works or any associated operations) shall commence until a scheme of
boundary treatment, surface treatment and landscaping has been submitted to and approved
by the Planning Authority. The scheme shall include details of: 
i) Location, design and materials of proposed walls, fences and gates; 
ii) Surface treatment of proposed means of access and hardstanding areas; 
iii) Any proposed re-contouring of the site by means of existing and proposed ground
levels; 
iv) Location of proposed soft landscape works including tree and shrub species and
sizes; 
v) Details of any existing trees / hedge to be removed; 
vi) Details of the location and canopy spread of existing trees / hedge to be retained as
part of the development including a programme of measures for the protection of
trees /hedge during construction and operation of the firewood processing and
timber storage business which shall include fencing at least one metre beyond the
canopy spread of each tree in accordance with BS 5837:2012 “Trees in Relation to
Construction and Development”; and

Page 4

vii) A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits will
be maintained for the lifetime of the development. 
The development shall not be occupied until such time as the physical biodiversity
enhancement measures (bird nesting boxes, ‘swift bricks’, wildlife ponds, bat and insect boxes,
hedgehog homes etc), the boundary treatment, surface treatment and any re-contouring works
have been completed in accordance with the duly approved scheme. 
All biodiversity enhancement measures consisting of new or enhanced planting shall be
undertaken either in accordance with the approved scheme of implementation or within the
next available planting season following the development first being brought into use. 
All of the hard and soft landscaping works shall be carried out in accordance with the approved
scheme during the first planting season following the commencement of the development,
unless otherwise agreed in writing by the Planning Authority. 
The biodiversity statement should refer to Developing with Nature guidance | NatureScot as
appropriate. 
Reason: To assist with the integration of the proposal with its surroundings in the interest of
amenity. 
10. Sustainable Drainage System: Notwithstanding the effect of Condition 1, the development
shall incorporate a surface water drainage system which is consistent with the principles of
Sustainable urban Drainage Systems (SuDS) compliant with the guidance set out in CIRIA’s
SuDS Manual C753 and Sewers for Scotland 4th Edition. The requisite surface water drainage
shall be operational prior to the development being brought into use and shall be maintained
as such thereafter. The post-development run-off rate should not exceed the pre-development
run-off rate at the site. 
Reason: To ensure the provision of an adequate surface water drainage system and to prevent
flooding. 
Note to Applicant: 
Further advice on SuDS can be found in SEPA’s Standing Advice – www.sepa.org.uk 
11. Waste Management: The development hereby approved shall not be brought into use until
the on-site waste/recyclable storage areas have been provided and are secured for the life the
development other than in the event of any revision thereof being approved in writing by the
Planning Authority. 
Reason: In order to accord with the principles of sustainable waste management within Policy
12 of NPF4. 
(Reference: Report by Head of Development and Economic Growth dated 6 August 2025,
submitted) 
5. GB WIND FARM LIMITED: ERECTION OF A 120 METRE HIGH
METEOROLOGICAL MAST FOR A TEMPORARY PERIOD OF UP TO 4
YEARS: LAND APPROXIMATELY 2.1 KM NORTHWEST OF DUNOON AND
1.5KM SOUTHWEST OF SANDBANK (REF: 24/01926/PP) 
The Planning Officer spoke to the terms of the report and to supplementary report number
1.  The proposal is for the erection of a 120m meteorological mast to be sited for a

Page 5

temporary period of up to 4 years to gather data in relation to the viability or not of a
potential wind farm. 
105 objections have been received in respect of this proposal, including one from a local
Member.  One person submitted a representation in support of this proposal.  Matters
raised relate to temporary consents, visual impact, lighting of masts, impact on residents,
construction of access road, peat, and inaccurate information.  A late objection has also
been received from Kilmun Community Council.  No objections have been received from
the other statutory and non-statutory consultees. 
The proposal is considered to be consistent with the relevant provisions of the
Development Plan, and there are no other material considerations of sufficient
significance to indicate that it would be appropriate to withhold planning permission having
regard to Section 25 of the Act. 
It was recommended that planning permission be approved subject to the planning
conditions recommended within the report of handling. 
For the avoidance of doubt the granting of temporary permission for the erection of this
wind monitoring mast would not in any manner imply that the site was considered suitable
for a wind farm. 
Motion 
To hold a site visit and discretionary pre-determination hearing. 
Moved by Councillor Amanda Hampsey, seconded by Councillor Jan Brown. 
Amendment 
To grant planning permission subject to the conditions and reasons detailed in the report
of handling. 
Moved by Councillor Kieron Green, seconded by Councillor Graham Hardie. 
A vote was taken by calling the roll. 
Motion   Amendment 
Councillor Brown  Councillor Armour
Councillor Hampsey  Councillor Blair
Councillor Howard  Councillor Forrest
Councillor Wallace  Councillor Green    
Councillor Hardie    
Councillor Irvine    
Councillor Kain 
The Amendment was moved by 7 votes to 4 and the Committee resolved accordingly.   
Decision 
The Committee agreed to grant planning permission subject to the following conditions
and reasons:

Page 6

Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 22.10.2024; supporting information and, the approved drawings listed in
the table below unless the prior written approval of the planning authority is obtained for an
amendment to the approved details under Section 64 of the Town and Country Planning
(Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location plan *1 of 5  23.10.2024
Site Plan *2 of 5  23.10.2024
Access Route Plan *3 of 5  24.10.2024
Outline
Arrangement of
Met Mast
*4 of 5  24.10.2024
Peat Depth Figure *5 of 5  31.04.2025 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. Duration Restriction 
The permission shall be for a period of 48 months from the commencement of the
development, the date of which shall be notified in writing to the Planning Authority. Within
three months of the end of the 48 month period, unless a further planning application is
submitted and approved, the meteorological mast and associated equipment shall be
dismantled and removed from the site and the land reinstated to the satisfaction of the
Planning Authority. 
Reason: To define the permission and in order to protect the amenity of the locale. 
3. Construction Details 
The wind monitoring mast shall not be erected until full details of ground anchors including
mast base, foundations and any fencing to protect both livestock and mast and full
reinstatement details and safety and operating maintenance details, have been submitted to
and approved by the Planning Authority in consultation with Scottish Natural Heritage. 
Reason: To allow the Planning Authority to consider these aspects in detail and in the interest
of site restoration. 
4. Bird Flight Diverters 
Notwithstanding the provisions of Condition 1 above, bird flight diverters (BFDs) with stops or
clamps shall be fitted to all guy wires at even intervals of 5 metres from the ground upwards.

Page 7

The mast thereafter shall be monitored and maintained annually for its lifetime to ensure
diverters remain in place and as necessary, missing diverters be replaced. 
Reason: In the interests of natural heritage, in order to reduce the potential for avian
casualties. 
5. Aviation Lighting 
Prior to commencing construction of any meteorological masts, or deploying any construction
equipment or temporal structure 50 metres or more in height (above ground level) the
undertaker must submit an aviation lighting scheme for the approval of Argyll and Bute Council
in conjunction with the Ministry of Defence defining how the development will be lit throughout
its life to maintain civil and military aviation safety requirements as determined necessary for
aviation safety by the Ministry of Defence. 
This should set out: 
a) details of any construction equipment and temporal structures with a total height of 50
metres or greater (above ground level) that will be deployed during the construction of the
meteorological mast and details of any aviation warning lighting that they will be fitted with;
and 
b) the location and height of the meteorological mast identifying the position of the lights on
the mast; the type(s) of lights that will be fitted and the performance specification(s) of the
lighting type(s) to be used. 
Thereafter, the undertaker must exhibit such lights as detailed in the approved aviation lighting
scheme. The lighting installed will remain operational for the lifetime of the development. 
Reason: To maintain aviation safety.  
6. Aviation Charting and Safety Management 
The undertaker must notify the Ministry of Defence, at least 14 days prior to the
commencement of the works, in writing of the following information: 
a) the date of the commencement of the erection of meteorological masts; 
b) the maximum height of any construction equipment to be used in the erection of the
meteorological masts; 
c) the date any meteorological masts are brought into use; 
d) the latitude and longitude and maximum heights of any anemometer mast(s). 
The Ministry of Defence must be notified of any changes to the information supplied in
accordance with these requirements and of the completion of the construction of the
development. 
Reason: To maintain aviation safety. 
(Reference: Report by Head of Development and Economic Growth dated 
6 August 2025 and supplementary report number 1 dated 15 August 2025, submitted) 
6. TREE PRESERVATION ORDER AT WEST AILEY, SHORE ROAD, COVE 
Consideration was given to a report recommending a Tree Preservation Order be
confirmed on a Chestnut tree in the garden of West Ailey, Shore Road, Cove.

Page 8

Decision 
The Committee agreed that the Tree Preservation Order be confirmed in accordance with
Section 160 of the Town and Country Planning (Scotland) Act 1997 for area marked on
plan attached to the report (Appendix 1). 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 20 August 2025, submitted) 
7. UPDATE ON SCOTTISH GOVERNMENT SECTION 36 CONSULTATIONS 
A report providing an update on responses sent to the Scottish Government’s Energy
Consents Unit on Section 36 Consultations in respect of Killearn Wind Farm and
Balliemeanoch Pump Storage Hydro was before the Committee for information. 
Decision 
The Committee noted: 
1. the submission of these two holding objections to the Energy Consents Unit to
safeguard the Council’s position; and 
2. that Officers would present a report to PPSL at a future date on each of these S36
applications for their views, as and when it was competent to do so. 
(Reference: Report by Head of Development and Economic Growth dated 6 August 2025,
submitted) 
8. UPDATE ON RECENT SCOTTISH GOVERNMENT PLANNING APPEAL
DECISIONS 
A report summarising recent decisions by Scottish Ministers following appeals in respect
of High Hedge application reference 24/01562/HH at High Road, Port Bannatyne, Isle of
Bute, and Enforcement Notice served in relation to a garden fence at Flat 2, 3 Shore
Road, Port Bannatyne, Isle of Bute, was before the Committee for information. 
Decision 
The Committee noted the content of the report. 
(Reference: Report by Head of Development and Economic Growth dated 20 August
2025, submitted) 
The Committee resolved in terms of Section 50(A)(4) of the Local Government (Scotland)
Act 1973 to exclude the press and public for the following item of business on the grounds
that it was likely to involve the disclosure of exempt information as defined in Paragraph
13 respectively of Part 1 of Schedule 7A to the Local Government (Scotland) Act 1973. 
9. PROPOSED TREE PRESERVATION ORDER 
The Committee gave consideration to a request for a Tree Preservation Order.

Page 9

Decision 
The Committee agreed to the recommendations detailed in the report. 
(Reference: Report by Head of Development and Economic Growth dated 20 August
2025, submitted)