Page 1

ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT
AND INFRASTRUCTURE
COMMITTEE 
DEVELOPMENT & ECONOMIC
GROWTH
20 MARCH 2025 
UNMANNED AERIAL VEHICLE (UAV) TRIALS 
1.0  EXECUTIVE SUMMARY 
1.1  Argyll and Bute Council have collaborated with Skyports, a private company,
to examine and establish a large volume of Unmanned Aerial Vehicle (UAV)
(drone) trials over the west coast of Scotland.  The duration of the project was
a year and was completed in September 2024.  Funding for this project was
secured through the UK Govt’s. Regulator Pioneer Fund and received £250k. 
1.2  During the project, the local authority and Skyports investigated the feasibility
of the creation of a blanket area of low-density airspace over rural areas that
would enable the safe integration of unmanned aircraft systems with general
aviation/scheduled manned aircraft.  This required close working with the Civil
Aviation Authority to look at groundbreaking new regulations and discussions
are still on going. 
The successful trials and regulatory change will: 
• Validate that low-density airspace over rural areas is a viable means of
safely, seamlessly and equitably integrating unmanned with manned
aviation. 
• Provide a blueprint that can be applied anywhere in the UK with the same
air and ground risk characteristics.
• Support the achievement of recurring UAV operations in the UK - not
currently achievable inside temporary segregated airspace corridor
structures. 
• Complete a foundational step towards unlocking UAV airspace in the UK
without disenfranchising manned aviation.
• Provide a network across the West Coast of Scotland, including inter
island, to allow UAV trials for multi logistic delivery purposes. 
2.0  RECOMMENDATIONS 
2.1  It is recommended that the Environment, Development and Infrastructure
Committee:- 
i. Consider the report included in Appendix A.

Page 2

ii. Approve course of action to now publish the report, including Comms
communications press release with quotes from participants. 
3.0    DETAIL 
3.1  In November 2022, the UK Government awarded Argyll and Bute Council a
grant of £250,000 via the Regulators’ Pioneer Fund (RPF) to deliver West
Coast of Scotland Trial for Integration of Manned and Unmanned Air Space,
which finished in August 2024. The RPF is a grant-based fund to enable UK
regulators and local authorities to help create a UK regulatory environment
that  encourages business innovation and investment. The current £12m
round is being delivered by the UK Govt Department for Science Innovation
and Technology. 
3.2  The council appointed the services of Skyports Drone Services to assess the
feasibility of establishing a volume of airspace over the west coast of Scotland
whilst conducting a series of Uncrewed Aerial Systems (UAS) demonstrations
within the region. 
3.3  The project was split into three phases, covering the following items: 
i. Regulatory Pioneering 
ii. Delivery Operations 
iii. Survey Demonstration 
3.4  The project aimed to assess the feasibility of integrating Uncrewed Aerial
Systems with general aviation within the west coast of Scotland. The primary
objective was to carry out a series of flight demonstrations and inspections to
explore how drone services can benefit remote communities and businesses
in the area. 
3.5  The trials were split into two main categories of logistics/transfer of goods 
and survey and surveillance. 
Logistics/transfer of goods Trials 
3.6  Argyll and Bute Council has now undertaken trials for school meal deliveries, 
worked with Regulatory Services in trials for food and water samples, worked 
with external agencies Royal Mail and NHS in deliveries of mail and hospital 
drugs/equipment. This was undertaken between Islay and Jura. 
Survey and Surveillance Trials 
3.7  The Council Roads and Infrastructure Service undertook trials for use in (survey 
and surveillance) vegetation management along the River Ba on Mull. Scottish 
and Southern Electric Networks undertook trials for a transmission powerline 
from Dunoon to Arrochar and Network Rail undertook UAV surveillance trials 
of railway inspections between Taynuilt and Dalmally.

Page 3

3.8  By establishing the benefits drones bring to Argyll & Bute, this contributes to
the feasibility of establishing a permanent drone base such as the Advanced
Air Mobility Hub at Oban Airport, that has been allocated £4M through the
Rural Growth Deal programme subject to a successful business case being
approved. 
Images below of the Trials and Outputs:-

Page 4

No embedded text on this page.

Page 5

3.9  A critical aspect of the report involves outlining the benefits and impacts drone 
services can bring to remote island communities and seeing how regulations 
can help enhance the expansion of drone networks within these regions. 
3.10  The study also defined other potential use cases that the council could be 
interested in exploring that would have an impact in providing efficiency, 
enhanced safety, and reduced cost within council services. 
4.0 CONCLUSIONS 
4.1 Based on the project conducted, the following can be concluded: 
4.2  There is a strong use case for drone-enabled deliveries which would provide a
significant timesaving for end users. Increased payload weight and further
distances are keen to be explored to establish the feasibility of expanded
operations. Temperature control is a key component for a handful of end
users; this would need to be further explored prior to integrating with day-to-
day operations.  
4.3  Survey Demonstrations: Drone-enabled inspections provide a significant
health and safety benefit together with time savings brought about by the
remote nature of drone operations. Council services would benefit the most
for inspection use cases mainly for council owned infrastructure. 
4.4  Regulatory Innovation: The regulatory landscape is continuously changing,
and it is necessary for regulatory bodies, airspace users, and operators to
collaboratively work together to work toward demonstrating the safe
integration and operation of drones within the United Kingdom.   
5.0  IMPLICATIONS 
5.1 Policy - the Single Outcome Agreement (SOA) and Economic Development
Strategy and Action Plan support improvements to reduce the carbon
footprint.
5.2 Financial – None – external UK funding supported this project.
5.3  Legal – Tenders for consultancy work need to be compliant with regulations.
5.4  HR- None directly from this report. 
5.5  Fairer Scotland Duty:
5.5.1   Equalities - protected characteristics - the differing nature of the deployment
of new technology UAV has the potential to lead to inequalities in terms of
access to services including those which support business. 
5.5.2   Socio-economic Duty - there is an overall risk that the economic and social
benefits rising from modern UAV technology are not fully realised.
5.5.3 Islands - There are risks that those areas which do not benefit from UAV
technology and services could become less attractive locations within which
to live and work which could have implications in relation to the SOA objective
of growing the population.

Page 6

5.6 Climate Change - The ability to access UAV services will limit the
requirements to travel logistics, reducing the carbon footprint with Argyll and
Bute. 
5.7 Risk - The various UAV programmes are reliant on new technology and
innovation which is developing rapidly. Some projects are reliant on
commercial operator decisions to invest whilst grant funding is necessary for
many aspects. These aspects all create a level of uncertainty around the
extent of UAV infrastructure improvements.
5.8  Customer Service - improvements in UAV technology improve the
opportunities for the efficient delivery of customer services.
5.9 The Rights of the Child (UNCRC) – None. 
Kirsty Flanagan, Executive Director with responsibility for Development and
Economic Growth 
Councillor John Armour, Policy Lead for Roads, Transport and Amenity 
Services 
March 2025 
For further information contact: 
Fergus Murray, Head of Development and Economic Growth 
fergus.murray@argyll-bute.gov.uk 
Moya Ingram, Strategic Transport Manager
moya.ingram@argyll-bute.gov.uk 
APPENDICES 
Appendix A – Skyports RPF Report 20241211.pdf