REVIEW OF RIS Appendix 1

Argyll and Bute Council · 19 June 2025
Back to Environment, Development and Infrastructure Committee — 19 June 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Classification: OFFICIAL#
Priority
Improvement
Action Rationale and Detail Progress Current Position
Organisational
Reshape:  Develop
and implement a
revised
organisation
structure for RIS.
This action will deliver Stage 3 of the RIS Review process and is fundamental
to enabling the success of all other improvement related activities and will
form the foundations for a refreshed Roads and Infrastructure Service. The
existing organisation structure does not provide optimal levels of clarity and
accountability and in some areas appears to lack the capacity required to
effectively respond to near term challenges. The need for change to the
management structure is not universal with some teams requiring only
limited change.
In Progress This action is taking place in 2 phases.  The first
phase relates to the third-tier management
structure.  Formal engagement has taken place with
Trade Unions and affected staff and following
detailed and considered feedback from Third Tier
Managers on the new structure, work is ongoing to
review proposals in light of this feedback.
Phase 2 relates to tier 4 and below.  Further
information will be provided in this regard once the
review of proposals, as a result of the feedback from
Third Tier Managers, has been concluded.
Waste Post PPP
Arrangements: 
Drive forward the
selection and
development, by
the Council, of the
organisational
arrangements to
come into place for
waste disposal at
the end of the
current PPP
contract.
With the current PPP contract expiring in September 2026, a key area of
focus is to increase the pace at which the organisational arrangements that
will be required after the end of the contract are developed and put into
operation. In the short-term additional capacity is being added to the
Council’s existing waste team through external specialist consultancies. As
the future arrangements become clearer the capacity of the Council’s waste
team will be further reviewed.
In Progress External consultants continue to progress Options
Appraisal for future organisational arrangements.  A
number of existing commercial and contractual
matters in relation to the PPP contract are being
progressed along with matters that relate to the
impact on Municipal Bio-degradable Waste to
Landfill. 
Organisational Design and People
Roads and Infrastructure Service Review - Priority Workstreams
Appendix 1

Page 2

Classification: OFFICIAL#
Infrastructure
Capital
Programme
Management: 
Improve
consistency of
approach to
project
management.
While there is a strong emphasis on managing the design and construction
phases of projects the process of business case development and
assurance within RIS can be improved and strengthened and brought into
better alignment with the Council wide approach of the Project Pipeline and
adoption of best practice through the Treasury Green Book business case
approach.
In Progress Work is progressing well to align RIS projects with
the Council’s Project Pipeline.  The RIS Management
Team are working with the Corporate Programme Co-
ordinator to conclude this action. 
Respond to
Reduced Roads
Asset
Maintenance
Budget:  Review
the impact of the
reduction in roads
maintenance
capital budget on
the overall staffug
structure - with
particular
emphasis on the
impact o front-line
operational staffing
(due to existing
approach to capital
recharging of a
proportion of
operative staff
time).
This action was initially developed in response to the anticipated significant
reduction in the level of capital funding for 2025/26. The decision at Council
to award a capital budget of £10m for roads reconstruction in 2025/26 has
reduced the urgency of this action. However with ongoing pressure to
Council budgets and no guarantee that the current level of capital funding
can be maintained in future years, it remains necessary for the service to
review how a potential future reduction in the capital budget would impact
on the current operating model and balance between activities delivered by
in-house resource and those delivered by contractors.
Timeframe to
be aligned
with timetable
for wider
Council
Savings and
Budgets
options
process
An initial high-level review has been undertaken
outlining the types of both capital and revenue works
that would be prioritised under different funding
scenarios – this work will be further progressed over
the coming year.

Page 3

Classification: OFFICIAL#
Helensburgh
Waste Transfer
Station (WTS)
Project to be
subject to project
gateway review to
re-baseline the
benefits in the
context of whether
it can offer
opportunities to
increase efficiency
in waste collection
and resilience in
waste disposal of
sufficient
magnitude to
justify the required
capital investment.
The proposed Helensburgh WTS is no longer required to ensure the Council
has a bio-ban compliant disposal solution in this area. The project does
however offer benefits in terms of resilience of waste disposal by enabling
the Council to bulk waste and therefore being at less risk if it has to take
waste further than at present for disposal. Construction of the WTS may also
enable revised and lower cost shift patterns to be adopted by the waste
collection teams. However it is not clear that these efficiency and resilience
gains are sufficient to justify £3.6m of capital investment.
Complete Following agreement of the Environment,
Development and Infrastruture Committee on 20th
March 2025 that officers should not progress further
with the development and delivery of the
Helensburgh WTS and the subsequent agreement of
the Policy & Resources Committee on 8th May 2025
that the remainder of the £3m of budget earmarked
for this project could be retained for other funding
related pressures within the Waste Service, this
Priority Improvement Action has now been
concluded.

Page 4

Priority
Improvement
Action Rationale and Detail Progress Current Position
RIAMS
Improvement: 
Establish cross
service project
team with
involvement from
corporate, digital
and finance to
fundamentally
review WDM and
Total systems to
determine and
drive forward a
plan to either re-
configure ir replace
both (recognising
existing Total
product must be
replaced due to
product soon to
become
unsupported).
Stage 1 and 2 of the review process identified that the core asset and information
management system used by the service in relation to roads, amenities and
environmental assets is not optimally configured and is not offering the maximum
value possible.  This system also interacts with a service specific finance system
which is coming to its end of life and with the corporate customer relationship
management system. This Priority Improvement Action will see these systems
reviewed with targeted improvements made to maximise benefit and ensure a
replacement for the finance element is in place prior to the expiry of the existing
product.
This work will include reviewing the opportunities for artificial intelligence to add
greater value and enable staff to spend a greater proportion of their time on higher
value-added activities.
In Progress Work in respect of the 3 key areas of
improvement (Finance module;
Environmental Land Management (ELM)
module and Customer Relationship
Management (CRM) module) has been
progressed with each project lead
having completed a project brief for their
element.  As the current Finance module
becomes unsupported in March 2026,
priority has been given to this element of
the system to ensure that a replacement
is in place prior to this date. 
Roads and Infrastructure Service Review - Priority Workstreams
Data, Digital and Customer

Page 5

Priority
Improvement
Action Rationale and Detail Progress Current Position
Commence
programme of
strategic change to
parking and
enforcement
related activity.
A strategic review of parking services and options for
change should be developed for consideration by
Members as a co-ordinated package of service changes.
TBC - Cannot
be progressed
until Reshape
has been
concluded
This action cannot be progressed until the Organisational
Reshape action has been concluded. 
Develop and
implement a
package of
changes to school
transport including
ASN transport.
This is a policy area that, nationally, has been under
significant financial strain for a number of years as a result
of increases in demand. A package of changes will be
developed including:
•	Reviewing the approach to procurement in targeted areas.
•	Strengthening co-ordination between Council services in
Education and RIS in relation to planning for the transport
requirements of children and young people with ASN.
In progress Work is taking place to progress quarterly meetings with
colleagues in Education to better understand current and
future ASN needs and  to create a formalised process that
allows for consideration of transport needs against ASN
requirements.   
Continue to
progress route
optimisation
project.
This project is fundamental to having improved customer
service and performance metrics to drive efficiency in the
waste collection service.
In progress Staff training and familiarisation with the technology has now
been concluded and the installation of the in-cab technology
is all but complete, with the only vehicle located out on Tiree
remaining to be fitted.  The first pilot area began trials in May
2025 with wider roll out expected to take place before the
end of June 2025.    This Priority Improvement Action is the
subject of another report on today's agenda.
Roads and Infrastructure Service Review - Priority Workstreams
Policy and Procedure

Page 6

Continue to
progress the
second domestic
waste bin review
and seek to reduce
residual waste
collection in line
with the volume
recommended in
the Code of
Practice for
Household
Recycling in
Scotland of 80L per
week for
households with
kerbside access
and 70L per week
for flats with a
communal service.
To reduce waste disposal volumes and increase recycling
and re-use, thereby supporting achievement of
environmental strategies and targets and reducing revenue
cost of waste disposal and waste collection services. This
work, alongside the route optimisation project will be
driven forward with increased pace to deliver
improvements in both efficiency and customer service.
In progress The consultation on the second green bin collections ended
on 15 May 2025, responses are currently being reviewed and
collated.  This Priority Improvement Action is the subject of
another report on today's agenda.

Page 7

Priority
Improvement
Action Rationale and Detail Progress Current Position
Further review the
options for
increased
commercial
activity in the fleet
maintenance
workshops.
Stage 1 of the review reached
conclusions in relation to the potential to
generate additional income through fleet
services. The Stage 2 due diligence did
not fully support the conclusion as they
did not take account of the local context
of Argyll and Bute including our highly
rural nature, topography and long
distances between vehicle operating
centres (depots). However opportunities
are believed to exist to further review
medium to long term options to increase
efficiency and / or generate additional
commercial income.
A further and more detailed review of
capacity that involves looking at both
existing capacity available for
commercial work will be progressed.
02/06/2025 Work to progress an initial productivity survey,
amongst other works to begin week commencing 2nd
June 2025.
Roads and Infrastructure Services Review - Priority Workstreams
Commercial Opportunities

Page 8

Progress the initial
review of
commercial waste
income to ensure
that all in receipt of
commercial waste
servcies are being
charged for the
service of which
they are in receipt.
A review of back office and operational
proceudres will be implemented to
provide assurance that this are of service
is operating to optimum levels.
In progress Initial work has begun on this action with the
introduction of stickers for grey commercial waste
bins.  The go live date for this project was 1st May
2025 and since then a number of new contracts have
been implemented, the team progressing this action
are still receiving a large volume of enquiries as the
process beds in.   
Further work is underway to define and implement a
process to set up commercial waste contracts for
properties who do not currently have a commercial
waste contract but are operating as self-catering
properties or small businesses. 
The financial outcome of both of these projects will
not be known until later in the year.