Page 1

Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
9 September 2025 
SUPPLEMENTARY PACK 
ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE COMMITTEE - ON A HYBRID
BASIS IN THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD AND BY MICROSOFT
TEAMS on THURSDAY, 11 SEPTEMBER 2025 at 10:30 AM 
I enclose herewith item 10 (LOCAL FLOOD RISK MANAGEMENT PLANS - S37 INTERIM
UPDATE) which was marked to follow on the Agenda for the above meeting. 
Douglas Hendry
Executive Director 
ITEM TO FOLLOW 
10. LOCAL FLOOD RISK MANAGEMENT PLANS - S37 INTERIM UPDATE (Pages 3 - 20)  
Report by Executive Director with responsibility for Roads and Infrastructure 
Environment, Development and Infrastructure Committee 
Councillor John Armour (Chair) Councillor Jan Brown
Councillor Graham Hardie Councillor Willie Hume
Councillor Andrew Kain Councillor Jim Lynch
Councillor Tommy MacPherson Councillor Ian MacQuire
Councillor Luna Martin Councillor Liz McCabe
Councillor Ross Moreland (Vice-Chair) Councillor Gary Mulvaney
Councillor Alastair Redman Councillor William Sinclair
Councillor Andrew Vennard Councillor Peter Wallace   
Contact: Julieann Small, Democratic Services Assistant - 01546 604043
Public Document Pack

Page 2

This page is intentionally left blank

Page 3

ARGYLL AND BUTE COUNCIL ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
ROADS & INFRASTRUCTURE
SERVICES 
11 September 2025 
LOCAL FLOOD RISK MANAGEMENT PLANS - S37 INTERIM UPDATE 
1.0.   EXECUTIVE SUMMARY 
This report provides an update on how the delivery of the Council's duties under
the Local Flood Risk Management Plans are progressing.  This is approximately
midway through the 2022-2028 Cycle 2 Plans. 
In accordance with the requirements of the Flood Risk Management (Scotland) Act
(2009) (‘the Act’), The Highland Council (as Lead Local Authority (LLA)) published
its second Local Flood Risk Management Plan (‘the Plan’) in December 2022,
setting out an ambitious range of flood risk management objectives and actions to
be completed in the first 6 year cycle (2022-2028).  
The Act also places a duty (under section 37) on the LLA to - review the Plan; and
- publish a report on the conclusions of the review, including information on the
progress that has been made towards implementing the measures. The interim
report must be made available for public inspection. 
The format of the Section 37 report has been developed by a Scottish Advisory
and Implementation Forum for Flooding Group, and agreed through the LLA
Forum, such that all local authorities, SEPA, Scottish Water and other responsible
authorities can input to a standard template and report in a similar format to
Scottish Government. 
The report requires noting the contents of the Section 37 Report and progress
made on the measures within the current Highland and Argyll Local Flood Risk
Management Plan; and agree to make the Section 37 Report for the Highland and
Argyll Local Plan District available to the public on the Council’s website; 
Whilst Argyll and Bute Council has identified and is working to implement schemes
identified as part of this report, it must be acknowledged that available budget and
resources play a major role in the ability to undertake these works.   
Page 3 Agenda Item 10

Page 4

ARGYLL AND BUTE COUNCIL ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
ROADS & INFRASTRUCTURE
SERVICES 
11 September 2025 
LOCAL FLOOD RISK MANAGEMENT PLANS - S37 INTERIM UPDATE 
2.0. INTRODUCTION
2.1 The Flood Risk Management (Scotland) Act 2009 (FRM Act) provides that the
Scottish Ministers, SEPA and responsible authorities (Local Authorities &
Scottish Water) must exercise their flood risk related functions with a view to
working together to reduce overall flood risk in Scotland and places certain
duties and responsibilities upon them.
2.2 SEPA are responsible for the development of Flood Risk Management Plans
(“FRMP”s) and certain Lead Local Authorities are responsible for the
development of LFRMP.
Local Flood Risk Management Plans (“LFRMPs”) are developed on a six
yearly cycle. Cycle One was from 2016-2022 and Cycle 2, currently in place,
runs from 2022 until 2028.
Argyll and Bute communities are in either:
i. The Highland and Argyll Local Plan District Area (LPD01) where The
Highland Council is the lead Local Authority.
ii. The Clyde and Loch Lomond Local Plan District Area (LPD11) where
Glasgow City Council is the lead Local Authority. 
Each Local Plan District has a FRMP and a LFRMP.
FRMPs coordinate efforts to tackle flooding in Scotland. They set the national
direction of future flood risk management, helping to target investment and
coordinate actions across public bodies. The plans explain what causes
flooding in high-risk areas as well as the impacts when flooding does occur.
Within the plans objectives for tackling flooding in high-risk areas are set
along with actions aimed at working towards those objectives.
LFRMPs include the actions recommended in the Flood Risk Management Plan
and add further details such as:
• Funding arrangements for each action
• Which organisation will be responsible for the delivery of the action.
• The timescale for delivery.
• Details of any coordination between authorities. 
Page 4

Page 5

2.3 The two current LFRMPs (Cycle Two 2022-2028) covering Argyll and Bute are:
i. Highland & Argyll Local Flood Risk Management Plan (Cycle 2)
ii. Clyde and Loch Lomond Local Flood Risk Management Plan (Cycle 2)
2.4 The Lead Authority for Argyll and Bute’s two Districts are:
i. The Highland Council for The Highland and Argyll Local Plan District
Area,
ii. Glasgow City Council for The Clyde and Loch Lomond Local Plan
District Area. 
2.5 Section 37 of the FRM Act states that each Lead Authority must prepare and
publish an Interim Report which reviews the LFRMP which has been in place for
2-3 years, and describes conclusions of the review including information on the
progress that has been made towards implementing the measures identified in
the implementation part of the plan.
2.6 To assist the two Lead Authorities with discharging their duties under the FRM
Act, Argyll and Bute Council are obliged to provide data on progress which has
been made towards implementing the measures identified for Argyll and Bute
Council in the implementation part of the two Local Flood Risk Management
Plans currently in place.
2.7 Once the final draft Interim Report is available, it is anticipated that this will
require EDI Committee approval. 
3.0. RECOMMENDATIONS
3.1 It is recommended that the Environment, Development and Infrastructure
Committee – 
i. endorse the report; 
ii. approve the content of the report and appendices to be provided to the
Lead Authorities to allow the Section 37 Interim Reports to be prepared;
and
iii. agree that the Section 37 Interim Reports are brought back to Committee
later in the year for approval. 
4.0. DETAIL 
4.1. Local Flood Risk Management Plan 2022-2028 
4.1.1. Objectives to be undertaken during Cycle 2 (2022 – 2028) for each target area
have been determined. 
4.1.2. SEPA have prioritised the Potentially Vulnerable Areas (PVAs) based on their
respective Benefit Cost Ratios (BCR). Table 3.1 has been extracted from the
Stage 1 prioritisation of flood studies submitted for FRM cycle 2 report from
SEPA:
Page 5

Page 6

Table 4.1 
Flood study title  Scheme ID  Study Location  Flood source  BCR
BCR Class
(* MB increase)
Dunoon Surface Water Management Plan -
Black Park
18 Dunoon Surface water 16.80 1 (VH)
Dunoon Surface Water Management Plan -
Sandhaven
53 Sandhaven Surface water 5.70 1 (VH)
Lochgilphead Flood Study 15 Lochgilphead, Argyll and
Bute
River and coastal 2.31 2 (H)
Oban Flood Study 13 Oban, Argyll and Bute River, coastal and
surface water
2.20 2 (H)
Kilcreggan Surface Water Management Plan -
Tigh Dearg Road
56 Kilcreggan Surface water 1.70 2 (H)
Helensburgh Coastal Flood
Protection Study
17 Helensburgh Coastal 1.33 3 (M)
Tarbert Flood Study 14 Tarbert, Argyll and
Bute
Coastal 1.17 3 (M)
Clachan Flood Study 16 Clachan Village,
Tarbert, Argyll
River 1.11 3 (M)
Page 6

Page 7

4.1.3. It can be noted that the two areas with the highest Benefit Cost Ratio are
located within the Cowal / Dunoon Areas within Argyll and Bute. 
4.1.4. A significant amount of work has been undertaken by the Council under the current
Local Flood Risk Management Plans. 
4.1.5. Works have been undertaken at a number of sites as part of Cycle 2 LFRMPs,
covered in sections 4.2-4.10 and further expanded on in Appendices A & B
which shall be submitted to the Lead Authorities subject to Committee approval. 
4.1.6. Should additional funding be made available from Scottish Government or from
other avenues, schemes are prioritised to allow progress to be made within the
remainder of Cycle 2. 
Study/ Scheme Works 
4.2. CAMPBELTOWN PVA (02/01/27)
Works have been delivered as part a £16 million pound scheme to improve the
surface water drainage in Campbeltown. The works were undertaken over an 18
month period. These works were 80% funded by the Scottish Government and
20% funded by Argyll and Bute Council. 
4.3. OBAN PVA (02/01/22)
Local Authority responsibilities:
4.3.1. All Local Authority duties for which the Council are responsible under the Flood
Risk Management (Scotland) Act 2009 have been carried out: 
4.3.1.1. Watercourse Inspection of Black Lynn Burn and its tributaries carried
out, 
4.3.1.2. No clearance and repair works have been identified which would
substantially reduce the risk of flooding of land due to the condition of
the Black Lynn or its tributaries.  Therefore, no clearance or repair
works can/shall be progressed under Section 18/59 of the Act. 
Additional works carried out to improve Oban’s resilience to flooding:
4.3.2. To improve the resilience of the Lochavullin Car Park pump system, works have
been ongoing since October 2023 and the final element of these works (the
relocation of the pump electrical units) is programme for Q3 2025/26. 
4.3.3. Hydrological study completed by in-house engineers for the Black Lynn Burn. 
The study indicates that dredging of the Black Lynn Burn would not reduce the
risk of flooding of land and that it would risk the downstream culverts being
overwhelmed.  Dredging of the Black Lynn Burn shall therefore not be
progressed. 
4.3.4. Japanese Knotweed survey undertaken and a report is expected to be available
by September 2025.  No works are anticipated to follow this report.  
Page 7

Page 8

Permanent Solution:
4.3.5. There is no identified funding for a major works solution at Oban. 
4.3.6. Any permanent Flood Protection Scheme / major works solution would be a long-
term project and likely to run into tens of millions of pounds requiring
attenuation/water storage and general climate change adaptation measures
aimed at mitigating or minimising disruption from severe weather events. 
4.3.7. SEPA’s potential revision of PVAs may affect funding prioritisation and
availability, however the outcome of their recent public consultation on this matter
for Oban is not yet known. 
4.3.8. All opportunities for securing any available funding to accelerate flood protection
works at Oban are being considered. This includes making representations to
Scottish Government seeking to make available funding to accelerate flood
protection works at Oban – including a proposal to progress a scheme separately
in smaller elements/stages, however Scottish Government still to confirm whether
this proposal would risk affecting their 80% funding. 
4.4. ISLE OF BUTE PVA (02/11/23)
Rothesay Flood Study and Flood Protection Scheme (FPS) Performance
Review
This study has been completed. This involved ground multiple on-site
investigations to be carried out such as Ground Investigations of both the areas
adjacent to the shore and the seabed. CCTV surveys were carried out to map
and gather data on the existing drainage network. Recommendations have been
provided 
4.5. HELENSBURGH TO LOCH LONG PVA (02/11/01)
Tigh Dearg Road, Kilcreggan
Works have been carried out to improve the surface water drainage system at
Tigh Dearg Road in Kilcreggan. This involved installing a 600mm surface
water drainage pipe from Argyll Road to the shore and simultaneously
installing a new 150mm sewer for which Scottish Water will adopt. The
completion certificate is expected shorty, after which a 52 week defect period
will apply. 
4.6. DUNOON PVA (02/11/22)
Dunoon Surface Water Management Plans
The schemes will be reviewed and works packages will be issued for works to
proceed should budgets allow. 
The schemes will be split into the respective areas – Black Park and
Sandhaven. 
4.7. Antrim View, Islay
Cooperation/ agreement is being sought from a landowner to reduce flood risk
to local properties, adopted road and their own business property. The Council
have undertaken Phase one of the works to increase culvert capacity in
anticipation of further works being completed by the landowner. Council’s
Page 8

Page 9

Legal department is determining appropriate responsibilities. 
4.8  Flood Monitoring Network
A Flood Monitoring Network is in place which monitors and records water
levels and rainfall at key locations across Argyll and Bute. 
Email and SMS warnings are provided to our operations teams to manage
appropriate responses during flood events or blockages. 
The existing multiyear contract to provide maintenance, telemetry and warning
services is ending and a new contract is being tendered. Multiyear contract
allowed for improved financial forecasting as annual maintenance costs are
known, however breakdown/ failure of equipment has to be managed
appropriately.
Members should note that as part of the routine work carried out by Roads and
Infrastructure Services our teams carry out inspections and clearance of trash
screens, guard and culvert entrances at known areas of potential concern.
Inspections and clearance are generally carried out prior to a known weather
event, this work is designed to maximise the capacity and capability of various
waterways and reduce flood risk. 
4.9. WDM – Web Based Flood Risk Management System (WebFRMS)
A cloud-based Flood Risk Management System, WDM WebFRMS, has been
recently implemented. WDM also provide the asset management system for the
road network, bridge, retaining wall and coastal protection asset stock, street
lighting and other associated assets. WebFRMS allows remote access,
ensures data consistency, streamlines workflows, enhances collaboration and
enhances and assists in the recording and management of:
4.9.1. Flood Incident Recording,
4.9.2. Watercourse Inspections,
4.9.3. Waterbody Assessments,
4.9.4. Schedule of Clearance and Repair Works,
4.9.5. Flood Protection Schemes Asset Register,
4.9.6. Providing resilience for flood and weather events.
4.10. Watercourse Inspections / Waterbody Assessments
The deployment of WebFRMS allows for a clearer approach to prioritising,
implementing and recording watercourse inspections as necessary under the
Flood Risk Management (Scotland) Act 2009 to inform Waterbody
Assessments. 
WebFRMS has allowed for detailed inspection of a number of watercourses –
allowing for river features and observation to be plotted and mapped on the
web-based system. The full implementation of this system will allow for
inspections to be carried out more accurately, more reliably, and on clear
frequency; with frequencies being based on the appropriate risk assessment
of each individual waterbody. 
Page 9

Page 10

4.11. Coastal Change Adaptation Plans / Shoreline Management Plans
The Scottish Government has developed a guidance to support local authorities
in preparation of Coastal Change Adaptation Plans. 
Argyll and Bute Council has secured funding from Scottish Government to
conduct case studies for six locations (Campbeltown, Helensburgh,
Garelochhead, Cardross, Rothesay and Kilchattan Bay) based on actions
identified for development of Shoreline Management Plans and Coastal
Adaptive Plans by the Local Flood Risk Management Plan Cycle 2. 
The first stage of the case studies, which involved an initial assessment of all
six areas, focused on understanding the risk of coastal erosion and flooding,
evaluating the associated economic impacts and identifying opportunities for
adaptation initiatives and actions. This stage has been completed. 
The Second stage of the case study focuses on a site-specific study and is
currently at a tendering stage. 
Additional funding has been secured by Argyll and Bute Council via 3
applications to support further Coastal Change Adaptation Plan (CCAP) case
studies for three additional areas: Inverlussa in Isle of Jura, the Isle of Tiree and
Laggan Bay in the Isle of Islay following erosion reports and community
consultation. These new case studies are currently at a tendering stage. 
5.0. CONCLUSION
5.1. This report provides an update on progress with flood risk management activities
across Argyll and Bute including news actions which are in development. 
6.0. IMPLICATIONS
6.1. Policy – Works are in accordance with the Local Flood Risk Management Plan  
2022 – 2028 as endorsed by Council and the Council’s Flood Risk Management
Policy.
Local Authorities have powers under Flood Risk Management (Scotland) Act
2009 “to manage flood risk and to take forward a flood protection scheme.”
6.2. Financial – The current capital and revenue budget allocation is supporting the
ongoing projects activities.
6.3. Legal – Support is requested as required, primarily in relation to riparian
ownership responsibilities.
6.4. HR – None.
6.5. Customer Service – None Known.
6.6. Risk – SEPA currently have issues with recent cyberattack and there is some
risk in terms of times frames.
Page 10

Page 11

6.7. Climate Change – Works are to discharge council’s duties under the Flood Risk
Management (Scotland) Act 2009 and to build resilience against climate
change. 
6.8. Fairer Scotland Duty – None.
6.9. Equalities - protected characteristics – None.
6.10. Consumer Duty – None Known.
6.11. Island Communities – Isle of Bute PVA (4.4.) and Antrim View, Islay (4.7.)
6.12. Children’s Rights and Wellbeing – None Known. 
Kirsty Flanagan, Executive Director with responsibility for Roads and
Infrastructure  
Councillor John Armour, Policy Lead for Roads, Transport and Amenity Services  
September 2025                                                           
For further information contact:  
Andy Summers, Head of Roads and Infrastructure Service
Andy.Summers@argyll-bute.gov.uk  
Elsa Simoes, Infrastructure Design Manager
Elsa.simoes@argyll-bute.gov.uk  
Jamie Salmon, Engineer
Jamie.salmon@argyll-bute.gov.uk 
Appendix A – Actions
Appendix B – LPD Wide 
Page 11

Page 12

This page is intentionally left blank

Page 13

Appendix A – Actions 
Actions relating to Target Areas
Actions which cover the whole Local Plan District (LPD). 
Columns C (RAG Status) and D (RAG status comment) have been populated with
current standing / status on actions from the Flood Risk Management Team. 
Contributions and review by Planning and Civil Contingencies team where
appropriate. 
Next step is to provide this information to Highland Council for inclusion in the
formalised S37 Interim Report. 
Page 13

Page 14

Classification: OFFICIAL#
LPD Target area
ID
Local
authority Target area name Action_ID Action type General description (called 'action' in final target area datasheets) Description of Action  for Cycle 2 Indicative
Delivery Co-ordination Funding Delivery Lead RAG status -
Interim Report
RAG status comment
Clyde and
Loch
Lomond
26 Argyll and
Bute
Helensburgh 2601 Property flood resilience
scheme
The proposed scheme to provide resilience measures against flooding for
individual buildings is to be taken forward to help prevent water entering
the property and to minimise flood damage.
As part of the Helensburgh Flood Protection Scheme property flood
resilience and resistance measures will be implemented.
See LFRMP
Delivery
Statement -
progression of
scheme
dependent upon
budget availability
Argyll and Bute Council  will co-ordinate with
Helensburgh Community Council and
individual business and property owners
Capital plus any available
external funding
ABC RED Scope, timescales and funding arrangements for Cycle 2 and 3
externally capital funded schemes are not yet confirmed.  Previous
(Cycle 1) capital funding was 80% Scottish Government with
Council being responsible for 20% (plus any additional spend over
budget estimate).
Scheme was submitted to SEPA for prioritisation in 2019.
Benefit Cost Ratio classification is 3 = Medium.
Unlikely to progress in Cycle 2 (2022-2028) due to capital funding
not being secured.
Clyde and
Loch
Lomond
26 Argyll and
Bute
Helensburgh 2602 Shoreline management
plan (coastal adaptive
plan)
An assessment of coastal flood and erosion risk is to be carried out. The
plan should include assessment of climate change and develop adaptive
approaches to allow for the impacts of climate change to be monitored,
understood and managed.
Progress the development of the shoreline management plan for the
Argyll and Bute coastline.
2026-2027 ABC to identify internal and external
stakeholders in accordance with Coastal
Change Adaptation Guidance
Capital ABC GREEN Flood Risk Management Team have secured additional ring-fenced
capital funding from Scottish Government's Coastal Change
Adaptation fund to conduct a case study at Helensburgh.  This was
based on actions identified for development of Shoreline
Management Plans and Coastal Adaptive Plans by the Local Flood
Risk Management Plan Cycle 2. 
Tender being progressed 2025 to allow Consultant to be appointed
for 2026-27 delivery.
Clyde and
Loch
Lomond
26 Argyll and
Bute
Helensburgh 2605 Surface water
management plan
Areas at risk of heavy or prolonged rainfall causing flooding due to water
ponding on man-made surfaces or overwhelming the drainage system
are to be identified. These priority areas will provide a baseline for the
identification of next steps in managing water ponding or over-whelmed
drainage systems. This should guide adaptive planning to allow for the
impacts of climate change to be monitored, understood and managed.
Develop and implement a surface water management plan to reduce the
risk of flooding from surface water and small watercourses in
Helensburgh. The impacts of climate change on flood risk should be
assessed. The results of the sewer flood risk assessment should be
considered. Opportunities to disconnect surface water from the
sewerage system should be identified. The surface water management
plan should be reviewed and updated regularly.
See LFRMP
Delivery
Statement -
progression of
scheme
dependent upon
budget availability
Argyll and Bute Council  will co-ordinate with
Helensburgh Community Council and
individual business and property owners
Capital plus any available
external funding
ABC AMBER LFRMP - for Cycle 2 -
Progress dependent on confirmation of existing committed
expenditure schemes against currently available funding . 
Confirmation of this is anticipated by December 2025.
Clyde and
Loch
Lomond
26 Argyll and
Bute
Helensburgh 2607 Flood scheme or
works design
The selected preferred approach for managing flood risk is to be
designed following the completion of the flood study, including
consideration of the long-term impacts of climate change. These can
include small scale works or works to improve catchment management.
This should guide adaptive planning to allow for the impacts of climate
change to be monitored, understood and managed.
Develop the detailed design of the flood protection scheme in
Helensburgh based on the preferred option from the flood study. The
preferred option consists of an initial cycle of property flood resistance
and resilience measures followed by construction of new revetments, as
well as set-back walls.
The responsible authority proposes this action as the best viable option
for managing flood risk in this community. The delivery of this action is
subject to capital funding being made available.
2028-2034 Argyll and Bute Council  will co-ordinate with
Helensburgh Community Council and
individual business and property owners
Capital plus any available
external funding
ABC RED Scope, timescales and funding arrangements for Cycle 2 and 3
externally capital funded schemes are not yet confirmed.  Previous
(Cycle 1) capital funding was 80% Scottish Government with
Council being responsible for 20% (plus any additional spend over
budget estimate).
Scheme was submitted to SEPA for prioritisation in 2019.
Benefit Cost Ratio classification is 3 = Medium.
This action is scheduled for Cycle 3 within SEPA FRMP Cycle 2.
Part of the process is adaptive solutions- the first being Property
Flood Resilience then structural solutions.
Clyde and
Loch
Lomond
26 Argyll and
Bute
Helensburgh 2608 Community
engagement
Community engagement is to continue to be carried out in the area by
the responsible authorities to raise awareness of flood risk.
The responsible authorities to continue to engage with the community,
with particular focus on the detailed design of the flood protection
scheme.
2028-2034 Argyll and bute Council  will co-ordinate with
Helensburgh Community Council and
individual business, property owners and
landowners
Revenue ABC GREEN 2608 is Cycle 3 therefore not listed in LFRMP Cycle 2 as C&LL do
not list Cycle 3.
Clyde and
Loch
Lomond
67 Argyll and
Bute
Kilcreggan 6701 Flood scheme or works
implementation
The flood scheme/works is to be built following agreement of the design,
costs and timescales.
Progress the flood works based on the detailed design. The works involve
refurbishment of an existing surface water channel and a new pipe
network which discharges to a watercourse.
The responsible authority proposes this action as the best viable option
for managing flood risk in this community. The delivery of this action is
subject to capital funding being made available.
2025 Argyll and bute Council  co-ordinated with
Scottish Water,Kilcreggan Community Council
and individual  property and land owners
Capital ABC GREEN Tigh Dearg Road Flood Alleviation Scheme substantially complete
and scheduled for certtified completion in 2025.
Clyde and
Loch
Lomond
67 Argyll and
Bute
Kilcreggan 6702 Surface water
management plan
Areas at risk of heavy or prolonged rainfall causing flooding due to water
ponding on man-made surfaces or overwhelming the drainage system
have been identified. Next steps in managing such water ponding or over-
whelmed drainage systems have been identified and should be
implemented. The plan is to be reviewed and updated as needed. 
Implement the surface water management plan. The plan should be
reviewed and updated regularly.
See LFRMP
Delivery
Statement -
progression of
scheme
dependent upon
budget availability
Argyll and bute Council  will co-ordinate with
Scottish Water, Kilcreggan Community Council
and individual  property and land owners
Capital / Revenue ABC AMBER Progress dependent on confirmation of existing committed
expenditure schemes against currently available funding . 
Confirmation of this is anticipated by December 2025.
Clyde and
Loch
Lomond
88 Argyll and
Bute
Rothesay and
Port Bannatyne
8801 Flood study An understanding of flood risk and associated issues in the area is to be
developed, which may include surveys and modelling and should
consider the impacts of climate change on flood risk. In areas where
flood risk is confirmed, a range of possible options to manage flood risk
are to be identified, including natural flood management actions where
suitable, and a preferred approach is to be chosen. This should include
adaptive planning to allow for the impacts of climate change to be
monitored, understood and managed.
A flood study should be carried out to address coastal and surface water
flood risk in Rothesay and Port Bannatyne. Using the best understanding
of current coastal processes and anticipated changes due to climate
change, flood modelling should be undertaken to review the standard of
protection offered by the coastal defences. Surface water flood
modelling should also be progressed and include the Lade area. The
impacts of climate change on flood risk should be evaluated. The
interactivity between coastal flooding and surface water flooding should
be assessed. If flood risk is confirmed, scoping of the next steps should be
completed.
Rothesay - 2024
Port Bannatyne -
See LFRMP
Delivery
Statement -
progression of
scheme
dependent upon
budget availability
Argyll and bute Council  coordinated / will co-
ordinate with Scottish Water, Community
Council and individual  property and land
owners
Capital/ Revenue plus any
available external funding
ABC AMBER Rothesay Flood Study completed (using  Revenue Funding)
Progress on Port Bannatyne Flood Study is dependent on
confirmation of existing committed expenditure schemes against
currently available funding .  Confirmation of this is anticipated by
December 2025.
Clyde and
Loch
Lomond
88 Argyll and
Bute
Rothesay and
Port Bannatyne
8802 Flood defence
maintenance
The existing flood defences are to be maintained by the asset owner to
ensure they are in good condition. 
Maintenance to the Rothesay Flood Protection Scheme should continue
and updates to the maintenance regime be made based on the findings
of the flood study.
Ongoing ABC internal stakeholders Infrastructure
Design and Roads Operations
Revenue ABC GREEN Ongoing & in hand
Clyde and
Loch
Lomond
100 Argyll and
Bute
Sandbank 10001 Flood scheme or
works design
The selected preferred approach for managing flood risk is to be
designed following the completion of the flood study, including
consideration of the long-term impacts of climate change. These can
include small scale works or works to improve catchment management.
This should guide adaptive planning to allow for the impacts of climate
change to be monitored, understood and managed.
Further development of the preferred option may be required prior to
commencing with the detailed design. Argyll and Bute Council to develop
the detailed design of the flood protection works in Sandhaven,
Sandbank based on the preferred option from the surface water
management plan. The preferred option identified to mitigate surface
water flooding is a small embankment with discharge to open channel.
The responsible authority proposes this action as the best viable option
for managing flood risk in this community. The delivery of this action is
subject to capital funding being made available.
See LFRMP
Delivery
Statement -
progression of
scheme
dependent upon
budget availability
Argyll and bute Council  will co-ordinate with
Sandbank Community Council and individual 
property and land owners
Capital ABC RED Scope, timescales and funding arrangements for Cycle 2 and 3
externally capital funded schemes are not yet confirmed.  Previous
(Cycle 1) capital funding was 80% Scottish Government with
Council being responsible for 20% (plus any additional spend over
budget estimate).
Scheme was submitted to SEPA for prioritisation in 2019.
Benefit Cost Ratio classification is 1 = Very High.
Unlikely to progress in Cycle 2 (2022-2028) due to capital funding
not being secured.
Clyde and
Loch
Lomond
100 Argyll and
Bute
Sandbank 10002 Flood scheme or works
implementation
The flood scheme/works is to be built following agreement of the design,
costs and timescales.
Progress the flood works based on the detailed design.
The responsible authority proposes this action as the best viable option
for managing flood risk in this community. The delivery of this action is
subject to capital funding being made available.
See LFRMP
Delivery
Statement -
progression of
scheme
dependent upon
budget availability
Argyll and bute Council  will co-ordinate with
Sandbank Community Council and individual 
property and land owners
Capital ABC RED Scope, timescales and funding arrangements for Cycle 2 and 3
externally capital funded schemes are not yet confirmed.  Previous
(Cycle 1) capital funding was 80% Scottish Government with
Council being responsible for 20% (plus any additional spend over
budget estimate).
Scheme was submitted to SEPA for prioritisation in 2019.
Benefit Cost Ratio classification is 1 = Very High.
Unlikely to progress in Cycle 2 (2022-2028) due to capital funding
not being secured.
Clyde and
Loch
Lomond
100 Argyll and
Bute
Sandbank 10003 Community
engagement
Community engagement is to continue to be carried out in the area by
the responsible authorities to raise awareness of flood risk.
The responsible authorities to continue to engage with the community,
with particular focus on the detailed design of the flood protection
works.
Ongoing Argyll and bute Council  will co-ordinate with
Sandbank Community Council and individual 
property and land owners
Revenue ABC AMBER No progression with scheme limits engagement with stakeholders
Clyde and
Loch
Lomond
100 Argyll and
Bute
Sandbank 10005 Surface water
management plan
Areas at risk of heavy or prolonged rainfall causing flooding due to water
ponding on man-made surfaces or overwhelming the drainage system
have been identified. Next steps in managing such water ponding or over-
whelmed drainage systems have been identified and should be
implemented. The plan is to be reviewed and updated as needed. 
Implement the surface water management plan. The plan should be
reviewed and updated regularly.
Ongoing Argyll and bute Council  will co-ordinate with
Scottish Water, Sandbank Community Council
and individual  property and land owners
Capital / Revenue ABC AMBER No progression with schemes identified in Cycle 1. Other  hot spots
identified since Cycle 1 need to be investigated and added to
SWMP.
Progress dependent on confirmation of existing committed
expenditure schemes against currently available funding . 
Confirmation of this is anticipated by December 2025.
Clyde and
Loch
Lomond
105 Argyll and
Bute
Cardross 10501 Flood study An understanding of flood risk and associated issues in the area is to be
developed, which may include surveys and modelling and should
consider the impacts of climate change on flood risk. In areas where
flood risk is confirmed, a range of possible options to manage flood risk
are to be identified, including natural flood management actions where
suitable, and a preferred approach is to be chosen. This should include
adaptive planning to allow for the impacts of climate change to be
monitored, understood and managed.
A flood study should be carried out to improve understanding of coastal,
river and surface water flood risk in Cardross. The interactivity between
sources of flooding should be assessed. The impacts of climate change on
flood risk should be evaluated. If flood risk is confirmed, scoping of the
next steps should be completed. Data collection may also be included.
Argyll and Bute Council to consider installing rain and river monitors on
Kilmahew Burn.
See LFRMP
Delivery
Statement -
progression of
scheme
dependent upon
budget availability
Argyll and bute Council  will co-ordinate with
Scottish Water,Cardross Community Council
and individual  property and land owners
Capital ABC AMBER Progress dependent on confirmation of existing committed
expenditure schemes against currently available funding . 
Confirmation of this is anticipated by December 2025.
Clyde and
Loch
Lomond
105 Argyll and
Bute
Cardross 10502 Shoreline management
plan (coastal adaptive
plan)
An assessment of coastal flood and erosion risk is to be carried out. The
plan should include assessment of climate change and develop adaptive
approaches to allow for the impacts of climate change to be monitored,
understood and managed.
Progress the development of the shoreline management plan for the
Argyll and Bute coastline.
2026-2027 ABC to identify internal and external
stakeholders in accordance with Coastal
Change Adaptation Guidance
Capital ABC GREEN Flood Risk Management Team have secured additional ring-fenced
capital funding from Scottish Government's Coastal Change
Adaptation fund to conduct a case study at Cardross.  This was
based on actions identified for development of Shoreline
Management Plans and Coastal Adaptive Plans by the Local Flood
Risk Management Plan Cycle 2. 
Tender being progressed 2025 to allow Consultant to be appointed
for 2026-27 delivery.
Clyde and
Loch
Lomond
107 Argyll and
Bute
Dunoon 10701 Flood scheme or
works design
The selected preferred approach for managing flood risk is to be
designed following the completion of the flood study, including
consideration of the long-term impacts of climate change. These can
include small scale works or works to improve catchment management.
This should guide adaptive planning to allow for the impacts of climate
change to be monitored, understood and managed.
Further development of the preferred option may be required prior to
commencing with the detailed design. Argyll and Bute Council to develop
the detailed design of the flood protection works in Black Park (Ash Park),
Dunoon based on the preferred option from the surface water
management plan. The preferred option identified to mitigate flooding is
a filtration trench discharging to the combined sewer.
The responsible authority proposes this action as the best viable option
for managing flood risk in this community. The delivery of this action is
subject to capital funding being made available.
See LFRMP
Delivery
Statement -
progression of
scheme
dependent upon
budget availability
Argyll and bute Council  will co-ordinate with
Scottish Water,Utilities, Dunoon Community
Council and individual  property and land
owners
Capital plus any available
external funding
ABC RED Scope, timescales and funding arrangements for Cycle 2 and 3
externally capital funded schemes are not yet confirmed.  Previous
(Cycle 1) capital funding was 80% Scottish Government with
Council being responsible for 20% (plus any additional spend over
budget estimate).
Scheme was submitted to SEPA for prioritisation in 2019.
Benefit Cost Ratio classification is 1 = Very High.
Unlikely to progress in Cycle 2 (2022-2028) due to capital funding
not being secured.
Clyde and
Loch
Lomond
107 Argyll and
Bute
Dunoon 10702 Flood scheme or works
implementation
The flood scheme/works is to be built following agreement of the design,
costs and timescales.
Argyll and Bute Council to progress the flood works based on the detailed
design.
The responsible authority proposes this action as the best viable option
for managing flood risk in this community. The delivery of this action is
subject to capital funding being made available.
See LFRMP
Delivery
Statement -
progression of
scheme
dependent upon
budget availability
Argyll and bute Council  will co-ordinate with
Scottish Water,Utilities, Dunoon Community
Council and individual  property and land
owners
Capital plus any available
external funding
ABC RED Scope, timescales and funding arrangements for Cycle 2 and 3
externally capital funded schemes are not yet confirmed.  Previous
(Cycle 1) capital funding was 80% Scottish Government with
Council being responsible for 20% (plus any additional spend over
budget estimate).
Scheme was submitted to SEPA for prioritisation in 2019.
Benefit Cost Ratio classification is 1 = Very High.
Unlikely to progress in Cycle 2 (2022-2028) due to capital funding
not being secured.
Clyde and
Loch
Lomond
107 Argyll and
Bute
Dunoon 10703 Community
engagement
Community engagement is to continue to be carried out in the area by
the responsible authorities to raise awareness of flood risk.
The responsible authorities to continue to engage with the community,
with particular focus on the detailed design of the flood protection
works.
Ongoing Argyll and bute Council  will co-ordinate with
Scottish Water,Utilities, Dunoon Community
Council and individual  property and land
owners
Capital plus any available
external funding
ABC GREEN Various ABC teams involved including Infrastructure Design, Roads
Operations, Community Resilience and Estates
Clyde and
Loch
Lomond
107 Argyll and
Bute
Dunoon 10704 Flood study An understanding of flood risk and associated issues in the area is to be
developed, which may include surveys and modelling and should
consider the impacts of climate change on flood risk. In areas where
flood risk is confirmed, a range of possible options to manage flood risk
are to be identified, including natural flood management actions where
suitable, and a preferred approach is to be chosen. This should include
adaptive planning to allow for the impacts of climate change to be
monitored, understood and managed.
Argyll and Bute Council to carry out a flood study to address flood risk
from the Milton Burn in Dunoon. This includes a review of the Milton
Burn Flood Protection Scheme (2012) and Kilbride Road, Dunoon Flood
Prevention Scheme (2007). The impacts of climate change on flood risk
should be evaluated. If flood risk is confirmed, scoping of the next steps
should be completed.
See LFRMP
Delivery
Statement -
progression of
scheme
dependent upon
budget availability
Argyll and bute Council  will co-ordinate with
SEPA, Scottish Water,Utilities, Dunoon
Community Council and individual  property
and land owners
Capital plus any available
external funding
ABC AMBER Progress dependent on confirmation of existing committed
expenditure schemes against currently available funding . 
Confirmation of this is anticipated by December 2025.
Clyde and
Loch
Lomond
107 Argyll and
Bute
Dunoon 10705 Flood defence
maintenance
The existing flood defences are to be maintained by the asset owner to
ensure they are in good condition. 
Continue to maintain the Milton Burn Flood Protection Scheme (2012),
Kilbride Road, Dunoon Flood Prevention Scheme (2007) and other
existing flood defences in Dunoon.
Ongoing ABC internal stakeholders Infrastructure
Design and Roads Operations
Revenue ABC GREEN Ongoing & in hand
Clyde and
Loch
Lomond
107 Argyll and
Bute
Dunoon 10707 Surface water
management plan
Areas at risk of heavy or prolonged rainfall causing flooding due to water
ponding on man-made surfaces or overwhelming the drainage system
have been identified. Next steps in managing such water ponding or over-
whelmed drainage systems have been identified and should be
implemented. The plan is to be reviewed and updated as needed. 
Argyll and Bute Council to implement the surface water management
plan. The plan should be reviewed and updated regularly.
Ongoing Argyll and bute Council  will co-ordinate with
Scottish Water, Sandbank Community Council
and individual  property and land owners
Capital / Revenue ABC AMBER Progress dependent on confirmation of existing committed
expenditure schemes against currently available funding . 
Confirmation of this is anticipated by December 2025.
Clyde and
Loch
Lomond
111 Argyll and
Bute
Garelochhead 11101 Flood study An understanding of flood risk and associated issues in the area is to be
developed, which may include surveys and modelling and should
consider the impacts of climate change on flood risk. In areas where
flood risk is confirmed, a range of possible options to manage flood risk
are to be identified, including natural flood management actions where
suitable, and a preferred approach is to be chosen. This should include
adaptive planning to allow for the impacts of climate change to be
monitored, understood and managed.
A flood study should be carried out to improve understanding of coastal
flood risk in Garelochhead. The interactivity between coastal and other
sources of flooding should be assessed. The impacts of climate change on
flood risk should be evaluated. If flood risk is confirmed, scoping of the
next steps should be completed. Data collection may also be included.
2026-2027 ABC to identify internal and external
stakeholders in accordance with Coastal
Change Adaptation Guidance
Capital ABC AMBER Progress dependent on confirmation of existing committed
expenditure schemes against currently available funding . 
Confirmation of this is anticipated by December 2025.
Clyde and
Loch
Lomond
111 Argyll and
Bute
Garelochhead 11102 Shoreline management
plan (coastal adaptive
plan)
An assessment of coastal flood and erosion risk is to be carried out. The
plan should include assessment of climate change and develop adaptive
approaches to allow for the impacts of climate change to be monitored,
understood and managed.
Progress the development of the shoreline management plan for the
Argyll and Bute coastline.
2026-2027 ABC to identify internal and external
stakeholders in accordance with Coastal
Change Adaptation Guidance
Capital ABC GREEN Flood Risk Management Team have secured additional ring-fenced
capital funding from Scottish Government's Coastal Change
Adaptation fund to conduct a case study at Garelochhead.  This
was based on actions identified for development of Shoreline
Management Plans and Coastal Adaptive Plans by the Local Flood
Risk Management Plan Cycle 2. 
Tender being progressed 2025 to allow Consultant to be appointed
for 2026-27 delivery.
Clyde and
Loch
Lomond
116 Argyll and
Bute
Kilchattan Bay 11602 Shoreline management
plan (coastal adaptive
plan)
An assessment of coastal flood and erosion risk is to be carried out. The
plan should include assessment of climate change and develop adaptive
approaches to allow for the impacts of climate change to be monitored,
understood and managed.
Progress the development of the shoreline management plan for the
Argyll and Bute coastline.
2026-2027 ABC to identify internal and external
stakeholders in accordance with Coastal
Change Adaptation Guidance
Capital ABC GREEN Flood Risk Management Team have secured additional ring-fenced
capital funding from Scottish Government's Coastal Change
Adaptation fund to conduct a case study at Kilchattan Bay.  This
was based on actions identified for development of Shoreline
Management Plans and Coastal Adaptive Plans by the Local Flood
Risk Management Plan Cycle 2. 
Tender being progressed 2025 to allow Consultant to be appointed
for 2026-27 delivery.
Highland
and Argyll
346 Argyll and
Bute
Campbeltown 34602 Surface water
management plan
Areas at risk of heavy or prolonged rainfall causing flooding due to water
ponding on man-made surfaces or overwhelming the drainage system
have been identified. Next steps in managing such water ponding or over-
whelmed drainage systems have been identified and should be
implemented. The plan is to be reviewed and updated as needed. 
Implement the Campbeltown Surface Water Management Plan which
will help to manage residual surface water and sewer flood risk. In the
Meadows and Burnside Square areas road gullies will be disconnected
from the combined sewer network with drainage held in above ground
and below ground storage basins, for a controlled release back into the
combined system. Additional properties are targeted for property level
flood resilience.
2023-2025 Land and property owners Capital Funded ABC GREEN Campbeltown Flood Protection Scheme main works contract
completed May 2024.  Included Meadows & Burnside Square SuDS
schemes.
Property level flood resilience measures ongoing
Highland
and Argyll
346 Argyll and
Bute
Campbeltown 34603 Shoreline management
plan (coastal adaptive
plan)
An assessment of coastal flood and erosion risk is to be carried out. The
plan should include assessment of climate change and develop adaptive
approaches to allow for the impacts of climate change to be monitored,
understood and managed.
Progress the shoreline management plan. This should consider the
impacts of sea level rise on future flood risk. The need for an adaptation
plan should be assessed.
Ongoing Council stakeholders including Corporate
Resilience, Land UsePlanning, Roads
Operations, Network and standards, Economic
Development, Marine Operations, Coastal
Development Estates and Property, Local
Biodiversity, Climate Change Officer     
External stakeholders including SEPA, Nature
Scot, ACHA, NTS, MOD, Community Council,
HIE, Community Council
Capital  plus any available
external funding
ABC GREEN Flood Risk Management Team have secured additional ring-fenced
capital funding from Scottish Government's Coastal Change
Adaptation fund to conduct a case study at Campbeltown.  This
was based on actions identified for development of Shoreline
Management Plans and Coastal Adaptive Plans by the Local Flood
Risk Management Plan Cycle 2. 
Tender being progressed 2025 to allow Consultant to be appointed
for 2026-27 delivery.
August 2025 developing stakeholder engagement and project
governance
#OFFICIAL
Page 14

Page 15

Classification: OFFICIAL#
Highland
and Argyll
346 Argyll and
Bute
Campbeltown 34604 Flood scheme or works
implementation
The flood scheme/works is to be built following agreement of the design,
costs and timescales.
Progress the Campbeltown Flood Protection Scheme. As built drawings
should be made available to SEPA, for consideration in the Scottish Flood
Defence Asset Database, flood map improvements and flood warning
scheme updates.
Complete Land and property owners Capital  plus any available
external funding
ABC GREEN Campbeltown Flood Protection Scheme main works contract
completed May 2024.  Included Millknowe Flood Storage Reservoir
and Dalaruan Culvert.
As Built Records being incorporated into ne WebFRMS asset
managemnt system and shall be available to SEPA for SFDAD
replacement.
Highland
and Argyll
347 Argyll and
Bute
Taynuilt and
Brochroy
34702 Shoreline management
plan (coastal adaptive
plan)
An assessment of coastal flood and erosion risk is to be carried out. The
plan should include assessment of climate change and develop adaptive
approaches to allow for the impacts of climate change to be monitored,
understood and managed.
Progress the development of the shoreline management plan for the
Argyll and Bute coastline.
2028 - 2034 Argyll and Bute Council will co-ordinate with
internal and external stakeholders in
accordance with Scottish Government Coastal
Change Adaptation Guidance.
Capital plus any available
external funding
ABC GREEN Cycle 3 action.
Progression will be dependent on available budget
Highland
and Argyll
347 Argyll and
Bute
Taynuilt and
Brochroy
34703 Flood study An understanding of flood risk and associated issues in the area is to be
developed, which may include surveys and modelling and should
consider the impacts of climate change on flood risk. In areas where
flood risk is confirmed, a range of possible options to manage flood risk
are to be identified, including natural flood management actions where
suitable, and a preferred approach is to be chosen. This should include
adaptive planning to allow for the impacts of climate change to be
monitored, understood and managed.
The results of the shoreline management plan and revised flood maps
should be reviewed. The influence of high tides and surge on flooding
from the River Nant should be assessed. The impacts of sea level rise and
climate change on flood risk should be considered.
2028 - 2034 Argyll and Bute Council will co-ordinate with
internal and external stakeholders in
accordance with Scottish Government Coastal
Change Adaptation Guidance.
Capital plus any available
external funding
ABC GREEN Cycle 3 action.
Progression will be dependent on available budget
Highland
and Argyll
353 Argyll and
Bute
Clachan 35301 Flood scheme or
works design
The selected preferred approach for managing flood risk is to be
designed following the completion of the flood study, including
consideration of the long-term impacts of climate change. These can
include small scale works or works to improve catchment management.
This should guide adaptive planning to allow for the impacts of climate
change to be monitored, understood and managed.
Develop the detailed design of the flood protection works in Clachan
based on the preferred option from the flood study. The preferred option
includes removal of a weir structure from the Clachan Burn and property
flood resilience.
The responsible authority proposes this action as the best viable option
for managing flood risk in this community. The delivery of this action is
subject to capital funding being made available.
To be confirmed -
progression
dependent upon
budget availability
West Kintyre Community Counciland property
owners
Capital plus any available
external funding
ABC RED Scope, timescales and funding arrangements for Cycle 2 and 3
externally capital funded schemes are not yet confirmed.  Previous
(Cycle 1) capital funding was 80% Scottish Government with
Council being responsible for 20% (plus any additional spend over
budget estimate).
Scheme was submitted to SEPA for prioritisation in 2019.
Benefit Cost Ratio classification is 3 = Medium.
Unlikely to progress in Cycle 2 (2022-2028) due to capital funding
not being secured.
Highland
and Argyll
353 Argyll and
Bute
Clachan 35302 Flood scheme or works
implementation
The flood scheme/works is to be built following agreement of the design,
costs and timescales.
Progress the flood protection works in Clachan based on the detailed
design. As built drawings should be made available to SEPA, for
consideration in the Scottish Flood Defence Asset Database, flood map
updates and flood warning scheme updates.
The responsible authority proposes this action as the best viable option
for managing flood risk in this community. The delivery of this action is
subject to capital funding being made available.
To be confirmed -
progression
dependent upon
budget availability
Land and property owners Capital plus any available
external funding
ABC RED Scope, timescales and funding arrangements for Cycle 2 and 3
externally capital funded schemes are not yet confirmed.  Previous
(Cycle 1) capital funding was 80% Scottish Government with
Council being responsible for 20% (plus any additional spend over
budget estimate).
Scheme was submitted to SEPA for prioritisation in 2019.
Benefit Cost Ratio classification is 3 = Medium.
Unlikely to progress in Cycle 2 (2022-2028) due to capital funding
not being secured.
Highland
and Argyll
353 Argyll and
Bute
Clachan 35303 Community
engagement
Community engagement is to continue to be carried out in the area by
the responsible authorities to raise awareness of flood risk.
Argyll and Bute Council completed three community consultation events
during the flood study and during the appraisal of options. The
responsible authorities to continue to engage with the community and
the community flood group, with particular focus on the detailed design
of the flood protection works.
Ongoing Argyll and Bute Council will work with
Community flood resilience group/ West
Kintyre Community Council , land and
property owners.
Revenue ABC GREEN Ongoing
Highland
and Argyll
353 Argyll and
Bute
Clachan 35305 Community flood alert A community river level alerting system is to be installed to provide
information on the potential for localised flooding.
A river level alerting system is being installed with the help of the
Scottish Flood Forum.
Complete Argyll and Bute councilCommunity resilience
group/ West Kintyre Community Council
Community Council, land and property owners
Revenue ABC GREEN ABC to liaise with SFF and West Kintyre Community Council.
Highland
and Argyll
361 Argyll and
Bute
Tarbert 36101 Flood scheme or
works design
The selected preferred approach for managing flood risk is to be
designed following the completion of the flood study, including
consideration of the long-term impacts of climate change. These can
include small scale works or works to improve catchment management.
This should guide adaptive planning to allow for the impacts of climate
change to be monitored, understood and managed.
Further development of the preferred option may be required prior to
commencing with the detailed design. Develop the detailed design of the
Tarbert Flood Protection Scheme based on the preferred option from the
flood study. The preferred option consists of flood defence walls and
demountable defences. Property flood resilience is to be provided
outwith the scheme extent.
The responsible authority proposes this action as the best viable option
for managing flood risk in this community. The delivery of this action is
subject to capital funding being made available.
To be confirmed -
progression
dependent upon
budget availability
Argyll and Bute Council will work with Tarbert
& Skipness Community Council and individual
property owners to deliver the scheme.
Capital plus any available
external funding
ABC RED Scope, timescales and funding arrangements for Cycle 2 and 3
externally capital funded schemes are not yet confirmed.  Previous
(Cycle 1) capital funding was 80% Scottish Government with
Council being responsible for 20% (plus any additional spend over
budget estimate).
Scheme was submitted to SEPA for prioritisation in 2019.
Benefit Cost Ratio classification is 3 = Medium.
Unlikely to progress in Cycle 2 (2022-2028) due to capital funding
not being secured.
Highland
and Argyll
361 Argyll and
Bute
Tarbert 36102 Flood scheme or works
implementation
The flood scheme/works is to be built following agreement of the design,
costs and timescales.
Progress the Tarbert Flood Protection Scheme based on the detailed
design. As built drawings should be made available to SEPA, for
consideration in the Scottish Flood Defence Asset Database, flood map
updates and flood warning scheme updates.
The responsible authority proposes this action as the best viable option
for managing flood risk in this community. The delivery of this action is
subject to capital funding being made available.
To be confirmed -
progression
dependent upon
budget availability
Argyll and Bute Council will work with Tarbert
& Skipness Community Council and individual
property owners to deliver the scheme.
Capital plus any available
external funding
ABC RED Scope, timescales and funding arrangements for Cycle 2 and 3
externally capital funded schemes are not yet confirmed.  Previous
(Cycle 1) capital funding was 80% Scottish Government with
Council being responsible for 20% (plus any additional spend over
budget estimate).
Scheme was submitted to SEPA for prioritisation in 2019.
Benefit Cost Ratio classification is 3 = Medium.
Unlikely to progress in Cycle 2 (2022-2028) due to capital funding
not being secured.
Highland
and Argyll
361 Argyll and
Bute
Tarbert 36103 Community
engagement
Community engagement is to continue to be carried out in the area by
the responsible authorities to raise awareness of flood risk.
The responsible authorities to continue to engage with the community,
with particular focus on the detailed design of the flood protection
scheme.
Ongoing Argyll and Bute Council liaises with Tarbert &
Skipness Community Council  and land and
property owners
Revenue ABC GREEN Various ABC teams involved including Infrastructure Design, Roads
Operations, Community Resilience and Estates
Highland
and Argyll
361 Argyll and
Bute
Tarbert 36105 Surface water
management plan
Areas at risk of heavy or prolonged rainfall causing flooding due to water
ponding on man-made surfaces or overwhelming the drainage system
are to be identified. These priority areas will provide a baseline for the
identification of next steps in managing water ponding or over-whelmed
drainage systems. This should guide adaptive planning to allow for the
impacts of climate change to be monitored, understood and managed.
Develop and implement a surface water management plan. This should
be reviewed and updated regularly. The impacts of climate change on
flood risk should be assessed. The results of the sewer flood risk
assessment should be considered. Opportunities to disconnect surface
water from the sewerage system should be identified. The plan should be
reviewed and updated regularly.
To be confirmed -
progression
dependent upon
budget availability
Argyll and Bute Council will work with Tarbert
& Skipness Community Council and land and
property owners
Capital plus any available
external funding
ABC AMBER Progress dependent on confirmation of existing committed
expenditure schemes against currently available funding . 
Confirmation of this is anticipated by December 2025.
Highland
and Argyll
364 Argyll and
Bute
Inveraray 36402 Shoreline management
plan (coastal adaptive
plan)
An assessment of coastal flood and erosion risk is to be carried out. The
plan should include assessment of climate change and develop adaptive
approaches to allow for the impacts of climate change to be monitored,
understood and managed.
Progress the shoreline management plan. This should consider the
impacts of sea level rise on future flood risk. The need for an adaptation
plan should be assessed.
2028 - 2034 Argyll and Bute Council will co-ordinate with
internal and external stakeholders in
accordance with Scottish Government Coastal
Change Adaptation Guidance.
Capital plus any available
external funding
ABC GREEN Cycle 3 (2028-2034)
Progression will be dependent on available budget
Highland
and Argyll
365 Argyll and
Bute
Lochgilphead 36501 Property flood resilience
scheme
The proposed scheme to provide resilience measures against flooding for
individual buildings is to be taken forward to help prevent water entering
the property and to minimise flood damage.
The Lochgilphead Flood Study (2019) identified property flood resilience
as the preferred option for managing the risk of flooding. (There were no
economically viable options for river flooding). Argyll and Bute Council
presented implementation of a property flood protection scheme on a
grant basis with homeowner maintenance. Argyll and Bute Council to
progress this in combination with community engagement and
promotion of self help. The responsible authority proposes this action as
the best viable option for managing flood risk in this community. The
delivery of this action is subject to capital funding being made available.
To be confirmed -
progression
dependent upon
budget availability
Argyll and Bute Council will work with
Lochgilphead Community Council and
individual property owners
Capital plus any available
external funding
ABC RED Scope, timescales and funding arrangements for Cycle 2 and 3
externally capital funded schemes are not yet confirmed.  Previous
(Cycle 1) capital funding was 80% Scottish Government with
Council being responsible for 20% (plus any additional spend over
budget estimate).
Scheme was submitted to SEPA for prioritisation in 2019.
Benefit Cost Ratio classification is 2 = High.
Unlikely to progress in Cycle 2 (2022-2028) due to capital funding
not being secured.
Highland
and Argyll
365 Argyll and
Bute
Lochgilphead 36503 Shoreline management
plan (coastal adaptive
plan)
An assessment of coastal flood and erosion risk is to be carried out. The
plan should include assessment of climate change and develop adaptive
approaches to allow for the impacts of climate change to be monitored,
understood and managed.
Progress the development of the shoreline management plan for the
Argyll and Bute coastline.
2028 - 2034 Argyll and Bute Council will co-ordinate with
internal and external stakeholders in
accordance with Scottish Government Coastal
Change Adaptation Guidance.
Capital plus any available
external funding
ABC GREEN Cycle 3 (2028-2034)
Progression will be dependent on available budget
Highland
and Argyll
365 Argyll and
Bute
Lochgilphead 36504 Flood study An understanding of flood risk and associated issues in the area is to be
developed, which may include surveys and modelling and should
consider the impacts of climate change on flood risk. In areas where
flood risk is confirmed, a range of possible options to manage flood risk
are to be identified, including natural flood management actions where
suitable, and a preferred approach is to be chosen. This should include
adaptive planning to allow for the impacts of climate change to be
monitored, understood and managed.
A flood study should be carried out to further investigate the feasibility of
potential options to manage river flood risk in Lochgilphead.
2028 - 2034 Argyll and Bute Council will work with
Lochgilphead Community Council and
individual property owners to deliver the
scheme.
Capital plus any available
external funding
ABC GREEN Cycle 3 (2028-2034)
Progression will be dependent on available budget
Highland
and Argyll
366 Argyll and
Bute
Oban 36601 Flood scheme or
works design
The selected preferred approach for managing flood risk is to be
designed following the completion of the flood study, including
consideration of the long-term impacts of climate change. These can
include small scale works or works to improve catchment management.
This should guide adaptive planning to allow for the impacts of climate
change to be monitored, understood and managed.
Develop the detailed design of the Oban Flood Protection Scheme based
on the preferred option from the flood study. The preferred option
consists of a combined flood storage and direct defence solution to
protect against flooding from the Black Lynn and property flood
resilience to protect against coastal flooding. Some more work is
required on the surface water element.
The responsible authority proposes this action as the best viable option
for managing flood risk in this community. The delivery of this action is
subject to capital funding being made available.
In accordance with the flood risk management plan, as part of the
scheme or works, the responsible authority should aim to ensure the
action will not have an adverse effect on the integrity of the Inner
Hebrides and the Minches Special Area of Conservation.
To be confirmed -
progression
dependent upon
budget availability
Argyll and Bute Council will work with Scottish
Water, Oban Community Council, Forestry
and Land Scotland,  land and property owners
to deliver the scheme.
Capital/ Revenue plus any
available external funding
ABC RED Scope, timescales and funding arrangements for Cycle 2 and 3
externally capital funded schemes are not yet confirmed.  Previous
(Cycle 1) capital funding was 80% Scottish Government with
Council being responsible for 20% (plus any additional spend over
budget estimate).
Scheme was submitted to SEPA for prioritisation in 2019.
Benefit Cost Ratio classification is 2 = High.
Unlikely to progress in Cycle 2 (2022-2028) due to capital funding
not being secured.
Highland
and Argyll
366 Argyll and
Bute
Oban 36602 Flood scheme or works
implementation
The flood scheme/works is to be built following agreement of the design,
costs and timescales.
Progress the Oban Flood Protection Scheme based on the detailed
design. As built drawings should be made available to SEPA, for
consideration in the Scottish Flood Defence Asset Database, flood map
updates and flood warning scheme updates.
The responsible authority proposes this action as the best viable option
for managing flood risk in this community. The delivery of this action is
subject to capital funding being made available.
To be confirmed -
progression
dependent upon
budget availability
Argyll and Bute Council will work with Scottish
Water, Oban Community Council, Forestry
and Land Scotland,  land and property owners
to deliver the scheme. As Built drawings will
be provided to SEPA to support any flood map
or flood warning updates.
Capital/ Revenue plus any
available external funding
ABC RED Scope, timescales and funding arrangements for Cycle 2 and 3
externally capital funded schemes are not yet confirmed.  Previous
(Cycle 1) capital funding was 80% Scottish Government with
Council being responsible for 20% (plus any additional spend over
budget estimate).
Scheme was submitted to SEPA for prioritisation in 2019.
Benefit Cost Ratio classification is 2 = High.
Unlikely to progress in Cycle 2 (2022-2028) due to capital funding
not being secured.
Highland
and Argyll
366 Argyll and
Bute
Oban 36603 Community
engagement
Community engagement is to continue to be carried out in the area by
the responsible authorities to raise awareness of flood risk.
The responsible authorities to continue to engage with the community,
with particular focus on the detailed design of the flood protection
scheme.
Ongoing Argyll and Bute Council liaises with Oban
Community Council and land and property
owners
Revenue ABC GREEN Various ABC teams involved including Infrastructure Design, Roads
Operations, Community Resilience and Estates
Highland
and Argyll
366 Argyll and
Bute
Oban 36604 Surface water
management plan
Areas at risk of heavy or prolonged rainfall causing flooding due to water
ponding on man-made surfaces or overwhelming the drainage system
have been identified. Next steps in managing such water ponding or over-
whelmed drainage systems have been identified and should be
implemented. The plan is to be reviewed and updated as needed. 
Implement the surface water management plan. The plan should be
reviewed and updated regularly.
Ongoing Scottish Water  along with Land and Property
Owners
Capital/ Revenue plus any
available external funding
ABC AMBER Maintenance works carried out at Lochavullin (Target Area).
Larger projects in the SWMP are dependent on securing additional
capital funding.
#OFFICIAL
Page 15

Page 16

This page is intentionally left blank

Page 17

Appendix B – LPD Wide
Actions which cover the whole Local Plan District (LPD). 
Columns C (RAG Status) and D (RAG status comment) have been populated with
current standing / status on actions from the Flood Risk Management Team. 
Contributions and review by Planning and Civil Contingencies team where
appropriate. 
Next step is to provide this information to Highland Council for inclusion in the
formalised S37 Interim Report. 
Page 17

Page 18

Classification: OFFICIAL#
Action General description RAG status - Interim Report RAG status comment
Awareness
raising
SEPA, the Responsible Authorities and other organisations such as the Scottish Flood Forum
work together through national and local initiatives to help communities understand the risk of
flooding and what actions individuals can take. Improved awareness of flood risk and actions
that prepare individuals, homes and businesses for flooding can reduce the overall impact of
flooding.
Local authorities will undertake additional awareness raising activities when developing any
specific project proposals and will engage with community resilience groups and local
communities.
Scottish Flood Forum support flood risk communities by raising community awareness,
promoting self-help, developing community groups and establish a recovery support
programme after a flood.
GREEN Argyll and Bute Council have promoted flood advice for property owners and landowners
on our website https://www.argyll-bute.gov.uk/transport-and-streets/flood-advice.  In
addition, we are now working with our Climate Change Officer and ABCAN to support
communities in carrying out area-based risk assessments and, where possible,
implementing local mitigation measures. This work highlights the importance of
embedding community resilience, particularly in areas where flood risk has been
identified
Data to support
climate
resilience
As Scotland’s hydrometric authority, SEPA operates a network of stations to measure river
level, flow, rainfall, sea level, loch and groundwater level. The data goes into a long term data
archive and is critical to underpin all flood risk management activities including flood warning,
flood mapping, design of flood protection and sustainable development as well as supporting a
range of regulatory and recreational uses.
SEPA will continue to maintain and develop its hydrometric network, contribute to UK and
international data archives, and improve and update the datasets used for flood frequency
analysis.
SEPA will support research and development of data, methods and guidance to improve the
evidence on which decisions can be made, and to enable the impact of climate change to be
included in all flood risk management activities.
Emergency
plans
Many organisations, including local authorities, the emergency services and SEPA provide an
emergency response to flooding. Emergency plans are prepared and maintained under the Civil
Contingencies Act 2004 by Category 1 and 2 Responders and are coordinated through regional
and local resilience partnerships, often supported by voluntary organisations. They set out the
steps to be taken to maximise safety and minimise impacts during flooding. Emergency plans
may also be prepared by individuals, businesses, organisations or communities. Scottish Water
is a Category 2 responder under the Civil Contingencies Act 2004 and will support regional and
local resilience partnerships as required
GREEN Argyll and Bute benefits from a highly effective and well-established Local Resilience
Partnership, which works collaboratively to ensure strong preparedness and coordinated
responses to disruptive challenges. Its capabilities are regularly tested and proven in real
situations. We take reassurance in knowing that, regardless of the cause of any incident,
the consequences are effectively managed through this partnership and the tactical
response groups within the Council and HSCP.
Flood
forecasting
The Scottish Flood Forecasting Service is a partnership between SEPA and the Met Office. The
service continues to produce a daily, national flood guidance statement, issued to emergency
responders, local authorities, and other organisations with flood risk management duties. In
2022 a new 3-day daily Scottish Flood Forecast was launched for the public.
As the flood warning authority for Scotland SEPA continues to provide its flood warning service
issuing flood alerts and warnings when required, giving people a better chance of reducing the
impact of flooding on their home or business.
Flood warning
development
framework
SEPA published a new flood warning development framework in 2022, which details the
ambition and strategic actions to maintain and improve the flood warning service across
Scotland.
SEPA will further develop phase 1 of the Scottish Flood Forecast based on feedback gathered
during public beta release before fully launching the service to the public formally in early
2023. Phase 1 is the national 3-day flood forecast and the starting point of our journey in
providing the public with earlier and improved flood information.
SEPA will continue to follow the service design approach for phase 2 of the Scottish Flood
Forecast, which will provide the public with more localised flood forecast information. User
research will determine what information will be displayed on the regional flood forecast
webpages. It is anticipated that the final service will bring together all live information such as
flood warnings, river levels and rainfall data into a central hub that is easily accessible for the
public.
Working in close partnership with the Met Office through the Scottish Flood Forecasting
Service, SEPA will develop its capability in surface water flooding forecasting, focusing initially
on the transport sector to support climate-ready infrastructure. SEPA will also undertake a
prioritised improvement programme of existing river and coastal flood warning schemes to
provide more accurate forecasting with improved lead time.
Future flood
risk
management
planning
The years covered by the lifetime of this plan are crucial. Radical progress is needed in how we
reduce our impact on the climate and respond to the effects of climate change. How we plan
to manage flooding to our communities is on the front line of the challenges of this decade.
The 2027 flood risk management plans will be more ambitious than ever before. The plans will
look to develop long term plans for more flood resilient communities prepared for the impacts
of climate change.
The priority areas which will be the focus points of the next flood risk management plans will
be identified in 2024 with the designation of PVAs. A 3-month public consultation will be held
to inform the PVA designation.
We will plan for a better future by publishing our flooding services strategy in 2023 with a clear
and measurable delivery plan. We will put greener, fairer communities at the heart of our
ambitions. 
SEPA has set its own target to be a regenerative organisation by 2030 and the next set of plans
will further this ambition. 
During this plan cycle, SEPA will work to develop new partnerships with a wider range of
stakeholders, including businesses and commercial sectors. We will investigate alternative
sources of finance to tackle flooding and drive forward practical options for adaptation.
GREEN Argyll and Bute Council and The Highland Council reaffirms their commitment to
supporting SEPA in the development of Flood Risk Management Plans. The Councils will
work closely with communities through consultation on the preparation of Local Flood
Risk Management Plans during 2026 and 2027.
Guidance
development
The Scottish Government and SEPA have developed and updated guidance to inform flood risk
management projects. This guidance has be produced in 2022 and will look at how best to
adapt to the long-term impacts of climate change and the most appropriate methods of
assessing the benefits of flood risk management actions.
Technical guidance to support flood risk management partners will be reviewed and updated
by SEPA where required.
Scottish Forestry, in collaboration with its UK counterparts, will produce guidance on designing
and managing forests to reduce flood risk.
Guidance will be developed to help local authorities understand the requirements for mapping
relevant bodies of water and sustainable urban drainage systems in their areas.
Hazard
mapping
updates
An understanding of flooding is essential to develop a plan led risk-based approach to flood risk
management. SEPA will continue to update their national hazard mapping, which shows the
likelihood of flooding in Scotland from different flooding sources:
https://www.sepa.org.uk/environment/water/flooding/flood-maps/. SEPA will continue to
develop the hazard mapping viewer to make it easier for the public, partners and stakeholders
to access data on the likelihood of flooding. SEPA will also review how modelling and mapping
updates are undertaken to develop a more effective method of regional and national updates
for the hazard maps.
# SW Internal
General
Page 18

Page 19

Classification: OFFICIAL#
Land use
planning
Local authorities, SEPA and Scottish Water all have a responsibility under the Flood Risk
Management (Scotland) Act 2009 to support sustainable flood risk management through the
land use planning process. National planning policies set out the Scottish Ministers’ priorities
for the development and use of land. Under this approach, new development in areas with
medium to high likelihood of flooding should generally be avoided.
Current national planning policies aim to restrict development within the floodplain and limit
exposure of new receptors to flood risk, promote flood reduction via natural and structural
flood management measures and restoration of natural features, and avoid increased surface
water flooding through sustainable drainage and the minimisation of impermeable surfaces.
Locally determined planning policies place further requirements within their area of operation
to restrict inappropriate development and prevent unacceptable risk.
GREEN Argyll and Bute Council Flood Risk Management Team continue to assess minor planning
applications to ensure compliance with National Planning Framework 4 (NPF4) and to
confirm that new developments do not increase flood risk to communities or existing
infrastructure. The Team also also works closely with the Local Development Plan teams
for ABC and Loch Lomond National Park to ensure that Strategic Flood Risk Assessments
address known risks within Argyll and Bute.
Maintenance
Local authorities have a duty to assess bodies of water and to carry out clearance and repair
works where such works would substantially reduce flood risk.
Local authorities are also responsible for the drainage of roads. In addition, local authorities
may also be responsible for maintenance of any existing flood protection schemes or works.
Scottish Water will continue to undertake risk-based inspection, maintenance and repair on the
public sewer network.
Asset owners and riparian landowners are responsible for the maintenance and management
of their own assets including those which help to reduce flood risk.
GREEN Argyll and Bute Council are developing the WDM WebFRMS asset management system
for recording the assessment and clearing ofrelevant bodies of water. The system will
allow the publication of a schedule of clearance and repair works online. The WebFRMS
system is being effectively built from the ground up of the basic operating framework,
rather than implementing any existing system and is therefore expected to be
significantly more aligned with Council requirements, but take longer to finalise. 
Development of the system is progressing well during 2025 and it is expected that a full
implementation will be in place by early 2026.
Natural flood
management
mapping
SEPA will continue to support activities that improve our understanding of how to effectively
target and deliver natural flood management. As part of this, SEPA will review and update the
opportunities mapping for natural flood management. This will include linking blue-green
infrastructure with the surrounding natural catchment and coastline. Natural flood
management seeks to store or slow down flood waters through measures such as the planting
of woodlands, wetland creation, river restoration, or the creation of intertidal habitats.
In addition to flooding benefits, natural flood management measures can also provide many
additional benefits to biodiversity, water quality, recreation, and carbon storage.
National flood
risk
assessment
SEPA will use the most suitable data to review and update the national flood risk assessment
(NFRA) undertaken in 2018. This update will be used to identify future potentially vulnerable
areas and focus flood risk management planning.
National
surface water
mapping
The national flood risk assessment 2018 identified that surface water flooding has the
potential to impact more properties in Scotland than any other source of flooding. Over
the next 6 year cycle SEPA will look to vastly improve its national understanding of
surface flood risk by undertaking a wholescale update of the national surface water
maps to reflect developments in data and understanding, including the impact of
climate change
Reservoirs
SEPA will continue to develop its assessment of flood risk from dam failure and use these
assessments to direct a proportionate regulatory approach to ensure reservoir safety.  Over the
next management cycle we will implement further developments of our flood warning
capabilities in the unlikely event of reservoir failure.
Scottish Flood
Defence Asset
Database
The Scottish Flood Defence Asset Database provides information on existing flood
protection schemes. National data on flood protection infrastructure is needed to
understand flood risk and to develop adaptation planning for Scotland. SEPA will
continue to host SFDAD and look for opportunities to support the development of our
understanding of how and when Scotland’s flood defence assets should be adapted to
continue to maintain protection from flooding in the future.
GREEN Argyll and Bute Council will store asset information on all flood protection and alleviation
works in the WebFRMS asset register.  The development of this new The WebFRMS
system is being effectively built from the ground up of the basic operating framework,
rather than implementing any existing system and is therefore expected to be
significantly more aligned with Council requirements, but take longer to finalise. 
Development of the system is progressing well during 2025 and it is expected that a full
implementation will be in place by early 2026.
Self help
Everyone is responsible for protecting themselves and their property from flooding. People can
take steps to reduce damage and disruption to their homes and businesses should flooding
happen. This includes preparing a flood plan and flood kit, installing property flood resilience
measures, signing up to Floodline, engaging with their local flood group, and ensuring that
properties and businesses are insured against flood damage. The following places offer help
with taking steps to protect yourself:
https://www.floodre.co.uk/
GREEN Argyll and Bute Council continue to sign post communities and individuals to sources of
help with respect to improving property resiliance through its Flood Advice webpage,
answering public enquiries regarding flood issues and through the work of the Scottish
Flood Forum
# SW Internal
General
Page 19

Page 20

This page is intentionally left blank