Appendix 1
Roads and Infrastructure Service Review – Priority Workstream Update
Organisational Design and People
Priority
Improvement
Action
Rationale and Detail Status Progress Update
Organisational
Reshape: Develop
and implement a
revised organisation
structure for RIS
This action will deliver Stage 3 of the RIS Review
process and is fundamental to enabling the
success of all other improvement related
activities and will form the foundations for a
refreshed Roads and Infrastructure Service. The
existing organisation structure does not provide
optimal levels of clarity and accountability and in
some areas, it appears to lack the capacity
required to effectively respond to near-term
challenges. The need for change to the
Management structure is not universal with
some teams requiring only limited change.
In progress Phase 1: 
On course to be complete during September 2026. 
Phase 2:
Draft organisation structure has been completed
ready for finalisation in draft once tier 3 managers
are appointed to enable engagement with the
affected staff.
Waste Post PPP
Arrangements:
Drive forward the
section and
development, by the
Council, of the
organisational
arrangements to
come into place for
waste disposal at the
With the current PPP contract expiring in
September 2026, a key area of focus is to
increase the pace at which the organisational
arrangements that will be required after the end
of the contract are developed and put into
operation. In the short-term additional capacity
is being added to the Council’s existing waste
team through external specialist consultants. As
the future arrangements become clearer the
In Progress There has been a high level of activity over the last
3 months and this is summarised below:
• Conversion of the MBT plants: Deed of             
Variation signed 07.08.25. BIFFA have
awarded contracts with the contractors to
undertake the MBT conversion works with
mobilisation now commenced. This work is
on track to ensure bio-ban compliance by
January 2026.

Page 2

end of the current
PPP contract.
capacity of the Council’s waste team will be
further reviewed.
• Historic CLO: BIFFA have reached
commercial agreement with an off taker.
Providing required level of assurance on the
content of the material to the regulator
(SEPA) is required to finally conclude this
matter. 
• Procurement programme progressing well
for formal tender to commence in
September leading to contract award in
January 2026.
• Work has started to develop the
specification of works required for capping
and closure of the existing landfill sites both
within and out with the PPP area.
Infrastructure
Capital Programme
Management:
Improve consistency
of approach to
project
management.
While there is a strong emphasis on managing
the design and construction phases of projects,
the process of business case development and
assurance within RIS can be improved and
strengthened and brought into better alignment
with the Council wide approach of the Project
Pipeline and adoption of best practice through
the Treasury Green Book business case
approach.
In Progress Work is ongoing to align project management
within RIS with the corporate Project Pipeline
Approach. As new projects are coming through
these are adopting the refreshed corporate
approach e.g. A816 Ardfern project being
considered by Committee at this meeting.
Respond to
Reduced Roads
Asset Maintenance
Budget: Review the
impact of the
reduction in roads
maintenance capital
This action was initially developed in response to
the anticipated significant reduction in the level
of capital funding for 2025/26. The decision at
Council to award a capital budget of £10m for
roads reconstruction in 2025/26 has reduced the
urgency of this action. However, with ongoing
pressure to Council budgets and no guarantee
Timeframe
to be
aligned with
timetable
for wider
Council
Savings and
This is not being progressed at the current time
until a clearer indication of likely future capital
maintenance budget is available.

Page 3

budget on the overall
staffing structure -
with particular
emphasis on the
impact of front-line
operational staffing
(due to existing
approach to capital
recharging of a
proportion of
operative staff time).
that the current level of capital funding can be
maintained in future years, it remains necessary
for the service to review how a potential future
reduction in the capital budget would impact on
the current operating model and balance
between activities delivered by in-house
resource and those delivered by contractors.
Budgets
options
process
Helensburgh Waste
Transfer Station
(WTS) Project: 
subject to project
gateway review to re-
baseline the benefits
in the context of
whether it can offer
opportunities to
increase efficiency in
waste collection and
resilience in waste
disposal of sufficient
magnitude to justify
the required capital
investment.
The proposed Helensburgh WTS is no longer
required to ensure the Council has a bio-ban
compliant disposal solution in this area. The
project does however offer benefits in terms of
resilience of waste disposal by enabling the
Council to bulk waste and therefore being at less
risk if it has to take waste further than at present
for disposal. Construction of the WTS may also
enable revised and lower cost shift patterns to be
adopted by the waste collection teams. However
it is not clear that these efficiency and resilience
gains are sufficient to justify £3.6m of capital
investment.
Complete Following agreement of the Environment,
Development and Infrastructure Committee on
20th March 2025 that officers should not progress
further with the development and delivery of the
Helensburgh WTS and the subsequent agreement
of the Policy & Resources Committee on 8th May
2025 that the remainder of the £3m of budget
earmarked for this project could be retained for
other funding related pressures within the Waste
Service, this Priority Improvement Action has now
been concluded.

Page 4

Roads and Infrastructure Service Review – Priority Improvement Workstream
Data, Digital and Customer
Priority
Improvement
Action
Rationale and Detail Status Progress Update
RIAMS
Improvement:
Establish cross
service project team
with involvement
from corporate,
digital and finance to
fundamentally
review WDM and
Total systems to
determine and drive
forward a plan to
either re- configure it
replace both
(recognising existing
Total product must
be replaced due to
product soon to
become
unsupported).
Stage 1 and 2 of the review process identified
that the core asset and information
management system used by the service in
relation to roads, amenities and environmental
assets is not optimally configured and is not
offering the maximum value possible. This
system also interacts with a service specific
finance system which is coming to its end of life
and with the corporate customer relationship
management system. This Priority Improvement
Action will see these systems reviewed with
targeted improvements made to maximise
benefit and ensure a replacement for the finance
element is in place prior to the expiry of the
existing product.
This work will include reviewing the
opportunities for artificial intelligence to add
greater value and enable staff to spend a greater
proportion of their time on higher value-added
activities.
In Progress Finance Module:
As set out in the June update the highest
priority of this project has been to secure
the replacement of an existing tool that is
essential to the process of budgeting for
road maintenance works, with the existing
tool becoming unsupported in March next
year. An alternative product has been
sourced, and work has now commenced to
undertake the necessary development to
ensure this is available and functioning by
March 2026. The key outcomes of this work
will be improved back-office efficiency,
implementation of the digital systems
needed for future service improvements,
sustainability of the existing systems and
improvements in customer service. 
CRM:
Work has been underway on making some
improvements to WDM aimed at enhancing
the customer experience and improving
efficiencies for our inspectors. A key
improvement is that faults can no longer be

Page 5

logged on non-adopted roads and trunk
roads as of Monday 7th July. 
ELM:
This work has progressed at the pace
anticipated due to staff prioritising other
activities. A review of the plan for this work
will be undertaken shortly.

Page 6

Roads and Infrastructure Service Review – Priority Workstreams
Policy and Procedure
Priority Improvement
Action
Rationale and Detail Status Progress Update
Commence program
of strategic change to
parking and
enforcement related
activity.
A strategic review of parking services and
options for change should be developed for
consideration by Members as a coordinated
package of service changes.
Not yet
commenced
Resource availability and other parking
related priorities such as pavement parking
ban and events TTRO review has meant that
progress has not begun with priority action.
Implement a Package
of changes to school
transport including
ASN transport.
Significant financial strain for a number of
years as a result of increases in demand. A
package of changes will be developed
including:
• Reviewing the approach to
procurement in targeted areas.
• Strengthening co-ordination between
council services in Education and RIS
in relation to planning for the transport
requirements of children and young
with ASN.
In Progress Work has begun to improve the co-ordination
of decision making and information sharing
between education officer and the RIS
transportation team. A key staff resource gap
within RIS has held up progress in this area.
Household Residual
Waste Collection
Reduction
This project has been triggered as part of the
RIS Review. This project brings together two
existing related but separate projects into a
single project. In doing so this project
subsumes its predecessors and provides a
greater level of aspiration for the outcomes
and benefits of the project.
The existing projects replaced by this project
are:
In Progress A report is being considered by EDI
committee today setting out progress and
recommendations in relation to this priority
improvement action. The report includes:
• A new second domestic waste bin
policy,
• A new assisted bin uplift policy,

Page 7

1)Second Domestic Bin Review
2)Waste Service Route Optimisation Project
• A review and re-positioning of the
route optimisation project,
• Requests members endorse a
programme to require and enforce
mandatory identification of household
bins.

Page 8

Roads and Infrastructure Services Review – Priority Workstreams
Commercial Opportunities
Priority Improvement
Action
Rationale and Detail Status Progress Update
Further review the
options for increased
commercial activity in
the fleet maintenance
workshops.
Stage 1 of the review reached conclusions in
relation to the potential to generate
additional income through fleet services. The
Stage 2 due diligence did not fully support the
conclusion as they did not take account of
the local context of Argyll and Bute including
our highly rural nature, topography and long
distances between vehicle operating centres
(depots). However, opportunities are believed
to exist to further review medium to long term
options to increase efficiency and / or
generate additional commercial income. 
A further and more detailed review of
capacity that involves looking at both existing
capacity available for commercial work will
be progressed.
Not yet
commenced
Resourcing challenges within the fleet and
transport team have resulted in challenges in
progressing this workstream.
Progress the initial
review of commercial
waste income to
ensure that all
commercial waste
services are charged
for the service of
The initial work suggests a very significant
amount of income is not being collected. The
data also suggests significant disparities with
some businesses paying appropriately while
others are not and are in effect in receipt of a
service free of charge.
In Progress This has been another significant area of
activity over the last 3-months. In June the
first of two projects intended to ensure the
Council recovers all legitimate income from
the collection of commercial waste was just
beginning. That project has now led to
additional contracts being entered into
resulting in a projected increase in income of

Page 9

which they are in
receipt.
over £270k. Since then, a second project has
been mobilised which involves contacting all
properties across Argyll and Bute paying non-
domestic rates to determine if they require a
contract for commercial waste. This is a
significant task which due to resource
constraints is being progressed on a
progressive basis i.e. not all properties can be
contacted at the same time. To date
indications, suggest an increase in income of
over £500k should be anticipated in the
current financial year. Over the next period
further work will be undertaken, as a priority,
to assess further activities that might further
improve the Councils financial return on this
commercial service. The key outcomes of this
work are to increase the income of the
Council, thereby contributing to financial
sustainability in the long term and to ensure
that all customers receive an equitable
service.