ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
ROADS AND INFRASTRUCTURE SERVICES                     18 DECEMBER 2025 
SPEED LIMIT REVIEW 
1.0 EXECUTIVE SUMMARY
1.1 A report was presented to the EDI Committee at its meeting held on 18
December 2024, on the proposed review of speed limits on the local road
network.  Following that, Roads and Infrastructure Service (RIS) attempted to
secure an external resource. Following an unsuccessful recruitment exercise at
the end of 2024, the service has now seconded an internal officer to the Project
Officer post. This has been agreed with Transport Scotland. 
1.2 This report provides the Committee with an update and overview of the speed
limit review on the local road network (“Project 20”) and the associated process
Transport Scotland have adopted for the trunk road network. 
1.3 It also distinguishes between the council’s Project 20, and the pilot schemes
currently being implemented by Transport Scotland on the trunk roads in Argyll
and Bute, as follows 
• A83 at Ardrishaig
• A83 at Arrochar
• A83 at Campbeltown
• A85 at Connel
• A83 at Inverary
• A83 at Lochgilphead
• A83 at Tarbert
• A82 at Tarbet 
1.4 The report is for consideration by the Committee.

Page 2

ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
ROADS AND INFRASTRUCTURE SERVICES                     18 DECEMBER 2025 
SPEED LIMIT REVIEW   
2.0 INTRODUCTION
2.1  This report provides the Committee with an update and overview of the speed
limit review, and the process Transport Scotland have adopted for the trunk road
network.
3.0 RECOMMENDATIONS
3.1 The Environment, Development and Infrastructure Committee are requested to
consider the report.
4.0 DETAIL
4.1    A report was presented to the Committee at its meeting held on 18 December
2024, on the proposed review of speed limits on the local road network.  Following
that meeting, the Service attempted to secure external resource but was this
unsuccessful.  The Service, with agreement from Transport Scotland as the
funder, has now seconded an internal officer to the Project Officer post.
4.2  This report provides the Committee with an update on the Project 20 (this is the
project name for the local road speed limit review) project, process for appraisal,
and the approach that Transport Scotland have adopted for the trunk road
network in Argyll and Bute.
4.3 The starting point of Project 20 is to assess our existing road network and identify
roads which are appropriate for a lower speed limit of 20mph.  This is based on
Scotland’s Road Safety Framework to 2030 (RSF2030) which supports this
commitment. It promotes a strong and strategic approach to creating a safe
system, with speed management being a priority. The strategy's vision is: “slower
today for a safer tomorrow” and it should be noted that even small reductions in
speed reduce the risk of fatal and serious collisions. The speed of a vehicle
directly influences the risk of a collision as well as the severity of injuries
sustained, and the likelihood of death resulting from that collision.

Page 3

4.4  The initial view taken is that all 30 mph roads are appropriate for a lower speed
limit of 20 mph. However, officers acknowledge that there will be some
inconsistencies, for example
• where some roads meet the place criteria but are not appropriate, or
• where other roads which do not meet the place criteria are appropriate for a
lower speed limit of 20mph. 
4.5  The Argyll and Bute project acknowledges that local knowledge and community
feedback is key to setting the most appropriate speed limit for our local
environment. 
4.6  A webpage has been set up on the Councils website which provides additional
information and FAQs but will also provide updates to the public as the project
progresses.
4.7  Local engagement will include meetings with local Elected Members and
Community Councils.  This may be expanded to include other groups as
appropriate, for example, a local disability forum.
4.8 The project will work area by area, beginning with Helensburgh and Lomond, on
the local road network. More information about this initiative, and updates on its
progress as it develops, will be made available at: www.argyll-bute.gov.uk/project-
20
4.9 The project is being operated independently of the 18 month trial recently
introduced by Transport Scotland at the following locations within Argyll and Bute
• A83 at Ardrishaig
• A83 at Arrochar
• A83 at Campbeltown
• A85 at Connel
• A83 at Inverary
• A83 at Lochgilphead
• A83 at Tarbert
• A82 at Tarbet 
4.10 While Argyll and Bute Council was not directly involved in this, and had limited
input into the selection of locations, we welcome efforts to improve road safety
across the region. As works progress, Transport Scotland will install signage on
trunk road locations, where changes to the speed limit have been considered
appropriate, to inform road users of these changes.

Page 4

4.11 Trunk road speed limits are the responsibility of the Scottish Government
through Transport Scotland. Similar to our own process, changes to the existing
trunk road speed limits have been introduced under a Temporary Traffic
Regulation Order (TTRO) for the maximum permitted duration of 18 months.
During this time, evaluation of the effectiveness of the lower speed limit will be
carried out.  This evaluation will include consultation with organisations such as
Police Scotland. The evaluation consists of carrying out speed surveys prior to
the implementation of any 20mph speed limit to establish a baseline value that
measurements can be made against before being promoted as a permanent
order. Feedback on the 20mph speed limit can be made when the draft
Permanent Traffic Regulation Order (PTRO) is published at the end of the 18-
month trial period. Any move to make these changes permanent will require the
Scottish Government to put in place a Permanent Traffic Regulation Order,
which will include consultation with the local community.
4.12 With regards to the council’s own project, Temporary Traffic Regulation Orders
(TTROs) will be promoted, introducing the amended speed limits.  This has
been preceded by engagement and pre-implementation surveys This process
will use TTROs to implement the 20 mph speed limits, giving the community
time to experience the change and for the lower speed limit to be monitored and
evaluated over a maximum period of 18 months. During this period, a measured
and informed decision can then be made as to whether the 20 mph speed limit
can be refined or modified and implemented via a permanent Traffic Regulation
Order (TRO).
4.13 Argyll and Bute roads officers have opted to engage prior to implementation to
maximise the incorporation of local knowledge and to potentially minimise
objections at the formal TRO process.  This makes any amendments slower to
introduce but, based on experience with other TROs, is expected to result in
fewer changes when moving from the TTROs to TROs at the last stage of the
project.  There is likely no “right” way to implementation and each roads authority
will manage their project as they consider best. 
5.0 CONCLUSION
5.1 The report provides an update on Project 20 and the associated process on the
trunk road network for noting by the Committee.

Page 5

6.0 IMPLICATIONS
6.1 Policy – The assessment criteria for the project (criteria has been agreed
nationally) may require the existing Road Speed Limit Policy Framework to take
this into account on review.
6.2 Financial – The project post is funded by the Scottish Government.  Where a
requirement for lining, signing or physical traffic management has been
identified, further requests for funding will be submitted to the Scottish
Government. 
6.3  Legal – TTROs & TROs will be progressed in accordance with the Road Traffic
Regulation Act 1984, The Local Authorities' Traffic Orders (Procedure)
(Scotland) Regulations 1999, The Road Traffic (Temporary Restrictions)
Procedure Regulations 1992 and other associated regulations.  
6.4  HR – none at this time 
6.5 Customer service – webpage will be updated as the project progresses.  The
Project 20 Officer is in the process of engaging with our Customers Services
team to formalise the best way to ensure we maximise service delivery. 
6.6  Risk – reputational damage is possible if the project was not taken forward. 
Public opinion on speed limit reductions is not homogenous, potential for
criticism regardless of final output. 
6.7  Climate change – reductions in mean speeds may have a beneficial impact on
outputs from engines (NO, CO2, particulates).  Could encourage more people
to walk or wheel, reducing vehicular traffic, which potentially lowers both
engine outputs and noise in the environment close to the road network. 
6.8  Fairer Scotland Duty – n/a 
6.9  Equalities: protected characteristics – Reduction in mean speeds would have
a beneficial of those with disabilities when using the road network, particularly
for those walking or wheeling, 
6.10  Consumer duty – n/a 
6.11  Island communities – n/a 
6.12 Children’s Rights and Wellbeing – Reduction in mean speeds and a move to
20mph speed limits will make the road network for children.  Slower speeds
make crossing the road easier but, more importantly, massively reduces both
the frequency of incidents and the severity of outcome when they do occur. 
Executive Director with responsibility for Roads and Infrastructure Services:
Kirsty Flanagan

Page 6

Policy Lead for Roads, Transport and Amenity Services: Councillor John Armour
November 2025                                          