Democracy Spraffa

Appendix 3 – SEPA, Checklist for Groundwater management compliance

Argyll and Bute Council · 18 December 2025
Back to Environment, Development and Infrastructure Committee — 18 December 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

UNCONTROLLED DOCUMENT WHEN PRINTED OUT 
Appendix -3  
EDI – Dec 2025 
SCOTTISH ENVIRONMENT PROTECTION AGENCY Identifier: LUPS GU32
Land Use Planning System
SEPA Guidance Note
Page no: 7 of 11
Issue No: Version 4
Issue date: 05/07/2017
Guidance on Assessing the Impacts of Cemeteries on
Groundwater 
ANNEX 1: SITE SUITABILITY CHECKLIST 
Site Name: 
NGR of centre of site: 
PCS No:
[to be completed by SEPA] 
Area of site (hectares) 
Burial rate (per year) Varies     1 – 70  p.a.   per site 
Maximum depth of burial
and method of body
containment (m) 
1.6m  - Traditional coffin interments
Author: 
Date: 
Criteria 
Stage 1 Assessment
Y/N Details Location in
report where
more details
can be found
1. Will burials be within 250m
of potable groundwater
abstractions; namely any
spring, well or boreholes
used as a source of
drinking water?   
2. Will burials be within 50m of
any other springs, wells or
boreholes?   
3. Will burials be within 50m of
any watercourse (loch,
wetland, burns etc)?   
4. Will burials be within 10m
of any field drain?

Page 2

UNCONTROLLED DOCUMENT WHEN PRINTED OUT 
SCOTTISH ENVIRONMENT PROTECTION AGENCY Identifier: LUPS GU32
Land Use Planning System
SEPA Guidance Note
Page no: 8 of 11
Issue No: Version 4
Issue date: 05/07/2017
Guidance on Assessing the Impacts of Cemeteries on
Groundwater 
5. Will any burials be within
an area of known or
probable shallow mine
workings?   
6. Is the development located
within an area designated
as Contaminated Land?   
7. Is the development located
on land prone to flooding?   
Stage 2 Assessment 
8. Is there any rock
outcropping at surface or
exposed in investigations
to at least 1m below the
planned base of the lairs?   
9. Is the soil exposed by the
investigations “coarse
SAND”, “GRAVEL” or
coarser?    
10. Is there >1m between the
planned base of the lairs
and the annual maximum
water table?   
Stage 3 Assessment (if required):
Please provide a summary of the results of the more detailed
assessment of ground conditions and/or of changes to the
design of the cemetery to minimise pollutant loading
Location in
report where
more details
can be found