ANNUAL STATUS AND OPTIONS REPORT  2025-26 Appendix 2
PHOTOGRAPHIC RECORDS. -  Related to 2024-25 works programme and effect on RCI
Mid-Argyll - A819 Electric Cottage - Widening Ph 3 and Ph 4
PH3 April – June 2024
Reduction in vertical alignment and widening to 2 lanes 6.5 m minimum
PH4 October – November 2024

Page 2

Construction of widened carriageway section and filter drainage, linked to existing culverts
Widened North Bound lane and drainage                  Enhanced Southbound embankment

Page 3

Kintyre – B8001 – Auchmeanach Farm “Claonaig Slip stabilisation” - 2024
Lorn - A816 Blaran Widening PH 4    August 2024
Embankment widening, carriageway construction and culvert extensions

Page 4

Islands  - road surfacing improvements  2024-25 Programme
Isle of Coll
Isle of Colonsay
Isle of Bute
A844 Stewarthall – Milton      UC 1  Bogany  - Asgog

Page 5

ISLAY – PARTNERSHIP WORKING Ardnhoe Distillery access, with Bunnahabhain.
Combined funding to allow full upgrade of whole route from A846 - September 2024
In-Situ recycling of existing carriageway structure and final surface treatment.
COWAL – A8003 – PHASE 8 Widening – single track section to 2 lane – 6.2m wide.
Ardnahoe
Distillery
Planning
condition
Bunnahabhainn
Biomass deliveries
A&BC
Capital
Scheme

Page 6

Street Lighting – System upgrades to mitigate recurring faults.- Deferred 2023 scheme
Nant Drive – Oban, Street Lighting duct, cable and column replacement. – 2024-25
Footways -  Transport Scotland additional funding.- (Safety Improvements Project)
Cruachan Cottages – Taynuilt  -  Linking footpath, verge improvement – T.S. Safety fund
Millpark Road – Oban – Linking footpaths and on-street parking improvements T.S. Safety fund.

Page 7

Gibraltar Street – Oban  -  Public Realm  -  Scottish Gov additional finding.
Ph 1- 2023 Street Lighting and Surface improvements, Ph 2 - 2024 Street Furniture installation

Page 8

STORM EOWYN  -  January 2025 -   INITIAL MOBILISATION Feb-Mar 2025
Ormsary
Ellary