ASOR - Appendix 2
Argyll and Bute Council · 18 December 2025
Back to Environment, Development and Infrastructure Committee — 18 December 2025 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
ANNUAL STATUS AND OPTIONS REPORT 2025-26 Appendix 2 PHOTOGRAPHIC RECORDS. - Related to 2024-25 works programme and effect on RCI Mid-Argyll - A819 Electric Cottage - Widening Ph 3 and Ph 4 PH3 April – June 2024 Reduction in vertical alignment and widening to 2 lanes 6.5 m minimum PH4 October – November 2024
Page 2
Construction of widened carriageway section and filter drainage, linked to existing culverts Widened North Bound lane and drainage Enhanced Southbound embankment
Page 3
Kintyre – B8001 – Auchmeanach Farm “Claonaig Slip stabilisation” - 2024 Lorn - A816 Blaran Widening PH 4 August 2024 Embankment widening, carriageway construction and culvert extensions
Page 4
Islands - road surfacing improvements 2024-25 Programme Isle of Coll Isle of Colonsay Isle of Bute A844 Stewarthall – Milton UC 1 Bogany - Asgog
Page 5
ISLAY – PARTNERSHIP WORKING Ardnhoe Distillery access, with Bunnahabhain. Combined funding to allow full upgrade of whole route from A846 - September 2024 In-Situ recycling of existing carriageway structure and final surface treatment. COWAL – A8003 – PHASE 8 Widening – single track section to 2 lane – 6.2m wide. Ardnahoe Distillery Planning condition Bunnahabhainn Biomass deliveries A&BC Capital Scheme
Page 6
Street Lighting – System upgrades to mitigate recurring faults.- Deferred 2023 scheme Nant Drive – Oban, Street Lighting duct, cable and column replacement. – 2024-25 Footways - Transport Scotland additional funding.- (Safety Improvements Project) Cruachan Cottages – Taynuilt - Linking footpath, verge improvement – T.S. Safety fund Millpark Road – Oban – Linking footpaths and on-street parking improvements T.S. Safety fund.
Page 7
Gibraltar Street – Oban - Public Realm - Scottish Gov additional finding. Ph 1- 2023 Street Lighting and Surface improvements, Ph 2 - 2024 Street Furniture installation
Page 8
STORM EOWYN - January 2025 - INITIAL MOBILISATION Feb-Mar 2025 Ormsary Ellary