ANNUAL STATUS AND
OPTIONS REPORT   
December 2025

Page 2

2 
Contents 
Carriageways ............................................................................................................................................... 4
1.1 Road Length ....................................................................................................................................... 4
1.2 Condition ............................................................................................................................................. 4
1.3 Asset Valuation ................................................................................................................................... 5
1.4 Investment .......................................................................................................................................... 5
1.5 Maintenance Backlog .......................................................................................................................... 6
1.6 Winter Maintenance ............................................................................................................................ 7
1.7 Revenue Funded Preventative Maintenance Investment Options ....................................................... 8
1.8 Capital Resurfacing Investment Options ............................................................................................. 9
2.0 Footways ................................................................................................................................................ 9
2.1 Length ................................................................................................................................................. 9
2.2 Condition ............................................................................................................................................. 9
2.3 Asset Valuation ................................................................................................................................. 10
2.6 Investment Options ........................................................................................................................... 11
3.0 Street lighting ........................................................................................................................................ 12
3.1 Inventory ........................................................................................................................................... 12
3.2 Condition ........................................................................................................................................... 12
3.3 Valuation ........................................................................................................................................... 13
3.4 Investment ........................................................................................................................................ 13
3.5 Energy Consumption ......................................................................................................................... 14
3.6 Investment Options ........................................................................................................................... 15
4.0 Structures ......................................................................................................................................... 16
4.1 Assets ............................................................................................................................................... 16
4.2 Condition ........................................................................................................................................... 16
4.3 Asset Valuation ................................................................................................................................. 17
4.4 Investment ........................................................................................................................................ 19
4.5 Maintenance backlog ........................................................................................................................ 19
4.6 Flood Risk Management ................................................................................................................... 20
4.7 Match Funding Opportunities ............................................................................................................ 20
4.8 Investment Options ........................................................................................................................... 20
5.0 Traffic Signals ....................................................................................................................................... 22
5.1 Inventory ........................................................................................................................................... 22
5.2 Valuation ........................................................................................................................................... 22
5.3 Investment ........................................................................................................................................ 22
5.4 Investment Options ........................................................................................................................... 23
6.0 Street Furniture ..................................................................................................................................... 24
6.1 Assets ............................................................................................................................................... 24
6.2 Condition ........................................................................................................................................... 24

Page 3

3 
6.3 Valuation ........................................................................................................................................... 25
6.4 Investment ........................................................................................................................................ 25
6.5 Investment Options ........................................................................................................................... 26
7. Road Operations Projects ................................................................................................................... 26

Page 4

4 
Carriageways 
1.1 Road Length 
ALL ROUTES (Kms) MAINLAND ISLAND
Road Class Urban Rural Total Urban Rural Total Urban Rural Total
A 82.54 422.75 505.29 58.765 206.345 265.11 61.671 178.509 240.18
B 43.73 569.78 613.51 34.322 350.047 384.369 104.63 124.509 229.139
C 41.72 392.55 434.27 35.934 251.103 287.037 33.133 114.095 147.228
Unclassified 280.42 455.21 735.36 240.162 243.628 483.788 120.74 130.832 251.572
Totals (Km) 446.1 1840.29 2288.43 366.869 1051.123 1420.304 320.174 547.945 868.119 
1.2 Condition 
Road condition is measured by the Scottish Road Maintenance Condition Survey (SRMCS) which
assesses parameters such as surface texture and cracking, smoothness and rutting. This provides an
indication of the residual life of the road structure. The table below shows the current condition based on a
two-year average 2023-25. 
2023-25 Overall, Road Condition % by Class   Road Condition Index (Red% +
Amber%)  Road Class % RED % AMBER % GREEN
A 7.85 30.94 61.21 38.79
B 17.02 40.99 41.99 58.01
C 12.55 40.37 47.07 52.92
U 16.81 34.82 48.36 51.63
Urban 3.44 27.09 69.47 30.53
Rural 16.66 39.00 44.34 55.66
All 14.09 36.68 49.25 50.77 
The current 2023-2025 RCI value shows a slight deterioration in the network overall, with a value of
50.77%. This is based on the revised 2-year average value for the completed survey works. Due to delays
and disruption to the survey programme 2022 and 2023, through a combination of weather conditions
affecting carriageway surfaces and logistical difficulties regards ferry and accommodation bookings, the
survey provider was not able to complete a substantial section of the island network survey.

Page 5

5 
1.3 Asset Valuation 
Carriageways Valuation (These values include the regional and inflation factors for the current year)
Road Classification Gross Replacement
Cost
Depreciated
Replacement Cost
Annualised
Depreciation Cost
Principal (A) Roads (Urban) £243,477,338 £214,194,416 £2,656,047
Principal (A) Roads (Rural) £528,709,818 £469,270,109 £5,072,513
Classified (B) Roads (Urban) £231,543,236 £204,135,316 £2,529,339
Classified (B) Roads (Rural) £382,314,340 £330,259,111 £4,083,724
Classified (C) Roads (Urban) £91,122,828 £78,231,724 £1,122,234
Classified (C) Roads (Rural) £245,600,490 £202,896,000 £3,238,132
Unclassified Roads (Urban) £421,683,747 £347,832,111 £6,464,604
Unclassified Roads (Rural) £200,882,470 £160,211,326 £2,912,363
Total £2,345,334,267 £2,007,030,113 £28,078,956 
1.4 Investment   
The capital reconstruction budget for 2024-
25 was £8M. The table details the surfacing
quantities and value within each activity.
The percentage split across activities shows
the bulk of investment (73.91%) is attributed
to Surface Dressing (SD) and thin surfacing
works to maximise network coverage. The
aim being to seal and extend surface life
with a SD treatment and tackle as much
deteriorated surface as possible with thin
surfacing works to help reduce demand for
reactive treatment works.  
Argyll and Bute Council, applies annually for
STTS funding from the Scottish
Government. We received £387,344 for
2023-24 in STTS funding.
Unfortunately, we were unsuccessful in
2024-25 funding bid but were successful in
the 2025-26 financial year in securing a
further £151k for STTS funding contribution
towards the A819 Electric Cottage Phase 5. 
Surface Treatment Length (m) Cost (£) Network
Percentage
Surface Dressing 47,465 £1,446,601.29 2.07%
Thin/Micro Surfacing
(up to 25mm)
0 £0 0%
Thin Overlay
(>25mm to 60mm)
21,209 £2,567,210.41 0.93%
Moderate Overlay
(>60mm to 100mm)
2,722 £382,466.29 0.12%
Structural Overlay
(>100mm)
681 £314,075.19 0.03%
Thin Inlay    
(>25mm to 60mm)
7,643 £1,406,466.02 0.33%
Moderate Inlay
(>60mm to 100mm)
2,981 £828,745.63 0.13%
Structural Inlay
(>100mm)
0 0 0%
Planned Patching 0 0 0%
Reconstruction
(250mm+) 1,045 £388,497.55 0.05%  
Total 83,656 £7,334,062.38 3.66%

Page 6

6 
We are currently working in year 2025/26 with a £10M Capital Budget, of which £2M funding has been
allocated to cover the Storm Eowyn Works. Going forward officers expect weather events to increase and
as such place a requirement for funding to cover damage caused by these events. The current years
contingency funding of ~£1M is still largely intact as Storm Amy in October was less destructive. 
HISTORICAL INVESTMENT   2020-25 – With projected Capital block Allocation 2026-28. 
1.5 Maintenance Backlog 
The SCOTS Headline Maintenance Backlog figure is calculated every two years using road condition data
collected via the Scottish Road Maintenance Condition Survey (SRMCS). The calculation uses surveyed
condition data with a surfacing treatment matrix and national average unit rates to determine the extent of
surfacing maintenance required to bring whole network surface to an ‘A1’ condition with no defects. 
As can be seen in the above table, SCOTS modelling, which is used across all 32 Scottish Councils
calculates that to restore our road surfaces to A1 condition, we will require £122,548,000 investment. The
steady state value to keep road surfaces in current condition is between £11M to £14M annually. This
increase in costs was associated to material, vehicles and staff cost increases; also, petrochemical costs
have seen a dramatic increase in the last 4 years. The steady state was previously £8M which shows a
potential increase of over 27%. We manage our roads and improve them with various methods; however,
we do not seek to manage our road surfaces to A1 condition as this would use large amounts of our budget
for only a few schemes. Instead, officers manage the works to provide best value such as surface dressing
preparation and works to treat the road surface condition to maximise the lifespan of the road. 
SCOTS Headline Maintenance Backlog   2024 SCOTS Report 
Headline Backlog Figure  Steady State Figure 
£122,548,000  Between £11M to £14M

Page 7

7 
1.6 Winter Maintenance 
Table below identifies the last 10 years of road and winter maintenance revenue budget. The 2nd and 3rd
Columns identify the budget allocated for Roads and Winter and the last column identifies the percentage
of that budget year on year.  Therefore, we are effectively allocating more on winter each year with a
reduction in Road Maintenance Activities Budget. 
Table below shows outturn actual revenue spend on Roads and winter maintenance for the last 10 years.
The proportion of spend on winter within the total revenue outturn shows a fluctuation due to unplanned
weather events. This demonstrates that generally the trend is for outturns to be above the budget allocation
for winter maintenance. 
Spend Roads Winter Total Winter %
2015-16 £4,173,702 £1,832,248 £6,005,950 30.51%
2016-17 £4,243,332 £1,885,851 £6,129,183 30.77%
2017-18 £3,926,258 £2,669,341 £6,595,599 40.47%
2018-19 £3,765,604 £1,791,150 £5,556,754 32.23%
2019-20 £3,485,315 £2,165,845 £5,651,160 38.33%
2020-21 £3,360,100 £2,251,432 £5,611,532 40.12%
2021-22 £3,516,984 £2,355,154 £5,872,138 40.10%
2022-23 £3,746,846 £2,661,350 £6,408,196 41.54%
2023-24 £3,784,751 £2,663,324 £6,448,075 41.30%
2024-25 £3,537,086 £2,889,542 £6,426,628 44.96% 
Budgets Roads Winter Total Winter %
2015-16 £3,957,298 £1,644,490 £5,601,788 29.36%
2016-17 £3,972,055 £1,836,286 £5,808,341 31.61%
2017-18 £3,832,056 £1,636,828 £5,468,884 29.93%
2018-19 £3,832,056 £1,621,674 £5,453,730 29.74%
2019-20 £3,411,055 £2,122,154 £5,533,209 38.35%
2020-21 £3,506,058 £2,122,618 £5,628,676 37.71%
2021-22 £3,422,540 £2,119,974 £5,542,514 38.25%
2022-23 £3,542,940 £2,108,942 £5,651,882 37.31%
2023-24 £3,670,665 £2,304,942 £5,975,607 38.57%
2024-25 £3,702,435 £2,669,718 £6,372,153 41.90%
Winter Treatment Information Winter 2024-25 Average
Stats since 2009-10
Total number of planned treatment runs (equal Full Fleet) 81 78 Runs
Total aggregate annual treatment mileage travelled by all
gritting vehicles on all planned routes
132,037 93,440 Miles
Total tonnage of salt used on carriageways 11,755 14,309 Tonnes
Total Winter actual spend carriageways £2,889,542 £2,362,485 Spend

Page 8

8 
1.7 Revenue Funded Preventative Maintenance Investment Options 
The value of undertaking adequate preventative maintenance works cannot be overstated. It is the most vital and
fundamental function required to extend infrastructure service life, strengthen network resilience, and minimise
demand for capital investment. 
Below are several initial revenue budget investment options for consideration. These will all require further
investigation, research, and development to progress more detailed information on which option is best suited to
support council objectives within the confines of available resources.   
Option 1 Reduced investment level, increased pressure on council budgets and the need to realise savings may reduce
current investment levels for preventative maintenance activities. This needs careful consideration and will impact the quantity of
works afforded necessary to provide adequate protection to vital road assets. It will increase demand for more expensive reactive
works which is the vicious cycle essential maintenance activities are currently experiencing. It will increase future demand for
capital investment far greater than initial savings realised.
BENEFITS DRAWBACKS CONSIDERATIONS
Delivers short term budget
savings
Less Maintenance works afforded Doesn`t support corporate objectives
Increased asset deterioration Difficult to demonstrate value
Greater demand for expensive reactive
maintenance works
Future demand for capital investment far greater
than initial savings realised.  
Highly likely to compromise internal service
delivery   
Option 2 Maintain existing investment levels and consider prioritising activity funding using a risk-based approach. Prioritised
activities should be delivered through a planned programme of works to maximise value for money through appropriate service
standards. Combined with improved recording of maintenance works, asset information can be enhanced to assist driving an
improved asset management approach that can break the current vicious cycle of reactive maintenance demands.
BENEFITS DRAWBACKS CONSIDERATIONS
Maintains existing budget No Council budget saving Supports some corporate goals
Retains internal service
delivery Requires change in approach Training to focus efforts on prioritised business
needs
Increased focus on planned
works Needs commitment to deliver Some investment in better mobile technology
Better data capture and
analysis   Development of appropriate service standards
Better value works can be
afforded  
Additional resources needed to implement any
changes   
Option 3   Maintain or increase investment levels through a zero-based budget approach. This would essentially allocate a
percentage budget for reactive maintenance with the balance of funding allocated through planned schedules and programmes of
works to effectively justify and approve funding allocation against a measured works quantity to meet appropriate service
standards. This would refocus effort on delivering measured work packages whilst improving capture of asset information to assist
delivery of the benefits of implementing recognised asset management practices.
BENEFITS DRAWBACKS CONSIDERATIONS
Better control of costs No Council budget savings Supports Council objectives
Delivers better value
maintenance services Potential increased budget required
Implementing SCOTS Asset Management
recommended practices  
Requires significant changes Investment in better mobile technology
More informed decision
making Needs commitment to deliver Staff training & additional resources to implement    
Option 4 Consider funding some maintenance activities using capital funding allocation. Preventative maintenance is a critical
activity some of which can be easily quantified (Ditching, Gully cleaning, Patching Etc.) Delivering planned measurable works
would greatly enhance ability to demonstrate value and prudent stewardship of assets.
BENEFITS DRAWBACKS CONSIDERATIONS
Vital maintenance activities
delivered
May impact capital investment on other
assets Supports council objectives
Ability to demonstrate value  Implementing SCOTS Asset Management
recommended practices
Improved asset management   Investment in better mobile technology    
Staff training & Additional resources to implement

Page 9

9 
1.8 Capital Resurfacing Investment Options
The SCOTS cost projection modelling tool enables an indicative illustration of predicted road surface
condition in terms of RCI to be developed for a range of investment options over a 20yr term. This allows
comparisons between various levels of investment. Options 1- 4 are illustrated in the table and chart below
for £2m, £3.5m, £5m and £8m respectively. 
Option 1 - £2m annual investment shows Significant deterioration of network RCI 
Option 2 - £3.5m annual investment shows Considerable Deterioration of network RCI
Option 3 - £5m annual investment shows Deterioration of network RCI 
Option 4 - £8m annual investment shows Slight Deterioration of network RCI 
2.0 Footways 
2.1 Length 
Footways/Footpaths Cycleways Quantities by Hierarchy
Footway Hierarchy Length (m) Area (sqm)
Higher Amenity Footways 41,977 117,536
Other Footways 470,174 1,001,471
Total 512,151 1,119,006
All Footpaths 9,349 11,219
Total 9,349 11,219
Cycle Lanes * 0 0 
*Cycle Lanes are not listed if contiguous with the road, therefore we have zero independent cycle lanes
in ABC. 
2.2 Condition 
Asset condition surveys are not currently undertaken due to limited resources and cost implications.   
All Roads RCI 
Year £2M £3.5M £5M £8M
2023/25 50.77% 50.77% 50.77% 50.77%
2024/26 52.67% 52.42% 51.70% 50.91%
2025/27 54.48% 54.01% 52.63% 51.11%
2026/28 56.21% 55.54% 53.56% 51.39%
2027/29 57.87% 57.01% 54.48% 51.72%
2028/30 59.45% 58.42% 55.40% 52.10%
2029/31 60.96% 59.78% 56.31% 52.53%
2030/32 62.41% 61.09% 57.21% 53.01%

Page 10

10 
0
5
10
15
20
2020-21 2021-22 2022-23 2023-24 2024-25
Number of Settled Claims
Carriageway Footway
£0.00
£2,000.00
£4,000.00
£6,000.00
£8,000.00
£10,000.00
2020-212021-222022-232023-242024-25
Total Cost Settled Claims
Carriageway Footway
2.3 Asset Valuation 
Table 2.3 Footway Valuation by Hierarchy       
Footway Hierarchy Gross Replacement
Cost 
Depreciated
Replacement Cost
Annualised
Depreciation Cost 
Higher Amenity Footways £11,399,861 £9,677,319 £73,519
Other Footways £97,735,436 £75,877,622 £963,961
Total £109,135,297 £85,554,941 £1,037,480 
2.4 Investment 
Footways investment of £500k for 2022/23 was Active Travel Funding and £750k for 2023/24 from Capital
investment part of which has been carried over into 2024/25 has improved certain areas, however this
requires sustained investment and there was no specific Capital investment for 2024/25, and no footway
allocation planned for 2025/26 or beyond. 
2.5 Public Liability Claims   
The cost and number of liability claims is linked to the condition of our road and footway network. Budget
reductions will impact the level of maintenance that can be afforded allowing road and footway condition to
deteriorate. A deteriorating network condition increases the risk of potential damage or injury to road users
from the greater occurrence of defects across the network.

Page 11

11 
2.6 Investment Options 
Below are a few initial revenue budget investment options for consideration. These will all require further
investigation, research, and development to progress more detailed information on which option is best
suited to support council objectives within the confines of available resources. Investment options should
be inked to the long-term maintenance strategy for the asset. 
Option 1 Undertake maintenance only on a reactive basis to repair defects within revenue budget allocation
BENEFITS DRAWBACKS CONSIDERATIONS
Continues service delivery for
defects
Continued long term asset deterioration Adopting risk-based approach to managing the
asset
Growing demands for capital investment Resource condition survey of asset to gain
information on asset needs
Rising number of public liability claims Development of long-term maintenance
strategy for asset group
Reactive is expensive and poor value Resource development of a prioritised list of
planned works   
Option 2 Increased investment in revenue planned maintenance activities
BENEFITS DRAWBACKS CONSIDERATIONS
Investment tackles asset
deterioration
Limited asset information and condition
data
Implementing SCOTS asset management
recommended practices
Planned works deliver better
value
Resources required to identify, quantify,
undertake works
Resource development of a prioritised list of
planned works
Reduced demand for reactive
works
Level of works limited within available
revenue budget allocation
Development of long-term maintenance
strategy for asset group
Less complaints     
Option 3 Develop business case for investment through capital budget for resurfacing/reconstruction of sub-standard
footways and footpaths. Develop 3-5 year rolling programme of works that can be prioritised in line with available resources
BENEFITS DRAWBACKS CONSIDERATIONS
Investment tackles
deterioration and gradually
improves whole asset
Limited asset information and condition
data 
Development of long-term maintenance
strategy for asset group
Demonstrates prudent
stewardship of assets
Resources required to identify scope of
works
Investment in mobile technology to capture
asset data
Supports corporate objectives Requires increased levels of investment
Implementing SCOTS asset management
recommended practices         
Option 4 Capital investment for improvement in kerbing in conjunction with carriageway surfacing and
street lighting projects. Requires a holistic planned approach across all asset groups to collaborate
works programmes that support overall council goals and objectives. A Street scene approach to
delivering improvements.
BENEFITS DRAWBACKS CONSIDERATIONS
All asset approach to
maintenance Requires substantial capital investment Use of SCOTS asset management tools    
Investment in mobile technology    
Development of appropriate maintenance
strategies

Page 12

12 
3.0 Street lighting 
3.1 Inventory 
The condition of street lighting assets is normally determined based on the age of assets. Unfortunately,
there is no available historic data on the installation dates for most street lighting assets. 
Street Lighting Quantities
(*Estimated as Asset Inventory is not complete)  Other Street Lighting Assets
Column Material Quantity Other Street Lighting Assets Quantity 
Non-Galvanised Steel 2,209* Wall Bracket 1,196
Galvanised Steel 9,196* Wooden Pole 110
Concrete 29 High Mast Column 0
Aluminium (pre-2000) 1,119 Control Cabinet 751
Aluminium (post 2000) 0 Other 0
Stainless Steel 8 Total 2,057
Cast Iron 0 Cable Assets (Estimated) Quantity (m)
Total 12,561* Cable under Carriageway (10%) 43,050
Luminaires Quantity Cable under Footway (50%) 215,250
All 13,896* Cable under Verge (40%) 172,200
Total 13,896 Total 430,500 
Illuminated Sign Assets
Illuminated Signs Quantity
Signs 433
Bollards 46
Total 479 
3.2 Condition 
Following previous investment in replacement of luminaires with new low energy LED Lanterns, data has
been collected on the condition of columns and apparatus across the network. Initial LED replacement
works highlighted an estimated number of columns in very poor condition and unsuitable for installing new
LED lanterns as per the below table. 
% Total Asset 
1- V. Good 33.95%
2 - Good 63.96%
3 - Fair 1.25%
4 - Poor 0.84%

Page 13

13 
3.3 Valuation 
Street Lighting Valuation
Column Assets
(*Estimated as Asset Inventory is not
complete)
Gross Replacement
Cost 
Depreciated
Replacement Cost 
Annualised
Depreciation Cost 
Non-Galvanised Steel* £4,102,436 £396,174 £164,097
Galvanised Steel* £17,113,977 £6,365,232 £570,466
Concrete £29,639 £988 £988
Aluminium (pre-2000) £1,182,740 £49,737 £29,569
Aluminium (post 2000) £0 £0 £0
Stainless Steel £8,164 £7,348 £117
Cast Iron £0 £0 £0
Cable Assets      
Cable under Carriageway £3,809,405 £2,001,951 £63,490
Cable under Footway £17,026,645 £8,949,015 £283,777
Cable under Verge £11,544,419 £6,066,921 £192,407
Other Street Lighting Assets      
Wall Bracket £641,402 £519,731 £16,035
Wooden Pole £112,257 £22,451 £2,245
High Mast Column £0 £0 £0
Control Cabinet £225,245 £99,216 £4,505
Total* £55,796,330 £24,478,763 £1,327,696
Luminaires Assets      
Total* £2,950,781 £2,040,139 £147,539
Illuminated Signs Assets      
Signs £257,626 £126,326 £10,305
Bollards £18,463 £9,167 £738
Total £276,089 £135,493 £11,043      
All Assets Total £59,023,200 £26,654,395 £1,486,278 
3.4 Investment 
Funding 
Current Year Anticipated Investment (£m)
Funding source  2024-25(£m)  2025-28(£m) 
Block Allocation Scottish
Government 0.150  0.000 
Block Allocation Carried Forward Scottish
Government 0.175  0.369 
Additional Council Allocation Council 0.300 0.321 
The replacement of deteriorated assets that have reached the end or beyond their expected service life is
currently not part of a longer-term maintenance strategy or plan. For many years the need to deliver
investment savings has overridden the need for asset renewals. This reduced funding has delayed asset
renewal projects creating an even older and more fragile asset base leading to a growing backlog of
outages and reactive maintenance demands on very limited resources.  
The LED project highlighted the condition of assets and the growing need for action to develop a longer-
term maintenance strategy for investment in asset renewals. Table 3.4 provides, and indicative treatment
cycle based on current average expected asset renewal and clearly illustrates the present investment
strategy is unsustainable.

Page 14

14 
0
500
1000
1500
2000
2500
3000
Annual Street Lighting Carbon
Emissions (Tonnes) 
Table 3.4 Street lighting Column and Cable Treatment Cycle    
Treatment
(*Estimated as Asset
Inventory is not complete)
Expected Service Life
(Yrs) 
Annual
Quantity
(Ave)   Inventory (No.)  Treatment Cycle
(Years) 
Column Replacement 30  25 No.  12561*  522 
Cable replacement  60  750 Lin m.  430,500 (Linear m)  574 
Luminaire (LED)    20  N/A  13896* All new assets 
3.5 Energy Consumption 
0
1000000
2000000
3000000
4000000
5000000
6000000
7000000
Annual Street Lighting Energy
Consumption (Kwh) 
Table 3.5 Annual Energy Consumption 
Year  Total   Unit 
2016/17 6,119,183.7 kWh
2017/18 4,288,415.2 kWh
2018/19 3,267,835.1 kWh
2019/20 3,232,557.7 kWh
2020/21 3,228,999 kWh
2021/22 3,224,175 kWh
2022/23 3,224,175 kWh
2023/24 3,232,362 kWh
2024/25 3,228,823 kWh
Year Carbon
Total
Units
2016/17 2733 Tonnes CO2
2017/18 1636 Tonnes CO2
2018/19 996 Tonnes CO2
2019/20 889 Tonnes CO2
2020/21 810 Tonnes CO2
2021/22 738 Tonnes Co2
2022/23 673 Tonnes Co2
2023/24 720 Tonnes Co2
2024/25 717 Tonnes Co2

Page 15

15 
3.6 Investment Options 
Below are a few initial revenue budget investment options for consideration. These will all require further
investigation, research, and development to progress more detailed information on which option is best
suited to support council objectives within the confines of available resources.  Investment options should
be linked to development of a long-term maintenance strategy for the asset. 
Option 1 Undertake maintenance only on a reactive basis to repair defects within existing revenue budget allocation
BENEFITS DRAWBACKS CONSIDERATIONS
Continues service delivery for
defects
Continued long-term asset
deterioration
Adopting risk-based approach to managing
the asset
Growing demands for capital
investment
Resource condition survey of asset to gain
information on asset inventory, condition Etc.   
Rising number of public liability claims Development of long-term maintenance
strategy for the asset group
Reactive maintenance is expensive
and poor value
Resource development of a prioritised list of
planned works   
Option 2 Increased investment in planned revenue maintenance activities
BENEFITS DRAWBACKS CONSIDERATIONS
Investment tackles worst
asset deterioration
Limited asset information and
condition data
Implementing SCOTS asset management
recommended practices
Planned works deliver better
value
Resources required to identify and
quantify works
Current use, Is it needed? Can it be
removed?
Reduced demand for reactive
works
Level of works limited within available
revenue budget allocation
Resource development of a prioritised list of
planned works
Less complaints   Development of long-term maintenance
strategy for the asset group   
Option 3 Develop a business case for investment through capital budget for replacement of obsolete, damaged and
deteriorated assets particularly vehicle safety barriers. Align the business case to a suitable long-term maintenance
strategy for the asset group.
BENEFITS DRAWBACKS CONSIDERATIONS
Investment tackles
deterioration and gradually
improves whole asset.
Limited asset information and
condition data
Development of a long-term maintenance
strategy for the asset group
Demonstrates prudent
stewardship of assets
Resources required to identify scope
of works
Investment in mobile technology to capture
asset data
Supports corporate objectives Requires increased levels investment
Implementing SCOTS asset management
recommended practices   
Option 4 Business case development for capital investment in conjunction with other asset groups that aligns with the
Road Asset Management Plan
BENEFITS DRAWBACKS CONSIDERATIONS
Whole asset approach to
maintenance
Requires substantial capital
investment Use of SCOTS asset management tools  
Requires significant improvement in
asset data Investment in mobile technology   
Development of appropriate maintenance
strategy

Page 16

16 
4.0 Structures 
4.1 Assets 
Table 4.1: Structures Inventory 
Quantity 
Road Bridges  890 
Footbridges  11 
Unusual Structures (cast Iron Bridges) 2 
Retaining Walls  961
Coastal Protection 923 
Height, Sign and Signal Gantry 0 
Culverts   294 
Subways Bridge stock condition is  0 
Total  3081  
Previously our Asset Management system was only able to record Coastal Protection assets under the
Retaining wall category. This aligns with how SCOTS asset Management Returns are produced. Previous
ASOR Report9ng was consequently a single retraining wall line combining Retaining Wall and Coastal
Protection asset stock. Coastal protection asset type has now been implemented in our asset management
system and retaining walls and coastal protection are recorded and reported separately. Coastal protection
assets typically comprise of coastal/tidal retaining sea walls, rock armour protection and other systems
such as embankments, reinforced soil solutions, gabion baskets. 
4.2 Condition 
Our bridges and structures are inspected and assessed to comply with the “Well-managed highway
infrastructure” Code of Practice. Data gathered from bridge inspections is used to calculate a Bridge Stock
Condition Indicator value which can enable analysis and trending of condition information. The condition
results since 2012/13 are illustrated in the chart below which shows a steady decline in overall bridge stock
condition from a reduction in capital investment with revenue investment being prioritised towards reactive
repairs. 
The long-term trend line in blue shows a continued deterioration of assets with condition of less critical
structures expected to decline further without increased levels of investment.  
There are currently 49 structures subject to special monitoring precautions and 28 bridges that have failed
the European standard assessment (prior to restrictions). 15 bridges are currently subject to acceptable
weight restrictions.
Bridges are subject to principal inspections every 6 years and general inspections every 2 years.

Page 17

17 
4.3 Asset Valuation 
Table 5.5 Structures Valuation Summary
Structure Type
Gross Replacement
Cost 
Depreciated
Replacement Cost 
Annualised
Depreciation Cost 
Road Bridges £115,437,382 £108,633,390 £1,267,044
Footbridges £2,934,648 £2,925,146 £2,117
Unusual Structures £2,286,856 £1,876,450 £18,390
Retaining Walls £166,492,505 £166,442,331 £20,470
Height, Sign and Signal Gantries £0 £0 £0
Culverts   £3,533,754 £3,542,437 £294
Subways £0 £0 £0
TOTALS £290,685,145 £283,419,754 £1,308,315 
4.4 Coastal Change Adaptation
The Climate Change (Scotland) Act 2008 places duties on Argyll and Bute Council for climate adaptation
(measures to increase resilience to the impacts of climate change). The Act requires the development of a
national adaptation programme to address the risks identified by the UK Climate Change Risk Assessment
(UKCCRA) for Scotland. In the most recent National Summary for Scotland coastal erosion and flooding
feature amongst the highest priority risks.   
Coastal Change Adaptation Plans are produced by Argyll and Bute Council to report on how the Council
helps to deliver the Scottish Climate Change Adaptation Programme 
4.4.1 Assets  
Table 4.2.1: Flood Risk Management Inventory 
Quantity
Coastal Change Adaptation 0 
Total  0 
4.4.2 Investment
PLANNED INVESTMENT    
2025-26
£m
2026-27
£m Comments
CAPITAL
Coastal Change
Adaptation - Case
Study - Inverlussa,
Jura 
0.050 0 2025-26 Coastal Change Adaptation (Year 4) - Case Study -
£50k - Capital Grant Allocation
Coastal Change
Adaptation - Case
Study - Laggan Bay,
Islay 
0.050  0 2025-26 Coastal Change Adaptation  (Year 4) - Case Study
- £50k - Capital Grant Allocation
Coastal Change
Adaptation - Case
Study - Tiree
0.060 0 2025-26 Coastal Change Adaptation  (Year 4) - Case Study
- £60k - Capital Grant Allocation
Cycle 2 & 3 Schemes 0.246 0.250
• Coastal Change Adaptation Plans
• £65k Case Study added with 2024-25 Allocation. This is
scheduled to be paid out in 2023-24 to Luing
Community so funding shown in this line. 
• £65k contributed directly to fund Luing Community
Coastal Change Adaptation Works,
• Inverlussa coastal works.

Page 18

18 
4.5 Reservoirs
In accordance with the Reservoirs (Scotland) Act 2011, Argyll and Bute Council are Reservoir Manager for
3 reservoirs.
• Bishops Glen Reservoir, Dunoon,
• Kirk Dam Reservoir, Rothesay,
• Millknowe Flood Storage Area, Campbeltown.
The assets came under the remit of Infrastructure Design in 2025 along with a number of required
improvement actions.   
4.5.1 Assets  
Table 4.2.1: Flood Risk Management Inventory 
Quantity 
Reservoirs 3 
Total  3 
4.5.2 Investment
PLANNED INVESTMENT    
2025-26
£m
2026-27
£m
Comments
CAPITAL Bishops Glen
Reservoir,
Dunoon, 
TBC TBC Annual Reservoir Management funding
Kirk Dam
Reservoir,
Rothesay,   
TBC TBC Annual Reservoir Management funding
Millknowe Flood
Storage Area,
Campbeltown.  
TBC TBC Annual Reservoir Management funding
REVENUE Bishops Glen
Reservoir,
Dunoon, 
TBC TBC One-off costs identified during handover period
2025-26
Kirk Dam
Reservoir,
Rothesay,   
TBC TBC One-off costs identified during handover period
2025-26
Millknowe Flood
Storage Area,
Campbeltown.  
TBC TBC One-off costs identified during handover period
2025-26

Page 19

19 
4.6 Investment 
PLANNED INVESTMENT    
2024-25 2025-26 2026-27 2027-28 2028-29 Comments
CAPITAL
Bridge Strengthening
/Replacement
Programme
£141k £293k £400k  £400k  £400k Bridge & Retaining
Wall:
• Strengthening
• Replacement 
Local Bridge
Maintenance Fund –
Grant Funding
Secured
£213k £1,777k £1,000k  £1,000k £1,000k
Coastal Protection £96k £150k £150k  £150k  £150k
Coastal Protection
Strengthening
repairs
Ardbeg Seawall /
Bute Sea Wall
Repairs
£274k £359k   TBC
TBC
TBC 
Repairs of asset
following December
2021 storm damage
Coastal Change
Adaptation £55k £250k  £250k
TBC
TBC 
Secured funding for  
Coastal Change
Adaptation
REVENUE
Structural
Maintenance £231k TBC TBC  TBC TBC
Bridges & Retaining
Walls:
• Maintenance &
Repair,
• Inspection,
• Asset
Management
• Abnormal Load
Monitoring,
• Technical
Approval
Budget confirmed
Annually
Structural
Assessment £64k TBC TBC  TBC TBC
Assessment of
Bridges & Retaining
Walls. 
Budget confirmed
Annually
Coastal Protection £180k TBC TBC  TBC TBC
Inspections,
Maintenance &
Repairs, Asset
Management 
Budget confirmed
Annually
Coastal Change
Adaptation £55k £250k  £250k
TBC
TBC 
Secured funding for  
Coastal Change
Adaptation 
4.7 Maintenance backlog 
Headline Backlog Figure   Steady State Figure  Source 
£32.4m   N/A  Argyll and Bute Council Asset Management
Reporting

Page 20

20 
4.8 Flood Risk Management
Argyll and Bute Council has a statutory duty under the Flood Risk Management Act (Scotland) 2009 to
reduce the overall flood risk through Local Flood Risk Management Plans subject to funding availability.
This includes Flood Incident Investigation, Waterbody Assessments, Provision of Flood Consultancy
(General Flood Advice), Clearance and Repair Works, Mapping, Flood Risk Assessments, Flood Studies, 
Flood Monitoring Network, Production and Update of Local Flood Risk Management Plans. These works
are undertaken in conjunction with the Scottish Environment Protection Agency (SEPA) and other
responsible authorities as defined under the Act. The current budget allocation for flood risk management
are shown in table below. 
PLANNED INVESTMENT    
2024-25
£m
2025-26
£m Comments
CAPITAL
Flood Protection 1.213  0.500 • Tigh Dearg
• Rothesay FPS Performance
Helensburgh Flood
Mitigation  0.000  0.427  
Campbeltown
Flood Protection
Scheme
1.780 0.010
Design & Construction of Flood Protection Scheme.
80% of costs at contract award funded by Scottish
Government.
All other costs funded by ABC.
REVENUE
Flood Management 0.222 0.222
• Flood Incident Investigation 
• Waterbody Assessments 
• Provision Of Flood Consultancy (General Flood
Advice) 
• Clearance and Repair Works
• Mapping
• Flood Risk Assessments
• Flood Studies
• Flood Monitoring Network
• Production and Update of Local Flood Risk
Management Plans
Budget confirmed Annually
Flooding Direct
Costs 0.101 0.101 Works by ABC Operational Services
Budget confirmed Annually 
4.9 Match Funding Opportunities 
Under Cycle 1 the Council has been successful in securing funding for flood studies and physical works
such as those underway in Campbeltown. These studies and physical works have been 80% funded by
Scottish Government and 20% by the Council. At the time of writing, the next round of flood funds has not
been released, and it is currently unknown as to what, if any, funding will be available and over what period. 
4.10 Investment Options 
Below are a few initial revenue budget investment options for consideration. These will all require further
investigation, research and development to progress more detailed information on which option is best
suited to support council objectives within the confines of available resources. Investment options be linked
to development of a long-term maintenance strategy for the asset.

Page 21

21 
Option 1 Undertake maintenance only on a reactive basis to repair defects within existing revenue budget
allocation
BENEFITS DRAWBACKS CONSIDERATIONS
Continues service delivery
for defects
Continued asset deterioration Development of a long-term maintenance
strategy
Increased risk of more weight
restrictions or road closures
Strengthen the business case for
investment
Impacts economy and vital transport
links
Explore funding opportunities Etc. (Flood
prevention Etc)
Reactive maintenance is expensive
and poor value     
Option 2 Increased investment in revenue planned maintenance activities
BENEFITS DRAWBACKS CONSIDERATIONS
Continues service delivery
for defects
Asset deterioration remains greater
than investment
Development of long-term maintenance
strategy
Tackles some preventative
maintenance backlog
Impacts economy and vital transport
links
Strengthen the business case for
investment
Contributes to lowering risk
of more weight restrictions
or road closures
Reactive maintenance is expensive
and poor value
Explore funding opportunities Etc. (Flood
prevention Etc)         
Option 3 Develop business case for investment through capital budget for strengthening and refurbishment of
structures. Development and implementation of an appropriate long-term maintenance strategy for the group.
Continued improvement in asset management.
BENEFITS DRAWBACKS CONSIDERATIONS
Contributes to development
of more sustainable asset
management regime
Requires investment Development of a long-term maintenance
strategy
Planned preventative
maintenance programme of
works
Requires resource to develop
business case
Strengthen the business case for
investment
More sustainable asset
condition  
Explore funding opportunities Etc. (Flood
prevention Etc)
Supports corporate
objectives  
Resources to undertake increased
workload   
Option 4 Development of a successful business case for investment to tackle deterioration and improve
overall asset conditions as part of a developed asset management process.
BENEFITS DRAWBACKS CONSIDERATIONS
Sustainable asset
management regime
Requires substantial level of
investment
Development of a long-term maintenance
strategy
Improves asset condition Requires resource to develop
successful business case
Resources to undertake / manage
increased workload and project design
and development
Reduced weight restrictions May require additional data capture
to support business case
development
Explore funding opportunities Etc. (Flood
prevention Etc.)
Supports corporate
objectives

Page 22

22 
5.0 Traffic Signals 
5.1 Inventory 
Traffic Signal Types Quantity  Other Traffic Management
System Types Quantity 
Traffic Signal (Junction)    Information Systems 2
Minor Junction  0 Safety Cameras 0
Medium Junction  11 Variable Message Signs 2
Major Junction  0 Vehicle Activated Signs 18
Complex Junction 0 Real Time Passenger Information 0
Traffic Signal (Pedestrian Crossing)       
Single Carriageway 14    
Double Carriageway 0    
Total 25 Total 22 
5.2 Valuation 
Traffic Signal Types Quantity  Gross
Replacement Cost 
Depreciated
Replacement Cost
Annualised
Depreciation
Cost
Junctions 11 £589,652.61 £328,329.30 £24,568.86
Pedestrian Crossings 14 £333,540.87 £135,500.98 £14,592.41
Total 25 £923,193.48 £463,830.28 £39,161.27 
5.3 Investment Traffic management systems require specialist contractors to undertake regular inspection
and necessary maintenance. Increasing reactive maintenance costs are being incurred as some assets are
functioning beyond their expected service lives and when problems arise replacement of obsolete parts is
difficult to procure. 
Many traffic management assets have had essential works postponed over time due to budget restrictions.
Although it is the smallest asset group delays in asset renewal particularly electronic hardware can lead to
parts becoming obsolete as advances in technology become available. A recent survey has highlighted the
need for some urgent repairs to bring systems up to date. Historically junctions and pedestrian crossing
have been replaced ad hoc in response to system failures or inability to obtain replacement components.
Generally, this equates to approx. one junction or crossing per year.  The table below provides an indicative
illustration of the asset renewal cycle. 
Planned Investment Budgets 2024-25 2025-26
Capital  £-Nil £-Nil
Revenue £45k £45k
Total Budget £45k £45k

Page 23

23 
5.4 Investment Options 
Below are a few initial revenue budget investment options for consideration. These will all require further
investigation, research and development to progress more detailed information on which option is best
suited to support council objectives within the confines of available resources.  Investment options should
be linked to development of a long-term maintenance strategy for the asset. 
Option 1 Continue to fund Traffic Signals within existing annual allocation of £45k revenue budget
BENEFITS DRAWBACKS CONSIDERATIONS
Maintains existing service
Specialised works undertaken by
external contractors
Revised tender for routine inspection and
maintenance
Deteriorated asset base drives
increasing reactive maintenance
costs
Require additional resource to develop
appropriate business case
Requires occasional capital
investment to replace obsolete /
defective equipment     
Option 2 Utilise latest condition survey data to develop an appropriate business case for investment in renewal
of apparatus
BENEFITS DRAWBACKS CONSIDERATIONS
Improved asset reliability Requires investment Resource and staff training to improve
asset knowledge
Reduced maintenance costs
Requires resource to develop
suitable business case for
investment using capital budget
Development of a suitable maintenance
strategy for the asset    
Requires resource to procure tenders and
administer / supervise potential contract
works   
Option 3 Produce a business case based on latest survey data to upgrade all apparatus to meet compliance
with current standards over a three to five year period.
BENEFITS DRAWBACKS CONSIDERATIONS
Modernises asset to meet
current standards Requires investment Resource to manage and supervise works
Improves reliability
Require resource to develop suitable
business case for investment using
capital budget
Resource required to procure tender
documentation and administration of same
Reduces reactive
maintenance   Use SCOTS Asset management tools
Improves user experience       
Option 4 Utilise latest condition survey data to identify asset needs. Address any priority repairs and progress a
maintenance strategy as part of the RAMP to develop a long-term investment plan over three-five years to bring
asset condition to meet compliance with current standards.
BENEFITS DRAWBACKS CONSIDERATIONS
Modernises asset to meet
standards Require investment Resources to manage and supervise works
Improves reliability
Requires resources to develop
suitable business case for
investment using capital budget.
Resources required to procure tender
documentation and administration of same
reduces reactive
maintenance costs   Use SCOTS asset management tools
Improves user experience  
Assess need for individual assets. Can
they be removed? Are alternative control
measures available?

Page 24

24 
6.0 Street Furniture 
6.1 Assets 
Table 6.1 Street Furniture Quantities
Street Furniture Assets Quantity of Assets Unit
Traffic Signs (non-illuminated) 5,152 Number
Safety Fences 610 Length (m)
Pedestrian Barriers 4 Length (m)
Street Name Plates Currently No Data in the system Number
Bins Currently No Data in the system Number
Bollards 318 Number
Bus Shelters 119 Number
Grit Bins 581 Number
Cattle Grids 161 Number
Gates Currently No Data in the system Number
Trees Currently No Data in the system Number
Seating Currently No Data in the system Number
Verge Marker Posts 2,318 Number
On-Street Parking Meter 92 Number
Electric Car Charging Points 35 Number
Milestones Currently No Data in the system Number
Information Boards Currently No Data in the system Number
Bike Parking Lockers Currently No Data in the system Number
Bike Parking Stands Currently No Data in the system Number
Automatic Trash Screens Currently No Data in the system Number
Watercourse Telemetry Currently No Data in the system Number
Weather Stations 14 Number 
6.2 Condition
Asset visual condition surveys are not currently undertaken due to limited resources and cost implications.
Asset condition is normally determined using asset installation data and a default service life in years.
Argyll and Bute Council have very limited data available regarding installation dates of historical assets
which limits the ability to provide detailed analysis of current asset condition.

Page 25

25 
6.3 Valuation 
Street Furniture Valuation
Street Furniture Assets Gross Replacement Cost Depreciated
Replacement Cost 
Annualised
Depreciation Cost 
Traffic Signs (non-illuminated) £167,697.60 £83,852.06 £8,384.88
Safety Fences £47,641.00 £23,820.50 £2,382.05
Pedestrian Barriers £312.40 £168.70 £12.50
Street Name Plates Currently No Data in the system  
Bins Currently No Data in the system  
Bollards £20,698.62 £10,168.36 £827.94
Bus Shelters £1,503,877.59 £757,625.73 £75,193.88
Grit Bins £75,625.14 £39,079.50 £5,041.68
Cattle Grids £838,279.45 £411,017.27 £33,531.18
Gates Currently No Data in the system  
Trees  Currently No Data in the system  
Seating Currently No Data in the system  
Verge Marker Posts £60,343.91 £31,188.10 £4,022.93
On-Street Parking Meter £394,531.20 £197,694.44 £19,726.56
Electric Car Charging Points £804,083.50 £447,989.38 £80,408.35
Milestones Currently No Data in the system  
Information Boards Currently No Data in the system  
Bike Parking Lockers Currently No Data in the system  
Bike Parking Stands Currently No Data in the system  
Automatic Trash Screens Currently No Data in the system  
Watercourse Telemetry Currently No Data in the system  
Weather Stations £257,660.32 £132,511.02 £12,883.02
Total £4,170,750.74 £2,135,115.04 £242,414.96 
6.4 Investment 
The street furniture asset consists of many different individual assets all of which deteriorate at different
rates. Generally, assets deteriorate to the point where they stop performing their intended function and are
replaced with new items in line with available funding. Table 6.4 below provides an indication of the renewal
cycle for some street furniture assets based on previous year budget allocation and estimated asset
renewal rates to calculate an indicative renewal cycle based on current funding allocation. 
Table 6.4 Indicative Treatment Cycle for Asset Renewals 
Item 
Budget Allocation   
2024-25 
Current Inventory
Data 
Annual Replacement
Quantity 
Indicative Renewal
cycle (Years) 
Cattle Grid  £54,000  162  1.6  101 
Traffic Signs  £30,000  5010  173  29 
Vehicle Safety Fence  £100,000  616289  653  94

Page 26

26 
6.5 Investment Options 
Below are a few initial revenue budget investment options for consideration. These will all require further
investigation, research, and development to progress more detailed information on which option is best
suited to support council objectives within the confines of available resources.  Investment options should
be linked to development of a long-term maintenance strategy for the asset. 
Option 1 Undertake maintenance on a reactive basis to repair defects within existing revenue budget
BENEFITS DRAWBACKS CONSIDERATIONS
Continues service delivery
for defects
Continued long-term asset
deterioration
Adopting risk-based approach to managing
the asset
Growing demands for capital
investment
Resource condition survey of assets to
gain information on inventory, condition
Etc,
Rising number of public liability
claims
Development of a long-term maintenance
strategy for the asset group
Reactive maintenance is expensive
and poor value
Resource development of a prioritised list
of planned works   
Option 2 Increased investment in planned revenue maintenance activities
BENEFITS DRAWBACKS CONSIDERATIONS
Investment tackles worst
asset deterioration
Limited asset information and
condition data
Implementing SCOTS asset management
recommended practices
Planned works deliver
better value
Resources required to identify and
quantify works
Current use, is it needed? Can it be
removed?
Planned works deliver
better value
Level of works limited to available
revenue budget allocation
Resource development of a prioritised list
of planned works
Less complaints   Development of a long-term maintenance
strategy for the asset group   
Option 3 Develop a business case for investment through capital budget for replacement of obsolete, damaged
and deteriorated assets particularly vehicle safety barriers. Align the business case to a suitable long-term
maintenance strategy for the asset group.
BENEFITS DRAWBACKS CONSIDERATIONS
Investment tackles
deterioration and gradually
improves whole asset
Limited asset information and
condition data
Development of a long-term maintenance
strategy for the asset group
Demonstrates prudent
stewardship of assets
Resources required to identify and
quantify scope of works
Investment in mobile technology to capture
asset data
Supports corporate
objectives
Requires increased levels of
investment 
Implementing SCOTS asset management
recommended practices   
Option 4 Business case development for capital investment in conjunction with other asset groups that aligns
with the Road Asset Management Plan (RAMP) and council priorities.
BENEFITS DRAWBACKS CONSIDERATIONS
Whole asset approach to
maintenance
Requires substantial capital
investment Use of SCOTS asset management tools  
Requires significant improvement in
asset data Investment in mobile technology    
Development of appropriate maintenance
strategy 
7. Road Operations Projects 
Photographs of recent projects can be viewed at Appendix Two.