ARGYLL AND BUTE COUNCIL   ENVIRONMENT, DEVELOPMENT
AND INFRASTRUCTURE COMMITTEE                                                                          
ROAD AND INFRASTRUCTURE                                 18 DECEMBER 2025 
ANNUAL STATUS AND OPTIONS REPORT 2025-26 
1.0       EXECUTIVE SUMMARY
1.1  The Annual Status and Options Report (ASOR) provides an overview of road
infrastructure assets within Argyll and Bute Council based on 2024-25 data for
asset condition, previous investment, asset valuation and other relevant
information. The report provides information, based upon current available
data, on the condition of the asset and future options which can be considered
in terms of investment. 
The ASOR provides details on each of the following assets: 
• Roads
• Footways
• Structures such as Bridges
• Street Lighting and Traffic Signals
• Street Furniture
• EV Chargers 
1.2  The annual scanner survey programme measures several properties of the
carriageway surface. The Road Condition Index (RCI) measures
• Surface Texture
• Cracking
• Rutting (Transverse profile)
• 3m Longitudinal profile (potholes)
• 10m Longitudinal profile (ride quality) 
The RCI score is the cumulative value of these main parameters and
consequently the higher the RCI score, the poorer the overall condition of that
section of the network. It should be noted that in the past few years, the
external Road Condition Index (RCI) report did not survey our full area with
most of our Islands missed. A full survey was carried out in the 2nd part of
2024 and details were received in December 2024 which officers have
reviewed and analysed.

Page 2

1.3  The data for the condition survey carried out this year (2025) will generate the
2024-26 RCI figure. The data is being analysed by the service provider
towards issue to SCOTS local authorities in December 2025. The survey
results will be used to inform the following years capital works programme
2027-28. This will be formulated during Summer 2026 in consultation with
local Operations Teams and Elected Members. 
1.4  The ASOR appendix lists have used 2024 figures as the most up to date RCI
score. The report sets out the 2025-26 road and associated infrastructure
condition and forecasts future condition based on different proposed levels of
investment. 
1.5  The ASOR demonstrates that previous investment in the Roads
Reconstruction Programmes has resulted in only a slight deterioration of the
road condition. This has only been possible with the support from members
allowing an average budget of nearly £8M. Whilst the condition has slightly
deteriorated, without the increased investment from Council, the road
condition would have continued to deteriorate at a faster extent, resulting in
our road network being in an extremely poor condition. The condition surveys
carried out nationally have a lag of 2 – 4 years (due to not all of the network
being surveyed in one year). Argyll and Bute’s carriageway condition survey is
anticipated to worsen should there be a reduction in available investment
below £10m. Currently Argyll and Bute Council is listed as having the highest
RCI ( roads in need of repair) within our family group consisting of roads
authorities with similar roads networks. This means that our roads index is the
poorest of the 8 family group members for rural authorities in Scotland. 
1.6  Within the ASOR report, the respective asset groups are identified with four
investment options presented to allow members to consider appropriate future
funding. This will allow a more informed budget setting process for the
maintenance and improvement of Roads and Infrastructure assets. 
1.7  The ASOR is a useful tool in assisting Members to make informed strategic
decisions regarding investment of our limited Capital resources.

Page 3

ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE                                                                           
ROAD AND INFRASTRUCTURE                                    18 DECEMBER 2025 
ANNUAL STATUS AND OPTIONS REPORT 2025-26 
2.0 INTRODUCTION
2.1 This report introduces the Annual Status and Options Report which makes an
analytical assessment of the condition of the Council’s Road Network and
associated infrastructure as well as setting out projected conditions based on
varying levels of investment.  
3.0 RECOMMENDATIONS
3.1 It is recommended that the Environment, Development and Infrastructure
Committee:- 
• Endorses the Annual Status and Options Report and the positive
analytical feedback it provides and agrees to use the information for
future budget setting; and 
• Notes the significant investment by Council over the last few years
which has allowed officers to reduce the deterioration to our road
network and consider that the current block allocation for all Roads and
Infrastructure services reduces to £3.823m in 2026-27 and 2027-28
which if not increased in line with the reports funding requirements will
mean a deterioration in our road condition (see Paragraph 1.8) and
subsequently affect our communities. 
• Recommends to Council that they consider increasing the resource for
roads reconstruction in 2026/27. 
4.0 DETAIL
4.1 The ASOR is a report which forms part of a suite of documents that are
recommended by SCOTS for local authorities use. The documents have been
developed in collaboration with all Scottish and Welsh authorities and aim to
improve processes and continue the development and implementation of the
wider use of recognised asset management techniques. When authorities have
fully developed the use of these documents, they will enable better value for

Page 4

money to be delivered and prudent stewardship of the road asset to be
demonstrated. 
4.2  SCOTS have focused on carriageway condition including backlog value and
steady state figures due to carriageways being the single most valuable Council
asset. 
4.3  The ASOR is also a tool which elected members can use to help set priorities
for investing the limited resources available to the Council. 
4.4  At the Argyll and Bute Council Budget Meeting in February 2025, a £10M
investment programme for roads reconstruction was approved. This was split
into £8M for road capital work and £2M for reactive extreme weather works
which are being used to repair the Storm Eowyn damage to our Network. This
continued investment coupled with the level of revenue investment over the last
few years has helped to halt the decline in our roads network condition. 
RCI for 2018-20 = 54.2% of roads needing improvement 
RCI for 2020-22 = 49.8% of roads needing improvement 
RCI for 2021-23 = 48.8% of roads needing improvement 
RCI for 2022-24 = 49.8% of roads needing improvement 
RCI for 2023-25 = 50.7% of roads needing improvement 
Previous levels of investment have limited the deterioration of the surfacing and
acted as a contributory factor in reducing the number of CAT 1 & 2 road defects.
4.5  The RCI survey data is utilised along with other relevant available data such as
SCRIM (sideway-force coefficient routine investigation machine), Accident
Statistics, Road Hierarchy, Inspection data and local engineering judgement to
develop an initial list of suitable schemes for inclusion in the road reconstruction
programme. The WDM pavement management system interrogates all the
available data to identify and rank potential schemes. Once a draft list is
compiled further analysis is carried out by local staff to establish scheme costs,
treatment options etc. this is then matched to available funding. The selection
process is under regular review and has been steadily improved over time. 
5.0 CONCLUSION
5.1 This ASOR report has been developed in line with the SCOTS Asset
Management Project and provides a useful resource aimed at providing
relevant decision makers with information which will allow a more informed
choice to be made in respect of future investment options. 
6.0 IMPLICATIONS
6.1 Policy – The ASOR contributes towards policy for infrastructure and roads.

Page 5

6.2 Financial – Current investment levels require to be increased to provide a
steady state for the roads network.  
6.3  Legal – Potential legal action should the road network deteriorate with road
users claiming for damage to vehicles.
6.4  HR – None known.
6.5 Customer Service – Reduction in public service should roads be closed due to
a lack of investment.
6.6 Risk – A failure to manage the road network appropriately would severely affect
the Road Condition and also lead to increased insurance actions and a
reduction in public opinion of the council.
6.7  Climate Change –the impact of climate change on key infrastructure is expected
to increase in the coming years.  
6.8  Fairer Scotland Duty: None known.
6.9 Equalities - protected characteristics – None known.
6.10   Consumer Duty – Reduction in public service should roads be closed due to a
lack of investment.
6.11 Island Communities – the reduction in the Ferry Prices (RET) has increased
numbers of vehicles on island roads which has caused more damage to the
island road network.
6.12 Children’s Rights and Wellbeing – None arising from this report. 
Executive Director with responsibility for Development and Infrastructure:
Kirsty Flanagan
Policy Lead for Roads and Transport: Councillor John Armour 
December 2025                                              
For further information contact: 
Andrew Summers Head of Road and Infrastructure Services 
andrew.summers@argyll-bute.gov.uk 
Hugh O’Neill, Network and Standards Manager
hugh.oneill@argyll-bute.gov.uk  
APPENDICES
Appendix 1 – ASOR Report 
Appendix 2 – Photographs of work carried out to our network assets in 2023-25