A town with no name
In 2011 Dunoon disappeared from CalMac advertising literature.
After 13 years of ‘continuous improvement’ and a specific action to re-
establishing the town in advertising Transport Scotland and CalMac have
managed to represent the town by an unnamed red dot in the current route
map! Tourists use these maps to plan their visits.

Page 2

Success
1954 Dunoon Gourock
Scotland’s first seagoing ferry service
Ideal location, bypassing the Rest-and-be-thankful to connect the
Central Belt to a large swathe of Argyll
1973 Arrival of Western Ferries
Further strengthens the whole transport network increasing
• Resilience
• Capacity
• Choice
First Clouds
1981 A Public Enquiry roundly rejects a proposal that Western should
be a given a vehicle carrying monopoly with the town centre crossing
becoming passenger only.
It found that such a scheme would be:
• Deeply damaging to the local economy
• Small passenger only ferries would be unreliable
1998 A Deloitte Touche report reiterates that large vessels are
required to operate reliably on the town centre crossing

Page 3

Folly
2011 The town centre vehicle service that the town had evolved
around for almost 60 years ends. Cowal/Argyll is set back 40 years to
having only a single vehicle ferry service bypassing the ‘Rest’. A
passenger only service using small ferries is introduced despite the
previous reports and severe problems on the ‘Rest’
As predicted the passenger service is horrendously unreliable it can be
off completely for four consecutive days.
There is an immediate negative effect on the local economy,
passenger number to Cowal Games drop dramatically.
The ‘Rest’ blocks repeatedly.
The service costs more to run than the previous one because vehicle
carrying generated profit.
Reintroduction of a town centre vehicle ferry service becomes
official Government policy in the Scottish Ferries Plan
Plans for a Transport Regulator with statutory powers are quietly
dropped.
2013 The MVA Report paves the way for reintroduction of a vehicle
service as vehicle carrying is shown to be profitable in all scenarios. It
also states vessels must be at least 40m long to operate reliably.
2017 The ferries should have been replaced as the original contract
was for 6 years.
2018 Official Policy is reversed, the crossing is to remain passenger
only,  using small vessels, no credible explanation for the decision has
ever been given.
2023 The cost of replacement passenger only ferries has effectively
doubled as the Kilcreggan Gourock crossing is now going to have to
use vessels with a different design to those for Dunoon Gourock

Page 4

Islands Connectivity ???
Major works on the A82 & A83 will impact access to the whole of Argyll.
However as we have already seen Climate Change will disrupt the road network in multiple places.

Page 5

Unsustainable
Tickets on the Dunoon Gourock town passenger service cost 46%
more than the significantly longer Wemyss Bay to Rothesay crossing
Gourock is going to have a brand new vehicle ferry port with ongoing
costs but with no scheduled vehicle ferry service running to it.
Removal of the town centre vehicle service handed Western Ferries a
monopoly at the same time as reducing resilience and capacity in the
transport network.
Major work are planned on both the A82 & A83 leaving all of Argyll
vulnerable to transport network disruption even without Climate
Change.
Queues of 1.5 hours can develop for the 20min ferry crossing because
on its own Western lacks the capacity to deal with road network
disruption or major events.
The loss of resilience means that drivers have experienced difficulty
getting to Western when town centre ports were still accessible.
Western has a 33% profit margin.
25% of all the private vehicles carried by ferries in Scotland are
carried on Western Ferries without RET.
A family of 4, a car with a family of 2 adults and 2 children costs
£33.20 for a single on the 2 mile, 20 minute crossing.
Western’s Commercial Vehicle fares are unpublished but it is
believed that they are 6 to 7 times the rate on the Wemyss Bay to
Rothesay crossing.
This is environmentally damaging as the vast bulk of HGVs travel
by road to avoid the high ferry fares.
In the long term the above is unsustainable.
In the absence of an alternative vehicle ferry service:
• Western’s basic commercial fares must be published.
• RET must be introduced on both Western and the town centre
crossing.
• Passenger ferries of 40m  plus must be provided.