Page 1

1 
Argyll & Bute Community Planning
Partnership 
Area Community Planning Group 
Partnership update
Date:  4 February 2025 
Partner update – Transport Scotland 
Summary of updates for TS Roads;
• Rest & Be Thankful – continuing daily management of the traffic management on this
stretch of the A83 to ensure safe passing of the travelling public with regular
stakeholder updates advising of changes to the traffic management. There is a final
section of debris flow barrier still to be installed at sectors 3a & 3b which is now
planned for February, all of which is carried out in full co-ordination with the ongoing
ground investigation works which will assist the design of the long term solution
(Debris Flow Shelter).
• Cairndow – Signing improvements, still waiting for SSE to determine power
connection but understand that they now have a way forward with remaining signs
ready to be installed when SSE have completed their works.
• Emergency works at Furnace (although slightly out with the area of concern for
Cowal peninsula) were successfully completed during November 2024 to mitigate
river erosion which was presenting a hazard to the operation of A83. This was
rectified with the placement of rock bags on the embankment of Leacann Water in
order to mitigate any further issues. 
Other works of note to be carried out before the end of this financial year include; 
• Re-surfacing works at West of Ardgarten
• Bridge works on Fyne Bridge
• Drainage works at Loch Fyne Oyster Bar, Succoth 