Democracy Spraffa

00576_RoH EJ_ final amended 11.11

Argyll and Bute Council · 18 November 2025
Back to Planning, Protective Services and Licensing Committee — 18 November 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning Permission
in Principle 
Reference No: 25/00576/PP
Planning Hierarchy: Local Application
Applicant: Mr Kyle Kennedy
Proposal: Erection of dwellinghouse, formation of vehicular access and
associated works
Site Address:  Land Between Lagarie Lodge And Lagarie House Torwoodhill
Road Rhu Argyll And Bute      
DECISION ROUTE 
Committee Decision under Local Government Scotland Act 1973   
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission
• Erection of dwellinghouse
• Formation of vehicular access and associated works
• Tree removal 
(ii) Other specified operations
• N/A 
(B) RECOMMENDATION: 
Having due regard to the Development Plan and all other material considerations, it is
recommended that planning permission be granted subject to the conditions and reasons
appended to this report. 
(C) CONSULTATIONS:   
Core Paths – No response, therefore, assumed no objection. 
Scottish Rights Of Way And  Access Society -  No response, therefore, assumed no
objection. 
Scottish Water - 24.04.2025 –  No objection however Scottish Water have noted; There is
currently sufficient capacity in the Blairlinnans Water Treatment Works to service your
development. However, please note that further investigations may be required to be carried
out once a formal application has been submitted to us. This proposed development is within

Page 2

the Rhu Sep Waste Water Treatment Works catchment. Single house developments; unless
utilising private drainage methods, are required to submit a Waste Water Application via our
Customer Portal to allow us to fully appraise the proposals. We recommend that this is done at
the earliest opportunity to allow for network appraisal to be carried out ahead of development
proceeding. The applicant should be aware that we are unable to reserve capacity at our water
and/or waste water treatment works. When planning permission has been granted and a formal
connection application has been submitted, we will review the availability of capacity at that
time and advise the applicant accordingly. For reasons of sustainability and to protect our
customers from potential future sewer flooding, Scottish Water will not accept any surface
water connections into our combined sewer system. There may be limited exceptional
circumstances where we would allow such a connection for brownfield sites only, however this
will require significant justification from the customer taking account of various factors including
legal, physical, and technical challenges. 
Roads Helensburgh And Lomond - 08.05.2025 –  No objection subject to conditions relating
to; detailing of the vehicular access, gradients, surfacing materials, visibility splays, parking
provision, turning, drainage and gates. 
Roads Helensburgh And Lomond – 05.11.25 - No objection subject to conditions. Roads
have updated their initial consultation response to ensure consistency with previous
recommendations for the site. The recommended conditions relation to the vehicular visibility
splay has been updated as well as the condition relating to the access detailing. 
Built Heritage Conservation Officer - 06.06.2025 – Notes that the principle of development
on the site has been accepted through the approval of 23/01502/PP, which remains extant.
However, the built heritage conservation officer also notes potential issues with the proposed
design and suggests some possible amendments (see detailed comments with assessment
below). 
Built Heritage Conservation Officer - 14.10.2025 – The built heritage conservation officer
was re-consulted on design amendments and relays concern in regards to the accuracy of the
submitted drawings, the proposed materials and also the apparent lack of a further assessment
as per NPF4 Policy 7 (see detailed comments with assessment below). 
Local Biodiversity Officer - 08.05.2025 – No objections, however, additional information has
been requested by way of the following: European protected species surveys for bats and otter
prior to determination, further protected species surveys prior to works starting on site, Tree
survey prior to determination and details of proposed bio-diversity enhancement measures
(see detailed comments with assessment below). 
Local Biodiversity Officer - 24.09.2025 – The Local Biodiversity Officer was re-consulted on
the submitted tree survey and bat scoping survey report in light of their initial consultation
response. The Local Biodiversity Officer confirms that the submitted bat scoping survey report
has been undertaken by an appropriately qualified person and that a desk-study search shows
there are no otters within 5km of the site and no waterways are present on the site. As a
precautionary approach, and due to the transient nature of wildlife, they ask that a pre-works
survey is carried out for Protected Species. 
(D) HISTORY:   
C6986 
Conversion of Lagarie house from children’s home to from 4 flats, including the erection of 4
detached dwellinghouses to the West of the Lagarie house. Note: During determination the
proposal for 4 dwellinghouses was reduced to 3 dwellinghouses. 
24.05.1983 (application approved) 
C6986

Page 3

Erection of 3 dwellings houses 07.07.1983 (application approved) 
C6994 
Erection of 2 detached dwellinghouses North-West of Lagarie house. 
28.06.1983 (outline) (application approved) 
C8400 
Erection of a 2 storey detached dwellinghouse with double integral garage to the East of Lagarie
House.
07.04.1989 (outline) (application refused / appeal dismissed) 
P/PPA/SH/137 
Appeal of planning refusal reference C8400.
05.02.1990 (appeal dismissed) 
11/00528/PP
Erection of 5 flats and car ports
07.11.2011 (application withdrawn) 
19/02162/PP
Erection of 2 dwellinghouses and garages
14.02.2020 (application withdrawn)   
20/01382/PP
Erection of dwellinghouse with integral garage and formation of new vehicular access
16.08.2023 (application withdrawn)   
20/01383/LIB
Formation of new vehicular access through the existing stone wall
16.08.2023 (application withdrawn)   
23/01502/PP
Erection of dwellinghouse and formation of new vehicular access
23.05.2024 (application approved)   
23/01503/LIB
Formation of new vehicular access through the existing stone wall
23.05.2024 (application approved)   
(E) PUBLICITY:   
Advert Type: Listed Building/Conservation Advert               Expiry Date: 15.05.2025 
(F) REPRESENTATIONS:   
(i) Representations received from: 
Objection 
M Edwards Lagarie Cottage Mor Torwoodhill Road Rhu Argyll And Bute 14.10.25
Irene Edwards Lagarie Cottage Torwoodhill Road Rhu Argyll And Bute 14.10.25
P Cassidy Auchenlea Lodge Torwoodhill Road Rhu G84 8LF 14.10.2025
G Grant Auchenlea Lodge Torwoodhill Road Rhu G84 8LF 14.10.2025

Page 4

Jim Crawford Garden Cottage Lagarie Torwoodhill Road Rhu Argyll And Bute
09.05.2025, 12.05.25, 21.07.25, 04.08.25, 06.10.25, 07.10.25, 24.10.25, 07.11.25,
10.11.25
Irene Crawford Garden Cottage Lagarie Torwoodhill Road Rhu Argyll And Bute
09.05.2025, 24.10.25
Dr Krystina Crawford 736 Crow Road, Anniesland, Glasgow, G13 1NF 13.05.2025
Annamarie Kelly 3 Lagarie House Torwoodhill Road Rhu Argyll And Bute 03.10.2025,
24.10.25
Sloan Kelly Flat 3 Lagarie House Torwoodhill Road Rhu 09.10.2025, 24.10.25
Mr Doolen Doonpark Torwoodhill Road Rhu Argyll And Bute 09.10.2025
V Doolen Doonpark Torwoodhill Road Rhu Argyll And Bute 09.10.2025
Moira Burke Lagarie Lodge Torwoodhill Road Rhu Argyll And Bute 09.10.2025,
24.10.25
Russell Burke Lagarie Lodge Torwoodhill Road Rhu Argyll And Bute 09.10.2025,
24.10.25
Kate Austin Flat 2 Lagarie House Torwoodhill Road Rhu 09.10.2025, 24.10.25
Ron McKechnie Flat 1 Lagarie House Torwoodhill Road Rhu 09.10.2025, 24.10.25
Anne McKechnie Flat 1 Lagarie House Torwoodhill Road Rhu 09.10.2025, 24.10.25
Duncan McGuire Flat 4 Lagarie House Torwoodhill Road Rhu 09.10.2025, 24.10.25
Sandra McGuire Flat 4 Lagarie House Torwoodhill Road Rhu 09.10.2025, 24.10.25 
Representations are published in full on the planning application file and are available to view
via the Public Access section of the Council’s website. 
(ii) Summary of issues raised: 
• Note that no public notice has been erected at the application site. 
Comment; Officers can confirm that the required notice was erected on the 
22.05.2025. 
• Note that a Listed Building Consent application is also required. 
Comment; Officers confirm that a Listed Building Consent application is not
required in this instance as the only development requiring Listed Building
Consent is the alterations to the boundary wall to form the new vehicular
access, however, these works currently benefit from Listed Building Consent
approval under approval reference; 23/01503/LIB. No changes are proposed
under this application that deviate from this approval therefore a separate
listed building consent application is not required at this time. 
• Concern that the Design and Conservation Officer has not been consulted on
the application. 
Comment; Officers confirm that the Design and Conservation Officer has been
consulted on this application. 
• Concern that no tree survey has been submitted. 
Comment; officers can confirm that a tree survey has been submitted. 
• Note that no consultation has been requested from the community council. 
Comment; The authority is only required to consult with the community council
on applications where the proposed development is likely to affect the amenity
of the area. In this instance officers do not consider that the proposed
development affects the amenity of the area (see assessment below).

Page 5

Furthermore, the community council  can choose to submit a consultee
response, however, they have not in this instance. 
• Note that the application site is the front garden of the neighbouring listed
property. 
Comment; the application site no longer forms part of the neighbouring listed
properties curtilage due to the passage of time the lawn area has been
separated by vegetation and is not used in association with the main house. 
• Concern in terms of existing drainage pipes (foul & surface water) running
through the site. 
Comment; This is noted, however, this is a private civil matter. It is also
confirmed that a standards SUDS condition will be added to this application
with regards to surface water on the application site. 
• Concern in regard to the proposed parking positioning in terms of the potential
negative effects on the access to the neighbouring listed property. 
Comment; this is noted and it is considered that with the appropriate screening
(as included by condition) this is acceptable. It is further noted that the
neighbouring property Lagarie Lodge has an access onto the shared access
to the neighbouring listed property and currently has a parking area to the
rear. 
• Concern in regard to proposed tree removal as the site forms part of a TPO
area. 
Comment; please see assessment below. 
• Concern that the proposals do not take into account SUDS. 
Comment:  A detailed SUDS scheme will be conditioned. 
• Note that a transport assessment / noise assessment should be provided in
regard to the new vehicular access. 
Comment; the area roads manager has been consulted on the proposals
and has confirmed that they have no objections subject to conditions. There
is no requirement for a transport/noise assessment in this instance given the
small scale nature of the proposals. 
• Note that daylight / sunlight calculations should be provided. 
Comment; this is noted, however, the above calculations are not a
requirement and in this instance officers consider that there are no negative
effects on the daylight / sunlight to neighbouring properties arising from the
proposed development. 
• Note that an ecology / habitat survey should be provided. 
Comment; it is confirmed that a preliminary ecological assessment has been
submitted with regards to the application site. 
• Note that the bat scoping survey has not been completed by a qualified
ecologist in line with the bio-diversity officer’s consultation response.

Page 6

Comment; The Local Biodiversity Officer has confirmed that the submitted
bat scoping survey report has been undertaken by an appropriately qualified
person. 
• Note that no details of the proposed bio-diversity enhancement measures as
requested by the bio-diversity officer have been submitted. 
Comment; It is confirmed that the proposed bio-diversity enhancement
measures have been included within the submitted preliminary ecological
assessment. 
• Note that no details on the bio-diversity value of the trees on site have been
submitted as per the request of the bio-diversity officer. 
Comment; this is noted, however, it is confirmed that the council’s
biodiversity officer has provided an updated response which is detailed in
assessment below. 
• Note that no detail drawings have been submitted in regards to the proposed
access alterations. 
Comment; the access alterations are shown on the proposed site plan,
which notes ‘New access, visibility splays and wall to be as per previous
approval ref: 23/01502/PP….’ 
• Concern with regards to the suitability of the landscaping proposals. 
Comment; it is recommended that a planning condition is added to any
approval requiring the submission and approval of a detailed landscaping
scheme. 
• Note that the revised design submitted should have required a fresh
planning application as the changes are significant given the increase in size
and height. It was previously a two low level pitched roofs at the same pitch
angle and now it is a single roof spanning the full width of the proposed
house with significant increase in roof height. The new house type in plan,
section, elevations and location on site bearing no resemblance to the initial
building proposal. 
Comment; it is confirmed that it is the view of officers that the design
amendments are considered to be non-material and therefore a fresh
planning application is not required in this instance. The amendments are
not significant as the footprint has only increased by 25sqm, the positioning
is slightly closer to the main house but not by much and the ridge has
increased but it is marginal and the house remains single storey. 
• Note that the public should be notified of the revised design proposals. 
Comment; it is confirmed that there is no requirement to re-notify interested
parties as the design amendments are considered to be non-material,
however, officers have exercised discretion in this instance and have re-
notified all interested parties. 
• Note that the scale of the proposed house is inappropriate in the context. 
Comment; please see assessment below.

Page 7

• Comment that the historical approvals; C6986 for the conversion of Lagarie
House from children's home to from 4 flats, including the erection of 4
detached dwellinghouses to the West of Lagarie House (during the
determination process this was reduced to the erection of 3 dwellinghouses
to the West in lieu of the initial 4 applied for) and C6994 for the erection of 2
detached dwellinghouses to the North-West of Lagarie House, there was a
planning condition on these approvals that stated ‘there shall be no direct
access, vehicular or pedestrian on to the A814. Therefore, the proposed
access under this application should not be allowed as the previous
condition is legally binding and the subsequently the recent approval on the
site has no legal means of access and is thus invalid. 
Comment; This condition was in relation to previous planning approvals
(references; C6986 & C6994) and was complied with. It is not a condition
binding on all future developments for the overall site.  The 5 detached
dwellinghouses approved under the aforementioned applications are located
to the West and North-West of Lagarie House, this application site is located
to the East of Lagarie House. This application is in relation to a different
development; therefore, officers will access the suitability of the proposed
access onto the A814 under the current development plan and all material
planning considerations. It is further noted the area roads manager was
consulted on the current application and the proposed vehicular access on
to the A814 and has noted that they have no objections to this subject to
recommended planning conditions. 
• Concern about potential impacts on wildlife. 
Comment:  please see assessment below. 
• Concern about forming a new access through a listed wall. 
Comment; please see assessment below. 
• Concern that the removal of trees or bushes would create greater traffic
noise for neighbouring properties. 
Comment; this is noted however this is considered to be minimal.   
• Concern that the proposals could affect bats. 
Comment; the applicants have submitted a potential bat roost assessment.
This assessment concludes ‘Having regard to the distribution of species,
habitat, potential roost features, suitability and importance of any of these
and signs of bat activity the risk of bat roosts or bats being disturbed is
negligible or low and roosting can reasonably be ruled out’. Furthermore, the
submitted preliminary ecological assessment also makes reference to bats
and concludes ‘No further survey is required unless plans for tree felling are
changed at which point a pre-felling check should be undertaken’. 
• Note that a previous application for a single dwelling on the proposal site
was refused in 1989 and also refused at the subsequent appeal in 1990 and
therefore this application should also be refused. 
Comment; this is noted however, it is confirmed that the previous decision
simply confirms that the principle of development was determined to be

Page 8

unacceptable having regard to the detail of the proposal, development plan
policy and circumstances at the point in time that the appeal decision was
made. A substantial period of time has elapsed since the appeal decision
and within this time the relevant development plan and other relevant policy
considerations have been superseded by subsequent iterations of the Local
Development Plan and National Policy and Guidance and accordingly it is
necessary for any decision on the current application to be assessed against
these revised provisions and in relation to the current circumstances of the
site and its surrounds. It should also be noted that the most recent
application for this site was approved in May 2024 for a single house
(reference; 23/01502/PP). 
• Concern about the removal of the mature rhododendron hedge. 
Comment; rhododendron ponticum is an invasive species and the removal of
this would benefit the biodiversity on the site. 
• Concern that SEPA / the flood risk advisors have not been consulted on the
proposal with regards to potential flooding, surface water drainage and
existing below ground drains. 
Comment; As the site is not within the indicative flood risk zone (coastal /
surface / river) as per the SEPA maps, the trigger for consulting SEPA / the
flood risk consultants as a statutory consultee has not been met, therefore,
there is no need to consult as the development is not considered to be at
risk of flooding. With regards to surface water drainage, this will be added as
a planning condition and to confirm SEPA / the flood risk consultants do not
require to be consulted with regard to surface water. Lastly the possible
presence of existing below ground drains within the site are a private civil
matter and not a matter for SEPA or the flood risk consultants, it is also
noted that Scottish Water have noted no objections and have not flagged
that they have any Scottish Water assets in proximately to the site within
their consultation response.   
• Note that a flood risk assessment is required. 
Comment; There is no requirement for a flood risk assessment as the site is
not considered to be at risk of flooding (see comment above). 
• Note that no site levels have been shown and there is a possibility that the
finished floor levels could be lower than the SEPA required levels on other
applications. 
Comment; The site is not considered to be at risk of flooding and therefore
SEPA have not been consulted. 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report:  No

Page 9

(ii) An Appropriate Assessment under the
Conservation (Natural Habitats) Regulations 1994: 
No  
(iii) A Design or Design/Access statement:
A planning supporting statement has been submitted
which covers the following topics; 
• Site Context and Surroundings
• Accessibility
• Design
• Policy overview 
The statement concludes the following: The
development will improve on the sense of identity and
character of the area of the village of Rhu. The potential
redevelopment of the site for residential purposes is of
a scale and nature that will positively compliment
surrounding properties within Rhu. In conclusion, taking
into consideration Argyle and Bute’s Local Development
Plan it is our view that the proposed development is
acceptable, and the proposed scale, design and
massing of the residential development complies with
policy criteria as set out in the LDP2 and NPF4. The
above information provides sufficient evidence and
justification to show a compliance to Policy related to
proposals of this nature. 
Yes  
(iv) Sustainability Checklists (with reference to the
requirements of LDP2 Policy 04) 
TN06 Sustainability Checklist
TN07 Sustainable Buildings Checklist
Yes
Yes  
(v) A report on the impact of the proposed development
eg. Retail impact, transport impact, noise impact,
flood risk, drainage impact etc: 
Planning Further Assessment (Allison Architecture,
May 2025). This report provides an assessment
demonstrating the acceptability of design in regards
to the adjacent listed building as per the
requirements of NPF 4 Policy 7. 
Preliminary Ecological Assessment (JDC Ecology
Limited, July 2025) The assessment was
undertaken on the 25th of June 2025.  The
assessment provides an overview of the area as
regards the main habitat types and the presence or 
likely presence of protected or notable species and
Invasive Non-Native Species (INNS).  The
assessment concludes that the land as surveyed
would be regarded overall as of moderate
biodiversity value, including both the woodland and
grasslands. However, the woodland requires
suitable management to resolve current issues,
which includes an established cover of
Rhododendron, and general lack of management to
optimise woodland structure and diversity. 
Yes

Page 10

Tree Survey Report (Julian A Morris, June 2025)
The survey was undertaken in May 2025. Each tree
over 75mm diameter on site was recorded. Around
50 trees on and around the site were recorded,
measured and categorised individually. The survey
did not identify the presence of individual veteran or
ancient trees on or around the site. Root protection
areas were identified for all the trees. 
Bat Scoping Survey Report (Julian A Morris, June
2025) The nature of the survey was to undertake a
preliminary character assessment to ascertain
whether the site has potential to support roosting
and/or foraging bats and identify the species of bat
and any trees and their potential for roost feature
and signs of bat use. The survey was carried out in
May 2025. The stone wall was checked for cavities
or unbound rubble interiors and no signs of this was
found. All trees were checked for holes, cavities and
hollows and no sign of potential roost features were
identified on any of the trees.   
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   No   
(I) Has a Direction been issued by Scottish Ministers in terms
of Regulation 30, 31 or 32:  
No    
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account in
assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 5 – Soils
NPF4 Policy 6 – Forestry, Woodland and Trees
NPF4 Policy 7 – Historic Assets and Places
NPF4 Policy 13 – Sustainable Transport 
Liveable Places
NPF4 Policy 14 – Design, Quality and Place

Page 11

NPF4 Policy 15 – Local Living and 20 Minute Neighbourhoods
NPF4 Policy 16 – Quality Homes 
Argyll and Bute Local Development Plan 2 (Adopted 2024) 
Spatial and Settlement Strategy
Policy 01 – Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places
Policy 05 – Design and Placemaking
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design – All Development
Policy 15 – Protection, Conservation and Enhancement of Our Historic Environment
Policy 16 – Listed Buildings
Policy 17 – Conservation Areas 
Connected Places
Policy 34 – Electric Vehicle Charging Points
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
Policy 36 – New Private Accesses
Policy 39 – Construction Standards for Private Accesses
Policy 40 – Vehicle Parking Provision 
Sustainable Communities
Policy 61 – Sustainable Urban Drainage Systems (SUDS)
Policy 63 – Waste Related Development and Waste Management 
Homes for People
Policy 66 – New Residential Development on Non-Allocated Housing Sites within
Settlement Areas 
High Quality Environment
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 77 – Forestry, Woodland and Trees
Policy 79 – Protection of Soil and Peat Resources 
(ii)  List of all other material planning considerations taken into account in the
assessment of the application, having due regard to Annex A of Circular
3/2013. 
• Third Party Representations
• Consultation Reponses
• Planning History
• ABC Technical Note – Biodiversity (Feb 2017)
• TN06 Sustainability Technical Note and Checklist (Oct. 2023)
• TN07 Sustainable Buildings Technical Note and Checklist (Oct. 2023)
• ABC Housing Needs and Demand Assessment
• ABC Housing Emergency Statement
• SEPA Standing Guidance for Development Management (Dec. 2022)
• Historic Environment Scotland – HEPS
• Historic Environment Scotland – Managing Change in The Historic Environment - various

Page 12

(K) Is the proposal a Schedule 2 Development not requiring an
Environmental Impact Assessment:  
No    
(L) Has the application been the subject of statutory pre-
application consultation (PAC):  
No 
(M) Does the Council have an interest in the site:   No 
(N) Requirement for a pre-determination hearing: 
Please note that officers are not recommending a pre-determination
hearing as it is considered that there would be no added value in this
as all material planning considerations have been taken into account
within this report including; consultee responses, third party
representations and planning history etc. 
No 
(O)(i) Key Constraints/Designations Affected by the Development: 
Conservation Area  
Setting of Listed Buildings -  Lagarie House (Category B) and Ardencaple Hotel (Category A) 
Tree Preservation Order - TPO 26 - Lagarie Children's Home, Rhu (confirmed 1984) 
(O)(ii) Soils
Agricultural Land Classification:  Built Up Area 
Peatland/Carbon Rich Soils Classification: N/A 
Peat Depth Classification: N/A 
Does the development relate to croft land? No
Would the development restrict access to croft or better
quality agricultural land?
N/A
Would the development result in fragmentation of croft
/ better quality agricultural land?
N/A 
(O)(iii) Woodland  
Will the proposal result in loss of trees/woodland?  Yes
Does the proposal include any replacement or
compensatory planting?
Yes 
(O)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application  Greenfield 
ABC LDP2 Settlement Strategy Settlement Area

Page 13

ABC LDP2 Allocations/PDAs/AFAs etc: N/A 
(P) Summary assessment and summary of determining issues and material
considerations: 
The proposed development relates to the erection of a 2 bed detached dwellinghouse and
formation of new vehicular access. 
The site is located within the settlement area of Rhu as identified in the adopted Argyll and
Bute Local Development Plan (LDP2) wherein Policy 01 (Settlement Areas) notes that
development will normally be acceptable on a non-brownfield site where, the proposal is
considered acceptable in relation to the overall land supply, it is compatible with surrounding
uses, it is of an appropriate scale and fit for the size of settlement in which it is proposed;
and respects the character and appearance of the surrounding townscape in terms of
density, scale, massing, design, external finishes and access arrangements. 
The proposal lies within the Rhu Conservation Area and the residential property adjacent to
the West, “Lagarie House” which is a Category “B” listed building. Additionally, within the
vicinity is the Category “A” listed “Ardencaple Hotel”. As such, the impact of the proposed
development on the historic environment is a determining factor. In addition, the proposed
development has been assessed more generally with regard to siting, scale, massing form,
and detailed design in relation to the aim of respecting and reflecting the visual character of
the existing built development pattern; and protecting local residential amenity. 
The site is covered by an area Tree Preservation Order (TPO), however, the site is not
located within or in proximity to any nature conservation sites, nor does it lie within
NatureScot Ancient Woodland Inventory. However, any impact upon the natural
environment in relation to biodiversity and impact on trees/woodland requires to be assessed
in connection with the proposal. 
The proposal has also been assessed with regard to the satisfactory provision of services
infrastructure provision. 
A fully detailed assessment with reference to the above determining factors, and all other
material considerations, including planning history and material planning issues raised by
third party representations (not addressed above) are set out in the Appendix A to this report. 
Having regard to all material considerations it is considered that the proposal is acceptable. 
(Q) Is the proposal consistent with the Development Plan:  Yes 
(R) Reasons why Planning Permission or Planning Permission in Principle Should be
Granted: 
The proposal is considered to be consistent with the relevant provisions of the
Development Plan, and there are no other material considerations of sufficient
significance to indicate that it would be appropriate to withhold planning permission
having regard to s25 of the Act.

Page 14

(S) Reasoned justification for a departure to the provisions of the Development Plan: 
N/A 
(T) Need for notification to Scottish Ministers or Historic
Environment Scotland:  
No 
Author of Report:  Emma Jane Date:  05.11.2025 
Reviewing Officer: Kirsty Sweeney Date: 11.11.2025 
Fergus Murray
Head of Development & Economic Growth

Page 15

CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 25/00576/PP 
Standard Time Limit Condition  (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions  
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 07.04.25; supporting information and, the approved drawings listed
in the table below unless the prior written approval of the planning authority is obtained for
an amendment to the approved details under Section 64 of the Town and Country Planning
(Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan 1 of 13 A 9th April 2025
Site Plan as
Existing
2 of 13 - 8th April 2025
Site Sections A-A +
B-B as existing
3 of 13 A 5th  September
2025
Site Sections C-C +
D-D as existing
4 of 13 A 5th  September
2025
Site Plan as
proposed
5 of 13 A 5th  September
2025
Site Sections A-A +
B-B as proposed
6 of 13 A 5th  September
2025
Site Sections C-C +
D-D as proposed
7 of 13 A 5th  September
2025
Ground Floor Plan
as proposed
8 of 13  A 5th  September
2025
South West
Elevation
9 of 13 A 5th  September
2025
North East
Elevation as
proposed
10 of 13 - 5th  September
2025
South East
Elevation as
proposed
11 of 13 - 5th  September
2025
North West
Elevation as
proposed
12 of 13 A 5th  September
2025
Roof Plan as
proposed 
13 of 13 A 7th November 2025 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.  
2. Scottish Water – Notwithstanding Condition 1, Prior to the commencement of
development, the developer shall submit written evidence to the Planning Authority that an
agreement with Scottish Water is in place for the connection of the proposed development
to the public water supply and wastewater sewage network. 
Reason: In the interests of public health and to ensure the availability of an adequate water
supply to serve the proposed development.

Page 16

3.  Sustainable Urban Drainage – Notwithstanding Condition 1, details of a sustainable
urban drainage system compliant with the guidance set out in CIRIA’s SuDS Manual C753
must be submitted to and approved in writing by the planning authority prior to the
commencement of development. The surface water drainage shall be operational prior to
the development being brought into use and shall be maintained as such thereafter. 
Reason: To ensure adequate surface water drainage is implemented to prevent flooding
elsewhere. 
4. Landscape - Notwithstanding Condition 1, Prior to the commencement of development,
full details of both hard and soft landscape works to be carried out at the site shall be
submitted to and approved in writing by the local planning authority in the form of a detailed
landscaping plan. The approved hard landscaping works shall be carried out prior to first
occupation of the development and the soft landscaping works / replacement tree planting
within the first planting season following first occupation of the development. The details
submitted shall include: 
- details of the proposed hard surfacing (including proposed materials);
- details of proposed boundary treatments; 
- details of proposed soft landscaping;
- details of the replacement tree planting (location, size and species); 
- programme for completion and subsequent on-going maintenance. 
Reason: In the interests of biodiversity and the natural environment. 
5. Biodiversity Enhancement - Notwithstanding Condition 1, Prior to the commencement of
development, a revised biodiversity statement based on the Preliminary Ecological
Assessment table 6  shall be submitted to and approved in writing by the Planning
Authority. The statement shall demonstrate how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits will be
implemented and maintained for the lifetime of the development. 
All physical biodiversity enhancement measures (bird nesting boxes, ‘swift bricks’, wildlife
ponds, bat and insect boxes, hedgehog homes etc) as set out in the Preliminary Ecological
Assessment table 6 and also include the retention of any felled native species as deadwood
shall be implemented in full before the development hereby approved is first brought into
use. 
All biodiversity enhancement measures consisting of new or enhanced planting shall be
undertaken either in accordance with the approved scheme of implementation or within the
next available planting season following the development first being brought into use. 
Reason: To comply with the requirements of NPF4 Policy 3 and the recommendations of
the council biodiversity officer. 
6. Trees – Notwithstanding Condition 1, Prior to the commencement of development, a tree
protection plan shall be submitted to and approved in writing by the authority. Thereafter,
all retained trees on site shall be protected at all times during construction in accordance
with the British Standard; BS 5837:2012 (Trees in relation to design, demolition and
construction – Recommendations). 
Reason: The landscape features to be protected are important to the appearance and
character of the site and the surrounding area and are required to successfully integrate
the proposal with its surroundings. 
7. Pre-works checks - Notwithstanding Condition 1, Prior to the commencement of
development, pre-works checks for the presence of bats, breeding birds, hibernating

Page 17

hedgehogs and amphibians on site; shall be carried out by an appropriately qualified
person. In circumstances where species of interest are identified as being present, or at
risk from construction works, a statement shall be submitted to and approved by the
authority in writing to provide suggested avoidance and or mitigation measures, including
timing constraints, to address such presence or risk. 
Reason: In order to establish that the circumstances of the site have not changed
significantly between approval and implementation of the development for the purpose of
protecting natural heritage assets in the interest of nature conservation. 
8. Invasive Non-Native Species Eradication Plan - Notwithstanding Condition 1, Prior to
the commencement of development, a non-native species eradication plan (in accordance
with the ‘Code of Practice with regard to non-native species;  
http://www.scotland.gov.uk/Publications/2012/08/7367/0’) for the non-native species
present on site shall be submitted to and approved in writing by the authority. 
Reason: In the interest of nature conservation. 
9. External Materials - Notwithstanding Condition 1, Prior to the commencement of
development, samples of the proposed materials to be used for the external finishes of the
development hereby approved shall be submitted to and approved in writing by the
Planning Authority. 
Reason: In the interests of visual amenity and in order to integrate the proposal with its
surroundings. 
10. Sustainable Design – Notwithstanding Condition 1, Prior to the commencement of
development, details of the on-site micro renewable energy to provide heat or
electricity to the property and details of the use of the final materials – including
details of any re-cycled materials or local sourced materials and their embodied
energy for each materials, shall first be submitted and approved in writing by the
Local Planning Authority. Thereafter the approved micro renewables and materials
must be used in the development hereby approved. 
Reason: In order to ensure compliance with LDP2 Policy 09 and to ensure the
building is being as energy efficient as possible in order to respond to climate change. 
11. Quality homes – Notwithstanding Condition 1, Prior to the commencement of
development, details of the proposed timescale for completion of the approved
development have been submitted to and approved by the Planning Authority. Thereafter,
the development shall be implemented in accordance with the duly approved timescale for
completion unless an alternative timescale for completion is otherwise agreed in writing
with the Planning Authority. 
Reason: In order to comply with the requirements of NPF4 Policy 16F. 
12. Potential sources of nuisance – Notwithstanding Condition 1, Prior to the
commencement of development, identification and assessment of all potential sources of
nuisance, including noise/ vibration, dust, and any temporary lighting provided, which may
cause disturbance to nearby residents during the demolition / construction process shall
be undertaken by the applicant. This should include consideration of intended hours of
operation, movement of vehicles, use of plant and storage of equipment and materials on
site. 
For all potential sources of nuisance, the applicant will be required to provide a 
management plan with details of suitable control measures to be put in place so as to 
ensure that construction does not cause loss of amenity to local residents and/or 
statutory nuisance. The management plan must be submitted to and approved by the 
Planning Authority and thereafter complied with.

Page 18

Reason: In order to avoid sources of nuisance in the interest of amenity. 
13. Parking and Turning – Notwithstanding Condition 1, The parking and turning area shall
be laid out in accordance with the details shown on the approved  drawing reference; 00-
003 REV. A prior to the development first being occupied and shall thereafter be maintained
clear of obstruction for the parking and manoeuvring of vehicles. 
Reason: In the interest of road safety. 
14. Junction with public road - Notwithstanding Condition 1, the proposed access shall be
formed in accordance with the Council’s Roads Standard Detail Drawing SD 08/005 Rev.
B (as laid out on approved drawing reference; 00-003 REV. A) incorporating vehicular
visibility splays of 75 x 2.4 x 1.05 metres measured from the edge of the carriageway and
pedestrian visibility splays of 2.4 m x 2.4 x 0.9 metres measured from the rear of the
footway. Thereafter the driveway shall be formed in accordance with the Council’s Roads
Standard Detail Drawing SD 08/002 Rev. B, providing a minimum driveway access width
of 5.5m for the first 10m, reducing to no less than 3.7m thereafter (3.5m where not bound
by walls). The access shall be surfaced with a bound material for the first 5m. Gradients of
the access drive must be no greater than 5% over the first 5.0m and thereafter must not
exceed 12.5%. Drainage shall be achieved within the boundary such that no water shall
discharge onto the public carriageway. Prior to the commencement of development the
access hereby approved shall be formed to at least base course standard and the visibility
splays shall be cleared of all obstructions such that nothing shall disrupt the required
visibility spays. The final wearing surface on the access shall be completed prior to the
development first being occupied and the visibility splays shall thereafter be maintained
clear of all obstructions in perpetuity. 
Reason: In the interests of road safety.

Page 19

ADDITIONAL NOTES TO APPLICANT 
• LDP2 Policy 34 - Electric Vehicle Charging states that for all new build houses with private
off street parking dedicated cable ducting connecting each private residential parking space
to the nearest electricity supply connection point capable of supporting the installation of a
7-kilowatt EV charging point shall be installed. This has since been superseded by a new
Building Regulations standard (ref 7.2 of Technical Handbook Jan 2025 edition) which
requires a minimum of one electric vehicle charge point socket with an output rating of not
less than 7 kW to be provided adjacent to the parking space. As it is controlled via Building
Standard then this has not been subject to a condition. 
• A roads opening permit (Section 56) must be obtained prior to any works on, or alongside
the existing adopted carriageway. 
• It is noted that no gates have been included within the application, if new access gates are
proposed these will likely require a further planning application. Furthermore, any access
gates would need to be sited at least 6 metres from the edge of the carriageway to allow an
entering vehicle to stop clear of the carriageway when the gates are closed. Any access
gates must be hung so that they do not open towards the carriageway.

Page 20

COMMITTEE REPORT
APPENDIX A – RELATIVE TO APPLICATION NUMBER:  25/00576/PP 
PLANNING LAND USE AND POLICY ASSESSMENT 
1. Settlement Strategy 
1.1. The site is located within the settlement area of Rhu as identified in the adopted Argyll and Bute
Local Development Plan (LDP2) wherein Policy 01 (Settlement Areas) notes that development
will normally be acceptable on a non-brownfield site where the proposal is considered
acceptable in relation to the overall land supply for the proposed use, and it is compatible with
surrounding uses including but not exclusively; providing access, service areas, infrastructure
for existing, proposed or potential future development, and it is of an appropriate scale and fit
for the size of settlement in which it is proposed; and respects the character and appearance of
the surrounding townscape in terms of density, scale, massing, design, external finishes and
access arrangements; and lastly that it complies with all relevant LDP2 policies. 
1.2. LDP2 Policy 66 (New Residential development on non–allocated housing sites within Settlement
Areas) requires that new buildings will only be permitted where: 
a) the layout, density, plot ratio, scale, form and materials of any proposed development do not
detract from the character of the surrounding buildings and the local area; 
b) it does not affect the privacy and amenity of existing and proposed properties; 
c) the site provides a suitable residential environment; 
d) it provides appropriate private and public open space and; 
e) an appropriate standard of access to and parking for vehicles associated with the
development is provided, it does not result in the loss of any existing parking spaces, and that
traffic generated as a result of the development is capable of being accommodated within the
capacity of the existing road network surrounding the development; 
f) it is not detrimental to the overall housing land supply of the LDP2. 
The proposals must also demonstrate that they meet the tests laid down in National Planning
Framework 4 Policy 16 (Quality homes) criterion f). 
1.3. NPF4 Policy 16 (f) supports new homes on land not allocated for housing where the proposal is
supported by an agreed timescale for build-out, it is otherwise consistent with the plan spatial
strategy and other relevant policies including local living and the proposal is for smaller scale
opportunity within an existing settlement. 
1.4. NPF4 Policy 1 (Tackling the climate and nature crises) requires that significant weight be given
the global climate and nature crises when considering new development. Policy 2 (Climate
mitigation and adaptation) seeks to encourage, promote and facilitate development that
minimises emissions and adapts to impacts on climate change. NPF 4 Policy 5 (Soils) aims to
protect locally, regionally, national and internationally valued soils. 
1.5. The development is considered small-scale as it for the erection of one dwelling. It is located
within an identified settlement with access to community facilities and public transport networks,
consistent with NPF 4 Policy 15 (Local Living and 20 minute Neighbourhoods), and is compatible
with the provisions of NPF 4 Policy 1 in terms of addressing the Climate Crisis in principle. The
site is located within an established residential area and will not impact upon soil that has
material value. It is recommended that any planning permission will be subject to a model
planning condition. 
1.6. On the above basis, it is considered that there is a general presumption in favour of the principle
of this proposed development in terms of its location, nature and scale when assessed against
the policy provisions relating to the LDP2 and relevant NPF4 Policies.

Page 21

2. Location, Nature and Design of Proposed Development 
2.1. The application site measures approximately 3254sqm and is bounded to the North by the
existing access to neighbouring Lagarie House, to the East by the boundary of Lagarie Lodge,
to the West by the boundary of Lagarie House and to the South by an existing stone wall that
separates the site from the A814. It is proposed to create the access to the site through this
stone wall which is considered to be listed by way of curtilage listing relative to Lagarie House
(category B listed), there is a extant listed building consent for the alterations to this wall
(reference; 23/01503/LIB). There is an established belt of trees and large shrubs along the
South, East and West site boundaries separating it from the grounds of Lagarie House and the
A814. To the Southern boundary of the site and also extending up the Western boundary there
is a large rhododendron hedge. The site slopes gently upwards from South to North. 
2.2. The application site formerly formed part of Lagarie House’s curtilage and was part of the main
House’s lawn. Lagarie House was however, subdivided into flats historically and its curtilage
was divided into plots. 5no. Dwellinghouses have subsequently been built to the North-West
and West of the Lagarie House as well as Lagarie Lodge which was built to the East. This plot
is located in between Lagarie House, the original main house and Lagarie Lodge (an infill house
built in the mid-1900’s) and has been separated visually from the main house by vegetation. It
is therefore not considered that the site forms part of the curtilage of Lagarie House. 
2.3. The proposed house is to be sited centrally within the plot from West to East and from South to
North it is to be sited such that the front elevation is in line with the front elevation of both Lagarie
House and Lagarie Lodge. The proposed access from the A814 will be formed through the
existing stone wall on the Southern boundary and will be located centrally on this boundary, with
driveway extending to the West of the of the proposed house and to the rear where a turning
area and parking for 3no. vehicles is proposed. The proposed dwellinghouse will have 2
bedrooms with a footprint of approximately 160sqm, a maximum eaves height of 2.5 metres and
a maximum ridge height of approximately 5 metres. The proposed house is traditional in
massing but utilises contemporary design materials and detailing which complements the
architectural character of the surrounding area. The proposed house uses single storey massing
which is in keeping with the adjacent Lagarie Lodge. The massing of the proposed house is
made up of 2 intersecting gable forms with the projecting gable element to the principal ‘street
facing’ elevation being mainly glazed to emphasis this principal elevation a central chimney is
also proposed which will provide an attractive roofscape. A contemporary pallet of materials is
proposed to respect and enhance the characteristics of the surrounding properties and wider
conservation area. This will include; slate roof, dark grey polyester powder coated aluminium
facias and rain water goods, off-white wet dash render, beige-grey polyester powder coated
aluminium windows and doors and lastly a vertical western red cedar cladding to the inset porch.
There would also be integrated photo voltaic panels installed to the south facing roof slopes. 
2.4. It is noted that a revised house design was submitted during the determination process. Further
details and reasoning behind this will be proved in section 4 below. 
2.5. NPF4 Policy 14 (Design, quality and place) requires that development proposals be designed
to improve the quality of an area; and, offers support to development that achieve the six
qualities of Health; Pleasant; Connected; Distinctive; Sustainable; and, Adaptable. Development
that is poorly designed, detrimental to the amenities of surrounding areas or inconsistent with
the aforementioned six qualities will not be supported. 
2.6. NPF4 Policy 14 is closely aligned with the provisions of LDP2 Policy 04 (Sustainable
Development) which requires that developers to demonstrate certain sustainable development
principles and also Policy 05 (Design and Placemaking) which requires developers to comply
with certain placemaking criteria including; compatibility with surrounding land uses, make use
of existing infrastructure, respect site topography, improve connectivity, incorporate green and
blue infrastructure, adopting design that respects and complements its surroundings, siting and
design should respond to the natural environment and the design should be sustainable in terms
of materials and construction and should consider future adaptability, and climate change
mitigation measures.

Page 22

2.7. LDP2 Policy 08 (Sustainable Siting) requires that development integrates into the landscape or
existing built form to minimise detrimental effects on the environment, and the siting of a
development should take into account the character of the area in terms of its settlement pattern,
layout and density; development should be carefully sited to avoid overshadowing or
overlooking of itself or other properties; development should be positioned within the landscape
to make the best use of solar gain, natural ventilation and shelter from the elements;,
development should be sited within easy access of existing infrastructure and services; and any
ancillary development such as parking and turning areas, should be sensitively designed and
sited. LDP2 Policy 09 (Sustainable Design) requires that development proposals demonstrate
consideration of renewable energy and sustainable design & construction methods. LDP2 Policy
10 (Design: All Development) requires demonstration of an appropriate response to the
development site and wider context, acknowledgement of the scale / massing of nearby
buildings and use materials that are harmonious with the context. 
2.8. Having regard to the built development pattern and densities of the local area, it is noted that
there is a range of scale and design of houses, and whilst the overall pattern of built development
is very spacious, there is a range of plot ratios. The ratio of built development to open curtilage
in the case of this proposal is spacious in nature and reflects the plot ratio of the adjacent Lagarie
Lodge. The scale of the house is comparably small, and it is considered that the siting, form,
massing and material finishes will respect and reflect the existing character of the built
environment and compliment the visual character of the area in accordance with the relevant
provisions of NPF4 and LDP2. 
2.9. The proposed house will be screened from Lagarie House and Lagarie Lodge by existing natural
boundary features and the planting of additional trees to the North will screen the proposals
including the rear car parking area from Lagarie cottage, in conjunction with the proposed
orientation of windows and separation distances will mean that there will be no material loss of
residential amenity to the occupiers of these properties by reason of overlooking. It is also
considered that the proposed siting and scale of the proposals there will be no negative effects
on the daylight / sunlight to neighbouring properties arising from the development. On this basis,
Officers area satisfied that the proposed development will not have a material impact upon the
residential amenities of nearby properties in accordance with the relevant provisions of NPF4
and LDP2. 
2.10. In relation to sustainability, the application has included the submission of the Sustainability
Checklist and the Sustainable Buildings Checklist in response to LDP2 Policy 09. The
application responds to the sustainability criteria as follows: 
• The site is located in accordance with the LDP2 settlement and spatial strategy;
• It is well connected in terms of active travel and public transport routes;
• It avoids high quality agricultural land and does not raise issues of flood risk or land erosion;
• It maintains the quality of the historic environment;
• Proposed siting has minimised groundworks including excavation and fill;
• The house is designed to be adaptable for future needs and is all on one level; 
• The house is designed to have integrated photo voltaic panels to the south facing roof slopes; 
• The house is designed internally to have main habitable rooms in the elevations which benefit
from maximum daylighting and solar gain. 
2.11. As such, with regard to sustainable principles, it is accepted that the application is sustainably
located. Whilst some principles of sustainable design and construction methods are not clearly
set out, it is considered that further information can be obtained via condition (in this instance)
to demonstrate clearly how sustainable principles are being incorporated into the design. 
3. Natural Environment 
3.1. NPF4 Policy 3 (Biodiversity) generally seeks to protect biodiversity, reverse biodiversity loss and
to deliver positive benefits from development that strengthens nature networks. Policy 3(c)
requires that proposals for local development will include appropriate biodiversity measures

Page 23

proportionate to the scale and nature of the proposal. Policy 3(d) requires any potential adverse
impacts on biodiversity/nature networks/natural environment to be minimised by planning and
design. NPF 4 Policy 3 is generally aligned with LDP2 Policy 73 (Development Impact on
Habitats, Species and Biodiversity), although NPF4 Policy 3(c) goes beyond the LDP2
requirements in relation to current biodiversity interests of the site. 
3.2. NPF4 Policy 4 (Natural places) generally confirms that development that will have an
unacceptable impact on the natural environment will not be supported. Outside of European,
national and local designations, development is expected to meet the relevant statutory tests in
terms of protected species legislation; and potential impacts must be fully considered prior to
determination of planning applications. NPF4 Policy 4 (insofar as it relates to the location, nature
and scale of the current proposal) largely aligns with the provisions of LDP2 Policy 73. 
3.3. LDP2 Policy 04 seeks to conserve and enhance the natural and built environment and avoid
significant adverse impacts on biodiversity, natural and heritage assets. LDP2 Policy 73 ensures
that other legislation relating to biodiversity habitats are fully considered in relation to
development proposals; and generally, that development does not have an adverse impact on
habitat or species, particularly in relation to habitat or species designated as being of European,
national or local significance. 
3.4. The site is not located within or in proximity to any nature conservation designation. 
3.5. The Council’s Local Biodiversity Officer has been consulted on the proposals and requested
additional information (prior to determination) by way of; European protected species surveys
for bats & otter and a tree survey (including the bio-diversity value of individual trees). The
applicants have subsequently provided a Bat Scoping Survey Report, a full Tree Survey and a
Preliminary Ecological Assessment. With regards to the potential presents of bats and otter, the
submitted Bat Scoping Survey Report concludes that ‘having regard to the distribution of
species, habitat, potential roost features, suitability and importance of any of these and signs of
bat activity the risk of bat roosts or bats being disturbed is negligible or low and roosting can
reasonably be ruled out.’ Furthermore, the submitted Preliminary Ecological Assessment also
concludes with regards to bats ‘No further survey is required unless plans for tree felling are
changed at which point a pre-felling check should be undertaken’ based on the forgoing with
regards to bats it is recommended a pre-felling check for the presents of bats is undertaken prior
to the felling of any trees. With regards to the potential presence of otter the council bio-diversity
officers second consultation response notes that ‘A desk-study search shows there are no otters
within 5km of the site and no waterways are present on the site’. Furthermore, the submitted
Preliminary Ecological Assessment also concludes with regards to otter ‘No evidence of otters
was recorded, the Site is not suitable for otters either lying up or moving through territory, and
this species is not considered to be an issue.’ Based on the forgoing with regards to otter it is
considered that no further surveys are required.. With regards to trees this will be accessed
under section 5 below. 
3.6. The Council’s Local Biodiversity Officer also initially recommended that further protected
species surveys and proposed bio-diversity enhancement measures are conditioned as part of
any approval, however, they have updated their response in light of the submitted Preliminary
Ecological Assessment and provided a third consultation response. Within this they have
provided subsequent recommendations which are summarised as follows; that vegetation
clearance and tree felling are to be undertaken outwith the breeding bird season, pre-works
checks for bats, breeding birds (if it is not possible to clear outwith breeding bird season),
hedgehogs and amphibians are carried out prior to vegetation clearance and tree felling, a
programme for the eradication of INNS Rhododendron ponticum is submitted, that any felled
native species trees should be retained as deadwood, that the biodiversity enhancement
measures identified within the PEA report should be are followed and that a programme of tree
planting should be submitted to include species which must be native and appropriate to the
locality of the area including a schedule of monitoring and maintenance until such a time as the
trees become established. It is therefore recommended that appropriate planning conditions be
added to any approval covering the aforementioned.

Page 24

3.7. It is further recommended that any planning permission be subject to a condition requiring the
submission of a detailed scheme of landscaping including; hard and soft landscaping as well as
boundary treatments is submitted to and approved by the authority prior to works starting on
site. 
3.8. Based on the above and subject to appropriate planning conditions it is considered that the
proposals will have no adverse effect on a European Protected Species and meets the
requirements of LDP2 Policy 73. 
4. Built / Historic Environment 
4.1. The application site forms part of the original grounds of a Category B listed building, “Lagarie
House.” Additionally, within the vicinity is Category A listed “Ardencaple Hotel” which is adjacent
to Lagarie Lodge on the opposite side of Torwoodhill Road. 
4.2. The site is located within the Rhu Conservation Area. 
4.3. NPF4 Policy 7 (Historic assets and places) generally seeks to protect and enhance the historic
environment, assets and places, and to enable positive change as a catalyst for the regeneration
of places. 
4.4. NPF4 Policy 7(a) requires that development proposals with a potentially significant impact on
historic assets or places be accompanied by an assessment based on an understanding of the
cultural significance of the asset and/or place. Development will only be supported where the
character and appearance of the conservation area is preserved or enhanced. It is noted that
officers are satisfied that the proposals have met the policy requirements of NPF4 Policy 7(a)
and have submitted a further assessment in May 2025 which provides an assessment
demonstrating the acceptability of design as per the requirements of NPF 4 Policy 7. 
4.5. NPF4 Policy 7(c) requires that development proposals affecting the setting of a listed building
preserve its character, and its special architectural or historic interest. LDP2 Policy 16 (Listed
Buildings) add to this that that development must be of the highest quality, and respect the
original structure in terms of setting, scale, design, materials and proposed use. 
4.6. NPF4 Policy 7(d) requires that development proposals in a conservation area will only be
supported when the character or appearance of the conservation area is preserved or
enhanced. Relevant considerations include the architectural and historic character of the area;
existing density, built form and layout; context and siting, quality of design and suitable materials.
LDP2 Policy 17 (Conservation Areas) broadly reflects this. 
4.7. The Council’s Design and Conservation Officer was consulted on the initial proposals and
summarised; ‘…the principle of development on the site has been accepted through the
approval of 23/01502/PP, which remains extant. 25/00576/PP puts forward a revised design,
being small scale and single storey. The front façade remains in line with those of Lagarie House
and Lagarie Lodge. The elevations appear to be erroneously named as, from the plan, the
elevation marked “south-east” would face the road (to the south, south-west). The design of this
elevation with its square full height glazing, does not appear to fit particularly harmoniously with
either Lagarie House or Lagarie Lodge. It would perhaps be more appropriate to rotate the
design 90 degrees counter-clockwise to allow some of the more traditional elements of the
design to face the road.’ Subsequently discussions were had with the applicants to address the
concerns raised by the council Design and Conservation Officer and a revised house design
was submitted. The design amendments, alter the massing and proportions of the proposed
house to allow for a street facing elevation which appears to be more formal and gives the
appearance of a principal elevation as opposed to the previous design, the from is still of two
gable elements, however as opposed to have the two gable elements of differing ridge heights
in parallel to each other, they are now proposed to bi-sect and the two ridge heights are equal
which pulls up the ridge height to similar proportions as the neighbouring property Lagarie

Page 25

Lodge. The footprint has also increased slightly by 25sqm and has moved slightly closer to the
West as to omit any possible privacy issues with Lagarie Lodge. The materials pallet has also
been updated to take queues from the surrounding built environment. The councils Design and
Conservation Officer has been re-consulted on the design amendments and has noted ‘The
design currently being assessed under 25/00576/PP has been revised, with changes made to
the scale, materials and design. The proposal now includes beige-grey windows (RAL 7006) as
well as off-white wet dash render and red cedar cladding, introducing potentially too many
confusing elements with insufficient cognisance of the architectural character of the immediate
context. Additionally, the proposed roof design is unclear as, while the elevations show the
whole roof to be one height, this is not what is shown on the roof plan – this shows the side roofs
meeting the main roof at a point approx. 1/6 of the distance from ridge to eaves, which would
alter the elevations…. A Planning Statement has been submitted however this does not include
analysis of the site within the conservation area and setting of listed Lagarie House, and how
the design has developed within this regard….’. with regards to the Design and Conservation
Officer’s updated comments officers would note that the applicants have submitted an updated
roof plan which ties in with the submitted elevations, with regards to the proposed materials; the
off-white wet dash render is intended to match the existing style of surrounding properties, the
slate roof will also match neighbouring properties, the dark grey rainwater goods and fascias
are to tie in with the slate roof, the beige-grey windows and doors draw inspiration from
neighbouring Lagarie House’s feature sandstone which is a similar colour and the inset western
red cedar porch is to add an element of interest to the principal elevation which draws inspiration
from the painted woodwork on Lagarie House. It is recommended that a planning condition will
be added to any approval requiring the submission and approval of all external materials
samples prior to works commencing on site to ensure these are appropriate when viewed as a
whole. Lastly the councils Design and Conservation Officer notes concern that a further
assessment with regards to NPF4 Policy 7 has not been included within the Planning Supporting
Statement. Officers can confirm that the applicants submitted a separate further assessment as
noted within section (G) of this report above. 
4.8. Officers are satisfied that the proposed development, by reason of siting, scale, form and
architectural style is of a sufficiently high standard and will preserve the character and
appearance of this part of the Rhu Conservation Area and will not have an adverse impact on
character of surrounding listed properties in accordance with NPF 4 Policy 7, LDP2 Policy 16,
LDP2 Policy 17 and relevant HES guidance on development impact on historic assets. 
5. Impact on Trees 
5.1. The site was formerly part of Lagarie House’s lawn, however the land surrounding Lagarie
House has been subdivided and is now in separate ownership. There is an established natural
belt of trees and large shrubs along the South, East and West site boundaries separating it from
the grounds of Lagarie House, Lagarie Lodge and the A814. To the Southern boundary of the
site and also extending up the Western boundary there is a large rhododendron hedge. 
5.2. A tree survey has been undertaken of the site and its surrounds as summarised earlier in the
report. It is proposed to remove the large rhododendron hedge and 8no. Trees to enable this
development (as shown on the Existing Block Plan), these are mainly located to the area where
the new access and driveway area are proposed. It is noted that the site is covered by an Area
TPO which was established on the 23.08.1983. Trees planted after this date would not be
covered by this TPO, however, as the site is also within a conservation area all existing trees
(with a trunk diameter over 75mm measured at 1.5m in height above ground) are automatically
protected. The Tree Survey Report submitted as part of this application has categorises the
trees to be removed as; one category B tree (an Oak), 6 category C trees (a Wild Cherry, an
Oak, two Elm trees and two Holly trees) and one category U tree (a Rowan tree). Please note
that category B trees are considered to be; trees of moderate quality, category C trees are
considered to be; trees of low quality and category U trees are considered to be trees unsuitable
for retention. Trees will remain along the east and west boundaries to maintain the privacy of
neighbouring properties, as side from 3no. Trees which will be removed on the west boundary.

Page 26

Indicative replacement planting has been indicated on the proposed block plan to the Northern
boundary, however, a detailed planning condition is recommended which will require details of
the proposed compensatory tree planting to be submitted to and approved by the authority prior
to works commencing. Lastly it is proposed to fully remove the substantial rhododendron hedge
as this is a non-native invasive species this is considered acceptable and a planning condition
is recommended to ensure that this non-native invasive species is eradicated according to best
practice guidelines. 
5.3. NPF4 Policy 6 requires the retention of any individual trees of high biodiversity value or veteran
trees. In this instance, the survey found that no ancient or veteran trees are present on or around
the site. In other respects, with regards to the biodiversity value of trees within the site, it is noted
that the councils biodiversity officer initially requested that the biodiversity value of all trees within
the site was recorded, however, we have subsequently received a Preliminary Ecological
Assessment which concludes that the woodland within the site is considered to be of a moderate
bio-diversity value. It is also noted that all trees to be removed are located within or in close
proximity to the rhododendron hedge, the present of which is considered to negatively affect the
biodiversity value of these trees. Therefore it is not considered that the individual trees to be
removed are of high biodiversity value and that removal of the trees proposed will have an
adverse impact on the ecological condition of the area, based on the Preliminary Ecological
Assessment, Tree Survey Report and Officers inspection of the site, this is further supported by
the additional planting of additional native species trees, to be secured by condition. It is also
noted that the council’s biodiversity officer has recommended that any felled native species
should be retained as deadwood to further enhance the biodiversity of the site, it is confirmed
that a planning condition will be recommended requiring this. 
5.4. It is recommended that any planning permission be subject to a condition requiring the
submission of a tree protection plan and that all retained trees on site are protected during
construction in accordance with the British Standard; BS 5837:2012 (Trees in relation to design,
demolition and construction – Recommendations). 
5.5. On the above basis it is considered that the proposal is in accordance with the provisions of
NPF4 Policy 6 (Forestry, woodland and trees) and LDP2 Policy 77 (Forestry, Woodland and
Trees). 
6. Road Network, Parking and Associated Transport Matters. 
6.1. Access to the site is proposed directly from the A814. It is proposed to create the access to the
site through the existing stone wall which bounds the frontage of the site, the new access will
be located centrally on this frontage. The existing stone wall is considered to be listed by way
of curtilage listing relative to Lagarie House (category B listed) and there is an extant listed
building consent for the alterations to this wall (reference; 23/01503/LIB). 
6.2. From the access junction a private driveway will continue approximately 60m into the application
site to a parking and turning area laid out to the rear of the proposed house. Three car parking
spaces are identified on the application drawings as well as the location for the proposed waste
storage facilities. 
6.3. NPF4 Policy 13 (Sustainable transport) generally aims to encourage, promote and facilitate
developments that prioritise alternative means of transport to car journeys and reduce the need
to travel unsustainably. The requirement to submit a Transport Assessment is introduced for
some developments however this relates to larger scale developments than the current proposal
for a single house, this policy is largely aligned with LDP2 Policy 33 (Public Transport
Infrastructure). 
6.4. The elements of NPF 4 Policy 13 that are relative to the scale and nature of this development
are largely aligned with the provisions of LDP2 polices 36 (New Private Accesses) & 39
(Construction Standards for Private Access), which relate to new private accesses and
construction standards for private access.

Page 27

6.5. The consultation response from Council Area Roads notes that roads have no objection to the
proposed, subject to any approval being subject of planning conditions relating to; access
detailing (As per standard detail SD08/002 Rev.B), gradients, surfacing, visibility splays, parking
& turning, drainage and any gates. 
6.6. The submitted site layout drawing shows 3 no. car parking spaces and adequate turning space
and notes; New access, visibility splays and wall to be as per previous approval ref;
23/01502/PP. 
6.7. On the above basis and subject to the recommended roads conditions it is considered that the
proposal is in accordance with the provisions of NPF4 Policy 13 and LDP2 Policies 36 & 39. 
7. Infrastructure 
7.1. Water supply and foul drainage is proposed to be by means of a connection to the existing
Scottish Water network. The consultation response from Scottish Water does not indicate any
issues with this but advises that further investigations may be required to be carried out once a
formal application has been submitted to them. Scottish water has also noted that the applicants
are required to submit a wastewater application to allow Scottish Water to fully appraise the
proposals. On this basis, officers are satisfied in principle that there are no known constraints in
respect of public water and sewage infrastructure. 
7.2. The consultation response from Scottish Water specifically advises that a surface water
connection into its combined drainage system will not be accepted. Therefore, any approval will
be subject to a planning condition that the development incorporate a Sustainable Urban
Drainage System (SuDS). SuDS to be designed and installed in accordance with the principles
of the SuDS Manual (C753). 
7.3. In terms of potential flood risk, the application site, is not overlain by any recorded areas at risk
to coastal, fluvial or surface water flooding with reference to the SEPA Flood Map. 
7.4. It is further recommended that the provision of electric vehicle charge points, as per LDP2 Policy
34 (Electric Vehicle Charging), is subject of an informative given the new Building Standards
regulations introduced after the publication of the LDP. 
7.5. Subject to the above, it is considered that the proposal makes adequate provision for services
infrastructure in accordance with the provisions of NPF4 Policies 18 (Infrastructure first), 20
(Blue and green infrastructure) & 22 (Flood risk and water management) and LDP2 Polices 06
(Green and Blue Infrastructure), 33 (Public Transport Infrastructure), 34 (Electric Vehicle
Charging) & 61 (Sustainable Drainage Systems). 
8. Planning history 
8.1. The application site was formerly part of the garden ground of B listed Lagarie House. Lagarie
House is dated 1901 and was designed by the noteworthy architect A N Paterson and is a 2
storey plus attic asymmetrical Arts and Crafts house. The property was a private residence until
operating as a children’s home from 1949 until 1982. From researching historical maps it
appears that Lagarie Lodge was built in the 1950’s. Lagarie House was initially listed in 1980 as
a category C listed property however, since then the category of listing has been uplifted to
category B. In 1983 planning consent was given for the change of use and sub-division of the
property to form 4 flats. At this time planning permission was also given for the erection of 5
additional dwelling houses within the garden ground to the North-West & West of Lagarie House
(application references; C6986 & C6994). 
8.2. In 1989 there was an outline planning application for the erection of a detached 2 storey
dwellinghouse with integral double garage on this application site (application reference;
C8400). This application was refused and the decision was subsequently appealed. This appeal
was dismissed in 1990 (appeal reference; P/PPA/SH/137).

Page 28

8.3. There was a planning application for the site (reference; 11/00528/PP) submitted in 2011 by a
different applicant for the erection of 5 flats and car ports, this application was withdrawn prior
to determination. 
8.4. There was a planning application for 2 houses with detached garages and a proposed access
from Torwoodhill Road in 2019 (reference; 19/02162/PP). This application was withdrawn prior
to determination due to concerns raised by the roads department in terms of the proposed
access and also concerns raised by officers in regards to the proposal for 2 houses being
overdevelopment of the site / not appropriate in terms of the settlement pattern in the area. 
8.5. In 2020 there was a further planning application (reference; 20/01382/PP) for a single dwelling
with proposed access from the A814. At this time an accompanying listed building consent
application was also submitted in relation to the formation of the vehicular access through the
listed wall (reference; 20/01383/LIB). At this time officers had concerns in regards to the design
and scale of the proposal in terms of its relationship to the site and surrounding residential area.
This application along with the listed building consent application was withdrawn prior to
determination. 
8.6. In 2023 a planning application (reference; 23/01502/PP) for a single dwelling with proposed
access from the A814 was submitted along with an accompanying listed building consent
application in relation to the formation of the vehicular access through the listed wall (reference;
20/01383/LIB). These applications were both approved on the 23rd of May 2024 and remain
extant consents.   
8.7. It is noted that the planning history of the site is a material planning consideration, which has
been taken into consideration and afforded weight in determining this application. In the case of
the previous refusal, appeal and subsequent dismissal for outline planning permission for a
single dwelling on the site, which has been noted by objectors. Officers have considered this
and for the avoidance of doubt it is confirmed that the existence of a previous appeal decision,
refusing planning permission, does not preclude a future planning application being submitted,
nor does it prevent the Council as planning authority from determining the application. In the
instance of this application a substantial period of time has elapsed since the appeal decision;
within this time the relevant development plan and other relevant policy considerations have
been superseded by subsequent iterations of the Local Development Plan and National Policy
and Guidance and accordingly it is necessary for any decision on the current application to be
assessed against these revised provisions and in relation to the current circumstances of the
site and its surrounds. It is also confirmed that the approval for a single dwelling (reference;
23/01502/PP) in May 2024 on this application site accepts the principle of development for a
single dwelling on this site. 
8.8. On the basis of the above it is confirmed that having regard to all material considerations it is
considered that the proposal is acceptable.