Page 1

Argyll & Bute Council
Development & Economic Growth   
This report is a recommended response to the Scottish Government’s Energy
Consents Unit (ECU) consultation on the Section 36 application for a wind farm
located on the Killean Estate, near Tayinloan consisting of 9 turbines each with a
maximum blade tip height of up to 180m. Generating capacity will be more than 50MW 
Reference No: 24/01541/S36/ECU00004927
Applicant: The Scottish Government
Proposal: Section 36 Consultation for wind farm located on the Killean Estate,
near Tayinloan, consisting of 9 turbines each with a maximum blade
tip height of up to 180m. Generating capacity will be more than 50MW.
Site Address: Killean Estate, near Tayinloan 
(A)  THE APPLICATION 
The Section 36 Application comprises the following key elements: 
• Up to 9 wind turbines, each with a maximum tip height of 180m
• At each wind turbine, associated low to medium voltage transformers and related
switchgear
• Permanent wind turbine foundations
• Hardstanding areas for crane erection at each wind turbine
• Two new watercourse crossings and 14 existing crossings which may need to
be upgraded
• Approx. 10.5km of access tracks, comprising 5.58km of new tracks and 4.92km
of existing tracks to be upgraded
• Upgraded site access from the existing junction with the A83
• Temporary turning area to facilitate access on opposite side of road to site
access
• Onsite underground electrical cables and cable trenches
• Substation compound
• A temporary construction compound for office welfare and materials storage
• Up to 6 borrow pit search areas
• The potential for onsite concrete batching, the location of which would be
confirmed prior to commencement of development once need is confirmed
• Felling of 41.3ha hectares of forestry and associated compensatory planting.
• Habitat management and biodiversity improvements as set out in Outline
Biodiversity Enhancement Management Plan (OBEMP) 
The expected operational life is 50 years from the date of commissioning. 
Connection to Electricity Grid - The proposal is likely to be connected to the grid
network at Carradale substation, approx. 11.2km southeast of the site. Works
required to connect to the national grid would be the subject of a separate consenting
process.

Page 2

(B) RECOMMENDATION: 
That the ECU be notified accordingly that: 
(1) There is an unresolved objection from National Air Traffic Services Safeguarding
(NATS). Consequently, Argyll & Bute Council OBJECT on the grounds that the
proposal will have an adverse Aviation Impact, contrary to the provisions of
Policy 11 – Energy of NPF4 which requires that project design and mitigation
demonstrates how impacts on aviation and defence interests including seismological
recording have been addressed, Policy 30 – the Sustainable Growth of Renewables
of LDP2 which requires impacts on aviation and defence interests and seismological
recording to be addressed, and Policy 43 – Safeguarding of Aerodromes of LDP2
which stipulates that development will not be permitted where it would compromise
the safe operation of an Aerodrome or Technical Site or constrain their present or
future operations. 
Note: If NATS withdraw their objection and subject to any conditions they
recommend being attached to any grant of consent Argyll & Bute Council
would no longer object on these grounds. Should the objection remain
unresolved, and the proposal progresses to Public Inquiry, Argyll & Bute
Council would defer to NATS. 
(2) Argyll & Bute Council has no objection in respect to landscape and visual
impact subject to conditions to secure the mitigation recommended by the Council’s
Consultant Landscape Architect being attached to any grant of consent: 
• Aircraft Detection Lighting System 
• Substantial increases in broadleaved planting as part of the wind farm restocking
plan including riparian planting across the wider Killean estate. 
• Redesign of the outer margins of productive woodland to remedy hard angular edges
and improve the fit of plantations with landform. 
• Compensatory planting should be undertaken within the Killean Estate. Argyll & Bute
Council and Scottish Forestry should be consulted on the location, extent, and
composition. 
• Management of existing mature mixed woodlands in the vicinity of Killean House
including new planting to retain and enhance screening of the proposed wind farm
from the coast and protect the landscape setting provided to the Killean Estate
buildings and St John’s Church. 
(3) Argyll & Bute Council has no objection in respect to archaeological impact,
subject to conditions to secure appropriate archaeological mitigation being attached to
any grant of consent following further consultation with the West of Scotland
Archaeology Service. 
(4) Argyll & Bute Council has no objection in respect to Biodiversity Impact, subject
to conditions to secure the recommendations of the Local Biodiversity Officer being
attached to any grant of consent. 
• An appropriate plan for mitigation against potential deer impact on newly planted
trees until such time as they are established and no longer vulnerable to over-
browsing.

Page 3

• While the impact to bats is unlikely to be significant, it would be advisable to monitor
any fatalities that may occur from collision as they are found to forage within the wind
turbine areas. 
(5) Argyll & Bute Council has no objection in respect to noise impact, subject to
suitably worded conditions to limit the noise levels, tonality, and amplitude modulation to
control noise levels from the proposal and provide appropriate noise mitigation as
recommended and agreed by the Councils Noise Consultant. 
(6) Argyll & Bute has no objection in respect to flood risk subject to conditions to
secure the recommendations of the Flood Risk Assessor being attached to any grant
of consent: 
• To ensure watercourse crossings are designed so there is no reduction in pre-
development channel cross sectional area ideally to pass the 1 in 200 year plus
climate change flood event; and,
• Surface water drainage is designed in accordance with CIRIA C753 and ensures
that post development runoff is attenuated to the 1 in 2 year greenfield runoff
rate. The surface water drainage should be in operation prior to the start of
construction. 
(7) Argyll & Bute Council has no objection in respect to Access subject to the
condition to secure the recommendation of the Access Officer being attached to any
grant of consent: 
• Access Plan to be submitted and agreed in writing by the Council prior to the
commencement of development. 
(8) Argyll & Bute Council has no objection in respect to provision of the turning area
across from the site access subject to the following conditions being attached to any
grant of consent. 
• Exact details and specifications of the design of the turning area to be submitted for
the written approval of the Planning Authority prior to commencement of
development.
• Exact details and specification of the restoration plan for the turning area to be
submitted for the written approval of the Planning Authority prior to commencement
of development. These shall include details of timescales and landscaping.
• A condition to limit the turning area to an appropriate temporary period to be agreed
in writing by the Planning Authority. 
(9) Argyll & Bute Council requests that all conditions recommended by other
consultees are included in any Consent. 
(C) CONSULTATIONS 
ENERGY CONSENTS UNIT RESPONSES 
NatureScot (18th November 2024) – advised the ECU they objected until further
collision risk information regarding the Kintyre Goose Roosts Special
Protection Area was provided. That while there are significant adverse landscape
and visual effects, they do not raise issues of national interest. They noted the
presence of Leisler’s bats within the footprint of the proposal, and that further advice

Page 4

would be provided separately. They defer to Argyll & Bute Council and North
Ayrshire Council in terms of effects on locally designated landscapes. 
NatureScot (23rd January 2025) (Leisler bat advice) – advised the ECU that the bat
surveys indicate that there is at least a moderate level of bat activity within the survey
area. Of note is the occurrence of Leisler’s bat, which is a rare and high-risk species.
Kintyre is not currently acknowledged to be within the Leisler’s bat range; however,
the bat survey provides evidence of a wider distribution of this species in Scotland
than is currently known. Bat Mitigation - as the Applicant is proposing to keyhole
turbines into existing forestry, this can increase the risk of bat fatalities due to the
increase in forest edge habitat close to the turbines and associated infrastructure.
NatureScot advise that feathering is routinely applied to the turbine blades below
cut-in speed during operation. This measure can help reduce the risk of bat
casualties by 50%. If feathering is implemented, NatureScot would ask that
monitoring is carried out for 3 years post-construction to assess changes in bat
activity. NatureScot note that the Applicant was unable to have bat data analysed
through Ecobat as it was unavailable. NatureScot believe it is now available and
advise that the Applicant has the data analysed, if possible, to provide an
independent assessment on the level of bat activity at the site. 
NatureScot (30th May 2025) (response to additional information provided regarding
the Kintyre Goose Roosts Special Protection Area) – advised the ECU there are
natural heritage interests of international importance, but they will not be adversely
affected. This response should be read in conjunction with their other advice
provided on landscape & visual, ecological and bat impacts. 
Applicant Response to NatureScot’s further comments (18th June 2025) –
Applicant provided a note on NatureScot’s 30th May response to the ECU on issues
relating to ornithology, including Greenland White-fronted Geese, Survey Quality,
Golden Eagle, Black Grouse and Red-throated Diver. 
RSPB Scotland (29th November 2024) – advised the ECU they shared NatureScot's
concern regarding collision risk for Greenland White-fronted Geese and would
comment further on this once the information was provided. They advised that the
Outline Biodiversity Enhancement and Management Plan (oBEMP) is appropriate
and welcome the proposals that have been included. They note that felling will be
required should the proposal be consented. It is unclear where the Compensatory
Planting (CP) is to be provided. They recommend that it is delivered as low-density
native shrub and broadleaf woodland, and that planting on good quality open ground
habitats is avoided. 
RSPB (17th June 2025) (response to additional information provided regarding the
Kintyre Goose Roosts Special Protection Area) – advised the ECU they have no
further comments to make on the revised collision risk model for Greenland White-
fronted Goose. They do not object. 
Historic Environment Scotland (HES) (20th November 2024) – advised the ECU
the proposal does not raise historic environment issues of national significance, and
they do not object. They recommend that any trees forming the woodland backdrop
to the Killean Estate damaged or removed by works to upgrade the wind farm access
tracks, should be replaced. The access tracks should be designed to avoid direct
impacts on the Category A listed Doll’s Houses and avoid impacts on their setting,
and removal of the temporary bellmouth upon completion of turbine delivery.

Page 5

Scottish Forestry (25th September 2024) – advised the ECU compensatory planting
should be secured by a condition. Furthermore, the appropriate consenting route
required to accommodate construction, including infrastructure and management
felling, totalling 41.3ha would be the Section 36 consent. Restocking of management
felling areas and compensatory planting relating to permanent woodland loss would
also be via the Section 36 consent. 
Transport Scotland (TS) (4th October 2024) – advised the ECU they have no
objection subject to conditions being attached to any consent to secure approval of
details of the means of access to the trunk road, the route for abnormal loads,
abnormal load accommodation measures required, any necessary additional signing
or temporary traffic control measures, a Construction Traffic Management Plan
(CTMP), and wheel washing facilities. In addition, advisory notes are provided
relating to works within the trunk road boundary. 
SEPA (Scottish Environment Protection Agency) (2nd October 2024) – have
advised the ECU they have no objection subject to conditions being attached to any
consent to secure finalised plans for borrow pit management and restoration prior to
commencement of development (if not attached SEPA object), and a Finalised Peat
Management Plan. 
Argyll District Salmon Fishery Board (ADSFB) (25th September 2024) – advised
the ECU they are satisfied the proposal should not have any significant impact on
migratory salmonid fish habitat providing the construction phase is conducted
according to current environmental regulations. ADSFB are mindful that migratory
salmonid fish (sea trout) are present in the lower reaches of the Killean Burn,
Tayinloan Burn, Clachaig Water and Carradale Water which may be affected by any
deterioration in water quality caused during construction. ADSFB advise that in the
event of consent being granted monitoring of Water quality, macroinvertebrates, and
fish is undertaken to Scottish Government guidelines. 
Scottish Water (26th August 2024) – advised the ECU they have no objection. They
provide advice on Drinking Water Protected Areas and Surface Water. 
Ironside Farrar, Peat Landslide Hazard Risk Assessment (PLHRA), Stage 1
Checking Report (PLHRA) (6th February 2025) – advised the ECU the PLHRA is
satisfactory. 
Defence Infrastructure Organisation (DIO) (30th August 2024) – advised the ECU
that, subject to conditions to secure Aviation Lighting and Aviation Charting and
Safety Management they have no objection. 
NATS Safeguarding (23rd August 2024) – advised the ECU the proposal conflicts
with their safeguarding criteria and they object. 
NATS Safeguarding (14th July 2025) – advised the ECU that it is always their
preference to identify mitigation and, put in place the delivery framework before
withdrawal of their objection. However, they can confirm that they do have an
identified mitigation that with the commitment of both parties can be delivered prior
to the development commencing. 
Glasgow Airport (9th September 2024) – advised the ECU they have no objection. 
Glasgow Prestwick Airport (GPA) (4th October 2024) – advised the ECU they have
no objection.

Page 6

Highlands & Islands Airport (22nd October 2024) – advised the ECU they required
an updated Instrument Flight Procedure Assessment report and submitted a holding
objection. 
Highlands and Islands Airports Limited (HIAL) (27th January 2025) advised the
ECU that an updated Instrument Flight Procedure impact assessment has been
provided which confirms the proposal will have no impact on the IFPs serving
Campbeltown Airport. Therefore, HIAL remove their holding objection. 
Campbeltown Community Council (3rd October 2024) – advised the ECU they
object on the following grounds: proximity to A83 and visibility, industrialisation of
Kintyre landscape, adverse impact on tourism, adverse visual impact, flooding on
the A83, adverse impact on peat deposits, use of outside contractors instead of local
firms, road delays caused by delivery of abnormal loads, and movement at night will
cause disruption due to noise and vibrations. 
West Kintyre Community Council (4th October 2024) – have advised the ECU they
object on the grounds of landscape & visual impact (including cumulative), adverse
impact on tourism, increase in local flooding, adverse noise and visual impact for
nearby properties, possible ill health effects, lack of information on battery storage
plans, and adverse ornithological impact. 
East Kintyre Community Council (22nd August 2024) – have advised the ECU they
object on the grounds of lack of full economic assessment on tourism attractions
(based on Kintyre), and adverse visual impact. 
Tarbert & Skipness Community Council (TSCC) (3rd October 2024) – have
advised the ECU they object on the grounds of the previous refusal on this site (WIN-
130-3), adverse visual impact, length of consent sought (50 years), approval would
set bad precedent, adverse impact on recreation & tourism, Adverse impact on
natural heritage and ornithology, cultural heritage impacts and adverse impact of
aviation Lighting. 
BT (29th August 2024) – advised the ECU they have no objection. 
Arqiva (28th August 2024) – advised the ECU they have no objection subject to a
condition to mitigate the impact of any degradation of television and radio reception
caused by the wind turbines. 
Joint Radio Company (29th August 2024) – advised the ECU the proposal is
cleared subject to a condition to secure 100m Micrositing with respect to radio link
infrastructure operated by the local energy networks. 
North Ayrshire Council (4th October 2024) – advised the ECU that consideration
should be given to the potential impacts on the North Arran NSA. 
Argyll & Bute Council Consultee Responses 
Consultant Landscape Architect (10th February 2025) - recommends no objection
in respect of landscape and visual interests subject to conditions to secure: an Aircraft
Detection Lighting System, Substantial increases in broadleaved planting as part of the
wind farm restocking plan including riparian planting across the wider Killean estate,
Redesign of the outer margins of productive woodland to remedy hard angular edges
and improve the fit of plantations with landform, Compensatory planting within the Killean

Page 7

Estate. Argyll & Bute Council should be consulted, in addition to Scottish Forestry, on
the location, extent and composition of this planting, and management of existing mature
mixed woodlands in the vicinity of Killean House including new planting to retain and
enhance screening of the proposed wind farm from the coast and protect the landscape
setting provided to the Killean Estate buildings and St John’s Church. 
West of Scotland Archaeology Service (WOSAS) (28th August 2025) – does not
recommend an objection and provides general comments and advice on direct and
indirect physical impact issues and setting and cumulative impact issues. In terms
of cumulative impact WOSAS find they cannot support the proposed encroachment
onto lower ground that is more densely populated with known archaeological sites
and monuments. WOSAS does not believe that an objection solely based on
predicted adverse impacts on the historic environment would be likely to be
sustained. However, they believe that the broader impacts they have referred to
might be employed to add weight to the Landscape & Visual Impact Assessment of
the proposal. Should the Council determine to object on these or on other grounds
they would be pleased to advise further as required. Similarly, if a potential
archaeological condition or conditions are required for submission to the ECU or at
a later stage, they will be pleased to suggest a suitable form of words. 
Applicant Response to WOSAS (16th September 2025) – They are pleased there
is no objection recommended on cultural heritage grounds, and that there is no
specific issue with the predicted cultural heritage impacts. There is a comment that
there may be too much focus of the assessment on individual heritage assets. This
may be how the assessment is set out, however any relevant relationships to other
monuments / relevant historic landscapes, as far as it is possible to identify these,
would have been addressed as part of that. The comments are referring to a broader,
and more subjective appreciation of the historic environment. As this remains quite
vague, they are not sure there is much they can offer by way of a detailed response;
other than to emphasise that they have considered wider landscape relationships as
part of the setting impact assessment. If there is a specific monument or group of
monuments that they have not suitably assessed, they would be happy to respond
accordingly – noting there is a large range of heritage assets/archaeological sites
which span a large period. 
West of Scotland Archaeology Service – a copy of the Applicant’s response was
sent to WOSAS. At time of writing no further response has been received. 
Local Biodiversity Officer (23rd September 2024) – provides advice on the Kintyre
Goose Roosts SPA and its associated SSSI, Habitats Regulations assessment,
Biodiversity Enhancement Management Plan (BEMP), Habitat Losses and Impact,
peatland, European Protected Species, Species Protection Plan, Protected Species,
ecological clerk of works, ornithology. The Local Biodiveristy Officer recommends
that the applicant should include an appropriate plan for mitigation against potential
deer impact on newly planted trees until such a time that they are established and
no longer vulnerable to over-browsing and while the impact to bats is unlikely to be
significant, it would be advisable to monitor any fatalities that may occur from
collision as they are found to forage within the wind turbine areas. 
Noise Consultant (3rd March 2025) – advise that good practice has been adopted
by the applicant, with a few minor issues identified. The most significant of these
issues are: 
• The study area for Killean wind farm includes receptors that are exposed to noise
levels from the operational Deucheran wind farm and consented Clachaig Glen

Page 8

wind farm. It has been shown that the application of apportioned noise limits will
be necessary to ensure cumulative noise impacts do not exceed the derived
noise limits at some receptors. It is recommended that the Applicant considers
this and suggests suitable values. 
• The omission of the details of any screening attenuation and concave ground
corrections that have been applied. The inclusion of the applied values in the
reporting is suggested within good practice but is not a formal requirement,
however, it has potentially led to an inability to accurate replicate the applicant’s
calculations. 
• The receptor labelled H27 ‘South Beachmore Farm’ is incorrectly named ‘High
Crubasdale’ in Tables 11.7, 11.8, 11.9 and 11.10. 
• Confirmation there are no derelict properties with residential planning status in
the study area. 
• The proposed noise condition does not contain the partial levels. Nor include a
suitable control for amplitude modulation. 
Following a satisfactory response there would be no reason to object on noise
grounds.  A suitably worded condition to limit the noise levels, tonality and amplitude
modulation should be applied to control noise levels from the proposal.  A revision
based on the proposed condition should be provided. 
Applicant response to Noise Consultant (1st October 2025) – have considered
the Council’s Noise Consultants review and note that some minor points have been
raised. They will be pleased to agree a wording for a revised noise condition which
will include updated limits that more thoroughly account for potential cumulative
operational impacts and that include controls for amplitude modulation (AM). This
will provide further comfort that the requirements of ETSU-R-97 will be met in
practice. They consider that this can be addressed during the agreement of
conditions process. Additionally, they acknowledge the error highlighted relating to
receptor location coordinates and will be happy to correct this. Finally, they confirm
that from their understanding, the previous consent for the reinstatement of a
residential dwelling at Braids has lapsed and there are no derelict properties with
residential planning status in the study area. 
Noise Consultant (1st October 2025) – have reviewed the clarifications provided
by the applicant and would respond as follows: 
• They agree that the apportioned limits can be agreed with the conditions (if
consent is granted)
• They note that no further information on screening or valley correction has been
provided – it will be the applicant’s responsibility to ensure the agreed noise limits
can be met. They are unable to verify this in the absence of this information.
• Confirmation of typos is fine.
• Confirmation that there are no derelict properties is fine.
• Confirmation that the applicant will accept an AM condition is also fine. 
On that basis, they conclude that satisfactory clarifications have been provided or
can be dealt with at the conditions stage of the application, and their previous
conclusions regarding the acceptability of the scheme still stand.

Page 9

ABC Roads and Amenity Services (5th September 2024) – no objection. The site
access connects directly to the A83 Tarbet - Campbeltown Trunk Road, Transport
Scotland should be notified. 
Flood Risk Assessor (7th November 2024) – no objection subject to conditions to
ensure watercourse crossings are designed so there is no reduction in pre-
development channel cross sectional area ideally to pass the 1 in 200 year plus
climate change flood event; and, surface water drainage is designed in accordance
with CIRIA C753 and ensures that post development runoff is attenuated to the 1 in
2 year greenfield runoff rate. The surface water drainage should be in operation prior
to the start of construction. 
Access Officer (8th July 2025) – no objection subject to a condition requiring the
developer to prepare an Access Plan for approval by the Council prior to the
commencement of construction. 
Please note: the above are summaries and the full consultee responses can
be viewed on the Energy Consent Unit and Argyll & Bute Council websites. 
(D) HISTORY:   
16/03400/S36 – S36 consultation for proposed Killean Wind Farm, Killean Wind
Farm, Tayinloan – Objection submitted to ECU 18th October 2017. 
16/01313/PP - Erection of 14 wind turbines (13 with a blade tip height of up to 126.5m
(and hub height of up to 80m) and one with a blade tip height of up to 115.5m (and
hub height of up to 69m)), upgrading of permanent access, formation of site access
tracks, erection of permanent anemometer mast, control building and substation,
watercourse crossings and temporary construction compound, Clachaig Glen wind
farm, Land North East of Muasdale – Refused 21st September 2017. 
Both the above wind farms were considered at a conjoined Public Inquiry which
commenced on the 9th of January 2019 the outcome of which is detailed below: 
WIN-130-3 Killean – Scottish Ministers refused the application on the 18th of
December 2019 
PPA-130-2064 (Planning Permission Appeal) Clachaig Glen – Scottish Ministers
allowed the appeal and granted planning permission on the 18th of December 2019. 
22/00613/S36 – S36 Consultation regarding the proposed Clachaig Glen wind farm
and battery storage located approximately 20km north of Campbeltown and 1.8km
north-east of Muasdale on the west coast of the Kintyre – Objection submitted to the
ECU on the 19th of January 2023. 
WIN-130-7 Clachaig Glen – Following objection from the Planning Authority, a Public
Inquiry was held on various dates between August and December 2023, the
outcome of which was that Scottish Ministers granted Section 36 consent on the 8th
of November 2024. 
(E)       PUBLICITY:   
As the Council is not the Determining Authority the ECU oversees the Publicity of
the application.

Page 10

Public Consultation – Whilst not a statutory requirement for Section 36
applications, the applicant has undertaken Public Consultation. Further information
on this is contained in the Killean wind farm Pre-Application Consultation (PAC)
Report, July 2024 available on the ECU website (reference: ECU00004927). 
(F) REPRESENTATIONS:   
As the Council is not the determining Authority any letters of representation are
considered by the ECU. At time of writing, the ECU are in receipt of 21 objections
and one general comment. The objections are from residents within the local area.
The main concerns raised relate to: 
• Public Inquiry – objectors would like to be kept informed and included.
• Historic Environment, Archaeology, and Listed Buildings (including the Dolls
Houses)
• Biodiversity - birds (including eagles), badgers, bats, otters, red squirrels, pine
martens, and Greenland White fronted geese. 
• Scale of development
• landscape and visual impact 
• Impact of aviation lighting on dark skies
• Misleading photomontages of VP’s
• Noise and Acoustic Environment, health, amplitude modulation, infrasound 
• Private water supplies
• Transportation – impact on roads, businesses, and homes 
• Amenity impacts on the property ‘Braids’ from turbines T14 and T17 
• Impact on the local economy and tourism 
• Walking routes and the Kintyre Way
• Previous refusal on this site for smaller wind farm
• Duration of consent – increase from 25 – 50 years
• Aviation/Navigation Safety
• Compensation/money/community benefit
• Maintenance and disposal of used turbines 
• Scotland does not need to produce any more energy
• Health & wellbeing 
• Impact on house at Kilmory 1968m
• Impact on peat
• Flooding
• Cumulative Impact - High level of applications in Kintyre
• Planning Policy LDP & NPF4 
Note: The comments raised above are addressed in the assessment of the
proposal at Appendix A of this report. 
Note: Please note that the representations above have been summarised, and
the full letters of representation are available on the ECU website. 
(G) SUPPORTING INFORMATION 
Has the application been the subject of:

Page 11

(i) Environmental Impact Assessment Report (EIAR): Yes 
EIAR presented in 4 volumes:   
• Volume 1: Written Statement
• Volume 2a: Figures (excluding LVIA)
• Volume 2b: LVIA Figures and Visualisations
• Volume 3: Technical Appendices
• Volume 4: Non-Technical Summary 
Key topics covered in the EIAR include: 
• Introduction 
• Chapter 2. Proposed Development Description 
• Chapter 3. Design Evolution and Alternatives 
• Chapter 4. Approach to EIA/Climate Change, Legislative and Policy
Context Chapter 5. Landscape and Visual Impact Assessment 
• Chapter 6. Cultural Heritage Assessment 
• Chapter 7. Ecology 
• Chapter 8. Ornithology 
• Chapter 9. Geology, Hydrology and Hydrogeological Assessment 
• Chapter 10. Traffic and Transport 
• Chapter 11. Noise 
• Chapter 12. Aviation, Radar, and Defence 
• Chapter 13. Other Issues (Socioeconomics, Telecommunications,
Infrastructure, Shadow Flicker, Carbon Balance). 
• Chapter 14. Schedule of Mitigation 
• Chapter 15. Summary of Residual and Cumulative Effects 
In addition, the following documents are also provided in support of the
application: 
• Planning Statement 
• Design Statement 
• Pre-Application Consultation Report 
(ii)  An Appropriate Assessment under the Conservation (Natural Habitats)
Regulations 1994:   NatureScot will advise the ECU  
(iii)  A Design or Design/Access statement:   Yes  
(iv)  Sustainability Checklists (with reference to the requirements of LDP2
Policy 04): Not required proposal accompanied by full EIAR.  
(v)  A report on the impact of the proposal e.g. Retail impact, transport
impact, noise impact, flood risk, drainage impact etc:  All relevant
reports are encompassed within the EIAR 
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:  No

Page 12

(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  No  
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been considered in the
assessment of the application 
(i) List of all Development Plan Policy considerations considered in assessment
of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 5 – Soils
NPF4 Policy 6 – Forestry, Woodland, and Trees
NPF4 Policy 7 – Historic Assets and Places
NPF4 Policy 11 – Energy
NPF4 Policy 22 – Flood Risk and Water Management
NPF4 Policy 33 – Minerals 
Annex B – National Statements of Need 
3. Strategic Renewable Electricity Generation and Transmission Infrastructure 
Argyll & Bute Local Development Plan 2 (LDP2) (Adopted 2024) 
Policy 02 – Outwith Settlement Areas
Policy 04 – Sustainable Development
Policy 15 – Protection, Conservation and Enhancement of Our Historic Environment
Policy 16 – Listed Buildings 
Policy 19 – Scheduled Monuments
Policy 20 – Gardens and Designed Landscapes
Policy 21 – Sites of Archaeological Importance
Policy 30 – The Sustainable Growth of Renewables
Policy 31 – Minerals 
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
Policy 43 – Safeguarding of Aerodromes
Policy 55 – Flooding
Policy 56 – Land Erosion
Policy 57 – Risk Appraisals
Policy 58 – Private Water Supplies and Water Conservation
Policy 59 – Water Quality and the Environment
Policy 60 – Private Sewage Treatment Plants and Wastewater Drainage Systems
Policy 61 – Sustainable Drainage Systems (SuDS)
Policy 62 – Drainage Impact Assessments
Policy 63 – Waste Related Development and Waste Management
Policy 70 – Development Impact on National Scenic Areas (NSA’s)
Policy 71 – Development Impact on Local Landscape Areas (LLA’s)
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 74 – Development Impact on Sites of International Importance

Page 13

Policy 75 - Development Impact on Sites of Special Scientific Interest (SSSIs)
Policy 76 - Development Impact on Local Nature Conservation Sites (LNCS)
Policy 77 – Forestry, Woodland, and Trees
Policy 78 – Woodland Removal
Policy 79 – Protection of Soil and Peat Resources
Policy 80 - Geodiversity 
(ii) List of all other relevant planning considerations considered in the
assessment of the application, having due regard to Annex A of Circular
3/2013 
• Scottish Energy Strategy (2017)
• Onshore Wind Policy Statement (2022)
• Draft Energy Strategy and Just Transition Plan (2023)
• Good Practice Principles for Shared Ownership of Renewable Energy
Developments, Scottish Government, 2019
• Onshore Wind Turbines: Planning Advice, Scottish Government (May 2014)
• The Argyll & Bute Landscape Wind Energy Capacity Study, 2017 (LWECS)
• ABC Technical Note – Biodiversity (Feb 2017)
• Landscape Institute and Institute of Environmental Management and
Assessment – Guidelines for Landscape and Visual Impact Assessment, Third
Edition (2013)
• Scottish Natural Heritage – Visual Representation of Wind Farms Guidance
(Version 2.2, 2017)
• Scottish Natural Heritage - Siting and Designing Wind Farms in the Landscape
Guidance (Version 3a, 2017)
• Historic Environment Policy for Scotland (2019)
• Scottish Government, Draft Planning Guidance: Biodiversity, 2023
• The Climate Change (Emissions Reduction Targets) (Scotland) Act 2024 
• Managing Change in the Historic Environment 
• PAN 1/2011: ‘Planning and Noise’ (March 2011)
• Scottish Government’s Policy on ‘Control of Woodland Removal’ (Forestry
Commission Scotland 2009) 
• UK Forestry Standard (UKFS)
• PAN 60 – Planning for Natural Heritage (Jan 2008)
• Views of statutory and other consultees
• Planning history of the site
• Legitimate public concern or support expressed on relevant planning matters 
(G) Is the proposal a Schedule 2 Development not requiring an EIAR: No, an EIAR
was required. 
(H) Has the application been the subject of statutory pre-application consultation
(PAC):  No - PAC is not required for S36 applications. 
(I) Does the Council have an interest in the site: No 
(J) Requirement for a pre-determination hearing: No
(K) Is the proposal consistent with the Development Plan: No – due to unresolved
objection from National Air Traffic Services

Page 14

(L) Need for notification to Scottish Ministers or Historic Environment Scotland:
No 
Author of Report: Arlene Knox                       Date: 3rd October 2025 
Reviewing Officer: Sandra Davies                 Date: 6th October 2025 
Fergus Murray
Head of Development & Economic Growth

Page 15

APPENDIX A – RELATIVE TO APPLICATION NUMBER: 24/01541/S36   
COMMITTEE REPORT   
PLANNING LAND USE AND POLICY ASSESSMENT   
1. THE SECTION 36 CONSENTING REGIME  
1.1 Any application for an onshore power generating station with an installed capacity
of over 50 megawatts (MW) requires the consent of Scottish Ministers under
Section 36 of the Electricity Act 1989. Any authorisation given includes a deemed
planning permission. Consequently, there is no need for a planning application to
be made to the Council. The Council’s role in this process is one of a consultee.  
1.2 The Development Plan is not the starting point for considering S36 applications.
The reason for this is that sections of the Planning Act which establish the primacy
of Development Plan Policy in decision making are not engaged. NPF4 and LDP2
form the Development Plan. Whilst they do not have primacy in S36 decision
making, they remain an important consideration to inform the Council’s
consultation response.  
1.3 Schedule 9 of the Electricity Act requires the applicant and the decision maker to
have regard to the preservation of amenity. It requires that in the formulation of
proposals the developer shall have regard to: 
(a) the desirability of preserving natural beauty, of conserving flora, fauna and
geological or physiological features of special interest and of protecting sites,
buildings, and objects of architectural, historical, or archaeological interest; and 
(b) shall do what he reasonably can to mitigate any effect which the proposals
would have on the natural beauty of the countryside or on any such flora, fauna,
features, sites, buildings, or objects.  
1.4 It obliges the Scottish Ministers as decision maker to have regard to the
desirability of the matters at (a) and the extent to which the applicant has complied
with the duty at (b).  
1.5 Assessment of the proposal against the policies of NPF4 and LDP2 will ensure
that proper consideration is given by the Council to the extent that the proposal
satisfies these Schedule 9 duties.  
1.6 The Council can either support or object and recommend conditions to be
imposed if consent is granted by Scottish Ministers.  If an objection is raised by
the Council, Scottish Ministers are obliged to hold a Public Local Inquiry (PLI) if
they are minded to grant consent. They can also choose to hold a PLI in other
circumstances at their own discretion. Any Inquiry would be conducted by a
Reporter appointed by the Directorate for Planning and Environmental Appeals.
If consent is granted the Council as Planning Authority is responsible for the
agreement of matters pursuant to conditions, ongoing monitoring, and
enforcement.

Page 16

1.7 This report considers the relevant policy considerations, planning merits, views of
consultees and representations. It recommends views to be conveyed to the ECU
for consideration before a decision is made.  
2. BACKGROUND 
2.1 An extension was requested from the ECU in May to enable objections to be
resolved from NatureScot, RSPB Scotland, and National Air Traffic Services and
a consultation response to be received from the West of Scotland Archaeology
Service. This request was refused, and a holding objection was submitted which
requested that the ECU postpone making a decision on the application until the
outstanding matters had been resolved and the Council provides a further
response. Apart from the outstanding NATS objection all matters have been
resolved, and it is intended that this report and its recommendations will provide
the Council’s final consultation response to the ECU.  
3. SPATIAL AND SETTLEMENT STRATEGY  
2.1 Policy 02 – Outwith Settlement Areas establishes acceptable scales of
development in three different zones. The wind farm site is located within Remote
Countryside, which only supports specific categories of development. This
includes renewable energy related development. In principle, Policy 02 supports
renewable energy and ancillary development in these areas, providing they are
consistent with all other relevant LDP2 Policies. With respect to the requirement
for developments to accord with all other relevant policies, particular attention is
drawn to Policies 70 to 76 with respect to landscape and the natural environment.
Proposals must also demonstrate that there will be no unacceptable adverse
effects (individual or cumulative) on natural heritage, built and/or cultural heritage,
and landscape and visual amenity. 
2.2 Policy 71 – Development Impact on Local Landscape Areas (LLA)  - requires that
proposals in or affecting a LLA must demonstrate that: a) any significant adverse
effects on the landscape quality for which the area has been designated are
clearly outweighed by social, economic or environmental benefits of community
wide importance; b) The proposal is supported by a landscape and visual impact
assessment and has taken account of the content of any relevant Argyll & Bute
Landscape Capacity Assessment; and c) The location, scale, design, materials
and landscaping would be of a high standard and would safeguard or enhance
the special qualities and character of the Local Landscape Area.  Part of the
existing access and proposed temporary turning area to be located across from it
on the other side of the road would be in the West Kintyre (Coast) LLA. Given the
temporary nature of this it is acceptable subject to condition to secure submission
of the exact details and specification of the temporary turning area and
reinstatement proposals (including landscaping) for agreement with the planning
authority prior to commencement of works. A condition is also recommended to
ensure that the turning area is temporary, and use is restricted.  
2.3 Policy 04 – Sustainable Development requires that in preparing new proposals
developers should demonstrate the following sustainable development principles
(where relevant) such as: maximise the opportunity for local community benefit;
support existing communities and maximise the use of existing infrastructure and
services; conserve and enhance the natural and built environment and avoid
significant adverse impacts on biodiversity, natural and heritage assets; respect

Page 17

the landscape character of an area and the setting and character of settlements;
avoid places with significant risk of flooding, or ground instability and avoid having
significant adverse impacts on land, air and water environment.  This application
is supported by an EIAR which sets out in detail the measures proposed to ensure
the proposal is ‘Sustainable Development.’  
2.4 Policy 11 – Energy of NPF4 and Policy 30 – Sustainable Growth of Renewables
LDP2 provide the primary policy framework for assessing renewable energy
proposals. In this case, due to the outstanding objection from National Air Traffic
Services the proposal is contrary to development plan policy relating to the spatial
and settlement strategy which requires proposals to be consistent with all relevant
policies.  
2.5 Having due regard to the above, this proposal is contrary to the provisions
of LDP 2 Policy 02 – Outwith Settlement Areas and LDP Policy 04 –
Sustainable Development.  
3. ENERGY & SUPPORTING THE SUSTAINABLE GROWTH OF RENEWABLES  
3.1 Argyll & Bute Council is keen to ensure that Argyll & Bute continues to make a
positive contribution to meeting the Scottish Government’s targets for renewable
energy generation. These targets are important given the compelling need to
reduce our carbon footprint and reduce our reliance on fossil fuels, reinforced by
the Climate Change (Emissions Reduction Targets) (Scotland) Act 2019. The
Council will support renewable energy developments where these are consistent
with the principles of sustainable development, and it can be adequately
demonstrated that there would be no unacceptable significant adverse effects.  
3.2 This proposal has been assessed primarily against the two lead Statutory
Development Plan policies relating to renewable energy, Policy 11 – Energy of
NPF4 and Policy 30 – the Sustainable Growth of Renewables of LDP2. Other
policies are referred to where relevant.  
4. LOCATION, NATURE, AND DESIGN OF PROPOSAL  
4.1 The proposal is located off the A83, at approx. 2.5km east of Tayinloan, on the
Kintyre Peninsula. The site extends to approx. 1,052 ha and comprises upland
plateau moorland and conifer forest, locally known as the Killean Estate.  
4.2 Within the site are several small lochs, from north to south these include Loch
Dirigadale, Loch a' Ghlinn Bhig, Loch Luireach, Loch Fionn-Ghleann and Loch na
Naich. Several watercourses also run through the site - primarily the tributaries of
Allt Chaltuinn to the north and Killean Burn to the west. Killean Burn passes
through the west of the site and flows westwards into the Sound of Gigha. 
4.3 The A83 passes northwards, approx. 1km to the west of the western boundary of
the site.    
4.4 Proposed Development – the main components are: 
• Up to 9 wind turbines, each with a maximum tip height of 180m

Page 18

• At each wind turbine, associated low to medium voltage transformers and
related switchgear
• Permanent wind turbine foundations
• Hardstanding areas for crane erection at each wind turbine
• Two new watercourse crossings and 14 existing crossings which may need
to be upgraded
• Approx. 10.5km of access tracks, comprising 5.58km of new tracks and
4.92km of existing tracks to be upgraded
• Upgraded site access from the existing junction with the A83
• Temporary turning area to facilitate access on opposite side of road to site
access
• Onsite underground electrical cables and cable trenches
• Substation compound
• A temporary construction compound for office welfare and materials storage
• Up to 6 borrow pit search areas
• The potential for onsite concrete batching, the location of which would be
confirmed prior to commencement of development once need is confirmed
• Felling of 41.3ha hectares of forestry and associated compensatory planting.
• Habitat management and biodiversity improvements as set out in Outline
Biodiversity Enhancement Management Plan (OBEMP)  
4.5 It is anticipated that construction would take approx. 15 months, depending upon
seasonal working and weather conditions. The proposal is expected to operate
for up to 50 years following which decommissioning of the wind turbines and other
infrastructure would be undertaken. 
Infrastructure  
4.6 Connection to Electricity Grid – The proposal would be connected at Carradale
Substation, located approx. 11.2km southeast of the site. The connection would
be comprised of buried 132kV cables and/or Overhead lines (OHL). The exact
arrangement of this grid connection is subject to detailed design by SSEN
Transmission, the Transmission Operator (TO). Any final grid connection route
and associated consents would be the responsibility of the TO and this route
would require further studies and would be subject to a separate consenting
process.  
4.7 Scottish Water – have advised the ECU that they have no objection. Advice is
provided on Drinking Water Protected Areas, and Surface Water.  
4.8 Drinking Water Protected Areas – they have confirmed there are no Scottish
Water drinking water catchments or water abstraction sources, which are
designated as Drinking Water Protected Areas under the Water Framework
Directive, in the area that may be affected by the proposal.  
4.9 Surface Water – for reasons of sustainability and to protect customers from
potential future sewer flooding, Scottish Water have advised that they will not
accept any surface water connections into their combined sewer system.  
4.10 Private Water supplies (PWS) – SEPA have not provided any advice on private
water supplies.

Page 19

5. NET ECONOMIC IMPACT, INCLUDING LOCAL AND COMMUNITY SOCIO-
ECONOMIC BENEFITS  
5.1 Policy 11 – Energy of NPF4 states that proposals will only be supported where
they maximise net economic impact, including local and community socio-
economic benefits such as employment, associated business, and supply chain
opportunities. Policy 30 – the Sustainable Growth of Renewables of LDP 2
requires all applications for wind turbine developments to be assessed in terms
of net economic impact, including local and community socio-economic benefits
such as employment, associated business, and supply chain opportunities.  
5.2 Socio-Economic Impact - The proposal would deliver some economic benefits
during its construction and operation. It is estimated that during construction, the
proposal could generate £5.9 million Gross Value Added (GVA) and 80 jobs in
Argyll & Bute and £18.1 million GVA and 260 jobs in Scotland. During the
operational phase, annually the proposal could generate £0.3 million GVA and 3
jobs in Argyll & Bute; and £1.1 million GVA and 12 jobs across Scotland.  
5.3 The Applicant has stated that through local partnerships they will support
communities to develop skills sought after within the onshore wind sector, to
secure jobs and optimise the opportunities associated with the proposal. They
have also committed to prioritise local companies in the provision of contracts
during construction and operation.  
5.4 The proposal will contribute to public finances through the payment of non-
domestic rates, which could amount to £0.7 million annually, or £35.6 million over
a 50-year operational lifetime. This will support the funding of local public services
in the context of challenging public sector finances.  
5.5 To support local ambitions and needs, it has become customary practice to offer
community benefit funding, with Scottish Government guidance suggesting
£5,000 per annum per installed MW. This level of funding would generate around
£0.3 million every year for the local economy, equivalent to £14.9 million over the
lifetime of the wind farm and could support up to 5 jobs locally.  
5.6 The local area also could take part in the Applicant’s Local Electricity Discount
Scheme, reducing the household energy bills in the community, as well as shared
ownership options.  
5.7 The latest position from the Applicant is they now have internal approval to
formally offer a revenue share to the community. It is anticipated that the
Information Memorandum will be ready for presentation to the community groups
around the date of committee. They expect to be able to offer the Community an
opportunity to purchase up to 5% of the project post construction.  
5.8 The economic benefits associated with this proposal relating to job creation and
benefits to the local economy from the influx of construction workers, by spending
on accommodation, eating out and visiting local attractions are a relevant
consideration, which has been considered. Community Benefit is not however, a
‘material planning consideration’ in the determination of planning applications, as
there is no planning mechanism available to secure it. If consent were to be
granted, the negotiation of any community benefit either directly with the local

Page 20

community or under the auspices of the Council, would take place outside the
application process.  
5.9 Having due regard to the above it is considered a degree of net economic
impact including local and community socio-economic benefits typical of
such developments will be provided. It is therefore concluded that the
proposal is consistent with the provisions of Policy 11 – Energy of NPF4
and Policy 30 – The Sustainable Growth of Renewable of LDP2 in this
regard.  
6. IMPACTS ON COMMUNITIES AND INDIVIDUAL DWELLINGS, INCLUDING
RESIDENTIAL AMENITY, VISUAL IMPACT, NOISE AND SHADOW FLICKER  
6.1 Policy 11 – Energy of NPF4 requires that project design and mitigation will
demonstrate how impacts on communities and individual dwellings, including
residential amenity, visual impact, noise, and shadow flicker have been
addressed. Policy 30 – the Sustainable Growth of Renewables of LDP2 requires
all applications for renewable developments to be assessed in terms of impacts
on communities and individual dwellings, including visual impact, residential
amenity noise, and shadow flicker (including cumulative).   
Noise  
6.2 ABC Noise Consultant – has advised that good practice has been adopted by the
applicant, with a few minor issues identified. The most significant of these issues
are: 
• The study area for Killean wind farm includes receptors that are exposed to
noise levels from the operational Deucheran wind farm and consented
Clachaig Glen wind farm. It has been shown that the application of
apportioned noise limits will be necessary to ensure cumulative noise impacts
do not exceed the derived noise limits at some receptors. It is recommended
that the Applicant considers this and suggests suitable values. 
• The omission of the details of any screening attenuation and concave ground
corrections that have been applied. The inclusion of the applied values in the
reporting is suggested within good practice but is not a formal requirement,
however, it has potentially led to an inability to accurate replicate the
applicant’s calculations. 
• The receptor labelled H27 ‘South Beachmore Farm’ is incorrectly named ‘High
Crubasdale’ in Tables 11.7, 11.8, 11.9 and 11.10. 
• Confirmation that there are no derelict properties with residential planning
status in the study area. 
• The proposed noise condition does not contain the partial levels. Nor include
a suitable control for amplitude modulation. 
6.3 Following a satisfactory response, it is considered that there would be no reasons
to object on noise grounds.  A suitably worded condition to limit the noise levels,
tonality and amplitude modulation should be applied to control noise levels from

Page 21

the proposed development.  A revision based on the proposed condition should
be provided.  
6.4 Applicant’s response to Noise Consultant – they have considered the Noise
Consultants review and note that some minor points have been raised. They will
be pleased to agree wording for a revised noise condition which will include
updated limits that more thoroughly account for potential cumulative operational
impacts and that include controls for amplitude modulation (AM). This will provide
further comfort that the overall requirements of ETSU-R-97 will be met in practice.
They consider that this can be addressed during the agreement of conditions
process. Additionally, they acknowledge the error highlighted in the Councils
Noise Consultants review relating to receptor location coordinates and will be
happy to correct this. Finally, they confirm that from their understanding, the
previous consent for the reinstatement of a residential dwelling at Braids has now
lapsed and there are no derelict properties with residential planning status in the
study area.  
6.5 ABC Noise Consultant - have reviewed the clarifications provided by the applicant
and would respond as follows. They agree that the apportioned limits can be
agreed with the conditions (if consent is granted). They note that no further
information on screening or valley correction has been provided – it will be the
applicant’s responsibility to ensure the agreed noise limits can be met. They are
unable to verify this in the absence of this information. Confirmation of typos is
fine. Confirmation that there are no derelict properties is fine. Confirmation that
the applicant will accept an AM condition is also fine. On that basis, they would
conclude that satisfactory clarifications have either been provided or can be dealt
with at the conditions stage of the application, and therefore their previous
conclusions regarding the acceptability of the scheme still stand. 
Shadow Flicker  
6.6 A shadow flicker assessment is required when any properties lie within 10 rotor
diameters of a wind farm. This is in line with Scottish Government online
renewables planning advice on ‘onshore wind turbines’ which states that: “where
separation is provided between wind turbines and nearby dwellings (as a rule 10
rotor diameters), ‘shadow flicker’ should not be a problem.”  
6.7 Analysis was performed on all properties within ten rotor diameters of any turbine.
This shadow flicker assessment is based on turbines with a 155m rotor diameter,
and a 100m micro-siting allowance for infrastructure. As such, this 100m distance
is added to the ten-rotor diameter (1,550 = 10 * 155) m distance to give a total
distance of (1,650 = 1550 + 100) m from any turbine. Analysis was undertaken
for shadow flicker at all properties within 1,650m from any wind turbine.  
6.8 With an allowance for 100m micro-siting, there are no inhabited houses within
1,650m of any wind turbine and thus no flicker is predicted. A property referred to
as Braids is scoped out of the assessment as it is uninhabited and would require
planning permission to make habitable. The building currently lacks a roof,
windows, and some walls, and is therefore not considered to be a building used
for long-term residential purposes. It is therefore concluded that Killean Wind
Farm will not cause a material reduction to residential amenity owing to shadow
flicker.

Page 22

6.9 Having due regard to the above, subject to the conditions recommended by
the Councils Noise Consultant being attached to any grant of consent it is
considered that the proposal is consistent with the provisions of Policy 11-
Energy, and Policy 30 – The Sustainable Growth of Renewables of the LDP2
in this respect.  
7. SIGNIFICANT LANDSCAPE AND VISUAL IMPACTS  
7.1 Policy 11 – Energy of NPF4 requires that project design and mitigation
demonstrate how significant landscape and visual impacts have been addressed,
recognising that such impacts are to be expected for some forms of renewable
energy. Where impacts are localised and/or appropriate design mitigation has
been applied, they will generally be considered acceptable. Policy 4 a) - Natural
Places of NPF4 states that proposals which by virtue of type, location or scale will
have an unacceptable impact on the natural environment will not be supported.
Policy 30 – The Sustainable Growth of Renewables of LDP2 requires all
applications for wind turbine developments are assessed against landscape and
visual impacts.  
7.2 The Council’s Consultant Landscape Architect - has undertaken a review of the
landscape and visual effects of the proposal.  
7.3 The proposal - A previous application for a wind farm on a similar site was refused
following a Public Local Inquiry held in 2019. This original application comprised
a development of 15 turbines, 149.9m high to blade tip and extended more to the
east than the current proposal with around 6 turbines being located on open
moorland. The current application comprises 9 turbines up to 180m high to blade
tip. Most of the turbines are located within a conifer plantation with 3 turbines lying
in more open ground close to the woodland edge.  
7.4 A Design Statement has been produced which outlines opportunities, constraints
and decision-making influencing the design. This document notes the previous
application for a wind farm on this site and its refusal in 2019. It outlines the
changes that have occurred to Scottish planning policy since then with the
adoption of NPF4. It states that there is recognition that the reasons for refusal of
this previous scheme are important but that it is not possible to remove all
landscape and visual impacts given the increase in turbine height and it is
acknowledged that ‘in many instances the visual effects that would arise would
be of a similar nature’. One of the key aims has been to avoid a notable increase
in visual impact when compared with the previous scheme and the document
seems to express the view that the reduction in the number of turbines from 15 to
9 would be key to achieving this. 
7.5 The Landscape and Visual Impact Assessment (LVIA) - accords with the
Guidelines for Landscape and Visual Impact Assessment 3rd Edition (GLVIA3).
The visualisations are clear and consistent with best practice guidance although
the maps showing viewpoint locations are too small to read.  
7.6 The Council’s Consultant Landscape Architect considers that the LVIA generally
under-estimates landscape and visual effects. They have reviewed the findings
from the original Killean LVIA and note some key differences with the judgements
made in the LVIA for the current scheme. The LVIA for the original scheme
concluded that significant effects would occur on a larger number of Landscape

Page 23

Character Types (LCTs) and on views from the Islay Ferry and Knapdale whereas
the current LVIA does not. The current proposal has a smaller number of turbines
although these are over 30m higher than the turbines proposed in the original
scheme. The extent of visibility of the proposal (despite the reduction in the
number of turbines) is similar to that of the original scheme.  
7.7 The Argyll & Bute Landscape Wind Energy Capacity Study 2017 - The proposal
lies within the Upland Forest Moor Mosaic (6) Landscape Character Type (LCT).
The Argyll & Bute Landscape Wind Energy Capacity Study (ABLWES) finds the
combined landscape and visual sensitivity of this landscape to be high-medium
to wind turbines >80m high.  
7.8 The study identifies major constraints as potential cumulative effects with other
wind farms. It notes that while no designated landscapes apply to this LCT, it
abuts a coastal APQ in places and turbines visible on prominent skylines above
the coastal fringe may indirectly affect special qualities. Key cumulative issues
are highlighted in the study and these include: ‘Larger turbines and/or more
extensive wind farm developments sited on the outer edges of the Kintyre uplands
where they would be likely to significantly increase landscape and visual impacts
on the settled coastal edge of Kintyre and on views from Arran and Gigha and
would also further erode the established pattern of wind farm developments
largely associated with the less sensitive core of these uplands’.  
7.9 The guidance set out for the Upland Forest Moor Mosaic LCT advises that there
is very limited scope for additional large typology turbines to be accommodated
within this landscape principally due to potential cumulative effects that could
occur on the coastal fringes of Kintyre and on views from Arran and Gigha. The
guidance advises that significant intrusion on adjacent settled and small-scale
landscape character types and on Arran and Gigha should be avoided by siting
larger turbines well back into the interior of these uplands.    
7.10 Effects on landscape character - The LVIA finds that significant effects would arise
on the character of the Upland Forest Moor Mosaic LCT within which the
proposed wind farm would be sited. The Council’s Consultant Landscape
Architect agrees with this finding and with the judgement that these effects would
extend up to around 6km or so from the wind farm. The LVIA concludes that there
would be no significant effects on any other LCT within the LVIA study area.  
7.11 Contrary to the findings of the LVIA, the Council’s Consultant Landscape Architect
considers that the wind farm would incur significant adverse effects on the Coastal
Plain LCT which forms a triangular and flat area of farmland, woodland and moor
extending west to Rhunahaorine Point. This is a small LCT, and effects would be
widespread. The Council’s Consultant Landscape Architect also disagrees with
the judgement made in the LVIA regarding effects on the character of the Coastal
Parallel Ridges LCT which covers the whole of the island of Gigha. Gigha lies less
than 3km from the west coast of the Kintyre peninsula at its closest point across
the narrow Sound of Gigha. The very large turbines would be prominent in views
from Gigha and from the Sound of Gigha and the Council’s Consultant Landscape
Architect considers that significant adverse effects would occur on the sense of
remoteness and naturalness associated with the island and the immediate waters
surrounding it. It should be noted that the recent consent of the Clachaig Glen II
wind farm will diminish the current perceptual qualities associated with Gigha and
its immediate seascape if constructed.

Page 24

7.12 There would also be some localised adverse effects on the Rocky Mosaic LCT
where the proposal would be seen principally in the vicinity of Glenacardoch Point
and where the creation of the access off the A83 would involve the removal of
vegetation and road widening near Killean. Sections of hedgerow are proposed
to be removed near the site access. Some removal of trees near the site access
also formed part of the previous proposal considered at PLI but this does not
appear to be mentioned in the EIAR. While the Council’s Consultant Landscape
Architect considers that there will be some significant adverse effects on parts of
the Rocky Mosaic LCT, they will be limited in extent and effects on this LCT would
not be widespread. 
7.13 Effects on designated landscapes - The proposal is not located in a designated
landscape but would lie within 1.7km of the West Kintyre Coast Local Landscape
Area (LLA). There is no citation for this, but it principally comprises settled and
more intricately patterned coastal fringes with key special qualities likely to
comprise a diverse landform and landcover pattern and views along the coast and
out to sea to the west to Gigha, Islay and Jura. The LVIA concludes that the
proposal would not have significant effects on this LLA. It is considered that there
would be significant adverse effects on some of the key qualities of this LLA but
that overall, the integrity of the designation would not be compromised given the
limited visibility of the proposal particularly from the more diverse parts of the
coast and lack of intrusion in westward views.        
7.14 Visual effects - The location of the proposal on west-facing outer slopes of the
Kintyre peninsula would increase visibility from the sea, coast, and Gigha. It is
considered that significant adverse effects on views would principally occur from
the following locations:   
• The Kintyre Way where the proposal would be seen at close quarters as the
route is aligned through the site. VP’s 1 and 2 illustrate the close views that
would occur from this nationally important route. While the proposal would be
seen from the Kintyre Way where it is aligned along the coast in the vicinity of
Rhunahaorine Point, effects would be particularly severe along approx. 7km
of the route east of Tayinloan. The proposal would be likely to introduce new
visibility of a large-scale wind energy development along approximately 5km
of the route but would be seen together with the consented Clachaig Glen II
wind farm principally between the eastern edge of the site and Loch na Naich
for around 2km distance (The cumulative ZTV Figure 5.36 indicates
theoretical visibility of the Clachaig Glen II within Killean Glen and across the
Killean wind farm site but from field observations it is considered that
woodland (including non-productive woodland aligning the Killean burn) and
local landform features would be likely to screen views so that the Killean wind
farm would only be seen from this part of the Kintyre Way). Both
developments would be likely to result in an overwhelming effect for walkers
who would be surrounded by very large wind turbines.   
• The Sound of Gigha and Gigha - The proposal would be visible across much
of Gigha and the Sound of Gigha. There will be fairly consistent visibility of the
proposal from the single-track road which runs the length of Gigha, from
settlement which is principally located on the more sheltered eastern side of
the island and from walking routes along the coast and on the hills on the
higher spine of the island. These views are illustrated by VP’s 6 and 8. The
recently consented Clachaig Glen II wind farm would have a similar visual
influence in views from the Sound of Gigha and Gigha. Both wind farms would

Page 25

appear to lie near each other and would increase the extent of visibility of wind
turbines seen on the skyline of the Kintyre uplands   
• The west Kintyre coast - there would be extensive visibility of the proposal
from the open Coastal Plain (VP 3 from Tayinloan jetty, VP 4 Point Sands).
There would also be visibility in the vicinity of Glenacardoch Point. (The A83
is tucked into the base of rising and often wooded slopes and the raised beach
edge south of Clachan and views of the proposal would be limited from this
route as it traverses the western coast of Kintyre). The recently consented
Clachaig Glen II wind farm will be seen in close association with this proposal
and would increase the extent of large wind turbines seen on the skyline of
hills to the east from the coast.   
• Knapdale - There would be visibility of the proposal from the southern part of
the Knapdale peninsula with this likely to be restricted to more open coastal
locations due to the extensive woodland present. More distant operational
wind farms located in the central part of the Kintyre peninsula are already
clearly seen in the view but are not prominent due to the size of turbines, their
partial screening by landform and their distance. Viewpoint 11 from the B8204
illustrates how the turbines will appear overly large in relation to the height of
the northern uplands of the Kintyre peninsula increasing the impact on views.
It should be noted that the recently consented Clachaig Glen II wind farm
would appear to overlap with this proposal from this part of Knapdale. If built,
this consented scheme would lessen the effects of the proposal from this
location.   
• The Islay Ferry - Similar to the account of views from Knapdale above, the
Council’s Landscape Architect considers that while alone the proposal would
incur significant adverse effects due to its size and prominent position on east-
facing slopes as the ferry approaches West Loch Tarbet, should the
consented Clachaig Glen be built, these effects would be reduced where both
schemes appear to overlap.  
7.15 The LVIA concludes that significant night-time effects would arise from three
viewpoints (two of these along the Kintyre Way at Killean and Loch na Naich VPs
1 and 2). The Council’s Landscape Architect considers that night-time lighting
would additionally extend the duration of significant effects from the Sound of
Gigha and from Gigha (the night-time visualisation from VP6 at Ardminish is
useful but it cannot compare with the brightness of wind turbine lighting seen in
the field).  
7.16 Residential Visual Amenity Assessment - The Residential Visual Amenity
Assessment (RVAA) identifies 12 residential properties lying within 2km of the
proposal. One of these properties (Braids which lies very close to the wind farm)
is uninhabited and 8 properties (lying in the vicinity of Largie Farm on lower
wooded slopes) have no theoretical visibility of the proposal due to the screening
provided by landform and trees. The RVAA found that effects on the remaining 3
properties would not be significant. Although the Councils Landscape Architect
has not been able to visit each of the properties considered in the RVAA, based
on the visual material produced in the LVIA, they consider the findings to be
reasonable.

Page 26

7.17 Cumulative landscape and visual effects with other proposed wind farms - This
proposal has greatest potential to incur significant adverse cumulative effects with
the consented Clachaig Glen II wind farm which lies within 1km to the south.
Significant adverse combined cumulative effects would occur on landscape
character and on views from the Kintyre Way, the Sound of Gigha and Gigha. The
Killean proposal will increase the horizontal extent of turbines seen on the upland
skyline but, in a scenario where the Clachaig Glen II proposal is constructed, it
would not introduce new larger wind turbines to views. 
7.18 Conclusions - A key aim of the design has been to avoid a notable increase in
visual impact when compared with the previous Killean scheme which was
refused in 2019. The location of the previous scheme on open west-facing slopes
opposite Gigha and the size of the turbines were key factors influencing significant
landscape and visual effects and the reasons for refusal. While this proposal has
fewer turbines, they are larger. There have been some improvements to the siting
of turbines but only as far as turbines have been removed from sensitive open
moorland to minimise effects on Golden Eagles. The site still comprises west-
facing slopes lying on the outer edges of the Kintyre peninsula which are more
open to views from the Kintyre coast and Gigha and its immediate seascape. The
Councils Landscape Architect considers that some of the objectives identified in
the Design Statement, for example the aim to offset the distance between turbines
and the Kintyre Way, would achieve no meaningful mitigation in terms of reducing
the prominence of very large wind turbines seen near this route. 
7.19 The previous Clachaig Glen wind farm proposal was preferred at the conjoined
inquiry held with Killean in 2019 principally because of its reduced landscape and
visual effects. This was due in part to its more visually contained siting and smaller
turbines (115-126m high to blade tip). The Clachaig Glen II proposal (comprising
larger turbines than the original consented scheme) was recently consented on
appeal in November 2024. The reporter considered that while this wind farm
would have significant effects on landscape character extending 3km from the
development, it would not harm the West Kintyre LLA, would not dominate the
settled small scale Rocky Mosaic LCT or affect or detract from the character of
the coast. In terms of the effects on views, the Reporter concluded that significant
effects would occur on Gigha and the Sound of Gigha, the Kintyre Way, and Point
Sands but it would not intrude on views from the west. The Councils Landscape
Architect considers that the Clachaig Glen II significantly increases the intrusion
on Gigha and the Sound of Gigha when compared with the original Clachaig Glen
scheme which comprised smaller turbines and additionally benefitted from some
screening by landform. 
7.20 Changes have occurred to national planning policy since the 2019 Conjoined
Killean and Clachaig Glen Wind Farms PLI. NPF4 Policy 11e ii states that
significant landscape and visual impacts are to be expected for some forms of
renewable energy and where impacts are localised and/or appropriate design
mitigation has been applied, they will be acceptable. NPF4 provides no guidance
on the definition of what constitutes ‘localised’ effects. 
7.21 The proposal would have significant adverse effects on landscape and coastal
character and on the character of the island of Gigha. Significant adverse effects
on views will principally occur from Gigha Sound, from the settled eastern coast
and small spine of hills on Gigha, the Kintyre Way and the Rhunahaorine
Point/Point Sands area. Visible aviation lighting of 4 turbines will increase the
duration of adverse effects on views.

Page 27

7.22 Cumulative landscape and visual effects would principally arise between the
consented Clachaig Glen II wind farm and this proposal. As there is a strong
likelihood that the consented Clachaig Glen II scheme will be constructed, it is
important that the Killean proposal is not considered in isolation. In many key
views, for example from Point Sands (VP4) and from Gigha (VPs 6 and 8), the
Killean proposal will appear as an extension to Clachaig Glen II, exacerbating
significant adverse effects, for example, in terms of increasing the extent of
turbines seen on skylines looking east but not being the first to introduce new
much larger and more prominent wind turbines to the scene. Put simply, the
consent of Clachaig Glen II will already incur significant adverse effects on key
views from Gigha, Gigha Sound and part of the west Kintyre coast and this will
reduce landscape and visual sensitivity and the magnitude of change likely to
occur should the 9 turbines of the Killean proposal be added in a similar location.
This is confirmed by the cumulative wirelines produced in the EIAR for VPs 4, 6
and 8. In views from the A83 both wind farms will generally be seen together with
the presence of Clachaig Glen II, in VP 9 near Clachan for example, likely to result
in the effects of the Killean proposal being not significant if subsequently
constructed. A similar reduction in the sole effect of Killean would occur from VP
11 in Knapdale if Clachaig Glen II were present. 
7.23 Recommendation in terms of landscape and visual matters - The proposal would
have similar significant adverse landscape and visual effects to the previous
proposal which was refused in 2019. Changes to national planning policy and the
consent of the Clachaig Glen II wind farm have a bearing on the decision to be
made on the acceptability of this proposal in terms of its landscape and visual
effects. While the Councils Landscape Architect considers that the effects of this
proposal on its own could be termed more than local in extent because of the
significant effects on landscape/coastal character and on views from Gigha and
the Sound of Gigha that would arise (lying up to 9km distance), the likely
construction of the Clachaig Glen II wind farm would moderate these effects. The
Councils Landscape Architect therefore recommends that no objection should
be raised in respect of landscape and visual interests subject to the following
conditions being imposed:   
Visible aviation lighting - The Applicant’s proposal for a condition to allow for
implementation of an Aircraft Detection Lighting System (outlined in the Schedule
of Mitigation) Chapter 14 of the EIAS is welcomed. While the Clachaig Glen II
reporter’s findings on conditions requiring periodic review of aviation lighting are
acknowledged the Councils Consultant Landscape Architect considers that the
large number of wind farm proposals across Argyll & Bute requiring aviation
lighting is a major concern and such a condition is imperative to reduce the
cumulative landscape and visual effects of such lighting   
Woodland and wider landscape mitigation and enhancement – the Councils
Landscape Architect considers that the Applicant should adopt a more ambitious
approach to forest restructuring using the wind farm development as a catalyst
for more effective and speedier restructuring of productive forestry which would
enhance both landscape character and biodiversity and fit with the aims of NPF4
Policy 3. Wider landscape enhancement should also be undertaken as should
measures to ensure the longevity of screening woodland. A condition should be
set up to require the applicant to undertake:

Page 28

• Substantial increases in broadleaved planting as part of the wind farm
restocking plan (the increases above the agreed forest plan which are
currently proposed are relatively small) including riparian planting across the
wider Killean estate (both new woodlands and management and expansion
of existing riparian woodlands, for example those within the valley of the
Killean Burn). 
• Redesign of the outer margins of productive woodland (this tying in where
appropriate with measures set out in the BEMP to enhance Black Grouse
habitat) to remedy hard angular edges and improve the fit of plantations with
landform. 
• Compensatory planting should be undertaken within the Killean Estate. Argyll
& Bute Council should be consulted, in addition to Scottish Forestry, on the
location, extent and composition of this planting. 
• Management of existing mature mixed woodlands in the vicinity of Killean
House including new planting to retain and enhance screening of the
proposed wind farm from the coast and protect the landscape setting provided
to the Killean Estate buildings and St John’s Church (as seen in Cultural
Heritage Figure 6.4)  
7.24 Key visualisations for the Committee to review include: VP1: Loch na Naich –
Kintyre Way, VP2: Killean – Kintyre Way, VP3: Tayinloan Jetty, VP4: Point Sands,
VP6: Ardminish Bay, Gigha, VP8: Creag Bhan, Gigha, VP9: A83 near Clachan
(Sheet A illustrates how the proposal would be seen together with Clachaig Glen
2), and Figure 6.4: Killean Estate Buildings  
7.25 NatureScot – in summary, have advised the ECU while there are significant
adverse landscape and visual effects, these do not raise issues of national
interest. Furthermore, they defer to Argyll & Bute Council and North Ayrshire
Council in terms of effects on locally designated landscapes. NatureScot advise
that the nature and scale of the proposal at this location is such, that it cannot be
accommodated without significant adverse landscape and visual effects,
including cumulative effects and night-time effects. They consider that given the
proposed siting, scale, and type of development, it would be very challenging to
overcome the significant adverse effects identified within the site parameters.
They would encourage the Applicant to reconsider the design, particularly where
the proposal would have significant adverse effects on parts of the west coast of
Kintyre, the Isle of Gigha, and the Sound of Gigha. This is likely to require a
reduction in the vertical height of the turbines which may reduce some of the
severity of effects. 
7.26 North Ayrshire Council - advised the ECU that consideration should be given to
the potential impacts of the North Arran NSA when determining the application. 
Officer’s Conclusion  
7.27 Based on the advice of the Council’s Landscape Architect, NatureScot, and North
Ayrshire Council it is concluded that the proposal does not warrant an objection
on landscape and visual grounds. This is however subject to the conditions
recommended by the Councils Landscape Architect being attached if the proposal
receives consent.

Page 29

7.28 Having due regard to the above subject to the conditions recommended by
the Councils Landscape Architect being attached to any grant of consent it
is concluded that the proposal complies with the provisions of Policies 11
– Energy and 4 – Natural Places of NPF4, and Policy 30 – The Sustainable
Growth of Renewables of LDP2 in this respect.  
8. IMPACTS ON TOURISM AND RECREATION    
8.1 Policy 11 – Energy of NPF4 does not require impacts on tourism to be considered.
Policy 30 – The Sustainable Growth of Renewables of LDP2 requires all
applications for wind turbine developments to be assessed against impacts on
tourism and recreation.  
8.2 Tourism – Policy 11 of NPF4 does not include a requirement for the impact of
proposals on tourism to be assessed. However, Policy 30 – The Sustainable
Growth of Renewables of the LDP does. In Argyll & Bute the landscape is
regarded as being a particularly valued asset both in terms of its intrinsic qualities
and in terms of its value to the tourism economy. For all types of development,
the maintenance of landscape character is an important facet of decision-making
in the countryside in Argyll & Bute, regardless of the scale of development
proposed.  
8.3 As Tourism and Landscape & Visual matters are intrinsically linked, and there is
little evidence to demonstrate whether wind farms adversely affect tourism, it is
considered that such impacts are covered in the landscape and visual impact
assessment of the proposal. 
8.4 Having due regard to the above it is considered that the proposal is
consistent with the provisions of Policy 11 – Energy of NPF4 and Policies
04 – Sustainable Development and 30 – The Sustainable Growth of
Renewables of ABLDP2 in this respect.  
9. PUBLIC ACCESS    
9.1 Policy 11 – Energy of NPF4 requires that project design and mitigation
demonstrate how impacts on public access are addressed, including impact on
long distance walking, and cycling routes and scenic routes. Policy 30 – the
Sustainable Growth of Renewables of LDP2 requires all applications for wind
turbine developments to be assessed against impacts on public access, including
impact on long distance walking and cycling routes and those scenic routes
identified in NPF4. Policy 32 – Active Travel of LDP2 requires active travel and
recreation to be integrated in developments from the start of the wider design
process and existing active travel networks should be safeguarded and integrated
with the development. 
9.2 The Council’s Access Officer has advised that the 9 wind turbines will be visible
for over 5 miles of the Kintyre Way which is the most heavily used path in the area
affected by the proposal being popular with walkers, cyclists, and horse
riders.     The height of the turbines is understood to be 180m and this is
inevitable.  This is the latest of around 16 wind farms in operation or under
construction in the Kintyre area.   The Access Officer does not know whether this
concentration of wind farms has had a positive or negative effect on tourism in
the area.   The 9 turbines will be close to the Kintyre Way; however, this will not

Page 30

be the only location where this is the case.  This is not unique to the Kintyre Way
with many long-distance paths in Scotland and the rest of the world passing close
to wind farms.    
9.3 The Access Officer is concerned that the developer has not produced an Access
Plan which details how they will manage public access during the construction
phase, especially the upgrading of the main access road which is a designated
Core Path C094(b) and follows the route of the Kintyre Way.  The developer and
their contractors are required to keep the Core Path open throughout the works
and will need to manage the construction to allow this.   Elsewhere contractors
have been able to upgrade forestry tracks without closing them to the public
although this has required additional planning and the employment of banksmen
etc.   Whilst it is permissible to divert sections of the route on to adjacent routes
this will require a Section 208 Path Diversion Order for which the developer should
allow at least 8 weeks for consultation.  This is only possible for one part of the
affected section of the Core Path and some improvements to the alternate route
via Braids may be required before it can be used, as will the permission of the
landowner.  
9.4 In summary the Access Officer does not have any objection to the proposed wind
farm.  The Applicant will need to consider how they manage the construction
phase of the project to ensure that the public can continue to exercise their legal
rights of access, and the Access Officer is happy to discuss this with them at that
stage.  A condition requiring the developer to prepare an Access Plan for approval
by the Council prior to the commencement of construction will ensure that this
happens.  The Access Officer is also happy to meet the developer and the
contractor to advise on the draft Access Plan prior to its submission. 
9.5 Having due regard to the above subject, to the condition to secure an
Access Plan being attached to any grant of consent it is considered that the
proposal is consistent with the provisions of Policy 11- Energy of NPF4,
Policy 30 – the Sustainable Growth of Renewables; and Policy 32 - Active
Travel of the LDP2.  
10. AVIATION AND DEFENCE INTERESTS INCLUDING SEISMOLOGICAL
RECORDING   
10.1 Policy 11 – Energy of NPF4 requires that project design and mitigation
demonstrate how impacts on aviation and defence interests including
seismological recording have been addressed. Policy 30 – the Sustainable
Growth of Renewables of LDP2 requires impacts on aviation and defence
interests and seismological recording to be addressed. Policy 43 – Safeguarding
of Aerodromes of LDP2 stipulates that development will not be permitted where it
would compromise the safe operation of an Aerodrome or Technical Site or
constrain their present or future operations.  
10.2 Defence Infrastructure Organisation (DIO) – advised the ECU that, subject to the
conditions to secure Aviation Lighting and Aviation Charting and Safety
Management, they have no objection.  
10.3 Highlands & Islands Airport initially submitted a holding objection and advised the
ECU they required an updated Instrument Flight Procedure impact assessment
report. An updated Instrument Flight Procedure impact assessment was

Page 31

submitted which confirmed the proposal will have no impact on the IFPs serving
Campbeltown Airport. Therefore, HIAL removed the holding objection and
confirmed they have no objections.  
10.4 National Air Traffic Services Safeguarding (NATS) has advised the ECU the
proposal conflicts with their safeguarding criteria. Accordingly, they object. They
further advised the ECU that it is always their preference to identify a specific
mitigation and, if possible, put in place a delivery framework before actively
offering a conditional withdrawal of their objection. However, they have confirmed
that they have an identified mitigation that with the commitment of both parties
can be delivered prior to the development commencing.  
10.5 Glasgow Prestwick Airport and Glasgow Airport have advised the ECU they have
no objection.  
10.6 Having due regard to the unresolved NATS objection it is concluded the
proposal is contrary to the provisions of Policy 11 – Energy of NPF4 and
Policies 30 – The Sustainable Growth of Renewables and 43 – Safeguarding
of Aerodromes, of the LDP2.   
Note: If NATS withdraw their objection, and the ECU is minded to grant
consent for this proposal.  Any conditions recommended by NATS to secure
any necessary mitigation and the conditions recommended by the Ministry
of Defence should be attached.  
11. TELECOMMUNICATIONS AND BROADCASTING INSTALLATIONS  
11.1 Policy 11 – Energy of NPF4 requires that project design and mitigation
demonstrate how impacts on telecommunications and broadcasting installations,
have been addressed particularly, ensuring that transmission links are not
compromised. Policy 30 – The Sustainable Growth of Renewables of LDP2
requires all applications for wind turbine developments to be assessed against
impacts on telecommunications and broadcasting installations, particularly
ensuring that transmission links are not compromised. 
11.2  BT advised the ECU that the proposal should not cause interference to their
current and presently planned radio network. Arqiva advised the ECU they have
no objection and recommend a planning condition to mitigate the impact of any
degradation of television and radio reception caused by the wind turbines. Joint
Radio Company - advised the ECU the proposal is CLEARED - subject to 100m
Micrositing (as stated in the EIAR) - with respect to radio link infrastructure
operated by the local energy networks.  
11.3 Having due regard to the above subject to the condition recommended by
Arqiva and the Joint Radio Company it is concluded that the proposal will
not have any adverse impacts on telecommunications, broadcasting
installations and transmission links (including cumulative impacts) and is
consistent with the provisions of Policy 11- Energy of NPF4 and Policy 30 –
The Sustainable Growth of Renewables of LDP2 in this respect.    
12. ROAD TRAFFIC AND ADJACENT TRUNK ROADS

Page 32

12.1 Policy 11 – Energy of NPF4 requires that project design and mitigation
demonstrate how impacts on road traffic and on adjacent trunk roads have been
addressed, including during construction. Policy 30 – the Sustainable Growth of
Renewables of LDP2 requires all applications for wind turbine developments to
be assessed against impacts on road traffic and impacts on adjacent trunk roads.
Policy 35 – Design of New and Existing, Public Roads and Private Access
Regimes of LDP2 acceptance of development utilising new and existing public
roads, private roads and private access regimes is subject to road safety and
street design issues being addressed to the satisfaction of the Roads Authority
and the Planning Authority. Policy 38 – Construction Standards for Public Roads
requires that accesses which connect to or impact significantly on a Trunk Road
require consultation with Transport Scotland.  
12.2 Transport Scotland (TS) have advised the ECU the nearest trunk road to the site
is the A83(T) which would provide access into the development via a private
access track. A turning area on the west side of the A83(T) opposite the site
access is required to assist with the right turn manoeuvre required to enter the
site. Based on the review undertaken, Transport Scotland can confirm that they
are satisfied with the submitted EIAR and have no objection to the development
in terms of environmental impacts on the trunk road network. They would,
however, request that the following conditions be attached to any consent that
may be granted: details of the proposed means of access to be submitted for
approval, the proposed route for any abnormal loads to be submitted for approval,
details of any accommodation measures to be approved and implemented, any
additional signing or temporary traffic measures must be undertaken by a
recognised QA traffic management consultant prior to the movement of any
components, Construction Traffic Management Plan (CTMP) to be submitted and
approved, and wheel washing facilities to prevent vehicles depositing debris on
the trunk road. Transport Scotland advise that in addition to the conditions the
Applicant should be informed of their advisory notes which set out the
requirements for works within the trunk road boundary.  
12.3 ABC Roads and Amenity Services - have advised they have no objection. The
site access connects directly to the A83 Tarbet - Campbeltown Trunk Road,
Transport Scotland should be notified.  
12.4 Having due regard to the above, subject to the conditions recommended by
Transport Scotland it is considered that the proposal is consistent with the
provisions of Policy 11 – Energy of NPF4, Policy 30 – The Sustainable
Growth of Renewables, Policy 35 – Design of New and Existing, Public
Roads and Private Access Regimes and Policy 38 – Construction Standards
for Public Roads in this regard.  It is recommended that the conditions
required by Area Roads and Amenity Services are attached to any consent
granted by the ECU. 
13. HISTORIC ENVIRONMENT    
13.1 Policy 11 – Energy of NPF4 requires that project design and mitigation
demonstrate how impacts on the historic environment have been addressed.
Policy 7 – Historic Assets and Places of NPF4 intent is to protect and enhance
historic environment assets and places, and to enable positive change as a
catalyst for the regeneration of places. Policy 30 – The Sustainable Growth of
Renewables of LDP2 requires all applications for wind turbine developments to
be assessed against impacts on the historic environment, including scheduled

Page 33

monuments, listed buildings and their settings. Policy 15 – Protection,
Conservation and Enhancement of Our Historic Environment, Policy 19 –
Scheduled Monuments, Policy 20 – Gardens and Designed Landscapes, and
Policy 21 – Sites of Archaeological Importance support the key policies and
provide guidance on assessing development proposals against heritage impacts. 
13.2 Historic Environment Scotland (HES) – have advised the Energy Consents Unit
that their view is that the proposals do not raise historic environment issues of
national significance, and they do not object. 
13.3 Historic Scotland advise that there are 4 Category A listed buildings immediately
adjacent to the application site boundary with the potential to be affected by the
construction of access tracks for the proposal. These are the ‘Doll’s Houses,’
Killean. The following additional Category A listed buildings may also be affected
by the proposal: Killean House (LB12005) and Killean Chapel (St John’s), Killean
Burial Ground (LB12004). There are also several nearby scheduled monuments
which may be affected. These include the following: Killean, fort NE of (SM3179),
Beacharr, standing stone & long cairn (SM182), Dun Beachaire, dun (SM3143),
and Low Clachaig, cup marked boulder 915m E of (4352).  
13.4 Whilst the proposal would be visible in key views associated with the settings of
several heritage assets, HES are content that the severity of impacts is such that
the turbines would not result in significant adverse impacts to the level where they
would object.  
13.5 They have also considered the impact of the proposed bellmouth and site access
on the setting of St John's Church, church, burial ground, and carved stones,
Killean (SM3030). This monument consists of the remains of the old parish church
of Killean and its burial ground. A simple, unicameral church was erected here
probably in the second half of the 12th century, it was altered several times of the
following centuries before being abandoned in 1770. The setting of the monument
is focused on the sense of place. Its location on the flat coastal plain meant it was
visible from much of the surrounding area. There is little modern development
west of the road which adds to a sense of separation and means that its place in
views up and down the coastline remains uncompromised.  
13.6 A bellmouth is proposed just to the north of the monument, to the west of the A83,
to facilitate the transport of turbine components approaching from Campbeltown
and turning right up the access track to the proposed wind farm. The ground will
be reinstated upon completion of turbine delivery. Whilst components are likely to
be visible from St John's and the tranquillity and isolation of the church’s setting
compromised when in use, the bellmouth will be temporary and then removed
upon completion of turbine delivery. Provided this can be ensured HES do not
object to these impacts.  
13.7 HES have also previously advised that if any trees forming the woodland
backdrop to the Killean Estate are damaged or removed by works to upgrade the
wind farm access tracks, they should be appropriately replaced.  It is
recommended that these concerns should be addressed by condition if the
proposal received consent.  
13.8 West of Scotland Archaeology Service – does not recommend an objection and
provides general comments and advice on direct and indirect physical impact

Page 34

issues and setting and cumulative impact issues. In terms of cumulative impact
WOSAS find they cannot support the proposed encroachment onto lower ground
that is more densely populated with known archaeological sites and monuments.
WOSAS does not believe that an objection solely based on predicted adverse
impacts on the historic environment would be likely to be sustained. However,
they believe that the broader impacts they have referred to might be employed to
add weight to the Landscape & Visual Impact Assessment of the proposal. Should
the Council determine to object on these or on other grounds they would be
pleased to advise further as required. Similarly, if a potential archaeological
condition or conditions are required for submission to the ECU or at a later stage,
they will be pleased to suggest a suitable form of words.  
13.9 Applicant Response to WOSAS (16th September 2025) – note that there is no
objection recommended on cultural heritage grounds, and that there is no specific
issue with the predicted cultural heritage impacts. There is a comment that there
may be too much focus of the assessment on individual heritage assets. This may
be how the assessment is set out, however any relevant relationships to ther
monuments/relevant historic landscapes, as far as it is possible to identify these,
would have been addressed as part of that. The comments are referring to a
broader, and perhaps more subjective appreciation of the historic environment.
As this remains quite vague, they are not sure there is much that can be offered
by way of a detailed response; other than to emphasise that wider landscape
relationships have been considered as part of the setting impact assessment. If
there is a specific monument or group of monuments that in the view of WOSAS
has not been suitably assessed the Applicant would be happy to respond
accordingly – noting that there is a large range of heritage assets/archaeological
sites which span a large period.  
13.10 West of Scotland Archaeology Service – were sent a copy of the Applicants
response to ascertain whether they had any further comments.  At time of writing
no further response has been received. 
13.11 Having due regard to the above subject to the conditions to address the
concerns of Historic Scotland (tree protection/planting and timeous
reinstatement of the temporary bellmouth) and any  conditions
recommended by  the West of Scotland Archaeology Service following
further consultation it is considered that the proposal is consistent with the
provisions of Policy 11 – Energy and Policy 7 – Historic Assets and Places
of NPF4, and Policies 30 – The Sustainable Growth of Renewables; 15 –
Protection, Conservation and Enhancement of Our Historic Environment;
19 – Scheduled Monuments; 20 – Gardens and Designed Landscapes; and
21 – Sites of Archaeological Importance of the LDP2  
14. HYDROLOGY, THE WATER ENVIRONMENT AND FLOOD RISK  
14.1 Policy 11 – Energy of NPF4 requires that project design and mitigation
demonstrate how effects on hydrology, the water environment and flood risk have
been addressed. Policy 30 – Supporting the Sustainable Growth of Renewables
of LDP2 requires all applications for wind turbine developments to be assessed
against impacts arising from effects on hydrology, the water environment and
flood risk (including cumulative). Policy 55 - Flooding of LDP2 provides guidance
on the type of development that will be permissible within specific flood risk areas.
Policy 57 – Risk Appraisals requires flood risk assessments, and drainage impact
assessments, to accompany applications where required.

Page 35

14.2 The Council’s Flood Prevention Officer – has advised that they have no objection
subject to conditions to ensure that watercourse crossings are designed so there
is no reduction in pre-development channel cross sectional area ideally to pass
the 1 in 200 years plus climate change flood event; and, surface water drainage
is designed in accordance with CIRIA C753 and ensures that post development
runoff is attenuated to the 1 in 2 year greenfield runoff rate. The surface water
drainage should be in operation prior to the start of construction.    
14.3 Having due regard to the above, subject to the conditions recommended by
the Flood Prevention Officer it is concluded that the proposal is consistent
with the provisions of Policy 11 – Energy of NPF 4, Policy 30 – The
Sustainable Growth of Renewables, Policy 55 – Flooding; and Policy 57 Risk
Appraisals of LDP2.    
15. BIODIVERSITY    
15.1 Policy 11 – Energy of NPF4 requires that project design and mitigation
demonstrate how impacts on biodiversity, including birds have been addressed.
Policy 1 – Tackling the climate and nature crises of NPF4 requires that when
considering all proposals significant weight will be given to the global climate and
nature crises. Policy 3 – Biodiversity of NPF4 requires proposals to protect
biodiversity, reverse biodiversity loss, deliver positive effects from development
and strengthen nature networks. Policy 5 – Soils of NPF4 supports the generation
of energy from renewable sources that optimises the contribution of the area to
GHG emissions reduction targets on peatland, carbon-rich soils, and priority
peatland. A detailed site-specific assessment will be required for development on
peatland which will include the net effects of the development on climate
emissions and loss of carbon. Policy 30 – The Sustainable Growth of Renewables
of LDP2 requires all applications for wind turbine developments to be assessed
against impacts arising from effects on the natural heritage, including birds and to
be assessed against impacts on carbon rich soils, using the carbon calculator
(including cumulative). Policy  73 – Development Impact on Habitats,
Species and Biodiversity requires proposals to incorporate, safeguard and
enhance existing site biodiversity wherever possible. 
15.2 NatureScot initially advised the ECU the proposal could affect internationally
important natural heritage interests, and they objected until further information
regarding the Kintyre Goose Roosts Special Protection Area was provided. This
would enable them to carry out an appraisal of these effects and help the ECU
determine the proposal. NatureScot also noted the presence of Leisler’s bats
within the footprint of the proposal and advised they would provide further advice
on this is due course.  
15.3 NatureScot provided advice to the ECU on bats at the site. 
Bats - The bat activity surveys indicate that there is at least a moderate level of
bat activity within the survey area with Nyctalus, Myotis and Pipistrellus species
being recorded. Of note is the occurrence of Leisler’s bat (Nyctalus leisleri), which
is considered a rare and high-risk species in Scotland. Kintyre is not currently
acknowledged to be within the Leisler’s bat established range; however, the bat
activity survey provides evidence of a wider distribution of this species in Scotland
than is currently known.

Page 36

15.4 Bat Mitigation - As the Applicant is proposing to keyhole turbines into the existing
forestry, this can increase the risk of bat fatalities due to the increase in forest
edge habitat close to the turbines and associated infrastructure. We would advise
that feathering is routinely applied to the turbine blades below cut-in speed during
operation. This measure can help reduce the risk of bat casualties by 50%. If
feathering is implemented, we would ask that monitoring is carried out for three
years post-construction to assess changes in bat activity. We note that the
Applicant was unable to have bat data analysed through EcoBat as it was
unavailable at the time. We believe it is now operational and would advise that
the Applicant has the data analysed, if possible, to provide an independent
assessment on the level of bat activity at the site.  
15.5 NatureScot have provided the ECU with a response to the additional information
provided by the Applicant, which they requested in their initial response. In
summary, they advise that there are natural heritage interests of international
importance on the site, but their advice is that these will not be adversely affected
by the proposal. They refer to their previous advice in relation to landscape and
visual impacts and ecological impacts.  
15.6 Kintyre Goose Roosts Special Protection Area - The Proposal is located approx.
540 m to the south-west of Loch an Fhraoich, a component loch of the Kintyre
Goose Roosts Special Protection Area (SPA), Ramsar Site, and the Kintyre
Goose Lochs Site of Special Scientific Interest (SSSI). Rhunahaorine Point SSSI
(also part of the Kintyre Goose Roosts SPA) is located approx. 1.7 km to the
north-west of the proposal. These sites are all designated for overwintering
populations of Greenland white-fronted geese (GWFG). 
15.7 The site’s status means that the requirements of the Conservation (Natural
Habitats, &c.) Regulations 1994 as amended (the ‘Habitats Regulations’) apply
or, for reserved matters, The Conservation of Habitats and Species Regulations
2017. Consequently, ECU is required to consider the effect of the proposal on the
SPA before it can be consented (commonly known as Habitats Regulations
Appraisal). 
15.8 NatureScot’s advice is that this proposal is likely to have a significant effect on
the GWFG feature of the SPA. Consequently, ECU, as competent authority, is
required to carry out an appropriate assessment in view of the site’s conservation
objectives for its qualifying interest. They advise that based on the information
provided, their conclusion is that the proposal will not adversely affect the integrity
of the site. 
15.9 RSPB Scotland – initially advised the ECU that they shared NatureScot's concern
regarding the assessment of collision risk for Greenland White-fronted Geese.
They would be pleased to provide further comment on this element once the
information requested by NS has been provided. Having considered the revised
collision risk model for Greenland White-fronted Goose they have advise the ECU
they have no further comments and do not object.  
15.10 Outline Biodiversity Enhancement and Management Plan (oBEMP) - RSPB
Scotland considers the oBEMP to be appropriate and welcomes the outline
proposals therein.

Page 37

15.11 Compensatory Planting - It is noted that infrastructure felling of 33.4 ha and
management felling of 7.9 ha will be required should the proposal be consented,
but it is presently unclear where the required Compensatory Planting (CP) is
proposed to be delivered. RSPB Scotland recommends that wherever possible in
an Argyll context, CP is delivered as low-density native shrub and broadleaf
woodland, and that planting on good quality open ground habitats is avoided.  
15.12 SEPA (Scottish Environment Protection Agency) have advised the ECU that a
planning condition in relation to Borrow Pit restoration should be attached to any
consent if granted. If this will not be applied, then SEPA object. 
15.13 Peat Management Plan - SEPA note the proposal to use a depth of 2m peat as
restoration of the borrow pits. As most of the borrow pits appear to lie on shallower
peat it is unlikely restoration of peat, tying into existing water tables will be
successful. SEPA also note the applicant proposes to use this infill of acrotelm
and catotelm peat as 'substrate for afforestation' on top of restored borrow pits.
Any form of tree planting on top of peat is likely to result in its desiccation; loss of
its carbon storing potential and cause it to no longer be peat. SEPA are of the
opinion this would therefore be viewed as peat and would require a waste
management license.  
15.14 SEPA therefore request a condition is attached to any consent for the submission
of detailed finalised plans for borrow pit management and restoration prior to
commencement of construction on site. In the meantime, they recommend the
applicant explores further re-uses of the excavated peat. SEPA recommend the
submission of a Finalised Peat management Plan is also conditioned.  
15.15 Groundwater Dependent Terrestrial Ecosystems (GWDTE) - SEPA have
reviewed Technical Appendix 7.1 and the Outline Biodiversity Action Plan and
confirm they have no detailed comments to make on these aspects of the
proposal. However, they recommend the applicant explores the possibility of the
use of peat, even if in small volumes, in conjunction with the proposed drain
blocking to improve existing bog habitat.   
Peat Landslide Hazard Risk Assessment    
15.16 Ironside Farrar, Peat Landslide Hazard Risk Assessment (PLHRA), Stage 1
Checking Report advised the ECU that no further response is required. The
PLHRA is satisfactory. The checking report has determined that the PLHRA is
sufficiently robust in all respects, although some recommendations may be made
for clarity, no further revisions are required.  
15.17 The Council’s Local Biodiversity Officer (LBO) – has provided the following advice
and recommendations. 
15.18 The Kintyre Goose Roosts SPA/Ramsar/SSSI – lies 540m north of the site
boundary and 2.2km from the closest wind turbine. Its Qualifying Feature is -
wintering population of Greenland white-fronted goose (Anser albifrons). The
Local Biodiversity Officer notes NatureScot’s response of the 28th of October 2023
where they: ‘Advise that the proposal is likely to have a significant effect on the
qualifying interests of the Kintyre Goose Roosts SPA and its associated SSSI, so
a Habitats Regulations assessment will be required. Effects on the geese could
include collision mortality, barrier effects, disturbance during construction and

Page 38

operation, and cumulative effects. The applicant has included a Habitats
Regulation Appraisal Report with an overall conclusion ‘the Proposed
Development would have no adverse effect on the integrity of the Kintyre Goose
Roosts SPA.’ The Local Biodiversity Officer agrees with the findings in this report
and the mitigation measures of no construction work for the access site taking
place to the west of the A83 during October to March to prevent disturbance
during feeding. The Local Biodiversity Officer welcomes the objectives within the
Biodiversity Enhancement Management Plan (BEMP) to include a long-term
enhanced monitoring programme and GPS-tagging to obtain more data. 
15.19 Predicted Habitat Losses and Impacts – has advised that none of the predicted
habitat losses (acid flush, blanket bog, wet modified bog, wet heath, marshy
grassland, and hedgerow) are likely to have a significant impact and there would
be no effects on other habitats of conservation value. The Local Biodiversity
Officer welcomes the habitat and peatland enhancement objectives within the
BEMP and the continued monitoring of habitat and peatland restoration
throughout the lifetime of the wind farm. They advise that the applicant should
include an appropriate plan for mitigation against potential deer impact on
newly planted trees until such a time that they are established and no longer
vulnerable to over-browsing.  
15.20 Peatland - One wind turbine will be located on blanket bog but on peat less than
1m depth. Design of the proposal has changed to avoid areas of deep peat as
much as possible and reduce habitat loss of blanket bog. Floating access tracks
will be adopted where the levels of peat exceed 1m in depth. The Local
Biodiversity Officer welcomes the objectives within the BEMP for peatland
enhancement and monitoring throughout the lifetime of the wind farm.   
Summary of European Protected Species  
15.21 Bats – Seven species of bats were identified in the surveys. The surveys did not
identify any area of high bat activity that would require buffering in the wind farm
design. No loss of potential bat roosts. No significant impact to bats with a low-
risk site for collision with wind turbines. The Local Biodiversity Officer welcomes
the avoidance of bat preferred habitat features with a minimum 50m buffer
maintained between wind turbine blade tips and the nearest woodland edge. The
Local Biodiversity Officer makes the following recommendation: While the
impact to bats is unlikely to be significant, it would be advisable to monitor
any fatalities that may occur from collision as they are found to forage
within the wind turbine areas.  
15.22 Otter – Evidence of otter was recorded along many of the watercourses and along
several of the waterbodies within the site. The Local Biodiversity Officer welcomes
the inclusion of a Species Protection Pan (SPP) to include pre-construction
surveys undertaken within one month of the commencement of works, to inform
the need for any mitigation measures to ensure significant effects on the species
are avoided. 
Summary of Protected Species    
15.23 Badger - No records found within the potential impact zone (30m). A sett was
located 50m from the proposed access track across the Killean Burn. Water Vole,

Page 39

Red Squirrel, Pine Marten, and Reptiles - No evidence recorded. Suitable habitat
is present  
15.24 Fish - Species likely present are brown trout and European eel. Some suitable
habitat present. Watercourses will be buffered by 50m apart from locations where
access tracks unavoidably need to cross. The Local Biodiversity Officer welcomes
the inclusion of the Species Protection Plan (SPP) and appointment of an
Ecological Clerk of Works (ECoW) to implement the SPP to include provision of
a Toolbox Talk to all construction staff and contractors and to conduct pre-
construction surveys of protected species of within a month of works starting and
implement appropriate mitigation measures where necessary. 
15.25 Summary of Ornithology – 58 species recorded in the Breeding Bird Surveys with
an additional 15 non-breeding bird species. 45 species recorded in the Wintering
Bird Populations. Species recorded are a mix of raptors, wild fowl, passerines,
and grassland birds. Black grouse lekking sites were recorded on site. Red
throated divers recorded breeding within 2km of the site. No significant impact of
residual impacts on any bird species. Proposal would not affect the favourable
conservation status of any bird species of conservation importance. No adverse
effect on the integrity of any SPA qualifying interests  
15.26 The Local Biodiversity Officer welcomes the removal of the two northernmost
wind turbines to avoid the main goose flight corridor as well as location of the wind
turbines and associated infrastructure to avoid protected sites and species
including the Kintyre Goose Roost SPA, golden eagles, and hen harriers. It is also
noted that there will be a 500m buffer between wind turbines and used black
grouse leks and no construction work will take place before 09:00 within 750m of
any lek sites during April and May.  
15.27 The Local Biodiversity Officer welcomes the creation of 10ha low-density native
woodland edges to improve connectivity and black grouse habitat as outlined in
the BEMP. They also welcome the provision of three artificial nest rafts for red-
throated divers and long-term monitoring to include breeding bird surveys (BBS),
vantage point (VP) surveys, and winter geese surveys. 
15.28 Recommendation – as with the habitat and peatland enhancement, the
application needs to include a plan for mitigation against potential deer
impact on newly planted trees until such a time that they are established
and no longer vulnerable to over-browsing.  
15.29 Biodiversity Enhancement Management Plan (BEMP) - the Local Biodiversity
Officer welcomes the following objectives within the plan: habitat and peatland
enhancement including black grouse, red-throated diver, greenland white-fronted
goose, long term monitoring of planned objectives, reporting of monitoring results
to relevant parties and implementation of a Biodiversity Enhancement
Management Group.  
15.30 Construction Environmental Management Plan (CEMP) - the Local Biodiversity
Officer welcomes the inclusion of the plan to include implementation of an EcoW,
provision of Toolbox talks to all construction staff and contractors, conduction of
pre-construction works within one month prior to works starting, and
implementation of appropriate mitigation measures where necessary. The Local

Page 40

Biodiversity Officer welcomes the appointment of an ECoW prior to construction
and throughout works where necessary.  
15.31 Argyll District Salmon Fishery Board (ADSFB) – advised the ECU they are
satisfied the proposal should not have any significant impact on migratory
salmonid fish habitat within the site providing the construction phase is conducted
in accordance with current environmental regulations. Migratory salmonid fish
(sea trout) are present in the lower reaches of the Killean Burn, Tayinloan Burn,
Clachaig Water and Carradale Water (which also has Atlantic salmon) which may
be affected by any deterioration in water quality caused during construction.
ADSFB urge that in the event the proposal receives consent that monitoring of
Water quality, macroinvertebrates, and fish should be undertaken to Scottish
Government guidelines. It is recommended that the matters raised by ADSFB in
relation to the construction phase and monitoring are secured by condition.  
15.32 Having due regard to the above, subject to the recommendations made by
NatureScot, SEPA, RSPB Scotland, the Argyll District Salmon Fishery
Board and the Local Biodiversity Officer being secured by condition in the
event that consent is granted it is considered that the proposal is consistent
with the provisions of Policies 11 – Energy, 3 Biodiversity, 5 – Soils and
Policies 30 – The Sustainable Growth of Renewables of and 79 – Protection
of Soil and Peat Resources of LDP2  
16. TREES, WOODS, AND FORESTS  
16.1 Policy 11 – Energy of NPF4 requires that project design and mitigation will
demonstrate how impacts on trees, woods and forests have been addressed.
Policy 6 – Forestry, woodland, and Trees of NPF4 intent is to protect and expand
forests, woodland, and trees. Policy 77 – Forestry, Woodland, and Trees of LDP2
states that there is a strong presumption in favour of protecting woodland
resources. Policy 78 – Woodland Removal of LDP2 states that proposals that
involve the removal of woodland resources will be assessed against the criteria
for determining the acceptability of woodland removal, in accordance with the
Scottish Government’s Control of Woodland Removal Policy. Where this
assessment concludes that compensatory planting would be appropriate,
developers will need to provide for this in accordance with the advice in the
Scottish Government’s Control of Woodland Removal Policy.  
16.2 Scottish Forestry have advised the ECU that compensatory planting should be
secured by a condition. Furthermore, that the appropriate consenting route for the
management felling required to accommodate construction of the development,
including infrastructure and management felling, totalling 41.3ha would be the
Section 36 consent. Restocking of management felling areas and compensatory
planting relating to permanent woodland loss would also be via the Section 36
consent. 
16.3 Having due regard to the above subject to the condition recommended by
Scottish Forestry being attached in the event that the proposal receives
consent it is consistent with the provisions of Policies 11 – Energy and 6 –
Forestry, woodland and Trees of NPF4, and Policies 30 – The Sustainable
Growth of Renewables; 77 – Forestry, Woodland and Trees and 78 –
Woodland Removal of the LDP2

Page 41

17. MINERALS  
17.1 Policy 33 – Minerals of NPF4 states that proposals for borrow pits will only be
supported where the proposal is tied to a specific project and is time-limited, the
proposal complies with the mineral extraction criteria in Policy 33 taking into
account the temporary nature of the development, and appropriate restoration
proposals are enforceable and Policy 31 – Minerals of LDP2 states that proposals
for mineral extraction will generally be supported for borrow pits where the
proposal is found to be acceptable after being assessed against NPF4 Policy 33
criterion e).  
17.2 Borrow pits may be used to provide the stone for the construction of access
tracks, compounds, and hardstands, subject to sufficient quality and quantity of
stone being available at the six borrow pit search areas. These search areas are
shown as the maximum potential area of borrow pit extraction, but it is not
anticipated these areas would be fully exploited. Final borrow pit locations within
the borrow pit search areas would be subject to detailed ground investigations to
confirm suitability of material. A condition is recommended to secure details of the
borrow pits and a borrow pit restoration plan.  
17.3 Having due regard to the above taking into account that the proposed
borrow pits are tied to the proposal and subject to a condition to secure
details of the borrow pits and a borrow pit restoration plan being attached
to any consent it is concluded that the proposal is consistent with the
provisions of Policy 33 – Minerals of NPF4 and Policy 31 – Minerals of LDP2
in this regard, subject to a condition to secure details of the borrow pit and
a borrow pit restoration plan.  
18. DECOMMISSIONING, SITE RESTORATION AND QUALITY OF SITE
RESTORATION PLANS    
18.1 Policy 11 – Energy of NPF4 requires that project design and mitigation
demonstrate how the decommissioning of developments, including ancillary
infrastructure, and site restoration have been addressed. It also requires that
project design and mitigation demonstrate how the quality of site restoration plans
have been addressed including the measures in place to safeguard or guarantee
availability of finances to effectively implement those plans. Policy 30 – The
Sustainable Growth of Renewables of the LDP2 requires consideration to be
given to the long-term environmental management of the site. 
18.2 The proposal is expected to operate for up to 50 years following which
decommissioning of the wind turbines and other infrastructure would be
undertaken as required. Any alternative to this action would be subject to a further
consenting process.  
18.3 In the event of decommissioning, or replacement of the wind turbines, it is
anticipated that the likelihood of environmental effects is like, or less than, that
expected during construction. Decommissioning would be undertaken in line with
best practice processes and methods and will be managed through an agreed
CEMP. Decommissioning will involve the following: dismantling and removal of
wind turbines and electrical equipment; restoration of the wind turbine areas,
hardstands, and access tracks; and dismantling and removal of the substation
compound. The CEMP will be updated as required to ensure best practice is

Page 42

adopted during decommissioning. It is recommended that this matter is covered
by planning conditions consistent with other projects across Argyll & Bute if the
proposal obtains consent from the ECU. 
18.4 Having due regard to the above it is concluded that subject to an
appropriate condition being attached if the proposal receives consent the
proposal is consistent with the provisions of Policy 11 – Energy of NPF4
and Policy 30 - The Sustainable Growth of Renewables of the LDP2  
19. CUMULATIVE IMPACTS  
19.1 Policy 11 – Energy of NPF4 requires that project design and mitigation will
demonstrate how cumulative impacts have been addressed. Policy 30 – The
Sustainable Growth of Renewables of the LDP2 also requires cumulative impacts
to be addressed. Any cumulative impacts which have been identified are covered
in the preceding sections of this report.  
20. RENEWABLE ENERGY GENERATION TARGETS AND GREENHOUSE GAS
EMISSIONS REDUCTION TARGETS. 
20.1 Policy 11 – Energy of NPF4 requires that, in considering the impacts of the
proposal, significant weight will be placed on the contribution of the proposal to
renewable energy generation targets and on greenhouse gas emissions reduction
targets. Policy 1 – Tackling the climate and nature crises of NPF4 requires that
when considering proposals significant weight will be given to the global climate
and nature crises. Policy 30 – The Sustainable Growth of Renewables of LDP2
requires all renewable developments to be assessed against the scale of
contribution to renewable energy generation targets and greenhouse gas
emissions. 
20.2 Renewable Electricity Generation - Both UK and Scottish Government energy
policy recognises the need for substantial increases in renewable energy
generation if the transition towards net zero is to be achieved. The turbines would
have an anticipated capacity of approx. 6.6MW. The annual generation from the
turbines is therefore estimated at approx. 227.8 Gigawatt hours (GWh) based on
a site derived capacity factor of 43.77% 1. The turbines will therefore supply
renewable electricity equivalent to the approximate annual domestic needs of up
to 70,3162 average UK households. Each unit of renewable electricity transmitted
will displace a unit of conventionally generated electricity, therefore displacing
carbon dioxide (CO2) emissions. It is estimated that the proposed wind turbines
will displace approx. 96,5873 tonnes of CO2 emissions per year, or 4,829,360
tonnes over the anticipated 50-year lifespan of the proposal.  
20.4 Greenhouse Gas Emissions – The proposal would reduce greenhouse gas
emissions through replacing fossil fuel generation. The length of time a wind
turbine needs to be in operation before it has, by displacing fossil fuel energy
generation, avoided as much carbon dioxide as was released in its lifecycle is
known as the carbon payback period. A carbon balance assessment has been
undertaken using the Scottish Government’s carbon calculator. The results reveal
the net impact will be positive overall, as the calculations of total carbon dioxide
emission savings and payback time indicate the overall payback period would be
approx. 1.5 years, when compared to the fossil fuel mix of electricity generation.
Over the expected 48.5 years the proposal is likely to be generating carbon-free

Page 43

electricity, this could result in around 4,829,360 tonnes of net carbon dioxide
emission savings when replacing fossil fuel-mix electricity generation. Overall, the
proposal would lead to substantial net carbon savings and reduction of
greenhouse gas emissions over its operational life. Peatland is an important
carbon store, and the proposal has potential to impact peat, despite mitigations
proposed to limit disturbance. A carbon balance assessment report has been
produced and Scottish Government’s online carbon calculator tool completed to
determine the carbon payback time for the proposal. The results from the carbon
calculator reveal that the net impact of the proposal will be positive overall, as the
calculations of total carbon dioxide emission savings and payback time for the
proposal indicates the overall payback period would be approximately 1.5 years,
when compared to the fossil fuel mix of electricity generation. This means that the
proposal is expected to take between 0.6 and 1.9 years to repay the carbon
exchange to the atmosphere (the CO2 debt) through construction of the wind
turbines; the proposal would in effect be in a net gain situation following this time
period and would contribute to national CO2 reduction targets. The proposal
therefore illustrates a significantly positive net impact in terms of its contribution
towards the reduction of greenhouse gas emissions from energy production.  
20.5 Having due regard to the above it is considered that the proposal is
consistent with the provisions of Policies 1 – Tackling the climate and
nature crisis and 11 – Energy of NPF 4, and Policies 30 – The Sustainable
Growth of Renewables and 04 – Sustainable Development of LDP2 in
respect to renewable energy generation targets and greenhouse gas
emissions reduction targets.    
21. GRID CAPACITY & ENERGY STORAGE    
21.1 Policy 11 – Energy of NPF4 requires that grid capacity should not constrain
renewable energy development. It is for developers to agree connections to the
grid with the relevant network operator. Furthermore, that proposals for all forms
of renewable, low-carbon and zero emissions technologies will be supported,
which include energy storage. Policy 30 – The Sustainable Growth of Renewables
of LDP2 requires the Council to have regard to the opportunities for energy
storage. 
21.2 Grid Capacity - Connection to Electricity Grid - The proposed point of connection
into the electricity grid system is at the substation compound. The proposal would
be connected at Carradale Substation, a substation located approx. 11.2km
southeast of the site. The connection would be comprised of buried 132kV cables
and/or Overhead lines (OHL). The exact arrangement of this grid connection is
subject to detailed design by SSEN Transmission. Any final grid connection route
and associated consents would be subject to a separate consenting process and
EIA if required.  
21.3 Energy storage – This project will not have a Battery Energy Storage System
(BESS). The reason there is no BESS proposed at Killean is simply down to the
terms of the Applicant’s option agreement with the landowner. It was signed
around the time of the original application, before BESS became more commonly
included in wind applications, so they currently have rights for a wind farm only.
Not to say that this could not be amended and incorporated in future.

Page 44

21.4 Having due regard to the above it is considered that the proposal is
consistent with the provisions of Policy 11 – Energy of NPF 4, and Policy 30
– The Sustainable Growth of Renewables of the ABLDP2 in respect to Grid
Capacity and Energy Storage.  
22. PERPETUITY    
22.1 Policy 11 – Energy of NPF4 requires that consents for proposals may be time
limited. Areas identified for wind farms are, however, expected to be suitable for
use in perpetuity. It is acknowledged that areas identified for wind farms are
expected to be suitable for use in perpetuity. However, as the expected
operational life of the proposal is 50 years from the date of commissioning, should
consent be granted, Officers would expect it to be time limited to 50 years to
reflect the life of the wind farm as detailed in the EIAR.  
23. CONCLUSION   
23.1 This proposal is classed as “Strategic Renewable Electricity Generation” - a
National Development, in terms of the Spatial Strategy given its capacity to
generate and store more than 50MW. In principle, there is support for this scale
of development given its importance in the delivery of Scotland’s Spatial Strategy.
However, such projects are still required to be assessed against the provisions of
the Development Plan, which consists of NPF4 and LDP 2.  
23.2 The lead Development Plan policies support renewable energy development in
principle but require proposals to be assessed against the criterion detailed in this
report. While the weight to be given to each of the considerations is a matter for
the decision maker, NPF4 is clear that significant weight will require to be placed
on the contribution of the proposal to renewable energy generation targets and
on greenhouse gas emission reduction targets. However, a balance still requires
to be reached in terms of the impact of the development. 
23.3 In relation to landscape and visual impacts NPF4 advises that where impacts are
localised and/or appropriate design mitigation has been applied such effects will
be considered acceptable. However, NPF4 must be read as a whole, and detailed
consideration given to linked policies. Policy 4 (Natural Places) – sets out that
proposals which by virtue of type, location or scale will have an unacceptable
impact on the natural environment will not be supported. Whilst it is considered
that this proposal will have a significant landscape and visual impact, it is not
considered that it warrants an objection subject to the conditions recommended
by the Councils Consultant Landscape Architect. 
23.4 The Scottish Government gives considerable commitment to renewable energy
and encourages Planning Authorities to support the development of wind farms
where they can operate successfully in appropriate locations. This is not however
blanket support without qualification. In considering the appropriateness of the
development, significant weight has been given to these matters. 
23.5 In conclusion, it is recommended by Officers that the Council objects to this
proposal until such time as National Air Traffic Services remove their objection.
Thereafter, the Council would have no objection to this proposal subject to the
recommended conditions being included in any consent granted by Scottish
Ministers.

Page 45

24. RECOMMENDATION  
24.1 That the ECU be notified accordingly that: 
(1) There is an unresolved objection from National Air Traffic Services
Safeguarding (NATS). Consequently, Argyll & Bute Council OBJECT on the
grounds that the proposal will have an adverse Aviation Impact, contrary to
the provisions of Policy 11 – Energy of NPF4 which requires that project design
and mitigation demonstrates how impacts on aviation and defence interests
including seismological recording have been addressed, Policy 30 – the
Sustainable Growth of Renewables of LDP2 which requires impacts on aviation
and defence interests and seismological recording to be addressed, and Policy
43 – Safeguarding of Aerodromes of LDP2 which stipulates that development will
not be permitted where it would compromise the safe operation of an Aerodrome
or Technical Site or constrain their present or future operations. 
Note: If NATS withdraw their objection and subject to any conditions they
recommend being attached to any grant of consent Argyll & Bute Council
would no longer object on these grounds. Should the objection remain
unresolved, and the proposal progresses to Public Inquiry, Argyll & Bute
Council would defer to NATS. 
(2) Argyll & Bute Council has no objection in respect to landscape and visual
impact subject to conditions to secure the mitigation recommended by the Council’s
Consultant Landscape Architect being attached to any grant of consent: 
• Aircraft Detection Lighting System 
• Substantial increases in broadleaved planting as part of the wind farm restocking
plan including riparian planting across the wider Killean estate. 
• Redesign of the outer margins of productive woodland to remedy hard angular
edges and improve the fit of plantations with landform. 
• Compensatory planting should be undertaken within the Killean Estate. Argyll &
Bute Council and Scottish Forestry should be consulted on the location, extent,
and composition. 
• Management of existing mature mixed woodlands in the vicinity of Killean House
including new planting to retain and enhance screening of the proposed wind farm
from the coast and protect the landscape setting provided to the Killean Estate
buildings and St John’s Church. 
(3) Argyll & Bute Council has no objection in respect to archaeological impact,
subject to conditions to secure appropriate archaeological mitigation being attached
to any grant of consent following further consultation with the West of Scotland
Archaeology Service. 
(4) Argyll & Bute Council has no objection in respect to Biodiversity Impact,
subject to conditions to secure the recommendations of the Local Biodiversity Officer
being attached to any grant of consent.

Page 46

• An appropriate plan for mitigation against potential deer impact on newly planted
trees until such time as they are established and no longer vulnerable to over-
browsing.
• While the impact to bats is unlikely to be significant, it would be advisable to
monitor any fatalities that may occur from collision as they are found to forage
within the wind turbine areas. 
(5) Argyll & Bute Council has no objection in respect to noise impact, subject to a
suitably worded conditions to limit the noise levels, tonality, and amplitude modulation
to control noise levels from the proposal and provide appropriate noise mitigation as
recommended and agreed by the Councils Noise Consultant. 
(6) Argyll & Bute has no objection in respect to flood risk subject to conditions to
secure the recommendations of the Flood Risk Assessor being attached to any
grant of consent: 
• To ensure watercourse crossings are designed so there is no reduction in pre-
development channel cross sectional area ideally to pass the 1 in 200 year
plus climate change flood event; and,
• Surface water drainage is designed in accordance with CIRIA C753 and
ensures that post development runoff is attenuated to the 1 in 2 year
greenfield runoff rate. The surface water drainage should be in operation prior
to the start of construction. 
(7) Argyll & Bute Council has no objection in respect to Access subject to the
condition to secure the recommendations of the Access Officer being attached to
any grant of consent: 
• Access Plan to be submitted and agreed in writing by the Council prior to the
commencement of development. 
(8) Argyll & Bute Council has no objection in respect to provision of the turning
area across from the site access subject to the following conditions being
attached to any grant of consent. 
• Exact details and specifications of the design of the turning area to be submitted
for the written approval of the Planning Authority prior to commencement of
development.
• Exact details and specification of the restoration plan for the turning area to be
submitted for the written approval of the Planning Authority prior to
commencement of development. These shall include details of timescales and
landscaping.
• A condition to limit the turning area to an appropriate temporary period to be
agreed in writing by the Planning Authority. 
(9) Argyll & Bute Council requests that all conditions recommended by other