Page 1

Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD
28 February 2023 
NOTICE OF MEETING 
A meeting of the BUTE AND COWAL AREA COMMITTEE will be held ON A HYBRID BASIS IN
THE QUEEN'S HALL, DUNOON AND BY MICROSOFT TEAM on TUESDAY, 7 MARCH 2023 at
10:00 AM, which you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. MINUTES 
(a) Bute and Cowal Area Committee - 6 December 2022 (Pages 3 - 12)  
(b) Bute and Cowal Area Community Planning Group - 7 February 2023
(Pages 13 - 22)  
(c) Cowal Transport Forum - 14 February 2023 (Pages 23 - 30) 
4. PUBLIC QUESTION TIME 
5. PUPIL VOICE 
Verbal Presentation by Pupil Representatives from Dunoon Grammar School and
Rothesay Joint Campus 
6. AREA PERFORMANCE REPORT - FQ3 2022/23 (Pages 31 - 66)  
Report by Executive Director with responsibility for Customer Support Services 
7. POLICE SCOTLAND ROADS UPDATE 
Verbal Update from PS Eddie McGunnigal, Police Scotland 
8. ROADS AND INFRASTRUCTURE SERVICES UPDATE (Pages 67 - 70)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
Public Document Pack

Page 2

9. HOUSING SERVICES ACTIVITY UPDATE - STRATEGIC HOUSING INVESTMENT
PLAN (SHIP) - ANNUAL UPDATE (Pages 71 - 82)  
Report by Executive Director with responsibility for Development and Economic
Growth 
REPORTS FOR NOTING 
10. DRAFT BUTE AND COWAL AREA COMMITTEE WORKPLAN (Pages 83 - 86) 
REPORT WITH EXEMPT APPENDICES FOR DECISION 
11. LAMONT BEQUEST AWARD RECOMMENDATIONS 
(a) Report by Executive Director with responsibilities for Legal and Regulatory
Support (Pages 87 - 88) 
The Council will be asked to pass a resolution in terms of Section 50(A)(4) of the Local
Government (Scotland) Act 1973 to exclude the public for items of business with an “E” on the
grounds that it is likely to involve the disclosure of exempt information as defined in the
appropriate paragraph of Part I of Schedule 7a to the Local Government (Scotland) Act 1973. 
The appropriate paragraph is:- 
E1  Paragraph 6 Information relating to the financial or business affairs of any particular person
(other than the authority). 
E1  (b) Appendix 1 (Pages 89 - 90)
E1  (c) Appendix 2 (Pages 91 - 92) 
Bute and Cowal Area Committee 
Councillor Gordon Blair Councillor Audrey Forrest
Councillor Daniel Hampsey Councillor Reeni Kennedy-Boyle
Councillor Liz McCabe (Chair) Councillor Yvonne McNeilly (Vice-Chair)
Councillor Ross Moreland Councillor William Sinclair
Councillor Peter Wallace 
Contact: Julieann Small, Senior Committee Assistant - 01546 604043

Page 3

MINUTES of MEETING of BUTE AND COWAL AREA COMMITTEE held ON A HYBRID BASIS IN
THE QUEEN'S HALL, DUNOON AND BY MICROSOFT TEAMS 
on TUESDAY, 6 DECEMBER 2022 
Present: Councillor Liz McCabe (Chair) 
Councillor Gordon Blair
Councillor Daniel Hampsey
Councillor Reeni Kennedy-Boyle
Councillor Yvonne McNeilly 
Councillor Ross Moreland
Councillor William Sinclair
Councillor Peter Wallace 
Attending: Stuart McLean, Committee Manager 
Mark Calder, Project Manager
Stuart Green, Corporate Support Manager
Douglas Whyte, Housing Strategy Team Lead
Claire Hallybone, Dunoon CARS Project Officer
Michelle Mundie, Chief Executive, Argyll Housing Community Housing
Association (ACHA) 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillor Audrey Forrest. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. MINUTES 
(a) Bute and Cowal Area Committee - 6 September 2022 
The Minutes of the meeting of the Bute and Cowal Area Committee, held on 6
September 2022 were approved as a correct record. 
(b) Bute and Cowal Area Community Planning Group - 1 November 2022 
The Minutes of the meeting of the Bute and Cowal Area Community Planning
Group, held on 1 November 2022 were noted. 
(c) Cowal Transport Forum - 15 November 2022 
The Minutes of the meeting of the Cowal Transport Forum, held on 15 November
2022 were noted. 
4. PUBLIC QUESTION TIME 
Question from Liz Neilson, Sandbank Resident 
Liz Neilson highlighted that the Community were concerned with traffic speeding through
Sandbank and the general lack of road safety measures along the entirety of the road.
Public Document PackPage 3 Agenda Item 3a

Page 4

She added that within the last 6 months there had been a number of accidents with 2
fatalities being recorded. Mrs Neilson advised that the Community would like the Council
to consider a number of suggestions to mitigate against speeding, the principal suggestion
being a reduction of the speed limit to 20mph from Sandbank to Sandhaven.  
Response from Committee/Project Manager 
Councillor Sinclair highlighted that a speed survey had been requested for the section of
road mentioned and advised that he had also spoken to 2 senior officers who are aware of
the situation. 
The Project Manager referred to the general purposes roads and infrastructure update
provided in the agenda pack and highlighted the outstanding speed surveys, with the
Sandbank to Cothouse survey being first on that list. He advised that local authorities
have been allocated funding from the Scottish Government to undertake reviews of the
road network which would allow an assessment of whether 30mph roads would remain as
such or be reduced to 20mph. 
Decision 
The Bute and Cowal Area Committee agreed to invite Police Scotland to a future meeting
to discuss road safety measures within the locality. 
Questions by Jim Osborne, Bute Community Councillor 
Question 1 
Jim Osborne enquired about the Traffic Speed Survey’s which are to be carried out on
Kilchattan Bay and Crichton Road, Rothesay and asked the Project Manager if these are
separate from the previously mentioned 20mph speed reviews and when these would be
undertaken. 
Response from Project Manager 
The Project Manager advised that the speed surveys are in addition to the 20mph national
speed reviews and that there is a section in the general purposes roads and infrastructure
update that provides information on the speed surveys which would be worked through in
that order. 
Question 2
Jim Osborne asked about the review of Ardencraig Gardens which was to take place
following the summer season, specifically the quality of plants. He asked the Project
Manager if it had taken place and if so what the outcome was, he also enquired about who
the Council’s horticultural experts were.
Response from Project Manager/Committee
The Project Manager confirmed that the Council employ a team of gardeners across the
council area and that there are two based in Rothesay. The Project Manager confirmed
that the Department would soon begin exploring options for the supply of bedding plants
for 2023.
Page 4

Page 5

Question 3
Mr Osbourne asked why the Chair of the Bute and Cowal Area Committee never attends
Bute Community Council meetings?
Response from Councillor McCabe
Councillor Mcneilly responded that this was an inappropriate question as there could be a
host of private reasons as to why any elected member could not attend certain meetings
and that members do face demands on their time. 
The Chair advised that there are two other local councillors who routinely attend these
meetings and are more than capable of giving council updates.
Question 4
Jim Osborne enquired about the target of 73 in the performance measure for "street
cleaning" referenced within the Area Performance Report and asked what the number
meant?
Response by Project Manager
The Project Manager advised that the measurement was 73 was out of 100, and that the
figure was reached by applying the Local Environment Audit Management System, a
process used by all Scottish Local Authorities to compare and benchmark street
cleanliness levels and performance.
Question 5
Jim Osborne asked why there is a target of 0 for social housing new builds in Bute &
Cowal?
Response by Housing Strategy Team Lead
The Committee Manager advised that he had received a response from the Housing
Strategy Team Lead as follows: 
I can’t see where in the report it says there is a target of 0. 
In terms of a couple of positive comments there are currently 4 new build houses under
construction by ACHA in central Dunoon due for completion next year. We are actively
looking for opportunities to build new build affordable houses in the Dunoon area. 
Also in the overall Strategic Housing Investment Programme we have 40 units in there for
Bute – all Fyne Homes. 10 at Ballochgoy – not on site yet but estimated completion in
financial year 2023/24 and 30 at the Rothesay Academy site – not on site but preparatory
work is ongoing and once the building starts there is an estimated completion date of
2024/25 for phase 1. There is scope for further units to be delivered on this site in the
future.
Question 6
Page 5

Page 6

Jim Osborne enquired what is being done to address the causes of stress related absence
amongst non-teaching staff in schools and what staff does the LGE category include?
Response by HROD Manager 
The Committee Manager advised that he had received a response from the HROD
Manager as follows: 
LGE grouping of employees includes employees who are covered by the SJC negotiating
committee terms and conditions of service. In practical terms that includes all employees
who are not covered by teaching or chief officers conditions of service. The figures
reported will therefore include Local Government Employees from all services across the
council, and not only Education. 
With regards to the actions around the causes of stress related absence, I will respond in
general terms outlining what the council offer by way of identifying and managing stress in
the workforce. Since the question was specifically related to non-teaching LGE staff in
schools, the Education management team may be best placed to respond with any
additional measures relating to this specific group of employees. 
The causes of stress related absence in this category are varied and would include for
example where an employee is signed off by their GP after a life event such as a
bereavement. This category also includes other mental health matters such as
depression, anxiety etc. 
The council have a wellbeing strategy which aims to support our employees with their
physical, mental and financial wellbeing. 
With a specific focus on stress we have the following tools and resources which support
employees and their line managers to identify and address causes of stress, and support
employees who are feeling stressed: 
 Reducing stress in the workplace procedures
 Stress risk assessment tool
 Wellness action plans and other personal resilience tools
 Employee Assistance Programme including free confidential counselling
 Conflict resolution toolkit
 Trained mental health first aiders
 E-learning modules and taught training courses which cover topics such as
recognising the signs and symptoms and managing stress
 Our intranet also has links to a variety of external toolkits such as the Health and
Safety Executive’s talking toolkits 
Question 7 
Mr Osbourne asked why the Bute Resilience Team was not being funded by Argyll and
Bute Council? 
Response from Committee Manager/Committee
The Committee Manager said that he was unaware if Bute Resilience Team had tried to
access any of the funding streams such as the Supporting Communities Fund (SCF)
Page 6

Page 7

which provides grants of up to £2,500 for the voluntary sector, community councils and
parent councils. 
Mr McLean added that while it is not ‘Council money’ the Bute Resilience Team had
applied to the Rothesay Common Good fund and had subsequently been awarded £900
in April 2020.  
The Committee Manager highlighted that there is a Council hosted Grants and Funding
webpage which is designed to help groups find their way through the funding maze
and shows where Groups can get help to develop their project, information on sources of
funding with links to sites that gives tips on funding and free software. The Committee
Manager highlighted that he would be delighted to pass the link to Mr Osborne.
The Chair highlighted that the Council had previously provided the Bute Resilience Team
with a shop to work from for many months and added that she was aware of The Bute
Resilience team applying, successfully, for funds.
Questions by Roland Zielinski, Hunters Quay Community Council
Question 1
Roland Zielinski enquired about road signage for queuing traffic at Western Ferries,
Hunters Quay, which was to be erected and asked if the Committee could provide an
update.
Response from Committee/Committee Manager
Councillor Sinclair advised that he had raised this issue at the Cowal Transport Forum in
relation to LED signage at Rankins Brae to give traffic the opportunity to travel via the top
road and that discussions were ongoing with Western Ferries.
Councillor Hampsey advised that he would be happy to take this issue forward as Chair of
the Cowal Transport Forum.
The Committee Manager advised that the Environmental, Development and Infrastructure
Committee during its meeting of 1 December considered a report following the allocation
of £100k for a bin and signage programme.
Question 2
Mr Zielinski asked why there are no white lines along Marine Parade and throughout the
Hunters Quay area and those that are, are worn and not visible?.  Mr Zielinski added that
many double yellow lines are not visible which has created increased instances of illegal
parking as parking restrictions are unenforceable. 
Response from Committee
The Chair advised that the Council had employed 3 external service providers to
undertake white lining work and that she expects the work to be concluded within the next
2 weeks. The Chair confirmed that she would confirm with the Department that the double
yellow lines will also be reinstated.
Page 7

Page 8

Question 3
Mr Zielinski asked why a consultation is being undertaken regarding terminal infrastructure
at Dunoon when local opposition on a passenger only service has been clear?
Response from Project Manager
The Project Manager advised that the purpose of the consultation is to get feedback to
ensure safe and reliable berthing facilities.
Question 4
Mr Zielinski advised that construction work at Hunters Quay Holiday Park had to stop
recently due to the release of hydrogen sulphur gas which caused an explosion. Mr
Zielinski asked whether the relevant environmental agencies had been made aware and
whether there had been an investigation? 
Response from the Committee Manager 
The Committee Manager advised that he would take this issue to the relevant Department
and respond to Mr Zielinski and the Area Committee in due course.
Questions by David Clough, Dunoon Resident
Question 1 
David Clough highlighted discussions held at the recent meeting of the Cowal Transport
Forum, specifically the reliability and punctuality figures presented by Calmac ferries. Mr
Clough advised that a recent Freedom of Information request to Transport Scotland
showed that the technical reliability of Calmac was over 99%. Mr Clough asked whether
Calmac are reporting cancellations against scheduled timetables, and should Calmac be
providing better, more accurate performance data? 
Response from Committee 
Councillor Hampsey responded that the way in which Calmac presented the performance
data was not acceptable and advised that he had raised this at the Cowal Transport
Forum. Councillor Hampsey agreed that Calmac should be providing reliability figures
based on all cancellations and added that he would be happy to pass Mr Clough’s
concerns to Calmac. 
Question 2 
In the same Freedom of information request that was provided by Transport Scotland Mr
Clough reported that he had been advised that there was a Scotrail ticket machine in
place in Dunoon. Mr Clough asked if any elected members knew of its location? 
Response from Committee 
The Committee advised that they were not aware of a Scotrail ticket machine in Dunoon
and suggested Mr Clough contact Scotrail. 
Page 8

Page 9

5. AREA PERFORMANCE REPORT - FQ2 2022/23 
The Committee considered the Area Performance Report for Financial Quarter 2 2022/23
(July to September 2022) which illustrated the agreed performance measures. 
Decision 
The Bute and Cowal Area Committee:- 
1. noted and considered the performance and supporting commentary as presented; 
2. noted that upon receipt of the Quarterly Performance Report the Area Committee
should contact either the Responsible Named Officer or Sonya Thomas with any
queries; and 
3. noted that work is ongoing and to respond to Sonya Thomas with requests or
comments regarding the layout and format of the Performance Report and Scorecard. 
(Reference: Report by Executive Director with responsibility for Customer Support
Services, dated 20 October 2022, submitted) 
6. PERFORMANCE EXCELLENCE PROJECT, COMMUNICATIONS UPDATE 
The Corporate Support Manager provided a short presentation on the Performance
Excellence project.  He outlined the findings of the Council’s Best Value Audit which took
place in 2020 and highlighted key points from the Best Value Improvement Action Plan. 
Mr Green advised that as a result of recommendations agreed by Council in September
2021, a new suite of Corporate Outcome Indicators will be reported on annually and that
other improvements to the system were underway.  He outlined the new hierarchy of
performance reporting and confirmed that the Pyramid system previously used for
performance reporting will be decommissioned by the end of this financial year. 
Decision 
The Bute and Cowal Area Committee agreed to note the contents of the presentation and
information provided. 
(Reference: Presentation by Corporate Support Manager, dated December 2022,
submitted) 
7. ROADS AND INFRASTRUCTURE SERVICES UPDATE 
The Committee gave consideration to a report which provided an update on the recent
activities of Roads and Infrastructure Services and highlighted works being undertaken
which were relevant to Bute and Cowal area. 
Discussion took place in respect of the consultation exercise that was ongoing regarding
the passenger-only vessels for the Dunoon to Gourock ferry service. 
Decision 
Page 9

Page 10

The Bute and Cowal Area Committee noted and considered the contents of the report. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services, dated November 2022, submitted) 
8. LOCAL HOUSING STRATEGY (LHS) 2022-27 - ANNUAL UPDATE 
Members gave consideration to a report which presented the Argyll and Bute Local
Housing Strategy (LHS) Annual Report for 2022.  It was noted that a further report with
area specific information would be provided to the Committee at their meeting in March
2023.   
Decision 
The Bute and Cowal Area Committee considered and noted the contents of the report. 
(Reference: Report by Executive Director with responsibility for Housing, dated 10
October 2022, submitted) 
9. ACHA ANNUAL UPDATE 
Consideration was given to a presentation by the Chief Executive of ACHA, which
provided an update on a number of areas including the investment programme for
2022/23; the Warm Homes Fund; the Business, Energy, Industrial Strategy (BEIS) Whole
House Retrofit Programme; the replacement of wet electric heating systems; the Exemplar
Estates initiative and a number of new build and refurbishment sites across the locality. 
Further information was provided in respect of Welfare Rights; the Rent Consultation for
2023/24; ACHA’s 10 10 10 initiative and ACHA’s Community Action Fund. 
Decision 
The Bute and Cowal Area Committee agreed to note the contents of the presentation and
the information provided. 
(Reference: Presentation by Chief Executive, Argyll Community Housing Association Ltd,
submitted) 
10. ARGYLL AND BUTE HSCP ANNUAL PERFORMANCE REPORT 2021 
Having noted that there was no officer in attendance to present this item, the Committee
gave consideration to a report which presented the Argyll and Bute HSCP Annual
Performance Report for 2021. 
Decision 
The Bute and Cowal Area Committee considered and noted the contents of the Annual
Performance Report for the Health and Social Care Partnership for the year 2021. 
(Reference: Report by Head of Strategic Planning, Performance and Technology, Health
and Social Care Partnership, dated November 2022, submitted) 
Page 10

Page 11

11. DUNOON CARS - RECOMMENDATION OF GRANT AWARD 
Consideration was given to a report which provided an update on the progress of the
Dunoon CARS project and sought the approval of a grant offer to the owners of 104-110
Argyll Street, Dunoon. 
Decision 
The Bute and Cowal Area Committee approved the grant offer of up to £236,000 to the 5
property owners of 104-110 Argyll Street, Dunoon. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth, submitted) 
12. CHARITABLE TRUSTS, BEQUESTS AND TRUST FUNDS 
The Committee gave consideration to a report providing information on proposals relating
to the ongoing management and proposed distribution arrangements for Charitable
Trusts, Bequests and Trust Funds for which the Bute and Cowal Area Committee are
Trustees. 
Decision 
The Bute and Cowal Area Committee:- 
1. noted the financial position of all the Charitable Trusts, Bequests and Trust Funds as
of August 2022; 
2. agreed that a moratorium be placed on awards being made from the Piano  Fund,
Dunoon; and 
3. agreed that the accumulated funds for distribution from the Tulloch Library, Dunoon be
awarded to Live Argyll in their totality and that a moratorium be placed on awards
being made from this fund thereafter. 
(Reference: Report by Executive Director with responsibility for Legal and Regulatory
Support, dated November 2022, submitted) 
13. DRAFT BUTE AND COWAL AREA COMMITTEE WORKPLAN 
The Bute and Cowal Area Committee workplan was before members for information. 
Decision 
The Bute and Cowal Committee noted the contents of the workplan. 
(Reference: Bute and Cowal Area Committee workplan, dated 6 December 2022) 
14. THE PROVOST'S FUND (BUTE) - AWARD RECOMMENDATIONS 
Page 11

Page 12

The Committee gave consideration to a report which gave Members information regarding
three applications that had been received requesting support from the Provost’s Fund
(Bute). 
Decision 
The Bute and Cowal Area Committee:- 
1. agreed to award £100 to each applicant; and 
2. agreed that a moratorium be placed on awards being made from the Provost’s Fund
(Bute). 
(Reference: Report by Executive Director with responsibility for Legal and Regulatory
Support, dated November 2022, submitted) 
15. THE THIRD MARQUIS OF BUTE'S SILVER WEDDING DOWRY FUND 
Members gave consideration to a report which gave information regarding an application
that had been received requesting support from the Marquis of Bute’s Silver Wedding
Dowry Fund. 
Decision 
The Bute and Cowal Area Committee agreed to grant £500 to the applicant. 
(Reference: Report by Executive Director with responsibility for Legal and Regulatory
Support, dated November 2022, submitted) 
Page 12

Page 13

MINUTES of MEETING of the BUTE AND COWAL COMMUNITY PLANNING GROUP held 
BY MICROSOFT TEAMS
on TUESDAY, 7 FEBRUARY 2023 
Present: Charles Dixon-Spain (Chair)
Stuart McLean, Committee Manager, Argyll and Bute Council
Ailie Law, Community Development Officer, Argyll and Bute Council
Jackie Westerman, Home Energy Efficiency Project Officer, Argyll and Bute Council
John McLuckie, Community Planning Partnership Lead, Argyll and Bute Council
Councillor Liz McCabe
Councillor Daniel Hampsey
Councillor Gordon Blair
Councillor Jan Brown
Laura Stephenson, Argyll and Bute Health and Social Care Partnership
Rhona Grant, Community Learning Services, Live Argyll
PS Helen Moffatt, Police Scotland
Stephen Kelly, Scottish Fire and Rescue Service
Rhona Altin, Argyll College UHI
Jen Broadhurst, Citizens Advice Bureau (CAB)
Alex Wilde, Shaping Places for Wellbeing, Improvement Service 
Becky Hothersall, Shaping Places for Wellbeing, Improvement Service
Cathleen Russell, Colintraive & Glendaruel Development Trust
John Weir, Bute BID Manager
Douglas McHugh, Strachur Men’s Shed
Susan MacRae, Skills Development Scotland
Marie Stonehouse, Argyll and Bute Climate Action Network
Reenie Kennedy-Boyle, Fyne Futures
Dee Locke, Cormonachan Community Woodlands
Sheena Findlay, Argyll College UHI
Lauren Worrell, NFU Scotland
Amanda Graham, Dunoon Community Council
John Brint, Ardentinny Community Council
Page 13 Agenda Item 3b

Page 14

Adrian Curtis, Cairndow Community Council
Louise Brownlee, Cairndow Community Council
Andrew Galloway, Local Democracy Reporter, Argyll and Bute 
1. WELCOME AND APOLOGIES 
The Chair welcomed everyone highlighting some new members of the Group including
new Community Council representatives. The Chair also added his thanks to Councillor
Liz McCabe who chaired the last meeting in his absence. 
Apologies for absence were intimated on behalf of: 
Michelle Mundie, Chief Executive, Argyll Community Housing Association Ltd;
Sandy McLeod, Argyll and Bute Third Sector Interface; 
Becs Barker, Carr Gomm;
Jean Maskall, Sandbank Community Development Trust;
Councillor Audrey Forrest; 
Barry Colvan Scottish Fire and Rescue Service; 
Sergeant Eddie McGunnigal, Police Scotland; and 
Jean Moffat, Bute Community Council 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest intimated. 
3. MINUTES 
(a) Meeting of the Bute and Cowal Community Planning Group held on 1
November 2022 
The minutes of the Bute and Cowal Area Community Planning Group meeting held
on Tuesday 1 November 2022 were approved as a correct record.   
4. GOVERNANCE 
(a) Area Community Planning Group Governance Arrangements 
The group gave consideration to a report which outlined the governance
arrangements of the Bute and Cowal Area Community Planning Group (Area CPG)
specifically the Terms of Reference, membership and future meeting dates. 
The Committee Manager confirmed that organisational contacts could be updated
as required, and noted that any suggestions for new organisations to join the group
could be submitted to Stuart McLean or Julieann Small following the meeting. 
Page 14

Page 15

Decision 
The Bute and Cowal Area Community Planning Group: 
1. considered and adopted the Terms of Reference submitted at Appendix 1 of the
report and to agreed that they would be reviewed on an annual basis to ensure
their ongoing currency and appropriateness for the work of the Area CPG as it
developed over time; 
2. considered and agreed the membership of the group at Appendix 2 of the report
and  agreed that the membership of the group would be reviewed on an annual
basis to ensure currency and appropriateness for the work of the group as it
developed over time; and 
3. noted the dates for future meetings of Tuesday 2 May 2023, Tuesday 15 August
2023, Tuesday 31 October 2023, Tuesday 6 February 2024 and Tuesday 30
April 2024. 
(Reference: Report by, Committee Manager, Argyll and Bute Council, dated 7
February 2023, submitted) 
(b) Appointment of Vice-Chair of the Bute and Cowal Area Community Planning
Group 
The Group considered a report providing information relating to the appointment of a
Vice-Chair of the Bute and Cowal Area Community Planning Group and outlined the
expected time commitment and information about the role. 
Fyne Futures representative, Reeni Kennedy-Boyle, indicated her willingness to
accept this positon.     
Decision 
The Bute and Cowal Area Community Planning Group agreed that Reeni Kennedy-
Boyle be appointed as Vice-Chair. 
(Reference: Report by Committee Manager, Argyll and Bute Council, dated 7
February 2023, submitted) 
5. COMMUNITY PLANNING PARTNERSHIP MANAGEMENT COMMITTEE
UPDATE 
Consideration was given to a briefing note which provided information on matters
discussed during a meeting of the Community Planning Partnership (CPP) Management
Committee, held on 7 December 2022. 
The Committee Manager outlined a number of key highlights from the meeting, with it
being noted that the closing date for the consultation survey being conducted by the
MSYP’s in respect of the review of the Argyll and Bute Outcome Improvement Plan had
been extended until 14 February 2023. Partners were encouraged to take part in the
consultation, which can be found at Improving lives in Argyll and Bute (argyll-bute.gov.uk) 
Page 15

Page 16

Decision 
The Bute and Cowal Community Planning Group considered and noted the briefing note. 
(Reference: Report by Committee Manager, Argyll and Bute Council, dated 7 February
2023, submitted) 
6. PARTNERS UPDATE 
(a) Police Scotland Update 
Consideration was given to an update by PS Helen Moffatt. The update included
information on the ‘Not At Home Protocol’ which launched locally on the 9th of
January 2023; The Distress Brief Intervention which is being rolled out throughout
Argyll and Bute; the ‘Rural Watch Scotland’ extension of the Neighbourhood Watch
Scotland movement; the Local policing plan which is due to be released; the Police
youth volunteer programme and the Community speed watch. 
Discussion was had around sheep worrying and Lauren Worrell from NFU Scotland
highlighted that she was in the process of organisation small events in relation to the
Campaign and advised that she also had some signage which she was happy to
distribute to members of the Group. 
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided. 
(Reference: Report by Police Scotland, submitted) 
(b) Scottish Fire and Rescue Service Update 
The Group considered a report highlighting the Scottish Fire and Rescue Service’s
(SFRS) FQ3 review of local performance across Bute and Cowal for the period
2022-23. The report included information on the local firefighter training plan,
incidents during this time period and recent community engagement activities. 
Decision 
The Bute and Cowal Community Planning Group considered and noted the
information provided. 
(Reference: Report by Scottish Fire and Rescue Service, submitted) 
(c) Argyll and Bute Health and Social Care Partnership - Public Health Update 
The Group considered a public health update from Laura Stephenson, Argyll and
Bute Health and Social Care Partnership on the ongoing wellbeing and prevention
activities overseen and delivered by the HSCP Public Health Team in Argyll and
Bute. The update highlighted information on the launch of year 4 of the Living Well
(Self-Management) community capacity building fund; the Community Link Working
Page 16

Page 17

service; the newly launched Health Improvement website and health screening
awareness. It was highlighted that further information on NHS Screening
Programmes could be found at NHS Inform. 
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided. 
(Reference: Report by Health Improvement Lead, Argyll and Bute Health and Social
Care Partnership, submitted) 
(d) UHI Argyll - Rothesay and Dunoon Update 
The Group gave consideration to an update by Rhona Altin, UHI Argyll. The update
highlighted that all UHI Argyll Centres have provided additional support in response
to the rising living costs; they are now offering a wide range of free access courses;
intensive tuition in National 5 English and Maths is being offered for a fee which is
more affordable than private tuition; opens days were held in all UHI Centres in
November and January with a further open day scheduled for March; the Graduation
Ceremony for 2022 graduates was held in September 2022 and The Sawa
partnership project for New Scots reached completion in October 2022. 
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided. 
(Reference: Report by UHI Argyll, dated 25 January 2023, submitted) 
(e) Live Argyll - Community Learning Services Update 
The Group gave consideration to an update from Rhona Grant, Live Argyll -
Community Learning Service, which provided information on activities relating to the
Sawa project Bute which concluded in October 2022; cooking on a budget youth
sessions; Dunoon girls group; MSYPs consultation events and the new appointment
of LiveArgyll Community Learning Services Youth Team Leader. 
It was also added that Adult Learning activities and classes on Bute will resume
once the position for a new adult learning worker has been filled. 
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided. 
(Reference: Report by Rhona Grant, Team Leader – Community Learning Services,
Live Argyll, submitted) 
(f) Department for Work and Pensions Update 
The Group gave consideration to a written update from the Department for Work and
Pensions (DWP) providing statistical information on the number of customers
Page 17

Page 18

claiming universal credit and legacy benefits; job seekers allowance; employment
and support allowance; and income support. Further information was provided in
relation to a number of targeted packages of support for the most vulnerable which
included the benefit uprating; the new cost of living payments; the benefit cap rise
and employment and support allowance. 
Decision 
The Bute and Cowal Area Community Planning Group: 
1. considered and noted the information provided; and 
2. noted that in the absence of a representative from the DWP, any questions could
be forwarded to them following the meeting and any responses circulated to the
Group. 
(Reference: Report by Employer & Partnership Manager, Department for Work and
Pensions, dated 11 January 2023, submitted) 
(g) Argyll and Bute TSI Update 
The Group gave consideration to a written update by Argyll and Bute TSI which
included information on the Argyll & Bute Community Directory’s Self Service
Function which will allow organisations to update and maintain their listing
themselves; useful resources and warm spaces information in relation to the Cost of
Living Crisis; the TSI Inveraray Hub which is being offered as a warm space for
Organisations; fully funded distance learning qualifications with Skills Network
training and All our Children Network and the TSI Social Enterprise Network
meetings on the 14th and 15th of February 2023. 
Decision 
The Bute and Cowal Area Community Planning Group: 
1. considered and noted the information provided; and 
2. noted that in the absence of a representative from the Argyll and Bute TSI, any
questions could be forwarded to them following the meeting and any responses
circulated to the Group. 
(Reference: Report by Argyll and Bute TSI, submitted) 
(h) Argyll and Bute Citizens Advice Bureau Update 
The Group gave consideration to an update report from Argyll and Bute Citizen’s
Advice Bureau including information on the significant ongoing rise in requests from
clients for advice and support with energy costs; the recruitment campaign for
volunteer advisers; the annual consultation exercise and the research project for
2023. Partners noted that they could participate in the consultation which could be
found at:
https://www.smartsurvey.co.uk/s/ABCABCommunityPartnersSurvey/ 
Page 18

Page 19

Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided. 
(Reference: Report by Argyll and Bute Citizen’s Advice Bureau, submitted) 
(i) Scenic Sandbank Update 
The Group gave consideration to a report by Scenic Sandbank which highlighted
that they are a charitable community group run by volunteers which was created to
improve the area around Sandbank for the benefit of residents and visitors. The
report provided information on the Community Garden Project and the application to
the Scottish Land Fund to buy the former land close to the former Sandbank Primary
for a Community Garden, an outcome on this application is expected by early March
2023. There was no one in attendance from Scenic Sandbank to present the report. 
Decision 
The Bute and Cowal Area Community Planning Group: 
1.  considered and noted the information provided; and 
2. noted that in the absence of a representative from the Scenic Sandbank, any
questions could be forwarded to them following the meeting and any responses
circulated to the Group. 
(Reference: Report by Scenic Sandbank, submitted) 
(j) Isle of Bute Business Improvement District (BID) Update 
The Group considered an update by John Weir, Bute BID Manager. The update
included information provided within the associated November 2022 newsletter. 
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided. 
(Reference: Report by Bute BID, submitted) 
(k) Colintraive & Glendaruel Development Trust - Cost Of Living Crisis - Verbal
Update 
Cathleen Russell from Colintraive & Glendaruel Development Trust provided the
group with a verbal update on what the Organisation is doing to mitigate against the
Cost of Living Crisis. Cathleen advised that in September 2022 they held a public
meeting and brainstorming session to identify what the community wanted them to
pursue, a selection of ideas was chosen such as the distribution of a small pocket of
money to alleviate the cost of living crisis and the use of the Village hall as a
community hub and warm space. Cathleen advised that the Development Trust
continue to support members of the Community with a range of support available
such as prescription delivery.
Page 19

Page 20

Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided. 
(Reference: Verbal update by Cathleen Russell, Colintraive & Glendaruel
Development Trust) 
(l) Opportunity for verbal updates by Community Planning Partners 
Amanda Graham, Dunoon Community Council 
Amanda Graham, Secretary for Dunoon Community Council advised that the
Community Council is now up and running and highlighted that they have their
second Meeting on Monday 13th February 2023 at 7pm at the Queens Hall, with
everyone welcome to attend. 
Susan McCrae, Skills Development Scotland 
Susan McCrae of Skills Development Scotland provided the Group with a verbal
update on the ongoing work of the service. She highlighted many ongoing
collaborations with organisations and provided information on the current
Partnership Action for Continuing Employment (PACE) situation. 
Ailie Law, Community Development, Argyll and Bute Council 
Ailie Law, Community Development Officer provided the Group with an update on
behalf of the Community Development Team. The update included information on
the Outcome Improvement Plan which the team have been engaging recently with
elderly and disabled people using a non-digital format. Ailie advised that if partners
knew anyone who would like to complete the consultation by paper to get in contact
with her. 
Reeni Kennedy-Boyle, Fyne Future 
Reenie Kennedy-Boyle of Fyne Futures provided the Group with a verbal update
including information on the Argyll and Bute Employability Partnership; the
development of a digital wallet employability passport to help the unemployed; the
recent parental employment support fund pilot project focusing on child poverty and
other ongoing collaboration work with a variety organisations. 
7. SHAPING PLACES FOR WELLBEING 
Becky Hothersall, Community Link Lead for Shaping Places for Wellbeing Dunoon
provided the Group with a verbal presentation. The presentation introduced the Shaping
Places for Wellbeing project with it being highlighted that the overall aim of the project is to
improve Scotland’s wellbeing by reducing the health inequality while addressing the health
of the planet. Becky advised that there are 7 project towns and that the team will analyse
a range of Public Health data sources to understand how Dunoon is performing within an
Argyll and Bute and Scottish context. 
Page 20

Page 21

Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided. 
(Reference: Verbal report by Becky Hothersall, Community Link Lead, Shaping Places for
Wellbeing, Dunoon) 
8. COMMUNITY FOCUS 
(a) Strachur Men's Shed 
The Group considered a verbal presentation by Douglas McHugh, Treasurer for
Strachur Men’s Shed. Douglas advised that the Group first met back in February
2022 and advised that although it is named as a Men’s Shed it is a community shed
with male and female members. He added that they have got over 70 people
expressing an interest with many producing plants from their own sheds as they do
not have a Community Shed. 
Douglas highlighted that they have applied for many grants but have been
unsuccessful as they are not in a position to spend the money within the deadlines
set by funders. It was highlighted that around £100K would be required to build a
shed. Councillor Blair advised that the Supporting Community Grant Fund which can
be accessed on the Argyll and Bute Council website may be of interest for the Group
as the fund provides grants up to £2,500 which could help towards the costs. 
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided. 
(Reference: Verbal report by Douglas McHugh, Treasurer, Strachur Men’s Shed) 
9. CLIMATE CHANGE 
(a) Climate Change Working Group Highlight Report 
Consideration was given to a report which highlighted the ongoing work of the
Climate Change Working Group. The report outlined the proposal to produce a
strategic Action Plan as a means to address the climate emergency in Argyll and
Bute; the development of governance arrangements and structures to support the
Climate Change Project Officer post. It was highlighted that they are actively
pursuing the recruitment of a Project Manager to start this Action Plan work and
hope to have someone in post before the end of the financial year. 
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided. 
(Reference: Report by Chair of the Community Planning Partnership Climate
Change Working Group, dated 20 January 2023, submitted) 
Page 21

Page 22

(b) Home Energy Efficiency 
Jackie Westerman, Home Energy Efficiency Project Officer for Argyll and Bute
Council provided the Group with a verbal presentation on Home Energy Efficiency
and the funds available to people within Argyll and Bute. Jackie highlighted that the
premise of the Energy Efficient Scotland Scheme is to reduce carbon emissions to
contribute to the Scottish Governments aim to have 0% emissions by 2040, adding
that fuel poverty has been an important aspect of her work. Jackie reported that the
Energy Efficient Scotland Area Based Scheme is available to home owners or
private rented tenants with grant amounts dependent on property type and personal
circumstances, with awards starting at £8,500 for a flat and a maximum of £13,500
for a detached property. 
Jackie highlighted that from July 2022 until now, £1.12million has been spent in
Argyll and Bute and that more than 130 households in Argyll and Bute have been
insulated in this year’s programme. 
Action – Jackie to send Stuart McLean Home Energy Efficiency leaflet and
resources to circulate to the Group. 
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided. 
(Reference: Verbal report by Jackie Westerman, Home Energy Efficiency Project
Officer, Argyll and Bute Council) 
(c) Opportunity for verbal updates on community based initiatives 
Dee Locke from Cormonachan Community Woodlands gave a presentation to the
Group which provided information on the woodlands which is located in Argyll Forest
Park and the Loch Lomond and The Trossachs National Park. The presentation
included information on the current work being carried out and what visitors can
expect to find in the woodlands. It was highlighted that the woodlands received
grants and donations which went towards their big project which was to create 2km
of new paths which will be opened to the public between the end of April and early
May 2023. More information can be found at: https://cormonachan-woodlands.co.uk 
Dee invited Partners to visit the Woodlands which is free and open 24/7 all year
round. 
10. DATE OF NEXT MEETING 
The Chair thanked everyone in attendance at the meeting, and thanked all partners for
their continued proactive work in the community. 
The Group noted that the next meeting of the Bute and Cowal Area Community Planning
Group would take place on Tuesday, 2 May 2023 at 10am. 
Page 22

Page 23

MINUTES OF MEETING OF THE COWAL TRANSPORT FORUM HELD BY MICROSOFT TEAMS 
ON TUESDAY, 14 FEBRUARY 2023 
Present: Councillor Daniel Hampsey  (Chair)
Councillor Audrey Forrest
Councillor Ross Moreland
Councillor William Sinclair
Melissa Stewart, Governance Officer
Allan Comrie, Strathclyde Partnership for Transport (SPT) 
Iain Catterwell, Timber Transport Group 
Sergeant Eddie McGunnigal, Police Scotland 
Captain Alistair McLundie, Western Ferries 
Amanda Graham, Dunoon Community Council 
Graham Revill, Kilmun Community Council 
Kerris Bone, Kilmun Community Council 
Kirstie Reid, Strachur Community Council 
Ronald McAlister, Bute Ferry Group   
Attending: Liz Neilson and Valerie Edmonson (Public) 
1. APOLOGIES FOR ABSENCE 
The Chair welcomed everyone to the meeting and introductions were made. 
Apologies for absence were intimated by: 
Neil MacFarlane – Transport Scotland
Don McKillop – Cal Mac
Neil Stewart – West Coast Motors
Mike Breslin – South Cowal Community Council 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. MINUTES 
The minute of the meeting of the Cowal Transport Forum held on the Tuesday 15
November  2022 was approved as a correct record. 
The Chair highlighted matters arising from the last meeting, specifically his productive
meeting regarding the action at item 5(b) (Ferries Update: Western Ferries); that the letter
sent by the previous Chair to West Coast Motors could, unfortunately, not be traced but
inviting partners who may have this to send on to him; that the Council’s Roads
Department had taken on board previous comments about road closure consultations
raised with them;  and that with regard to the road markings in the Loch Eck area,
scheduled works had taken place in the latter part of 2022, with drainage being completed
and the road markings are in progress and were scheduled for completion at the end of
January 2023.
Page 23 Agenda Item 3c

Page 24

4. FERRIES UPDATE 
Calmac 
Having received apologies from Don McKillop it was noted that there was no
representative from Calmac present. 
Councillor Sinclair raised the issue of tickets on the Dunoon-Gourock service, commenting
that these have a very short time limit of one month whereas Western Ferries do not
include any use by date.  He also raised further concern about the 20 minute wait for train
connection from Gourock stating that this was not acceptable. 
Ronald McAlister, Bute Ferry Committee, raised concerns on the considerable delays in
the Calmac service due to no replacement vessel for the broken down Loch Dunvegan for
5 or 6 days, and the fact that the Isle of Cumbrae had been taken from her mooring in
Sandbank to Dunoon to run for only 4 hours.  He asked why had Calmac not considering
tying her up alongside the Loch Dunvegan or a nearby mooring. 
Kirstie Reid, Strachur Community Council, commented on the ferry delay figures which
she had received.  She advised of cancellation figures totalling 47 for
Colintraive/Rhubodach; 46 for Wemyss Bay/Rothesay and 1110 lost sailings for
Dunoon/Gourock.  She invited the group to ask for an explanation of why so many sailings
were cancelled from Calmac. 
Western Ferries 
Concerns were raised by Councillor Sinclair as to the size of the queues of traffic for the
ferry on the 29th December (Gourock side) and at the Dunoon Side on 2nd January, with
only 2 boats scheduled half hourly, with some travellers having to make alternative
arrangements.  Captain McLundie pointed out that there was an issue with one of the
vessels that had caused the issue on 29th December, that the reduced service for 2nd
January had been well publicised and as a result it was unfair to criticise about the
queueing.  A third boat would have required a crew to be willing to come out on a public
holiday but that this enhancement to service was put on from 1030hrs. Captain McLundie
also pointed out that it is impossible to gauge the amount and way people will travel since
the pandemic, but will consider the number of users from this year when planning cover
for next year’s festive period. 
Captain McLundie, updated the group on problems Western Ferries had suffered in with
the winter timetable.  This was a knock on from their dry dock routine where an issue was
detected meaning there was a two boat service for three weeks as new parts were sought
and fitted.  Unfortunately, the new parts failed on three occasions and he explained to the
group the extra effort to ensure that the queues were managed to minimise disruption.  He
further reported that another vessel was due to go to dry dock during the period and that
the MCA were asked for an extension to keep the vessel in service and the timetable
running as best as possible.  It is anticipated that the dry dock vessel will be back in
service by next month. 
Kerris Alexander, Kilmun Community Council, advised that although the crew do a
phenomenal job, she had turned up at Gourock Terminal on Boxing Day, where there was
a large queue waiting to board the ferry.  She commented that would like to see more
transparency on Facebook updating the waiting times and delays to enable ferry users to
Page 24

Page 25

make a judgement on their travel arrangements.   She also enquired about the £20 book
of tickets and where those could be purchased from.  In response Captain McLundie
commented that they do try to update the social media, but they prioritise updates of the
website, and that a list of agents for discounted tickets was also on the website.  Captain
McLundie agreed to take these points away for consideration. 
Councillor Sinclair raised a point on behalf of Hunter’s Quay Community Council who were
not present at the meeting.  He advised that they would like a meeting with the Council’s
Roads Department and Western Ferries concerning the signage for queuing traffic. 
Captain McLundie agreed to take this request away. 
Outcome: 
The Forum resolved: 
1. That the Chair would raise the point about ticket expiry, cover arrangements for the MV
Loch Dunvegan, high volumes of cancelled sailings from Dunoon and attendance of a
representative at future meetings with Calmac;
2. Captain McLundie would look into the issues on boxing day, potential for more service
updates via Facebook and the possibility of the round table with HQCC to discuss signage. 
5. PUBLIC TRANSPORT 
(a) Gourock train timetable 
The Chair advised that the written response with regards to the Gourock Train
Timetable was within the meeting pack and that he was happy to take any questions
back. 
Outcome 
The Forum noted the response. 
(b) West Coast Motors Update 
There was no representative from West Coast Motors attending the meeting, the
Chair advised that there was a written report within the meeting pack. 
Outcome 
The Forum noted the report. 
(c) Opportunity for verbal updates by Cowal Transport Forum Members 
Scottish Partnership for Transport (SPT) 
Alan Comrie of Scottish Partnership for Transport (SPT) gave a verbal update
advising that there was no reduction on service or fare increase on the 302 Carrick
Castle to Helensburgh bus route.  The SPT are liaising with Scotrail over the
Inverclyde Timetable. 
Alan also advised that concession fares had been frozen by Scotrail and Calmac
which helps with SPT funding so is a good thing within the Concession Fare
Scheme.  The next meeting of the Concession Fare Scheme is scheduled for 17th
March where a paper will be presented on the fares level.  He commented that the
cost of living crisis would be part of the considerations when reviewing fares.
Page 25

Page 26

Alan also hopes to meet with Calmac to discuss ticketing and concessions. 
Outcome 
The Forum noted the update. 
Public Transport 
Concerns were raised regarding the demise of the Dial-a-Bus and replacement with
the new Pingo Service in the Cowal Penisula which had a specific impact on elderly
users. 
Martin Arnold the Council’s Contract Officer within the Integrated Transport Team
gave a brief outline of what that section of the Council covers; School Transport,
Public Buses, Bus Stops and the infrastructure surrounding it. 
Martin advised that the Dial-a-Bus had evolved into the Pingo Service in partnership
with West Coast Motors which runs from Monday-Saturday covering a larger area of
the Peninsula, which had been requested for locally.   Due to low usage the Dial-a-
Bus had turned in to a “thirsty” Taxi running at 8 miles to the gallon and therefore
had not been cost effective.   
The Pingo service runs a smaller vehicle which is a 17 seater, low level and more fit
for purpose for the elderly, infirm and people living with disabilities.  In addition to the
app, Martin drew attention to the update provided at the meeting by West Coast
Motors noting the intention to launch a designated telephone line for the booking of
the bus and therefore the operator will get to know the customer’s needs.  Martin
asked that this enhanced service be rolled out so that effectiveness and usage could
be monitored among elderly users of the service. 
Outcome 
The Forum expressed some concerns that key partners were not in attendance for
the discussion; that there were times when the Pingo service was closely followed
by the service bus; and that there may be a need to enhance this service given
current user figures, perhaps looking also at reserved time slots on specific dates for
users over a specific age.  Martin Arnold agreed to take forward these issues with
management and also with West Coast Motors who deliver the service. 
6. ROADS UPDATE 
(a) Opportunity for verbal updates by Cowal Transport Forum Members 
The Forum noted that no Roads Officers were in attendance and the Chair
highlighted the following update received: 
Funding for road assessments – national strategy for 20mph zones 
Transport Scotland have been working with SCOTS and COSLA to identify the most
effective route to implement 20mph speed limits across Scotland. 
Page 26

Page 27

This follows a trial in the Scottish Borders council area which was run with input from
experts from Edinburgh Napier University, who carried out an independent
evaluation from 125 survey sites over 97 settlements. 
They found vehicle speeds have reduced in almost all settlements, in some
instances by 6mph, with an average reduction closer to 3mph. 
To support the national decision making process an assessment of the road network
is required to help identify the number of roads potentially affected and the financial
implications. 
To support this assessment the Scottish Government has allocated £1.4million
across Scotland’s 32 local roads authorities. 
Argyll and Bute Council has received £31,000 from this fund which has been used to
bring in a temporary resource to complete the 20mph road assessment. 
The results of this assessment will estimate the cost of measures to support 20mph
limits across the local road network. 
Following the outcome of the road assessment Transport Scotland will continue to
work closely with SCOTS and COSLA to better understand further cost implications
stemming from the yet to-be-agreed route for implementation of the strategy and,
subject to Ministerial approval, will seek to provide additional funding where
required. 
Place Criteria
The assessment exercise itself will be done in the context of a place criteria which
forms part of the National Strategy for 20mph Road Assessment Guidance (June
2022) 
Identifying any of the following place criteria will help to indicate the 30mph roads
which are considered appropriate for potential alteration to 20mph. The roads which
remain at 30mph will typically be on A and B Class roads with little frontage activity
and where people walking, wheeling and cycling do not need to share space with
motor traffic.
A minimum road length for the speed limit is suggested between 400-600m. The
length adopted will depend on the conditions at or beyond the end points. 
a) Is the road within 100m walk of any educational setting (e.g. primary, secondary,
further & higher education) 
b) Does the number of residential and/or retail premises fronting the road (on one or
both sides) exceed 20 over a continuous road length of between 400 - 600m.
Other key buildings should also be considered such as a church, shop or school.
c) Is the road within 100m walk of any community centre, church, place of worship,
sports facility, any hospital, GP or health centre. 
d) Does the composition of road users imply a lower speed of 20 mph which will
improve the conditions and facilities for vulnerable road users and other mode
shift (reflect on future plans such as active and sustainable travel, places for
Page 27

Page 28

people, consider existing and potential levels of vulnerable road users)
Will the road environment, surrounding environment, community and quality of life
impact (e.g. severance, noise, or air quality) be improved by implementing 20mph
speed limits. 
Assessment 
The steps we will take to conduct the assessment will include: 
 Carry out an initial desktop assessment of existing speed limits within Argyll
and Bute Council’s local road network;
 The assessment of existing 20mph limits should be completed against the
place criteria and consider
a. If the existing 20mph is sufficient (i.e. self-enforcing); or
b. The existing 20mph requires additional measures to meet compliance;
or
c. The existing 20mph should be amended to a 30mph
 The assessment of existing 30mph limits should be assessed on the
presumption that they will be reduced to 20mph.  The following should be
considered :
a. not all 30mph roads which meet the place criteria are appropriate for a
20mph speed limit. 
b. there are 30mph roads which do not meet the place criteria but are
suitable for 20mph. 
c. there are some 30mph roads that will remain at 30mph.
 Consultation with Elected Members
 Consultation with relevant bodies/organisations (e.g. public transport
operators, emergency services, community councils) to collate impact of
amended speed limits and any proposed traffic management measures.
 Compilation of the assessment form, including RAG status, proposed traffic
management measures and estimated costs.
 Produce and provide a GIS map containing the current position for the area
on existing 20 and 30mph roads.
 Produce and provide a GIS map containing the proposed 20 and 30mph
roads after the assessment.
We are aiming to complete this review exercise by the end of March 2023 and to
report this to EDI in June 2023. 
Following that submission we will continue to engage with Transport Scotland to
seek clarity on the next steps in the process. 
Outcome 
Page 28

Page 29

The forum noted the update. 
7. POLICE SCOTLAND 
Sgt Eddie McGunnigal updated the forum on the Speed Watch campaign and invited community
councils to meet with him individually or together to discuss this.  He also spoke regarding another
initiative which involved 30mph signs for wheelie bins and informed the Forum that officers were
conducting speed checks in the area, focusing on where there were complaints. 
The Forum discussed speed limits at Sandbank and why the 40 mph zone could not extend fully
into Sandbank but instead increased and reduced after the garage. 
Outcome 
Sgt McGunnigal agreed to raise concerns about speeding after 6pm on the A815 into
Sandbank with the Traffic Department. 
8. TRANSPORT SCOTLAND 
A written update was received on behalf of Transport Scotland which was read by the
Chair. 
Outcome 
The Forum noted that there are no major works planned on the A83. 
9. TIMBER TRANSPORT GROUP 
Iain Catterwell advised that there was no update at this time but that he was happy to
respond to any questions.   
Councillor Sinclair asked if there was progress on a voluntary 20mph zone at Sandbank
by drivers.  In response, Iain advised that it was a matter for hauliers but that their view
was they were legally driving to conditions.   
Kirstie Reid, Strachur Community Council, raised an issue with a pinch point that made it
difficult for 2 large vehicles to pass on the road together.  Iain invited Kirstie to get in touch
with him to discuss this as it might be possible to fund from Timber Transport Funding for
road improvements. 
10. DATE OF FUTURE MEETINGS 
The Chair thanked everyone in attendance at the meeting and the Group noted that the
Committee Manager would circulate a calendar invite for a meeting, possibly week beginning
8 May 2023 but that it may be the following week to avoid a clash with the Helensburgh and
Lomond Area Community Planning Group. 
Page 29

Page 30

This page is intentionally left blank

Page 31

1 
ARGYLL AND BUTE COUNCIL BUTE AND COWAL AREA
COMMITTEE 
CUSTOMER SUPPORT SERVICES   7 MARCH 2023 
AREA PERFORMANCE REPORT – FQ3 2022/23 
1 Background 
1.1 This paper presents the Area Performance Report for Financial Quarter 3 2022/23
(October to December 2022) and illustrates the agreed performance measures.
1.2 The features of the Performance Report are as follows:- 
 Indicators are grouped by Corporate Outcome.
 The data table for each indicator is colour coded to identify the level of
reporting.
o Area level measures are blue
o Council level measures are grey
o COI measures are white 
 Each indicator details the
o Target, Actual and Performance status (Green / Red / No Target) for the
current and three previous financial quarters.
o Commentary for the current financial quarter only.
o Narrative explaining the performance trend e.g. This indicator is above
Target and performance has improved since the last reporting period.
o Where appropriate a Performance Trend Line has been added.
o The name of the responsible officer.
o Where possible performance is presented at both Area and Council
level. 
It should be noted that Pyramid remains live and all measures can be navigated
as usual through the front screen. If support to navigate Pyramid is required please
email pyramid@argyll-bute.gov.uk 
1.3 The commentary for each indicator helps ‘Tell Our Story’ and enables Elected
Members to put the performance data into perspective and understand if an issue is
local in nature or should be escalated up to a Strategic Committee. 
1.4 To improve the response to performance queries, it is requested that either the
Responsible Named Officer or Sonya Thomas are contacted once the Quarterly
Performance Report is received with any queries. This should enable some
queries being resolved or clarified prior to the Area Committee meeting, and
therefore being carried forward as Actions at a subsequent meeting. 
2 Recommendations 
Page 31 Agenda Item 6

Page 32

2 
2.1 It is recommended that the Area Committee – 
a) Notes and considers the performance and supporting commentary as
presented. 
b) Upon receipt of the Quarterly Performance Report the Area Committee
contact either the Responsible Named Officer or Sonya Thomas with any
queries. 
c) Note that work is ongoing and to respond to Sonya Thomas with requests
or comments regarding the layout and format of the Performance Report. 
3.0 IMPLICATIONS 
3.1 Policy: None
3.2 Financial: None
3.3 Legal: None
3.4 HR: None
3.5 Fairer Scotland Duty: No impact assessment required for this report. 
3.5.1 Equalities: None. If requested the Area Committee Performance Report
can be supplied in a different format.
3.5.2 Socio-economic Duty: None
3.5.3 Islands: None 
3.6 Climate Change: None
3.7 Risk: None
3.8 Customer Service: None 
Kirsty Flanagan, Executive Director with responsibility for Customer Support
Services 
Jane Fowler
Head of Customer Support Services
8 February 2023 
For further information, please contact:
Sonya Thomas
Organisation Development Officer - Performance and Improvement
Customer Support Services
01546 604454 
Appendix 1: FQ3 2022/23 B&C Performance Report 
Page 32

Page 33

Appendix 1
Page 1 
Performance Reporting
Performance Reporting .............................................................................................................................................................................................................................. 1
All Areas .................................................................................................................................................................................................................................................. 4
Corporate Outcome No.1 – People live active, healthier and independent lives ............................................................................................................................ 5
COI – Maximise distribution of Scottish Welfare Fund ................................................................................................................................................................. 5
Corporate Outcome No.1 – People live active, healthier and independent lives ............................................................................................................................ 6
COI – Percentage of clients satisfied that they are better able to deal with their financial problems following our support and intervention ...................... 6
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................... 7
Number of parking penalty notices issued – Bute and Cowal ...................................................................................................................................................... 7
Number of parking penalty notices issued – Argyll and Bute ....................................................................................................................................................... 7
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................... 8
Car parking income to date – Bute and Cowal............................................................................................................................................................................... 8
Car parking income to date – Argyll and Bute ............................................................................................................................................................................... 9
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................. 10
Dog fouling – total number of complaints – Bute and Cowal ..................................................................................................................................................... 10
Dog fouling – total number of complaints – Argyll and Bute ...................................................................................................................................................... 10
Corporate Outcome No.3 – Children and young people have the best possible start ................................................................................................................... 11
COI – Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring plans in place .... 11
Corporate Outcome No.3 – Children and young people have the best possible start ................................................................................................................... 12
COI – Provide quality meals with cost margins to all pupils ....................................................................................................................................................... 12
Corporate Outcome No.4 – Education, skills and training maximises opportunities for all .......................................................................................................... 13
Maximise the percentage of 16-19 years olds participating in education, training or employment – Bute and Cowal .......................................................... 13
Maintain the percentage of 16-19 years olds in Argyll and Bute participating in education, training or employment services – Argyll and Bute ................ 13
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 14
Page 33

Page 34

Appendix 1
Page 2 
Number of affordable social sector new builds completed per annum – Bute and Cowal ....................................................................................................... 14
Number of affordable social sector new builds completed per annum – Argyll and Bute ........................................................................................................ 14
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 16
Percentage of pre-planning application enquiries processed within 20 working days – Bute and Cowal ................................................................................ 16
Percentage of pre-planning application enquiries processed within 20 working days – Argyll and Bute ................................................................................ 16
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 17
Householder planning applications – average number of weeks to determine – Bute and Cowal ........................................................................................... 17
Householder planning applications – average number of weeks to determine – Argyll and Bute ........................................................................................... 17
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 19
COI – The number of new homeless applicants who required temporary accommodation this period .................................................................................. 19
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 20
COI – Maintain the percentage of local suppliers that benefit from the awards of contracts via the procurement portal .................................................... 20
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 21
COI – Increase the number of community benefits that are delivered through contracts we award locally ........................................................................... 21
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 22
Street lighting – percentage of faults repaired within 10 days – Bute and Cowal ..................................................................................................................... 22
The percentage of street lighting faults are completed within 10 working days – Argyll and Bute .......................................................................................... 23
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 24
Total number of complaints regarding waste collection – Bute ................................................................................................................................................. 24
Total number of complaints regarding waste collection – Cowal ............................................................................................................................................... 24
Total number of complaints regarding waste collection – Argyll and Bute ............................................................................................................................... 25
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 26
COI – Percentage of waste recycled, composted and recovered ................................................................................................................................................ 26
Shanks – Percentage of waste recycled, composted and recovered .......................................................................................................................................... 26
Islands – Percentage of waste recycled, composted and recovered .......................................................................................................................................... 27
Page 34

Page 35

Appendix 1
Page 3 
H&L – Percentage of waste recycled, composted and recovered ............................................................................................................................................... 28
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 29
COI – The number of tonnes of waste sent to landfill ................................................................................................................................................................. 29
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 30
LEAMS (Local Environment Audit and Management System) – Bute ......................................................................................................................................... 30
LEAMS (Local Environment Audit and Management System) – Cowal ...................................................................................................................................... 30
LEAMS (Local Environment Audit and Management System) – Argyll and Bute ....................................................................................................................... 31
Making It Happen.............................................................................................................................................................................................................................. 32
Teacher sickness absence – Bute and Cowal ............................................................................................................................................................................... 32
Teacher sickness absence – Argyll and Bute ................................................................................................................................................................................ 32
Making It Happen.............................................................................................................................................................................................................................. 33
LGE staff (non-teacher) sickness absence – Bute and Cowal ...................................................................................................................................................... 33
LGE staff (non-teacher) sickness absence – Argyll and Bute ....................................................................................................................................................... 33
Making It Happen.............................................................................................................................................................................................................................. 34
COI – Increase the percentage of all self-service automated contacts ....................................................................................................................................... 34 
Page 35

Page 36

Appendix 1
Page 4 
All Areas 
FQ3 2022/23 Overall Performance Summary 
The information presented is a summary of the measures that are available on Pyramid. 
Unless stated otherwise, performance is presented at both Area and Council-wide levels. 
The measures show the performance against target for the current and previous three reporting periods with an explanation of performance trend. 
The data table for each indicator is colour coded to identify the level of reporting: 
 Area level measures are blue.
 Council level measures are grey.
 Corporate Outcome Indicators (COIs) are white. 
Where the measure is appropriate a Performance Trend Line has been added to illustrate performance over the reporting period. 
Page 36

Page 37

Appendix 1
Page 5 
Corporate Outcome No.1 – People live active, healthier and independent lives 
COI – Maximise distribution of Scottish Welfare Fund 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ4 2021/22 95.3% 120.7% Green
FQ1 2022/23 95.3% 87.5% Red
FQ2 2022/23 95.3% 115.1% Green
FQ3 2022/23 95.3% 129.2% Green 
The Performance has exceeded target and actual has increased since the last reporting period. 
FQ3 Comment 
The Council is maximising the distribution of this fund to support vulnerable people on low incomes tackle the cost of living challenges. As at 31 December spend
on the fund is £444,000 and is projected to increase to £624,000 by the end of March 2023. This is well above the annual budget of £458,338. The Scottish
Government has distributed more grant funding to Councils nationally to support them with the overspend and there is specific grant funding in earmarked
reserves to cover the overspend this year. Therefore there is no issue with the position in terms of overall available finance the importance is ensuring as many
households are support as possible during challenging times.   
Responsible person: Fergus Walker 
Page 37

Page 38

Appendix 1
Page 6 
Corporate Outcome No.1 – People live active, healthier and independent lives 
COI – Percentage of clients satisfied that they are better able to deal with their financial problems following our support and
intervention 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ4 2021/22 100% 100% Green
FQ1 2022/23 100% 100% Green
FQ2 2022/23 100% 100% Green
FQ3 2022/23 100% 100% Green 
This indicator for FQ3 has met the target with no change in performance since the last reporting period. 
FQ3 Comment
All of the clients provided with a Personal Debt Recovery Action Plan were satisfied. Out of 11 surveys issued 11 were returned showing 100% of clients satisfied. 4
of the 11 survey returns had comments showing their appreciation of the service and how it had helped them.
Responsible person: Lee Roberts 
Page 38

Page 39

Appendix 1
Page 7 
Corporate Outcome No.2 – People live in safer and stronger communities 
Number of parking penalty notices issued – Bute and Cowal 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 290 No target  
FQ1 2022/23 No target 266 No target
FQ2 2022/23 No target 517 No target
FQ3 2022/23 No target 403 No target 
This indicator for FQ3 shows the number of parking penalty notices has decreased since the last reporting period. 
FQ3 Comment
Free parking at Christmas time extended from two weeks to 16 days. Partial relining in town centre of Dunoon, still unlined/signed areas in Bute and Cowal.
Responsible person: Hugh O’Neill 
Number of parking penalty notices issued – Argyll and Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 1,188 No target 
FQ1 2022/23 No target 2,043 No target
FQ2 2022/23 No target 2,124 No target
FQ3 2022/23 No target 1,343 No target 
This indicator for FQ3 shows the number of parking penalty notices has decreased since the last reporting period. 
FQ3 Comment
Free parking before Christmas extended to 16 days, Pier Car Park in Helensburgh unenforceable at present and various lining issues throughout Argyll and Bute.
Responsible person: Hugh O’Neill 
Page 39

Page 40

Appendix 1
Page 8 
Corporate Outcome No.2 – People live in safer and stronger communities 
Car parking income to date – Bute and Cowal 
Performance is presented cumulatively for both Area and Council-wide levels. For individual car parks, the income is presented on a quarterly basis. 
Reporting Period
2022/23
Target
(Cumulative)
Actual
(Cumulative)
Status
FQ3 2021/22 £69,728 £32,046 Red
FQ4 2021/22 £85,258 £37,858 Red
FQ1 2022/23 £21,604 £4,237 Red
FQ2 2022/23 £53,904 £13,203 Red
FQ3 2022/23 £70,063 £29,825 Red 
This indicator for FQ3 shows the cumulative amount of income collected is significantly lower than the cumulative target. There is no Performance Trend Line as
this data is cumulative. 
FQ3 Comment 
The figures to date show an under-recovery of £40,238. It is difficult to ascertain the exact reasons for under-recovery in parking income however it can be
affected by such things as events, weather, commuting and a delay in processing of cash or credit/debit card payments can also be a factor. The impact of the
waiving charges for events in car parks, waiving charges in off-street car parks during winter festivals will likely have affected outturn.  
Responsible person: Hugh O’Neill 
Actual quarterly income collected in Bute and Cowal for FQ2 and FQ3. 
Car Park Location FQ2 Actual FQ3 Actual
Guildford Street, Rothesay £0 £184
Church Street, Dunoon £0 £929
Swimming Pool, Dunoon £675 £1,674
Dunoon Pier £657 £2,608
Moir Street, Dunoon £2,327 £3,266
Argyll Street, Dunoon £1,961 £2,783
Jane Villa, Dunoon £3,231 £5,062
B&C £116 £116
Page 40

Page 41

Appendix 1
Page 9 
Car parking income to date – Argyll and Bute 
Performance is presented cumulatively for both Area and Council-wide levels. 
Reporting Period  Target
(Cumulative)
Actual
(Cumulative)
Status
FQ4 2021/22 £807,078 £801,606 Red
FQ1 2022/23 £250,661 £165,678 Red
FQ2 2022/23 £625,430 £491,453 Red
FQ3 2022/23 £812,919 £709,585 Red 
This indicator for FQ3 shows the cumulative amount of income collected is significantly lower than the cumulative target. There is no Performance Trend Line as
this data is cumulative. 
FQ3 Comment 
Improved income in both MAKI and H&L areas but overall there is an under-recovery in income of £103,334. It is difficult to ascertain the exact reasons for under-
recovery in parking income however it can be affected by such things as events, weather, commuting and a delay in processing of cash or credit/debit card
payments can also be a factor. The impact of the waiving of charges for events in car parks, waiving charges in off-street car parks during winter festivals will likely
have affected outturn.  
Responsible person: Hugh O’Neill 
Page 41

Page 42

Appendix 1
Page 10 
Corporate Outcome No.2 – People live in safer and stronger communities 
Dog fouling – total number of complaints – Bute and Cowal 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 22 No target 
FQ1 2022/23 No target 13 No target
FQ2 2022/23 No target 15 No target
FQ3 2022/23 No target 19 No target 
This indicator for FQ3 shows the number of dog fouling complaints has increased since the last reporting period. 
FQ3 Comment
The number of dog fouling complaints has risen slightly in Bute to 7 and Cowal to 12. The warden service will continue to engage with all partners in an attempt to
deal with this problem.
Responsible person: Tom Murphy 
Dog fouling – total number of complaints – Argyll and Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 81 No target 
FQ1 2022/23 No target 61 No target
FQ2 2022/23 No target 45 No target
FQ3 2022/23 No target 47 No target 
This indicator for FQ3 shows the number of dog fouling complaints has increased slightly since the last reporting period. 
FQ3 Comment
There were a total of 47 dog fouling complaints received this quarter, although this is down slightly on last quarter, the Warden service will continue monitoring,
patrolling and educating on the issues of dog fouling in an attempt to reduce the number of complaints further, however it is difficult to catch a person committing
an offence as the majority of the complainants wish to remain anonymous.
Responsible person: Tom Murphy 
Page 42

Page 43

Appendix 1
Page 11 
Corporate Outcome No.3 – Children and young people have the best possible start 
COI – Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring
plans in place 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ4 2021/22 100% 100% Green
FQ1 2022/23 100% 100% Green
FQ2 2022/23 100% 100% Green
FQ3 2022/23 100% 100% Green 
This indicator for FQ3 is on track with no change in performance since the last reporting period. 
FQ3 Comment
There is individual tracking and monitoring in place on SEEMIS in schools for care experienced children and young people. In addition to this, the Principal Teacher
for care experienced children and young people monitors the information in SEEMIS and has subsequent conversations with staff in schools to ensure care
experienced children and young people are receiving all the support they need to achieve and that the staff in school have the right strategies in place to help the
child remain engaged with their education attainment and achievement. Often the care experienced health and wellbeing officers are used to provide extra
support for the child and the family.
Responsible person: Louise Lawson 
Page 43

Page 44

Appendix 1
Page 12 
Corporate Outcome No.3 – Children and young people have the best possible start 
COI – Provide quality meals with cost margins to all pupils 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 5.00% -4.00% Green 
FQ1 2022/23 5.00% 3.77% Green
FQ2 2022/23 5.00% 0.98% Green
FQ3 2022/23 5.00% 6.09% Red 
This indicator for FQ3 is above target and performance has decreased since the last reporting period. 
FQ3 Comment
Total Percentage variance for Argyll and Bute 6.09%. This is slightly over the target variance of 5%. We will continue to monitor any locations continuing to have
food cost percentages over this target.
Responsible person: Jayne Jones 
Page 44

Page 45

Appendix 1
Page 13 
Corporate Outcome No.4 – Education, skills and training maximises opportunities for all 
Maximise the percentage of 16-19 years olds participating in education, training or employment – Bute and Cowal 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 94.00% 92.88% Red 
FQ1 2022/23 94.00% 92.70% Red
FQ2 2022/23 94.00% 94.36% Green
FQ3 2022/23 94.00% 92.17% Red 
This indicator for FQ3 is below target and performance has decreased since the last reporting period. 
FQ3 Comment
As of 09/12/2022, the participation figure for B&C was 92.17%. This is 1.73% below the Argyll and Bute Participation figure for 2021/22 which was 93.90%.
Responsible person: Simon Easton 
Maintain the percentage of 16-19 years olds in Argyll and Bute participating in education, training or employment services – Argyll and
Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 94.00% 93.80% Red 
FQ1 2022/23 94.00% 94.00% Green
FQ2 2022/23 94.00% 93.90% Red
FQ3 2022/23 94.00% 93.90% Red 
This indicator for FQ3 is slightly below target. 
FQ3 Comment
The Annual Participation Measure for 2021/22 was released on 31st August 2022. In Argyll and Bute 93.90% of young people aged 16-19 were participating (in
work, training or education). This figure is 0.4% above the national average, (which is 93.5%). In total 3.8% of 16-19 year olds were not participating, which is 0.2%
below the national average, and 2.3% were unconfirmed, which is 1.3% below the national average.
As of 9 December 2022, the most up to date participation figure for Argyll and Bute stood at 93.92%.
Responsible person: Simon Easton
Page 45

Page 46

Appendix 1
Page 14 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Number of affordable social sector new builds completed per annum – Bute and Cowal 
Reporting Period Target Actual Status
FQ4 2021/22 0 0 Green
FQ1 2022/23 0 0 Green
FQ2 2022/23 0 0 Green
FQ3 2022/23 0 0 Green 
This indicator for FQ3 shows the number of completions has remained the same since the last reporting period. 
FQ3 Comment
No units were scheduled for completion in FQ3.
Responsible person: Allan Brandie 
Number of affordable social sector new builds completed per annum – Argyll and Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 45 45 Green 
FQ1 2022/23 36 36 Green
FQ2 2022/23 48 48 Green
FQ3 2022/23 37 37 Green 
This indicator for FQ3 has met the target for the reporting period. 
FQ3 Comment
37 units were completed in FQ3.
Responsible person: Alan Brandie 
Bute and Cowal – no units were completed.
Helensburgh and Lomond – no units were completed.
Mid Argyll, Kintyre and Islay – Argyll Community Housing Association Development at Millknowe: 1 wheelchair accessible (1 x 2 Bed Ground Floor Wheelchair Flat)
Page 46

Page 47

Appendix 1
Page 15 
Oban, Lorn and The Isles – Link Group Development at Dunbeg: 34 General Needs (2 x 1 Bed 2 Person Flat, 2 x 2 Bed 4 Person Flat, 20 x 2 Bed 4 Person House, 7 x 3
Bed 6 Person House, 3 x 4 Bed 7 person House), 1 Amenity (1 x 1 bed 2 Person Amenity Flat), 1 wheelchair accessible (1 x 1 Bed 2 Person Wheelchair Flat) 
Page 47

Page 48

Appendix 1
Page 16 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Percentage of pre-planning application enquiries processed within 20 working days – Bute and Cowal 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 75.0% 76.7% Green 
FQ1 2022/23 75.0% 75.0% Green
FQ2 2022/23 75.0% 45.5% Red
FQ3 2022/23 75.0% 50.0% Red 
This indicator for FQ3 is below target however performance has improved since the last reporting period. 
FQ3 Comment
The team processed 50% of pre-applications enquiries within 20 working days against a target of 75%. They did however, process 64% more pre-applications than
in the previous quarter.
Responsible person: Peter Bain 
Percentage of pre-planning application enquiries processed within 20 working days – Argyll and Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 75.0% 56.3% Red 
FQ1 2022/23 75.0% 60.5% Red
FQ2 2022/23 75.0% 64.7% Red
FQ3 2022/23 75.0% 52.5% Red 
This indicator for FQ3 is below target however performance has decreased since the last reporting period. 
FQ3 Comment
With 52.5% of pre-applications being processed within the target of 20 working days, it is accepted that the performance of handling of pre apps is currently below
expected standards it should however be recognised that the service is currently operating with reduced resource and high volume of statutory case work. Pre
applications are non-statutory case work items and therefore afforded a lower priority in relation to statutory casework and is reflected in reduced standard of
performance at this time.
Responsible person: Peter Bain 
Page 48

Page 49

Appendix 1
Page 17 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Householder planning applications – average number of weeks to determine – Bute and Cowal 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 8.0 weeks 12.3 weeks Red 
FQ1 2022/23 8.0 weeks 14.9 weeks Red
FQ2 2022/23 8.0 weeks 10.6 weeks Red
FQ3 2022/23 8.0 weeks 8.1 weeks Red 
This indicator for FQ3 has not met the target however performance has improved since the last reporting period. 
FQ3 Comment
This measure only relates to planning applications received for alterations to existing premises.
The team recorded an impressive average turnaround time of 8.1 weeks for householder applications during this financial quarter. The best result in over a year.
Responsible person: Peter Bain 
Householder planning applications – average number of weeks to determine – Argyll and Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 8.0 weeks 13.8 weeks Red 
FQ1 2022/23 8.0 weeks 12.4 weeks Red
FQ2 2022/23 8.0 weeks 13.1 weeks Red
FQ3 2022/23 8.0 weeks 12.0 weeks Red 
This indicator for FQ3 has not met the target however performance has improved since the last reporting period. 
FQ3 Comment
This measure only relates to planning applications received for alterations to existing premises.
Although a reduction of 1 week in average turnaround time was achieved on the last FQ, the headline performance figure of 12 weeks remains 50% above target.
Much of this is attributable to the MAKI team where the Development Manager continues to perform the role of Area Team Leader in addition to his own duties,
as has been the case for well over a year now. Whilst Officers may be processing householder applications timeously they are being held up awaiting managerial
scrutiny and sign off.
Page 49

Page 50

Appendix 1
Page 18 
Responsible person: Peter Bain 
Benchmarking
The year-end statistics from The Scottish Government were published on 31st August. FY21/22 benchmarking figures have now been updated and FY22/23 have
been forward projected in the usual way. Readers should note that our own Pyramid data in Development Management measures is "unadjusted", whereas that
of the benchmarks (represented by the blue and green columns on the graph) is adjusted for "clock-stopping". Clock-stopping is where The Scottish Government
allow for the removal of specific time periods for identified applications where delays were out with the control of the Local Planning Authority. 
Page 50

Page 51

Appendix 1
Page 19 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – The number of new homeless applicants who required temporary accommodation this period 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 37 No target 
FQ1 2022/23 No target 32 No target
FQ2 2022/23 No target 28 No target
FQ23 2022/23 No target 41 No target 
This indicator for FQ3 shows the number of applicants has increased since the last reporting period. 
FQ3 Comment
During FQ3, the housing service provided temporary accommodation for 41 new homeless households.
Responsible Person: Morven Macintyre 
Bute and Cowal – 15
Helensburgh and Lomond – 7
Oban, Lorn and the Isles – 15
Mid Argyll, Kintyre and Islay – 4 
Page 51

Page 52

Appendix 1
Page 20 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Maintain the percentage of local suppliers that benefit from the awards of contracts via the procurement portal 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 20.0% 13.5% Red 
FQ1 2022/23 20.0% 13.2% Red
FQ2 2022/23 20.0% 22.2% Green
FQ3 2022/23 20.0% 19.4% Red 
This indicator for FQ3 is below target and performance has decreased since the last reporting period. 
FQ3 Comment
19.4% - of the 11 bids made by local contractors, 7 were awarded the contract with a total value of over £139k. A summary of all contracts awarded in FQ3 is
available on Pyramid. The Procurement, Commercial and Contract Management Team continue to support local suppliers by providing useful information on the
Council’s website i.e. pre-recorded webinars on how to bid for Council contracts, hints and tips for tendering as well as our contract plan, details of upcoming
supplier development events and our category officer’s contact details all of which enable local suppliers to be able to bid for our contracts.
Responsible person: Anne MacColl-Smith 
Page 52

Page 53

Appendix 1
Page 21 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Increase the number of community benefits that are delivered through contracts we award locally 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ4 2021/22 No target 40 No target
FQ1 2022/23 No target - No target
FQ2 2022/23 No target 30 No target
FQ3 2022/23 No target - No target 
This indicator for FQ2 shows the number of community benefits since the last reporting period. 
FQ2 Comment
This indicator is reported in FQ2 and FQ4.
The team has been working closely with their suppliers to deliver additional social, economic and environmental value and achieved 30 community benefits
through Contract Management, Contract Awards and the Request List from 1st April 2022 to 30th September 2022. A summary of all contracts awarded in FQ2 is
available on Pyramid.
Responsible person: Anne MacColl-Smith 
Page 53

Page 54

Appendix 1
Page 22 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
Street lighting – percentage of faults repaired within 10 days – Bute and Cowal 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 75% 32% Red 
FQ1 2022/23 75% 32% Red
FQ2 2022/23 75% 65% Red
FQ3 2022/23 75% 33% Red 
This indicator for FQ3 is below target and performance has decreased significantly since the last reporting period. 
FQ3 Comment
We provide a network of almost 15,000 streetlights across the Council area which is maintained by a team of 3 full time electricians and 1 apprentice electrician. In
this last quarter we had 383 reported faults which means the performance in terms of the percentage of the network operational is in the region of 97.5%.     
In this quarter we have completed 79% more jobs than in the last quarter (383 vs 214). While the percentage of jobs completed on time has dropped, the overall
number of jobs completed has increased significantly.     
As well as attending to the day-to-day fault reports our street lighting team are progressing with the final stages of the LED scheme which will see all of our
network upgraded to a more energy efficient, more cost effective – this has already significantly reduced our carbon footprint. We will also be progressing a street
lighting capital programme of column replacements thanks to last year’s budget allocation.     
Overall the street lighting team performs well in both maintaining and improving the network. This particular performance indicator is not necessarily reflective of
the good work of the team and consideration is being given to other measures which could provide Members with a more comprehensive indication of lighting
performance. 
Responsible person: Tom Murphy 
Page 54

Page 55

Appendix 1
Page 23 
The percentage of street lighting faults are completed within 10 working days – Argyll and Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 75% 28% Red 
FQ1 2022/23 75% 29% Red
FQ2 2022/23 75% 48% Red
FQ3 2022/23 75% 30% Red 
This indicator for FQ3 is below target and performance has decreased significantly since the last reporting period. 
FQ3 Comment
We provide a network of almost 15,000 streetlights across the Council area which is maintained by a team of 3 full time electricians and 1 apprentice electrician. In
this last quarter we had 383 reported faults which means the performance in terms of the percentage of the network operational is in the region of 97.5%.     
In this quarter we have completed 79% more jobs than in the last quarter (383 vs 214). While the percentage of jobs completed on time has dropped, the overall
number of jobs completed has increased significantly.     
As well as attending to the day-to-day fault reports our street lighting team are progressing with the final stages of the LED scheme which will see all of our
network upgraded to a more energy efficient, more cost effective – this has already significantly reduced our carbon footprint. We will also be progressing a street
lighting capital programme of column replacements thanks to last year’s budget allocation.     
Overall the street lighting team performs well in both maintaining and improving the network. This particular performance indicator is not necessarily reflective of
the good work of the team and consideration is being given to other measures which could provide Members with a more comprehensive indication of lighting
performance. 
Responsible person: Tom Murphy 
Page 55

Page 56

Appendix 1
Page 24 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
Total number of complaints regarding waste collection – Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 0 No target 
FQ1 2022/23 No target 5 No target
FQ2 2022/23 No target 4 No target
FQ3 2022/23 No target 1 No target 
This indicator for FQ3 shows the number of waste collection complaints has decreased since the last reporting period. 
FQ3 Comment
There was only one waste collection complaint received for the Isle of Bute this quarter. Given the number of properties serviced, this is a very good level of
service.
Responsible person: Tom Murphy 
Total number of complaints regarding waste collection – Cowal 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 4 No target 
FQ1 2022/23 No target 4 No target
FQ2 2022/23 No target 8 No target
FQ3 2022/23 No target 1 No target 
This indicator for FQ3 shows the number of waste collection complaints has decreased since the last reporting period. 
FQ3 Comment
There was only one waste collection complaint received for the Cowal area this quarter. This again is a very good level of service given the number of properties
serviced.
Responsible person: Tom Murphy 
Page 56

Page 57

Appendix 1
Page 25 
Total number of complaints regarding waste collection – Argyll and Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 40 No target 
FQ1 2022/23 No target 58 No target
FQ2 2022/23 No target 65 No target
FQ3 2022/23 No target 35 No target 
This indicator for FQ3 shows the number of waste collection complaints has decreased significantly since the last reporting period. 
FQ3 Comment
The number of waste collection complaints has dropped from 65 last quarter to 35 this quarter. The Helensburgh/Lomond area received the majority of
complaints with 23, however given the operational and staffing difficulties and the number of domestic and commercial properties serviced this is still a good level
of service.
Responsible person: Tom Murphy 
Page 57

Page 58

Appendix 1
Page 26 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
COI – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 45.0% 48.3% Green 
FQ1 2022/23 45.0% 52.1% Green
FQ2 2022/23 45.0% 50.5% Green
FQ3 2022/23 45.0% 56.7% Green 
This indicator for FQ3 is above target and performance has increased since the last reporting period. 
FQ3 Comment
56.7% recycling/composting and recovery (39.7% recycling composting and 17.0% recovery). Recovery is higher than normal this quarter due to a trial by Renewi
(formerly Shanks), who have taken some residual general waste for disposal from their Moleigh (by Oban) and Dalinlongart (by Dunoon) facilities to an energy
from waste (EFW) plant near Edinburgh. This has reduced landfill overall and has more than offset the reduction in recovery from the Helensburgh and Lomond
area following on from The Scottish Government Landfill Tax Abatement Order (which commenced from 1st July 2022), whereby Barr Environmental no longer
carry out any recovery from mixed residual general waste.
Responsible person: John Blake 
Shanks – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 49.7% No target 
FQ1 2022/23 No target 54.4% No target
FQ2 2022/23 No target 58.1% No target
FQ3 2022/23 No target 67.4% No target 
This indicator for FQ3 shows the percentage of waste recycled has increased since the last reporting period.
Page 58

Page 59

Appendix 1
Page 27 
FQ3 Comment
67.4.% recycling/composting and recovery (40.0% recycling/composting and 27.4% recovery). Recovery is higher than normal this quarter due to a trial by Renewi
(formerly Shanks), who have taken some residual general waste for disposal from their Moleigh (by Oban) and Dalinlongart (by Dunoon) facilities to an energy
from waste (EFW) plant near Edinburgh.
Responsible person: John Blake 
Islands – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 38.4% No target 
FQ1 2022/23 No target 33.3% No target
FQ2 2022/23 No target 34.7% No target
FQ3 2022/23 No target 43.5% No target 
This indicator for FQ3 shows the percentage of waste recycled has increased since the last reporting period. 
FQ3 Comment
43.5% recycling/composting and recovery (43.5% recycling/composting and 0% recovery). Landfill has reduced this quarter mainly due to seasonality i.e. less
landfilled during late autumn/winter months with fewer visitors on islands. Year to date recycling/composting and recovery figure is 37.0% (i.e. 36.7% recycling/
composting and 0.3% recovery).
Responsible person: John Blake 
Page 59

Page 60

Appendix 1
Page 28 
H&L – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 48.9% No target 
FQ1 2022/23 No target 53.6% No target
FQ2 2022/23 No target 41.0% No target
FQ3 2022/23 No target 37.5% No target 
This indicator for FQ3 shows the percentage of waste recycled has decreased since the last reporting period. 
FQ3 Comment
37.5% recycling/composting and recovery (37.5% recycling/composting and 0% recovery). Following a Scottish Government Landfill Tax Abatement Order (which
commenced from 1st July 2022), Barr Environmental no longer carry out any recovery from mixed general waste delivered to them from Helensburgh and Lomond
area. Year to date figures for H&L are 43.5% recycling/composting and recovery (40.6% recycling/composting and 2.9% recovery).
Responsible person: John Blake 
Page 60

Page 61

Appendix 1
Page 29 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
COI – The number of tonnes of waste sent to landfill 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 5,000 4,252 Green 
FQ1 2022/23 5,850 4,546 Green
FQ2 2022/23 5,550 4,947 Green
FQ3 2022/23 5,100 3,882 Green 
This indicator for FQ3 is below target (lowest is best) and performance has increased since the last reporting period. 
FQ3 Comment
Landfill tonnages have dropped this quarter partly due to seasonality but mainly because of a trial by Renewi (formerly Shanks), who have taken some residual
general waste for disposal from their Moleigh (by Oban) and Dalinlongart (by Dunoon) facilities to an energy from waste (EFW) plant near Edinburgh. This has
reduced landfill overall and has more than offset the reduction in recovery from the Helensburgh and Lomond area following on from The Scottish Government
Landfill Tax Abatement Order (which commenced from 1st July 2022), whereby Barr Environmental no longer carry out any recovery from mixed residual general
waste.
Responsible person: John Blake 
Page 61

Page 62

Appendix 1
Page 30 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
LEAMS (Local Environment Audit and Management System) – Bute
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 73 79 Green 
FQ1 2022/23 73 81 Green
FQ2 2022/23 73 78 Green
FQ3 2022/23 73 80 Green 
This indicator for FQ3 is above target and performance has improved slightly since the last reporting period. 
FQ3 Comment
Again, this quarter for the Isle of Bute the level of street cleanliness has exceeded the National Standard and Benchmark Figure. This shows a good level of
performance.
Responsible person: Tom Murphy 
LEAMS (Local Environment Audit and Management System) – Cowal
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 73 77 Green 
FQ1 2022/23 73 78 Green
FQ2 2022/23 73 76 Green
FQ3 2022/23 73 76 Green 
This indicator for FQ3 is above target with no change in performance since the last reporting period. 
FQ3 Comment
The level of street cleanliness in Cowal this quarter remains steady and exceeds both the National Standard and Benchmark Figure, this shows a good level of
performance.
Responsible person: Tom Murphy
Page 62

Page 63

Appendix 1
Page 31 
LEAMS (Local Environment Audit and Management System) – Argyll and Bute
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 73 79 Green 
FQ1 2022/23 73 85 Green
FQ2 2022/23 73 82 Green
FQ3 2022/23 73 83 Green 
This indicator for FQ3 is above target and performance has increased since the last reporting period. 
FQ3 Comment
The level of street cleanliness for the whole area remains high, this is excellent and the role of the Amenity Warden has had a key influence around littering and
dog fouling to assist in maintaining the very good level of performance.
Responsible person: Tom Murphy 
Page 63

Page 64

Appendix 1
Page 32 
Making It Happen 
Teacher sickness absence – Bute and Cowal 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 1.99 days No target 
FQ1 2022/23 No target 1.97 days No target
FQ2 2022/23 No target 1.36 days No target
FQ3 2022/23 No target 2.36 days No target 
This indicator for FQ3 shows the number of sickness absence days has increased since the last reporting period. 
FQ3 Comment
Teacher absence is one day more than last quarter and half a day more than the same quarter last year. 
Responsible person: Simon Easton 
Teacher sickness absence – Argyll and Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 1.77 days No target 
FQ1 2022/23 No target 1.79 days No target
FQ2 2022/23 No target 1.22 days No target
FQ3 2022/23 No target 1.70 days No target 
This indicator for FQ3 shows the number of sickness absence days has increased since the last reporting period. 
FQ3 Comment
Work days lost have increased by almost half a day on last quarter but are similar to the same quarter last year. The top three reasons for sickness absence are: 
infections, stress/depression/mental health and stomach/liver/kidney & digestion.  Education have a dedicated Attendance Assistant that supports Head Teachers
to manage attendance.  To support with Stress related absences the Wellbeing Team have been trailing Active Care - a week one referral service to the Employee
Assistance Programme to support employees with appropriate interventions in early days of absence.  The Wellbeing Team have also co-ordinated the Recalibrate
Programme which was 12 weeks’ worth of online coaching attended by over 80 employees to support them to improve their own wellbeing.  The Wellbeing Team
have also just launched an online physiotherapy pilot and it is hoped members of Education will benefit from group sessions regarding musculoskeletal health.
Responsible person: Simon Easton
Page 64

Page 65

Appendix 1
Page 33 
Making It Happen 
LGE staff (non-teacher) sickness absence – Bute and Cowal 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 4.15 days No target 
FQ1 2022/23 No target 4.12 days No target
FQ2 2022/23 No target 3.76 days No target
FQ3 2022/23 No target 3.97 days No target 
This indicator for FQ3 shows the number of sickness absence days has increased slightly since the last reporting period. 
FQ3 Comment
Work days lost are slightly higher than last quarter but almost half a day less than the same quarter last year. 
Responsible person: Carolyn Cairns 
LGE staff (non-teacher) sickness absence – Argyll and Bute 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 No target 3.42 days No target 
FQ1 2022/23 No target 3.57 days No target
FQ2 2022/23 No target 3.66 days No target
FQ3 2022/23 No target 3.65 days No target 
This indicator for FQ3 shows the number of sickness absence days has decreased slightly since the last reporting period. 
FQ3 Comment
The top three reasons for absence were Stress/Depression/Mental Health; Heart, Blood Pressure and Circulatory and Other Musculoskeletal problems.  To support
with Stress related absences the Wellbeing Team have been trailing Active Care - a week one referral service to the Employee Assistance Programme to support
employees with appropriate interventions in early days of absence.  The Wellbeing Team have also co-ordinated the Recalibrate Programme which was 12 weeks’
worth of online coaching attended by over 80 employees to support them to improve their own wellbeing.  The Wellbeing Team have also just launched an online
physiotherapy pilot and it is hoped members of Roads and Infrastructure and HSCP will benefit from
Responsible person: Carolyn Cairns
Page 65

Page 66

Appendix 1
Page 34 
Making It Happen 
COI – Increase the percentage of all self-service automated contacts 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status Performance trend over the period
FQ4 2021/22 70.0% 73.1% Green 
FQ1 2022/23 70.0% 79.4% Green
FQ2 2022/23 70.0% 75.4% Green
FQ3 2022/23 70.0% 72.5% Green 
This indicator for FQ3 is above target however performance has decreased since the last reporting period. 
FQ3 Comment
In FQ3 there were 33,921 transactions dealt with by customer service agents (27.5%) and 89,449 automated or self-service transaction (72.5%) so the 70% target
was exceeded. FQ3 2021/22 2022/23 Mediated 36,387 33.921 Automated 94,272 89,449.
Responsible person: Robert Miller 
Page 66

Page 67

ARGYLL AND BUTE COUNCIL                                        BUTE AND COWAL AREA
COMMITTEE                                                                                                         
ROADS AND INFRASTRUCTURE                          07 MARCH 2023
SERVICES                     
ROADS AND INFRASTRUCTURE SERVICES UPDATE 
1.0 INTRODUCTION 
1.1 A Roads and Infrastructure standing report was a fixture on Area Committee
agendas throughout the life of the last Council. In the first two rounds of Area
Committee meetings in the new Council feedback was sought on the value of
these updates, and their format and frequency. Generally Members felt having a
standard item was beneficial and it was acknowledged that the Roads and
Infrastructure weekly briefings issued to all members each Friday afternoon
provide for the main sources of live information on current activities. On top of
these briefings there is a bank of resources on the new Member Zone system
which include the weekly briefings, subject specific briefings, ad hoc short
briefings on issues, relevant previous committee reports, operational service
procedures, legislation and Council policies. 
1.2 In the last Council the purpose of these reports was to provide an update on
service activities but since weekly briefings were introduced around 18 months
ago [at the time of writing this report we are on to briefing Edition 81] these have
largely superseded the original stated purpose of these reports. 
1.3 On the basis of the above this new format has been agreed through the
December round of area committees for this standing item. This format 
removes duplication for Officers and rather links to existing published
information, with additional updates only in the body of the reports if these are
specifically requested/noted from previous meetings. The report remains as a
standing item and continues to provide the opportunity for Officer engagement at
the committee meetings.   
2.0 RECOMMENDATIONS 
It is recommended that the Area Committee: 
2.1 Note and consider the contents of this report. 
3.0 DETAIL
Page 67 Agenda Item 8

Page 68

3.1 Roads and Infrastructure Services provides Members with weekly briefings on
topical service activities which are all available here.   
3.2 As part of the resources on the new Member Zone system there are various key
documents available in an online library here. 
4.0 CONCLUSION 
4.1 This report provides links to existing published information on service activities
and provides for the opportunity for Officer attendance and engagement at
committee meetings. 
5.0 IMPLICATIONS 
5.1 Policy – none 
5.2 Financial – none 
5.3  Legal – none 
5.4  HR – none known 
5.5  Fairer Scotland Duty: 
5.5.1   Equalities - protected characteristics – none known 
5.5.2   Socio-economic Duty – none known 
5.5.3 Islands – none known 
5.6. Climate Change – none 
5.7  Risk – none known 
5.8  Customer Service - none 
Executive Director with responsibility for Roads and Infrastructure Services,
Kirsty Flanagan 
Policy Lead for Roads and Transport, Councillor Andrew Kain 
January 2023                                                  
For further information contact: 
Jim Smith, Head of Roads and Infrastructure Services; or Mark Calder, Project
Manager
Page 68

Page 69

Page 69

Page 70

This page is intentionally left blank

Page 71

ARGYLL AND BUTE COUNCIL  BUTE & COWAL AREA COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH  
7 MARCH 2023 
HOUSING SERVICES ACTIVITY UPDATE - STRATEGIC HOUSING
INVESTMENT PLAN (SHIP) – ANNUAL UPDATE 
1.0 EXECUTIVE SUMMARY 
1.1 The main purpose of this report is to update Members of Housing Services 
activity within the Bute and Cowal area. 
This report will detail the following housing activity:-
 Housing Need and Demand
 Homelessness
 Affordable Housing Supply - Strategic Housing Investment Programme
(SHIP)
 Empty Homes
 Private Sector Housing Grant Adaptations
 Private Sector Housing Grant Repairs and Improvements
 Energy Efficiency - Home Energy Efficiency Programme: Area Based
Scheme(HEEP:ABS)
 Local Housing Strategy 
RECOMMENDATIONS 
Members are asked to consider the content of the report. 
Page 71 Agenda Item 9

Page 72

ARGYLL AND BUTE COUNCIL  BUTE & COWAL AREA COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH  
7 MARCH 2023 
HOUSING SERVICES ACTIVITY UPDATE - STRATEGIC HOUSING
INVESTMENT PLAN (SHIP) – ANNUAL UPDATE 
2.0 INTRODUCTION
2.1 The main purpose of this report is to update Members of Housing Services 
activity and the delivery of the Local Housing Strategy within the Bute and
Cowal area. 
This report will detail the following housing activity:-
 Housing Need and Demand
 Homelessness
 Affordable Housing Supply - Strategic Housing Investment Programme
(SHIP)
 Empty Homes
 Private Sector Housing Grant Adaptations
 Private Sector Housing Grant Repairs and Improvements
 Energy Efficiency - Home Energy Efficiency Programme: Area Based
Scheme
 Local Housing Strategy 
3.0 RECOMMENDATIONS
3.1 Members are asked to consider the content of this report. 
4.0 DETAIL
4.1 Argyll and Bute Council retains the role of strategic housing authority  and 
therefore has a series of important statutory housing functions to fulfil. A 
Housing Needs and Demand Assessment (HNDA) is carried out every 5 years
which  enables Scottish Government funding to be brought into Argyll and Bute 
primarily to deliver affordable housing. A comprehensive revision of the local
HNDA was approved as “robust and credible” by the Scottish Government’s
Centre for Housing Market Analysis in 2021. The Council also produces a Local
Housing Strategy (LHS) every 5 years. The LHS 2022-27 was approved by Full
Council in December 2021. 
The LHS has been developed in accordance with Scottish Government guidance
and local priorities as identified in the new HNDA. This sets out the vision for Argyll
Page 72

Page 73

and Bute: “Everyone in Argyll & Bute has access to a suitable, high quality
home which is affordable and located within a vibrant, sustainable and
connected community.” This report will detail the housing activity taking place
in Bute and Cowal and progress against the LHS Action Plan. 
4.2 HOUSING NEED & DEMAND IN BUTE & COWAL 
In addition there were 70 applicants for Bute and 147 for Cowal who received
nil points according to the Common Allocation Policy and therefore would be
deemed to have no housing need. 
For Bute & Cowal as a whole, the main requirement (52%) is for one bedroom
properties, while 28% require 2 bedrooms; 13% require 3 bedrooms; and 7%
need 4 or more. 
However, to establish actual need, the available supply must be factored
into this, based on the available lets within the RSL stock during a year. 
HOMEArgyll
Applicants
RSL Lets 2021/22
(HOMEArgyll only)
Pressure
Ratio
Bute 168 147 1:1
Cowal 366 131 3:1
Bute & Cowal 534 278 2:1 
This suggests the area may be experiencing a modest but not excessive
degree of pressure currently. 
While the pressure ratios are only one factor in determining need and
demand, they are useful indicators of areas where further research and
analysis may be required. 
The fully revised Argyll & Bute HNDA 2021 takes account of a wide range of
factors to determine existing need and future demand for new build housing,
and demographic projections have a critical role in this assessment. Although
the default population projections suggest a significant and continuous decline
across Argyll and Bute, and consequently minimal or zero requirement for new
build housing,  the council has developed ambitious Housing Supply Targets
based on an alternative, positive growth scenario for all areas. In this instance,
16% of the Argyll & Bute Housing requirement would be apportioned to Cowal
HOMEArgyll WAITING LIST November 2022 – Active
Applicants (excluding those with 0 points/no defined need)                                                             
Minimum Bedroom Size Required TOTAL
0/1beds 2beds 3beds 4+beds
Bute 98 42 17 11 168
Cowal 177 105 55 29 366
Bute & Cowal 275 147 72 40 534
Page 73

Page 74

and 6% to Bute; and over the next 5 years this could amount to around 340 new
builds across all tenures for the Bute & Cowal area as a whole. 
4.3 HOMELESSNESS 
There were 92 homeless presentations across Bute and Cowal in 2021/22. This
was a reduction from 111 applications in 2020/21 (17%). There was a decrease
of 64% (28 down to 10) in homeless presentations on Bute during 2021/22.
There was a decrease of 1% in Cowal (83 down to 82). 
During 2021/22, there were 12 homeless cases closed on Bute; and 89 in
Cowal. 
The figures below illustrate the number of homeless applications and cases
closed for the period from 2017/18 to 2020/21. 
The main reasons for presenting as Homeless last year were “disputes with
family/relationship breakdown”, “other action by landlord resulting in termination
of tenancy”; and “being asked to leave”. 
0
20
40
60
80
100
120
Applications Cases Closed Applications Cases Closed
Bute Cowal
Homeless Applications and Cases Closed
2017/18 -2021/22
2017/18 2018/19 2019/20 2020/21 2021/22
Page 74

Page 75

Rough Sleeping 
Bute and Cowal experienced a decrease in the incidence of rough sleeping over the
same period last year, with 7 cases (+1) in total across the area reporting that they
slept rough the night preceding their presentation and 12 (-8) reporting that they had
slept rough in the 3 months preceding their homeless application. These were
disaggregated as follows:- 
AREA Number of Rough Sleepers in 2020/21
Night Before Application 3 Months Prior to Application
Bute 1 1
Cowal 6 11
B&C Total 7 12
Argyll & Bute 17 28 
0 5 10 15 20 25 30 35
1. Termination of tenancy/mortgage due to rent…
10. Dispute with household/relationship…
11. Fleeing non-domestic violence
12. Harassment
13. Overcrowding
14. Asked to leave
15. Other reason for leaving…
2. Other action by landlord resulting in the…
3. Applicant terminated secure accommodation
4. Loss of service/tied accommodation
5. Discharge from prison/hospital/car/other…
7. Forced division and sale of matrimonial home
8. Other reasons for loss of accommodation
9. Dispute with household violent or abusive
Bute and Cowal
Reasons for Homelessness 2021/22
Cowal Bute
Page 75

Page 76

4.4 AFFORDABLE HOUSING SUPPLY 
This continues to be a very challenging period for the construction sector and
there is ongoing slippage in the new build programme due to disruption and
shortages with materials and staffing. The Strategic Housing Investment Plan
(SHIP) delivered 6 new affordable homes in Cowal in 2020/21. There were no
SHIP developments on Bute in this period. 
RSL PROJECT Units Funding
Fyne Homes Cairndow 6 £1,065,481 
In addition, further sites/projects in the Cowal area which are being progressed
or in early stages of development and may be programmed in the SHIP in the
future include: 
ACHA Eton Avenue, Dunoon – 4 units for particular needs, 2023 
Fyne
Homes
Rothesay Academy site, Rothesay – potential for development (20
units in SHIP)
Ballochgoy, Rothesay – 10 units to be delivered in 2023/24
Tighnabruaich - scope for additional units subject to demand (10
units included in SHIP) 
Page 76

Page 77

4.5 EMPTY HOMES 
In 2021/22 there were 15 private empty homes brought back into use in Bute &
CowaI, amounting to 39% of all empty homes brought back into use across
Argyll and Bute last year with assistance of Empty Homes Officer. 
Council Tax Information on Empty Homes 
The following table breaks down the numbers of empty homes including those
subject to premium Council Tax charge across the Bute & Cowal area.  The
table does not include properties which are empty and exempt from Council
Tax. The numbers of recorded empty homes can vary from day to day due to
natural changes and reported numbers are snapshot from November 2022
reports.   
BUTE & COWAL
Council tax data
as at 01.11.22
Number of
properties on
Council Tax
register
Empty
Homes
Properties
subject to 200%
council tax levy
Total 
EMPTY
Isle Of Bute 4,377 78 91 169
Cowal 8,794 98 112 210
TOTAL 13,171 176 203 379 
Council Tax Exemptions
There are also a number of empty properties which are on the Council Tax
register which are exempt from paying council tax.  In Bute & Cowal there are
403 properties which are empty and exempt from Council Tax. The categories
for empty properties include: 
 Class 4A = Properties recently occupied but now empty and unfurnished
(210)
 Class 7A = Dwellings Empty Under Statute – Closing or Demolition Order
(35)
 Class 6A = Deceased owners – where estate has not been settled (99)
 Class 8A= Held for demolition (16); 
 Class 5A= Living/detained elsewhere (23); 
 Class 19A= Difficult to let separately (1);
 Class 2A= Unoccupied-renovation (14);
 Class 13A= Repossessed dwelling (4) 
Second Homes
As at 1st November 2022 there were 441 registered Second Homes on Bute
and 558 in Cowal. The number second homes for Bute and Cowal (999)
represents 35% of the total number of Second Homes in Argyll and Bute (2815). 
Page 77

Page 78

Self-Catering Lets
As at 3rd November 2022 there were 471 self-catering lets on the Rates register
in the Bute & Cowal area.  20% of the Argyll and Bute total (2321). 
4.6 PRIVATE SECTOR HOUSING GRANT – ADAPTATIONS 
In 2021/22, there were 21 private sector properties adapted with PSHG aid in 
Bute & Cowal, and a total of 24 individual adaptations installed. 
4.7 PRIVATE SECTOR HOUSING GRANT – REPAIRS AND IMPROVEMENTS
In 2021/22, there were a total of 7 PSHG repair and improvement grants
completed in Bute & Cowal, (across Argyll and Bute, the total was 19). Total
cost of the works was £52,625.96 of which PSHG covered £18,469.95.This
was 37% of the total repair grant awarded for Argyll & Bute last year.   
4.8 ENERGY EFFICIENCY (HOME ENERGY EFFICIENCY PROGRAMME
SCOTLAND: AREA BASED SCHEME – HEEPS:ABS)
There were 252 energy efficiency measures installed across Argyll and Bute in
2020/21 via the HEEPS:ABS programme; and 28% of these measures (71)
were installed in Bute and Cowal. 
In total, 48 properties were improved across the Bute and Cowal area, at a total
cost of £273,625. Grant aid in support of this work amounted to £261,842. 
Current estimates of local Fuel Poverty are based on Home Analytics data
(Scottish figures sourced from Scottish House Condition Survey):- 
Area Likelihood of Households in 
Fuel Poverty Extreme Fuel Poverty
Bute 30% 17%
Bute & Cowal 
Rates data as at 03.11.22
Number of self-catering
properties
Bute 112
Cowal  359
Bute & Cowal TOTAL 471
PSHG ADAPTATION COMPLETIONS 2021 -2022
HMA Grant Value Works Value ADAPTATION INSTALLED      
Ramp Stairlift Access Bathroom
Adaptation
Bute £52,320.61 £65,400.77  0 1 0 8
Cowal £75,091.50 £86,852.84 0 4 2 9
TOTALS £127,412 £152,254 0 5 2 17
Page 78

Page 79

Cowal 24% 22%
Argyll and Bute 30% 25%
Scotland  (SHCS) 25% 12% 
4.9 LOCAL HOUSING STRATEGY (LHS) 2022-2027 
As the strategic housing authority for Argyll and Bute, the Council has a
statutory duty to develop, implement and monitor a Local Housing Strategy over
a five-year planning cycle, based on a robust and credible Housing Need and
Demand Assessment (HNDA) for the area.  Following completion of the
previous Argyll and Bute LHS (2016-2021) last year, a comprehensive revision
and update of the strategy has been approved by the Council and was formally
launched in April 2022. The planning process was based on a robust process
of consultation and stakeholder engagement, which has been acknowledged
as an exemplar model for other local authorities by the Scottish Government,
the CHMA, and the Scottish Housing Network LHS Forum.   
The revised HNDA was approved as “robust and credible” by the Scottish
Government’s CHMA in 2021, and this has informed the revised Housing
Supply Targets set out in the new LHS. These targets are based on a positive
demographic and economic growth scenario for Argyll & Bute and include
ambitious and challenging Housing Supply Targets for the Mid Argyll, Kintyre,
and Islay, Jura & Colonsay HMAs over the next 5 years and beyond. 
5.0 CONCLUSION
5.1 This report provides the detail of the Council Housing Services team activity in
the Bute and Cowal area and outlines progress with the Local Housing
Strategy. There are a variety of housing issues within the area which are being
tackled by Housing Services and partner agencies with the aim of delivering a
functioning housing system which meets the needs of the communities we
serve. 
6.0 IMPLICATIONS
6.1 Policy - Complies with approved SHIP and Local Housing Strategy.
6.2 Financial - none arising from this report.
6.3  Legal - we have a statutory duty to deliver statutory housing functions.
6.4  HR – none.
6.5  Fairer Scotland Duty: positive in terms of delivering affordable housing. 
6.5.1  Equalities - protected characteristics - none 
6.5.2  Socio-economic Duty - positive in terms of delivering affordable housing. 
6.5.3  Islands – positive in terms of delivering affordable housing on the islands.
6.6 Climate Change – the strategy and housing service deliver positive impacts for
energy efficiency and climate change.
6.7 Risk – none.
Page 79

Page 80

6.8  Customer Service – none. 
Kirsty Flanagan, Executive Director with the responsibility for Development and
Economic Growth 
Councillor Robin Currie, Policy Lead for Strategic Development 
January 2023 
For further information contact: 
Douglas Whyte
Team Lead – Housing Strategy 
E-mail: douglas.whyte@argyll-bute.gov.uk
Tel: 01546 604 785 
APPENDICES
Appendix 1 – Extract from LHS 2022 - 2027 (data as of 2021) Cowal
Appendix 2 – Extract from LHS 2022 - 2027 (data as of 2021) Bute  
Page 80

Page 81

Appendix 1 - Extract from LHS 2022 -2027 (data as of 2020) Cowal 
Cowal is projected to see a significant demographic decline if recent trends continue.
It is the mainland housing market most influenced by house purchasers from out with
Argyll and Bute – only 44% of sales in the area are to local residents. Average house
prices have actually been lower than most other HMAs in Argyll and Bute in recent
years, while household incomes are roughly average for the authority, making this one
of the relatively affordable housing market areas within the authority. Since 2015 the
total dwelling stock increased by over 5%, and currently Cowal accounts for 18% of
the authority’s housing. At the time of the last LHS, in 2015, almost 14% of the dwelling
stock was deemed ineffective to meet local needs, i.e. second/holiday homes and
long-term vacant properties. This has improved to 11%  of the total, albeit this remains
a substantial proportion of the housing stock. Over the last five years RSL homes have
increased by around 3%, bringing the total social rented stock in 2020 to 1,476 which
is 17% of the Argyll and Bute sector total. There are approximately 3 waiting list
applicants for every available let, and 20% of all homeless cases are located here;
therefore it is evident that despite some development activity and historic population
decline, a degree of unmet need remains. Parts of rural Cowal also fall within the
planning remit of the Loch Lomond & Trossachs National Park, and issues regarding
high levels of second/holiday homes, and affordability for permanent residents are
often exacerbated in these areas. 
Key issues for Cowal HMA: 
Although the rate of population decline would suggest that a surplus supply might be
generated from within existing housing stock and therefore the need for new build
would be minimal; nevertheless there are ongoing levels of unmet need in terms of
long waiting lists and relatively high homelessness, and a judicious, strategically
planned programme of new build could in fact help to support economic growth and
reverse the population decline as well as addressing specific unmet needs, such as
demand for specialist accommodation. 
Population                                     
Households                                   
Dwellings                                       
Ineffective Stock (%)  
RSL Stock  
Waiting List Applicants  
RSL Lets (2019/20) 
Pressure Ratio  
Lower Quartile House Price 
Lower Quartile Income  
LQ Affordability Ratio   
14,003
7,362
8,722
11%
1,476
400
131
3:1
£65,375
£14,617
4.5 
Cowal
Page 81

Page 82

Appendix 1 - Extract from LHS 2022 -2027 (data as of 2021) Bute 
Bute HMA is one of the least self-contained housing markets in Argyll and Bute,
with only 38% of house sales being to local residents. Almost 35% of
purchasers originate elsewhere in Scotland. Despite the lowest average
household income in Argyll & Bute, historically it has been by some way the
most affordable area in the authority with a local price to income ratio of 4.0.
Over the course of the last LHS, the number of dwellings increased very
marginally (0.4%), although total RSL stock has declined (due to a
demolition/reconfiguration programme), while the number of households
decreased by around 1%. Over 19% of the general housing stock is unavailable
to meet local need i.e. second/holiday homes or long-term vacant. While
evidence remains of potential over-supply in the RSL sector - with relatively
high annual turnover, areas of low demand, and the main landlords sustaining
a number of voids– nevertheless there are indications of increased market
activity and growing pressures. 
Key issues for Bute HMA: 
The main focus for Bute remains maintaining, repairing, improving and
managing the existing stock, across all tenures.
However, emerging perceptions on the island suggest that need for
additional, affordable housing may be growing as greater pressures are
becoming evident with increased market activity and more properties
potentially being lost from the effective, permanent housing stock. 
Tackling fuel poverty, improving energy efficiency and targeting Housing
Options advice and assistance remain priorities; as does supporting those
with particular needs to remain independent in their home or within the
community as far as possible. 
Population                                     
Households                                   
Dwellings                                       
Ineffective Stock (%)  
RSL Stock  
Waiting List Applicants  
RSL Lets (2019/20) 
Pressure Ratio  
Lower Quartile House Price 
Lower Quartile Income  
LQ Affordability Ratio   
5,981
3,372
4,247
19%
1,054
148
172
0
£45,000
£11,093
4.0 
Bute
Page 82

Page 83

Bute and Cowal Area Committee 
Workplan 2022-2023 
Committee Date Report Description Lead Service and
contact officer
Regularity of
occurrence/considera
tion
Date for
Reports to
Committee
Services
Additional
Comment
March 2023
7 March 2023 Area Performance
Report – FQ3 2022/23
Customer Support 
Services
Quarterly Report 10
February
2023 
7 March 2023 Roads and
Infrastructure Service
Update 
Roads and 
Infrastructure –
Jim Smith
Quarterly Report 10
February
2023 
7 March 2023 Strategic Housing
Investment Plan (SHIP)
Development and
Economic Growth –
Douglas Whyte 
Annual Report 10
February
2023 
7 March 2023 Lamont Bequest
Applications
Legal & Regulatory 
Support – 
Stuart McLean
As required 10
February
2023
2 Applications
received.
7 March 2023 Pupil Experiences Legal & Regulatory 
Support – 
Stuart McLean
As required 10
February
2023
Please see e-mail
from Simon Easton
03/02/2023
7 March 2023 Police Scotland – Roads
Update 
PS Eddie McGunnigal -
Eddie.McGunnigal@sco
tland.police.uk
As required 10
February
2023 
7 March 2023 Area Committee
Workplan 
Legal & Regulatory 
Support – 
Stuart McLean
Update 10
February
2023 
June 2023 
Page 83
Agenda Item
10

Page 84

Bute and Cowal Area Committee 
Workplan 2022-2023
Committee Date Report Description Lead Service and
contact officer
Regularity of
occurrence/considera
tion
Date for
Reports to
Committee
Services
Additional
Comment
6 June 2023 Supporting
Communities Fund
Applications 
Chief 
Executive – 
Kirsty Moyes
/Becky Hothersall 
Annual report 12 May
2023
Usually at March
Meeting but will be
coming to June
Meeting for 2023
only.
6 June 2023  Supporting
Communities Fund –
End of Project
Monitoring Report 
Kirsty Moyes/Rona Gold
Chief Executive
Annual report 12 May
2023 
6 June 2023 Quarterly Performance
Scorecard FQ4 2022/23
Customer Support 
Services
Quarterly Report 12 May
2023 
6 June 2023  Roads and
Infrastructure Services
Update
Jim Smith
Roads and
Infrastructure Services
Quarterly Report 12 May
2023 
6 June 2023 Primary School Report Simon Easton/Simone
McAdam
Education 
12 May
2023 
6 June 2023 Secondary School
Report - Dunoon
Grammar School
Report by Head
Teacher
Annual Report 12 May
2023 
6 June 2023 Secondary School
Report – Rothesay Joint
Campus 
Report by Head
Teacher
Annual Report 12 May
2023 
Page 84

Page 85

Bute and Cowal Area Committee 
Workplan 2022-2023
Committee Date Report Description Lead Service and
contact officer
Regularity of
occurrence/considera
tion
Date for
Reports to
Committee
Services
Additional
Comment
6 June 2023 HSCP Bi-Annual Update
Report
Charlotte Craig/Fiona
Davies
Argyll and Bute Health
and Social Care
Partnership
Bi-Annual Update  12 May
2023 
September 2023 
5 September
2022
Area Performance
Report – FQ1 2023/24
Customer Support 
Services
Quarterly 11 August
2023 
5 September
2022
Roads and
Infrastructure Service
Update 
Roads and 
Infrastructure –
Jim Smith
Quarterly Report 11 August
2023 
5 September
2022
Annual Recycling
Performance Report
Roads and 
Infrastructure –
Jim Smith
Annual Report  11 August
2023 
December 2023
5 December
2023
Quarterly Performance
Scorecard FQ2 2023/24
Jane Fowler/Sonya
Thomas
Performance and
Improvement
Quarterly Report 10
November
2023 
5 December
2023
Charitable Trusts,
Bequests and Trust
Funds
Legal & Regulatory 
Support – 
Stuart McLean
Annual Report 10
November
2023 
5 December
2023
ACHA Annual Update Chief Executive – ACHA  Annual
Report/Presentation
1
November
2022 
Page 85

Page 86

Bute and Cowal Area Committee 
Workplan 2022-2023
Committee Date Report Description Lead Service and
contact officer
Regularity of
occurrence/considera
tion
Date for
Reports to
Committee
Services
Additional
Comment
5 December
2023
HSCP Annual
Performance Report 
Health & Social Care 
Partnership – 
Charlotte Craig
Annual Report 10
November
2023 
5 December
2023
The Third Marquis of
Bute’s Silver Wedding
Dowry Fund
Legal & Regulatory 
Support – 
Stuart McLean
Annual Report 10
November
2023 
5 December
2023
The Provost’s fund
(Bute) – Award
Recommendations 
Legal & Regulatory 
Support – 
Stuart McLean
As required 10
November
2023 
5 December
2023
Roads and
Infrastructure Service
Update
Roads and 
Infrastructure – 
Jim Smith
Quarterly Report 10
November
2023 
5 December
2023
Local Housing Strategy
Annual Update
Development and
Economic Growth – 
Douglas Whyte
Annual Update 10
November
2023 
Page 86

Page 87

ARGYLL AND BUTE COUNCIL  BUTE AND COWAL AREA
COMMITTEE 
LEGAL & REGULATORY SUPPORT 7 MARCH 2023 XX MARCH 2021 
LAMONT BEQUEST AWARD RECOMMENDATIONS 
1.0 EXECUTIVE SUMMARY 
1.1 This report gives Members information regarding two applications that have
been received for support from the Lamont Bequest. 
2.0 RECOMMENDATIONS 
2.1 The Bute and Cowal Area Committee are asked to agree to award £100 to the
family applicant and £50 to the individual applicant that meet the criteria of the
Lamont Bequest. 
3.0 DETAIL 
3.1 The Bute and Cowal Area Committee on 01 December 2020 agreed new
distribution arrangements for the Lamont Bequest, which had been established
to support the poor of Kilfinan. In order to be considered for an award applicants
must; 
3.1.1 be in receipt of a qualifying benefit (Jobseekers Allowance, Employment
Support Allowance, Income Support, or Universal Credit) and for those
people who are employed/self-employed, they must be in receipt of some
amount of Universal Credit as well (a nil payment due to deductions for
earned income would mean they do not qualify); 
3.1.2 live within the Parish of Kilfinan, which includes everyone with a PA21
postcode; and 
3.1.3 be over the age of 16. 
3.2 Furthermore, it was agreed that successful individual applicants would receive
£50 while those applying on behalf of their family would receive £100. 
3.3 Two applications have been received, one on behalf of family and one on behalf
of an individual, both of which are recommended for award. Details of each
application can be found at appendix 1 and appendix 2. 
3.4 The total funds available for distribution from the Lamont Bequest are
approximately £4.7k. Should members be minded a total of £150 will be
awarded during this award cycle. 
4.0 CONCLUSION
Page 87 Agenda Item 11a

Page 88

4.1 Members are asked to consider two applications that have been received for
support from the Lamont Bequest and to approve the financial awards
recommended within this report.   
5.0 IMPLICATIONS 
5.1 Policy None 
5.2 Financial None, the Council acts as trustee for the Fund, it
does not represent assets of the Council. However,
there is a risk that the Council would have to repay
the Trust if an objection was raised as to the use of
the funds.
5.3 Legal Area Committees, as Trustees, must ensure that the
distribution arrangements comply with the terms of the
funds, failure to do so would result in the Council being
liable. 
5.4 HR None
5.5 Fairer Scotland Duty None
5.5.1 Equalities –
protected characteristics
None
5.5.2 Socio-economic
Duty
None
5.5.3 Islands None
5.6 Climate change None
5.7 Risk None
5.8 Customer Service None 
Douglas Hendry
Executive Director with responsibility for Legal and Regulatory Support 
February 2023                                                  
For further information contact: 
Stuart McLean, Committee Manager
Tel. No: 01436 658717
Email: Stuart.Mclean@argyll-bute.gov.uk 
APPENDICES 
Appendix 1 – Application 1
Appendix 2 – Application 2 
Page 88

Page 89

Document is Restricted
Page 89 Agenda Item 11bNOT FOR PUBLICATION by virtue of paragraph(s) 6
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 90

This page is intentionally left blank

Page 91

Document is Restricted
Page 91 Agenda Item 11cNOT FOR PUBLICATION by virtue of paragraph(s) 6
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 92

This page is intentionally left blank