Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD
30 May 2023 
NOTICE OF MEETING 
A meeting of the BUTE AND COWAL AREA COMMITTEE will be held ON A HYBRID BASIS IN
THE QUEEN'S HALL, DUNOON AND BY MICROSOFT TEAMS on TUESDAY, 6 JUNE 2023 at
10:00 AM, which you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. MINUTES 
(a) Bute and Cowal Area Committee - 7 March 2023 (Pages 5 - 12)  
(b) Bute and Cowal Area Community Planning Group - 2 May 2023 (Pages 13 - 20)  
(c) Cowal Transport Forum - 16 May 2023 (Pages 21 - 26) 
4. PUBLIC QUESTION TIME 
5. PRIMARY SCHOOL REPORT 2022-23 - BUTE AND COWAL AREA (Pages 27 - 42)  
Report by Executive Director with responsibility for Education 
6. SECONDARY SCHOOL ANNUAL REPORTS 
(a) Dunoon Grammar School (Pages 43 - 58)   
Report by Head Teacher, Dunoon Grammar School  
(b) Rothesay Joint Campus (Pages 59 - 76)   
Report by Head Teacher, Rothesay Joint Campus 
7. AREA PERFORMANCE REPORT - FQ4 2022/23 (Pages 77 - 110)  
Report by Executive Director with responsibility for Customer Support Services 
Public Document Pack

Page 2

8. ROADS AND INFRASTRUCTURE SERVICES UPDATE (Pages 111 - 114)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
9. CEMETERY MAINTENANCE AND ROADS ACCESS FUND (Pages 115 - 118)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
10. ARGYLL AND BUTE HSCP PERFORMANCE REPORT 2022/23 (Pages 119 - 160)  
Report by Chief Officer, Argyll and Bute HSCP 
11. DUNOON BID 3RD TERM BALLOT RESULTS 
Verbal Update by Bute and Cowal Development Officer 
12. SUPPORTING COMMUNITIES FUND 2023/24 (Pages 161 - 176)  
Report by Chief Executive 
REPORTS FOR NOTING 
13. ROTHESAY JOINT CAMPUS ELC DELIVERY (Pages 177 - 182)  
Report by Executive Director with responsibility for Education 
14. CRUACH MOR AND CLACHAN FLATS WINDFARM TRUSTS (Pages 183 - 190)  
Report by Executive Director with responsibilities for Legal and Regulatory Support 
15. DRAFT BUTE AND COWAL AREA COMMITTEE WORKPLAN (Pages 191 - 194) 
EXEMPT REPORT FOR DECISION 
16. LAMONT BEQUEST AWARD RECOMMENDATIONS 
(a) Report by Executive Director with responsibilities for Legal and Regulatory
Support (Pages 195 - 196)
E1  (b) Exempt Appendix (Pages 197 - 198)
E2 17. ROTHESAY TOWNSCAPE HERITAGE - RECOMMENDATION OF AWARD (Pages
199 - 206)  
Report by Executive Director with responsibility for Development and Economic
Growth 
The Committee will be asked to pass a resolution in terms of Section 50(A)(4) of the Local
Government (Scotland) Act 1973 to exclude the public for items of business with an “E” on the
grounds that it is likely to involve the disclosure of exempt information as defined in the
appropriate paragraph of Part I of Schedule 7a to the Local Government (Scotland) Act 1973. 
The appropriate paragraphs are:- 
E1 Paragraph 6 Information relating to the financial or business affairs of any particular person
(other than the authority). 
E2 Paragraph 8 The amount of any expenditure proposed to be incurred by the authority
under any particular contract for the acquisition of property or the supply of goods or
services.

Page 3

Bute and Cowal Area Committee 
Councillor Gordon Blair Councillor Audrey Forrest
Councillor Daniel Hampsey Councillor Reeni Kennedy-Boyle
Councillor Liz McCabe (Chair) Councillor Yvonne McNeilly (Vice-Chair)
Councillor Ross Moreland Councillor William Sinclair
Councillor Peter Wallace   
Contact: Julieann Small, Senior Committee Assistant - 01546 604043

Page 4

This page is intentionally left blank

Page 5

MINUTES OF THE MEETING OF THE BUTE AND COWAL AREA COMMITTEE HELD ON A
HYBRID BASIS IN THE QUEEN'S HALL, DUNOON AND BY MICROSOFT TEAM 
ON TUESDAY, 7 MARCH 2023 
Present: Councillor Liz McCabe (Chair) 
Councillor Gordon Blair
Councillor Audrey Forrest
Councillor Daniel Hampsey
Councillor Reeni Kennedy-Boyle 
Councillor Yvonne McNeilly
Councillor Ross Moreland
Councillor William Sinclair
Councillor Peter Wallace 
Attending: Stuart McLean, Committee Manager 
Mark Calder, Project Manager
Douglas Whyte, Housing Strategy Team Lead
PC Eddie McGunnigal, Police Scotland
David Mitchell, Head Teacher, Dunoon Grammar School
Alex Johnson, Senior Depute Head Teacher, Dunoon Grammar School
Salma Murray, Dunoon Grammar School
Charlotte Fish, Dunoon Grammar School
Emma Bancks, Dunoon Grammar School
Adam Smith, Dunoon Grammar School
Dale Somerville, Depute Head Teacher, Rothesay Joint Campus
Holly Reid, Rothesay Joint Campus
Kitti Carpenter, Rothesay Joint Campus
Ewan McMillan, Rothesay Joint Campus 
1. APOLOGIES FOR ABSENCE 
There were no apologies for absence intimated. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest intimated. 
3. MINUTES 
(a) Bute and Cowal Area Committee - 6 December 2022 
The Minutes of the meeting of the Bute and Cowal Area Committee, held on 6
December 2022 were approved as a correct record. 
(b) Bute and Cowal Area Community Planning Group - 7 February 2023 
The Minutes of the meeting of the Bute and Cowal Area Community Planning
Group, held on 7 February 2023 were noted. 
(c) Cowal Transport Forum - 14 February 2023 
The Minutes of the meeting of the Cowal Transport Forum, held on 14 February
2023 were noted.
Page 5 Agenda Item 3a

Page 6

The Chair ruled, and the Area Committee agreed, to a variation in the order of business.
The minute reflects the order in which items were discussed. 
4. PUPIL VOICE 
The Committee gave consideration to a verbal update from Pupils from Dunoon Grammar
School and Rothesay Joint Campus who outlined aspects of their learning journeys over
the years. 
Salma Murray, an S2 student from Dunoon Grammar School spoke of her transition from
Primary to Secondary School which was done virtually due to Covid restrictions. 
Charlotte Fish, an S3 pupil from Dunoon Grammar School spoke of her School trip to rural
Tanzania in which she and 16 other pupils volunteered in the Community. Charlotte
highlighted that it was an eye-opening experience, particularly the lack of facilities within
the Schools. 
S5 School Captains Emma Banks and Adam Smith from Dunoon Grammar School spoke
of their experiences within the Senior School and their chosen career pathways. 
Holly Reid, an S6 pupil from Rothesay Joint Campus spoke of her experience learning
online and independently which she felt had prepared her well for the future. 
S5 Pupil Ewan McMillan from Rothesay Joint Campus spoke of his plan to leave school at
the end of S5 year and attend College to study to become a Gamekeeper. Ewan further
advised that in preparation for this he had undertaken a one week summer placement with
a Gamekeeper. 
Kitti Carpenter, an S5 student from Rothesay Joint Campus spoke of her transition from
Primary to Secondary School and spoke of the Children and Young People Foundation
Apprenticeship which she is currently studying and highlighted her interest in continuing to
study Childcare in College in the future. 
On behalf of the Committee, the Chair took the opportunity to thank the pupils for taking
time out of their day to attend and wished them well in their future endeavours. 
Decision 
The Bute and Cowal Area Committee considered and noted the information provided. 
(Reference: Verbal Presentation by Pupil representatives from Dunoon Grammar School
and Rothesay Joint Campus) 
5. PUBLIC QUESTION TIME 
Question from Kirstie Reid, Strachur Community Council
Kirstie Reid, Strachur Community Council submitted the following question, which was
read out by the Committee Manager:-
We have been told there are currently 12 people on Argyll & Bute Council's home waiting
list whose first choice is Strachur.
Page 6

Page 7

Manse Gardens in Strachur is classified as amenity housing and consists of 21 properties.
Only 7 of these are currently occupied and the rest have been vacant for the past few
years.
The Trust Housing Association, who own Manse Gardens, are investigating the possibility
of redeveloping the properties to make them more acceptable to potential tenants.
Does Argyll & Bute Council support the redevelopment of Manse Gardens and, if they do,
what are they doing to ensure that this redevelopment goes ahead.
The Committee Manager delivered a response on behalf the Housing Strategy Team Lead
as follows:-
The short answer is yes, the Council is supportive of the redevelopment of Manse
Gardens to meet identified housing need and demand.
The Council has met with Trust Housing Association (HA) to discuss Manse Gardens and
we are meeting with the Scottish Government to discuss funding options. It is not as
straightforward as getting Capital Grant from the Scottish Government to build new
houses as the project is a reconfiguration of an existing Trust HA asset.
Question from Archie Reid, Strachur Community Council
Archie Reid, Strachur Community Council submitted the following question, which was
read out by the Committee Manager:-
As with many Community Councils we at Strachur Community Council are aware of the
high number of patients that now receive Care in the Community and are concerned about
the lack of care at home staff, we appreciate that this a nationwide issue but wonder what
Argyll and Bute Council is doing to encourage people into the area to take this form of
work. 
The Committee Manager delivered a response on behalf the Health and Social Care
Partnership as follows:-
All Care at Home providers are promoting opportunities in social care. Carrgomm, who
provide support in this rural area note good responses to recruitment and are actively
recruiting by fast tracking applications.
We are actively working with Human Resources and the Economic Development Team
targeting opportunities in key areas especially those affected by depopulation. 
The Integration Joint Board (IJB) continues to note workforce as a strategic risk, the
strategic workforce plan is monitored on a 6 monthly basis with work undertaken reported
through the public papers of the IJB. 
Question from Hunters Quay Community Council 
Hunters Quay Community Council submitted the following question, which was read out
by the Committee Manager:-
Ongoing issues with traffic queuing on the main road waiting to board a Western ferry at
the Hunters Quay terminal. I understand that there is a bit of a blame situation via the
Council and Western Ferries re who pays?
Page 7

Page 8

The situation is going to get worse with one of Scotland biggest and now award winning
holiday park companies getting bigger and spending millions. Hunters Quay Community
Council are concerned about speeding, and want flashing 30mph signs and also queuing
traffic signs.
The Project Manager advised that a Traffic Regulation Order was promoted at Hunters
Quay separately from the queuing issue and advised that as part of that process a speed
and volume survey was undertaken which found vehicle speed level acceptable, adding 
that at Council operated ferry sites they ensure that there is no queuing on public road. 
Question from Andrew Widdows
Andrew Widdows submitted the following question, which was read out by the Committee
Manager:-
Who in the Council and/or local business leaders is responsible and how are they directly
benefitting by refusing to allow a budget supermarket in Dunoon during a cost of living
crisis while local supermarkets are allowed to increase prices daily and therefore are
literally squeezing the life out of the poorest people in our town?" 
I would also hereby request that minutes of the meeting are made available to myself and
others upon request. I might also add that this question continuously draws a blank from
the council and one way or another I will find out the answers to this question and make
the results public and publicly embarrass those responsible if it isn't discussed at the
meeting. 
The Committee Manager assured elected members and members of the Public that the
agenda item is Public Question Time and as such all public questions whether submitted
in advance or raised at the meeting will always be recorded and added that there has
never been an instance nor will there ever be an instance where questions submitted will
not be discussed or recorded at the meeting.
The Committee Manager advised that on receiving this question he visited the planning
portal and there are no outstanding planning applications regarding this matter. He added
that Policy Planners also confirmed that no queries had been received from budget
supermarkets coming to Dunoon and colleagues in Economic Development also
confirmed that no supermarkets, budget or otherwise had expressed any interest in
coming to Dunoon.
Questions from Murray Doyle
I'd like to enquire whether the Serpentine Road, Rothesay, was considered as part of the
Capital budget repair program for this year? If not, what was the rationale of leaving it out,
I had requested on behalf of local cycling club Bute Wheelers for it be included in this
year's repair program? and why would the likes of the road out to Glecknabae be included
and Serpentine not? 
I'd also like to enquire about maintenance required to sections of A844, Bute's major A
road, that is in very poor condition. I did enquire in an email earlier this year, officers
mentioned that these issues would be noted and looked at. Mr Doyle noted that there is a
section of road between Meikle Grenach and A844 listed in the capital spend draft, which
in his opinion looks to be in very good condition, and wondered if the aforementioned
sections of A844 could benefit from this allocated budget instead?
Page 8

Page 9

The Project Manager advised that the Council have £8M for the roads Capital Programme
but there is not enough money to make the roads to the standards wanted. The Project
Manager advised that he would provide Mr Doyle with information on how decisions are
made for the Roads Capital Programme.
Questions from Jennifer Wilson
Jennifer Wilson submitted the following question, which was read out by the Committee
Manager:-
What policy do they have in place to tackle the scourge of derelict properties?
In Port Bannatyne on the Isle of Bute, specifically Buckingham Terrace (12, 14 and 16
Castle Street) and No. 21 Castle Street are derelict properties within a residential area.
Can you confirm if these buildings have been removed from the Council Tax Register
pending redevelopment and, if so, for how long has this been the case? 
Buckingham Terrace, I understand, was bought via a compulsory purchase order by the
Isle of Bute Housing Association in the late 1990's to provide affordable housing
locally, however, this was never completed. During and since that period can you confirm
whether any grants (public money) have been paid out for redevelopment and the total
amount paid out for redevelopment, to whom and dates. Were any timescales given to
complete redevelopment works?
No. 21 Castle Street is a derelict building covered entirely in scaffolding and advertising
sheets. Can you confirm whether a grant has been made available for redevelopment of
this building and, if so, has a timescale been given for completion of this work. 
Councillor McCabe advised that the Buckingham Terrace property is owned by a private
landlord and added that she had to contact them in the past to get the roof made safe with
it lying derelict for many years. 
The Housing Strategy Team Lead advised that the Council’s general approach is through
the Area Property Action Group and added that a Scheme of Assistance details advice
and information for Private Owners. 
6. AREA PERFORMANCE REPORT - FQ3 2022/23 
The Committee gave consideration to the Area Performance Report for financial quarter 3
of 2022/23 (October to December 2022) which illustrated the agreed performance
measures for this period. 
Decision 
The Bute and Cowal Area Committee:- 
1. noted and considered the performance and supporting commentary as presented; 
2. noted that upon receipt of the Quarterly Performance Report the Area Committee
should contact either the Responsible Named Officer or Sonya Thomas with any
queries; and 
Page 9

Page 10

3. noted that work is ongoing and to respond to Sonya Thomas with requests or
comments regarding the layout and format of the Performance Report and Scorecard. 
(Reference: Report by Executive Director with responsibility for Customer Support
Services, dated 8 February 2023, submitted) 
7. POLICE SCOTLAND ROADS UPDATE 
Consideration was given to a roads update by Sergeant Eddie McGunnigal, Police
Scotland. Sergeant McGunnigal highlighted that he had asked the Council to undertake
speeding surveys, confirming that on receipt of these surveys Police Scotland will target
speeding ‘hot spots’. He advised that Police Scotland had received very few speeding
complaints from residents, adding that most reports come from Community Councils
meetings he attends, he encouraged people to report any speeding so that they can target
the area. Sergeant McGunnigal highlighted that Community Speed Watch initiative is
being developed and speed signage for wheelie bins has been purchased which the
Youth Volunteers will be distributing. 
Decision 
The Bute and Cowal Area Committee considered and noted the information provided. 
(Reference: Verbal Update by Sergeant Eddie McGunnigal, Police Scotland) 
8. ROADS AND INFRASTRUCTURE SERVICES UPDATE 
The Committee gave consideration to a report which provided an update on the recent
activities of Roads and Infrastructure Services and highlighted works being undertaken
which were relevant to Bute and Cowal area. 
Decision 
The Bute and Cowal Area Committee: 
1. considered and noted the contents of the report; and 
2. supported the commitment made by the Council Leader during a recent meeting of the
Mid Argyll, Kintyre and the Islands Area Committee regarding future Member
engagement in advance of developing the Roads Reconstruction Capital Programme. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services, dated January 2023, submitted) 
9. HOUSING SERVICES ACTIVITY UPDATE - STRATEGIC HOUSING
INVESTMENT PLAN (SHIP) - ANNUAL UPDATE 
Consideration was given to a report which provided an update on Housing Services
activity and the delivery of the Local Housing Strategy within the Bute and Cowal area. 
Decision 
The Bute and Cowal Area Committee considered and noted the contents of the report.
Page 10

Page 11

(Reference: Report by Executive Director with responsibility for Development and
Economic Growth, dated January 2023, submitted) 
10. DRAFT BUTE AND COWAL AREA COMMITTEE WORKPLAN 
The Bute and Cowal Area Committee workplan was before members for information. 
Decision 
The Bute and Cowal Committee noted the contents of the workplan. 
(Reference: Bute and Cowal Area Committee workplan, dated 7 March 2023) 
11. LAMONT BEQUEST AWARD RECOMMENDATIONS 
The Committee gave consideration to a report providing information regarding two
applications that had been received for support from the Lamont Bequest. 
Decision 
The Bute and Cowal Area Committee agreed to award £100 to the family applicant and
£50 to the individual applicant who met the criteria for support from the Lamont Bequest. 
(Reference: Report by Executive Director with responsibility for Legal and Regulatory
Support dated February 2023, submitted) 
Page 11

Page 12

This page is intentionally left blank

Page 13

MINUTES OF THE MEETING OF THE BUTE AND COWAL COMMUNITY PLANNING GROUP HELD
BY MICROSOFT TEAMS 
ON TUESDAY, 2 MAY 2023 
Present: Charles Dixon-Spain (Chair) 
Stuart McLean, Committee Manager, Argyll and Bute Council 
Ailie Law, Community Development Officer, Argyll and Bute Council
John McLuckie, Community Planning Partnership Lead, Argyll and Bute Council
Kirsty Moyes, Community Planning Partnership Team Leader, Argyll and Bute Council
Lucy Dunbar, Community Planning Officer, Argyll and Bute Council
Ann Kennovin, Community Learning Worker, Live Argyll and Bute Council
Marie Stonehouse, Argyll and Bute Climate Action Network 
Reenie Kennedy-Boyle, Fyne Futures
Sheena Finlay, UHI Argyll
Martin Gerrish, Grow Food, Grow Dunoon
PS Eddie McGunnigal, Police Scotland
Becky Hothersall, Shaping Places for Wellbeing, Improvement Service
Councillor Gordon Blair
Councillor Liz McCabe
Councillor Audrey Forrest
Ann Campbell, SURF
Robert Trybis, Dunoon Gourock Ferry Action Group 
Rhona Grant, Community Learning Services, Live Argyll
Samantha O’Connor, SSEN
Karen Gill, Carr Gomm
Rory Munro, Argyll and Bute Health and Social Care Partnership
Sue McKillop, Scenic Sandbank
Iain MacNaughton, Scenic Sandbank
Sandy McLeod, Argyll and Bute Third Sector Interface
Stephen Kelly, Scottish Fire and Rescue Service
Tony McGloin, Scottish Fire and Rescue Service
Jean Moffat, Bute Community Council
Andrew Galloway, Local Democracy Reporter, Argyll and Bute
Julian Calvert, The Lochside Press
Chris Martin, Dunoon Observer 
1. WELCOME AND APOLOGIES 
The Chair welcomed everyone to the meeting and general introductions were made. 
Apologies for absence were intimated on behalf of: 
Lauren Worrell, NFU Scotland;
Rhona Altin, Argyll College UHI; 
Jean Maskell, Sandbank Community Development Trust;
Becs Barker, Carr Gomm; and 
John Weir, Bute BID.
Page 13 Agenda Item 3b

Page 14

2. DECLARATIONS OF INTEREST 
There were no declarations of interest intimated. 
3. MINUTES 
(a) Meeting of the Bute and Cowal Community Planning Group held on 7 February
2023 
The Minutes of the Bute and Cowal Area Community Planning Group meeting held
on Tuesday 7 February 2023 were approved as a correct record. 
The Committee Manager outlined a number of changes to the membership of the
Group. The Group noted the changes to the contacts for some organisations and
approved the updated membership. 
4. IMPROVING LIVES IN ARGYLL AND BUTE 
Consideration was given to a presentation by the Council’s Community Planning team on
their recent consultation ‘Improving Lives in Argyll and Bute’. The presentation included
information on the promotion of the consultation; the support provided for non-digital
participation and Community Groups and the responses received from the survey. It was
noted that the top three priorities were transport and infrastructure, housing and
community wellbeing. Information on how the information collated from the consultation
would be used to progress the 2023-2033 iteration of the Argyll and Bute Outcome
Improvement Plan (ABOIP) was also provided. 
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided. 
(Reference: Presentation by Community Planning and Development Team, Argyll and
Bute Council) 
5. COMMUNITY PLANNING PARTNERSHIP MANAGEMENT COMMITTEE
UPDATE 
Consideration was given to a briefing note which provided information on matters
discussed during a meeting of the Community Planning Partnership (CPP) Management
Committee, held on 23 March 2023. 
The Committee Manager outlined a number of key highlights from the meeting including
the Child Poverty Report; the work around financial Inclusion; the community wealth
building audit and the digital communities work. 
Decision 
The Bute and Cowal Community Planning Group considered and noted the briefing note. 
(Reference: Report by Committee Manager, Argyll and Bute Council, dated 2 May 2023,
submitted) 
Page 14

Page 15

6. PARTNER UPDATES 
(a) Police Scotland Update 
Consideration was given to an update which included information on the ongoing
work of the Service and provided information on road safety; the relaunch of the
Dunoon and Rothesay Police Scotland Youth Volunteer (PSYV); fraud prevention;
an Emergency Services Day planned in Dunoon and the roll-out of Naloxone to
officers in Argyll and West Dunbartonshire which is near complete. 
Discussion took place in relation to the new shift patterns proposed for the Bute and
Cowal Area. Sergeant Eddie McGunnigal advised that all shift patterns are posted
on Police Scotland’s website. 
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided. 
(Reference: Report by Police Scotland, submitted) 
(b) Scottish Fire and Rescue Service Update 
The Group gave consideration to a report highlighting the Scottish Fire and Rescue
Service’s (SFRS) FQ4 review of local performance across Bute and Cowal for the
period 2022-23. The report included information on the local firefighter training plan;
incidents during this time period; unwanted fire alarm signals; road and water safety
campaigns; community engagement activities; East and West Dumbartonshire and
Argyll and Bute Local Senior Officer Activities and home fire safety.   
Decision 
The Bute and Cowal Community Planning Group considered and noted the
information provided. 
(Reference: Report by Scottish Fire and Rescue Service, submitted) 
(c) UHI Argyll Update 
Consideration was given to an update by Sheena Finlay, UHI Argyll. The update
provided information on an open day held on the 28 March; Scottish Apprenticeship
Week; courses being offered and funding which was awarded to allow them to
employ a science, technology, engineering and mathematics Lego Facilitator to work
with Primary schools. 
The Group noted that UHI Argyll are currently seeking non-executive directors to join
their board of Governors with applications closing on the 12 May. 
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided. 
Page 15

Page 16

(Reference: Report by UHI Argyll, submitted) 
(d) Scenic Sandbank Update 
The Group gave consideration to an update by Scenic Sandbank which highlighted
that they had been awarded funding from the Scottish Land Fund to purchase
vacant ground in Sandbank for a community garden. It was advised that they had
produced a booklet at the start of the year which contained a survey in which they
got 48 responses with everyone looking forward to the new garden. 
It was noted that Scenic Sandbank are participating in the Keep Scotland Beautiful
initiative again this year and are encouraging the community join in. 
Decision 
The Bute and Cowal Area Community Planning Group: 
1. considered and noted the information provided; and 
2. noted that in the absence of a representative from Scenic Sandbank, any
questions could be forwarded to them following the meeting and any responses
circulated to the Group. 
(Reference: Report by Scenic Sandbank, submitted) 
(e) Argyll and Bute Council's Community Development Team Update 
Consideration was given to an update from Ailie Law, Community Development
Officer at Argyll and Bute Council. The update included information on assessments
which are currently being undertaken for Argyll and Bute Council’s 2023/2024
Supporting Communities Fund which closed for applications on 30 March 2023. 
The Group noted that recommendations would be made to Elected Members at
Area Committees in June for consideration on which organisations would receive
funding. 
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided. 
(Reference: Report by Community Development Officer, Argyll and Bute Council,
submitted) 
(f) Live Argyll - Community Learning Services Update 
The Group gave consideration to an update from Rhona Grant and Ann Kennovin
Live Argyll - Community Learning Services. The update provided information relating
to youth work in the area such as the Friday night football 7 week programme which
ran in February and March; the Easter GIVE programme; the collaboration with
Dunoon Grammar School on 2 school programmes and the Scottish Youth
Parliament Elections which are being held in November. 
Page 16

Page 17

The update also provided information on the continuing work on the SAWA New
Scots/Refugee project in Bute. 
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided. 
(Reference: Report by Team Leader – Community Learning Services, Live Argyll,
submitted) 
(g) Argyll and Bute Citizens Advice Bureau Update 
Consideration was given to a quarterly update from Argyll and Bute Citizen’s Advice
Bureau which provided statistical information highlighting the rise of clients and
advice being given by the Bureau in 2022/23 compared to 2021/22. The update also
provided information on the recruitment of volunteer advisors and the advice and
support CAB can provide. 
Partners noted that they could participate in a survey and give their views on the
work that the Bureau does in the community, which could be found at: Argyll and
Bute CAB Community Partner Survey 2023 (smartsurvey.co.uk) 
Decision 
The Bute and Cowal Area Community Planning Group: 
1. considered and noted the information provided; and 
2. noted that in the absence of a representative from the Argyll and Bute Citizens
Advice Bureau, any questions could be forwarded to them following the meeting
and any responses circulated to the Group. 
(Reference: Report by Argyll and Bute Citizen’s Advice Bureau, submitted) 
(h) Opportunity for Verbal Updates 
Dunoon Area Alliance Community Development Trust 
Ann Campbell provided the Group with a verbal update which included information
on funding which the Trust had received from the Scottish Government Investing in
Communities Fund Round 2 and from the National Lottery Community Fund. Ann
highlighted that the funding will cover posts for 3 years with recruitment under way
for 1 full time and 2 part time posts. It was added that once the Manager is in post
they will be working with Partners to look at developing a Local Place Plan for
Dunoon. 
7. SHAPING PLACES FOR WELLBEING 
Page 17

Page 18

Consideration was given to an update by Becky Hothersall, Community Link Lead for
Shaping Places for Wellbeing Dunoon The update provided information on Data gathering
on inequalities in Dunoon and Place and Wellbeing assessments. 
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided. 
(Reference: Report by Community Link Lead, Shaping Places for Wellbeing, Dunoon) 
8. ARGYLL AND BUTE HEALTH AND SOCIAL CARE PARTNERSHIP PUBLIC
HEALTH ANNUAL REPORT 
The Group considered a public health report on the ongoing wellbeing and prevention
activities overseen and delivered by the HSCP Public Health Team in Argyll and Bute. The
Interim Health Improvement Lead presented a number of key messages from the 2022
annual report of the Director of Public Health on Prevention. The full report can be found
at:- NHSH DPH Annual Report 2022 (adobe.com) 
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided. 
(Reference: Report by Interim Health Improvement Lead, Argyll and Bute Health and
Social Care Partnership, submitted) 
9. HOME ENERGY PLANS 
Consideration was given to a presentation by Samantha O’Connor from Scottish
and Southern Electricity Networks (SSEN). The presentation included information on who
SSEN are; what a Home Energy Plan is and the benefits of having one; support and help
available through the Priority Services Register and the benefits of joining. It was also
highlighted that SSEN have partnered with Home Energy Scotland (HES) to offer
customers free and impartial expert energy efficiency advice. 
The Group noted that Communities could apply for up to £20,000 of funding for building
resilience in the community through SSEN’s Annual Resilience Communities Fund which
would be opening for applications within the next 2 months. 
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided. 
(Reference: Report by Regional Customer Relationship Manager, SSEN, submitted) 
10. COMMUNITY FOCUS 
Page 18

Page 19

(a) Grow Food, Grow Dunoon 
The Group considered a report by Martin Gerrish on the Grow Food, Grow Dunoon
Project. Martin advised that the project is being delivered in collaboration with
Dunoon Community Development Trust and Kirn Primary school and that there are
now 8 volunteers with more wanting to join. Information was also provided on school
pupil’s involvement and on their highly productive food growing approach. 
It was highlighted that last year the group had grew enough food to sell and made
over £600 selling locally and at farmers markets. 
It was noted that a short video and slide show of pupils talking about their
experience in the garden could be found at: www.thegrowfoodproject.co.uk   
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided. 
(Reference: Report by Martin Gerrish, Grow Food, Grow Dunoon, submitted) 
(b) Dunoon Gourock Ferry Action Group (DGFAG) 
Consideration was given to a presentation by Robert Trybis from the Dunoon
Gourock Ferry Action Group. Mr Trybis highlighted that Dunoon to Gourock was the
first car ferry service in Scotland and that should the service be reintroduced it would
be a profitable one. 
Mr Trybis advised that the area suffered from poor connectivity due largely to the
uncertainly of the Rest and Be Thankful and the lack of integration between the
existing ferry services and the rail network. It was the contention of DGFAG that the
economy and population of Dunoon was suffering as a result with many young
people choosing to leave the area to study rather than commuting to and from the
area. 
It was noted that the DGFAG hoped that if the service was to remain as passenger
only that the vehicle service would be put out to tender in the near future. 
Reeni Kennedy-Boyle advised of a HITRANS consultation, which could be found at
https://hitrans-case-for-change-consultation-stantec.hub.arcgis.com/ 
Decision 
The Bute and Cowal Area Community Planning Group:- 
1. considered and noted the information provided; and 
2. requested that the Committee Manager relay the concerns of the Group
regarding the lack of a car ferry to service to Dunoon to the next meeting of the
CPP Management Committee.    
(Reference: Verbal report by Robert Trybis, Dunoon Gourock Ferry Action Group) 
Page 19

Page 20

11. CLIMATE CHANGE 
(a) Climate Change Working Group Highlight Report 
Consideration was given to a report which highlighted the ongoing work of the
Climate Change Working Group. The report outlined the proposal to produce a
strategic Action Plan as a means to address the climate emergency in Argyll and
Bute; the approved governance arrangements to support the Climate Change
Project Manager post and the ongoing work on the recruitment of a Project
Manager. 
Decision 
The Bute and Cowal Area Community Planning Group: 
1. considered and noted the information provided; and 
2. noted that in the absence of a representative from the Climate Change Working
Group, any questions could be forwarded to them following the meeting and any
responses circulated to the Group. 
(Reference: Report by Chair of the Community Planning Partnership Climate
Change Working Group, dated 27 April 2023, submitted) 
(b) Climate Action Hub 
Consideration was given to a presentation by Marie Stonehouse, Argyll & Bute
Regional Network Engagement Coordinator, Scottish Communities Climate Action
Network (SCCAN). The Presentation included information on the definition of
regional networks; Marie’s role as Regional Network Engagement Coordinator;
events attended by the network in the local area; the network hub; and upcoming
events. 
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided. 
(Reference: Verbal report by Argyll & Bute Regional Network Engagement
Coordinator, Scottish Communities Climate Action Network) 
(c) Opportunity for verbal updates on community based initiatives 
There were no verbal updates provided under this item. 
12. DATE OF NEXT MEETING 
The Chair thanked everyone in attendance at the meeting, and thanked all partners for
their continued proactive work in the community. 
The Group noted that the next meeting of the Bute and Cowal Area Community Planning
Group would take place on Tuesday 15 August 2023. 
Page 20

Page 21

MINUTES OF THE MEETING OF THE COWAL TRANSPORT FORUM HELD BY MICROSOFT
TEAMS 
ON TUESDAY, 16 MAY 2023 
Present: Councillor Daniel Hampsey (Chair) 
Councillor William Sinclair 
Councillor Gordon Blair
Stuart McLean, Committee Manager, Argyll and Bute Council
Martin Arnold, Contract Manager, Argyll and Bute Council
Neil MacFarlane, Transport Scotland
Captain Alistair McLundie, Western Ferries 
Gordon Ross, Western Ferries
Kerris Bone, Kilmun Community Council 
Graham Revill, Kilmun Community Council
Kirstie Reid, Strachur Community Council
Allan Comrie, Strathclyde Partnership for Transport (SPT)
Tom Warren, Dunoon Community Council
Iain Slorach, Calmac 
Attending: Liz Neilson, Resident in Sandbank
Andy Galloway, Local Democracy Reporter 
1. APOLOGIES FOR ABSENCE 
The Chair welcomed everyone to the meeting and introductions were made. 
Apologies for absence were intimated by: 
Sergeant Eddie McGunnigal, Police Scotland;
Neil Stewart, West Coast Motors;
Iain Catterwell, Timber Transport Group;
Councillor Audrey Forrest;
Councillor Ross Moreland;
Ronald McAlister, Bute Ferry Committee; and 
Don McKillop, Calmac, 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest intimated.   
3. MINUTES 
The minutes of the meeting of the Cowal Transport Forum held on Tuesday 14 February
2023 were approved as a correct record. 
The Chair highlighted matters arising from the last meeting, specifically in relation to the
attendance of the NHS at the Forum. The Chair confirmed that the NHS were not core
partners and any issues relating to patient transport should be directed to the Integration
Page 21 Agenda Item 3c

Page 22

Joint Board, adding that should there be any specific issues they would like to raise that
they could be invited to a future meeting.   
The Chair also advised that he continues to highlight the need for new Calmac ferries in
Dunoon and that Calmac are facing issues with tickets and expiry dates with it being noted
that an online booking system is soon to be launched which should help; concerns had
been raised with McGill’s Buses in relation to the large cuts in services in Inverclyde which
may cause issues for people travelling to and from Dunoon. 
4. FERRIES UPDATE 
Calmac 
The Forum considered an update from Iain Slorach from Calmac. Mr Slorach provided
information relating to reliability and punctuality statistics for March; the new booking
system which is to be launched this week, adding that expiry dates for tickets bought
under the new booking system will be extended until the end of the timetable period in
which they were bought. He also gave a commitment that Calmac will be looking at the
current timetable to align it with Scotrail’s newly published timetable and that they intend
to engage with Councillor’s and the Community Councils on this matter. 
The Chair advised that he was very pleased to hear about Calmac’s engagement with
Scotrail and highlighted his thanks to Councillor Sinclair for his continuous work on this
subject. 
Tom Warren advised that the digital timetable provided by Calmac online is an embedded
PDF which is not accessible for all. Mr Slorach advised that Calmac are aware of this and
that they are currently looking at improving the timetable formats this year. 
Discussion took place in relation to the carrying figures on the Gourock to Dunoon route
with it being noted that it was 30% down. Mr Slorach advised that they haven’t seen a
return on most routes to pre-covid figures. Councillor Sinclair advised that the removal of
Scotrail’s peak time tariff will make travelling cheaper and could increase service usage. 
Mr Slorach advised that he would make enquiries on passenger numbers with the
Operation’s Team and provide a fuller response at the next meeting of the Forum. 
Outcome 
The Forum: 
1. noted the update by Calmac; and 
2. noted that Mr Slorach would provide carrying figures for the Gourock to Dunoon
service at a future meeting and advise colleagues of Scotrail’s plans to remove the
peak time tariff. 
Western Ferries 
Gordon Ross from Western Ferries highlighted that they are running their summer
timetable and advised that they are waiting to see what the summer brings. 
Page 22

Page 23

In the absence of a representative from Hunters Quay Community Council the Committee
Manager read out the following question which was submitted in advance of the meeting: 
The public announcements (safety etc.) made on Western Ferry vessels have noticeably
increased in volume leading to complaints, Can this be addressed/adjusted? 
Mr Ross advised that Western Ferries monitor the sound levels but the public
announcement have to be at levels that customers can hear them and with the improving
weather conditions these announcements may sound louder and travel further. 
Gordon Ross enquired about proposals for Dunoon Pier and asked about progress. The
Committee Manager advised that this would be subject to consideration at the Harbour
Board and that he would contact Mr Ross as soon as a date for this had been agreed. 
Mr Ross enquired about a meeting on the 2nd of March which mentioned that new vessels
for Dunoon and Kilcreggan would be expected in 2026 and asked if Transport Scotland
could provide more information. 
The Committee Manager advised that he would submit this question to Transport Scotland
on behalf of the Forum and circulate the response once received. 
Councillor’s Sinclair and Hampsey wished Western Ferries a successful season ahead. 
Outcome 
The Forum: 
1. noted the update by Western Ferries; and 
2. noted that the Committee Manager would submit Mr Ross’s question to Transport
Scotland and circulate the response to the Forum. 
5. PUBLIC TRANSPORT 
Strathclyde Partnership for Transport (SPT) 
Allan Comrie advised that the Carrick Castle bus service fares have been frozen with the
service level being maintained and that the SPT have replaced some of the services
which were withdrawn with publically supported services. Allan further advised of changes
to Scotrail timetables highlighting the loss of 4 fast trains from Glasgow and 5 from
Gourock during the off peak period. Allan added that SPT have written to Scotrail and
Calmac offering to liaise with them to try and improve connection services and hope to
have a response from both soon. 
Mr Comrie advised that there is currently no increase to concessionary fare and added
that the SPT are mindful that customers are facing a Cost of Living Crisis. 
Kirstie Reid highlighted her concerns at the under 22 free bus travel and advised of the
publicity around young people going on buses and causing issues. 
Allan advised that the scheme is operated by the Scottish Government and that they are
legally obligated to ensure a safe environment for all passengers, adding that if any
passengers are making it unsafe drivers would be advised to contact the Police.
Page 23

Page 24

Outcome 
The Forum noted the update from SPT. 
Public Transport 
Kerris Bone highlighted that residents of Strone, Blairmore, Ardintinny, Kilmun and
surrounding areas would like to have the bus service back to pre-pandemic timetables. Ms
Bone advised that the lack of bus services are causing problems for people getting to and
from jobs. 
Martin Arnold advised that he is in continual discussions with bus operator’s to determine
the right level of service for the areas served and that he would discuss with West Coast
Motors to explore how the issues raised could be solved. 
Kirstie Reid highlighted the lack of bus services in Strachur on a Saturday and asked if the
Saturday services could be restored as the current service is not practical. 
Martin Arnold advised of the Pingo bookable service, which can be accessed by calling
01289 385506, and that he would take Kirstie’s comments away and provide an update at
the next Forum meeting. 
Discussion took place in relation to connectivity and the size of service vehicles available.
Mr Arnold advised he is working with operators to get the right sized vehicles for the
routes to ensure passenger demands are met. 
The Chair reported that he had been advised by South Cowal Community Council that the
bus service (489) no longer goes up North Campbell Road and asked why the decision to
cut this was made. Mr Arnold advised that he was aware of some issues with the buses
travelling the road due to them being low floor accessible and that the size of the vehicles
was also causing problems due to poor manoeuvrability within such a tight area. Mr
Arnold further advised of the Pingo provision which allows a more suitable vehicle travel to
use this loop, adding that he would take the comments back to West Coast Motors. 
Outcome 
The forum noted that the Contract Manager would liaise with West Coast Motors to
explore whether the bus service issues highlighted can be resolved and that an update
would be provided at the next meeting of the Forum. 
6. ROADS UPDATE 
In the absence of a representative from Hunters Quay Community Council (HQCC) the
Committee Manager read out the below questions which were submitted in advance of the
meeting: 
1. Signs indicating queuing traffic were ordered last April for placing either side of
Western Ferries terminal, where are they and what was the cost? 
2. Can HQCC have the results of the local speed survey (last year) and will this be
published? 
Page 24

Page 25

The Committee Manager advised that he had passed the questions onto colleagues in the
Roads Department and would circulate the response to the Forum once received. 
Councillor Sinclair highlighted that Transport Scotland had advised that both carriages at
the Rest and Be Thankful would be open to traffic this month. Neil MacFarlane advised
that he was not aware that there was a date for this and highlighted that Bear Scotland are
working as quickly as possible, advising that road resurfacing would commence on the
31st of May at the Rest and Be Thankful following the removal of the protective fencing. 
Kirsty Reid, Strachur Community Council advised that she had been approached
numerous times by a lady with disabilities who had been struggling to use the pavements
in Dunoon due to street furniture, cars being parked on the pavements and cyclists. Mrs
Reid advised she had reported it to the Council and had received an acknowledgment
email but no formal reply. 
The Committee Manager requested that Mrs Reid forward the acknowledgement email
and he would request Colleagues expedite the response. 
Liz Neilson, resident in Sandbank, enquired about the speed assessment in Sandbank
and asked if it had been done and if so when the results would be available. 
The Committee Manager advised that he would take note of the question and would pass
it to the relevant department on behalf of Liz. 
Councillor Sinclair advised that there was a speed survey carried out with new radar
equipment which monitors both ways and highlighted that he still does not have the
information back but would follow it up. 
Outcome 
The Forum noted that the Committee Manager would circulate a response to Hunters
Quay Community Council’s questions to the Forum once received. 
7. POLICE SCOTLAND 
It was noted that there was no representative from Police Scotland at the meeting. 
8. TRANSPORT SCOTLAND 
Neil MacFarlane from Transport Scotland provided the Forum with a verbal update.
Mr MacFarlane advised that that road resurfacing would be getting carried out at the Rest
and Be Thankful from the 31 May until the 11 June, with no works being carried out on
Friday and Saturday nights. The update also highlighted that layby and cycleway
vegetation cut-backs had been carried out on the A82 Loch Lomondside with more
planned and solar bollards had been installed at Loch Lomondside laybys with an
overhaul of the brown and white tourist signage at the same location also in planning. It
was also noted that overnight resurfacing works would be taking place along the A83 at
Campbeltown during the summer. 
Outcome 
The Forum noted the update. 
Page 25

Page 26

9. TIMBER TRANSPORT GROUP 
In the absence of Iain Catterwell the Chair provided the following update which was
submitted before the meeting: 
The normal timber haulage season is just starting and is going well in the Cowal area. The
Strategic Timber Transport Scheme hasn't reported yet, and until it does I’m unaware
whether or not the A8003 improvement proposal has been successful. 
Outcome 
The Forum noted the update. 
10. ANY OTHER COMPETENT BUSINESS 
There was no other business. 
11. DATE OF FUTURE MEETINGS 
The Chair thanked everyone in attendance at the meeting and the Group noted that the
Committee Manager would circulate a calendar invite for a meeting, week beginning 11
September 2023, in due course. 
Page 26

Page 27

1 
Argyll and Bute Council 2022 - 2023    
OUR CHILDREN…
THEIR FUTURE…
Education Service 
Primary Area Attainment Report:  
Bute and Cowal (B&C)
Page 27 Agenda Item 5

Page 28

2 
Introduction 
Within the Bute and Cowal area there are 14 Primary Schools, three on Bute and 11 in Cowal. 
There is secondary school provision at Dunoon Grammar School and Rothesay Joint Campus. 
Nursery provision is provided within several of these schools and Gaelic Medium Education is
provided at Sandbank Primary School.  Primary school rolls in Bute and Cowal vary considerably
ranging from 12 pupils (Kilmodan PS) to 270 (Kirn PS). 
This report provides a range of key information about school provision during the school
session August 2022 to June 2023 and reports the National collection of attainment and
achievement data from June 2022. 
Additional and more detailed information about each school can be found in the schools’
Standards and Quality Reports.  In addition each school’s Improvement Plan outlines their main
priorities for improvement.  Most schools have an active website where these documents can
be accessed and further links or information can be obtained from the Head Teacher.   
Page 28

Page 29

3 
Bute and Cowal School Profiles 2022-2023
Cluster Primary Schools 18/19 19/20 20/21 21/22 22/23
%
change
in Roll
over 5
years1
Dunoon Primary School 206 203 191 187 186 -10%
Inellan Primary School 32 28 29 41 38 +19%
Kilmodan Primary School 16 14 17 19 12 -25%
Kirn Primary School 276 274 273 252 270 -2%
Lochgoilhead Primary School 23 25 29 23 21 -9%
North Bute Primary School 33 36 38 39 26 -21%
Rothesay Primary 277 254 249 240 246 -11%
Sandbank primary School 63 70 62 56 60 -5%
Sandbank Primary School Gaelic
Unit 44 46 52 51 45 +2%
St Andrew’s Primary 53 50 58 56 71 +33%
St Mun’s Primary School 121 99 87 77 68 -44%
Strachur Primary 32 27 27 31 27 -15%
Strone Primary School 27 20 23 25 21 -22%
Tignabruaich Primary School 36 40 45 55 66 +83%
Toward Primary School 30 27 21 21 19 -37%
Total Roll for cluster 1269 1213 1201 1173 1176 -7.3% 
* Data for rolls provided at Census each year 
1 Please note the % change in Roll over 5 years shows the percentage change in roll figures from 2018/19 to 2022/23
and is not an average. 
SIMD Profile 
SIMD is the Scottish Government's standard approach to identify areas of multiple deprivation in
Scotland, with SIMD 1 indicating areas of highest deprivation and SIMD 10 indicating the least
deprived.  It can help improve understanding about the outcomes and circumstances of people
living in the most deprived areas in Scotland. It can also allow effective targeting of resources and
and funding where the aim is to wholly or partly tackle or take account of area concentrations of
multiple deprivation.   
Table shows number of pupils at each SIMD level in each area of Argyll and Bute. 
Area 1 2 3 4 5 6 7 8 9 10
Unkn
own TOTAL
Bute and
Cowal 186 159 233 108 255 219 32  0 17   20 1229
HALCO 40 83 105 50 130 223 274 352 192 138 33 1620
MAKI  0 84 115 137 128 568 301 0 0 1 4 1338
OLI 18  0 5 166 389 236 408 107  0 0 92 1421
Total 244 326 458 461 902 1246 1015 459 209 139 149 5608 
* SIMD data from March 2023
Page 29

Page 30

4 
Footwear and Clothing Grant and Free School Meal Information for AREA 
 Clothing and Footwear Grant (CFG) is not shown as a National Average as each authority set
their own criteria and therefore cannot be compared accurately. Please note that 2022-20223
data for CFG and Free School Meals (FSM) is to date (end February 2023) and therefore may
change as the year progresses. 
 In January 2022, the Scottish Government launched the extension of free school meal universal
eligibility to include all children in primary 1-5. The above figures only show those pupils in P6
and P7. 
 In August 2021 the Scottish Government introduced a School clothing grant minimum for all
authorities set at £120 for Primary pupils and £150 for Secondary pupils. 
 During session 2020/21 the Scottish Government introduced ‘Bridging’ payments of £130 per
pupil in receipt of FSM under the National criteria (this excludes anyone eligible who receive
FSM in P1 to P6 who do not qualify financially). These payments are made 4 times per year
(Easter, Summer, October and Christmas).Further information can be found at Scottish Child
Payment Bridging Payments - mygov.scot.  In addition to this anyone eligible for these
payments have been paid a FSM payment during the school holiday period. Further information
School meals - mygov.scot 
Page 30

Page 31

5 
Exclusion and Attendance Information for Bute and Cowal 
 Authorised absence includes bereavement, short – term exceptional domestic situations,
religious observance, weddings of immediate family. Unauthorised absence includes truancy,
unexplained absence and most family holildays during term time. Attendance and absence is
outlined in Management Circular 3.03. 
 During 2020/21 there were additional attendance codes added for COVID. These codes can
count as attendance, authorised absence or unauthorised absence depending on the
circumstance. 
 Please note that attendance data for 2022/23 is up to 28 February and not a complete year. It
is therefore subject to change. 
 Please note that exclusion data for 2022/23 is up to 28 February and not a complete year. It is
therefore subject to change. 
Page 31

Page 32

6 
Additional Support needs 
Table below indicates the numbers of pupils identified as having Additional Support needs across
the Bute and Cowal area at each stage of primary schools. 
Care Experienced Children and Young People
A virtual Head Teacher took up post in April 2023. The core purpose of the role of the Virtual Head
Teacher is to be relentless in driving improvements in the educational progress and
attainment/achievement of an identified group of young people, including Care Experienced,
across Argyll and Bute. The core function of the Virtual Head Teacher in terms of planning is to
ensure that all children have access to appropriate and timely support achieved by collaborating
with relevant professionals to ensure plans are of a high quality, with impact and outcomes
followed up.
The table below shows the numbers of care experienced children in our primary schools across
each area of the Council as of May 2023. 
Area Previously looked
after
Looked after at
home
Looked after
away from
home. 
Total
HALCO 14 4 11 29
OLI 13 2 5 20
MAKI 21 8 5 34
B&C 21 12 23 56 
Page 32

Page 33

7 
Attainment of Curriculum for Excellence Levels over time
Curriculum levels are national levels to describe different stages of learning and progress. For
most children the expectation is:       
Throughout the Broad General Education, children and young people are assessed and decisions
are made by teachers on when a child or young person has achieved learning at a particular level.
This means that they have broadly covered the experiences and achieved the expected outcomes
for that level. In making this decision, the teacher takes into account the evidence mentioned
above, and considers the benchmarks produced by Education Scotland for each level as well as
diagnostic feedback from the National Standardised Assessments (NSAs). Attainment of
Curriculum for Excellence Levels (ACEL) data is collected annually each June by the Scottish
Government. The data collection collects information on pupil performance in four areas, known as
organisers. Organisers consist of Numeracy and the three literacy components; Reading, Writing
and Listening and Talking. A combined literacy measure is also produced based on the three
literacy organisers: reading, writing and listening and talking. The data is collected for pupils at the
key stages of P1, P4,P7 and S3. 
Achievement of Curriculum for Excellence Levels across Bute and Cowal schools: June 2017-
June 2022 
Page 33

Page 34

8 
NOTES:
ER English reading, EW English writing, ELT English Listening and talking N Numeracy
GR Gaelic reading, GW Gaelic writing, GLT Gaelic Listening and talking.
There was no ACEL collection during session 2019/20 due to COVID 
 In English medium by June 2022: 
 In reading, 70.14% of P1 pupils in the BUTE AND COWAL area achieved early
level, this is compared with 75% at authority level and 79% nationally
 In writing, 58.33% of P1 pupils in the BUTE AND COWAL area achieved early
level, this is compared with 68% at authority level and 77% nationally
 In talking and listening, 78% of P1 pupils in the BUTE AND COWAL area achieved
early level, this is compared with 81% at authority level and 86% nationally. 
 In numeracy, 70.14% of P1 pupils in the BUTE AND COWAL area achieved early
level, this is compared with 78% at authority level and 84% nationally. 
 In reading, 64.81% of P4 pupils in the BUTE AND COWAL area achieved first level,
this is compared with 71% at authority level and 76% nationally
 In writing, 56% of P4 pupils in the BUTE AND COWAL area achieved first level,
this is compared with 61% at authority level and 70% nationally
 In talking and listening, 77.16% of P4 pupils in the BUTE AND COWAL area
achieved first level, this is compared with 78% at authority level and 85% nationally. 
 In numeracy, 66% of P4 pupils in the BUTE AND COWAL area achieved first level,
this is compared with 65% at authority level and 75% nationally. 
Page 34

Page 35

9 
 In reading, 63.41% of P7 pupils in the BUTE AND COWAL area achieved second
level, this is compared with 74% at authority level and 79.33% nationally
 In writing, 65% of P7 pupils in the BUTE AND COWAL area achieved second level,
this is compared with 67% at authority level and 73% nationally
 In talking and listening, 80.25% of P7 pupils in the BUTE AND COWAL area
achieved second level, this is compared with 82% at authority level and 86%
nationally. 
 In numeracy, 70.37% of P7 pupils in the BUTE AND COWAL area achieved second
level, this is compared with 65% at authority level and 76% nationally. 
 In Gaelic medium By June 2022: 
 In reading, 100% of P1 pupils in the BUTE AND COWAL area achieved early level,
this is compared with 82% at authority level and 83% nationally
 In writing, 100% of P1 pupils in the BUTE AND COWAL area achieved early level,
this is compared with 79% at authority level and 80% nationally
 In talking and listening, 100% of P1 pupils in the BUTE AND COWAL area achieved
early level, this is compared with 82% at authority level and 84% nationally. 
 In reading, 70% of P4 pupils in the BUTE AND COWAL area achieved first level,
this is compared with 76% at authority level and 71% nationally
 In writing, 60% of P4 pupils in the BUTE AND COWAL area achieved first level,
this is compared with 68% at authority level and 63% nationally
 In talking and listening, 90% of P4 pupils in the BUTE AND COWAL area achieved
first level, this is compared with 76% at authority level and 80% nationally. 
 In reading, 71.43% of P7 pupils in the BUTE AND COWAL area achieved second
level, this is compared with 65% at authority level and 75% nationally
 In writing, 42.86% of P7 pupils in the BUTE AND COWAL area achieved second
level, this is compared with 43% at authority level and 66% nationally
 In talking and listening, 85.71% of P7 pupils in the BUTE AND COWAL area
achieved second level, this is compared with 68% at authority level and 80%
nationally. 
Argyll and Bute Stretch Aims Session 2022-23 (Authority Level)
The Scottish Attainment Challenge (SAC) is about achieving equity in educational outcomes, with
a particular focus on closing the poverty-related attainment gap.  SAC funding is provided to all of
Scotland’s local authorities to help tackle the attainment gap and support education recovery and
improve outcomes for children and young people most impacted by poverty. The Scottish
Attainment Challenge aims to raise the attainment of children and young people living in deprived
areas, in order to close the equity gap.
Attainment Advisors within Education Scotland’s regional improvement teams work with authorities
to identify core attainment measures and specific aims (Stretch Aims) which, informed by local
evidence and data, are identified as local priority areas for improvement. The stretch aims are
intended to be both ambitious and achievable within local contexts and targets are specific to
individual authorities. Progress towards achieving the current stretch aims will be reported on later
in 2023. 
The Stretch Aims are intended to support recovery from the pandemic and accelerate progress in
closing the attainment gap and include:
Page 35

Page 36

10 
 Achievement of Curriculum for Excellence Levels (literacy P1/4/7 combined and
numeracy P1/4/7 combined)
The stretch aims for literacy and numeracy identify the percentage of young people who achieve
their expected Curriculum for Excellence (CfE) level:
 An overall attainment target, which includes all young people 
 An attainment target for young people who live in the most deprived areas (SIMD quintile 1)
 An attainment target for young people who live in the  least deprived areas (SIMD quintile
5)
 A target to reduce the attainment gap between the most and least deprived young people 
The Argyll & Bute literacy and numeracy tables illustrate the progress from the 2021 ‘post
pandemic’ ACEL collection, through the most recent ACEL collection in 2022 (published
December 2022), to the Stretch Aim targets in place for 2023.
The year-on-year trend in ACEL data has been positive; in the two-year period between 2021 and
2022  the overall proportions of primary school pupils achieving the expected levels in literacy had
increased by 3 percentage points, while in numeracy there had been an increase of 4 percentage
points.
The percentage of Quintile 1 (most deprived) young people who achieved their expected CfE level
has increased by 5% in literacy and 10% in numeracy between 2021 and 2022. 
Scottish Attainment Challenge - Stretch Aim 2023: Literacy
In literacy, the attainment gap between young people from the most and least deprived areas of
Argyll & Bute was 33 percentage points in 2021, and by 2022 this narrowed to 27 percentage
points.  Argyll & Bute’s target is to reduce the attainment gap to 21.5 percentage points by 2023.
Literacy                P1/4/7
combined                Dec 22
update
Overall SIMD Q1 SIMD Q5 GAP (Q1-Q5)
ACEL 2021 59% 48% 81% 33pp
2022 ACEL          (published
Dec 22)
62% 53% 80% 27pp
Stretch Aims 2022/23 68.4% 60% 81.5% 21.5pp
Improvement Target (p.p.
2021-2023)
9.4pp 12pp 0.5pp 11.5pp 
Literacy 
P1/4/7 combined Overall SIMD Q1 SIMD Q5 Gap (Q1-Q5)
ACEL June 2021 59% 48% 81% 33pp
Provisional 2022 ACEL data 62.2% 54.8% 79.2% 24.4pp
OCT 22 Projections 62.5% 63.7% 77.8% 14.1%
Feb 23 Projections* 65.7% 68.6% 77.8% 9.2%
Stretch Aim   2022/23         68.4% 60% 81.5% 21.5pp
Improvement Target (p.p.
2021-2023) 9.4pp 12pp 0.5pp 11.5pp
*RAG’d against 2023 Stretch Aim
Page 36

Page 37

11 
In literacy, the attainment gap between young people from the most and least deprived areas of
Argyll & Bute was 33 percentage points in 2021, and by 2022 this narrowed to 27 percentage
points.  Argyll & Bute’s target is to reduce the attainment gap to 21.5 percentage points by 2023. 
Scottish Attainment Challenge - Stretch Aims 2023: Numeracy 
In numeracy, the attainment gap between young people from the most and least deprived areas of
Argyll & Bute was 29 percentage points in 2021, and by 2022 this narrowed to 18 percentage
points.  Argyll & Bute’s target is to reduce the attainment gap to 13.5 percentage points by 2023. 
Numeracy 
P1/4/7 combined
Dec 22 update
Overall SIMD Q1 SIMD Q5 GAP (Q1-Q5)
ACEL 2021 69% 58% 87% 29pp
2022 ACEL            
(published Dec 22)
73% 68% 86% 18pp
Stretch Aims    2022/23 75% 74% 87.5% 13.5pp
Improvement Target  
(p.p. 2021-2023)
6pp 16pp 0.5pp 15.5pp 
Numeracy P1/4/7 Overall SIMD Q1 SIMD Q5 GAP (Q1-Q5)
Current Level (ACEL June
2021) 69% 58% 87% 29pp
Provisional 2022 ACEL data 72% 69% 83.5% 14.4%
OCT 22 Projections 69% 69.6% 84.2% 14.6%
Feb 23 Projections* 71% 72% 83.9% 11.9%
Stretch Aim   2022/23          75% 74% 87.5% 13.5pp
Improvement Target (p.p.
2021-2023)  6pp 16pp 0.5pp 15.5pp
*RAG’d against 2023 Stretch Aim 
The table below outlines the National expectations of when most children and young people may
achieve each level: 
CfE Level  Stage
Page 37

Page 38

12 
Early The final two years of early learning and
childcare before a child goes to school and
P1, or later for some. 
First To the end of P4, but earlier or later for
some. 
Second To the end of P7, but earlier or later for
some. 
Third and fourth S1-S3, but earlier or later for some. 
Further information: 
National Improvement Framework for Scottish Education –
https://www.gov.scot/policies/schools/national-improvement-framework/ 
Initiatives to raise attainment and achievement 
In response to data and evidence gathered in the areas of literacy, numeracy and health and
wellbeing, a range of work has been undertaken in order to drive forward improvement and raise
attainment and achievement across the authority. 
Page 38

Page 39

13 
Literacy
 8 schools have undertaken training in using a Quality Improvement approach to support writing
attainment at 1st level. The training was originally offered by CYPIC and is now being delivered
within the authority, supported by allied health professionals. Data shows that attainment at 1st
level within the first set of schools to undertake the training has increased from an average of
56.2% in 2022 to an average of 72.8% based on Feb 23 predictions. 
 4 schools are undertaking training provided by Talk for Writing to support the development of
sound pedagogical approaches to writing across their settings. The schools have set clear
stretch aims for each class, against which attainment will be evaluated as implementation of
the approach continues. 
 Bespoke support has been offered to schools, covering aspects of literacy such as approaches
to reading comprehension, writing pedagogy, emerging literacy and 1 to 1 reading
interventions. 
Numeracy
 Schools within BUTE AND COWAL and Mull clusters have worked with Dr Lio Moscardini to
develop cognitively guided instruction, an approach to problem solving within schools. As of
March 2023, 73.3% of staff were confident that CGI was having or would have a positive effect
on pupils, 13.3% were extremely confident. Evidence from Head Teachers and practitioners
shows that this approach has had a particular impact on lower ability pupils: by giving pupils
different opportunities to approach their work, practitioners report that it has levelled the playing
field in classrooms.
 Authority-wide, numeracy based CLPL has been delivered to a total of 78 practitioners
representing all cluster areas, focusing primarily on the development of SEAL (stages of early
arithmetical learning) to support foundation skills in mathematical thinking. Support has also
been offered to ASN departments in 2 secondary schools. Numeracy ACEL attainment data
has risen from 69% across P1,4 & 7 in 2021 to a projected 70.95% as of Feb 23. 
Wellbeing , Rights and Relationships
As part of COVID renewal plans, schools have had a continued focus on positive relationships
focussing and the health and well-being of learners.  The Exchange are now providing a
counselling service for pupils aged 10+ within schools, again, this is helping to support the
wellbeing needs of pupils.  A focus on play pedagogy and outdoor learning alongside
developments in the health and wellbeing curriculum have also been an important focus within
school improvement plans to help support wellbeing. 
As it is anticipated that the United Nations Rights of the Child will become law later this year, a
UNCRC Conference for Head Teachers was held in November 2022.  The Rights Respecting
Schools Award continues to support schools in developing awareness of children’s rights across
our school communities as well as imbed a rights based approach within the school environment. 
In the past year, 16 schools have progressed their Rights Respecting Schools Journey.  With 45
Primary schools on their accreditation journey to achieve with UNICEF, 31 have achieved Bronze,
10 Silver, 4 Gold and a further 11 have registered to date.  A further 4 Silver accreditation visits
are due to take place between now and the end of term.  Support sessions for registered schools
(not yet accredited) and information session for schools yet to register are also being delivered.   
Equality and diversity has been a key focus for professional learning for staff. The career long
professional learning sway has provided a range of opportunities for staff to develop their
professional knowledge and reflect on the practice within this area.  As part of the Period Products
(Free Provision) (Scotland) Act 2021, schools have engaged in the My Tribe project which has
Page 39

Page 40

14 
made period products available to pupils and staff across all our schools.  The launch of My Tribe
has been supported by two launch events and online webinars.  The webinar was recorded and
shared with practitioners to ensure that information was accessible post this series of support
events.   
Schools have enjoyed welcoming partners back into school to support the delivery of key aspects
of the curriculum.  The health and wellbeing drama productions that are delivered in partnership
with our colleagues in NHS returned to face to face delivery.  A total of 54 primary schools
attended the Smoke Free Me production that was aimed at P6/P7 pupils.  The performance was
updated to include information and scenarios around vaping.   
Head Teachers have received information with regards to key messages that have been
concluded from the March 2022 PIE Census.  With the updated national data released in
November, we were also able to draw comparisons against the national data.  Developments in
this area have been enhanced with professional learning from Connect who support the
partnership between parents/carers, parent councils and schools.  Schools and parent councils
are responding to the needs of their community in how they are structuring events and meetings
with many Parent Council meetings continuing to take place virtually, increasing accessibility and
reducing travel requirements.  The partnership working is also helping school communities
respond to financial and environmental pressures with examples of good practice including
Christmas jumper/dress swaps. 
School Contacts 
Page 40

Page 41

15 
School  Head Teacher  Telephone No  
Dunoon  Brenda Reid  01369 704159 
Innellan  Lisa Marle  01369 830560 
Kilmodan  Selina Portwine  01369 820280 
Kirn  Kirsteen MacDonald  01369 702509 
Lochgoilhead  Louise Blair  01301 703338 
North Bute  Marie Law from 26th May 2023  01700 503728 
Rothesay Joint Campus  Louise Nicol  01700 503227
Sandbank
Gaelic Medium  Norman MacDonald (Acting)  01369 706350 
Sandbank  Norman MacDonald (Acting)  01369 706350 
St Andrew’s  Louise Nicol (Temporary)  01700 503123 
St Mun’s Lorraine Fisher (Acting)  01369 703643 
Strachur  Marion Boyd  01369 860293 
Strone Dan Semple(Leadership of school)  01369 840242 
Tighnabruaich  Megan Stirling  01700 811413 
Toward  Lisa Marle  01369 870259 
Page 41

Page 42

16 
Page 42

Page 43

ARGYLL AND BUTE COUNCIL SECONDARY SCHOOL ATTAINMENT REPORT
AREA COMMITTEE 
DUNOON GRAMMAR SCHOOL 
JUNE 2023 
Page 43
Agenda Item
6a

Page 44

School Name  Dunoon Grammar School 
School Address  Ardenslate Road, Dunoon, PA23 8LU
Head Teacher  David Mitchell 
CONTEXT OF THE SCHOOL 
Dunoon Grammar School has a very long and distinguished history spanning over 350 years of growth, of which high standards of academic
and personal development have been the hallmarks. 
Dunoon Grammar School is a mixed sex, interdenominational school which caters for pupils aged from eleven to eighteen years of age and
serves the area of Cowal. Catchment is rural in nature and includes two large primary schools in Dunoon and 9 other primary schools. 
There are 742 pupils on the school roll. The teaching staff compliment is 58.2FTE. The Senior Leadership Team comprises of the Head
Teacher and four Depute Head Teachers. There are 8 Principal Teacher Curriculum and 4 Heads of House (Guidance). 
In our school we are committed to providing appropriate learning opportunities for the young people, both in and out with school, and to secure
positive destinations for all of our students. This is done in partnership with parents/carers and takes into account the needs of our young
people. 
Our SIMD ranges from SIMD1 to SIMD 6. 
The pupil equity funding for session 2022-23 was £80,000. We have used this money to build on the excellent work that we started in our
wellbeing hub. Our wellbeing officer has introduced a structured mental health strategy working with See me, we have employed a youth
worker, a life coach and introduced a number of Principal Teacher posts to support improvement and to close the attainment gap. These
Principal teachers include, PT DYW, PT Learning and Teaching and PT Raising attainment.   
Page 44

Page 45

S3 ACEL Attainment in Literacy and Numeracy   
School Level % Achieved
Reading Writing L&T Literacy Numeracy
Dunoon Grammar School Third Level or better 77.8 71.9 76.3  68.1 89.6
Argyll & Bute Third Level or better 88.3 87.0 88.2 83.9 87.8
Dunoon Grammar School Fourth Level 26.7 25.9 30.4 25.9 58.5
Argyll & Bute Fourth Level 49.8 47.6 51.5 45.9 57.6 
S3 ACEL – Gaelic (if relevant) 
School Level
% Achieved
Gaelic
Reading
Gaelic
Writing
Gaelic
L&T   
Dunoon Grammar School Third Level or better 80 80 80   
Dunoon Grammar School  Fourth Level 20 20 20   
Page 45

Page 46

Evaluative Comment – Areas of Strength in BGE Attainment:
Our Numeracy results at 3rd and 4th level are consistency above the Argyll and Bute Average. 
Evaluative Comment – Areas for Development in BGE Attainment:
Reading, writing, listening and talking and literacy are all considerably lower than the A&B average.  In extensive discussion with the English department, this
is a result of lack of staff understanding and awareness of 3rd and 4th level leading to a lack of professional confidence in selecting an appropriate level
achieved.  The English department has taken steps to rectify this for next session - namely the implementation of moderation sessions and clearer course
plans that allow for more appropriate assessment opportunities. 
Gaelic comments 
Our Gaelic department continues to thrive with 80% of the cohort achieving level 3. 
Page 46

Page 47

National Qualifications – Pass rates 
NATIONAL
QUALIFICATIONS
2021-22
A-C 
Number of
Presentations 
Number 
Attaining A-C
% Attaining A-
C
Argyll and
Bute %
Attaining A-C
National %
Attaining A-C
Advanced Higher 45 33 73% 85.50% 82.60%
Higher 314 246 78% 80.90% 80.30%
National 5 700 555 79.3% 79.70% 81.60% 
Level/Stage           
2022 A B C D No Award  Grade A-B  Grade A-C  Grade A-D
National 5  (Nat. 41.20%
A&B 35.40%)
(Nat. 23.00%
A&B 25.57%)
(Nat. 17.43%
A&B 18.69%)
(Nat. 10.79%
A&B 12.73%)
(Nat. 7.60%
A&B 7.60%)
(Nat. 64.20%
A&B 61%) 
(Nat. 81.60%
A&B 79.70%)
(Nat. 92.4%
A&B 92.4%)
National 5 39.14% 21.71% 16.43% 12.86% 7.86% 60.86% 77.29% 90.14%
S4 42.71% 23.44% 16.32% 10.24% 4.86% 66.15% 82.47% 92.71%
S5 18.48% 13.04% 18.48% 29.35% 20.65% 31.52% 50.00% 79.35%
S6 34.38% 15.63% 12.50% 12.50% 25.00% 50.00% 62.50% 75.00%
Higher
(Nat. 36.50%
A&B 35.60%)
(Nat. 24.32%
A&B 24.56%)
(Nat. 19.49%
A&B 20.8%)
(Nat. 11.74%
A&B 12.61%)
(Nat. 7.90%
A&B 6.50%)
(Nat.60.90%
(A&B 60.00%)
(Nat. 80.3%
A&B 80.90%)
(Nat 92.10%
A&B 93.50%)
Higher 28.66% 24.20% 25.48% 13.38% 8.28% 52.87% 78.34% 91.72%
S5 34.30% 24.64% 22.71% 11.11% 7.25% 58.94% 81.64% 92.75%
S6 17.76% 23.36% 30.84% 17.76% 10.28% 41.12% 71.96% 89.72%
Page 47

Page 48

Advanced Higher  (Nat 35.00%
A&B 30.80%)
(Nat. 26.28%
A&B 26.09%)
(Nat. 21.35%
A&B 28.99%)
(Nat. 11.27%
A&B 11.59%)
(Nat. 6.20%
A&B 3.20%)
(Nat 61.2%
A&B 56.7%)
Nat. 82.60%
A&B 85.50%)
(Nat. 93.80%
A&B 96.8%)
Advanced Higher  20.00% 28.89% 24.44% 26.67% 0.00% 48.89% 73.33% 100.00%
S5 100.00% 0.00% 0.00% 0.00% 0.00% 100.00% 100.00% 100.00%
S6 18.18% 29.55% 25.00% 27.27% 0.00% 47.73% 72.73% 100.00% 
Evaluative Comment – Areas of Strength 
Our S4 attainment at National 5 level continues to be strong. We are above the National average and Argyll and Bute average for A and B passes, We also
have a lower percentage of S4 pupils getting a No Award than the National average and the Argyll and Bute average. 
Our S5 attainment at Higher level A-C passes is Higher than Argyll and Bute and the National average
The A-D pass rate at Advanced Higher is 100% 
Evaluative Comment – Areas for Development 
Our National 5 performance in S5 and S6 needs to improve, Our school has been looking at appropriate pathways and alternative courses to ensure our
young people are courses at the relevant level. Departments have been investigating possible alternatives using the SCQF framework. 
Our S5 and S6 performance at Higher level requires further development. 
Our A-C pass rate performance at Advanced Higher requires further development 
Page 48

Page 49

Insight Dashboard 
What is Insight Scotland?
Insight is a professional tool, aimed at teachers and other staff. It is used to help secondary schools and local authorities identify areas of success and where
improvements can be made for pupils in the senior phase. The dashboard has 4 measures. 
Page 49

Page 50

Improving attainment in literacy and numeracy 
Evaluative Comment – Areas of Strength 
During session 2022-23 our overall performance in Literacy and Numeracy has improved from last year. We are now above our virtual comparator for those
leavers achieving a Level 5 Literacy and Numeracy. 
The Maths and English department have developed appropriate packages of support to ensure our young people achieve at least a level 4 Literacy and
Numeracy qualification before their point of exit. 
Evaluative Comment – Areas for Development
We are just below our virtual comparator at level 4 Literacy and Numeracy although we have improved from session 2021. Further development is required to
ensure improvement in our Literacy data. We have now implemented earlier banking of literacy and numeracy awards (start of S3) and more holistic tracking
and monitoring of each pupil’s achieved level of literacy and numeracy.  We have also incorporated an ‘upgrade’ opportunity to ensure that pupils’ achieved
level is maximised. 
Page 50

Page 51

Increased post-school participation 
Evaluative Comment – Areas of Strength 
A great of interventions have been introduced to ensure our young people move onto a positive and sustained destination. The previous 4 years we were
below our measures. However, this session our leavers data is better than our virtual comparator, Argyll and Bute, The Northern Alliance and the National
establishment. We have educated our young people on different routes to employment, further and Higher Education. The appointment of a PT DYW has
supported improvement. 
Evaluative Comment – Areas for Development 
Continued work on Foundation apprenticeships is required within our school 
Page 51

Page 52

Improving attainment for all 
Evaluative Comment – Areas of Strength 
Our lowest 20% of learners have performed well. Their total tariff point in better than our virtual comparator, Argyll and Bute, The Northern
Alliance and the National Establishment 
Our Middle 60% of learners have performed well. The have performed better than Argyll and Bute, The Northern Alliance and the National
establishment. 
Evaluative Comment – Areas for Development 
Our Middle 60% of learners did not perform as well as our Virtual comparator
Our Highest 20% of learners performed lower than our virtual comparator, Argyll and Bute council, The Northern Alliance and the National
establishment. Further development is required for our more able pupils.   
Page 52

Page 53

Attainment versus Deprivation 
Evaluative Comment – Areas of Strength 
Young people in SIMD 2-6 performed better than the National trend 
Evaluative Comment – Areas for Development 
Young people in SIMD 1 and SIMD 9 performed lower than the National Trend. Work is ongoing to support our more able pupils and to ensure
appropriate courses are available for our young people to study. 
Page 53

Page 54

Wider Achievement Qualifications 
National Certificates; Higher National Certificates; Scottish Vocational Qualifications;  National Progression Awards;
Skills for Work qualifications; Foundation Apprenticeships; Scottish Baccalaureate
Overall evaluative comment/narrative on Wider Achievement Qualifications in your school: 
Dunoon Grammar School recognises the need to celebrate wider achievement both within school and out with school.   
A member of teaching staff has been allocated the task of tracking the achievements of our young people. These achievements
are celebrated in a number a number of ways. Termly, achievement assemblies are held for each year group, the Head Teacher
regularly sends out praise letters to our young people and we have House notices boards that highlight achievements. 
Our Business and Computing department have developed a large number of enterprising opportunities for our young people
including, Apps for Good, YPI and the tenner challenge. The pupils thrive on these opportunities and have won a number of
awards. 
NPA – Computer games Development – 9 young people 
NPA Drama – 2 young people 
S4 Construction Craft Skills – 11 young people – 8 young people passed 
Hairdressing National 4 and National 5 – 23 young people 
Maritime National 5 – 5 young people – 1 pass
Early Education and Childcare National 4 – 10 passed 
NPA Beauty Skills – 8 passed 
NPA make up skills – 5 passed 
Higher Beauty – 5 passed 
Higher Psychology 
Higher Sociology 
Subject departments are now looking at alternative level 5 and level 6 qualifications. Time has been allocated at collegiate and
staff development days. SCQF lead Donnie Woods will be attending In-service day in November. Time has bene allocated for
principal Teachers to meet with him and he will give a presentation to all staff. 
We are introducing a new course called e-sports. This is being developed in partnership with SQA and will be at level 5 in the first
instance. 
Page 54

Page 55

SCHOOL/COLLEGE
PARTNERSHIP
NATIONAL
QUALIFICATIONS
2021-22
A-C (including Passes) 
Number of
Presentations 
Number 
Attaining A-C % Attaining A-C
% of those
commencing
college course
completing
course
Higher 15 9 60% 92%
National 5 15 11 73%
National 4 29 23 79%
SCHOOL/COLLEGE
PARTNERSHIP
NATIONAL
QUALIFICATIONS
2021-22
A-D (including Passes) 
Number of
Presentations 
Number 
Attaining A-D % Attaining A-D
% of those
commencing
course
completing
course
Higher 15 10 67% 92%
National 5 15 11 73%
National 4 29 23 79% 
Page 55

Page 56

Equity and Attainment – Evaluation of Key Factors 
Factor in attainment 
Attendance School Ave. Att. 21-22:  88.48% 
Exclusion No. of Exclusion Incidents 21-22:  40%
No. of Exclusion Openings 21-22:  89%
Additional
Support Needs
354 young people have been classed with an additional Support Needs – 47% 
SIMD
Our SIMD profile ranges from SIMD 1-SIMD 7
Free School
Meal
Entitlement
Number of pupils 148    -  19.73% of cohort
Care
Experienced
(and previously
Care
Experienced)
28 young people – 4% of cohort
Young people’s attainment is being tracked by the DHT support. Interventions
have been put in place like in-school supporters
English as
Additional
Language
Young people’s attainment is being tracked by the DHT support. Interventions
have been put in place like in-school supporters 
We have allocated a member of our support staff to lead and support young
people with English as an additional Language. Young people meet with the
teacher in small groups and in one to one situation. 
Other (give
details) 
Page 56

Page 57

Pupil Equity Funding 
We have used our Pupil Equity Funding to fund the following: 
 Wellbeing Officer 
 PT Learning and Teaching
 PT DYW 
 PT raising attainment
 A youth worker 
 A life Coach 
 Live “n” learn inputs 
 Individual support for young people with examination preparation 
Page 57

Page 58

Other information 
Dunoon Grammar School has had a positive and productive year. The school continues to develop confidence in our young people and ensure
and develop them both academically and socially. 
The school continues to be recognised at local, National and International Level. 
 The school won the Scottish Education Award for Gaelic Education 
 Our Gaelic Teacher Rachel Kellow won the Young Gaelic Ambassador at the National Gaelic awards
 Dunoon Grammar School was named as the “World’s Best School for Community collaboration” 
 We continue to work with our community partners on a number of projects 
- Dunoon Burgh Hall 
- Dunoon Film festival 
- Our Local primary schools 
- Dunoon Museum 
- Historic Kilmun 
- Learning Centre activities
- The Dunoon Project
 We continue to work with our National partners, The Wood Foundation and Apps for Good
 We continue to offer a wide range of Extra Curricular activities and school trips
 A group of our young people took part in a trip to Tanzania this session 
 The Gaelic Department has been nominated and short listed for the Scottish Education Award for a 2nd year 
 Our Head Teacher has been nominated and short listed for the Head Teacher of the Year at the Scottish Education awards 
Page 58

Page 59

ARGYLL AND BUTE COUNCIL SECONDARY SCHOOL ATTAINMENT REPORT
AREA COMMITTEE 
SCHOOL BADGE       
NAME OF SCHOOL: Rothesay Academy 
DATE OF REPORT: June 2023 
Page 59
Agenda Item
6b

Page 60

School name: Rothesay Joint Campus
School Address: High Street, Townhead, ROTHESAY, PA20 9JH
Head Teacher: Louise C Nicol 
Context of the school 
Rothesay Joint Campus is a fully comprehensive, non-denominational 3-18 learning establishment which serves the local communities on the Isle of Bute.
The campus, which is located in the town of Rothesay, was opened in 2007 and is made up of Rothesay Pre 5 Early Years Unit, Rothesay Primary School and
Rothesay Academy.  Other primary schools in the cluster who feed into Rothesay Academy are North Bute Primary School and St Andrew’s (RC) Primary
School.  There are 598 children across the campus (290 in secondary). 
We have a teaching staff compliment of 25.6FTE.  The Senior Leadership Team comprises of The Head Teacher, two Depute Head Teachers, four Principal
Teachers of Curriculum, 2 Principal Teachers of Guidance and a Principal Teacher of Support (3-18) 
Our pupil equity fund spending for session 2022-23 was £34 000.  We use this money to support our most vulnerable children and their families. 
Our SIMD profile is as follows: SIMD 1-3 = 67.1%, SIMD 5 = 19.7%, SIMD 7 = 5.3%, SIMD 9 = 7.9% 
In recent years we have played a major role in the resettlement of Syrian refugee families as well as a small number of Ukrainian and Sudanese refugee
families.  This has been a very successful and rewarding initiative for our school community. 
Page 60

Page 61

S3 ACEL Attainment in Literacy and Numeracy   
School Level % Achieved
Reading Writing L&T Literacy Numeracy 
Third Level or better 88.2 82.4 82.4 74.5 94.2
Argyll & Bute Third Level or better 88.3 87.0 88.2 83.9 87.8 
Fourth Level 64.7 49.0 70.6 47.1 48.1
Argyll & Bute Fourth Level 49.8 47.6 51.5 45.9 57.6 
S3 ACEL – Gaelic (if relevant) 
School Level
% Achieved
Gaelic
Reading
Gaelic
Writing
Gaelic
L&T   
Third Level or better     
Fourth Level     
Page 61

Page 62

Evaluative Comment – Areas of Strength in BGE Attainment: 
Numeracy – level 3 above authority average
Literacy – level 4 above authority average
Reading, Writing, Talking & Listening – all above authority average at level 4
Reading in line with authority average 
Evaluative Comment – Areas for Development in BGE Attainment: 
Level 4 Numeracy below authority average – 
 Review of learning & teaching approaches 
 SEAL Training (Recovery programme)
 Work with primary to exemplify and moderate level 3
Level 3 Writing & Literacy
 focus on literacy homework which targets writing skills
 Focussed literacy period in S1 & S2
 Working with primaries on challenging level 3 learners in P6/7
 Moderation
 Tracking & monitoring       
Page 62

Page 63

National Qualifications – Pass rates 
NATIONAL
QUALIFICATIONS
2021-22
A-C 
Number of
Presentations 
Number 
Attaining A-C
% Attaining A-
C
Argyll and
Bute %
Attaining A-C
National %
Attaining A-C
Advanced Higher 19 14 73.7 85.50% 82.60%
Higher 103 73 70.9 80.90% 80.30%
National 5 272 211 77.6 79.70% 81.60% 
Level/Stage           
2022 A B C D No Award  Grade A-B  Grade A-C  Grade A-D
National 5  (Nat. 41.20%
A&B 35.40%)
RA 26.47%
(Nat. 23.00%
A&B 25.57%)
RA 27.21%
(Nat. 17.43%
A&B 18.69%)
RA 23.90%
(Nat. 10.79%
A&B 12.73%)
RA 13.97%
(Nat. 7.60%
A&B 7.60%)
RA 8.46%
(Nat. 64.20%
A&B 61%)
RA 53.68% 
(Nat. 81.60%
A&B 79.70%)
RA 77.57%
(Nat. 92.4%
A&B 92.4%)
RA 91.54%
S4 29.78% 29.33% 23.56% 12.89% 4.44% 59.11% 82.67% 95.56%
S5 13.16% 29.33% 28.95% 21.05% 18.42% 31.58% 60.53% 81.58%
S6 0.00% 11.11% 11.11% 11.11% 66.67% 11.11% 22.22% 33.33%
Higher 
(Nat. 36.50%
A&B 35.60%)
RA 17.48%
(Nat. 24.32%
A&B 24.56%)
RA 23.30%
(Nat. 19.49%
A&B 20.8%)
RA 30.10%
(Nat. 11.74%
A&B 12.61%)
RA 20.39%
(Nat. 7.90%
A&B 6.50%)
RA 8.74%
(Nat.60.90%
(A&B 60.00%)
RA 40.78%
(Nat. 80.3%
A&B 80.90%)
RA 70.87%
(Nat 92.10%
A&B 93.50%)
RA 91.26%
S4 33.33% 33.33% 33.33% 0.00% 0.00% 66.66% 100% 100%
S5 18.92% 22.97% 28.38% 18.92% 10.81% 41.89% 70.27% 89.19%
S6 11.54% 26.92% 30.77% 26.92% 3.85% 38.46% 69.23% 96.15%
Advanced Higher
(Nat 35.00%
A&B 30.80%)
(Nat. 26.28%
A&B 26.09%)
(Nat. 21.35%
A&B 28.99%)
(Nat. 11.27%
A&B 11.59%) 
(Nat. 6.20% 
A&B 3.20%)
(Nat 61.2%
A&B 56.7%)
Nat. 82.60%
A&B 85.50%)
(Nat. 93.80%
A&B 96.8%)
Page 63

Page 64

RA 5.26% RA 21.05%  RA 47.37% RA 21.05% RA 5.26% RA 26.32% RA 73.68% RA 94.74%
S5        
S6 5.26% 21.05% 47.37% 21.05% 5.26% 26.32% 73.68% 94.74% 
Evaluative Comment – Areas of Strength 
We have a positive presentation policy which encourages staff to present as many learners as possible for examinations.
Our A-D pass rates at National 5 and Higher are very close to the Argyll & Bute and National pass rates. 
We have achieved some success at Higher level in S4 and we are continuing to build on this
We are above the National average for A-D pass rates at Advanced Higher 
Evaluative Comment – Areas for Development 
Our National 5 performance in S5 and S6 needs to improve.  Our re-alignment of our curriculum and our constantly evolving curriculum offer will target
learners who struggle to engage.
Our Higher performance in S5 requires further development
Our Advanced Higher performance requires further development 
Page 64

Page 65

Insight Dashboard 
What is Insight Scotland?
Insight is a professional tool, aimed at teachers and other staff. It is used to help secondary schools and local authorities identify areas of success and where
improvements can be made for pupils in the senior phase. The dashboard has 4 measures. 
Page 65

Page 66

Improving attainment in literacy and numeracy 
Evaluative Comment – Areas of Strength 
Overall performance at level 4 has improved and is now above the virtual comparator
Maths & English departments have developed targeted approaches to support young people to achieve at least level 4 in literacy and numeracy. 
Evaluative Comment – Areas for Development 
Attainment in numeracy at level 5 is below the virtual comparator and our Maths department are working with primary colleagues, the local authority and
Education Scotland to develop a numeracy strategy that improves numeracy skills from primary to Senior Phase. 
Page 66

Page 67

Increased post-school participation 
Evaluative Comment – Areas of Strength 
In line with VC and is historically an area of strength
Continued successful use of Flexible Learning Plans to support young people into workplace 
Evaluative Comment – Areas for Development 
Continue to build relationships with local employers and to widen curriculum pathways. 
Page 67

Page 68

Improving attainment for all 
Evaluative Comment – Areas of Strength 
Lowest 20% of learners have performed well with total tariff points being above the virtual comparator
The gap is closing with the virtual comparator for the highest 20% compared with previous years.  This reflects our focus on challenging more
able students, particularly in S6, who now engage in a wider options offering which includes Open University YAS courses college Higher
courses and an enhanced Advanced Higher offering in conjunction with other schools in the authority. 
Evaluative Comment – Areas for Development 
Middle 60% of learners is our target area.  We are focussing on widening our offer to engage learners through outdoor learning, wider
achievement awards, college courses and more bespoke coursing. 
We have also re-aligned our timetable to ensure that there is sufficient time allocated to mentoring, numeracy and study skills in order to support
learners in areas such as motivation, organisation, self-regulation, target setting and attendance.
Page 68

Page 69

Attainment versus Deprivation 
Evaluative Comment – Areas of Strength 
Learners in SIMD are generally in line with the national average
Learners in SIMD 9 are above the national average 
Evaluative Comment – Areas for Development 
Learners in SIMD 5 are below the national average
We are targeting the following areas to improve: enhanced coursing, curriculum changes and more rigorous attendance monitoring 
Page 69

Page 70

Wider Achievement Qualifications 
National Certificates; Higher National Certificates; Scottish Vocational Qualifications;  National Progression Awards;
Skills for Work qualifications; Foundation Apprenticeships; Scottish Baccalaureate
Overall evaluative comment/narrative on Wider Achievement Qualifications in your school: 
NPA Beauty (level 4) – 7
NPA Computer Games Development (Level 6) – 1
Wellbeing Level 4 – 18  Level 5 – 32
NPA Photography – level 4 – 2     Level 5 – 5
Practical Cookery N5 – 6
Personal Finance – level 4 – 3    level 5 – 6
Leadership – Level 5 – 5
Travel & Tourism – Level 5 – 7
YAS Award Level 7 – Law – 1  Social Sciences - 1 
We are offering a growing number of awards to our young people to ensure that they have meaningful pathways that promotes
learner engagement.  We are looking to develop and increase the number of courses/awards that are available, particularly at
Level 6. 
Duke of Edinburgh Bronze Award – 11 
We have been chosen by Education Scotland to pilot their new course and award in Screen Education.  Work is being done to
prepare for the introduction of this course next session. 
Page 70

Page 71

SCHOOL/COLLEGE PARTNERSHIP NATIONAL QUALIFICATIONS 
SCHOOL/COLLEGE
PARTNERSHIP
NATIONAL
QUALIFICATIONS
2021-22
A-C (including Passes) 
Number of
Presentations 
Number 
Attaining A-C
% Attaining A-
C
% of those
commencing
college course
completing
course
Higher 8 5  
National 5   
National 4   
SCHOOL/COLLEGE
PARTNERSHIP
NATIONAL
QUALIFICATIONS
2021-22
A-D (including Passes) 
Number of
Presentations 
Number 
Attaining A-D
% Attaining A-
D
% of those
commencing
course
completing
course
Higher 8 7  
National 5   
National 4   
Page 71

Page 72

UNGRADED COURSES
Numbers Achieving
SCQF 4 SCQF 5 NPA Other Awards
(please detail)
Early Education &
Childcare 
14  
Sport & Recreation  10  
Travel & Tourism (school)     
Page 72

Page 73

Equity and Attainment – Evaluation of Key Factors 
Factor in attainment 
Attendance School Ave. Att. 21-22:  86.10% 
Exclusion No. of Exclusion Incidents 21-22:  7
No. of Exclusion Openings 21-22:  30
Additional
Support Needs
95 of our learners have an additional support need – 33.5% 
SIMD
SIMD 1-3 = 67.1%, SIMD 5 = 19.7%, SIMD 7 = 5.3%, SIMD 9 = 7.9% 
Free School
Meal
Entitlement  24%
Care
Experienced
(and previously
Care
Experienced)
12 young people = 4.2%
English as
Additional
Language
8 children = 2.8%
We have 1 x 0.4FTE EAL Teacher and 3 x EAL Assistants
Other (give
details) 
Page 73

Page 74

Pupil Equity Funding 
We have used PEF Equity funding to fund the following: 
Principal Teacher of Equity 
O.2FTE Health & Wellbeing, Family Liaison Officer 
Breakfast Club 
Study Skills & Homework supplies 
Seasons for Growth (Bereavement Support) 
Fresh Start Reading (Literacy Support) 
Page 74

Page 75

Other information 
We are continuing to make progress towards Our Children Their Nurturing Education (OCTNE) Gold Award and our Rights Respecting School
Silver Award.  We have also achieved our SCQF Bronze Award in light of the work we have done to broaden out our pathways. 
 We continue to work with our Community Partners: 
Mountstuart & The Yard            
Bute Produce            
Bute Sailing Club            
Bute Community Forrest            
The local farming community            
Police Scotland            
Young Carers            
Inverclyde Athletics Club 
 We have been selected by Education Scotland as one of only four schools in Scotland to pilot the Screen Education Curriculum &
Award.  We are looking forward to embracing the opportunities that this will bring to enable our young people to develop their skills and
knowledge of a cutting edge industry within Scotland and beyond. 
 We continue to work with our National Partners: The Wood Foundation, Scottish Mental Health Association (SAMH) & Quality Meat
Scotland. 
 We have a school trip to Belgium planned for June 2023 and we hope to build on this to re-establish trips abroad now that we have
entered the post-covid era. 
 Our Scottish Evening was a massive success and brought together our community to celebrate all things Scottish on 25th January
(Burns Day) 
Page 75

Page 76

Page 76

Page 77

1 
ARGYLL AND BUTE COUNCIL BUTE AND COWAL AREA
COMMITTEE 
CUSTOMER SUPPORT SERVICES   6 JUNE 2023 
AREA PERFORMANCE REPORT – FQ4 2022/23 
1 Background 
1.1 This paper presents the Area Performance Report for Financial Quarter 4 2022/23
(January to March 2023) and illustrates the agreed performance measures.
1.2 The features of the Performance Report are as follows:- 
 Indicators are grouped by Corporate Outcome.
 The data table for each indicator is colour coded to identify the level of
reporting.
o Area level measures are blue
o Council level measures are grey
o COI measures are white 
 Each indicator details the
o Target, Actual and Performance status (Green / Red / No Target) for the
current and three previous financial quarters.
o Commentary for the current financial quarter only.
o Narrative explaining the performance trend e.g. This indicator is above
Target and performance has improved since the last reporting period.
o Where appropriate a Performance Trend Line has been added.
o The name of the responsible officer.
o Where possible performance is presented at both Area and Council
level. 
1.3 The commentary for each indicator helps ‘Tell Our Story’ and enables Elected
Members to put the performance data into perspective and understand if an issue is
local in nature or should be escalated up to a Strategic Committee. 
1.4 To improve the response to performance queries, it is requested that either the
Responsible Named Officer or Sonya Thomas are contacted once the Quarterly
Performance Report is received with any queries. This should enable some
queries being resolved or clarified prior to the Area Committee meeting, and
therefore being carried forward as Actions at a subsequent meeting. 
2 Recommendations 
2.1 It is recommended that the Area Committee – 
a) Notes and considers the performance and supporting commentary as
presented. 
Page 77 Agenda Item 7

Page 78

2 
b) Upon receipt of the Quarterly Performance Report the Area Committee
contact either the Responsible Named Officer or Sonya Thomas with any
queries. 
c) Note that work is ongoing and to respond to Sonya Thomas with requests
or comments regarding the layout and format of the Performance Report. 
3.0 IMPLICATIONS 
3.1 Policy: None
3.2 Financial: None
3.3 Legal: None
3.4 HR: None
3.5 Fairer Scotland Duty: No impact assessment required for this report. 
3.5.1 Equalities: None. If requested the Area Committee Performance Report
can be supplied in a different format.
3.5.2 Socio-economic Duty: None
3.5.3 Islands: None 
3.6 Climate Change: None
3.7 Risk: None
3.8 Customer Service: None 
Kirsty Flanagan, Executive Director with responsibility for Customer Support
Services 
Jane Fowler
Head of Customer Support Services
4 May 2023 
For further information, please contact:
Sonya Thomas
Organisation Development Officer - Performance and Improvement
Customer Support Services
01546 604454 
Appendix 1: FQ4 2022/23 B&C Performance Report 
Page 78

Page 79

Appendix 1
Page 1 
Performance Reporting
Performance Reporting .............................................................................................................................................................................................................................. 1
All Areas .................................................................................................................................................................................................................................................. 4
Corporate Outcome No.1 – People live active, healthier and independent lives ............................................................................................................................ 5
COI – Maximise distribution of Scottish Welfare Fund ................................................................................................................................................................. 5
Corporate Outcome No.1 – People live active, healthier and independent lives ............................................................................................................................ 6
COI – Percentage of clients satisfied that they are better able to deal with their financial problems following our support and intervention ...................... 6
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................... 7
Number of parking penalty notices issued – Bute and Cowal ...................................................................................................................................................... 7
Number of parking penalty notices issued – Argyll and Bute ....................................................................................................................................................... 7
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................... 8
Car parking income to date – Bute and Cowal............................................................................................................................................................................... 8
Car parking income to date – Argyll and Bute ............................................................................................................................................................................... 9
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................. 10
Dog fouling – total number of complaints – Bute and Cowal ..................................................................................................................................................... 10
Dog fouling – total number of complaints – Argyll and Bute ...................................................................................................................................................... 10
Corporate Outcome No.3 – Children and young people have the best possible start ................................................................................................................... 11
COI – Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring plans in place .... 11
Corporate Outcome No.3 – Children and young people have the best possible start ................................................................................................................... 12
COI – Provide quality meals with cost margins to all pupils ....................................................................................................................................................... 12
Corporate Outcome No.4 – Education, skills and training maximises opportunities for all .......................................................................................................... 13
Maximise the percentage of 16-19 years olds participating in education, training or employment – Bute and Cowal .......................................................... 13
Maintain the percentage of 16-19 years olds in Argyll and Bute participating in education, training or employment services – Argyll and Bute ................ 13
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 14
Number of affordable social sector new builds completed per annum – Bute and Cowal ....................................................................................................... 14
Page 79

Page 80

Appendix 1
Page 2 
Number of affordable social sector new builds completed per annum – Argyll and Bute ........................................................................................................ 14
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 15
Percentage of pre-planning application enquiries processed within 20 working days – Bute and Cowal ................................................................................ 15
Percentage of pre-planning application enquiries processed within 20 working days – Argyll and Bute ................................................................................ 15
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 16
Householder planning applications – average number of weeks to determine – Bute and Cowal ........................................................................................... 16
Householder planning applications – average number of weeks to determine – Argyll and Bute ........................................................................................... 16
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 18
COI – The number of new homeless applicants who required temporary accommodation this period .................................................................................. 18
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 19
COI – Maintain the percentage of local suppliers that benefit from the awards of contracts via the procurement portal .................................................... 19
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 20
COI – Increase the number of community benefits that are delivered through contracts we award locally ........................................................................... 20
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 21
Street lighting – percentage of faults repaired within 10 days – Bute and Cowal ..................................................................................................................... 21
The percentage of street lighting faults are completed within 10 working days – Argyll and Bute .......................................................................................... 21
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 22
Total number of complaints regarding waste collection – Bute ................................................................................................................................................. 22
Total number of complaints regarding waste collection – Cowal ............................................................................................................................................... 22
Total number of complaints regarding waste collection – Argyll and Bute ............................................................................................................................... 23
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 24
COI – Percentage of waste recycled, composted and recovered ................................................................................................................................................ 24
Renewi (formerly Shanks) – Percentage of waste recycled, composted and recovered ........................................................................................................... 24
Islands – Percentage of waste recycled, composted and recovered .......................................................................................................................................... 25
H&L – Percentage of waste recycled, composted and recovered ............................................................................................................................................... 26
Page 80

Page 81

Appendix 1
Page 3 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 27
COI – The number of tonnes of waste sent to landfill ................................................................................................................................................................. 27
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 28
LEAMS (Local Environment Audit and Management System) – Bute ......................................................................................................................................... 28
LEAMS (Local Environment Audit and Management System) – Cowal ...................................................................................................................................... 28
LEAMS (Local Environment Audit and Management System) – Argyll and Bute ....................................................................................................................... 29
Making It Happen.............................................................................................................................................................................................................................. 30
Teacher sickness absence – Bute and Cowal ............................................................................................................................................................................... 30
Teacher sickness absence – Argyll and Bute ................................................................................................................................................................................ 30
Making It Happen.............................................................................................................................................................................................................................. 31
LGE staff (non-teacher) sickness absence – Bute and Cowal ...................................................................................................................................................... 31
LGE staff (non-teacher) sickness absence – Argyll and Bute ....................................................................................................................................................... 31
Making It Happen.............................................................................................................................................................................................................................. 32
COI – Increase the percentage of all self-service automated contacts ....................................................................................................................................... 32 
Page 81

Page 82

Appendix 1
Page 4 
All Areas 
FQ4 2022/23 Overall Performance Summary 
The information presented is a summary of the agreed measures. 
Unless stated otherwise, performance is presented at both Area and Council-wide levels. 
The measures show the performance against target for the current and previous three reporting periods with an explanation of performance trend. 
The data table for each indicator is colour coded to identify the level of reporting: 
 Area level measures are blue.
 Council level measures are grey.
 Corporate Outcome Indicators (COIs) are white. 
Where appropriate a Trend Line has been added to illustrate movement in ‘Actual’ over the reporting period.  Page 82

Page 83

Appendix 1
Page 5 
Corporate Outcome No.1 – People live active, healthier and independent lives 
COI – Maximise distribution of Scottish Welfare Fund 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ1 2022/23 95.3% 87.5% Red
FQ2 2022/23 95.3% 115.1% Green
FQ3 2022/23 95.3% 129.2% Green
FQ4 2022/23 95.3% 144.0% Green 
Performance in FQ4 has exceeded target and actual has increased since the last reporting period. 
FQ4 Comment 
At 31 March 2023 our total Scottish Welfare Fund (SWF) spend is £659,812.  Our 2022/23 allocation was £458,338 so this represents an overspend of £201,474.  
However the Council has earmarked reserves from the previous years’ Covid related underspend to offset this.
Responsible person: Fergus Walker 
Page 83

Page 84

Appendix 1
Page 6 
Corporate Outcome No.1 – People live active, healthier and independent lives 
COI – Percentage of clients satisfied that they are better able to deal with their financial problems following our support and
intervention 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ1 2022/23 100% 100% Green
FQ2 2022/23 100% 100% Green
FQ3 2022/23 100% 100% Green
FQ4 2022/23 100% 95% Red 
This indicator for FQ4 is below the target and performance has decreased since the last reporting period. 
FQ4 Comment
There were no Debt Arrangement Schemes set up in this quarter.  All of the clients provided with a Personal Debt Recovery Action Plan were satisfied.  Out of 13
surveys issued 9 were returned showing 95% of clients satisfied.  2 of the 9 survey returns had comments showing their appreciation of the service and how it had
helped them.
Responsible person: Lee Roberts 
Page 84

Page 85

Appendix 1
Page 7 
Corporate Outcome No.2 – People live in safer and stronger communities 
Number of parking penalty notices issued – Bute and Cowal 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No target 266 No target 
FQ2 2022/23 No target 517 No target
FQ3 2022/23 No target 403 No target
FQ4 2022/23 No target 415 No target 
This indicator for FQ4 shows the number of parking penalty notices has increased since the last reporting period. 
FQ4 Comment
Requirement for lining in Bute and Cowal to allow for enforcement.
Responsible person: Hugh O’Neill 
Number of parking penalty notices issued – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No target 2,043 No target 
FQ2 2022/23 No target 2,124 No target
FQ3 2022/23 No target 1,343 No target
FQ4 2022/23 No target 1,332 No target 
This indicator for FQ4 shows the number of parking penalty notices has decreased slightly since the last reporting period. 
FQ4 Comment
Seasonal car parks remain free, various signing and lining issues throughout region.
Responsible person: Hugh O’Neill 
Page 85

Page 86

Appendix 1
Page 8 
Corporate Outcome No.2 – People live in safer and stronger communities 
Car parking income to date – Bute and Cowal 
Performance is presented cumulatively for both Area and Council-wide levels.  For individual car parks, the income is presented on a quarterly basis. 
Reporting Period Target
(Cumulative)
Actual
(Cumulative) Status
FQ1 2022/23 £21,604 £4,237 Red
FQ2 2022/23 £53,904 £13,203 Red
FQ3 2022/23 £70,063 £29,825 Red
FQ4 2022/23 £85,667 £42,381 Red 
This indicator for FQ4 shows the cumulative amount of income collected is significantly lower than the cumulative target.  There is no performance trend as this
data is cumulative. 
FQ4 Comment 
The end of FQ4 shows an under-recovery of £43,286.  It is difficult to ascertain the exact reasons for under-recovery in parking income however it can be affected
by such things as events, weather and community.  The upgrade of the remaining cash only parking meters (across the whole Council area) is due to start in
May/June 2023; this will provide multi-payment options and may deliver an increase in ticket income.
Responsible person: Hugh O’Neill 
Actual quarterly income collected in Bute and Cowal for FQ3 and FQ4. 
Car Park Location FQ3 Actual FQ4 Actual
Guildford Street, Rothesay £184 £154
Church Street, Dunoon £929 £1,947
Swimming Pool, Dunoon £1,674 £2,033
Dunoon Pier £2,608 £120
Moir Street, Dunoon £3,266 £2,800
Argyll Street, Dunoon £2,783 £2,296
Jane Villa, Dunoon £5,062 £3,091
B&C £116 £116 
Page 86

Page 87

Appendix 1
Page 9 
Car parking income to date – Argyll and Bute 
Performance is presented cumulatively for both Area and Council-wide levels. 
Reporting Period Target
(Cumulative)
Actual
(Cumulative) Status
FQ1 2022/23 £250,661 £165,678 Red
FQ2 2022/23 £625,430 £491,453 Red
FQ3 2022/23 £812,919 £709,585 Red
FQ4 2022/23 £993,968 £817,788 Red 
This indicator for FQ4 shows the cumulative amount of income collected is significantly lower than the cumulative target.  There is no performance trend as this
data is cumulative. 
FQ4 Comment 
Improved income in both MAKI and OLI areas but overall there is an under-recovery in income of £176,180.  It is difficult to ascertain the exact reasons for under-
recovery in parking income however it can be affected by such things as events, weather and commuting.  The upgrade of the remaining cash only parking meters
(across the whole Council area) is due to start in May/June 2023; this will provide multi-payment options at all (RIS) on and off street parking facilities and may
deliver an increase in ticket income.
Responsible person: Hugh O’Neill 
Page 87

Page 88

Appendix 1
Page 10 
Corporate Outcome No.2 – People live in safer and stronger communities 
Dog fouling – total number of complaints – Bute and Cowal 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 13 No Target 
FQ2 2022/23 No Target 15 No Target
FQ3 2022/23 No Target 19 No Target
FQ4 2022/23 No Target 25 No Target 
This indicator for FQ4 shows the number of dog fouling complaints has increased since the last reporting period. 
FQ4 Comment
The number of dog fouling complaints has risen again.  Cowal has dropped slightly from 12 to 8 with Bute increasing from 7 to 17.  The Warden service will
continue with their patrols and liaising with their partners in an attempt to deal with this problem.
Responsible person: Tom Murphy 
Dog fouling – total number of complaints – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 61 No Target 
FQ2 2022/23 No Target 45 No Target
FQ3 2022/23 No Target 47 No Target
FQ4 2022/23 No Target 77 No Target 
This indicator for FQ4 shows the number of dog fouling complaints has increased significantly since the last reporting period. 
FQ4 Comment
The number of dog fouling complaints received this quarter is high with a total of 77; B&C: 25, H&L: 8, MAKI: 26 and OLI: 18.  The Warden service will continue to
monitor and liaise with partners in a bid to educate and reduce the numbers.
Responsible person: Tom Murphy 
Page 88

Page 89

Appendix 1
Page 11 
Corporate Outcome No.3 – Children and young people have the best possible start 
COI – Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring
plans in place 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ1 2022/23 100% 100% Green
FQ2 2022/23 100% 100% Green
FQ3 2022/23 100% 100% Green
FQ4 2022/23 100% 100% Green 
This indicator for FQ4 is on track with no change in performance since the last reporting period. 
FQ4 Comment
There is individual tracking and monitoring in place on SEEMIS in schools for care experienced children and young people.  In addition to this, the Principal Teacher
for care experienced children and young people monitors the information in SEEMIS and has subsequent conversations with staff in schools to ensure care
experienced children and young people are receiving all the support they need to achieve and that the staff in school have the right strategies in place to help the
child remain engaged with their education attainment and achievement.  Often the care experienced health and wellbeing officers are used to provide extra
support for the child and the family.  The new Virtual Head Teacher post started on 17th April 2023.
Responsible person: Louise Lawson 
Page 89

Page 90

Appendix 1
Page 12 
Corporate Outcome No.3 – Children and young people have the best possible start 
COI – Provide quality meals with cost margins to all pupils 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 +/-5.00% 3.77% Green 
FQ2 2022/23 +/-5.00% 0.98% Green
FQ3 2022/23 +/-5.00% 6.09% Red
FQ4 2022/23 +/-5.00% -2.56% Green 
This indicator for FQ4 is within the +/-5% target variance and performance has improved since the last reporting period. 
FQ4 Comment
Total percentage variance for Argyll and Bute -2.56%.  We will continue to monitor any locations continuing to have food cost percentages over this target.
B&C -6.15%
H&L -2.00%
MAKI -2.00%
OLI -0.80%
Responsible person: Jayne Jones 
Page 90

Page 91

Appendix 1
Page 13 
Corporate Outcome No.4 – Education, skills and training maximises opportunities for all 
Maximise the percentage of 16-19 years olds participating in education, training or employment – Bute and Cowal 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 94.00% 92.70% Red 
FQ2 2022/23 94.00% 94.36% Green
FQ3 2022/23 94.00% 92.17% Red
FQ4 2022/23 94.00% 91.80% Red 
This indicator for FQ4 is below target and performance has decreased since the last reporting period. 
FQ4 Comment
As of 20/03/2023, the participation figure for B&C was 805 pupils which equates to 91.8%.  This is 2.1% below the Argyll and Bute Participation figure for 2021/22
of 93.9%.
Responsible person: Simon Easton 
Maintain the percentage of 16-19 years olds in Argyll and Bute participating in education, training or employment services – Argyll and
Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 94.00% 94.00% Green 
FQ2 2022/23 94.00% 93.90% Red
FQ3 2022/23 94.00% 93.90% Red
FQ4 2022/23 94.00% 93.62% Red 
This indicator for FQ4 is slightly below target and performance has decreased slightly since the last reporting period. 
FQ4 Comment
The Annual Participation Measure for 2021/22 was released on 31/08/2022 which showed 93.9% of young people aged 16-19 were participating (in work, training
or education).  This figure is 0.4% above the national average. 3.8% were not participating, which is 0.2% below the national average. 2.3% were unconfirmed,
which is 1.3% below the national average.  As at 20/03/2023, the Participation figure for Argyll and Bute stood at 3,640 pupils which equates to 93.62%.
Responsible person: Simon Easton
Page 91

Page 92

Appendix 1
Page 14 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Number of affordable social sector new builds completed per annum – Bute and Cowal 
Reporting Period Target Actual Status
FQ1 2022/23 0 0 Green
FQ2 2022/23 0 0 Green
FQ3 2022/23 0 0 Green
FQ4 2022/23 0 0 Green 
This indicator for FQ4 shows the number of completions has remained the same since the last reporting period. 
FQ4 Comment
No units were scheduled for completion in FQ4.
Responsible person: Allan Brandie 
Number of affordable social sector new builds completed per annum – Argyll and Bute 
Reporting Period Target Actual Status
FQ1 2022/23 36 36 Green
FQ2 2022/23 48 48 Green
FQ3 2022/23 37 37 Green
FQ4 2022/23 67 67 Green 
This indicator for FQ4 shows the number of completions has met the target for the reporting period. 
FQ4 Comment
B&C No units were scheduled for completion in FQ4.
H&L Loretto Housing Association (Wheatley Group) Development at Sawmill Field; 32 General Needs and 4 Amenity (made up of 8 x 1 bed Flats, 12 x 2 bed
Flats, 10 x 2 bed Houses, 6 x 3 bed Houses).  All for social rent.
MAKI Argyll Community Housing Association Development at Oakhill Tarbert; 4 General Needs (made up of 4 x 3 bed houses).  All for social rent.
OLI Link Group Development at Dunbeg Phase 3; 23 General Needs (made up of 7 x 2 bed Terraced Houses, 15 x 3 bed Semi Detached/Terraced Houses, 1 x 4
bed End Terrace House) and 4 wheelchair accessible (4 x 2 bed Wheelchair Bungalows).  All for social rent.
Responsible person: Alan Brandie
Page 92

Page 93

Appendix 1
Page 15 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Percentage of pre-planning application enquiries processed within 20 working days – Bute and Cowal 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 75.0% 75.0% Green 
FQ2 2022/23 75.0% 45.5% Red
FQ3 2022/23 75.0% 50.0% Red
FQ4 2022/23 75.0% 55.6% Red 
This indicator for FQ4 is below target however performance has improved since` the last reporting period. 
FQ4 Comment
Performance across Development Management remains impacted by extended periods of operating with staff vacancies and a backlog of casework from the
pandemic.  The introduction of National Planning Framework 4 in February 2023 by The Scottish Government has further impacted on productivity as the
Development Management staff interpret this new policy landscape and its implications for current applications and enquiries.
Responsible person: Peter Bain 
Percentage of pre-planning application enquiries processed within 20 working days – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 75.0% 60.5% Red 
FQ2 2022/23 75.0% 64.7% Red
FQ3 2022/23 75.0% 52.5% Red
FQ4 2022/23 75.0% 55.4% Red 
This indicator for FQ4 is below target however performance has increased since the last reporting period. 
FQ4 Comment
Performance across Development Management remains impacted by extended periods of operating with staff vacancies and a backlog of casework from the
pandemic.  The introduction of National Planning Framework 4 in February 2023 by The Scottish Government has further impacted on productivity as the
Development Management staff interpret this new policy landscape and its implications for current applications and enquiries.
Page 93

Page 94

Appendix 1
Page 16 
Responsible person: Peter Bain 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Householder planning applications – average number of weeks to determine – Bute and Cowal 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 8.0 weeks 14.9 weeks Red 
FQ2 2022/23 8.0 weeks 10.6 weeks Red
FQ3 2022/23 8.0 weeks 8.1 weeks Red
FQ4 2022/23 8.0 weeks 20.2 weeks Red 
This indicator for FQ4 has not met the target and performance has significantly decreased since the last reporting period. 
FQ4 Comment
This measure only relates to planning applications received for alterations to existing premises.
Performance across Development Management remains impacted by extended periods of operating with staff vacancies and a backlog of casework from the
pandemic.  The introduction of National Planning Framework 4 in February 2023 by The Scottish Government has further impacted on productivity as the
Development Management staff interpret this new policy landscape and its implications for current applications and enquiries.
Responsible person: Peter Bain 
Householder planning applications – average number of weeks to determine – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 8.0 weeks 12.4 weeks Red 
FQ2 2022/23 8.0 weeks 13.1 weeks Red
FQ3 2022/23 8.0 weeks 12.0 weeks Red
FQ4 2022/23 8.0 weeks 17.3 weeks Red 
This indicator for FQ4 has not met the target and performance has decreased significantly since the last reporting period. 
FQ4 Comment
This measure only relates to planning applications received for alterations to existing premises.
Page 94

Page 95

Appendix 1
Page 17 
Performance across Development Management remains impacted by extended periods of operating with staff vacancies and a backlog of casework from the
pandemic.  The introduction of National Planning Framework 4 in February 2023 by The Scottish Government has further impacted on productivity as the
Development Management staff interpret this new policy landscape and its implications for current applications and enquiries.
Responsible person: Peter Bain 
Benchmarking
The year-end statistics from The Scottish Government were published on 31st August. FY21/22 benchmarking figures have now been updated and FY22/23 have
been forward projected in the usual way.  Readers should note that our own Pyramid data in Development Management measures is "unadjusted", whereas that
of the benchmarks (represented by the blue and green columns on the graph) is adjusted for "clock-stopping".  Clock-stopping is where The Scottish Government
allow for the removal of specific time periods for identified applications where delays were out with the control of the Local Planning Authority. 
Page 95

Page 96

Appendix 1
Page 18 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – The number of new homeless applicants who required temporary accommodation this period 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 32 No Target 
FQ2 2022/23 No Target 28 No Target
FQ3 2022/23 No Target 41 No Target
FQ4 2022/23 No Target 30 No Target 
This indicator for FQ4 shows the number of applicants has decreased since the last reporting period. 
FQ4 Comment
During FQ4, the housing service provided temporary accommodation for 30 new homeless households.
B&C 9
H&L 4
MAKI 1
OLI 16
Responsible Person: Morven Macintyre 
Page 96

Page 97

Appendix 1
Page 19 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Maintain the percentage of local suppliers that benefit from the awards of contracts via the procurement portal 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 20.0% 13.2% Red 
FQ2 2022/23 20.0% 22.2% Green
FQ3 2022/23 20.0% 19.4% Red
FQ4 2022/23 20.0% 22.5% Green 
This indicator for FQ4 is above target and performance has increased since the last reporting period. 
FQ4 Comment
Of the 9 bids made by local contractors, 9 were awarded the contract with a total value of over £883k.  A summary of all contracts awarded in FQ4 is available. 
The Procurement, Commercial and Contract Management Team (PCCMT) continue to support local suppliers by providing useful information on the Council’s
website i.e. pre-recorded webinars on how to bid for Council contracts, hints and tips for tendering as well as our contract plan, details of upcoming supplier
development events and our category officer’s contact details all of which enable local suppliers to be able to bid for our contracts.
Responsible person: Anne MacColl-Smith 
Page 97

Page 98

Appendix 1
Page 20 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Increase the number of community benefits that are delivered through contracts we award locally 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ1 2022/23 No Target - No Target
FQ2 2022/23 No Target 30 No Target
FQ3 2022/23 No Target - No Target
FQ4 2022/23 No Target 43 No Target 
This indicator for FQ4 shows the number of community benefits has increased since the last reporting period. 
FQ4 Comment
This indicator is reported in FQ2 and FQ4.
The Procurement, Commercial and Contract Management Team (PCCMT) has been working closely with their suppliers to deliver additional social, economic and
environmental value and achieved 43 community benefits through Contract Management, Contract Awards and the Request List from 1st October 2022 to 31st
March 2023.  Further details are available.
Responsible person: Anne MacColl-Smith 
Page 98

Page 99

Appendix 1
Page 21 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
Street lighting – percentage of faults repaired within 10 days – Bute and Cowal 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 75% 32% Red 
FQ2 2022/23 75% 65% Red
FQ3 2022/23 75% 33% Red
FQ4 2022/23 75% 30% Red 
This indicator for FQ4 is below target and performance has decreased slightly since the last reporting period. 
FQ4 Comment
The percentage of faults completed within the 10 day indicator is 30% in FQ4.  This represents a drop of 3% in performance from FQ3.  The throughput of
instructions is also down, with 21 jobs completed within the timescale from a total of 69 jobs completed and signed off within the quarter.
Responsible person: Tom Murphy 
The percentage of street lighting faults are completed within 10 working days – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 75% 29% Red 
FQ2 2022/23 75% 48% Red
FQ3 2022/23 75% 30% Red
FQ4 2022/23 75% 32% Red 
This indicator for FQ4 is below target however performance has increased slightly since the last reporting period. 
FQ4 Comment
The total number of Street Lighting jobs completed in FQ4 was 393, similar (up 10) to the throughput of instructions in FQ3.  Of this total number of completed
jobs, 125 were completed within the 10 day timescale for dark lamps, giving a performance of 32%, again a slight increase of 2% on the performance in FQ3. 
Similar to FQ3, more jobs were completed and closed off than new ones raised, 393 vs 280, which has resulted in a continued reduction in the repairs backlog.
Responsible person: Tom Murphy 
Page 99

Page 100

Appendix 1
Page 22 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
Total number of complaints regarding waste collection – Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 5 No Target 
FQ2 2022/23 No Target 4 No Target
FQ3 2022/23 No Target 1 No Target
FQ4 2022/23 No Target 3 No Target 
This indicator for FQ4 shows the number of waste collection complaints has increased slightly since the last reporting period. 
FQ4 Comment
There were only 3 waste collection complaints this quarter on the Isle of Bute, given the number of properties serviced, this is a good level of service.
Responsible person: Tom Murphy 
Total number of complaints regarding waste collection – Cowal 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 4 No Target 
FQ2 2022/23 No Target 8 No Target
FQ3 2022/23 No Target 1 No Target
FQ4 2022/23 No Target 3 No Target 
This indicator for FQ4 shows the number of waste collection complaints has increased slightly since the last reporting period. 
FQ4 Comment
There were only 3 waste collection complaints received for the Cowal area this quarter, again for the number of properties serviced this is a good level of service.
Responsible person: Tom Murphy 
Page 100

Page 101

Appendix 1
Page 23 
Total number of complaints regarding waste collection – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 58 No Target 
FQ2 2022/23 No Target 65 No Target
FQ3 2022/23 No Target 35 No Target
FQ4 2022/23 No Target 53 No Target 
This indicator for FQ4 shows the number of waste collection complaints has increased since the last reporting period. 
FQ4 Comment
There were a total of 53 waste collection complaints received this quarter, although this may seem high, given the number of properties serviced and the
operational difficulties and staffing issues this is still a good level of service.
Responsible person: Tom Murphy 
Page 101

Page 102

Appendix 1
Page 24 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
COI – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 45.0% 52.1% Green 
FQ2 2022/23 45.0% 50.5% Green
FQ3 2022/23 45.0% 56.7% Green
FQ4 2022/23 45.0% 52.0% Green 
This indicator for FQ4 is above target however performance has decreased since the last reporting period. 
FQ4 Comment
52% recycling/composting and recovery (40.7% recycling/composting and 11.3% recovery) in Q4.  Overall 22/23 f/year rates are 52.6% recycling/composting and
recovery (39.2% recycling/composting plus 13.4% recovery).  Recovery is higher than normal in PPP area due to a trial by Renewi (formerly Shanks), who have
taken some residual general waste for disposal mainly from their Dalinlongart (by Dunoon) waste facility to an energy from waste (EFW) plant near Edinburgh. 
Recycling and composting in PPP area has also been higher mainly due to Renewi sending stockpiled wood waste for onward recycling and green garden waste for
onward composting.  These have both helped offset the reduction in recycling and recovery from the Helensburgh and Lomond area following on from The
Scottish Government Landfill Tax Abatement Order (which commenced from 1st July 2022), whereby Barr Environmental no longer carry out any recycling or
recovery from mixed residual general waste.
Responsible person: John Blake 
Renewi (formerly Shanks) – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 54.4% No Target 
FQ2 2022/23 No Target 58.1% No Target
FQ3 2022/23 No Target 67.4% No Target
FQ4 2022/23 No Target 61.9% No Target
Page 102

Page 103

Appendix 1
Page 25 
This indicator for FQ4 shows the percentage of waste recycled has decreased since the last reporting period. 
FQ4 Comment
61.9% recycling/composting and recovery (44.2% recycling/composting and 17.7% recovery) in Q4.  22/23 f/year rates in PPP area are 60.4% recycling/composting
and recovery (39.7% recycling/composting plus 20.7% recovery).  Recovery is higher than normal in PPP area due to a trial by Renewi (formerly Shanks), who have
taken some residual general waste for disposal mainly from their Dalinlongart (by Dunoon) waste facility to an energy from waste (EFW) plant near Edinburgh. 
Recycling and composting in PPP area has also been higher mainly due to Renewi sending stockpiled wood waste for onward recycling and green garden waste for
onward composting.
Responsible person: John Blake 
Islands – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 33.3% No Target 
FQ2 2022/23 No Target 34.7% No Target
FQ3 2022/23 No Target 43.5% No Target
FQ4 2022/23 No Target 35.9% No Target 
This indicator for FQ4 shows the percentage of waste recycled has decreased since the last reporting period. 
FQ4 Comment
35.9% recycling/composting and recovery (35.9% recycling/composting and 0% recovery).  22/23 f/year rates are 36.8% recycling/composting and recovery (36.5%
recycling and recovery and 0.3% recovery) which is similar to previous year.
Responsible person: John Blake 
Page 103

Page 104

Appendix 1
Page 26 
H&L – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 53.6% No Target 
FQ2 2022/23 No Target 41.0% No Target
FQ3 2022/23 No Target 37.5% No Target
FQ4 2022/23 No Target 34.5% No Target 
This indicator for FQ4 shows the percentage of waste recycled has decreased since the last reporting period. 
FQ4 Comment
34.5% recycling/composting and recovery (34.3% recycling/composting and 0.2% recovery) in Q4. 22/23 f/year rates in Helensburgh and Lomond area are 41.3%
recycling/composting and recovery (39.1% recycling/composting plus 2.2% recovery).  There has been a reduction in recycling and recovery from the Helensburgh
and Lomond area following on from The Scottish Government Landfill Tax Abatement Order (which commenced from 1st July 2022), whereby Barr Environmental
no longer carry out any recycling or recovery from mixed residual general waste.
Responsible person: John Blake 
Page 104

Page 105

Appendix 1
Page 27 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
COI – The number of tonnes of waste sent to landfill 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 5,850 4,546 Green 
FQ2 2022/23 5,550 4,947 Green
FQ3 2022/23 5,100 3,882 Green
FQ4 2022/23 5,000 4,610 Green 
This indicator for FQ4 is below target (lowest is best) and performance has decreased since the last reporting period. 
FQ4 Comment
Landfill tonnages within limits in Q4 and f/year.  Main reason for slight reduction in landfill during year is due to a trial by Renewi (formerly Shanks), who have
taken some residual general waste for disposal mainly from their Dalinlongart (by Dunoon) waste facility to an energy from waste (EFW) plant near Edinburgh. 
This has helped offset the reduction in recycling and recovery from the Helensburgh and Lomond area following on from The Scottish Government Landfill Tax
Abatement Order (which commenced from 1st July 2022), whereby Barr Environmental no longer carry out any recycling or recovery from mixed residual general
waste.
Responsible person: John Blake 
Page 105

Page 106

Appendix 1
Page 28 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
LEAMS (Local Environment Audit and Management System) – Bute
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 73 81 Green 
FQ2 2022/23 73 78 Green
FQ3 2022/23 73 80 Green
FQ4 2022/23 73 79 Green 
This indicator for FQ4 is above target however performance has decreased slightly since the last reporting period. 
FQ4 Comment
The Isle of Bute figures for the 4th quarter are January 78, February 79 and March 78, all well above the National Standard and Benchmark Figure.  This shows a
good level of performance.
Responsible person: Tom Murphy 
LEAMS (Local Environment Audit and Management System) – Cowal
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 73 78 Green 
FQ2 2022/23 73 76 Green
FQ3 2022/23 73 76 Green
FQ4 2022/23 73 77 Green 
This indicator for FQ4 is above target and performance has increased slightly since the last reporting period. 
FQ4 Comment
The level of street cleanliness in Cowal remains steady at 77 for each month, this is a good level of service.
Responsible person: Tom Murphy 
Page 106

Page 107

Appendix 1
Page 29 
LEAMS (Local Environment Audit and Management System) – Argyll and Bute
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 73 85 Green 
FQ2 2022/23 73 82 Green
FQ3 2022/23 73 83 Green
FQ4 2022/23 73 83 Green 
This indicator for FQ4 is above target with no change in performance since the last reporting period. 
FQ4 Comment
Again this quarter the level of street cleanliness for the whole are remains very high.  The role of the Amenity Warden has a key influence around littering to assist
in maintaining the good level of performance.
Responsible person: Tom Murphy 
Page 107

Page 108

Appendix 1
Page 30 
Making It Happen 
Teacher sickness absence – Bute and Cowal 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 1.97 days No Target 
FQ2 2022/23 No Target 1.36 days No Target
FQ3 2022/23 No Target 2.36 days No Target
FQ4 2022/23 No Target 3.61 days No Target 
This indicator for FQ4 shows the number of sickness absence days has increased since the last reporting period. 
FQ4 Comment
Teacher absence has increased by 1.5 days on the same quarter last year and 1.25 days on the quarter previous.  The absence reasons of medical treatment and
stress saw big increases in number of days lost over the previous quarter.
Responsible person: Simon Easton 
Teacher sickness absence – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 1.79 days No Target 
FQ2 2022/23 No Target 1.22 days No Target
FQ3 2022/23 No Target 1.70 days No Target
FQ4 2022/23 No Target 2.48 days No Target 
This indicator for FQ4 shows the number of sickness absence days has increased since the last reporting period. 
FQ4 Comment
Overall teacher absence has increased by almost 3/4 of a day on the same quarter last year and by 3/4 of a day on the previous quarter.  The top reason for
absence is infections, followed by stress and then medical treatment.
Responsible person: Simon Easton 
Page 108

Page 109

Appendix 1
Page 31 
Making It Happen 
LGE staff (non-teacher) sickness absence – Bute and Cowal 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 4.12 days No Target 
FQ2 2022/23 No Target 3.76 days No Target
FQ3 2022/23 No Target 3.97 days No Target
FQ4 2022/23 No Target 4.65 days No Target 
This indicator for FQ4 shows the number of sickness absence days has increased since the last reporting period. 
FQ4 Comment
The same as Teacher absence LGE absence saw a 1.5 day increase on the same quarter last year and just over half a day increase on the previous quarter.  The
biggest reason for absence was stress and that saw a 42% increase on work days lost compared with the last quarter.
Responsible person: Carolyn Cairns 
LGE staff (non-teacher) sickness absence – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 No Target 3.57 days No Target 
FQ2 2022/23 No Target 3.66 days No Target
FQ3 2022/23 No Target 3.65 days No Target
FQ4 2022/23 No Target 4.04 days No Target 
This indicator for FQ4 shows the number of sickness absence days has increased since the last reporting period. 
FQ4 Comment
Overall LGE absence has increased by just over half a day on the same quarter last year and just under half a day on the previous quarter.  The top three reasons
for absence are stress, infections and other musculoskeletal reasons.
Responsible person: Carolyn Cairns
Page 109

Page 110

Appendix 1
Page 32 
Making It Happen 
COI – Increase the percentage of all self-service automated contacts 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2022/23 70.0% 79.4% Green 
FQ2 2022/23 70.0% 75.4% Green
FQ3 2022/23 70.0% 72.5% Green
FQ4 2022/23 70.0% 72.2% Green 
This indicator for FQ4 is above target however performance has decreased slightly since the last reporting period. 
FQ4 Comment
In FQ4 there were 36,799 transactions dealt with by customer service agents (27.8%) and 95,336 automated or self-service transaction (72.2%) so the 70% target
was exceeded.  FQ4 2021/22 2022/23 Mediated 42,712 38,657 Automated 104,938 104,572.
Responsible person: Robert Miller 
Page 110

Page 111

ARGYLL AND BUTE COUNCIL                                        BUTE AND COWAL 
AREA COMMITTEE                                                                                                         
ROADS AND INFRASTRUCTURE                                   JUNE 2023
SERVICES                     
ROADS AND INFRASTRUCTURE SERVICES UPDATE 
1.0 INTRODUCTION 
1.1 A Roads and Infrastructure standing report was a fixture on Area Committee
agendas throughout the life of the last Council. In the first two rounds of Area
Committee meetings in the new Council feedback was sought on the value of
these updates, and their format and frequency. Generally Members felt having a
standard item was beneficial and it was acknowledged that the Roads and
Infrastructure weekly briefings issued to all members each Friday afternoon
provide for the main sources of live information on current activities. On top of
these briefings there is a bank of resources on the new Member Zone system
which include the weekly briefings, subject specific briefings, ad hoc short
briefings on issues, relevant previous committee reports, operational service
procedures, legislation and Council policies. 
1.2 In the last Council the purpose of these reports was to provide an update on
service activities but since weekly briefings were introduced around 18 months
ago (at the time of writing this report we are on to briefing Edition 97) these have
largely superseded the original stated purpose of these reports. 
1.3 On the basis of the above this new format has been agreed through the
December 2022 round of area committees for this standing item. This format 
removes duplication for Officers and rather links to existing published
information, with additional updates only in the body of the reports if these are
specifically requested/noted from previous meetings. The report remains as a
standing item and continues to provide the opportunity for Officer engagement at
the committee meetings.   
2.0 RECOMMENDATIONS 
It is recommended that the Area Committee: 
2.1 Note and consider the contents of this report. 
Page 111 Agenda Item 8

Page 112

3.0 DETAIL 
3.1 Roads and Infrastructure Services provides Members with weekly briefings on
topical service activities which are all available here.   
3.2 As part of the resources on the new Member Zone system there are various key
documents available in an online library here. 
4.0 CONCLUSION 
4.1 This report provides links to existing published information on service activities
and provides for the opportunity for Officer attendance and engagement at
committee meetings. 
5.0 IMPLICATIONS 
5.1 Policy – Roads and Infrastructure work to a number of policies across the range
of service areas 
5.2 Financial – revenue and capital budgets are in place to deliver projects and
cyclic work 
5.3  Legal – none known 
5.4  HR – none known 
5.5  Fairer Scotland Duty: 
5.5.1   Equalities - protected characteristics – where appropriate EqSEIAs will be
carried out to identify any implications 
5.5.2   Socio-economic Duty – where appropriate EqSEIAs will be carried out to
identify any implications 
5.5.3 Islands – where appropriate Island impacts assessments will be carried out to
identify any implications 
5.6. Climate Change – due regard will be given to climate change with a view to
minimising any climate change impact and these will be considered as and
when they arise 
5.7  Risk – risk managed through toolbox talks, safety briefings and where
appropriate risk registers – all of the above are monitored through the RIS
leadership and management teams 
5.8  Customer Service – none known 
Page 112

Page 113

Executive Director with responsibility for Roads and Infrastructure Services,
Kirsty Flanagan 
Policy Lead for Roads and Transport, Councillor Andrew Kain 
May 2023                                                  
For further information contact: 
Jim Smith, Head of Roads and Infrastructure Services; or Mark Calder, Project
Manager 
Page 113

Page 114

This page is intentionally left blank

Page 115

ARGYLL AND BUTE COUNCIL  BUTE AND COWAL AREA
COMMITTEE 
ROADS AND INFRASTRUCTURE
SERVICES 
JUNE 2023 
CEMETERY MAINTENANCE AND ROADS ACCESS FUND 
1.0 INTRODUCTION 
1.1 At the Policy and Resources Committee in October 2022 it was agreed that,
subject to confirmation of the Crown Estates allocation for 2022-23, to allocate
£300,000 towards a Cemetery Maintenance and Roads Access Improvement
Fund (£75,000 for each administrative area). This report provides options for
approval and has been informed by a meeting with the Bute and Cowal
Members.   
2.0 RECOMMENDATIONS 
2.1 It is recommended that the Area Committee:
 agree the package of proposals up to the value of £75,000,
 note that regular updates will be provided via the Roads and Infrastructure
weekly briefing. 
3.0 DETAIL 
3.1 The Council allocated £300,000 of Crown Estate funding to a Cemetery
Maintenance and Roads Access Fund, to be split between the four
administrative areas (£75k each).  A Bute and Cowal business day meeting was
held on 3 March 2023 where officers presented some suggestions for use of
the Fund and the following proposals were discussed as priorities for members: 
Area Location Proposed Works Estimated
Cost 
Bute Barone
Cemetery 
New foundation for headstone and a path,
upgrade old paths.
£15,000 
North Bute
Cemetery
Put in roadway to assist getting hearse
closer to lairs at the top of cemetery and
upgrade foot paths
£10,000 
Dunoon Knock down and remove old toilet £10,000
Page 115 Agenda Item 9

Page 116

3.2 It is proposed that regular updates on progress will be provided via the Roads
and Infrastructure weekly briefing. 
3.3 In the future, it is open to the Policy and Resources Committee to consider
allocating further funding from the Crown Estates allocation to a second phase
Cemetery Maintenance and Roads Access Fund, if Members agreed that this
was a good use of funding.   
4.0 CONCLUSION 
4.1 This report provides the Bute and Cowal Area Committee with options on how
to spend the £75,000 that has been allocated from the Crown Estates funding
to a Cemetery Maintenance and Roads Access Fund. 
5.0 IMPLICATIONS 
5.1 Policy – Policy decision taken through P&R Committee for this funding
allocation 
5.2 Financial – Crown Estate Funding allocation of £75,000 per administrative area. 
5.3  Legal – none known 
5.4  HR – none known. 
5.5  Fairer Scotland Duty: none known. 
5.5.1   Equalities - protected characteristics – where appropriate EqSEIAs will be
carried out to identify any implications 
cemetery block/shelter-excavate any service pipes  
Cowal Cowal
Cemetery
North extension within existing footprint -
drainage and access paths.   New fence
with possible access into the woodland
area on the south side of the cemetery. 
£30,000 
Strachur
cemetery
Extend the last border in the new extension
and form a small area for ash internments  
£5,000 
Millhouse
cemetery 
Extend the turning/parking area and create
parking spaces using existing scalping’s to
keep the cost down—extend the main road
into the cemetery  
£5,000
Page 116

Page 117

5.5.2   Socio-economic Duty – where appropriate EqSEIAs will be carried out to
identify any implications 
5.5.3 Islands – where appropriate Island impacts assessments will be carried out to
identify any implications 
5.6. Climate Change – due regard will be given to climate change with a view to
minimising any climate change impact and these will be considered as and
when they arise 
5.7  Risk – risk managed through toolbox talks, safety briefings and where
appropriate risk registers – all of the above are monitored through the RIS
leadership and management teams 
5.8 Customer Service – the works to the cemeteries will help towards improving
customer experience.   
Executive Director with responsibility for Roads and Infrastructure: Kirsty
Flanagan
Head of Roads and Infrastructure: Jim Smith 
Policy Lead for Roads and Infrastructure Councillor Ross Moreland 
May 2023                                                  
For further information contact: 
Tom Murphy, Operations Manager
Jim Smith, Head of Roads and Infrastructure Service 
Page 117

Page 118

This page is intentionally left blank

Page 119

1 
Year One Progress Report
Page 119 Agenda Item 10

Page 120

2
Contents
Foreword ........................................................................ 4
Introduction .................................................................... 5
Key Achievements ........................................................... 6
Children’s Services ............................................................................................................. 6
Child Poverty ......................................................................................................................... 6
Child Protection .................................................................................................................... 7
Violence Against Women and Girls ............................................................................... 8
Adult Protection ................................................................................................................... 9
Community Justice ........................................................................................................... 10
Public Health ....................................................................................................................... 11
Right Care Right Time ..................................................................................................... 12
Adult Care –Older Adults/Adults and Hospitals ..................................................... 13
Learning Disabilities ......................................................................................................... 14
Mental Health ...................................................................................................................... 15
Primary Care ....................................................................................................................... 16
Dentistry ............................................................................................................................... 17
Alcohol and Drug Partnership (ADP) .......................................................................... 18
Allied Health Professionals (AHP) ................................................................................ 22
Carers .................................................................................................................................... 22
Prevention Programme ................................................................................................... 23
Digital Health and Care Strategy ................................................................................ 23
Coporate Services ............................................................................................................. 24
Technology Enabled Care (TEC) .................................................................................. 24
Performance Management and Governance ........................ 26
Introduction ......................................................................................................................... 26
Integrated Performance Management Framework (IPMF) ................................ 26
Key Performance Overview ........................................................................................... 27
Benchmarking ..................................................................................................................... 27
Waiting Times & Long Waits ......................................................................................... 27
Homecare ............................................................................................................................. 28
Residential Care ................................................................................................................. 29
Delayed Discharge ............................................................................................................ 29
Adult Support & Protection ............................................................................................ 30
Resilience in Care at Home (Unmet Need).............................................................. 30
Page 120

Page 121

3
Children & Families ........................................................................................................... 31
Community Health ............................................................................................................ 32
Adult Care ............................................................................................................................ 32
Technology Enabled Care & Falls ................................................................................ 33
Child & Adolescent Mental Health & Psychological Therapies .......................... 34
Winter & Systems Pressures ......................................................................................... 34
Financial Performance and Best Value ............................... 35
Financial Performance ..................................................................................................... 35
Financial Performance 2022-23 ................................................................................... 35
Financial Outlook, Risks and Plans for the Future ................................................ 35
Best Value ............................................................................................................................ 36
Appendices ................................................................... 39
Appendix 1 IJB Scorecard ................................................................................................... 39
Appendix 2 HWBOI’s/ Benchmarking .............................................................................. 41 
Page 121

Page 122

4 
Foreword 
Argyll and Bute Health and Social Care Partnership has experienced another difficult year as
we try to recover from the obvious challenges of the past few years.
This year the HSCP continued to struggle with workforce sustainability, reduced capacity in
the community and backlogs in our waiting times to name just a few.
Despite this, the HSCP continues to be ambitious for our communities and this report
highlights the positive outcomes the integration of health and social care services can have
on individuals, families and the wider community along with the input of those with lived
experiences of our services.
Our Staff, Partners, Carers and Volunteers continue to demonstrate the upmost dedication,
hard work, resilience and commitment to our services. We continue to be thankful and
grateful for everyone’s efforts in these difficult times. 
Sarah Compton-Bishop                                                           Fiona Davies      
Chair of Argyll & Bute                                                Chief Officer of Argyll & Bute 
Integration Joint Board                                                                HSCP 
Page 122

Page 123

5
Introduction 
Welcome to Argyll and Bute’s Annual Performance report for the year 2021 as required by
Public Bodies (Joint Working) (Scotland) Act of 2014.
This document sets out how the Health and Social Care Partnership (HSCP) has performed
and builds on the information published within previous reports and to provide progress on
how we have improved and adapted, reshaping services which are fit for the future.
The HSCP is a complex organisation bringing together a range of partners, services and
substantial financial resources. The partnership is responsible for meeting local and national
objectives and it is therefore important that we publically report on how we are performing
against the agreed outcomes that we aspire to.
The Annual Performance report provides an opportunity to reflect on the past year. A year
that was extremely challenging yet we were still able to celebrate achievements.
I thank all colleagues and partners for their ongoing efforts to deliver our vision and
essential health and social care services for local people and those most in need, and hope
we can all share in the successes of delivering longer, healthier and independent lives. 
Page 123

Page 124

6
Key Achievements 
Priorities Year 1  Progress
Continue to deliver on the Children and Young
Peoples Service Plan (CYPSP). 
The Children and Young Peoples Service Plan work
continues, the new Plan for 2023 – 26 is currently being
progressed.
Continue to deliver on the Corporate Parenting
Plan.
On track and progress monitored by Corporate Parenting
Board and reported to Strategic Group.
Continue to monitor and evaluate progress in all
our service plans. 
Progress is monitored and evaluated annually, updated are
reported and send to Scottish Government.
Develop transformation aspirations for the Service.  Work is progressing to ensure more young people are
involved in the CYPSP.
Develop programme of change in relation to the
Children’s Promise Change programme. 
The Promise is an ambitious 10 yr national
transformational change programme for Scotland’s Care
system. Local actions embedded in Corporate Parenting
Plan and CYPSP. 
Continue to engage with Children and staff on
transformation agenda. 
We have established 7 locality care experienced
participation forums which meet regularly. 
Work is progressing to ensure more young people are
involved in the CYPSP.
Evaluate the outcomes of the 2018-2021 Argyll and
Bute Equally Safe Implementation Plan. 
A meeting took place to discuss this but it was decided to
delay update in order to align the plan with the Community
Justice Plan.  Update will take place in 2023.
Continue to act as a conduit for information and
resources on Equally Safe / Train/ National
initiatives for managers and staff.
This has been taking place and will continue to do so.
Develop project plan for Transforming Responses to
Violence against Women and Girls Project.  
Plan was developed and will be updated in 2023. 
Priorities Year 1  Progress
Child Poverty Action Group to continue to meet and
develop actions to tackle the three drivers of child
poverty.
Child Poverty Action Group has continued to meet and
monitor and tackle the three drivers of poverty.
Look at impacts of Covid-19 and EU exit; consider
what actions are required by the Child Poverty
Action Group and its members to address these.
This has been done and necessary measures taken by our
members; for example extending the Flexible Food Fund
and ensuring best coverage by advice services.
Produce a formal communications and engagement
plan.
A Communications and Engagement Group has been
formed and there is a draft communications and      
Children’s Services 
Child Poverty
Page 124

Page 125

7 
engagement plan that is being worked on.
Begin to deliver Money Counts training to staff in
Argyll and Bute. 
This has taken place and is ongoing.  There was also the
delivery of a wide range of other training events for staff
designed to improve awareness and service delivery.
Review the Child Poverty Action Plan and assess
progress on key areas of work.
The plan was reviewed and published in 2022.  Reporting
duties were met and the report outlined key areas of
work. 
Begin to develop a Data Base to improve
monitoring and focus of resources locally. 
Data has been collated for the plan and other purposes. 
A new data collection and analysis system “Power BI” is
now being developed and will greatly improve our ability
to recognise areas of local need. 
Priorities Year 1  Progress
All new Child Protection Committee (CPC) members
will receive a CPC induction pack and will meet with
Lead Officer to discuss the role of the CP and
expectations of CPC members. All CPC members will
attend CPC development sessions to contribute to
the role and function of the CPC. Members will be
required to demonstrate through the delivery of the
CPC improvement plan that information is being
disseminated within their organisation and that
actions attributed to their organisation are
progressed and reported to CPC.
Induction pack complete.  All new members have met
with Lead Officer.  This is ongoing as and when new
members attend.
We have recorded via minutes when information has to
be disseminated within organisations and what action
has been taken.
Produce and implement a biennial Strategic
improvement plan which will be monitored by the
Performance, Quality and Assurance (PQA) using a
RAG system. Red actions will be reviewed by PQA
and reported to CPC.
Plan in place and being monitored. Some slippage due
to post Covid challenges and staffing challenges.  CPC
does not currently have a lead officer so plan needs to
be reviewed to ensure on track for rest of 2023.
Multi agency training will be delivered using a tiered
approach to learning which will include: General
contact workforce, Specific contact workforce and
Specialist contact workforce. 
Training has been delivered via online following Covid
challenges.  Some face to face key training delivered. 
Training has had to be halted as CPC does not have a
training officer – awaiting advert and appointment. 
Online training can be accessed across partner agencies. 
This will require to be addressed as soon as the training
officer is in post.
Develop and implement training framework which
supports practitioner knowledge and confidence in
working with Child Sexual Abuse which includes Child
Sexual Exploitation and child trafficking.
This work had to be cancelled last year due to
competing practice demands.  Will be picked up when
the new Lead Officer comes in to post.
Domestic Abuse Guidance and Flowchart
implementation to be evaluated and regular audits of
referrals to be carried out.
Domestic Abuse guidance has been implemented
however no auditing working has taken place.  This
should be a priority during 2023.
Improved interface between children & adult
services particularly where parental mental health
substance misuse and domestic abuse are present.
One meeting has taken place, but still significant work to
align Children and Families and adult processes
Joint session between Adult Protection Committee and
Child Protection planned for May 2023.        
Child Protection
Page 125

Page 126

8 
Advocacy services will engage with children on the
Child Protection register to understand their
experience and to provide the CPC with
recommendations as to how things can be improved. 
CPC receives bi-annual reports from the advocacy
worker.  The reports provide evidence of face to face
engagement with children and seek the views and
comments by children and families.  CPC find these
reports very informative re needs of children on the
Child Protection register. 
Priorities Year 1  Progress
Establish a Project Board to oversee the delivery
of the Transforming Responses to Violence Against
Women and Girls Project.
A board has been established although there have been
difficulties in arranging some meetings.
Use the Domestic Abuse-Informed Practice and
Systems: Self-Assessment Tool to establish a
baseline for services prior to training and service
change measures.
The tool was used and the survey stage undertaken; it
has not yet been possible to complete the process with
the board.
Establish working groups to facilitate training and
other aspects of the transformation project.  
Working Groups have delivered on the necessary areas of
training and on the research elements of the plan.  This
will continue in 2023.
Research to assess the impact of the Transforming
Responses to Violence Against Women and Girls
Project, to begin.
The first phase of research has taken place, looking at
lived experience and staff views of services.  A second
phase looking at the views of perpetrators will take place
in 2023.
Roll out of the Safe and Together Model to
commence. 
This has begun and a large number of staff and some
managers are currently undertaking training.  There has
been some delay due to operational reasons.  Roll out will
continue through 2023 – 2024.
Roll out of other training to commence including;
Awareness Raising; Routine Enquiry; Zero
Tolerance and Commercial Sexual Exploitation. 
Seven events were successfully delivered and this will
continue in 2023-2024.  It was not possible to delivery
Zero Tolerance as the organisation no longer offers
specific training to organisations.  
Roll out of DASH training to relevant workers.  This has been taking place and will continue in 2023.
Review the Argyll and Bute Equally Safe Plan.  This was delayed due to the need to align with
Community Justice Plans.  Will take place in 2023.
Development of Data Base that will assist us to
monitor trends in Domestic Violence and other
gendered violence.
Whilst some data was collected development of a data
base still requires to be done in 2023.
Deliver Annual Return from Argyll and Bute to the
Improvement Service / National Violence Against
Women Forum.
This did take place and will be updated in 2023.        
Violence Against Women and Girls
Page 126

Page 127

9 
Priorities Year 1  Progress
Meet the Improvement Plan targets arising from
Inspection. 
Progress made:-
 We have introduced a trial of a new Chronology
format to ensure standardisation and improve quality
of chronologies.
 We have encouraged in person participation in Adult
Support and Protection (ASP) case conferences where
appropriate and safe to do so.
 Training has been developed to ensure appropriate
use of trained second workers from Health and other
disciplines.
 Through the Council Officer Forum and ASP training
we have ensured regular use of case studies and
Significant Case Review (SCR) Findings.
 Staff support is provided by development of Council
Officer, Multi-Agency Forums and ASP training. 
Emphasis is placed on Trauma Informed Practice via
revised Codes of Practice dissemination.
 Further development of Awareness ASP training
achieved and targeted at specific groups, to improve
knowledge and understanding of ASP process, across
the Partnership, and raise awareness within the
Community.
Implement Code of Practice changes.  We have continued to implement Code of Practice
revision sharing briefings on changes across the
Partnership,  including:- 
 Further detail on the 3 point criteria.
 Clarification on capacity and consent.
 Emphasis on duty to refer and co-operate in Inquiries.
 Clarification regarding sharing expectations and the
new section on chronologies.
 Clarification of relationship between inquiries and
investigations.
 Further detail and clarification on visits and
interviews.
Implement guidance for Primary Care and GP’s.  New guidance introduced July 2022, promoted through
Adult Protection Committee and Authority wide ASP
Action Team. Material passed to NHS colleagues for their
attention.
Progress audit activity, case files. Investigation undertaken to determine most appropriate
platform in order to streamline process. Short life
working group to be established to plan audit proposed
for May/June 2023.        
Adult Protection Page 127

Page 128

10 
Develop issues arising from Initial Case Reviews,
Large Scale Investigation findings. 
Several overarching Adult Protection and Adults with
Incapacity themes have been scrutinised and practice
improvements made with regard to the findings of an
Initial case review.  Specifically process around
Guardianship/Adults with Incapacity/Mental Health
Officer roles, and reviews, Care at Home – Social Work
support, financial management where an individual is
considered an Adult with Incapacity and there is a
requirement for clear lawful authority.
Major review of care at home services and financial
controls introduced following an Initial Case Review.
Develop ‘escalation’ policy.  Recognising that ASP case escalation forms part of a
wider multi-agency escalation policy the service has
contributed to the development of the Partnership’s
Complex Case Escalation Protocol.
Support staff and communities as
recovery from Covid regulation
emerges. 
Emphasis within staff and community awareness training
has been placed on neglect and self-neglect (particularly
identifying signs and symptoms) increasingly evident in
larger numbers since Covid.  Staff have been supported
to consider best practice in ensuring the Adult remains at
the centre of all ASP activity as work practice changes -
working from home, online case conferences. 
Priorities Year 1  Progress
Develop a local Community Justice Outcome
Improvement Plan, in line with the priorities of
the Scottish Government national Justice and
Community Justice Strategies. 
Refreshed National Strategy for Community Justice
published June 2022.  Associated Outcomes, Performance
and Improvement Framework delayed publication date
now 01/04/2023.  Local plan development progressing
well, draft key actions agreed by Community Justice
Partnership, statutory consultation process underway. 
Expected publication date June 2023.  
Develop strategic and operational links with Third
Sector and Children’s Services (Youth Justice) and
other key local partnerships. 
Community Justice Partnership agreed a Youth Justice
work stream, in the process of establishing a multi-agency
sub group. 
Third Sector statutory consultation underway in relation
to development of the local Community Justice Outcome
Improvement Plan.
Support and monitor the implementation of the
Justice Social Work (Community Justice)
Improvement Plan. 
Justice Social Work Service Plan is complete, Community
Justice Partnership scrutiny process in final stages of
completion, reliant on the publication of the Scottish
Government Outcomes and Performance Improvement
Framework due 1 April 2023.
Review the learning from the first phase jointly
commissioned research report for Violence
Against Women & Girls and implement key
recommendations.
Final report due March 2023.  Draft report (excluding
analysis and key findings from consultation) received and
presented to Community Justice Partnership. 
Community Justice 
Page 128

Page 129

11 
Implement the prison Custody to Community
pathway, including performance reporting and
monitoring. 
Proposals for model of delivery agreed by Community
Justice Partnership, consultation with wider third sector
partners underway.  Commissioning additional third
sector support in relation to independent advocacy
underway.  Publication of the Scottish Government
Community Justice Outcomes and Performance
Improvement Framework delayed until 1st April 2023.
Finalise the review of our local Community Justice
Partnership. 
Significant progress has been made in prioritising and
streamlining the Partnership.  Due to the delay in
publication of the national Outcomes, Performance and
Improvement Framework, we will finalise during
2023/2024. 
Priorities Year 1  Progress
Develop joint Health Improvement plan between
Argyll and Bute and North Highland. 
A joint two-year Health Improvement plan has been
developed between Argyll and Bute and Highland, with a
view to delivering some pieces of work NHS Highland-
wide where appropriate.  The joint workplan was
developed using team workshops to identify priorities
and then small working groups to refine each topic.  As
this is a new joint development, it will be monitored for
effectiveness.  The aim is to improve collaboration and
working relationships, share learning and streamline
pieces of work where relevant. Local context will always
be considered within each workstream.
Pandemic recovery - Social Mitigation Strategy:
child poverty; financial inclusion; children’s rights;
equalities; mental health improvement and
support. 
The public health team contribute to the Child Poverty
agenda through the Argyll and Bute Child Poverty Action
Group and the Argyll and Bute Financial Inclusion and
Advice Group.  We have delivered Money Counts training
to a range of health, social care, and 3rd sector staff. 
Deliver on the 5-year implementation plan for
Living Well strategy: workforce development; self-
management; community link working; physical
activity; mental wellbeing; suicide prevention;
smoking cessation. 
Public Health and partners (including Argyll and Bute
HSCP, Argyll and Bute Council and 3rd sector) continue to
deliver on the 5-year Living Well strategy implementation
plan.  A mid-strategy report was published and
disseminated.  This report celebrates the wealth of work
undertaken by Living Well partners, the Living Well
Networks and via the Living Well capacity building fund
over the first 2.5 years of the strategy. It also allows us to
reflect on the challenges of the COVID-19 pandemic and
how this impacted on self-management and our
communities. Finally, this report looks ahead to the
future of Living Well and the importance of its links to the
Argyll and Bute Health and Social Care Partnership (HSCP)
Joint Strategic Commissioning Strategy (JSCS) and Joint
Strategic Plan (JSP). 
Public Health 
Page 129

Page 130

12 
The 5-year implementation plan has been reviewed and
focused steering group meetings have been agreed to
progress any outstanding pieces of work.  The Living Well
steering group continue to meet bi-monthly.
Building capacity for health improvement:
education; Living Well Networks; community
planning; locality planning groups; engagement;
place-based work. 
The Public Health team continue to build capacity for
health improvement in partners and our communities. 
Our Living Well networks hold quarterly meetings within
their local areas which are well attended by members of
the community, Third Sector and Statutory sector. In
addition, communications, surveys, consultations etc
from various sources (e.g. Public Health team, Locality
Planning Groups, Third Sector) are sent out by email and
social media via the Networks. 
The Public Health team regularly attend Area Community
Planning Groups, relevant thematic Community Planning
groups and Locality Planning groups to build capacity for
health improvement and coproduction. 
The Public Health team host bimonthly education
sessions open to HSCP staff and Third Sector. Recent
sessions included survey design, Versus Arthritis,
gambling harm and the Shaping Places for Wellbeing
programme.
Respond and deliver national strategy and targets
– suicide prevention; smoking cessation; Fairer
Scotland. 
The Smoking Cessation team within Public Health
continue to deliver a service across A&B that targets the
40% most deprived communities but is available to all
residents. The targets set by Scottish Government for
NHSH are reviewed regularly to ensure the optimum
progress is made towards achieving these. The team are
also employing their expertise in working with clients on a
1-1 basis to raise awareness of screening opportunities in
line with strategy from the Scottish Government. 
The Public Health team supports the delivery of the local
suicide prevention action plan working with the suicide
prevention group.
Alcohol and Drug Strategy actions – reduce drug
deaths; recovery orientated support.
Alcohol and Drug strategy actions are reported under the
Alcohol and Drug specific priorities. 
Priorities Year 1  Progress
Unscheduled Care (USC) leadership post in place.  Recruitment of Programme Manager start date April 2023.
Localities will have agreed actions plans to
support the two key areas of improvement.
No we re-focused this as an area wide plan rather than on
localities.
Plan and progress spend on the recurring A sub group has been established to oversee spend in     
Right Care Right Time 
Page 130

Page 131

13 
funding from Scottish Government.  relation to Key Performance Indicators, this reports to USC
Steering Group.
Established working groups with capacity to
progress change and support localities. 
Three sub groups established: Enablers, Community Teams
and Discharge without Delay. Focusing on key priorities.
Programme Manager will support.
Enhancing multi-disciplinary community teams
to be responsive, flexible, highly skilled,
continually assessing with a re-abling and
rehabilitation ethos and high quality end of life
care with the skills to provide simple care that
currently involves a hospital admission.
This will relate to the work of the Community Teams and
the care at home strategy group. There is also overlap with
the development of the palliative care section of the older
adult strategy.
Enhance clinical education for all staff develop
skill mix, apprenticeships and health care
support worker skilled roles. 
The updated action plan developed by the Community
Teams from the Community Standards will be supported in
implementation through the Enablers sub group. This
forms part of the Enablers sub group.
Provide enabling care at home that is effectively
commissioned and planned for those who need
it, with enough capacity to be provided following
assessment at home and at the point of need. 
A Smarter Commissioning Process has been developed.
Assessment of unmet need is ongoing there is a clear
process of reviewing unmet need. Longer term focus on re-
ablement and care at home modelling is required and
being considered through the Care at Home Strategy
development.
Performance metrics regular reported on. Key Performance Indicators have been developed and will
link with the Integrated Performance Framework.
Evaluate spend on community teams, unpaid
carer services & short breaks, response services,
care at home, community palliative care and
NHS GG&C delayed discharge.
For year 2
Consider models for community services with
the aim of minimising different services/staff
visiting people in community and improving flow
through hospital.
As above- linked to Community Teams and Social Work
Action plan through the review of Community Standards. 
What do our communities want to increase
support unpaid carers? 
Engagement on short breaks-looking for short break
support at home.
What do communities want from HSCP
community teams?
Limited engagement so far. 
Agree model that assist us to move towards a
National Care Service.
Partly related to Getting It Right For Everyone. 
Priorities Year 1  Progress
Support care at home through a challenging
winter, linking unscheduled care elements to
limit duplication and make best use of the total
resource available. 
Extensive efforts have gone into both reporting and
assuring on care at home services including the
development of mobile teams to meet unmet need.
Smarter Commissioning is being rolled out with providers.
A review of this process will provide information required
on resource availability and whether this way of working is
beneficial to service users and staff. It will also ensure that       
Adult Care –Older Adults/Adults and Hospitals 
Page 131

Page 132

14 
all providers are working collaboratively to deliver the most
effective and efficient service possible and will feed into
the tender process due next year.  A redesign of care at
home with relevant support from other disciplines is
required.
Develop a care at home strategy to agree and
monitor key developments to build a flexible and
sustainable service. 
Work has been undertaken to scope the main elements of
the care at home strategy which needs to link with internal
redesign and timescales for developing the care at home
contract.
Develop an Older Adult Strategy.  We have worked on a number of areas of the strategy
focusing on:
 Care Homes and Housing
 Palliative and End of Life Care
 Care at Home
 Right Care, Right Time
 There have also been links to National areas of strategy
 Strategy needs completed and consulted on.
Develop a robust plan around winter planning,
mapping out all elements of service delivery,
what the pressures are and how they impact on
each other. 
We submitted a Winter Checklist to the Scottish
Government in November 2022 and a winter plan was
developed for Argyll and Bute. 
We reviewed our operational and governance structures
for winter planning and pressures and with refinement we
should retain this structure and process for 2023-2024.
Work in partnership with providers, supporting
elements such as recruitment, training to ensure
best use of resources. 
Additional human resource support has been identified to
link recruitment and retention processes with all care
providers – internally provided and externally
commissioned by the HSCP. These posts will also link to the
wider corporate regeneration agenda for Argyll and Bute.
Review the use of Extended Community Care
Teams (ECCT) and link them to other community
services.
A review was completed however its scope did not allow
for an examination of a changing role for ECCT. This needs
to link with redesign of care at home.
Complete a building appraisal for internal care
homes and develop an overarching care home
and housing strategy. This will include the
position of intermediate care within Argyll and
Bute.
The building appraisal has been completed for internal care
homes and a Short Life Working Group on repairs is looking
to prioritise repairs. Demand modelling was undertaken.
The strategy requires further work.
Complete a needs assessment and collaborative
health and social care plan for Coll, as a template
for island approaches.
This was completed by the Coll Collaborative Group. Key
learning needs to be rolled out to other island
communities. 
Priorities Year 1  Progress
Development of A&B specific Learning Disability
and Autism Strategies, in line with the A&B HSCP
Engagement Framework. 
Initial scoping work was undertaken, however this
required to be paused due to capacity issues. Temporary
post currently advertised to lead on the development and
implementation of Neurodevelopment Strategy with a
full lifespan approach.  
Review and redesign of Learning Disabilities Day Stage 1 of the Review and Redesign on Day Services now           
Learning Disabilities 
Page 132

Page 133

15 
Services across A&B, working in partnership with
H&SC staff, care providers, service users, carers
and wider communities to develop future models
of support. 
complete. Redesign of Staffing Structure for Internal
Registered Services completed in 2022, with remaining
vacant posts currently being recruited to. Stage 2 – the
development of services currently ongoing and will be
carried over to Year 2 and Year 3 as part of the 3 year
action plan for services.
Implementation of the actions set out in the
Learning/Intellectual Disability and autism –
Recovery and Transformation Plan.
This is no longer considered a specific priority for the
HSCP. Any outstanding actions will be considered as part
of the Neurodevelopmental Strategy.
Continue to utilise technology and telecare where
appropriate to increase independence, whilst
ensuring the safety and wellbeing of service
users. 
Ongoing – utilisation of technology and telecare where
appropriate has resulted in the removal of many
sleepover provision across A&B in order to increase
service user independence. 
Priorities Year 1  Progress
Progress planned developments associated with
Transforming Together agenda for mental health. 
Core and cluster has not progressed for mental health
services, this needs dedicated project support and
commissioning to progress.
Community Mental Health Services review and
outcomes. 
The 2018 review outcomes continue to progress such as
developing a Mental Health directorate, Consultant
sector/locality model, developing Primary care teams and
crisis interventions. This agenda was paused through
Covid and will be refreshed to ascertain the aspects and
recommendations remain outstanding.
Psychological Therapies (PT) – we are working
with the Scottish government to develop a
business case to enhance and develop our PT
services across A&B and to assist us to meet the
expectations and demand for services in a timely
and effective manner. The teams are now
realigning to make an A&B wide service under
one management structure to ensure better
oversight of waitlist and service delivery at tier 3
and 4.
We continue to work with the Scottish Government to
develop services and capacity planning to address waiting
times. In the past 2 years we have realigned Psychological
therapies for tier 3 and 4 to develop a team with
appropriate governance, oversight and ownership. We
recruited a Consultant Psychologist and strengthened the
relationship with the Director of Psychology in NHS
Highland. The business case was submitted and we
continue to apply developing capacity models and
standards currently under development.
The primary care mental health team have also
realigned to work across GP surgeries and to
support those presenting with mild and moderate
mental health concerns. This team have a
Multidisciplinary Team approach and have a
wellbeing nurse, Occupational Therapy (OT),
guided self-help worker and primary mental
health worker in each locality.
This is complete and the teams are embedded in each
locality. Helensburgh and Lochside are served via a
Service Level Agreement (SLA), additional resource was
provided to the SLA to secure an OT and wellbeing nurse
within their delivery model. The next stage will be
determined by the Mental Health and Wellbeing in
Primary Care agenda and directives awaited from the
Scottish Government.
Care Reviews.  The reviewing team were required to be redirected to
Adult support and protection, however care reviews and
care packages are under review by our local teams and
through the Care Resource Group process.
Inpatient services – addition of a consultant This Consultant post has just become vacant and in the    
Mental Health 
Page 133

Page 134

16 
psychiatrist for the inpatient unit 3 days per week.
Recruitment of Registered Mental Nurses remains
fragile due to the national shortage and the
inpatient environment holds large vacancies,
support around recruitment and retention 
is well under way across 
NHS Highland. 
process of being re-advertised. We are attempting to
source a locum in the interim period, and cover is being
provided by our sector General Adult Psychiatry 
Consultants. The inpatient ward remains very fragile,
recruitment continues to be very challenging. We secured
retention and recruitment premium of £5k per annum to
offer Band 5 RMNs to maximise recruitment opportunities
alongside the offer of shared accommodation in our
newly refurbed flats, however uptake to date has been
nil. Concentrated targeted communications and
advertising is ongoing to maximise our options.
Additionally, last year we developed our earn to learn
scheme, this scheme is in collaboration with open
university whereby we have recruited new Health Care
Workers specifically to train. This pilot has gained interest
and is being piloted in Tayside also, we hope to offer a
further 3 places this year to continue succession planning. 
Priorities Year 1  Progress
Establish immunisation teams to administer
vaccines in all localities and assess recruitment
priorities based on the impact on workload of
delivering Covid vaccines and the additional flu
vaccine cohorts.
Majority of vaccinations will be carried out by HSCP
nursing teams by March 2023.
Full flexibility for island practices to continue to provide
vaccinations.
Develop an HSCP model for travel health and travel
vaccinations.
Service Level Agreement with community pharmacists
has commenced in some areas.
Recruit to primary care nursing posts as agreed in
the Primary Care Modernisation Implementation
Plan to support community treatment and care and
some aspects of urgent care.
In progress
Implement transitional arrangements where
practices continue to provide some services.
In progress
Provide information of what services will not
transfer from GP practices as an outcome of the
rural options appraisal process. The Scottish
Government and Scottish General Practitioner's
Committee of the British Medical Association
(SGPC) will negotiate a separate arrangement
including funding for these practices who will
continue to provide services after 1 April 2022.
Agreement reached; discussions with the rural practices
ongoing.
Contribute to review of sustainable services on the
island of Coll.
Ongoing    
Primary Care 
Page 134

Page 135

17 
Priorities Year 1  Progress
Post-covid recovery.  All current clinics have recovered, but there remain staffing
pressures due to covid related absence. Staffing levels are
tight, but we remain flexible and will rearrange staffing at
short notice to accommodate clinics. There are rare times
when due to staff illness this is not possible.
Restarting all non-urgent care.  All no-urgent care restarted. Significant waiting times but
in line with rest of Scotland. This has no bearing upon
General Dental Service Provision.
Identification of service needs and associated
development. 
Service need identified: Kintyre and Mid Argyll area. There
is limited provision for Personal Dental Service (PDS)
services in these areas. Redesign of service provision to
allow flexibility and greater provision of dental care in this
region for priority groups.
National Dental Inspection Programme provision, which is
mandated by Scottish Government is challenging. Clinical
staff are being used to fulfil this at present
Development of current services for Island
communities and priority groups. 
Discussion with General Dental Practitioner Islay regarding
contracting to provide PDS careScoping Mobile dental
service (limited provision) and in collaboration with Coll
and Colonsay Communities.
Tiree dentist and DHT visiting Coll regularly. Mull clinic
remains extremely busy. Over 3000 patients registered.
Long waiting list. Only service provider on the island15 of
17 care homes have nominated dentist. (Islay and
Campbeltown – Islay potential for GDP to take over). 
Advanced care options for priority group’s patients –
General Anaesthesia or Intravenous (IV) sedation services
for complex care cases/anxiety cases. Currently no
provision for this within A&B staffing cohort. External
referral to NHSH North or GGC is only route for these
patients. 
Increasing access for patients in assisted and
looked after accommodation settings. 
Domiciliary dental care has resumed. Caring for Smiles
Programme for Care Home staff has resumed. 14 care staff
signed up to take qualification. Oral health care shop to
provide oral healthcare items at cost price to care homes
piloted and successful.
Increase skill mix in association with in-house
training and also NHS Education Scotland
partners. 
AWI training offered to all dentists. A either qualified or
allocated to training. Inhalation sedation training to
Helensburgh, Dunoon and Oban. Associated support staff
identified for training.
Clinicians peer review group meetings – Continuing
Professional Development
Motivation, Action and prompts (MAP) behaviour change and
Oral Health improvement training for all Public Dental
Service sites.
Team building.  Regular team meetings and 1 to 1 meetings as standard.
Senior Management Team to Mull for team building  
Dentistry  
Page 135

Page 136

18 
exercise
Standardising processes.  Single point of referral in final stages with Scottish Care
Information (SCI) gateway
Standard Operating Procedures.
Fixed term recruitment in Orthodontic services.  Unable to recruit. Accessing Consultant services on temp
contract (weekends currently). Looking at agreement with
NHSH North for permanent solution for weekday clinics. 
Scoping of in-house development of SDO for
Orthodontic services.
Senior Dental Officer development underway. Mentoring
by Consultant in NHSH North
PAYs in establishment take to advert to increase
staffing numbers. 
Complete. Meeting with finance in 2 weeks to review.
Capital funding application for service
improvements.
Capital funding applications being prepared Tiree, Mull,
Mobile Dental equipment.
Co-located sites, increase communication with
corporate bodies and GDP services.
Lines of communication open to facilitate good working
relationships. 
Priorities Year 1  Progress
The ADP strategy.  The work of the ADP is informed by a strategy that
covers the period of 2020-2023. The strategy has 4
pillars:
1. Prevention and early intervention
2. Developing recovery-oriented systems of care
3. Getting it right for everybody
4. Public health approach to justice
Updates on some of the work covered under this
strategy is provided below however the majority of
updates are provided under the remaining ADP
priorities below. 
Planet Youth
The ADP provided funding for two secondary schools
to take part in the Planet Youth approach to
substance use prevention through a community
collaborative approach. Planet Youth surveys were
used to inform strategies within each of the schools
and communities. This baseline data is important for
measuring the impact of this approach and will allow
schools to identify priority areas for development. 
This work is ongoing and additional funding will allow
this to be rolled out to further secondary schools. 
S3 Drama “You Are Not Alone” 
The ADP continues to contribute funding to the S3
Drama which is delivered across secondary schools in
Argyll and Bute.  This has continued to be delivered
via a filmed performance. The performances provide
an opportunity for young people to engage in          
Alcohol and Drug Partnership (ADP)
Page 136

Page 137

19
questions, understand support that is available and
connect with other services.  Planning for the return
of the live performance for March 2023 is already
underway.  The ADP also offer professional learning to
education staff in relation to substance misuse to
support staff in the development of high quality and
relevant PSHE programmes. 
The ADP work in line with the strategy and a strategy
refresh for 2023-2024 is being developed following a
successful ADP strategy day in February 2023.
Initiate MAT standards.  The Drug Deaths Taskforce was set up in September
2019 and prioritised the introduction of standards for
Medication Assisted Treatment (MAT).  The aim is to
reduce deaths, and other harms and to promote
recovery.  The standards provide a framework to
ensure that MAT is sufficiently safe, effective,
acceptable, accessible and person centered.
In discussion with the MAT standards Implementation
Support Team (MIST), partners produced a project
specification document to initially implement MAT in
Cowal & Bute.
Dedicated co-located teams will work in partnership
to provide appropriate and evidenced access to
medication assisted treatment that promotes harm
reduction and a whole person approach.
The MAT steering and implementation groups
continue to meet regularly to progress the
implementation of the standards in Cowal and Bute. 
Learning from this will be used to scope roll out to
other Argyll and Bute areas, a process which is
supported by Public Health Scotland and Healthcare
Improvement Scotland.
Increase access to residential rehab.  A new residential rehabilitation pathway has been
developed for use in Argyll and Bute, to support those
seeking residential rehabilitation and/or
detoxification. This was developed via a Residential
Rehabilitation Group, which was formed to ensure all
partners who would be involved in care and support
before and after residential rehabilitation would be
involved in the discussions to enable clients to
maintain the benefits of residential rehabilitation. 
This is a partnership of third sector, NHS and Council
member.  Historically referrals to residential
rehabilitation were made only to Phoenix Futures in
Glasgow and Kings Court in Tighnabruaich, the
number of organisations that can be referred to has
increased.
The pathway encourages pre and post rehabilitation
Page 137

Page 138

20
support to maximise support for the individual. In
financial year 2021-22 eighteen people were
approved for residential rehabilitation and/or
detoxification, twelve were men and six were women.
Develop a revised approach for children and young
people’s support. 
The existing school-based support service continued
to deliver throughout 2021/22.  There was evidence
that the interventions resulted in improvements in
young people’s lives and had a positive impact on
families.
A needs analysis was carried out in 2021 by an
independent organisation to map and match current
service, identify service gaps and adapt or commission
new services to meet the identified needs of young
people across all communities.  Work is ongoing to
respond to the needs identified.
Initiate the whole family approach strategy.  Argyll & Bute’s first Family Support group was
established, with the support and funding from the
ADP, in Helensburgh in October 2018 by two family
members with experience of caring for and living with
someone with drug and/or alcohol dependency
issues.  With their support, a second group was
established in Dunoon. Work is ongoing to implement
the Whole Family Approach across all localities of
Argyll and Bute.
Increase access to advocacy.  A partnership was established by the ADP involving
Lomond & Argyll Advocacy Service, Scottish Recovery
Consortium and Reach Advocacy to train people with
lived experience as Peer Advocates (recovery
advocacy peers).  The partners successfully recruited
and trained 4 individuals from across Argyll and Bute
as Lived Experience Advocates.  All four successfully
completed the Reach Advocacy Rights Based
Approach SQA Advocacy Award. Advocates work
closely with the substance use support teams in
localities supporting the needs of their communities
and encourage people to access the types of supports
that enable their recovery journeys.
Lomond and Argyll Advocacy Services will play an
important role in the delivery of MAT Standards in
Argyll and Bute and the recovery advocacy Team will
also all complete interview training, interviewing
service users about their experiences of MAT.                                           
The Group Recovery Advocacy’s work has been
valuable and the voices of people in recovery have
helped shape some developments and improvements
within Argyll.  
Scottish Recovery Consortium aim to establish a
Page 138

Page 139

21 
National Network of Peer Advocacy Services and will
look to Argyll and Bute as a model of good practice. 
The combination of national and local based partners
helped secure the funding for this project and it is
hoped the establishment of a National Network will
help develop and support this service as we move
forward.
Work with criminal justice to create a continuation of
shared care. 
The ADP, in partnership with Community Justice,
Criminal Justice, Police Scotland and We Are With
You, established a Police Custody to Community
pathway for people who wished to speak to a
member of staff from We Are With You.
The offer of support is not limited to those with
identified needs associated with their use of alcohol
or drugs but, by using the ADP Recovery Orientated
Systems of Care (ROSC), can link into a wide range of
services and opportunities.  We Are With You function
as a first point of contact and link people into the
appropriate service providers on their release from
custody. 
A pathway has been developed to allow continuation
of care and Opioid Substitution Treatment (OST) for
someone who is entering prison.  If an individual is
admitted to prison, there is contact between the
prison and the service prescribing OST to confirm
both the prescription and the willingness of the
service to continue this on release.  Due to the
challenges of the pandemic, this pathway requires
review.
The ADP and Community Justice continue to work on
the development of the pathways for those people
leaving Prison and returning to Argyll & Bute.  Central
to this is the need to ensure all are provided with
Naloxone on liberation and continuity of care where
OST is prescribed.  Argyll & Bute prisoners can be held
in a range of prisons and work is ongoing to ensure an
equitable approach.  Prior to release from prison,
contact is made to substance use service providers in
order to continue with any clinical treatments in the
community. This has worked well for the continuation
of prescribed methadone and buprenorphine.
Page 139

Page 140

22 
Priorities Year 1  Progress
Continue to develop standard tools and process
for establishment setting ready for cycle three.
Agree establishments for A&B teams. 
First cycle reported to SLT and supported with investment
and service redesign requirements over next year. Cycle
two planned spring 2023. Health & Care Staffing Act
implementation in 2024.
Develop a dashboard for visible demand and
activity data for AHP teams. 
Work underway with Performance Management Team.
IMPF submission for AHP’s complete.
Working on process for collating all AHP minimum data
for analysis.
Work with MS365 for daily activity App
Scope offer of first contact physiotherapy to
remote and rural practices.
Project progressed with fixed-term band 7 physio to
establish plans for smaller practices. Currently 16 out of
31 practices have FCP service which is 80% of Argyll and
Bute’s total Population
All AHP staff to do Health Behaviour Change
training and review the professions offer to
prevention.
Training offered, 6 AHP attended, plan in place to recruit
further staff for TURAS module.
Service pressures have impacted.
Review of recruitment within AHP professions and
enhance skill set opportunities g. Increase
number of advanced practice roles, therapy
assistant support to qualify as an AHP. 
New admin & assistant roles being trialled in Occupational
Therapy, Podiatry, Learning Disabilities and Paediatrics.
No progress with work-based professional
apprenticeships due to national issues. Increasing number
of overseas recruits. 
Priorities Year 1  Progress
Continue to work closely with our Carer Centre
Services to deliver on A&B Caring Together Strategy.
We continue to meet regularly, attend training and
development events.
We will develop a Carer APP which will assist in the
sharing of information and provide guidance to
carers. 
Young Carer App developed and now in use.
There will be a learning and development plan to
support implementation and knowledge of the
Carers (Scotland) Act.
In progress
There will be multi-agency guidance for our
workforce on identifying, supporting, listening to
and involving Carers during the planning of services
and recognising their involvement as an equal
partner in care. This will include guidance on how we
communicate and work together.
Developed and out for feedback. Will be in place by end
of April.
Develop and implement processes to ensure that
Carers Support Plans, Young Carers Statements, and
Emergency Plans are completed, and the
information is shared across all services as agreed.
Completed
We will increase Communication and engagement;
ensuring carer’s voices are heard. Produce an
In Progress      
Allied Health Professionals (AHP) 
Carers 
Page 140

Page 141

23 
Engagement framework.
We will work collaborative with Carers and Carer
centres to create a Carer Pathways. 
Completed
We will work to develop guidance to support carer
visibility and involvement prior to hospital discharge.
Completed , Poster, Leaflets
Review and update of our Caring together strategic
plan.
Delayed as awaiting the new National Carer Strategy. 
Increase our involvement with education and raising
Young carer Awareness.
Brought forward from year 2 completed. 
Priorities Year 1  Progress
Establish Health Behaviour Change training within
the HSCP. 
Health Behaviour Change training has been rolled out 
Communication & engagement plan developed and
rolled-out. 
Changed to Co-production of Community assets
(Strand 2 of programme) 
A co-production plan has emerged with partners in Live
Argyll, Argyll & Bute Council, MacMillan & Third Sector
Interface. We are engaging with Living Well Networks and
Locality Planning Groups. Co-production planning is
arranged top focus on delivery of the Living Well Strategy
priorities with a focus on building community assets.
Collate ideas to increase prevention and early
intervention in preparation for National Care
Service roll-out. 
(Strand One of programme) We have drafted an options
appraisal around developing a 12 week Wellbeing &
Physical Activity programme and are progressing to
exploring funding opportunities. 
Priorities Year 1  Progress
Implement the new ECLIPSE IT system and increase the
number of community health staff using the single
health and social care IT system.
On course for completion May/June 23.
Join up our HSCP teams by improving NHS systems and
Council systems for easier data sharing. Enhance
communication and collaboration using MS Teams
federation.
Phase 1 of federation completed. Provides instant
messaging, calendar access and presence
management. Phase 2 of this national project
timescale still to be agreed
Complete the final phase of our “Drone” beta service
for clinical logistics in the West of Argyll leading
national innovation in the use of this technology in the
Scottish Health service. 
Phase 1 and 2 complete. Phase 3. In essence this is a
6 month “Beta test” with a live logistics delivery
service programme. This would be the final stage of
establishing the integration of “beyond visual line of
sight” (BVLOS) drones into our normal clinical
logistics transport network.      
Digital Health and Care Strategy 
Prevention Programme 
Page 141

Page 142

24 
Priorities Year 1  Progress
Work on finding a digital solution within the pilot
area. 
Digitally ready devices are being rolled out both as and
when clients switch to a digital line and for all new
clients in the Oban and Mull areas. 
Continue to promote digital care across the HSCP
ensuring no digital exclusion in Argyll & Bute. 
We continue to promote our service utilising
newsletters, roadshows etc and working alongside
colleagues to ensure familiarity with digital care
solutions available. Digital exclusion is still an ongoing
issue and will be nationally, we know for some of our
more remote residents eg those living on the islands
this is a risk and we are working with the LPGs, Living
Well Coordinators etc to ensure this is minimised.
Ensure TEC is a core service embedded in all aspects
of delivery of care. 
We are working to ensure TEC is wrapped round our
patients and clients at every stage of care delivery. We
have Technician presence at MDTs, virtual ward
meetings etc. we are cross referencing hospital
admissions with TEC clients, which allows us to
prioritise those most in need. 
Encourage promotion of all services throughout
patients/clients journey. 
We recognise the changing need of patients and clients
as they journey through services, we are working to
promote remote health monitoring across primary
care, TEC based solutions when patients require
secondary care and ensure this support is ongoing.
Supporting colleagues to feel more comfortable
using TEC available as a resource to support their
delivery of care and free up time for direct patient
care. 
We continue to work to upskill colleagues to work with
TEC. Examples of this are the work we are doing to
address those on the unmet need list, working with the
Mental Health teams to direct referrals into the
Silvercloud programme. Frequent callers will be
highlighted.
Continue to develop NHS Near Me clinics to support
clinicians in delivering remote clinics and supporting
patients to attend appointments without the need to
travel. 
We are promoting the use of Near Me wherever
possible, working with the islands in particular as part
of the Digital Hub development. Promotional materials
are being heavily utilised to increase awareness of the
option to have consultations and appointmens via Near
Me, especially when these are to occur in Glasgow
sites. 
Priorities Year 1  Progress
Identify estate rationalisation opportunities as part of
Councils “Our Modern Workspace” project. 
This work is ongoing within the Council with the creation
of “Working from Home” policies to support new ways of
working.
Implement the new ECLIPSE IT system and increase the
number of health staff using the single health and social
care IT system.
On course for completion May/June 23.
Join up our HSCP teams by improving NHS systems and Phase 1 of federation completed. Provides instant     
Technology Enabled Care (TEC) 
Coporate Services   
Page 142

Page 143

25
Council systems for easier data sharing. Enhance
communication and collaboration using Microsoft Teams
federation.
messaging, calendar access and presence management.
Phase 2 of this national project timescale still to be agreed.
Obtain funding and expand our electric vehicle charging
point infrastructure by 30 and our electric vehicles by 35.
The HSCP will have installed 30 additional charging points
across A&B and has placed an order for 53 Electric
vehicles.
Complete the final phase of our “Drone service” beta
service for clinical logistics in the West of Argyll leading
national innovation in the Scottish Health service. 
Phase 1 of this project, a proof of concept, was conducted
in June 2020 Phase 2 piloting a “live” service in February to
May 2021 covering Mull and Iona Community Hospital,
Easdale Surgery, Mid Argyll Community Hospital and
Integrated Care centre Lochgilphead and Lorn and Islands
Rural General Hospital Oban. Following the success of
these previous phases, the Unmanned Drone Logistics
project is moving to its final critical test stage – Phase 3. In
essence this is a 6 month “Beta test” with a live logistics
delivery service programme. This would be the final stage
of establishing the integration of “beyond visual line of
sight” (BVLOS) drones into our normal clinical logistics
transport network. Skyports has obtained funding from
the European Space Agency and the UK Space Agency to
operate this service under a “Transponder Mandatory
Zone” (TMZ) airspace structure which would be the first in
the UK to be used for BVLOS medical deliveries. What this
means is that crewed and un-crewed aircraft such as the
drones operating in this project can fly together in
unsegregated airspace. This allows us to move away from
restricted air corridors which other aircraft cannot access
while greatly improving the integration of un-crewed
aircraft into current airspace structures. This integration
piece is the crucial ‘unlocker’ of permanent BVLOS drone
medical deliveries in the UK.
Page 143

Page 144

26
Performance Management and
Governance 
Introduction
This year has seen the move from the post-COVID remobilisation of services using the
designated Framework for Clinical Prioritisation to focussing on the management and
reduction of Long Waits and preparation for winter pressures.  From October onwards
health and social care services across Scotland experienced an extensive increase in the
prevalence of Flu, Covid19 in addition to expected winter illness and system pressures. 
As such the Scottish Government Health Department directed HSCPs to focus on additional
actions and performance measures to look at the impact of additional funding and address
these pressures. A National Response Group was established to monitor and drive
improvement with regards to the reduction of Delay Discharge across Scotland to support
the acute inpatient pressure and enhance flow patient through hospitals. Both HSCPs and
Health Board were required to adopt five key action areas to address these pressures,
alongside monitoring and reporting of additional performance measures to evidence impact
and support progress.
The five areas of focus were:
1. Delivering a different model of care for a short period, e.g. move to critical/life-
saving care only and postponing planned activity. 
2. Opening / procuring additional capacity in social care e.g. intermediate care beds. 
3. Moving staff to areas of pressure across acute and community and care services. 
4. Increased engagement with 3rd sector providers commissioning enhanced services
to address unmet care need and prevent admission. 
5. Lighter touch governance arrangements with regard to criteria for discharge and
inspections 
Integrated Performance Management Framework (IPMF)
The focus for 2022 has been the development of the Integrated Performance Management
Framework to ensure that the drivers for performance improvement are those that matters
most to the service both operationally and strategically.  The overall focus of the IPMF was
to establish a collaborative performance framework that offered improved performance
visibility across the HSCP and real ownership. This steps away from previous traditional
management of performance and replaces the Pyramid Balanced Scorecard, the IPMF is
scheduled to go-live in April 2023.  The new governance arrangement will mean that future
performance reporting will be scrutinised by the Clinical & Care Governance Committee
Page 144

Page 145

27
The monitoring and reporting of performance using the IPMF ensures the
HSCP is able to deliver against key strategic priorities, national data
demands and the Strategic Plan objectives and service priorities;
Key Performance Overview  
This overview uses calendar year (Jan- Dec) for 2022, this ensures that there
is data continuity linking previous and new reporting using full year data. Latest
performance against the IJB Scorecard measures is presented at Appendix 1. Note this is
impacted by unavailability of data – we are awaiting advice from Public Health Scotland
(PHS) on the publication and use of National Indicators reported within the Health and
Wellbeing Outcome Indicators (HWBOI) and Core Suite data. PHS has confirmed 2022
update will not be available until Jun 2023 earliest. PHS also advise that Ministerial
Steering Group data is impacted by Scottish Morbidity Record (hospital episode /
admission records) completeness across a six month lag period, therefore any data
reported within this lag period should be treated with caution. 
Benchmarking
Benchmark performance makes a comparison with the seven identified rural HSCP’s and
against the Scottish average. Performance across the 20 HWBOI, Argyll & Bute HSCP noted
** (**%) indicators performing above the Scottish average. Performance against the other
HSCP’s for these indicators notes that Argyll & Bute had an overall **% success rate
(Appendix 2) 
** Note we are awaiting further advice from PHS on publication and use of National
Indicators reported within the HWBOI and Core Suite data. PHS has confirmed 2022
update will not be available until Jun 2023 earliest. 
Waiting Times & Long Waits
On average the overall number of people on the Out Patients Waiting List (OPWL)
has seen an increased by 36% across 2022 against previous years data. This is
show in terms of a monthly increasing trend across the year, with the lowest
recorded in February (n=1268) against a peak of (n=2130) for December   
Across 2022 the overall number of people on the OPWL breaching beyond 12 weeks has
increased by 150% for 2022 against previous years data. This is represented by monthly
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 1364 1268 1500 1466 1627 1783 1926 1866 1870 2035 2026 2130
2021 1266 1211 1122 1290 1259 1287 1316 1311 1314 1357 1284 1323
0
500
1000
1500
2000
2500
New OPWL - 2021 & 2022
2022 2021 Linear (2022)
Page 145

Page 146

28
increasing trend across the year, with the lowest recorded in February (n=286) against a
peak of (n=750) for December. 
The overall number of people on the OPWL Long Waits breaching beyond 52 weeks has
decreased by 69% across 2022. This is reflected by a monthly decreasing trend across the
year with a peak of (n=13) for January and the lowest recorded point in December (n=4). 
Homecare
For  2022 there was a 2.7% increase across the year with regards
to the total number of homecare hours against the previous year,
this was offset with a slight reduction in the average number of
homecare clients in receipt of a service. Peak months for the
delivery of the homecare hours were March to July with a
reducing trend from July (n=103,574) to November (n=95,841). 
Trend analysis for 2022 with regards to overall number of
homecare clients in receipt of a service noted an increasing trend from February (n=1481)
peaking in July & August (n=1588). From August there is a rapid decrease in the overall
number dropping to (n=1482) in December. 
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 300 286 317 335 369 435 448 415 504 563 579 750
2021 471 427 299 302 272 245 244 277 311 323 276 309
0
200
400
600
800
New OPWL Breaches > 12 Weeks - 2021&22
2022 2021 Linear (2022)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 1,509 1,481 1,494 1,510 1,534 1,548 1,558 1,558 1,525 1,522 1,492 1,482
2021 1,550 1,534 1,549 1,525 1,517 1,522 1,499 1,513 1,516 1,519 1,514 1,509
1,400
1,450
1,500
1,550
1,600  
Number of Homecare Clients 2021 & 2022
2022 2021 Linear (2022)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 13 6 6 4 9 10 10 9 5 4 7 4
2021 98 105 93 84 78 56 47 48 36 35 22 17
0
50
100
150
OPWL Long Waits  > 52 Weeks - 2021&22
2022 2021 Linear (2022)
Page 146

Page 147

29
Residential Care
Performance with regards to the total number of people in residential
care notes a relatively flat trend for 2022, with an overall 2% reduction in
the total number of people in a care home against previous year
performance. June to September suggests some potential seasonality in
the data with this year and the previous year sharing a reducing trend
across October to December 
Delayed Discharge
Delayed discharge performance for 2022 notes an increasing trend across
the year with a 53% increase in the average number of delays when
compared against data for 2021. Alongside this was a 66% increase in the
average bed days occupied by those delays.  Monthly performance noted
seasonal increases in March, October and December, this pattern is
replicated in the 2021 data. Statistically across each month the increase in
bed days occupied was not directly attributable to an increase in the overall
number of delays, peak months were July, October and December.  May
and June noted a small increase in the number of delays but with a
significant increase in the time beds were occupied. 
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 549 554 570 564 563 557 552 561 564 574 559 557
2021 598 594 611 611 569 548 558 556 557 553 556 546
500
520
540
560
580
600
620
Number of People
Months
Number of Care Home Residents 2022 & 2021
2022 2021 Linear (2022)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 478 388 434 419 435 475 734 687 586 894 663 860
2021 413 197 246 141 112 241 315 363 324 535 287 370
0
200
400
600
800
1000
Bed Days Occupied in Month 2021 & 2022
2022 2021 Linear (2022)
Page 147

Page 148

30
Adult Support & Protection
From the most part duty to enquire activity noted a very similar trend as the
previous year, with a variance increase in 2022 from May to August.  This
increase in activity was recovered from September onwards with both years
noting a slight decreasing trend for November to December.  On average duty
to enquire activity was reduced by 13% for 2022 as compared to 2021 and
with regards to Investigation and Risk Assessments completed, notes a 5%
increase for 2022 against the previous year. 
Resilience in Care at Home (Unmet Need) 
The reporting of unmet need commenced in August 2021 in line with a
weekly requirement from the Scottish Government. Part of this return
looks at the number of people waiting for a care package and the
associated hours. Average data for 2022 across the number of people
noted (n=64) for the year against an average of (n=591) hours.
Comparison with the previous year 2021 is limited due to the part year
data available. The trajectory for the number of people waiting noted a
slightly increasing trend, however there is not a strong correlation with
increasing weekly numbers of people and increases in associated care
hours.   
0
200
400
600
800
1000
3-Jan 3-Feb 3-Mar 3-Apr 3-May 3-Jun 3-Jul 3-Aug 3-Sep 3-Oct 3-Nov 3-Dec
Hours
Months
Number of People  & Hours of Care 2022
Number of people Hours  Linear (Hours )
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 19 36 32 30 21 31 39 45 23 29 49 32
2021 20 36 32 24 24 20 23 28 32 27 42 27
0
20
40
60
Numbers
Months
Adult Support & Protection- Duty to Enquire 
2021& 22
2022 2021 Linear (2022)
Page 148

Page 149

31
Children & Families
Overall numbers of assessments completed for 2022 noted a 7% reduction, with
a relatively flat trend across the year.  The data notes variance across the year
and an erratic and reducing monthly trend from May onwards. There is a
suggested impact of seasonality with regards to a reduction in activity across
school holiday time, June and July.
With regards to the overall number of Care Experienced Children there was a 6% reduction
for 2022 against the previous year average.  Monthly trend analysis noted for 2022 an
increasing overall trend from June onwards, peaking in August with a relatively flat
performance up to and including December.   
The numbers of children on the child protection register noted a
decrease against previous year activity.  The average for 2022
noted a 35% reduction against the data for 2021, with a drop in
activity across June & July, suggestive of seasonality and potential
impact of school holidays.  The data identified four distinct
periods of increased numbers of children on the register across
the year February (n=35), March (n=28), May (n=29) and August
(n=27), although general monthly numbers remain statistically
low.  February notes the highest number of children registered, against (n=21) in November.
Initial contacts data identified a reducing trend for 2022 against previous year, this equates
to an overall reduction of 12% against 2021 data. The data for 2022 noted an erratic
monthly trend with the most significant reduction in contacts from May (n=319) to (n=90) in
December. This trend is in direct opposition to the previous increasing monthly trend for
2021 data. 
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 146 146 143 145 144 143 147 151 147 145 143 145
2021 164 161 159 157 156 150 152 151 150 151 151 147
130
140
150
160
170
Number of Care Exeperienced Children 
2021 & 22
2022 2021 Linear (2022)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 33 35 28 27 29 24 22 27 25 22 21 22
2021 30 40 45 37 34 35 32 35 37 38 42 37
0
20
40
60
Number of Children on the Child Protection
Register- 2021 & 22
2022 2021 Linear (2022)
Page 149

Page 150

32
Community Health
The number of community assessments commenced in the month noted
a gradual increasing trend for 2022, with an average overall yearly
increase (8.5%) in the number of assessments commenced against data
for 2021.  Trends across the months highlighted the highest number of
assessments were in May (n=12,251), this is a 1.4% increase against the
highest recorded monthly number (n=12, 076) in 2021. Previous volatility
in the monthly 2021 data is offset by a more stable baseline in 2022. 
Adult Care
Adult care initial contacts noted an average reduction of 18%
against data for 2021, this was countered by a general
increasing monthly trend peaking in November (n=496) from
a baseline of (n=322) in January.  Trend analysis across both
2022 and 2021 noted more stability for 2022 against an
erratic decreasing data trend of 2021.  Conversion of initial
contacts to assessments highlighted a 24% overall average reduction for 2022 against the
previous year.  The trend across the year was relatively flat in trajectory, peaking in March
(n=263). 
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 322 361 429 387 438 405 410 410 402 445 496 360
2021 632 641 645 481 573 427 455 504 344 384 411 333
0
100
200
300
400
500
600
700
Adult Care Initial Contacts 2021/22
2022 2021 Linear (2022)
0
5,000
10,000
15,000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Community Assessments Commenced in the
Month  2021 &22
2022 2021
Page 150

Page 151

33
Technology Enabled Care & Falls 
Telecare performance for 2022 noted a 1.5% increase against the
previous year performance with regards to the actual number of
clients in receipt of a service. From Jan- May the overall trend was
flat, from June there was a sustained increase in numbers peaking at
(n=1955) in October against (n=1906) for the same month in the
previous year. 
On average the overall number of falls recorded within the context of a Technology Enabled
Care response reduced by 6% for 2022 against previous year data. The drop in overall
reporting was against a monthly increasing trend across the year with the lowest recorded
in January (n=46) against a peak of (n=83) for December. 
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 1921 1922 1910 1918 1917 1945 1942 1953 1947 1955 1951 1952
2021 1898 1916 1915 1930 1880 1906 1920 1924 1915 1906 1915 1922
1840
1860
1880
1900
1920
1940
1960
1980
Number of Clients in Receipt of Telecare 
2021 & 2022
2022 2021 Linear (2022)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 46 63 65 67 55 55 80 78 61 67 69 83
2021 69 77 94 88 68 76 67 72 60 63 46 59
0
20
40
60
80
100
Telecare Recorded Falls- 2021&22
2022 2021 Linear (2022)
Page 151

Page 152

34
Child & Adolescent Mental Health & Psychological Therapies
Whilst CAMHS performance for the year 2022 noted an overall reduction of 14% of people
on the waiting list compared with 2021, there has been an increasing trend in the latter part
of 2022, with months Sep-Dec reporting 53% increase against the August low point. 
On average the overall number of children on the CAMHS waiting list fell
by 14% for 2022 against previous year’s data. The drop in overall
reporting is against a monthly decreasing trend across the year with the
lowest recorded in August (n=71) against a peak of (n=263) for May. This
decrease reflects a period of systems data cleansing with a focus on
legacy PMS system recorded waits. 
On average the overall number of waits for Psychological Therapies rose by 19% for 2022
against previous years data. Overall reporting indicates a monthly decreasing trend across
the year with the lowest recorded in December (n=244) against a peak of (n=304) for
February
Winter & Systems Pressures
Since Jan 2023, Winter & Systems Pressures have been monitored in line with the SG
Integrated Performance Framework focussing on Resilience in Adult Social Care, looking
closer at patient flow through Urgent & Unscheduled Care, increased support for Interim
Care Home Placements, and improving the rate of Discharges without Delay. Argyll and
Bute’s current performance in these areas is presented in Appendix 3. 
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 212 239 224 257 263 168 142 71 90 97 101 109
2021 188 169 188 150 181 187 186 196 230 244 191 207
0
50
100
150
200
250
300
CAMHS - 2021&22
2022 2021 Linear (2022)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 293 304 291 294 294 288 296 290 289 266 244 244
2021 173 186 202 254 265 288 184 218 206 219 261 290
0
50
100
150
200
250
300
350
Psychological Therapies 2021&22
2022 2021 Linear (2022)
Page 152

Page 153

35
Financial Performance and Best Value 
Financial Performance
The IJB is committed to the highest standards of financial management and governance. It is
required to set a balanced budget each year and seeks to deliver Health and Social Care
Services to the communities it serves within the envelope of resources available to it.
Financial performance is reported in detail to the IJB at each of its meetings and to its
Finance and Policy Committee which meets on a monthly basis. It also publishes its Annual
Report and Accounts which are subject to independent external audit. 
This section provides a summary of financial performance for 2022-23, our approach to
ensuring that we deliver Best Value and outlines the future financial outlook and perceived
risks.
Financial Performance 2022-23
The IJB set a balanced budget for 2022/23, and is delighted to be able to report an
underspend against the resources made available to it during the year. This is an excellent
outcome as it enables the HSCP to progress key Transformation projects and importantly
helps it manage the financial challenges facing the health and social care sector in future
years. It is acknowledged that a number of factors contributed to this improved position
including delivery of savings, improved financial management and governance and
additional funding allocations from the Scottish Government. It is also the case that the
HSCP has continued to experience difficulties in recruiting staff during 2022/23 which has
contributed to the positive financial position but has resulted in on-going service challenges.
The final revenue outturn for 2022/23 was an underspend of £9.1m against the resources
available to the HSCP, which totalled £341m. This underspend has been retained by the
HSCP within its general reserve and it is intended that it will be invested in 2023/24 on
service transformation and will enable to HSCP to cover its budget gap in 2023/24 from
within its own resources. The following table summarises the financial performance against
budget analysed between Health and Social Work related services. 
Service Actual 
£
Budget
£
Variance 
£
Variance 
%
Social Work Services 89,184 92,740 3,556 3.8%
Health Services 242,496 242,497 5,542 2.2%
Grand Total 331,680 340,778 9,098 2.7% 
The budget for 2022/23 included a savings target of £6.1m, of this target £4.2m or 68% of
the savings programme was delivered.  This mean there are a number of savings projects
that the HSCP requires to deliver in 2023/24. It continues to manage its savings programme
rigorously and is committed to service transformation and to ensuring the sustainability of
the services it offers and its longer term financial sustainability. The HSCP has a new savings
target of £6.8m for 2023/24, delivering this, as outlined in the Value for Money Strategy, is
in addition to delivery of the £1.9m of savings not achieved in 2022/23. The HSCP has also
identified a number of other Value for Money priorities within its strategy including work
relating to the funding model for rural and island communities. 
Page 153

Page 154

36
Financial Outlook, Risks and Plans for the Future
The IJB has a responsibility to make decisions and direct service delivery in a
way which ensure it operates on a financially sustainable basis within the finite
resources available to it. There are significant on-going cost and demand
pressures across health and social care services as a consequence of demographic change,
new treatments, increasing service expectations and on-going high inflation. Managing
these pressures and funding uncertainty is becoming increasingly difficult, the real value of
budgets continues to be eroded by price and cost increases. There is on-going requirement
to improve efficiency, deliver savings and transformation plans. 
The HSCP continually updates its forward financial plans to recognise and plan for the
impact of new policy priorities, emerging cost pressures and funding allocations.
Additionally, robust risk management processes are in place which seek to identify and
quantify the financial risks facing the HSCP. Key risks currently facing the partnership include
the sustainability of service providers, the impact of inflation, staff availability and costs, and
increasing demand for services. A further key risk is in respect of the increased numbers of
people who are awaiting diagnosis and treatment. 
The Annual Report and Accounts for the year provide further detail and analysis in respect
of financial performance, financial risks and governance arrangements and improvement
plans. 
Best Value 
The IJB has a statutory duty to provide best value as a designated body under
section 106 of the Local Government (Scotland) Act 1973. NHS Highland and
Argyll and Bute Council delegate funding to the Integration Joint Board (IJB).
The IJB decides how to use these resources to achieve the objectives of the
strategic plan. The IJB then directs the Partnership to deliver services in line
with this plan. 
The governance framework represents the rules and practices by which the IJB ensures that
decision making is accountable, transparent and carried out with integrity and in line with
the principles of public service. The IJB has statutory responsibilities and obligations to its
stakeholders, staff and residents of Argyll and Bute. 
The Health and Social Care Partnership ensures proper administration of its resources by
ensuring that there is an appropriate governance framework in place and by having an
appointed Chief Financial Officer who is required to keep proper accounting records and
take reasonable steps to ensure the propriety and regularity of the finances of the
Integration Joint Board. The IJB is also required to publish audited annual accounts each
year. 
Best Value underpins the ethos of governance and financial management within the IJB, a
summary of performance against the 8 best value themes is given overleaf: 
Page 154

Page 155

37 
Page 155

Page 156

38 
Page 156

Page 157

39
Appendices 
Appendix 1 IJB Scorecard 
(Note comments re availability of NI Indicators for 2022 and MSG completeness)     
Outcome 1 - People are able to improve their health 2018/19
2019
Calendar
Year
2020
Calendar
Year
2021
Calendar
Year
2022
Calendar
Year
Target
2022
NI-1 - % of adults able to look after their health very well or quite well  93.0%  93.0% 93.2% 90.8% 90.8% 90.9%
NI-3 - % of adults supported at home who agree they had a say in how their
support was provided    76.0%   76.0% 72.5% 66.9% 66.9% 70.60%
NI-4 - % of adults supported at home who agree that their health & care
services seemed to be well co-ordinated   72.0%  72.0% 73.7% 66.0% 66.0% 66.40%
NI-16 - Falls rate per 1,000 population aged 65+   26.0  23.0  25.3 27.8 27.8 23
A&B - % of Total Telecare Service Users with Enhanced Telecare Packages  45.7% 45.6% 43.2% 41.2% 31.0%
NI-13 - Emergency Admissions bed day rate  108883 109,759  94,863 104,253 104,253 109,429
Outcome 2 - People are able to live in the community 2018/19
2019
Calendar
Year
2020
Calendar
Year
2021
Calendar
Year
2022
Calendar
Year
Target
2022
*MSG 1.1 - Number of emergency admissions - A&B  9,003 9,111 7,563 8,343 8,396 8,509
*MSG 2.1 - Number of unplanned bed days acute specialties - A&B  67,060 66,706 55,378 65,475 71,325 57,139
*MSG 2.2 - Number of unplanned bed days MH specialties - A&B  14,623 12,676 12,732 9,868 9,306 15,896
*MSG 3.1 - Number of A&E attendances - A&B  16,912 17,784 12,671 17,114 20,283 16,960
*MSG 6.1 - % of 65+ population  at Home (unsupported) - A&B    8.0%   7.9% 7.9% 7.5% 7.5%  8.1%
A&B - % of LAC who are looked after at home or in a community setting 82.4% 80.6% 83.6% 87.0%  90.0%
Outcome 3 - People have positive service-user experiences 2018/19
2019
Calendar
Year
2020
Calendar
Year
2021
Calendar
Year
2022
Calendar
Year
Target
2022
NI-2 - % of adults supported at home who agree they are supported to live as
independently    79.0%   79.0% 79.9% 75.0% 75.0% 78.8%
NI-5 - % of adults receiving any care or support who rate it as excellent or good   80.0%  85.0% 78.3% 68.6% 68.6% 75.3%
NI-6 - % of people with positive experience of their GP practice   85.0%  85.0% 84.5% 77.6% 77.6% 66.5%
*MSG 3.2 - % A&E attendances seen within 4 hours - A&B  93.4% 91.7% 93.1% 88.9% 83.3% 95.0%
CA72 - % LAAC >1yr with a plan for permanence 65.0%  85.2% 65.4% 67.1% 95.2%  81.0%
Outcome 4 - Services are centred on quality of life 2018/19
2019
Calendar
Year
2020
Calendar
Year
2021
Calendar
Year
2022
Calendar
Year
Target
2022
NI-7 - % of adults supported at home who agree their support had impact
improving/maintaining quality of life   74.0%  74.0% 76.50% 76.7% 76.7% 78.10%
NI-12 - Rate of emergency admissions per 100,000 population for adults  12,678 11,353 10,790 11960 11960 11,636
NI-14 - Readmission to hospital within 28 days per 1,000 admissions  87.0  76.0 91.0 91.0 91.0 110
*MSG 5.1 - % of last six months of life by setting community & hospital - A&B  90.0% 90.8% 92.40% 90.8% 90.8%  90.0 %
A&B - % of Waiting Time breaching >12 weeks 21.0% 38.0% 22.0% 37.0%  25.0%
IJB Perfomance Scorecard for Annual Performance Report
Page 157

Page 158

40 
Outcome 5 - Services reduce health inequalities 2018/19
2019
Calendar
Year
2020
Calendar
Year
2021
Calendar
Year
2022
Calendar
Year
Target
2022
NI-11 - Rate of premature mortality per 100,000 population  393 403 398 386 386 465
NI-17 - % of SW care services graded ‘good’ '4' or better in Care Inspectorate
inspections    86.0%   84.1% 87.1% 80.0% 80.0% 75.8%
NI-19 - No of days people [75+] spent in hospital when ready to be discharged,
per 1,000 population  640 540 346 584 584 761
CPC01.4.4 - % Waiting time from a patient’s referral to treatment from CAMHS 91.0% 92.5% 100.0% 80.0% 84.6% 90.0%
AC21 <=3 weeks wait between SM referral & 1st treatment 90.5% 91.3% 84.9% 80.0% 75.0% 90.0%
Outcome 6 - Unpaid carers are supported 2018/19
2019
Calendar
Year
2020
Calendar
Year
2021
Calendar
Year
2022
Calendar
Year
Target
2022
NI-8 - % of carers who feel supported to continue in their caring role   33.0%   33.0% 35.0% 38.0% 38.0% 29.7%
Outcome 7 - Service users are safe from harm 2018/19
2019
Calendar
Year
2020
Calendar
Year
2021
Calendar
Year
2022
Calendar
Year
Target
2022
NI-9 - % of adults supported at home who agree they felt safe    83.0%   83.0% 78.7% 76.4% 76.4% 79.7%
CP16 - % of Children on CPR with a completed CP plan 91.0% 89.0% 99.0% 99.0% 95.0% 100 %
CP43 - No of Child Protection Repeat Registrations - 18 months 0 0 0.0% 0.0%   0
CJ63 - % CPO cases seen without delay - 5 days 84.8% 95.6% 95.3% 85.3% 59.5%  80.0%
A&B - % of Adult Protection referrals completed within 5 days 45.8 % 39.50% 32.9% 20.0% 80.0%
A&B - % of Adult Protection referrals that lead to AP Investigation 12.5% 39.5% 11.0% 5.0% 10.0%
A&B - % of complaints [Stage 2] responded within timescale 25.0% 56.5% 73.0% 50.0% 20.0%
Outcome 8 - Health and social care workers are supported 2018/19
2019
Calendar
Year
2020
Calendar
Year
2021
Calendar
Year
2022
Calendar
Year
Target
2022
NI-10 - % of staff who say they would recommend their workplace as a good
place to work   71.0%  71.0% 70.0% 70.0% 70.0%  67.0%
SW only - HSCP Attendance 5.20  5.23 4.86 5.9 4.83 3.78 Days
Outcome 9 - Resources are used effectively in the provision of health and
social care services 2018/19
2019
Calendar
Year
2020
Calendar
Year
2021
Calendar
Year
2022
Calendar
Year
Target
2022
NI-15 - Proportion of last 6 months of life spent at home or in a community
setting  90.0%  91.0%   92.9% 91.3% 91.3% 90.1%
NI-18 - % of adults with intensive needs receiving care at home    67.0%  68.0% 72.3% 71.9% 71.9% 64.9%
NI-20 - % of health & care resource spend on hospital stays where patient
admitted in an emergency   22.0%  22.0% 19.2% 22.5% 22.5% 24.2%
*MSG 4.1 - Number of DD bed days occupied - A&B  9,530 8,237 5,338 7,006 11,083 8,604
Page 158

Page 159

41
Appendix 2 HWBOI’s/ Benchmarking 
(Note comments in relation to PHS advice on National Indicators unavailable until Jun 2023) 
Indicator Title Argyll & Bute HSCP A HSCP B HSCP C HSCP D HSCP E HSCP F HSCP G Scotland
NI - 1 Percentage of adults able to look after their health very well or
quite well 90.8% 92.4% 92.6% 92.4% 92.1% 92.7% 93.4% 91.7% 90.9%
NI - 2 Percentage of adults supported at home who agreed that they
are supported to live as independently as possible 75.0% 72.6% 72.1% 86.5% 73.4% 79.3% 73.1% 72.5% 78.8%
NI - 3 Percentage of adults supported at home who agreed that they
had a say in how their help, care, or support was provided 66.9% 76.8% 60.6% 72.1% 70.5% 70.2% 63.4% 64.3% 70.6%
NI - 4 Percentage of adults supported at home who agreed that their
health and social care services seemed to be well co-ordinated 66.0% 78.5% 54.1% 71.9% 64.5% 62.2% 59.3% 61.7% 66.4%
NI - 5 Total % of adults receiving any care or support who rated it as
excellent or good 68.6% 79.5% 70.3% 83.0% 78.6% 68.1% 73.9% 67.8% 75.3%
NI - 6 Percentage of people with positive experience of the care
provided by their GP practice 77.6% 69.8% 64.8% 77.2% 62.0% 60.0% 65.9% 67.3% 66.5%
NI - 7
Percentage of adults supported at home who agree that their
services and support had an impact on improving or maintaining
their quality of life
76.7% 81.7% 63.1% 84.3% 80.6% 73.3% 70.5% 79.2% 78.1%
NI - 8 Total combined % carers who feel supported to continue in their
caring role 38.0% 29.5% 30.8% 28.7% 27.4% 31.6% 29.4% 25.6% 29.7%
NI - 9 Percentage of adults supported at home who agreed they felt
safe 76.4% 84.9% 69.5% 86.0% 78.8% 72.1% 77.3% 75.3% 79.7%
NI - 11 Premature mortality rate per 100,000 persons 386 419 375 407 407 401 348 408 465
NI - 12 Emergency admission rate (per 100,000 population) 11,960 10,460 10,789 9,997 11,861 9,381 10,577 12,564 11,636
NI - 13 Emergency bed day rate (per 100,000 population) 104,253 92,375 112,745 106,529 105,914 83,298 121,675 95,726 109,429
NI - 14 Readmission to hospital within 28 days (per 1,000 population) 91 114 110 113 111 87 102 138 110
NI - 15 Proportion of last 6 months of life spent at home or in a
community setting 91.3% 92.5% 87.5% 91.5% 88.5% 92.3% 88.2% 90.1% 90.1%
NI - 16 Falls rate per 1,000 population aged 65+ 27.8 24.2 23.7 14.5 26.5 19.0 18.9 23.1 23.0
NI - 17 Proportion of care services graded 'good' (4) or better in Care
Inspectorate inspections 80.0% 75.7% 77.1% 80.3% 78.0% 80.0% 77.9% 87.0% 75.8%
NI - 18 Percentage of adults with intensive care needs receiving care at
home 71.9% 60.8% 63.4% 56.6% 63.8% 64.5% 57.5% 71.2% 64.9%
NI - 19 Number of days people spend in hospital when they are ready to
be discharged (per 1,000 population) 584 226 159 1,051 520 776 1,009 761 761
NI - 20 Percentage of health and care resource spent on hospital stays
where the patient was admitted in an emergency 22.5% 23.2% 23.0% 23.1% 23.3% 21.3% 20.4% 23.2% 24.2%
Core Suite of National Integration Indicators for Annual Performance Report
Page 159

Page 160

42 
Appendix 3 Winter & Systems Pressures Performance 
Page 160

Page 161

ARGYLL AND BUTE COUNCIL       BUTE AND COWAL AREA COMMITTEE                                                                 
CHIEF EXECUTIVE’S UNIT                6 JUNE 2023 
SUPPORTING COMMUNITIES FUND 2023/24 
1.0 EXECUTIVE SUMMARY  
1.1 The purpose of this report is to decide on the allocation of the Council’s Supporting
Communities Fund (SCF) for Bute and Cowal.
1.2 The total Supporting Communities Fund budget made available by the Council for
allocation in Bute and Cowal for distribution in 2023/24 is £38,228.09
1.3 It is recommended that 17 applicants are awarded funding.
1.4 Applicants awarded funds from the Council’s Supporting Communities Fund
have 18 months in which to spend the funds. 
Page 161 Agenda Item 12

Page 162

ARGYLL AND BUTE COUNCIL     BUTE AND COWAL AREA COMMITTEE 
CHIEF EXECUTIVE’S UNIT                6 JUNE 2023 
SUPPORTING COMMUNITIES FUND 2023/24 
2.0 INTRODUCTION 
2.1 The report details recommendations for the award of the Council’s Supporting
Communities Fund (SCF). The Supporting Communities Fund budget made
available by Council in Bute and Cowal for 2023/24 is £22,500.  
2.2 The total available for allocation is £38,228.09 due to additional funding from
the Shared Prosperity Fund, funds to support resiliency in communities
impacted by Covid-19 and from the return of unspent funds from previous
applicants.
2.3 Organisations applying to the fund were able to request up to £2,500.  The SCF
is popular and this year has attracted 29 applications from the Bute and Cowal
area, requesting a total of £60,854.50.
2.4 Applications have been scored by the Council’s Community Development Team
against criteria set out in the guidance (https://www.argyll-bute.gov.uk/council-
and-government/third-sector-grants) and a summary of all applications is
appended to this report. 17 are recommended to be funded. 
3.0 RECOMMENDATIONS 
3.1 Members are asked to agree that the 17 applications, marked as ‘Award’ within
Appendix 1 are awarded funding from the Supporting Communities Fund totalling
£38,228.09.  Detailed information about these projects is contained within
Appendix 2.  
Page 162

Page 163

4.0 DETAIL 
4.1 The SCF is assessed through a robust process which involves financial checks
and Community Development Team contact with the applicant to verify any
information where required.  All applicants need to provide satisfactory essential
information on governance and finance to be eligible.  Scoring is based on a set
of criteria outlined in the guidance and made available on the council’s website:
(Guidance for applicants).  Applications to the fund must be for projects that come
under one or more of these categories:
 Fairer Communities – tackling poverty by sharing opportunities.   
 Resilient Communities – community capacity building/rebuilding and
repairing from a pandemic
 Greener, Cleaner Communities – environmental action to support
addressing climate change 
 Creative Communities – creativity for health and wellbeing  
4.2 Of the 29 eligible applications received (requesting a total of £60,854.50), 21 are
either new applicants to the fund or have not applied within the last two years.  
4.3 Of the eligible applications to the SCF, 17 are recommended to be awarded
funding. 3 of these are for island based projects.  The applications recommended
for funding are labelled as ‘Award’ in the recommendation column in Appendix 1.
The detail of the projects is in Appendix 2.    
4.4 The projects recommended will deliver a range of activities from gardening and
cooking projects to woodland restoration and museum outreach.
4.5 Unsuccessful applications are marked as ‘No award’ in Appendix 1.  These
applicants will be offered support from the Community Development Team and
provided with information on alternative sources of funding. 
4.6 This year the total of £38,288.09 available for allocation is comprised of:
 £22,500 from the Council’s Supporting Communities Fund.
 £7,500 from the Shared Prosperity Fund.  This is specifically to support
projects related to Climate Change. These funds are ring fenced to the
highest scoring projects under the ‘Greener, Cleaner Communities’
criteria.
 £5,000 of funding specifically for projects that support resiliency in
communities impacted by Covid-19.  These funds are ring fenced to the
highest scoring projects under the ‘Resilient Communities’ criteria.
 Return of unspent funds totaling £3,228.09 from projects from the
financial periods 2020/21 and 2021/22 due to underspend or to projects
being unable to go ahead due to the pandemic restrictions.
Page 163

Page 164

4.7 Successful projects funded have to complete a report at the end to evidence the
impact of the spending of the money. The results of this are brought to Area
Committee in March 2025, if not before, depending on project duration. 
5.0 CONCLUSION 
5.1 The Supporting Communities Fund application and assessment process has
been completed as set out within its guidance (https://www.argyll-
bute.gov.uk/council-and-government/third-sector-grants ). 
5.2 The recommendations made fully allocate the funding available for financial year
2023/2024.
5.3 The 17 projects being put forward for an award will help communities to deliver
priority activities in their area in 2023/24.
5.4  All applicants to the fund are supported throughout the process and beyond by
the Community Development Team. 
6.0 IMPLICATIONS
6.1 Policy: n/a
6.2 Financial: Recommendations in the report are limited to the budget allocation
available in 2023/24 for the Supporting Communities Fund in Bute and Cowal .
6.3  Legal:  Applications are initially assessed to ensure that groups are constituted
with managed accounts.
6.4  HR: n/a 
6.5  Fairer Scotland Duty: The Supporting Communities Fund supports community
groups in tackling poverty, reducing inequality and building a fairer and more
inclusive Scotland. 
6.5.1   Equalities - protected characteristics: Applicants are given the options
of receiving the application in large print and other languages. 
6.5.2   Socio-economic Duty: None known 
6.5.3  Islands: 7 of the applicant projects are island based.   3 of these are
being recommended funding.
6.6 Climate Change: One of the four criteria within the process is specific to
mitigating climate change. 
6.7 Risk: risk to the public pound is managed through the assessment and scoring,
and through end of project monitoring process.
6.8  Customer Service: None
Page 164

Page 165

Pippa Milne
Chief Executive 
Alastair Redman
Policy Lead Councillor 
12 May 2023                                                 
For further information contact: 
Antonia Baird - Community Development Officer (MAKI)
Tel: 01546 604270
Email: antonia.baird@argyll-bute.gov.uk 
Kirsty Moyes – Community Development Team Leader
Tel. 01436 657635 
Email. kirsty.moyes@argyll-bute.gov.uk 
APPENDICES
Appendix 1 - Assessment Score and Recommendations
Appendix 2 - Project Summary Sheet
Page 165

Page 166

Appendix 1 - Assessment Score and Recommendations
Ref Applicant Recommendation Assessment
Score
Value of
Project
Amount
Requested
Recommended
Award 2023/24
Cumulative
Total 
1 ARC Addictions Recovery Cafe Award 7.7 £2,500.00 £2,500.00 £2,500.00 £2,500.00
2 POP Shop Enterprises CIC Award 7.6 £12,102.00 £2,450.00 £2,450.00 £4,950.00
3 *Waterbaby Arts SCIO Award 7.2 £2,500.00 £2,500.00 £2,500.00 £7,450.00
4 Comann nam Parant Comhghall  Award 7.1 £1,300.00 £1,300.00 £1,300.00 £8,750.00
5 Cowal Open Studios Award 7.1 £2,488.00 £2,488.00 £2,488.00 £11,238.00
6 **Friends of Glenan Wood  Award 7 £4,650.00 £2,500.00 £2,500.00 £13,738.00
7 Dunoon Burgh Hall Trust  Award 6.9 £10,000.00 £2,500.00 £2,500.00 £16,238.00
8 **Sandbank Community
Development Trust
Award 6.8 £2,965.00 £1,975.00 £1,975.00 £18,213.00
9 **Fyne Futures Ltd. Award 6.7 £22,500.00 £2,500.00 £2,500.00 £20,713.00
10 Scenic Sandbank  Award 6.7 £22,534.00 £2,500.00 £2,500.00 £23,213.00
11 Dunoon and Cowal Heritage
Trust
Award 6.6 £2,500.00 £2,500.00 £2,500.00 £25,713.00
12 Bullwood Nature Trail  Award 6.5 £5,500.00 £2,500.00 £2,500.00 £28,213.00
13 *Dunoon Foodbank  Award 6.5 £3,000.00 £2,500.00 £2,500.00 £30,713.00
14 Bute Community Land
Company 
Award 6.4 £3,700.00 £2,500.00 £2,500.00 £33,213.00
15 Bute Community Band Award (partial) 6.3 £2,250.00 £2,250.00 £2,157.04 £35,370.04
16 **Hunter's Quay Com Council  Award  6.3 £701.00 £701.00 £701.00 £36,071.04
17 Toward Seasports Club(SCIO) Award (partial) 6.3 £5,311.00 £2,490.50 £2,157.05 £38,228.09
18 South Cowal Community
Enterprises Ltd. 
No award 6.2 £2,500.00 £2,500.00 £0.00 £38,228.09
19 Voices of Argyll CIC  No award 6.2 £5,760.00 £2,500.00 £0.00 £38,228.09
20 Positive Pedals No award 6.2 £470.00 £470.00 £0.00 £38,228.09
Page 166

Page 167

21 Duthchas  No award 5.7 £2,690.00 £2,490.00 £0.00 £38,228.09
22 Loch Goil Community Council  No award 5.5 £500.00 £500.00 £0.00 £38,228.09
23 Isle of Bute BID  No award 5.4 £5,880.00 £1,880.00 £0.00 £38,228.09
24 Crossroads Caring For Carers
Cowal & Bute
No award 5.3 £2,773.00 £2,500.00 £0.00 £38,228.09
25 Bute Shinty Club  No award 4.9 £2,400.00 £2,400.00 £0.00 £38,228.09
26 Cowal Choral Club No award 4.8 £25,198.00 £2,500.00 £0.00 £38,228.09
27 Dunoon Senior Citizens Club No award 4.7 £2,335.00 £2,335.00 £0.00 £38,228.09
28 Carr Gomm  No award 3.7 £625.00 £625.00 £0.00 £38,228.09
29 Starter Pack Plus  No award 3.5 £1,500.00 £1,500.00 £0.00 £38,228.09  
TOTAL     £159,132.00 £60,854.50 £38,228.09 £38,228.09 
* Projects recommended to receive funds ring-fenced to support resiliency in communities impacted by Covid-19
** Projects recommended to receive funds ring-fenced to support Climate Change as part of the Shared Prosperity Fund 
Page 167

Page 168

Appendix 2 – Project Summary Sheet         
Applications Received (in order of scoring by Community Development Officer)
For submission to Bute and Cowal Area Committee for final decision (maximum
value £2,500). 
* Projects recommended to receive funds ring-fenced to support resiliency in
communities impacted by Covid-19
** Projects recommended to receive funds ring-fenced to support Climate Change as
part of the Shared Prosperity Fund
Ref:  1
Applicant: ARC Addictions Recovery Café SCIO
Recommended Award: £2,500 Assessment Score (out of 10): 7.7
Project Summary: 
Diversionary and creative activities for people in recovery including growing food
and cooking it, with the aim of tackling food poverty, gaining new skills and
friendships to build community and individual resilience.  Costs will include
refreshments for 30 people for 52 weeks, plants and seeds, protective clothing and
cooking lessons for 52 weeks. 
Recommendation: Award
Conditions: No conditions 
Ref:  2
Applicant:  POP Shop Enterprises CIC
Recommended Award: £2,450 Assessment Score (out of 10): 7.6
Project Summary:  
Accredited training sessions to stimulate successful social enterprise start-ups in
the area. The training will focus on nature based business, enterprise and female
entrepreneurship, supporting up to 24 people. The project was developed in
response to Dunoon Area Alliance’s research into the unmet needs of people
working around the challenges of childcare and on low and unstable incomes. 
Recommendation: Award 
Conditions: No conditions 
Ref:  3
Applicant: *Waterbaby Arts SCIO 
Recommended Award: £2,500 Assessment Score (out of 10): 7.2
Project Summary: 
16 accessible creative movement workshops with over 25 additional support
needs dancers supporting improved health and confidence.  Adult dancers (18-30)
will be supported to become dance teachers and little dancers (11-18) gain
confidence from interaction with older peers.  The project will end with a concert. 
This group were particularly vulnerable to the pandemic and were only permitted to
remove their masks in Christmas 2022 – this project aims to help overcome their
still current fear of physical contact and proximity.  
Page 168

Page 169

Recommendation: Award
Conditions:  No conditions 
Ref:  4
Applicant: Comann nam Parant Comhghall 
Recommended Award: £1,300 Assessment Score (out of 10): 7.1
Project Summary: 
A Gaelic immersion day to publicise the breadth and variety of work undertaken by
the local gaelic groups and stimulate new interest in the language and the area. 
The funding will include hall hire and workshop leaders, including drama, singing
and Bookbug. 
Recommendation: Award
Conditions: No conditions 
Ref:  5
Applicant: Cowal Open Studios
Recommended Award: £2,488 Assessment Score (out of 10): 7.1
Project Summary: 
Pilot set of art workshops for disadvantaged young people in Cowal, led by them,
to enable Cowal Open Studios to make new community partners and develop
community work.  They will reach out to 46 young people and the project will
culminate in an exhibition at Dunoon Burgh Hall.  Funding is requested towards
sessional fees to deliver the workshops and some art materials. 
Recommendation: Award
Conditions: No conditions 
Ref:  6
Applicant: **Friends of Glenan Wood
Recommended Award: £2,500 Assessment Score (out of 10): 7.0
Project Summary: 
Biodiversity and accessibility improvements to the woodlands to encourage greater
enjoyment in its use.  They will increase the amount of native species by building
bird and bat boxes, construct leaky dams and bog bridges to encourage more
wildlife, as well as supporting all members of the community to engage by
including transport costs and tools for their volunteers. 
Recommendation: Award
Conditions: No conditions 
Ref:  7
Applicant: Dunoon Burgh Hall Trust 
Recommended Award: £2,500 Assessment Score (out of 10): 6.9
Project Summary: 
Creative Blethers will engage with 45 persons from vulnerable groups, supported
by 10 volunteers, to enjoy and discover a variety of arts programming in a way that
is accessible to them, aiming to reduce isolation, learn new skills and improve
confidence and mental health.
Page 169

Page 170

Recommendation: Award
Conditions: No conditions 
Ref:  8
Applicant: **Sandbank Community Development Trust
Recommended Award: £1,975.00 Assessment Score (out of 10): 6.8
Project Summary: 
A contribution towards the costs of producing a new Community and Climate
Action Plan, which will be delivered by the community and includes printing and
distribution costs of both survey materials and the action plan itself when
completed. It will have a climate action element included.  
Recommendation: Award
Conditions: No conditions 
Ref:  9
Applicant: **Fyne Futures Ltd. 
Recommended Award: £2,500.00 Assessment Score (out of 10): 6.7
Project Summary: 
To continue to support work parties to maintain Bute’s 8 Incredible Edible sites; to
offer 4 food celebration events and to pilot a new foraging project with the object of
increasing certified learning opportunities, decreasing food poverty and social
isolation. Funds are requested to cover volunteer expenses, training for 10
volunteers and 4 Food Sharing Celebrations. These activities will contribute
towards their goal of educating and empowering people to achieve sustainable
rural living. 
Recommendation: Award
Conditions: No conditions 
Ref:  10
Applicant: Scenic Sandbank 
Recommended Award: £2,500.00 Assessment Score (out of 10): 6.7
Project Summary: 
Contribution towards startup costs, including compost, tools, seeds and bulbs, for
a new growing site that has recently been acquired for the community in a formerly
derelict site.  The new raised beds will provide edible and ornamental plants for the
citizens and the streetscape of Sandbank.
Recommendation: Award
Conditions: No conditions 
Ref:  11
Applicant: Dunoon and Cowal Heritage Trust
Recommended Award: £2,500 Assessment Score (out of 10): 6.6
Project Summary: 
“Memory Boxes” and “Heritage Blethers” will create new resources to outreach to
schools, care homes and community groups while also bringing people in to
Page 170

Page 171

explore their local museum.  A graduate trainee will research and develop creative
resources for these.
Recommendation: Award
Conditions: No conditions 
Ref:  12
Applicant:  Bullwood Nature Trail 
Recommended Award: £2,500 Assessment Score (out of 10): 6.5
Project Summary: 
Tidy up and repairs of much loved community woodland to welcome new users
from mental health and school groups, enabling them to participate in wellbeing
and environmental improvement activities. They are requesting funds for
interpretive signage, art materials, timber for repairs to their shed, horticultural
supplies, tools and bird feeders and food. 
Recommendation: Award
Conditions: No conditions 
Ref:  13
Applicant: *Dunoon Foodbank
Recommended Award: £2,500 Assessment Score (out of 10): 6.5
Project Summary: 
The foodbank wishes to expand its activities to support people to move from
dependence to independence with the provision of supportive activities and
advice, particularly a new foodbank garden.  Their gardening group has been
formed by foodbank attendees and they wish materials to build raised beds and
grow vegetables. 
Recommendation: Award
Conditions: No conditions 
Ref:  14
Applicant: Bute Community Land Company
Recommended Award: £2,500 Assessment Score (out of 10): 6.4
Project Summary: 
A programme of arts and wellbeing activities designed to increase engagement
with the community and with partners, with the object of improving the woodland
and awareness of biodiversity. The fund will contribute towards the purchase of
art, photography and yoga classes, a theatre event, a Scottish History event and
other seasonal activities. 
Recommendation: Award
Conditions: No conditions 
Ref:  15
Applicant: Bute Community Band
Recommended Award: £2,157.04 Assessment Score (out of 10): 6.3
Project Summary: 
Page 171

Page 172

Costs of preparation for and delivery of this inclusive and intergenerational band’s
Christmas concert, to ensure that there are no barriers to participation. Costs
include sheet music, percussion instruments, stands and banners and sound and
video engineering. 
Recommendation: Award (partial)
Conditions: No conditions 
Ref:  16
Applicant: **Hunter's Quay Community Council 
Recommended Award: £701.00 Assessment Score (out of 10): 6.3
Project Summary: 
2 new picnic tables to join the 12 benches along the sea front, which will also be
refurbished for the summer season. This will allow locals and visitors alike to
appreciate and enjoy the scenery.  Since the loss of the village shop this
community now has no social space and this will encourage people of all ages to
meet again, some of whom have still not come out since the pandemic.  
Recommendation: Award 
Conditions: No conditions 
Ref:  17
Applicant: Toward Seasports Club SCIO 
Recommended Award: £2,157.05 Assessment Score (out of 10): 6.3
Project Summary:
Training courses for 6 volunteers to become kayak leaders or coaches to increase
the capacity and sustainability of the Club of up to 50 members as well as a
contribution towards a high-volume hybrid kayak suitable for all abilities – to
increase their inclusivity.  
Recommendation: Award (partial)
Conditions: No conditions 
Ref:  18
Applicant: South Cowal Community Enterprises Ltd
Recommended Award: 0 Assessment Score (out of 10): 6.2
Project Summary:
Towards the cost of community led and delivered classes for up to 200 people in a
variety of topics as a means of bringing people together following the recent
difficult years, with the potential to support the development of new training 
businesses. 
Recommendation: No award
Conditions: 
Ref:  19
Applicant: Voices of Argyll CIC
Recommended Award: 0 Assessment Score (out of 10): 6.2
Project Summary:
Page 172

Page 173

Towards the cost of their winter concert, including rehearsals, and voice coaching. 
There are to be free tickets to refugees in the area, and recordings made available
to Dunoon Community Radio.  The choir offers health and wellbeing benefits to
singers.  
Recommendation: No award
Conditions: 
Ref:  20
Applicant: Positive Pedals
Recommended Award: 0 Assessment Score (out of 10): 6.2
Project Summary:
The purchase of a gazebo to allow the organisation to continue to refurbish and
repair unwanted bicycles to allow affordable access to bikes to people in greatest
need across the community. 
Recommendation: No award
Conditions: 
Ref:  21
Applicant: Dùthchas
Recommended Award: 0 Assessment Score (out of 10): 5.7
Project Summary:
Community consultation costs to gauge interest in a community growing project
with environmental benefits. Costs include the purchase of a projector, room hire,
fliers and some seeds and soil for demonstration. 
Recommendation: No award
Conditions: 
Ref:  22
Applicant: Loch Goil Community Council
Recommended Award: 0 Assessment Score (out of 10): 5.5
Project Summary:
Microphones to enhance the experience of attending online meetings, aiming to
make them more attractive to a bigger and more diverse audience and open up
new opportunities for the hall. 
Recommendation: No award
Conditions: 
Ref:  23
Applicant: Isle of Bute BID
Recommended Award: 0 Assessment Score (out of 10): 5.4
Project Summary:
Electricity supply and fees to artists in order to enhance Rothesay town centre by
the projection of locally produced artistic images, thereby increasing awareness of
the local arts trails and skills on the island.  
Recommendation: No award
Conditions: 
Page 173

Page 174

Ref:  24
Applicant: Crossroads Caring For Carers  Cowal & Bute
Recommended Award: 0 Assessment Score (out of 10): 5.3
Project Summary: 
Creative activities for carers and young carers in both Bute and Cowal in order to
provide a break from caring activities in a way that also improves health, wellbeing
and resilience in order to sustain the caring role.
Recommendation: No award
Conditions: 
Ref:  25
Applicant: Bute Shinty Club
Recommended Award: 0 Assessment Score (out of 10): 4.9
Project Summary:
Purchase of shinty equipment for children and travel costs to permit attendance at
off-island competition to ensure that the sport of shinty is accessible for all. 
Recommendation: No award
Conditions: 
Ref:  26
Applicant: Cowal Choral Club  
Recommended Award: 0 Assessment Score (out of 10): 4.8
Project Summary:
A contribution towards the annual overheads of Cowal Choral club, including
venue hire, musical Direction and performance licenses.  This will permit delivery
of their annual programme including visits to care homes, local flash mobs and
some subscription waivers where required. 
Recommendation: No award
Conditions: 
Ref:  27
Applicant: Dunoon Senior Citizens Club
Recommended Award: 0 Assessment Score (out of 10): 4.7
Project Summary:
A contribution towards essential repairs of this busy hall, in particular fees for
labour for repairs to glazing of hall doors, which will improve heating retention and
safety.
Recommendation: No award
Conditions: 
Ref:  28
Applicant: Carr Gomm
Recommended Award: 0 Assessment Score (out of 10): 3.7
Page 174

Page 175

Project Summary:
To fund ‘Keep Warm Boxes’ to help those who are vulnerable or impacted by
rising energy costs and power cuts to stay warm.  Funding is requested to provide
12 boxes. 
Recommendation: No award
Conditions: 
Ref:  29
Applicant: Starter Pack Plus
Recommended Award: 0 Assessment Score (out of 10): 3.5
Project Summary:
A contribution towards the costs of purchasing basic household goods and
bedding for vulnerable individuals or families who find themselves homeless; also
the costs of insurance for the organisation.
Recommendation: No award
Conditions: 
Page 175

Page 176

This page is intentionally left blank

Page 177

ARGYLL AND BUTE COUNCIL      BUTE AND COWAL AREA COMMITTEE
EDUCATION                                                6 JUNE 2023 
ROTHESAY JOINT CAMPUS ELC DELIVERY 
1.0 EXECUTIVE SUMMARY 
1.1 This report provides details of a planned change to the current Early Learning
& Childcare (ELC) delivery model within Rothesay Joint Campus which would
allow The Education Service to better meet our statutory 1140 delivery
requirements, support working parents of non-eligible 0-3 year olds secure
childcare and enable them to return to work whilst generating income. 
1.2 The closure of a partner provider, Rothesay Playgroup in 2020 led to a shortage
of childcare and funded ELC places on Bute. In order to meet our statutory
requirements, we increased the floor space and staffing to deliver funded ELC.
This has led to issues with how the accommodation is being used and a lack of
direct access to outdoor space as required by Care Inspectorate. Scottish
Government agreed to allow us to carry forward 1140 capital to address the
lack of childcare capacity on Bute.  There remains an issue with childcare for
non-eligible children on the island and more specifically care for children from
the age of 6 weeks to 3 years of age.   The Education team will use the capital
spend to adapt Rothesay Joint Campus to enable ELC to be delivered to those
entitled and also provide a purchasable childcare service to support working
parents of non-eligible children from 0-5. 
1.3 It is recommended that the Bute and Cowal Area Committee notes: 
a) The work of the early years’ team in identifying a solution to the
childcare issue on Bute; 
b) The plan to deliver non statutory childcare from within existing revenue. 
Page 177 Agenda Item 13

Page 178

ARGYLL AND BUTE COUNCIL       BUTE AND COWAL AREA COMMITTEE
EDUCATION                                                6 JUNE 2023 
ROTHESAY JOINT CAMPUS ELC DELIVERY 
2.0 INTRODUCTION 
2.1 This report provides details of a planned change to the current Early Learning
& Childcare (ELC) delivery model within Rothesay Joint Campus which would
allow The Education Service to better meet our statutory 1140 delivery
requirements, support working parents of non-eligible 0-3 year olds secure
childcare and enable them to return to work whilst generating income. 
2.2 The closure of a partner provider, Rothesay Playgroup in 2020 led to a shortage
of childcare and funded ELC places on Bute. In order to meet our statutory
requirements, we had to increase the floor space and staffing to deliver funded
ELC. This has led to issues with how the accommodation is being used and a
lack of direct access to outdoor space as required by Care Inspectorate.
Scottish Government agreed to allow us to carry forward 1140 capital to
address the lack of childcare capacity on Bute.  There remains an issue with
childcare for non-eligible children on the island and more specifically care for
children from the age of 6 weeks to 3 years of age.   The Education team will
use the capital spend to adapt Rothesay Joint Campus to enable ELC to be
delivered to those entitled and also provide a purchasable childcare service to
support working parents of non-eligible children from 0-5.   
3.0 RECOMMENDATIONS 
3.1 This report provides details of a change to the current ELC delivery model within
Rothesay Joint Campus which would allow us to better meet our statutory 1140
delivery requirements, support working parents of non-eligible 0-3 year olds
Page 178

Page 179

secure childcare and enable them to return to work (including ELC staff) whilst
generating income. 
3.2 It is recommended that the Bute and Cowal Area Committee notes: 
a) The work of the early years team in identifying a solution to the
childcare issue on Bute; 
b) The plan to deliver non statutory childcare from within existing revenue. 
4.0 DETAIL 
4.1 The closure of a partner provider, Rothesay Playgroup in 2020, has led to a
shortage of childcare and funded ELC places on Bute. In order to meet our
statutory requirements, we have had to increase the floor space and staffing to
deliver funded ELC. This has led to issues with how the accommodation is being
used and a lack of direct access to outdoor space as required by Care
Inspectorate. 
4.2 Scottish Government agreed to carry forward 1140 capital to address the lack
of childcare capacity on Bute. However, there still remains an issue with
childcare for non-eligible children on the island and more specifically care for
children from the age of 6 weeks to 3 years of age.  An eligible child is defined
in legislation (the Children and Young People (Scotland) Act 2014 and the
Provision of Early Learning and Childcare (Specified Children) (Scotland) Order
2014, as amended).  This is all 3 and 4 year olds and some children aged 2,
from the relevant start date. The date the child can access their funded
entitlement depends on their birth date.  Eligibility for funded early learning and
childcare entitlement for 2 year olds is those who are looked after children,
children in kinship care and those with a parent-appointed guardian as well as
those whose parents are on qualifying benefits.  EY commenced a small scale
pilot project to maximise use of the increased staffing by allowing parents to
purchase non-statutory ELC for their 2 year old children if space was available.
This has been successful in supporting a number of working parents. 
4.3 Following the 1140 capital investment at the Campus, the Education Service
plan to deliver childcare and 1140 funded entitlement on Bute for children aged
0-5 within Rothesay Joint Campus which would allow us to better meet our
statutory 1140 delivery requirements, support working parents of non-eligible 0-
3 year olds secure childcare and enable them to return to work (including ELC
staff) whilst generating income.  The delivery model will allow parents to choose
for their child to attend term time (38 weeks per year) or over 46 weeks per year
(better suiting working parents) and parents could also purchase additional
Page 179

Page 180

‘wrap-around hours’.  It is not possible to predict with certainty demand for this
service, however, through consultation with the only partner provider in the
island to ensure this service complements and does not compete with their
current delivery models, we do know that they have waiting lists for their 0-3
service on an ongoing basis. 
5.0 CONCLUSION 
5.1 Members should note that Rothesay Joint Campus will undergo adaptations to
allow the delivery of ELC funded entitlement and a purchasable childcare service
aimed at supporting working parents as a result of the closure of a partner provider
on the island. 
5.2 The adaptations are planned to be concluded, and the purchasable childcare
service implemented, from early 2024. 
6.0 IMPLICATIONS 
6.1 Policy – These adaptations will ensure we can deliver our statutory ELC
obligations as outlined within Blueprint for 2020: Expansion of ELC, Funding
Follows the Child and the National Standard, Scottish Government, 2018. They
will also ensure we can deliver any future legislative entitlements as outlined
within Best Start: Strategic ELC and SACC Deliver Plan, Scottish Government,
2022. 
6.2 Financial - Scottish Government capital funding will deliver the necessary
adaptations. The purchasable service may generate income however we are
unable to give projections until the service begins. The aim is to be cost neutral
year on year, dependent upon birth rates on the island. In the event of the
service incurring running costs, we will move back to a funded entitlement only
delivery model. 
6.3 Legal – None. 
6.4 HR – Contractual negotiations will begin with existing staff to ensure that
contracted hours can meet the wrap around requirements of the purchasable
childcare service. 
6.5  Fairer Scotland Duty: None. 
6.5.1   Equalities - protected characteristics: None. 
Page 180

Page 181

6.5.2   Socio-economic Duty: None. 
6.5.3 Islands - This service will ensure that working parents and families can live
and work on Bute as they will have access to vital childcare services. 
6.6 Climate Change – None.  
6.7 Risk – That the childcare service incurs a cost due to demand for 0-3 care
reducing.  In this event, we will move to a funded entitlement only delivery
model and redeploy excess staff. 
6.8  Customer Service – None. 
Douglas Hendry - Executive Director with responsibility for Education 
Councillor Yvonne McNeilly - Policy Lead for Education 
For further information contact: 
Tina Sartain, Education Manager
tina.sartain@argyll-bute.gov.uk 
24 April 2023 
Page 181

Page 182

This page is intentionally left blank

Page 183

ARGYLL AND BUTE COUNCIL  BUTE AND COWAL AREA
COMMITTEE 
CUSTOMER SERVICES  06 JUNE 2023 
CRUACH MOR AND CLACHAN FLATS WIND FARM TRUSTS 
1.0. INTRODUCTION 
1.1 This report seeks to update the Bute and Cowal Area Committee on the work
undertaken by the wind farm trusts set up at both Cruach Mhor (Glendaruel)
and Clachan Flats (Cairndow) in accordance with consented developments. 
1.2 The Area Committee is asked to note these updates, which are the most
recent of the annual updates required by the Area Committee on the work of
the Trusts. 
2.0 RECOMMENDATION 
2.1 Members are asked to note these updates, which are the most recent of the
annual updates required by the Area Committee on the work of the Trusts. 
3.0 DETAIL 
3.1 Wind Farm Trusts were set up in accordance with consented developments
at both Cruach Mhor (Glendaruel) and Clachan Flats (Cairndow). Part of the
conditions attached to those consents was that the Bute and Cowal Area
Committee be updated annually on the work undertaken by the Trusts in
supporting community projects within their Trust areas. 
3.2 The updates provided in this report, at Appendices 1 and 2, are the most
recent provided by the Trusts and cover the work for financial year 2022/23. 
4.0 CONCLUSION 
4.1 Members are asked to note the content of the submitted information. 
5.0 IMPLICATIONS 
5.1  Policy – none 
5.2  Financial – none 
5.3  Legal – none
Page 183 Agenda Item 14

Page 184

5.4  HR – none   
5.5  Fairer Scotland Duty: 
5.5.1  Equalities – protected – none 
5.5.2  Socio-economic Duty – none 
5.5.3  Islands – none 
5.6  Climate change – none 
5.7  Risk – none 
5.8  Customer Service – none 
Douglas Hendry
Executive Director with responsibility for Legal and Regulatory Support 
May 2023 
Appendix 1 – Clachan Flats Windfarm Trust Annual Report 2021/22 
Appendix 2 – Cruach Mhor Windfarm Trust Annual Report 2021/22 
For further information contact: Stuart McLean, Committee Manager, 01436
658717, stuart.mclean@argyll-bute.gov.uk                                                 
Page 184

Page 185

Community Benefit Annual Report 
www.scottishpowerrenewables.com              Reporting Template October 2020
Internal Use 
Please email a completed version of this report annually to communitybenefit@scottishpower.com 
Please provide sufficient information for us to understand what has been delivered and who has benefitted from the project/initiative. 
Beneficiary  Project and Description  Project Category
Total SPR
Funds Granted
(£)
Match funding
(Source &
amount)
Kilmorich Church Urgent repairs to the fabric of the church to maintain watertight
condition.
Community Facilities
& Services
£5,150 -
Cairndow Community Childcare Funding for community ceilidh. Community and
Local Events
£900 -
Argyll Arts Collection Funding for three events in Cairndow. Community and
Local Events
£760 - 
Project Categories: Community Facilities and Services Skills and Employment 
Community and Local Events Sport and Recreation 
Environmental Youth and Education 
Heritage Net Zero/Emission Reduction 
SPR windfarm providing fund:    Clachan Flats (Cairndow) Date report submitted: 10/05/23
Organisation administering fund:   Clachan Flats Winfdarm Trust Period Covered by Report 12/05/22 – 1/05/23
SPR Funds Received During Period £8,188.29
Reporting contact name and role:     Iain Lindsay – Secretary SPR Funds Spent During Period £14,346.00
Reporting contact email address iain@algiz.co.uk Percentage Spent of Annual Payment 175%     
Page 185

Page 186

Community Benefit Annual Report 
www.scottishpowerrenewables.com      Reporting Template October 2020 Internal Use
Please provide sufficient information for us to understand what has been delivered and who has benefitted from the project/initiative. 
Beneficiary  Project and Description  Project Category
Total SPR
Funds Granted
(£)
Match funding
(Source &
amount)
Cairndow Bloom & Wild Funding for improvements and maintenance to community garden. Community Facilities
and Services
£900 -
Cairndow Hall & Recreation Club Events and admin expenses. Community and
Local Events
£1,636 -
Cairndow Community Childcare Funding for insurance and accounting costs. Community Facilities
and Services
£4,500 -
Strachur Parent Partnership Group Funding for outdoor learning at Ardentinny. Youth and Education £500 £1,000 from
School’s Pupil
Equity Fund.  
Choose an item.    
Choose an item.    
Choose an item.   
Project Categories: Community Facilities and Services Skills and Employment 
Community and Local Events Sport and Recreation 
Environmental Youth and Education 
Heritage Net Zero/Emission Reduction 
Page 186

Page 187

Community Benefit Annual Report 
www.scottishpowerrenewables.com      Reporting Template October 2020 Internal Use 
Fund Administration Costs & Expenses 
None 
Planned projects (including those committed but not yet awarded)
Dunoon School Hostel Parent Partnership – They are seeking £1000 per year over a 3 year commitment. Trust has agreed to pay £500 for year one, and will review before
committing to year 2 and 3. 
Additional information 
Page 187

Page 188

This page is intentionally left blank

Page 189

CRUACH MHOR WINDFARM TRUST 
Report to Argyll and Bute Council, Bute and Cowal Area Committeee 2023       
With recovery from the Covid-19 pandemic, there has been an upturn in activity in
financial year 2022/23..    
As in previous years, the Trust provided support to Village Halls in Glendaruel and
Colintraive which facilitate a range of activities for communities, thanks to their
respective hard-working Committees. Much appreciated were the subsidised
Christmas meal at Colintraive and Burns lunch at Glendaruel. 
Support was also given to children in the area, mostly via Kilmodan Primary School
and its associated Parent Council. 
In February this year, in response to cost of living pressures, the Trust was able to
fund a payment of £200 to every permanent household in the area, administered by
Colintraive & Glendaruel Development Trust. 
The range of grants provided has resulted in a substantial decrease in the Trust’s
balance over the year.  However, with an expected receipt of over £40,000 from
Scottish Power Renewables, the Trust can continue to offer generous support to the
community of Colintraive and Glendaruel in the year ahead.  
Cruach Mhor Windfarm Trust 2022/23. 
Balance @ 1st April 2022                                                             £83,928.31 
Income                                                                                         £38,112.65 
Expenditure                                                                                  £63,258.51. 
Balance @ 31st March 2023                                                         £58,782.45   
David Eaglesham
Secretary/Treasurer.  
Page 189

Page 190

Income. 
Scottish Power                                                                              £37,762.65
Kilmodan Parent Council (underspend refunded)           £350.00                 
_______              
£38,112.65 
Expenditure.      
Date.             Detail.                                               Cheque No.             Amount. 
18/04/22 Argyll Fisheries Trust (River bank protection) 0400  £2500.00
17/05/22 Student grant     0401  £1000.00
17/05/22 Col-glen Boat Club  (Boat house)   0402             £1000.00                    
17/05/22       Dunoon & District Angling Club (Bridges etc) 0403               £492.00        
17/05/22 Glendaruel Village Hall (ARC)                         0404  £2940.00 
17/05/22        Colintraive & Glendaruel Development Trust    0405          £10619.04    
(Admin support)
13/06/22 Colintraive Village Hall   (Photobook)                 0406   £830.15 
12/07/22 Secretary/Treasurer expenses (2year)  0407   £400.00
21/07/22 1st Glendaruel Guides  (Running costs)  0408  £1500.00
21/07/22 Col-glen Shinty Club  (Playing equipment) 0409  £1420.75
08/09/22 Colintraive & Glendaruel Development Trust 0411   £544.99    
(Prescription runs)
27/09/22 K Black  (Children’s Halloween Party)  0412   £500.00
21/10/22 Dunoon Grammar School (Tanzania trip) 0413  £1400.00
21/10/22 Colintraive Village Hall (Christmas meal)  0414  £2000.00
11/11/22 Kilmodan School (Interactive screen)  0415  £2091.58
22/01/23 Colintraive & Glendaruel Development Trust 0416          £27600.00    
(Cost of living support)
22/01/23 Dunoon School Hostel Parent Partnership 0417  £1500.00    
(Teaching support)
22/01/23 Kilmodan Parent Council  (Benches)          0418  £1020.00
03/02/23        Glendaruel Village Hall    (Burns lunch)  0419    £700.00 
25/02/23  Glendaruel & Colintraive Gun Club (clay trap) 0420  £2000.00
04/03/23 Glendaruel Village Hall (Tai Chi)   0421  £1200.00
-------------                                                                                                                  
£63,258.51 
Cheques not yet presented
24/03/23 Dunoon & District Angling Club (Tree removal) 0422    £900.00
24/03/23 Colintraive Village Hall (Heritage Centre) 0423  £2000.00
Page 190

Page 191

Bute and Cowal Area Committee 
Workplan 2022-2023 
Committee Date Report Description Lead Service and
contact officer
Regularity of
occurrence/considera
tion
Date for
Reports to
Committee
Services
Additional
Comment
June 2023 
6 June 2023 Supporting
Communities Fund
Applications 
Chief Executives Unit – 
Antonia Baird
Annual report 12 May
2023
Usually at March
Meeting but will be
coming to June
Meeting for 2023
only.
6 June 2023 Quarterly Performance
Scorecard FQ4 2022/23
Customer Support 
Services –
Sonya Thomas
Quarterly Report 12 May
2023 
6 June 2023  Roads and
Infrastructure Services
Update
Roads and
Infrastructure Services – 
Mark Calder
Quarterly Report 12 May
2023 
6 June 2023 Primary School Report Education – Louise
Lawson, Brenda Reid,
Kirsteen MacDonald
Annual Report 12 May
2023 
6 June 2023 Secondary School
Report - Dunoon
Grammar School
Education –
David Mitchell (Head
Teacher)
Annual Report 12 May
2023 
6 June 2023 Secondary School
Report – Rothesay Joint
Campus 
Education – 
Louise Nicol (Head
Teacher)
Annual Report 12 May
2023 
6 June 2023 HSCP Annual Update
Report
Health and Social Care
Partnership –
Annual Update  12 May
2023 
Page 191
Agenda Item
15

Page 192

Bute and Cowal Area Committee 
Workplan 2022-2023
Committee Date Report Description Lead Service and
contact officer
Regularity of
occurrence/considera
tion
Date for
Reports to
Committee
Services
Additional
Comment
Charlotte Craig
6 June 2023 Dunoon BID Ballot Development and
Economic Growth – 
Marilyn Rieley 
As Required 12 May
2023 
6 June 2023 Expansion of Early
Years Provision on Bute 
Education – 
Wendy Brownlie
As Required 12 May
2023 
6 June 2023 Rothesay Townscape
Heritage –
Recommendation of
award
Development and
Economic Growth –
Colin Fulcher
As Required 12 May
2023 
6 June 2023 Cemetery Maintenance
and Roads Access Fund
Roads and
Infrastructure Services – 
Mark Calder
As Required 12 May
2023 
6 June 2023 Lamont Bequest
Applications
Legal & Regulatory 
Support – 
Stuart McLean
As Required 12 May
2023 
6 June 2023 Cruach Mor And
Clachan Flats Windfarm
Trust
Legal & Regulatory 
Support – 
Stuart McLean
Annual Report 12 May
2023 
September 2023 
5 September
2022
Area Performance
Report – FQ1 2023/24
Customer Support 
Services – 
Sonya Thomas
Quarterly Report 11 August
2023 
5 September
2022
Roads and
Infrastructure Service
Update
Roads and 
Infrastructure –
Mark Calder
Quarterly Report 11 August
2023 
Page 192

Page 193

Bute and Cowal Area Committee 
Workplan 2022-2023
Committee Date Report Description Lead Service and
contact officer
Regularity of
occurrence/considera
tion
Date for
Reports to
Committee
Services
Additional
Comment 
5 September
2022
Annual Recycling
Performance Report
Roads and 
Infrastructure –
Mark Calder
Annual Report  11 August
2023 
5 September
2022
Supporting
Communities Fund –
End of Project
Monitoring Report 
Chief Executive Unit –
Kirsty Moyes/Rona Gold 
Annual Report 11 August
2023 
December 2023
5 December
2023
Quarterly Performance
Scorecard FQ2 2023/24
Customer Support 
Services – 
Sonya Thomas
Quarterly Report 10
November
2023 
5 December
2023
Charitable Trusts,
Bequests and Trust
Funds
Legal & Regulatory 
Support – 
Stuart McLean
Annual Report 10
November
2023 
5 December
2023
ACHA Annual Update ACHA – 
Chief Executive 
Annual
Report/Presentation
1
November
2022 
5 December
2023
HSCP Annual
Performance Report 
Health & Social Care 
Partnership – 
Charlotte Craig
Annual Report 10
November
2023 
5 December
2023
The Third Marquis of
Bute’s Silver Wedding
Dowry Fund
Legal & Regulatory 
Support – 
Stuart McLean
Annual Report 10
November
2023 
5 December
2023
The Provost’s fund
(Bute) – Award
Recommendations 
Legal & Regulatory 
Support – 
Stuart McLean
As required 10
November
2023 
Page 193

Page 194

Bute and Cowal Area Committee 
Workplan 2022-2023
Committee Date Report Description Lead Service and
contact officer
Regularity of
occurrence/considera
tion
Date for
Reports to
Committee
Services
Additional
Comment
5 December
2023
Roads and
Infrastructure Service
Update
Roads and 
Infrastructure – 
Mark Calder
Quarterly Report 10
November
2023 
5 December
2023
Local Housing Strategy
Annual Update
Development and
Economic Growth – 
Douglas Whyte
Annual Update 10
November
2023 
Page 194

Page 195

ARGYLL AND BUTE COUNCIL  BUTE AND COWAL AREA
COMMITTEE 
LEGAL & REGULATORY SUPPORT 6 June 2023 XX MARCH 2021 
LAMONT BEQUEST AWARD RECOMMENDATIONS 
1.0 EXECUTIVE SUMMARY 
1.1 This report gives Members information regarding an application that has been
received for support from the Lamont Bequest. 
2.0 RECOMMENDATIONS 
2.1 The Bute and Cowal Area Committee is asked to agree to award £50 to the
individual applicant that meets the criteria of the Lamont Bequest. 
3.0 DETAIL 
3.1 The Bute and Cowal Area Committee on 01 December 2020 agreed new
distribution arrangements for the Lamont Bequest, which had been established
to support the poor of Kilfinan. In order to be considered for an award applicants
must; 
3.1.1 be in receipt of a qualifying benefit (Jobseekers Allowance, Employment
Support Allowance, Income Support, or Universal Credit) and for those
people who are employed/self-employed, they must be in receipt of some
amount of Universal Credit as well (a nil payment due to deductions for
earned income would mean they do not qualify); 
3.1.2 live within the Parish of Kilfinan, which includes everyone with a PA21
postcode; and 
3.1.3 be over the age of 16. 
3.2 Furthermore, it was agreed that successful individual applicants would receive
£50 while those applying on behalf of their family would receive £100. 
3.3 An application has been received, on behalf of an individual, which is
recommended for award. Details of the application can be found at appendix 1. 
3.4 The total funds available for distribution from the Lamont Bequest are
approximately £4.5k. Should members be minded a total of £50 will be awarded
during this award cycle. 
4.0 CONCLUSION 
4.1 Members are asked to consider the application that has been received for
Page 195 Agenda Item 16a

Page 196

support from the Lamont Bequest and to approve the financial award
recommended within this report.   
5.0 IMPLICATIONS 
5.1 Policy None 
5.2 Financial None, the Council acts as trustee for the Fund, it
does not represent assets of the Council. However,
there is a risk that the Council would have to repay
the Trust if an objection was raised as to the use of
the funds.
5.3 Legal Area Committees, as Trustees, must ensure that the
distribution arrangements comply with the terms of the
funds, failure to do so would result in the Council being
liable. 
5.4 HR None
5.5 Fairer Scotland Duty None
5.5.1 Equalities –
protected characteristics
None
5.5.2 Socio-economic
Duty
None
5.5.3 Islands None
5.6 Climate change None
5.7 Risk None
5.8 Customer Service None 
Douglas Hendry
Executive Director with responsibility for Legal and Regulatory Support 
May 2023                                                  
For further information contact: 
Stuart McLean, Committee Manager
Tel. No: 01436 658717
Email: Stuart.Mclean@argyll-bute.gov.uk 
APPENDICES 
Appendix 1 – Application 1 
Page 196

Page 197

Document is Restricted
Page 197 Agenda Item 16bNOT FOR PUBLICATION by virtue of paragraph(s) 6
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 198

This page is intentionally left blank

Page 199

Document is Restricted
Page 199 Agenda Item 17NOT FOR PUBLICATION by virtue of paragraph(s) 8
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 200

This page is intentionally left blank