Democracy Spraffa

Public reports pack

Argyll and Bute Council · 5 March 2024
Back to Bute and Cowal Area Committee — 5 March 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD
27 February 2024 
NOTICE OF MEETING 
A meeting of the BUTE AND COWAL AREA COMMITTEE will be held ON A HYBRID BASIS IN
THE QUEEN'S HALL, DUNOON AND BY MICROSOFT TEAMS on TUESDAY, 5 MARCH 2024
at 10:00 AM, which you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. MINUTES 
(a) Bute and Cowal Area Committee - 5 December 2023 (Pages 3 - 8)  
(b) Bute and Cowal Area Community Planning Group - 6 February 2024 (Pages 9 - 18)  
(c) Cowal Transport Forum - 12 December 2023 (Pages 19 - 24) 
4. PUBLIC QUESTION TIME 
5. AREA PERFORMANCE REPORT - FQ3 2023/24 (Pages 25 - 70)  
Report by Executive Director with responsibility for Customer Support Services 
6. PRIMARY AREA ATTAINMENT REPORT: BUTE AND COWAL (Pages 71 - 86)  
Report by Executive Director with responsibility for Education 
7. ROADS AND INFRASTRUCTURE SERVICES UPDATE (Pages 87 - 90)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
8. ROADS CAPITAL RECONSTRUCTION PROGRAMME 2024/25 (Pages 91 - 96)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
9. HOUSING SERVICES ACTIVITY UPDATE - STRATEGIC HOUSING INVESTMENT
PLAN (SHIP) - ANNUAL UPDATE (Pages 97 - 110)  
Report by Executive Director with the responsibility for Development and Economic
Public Document Pack

Page 2

Growth 
10. 2023/24 ACTIVE TRAVEL PROGRESS REPORT (Pages 111 - 126)  
Report by Executive Director with responsibility for Development and Economic Growth 
11. ROTHESAY TOWNSCAPE HERITAGE SCHEME - MARCH 2024 FINAL UPDATE
(Pages 127 - 134)  
Report by Executive Director with responsibility for Development and Economic Growth 
12. SUPPORTING COMMUNITIES FUND - MONITORING OF PROJECTS FUNDED
(Pages 135 - 142)  
Report by Chief Executive 
13. AREA PLANS UPDATE (Pages 143 - 156)  
Presentation by Corporate Support Manager, Argyll and Bute Council 
REPORTS FOR NOTING 
14. PORT RIDDELL SLIP – UPDATE AND FUTURE OPTIONS (Pages 157 - 188)  
Report by Executive Director with responsibility for Development and Economic Growth 
15. DRAFT BUTE AND COWAL AREA COMMITTEE WORKPLAN (Pages 189 - 192) 
Bute and Cowal Area Committee 
Councillor Gordon Blair Councillor Audrey Forrest
Councillor Daniel Hampsey Councillor Reeni Kennedy-Boyle
Councillor Liz McCabe (Chair) Councillor Yvonne McNeilly (Vice-Chair)
Councillor Ross Moreland Councillor William Sinclair
Councillor Peter Wallace   
Contact: Julieann Small, Senior Committee Assistant - 01546 604043

Page 3

MINUTES OF THE MEETING OF THE BUTE AND COWAL AREA COMMITTEE HELD ON A
HYBRID BASIS IN THE QUEEN'S HALL, DUNOON AND BY MICROSOFT TEAMS 
ON TUESDAY, 5 DECEMBER 2023 
Present: Councillor Yvonne McNeilly (Chair) 
Councillor Gordon Blair
Councillor Audrey Forrest
Councillor Reeni Kennedy-Boyle 
Councillor Ross Moreland
Councillor William Sinclair
Councillor Peter Wallace 
Attending: Stuart McLean, Committee Manager 
David Allan, Estates and Property Development Manager
Stuart Watson, Assistant Network and Standards Manager
Caroline Cherry, Head of Adult Services, HSCP
Michelle Mundie, Chief Executive, ACHA
Seymour Adams, Vice-Chair, CHARTS 
1. APOLOGIES FOR ABSENCE 
The Vice-Chair welcomed everyone to the meeting. 
Apologies for absence were received from Councillor Liz Mccabe. 
The Vice-Chair ruled, and the Committee agreed, to consider a report on the Third
Marquis of Bute’s Silver Wedding Dowry Fund as a matter of urgency by reason that the
dowry can only be awarded to girls resident in Rothesay being married in December and
to consider this after item 13 of the Agenda. 
2. DECLARATIONS OF INTEREST 
Councillor Peter Wallace declared a non-financial interest in relation to item 10 of the
agenda (Former Rothesay Academy, Isle of Bute – Pre-application for proposed
demolition and redevelopment), advising that he is the Council representative on the Fyne
Homes Board. He advised that he would remain in the meeting during the consideration of
this item of Business. 
Councillor Ross Moreland declared a non-financial interest in relation to item 6 of the
agenda (CHARTS (Argyll and the Isles)), advising that he is a Council representative on
the CHARTS Board. He advised that he would remain in the meeting during the
consideration of this item of Business. 
3. MINUTES 
(a) Bute and Cowal Area Committee - 5 September 2023 
The Minute of the meeting of the Bute and Cowal Area Committee, held on 5
September 2023 was approved as a correct record. 
(b) Bute and Cowal Area Community Planning Group - 31 October 2023 
Page 3 Agenda Item 3a

Page 4

The Minute of the meeting of the Bute and Cowal Area Community Planning Group,
held on 31 October 2023 was noted. 
(c) Cowal Transport Forum - 13 September 2023 
The Minute of the meeting of the Cowal Transport Forum, held on 13 September
2023 was noted. 
4. PUBLIC QUESTION TIME 
The Committee Manager advised that there had been no public questions submitted in
advance of the meeting. Having noted that there were members of the public in
attendance, the Vice Chair invited them to submit any questions they may have.     
Juliette Gill (Present) 
On behalf of Hunters Quay Community Council, how will the Levelling Up Fund be
distributed and how will it benefit Hunters Quay? 
Councillor McNeilly advised that more information on the funding would be rolled out in
due course, and that the Council were exploring, big, strategic projects that would benefit
the whole of Argyll and Bute. Councillor McNeilly added that a number of agencies would
be involved in delivering this project and that all were committed to taking a creative
approach to ensure all possible benefits are realised. 
The Committee highlighted that they were excited for what the funding could do for the
area. 
5. ACHA ANNUAL UPDATE 
Consideration was given to a presentation by the Chief Executive of ACHA, which
provided an update on a number of areas including the investment programme for
2023/24; the Scottish Government Grant which has allowed the progression of a number
of adaptations and essential aids for the most vulnerable customers across Argyll and
Bute; the Exemplar Estates initiative; the Business, Energy, Industrial Strategy (BEIS); the
Whole House Retrofit Programme; the Net Zero and Warm Homes Funds and the
installation of air source heating pumps. Information on Welfare rights was also provided. 
Decision 
The Bute and Cowal Area Committee considered and noted the information provided in
the presentation. 
(Reference: Presentation by Chief Executive, Argyll Community Housing Association Ltd,
submitted) 
6. CHARTS (ARGYLL AND THE ISLES) 
The Committee gave consideration to a presentation by the Vice-Chair of the Cultural
Heritage and Arts Assembly (CHARTS) for Argyll and the Isles. The presentation included
information on the impact of partnership working on both regional and local areas and
provided highlights of key projects throughout the Bute and Cowal Area. Mr Adams also
Page 4

Page 5

provided information in relation to funding streams and the benefits of the continued
support received from Argyll and Bute Council. 
Decision 
The Bute and Cowal Area Committee considered and noted the information provided in
the presentation. 
(Reference: Presentation by Vice-Chair, Cultural Heritage and Arts Assembly, submitted) 
7. AREA PERFORMANCE REPORT - FQ2 2023/24 
Consideration was given to the Area Performance Report for financial quarter 2 of
2023/24 (July to September 2023) which illustrated the agreed performance measures for
this period. 
Decision 
The Bute and Cowal Area Committee: 
1. noted and considered the performance and supporting commentary as presented; 
2. noted that upon receipt of the Quarterly Performance Report the Area Committee
should contact either the Responsible Named Officer or Sonya Thomas with any
queries; and 
3. noted that work was ongoing and to respond to Sonya Thomas with requests or
comments regarding the layout and format of the Performance Report and Scorecard. 
(Reference: Report by Executive Director with responsibility for Customer Support
Services, dated 1 November 2023, submitted) 
8. HEALTH AND SOCIAL CARE PARTNERSHIP PERFORMANCE REPORT - FQ1
2023/24 
The Committee gave consideration to a report which provided an update on performance
against each of the service areas and the 93 supporting Key Performance Indictors, as
well as an update from the Heads of Service giving a wider context and identifying risks
and mitigations. The report also provided an update on the National Health and Wellbeing
Outcomes and Ministerial Steering Group Integration Indicators and information in relation
to delayed discharges. 
Decision 
The Bute and Cowal Area Committee considered and noted: 
1. the performance for FQ1 (April - June 2023/24); 
2. the summary overview of the Heads of Service Performance update; 
3. the performance update on the National Health & Wellbeing Outcomes and Ministerial
Steering Group Integration Indicators, as at Appendix 1 of the report; 
Page 5

Page 6

4. the System Pressure Report for August 2023, as at Appendix 2 of the report; and 
5. the Delayed Discharge Sitrep for August 2023, as at Appendix 3 of the report. 
(Reference: Report by Senior Performance and Improvement Manager, submitted) 
9. ROADS AND INFRASTRUCTURE SERVICES UPDATE 
The Committee gave consideration to a report which provided links to the recent activities
of Roads and Infrastructure Services. 
Decision 
The Bute and Cowal Area Committee considered and noted the contents of the report. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services, dated November 2023, submitted) 
10. FORMER ROTHESAY ACADEMY, ISLE OF BUTE - PRE- APPLICATION FOR
PROPOSED DEMOLITION AND REDEVELOPMENT 
Consideration was given to a report asking members to endorse the submission of a pre-
application to consider the potential demolition and redevelopment of the Former
Rothesay Academy site that was closed in 2007 following the development of the new
school. 
Decision 
The Bute and Cowal Area Committee: 
1. noted the lack of a viable redevelopment option for the former Rothesay Academy
despite the property being marketed and available for over a decade; 
2. noted the interest from Fyne Homes to create a masterplan for the redevelopment of
the site along with their adjacent site to create new homes for the area; and 
3. endorsed officers to submit a pre-application to consider the potential demolition and
redevelopment of the site and confirm this approach reflects the views of the area
committee and the wider community for the future of this site. 
(Reference: Report by Executive Director with responsibility for Commercial Services
dated 30 October 2023, submitted) 
11. ROTHESAY TOWNSCAPE HERITAGE SCHEME - DECEMBER 2023 UPDATE 
Due to unforeseen circumstances there was no officer available to present this report. 
Decision 
The Bute and Committee Area Committee agreed to continue consideration of this report
to the next meeting. 
Page 6

Page 7

(Reference: Report by Executive Director with responsibility for Development and
Economic Growth, dated 18 October 2023, submitted) 
12. CHARITABLE TRUSTS, BEQUESTS AND TRUST FUNDS 
The Committee gave consideration to a report which provided details on proposals
relating to the ongoing management and proposed distribution arrangements for
Charitable Trusts, Bequests and Trust Funds for which the Bute and Cowal Area
Committee are Trustees. 
Decision 
The Bute and Cowal Area Committee: 
1. noted and considered the financial position of all the Charitable Trusts, Bequests and
Trust Funds as of August 2023; and 
2. agreed that funds that held less than £250 for distribution have a moratorium placed on
them to lessen the administrative burden and allow interest to accumulate to ensure
maximum community benefit at a later date. 
(Reference: Report by Executive Director with responsibility for Legal and Regulatory
Support, dated November 2023, submitted) 
13. DRAFT BUTE AND COWAL AREA COMMITTEE WORKPLAN 
The Bute and Cowal Area Committee workplan was before members for information. 
Decision 
The Bute and Cowal Committee noted the contents of the workplan. 
(Reference: Bute and Cowal Area Committee workplan, dated 5 December 2023) 
14. THE THIRD MARQUIS OF BUTE'S SILVER WEDDING DOWRY FUND 
Members gave consideration to a report which gave information regarding an application
that had been received requesting support from the Third Marquis of Bute’s Silver
Wedding Dowry Fund. 
Decision 
The Bute and Cowal Area Committee agreed to grant £500 to the applicant. 
(Reference: Report by Executive Director with responsibility for Legal and Regulatory
Support, dated December 2023, submitted) 
Page 7

Page 8

This page is intentionally left blank

Page 9

MINUTES OF THE MEETING OF THE BUTE AND COWAL COMMUNITY PLANNING GROUP HELD
BY MICROSOFT TEAMS 
ON TUESDAY, 6 FEBRUARY 2024 
Present: Reeni Kennedy-Boyle, Fyne Futures (Vice-Chair)
Stuart McLean, Committee Manager, Argyll and Bute Council 
Ailie Law, Community Development Officer, Argyll and Bute Council
Aimie Dow, Community Development Officer, Argyll and Bute Council
Stuart Green, Corporate Support Manager, Argyll and Bute Council
Mary Holt, Community Justice Co-Ordinator, Argyll and Bute Council
Councillor Gordon Blair
Jennifer Dryden, Argyll and Bute Health and Social Care Partnership
Inspector Bart Simonis, Police Scotland
Sergeant Eddie McGunnigal, Police Scotland
Christopher Spence, Scottish Fire and Rescue Service
Janis Marshall Reilly, Argyll and Bute TSI
Alex Wilde, Shaping Places for Wellbeing, Improvement Service
Becky Hothersall, Shaping Places for Wellbeing, Improvement Service
Ann Campbell, Dunoon Community Development Trust
John Glen, Bute BID
Lauren Worrell, NFU Scotland
Jean Moffat, Bute Community Council
Robert Trybis, Dunoon Gourock Ferry Action Group 
Attending: David Gould, Includem
Rhyddian Knight, Friends of Glenan Wood
Councillor Audrey Forrest
Councillor William Sinclair
Andrew Galloway, Local Democracy Reporter, Argyll and Bute 
1. WELCOME AND APOLOGIES 
The Vice-Chair welcomed everyone to the meeting and general introductions were made. 
Apologies for absence were intimated on behalf of: 
Dunoon Community Council;
Dee James, Argyll and Bute Rape Crisis;
Councillor Daniel Hampsey;
Councillor Liz McCabe;
Naomi Swann, Argyll and Bute Health and Social Care Partnership;
Melony MacLean, ACHA;
Jen Broadhurst, Argyll and Bute Citizens Advice Bureau;
Susan MacRae, Skills Development Scotland;
Rhona Grant, Community Learning Services, Live Argyll;
John Brint, Ardentinny Community Council;
John Park, Sandbank Community Development Trust; and
Page 9 Agenda Item 3b

Page 10

Stephen Kelly, Scottish Fire and Rescue Service. 
Having noted the commitments of those in attendance, the Vice-Chair agreed to vary the
order of business. This Minute reflects the order in which discussions took place. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest intimated. 
3. MINUTES 
(a) Meeting of the Bute and Cowal Community Planning Group held on 31
October 2023 
The Minutes of the Bute and Cowal Area Community Planning Group meeting held
on Tuesday 31 October 2023 were approved as a correct record. 
4. GOVERNANCE 
(a) Area Community Planning Group Governance Arrangements 
The group gave consideration to a report which outlined the governance
arrangements of the Bute and Cowal Area Community Planning Group (Area CPG)
specifically the Terms of Reference, membership and future meeting dates. 
Decision 
The Bute and Cowal Area Community Planning Group: 
1. considered and adopted the Terms of Reference submitted at Appendix 1 of the
report and to agreed that they would be reviewed on an annual basis to ensure
their ongoing currency and appropriateness for the work of the Area CPG as it
develops over time; 
2. considered and agreed the membership of the group at Appendix 2 of the report,
subject to the inclusion of Fyne Futures, Friends of Glenan Woods and Castle
House Museum, and agreed that the membership of the group would be
reviewed on an annual basis to ensure currency and appropriateness for the
work of the group as it develops over time; and
3. noted the future meeting dates submitted within the report. 
(Reference: Report by, Committee Manager, Argyll and Bute Council, dated 6
February 2024, submitted) 
(b) Appointment of Chair of the Bute and Cowal Area Community Planning Group 
The group gave consideration to a report providing information relating to the
appointment of Chair of the Bute and Cowal Area Community Planning Group and
outlined the expected time commitment and information on the role. 
Reeni Kennedy-Boyle nominated Bute Community Council representative Jean
Moffat who confirmed that she would be happy to accept this position. With there
being no other nominations, this became the decision of the group.     
Page 10

Page 11

Decision 
The Bute and Cowal Area Community Planning Group agreed that Jean Moffat,
Bute Community Council, be appointed as Chair. 
(Reference: Report by Committee Manager, Argyll and Bute Council, dated 6
February 2024, submitted) 
5. COMMUNITY PLANNING PARTNERSHIP MANAGEMENT COMMITTEE
UPDATE 
The group gave consideration to a report which outlined matters discussed during a
meeting of the Community Planning Partnership (CPP) Management Committee held on
12 January 2024. The report provided a summary of a presentation in relation to the
Council’s Area Plans, as well as information on matters arising from previous Area
Community Planning Group meetings across Argyll and Bute. The report also included
updates on a number of cross cutting themes such as Climate Change; Financial
Inclusion; Digital Communities; the Argyll and Bute Outcomes Improvement Plan (ABOIP)
for 2024-34; and Community Wealth Building. 
Discussion was had around the need for further discussion around the opportunities
afforded by Community Wealth Building at a future meeting of the Area Community
Planning Group.
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the contents
of the report.
(Reference: Report by Committee Manager, Argyll and Bute Council, dated 6 February
2024, submitted) 
6. ARGYLL AND BUTE HEALTH AND SOCIAL CARE PARTNERSHIP - PUBLIC
HEALTH 
(a) Argyll and Bute Health and Social Care Partnership - Public Health Update 
Consideration was given to a public health update from Argyll and Bute Health and
Social Care Partnership’s Public Health Team on the ongoing wellbeing and
prevention activities overseen and delivered by them in Argyll and Bute. The update
provided information on the Argyll and Bute Public Health Annual Report; the
development of children and young people’s health and wellbeing profiles; ongoing
health and wellbeing profile workshops; the Cool2Talk online support service for
young people; and the annual Director of Public Health Report, which will be
presented at the next cycle of the Area Community Planning Groups. 
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided. 
(Reference: Report by Health Improvement Lead, Argyll and Bute Health and Social
Page 11

Page 12

Care Partnership, submitted) 
(b) Presentation on Children and Young People's Health and Wellbeing Profiles 
The group gave consideration to a presentation by Jennifer Dryden, Health
Improvement Lead from Argyll and Bute Health and Social Care Partnership’s Public
Health Team, on the Children and Young People’s Health and Wellbeing Profile for
the Bute and Cowal area. The presentation provided information in relation to the
Profile themes; the purposes of the Profiles; the layout of the report and how to
navigate it; the reasons for any gaps in the Profiles; and the type of data in the
Profiles and ways in which this could be used by partners.
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided. 
(Reference: Presentation by Public Health Team, Argyll and Bute Health and Social
Care Partnership) 
7. DRAFT ARGYLL AND BUTE COMMUNITY JUSTICE PLAN 2023-2027 
Consideration was given to a presentation which provided information in relation to the
draft Argyll and Bute Community Justice Plan 2023-27. The report provided details in
relation to the National Strategy for Community Justice; the core membership of the
Community Justice Partnership; the overall strategic context of the Vision for Justice in
Scotland and National Strategy for Community Justice; the development of the
Community Justice Outcome Improvement Plan (CJOIP); the Community Justice
Pathways Assessment process; and the timescales for the consultation and publication of
the plan. 
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided. 
(Reference: Presentation by Community Justice Co-Ordinator, Argyll and Bute Council,
submitted) 
8. INCLUDEM - YOUTH JUSTICE 
Consideration was given to a presentation by David Gould, Associate Researcher,
Includem, in relation to Includem’s ADAPT Research Project. Information was provided in
relation to Includem’s background as a Scottish charity dedicated to providing 24-hour,
one-to-one support for young people and their families/carers; their normal operating
processes when assisting young people who may be in conflict with the law; and funding
from the Scottish Government’s Whole Family Wellbeing Fund to identify gaps and
opportunities in provisions for young people who are in potential or actual conflict with the
law. 
It was noted that Includem were engaging with services and organisations across
Scotland to identify gaps in current services and provisions for young people in order to
Page 12

Page 13

create pilot projects that could work alongside existing services. It was noted that 12 broad
themes had been identified across Scotland in relation to youth justice, with a variety of
factors identified in relation to this and Includem were planning to design pilot projects
around local needs. The Associate Researcher provided examples of current pilot
projects, including bail support; structured deferred sentencing support; and restorative
justice. 
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided. 
(Reference: Leaflet by Includem, submitted and Presentation by Associate Researcher,
Includem, tabled) 
9. PARTNER UPDATES 
(a) Police Scotland Update 
Consideration was given to an update which provided information on the ongoing
work of the Service and information on yearly crime statistics; fraud prevention and
awareness, specifically relating to scam calls; personal safety inputs provided to
Lomond and Argyll Advocacy Service staff; the success at the Divisional
Recognition Awards 2023 and the support on the 16 days Against Gender Based
Violence campaign.
Inspector Simonis highlighted the online safety webinar in conjunction with
Neighbourhood Watch Scotland being held on the 27 February and it was noted that
information on how to join had already been circulated to the group.
Discussion took place in relation to the ongoing consultation concerning proposals to
close a number of Police Scotland properties across the country. Partners raised
various concerns over the anticipated loss of service within the Bute and Cowal
locality and neighbouring divisions.  
Decision 
The Bute and Cowal Area Community Planning Group:
1. considered and noted the information provided; and
2. agreed that the Committee Manager would highlight to the Community Planning
Partnership Management Committee, the concerns of the group regarding the
proposed changes referenced within the engagement on proposed estate
disposals.
(Reference: Report by Police Scotland, submitted) 
(b) Scottish Fire and Rescue Service Update 
The group gave consideration to a report highlighting the Scottish Fire and Rescue
Service’s (SFRS) FQ3 review of local performance across Bute and Cowal for the
period 2023-24. The report included information on the local firefighter training plan;
incidents during this time period; unwanted fire alarm signals; road and water safety
campaigns; community engagement activities; East and West Dunbartonshire and
Page 13

Page 14

Argyll and Bute Local Senior Officer Activities and home fire safety. 
Chris Spence also provided information in relation to the British Heart Foundation’s
application process for the supply and maintenance of defibrillators. He noted that
applications were now open, and encouraged local community groups to apply. A
link with information in relation to the application process is provided below: 
https://www.bhf.org.uk/how-you-can-help/how-to-save-a-life/defibrillators/apply-for-a-
free-defibrillator-for-your-community 
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided. 
(Reference: Report by Scottish Fire and Rescue Service, submitted) 
(c) Live Argyll Community Learning Services Update 
The group gave consideration to a written update from Rhona Grant, Live Argyll -
Community Learning Services. The update provided information relating to adult
literacy and numeracy provision; the HMI Community Learning and Development
Progress Visit of Argyll and Bute Council; the newly elected MSYPs for Argyll and
Bute and the findings from the consultation for youth’s living on Bute.
Decision 
The Bute and Cowal Area Community Planning Group:
1. considered and noted the information provided; and 
2. noted that in the absence of a representative from Live Argyll Community
Learning Services, any questions could be forwarded to them following the
meeting and any responses circulated to the group.
(Reference: Report by Live Argyll Community Learning Services, submitted) 
(d) UHI Argyll Update 
Consideration was given to a written update from UHI Argyll. The update included
information on January start courses that are available; the multiply programme
which aims to support adults with no or low level maths skills get back into work and
the open day held on 11 January which was well attended at both the Dunoon and
Rothesay Centres and it was noted that another open day was provisionally
scheduled for mid-March.
Decision 
The Bute and Cowal Area Community Planning Group:
1. considered and noted the information provided; and 
2. noted that in the absence of a representative from UHI Argyll, any questions
could be forwarded to them following the meeting and any responses circulated
to the group.
(Reference: Report by UHI Argyll, dated 22 January 2024, submitted)
Page 14

Page 15

(e) Argyll and Bute TSI Update 
Consideration was given to an update from Janis Marshall Reilly from Argyll and
Bute TSI. The update included information in relation to funding grants from the
Communities Mental Health and Wellbeing Fund 2023-24; the commissioning of a
Community Wealth Building strategy and action plan as part of the Argyll and Bute
Community Planning Partnership; funding available from the Argyll and Bute Climate
Action Network Fund; future consultation and development of a TSI Strategy for
2024-29; the launch of the new TSI website on 20th February; and work with the
SCVO on a fairer funding campaign.
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided.
(Reference: Report by Argyll and Bute TSI, dated January, submitted) 
(f) Opportunity for Verbal Updates 
Argyll and Bute Council’s Community Development Team 
Ailie Law highlighted that the Community Development Team had recruited Aimie
Dow as the new Community Development Officer for Bute and Cowal, advising that
Aimie will be job sharing with her. Ailie also advised that a new Engagement and
Communities Lead, Suzanne Mason had been recruited last year. Ailie concluded in
highlighting that the Supporting Communities fund would be launched this week with
applications open until mid-March. 
Dunoon Gourock Ferry Action Group 
Robert Trybis advised that 6 Community Councils were now backing Professor Neil
Kay’s proposal to reintroduce a vehicle ferry service. He has also invited local
Elected Members to meet with the Ferry Action Group and Community Councils to
find out if there is progress on the leasing of the linkspan. 
Councillor Sinclair, Argyll and Bute Council 
Councillor Sinclair raised road safety concerns on the A815 through Sandbank and
advised that there had been a further accident on that stretch of road. The
Committee Manager advised that he had relayed the concerns of the group to the
CPP Management Committee and that an update on potential road safety measures
for Sandbank would be provided by the Roads Department at the next meeting of
the group. 
(g) Argyll and Bute Citizens Advice Bureau Update 
Consideration was given to an update from Argyll and Bute Citizen’s Advice Bureau
which provided statistical information on the number of clients who had contacted
the Bureau between January and December 2023; the Volunteer Advisor training
programme; the annual programme of energy efficiency advice sessions and
services that the Bureau provide. 
Page 15

Page 16

Decision 
The Bute and Cowal Area Community Planning Group: 
1. considered and noted the information provided; and 
2. noted that in the absence of a representative from Argyll and Bute Citizens
Advice Bureau, any questions could be forwarded to them following the meeting
and any responses circulated to the group.
(Reference: Report by Argyll and Bute Citizens Advice Bureau, submitted) 
10. SHAPING PLACES FOR WELLBEING 
Consideration was given to an update from Alex Wilde and Becky Hothersall from Shaping
Places for Wellbeing Dunoon. It was highlighted that at the end of March the Community
Link Lead Becky Hothersall would be leaving to take on a new role with Poverty Alliance. 
The update provided information on inequality groups; how they share their learning;
Place and Wellbeing Assessments and training opportunities; the Active Travel Plan for
Dunoon; public transport discussions and a data led decision-making update.
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided.
(Reference: Report by Project Lead, Shaping Places for Wellbeing, Dunoon, submitted) 
11. COMMUNITY FOCUS 
(a) Friends of Glenan Wood 
Consideration was given to a presentation by Rhyddian Knight of Friends of Glenan
Wood. Rhyddian highlighted that the woodlands is 148 hectares of unique Atlantic
temperate rainforest which is managed by a small volunteer board in which he is the
only full time employee and that his role is primarily community engagement.  Mr
Knight advised that they have just finalised their programme for the year and are
working on rebuilding their website to include an online booking page.
Rhyddian highlighted that the location of the woodlands is on the Cowal Way and
right at the ferry terminal which brings opportunities for visitors as well as locals. It
was noted that funding is a challenge for the woodlands.
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided. 
(Reference: Presentation by Forrest Ranger, Friends of Glenan Wood) 
Page 16

Page 17

12. CLIMATE CHANGE 
(a) Climate Change Working Group Update 
The group considered a report from the Climate Change Project Manager, which
provided an update on the Community Planning Partnership’s Argyll and Bute
Climate Action project. The update included information in relation to the
background and work of the Climate Change Working Group; funding requirements
to support the implementation of a Climate Change Project Manager post; an
overview of the work of the Climate Change Project Manager to date and future
plans; collaboration with the Argyll & Bute Climate Action Network Hub; and updated
governance arrangements for the Climate Change Working Group. 
Decision 
The Bute and Cowal Area Community Planning Group noted the approach and
status of the project, as outlined in the report. 
(Reference: Report by Climate Change Project Manager, ACT Now, dated 6
February 2024, submitted) 
(b) Opportunity for verbal updates on community based initiatives 
Robert Trybis advised of an issue he had come across while out driving where a
burn that crosses the A815 had burst its banks resulting in water flowing down to
properties. He advised that the pipe under the road was not blocked but could not
divert the volume of water. 
13. AREA PLANS UPDATE 
Consideration was given to a presentation by the Corporate Support Manager from Argyll
and Bute Council, in relation to the Council’s Area Plans. The presentation provided
background information in relation to the Plans, as well as details of the 8 Locality Plans
across Argyll and Bute, and the purpose and principles of the Plans. The presentation also
included context about the scope of the Plans; the importance of community engagement
and efficient use of resources in the development of the plans; the overall approach,
governance and phasing of the Plan’s development; and the ways in which information
from the development of the Plans would be utilised. 
The Corporate Support Manager noted that it was hoped that the Area Plans would
maximise the opportunities for funding for local projects. It was anticipated that the Plans
would be developed and owned by the communities, and the Area Community Planning
Groups would have an important part to play in the development of the Plans. He
emphasised that the Plans were not seeking to take ownership of projects away from local
community groups. 
The presentation provided details of how partners could assist with the Area Plans by
identifying community groups in the area; identifying physical locations suitable for hosting
consultation documents; and encouraging community partners to engage with the
development process. The Corporate Support Manager advised that he would provide a
list of currently identified community groups for circulation to the Group following the
meeting, in order to reduce duplication in identifying any additional groups for consultation. 
Page 17

Page 18

Discussion was had around the importance of Area Plans and the need for this to be
subject to discussion at a future meeting of the Area Community Planning Group. 
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
information provided. 
(Reference: Presentation by Corporate Support Manager, Argyll and Bute Council,
submitted) 
14. DATE OF NEXT MEETING 
The Group noted that the next meeting of the Bute and Cowal Area Community Planning
Group would take place on Tuesday 30 April 2024. 
Page 18

Page 19

MINUTES OF THE MEETING OF THE COWAL TRANSPORT FORUM HELD BY MICROSOFT
TEAMS 
ON TUESDAY, 12 DECEMBER 2023 
Present: Councillor Daniel Hampsey (Chair) 
Councillor Ross Moreland
Stuart McLean, Committee Manager, Argyll and Bute Council
Captain Alistair McLundie, Western Ferries
Neil MacFarlane, Transport Scotland
Neil Stewart, West Coast Motors
Allan Comrie, Strathclyde Partnership for Transport (SPT)
Inspector Bart Simonis, Police Scotland
David Clough, Dunoon Community Council
Frauke Thornton, Dunoon Community Council
Kerris Bone, Kilmun Community Council
Tom Murray, Lochgoilhead Community Council
Kirstie Reid, Strachur Community Council
Gordon Ross, Western Ferries
Ronald McAlister, Bute Ferry Group
Tommy Gore, Calmac 
Attending: Robert Trybis, Dunoon Gourock Ferry Action Group 
1. APOLOGIES FOR ABSENCE 
The Chair welcomed everyone to the meeting. 
Apologies for absence were received from: 
Councillor Audrey Forrest;
Councillor William Sinclair;
Graham Revill, Kilmun Community Council;
Michael Breslin, South Cowal Community Council; and
Dave Cooper, Hunters Quay Community Council. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. MINUTES 
The minutes of the meeting of the Cowal Transport Forum held on Wednesday 13
September 2023 were approved as a correct record. 
The Chair passed on his thanks to all Council staff and Partners who responded to the
disruption caused by the severe weather events on and around the 7 October and advised
of a planned roundtable meeting with Jenni Minto MSP, Scotrail, Calmac and Local
Page 19 Agenda Item 3c

Page 20

councillors to discuss related transport issues. Councillor Hampsey also advised of the
proposed Active Travel route for Dunoon. 
4. FERRIES UPDATE 
(a) Travel Subsides - Discussion led by David Clough, Dunoon Community
Council 
David Clough from Dunoon Community highlighted that he had attended the Bute
and Cowal Area Community Planning Group in August and that Mr Ross of Western
Ferries had attended and had suggested that if Western Ferries had access to the
same level of subsidies offered to Calmac, Western Ferries fares could be halved
and a direct Dunoon/Glasgow bus introduced.   
Mr Clough highlighted that connectivity is crucial for the area with their being a lack
of integration between existing ferry services and the rail network. Mr Clough also
suggested that Transport Scotland would not be retendering the ferry contract which
would likely be awarded to Calmac. 
Mr Ross advised that he believes that the current annual subsidy for the Dunoon to
Gourock service amounted to around £5 million which equated to around £25 per
passenger. 
Robert Trybis reported that Harbours fees out weight the operational cost of the ferry
and that it is the wish of the Dunoon Gourock Ferry Action Group and 5 Community
Councils that Argyll and Bute Council and CMAL agree a long term lease of the
Linkspan. 
Kerris Bone advised that as a frequent user of Western Ferries she had not seen
any more than five foot passengers on the service and that the Dunoon Linkspan is
very important. 
Kirstie Reid advised she had attended the Clyde, Kintyre and the Islands Ferry
Stakeholder Group and had noted some concerns around ferry users onward
journeys via Scotrail services being interrupted due to poor timetabling. Alan Comrie
advised that timetables had been revised and that the ferries dock at 15 and 45
minutes past the hour with associated rail services departing at 26 and 56 minutes
past the hour. The Chair raised a similar concern on behalf of Councillor William
Sinclair. 
Outcome 
The Forum: 
1. noted the information provided; and 
2. noted that the Chair would contact relevant stakeholders to explore the possibility
of holding a meeting, early in 2024, to discuss the most cost effective way of
improving connectivity between Dunoon Town Centre and Gourock Railway
Station. 
(b) Opportunity for verbal updates by Cowal Transport Forum Members 
Page 20

Page 21

Western Ferries 
Gordon Ross advised that Western Ferries had issues with one of their vessels
during the early part of December but all four vessels were now back in operation.
Mr Ross highlighted that the Christmas timetable was now agreed with limited
services over Christmas, Boxing day and the 1st and 2nd January with the timetable
available on Western Ferries website. 
Outcome 
The Forum noted the update from Western Ferries. 
Calmac 
Tommy Gore advised that the MV Ali Cat had recently been unavailable as it was
undergoing an annual overhaul and that the two vessel service has since returned.
Mr Gore highlighted that due to three separate technical events the Dunoon
Linkspan was unusable and as such a replacement bus service had been provided. 
Kerris Bone raised concerns around the way in which ferry disruptions were
advertised, adding that older people do not always have access to the website to
find this out. 
Outcome 
The Forum noted the update from Calmac and that further consideration would be
given to the way in which ferry disruptions are advertised. 
5. PUBLIC TRANSPORT 
(a) Public Transport Update 
A written update on Public Transport had been provided from the Contract Officer at
Argyll and Bute Council. The update provided information on a request from the
NHS to provide further bus services serving Cowal Community Hospital; requests
from Community interest groups; discussions with West Coast Motors on options for
serving North Campbell Road and the possibility of providing a Saturday afternoon
service to Strachur; consideration of later bus services from Dunoon to Ardentinny
and the luggage capacity of the Dunoon Grammar School/Hostel bus. 
Outcome 
The Forum noted the update from the Contract Officer, Argyll and Bute Council. 
(b) Opportunity for verbal updates by Cowal Transport Forum Members 
West Coast Motors 
Neil Stewart provided the Forum with an update on the services being delivered by
West Coast Motors. Neil advised that there had been a drop in concessionary fare
users although there had been an uplift in under 22s travelling. Mr Stewart
highlighted that West Coast Motors strive to make the service better for all users
however they are limited in the mileage they can provide, consequently if a new
Page 21

Page 22

route is added the mileage would have to be removed from another. 
Mr Stewart advised 68% of all Pingo users were over 60s, 11% were fair payers and
only 21% were 5-15 year olds. 
Outcome 
The Forum noted the update from West Coast Motors. 
6. ROADS UPDATE 
(a) Opportunity for verbal updates by Cowal Transport Forum Members 
Kirstie Reid advised that the road at Loch Eck recently been flooded on both sides
and asked when the white lines would be reinstated on the Hamilton Street/Victoria
Road. 
Tom Murray asked for an update on the B828 Glenmore road which had been shut
since October. 
The Committee Manager advised that Dave Cooper had raised the matter of the
signage on Marine Parade and advised that it was his understanding that a new
local roads officer would be in post shortly and would pick this up. 
Frauke Thornton highlighted the new laws for parking on pavements and lowered
kerbs had recently been introduced and that, as far as she was aware, Argyll and
Bute Council would not be enforcing this. Miss Thornton advised that this is a
particular problem at the Queens Hall, Dunoon with people parking on lowered kerbs
and in front of the War Memorial. 
Kirstie Reid advised that she had heard that all traffic wardens in Argyll and Bute
were in a meeting about parking on the pavements and would be issuing tickets. 
Outcome 
The Forum noted that the Chair would raise these issues with the responsible
Council Department and update Partners accordingly. 
7. POLICE SCOTLAND 
Inspector Bart Simonis had to leave the meeting prior to this agenda item, the Committee
Manager provided the following update on his behalf: 
I have contacted all of the Speed Watch volunteers and asked for their permission to
submit disclosure forms to Police Scotland Disclosure team, I am still waiting on several
replies and will send out the disclosure forms after Christmas. 
Kirsty Reid, Strachur Community Council advised that people are continuing to cycle
along the pavements on Argyll Street, Dunoon which is causing danger for the elderly
people. 
Outcome
Page 22

Page 23

The Forum noted that the information provided by Police Scotland. 
8. TRANSPORT SCOTLAND 
Neil MacFarlane provided the Forum with a verbal update, advising that the resurfacing
along the A83 at various locations from Arrochar to Campbeltown was almost finished and
that the resurfacing programme would recommence in February for a further 3 weeks. Mr
MacFarlane advised that Bear Scotland were aware of the potholes outside the Loch Long
Hotel and that there has been a significant number of flooding issues reported along the
A83.   
Kerris Bone highlighted that Kilmun is very dangerous due to a significant number of road
works and many raised culverts. 
Outcome 
The Forum: 
1. noted the update from Transport Scotland; and 
2. noted that the Committee Manager would contact the Roads Department in relation to
the culverts reported along Kilmun. 
9. ANY OTHER COMPETENT BUSINESS 
There was no other competent business. 
10. DATE OF NEXT MEETING 
The Chair thanked everyone in attendance at the meeting and the Group noted that the
Committee Manager would circulate a calendar invite for a meeting, week beginning 18
March 2024 in due course. 
Page 23

Page 24

This page is intentionally left blank

Page 25

1 
ARGYLL AND BUTE COUNCIL BUTE AND COWAL AREA
COMMITTEE 
CUSTOMER SUPPORT SERVICES   5 MARCH 2024 
AREA PERFORMANCE REPORT – FQ3 2023/24 
1.0 BACKGROUND 
1.1 This paper presents the Area Performance Report for Financial Quarter 3 2023/24
(October to December 2023) and illustrates the agreed performance measures.   
1.2 The features of the Performance Report are as follows:- 
➢ Indicators are grouped by Corporate Outcome.
➢ The data table for each indicator is colour coded to identify the level of
reporting.
o Area level measures are blue
o Council level measures are grey
o COI measures are white 
➢ Each indicator details the
o Target, Actual and Performance status (Green / Red / No Target) for the
current and four previous financial quarters.
o Commentary for the current financial quarter only.
o Narrative explaining the performance trend e.g.This indicator is above
Target and performance has improved since the last reporting period.
o Where appropriate a Performance Trend Line has been added.
o The name of the Responsible Officer.
o Where possible performance is presented at both Area and Council
level. 
1.3 The commentary for each indicator helps ‘Tell Our Story’ and enables Elected
Members to put the performance data into perspective and understand if an issue is
local in nature or should be escalated up to a Strategic Committee. 
1.4 To improve the response to performance queries, it is requested that either the
Responsible Named Officer or Sonya Thomas are contacted once the Quarterly
Performance Report is received with any queries. This should enable some
queries being resolved or clarified prior to the Area Committee meeting, and
therefore being carried forward as Actions at a subsequent meeting. 
1.5 As part of our improvements to performance reporting and making best use of the
digital technology available to us, officers have developed new, online scorecards
for members to view performance data. If support is required to navigate the online
scorecards please contact - 
lorna.gillies@argyll-bute.gov.uk or sonya.thomas@argyll-bute.gov.uk 
Page 25 Agenda Item 5

Page 26

2 
2.0 RECOMMENDATIONS 
2.1 It is recommended that the Area Committee – 
a) Notes and considers the performance and supporting commentary as
presented. 
b) Upon receipt of the Quarterly Performance Report the Area Committee
contact either the Responsible Named Officer or Sonya Thomas with any
queries. 
c) Note that work is ongoing and to respond to Sonya Thomas with requests
or comments regarding the layout and format of the Performance Report. 
3.0 IMPLICATIONS 
3.1 Policy All of the indicators in this report are based on 
agreed Council policy.
3.2 Financial All indicators with financial implications are actively  
managed through agreed budget monitoring 
processes.
3.3 Legal All appropriate legal implications are complied with.
3.4 HR All HR implications are actively managed    
through agreed Wellbeing and Management 
monitoring processes.
3.5 Fairer Scotland Duty See below.
3.5.1 Equalities All activities comply with Equal Opportunities/Fairer 
Scotland Duty policies and obligations.
3.5.2 Socio-economic Duty All activities comply with the council’s socio- 
economic duty.
3.5.3 Islands Duty All activities comply with the council’s islands 
duty.
3.6 Climate Change The Council is committed to working towards net 
zero.
3.7 Risk Without this information Elected Members are less  
informed of activities within their area.
3.8 Customer Service All activities with customer feedback or insight are  
rigorously monitored for improvement.
3.9 The Rights of the Child (UNCRC): This report highlights examples of how the  
Council is committed to, and working towards reducing  
child poverty and improving outcomes for every child.   
Kirsty Flanagan, Executive Director with responsibility for Customer Support
Services 
Jane Fowler
Head of Customer Support Services
7 February 2024 
Page 26

Page 27

3 
For further information, please contact:
Sonya Thomas
Organisation Development Project Officer - Customer Support Services
01546 604454 
Appendix 1: FQ3 2023/24 B&C Performance Report 
Page 27

Page 28

This page is intentionally left blank

Page 29

Appendix 1
Page 1 
All Areas 
FQ3 2023/24 Overall Performance Summary 
The information presented is a summary of the agreed measures. 
Unless stated otherwise, performance is presented at both Area and Council-wide levels. 
The measures show the performance against target for the current and previous three reporting periods with an explanation of performance trend. 
The data table for each indicator is colour coded to identify the level of reporting: 
 Area level measures are blue.
 Council level measures are grey.
 Corporate Outcome Indicators (COIs) are white. 
Where appropriate a Trend Line has been added to illustrate movement in ‘Actual’ over the reporting period.  
Page 29

Page 30

Appendix 1
Page 2 
Performance Reporting
All Areas .................................................................................................................................................................................................................................................. 1
Performance Reporting .............................................................................................................................................................................................................................. 2
Corporate Outcome No.1 – People live active, healthier and independent lives ............................................................................................................................ 5
COI – Maximise distribution of Scottish Welfare Fund ................................................................................................................................................................. 5
Corporate Outcome No.1 – People live active, healthier and independent lives ............................................................................................................................ 6
COI – Percentage of clients satisfied that they are better able to deal with their financial problems following our support and intervention ...................... 6
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................... 7
Number of parking penalty notices issued – Bute and Cowal ...................................................................................................................................................... 7
Number of parking penalty notices issued – Argyll and Bute ....................................................................................................................................................... 8
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................... 9
Car parking income to date – Bute and Cowal .............................................................................................................................................................................. 9
Car parking income to date – Argyll and Bute ............................................................................................................................................................................. 11
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................. 12
Dog fouling – total number of complaints – Bute and Cowal ..................................................................................................................................................... 12
Dog fouling – total number of complaints – Argyll and Bute ...................................................................................................................................................... 13
Corporate Outcome No.3 – Children and young people have the best possible start ................................................................................................................... 14
COI – Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring plans in place .... 14
Corporate Outcome No.3 – Children and young people have the best possible start ................................................................................................................... 15
COI – Provide quality meals with cost margins to all pupils ....................................................................................................................................................... 15
Corporate Outcome No.4 – Education, skills and training maximises opportunities for all .......................................................................................................... 16
Maximise the percentage of 16-19 years olds participating in education, training or employment – Bute and Cowal .......................................................... 16
Maintain the percentage of 16-19 years olds in Argyll and Bute participating in education, training or employment services – Argyll and Bute ................ 17
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 18
Number of affordable social sector new builds completed per annum – Bute and Cowal ....................................................................................................... 18
Page 30

Page 31

Appendix 1
Page 3 
Number of affordable social sector new builds completed per annum – Argyll and Bute ........................................................................................................ 19
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 20
Percentage of pre-planning application enquiries processed within 20 working days – Bute and Cowal ................................................................................ 20
Percentage of pre-planning application enquiries processed within 20 working days – Argyll and Bute ................................................................................ 21
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 22
Householder planning applications – average number of weeks to determine – Bute and Cowal ........................................................................................... 22
Householder planning applications – average number of weeks to determine – Argyll and Bute ........................................................................................... 23
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 24
COI – Number of new homeless applicants who required temporary accommodation this period ......................................................................................... 24
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 25
COI – Maintain the percentage of local suppliers that benefit from the awards of contracts via the procurement portal .................................................... 25
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 26
COI – Increase the number of community benefits that are delivered through contracts we award locally ........................................................................... 26
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 27
Street lighting – percentage of faults repaired within 10 days – Bute and Cowal ..................................................................................................................... 27
The percentage of street lighting faults are completed within 10 working days – Argyll and Bute .......................................................................................... 28
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 29
Total number of complaints regarding waste collection – Bute ................................................................................................................................................. 29
Total number of complaints regarding waste collection – Cowal ............................................................................................................................................... 29
Total number of complaints regarding waste collection – Argyll and Bute ............................................................................................................................... 30
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 31
COI – Percentage of waste recycled, composted and recovered ................................................................................................................................................ 31
Renewi (formerly Shanks) – Percentage of waste recycled, composted and recovered ........................................................................................................... 32
Islands – Percentage of waste recycled, composted and recovered .......................................................................................................................................... 33
H&L – Percentage of waste recycled, composted and recovered ............................................................................................................................................... 34
Page 31

Page 32

Appendix 1
Page 4 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 35
COI – The number of tonnes of waste sent to landfill ................................................................................................................................................................. 35
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 36
LEAMS (Local Environment Audit and Management System) – Bute ......................................................................................................................................... 36
LEAMS (Local Environment Audit and Management System) – Cowal ...................................................................................................................................... 36
LEAMS (Local Environment Audit and Management System) – Argyll and Bute ....................................................................................................................... 37
Making It Happen ............................................................................................................................................................................................................................. 38
Teacher sickness absence – Bute and Cowal ............................................................................................................................................................................... 38
Teacher sickness absence – Argyll and Bute ................................................................................................................................................................................ 39
Making It Happen ............................................................................................................................................................................................................................. 40
LGE staff (non-teacher) sickness absence – Bute and Cowal ...................................................................................................................................................... 40
LGE staff (non-teacher) sickness absence – Argyll and Bute ....................................................................................................................................................... 41
Making It Happen ............................................................................................................................................................................................................................. 42
COI – Increase the percentage of all self-service automated contacts ....................................................................................................................................... 42 
Page 32

Page 33

Appendix 1
Page 5 
Corporate Outcome No.1 – People live active, healthier and independent lives 
COI – Maximise distribution of Scottish Welfare Fund 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ3 2022/23 95.3% 129.2% Green
FQ4 2022/23 95.3% 144.0% Green
FQ1 2023/24 95.3% 112.9% Green
FQ2 2023/24 95.3% 134.3% Green
FQ3 2023/24 95.3% 138.2% Green 
Performance in FQ3 has exceeded the target and actual has increased since the last reporting period. 
FQ3 Comment 
Projected spend for the programme for 2023/24 is £670,000.  A paper will be issued to Policy & Resources in February outlining the issue around the level of spend and also asking
for support in lobbying the Scottish Government for more programme funding for future years. 
Responsible person: Fergus Walker
Page 33

Page 34

Appendix 1
Page 6 
Corporate Outcome No.1 – People live active, healthier and independent lives 
COI – Percentage of clients satisfied that they are better able to deal with their financial problems following our support and
intervention 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ3 2022/23 100% 100% Green
FQ4 2022/23 100% 95% Red
FQ1 2023/24 100% 100% Green
FQ2 2023/24 100% 100% Green
FQ3 2023/24 100% 100% Green 
This indicator for FQ3 has met the target with no change in performance since the last reporting period. 
FQ3 Comment 
This is a voluntary survey with no obligation for clients to respond either in full or in part. It is also common for incomplete returns to be received. In FQ3 2023/24,
11 survey forms were distributed to clients. 6 were returned. Of these 6 returns, 5 responded to the question relating to being better able to deal with their
financial problems. Of these 5 respondees, 5 responded positively, whilst 0 responded negatively. Accordingly, 100% of clients that responded were positive about
their experience i.e. no negative comments or responses were reported. 
Responsible person: Lee Roberts
Page 34

Page 35

Appendix 1
Page 7 
Corporate Outcome No.2 – People live in safer and stronger communities 
Number of parking penalty notices issued – Bute and Cowal 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 403 No target 
FQ4 2022/23 No target 415 No target
FQ1 2023/24 No target 296 No target
FQ2 2023/24 No target 257 No target
FQ3 2023/24 No target 226 No target 
This indicator for FQ3 shows the number of parking penalty notices has decreased since the last reporting period. 
FQ3 Comment 
Free parking two weeks prior to Christmas.  Amenity Wardens off-work between 24 Dec to 3 Jan (non-essential staff).  Lining/signing continuing to deteriorate,
which means wardens are unable to enforce. Operations have been made aware and are looking to get the lining redone when lining teams are available and
weather permitting. 
Responsible person: Hugh O’Neill 
Page 35

Page 36

Appendix 1
Page 8 
Number of parking penalty notices issued – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 1,343 No target 
FQ4 2022/23 No target 1,332 No target
FQ1 2023/24 No target 1,816 No target
FQ2 2023/24 No target 1,172 No target
FQ3 2023/24 No target 1,015 No target 
This indicator for FQ3 shows the number of parking penalty notices has decreased since the last reporting period. 
FQ3 Comment 
Free Parking around Christmas Period, amount depending on location.  Lining issues continue.  Amenity Wardens (as non-essential staff) not operating at
Christmas break. Lining/signing continuing to deteriorate, which means wardens are unable to enforce. Operations have been made aware and are looking to get
the lining redone when lining teams are available and weather permitting. 
Responsible person: Hugh O’Neill 
Page 36

Page 37

Appendix 1
Page 9 
Corporate Outcome No.2 – People live in safer and stronger communities 
Car parking income to date – Bute and Cowal 
Performance is presented cumulatively for both Area and Council-wide levels.  For individual car parks, the income is presented on a quarterly basis. 
Reporting Period Target
(Cumulative)
Actual
(Cumulative) Status
FQ3 2022/23 £70,063 £29,825 Red
FQ4 2022/23 £85,667 £42,381 Red
FQ1 2023/24 £20,912 £13,741 Red
FQ2 2023/24 £52,197 £34,027 Red
FQ3 2023/24 £71,239 £48,303 Red 
This indicator for FQ3 shows the cumulative amount of income collected is lower than the cumulative target.  There is no performance trend as this data is
cumulative.  
FQ3 Comment 
The severe weather has been a factor in reducing traffic movements in certain areas. This is most likely the reason for the drop in income seen over this quarter.
The two week free period of off street parking in the lead up to Christmas also can affect income. The Committee are asked to note that the installation of electric
charger installs is now complete. 
Responsible person: Hugh O’Neill 
Page 37

Page 38

Appendix 1
Page 10 
Actual quarterly income collected in Bute and Cowal for FQ2 and FQ3. 
Car Park Location FQ2 Actual FQ3 Actual
Guildford Street, Rothesay -£19 £204
Church Street, Dunoon £2,480 £0
Swimming Pool, Dunoon £2,703 £2,062
Dunoon Pier £880 £1,714
Moir Street, Dunoon £4,973 £3,446
Argyll Street, Dunoon £4,678 £2,817
Jane Villa, Dunoon £4,592 £4,033
B&C (parking permits) £0 £0
Total £20,287 £14,276 
Page 38

Page 39

Appendix 1
Page 11 
Car parking income to date – Argyll and Bute 
Performance is presented cumulatively for both Area and Council-wide levels. 
Reporting Period Target
(Cumulative)
Actual
(Cumulative) Status
FQ3 2022/23 £812,919 £709,585 Red
FQ4 2022/23 £993,968 £817,788 Red
FQ1 2023/24 £234,056 £253,705 Green
FQ2 2023/24 £584,204 £486,151 Red
FQ3 2023/24 £797,331 £807,348 Green 
This indicator for FQ3 is shows the cumulative amount of income collected is slightly higher than the cumulative target.  There is no performance trend as this data
is cumulative. 
FQ3 Comment 
There were delays in processing income from G4S which has seen parts of the income placed into the wrong cost codes. Officers have worked with Finance to
identify this and the extra income has been pulled through into this quarter. We have also fitted new parking machines which are easier to use. This may well have
increased usage and subsequently income. 
Going forward the Committee are asked to note the following factors that will affect car parking income: 
B&C: No issues.
H&L: Glen Loin 2 has (incomplete) electric charger installs (from June), which is affecting 2 bays.  
MAKI: No issues.
OLI: North Pier car park closures for cruise ship visits (FQ1 onwards). 
Responsible person: Hugh O’Neill
Page 39

Page 40

Appendix 1
Page 12 
Corporate Outcome No.2 – People live in safer and stronger communities 
Dog fouling – total number of complaints – Bute and Cowal 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 19 No target 
FQ4 2022/23 No target 25 No target
FQ1 2023/24 No target 13 No target
FQ2 2023/24 No target 11 No target
FQ3 2023/24 No target 14 No target 
This indicator for FQ3 is shows the number of dog fouling complaints has increased since the last reporting period. 
FQ3 Comment 
The number of dog fouling complaints has risen only slightly this quarter, with 4 complaints received for the Isle of Bute and 10 for the Cowal area.  The warden
service will continue to patrol and monitor in an attempt to reduce the number of complaints. 
Responsible person: Tom Murphy 
Page 40

Page 41

Appendix 1
Page 13 
Dog fouling – total number of complaints – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 47 No target 
FQ4 2022/23 No target 77 No target
FQ1 2023/24 No target 60 No target
FQ2 2023/24 No target 51 No target
FQ3 2023/24 No target 46 No target 
This indicator for FQ3 is shows the number of dog fouling complaints has decreased since the last reporting period. 
FQ3 Comment 
The number of dog fouling complaints this quarter has reduced from 51 to 46.  In order to reduce this further the Warden Service will continue to monitor and
patrol.  Islay was the only area this quarter to issue a dog fouling fine. 
Responsible person: Tom Murphy 
Page 41

Page 42

Appendix 1
Page 14 
Corporate Outcome No.3 – Children and young people have the best possible start 
COI – Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring
plans in place 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ3 2022/23 100% 100% Green
FQ4 2022/23 100% 100% Green
FQ1 2023/24 100% 100% Green
FQ2 2023/24 100% 100% Green
FQ3 2023/24 100% 100% Green 
This indicator for FQ3 is has met the target with no change in performance since the last reporting period. 
FQ3 Comment 
Each care experienced child and young person enrolled in an authority school has tracking and monitoring plans in place via our SEEMIS database.  Data collated
includes attendance, exclusion, progress and attainment and wellbeing information. 
Our systems continue to be refined to ensure data is relevant and supports early intervention.  A bespoke tracking and monitoring system is in development. 
Improvements to date include: programme of data driven dialogue between Designated Managers and the Virtual Head Teacher, discreet identification of CECYP
for class teachers and appropriate data sharing with partner agencies. Raising the profile of our CECYP has led to an increased awareness of this cohort, positively
impacting on personalised support, including at transition points. 
Responsible person: Louise Chisholm 
Page 42

Page 43

Appendix 1
Page 15 
Corporate Outcome No.3 – Children and young people have the best possible start 
COI – Provide quality meals with cost margins to all pupils 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ3 2022/23 +/-5.00% 6.09% Red
FQ4 2022/23 +/-5.00% -2.56% Green
FQ1 2023/24 +/-5.00% 5.00% Green
FQ2 2023/24 +/-5:00% -7.07% Red
FQ3 2023/24 +/-5:00% 4.12% Green 
This indicator for FQ3 is within the +/-5.00% target variance and performance has improved since the last reporting period. 
FQ3 Comment 
The overall food cost percentage for the authority was 4.12%. We will continue to monitor areas and individual schools that have a variance out with the +/-5%
target. 
B&C  0.54%
H&L -0.52%
MAKI -2.82%
OLI  6.92% 
Responsible person: Christine Boyle 
Page 43

Page 44

Appendix 1
Page 16 
Corporate Outcome No.4 – Education, skills and training maximises opportunities for all 
Maximise the percentage of 16-19 years olds participating in education, training or employment – Bute and Cowal 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 94.00% 92.17% Red 
FQ4 2022/23 94.00% 91.80% Red
FQ1 2023/24 94.00% 92.19% Red
FQ2 2023/24 94.00% 94.34% Green
FQ3 2023/24 94.00% 92.97% Red 
This indicator for FQ3 is below target and performance has decreased since the last reporting period. 
FQ3 Comment 
As of 1st December 2023, the Participation figure (16-19 year-olds in employment, training or education) in Bute and Cowal was 860 young people, which equates
to 92.97%.  This is 1.03% below target and 2.63% below the annual Argyll and Bute Participation figure of 95.60%, which was released by Skills Development
Scotland at the end of August 2023.  The Participation figure of 92.97% for FQ3 of 2023/24 is a decrease of 1.37% on the Participation figure for FQ2 2023/24. 
Responsible person: Jennifer Crocket 
Page 44

Page 45

Appendix 1
Page 17 
Maintain the percentage of 16-19 years olds in Argyll and Bute participating in education, training or employment services – Argyll and
Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 94.00% 93.90% Red 
FQ4 2022/23 94.00% 93.62% Red
FQ1 2023/24 94.00% 93.75% Red
FQ2 2023/24 94.00% 95.94% Green
FQ3 2023/24 94.00% 94.37% Green 
This indicator for FQ3 is above target however performance has decreased since the last reporting period. 
FQ3 Comment 
As of 1st December 2023, the Participation figure (16-19 year-olds in employment, training or education) for the whole of Argyll and Bute was 3909 young people,
which equates to 94.37%. This is 0.37% above target and 1.23% below the annual Argyll and Bute Participation figure of 95.60%, which was released by Skills
Development Scotland at the end of August 2023. The Participation figure of 94.37% for FQ3 of 2023/24 is a decrease of 1.57% on the Participation figure for FQ2
2023/24. 
Responsible person: Jennifer Crocket 
Page 45

Page 46

Appendix 1
Page 18 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Number of affordable social sector new builds completed per annum – Bute and Cowal 
Reporting Period Target Actual Status
FQ3 2022/23 0 0 Green
FQ4 2022/23 0 0 Green
FQ1 2023/24 0 0 Green
FQ2 2023/24 0 0 Green
FQ3 2023/24 4 4 Green 
This indicator for FQ3 shows the number of completions has met the target for the reporting period. 
FQ3 Comment 
In FQ3 - 4 x particular needs units completed by ACHA in Dunoon 1x2bed, 1x3bed, 2x4bed. 
Responsible person: Kelly Ferns 
Page 46

Page 47

Appendix 1
Page 19 
Number of affordable social sector new builds completed per annum – Argyll and Bute 
Reporting Period Target Actual Status
FQ3 2022/23 37 37 Green
FQ4 2022/23 67 67 Green
FQ1 2023/24 26 26 Green
FQ2 2023/24 40 40 Green
FQ3 2023/24 4 4 Green 
This indicator for FQ3 shows the number of completions has met the target for the reporting period. 
FQ3 Comment 
In FQ3 - 4 x particular needs units completed by ACHA in Dunoon 1x2bed, 1x3bed, 2x4bed.
B&C 4
H&L 0
MAKI 0
OLI 0 
Responsible person: Kelly Ferns 
Page 47

Page 48

Appendix 1
Page 20 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Percentage of pre-planning application enquiries processed within 20 working days – Bute and Cowal 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 75.0% 50.0% Red 
FQ4 2022/23 75.0% 55.6% Red
FQ1 2023/24 75.0% 27.3% Red
FQ2 2023/24 75.0% 16.7% Red
FQ3 2023/24 75.0% 21.4% Red 
This indicator for FQ3 is below target however, performance has increased since the last reporting period. 
FQ3 Comment 
Performance across the Development Management Service continues to be impacted as it works through a backlog of casework that has accumulated through the
Covid pandemic and which has been exacerbated by extended periods of operating with reduced staffing levels due to issues with recruitment to vacant posts,
and the introduction of National Planning Framework 4. Whilst vacancies across the service have now largely been filled the focus of officer remains geared
toward the resolution of statutory casework with the handling of pre-application enquiries afforded lower priority in caseload management. To assist with the
management of reduced customer expectations the target for responding to pre-app enquiries has been temporarily extended to 6 weeks. During FQ3 14 pre-apps
were responded to within B&C. 35.7% were issued within 6 weeks. 
Responsible person: Peter Bain 
Page 48

Page 49

Appendix 1
Page 21 
Percentage of pre-planning application enquiries processed within 20 working days – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 75.0% 52.5% Red 
FQ4 2022/23 75.0% 55.4% Red
FQ1 2023/24 75.0% 47.5% Red
FQ2 2023/24 75.0% 49.1% Red
FQ3 2023/24 75.0% 55.0% Red 
This indicator for FQ3 is below target however, performance has increased since the last reporting period. 
FQ3 Comment 
Performance across the Development Management Service continues to be impacted as it works through a backlog of casework that has accumulated through the
Covid pandemic and which has been exacerbated by extended periods of operating with reduced staffing levels due to issues with recruitment to vacant posts,
and the introduction of National Planning Framework 4. Whilst vacancies across the service have now largely been filled the focus of officer remains geared
toward the resolution of statutory casework with the handling of pre-application enquiries afforded lower priority in caseload management. To assist with the
management of reduced customer expectations the target for responding to pre-app enquiries has been temporarily extended to 6 weeks. During FQ3 120 pre-
apps were responded to across ABC. 62.5% were issued within 6 weeks. 
Responsible person: Peter Bain 
Page 49

Page 50

Appendix 1
Page 22 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Householder planning applications – average number of weeks to determine – Bute and Cowal 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 8.0 weeks 8.1 weeks Red 
FQ4 2022/23 8.0 weeks 20.2 weeks Red
FQ1 2023/24 8.0 weeks 30.1 weeks Red
FQ2 2023/24 8.0 weeks 28.3 weeks Red
FQ3 2023/24 8.0 weeks 23.5 weeks Red 
This indicator for FQ3 is above target (lower is best) and performance has improved significantly since the last reporting period. 
FQ3 Comment
This measure only relates to planning applications received for alterations to existing premises. 
Performance across the Development Management Service continues to be impacted as it works through a backlog of casework that has accumulated through the
Covid pandemic and which has been exacerbated by extended periods of operating with reduced staffing levels due to issues with recruitment to vacant posts,
and the introduction of National Planning Framework 4. Improving resource availability has allowed the focus of the DM Service to shift from the prioritisation of
the most significant applications to addressing the accrued backlog of older applications. The determination of a higher-than-normal volume of older cases has a
significant impact on "average time taken" performance measures as a relatively small number of older cases can skew the outcome. It is also noted that these
performance measures are based on "raw data" and as such have not been adjusted to take into account delays to determination out with the control of the
planning authority. FQ3 has seen the determination of 3 'legacy' applications and an increasing volume of newer case work. This has resulted in a significant
improvement with the average time period for determination of householder applications reducing by 3 weeks from FQ2. 87% of applications determined in FQ3
were less than 6 months old; these items were determined in an average time of 12.0 weeks. 
Responsible person: Peter Bain 
Page 50

Page 51

Appendix 1
Page 23 
Householder planning applications – average number of weeks to determine – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 8.0 weeks 12.0 weeks Red 
FQ4 2022/23 8.0 weeks 17.3 weeks Red
FQ1 2023/24 8.0 weeks 21.6 weeks Red
FQ2 2023/24 8.0 weeks 18.1 weeks Red
FQ3 2023/24 8.0 weeks 16.8 weeks Red 
This indicator for FQ3 is above target (lower is best) and performance has improved since the last reporting period. 
FQ3 Comment
This measure only relates to planning applications received for alterations to existing premises. 
Performance across the Development Management Service continues to be impacted as it works through a backlog of casework that has accumulated through the
Covid pandemic and which has been exacerbated by extended periods of operating with reduced staffing levels due to issues with recruitment to vacant posts,
and the introduction of National Planning Framework 4. Improving resource availability has allowed the focus of the DM Service to shift from the prioritisation of
the most significant applications to addressing the accrued backlog of older applications. The determination of a higher-than-normal volume of older cases has a
significant impact on "average time taken" performance measures as a relatively small number of older cases can skew the outcome. It is also noted that these
performance measures are based on "raw data" and as such have not been adjusted to take into account delays to determination out with the control of the
planning authority. FQ3 has seen the determination of 3 'legacy' applications and an increasing volume of newer case work. This has resulted in a significant
improvement with the average time period for determination of householder applications reducing by 3 weeks from FQ2. 87% of applications determined in FQ3
were less than 6 months old; these items were determined in an average time of 12.0 weeks. 
Responsible person: Peter Bain 
Page 51

Page 52

Appendix 1
Page 24 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Number of new homeless applicants who required temporary accommodation this period 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 41 No target 
FQ4 2022/23 No target 30 No target
FQ1 2023/24 No target 32 No target
FQ2 2023/24 No target 36 No target
FQ3 2023/24 No target 26 No target 
This indicator for FQ3 shows the number of applicants has decreased since the last reporting period. 
FQ3 Comment 
During FQ3, the housing service provided temporary accommodation for 26 new homeless households.  B&C: 16 households (4 x Registered Social Landlord
Property, 1 x Private Sector Property, 8 x Serviced Accommodation, 3 x Bed & Breakfast).  H&L: 1 household (1 x Private Sector Property).  MAKI: 3 households (3 x
Private Sector Properties).  OLI: 6 households (3 x Private Sector Properties, 3 x Supported Accommodation). 
Please note: 
• The Registered Social Landlord and Private Rented Sector properties are leased by the Council and sub-let to homeless households as temporary
accommodation.
• Serviced Accommodation is available in Cowal and Helensburgh and is for single people providing an en-suite bedroom and shared kitchen facilities.
• Supported accommodation is provided in Lorn by Blue Triangle Housing Association. 
B&C: 16 
H&L: 1 
MAKI: 3 
OLI: 6 
Responsible person: Morven Macintyre 
Page 52

Page 53

Appendix 1
Page 25 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Maintain the percentage of local suppliers that benefit from the awards of contracts via the procurement portal 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 20.0% 19.4% Red 
FQ4 2022/23 20.0% 22.5% Green
FQ1 2023/24 20.0% 10.8% Red
FQ2 2023/24 20.0% 26.5% Green
FQ3 2023/24 20.0% 27.8% Green 
This indicator for FQ3 is above target and performance has increased since the last reporting period. 
FQ3 Comment 
FQ3 has shown a further increase. From the 18 contracts awarded, 7 local suppliers submitted a bid, 5 of which were successful. The Procurement, Commercial
and Contract Management Team will continue to support local suppliers by providing useful information on the Council's website. 
Responsible person: Anne MacColl-Smith 
Page 53

Page 54

Appendix 1
Page 26 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Increase the number of community benefits that are delivered through contracts we award locally 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ3 2022/23 No target - No target
FQ4 2022/23 No target 43 No target
FQ1 2023/24 No target - No target
FQ2 2023/24 No target 37 No target
FQ2 2023/24 No target - No target 
This indicator is reported in FQ2 and FQ4. 
This indicator for FQ3 shows the number of community benefits has increased since the last reporting period. 
FQ3 Comment
Reported on a six monthly basis.  
FQ3 and FQ4 will be reported in April 2024. 
Responsible person: Anne MacColl-Smith 
Page 54

Page 55

Appendix 1
Page 27 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
Street lighting – percentage of faults repaired within 10 days – Bute and Cowal 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 75% 33% Red 
FQ4 2022/23 75% 30% Red
FQ1 2023/24 75% 54% Red
FQ2 2023/24 75% 45% Red
FQ3 2023/24 75% 37% Red 
This indicator for FQ3 is below target however performance has decreased since the last reporting period. 
FQ3 Comment 
Overall Argyll and Bute performance figure of 46% during a period where annual leave and sickness absence have been prevalent in the small lighting team.  This is
a slight improvement on the previous quarter but it is still having a negative impact on our performance this quarter. 
Responsible person: Tom Murphy 
Page 55

Page 56

Appendix 1
Page 28 
The percentage of street lighting faults are completed within 10 working days – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 75% 30% Red 
FQ4 2022/23 75% 32% Red
FQ1 2023/24 75% 37% Red
FQ2 2023/24 75% 43% Red
FQ3 2023/24 75% 46% Red 
This indicator for FQ3 is below target however performance has increased slightly since the last reporting period. 
FQ3 Comment 
We maintain 14,442 street lights throughout Argyll and Bute, including the islands.  Some street lighting faults cannot be fixed by the Street Lighting Team and we
require assistance from power suppliers (SSE or Scottish Power) or our Roads colleagues/external contractors to repair underground cable faults and power supply
issues.  These type faults are often reported as single dark lamps but following attendance/investigation they can be identified as more serious problems that will
take longer to repair.  On average throughout the year approximately 98.8% of our street lights are operating/functioning as designed.  Our Maintenance Team
comprises 3x Street Lighting Electricians, 1x Clerk of Works/Inspector and 1x Trainee Team Leader.  At present around 95% of assets have been upgraded to
Energy Efficient and more reliable LED Luminaires.  Works are continuing to convert/upgrade the rest of our inventor. 
Responsible person: Tom Murphy 
Page 56

Page 57

Appendix 1
Page 29 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
Total number of complaints regarding waste collection – Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 1 No target 
FQ4 2022/23 No target 3 No target
FQ1 2023/24 No target 1 No target
FQ2 2023/24 No target 0 No target
FQ3 2023/24 No target 2 No target 
This indicator for FQ3 shows the number of waste collection complaints has increased since the last reporting period. 
FQ3 Comment 
There were only 2 waste collection complaints received for the Isle of Bute this quarter.  This is a very good level of service given the number of bins serviced.
Responsible person: Tom Murphy 
Total number of complaints regarding waste collection – Cowal 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 1 No target 
FQ4 2022/23 No target 3 No target
FQ1 2023/24 No target 9 No target
FQ2 2023/24 No target 20 No target
FQ3 2023/24 No target 2 No target 
This indicator for FQ3 shows the number of waste collection complaints has decreased significantly since the last reporting period. 
FQ3 Comment 
For the Cowal area there were only 2 waste collection complaints received this quarter, a very good service.
Responsible person: Tom Murphy
Page 57

Page 58

Appendix 1
Page 30 
Total number of complaints regarding waste collection – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 35 No target 
FQ4 2022/23 No target 53 No target
FQ1 2023/24 No target 67 No target
FQ2 2023/24 No target 101 No target
FQ3 2023/24 No target 18 No target 
This indicator for FQ3 shows the number of waste collection complaints has decreased significantly since the last reporting period. 
FQ3 Comment 
For the months of October, November and December only 18 waste collection complaints were received.  Given the number of bins serviced, domestic,
commercial, recycling, glass and food this is a very good level of service. 
Responsible person: Tom Murphy 
Page 58

Page 59

Appendix 1
Page 31 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
COI – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 45.0% 56.7% Green 
FQ4 2022/23 45.0% 52.0% Green
FQ1 2023/24 45.0% 47.6% Green
FQ2 2023/24 45.0% 59.8% Green
FQ3 2023/24 45.0% 49.0% Green 
This indicator for FQ3 is above target however performance has decreased since the last reporting period. 
FQ3 Comment 
49.0% recycling, composting and recovery (36.1% recycling/composting plus 12.9% recovery). Renewi sent some general waste to an energy from waste plant as
part of a trial during December 23, which has improved recovery figures and reduced landfill during the quarter. Year to date figures are 53.3% recycling,
composting and recovery (44.1% recycling/composting plus 9.2% recovery). 
Responsible person: John Blake 
Page 59

Page 60

Appendix 1
Page 32 
Renewi (formerly Shanks) – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 67.4% No target 
FQ4 2022/23 No target 61.9% No target
FQ1 2023/24 No target 53.0% No target
FQ2 2023/24 No target 68.7% No target
FQ3 2023/24 No target 55.3% No target 
This indicator for FQ3 shows the percentage of waste recycled has decreased since the last reporting period. 
FQ3 Comment 
55.3% recycling, composting and recovery (33.9% recycling/composting plus 21.4% recovery). Renewi sent some general waste to and energy from waste plant as
part of a trial during December 23 which has improved recovery figures and reduced landfill during the quarter. Year to date figures are 60.9% recycling,
composting and recovery (46.5% recycling/composting plus 14.4% recovery). 
Responsible person: John Blake 
Page 60

Page 61

Appendix 1
Page 33 
Islands – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 43.5% No target 
FQ4 2022/23 No target 35.9% No target
FQ1 2023/24 No target 39.2% No target
FQ2 2023/24 No target 35.6% No target
FQ3 2023/24 No target 34.2% No target 
This indicator for FQ3 shows the percentage of waste recycled has decreased since the last reporting period. 
FQ3 Comment 
34.2% recycling, composting and recovery. Year to date figures are 36.4% recycling, composting and recovery (36.4% recycling/composting and 0% recovery). 
Responsible person: John Blake 
Page 61

Page 62

Appendix 1
Page 34 
H&L – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 37.5% No target 
FQ4 2022/23 No target 34.5% No target
FQ1 2023/24 No target 40.1% No target
FQ2 2023/24 No target 41.6% No target
FQ3 2023/24 No target 41.5% No target 
This indicator for FQ3 shows the percentage of waste recycled has decreased slightly since the last reporting period. 
FQ3 Comment 
41.5% recycling, composting and recovery (40.8% recycling/composting plus 0.7% recovery). Year to date figures are 41.0% recycling, composting and recovery
(40.8% recycling/composting and 0.2% recovery). 
Responsible person: John Blake 
Page 62

Page 63

Appendix 1
Page 35 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
COI – The number of tonnes of waste sent to landfill 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 5,100 3,882 Green 
FQ4 2022/23 5,000 4,610 Green
FQ1 2023/24 5,850 5,075 Green
FQ2 2023/24 5,550 5,510 Green
FQ3 2023/24 5,100 4,253 Green 
This indicator for FQ3 is below target (lowest is best). 
FQ3 Comment 
Within target. Landfill reduction of biodegradable waste tonnes to landfill is partly due to Renewi sending some general waste to an energy from waste plant as
part of a trial during December 23. This has helped reduce landfill during the quarter. 
Responsible person: John Blake 
Page 63

Page 64

Appendix 1
Page 36 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
LEAMS (Local Environment Audit and Management System) – Bute
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 73 80 Green 
FQ4 2022/23 73 79 Green
FQ1 2023/24 73 79 Green
FQ2 2023/24 73 76 Green
FQ3 2023/24 73 80 Green 
This indicator for FQ3 is above target and performance has increased since the last reporting period. 
FQ3 Comment 
The LEAMS figure for the Isle of Bute has again exceeded the National and Benchmarking figures, showing a good level of street cleanliness. 
Responsible person: Tom Murphy 
LEAMS (Local Environment Audit and Management System) – Cowal
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 73 76 Green 
FQ4 2022/23 73 77 Green
FQ1 2023/24 73 77 Green
FQ2 2023/24 73 77 Green
FQ3 2023/24 73 77 Green 
This indicator for FQ3 is above target with no change in performance since the last reporting period. 
Page 64

Page 65

Appendix 1
Page 37 
FQ3 Comment
The Cowal areas street cleanliness has remained steady this quarter with a score of 77. 
Responsible person: Tom Murphy 
LEAMS (Local Environment Audit and Management System) – Argyll and Bute
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 73 83 Green 
FQ4 2022/23 73 83 Green
FQ1 2023/24 73 84 Green
FQ2 2023/24 73 83 Green
FQ3 2023/24 73 85 Green 
This indicator for FQ3 is above target and performance has increased slightly since the last reporting period. 
FQ3 Comment 
The overall level of street cleanliness this quarter is very good indeed with a score of 85.  LEAMS was originally designed to gain a measure of street cleanliness
and effectiveness of service provision, to keep land free from litter and refuse, keep roads clean, this includes weeds, graffiti, staining, flyposting and vandalism.   
Responsible person: Tom Murphy 
Page 65

Page 66

Appendix 1
Page 38 
Making It Happen 
Teacher sickness absence – Bute and Cowal 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 2.36 days No target 
FQ4 2022/23 No target 3.61 days No target
FQ1 2023/24 No target 3.64 days No target
FQ2 2023/24 No target 2.00 days No target
FQ3 2023/24 No target 3.72 days No target 
This indicator for FQ3 shows the number of sickness absence days has increased since the last reporting period. 
FQ3 Comment 
The commentary provided for sickness absence compares the data against the same period in the previous year to allow for seasonal fluctuations. 
B&C Teacher absence has risen by 1.36 day per FTE on the same quarter last year.  The top reasons are mental health, medical treatment and
stomach/kidney/digestion issues.  The top reason and third reason is consistent with the overall top 3 reasons but Medical Treatment is the second reason. 
Quarter 2 absence is traditionally low for Teachers as this is the summer holiday period and an increase against this quarter is traditionally seen. 
Responsible person: Jennifer Crocket 
Page 66

Page 67

Appendix 1
Page 39 
Teacher sickness absence – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 1.70 days No target 
FQ4 2022/23 No target 2.48 days No target
FQ1 2023/24 No target 2.15 days No target
FQ2 2023/24 No target 1.25 days No target
FQ3 2023/24 No target 2.82 days  No target 
This indicator for FQ3 shows the number of sickness absence days has increased since the last reporting period. 
FQ3 Comment 
The commentary provided for sickness absence compares the data against the same period in the previous year to allow for seasonal fluctuations. 
Overall Teacher absence has risen by 1.12 day per FTE on the same quarter last year.  The top 3 reasons are mental health, infections and
stomach/kidney/digestive reasons.  Infections and Stomach issues are characterised by short term absence types such as Covid, flu, cold, upset stomach, vomiting
and gastroenteritis.  The top 3 reasons are consistent with the same quarter last year albeit in higher numbers of days lost.  On the last quarter (Q2) there has
been an increase of 1.5 days. Traditionally quarter 2 has low absence rates due to the summer holiday period. 
Responsible person: Jennifer Crocket (B&C and MAK) and Wendy Brownlie (H&L and OLI) 
Page 67

Page 68

Appendix 1
Page 40 
Making It Happen 
LGE staff (non-teacher) sickness absence – Bute and Cowal 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 3.97 days No target 
FQ4 2022/23 No target 4.65 days No target
FQ1 2023/24 No target 4.46 days No target
FQ2 2023/24 No target 3.50 days No target
FQ3 2023/24 No target 4.42 days No target 
This indicator for FQ3 shows the number of sickness absence days has increased since the last reporting period. 
FQ3 Comment 
The commentary provided for sickness absence compares the data against the same period in the previous year to allow for seasonal fluctuations. 
B&C LGE absence has increased by 0.45 day per FTE on the same quarter last year.  The top reasons for absence are mental health, back and neck problems and
stomach/kidney/digestive issues.  There has been an increase in absence on the last quarter which follows the traditional pattern as Q2 is the summer holiday
period. 
Responsible person: Carolyn Cairns 
Page 68

Page 69

Appendix 1
Page 41 
LGE staff (non-teacher) sickness absence – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 3.65 days No target 
FQ4 2022/23 No target 4.04 days No target
FQ1 2023/24 No target 3.53 days No target
FQ2 2023/24 No target 3.18 days No target
FQ3 2023/24 No target 3.73 days  No target 
This indicator for FQ3 shows the number of sickness absence days has increased since the last reporting period. 
FQ3 Comment 
The commentary provided for sickness absence compares the data against the same period in the previous year to allow for seasonal fluctuations. 
Overall absence has stayed almost the same as the same quarter last year.  It has increased slightly on FQ2 but traditionally we see this pattern with FQ2 being the
summer holiday period.  The top three reasons for absence were mental health, infections and other Musculoskeletal/back and neck problems. 
Responsible person: Carolyn Cairns 
Page 69

Page 70

Appendix 1
Page 42 
Making It Happen 
COI – Increase the percentage of all self-service automated contacts 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 70.0% 72.5% Green 
FQ4 2022/23 70.0% 72.2% Green
FQ1 2023/24 70.0% 80.7% Green
FQ2 2023/24 70.0% 72.1% Green
FQ3 2023/24 70.0% 72.7% Green 
This indicator for FQ3 is above target and performance has increased since the last reporting period. 
FQ3 Comment 
In FQ3 there was 34,254 transactions dealt with by Customer Service Agents (27.3%) and 91,264 automated or self-service transactions (72.7%) so the 70.0%
target was exceeded. 
Responsible person: Robert Miller  
Page 70

Page 71

1 
Argyll and Bute Council 2023 - 2024    
‘Our Children, Their Future’
Education Service 
Primary Area Attainment Report:  
Bute and Cowal (B&C)
March 2024
Page 71 Agenda Item 6

Page 72

2 
Introduction
Within the Bute and Cowal area there are 14 Primary Schools, three on Bute and 11 in Cowal.  There is
secondary school provision at Dunoon Grammar School and Rothesay Joint Campus.  Nursery provision is
provided within several of these schools and Gaelic Medium Education is provided at Sandbank Primary
School.  Primary school rolls in Bute and Cowal vary considerably ranging from 11 pupils (Kilmodan PS) to
298 (Kirn PS). 
This report provides a range of key information about school provision from June 2023 to January 2024
and reports the National collection of attainment and achievement data from June 2023. 
Additional and more detailed information about each school can be found in the schools’ Standards and
Quality Reports.  In addition, each school’s Improvement Plan outlines their main priorities for
improvement.  Most schools have an active website where these documents can be accessed and
further links or information can be obtained from the Head Teacher.   
Page 72

Page 73

3 
Bute and Cowal School Profiles 2022-2023
Cluster Primary Schools 19/20 20/21 21/22 22/23  23/24
%
change
in Roll
over 5
years1
Dunoon Primary School 203 191 187 186 198 -2%
Inellan Primary School 28 29 41 38 15 -46%
Kilmodan Primary School 14 17 19 12 11 -21%
Kirn Primary School 274 273 252 270 298 9%
Lochgoilhead Primary School 25 29 23 21 24 -4%
North Bute Primary School 36 38 39 26 27 -25%
Rothesay Primary 254 249 240 246 241 -5%
Sandbank primary School 70 62 56 60 39 -15%
Sandbank Primary School Gaelic
Unit 46 52 51 45 64 -9%
St Andrew’s Primary 50 58 56 71 77 54%
St Mun’s Primary School 99 87 77 68 33 -67%
Strachur Primary 27 27 31 27 26 -4%
Strone Primary School 20 23 25 21 24 20%
Tignabruaich Primary School 40 45 55 66 67 68%
Toward Primary School 27 21 21 19 23 -15%
Total Roll for cluster 1213 1201 1173 1176 1167 -4% 
* Data for rolls provided at Census each year 
1 Please note the % change in Roll over 5 years shows the percentage change in roll figures from 2019/20 to 2023/24
and is not an average. 
SIMD Profile 
SIMD is the Scottish Government's standard approach to identify areas of multiple deprivation in Scotland,
with SIMD 1 indicating areas of highest deprivation and SIMD 10 indicating the least deprived.  It can help
improve understanding about the outcomes and circumstances of people living in the most deprived areas
in Scotland. It can also allow effective targeting of resources and funding where the aim is to wholly or
partly tackle or take account of area concentrations of multiple deprivation.   
Table shows percentage of pupils residing in each decile of the SIMD in each area of Argyll and Bute. 
Area 1 2 3 4 5 6 7 8 9 10
Unkn
own
Bute and
Cowal 16.6% 12.9% 18.7% 8.9% 21.4% 16.0% 2.3% 0.0% 1.5% 0.0% 1.7%
HALCO 2.6% 6.3% 6.0% 3.2% 7.5% 13.6% 16.7% 21.9% 11.0% 8.7% 2.3%
MAKI 0.0% 6.8% 8.3% 10.4% 9.2% 42.3% 22.6% 0.0% 0.0% 0.0% 0.4%
OLI 1.3% 0.0% 0.2% 10.5% 25.9% 17.8% 27.0% 7.9% 0.0% 0.0% 9.4% 
* SIMD data from January 2024 
Page 73

Page 74

4 
Footwear and Clothing Grant and Free School Meal Information for AREA 
 Clothing and Footwear Grant (CFG) is not shown as a National Average as each authority set their own
criteria and therefore cannot be compared accurately. Please note that 2022-20223 data for CFG and
Free School Meals (FSM) is to date (end December 2023) and therefore may change as the year
progresses. 
 In January 2022, the Scottish Government launched the extension of free school meal universal
eligibility to include all children in primary 1-5. The above figures only show those pupils in P6 and P7. 
 In August 2021 the Scottish Government introduced a School clothing grant minimum for all authorities
set at £120 for Primary pupils and £150 for Secondary pupils. 
 During session 2020/21 the Scottish Government introduced ‘Bridging’ payments of £130 per pupil in
receipt of FSM under the National criteria (this excludes anyone eligible who receive FSM in P1 to P6
who do not qualify financially). These payments are made 4 times per year (Easter, Summer, October
and Christmas).Further information can be found at Scottish Child Payment Bridging Payments -
mygov.scot.  In addition to this anyone eligible for these payments have been paid a FSM payment
during the school holiday period. Further information School meals - mygov.scot 
Page 74

Page 75

5 
Exclusion and Attendance Information for Bute and Cowal 
*2022-23 data taken from previous AC report up to Feb 2023 - Session 2022-23 under embargo by SG
**2023-24 Data up to end December 2023 
 Authorised absence includes bereavement, short – term exceptional domestic situations, religious
observance, weddings of immediate family. Unauthorised absence includes truancy, unexplained
absence and most family holidays during term time. Attendance and absence is outlined in the recently
updated Management Circular 3.03.
 There have been no primary school exclusions in the locality between August 2023 and January 2024. 
 During 2020/21 there were additional attendance codes added for COVID. These codes can count as
attendance, authorised absence or unauthorised absence depending on the circumstance.
 Please note that attendance & exclusion data for 2022/23 is up to 28 February and not a complete
year. Due to SG Embargo
 Please note that attendance & exclusion data for 2023/24 is up to end December 2023 and not a
complete year. It is therefore subject to change.
 Pupil attendance has been highlighted nationally as a concern. Significant work at authority level has
been undertaken to maximise pupil attendance. This includes the formation of a strategic group and
working party, refreshed policy and guidance, staff training, a media campaign highlighting the impact
of non-attendance and individual school attendance targets. All of these aspects are working together
to ensure a sharpened focus and emphasis on pupil attendance. 
Page 75

Page 76

6 
Additional Support needs 
Table below indicates the numbers of pupils identified as having Additional Support needs across the Bute
and Cowal area at each stage of primary schools. 
Care Experienced Children and Young People
A Virtual Head Teacher took up post in April 2023. The core purpose of the role of the Virtual Head Teacher
is to be relentless in driving improvements in the educational progress and attainment/achievement of an
identified group of young people, including Care Experienced, across Argyll and Bute. The core function of
the Virtual Head Teacher in terms of planning is to ensure that all children have access to appropriate and
timely support achieved by collaborating with relevant professionals to ensure plans are of a high quality,
with impact and outcomes followed up. 
The table below shows the numbers of care experienced children in our primary schools across each area
of the Council as of January 2024. 
Page 76

Page 77

7 
Attainment of Curriculum for Excellence Levels over time
Curriculum levels are national levels to describe different stages of learning and progress. For most
children the expectation is:       
Throughout the Broad General Education, children and young people are assessed and professional
judgements are made by teachers about when a child or young person has achieved learning at a particular
level. This means that they have broadly covered the experiences and achieved the expected outcomes for
that level. In making this decision, the teacher takes into account the evidence mentioned above, and
considers the benchmarks produced by Education Scotland for each level as well as diagnostic feedback
from the National Standardised Assessments (NSAs). Attainment of Curriculum for Excellence Levels
(ACEL) data is collected annually each June by the Scottish Government. The data collection collects
information on pupil performance in four areas, known as organisers. Organisers consist of Numeracy and
the three literacy components; Reading, Writing and Listening and Talking. A combined literacy measure is
also produced based on the three literacy organisers: reading, writing and listening and talking. The data is
collected for pupils at the key stages of P1, P4,P7 and S3. 
As an authority, we have made significant progress in raising attainment and closing the poverty related
attainment gap. Authority level data for literacy and numeracy demonstrating increased attainment is
displayed below. Further detail on progress towards closing the attainment gap between those residing in
Quintile 1 and those in Quintile 5 can be found on pages 10 and 11. 
Page 77

Page 78

8 
Achievement of Curriculum for Excellence Levels across Bute and Cowal schools: June
2018-June 2023 
Page 78

Page 79

9 
NOTES:
ER English reading, EW English writing, ELT English Listening and talking N Numeracy
GR Gaelic reading, GW Gaelic writing, GLT Gaelic Listening and talking.
There was no ACEL collection during session 2019/20 due to COVID 
In English medium by June 2022: 
 In reading, 68% of P1 pupils in the BUTE AND COWAL area achieved early level, this is
compared with 76% at authority level and 81% nationally.
 In writing, 64% of P1 pupils in the BUTE AND COWAL area achieved early level, this is
compared with 72% at authority level and 78% nationally
 In talking and listening, 74% of P1 pupils in the BUTE AND COWAL area achieved early
level, this is compared with 83% at authority level and 87% nationally. 
 In numeracy, 74% of P1 pupils in the BUTE AND COWAL area achieved early level, this
is compared with 79% at authority level and 85% nationally. 
 In reading, 72% of P4 pupils in the BUTE AND COWAL area achieved first level, this is
compared with 77% at authority level and 78% nationally
 In writing, 65% of P4 pupils in the BUTE AND COWAL area achieved first level, this is
compared with 70% at authority level and 72% nationally
 In talking and listening, 78% of P4 pupils in the BUTE AND COWAL area achieved first
level, this is compared with 85% at authority level and 85% nationally. 
 In numeracy, 65% of P4 pupils in the BUTE AND COWAL area achieved first level, this is
compared with 75% at authority level and 77% nationally. 
 In reading, 77% of P7 pupils in the BUTE AND COWAL area achieved second level, this
is compared with 77% at authority level and 81% nationally
 In writing, 70% of P7 pupils in the BUTE AND COWAL area achieved second level, this is
compared with 70% at authority level and 75% nationally
 In talking and listening, 86% of P7 pupils in the BUTE AND COWAL area achieved second
level, this is in line with the authority and national averages. 
 In numeracy, 73% of P7 pupils in the BUTE AND COWAL area achieved second level,
this is compared with 78% at authority level and 78% nationally. 
In Gaelic medium by June 2022: 
 In reading, 75% of P1 pupils in the BUTE AND COWAL area achieved early level, this is
compared with 75% at authority level and 84% nationally
 In writing, 100% of P1 pupils in the BUTE AND COWAL area achieved early level, this is
compared with 79% at authority level and 84% nationally
 In talking and listening, 100% of P1 pupils in the BUTE AND COWAL area achieved early
level, this is compared with 71% at authority level and 86% nationally. 
 In reading, 67% of P4 pupils in the BUTE AND COWAL area achieved first level, this is
compared with 62% at authority level and 73% nationally
 In writing, 67% of P4 pupils in the BUTE AND COWAL area achieved first level, this is
compared with 62% at authority level and 69% nationally
 In talking and listening, 100% of P4 pupils in the BUTE AND COWAL area achieved first
level, this is compared with 85% at authority level and 85% nationally. 
 In reading, 67% of P7 pupils in the BUTE AND COWAL area achieved second level, this
is compared with 62% at authority level and 73% nationally
 In writing, 67% of P7 pupils in the BUTE AND COWAL area achieved second level, this is
compared with 62% at authority level and 69% nationally
 In talking and listening, 100% of P7 pupils in the BUTE AND COWAL area achieved
second level, this is compared with 85% at authority level and 85% nationally. 
Page 79

Page 80

10 
Argyll and Bute Stretch Aims Session 2023-24 and onwards to 2026 (Authority Level)
The Scottish Attainment Challenge (SAC) is about achieving equity in educational outcomes, with a
particular focus on closing the poverty-related attainment gap.  SAC funding is provided to all of Scotland’s
local authorities to help tackle the attainment gap and support education recovery and improve outcomes
for children and young people most impacted by poverty. The Scottish Attainment Challenge aims to raise
the attainment of children and young people living in deprived areas, in order to close the equity gap.
Attainment Advisors within Education Scotland’s regional improvement teams, work with authorities to
identify core attainment measures and specific aims (Stretch Aims) which, informed by local evidence and
data, are identified as local priority areas for improvement. The stretch aims are intended to be both
ambitious and achievable within local contexts and targets are specific to individual authorities. Progress
towards achieving the current stretch aims will be reported on later in 2024. 
The Stretch Aims are intended to support recovery from the pandemic and accelerate progress in closing
the attainment gap and include:
 Achievement of Curriculum for Excellence Levels (literacy P1/4/7 combined and numeracy P1/4/7
combined)
The stretch aims for literacy and numeracy identify the percentage of young people who achieve their
expected Curriculum for Excellence (CfE) level:
 An overall attainment target, which includes all young people 
 An attainment target for young people who live in the most deprived areas (SIMD quintile 1)
 An attainment target for young people who live in the  least deprived areas (SIMD quintile 5)
 A target to reduce the attainment gap between the most and least deprived young people 
The Argyll & Bute literacy and numeracy tables illustrate data from the most recent ACEL collection in 2023
(published December 2023), against the stretch aim for 2022-23 and also indicate the stretch aim targets in
place for 2024-2026.
The year-on-year trend in ACEL data has been positive; in the two-year period between 2022 and 2023  the
overall proportions of primary school pupils achieving the expected levels in literacy had increased by 6
percentage points, while in numeracy there had been an increase of 3 percentage points.
The percentage of Quintile 1 (most deprived) young people who achieved their expected CfE level has
increased by 15pp in literacy and 8pp in numeracy between 2022 and 2023. 
Scottish Attainment Challenge - Stretch Aims 2023-26: Literacy
In literacy, the attainment gap between young people from the most and least deprived areas of Argyll &
Bute was 33 percentage points in 2021, by 2022 this narrowed to 27 percentage points and narrowed
further to 13 percentage points by June 2023, therefore achieving our stretch aim by 8.5 percentage points.
This is 7 percentage points below the national gap of 20pp.  Argyll & Bute’s target is to reduce the
attainment gap further to 11 percentage points by June 2024 and to 10 percentage points by June 2026. 
Scottish Attainment Challenge - Stretch Aims 2023-26: Numeracy 
Literacy (P 1/4/7 Combined) Stretch Aim 
Overall SIMD Q1 SIMD Q5 GAP (Q1-Q5)
Stretch aim
22/23
68.4% 60% 81.5% 21.5pp
Confirmed Dec
23
68% 68% 81% 13pp
Interim Stretch
Aim 2023/24
71% 70% 81% 11pp
Interim Stretch
Aim 2024/25
73.5% 72.5% 83% 10.5pp
Final Stretch
Aim 2025-26
76% 75% 85% 10pp
Page 80

Page 81

11 
In numeracy, the attainment gap between young people from the most and least deprived areas of Argyll &
Bute was 29 percentage points in 2021, by 2022 this narrowed to 18 percentage points and narrowed
further to 14 percentage points by June 2023. This was 3 percentage points below the national gap of
17pp.   Argyll & Bute’s target is to reduce the attainment gap to 13.5 percentage points by 2024 and to 13
percentage points by June 2026. 
The table below outlines the National expectations of when most children and young people may achieve
each level: 
CfE Level  Stage 
Early The final two years of early learning and
childcare before a child goes to school and
P1, or later for some. 
First To the end of P4, but earlier or later for
some. 
Second To the end of P7, but earlier or later for
some. 
Third and fourth S1-S3, but earlier or later for some. 
Further information: 
National Improvement Framework for Scottish Education –
https://www.gov.scot/policies/schools/national-improvement-framework/ 
Numeracy (P 1/4/7 Combined) Stretch Aim 
Overall SIMD Q1 SIMD Q5 GAP (Q1-Q5)
Stretch aim 22/23 69% 58% 87% 29pp
Confirmed Dec 2023 76.19% 76% 90% 14pp
Interim Stretch Aim
2023/24
78% 76.5% 90.5% 13.50pp
Interim Stretch Aim
2024/25
81% 77.75% 91% 13.25pp
Final Stretch Aim
2025-26
83% 78.5% 91.5% 13pp
Page 81

Page 82

12 
Initiatives to raise attainment and achievement 
In response to data and evidence gathered in the areas of literacy, numeracy and health and wellbeing, a
range of work has been undertaken in order to drive forward improvement and raise attainment and
achievement across the authority. 
Literacy
Quality Improvement Approach to writing
7 new schools have taken part in the training and implementation of this approach, impacting on 11
classes. 3 practitioners from 2 schools previously involved have also been trained, implementing the
approach in a further 3 classes. 100% of participants believe or strongly believe that the approach will have
a positive impact on their pupils. Data on impact to be gathered following the conclusion of the training in
February.
9 of the 10 schools involved in the initial stages of the programme are currently implementing some degree
of school spread with the approach to reach other stages, led by internal leads and supported in some
cases by the Education Support Officer (ESO). Evaluation of process and support with reflection of impact
is currently underway. 
Talk for Writing
Since August, 2 schools have been implementing the Talk for Writing approach across the whole school,
the approach aims to improve children’s ability to articulate their ideas for writing and support them to
ensure that they can then transfer these ideas onto paper. An additional school is implementing this at early
level with a clear plan for whole school implementation in August 2024. Clear aims have been set for each
class, the achievement of which will be measured following the next tracking and monitoring period. 
Progression Frameworks
Working groups have been set up for early, 1st and 2nd level to create our own Argyll and Bute progression
frameworks to support all staff with planning and monitoring progress. Listening and Talking have been
completed, with Reading and Writing still ongoing. These will ensure a consistency of approach across
schools and the authority and enable schools to further refine approaches to tracking progress of learners
through and across levels. 
School Support
The ESO continues to support schools on an individual basis. This includes: discussion of current curricular
approaches, delivery of training sessions for staff, teaching of model lessons and discussion of data. The
aim of this support is to improved experiences for learners, increase staff confidence and knowledge and
ultimately lead to raised attainment. 
Numeracy
From August 2023- January 2024 the following work has been undertaken in order to raise attainment in
mathematics and numeracy. These include but are not limited to: 
 Creation of a mathematics improvement plan, setting measurable goals and benchmarks to track
progress over time. 
 Work is underway to produce a mathematics framework to support mathematics and numeracy
teaching in Argyll and Bute schools. 
 Collaboration with colleagues to design and implement a customised professional learning
programme focused on the latest pedagogical approaches, research and best practices in
mathematics education. 
 Collaboration with members of the central team to analyse assessment data and develop strategies
for improving attainment and achievement in mathematics and numeracy, focussing on 2 schools as
an initial test of change. 
 Observations in targeted schools with focussed dialogue with practitioners and senior leaders on
strengths and next steps. Follow up support is then identified within a given timescale and is
coordinated by the numeracy lead. 
Page 82

Page 83

13 
Wellbeing , Rights and Relationships 
 The Glasgow Motivation and Wellbeing Profiling Tool has been introduced to schools as a way of
measuring pupil wellbeing.  Many schools have begun to use this, helping them to establish a sound
understanding of the environment created for learning. 
 
A focus on play pedagogy and outdoor learning alongside developments in the health and wellbeing
curriculum have also continued to be an important focus within school improvement plans to help
support wellbeing.
 
Through the UNICEF accredited Rights Respecting School journey, 36 schools have achieved
Bronze, 12 Silver, 6 Gold awards.  We will continue to provide support to schools to engage in this
award.  In taking a rights based approach to education, schools have been developing or
embedding pupil voice structures within their setting.
 
Food for Thought grants have been secured by two of our primary schools.  This is allowing schools
to develop enterprising and sustainable approaches to food with learners.  Both schools have
developed projects that involve a skills based approach to learning and connect our pupils to their
local community 
 Equality and diversity was a key feature of the Head Teacher conference in November.  Head
Teachers had the opportunity to engage in professional learning with Women’s Aid as part of Argyll
& Bute’s work to reduce violence against women and girls.  Education staff in a variety of roles have
also taken up the offer to participate in the Safe and Together training.   
 Time for Inclusive Education (TIE) have also delivered a session to Head Teachers to develop a
stronger understanding of what inclusive education is and raise awareness of the national
professional learning that all teaching staff have access to relating to LGBTQ+ issues. 
 A large number of our schools are continuing on their journey to becoming a ‘Nurturing School’
supported by our Educational Psychology service through the ‘Our Children, their Nurturing
Education’ programme. 22 schools have now achieved bronze accreditation, 6 have achieved silver
and 1 school has achieved gold. 
Page 83

Page 84

14 
School Contacts 
School  Head Teacher  Telephone No  
Dunoon  Brenda Reid  01369 704159 
Innellan  Lisa Marle  01369 830560 
Kilmodan  Megan Stirling  01369 820280 
Kirn
Kirsteen MacDonald 
(until March 24)  01369 702509 
Lochgoilhead  Louise Blair  01301 703338 
North Bute  Marie Law  01700 503728 
Rothesay Joint Campus  Louise Nicol  01700 503227
Sandbank
Gaelic Medium  Norman MacDonald  01369 706350 
Sandbank  Norman MacDonald  01369 706350 
St Andrew’s  Jacqueline Shields  01700 503123 
St Mun’s Brenda Reid  01369 703643 
Strachur  Marion Boyd  01369 860293 
Strone Julie Fish  01369 840242 
Tighnabruaich  Megan Stirling  01700 811413 
Toward  Lisa Marle  01369 870259 
Page 84

Page 85

15 
Page 85

Page 86

This page is intentionally left blank

Page 87

ARGYLL AND BUTE COUNCIL                 BUTE & COWAL AREA COMMITTEE 
ROADS AND INFRASTRUCTURE        5 MARCH 2024
SERVICES                     
ROADS AND INFRASTRUCTURE SERVICES UPDATE 
1.0 INTRODUCTION 
1.1 A Roads and Infrastructure standing report was a fixture on Area Committee
agendas throughout the life of the last Council. In the first two rounds of Area
Committee meetings in the new Council feedback was sought on the value of
these updates, and their format and frequency. Generally Members felt having a
standard item was beneficial and it was acknowledged that the Roads and
Infrastructure weekly briefings issued to all members each Friday afternoon
provide for the main sources of live information on current activities. On top of
these briefings there is a bank of resources on the new Member Zone system
which include the weekly briefings, subject specific briefings, ad hoc short
briefings on issues, relevant previous committee reports, operational service
procedures, legislation and Council policies. 
1.2 In the last Council the purpose of these reports was to provide an update on
service activities but since weekly briefings these have largely superseded the
original stated purpose of these reports. 
1.3 On the basis of the above this new format has been agreed through the
December 2022 round of area committees for this standing item. This format
removes duplication for Officers and rather links to existing published
information, with additional updates only in the body of the reports if these are
specifically requested/noted from previous meetings. The report remains as a
standing item and continues to provide the opportunity for Officer engagement at
the committee meetings.   
2.0 RECOMMENDATIONS 
It is recommended that the Area Committee: 
2.1 Note and consider the contents of this report. 
3.0 DETAIL 
3.1 Roads and Infrastructure Services provides Members with weekly briefings on
topical service activities which are all available here.  
Page 87 Agenda Item 7

Page 88

3.2 As part of the resources on the new Member Zone system there are various key
documents available in an online library here. 
3.3 There are also additional online resources covering the streetlighting, footway,
surface dressing and roads reconstruction programmes available on the website
here. 
4.0 CONCLUSION 
4.1 This report provides links to existing published information on service activities
and provides for the opportunity for Officer attendance and engagement at
committee meetings. 
5.0 IMPLICATIONS 
5.1 Policy – Roads and Infrastructure work to a number of policies across the range
of service areas 
5.2 Financial – revenue and capital budgets are in place to deliver projects and
cyclic work 
5.3  Legal – Roads and Infrastructure Services work to a number of different pieces
of legislation such as the Roads Scotland Act 194 and the Environmental
Protection Act 1990 
5.4  HR – none known 
5.5  Fairer Scotland Duty: 
5.5.1   Equalities - protected characteristics – where appropriate EqSEIAs will be
carried out to identify any implications 
5.5.2   Socio-economic Duty – where appropriate EqSEIAs will be carried out to
identify any implications 
5.5.3 Islands – where appropriate Island impacts assessments will be carried out to
identify any implications 
5.6. Climate Change – due regard will be given to climate change with a view to
minimising any climate change impact and these will be considered as and
when they arise 
5.7  Risk – risk managed through toolbox talks, safety briefings and where
appropriate risk registers – all of the above are monitored through the RIS
leadership and management teams 
5.8  Customer Service – none known
Page 88

Page 89

5.9  The Rights of the Child – none arising directly from this report. 
Executive Director with responsibility for Roads and Infrastructure Services,
Kirsty Flanagan 
Policy Lead for Roads and Transport, Councillor Andrew Kain 
January 2024 
For further information contact: 
Jim Smith, Head of Roads and Infrastructure Services 
Mark Calder, Project Manager 
Page 89

Page 90

This page is intentionally left blank

Page 91

ARGYLL AND BUTE COUNCIL                                                      BUTE AND COWAL 
AREA COMMITTEE 
ROADS AND INFRASTRUCTURE                           5 MARCH 2024
SERVICES                     
ROADS CAPITAL RECONSTRUCTION PROGRAMME 2024/25 
1.0  EXECUTIVE SUMMARY 
1.1 Attached to this report is a draft programme for roads reconstruction schemes for
2024/25 in the Bute and Cowal area. This programme has been designed using
the current Road Condition Index (RCI) which is produced by the national road
condition survey data. In addition to the RCI data, information such as road traffic
collisions, known development, activities such as timber harvesting and skid
condition (of the carriageways surface) which is measured by a separate survey
are also considered together with information brought forward from Elected
Members during agreed Area Business Days with officers from Roads and
Infrastructure Service. This information is considered at officer level when
appropriate engineering judgement is also applied to ensure that maximum
benefit can be derived from the available investment. 
1.2 The Roads Reconstruction Programme has been structured in line with the Roads
Asset Management and Maintenance Strategy. The focus has been to arrest the
rate of decline and provide an overall improvement in condition as has been
demonstrated in the Annual Status and Options Report. In previous years this has
been achieved through the delivery of a mix of carriageway resurfacing, edge
strengthening, patching/surface dressing and in-situ road surface recycling.
These treatments have been designed to seal the road to stop the ingress of
water, improve ride quality and reduce the number of reactive repairs. This has
resulted in an overall improvement in road conditions. Without this investment and
works there would have been a significant deterioration in condition and a
detriment to the travelling public, economic opportunity and tourism. 
1.3 Following the Council’s Budget Meeting, which took place on 22nd February
2024, £8M has been confirmed for the Capital Roads Reconstruction budget.   
1.4 As per previous years any post winter deterioration may result in some adjustment
to the programme to ensure that the best rates of return in terms of whole life
costs can be achieved. 
Page 91 Agenda Item 8

Page 92

2.0  RECOMMENDATION 
2.1 It is recommended that the Bute and Cowal Area Committee: 
• Provide comments on the draft programme that is contained in Appendix 1 of
this report.  
• Note that the programme will go forward to the Environment, Development
and Infrastructure Committee on 21 March 2024 for endorsement.   
3.0  DETAIL 
3.1  The focus of the roads reconstruction programme has been to recover the
network through the delivery of a mix of carriageway resurfacing schemes,
patching/surface dressing and in-situ road surface recycling, which follow the
principles set out within the Roads Asset Management Plan. 
3.2  This Council has approximately £122M of backlog maintenance (based on figures
produced by SCOTS) across the road network. This means that over £122M
would need to be invested to bring the road network up to an ‘A1’ standard. Most
councils are in a very similar position. During these challenging financial times, it
is very unlikely we will benefit from the level of investment required to bring the
road network up to an ‘A1’ condition. 
3.3  As in previous years, the proposed schemes have been selected using the
Councils Roads Asset database WDM Payment Management System (PMS)
using the information collected from the SCANNER Survey carried out in summer
months, other information mentioned above and engineering judgement. The
SCANNER surveys are carried out by a single contract for all 32 councils in Argyll
and Bute. Unfortunately, this year a small number of councils, including Argyll and
Bute, have not received a full network survey. In Argyll and Bute, the majority of
the islands have not been surveyed and this means that previous year’s data has
been used and qualified from safety inspection intelligence. Whilst this is not ideal,
Members should note that full network surveys are not carried out on an annual
basis, the frequency of surveys is detailed below: 
100% of the A Class roads are surveyed (in one direction)  
50% of the B Class roads  
25% of the C Class roads  
10% of the Unclassified road network  
3.4 The survey data will categorise roads from red to green, with red being in worst
condition and green not requiring attention. In-line with industry best practice,
investment is not necessarily concentrated on all the red roads but instead has
been aligned to focus on a combination of red and amber roads to arrest
deterioration. This effectively provides a stitch in time approach and ensures that
we get the best rate of return from the investment available. Red roads are roads
requiring attention currently, amber roads are roads which will require attention in
the not too distant future and green roads are roads which require no attention.
Page 92

Page 93

By progressing schemes which will provide the best rate of return, taking
consideration of the survey results and associated data, the Council is able to
deliver a programme of schemes which maximises the benefits to the travelling
public from the available investment. There is also a consideration applied that
reflects route classification and hierarchy together with the Road Condition Index. 
3.5  Surface dressing schemes are selected on the basis that, either the skid
resistance of the road surface is poor, or the road surface requires sealing before
it fails. Surface dressing can range from a standard binder with 6mm chippings
through to polymer modified binders with more than one layer of chippings. 
3.6  Following a presentation to Members in January 2023 and reports to
Environment, Development and Infrastructure Committee in June 2023, officers
carried out Members Business Days in October/November 2023 to enable an
opportunity for Members to bring forward priorities for consideration in the
2024/25 Capital Roads Programme. 
3.7  As in previous years, the roads reconstruction programme will be delivered by a
mixed economy model with the Councils in-house team delivering carriageway
reconstruction and patching works. The surface dressing element of the
programme will be delivered by an external contractor. This enables the maximum
surface area to be covered which will help to seal carriageway cracks, prevent the
ingress of water and reduce the amount of reactive maintenance for potholes. 
3.8  The table below details the total of the 2024/25 allocation following the 2023
February Budget meeting. The capital budget allocation for 2024/25 has been
split in line with the pre-agreed percentage formula which is based on road area
and population. There are a number of schemes being carried forward for various
reasons including ferry availability to transport materials. These have been shown
at the bottom of the area programmes and are in addition to the £8M funding for
2024-25. 
Area  Area Total 
OLI (35%)  £2,800,000
MAKI (31%) £2,480,000 
B&C (20%) £1,600,000 
H&L (14%) £1,120.000 
Total  £8,000,000 
3.9  In 2023/24 there was also a grant from the Strategic Timber Transport Scheme
(STTS) totaling £387k. This grant was significantly less than in previous years and
officers expect this to continue in the current frugal economic climate. This funding
was used to match fund existing schemes on the council network where timber
extraction was programmed to be carried out. It is officers’ intention to make
Page 93

Page 94

further bids to the STTS for 2024/25 which, if successful, will provide additional
investment for the road network. 
3.10  The capital programme presented is based on carriageway condition late
autumn/early winter. With the effect of winter this programme may need to be
adjusted to ensure that any investment takes into consideration any winter
deterioration. 
3.11  The programme for each of the administrative areas will be forwarded to Area
Committee Members and updates to Area Committees as the programme
progresses. The programme will also be available on the Council website with key
scheme status and dates. 
4.0  CONCLUSION 
4.1  This report provides details of the proposed roads reconstruction programme for
2024/25 and seeks comments from Elected Members on the draft programme. 
5.0  IMPLICATIONS 
5.1  Policy - works assessed and carried out under the current Roads Asset 
Management Plan. 
5.2  Financial - programme will be based on capital allocation for year 2024/25. 
5.3  Legal – None known. 
5.4  HR - reconstruction works delivered by a combination of in-house roads 
operations team and sub-contractors. 
5.5  Fairer Scotland Duty: None known. 
5.5.1  Equalities - protected characteristics – None known. 
5.5.2  Socio-economic Duty – None known. 
5.5.3  Islands – None known. 
5.6  Climate Change – due regard will be given to climate change with a view to 
minimising any climate change impact and these will be considered as and 
when they arise. 
5.7  Risk - completed works will reduce requirement to repair roads and will arrest 
the carriageway/footway deterioration. 
5.8  Customer Service - overall improvement in road surfaces and the quality of 
driven journeys.
Page 94

Page 95

5.9 The Rights of the Child (UNCRC) – the investment to improve our road network
will contribute to a safer environment for young people to thrive in. 
Executive Director with responsibility for Roads and Infrastructure: Kirsty Flanagan 
Policy Lead for Roads and Transportation: Councillor Andrew Kain 
February 2024  
For further information contact: 
Jim Smith, Head of Roads and Infrastructure Service
jim.smith@argyll-bute.gov.uk 
APPENDICES
Appendix 1 – B&C Proposed Roads Reconstruction Programme 2024/25  
Page 95

Page 96

APPENDIX 1 –  BUTE AND COWAL PROPOSED ROADS RECONSTRUCTION 
PROGRAMME 2024/25 
BUTE AND COWAL SHARE OF £8M Budget  1,600,000.00£                
2024/25 draft schemes based on the historic % split of the current £8M budget
COWAL 70%
Scheme Location, Road number/Name Works Type Estimated Cost
C7 -  from B8000 to Tank Landing - Kames Overlay £                     120,000.00
A886 Ardachuple cutting - Colintaive Overlay £                       78,815.00
A8003  Royal brae - Tighnabruaich Inlay £                       26,694.85
A886 North of Communications Mast Overlay £                       60,000.00
A886 Dunans House Northwards Overlay £                     200,000.00
B8000 Largiemore Fish farm - Peir Ho Overlay £                       99,000.00
C57 Glenbranter Overlay £                       60,000.00
B839 / B828 Passing Place improvements construction £                       56,066.15
U22 West Glendaruel Overlay £                       99,000.00
A815 Var location below  PSD Pre-SD 2024 40,000.00£                      
A815 Coylet  - Inverchapel Laying 2024 91,140.00£                      
A815 Alexandar Parade  - marine P- Pt Riddle Laying 2024 36,260.00£                      
A815 Braemar Cottage  - Kelani  Toward Laying 2024 73,024.00£                      
U27 Millhouse  /  U19 Couston Pre-SD 2025 80,000.00£                      
District Total 1,120,000.00£                
BUTE 30%
Scheme Location, Road number/Name Works Type Estimated Cost
A844   East Princess St & Battery place Inlay £                     164,228.63
U39 /U69  Gowanfield Place to St Brides Rd Inlay £                       80,000.00
U58  Serpentine Rd - to B881 Bishop St Inlay £                     135,000.00
UC5 Glecknabae -  Lenie hall - Pipers Cave Inlay £                       50,771.37
C1 Bruchag Road 2025 Pre-SD  £                       50,000.00
District Total 480,000.00£                    
2023/24 schemes re-scheduled for delivery in 2024/25
Scheme Location, Road number/Name Works Type 2023/24 allocated
budget C/F
A8003 Tighnabruaich Ph 7 Reconstruction £108,817
Page 96

Page 97

ARGYLL AND BUTE COUNCIL  BUTE & COWAL AREA COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH  
5th MARCH 2024 
HOUSING SERVICES ACTIVITY UPDATE - STRATEGIC HOUSING
INVESTMENT PLAN (SHIP) – ANNUAL UPDATE 
1.0 EXECUTIVE SUMMARY 
1.1 The main purpose of this report is to update Members of Housing Services 
activity within the Bute and Cowal area. 
This report will detail the following housing activity:-
• Declaration of a Housing Emergency 
• Argyll and Bute Housing Summit
• Housing Need and Demand
• Homelessness
• Affordable Housing Supply - Strategic Housing Investment Programme
(SHIP)
• Empty Homes
• Private Sector Housing Grant Adaptations
• Private Sector Housing Grant Repairs and Improvements
• Energy Efficiency - Energy Efficiency Scotland: Area Based
Scheme(EES:ABS)
• Local Housing Strategy 
2.0 RECOMMENDATIONS
2.1 Members are asked to consider the content of the report. 
Page 97 Agenda Item 9

Page 98

ARGYLL AND BUTE COUNCIL  BUTE & COWAL AREA COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH  
5th MARCH 2024 
HOUSING SERVICES ACTIVITY UPDATE - STRATEGIC HOUSING
INVESTMENT PLAN (SHIP) – ANNUAL UPDATE 
3.0 INTRODUCTION
3.1 The main purpose of this report is to update Members of Housing Services 
activity and the delivery of the Local Housing Strategy within the Bute and
Cowal area. 
This report will detail the following housing activity:-
• Declaration of a Housing Emergency 
• Argyll and Bute Housing Summit 
• Housing Need and Demand
• Homelessness
• Affordable Housing Supply - Strategic Housing Investment Programme 
• Empty Homes
• Private Sector Housing Grant Adaptations
• Private Sector Housing Grant Repairs and Improvements
• Energy Efficiency – Energy Efficiency Programme: Area Based Scheme
• Local Housing Strategy 
4.0 RECOMMENDATIONS
4.1 Members are asked to consider the content of this report. 
5.0 DETAIL
5.1 As the Strategic Housing Authority, the Council has a series of important statutory
housing functions to fulfil. A Housing Need and Demand Assessment (HNDA) is
carried out every 5 years which enables Scottish Government funding to be
brought into Argyll and Bute primarily to deliver affordable housing. A
comprehensive revision of the local HNDA was approved as “robust and credible”
by the Scottish Government’s Centre for Housing Market Analysis in December
2021. The Council also produces a Local Housing Strategy (LHS) every 5 years.
Full Council approved the LHS 2022-27 in December 2021. It is subject to annual
updates, which are published on the Housing Strategy pages of the Council
website.
Page 98

Page 99

The LHS has been developed in accordance with Scottish Government guidance
and local priorities as identified in the new HNDA. This sets out the vision for Argyll
and Bute: “Everyone in Argyll & Bute has access to a suitable, high quality
home which is affordable and located within a vibrant, sustainable and
connected community.” This report details the housing activity taking place in
Bute & Cowal. 
5.2 Declaration of a Housing Emergency 
In June 2023, following a report to the Environment, Development and
Infrastructure Committee, Argyll and Bute Council became the first local authority
to declare a housing emergency. A number of key statistics informed the
emergency: 
• In 2023 there were just under 3,300 people on social rented housing waiting
lists, representing an increase of 8% since the previous year. 
• The average housing price in 2022 was £206,000 which is 7 times the average
income level in Argyll and Bute.
• 11% of all homes are ineffective stock, with 6% second homes and 4% empty. 
• 42% of the property sales are made to people living out with the Argyll and
Bute area.
• There were 131 private house completions in the last 5 years representing
only 17% of the expected rate.
• Constructions costs have seen a 22% increase in 2022 with island
construction costs significantly higher. This trend is continuing currently. 
• 92% of residents responding to the Housing Emergency survey said that
housing shortage was having an impact on their community
• Of employers who responded to the workforce housing survey, 75% said a
shortage of housing was a barrier to recruiting or retaining staff 
5.3 Argyll and Bute Housing Emergency Summit 
An action within the committee report was to hold an Argyll and Bute Housing
Emergency Summit in response to the housing emergency, and this took place
on the 27th November 2023 at the SAMS campus in Oban. The purpose of the
Summit was to bring partners together to forge commitments aimed at tackling
housing shortage by maximising resources, pursuing innovation, coordinating
planning and targeting delivery capacity. 
An Action Plan is currently being developed and it is anticipated that this will be
refined and presented to members in the next few months. 
Page 99

Page 100

5.2 HOUSING NEED & DEMAND IN BUTE & COWAL 
In addition there were 78 applicants for Bute and 167 for Cowal who received
nil points according to the Common Allocation Policy and therefore would be
deemed to have no housing need. 
For Bute & Cowal as a whole, the main requirement (56%) is for one bedroom
properties, while 24% require 2 bedrooms; 12% require 3 bedrooms; and 8%
need 4 or more. 
However, to establish actual need, the available supply must be factored
into this, based on the available lets within the RSL stock during a year. 
HOMEArgyll
Applicants
RSL Lets 2021/22
(HOMEArgyll only)
Pressure
Ratio
Bute 155 105 2:1
Cowal 347 110 3:1
B & C TOTAL 502 215 2:1 
While the pressure ratios are only one factor in determining need and
demand, they are useful indicators of areas where further research and
analysis may be required. 
The fully revised Argyll & Bute HNDA 2021 takes account of a wide range of
factors to determine existing need and future demand for new build housing,
and demographic projections have a critical role in this assessment. Although
the default population projections suggest a significant and continuous decline
across Argyll and Bute, and consequently minimal or zero requirement for new
build housing,  the council has developed ambitious Housing Supply Targets
based on an alternative, positive growth scenario for all areas. In this instance,
16% of the Argyll & Bute Housing requirement would be apportioned to Cowal
and 6% to Bute; and over the next 5 years this could amount to around 340 new
builds across all tenures for the Bute & Cowal area as a whole. 
HOMEArgyll WAITING LIST November 2023 – Active
Applicants (excluding those with 0 points/no defined need)                                                             
Minimum Bedroom Size Required TOTAL
0/1beds 2beds 3beds 4+beds
Bute 104 25 18 8 155
Cowal 177 98 42 30 347
B & C TOTAL 281 123 60 38 502
Page 100

Page 101

5.3 HOMELESSNESS 
There were 188 homeless presentations across Bute and Cowal in 2022/23.
This was an increase from 92 applications in 2021/22 (104%). There was an
increase of 270% (37 up from 10) in homeless presentations on Bute during
2022/23. There was an increase of 18% in Cowal (114 up from 97). 
During 2022/23, there were 26 homeless cases closed on Bute; and 97 in
Cowal. 
The figures below illustrate the number of homeless applications and cases
closed for the period from 2018/19 to 2022/23. 
The main reasons for presenting as Homeless last year were “disputes with
family/relationship breakdown”, “other action by landlord resulting in termination
of tenancy”; and “being asked to leave”. 
0
20
40
60
80
100
120
Applications Cases closed Applications Cases closed
Bute Cowal
Homeless Applications and Cases Closed
2018/19 - 2022/23
2018/19 2019/20 2020/21 2021/22 2022/23
Page 101

Page 102

Rough Sleeping 
Bute and Cowal experienced no overall change in the incidence of rough sleeping over
the same period last year, with 4 cases (-3) in total across the area reporting that they
slept rough the night preceding their presentation but 15 (+3) reporting that they had
slept rough in the 3 months preceding their homeless application. These were
disaggregated as follows:- 
AREA Number of Rough Sleepers in 2022/23
Night Before Application 3 Months Prior to Application
Bute 1 3
Cowal 3 12
B&C Total 4 15
Argyll & Bute 26 36 
0 5 10 15 20 25 30 35 40
1. Termination of tenancy/mortgage due to rent…
10. Dispute with household/relationship breakdown:…
11. Fleeing non-domestic violence
12. Harassment
13. Overcrowding
14. Asked to leave
15. Other reason for leaving accommodation/household
2. Other action by landlord resulting in the termination…
3. Applicant terminated secure accommodation
4. Loss of service/tied accommodation
5. Discharge from prison/hospital/care/other institution
7. Forced division and sale of matrimonial home
8. Other reasons for loss of accommodation
9. Dispute with household violent or abusive
Bute and Cowal
Reasons for Homelessness 2022/23
Cowal Bute
Page 102

Page 103

5.4 AFFORDABLE HOUSING SUPPLY 
This continues to be a very challenging period for the construction sector and
there is ongoing slippage in the new build programme due to disruption and
shortages with materials and staffing. There were no Strategic Housing
Investment Plan (SHIP) developments in Cowal and Bute during the reporting
period of this report. 
However, further sites/projects in the Cowal area are being progressed or in
early stages of development and may be programmed in the SHIP in the future
include: 
ACHA Eton Avenue, Dunoon – 4 units for particular needs,
completed 2023
Dunoon phases 1-4 – 120 units in SHIP; 2026/29 
Fyne
Homes
Rothesay Academy site phases 1 and 2, Rothesay – site
acquired March 2023, 80 units in SHIP; 2027/29 
Ballochgoy, Rothesay – 8 units to be delivered in 2023/24
Tighnabruaich phase 2 – 10 units included in SHIP; 2028/29
Rothesay acquisitions – 8 units; 2024/25
Trust
Housing
Association
Redevelopment of housing complex at Strachur 
5.5 EMPTY HOMES 
In 2022/23 there were 13 private empty homes brought back into use in Bute &
CowaI, amounting to 32% of all empty homes brought back into use across
Argyll and Bute last year with assistance of Empty Homes Officer (41). 
Council Tax Information on Empty Homes 
The following table breaks down the numbers of empty homes including those
subject to premium Council Tax charge across the Bute & Cowal area.  The
table does not include properties which are empty and exempt from Council
Tax. The numbers of recorded empty homes can vary from day to day due to
natural changes and reported numbers are snapshot from November 2022
reports.   
BUTE & COWAL
Council tax data
as at 01.11.23
Number of
properties on
Council Tax
register
Empty
Homes
Properties
subject to 200%
council tax levy
Total 
EMPTY
Isle Of Bute 4,374 73 86 159
Page 103

Page 104

Cowal 8,836 110 140 250
B & C TOTAL 13,210 183 226 409 
Council Tax Exemptions
There are also a number of empty properties which are on the Council Tax
register which are exempt from paying council tax.  In Bute & Cowal there are
443 properties which are empty and exempt from Council Tax. The categories
for empty properties include: 
• Class 4A = Properties recently occupied but now empty and unfurnished
(222)
• Class 7A = Dwellings Empty Under Statute – Closing or Demolition Order
(32)
• Class 6A = Deceased owners – where estate has not been settled (138)
• Class 8A= Held for demolition (16); 
• Class 5A= Living/detained elsewhere (24); 
• Class 19A= Difficult to let separately (1);
• Class 2A= Unoccupied-renovation (7);
• Class 13A= Repossessed dwelling (3) 
Second Homes
As at 1st November 2023 there were 479 registered Second Homes on Bute
and 596 in Cowal. The number second homes for Bute and Cowal (1,075)
represents 35% of the total number of Second Homes in Argyll and Bute
(3,052). 
Self-Catering Lets
As at 3rd November 2022 there were 478 self-catering lets on the Rates register
in the Bute & Cowal area.  20% of the Argyll and Bute total (2,341). 
5.6 PRIVATE SECTOR HOUSING GRANT – ADAPTATIONS 
In 2022/23, there were 17 individual updates installed in Bute & Cowal with
PSHG aid.
Bute & Cowal 
Rates data as at 01.03.23
Number of self-catering
properties
Bute 117
Cowal  361
Bute & Cowal TOTAL 478 
PSHG ADAPTATION COMPLETIONS 2022 -2023
Page 104

Page 105

5.7 PRIVATE SECTOR HOUSING GRANT – REPAIRS AND IMPROVEMENTS
In 2022/23, there were a total of 12 PSHG repair and improvement grants
completed in Bute & Cowal, (across Argyll and Bute, the total was 57). Total
cost of the works was £135,108 of which PSHG covered £46,634. 
5.8 ENERGY EFFICIENCY (ENERGY EFFICIENT SCOTLAND: AREA BASED
SCHEME (EES:ABS))
There were 78 individual energy efficiency measures fitted across Bute & Cowal
in 2022/23 via the EES:ABS programmer. 
In total, 111 properties were improved across the area, at a total cost of
£604,589. Grant aid in support of this work amounted to £539,864. 
Current estimates of local Fuel Poverty are based on Home Analytics data
(Scottish figures sourced from The Scottish Fuel Poverty Advisory Panel):- 
Area Likelihood of Households in 
Fuel Poverty Extreme Fuel Poverty
Bute 30% 26%
Cowal 28% 21%
Argyll and Bute 30% 25%
Scotland   34% 23% 
5.9 LOCAL HOUSING STRATEGY (LHS) 2022-2027 
As the strategic housing authority for Argyll and Bute, the Council has a
statutory duty to develop, implement and monitor a Local Housing Strategy over
a five-year planning cycle, based on a robust and credible Housing Need and
Demand Assessment (HNDA) for the area.  Following completion of the
previous Argyll and Bute LHS (2016-2021) last year, a comprehensive revision
and update of the strategy has been approved by the Council and was formally
launched in April 2022. The planning process was based on a robust process
of consultation and stakeholder engagement, which has been acknowledged
as an exemplar model for other local authorities by the Scottish Government,
the CHMA, and the Scottish Housing Network LHS Forum.   
The revised HNDA was approved as “robust and credible” by the Scottish
Government’s CHMA in 2021, and this has informed the revised Housing
HMA Grant
Value
Works
Value  ADAPTATION INSTALLED      
Ramp Stair
lift Access
Hoist Bathroom
Adaptation
Wash and
Dry Unit 
External
Drainage
Collection
Bute £44,100.47 £52,612.98 1 0 1 0 4 0 0
Cowal £53,659.43 £61,316.07 0 2 1 1 6 1 0
TOTALS £97,759.90 £113,929.05 1 2 2 1 10 1 0
Page 105

Page 106

Supply Targets set out in the new LHS. These targets are based on a positive
demographic and economic growth scenario for Argyll & Bute and include
ambitious and challenging Housing Supply Targets for the Cowal and Bute
HMAs over the next 5 years and beyond. 
The Local Housing Strategy is subject to annual updates and the 2023 update
can be found in the Housing Strategy pages of the Council website
(https://www.argyll-bute.gov.uk/sites/default/files/2023LHSupdate ) 
6.0 CONCLUSION
6.1 This report provides the detail of the Council Housing Services team activity in
the Bute and Cowal area and outlines progress with the Local Housing
Strategy. There are a variety of housing issues within the area which are being
tackled by Housing Services and partner agencies with the aim of delivering a
functioning housing system which meets the needs of the communities we
serve. The scale of the challenge is shown in statistical evidence and the
declaration of the Housing Emergency and the subsequent Housing Emergency
Summit has shown that many concerns are common across agencies and
communities. 
7.0 IMPLICATIONS
7.1 Policy - Complies with approved SHIP and Local Housing Strategy.
7.2 Financial - none arising from this report.
7.3  Legal - we have a statutory duty to deliver statutory housing functions.
7.4  HR – none.
7.5  Fairer Scotland Duty: positive in terms of delivering affordable housing. 
7.5.1  Equalities - protected characteristics - none 
7.5.2  Socio-economic Duty - positive in terms of delivering affordable housing. 
7.5.3  Islands – positive in terms of delivering affordable housing on the islands.
7.6. Climate Change – the strategy and housing service deliver positive impacts for
energy efficiency and climate change.
7.7 Risk – none.
7.8  Customer Service – none.
7.9 The Rights of the Child (UNCRC) – the housing activity described in the report
will deliver affordable housing for families with children 
Kirsty Flanagan
Executive Director with the responsibility for Development and Economic
Growth 
Cllr Robin Currie 
Policy Lead for the Economy and Rural Growth 
Page 106

Page 107

January 2024 
For further information contact: 
Douglas Whyte 
Team Lead – Housing Strategy 
E-mail: douglas.whyte@argyll-bute.gov.uk 
Tel: 01546 604 785 
APPENDICES
Appendix 1 – Extract from LHS 2022 - 2027 (data as of 2021) Cowal
Appendix 2 – Extract from LHS 2022 - 2027 (data as of 2021) Bute  
Page 107

Page 108

Appendix 1 - Extract from LHS 2022 -2027 (data as of 2020) Cowal 
Cowal is projected to see a significant demographic decline if recent trends continue.
It is the mainland housing market most influenced by house purchasers from out with
Argyll and Bute – only 44% of sales in the area are to local residents. Average house
prices have actually been lower than most other HMAs in Argyll and Bute in recent
years, while household incomes are roughly average for the authority, making this one
of the relatively affordable housing market areas within the authority. Since 2015 the
total dwelling stock increased by over 5%, and currently Cowal accounts for 18% of
the authority’s housing. At the time of the last LHS, in 2015, almost 14% of the dwelling
stock was deemed ineffective to meet local needs, i.e. second/holiday homes and
long-term vacant properties. This has improved to 11%  of the total, albeit this remains
a substantial proportion of the housing stock. Over the last five years RSL homes have
increased by around 3%, bringing the total social rented stock in 2020 to 1,476 which
is 17% of the Argyll and Bute sector total. There are approximately 3 waiting list
applicants for every available let, and 20% of all homeless cases are located here;
therefore it is evident that despite some development activity and historic population
decline, a degree of unmet need remains. Parts of rural Cowal also fall within the
planning remit of the Loch Lomond & Trossachs National Park, and issues regarding
high levels of second/holiday homes, and affordability for permanent residents are
often exacerbated in these areas. 
Key issues for Cowal HMA: 
Although the rate of population decline would suggest that a surplus supply might be
generated from within existing housing stock and therefore the need for new build
would be minimal; nevertheless there are ongoing levels of unmet need in terms of
long waiting lists and relatively high homelessness, and a judicious, strategically
planned programme of new build could in fact help to support economic growth and
reverse the population decline as well as addressing specific unmet needs, such as
demand for specialist accommodation. 
Population                                     
Households                                   
Dwellings                                       
Ineffective Stock (%)  
RSL Stock  
Waiting List Applicants  
RSL Lets (2019/20) 
Pressure Ratio  
Lower Quartile House Price 
Lower Quartile Income  
LQ Affordability Ratio   
14,003
7,362
8,722
11%
1,476
400
131
3:1
£65,375
£14,617
4.5 
Cowal
Page 108

Page 109

Appendix 1 - Extract from LHS 2022 -2027 (data as of 2021) Bute 
Bute HMA is one of the least self-contained housing markets in Argyll and Bute,
with only 38% of house sales being to local residents. Almost 35% of
purchasers originate elsewhere in Scotland. Despite the lowest average
household income in Argyll & Bute, historically it has been by some way the
most affordable area in the authority with a local price to income ratio of 4.0.
Over the course of the last LHS, the number of dwellings increased very
marginally (0.4%), although total RSL stock has declined (due to a
demolition/reconfiguration programme), while the number of households
decreased by around 1%. Over 19% of the general housing stock is unavailable
to meet local need i.e. second/holiday homes or long-term vacant. While
evidence remains of potential over-supply in the RSL sector - with relatively
high annual turnover, areas of low demand, and the main landlords sustaining
a number of voids– nevertheless there are indications of increased market
activity and growing pressures. 
Key issues for Bute HMA: 
The main focus for Bute remains maintaining, repairing, improving and
managing the existing stock, across all tenures.
However, emerging perceptions on the island suggest that need for
additional, affordable housing may be growing as greater pressures are
becoming evident with increased market activity and more properties
potentially being lost from the effective, permanent housing stock. 
Tackling fuel poverty, improving energy efficiency and targeting Housing
Options advice and assistance remain priorities; as does supporting those
with particular needs to remain independent in their home or within the
community as far as possible. 
Population                                     
Households                                   
Dwellings                                       
Ineffective Stock (%)  
RSL Stock  
Waiting List Applicants  
RSL Lets (2019/20) 
Pressure Ratio  
Lower Quartile House Price 
Lower Quartile Income  
LQ Affordability Ratio   
5,981
3,372
4,247
19%
1,054
148
172
0
£45,000
£11,093
4.0 
Bute
Page 109

Page 110

This page is intentionally left blank

Page 111

ARGYLL AND BUTE COUNCIL  Bute and Cowal Area Committee 
DEVELOPMENT AND ECONOMIC
GROWTH 
05 March 2024 
2023/24 Active Travel Progress Report 
1.0 EXECUTIVE SUMMARY 
1.1. This report provides an update to Members on the progress made in 2023/24 in
relation to active travel projects in the Bute and Cowal (B&C) Area, informs
Members of the significant changes in Scottish Government active travel funding
and seeks continued support for the projects and wider active travel measures
from Members. 
1.2. Active travel encompasses accessible, everyday Walking, Mobility Assistance
and child prams (sometime collectively termed “Wheeling”) and Cycling.  The
focus of active travel is on accessible provision including those with mobility
impairments. 
1.3. The Council’s Active Travel Team, 1.7 Full Time Equivalent employees, is part of
the Strategic Transport Team within the Development and Economic Growth
Service.  No Council funding is currently received by the Active Travel Team. All
project costs, including internal staff costs, have to be funded via successfully
securing highly competitive external challenge funds. 
1.4. The Active Travel Team work with communities, internal and external
stakeholders across Argyll and Bute to develop and deliver active travel projects
which provide new/improved accessible infrastructure (e.g. paths, cycle lanes)
and behaviour change (e.g. access to bikes, walking/cycle training, promotional
activities). 
1.5. In 2023/24 to date, the Active Travel Team secured £2.56M external funding for
the development and delivery of a total of 23 projects across Argyll and Bute. 
These include 4 Argyll and Bute wide projects, valued at £155,000 in 23/24 and
projects specific to the B&C area, with a 23/24 value of £667,000. 
1.6. The Active Travel Team work to source and secure highly competitive funding
from a range of sources, the main of which are Transport Scotland’s Places for
Everyone (PFE) Programme (administered by Sustrans), the Scottish
Government’s Cycling, Walking and Safer Routes (CWSR) fund and Delivery
Resource Fund, Paths for All Smarter Choices Smarter Places (SCSP)
programme, Transport Scotland’s Active Travel Transformation Fund (ATTF),
Page 111 Agenda Item 10

Page 112

and HITRANS Regional Active Travel Fund.  Further funding has been secured
for some projects via local community organisations and from willing
businesses.  It is recognised at a national level that the Active Travel Team in
Argyll and Bute Council secure significantly more funding, and subsequently
deliver more projects, than similar staffed teams in other Local Authorities and/or
local authorities with similar populations. 
1.7. Transport Scotland have informed Officers that, as of 24/25, the funding model
for active travel will change.  The primary change will be the reallocation of the
significant funding currently disbursed via third-sector organisations (such as
Sustrans or Paths for All) and, to a lesser extent Transport Scotland (e.g.
CWSR), to individual Local Authority block grants and a single Transport
Scotland controlled Active Travel Infrastructure Fund (ATIF).  This will be
undertaken incrementally over a 2 year transition period. 
1.8. Transport Scotland informed Officers on 23 January 2024 that, as of 24/25, the
funding model for active travel will change.  Transitional arrangements for
infrastructure design and construction are understood by Officers to be:
• 24/25 a proportion of the Scottish Government’s active travel funding will be
allocated to Local Authority block grants with the remainder remaining as
challenge funding, in particular in the PFE Programme (administered by
Sustrans) and Transport Scotland’s ATIF fund.  Transport Scotland have
stated that failure to expend the block grant allocation on appropriate active
travel projects will negatively affect the Council’s opportunity to secure
additional funding from the ATIF.  The Scottish Government’s budget
commits a total of £220M to active travel in 24/25.
• 25/26, those Local Authorities which chose (in 24/25) to expend the full
amount of active travel funding in their block grant on appropriate active
travel projects will receive an increase in their block grant allowance for
active travel, with a smaller percentage of the overall funding being available
via challenge funds following the closure of the PFE programme (forecast for
December 2025). The Scottish Government has set an objective of
committing 10% of the 25/26 transport budget to active travel, estimated to
be c.£320M.
• 26/27 onwards the challenge funding available will be solely focused on
assisting Local Authorities with the cost of delivering very highly ambitious
active travel projects, as active travel infrastructure funding for smaller
projects will be included within block grants of those Local Authorities which
have chosen in 24/25 and 25/26 to dedicate it to active travel. 
1.9. Transitional arrangement for behaviour change is understood by Officers to be
the transfer of the majority of the Scottish Government’s behaviour change
funding in 24/25 onwards from third sector organisations to the Regional
Transport Partnerships (RTPs).  This will enable the development and delivery
of behaviour change programmes/activities which are tailored to the specific
requirements of each RTP area.  A small element of the Scottish Government’s
Page 112

Page 113

behaviour change funding will be retained to continue campaigns/cycle training
programmes which are deemed to be most effective when delivered at a
national scale. 
1.10. Separately, Officers are working to develop an Active Travel Strategy (ATS) for
Argyll and Bute which will set out the policy and strategic context for the
development and delivery of active travel across the whole of Argyll and Bute. 
Subsequent to this, an Active Travel Delivery Plan (ATDP) will be developed
which will identify the specific projects to be developed in order to achieve the
ambition set in the ATS. 
1.11. Active Travel can offer significant benefits to the area:
• Access to essential services and employment: In B&C 30% of households
(3,204 households) do not have access to a motor vehicle and are therefore
reliant on public transport and active travel modes.
• Health benefits: being more active reduces the risk of premature morbidity
and death, particularly from diseases related to inactivity.
• Economics: People who travel to shops by walking and/or cycling have a
higher monthly spend than people who travel to shops by private car.
• Improving safety: reduces injuries from car collisions. 
1.12. A number of active travel projects link to schools, offering the opportunity to
increase the numbers of pupils, parents and staff choosing to walk, cycle or
wheel to school.  While the main benefits are improved physical and mental
health, where new active travel infrastructure creates a safe route to school
where one did not previously exist it could reduce the requirement to provide
school transport on safety grounds, thereby creating a revenue saving to the
school transport budget. 
RECOMMENDATIONS 
1.13. It is recommended that the Bute and Cowal members: 
1.13.1. Welcome the progress made to date across a significant number of
active travel projects by the small Active Travel Team. 
1.13.2. Support the continuation of the projects and the submission of future
funding applications to external challenge funds (while these still exist)
to continue to develop design and construction stages in order to
deliver these projects. 
1.13.3. Support the allocation of the active travel funding element in the
Council’s 24/25 block grant to the development and delivery of
appropriate active travel projects, including those already underway in
B&C. 
Page 113

Page 114

1.13.4. Instruct Officers to continue to identify and develop new active travel
projects to benefit local residents, businesses and communities. 
Page 114

Page 115

ARGYLL AND BUTE COUNCIL  Bute and Cowal
DEVELOPMENT AND ECONOMIC
GROWTH 
28 February 2024 
2023/24 Active Travel Progress Report 
2.0 INTRODUCTION 
2.1. This report provides an update to Members on the progress made in 2023/24 in
relation to active travel projects in the Bute and Cowal (B&C) Area and seeks
continued support for the projects from Members. 
2.2. Active travel encompasses accessible, everyday Walking, Mobility Assistance
and child prams (sometime collectively termed “Wheeling”) and Cycling.  The
focus of active travel is on accessible provision including those with mobility
impairments. 
3.0 RECOMMENDATIONS 
3.1. It is recommended that the Bute and Cowal members: 
3.1.1. Welcome the progress made to date across a significant number of
active travel projects by the small Active Travel Team. 
3.1.2. Support the continuation of the projects and the submission of future
funding applications to external challenge funds (while these still exist)
to continue to develop design and construction stages in order to
deliver these projects. 
3.1.3. Support the allocation of the active travel funding element in the
Council’s 24/25 block grant to the development and delivery of
appropriate active travel projects, including those already underway in
B&C. 
3.1.4. Instruct Officers to continue to identify and develop new active travel
projects to benefit local residents, businesses and communities. 
4.0 DETAIL 
4.1. The Council’s Active Travel Team, 1.7 FTE (Full Time Equivalent employees), is
part of the Strategic Transport Team within the Development and Economic
Growth Service.  No Council funding is currently received by the Active Travel
Page 115

Page 116

Team. All project costs, including internal staff costs, have to be funded via
successfully securing highly competitive external challenge funds. 
4.2. It is recognised at a national level that the Active Travel Team in Argyll and Bute
Council secure significantly more funding, and subsequently deliver more
projects, than similar staffed teams in other Local Authorities and/or local
authorities with similar populations. 
4.3. The Active Travel Team work with communities, internal and external
stakeholders across Argyll and Bute to develop and deliver active travel projects
which provide new/improved accessible infrastructure (e.g. paths, cycle lanes)
and behaviour change (e.g. access to bikes, walking/cycle training, promotional
activities). 
4.4. In 2023/24 to date, the Active Travel Team secured £2.56M external funding for
the development and delivery of a total of 23 projects across Argyll and Bute,
including Argyll and Bute wide projects, valued at £155,000 in 23/24 and projects
specific to the B&C area, with a 23/24 value of £667,000.  Further details of these
projects is presented in Appendix 1. 
Future Funding Model 
4.5. Transport Scotland informed Officers on 23 January 2024 that, as of 24/25, the
funding model for active travel will change.  At the time of writing, Transport
Scotland have stated that they are unable to confirm the value of specific
funding streams for 24/25 as these are still subject to agreement with COSLA.  It
is understood the primary change will be the reallocation of the significant
funding currently disbursed via third-sector organisations (such as Sustrans or
Paths for All) and, to a lesser extent Transport Scotland (e.g. CWSR) to
individual Local Authority block grants and a single Transport Scotland
challenge fund, the Active Travel Infrastructure Fund (ATIF).  This will be
undertaken incrementally over a 2 year transition period. 
4.6. Provisional transitional arrangements for infrastructure design and construction
are understood by Officers to be:
• 24/25 the allocation of a proportion of the Scottish Government’s active travel
funding to Local Authority block grants with the remainder remaining as
challenge funding, in particular in the PFE Programme (administered by
Sustrans) and Transport Scotland’s ATIF.  The split of allocation the funding
is understood to still be in negation between Transport Scotland and COSLA
with Transport Scotland expecting to confirm values in early 24/25. 
Transport Scotland have also stated that failure to expend the block grant
allocation on appropriate active travel work will negatively affect the Council’s
opportunity to secure additional funding from the ATIF.
• 25/26, those Local Authorities which chose (in 24/25) to expend the full
amount of active travel funding in their block grant on appropriate active
Page 116

Page 117

travel projects will receive an increase in their block grant allowance for
active travel, with a smaller percentage of the overall funding being available
via challenge funds including the closure of the PFE programme (forecast for
December 2025).
• From 26/27 onwards the challenge funding available (e.g. ATIF) will be
solely focused on assisting Local Authorities with the cost of delivering very
highly ambitious active travel projects, as the active travel infrastructure
funding for smaller projects will be included within the block grants of those
Local Authorities which chose to dedicate it to active travel in 24/25 and
25/26. 
4.7. Behaviour change funding will be transferred from third sector organisations to
the Regional Transport Partnerships (RTPs) in 24/25 onwards.  This will enable
the development and delivery of behaviour change programmes/activities which
are tailored to the specific requirements of each RTP area.  A small element of
the Scottish Government’s behaviour change funding will be retained to continue
campaigns/programmes which are deemed to be most effective when delivered
at a national scale.  Officers have started to engage with our RTPs (HITRANS
and SPT) in order to understand and influence the future plans for the delivery of
behaviour change projects. 
Current (2023/24) Funding Model 
4.8. The Active Travel Team work to source and secure highly competitive funding
from a range of sources, the main of which are Transport Scotland’s Places for
Everyone (PFE) Programme (administered by Sustrans), the Scottish
Government’s Cycling, Walking and Safer Routes (CWSR) fund and Delivery
Resource Fund, Paths for All Smarter Choices Smarter Places (SCSP)
programme, Transport Scotland’s Active Travel Transformation Fund (ATTF),
and HITRANS Regional Active Travel Fund.  Further funding has been secured
for some projects via local community organisations and from willing
businesses.  It is recognised at a national level that the Active Travel Team in
Argyll and Bute Council secure significantly more funding, and subsequently
delivery more projects, than similar staffed teams in other Local Authorities
and/or local authorities with similar populations. 
4.9. The primary external funding route for active travel infrastructure design is
Transport Scotland’s Places for Everyone (PFE) programme (which Sustrans
are paid to administer).  The PFE Programme is a competitive challenge fund
structured around 8 project stages; with the 32 local authorities, 7 regional
transport partnerships, two national parks and numerous community groups
across Scotland competing against each other to secure the funding each
project requires.  In 23/24, the Active Travel Team secured £1.7M from the PFE
Programme.  It has been announced that the PFE Programme will by wound
down with a final closure date of December 2025. 
Page 117

Page 118

4.10. A minimum of three new competitive funding submissions are required to
complete a project using PFE funding, with competitive applications required, as
a minimum, prior to Stage 0 (Strategic Definition), Stage 3 (Developed Design)
and Stage 5 (Construction).  The full project stages are (0) Strategic Definition,
(1) Preparation and Brief, (2) Concept Design), (3) Developed Design, (4)
Technical Design, (5) Construction, (6) Handover & Close Out and (7) In Use. 
4.11. The Scottish Government Cycling, Walking and Safer Routes (CWSR) fund is
an annual ring-fenced fund which provides the opportunity for Local Authorities
to identify and deliver lower value active travel infrastructure without the level of
complexity and time required by the PFE route.  In 23/24, the Active Travel
Team secured £551,000 from the CWSR fund.  It is understood by Officers that
the CWSR fund will terminate in March 2024. 
4.12. The Smarter Choices Smarter Places (SCSP) programme is run by Paths for All
and provides funding for behaviour change projects.  Behaviour change projects
are designed to influence behaviour and choice, rather than provide new
infrastructure.  In 23/24, the Active Travel Team secured £80,000 from the
SCSP programme.  It has been announced that the SCSP programme will
terminate in March 2024.   
4.13. Transport Scotland’s Active Travel Transformation Fund (ATTF) was launched
in 23/24 and focuses on supporting Local Authorities, RTPs and National Parks
with the additional cost of constructing very ambitious, high-quality active travel
projects.  Projects must be fully construction ready prior to submission to the
ATTF.  Officers submitted two applications to the 23/24 ATTF, but, while these
were shortlisted on the reserve list, were unsuccessful in securing funding in
23/24.  The application deadline for 24/25 projects to ATTF is late January 2024
and, at the time of writing, Officers are developing competitive submissions. 
4.14. HITRANS Regional Active Travel Fund has previously supported a number of
projects in B&C.  HITRANS have a relatively small capital budget compared to
the geographical area covered and require to support five local authorities. 
Benefits of Active Travel 
4.15. 30% of households (3,204 households) in the B&C area do not have access to
any motor vehicles (2011 census) and are therefore reliant on public transport
and active travel methods to move around. 
4.16. Transport poverty is defined as households and individuals who spend a
significant percentage of their income to make the journeys they need (UK
Government, 2019).  In B&C, where a higher than Scottish average of the
population have low incomes (SIMD, 2020), the cost of travel is a significant
barrier to a substantial number of the community.  This is highlighted by the
higher than Scottish average number of households have multiple cars but
Page 118

Page 119

shorter than Scottish average journey distances to work/study (2011 census),
indicating that a significant number of households own multiple cars to travel
short distances.  Walking, wheeling (mobility aids/child prams) and cycling are
much cheaper than running a car or using public transport, and improving
opportunities to choose to walk/cycle for essential journeys can improve access
to essential services, reduce social exclusion and increase opportunities to
access education and employment. 
4.17. Health benefits of enabling individuals and communities to choose to travel more
actively are well documented and a significant body of research has identified
that having active, healthy lifestyles helps to reduce fragility and reduce falls as
individuals age, and increase social inclusion and accessibility.  In particular,
being more active reduces the risk of premature morbidity and death,
particularly from diseases related to inactivity including cardiovascular
disease, coronary heart disease, stroke, dementia, type 2 diabetes, hip
fractures and cancer.  Active travel also has significant mental health benefits
including increasing social inclusion and reducing depression. This means
those who choose to be more active are less likely to require social care
services in later life which could result in a future saving to the Council or
HSCP (DfT, 2014; CIHT, 2016; Centre for Mental Health, 2016; Scottish
Government, 2018; Dunoon Shaping Places for Wellbeing, 2022; World Health
Organisation, 2022; Public Health Scotland, 2022; Public Health Scotland,
2023). 
4.18. Economics: People who travel to shops actively by walking and/or cycling, while
they spend less per individual visit, make more visits a month and have a higher
monthly spend than people who travel to shops by private car (Pedestrian
Pound, 2018).  Improving public realm and routes to shops for pedestrians and
cyclists can increase trade by up to 40% (Pedestrian Pound, 2018).   
4.19. Improving safety through good design, in particular to protect more vulnerable
individuals, pedestrians and cyclists, reduces injuries from car collisions (Public
Health Scotland, 2022).  Where people choose to travel actively to make a
journey instead of using a private car, this reduces the number of car
movements which makes streets cleaner, improves air quality, reduces traffic
congestion and reduces demand for space to park in key hotspots. 
4.20. A number of the active travel projects link to schools, thereby offering the
opportunity to increase the numbers of pupils, parents and staff choosing to
walk, cycle or wheel to school.  While the main benefits are improved physical
and mental health, such provision may also generate a saving on school
transport provision.  Argyll and Bute Council provide free school transport to
some pupils on safety grounds.  This is where pupils live less than the legislative
minimum distance from school to qualify for free school transport provision, but
where there is no safe active travel route to school.  Where new active travel
infrastructure creates a safe route to school where one did not previously exist it
Page 119

Page 120

could reduce the requirement to provide school transport on safety grounds,
thereby creating a revenue saving. 
Design guidance 
4.21. It is understood that adherence to the latest design criteria for active travel (e.g.
Cycle by Design for cycle projects) will continue to be a requirement.  However,
the removal of national third-sector organisations from control of the main active
travel funding steams should enable Officers to apply the guidance in a more
flexible and specific manner to local circumstances.  Utilising adopted design
guidance provides a clear framework for development of designs which are
appropriate, accessible, attractive and safe. 
Active Travel Strategy (ATS) 
4.22. Separately, Officers are working to develop an Active Travel Strategy (ATS) for
Argyll and Bute which will set out the policy and strategic context for the
development and delivery of active travel across the whole of Argyll and Bute. 
Subsequent to this, an Active Travel Delivery Plan (ATDP) will be developed
which will identify the specific projects to be developed in order to achieve the
ambition set in the ATS. 
5.0 CONCLUSION 
5.1. Significant changes to the funding model in 2024/25 and 2025/26 will create
opportunities for active travel projects to focus on local priorities, rather than
projects which meet the aspirations and objectives of national organisations. 
However, continued delivery of new and improved active travel opportunities to
the residents, businesses, communities and visitors in the B&C area will require
Members to commit the additional active travel funding allocation in the 24/25
Council Block Grant to the development and delivery of active travel projects. 
6.0 IMPLICATIONS 
6.1. Policy Completion of this project will support the Council’s
SOA outcomes 2: We have infrastructure that supports
sustainable growth and 5: People live active, healthier
and independent lives. The project also supports
achievement of the Scottish Government’s objectives
set out in the Cycling Action Plan for Scotland (CAPS)
and Let’s Get Scotland Walking - The National
Walking Strategy. 
6.2. Financial The change in approach to the provision of active
travel funding by the Scottish Government from
external challenge funding to including it within the
Page 120

Page 121

Council’s block grant will require Members to decide to
allocate the funding to develop and deliver active
travel projects.
Improved active travel provision could reduce the
requirement to provide school transport on safety
grounds, thereby creating a revenue saving.
There is strong evidence that people who are more
active, for example by walking or cycling, have better
physical and mental health and are less likely to
require social care services in later life which could
result in a future saving to the Council or HSCP. 
6.3. Legal Continued input will be required from Legal Services to
support any land acquisition required for the creation
of active travel routes. 
6.4. HR None.
6.5. Fairer Scotland
Duty: 
6.5.1 Equalities Provision of new and improved active travel
infrastructure and behaviour change options will
provide enhanced opportunities for residents and
visitors to choose to travel more sustainably and
actively by walking, wheeling and cycling.
All new active travel routes are designed to be
accessible and DDA compliant to provide a safe and
accessible route for those with mobility aids including
wheelchairs and parents/guardians with a child’s pram
or buggy.
6.5.2 Socio-
economic Duty
New and improved active travel routes will improve
access to essential services, retail, leisure and
employment opportunities for local residents, with
studies demonstrating those who travelled actively had
a higher monthly spend in local businesses than those
who travel via motorised transport.
The routes will also offer opportunities for individuals
to travel for leisure, again encouraging spend in local
businesses connected by the routes.
6.5.3 Islands A number of the active travel projects are based on
islands, thereby providing the same opportunities for
island residents/visitors to choose to travel actively as
those on the mainland.  Where visitors choose to
travel actively in leu of taking a motor vehicle this can
help reduce demand for the overstretched vehicle
capacity on the ferry services.
Page 121

Page 122

6.6. Climate Change  Active Travel is the least carbon intensive mode of
travel.  Providing the opportunity for residents and
visitors to consider an alternative to having to use a
private car to travel will help lower Argyll and Bute’s
carbon footprint. 
6.7. Risk There is a reputational risk to the Council if the
projects are not completed within a reasonable
timeframe. 
6.8. Customer
Services  
None. 
6.9. The Rights of the
Child 
Active travel is the most accessible mode of travel to
young people, as it does not have any minimum age
limits, does not require any form of licence, is free to
use and is not tied to any fixed timetable.
All new active travel infrastructure is designed to be
utilised by an unaccompanied 12 year old.
Engagement with school pupils indicates that the vast
majority of pupils strongly support the provision of new
active travel infrastructure, even where it would
adversely impact other modes of transport.   
Executive Director with the responsibility for Development and Economic
Growth: Kirsty Flanagan 
Policy Lead: Cllr Andrew Kain 
24 January 2024 
For further information contact:  Colin Young    
Strategic Transportation Delivery Officer    
colin.young@argyll-bute.gov.uk    
01546 604275 
Appendix 1: 2024/25 Active Travel Projects
Page 122

Page 123

Appendix 1: 2024/25 Projects 
Project Outline Programme Detail
Active Travel Promotional
Campaign 
Spring 2024: launch and 1st
campaign 
24/25: continue campaign 
Future: 
Creation of a new sustainable travel (walking, wheeling, cycling
and public transport) promotional brand “Better Journeys” and
develop a promotional campaign to raise awareness of
opportunities to travel actively and sustainably across Argyll and
Bute.  External funding has been retained within the Council by
working with the Council’s Communications Team to develop
the brand, campaign materials including posters and social
media clips and prepare to launch the campaign in spring 2024.
Beat the Street Game 14 Feb – 27 Mar 2024 Beat the Street is a 6-week game run by Intelligent Health and
funded by Paths for All Smarter Choices Smarter Places,
supported by Transport Scotland.  The Argyll and Bute Beat the
Streets game is being run jointly with North Ayrshire Council
between 14 Feb and 27 Mar 2024, and within Argyll and Bute
includes the settlements of Helensburgh, Cardross, Rhu and
Kilcreggan; Dunoon, Toward, Strone and Sandbank; Rothesay
and Port Bannatyne; Campbeltown, Carradale, Drumlemble and
Southend. 
Beat the Street is a free, fun, walking, cycling and wheeling
game which gets communities, school pupils, and their families
out and about in the local area, having fun and keeping healthy.
It’s designed to get children and communities moving by helping
people to make small changes, such as walking or cycling to
school every day, to improve physical and mental health and
help embed physical activity into everyday life.  Free game
packs have been delivered to primary schools within the areas
above, including a contactless game card for each
Page 123

Page 124

pupil.  Additional game cards can be collected by members of
the public from public distribution locations such as libraries in
the game areas.  Players use contactless game cards to hover
over the Beat Boxes which have been installed on lamp posts in
the game areas and score points as they travel around.  There
is also a smartphone app which players over 13 years old can
download.  For further information please see:
https://www.beatthestreet.me/activenation/
Smart phone app promotion Summer 2023: 1st campaign 
Summer 2024: 2nd campaign 
Future: potential to repeat
campaign annually
Promotional campaign to raise awareness and use of the five
existing active travel smartphone apps (Campbeltown, Dunoon,
Helensburgh, Oban and Rothesay).  The first year of the
campaign in summer 2023 increased downloads of the free to
access apps by 74%.
Pedestrian and Cycle Counters Ongoing: dependent on
securing annual funding
Argyll and Bute Council operate a network of automated
pedestrian and cycle counters with 36 installed across the Council
area. The data from these counters is used to monitor changes in
pedestrian/cycle numbers, including from new routes, and by
partners to support compilation of national statistics. The data is
also publicly available via a dedicated website.
Dunoon Active Travel Bothy Ongoing: dependent on
securing annual funding
Working in partnership with Cycling UK, the successful Dunoon
Bothy project supports local residents in Dunoon and Cowal to
choose to walk or cycle.  The Bothy staff and volunteers offer a
range of activities including family activities, led walks, led rides,
cycle training and cycle loan to encourage and enable residents to
view active travel as a viable option for short everyday journeys.
Dunoon Behaviour Change
Plan
2023/24: plan drafted 
2024/25 – onwards: plan
implemented
Working in partnership with Dunoon Community Development
Trust and the Shaping Places for Wellbeing project to develop a
town wide behaviour change plan to support individuals and
groups to find opportunities to become more active with the
Page 124

Page 125

objectives of increasing inclusion/reducing social isolation,
increasing access to services, improving health and reducing
transport poverty.
Dunoon to Hunters Quay
Active Travel Route
2018/19: Concept Design v1 
2023/24: Concept Design v2 
2024/25: Developed and
Technical Design 
2026/27 – 2029/30:
Construction
This project seeks to improve the strategically important corridor
between Dunoon and Hunters Quay that connects the ferry
terminal at Hunters Quay with Dunoon Town Centre and the
Dunoon Ferry Terminal for pedestrians and cyclists. The project
also seeks to introduce a series of improved crossing facilities at
key locations along its length in order to create safer accessible
links over the A815 thereby improving the connection for
everyone including those with limited mobility between the route
which runs along the seaward side of the A815 and facilities and
residential areas that are located on the landward side of the
A815.  The project also seeks to introduce public realm
improvements at key locations such as the Kirn Shops to help
emphasize Kirn as a destination and create an improved sense
of place.
Rothesay Town Centre to Joint
Campus
2018/19: Concept Design 
2020/21 - 2021/22: Developed
Design 
2024/25: Technical Design 
2026/27 – 2029/30:
Construction
This project has developed a preferred option for a safe route
between Rothesay Town centre and the Joint Campus along the
B881 High Street, and in 24/25 it is planned to develop the
preferred option to a fully constructible set of designs. This will
deliver on the community ambition to create a safe route
between the town centre and the Joint Campus, and it will
create an important active travel route that will link in with the
health centre, hospital, leisure centre, town centre, ferry terminal
and other key services/destinations.
Rothesay Pavilion to Albert
Pier
2023/24: Concept Design 
2024/25: Developed Design 
2025/26: Technical Design
This project will undertake extensive community engagement to
develop options and designs to improve the walking, wheeling
and cycling environment along the A844 Victoria Street, including
the provision of links into the neighbouring communities and
destinations along the route, from the Rothesay Pavilion to the
Page 125

Page 126

2026/27 – 2027/28:
Construction
Rothesay Ferry Terminal and on to Albert Pier.  This route is a
key commuter and community link that will provide a safe active
travel route to places of employment, essential services,
residential areas, transport hubs, key recreational facilities and a
range of retail services. The designs will include appropriate
place making elements to enhance the route and offer wider
public benefits along the route corridor.
The designs will also improve pedestrian links into Rothesay
Town Centre, Discovery Centre and the Rothesay Pavilion, and
make allowance for potential future active travel connections,
including onward on the A844 and the planned active travel
improvements between Rothesay Ferry Terminal and the Joint
Campus.
Dunoon Castle Gardens Path
Upgrade
As per Economic Development
plan
Financial support to Economic Development colleagues to
support upgrading paths within Dunoon Castle Gardens as part
of the wider Castle Gate Lodge project to improve links to the
newly refurbished Gate Lodge and improve walking, wheeling
and cycling links through the Castle Gardens to improve active
travel links between Dunoon Ferry Terminal, Town Centre and
Promenade and the large residential areas behind the Castle
Gardens. 
Page 126

Page 127

ARGYLL AND BUTE COUNCIL       BUTE AND COWAL AREA COMMITTEE 
DEVELOPMENT AND ECONOMIC GROWTH                      5 MARCH 2024 
ROTHESAY TOWNSCAPE HERITAGE SCHEME – MARCH 2024 FINAL UPDATE 
1. EXECUTIVE SUMMARY 
1.1. The purpose of this report is to update members on the progress of the
Rothesay Townscape Heritage (TH) scheme as the programme nears
completion. 
1.2. The 5 year programme, which started in September 2017, was due to
complete in September 2022.  As a result of the COVID-19 pandemic and the
subsequent impact on the construction industry, completion was delayed until
31st December 2023. Further contractor and weather related delays now
mean the programme will have a final completion date of 31st March 2024 to
allow for these final transformational projects to be completed as planned. 
1.3. The programme has made a transformational difference to the town centre of
Rothesay including: 
• 4 priority buildings restored with a 5th due to complete by end of
March 2024. This includes the new Argyll and Bute Council Customer
Service hub at 37 Victoria Street.
• 4 shopfronts restored with a 5th due to complete by end March 2024.
• 9 traditional window projects completed.
• 14 training and community engagement events held involving School
Pupils and Homeowners. 
• 1 Community pop-up shop and innovation space created. 
RECOMMENDATIONS 
That members of the Bute and Cowal Area Committee note and consider the
content of the report. 
Page 127 Agenda Item 11

Page 128

ARGYLL AND BUTE COUNCIL       BUTE AND COWAL AREA COMMITTEE 
DEVELOPMENT AND ECONOMIC GROWTH                      5 MARCH 2024 
ROTHESAY TOWNSCAPE HERITAGE SCHEME – MARCH 2024 FINAL UPDATE 
2. INTRODUCTION 
2.1. The purpose of this report is to update members on the progress of the
Rothesay Townscape Heritage (TH) scheme as the programme nears. 
2.2. The 5 year programme which started in September 2017 was due to complete
in September 2022. As a result of the COVID-19 pandemic and the
subsequent impact on the construction industry, completion was extended
until 31st December 2023 to allow for all of the regeneration projects to
complete as planned. Further contractor and weather related delays now
mean the programme will have a final completion date of 31st March 2024 to
allow for all of these transformational projects to be completed as planned. 
2.3. The Rothesay Townscape Heritage (TH2) Project is a £2.8m jointly funded
grant programme focusing on the regeneration of historic buildings as well as
traditional skills, training and community engagement. 
2.4. Rothesay TH is part funded by the Scottish Government, The European
Community Argyll and the Islands LEADER Programme 2014-2020, Historic
Environment Scotland, National Lottery Heritage Fund, Highlands and Islands
Enterprise, Smarter Choices Smarter Places, and Argyll and Bute Council. 
2.5. The programme has made a transformational difference to the town centre of
Rothesay including: 
• 4 priority buildings restored with a 5th due to complete by end of
March 2024. This includes the new Argyll and Bute Council Customer
Service hub at 37 Victoria Street
• 4 shopfronts restored with a 5th due to complete by end of March
2024.
• 9 traditional window projects completed.
• 14 training and community engagement events held involving School
Pupils and Homeowners. 
• 1 Community pop-up shop and innovation space created. 
Page 128

Page 129

3. RECOMMENDATIONS 
3.1. It is recommended that members of the Bute and Cowal Area Committee note
and consider the content of the report. 
4. DETAIL 
4.1. Rothesay Townscape Heritage (TH) Scheme is primarily a heritage and
regeneration focused grants administration scheme that involves substantial
amounts of dialogue and commitment with property owners, both residential
and business, and the wider community to see the economic regeneration
realised. A large component of the programme is also dedicated to raising
awareness of the historic built environment and celebrating the heritage and
culture of the Isle of Bute. 
4.2. The scheme has been transformational for the town centre and has delivered
visual improvements benefitting those who live, work and visit this historic
town. 
4.3. Priority Building Repairs
Full scale repairs have now been carried out to the following properties: 
• Isle of Bute Discovery Centre (The Winter Gardens)
• 73-77 Victoria Street
• 39-43 Victoria Street
• 1 Tower Street & 37 Victoria Street (New Customer Service Hub)
• 69-72 Victoria Street (due to complete by end of February 2024)
The regeneration works that have taken place at 1 Tower Street/37 Victoria
Street include the new customer service hub. Argyll and Bute Council had
purchased 37 Victoria Street (former Royal Bank of Scotland Branch) and this
allowed for registration staff to be relocated from Eaglesham House to this
ideal town centre location. The public response to announcements on social
media has been very positive and a welcome move in terms of accessibility. 
4.4. Shopfront Restoration
The following shops have benefitted from full-scale restoration: 
• The Electric Bakery
• Glens Clothing, Victoria Street
• Bussey’s, Victoria Street (currently occupied by “For Bute”)
• DC Murray, Argyle Street
• 70 Victoria Street (Empty Premises to become “Gallacher Furniture”) 
Page 129

Page 130

4.5. Training and Community Engagement
The following projects have been delivered with a view to raising awareness
of the historic built environment, to celebrate the heritage and culture of Bute,
and to help strengthen resilience within the island’s creative, innovative and
tourism industries:
• Built Heritage Information Sessions – 244 school pupils learnt
about common building problems and the importance of maintenance
through a range of educational tools and workshops. A range of
practical workshops were also held for homeowners, including the
repair and maintenance of timber windows, and working with lime
render. 
• Environmental Arts Project – An audio tour of Rothesay, entitled, “If
these stones could talk” encouraged an audience of 22 to discover the
hidden delights of Rothesay and what makes it a great place to live,
work and visit. 
• Audience Development – The work sought to engage with the local
community to understand how best to market Bute to visitors. Targeted
segments including: heritage, wildlife and active tourism were
recommended as a result of the exercise, and which form the basis of
a toolkit that is available to businesses island-wide, and which has
been shared with Visit Bute as a resource that can be further
developed by the organisation. This report has also been shared with
Bute BID who have expressed it contains very useful information and
research in relation to delivering their primary aim of establishing the
Island as a thriving, vibrant place where visitors will want to visit and
where new businesses will want to invest. 
• Digital Strategy – Further analysis explored the digital journey that
visitors make from first considerations to actually stepping foot on the
island, and which resulted in recommendations around the need for a
Bute brand, specific digital platforms, and a central organised
marketing effort. This report has been shared with Bute BID who are
looking in to improving the digital presence of Bute Businesses. 
• Artist’s Workshop Analysis – A project was undertaken to analyse
demand for town centre artists’ workshop and studio space using the
WASPS model, which houses workshops in restored historic derelict
buildings. The study recognised Bute’s vibrant artistic community, and
suggested there is interest for a shared workshop/studio space,
though also illustrated the difficulties in achieving this due to the variety
of art practices, all of which require quite different and specific needs.  
• Wayfinding – Areas of the town centre were reviewed with
sustainable transport in mind. As part of the TH boundary, options for
Page 130

Page 131

the Harbour and Promenade area were developed to detailed design
stage and which include potential for enhanced walking and cycling
routes. This report has been shared with colleagues in Sustainable
Transport who have now been able to secure external funding and
have commissioned a contractor to develop options for improving
walking/cycling facilities linking Rothesay Pavilion, Ferry Terminal and
Albert Pier along the A844 Argyle Street / Victoria Street.  Part of this
will involve community consultation on the potential improvements. 
• The BANK Enterprise Space – Rothesay TH grant funded the full
operational costs relating to a popup and co-working space pilot, from
which substantial learning was derived. This pilot has provided a well-
used community space that delivers events, engagement
opportunities and temporary office space. 
• Rothesay Castle “Town and Sea” Projection – A two day event that
projected on to the castle wall, mural projects, based on the maritime
past of Bute and the colours, textures and materials that make up the
townscape. 
• Programme Evaluation – A contractor was commissioned in 2023 to
undertake an evaluation of the programme. The exercise evaluated
the impact of both the current programme and previous “Rothesay THI
2011-16” programme. A socio economic data and perception analysis
was also carried out as part of this exercise in order to compare data
with the previous programme. This report is being updated to include
the most recently completed buildings and will be finalised and
available following the programme closure in March 2024. 
5. CONCLUSION 
5.1. Programme staff are now working closely with owners and their respective
architects to ensure the successful completion of the remaining two building
projects. 
5.2. The 5 year programme has delivered a transformational benefit to the town
centre of Rothesay. This has complemented previous investment by the
“Rothesay Townscape Heritage Initiative 2011-16” programme that focused
on the eastern side of the town. 
5.3. Following completion of the programme at the end of March 2024 the
evaluation report will be finalised providing key outputs. 
Page 131

Page 132

6. IMPLICATIONS 
6.1. Policy - The Outcome Improvement Plan, Local Development Plan,
Economic Strategy and Economic Recovery Plan support town centre
regeneration and a diverse and thriving economy. 
6.2. Financial - Argyll and Bute Council funding of £200,000 is committed. In
addition, Rothesay TH is also made up of the following which do not include
the owners contributions: 
National Lottery Heritage Fund £1,888,500
Historic Environment Scotland      £500,000
Highlands and Islands Enterprise       £70,249
LEADER       £65,800
Smarter Choices Smarter Places       £21,500 
6.3. Legal - Grant contracts were provided to third parties. 
6.4. HR - A dedicated project officer has been recruited for the duration of the
project. Staff salaries are included within the project budget. 
6.5. Fairer Scotland Duty: 
6.5.1 Fairer Scotland Duty – None.
6.5.2 Equalities – None.
6.5.3 Socio-economic Duty – None.
6.5.4 Islands – This project benefits the town of Rothesay. 
6.6. Climate Change - No direct implications. The importance of this subject is
communicated to contractors to ensure that where possible climate
adaption and mitigation is considered to help create a thriving, sustainable
local economy and a healthier, happier place fostering lower carbon
lifestyles. 
6.7. Risk - That grant schemes are undersubscribed or that projects run over time
or budget. These risks will be carefully monitored and mitigation measures
introduced on a case by case basis. The coronavirus COVID-19 pandemic
also presents a risk to meeting project timelines and as such related
Government guidance will continually be reviewed. 
6.8. Customer Service - The council is responsible for administering Rothesay
Townscape Heritage grants on behalf of National Lottery Heritage Fund and
Historic Environment Scotland and for ensuring due diligence in the
performance of its duties.       
Page 132

Page 133

6.9. The Rights of the Child – None arising directly from this report.                   
Kirsty Flanagan, Executive Director with responsibility for Development and
Economic Growth 
Fergus Murray, Head of Development and Economic Growth 
Councillor Liz McCabe, Policy Lead for Islands and Business Development 
February 2024 
For further information contact: 
Colin Fulcher, Senior Economic Regeneration Officer, 
Transformation Projects and Regeneration Team 
Audrey Martin, Transformational Projects and Regeneration Manager 
Page 133

Page 134

This page is intentionally left blank

Page 135

ARGYLL AND BUTE COUNCIL  BUTE & COWAL AREA COMMITTEE 
COMMUNITY PLANNING AND
COMMUNITY DEVELOPMENT 
5th March 2024 
SUPPORTING COMMUNITIES FUND  - Monitoring of Projects Funded 
1.0 EXECUTIVE SUMMARY 
1.1 The purpose of this report is to provide monitoring information on the funding
given to community projects from the council’s Supporting Communities Fund. 
1.2 12 constituted, not-for-profit community organisations were awarded funding in
2022/23.  Projects were required to spend their funding within 18 months of and
submit an End of Project Monitoring Report outlining the project’s projected
costs, actual costs incurred and beneficiaries. 
1.3 Members are asked to consider the summary of information supplied by
organisations in their End of Project Monitoring Reports highlighting the
positive impact of projects in communities. 
1.4 Members are asked to note the return of unspent funds of £676.69 and agree
these are allocated to the 2024/25 round of Supporting Communities Fund. 
Page 135 Agenda Item 12

Page 136

ARGYLL AND BUTE COUNCIL  BUTE & COWAL AREA COMMITTEE 
COMMUNITY PLANNING AND
COMMUNITY DEVELOPMENT 
5th March 2024 
SUPPORTING COMMUNITIES FUND - Monitoring of Projects Funded 
2.0 INTRODUCTION 
2.1 This report highlights the positive outcomes for communities in Bute
and Cowal through the allocation of the Council’s Supporting
Communities Fund (SCF) in the 2022/23 round of funding. 
2.2 A total of £22,980.29 was awarded to 12 organisations in 2022/23.
Organisations have up to two months from the end of the project to
complete and return a project monitoring report.   
2.3 A total of £676.69 unspent funds has been returned; and is proposed to
be included in the distribution of the SCF for 2024/25. 
3.0 RECOMMENDATIONS 
It is recommended that the Bute and Cowal Area Committee: 
3.1      Note and consider the positive contribution of the Supporting
Communities Fund detailed in section 4 and the attached table. 
3.2 Note that a total of £676.69 in unspent funds has been returned and
agree that this be included in the distribution of the SCF for 2024/25. 
4.0 DETAIL   
4.1 The funded projects supported over 2,350 people to participate in a
variety of activities including outdoor, sports, music and activities to
support positive mental health. Highlights include:
• An immersive and inclusive outdoor heritage interpretation project
enabling children to access local archaeological sites, working with Bute
Museum and Ardencriag Gardens and a historian. The project
encouraged creativity, fun and self- expression with a drama tutor and
Page 136

Page 137

was delivered by Achievement Bute.
• A community food growing project by Kirn Primary pupils, partnering with
volunteers from the Grow Food Grow Dunoon project to grow and sell
year-round produce from a poly-tunnel and garden. School
environmental and climate topics linked to the project that was delivered
by Dunoon Community Development Trust.
• Live music was performed by Cowal Community orchestra, for Ukrainian
refugee events, Christmas and community Burns Suppers. With new
sheet music and musical director hours, the orchestra reached new
audiences and supported an opportunity for a talented young musician. 
• An exciting film project for people with additional support needs
encouraged participants to get moving and improve wellbeing after
Covid-19 and express themselves through choreographed dance. They
are reaching out to inspire others following the success of the project that
was delivered by Waterbaby Arts. 
4.2 The attached table summarises information received from individual
projects. 
4.3 12 grant recipients have submitted an End of Project Monitoring
Report. 
4.4 £676.69 in unspent funds has been returned; £676.69 to be included in
the distribution of the SCF for 2024/25. 
Page 137

Page 138

2022/23 SCF Round of Funding
No Organisation Project Funded Award End of Project Achievements
No. of people in
communities
benefitting 
1 Achievement Bute tutor fees, transport and
materials to support the
provision of a child-led
programme of heritage and
history based outdoor
activities 
£2,500.00  Our original aim was to build on the success of previous work to
offer children opportunities during school holidays to investigate,
explore and interpret local landmarks/buildings and/or sites of
historical interest.
We worked with volunteers from the Bute Museum and
Ardencraig Gardens Friends Group, together with a local
historian/archaeologist and freelance drama tutor and we created
a unique, educational immersive experience celebrating the history
of Ardencraig Gardens. 
Free minibus transport was included (with a wheelchairadapted
minibus) to ensure equality of access and no charge was made for
the activities.
181
2 Argyll & Bute Befrienders 40 sessions of therapeutic
and personal development
activities for young people 
£680.00 We met the aims of the project in that we provided opportunities
for disadvantaged children and young people to experience a
range of recreational and therapeutic activities with the support of
their befriender.  The main activities undertaken were various
sports including climbing, swimming, cycling and minigolf, arts and
crafts activities such as pottery painting and felting and several of
our young people benefited from horse-riding in small groups to
build their confidence and help them learn to regulate their
emotions.  
19 (A&B wide )
3 Argyll Mausoleum
Limited t/a Historic
Kilmun
preparation of a feasibility
study and delivery of a
community consultation for
the use of visitor centre at St
Munn's Church. 
£637.71 The original aim of the project had been to consult with the
community and stakeholders and using an architect to produce
documents with drawings to present to potential funders and
planning department for preplanning discussion about the future
of the building. This funding enabled us to carry out the first stage
of this.
68
4 Bute Community Land
Company
support for 6 community
engagement events and will
include the purchase of
£2,464.70 Our events provided people with an opportunity to gather and
meet like-minded people in a different social setting (the forest).
All of our events contained an element of catering which
395
Page 138

Page 139

2022/23 SCF Round of Funding
equipment and materials,
expert fees and marketing
costs.
encouraged people to socialise and chat about the event they had
just attended. As well as this the finish time for our events was
always kept loose where people were welcome to stay and chat for
as long as they liked.
5 Cairndow Community
Childcare
promotion, delivery and
administration of 6 days of
bicycle maintenance
workshop sessions.
£2,250.00 The cycle workshops proved very popular and were much
appreciated by those who attended. The levels of knowledge
regarding cycle maintenance were raised along with an awareness
of how to cycle safely in our locality.
The project has encouraged greater use of cycles in the area and a
greater ability for cyclists to maintain their bikes without having to
take them out with the area for repairs.
24
6 Cormonachan
Community Woodlands
Ltd
provision of two free
theatrical events during Her
Majesty the Queen’s
Platinum Jubilee, one event
aimed at children and the
other for adults
£2,000.00 We had 71 visitors attend the 2 free events on 3rd June 2022.:-
The Wonderland Adventure at 2 pm with 39 attendees including
lots of children and:
Macbeth the Red at 7 pm with 32 adult attendees.    We could not
have provided these events for the local community without this
valuable funding. 
71
7 Cowal Choral Club venue hire and Musical
Director fees to support the
delivery of musical events
and productions throughout
2022.
£2,500.00 The impact on club and local community members was positive.
The Club reduced isolation, establishing a WhatsApp group for
members in-between rehearsals. Club membership was boosted to
58 members.
We welcomed Ukrainians newly arrived in Dunoon, their inclusion
has benefited them and the club.
"…. I've enjoyed being back in rehearsals and especially back on
stage - but it's the camaraderie, friendship and support from all of
you that makes it extra special and all the more fun."
A review published in the Dunoon Observer following our first
production at the Queen’s Hall since 2014 demonstrated that the
Club are ‘back in business.’
58
8 Cowal Community
Orchestra
purchase of new music for
the orchestra and 50 hours
of Musical Director fees
£1,500.00 We played in Oban for the Ukrainian Refugees event and also in
Dunoon too.   One of our new members is Ukrainian.  Our
youngest member has also been playing with the Nicola
279
Page 139

Page 140

2022/23 SCF Round of Funding
Benedetti Conservatoire Orchestra which is so wonderful for
a 12 year old.   The Christmas Choir concert in Dunoon Burgh Hall
was a great example of cross musical talents coming together to
have a fun evening for the community.  We also attend Burns
Suppers to assist with tradition music too.  We also busk in the
town centre during the summer months so this attracts client
groups not necessarily attending concerts or organised events.
Herewith the concert programme    
and a sample of playing. 
11 J'est me, Le Divin Enfant.mp3 
9 Dunoon Community
Development Trust
volunteer expenses,
insurance, and the purchase
of materials, tools and plants
to create raised beds
£2,500.00 Our ‘Grow Food, Grow Dunoon’ working group established a
partnership initiative with Kirn Primary School to establish a
growing space in the school grounds. 
This space allowed a group of adult volunteers to create a ten-bed
rotation vegetable garden alongside the school’s existing poly-
tunnel. 
Food growing activities ran year-round with pupils from the school
actively involved with their teachers and the adult volunteers in
learning about our environment, our climate, nutrition, food
supply chains and the value of local growing.
1,000
10 Dunoon Junior Shinty
Club
training fees, Camanachd
Association Membership and
insurance for 8 voluntary
coaches, the purchase of 8
£2,500.00 This funding has helped us to provide safety equipment for
players; supported volunteer membership, insurance and
qualifications; and helped cover pitch fees so that club member
fees could be used to purchase more safety equipment (helmets)
137
Page 140

Page 141

2022/23 SCF Round of Funding
helmets and a contribution
to annual pitch fees
and playing equipment (sticks and balls). We ran a Family Fun Day
at Dunoon Stadium which saw over 50 people attending to take
part in fun games of shinty for all abilities.
11 Tighnabruaich
Development Trust 
60 Gaelic classes
online/face-to-face using
Speak Gaelic Materials, pre-
school sessions, Gaelic
holiday scheme play sessions
and outdoor workshop in
Glenan Community
Woodland 
£948.88  The ‘Bringing Gaelic Home’   day was a success.  The art club had
produced 50+ art works with Gaelic titles and descriptions. The
children’s story wring workshops were successful and enjoyed by
all.. Adults popped into the hall throughout the day to take part or
use the cafe, and the evening Ceilidh and meal was enjoyed by
many.
Gaelic classes using the Speak Gaelic materials are ongoing.  The
group meets weekly and will finish the first set of materials before
the summer.  The weekly on line zoom group is going well and are
a couple of weeks behind the ‘face to face’ group.
110
12 Waterbaby Arts SCIO 6 weeks of bespoke dance
workshops and 2 weeks of
filming for dancers with
additional support needs to
produce a film capturing
their creative response to
Covid-19 
£2,499.00  We produced 2 lovely films and exceeded expectations in the
impact that the films made on the public and dancers. The dancers
are now more enthused than ever and want to promote disability
awareness by teaching in schools and helping others make films.
We had so many workshops in choreography and basic movement
- everyone could see the change in the participants, ownership of
the film and their moves.
84 
Page 141

Page 142

5.0 CONCLUSION 
5.1 The project monitoring form has a section asking for comments on the
grant process.  Not all applicants have completed this section but of
those received, the comments have largely been very positive.   
6.0 IMPLICATIONS 
6.1 Policy: None 
6.2 Financial:  The report sets out the expenditure from the Bute & Cowal
area 2022/23 budget for the allocation of Supporting Communities Fund 
6.3 Legal: None 
6.4 HR: None 
6.5 Fairer Scotland Duty/Equalities/Islands: Compliant with policy and noting
that 2 of the funded projects were on the Isle of Bute. 
6.6 Climate Change: None 
6.7 Risk: None 
6.8 Customer Service: None 
6.9  The Rights of the Child (UNCRC): None 
Chief Executive – Pippa Milne
Policy Lead - Cllr Alistair Redman
Communities and Partnership Manager – Rona Gold
12 February 2024                                                  
For further information contact: Community Development Officer Ailie Law on
01546 604707 / ailie.law@argyll-bute.gov.uk. 
Page 142

Page 143

Area Plans Update
COMMUNITY PLANNING GROUP/ AREA
COMMITTEE
FQ4 2023/24
Stuart Green
Chief Executives Unit
Argyll and Bute Council
Page 143
Agenda Item
13

Page 144

#abplace2b
Area Plans – What, Why and How?
What?
 Creating area-based plans for all our communities,
reflecting investment opportunities and local service
prioritisation.
Why?
 Increase rate of external investment by improving how we
align with growing number of external funding streams (e.g.
government).
How?
 Through consensus, forward plan investment opportunities
that improve outcomes.
Page 144

Page 145

#abplace2b
Area Plans – Mandate
 Council Agreed Priorities – November 2022
 Corporate Plan 2023 - 2027;
 Agreed by Policy and Resources Committee – October
2023
 Number of locality plans.
 Purpose & Principles
 Approach
 Resourcing and timescales
 In addition; agreed to reflect any relevant outcomes from the
Community Planning Partnership Community Wealth Building
Review relevant to the Council in the approach to producing
area plans.
Page 145

Page 146

#abplace2b
No of
Locality
Plans
8 Areas
Page 146

Page 147

#abplace2b
Area Plans – Purpose & Principles
Purpose
 Capture community vision and aspirations for each area.
 Reflect investment opportunities
 Identify local projects.
Principles
1. The plans will be orientated towards maximising external funding.
2. The plans do not guarantee the provision of funding towards any of
the projects contained therein.
3. The plans will seek to promote proposals that are aligned with the
Council’s strategic plans and priorities. 
4. All projects delivered by the Council will be prioritised and
developed using our adopted project methodologies and processes. 
Page 147

Page 148

#abplace2b
What is in scope?
 Projects – planned and proposed by CPP Partners and
community groups.
 Community wealth building opportunities.
 Housing; needs, demands and opportunities.
 High level summary on socio economic data.
Collating this information provides a baseline narrative and
narrative. 
Page 148

Page 149

#abplace2b
Community engagement
 Important to get right.
 Sense of consultation fatigue (anecdotal).
 Scottish Government Islands Consultation
 Community Led Action Plans/ Charrettes
 ABOIP
 More to come.
 Community Planning Group Area Plans
 Local Development Plans – Local Place Plans
 Need to coordinate engagement with our communities.
Page 149

Page 150

#abplace2b
Efficient use of resources.
Area Plans
Community
Wealth
Building
CPG Area
Plans
 Clear synergies to develop in
tandem with;
 Community Planning Group
Area Plans.
 Community Wealth Building.
 Careful consideration given to;
 Efficient and optimal use of
resources.
 Co-ordinated consultation.
Page 150

Page 151

#abplace2b
Area plans - Approach
Stages Activity
1 Collation of information and data e.g. Scottish Government island 
consultation data, data from ABOIP place standard consultations, existing 
community led plans etc.
 
2 Engage community councils, development trusts and community groups 
initially to test our findings and identify gaps and update maps and plans.
 
3 Wider public consultation on draft vision and maps and plans.
 
4 Publish analysis on feedback from engagement on draft vision and maps 
and plans.
 
5 Submit vision and maps and plans to Members for consideration.
Page 151

Page 152

#abplace2b
Governance
and Flow of
Information Page 152

Page 153

#abplace2b
Phasing
 A phased but over-lapping approach is being taken to developing
the Area Plans which will allow a) most effective use of resources and
b) an iterative approach to learning from the process and identifying
optimum methodologies.   The phasing will be as follows; 
 Phase 1; two localities – one island(s) locality and one mainland locality.
 Phase 2; three localities – one island(s) locality, two mainland localities.
 Phase 3; three localities – one island(s) locality, two mainland localities.
 Each phase will run for 12 months from start to finish.
 Phases 2 and 3 will commence 3 months after the previous phase
starts. 
 The 3 phases will almost run concurrently with the total programme
scheduled to last 18 months (and not 36 months if run sequentially)
April 2024 to September 2025. 
 This is designed to expedite the process in the quickest time possible in
relation to the available resource. 
Page 153

Page 154

#abplace2b
How we will use the information?
 Area Plans should be viewed as a partnership document.
 Opportunity to capture all investments and aspirations for all to support
development of visions for each area.
 May support strategic partners in developing future investment decisions
and/or demonstrate community support.
 Plans will inform future opportunity for external funding.
 Effectively a ‘snap shot’ in time and does not prevent future
opportunities.
 The plans do not guarantee the provision of funding towards any of
the projects included but;
 Should provide clarity on opportunities, prioritisation, and improve
matching and opportunities with external funding (which is
significant).
Page 154

Page 155

#abplace2b
Your help please.
1. Identify all community groups in your area.
2. Identify all locations in your area suitable for individuals to see
and comment on draft proposals.  (This is to ensure individuals
that cannot or choose not to access plans digitally are not
excluded from the consultation process).  
3. Encourage Community Councils, Development Trusts and
Community Groups to participate in the process.
Page 155

Page 156

This page is intentionally left blank

Page 157

ARGYLL AND BUTE COUNCIL        BUTE & COWAL AREAL COMMITTEE 
DEVELOPMENT AND ECONOMIC GROWTH                5TH MARCH 2024 
PORT RIDDELL SLIP – UPDATE AND FUTURE OPTIONS 
1.0 EXECUTIVE SUMMARY 
1.1 This report provides members with an update on Port Riddell Slip, Dunoon
following the decision to remove the project from the Rural Growth Deal (RGD)
Tourism and Place Programme.  As part of the options appraisal process for the
Rural Growth Deal Argyll and Bute Council commissioned Stantec and Mott
MacDonald to undertake a high level ‘Condition and Initial Option Development
Report’ to consider the options for the redevelopment of Port Riddell Slip. A copy
of the report is included in Appendix 1 of this report. 
1.2 The RGD Programme Board made the decision in May 2023 to remove this
project from consideration for funding under the RGD as it was unlikely that a
robust business case in the context of the Treasury Five-Case Model could be
made for such an investment.  As such, it was very unlikely that this project would
meet the criteria necessary for investment via the RGD. 
1.3 It is recommended that the Area Committee: 
• Note that members of the local community have indicated that there
remains interest in the redevelopment of Port Riddell Slip to facilitate
enhanced access to the local marine environment for leisure activities.
• Note that Port Riddell Slip is no longer part of the RGD programme and no
funding has currently been identified to progress any enhancements to this
facility.  This project could be considered for future grant funding bids or a
community asset transfer.
• Note that the facility is currently in a poor state of repair and vehicular
access from the A815 has been restricted however, members of the public
can still access the facility on foot.  Consideration should be given to
installing signage advising the public that use of the facility is at their own
risk.   
Page 157 Agenda Item 14

Page 158

ARGYLL AND BUTE COUNCIL        BUTE & COWAL AREAL COMMITTEE 
DEVELOPMENT AND ECONOMIC GROWTH                5TH MARCH 2024 
PORT RIDDELL SLIP – UPDATE AND FUTURE OPTIONS 
2.0 INTRODUCTION 
2.1 This report provides members with an update on Port Riddell Slip, Dunoon
following the decision to remove the project from the Rural Growth Deal (RGD)
Tourism and Place Programme.   
2.2 The RGD considered Dunoon for funding under the “Tourism - Creating a World
Class Visitor Destination” Theme. A long list of project options were drawn up
with the support of the RGD Tourism Steering Group. 
2.3 Port Riddell Slip was included in the options list following a request by the
Dunoon CARS Officer and Visit Scotland.  The RGD Programme Management
Office were advised that local Community Groups and Dunoon Presents (BID)
had previously contacted the Council looking for assistance to fund
improvements at Port Riddell, however to date had not been successful in any
bid for funding. 
2.4 Argyll and Bute Council commissioned Stantec and Mott MacDonald to
undertake a high level ‘Condition and Initial Option Development Report’ to
consider the options for the redevelopment of Port Riddell Slip. The Report was
completed in June 2023 and is included in Appendix 1 of this briefing note. 
2.5 The RGD Programme Board made the decision in May 2023 to remove this
project from consideration for funding under the RGD as it was unlikely that a
robust business case in the context of the Treasury Five-Case Model could be
made for such an investment.  As such, it was very unlikely that this project
would meet the criteria necessary for investment via the RGD. 
2.6 RGD tourism funding is now focussed on the completion of Rothesay Pavilion
and the Kintyre Seasports project.  This decision was endorsed by the Councils
Policy and Resources Committee in August 2023.
Page 158

Page 159

3.0  RECOMMENDATIONS 
It is recommended that the Area Committee: 
3.1 Note that members of the local community have indicated that there remains
interest in the redevelopment of Port Riddell Slip to facilitate enhanced access to
the local marine environment for leisure activities.
3.2 Note that Port Riddell Slip is no longer part of the RGD programme and no
funding has currently been identified to progress any enhancements to this
facility.  This project could be considered for future grant funding bids or a
community asset transfer.
3.3 Note that the facility is currently in a poor state of repair and vehicular access
from the A815 has been restricted however, members of the public can still
access the facility on foot.  Consideration should be given to installing signage
advising the public that use of the facility is at their own risk.
4.0  DETAIL
4.1 The facilities at Port Riddell consist of a concrete slipway, adjacent parking area,
vehicular access ramp, dis-used Victorian changing rooms and pedestrian steps
from the A815.  There are 9 small Victorian changing rooms, located below the
A815 promenade, which have been closed for some time. It is believed that
these changing rooms accompanied a historic bathing area (public open air
swimming pool / lido) that has since been capped with a concrete slab. Figure 1
gives an Overview of the Port Riddell area:  
4.2 Mott MacDonald’s walkover inspection found that the structures at Port Riddell
require considerable repair for the facilities to be brought back into use for
launching leisure vessels and to improve waterfront access. Discussions with
community representatives have shown that the main desired use for a
redevelopment of Port Riddell is to allow the launching of small craft, kayaks and
Page 159

Page 160

access for wild swimming. The lack of water access within Dunoon is a key
concern for the Dunoon community.  
4.3 The key defects observed by Mott MacDonald were:
• Large areas of the vehicle approach and parking area concrete slab are
dislodged, spalled or missing,
• Cracks and open joints are visible along the parking area seaward and
rear walls
• Changing rooms are in poor condition.
4.4 Mott MacDonald have advised the Council that if works to Port Riddell Slip are
not undertaken, consideration should be made as to whether the area is still
safe for the public to access, given the poor condition of the concrete on the
vehicle approach. The area is generally in poor condition and could pose a
Health and Safety risk to the public and put the Council at risk of action should
any member of the public suffer injury.  
4.5 It should be noted that vehicular access to the Port Riddell Slip from the A815 is
currently restricted by a traffic bollard however, the facility can be accessed on
foot by members of the public.  During a site visit, the Council were observed to
be treating the existing slipway for marine growth. 
Potential Improvements and Costs
4.6 Options and high level cost estimates for improving the infrastructure at Port
Riddell were explored by Mott MacDonald and these are set out in Table 3.1
below:- 
Table 3.1 – Summary of Options and high level cost estimates 
Option Summary Estimated CAPEX
Range
1 Make good the existing structures  £150,000 - £240,000
2 Provide adequate turning area for
vehicles (includes option 1)
£270,000 - £440,000
3 Extend and widen the slipway (includes
options 1 and 2)
£450,000 - £730,000
4 Refurbish the changing rooms (includes
option 1)
£260,000 - £420,000
5 Provide a new facilities block £100,000 - £160,000 
4.7 At this time, no funding has been identified to undertake any of the options listed
in Table 3.1 however, it is considered that this project could be considered for
future grant funding applications by the Council.
4.8 There could also be an opportunity for a Community Asset Transfer of the Port
Riddell Slipway and Changing Rooms, which may open up additional funding
routes. This would need to be considered further to understand the most
appropriate organisation to take on ownership or if there is community appetite
for this.
Page 160

Page 161

5.0  CONCLUSIONS 
5.1 Port Riddell Slip was considered as part of the Rural Growth Deal options
appraisal process however, this project was not progressed as it was unlikely that
a robust business case in the context of the Treasury Five-Case Model could not
be made for such an investment.  
5.2 There remains an aspiration from some members of the local community and
stakeholders such as Visit Scotland to redevelop the Port Riddell slip to facilitate
enhanced access to the marine environment for leisure activities.
5.3 No funding has currently been identified to progress any enhancements to this
facility however, there may be future opportunities to consider this project for grant
funding bids or a community asset transfer. 
5.4 The facility is currently in a poor state of repair and vehicular access from the
A815 has been restricted via a traffic bollard however, members of the public can
still access the slipway and changing area on foot.  Consideration should be given
to installing signage advising the public that use of the facility is at their own risk. 
6.0  IMPLICATIONS
6.1  Policy – The RGD is consistent with the Council’s Economic Strategy.
6.2  Financial – No funding has been identified to progress enhancements at Port
Riddell Slip.
6.3  Legal – none known.
6.4  HR – none known.
6.5  Fairer Scotland Duty: 
6.5.1  Equalities - protected characteristics – where appropriate EqSEIAs will be 
carried out to identify any implications. 
6.5.2  Socio-economic Duty – where appropriate EqSEIAs will be carried out to 
identify any implications. 
6.5.3  Islands – none known.
6.6.  Climate Change –none known.
6.7   Risk – current facility is in a poor state of repair creating a risk to members of the
public who access it.
6.8  Customer Service – none known.
6.9 The Rights of the Child (UNCRC) – no implications. 
Page 161

Page 162

Kirsty Flanagan Executive Director with responsibility for Development and
Economic Growth
Policy Lead for Strategic Development, Councillor Robin Currie
January 2024 
For further information contact:
Fergus Murray, Head of Development and Economic Growth 
fergus.murray@argyll-bute.gov.uk  
Jonathan Welch, Rural Growth Deal Programme Manager 
jonathan.welch@argyll-bute.gov.uk   
Appendix 1 – Port Riddell Condition Report and Initial Options Development
Page 162

Page 163

Port Riddell
Condition Report and Initial
Option Development
June 2023
Page i of v
Page 163

Page 164

This page left intentionally blank for pagination.
Page ii of v
Page 164

Page 165

Page iii of v
Mott MacDonald
St Vincent Plaza
319 St Vincent Street
Glasgow G2 5LD
United Kingdom
T +44 (0)141 222 4500
mottmac.com
Argyll and Bute Council
Kilmory
Lochgilphead
Argyll
PA31 8RT
Mott MacDonald Limited. Registered in
England and Wales no. 1243967.
Registered office: Mott MacDonald House,
8-10 Sydenham Road, Croydon CR0 2EE,
United Kingdom
Port Riddell
Condition Report and Initial
Option Development
June 2023
Page 165

Page 166

Mott MacDonald | Port Riddell Condition Report and Initial Option Development Page iv of v
Issue and Revision Record
Revision Date Originator Checker Approver Description
A 12.06.23 Graduate Project
Manager
Project Director For Client Comment
Document reference: A |
Information class: Standard
This document is issued for the party which commissioned it and for specific purposes connected with the above-
captioned project only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used
for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us
by other parties.
This document contains confidential information and proprietary intellectual property. It should not be shown to other
parties without consent from us and from the party which commissioned it.
Page 166

Page 167

Mott MacDonald | Port Riddell Condition Report and Initial Option Development Page v of v
Contents
Executive Summary 1
1 Introduction 2
1.1 General 2
1.2 Background and Record Information 2
1.3 Description of the Structure 2
1.4 Scope of Inspection and Limitations 3
2 Condition Summary 4
2.1 Access Ramp 4
2.2 Parking Area 5
2.3 Slipway 6
2.4 Historic Bathing Area 7
2.5 Victorian Changing Rooms and Walkway 8
3 Option Development and Cost Estimates 9
3.1 Make Good Existing Structures 9
3.2 Widen Entrance and Provide Increased Turning Area 9
3.3 Extend and Widen Existing Slipway 9
3.4 Refurbish Existing Changing Rooms 10
3.5 Provision of Facilities Block 11
3.6 Cost Estimates 11
3.7 Next Steps 11
A. Overview Drawings for Information 12
B. Photographs 13
Page 167

Page 168

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 1 of 20
Executive Summary
The facilities at Port Riddell, Dunoon, consist of a concrete slipway, adjacent parking area,
vehicular access ramp, dis-used Victorian changing rooms and pedestrian steps from the A815.
Limited information is known about the historic use of the structures and as-built records are not
available.
There are 9no. small Victorian changing rooms at Port Riddell, located below the A815
promenade. These have been closed for some time. It is believed that these changing rooms
accompanied a historic bathing area (public open air swimming pool / lido) that has since been
capped with a concrete slab.
Mott MacDonald were appointed by Stantec Ltd, on behalf of Argyll and Bute Council, to
undertake a topside walkover of Port Riddell to ascertain the general condition of the existing
structures and to provide potential engineering options and associated cost estimates for the
repair or future development of Port Riddell. Indicative plans for redevelopment have been
provided by Argyll and Bute Council for consideration. These plans improve access to the
waterfront and would facilitate use by small leisure craft, launching of kayaks or similar activities.
MML’s walkover found that the structures at Port Riddell require considerable repair for the
facilities to be brought back into use for launching leisure vessels and to improve waterfront
access.
Options for improving the infrastructure at Port Riddell were developed identified by Argyll and
Bute Council and have been further developed by Mott MacDonald. The access route and slipway
could be widened, and a facilities block could be provided either on the promenade or in the
location of the existing capped lido. The changing rooms could also be refurbished. This report
does not consider redevelopment or re-opening of the lido.
The key defects found were:
● Large areas of the vehicle approach and parking area concrete slab are dislodged, spalled or
missing,
● Cracks and open joints are visible along the parking area seaward and rear walls, and
● Changing rooms are in poor condition.
This report presents the following 5 options to repair or upgrade the facilities at Port Riddell:
Table 1.1: Summary of options and costs
Option Estimated CAPEX Range
1. Make good the existing structures £150,000 - £240,000
2. Provide adequate turning area for vehicles (includes Option 1) £270,000 - £440,000
3. Extend and widen the slipway (includes Option 1 and 2) £450,000 - £730,000
4. Refurbish the changing rooms (includes Option 1) £260,000 - £420,000
5. Provide a new facilities block (subject to size and facilities offered) £100,000 - £160,000
The preliminary cost estimates are based on experience of similar projects.
Page 168

Page 169

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 2 of 20
1 Introduction
1.1 General
Mott MacDonald Ltd (MML) were appointed by Stantec Ltd, on behalf of Argyll & Bute Council
(A&BC), to undertake a visual walkover and condition assessment of the existing structures at
Port Riddell. MML have reviewed and further developed A&BC’s proposals and have produced
cost estimates for future development at Port Riddell.
The aim of the walkover was to visually assess the condition of the structures at Port Riddell and
was carried out on the 12th of April 2023 along with colleagues from Stantec and Argyll and Bute
Council.
This report details the following:
● Findings of MML’s site walkover, along with review of any existing information to better
understand the site history and current condition of the existing structures, and
● 5 no. potential development options and the anticipated capital costs.
1.2 Background and Record Information
There is limited information available regarding the history of the structures at Port Riddell and
as-built records, or records of repairs, are not available. The age of the infrastructure is unknown.
However, from a search on the Argyll and Bute Council website, a set of minutes from a Strategic
Policy Committee meeting in November 2003 confirms that Port Riddell would have been used
as a bathing area, to which the Victorian changing rooms would be associated.
A&BC advise the slipway has been previously used for the launching of small leisure craft.
The following appendices present supplementary information:
● Appendix A: A&BC’s overview drawings and potential future plans
● Appendix B: MML’s site photographs (2023)
1.3 Description of the Structure
Port Riddell is approximately 0.5 miles north of Dunoon Ferry Terminal, directly adjacent to the
A815. There is an approach ramp from the A815 that leads to a small parking area at the head of
a concrete slipway. Vehicle access is currently restricted at the entrance from the A815. Port
Riddell includes a historic bathing area, capped with a concrete slab and 9no. disused Victorian
changing rooms at the north-eastern extent of the site.
The above elements can be seen in Figure 1 below.
Page 169

Page 170

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 3 of 20
Figure 1: Port Riddell Overview
More information on the current condition of the structures is provided in Section 2 of this report.
1.4 Scope of Inspection and Limitations
The scope of this inspection included a top-side walkover of the infrastructure at Port Riddell
around low tide. Structural assessments or intrusive surveys have not been undertaken.
The majority of the structures are within the ‘splash zone’ and their use may be subject to tidal
restrictions and ongoing maintenance to remove marine growth.
MML’s site walkover was limited to areas that are accessible by the public, noting the lido and
Victorian changing rooms are sealed with concrete blockwork and the internal condition of one
changing room only could be viewed via gaps in the concrete blocks.
This report does not consider redevelopment of the bathing area.
Victorian Changing Rooms
Concrete Slipway
Historic Bathing Area
Parking Area
Access Ramp from A815
Page 170

Page 171

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 4 of 20
2 Condition Summary
This section provides a summary of the condition of the structures at Port Riddell as informed
MML’s walkover.
2.1 Access Ramp
The access ramp is approximately 7.2m wide and 30m long. Vehicular access to the ramp is
currently restricted by a traffic bollard and the route passes over the public promenade, as shown
in the photograph in Appendix B.1. The entrance to the access ramp from the A815 is narrowed
by low-level brick walls, also shown in the photo in Appendix B.1.
Figure 2: Approach Ramp and Parking Area
There is a small set of steps approximately 10m from the head of the access ramp, with railings
either side. These steps narrow the width of the access ramp by approximately 2m and would
prohibit two-way traffic on the ramp.
There is handrailing on the seaward side of the access ramp that terminates approximately 2m
from of the base of the ramp.
The vertical wall to the seaward side of the access ramp is protected by rock armour at the toe of
the structure, and then by a section of formal revetment with stone pitching at the base of the
ramp, as can be seen in the photograph in Appendix B.2. The pitching appears to be in fair
condition; however, mortar loss is observed between the paving stones and the toe of the
revetment is some distance above the beach level; this may be due to a number of reasons
including: seasonal or storm related beach mobility, local scour around the manmade hard
structures etc.
The structural form of the vertical wall is unknown. It could be masonry with a protective facing –
with cracks following the bedding joints. Alternatively, the cracks could be associated with cold
joints as concrete was placed in layers.
Page 171

Page 172

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 5 of 20
2.2 Parking Area
The parking area at the head of the slipway is approximately 7.2m wide x 30m long and comprises
a concrete slab that is raised approximately 1 – 1.5m above the current beach level. There is
scattered rock armour placed in front of the parking area, as can be seen below and in the
photographs in Appendix B.2 and B.4.
The concrete slab to the parking area is in poor condition with large areas of broken and dislodged
concrete, rebar exposed and cracking of the concrete visible. These defects are observed over
the majority of the surface and can be seen in Appendices B.2 and B.3.
At the beach, the seaward face of the concrete structure does not appear to be undermined;
however, cracks, spalled concrete and voids are observed on the vertical face. The joint between
the seaward face of the wall and the concrete slab to the parking area has widened over time,
allowing seawater below the slab, potentially worsening the condition of the structure. This can
be seen in the photograph in Appendix B.3.
To the rear of the parking area, there is a concrete wall, approximately 2.5 – 3.0m high, which
retains the public promenade. This wall has various horizontal cracks along its length, with small
areas of concrete spalling around the cracks, this can be seen in the photograph in Appendix B.5.
This rear wall is also within the splash zone, with potential corrosion of any reinforcement within
the concrete; however, this was not visible during MML’s walkover.
There is a drainage pipe, assumed to be a surface drainage pipe from the promenade above, that
discharges directly onto the parking area, also shown in the photograph in Appendix B.5.
There is a further set of steps leading to the promenade from the north-east corner of the parking
area, these steps are also at the head of the concrete slipway and can be seen in Figure 5.
Figure 3: View of Parking Area and Access Ramp from Slipway
Page 172

Page 173

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 6 of 20
2.3 Slipway
The concrete slipway has an apron extending from the parking area / in front of the historic bathing
area. The apron is approximately 23.5m wide at the top and narrows to 3.5m along the main
section of the slipway. The length of the slipway is unknown, and the toe of the slipway was not
visible during MML’s site walkover.
Figure 4: Concrete Slipway
Anecdotally, A&BC advise that the current slipway gradient is acceptable, however the slipway is
currently too narrow and abruptly ends, therefore it is considered unsafe to launch/recover small
craft.
The joint between the slipway apron and the parking area has widened, with voids visible in the
wall at the corner of the apron, show in the photograph in Appendix B.3.
The slipway appears in fair condition with no undermining of the structure visible on either side of
the slipway or the apron during MML’s walkover.
Page 173

Page 174

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 7 of 20
2.4 Historic Bathing Area
The parking area is bound to the east by the historic concrete bathing area / lido. The bathing
area has been capped with a concrete slab, and potentially infilled. This can be seen below and
in the photograph in Appendix B.6.
Figure 5: Historic Bathing Area
There are cracks present around the bathing area walls, some of which are potentially joints that
have widened over time. Similar to the vertical wall at the access ramp, the structural form is
unknown and could be masonry with a protective facing – with cracks following the bedding joints.
Alternatively, the cracks could be associated with cold joints as concrete was placed in layers.
There are also some gaps in the seaward wall of the bathing area that have been filled with what
is assumed to be timber. It is assumed that these were originally associated with water
inlets/drainage infrastructure from the bathing area.
There are two drainage outfalls that discharge directly onto the concrete cap of the bathing area.
This discharge then flows over the bathing area and down onto the walkway towards the Victorian
changing rooms, leading to an accumulation of algae/marine growth at the top of the steps to the
beach. This is shown in the photograph in Appendix B.11. This is noted as a health and safety
hazard as the algae/marine growth is extremely slippery and makes the steps unsafe for use.
Page 174

Page 175

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 8 of 20
2.5 Victorian Changing Rooms and Walkway
To the north of the historic bathing area, there are 9no. disused Victorian changing rooms which
can be accessed via a 0.7m wide walkway. The changing rooms are directly below the public
promenade retained by the seawall. Anecdotal evidence from A&BC confirms use of the changing
rooms would be tidally restricted. The walkway is approximately 0.8m above the beach level and
a set of steps beside the bathing area leads from the walkway down to the beach. There are no
handrails present.
Figure 4: Victorian Changing Rooms and Walkway
The changing rooms are currently not in use and are blocked off with lightweight concrete blocks,
therefore the condition of each of the changing rooms is unknown. However, the top row of blocks
at changing room 1 is missing and the internal space could be viewed using a camera, as shown
in photograph in Appendix B.12. Changing room 1 is approximately 1.5m wide x 1.9m high x 2.5m
deep. The walls and ceiling of changing room 1 appear in fair condition; however, a render or
painted surface has been used on the surfaces, therefore the condition of the blocks making up
the structural wall is unclear.
The exposed edge of the concrete roof slab above the changing rooms varies in condition along
the length. There are sections with spalling concrete, large cracks and portions missing, as shown
in the photograph in Appendix B.10.
The walkway in front of the changing rooms appears in good condition with the exception of the
corner nearest the steps down to the beach. This section appears to be undermined where the
steps meet the wall and voids are present here. The voids were not measured due to the presence
of large amounts of algae and seaweed on the steps making them unsafe. This is shown in the
photographs in Appendix B.10 and B.11.
Page 175

Page 176

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 9 of 20
3 Option Development and Cost Estimates
This section presents development options that Argyll and Bute Council have asked to be
explored in relation to the redevelopment of Port Riddell. Preliminary cost estimates for each
option are presented in Section 3.6.
Some of the development options should not be considered in isolation. These are noted
accordingly.
3.1 Make Good Existing Structures
The first option would be to make good the existing structures, including:
● Repair the parking area slab,
● Repair the parking area rear wall,
● Repair the parking area seaward wall,
● Repair the corner of the walkway wall at the beach access steps, and
● Replace the missing blocks at the changing rooms to block them off.
This option would bring the structures at Port Riddell back into a good condition. However, it does
not address safety concerns over the existing width and sudden termination of the slipway. The
bathing area and Victorian changing rooms would remain closed.
3.2 Widen Entrance and Provide Increased Turning Area
The second option could be to improve vehicular access from the A815 to the slipway, and
therefore includes all elements in Option 1, plus:
● Widen the entrance to the site from the A815 to allow for a two-way junction,
● Remove set of steps near the top of the access ramp,
● Remove rock armour in front of historic bathing area,
● Repair parking area structure (deck slabs, seaward and rear walls),
● Remove historic bathing area concrete cap and lido structure,
● Provide new concrete deck below historic bathing area, and
● Reinstate rock armour in front of parking area.
Again, this option does not address safety concerns over the existing width and sudden
termination of the slipway. The bathing area and Victorian changing rooms would remain closed.
3.3 Extend and Widen Existing Slipway
This option would require the provision of an adequate turning area and therefore includes all
elements in Options 1 and 2, plus:
● Widen the existing slipway by 1.5m, and
● Extend the existing slipway by 5.0m.
This would allow for vehicles to bring leisure craft on trailers to Port Riddell and launch them from
the slipway. The removal of the historic bathing area would provide a ‘T-head’ area of
approximately 30m long in which vehicles could facilitate turning at the top of the slipway.
Page 176

Page 177

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 10 of 20
3.4 Refurbish Existing Changing Rooms
This option could be undertaken either in conjunction with the above options, or separately;
however, the existing structures would require to be made good (Option 1), so they are safe for
public access. This option would require:
● Make good existing structures to eliminate any health and safety risks (parking area deck and
seaward and rear walls),
● Removal of concrete blockwork to open the changing rooms,
● Removal of beach access steps,
● Reclamation of approximately 0.5m of land to the seaward side of the walkway to increase
width to 1.2m,
● Removal of step at changing rooms and reprofile to provide EA compliant access,
● Construction of new beach access ramp,
● Installation of a handrail round the walkway from the bathing area and along in front of the
walkway in front of the changing rooms,
● Repairs to the concrete exposed edge of the roof slab above the changing rooms,
● Repairs to the internals of the changing rooms (floors, walls and ceilings), and
● Refurbishment of the changing rooms (provision of doors, drainage, painting / tiling, etc.).
This option would allow for the changing rooms to be used by swimmers, kayakers, etc. However,
the changing rooms would require locks or a form of security in order to prevent misuse or
vandalism. The changing rooms would require adequate drainage to ensure that any water from
swell / waves does not collect inside the changing rooms. The existing changing rooms height is
1.9m which may decrease further depending on the repairs required. M&E upgrades have not
been considered.
MML have experience of developing proposals for beach huts and chalets as part of other
seafront development projects and masterplans. Key features of these proposals highlighted the
importance of resilience, security, accessibility, and drainage. Recent examples are shown below:
Figure 5: MML’s example beach chalet project
Page 177

Page 178

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 11 of 20
3.5 Provision of Facilities Block
A final addition to Port Riddell could be a ‘facilities block’ with a connection to existing services
that would provide toilets and cold-water showers. There are various locations in which the
facilities block could be positioned: the bathing area could be removed, and the block positioned
there, or the facilities block could be located at road level through the removal of a section of the
existing on-street parking.
If the facilities block were to be provided at road level, this may impact on the views of those who
reside on the opposite side of the A815. However, the facilities block would likely be within the
splash zone if located where the historic bathing area is positioned; this would increase the cost
of the building and would result in an increased maintenance burden given increased exposure
to waves etc. and the high levels of corrosion experienced in this area.
There are a number of options for provision of a facilities block, including:
 Modular building at street level,
 Permanent building at street level, or
 Permanent building at slipway level (not recommended for the reasons described above).
3.6 Cost Estimates
Preliminary cost estimates for the five repair / development options are based on experience of
similar projects including feedback on previous cost estimates. The table below summarises the
estimated capital costs associated with each of the options above.
Option Estimated CAPEX Range
1. Make good the existing structures £150,000 - £240,000
2. Provide adequate turning area for vehicles (includes Option 1) £270,000 - £440,000
3. Extend and widen the slipway (includes Option 1 and 2) £450,000 - £730,000
4. Refurbish the changing rooms (includes Option 1) £260,000 - £420,000
5. Provide a new facilities block (subject to size and facilities offered) £100,000 - £160,000
3.7 Next Steps
MML advise the next steps would include further liaison with potential users and the public and
rationalisation of the options to agree what features should be included in the preferred option.
Page 178

Page 179

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 12 of 20
A. Overview Drawings for Information
Page 179

Page 180

3.5m wide slipway
remains of groin
700mm wide walkway outside changing
room recesses under promenade
brick planters
main level
promenade level
footpath to parkingroadway level
concrete mass
main stair
second stair
vehicle access with centre bollard
stair down to beach
A-A
0201
Title
Scale at A3
RevStatusDrawing Number
Client
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.
Suit. Code
MMD Project No.
Security
Suitability Description
App'dCh'k'dDescriptionDrawnDateRev
Seq. Number
P1
14/04/2023 16:27:26 C:\BIM\Dunoon.rte
1 : 500
St Vincent Plaza
319 St Vincent St
Glasgow, G2 5LP
United Kingdom
T    +44 (0)141 222 4500
F    +44 (0)141 221 2048
W    www.mottmac.com
100401059
S0
Suitable for Review & Comment
Client Name Port Riddell Slipway
Client Line 1
Client Line 2
Client Line 3
PRE
Client Line 4
MMDL-MMD-00-XX-DR-A-0201 STD
SHEET 1
ARCHITECTURAL
STANDARD NOTES
Layout
14/04/2023
DRAFT SUITABLE FOR
INFORMATION
000
.1 : 500
Site Layout
.
3D View
P1 14.04.23 DR PRELIMINARY ISSUE FOR INFO
.1 : 500
Section A-A
Page 180

Page 181

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 13 of 20
B. Photographs
Page 181

Page 182

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 14 of 20
Figure B 1: Entrance from A815
Figure B 2: Paved revetment and access ramp
Page 182

Page 183

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 15 of 20
Figure B.3: View of broken deck slabs at parking area, joint with head of slipway
Figure B.4: Rock armour in front of parking area
Page 183

Page 184

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 16 of 20
Figure B.5: Wall to the rear of the parking area
Figure B.6: View of capped bathing area from above
Page 184

Page 185

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 17 of 20
Figure B.7: Concrete slipway from parking area
Figure B.8: View of slipway from in front of bathing area
Page 185

Page 186

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 18 of 20
Figure B.9: Walkway around bathing area towards Victorian changing rooms
Figure B.10: Walkway in front of Victorian changing rooms
Page 186

Page 187

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 19 of 20
Figure B.11: Steps down to beach in front of Victorian changing rooms
Figure App B.12: Inside of changing room 1
Page 187

Page 188

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 20 of 20
mottmac.com
Page 188

Page 189

Bute and Cowal Area Committee 
Workplan 2024-2025 
Committee Date Report Description Lead Service and contact
officer
Regularity of
occurrence/
consideration
Date for Reports
to Committee
Services
Additional
Comment
March 2024     
5 March 2024 Area Performance
Report – FQ3
2023/24
Customer Support 
Services – 
Sonya Thomas
Quarterly Report 9 February 2024 
5 March 2024 Area Plans Update Customer Support 
Services – 
Stuart Green
As Required 9 February 2024 
5 March 2024 Roads and
Infrastructure
Service Update
Roads and 
Infrastructure – 
Mark Calder
Quarterly Report 9 February 2024 
5 March 2024 Housing Services
Activity Update -
Strategic Housing
Investment Plan
(SHIP) - Annual
Update
Development and Economic
Growth –
Douglas Whyte 
Annual Report 9 February 2024 
5 March 2024 Supporting
Communities Fund -
Monitoring of
Projects Funded
Chief Executive –
Ailie Law
Annual Report 9 February 2024 
5 March 2024 Primary School
Report
Education – 
Louise Lawson 
Annual Report 9 February 2024 
5 March 2024 Rothesay
Townscape
Heritage Scheme –
Development and Economic
Growth –
Colin Fulcher
As Required  9 February 2024 
Page 189
Agenda Item
15

Page 190

Bute and Cowal Area Committee 
Workplan 2024-2025
Committee Date Report Description Lead Service and contact
officer
Regularity of
occurrence/
consideration
Date for Reports
to Committee
Services
Additional
Comment
March 2024 Final
Update 
5 March 2024 Port Riddell Slip –
Update and Future
Options
Development and Economic
Growth –
Jonathon Welch 
As Required 9 February 2024 
5 March 2024 2023/24 Active
Travel Progress
Report 
Development and Economic
Growth –
Colin Young
As Required 9 February 2024 
5 March 2024 Roads Capital
Reconstruction
Programme 2024/25 
Roads and 
Infrastructure – 
Jim Smith
As Required 9 February 2024 
June 2024     
4 June 2024 Secondary School
Report – Dunoon
Grammer School
Education – David Mitchell Annual Report 10 May 2024 
4 June 2024 Secondary School
Report – Rothesay
Joint Campus
Education – Louise Nicol Annual Report 10 May 2024 
4 June 2024 Area Performance
Report – FQ4
2023/24
Customer Support 
Services – 
Sonya Thomas
Quarterly Report 10 May 2024 
4 June 2024 Roads and
Infrastructure
Service Update
Roads and 
Infrastructure – 
Mark Calder
Quarterly Report 10 May 2024 
4 June 2024 HSCP Bi-Annual
Performance Report
Health & Social Care 
Partnership – 
Bi-Annual Report 10 May 2024 
Page 190

Page 191

Bute and Cowal Area Committee 
Workplan 2024-2025
Committee Date Report Description Lead Service and contact
officer
Regularity of
occurrence/
consideration
Date for Reports
to Committee
Services
Additional
Comment 
Charlotte Craig
4 June 2024 Cruach Mor and
Clachan Flats
Windfarm Trusts
Legal & Regulatory 
Support – 
Stuart McLean
Annual Report/
For Noting
10 May 2024 
4 June 2024 Supporting
Communities Fund
Applications
2024/25
Chief Executive –
David Hagerty
Annual Report 10 May 2024 
September 2024     
3 September 2024 Area Performance
Report – FQ1
2024/25
Customer Support 
Services – 
Sonya Thomas
Quarterly Report 9 August 2024 
3 September 2024 Roads and
Infrastructure
Service Update
Roads and 
Infrastructure – 
Mark Calder
Quarterly Report 9 August 2024 
3 September 2024 Recycling and
Recovery
Performance 
Roads and 
Infrastructure –
John Blake
Annual Report  9 August 2024 
December 2024     
3 December 2024 Area Performance
Report – FQ2
2024/25
Customer Support 
Services – 
Sonya Thomas
Quarterly Report 8 November
2024 
3 December 2024 HSCP Bi-Annual
Performance Report 
Health & Social Care 
Partnership – 
Charlotte Craig
Bi-Annual Report 8 November
2024 
3 December 2024 Charitable Trusts,
Bequests and Trust
Funds
Legal & Regulatory 
Support – 
Stuart McLean
Annual Report 8 November
2024 
Page 191

Page 192

Bute and Cowal Area Committee 
Workplan 2024-2025
Committee Date Report Description Lead Service and contact
officer
Regularity of
occurrence/
consideration
Date for Reports
to Committee
Services
Additional
Comment
3 December 2024 ACHA Annual
Update
ACHA – 
Chief Executive 
Annual Report/
Presentation
8 November
2024 
3 December 2024 The Third Marquis
of Bute’s Silver
Wedding Dowry
Fund
Legal & Regulatory 
Support – 
Stuart McLean
As Required  8 November
2024 
3 December 2024 The Provost’s fund
(Bute) – Award
Recommendations 
Legal & Regulatory 
Support – 
Stuart McLean
As Required 8 November
2024 
3 December 2024 Roads and
Infrastructure
Service Update
Roads and 
Infrastructure – 
Mark Calder
Quarterly Report 8 November
2024  Page 192