Port Riddell
Condition Report and Initial
Option Development
June 2023
Page i of v

Page 2

This page left intentionally blank for pagination.
Page ii of v

Page 3

Page iii of v
Mott MacDonald
St Vincent Plaza
319 St Vincent Street
Glasgow G2 5LD
United Kingdom
T +44 (0)141 222 4500
mottmac.com
Argyll and Bute Council
Kilmory
Lochgilphead
Argyll
PA31 8RT
Mott MacDonald Limited. Registered in
England and Wales no. 1243967.
Registered office: Mott MacDonald House,
8-10 Sydenham Road, Croydon CR0 2EE,
United Kingdom
Port Riddell
Condition Report and Initial
Option Development
June 2023

Page 4

Mott MacDonald | Port Riddell Condition Report and Initial Option Development Page iv of v
Issue and Revision Record
Revision Date Originator Checker Approver Description
A 12.06.23 Graduate Project
Manager
Project Director For Client Comment
Document reference: A |
Information class: Standard
This document is issued for the party which commissioned it and for specific purposes connected with the above-
captioned project only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used
for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us
by other parties.
This document contains confidential information and proprietary intellectual property. It should not be shown to other
parties without consent from us and from the party which commissioned it.

Page 5

Mott MacDonald | Port Riddell Condition Report and Initial Option Development Page v of v
Contents
Executive Summary 1
1 Introduction 2
1.1 General 2
1.2 Background and Record Information 2
1.3 Description of the Structure 2
1.4 Scope of Inspection and Limitations 3
2 Condition Summary 4
2.1 Access Ramp 4
2.2 Parking Area 5
2.3 Slipway 6
2.4 Historic Bathing Area 7
2.5 Victorian Changing Rooms and Walkway 8
3 Option Development and Cost Estimates 9
3.1 Make Good Existing Structures 9
3.2 Widen Entrance and Provide Increased Turning Area 9
3.3 Extend and Widen Existing Slipway 9
3.4 Refurbish Existing Changing Rooms 10
3.5 Provision of Facilities Block 11
3.6 Cost Estimates 11
3.7 Next Steps 11
A. Overview Drawings for Information 12
B. Photographs 13

Page 6

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 1 of 20
Executive Summary
The facilities at Port Riddell, Dunoon, consist of a concrete slipway, adjacent parking area,
vehicular access ramp, dis-used Victorian changing rooms and pedestrian steps from the A815.
Limited information is known about the historic use of the structures and as-built records are not
available.
There are 9no. small Victorian changing rooms at Port Riddell, located below the A815
promenade. These have been closed for some time. It is believed that these changing rooms
accompanied a historic bathing area (public open air swimming pool / lido) that has since been
capped with a concrete slab.
Mott MacDonald were appointed by Stantec Ltd, on behalf of Argyll and Bute Council, to
undertake a topside walkover of Port Riddell to ascertain the general condition of the existing
structures and to provide potential engineering options and associated cost estimates for the
repair or future development of Port Riddell. Indicative plans for redevelopment have been
provided by Argyll and Bute Council for consideration. These plans improve access to the
waterfront and would facilitate use by small leisure craft, launching of kayaks or similar activities.
MML’s walkover found that the structures at Port Riddell require considerable repair for the
facilities to be brought back into use for launching leisure vessels and to improve waterfront
access.
Options for improving the infrastructure at Port Riddell were developed identified by Argyll and
Bute Council and have been further developed by Mott MacDonald. The access route and slipway
could be widened, and a facilities block could be provided either on the promenade or in the
location of the existing capped lido. The changing rooms could also be refurbished. This report
does not consider redevelopment or re-opening of the lido.
The key defects found were:
● Large areas of the vehicle approach and parking area concrete slab are dislodged, spalled or
missing,
● Cracks and open joints are visible along the parking area seaward and rear walls, and
● Changing rooms are in poor condition.
This report presents the following 5 options to repair or upgrade the facilities at Port Riddell:
Table 1.1: Summary of options and costs
Option Estimated CAPEX Range
1. Make good the existing structures £150,000 - £240,000
2. Provide adequate turning area for vehicles (includes Option 1) £270,000 - £440,000
3. Extend and widen the slipway (includes Option 1 and 2) £450,000 - £730,000
4. Refurbish the changing rooms (includes Option 1) £260,000 - £420,000
5. Provide a new facilities block (subject to size and facilities offered) £100,000 - £160,000
The preliminary cost estimates are based on experience of similar projects.

Page 7

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 2 of 20
1 Introduction
1.1 General
Mott MacDonald Ltd (MML) were appointed by Stantec Ltd, on behalf of Argyll & Bute Council
(A&BC), to undertake a visual walkover and condition assessment of the existing structures at
Port Riddell. MML have reviewed and further developed A&BC’s proposals and have produced
cost estimates for future development at Port Riddell.
The aim of the walkover was to visually assess the condition of the structures at Port Riddell and
was carried out on the 12th of April 2023 along with colleagues from Stantec and Argyll and Bute
Council.
This report details the following:
● Findings of MML’s site walkover, along with review of any existing information to better
understand the site history and current condition of the existing structures, and
● 5 no. potential development options and the anticipated capital costs.
1.2 Background and Record Information
There is limited information available regarding the history of the structures at Port Riddell and
as-built records, or records of repairs, are not available. The age of the infrastructure is unknown.
However, from a search on the Argyll and Bute Council website, a set of minutes from a Strategic
Policy Committee meeting in November 2003 confirms that Port Riddell would have been used
as a bathing area, to which the Victorian changing rooms would be associated.
A&BC advise the slipway has been previously used for the launching of small leisure craft.
The following appendices present supplementary information:
● Appendix A: A&BC’s overview drawings and potential future plans
● Appendix B: MML’s site photographs (2023)
1.3 Description of the Structure
Port Riddell is approximately 0.5 miles north of Dunoon Ferry Terminal, directly adjacent to the
A815. There is an approach ramp from the A815 that leads to a small parking area at the head of
a concrete slipway. Vehicle access is currently restricted at the entrance from the A815. Port
Riddell includes a historic bathing area, capped with a concrete slab and 9no. disused Victorian
changing rooms at the north-eastern extent of the site.
The above elements can be seen in Figure 1 below.

Page 8

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 3 of 20
Figure 1: Port Riddell Overview
More information on the current condition of the structures is provided in Section 2 of this report.
1.4 Scope of Inspection and Limitations
The scope of this inspection included a top-side walkover of the infrastructure at Port Riddell
around low tide. Structural assessments or intrusive surveys have not been undertaken.
The majority of the structures are within the ‘splash zone’ and their use may be subject to tidal
restrictions and ongoing maintenance to remove marine growth.
MML’s site walkover was limited to areas that are accessible by the public, noting the lido and
Victorian changing rooms are sealed with concrete blockwork and the internal condition of one
changing room only could be viewed via gaps in the concrete blocks.
This report does not consider redevelopment of the bathing area.
Victorian Changing Rooms
Concrete Slipway
Historic Bathing Area
Parking Area
Access Ramp from A815

Page 9

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 4 of 20
2 Condition Summary
This section provides a summary of the condition of the structures at Port Riddell as informed
MML’s walkover.
2.1 Access Ramp
The access ramp is approximately 7.2m wide and 30m long. Vehicular access to the ramp is
currently restricted by a traffic bollard and the route passes over the public promenade, as shown
in the photograph in Appendix B.1. The entrance to the access ramp from the A815 is narrowed
by low-level brick walls, also shown in the photo in Appendix B.1.
Figure 2: Approach Ramp and Parking Area
There is a small set of steps approximately 10m from the head of the access ramp, with railings
either side. These steps narrow the width of the access ramp by approximately 2m and would
prohibit two-way traffic on the ramp.
There is handrailing on the seaward side of the access ramp that terminates approximately 2m
from of the base of the ramp.
The vertical wall to the seaward side of the access ramp is protected by rock armour at the toe of
the structure, and then by a section of formal revetment with stone pitching at the base of the
ramp, as can be seen in the photograph in Appendix B.2. The pitching appears to be in fair
condition; however, mortar loss is observed between the paving stones and the toe of the
revetment is some distance above the beach level; this may be due to a number of reasons
including: seasonal or storm related beach mobility, local scour around the manmade hard
structures etc.
The structural form of the vertical wall is unknown. It could be masonry with a protective facing –
with cracks following the bedding joints. Alternatively, the cracks could be associated with cold
joints as concrete was placed in layers.

Page 10

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 5 of 20
2.2 Parking Area
The parking area at the head of the slipway is approximately 7.2m wide x 30m long and comprises
a concrete slab that is raised approximately 1 – 1.5m above the current beach level. There is
scattered rock armour placed in front of the parking area, as can be seen below and in the
photographs in Appendix B.2 and B.4.
The concrete slab to the parking area is in poor condition with large areas of broken and dislodged
concrete, rebar exposed and cracking of the concrete visible. These defects are observed over
the majority of the surface and can be seen in Appendices B.2 and B.3.
At the beach, the seaward face of the concrete structure does not appear to be undermined;
however, cracks, spalled concrete and voids are observed on the vertical face. The joint between
the seaward face of the wall and the concrete slab to the parking area has widened over time,
allowing seawater below the slab, potentially worsening the condition of the structure. This can
be seen in the photograph in Appendix B.3.
To the rear of the parking area, there is a concrete wall, approximately 2.5 – 3.0m high, which
retains the public promenade. This wall has various horizontal cracks along its length, with small
areas of concrete spalling around the cracks, this can be seen in the photograph in Appendix B.5.
This rear wall is also within the splash zone, with potential corrosion of any reinforcement within
the concrete; however, this was not visible during MML’s walkover.
There is a drainage pipe, assumed to be a surface drainage pipe from the promenade above, that
discharges directly onto the parking area, also shown in the photograph in Appendix B.5.
There is a further set of steps leading to the promenade from the north-east corner of the parking
area, these steps are also at the head of the concrete slipway and can be seen in Figure 5.
Figure 3: View of Parking Area and Access Ramp from Slipway

Page 11

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 6 of 20
2.3 Slipway
The concrete slipway has an apron extending from the parking area / in front of the historic bathing
area. The apron is approximately 23.5m wide at the top and narrows to 3.5m along the main
section of the slipway. The length of the slipway is unknown, and the toe of the slipway was not
visible during MML’s site walkover.
Figure 4: Concrete Slipway
Anecdotally, A&BC advise that the current slipway gradient is acceptable, however the slipway is
currently too narrow and abruptly ends, therefore it is considered unsafe to launch/recover small
craft.
The joint between the slipway apron and the parking area has widened, with voids visible in the
wall at the corner of the apron, show in the photograph in Appendix B.3.
The slipway appears in fair condition with no undermining of the structure visible on either side of
the slipway or the apron during MML’s walkover.

Page 12

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 7 of 20
2.4 Historic Bathing Area
The parking area is bound to the east by the historic concrete bathing area / lido. The bathing
area has been capped with a concrete slab, and potentially infilled. This can be seen below and
in the photograph in Appendix B.6.
Figure 5: Historic Bathing Area
There are cracks present around the bathing area walls, some of which are potentially joints that
have widened over time. Similar to the vertical wall at the access ramp, the structural form is
unknown and could be masonry with a protective facing – with cracks following the bedding joints.
Alternatively, the cracks could be associated with cold joints as concrete was placed in layers.
There are also some gaps in the seaward wall of the bathing area that have been filled with what
is assumed to be timber. It is assumed that these were originally associated with water
inlets/drainage infrastructure from the bathing area.
There are two drainage outfalls that discharge directly onto the concrete cap of the bathing area.
This discharge then flows over the bathing area and down onto the walkway towards the Victorian
changing rooms, leading to an accumulation of algae/marine growth at the top of the steps to the
beach. This is shown in the photograph in Appendix B.11. This is noted as a health and safety
hazard as the algae/marine growth is extremely slippery and makes the steps unsafe for use.

Page 13

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 8 of 20
2.5 Victorian Changing Rooms and Walkway
To the north of the historic bathing area, there are 9no. disused Victorian changing rooms which
can be accessed via a 0.7m wide walkway. The changing rooms are directly below the public
promenade retained by the seawall. Anecdotal evidence from A&BC confirms use of the changing
rooms would be tidally restricted. The walkway is approximately 0.8m above the beach level and
a set of steps beside the bathing area leads from the walkway down to the beach. There are no
handrails present.
Figure 4: Victorian Changing Rooms and Walkway
The changing rooms are currently not in use and are blocked off with lightweight concrete blocks,
therefore the condition of each of the changing rooms is unknown. However, the top row of blocks
at changing room 1 is missing and the internal space could be viewed using a camera, as shown
in photograph in Appendix B.12. Changing room 1 is approximately 1.5m wide x 1.9m high x 2.5m
deep. The walls and ceiling of changing room 1 appear in fair condition; however, a render or
painted surface has been used on the surfaces, therefore the condition of the blocks making up
the structural wall is unclear.
The exposed edge of the concrete roof slab above the changing rooms varies in condition along
the length. There are sections with spalling concrete, large cracks and portions missing, as shown
in the photograph in Appendix B.10.
The walkway in front of the changing rooms appears in good condition with the exception of the
corner nearest the steps down to the beach. This section appears to be undermined where the
steps meet the wall and voids are present here. The voids were not measured due to the presence
of large amounts of algae and seaweed on the steps making them unsafe. This is shown in the
photographs in Appendix B.10 and B.11.

Page 14

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 9 of 20
3 Option Development and Cost Estimates
This section presents development options that Argyll and Bute Council have asked to be
explored in relation to the redevelopment of Port Riddell. Preliminary cost estimates for each
option are presented in Section 3.6.
Some of the development options should not be considered in isolation. These are noted
accordingly.
3.1 Make Good Existing Structures
The first option would be to make good the existing structures, including:
● Repair the parking area slab,
● Repair the parking area rear wall,
● Repair the parking area seaward wall,
● Repair the corner of the walkway wall at the beach access steps, and
● Replace the missing blocks at the changing rooms to block them off.
This option would bring the structures at Port Riddell back into a good condition. However, it does
not address safety concerns over the existing width and sudden termination of the slipway. The
bathing area and Victorian changing rooms would remain closed.
3.2 Widen Entrance and Provide Increased Turning Area
The second option could be to improve vehicular access from the A815 to the slipway, and
therefore includes all elements in Option 1, plus:
● Widen the entrance to the site from the A815 to allow for a two-way junction,
● Remove set of steps near the top of the access ramp,
● Remove rock armour in front of historic bathing area,
● Repair parking area structure (deck slabs, seaward and rear walls),
● Remove historic bathing area concrete cap and lido structure,
● Provide new concrete deck below historic bathing area, and
● Reinstate rock armour in front of parking area.
Again, this option does not address safety concerns over the existing width and sudden
termination of the slipway. The bathing area and Victorian changing rooms would remain closed.
3.3 Extend and Widen Existing Slipway
This option would require the provision of an adequate turning area and therefore includes all
elements in Options 1 and 2, plus:
● Widen the existing slipway by 1.5m, and
● Extend the existing slipway by 5.0m.
This would allow for vehicles to bring leisure craft on trailers to Port Riddell and launch them from
the slipway. The removal of the historic bathing area would provide a ‘T-head’ area of
approximately 30m long in which vehicles could facilitate turning at the top of the slipway.

Page 15

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 10 of 20
3.4 Refurbish Existing Changing Rooms
This option could be undertaken either in conjunction with the above options, or separately;
however, the existing structures would require to be made good (Option 1), so they are safe for
public access. This option would require:
● Make good existing structures to eliminate any health and safety risks (parking area deck and
seaward and rear walls),
● Removal of concrete blockwork to open the changing rooms,
● Removal of beach access steps,
● Reclamation of approximately 0.5m of land to the seaward side of the walkway to increase
width to 1.2m,
● Removal of step at changing rooms and reprofile to provide EA compliant access,
● Construction of new beach access ramp,
● Installation of a handrail round the walkway from the bathing area and along in front of the
walkway in front of the changing rooms,
● Repairs to the concrete exposed edge of the roof slab above the changing rooms,
● Repairs to the internals of the changing rooms (floors, walls and ceilings), and
● Refurbishment of the changing rooms (provision of doors, drainage, painting / tiling, etc.).
This option would allow for the changing rooms to be used by swimmers, kayakers, etc. However,
the changing rooms would require locks or a form of security in order to prevent misuse or
vandalism. The changing rooms would require adequate drainage to ensure that any water from
swell / waves does not collect inside the changing rooms. The existing changing rooms height is
1.9m which may decrease further depending on the repairs required. M&E upgrades have not
been considered.
MML have experience of developing proposals for beach huts and chalets as part of other
seafront development projects and masterplans. Key features of these proposals highlighted the
importance of resilience, security, accessibility, and drainage. Recent examples are shown below:
Figure 5: MML’s example beach chalet project

Page 16

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 11 of 20
3.5 Provision of Facilities Block
A final addition to Port Riddell could be a ‘facilities block’ with a connection to existing services
that would provide toilets and cold-water showers. There are various locations in which the
facilities block could be positioned: the bathing area could be removed, and the block positioned
there, or the facilities block could be located at road level through the removal of a section of the
existing on-street parking.
If the facilities block were to be provided at road level, this may impact on the views of those who
reside on the opposite side of the A815. However, the facilities block would likely be within the
splash zone if located where the historic bathing area is positioned; this would increase the cost
of the building and would result in an increased maintenance burden given increased exposure
to waves etc. and the high levels of corrosion experienced in this area.
There are a number of options for provision of a facilities block, including:
 Modular building at street level,
 Permanent building at street level, or
 Permanent building at slipway level (not recommended for the reasons described above).
3.6 Cost Estimates
Preliminary cost estimates for the five repair / development options are based on experience of
similar projects including feedback on previous cost estimates. The table below summarises the
estimated capital costs associated with each of the options above.
Option Estimated CAPEX Range
1. Make good the existing structures £150,000 - £240,000
2. Provide adequate turning area for vehicles (includes Option 1) £270,000 - £440,000
3. Extend and widen the slipway (includes Option 1 and 2) £450,000 - £730,000
4. Refurbish the changing rooms (includes Option 1) £260,000 - £420,000
5. Provide a new facilities block (subject to size and facilities offered) £100,000 - £160,000
3.7 Next Steps
MML advise the next steps would include further liaison with potential users and the public and
rationalisation of the options to agree what features should be included in the preferred option.

Page 17

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 12 of 20
A. Overview Drawings for Information

Page 18

3.5m wide slipway
remains of groin
700mm wide walkway outside changing
room recesses under promenade
brick planters
main level
promenade level
footpath to parkingroadway level
concrete mass
main stair
second stair
vehicle access with centre bollard
stair down to beach
A-A
0201
Title
Scale at A3
RevStatusDrawing Number
Client
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.
Suit. Code
MMD Project No.
Security
Suitability Description
App'dCh'k'dDescriptionDrawnDateRev
Seq. Number
P1
14/04/2023 16:27:26 C:\BIM\Dunoon.rte
1 : 500
St Vincent Plaza
319 St Vincent St
Glasgow, G2 5LP
United Kingdom
T    +44 (0)141 222 4500
F    +44 (0)141 221 2048
W    www.mottmac.com
100401059
S0
Suitable for Review & Comment
Client Name Port Riddell Slipway
Client Line 1
Client Line 2
Client Line 3
PRE
Client Line 4
MMDL-MMD-00-XX-DR-A-0201 STD
SHEET 1
ARCHITECTURAL
STANDARD NOTES
Layout
14/04/2023
DRAFT SUITABLE FOR
INFORMATION
000
.1 : 500
Site Layout
.
3D View
P1 14.04.23 DR PRELIMINARY ISSUE FOR INFO
.1 : 500
Section A-A

Page 19

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 13 of 20
B. Photographs

Page 20

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 14 of 20
Figure B 1: Entrance from A815
Figure B 2: Paved revetment and access ramp

Page 21

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 15 of 20
Figure B.3: View of broken deck slabs at parking area, joint with head of slipway
Figure B.4: Rock armour in front of parking area

Page 22

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 16 of 20
Figure B.5: Wall to the rear of the parking area
Figure B.6: View of capped bathing area from above

Page 23

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 17 of 20
Figure B.7: Concrete slipway from parking area
Figure B.8: View of slipway from in front of bathing area

Page 24

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 18 of 20
Figure B.9: Walkway around bathing area towards Victorian changing rooms
Figure B.10: Walkway in front of Victorian changing rooms

Page 25

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 19 of 20
Figure B.11: Steps down to beach in front of Victorian changing rooms
Figure App B.12: Inside of changing room 1

Page 26

Mott MacDonald | Port Riddell Condition Report and Initial Option Development
A | June 2023
Page 20 of 20