Page 1

Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 605522
DX 599700 LOCHGILPHEAD 
10 December 2025 
NOTICE OF MEETING 
A meeting of the PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE will be
held BY MICROSOFT TEAMS on WEDNESDAY, 17 DECEMBER 2025 at 10:30 AM, which you
are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. MINUTE (Pages 3 - 16)  
Planning, Protective Services and Licensing Committee held on 18 November 2025 
4. MACLEOD CONSTRUCTION LTD: ERECTION OF 8 DWELLINGHOUSES AND
FORMATION OF VEHICULAR ACCESS: LAND EAST OF KNOCK FARMHOUSE,
UPPER LOCHGAIR (REF: 22/00680/PP) (Pages 17 - 52)  
Report by Head of Development and Economic Growth 
5. MOWI SCOTLAND: REPLACE EXISTING 10 X 120M CIRCUMFERENCE PENS
WITH 6 X 160M CIRCUMFERENCE PENS (WITH A PARALLEL MINOR
RELOCATION INTO DEEPER WATER MOVING THE CARRADALE SOUTH SITE
CENTRE 99M EAST) AND SITING OF EXISTING FEED BARGE IN A DIFFERENT
LOCATION: CARRADALE SOUTH FISH FARM, KILBRANNAN SOUND (REF:
24/01381/MFF) (Pages 53 - 94)  
Report by Head of Development and Economic Growth 
6. MOWI SCOTLAND: REPLACE EXISTING 10 X 120M CIRCUMFERENCE PENS
WITH 6 X 160M CIRCUMFERENCE PENS (WITH A PARALLEL MINOR
RELOCATION INTO DEEPER WATER MOVING THE CARRADALE NORTH SITE
CENTRE 79M EAST) AND SITING OF EXISTING FEED BARGE IN A DIFFERENT
LOCATION: CARRADALE NORTH FISH FARM, KILBRANNAN SOUND (REF:
24/01382/MFF) (Pages 95 - 136)  
Report by Head of Development and Economic Growth
Public Document Pack

Page 2

7. JOINT PUBLIC HEALTH PROTECTION PLAN 2025-2027 (Pages 137 - 202)  
Report by Executive Director with responsibility for Regulatory Services 
REPORTS FOR NOTING 
8. UPDATE ON RECENT TAYNUILT BESS APPEAL (Pages 203 - 208)  
Report by Head of Development and Economic Growth 
9. LOCAL DEVELOPMENT PLAN 3 - EVIDENCE REPORT STAGE ENGAGEMENT
(Pages 209 - 214)  
Report by Executive Director with responsibility for Development and Economic
Growth 
Planning, Protective Services and Licensing Committee 
Councillor John Armour Councillor Gordon Blair (Chair)
Councillor Jan Brown Councillor Audrey Forrest
Councillor Kieron Green (Vice-Chair) Councillor Amanda Hampsey
Councillor Daniel Hampsey Councillor Graham Hardie
Councillor Fiona Howard Councillor Mark Irvine
Councillor Andrew Kain Councillor Paul Donald Kennedy
Councillor Liz McCabe Councillor Dougie Philand
Councillor Peter Wallace   
Contact: Fiona McCallum                  Tel. No. 01546 604392

Page 3

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING
COMMITTEE held BY MICROSOFT TEAMS on TUESDAY, 18 NOVEMBER 2025 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Jan Brown
Councillor Audrey Forrest
Councillor Graham Hardie
Councillor Fiona Howard 
Councillor Andrew Kain
Councillor Paul Donald Kennedy
Councillor Dougie Philand
Councillor Peter Wallace 
Attending: Fergus Murray, Head of Development and Economic Growth
Shona Baron, Governance Manager
Peter Bain Development Manager
Kirsty Sweeney, Area Team Leader – Helensburgh & Lomond/Bute &
Cowal)
Tim Williams, Area Team Leader – Oban, Lorn and the Isles
Emma Jane, Planning Officer
Emma Shaw, Planning Officer
Lorna Pearce, Senior Development Officer
Kim de Buiteléir, Senior Planning and Strategies Officer 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Gordon Blair, Amanda Hampsey,
Daniel Hampsey and Mark Irvine. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. MINUTES 
a) The Minute of the Planning, Protective Services and Licensing Committee held on 22
October 2025 at 11.00 am was approved as a correct record. 
b) The Minute of the Planning, Protective Services and Licensing Committee held on 22
October 2025 at 2.30 pm was approved as a correct record. 
c) The Minute of the Planning, Protective Services and Licensing Committee held on 22
October 2025 at 3.30 pm was approved as a correct record. 
4. THE SCOTTISH GOVERNMENT: SECTION 36 CONSULTATION FOR WIND
FARM CONSISTING OF 9 TURBINES EACH WITH A MAXIMUM BLADE
TIP HEIGHT OF UP TO 180 METRES.  GENERATING CAPACITY WILL BE
MORE THAN 50MW: KILLEAN ESTATE, NEAR TAYINLOAN (REF:
24/01541/S36) 
The Development Manager spoke to the terms of supplementary report number 1 which
summarised the decision taken by the PPSL Committee on 22 October 2025 to submit a
holding objection in respect of this application.  The Energy Consents Unit were notified of
this and were advised that matters would be considered further by the Committee at this
meeting to agree a final response to the ECU.
Page 3 Agenda Item 3

Page 4

Decision 
The Committee agreed to object to this proposal for the following reasons and that the
Energy Consents Unit be notified accordingly: 
Argyll and Bute Council objects to the application on the basis of NPF 4 policies 4a and 11
Section E, Paragraphs 2, 3, 4 and 13 and LDP2 Policy 30 on the basis that the application
would have a cumulative, significant and unacceptable adverse impact in respect of
landscape, visual and cumulative matters. 
The current application comprises 9 wind turbines up to 180m high to blade tip. The
majority of the proposed wind turbines are located within a conifer plantation with three
wind turbines lying in more open ground close to the woodland edge. A previous
application for a wind farm on the location was refused planning permission. 
In the Landscape Experts report it is stated – ‘The Landscape and Visual Impact
Assessment (LVIA) finds that significant effects would arise on the character of the Upland
Forest Moor Mosaic LCT within which the proposed wind farm would be sited. The
Members  agree with this finding and with the judgement that these effects would extend
up to around 6km or so from the wind farm’. 
It also confirms that the Landscape Expert is of the opinion that the wind farm would incur
significant adverse effects on the Coastal Plain LCT which forms a triangular and flat area
of farmland, woodland and moor extending west to Rhunahaorine Point. This is a
relatively small LCT and effects would be widespread. The expert also disagreed with the
judgement made in the LVIA with regard to effects on the character of the Coastal Parallel
Ridges LCT which covers the whole of the island of Gigha. Gigha lies less than 3km from
the west coast of the Kintyre peninsula at its closest point across the narrow Sound of
Gigha. The very large turbines of this proposal would be prominent in views from Gigha
and from the Sound of Gigha and I consider that significant adverse effects would occur
on the sense of remoteness and naturalness associated with the island and the immediate
waters surrounding the island. 
While Members agree with the Landscape Expert’s opinion that this development will
cause a significant adverse impact on the landscape character the Members disagree with
the recommendation not to object to the application for the following reasons. 
The landscape expert lists the following as all significant adverse effects - 
The Significant Adverse effects are not limited to the local area but cover a large area to
the west and in particular, within 1.7km of the West Kintyre Coast Local Landscape Area
(LLA)’  ‘and it principally comprises settled and more intricately patterned coastal fringes
with key special qualities likely to comprise a diverse landform and landcover pattern and
views along the coast and out to sea to the west to Gigha, Islay and Jura.’ 
Members also agree with the landscape expert’s advice that ‘  that there would be
significant adverse effects on some of the key qualities of this LLA’ 
The landscape expert also states that – ‘The location of the proposed development on
west-facing outer slopes of the Kintyre peninsula would increase visibility from the sea,
coast and Gigha. I consider that significant adverse effects on views would principally
occur from the following locations:
Page 4

Page 5

The Kintyre Way - where the proposed development would be seen at close quarters as
the route is aligned through the development site. 
The Sound of Gigha and Gigha. - The proposed wind farm would be visible across much
of Gigha and the Sound of Gigha. 
The west Kintyre coast. - There would be extensive visibility of the proposal from the
predominantly open Coastal Plain. 
Knapdale - There would be visibility of the proposed wind farm from the southern part of
the Knapdale peninsula with this likely to be restricted to more open coastal locations due
to the extensive woodland present. 
The Islay Ferry - Similar to the account of views from Knapdale above. 
The landscape expert says that – ‘Changes have occurred to national planning policy
since the 2019 Conjoined Killean and Clachaig Glen Wind Farms PLI. NPF4 Policy 11(e)
(ii)( states that significant landscape and visual impacts are to be expected for some forms
of renewable energy and where impacts are localised and/or appropriate design mitigation
has been applied, they will generally be considered to be acceptable. NPF4 provides no
guidance on the definition of what constitutes ‘localised’ effects. The Killean proposal
would have significant adverse effects on landscape and coastal character and on the
character of the island of Gigha. Significant adverse effects on views will principally occur
from Gigha Sound, from the settled eastern coast and small spine of hills on Gigha, the
Kintyre Way and the Rhunahaorine Point/Point Sands area’ 
Members of the Planning Committee submit that this is not a localised issue as the visual
impact will cover an area larger than 9km and as such is contrary to NPF4 Policy 11(e)(ii). 
The landscape expert goes on- ‘Changes to national planning policy and the consent of
the Clachaig Glen II wind farm have a bearing on the decision to be made on the
acceptability of this proposal in terms of its landscape and visual effects. While I consider
that the effects of this proposal on its own could be termed more than local in extent
because of the significant effects on landscape/coastal character and on views from Gigha
and the Sound of Gigha that would arise (lying up to 9km distance), the likely construction
of the Clachaig Glen II wind farm would moderate these effects.  I therefore recommend
that no objection should be raised in respect of landscape and visual interests’. 
Members understand the argument put forward by the Landscape Architect but do not
accept that the construction of the Clachaig Glen II windfarm would moderate and as such
mitigate the significant impact of this development on the landscape character and visual
amenity. 
‘Cumulative landscape and visual effects would principally arise between the consented
Clachaig Glen II wind farm and this proposal. As there is a strong likelihood that the
consented Clachaig Glen II scheme will be constructed, it is important that the Killean
proposal is not considered in isolation. In many key views, for example from Point Sands
(VP4) and from Gigha (VPs 6 and 8), the Killean proposal will appear as an extension to
Clachaig Glen II wind farm, exacerbating significant adverse effects, for example, in terms
of increasing the extent of turbines seen on skylines looking east but not being the first to
introduce new much larger and more prominent wind turbines to the scene. Put simply,
the consent of Clachaig Glen II will already incur significant adverse effects on key views
Page 5

Page 6

from Gigha, Gigha Sound and part of the west Kintyre coast and this will reduce
landscape and visual sensitivity and the magnitude of change likely to occur should the
nine turbines of the Killean proposal be added in a similar location.’ 
Again, Members understand the argument put forward by the Landscape Architect but do
not accept that the construction of the Clachaig Glen II windfarm would moderate and as
such mitigate the significant cumulative impact of this development on the landscape
character and visual amenity. 
We the Planning Committee disagree with this recommendation not to object on the
grounds that the cumulative effect of the two combined wind farms will incur significant
adverse effects on key views from Gigha, Gigha Sound and the Kintyre Coast contrary to
the above noted development plan policies.  In addition, visible aviation lighting would
increase the duration of these adverse effects on views. 
(Reference: Report by Head of Development and Economic Growth dated 6 October 2025
and Supplementary Report Number 1 dated 4 November 2025, submitted) 
5. MR KYLE KENNEDY: ERECTION OF DWELLINGHOUSE, FORMATION OF
VEHICULAR ACCESS AND ASSOCIATED WORKS: LAND BETWEEN
LAGARIE LODGE AND LAGARIE HOUSE, TORWOODHILL ROAD, RHU
(REF: 25/00576/PP) 
The Planning Officer spoke to the terms of the report and to supplementary report number
1 which advised of additional representations received since publication of the main report
including a late objection from Rhu and Shandon Community Council.  Reference was
also made to late representations received from Councillor Maurice Corry and Mr Jim
Crawford, which were circulated to the Committee. 
The site is located within the settlement area of Rhu and lies within the Rhu Conservation
Area and the residential property adjacent to the West “Lagarie House” which is a
Category “B” listed building.  Also within the vicinity is the Category “A” listed “Ardencaple
Hotel”. 
The site is covered by a Tree Preservation Order, however, the site is not located within or
in proximity of any nature conservation sites, nor does it lie within NatureScot Ancient
Woodland Inventory. 
In 2023, a planning application (reference 23/01502/PP) for a single dwelling with
proposed access from the A814 was submitted along with an accompanying listed
building consent application in relation to the formation of the vehicular access through the
listed wall (reference 20/0183/LIB).  These applications were both approved on 23 May
2024 and remain extant consents.  Approval of this planning application for a single
dwelling on this application site accepts the principle of development for a single dwelling
on this site. 
Objections have been received from 19 third party representatives.  Officers are not
recommending a pre-determination hearing as it is considered that there would be no
added value as all material considerations have been taken into account within the report,
including consultee responses, third party representations and planning history. 
The proposal is considered to be consistent with the relevant provisions of the
Development Plan and there are no other material considerations of sufficient significance
Page 6

Page 7

to indicate that it would be appropriate to withhold planning permission having regard to
Section 25 of the Act. 
It was recommended that planning permission be granted subject to the conditions and
reasons detailed in the report of handling. 
Decision 
The Committee agreed to grant planning permission subject to the following conditions
and reasons: 
Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 07.04.25; supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
The development shall be implemented in accordance with the details specified on the
application form dated 07.04.25; supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan 1 of 13 A 9th April 2025
Site Plan as
Existing
2 of 13 - 8th April 2025
Site Sections A-A
+ B-B as existing
3 of 13 A 5th September
2025
Site Sections C-
C + D-D as
existing
4 of 13 A 5th September
2025
Site Plan as
proposed
5 of 13 A 5th September
2025
Site Sections A-A
+ B-B as
proposed
6 of 13 A 5th September
2025
Site Sections C-
C + D-D as
proposed
7 of 13 A 5th September
2025
Ground Floor
Plan as proposed
8 of 13  A 5th September
2025
South West
Elevation
9 of 13 A 5th September
2025
Page 7

Page 8

North East
Elevation as
proposed
10 of 13 - 5th September
2025
South East
Elevation as
proposed
11 of 13 - 5th September
2025
North West
Elevation as
proposed
12 of 13 A 5th September
2025
Roof Plan as
proposed 
13 of 13 A 7th November
2025 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. Scottish Water – Notwithstanding Condition 1, Prior to the commencement of
development, the developer shall submit written evidence to the Planning Authority
that an agreement with Scottish Water is in place for the connection of the proposed
development to the public water supply and wastewater sewage network. 
Reason: In the interests of public health and to ensure the availability of an adequate
water supply to serve the proposed development. 
3. Sustainable Urban Drainage – Notwithstanding Condition 1, details of a sustainable
urban drainage system compliant with the guidance set out in CIRIA’s SuDS Manual
C753 must be submitted to and approved in writing by the planning authority prior to
the commencement of development. The surface water drainage shall be operational
prior to the development being brought into use and shall be maintained as such
thereafter. 
Reason: To ensure adequate surface water drainage is implemented to prevent
flooding elsewhere. 
4. Landscape - Notwithstanding Condition 1, Prior to the commencement of
development, full details of both hard and soft landscape works to be carried out at the
site shall be submitted to and approved in writing by the local planning authority in the
form of a detailed landscaping plan. The approved hard landscaping works shall be
carried out prior to first occupation of the development and the soft landscaping works /
replacement tree planting within the first planting season following first occupation of
the development. The details submitted shall include: 
- details of the proposed hard surfacing (including proposed materials);
- details of proposed boundary treatments; 
- details of proposed soft landscaping;
- details of the replacement tree planting (location, size and species); 
- programme for completion and subsequent on-going maintenance. 
Reason: In the interests of biodiversity and the natural environment. 
5. Biodiversity Enhancement - Notwithstanding Condition 1, Prior to the
commencement of development, a revised biodiversity statement based on the
Preliminary Ecological Assessment table 6  shall be submitted to and approved in
writing by the Planning Authority. The statement shall demonstrate how the proposal
Page 8

Page 9

will contribute to conservation/restoration/enhancement of biodiversity, and how these
benefits will be implemented and maintained for the lifetime of the development. 
All physical biodiversity enhancement measures (bird nesting boxes, ‘swift bricks’,
wildlife ponds, bat and insect boxes, hedgehog homes etc) as set out in the
Preliminary Ecological Assessment table 6 and also include the retention of any felled
native species as deadwood shall be implemented in full before the development
hereby approved is first brought into use. 
All biodiversity enhancement measures consisting of new or enhanced planting shall
be undertaken either in accordance with the approved scheme of implementation or
within the next available planting season following the development first being brought
into use. 
Reason: To comply with the requirements of NPF4 Policy 3 and the recommendations
of the council biodiversity officer. 
6. Trees – Notwithstanding Condition 1, Prior to the commencement of development, a
tree protection plan shall be submitted to and approved in writing by the authority.
Thereafter, all retained trees on site shall be protected at all times during construction
in accordance with the British Standard; BS 5837:2012 (Trees in relation to design,
demolition and construction – Recommendations). 
Reason: The landscape features to be protected are important to the appearance and
character of the site and the surrounding area and are required to successfully
integrate the proposal with its surroundings. 
7. Pre-works checks - Notwithstanding Condition 1, Prior to the commencement of
development, pre-works checks for the presence of bats, breeding birds, hibernating
hedgehogs and amphibians on site; shall be carried out by an appropriately qualified
person. In circumstances where species of interest are identified as being present, or
at risk from construction works, a statement shall be submitted to and approved by the
authority in writing to provide suggested avoidance and or mitigation measures,
including timing constraints, to address such presence or risk. 
Reason: In order to establish that the circumstances of the site have not changed
significantly between approval and implementation of the development for the purpose
of protecting natural heritage assets in the interest of nature conservation. 
8. Invasive Non-Native Species Eradication Plan - Notwithstanding Condition 1, Prior
to the commencement of development, a non-native species eradication plan (in
accordance with the ‘Code of Practice with regard to non-native species;
http://www.scotland.gov.uk/Publications/2012/08/7367/0’) for the non-native species
present on site shall be submitted to and approved in writing by the authority. 
Reason: In the interest of nature conservation. 
9. External Materials - Notwithstanding Condition 1, Prior to the commencement of
development, samples of the proposed materials to be used for the external finishes of
the development hereby approved shall be submitted to and approved in writing by the
Planning Authority. 
Page 9

Page 10

Reason: In the interests of visual amenity and in order to integrate the proposal with its
surroundings. 
10. Sustainable Design – Notwithstanding Condition 1, Prior to the commencement of
development, details of the on-site micro renewable energy to provide heat or
electricity to the property and details of the use of the final materials – including details
of any re-cycled materials or local sourced materials and their embodied energy for
each materials, shall first be submitted and approved in writing by the Local Planning
Authority. Thereafter the approved micro renewables and materials must be used in
the development hereby approved. 
Reason: In order to ensure compliance with LDP2 Policy 09 and to ensure the building
is being as energy efficient as possible in order to respond to climate change. 
11. Quality homes – Notwithstanding Condition 1, Prior to the commencement of
development, details of the proposed timescale for completion of the approved
development have been submitted to and approved by the Planning Authority.
Thereafter, the development shall be implemented in accordance with the duly
approved timescale for completion unless an alternative timescale for completion is
otherwise agreed in writing with the Planning Authority. 
Reason: In order to comply with the requirements of NPF4 Policy 16F. 
12. Potential sources of nuisance – Notwithstanding Condition 1, Prior to the
commencement of development, identification and assessment of all potential sources
of nuisance, including noise/ vibration, dust, and any temporary lighting provided,
which may cause disturbance to nearby residents during the demolition / construction
process shall be undertaken by the applicant. This should include consideration of
intended hours of operation, movement of vehicles, use of plant and storage of
equipment and materials on site. 
For all potential sources of nuisance, the applicant will be required to provide a
management plan with details of suitable control measures to be put in place so as to
ensure that construction does not cause loss of amenity to local residents and/or
statutory nuisance. The management plan must be submitted to and approved by the
Planning Authority and thereafter complied with. 
Reason: In order to avoid sources of nuisance in the interest of amenity. 
13. Parking and Turning – Notwithstanding Condition 1, The parking and turning area
shall be laid out in accordance with the details shown on the approved  drawing
reference; 00-003 REV. A prior to the development first being occupied and shall
thereafter be maintained clear of obstruction for the parking and manoeuvring of
vehicles. 
Reason: In the interest of road safety. 
14. Junction with public road - Notwithstanding Condition 1, the proposed access shall
be formed in accordance with the Council’s Roads Standard Detail Drawing SD 08/005
Rev. B (as laid out on approved drawing reference; 00-003 REV. A) incorporating
vehicular visibility splays of 75 x 2.4 x 1.05 metres measured from the edge of the
carriageway and pedestrian visibility splays of 2.4 m x 2.4 x 0.9 metres measured from
the rear of the footway. Thereafter the driveway shall be formed in accordance with the
Page 10

Page 11

Council’s Roads Standard Detail Drawing SD 08/002 Rev. B, providing a minimum
driveway access width of 5.5m for the first 10m, reducing to no less than 3.7m
thereafter (3.5m where not bound by walls). The access shall be surfaced with a bound
material for the first 5m. Gradients of the access drive must be no greater than 5%
over the first 5.0m and thereafter must not exceed 12.5%. Drainage shall be achieved
within the boundary such that no water shall discharge onto the public carriageway.
Prior to the commencement of development the access hereby approved shall be
formed to at least base course standard and the visibility splays shall be cleared of all
obstructions such that nothing shall disrupt the required visibility spays. The final
wearing surface on the access shall be completed prior to the development first being
occupied and the visibility splays shall thereafter be maintained clear of all obstructions
in perpetuity. 
Reason: In the interests of road safety. 
Having moved an Amendment which failed to find a seconder, Councillor Fiona Howard
asked for her dissent from the foregoing decision to the be recorded. 
(Reference: Report by Head of Development and Economic Growth dated 11 November
2025, Supplementary Report Number 1 dated 17 November 2025, submitted and late
representations received by email, tabled) 
6. MR GAETANO GRIEVE: ERECTION OF 4 DWELLINGS, INSTALLATION
OF SEWAGE TREATMENT PLANTS AND FORMATION OF 2 VEHICULAR
ACCESSES: LAND WEST OF KOMANI AROS MAINS, AROS, ISLE OF
MULL (REF: 25/01248/PP) 
The Planning Officer spoke to the terms of the report.  In terms of the adopted Local
Development Plan 2 (LDP2), the site is identified as ‘Outwith Settlement Areas’ within an
area defined as ‘Countryside Area’ where Policy 02 of LDP2 gives a presumption in favour
of sustainable development where it is of an appropriate scale, design, siting and use for
its countryside location, as set out in the relevant sustainable siting and design policies of
LDP2. 
A previous application was submitted for the development of the site with six
dwellinghouses and associated works.  This application was subsequently withdrawn
following concerns raised by the Planning Authority with regard to the density and siting of
the proposed development.  The current application proposes an amended scheme,
seeking to address the previous concerns. 
The proposal has elicited 27 objections, 1 representation and 2 expressions of support. 
There have been no objections from statutory consultees.  Most of the objections relate
largely to existing water supplies, the suitability of the access to serve the proposed
development, and the visual impact resulting from the proposed development.  The
application site is not covered by any specific environmental or landscape designations
and the Officer’s recommendation is aligned with the consultation responses received
from both the Council’s Roads Authority and Scottish Water and as such it is not
considered that a pre-determination hearing would add significant value to the decision
making process. 
The proposal is considered to be consistent with the relevant provisions of the
Development Plan, and there are no other material considerations of sufficient
Page 11

Page 12

significance, including issues raised by third parties, to indicate that it would be
appropriate to withhold planning permission having regard to Section 25 of the Act. 
It was recommended that planning permission be granted subject to the conditions and
reasons detailed in the report. 
Decision 
The Committee agreed to grant planning permission subject to the following conditions
and reasons: 
Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 22.07.2025, supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan 677_PL_001 C 28.07.2025
Site Plan –
Existing
677_PL_002  28.07.2025
Site Sections –
Existing
677_PL_003 A 28.07.2025
Site Plan –
Ground Floor
677_PL_010 C 28.07.2025
Site Plan – First
Floor
677_PL_011 D 28.07.2025
Site Plan – Roof 677_PL_012 D 28.07.2025
Site Plan – Aerial
photomontage
677_PL_013 B 28.07.2025
Site Sections –
Proposed 
677_PL_020 A 28.07.2025
House Type A1 677_PL_101 C 28.07.2025
House Type A2 677_PL_102 D 28.07.2025
House Type B1 677_PL_103  B 28.07.2025
House Type B
variant plans –
accessibility
study
677_PL_104  23.10.2025 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. Timescale to be Agreed for Completion 
Page 12

Page 13

No development shall commence until details of the proposed timescale for completion
of the approved development have been submitted to and approved by the Planning
Authority. Thereafter, the development shall be implemented in accordance with the
duly approved timescale for completion unless an alternative timescale for completion
is otherwise agreed in writing with the Planning Authority. 
Reason: In order to comply with the requirements of NPF4 Policy 16F. 
3. Sustainable Drainage System 
Notwithstanding the effect of Condition 1, the development shall incorporate a surface
water drainage system which is consistent with the principles of Sustainable urban
Drainage Systems (SuDS) compliant with the guidance set out in CIRIA’s SuDS
Manual C753 and Sewers for Scotland 4th Edition. The requisite surface water
drainage shall be operational prior to the development being brought into use and shall
be maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and to
prevent flooding. 
Note to Applicant: 
Further advice on SuDS can be found in SEPA’s Standing Advice for Small Scale
Development – www.sepa.org.uk 
4. Junctions with Public Road 
Notwithstanding the provisions of Condition 1, the proposed accesses shall be formed
in accordance with the Council’s Roads Standard Detail Drawing SD08/004b and
visibility splays of 25 metres to point X by 2.4 metres to point Y from the centre line of
the proposed access. The access shall be surfaced with a bound material in
accordance with the stated Standard Detail Drawing. Prior to work starting on site the
access hereby approved shall be formed to at least base course standard and the
visibility splays shall be cleared of all obstructions such that nothing shall disrupt
visibility from a point 1.05 metres above the access at point X to a point 0.6 metres
above the public road carriageway at point Y. The final wearing surface on the access
shall be completed prior to the development first being brought into use and the
visibility splays shall be maintained clear of all obstructions thereafter. 
Reason: In the interests of road safety. 
Note to Applicant: 
• A Road Opening Permit under the Roads (Scotland) Act 1984 must be obtained
from the Council’s Roads Engineers prior to the formation/alteration of a junction
with the public road. 
• The access shall be constructed and drained to ensure that no surface water is
discharged onto the public road. 
• Bin storage areas shall be located to the rear of the bay element of the Council’s
Roads Standard Detail Drawing SD08/004b.
Page 13

Page 14

5. Parking and Turning – Further Details Required 
Notwithstanding the provisions of Condition 1, no development shall commence until
full  details of the layout and surfacing of parking and turning areas to accommodate
two vehicles per dwelling for House Types ‘A1’ and ‘A2’ and three vehicles for House
Type ‘B’ within the application site have been submitted to and approved in writing by
the Planning Authority in consultation with the Council’s Roads Engineers. The duly
approved scheme shall be implemented in full prior to the development first being
occupied and shall thereafter be maintained clear of obstruction for the parking and
manoeuvring of vehicles. 
Reason: In the interest of road safety. 
6. Landscaping and Biodiversity Enhancement 
No development shall commence until a scheme of boundary treatment, surface
treatment and landscaping has been submitted to and approved by the Planning
Authority. The scheme shall include details of: 
i) Location, design and materials of proposed walls, fences and gates; 
ii) Surface treatment of proposed means of access and hardstanding areas; 
iii) Any proposed re-contouring of the site by means of existing and proposed
ground levels; 
iv) Proposed hard and soft landscape works; 
v) A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these
benefits will be maintained for the lifetime of the development; and 
vi) A management plan for the removal of invasive non-native species, to
include a programme of monitoring and maintenance. 
The development shall not be occupied until such time as the physical biodiversity
enhancement measures (bird nesting boxes, ‘swift bricks’, wildlife ponds, bat and
insect boxes, hedgehog homes etc), the boundary treatment, surface treatment and
any re-contouring works have been completed in accordance with the duly approved
scheme. 
All biodiversity enhancement measures consisting of new or enhanced planting shall
be undertaken either in accordance with the approved scheme of implementation or
within the next available planting season following the development first being brought
into use. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme during the first planting season following the commencement of the
development, unless otherwise agreed in writing by the Planning Authority. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate.
Page 14

Page 15

Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity. 
7. Electric Vehicle Charging – Residential with off street parking 
Prior to the commencement of the development (or such other timescale as may be
agreed in writing with the Planning Authority), a scheme detailing the provision of four
minimum 7kw electric vehicle charging points shall be submitted to and approved in
writing by the Planning Authority. Where charging cannot be provided then the
appropriate ducting to future proof the property must be installed. 
The approved charging point, or where relevant, the approved cable ducting shall be
installed in full prior to the first occupation of the development, and thereafter retained
in perpetuity unless otherwise agreed in writing by the Planning Authority. 
Reason: To comply with the provisions of NPF4 Policy 13 Sustainable Transport and
LDP2 Policy 34 – Electric Vehicle Charging. 
8. Offsite Highway Improvements 
Notwithstanding the provisions of Condition 1 no development shall commence until
full details of offsite highway improvements have been submitted to and approved by
the Planning Authority in consultation with the Council’s Roads Engineers. Such details
shall incorporate: 
Notwithstanding the provisions of Condition 1 no development shall commence until
full details of offsite highway improvements have been submitted to and approved by
the Planning Authority in consultation with the Council’s Roads Engineers. Such details
shall incorporate: 
Prior to the dwellinghouses hereby granted being first occupied, the approved scheme
of works shall be completed. 
Reason: In the interest of road safety to provide a standard of access commensurate
with the scale of the development. 
(Reference: Report by Head of Development and Economic Growth dated 4 November
2025, submitted) 
7. TARBERT CONSERVATION AREA APPRAISAL AND MANAGEMENT
PLAN 
Consideration was given to a report seeking Member approval to consult on the draft
Tarbert Conservation Area Appraisal and Management Plan. 
Decision 
The Committee agreed to the consultation of the draft Tarbert Conservation Area
Appraisal and Management Plan, noting a consultation period of 6 weeks was proposed,
which would run between 5 January and 16 February 2026, with a drop in event planned
to be held on 14 January 2026. 
Page 15

Page 16

(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 17 September 2025, submitted) 
8. DEVELOPMENT MANAGEMENT PERFORMANCE UPDATE - FQ2 2025/26 
A report providing an update on the performance of the Development Management
Service for the reporting period FQ2 2025/26 was considered. 
Decision 
The Committee reviewed and agreed the content of the report. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 31 October 2025, submitted) 
The Committee resolved in terms of Section 50(A)(4) of the Local Government (Scotland)
Act 1973 to exclude the press and public for the following item of business on the grounds
that it was likely to involve the disclosure of exempt information as defined in Paragraph
13 respectively of Part 1 of Schedule 7A to the Local Government (Scotland) Act 1973. 
9. EMERGENCY TREE PRESERVATION ORDER 
Consideration was given to a request for a provisional Tree Preservation Order. 
Decision 
The Committee agreed to the recommendation detailed in supplementary report number
1. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth and Supplementary Report Number 1 dated 18 November 2025,
submitted) 
Page 16

Page 17

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle 
Reference No: 22/00680/PP
Planning Hierarchy: Local
Applicant: MacLeod Construction Ltd. 
Proposal: Erection of 8 dwellinghouses and formation of vehicular access. 
Site Address:  Land East of Knock Farmhouse, Upper Lochgair, Argyll and Bute.    
DECISION ROUTE 
☐Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
☒Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission
• Change of use of land to Class 9 Houses
• Erection of 8 dwellinghouses
• Formation of new vehicular access junction with trunk road
• Formation of adoptable access road
• Formation of vehicular parking 
• Surface drainage infrastructure   
(ii) Other specified operations
• Connection to services 
(B) RECOMMENDATION: 
Having due regard to the Development Plan and all other material consideration, it
is recommended that members approve planning permission subject to the
conditions and reasons appended to this report. 
(C) CONSULTATIONS:   
SEPA (18th April 2024) – refer to their standing advice. 
Scottish Water (15th May 2022) – has no objection to the scheme, noting that the site would
be served by Ardrishaig Water Treatment Works and Lochgair Waste Water Treatment
Works. The Applicant is informed that they must submit a pre-development enquiry to
Scottish Water following the granting of any subsequent planning permission to reserve
capacity. 
Page 17 Agenda Item 4

Page 18

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Transport Scotland (17th May 2022, 2nd July 2024 and 3rd December 2024) – originally
sought further information relating to dimensioned access junction plans. Following a series
of additional documentation submissions and re-consultations, Transport Scotland confirm
within their latest response (3rd December 2024), that they seek further clarification on
matters relating to the pedestrian link; visibility height obstruction; a speed survey to
demonstrate that a lower SSD is appropriate; and revisions to the crossing layout. 
(25th July 2025) – following the applicant’s submission of a traffic speed survey and revised
plans, Transport Scotland have no objections to the scheme subject to the inclusion of
planning conditions to ensure the access is constructed to a layout and type of construction
as approved by Transport Scotland, agreement of the details for the pedestrian link and that
drainage shall no connect to trunk road drainage systems. 
Scottish Rights of Way and Access Society (15th February 2024) – do not wish to provide
any specific comments on the scheme. 
Argyll and Bute Council Internal Consultee responses 
Area Roads Officer (19th May 2022) – has no objections subject to conditions relating to
access construction to adoptable standards, sufficient car parking spaces, a pedestrian
footway link and restriction of a vehicular link between the new development road and the
existing private road. 
Flood Risk Advisor (23rd May 2022, 10th May 2024 and 6th August 2024)- The Officer
originally requested the submission of further information to inform their recommendation
relating to a site-specific Flood Risk Assessment. Following receipt of this, the Officer
confirms they have no objections to the proposal subject to the inclusion of planning
conditions relating to Finished Floor Levels at a minimum height of 0.3m above surrounding
ground level as a mitigation measure given the proximity to the modelled surface water flood
extents; and that post-development runoff rate should be attenuated to the greenfield runoff
rate before discharge from the site. 
Environmental Health Officer (7th June 2022) – no objections subject to conditions relating
restriction on construction hours and restriction on noise levels arising from air source heat
pumps to safeguard neighbouring amenity. 
Environmental Health: Contaminated Land Officer (26th May 2022) – has no objections
subject to a planning condition to secure the implementation of a contaminated land phased
site investigation and risk assessment. 
West of Scotland Archaeological Service (15th June 2022) – has no objections subject to
the inclusion of a planning condition to secure the implementation of a programme of
archaeological works in accordance with a written scheme of investigation. 
(D) HISTORY:   
08/01340/DEP – “Erection of a terrace of four affordable dwelling houses and four (semi-
detached) dwelling houses”. Application withdrawn 01.09.2011 
10/01847/PP – “Erection of 5 terrace, 4 semi-detached and 1 detached dwelling-houses
and formation of access (amended plan)” Application approved 28.11.2013 
Page 18

Page 19

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
12/00898/PP – “Formation of access to service the drainage infrastructure (septic tank)
(relative to application reference 10/01847/PP for housing)”. Application approved
28.11.2013 
19/01872/PP Erection of 2 dwellinghouses and formation of vehicular access withdrawn
12.01.2021. 
(E) PUBLICITY:   
Regulation 20 Advert Local Application expired 10.06.2022
Neighbour Notification expired 30.05.2022 
(F) REPRESENTATIONS:   
(i) Representations received from: 
At the time of writing, representations have been received from 41 respondents in
relation to this planning application. A total of 35 respondents raise objection and 6
respondents provide general comments. 
The names and addresses of those contributing to the application are contained
within Appendix B, and full copies of the representations are published on the
planning application file and are available to view via the Public Access section of
the Council’s website. 
(ii) Summary of issues raised: 
Comments on Policy
• Contrary to LDP DM1 as it exceeds “small scale” which is defined as not
exceeding 5 houses, within villages and minor settlements.
• Council’s allocation appears to support the enlarged application contrary to
Lochgair’s size.
• No masterplan has been agreed as per previous permission requests
• Will set precedence for the development of the remainder of the site with further
housing.
• Contrary to policies LDP STRAT 1; LDP 3;LDP 9; SG LDP Hou 1; SG LDP ENV
13
• Contrary to both local and national planning policy 
Officer Comments: An analysis of the proposal against the policies of the
Development Plan is contained in full in Appendix A. The application put forward
must be considered on the merits of the scheme and determined as such. 
Local Facilities
• Village has no school, no shop, and limited public transportation
• Previous applications have not improved the village or enhanced public realm 
• Village hall has been deemed unsafe and it’s a request that a financial
contribution is sought towards the repair and upkeep of the hall as each house
is developed. 
• Village offers no employment 
Page 19

Page 20

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Officer Comment: The adopted Development Plan is the relevant statutory
document arisen through public scrutiny and relevant to this site and which in its’
making considered matters of planning need / locational bias / and sustainability. It
was acknowledged at the time of the Plans’ assessment/adoption that there was no
school or shop within the village but the need to zone this land specifically for
housing as an ‘allocation’ was identified in the full knowledge of the facts. 
Housing Design 
• Modern housing estate design contrast with traditional design of dwellings such
as Knock House and Knock Steading. 
• Proposals do not seem to relate well to the existing properties within Lochgair
• Proposed house materials do not take account of traditional stone construction
of nearby properties and use of wooden panels is not a feature which is part of
the Lochgair vernacular.
• Development is out of character with the existing village. 
Officer Comment: Whilst traditional vernacular characteristics is found within the
immediate two neighbouring properties, recognition has also had to be paid to the
changing form and characteristics of the original Lochgair as it has extended south
toward upper Lochgair which all forms part of the settlement designation as defined
within the Local Development Plan and the variations in architectural vernacular,
scale and materiality. 
Scale 
• There are 21 houses in upper Lochgair; this planning application is for 24
houses this is more than doubling the amount of properties overwhelming the
village.
• Development would cause overcrowding in a small village
• Development is too large for a small village in a rural setting to absorb
• Size of the development all be it in an incremental basis appears
disproportionate to the established settlement of Lochgair
• Density of housing is extreme. 
Officer Comment: This is a housing allocation which has been considered through
the Local Development Plan process. The scale of the development is therefore
considered to be acceptable. It should be noted that this application seeks
permission for the erection of 8 dwellings. Consideration of any additional housing
would be subject to separate planning permissions of which the acceptability of
those schemes would be considered under those applications. 
Affordable Housing
• Affordable housing in the outlying villages is a contraction in terms with today’s
travel and other costs
• Houses will become part time homes
• Affordable housing shortfalls were mainly in larger towns and do not quantify
demand at village level, therefore need for substantial additional housing in this
sensitive location has not been established.
• First phase does not include any affordable housing
• Indicative affordable housing looks very small
• It would seem possible that these houses would be used as holiday homes
bringing no benefit whatsoever to Lochgair. 
Officer Comment: The requirement to establish current ‘need’ cannot be entertained
during the assessment of this application for a development on a site specifically
Page 20

Page 21

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
‘allocated for housing’ through the statutory Local Plan process which itself
considered ‘need’ in the deliberations of its’ public assessment/scrutiny/and
adoption. 
Accessibility and Road Matters
• Pedestrian access proposes the use of a private road for the seven houses as
far as knock steading. The road is poorly constructed, narrow without a footpath
or lighting and unsuitable for adoption. 
• Concern regarding pedestrian safety when using private road. 
• Adopted road pavement is in poor condition
• Insufficient information regarding vehicular access and the safety of the
proposed junction. 
• Who is responsible for maintenance of the private road and who is liable should
a pedestrian have an accident
• New pedestrian footpath will suddenly terminate at the grass verge on the main
road.
• Consider a road safety audit should be prepared.
• Pedestrian link and amenity space are not within the boundary of this planning
application.
• A fully accessible, safety pedestrian route into lochgair should be provided
before the first house is occupied. 
• Proposed access is in a dip in the road with reduced visibility and a near a
dangerous corner. Even if the current 40 speed limit was extended, cars and
large lorries frequently ignore the notices.
• Proposal would cause parking issues in the village
• Proposal does not include a pavement to the village which would be required
for public safety for residents to reach the bus stop.
• All residents would have to commute by car to reach public services and
amenities. 
Officer Comment: These matters are considered in full within the committee report.
No objections have been received from the statutory consultees on road safety
matters subject to the imposition of planning conditions. Regarding the pedestrian
link to Upper Lochgair road, this would subject to a separate planning application for
detailed planning permission. 
Flooding
• concern regarding increased flooding due to recent felling of commercial
forestry above the site. 
• Site is on boggy ground
• Area is frequently waterlogged when it rains. 
Officer Comment: The application is supported by the necessary technical
information on such matters. The Council’s Flooding and Drainage Advisor is
content that the submitted details comply with necessary technical standards. 
Landscape
• Proposal is in an area designated as “areas of panoramic quality” and the
proposal represents over development of the site; increases in pollution and
contamination through noise and lighting; safety issues due to lack of footpaths
• Development would negatively impact the attractiveness of Lochgair contrary to
the Area of Panoramic quality designation. 
• The scale and visual impact of the proposals present unacceptable high density
and loss of character of the area
Page 21

Page 22

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Officer Comments: Landscape impacts are assessed in full in the Report of Handling
in Appendix A. Whilst the site lies within a settlement within an Area of Panoramic
Quality, the principle of the site (its location) and the scale of the development is
already established through the other aforementioned policies/ issues considered in
the same Local Development Plan. To accord with relevant policies, a planning
condition is recommended to agree biodiversity enhancement and landscaping to
achieve further betterment in terms of materials/ biodiversity/ design detailing. 
Servicing and Infrastructure
• Existing sewage arrangements would be pushed to capacity by a further 26
houses
• insufficient information provided to understand the impact on water supply,
sewage capacity impacts; Wi-Fi infrastructure; street lighting.
• Will lead to intolerable pressure on existing infrastructure of water supply,
sewage, traffic and walking paths
• water pressure to homes in Lochgair is not particularly good. Additional 8
houses would make this worse. 
Officer Comment: The application is supported by the necessary technical
information on such matters. The Council’s Flooding and Drainage Advisor, SEPA
and Scottish Water are content that the submitted details comply with necessary
technical standards.   
Natural Environment Impacts
• Contrary to the indication, there are trees on and adjacent to the site
• Site is a haven for wildlife and provides essential habitat to support and spread
of native species.
• Proposal is on a greenfield site 
Officer Comment: The site is not covered by any specific nature designation. Policy
provision allows for the development of greenfield land when it forms part of an
allocated site within the Local Development Plan which is the case in this instance.
There are trees surrounding the development which would not be directly impacted
from the proposal. Biodiversity enhancement measures are recommended to be
secured by planning condition to further enhance the biodiversity value of the site in
its developed state. 
Residential Amenity
• The development will have an adverse effect on the residential amenity of
neighbours, by reason of noise and light pollution due to the additional
residents, vehicular access and potential loss of privacy. 
• Loss of existing open views from neighbouring properties would adversely affect
the amenity of neighbouring owners.
• Gardens proposed are tiny with no room for a vegetable plot. 
Officer Comment: The right to a view is not a material planning consideration.
Comments from the Environmental Health Officer confirm that subject to planning
conditions relating to construction working hours, and operational noise levels of air
source heat pumps, the proposal would not adversely affect neighbouring amenity. 
Procedural matters
• Development is Schedule 3 Development as the proposed mass housing would
bring crowds into a generally quiet area as will the play park in latter phases;
Page 22

Page 23

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
the proposes mass housing will alter the character of the area; play park will
generate noise; and new street lighting will introduce light pollution; and the
works include a sewage pumping station and large septic tank installation,
• Given the number of objections submitted, a public hearing should be convened
in order that those who have taken the time to response are offered the
opportunity to state their case before the planning committee. 
Officer Comments: This application is for 8 dwellings and does not include
provision of a playpark. The application is being considered on the details put
forward and not therefore on future development which would be subject to their
own scrutiny through separate planning applications. The matter of a public
hearing is considered in further detail within Section (N) of this report. 
Planning History and Developer comments
• Reference to planning history of the site
• Developer has incomplete sites all around Argyll 
Officer Comments: The application is being considered on the details put forward. 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report: ☐Yes ☒No 
(ii) An Appropriate Assessment under the
Conservation (Natural Habitats) Regulations
1994:   
☐Yes ☒No 
(iii) A Design or Design/Access statement:    ☒Yes ☐No 
The document provides
a general outline of the
housing requirements for
the area, the background
to the design, potential
designs of houses,
amenity provision,
affordable housing and
general infrastructure.    
(iv) Sustainability Checklists (with reference to the requirements of LDP2
Policy 04) 
TN06 Sustainability Checklist
TN07 Sustainable Buildings Checklist
☒Yes ☐No
☒Yes ☐No  
(v) A report on the impact of the proposed
development eg. Retail impact, transport
impact, noise impact, flood risk, drainage
impact etc:  
☒Yes ☐No 
- Flood Report
- Speed Survey
Report
Page 23

Page 24

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   ☐Yes ☒No 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  ☐Yes ☒No 
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 5 – Soils
NPF4 Policy 7 – Historic Assets and Places
NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings (includes
provisions relevant to Greenfield Sites)
NPF4 Policy 11 – Energy
NPF4 Policy 12 – Zero Waste
NPF4 Policy 13 – Sustainable Transport 
Liveable Places
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 15 – Local Living and 20 Minute Neighbourhoods
NPF4 Policy 16 – Quality Homes
NPF4 Policy 17 – Rural Homes
NPF4 Policy 18 – Infrastructure First
NPF4 Policy 22 – Flood Risk and Water Management 
Argyll and Bute Local Development Plan 2 (Adopted 2024) 
Spatial and Settlement Strategy
Policy 01 – Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places
Policy 05 – Design and Placemaking
Policy 06 – Green Infrastructure
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Page 24

Page 25

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Policy 10 – Design – All Development
Policy 14 – Bad Neighbour Development
Policy 15 – Protection, Conservation and Enhancement of Our Historic Environment
Policy 21 – Sites of Archaeological Importance 
Connected Places
Policy 32 – Active Travel
Policy 33 – Public Transport
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
Policy 36 – New Private Accesses
Policy 37 – Development Utilising an Existing Private Access or Existing Private
Road
Policy 38 – Construction Standards for Public Roads
Policy 39 – Construction Standards for Private Accesses
Policy 40 – Vehicle Parking Provision 
Sustainable Communities
Policy 55 – Flooding
Policy 61 – Sustainable Urban Drainage Systems (SUDS)
Policy 62 – Drainage Impact Assessments
Policy 63 – Waste Related Development and Waste Management 
Homes for People
Policy 64 – Housing Development on Allocated Sites
Policy 67 – Provision of Housing to Meet Local Needs Including Affordable Housing 
High Quality Environment
Policy 71 – Development Impact on Local Landscape Areas (LLA’s)
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 79 – Protection of Soil and Peat Resources
Policy 82 – Contaminated Land
Policy 83 – Safeguarding Agricultural and Croft Land 
Local Development Plan 2 Schedules 
(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. 
• Third Party Representations
• Consultation Reponses
• Planning History
• ABC Technical Note – Biodiversity (Feb 2017)
• ABC draft Technical Note – Argyll and Bute Windows (April 2018)
• TN06 Sustainability Technical Note and Checklist (Oct. 2023)
• TN21 VII and LVIA Light Technical Note (Oct. 2023)
• TN07 Sustainable Buildings Technical Note and Checklist (Oct. 2023)
• ABC Landscape Studies
• ABC Housing Needs and Demand Assessment
• ABC Housing Emergency Statement
• SEPA Standing Guidance for Development Management (Dec. 2022) 
Page 25

Page 26

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  ☒Yes ☐No 
Screening Opinion attached at Appendix C.    
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  ☐Yes ☒No 
(M) Does the Council have an interest in the site:  ☐Yes ☒No 
(N) Requirement for a pre-determination hearing: ☐Yes ☒No 
A total of 41 public representations have been received in response to this planning
application. 35 objections and 6 respondents raise concern. A representation has
also been received from Cllr Dougie Philand whom requests a pre-determination
hearing is undertaken. Consideration therefore requires to be given to the benefits
of holding a pre-determination hearing. Although the application conforms with the
housing allocation conferred by the local development plan, the application does
raise issues relating to the intended means of access to the site and road safety, to
which sufficient information has been submitted to allow a full assessment of this
material planning consideration. It is the opinion of the Planning Authority that the
representations received, together with the Officer assessment of the relevant
planning issues contained within this report, provide all the information required to
enable Members to make an informed decision based on all the material planning
considerations in this case. 
It is therefore, not considered that the objections raise any complex or technical
issues that have not been addressed in the Report of Handling, and it is not
considered that a discretionary local hearing would add value to the planning
process. 
(O)(i) Key Constraints/Designations Affected by the Development:
• West Loch Fyne (Coast) Local Landscape Area
• Right of Way/174 Code – 138174 Rights of Way
• A83 (buffer = 67m) Trunk Roads
• Mid Argyll SEPA Flood Zones (Surface Water)
• SEPA Waste Water Drainage Consultation Areas
• SPR Paths - 30 October 2008 SPR Paths
• Aspiration Paths - 5th March 2014 
(O)(ii) Soils
Agricultural Land Classification:  Class 5.2 Improved Grassland
Peatland/Carbon Rich Soils Classification: ☐Class 1
☐Class 2
☐Class 3
☒N/A
Peat Depth Classification: N/A  
Page 26

Page 27

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Does the development relate to croft land? ☐Yes ☒No
Would the development restrict access to croft
or better quality agricultural land?
☐Yes ☐No ☒N/A
Would the development result in
fragmentation of croft / better quality
agricultural land?
☐Yes ☐No ☒N/A 
(O)(iii) Woodland  
Will the proposal result in loss of
trees/woodland?
(If yes, detail in summary assessment)
☐Yes
☒No 
Does the proposal include any replacement or
compensatory planting?
☐Yes
☐No details to be secured by condition
☒N/A  
(O)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application  ☐Brownfield
☐Brownfield Reclaimed by Nature
☒Greenfield 
ABC LDP2 Settlement Strategy 
☒Settlement Area
☐Countryside Area
☐Remote Countryside Area
☐Helensburgh & Lomond Greenbelt
ABC LDP2 Allocations/PDAs/AFAs etc: 
Site H3029. Allocated for housing.
Covering 1.92ha and to accommodate 26
units. 
(P) Summary assessment and summary of determining issues and material
considerations 
The application is for planning permission for a residential development on a site allocated
for housing within the adopted Argyll and Bute Local Development Plan (2024). The
principle of residential development has therefore been established by the site’s allocation
(ref.H3029). 
The proposed development would look to develop part of the allocated site with 8 detached,
residential units according with Development Plan policies on all material planning
considerations apart from road safety. 
On the matter of road safety, sufficient information has now been submitted with the
application to demonstrate that the proposed access junction with the A83 trunk road meets
Design Standards as required by the Trunk Road Authority subject to planning conditions. 
At the time of writing, public representations had been received by the Planning Authority
from 41 respondents in relation to this planning application with 31 objecting to the scheme
and the remaining respondents raising concern. Road safety is a key concern of the public
representatives.   
The proposal accords with the policy provision of the adopted National Planning Framework
4 and Local Development Plan 2 and it is recommended that planning permission be
approved subject to conditions. A full report is provided in Appendix A. 
Page 27

Page 28

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
(Q) Is the proposal consistent with the Development Plan: ☐Yes ☒No 
(R) Reasons why Planning Permission Should be Approved: 
The proposal is considered to be consistent with the relevant provisions of the
Development Plan, and there are no other material considerations of sufficient
significance to indicate that it would be appropriate to withhold planning permission
in principle having regard to s25 of the Act. 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
Not applicable. 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
☐Yes ☒No 
Author of Report: Laura MacDonald Date: 27.11.2025 
Reviewing Officer: Peter Bain Date: 04.12.2025 
Fergus Murray
Head of Development & Economic Growth 
Page 28

Page 29

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 22/00680/PP 
Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 31/03/2022, supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan 4724/101  01/04/2022
Site Plan 4724/102 J 18/07/2025
Longitudinal
Section along A83
showing visibility
heights
4724/117 D 15/07/2025
Proposed Floor
Plans Plot 1
4724/103  01/04/2022
Proposed
Elevations Plot 1
4724/104  01/04/2022
Proposed Floor
Plans Plot 2
4724/105  01/04/2022
Proposed
Elevations Plot 2 
4724/106  01/04/2022
Proposed Floor
Plans Plot 3
4724/107  01/04/2022
Proposed
Elevations Plot 3
4724/108  01/04/2022
Proposed Floor
Plans Plot 4
4724/109  01/04/2022
Proposed
Elevations Plot 4
4724/110  01/04/2022
Proposed Floor
Plans Plot 5 and 7
4724/111  01/04/2022
Proposed
Elevations Plot 5
and 7
4724/112  01/04/2022
Proposed Floor
Plans Plot 6 and 8
4724/113  01/04/2022
Proposed
Elevations Plot 6
and 8
4724/114  01/04/2022
Fence/Heat pump
details
4724/115  01/04/2022 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.
Page 29

Page 30

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
2. PP – Affordable housing with Commuted Sum option 
Notwithstanding the effect of Condition 1, no development shall commence until a
scheme for the provision of affordable housing (as defined below) has been submitted
to and approved in writing by the Planning Authority. The scheme shall: 
a) Provide that a minimum of 25% of the approved dwellings are affordable
homes;
b) Define those properties to be used as affordable homes;
c) Establish the timing of their provision relative to the phasing of the
development, which shall ensure that the last 25% of the dwellings within the
development are not commenced until the affordable housing phase has bene
completed for occupation;
d) Establish the arrangements to ensure the affordability of the affordable homes
for both initial and subsequent occupiers (including any discount rate
applicable in terms of (ii) below); OR
e) Alternatively, shall provide for an equivalent Commuted Sum Payment to the
Council’s Strategic Housing Fund having regards to the report ‘Valuation of
Commuted Sum Payments’ approved by Argyll and Bute Council on 27th June
2013. 
For the purposes of this condition ‘affordable homes’ are defined as being either: 
i) Social housing (rented or shared ownership or shared equity) managed by a
registered social landlord (a body registered under part 3 chapter 1 of the
Housing (Scotland) Act 2001, or any equivalent provision in the event of the
revocation and re-enactment thereof, with or without modification);
ii) Discounted low cost sale housing (subject to a burden under the Title
Conditions (Scotland) Act 2003), or any equivalent provision in the event of the
revocation and re-enactment thereof, with or without modification).
iii) Housing for sale or rent without subsidy, which is designed to be affordable
and to meet the housing needs of the majority of those households identified
as in housing need in the Local Housing Strategy or Housing Market Study i.e.
one or two person households on average income, with conditions attached to
their missives to prevent further extension, thereby helping to ensure that they
are likely to remain affordable to subsequent purchasers. 
The development shall be implemented and occupied thereafter in accordance with
the duly approved scheme for affordable housing. 
Reason: To accord with the provisions of the development plan in respect of affordable
housing provision. 
3. PP – Landscaping 
No development shall commence until a finalised scheme of boundary treatment;
surface treatment and landscaping has been submitted to and approved by the
Planning Authority. The scheme shall comprise a planting plan and schedule which
shall include details of: 
i) Existing and proposed ground levels in relation to an identified fixed datum;
ii) Existing landscaping features and vegetation to be retained;
iii) Location design and materials or proposed walls, fences and gates;
Page 30

Page 31

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
iv) Proposed soft and hard landscaping works including the location, species,
and size of every tree/ shrub to be planted;
v) A programme for the timing, method of implementation, completion and
subsequent ongoing maintenance for all planting
vi) A biodiversity statement demonstrating how the proposal will contribute to
the conservation/ restoration/ enhancement of biodiversity, and how these
benefits will be maintained for the lifetime of the development. 
The development shall not be occupied until such times as the boundary treatment,
surface treatment and any re-contouring works have been completed in accordance
with the duly approved scheme. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme during the first planting season following the commencement of the
development, unless otherwise agreed in writing by the Planning Authority. 
Any trees/shrubs which within a period of five years from the completion of the
approved landscaping scheme fail to become established, die, become seriously
diseased, or are removed or damaged shall be replaced in the following planting
season with equivalent numbers, sizes and species as those originally required to be
planted unless otherwise approved in writing by the Planning Authority.
The Biodiversity Statement should refer to Developing with Nature Guidance,
NatureScot as appropriate. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity, and to comply with the requirements of NPF4 Policy 3. 
4. PP – Footpath link 
No development or site clearance works shall commence, for the development hereby
permitted, until detailed planning permission has been granted for the footpath link
outwith the red line boundary as indicated on the approved Site Plan drawing number
“4724/102 Revision J”. 
Reason: to ensure that facilities are provided for the pedestrians that are generated
by the development and that they may access the existing footpath system without
interfering with the safety and free flow of traffic on the A83 trunk road.   
5. PP – Junction with Public Road 
Prior to the commencement of the development, the proposed access on the A83 trunk
road, as generally illustrated by the approved site plan, drawing number “4724/102
Revision J”, shall be constructed to a layout and type (and method) of construction to
be approved by the Planning Authority, in consultation with Transport Scotland.
Reason: To ensure that the standard of access layout complies with the current
standards and that the safety of the traffic on the trunk road is not diminished. 
6. PP – Trunk Road Drainage system 
There shall be no drainage connections to the trunk road drainage system. 
Reason: to ensure that the efficiency of the existing drainage network is not affected. 
Page 31

Page 32

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
7. PP – Internal layout access 
Notwithstanding the provisions of Condition 1, the proposed accesses to the new
adoptable standard development road shall be formed in accordance with the
Council’s Roads Standard Details; and visibility splays of 25 metres to point X by 2.4
metres to point Y from the centre line of the proposed access. The access shall be
surfaced with a bound material in accordance with the stated Standard Detail
Drawing. Prior to work starting on site the access hereby approved shall be formed
to at least base course standard and the visibility splays shall be cleared of all
obstructions such that nothing shall disrupt visibility from a point 1.05 metres above
the access at point X to a point 0.6 metres above the public road carriageway at point
Y. A dropped kerb crossing point shall be provided at each access with the access
surfaced for a distance of 5 metres from back of footway. The final wearing surface
on the access shall be completed prior to the development first being brought into use
and the visibility splays shall be maintained clear of all obstructions thereafter. 
Reason: In the interests of road safety. 
8. PP – Construction Hours 
Notwithstanding the provisions of Condition 1, the construction of the development
hereby permitted shall be restricted to the specified hours of 0800-1800 hours
Monday to Friday, 0800 – 1300 hours Saturday and not at all on Sunday, Bank or
Scottish Public Holidays unless otherwise agreed in writing by the Planning
Authority. 
Reason:  To minimise the impact of noise, generated by construction activities on
occupiers of residential properties.
9. PP – Parking and Turning   
The provision of parking and turning for the development hereby permitted, shall
accord with the requirements of Policy 40 and Table 5 of the Argyll and Bute Local
Development Plan 2 2024. 
Reason: to ensure an adequate number of vehicle parking spaces to meet
development needs. 
10. PP- Finished Floor levels 
Notwithstanding the provisions of Condition 1, the finished ground floor levels of the
dwellings, hereby permitted, shall be at least 0.3m above surrounding ground level,
unless otherwise agreed in writing by the Planning Authority.
Reason: in order to ensure appropriate mitigation for flood risk and to ensure an
acceptable relationship between the development and its surroundings. 
11. PP – Runoff Rate   
The post development runoff rate should be attenuated to the greenfield runoff rate
before discharge from site. Any drainage at the site should be designed in
accordance with CIRIA C753. 
Reason: in the interests of flood risk prevention. 
Page 32

Page 33

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
12. PP – Programme of Archaeological Works   
No development shall take place within the development site, as outlined in red on
the approved plan until the developer has secured the implementation of a
programme of archaeological works in accordance with a written scheme of
investigation which has been submitted to and approved in writing by the Planning
Authority in consultation with the West of Scotland Archaeological Service.
Thereafter the developer shall ensure that the programme of archaeological works
is fully implemented and that all recording and recovery of archaeological resources
within the development site is undertaken to the satisfaction of the Planning
Authority in consultation with the West of Scotland Archaeological Service. 
Reason: In order to comply with the requirements of NPF4 Policy 16F. 
13. PP – ASHP Noise limits   
The noise level from the operation of the air source heat pumps hereby approved
must not exceed 42dB LAeq (5 min) at 1 metre from the window of a habitable room
on the façade of any neighbouring residential property. If, in the opinion of the Local
Planning Authority the proposed air source heat pumps result in any noise nuisance
to the occupant of any neighbouring dwelling the Applicant shall install noise
mitigation measures in agreement with the Planning Authority.
Reason: To ensure that the residential amenities that occupiers can reasonably
expect to enjoy are adequately protected.
14. PP – Contaminated Land Assessment   
No development, demolition or ground-breaking works shall commence until a
scheme is submitted by the Developer (at their expense) to identify and assess
potential contamination on site and approved, by the Planning Authority, and is
thereafter implemented in accordance with the scheme so approved. The scheme
shall be undertaken by a competent person or persons in accordance with relevant
authoritative guidance including PAN 33 (2000) and BS10175:2011 or, in the event
of these being superseded or supplemented, the most up-to-date version(s) of any
subsequent revision(s) of, and/or supplement(s) to, these documents. This scheme
should contain details of proposals to investigate and remediate potential
contamination to the satisfaction of the Planning Authority, and must include:- 
a) A desk study and development of a conceptual site model including (where
necessary) a detailed site investigation strategy. The desk study and the
scope and method of recommended further investigations shall be agreed
with the Council prior to addressing parts b, c, and d of this condition. 
Should the desk study show the need for further assessment this will be undertaken
in the following sequence: 
a) A detailed investigation of the nature and extent of contamination on site,
and assessment of the risks such contamination presents.
b) Development and agreement of a remedial strategy (if required) to treat/
remove contamination ensuring the site is made suitable for its proposed use
(this shall include a method statement, programme of works, and proposed
verification plan).
Page 33

Page 34

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
c) Submission of a verification report for any agreed remedial actions detailing
and evidencing the completion of these works. 
Written confirmation from the Planning Authority, that the scheme has been
implemented and completed shall be required by the Developer before any
development hereby approved commences. Where remedial measures are required
as part of the development construction detail, commencement must be agreed in
writing with the Planning Authority. 
Reason: To ensure that the potential risks to human health, the water environment,
property, and, ecological systems arising from any identified land contamination
have been adequately addressed. 
15. PP – Arrangements for Waste 
No development shall commence until a waste strategy detailing how much waste
the proposal is expected to generate and detailing the arrangements for the storage,
separation and collection of waste from the site, including provision for the safe pick
up by refuse collection vehicles, have been submitted to an approved in writing by
the Planning Authority. Thereafter the duly approved provision shall be implemented
prior to the first occupation of the dwellings which it is intended to serve. 
Reason: In order to ensure that satisfactory arrangements have been made for
dealing with waste on the site in accordance with NPF4 Policy 12. 
16. PP – Materials 
No development shall commence until full details /samples of materials to be used
in the construction of the dwelling houses hereby approved have been submitted to
and approved in writing by the Planning Authority. The development shall thereafter
be completed using the approved materials or such alternatives as may be agreed
in writing with the Planning Authority. 
Reason: In order to integrate the development into its surroundings. 
17. PP – Restriction of PD Rights 
Notwithstanding the provisions of the Town and Country Planning (General
Permitted Development) (Scotland) Order 1992 (as amended), (or any Order
revoking and re- enacting that Order(s) with or without modifications), nothing in
Article 2(4) of or the Schedule to that Order, shall operate so as to permit, within the
area subject of this permission, any development referred to in Part 1 and Classes
1A, 1B, 1C, 1D, 2A, 2B, 3A, 3AA, 3B, 3C, 3D and 3E and Part 2 and Classes 8 and
9 of the aforementioned Schedule, as summarised below: 
PART 1: DEVELOPMENT WITHIN THE CURTILAGE OF A DWELLINGHOUSE 
Class 1A: Any enlargement of a dwellinghouse by way of a single storey ground floor
extension, including any alteration to the roof required for the purpose of the
enlargement. 
Class 1B: Any enlargement of a dwellinghouse by way of a ground floor extension
consisting of more than one storey, including any alteration to the roof required for
the purpose of the enlargement. 
Class 1C: The erection, construction or alteration of any porch outside any external
door of a dwellinghouse. 
Class 1D: Any enlargement of a dwellinghouse by way of an addition or alteration to
its roof.
Page 34

Page 35

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Class 2A: The erection, construction or alteration of any access ramp outside an
external door of a dwellinghouse. 
Class 2B: Any improvement, addition or other alteration to the external appearance
of a dwellinghouse that is not an enlargement. 
Class 3A: The provision within the curtilage of a dwellinghouse of a building for any
purpose incidental to the enjoyment of that dwellinghouse or the alteration,
maintenance or improvement of such a building. 
Class 3AA: The provision within the curtilage of a dwellinghouse of a building for any
purpose incidental to the enjoyment of that dwellinghouse.
Class 3B: The carrying out of any building, engineering, installation or other
operation within the curtilage of a dwellinghouse for any purpose incidental to the
enjoyment of the dwellinghouse. 
Class 3C: The provision within the curtilage of a dwellinghouse of a hard surface for
any purpose incidental to the enjoyment of that dwellinghouse or the replacement in
whole or in part of such a surface. 
Class 3D: The erection, construction, maintenance, improvement or alteration of any
deck or other raised platform within the curtilage of a dwellinghouse for any purpose
incidental to the enjoyment of that dwellinghouse. 
Class 3E: The erection, construction, maintenance, improvement or alteration of any
gate, fence, wall or other means of enclosure any part of which would be within or
would bound the curtilage of a dwellinghouse.
PART 2: SUNDRY MINOR OPERATIONS 
Class 8: Formation of means of access to an unclassified road. 
Class 9: Stone cleaning or painting of the exterior of a building. No such
development shall be carried out at any time within this Part and these Classes
without the express grant of planning permission. 
Reason: To protect the sensitive area and the setting of the proposed
dwellinghouses, in the interest of visual amenity and public health, from
unsympathetic siting and design of developments normally carried out without
planning permission; these normally being permitted under Article 2(4) of the Town
and Country Planning (General Permitted Development) (Scotland) Order 1992 (as
amended). 
18. PP – Provision of Play/ Amenity Space 
No development shall commence until details for the provision and maintenance of
areas of communal open space and equipped play area(s) relating to the development
been submitted to and approved in writing by the Planning Authority. The details shall
comprise EITHER: 
Direct Provision of Play/Amenity Space: 
i) Provision to satisfy the minimum standards set out in the Development Plan;
6sqm of equipped play space and 12sqm of informal open space per
dwelling unit;
ii) Specification of play equipment to be installed, including surface treatments
and any means of enclosure, designed in accordance with the provisions of
BS5696 (Play Equipment Intended for Permanent Installation Outdoors);
iii) Proposals for the timing of the implementation of the play area(s) in relation
to the phasing of the development;
iv) A maintenance schedule for communal open spaces and equipped play
areas in accordance with the provisions of BS5696 including details of on-
going inspection, recording and procedures for detailing with defects. 
Page 35

Page 36

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
The communal open space and equipped play area(s) shall be provided in accordance
with the duly approved details and shall be retained and maintained to the specified
standards thereafter. 
OR: 
Indirect Provision of Play/Amenity Space: 
The provision of a direct financial contribution to be held and administered by the
Council for the purpose of providing for the delivery of a commensurate play/amenity
space to serve the development within a later phase of the development of designations
H3029. 
The calculation of the value of the direct financial contribution will be based upon the
cost of delivery and ongoing maintenance of a facility which would meet the Council’s
minimum playspace requirements for the approved development as set out in the Argyll
and Bute Local Development Plan 2. 
The development hereby approved shall not be first occupied until such time as a formal
agreement between the developer and the Council for the payment and administration
of the direct financial contribution for the deferred provision of playspace has been
signed. 
Reason: In order to secure provision of communal open space and equipped play areas
within the development in accordance with the minimum standards set out in the
Development Plan. 
Note for the Applicant/Developer: It is noted that discharge of this condition by means
of ‘direct provision of play/amenity space’ would require to be the subject of a further
application for planning permission given that the development as approved does not
include sufficient site area to accommodate the requisite play/amenity space. It is
further advised that discharge of this condition by means of ‘indirect provision of
play/amenity space’ shall require to be the subject of an appropriate formal agreement
between the Developer and the Council under the provisions of either S75 of the Town
and Country Planning (Scotland) Act 1997, or the provisions of S69 of the Local
Government (Scotland) Act 1973. 
ADDITIONAL NOTES TO APPLICANT 
• A Road Opening Permit under the Roads (Scotland) Act 1984 must be obtained from
the Council’s Roads Engineers prior to the formation/ alteration of a junction with the
public road.
• The access shall be constructed and drained to ensure that no surface water is
discharged onto the public road.
• The Applicant is advised to contact Scottish Water completing and submitting a Pre-
Development Enquiry (PDE) Form directly to Scottish Water via their Customer Portal
prior to any formal Technical Application being submitted. 
Transport Scotland Informatives
• The Applicant should be informed that the granting of planning consent does not
carry with it the right to carry out works within the trunk road boundary and that
permission must be granted by Transport Scotland’s Roads Directorate. Where
any works are required on the trunk road, contact details are provided on
Page 36

Page 37

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Transport Scotland’s response to the Planning Authority which is available on the
Council’s planning portal.
• Trunk Road modification works shall, in all respects, comply with the Design
Manual for Roads and Bridges and the specification for Highway Works published
by HMSO. The developer shall issue a certificate to that effect signed by the
design organisation.
• Trunk Road modifications shall, in all respects, be designed and constructed to
arrangements that comply with the Disability Discrimination Act; Good Practice
Guide for Roads published by Transport Scotland. The developer shall provide
written confirmation of this, signed by the design organisation. 
• The road works which are required due to the above Conditions will require a Road
Safety Audit as specified by the Design Manual for Roads and Bridges. 
• Any trunk road works will necessitate a Minute of Agreement with the Trunk Roads
Authority prior to commencement. 
Page 37

Page 38

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
COMMITTEE REPORT
APPENDIX A – RELATIVE TO APPLICATION NUMBER:  22/00680/PP 
PLANNING LAND USE AND POLICY ASSESSMENT 
1. Introduction 
1.1. The proposal, the subject of this application, is seeking to secure planning permission for
the erection of 8 detached dwellinghouses, the formation of vehicular access and
associated servicing infrastructure. 
1.2. The key planning considerations in this case are: 
a) Compliance with the Development Plan and other relevant planning policy; and
b) Any other material considerations. 
2. Settlement Strategy 
2.1. The application site covers an area of approximately 0.94ha which is currently agricultural
land. Policy 9 of NPF4 confirms under criterion (b) that proposals on greenfield sites will
not be supported unless the site has been allocated for development, or the proposal is
explicitly supported by policies in the Local Development Plan [LDP2]. This is further
established by Policy 16 of NPF4 which supports the development of new homes on
allocated sites within LDPs.   
2.2. A key role of LDP2 is to provide an effective land supply for new development. This
provision is primarily set out in the form of allocations for different specified uses. The
allocations include an indication of the number of homes that may be accommodated on
housing sites. It is noted that the housing provision numbers are indicative, and in
appropriate circumstances may be varied at the discretion of the Planning Authority. 
2.3. In terms of the Local Development Plan Settlement Strategy, the application site lies
within a defined settlement and utilises part of an allocated housing site under reference:
H3029 within LDP2 which has an indicative capacity of 26 units and is within the
settlement of Lochgair. The allocation within LDP2 was included to provide an opportunity
to meet an identified need for housing, including affordable housing. Housing allocations
are specifically intended to address the housing requirements identified in the Local
Housing Strategy, informed by the Housing Need and Demand Assessments
supplemented by local housing studies. The allocation of this site within LDP2 therefore
demonstrates a housing need for the area in accordance with LDP2 Policy 64. 
2.4. Drawing the above together, residential development at the site is considered acceptable
in principle, subject to the acceptability of the detailed matters set out below. 
3. Location, Nature and Design of Proposed Development 
3.1. Lochgair is classed as a Village/Minor Settlement which has developable land, is on a
trunk road, a hotel and a village hall but no shop or primary school. The scale and nature
of this single allocation for housing is considered to be commensurate to the village
capacity and appropriate to provide for growth into the future. H3029 allocation
contributes to the established housing land supply in this area. The allocation carries a
requirement for a minimum of 25% affordable housing delivery.
Page 38

Page 39

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
3.2. NPF4 Policy 15(a) seeks development proposals to contribute to local living including,
where relevant, 20-minute neighbourhoods. To establish this, consideration will be given
to existing settlement pattern, and the level and quality of interconnectivity of the proposed
development with the surrounding area, including local access to a number of facilities. 
3.3. The LDP2 settlement strategy seeks to deliver sustainable levels of growth by steering
the majority of development to our existing settlements where the most of our current
infrastructure, services, employment opportunities, housing and community facilities are
to be found and thereby making best use of these resources is a sustainable approach to
development. In this instance, the site, by virtue of being allocated as a housing allocation
site, would reasonably comply with NPF4 Policy 15 given the scale of the environment
within which the development is to be located, and given its compliance with the existing
settlement pattern and the level and quality of interconnectivity of the proposed
development with the surrounding area where people can reasonably meet the majority
of their daily needs within a reasonable distance of their home. 
3.4. This application is for the development of eight newbuild dwellings with vehicular access
and associated infrastructure and landscaping. The site is located on the southern
outskirts of Lochgair, immediately west of the A83 and is surrounded by rough open land
to the south and east with forested land and residential dwellings to the north and west.
The proposal will form the new southern extent of Lochgair. It is positioned between the
built-up area of the rural settlement to the north and the open countryside to the south.
By virtue of its inclusion within LDP2 as a housing allocation, it has already been accepted
that this is a suitable site for housing in landscape terms and subject to an acceptable
layout and good landscaping (to be controlled by planning condition), the proposal would
accord with Policies 01 and 04 of LDP2 and Policy 9 of NPF4. 
4. Affordable Housing   
4.1. Policy 16 of NPF4, and Policy 67 of the LDP2 require all new housing developments of 8
or more units to contribute a proportion of affordable housing, with a benchmark minimum
contribution of 25% of the total number of units on the site. In addition, all new
developments of this scale will be required to provide a range of house types and sizes
to meet the local housing needs and demand identified in the HNDA for each housing
market area. 
4.2. In this case, the proposal looks to develop eight 3–4-bedroom dwellings as part of a wider
allocation site. The proposed site plan shows an indicative future layout which includes
the affordable housing requirement for the allocation. It is common practice for housing
developers to build larger sites in phases to allow the initial development to release funds
to construct the remainder of the site. To ensure that the 25% affordable housing is
delivered, a planning condition is required which would require the Applicant to pay a
commuted sum towards affordable housing should the future phase of development not
be forthcoming. Subject to the inclusion of the planning condition, the proposal would
accord with NPF4 Policy 16 and LDP2 Policy 67. 
5. Road Network, Parking and Associated Transport Matters 
5.1. The site is proposed to be accessed from a new, single priority junction to be located on
the eastern site boundary adjoining the A83 trunk road. The internal access layout is
formed in a ‘T’ shape from the junction, with indicative links to future site phases
connecting into the internal road layout to the north and south. Pedestrian footways are
proposed on both sides of the carriageway with an indicative pedestrian link annotated
outwith the development site boundary linking the proposed site to the village centre by
Page 39

Page 40

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
the existing Upper Lochgair access road. The internal road layout is proposed to be
constructed to an adoptable standard and each dwelling is served with its own offroad
parking provision. The number of parking spaces proposed accords with the Local
Development Plan’s Parking Standards. 
5.2. NPF4 Policy 13 seeks to encourage, promote and facilitate developments that prioritise
walking, wheeling, cycling and public transport for everyday travel and reduce the need
to travel unsustainably. The development is not considered to be a significant travel
generating use or a proposal where it is considered important to monitor travel patterns
resulting from the development. Significant public representation has been received
raising concerns regarding road safety arising from the development. 
5.3. The Council’s Area Roads Officer provides commentary on the internal road layout of the
site and has no objections to the scheme subject to the inclusion of a number of planning
conditions relating to the proposal meeting Design Standards in relation to each dwelling
connection access point onto the adoptable road layout; car parking numbers to serve
each dwelling; no vehicular connection to the UC66 Upper Lochgair Road and the
provision of a pedestrian footway link between the development and the UC66 Upper
Lochgair road. Planning conditions are therefore required in accordance with this
recommendation. It is noted that the pedestrian footway link lies on land outwith the
development boundary of this planning application, but within land which the Applicant
has control of. On this basis a planning condition requiring the prior granting of planning
permission for a separate application covering the pedestrian link before any works
commence on this development, should be attached to any subsequent decision notice.
This is to ensure delivery of this link which provides key connectivity of the site to the
village centre and public transport provision. 
5.4. Transport Scotland have provided commentary on the acceptability of the site’s access
junction with the A83 due to it being a connection to the trunk road. During the progression
of the application, Transport Scotland have sought several amendments and further
information requests with the Applicant due to the lack of information to allow them to fully
assess the proposal’s compliance with the Design Standards for priority junctions as set
out in the Design Manual for Roads and Bridges. The Applicant has subsequently
provided revised and additional information including a Speed Survey to meet Transport
Scotland’s information requirements providing clarification on: 
a) The purpose of the proposed rural hardstanding areas and A83 crossing at the
junction; 
b) The submission of a speed survey to demonstrate that a lower Stopping Sight
Distance (SSD) is appropriate; 
c) If any consideration has been given to locating the proposed access within the 40mph
speed limit at the location of the existing gated access;
d) Submission of a Departures from Standards application to Transport Scotland due to
the proposed 0.26m object height of visibility not being achievable to the south of the
proposed access; and 
e) that the proposed ‘temporary pedestrian access’ link is of an appropriate standard to
ensure its use should future phases not come forward as there are no pedestrian
footway facilities on the A83. 
5.5. It is also confirmed that Transport Scotland would not welcome the extension of the
40mph limit to a location beyond the development site. 
5.6. Transport Scotland confirm they remove their holding objection subject to the inclusion of
planning conditions for the prior agreement of the access construction method and type,
provision of the pedestrian access link prior to occupation and that no drainage
Page 40

Page 41

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
connections to the trunk road drainage system shall occur. Transport Scotland also
confirm that development of this first phase would not preclude the delivery of the wider
housing allocation site and the design of the proposed junction is appropriate for the level
of housing of the allocation. 
5.7. Sufficient information has now been submitted in support of the application which
demonstrates to the satisfaction of the key statutory consultees, Transport Scotland and
the Council’s Area Roads Officer that the proposal would not adversely impact road
safety.  On this basis, the proposal accords with NPF4 Policy 13 and LDP2 Policies 01,
35 and 38. 
6. Built Environment 
6.1. Policy 14 of NPF4, promotes well designed developments that make successful places
by taking a design-led approach and applying the Place Principle. Proposals should be
consistent with the six qualities of successful places: healthy, pleasant, connected,
distinctive, sustainable, and adaptable. Policies 5 and 10 of LDP2 relate to design and
place making and development setting, layout and design. 
6.2. Policy 16(c) of NPF4 requires housing mixes of schemes to improve affordability and
choice by being adaptable to changing and diverse needs. The development provides an
initial housing mix of 3-4-bedroom, detached units. 
6.3. The design considers the relationship between the buildings to each other and to the
street, and all streets are overlooked to create pleasant pedestrian environments and
active street frontages. Car parking is contained on-plot to promote a pedestrian friendly
environment throughout the development. 
6.4. In respect of the character and density of surrounding development, the wider area
predominantly takes a linear form to roads with a higher density of units erected within
Upper Lochgair, formed of a mix of housing types and heights. 
6.5. The housing development takes form centrally within the site with a vegetated buffer to
be provided along the eastern site boundary, and indicative future development layouts
being shown to the north and south of the proposal. The architecture of the site takes
form from modern vernacular comprising simple forms of 1 ½ storey structures with a
limited material palette of rendered elevations, grey UPVC fenestration and tiled roofs.
The scale and massing reflect that found within the wider settlement area. All units are
proposed with traditional features of dual pitched roofs. The design, scale and massing
of the housing is appropriate for its setting. The layout of the housing provides a central
street network with adequate permeability being provided through the inclusion of a
pedestrian link to Upper Lochgair Road which would be subject to a separate planning
application and conditioned through this decision. All residential units would have private
amenity space, and the plot ratios are considered to be acceptable. 
6.6. The development has been designed and will be constructed to make provision for the
access of people with disabilities including the design of dwellings to enable the internal
layout to be readily adaptable for use by disabled persons. 
6.7. NPF4 Policy 11(a) states that development proposals for all forms of renewable, low-
carbon and zero emissions technologies will be supported. The proposed development,
through the provision of air source heat pumps to serve each dwellinghouse, would
contribute to the expansion of low-carbon and zero emission technologies. 
Page 41

Page 42

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
6.8. Policy 68 of LDP2 require residential developments at the scale of the proposed allocation
to provide associated housing green space of both a casual and formal nature. This
comprises a minimum of 12sqm of communal casual open space per dwelling, and 6sqm
of children’s play space, including provision for under 5 year olds. This policy also requires
the developer to maintain and provide public liability insurance for the play space. This
application is for the first phase of development for the allocation. The scheme as put
forward looks to construct 8 dwellings with the remaining dwellings and the associated
housing greenspace brought forward within the later development phases. To accord with
policy requirements and ensure the delivery of the open space and play space for the
allocated site as a whole, a planning condition is required to agree either the direct
provision of this through a separate planning application or the indirect provision through
an appropriate formal agreement and commuted sum. Subject to this condition, the
proposal accords with LDP2 Policy 6 and 68 and NPF4 Policy 20 which support the
provision of enhanced blue and green infrastructure and requires the provision of well-
designed play, recreation and relaxation areas. 
6.9. The overall development is considered to present an attractive and appropriate residential
design for this site which will accord with policy objectives of the LDP and NPF4. The
proposals are therefore considered to accord with the requirements of policies 5, 8, 9, and
10 LDP2 and Policies 14, 16 and 17 of NPF4. 
7. Natural Environment 
7.1. Policy 1 of NPF4 requires that significant weight is given to the global climate and nature
crisis when consideration is given to new development. Policy 3 seeks to ensure that
development will conserve, restore and enhance biodiversity. Policy 4 seeks to protect,
restore and enhance natural assets including protected areas. 
7.2. The development proposed by the current planning application is considered appropriate
in terms of its type, location and scale such that it will have no unacceptable impact on
the natural environment. The proposed development is not within any designated
European site of natural environment conservation or protection, it is not located within a
National Park, a National Scenic Area a SSSI or RAMSAR site, or a National Nature
Reserve. Neither is it located within a site designated as a local nature conservation site
or within an area identified as wild land. Whilst the site is located within the West Loch
Fyne (Coast) Local Landscape Area, the application proposes a small scale residential
development, within an area identified for housing development in LDP2, where it will be
viewed in the context of the existing built environment of Lochgair, therefore it is the
considered opinion of the Planning Authority that the proposal will not result in any
significant adverse effects on the integrity of the area or the qualities for which it has been
identified. 
7.3. With regards to the need in NPF4 Policy 3 to secure biodiversity improvements, it is not
considered that there are any issues of compliance with Policy 3. Whilst the Supporting
Statement details that habitat improvements have been incorporated into the site design
including the provision of native species planting within the SUDS features, it is
considered appropriate to impose a condition on the grant of any permission to secure
the finer detail of these proposals as part of the wider landscaping and boundary treatment
measures for the site. With a condition to secure the finer details of the biodiversity
enhancement, the proposal aligns with the broad aims of NPF4 Policy 3 and is consistent
with the requirements of LDP2 Policy 73. 
8. Impact on Soils and Contaminated Land Considerations 
Page 42

Page 43

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
8.1. The site comprises a field of improved grassland which is categorised as Class 5 (No
peatland habitat recorded). The development of this site would therefore not adversely
impact prime agricultural land in accordance with LPD2 Policy 83, nor high quality
peatland habitat. In accordance with NPF4 Policy 5 and LDP2 Policy 79, a planning
condition would be required to secure a soil management plan during the construction
phase of the development. 
8.2. In accordance with LDP2 Policy 82, the Council’s Contaminated Land Officer requires the
inclusion of a planning condition for the agreement and implementation of a contaminated
land site investigation assessment due to the proposal being the redevelopment of land
where there is an indication of a previous use which may have been contaminative. 
9. Historic Environment 
9.1. Policy 7 of NPF4 requires developments to demonstrate how they have mitigated against
potential impacts on the historic environment. Policy 15 of LDP2 further iterates that
development proposals will not be acceptable where they fail to protect, preserve,
conserve or enhance the established character of the historic built environment. Policy 21
of LDP2 seeks to ensure the same protection occurs with archaeological heritage. 
9.2. There are no designated heritage assets within the Proposed Development Area or within
the immediate wider area to which the proposal would affect the setting of. With regards
to non-designated heritage assets, it is understood that the application site lies in a
landscape populated with recorded archaeological sites of prehistoric, medieval and later
date. The large area of ground that will be disturbed by this development stands a good
chance of unearthing visible or buried unrecorded remains which could be of any period
and as such the West of Scotland Archaeological Service recommend the inclusion of a
programme of archaeological works as a planning condition on any subsequent decision. 
9.3. Having due regard to the above and subject to the condition recommended by the West
of Scotland Archaeology Service, it is concluded that the proposal would not have any
adverse impacts on the historic environment, including listed buildings and their settings,
and is therefore consistent with the provisions of Policy 7 of NPF4 and Policies 15 and 21
of LDP2. 
10. Infrastructure and Waste Management 
10.1. Policy 2 of NPF4 requires that development is sited and designed to adapt to current
and future risks from climate change. The site is not at risk of fluvial flooding. The
indicative limits of surface water flooding shown upon the SEPA Flood Map overlies with
part of the north and middle sections of the site. These areas are where two small
watercourses cross through the site. The indicative limits, however, are not overlain with
the locations of the proposed newbuilds but do come near Plot 1. The submitted Flood
Risk Assessment confirms that all the proposed dwellings are outside of the modelled
flood extent from the small watercourse and the dwellings are outwith the surface water
flood extent from the drains to the south. The Flood Risk Advisors recommend that
Finished Floor Levels are at leas 0.3m above surrounding ground level as a mitigation
measures, given the proximity to the modelled surface water flood extents. The Advisor
also recommends a planning condition to ensure the post development runoff rate arising
from the swale is attenuated to the greenfield runoff rate before discharge from the site.
Subject to the inclusion of the planning conditions the proposal accords with NPF4 Policy
22 and LDP2 Policy 55. 
Page 43

Page 44

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
10.2. The proposal will be connected to the mains water supply and mains foul drainage
infrastructure within the area subject to formal capacity reviews post planning consent
with Scottish Water. The infrastructure connections are therefore considered acceptable. 
10.3. NPF4 Policy 12 seeks to encourage, promote and facilitate development that is
consistent with the waste hierarchy as defined within the policy document. The
development the subject of this planning application seeks to secure permission for 8
dwellinghouses. Whilst this is a development likely to generate waste when operational,
it will be served by regular waste uplifts by the Council and will be expected to comply
with the Council’s adopted and enforced recycling and reuse strategy. The application
shows an area within the grounds of each dwellinghouse for the storage of refuse bins. A
planning condition is required to agree uplift locations by the Council’s Refuse Collection
Vehicle within the site. Subject to the inclusion of this condition, the proposal would accord
with NPF4 Policy 12 and LDP2 Policy 63.   
11. Impact on Amenity 
11.1. Policy 14 of NPF4 does not support developments that would be detrimental to the
amenity of the surrounding area. Policy 8 of LDP2 requires inter alia that developments
should be site to avoid overshadowing or overlooking. 
11.2. The Council’s Environmental Health Officer highlights the potential noise impacts that
could arise through the construction of the development. Construction inevitably results
in disturbance, vibration, noise, and dust which can adversely impact upon the amenity
of nearby residents. It is therefore recommended that construction hours are restricted by
planning condition to protect the amenity of the area in terms of a noise nuisance. A
planning condition is also required to restrict the operating noise level of the proposed air
source heat pumps to be installed. 
11.3. The proposal is sited with good distances from neighbouring residential dwellings and
therefore the proposal does not give rise to any impacts on neighbouring amenity by way
of overlooking, overshadowing, loss of light or privacy. The proposed use is accepted as
being compatible with the surrounding land uses by way of its inclusion as an allocation
within the LDP2. The internal housing arrangement of the scheme has been designed to
ensure that the amenity of the new occupants will not be adversely affected. 
11.4. On this basis, the proposal is considered to comply with Policy 14 of NPF4 and Policy
8 of LDP2. 
Page 44

Page 45

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
COMMITTEE REPORT
APPENDIX B – RELATIVE TO APPLICATION NUMBER:  22/00680/PP 
LIST OF CONTRIBUTORS 
Contributor
Name
Contributor Address Date
response
received
1 Miss Kirsty
Morrison
Ard Na Dail Upper Lochgair Lochgair
Lochgilphead Argyll And Bute
23.05.2022 
2 Mr Michael Reid Westhome Gallanach Lochgair
Lochgilphead Argyll And Bute
29.05.2022 
3 Bill Connor No Address Provided     31.05.2022
4 Michael Cuthbert Knock Steading Upper Lochgair
Lochgair Lochgilphead
26.05.2022 
5 Marion Quinn An Airigh Upper Lochgair Lochgair
Lochgilphead
27.05.2022 
6 Allan Redpath Knock Farmhouse Upper Lochgair
Lochgair Lochgilphead
26.05.2022 
7 Mr Gordon
Merrilees
Ionad Socair Upper Lochgair Lochgair
Lochgilphead
26.05.2022 
8 Beverly Cuthbert Knock Steading Upper Lochgair
Lochgair Lochgilphead
27.05.2022 
9 Margaret Gray Bruachan Lochgair Lochgilphead
Argyll And Bute
27.05.2022 
10 David Dunlop Birkhill Lochgair PA31 8SD   27.05.2022
11 Mrs Anna
Watkiss
Orran Upper Lochgair Lochgair
Lochgilphead Argyll And Bute
31.05.2022 
12 H Rogan Lochgair 26.05.2022
13 Will Rudd Melford Cottage Lochgair    26.05.2022 
14 Margaret Rudd Melford Cottage Lochgair    26.05.2022
15 Dee Carrick 4 Upper Lochgair Lochgair Argyll And
Bute  
26.05.2022 
16 Yvonne
Oldfieldnt
1 Gallanach Lochgair Lochgilphead
Argyll
26.05.2022 
17 Mr Douglas
Murray
Redhouses Lochgair Lochgilphead
Argyll And Bute
26.05.2022 
18 Wanda Dunlop Birkhill Lochgair PA31 8SD   27.05.2022
19 Greg Neeson An-Airigh Lochgair    27.05.2022 
20 Alison Wilkinson No Address Provided.     27.05.2022
21 David Wilkinson Cowal View Lochgair PA31 8SB 27.05.2022
22 Mrs Susan
Grocock
Bruadair Inverliever Ford
Lochgilphead Argyll And Bute
29.05.2022 
23 Ms Isabel Brodie 10 Gryffe Castle Kilmacolm Road
Bridge of Weir PA11 3PU
30.05.2022 
24 P Gush  1, Gallanach, Lochgair, Lochgilphead,
Argyll
30.05.2022
25 Janice Williams Marden Lochgair PA31 8SD   30.05.2022
26 Carol Braidwood 2 Upper Lochgair Lochgair PA31 8SB   30.05.2022
27 Ken Hayes No Address Provided     30.05.2022
Page 45

Page 46

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
28 Mrs Victoria
Fraser
Asknish House Lochgair
Lochgilphead Argyll And Bute
30.05.2022 
29 Sandra
Richardson
The Sheiling Lochgair Lochgilphead
Argyll And Bute
31.05.2022 
30 Mr Brian
Johnstone
Fascadale Lochgair Lochgilphead
Argyll And Bute
18.05.2022 
31 Marion Lacey Westcroft Lochgair Lochgilphead
Argyll And Bute
25.05.2022 
32 Robert Lacey Westcroft Lochgair Lochgilphead
Argyll And Bute
25.05.2022 
33 Mr Fred Bruce Waterford Lochgair Lochgilphead
Argyll And Bute
30.05.2022 
34 Karen Connor No Address Provided     30.05.2022 
35 Barbara Service No Address Provided     30.05.2022 
36 Alex Carrick 4 Upper Lochgair Lochgair Argyll And
Bute  
27.05.2022 
37 Jean C Smith 6 Gallanach Lochgair PA31 8SD   27.05.2022 
38 Cllr Dougie
Philand
Argyll First 32 Fernoch Crescent 
Lochgilphead Argyll  
28.06.2022 
39 Barabel Mckay 1 Ardcastle View Lochgair PA31 8UJ   30.05.2022 
40 Tom Mckay 1 Ardcastle View Lochgair PA31 8UJ   30.05.2022 
41 Michael Cuthbert Knock Steading,  Lochgair  PA31 8SB    30.05.2022 
Page 46

Page 47

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
APPENDIX C: EIA SCREENING REPORT 
TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT)
(SCOTLAND) REGULATIONS 2017 
SCREENING OPINION OF ARGYLL AND BUTE COUNCIL 
22/00680/PP | ERECTION OF 8 DWELLINGHOUSES AND FORMATION OF VEHICULAR
ACCESS | LAND EAST OF KNOCK FARMHOUSE, UPPER LOCHGAIR, ARGYLL AND
BUTE 
Under the provisions of Regulation 11 of the Town and Country Planning (Environmental
Impact Assessment) (Scotland) Regulations 2017, Argyll and Bute Council as Planning
Authority must adopt a screening opinion where an application before them is a Schedule 2
application of the Regulations. 
Development falling within Schedule 1 of the Regulations will always be EIA development for
which an EIAR is required to accompany an application for development consent. 
The development proposed in this case is Schedule 2 development by virtue of being identified
in Schedule 2, 10(b) which has a 0.5ha site area threshold and relates to “urban development
projects, including the construction of shopping centres and car parks, sport stadiums, leisure
centres and multiplex cinemas”. Development falling within Schedule 2 (as in this case) may
be EIA development if the development proposed is assessed to be ‘likely to have significant
effects on the environment by virtue of factors such as its nature, size or location’. 
In making such a decision, regard shall be had to the ‘selection criteria’ set out in Schedule 3,
namely the characteristics of the development, the location of the development and the
characteristics of the potential impact. 
1. Characteristics of development
The characteristics of development must be considered having regard, in particular, to—
a) the size and design of the development;
b) cumulation with other existing development and/or approved development;
c) the use of natural resources, in particular land, soil, water and biodiversity;
d) the production of waste;
e) pollution and nuisances;
f) the risk of major accidents and/or disasters which are relevant to the project concerned,
including those caused by climate change, in accordance with scientific knowledge;
g) the risks to human health (for example due to water contamination or air pollution). 
In respect of the above it is considered that the following evaluation is appropriate: 
The proposal will have potential environmental consequences in terms of building activity and
potential noise disturbance to the local community during the construction phase of the
development. However, these are normally associated consequences of new residential
development, and if properly managed in respect of appropriate controls on working hours,
noise limits and traffic management through the use of planning conditions, such matters
should not give rise to significant environmental consequences which would require the
production of an EIA. 
In respect of waste, a waste management plan and conditions in respect of the management
of waste during and post construction is considered to be an appropriate approach and no
waste products which would require specific treatment and known to exist on the site. 
Page 47

Page 48

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
The site is accessible by a range of transport modes. There are public bus links within
Lochgair. Any pedestrian connectivity to the village can be considered as part of the planning
application. 
No complex or significant issues in respect of 1(a-g) which suggest an EIA is required. No
significant environmental issues are therefore considered to arise as a result of this proposal
which are not considered to be capable of being addressed in sufficient detail within the
context of a detailed planning application. 
2. Location of development 
The environmental sensitivity of geographical areas likely to be affected by development
must be considered having regard, in particular, to—
a) the existing and approved land use;
b) the relative abundance, availability, quality and regenerative capacity of natural resources
(including soil, land, water and biodiversity) in the area and its underground;
c) the absorption capacity of the natural environment, paying particular attention to the
following areas—
a. wetlands, riparian areas, river mouths;
b. coastal zones and the marine environment;
c. mountain and forest areas;
d. nature reserves and parks;
e. European sites and other areas classified or protected under national legislation;
f. areas in which there has already been a failure to meet the environmental quality
standards, laid down in Union legislation and relevant to the project, or in which it is
considered that there is such a failure;
g. densely populated areas;
h. landscapes and sites of historical, cultural or archaeological significance. 
In respect of the above it is considered that the following evaluation is appropriate: 
The development, in terms of scale and location, accords with the adopted Local Development
Plan 2 (2024) land use allocation policy 01 and the site is located within an identified settlement
area. The site forms part of housing allocation site H3029 and is within the suggested housing
units figure. 
The site is not located within a designated site, nor would it impact on any landscape or sites
of historical, cultural or architectural significance. The site relates to agricultural land which
does not form prime agricultural land and does not include high quality peatland habitat. 
The site itself is an agricultural site that currently is utilised for grazing and has little complex
biodiversity or ecological value. 
The application includes a considered landscaping scheme to encourage biodiversity
enhancement of the site. The imposition of planning conditions can ensure that the biodiversity
enhancement is suitable for the site. 
There are no identified sensitive designated areas likely to be adversely impacted by the
proposal. Any impacts associated with its construction and operation are considered to be
capable of evaluation/resolution through the normal planning process. 
It is not considered that the proposal will have any likely significant effects on landscapes or
sites of historical, cultural or archaeological significance as none are identified either on or
Page 48

Page 49

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
adjacent to the site and the proper design and landscaping of the proposal will ensure that an
acceptable landscape “fit” is achieved through the normal process of a planning application. 
No complex or significant environmental issues in respect of 2 (a), (b) and (c) (i-viii) are
considered to arise as a result of this proposal. All identified and relevant matters are
considered to be capable of being addressed in sufficient detail the context of a detailed
planning application. 
3. Characteristics of the potential impact 
The likely significant effects of the development on the environment must be considered in
relation to criteria set out in paragraphs 1 and 2 above, with regard to the impact of the
development on the factors specified in regulation 4(3), taking into account—
a) the magnitude and spatial extent of the impact (for example geographical area and size
of the population likely to be affected); 
b) the nature of the impact;
c) the transboundary nature of the impact;
d) the intensity and complexity of the impact;
e) the probability of the impact;
f) the expected onset, duration, frequency and reversibility of the impact;
g) the cumulation of the impact with the impact of other existing and/or approved
development;
h)  the possibility of effectively reducing the impact. 
The potential impacts of the proposal on the site and surrounding area have to be assessed
by Officers in terms of the extent, trans-boundary nature, magnitude and complexity,
probability and duration, frequency and reversibility.   
The impact of the development is likely to be localised and would not have a wider
environmental impact beyond the site.  There is little potential for a trans-boundary impact or
impacts with magnitude and complexity.  There are no impacts to be considered in terms of
probability and duration, frequency and reversibility.   Overall, it is not considered that the
characteristics of the potential impact are likely to have a likely significant long-term effect
upon the local or wider environment. 
There will undoubtedly be impact on existing residents associated with noise and disturbance
connected construction of the proposed houses. However, through the requirement of
appropriate controls in respect of hours of working it is considered that such impacts as arise
can be appropriately managed and controlled through the planning application process. 
No complex or significant EIA issues in respect of 3(a-h) are considered to arise as a result of
this which are not considered to be capable of being addressed in sufficient detail within the
context of a detailed planning application outside of the EIA assessment process. 
Conclusion 
Accordingly, for the reasons set out above, and under the powers conferred by Regulation 6
of the Environmental Impact (Scotland) Regulations 2017, Argyll and Bute Council confirms
that the development, although falling within Schedule 2 Part 10(b) is not of a type or nature
to require the submission of an Environmental Impact Assessment. 
Laura MacDonald
Planning Officer
On behalf of Argyll and Bute Council 
13/01/2025
Page 49

Page 50

This page is intentionally left blank

Page 51

"
"
© Crown Copyright and database right 2024
All rights reserved. OS license (customer) account number AC0000849384
Location Plan Relative to: 22/00680/PP
O
1:2,500
0 20 4010 Meters
Application Site
Page 51

Page 52

This page is intentionally left blank

Page 53

LDP2 format template Nov 2023 
Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle 
Reference No: 24/01381/MFF
Planning Hierarchy: Local Application
Applicant: Mowi Scotland
Proposal: Replace existing 10 x 120m circumference pens with 6 x 160m
circumference pens (with a parallel minor relocation into deeper
water moving the Carradale South site centre 99m east) and siting
of existing feed barge in a different location
Site Address:  Carradale South Fish Farm, Kilbrannan Sound, Argyll and Bute    
DECISION ROUTE 
☐Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
☒Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission
• Modification of existing pens 10 x 120m circumference to 6 pens 8 x
160m circumference pens in a 120 m x 120 m mooring grid matrix, held
in two linear rows of 4 pens;
• Installation of pole mounted top nets;
• Minor relocation of the existing and installed 600 tonne feed barge 
(ii) Other specified operations
• Navigational lighting in accordance with the requirements of the NLB.
• Biomass of 2,500 tonnes 
(B) RECOMMENDATION: 
It is recommended that: 
Planning permission be approved subject to the conditions and reasons appended to the
report. 
(C) CONSULTATIONS:   
Marine Directorate of the Scottish Government (dated 7.11.24): The two pen groups at
Carradale North and South are registered as one site with Scottish Ministers in the
applicant’s aquaculture production business authorisation. Therefore, the Fish Health
Page 53 Agenda Item 5

Page 54

LDP2 format template Nov 2023 
Inspectorate (FHI) have considered these concurrent applications together and provide
combined comments for these applications (ref: 24/01381/MFF and 24/01382/MFF). 
Summary of information required
• Confirmation of net depth
• Details of the practical time taken to perform physical treatments on the modified
site
• Details of the permitted quantities of chemotherapeutants on the South pen group
and the practical time taken to conduct these treatments 
Marine Directorate of the Scottish Government (dated 11.12.24): Having reviewed
the further information submitted by the applicant on 03/12/2024 the following comments
are made: 
Confirmation of net depth
Depth of net sidewalls is confirmed as 12m for inside pens and 15m for outside row of
pens. This is satisfactory for an acceptable stocking density level of below 22kg/m3.
Details of the practical time taken to perform physical treatments on the modified site -
The FLS system can treat 3x 160m pens per day, so could complete treatment of each
pen group in 2 days and the whole site in 4 days. 
Details of the permitted quantities of chemotherapeutants on the South pen group and
the practical time taken to conduct these treatments 
The revision to the permitted quantities of bath chemotherapeutants in the new CAR
licence application would allow bath treatments of azamethiphos to be undertaken on
the North or South pen group at a rate of 1 pen/day equating to 6 days for each full pen
group. It is noted that the pen groups may not discharge azamethiphos at the same
time, therefore should treatment of both pen groups be required for the whole site this
would take 12 days. Consented levels for the in-feed treatment emamectin benzoate
allows one use per cycle on each of the North and South pen groups at maximum
biomass or more frequent uses earlier in cycle when biomass is lower, as it has been
utilised in this manner in recent production cycles. 
Sea lice efficacy  
The CAR licences for both sites permit sufficient quantities of Azamethiphos and
Deltamethrin to allow the treatment of each site within 6 days and 3 days respectively
with tarpaulin treatments. The applicant has indicated that the Modelled Maximum
Quantity of the in-feed treatment Emamectin benzoate (SLICE) is sufficient for a single
treatment at maximum biomass (at each site). 
Given the exposed location of the site, there are concerns over the welfare of young fish
being stocked on site and their ability to withstand the currents and environmental
conditions experienced on site. It is noted the applicant state that larger smolts will be
stocked onto the site; the production plan details that the average size of smolts being
stocked will be 164g, with a production cycle of up to 18 months. Details of the
considerations made on the suitability of the site for fish of this size whilst ensuring any
impacts to welfare are mitigated against should be provided. This information may be
included in the Veterinary Health and Welfare Plan which is referenced but not provided. 
No further information required. 
Scottish Environmental Protection Agency (dated 29.10.24): We have no objection
to the proposed development from a planning perspective. We can confirm that we have
already authorised the change under CAR.
Page 54

Page 55

LDP2 format template Nov 2023 
Argyll and District Salmon Fishery Board (dated 24.10.24):   Our consultation
response to the application is made in respect to the importance of populations of Atlantic
salmon present in the rivers of Kintyre and Isle of Arran, and several smaller coastal
rivers that also support populations of sea trout which support active recreational
fisheries, local employment, and economy. 
Our primary interest remains the reduction of pressure on wild salmonids from sea lice
and escaped farm fish, and we broadly support innovation in the aquaculture sector to
develop production methodologies which can mitigate for impacts on wild fish. In
principle, Argyll DSFB have no objection to the change in fish pen sizes. However, on
the premise that the potential failure in containment in one of the six larger cages
proposed may pose some increased risk of interactions with wild fish populations given
that a higher number of post-smolt salmon will be held in fewer, but larger pens. We also
note and appreciate the measures described in the escapes contingency plan provided
with the application which detail measures to reduce the potential for escapes of farm
stock to occur. We are, however, mindful that escapes of farm fish remain a possibility
as there has been a significant escape of farm fish from this site in recent years. We
appreciate the most recent equipment designs may improve containment measures but
the risk to wild salmon populations remains. We are, however, mindful that escapes of
farm fish remain a possibility and that we need to be assured that the containment
measures put in place are sufficient to protect local wild salmon populations over time.
To this end we ask that a regular programme of genetic surveillance of local wild salmon
populations is undertaken over the lifetime of the farm. This programme of genetic
monitoring should be capable of identifying any introgression of escapee farm salmon
with wild salmon populations in the area. Argyll DSFB, expect such a programme of
surveillance to be embedded within an Environment Monitoring Plan (EMP). 
In summary, Argyll DSFB has no objection to the proposed change in fish pen size at the
Carradale farm site in the understanding that an EMP that monitors the genetic health of
wild salmon populations in the Awe Fisheries District is a condition of any change in the
planning permission. 
Argyll Fisheries Trust: No response. 
NatureScot (dated 15.10.2024): Confirmed no comments. 
Historic Environment Scotland (dated 30.10.24): Confirm that there are no marine or
terrestrial heritage assets within statutory remit within the development site boundary or
within its vicinity. No comments. 
West Highland Anchorages and Moorings Association (WHAM) (15.10.2024): no
comment. 
Northern Lighthouse Board (dated 18.10.24): Consultation response includes details
of lighting and marking requirements. 
Royal Yachting Association (dated 30.10.24): RYA Scotland has no objection to this
application. However, it is noted that the outer perimeter of the farm will extend 85 m
further east into the busy Kilbrannan Sound. It will be important to ensure that this
expansion is widely publicised including through an update to the Clyde volume of the
Clyde Cruising Club Sailing Directions and Anchorages book and that care is taken to
ensure that the lights are well maintained at all times as a failure could have unfortunate
consequences in conditions of poor visibility. 
Page 55

Page 56

LDP2 format template Nov 2023 
Marine and Coastal Development Policy Officer (dated 18.11.24): There is no
objection to the proposed changes at Carradale South fish farm. In terms of possible
containment failure, I do however agree with the Argyll District Salmon Fisheries Board
(ADSFB) in that it will be important for the Applicant to monitor the genetic health of local
wild salmon populations through a programme of genetic surveillance. This should be
stipulated within the Applicant’s Environmental Monitoring Plan (EMP). 
Planning conditions to be applied to the Carradale South Fish Farm
1. The Applicant is asked to submit their EMP.
2. The Applicant will not use Acoustic Deterrent Devices (ADDs). If ADDs are
proposed at the site at any time in the future, the Applicant must apply for a
European Protected Species Licence from the Scottish Government Marine
Directorate - Licensing Operations Team (MD-LOT); including immediate
notification and an ADD usage report with daily logs to be communicated with
NatureScot and the Planning Authority on request.
3. Daily recording of wildlife interactions (entrapment/entanglement) with the site and
the reporting of data at six-monthly intervals. The six-monthly reports are to be
communicated with NatureScot and the Planning Authority.
4. Immediate notification to NatureScot and the Planning Authority of wildlife
entrapment/entanglement, as stipulated by NatureScot.
5. To implement a monitoring programme, as stipulated by NatureScot.
6. To implement adaptive management approaches based on monitoring findings (as
agreed with NatureScot in consultation with the Planning Authority). 
Update: Having reviewed the additional supporting documentation submission from Mowi
for both planning applications: 24/01381/MFF - Carradale South Fish Farm and
24/01382/MFF - Carradale North Fish Farm, there are no further comments to add. 
Clyde Fishermen’s Association (dated 1.11.2024 & 5.11.24): On this occasion efforts
were made to inform the CFA of the plan for the extension.  MOWI also listened to
concerns and comments presented by the fishermen who attended a meeting in February
2024.  MOWI also advised of their intention to submit plans and slight alterations they
would make.  So in respect to communication in this particular project it was improved in
that dialogue did occur and we appreciated the mutual effort fishermen and MOWI made.   
However, unfortunately as an association our member feedback has been that they
would have to object to the planning applications above in the strongest possible terms. 
They feel the current arrangement is already an existing example of sharing space and
compromise which works to an extent for both parties, and this proposal would
detrimentally harm fishing unnecessarily when both sectors can continue to exist under
the current arrangements.   
The fishermen from our membership were clear at the online meeting in February 2024
that a move of the current site closer to the East and further into the deep water would
cut into the main tows of the indigenous fishing fleet who rely on this area for their
livelihoods.   This area is vital to the socio-economics of local fishing communities.  The
feedback from local fishermen is that this area is essential to fishing and could not be
lost without risking the viability of local productive fishing boats and the loss of jobs.  It is
prime fishing ground for catching fresh wild seafood. 
Whilst we appreciate MOWI have now presented a model which is reduced on their
initially proposed Eastward move, in reality even the reduced Eastward expansion in into
the deep fishing water is significantly detrimental to local fishermen, just as the original
proposal also was.  Neither new options work for local fishermen.  Local fishermen are
not simply being difficult as they currently work with a situation of compromise right now
Page 56

Page 57

LDP2 format template Nov 2023 
which is more palatable to most fishermen.  The current MOWI site initially meant a loss
of ground to local fishermen so many already feel a compromise and balance has already
been reached.   
It should be noted that many fishermen do have environmental concerns regarding
aquaculture, so a current working situation should not be underestimated in terms of its
value for local stability of relations and food production.       
Local fishermen feel the fairest compromise has already been reached previously, and
this would be that the site remains at its current location and does not extend onto another
deeper footprint in direct conflict with fishing patterns.  A continuation of the current
situation would allow both aquaculture and local fishing to continue to co-exist in the area
and work alongside in the same vicinity.   
The extension of the aquaculture site Eastward would be the expansion of one sector at
the cost of another local sector.  The CFA feel this proposal doesn’t make sense when
the current activity sites of aquaculture and wild fishing in the area currently works to
some degree for both sectors.   
We hope Argyll and Bute Council should want to maintain both of the sectors in the area
with a degree of harmony or at least good relations, not sacrifice one for the expansion
of the other if both can co-exist.  We appreciate MOWI may be disappointed if they are
not able to expand/move the site, but we must reiterate we feel a compromise has
already been reached on balancing wild fishing with aquaculture in this location which
saw local fishing curtailed a number of years ago. 
Concerns raised on the impact on local fishing tows at the proposed site as well as wider
impacts on the fishing community at Carradale Harbour and the fishing which takes place
here is an important employer of local fishermen, exporters and processors and retailers
in both Carradale, Campbeltown and well beyond.         
Applicant response to CFA (22.5.2025): We understand the concerns expressed on
spatial conflict by commercial fishing stakeholders. We also acknowledge the need to
interact with other marine users who may be impacted by fish farming, including
fishermen with a view to establishing mitigation that allows the shared use of the marine
space, avoiding and minimising potential displacement effects. We have focussed on
establishing design mitigation to ensure that the proposed mooring areas have the
minimum spatial footprint whilst maintaining structural integrity to ensure containment at
the farms. Through the design of the development proposals, we have worked to reduce
the overall extent of the mooring areas, whilst ensuring that the mooring systems meet
all required technical design standards and is capable of withstanding the physical
characteristics of the development locations. There is no recognised single data source
for establishing a locational baseline of commercial fishing activity, and there remains
data uncertainty on frequency and intensity of fishing activity, however the information
provided by the CFA on local fishing activity allowed for further modelling analysis and
reduction of the moorings systems for each of the development locations. 
A reduction in the fish farm moorings area, from that presented in the respective planning
applications is now proposed for both developments. A more detailed breakdown of the
iterative changes in the extent of the respective moorings areas through the process for
planning approval is presented below. 
Moorings Design Mitigation 
An initial, indicative moorings boundary for the Carradale fish farms was presented in the
applications for screening submitted to Argyll and Bute Council, which were subject to
Page 57

Page 58

LDP2 format template Nov 2023 
consultation. Following screening and in response to comments received from the CFA,
a consultation meeting was held with the CFA (and local members) on 2 February 2024
to discuss and understand fishing grounds and activity to the east of the fish farms. From
the information presented on fishing grounds and use there was a commitment from
Mowi to re-examine the extent of the mooring’s areas for each development with the aim
to reduce their extent. Further moorings design modelling was undertaken which
subsequently confirmed the ability to reduce the indicative moorings boundary by 250m
on the deep water, eastwards side. In addition, the moorings boundary to the west of
Carradale south was adjusted eastwards by 56m, to facilitate improved access for creel
fishermen (as informed by CFA meeting, pers. comms.) on the inshore side of the fish
farm. 
The amended moorings layout-boundaries for both Carradale North and Carradale South
fish farms were then presented with the respective planning applications. The total
development area (including moorings) for the original proposals subject to screening,
was 0.826km2 for Carradale North, and 0.818km2 for Carradale South. Following
consultation and the above revised technical moorings analysis, and as submitted for
planning approval, the extent of the mooring’s areas were reduced to 0.471km2 for
Carradale North, and 0.471km2 for Carradale South. 
Post planning applications submission and following further consultation advice from the
CFA and provision of new data on fishing use of the area to the east of the fish farms,
including fishing vessel AIS tracks, further moorings modelling was undertaken. The new
fisheries data ensured that the modelling design analysis considered the additional
fishing information (AIS tracks). The analysis focussed on the east side of the
development locations and further moorings design mitigation that would avoid or reduce
potential displacement effects from the respective developments. 
The new analysis confirmed that with a further 50m reduction to the proposed moorings
boundary to the east of both fish farms could be safely accommodated. It was also
determined that it was possible to remove the NE corner of the Carradale North moorings
boundary, and the SE corner of the Carradale South moorings boundary as further
mitigation aimed at maintaining as much access as possible to the fish grounds to the
east of the fish farms. Following the refined technical moorings analysis, the extent of the
respective moorings’ areas for both development proposals have been further reduced
to 0.410 km2, a reduction of 13% compared to moorings area presented in the planning
applications. A comparison of the mooring areas for the current operational fish farms vs
proposed development is presented below: 
Moorings area – current 120m
pens
Moorings area – proposed
160m pens
Carradale North 0.330 km2  0.410 km2
Carradale South 0.405 km2  0.410 km2 
We would estimate approximately 95% of the supplied AIS (fishing vessel) tracks are
now out with the proposed mooring development areas and any potential displacement
effect would be minor compared to the present baseline position, with two operational
fish farms in place. A site plan showing the revised moorings areas for both development
proposal with geo referenced AIS fishing vessel tracks is annexed to this response
(Annex 1). This document should be treated as Confidential and be detached from this
response as it contains commercially sensitive information on fishing grounds. An
amended Moorings Technical Analysis Report is annexed as a separate document to
this response (Annex 2). The report details the inputs and results from a full technical
dynamic analysis for the revised pen and mooring system design, confirming compliance
with applicable equipment design requirements. 
Page 58

Page 59

LDP2 format template Nov 2023 
Operational Mitigation 
In addition to embedded design mitigation to prevent conflict with commercial fishing
Mowi can also commit to a series of operational mitigation measures. 
1. Following site installation, the installed mooring anchor coordinates will be shared with
local fishing vessels/CFA and the relevant fisheries representative bodies to allow bottom
trawling to be undertaken as close to the mooring infrastructure as safely possible. 
2. If appropriate and subject to other navigational considerations and approvals Mowi is
content to provide for enhanced navigational markers for the anchor locations to the east
of the fish farms to develop a safe transit-trawling corridor past the sites. 
3. Following installation, the majority of the area taken up by the mooring lines for each
development proposal will still be accessible for static gear fishing with full exclusion only
required during maintenance of mooring lines or boat operations. Mowi would be willing
to work with potting (creeling) vessels to allow and mark safe access and deployment of
creels within the mooring’s footprint of the development sites. 
4. Mowi would be willing to work with the CFA to improve communications and liaison
with local commercial fishing vessels on farming operations and activities (such as
equipment installation) and to provide a mechanism whereby areas of conflict could be
discussed and resolved. If deemed appropriate we would be willing to work with the
planning authority to find suitable wording to capture this as a condition on any planning
decisions. 
Conclusion 
Through a detailed and exhaustive design process for the mooring systems for each
development, it has been possible to reduce the length of individual mooring lines to
ensure the mooring areas have the minimum footprint. 
• The extent of the mooring’s areas presented in the planning applications were
0.471km2 for Carradale North, and similarly 0.471km2 for Carradale South. 
• Following the revised technical moorings analysis, the extent of the respective
moorings’ areas have been reduced (from planning application details) to 0.410
km2 (13% reduction) for both proposed development sites (Carradale North and
Carradale South fish farms). 
• While the focus of our attention has been developing embedded site design
mitigation to allow continued access to fishing grounds and avoid (or reduce)
displacement effects to commercial fishing there are also a number of
operational mitigations measures we can implement to promote and facilitate
fishing with and in close proximity to the site. In particular we would seek to
build on the effective working relationship established through this process with
the CFA and extend this to the establishment of better local engagement forums
with commercial fishing interests in Kilbrannan Sound. 
We understand the frustration and concerns of commercial fishermen on spatial squeeze
of accessible fishing grounds. Aquaculture has shared concerns on the threats of
cumulating pressures on use of shared marine spaces, and we have tried to limit our use
of the marine environment at Carradale to ensure we avoid (or minimise) the potential
for displacement effects, supporting the principle of mutual co-existence with commercial
fishermen. 
Next Steps 
It is intention to proceed with a formal amendment to the planning applications on to
revise the mooring areas in accordance with the above. The requisite amended
application forms and associated updated supporting information, including revised plans
will be submitted in due course. Data limitations and uncertainties exist with regards to
the available evidence on the frequency and scale of fishing activity adjacent to and
Page 59

Page 60

LDP2 format template Nov 2023 
within the development areas and the extent of any potential displacement effects.
Accordingly, we are additionally considering the commission an independent desktop
review to better characterise commercial fisheries within the proposed development site.
The intention is to identify the key fisheries interests for a finer scale analysis and scope
potential interactions with the proposed development infrastructure. 
Officer comment: revised plans have been submitted following the discussions with CFA
and the results of the Technical Moorings Report. 
Update: The applicant has commissioned and submitted a further Commercial
Fisheries Impact Assessment by Poseidon (October 2025) to assess the nature and
level of fishing activity in the Kilbrannan Sound areas of the western arm of the lower
Firth of Clyde; to examine the likely spatial and temporal impacts of the farms’
redevelopment on identified fishing activities; and to provide an independent impact
assessment and suggest possible mitigation options. 
This report has concluded that the proposed site is located within the ICES rectangle
40E4 and around 10,600 t of mainly shellfish are landed from this area, worth some £25.6
million per annum over the c. 2,500 km2 of statistical rectangle 40E4. The proposed site’s
combined mooring area is just 0.82 km2 and from analysis undertaken Based on AIS
data records over a five year period (2019 – 2024) only nine (1.4%) were within the new
proposed planning boundary and four (0.3%) were within the proposed mooring
boundary. This suggests that the planning boundary is the effective westward limit of
bottom trawling this side of the Kilbrannan Sound. This is around 300 m away from the
outermost pens under the current configuration and 225 m from the outermost pens
under the proposed configuration. Based on this evidence, the proposed move to the
east will not have any significant impact on bottom trawling activities, although there will
be very little margin for error in navigation. Although not confirmed, this is also likely to
be the case for the smaller scallop dredging fishing in the same area. 
Although not verified by the AIS data (most creel boats do not have historical AIS track
records but keep private plotter records and are now having to adopt i-VMS), crab and
lobster creeling is likely to be located in the rocky, shallower water of the western inshore
part of the site. Nephrops creeling could take place in the deeper, muddier sediments to
the north and south of the pens. It is possible that some creeling takes place within the
extended proposed planning area but given that it is sandwiched between the farm
moorings to the west and the mobile gear fishing zone to the east (see the two sections
above), this is unlikely. 
Clyde Fishermen’s Association Response to Posiedon Report (14.11.2025): CFA
reiterate that as the local fishing association with over 40 fishing boats in our
membership, we represent the majority position of those vessels and their crew. We are
extremely concerned the local and national socio-economic value of coastal fisheries and
their onward benefits and place in the link of local economies is not well understood or
downplayed.  Most local fishermen in Argyll and Bute will emphasis a lot of safe and
productive ground has been lost to aquaculture in recent years, and often they feel their
businesses and perspectives are not being successfully fully heard.   
We note in the Poseidon report that a small percentage of local fishing area is to be
impacted, however in a large marine area it is often the case that an area which is under
5% of the total area could be the most productive and safest, therefore using a mitigation
metric in terms of percentage of total area lost really doesn’t make sense.  It’s the
productivity of that area and its safety which should be considered.     
Page 60

Page 61

LDP2 format template Nov 2023 
Local fishermen met with MOWI some time ago and provided fishing tracks of their
activity, some of which will be recorded on AIS and some which would not have been. 
The fishermen explained how important this area is to them in person, and the provided
tracks clearly showing creep into important fishing grounds via the proposal.  The local
fishermen feel the current aquaculture site co-existing with local fishing in the area is
already a compromise, but this change would be a step too far for loses for local fishing
boats.   
We note that the Poseidon report acknowledges their report doesn’t capture vessels not
using AIS, and this will represent a good number of local boats.  The Scottish
Government are currently looking at improved ways to monitor vessels to make sure all
activity is captured and the monitoring systems we have are more effective.  It is without
dispute that those local vessels not using AIS won’t have been factored into this
assessment at all, and so the assessment will be missing out vital detail for fishing.  Had
we a similar opportunity and resource to commission a similar style report for wild fishing
we are sure it would show a very different picture in socio-economic terms.   
We also note that the time period landings and activity the Poseidon report covers the
period of both Brexit redtape impacting catching and exporting of seafood and the covid
period.  During both of these events many fishing boats were forced to tie up or operate
in a much reduced capacity due to domestic and international market shut
down/reduction.  Indeed for periods during this timescale fishermen needed government
support via grants to survive as did many businesses.  Whilst fishing was returning to
some normality nearer the end of this period, it wouldn’t be fair to assess the socio-
economics of this period on a typical metric for the fishing sector.       
The Poseidon doesn’t touch on the value of the landings into Northern Irish ports (around
£45m total landings, some of which will be caught in the Clyde Marine Area).     
Cumulative issues are not considered in this report either.  In the Marine Area of the
Clyde we have 5 Marine Protected Areas, a weekend ban on mobile fishing, a seasonal
closed cod box, Royal Navy closed areas, numerous aquaculture sites, No Take Zones
and a number of energy cables particularly around Carradale, with more planned in the
near future.  In addition we are going to consultation shortly for Priority Marine Feature
Closures and more Marine Projected Areas and rewilding projects.   
If we want to have a vibrant sustainable fishing fleet, the boats need space to fish, and
locally this would unfortunately be another restriction they can ill afford.  Death by a
thousand small cuts for fishing shouldn’t be an option we choose if resilience and
development is an option.  We have good stock advice for the area and latent capacity
in fishing which is also a socio-economic opportunity and potential for the area which
shouldn’t be discounted.  This year ICES advised a 54% increase in nephrops alone for
the West Coast (21,654 tonnes), there is scope to develop fisheries not just in nephrops
but beyond the currently fished stocks.  Local Fishermen have set out a vision for
development for fisheries in the area which can be found on the link below in short and
long version: 
Science & Policy - Clyde Fishermen’s Trust 
We have also invested heavily in training courses and a training centre to service the
whole Clyde area for fishing, and we are doing our best to boost the socio-economics of
our local fishing sector by innovation and development, but we can only successfully
achieve this well if fishing is resilient and reflexive, we cannot always be the losing party
in respect to marine access, it will defeat the work fishermen from the Argyll and Bute
region and the Clyde region beyond are investing into a better future.   
Page 61

Page 62

LDP2 format template Nov 2023 
We also note the Poseidon report does not capture the onward value of fishing beyond. 
Fishing supports the crew on the boats and their families, but it also supports haulage,
retail and hospitality domestically and internationally, processing and exporting,
boatyards and engineers, fuel merchants, policy work, supermarkets and accreditation
companies   
Officer comment: please see assessment of commercial fisheries impacts in Section 3
of the attached Appendix A - Committee Report. 
Argyll and Bute Biodiversity Officer (dated 08.11.24):  No comments to make. 
Argyll and Bute Environmental Health (dated 4.9.24):  No comments but notes that
there may be a need to protect the amenity for nearby sensitive receptors in the locality
of the development. 
Officer comment: The applicant has committed to mitigation measures to protect
neighbouring amenity from operational noise and light and adherence to this will be
secured by planning condition. 
(D) HISTORY:   
09/00905/MFF Formation of new 14 cage fish farm including foodstore/service pontoon.
(Approved 11.11.2009) 
14/01047/MFF Alterations to existing marine fish farm by enlargement of mooring grid to
increase cage spacing, without extension of mooring area or changes in number or size of
cages (Approved 18.7.2014) 
15/01939/MFF Re-equipment of marine fish farm from 14 no. 100 metre circumference
cages to 10 no. 120 metre circumference cages and retention of feed barge (Approved
14.9.2015) 
18/01174/SCRSCO Screening and scoping request for alterations to and extension of
existing fin fish farm and increase in biomass from 2500 tonnes to 3750 tonnes (Opinion
Issued 19.7.2018) 
18/00263/PNMFF, Replacement of 400T fee barge with 650T feed barge at same location
(No objection 28.2.2018) 
19/00106/PNMFF SOUTH Installation of replacement pens and nets (PA Not required
26.7.2019) 
23/00262/SCREEN SOUTH Screening Opinion for reconfiguration of infrastructure from 10
x 120m circumference cages to 6 x 160m circumference cages with a parallel minor
relocation into deeper water (Negative Screening Opinion issued 6.4.2024) 
(E) PUBLICITY:   
ADVERT TYPE:
Regulation 20 Advert Local Application
EXPIRY DATE: 15.11.2024 
Page 62

Page 63

LDP2 format template Nov 2023 
(F) REPRESENTATIONS:   
(i) Representations received from: 
James Anderson, Office, 110 Sound Of Kintyre, Campbeltown, PA28 6GA 
A further 11 proforma objection letters have been submitted (please see Appendix B for a
list of the contributors). 
Representations are published in full on the planning application file and are available
to view via the Public Access section of the Council’s website. 
(ii) Summary of issues raised: 
• Impact on local fishermen and families
• Better areas available for expansion
• Concern about ability to influence planning decisions 
Officer response: the impact on commercial fisheries is considered in detail in Section 3 of
the attached Committee Report – Appendix A. In summary, officers consider that the
applicant has engaged proactively with the Clyde Fishermen’s Association from the
inception of the proposed project and in response to concerns raised has commissioned
detailed technical analysis to reduce the extent of the moorings area by 14%, with the
intention of minimising the impact on the local fishing industry. The applicant has also
proposed further operational mitigation measures and ongoing engagement in response to
the CFA’s sustained objection. A planning condition has been applied to support the
establishment of a local engagement/liaison forum and agree mechanisms for operational
mitigation to support the principle of co-existence with the local commercial fishing activity
in the Kilbrannan Sound.   
It is further noted that Argyll District Salmon Farming Board support the proposed change
in fish cage size and configuration on the basis that the changes will include the use of the
most robust modern cage technology and fish farm handling procedures. 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report: ☐Yes ☒No 
(ii) An Appropriate Assessment under the
Conservation (Natural Habitats) Regulations
1994:   
☐Yes ☒No 
(iii) A Design or Design/Access statement:    ☐Yes ☒No 
(iv) A Sustainability Checklist 
(with reference to the requirements of LDP2
Policy 04) 
☐Yes ☒No 
(v) A report on the impact of the proposed
development eg. Retail impact, transport
☒Yes ☐No 
Page 63

Page 64

LDP2 format template Nov 2023 
impact, noise impact, flood risk, drainage
impact etc:   
Planning Application: 
Overview (Supporting Document) including:
Annex 1 Site Plans and Charts 
Annex 2 Equipment Plans and Elevations 
Annex 3 Equipment Attestation 
Annex 4 Containment and Escapes Contingency Plan and
Moorings Technical Report 
Annex 5 Sea Lice Management, Efficacy and Attestation 
Annex 6 Waste Management Plans 
Annex 7 Predator Mitigation Plan 
Annex 8 Screening Opinion – EIA Not Required 
Annex 9 Seascape, Landscape and Visual Assessment (Munro
Landscape (02.11.2023).  
Kilbrannan Sound Environmental Management Plan (February
2024) 
Post submission:
Mowi Statement of Mitigation (12.9.2025)
Mowi Socio-economic Supporting Statement (12.9.2025)
Moorings Technical Analysis Report, Reference GFME-TR-
076, dated 18 February 2025
Commercial Fisheries impact assessment from a revised pen
layout at the Carradale fish farm – Phase 1 Report – Desktop
Evaluation (October 2025) 
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   ☐Yes ☒No 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  ☐Yes ☒No 
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
Page 64

Page 65

LDP2 format template Nov 2023 
NPF4 Policy 12 – Zero Waste 
Productive Places
NPF4 Policy 25 – Community Wealth Building
NPF4 Policy 29 – Rural Development
NPF4 Policy 32 – Aquaculture 
Argyll and Bute Local Development Plan 2 (Adopted February 2024) 
Spatial and Settlement Strategy
Policy 04 – Sustainable Development 
High Quality Places
Policy 08 – Sustainable Siting
Policy 14 – Bad Neighbour Development 
Diverse and Sustainable Economy
Policy 28 – Supporting Sustainable Aquatic and Coastal Development 
Sustainable Communities
Policy 59 – Water Quality and the Environment
Policy 63 – Waste Related Development and Waste Management 
High Quality Environment
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 74 – Development Impact of Sites International and National Importance 
(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. 
• Third Party Representations
• Consultation Reponses
• Planning History
• ABC Technical Note – Biodiversity (Feb 2017)
• ABC Landscape Studies
• Scotland’s National Marine Plan (2015) 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  ☒Yes ☐No 
The proposal is Schedule 2 development and a Negative Screening Opinion (ref:
23/00262/SCREEN) was issued by the Council on 6.4.2023.    
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  ☐Yes ☒No 
(M) Does the Council have an interest in the site:  ☐Yes ☒No 
(N) Requirement for a pre-determination hearing: ☐Yes ☒No
Page 65

Page 66

LDP2 format template Nov 2023 
In deciding whether to exercise the Council’s discretion to allow respondents to appear at
a discretionary hearing, the following are of significance: 
• How up to date the Development Plan is, the relevance of the policies to the
proposed development and whether the representations are on development plan
policy grounds which have recently been considered through the development plan
process. 
• The degree of local interest and controversy on material considerations together
with the relative size of community affected set against the relative number of
representations, and their provenance. 
The current Local Development Plan was approved in 2024.  NPF4 which was approved in
2023 contains a similar criteria-based approach in relation to aquaculture applications.  It
is considered that the development plan is up to date. 
At the time of writing this application has attracted 11 objections from local fishing boat
operators relating to conflict over fishing grounds. No objections have been raised by
statutory consultees in relation to these matters. 
Furthermore, it is noted that the site is already in operation for marine fish farming and there
will be no overall increase in biomass as a result of the proposed changes to pen sizes.
Officers consider that the relocation of Carradale North and South represents a small
percentage of the available fishing grounds and it is noted that through further discussions,
revised moorings have further reduced the impact on local fishing activity. It is further noted
that the modernisation of marine fish farming activity at this site is welcomed by statutory
consultees for benefits to fish health and the applicant has committed to ongoing
communication with local fishing boats to maintain access to dishing grounds wherever
possible. 
It is not considered that there would be merit in holding a Pre-determination Hearing as all
planning matters raised as objections have been suitably addressed through the submitted
material and/or through the use of planning conditions. It is the view of officers that a pre-
determination meeting therefore would not add value to the decision-making process in this
instance.    
(O)(i) Key Constraints/Designations Affected by the Development: 
(ii) Soils - Not applicable as this is a marine development 
(iii) Woodland - Not applicable as this is a marine development  
(iv) Land Status / LDP Settlement Strategy - Not applicable as this is a marine
development 
(P) Summary assessment and summary of determining issues and material
considerations 
This application is for a change of equipment and minor relocation of an existing
marine fish farm in the Kilbrannan Sound approximately 400m off the eastern shore
of the Kintyre Penninsula.  The proposal would replace the existing 10no 120m
Page 66

Page 67

LDP2 format template Nov 2023 
circumference pens with 6 x 160m pens in a formation of 3 x 2 along with the slight
change in the position of an existing 650 tonne feed barge which would be located
to the south of the group on the shore side.  The site would continue to be serviced
from the company’s existing shore base located at Carradale Harbour. 
The proposed development is located approximately 1.8 km north of Carradale
village on the western edge of Kilbrannan Sound and east of the Kintyre peninsula.
The smaller hamlet of Grogport lies approximately 2.6 km north west of the Site. 
There is to be no change to the consented biomass for the site. The proposal is part
of a wider 5 year project by the applicant to upgrade and modernise fish farming pens
to bring about a number of benefits:
• Improved health and safety conditions through the upgrading of equipment;
• Improved health and welfare of fish.  
• As the biomass is not increasing the density of the fish will be reduced and
fish can be treated more efficiently in fewer pens, reducing amenity impacts. 
This proposal is not EIA Development. The recommendation on this application has
been guided by the consultation responses from Scottish Government Marine
Directorate, NatureScot, SEPA, Argyll District Salmon Fishery Board, Historic
Environment Scotland, Northern Lighthouse Board, Royal Yachting Association,
Argyll and Bute Environmental Health, and the Argyll and Bute Marine and Coastal
Officer. 
Representations received have been addressed in Section F of this report (above)
and against the planning policies of the adopted Development Plan which comprises
NPF4 and LDP2 as well as other material considerations, including those relating to
marine planning (see Appendix A). 
The proposal would accord with Development Plan policy and accordingly, it is
recommended that planning permission be approved subject to conditions 
(Q) Is the proposal consistent with the Development Plan: ☒Yes ☐No 
(R) Reasons why Planning Permission or Planning Permission in Principle Should
be Granted: 
The proposal is considered to be consistent with the relevant provisions of the
Development Plan, and there are no other material considerations of sufficient
significance to indicate that it would be appropriate to withhold planning permission
having regard to s25 of the Act. 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
Not Applicable 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
☐Yes ☒No 
Page 67

Page 68

LDP2 format template Nov 2023 
Author of Report: Shelley Gould Date: 1/12/25 
Reviewing Officer: Sandra Davies Date: 1/12/25 
Fergus Murray
Head of Development & Economic Growth 
Page 68

Page 69

LDP2 format template Nov 2023 
CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 24/01381/MFF 
Standard Time Limit Condition (as defined by Regulation) 
Additional Conditions 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 3.7.2024, supporting information and, the approved drawings
listed in the table below unless the prior written approval of the Planning Authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997.  
Plan Title.  Plan Ref. No.  Version  Date
Received 
General view and location of Carradale fish
farm site location
Annex 1: Figure
1
0001 16.9.2025 
Existing site location (installed) (1:8,000)
(dated 4.10.2024)
Annex 1  16.9.2025 
Existing (installed) & Proposed site (1:8,000)
(dated 24.3.2025)
Annex 1   16.9.2025 
Proposed site (1:8,000) (dated 24.3.2025) Annex 1   16.9.2025 
Admiralty Chart Proposed site
(1:25,000) (dated 24.3.2025)
Annex 1  16.9.2025 
Proposed equipment co-ordinates Annex 1   16.9.2025 
Existing equipment co-ordinates Annex 1  16.9.2025 
Existing elevations – configuration 120m pens
in 75m matrix grid (dated 11.7.2022)
Annex 2: 
Figure 1
0001 31.7.2024
Proposed elevations - configuration 160m
pens in 100m matrix grid (dated: 2.4.2020)
Annex 2: 
Figure 2 
10.10.2024
Manufacturers Diagram - Typical Moorings
Design (dated 2.4.2020)
Annex 2: 
Figure 5
0001 31.7.2024
Manufacturers Diagram – Net Design (dated
2.4.2020)
Annex 2: 
Figure 3
0001 31.7.2024
Manufacturers Diagram – Top Net Support
Structure (dated 7.5.2021)
Annex 2: 
Figure 4
0001 31.7.2024
Manufacturers Design Specification – 160m
pen (dated 17.6.2021)
Annex 11  14.10.2024
Existing feed barge photographs (dated
October 2024)
Annex 10  14.10.2024  
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. Acoustic Deterrent Devices 
No Acoustic Deterrent Devices (ADDs) shall be deployed at the site hereby approved. 
Page 69

Page 70

LDP2 format template Nov 2023 
Reason:  In the interests of nature conservation.  This planning application has been
assessed on the basis that ADDs will not be used. The use of ADDs would be regarded
as a material change to the proposal.  
3. Biomass and Stocking 
The development hereby approved shall not be operated other than with a biomass of
2500 tonnes or less and shall only stock one species of fin fish (other than cleaner fish). 
Reason:  The environmental effects of this proposal have been assessed against this
maximum biomass of one species. 
4. Fallow Period 
There shall be a minimum of 28 days in each calendar year when the site will be fallow
and this shall be applied synchronously with the other fish farms within the Kilbrannan
Sound FMA. 
Reason:  In the interests of nature conservation.  
5 Removal of Existing Equipment 
Prior to the development hereby approved being brought into use, the redundant
equipment relating to the previous layout shall be removed from the site. 
In the event that the development or any associated equipment approved by this
permission ceases to be in operational use for a period exceeding three years, the
equipment shall be wholly removed from the site thereafter, unless otherwise agreed in
writing by the Planning Authority. 
Reason: In the interest of visual amenity and to accord with LDP2 Policy 29. 
6. Redundant Equipment/Equipment Failure 
In the event of equipment falling into disrepair or becoming damaged, adrift, stranded,
abandoned or sunk in such a manner as to cause an obstruction or danger to navigation,
the developer shall carry out or make suitable arrangements for the carrying out of all
measures necessary for lighting, buoying, raising, repairing, moving or destroying, as
appropriate, the whole or any part of the equipment. 
Reason: In the interest of visual amenity and safe navigation. 
7. Finished Surfaces 
The finished surfaces of all equipment above the water surface, excluding the feed barge,
but inclusive of the surface floats and buoys associated with the development hereby
permitted (excluding those required to comply with navigational requirements) shall be
non-reflective and finished in a dark recessive colour unless otherwise agreed in
advance in writing by the planning authority.   
Reason: In the interest of visual amenity. 
8. Lighting 
Page 70

Page 71

LDP2 format template Nov 2023 
All lighting above the water surface and not required for safe navigation purposes should
be directed downwards by shielding and be extinguished when not required for the
purpose for which it is installed on the site. 
Reason: In the interest of visual amenity and navigational safety. 
9. Noise 
The Noise Rating Level attributable to the operational activities associated with the
approved fish farm shall not exceed background noise levels by more than 3dB(A) at any
noise sensitive property measured and assessed in accordance with BS4142:2014.   
Reason: In order to protect the amenities of the area from noise nuisance. 
10.  Proactive notification of fish movement operations 
The applicant shall provide the dates of any planned fish movements utilising large
vessels in a year in advance in writing to the Planning Authority. 
Reason: In the interests of improving monitoring and reducing impacts on amenity. 
11. Hours of operation 
Except where the planning authority has been notified under the provisions of condition
10 or in situations outwith the applicant’s control (e.g. tidal conditions, fish movements
delayed by bad weather or fish health interventions); no operations, other than water
pumping, feeding, servicing, environmental monitoring and maintenance testing of
plant/equipment shall take place on site outwith the following times: 07.00 hours to 20.00
hours over 7 days. 
Reason: In the interests of amenity. 
12. Mitigating impacts of operations (including out of hours and Well Boat operations) 
All site operations including: 
• the use of equipment integral to the production cycle (e.g. underwater lighting
and aeration systems or well boats) which is required to run overnight for fish
health reasons;
• operations notified under the provisions of condition 10; and 
• any fish health interventions or delayed operations out of hours,   
shall adhere to the best practice measures detailed in the ‘Further Supporting Information
- mitigation of amenity impacts arising from operational effects’ document (submitted by
MOWI on 12.9.2025). 
All delayed or out of hours operations required to be undertaken outwith the provisions
of condition 10 shall be recorded by the applicant. A record of these out of hours activities
shall then be made available to the Planning Authority on request. 
Reason: In the interests of improving monitoring and reducing impacts on amenity. 
13. Environmental Management Plan (EMP) 
Page 71

Page 72

LDP2 format template Nov 2023 
The development site shall be operated in accordance with the submitted Environmental
Management Plan (Kilbrannan Sound EMP (8.2.24). The EMP should be reviewed and updated
if required following the adoption by Scottish Government of any new policy framework relevant
to sea lice management and wild salmonid interactions. Any proposed amendments to the EMP
shall be submitted to and approved in writing by the planning authority prior to the changes
being implemented. 
Reason: In the interests of nature conservation and protecting the environment. 
14. Waste Management Plan 
The development shall be carried out in accordance with the Carradale Waste
Management Plan dated July 2024 or as updated and agreed in writing with the Planning
Authority. 
Reason:  To ensure that waste is dealt with in a sustainable manner in accordance with
Development Plan policy. 
15.  Containment and Contingency Escapes Plan 
The development shall be carried out in accordance with the Containment and
Contingency Escapes Plan dated April 2024 or as updated and agreed in writing with
the Planning Authority. 
Reason:  to maintain the integrity of the holding structures and the measures to be
taken in the event of a suspected escape. The plan is specific to the proposed
installation of 160 m circumference pens. 
16. Sea Lice Policy Strategy and Efficacy Statement 
The development shall be carried out in accordance with the ‘Carradale Sea Lice –
Policy, Strategy and Efficacy Statement’ dated October 2024 or as updated and
agreed in writing with the Planning Authority. 
Reason:  In the interests of nature conservation. 
17. Biodiversity Enhancement Proposals 
Within 3 months of the date on this planning permission, a Biodiversity Enhancement
Strategy shall be submitted for the approval of the planning authority.  Thereafter the
applicant shall implement the proposals in line with the approved strategy and provide
updates at the request of the planning authority. 
Reason: In order to protect biodiversity, reverse biodiversity loss, deliver positive
biodiversity effects and strengthen nature networks in accordance with the
requirements of NPF 4 Policy 3. 
18. Local Fisheries Liaison 
Within three months of the date of this decision the applicant shall establish a forum
for effective operational communication with the members of the Clyde Fisheries
Association. This forum shall be used to agree and implement proposed operational
mitigation mechanisms in relation to sharing of installed mooring anchor coordinates
and the provision of enhanced navigational markers for anchor markers where
possible.
Page 72

Page 73

LDP2 format template Nov 2023 
Reason: In order to support co-existence of local fisheries and salmon farming on this
site and ensure both navigational and fish pen containment safety while maintaining
as much access to fishing grounds for creeling vessels as is reasonably practicable. 
Page 73

Page 74

LDP2 format template Nov 2023 
ADDITIONAL NOTES TO APPLICANT 
• Please see the consultation response dated 18 October 2024 from the Northern
Lighthouse Board (NLB) for the lighting and marking requirements for this site. 
• The Aquatic Animal Health (Scotland) Regulations 2009 requires the authorisation of all
Aquaculture Production Businesses (APB's) in relation to animal health requirements
for aquaculture animals and products thereof, and on the prevention and control of
certain diseases in aquatic animals.  The authorisation procedure is undertaken on
behalf of the Scottish Ministers by the Fish Health Inspectorate (FHI) at the Marine
Directorate Marine Laboratory.  To apply for authorisation for an APB or to amend details
of an existing APB or any site that an APB is authorised to operate at, you are advised
to contact the FHI as follows:  Fish Health Inspectorate, Marine Directorate Marine
Laboratory, 375 Victoria Road, Aberdeen, AB11 9DB.  Tel: 0131 244
3498;  Email:  ms.fishhealth@gov.scot 
• All marine farms, whether finfish, shellfish or algal, are required to apply for a marine
licence under Part 4 of the Marine (Scotland) Act 2010. To apply for a marine licence,
or to amend details of an existing marine licence (formally Coast Protection Act 1949 –
Section 34 consent), please visit the Scottish Government’s website at
http://www.gov.scot/Topics/marine/Licensing/marine/Applications where application
forms and guidance can be found. Alternatively you can contact the Marine Directorate
Licensing Operations Team (MD-LOT) by emailing MD.MarineLicensing@gov.scot; or
calling 0300 244 5046. 
Page 74

Page 75

LDP2 format template Nov 2023 
COMMITTEE REPORT
APPENDIX A – RELATIVE TO APPLICATION NUMBER:  24/01381/MFF 
PLANNING LAND USE AND POLICY ASSESSMENT 
1. Introduction 
1.1. The Carradale South fish farm was originally consented in 2009 with Carradale North
being consented in 2015. This application is for a change of equipment for the existing
Carradale South marine fish farm, located in the Kilbrannan Sound approximately 400m
off the eastern shore of the Kintyre Penninsula.  The proposal would replace the existing
10no 120m circumference pens with 6 x 160m pens in a formation of 3 x 2 along with
the slight change in the position of an existing 650 tonne feed barge which would be
located to the south of the group on the shore side.  The site would continue to be
serviced from the company’s existing shore base located at Carradale Harbour. 
1.2. With innovation in pen design and with improving design and capacity of support
vessels, Mowi has been upgrading pen equipment across Scotland since 2022. There
are now 11 Mowi sites operating 160m pens in Scotland with the Carradale farms being
the latest sites proposed to transition. The drivers for the developments are operational
efficiencies and establishing the conditions for improved health and welfare of farm
reared salmon. Fewer, larger pens will reduce stocking density (leading to fish health
and welfare benefits) in addition to increasing the efficacy of administering any
treatments and undertaking farm maintenance activities. No increase in fish production
levels is being sought. The applicant has submitted several applications to the Council
to upgrade operational fish farm facilities by replacing existing pens with few smaller
pens. This allows a lower stocking density without increasing biomass and has
associated benefits for health and safety and fish health. It is noted that there is no
proposed increase to the biomass for this site which is 2500 tonnes as consented
through the CARs license. A sister application has been submitted for the adjacent
Carradale North Marine Fish Farm (24/01382/MFF). The applicant has also recently
received planning permission to improve shore base facilities at Carradale Harbour
(25/00884/PP) as part of a wider generation proposal for the area. 
1.3. The proposed development is located approximately 1.8 km north of Carradale village
on the western edge of Kilbrannan Sound and east of the Kintyre peninsula. The smaller
hamlet of Grogport lies approximately 2.6 km north west of the Site. The site is not
located within any areas of local or national designation and is 2.5km from the east
Kintyre Local Landscape Area. 
2. Planning Policy 
2.1. The Development Plan for the determination of this planning application comprises
National Planning Framework 4 (NPF4), adopted February 2023, and the Argyll and
Bute Local Development Plan 2, adopted February 2024.  NPF 4 is based around six
overarching spatial principles which the proposed development should align with.  These
are:
• Just transition;
• Conserving and recycling assets; 
• Local living;
• Compact urban growth;
Page 75

Page 76

LDP2 format template Nov 2023 
• Rebalanced development;
• Rural revitalisation. 
2.2. Not all of these principles will be relevant to every development and in relation to the
current proposal it is considered that just transition, rural revitalisation, local living and
rebalanced development would apply.  In terms of rural revitalisation, NPF4 supports
development that helps retain and increase the population of rural areas in Scotland. 
2.3. The main policy which relates to aquaculture in NPF 4 is Policy 32, however, other
policies within this plan are also relevant and need to be considered in the determination
of this proposal. With regard to LDP2, Policy 28 is the main aquaculture policy, however,
there are also other relevant policies which are listed above against which the proposal
requires to be assessed. 
2.4. The proposal benefits from general support from the Scottish Government’s National
Marine Plan and from NPF4 which together recognise the contribution of the aquaculture
sector to the rural economy and which seek to support sustainable economic
development. The National Marine Plan and NPF4 both support marine fish farming
where it can take place in environmentally sustainable locations, where it does not
exceed the carrying capacity of the water body within which it is to be located, and where
it does not give rise to significant adverse effects upon nature conservation, wild fish,
historic environment or other commercial or recreational water users. 
2.5. Whilst not part of the Development Plan, the Council as a public body is required to take
authorisation decisions in accordance with the National Marine Plan (NMP) as the
proposal extends into the marine environment, unless relevant considerations indicate
otherwise.  The proposal should be consistent with general policies of the NMP
including: 
GEN 1 – General planning principle;
GEN2 – Economic benefit;
GEN 3 – Social benefit;
GEN 4 – Co-existence – requires consideration that may occur and the likely effect of
interaction between inshore commercial fisheries (loss of fishing ground) and marine
and coastal recreational activities.
GEN 5 Climate change;
GEN7 – Landscape/seascape;
GEN 9 – Natural Heritage
GEN 10 – Invasive non-native species;
GEN 11 – Marine Litter;
GEN 12 – Water Quality and Resource;
GEN 13 – Noise. 
2.6. NPF4 Policy 32 refers the National and Regional Marine Plan and notes that proposals
will be supported where they comply with the relevant plans.  The criteria noted within
the NMP policies above are also covered within the Development Plan policies. 
2.7. Beyond development plan considerations, in determining the application regard has to
be had to the Council’s Economic Development Action Plan which identifies aquaculture
as an important contributor to the local economy, and to national government economic
and sectoral policy, the stated intention of which is to seek to expand the finfish sector
substantially to meet internal and export demands and to help sustain direct and indirect
employment in rural areas.   
Page 76

Page 77

LDP2 format template Nov 2023 
2.8. In addition, one of the proposals contained within the Rural Growth Deal for Argyll and
Bute relates to a vision for Argyll and Bute to be the leading region for innovation in
marine aquaculture in Scotland, UK and globally, by underpinning sustainable, inclusive
business growth through investment in world class marine science and technology.  This
includes a commitment to a Marine Industry Needs Assessment. This study will provide
the evidence base for industry needs to inform future investment outcomes and the
potential options available to deliver these outcomes. This will assist in identifying the
key priorities for Rural Growth Deal investment and where this should be targeted to
support sustainable growth of this sector and set out in the business case for
consideration and approval by Scottish Government. 
3. Assessment Against Policy Criteria 
3.1. NPF Policy 32 relates specifically to aquaculture.  It aims to encourage, promote and
facilitate aquaculture development whilst minimising adverse effects on the
environment.  The policy outcomes sought from this policy are: 
• new aquaculture development is in locations that reflect industry needs and
considers environmental impacts;
• producers will contribute to communities and local economies;
• prosperous finfish, shellfish and seaweed sectors;
• migratory fish species are safeguarded. 
3.2. In terms of the spatial strategy Policy 32 does not support development in the north and
east coast of mainland Scotland.  This is in order to safeguard migratory fish species. 
3.3. Point (C) of Policy 32 requires consideration of the operational impacts of fish farms and
specifically cites a number of criteria which require to be considered.  These criteria are
also reflected in the Council’s LDP2 which was adopted in February 2024. 
3.4. The proposal requires to be assessed against all of the relevant policies contained within
the development plan and not just the aquaculture specific ones.  There are some
parallels between the requirements of the aquaculture policies and other policies within
the development plan and these will be highlighted in the assessment of this application. 
The application will be assessed against the criteria from LDP2 Policy 28 below with
other relevant policies from NPF4 and LDP2 referred to where they would apply. 
Landscape / coastal character, seascape or visual amenity (including Isolated Coast,
Wild Land and National Scenic Areas) 
3.5. The applicant has submitted a Landscape, Seascape, Visual Impact Assessment for the
Carradale Fish Farm Proposed Replacement Pens carried out by Munro Landscape
(02.11.2023).  The appraisal evaluates the landscape and visual effects the proposed
modifications to the Carradale North and Carradale South sites to replace the 20 existing
120m circumference fish pens with 12 160m circumference fish pens with a slight
relocation to the east towards deeper water which will see the Carradale North pen grid
move approximately 129m and Carradale South move 149m. The Proposed Development
would be located within Seascape Character Area 10 - Lower Firth of Clyde (west) and
adjacent to the Upland Forest Moor Mosaic Landscape Character Type.  The baseline
studies confirmed that the Proposed Development would not be located within a
designated landscape however the North Arran NSA is located 2.7 km to the east and the
East Kintyre APQ lies 2.0 km to the south of the proposed location. 
Page 77

Page 78

LDP2 format template Nov 2023 
3.6. The appraisal provides a comparative Zone of Theoretical Visibility (ZTV) illustrating the
‘change’ in visibility resulting from the change in the location of the pens. Within 5 km of
the Proposed Development the ZTVs indicates a very narrow band of visibility on Kintyre,
with views largely constrained to the eastern slopes and shoreline. Notable
locations/receptors with theoretical visibility include the village of Carradale, and the B842
between Cour and Grogport. Visibility is also predicted from short sections of the Kintyre
Way and from the summit of Cnoc nan Gabhar (Deer Hill). To the east, from landfall
locations on Arran, visibility is indicated as occurring from the coastline and western
slopes of the island, notably between Imachar and Whitefarland Point (including the C147
and Arran Coastal Way). Open views from offshore locations across the study area within
the Kilbrannan Sound are indicated as occurring. These views of the Proposed
Development are predicted to be very similar in extent to the existing Carradale North and
South Fish Farms and add only very small areas of new visibility of the fish pens. 
3.7. The submitted SLVIA concludes that resulting effects on landscape character associated
with the replacement, and minor relocation of the fish pens would result in, at most,
negligible effects on the character of the seascape and landscape. These effects are not
significant and ultimately reversible. There would also be no significant effects on
landscape designations within the study area to the Proposed Development, including the
North Arran NSA and the East Kintyre APQ. Effects on all designations within the study
area resulting from the Proposed Development would be at most negligible. These effects
are ultimately reversible. The SLVIA concludes: During the operational phase there would
be no direct effects on landscape features or elements which define landscape character
types or contribute to the special qualities of landscape designations. All effects on
landscape character types and designations would be indirect and non-significant in
nature only, the assessment determining that in comparison with the existing fish pens
the level of effect would be negligible. The level of effect on Lower Firth of Clyde (west)
SCA would also be negligible.” 
3.8. In terms of visual effects, 5 viewpoints were selected to aid the assessment of this issue. 
The viewpoints and the reason for their selection are noted in the table below: 
View
point
number
Viewpoint Name Reason for selection Distance to the
Proposed
Development
1 B842 north of
Grogport 
The viewpoint is representative of
the views available for road users
of the B842 road, and cyclists on
the NCR 78, north of Grogport, at
a promoted picnic are within the
Plateau Moor and Forest LCT 39,
and the Port Raoin Mhor to Sgeir
Bhuidhe Seascape Character
Area within the Lower Firth of
Clyde (West) Seascape
Character Area 10. 
3km
2 Cnoc nan Gabhar
(Deer Hill) 
The viewpoint is representative of
the views available for
recreational receptors at a hill top
location, within the Plateau Moor
and Forest LCT 39.
1.9km
3 Culcreuch Road,
Carradale 
The viewpoint is representative of
the views available for residential
2.2 km
Page 78

Page 79

LDP2 format template Nov 2023 
receptors, on Culcreuch Road,
Carradale within the Coastal
Glens LCT 36, and the Port na
Cuile to Port Raoin Mhor
Seascape Character Area within
the Lower Firth of Clyde (West)
Seascape Character Area 10.
The viewpoint is located within
the Area of Panoramic Quality
(LLA). 
4 Carradale Harbour  The viewpoint is representative of
the views available for
recreational receptors at Port
Crannaich, Carradale Pier, within
the Coastal Glens LCT 36, and
the Port na Cuile to Port Raoin
Mhor Seascape Character Area
within the Lower Firth of Clyde
(West) Seascape Character Area
10. The viewpoint is located
within the Area of Panoramic
Quality (LLA).
2.2km
5 Imachar Point, Arran The viewpoint is representative of
the views available for
recreational receptors on the
Arran Coastal Way, south of
Imachar, within the Raised Beach
Coast and Cliffs LCT 59, and the
Loch Ranza to South Machrie
Bay Seascape Character Area
within the Lower Firth of Clyde
(West) Seascape Character Area
10. The viewpoint is located
within the North Arran National
Scenic Area and Special
Landscape Area. 
4.7km 
3.9. In consideration of the degree of change to the existing view that the Proposed
Development would constitute the predicted magnitude of change arising from the
Proposed Development would be negligible. The visual effects on visual amenity
experienced by people in Carradale would be negligible, non-significant, long-term
(reversible) and adverse. 
3.10. Visual impacts on tourists, or those participating in recreation activities, may be brief
in nature by passing through the area on boat, ferry, horse, foot, bike or kayak, their
sensitivity to landscape and visual change is high because their purpose/activity is to
appreciate landscape and surroundings. The visual assessment has considered views
from recreational receptors within 10 km of the Development focusing on those within 5
km radius of the Proposed Development within the detailed study area. Nearby recreation
receptors within the detailed study area of the Development include the National Cycle
Route NCN 78 and the Kintyre Way long distance footpath on Kintyre. On Arran, the Arran
Coastal Way falls within the detailed study area where it passes close to Imachar. 
Page 79

Page 80

LDP2 format template Nov 2023 
3.11. The visual assessment has also considered the potential visual effects likely to be
experienced by people travelling through the landscape on the local road network. Views
will vary depending on proximity to the road, the mode of transport, the angle of view, and
intervening landscape features. Potential visual receptors falling within the detailed study
area included residents, including those in the village of Carradale and the hamlet of
Grogport, in addition to users of the B842 on Kintyre and C147 on the Isle of Arran.
Recreational routes falling within the study area include the Kintyre Way, the Arran
Coastal Way and National Cycle Route 78. A number of core paths were also identified,
these principally comprising a network of paths around Carradale but also forming
sections of the Kintyre Way or following the B842. There are also a number of Core Paths
within the Study Area, and the following have been identified as wholly or partially falling
within the detailed study area: 
• C094(b) – Tayinloan – Carradale East West Link; 
• C093(b) - Carradale Forest circular; 
• C403 - Port na Cuile - Seneval Wood, Carradale; 
• C097(b) - Carradale Bay circular; 
• C088(c) - Campbeltown to Cloanaig 
• AR81 – Coirein Lochan. 
3.12. For visual receptors, the Proposed Development, predominantly as a result of the very
minor relocation of the pens to the east but also as a result of changes to the size and
number of pens, would very slightly change the views people experience. In comparison
to the views of the existing pens, the Proposed Development would result in a negligible
effect in views from Carradale and no effect from Grogport. In views from transport and
recreational routes, both on Kintyre and the Isle of Arran, the Proposed Development
would similarly result in a negligible effect on visual amenity. In all cases these effects
would be non-significant and reversible. 
3.13. In conclusion, there would be no significant seascape, landscape effects and visual
effects arising as a result of the Proposed Development in comparison to the degree of
change associated with the replacement pens and the existing fish pens to Carradale
North and South. It is concluded that the Proposed Development would not result in
significant effects on landscape / seascape character and visual amenity. 
3.14. The proposal would therefore be in accordance with aquaculture policies 32 d (i)
(NPF4), Policy 28 – Supporting Sustainable Aquatic and Coastal Development, LDP2
Policy 4 – Sustainable Development and LDP2 Policy 8 – Sustainable Siting. 
The natural, built and / or historic or archaeological sites and their settings 
3.15. In terms of Marine Cultural Heritage, Historic Environment Scotland has confirmed
there are no marine or terrestrial heritage assets within their statutory remit within the
development site boundary or within its vicinity 
3.16. In addition to policy 28 of LDP2 this would also accord with LDP2 policies 15 and 19. 
This element of the proposal would also accord with NPF 4 policies 7 and 32. 
Designated sites, habitats and species for nature conservation (including Priority
Marine Features, wild migratory salmonids and European Protected Species). 
3.17. Policy 4 of NPF4 Natural Places seeks to ensure that Natural Places are protected and
restored.  This policy specifically refers to European sites.  LDP2 polices 73 and 74 are
relevant to this proposal. Policy 73 relates to development impact on habitats, species
and biodiversity while Policy 74 relates specifically to sites of international importance. 
Page 80

Page 81

LDP2 format template Nov 2023 
The aquaculture specific policies within NPF4 (policy 32) and LDP2 (Policy 28) also
require consideration of these issues. 
3.18. The proposal is not located within any nationally designated sites. However, reducing
the impact of sea lice on wild migratory salmonids is a key element of the current
Kilbrannan Sound Environment Management Plan (EMP) secured under the extant
consent (20/01345/MFF) and the submitted documentation sets out a number of
commitments by the applicant to manage sea lice impacts as follows: 
• Mowi is committed to compliance with the on-farm sea lice management threshold
levels and set out in the Industry Code of Good Practice. This is achieved by applying
strategic treatments / interventions, aimed at minimising the numbers of sea lice on
farmed fish, and prioritising control during the wild smolt migration period. Mowi’s sea
lice intervention strategy is based on the early (within 7 days) treatment of the very first
individual pens rather than the later treatment of whole farms. 
• Mowi will manage its farms in the EMP Management Area in accordance with the
Statement of Operational Practice as set in Annex B to minimise the impact of farming
activity on wild salmonids.
• Within EMP Management Area all three fish farms will be stocked synchronously with
Atlantic salmon smolts. 
3.19. Impacts on wild migratory salmonids are further managed through the provisions in the
current EMP which sets out a wild fish monitoring strategy for the wild salmonid
populations in Carradale Water and Endrick Water, under the direction of the Argyll
Fisheries Trust and the Argyll District Salmon Fisheries Board. This strategy aims to
produce data on the health of wild salmonid populations, within a zone of thirty kilometres
from the fish farms located in the EMP Management Area and assess the available
nursery habitat utilisation and levels of recruitment of juvenile salmonid fish in the middle
and upper reaches of the Endrick Water (from Craigbell weir to Loup of Fintry). 
3.20. As part of the wild fish monitoring programme for Carradale Water, Argyll Fisheries
Trust undertook fish population surveys at seven sites in Autumn 2023 to assess the
status of juvenile salmon and trout populations. These surveys update a time-series of
data collected in 2005 and 2009, with proposed annual monitoring to develop a longer-
term data set on the health of juvenile salmonid populations in the waterbody. The EMP
monitoring has continued in 2025 at the locations shown below, and is completed
annually, under the agreed monitoring plan with findings to be shared with the Council in
line with the EMP once available: 
• Carradale Water Estuary - Sea Lice Monitoring 
• Fish Population Survey - Carradale, Glen Lussa, Machrie Water 
• Endrick-Blane Water - Electrofishing 
• Clyde Estuary - sea lice monitoring in the Clyde Estuary at Dumbarton 
3.21. Mowi has also developed a sea lice connectivity model for the EMP Management Area
and wider waters to simulate the distribution of farm derived sea lice to inform farm to
farm infection risk and adaptive implementation of sea lice interventions. This modelling
will help to gain a better understanding of the areas where wild salmonids may be
vulnerable to infection pressure and inform monitoring locations. Mowi will also support
appropriately designed acoustic tracking studies with the aim of addressing information
gaps associated with the migration of salmon smolts. 
3.22. These programmes are likely to be continued through any National Sea Lice
Monitoring Framework to be implemented by SEPA. 
Page 81

Page 82

LDP2 format template Nov 2023 
3.23. In accordance with the Predator Control Plan, observations of wildlife and interactions
with the fish farm, including entanglement events, will be recorded and reported to Council
and NatureScot every 6 months. Acoustic Deterrent Devices (ADDs) have the potential
to disturb cetaceans, however, the applicant has committed to not using ADDs and this
application has been assessed on this basis.  A condition is proposed preventing the use
of ADDs. 
3.24. The proposal would accord with LDP2 Policy 73 – Development impact on Habitats,
Species and Biodiversity and LDP2 Policy 4 – Sustainable Development due to the
proposed mitigation for sea lice and the commitment to undertake wild fish monitoring and
adaptive management if required. 
Biodiversity enhancement 
3.25. NPF 4, Policy 3 – Biodiversity requires developments to contribute positively to
biodiversity enhancement. Given the nature and land ownership constraints of marine fish
farming operations, it is not always feasible to provide direct on-site benefits. However, in
this instance, the applicant is considering additional biodiversity enhancement which may
implemented as part of the Carradale Shorebase landscape and biodiversity
enhancement strategy. The applicant is also collating a portfolio of biodiversity
enhancement projects across Scotland (including native tree plantation on Skye and
projects to improve smolt survival in the River Awe catchment). 
3.26. A condition is proposed requiring an update to be submitted on these projects, to the
satisfaction of the planning authority. Taking account of the above, it is considered that
the proposal would also accord with NPF4 Policy 3 relating to biodiversity enhancement.  
Ecological status of coastal and transitional water bodies and biological carrying
capacity (water quality & seabed impacts). 
3.27. The site is operating with a CAR license (SEPA reference: CAR/L/1131788) and SEPA
has confirmed no objection to the proposed changes to the operation of this site. Following
the submission of further information, SGMD have advised that they have no objection to
the proposals and there is no requirement for any further assessment regarding impacts
to the water column regarding water column impact. 
3.28. Subject to compliance with SEPA’s requirements it is considered that the proposal
would comply with Policy 59 – Water Quality and the Environment. 
Commercial and recreational activity (including other coastal/marine users (MOD)),
and navigational interests (including anchorages). 
3.29. With regards to anchorages, The Royal Yacht Association (YHA) advised they have
no objections to the proposal. As such it is concluded that there would be minimal impacts
on recreational marine vessels within the local area. The proposal will not present adverse
navigational safety issues, subject to navigational marking to satisfy Northern Lighthouse
Board requirements and an informative has been attached to secure this. 
3.30. With regards to the impact on commercial fisheries, there have been 11 objections
submitted by local fishermen and a sustained objection by The Clyde Fishermen’s’
Page 82

Page 83

LDP2 format template Nov 2023 
Association which is the membership body for 40 commercial fishing vessels within the
Clyde. This sustained objection is despite ongoing dialogue between the applicant and
the CFA (please see all representations provided in full in the Report of Handling Section
C), the submission of a Moorings Technical Analysis Report, subsequent changes to
reduce the proposed mooring area and the submission of a commercial fisheries impact
report. 
3.31. In terms of the impact of local fishing boats to access local fishing grounds, further
moorings design modelling was undertaken by the applicant which subsequently
confirmed the ability to reduce the indicative moorings boundary by 250m on the deep
water, eastwards side. In addition, the moorings boundary to the west of Carradale south
was adjusted eastwards by 56m, to facilitate improved access for creel fishermen (in
response to concerns raised by the CFA) on the inshore side of the fish farm. The total
development area (including moorings) for the original proposals subject to screening,
was 0.826km2 for Carradale North, and 0.818km2 for Carradale South. Following
consultation and the above revised technical moorings analysis, revised plans have been
submitted which reduce the extend of the mooring areas to 0.471km2 for Carradale North,
and 0.471km2 for Carradale South. A reduction of 13% compared to moorings area
presented in the originally submitted planning applications and approximately 95% of the
supplied AIS (fishing vessel) tracks are now out with the proposed mooring development
areas. The applicant notes that any potential displacement effect would be minor
compared to the present baseline position, with two operational fish farms in place. 
3.32. In addition to developing embedded site design mitigation to allow continued access
to fishing grounds and avoid (or reduce) displacement effects to commercial fishing the
applicant has committed to a number of operational mitigation measures to prevent
conflict with commercial fishing and to promote and facilitate fishing with and in close
proximity to the site: 
• Following site installation, the installed mooring anchor coordinates will be
shared with local fishing vessels/CFA and the relevant fisheries representative
bodies to allow bottom trawling to be undertaken as close to the mooring
infrastructure as safely possible. 
• If appropriate and subject to other navigational considerations and approvals
Mowi is content to provide for enhanced navigational markers for the anchor
locations to the east of the fish farms to develop a safe transit-trawling corridor
past the sites. 
• Following installation, the majority of the area taken up by the mooring lines for
each development proposal will still be accessible for static gear fishing with full
exclusion only required during maintenance of mooring lines or boat operations.
Mowi would be willing to work with potting (creeling) vessels to allow and mark
safe access and deployment of creels within the mooring’s footprint of the
development sites. 
• Mowi would be willing to work with the CFA to improve communications and
liaison with local commercial fishing vessels on farming operations and activities
(such as equipment installation) and to provide a mechanism whereby areas of
conflict could be discussed and resolved. 
3.33. To inform future discussions, the applicant has commissioned a Commercial fisheries
impact assessment from a revised pen layout at the Carradale fish farm Phase 1 Report
– Desktop Evaluation (October 2025). This Phase 1 report uses published information
and AIS records to characterise commercial fisheries in the project area in order to identify
and scope potential interactions with the farm infrastructure and operations. The report
finds that the proposed farm location is located just north of Carradale on the western side
of the Kilbrannan Sound within ICES rectangle 40E414. It is fished by vessels from two
Page 83

Page 84

LDP2 format template Nov 2023 
Scottish fisheries districts of Ayr and Campbeltown, landing mainly into Tarbert,
Carradale, West Loch Tarbert and Troon & Saltcoats. The site bathymetry varies from 66
m to 96 m (Carradale North) and 28 m to 51 m (Carradale South), with the deepest parts
of the site to the east. The main farm area appears to lie on an area of gravelly sand.
Outside the site, the substrate turns muddier in the deeper water to the east. Around
10,600 t of mainly shellfish are landed from the ICES rectangle 40E4, worth some £25.6
million per annum. This is characterised as follows: 
• Demersal trawls (691 t): Nephrops dominates (>99%) the catch. These trawl
caught Nephrops are mostly landed into Tarbet (255 t), Campbeltown (157 t) and
Troon and Saltcoats (139 t); this catch is worth around £4 million. There is a very
small catch of the bottom trawled finfish into Tarbert only.
• Dredges (178 t): The dredge fishery caught 178 t of scallops in 2023. This is mainly
landed in the West Loch Tarbert (96 t), Tarbet (35 t), Campbeltown (25 t) and
Carradale (22 t). There are also 46 t of scallops landed into Tarbert from passive
gears (apart from creels).
• Pots and traps (e.g. creels) (191 t): Nephrops are the major creel-caught species,
representing 71% of the catch of this passive gear type. Other target species of
creels are brown crab (C. pagarus; 9% of the creel catch), velvet crabs (7%) and
lobsters (also 6%). Creel-caught Nephrops are mainly landed into Tarbert (90 t),
with 18 t each being landed into Carradale and Campbeltown. 
3.34. It should be noted that these figures cover the c. 2,500 km2 of statistical rectangle
40E4 which is bisected by the Kintyre Peninsula, with the eastern side including
Kilbrannan Sound to the south and Loch Fyne to the north and that the proposed site’s
combined mooring area is just 0.82 km2. In terms of timing, the Nephrops caught by
trawl peaks over the summer but the creel fisheries are more evenly spread through the
year. The crab and lobster creel fishers tend to land during the second half of the year.
Scallops are landed mainly in late summer. 
3.35. A vessel activity analysis using mainly AIS data indicates that the proposed site
extension is right on the western edge of the mainly north / south (and vice versa) tows
of the bottom trawl fishery that extends eastwards across the Kilbrannan Sound. Based
on AIS data records over a five year period (2019 – 2024) only nine (1.4%) were within
the new proposed planning boundary and four (0.3%) were within the proposed mooring
boundary. This suggests that the planning boundary is the effective westward limit of
bottom trawling this side of the Kilbrannan Sound. This is around 300 m away from the
outermost pens under the current configuration and 225 m from the outermost pens under
the proposed configuration. 
3.36. The report concludes that the proposed move to the east will not have any significant
impact on bottom trawling activities, although there will be very little margin for error in
navigation. Although not confirmed, this is also likely to be the case for the smaller scallop
dredging fishing in the same area. As most creel boats do not have historical AIS track
records but keep private plotter records, crab and lobster creeling is likely to be located
in the rocky, shallower water of the western inshore part of the site. Nephrops creeling
could take place in the deeper, muddier sediments to the north and south of the pens. It
is possible that some creeling takes place within the extended proposed planning area
but given that it is sandwiched between the farm moorings to the west and the mobile
gear fishing zone to the east this is unlikely. 
3.37. The report identifies that further work would need to be conducted to verify these
results and where necessary establish the extent of the use of mobile gear to the east of
the site (esp. smaller vessels that might not use AIS) and creeling activity in and around
the proposed project site. Potential stakeholder groups are identified as the CFA, the
Page 84

Page 85

LDP2 format template Nov 2023 
Scottish Creel Fishermen’s Federation (SCFF) and possibly the West Coast Inshore
Fisheries Group. 
3.38. The CFA have responded to the commercial fisheries report. They note that with
regards to the reduced mooring area achieved through revisions, the relative productivity
of even a small area of fishing ground is the most important factor. They also note that
the report does not adequately consider the wider economic impacts of the creeling
industry to the UK economy. The CFA reiterate their frustration at ‘always being the losing
side’ when it comes to sharing marine spaces with other parts of the aquaculture industry.
However, it is noted in this occasion that the applicant has engaged comprehensively with
the CFA, conducted extensive additional analysis with the intention of minimising this
conflict as far as possible by avoiding or minimising potential for conflicts through revised
mooring extents and have proposed further operational mitigation measures and ongoing
engagement. 
3.39. To this end, it is considered that a reasonable compromise on the reduced physical
extent of the moorings - grounded in the analysis of the technical moorings report and the
commercial fisheries study analysis has been reached and despite the ongoing objection,
this is acceptable in terms of maintaining co-existence with an already consented marine
fish farm. Planning conditions have been agreed with the CFA and the applicant to secure
the operational mitigation and support the establishment of local engagement forums with
commercial fishing interests in Kilbrannan Sound to support the principle of co-existence
with the local commercial fishing activity. 
3.40. Taking account of the above, it is considered that proposal would accord with NPF4
policy 32 and LDP2 Policy 28 where they refer to impacts on other marine users. 
Amenity, arising from operational effects (waste, noise, light and odour). 
3.41. Impacts from marine aquaculture developments can include nuisance and disturbance
for local residents, recreational and marine users from lighting, noise and odour
associated with the installation and operation of fish farms. The applicant has provided
details of proposed mitigation measures (submitted statement: ‘Mitigation of amenity
impacts arising from operational effects’ September 2025) that will avoid or reduce
potential noise, lighting and odour impacts. These measures are part of the project design
(embedded mitigation) and good practice operational measures that would form part of
standard planning conditions for any fish farm development. 
Managing noise impacts 
3.42. With regard to noise, the development is located along a section of coastline which is
sparsely populated, apart from the village of Carradale which is located 1.8km to the
south.  It is noted that the operational activity at Carradale Harbour is an existing
contributor to background noise levels for residential receptors. 
3.43. Implementation of best operational practice measures will eliminate, reduce, or
manage any potential noise impacts from operational activities to levels within the limits
of background noise, and ensure that they are minimised to ensure there are no likely
significant effects from noise disturbance. Embedded project design and best practice
management measures include the use of noise insulation on equipment, particularly on
the feed barge, and restriction of operational activity to normal operational hours, as far
as practicable. 
3.44. A number of vessels will continue to support day-to-day operations at the farm
throughout various stages of the production cycle. The vessels will undertake routine
Page 85

Page 86

LDP2 format template Nov 2023 
husbandry and maintenance activities, including grading, administering treatments, and
harvesting. The reduction in pen units from 20 to 12 that will arise (across the combined
fish farm) from the planned developments will result in operational efficiencies. Fewer pen
units will require much less overall maintenance, such as net cleaning activity and fewer
pen units will also allow the whole farm to be treated in quicker timelines. Overall it is
anticipated that there will be a reduction in vessel traffic around the sites and associated
activities such as net cleaning which have a noise profile. 
3.45. It should be noted that although standard working hours are from 07:00 to 20:00 over
7 days, some operations may be required outside this period for reasons of fish health
and welfare. Operations may also need to be undertaken outside of standard working
hours due to tidal conditions at the site or as a result of delays caused by poor weather
(due to the limited windows in which smolts require to be transported and transferred). 
Also, during certain periods of the year equipment integral to the production cycle will be
required to run overnight (e.g. underwater lighting and aeriation systems). Planning
conditions are attached to mitigate the effects of all out of hours operations and ‘Well
Boat’ activity and further detail is set out below. 
Minimising light pollution 
3.46. The three main operational light sources are (1) underwater anti-maturation lights
placed into pens, (2) night-time operations, particularly involving ‘Well Boats’, and (3)
measures set out by NLB to ensure the proposed development is appropriately marked,
including navigational lighting. 
3.47. At certain times of the fish growth cycle underwater lighting in pens is required for the
purposes of preventing salmon maturation. Their window of use is from October to the
end of the following March. As they are placed at depth surface glare is limited. Embedded
design mitigation includes the use of low intensity lights, their correct downward
orientation and shielding to reduce upward surface glare. 
3.48. The applicant notes that to manage responsibilities for fish health and welfare it is
sometimes necessary to employ ‘Well Boats’ in a 24/7 operation at the site. However,
every effort is made during treatment planning and scheduling to minimise treatment
times and avoid evening working periods especially in locations with neighbouring
sensitivities. Where multiple pens require treatment, ‘Well Boat’ duration at a site can
increase. As a result, in winter, with reduced daylight hours it is not always possible to
avoid working during the hours of darkness and the use of lighting on these vessels. The
applicant recognises this can introduce potential conflict with light sensitive properties
nearby and has worked with ‘Well Boat’ operators to apply the following mitigation
strategies to avoid the potential for light nuisance from essential night time operations (As
per ‘Further supporting information’ Mitigation of amenity impacts arising from operational
effects submitted 12.9.2025): 
• Design and scheduling (where possible) of ‘Well Boat’ based treatments with the aim of
avoiding or reducing the frequency and duration of vessel treatment activity on site
extending beyond 8pm. 
• Positioning of ‘Well Boats’ on site, to avoid the pen working area between the vessel
and the shore (where practicable). 
• Reduction in intensity of lighting to minimum specifications required. 
• Application of shielding/covers to lights to avoid directional glare away from the working
area. 
• Switching off lights when not required, for instance for the duration of treatments once
fish have been loaded on the vessel.
Page 86

Page 87

LDP2 format template Nov 2023 
• Education, working with operators to understand light sensitive areas and the need for
operational efficiencies in use of lights and positioning of the vessel. 
• Review and identification of options for temporary, less sensitive, positioning locations
for ‘Well Boats’ away from farms once fish have been loaded for treatment. 
3.49. Navigational Lights and Marks are prescribed by the International Association of
Lighthouse Authorities, who class the navigational light (Special Mark) currently on site
as ‘minor lights’ with a nominal range of 2 nautical miles. The Northern Lighthouse Board
have advised they would require an additional Special Mark for the proposed
development, so that the outer corner of the pen moorings grid is indicated. These lights
flash yellow once every 5 seconds (off more than on). The feed barge displays an all-
round white light (this is the same light that a vessel at anchor must display). While
navigation lights are essential for safe navigation mitigations strategies to avoid potential
nuisances, include proper placement, maintenance, shielding and education on their
requirement with marine and local stakeholders. 
Odour & waste management 
3.50. With regard to waste, a Fish Waste Management Plan (July 2024) is currently in place
for the Carradale site and will remain in place.  This contains provisions to ensure the
development will be kept tidy and any rubbish found on the adjacent shoreline is collected
on a regular basis to minimise the impacts of marine litter.   
3.51. Odours from fish farms are generally associated with fish feed and storage of
mortalities. Feed will be stored within sealed silos inside the proposed feed barge
negating the risk of fugitive emissions associated with feed storage. Fish mortalities will
be collected in a cone located at the bottom of each pen and retrieved using an integrated
lift-up system. Site staff will aim to remove mortalities from the base of the pen on a daily
basis and three  times a week as a minimum. Stock mortalities removed from the pens
will be stored in sealed containers for disposal at a licensed facility. There will be no net
increase in overall biomass as part of the proposed developments arising and no increase
in volume of waste produced is anticipated. There will be no material change to existing
processes dealing with mortality disposal in the farm management area. This is consistent
with NPF4 Policy 12 and LDP2 Policy 63. 
3.52. In relation to well boat operations, the applicant has agreed to provide proactive
notification of fish movements (i.e. delivery and collection of smolts) to the Council a year
in advance to facilitate monitoring of any amenity impacts. This will be secured by
planning condition. It is acknowledged that the tidal nature of this site is a limiting factor
and may along with instances or poor weather, occasionally result in well boat use out of
normal operating hours. However, it is best operational practice to ensure fish loading and
harvesting happens during daylight hours to minimise amenity impacts as far as
practicable. 
3.53. It is considered that the impacts on amenity would be acceptable and would not conflict
with LDP2 Policy 14 – Bad Neighbour Development, NPF 4 Policy 32 or LDP2 Policy 28.
LPD2 Policy 29 – Existing Fish Farm Consolidation and Rationalisation requires that
redundant equipment be removed from sites to manage waste impacts.  A condition is
therefore proposed to this effect. 
Net economic impact, including local community socio-economic benefits such as
employment, associated business and supply chain opportunities. 
3.54. NPF4 identifies the significant contribution aquaculture makes to the Scottish
economy, particularly for coastal and island communities. It also recognises that changes
Page 87

Page 88

LDP2 format template Nov 2023 
in economic activity have potentially greater impacts on communities in rural Scotland
than more populated areas. The applicant has submitted further information which details
how Mowi Scotland activity supports Scotland’s rural employment levels which allows
traditional settlement patterns and land use activities to be maintained and helps to
sustain local rural services. 
3.55. It is further noted by the applicant that Fish farming is uniquely placed to deliver actions
that will contribute to Argyll and Bute Council’s Economic Strategy and the focus areas of
People, Place, Planet and Prosperity with the company’s Argyll based operations
contributing to social and economic objectives. Examples showing how we are
contributing to social and economic benefits to the Kintyre peninsula are provided
throughout this response, including the following: 
• An existing community fund is in place for the operation of the Carradale Fish Farms
with Mowi contributing on an annual basis.
• Mowi, in partnership with Salmon Scotland and other farming companies, are working
with UHI Argyll to develop and deliver an Aquaculture SCQF4 academic qualification
with the practical classroom base elements to be delivered in Campbeltown,
Lochgilphead and Oban High Schools. Afterwards the students will then be placed on
work experience with a producer company.
• Mowi, has entered into a 3 year arrangement with the Campbeltown Picture House to
support the community operations and services provided 
Employment 
3.56. In terms of employment, the Carradale fish farms and the nearby Mowi North
Kilbrannan fish farm, consented in 2024, and also serviced from Carradale harbour
provide 16 direct jobs. The total number of direct jobs provided by Mowi across Argyll and
Bute is 75. The average basic salary of those employed by Mowi in the area is £35,059.
The Carradale fish farms have been established since 2009. In that time, they have been
successful operations from an economic, environmental, and social viewpoint. No new
jobs will be provided by the development proposals however the investment in this new
larger pen and net technology will future proof operations and employment levels ensuring
that the fish farms continue to be successful as fish farming in Scotland evolves. The
sector directly supports 540 jobs in Argyll and Bute, with local fish farms forming an
important part of the economies of rural communities. 
Annual Operational Expenditure 
3.57. Annual Operational Expenditure The cumulative operational annual expenditure for
the Carradale fish Farms in 2024 was £15M Within this figure, key local expenditures
include labour (£739k), repair and maintenance (£131k), other direct costs (£523k) and
indirect costs (£235k); a total of £1.63 million in 2024. Expenditure including feed, health
and insurance are not sourced locally, although may contribute to the wider national
economy. In 2024 Mowi, across all operations, spent over £14.5million directly with local
suppliers and service providers based in the Argyll and Bute council area. 
Proposed Capital Expenditure Arising from the Development Proposals 
3.58. The total capital expenditure for the development proposals for the Carradale North
and South fish farms, incorporating the new equipment, comprising 12 x 160m pens, 12
x fish nets and 2 x moorings grids and associated components is approximately £3.35
million. 
Page 88

Page 89

LDP2 format template Nov 2023 
Carradale Harbour Development Projects 
3.59. Following the recent commencement of fish farming operations at North Kilbrannan
and recognising the additional investment proposed for the Carradale fish farms, Mowi is
Mowi Scotland Limited, Farms Office, Glen Nevis Business Park, Fort William PH33 6RX
Registered in Scotland No. 138843 progressing a number of infrastructure improvement
projects in Carradale harbour, due to enhanced business needs. These will be delivered
in parallel with community benefit elements developed in consultation with the local
community with the shared aspiration to re-energise and improve the harbour environs.
The developments proposed include the following elements: 
• A pontoon for Mowi small personnel craft and defined local community boat
owners is proposed and has secured planning consent.
• A new shorebase for Mowi’s shoreside services and staff facilities is being
developed in the former (now remediated) scrap yard with a planning permission
recently granted.
• A renovation plan is being developed for the locally important and former (fire
damaged) Pier House and gardens, to bring the property back into residential use.
• A new community harbour building-facility will be provided by Mowi. The type of
building, use and location are being informed by a community consultation
exercise with the preferred option to be identified in partnership with the
community. 
Economic Value of Aquaculture to Argyll and Bute 
3.60. Aquaculture is an important part of the Scottish Marine economy. In 2022, aquaculture
generated £337 million aGVA, 0.20% of the Scottish economy and 7% of the marine
economy aGVA. Aquaculture employed 2,200 people, 0.08% of Scottish employment and
3% of marine economy employment. Of this, Atlantic (Scottish) salmon production
accounted for 96 per cent of all aquaculture value to the economy.1 Scottish salmon is
the UK's top food export, with sales worth £844 million in 2024. Exports of Scottish salmon
from the Argyll and Clyde regions rose to £125 million last year as demand for Scottish
salmon continues to grow. 
3.61. Given the above information it has been demonstrated that the proposed development
would have a positive economic impact in accordance with NPF4 Policy 25 – Community
wealth Building and NPF4 Policy 29 – Rural development which are supportive of rural
economic activity.  The proposal would also accord with LDP2 Policy 28, the aquaculture
specific policy which requires the economic contribution of aquaculture proposals to be
assessed. 
Potential benefits of sustainable site management proposals, which seek to mitigate
or reduce environmental risk from fish farming operations, including escapes,
disease and sea lice management and manage risk from fish farming operations,
including escapes, disease and sea lice management or manage risk through
adaptive management in response to environmental monitoring. 
3.62. The applicant notes the proposal to use fewer, larger pens than currently utilised at
Carradale is intended to benefit containment, sea lice management and fish health by
lowering the stocking density, improving water flow, and aiding the response, speed and
efficacy of management intervention. A number of documents have been submitted to
support the application and detail operational approaches to adaptive management of
environmental risks:
• Annex 3 Equipment Attestation 
Page 89

Page 90

LDP2 format template Nov 2023 
• Annex 4 Containment and Escapes Contingency Plan and Moorings Technical
Report 
• Annex 5 Sea Lice Management, Efficacy and Attestation 
• Annex 6 Waste Management Plans 
• Annex 7 Predator Mitigation Plan 
• Annex 9 Seascape, Landscape and Visual Assessment (Munro Landscape
(02.11.2023).  
• Kilbrannan Sound Environmental Management Plan (February 2024) 
3.63. In terms of sea lice management and the control of risk, the applicant notes that
effective sea lice management is a critical requirement to protect the health and welfare
of farmed fish and to minimise the risk of potential adverse impacts on wild salmonids.
The submitted material notes that poor management of sea lice not only generates
environmental impacts, but also a significant cost, primarily through compromised fish
health and performance. The applicant’s submitted supporting information entitled ‘Annex
5: Sea Lice Management, Efficacy and Attestation’ sets out its policies and aims for sea
lice management, before detailing the operational approach and resources that have
been implemented and applied at Carradale North and Carradale South marine fish farms
during previous cycles. It is noted that an integrated approach is used to meet regulatory
and industry guideline treatment thresholds for sea lice as well as the stricter operational
intervention thresholds that Mowi aspires to meet. The document also provides an
overview of other relevant fish health management procedures. 
3.64. In addition, an Environmental Management Plan (EMP) is in place for Kilbrannan
Sound. This commits to monitoring and reporting of lice burdens on farmed and wild fish,
a framework for cooperation and transparency and a framework for adaptive management
with feedback management measures to be taken in response to evidence of negative
impacts on wild salmonids.  As of 1 November 2025, SEPA has taken regulatory control
of sea lice interactions, with the proposed introduction of a national monitoring framework.
A planning condition has been attached to require an update of the EMP should the
monitoring framework mechanisms be revised. 
3.65. SEPA and SGMD have no objections to the proposals and a CAR permit is in place as
part of SEPA’s regulatory framework to manage environmental controls for marine fish
farms (SEPA reference: CAR/L/1131788). 
3.66. It is considered that the proposal would comply with this element of LDP2 Policy 28
and NPF Policy 32. The applicant has submitted supporting documents detail how the
development will be operated to minimise environmental risks and use mitigation and
monitoring where appropriate. 
Proposed operational measures which can mitigate or minimise the level of risk of
potential impacts (including on other aquatic or coastal interests). 
3.67.  NPF4 Policy 1 aims to encourage, promote and facilitate development that addresses
the global climate and nature crises while NPF 4 Policy 2 is supportive of developments
which have been sited and designed to adapt to current and future risks from climate
change. It is noted that marine aquaculture is seen as possible solution to global food
shortages that are predicted to increase as a result of climate change.  Wild Atlantic
salmon is not a sustainable food source. 
3.68. However, the industry has also been vulnerable to the effects of temperature rises
caused by climate change as evidenced by increased levels of mortalities.  Marine fish
farms in off-shore locations are also more vulnerable to the effects of storm events which
Page 90

Page 91

LDP2 format template Nov 2023 
are increasing as a result of climate change.  However, the Scottish Government Marine
Directorate are satisfied with the details of the equipment provided by the applicant. 
Equipment attestations and specifications have also been provided by the manufacturer
which state that the equipment has been designed in accordance with the Norwegian
standard to withstand the environmental conditions at the development location. 
3.69. A number of documents have been submitted by the applicant in relation to the
operation of the site (see above).  These include: Escapes Contingency Plan, Farm
Management Statement, Predator Mitigation Plan; and Farm Waste Management Plan.
The applicant has also provided a self-attestation to confirm that the proposed equipment
to be used is suitable for this site and an amended Moorings Technical Analysis Report
which details the inputs and results from a full technical dynamic analysis for the revised
pen and mooring system design, confirming compliance with applicable equipment design
requirements. Adherence to these matters will be secured through the use of planning
conditions. 
3.70. Subject to these conditions being complied with the proposal will accord with NPF 4
Policy 32 – Aquaculture and LDP2 Policy 28 – Supporting Sustainable Aquatic and
Coastal Development.  
Page 91

Page 92

LDP2 format template Nov 2023 
APPENDIX B – LIST OF CONTRIBUTORS 
OBJECTIONS 
1. James Anderson, Office, 110 Sound Of Kintyre, Campbeltown, PA28 6GA 
A further 11 proforma objection letters have been submitted by the following signatories: 
2. James Anderson, No address provided
3. Vytoldas Medeikis, No address provided 
4. John C Galbraith, No address provided
5. David Anderson, No address provided
6. James Coats, No address provided
7. L Ferguson, No address provided
8. Alasdair MacLean, No address provided
9. S Prentice, No address provided
10. Paul McAllister, No address provided
11. A Hamilton, No address provided
12. John Brown, No address provided 
Page 92

Page 93

© Crown Copyright and database right 2025
All rights reserved. OS license (customer) account number AC0000849384
Location Plan relative to; 24/01381/MFF
O
0 240 480120 Meters
Application Site
Page 93

Page 94

This page is intentionally left blank

Page 95

LDP2 format template Nov 2023 
Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle 
Reference No: 24/01382/MFF
Planning Hierarchy: Local Application
Applicant: Mowi Scotland
Proposal: Replace existing 10 x 120m circumference pens with 6 x 160m
circumference pens (with a parallel minor relocation into deeper
water moving the Carradale North site centre 79m east) and siting
of existing feed barge in a different location
Site Address:  Carradale North Fish Farm, Kilbrannan Sound, Argyll and Bute    
DECISION ROUTE 
☐Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
☒Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission
• Modification of existing pens 10 x 120m circumference to 6 pens 8 x
160m circumference pens in a 120 m x 120 m mooring grid matrix, held
in two linear rows of 4 pens;
• Installation of pole mounted top nets;
• Minor relocation of the existing and installed 600 tonne feed barge 
(ii) Other specified operations
• Navigational lighting in accordance with the requirements of the NLB.
• Biomass of 2,500 tonnes 
(B) RECOMMENDATION: 
It is recommended that: 
Planning permission be approved subject to the conditions and reasons appended to the
report. 
(C) CONSULTATIONS:   
Marine Directorate of the Scottish Government (dated 7.11.24): The two pen groups at
Carradale North and South are registered as one site with Scottish Ministers in the
applicant’s aquaculture production business authorisation. Therefore, the Fish Health
Page 95 Agenda Item 6

Page 96

LDP2 format template Nov 2023 
Inspectorate (FHI) have considered these concurrent applications together and provide
combined comments for these applications (ref: 24/01381/MFF and 24/01382/MFF). 
Summary of information required
• Confirmation of net depth
• Details of the practical time taken to perform physical treatments on the modified
site
• Details of the permitted quantities of chemotherapeutants on the South pen group
and the practical time taken to conduct these treatments 
Marine Directorate of the Scottish Government (dated 11.12.24): Having reviewed
the further information submitted by the applicant on 03/12/2024 the following comments
are made: 
Confirmation of net depth
Depth of net sidewalls is confirmed as 12m for inside pens and 15m for outside row of
pens. This is satisfactory for an acceptable stocking density level of below 22kg/m3.
Details of the practical time taken to perform physical treatments on the modified site -
The FLS system can treat 3x 160m pens per day, so could complete treatment of each
pen group in 2 days and the whole site in 4 days. 
Details of the permitted quantities of chemotherapeutants on the South pen group and
the practical time taken to conduct these treatments 
The revision to the permitted quantities of bath chemotherapeutants in the new CAR
licence application would allow bath treatments of azamethiphos to be undertaken on
the North or South pen group at a rate of 1 pen/day equating to 6 days for each full pen
group. It is noted that the pen groups may not discharge azamethiphos at the same
time, therefore should treatment of both pen groups be required for the whole site this
would take 12 days. Consented levels for the in-feed treatment emamectin benzoate
allows one use per cycle on each of the North and South pen groups at maximum
biomass or more frequent uses earlier in cycle when biomass is lower, as it has been
utilised in this manner in recent production cycles. 
Sea lice efficacy  
The CAR licences for both sites permit sufficient quantities of Azamethiphos and
Deltamethrin to allow the treatment of each site within 6 days and 3 days respectively
with tarpaulin treatments. The applicant has indicated that the Modelled Maximum
Quantity of the in-feed treatment Emamectin benzoate (SLICE) is sufficient for a single
treatment at maximum biomass (at each site). 
Given the exposed location of the site, there are concerns over the welfare of young fish
being stocked on site and their ability to withstand the currents and environmental
conditions experienced on site. It is noted the applicant state that larger smolts will be
stocked onto the site; the production plan details that the average size of smolts being
stocked will be 164g, with a production cycle of up to 18 months. Details of the
considerations made on the suitability of the site for fish of this size whilst ensuring any
impacts to welfare are mitigated against should be provided. This information may be
included in the Veterinary Health and Welfare Plan which is referenced but not provided. 
No further information required. 
Scottish Environmental Protection Agency (dated 29.10.24): We have no objection
to the proposed development from a planning perspective. We can confirm that we have
already authorised the change under CAR.
Page 96

Page 97

LDP2 format template Nov 2023 
Argyll and District Salmon Fishery Board (dated 24.10.24):   Our consultation
response to the application is made in respect to the importance of populations of Atlantic
salmon present in the rivers of Kintyre and Isle of Arran, and several smaller coastal
rivers that also support populations of sea trout which support active recreational
fisheries, local employment, and economy. 
Our primary interest remains the reduction of pressure on wild salmonids from sea lice
and escaped farm fish, and we broadly support innovation in the aquaculture sector to
develop production methodologies which can mitigate for impacts on wild fish. In
principle, Argyll DSFB have no objection to the change in fish pen sizes. However, on
the premise that the potential failure in containment in one of the six larger cages
proposed may pose some increased risk of interactions with wild fish populations given
that a higher number of post-smolt salmon will be held in fewer, but larger pens. We also
note and appreciate the measures described in the escapes contingency plan provided
with the application which detail measures to reduce the potential for escapes of farm
stock to occur. We are, however, mindful that escapes of farm fish remain a possibility
as there has been a significant escape of farm fish from this site in recent years. We
appreciate the most recent equipment designs may improve containment measures but
the risk to wild salmon populations remains. We are, however, mindful that escapes of
farm fish remain a possibility and that we need to be assured that the containment
measures put in place are sufficient to protect local wild salmon populations over time.
To this end we ask that a regular programme of genetic surveillance of local wild salmon
populations is undertaken over the lifetime of the farm. This programme of genetic
monitoring should be capable of identifying any introgression of escapee farm salmon
with wild salmon populations in the area. Argyll DSFB, expect such a programme of
surveillance to be embedded within an Environment Monitoring Plan (EMP). 
In summary, Argyll DSFB has no objection to the proposed change in fish pen size at the
Carradale farm site in the understanding that an EMP that monitor the genetic health of
wild salmon populations in the Awe Fisheries District is a condition of any change in the
planning permission. 
Argyll Fisheries Trust: No response. 
NatureScot (dated 15.10.2024): Confirmed no comments. 
Historic Environment Scotland (dated 30.10.24): Confirm that there are no marine or
terrestrial heritage assets within statutory remit within the development site boundary or
within its vicinity. No comments. 
West Highland Anchorages and Moorings Association (WHAM) (15.10.2024): no
comment. 
Northern Lighthouse Board (dated 18.10.24): Consultation response includes details
of lighting and marking requirements. 
Royal Yachting Association (dated 30.10.24): RYA Scotland has no objection to this
application. However, it is noted that the outer perimeter of the farm will extend 85 m
further east into the busy Kilbrannan Sound. It will be important to ensure that this
expansion is widely publicised including through an update to the Clyde volume of the
Clyde Cruising Club Sailing Directions and Anchorages book and that care is taken to
ensure that the lights are well maintained at all times as a failure could have unfortunate
consequences in conditions of poor visibility. 
Page 97

Page 98

LDP2 format template Nov 2023 
Marine and Coastal Development Policy Officer (dated 18.11.24): There is no
objection to the proposed changes at Carradale North fish farm. In terms of possible
containment failure, I do however agree with the Argyll District Salmon Fisheries Board
(ADSFB) in that it will be important for the Applicant to monitor the genetic health of local
wild salmon populations through a programme of genetic surveillance. This should be
stipulated within the Applicant’s Environmental Monitoring Plan (EMP). 
Planning conditions to be applied to the Carradale North Fish Farm
1. The Applicant is asked to submit their EMP.
2. The Applicant will not use Acoustic Deterrent Devices (ADDs). If ADDs are
proposed at the site at any time in the future, the Applicant must apply for a
European Protected Species Licence from the Scottish Government Marine
Directorate - Licensing Operations Team (MD-LOT); including immediate
notification and an ADD usage report with daily logs to be communicated with
NatureScot and the Planning Authority on request.
3. Daily recording of wildlife interactions (entrapment/entanglement) with the site and
the reporting of data at six-monthly intervals. The six-monthly reports are to be
communicated with NatureScot and the Planning Authority.
4. Immediate notification to NatureScot and the Planning Authority of wildlife
entrapment/entanglement, as stipulated by NatureScot.
5. To implement a monitoring programme, as stipulated by NatureScot.
6. To implement adaptive management approaches based on monitoring findings (as
agreed with NatureScot in consultation with the Planning Authority). 
Update: Having reviewed the additional supporting documentation submission from Mowi
for both planning applications: 24/01381/MFF - Carradale South Fish Farm and
24/01382/MFF - Carradale North Fish Farm, there are no further comments to add. 
Clyde Fishermen’s Association (dated 1.11.2024 & 5.11.24): On this occasion efforts
were made to inform the CFA of the plan for the extension.  MOWI also listened to
concerns and comments presented by the fishermen who attended a meeting in February
2024.  MOWI also advised of their intention to submit plans and slight alterations they
would make.  So in respect to communication in this particular project it was improved in
that dialogue did occur and we appreciated the mutual effort fishermen and MOWI made.   
However, unfortunately as an association our member feedback has been that they
would have to object to the planning applications above in the strongest possible terms. 
They feel the current arrangement is already an existing example of sharing space and
compromise which works to an extent for both parties, and this proposal would
detrimentally harm fishing unnecessarily when both sectors can continue to exist under
the current arrangements.   
The fishermen from our membership were clear at the online meeting in February 2024
that a move of the current site closer to the East and further into the deep water would
cut into the main tows of the indigenous fishing fleet who rely on this area for their
livelihoods.   This area is vital to the socio-economics of local fishing communities.  The
feedback from local fishermen is that this area is essential to fishing and could not be
lost without risking the viability of local productive fishing boats and the loss of jobs.  It is
prime fishing ground for catching fresh wild seafood. 
Whilst we appreciate MOWI have now presented a model which is reduced on their
initially proposed Eastward move, in reality even the reduced Eastward expansion in into
the deep fishing water is significantly detrimental to local fishermen, just as the original
proposal also was.  Neither new options work for local fishermen.  Local fishermen are
not simply being difficult as they currently work with a situation of compromise right now
Page 98

Page 99

LDP2 format template Nov 2023 
which is more palatable to most fishermen.  The current MOWI site initially meant a loss
of ground to local fishermen so many already feel a compromise and balance has already
been reached.   
It should be noted that many fishermen do have environmental concerns regarding
aquaculture, so a current working situation should not be underestimated in terms of its
value for local stability of relations and food production.       
Local fishermen feel the fairest compromise has already been reached previously, and
this would be that the site remains at its current location and does not extend onto another
deeper footprint in direct conflict with fishing patterns.  A continuation of the current
situation would allow both aquaculture and local fishing to continue to co-exist in the area
and work alongside in the same vicinity.   
The extension of the aquaculture site Eastward would be the expansion of one sector at
the cost of another local sector.  The CFA feel this proposal doesn’t make sense when
the current activity sites of aquaculture and wild fishing in the area currently works to
some degree for both sectors.   
We hope Argyll and Bute Council should want to maintain both of the sectors in the area
with a degree of harmony or at least good relations, not sacrifice one for the expansion
of the other if both can co-exist.  We appreciate MOWI may be disappointed if they are
not able to expand/move the site, but we must reiterate we feel a compromise has
already been reached on balancing wild fishing with aquaculture in this location which
saw local fishing curtailed a number of years ago. 
Concerns raised on the impact on local fishing tows at the proposed site as well as wider
impacts on the fishing community at Carradale Harbour and the fishing which takes place
here is an important employer of local fishermen, exporters and processors and retailers
in both Carradale, Campbeltown and well beyond.         
Applicant response to CFA (22.5.2025): We understand the concerns expressed on
spatial conflict by commercial fishing stakeholders. We also acknowledge the need to
interact with other marine users who may be impacted by fish farming, including
fishermen with a view to establishing mitigation that allows the shared use of the marine
space, avoiding and minimising potential displacement effects. We have focussed on
establishing design mitigation to ensure that the proposed mooring areas have the
minimum spatial footprint whilst maintaining structural integrity to ensure containment at
the farms. Through the design of the development proposals, we have worked to reduce
the overall extent of the mooring areas, whilst ensuring that the mooring systems meet
all required technical design standards and is capable of withstanding the physical
characteristics of the development locations. There is no recognised single data source
for establishing a locational baseline of commercial fishing activity, and there remains
data uncertainty on frequency and intensity of fishing activity, however the information
provided by the CFA on local fishing activity allowed for further modelling analysis and
reduction of the moorings systems for each of the development locations. 
A reduction in the fish farm moorings area, from that presented in the respective planning
applications is now proposed for both developments. A more detailed breakdown of the
iterative changes in the extent of the respective moorings areas through the process for
planning approval is presented below. 
Moorings Design Mitigation 
An initial, indicative moorings boundary for the Carradale fish farms was presented in the
applications for screening submitted to Argyll and Bute Council, which were subject to
Page 99

Page 100

LDP2 format template Nov 2023 
consultation. Following screening and in response to comments received from the CFA,
a consultation meeting was held with the CFA (and local members) on 2 February 2024
to discuss and understand fishing grounds and activity to the east of the fish farms. From
the information presented on fishing grounds and use there was a commitment from
Mowi to re-examine the extent of the mooring’s areas for each development with the aim
to reduce their extent. Further moorings design modelling was undertaken which
subsequently confirmed the ability to reduce the indicative moorings boundary by 250m
on the deep water, eastwards side. In addition, the moorings boundary to the west of
Carradale south was adjusted eastwards by 56m, to facilitate improved access for creel
fishermen (as informed by CFA meeting, pers. comms.) on the inshore side of the fish
farm. 
The amended moorings layout-boundaries for both Carradale North and Carradale South
fish farms were then presented with the respective planning applications. The total
development area (including moorings) for the original proposals subject to screening,
was 0.826km2 for Carradale North, and 0.818km2 for Carradale South. Following
consultation and the above revised technical moorings analysis, and as submitted for
planning approval, the extent of the mooring’s areas were reduced to 0.471km2 for
Carradale North, and 0.471km2 for Carradale South. 
Post planning applications submission and following further consultation advice from the
CFA and provision of new data on fishing use of the area to the east of the fish farms,
including fishing vessel AIS tracks, further moorings modelling was undertaken. The new
fisheries data ensured that the modelling design analysis considered the additional
fishing information (AIS tracks). The analysis focussed on the east side of the
development locations and further moorings design mitigation that would avoid or reduce
potential displacement effects from the respective developments. 
The new analysis confirmed that with a further 50m reduction to the proposed moorings
boundary to the east of both fish farms could be safely accommodated. It was also
determined that it was possible to remove the NE corner of the Carradale North moorings
boundary, and the SE corner of the Carradale South moorings boundary as further
mitigation aimed at maintaining as much access as possible to the fish grounds to the
east of the fish farms. Following the refined technical moorings analysis, the extent of the
respective moorings’ areas for both development proposals have been further reduced
to 0.410 km2, a reduction of 13% compared to moorings area presented in the planning
applications. A comparison of the mooring areas for the current operational fish farms vs
proposed development is presented below: 
Moorings area – current 120m
pens
Moorings area – proposed
160m pens
Carradale North 0.330 km2  0.410 km2
Carradale South 0.405 km2  0.410 km2 
We would estimate approximately 95% of the supplied AIS (fishing vessel) tracks are
now out with the proposed mooring development areas and any potential displacement
effect would be minor compared to the present baseline position, with two operational
fish farms in place. A site plan showing the revised moorings areas for both development
proposal with geo referenced AIS fishing vessel tracks is annexed to this response
(Annex 1). This document should be treated as Confidential and be detached from this
response as it contains commercially sensitive information on fishing grounds. An
amended Moorings Technical Analysis Report is annexed as a separate document to
this response (Annex 2). The report details the inputs and results from a full technical
dynamic analysis for the revised pen and mooring system design, confirming compliance
with applicable equipment design requirements. 
Page 100

Page 101

LDP2 format template Nov 2023 
Operational Mitigation 
In addition to embedded design mitigation to prevent conflict with commercial fishing
Mowi can also commit to a series of operational mitigation measures. 
1. Following site installation, the installed mooring anchor coordinates will be shared with
local fishing vessels/CFA and the relevant fisheries representative bodies to allow bottom
trawling to be undertaken as close to the mooring infrastructure as safely possible. 
2. If appropriate and subject to other navigational considerations and approvals Mowi is
content to provide for enhanced navigational markers for the anchor locations to the east
of the fish farms to develop a safe transit-trawling corridor past the sites. 
3. Following installation, the majority of the area taken up by the mooring lines for each
development proposal will still be accessible for static gear fishing with full exclusion only
required during maintenance of mooring lines or boat operations. Mowi would be willing
to work with potting (creeling) vessels to allow and mark safe access and deployment of
creels within the mooring’s footprint of the development sites. 
4. Mowi would be willing to work with the CFA to improve communications and liaison
with local commercial fishing vessels on farming operations and activities (such as
equipment installation) and to provide a mechanism whereby areas of conflict could be
discussed and resolved. If deemed appropriate we would be willing to work with the
planning authority to find suitable wording to capture this as a condition on any planning
decisions. 
Conclusion 
Through a detailed and exhaustive design process for the mooring systems for each
development, it has been possible to reduce the length of individual mooring lines to
ensure the mooring areas have the minimum footprint. 
• The extent of the mooring’s areas presented in the planning applications were
0.471km2 for Carradale North, and similarly 0.471km2 for Carradale South. 
• Following the revised technical moorings analysis, the extent of the respective
moorings’ areas have been reduced (from planning application details) to 0.410
km2 (13% reduction) for both proposed development sites (Carradale North and
Carradale South fish farms). 
• While the focus of our attention has been developing embedded site design
mitigation to allow continued access to fishing grounds and avoid (or reduce)
displacement effects to commercial fishing there are also a number of
operational mitigations measures we can implement to promote and facilitate
fishing with and in close proximity to the site. In particular we would seek to
build on the effective working relationship established through this process with
the CFA and extend this to the establishment of better local engagement forums
with commercial fishing interests in Kilbranann Sound. 
We understand the frustration and concerns of commercial fishermen on spatial squeeze
of accessible fishing grounds. Aquaculture has shared concerns on the threats of
cumulating pressures on use of shared marine spaces, and we have tried to limit our use
of the marine environment at Carradale to ensure we avoid (or minimise) the potential
for displacement effects, supporting the principle of mutual co-existence with commercial
fishermen. 
Next Steps 
It is intention to proceed with a formal amendment to the planning applications on to
revise the mooring areas in accordance with the above. The requisite amended
application forms and associated updated supporting information, including revised plans
will be submitted in due course. Data limitations and uncertainties exist with regards to
the available evidence on the frequency and scale of fishing activity adjacent to and
Page 101

Page 102

LDP2 format template Nov 2023 
within the development areas and the extent of any potential displacement effects.
Accordingly, we are additionally considering the commission an independent desktop
review to better characterise commercial fisheries within the proposed development site.
The intention is to identify the key fisheries interests for a finer scale analysis and scope
potential interactions with the proposed development infrastructure. 
Officer comment: revised plans have been submitted following the discussions with CFA
and the results of the Technical Moorings Report. 
Update: The applicant has commissioned and submitted a further Commercial
Fisheries Impact Assessment by Poseidon (October 2025) to assess the nature and
level of fishing activity in the Kilbrannan Sound areas of the western arm of the lower
Firth of Clyde; to examine the likely spatial and temporal impacts of the farms’
redevelopment on identified fishing activities; and to provide an independent impact
assessment and suggest possible mitigation options. 
This report has concluded that the proposed site is located within the ICES rectangle
40E4 and around 10,600 t of mainly shellfish are landed from this area, worth some £25.6
million per annum over the c. 2,500 km2 of statistical rectangle 40E4. The proposed site’s
combined mooring area is just 0.82 km2 and from analysis undertaken Based on AIS
data records over a five year period (2019 – 2024) only nine (1.4%) were within the new
proposed planning boundary and four (0.3%) were within the proposed mooring
boundary. This suggests that the planning boundary is the effective westward limit of
bottom trawling this side of the Kilbrannan Sound. This is around 300 m away from the
outermost pens under the current configuration and 225 m from the outermost pens
under the proposed configuration. Based on this evidence, the proposed move to the
east will not have any significant impact on bottom trawling activities, although there will
be very little margin for error in navigation. Although not confirmed, this is also likely to
be the case for the smaller scallop dredging fishing in the same area. 
Although not verified by the AIS data (most creel boats do not have historical AIS track
records but keep private plotter records and are now having to adopt i-VMS), crab and
lobster creeling is likely to be located in the rocky, shallower water of the western inshore
part of the site. Nephrops creeling could take place in the deeper, muddier sediments to
the north and south of the pens. It is possible that some creeling takes place within the
extended proposed planning area but given that it is sandwiched between the farm
moorings to the west and the mobile gear fishing zone to the east (see the two sections
above), this is unlikely. 
Clyde Fishermen’s Association Response to Posiedon Report (14.11.2025): CFA
reiterate that as the local fishing association with over 40 fishing boats in our
membership, we represent the majority position of those vessels and their crew. We are
extremely concerned the local and national socio-economic value of coastal fisheries and
their onward benefits and place in the link of local economies is not well understood or
downplayed.  Most local fishermen in Argyll and Bute will emphasis a lot of safe and
productive ground has been lost to aquaculture in recent years, and often they feel their
businesses and perspectives are not being successfully fully heard.   
We note in the Poseidon report that a small percentage of local fishing area is to be
impacted, however in a large marine area it is often the case that an area which is under
5% of the total area could be the most productive and safest, therefore using a mitigation
metric in terms of percentage of total area lost really doesn’t make sense.  It’s the
productivity of that area and its safety which should be considered.     
Page 102

Page 103

LDP2 format template Nov 2023 
Local fishermen met with MOWI some time ago and provided fishing tracks of their
activity, some of which will be recorded on AIS and some which would not have been. 
The fishermen explained how important this area is to them in person, and the provided
tracks clearly showing creep into important fishing grounds via the proposal.  The local
fishermen feel the current aquaculture site co-existing with local fishing in the area is
already a compromise, but this change would be a step too far for loses for local fishing
boats.   
We note that the Poseidon report acknowledges their report doesn’t capture vessels not
using AIS, and this will represent a good number of local boats.  The Scottish
Government are currently looking at improved ways to monitor vessels to make sure all
activity is captured and the monitoring systems we have are more effective.  It is without
dispute that those local vessels not using AIS won’t have been factored into this
assessment at all, and so the assessment will be missing out vital detail for fishing.  Had
we a similar opportunity and resource to commission a similar style report for wild fishing
we are sure it would show a very different picture in socio-economic terms.   
We also note that the time period landings and activity the Poseidon report covers the
period of both Brexit redtape impacting catching and exporting of seafood and the covid
period.  During both of these events many fishing boats were forced to tie up or operate
in a much reduced capacity due to domestic and international market shut
down/reduction.  Indeed for periods during this timescale fishermen needed government
support via grants to survive as did many businesses.  Whilst fishing was returning to
some normality nearer the end of this period, it wouldn’t be fair to assess the socio-
economics of this period on a typical metric for the fishing sector.       
The Poseidon doesn’t touch on the value of the landings into Northern Irish ports (around
£45m total landings, some of which will be caught in the Clyde Marine Area).     
Cumulative issues are not considered in this report either.  In the Marine Area of the
Clyde we have 5 Marine Protected Areas, a weekend ban on mobile fishing, a seasonal
closed cod box, Royal Navy closed areas, numerous aquaculture sites, No Take Zones
and a number of energy cables particularly around Carradale, with more planned in the
near future.  In addition we are going to consultation shortly for Priority Marine Feature
Closures and more Marine Projected Areas and rewilding projects.   
If we want to have a vibrant sustainable fishing fleet, the boats need space to fish, and
locally this would unfortunately be another restriction they can ill afford.  Death by a
thousand small cuts for fishing shouldn’t be an option we choose if resilience and
development is an option.  We have good stock advice for the area and latent capacity
in fishing which is also a socio-economic opportunity and potential for the area which
shouldn’t be discounted.  This year ICES advised a 54% increase in nephrops alone for
the West Coast (21,654 tonnes), there is scope to develop fisheries not just in nephrops
but beyond the currently fished stocks.  Local Fishermen have set out a vision for
development for fisheries in the area which can be found on the link below in short and
long version: 
Science & Policy - Clyde Fishermen’s Trust 
We have also invested heavily in training courses and a training centre to service the
whole Clyde area for fishing, and we are doing our best to boost the socio-economics of
our local fishing sector by innovation and development, but we can only successfully
achieve this well if fishing is resilient and reflexive, we cannot always be the losing party
in respect to marine access, it will defeat the work fishermen from the Argyll and Bute
region and the Clyde region beyond are investing into a better future.   
Page 103

Page 104

LDP2 format template Nov 2023 
We also note the Poseidon report does not capture the onward value of fishing beyond. 
Fishing supports the crew on the boats and their families, but it also supports haulage,
retail and hospitality domestically and internationally, processing and exporting,
boatyards and engineers, fuel merchants, policy work, supermarkets and accreditation
companies   
Officer comment: please see assessment of commercial fisheries impacts in Section 3
of the attached Appendix A - Committee Report. 
Argyll and Bute Biodiversity Officer (dated 08.11.24):  No comments to make. 
Argyll and Bute Environmental Health (dated 4.9.24):  No comments but notes that
construction work can be very noisy and there may be a need to protect the amenity for
nearby sensitive receptors in the locality of the development. 
Officer comment: The applicant has committed to mitigation measures to protect
neighbouring amenity from operational noise and light and adherence to this will be
secured by planning condition. 
(D) HISTORY:   
09/00905/MFF Formation of new 14 cage fish farm including foodstore/service pontoon.
(Approved 11.11.2009) 
14/01047/MFF Alterations to existing marine fish farm by enlargement of mooring grid to
increase cage spacing, without extension of mooring area or changes in number or size of
cages (Approved 18.7.2014) 
15/00127/MFF Formation of fish farm (Atlantic Salmon) comprising the siting of fourteen
100 metre circumference cages served by feed barge associated with adjacent site.
(Approved 4.11.2015) 
15/01939/MFF Re-equipment of marine fish farm from 14 no. 100 metre circumference
cages to 10 no. 120 metre circumference cages and retention of feed barge (Approved
14.9.2015) 
15/03017/MFF Formation of fish farm (Atlantic Salmon) comprising the siting of ten 120
metre circumference cages served by feed barge associated with adjacent site. (Approved
23.12.2015) 
18/01172/SCRSCO Screening and scoping request for alterations to and extension of
existing fin fish farm and increase in biomass from 2500 tonnes to 3750 tonnes (Opinion
Issued 19.7.2018) 
19/00107/PNMFF (north) Installation of replacement pens and net (PA Not Required
26.7.2019) 
23/00142/SCREEN Screening Opinion for reconfiguration of infrastructure from 10 x 120m
circumference cages to 6 x 160m circumference cages with a parallel minor relocation into
deeper water (Negative Screening Opinion issued 6.4.2024) 
(E) PUBLICITY:  
Page 104

Page 105

LDP2 format template Nov 2023 
ADVERT TYPE:
Regulation 20 Advert Local Application
EXPIRY DATE: 15.11.2024 
(F) REPRESENTATIONS:   
(i) Representations received from: 
James Anderson, Office, 110 Sound Of Kintyre, Campbeltown, PA28 6GA 
A further 11 proforma objection letters have been submitted (please see Appendix B for a
list of the contributors). 
Representations are published in full on the planning application file and are available
to view via the Public Access section of the Council’s website. 
(ii) Summary of issues raised: 
• Impact on local fishermen and families
• Better areas available for expansion
• Concern about ability to influence planning decisions 
Officer response: the impact on commercial fisheries is considered in detail in Section 3 of
the attached Committee Report – Appendix A. In summary, officers consider that the
applicant has engaged proactively with the Clyde Fishermen’s Association from the
inception of the proposed project and in response to concerns raised has commissioned
detailed technical analysis to reduce the extent of the moorings area by 14%, with the
intention of minimising the impact on the local fishing industry. The applicant has also
proposed further operational mitigation measures and ongoing engagement in response to
the CFA’s sustained objection. A planning condition has been applied to support the
establishment of a local engagement/liaison forum and agree mechanisms for operational
mitigation to support the principle of co-existence with the local commercial fishing activity
in the Kilbrannan Sound.   
It is further noted that Argyll District Salmon Farming Board support the proposed change
in fish cage size and configuration on the basis that the changes will include the use of the
most robust modern cage technology and fish farm handling procedures. 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report: ☐Yes ☒No 
(ii) An Appropriate Assessment under the
Conservation (Natural Habitats) Regulations
1994:   
☐Yes ☒No 
(iii) A Design or Design/Access statement:    ☐Yes ☒No 
(iv) A Sustainability Checklist  ☐Yes ☒No 
Page 105

Page 106

LDP2 format template Nov 2023 
(with reference to the requirements of LDP2
Policy 04) 
(v) A report on the impact of the proposed
development eg. Retail impact, transport
impact, noise impact, flood risk, drainage
impact etc:   
☒Yes ☐No 
Planning Application: 
Overview (Supporting Document) including:
Annex 1 Site Plans and Charts 
Annex 2 Equipment Plans and Elevations 
Annex 3 Equipment Attestation 
Annex 4 Containment and Escapes Contingency Plan and
Moorings Technical Report 
Annex 5 Sea Lice Management, Efficacy and Attestation 
Annex 6 Waste Management Plans 
Annex 7 Predator Mitigation Plan 
Annex 8 Screening Opinion – EIA Not Required 
Annex 9 Seascape, Landscape and Visual Assessment (Munro
Landscape (02.11.2023).  
Kilbrannan Sound Environmental Management Plan (February
2024) 
Post submission:
Mowi Statement of Mitigation (12.9.2025)
Mowi Socio-economic Supporting Statement (12.9.2025)
Moorings Technical Analysis Report, Reference GFME-TR-
076, dated 18 February 2025
Commercial Fisheries impact assessment from a revised pen
layout at the Carradale fish farm – Phase 1 Report – Desktop
Evaluation (October 2025) 
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   ☐Yes ☒No 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  ☐Yes ☒No 
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy
Page 106

Page 107

LDP2 format template Nov 2023 
Sustainable Places
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 12 – Zero Waste 
Productive Places
NPF4 Policy 25 – Community Wealth Building
NPF4 Policy 29 – Rural Development
NPF4 Policy 32 – Aquaculture 
Argyll and Bute Local Development Plan 2 (Adopted February 2024) 
Spatial and Settlement Strategy
Policy 04 – Sustainable Development 
High Quality Places
Policy 08 – Sustainable Siting
Policy 14 – Bad Neighbour Development 
Diverse and Sustainable Economy
Policy 28 – Supporting Sustainable Aquatic and Coastal Development 
Sustainable Communities
Policy 59 – Water Quality and the Environment
Policy 63 – Waste Related Development and Waste Management 
High Quality Environment
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 74 – Development Impact of Sites International and National Importance 
(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. 
• Third Party Representations
• Consultation Reponses
• Planning History
• ABC Technical Note – Biodiversity (Feb 2017)
• ABC Landscape Studies
• Scotland’s National Marine Plan (2015) 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  ☒Yes ☐No 
The proposal is Schedule 2 development and a Negative Screening Opinion (ref:
23/00142/SCREEN) was issued by the Council on 3.3.2023.    
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  ☐Yes ☒No 
Page 107

Page 108

LDP2 format template Nov 2023 
(M) Does the Council have an interest in the site:  ☐Yes ☒No 
(N) Requirement for a pre-determination hearing: ☐Yes ☒No 
In deciding whether to exercise the Council’s discretion to allow respondents to appear at
a discretionary hearing, the following are of significance: 
• How up to date the Development Plan is, the relevance of the policies to the
proposed development and whether the representations are on development plan
policy grounds which have recently been considered through the development plan
process. 
• The degree of local interest and controversy on material considerations together
with the relative size of community affected set against the relative number of
representations, and their provenance. 
The current Local Development Plan was approved in 2024.  NPF4 which was approved in
2023 contains a similar criteria-based approach in relation to aquaculture applications.  It
is considered that the development plan is up to date. 
At the time of writing this application has attracted 11 objections from local fishing boat
operators relating to conflict over fishing grounds. No objections have been raised by
statutory consultees in relation to these matters. 
Furthermore, it is noted that the site is already in operation for marine fish farming and there
will be no overall increase in biomass as a result of the proposed changes to pen sizes.
Officers consider that the relocation of Carradale North and South represents a small
percentage of the available fishing grounds and it is noted that through further discussions,
revised moorings have further reduced the impact on local fishing activity. It is further noted
that the modernisation of marine fish farming activity at this site is welcomed by statutory
consultees for benefits to fish health and the applicant has committed to ongoing
communication with local fishing boats to maintain access to dishing grounds wherever
possible. 
It is not considered that there would be merit in holding a Pre-determination Hearing as all
planning matters raised as objections have been suitably addressed through the submitted
material and/or through the use of planning conditions. It is the view of officers that a pre-
determination meeting therefore would not add value to the decision-making process in this
instance.    
(O)(i) Key Constraints/Designations Affected by the Development: 
(ii) Soils - Not applicable as this is a marine development 
(iii) Woodland - Not applicable as this is a marine development  
(iv) Land Status / LDP Settlement Strategy - Not applicable as this is a marine
development 
Page 108

Page 109

LDP2 format template Nov 2023 
(P) Summary assessment and summary of determining issues and material
considerations 
This application is for a change of equipment and a minor relocation of an existing
marine fish farm in the Kilbrannan Sound approximately 400m off the eastern shore
of the Kintyre Penninsula.  The proposal would replace the existing 10no 120m
circumference pens with 6 x 160m pens in a formation of 3 x 2 along with the slight
change in the position of an existing 650 tonne feed barge which would be located
to the south of the group on the shore side.  The site would continue to be serviced
from the company’s existing shore base located at Carradale Harbour. 
The proposed development is located approximately 1.8 km north of Carradale
village on the western edge of Kilbrannan Sound and east of the Kintyre peninsula.
The smaller hamlet of Grogport lies approximately 2.6 km north west of the Site. 
There is to be no change to the consented biomass for the site. The proposal is part
of a wider 5 year project by the applicant to upgrade and modernise fish farming pens
to bring about a number of benefits:
• Improved health and safety conditions through the upgrading of equipment;
• Improved health and welfare of fish.  
• As the biomass is not increasing the density of the fish will be reduced and
fish can be treated more efficiently in fewer pens, reducing amenity impacts. 
This proposal is not EIA Development. The recommendation on this application has
been guided by the consultation responses from Scottish Government Marine
Directorate, NatureScot, SEPA, Argyll District Salmon Fishery Board, Historic
Environment Scotland, Northern Lighthouse Board, Royal Yachting Association,
Argyll and Bute Environmental Health, and the Argyll and Bute Marine and Coastal
Officer. 
Representations received have been addressed in Section F of this report (above)
and against the planning policies of the adopted Development Plan which comprises
NPF4 and LDP2 as well as other material considerations, including those relating to
marine planning (see Appendix A). 
The proposal would accord with Development Plan policy and accordingly, it is
recommended that planning permission be approved subject to conditions 
(Q) Is the proposal consistent with the Development Plan: ☒Yes ☐No 
(R) Reasons why Planning Permission or Planning Permission in Principle Should
be Granted: 
The proposal is considered to be consistent with the relevant provisions of the
Development Plan, and there are no other material considerations of sufficient
significance to indicate that it would be appropriate to withhold planning permission
having regard to s25 of the Act. 
(S) Reasoned justification for a departure to the provisions of the Development
Plan
Page 109

Page 110

LDP2 format template Nov 2023 
Not Applicable 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
☐Yes ☒No 
Author of Report: Shelley Gould Date: 4/12/25 
Reviewing Officer: Sandra Davies Date: 4/12/25 
Fergus Murray
Head of Development & Economic Growth 
Page 110

Page 111

LDP2 format template Nov 2023 
CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 24/01382/MFF 
Standard Time Limit Condition (as defined by Regulation) 
Additional Conditions 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 3.7.2024, supporting information and, the approved drawings
listed in the table below unless the prior written approval of the Planning Authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997.  
Plan Title.  Plan Ref. No.  Version  Date
Received 
General view and location of Carradale fish
farm site location
Annex 1: Figure
1
0001 16.9.2025 
Existing site location (installed) (1:8,000)
(dated 4.10.2024)
Annex 1  16.9.2025 
Existing (installed) & Proposed site (1:8,000)
(dated 24.3.2025)
Annex 1   16.9.2025 
Proposed site (1:8,000) (dated 24.3.2025) Annex 1   16.9.2025 
Admiralty Chart Proposed site
(1:25,000) (dated 24.3.2025)
Annex 1  16.9.2025 
Proposed equipment co-ordinates Annex 1   16.9.2025 
Existing equipment co-ordinates Annex 1  16.9.2025 
Existing elevations – configuration 120m pens
in 75m matrix grid (dated 11.7.2022)
Annex 2: 
Figure 1
0001 31.7.2024
Proposed elevations - configuration 160m
pens in 100m matrix grid (dated: 2.4.2020)
Annex 2: 
Figure 2 
10.10.2024
Manufacturers Diagram - Typical Moorings
Design (dated 2.4.2020)
Annex 2: 
Figure 5
0001 31.7.2024
Manufacturers Diagram – Net Design (dated
2.4.2020)
Annex 2: 
Figure 3
0001 31.7.2024
Manufacturers Diagram – Top Net Support
Structure (dated 7.5.2021)
Annex 2: 
Figure 4
0001 31.7.2024
Manufacturers Design Specification – 160m
pen (dated 17.6.2021)
Annex 11  14.10.2024
Existing feed barge photographs (dated
October 2024)
Annex 10  14.10.2024  
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. Acoustic Deterrent Devices 
No Acoustic Deterrent Devices (ADDs) shall be deployed at the site hereby approved. 
Page 111

Page 112

LDP2 format template Nov 2023 
Reason:  In the interests of nature conservation.  This planning application has been
assessed on the basis that ADDs will not be used. The use of ADDs would be regarded
as a material change to the proposal.  
3. Biomass and Stocking 
The development hereby approved shall not be operated other than with a biomass of
2500 tonnes or less and shall only stock one species of fin fish (other than cleaner fish). 
Reason:  The environmental effects of this proposal have been assessed against this
maximum biomass of one species. 
4. Fallow Period 
There shall be a minimum of 28 days in each calendar year when the site will be fallow
and this shall be applied synchronously with the other fish farms within the Kilbrannan
Sound FMA. 
Reason:  In the interests of nature conservation.  
5 Removal of Existing Equipment 
Prior to the development hereby approved being brought into use, the redundant
equipment relating to the previous layout shall be removed from the site. 
In the event that the development or any associated equipment approved by this
permission ceases to be in operational use for a period exceeding three years, the
equipment shall be wholly removed from the site thereafter, unless otherwise agreed in
writing by the Planning Authority. 
Reason: In the interest of visual amenity and to accord with LDP2 Policy 29. 
6. Redundant Equipment/Equipment Failure 
In the event of equipment falling into disrepair or becoming damaged, adrift, stranded,
abandoned or sunk in such a manner as to cause an obstruction or danger to navigation,
the developer shall carry out or make suitable arrangements for the carrying out of all
measures necessary for lighting, buoying, raising, repairing, moving or destroying, as
appropriate, the whole or any part of the equipment. 
Reason: In the interest of visual amenity and safe navigation. 
7. Finished Surfaces 
The finished surfaces of all equipment above the water surface, excluding the feed barge,
but inclusive of the surface floats and buoys associated with the development hereby
permitted (excluding those required to comply with navigational requirements) shall be
non-reflective and finished in a dark recessive colour unless otherwise agreed in
advance in writing by the planning authority.   
Reason: In the interest of visual amenity. 
8. Lighting 
Page 112

Page 113

LDP2 format template Nov 2023 
All lighting above the water surface and not required for safe navigation purposes should
be directed downwards by shielding and be extinguished when not required for the
purpose for which it is installed on the site. 
Reason: In the interest of visual amenity and navigational safety. 
9. Noise 
The Noise Rating Level attributable to the operational activities associated with the
approved fish farm shall not exceed background noise levels by more than 3dB(A) at any
noise sensitive property measured and assessed in accordance with BS4142:2014.   
Reason: In order to protect the amenities of the area from noise nuisance. 
10.  Proactive notification of fish movement operations 
The applicant shall provide the dates of any planned fish movements utilising large
vessels in a year in advance in writing to the Planning Authority. 
Reason: In the interests of improving monitoring and reducing impacts on amenity. 
11. Hours of operation 
Except where the planning authority has been notified under the provisions of condition
10 or in situations outwith the applicant’s control (e.g. tidal conditions, fish movements
delayed by bad weather or fish health interventions); no operations, other than water
pumping, feeding, servicing, environmental monitoring and maintenance testing of
plant/equipment shall take place on site outwith the following times: 07.00 hours to 20.00
hours over 7 days. 
Reason: In the interests of amenity. 
12. Mitigating impacts of operations (including out of hours and Well Boat operations) 
All site operations including: 
• the use of equipment integral to the production cycle (e.g. underwater lighting
and aeration systems or well boats) which is required to run overnight for fish
health reasons;
• operations notified under the provisions of condition 10; and 
• any fish health interventions or delayed operations out of hours,   
shall adhere to the best practice measures detailed in the ‘Further Supporting Information
- mitigation of amenity impacts arising from operational effects’ document (submitted by
MOWI on 12.9.2025). 
All delayed or out of hours operations required to be undertaken outwith the provisions
of condition 10 shall be recorded by the applicant. A record of these out of hours activities
shall then be made available to the Planning Authority on request. 
Reason: In the interests of improving monitoring and reducing impacts on amenity. 
13. Environmental Management Plan (EMP) 
Page 113

Page 114

LDP2 format template Nov 2023 
The development site shall be operated in accordance with the submitted Environmental
Management Plan (Kilbrannan Sound EMP (8.2.24). The EMP should be reviewed and updated
if required following the adoption by Scottish Government of any new policy framework relevant
to sea lice management and wild salmonid interactions. Any proposed amendments to the EMP
shall be submitted to and approved in writing by the planning authority prior to the changes
being implemented. 
Reason: In the interests of nature conservation and protecting the environment. 
14. Waste Management Plan 
The development shall be carried out in accordance with the Carradale Waste
Management Plan dated July 2024 or as updated and agreed in writing with the Planning
Authority. 
Reason:  To ensure that waste is dealt with in a sustainable manner in accordance with
Development Plan policy. 
15.  Containment and Contingency Escapes Plan 
The development shall be carried out in accordance with the Containment and
Contingency Escapes Plan dated April 2024 or as updated and agreed in writing with
the Planning Authority. 
Reason:  to maintain the integrity of the holding structures and the measures to be
taken in the event of a suspected escape. The plan is specific to the proposed
installation of 160 m circumference pens. 
16. Sea Lice Policy Strategy and Efficacy Statement 
The development shall be carried out in accordance with the ‘Carradale Sea Lice –
Policy, Strategy and Efficacy Statement’ dated October 2024 or as updated and
agreed in writing with the Planning Authority. 
Reason:  In the interests of nature conservation. 
17. Biodiversity Enhancement Proposals 
Within 3 months of the date on this planning permission, a Biodiversity enhancement
strategy shall be submitted for the approval of the planning authority.  Thereafter the
applicant shall implement the proposals in line with the approved strategy and provide
updates at the request of the planning authority. 
Reason: In order to protect biodiversity, reverse biodiversity loss, deliver positive
biodiversity effects and strengthen nature networks in accordance with the
requirements of NPF 4 Policy 3. 
18. Local Fisheries Liaison 
Within one month of the date of this decision the applicant shall establish a forum for
effective operational communication with the members of the Clyde Fisheries
Association. This forum shall be used to agree and implement proposed operational
mitigation mechanisms in relation to sharing of installed mooring anchor coordinates
and the provision of enhanced navigational markers for anchor markers where
possible.
Page 114

Page 115

LDP2 format template Nov 2023 
Reason: In order to support co-existence of local fisheries and salmon farming on this
site and ensure both navigational and fish pen containment safety while maintaining
as much access to fishing grounds for creeling vessels as is reasonably practicable. 
Page 115

Page 116

LDP2 format template Nov 2023 
ADDITIONAL NOTES TO APPLICANT 
• Please see the consultation response dated 18 October 2024 from the Northern
Lighthouse Board (NLB) for the lighting and marking requirements for this site. 
• The Aquatic Animal Health (Scotland) Regulations 2009 requires the authorisation of all
Aquaculture Production Businesses (APB's) in relation to animal health requirements
for aquaculture animals and products thereof, and on the prevention and control of
certain diseases in aquatic animals.  The authorisation procedure is undertaken on
behalf of the Scottish Ministers by the Fish Health Inspectorate (FHI) at the Marine
Directorate Marine Laboratory.  To apply for authorisation for an APB or to amend details
of an existing APB or any site that an APB is authorised to operate at, you are advised
to contact the FHI as follows:  Fish Health Inspectorate, Marine Directorate Marine
Laboratory, 375 Victoria Road, Aberdeen, AB11 9DB.  Tel: 0131 244
3498;  Email:  ms.fishhealth@gov.scot 
• All marine farms, whether finfish, shellfish or algal, are required to apply for a marine
licence under Part 4 of the Marine (Scotland) Act 2010. To apply for a marine licence,
or to amend details of an existing marine licence (formally Coast Protection Act 1949 –
Section 34 consent), please visit the Scottish Government’s website at
http://www.gov.scot/Topics/marine/Licensing/marine/Applications where application
forms and guidance can be found. Alternatively you can contact the Marine Directorate
Licensing Operations Team (MD-LOT) by emailing MD.MarineLicensing@gov.scot; or
calling 0300 244 5046. 
Page 116

Page 117

LDP2 format template Nov 2023 
COMMITTEE REPORT
APPENDIX A – RELATIVE TO APPLICATION NUMBER:  24/01382/MFF 
PLANNING LAND USE AND POLICY ASSESSMENT 
1. Introduction 
1.1. The Carradale South fish farm was originally consented in 2009 with Carradale North
being consented in 2015. This application is for a change of equipment for the existing
Carradale North marine fish farm, located in the Kilbrannan Sound approximately 400m
off the eastern shore of the Kintyre Penninsula.  The proposal would replace the existing
10no 120m circumference pens with 6 x 160m pens in a formation of 3 x 2 along with
the slight change in the position of an existing 650 tonne feed barge which would be
located to the south of the group on the shore side.  The site would continue to be
serviced from the company’s existing shore base located at Carradale Harbour. 
1.2. With innovation in pen design and with improving design and capacity of support
vessels, Mowi has been upgrading pen equipment across Scotland since 2022. There
are now 11 Mowi sites operating 160m pens in Scotland with the Carradale farms being
the latest sites we propose to transition. The driver for the developments are operational
efficiencies and establishing the conditions for improved health and welfare of farm
reared salmon. Fewer, larger pens will reduce stocking density (leading to fish health
and welfare benefits) in addition to increasing the efficacy of administering any
treatments and undertaking farm maintenance activities. No increase in fish production
levels is being sought. The applicant has submitted several applications to the Council
to upgrade operational fish farm facilities by replacing existing pens with few smaller
pens. This allows a lower stocking density without increasing biomass and has
associated benefits for health and safety and fish health. It is noted that there is no
proposed increase to the biomass for this site which is 2500 tonnes as consented
through the CARs license. A sister application has been submitted for the adjacent
Carradale South Marine Fish Farm (24/01381/MFF). The applicant has also recently
received planning permission to improve shore base facilities at Carradale Harbour
(25/00884/PP) as part of a wider generation proposal for the area. 
1.3. The proposed development is located approximately 1.8 km north of Carradale village
on the western edge of Kilbrannan Sound and east of the Kintyre peninsula. The smaller
hamlet of Grogport lies approximately 2.6 km north west of the Site. The site is not
located within any areas of local or national designation and is 2.5km from the east
Kintyre Local Landscape Area. 
2. Planning Policy 
2.1. The Development Plan for the determination of this planning application comprises
National Planning Framework 4 (NPF4), adopted February 2023, and the Argyll and
Bute Local Development Plan 2, adopted February 2024.  NPF 4 is based around six
overarching spatial principles which the proposed development should align with.  These
are:
• Just transition;
• Conserving and recycling assets; 
• Local living;
• Compact urban growth;
Page 117

Page 118

LDP2 format template Nov 2023 
• Rebalanced development;
• Rural revitalisation. 
2.2. Not all of these principles will be relevant to every development and in relation to the
current proposal it is considered that just transition, rural revitalisation, local living and
rebalanced development would apply.  In terms of rural revitalisation, NPF4 supports
development that helps retain and increase the population of rural areas in Scotland. 
2.3. The main policy which relates to aquaculture in NPF 4 is Policy 32, however, other
policies within this plan are also relevant and need to be considered in the determination
of this proposal. With regard to LDP2, Policy 28 is the main aquaculture policy, however,
there are also other relevant policies which are listed above against which the proposal
requires to be assessed. 
2.4. The proposal benefits from general support from the Scottish Government’s National
Marine Plan and from NPF4 which together recognise the contribution of the aquaculture
sector to the rural economy and which seek to support sustainable economic
development. The National Marine Plan and NPF4 both support marine fish farming
where it can take place in environmentally sustainable locations, where it does not
exceed the carrying capacity of the water body within which it is to be located, and where
it does not give rise to significant adverse effects upon nature conservation, wild fish,
historic environment or other commercial or recreational water users. 
2.5. Whilst not part of the Development Plan, the Council as a public body is required to take
authorisation decisions in accordance with the National Marine Plan (NMP) as the
proposal extends into the marine environment, unless relevant considerations indicate
otherwise.  The proposal should be consistent with general policies of the NMP
including: 
GEN 1 – General planning principle;
GEN2 – Economic benefit;
GEN 3 – Social benefit;
GEN 4 – Co-existence – requires consideration that may occur and the likely effect of
interaction between inshore commercial fisheries (loss of fishing ground) and marine
and coastal recreational activities.
GEN 5 Climate change;
GEN7 – Landscape/seascape;
GEN 9 – Natural Heritage
GEN 10 – Invasive non-native species;
GEN 11 – Marine Litter;
GEN 12 – Water Quality and Resource;
GEN 13 – Noise. 
2.6. NPF4 Policy 32 refers the National and Regional Marine Plan and notes that proposals
will be supported where they comply with the relevant plans.  The criteria noted within
the NMP policies above are also covered within the Development Plan policies. 
2.7. Beyond development plan considerations, in determining the application regard has to
be had to the Council’s’ Economic Development Action Plan which identifies aquaculture
as an important contributor to the local economy, and to national government economic
and sectoral policy, the stated intention of which is to seek to expand the finfish sector
substantially to meet internal and export demands and to help sustain direct and indirect
employment in rural areas.   
Page 118

Page 119

LDP2 format template Nov 2023 
2.8. In addition, one of the proposals contained within the Rural Growth Deal for Argyll and
Bute relates to a vision for Argyll and Bute to be the leading region for innovation in
marine aquaculture in Scotland, UK and globally, by underpinning sustainable, inclusive
business growth through investment in world class marine science and technology.  This
includes a commitment to a Marine Industry Needs Assessment. This study will provide
the evidence base for industry needs to inform future investment outcomes and the
potential options available to deliver these outcomes. This will assist in identifying the
key priorities for Rural Growth Deal investment and where this should be targeted to
support sustainable growth of this sector and set out in the business case for
consideration and approval by Scottish Government. 
3. Assessment Against Policy Criteria 
3.1. NPF Policy 32 relates specifically to aquaculture.  It aims to encourage, promote and
facilitate aquaculture development whilst minimising adverse effects on the
environment.  The policy outcomes sought from this policy are: 
• new aquaculture development is in locations that reflect industry needs and
considers environmental impacts;
• producers will contribute to communities and local economies;
• prosperous finfish, shellfish and seaweed sectors;
• migratory fish species are safeguarded. 
3.2. In terms of the spatial strategy Policy 32 does not support development in the north and
east coast of mainland Scotland.  This is in order to safeguard migratory fish species. 
3.3. Point (C) of Policy 32 requires consideration of the operational impacts of fish farms and
specifically cites a number of criteria which require to be considered.  These criteria are
also reflected in the Council’s LDP2 which was adopted in February 2024. 
3.4. The proposal requires to be assessed against all of the relevant policies contained within
the development plan and not just the aquaculture specific ones.  There are some
parallels between the requirements of the aquaculture policies and other policies within
the development plan and these will be highlighted in the assessment of this application. 
The application will be assessed against the criteria from LDP2 Policy 28 below with
other relevant policies from NPF4 and LDP2 referred to where they would apply. 
Landscape / coastal character, seascape or visual amenity (including Isolated Coast,
Wild Land and National Scenic Areas) 
3.5. The applicant has submitted a Landscape, Seascape, Visual Impact Assessment for the
Carradale Fish Farm Proposed Replacement Pens carried out by Munro Landscape
(02.11.2023).  The appraisal evaluates the landscape and visual effects the proposed
modifications to the Carradale North and Carradale South sites to replace the 20 existing
120m circumference fish pens with 12 160m circumference fish pens with a slight
relocation to the east towards deeper water which will see the Carradale North pen grid
move approximately 129m and Carradale South move 149m. The Proposed Development
would be located within Seascape Character Area 10 - Lower Firth of Clyde (west) and
adjacent to the Upland Forest Moor Mosaic Landscape Character Type.  The baseline
studies confirmed that the Proposed Development would not be located within a
designated landscape however the North Arran NSA is located 2.7 km to the east and the
East Kintyre APQ lies 2.0 km to the south of the proposed location. 
Page 119

Page 120

LDP2 format template Nov 2023 
3.6. The appraisal provides a comparative Zone of Theoretical Visibility (ZTV) illustrating the
‘change’ in visibility resulting from the change in the location of the pens. Within 5 km of
the Proposed Development the ZTVs indicates a very narrow band of visibility on Kintyre,
with views largely constrained to the eastern slopes and shoreline. Notable
locations/receptors with theoretical visibility include the village of Carradale, and the B842
between Cour and Grogport. Visibility is also predicted from short sections of the Kintyre
Way and from the summit of Cnoc nan Gabhar (Deer Hill). To the east, from landfall
locations on Arran, visibility is indicated as occurring from the coastline and western
slopes of the island, notably between Imachar and Whitefarland Point (including the C147
and Arran Coastal Way). Open views from offshore locations across the study area within
the Kilbrannan Sound are indicated as occurring. These views of the Proposed
Development are predicted to be very similar in extent to the existing Carradale North and
South Fish Farms and add only very small areas of new visibility of the fish pens. 
3.7. The submitted SLVIA concludes that resulting effects on landscape character associated
with the replacement, and minor relocation of the fish pens would result in, at most,
negligible effects on the character of the seascape and landscape. These effects are not
significant and ultimately reversible. There would also be no significant effects on
landscape designations within the study area to the Proposed Development, including the
North Arran NSA and the East Kintyre APQ. Effects on all designations within the study
area resulting from the Proposed Development would be at most negligible. These effects
are ultimately reversible. The SLVIA concludes: During the operational phase there would
be no direct effects on landscape features or elements which define landscape character
types or contribute to the special qualities of landscape designations. All effects on
landscape character types and designations would be indirect and non-significant in
nature only, the assessment determining that in comparison with the existing fish pens
the level of effect would be negligible. The level of effect on Lower Firth of Clyde (west)
SCA would also be negligible.” 
3.8. In terms of visual effects, 5 viewpoints were selected to aid the assessment of this issue. 
The viewpoints and the reason for their selection are noted in the table below: 
View
point
number
Viewpoint Name Reason for selection Distance to the
Proposed
Development
1 B842 north of
Grogport 
The viewpoint is representative of
the views available for road users
of the B842 road, and cyclists on
the NCR 78, north of Grogport, at
a promoted picnic are within the
Plateau Moor and Forest LCT 39,
and the Port Raoin Mhor to Sgeir
Bhuidhe Seascape Character
Area within the Lower Firth of
Clyde (West) Seascape
Character Area 10. 
3km
2 Cnoc nan Gabhar
(Deer Hill) 
The viewpoint is representative of
the views available for
recreational receptors at a hill top
location, within the Plateau Moor
and Forest LCT 39.
1.9km
3 Culcreuch Road,
Carradale 
The viewpoint is representative of
the views available for residential
2.2 km
Page 120

Page 121

LDP2 format template Nov 2023 
receptors, on Culcreuch Road,
Carradale within the Coastal
Glens LCT 36, and the Port na
Cuile to Port Raoin Mhor
Seascape Character Area within
the Lower Firth of Clyde (West)
Seascape Character Area 10.
The viewpoint is located within
the Area of Panoramic Quality
(LLA). 
4 Carradale Harbour  The viewpoint is representative of
the views available for
recreational receptors at Port
Crannaich, Carradale Pier, within
the Coastal Glens LCT 36, and
the Port na Cuile to Port Raoin
Mhor Seascape Character Area
within the Lower Firth of Clyde
(West) Seascape Character Area
10. The viewpoint is located
within the Area of Panoramic
Quality (LLA).
2.2km
5 Imachar Point, Arran The viewpoint is representative of
the views available for
recreational receptors on the
Arran Coastal Way, south of
Imachar, within the Raised Beach
Coast and Cliffs LCT 59, and the
Loch Ranza to South Machrie
Bay Seascape Character Area
within the Lower Firth of Clyde
(West) Seascape Character Area
10. The viewpoint is located
within the North Arran National
Scenic Area and Special
Landscape Area. 
4.7km 
3.9. In consideration of the degree of change to the existing view that the Proposed
Development would constitute the predicted magnitude of change arising from the
Proposed Development would be negligible. The visual effects on visual amenity
experienced by people in Carradale would be negligible, non-significant, long-term
(reversible) and adverse. 
3.10. Visual impacts on tourists, or those participating in recreation activities, may be brief
in nature by passing through the area on boat, ferry, horse, foot, bike or kayak, their
sensitivity to landscape and visual change is high because their purpose/activity is to
appreciate landscape and surroundings. The visual assessment has considered views
from recreational receptors within 10 km of the Development focusing on those within 5
km radius of the Proposed Development within the detailed study area. Nearby recreation
receptors within the detailed study area of the Development include the National Cycle
Route NCN 78 and the Kintyre Way long distance footpath on Kintyre. On Arran, the Arran
Coastal Way falls within the detailed study area where it passes close to Imachar. 
Page 121

Page 122

LDP2 format template Nov 2023 
3.11. The visual assessment has also considered the potential visual effects likely to be
experienced by people travelling through the landscape on the local road network. Views
will vary depending on proximity to the road, the mode of transport, the angle of view, and
intervening landscape features. Potential visual receptors falling within the detailed study
area included residents, including those in the village of Carradale and the hamlet of
Grogport, in addition to users of the B842 on Kintyre and C147 on the Isle of Arran.
Recreational routes falling within the study area include the Kintyre Way, the Arran
Coastal Way and National Cycle Route 78. A number of core paths were also identified,
these principally comprising a network of paths around Carradale but also forming
sections of the Kintyre Way or following the B842. There are also a number of Core Paths
within the Study Area, and the following have been identified as wholly or partially falling
within the detailed study area: 
• C094(b) – Tayinloan – Carradale East West Link; 
• C093(b) - Carradale Forest circular; 
• C403 - Port na Cuile - Seneval Wood, Carradale; 
• C097(b) - Carradale Bay circular; 
• C088(c) - Campbeltown to Cloanaig 
• AR81 – Coirein Lochan. 
3.12. For visual receptors, the Proposed Development, predominantly as a result of the very
minor relocation of the pens to the east but also as a result of changes to the size and
number of pens, would very slightly change the views people experience. In comparison
to the views of the existing pens, the Proposed Development would result in a negligible
effect in views from Carradale and no effect from Grogport. In views from transport and
recreational routes, both on Kintyre and the Isle of Arran, the Proposed Development
would similarly result in a negligible effect on visual amenity. In all cases these effects
would be non-significant and reversible. 
3.13. In conclusion, there would be no significant seascape, landscape effects and visual
effects arising as a result of the Proposed Development in comparison to the degree of
change associated with the replacement pens and the existing fish pens to Carradale
North and South. It is concluded that the Proposed Development would not result in
significant effects on landscape / seascape character and visual amenity. 
3.14. The proposal would therefore be in accordance with aquaculture policies 32 d (i)
(NPF4), Policy 28 – Supporting Sustainable Aquatic and Coastal Development, LDP2
Policy 4 – Sustainable Development and LDP2 Policy 8 – Sustainable Siting. 
The natural, built and / or historic or archaeological sites and their settings 
3.15. In terms of Marine Cultural Heritage, Historic Environment Scotland has confirmed
there are no marine or terrestrial heritage assets within their statutory remit within the
development site boundary or within its vicinity 
3.16. In addition to policy 28 of LDP2 this would also accord with LDP2 policies 15 and 19. 
This element of the proposal would also accord with NPF 4 policies 7 and 32. 
Designated sites, habitats and species for nature conservation (including Priority
Marine Features, wild migratory salmonids and European Protected Species). 
3.17. Policy 4 of NPF4 Natural Places seeks to ensure that Natural Places are protected and
restored.  This policy specifically refers to European sites.  LDP2 polices 73 and 74 are
relevant to this proposal. Policy 73 relates to development impact on habitats, species
and biodiversity while Policy 74 relates specifically to sites of international importance. 
Page 122

Page 123

LDP2 format template Nov 2023 
The aquaculture specific policies within NPF4 (policy 32) and LDP2 (Policy 28) also
require consideration of these issues. 
3.18. The proposal is not located within any nationally designated sites. However, reducing
the impact of sea lice on wild migratory salmonids is a key element of the current
Kilbrannan Sound Environment Management Plan (EMP) secured under the extant
consent (20/01345/MFF) and the submitted documentation sets out a number of
commitments by the applicant to manage sea lice impacts as follows: 
• Mowi is committed to compliance with the on-farm sea lice management threshold
levels and set out in the Industry Code of Good Practice. This is achieved by applying
strategic treatments / interventions, aimed at minimising the numbers of sea lice on
farmed fish, and prioritising control during the wild smolt migration period. Mowi’s sea
lice intervention strategy is based on the early (within 7 days) treatment of the very first
individual pens rather than the later treatment of whole farms. 
• Mowi will manage its farms in the EMP Management Area in accordance with the
Statement of Operational Practice as set in Annex B to minimise the impact of farming
activity on wild salmonids.
• Within EMP Management Area all three fish farms will be stocked synchronously with
Atlantic salmon smolts. 
3.19. Impacts on wild migratory salmonids are further managed through the provisions in the
current EMP which sets out a wild fish monitoring strategy for the wild salmonid
populations in Carradale Water and Endrick Water, under the direction of the Argyll
Fisheries Trust and the Argyll District Salmon Fisheries Board. This strategy aims to
produce data on the health of wild salmonid populations, within a zone of thirty kilometres
from the fish farms located in the EMP Management Area and assess the available
nursery habitat utilisation and levels of recruitment of juvenile salmonid fish in the middle
and upper reaches of the Endrick Water (from Craigbell weir to Loup of Fintry). 
3.20. As part of the wild fish monitoring programme for Carradale Water, Argyll Fisheries
Trust undertook fish population surveys at seven sites in Autumn 2023 to assess the
status of juvenile salmon and trout populations. These surveys update a time-series of
data collected in 2005 and 2009, with proposed annual monitoring to develop a longer-
term data set on the health of juvenile salmonid populations in the waterbody. The EMP
monitoring has continued in 2025 at the locations shown below, and is completed
annually, under the agreed monitoring plan with findings to be shared with the Council in
line with the EMP once available: 
• Carradale Water Estuary - Sea Lice Monitoring 
• Fish Population Survey - Carradale, Glen Lussa, Machrie Water 
• Endrick-Blane Water - Electrofishing 
• Clyde Estuary - sea lice monitoring in the Clyde Estuary at Dumbarton 
3.21. Mowi has also developed a sea lice connectivity model for the EMP Management Area
and wider waters to simulate the distribution of farm derived sea lice to inform farm to
farm infection risk and adaptive implementation of sea lice interventions. This modelling
will help to gain a better understanding of the areas where wild salmonids may be
vulnerable to infection pressure and inform monitoring locations. Mowi will also support
appropriately designed acoustic tracking studies with the aim of addressing information
gaps associated with the migration of salmon smolts. 
3.22. These programmes are likely to be continued through any National Sea Lice
Monitoring Framework to be implemented by SEPA. 
Page 123

Page 124

LDP2 format template Nov 2023 
3.23. In accordance with the Predator Control Plan, observations of wildlife and interactions
with the fish farm, including entanglement events, will be recorded and reported to Council
and NatureScot every 6 months. Acoustic Deterrent Devices (ADDs) have the potential
to disturb cetaceans, however, the applicant has committed to not using ADDs and this
application has been assessed on this basis.  A condition is proposed preventing the use
of ADDs. 
3.24. The proposal would accord with LDP2 Policy 73 – Development impact on Habitats,
Species and Biodiversity and LDP2 Policy 4 – Sustainable Development due to the
proposed mitigation for sea lice and the commitment to undertake wild fish monitoring and
adaptive management if required. 
Biodiversity enhancement 
3.25. NPF 4, Policy 3 – Biodiversity requires developments to contribute positively to
biodiversity enhancement. Given the nature and land ownership constraints of marine fish
farming operations, it is not always feasible to provide direct on-site benefits. However, in
this instance, the applicant is considering additional biodiversity enhancement which may
implemented as part of the Carradale Shorebase landscape and biodiversity
enhancement strategy. The applicant is also collating a portfolio of biodiversity
enhancement projects across Scotland (including native tree plantation on Skye and
projects to improve smolt survival in the River Awe catchment). 
3.26. A condition is proposed requiring an update to be submitted on these projects, to the
satisfaction of the planning authority. Taking account of the above, it is considered that
the proposal would also accord with NPF4 Policy 3 relating to biodiversity enhancement.  
Ecological status of coastal and transitional water bodies and biological carrying
capacity (water quality & seabed impacts). 
3.27. The site is operating with a CAR license (SEPA reference: CAR/L/1131788) and SEPA
has confirmed no objection to the proposed changes to the operation of this site. Following
the submission of further information, SGMD have advised that they have no objection to
the proposals and there is no requirement for any further assessment regarding impacts
to the water column regarding water column impact. 
3.28. Subject to compliance with SEPA’s requirements it is considered that the proposal
would comply with Policy 59 – Water Quality and the Environment. 
Commercial and recreational activity (including other coastal/marine users (MOD)),
and navigational interests (including anchorages). 
3.29. With regards to anchorages, The Royal Yacht Association (YHA) advised they have
no objections to the proposal. As such it is concluded that there would be minimal impacts
on recreational marine vessels within the local area. The proposal will not present adverse
navigational safety issues, subject to navigational marking to satisfy Northern Lighthouse
Board requirements and an informative has been attached to secure this. 
3.30. With regards to the impact on commercial fisheries, there have been 11 objections
submitted by local fishermen and a sustained objection by The Clyde Fishermen’s’
Page 124

Page 125

LDP2 format template Nov 2023 
Association which is the membership body for 40 commercial fishing vessels within the
Clyde. This sustained objection is despite ongoing dialogue between the applicant and
the CFA (please see all representations provided in full in the Report of Handling Section
C), the submission of a Moorings Technical Analysis Report, subsequent changes to
reduce the proposed mooring area and the submission of a commercial fisheries impact
report. 
3.31. In terms of the impact of local fishing boats to access local fishing grounds, further
moorings design modelling was undertaken by the applicant which subsequently
confirmed the ability to reduce the indicative moorings boundary by 250m on the deep
water, eastwards side. In addition, the moorings boundary to the west of Carradale south
was adjusted eastwards by 56m, to facilitate improved access for creel fishermen (in
response to concerns raised by the CFA) on the inshore side of the fish farm. The total
development area (including moorings) for the original proposals subject to screening,
was 0.826km2 for Carradale North, and 0.818km2 for Carradale South. Following
consultation and the above revised technical moorings analysis, revised plans have been
submitted which reduce the extend of the mooring areas to 0.471km2 for Carradale North,
and 0.471km2 for Carradale South. A reduction of 13% compared to moorings area
presented in the originally submitted planning applications and approximately 95% of the
supplied AIS (fishing vessel) tracks are now out with the proposed mooring development
areas. The applicant notes that any potential displacement effect would be minor
compared to the present baseline position, with two operational fish farms in place. 
3.32. In addition to developing embedded site design mitigation to allow continued access
to fishing grounds and avoid (or reduce) displacement effects to commercial fishing the
applicant has committed to a number of operational mitigation measures to prevent
conflict with commercial fishing and to promote and facilitate fishing with and in close
proximity to the site: 
• Following site installation, the installed mooring anchor coordinates will be
shared with local fishing vessels/CFA and the relevant fisheries representative
bodies to allow bottom trawling to be undertaken as close to the mooring
infrastructure as safely possible. 
• If appropriate and subject to other navigational considerations and approvals
Mowi is content to provide for enhanced navigational markers for the anchor
locations to the east of the fish farms to develop a safe transit-trawling corridor
past the sites. 
• Following installation, the majority of the area taken up by the mooring lines for
each development proposal will still be accessible for static gear fishing with full
exclusion only required during maintenance of mooring lines or boat operations.
Mowi would be willing to work with potting (creeling) vessels to allow and mark
safe access and deployment of creels within the mooring’s footprint of the
development sites. 
• Mowi would be willing to work with the CFA to improve communications and
liaison with local commercial fishing vessels on farming operations and activities
(such as equipment installation) and to provide a mechanism whereby areas of
conflict could be discussed and resolved. 
3.33. To inform future discussions, the applicant has commissioned a Commercial fisheries
impact assessment from a revised pen layout at the Carradale fish farm Phase 1 Report
– Desktop Evaluation (October 2025). This Phase 1 report uses published information
and AIS records to characterise commercial fisheries in the project area in order to identify
and scope potential interactions with the farm infrastructure and operations. The report
finds that the proposed farm location is located just north of Carradale on the western side
of the Kilbrannan Sound within ICES rectangle 40E414. It is fished by vessels from two
Page 125

Page 126

LDP2 format template Nov 2023 
Scottish fisheries districts of Ayr and Campbeltown, landing mainly into Tarbert,
Carradale, West Loch Tarbert and Troon & Saltcoats. The site bathymetry varies from 66
m to 96 m (Carradale North) and 28 m to 51 m (Carradale South), with the deepest parts
of the site to the east. The main farm area appears to lie on an area of gravelly sand.
Outside the site, the substrate turns muddier in the deeper water to the east. Around
10,600 t of mainly shellfish are landed from the ICES rectangle 40E4, worth some £25.6
million per annum. This is characterised as follows: 
• Demersal trawls (691 t): Nephrops dominates (>99%) the catch. These trawl
caught Nephrops are mostly landed into Tarbet (255 t), Campbeltown (157 t) and
Troon and Saltcoats (139 t); this catch is worth around £4 million. There is a very
small catch of the bottom trawled finfish into Tarbert only.
• Dredges (178 t): The dredge fishery caught 178 t of scallops in 2023. This is mainly
landed in the West Loch Tarbert (96 t), Tarbet (35 t), Campbeltown (25 t) and
Carradale (22 t). There are also 46 t of scallops landed into Tarbert from passive
gears (apart from creels).
• Pots and traps (e.g. creels) (191 t): Nephrops are the major creel-caught species,
representing 71% of the catch of this passive gear type. Other target species of
creels are brown crab (C. pagarus; 9% of the creel catch), velvet crabs (7%) and
lobsters (also 6%). Creel-caught Nephrops are mainly landed into Tarbert (90 t),
with 18 t each being landed into Carradale and Campbeltown. 
3.34. It should be noted that these figures cover the c. 2,500 km2 of statistical rectangle
40E4 which is bisected by the Kintyre Peninsula, with the eastern side including
Kilbrannan Sound to the south and Loch Fyne to the north and that the proposed site’s
combined mooring area is just 0.82 km2. In terms of timing, the Nephrops caught by
trawl peaks over the summer but the creel fisheries are more evenly spread through the
year. The crab and lobster creel fishers tend to land during the second half of the year.
Scallops are landed mainly in late summer. 
3.35. A vessel activity analysis using mainly AIS data indicates that the proposed site
extension is right on the western edge of the mainly north / south (and vice versa) tows
of the bottom trawl fishery that extends eastwards across the Kilbrannan Sound. Based
on AIS data records over a five year period (2019 – 2024) only nine (1.4%) were within
the new proposed planning boundary and four (0.3%) were within the proposed mooring
boundary. This suggests that the planning boundary is the effective westward limit of
bottom trawling this side of the Kilbrannan Sound. This is around 300 m away from the
outermost pens under the current configuration and 225 m from the outermost pens under
the proposed configuration. 
3.36. The report concludes that the proposed move to the east will not have any significant
impact on bottom trawling activities, although there will be very little margin for error in
navigation. Although not confirmed, this is also likely to be the case for the smaller scallop
dredging fishing in the same area. As most creel boats do not have historical AIS track
records but keep private plotter records, crab and lobster creeling is likely to be located
in the rocky, shallower water of the western inshore part of the site. Nephrops creeling
could take place in the deeper, muddier sediments to the north and south of the pens. It
is possible that some creeling takes place within the extended proposed planning area
but given that it is sandwiched between the farm moorings to the west and the mobile
gear fishing zone to the east this is unlikely. 
3.37. The report identifies that further work would need to be conducted to verify these
results and where necessary establish the extent of the use of mobile gear to the east of
the site (esp. smaller vessels that might not use AIS) and creeling activity in and around
the proposed project site. Potential stakeholder groups are identified as the CFA, the
Page 126

Page 127

LDP2 format template Nov 2023 
Scottish Creel Fishermen’s Federation (SCFF) and possibly the West Coast Inshore
Fisheries Group. 
3.38. The CFA have responded to the commercial fisheries report. They note that with
regards to the reduced mooring area achieved through revisions, the relative productivity
of even a small area of fishing ground is the most important factor. They also note that
the report does not adequately consider the wider economic impacts of the creeling
industry to the UK economy. The CFA reiterate their frustration at ‘always being the losing
side’ when it comes to sharing marine spaces with other parts of the aquaculture industry.
However, it is noted in this occasion that the applicant has engaged comprehensively with
the CFA, conducted extensive additional analysis with the intention of minimising this
conflict as far as possible by avoiding or minimising potential for conflicts through revised
mooring extents and have proposed further operational mitigation measures and ongoing
engagement. 
3.39. To this end, it is considered that a reasonable compromise on the reduced physical
extent of the moorings - grounded in the analysis of the technical moorings report and the
commercial fisheries study analysis has been reached and despite the ongoing objection,
this is acceptable in terms of maintaining co-existence with an already consented marine
fish farm. Planning conditions have been agreed with the CFA and the applicant to secure
the operational mitigation and support the establishment of local engagement forums with
commercial fishing interests in Kilbrannan Sound to support the principle of co-existence
with the local commercial fishing activity. 
3.40. Taking account of the above, it is considered that proposal would accord with NPF4
policy 32 and LDP2 Policy 28 where they refer to impacts on other marine users. 
Amenity, arising from operational effects (waste, noise, light and odour). 
3.41. Impacts from marine aquaculture developments can include nuisance and disturbance
for local residents, recreational and marine users from lighting, noise and odour
associated with the installation and operation of fish farms. The applicant has provided
details of proposed mitigation measures (submitted statement: ‘Mitigation of amenity
impacts arising from operational effects’ September 2025) that will avoid or reduce
potential noise, lighting and odour impacts. These measures are part of the project design
(embedded mitigation) and good practice operational measures that would form part of
standard planning conditions for any fish farm development. 
Managing noise impacts 
3.42. With regard to noise, the development is located along a section of coastline which is
sparsely populated, apart from the village of Carradale which is located 1.8km to the
south.  It is noted that the operational activity at Carradale Harbour is an existing
contributor to background noise levels for residential receptors. 
3.43. Implementation of best operational practice measures will eliminate, reduce, or
manage any potential noise impacts from operational activities to levels within the limits
of background noise, and ensure that they are minimised to ensure there are no likely
significant effects from noise disturbance. Embedded project design and best practice
management measures include the use of noise insulation on equipment, particularly on
the feed barge, and restriction of operational activity to normal operational hours, as far
as practicable. 
3.44. A number of vessels will continue to support day-to-day operations at the farm
throughout various stages of the production cycle. The vessels will undertake routine
Page 127

Page 128

LDP2 format template Nov 2023 
husbandry and maintenance activities, including grading, administering treatments, and
harvesting. The reduction in pen units from 20 to 12 that will arise (across the combined
fish farm) from the planned developments will result in operational efficiencies. Fewer pen
units will require much less overall maintenance, such as net cleaning activity and fewer
pen units will also allow the whole farm to be treated in quicker timelines. Overall it is
anticipated that there will be a reduction in vessel traffic around the sites and associated
activities such as net cleaning which have a noise profile. 
3.45. It should be noted that although standard working hours are from 07:00 to 20:00 over
7 days, some operations may be required outside this period for reasons of fish health
and welfare. Operations may also need to be undertaken outside of standard working
hours due to tidal conditions at the site or as a result of delays caused by poor weather
(due to the limited windows in which smolts require to be transported and transferred). 
Also, during certain periods of the year equipment integral to the production cycle will be
required to run overnight (e.g. underwater lighting and aeriation systems). Planning
conditions are attached to mitigate the effects of all out of hours operations and ‘Well
Boat’ activity and further detail is set out below. 
Minimising light pollution 
3.46. The three main operational light sources are (1) underwater anti-maturation lights
placed into pens, (2) night-time operations, particularly involving ‘Well Boats’, and (3)
measures set out by NLB to ensure the proposed development is appropriately marked,
including navigational lighting. 
3.47. At certain times of the fish growth cycle underwater lighting in pens is required for the
purposes of preventing salmon maturation. Their window of use is from October to the
end of the following March. As they are placed at depth surface glare is limited. Embedded
design mitigation includes the use of low intensity lights, their correct downward
orientation and shielding to reduce upward surface glare. 
3.48. The applicant notes that to manage responsibilities for fish health and welfare it is
sometimes necessary to employ ‘Well Boats’ in a 24/7 operation at the site. However,
every effort is made during treatment planning and scheduling to minimise treatment
times and avoid evening working periods especially in locations with neighbouring
sensitivities. Where multiple pens require treatment, ‘Well Boat’ duration at a site can
increase. As a result, in winter, with reduced daylight hours it is not always possible to
avoid working during the hours of darkness and the use of lighting on these vessels. The
applicant recognises this can introduce potential conflict with light sensitive properties
nearby and has worked with ‘Well Boat’ operators to apply the following mitigation
strategies to avoid the potential for light nuisance from essential night time operations (As
per ‘Further supporting information’ Mitigation of amenity impacts arising from operational
effects submitted 12.9.2025): 
• Design and scheduling (where possible) of ‘Well Boat’ based treatments with the aim of
avoiding or reducing the frequency and duration of vessel treatment activity on site
extending beyond 8pm. 
• Positioning of ‘Well Boats’ on site, to avoid the pen working area between the vessel
and the shore (where practicable). 
• Reduction in intensity of lighting to minimum specifications required. 
• Application of shielding/covers to lights to avoid directional glare away from the working
area. 
• Switching off lights when not required, for instance for the duration of treatments once
fish have been loaded on the vessel.
Page 128

Page 129

LDP2 format template Nov 2023 
• Education, working with operators to understand light sensitive areas and the need for
operational efficiencies in use of lights and positioning of the vessel. 
• Review and identification of options for temporary, less sensitive, positioning locations
for ‘Well Boats’ away from farms once fish have been loaded for treatment. 
3.49. Navigational Lights and Marks are prescribed by the International Association of
Lighthouse Authorities, who class the navigational light (Special Mark) currently on site
as ‘minor lights’ with a nominal range of 2 nautical miles. The Northern Lighthouse Board
have advised they would require an additional Special Mark for the proposed
development, so that the outer corner of the pen moorings grid is indicated. These lights
flash yellow once every 5 seconds (off more than on). The feed barge displays an all-
round white light (this is the same light that a vessel at anchor must display). While
navigation lights are essential for safe navigation mitigations strategies to avoid potential
nuisances, include proper placement, maintenance, shielding and education on their
requirement with marine and local stakeholders. 
Odour & waste management 
3.50. With regard to waste, a Fish Waste Management Plan (July 2024) is currently in place
for the Carradale site and will remain in place.  This contains provisions to ensure the
development will be kept tidy and any rubbish found on the adjacent shoreline is collected
on a regular basis to minimise the impacts of marine litter.  This is consistent with NPF4
Policy 12 and LDP2 Policy 63. 
3.51. Odours from fish farms are generally associated with fish feed and storage of
mortalities. Feed will be stored within sealed silos inside the proposed feed barge
negating the risk of fugitive emissions associated with feed storage. Fish mortalities will
be collected in a cone located at the bottom of each pen and retrieved using an integrated
lift-up system. Site staff will aim to remove mortalities from the base of the pen on a daily
basis and three  times a week as a minimum. Stock mortalities removed from the pens
will be stored in sealed containers for disposal at a licensed facility. 
3.52. There will be no net increase in overall biomass as part of the proposed developments
arising and no increase in volume of waste produced is anticipated. There will be no
material change to existing processes dealing with mortality disposal in the farm
management area. 
3.53. In relation to well boat operations, the applicant has agreed to provide proactive
notification of fish movements (i.e. delivery and collection of smolts) to the Council a year
in advance to facilitate monitoring of any amenity impacts. This will be secured by
planning condition. It is acknowledged that the tidal nature of this site is a limiting factor
and may along with instances or poor weather, occasionally result in well boat use out of
normal operating hours. However, it is best operational practice to ensure fish loading and
harvesting happens during daylight hours to minimise amenity impacts as far as
practicable. 
3.54. It is considered that the impacts on amenity would be acceptable and would not conflict
with LDP2 Policy 14 – Bad Neighbour Development, NPF 4 Policy 32 or LDP2 Policy 28.
LPD2 Policy 29 – Existing Fish Farm Consolidation and Rationalisation requires that
redundant equipment be removed from sites to manage waste impacts.  A condition is
therefore proposed to this effect. 
Net economic impact, including local community socio-economic benefits such as
employment, associated business and supply chain opportunities. 
Page 129

Page 130

LDP2 format template Nov 2023 
3.55. NPF4 identifies the significant contribution aquaculture makes to the Scottish
economy, particularly for coastal and island communities. It also recognises that changes
in economic activity have potentially greater impacts on communities in rural Scotland
than more populated areas. The applicant has submitted further information which details
how Mowi Scotland activity supports Scotland’s rural employment levels which allows
traditional settlement patterns and land use activities to be maintained and helps to
sustain local rural services. 
3.56. It is further noted by the applicant that fish farming is uniquely placed to deliver actions
that will contribute to Argyll and Bute Council’s Economic Strategy and the focus areas of
People, Place, Planet and Prosperity with the company’s Argyll based operations
contributing to social and economic objectives. Examples showing how we are
contributing to social and economic benefits to the Kintyre peninsula are provided
throughout this response, including the following: 
• An existing community fund is in place for the operation of the Carradale Fish Farms
with Mowi contributing on an annual basis.
• Mowi, in partnership with Salmon Scotland and other farming companies, are working
with UHI Argyll to develop and deliver an Aquaculture SCQF4 academic qualification
with the practical classroom base elements to be delivered in Campbeltown,
Lochgilphead and Oban High Schools. Afterwards the students will then be placed on
work experience with a producer company.
• Mowi, has entered into a 3 year arrangement with the Campbeltown Picture House to
support the community operations and services provided 
Employment 
3.57. In terms of employment, the Carradale fish farms and the nearby Mowi North
Kilbrannan fish farm, consented in 2024, and also serviced from Carradale harbour
provide 16 direct jobs. The total number of direct jobs provided by Mowi across Argyll and
Bute is 75. The average basic salary of those employed by Mowi in the area is £35,059.
The Carradale fish farms have been established since 2009. In that time, they have been
successful operations from an economic, environmental, and social viewpoint. No new
jobs will be provided by the development proposals however the investment in this new
larger pen and net technology will future proof operations and employment levels ensuring
that the fish farms continue to be successful as fish farming in Scotland evolves. The
sector directly supports 540 jobs in Argyll and Bute, with local fish farms sites forming an
important part of the economy of rural communities. 
Annual Operational Expenditure 
3.58. Annual Operational Expenditure The cumulative operational annual expenditure for
the Carradale fish Farms in 2024 was £15M Within this figure, key local expenditures
include labour (£739k), repair and maintenance (£131k), other direct costs (£523k) and
indirect costs (£235k); a total of £1.63 million in 2024. Expenditure including feed, health
and insurance are not sourced locally, although may contribute to the wider national
economy. In 2024 Mowi, across all operations, spent over £14.5million directly with local
suppliers and service providers based in the Argyll and Bute council area. 
Proposed Capital Expenditure Arising from the Development Proposals 
3.59. The total capital expenditure for the development proposals for the Carradale North
and South fish farms, incorporating the new equipment, comprising 12 x 160m pens, 12
x fish nets and 2 x moorings grids and associated components is approximately £3.35
million. 
Page 130

Page 131

LDP2 format template Nov 2023 
Carradale Harbour Development Projects 
3.60. Following the recent commencement of fish farming operations at North Kilbrannan
and recognising the additional investment proposed for the Carradale fish farms, Mowi is
Mowi Scotland Limited, Farms Office, Glen Nevis Business Park, Fort William PH33 6RX
Registered in Scotland No. 138843 progressing a number of infrastructure improvement
projects in Carradale harbour, due to enhanced business needs. These will be delivered
in parallel with community benefit elements developed in consultation with the local
community with the shared aspiration to re-energise and improve the harbour environs.
The developments proposed include the following elements: 
• A pontoon for Mowi small personnel craft and defined local community boat
owners is proposed and has secured planning consent.
• A new shorebase for Mowi’s shoreside services and staff facilities is being
developed in the former (now remediated) scrap yard with a planning permission
recently granted.
• A renovation plan is being developed for the locally important and former (fire
damaged) Pier House and gardens, to bring the property back into residential use.
• A new community harbour building-facility will be provided by Mowi. The type of
building, use and location are being informed by a community consultation
exercise with the preferred option to be identified in partnership with the
community. 
Economic Value of Aquaculture to Argyll and Bute 
3.61. Aquaculture is an important part of the Scottish Marine economy. In 2022, aquaculture
generated £337 million aGVA, 0.20% of the Scottish economy and 7% of the marine
economy aGVA. Aquaculture employed 2,200 people, 0.08% of Scottish employment and
3% of marine economy employment. Of this, Atlantic (Scottish) salmon production
accounted for 96 per cent of all aquaculture value to the economy.1 Scottish salmon is
the UK's top food export, with sales worth £844 million in 2024. Exports of Scottish salmon
from the Argyll and Clyde regions rose to £125 million last year as demand for Scottish
salmon continues to grow. 
3.62. Given the above information it has been demonstrated that the proposed development
would have a positive economic impact in accordance with NPF4 Policy 25 – Community
wealth Building and NPF4 Policy 29 – Rural development which are supportive of rural
economic activity.  The proposal would also accord with LDP2 Policy 28, the aquaculture
specific policy which requires the economic contribution of aquaculture proposals to be
assessed. 
Potential benefits of sustainable site management proposals, which seek to mitigate
or reduce environmental risk from fish farming operations, including escapes,
disease and sea lice management and manage risk from fish farming operations,
including escapes, disease and sea lice management or manage risk through
adaptive management in response to environmental monitoring. 
3.63. The applicant notes the proposal to use fewer, larger pens than currently utilised at
Carradale is intended to benefit containment, sea lice management and fish health by
lowering the stocking density, improving water flow, and aiding the response, speed and
efficacy of management intervention. A number of documents have been submitted to
support the application and detail operational approaches to adaptive management of
environmental risks:
• Annex 3 Equipment Attestation 
Page 131

Page 132

LDP2 format template Nov 2023 
• Annex 4 Containment and Escapes Contingency Plan and Moorings Technical
Report 
• Annex 5 Sea Lice Management, Efficacy and Attestation 
• Annex 6 Waste Management Plans 
• Annex 7 Predator Mitigation Plan 
• Annex 9 Seascape, Landscape and Visual Assessment (Munro Landscape
(02.11.2023).  
• Kilbrannan Sound Environmental Management Plan (February 2024) 
3.64. In terms of sea lice management and the control of risk, the applicant notes that
effective sea lice management is a critical requirement to protect the health and welfare
of farmed fish and to minimise the risk of potential adverse impacts on wild salmonids.
The submitted material notes that poor management of sea lice not only generates
environmental impacts, but also a significant cost, primarily through compromised fish
health and performance. The applicant’s submitted supporting information entitled ‘Annex
5: Sea Lice Management, Efficacy and Attestation’ sets out its policies and aims for sea
lice management, before detailing the operational approach and resources that have
been implemented and applied at Carradale North and Carradale South marine fish farms
during previous cycles. It is noted that an integrated approach is used to meet regulatory
and industry guideline treatment thresholds for sea lice as well as the stricter operational
intervention thresholds that Mowi aspires to meet. The document also provides an
overview of other relevant fish health management procedures. 
3.65. In addition, an Environmental Management Plan (EMP) is in place for Kilbrannan
Sound. This commits to monitoring and reporting of lice burdens on farmed and wild fish,
a framework for cooperation and transparency and a framework for adaptive management
with feedback management measures to be taken in response to evidence of negative
impacts on wild salmonids.  As of 1 November 2025, SEPA has taken regulatory control
of sea lice interactions, with the proposed introduction of a national monitoring framework.
A planning condition has been attached to require an update of the EMP should the
monitoring framework mechanisms be revised. 
3.66. SEPA and SGMD have no objections to the proposals and a CAR permit is in place as
part of SEPA’s regulatory framework to manage environmental controls for marine fish
farms (SEPA reference: CAR/L/1131788). 
3.67. It is considered that the proposal would comply with this element of LDP2 Policy 28
and NPF Policy 32. The applicant has submitted supporting documents detail how the
development will be operated to minimise environmental risks and use mitigation and
monitoring where appropriate. 
Proposed operational measures which can mitigate or minimise the level of risk of
potential impacts (including on other aquatic or coastal interests). 
3.68.  NPF4 Policy 1 aims to encourage, promote and facilitate development that addresses
the global climate and nature crises while NPF 4 Policy 2 is supportive of developments
which have been sited and designed to adapt to current and future risks from climate
change. It is noted that marine aquaculture is seen as possible solution to global food
shortages that are predicted to increase as a result of climate change.  Wild Atlantic
salmon is not a sustainable food source. 
3.69. However, the industry has also been vulnerable to the effects of temperature rises
caused by climate change as evidenced by increased levels of mortalities.  Marine fish
farms in off-shore locations are also more vulnerable to the effects of storm events which
Page 132

Page 133

LDP2 format template Nov 2023 
are increasing as a result of climate change.  However, the Scottish Government Marine
Directorate are satisfied with the details of the equipment provided by the applicant. 
Equipment attestations and specifications have also been provided by the manufacturer
which state that the equipment has been designed in accordance with the Norwegian
standard to withstand the environmental conditions at the development location. 
3.70. A number of documents have been submitted by the applicant in relation to the
operation of the site (see above).  These include: Escapes Contingency Plan, Farm
Management Statement, Predator Mitigation Plan; and Farm Waste Management Plan.
The applicant has also provided a self-attestation to confirm that the proposed equipment
to be used is suitable for this site and an amended Moorings Technical Analysis Report
which details the inputs and results from a full technical dynamic analysis for the revised
pen and mooring system design, confirming compliance with applicable equipment design
requirements. Adherence to these matters will be secured through the use of planning
conditions. 
3.71. Subject to these conditions being complied with the proposal will accord with NPF 4
Policy 32 – Aquaculture and LDP2 Policy 28 – Supporting Sustainable Aquatic and
Coastal Development.  
Page 133

Page 134

LDP2 format template Nov 2023 
APPENDIX B – LIST OF CONTRIBUTORS 
OBJECTIONS 
1. James Anderson, Office, 110 Sound Of Kintyre, Campbeltown, PA28 6GA 
A further 11 proforma objection letters have been submitted by the following signatories: 
2. James Anderson, No address provided
3. Vytoldas Medeikis, No address provided 
4. John C Galbraith, No address provided
5. David Anderson, No address provided
6. James Coats, No address provided
7. L Ferguson, No address provided
8. Alasdair MacLean, No address provided
9. S Prentice, No address provided
10. Paul McAllister, No address provided
11. A Hamilton, No address provided
12. John Brown, No address provided 
Page 134

Page 135

© Crown Copyright and database right 2025
All rights reserved. OS license (customer) account number AC0000849384
Location Plan relative to; 24/01382/MFF
O
0 570 1,140285 Meters
Application Site
Page 135

Page 136

This page is intentionally left blank

Page 137

1 
ARGYLL AND BUTE COUNCIL  Planning, Protective Services and Licensing
Committee 
DEVELOPMENT AND INFRASTRUCTURE  17 December 2025 
JOINT PUBLIC HEALTH PROTECTION PLAN 2025-2027 
1.0 EXECUTIVE SUMMARY   
1.1 Purpose: This report invites Members to approve the Joint Public Health Protection Plan
2025-2027 which outlines our health protection priorities for the period and reviews the
previous plan.  This is a statutory plan, required under the Public Health etc. (Scotland) Act
2008, has been developed in conjunction with Argyll and Bute Council, Highland Council and
NHS Highland. It is also consistent with the Councils corporate priorities.   
1.2 The Public Health etc. (Scotland) Act 2008 outlines a range of statutory powers for the
purposes of health protection in a situation when action needs to be taken to protect public
health, sometimes against the expressed wishes of an individual or organisation. Under the
Act, health boards assume the lead role for health protection activities relating to people,
and local authorities retain the lead role for premises and property. The plan strengthens
the partnership approach between the three agencies and ensures that appropriate “health
protection arrangements” are in place between the Council’s environmental health service and
the Consultant in Public Health Medicine, NHS Highland,     
1.3 The plan was approved by Highland Council at their Communities and Place Committee on
the 6 November 2025 and is to be considered by NHS Highland Board in early course. 
1.4 Financial: The work will be undertaken principally by the Council’s environmental health
service with support from other areas of Regulatory Services. The plan has been developed
having regard to available resources and budget. As reported previously to Committee, the
resources available to Environmental Health have to be prioritised, focusing on areas of
greater public health significance.  Where statutory responsibilities require a higher level of
service standard, the team are continually exploring ways of delivering services more
efficiently.
.  
1.5 Recommendations 
Members are invited to: - 
(i) Approve the Joint Public Health Protection Plan for 2025-2027 (Appendix I), recognising
the key role of local authorities and environmental health 
(ii) Formally reaffirm the appointments of the Regulatory Services and Building Standards
Manager, as the Council’s Designated Competent Person under the Public Health etc.
(Scotland) Act 2008, and the appointments of Depute Designated Competent Persons
as detailed in section 4.8 of this report and 4.2 of the JHPP.  
(iii) Agree that the Regulatory Services and Building Standards Manager signs the JHPP
plan on behalf of the Council and takes the necessary steps to deliver the plan. 
Page 137 Agenda Item 7

Page 138

2 
ARGYLL AND BUTE COUNCIL  Planning, Protective Services and Licensing
Committee
DEVELOPMENT AND INFRASTRUCTURE 
17 December 2025 
JOINT PUBLIC HEALTH PROTECTION PLAN 2025-2027 
2.0 INTRODUCTION   
2.1   Local authorities have a significant role to play in public health and health protection. The Public
Health etc. (Scotland) Act 2008 place a requirement on NHS Boards to prepare, in conjunction
with local authorities, a Joint Public Health Protection Plan (hereafter referred to as JHPP) every
2 years. The plan requires to be formerly approved by each agency and outline the health
protection priorities for the forthcoming period of the plan.   
2.2 The Joint Health Protection Plan (JHPP) is prepared to ensure the requirements of the Public
Health etc. (Scotland) Act 2008 is carried out by Health Boards and local authorities.
Guidance on preparing the plan requires it to cover working arrangements and priorities for
the protection of public health.  The Plan is developed in conjunction with Argyll and Bute
Council, Highland Council and NHS Highland. 
3.0 RECOMMENDATIONS  
Members are invited to: - 
(i) Approve the Joint Public Health Protection Plan for 2025-2027 (Appendix I), recognising
the key role of local authorities and environmental health 
(ii) Formally reaffirm the appointments of the Regulatory Services and Building Standards
Manager, as the Council’s Designated Competent Person under the Public Health etc.
(Scotland) Act 2008, and the appointments of Depute Designated Competent Persons
as detailed in section 4.8 of this report and 4.2 of the JHPP.
(iii) Agree that the Regulatory Services and Building Standards Manager signs the JHPP
plan on behalf of the Council and takes the necessary steps to deliver the plan. 
4.0 JOINT PUBLIC HEALTH PROTECTION PLAN 2025-2027   
4.1 There is an expectation by the public that the NHS and Local Authorities undertake work which
keeps people and communities safe and have adequate arrangements in place to deal with any
incidents of disease which pose a risk to public health. This Plan details the extent of the health
protection work which is being undertaken. It focuses our Health Protection activity and
resources on key national and local priorities, provides a means to highlight our intentions and
to report on our actions/progress. 
.  
Page 138

Page 139

3 
4.2 Health Protection is the branch of public health which seeks to protect the public from being
exposed to hazards which damage their health and to limit any impact on health when such
exposures cannot be avoided.  This includes the prevention, investigation and control of
communicable diseases and environmental hazards. This work goes unnoticed, other than
during a major outbreak or incident where the investigation and control of disease is
paramount. 
Day-to-day work is undertaken principally by Environmental Health in the Local Authorities
and colleagues within the Health Protection team in NHS Highland.  The Plan seeks to ensure
that the standards defined by statute, or expected by society are met, namely that food is safe
to eat from commercial premises, that water is safe to drink, that air is safe to breathe, that
workplaces and other facilities/attractions (e.g. leisure facilities etc.) are safe to use and that
we have a good and healthy environment. Many of the areas covered by the plan match the
statutory duties of the Environmental Health team.   
4.3 The JHPP supports the existing close working relationships which exist between the three
bodies and helps ensure that we are able to respond effectively to a public health incident or
outbreak (e.g., E. coli 0157 outbreak, norovirus in the community, water and air quality issues). 
The plan also identifies national and local health protection priorities 
The Scottish Government and COSLA strategy ‘Public Health Priorities for Scotland’
emphasises the essential role of health protection work and workforce planning including
environmental health is being taken forward at a national level. 
4.4 The Plan, in Appendix I, is the sixth Highland JHPP, with the first plan being published in
2010 and targets resources at key national and local priorities and provides a number of key
benefits: 
I ensures that there are effective arrangements in place between Councils and the NHS to deal
with any incidents of disease or which pose a risk to public health. 
ii The Plan details the details the extent of the health protection works which is being undertaken
on a proactive and preventative basis  
Iii focusses our activity and resources on key national and local priorities, provides a means to
highlight our intentions and to report on our actions/progress.  
iv raises the profile of ‘health protection’ which largely goes unnoticed, other than during a major
outbreak or incident where the investigation and control of disease is paramount. The day-to-
day work is undertaken principally by environmental health to ensure that the standards are
met. 
v provides confidence to elected members, and others, that appropriate arrangements are in
place to respond to any suspected or confirmed outbreak or public health incident. 
4.5    Section 1.2 of the plan provides background on health protection and trends on communicable
disease.  Sections 1.4 and 1.5 details the challenges of providing health protection over the
areas given geography and the specific challenges to environmental health teams in workforce
planning and prioritising existing resources on areas of greatest public health significance.
Appendix II provides a useful infographic on the work of environmental health 
4.6 The national and local priorities identified for the period are given in Table 2 on pages 17-23 of
the plan.  These have been developed by the three bodies to ensure key health protection
priorities are addressed.  As stated in the plan, the local priorities recognise the work
undertaken by the environmental health teams in the following areas of responsibility and
service delivery. 
Page 139

Page 140

4 
(i) Protecting public health
(ii) Preventing the spread of communicable diseases in the community • Improving
standards of food safety 
(iii) Ensuring safe and potable drinking water supplies 
(iv) Improving standards of workplace health and safety standards 
(v) Promoting a safe environment and protecting the public from environmental hazards 
(vi) Providing safe private and short term let accommodation 
(vii) Ensuring adequate plans are in place to respond to incidents and emergencies 
4.7 Section 3 of the plan (pages 24-42) provides an overview of the work undertaken by the
partners over the period of the last plan, 2023-2025.  The plan notes that progress has been
made against almost all of the national and local priorities The established working
arrangements, promoted through this plan, proved to be effective in responding to
communicable disease outbreaks and general incident management (e.g., ad-hoc incidents
including avian influenza, health advice relating to a pollution incident, blue-green algae and
drinking water incidents).   
Some priorities have not been fully addressed due to new or emerging priorities or resourcing
issues.  These have been reviewed and where appropriate and relevant, are included in the
2025-27 JHPP.  The programme to review joint procedures was not progressed, as planned,
due to lack of available resources across all three agencies.  On reflection, the lack of having
an agreed timetable over the duration of the plan resulted in these reviews being delayed. 
4.8 Actions have been identified in section 3.2 of the Plan (page 44), to improve delivery of the
plan in the future: - 
(i) Provide a more structured timetable for the review of joint procedures.  This provides a
focus, supports resource deployment, and aids monitoring of the plan.  It is proposed that
all agencies meet on approval of the Plan, to implement this approach. 
(ii) To re-establish the multiagency agency Environmental Health Liaison Group. This will
build relationships with other agencies, support learning and sharing best practice, and
delivery of the JHPP. 
(iii) Regular meetings will be arranged to focus solely on delivering the Plan.  This will review
progress, revise priorities and consider emerging issues. 
4.9 To meet national guidance, the plan concludes by providing information on the operational
arrangements of the teams including specific health protection response plans, staff resources,
details of designated staff under the Public Health Act, mutual aid arrangements, and out-of-
hour arrangements.  Argyll and Bute Council require to appoint a Competent Public Health
Person, Deputes, and thereafter appointment of officers by the Local Authority Competent
Person. This provides flexibility in authorising officers to meet specific circumstances, workload
and demand, or new staff without having to amend the Plan or obtain Committee approval. 
It is recommended that the following appointments are made: 
Local Authority Designated
Competent Person
Alan Morrison, Regulatory Services and
Building Standards Manager
Depute Local Authority Designated
Competent Person
Mary Watt, Environmental Health Manager
(East)
Depute Local Authority Designated
Competent Person
Jacqui Middleton, Environmental Health
Manager (West)
Page 140

Page 141

5 
Depute Local Authority Designated
Competent Person
Mark Parry, Principal Environmental Health
Officer (Public Health) 
4.10  There are significant pressures on environmental health services due to a national shortage
of environmental health officers. These challenges are recognised by COSLA, and the
Scottish Government and work is ongoing with the Royal Environmental Health Institute of
Scotland (REHIS) and the Society of Chief Officers of Environmental Health in Scotland
(SoCOEHS) to increase resilience of the service and a sustainable workforce. A new MSc
Environmental health course at Abertay University commences in January 2026, and we have
secured a place for our Trainee EHO. 
As a consequence, Argyll and Bute Council have been operating without 4 Environmental
Health Officers and other posts for most of the last two years, despite repeated attempts to
recruit and the development of new career pathways.  Through our “grow our own” workforce
strategy, we presently have a Trainee EHO, a Regulatory Services Officer undergoing a
formal training pathway to become an EHO, and a Graduate Trainee Food Safety Officer.
This reduces our operational capacity meantime, but is a medium term solution to develop
Officers for the future. 
5.0 CONCLUSIONS   
5.1 Local authorities have a significant role to play in public health and health protection, and it is not
solely for NHS services. Much of the work of local authorities is preventative and reduces the
burden at primary care level. 
5.2 The Joint Public Health Protection Plan for 2025-27 meets the Council’s statutory obligations under
the Public Health (Scotland) Act 2008 
5.3 The Plan was agreed by Highland Council on the 6 November 2025 and will be considered by
NHS Highlands Board Following approval by all three agencies, the plan will be published to
demonstrate the work being done to protect the health of the people who live, visit and work in
the Highlands and Argyll & Bute. 
6.0 IMPLICATIONS   
6.1 Policy Consistent with Council priorities 
6.2 Financial The plan will be delivered within our current service, although progress is
dependent upon resource levels, other workload, and no reduction in resources 
6.3 Legal  Meets the Council’s legal obligations under Section 7 of the Public Health
(Scotland) Act 2008. 
6.4 HR None. 
6.5 Customer Service No significant issues. 
6.6 Risk:  Delivery of the plan is dependent on resources and will be impacted by 
staff absence, vacancies, new service demands, service cuts, or 
significant reactive work.
Priority will be given to delivering this plan, and the risks will be actively 
managed. In the event of an outbreak of incident, resources will be redirected 
from routine operational work 
6.7  Climate
Change
Climate change actions are included within the plan. 
6.8 Fairer Scotland
Duty
There are no implications.
Page 141

Page 142

6
6.9 Equalities-
protected
characteristics
No adverse impact
6.10
6.11
Consumer
Duty
Island 
communities
Positive
No impact
6.12 Children’s
Rights and
Wellbeing
No impact
Executive Director with responsibility for Regulatory Services
Policy Lead Councillor: Gordon Blair
For further information contact:  Alan Morrison, Regulatory Services and Building Standards
Manager, Tel: 01546 604292, email: alan.morrison@argyll-bute.gov.uk
j/9027
Appendices
Appendix I: Joint Health Protection Plan 2025-2027
Appendix II: Infogram illustrating the role of environmental health in public health
Page 142

Page 143

Joint Health Protection Plan 25-27 v1.0 Page | 1
NHS Highland Joint Health
Protection Plan (JHPP)
2025-2027
Prepared by Dr Jenny Wares, Mr Alan Morrison and Mr Alan Yates on
behalf of NHS Highland, Argyll and Bute Council and Highland Council
respectively
September 2025 – December 2027
Issued 19/9/25 v1.0
Appendix I
Page 143

Page 144

Joint Health Protection Plan 25-27 v1.0                Page | 2 
Contents
Introduction ..................................................................................................................... 3
1.1 The Joint Health Protection Plan ....................................................................... 4
1.2 Current context ................................................................................................. 5
1.2.1 Background ................................................................................................... 5
1.2.2 Recent activity .................................................................................................... 5
1.3  Health Protection Planning................................................................................ 8
1.4 Risks and Challenges ....................................................................................... 8
1.5 Capacity and Resilience ................................................................................. 10
1.5.1 Staffing .......................................................................................................... 10
1.5.2 Risk and mitigation ........................................................................................ 11
1.6 Supporting information .................................................................................... 12
Section 2: National and local Health Protection priorities .............................................. 13
2.1  Scotland’s Public Health priorities ................................................................... 13
2.2  Scotland’s Population Health Framework ....................................................... 13
2.3  Scottish Health Protection Network (SHPN) ................................................... 14
2.4 Horizon scanning ............................................................................................ 14
2.2 Local Priorities ................................................................................................ 16
Section 3: Review.......................................................................................................... 24
3.1 Review of Joint Health Protection Plan 2023-25 ............................................. 24
3.2 Review of Standard Operating Procedures, Protocols and Plans ................... 44
Section 4: Appendices ................................................................................................... 45
4.1 Appendix 1: List of joint NHS/Council Plans.................................................... 45
4.2    Appendix 2: Designated Competent Persons under the Public Health etc.
(Scotland) Act 2008 ................................................................................................... 46
4.3   Appendix 3: Supporting information ................................................................... 48
4.3.1 Health Protection ........................................................................................... 48
4.3.2. Overview of NHS Highland and its Local Authority partners ........................ 49
4.3.3 Resources and Operational Arrangements for Health Protection .................. 50
4.3.5 Emergency Planning and Service Continuity................................................. 54
References .................................................................................................................... 59
Page 144

Page 145

Joint Health Protection Plan 25-27 v1.0                Page | 3 
Introduction
The Public Health etc. (Scotland) Act 2008 requires NHS Boards, in consultation with
Local Authorities, to produce a Joint Health Protection Plan (JHPP) which provides an
overview of health protection priorities, provision and preparedness for the NHS Board
area.  Guidance on the content of JHPPs has been published by the Scottish
Government.1  
This is the sixth Highland JHPP, with the first plan being published in 2010. This
updated plan covers the period September 2025 to December 2027. It is a public
document and is available to members of the public on the NHS Highland website and
on request.  We hope that you will find this plan to be of interest, and of value, and that
its production will contribute to protecting the health of the people who live, visit and
work in the Highlands and Argyll & Bute. 
Signed: 
………………………………
Dr Jenny Wares
Consultant in Public Health Medicine (Health Protection)
NHS Highland, Assynt House, Beechwood Business Park, Inverness, IV2 3BW. 
……………………………..
Mr Alan Morrison
Senior Manager -Regulatory Service and Building Standards 
Argyll & Bute Council, Kilmory, Lochgilphead, PA31 8RT. 
………….............................
Mr Alan Yates
Strategic Lead - Environmental Health & Bereavement Services
The Highland Council, 38 Harbour Road, Inverness, IV1 1UF. 
Page 145

Page 146

Joint Health Protection Plan 25-27 v1.0                Page | 4 
Section 1: Overview 
1.1 The Joint Health Protection Plan
This plan has been created following the requirements set out in the Public Health etc.
(Scotland) Act 2008. NHS Highland, Argyll and Bute Council and Highland Council have
prepared this plan in collaboration and consultation. This plan is herewith referred to as
the Joint Health Protection Plan (JHPP). This updated plan relates to the period
September 2025 to December 2027.
The plan requires to be formally approved by the NHS Highland Board and the
appropriate Committees of each of the local authorities. The plan has been developed
in accordance with national guidance. 
The purposes of the plan are:
• To provide an overview of health protection priorities, provision and
preparedness for NHS Highland, Highland Council and Argyll & Bute Council.
• To outline the joint arrangements which Argyll and Bute Council, Highland
Council and NHS Highland have in place for the protection of public health. 
• To improve the level of preparedness to respond effectively to a health protection
incident and emergency.
• To clarify the priorities for the period of the plan 2025 – 2027 and to summarise
the outputs of the previous JHPP.
• To identify the resources which are required to meet the plan.
• To detail the liaison arrangements between NHS Highland, the two Local
Authorities and other Agencies (e.g. Scottish Water, SEPA etc.).
• To develop learning across the agencies.
• To provide a mechanism for reviewing and recording outcomes and
achievements.
The delivery of the plan will be subject to review at regular meetings. These
meetings will review progress, revise priorities and consider emerging issues. Minor
changes may be made to the plan as required without reference to the NHS
Highland Board and the appropriate Committees of each of the local authorities. 
The plan and its delivery will be formally reviewed and updated every two years in
accordance with the legislation.
Page 146

Page 147

Joint Health Protection Plan 25-27 v1.0                Page | 5 
1.2 Current context  
1.2.1 Background
Health Protection is an area of public health that is responsible for the surveillance,
prevention, investigation and management of communicable diseases and
environmental hazards in addition to incident and outbreak management. The outcome
of this is that the population’s health is protected from infectious and environmental
threats and major incidents and that across our communities, health inequalities are
reduced. 
Health Protection Teams (HPTs) within NHS Health Boards, work in partnership with
Environmental Health teams and other partners to support this area of work. The strong
working relationships have been fostered through many years of partnership working
and evidenced through the development of previous Joint Health Protection Plans which
demonstrates the effectiveness and importance of this JHPP process and document as
part of routine working but also as part of preparedness activity. 
1.2.2 Recent activity
Over the period of this JHPP, in addition to expected trends in infections, we have seen
exceptional levels of some infections as detailed below. 
Respiratory infections and vaccine preventable diseases:
From a respiratory perspective, the incidence of influenza reached exceptional levels
during the 2024/25 season which led to very high levels of hospitalisations secondary to
influenza. In addition to the impact on hospitalisation rates, the increased incidence also
impacted on our most vulnerable settings with outbreaks of infection affecting our care
homes. There is ongoing infection prevention and control education and training being
undertaken to support care home staff and care at home staff from an infection,
prevention and control perspective. 
Over the course of the plan, an increase has been seen with respect to the incidence of
highly pathogenic avian influenza (HPAI) with devastating effects on our wild bird
populations in 2023. Whilst we managed many potential exposures to avian influenza,
we did not identify any human cases of avian influenza. The three agencies have
worked closely in conjunction with other partners to increase our preparedness to
respond to a suspected or confirmed case(s), support both the response to detections
of HPAI in wild birds the safe removal of bird carcasses where applicable, and ensuring
that poultry keepers recognise the importance of having good biosecurity measures in
place and other legislative measures
Page 147

Page 148

Joint Health Protection Plan 25-27 v1.0                Page | 6 
Although discrete cases of meningococcal infection and invasive group A streptococcal
infection have been identified, we have not identified any clusters or outbreaks over the
period of the plan. 
Whilst cases of measles have been very rarely notified across Scotland in recent years,
the number of cases and outbreaks has increased significantly across parts of the UK
over the past couple of years. The increased incidence over 2024 was principally seen
in areas of England with almost 3,000 cases notified (n=2,911 laboratory confirmed
cases).2 Across Scotland, there were 24 laboratory confirmed cases in 2024 and one
case in 2023. Thus far this year in Scotland there have been 28 laboratory confirmed
cases of measles (as of 27th August).3 Whilst the incidence across Scotland has
increased this year, the increase has been driven by a number of clusters. This
increased incidence of measles is in the context of an increased incidence and
outbreaks globally compounded by declining vaccination uptake rates. This
necessitates ongoing vigilance and preparedness given the potential for importation of
infection and the need to prevent a resurgence of measles locally. Considerable work
has been undertaken from a preparedness perspective although an area necessitating
further work is that of supporting MMR uptake.  
It has been recognised that the pandemic disrupted established infection trends. After a
period of low incidence during and following the pandemic, there was a significant
increase in pertussis (whooping cough) seen from late 2023. This continued into 2024
with over 7,000 laboratory-confirmed cases of pertussis across Scotland in 2024
(n=7,051). This was higher than the annual case numbers associated with the last
significant outbreak of pertussis in Scotland in 2012/13 with 1,896 and 1,188 laboratory-
confirmed cases in 2012 and 2013 respectively.4 
Gastrointestinal infections:
Over the period of the plan, we have not identified any local outbreaks of infection and
the notifications of salmonellosis, cryptosporidiosis and Shiga Toxin-producing
Escherichia Coli (STEC) have been within seasonally expected trends. There continues
to be close partnership working across the agencies in response to cases of infection to
support source investigation and the prevention of further cases. 
Bloodborne viruses including hepatitis C (HCV):
Within Scotland, the Scottish Government made a commitment to treat more people
with hepatitis C with the aim of eliminating HCV infection and HCV related severe
disease and death as a major public health concern in Scotland by the end of the 2024
financial year. This was an ambitious target which sought to achieve elimination six
years ahead of the target set by the World Health Organisation.
Page 148

Page 149

Joint Health Protection Plan 25-27 v1.0                Page | 7 
Despite the ever-expanding treatment options, a significant proportion of HCV cases
remain undiagnosed. The high proportion of undiagnosed cases, combined with the
increasing range of HCV therapeutics underlies the need for effective approaches to
awareness raising, HCV case-finding, re-engagement and scale-up of treatment and
care. This work is being coordinated through the NHS Highland BBV Managed Clinical
Network. 
National treatment targets have been set by Scottish Government for NHS Boards. The
HCV treatment target for 2024/25 for NHS Highland was 67 based on a national target
of 2,500. Whilst we did not meet our treatment target, we did achieve a significant
increase in annual initiates compared to 2023/24. For 2024/25, we achieved a total of
61 initiates which equates to 91% of our board treatment target. The elimination goal for
Scotland as a whole was not met but that the progress for Highland was very positive
when compared across boards. 
In order to support elimination locally, the MCN is progressing a range of actions
pertaining to case-finding, testing, awareness-raising, access to care and research and
monitoring. One of the projects we implemented to support an increase in testing was a
pilot project of opt-out blood borne virus testing in the emergency department. This was
undertaken at Raigmore Hospital Emergency Department. This project was enabled
through additional funding received from Scottish Government following a successful
bid for funding. The aim of the project was to increase our case-finding activity for all
three BBVs through an increase in testing. A further benefit is that testing on an opt-out
basis in an Emergency Department setting would also provide more information in
relation to how prevalent these infections are in addition to raising awareness of BBVs
with staff and the public. As part of this project, everyone aged 16 and older who had a
blood test performed as part of their assessment in the Raigmore Emergency
Department received a test for Hepatitis B, Hepatitis C and HIV unless they opted-out.
This project has been completed and is currently being evaluated.  
The MCN is committed to supporting elimination of BBVs going forwards and will
continue to progress actions to increase testing, promote case-finding and to support
patients into care.
Local Authority Environmental Health
Local authorities have seen an increase in statutory work to be carried out, resulting in
new demands/pressures on existing resources. Workload has required to be
reprioritised according to risk. This additional work includes short-term let licensing and
enforcement, animal welfare licensing, additional responsibilities for health and safety
enforcement in care homes, and responding to incidents including
weather/storm/wildfire related incidents or formal enforcement activities  
Page 149

Page 150

Joint Health Protection Plan 25-27 v1.0                Page | 8 
1.3  Health Protection Planning 
The prevention, investigation and control of communicable diseases and environmental
hazards require specialist knowledge and skills. These include risk assessment, risk
management and risk communication amongst others. These specialist skills and
knowledge are applicable to a wide range of potential incidents or scenarios and are
often facilitated by the existence of agreed plans and procedures for specific diseases
or situations. There are many such national and local plans. 
Effective working arrangements are in place to support partnership working between
NHS Highland and the environmental health services within Argyll and Bute Council and
Highland Council. This is evidenced through work undertaken to develop common plans
to ensure a systematic and consistent approach to tackling common public health
issues and learning from best practice in both local authority areas and has been
demonstrated through the approach taken to the pandemic response.
A list of the plans which are common to all three agencies is included within appendix
1. 
Although excellent working relationships were already in place, the pandemic response
necessitated even closer working, and more regular meetings were convened to
support effective communication and information sharing between the three agencies.
This forum was felt to be very beneficial for sharing information and has been retained
on an ongoing basis on a bimonthly basis. 
1.4 Risks and Challenges
The geographical profile of the area presents several challenges to effective and timely
management of a health protection incident. This poses a risk to the delivery of the
service and further emphasises the importance of local knowledge and effective working
relationships to an incident response. From an NHS Board perspective, the NHS
Highland Board is the largest board in Scotland covering an area of 32,560km2 and
accounting for 42% of Scotland’s land mass. This vast geographical area means that
travelling arrangements must be factored into the planning of a response to an incident.
This is particularly the case for island communities where access is dependent on
ferries. There are 36 inhabited islands across both council areas. Many communities
are remote and can be isolated, particularly during periods of adverse weather or,
secondary to more limited transport such as a result of breakdowns or availability of
ferries. The maps of the area are provided in Appendix 3.
All three agencies are heavily dependent on effective telecommunications systems and
a poor telephone network coverage is a problem in some remote areas and some island
communities although this is improving. The response to a public health incident could
Page 150

Page 151

Joint Health Protection Plan 25-27 v1.0                Page | 9 
be compromised in the event of a significant failure of the telecommunications system
although MS teams is increasingly used to support communications. It is important to
note that a significant failure of the telecommunications system would have far-reaching
consequences across organisations and would not be limited to health protection and is
addressed within business continuity planning. 
Very infrequently, staff from all three agencies may be required to travel to the site of a
public health incident. This may necessitate several hours of journey time, increased by
the need for specific transport, availability of ferries, or adverse weather conditions. As
such the duration of deployment is increased. It is accepted that any reduction in
staffing for any of the agencies would impact even further on capacity to respond
appropriately and timeously to health protection incidents. This can in part be mitigated
by some of the communications improvements experienced in recent years.  
Collection and analysis of samples form a key step in the management of a disease
outbreak. The specimens are routinely delivered to the regional or national laboratories
by road/ferry or air. Meeting the turnaround time from submitting the sample to analysis
can be challenging particularly microbiological samples. In some more urgent
circumstances couriers and specialist transport including air transport should be used to
reduce sample transit time. 
NHS Highland collates the surveillance data and information relating to disease
outbreaks and environmental incidents and contributes to national surveillance work.
Local Authorities have systems in place for the investigating reported cases and for the
recording of investigative/monitoring work associated with health protection. These
systems include in-house case management systems and also include the use of the
Scottish Food Sampling Database (SFSD). The teams may also utilise Geographical
Information Management Systems (GIS). NHS Boards use HPZone, an online system,
which provides a standardised Health Protection IT system for national surveillance and
managing cases and incidents across the country. Developments are planned to enable
access to local authority environmental health teams to support joint investigations
going forwards. 
The 2025 National Risk Register includes information on 89 risks that would have a
substantial impact on the UK’s safety, security and/or critical systems at a national level.
A number of these are relevant for the JHPP including water supply incidents, food
contamination, poor air quality incidents, pandemic, outbreak of an emerging infectious
disease, outbreak of highly pathogenic avian influenza. 
All three organisations have local risk registers. These highlight specific high-risk
facilities, events or scenarios within each area and are also available through the
Regional and Local Resilience Partnerships – West of Scotland Regional Resilience
Partnership (RRP), Argyll and Bute Resilience Group, the Highlands and Islands Local
Resilience Partnership (HILRP) and the North of Scotland RRP.
Page 151

Page 152

Joint Health Protection Plan 25-27 v1.0                Page | 10 
As identified in the latest Climate Change Risk Assessment (CCRA3)5 there are
increasing risks posed by climate change with an increased risk of morbidity and
mortality from extreme weather events, possible changes in indoor and outdoor air
quality, vector-borne disease and an increased incidence of food poisoning and water-
borne infections. There are also increasing issues arising from wildfires, water scarcity
issues affecting private water supplies and supporting communities who may be
affected by landslides, flooding, power outages, or other weather-related incidents
The NHS Highland board area has one of the highest proportions of Private Water
Supplies (PWS) with over a quarter (n=6,161; 27%) of the total number of registered
PWS in Scotland occurring in the area.6 When compared to the mains supply, the
health risks from the consumption of water from a PWS are higher with an increased
risk of infections such as cryptosporidiosis and Shiga toxin-producing Escherichia coli
(STEC). The climate change predictions of drier summers interspersed with heavy rain
are likely to increase the risk of raw water contamination and increase the risk to human
health of water-borne infections, or lead to water scarcity issues. Both Local Authorities
have arrangements in place to support domestic users of private water supplies 
1.5 Capacity and Resilience
1.5.1 Staffing
Capacity and resilience continue to be ongoing challenges, particularly in response to
the current pressure on all services to reduce expenditure. Human resource capacity of
specialist health protection skills in NHSH, Argyll and Bute Council and Highland
Council is limited although there was a temporary expansion as a result of the pandemic
response. The expanded health protection function has been retained in NHS Highland
although not at the same levels as that experienced during the pandemic. 
Appendix 2 lists the designated competent persons in terms of the Act. NHSH services
are located in Inverness although cover the whole board area. The local authorities
deliver their services from a number of geographical centres. This approach within each
of the local authorities is an efficient use of limited human resources.  However, this
also creates small teams where the absence of an individual staff member stretches the
resources available to respond to an incident. Whilst the likelihood is extremely low, the
occurrence of two or more simultaneous incidents in different parts of the board area
would present significant challenges.  However, the pandemic demonstrated the
success of all three services to redirect resources to critical areas of activity, and for
other work to be paused meantime, based on a public health/health protection
assessment
There are particularly significant issues affecting local authorities, namely:
Page 152

Page 153

Joint Health Protection Plan 25-27 v1.0                Page | 11 
There is a national shortage of qualified Environmental Health Officers and whilst this is
being discussed nationally, the situation has led to resourcing difficulties in many local
authorities. The academic route to qualify as an EHO is currently very difficult with no
method of new entrants training to become an EHO in Scotland. Although a
replacement course is being planned, coupled with an aging profile, this is extremely
challenging situation to sustain the workforce. 
Argyll and Bute have long-term EHO vacancies and whilst new career pathways have
been developed enabling progression from authorised officer to EHO, this impacts
directly on resilience and capacity of environmental health services. Accordingly, the
challenge is to direct local authority resources to priority areas, at the expense of low
risk statutory activities.
Similarly, in Highland, the team have completed a workforce planning review in 2025 to
improve career pathways and provide a sustainable structure. In Highland three existing
technical officers are training to be EHOs with one student to qualify in 2026, and two
qualifying in 2027. Two Food Safety Officers have recently completed their training and
have successfully passed their professional qualifications.
An increasing workload with higher demands and expectations of customers and other
agencies. This includes new legislative duties which included animal welfare licensing,
short term let licensing in the last two years, and new duties proposed including non-
cosmetic procedures
Argyll and Bute Councils Regulatory Services carried out a service review in 2024 to
align it to current and emerging work and challenges, 
Public Services financial pressures continue to be challenging and impact directly on
service provision and priorities. 
1.5.2 Risk and mitigation
The nature of smaller teams in our smaller board areas is not unique to health
protection nor to the three respective agencies within this plan. Staff from the wider
department of public health are utilised as required in a large incident in addition to staff
from other teams/departments in NHS Highland as needed. Formal arrangements for
mutual aid with other NHS Boards in the North of Scotland and also NHS Greater
Glasgow and Clyde are in place and reviewed through the resilience procedures.
Informal arrangements for mutual aid exist within the local authorities and act to support
the provision of the service in remote and isolated areas. 
There is enhanced risk that low risk activities and businesses may become a higher risk
to public health through inadequate management etc., and that these will not be
Page 153

Page 154

Joint Health Protection Plan 25-27 v1.0                Page | 12 
identified and corrected via routine inspections by environmental health services. There
are a number of other preventative measures in place to mitigate this risk through:
• Provision of advice and guidance to business and individuals
• Targeted, intelligence led interventions, and liaison with other partner agencies
Notwithstanding this increased risk, priority will always be given to responding to public
health incidents and cases of suspected or confirmed communicable disease, by
redirecting resources to these investigations. 
1.6      Supporting information
Appendix 3 provides the following background information in support of the plan: 
• Health Protection definitions
• Overview of NHS Highland and its local authority partners
• Resources and operational arrangements for Health Protection
• Emergency Planning and Business Continuity
• Inter-organisation collaboration and mutual aid
• Out-of Hours arrangements
• Maintenance of competencies for Health Protection staff
• Public Feedback
Page 154

Page 155

Joint Health Protection Plan 25-27 v1.0                Page | 13 
Section 2: National and local Health Protection priorities
2.1  Scotland’s Public Health priorities  
As part of Public Health Reform the Scottish Government and COSLA, working with a
range of partners and stakeholders, developed a set of public health priorities to
improve Scotland’s health. The following priorities were published in 2018 and provide a
ten year focus for improving the health of the nation. 
Table 1: Scotland’s Public Health priorities
Priority 1: A Scotland where we live in vibrant, healthy and safe places and
communities
Priority 2: A Scotland where we flourish in our early years
Priority 3: A Scotland where we have good mental wellbeing
Priority 4: A Scotland where we reduce the use of and harm from alcohol, tobacco
& other drugs
Priority 5: A Scotland where we have a sustainable, inclusive economy with
equality of outcomes for all
Priority 6: A Scotland where we eat well, have a healthy weight and are physically
active 
It is acknowledged that the priorities do not reflect all of the activities that contribute to
the health of Scotland’s communities and that many activities are included in the
broader public health reform work but not explicitly reflected. The report7 on Scotland’s
six public health priorities states how, ‘our work to protect the health of the population
from serious risks and infectious diseases through vaccination, infection control and
incident response (health protection), will continue to be an essential public health
function and must be maintained. We will not compromise our existing, high-quality
protections and our ability to respond to emerging threats.’ 
2.2  Scotland’s Population Health Framework
In recognition of the need for a renewed and long-term focus on prevention across all
areas that affect health, Scotland’s Population Health Framework has been developed.
This sets out the collective approach to improving health and reducing health
Page 155

Page 156

Joint Health Protection Plan 25-27 v1.0                Page | 14 
inequalities which emphasises the shift towards prevention and early intervention. Initial
actions from a health protection perspective include:
Housing Support the contribution of better housing to
health.
Climate Change and Nature  Maximise efforts to tackle the climate and nature
emergencies given the close links between
environmental and human health.
Vaccination and Immunisation  Deliver the actions of the Scottish Vaccination
and Immunisation Programme (SVIP) 5 Year
Framework and Delivery Plan (2025-2030).
Health Protection Support better health protection in Scotland.
Sexual Health and Blood Borne
Viruses
Progress delivery of improvements to sexual
health and wellbeing. 
2.3  Scottish Health Protection Network (SHPN) 
The Scottish Health Protection Network (SHPN) is an obligate network of existing
professionals, organisations and groups within the health protection community across
Scotland. 
In line with the stated aims, the SHPN supports the development, appraisal and
adaptation of health protection guidance, seeking excellence in health protection
practice. The shared ownership of the network is one of its key strengths and all three
organisations contribute to the collective work of the network. Many of the work-streams
of both the HPT and the environmental health teams are directed by the work of the
SHPN and all three teams are committed to continuing to support the work of the
network. 
Furthermore, the Chief Medical Officer and Scottish Government have previously
identified various national health protection priorities as detailed within table 3. NHS
Highland JHPP commits to meeting these in the term of this plan. 
2.4 Horizon scanning
It is vital that we take a horizon-scanning approach to ensure that we are well prepared
for likely future threats or areas of increasing workload. Areas that will require further work
in future years include:
• Preparedness in relation to vector-borne diseases (VBDs): The epidemiology of
vector-borne diseases is evolving across the world, including the UK and Europe,
in the context of climate change which has expanded the geographic range of
environments suitable for mosquito and tick populations. From a UK perspective,
Page 156

Page 157

Joint Health Protection Plan 25-27 v1.0                Page | 15 
the bacteria causing Lyme disease and the virus causing Tick-borne encephalitis
(TBE) are now endemic in ticks and Usutu virus (USUV) is endemic in mosquitoes.
In addition, there is some evidence of West Nile Virus (WNV) detection in
mosquitoes in the UK. Whilst the risk posed by VBDs to human health in Europe
and the UK is difficult to accurately ascertain, evidence supports an increasing risk
to human health from vector-borne diseases.
• Increasing globalisation and international travel has led to an increase in the risk
of imported diseases such as Middle East Respiratory Syndrome Coronavirus
(MERS-CoV) and Viral Haemorrhagic Fevers (VHFs) such as Ebola. This risk is
likely to increase in the future. 
• Re-emergence of ‘eliminated’ diseases as seen with the outbreak of measles
seen across parts of England in recent years.
• Climate change is likely to result in more frequent and intense extreme weather
events in addition to the impacts of water scarcity.
• Declining vaccination rates and a rise in risk from the global ‘anti-vaccination’
movement which the World Health Organisation listed as one of its top ten
threats for 2019 and which continues to pose a threat to health.
• Following the COVID-19 pandemic, we know that the world will face another
pandemic. What we don’t know is when this will be and how severe it would be
which necessitates ongoing pandemic preparedness across organisations.
• Regulation of non-surgical cosmetic procedures which is an industry which has
expanded significantly in recent years. There is currently no regulation of non-
surgical cosmetic procedures although Scottish Government recently undertook
a further consultation on the licensing and regulation. This has resulted in
proposed legislation with implementation being explored.
• Food Safety. Food Standards Scotland are leading the SAFER project to develop
a new approach to food enforcement in Scotland whilst ensuring that food safety
and public health is protected.
• Housing – proposed legislation to improve energy efficiency in the private rented
sector (Minimum Energy Efficiency standards (MEES)
• Utilising digital technologies, including a pilot to extend the use of HPZone, an
online system, which provides a standardised Health Protection IT system for
national surveillance to local authority environmental health teams. This will
support joint investigations. 
Page 157

Page 158

Joint Health Protection Plan 25-27 v1.0                Page | 16 
2.2 Local Priorities 
Health Protection is a core part of the services delivered by NHS Highland through the
Public Health Department’s HPT and both Argyll & Bute and Highland Councils through
the protective services remits (environmental health, trading standards, licensing
standards and animal health and welfare). This plan recognises that work is undertaken
on a daily basis relating to the following areas of responsibility and service delivery:
• Protecting public health; 
• Preventing the spread of communicable diseases in the community;
• Improving standards of food safety;
• Ensuring safe and potable drinking water supplies;
• Improving standards of workplace health and safety standards;
• Promoting a safe environment and protecting the public from environmental
hazards;
• Providing safe private and short term let accommodation;
• Ensuring adequate plans are in place to respond to incidents and emergencies.
In addition, a number of local health protection priorities requiring joint action have been
identified which also acknowledge the need to address the current national health
protection priorities.  
The local priorities, which are detailed in table 3 below, will be progressed through the
incorporation within the operational service plans of each Local Authority or NHS
Highland, and where they are common, delivered through effective working and
partnership between the agencies.
It has also been recognised that there is a need to increase the visibility of health
protection and the impact that the function has to support wider awareness raising with
stakeholders. In light of the current financial challenges, there is also a need to better
demonstrate the return on investment provided by the work of the service. This is a
shared priority across each of the three agencies and will be progressed within the time-
frame of the plan. 
Page 158

Page 159

Joint Health Protection Plan 25-27 v1.0                Page | 17 
Table 2: National and Local Priorities 
Source Outcome Work plan Agencies Involved
1. National
priority
Support the contribution of
better housing to health
• Utilise Private Landlord Registration scheme to assist with improving housing
conditions in the private rented sector and reducing antisocial behaviour.
• Continue working on strategies to improve housing conditions including licensing of
HMOs and residential mobile home sites.
• Ensure that properties provided for short-term let are safe for use, have adequate
facilities and do not adversely impact on communities. 
• Engage on proposed legislation to improve energy efficiency in the private rented
sector (Minimum Energy Efficiency standards (MEES)
Highland Council
Argyll & Bute Council
2. National
priority
Maximise efforts to tackle the
climate and nature
emergencies given the close
links between environmental
and human health.
• Work together to mitigate the effects of climate change. Some of the specific
examples include supporting the response to water scarcity events in addition to
supporting the public health response to wildfires.
• Continue to support the implementation of renewable energy installations and the
response to concerns regarding health impacts of developments., including
windfarms and battery storage sites 
NHS Highland
Highland Council
Argyll & Bute Council
3.  National
priority 
Reduce Vaccine Preventable
Diseases 
The delivery within NHS Highland contributes to Scotland’s Vaccination and
Immunisation Programme (SVIP) and Scotland’s over-arching mission to deliver a world-
leading, person-centred and public health led vaccination and immunisation service. Our
local objectives align to the goals set out within Scotland’s 5-year vaccination and
immunisation framework and the vaccination standards set for NHS Boards as part of
the Annual Delivery Plan. 
There are recognised inequalities with respect to immunisation programmes with uptake
rates lower in more deprived communities with reducing inequalities a key aim for all
involved in immunisation programmes.
• Ensure models of delivery are targeted to support increased uptake across our hard-
to-reach groups and underserved populations in order to address existing health
inequalities
• Deliver the Vaccination Transformation Programme by implementing models of
delivery that fit a rural area and ensure continued high levels of vaccine uptake in all
childhood and adult programmes.
• Develop and implement a local plan for delivery of the SVIP Five Year Vaccination
and Immunisation Framework
• Implement the national childhood schedule change at a local level.
NHS Highland
Highland Council
Argyll & Bute Council
Page 159

Page 160

Joint Health Protection Plan 25-27 v1.0                Page | 18 
4. National
priority
Progress action towards
elimination of Hepatitis C
(HCV), Hepatitis B (HBV)
and HIV
As detailed earlier, the Scottish Government has made a commitment to treat more
people with hepatitis C with the aim of eliminating HCV infection and HCV related severe
disease and death as a major public health concern in Scotland. The high proportion of
undiagnosed cases, combined with the increasing range of HCV therapeutics underlies
the need for effective approaches to awareness raising, HCV case-finding, re-
engagement and scale-up of treatment and care. This work is being coordinated through
the NHS Highland BBV Managed Clinical Network. 
National treatment targets have been set by Scottish Government for NHS Boards. The
HCV stretch target for 2025/26 for NHS Highland is 67. 
• Coordinate actions to support the achievement of NHS Highland’s stretch target for
HCV.
• Finalise the draft local strategy and action plan for the elimination of hepatitis. 
• Implement actions to support HIV transmission elimination. 
NHS Highland
Highland Council
Argyll & Bute Council
5. National
priority
Reduce the incidence of
tuberculosis (TB) 
The Scottish Government has commissioned a review of TB services in Scotland which
has been delivered by the Royal National Orthopaedic Getting It Right First Time
Projects Directorate (RNOH/GIRFT). The core principle of the programme is a clinically
led, peer-to-peer review, data driven approach to healthcare improvement. 
Information from each TB service provider, through completion of an in-depth survey,
has been collected to enable an analysis of the service provision in Scotland. This was
collated and analysed alongside the TB surveillance data. Following this, a data-pack
was developed and used to support a deep dive visit locally. This was very positive and
a report has been developed for NHS Highland. 
• Consider the recommendations of the local report in the context of the national
recommendations and develop an implementation plan. 
NHS Highland
6. National
priority
Support better health
protection in Scotland
A group has been convened to develop a consensus position statement
for health protection which will include the key areas for priority action going forwards.
This is in the context of the publication of the population health framework. The group is
a multidisciplinary group with input from HPTs, EHOs, PHS and DsPH with geographical
representation included. 
• Support the implementation of any recommendations of the position statement.
NHS Highland
Highland Council
Argyll & Bute Council
7. National
priority
Addressing health
inequalities (in addition to
actions within other priority
areas)
• Review approaches to incivilities to identify good practice and specific projects to
implement. Incivilities can include issues such as vandalism, graffiti, litter, dog-fouling
and fly-tipping.
• Implement short term let licensing regimes with the aim of securing safety within
premises used for this purpose and safeguarding communities
• Support Resettlement Programs to ensure that accommodation provided is safe and
has adequate facilities and services. 
• Support the empty homes strategy aimed at encouraging improvements to properties
in order to bring them back into housing use.
Highland Council
Argyll & Bute Council
Page 160

Page 161

Joint Health Protection Plan 25-27 v1.0                Page | 19 
8. National
priority
Monitoring and Improving
drinking water quality
• Collaboration between all three agencies and Scottish Water in the monitoring and
improvement of public and private water supplies.
• Work with DWQR to deliver the requirements on Private Water Supplies.
• Deliver a joint training day between all three agencies and Scottish Water to support
the education and training of all stakeholders.
• Work with stakeholders to implement the DWQR requirements in relation to
perfluoroalkyl and polyfluoroalkyl substances (PFAS)
NHS Highland
Highland Council
Argyll & Bute Council
9. National
priority
Food control • Ensure effective communication routes of communication for rapid dissemination of
alerts regarding food-borne infections
• Continue to raise awareness of the health implications of glycerol and to ensure that
businesses are aware of the FSS guidance.
• Reinstate food control enforcement services and deliver a range of food interventions
in respect of the national Food Safety Code of Practice.
• Working with FSS, develop a new approach to food enforcement in Scotland
(SAFER) whilst ensuring that food safety and public health is protected.
• Continue to contribute to and  support both national and local food surveillance
programmes  
NHS Highland
Highland Council
Argyll & Bute Council
10 National
and local 
Public Analysts Services • Monitor the Improvement Services review of Scottish Local Authority Public Analyst
Services and consider the impact to local authority service provision
Highland Council
Argyll & Bute Council
11 National
and local 
Regulation of non-cosmetic
procedures 
• Scottish Government propose to issue legislation to regulate this sector, with
responsibility for specific sectors falling to local authorities. Councils require to
implement these new licencing and enforcement regimens 
Highland Council
Argyll & Bute Council
12. National
priority
Control Environmental
exposures which have an
adverse impact on health
• Tackle the effects of antisocial or excessive noise in the community.
• Deliver on air quality standards within each local authority area. 
• Review approaches to swimming pools and spas to ensure appropriate controls are
in place regarding infection control.
• Blue-green algae - Promotion of safe usage of recreational waters where there is a
risk of BGA, implementation of permanent signage and responding to incidents that
occur.
• Progress Contaminated Land strategies and ensure land is made suitable for use
through development management.
• Monitoring of bathing water quality (designated beaches/lochs) with SEPA.
• Apply the regulations for legionella safety in public buildings.
NHS Highland
Highland Council
Argyll & Bute Council
Page 161

Page 162

Joint Health Protection Plan 25-27 v1.0                Page | 20 
• Monitor the levels of lead in private water supplies and assist properties on mains
supplies to encourage owners/users to carryout repairs to remove/reduce the lead
contamination risks and improve water quality.
13. Local
priority
Resilience to respond to
pandemics through effective
multi-agency response
• Implement the ongoing learning from the pandemic as this is developed.
• Review business continuity plans and pandemic plans in light of the learning from the
COVID-19 pandemic
NHS Highland
Highland Council
Argyll & Bute Council
14. Local
priority
Effective sea and airport
health plans to provide
adequate disease control
measures
• Review existing sea and airport health plans across Argyll and Bute Council and
Highland Council to include arrangements for any imported disease.
• Hold a desktop exercise to test these plans.
NHS Highland
Highland Council
Argyll & Bute Council
15. Local
priority
Enhance recovery planning
for a major incident
• Review and further develop the generic Recovery Plan outlining multi-agency
responses. 
• Exercise recovery plan for major flood or events.
• Contribute to Regional Resilience Partnerships.
• Continue implementation of Care for People guidance.
NHS Highland
Highland Council
Argyll & Bute Council
16. Local
priority
Ensure effective surveillance
is in place which supports
local and national needs
• Develop and circulate a survey for stakeholders with respect to surveillance needs to
ensure that these are best met for ongoing surveillance and monitoring of
communicable diseases
• Continue to monitor the performance of current surveillance and reporting activity.
NHS Highland
17. Local
priority
Effective and proportionate
arrangements in place to
protect public health
• Revise joint health protection policies and procedures between all three parties as
appropriate. 
• Review existing arrangements/plans as a routine part of each incident that occurs.
• Undertake specific exercises for the purposes of training and evaluation of
contingency plans relating to water and waste-water incidents and the recovery
phase following a radionuclide incident.
• Consider key performance standards for the response, investigation and actions for
public health incidents
• Joint training in managing incidents/outbreaks and chairing these meetings such as
STAC. 
• To investigate and take appropriate action in response to service requests which
have the potential to impact adversely on the environment or to public health.
• Joint protocol to be devised to manage vulnerable individuals displaying hoarding
behaviour or whose lifestyle behaviour affects others.
• Collate the objectives underpinning the workplan to support joint monitoring across
the agencies. 
NHS Highland
Highland Council
Argyll & Bute Council
Page 162

Page 163

Joint Health Protection Plan 25-27 v1.0                Page | 21 
18. Local
priority
Minimise the risk to the
public from Lyme Disease
and other vector-borne
diseases
• Assist with ongoing research and reviews. 
• Continue to raise public awareness.
• Review and develop websites/links to provide suitable information.
NHS Highland
Highland Council
Argyll & Bute Council
19. Local
priority
Reducing the impact of
tobacco, alcohol and other
harmful substances on public
health
• Continued regulation of the smoking ban in enclosed and public places including
NHS premises. 
• Continued work with licensed trade in respect of responsible drinking and minimum
pricing.
• Continue regulatory work on age-related sales activity of cigarettes, and other
products.
• Promotional campaign targeted at reducing the under-age sale of tobacco and
vaping products to children and young adults.
• Joint working with the police relating to the sale of Novel Psychoactive Substances
(NPS). 
NHS Highland
Highland Council
Argyll & Bute Council
21 Local
priority
Strong and Safe
Communities
• To investigate and implement effective controls to minimise the spread of suspected
and confirmed cases of communicable and notifiable diseases in the community.
• The protection of the vulnerable in communities from the impact of cold calling and
rogue traders.
NHS Highland
Highland Council
Argyll & Bute Council
21. Local
priority
Radon protection • Ensure that the public in radon affected areas are provided with adequate
information relating to the risks of radon and the mitigation measures which can be
taken to reduce the risk.
• Raising awareness of radon monitoring responsibilities to employers and landlords.
• Produce a Radon Strategy for ABC to include council owned property and rented
property.
• Ensure Radon awareness through development management.
NHS Highland
Highland Council
Argyll & Bute Council
22. Local
priority
Education and advice
programme
• Develop a communications calendar which includes communication drafts and
templates which can be used at different points in the year to raise public and
professional awareness of hazards and preventative actions to take
• Raising awareness of the Outdoor Code and communicable disease and controls
through improved public information.
• Development and review of existing information leaflets and improvements to
website.
• Increase awareness of health protection issues with local businesses through use of
alternative enforcement plans.
NHS Highland
Highland Council
Argyll & Bute Council
Page 163

Page 164

Joint Health Protection Plan 25-27 v1.0                Page | 22 
23. Local
priority
Preventing and minimising
the spread of infection
• Investigation of suspected and confirmed cases of communicable disease and
implementation of appropriate controls to prevent further spread.
• Monitoring trends by enhanced surveillance and reporting. 
• Implement the national microbiology strategy locally and ensure appropriate access
to testing in the public analyst labs.
• Ensure public health actions are taken to minimise risks from zoonotic infections
reported by Scottish Veterinary Service (SVS).
• Ensure animal related visitor attractions present safe environments for all visitors
NHS Highland
Highland Council
Argyll & Bute Council
24. Local
priority
Food safety priorities • To undertake the duties as statutory Food Authority in protecting food safety in the
food industry and deliver the Councils’ Food Safety Law Enforcement Work plan.
• Work with FSS and other partners to develop a new approach to food control enforcement in
Scotland (SAFER) whilst ensuring that food safety and public health is protected.
• Work nationally with relevant LA partners and the FSS to ensure FBOs manufacturing
unpasteurised cheese are safe to do so considering the E.Coli STEC & L. monocytogenes
risks. 
• Continue to work with the FSS/SFELC and relevant LA partners to improve the verification of
FCMs in FBOs who manufacture cold smoked fish contributing to national response to the UK
wide outbreak
Highland Council
Argyll & Bute Council
25. Local
priority
Health and safety at work
initiatives 
• To complete the Councils’ Health and Safety at Work Law Enforcement Plan. Highland Council
Argyll & Bute Council
27 Local
priority 
Horizon Scanning and
Emerging Infections
• Be aware of new and emerging infections and plan how to minimise their impact
locally.
• Implement the forthcoming legislation of non-surgical cosmetic procedures. 
NHS Highland
Highland Council
Argyll & Bute Council
28. Local
Priority
Animal health and zoonoses • Respond to current and emerging diseases such as the risks from avian influenza.
• Deal with the illegal import of animals.
• Carry out animal health and welfare enforcement activities in accordance with
Framework Agreements.
• Improve preparedness to deal with animal health disease outbreaks.
• Work with PHS to implement the Q-fever SOP and deliver additional education to
support this locally.
NHS Highland
Highland Council
Argyll & Bute Council
29. Local Workforce planning and
resilience
• Training and support in incident management and response including STAC 
• Support the development of Environmental Health Officers and other professional
staff within Council  services as part of our workforce strategy, to provide adequate
capacity and resilience
NHS Highland
Highland Council
Argyll & Bute Council
30. Local Water safety plans • Promote water safety through Water Safety Partnerships with other agencies
• Review water based activities to promote safety for all involved.
NHS Highland
Highland Council
Argyll & Bute Council
Page 164

Page 165

Joint Health Protection Plan 25-27 v1.0                Page | 23 
31. Local Coordinated approach to
public health
• Progress proposal to pilot Epi-Q on HPZone
• Actively participate in the national Scottish Health Protection Network and associated
governance groups to promote a coordinated approach to protecting public health
and developing new guidance and systems.
NHS Highland
Highland Council
Argyll & Bute Council
32. National/L
ocal
Housing Emergency • Delivery of Housing Emergency Action plans  Argyll & Bute Council
33 National
and local 
Serious and Organised Crime  • Work with other regulators to target activity to detect and disrupt organised crime and risks to
public health/health protection 
Highland Council
Argyll & Bute Council
Page 165

Page 166

Joint Health Protection Plan 25-27 v1.0                Page | 24 
Section 3: Review
3.1 Review of Joint Health Protection Plan 2023-25
In preparing the JHPP 2025-27, we have considered the findings of the review of the previous JHPP. This review
identified that work has progressed well against the plan with good progress noted against almost all of the national
and local priorities.
The established working arrangements, promoted through this plan, proved to be effective in responding to
communicable disease outbreaks and general incident management (e.g. blue-green algae, drinking water incidents) 
Some priorities have not been fully addressed due to new or emerging priorities or resourcing issues.  These have
been reviewed and whether appropriate and relevant, are included in the 2025-27 Joint Health Protection Plan. 
The program to review joint policies and procedures was not progressed, as planned, due to lack of available
resources across all three agencies.  On refection, the lack of having an agreed timetable over the duration of the
plan, resulted in these reviews being delayed 
In reviewing the 23-25 plan and achievements, a number of actions were identified to how we deliver the plan in the
future.
o Provide a more structured timetable for the review of joint procedures. This provides a focus, supports resource
deployment; and aids monitoring of the plan. It is proposed that all agencies meet on approval of the Plan, to
implement this approach
o To re-establish the multiagency agency Environmental Health Liaison Group. This will build relationships with
other agencies, support learning and sharing best practice, and delivery of the Joint Health Protection Plan
o Regular meetings to focus solely on delivering the Plan. This will review progress, revise priorities and consider
emerging issues 
Page 166

Page 167

Joint Health Protection Plan 25-27 v1.0                Page | 25 
Outcome Work plan Argyll & Bute Council
actions/comments
Highland Council
actions/comments
NHS Highland
actions/comments RAG Status
Reduce Vaccine
Preventable
Diseases 
Deliver the Vaccination
Transformation Programme by
implementing models of delivery
that fit a rural area and ensure
continued high levels of vaccine
uptake in all childhood and adult
programmes.
- - A process of significant
service redesign is being
undertaken to develop a
collaborative hybrid model
in Highland HSCP. This will
involve a collaborative
delivery model with input
from general practice and
vaccination teams. A review
of existing flexibility is also
being undertaken in A&B
HSCP.
A
Reduce the
incidence of
tuberculosis (TB) 
Implement the actions within the
Scottish Tuberculosis (TB)
Framework including that of the
development of an overarching
policy for the management of latent
tuberculosis. 
- - Scottish Government
commissioned a review of
TB services in Scotland
using the Getting It Right
First Time (GIRFT). The
review was very positive for
NHS Highland with
excellent feedback in
addition to
recommendations for
further consideration. 
In addition, a business case
has been developed
nationally and submitted to
Scottish Government in
relation to screening for
latent tuberculosis.
G
Progress action
towards Hepatitis C
(HCV) elimination  
Implement any actions and
recommendations developed as
part of national SHBBV policy. One
specific area of work will be
updating NHS Highland’s HCV
Elimination Plan. 
- - Funding was successfully
secured to implement a
blood-borne virus (BBV)
opt-out testing pilot in the
Emergency Department.
In terms of progress against
our treatment targets NHS
Highland was joint top with
G
Page 167

Page 168

Joint Health Protection Plan 25-27 v1.0                Page | 26 
Outcome Work plan Argyll & Bute Council
actions/comments
Highland Council
actions/comments
NHS Highland
actions/comments RAG Status
91% of our treatment
initiate target achieved.  
NHS Highland also
achieved the highest
proportion of admissions
tested in prisons when
compared across all
prisons in Scotland. 
Addressing health
inequalities
Utilise Private Landlord Registration
scheme to assist with improving
housing conditions in the private
rented sector and reducing
antisocial behaviour. 
Delivery of statutory work
associated with landlord
registration scheme
Successful recruitment of
Private Landlord Registration
team to ensure suitable and
continued implementation of
the Private Landlord
Registration scheme.
Private Landlord
Registration scheme well
established in Highland
-
G
Continue working on strategies to
improve housing conditions
including licensing of HMOs and
residential mobile home sites. 
Service requests continue to
be investigated, which can
involve investigation of
statutory nuisance complaints.
Processing of residential
caravan site and HMO licence
applications. Argyll and Bute
Council also declared a
“Housing emergency” in June
2023 due to “consistent
reduction in the supply of
housing, a steady increase in
demand for housing across all
tenures and increasing levels
of un-affordability".  
Work ongoing to improve
housing conditions,
monitor HMOs and
licence residential
caravan sites. Highland
Council declared a
Housing Challenge and
agreed a number of
strategic objectives in
June 2024. A Housing
summit was held with
partners in October 2024.
-
G
Review approaches to incivilities to
identify good practice and specific
projects to implement. Incivilities
can include issues such as
vandalism, graffiti, litter, dog-fouling
and fly-tipping.
LEAMS surveys completed
monthly of street condition and
cleanliness and these
submitted to “Keep Scotland
Beautiful”. 
Dog fouling and litter
patrols regularly
undertaken to target worst
affected areas in
Highland. Use of mobile
CCTV for fly-tipping being
-
G
Page 168

Page 169

Joint Health Protection Plan 25-27 v1.0                Page | 27 
Outcome Work plan Argyll & Bute Council
actions/comments
Highland Council
actions/comments
NHS Highland
actions/comments RAG Status 
Vandalism – targeted specific
areas and have deployment of
mobile CCTV.   
Dog fouling –ongoing
promotion of responsible dog
ownership and targeted
enforcement.
reviewed. Joint working
with DVLA to target
abandoned & nuisance
vehicles. 
Implement short term let licensing
regimes with the aim of securing
safety within premises used for this
purpose and safeguarding
communities 
Short-term let licensing in
place at 3064 licences issued.
Policies revised to implement
changes to legislation or
improvements to the scheme
In Highland over 8500
licence applications have
been processed. The
implementation of the
scheme 
will continue to be a
priority and requires
significant resource going
forward to conduct 
compliance monitoring,
complaint investigation
and licence renewals.
-
G
Support the Ukrainian Resettlement
Program and ensure that
accommodation provided is safe
and has adequate facilities and
services. 
181 property inspections
completed Council wide, to
ensure that properties used for
the Ukrainian Resettlement
program met requirements
Environmental Health
support the on-going
Ukrainian
resettlement team in
conducting property
inspections.
-
G
Support the empty homes strategy
aimed at encouraging
improvements to properties in order
to bring them back into housing
use.
First Council to announce
Housing Emergency and
action plan in place. Award
winning Empty Homes team 
Environmental Health
support the Council’s
Empty Homes team 
-
G
Minimise the risk to
the public from Shiga
toxin-producing E.
coli (STEC) infection
Implement any outstanding
recommendations within the VTEC
Action Plan for Scotland. 
The guidance for STEC has
been implemented and is
mainstreamed into operational
work.  
The guidance for STEC
has been implemented
and is mainstreamed into
operational work.  
The guidance for STEC has
been updated nationally
and implemented locally.  G
Page 169

Page 170

Joint Health Protection Plan 25-27 v1.0                Page | 28 
Outcome Work plan Argyll & Bute Council
actions/comments
Highland Council
actions/comments
NHS Highland
actions/comments RAG Status
Improve the safety of private water
supplies and ensure that public
health interventions are taken for
any failing drinking water supplies,
whether public or private. 
Risk assessments completed,
“boil notice” applied as
immediate intervention,
investigations completed
following adequate remedial
action by clients. 
Carried out routine compliance
sampling and resampling as
per monitoring programme. 
Incident procedures in
place and routine
compliance sampling and
resampling as per
monitoring programme. 
Continued collaborative
working to ensure potable
water supplies and timely
response to water quality
failures. G
Promotion of safe practices and
procedures where there is contact
with livestock at animal parks and
farms 
Advice available on the
procedures to be adopted
where there is contact with
livestock at farms and animal
parks. Complaints were
investigated and action taken.
Advice available on the
procedures to be adopted
where there is contact
with livestock at farms
and animal parks.
Complaints were
investigated and action
taken.
-
G
Implement recommendations on
the safe use of agricultural ground
for recreational events. 
Safe use of agricultural ground
for recreational events is
implemented across Argyll and
Bute for all events including
agricultural shows, Highland
Games and other festival
events.
Recommendations
implemented.
-
G
Investigations of cases of STEC
and implementation of appropriate
control measures. 
All cases which are notified are
investigated by EH as routine
workload.   
All cases which are
notified are investigated
by EH as routine
workload.   
-
G
Food control Reinstate food control enforcement
services and deliver a range of food
interventions in respect of the
national Food Safety Code of
Practice. 
Inspection programme of food
businesses serving vulnerable
groups and programme of
random sample of food
businesses commenced.
Small team of officers focus on
Approved premises, to
encourage detailed knowledge
of high risk products.
Inspection programme in
place focussed on high
risk premises. 
-
G
Page 170

Page 171

Joint Health Protection Plan 25-27 v1.0                Page | 29 
Outcome Work plan Argyll & Bute Council
actions/comments
Highland Council
actions/comments
NHS Highland
actions/comments RAG Status
Working with FSS, develop a new
approach to food enforcement in
Scotland (SAFER) whilst ensuring
that food safety and public health is
protected.
Engagement with FSS but
national programme has been
delayed
Engagement with FSS but
national programme has
been delayed
-
A
Scottish Veterinary
Service review
• Participating in the national
program relating to the creation
of a Scottish Veterinary Service,
and the impact on local
authority animal health and
welfare services. 
Creation of Scottish SVS has
been put on hold pending
identification of any funding
streams, meaning the
formation id currently unlikely.
- -
G
• Managing the risk relating to the
possible transfer of AHW
services from local authorities
which will impact adversely on
other statutory services relating
to environmental health and
trading standards.
The Local Authority SVS
Steering Group developed an
AHW Improvement Plan which
was delivered through the
Animal Health and Welfare
Strategy Group.  
G
Monitoring and
Improving drinking
water quality
Collaboration between all three
agencies and Scottish Water in the
monitoring and improvement of
public water supplies. 
Continued collaborative
working to ensure potable
water supplies and timely
response to water quality
failures.
Continued collaborative
working to ensure potable
water supplies and timely
response to water quality
failures.
Continued collaborative
working to ensure potable
water supplies and timely
response to water quality
failures.
G
Page 171

Page 172

Joint Health Protection Plan 25-27 v1.0                Page | 30 
Outcome Work plan Argyll & Bute Council
actions/comments
Highland Council
actions/comments
NHS Highland
actions/comments RAG Status
Work with DWQR to deliver the
requirements on Private Water
Supplies. 
Private water supply grant
scheme in place and being
delivered in Argyll and Bute.
Since its inception, £2.27
million has been provided to
improve private water supplies.
Participation in the working
group for the new lead in water
guidance (“Public health
management of elevated lead
levels in drinking water
guidance”) with SHPN
Water scarcity plan and
actions – Council participation
in Scottish Government
Scarcity Scheme in 2023,
2024 and 2025. Water
provided to seven supplies in
2025 during the May dry
period. 
1277 commercial supplies
sampled as required from the
monitoring programme. 162
investigations undertaken
following initial “failure” of
supplies. 
Private water supply
Improvement Grants for
supplies: 16 grant applications
paid in the period, issuing
£29,029.05 in funds for these
works.   
Works are going to extend
grant availability for
determined criteria of lead in
Programme of sampling
and risk assessment in
place and underway.
Highland has 1209
commercial supplies and
1676 domestic supplies. 
Environmental Health
continue to support the
Scottish Government
water Scarcity Scheme
and seeing an increase in
demand for emergency
bottled water in specific
geographical areas. 
796 commercial supplies
and 76 domestic supplies
sampled. 155
investigations undertaken
following initial failure of
supplies. 
35 grants for private water
supply improvements
were approved with an
expenditure of £42,842.90 
Highland Council's private
water supply grant policy
was reviewed in 2023 and
enhanced grant funding is
available to eligible
persons for carrying out
improvements to their
supplies, including the
removal of lead and
increasing supply
Continued collaborative
working to ensure potable
water supplies and timely
response to water quality
failures.
G
Page 172

Page 173

Joint Health Protection Plan 25-27 v1.0                Page | 31 
Outcome Work plan Argyll & Bute Council
actions/comments
Highland Council
actions/comments
NHS Highland
actions/comments RAG Status
water, increasing supply
resilience and supplies
requiring additional “complex”
chemistry treatment to be
installed. This would enable
additional monies to be issued
for private water supply users.
Proposals in draft for this.   
148 Private Water Supply Risk
assessments completed. 
resilience. Two enhanced
grants have been
awarded for resilience
improvements. 
556 private water supply
risk assessments of
commercial supplies have
not been completed. This
accounts for 46% of the
commercial supply
register. Resources
continue to be focused on
the risk assessment
programme 
Control
Environmental
exposures which
have an adverse
impact on health
Tackle the effects of antisocial or
excessive noise in the community. 
Work ongoing at operational
level across all areas 
Work ongoing at
operational level across
all areas  G
Deliver on air quality standards
within each local authority area. 
Local Air Quality in Argyll and
Bute is good and well below
national standards for all the
prescribed pollutants.
Regular Air Quality report
submitted and approved
by Scottish Government. 
Following review and
noted improvement in air
quality in Inverness City
Centre, the Air Quality
management Area was
revoked in May 2025.
Continued collaborative
working to support effective
responses to poor air
quality. 
G
Review approaches to swimming
pools and spas to ensure
appropriate controls are in place
regarding infection control. 
Assessed during inspections
and other investigations
Assessed during
inspections and other
investigations
- 
A
Blue-green algae - Promotion of
safe usage of recreational waters
where there is a risk of BGA,
implementation of permanent
Blue-green algae – Officers
have assessed waters and
identified where to erect
permanent signage advising of
Specific risk assessments
completed. Permanent
signage being reviewed. 
Timely response to
incidents involving blue-
green algae. G
Page 173

Page 174

Joint Health Protection Plan 25-27 v1.0                Page | 32 
Outcome Work plan Argyll & Bute Council
actions/comments
Highland Council
actions/comments
NHS Highland
actions/comments RAG Status
signage and responding to
incidents that occur. 
the risks and measures to take
where algae growth is noted.
Specific risk assessments
completed
Progress Contaminated Land
strategies and ensure land is made
suitable for use through
development management. 
New charging regime being
piloted for site investigation
reports (historic industrial
uses) 
Lead levels in public buildings-
reactive approach in place 
Ongoing work through
development control
process
-
G
Monitoring of bathing water quality
(designated beaches/lochs) with
SEPA. 
Liaison with SEPA and action
as appropriate
Work ongoing at
operational level across
all areas
-
G
Apply the regulations for legionella
safety in public buildings. 
Mainstreamed into Health and
safety regulation
Mainstreamed into Health
and safety regulation
-
G
Monitor the levels of lead in
drinking water in public buildings
especially schools and in relevant
private establishments such as
nurseries.
Designated officers receive the
Scottish Water “Initial Drinking
Water Quality Notification
Report for Event” emails and
subsequent follow up to these
with progress made. Contact
can be made to Environmental
Health service with established
email channel, as with incident
in October 2024, requiring
Environmental Health to
investigate. 
Team are participating
and undertaking relevant
work
-
G
Control Environmental exposures
which have an adverse impact on
health
Incidents - Participation in oil
spill event whereby major oil
pipeline leaked into local area
served by private water
supplies, with remediation
work monitoring and PWS
Procedures in place for
significant incidents
-
G
Page 174

Page 175

Joint Health Protection Plan 25-27 v1.0                Page | 33 
Outcome Work plan Argyll & Bute Council
actions/comments
Highland Council
actions/comments
NHS Highland
actions/comments RAG Status
requiring protection throughout
period – now resolved. 
Reacted to a number of boat
sinking/abandonment issues
requiring action to prevent
public exposure and/or food
chain exposure
Resilience to
respond to
pandemics through
effective multi-
agency response
• Review business continuity
plans and Pandemic plans in
light of the learning from the
COVID-19 pandemic
Business continuity plans have
been updated along with
teams and departments across
the organisation.
Business continuity plans
have been updated along
with teams and
departments across the
organisation.
Business continuity plans
have been updated along
with teams and
departments across the
organisation. 
G
Effective sea and
airport health plans
to provide adequate
disease control
measures
Review existing sea and airport
health plans across Argyll and Bute
Council and Highland Council to
include arrangements for any
imported disease e.g. Viral
Haemorrhagic Fever 
Outstanding and to be
included for action in 2025-27
plans
Outstanding and to be
included for action in
2025-27 plans
-
A
Hold a desktop exercise to test
these plans. 
Outstanding and to be
included for action in 2025-27
plans 
Outstanding and to be
included for action in
2025-27 plans 
Contribution to the national
cruise ship exercise along
with national and local
agencies plus cruise ship
operators.
A
Review the current situation
concerning Port Health and identify
whether Argyll and Bute should
become a designated Port Health
Authority.
Outstanding and to be
included for action in 2025-27
plans 
- -
A
Enhance recovery
planning for a major
incident
Review and further develop the
generic Recovery Plan outlining
multi-agency responses. 
Radiation incident exercised at
HMNB Clyde as per cyclical
requirements
Exercises held covering
recovery including
radiation incidents
-
G
Exercise recovery plan for major
flood or events.
Desktop exercise (“Hawaii of
The North”) for the Tiree Music
Festival successfully held in
Oban in March 2025. Exercise
Environmental Health
regularly involved in
Safety Advisory Group
meetings to ensure a
-
G
Page 175

Page 176

Joint Health Protection Plan 25-27 v1.0                Page | 34 
Outcome Work plan Argyll & Bute Council
actions/comments
Highland Council
actions/comments
NHS Highland
actions/comments RAG Status
was designed and co-
ordinated by Environmental
Health and the Tiree Music
Festival to test the event safety
plans, emergency plans and
the contingency and capacities
of those in attendance to
respond to emergency
incidents. 
The Environmental Health
service organise regular Safety
Advisory Group meetings to
ensure a multi-agency input to
safety consideration of public
events. 
multi-agency input to
safety consideration of
public events. 
Contribute to Regional Resilience
Partnerships. 
Council responded to a
number of incidents which
required the implementation of
the incident response and
recovery. This included
landslides where communities
were isolated, road closures,
storms (Storm Eowyn etc) and
power outages.
Ongoing contributions to
the RRPs 
Ongoing contributions to
the RRPs across all three
agencies.
G
Continue implementation of Care
for People guidance 
Guidance followed as part of
major event preparations
Guidance followed as part
of major event
preparations
Guidance followed as part
of major event preparations G
Specific training in respect of
Scientific and Technical Advisory
Committees (STAC) to NHS and LA
staff
Specific STAC training
provided to appropriate
agencies as part of
preparations for exercising the
Offsite Plan for Faslane 
STAC training has been
held through UKHSA.
G
Page 176

Page 177

Joint Health Protection Plan 25-27 v1.0                Page | 35 
Outcome Work plan Argyll & Bute Council
actions/comments
Highland Council
actions/comments
NHS Highland
actions/comments RAG Status
Effective and
proportionate
arrangements in
place to protect
public health
Revise joint health protection
policies and procedures between all
three parties. 
EH operational work ongoing
and demand reduction
exercises ongoing to ensure
the effective use of resources. 
Routine procedures in
place but need for review
Routine procedures in
place but need for review
A
Review existing
arrangements/plans as a routine
part of each incident that occurs.
Briefing and implementation of
learning is a standard part of
incident management.
Briefing and
implementation of
learning is a standard part
of incident management.
Briefing and
implementation of learning
is a standard part of
incident management. 
Undertake specific exercises for the
purposes of training and evaluation
of contingency plans relating to
water and waste-water incidents
and the recovery phase following a
radionuclide incident.
Radionuclide incidents
exercised but exercises for
water and waste-water
incidents not undertaken
Radionuclide incidents
exercised but exercises
for water and waste-water
incidents not undertaken
It was not possible to
deliver the exercise within
the time-frames of the plan
but there is an exercise
being planned in relation to
water and waste-water
incidents.
A
Consider key performance
standards for the response,
investigation and actions for public
health incidents
Key performance standards for
the response, investigation
and actions for public health
incidents not progressed 
Key performance
standards for the
response, investigation
and actions for public
health incidents not
progressed 
Key performance standards
for the response,
investigation and actions
for public health incidents
not progressed 
R
Joint training in managing
incidents/outbreaks and chairing
these meetings such as STAC. 
Joint STAC Training provided
by NHS Highland
Joint STAC Training
provided by NHS
Highland
Joint STAC Training
provided by NHS Highland
G
To investigate and take appropriate
action in response to service
requests which have the potential
to impact adversely on the
environment or to public health
Response to service requests
requiring investigation by
Officers. Officers authorised to
act and undertake
interventions as and when
required.   
Response to service
requests requiring
investigation by officers,
with resources focussed
on cases with significant
public health risks
-
G
Page 177

Page 178

Joint Health Protection Plan 25-27 v1.0                Page | 36 
Outcome Work plan Argyll & Bute Council
actions/comments
Highland Council
actions/comments
NHS Highland
actions/comments RAG Status
Joint protocol to be devised to
manage vulnerable individuals
displaying hoarding behaviour or
whose lifestyle behaviour affects
others.
Hoarding cases investigated
following guidance but Joint
protocol not progressed
Hoarding cases
investigated following
guidance but Joint
protocol not progressed
Joint protocol not
progressed
A
Minimise the risk to
the public from Lyme
Disease
Assist with ongoing research and
reviews. Continue to raise public
awareness. Review and develop
websites/links to provide suitable
information.
Information on Ticks and Lyme
disease promoted.
Information on Ticks and
Lyme disease promoted. 
G
Reducing the impact
of tobacco, alcohol
and other harmful
substances on public
health
Continued regulation of the
smoking ban in enclosed and public
places including NHS premises. 
Ongoing arrangements in
place with NHS for them to
manage their premises - no
proactive enforcement from
Council regarding smoking on
NHS premises 
Smoke free premises –
workplaces and public areas.
Six complaints investigated
relating specifically to cigarette
smoking, either inside a
workplace, outside a
workplace or at premises
entrance to premises e.g.
doorway.  
Ongoing arrangements in
place with NHS for them
to manage their premises
-
G
Continued work with licensed trade
in respect of responsible drinking
and minimum pricing.
Part of the annual programme
of inspections throughout the
area completed Licencing
Standards. This is completed
either virtually, through a self-
assessment or a physical visit.
During this, premises are
educated, encouraged and
inspected to ensure
compliance with the mentioned
responsible drinking and
minimum pricing requirements.
Part of the annual
programme of inspections
throughout the area is
completed by Licencing
Standards. 
-
G
Page 178

Page 179

Joint Health Protection Plan 25-27 v1.0                Page | 37 
Outcome Work plan Argyll & Bute Council
actions/comments
Highland Council
actions/comments
NHS Highland
actions/comments RAG Status 
Continue regulatory work on age-
related sales activity of cigarettes
and other products. Promotional
campaign targeted at reducing the
under-age sale of tobacco and
vaping products to children and
young adults.
Trading Standards participate
in the Enhanced Tobacco
Sales Enforcement
Programme (ETSP). This
involves taking test purchases
of tobacco and NVPs (vapes)
in 10% of registered premises
in Argyll and Bute. Make
advice visits to 20% of
registered premises in Argyll
and Bute. TS active in under-
age sales work and new single
vape legislation 
TS active in under-age
sales work and new single
vape legislation  and
committed to meeting all
targets in the ETSEP
programme 
-
G
Joint working with the police
relating to the sale of Novel
Psychoactive Substances (NPS). 
NPS enforcement is a Police
matter – regulation changes
more enforced by Police
Scotland.  
- -
G
Continue to review and consider
possible health issues related to e-
cigarettes.   
G
Strong and Safe
Communities
To investigate and implement
effective controls to minimise the
spread of suspected and confirmed
cases of communicable and
notifiable diseases in the
community. 
332 recorded ‘infectious
diseases’ notifications, each
investigated and assessed by
Environmental Health staff,
with the relevant interventions
then taken. 
Cases investigated and
assessed by
Environmental Health
team, with the relevant
interventions then taken. 
Enhanced performance
management in place with
respect to the monitoring of
key performance indicators
relating to the management
of cases of notifiable
infections.
G
The protection of the vulnerable in
communities from the impact of
cold calling and rogue traders.
Argyll and Bute Council
webpage “Council issues
rogue traders warning” issued
in April 2024 following “reports
of rogue traders operating in
Trading Standards active
campaigns on rogue
traders and scammers. 
-
G
Page 179

Page 180

Joint Health Protection Plan 25-27 v1.0                Page | 38 
Outcome Work plan Argyll & Bute Council
actions/comments
Highland Council
actions/comments
NHS Highland
actions/comments RAG Status
and around Oban and
Dalmally”.  
Use of Trading Standards
Facebook page for spreading
the word about local issues or
concerns which have been
raised to the service.  
Install “TrueCall” blockers in
vulnerable persons
properties.   
Provide stickers which can be
located on the front window /
door to dissuade visitors / cold
callers.  
Radon protection Ensure that the public in radon
affected areas are provided with
adequate information relating to the
risks of radon and the mitigation
measures which can be taken to
reduce the risk
Use of third-party monitoring
by public encouraged where
enquiries made
Advice available to public
on radon risks
-
G
Raising awareness of radon
monitoring responsibilities to
employers and landlords.
PWS assessed and where
appropriate monitored with
respect of Radon in drinking
water
PWS assessed and
where appropriate
monitored with respect of
Radon in drinking water
-
G
Produce a Radon Strategy for ABC
to include council owned property
and rented property. 
Radon strategy in place for
Council properties. 
Radon strategy in place
for Council properties. 
-
G
Ensure Radon awareness through
development management.
Radon mitigation practices
considered as part of Building
Warrant approval
Radon mitigation
practices considered as
part of Building Warrant
approval
-
G
Education and
advice programme
Raising awareness of the Outdoor
Code and communicable disease
and controls through improved
public information.
Argyll and Bute Council
webpage “Ticks and Lyme
Disease”. webpage ‘Outdoor
access rights and
responsibilities’ to provide
Advice available The website has been
updated to reflect current
circumstances. G
Page 180

Page 181

Joint Health Protection Plan 25-27 v1.0                Page | 39 
Outcome Work plan Argyll & Bute Council
actions/comments
Highland Council
actions/comments
NHS Highland
actions/comments RAG Status
information to residents and
visitors on how to “enjoy the
countryside responsibly”.
Development and review of existing
information leaflets and
improvements to website.
Delivered through social media
and websites
Delivered through social
media and websites
Delivered through social
media and websites G
Where possible, consider and
coordinate seasonal promotions
and awareness raising campaigns
e.g. a summer campaign
highlighting the risks of ticks and
barbecues. 
Argyll and Bute Council
webpage provides guidance
notes for the public and
businesses in relation to the
control of Legionella and the
safe use of Spa Pools. Further
guidance covers the safe use
of Scandinavian hot tubs and
outdoor baths. Argyll & Bute
Council webpage also
provides Legionella risk
assessment template for
landlords and spa pool self-
assessment form. Argyll &
Bute Council guidance on
Non-Surgical Cosmetic
Procedures published August
2025. 
Limited work undertaken
using social media. 
The development of a
calendar of
communications has been
carried forward into the
next plan.
A
Increase awareness of health
protection issues with local
businesses through use of
alternative enforcement plans.
Major issues are addressed
through national campaigns
and specific local campaigns
(e.g slushies, blue-green
algae, etc) 
Major issues are
addressed through
national campaigns and
specific local campaigns
(e.g slushies, blue-green
algae, etc)
Major issues are addressed
through national campaigns
and specific local
campaigns (e.g slushies,
blue-green algae, etc)         
G
Investigation of suspected and
confirmed cases of communicable
disease and implementation of
All cases of ID reviewed and
investigated by EH staff with
follow up actions taken as
All cases of ID reviewed
and investigated by EH
staff with follow up actions
taken as required.
Timely investigation and
management of cases of
communicable disease. G
Page 181

Page 182

Joint Health Protection Plan 25-27 v1.0                Page | 40 
Outcome Work plan Argyll & Bute Council
actions/comments
Highland Council
actions/comments
NHS Highland
actions/comments RAG Status
appropriate controls to prevent
further spread. 
required. Monitoring of
performance in place.
Monitoring of performance
in place.
Monitoring trends by enhanced
surveillance and reporting. 
Use of Uniform ID module
enables monitoring of trends 
Case management
system Civica APP used
to monitor trends
Enhanced surveillance in
place with new
performance management
processes in place. 
G
Implement the national
microbiology strategy locally and
ensure appropriate access to
testing in the public analyst labs.
Actioned by Local Authority
analytical services
Actioned by Local
Authority analytical
services 
-
G
Ensure public health actions are
taken to minimise risks from
zoonotic infections reported by
Scottish Veterinary Service (SVS).
public health actions taken to
minimise risks from zoonotic
infections
public health actions
taken to minimise risks
from zoonotic infections
public health actions taken
to minimise risks from
zoonotic infections G
Food safety priorities To undertake the duties as
statutory Food Authority in
protecting food safety in the food
industry, and deliver the Councils’
Food Safety Law Enforcement
Work plan. 
Mainstreamed and targeted
based on available resource.
Priority given to approved
premises sector and higher
risk premises
Mainstreamed and
targeted based on
available resource.
Priority given to approved
premises sector and
higher risk premises
-
G
Work with other agencies to reduce
the impact of illegal shellfish
harvesting and distribution.
On-going liaison with FSS
Food Crime Unit 
On-going liaison with FSS
Food Crime Unit 
-
G
Health and safety at
work initiatives 
To complete the Councils’ Health
and Safety at Work Law
Enforcement Plan.
Planned work interruptions
ongoing due to 3 current
fatality investigations.   
Investigation findings inform
local priority initiatives for
care/nursing homes and for
swimming pools. Intelligence
Ongoing work in response
to accidents and fatalities. 
-
G
Page 182

Page 183

Joint Health Protection Plan 25-27 v1.0                Page | 41 
Outcome Work plan Argyll & Bute Council
actions/comments
Highland Council
actions/comments
NHS Highland
actions/comments RAG Status
and service requests also
determine potential health and
safety initiatives. 
Horizon Scanning
and Emerging
Infections
Be aware of new and emerging
infections and plan how to minimise
their impact locally e.g. Mpox
Liaised with NHS Highland  Liaised with NHS
Highland
Preparedness work
undertaken in relation to
mpox and HCID more
generally in addition to the
re-emergence of measles.
G
Minimise the adverse
impact of climate
change
Work together to mitigate the
effects of climate change. 
Water Scarcity support
arrangements in place for
domestic properties on private
water supplies
Reactive response to incidents
relating to weather, storms,
landslides. 
Water Scarcity support
arrangements in place for
domestic properties on
private water supplies 
Alert shared in relation to
the risk of vector-borne
diseases.
Reactive response to
incidents such as wildfires
along with partner
agencies.
G
Animal health and
zoonoses
Respond to current and emerging
diseases such as the risks from
avian influenza. 
Ongoing reactive response to
emergent infections such as
the increased incidence of
avian influenza seen in 2023.
Reviewed preparedness and
plans to respond to avian
influenza case(s)
Ongoing engagement with
poultry keepers through
Council website.
Promotion of Scottish Kept
Bird Register to enable direct
information provision as
appropriate. 
Ongoing reactive
response to emergent
infections such as the
increased incidence of
avian influenza
Ongoing reactive response
to emergent infections such
as the increased incidence
of avian influenza seen in
2023.
G
Deal with the illegal import of
animals. 
Any cases reported are
investigated 
Any cases reported are
investigated
-
G
Carry out animal health and welfare
enforcement activities in
accordance with Framework
Agreements.
Animal Health and Welfare
Framework document in place
and agreed by Council. Focus
of operational enforcement
Animal Health and
Welfare Framework
document in place and
agreed by Council
-
G
Page 183

Page 184

Joint Health Protection Plan 25-27 v1.0                Page | 42 
Outcome Work plan Argyll & Bute Council
actions/comments
Highland Council
actions/comments
NHS Highland
actions/comments RAG Status 
work on livestock markets and
high-risk premises, service
complaints and joint working
with Animal Health and Plant
Agency and other partners
Improve preparedness to deal with
animal health disease outbreaks.
Revised and implemented that
specific disease control plans
developed by the West of
Scotland Regional Residence
Groups
Team engages with local
and national animal
health forums
-
G
Workforce planning
and resilience
Training and support in incident
management and response
including STAC training.
STAC training undertaken
through UKHSA by new
officers to enhance resilience
across the service
STAC training undertaken STAC training undertaken
through UKHSA. G
Workforce planning and resilience Service redesign undertaken
and implemented. Resourcing
issues are being addressed
and new “career pathway”
posts created due to EHO
shortage across Scotland. 
Appointment of Trainee
Graduate Food Safety Officer.
Workforce planning
ongoing to encourage
career development.
Redesign underway in
2025  A
Water safety plans Develop water safety plans.  Delayed due to resourcing –
carry forward to 2025-27 plan
Delayed due to resourcing
– carry forward  A
Review of boat hirers
arrangements.
Delayed due to resourcing –
carry forward to 2025-27 plan 
Delayed due to resourcing
– carry forward  A
Coordinated
approach to public
health
Actively participate in the national
Scottish Health Protection Network
and associated governance groups
to promote a coordinated approach
to protecting public health and
developing new guidance and
systems.
Continued involvement in the
SHPN topic groups and
guidance development groups.
Participation in Investigation of
elevated levels of lead in
drinking water guidance, due
to be published October 2025
Senior EHOs actively
involved in national
groups
Continued involvement in
the SHPN topic groups and
guidance development
groups. G 
Page 184

Page 185

Joint Health Protection Plan 25-27 v1.0                Page | 43 
Page 185

Page 186

Joint Health Protection Plan 25-27 v1.0                Page | 44 
3.2 Review of Standard Operating Procedures, Protocols and Plans
NHS Highland and its two local authorities have numerous standard operating procedures
(SOPs) and policies. These concern a variety of health protection issues including food
safety. Each policy held by NHS Highland has a scheduled date of review. However, the
competing priorities posed by the pandemic has meant that these had not been updated
in accordance with planned timescales. This work continues to be prioritised as part of
the remobilisation of the HPT and both local authorities. It is recognised that the updates
to national guidance were also impacted by the pandemic and that local guidance will be
updated in accordance with national updates.  
The Environmental Health Liaison Group provides an opportunity for members to highlight
policies that may require revision in light of new evidence or legislation and to discuss
issues of common interest. This is being reconvened along with the national drinking
water meeting organised by Scottish Water.  A survey is planned to best understand the
needs of stakeholders and partner agencies to support development.
Page 186

Page 187

Joint Health Protection Plan 25-27 v1.0                Page | 45 
Section 4: Appendices
4.1 Appendix 1: List of joint NHS/Council Plans
There are an increasing number of national plans for managing the public health
management of infectious diseases and environmental hazards. 
Some key examples are:
• Management of Public Health Incidents: Guidance on the Roles and
Responsibilities of NHS led Incident Management Teams.
• Scottish Waterborne Hazard Plan
In addition to national plans sometimes there is a requirement to have, or added value
in having, a specific joint local plan. Some key examples are listed below:  
Title
1. Investigation of Enteric disease protocol
2. Protocol for failures following scheduled statutory sampling of Private Water
Supplies 
3. Protocol for failures involving lead in water supplies
4.
Blue-Green Algae (Cyanobacteria) in Inland and Inshore Waters:
Assessment and Minimisation of Risks to Public Health. Monitoring and
action plan for NHS Highland Board area.
5. Protocol for the investigation and management of viral outbreaks in the
tourist and leisure Industry
6. Protocol for the investigation and management of viral outbreaks in care
homes
7. Procedure for cases of illness in vessels arriving at ports/harbours in
Highland & Argyll & Bute
8. Procedure for cases of illness in aircraft arriving at Inverness airport 
Page 187

Page 188

Joint Health Protection Plan 25-27 v1.0                Page | 46 
4.2    Appendix 2: Designated Competent Persons under the Public Health
etc. (Scotland) Act 2008 
NHS Highland
Dr Jenny Wares Consultant in Public Health Medicine (Health Protection)
Dr Rob Henderson Consultant in Public Health Medicine
Dr Nicola Schinaia Consultant in Public Health Medicine
Dr Stephen
Bridgman
Consultant in Public Health Medicine
Ms Lynda Davidson Senior Health Protection Nurse
Ms Sandra Dekker Health Protection Nurse
Ms Phyllis Smith Health Protection Nurse 
Highland Council Environmental health
Lead Local
Authority competent
person: 
Alan Yates (Strategic Lead - Environmental Health &
Bereavement Services)
Depute Local
Authority competent
persons: 
Area EH Managers - Daniel Hopwood, Gregor MacCormick
Senior EHOs - Patricia Sheldon, John Murray, Barry Cumming
Competent persons Professional staff are authorised by the Strategic Lead -
Environmental Health & Bereavement Services according to
competency and experience. At the time of developing the plan,
those EHOs are:
Alana Steven, Philip Dent, Robert Murdoch, Zoe Skinner, Robin
Fraser, Michael Hayes, Eleanor Hood, Sharon Stitt, Beatrice
Aitken, Chris Ratter, Fiona Yates, Coila Hunter, Tanya Grosle,
Eliza Subotovic 
Argyll & Bute Council Environmental health
Lead Local Authority competent person:  Alan Morrison, Senior Manager- Regulatory
Services and Building Standards
Depute Local Authority competent
persons: 
Jacqui Middleton, Environmental Health
Manager (West)
Depute Local Authority competent
persons: 
Mary Watt, Environmental Health Manager
(East)
Depute Local Authority competent
persons: 
Mark Parry, Principal EHO (Public Health) 
Competent persons Professional staff are authorised by the
Senior Manager - Regulatory Services and
Building Standards Manager according to
competency and experience. At the time of
developing the plan, those EHO’s are:
Page 188

Page 189

Joint Health Protection Plan 25-27 v1.0                Page | 47 
Pamela Fraser, Cameron McAuley, Richard
Gorman, Anthony Carson, Martin MacNiven,
Nicole Hamilton, Jo Rains, Sue Stefek,
Pauline Varley, Conor Brolly, and Andy
MacLeod  
Page 189

Page 190

Joint Health Protection Plan (JHPP)   Page | 48 
4.3   Appendix 3: Supporting information
4.3.1 Health Protection 
Health protection is a specialist function within public health responsible for the
investigation and management of communicable diseases and environmental
hazards in order to protect population health. 
The health protection function is a key statutory responsibility for NHS Highland
Health Board and acts to:
• advise NHS Highland and its partners on health protection policies and
programmes;
• deliver services and supports the NHS and other agencies to protect
people from communicable diseases, poisons, chemical and radiological
hazards; 
• respond to new threats to public health; 
• and provide a rapid response to health protection incidents and outbreaks. 
NHS boards are accountable to the Scottish Government for protecting and
improving the health of people living within their geographic areas. The Public
Health (Scotland) Act 2008 provides clarity over the roles and responsibilities of
NHS boards and Local Authorities (LAs) and provides extensive powers to
protect public health. In general, NHS boards are responsible for people and LAs
are responsible for premises. NHS boards and LAs have a duty to co-operate in
exercising their functions under the Act, and to plan together to protect public
health in their area as detailed within this JHPP.
Environmental Health is the branch of Public Health that is concerned with all
aspects of the natural and built environment that may affect human health.  This
remit is delivered within local authorities. The Environmental Health Service has
a lead role in Health Protection through its regulatory core functions of Food
Safety, Health and Safety at Work, Communicable Disease control, Public and
Private Water Supplies, Monitoring bathing water quality, Contaminated Land, Air
Quality, Noise control, Nuisance abatement, Smoking Enforcement, and
prevention and control of Zoonotic diseases. The Trading Standards Service
performs the Council’s Consumer protection function, which includes tobacco
controls; product and consumer safety; licensing of persons, explosive and
petroleum; feeding stuffs and fertilisers; age related sales and weights and
measures.  
Page 190

Page 191

Joint Health Protection Plan (JHPP)   Page | 49 
4.3.2. Overview of NHS Highland and its Local Authority partners
The NHS Highland board area, encompassing the two local authorities of
Highland Council and Argyll and Bute Council, encompasses a vast and diverse
area as detailed in the maps below. 
NHS Highland Area Map   
Argyll and Bute Council Area Map  Highland Council Area Map 
The resident population is estimated to be 324,980 according to the latest
population estimates.8 The population is ageing, this profile is increased by the
Page 191

Page 192

Joint Health Protection Plan (JHPP)   Page | 50 
large number of young people leaving to continue education or seek employment
in other urban settlements. The territorial area covers 32,560 km² which
represents approximately 42% of the Scottish land surface. It extends across the
most northerly and westerly fringes of the Scottish mainland and includes 36
inhabited islands. A large proportion of the population lives in remote rural towns
and settlements. Transport infrastructure across much of the Highlands and
Argyll and Bute consists of single road or rail networks. Island communities are
reliant on ferries with few inter island connections. 
A large number of tourists visit the area throughout the year pursuing a variety of
activities. This influx, particularly to remote and rural areas, increases demands
on both health and local authority services. In order to facilitate trade and
tourism, the area contains several air and sea ports providing local and
international connections.
4.3.3 Resources and Operational Arrangements for Health Protection
The human resources available for delivering health protection services are
outlined in the table below. As detailed earlier in the plan, there has been an
expansion as a result of the COVID-19 pandemic. 
Table 3: NHS Highland Health Protection Team
Job Title Role and Responsibility WTE
Director of Public Health Strategic and Operational Lead for Public Health
activities in NHS Highland.
1
Consultant in Public
Health Medicine (Health
Protection)
Provide leadership and strategic oversight for
health protection development and implementation
in NHS Highland. To co-ordinate the provision of
an effective service for the control of
communicable diseases and environmental health
hazards on a 24/7 basis.
1
Health Protection Nurse
Specialists
Coordinate, lead and deliver activities surrounding
the prevention, investigation and control of
communicable diseases. 
6.1
TB Liaison Nurse Coordinate the contact tracing for TB
cases/contacts
0.4
Public Health Surveillance
Officer
Responsible for disease surveillance records and
reports.
0.2
Administration and
secretarial support
Provision of administrative and secretarial support. 3
Page 192

Page 193

Joint Health Protection Plan (JHPP)   Page | 51 
Table 4: Argyll and Bute Council
Job Title Role and Responsibility WTE
Senior Manager-
Regulatory
Services and
Building Standard  
Strategic and operational management of
environmental health, animal health, short-term let and
building standards Delivery of effective health
protection interventions. Lead and support the
development of staff.  Effective management of
resources.  Council’s Head of Food Safety and Lead
competent Public Health Officer.
1
Environmental
Health Managers
Management and delivery of the environmental health
service within a geographical area of Argyll and Bute –
east and west regions
2
Principal
Environmental
Health Officer
(Food Control and
Service Support) 
Provide specialist food safety advice and expertise
within Argyll and Bute Council. Provides specific advice
and supports the development of protocols, service
plans and ensure that they are in line with current
legislation.
The inspection of high risk and EC approved food
premises.
1
Principal
Environmental
Health Officer
(Health and
Safety and
Service Support)
Provide specialist health and safety advice and
expertise within Argyll and Bute Council.  Provides
specific advice and supports the development of
protocols, service plans and ensure that they are in line
with current legislation.
1
Principal
Environmental
Health Officer
(Public Health
and Housing) 
Provide specialist public health advice and expertise
within Argyll and Bute Council. Provides specific advice
and supports the development of protocols, service
plans relating to private water supply regulation, private
landlord registration including houses of multiple
occupation and public health.
1
Environmental
Health Officers
Full range of environmental health duties including
public health, food safety, environmental protection and
health and safety.
9 (3
vacant) 
Environmental
Protection Officer
Carrying out the Council’s statutory duty to identify
contaminated land and local air quality. To deal with
historic contamination under the planning process and
by programmed inspection; to carry out risk
assessments in accordance with legislation, statutory
guidance and the Council’s published Strategy.
1
Page 193

Page 194

Joint Health Protection Plan (JHPP)   Page | 52 
Regulatory
Services Officers
(EH)
To undertake a specific range of environmental health
duties principally in food safety.
2  
Regulatory
Services Officers
(PWS)
To undertake specific duties relating to private water
supply risk assessment and PWS grants
4 (0.6
FTE
vacancy) 
Graduate Trainee
Food Safety
Officer
To support food safety enforcement activity and
undertake training/developmenet program to attain
Higher Certificate in Food Control
1
Technical
assistants/
Sampling Officers
To support the environmental health service and
undertake environmental sampling and monitoring
programmes.
5.2
Senior Animal
Health and
Welfare
To supervise the delivery of animal health and welfare
service.  To undertake programmed visits relating to
animal health and welfare and primary food production.
Investigate all cases of notifiable animal disease
including zoonotic diseases.
0.6
Animal Health
and Welfare
Officer
To undertake programmed visits relating to animal
health, welfare and primary food production. Investigate
all cases of notifiable animal disease including zoonotic
disease
0.8
Trainee Animal
Health and
Welfare Officer
Undertake work under supervision and complete
training program. Career development post from
Trainee to Authorised Officer to AHW Officer
0.6
Short-term let
Licensing lead
Delivery the operational work associated with the short-
term let licensing scheme      1
Short-term let
licensing team
Enforcement and administrative staff delivering STL
scheme      
6
Private landlord
registration team
Deliver private landlord registration scheme in Argyll
and Bute      
2
Civil
Contingencies
Manager
Ensuring Argyll & Bute Council is prepared for a major
incident.     
1
Civil
Contingencies
Officer
Ensuring Argyll & Bute Council is prepared for a major
incident. 1
Liquor Licensing
Officers
Focused on compliance, mediation and support relating
to Liquor Licensing (Scotland) Act 
2
Trading
Standards
Manager
Manage, co-ordinate, lead and support activities
surrounding Trading Standards.  Develop protocols,
service plans in line with current legislation.     
1
Page 194

Page 195

Joint Health Protection Plan (JHPP)   Page | 53 
Trading
Standards
Officers and
Regulatory
Services Officers
Carry out Trading Standards interventions in
accordance with current plans, protocols and legislation     
4    
Table 5: Highland Council
Job Title Role and Responsibility  FTE
Strategic Lead -
Environmental Health
& Bereavement
Services
Strategic and Operational Lead for Environmental
Health and Public Health activities in Highland
Council.
1
Area Environmental
Health Mangers
Strategic and Operational managers for
Environmental Health
2
Senior EHOs  Operational Lead in respective areas for
Environmental Health and Public Health
activities. 
8
Environmental Health
Officers
Carry out Environmental Health and Public
Health interventions and inspections in
accordance with current plans, protocols and
legislation.
17 (inc. 2
trainee
posts)
Environmental Health
Technical Officers
To undertake a specific range of environmental
health duties principally in food safety and Health
& Safety, pollution, licensing and housing.
20
Technical Assistants/
Sampling Officers
To support the environmental health service and
undertake water sampling and monitoring
programmes.
6
Assistant Community
Works Officer
To support the environmental health service and
undertake dog control, litter, fly-tipping, pest
control
8
Scientific Officer
(Contaminated Land)
Carrying out the Council’s statutory duty to
identify contaminated land.  
1.91
Information Technician
& system administrator
Maintenance of the Council’s contaminated land
information records & IT functions.  
2
Animal Health &
Welfare Officer
Carry out Council’s statutory duty in relation to
Animal Health and Welfare.  
3
Trading Standards
Manager
Strategic and Operational Lead for Trading
Standards. 
1
Trading Standards
Team Leader
Coordinate, lead and support activities
surrounding Trading Standards.
1
Page 195

Page 196

Joint Health Protection Plan (JHPP)   Page | 54 
Trading Standards
Officers, Assistant
Trading Standards
Officers, Senior
Enforcement Officers
& Enforcement
Officers
Carry out Trading Standards interventions in
accordance with current plans, protocols and
legislation.
12
Liquor Licensing
Standards Officers
Carry out work with the licensed trade in respect
of responsible drinking and minimum pricing.
2
4.3.4 Laboratory Services
Arrangements to access laboratory facilities vary across the two local authorities.
Argyll and Bute Coucnil have a Service Levels Agreement in place with Glasgow
Scientific Services for the provision of the analytical servuces (to UKAS
accreditation standards) together with the statutory appointments of Public
Analyst, Food and Agricultural Examiner. Highland use Edinburgh Public Analyst
and Scottish Water. The HPT utilise NHS clinical laboratories.
4.3.5 Emergency Planning and Service Continuity
Resilience within NHS Highland is led by the Resilience Team (Head of
Resilience and a Resilience Advisor). They provide specialist support and
expertise and maintain operational links with multi-agency partners. 
Governance for this function is through the NHS Highland Resilience Committee
and this group support the development of incident response and continuity plans
across the Board. 
Highland Council and NHS Highland are members of the North Regional
Resilience Partnership. Argyll & Bute Council and NHS Highland are members of
the West Regional Resilience Partnership. In addition, there is the Highland &
Islands Local Resilience Partnership and various locality groups as well. Argyll
and Bute has its own Local Resilience Group with partner agencies. 
4.3.6 Inter-organisational collaboration
An updated approach to the feedback on disease surveillance collected as part of
routine and statutory monitoring is being explored.  
Following the pandemic, meetings are held on a two-weekly basis between
environmental health and health protection to discuss shared issues. In addition,
the Environmental Health Liaison Group is being re-convened and will meet twice
Page 196

Page 197

Joint Health Protection Plan (JHPP)   Page | 55 
per year. This will provide an opportunity to share key issues for which wider
partnership working would be beneficial and to evaluate the management of
significant incidents. Lessons learnt can be shared and disseminated within each
partner agency.
Following a significant incident, debriefing is organised routinely for the involved
agencies. This provides an opportunity for those involved operationally and
strategically to evaluate the management of the incident and provides a forum for
critical reflection. A final incident report should be produced within six weeks of
the debrief.
Table 6: Inter-organisational collaboration
Meeting / Group Membership Frequency
Environmental Health
Liaison Group
NHSH, ABC, HC,
Scottish Water, SEPA,
Animal Health, SRUC,
FSA, PHS
6 monthly
Scottish Water Liaison
Group
Scottish Water, NHSH
ABC, HC, DWQR
6 monthly  
4.3.7 Mutual Aid
Due to the vast geography of NHS Highland, it has been necessary to develop
arrangements with NHS Greater Glasgow and Clyde in relation to the initial
response to major incidents occurring within Argyll and Bute.  In particular, there
are specific arrangements written into the HM Naval Base Clyde Off-Site
Contingency Plan which is designed to cover radiation emergencies at HM Naval
Base Clyde. While NHS Highland retains overall responsibility for the NHS
response, they would be assisted, particularly in the initial stages, by personnel
from NHS Greater Glasgow and Clyde (NHS GGC), with staff from both boards
being deployed to manage the incident from the Clyde Off-Site Centre. 
Additionally, depending on the extent and volume of casualties, designated
receiving hospitals would be nominated within NHS GGC for the reception of
casualties.
Across the North of Scotland Public Health Network all participating public health
departments have signed a mutual aid agreement which states that each Board
will assist any of the others which has pressures it cannot meet on its own e.g. a
large outbreak or incident. There is also an informal mutual local authority
support arrangement in place with neighbouring authorities.
4.3.8 Out-of-hours arrangements
NHS Highland
Page 197

Page 198

Joint Health Protection Plan (JHPP)   Page | 56 
A senior member of public health staff is available 24 hours a day 7 days a week.
Outside of office hours, this service is provided by public health consultants,
health protection nurses and public health specialists, as well as training grade
specialty registrars. The service can be accessed through the Raigmore hospital
switchboard on 01463 704000. Raigmore laboratory provides a microbiology
service out of hours. Urgent sample requests can be performed for some
diseases following discussion with the on call microbiology team. National
Reference laboratories will also perform analysis of urgent specimens following
discussion of their appropriateness. 
Highland Council
No on-call service is provided by the Environmental Health, however there are
out-of-hours arrangements in place to access the service in case of emergency. 
This can be accessed through the following number: 01349 886690.
Arrangements are in place to access public analyst or other appropriate
laboratory services out with normal hours.   
Argyll and Bute Council 
No on-call service is provided by the Council, however there are out-of-hours
arrangements in place to access the service in case of emergency. This can be
done through the Regulatory Services Manager or the Civil Contingencies
Manager through the following number: 01436 658988.  Similar arrangements
are in place to access laboratory services out with normal hours. 
4.3.9 Maintenance of Competencies for Health Protection Staff
NHS Highland
NHS Highland staff undergo an annual appraisal to ensure their knowledge and
skills remain up to date. The health protection team run regular update sessions
for on call colleagues out with the HPT. Staff are encouraged to identify their own
learning needs and attend external conferences and meetings as part of
continuing professional development (CPD) activities. Nursing staff meet the
requirements of the Knowledge and Skills Framework and the revalidation
requirements of The Code (NMC). 
Highland Council
Page 198

Page 199

Joint Health Protection Plan (JHPP)   Page | 57 
Highland Council has a corporate performance and development review process.
Managers review staff training at regular intervals and as part of the employee
review and development process. 
Argyll and Bute Council
Argyll and Bute Council has a corporate performance and development review
process with its entire staff. Appraisals are carried out on an annual basis.
Details of this are held centrally on a register which managers review at regular
intervals and as part of the employee appraisal process. The individual learning
needs of each member of staff can be identified and targeted through this
mechanism. Within Regulatory Services, professional and technical officers are
required to meet the continued development requirements in the Royal
Environmental Health Institute of Scotland’s CPD scheme. 
4.3.10 Public Feedback
NHS Highland
Information is provided to the public through the use of local media and the NHS
Highland website along with targeted written information where required. NHS
Highland Health Protection Team does not have any formal processes for
obtaining feedback from the public. 
Argyll and Bute Council
Customer and business surveys are regularly undertaken as part of the customer
engagement strategy. Whilst not specific to health protection, these surveys
provide useful information about the service provided and are used to inform
improvements and developments. Recent surveys have indicated that on
average 94% of customers are satisfied with the service provided to them. 
Highland Council
Information is provided to the public through the use of local media and the
Highland Council website along with written information where required.
Feedback surveys are available to the public. 
Page 199

Page 200

Joint Health Protection Plan (JHPP)   Page | 58 
Page 200

Page 201

Joint Health Protection Plan (JHPP)   Page | 59 
References 
1 Scottish Government. Guidance on Part 1 and Designation of Competent Persons
Regulations. Scottish Government, 2012.
2 UKHSA. Measles. UKHSA. Available from URL: https://ukhsa-
dashboard.data.gov.uk/vaccine-preventable-diseases/measles
3 Public Health Scotland. Measles – data and surveillance. PHS, 2025. Available from
URL: https://publichealthscotland.scot/population-health/health-protection/infectious-
diseases/measles/data-and-surveillance/disease-surveillance/
4 Public Health Scotland. Immunisation and vaccine-preventable diseases quarterly
report – January to March 2025 (Q1). PHS, 2025. Available from URL:
https://publichealthscotland.scot/publications/immunisation-and-vaccine-preventable-
diseases-quarterly-report/immunisation-and-vaccine-preventable-diseases-quarterly-
report-january-to-march-2025-q1/main-points/
5 Sniffer. Evidence for the third UK Climate Change Risk Assessment (CCRA3) –
Summary for Scotland. UK Climate Risk, 2021
6 DWQR. Private Water Supplies Drinking Water Quality in Scotland 2023. DWQR,
2024. Available from URL: https://dwqr.scot/media/xpxnhhxz/private-water-supply-
annual-report-2023.pdf
7 Scottish Government and COSLA. Public Health Priorities for Scotland. Scottish
Government, 2018. 
8 National Records of Scotland. Population estimates time series data. NRS. Available
from URL: https://www.nrscotland.gov.uk/publications/population-estimates-time-series-
data/ 
Page 201

Page 202

7 
Appendix II: Infogram illustrating the role of environmental health in public health 
Page 202

Page 203

1 
ARGYLL AND BUTE COUNCIL 
DEVELOPMENT AND ECONOMIC GROWTH 
PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE 
UPDATE ON RECENT TAYNUILT BESS APPEAL
_________________________________________________________________________  
OUR REFERENCE:  24/02083/PP  
DPEA REFERENCE: PPA-130-2094   
CASE DETAIL: Installation of an energy storage facility including battery
enclosures, transformers, substation, grid connection, infrastructure,
earthworks, vehicular access, landscaping and associated works 
SITE ADDRESS: Land to the immediate west of Taynuilt Substation, Taynuilt  
APPLICANT:  Downing Renewable Developments 
STATUS:   Appeal Allowed by decision dated 14 November 2025 
_______________________________________________________________________  
1. INTRODUCTION 
1.1 Members may recall that determination of this application was initially deferred at PPSL
to hold a pre-determination hearing before making a decision to approve or refuse the
proposals. Officers had recommended that the application should be approved subject
to conditions. Following this PPSL decision to hold a hearing, the applicant
subsequently lodged an appeal against non-determination in advance of the proposed
hearing date removing the determination of the application from the Planning Authority.
This is an unusual occurrence but is within the rights of the applicant to do so. 
1.2 This report summarises the decision made by the Reporter appointed by the DPEA 
2. RECOMMENDATION 
2.1 Members are asked to note the contents of the report. 
3. REPORTERS CONCLUSIONS (Paragraph Numbers taken from Appeal Decision) 
The following excerpts have been taken from the Reporter’s conclusions: 
Preliminary Matters (Please note these paragraphs are not numbered in the appeal decision)  
“Whilst there have been criticisms of this decision being taken out of the hands of the council,
the appellant has exercised a statutory right of appeal as the application had not been
determined by the council within prescribed timescales. 
I noted requests for a hearing to be held to allow the community to express its views on this
proposal. The purpose of a hearing would ordinarily be to explore contradictory or unclear
written evidence. In this case I am satisfied that I have sufficient information on all matters,
including those raised in representations from the local community together with my own
observations during my site inspection, to be able to determine this appeal without the need
for a hearing.” 
Page 203 Agenda Item 8

Page 204

2 
Principle of Development 
“3. NPF4 policy 11 ‘Energy’ provides overarching support in principle for all forms of
renewable, low-carbon and zero emissions technologies, and this explicitly extends to
battery energy storage as established by part a)(iii) of the policy. This in-principle support is
framed more widely by policy 1 ‘Tackling the climate and nature crises’, which requires
significant weight to be given to these matters in decision-making. 
5. It is also beyond the scope of this appeal to explore whether locations, other than
that proposed, may be more preferable for the development to be located. There is no
policy basis for such an approach, and I must assess the proposal on its own merits, rather
than undertake a comparative assessment of theoretical alternative sites. I have noted that
the appellant has provided a site selection report which sets out why, in its view, the appeal
site is preferable from an environmental and technical perspective. It is still the case that an
unsuitable site would not become appropriate simply because of an absence of a better
alternative in the area.” 
Landscape and Visual Effects 
“9. The site is well contained within the landscape, by virtue of rising land to the south,
and trees and vegetation along the southern verge of the A85. Despite the development’s
rather incongruous character in a rural setting, once beyond the immediate vicinity of the
proposed development its effect on landscape character would rapidly diminish. The very
limited wider visibility of the site, the fairly modest scale of the proposed development and
its proximity to the existing substation combine to limit its effect on the character of the
landscape in which it would be seen directly, or seen from indirectly. I am satisfied that the
development’s overall impact on landscape features and character would be negligible on
this basis. 
10. The visual effects of the development would similarly be highly localised. There
would be glimpsing and partial views of the development from the A85, which would be
seen in the context of the neighbouring substation. It would not interrupt any longer range
views available from the road. It would be sufficiently distant from Taynuilt to not have any
bearing on the setting of the village and the visual amenity this provides.” 
Noise/Residential Amenity 
“17. In my judgement, the greatest potential for the proposed development to have
adverse residential amenity effects would be as a result of noise. Noise is one of the
various considerations identified by NPF4 policy 11(e) and LDP policy 30. A revised noise
impact assessment (dated 31 March 2025) was submitted by the appellant to the council,
which predicts that the highest noise levels would be at the nearest noise-sensitive
receptors (which as identified above are Fairy Hill Croft and the consented dwelling on land
at croft 4) but this would not exceed the representative background sound level. 
18. The assessment inevitably applies a number of assumptions in making that
prediction. Given the appellant has not to date specified the precise equipment
manufacturers and models for example, it is conceivable that the noise emissions could differ,
but the assessment is intended to present a realistic worst case scenario. The
council’s environmental health officer has reviewed the assessment, and accepts its
findings, including that internal noise levels set by BS8233: 2014 would not be exceeded at
the nearest properties, whether windows are open or closed. I attach weight to this finding,
but nevertheless, I consider that in order to provide an adequate safeguard against noise
Page 204

Page 205

3 
disturbance occurring, a condition should be imposed (which I note the council has also
recommended) to require the development to not exceed the noise levels predicted in the
appellant’s revised noise impact assessment. Subject to this requirement, there is no
reason to conclude that noise would result in a loss of residential amenity at any property. 
19. In conclusion, I am satisfied that all existing and consented dwellings in the general
vicinity of the proposed development would not be subject to a significant loss of residential
amenity, with most properties being entirely unaffected. In this regard the proposal does not
give rise to any conflict with the relevant provisions of NPF4 policy 11 and LDP policy 30.” 
Fire Risk 
“21. It is not the role of the planning system to manage fire risk, and this is addressed by
other regulatory regimes. It is however capable of being a material consideration insofar as
where there might be spatial and land use implications for managing any residual risk. 
22. Whilst the possibility of a BES fire cannot be ruled out, it also cannot be described as
likely. In my view it is reasonable to assert from the policy support provided for BES by
NPF4 policy 11 (which is provided without any reference to locational principles relating to
fire risk) that there is no reason to anticipate or expect a fire to occur. There is nothing
before me which would distinguish a BES from many other less novel types of development
in terms of residual fire risk. 
23. There would be particular characteristics of a BES fire, should it occur, giving rise to
specific fire containment and suppression methods. This has led to the National Fire Chiefs
Council publishing best practice guidance for fire and rescue services, which also contains
design principles that have some limited relevance to the planning process. This proposed
development would provide two separate access points to the facility, together with a
perimeter road. The red line development boundary is drawn sufficiently widely to provide
flexibility over the final alignment of the access roads, so that at least one access could be
used in the event of a fire regardless of wind direction. A water tank is proposed, to provide
an immediate adequate on-site supply. Sufficient separation between the BES units and
proposed landscaping/vegetation screening could be ensured as part of a scheme to be
required by planning condition, thereby minimising any risk of a fire spreading.” 
“28. Concern has been raised that water used for fire suppression would contain
pollutants, with run-off potentially entering the River Awe. The proposal is accompanied by
a surface water drainage strategy which takes this into account and outlines how this risk
would be mitigated. Whilst it is incumbent on the appellant to manage the residual direct
and indirect risk of a fire including the potential for pollution, as already noted my
assessment must confine itself to the operational nature of the development and land use
implications of this. It is not relevant to a development management decision to have regard
to all possible impacts of a fire when the likelihood of such an event is low. 
29. All told, whilst I acknowledge the concerns expressed by some of the community
relating to the possibility of a battery fire, I am satisfied that, from a land use perspective,
this matter is not a constraint to development for the reasons outlined above. Detailed
matters of access, and buffers between battery units and vegetation can be secured by
condition, but the residual possibility of a fire occurring, or hypothetical broader implications
of such an incident, are not matters for the planning system to regulate. This is further
reinforced by SEPA’s position that it only provides site-specific advice on the implications of
accidents if it falls within the Control of Major Accident Hazard (COMAH) regulatory regime,
which BES developments do not. I do not consider many of the provisions of NPF4
policy 23 (‘Health and safety’) to be engaged, as a BES proposal is not ordinarily deemed to
involve hazardous substances, nor is it recognised as a major accident hazard. Part (b) of
Page 205

Page 206

4 
NPF4 policy 4 ‘Natural places’ has been satisfied by an appropriate assessment having
been carried out.” 
Biodiversity Net Gain 
“33. NPF4 policy 3 ‘Biodiversity’ includes criteria which apply to major development. The
findings of the ecological appraisal submitted by the appellant indicates that there would be
limited effects on protected species or their supporting habitats, and it recommends various
good practice measures to mitigate the residual effects. On the basis of this evidence I
consider that there would be limited scope for negative effects even without mitigation, so
subject to conditions to require the suggested measures to be implemented, I am satisfied
that the mitigation hierarchy has been followed. Part (iv) of the policy also requires
significant biodiversity enhancements to be provided, in addition to mitigation. The
ecological appraisal makes suggestions in this regard, and I consider there to be clear
potential to approach proposed planting for the purposes of screening the development in a
way that would also maximise its biodiversity benefits. The red line site boundary is
sufficiently extensive to enable on-site significant biodiversity enhancement, but this is a
matter which can appropriately be addressed by requiring a scheme to be submitted to and
agreed by the council. Subject to this, the proposal would accord with NPF4 policy 3 overall.” 
Overall Conclusions 
“36. There is explicit policy support in principle for the proposed development, and the
development plan is also instructive that significant weight is to be given both to the
contribution it would make to greenhouse gas emissions reduction targets (achieved here
by storing renewable energy until it is required) and the climate crisis more widely. 
37. I acknowledge that there are widely held concerns and objections to the proposal
from some of the local community, but these partly stem from safety concerns which extend
beyond the scope of my assessment. Based on my foregoing reasoning I find the adverse
effects of the development to be limited and highly localised. Some of these matters would
be required to be subject to conditions, as would other considerations such as the need for
archaeological investigations, and decommissioning plans. In the face of the policy
presumption in favour of development and having assessed the site-specific characteristics
and its suitability for the proposed development, I find there to be no conflict with the
development plan in terms of applicable thematic or locational considerations, against
which the in-principle support would need to be balanced.” 
“39. I therefore conclude, for the reasons set out above, that the proposed development
accords overall with the relevant provisions of the development plan and that there are no
material considerations which would still justify refusing to grant planning permission. I have
considered all the other matters raised insofar as these are capable of being material
considerations, but there are none which would lead me to alter my conclusions.” 
Full details of the case can be found at the following link: 
Scottish Government - DPEA - Case Details     
4.0 IMPLICATIONS 
Policy: None. 
Financial: None.   
Legal: None
Page 206

Page 207

5 
HR: None
Customer Service: None
Risk: None
Climate Change: None
Fairer Scotland Duty: None
Equalities: None
Consumer Duty: None
Island Communities: None
Children’s Rights and Wellbeing: None 
Author: David Moore   Date: 28.11.25 
Fergus Murray 
Head of Development and Economic Growth   
Page 207

Page 208

This page is intentionally left blank

Page 209

ARGYLL AND BUTE COUNCIL  PLANNING, PROTECTIVE SERVICES    
AND LICENSING COMMITTEE
DEVELOPMENT AND ECONOMIC GROWTH            17TH DECEMBER 2025 
Local Development Plan 3 – Evidence Report Stage Engagement 
1.0 EXECUTIVE SUMMARY 
1.1 The purpose of this report is to notify PPSL Committee of the first stage of
engagement for Local Development Plan 3 (LDP3), which Members may recall
is significantly changed due to changes in the planning legislation. 
1.2 The planning authority is required to prepare an Evidence Report to inform and
justify the content of the next Local Development Plan (LDP3).  The issues to
be covered by the Evidence Report are also determined by legislation and are
set out in the report. They are divided into 18 Topic Papers and cover a wide
range of issues including: Housing, Transport, Infrastructure, Biodiversity,
Economy, Flooding, and Play Space.   
1.3 The Evidence Report will be informed by the views of stakeholders including
key agencies, children and young people, and the general public, to ensure
collaborative and transparent evidence gathering. A variety of engagement
methods are being employed including the Place Standard Tool.  Over the
coming months, draft Topic Papers will be placed online for public comment
regarding their accuracy and sufficiency to develop LDP3. Once the
engagement process has been completed and the Evidence Report finalised,
this will be presented to Members at Full Council for approval prior to
submission to Scottish Ministers for a Gatecheck, which essentially will seek to
confirm that there is sufficient evidence presented to form the basis of
preparation of LDP3.. 
1.4 Recommendations
It is recommended that PPSL:
i) Note the contents of this report and the engagement process being
undertaken to inform the LDP3 Evidence Report.   
Page 209 Agenda Item 9

Page 210

ARGYLL AND BUTE COUNCIL  PLANNING, PROTECTIVE SERVICES    
AND LICENSING COMMITTEE
DEVELOPMENT AND ECONOMIC GROWTH            17TH DECEMBER 2025 
Local Development Plan 3 – Evidence Report Stage Engagement 
2.0 INTRODUCTION 
2.1 The planning authority is required to prepare an Evidence Report to inform and
justify the content of the next Local Development Plan (LDP3). This will be
collated around policy topics, and in addition to the 18 Topic Papers, will be
supplemented by additional work including a Play Sufficiency Assessment.
The Evidence Report is to be informed by the views of stakeholders including
key agencies, children and young people, and the general public, to ensure
collaborative and transparent evidence gathering. 
3.0 RECOMMENDATIONS 
3.1 Recommendations
It is recommended that PPSL:
i) Note the contents of this report and the engagement process being
undertaken to inform the LDP3 Evidence Report.   
4.0 DETAIL 
4.1 The planning authority is required to prepare an Evidence Report to inform and
justify the content of the next Local Development Plan (LDP3). 
4.2  Section 15 (5) of the Town and Country Planning (Scotland) Act 1997 (as
amended by the Planning (Scotland) Act 2019) (“the Act (as amended)”) sets
out the matters which must be taken into account through the Evidence report,
Page 210

Page 211

which will be collated around policy topics.  To comply with this, 18 Topic
Papers will be prepared and these are listed below:
1. Climate Change
2. Biodiversity, Woodland and Forestry, and Soils
3. Landscape, Rural Development, and Tourism
4. Historic Assets and Places
5. Vacant and Derelict Land
6. Energy (Renewables)
7. Transport
8. Local Living, and Design, Quality and Place
9. Housing
10. Infrastructure
11. Green and Blue Infrastructure
12. Play Space
13. Flood Risk and Water Management
14. Economy
15. Town Centres and Retail
16. Aquaculture
17. Minerals
18. Green Belt   
4.3  Additionally, under section 16(D) of the Act (as amended), the planning
authority must assess the sufficiency of play opportunities in its area for children
in preparing the evidence report. The Town and Country Planning (Play
Sufficiency Assessment) (Scotland) Regulations 2023 set out the form and
content that is required of a Play Sufficiency Assessment (PSA) as well as the
consultation requirements for this. 
4.4 Section 16(B) of the Act (as amended) requires that, in preparing the evidence
report the planning authority are to seek the views of, and have regard to any
views expressed by:
(a)  the key agencies,
(b)  children and young people, in particular school pupils, youth
councillors and youth parliament representatives,
(c)  such other persons as may be prescribed, and
(d)  the public at large 
4.5    Additionally, for the PSA, The Town and Country Planning (Play Sufficiency
Assessment) (Scotland) Regulations 2023 require that, in preparing the PSA,
the planning authority must consult: 
(a)  children, 
(b)  parents and carers,
(c)  community councils within the planning authority’s area
established under Part IV of the Local Government (Scotland) Act
1973(3), and such other community bodies or persons whom the
planning authority consider should be consulted, and 
(d)  the public 
Page 211

Page 212

4.6 Key agencies, as well as other relevant stakeholder groups, are being engaged
with prior to public engagement on each Topic Paper. Additionally, the Topic
Papers will be sent to the neighbouring planning authorities at the same time
as these are each made available for public engagement. 
4.7 In order to comply with section 16(B) of the Act (as amended), public
engagement will be undertaken by publishing each Topic Paper online for a
period of 6 weeks. A form will be made available for members of the public and
community groups to complete to provide their views on whether the evidence
is accurate and sufficient, to determine the implications for LDP3. It is
anticipated that the 18 Topic Papers will be split into around 3 batches, with
between 5 and 7 Topic Papers (and associated appendices) being online at
one time, with the first set going online in early 2026. 
4.8 Separately, to inform the Design, Quality and Place Topic paper, Place
Standard Tool engagement is being used (as recommended in the LDP
Guidance. This is a method that is suitable for children and adults alike, and
which has been used by the council previously. In addition to public online
engagement, Officers are working with schools to undertake targeted youth
engagement. 
4.9 In order to comply with section 16 (D) of the Act (as amended), as well as The
Town and Country Planning (Play Sufficiency Assessment) (Scotland)
Regulations 2023, two online surveys have been developed – one for children
and a separate one for parents / carers and the wider public. 
4.10 Following this engagement and subsequent finalisation of the Evidence Report,
this will be presented to Members at a full Council Committee before being
submitted to Scottish Ministers for Gatecheck, as required by Section 16 (B) (5)
and (6) of the Act (as amended).   
5.0 CONCLUSION 
5.1 Engagement in the preparation of LDP3 is a vital component in the Town and
Country Planning (Scotland) Act 1997 (as amended). The engagement
process outlined herein will ensure collaborative and transparent evidence
gathering to inform and justify the content of LDP3.   
6.0 IMPLICATIONS
6.1 Policy – Local Development Plan 3 will replace Local Development Plan 2
(adopted 28th February 2024) in due course.
Page 212

Page 213

6.2 Financial – The Evidence Report stage engagement is being undertaken in-
house with no cost pressure. The costs for Gatecheck and Examination are
outwith the Development Policy budget and are a cost pressure. Based on
previous experience of the existing system these are likely to be in the order
of £70-£100k. 30% of this cost would be anticipated in 2026/27 for the
Gatecheck.
6.3  Legal – there is a statutory duty to engage during the Evidence Report stage
of LDP preparation.
6.4  HR - None
6.5 Customer Service – This report sets out how customers can get involved in
the early stage of the LDP3 process. The formal consultation period will be
held following production of the Proposed Plan.
6.6 Risk - The preparation of LDP3 will run over 5 years and therefore there is an
uncertainty regarding resource levels. Further reduction in resource levels
would impact on delivery of LDP3 and could result in failure to meet legislative
requirements and Scottish Government performance targets.
6.7 Climate Change - LDP3 will provide an up-to-date position in terms of land
use development and climate change impacts against which to assess
planning applications. A Strategic Environmental Assessment (SEA) will be
carried out as part of the LDP3 process.
6.8  Fairer Scotland Duty - The engagement at Evidence Report stage (as well as
subsequent stages) is being handled to encourage engagement with all. An
Equalities Impact Assessment will be undertaken as part of the LDP3 process.
6.9 Equalities - protected characteristics. The engagement at Evidence Report
stage (as well as subsequent stages) is being handled to encourage
engagement with all. An Equalities Impact Assessment will be undertaken as
part of the LDP3 process.
6.10 Consumer Duty - The engagement at Evidence Report stage (as well as
subsequent stages) is being handled to encourage engagement with all. An
Equalities Impact Assessment will be undertaken as part of the LDP3 process.
6.11 Island Communities - The engagement at Evidence Report stage (as well as
subsequent stages) is being handled to encourage engagement with all. An
Equalities Impact Assessment will be undertaken as part of the LDP3 process.
6.12 Children’s Rights and Wellbeing - LDP Preparation Guidance requires that
Local Authorities make provision for inclusion of children and young people
within the preparation of LDPs. 
Kirsty Flanagan,
Executive Director with responsibility for Development and Economic Growth
Page 213

Page 214

Policy Lead: Councillor Gordon Blair 
28th November 2025                                                  
For further information contact: 
Kim de Buiteléir - kim.debuiteleir@argyll-bute.gov.uk 
APPENDICES
None  
Page 214