Democracy Spraffa

Printed minutes

Argyll and Bute Council · 17 December 2025
Back to Planning, Protective Services and Licensing Committee — 17 December 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING
COMMITTEE held BY MICROSOFT TEAMS on WEDNESDAY, 17 DECEMBER 2025 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Amanda Hampsey
Councillor Graham Hardie
Councillor Fiona Howard 
Councillor Andrew Kain
Councillor Paul Donald Kennedy
Councillor Dougie Philand
Councillor Peter Wallace 
Attending: Stuart McLean, Committee Manager
Peter Bain, Development Manager
Alan Morrison, Regulatory Services and Building Standards Manager
Stuart Ramsay, Area Team Leader
Sandra Davies, Major Applications Team Leader
Shelley Gould, Senior Planning Officer 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Gordon Blair, Jan Brown, Audrey
Forrest, Daniel Hampsey, Mark Irvine and Liz McCabe. 
2. DECLARATIONS OF INTEREST 
Councillor Dougie Philand declared a non-financial interest in planning application
reference 22/00680/PP as a member of his family owned a substantial building firm within
the local area.  He left the meeting and took no part in the consideration of this application
which was dealt with at item 4 of this Minute. 
3. MINUTE 
The Minute of the Planning, Protective Services and Licensing Committee held on 18
November 2025 was approved as a correct record. 
Having declared an interest in the following item, Councillor Dougie Philand left the
meeting at this point. 
4. MACLEOD CONSTRUCTION LTD: ERECTION OF 8 DWELLINGHOUSES
AND FORMATION OF VEHICULAR ACCESS: LAND EAST OF KNOCK
FARMHOUSE, UPPER LOCHGAIR (REF: 22/00680/PP) 
The Area Team Leader spoke to the terms of the report.  This application is for planning
permission for a residential development on a site allocated for housing within the adopted
Argyll and Bute Local Development Plan (2024).  The principle of residential development
has therefore been established by the site’s allocation (ref: H3029). 
At the time of writing the report, public representations have been received from 41
respondents with 35 objecting to the scheme and 6 raising concern.  There have been no
objections from statutory consultees subject to planning conditions. 
It is the opinion of the Planning Authority that the representations received, together with
the Officer assessment of the relevant planning issues, provided all the information
required to enable Members to make an informed decision based on the material

Page 2

considerations in this case.  It is therefore not considered that the objections raise any
complex or technical issues that have not been addressed in the report of handling, and it
is not considered that a discretionary hearing would add value to the planning process. 
The proposal accords with the policy provisions of the adopted National Planning
Framework 4 and Local Development Plan 2 and it was recommended that planning
permission be granted subject to the conditions and reasons detailed in the report of
handling. 
Motion 
To agree to grant planning permission subject to the conditions and reasons detailed in
the report of handling. 
Moved by Councillor Kieron Green, seconded by Councillor Peter Wallace. 
Amendment 
To agree to hold a pre-determination hearing. 
Moved by Councillor Paul Kennedy, seconded by Councillor Graham Hardie. 
A vote was taken by calling the roll. 
Motion   Amendment 
Councillor Armour  Councillor A Hampsey
Councillor Green  Councillor Hardie
Councillor Howard  Councillor Kain
Councillor Wallace  Councillor Kennedy 
On there being an equality of votes, the Chair made his casting vote in favour of the
Motion. 
The Motion was carried by 5 votes to 4 and the Committee resolved according. 
Decision 
The Committee agreed to grant planning permission subject to the following conditions
and reasons: 
Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 31/03/2022, supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is

Page 3

obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan 4724/101  01/04/2022
Site Plan 4724/102 J 18/07/2025
Longitudinal
Section along
A83 showing
visibility heights
4724/117 D 15/07/2025
Proposed Floor
Plans Plot 1
4724/103  01/04/2022
Proposed
Elevations Plot 1
4724/104  01/04/2022
Proposed Floor
Plans Plot 2
4724/105  01/04/2022
Proposed
Elevations Plot 2 
4724/106  01/04/2022
Proposed Floor
Plans Plot 3
4724/107  01/04/2022
Proposed
Elevations Plot 3
4724/108  01/04/2022
Proposed Floor
Plans Plot 4
4724/109  01/04/2022
Proposed
Elevations Plot 4
4724/110  01/04/2022
Proposed Floor
Plans Plot 5 and
7
4724/111  01/04/2022
Proposed
Elevations Plot 5
and 7
4724/112  01/04/2022
Proposed Floor
Plans Plot 6 and
8
4724/113  01/04/2022
Proposed
Elevations Plot 6
and 8
4724/114  01/04/2022
Fence/Heat
pump details
4724/115  01/04/2022 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. PP – Affordable housing with Commuted Sum option 
Notwithstanding the effect of Condition 1, no development shall commence until a
scheme for the provision of affordable housing (as defined below) has been submitted
to and approved in writing by the Planning Authority. The scheme shall: 
a) Provide that a minimum of 25% of the approved dwellings are affordable homes;
b) Define those properties to be used as affordable homes;

Page 4

c) Establish the timing of their provision relative to the phasing of the development,
which shall ensure that the last 25% of the dwellings within the development are
not commenced until the affordable housing phase has bene completed for
occupation;
d) Establish the arrangements to ensure the affordability of the affordable homes for
both initial and subsequent occupiers (including any discount rate applicable in
terms of (ii) below); OR
e) Alternatively, shall provide for an equivalent Commuted Sum Payment to the
Council’s Strategic Housing Fund having regards to the report ‘Valuation of
Commuted Sum Payments’ approved by Argyll and Bute Council on 27th June
2013. 
For the purposes of this condition ‘affordable homes’ are defined as being either: 
i) Social housing (rented or shared ownership or shared equity) managed by a
registered social landlord (a body registered under part 3 chapter 1 of the Housing
(Scotland) Act 2001, or any equivalent provision in the event of the revocation and
re-enactment thereof, with or without modification);
ii) Discounted low cost sale housing (subject to a burden under the Title Conditions
(Scotland) Act 2003), or any equivalent provision in the event of the revocation and
re-enactment thereof, with or without modification).
iii) Housing for sale or rent without subsidy, which is designed to be affordable and to
meet the housing needs of the majority of those households identified as in housing
need in the Local Housing Strategy or Housing Market Study i.e. one or two person
households on average income, with conditions attached to their missives to
prevent further extension, thereby helping to ensure that they are likely to remain
affordable to subsequent purchasers. 
The development shall be implemented and occupied thereafter in accordance with the
duly approved scheme for affordable housing. 
Reason: To accord with the provisions of the development plan in respect of affordable
housing provision. 
3. PP – Landscaping 
No development shall commence until a finalised scheme of boundary treatment;
surface treatment and landscaping has been submitted to and approved by the
Planning Authority. The scheme shall comprise a planting plan and schedule which
shall include details of: 
i) Existing and proposed ground levels in relation to an identified fixed datum;
ii) Existing landscaping features and vegetation to be retained;
iii) Location design and materials or proposed walls, fences and gates;
iv) Proposed soft and hard landscaping works including the location, species, and size
of every tree/ shrub to be planted;
v) A programme for the timing, method of implementation, completion and subsequent
ongoing maintenance for all planting
vi) A biodiversity statement demonstrating how the proposal will contribute to the
conservation/ restoration/ enhancement of biodiversity, and how these benefits
will be maintained for the lifetime of the development.

Page 5

The development shall not be occupied until such times as the boundary treatment,
surface treatment and any re-contouring works have been completed in accordance
with the duly approved scheme. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme during the first planting season following the commencement of the
development, unless otherwise agreed in writing by the Planning Authority. 
Any trees/shrubs which within a period of five years from the completion of the
approved landscaping scheme fail to become established, die, become seriously
diseased, or are removed or damaged shall be replaced in the following planting
season with equivalent numbers, sizes and species as those originally required to be
planted unless otherwise approved in writing by the Planning Authority.
The Biodiversity Statement should refer to Developing with Nature Guidance,
NatureScot as appropriate. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity, and to comply with the requirements of NPF4 Policy 3. 
4. PP – Footpath link 
No development or site clearance works shall commence, for the development hereby
permitted, until detailed planning permission has been granted for the footpath link
outwith the red line boundary as indicated on the approved Site Plan drawing number
“4724/102 Revision J”. 
Reason: to ensure that facilities are provided for the pedestrians that are generated by
the development and that they may access the existing footpath system without
interfering with the safety and free flow of traffic on the A83 trunk road. 
5. PP – Junction with Public Road 
Prior to the commencement of the development, the proposed access on the A83 trunk
road, as generally illustrated by the approved site plan, drawing number “4724/102
Revision J”, shall be constructed to a layout and type (and method) of construction to
be approved by the Planning Authority, in consultation with Transport Scotland.
Reason: To ensure that the standard of access layout complies with the current
standards and that the safety of the traffic on the trunk road is not diminished. 
6. PP – Trunk Road Drainage system 
There shall be no drainage connections to the trunk road drainage system.
Reason: to ensure that the efficiency of the existing drainage network is not affected. 
7. PP – Internal layout access 
Notwithstanding the provisions of Condition 1, the proposed accesses to the new
adoptable standard development road shall be formed in accordance with the
Council’s Roads Standard Details; and visibility splays of 25 metres to point X by 2.4
metres to point Y from the centre line of the proposed access. The access shall be
surfaced with a bound material in accordance with the stated Standard Detail Drawing.
Prior to work starting on site the access hereby approved shall be formed to at least

Page 6

base course standard and the visibility splays shall be cleared of all obstructions such
that nothing shall disrupt visibility from a point 1.05 metres above the access at point X
to a point 0.6 metres above the public road carriageway at point Y. A dropped kerb
crossing point shall be provided at each access with the access surfaced for a distance
of 5 metres from back of footway. The final wearing surface on the access shall be
completed prior to the development first being brought into use and the visibility splays
shall be maintained clear of all obstructions thereafter. 
Reason: In the interests of road safety. 
8. PP – Construction Hours 
Notwithstanding the provisions of Condition 1, the construction of the development
hereby permitted shall be restricted to the specified hours of 0800-1800 hours Monday
to Friday, 0800 – 1300 hours Saturday and not at all on Sunday, Bank or Scottish
Public Holidays unless otherwise agreed in writing by the Planning Authority. 
Reason: To minimise the impact of noise, generated by construction activities on
occupiers of residential properties. 
9. PP – Parking and Turning
The provision of parking and turning for the development hereby permitted, shall
accord with the requirements of Policy 40 and Table 5 of the Argyll and Bute Local
Development Plan 2 2024. 
Reason: To ensure an adequate number of vehicle parking spaces to meet
development needs. 
10. PP- Finished Floor levels 
Notwithstanding the provisions of Condition 1, the finished ground floor levels of the
dwellings, hereby permitted, shall be at least 0.3m above surrounding ground level,
unless otherwise agreed in writing by the Planning Authority.
Reason: In order to ensure appropriate mitigation for flood risk and to ensure an
acceptable relationship between the development and its surroundings.
11. PP – Runoff Rate 
The post development runoff rate should be attenuated to the greenfield runoff rate
before discharge from site. Any drainage at the site should be designed in accordance
with CIRIA C753. 
Reason: In the interests of flood risk prevention. 
12. PP – Programme of Archaeological Works 
No development shall take place within the development site, as outlined in red on the
approved plan until the developer has secured the implementation of a programme of
archaeological works in accordance with a written scheme of investigation which has
been submitted to and approved in writing by the Planning Authority in consultation
with the West of Scotland Archaeological Service. Thereafter the developer shall
ensure that the programme of archaeological works is fully implemented and that all

Page 7

recording and recovery of archaeological resources within the development site is
undertaken to the satisfaction of the Planning Authority in consultation with the West of
Scotland Archaeological Service. 
Reason: In order to comply with the requirements of NPF4 Policy 16F. 
13. PP – ASHP Noise limits 
The noise level from the operation of the air source heat pumps hereby approved must
not exceed 42dB LAeq (5 min) at 1 metre from the window of a habitable room on the
façade of any neighbouring residential property. If, in the opinion of the Local Planning
Authority the proposed air source heat pumps result in any noise nuisance to the
occupant of any neighbouring dwelling the Applicant shall install noise mitigation
measures in agreement with the Planning Authority.
Reason: To ensure that the residential amenities that occupiers can reasonably expect
to enjoy are adequately protected. 
14. PP – Contaminated Land Assessment 
No development, demolition or ground-breaking works shall commence until a scheme
is submitted by the Developer (at their expense) to identify and assess potential
contamination on site and approved, by the Planning Authority, and is thereafter
implemented in accordance with the scheme so approved. The scheme shall be
undertaken by a competent person or persons in accordance with relevant
authoritative guidance including PAN 33 (2000) and BS10175:2011 or, in the event of
these being superseded or supplemented, the most up-to-date version(s) of any
subsequent revision(s) of, and/or supplement(s) to, these documents. This scheme
should contain details of proposals to investigate and remediate potential
contamination to the satisfaction of the Planning Authority, and must include:- 
a) A desk study and development of a conceptual site model including (where
necessary) a detailed site investigation strategy. The desk study and the scope and
method of recommended further investigations shall be agreed with the Council
prior to addressing parts b, c, and d of this condition. 
Should the desk study show the need for further assessment this will be undertaken in
the following sequence: 
a) A detailed investigation of the nature and extent of contamination on site, and
assessment of the risks such contamination presents.
b) Development and agreement of a remedial strategy (if required) to treat/ remove
contamination ensuring the site is made suitable for its proposed use (this shall
include a method statement, programme of works, and proposed verification plan).
c) Submission of a verification report for any agreed remedial actions detailing and
evidencing the completion of these works. 
Written confirmation from the Planning Authority, that the scheme has been
implemented and completed shall be required by the Developer before any
development hereby approved commences. Where remedial measures are required as
part of the development construction detail, commencement must be agreed in writing
with the Planning Authority.

Page 8

Reason: To ensure that the potential risks to human health, the water environment,
property, and, ecological systems arising from any identified land contamination have
been adequately addressed. 
15. PP – Arrangements for Waste 
No development shall commence until a waste strategy detailing how much waste the
proposal is expected to generate and detailing the arrangements for the storage,
separation and collection of waste from the site, including provision for the safe pick up
by refuse collection vehicles, have been submitted to an approved in writing by the
Planning Authority. Thereafter the duly approved provision shall be implemented prior
to the first occupation of the dwellings which it is intended to serve. 
Reason: In order to ensure that satisfactory arrangements have been made for dealing
with waste on the site in accordance with NPF4 Policy 12. 
16. PP – Materials 
No development shall commence until full details /samples of materials to be used in
the construction of the dwelling houses hereby approved have been submitted to and
approved in writing by the Planning Authority. The development shall thereafter be
completed using the approved materials or such alternatives as may be agreed in
writing with the Planning Authority. 
Reason: In order to integrate the development into its surroundings. 
17. PP – Restriction of PD Rights 
Notwithstanding the provisions of the Town and Country Planning (General Permitted
Development) (Scotland) Order 1992 (as amended), (or any Order revoking and re-
enacting that Order(s) with or without modifications), nothing in Article 2(4) of or the
Schedule to that Order, shall operate so as to permit, within the area subject of this
permission, any development referred to in Part 1 and Classes 1A, 1B, 1C, 1D, 2A, 2B,
3A, 3AA, 3B, 3C, 3D and 3E and Part 2 and Classes 8 and 9 of the aforementioned
Schedule, as summarised below: 
PART 1: DEVELOPMENT WITHIN THE CURTILAGE OF A DWELLINGHOUSE 
Class 1A: Any enlargement of a dwellinghouse by way of a single storey ground floor
extension, including any alteration to the roof required for the purpose of the
enlargement. 
Class 1B: Any enlargement of a dwellinghouse by way of a ground floor extension
consisting of more than one storey, including any alteration to the roof required for the
purpose of the enlargement. 
Class 1C: The erection, construction or alteration of any porch outside any external
door of a dwellinghouse. 
Class 1D: Any enlargement of a dwellinghouse by way of an addition or alteration to its
roof.
Class 2A: The erection, construction or alteration of any access ramp outside an
external door of a dwellinghouse.
Class 2B: Any improvement, addition or other alteration to the external appearance of
a dwellinghouse that is not an enlargement. 
Class 3A: The provision within the curtilage of a dwellinghouse of a building for any
purpose incidental to the enjoyment of that dwellinghouse or the alteration,
maintenance or improvement of such a building.

Page 9

Class 3AA: The provision within the curtilage of a dwellinghouse of a building for any
purpose incidental to the enjoyment of that dwellinghouse.
Class 3B: The carrying out of any building, engineering, installation or other operation
within the curtilage of a dwellinghouse for any purpose incidental to the enjoyment of
the dwellinghouse.
Class 3C: The provision within the curtilage of a dwellinghouse of a hard surface for
any purpose incidental to the enjoyment of that dwellinghouse or the replacement in
whole or in part of such a surface. 
Class 3D: The erection, construction, maintenance, improvement or alteration of any
deck or other raised platform within the curtilage of a dwellinghouse for any purpose
incidental to the enjoyment of that dwellinghouse. 
Class 3E: The erection, construction, maintenance, improvement or alteration of any
gate, fence, wall or other means of enclosure any part of which would be within or
would bound the curtilage of a dwellinghouse.
PART 2: SUNDRY MINOR OPERATIONS 
Class 8: Formation of means of access to an unclassified road. 
Class 9: Stone cleaning or painting of the exterior of a building. No such development
shall be carried out at any time within this Part and these Classes without the express
grant of planning permission. 
Reason: To protect the sensitive area and the setting of the proposed dwellinghouses,
in the interest of visual amenity and public health, from unsympathetic siting and
design of developments normally carried out without planning permission; these
normally being permitted under Article 2(4) of the Town and Country Planning (General
Permitted Development) (Scotland) Order 1992 (as amended). 
18. PP – Provision of Play/ Amenity Space 
No development shall commence until details for the provision and maintenance of
areas of communal open space and equipped play area(s) relating to the development
been submitted to and approved in writing by the Planning Authority. The details shall
comprise EITHER: 
Direct Provision of Play/Amenity Space: 
i) Provision to satisfy the minimum standards set out in the Development Plan; 6sqm
of equipped play space and 12sqm of informal open space per dwelling unit;
ii) Specification of play equipment to be installed, including surface treatments and
any means of enclosure, designed in accordance with the provisions of BS5696
(Play Equipment Intended for Permanent Installation Outdoors);
iii) Proposals for the timing of the implementation of the play area(s) in relation to the
phasing of the development;
iv) A maintenance schedule for communal open spaces and equipped play areas in
accordance with the provisions of BS5696 including details of on-going inspection,
recording and procedures for detailing with defects. 
The communal open space and equipped play area(s) shall be provided in accordance
with the duly approved details and shall be retained and maintained to the specified
standards thereafter. 
OR: 
Indirect Provision of Play/Amenity Space:

Page 10

The provision of a direct financial contribution to be held and administered by the
Council for the purpose of providing for the delivery of a commensurate play/amenity
space to serve the development within a later phase of the development of
designations H3029. 
The calculation of the value of the direct financial contribution will be based upon the
cost of delivery and ongoing maintenance of a facility which would meet the Council’s
minimum playspace requirements for the approved development as set out in the
Argyll and Bute Local Development Plan 2. 
The development hereby approved shall not be first occupied until such time as a
formal agreement between the developer and the Council for the payment and
administration of the direct financial contribution for the deferred provision of playspace
has been signed. 
Reason: In order to secure provision of communal open space and equipped play
areas within the development in accordance with the minimum standards set out in the
Development Plan. 
Note for the Applicant/Developer: It is noted that discharge of this condition by means
of ‘direct provision of play/amenity space’ would require to be the subject of a further
application for planning permission given that the development as approved does not
include sufficient site area to accommodate the requisite play/amenity space. It is
further advised that discharge of this condition by means of ‘indirect provision of
play/amenity space’ shall require to be the subject of an appropriate formal agreement
between the Developer and the Council under the provisions of either S75 of the Town
and Country Planning (Scotland) Act 1997, or the provisions of S69 of the Local
Government (Scotland) Act 1973. 
(Reference: Report by Head of Development and Economic Growth dated 4 December
2025, submitted) 
Councillor Dougie Philand returned to the meeting. 
5. MOWI SCOTLAND: REPLACE EXISTING 10 X 120M CIRCUMFERENCE
PENS WITH 6 X 160M CIRCUMFERENCE PENS (WITH A PARALLEL
MINOR RELOCATION INTO DEEPER WATER MOVING THE CARRADALE
SOUTH SITE CENTRE 99M EAST) AND SITING OF EXISTING FEED
BARGE IN A DIFFERENT LOCATION: CARRADALE SOUTH FISH FARM,
KILBRANNAN SOUND (REF: 24/01381/MFF) 
The Senior Planning Officer spoke to the terms of the report and to supplementary report
number 1 which advised that the Clyde Fishermen’s Association (CFA) had submitted two
further representations each reiterating their position of objection to the proposal.  A
response to these late representations from the Applicant was also contained within the
supplementary report.   Reference was also made to the contents of a late representation
received by Councillor Tommy MacPherson.  Councillor MacPherson’s raised some of the
issues also raised by CFA, along with a query regarding procedural matters during
handling of the planning application.  It was confirmed that the application was handled in
accordance with the requirements of the Town and Country Planning (Scotland) Act 1997,
the Town and Country Planning (Development Management Procedure) (Scotland)

Page 11

Regulations 2013, and the Council’s Scheme of Delegation as set out within the Council’s
Constitution. 
Members were also advised of an error within Section A of the report of handling which
referred to 8 x 4 pens rather than 6 x 3 pens and also of an error within the supplementary
report regarding the date of the resubmission of amended plans due to changes in the
moorings was in September 2025 only.  The other resubmissions were to address scaling
issues. 
The application is for a change of equipment and minor relocation of an existing marine
fish farm in the Kilbrannon Sound approximately 400m off the eastern shore of the Kintyre
Peninsula and will continue to be serviced from the company’s existing shore base located
at Carradale Harbour.  There is to be no change to the consented biomass for the site and
the proposal is part of a wider 5 year project by the Applicant to upgrade and modernise
fish farming pens to bring about a number of benefits. 
The proposal would accord with the Development Plan policy and it was recommended
that planning permission be granted subject to the conditions and reasons numbered 1 –
17 detailed in the report of handling, and updated condition 18 detailed in supplementary
report number 1. 
Motion 
To agree to hold a site visit and pre-determination hearing. 
Moved by Councillor John Armour, seconded by Councillor Fiona Howard. 
Amendment 
To agree to grant planning permission subject to the conditions and reasons numbered 1
– 17 detailed in the report of handling, and updated condition 18 detailed in supplementary
report number 1. 
Moved by Councillor Andrew Kain, seconded by Councillor Paul Kennedy. 
A vote was taken by calling the roll. 
Motion   Amendment 
Councillor Armour  Councillor Green
Councillor A Hampsey Councillor Kain
Councillor Hardie  Councillor Kennedy
Councillor Howard
Councillor Philand
Councillor Wallace 
The Motion was carried by 6 votes of 3 and the Committee resolved accordingly. 
Decision 
The Committee agreed to hold a site visit and pre-determination hearing.

Page 12

(Reference: Report by Head of Development and Economic Growth dated 1
December 2025 and Supplementary Report Number 1 dated 16 December 2025,
submitted) 
6. MOWI SCOTLAND: REPLACE EXISTING 10 X 120M CIRCUMFERENCE
PENS WITH 6 X 160M CIRCUMFERENCE PENS (WITH A PARALLEL
MINOR RELOCATION INTO DEEPER WATER MOVING THE CARRADALE
NORTH SITE CENTRE 79M EAST) AND SITING OF EXISTING FEED
BARGE IN A DIFFERENT LOCATION: CARRADALE NORTH FISH FARM,
KILBRANNAN SOUND (REF: 24/01382/MFF) 
The application is for a change of equipment and minor relocation of an existing marine
fish farm in the Kilbrannon Sound approximately 400m off the eastern shore of the Kintyre
Peninsula and will continue to be serviced from the company’s existing shore base located
at Carradale Harbour.  There is to be no change to the consented biomass for the site and
the proposal is part of a wider 5 year project by the Applicant to upgrade and modernise
fish farming pens to bring about a number of benefits. 
The proposal would accord with the Development Plan policy and it was recommended
that planning permission be granted subject to the conditions and reasons numbered 1 –
17 detailed in the report of handling, and updated condition 18 detailed in supplementary
report number 1. 
Motion 
To agree to hold a site visit and pre-determination hearing. 
Moved by Councillor John Armour, seconded by Councillor Amanda Hampsey. 
Amendment 
To agree to grant planning permission subject to the conditions and reasons numbered 1
– 17 detailed in the report of handling, and updated condition 18 detailed in supplementary
report number 1. 
Moved by Councillor Andrew Kain, seconded by Councillor Paul Kennedy. 
A vote was taken by calling the roll. 
Motion   Amendment 
Councillor Armour  Councillor Green
Councillor A Hampsey Councillor Kain
Councillor Hardie  Councillor Kennedy
Councillor Howard
Councillor Philand
Councillor Wallace 
The Motion was carried by 6 votes of 3 and the Committee resolved accordingly. 
Decision 
The Committee agreed to hold a site visit and pre-determination hearing.

Page 13

(Reference: Report by Head of Development and Economic Growth dated 4
December 2025 and Supplementary Report Number 1 dated 16 December 2025,
submitted) 
7. JOINT PUBLIC HEALTH PROTECTION PLAN 2025-2027 
Consideration was given to a report inviting Members to approve the Joint Public Health
Protection Plan 2025-2027 which outlines the health protection priorities for the period and
reviews the previous plan. 
Decision 
The Committee agreed: 
1. to approve the Joint Public Health Protection Plan (JHPP) for 2025-2027 (Appendix I),
recognising the key role of local authorities and environmental health; 
2. to formally reaffirm the appointments of the Regulatory Services and Building Standards
Manager, as the Council’s Designated Competent Person under the Public Health etc.
(Scotland) Act 2008, and the appointments of Depute Designated Competent Persons as
detailed in section 4.8 of this report and 4.2 of the JHPP; and 
3. that the Regulatory Services and Building Standards Manager signs the JHPP plan on
behalf of the Council and takes the necessary steps to deliver the plan. 
(Reference: Report by Executive Director with responsibility for Regulatory Services dated
17 December 2025 and NHS Highland Joint Health Protection Plan (JHPP) 2025-2027,
submitted) 
8. UPDATE ON RECENT TAYNUILT BESS APPEAL 
A report summarising a recent decision by Scottish Ministers following an Appeal in
respect of planning application reference 24/02083/PP was before the Committee for
information. 
Decision 
The Committee noted the contents of the report. 
(Reference: Report by Head of Development and Economic Growth dated 28 November
2025, submitted) 
9. LOCAL DEVELOPMENT PLAN 3 - EVIDENCE REPORT STAGE
ENGAGEMENT 
A report advising of the first stage of engagement for Local Development Plan 3 (LDP3)
was before the Committee for information. 
Decision 
The Committee noted the contents of this report and the engagement process that would
be undertaken to inform the LDP3 Evidence Report.

Page 14

(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 28 November 2025, submitted)