ARGYLL AND BUTE COUNCIL BUTE AND COWAL AREA
COMMITTEE
CUSTOMER SUPPORT SERVICES 4 JUNE 2024
AREA PERFORMANCE REPORT – FQ4 2023/24
1.0 BACKGROUND
1.1 This paper presents the Area Performance Report for Financial Quarter 4 2023/24
(January to March 2024) and illustrates the agreed performance measures.
1.2 The features of the Performance Report are as follows:-
 Indicators are grouped by Corporate Outcome.
 The data table for each indicator is colour coded to identify the level of
reporting.
o Area level measures are blue
o Council level measures are grey
o COI measures are white
 Each indicator details the
o Target, Actual and Performance status (Green / Red / No Target) for the
current and four previous financial quarters.
o Commentary for the current financial quarter only.
o Narrative explaining the performance trend e.g. This indicator is above
Target and performance has improved since the last reporting period.
o Where appropriate a Performance Trend Line has been added.
o The name of the Responsible Officer.
o Where possible performance is presented at both Area and Council
level.
1.3 The commentary for each indicator helps ‘Tell Our Story’ and enables Elected
Members to put the performance data into perspective and understand if an issue is
local in nature or should be escalated up to a Strategic Committee. 
1.4 As part of our improvements to performance reporting and making best use of the
digital technology available to us, the information contained in this report is also
available in your online scorecard. If support is required to navigate the online
scorecard please contact lorna.gillies@argyll-bute.gov.uk
1.5 To improve the response to performance queries, it is requested that should there
be any queries that either the Responsible Person or Kay Owen are contacted.
This should enable some queries being resolved or clarified prior to the Area
Committee meeting, and therefore being carried forward as Actions at a
subsequent meeting.
2.0 RECOMMENDATIONS

Page 2

2
2.1 It is recommended that the Area Committee –
a) Notes and considers the performance and supporting commentary as
presented.
3.0 IMPLICATIONS
3.1 Policy All of the indicators in this report are based on 
agreed Council policy.
3.2 Financial All indicators with financial implications are actively
managed through agreed budget monitoring 
processes.
3.3 Legal All appropriate legal implications are complied with.
3.4 HR All HR implications are actively managed  
through agreed Wellbeing and Management 
monitoring processes.
3.5 Fairer Scotland Duty See below.
3.5.1 Equalities All activities comply with Equal Opportunities/Fairer
Scotland Duty policies and obligations.
3.5.2 Socio-economic Duty All activities comply with the council’s socio- 
economic duty.
3.5.3 Islands Duty All activities comply with the council’s islands
duty.
3.6 Climate Change The Council is committed to working towards net 
zero.
3.7 Risk Without this information Elected Members are less
informed of activities within their area.
3.8 Customer Service All activities with customer feedback or insight are
rigorously monitored for improvement.
3.9 The Rights of the Child (UNCRC): This report highlights examples of how the
Council is committed to, and working towards reducing
child poverty and improving outcomes for every child.  
Kirsty Flanagan, Executive Director with responsibility for Customer Support
Services
Jane Fowler
Head of Customer Support Services
15 MAY 2024
For further information, please contact:
Kay Owen
Team Lead - Organisational Development Project Office - Customer Support Services
01546 604073
Appendix 1: FQ4 2023/24 B&C Performance Report

Page 3

Appendix 1
Page 1
All Areas
FQ4 2023/24 Overall Performance Summary
The information presented is a summary of the agreed measures.
Unless stated otherwise, performance is presented at both Area and Council-wide levels.
The measures show the performance against target for the current and previous three reporting periods with an explanation of performance trend.
The data table for each indicator is colour coded to identify the level of reporting:
 Area level measures are blue.
 Council level measures are grey.
 Corporate Outcome Indicators (COIs) are white.
Where appropriate a Trend Line has been added to illustrate movement in ‘Actual’ over the reporting period.

Page 4

Appendix 1
Page 2
Performance Reporting
All Areas .................................................................................................................................................................................................................................................. 1
Performance Reporting .............................................................................................................................................................................................................................. 2
Corporate Outcome No.1 – People live active, healthier and independent lives ............................................................................................................................ 5
COI – Maximise distribution of Scottish Welfare Fund ................................................................................................................................................................. 5
Corporate Outcome No.1 – People live active, healthier and independent lives ............................................................................................................................ 6
COI – Percentage of clients satisfied that they are better able to deal with their financial problems following our support and intervention ...................... 6
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................... 7
Number of parking penalty notices issued – Bute and Cowal ...................................................................................................................................................... 7
Number of parking penalty notices issued – Argyll and Bute ....................................................................................................................................................... 7
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................... 8
Car parking income to date – Bute and Cowal .............................................................................................................................................................................. 8
Car parking income to date – Argyll and Bute ............................................................................................................................................................................... 9
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................. 10
Dog fouling – total number of complaints – Bute and Cowal ..................................................................................................................................................... 10
Dog fouling – total number of complaints – Argyll and Bute ...................................................................................................................................................... 10
Corporate Outcome No.3 – Children and young people have the best possible start ................................................................................................................... 12
COI – Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring plans in place .... 12
Corporate Outcome No.3 – Children and young people have the best possible start ................................................................................................................... 13
COI – Provide quality meals with cost margins to all pupils ....................................................................................................................................................... 13
Corporate Outcome No.4 – Education, skills and training maximises opportunities for all .......................................................................................................... 14
Maximise the percentage of 16-19 years olds participating in education, training or employment – Bute and Cowal .......................................................... 14
Maintain the percentage of 16-19 years olds in Argyll and Bute participating in education, training or employment services – Argyll and Bute ................ 14
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 16
Number of affordable social sector new builds completed per annum – Bute and Cowal ....................................................................................................... 16

Page 5

Appendix 1
Page 3 
Number of affordable social sector new builds completed per annum – Argyll and Bute ........................................................................................................ 16
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 17
Percentage of pre-planning application enquiries processed within 20 working days – Bute and Cowal ................................................................................ 17
Percentage of pre-planning application enquiries processed within 20 working days – Argyll and Bute ................................................................................ 17
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 19
Householder planning applications – average number of weeks to determine – Bute and Cowal ........................................................................................... 19
Householder planning applications – average number of weeks to determine – Argyll and Bute ........................................................................................... 20
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 21
COI – Number of new homeless applicants who required temporary accommodation this period ......................................................................................... 21
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 22
COI – Maintain the percentage of local suppliers that benefit from the awards of contracts via the procurement portal .................................................... 22
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 23
COI – Increase the number of community benefits that are delivered through contracts we award locally ........................................................................... 23
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 24
Street lighting – percentage of faults repaired within 10 days – Bute and Cowal ..................................................................................................................... 24
The percentage of street lighting faults are completed within 10 working days – Argyll and Bute .......................................................................................... 24
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 25
Total number of complaints regarding waste collection – Bute ................................................................................................................................................. 25
Total number of complaints regarding waste collection – Cowal ............................................................................................................................................... 25
Total number of complaints regarding waste collection – Argyll and Bute ............................................................................................................................... 26
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 27
COI – Percentage of waste recycled, composted and recovered ................................................................................................................................................ 27
Renewi (formerly Shanks) – Percentage of waste recycled, composted and recovered ........................................................................................................... 28
Islands – Percentage of waste recycled, composted and recovered .......................................................................................................................................... 28
H&L – Percentage of waste recycled, composted and recovered ............................................................................................................................................... 29

Page 6

Appendix 1
Page 4
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 30
COI – The number of tonnes of waste sent to landfill ................................................................................................................................................................. 30
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 31
LEAMS (Local Environment Audit and Management System) – Bute ......................................................................................................................................... 31
LEAMS (Local Environment Audit and Management System) – Cowal ...................................................................................................................................... 31
LEAMS (Local Environment Audit and Management System) – Argyll and Bute ....................................................................................................................... 32
Making It Happen ............................................................................................................................................................................................................................. 33
Teacher sickness absence – Bute and Cowal ............................................................................................................................................................................... 33
Teacher sickness absence – Argyll and Bute ................................................................................................................................................................................ 33
Making It Happen ............................................................................................................................................................................................................................. 35
LGE staff (non-teacher) sickness absence – Bute and Cowal ...................................................................................................................................................... 35
LGE staff (non-teacher) sickness absence – Argyll and Bute ....................................................................................................................................................... 35
Making It Happen ............................................................................................................................................................................................................................. 37
COI – Increase the percentage of all self-service automated contacts ....................................................................................................................................... 37

Page 7

Appendix 1
Page 5
Corporate Outcome No.1 – People live active, healthier and independent lives
COI – Maximise distribution of Scottish Welfare Fund
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only.
Reporting Period Target Actual Status
FQ4 2022/23 95.3% 144.0% Green
FQ1 2023/24 95.3% 112.9% Green
FQ2 2023/24 95.3% 134.3% Green
FQ3 2023/24 95.3% 138.2% Green
FQ4 2023/24 95.3% 128.6% Green
This indicator for FQ4 has exceeded the target however the actual has decreased since the last reporting period.
FQ4 Comment 
At 31st March 2024 we have a total spend of £589,168. This represents an overspend of £130,884 on our programme funding allocation of £458,284. However
year end spend was less than we had projected due to a reduction in spend between January and March, which was less than in previous years. Scottish
Government have confirmed that we have the same programme funding for 2024/25 and the Council has approved a £250,000 cost and demand pressure for that
year.  We will continue to monitor spend closely on a month to month basis going forward.
Responsible person: Fergus Walker

Page 8

Appendix 1
Page 6
Corporate Outcome No.1 – People live active, healthier and independent lives
COI – Percentage of clients satisfied that they are better able to deal with their financial problems following our support and
intervention
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only.
Reporting Period Target Actual Status
FQ4 2022/23 100% 95% Red
FQ1 2023/24 100% 100% Green
FQ2 2023/24 100% 100% Green
FQ3 2023/24 100% 100% Green
FQ4 2023/24 100% 100% Green
This indicator for FQ4 has met the target with no change in performance since the last reporting period.
FQ4 Comment
This is a voluntary survey with no obligation for clients to respond either in full or in part. It is also common for incomplete returns to be received. In FQ4 2023/24,
12 survey forms were distributed to clients. 12 were returned. Of these 12 returns, 11 responded to the question relating to being better able to deal with their
financial problems. Of these 11 respondees, 11 responded positively, whilst 0 responded negatively. Accordingly, 100% of clients that responded were positive
about their experience i.e. no negative comments or responses were reported.
Responsible person: Lee Roberts

Page 9

Appendix 1
Page 7
Corporate Outcome No.2 – People live in safer and stronger communities
Number of parking penalty notices issued – Bute and Cowal
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 No target 415 No target
FQ1 2023/24 No target 296 No target
FQ2 2023/24 No target 257 No target
FQ3 2023/24 No target 226 No target
FQ4 2023/24 No target 214 No target
This indicator for FQ4 shows the number of parking penalty notices has decreased since the last reporting period.
FQ4 Comment
Bute/Rothesay very limited enforcement due to continuing lining/signage deterioration or incorrect markings - officers are looking to get the lining redone when
the lining teams are available and weather permitting. Disabled bay misuse and pay and display non-compliance high.
Responsible person: Hugh O’Neill
Number of parking penalty notices issued – Argyll and Bute
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 No target 1,332 No target
FQ1 2023/24 No target 1,816 No target
FQ2 2023/24 No target 1,172 No target
FQ3 2023/24 No target 1,015 No target
FQ4 2023/24 No target 1,196 No target
This indicator for FQ4 shows the number of parking penalty notices has increased since the last reporting period.
FQ4 Comment
Historical lining and signage issues continue in certain areas of Argyll & Bute - officers are arranging for lining to be redone when the lining teams are available and
weather permitting. Given it is off-season the rate of non-compliance in some areas is disappointing.
Responsible person: Hugh O’Neill

Page 10

Appendix 1
Page 8
Corporate Outcome No.2 – People live in safer and stronger communities
Car parking income to date – Bute and Cowal
Performance is presented cumulatively for both Area and Council-wide levels.  For individual car parks, the income is presented on a quarterly basis.
Reporting Period Target
(Cumulative)
Actual
(Cumulative) Status
FQ4 2022/23 £85,667 £42,381 Red
FQ1 2023/24 £20,912 £13,741 Red
FQ2 2023/24 £52,197 £34,027 Red
FQ3 2023/24 £71,239 £48,303 Red
FQ4 2023/24 £86,511 £64,271 Red
This indicator for FQ4 shows the cumulative amount of income collected is lower than the cumulative target.  There is no performance trend as this data is
cumulative.
FQ4 Comment
Although showing a £22k shortfall this could be due to the weather. At this time there is no specific reason that we are aware of which has caused the shortfall. All
car parks are open and the warden is present within the area.  We completed the upgrade to the parking meters (within the pay & display car parks) in Autumn of
2023. Over the next 12 months we expect to get a baseline which will assist in estimating future trends - the back office system for the new meters is excellent.
Responsible person: Hugh O’Neill
Actual quarterly income collected in Bute and Cowal for FQ3 and FQ4.
Car Park Location FQ3 Actual FQ4 Actual
Guildford Square, Rothesay £204 £1,604
Church Street, Dunoon £0 £0
Swimming Pool, Dunoon £2,062 £2,120
Dunoon Pier £1,714 £1,565
Moir Street, Dunoon £3,446 £3,508
Argyll Street, Dunoon £2,817 £3,117
Jane Villa, Dunoon £4,033 £4,055

Page 11

Appendix 1
Page 9
Car Park Location FQ3 Actual FQ4 Actual
B&C (parking permits) £0 £0
Total £14,276 £15,969
Car parking income to date – Argyll and Bute
Performance is presented cumulatively for both Area and Council-wide levels.
Reporting Period Target
(Cumulative)
Actual
(Cumulative) Status
FQ4 2022/23 £993,968 £817,788 Red
FQ1 2023/24 £234,056 £253,705 Green
FQ2 2023/24 £584,204 £486,151 Red
FQ3 2023/24 £797,331 £807,348 Green
FQ4 2023/24 £968,262 £937,090 Red
This indicator for FQ4 shows the cumulative amount of income collected is lower than the cumulative target.  There is no performance trend as this data is
cumulative.
FQ4 Comment
Overall, there is a 3% deficit in relation to the target. The new IPS parking meters, alongside its associated back office system, will allow better analysis of parking
trends. The next 12 months will provide a solid baseline for future trends.
Responsible person: Hugh O’Neill

Page 12

Appendix 1
Page 10
Corporate Outcome No.2 – People live in safer and stronger communities
Dog fouling – total number of complaints – Bute and Cowal
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 No target 25 No target
FQ1 2023/24 No target 13 No target
FQ2 2023/24 No target 11 No target
FQ3 2023/24 No target 14 No target
FQ4 2023/24 No target 19 No target
This indicator for FQ4 shows the number of dog fouling complaints has increased since the last reporting period.
FQ4 Comment
Unfortunately, the number of dog fouling complaints received for the Bute and Cowal area has risen again this quarter with 9 complaints received for Bute and 10
received for Cowal. The Warden service will continue to monitor the situation.
Responsible person: Tom Murphy
Dog fouling – total number of complaints – Argyll and Bute
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 No target 77 No target
FQ1 2023/24 No target 60 No target
FQ2 2023/24 No target 51 No target
FQ3 2023/24 No target 46 No target
FQ4 2023/24 No target 65 No target
This indicator for FQ4 shows the number of dog fouling complaints has increased since the last reporting period.

Page 13

Page 11
Appendix 1
FQ4 Comment
It is disappointing that the number of dog fouling complaints received has risen from 46 to 65 this quarter. There was one fine issued from the Kintyre area. The
Warden service will continue to monitor and patrol in an effort to reduce the number of complaints.
Responsible person: Tom Murphy

Page 14

Appendix 1
Page 12 
Corporate Outcome No.3 – Children and young people have the best possible start 
COI – Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring
plans in place 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ4 2022/23 100% 100% Green
FQ1 2023/24 100% 100% Green
FQ2 2023/24 100% 100% Green
FQ3 2023/24 100% 100% Green
FQ4 2023/24 100% 100% Green 
This indicator for FQ4 has met the target with no change in performance since the last reporting period. 
FQ4 Comment
Each care experienced child and young person enrolled in an authority school has tracking and monitoring plans in place via our education management
information system knowns as Seemis. Data collated includes attendance, exclusion, progress and attainment and wellbeing information. The Virtual Head
Teacher (VHT) for Care Experienced Children and Young People (CECYP) works closely with the education data team and receives monthly reports specific to
CECYP. The VHT offers both support and challenge to Designated Managers for CECYP across authority settings to ensure each young person has the correct
framework of support to help them achieve success. The profile of our CECYP continues to be raised through system improvements, training opportunities,
information sharing (as appropriate) leading to greater consideration of personalised support at all stages of the young person’s educational journey. We continue
to develop and refine our tracking and monitoring systems to ensure data is relevant and meaningful. This happens through self-evaluation and linking with wider
local authorities to ensure best practice. Next steps include developing a system to formally track and monitor CECYP who are out-with our authority schools. A
data sharing agreement is currently being produced for this purpose.
Responsible person: Louise Chisholm

Page 15

Appendix 1
Page 13 
Corporate Outcome No.3 – Children and young people have the best possible start 
COI – Provide quality meals with cost margins to all pupils 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ4 2022/23 +/-5.00% -2.56% Green
FQ1 2023/24 +/-5.00% 5.00% Green
FQ2 2023/24 +/-5:00% -7.07% Red
FQ3 2023/24 +/-5.00% 4.12% Green
FQ4 2023/24 +/-5.00% -3.44% Green 
This indicator for FQ4 is below the +/-5.00% target variance however performance has increased since the last reporting period. 
FQ4 Comment
Work is on-going to monitor schools that have a food cost percentage outwith the +/-5% target.
B&C 1.88%, H&L -2.73%, MAKI -4.78%, OLI 1.02%"
B&C 0.54%
H&L -0.52%
MAKI -2.82%
OLI 6.92%
Responsible person: Christine Boyle

Page 16

Appendix 1
Page 14 
Corporate Outcome No.4 – Education, skills and training maximises opportunities for all 
Maximise the percentage of 16-19 years olds participating in education, training or employment – Bute and Cowal 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 94.00% 91.80% Red 
FQ1 2023/24 94.00% 92.19% Red
FQ2 2023/24 94.00% 94.34% Green
FQ3 2023/24 94.00% 92.97% Red
FQ4 2023/24 94.00% 91.16% Red 
This indicator for FQ4 below target and performance has decreased since the last reporting period. 
FQ4 Comment
As of 21st March 2024, the Participation figure (16-19 year-olds in employment, training or education) in Bute and Cowal was 804 young people, which equates to
91.16%. This is 2.84% below target and 4.44% below the annual Argyll and Bute Participation figure of 95.60%, which was released by Skills Development Scotland
at the end of August 2023. The Participation figure of 91.16% for FQ4 of 2023/24 is a decrease of 1.81% on the Participation figure for FQ3.
Responsible person: Jennifer Crocket 
Maintain the percentage of 16-19 years olds in Argyll and Bute participating in education, training or employment services – Argyll and
Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 94.00% 93.62% Red 
FQ1 2023/24 94.00% 93.75% Red
FQ2 2023/24 94.00% 95.94% Green
FQ3 2023/24 94.00% 94.37% Green
FQ4 2023/24 94.00% 93.59% Red 
This indicator for FQ4 is below target and performance has decreased since the last reporting period.

Page 17

Appendix 1
Page 15 
FQ4 Comment
As of 21st March 2024, the Participation figure (16-19 year-olds in employment, training or education) for the whole of Argyll and Bute was 3697 young people,
which equates to 93.59%. This is 0.41% below  target and 2.01% below the annual Argyll and Bute Participation figure of 95.60%, which was released by Skills
Development Scotland at the end of August 2023. The Participation figure of 93.59% for FQ4 of 2023/24 is a decrease of 0.78% on the Participation figure for FQ3.
Responsible person: Jennifer Crocket

Page 18

Appendix 1
Page 16 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Number of affordable social sector new builds completed per annum – Bute and Cowal 
Reporting Period Target Actual Status
FQ4 2022/23 0 0 Green
FQ1 2023/24 0 0 Green
FQ2 2023/24 0 0 Green
FQ3 2023/24 4 4 Green
FQ4 2023/24 0 0 Green 
This indicator for FQ4 shows the number of completions has met the target for the reporting period. 
FQ4 Comment
No social sector new builds were due for completion this period.
Responsible person: Kelly Ferns 
Number of affordable social sector new builds completed per annum – Argyll and Bute 
Reporting Period Target Actual Status
FQ4 2022/23 67 67 Green
FQ1 2023/24 26 26 Green
FQ2 2023/24 40 40 Green
FQ3 2023/24 0 0 Green
FQ4 2023/24 0 0 Green 
This indicator for FQ4 shows the number of completions has met the target for the reporting period. 
FQ4 Comment
No social sector new builds were due for completion this period.
B&C 0 MAKI 0
H&L 0 OLI 0
Responsible person: Kelly Ferns

Page 19

Appendix 1
Page 17 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Percentage of pre-planning application enquiries processed within 20 working days – Bute and Cowal 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 75.0% 55.6% Red 
FQ1 2023/24 75.0% 27.3% Red
FQ2 2023/24 75.0% 16.7% Red
FQ3 2023/24 75.0% 21.4% Red
FQ4 2023/24 75.0% 27.8% Red 
This indicator for FQ4 is below target however performance has increased since the last reporting period. 
FQ4 Comment
Performance across the Development Management Service continues to be impacted as it works through a backlog of casework that has accumulated through the
Covid pandemic and which has been exacerbated by extended periods of operating with reduced staffing levels due to issues with recruitment to vacant posts,
and the introduction of National Planning Framework 4. Whilst vacancies across the service have now largely been filled the focus of officers remains geared
toward the resolution of statutory casework with the handling of pre-application enquiries afforded lower priority in caseload management. To assist with the
management of reduced customer expectations the target for responding to pre-app enquiries has been temporarily extended to 6 weeks. During FQ4 18 pre-apps
were responded to within B&C. 33.3% were issued within 6 weeks.
Responsible person: Peter Bain 
Percentage of pre-planning application enquiries processed within 20 working days – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 75.0% 55.4% Red 
FQ1 2023/24 75.0% 47.5% Red
FQ2 2023/24 75.0% 49.1% Red
FQ3 2023/24 75.0% 55.0% Red
FQ4 2023/24 75.0% 52.4% Red 
This indicator for FQ4 is below target and performance has decreased since the last reporting period.

Page 20

Appendix 1
Page 18 
FQ4 Comment
Performance across the Development Management Service continues to be impacted as it works through a backlog of casework that has accumulated through the
Covid pandemic and which has been exacerbated by extended periods of operating with reduced staffing levels due to issues with recruitment to vacant posts,
and the introduction of National Planning Framework 4. Whilst vacancies across the service have now largely been filled the focus of officers remains geared
toward the resolution of statutory casework with the handling of pre-application enquiries afforded lower priority in caseload management. To assist with the
management of reduced customer expectations the target for responding to pre-app enquiries has been temporarily extended to 6 weeks. During FQ4 48 pre-apps
were responded to within OLI. 93.8% were issued within 6 weeks. This excellent performance is indicative of the more settled position of the OLI DM team.
Responsible person: Peter Bain

Page 21

Appendix 1
Page 19 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Householder planning applications – average number of weeks to determine – Bute and Cowal 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 8.0 weeks 20.2 weeks Red 
FQ1 2023/24 8.0 weeks 30.1 weeks Red
FQ2 2023/24 8.0 weeks 28.3 weeks Red
FQ3 2023/24 8.0 weeks 23.5 weeks Red
FQ4 2023/24 8.0 weeks 17.2 weeks Red 
This indicator for FQ4 has not met the target however performance has increased since the last reporting period.  (Lower is best) 
FQ4 Comment
This measure only relates to planning applications received for alterations to existing premises.
Performance across the Development Management Service continues to be impacted as it works through a backlog of casework that has accumulated through the
Covid pandemic and which has been exacerbated by extended periods of operating with reduced staffing levels due to issues with recruitment to vacant posts,
and the introduction of National Planning Framework 4. Improving resource availability has allowed the focus of the DM Service to shift from the prioritisation of
the most significant applications to addressing the accrued backlog of older applications. The determination of a higher-than-normal volume of older cases has a
significant impact on "average time taken" performance measures as a relatively small number of older cases can skew the outcome. It is also noted that these
performance measures are based on "raw data" and as such have not been adjusted to take into account delays to determination out with the control of the
planning authority. FQ4 has seen the determination of 2 'legacy' applications  and continued high volume of newer case work. The determination of an increasing
proportion of older casework items during FQ4 has impacted negatively on overall performance from FQ3. 72% of applications determined in FQ4 were less than 6
months old; these items were determined in an average time of 12.0 weeks.
Responsible person: Peter Bain

Page 22

Appendix 1
Page 20 
Householder planning applications – average number of weeks to determine – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 8.0 weeks 17.3 weeks Red 
FQ1 2023/24 8.0 weeks 21.6 weeks Red
FQ2 2023/24 8.0 weeks 18.1 weeks Red
FQ3 2023/24 8.0 weeks 16.8 weeks Red
FQ4 2023/24 8.0 weeks 20.0 weeks Red 
This indicator for FQ4 has not met the target and performance has decreased since the last reporting period (lower is best). 
FQ4 Comment
This measure only relates to planning applications received for alterations to existing premises.
Performance across the Development Management Service continues to be impacted as it works through a backlog of casework that has accumulated through the
Covid pandemic and which has been exacerbated by extended periods of operating with reduced staffing levels due to issues with recruitment to vacant posts,
and the introduction of National Planning Framework 4. Improving resource availability has allowed the focus of the DM Service to shift from the prioritisation of
the most significant applications to addressing the accrued backlog of older applications. The determination of a higher-than-normal volume of older cases has a
significant impact on "average time taken" performance measures as a relatively small number of older cases can skew the outcome. It is also noted that these
performance measures are based on "raw data" and as such have not been adjusted to take into account delays to determination out with the control of the
planning authority. FQ4 has seen the determination of 2 'legacy' applications and continued high volume of newer case work. The determination of an increasing
proportion of older casework items during FQ4 has impacted negatively on overall performance from FQ3. 72% of applications determined in FQ4 were less than 6
months old; these items were determined in an average time of 12.0 weeks.
Responsible person: Peter Bain

Page 23

Appendix 1
Page 21 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Number of new homeless applicants who required temporary accommodation this period 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 No target 30 No target 
FQ1 2023/24 No target 32 No target
FQ2 2023/24 No target 36 No target
FQ3 2023/24 No target 26 No target
FQ4 2023/24 No target 30 No target 
This indicator for FQ4 shows the number of applicants has increased since the last reporting period. 
FQ4 Comment
During FQ4, the housing service provided temporary accommodation for 30 new homeless households. B&C: 14 households (4 x Registered Social Landlord
Property, 1 x Private Sector Property, 6 x Serviced Accommodation, 3 x Bed & Breakfast). H&L: 4 households (2 x Private Sector Property, 2 x Bed & Breakfast).
MAKI: 1 household (1 x Bed & Breakfast). OLI: 11 households (1 x Private Sector Property, 8 x Supported Accommodation, 2 x Bed & Breakfast). 
Please note: 
• The Registered Social Landlord and Private Rented Sector properties are leased by the Council and sub-let to homeless households as temporary
accommodation.
• Serviced Accommodation is available in Cowal and Helensburgh and is for single people providing an en-suite bedroom and shared kitchen facilities.
• Supported accommodation is provided in Lorn by Blue Triangle Housing Association.
• Accommodation may be offered outwith the HMA area that the homeless application was taken due to availability, i.e. application taken in Oban and the
applicant offered accommodation in Dunoon as there was no accommodation available in Oban. 
B&C 14
H&L 4
MAKI 1
OLI 11
Responsible person: Morven Macintyre

Page 24

Appendix 1
Page 22 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Maintain the percentage of local suppliers that benefit from the awards of contracts via the procurement portal 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 20.0% 22.5% Green 
FQ1 2023/24 20.0% 10.8% Red
FQ2 2023/24 20.0% 26.5% Green
FQ3 2023/24 20.0% 27.8% Green
FQ4 2023/24 20.0% 14.3% Red 
This indicator for FQ4 is below and performance has decreased since the last reporting period. 
FQ4 Comment
From the 63 contracts awarded during FQ4, 19 contracts received local bids. The nature of the types of contracts awarded can impact on submission of local
bidders. Of the 19 contracts, 9 were awarded to local suppliers (47.4%) with an estimated total contract value of £2.5m. The Procurement, Commercial and
Contract Management Team will continue to support local suppliers by providing useful information on the Council's website.
Responsible person: Anne MacColl-Smith

Page 25

Appendix 1
Page 23 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Increase the number of community benefits that are delivered through contracts we award locally 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ4 2022/23 No target 43 No target
FQ1 2023/24 No target - No target
FQ2 2023/24 No target 37 No target
FQ3 2023/24 No target - No target
FQ4 2023/24 No target 37 No target 
This indicator is reported in FQ2 and FQ4. 
This indicator for FQ4 shows the number of community benefits has remained the same since the last reporting period. 
FQ4 Comment
During FQ4, 37 community benefits have been achieved through contract management. A full report will be published on the Council's website at this location:
https://www.argyll-bute.gov.uk/business-and-licensing/selling-council/procurement-useful-links-and-documents - following a meeting with the Procurement
Board at the end of April 2024.
Responsible person: Anne MacColl-Smith

Page 26

Appendix 1
Page 24 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
Street lighting – percentage of faults repaired within 10 days – Bute and Cowal 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 75% 30% Red 
FQ1 2023/24 75% 54% Red
FQ2 2023/24 75% 45% Red
FQ3 2023/24 75% 37% Red
FQ4 2023/24 75% 90% Green 
This indicator for FQ4 is above target however performance has increased since the last reporting period. 
FQ4 Comment
We have been working well to meet targets in Cowal and Bute as shown in the figures.
Responsible person: Tom Murphy 
The percentage of street lighting faults are completed within 10 working days – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 75% 32% Red 
FQ1 2023/24 75% 37% Red
FQ2 2023/24 75% 43% Red
FQ3 2023/24 75% 46% Red
FQ4 2023/24 75% 49% Red 
This indicator for FQ4 is below target however performance has increased since the last reporting period. 
FQ4 Comment
In January, February and March we have low percentage figures due to absence affecting the OLI and MAKI areas. Contractors were carrying out work in MAKI and
OLI.  As a result the percentage of faults being attended to within 10 working days was not met. Bute and Cowal had no issues as shown in the 90% figure.
Responsible person: Tom Murphy

Page 27

Appendix 1
Page 25 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
Total number of complaints regarding waste collection – Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 No target 3 No target 
FQ1 2023/24 No target 1 No target
FQ2 2023/24 No target 0 No target
FQ3 2023/24 No target 2 No target
FQ4 2023/24 No target 0 No target 
This indicator for FQ4 shows the number of waste collection complaints has decreased since the last reporting period. 
FQ4 Comment
There were no waste collection complaints this quarter for the Isle of Bute, this is an excellent level of service given the number of properties serviced.
Responsible person: Tom Murphy 
Total number of complaints regarding waste collection – Cowal 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 No target 3 No target 
FQ1 2023/24 No target 9 No target
FQ2 2023/24 No target 20 No target
FQ3 2023/24 No target 2 No target
FQ4 2023/24 No target 0 No target 
This indicator for FQ4 shows the number of waste collection complaints has decreased since the last reporting period. 
FQ4 Comment
Cowal received no waste collection complaints for the months of January, February and March. Excellent service provided by the Waste teams.
Responsible person: Tom Murphy

Page 28

Appendix 1
Page 26 
Total number of complaints regarding waste collection – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 No target 53 No target 
FQ1 2023/24 No target 67 No target
FQ2 2023/24 No target 101 No target
FQ3 2023/24 No target 18 No target
FQ4 2023/24 No target 7 No target 
This indicator for FQ4 shows the number of waste collection complaints has decreased since the last reporting period. 
FQ4 Comment
There were only 7 waste collection complaints received for the whole of Argyll and Bute over the months of January, February and March. Given the areas covered
and the various bins serviced, domestic, recycling, glass and food, this is an excellent level of service.
Responsible person: Tom Murphy

Page 29

Appendix 1
Page 27 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
COI – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 45.0% 52.0% Green 
FQ1 2023/24 45.0% 47.6% Green
FQ2 2023/24 45.0% 59.8% Green
FQ3 2023/24 45.0% 49.0% Green
FQ4 2023/24 45.0% 74.0% Green 
This indicator for FQ4 is above target and performance has increased since the last reporting period. 
FQ4 Comment
74% recycling, composting and recovery (44.6% recycling/composting plus 29.4% recovery). Barr closed their landfill operations from 1st January and their waste
operations as at 31st March. Barr sent all general waste received during the quarter to an energy from waste plant which has greatly increased recovery and
reduced landfill during the quarter. Renewi sent over 2000 tonnes of previously stockpiled green waste for composting and recovery during the quarter. Renewi
also sent some general waste to an energy from waste plant as part of a trial during January 24. These actions have improved recovery figures in particular plus
reduced landfill during the quarter. 2023/24 F/Year figures overall are 58.2% recycling, composting and recovery (44.2% recycling/composting plus 14.0%
recovery).
Responsible person: John Blake

Page 30

Appendix 1
Page 28 
Renewi (formerly Shanks) – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 No target 61.9% No target 
FQ1 2023/24 No target 53.0% No target
FQ2 2023/24 No target 68.7% No target
FQ3 2023/24 No target 55.3% No target
FQ4 2023/24 No target 66.5% No target 
This indicator for FQ4 shows the percentage of waste recycled has increased since the last reporting period. 
FQ4 Comment
66.5% recycling, composting and recovery (47.1% recycling/composting plus 19.4% recovery). Renewi sent over 2000 tonnes of previously stockpiled green waste
for composting and recovery during the quarter. Renewi also sent some general waste to an energy from waste plant as part of a trial during January 24. Both
actions have improved composting and recovery figures plus reduced landfill during the quarter.2023/24 F/Year figures overall are 62.3% recycling, composting
and recovery (46.7% recycling/composting plus 15.6% recovery).
Responsible person: John Blake 
Islands – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 No target 35.9% No target 
FQ1 2023/24 No target 39.2% No target
FQ2 2023/24 No target 35.6% No target
FQ3 2023/24 No target 34.2% No target
FQ4 2023/24 No target 41.5% No target 
This indicator for FQ4 shows the percentage of waste recycled has increased since the last reporting period.

Page 31

Appendix 1
Page 29 
FQ4 Comment
41.5% recycling, composting and recovery. Higher than normal mainly due to over 100 tonnes of wood being sent for recycling during the quarter from the
Gartbreck (Islay) waste and recycling site. F/Year to date figures overall are 37.6% recycling, composting and recovery (37.6% recycling/composting and 0%
recovery).
Responsible person: John Blake 
H&L – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 No target 34.5% No target 
FQ1 2023/24 No target 40.1% No target
FQ2 2023/24 No target 41.6% No target
FQ3 2023/24 No target 41.5% No target
FQ4 2023/24 No target 100.0% No target 
This indicator for FQ4 shows the percentage of waste recycled has increased since the last reporting period. 
FQ4 Comment
100% recycling, composting and recovery during the quarter i.e. no landfill (39.6% recycling/composting plus 60.4% recovery). Barr Environmental closed their
landfill operations from 1st January and their waste operations completely on 31st March. Barr sent all general waste received during the quarter to an energy
from waste plant, which has greatly increased recovery and resulted in no landfill during the quarter. 2023/24 F/Year figures overall are 54.6% recycling,
composting and recovery (40.5% recycling/composting plus 14.1% recovery).
Responsible person: John Blake

Page 32

Appendix 1
Page 30 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
COI – The number of tonnes of waste sent to landfill 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 5,000 4,610 Green 
FQ1 2023/24 5,850 5,075 Green
FQ2 2023/24 5,550 5,510 Green
FQ3 2023/24 5,100 4,253 Green
FQ4 2023/24 5,000 2,567 Green 
This indicator for FQ4 is below target (lowest is best). 
FQ4 Comment
Barr Environmental (contractor for Helensburgh and Lomond's general waste) closed their landfill operations from 1st January and their waste operations as at
31st March. Barr sent all general waste received during the quarter to an energy from waste plant which has greatly reduced landfill during the quarter.  Renewi
also sent some general waste to an energy from waste plant as part of a trial during January 24. These actions have significantly reduced landfill during the quarter
and therefore the tonnage of municipal biodegradable waste to landfill was well within target.
Responsible person: John Blake

Page 33

Appendix 1
Page 31 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
LEAMS (Local Environment Audit and Management System) – Bute
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 73 79 Green 
FQ1 2023/24 73 79 Green
FQ2 2023/24 73 76 Green
FQ3 2023/24 73 80 Green
FQ4 2023/24 73 81 Green 
This indicator for FQ4 is above target and performance has increased since the last reporting period. 
FQ4 Comment
The LEAMS figure for this quarter is again high, showing a good level of street cleanliness.
Responsible person: Tom Murphy 
LEAMS (Local Environment Audit and Management System) – Cowal
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 73 77 Green 
FQ1 2023/24 73 77 Green
FQ2 2023/24 73 77 Green
FQ3 2023/24 73 77 Green
FQ4 2023/24 73 76 Green 
This indicator for FQ4 is above target however performance has decreased since the last reporting period. 
FQ4 Comment
The Cowal area has again this quarter exceeded the LEAMS target.
Responsible person: Tom Murphy

Page 34

Appendix 1
Page 32 
LEAMS (Local Environment Audit and Management System) – Argyll and Bute
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 73 83 Green 
FQ1 2023/24 73 84 Green
FQ2 2023/24 73 83 Green
FQ3 2023/24 73 85 Green
FQ4 2023/24 73 83 Green 
This indicator for FQ4 is above target however performance has decreased since the last reporting period. 
FQ4 Comment
The overall level of street cleanliness this quarter shows 83. This is a very good level of street cleanliness carried out by the Amenity teams.
Responsible person: Tom Murphy

Page 35

Appendix 1
Page 33 
Making It Happen 
Teacher sickness absence – Bute and Cowal 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 No target 3.61 days No target 
FQ1 2023/24 No target 3.64 days No target
FQ2 2023/24 No target 2.00 days No target
FQ3 2023/24 No target 3.72 days No target
FQ4 2023/24 No target 4.00 days No target 
This indicator for FQ4 shows the number of sickness absence days has increased since the last reporting period. 
FQ4 Comment
Work days lost has increased on the same quarter last year by 0.39 work days. There has been a 0.28 day increase on Q3 this year. Most work days lost have been
due to Stress/Depression/Mental Health followed by Infections.
Responsible person: Jennifer Crocket 
Teacher sickness absence – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 No target 2.48 days No target 
FQ1 2023/24 No target 2.15 days No target
FQ2 2023/24 No target 1.25 days No target
FQ3 2023/24 No target 2.82 days No target
FQ4 2023/24 No target 2.82 days No target 
This indicator for FQ4 shows the number of sickness absence days has remained the same since the last reporting period.

Page 36

Appendix 1
Page 34 
FQ4 Comment
Work days lost has increased on the same quarter last year by 0.34 of a day. Against Q3 this year work days lost have remained exactly the same. Most work days
lost have been due to Stress/Depression/Mental Health followed by Infections. Actions to address Stress/Depression/Mental Health absences are included in the
Wellbeing Implementation Plan including a new Employee Assistance Programme, exploring a Stress Audit and support for managers. It is unusual for infections to
feature in the top 3 reasons for work days lost and further analysis of the reasons for this and benchmarking will be carried out.
Responsible person: Jennifer Crocket (B&C and MAK) and Wendy Brownlie (H&L and OLI)

Page 37

Appendix 1
Page 35 
Making It Happen 
LGE staff (non-teacher) sickness absence – Bute and Cowal 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 No target 4.65 days No target 
FQ1 2023/24 No target 4.46 days No target
FQ2 2023/24 No target 3.50 days No target
FQ3 2023/24 No target 4.42 days No target
FQ4 2023/24 No target 4.64 days No target 
This indicator for FQ shows the number of sickness absence days has increased since the last reporting period. 
FQ4 Comment
Work days lost per FTE stable around the same as the same quarter last year. There has been a small increase on the quarter before of 0.22 of a day. Most work
days lost have been due to Stress/Depression/Mental Health followed by Infections.
Responsible person: Carolyn Cairns 
LGE staff (non-teacher) sickness absence – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 No target 4.04 days No target 
FQ1 2023/24 No target 3.53 days No target
FQ2 2023/24 No target 3.18 days No target
FQ3 2023/24 No target 3.73 days No target
FQ4 2023/24 No target 4.12 days No target 
This indicator for FQ4 shows the number of sickness absence days has increased since the last reporting period.

Page 38

Appendix 1
Page 36 
FQ4 Comment
Work days lost per FTE is around the same as the same quarter last year - just a very small increase of 0.08 work days lost. There has been an increase of 0.39 work
days on the last quarter this year. Most days lost are due to Stress/Depression/Mental Health followed by Infections. Actions to address Stress/Depression/Mental
Health absences are included in the Wellbeing Implementation Plan including a new Employee Assistance Programme, exploring a Stress Audit and support for
managers. It is unusual for infections to feature in the top 3 reasons for work days lost and further analysis of the reasons for this and benchmarking will be carried
out.
Responsible person: Carolyn Cairns

Page 39

Appendix 1
Page 37 
Making It Happen 
COI – Increase the percentage of all self-service automated contacts 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ4 2022/23 70.0% 72.2% Green 
FQ1 2023/24 70.0% 80.7% Green
FQ2 2023/24 70.0% 72.1% Green
FQ3 2023/24 70.0% 72.7% Green
FQ4 2023/24 70.0% 70.1% Green 
This indicator for FQ4 is above target however performance has decreased since the last reporting period. 
FQ4 Comment
In FQ4 there was 38,538 transactions dealt with by Customer Service Agents (29.9%) and 90,224 automated or self-service transactions (70.1%) so the 70.0%
target was exceeded. The full year statistics for 2023-24 showed that of the 593,362 customer interactions handled by the Customer Engagement Team, 443,283
(75%) were completed wholly by digital self-service.
Responsible person: Robert Miller