1 
ARGYLL AND BUTE COUNCIL 
DEVELOPMENT AND ECONOMIC GROWTH 
PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE 
UPDATE ON RECENT TAYNUILT BESS APPEAL
_________________________________________________________________________  
OUR REFERENCE:  24/02083/PP  
DPEA REFERENCE: PPA-130-2094   
CASE DETAIL: Installation of an energy storage facility including battery
enclosures, transformers, substation, grid connection, infrastructure,
earthworks, vehicular access, landscaping and associated works 
SITE ADDRESS: Land to the immediate west of Taynuilt Substation, Taynuilt  
APPLICANT:  Downing Renewable Developments 
STATUS:   Appeal Allowed by decision dated 14 November 2025 
_______________________________________________________________________  
1. INTRODUCTION 
1.1 Members may recall that determination of this application was initially deferred at PPSL
to hold a pre-determination hearing before making a decision to approve or refuse the
proposals. Officers had recommended that the application should be approved subject
to conditions. Following this PPSL decision to hold a hearing, the applicant
subsequently lodged an appeal against non-determination in advance of the proposed
hearing date removing the determination of the application from the Planning Authority.
This is an unusual occurrence but is within the rights of the applicant to do so. 
1.2 This report summarises the decision made by the Reporter appointed by the DPEA 
2. RECOMMENDATION 
2.1 Members are asked to note the contents of the report. 
3. REPORTERS CONCLUSIONS (Paragraph Numbers taken from Appeal Decision) 
The following excerpts have been taken from the Reporter’s conclusions: 
Preliminary Matters (Please note these paragraphs are not numbered in the appeal decision)  
“Whilst there have been criticisms of this decision being taken out of the hands of the council,
the appellant has exercised a statutory right of appeal as the application had not been
determined by the council within prescribed timescales. 
I noted requests for a hearing to be held to allow the community to express its views on this
proposal. The purpose of a hearing would ordinarily be to explore contradictory or unclear
written evidence. In this case I am satisfied that I have sufficient information on all matters,
including those raised in representations from the local community together with my own
observations during my site inspection, to be able to determine this appeal without the need
for a hearing.”

Page 2

2 
Principle of Development 
“3. NPF4 policy 11 ‘Energy’ provides overarching support in principle for all forms of
renewable, low-carbon and zero emissions technologies, and this explicitly extends to
battery energy storage as established by part a)(iii) of the policy. This in-principle support is
framed more widely by policy 1 ‘Tackling the climate and nature crises’, which requires
significant weight to be given to these matters in decision-making. 
5. It is also beyond the scope of this appeal to explore whether locations, other than
that proposed, may be more preferable for the development to be located. There is no
policy basis for such an approach, and I must assess the proposal on its own merits, rather
than undertake a comparative assessment of theoretical alternative sites. I have noted that
the appellant has provided a site selection report which sets out why, in its view, the appeal
site is preferable from an environmental and technical perspective. It is still the case that an
unsuitable site would not become appropriate simply because of an absence of a better
alternative in the area.” 
Landscape and Visual Effects 
“9. The site is well contained within the landscape, by virtue of rising land to the south,
and trees and vegetation along the southern verge of the A85. Despite the development’s
rather incongruous character in a rural setting, once beyond the immediate vicinity of the
proposed development its effect on landscape character would rapidly diminish. The very
limited wider visibility of the site, the fairly modest scale of the proposed development and
its proximity to the existing substation combine to limit its effect on the character of the
landscape in which it would be seen directly, or seen from indirectly. I am satisfied that the
development’s overall impact on landscape features and character would be negligible on
this basis. 
10. The visual effects of the development would similarly be highly localised. There
would be glimpsing and partial views of the development from the A85, which would be
seen in the context of the neighbouring substation. It would not interrupt any longer range
views available from the road. It would be sufficiently distant from Taynuilt to not have any
bearing on the setting of the village and the visual amenity this provides.” 
Noise/Residential Amenity 
“17. In my judgement, the greatest potential for the proposed development to have
adverse residential amenity effects would be as a result of noise. Noise is one of the
various considerations identified by NPF4 policy 11(e) and LDP policy 30. A revised noise
impact assessment (dated 31 March 2025) was submitted by the appellant to the council,
which predicts that the highest noise levels would be at the nearest noise-sensitive
receptors (which as identified above are Fairy Hill Croft and the consented dwelling on land
at croft 4) but this would not exceed the representative background sound level. 
18. The assessment inevitably applies a number of assumptions in making that
prediction. Given the appellant has not to date specified the precise equipment
manufacturers and models for example, it is conceivable that the noise emissions could differ,
but the assessment is intended to present a realistic worst case scenario. The
council’s environmental health officer has reviewed the assessment, and accepts its
findings, including that internal noise levels set by BS8233: 2014 would not be exceeded at
the nearest properties, whether windows are open or closed. I attach weight to this finding,
but nevertheless, I consider that in order to provide an adequate safeguard against noise

Page 3

3 
disturbance occurring, a condition should be imposed (which I note the council has also
recommended) to require the development to not exceed the noise levels predicted in the
appellant’s revised noise impact assessment. Subject to this requirement, there is no
reason to conclude that noise would result in a loss of residential amenity at any property. 
19. In conclusion, I am satisfied that all existing and consented dwellings in the general
vicinity of the proposed development would not be subject to a significant loss of residential
amenity, with most properties being entirely unaffected. In this regard the proposal does not
give rise to any conflict with the relevant provisions of NPF4 policy 11 and LDP policy 30.” 
Fire Risk 
“21. It is not the role of the planning system to manage fire risk, and this is addressed by
other regulatory regimes. It is however capable of being a material consideration insofar as
where there might be spatial and land use implications for managing any residual risk. 
22. Whilst the possibility of a BES fire cannot be ruled out, it also cannot be described as
likely. In my view it is reasonable to assert from the policy support provided for BES by
NPF4 policy 11 (which is provided without any reference to locational principles relating to
fire risk) that there is no reason to anticipate or expect a fire to occur. There is nothing
before me which would distinguish a BES from many other less novel types of development
in terms of residual fire risk. 
23. There would be particular characteristics of a BES fire, should it occur, giving rise to
specific fire containment and suppression methods. This has led to the National Fire Chiefs
Council publishing best practice guidance for fire and rescue services, which also contains
design principles that have some limited relevance to the planning process. This proposed
development would provide two separate access points to the facility, together with a
perimeter road. The red line development boundary is drawn sufficiently widely to provide
flexibility over the final alignment of the access roads, so that at least one access could be
used in the event of a fire regardless of wind direction. A water tank is proposed, to provide
an immediate adequate on-site supply. Sufficient separation between the BES units and
proposed landscaping/vegetation screening could be ensured as part of a scheme to be
required by planning condition, thereby minimising any risk of a fire spreading.” 
“28. Concern has been raised that water used for fire suppression would contain
pollutants, with run-off potentially entering the River Awe. The proposal is accompanied by
a surface water drainage strategy which takes this into account and outlines how this risk
would be mitigated. Whilst it is incumbent on the appellant to manage the residual direct
and indirect risk of a fire including the potential for pollution, as already noted my
assessment must confine itself to the operational nature of the development and land use
implications of this. It is not relevant to a development management decision to have regard
to all possible impacts of a fire when the likelihood of such an event is low. 
29. All told, whilst I acknowledge the concerns expressed by some of the community
relating to the possibility of a battery fire, I am satisfied that, from a land use perspective,
this matter is not a constraint to development for the reasons outlined above. Detailed
matters of access, and buffers between battery units and vegetation can be secured by
condition, but the residual possibility of a fire occurring, or hypothetical broader implications
of such an incident, are not matters for the planning system to regulate. This is further
reinforced by SEPA’s position that it only provides site-specific advice on the implications of
accidents if it falls within the Control of Major Accident Hazard (COMAH) regulatory regime,
which BES developments do not. I do not consider many of the provisions of NPF4
policy 23 (‘Health and safety’) to be engaged, as a BES proposal is not ordinarily deemed to
involve hazardous substances, nor is it recognised as a major accident hazard. Part (b) of

Page 4

4 
NPF4 policy 4 ‘Natural places’ has been satisfied by an appropriate assessment having
been carried out.” 
Biodiversity Net Gain 
“33. NPF4 policy 3 ‘Biodiversity’ includes criteria which apply to major development. The
findings of the ecological appraisal submitted by the appellant indicates that there would be
limited effects on protected species or their supporting habitats, and it recommends various
good practice measures to mitigate the residual effects. On the basis of this evidence I
consider that there would be limited scope for negative effects even without mitigation, so
subject to conditions to require the suggested measures to be implemented, I am satisfied
that the mitigation hierarchy has been followed. Part (iv) of the policy also requires
significant biodiversity enhancements to be provided, in addition to mitigation. The
ecological appraisal makes suggestions in this regard, and I consider there to be clear
potential to approach proposed planting for the purposes of screening the development in a
way that would also maximise its biodiversity benefits. The red line site boundary is
sufficiently extensive to enable on-site significant biodiversity enhancement, but this is a
matter which can appropriately be addressed by requiring a scheme to be submitted to and
agreed by the council. Subject to this, the proposal would accord with NPF4 policy 3 overall.” 
Overall Conclusions 
“36. There is explicit policy support in principle for the proposed development, and the
development plan is also instructive that significant weight is to be given both to the
contribution it would make to greenhouse gas emissions reduction targets (achieved here
by storing renewable energy until it is required) and the climate crisis more widely. 
37. I acknowledge that there are widely held concerns and objections to the proposal
from some of the local community, but these partly stem from safety concerns which extend
beyond the scope of my assessment. Based on my foregoing reasoning I find the adverse
effects of the development to be limited and highly localised. Some of these matters would
be required to be subject to conditions, as would other considerations such as the need for
archaeological investigations, and decommissioning plans. In the face of the policy
presumption in favour of development and having assessed the site-specific characteristics
and its suitability for the proposed development, I find there to be no conflict with the
development plan in terms of applicable thematic or locational considerations, against
which the in-principle support would need to be balanced.” 
“39. I therefore conclude, for the reasons set out above, that the proposed development
accords overall with the relevant provisions of the development plan and that there are no
material considerations which would still justify refusing to grant planning permission. I have
considered all the other matters raised insofar as these are capable of being material
considerations, but there are none which would lead me to alter my conclusions.” 
Full details of the case can be found at the following link: 
Scottish Government - DPEA - Case Details     
4.0 IMPLICATIONS 
Policy: None. 
Financial: None.   
Legal: None

Page 5

5 
HR: None
Customer Service: None
Risk: None
Climate Change: None
Fairer Scotland Duty: None
Equalities: None
Consumer Duty: None
Island Communities: None
Children’s Rights and Wellbeing: None 
Author: David Moore   Date: 28.11.25 
Fergus Murray 
Head of Development and Economic Growth