Democracy Spraffa

B&C

Argyll and Bute Council · 3 December 2024
Back to Bute and Cowal Area Committee — 3 December 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Classification: OFFICIAL#
Indicator Responsible Person Reported Page
COI - Maximise distribution of Scottish Welfare Fund Fergus Walker A&B only 3
COI - Percentage of clients satisfied that they are better able to deal with their financial problems following
our support and intervention Lee Roberts A&B only 4
Number of parking penalty notices issued Hugh O'Neill Area 5
Car parking income to date (cumulative) Hugh O'Neill Area 6 - 7
Number of dog fouling complaints Tom Murphy Area 8
COI - Increase the percentage of our care experienced young people that have the recommended additional
tracking and monitoring plans in place Louise Chisholm A&B only 9
COI - Provide quality meals within cost margins to all pupils Christine Boyle A&B only 10
Maximise the percentage of 16-19 year olds participating in education, training or employment Jennifer Crocket Area 11
2024/25 FQ2 Bute and Cowal Performance Report
The information presented is a summary of the agreed measures.
Unless stated otherwise, performance is presented at both Area and Council-wide levels.
The measure shows the performance against target for the current previous three reporting periods with an explanation of performance trend.
Where appropriate a trend line has been added to illustrate movement in 'Actual' over the reporting period.
Corporate Outcome: People live active, healthier and happier lives
Corporate Outcome: People live in safer and stronger communities
Corporate Outcome: Children and young people have the best possible start
Corporate Outcome: Education, skills and training maximises opportunities for all

Page 2

Classification: OFFICIAL#
Indicator Responsible Person Reported Page
Number of affordable social sector new builds completed per annum Kelly Ferns Area 12
Percentage of pre-planning application enquiries processed within 20 working days Peter Bain Area 13 - 14
Average number of weeks to determine householder planning applications Peter Bain Area 15 - 16
COI - Number of new homeless applicants who required temporary accommodation this period Morven Macintyre A&B only 17
COI - Maintain the percentage of local suppliers that benefit from the award of contracts via the procurement
portal Anne MacColl-Smith A&B only 18
COI - Increase the number of community benefits that are delivered through contracts we award locally Anne MacColl-Smith A&B only 19
Percentage of street lighting faults repaired within 10 days Tom Murphy Area 20
Number of waste collection complaints Tom Murphy Area 21 - 22
COI (part) - Percentage of waste recycled, composted and recovered John Blake Area 23 - 24
COI - Number of tonnes of waste sent to landfill John Blake A&B only 25
COI - LEAMS (Local Environment Audit and Management System) Tom Murphy Area 26 - 27
COI - Teacher sickness absence Jennifer Crocket (B&C and MAKI)
Wendy Brownlie (H&L and OLI) Area 28
COI - LGE staff (including non-Teacher) sickness absence Carolyn Cairns Area 29
COI - Increase the percentage of all self-service automated contacts Robert Miller A&B only 30
Corporate Outcome: We have an infrastructure that supports sustainable growth
Corporate Outcome: Making it happen
Corporate Outcome: Our economy is diverse and thriving

Page 3

Classification: OFFICIAL#
Period Area Target Actual Variance Status FQ2 Commentary
2024/25 FQ2 A&B 95.3% 72.9% -22.4% Red - Actual
below Target
As of 30 September 2024, our expenditure stands at £258,079. However as our confirmed budget allocation has increased to
£708,284 which includes £458,284 from the Scottish Government programme fund and £250,000 provided by the Council to
address cost pressures.  Therefore this represents an underspend of £96,065 to date. The number of applications to the fund
is down by 11% in this quarter, however the average amount of award is higher compared to last year. As the next 6 months
can be the most challenging for our vulnerable claimants we expect increases in both applications and spend going forward.
Period Actual FQ1 Commentary
2023/24 FQ2 134.3%
2023/24 FQ3 138.2%
2023/24 FQ4 128.6%
2024/25 FQ1 94.0%
2024/25 FQ2 72.9%
Corporate Outcome - People live active, healthier and happier lives
COI - Maximise distribution of Scottish Welfare Fund
Responsible Person: Fergus Walker
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ2 is lower than the target and performance has decreased since the last reporting period.
Actual trend line
As of 30 June 2024, our expenditure stands at £107,676, which is £6,894 below the profiled budget. This reduction in cost is
primarily because the cost of white goods has decreased, leading to an average reduction of £120 in our standard
community care grant awards. The number of awards we have made has increased this year and we are able to support
more vulnerable claimants within the budget.
3

Page 4

Classification: OFFICIAL#
Period Area Target Actual Variance Status FQ2 Commentary
2024/25 FQ2 A&B 100% 100% 0% Green - Actual
meets Target
This is a voluntary survey with no obligation for clients to respond either in full or in part. It is also common for incomplete
returns to be received. In FQ2 2024/25, 14 survey forms were distributed to clients. 4 were returned. Of these 4 returns, 4
responded to the question relating to being better able to deal with their financial problems. Of these 4 respondents, 4
responded positively, whilst 0 responded negatively. Accordingly, 100% of clients that responded were positive about their
experience i.e. no negative comments or responses were reported.
Period Actual FQ1 Commentary
2023/24 FQ2 100%
2023/24 FQ3 100%
2023/24 FQ4 100%
2024/25 FQ1 100%
2024/25 FQ2 100%
Actual trend line
This is a voluntary survey with no obligation for clients to respond either in full or in part. It is also common for incomplete
returns to be received. In FQ1 2024/25, 19 survey forms were distributed to clients. 1 was returned. Of this 1 return, 1
responded to the question relating to being better able to deal with their financial problems. Of this 1 respondent 1
responded positively, whilst 0 responded negatively. Accordingly, 100% of clients that responded were positive about their
experience i.e. no negative comments or responses were reported.
Corporate Outcome - People live active, healthier and happier lives
COI - Percentage of clients satisfied that they are better able to deal with their financial problems following our support and intervention
Responsible Person: Lee Roberts
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ2 meets the target with no change in performance since the last reporting period.
4

Page 5

Classification: OFFICIAL#
Period Area Target Actual Variance Status FQ2 Commentary
2024/25 FQ2 B&C No Target 195 N/A N/A There has been a decrease in PCNs issued for the Bute and Cowal area as the warden has been covering the Luss area in line
with the new Traffic Regulation order.
Period Actual FQ1 Commentary
2023/24 FQ2 257
2023/24 FQ3 226
2023/24 FQ4 214
2024/25 FQ1 251
2024/25 FQ2 195
2024/25 FQ2 A&B No Target 2,302 N/A N/A There is a substantial increase since last year's FQ2, this is mainly due to the extra patrols in the Luss area on the back of the
Traffic Regulation order being progressed and enforced as per the wishes of local Luss Village residents.
Period Actual FQ1 Commentary
2023/24 FQ2 1,172
2023/24 FQ3 1,015
2023/24 FQ4 1,196
2024/25 FQ1 1,763
2024/25 FQ2 2,302
This indicator for FQ2 shows the number of parking penalty notices has increased since the last reporting period.
Actual trend line
In comparison to last year's FQ1 figure, there is a very slight overall drop in PCNs issued across the full area of 3%. This is in
line with budget expectations.
Corporate Outcome - People live in safer and stronger communities
Number of parking penalty notices issued
Responsible Person: Hugh O'Neill
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ2 shows the number of parking penalty notices has decreased since the last reporting period.
Actual trend line
There has been a 15% drop in PCNs issued in the B&C area in comparison to last year’s figures, this is in part due to the
warden covering other areas such as Luss due to a vacancy in the H&L area. The poor weather may also be a contributing
factor in potential visitor numbers to the area.
5

Page 6

Classification: OFFICIAL#
In comparison to last year's FQ1 figure, there is a very slight overall drop in PCNs issued across the full area of 3%. This is in
line with budget expectations.
6

Page 7

Classification: OFFICIAL#
Period Area Target Actual Variance Status FQ2 Commentary
2024/25 FQ2 B&C £20,132 £27,788 £7,656 Green - Actual
exceeds Target
Despite the relatively poor summer weather, B&C Parking income has seen an increase in budget recovery, this may well be
due to an increased presence by the local warden in Dunoon coupled with a possible rise in visitor numbers.
Period Target Actual FQ1 Commentary
2023/24 FQ2 £52,197 £34,027
2023/24 FQ3 £71,239 £48,303
2023/24 FQ4 £86,511 £64,271
2024/25 FQ1 £17,135 £7,755
2024/25 FQ2 £20,132 £27,788
£3,854
£1,337
£3,717
£1,810
£5,641
£5,943
£5,486
£0
£27,788
Dunoon Pier
Moir Street,Dunoon
Argyll Street, Dunoon
Jane Villa, Dunoon
B&C
Total
Actual trend line
There is no trend as this data is
cumulative as of FQ1 each financial year.
At present we are unable to explain why there is a shortfall in the Bute and Cowal area. The weather may well be a
contributing factor along with the cost-of-living crisis which may prevent people from travelling. All car parks are open, and
the warden is in the area as often as possible.
Income Collected During FQ2
Guildford Square, Rothesay
Church Street, Dunoon
Swimming Pool, Dunoon
Corporate Outcome - People live in safer and stronger communities
Car parking income to date (cumulative)
Responsible Person: Hugh O'Neill
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ2 shows the cumulative amount of income has exceeded the cumulative target.
7

Page 8

Classification: OFFICIAL#
Period Area Target Actual Variance Status FQ2 Commentary
2024/25 FQ2 A&B £373,922 £391,990 £18,068 Green - Actual
exceeds Target
Events in Oban, the new TRO in Luss as well as a full time warden in Dunoon has most likely been the source of extra income
coming through our parking areas.
Period Target Actual FQ1 Commentary
2023/24 FQ2 £584,204 £486,151
2023/24 FQ3 £797,331 £807,348
2023/24 FQ4 £968,262 £937,090
2024/25 FQ1 £289,219 £247,216
2024/25 FQ2 £373,922 £391,990
Corporate Outcome - People live in safer and stronger communities
Car parking income to date (cumulative)
Responsible Person: Hugh O'Neill
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ2 shows the cumulative amount of income has exceeded the cumulative target.
Actual trend line
There is no trend as this data is
cumulative as of FQ1 each financial year.
At present we are unable to explain why there is an overall shortfall across all areas. The weather may well be a contributing
factor along with the cost-of-living crisis which may prevent people from travelling. All car parks are open, and the wardens
are in the areas as often as possible.
8

Page 9

Classification: OFFICIAL#
Period Area Target Actual Variance Status FQ2 Commentary
2024/25 FQ2 B&C No Target 12 N/A N/A For the Bute and Cowal area the total number of dog fouling complaints received this quarter was 12.  Bute received 9 and
Cowal 3. 
Period Actual FQ1 Commentary
2023/24 FQ2 11
2023/24 FQ3 14
2023/24 FQ4 19
2024/25 FQ1 12
2024/25 FQ2 12
2024/25 FQ2 A&B No Target 33 N/A N/A
This quarter has seen the number of dog fouling complaints reduce significantly to 33 throughout the whole Argyll and Bute
Council area, this is very good and is partyly down to the presence of the Warden Service.  In August the service recruited
another Amenity Warden who will cover the Mid Argyll, Kintyre and Islay areas.
Period Actual FQ1 Commentary
2023/24 FQ2 51
2023/24 FQ3 46
2023/24 FQ4 65
2024/25 FQ1 57
2024/25 FQ2 33
This indicator for FQ2 shows the number of dog fouling complaints has decreased since the last reporting period.
Actual trend line
This quarter the section has received a total of 57 dog fouling complaints and only 1 fine was issued in the Kintyre area. This
is quite a high number and our Warden service where possible will continue to monitor this when they can. Dog fouling fines
are difficult to enforce as the Warden would actually have to witness the act and even then, the dog owner may have a
medical reason as to why they are unable to pick up after their dog. However, this will not deter the Wardens and they will
continue to educate people on this matter.
Actual trend line
The number of dog fouling complaints has reduced in the Bute and Cowal area this quarter with only 12 reported. There
were 2 complaints received for the Cowal area and 10 received for Bute.
Corporate Outcome - People live in safer and stronger communities
Number of dog fouling complaints
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ2 shows the number of dog fouling complaints has remained the same since the last reporting period.
9

Page 10

Classification: OFFICIAL#
This quarter the section has received a total of 57 dog fouling complaints and only 1 fine was issued in the Kintyre area. This
is quite a high number and our Warden service where possible will continue to monitor this when they can. Dog fouling fines
are difficult to enforce as the Warden would actually have to witness the act and even then, the dog owner may have a
medical reason as to why they are unable to pick up after their dog. However, this will not deter the Wardens and they will
continue to educate people on this matter.
10

Page 11

Classification: OFFICIAL#
Period Area Target Actual Variance Status FQ2 Commentary
2024/25 FQ2 A&B 100% 100% 0% Green - Actual
meets Target
Each care experienced child and young person enrolled in an authority school has tracking and monitoring plans in place via
our education management information system knowns as Seemis. Data collated includes attendance, exclusion, progress
and attainment and wellbeing information. The Virtual Head Teacher (VHT) for Care Experienced Children and Young People
(CECYP) works closely with the education team and receives monthly reports specific to CECYP. The VHT has focussed
attainment meets with Designated Managers for CECYP across authoriy settings. Our tacking and monitoring data is
scrutinised during these meets to ensure each young person has the correct framework of support to help them achieve
success. Our 2023 - 24 data (still embargoed to quality assurace process) evidences the positive impact of this enhaced level
of scrutiny, support and challenge. The profile of our CECYP continues to be raised through system improvements, training
opportunities, information sharing (as appropriate) leading to greater consideration of personalised support at all stages of
the young peron's educational journey. Feedback evidences that wider school staff have increased awareness of the needs of
our CECYP cohort. We are able to work with Virtual Head Teachers from Scottish wide local authorities to develop a data
sharing agreeemnt to support cross authority tracking and monitoring to support CECYP hosted out with Argylll and Bute.
Period Actual FQ1 Commentary
2023/24 FQ2 100%
2023/24 FQ3 100%
2023/24 FQ4 100%
2024/25 FQ1 100%
2024/25 FQ2 100%
Actual trend line
Each care experienced child and young person enrolled in an authority school has tracking and monitoring plans in place via
our education management information system knowns as Seemis. Data collated includes attendance, exclusion, progress
and attainment and wellbeing information. The Virtual Head Teacher (VHT) for Care Experienced Children and Young People
(CECYP) works closely with the education data team and receives monthly reports specific to CECYP. The VHT offers both
support and challenge to Designated Managers for CECYP across authority settings to ensure each young person has the
correct framework of support to help them achieve success. The profile of our CECYP continues to be raised through system
improvements, training opportunities, information sharing (as appropriate) leading to greater consideration of personalised
support at all stages of the young person’s educational journey. We continue to develop and refine our tracking and
monitoring systems to ensure data is relevant and meaningful. This happens through self-evaluation and linking with wider
local authorities to ensure best practice. Next steps include developing a system to formally track and monitor CECYP who
are out-with our authority schools. A data sharing agreement is currently being produced for this purpose.
Corporate Outcome - Children and young people have the best possible start
COI - Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring plans in place
Responsible Person: Louise Lawson
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ2 meets the target with no change in performance since the last reporting period.
11

Page 12

Classification: OFFICIAL#
Period Area Target Actual Variance Status FQ2 Commentary
2024/25 FQ2 A&B +/-5.00% -1% -4% Green - Actual
exceeds Target
We continue to monitor schools that are not achieving the +/- 5% target.
B&C -5.65%, H&L -5.52%, MAKI 6.55%, OLI 3.26
Period Actual FQ1 Commentary
2023/24 FQ2 -7.07%
2023/24 FQ3 4.12%
2023/24 FQ4 -3.44%
2024/25 FQ1 0.48%
2024/25 FQ2 -1.37%
COI - Provide quality meals within cost margins to all pupiles
Responsible Person: Christine Boyle
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ2 within the +/-5.00% variance however performance has decreased since the last reporting period.
Actual trend line
Work continues to monitor all schools that are out with the food cost percentage target.
B&C 8.89%    H&L 0.25%    MAKI -4.68%    OLI 1.58%
Corporate Outcome - Children and young people have the best possible start
12

Page 13

Classification: OFFICIAL#
Period Area Target Actual Variance Status FQ2 Commentary
2024/25 FQ2 B&C 94.00% 95.16% 1.16% Green - Actual
exceeds Target
As of 10th October 2024 the participation figure (16–19-year-olds in employment, training or education) in Bute and Cowal
was 924 young people, which equates to 95.16%. This is 1.16% above the target and 0.86% above the annual Argyll and Bute
participation figure of 94.3% which was released by Skills Development Scotland at the end of August 2024. The participation
figure of 95.16% for FQ2 of 2024/25 is an increase of 1.60% on the participation figure for FQ1 of 2024/25.
Period Actual FQ1 Commentary
2023/24 FQ2 94.34%
2023/24 FQ3 92.97%
2023/24 FQ4 91.16%
2024/25 FQ1 93.56%
2024/25 FQ2 95.16%
2024/25 FQ2 A&B 94.00% 95.80% 1.80% Green - Actual
exceeds Target
As of 10th October 2024, the participation figure (16-19 year-olds in employment, training or education) for the whole of
Argyll and Bute was 4,174 young people, which equates to 95.80%. This is 1.80% above the target and 1.50% above the
annual Argyll and Bute participation figure of 94.30% which was released by Skills Development Scotland at the end of
August 2024. The participation figure of 95.80% for FQ2 of 2024/25 is an increase of 0.81% on the participation figure for
FQ1 of 2024/25.
Period Actual FQ1 Commentary
2023/24 FQ2 95.94%
2023/24 FQ3 94.37%
2023/24 FQ4 93.59%
2024/25 FQ1 94.99%
2024/25 FQ2 95.80%
Actual trend line
As of 4th July 2024, the participation figure (16-19 year-olds in employment, training or education) for the whole of Argyll
and Bute was 4,287 young people, which equates to 94.99%. This is 0.99% above the target and 0.61% below the annual
Argyll and Bute participation figure of 95.60%, which was released by Skills Development Scotland at the end of August 2023.
The participation figure of 94.99% for FQ1 of 2024/25 is an increase of 1.40% on the participation figure for FQ4 of 2023/24.
This indicator for FQ2 exceeds the target and performance has increased since the last reporting period.
Actual trend line
As of 4th July, the participation figure (16–19-year-olds in employment, training or education) in Bute and Cowal was 944
young people, which equates to 93.56%. this is 0.44% below the target and 2.04% below the annual Argyll and Bute
participation figure of 95.60%, which was released by Skills Development Scotland at the end of August 2023. The
participation figure of 93.56% for FQ1 of 2024/25 is an increase of 2.40% on the participation figure for FQ4 of 2023/24.
Corporate Outcome - Our economy is diverse and thriving
Maximise the percentage of 16-19 year olds participating in education, training or employment
Responsible Person: Jennifer Crocket
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ2 exceeds the target and performance has increased since the last reporting period.
13

Page 14

Classification: OFFICIAL#
14

Page 15

Classification: OFFICIAL#
Period Area Target Actual Variance Status FQ2 Commentary
2024/25 FQ2 B&C 0 0 0 Green - Actual
meets Target There were no completions in Bute & Cowal in Q2.
Period Actual FQ1 Commentary
2023/24 FQ2 0
2023/24 FQ3 4
2023/24 FQ4 0
2024/25 FQ1 0
2024/25 FQ2 0
2024/25 FQ2 A&B 26 26 0 Green - Actual
meets Target
There were 26 units completed during this period.
B&C 0    H&L 0    MAKI 20    OLI 6
Period Actual FQ1 Commentary
2023/24 FQ2 40
2023/24 FQ3 4
2023/24 FQ4 0
2024/25 FQ1 12
2024/25 FQ2 26
This indicator for FQ2 meets the target and performance has increased since the last reporting period.
Actual trend line
There were 12 units completed during this period. Dunbritton Housing Associaition – 12 units in Helensburgh 8 x 1 bed and 4
x 2 bed.
B&C 0    H&L 12    MAKI 0    OLI 0
Number of affordable social sector new builds completed per annum
Responsible Person: Kelly Ferns
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ2 meets the target with no change in performance since the last reporting period.
Actual trend line
There were no completions for Bute and Cowal during this period.
Corporate Outcome - Our economy is diverse and thriving
15

Page 16

Classification: OFFICIAL#
There were 12 units completed during this period. Dunbritton Housing Associaition – 12 units in Helensburgh 8 x 1 bed and 4
x 2 bed.
B&C 0    H&L 12    MAKI 0    OLI 0
16

Page 17

Classification: OFFICIAL#
Period Area Target Actual Variance Status FQ2 Commentary
2024/25 FQ2 B&C 75.0% 23.5% -51.5% Red - Actual
below Target
Performance across the Development Management Service continues to be impacted by a backlog of casework. Overall
performance is improving across the Service as availability of staff resource has delivered improved output, however
timeliness measures are adversely impacted as older casework from the backlog is completed. To assist with the
management of customer expectations the target for responding to pre-app enquiries has been temporarily extended to 6
weeks. During FQ2 there has been considerable effort to close older pre-app enquiries which has resulted in a reduction of in
time responses despite good output. During FQ2 23.5% of responses were issued within 6 weeks.
Period Actual FQ1 Commentary
2023/24 FQ2 16.7%
2023/24 FQ3 21.4%
2023/24 FQ4 27.8%
2024/25 FQ1 54.5%
2024/25 FQ2 23.5%
Actual trend line
Performance across the Development Management Service continues to be impacted as it works through a backlog of
casework that has accumulated through the Covid pandemic and which has been exacerbated by extended periods of
operating with reduced staffing levels due to issues with recruitment to vacant posts, and the introduction of National
Planning Framework 4. Whilst vacancies across the service have now largely been filled the focus of officers remains geared
toward the resolution of statutory casework with the handling of pre-application enquiries afforded lower priority in
caseload management. To assist with the management of reduced customer expectations the target for responding to pre-
app enquiries has been temporarily extended to 6 weeks. Performance within the team is now improving. During FQ1, 12 pre-
apps were responded to within B&C. 54.5% were issued within 6 weeks.
Corporate Outcome - Our economy is diverse and thriving
Percentage of pre-planning application enquiries processed within 20 working days
Responsible Person: Peter Bain
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ2 is lower than the target and performance has decreased since the last reporting period.
17

Page 18

Classification: OFFICIAL#
Period Area Target Actual Variance Status FQ2 Commentary
2024/25 FQ2 A&B 75.0% 49.2% -25.8% Red - Actual
below Target
Performance across the Development Management Service continues to be impacted by a backlog of casework. Overall
performance is improving across the Service as availability of staff resource has delivered improved output, however
timeliness measures are adversely impacted as older casework from the backlog is completed. To assist with the
management of customer expectations the target for responding to pre-app enquiries has been temporarily extended to 6
weeks. During FQ2 there has been considerable effort to close older pre-app enquiries which has resulted in a slight
reduction of in time responses despite good output. During FQ2 57.1% of enquiries were responded to within 6 weeks.
Period Actual FQ1 Commentary
2023/24 FQ2 47.5%
2023/24 FQ3 49.1%
2023/24 FQ4 55.0%
2024/25 FQ1 49.5%
2024/25 FQ2 49.2%
Corporate Outcome - Our economy is diverse and thriving
Percentage of pre-planning application enquiries processed within 20 working days
Responsible Person: Peter Bain
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
Actual trend line
Performance across the Development Management Service continues to be impacted as it works through a backlog of
casework that has accumulated through the Covid pandemic and which has been exacerbated by extended periods of
operating with reduced staffing levels due to issues with recruitment to vacant posts, and the introduction of National
Planning Framework 4. Whilst vacancies across the service have now largely been filled the focus of officers remains geared
toward the resolution of statutory casework with the handling of pre-application enquiries afforded lower priority in
caseload management. To assist with the management of reduced customer expectations the target for responding to pre-
app enquiries has been temporarily extended to 6 weeks. During FQ1, 105 pre-apps were responded to across ABC. 57.1%
were issued within 6 weeks.
This indicator for FQ2 is lower than the target and performance has decreased since the last reporting period.
18

Page 19

Classification: OFFICIAL#
Period Area Target Actual Variance Status FQ2 Commentary
2024/25 FQ2 B&C 8.0 43.4 35.4 Red - Actual
exceeds Target
Performance across the Development Management Service continues to be impacted by a significant backlog of casework
although performance is now improving alongside improved staff resource availability. Improved output does however
involve the determination of increasing volumes of older 'legacy' case work. The determination of a higher than normal
volume of older cases has a significant adverse impact on average time reporting measures as a small number of old cases
significantly skew the overall output. FQ2 has seen the determination of 5 legacy items amongst a higher volume of newer
casework. It is highlighted that during FQ2 75% of all householder applications determined were less than 6 months old and
that these were determined within an average timescale of 9.6 weeks.
Period Actual FQ1 Commentary
2023/24 FQ2 28.3
2023/24 FQ3 23.5
2023/24 FQ4 17.2
2024/25 FQ1 11.4
2024/25 FQ2 43.4
Corporate Outcome - Our economy is diverse and thriving
Average number of weeks to determine householder planning applications
Responsible Person: Peter Bain
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ2 exceeds the target and performance has decreased since the last reporting period.
Actual trend line
Performance across the Development Management Service continues to be impacted as it works through a backlog of
casework that has accumulated through the Covid pandemic and which has been exacerbated by extended periods of
operating with reduced staffing levels due to issues with recruitment to vacant posts, and the introduction of National
Planning Framework 4. Improving resource availability has allowed the focus of the DM Service to shift from the
prioritisation of the most significant applications to addressing the accrued backlog of older applications. The determination
of a higher-than-normal volume of older cases has a significant impact on "average time taken" performance measures as a
relatively small number of older cases can skew the outcome. It is also noted that these performance measures are based on
"raw data" and as such have not been adjusted to take into account delays to determination out with the control of the
planning authority. FQ4 has seen the determination of 2 'legacy' applications and continued high volume of newer case work.
Performance overall has improved significantly although it is noted that the determination of older applications continues to
impact on the headline figure however 83% of applications determined in FQ1 were less than 6 months old; these items
were determined in an average time of 9.6 weeks.
19

Page 20

Classification: OFFICIAL#
Period Area Target Actual Variance Status 0
2024/25 FQ2 A&B 8.0 26.1 18.1 Red - Actual
exceeds Target
Performance across the Development Management Service continues to be impacted by a significant backlog of casework
although performance is now improving alongside improved staff resource availability. Improved output does however
involve the determination of increasing volumes of older 'legacy' case work. The determination of a higher than normal
volume of older cases has a significant adverse impact on average time reporting measures as a small number of old cases
significantly skew the overall output. FQ2 has seen the determination of 11 legacy items amongst a higher volume of newer
casework. It is highlighted that during FQ2 75% of all householder applications determined were less than 6 months old and
that these were determined within an average timescale of 9.6 weeks.
Period Actual FQ1 Commentary
2023/24 FQ2 18.1
2023/24 FQ3 16.8
2023/24 FQ4 20.0
2024/25 FQ1 16.1
2024/25 FQ2 26.1
Corporate Outcome - Our economy is diverse and thriving
Average number of weeks to determine householder planning applications
This indicator for FQ2 exceeds the target and performance has decreased since the last reporting period.
Actual trend line
Performance across the Development Management Service continues to be impacted as it works through a backlog of
casework that has accumulated through the Covid pandemic and which has been exacerbated by extended periods of
operating with reduced staffing levels due to issues with recruitment to vacant posts, and the introduction of National
Planning Framework 4. Improving resource availability has allowed the focus of the DM Service to shift from the
prioritisation of the most significant applications to addressing the accrued backlog of older applications. The determination
of a higher-than-normal volume of older cases has a significant impact on "average time taken" performance measures as a
relatively small number of older cases can skew the outcome. It is also noted that these performance measures are based on
"raw data" and as such have not been adjusted to take into account delays to determination out with the control of the
planning authority. FQ4 has seen the determination of 2 'legacy' applications and continued high volume of newer case work.
Performance overall has improved significantly although it is noted that the determination of older applications continues to
impact on the headline figure however 83% of applications determined in FQ1 were less than 6 months old; these items
were determined in an average time of 9.6 weeks.
Responsible Person: Peter Bain
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
20

Page 21

Classification: OFFICIAL#
Period Area Target Actual Variance Status FQ2 Commentary
2024/25 FQ2 A&B No Target 40 N/A N/A
During FQ2, the housing service took 138 homeless applications and provided temporary accommodation for 40 new
homeless households.
B&C: Out of 39 Homeless Applications, 16 new households went in to temporary accommodation (3 x Registered Social
Landlord, 6 x Serviced Accommodation, 7 x Bed & Breakfast).
H&L: Out of 29 Homeless Applications, 4 new households went in to temporary accommodation (3 x Serviced
Accommodation, 1 x Bed & Breakfast).
MAKI: Out of 46 Homeless Applications, 12 new household went in to temporary accommodation (5 x Private Sector Lease, 7
x Bed & Breakfast).
OLI: Out of 24 Homeless Applications, 8 new households went in to temporary accommodation (5 x Supported
Accommodation, 1 x Registered Social Landlord, 1 x Serviced Accommodation, 1 x Bed & Breakfast).
Please note:
• The Registered Social Landlord and Private Rented Sector properties are leased by the Council and sub-let to homeless
households as temporary accommodation.
• Serviced Accommodation is available in Cowal and Helensburgh and is for single people providing an en-suite bedroom and
shared kitchen facilities.
• Supported accommodation is provided in Lorn by Blue Triangle Housing Association.
• Accommodation may be offered outwith the HMA area that the homeless application was taken due to availability i.e.
application taken in Oban and the applicant offered accommodation in Dunoon as there was no accommodation available in
Oban.
Period Actual FQ1 Commentary
2023/24 FQ2 36
2023/24 FQ3 26
2023/24 FQ4 30
2024/25 FQ1 26
2024/25 FQ2 40
Actual trend line
During FQ1, the housing service provided temporary accommodation for 26 new homeless households.
B&C: 10 households (1 x Private Sector Property, 6 x Serviced Accommodation, 3 x Bed & Breakfast).
H&L: 0 new households.
MAKI: 2 household (1 x Bed & Breakfast, 1 x Serviced Accommodation).
OLI: 14 households (1 x Registered Social Landlord, 4 x Private Sector Property, 1 x Serviced Accommodation, 4 x Supported
Accommodation, 4 x Bed & Breakfast).
Please note:
• The Registered Social Landlord and Private Rented Sector properties are leased by the Council and sub-let to homeless
households as temporary accommodation.
• Serviced Accommodation is available in Cowal and Helensburgh and is for single people providing an en-suite bedroom and
shared kitchen facilities.
• Supported accommodation is provided in Lorn by Blue Triangle Housing Association.
• Accommodation may be offered outwith the HMA area that the homeless application was taken due to availability i.e.
application taken in Oban and the applicant offered accommodation in Dunoon as there was no accommodation available in
Oban.
Corporate Outcome - Our economy is diverse and thriving
COI - Number of new homeless applicants who required temporary accommodation this period
Responsible Person: Morven Macintyre
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ2 shows the number of applicants has increased since the last reporting period.
21

Page 22

Classification: OFFICIAL#
Period Area Target Actual Variance Status FQ2 Commentary
2024/25 FQ2 A&B 20.0% 10.5% -9.5% Red - Actual
below Target
From the 49 tender/quick quote contract awards during FQ2, 57 suppliers were successful, 6 of which were local
suppliers. However, only 12 received local bids. The nature of the types of contracts awarded can impact on
submission of local bidders. Of the 12 contracts, 6 were awarded to local suppliers (50.0%) with an estimated
total contract value of £140k.
Period Actual FQ1 Commentary
2023/24 FQ2 26.5%
2023/24 FQ3 27.8%
2023/24 FQ4 14.3%
2024/25 FQ1 36.0%
2024/25 FQ2 10.5%
COI - Maintain the percentage of local suppliers that benefit from the award of contracts via the procurement portal
Responsible Person: Anne MacColl-Smith
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ2 is lower than the target and performance has decreased since the last reporting period.
Actual trend line
FQ1 – 36.0% (an increase from previous quarter 14.3%). From the 24 contracts awarded, 11 local suppliers submitted a bid, 9
of which were successful (81.8%) with an estimated contract value of £10.1m. The Procurement, Commercial and Contract
Management Team will continue to support local suppliers by providing useful information on the Council's website.
Corporate Outcome - Our economy is diverse and thriving
22

Page 23

Classification: OFFICIAL#
Period Area Target Actual Variance Status FQ2 Commentary
2024/25 FQ2 A&B No Target 31 N/A N/A
We have been working closely with our suppliers to deliver additional social, economic and environmental value to our
society. 31 Community Benefits have been achieved through Contract Management, Contract Awards and the Request List
during Q1 & Q2 2024/25.
Period Actual FQ1 Commentary
2023/24 FQ2 37
2023/24 FQ3 -
2023/24 FQ4 37
2024/25 FQ1 -
2024/25 FQ2 31
Actual trend line
The next report will be due in October 2024.
Corporate Outcome - Our economy is diverse and thriving
COI - Increase the number of community benefits that are delivered through contracts we award locally
Responsible Person: Anne MacColl-Smith
This indicator is a Corporate Outcome Indicator that is reported in FQ2 and FQ4. The performance presented is Council-wide only.
This indicator for FQ2 shows the number of community benefits has decreased since the last reporting period.
23

Page 24

Classification: OFFICIAL#
Period Area Target Actual Variance Status FQ2 Commentary
2024/25 FQ2 B&C 75% 100% 25% Green - Actual
exceeds Target
Since the end of last quarter we now have real time access via remote access tablets for our electricians on the ground for
new jobs that come in. It was also summer months meaning the number of faults being logged where low.
Period Actual FQ1 Commentary
2023/24 FQ2 45%
2023/24 FQ3 37%
2023/24 FQ4 90%
2024/25 FQ1 91%
2024/25 FQ2 100%
2024/25 FQ2 A&B 75% 97% 22% Green - Actual
exceeds Target
Overall introducing the new tablets has had a positive impact on the service, our electricians are working more efficently and
effectivly. Summer months also does mean less faults reported by the general public, however that may change in the
upcoming winter months. We also have carried out our capital improvements in the Lorn area, and are in the midst of
carrying out capital improvements on the Isle of Mull.
Period Actual FQ1 Commentary
2023/24 FQ2 43%
2023/24 FQ3 46%
2023/24 FQ4 49%
2024/25 FQ1 93%
2024/25 FQ2 97%
This indicator for FQ2 exceeds the target and performance has increased since the last reporting period.
Actual trend line
Given the summer months, the number of faults reported in FQ1 has reduced, allowing our electricians in all areas to attend
and repair the majority of faults within the timescales set out. We have now fully recruited our team of electricians. We are
in the process of recruiting a Street Lighting Inspector who will oversee all areas and assist our Team Leader on the ground.
Corporate Outcome - We have an infrastructure that supports sustainable growth
Percentage of street lighting faults repaired within 10 days
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ2 exceeds the target and performance has increased since the last reporting period.
Actual trend line
Given the summer months, the number of faults reported in FQ1 has reduced, allowing our electrician in this area to attend
and repair the majority of faults.
24

Page 25

Classification: OFFICIAL#
Given the summer months, the number of faults reported in FQ1 has reduced, allowing our electricians in all areas to attend
and repair the majority of faults within the timescales set out. We have now fully recruited our team of electricians. We are
in the process of recruiting a Street Lighting Inspector who will oversee all areas and assist our Team Leader on the ground.
25

Page 26

Classification: OFFICIAL#
Period Area Target Actual Variance Status FQ2 Commentary
2024/25 FQ2 Bute No Target 0 N/A N/A Again this quarter there were no refuse collection complaints received for the Isle of Bute, an excellent service from the
waste team.
Period Actual FQ1 Commentary
2023/24 FQ2 0
2023/24 FQ3 2
2023/24 FQ4 0
2024/25 FQ1 0
2024/25 FQ2 0
2024/25 FQ2 Cowal No Target 2 N/A N/A There were only 2 waste collection complaints received for the Cowal area for the months of July, August and September. 
Given the number of properties serviced this is very good.
Period Actual FQ1 Commentary
2023/24 FQ2 20
2023/24 FQ3 2
2023/24 FQ4 0
2024/25 FQ1 3
2024/25 FQ2 2
Actual trend line
Cowal received only 3 waste collection complaints this quarter for the months of April, May and June, this is a very good
level of service.
Actual trend line
There were no waste collection complaints this quarter for the Isle of Bute, this is an excellent level of service given the
number of properties serviced.
This indicator for FQ2 shows the number of waste collection complaints has decreased since the last reporting period.
Corporate Outcome - We have an infrastructure that supports sustainable growth
Number of waste collection complaints
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ2 shows the number of waste collection complaints has remained the same since the last reporting period.
26

Page 27

Classification: OFFICIAL#
Cowal received only 3 waste collection complaints this quarter for the months of April, May and June, this is a very good
level of service.
27

Page 28

Classification: OFFICIAL#
Period Area Target Actual Variance Status FQ2 Commentary
2024/25 FQ2 A&B No Target 26 N/A N/A
There were only 26 waste collection complaints received this quarter for the whole of the Argyll and Bute Council area. 
Given the number of properties serviced and the various waste collected over the summer months this is a very good level of
service.
Period Actual FQ1 Commentary
2023/24 FQ2 101
2023/24 FQ3 18
2023/24 FQ4 7
2024/25 FQ1 38
2024/25 FQ2 26
Number of waste collection complaints
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ2 shows the number of waste collection complaints has decreased since the last reporting period.
Actual trend line
A total of 38 waste collection complaints were received this quarter for the whole of Argyll and Bute. This is an excellent
level of service given the number of properties serviced and the various waste collected. Any complaints received are acted
on timeously by the administration staff and waste collection staff.
Corporate Outcome - We have an infrastructure that supports sustainable growth
28

Page 29

Classification: OFFICIAL#
Period Area Target Actual Variance Status FQ2 Commentary
2024/25 FQ2 A&B 45.0% 70.5% 25.5% Green - Actual
exceeds Target
70.5% recycling, composting and recovery (45.2% recycling/composting plus 25.3% recovery). Exceeds target due to
increases in recycling and recovery. For example, a significant amount of over 1000 tonnes of stockpiled rubble at Renewi's
Moleigh Waste and Recycling Facility was processed into materials for hardstanding at the site during the quarter. There was
also slight tonnage increases in recycling of wood, blue bin materials and glass during the quarter. Recovery continues to
improve compared to 2023 with the Helensburgh and Lomond general waste no longer going to landfill and instead going for
refuse derived fuel (RDF)/energy from waste (EFW).
Period Actual FQ1 Commentary
2023/24 FQ2 59.8%
2023/24 FQ3 49.0%
2023/24 FQ4 74.0%
2024/25 FQ1 68.4%
2024/25 FQ2 70.5%
2024/25 FQ2 Renewi No Target 61.3% N/A N/A
61.3% recycling, composting and recovery (44.3% recycling/composting plus 17.0% recovery). Increased recycling during the
quarter mainly due to over 1000 tonnes of stockpiled rubble at Renewi's Moleigh Waste and Recycling Facility being
processed into materials for hardstanding at the site. There was also slight tonnage increase in blue bin recycling during the
quarter.
Period Actual FQ1 Commentary
2023/24 FQ2 68.7%
2023/24 FQ3 55.3%
2023/24 FQ4 66.5%
2024/25 FQ1 56.2%
2024/25 FQ2 61.3%
Actual trend line
56.2% recycling, composting and recovery during the quarter (40.2% recycling/composting plus 16% recovery). Recovery
levels back to normal in this quarter after previous time limited trial by Renewi ended whereby during the trial some general
waste from their sites was sent for energy from waste (EFW).
Actual trend line
68.4% recycling, composting and recovery during the quarter (40.9% recycling/composting plus 27.5% recovery). Figure is
high mainly due to significant recovery from Helensburgh and Lomond’s general waste which now all goes for refuse derived
fuel (RDF)/energy from waste (EFW) instead of being landfilled.
This indicator for FQ2 shows the percentage of waste recycled has increased since the last reporting period.
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - Percentage of waste recycled, composted and recovered
Responsible Person: John Blake
This indicator is reported quarterly. The performance presented is by Council-wide service provision.
This indicator for FQ2 exceeds the target and performance has increased since the last reporting period.
29

Page 30

Classification: OFFICIAL#
56.2% recycling, composting and recovery during the quarter (40.2% recycling/composting plus 16% recovery). Recovery
levels back to normal in this quarter after previous time limited trial by Renewi ended whereby during the trial some general
waste from their sites was sent for energy from waste (EFW).
30

Page 31

Classification: OFFICIAL#
Period Area Target Actual Variance Status 0
2024/25 FQ2 Islands No Target 51.8%% N/A N/A
51.8% recycling, composting and recovery (43.5% recycling/composting plus 8.2% recovery). There was  slight tonnage
increases in recycling of wood, blue bin materials and glass during the quarter. Recovery continues to improve compared to
2023 with the Tiree/Coll general waste no longer going to landfill and instead going for refuse derived fuel (RDF)/energy
from waste (EFW).
Period Actual FQ1 Commentary
2023/24 FQ2 35.6%
2023/24 FQ3 34.2%
2023/24 FQ4 41.5%
2024/25 FQ1 45.8%
2024/25 FQ2 51.8%%
2024/25 FQ2 H&L No Target 100.0% N/A N/A
100% recycling, composting and recovery (48% recycling/composting plus 52% recovery). There was slight tonnage increases
in recycling of wood, blue bin materials and glass during the quarter. Recovery continues to be high compared to 2023 with
the Helensburgh and Lomond general waste no longer going to landfill and instead going for refuse derived fuel
(RDF)/energy from waste (EFW).
Period Actual FQ1 Commentary
2023/24 FQ2 41.6%
2023/24 FQ3 41.5%
2023/24 FQ4 100.0%
2024/25 FQ1 100.0%
2024/25 FQ2 100.0%
Actual trend line
100% recycling, composting and recovery during the quarter (44.9% recycling/composting plus 55.1% recovery). Figure is
high mainly due to significant recovery from Helensburgh and Lomond’s general waste which now all goes for refuse derived
fuel (RDF)/energy from waste (EFW) instead of being landfilled. Recycling and composting was also higher than similar
quarter in FQ1 last year mainly due to increased wood recycling and green garden waste composting from these segregated
waste streams via the Blackhill Recycling and Civic Amenity Site (Helensburgh).
Actual trend line
45.8% recycling, composting and recovery during the quarter (32.8% recycling/composting plus 13% recovery). Increase is
due to more recovery because Tiree/Coll general waste goes to same contractor as Helensburgh and Lomond. The Tiree/Coll
general waste therefore is no longer landfilled and instead goes for refuse derived fuel (RDF)/energy from waste (EFW),
which is classed as recovery.
This indicator for FQ2 shows the percentage of waste recycled has remained the same since the last reporting period.
This indicator for FQ2 shows the percentage of waste recycled has increased since the last reporting period.
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - Percentage of waste recycled, composted and recovered
Responsible Person: John Blake
This indicator is reported quarterly. The performance presented is by Council-wide service provision.
31

Page 32

Classification: OFFICIAL#
100% recycling, composting and recovery during the quarter (44.9% recycling/composting plus 55.1% recovery). Figure is
high mainly due to significant recovery from Helensburgh and Lomond’s general waste which now all goes for refuse derived
fuel (RDF)/energy from waste (EFW) instead of being landfilled. Recycling and composting was also higher than similar
quarter in FQ1 last year mainly due to increased wood recycling and green garden waste composting from these segregated
waste streams via the Blackhill Recycling and Civic Amenity Site (Helensburgh).
32

Page 33

Classification: OFFICIAL#
Period Area Target Actual Variance Status FQ2 Commentary
2024/25 FQ2 A&B 5,850 3,225 -2,625 Green - Actual
below Target
Well within target partly due to increased recycling during the quarter e.g. rubble, wood, glass and blue bin recycling. A
significant factor also is that the Helensburgh and Lomond general waste now goes for refuse derived fuel (RDF)/energy from
waste (EFW) instead of going to landfill (which it was in 2023).
Period Target Actual FQ1 Commentary
2023/24 FQ2 5,550 5,510
2023/24 FQ3 5,100 4,253
2023/24 FQ4 5,000 2,567
2024/25 FQ1 5,850 2,567
2024/25 FQ2 5,550 3,225
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - Number of tonnes of waste sent to landfill
Responsible Person: John Blake
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ2 is lower than the target (lowest is best).
Actual trend line
Biodegradable municipal waste to landfill figure is well within target mainly due to significant recovery from Helensburgh
and Lomond’s general waste which now all goes for refuse derived fuel (RDF)/energy from waste (EFW) instead of being
landfilled. New waste disposal contractors have been appointed to deal with the general waste from the Helensburgh and
Lomond area following the closure of Barr Environmental operations.
33

Page 34

Classification: OFFICIAL#
Period Area Target Actual Variance Status FQ2 Commentary
2024/25 FQ2 Bute 73 80 7 Green - Actual
exceeds Target
Again this quarter the street cleansing figure for the Isle of Bute remains high at 80, exceeding both the national standard
and benchmark figure.
Period Actual FQ1 Commentary
2023/24 FQ2 76
2023/24 FQ3 80
2023/24 FQ4 81
2024/25 FQ1 81
2024/25 FQ2 80
2024/25 FQ2 Cowal 73 78 5 Green - Actual
exceeds Target Again this quarter the street cleansing figure for the Cowal area remains good at 78.
Period Actual FQ1 Commentary
2023/24 FQ2 77
2023/24 FQ3 77
2023/24 FQ4 76
2024/25 FQ1 75
2024/25 FQ2 78
Actual trend line
Cowal is showing a LEAMS figure of 75 this quarter, remaining steady over the past year. A good level of street cleanliness.
Actual trend line
The street cleanliness in Bute remains high with a LEAMS figure of 81.
This indicator for FQ2 exceeds the target and performance has increased since the last reporting period.
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - LEAMS (Local Environment Audit and Management System)
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ2 exceeds the target however performance has decreased since the last reporting period.
34

Page 35

Classification: OFFICIAL#
Cowal is showing a LEAMS figure of 75 this quarter, remaining steady over the past year. A good level of street cleanliness.
35

Page 36

Classification: OFFICIAL#
Period Area Target Actual Variance Status FQ2 Commentary
2024/25 FQ2 A&B 73 85 12 Green - Actual
exceeds Target
For the months of July, August and September the overall figure for street cleanliness within Argyll and Bute is sitting at 85,
this is a very good level of service provided by the teams on both the mainland and the Islands.
Period Actual FQ1 Commentary
2023/24 FQ2 83
2023/24 FQ3 85
2023/24 FQ4 83
2024/25 FQ1 84
2024/25 FQ2 85
Actual trend line
All areas in Argyll and Bute have again this quarter well exceeded the target LEAMS figure, showing a very good level of
street cleanliness.
This indicator for FQ2 exceeds the target and performance has increased since the last reporting period.
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - LEAMS (Local Environment Audit and Management System)
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
36

Page 37

Classification: OFFICIAL#
Period Area Target Actual Variance Status FQ2 Commentary
2024/25 FQ2 B&C No Target 2.09 N/A N/A Work days lost has increased by 0.09 of a day on the same quarter last year and has decreased by 0.86 of a day from the
previous quarter.  Main work days lost have been due to long term Medical Treatment related reasons.
Period Actual FQ1 Commentary
2023/24 FQ2 2.00
2023/24 FQ3 3.72
2023/24 FQ4 4.00
2024/25 FQ1 2.95
2024/25 FQ2 2.09
2024/25 FQ2 A&B No Target 1.77 N/A N/A Work days lost has increased by 0.52 of a day on the same quarter last year and has decreased by 0.37 of a day from the
previous quarter.  Main work days lost have been due to Mental Health related reasons.
Period Actual FQ1 Commentary
2023/24 FQ2 1.25
2023/24 FQ3 2.82
2023/24 FQ4 2.82
2024/25 FQ1 2.14
2024/25 FQ2 1.77
This indicator for FQ2 shows the number of sickness absence days has decreased since the last reporting period.
Actual trend line
Work days lost has remained almost the same as the same quarter last year. It has decreased by 0.68 days on the same
quarter last year. Most work days have been lost due to Mental Health related absence reasons.
Corporate Outcome - Making it happen
COI - Teacher sickness absence
Responsible Person: Jennifer Crocket (B&C and MAKI) / Wendy Brownlie (H&L and OLI)
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ2 shows the number of sickness absence days has decreased since the last reporting period.
Actual trend line
Work days lost has decreased by 0.69 of a day on the same quarter last year. It has also decreased by 1.05 day from FQ4.
Most work days lost have been due to Mental Health related reasons.
37

Page 38

Classification: OFFICIAL#
Work days lost has remained almost the same as the same quarter last year. It has decreased by 0.68 days on the same
quarter last year. Most work days have been lost due to Mental Health related absence reasons.
38

Page 39

Classification: OFFICIAL#
Period Area Target Actual Variance Status FQ2 Commentary
2024/25 FQ2 B&C No Target 3.87 N/A N/A Work days lost has increased by 0.37 of a day on the same quarter last year and has decreased by 0.66 of a day from the
previous quarter.  Main work days lost have been due to Mental Health related reasons.
Period Actual FQ1 Commentary
2023/24 FQ2 3.50
2023/24 FQ3 4.42
2023/24 FQ4 4.64
2024/25 FQ1 4.53
2024/25 FQ2 3.87
2024/25 FQ2 A&B No Target 3.43 N/A N/A Work days lost has increased by 0.25 of a day on the same quarter last year and has decreased by 0.42 of a day from the
previous quarter.  Main work days lost have been due to Mental Health related reasons.
Period Actual FQ1 Commentary
2023/24 FQ2 3.18
2023/24 FQ3 3.73
2023/24 FQ4 4.12
2024/25 FQ1 3.85
2024/25 FQ2 3.43
Actual trend line
There has been an increase of 0.32 days absence on the same quarter last year. There has been a decrease of 0.27 days on
the last quarter. Most work days lost have been due to Mental Health related reasons.
This indicator for FQ2 shows the number of sickness absence days has decreased since the last reporting period.
Actual trend line
Work days lost has stayed about the same as the same quarter last year. It has decreased slightly on the last quarter. Mental
health related absences account for the largest number of work days lost.
Corporate Outcome - Making it happen
COI - LGE staff (including non-Teacher) sickness absence
Responsible Person: Carolyn Cairns
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ2 shows the number of sickness absence days has decreased since the last reporting period.
39

Page 40

Classification: OFFICIAL#
There has been an increase of 0.32 days absence on the same quarter last year. There has been a decrease of 0.27 days on
the last quarter. Most work days lost have been due to Mental Health related reasons.
40

Page 41

Classification: OFFICIAL#
Period Area Target Actual Variance Status FQ2 Commentary
2024/25 FQ2 A&B 70.0% 72.7% 2.7% Green - Actual
exceeds Target
In FQ2 there were 39,421 customer transactions dealt with by Customer Service Agents (27.3%) and 104,776
were automated or self-service transactions (72.7%) so the 70.0% target was bettered. 
Period Actual FQ1 Commentary
2023/24 FQ2 72.1%
2023/24 FQ3 72.7%
2023/24 FQ4 70.1%
2024/25 FQ1 71.6%
2024/25 FQ2 72.7%
Corporate Outcome - Making it happen
COI - Increase the percentage of all self-service automated contacts
Responsible Person: Robert Miller
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ2 exceeds the target and performance has increased since the last reporting period.
Actual trend line
In FQ1 there was 41,574 transactions dealt with by Customer Service Agents (28.4%) and 105,051 automated or self-service
transactions (71.6%) so the 70.0% target was exceeded.
41