FQ3 2024-25 B&C Area Performance Report.

Argyll and Bute Council · 4 March 2025
Back to Bute and Cowal Area Committee — 4 March 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

#
Indicator Responsible Person Reported Page
COI - Maximise distribution of Scottish Welfare Fund Fergus Walker A&B only 3
COI - Percentage of clients satisfied that they are better able to deal with their financial problems following
our support and intervention Lee Roberts A&B only 4
Number of parking penalty notices issued Hugh O'Neill Area 5
Car parking income to date (cumulative) Hugh O'Neill Area 6 - 7
Number of dog fouling complaints Tom Murphy Area 8
COI - Increase the percentage of our care experienced young people that have the recommended additional
tracking and monitoring plans in place Louise Chisholm A&B only 9
COI - Provide quality meals within cost margins to all pupils Christine Boyle A&B only 10
Maximise the percentage of 16-19 year olds participating in education, training or employment Jennifer Crocket Area 11
2024/25 FQ3 Bute and Cowal Performance Report
The information presented is a summary of the agreed measures.
Unless stated otherwise, performance is presented at both Area and Council-wide levels.
The measure shows the performance against target for the current previous three reporting periods with an explanation of performance trend.
Where appropriate a trend line has been added to illustrate movement in 'Actual' over the reporting period.
Corporate Outcome: People live active, healthier and happier lives
Corporate Outcome: People live in safer and stronger communities
Corporate Outcome: Children and young people have the best possible start
Corporate Outcome: Education, skills and training maximises opportunities for all

Page 2

#
Indicator Responsible Person Reported Page
Number of affordable social sector new builds completed per annum Kelly Ferns Area 12
Percentage of pre-planning application enquiries processed within 20 working days Peter Bain Area 13 - 14
Average number of weeks to determine householder planning applications Peter Bain Area 15 - 16
COI - Number of new homeless applicants who required temporary accommodation this period Morven Macintyre A&B only 17
COI - Maintain the percentage of local suppliers that benefit from the award of contracts via the procurement
portal Anne MacColl-Smith A&B only 18
COI - Increase the number of community benefits that are delivered through contracts we award locally Anne MacColl-Smith A&B only 19
Percentage of street lighting faults repaired within 10 days Tom Murphy Area 20
Number of waste collection complaints Tom Murphy Area 21 - 22
COI (part) - Percentage of waste recycled, composted and recovered John Blake Area 23 - 24
COI - Number of tonnes of waste sent to landfill John Blake A&B only 25
COI - LEAMS (Local Environment Audit and Management System) Tom Murphy Area 26 - 27
COI - Teacher sickness absence Jennifer Crocket (B&C and MAKI)
Wendy Brownlie (H&L and OLI) Area 28
COI - LGE staff (including non-Teacher) sickness absence Carolyn Cairns Area 29
COI - Increase the percentage of all self-service automated contacts Robert Miller A&B only 30
Corporate Outcome: We have an infrastructure that supports sustainable growth
Corporate Outcome: Making it happen
Corporate Outcome: Our economy is diverse and thriving

Page 3

#
Period Area Target Actual Variance Status FQ3 Commentary
2024/25 FQ3 A&B 95.3% 79.7% -15.6% Red - Actual
below Target
As at 31 December 2024 , our expenditure stands at £423,302.  This represents an underspend of £107,914 of our budgeted
profiled amount.  To date the number of applications is down by 10% compared to the same period last year, however the
average award amount has increased by almost £50.  As in previous years we expect an increase in both applications and
awards in the final quarter of this year.
Period Actual FQ2 Commentary
2023/24 FQ3 138.2%
2023/24 FQ4 128.6%
2024/25 FQ1 94.0%
2024/25 FQ2 72.9%
2024/25 FQ3 79.7%
Corporate Outcome - People live active, healthier and happier lives
COI - Maximise distribution of Scottish Welfare Fund
Responsible Person: Fergus Walker
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ3 is lower than the target however performance has increased since the last reporting period.
Actual trend line
As of 30 September 2024, our expenditure stands at £258,079. However as our confirmed budget allocation has increased to
£708,284 which includes £458,284 from the Scottish Government programme fund and £250,000 provided by the Council to
address cost pressures.  Therefore this represents an underspend of £96,065 to date. The number of applications to the fund
is down by 11% in this quarter, however the average amount of award is higher compared to last year. As the next 6 months
can be the most challenging for our vulnerable claimants we expect increases in both applications and spend going forward.
3

Page 4

Period Area Target Actual Variance Status FQ3 Commentary
2024/25 FQ3 A&B 100% 100% 0% Green - Actual
meets Target
This is a voluntary survey with no obligation for clients to respond either in full or in part. It is also common for incomplete
returns to be received. In FQ3 2024/25, 17 survey forms were distributed to clients. 9 were returned. Of these 9 returns, 8
responded to the question relating to being better able to deal with their financial problems. Of these 8 respondents, 8
responded positively, whilst 0 responded negatively. Accordingly, 100% of clients that responded were positive about their
experience i.e. no negative comments or responses were reported.
Period Actual FQ2 Commentary
2023/24 FQ3 100%
2023/24 FQ4 100%
2024/25 FQ1 100%
2024/25 FQ2 100%
2024/25 FQ3 100%
Actual trend line
This is a voluntary survey with no obligation for clients to respond either in full or in part. It is also common for incomplete
returns to be received. In FQ2 2024/25, 14 survey forms were distributed to clients. 4 were returned. Of these 4 returns, 4
responded to the question relating to being better able to deal with their financial problems. Of these 4 respondents, 4
responded positively, whilst 0 responded negatively. Accordingly, 100% of clients that responded were positive about their
experience i.e. no negative comments or responses were reported.
Corporate Outcome - People live active, healthier and happier lives
COI - Percentage of clients satisfied that they are better able to deal with their financial problems following our support and intervention
Responsible Person: Lee Roberts
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ3 meets the target with no change in performance since the last reporting period.
4

Page 5

Period Area Target Actual Variance Status FQ3 Commentary
2024/25 FQ3 B&C No Target 245 N/A N/A Increase from last quarter and up compared to previous year FQ3.  The "off-season" has allowed the B&C warden to focus
locally.
Period Actual FQ2 Commentary
2023/24 FQ3 226
2023/24 FQ4 214
2024/25 FQ1 251
2024/25 FQ2 195
2024/25 FQ3 245
2024/25 FQ3 A&B No Target 968 N/A N/A Decrease on previous FQ3 but within general range.
Period Actual FQ2 Commentary
2023/24 FQ3 1,015
2023/24 FQ4 1,196
2024/25 FQ1 1,763
2024/25 FQ2 2,302
2024/25 FQ3 968
Corporate Outcome - People live in safer and stronger communities
Number of parking penalty notices issued
Responsible Person: Hugh O'Neill
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ3 shows the number of parking penalty notices has increased since the last reporting period.
Actual trend line
There has been a decrease in PCNs issued for the Bute and Cowal area as the warden has been covering the Luss area in line
with the new Traffic Regulation order.
This indicator for FQ3 shows the number of parking penalty notices has decreased since the last reporting period.
Actual trend line
There is a substantial increase since last year's FQ2, this is mainly due to the extra patrols in the Luss area on the back of the
Traffic Regulation order being progressed and enforced as per the wishes of local Luss Village residents.
5

Page 6

Period Area Target Actual Variance Status FQ3 Commentary
2024/25 FQ3 B&C £18,372 £12,383 -£5,989 Red - Actual
below Target
The poor weather during FQ3 may have impacted vistor numbers.  The waiving of charges for winter festivals and the free
parking over the festive period may have had a detrimental impact on income.
Period Target Actual FQ2 Commentary
2023/24 FQ3 £71,239 £48,303
2023/24 FQ4 £86,511 £64,271
2024/25 FQ1 £17,135 £7,755
2024/25 FQ2 £20,132 £27,788
2024/25 FQ3 £18,372 £12,383
£2,017
£0
£348
£1,402
£3,168
£1,918
£3,530
£0
£12,383
Corporate Outcome - People live in safer and stronger communities
Car parking income to date (cumulative)
Responsible Person: Hugh O'Neill
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ3 shows the cumulative amount of income is lower than the cumulative target.
Dunoon Pier
Moir Street,Dunoon
Argyll Street, Dunoon
Jane Villa, Dunoon
B&C
Total
Actual trend line
There is no trend as this data is
cumulative as of FQ1 each financial year.
Despite the relatively poor summer weather, B&C Parking income has seen an increase in budget recovery, this may well be
due to an increased presence by the local warden in Dunoon coupled with a possible rise in visitor numbers.
Income Collected During FQ3
Guildford Square, Rothesay
Church Street, Dunoon
Swimming Pool, Dunoon
6

Page 7

Period Area Target Actual Variance Status FQ3 Commentary
2024/25 FQ3 A&B £237,910 £248,502 £10,592 Green - Actual
exceeds Target An increase in income but generally on track with targets.
Period Target Actual FQ2 Commentary
2023/24 FQ3 £797,331 £807,348
2023/24 FQ4 £968,262 £937,090
2024/25 FQ1 £289,219 £247,216
2024/25 FQ2 £373,922 £391,990
2024/25 FQ3 £237,910 £248,502
This indicator for FQ3 shows the cumulative amount of income has exceeded the cumulative target.
Actual trend line
There is no trend as this data is
cumulative as of FQ1 each financial year.
Events in Oban, the new TRO in Luss as well as a full time warden in Dunoon has most likely been the source of extra income
coming through our parking areas.
Corporate Outcome - People live in safer and stronger communities
Car parking income to date (cumulative)
Responsible Person: Hugh O'Neill
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
7

Page 8

Period Area Target Actual Variance Status FQ3 Commentary
2024/25 FQ3 B&C No Target 22 N/A N/A There has been a rise in the number of dog fouling complaints this quarter in the Bute and Cowal area, with Bute receiving 8
complaints and Cowal receiving 14.
Period Actual FQ2 Commentary
2023/24 FQ3 14
2023/24 FQ4 19
2024/25 FQ1 12
2024/25 FQ2 12
2024/25 FQ3 22
2024/25 FQ3 A&B No Target 65 N/A N/A
A total of 65 dog fouling complaints were received for the whole of Argyll and Bute this quarter.  This may seem high,
however it has been found that dog fouling can be seasonal with spikes in dark nights and dark mornings with a lot of dog
walkers refraining from walking their dogs off the beaten tracks in the winter months.  The warden service will continue to
monitor as and when time allows.
Period Actual FQ2 Commentary
2023/24 FQ3 46
2023/24 FQ4 65
2024/25 FQ1 57
2024/25 FQ2 33
2024/25 FQ3 65
Corporate Outcome - People live in safer and stronger communities
Number of dog fouling complaints
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ3 shows the number of dog fouling complaints has increased since the last reporting period.
This indicator for 0 shows the number of dog fouling complaints has increased since the last reporting period.
Actual trend line
This quarter has seen the number of dog fouling complaints reduce significantly to 33 throughout the whole Argyll and Bute
Council area, this is very good and is partyly down to the presence of the Warden Service.  In August the service recruited
another Amenity Warden who will cover the Mid Argyll, Kintyre and Islay areas.
Actual trend line
For the Bute and Cowal area the total number of dog fouling complaints received this quarter was 12.  Bute received 9 and
Cowal 3. 
8

Page 9

Period Area Target Actual Variance Status FQ3 Commentary
2024/25 FQ3 A&B 100% 100% 0% Green - Actual
meets Target
Each care experienced child and young person (CECYP) enrolled in an authority school has tracking and monitoring plans in
place via our education management information system known as Seemis.  Data collated includes attendance, exclusion,
progress and attainment and wellbeing information.  We are continouosly working alongside schools and partner agencies to
ensure the CE status is accurately reflected.  Enhanced reporting and scrutinising of data, alongside greater awarness of our
CECYP, has led to earlier and positive intervention.  This is evidenced through our attainment data which shows a reduced
learning gap between CE and non-CE learners since 2021 -22 (with both cohorts showing increased attainment).  We continue
to work with partner agencies to support cross authority tracking and monitoring to support CECYP hosted out with Argyll and
Bute.
Period Actual FQ2 Commentary
2023/24 FQ3 100%
2023/24 FQ4 100%
2024/25 FQ1 100%
2024/25 FQ2 100%
2024/25 FQ3 100%
Actual trend line
Each care experienced child and young person enrolled in an authority school has tracking and monitoring plans in place via
our education management information system knowns as Seemis. Data collated includes attendance, exclusion, progress and
attainment and wellbeing information. The Virtual Head Teacher (VHT) for Care Experienced Children and Young People
(CECYP) works closely with the education team and receives monthly reports specific to CECYP. The VHT has focussed
attainment meets with Designated Managers for CECYP across authoriy settings. Our tacking and monitoring data is
scrutinised during these meets to ensure each young person has the correct framework of support to help them achieve
success. Our 2023 - 24 data (still embargoed to quality assurace process) evidences the positive impact of this enhaced level of
scrutiny, support and challenge. The profile of our CECYP continues to be raised through system improvements, training
opportunities, information sharing (as appropriate) leading to greater consideration of personalised support at all stages of
the young peron's educational journey. Feedback evidences that wider school staff have increased awareness of the needs of
our CECYP cohort. We are able to work with Virtual Head Teachers from Scottish wide local authorities to develop a data
sharing agreeemnt to support cross authority tracking and monitoring to support CECYP hosted out with Argylll and Bute.
Corporate Outcome - Children and young people have the best possible start
COI - Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring plans in place
Responsible Person: Louise Lawson
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ3 meets the target with no change in performance since the last reporting period.
9

Page 10

Period Area Target Actual Variance Status FQ3 Commentary
2024/25 FQ3 A&B +/-5.00% 0% 5% Green - Actual
exceeds Target
We continue to monitor schools that are not achieving the +/- 5% target.
B&C 6.21, H&L -3.88%, MAKI -4.58%, OLI 1.68%
Period Actual FQ2 Commentary
2023/24 FQ3 4.12%
2023/24 FQ4 -3.44%
2024/25 FQ1 0.48%
2024/25 FQ2 -1.37%
2024/25 FQ2 0.14%
Corporate Outcome - Children and young people have the best possible start
COI - Provide quality meals within cost margins to all pupiles
Responsible Person: Christine Boyle
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ3 within the +/5.00% variance and performance has increased since the last reporting period.
Actual trend line
We continue to monitor schools that are not achieving the +/- 5% target.
B&C -5.65%, H&L -5.52%, MAKI 6.55%, OLI 3.26
10

Page 11

Period Area Target Actual Variance Status FQ3 Commentary
2024/25 FQ3 B&C 94.00% 92.95% -1.05% Red - Actual
below Target
As of 3rd February 2025 the participation figure (16–19-year-olds in employment, training or education) in Bute and Cowal
was 870 young people, which equates to 92.95%. This is 1.05% below the target and 1.35% below the annual Argyll and Bute
participation figure of 94.3% which was released by Skills Development Scotland at the end of August 2024. The participation
figure of 92.95% for FQ3 of 2024/25 is a decrease of 2.21% on the participation figure for FQ2 of 2024/25.
Period Actual FQ2 Commentary
2023/24 FQ3 92.97%
2023/24 FQ4 91.16%
2024/25 FQ1 93.56%
2024/25 FQ2 95.16%
2024/25 FQ3 92.95%
2024/25 FQ3 A&B 94.00% 94.19% 0.19% Green - Actual
exceeds Target
As of 3rd February 2025 the participation figure (16–19-year-olds in employment, training or education) across the whole of
Argyll and Bute was 3921 young people, which equates to 94.19%. This is 0.19% above the target and 0.11% below the annual
Argyll and Bute participation figure of 94.3% which was released by Skills Development Scotland at the end of August 2024.
The participation figure of 94.19% for FQ3 of 2024/25 is a decrease of 1.61% on the participation figure for FQ2 of 2024/25.
Period Actual FQ2 Commentary
2023/24 FQ3 94.37%
2023/24 FQ4 93.59%
2024/25 FQ1 94.99%
2024/25 FQ2 95.80%
2024/25 FQ3 94.19%
Corporate Outcome - Our economy is diverse and thriving
Maximise the percentage of 16-19 year olds participating in education, training or employment
Responsible Person: Jennifer Crocket
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ3 is lower than the target and performance has decreased since the last reporting period.
Actual trend line
As of 10th October 2024, the participation figure (16-19 year-olds in employment, training or education) for the whole of
Argyll and Bute was 4,174 young people, which equates to 95.80%. This is 1.80% above the target and 1.50% above the annual
Argyll and Bute participation figure of 94.30% which was released by Skills Development Scotland at the end of August 2024.
The participation figure of 95.80% for FQ2 of 2024/25 is an increase of 0.81% on the participation figure for FQ1 of 2024/25.
This indicator for FQ3 exceeds the target however performance has decreased since the last reporting period.
Actual trend line
As of 10th October 2024 the participation figure (16–19-year-olds in employment, training or education) in Bute and Cowal
was 924 young people, which equates to 95.16%. This is 1.16% above the target and 0.86% above the annual Argyll and Bute
participation figure of 94.3% which was released by Skills Development Scotland at the end of August 2024. The participation
figure of 95.16% for FQ2 of 2024/25 is an increase of 1.60% on the participation figure for FQ1 of 2024/25.
11

Page 12

Period Area Target Actual Variance Status FQ3 Commentary
2024/25 FQ3 B&C 0 0 0 Green - Actual
meets Target There were no completions in B&C in FQ3.
Period Actual FQ2 Commentary
2023/24 FQ3 4
2023/24 FQ4 0
2024/25 FQ1 0
2024/25 FQ2 0
2024/25 FQ3 0
2024/25 FQ3 A&B 6 6 0 Green - Actual
meets Target Fyne Homes completed 6 x 3 bed general needs properties at Baddens, Lochgilphead in FQ3
Period Actual FQ2 Commentary
2023/24 FQ3 4
2023/24 FQ4 0
2024/25 FQ1 12
2024/25 FQ2 26
2024/25 FQ3 6
Corporate Outcome - Our economy is diverse and thriving
This indicator for FQ3 meets the target however performance has decreased since the last reporting period.
Actual trend line
There were 26 units completed during this period.
B&C 0    H&L 0    MAKI 20    OLI 6
Number of affordable social sector new builds completed per annum
Responsible Person: Kelly Ferns
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ3 meets the target with no change in performance since the last reporting period.
Actual trend line
There were no completions in Bute & Cowal in Q2.
12

Page 13

Period Area Target Actual Variance Status FQ3 Commentary
2024/25 FQ3 B&C 75.0% 22.7% -52.3% Red - Actual
below Target
Performance across the Development Management Service is still being recovered and impacted upon by the management of
a significant backlog of casework. Overall output and performance across the Service is improving as staff resource issues have
been resolved, however timeliness measures continue to be adversely impacted through the prioritisation of older statutory
'legacy' casework for determination. In order to assist with managing customer expectations the target response period has
been temporarily extended to 6 weeks. There continues to be a backlog of pre-application enquiries within the BCHL team
which is impacting upon performance although many of the open enquiries are in fact progressing with ongoing dialogue. 
During FQ3 the BCHL team's pre-app volume throughout increased, with a 118% turnover reported. Working through a
backlog of pre-apps inevitably means that the overall percentage turned around in 20 working days will be impacted. Of the
23 pre-apps closed, 18  were from the backlog of cases.
Period Actual FQ2 Commentary
2023/24 FQ3 21.4%
2023/24 FQ4 27.8%
2024/25 FQ1 54.5%
2024/25 FQ2 23.5%
2024/25 FQ3 22.7%
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ3 is lower than the target and performance has decreased since the last reporting period.
Actual trend line
Performance across the Development Management Service continues to be impacted by a backlog of casework. Overall
performance is improving across the Service as availability of staff resource has delivered improved output, however
timeliness measures are adversely impacted as older casework from the backlog is completed. To assist with the management
of customer expectations the target for responding to pre-app enquiries has been temporarily extended to 6 weeks. During
FQ2 there has been considerable effort to close older pre-app enquiries which has resulted in a reduction of in time responses
despite good output. During FQ2 23.5% of responses were issued within 6 weeks.
Corporate Outcome - Our economy is diverse and thriving
Percentage of pre-planning application enquiries processed within 20 working days
Responsible Person: Peter Bain
13

Page 14

Period Area Target Actual Variance Status FQ3 Commentary
2024/25 FQ3 A&B 75.0% 48.3% -26.7% Red - Actual
below Target
Performance across the Development Management Service is still being recovered and impacted upon by the management of
a significant backlog of casework. Overall output and performance across the Service is improving as staff resource issues have
been resolved, however timeliness measures continue to be adversely impacted through the prioritisation of older statutory
'legacy' casework for determination. In order to assist with managing customer expectations the target response period has
been temporarily extended to 6 weeks. There continues to be a backlog of pre-application enquiries within the BCHL team
which is impacting upon overall Service performance although many of the open enquiries are in fact progressing with
ongoing dialogue. During FQ3 123 pre-apps were closed aross ABC.
Please find links below for supplementary information on performance in this area:
PPSL Committee - Development Management Performance Update: https://www.argyll-
bute.gov.uk/moderngov/documents/s215679/DM%20Performance%20Update%202024-25%20FQ3%20PB%2010.01.2025.pdf
Appendix 1: https://www.argyll-
bute.gov.uk/moderngov/documents/s215680/Appendix%201%20DM%20Performance%20Update%20FQ3%202425.pdf
Period Actual FQ2 Commentary
2023/24 FQ3 49.1%
2023/24 FQ4 55.0%
2024/25 FQ1 49.5%
2024/25 FQ2 49.2%
2024/25 FQ3 48.3%
Corporate Outcome - Our economy is diverse and thriving
Percentage of pre-planning application enquiries processed within 20 working days
Responsible Person: Peter Bain
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
Actual trend line
Performance across the Development Management Service continues to be impacted by a backlog of casework. Overall
performance is improving across the Service as availability of staff resource has delivered improved output, however
timeliness measures are adversely impacted as older casework from the backlog is completed. To assist with the management
of customer expectations the target for responding to pre-app enquiries has been temporarily extended to 6 weeks. During
FQ2 there has been considerable effort to close older pre-app enquiries which has resulted in a slight reduction of in time
responses despite good output. During FQ2 57.1% of enquiries were responded to within 6 weeks.
This indicator for FQ3 is lower than the target and performance has decreased since the last reporting period.
14

Page 15

Period Area Target Actual Variance Status FQ3 Commentary
2024/25 FQ3 B&C 8.0 16.3 8.3 Red - Actual
exceeds Target
Performance across the Development Management Service has been impacted by a significant backlog of casework. Whilst
issues relating to staff resource availability have been resolved and output has significantly improved it is highlighted that
KPI's measuring average time taken are adversely affected by the resolution of increasing volumes of 'legacy' casework which
significantly skew reporting, particularly at area level where this relates to a small number of applications. During FQ3 6
'householder' applications were determined in B&C; these included 1 'legacy' item. Excluding this 'legacy' item the average
time taken to determine the other 5 applications was 10.8 weeks.
Period Actual FQ2 Commentary
2023/24 FQ3 23.5
2023/24 FQ4 17.2
2024/25 FQ1 11.4
2024/25 FQ2 43.4
2024/25 FQ3 16.3
Corporate Outcome - Our economy is diverse and thriving
Average number of weeks to determine householder planning applications
Responsible Person: Peter Bain
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ3 exceeds the target however performance has increased since the last reporting period.
Actual trend line
Performance across the Development Management Service continues to be impacted by a significant backlog of casework
although performance is now improving alongside improved staff resource availability. Improved output does however involve
the determination of increasing volumes of older 'legacy' case work. The determination of a higher than normal volume of
older cases has a significant adverse impact on average time reporting measures as a small number of old cases significantly
skew the overall output. FQ2 has seen the determination of 5 legacy items amongst a higher volume of newer casework. It is
highlighted that during FQ2 75% of all householder applications determined were less than 6 months old and that these were
determined within an average timescale of 9.6 weeks.
15

Page 16

Period Area Target Actual Variance Status 0
2024/25 FQ3 A&B 8.0 15.9 7.9 Red - Actual
exceeds Target
Performance across the Development Management Service has been impacted by a significant backlog of casework. Whilst
issues relating to staff resource availability have been resolved and output has significantly improved it is highlighted that
KPI's measuring average time taken are adversely affected by the resolution of increasing volumes of 'legacy' casework which
significantly skew reporting, particularly at area level where this relates to a small number of applications. During FQ3 60
'householder' applications were determined across all of ABC; these included 7 'legacy' items. Excluding the'legacy' items the
average time taken to determine the other 53 applications was 10.2 weeks.
Please find links below for supplementary information on performance in this area:
PPSL Committee - Development Management Performance Update: https://www.argyll-
bute.gov.uk/moderngov/documents/s215679/DM%20Performance%20Update%202024-25%20FQ3%20PB%2010.01.2025.pdf
Appendix 1: https://www.argyll-
bute.gov.uk/moderngov/documents/s215680/Appendix%201%20DM%20Performance%20Update%20FQ3%202425.pdf
Period Actual FQ2 Commentary
2023/24 FQ3 16.8
2023/24 FQ4 20.0
2024/25 FQ1 16.1
2024/25 FQ2 26.1
2024/25 FQ3 15.9
Responsible Person: Peter Bain
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ3 exceeds the target however performance has increased since the last reporting period.
Actual trend line
Performance across the Development Management Service continues to be impacted by a significant backlog of casework
although performance is now improving alongside improved staff resource availability. Improved output does however involve
the determination of increasing volumes of older 'legacy' case work. The determination of a higher than normal volume of
older cases has a significant adverse impact on average time reporting measures as a small number of old cases significantly
skew the overall output. FQ2 has seen the determination of 11 legacy items amongst a higher volume of newer casework. It is
highlighted that during FQ2 75% of all householder applications determined were less than 6 months old and that these were
determined within an average timescale of 9.6 weeks.
Corporate Outcome - Our economy is diverse and thriving
Average number of weeks to determine householder planning applications
16

Page 17

Period Area Target Actual Variance Status FQ3 Commentary
2024/25 FQ3 A&B No Target 27 N/A N/A
During FQ3, the housing service took 90 homeless applications and provided temporary accommodation for 27 new homeless
households.
B&C: Out of 25 Homeless Applications, 8 new households went in to temporary accommodation (4 x Serviced
Accommodation, 4 x Bed & Breakfast).
H&L: Out of 22 Homeless Applications, 8 new households went in to temporary accommodation (4 x Serviced
Accommodation, 2 x Bed & Breakfast, 1 x Private Sector Lease, 1 x Council Retained).
MAKI: Out of 23 Homeless Applications, 7 new household went in to temporary accommodation (3 x Private Sector Lease, 4 x
Bed & Breakfast).
OLI: Out of 20 Homeless Applications, 4 new households went in to temporary accommodation (3 x Supported
Accommodation, 1 x Serviced Accommodation).
Period Actual FQ2 Commentary
2023/24 FQ3 26
2023/24 FQ4 30
2024/25 FQ1 26
2024/25 FQ2 40
2024/25 FQ3 27
Corporate Outcome - Our economy is diverse and thriving
COI - Number of new homeless applicants who required temporary accommodation this period
Responsible Person: Morven Macintyre
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ3 shows the number of applicants has decreased since the last reporting period.
Actual trend line
During FQ2, the housing service took 138 homeless applications and provided temporary accommodation for 40 new
homeless households.
B&C: Out of 39 Homeless Applications, 16 new households went in to temporary accommodation (3 x Registered Social
Landlord, 6 x Serviced Accommodation, 7 x Bed & Breakfast).
H&L: Out of 29 Homeless Applications, 4 new households went in to temporary accommodation (3 x Serviced
Accommodation, 1 x Bed & Breakfast).
MAKI: Out of 46 Homeless Applications, 12 new household went in to temporary accommodation (5 x Private Sector Lease, 7 x
Bed & Breakfast).
OLI: Out of 24 Homeless Applications, 8 new households went in to temporary accommodation (5 x Supported
Accommodation, 1 x Registered Social Landlord, 1 x Serviced Accommodation, 1 x Bed & Breakfast).
Please note:
•  The Registered Social Landlord and Private Rented Sector properties are leased by the Council and sub-let to homeless households as temporary accommodation.
•  Serviced Accommodation is available in Cowal and Helensburgh and is for single people providing an en-suite bedroom and shared kitchen facilities.
• Supported accommodation is provided in Lorn by Blue Triangle Housing Association.
0
•  Emergency accommodation may on occasion be provided out with the location of the original presentation due to the pressure on the availability of temporary accommodation
17

Page 18

Period Area Target Actual Variance Status FQ3 Commentary
2024/25 FQ3 A&B 20.0% 23.6% 3.6% Green - Actual
exceeds Target
From the 44 tender/quick quote contract awards during FQ3, 55 suppliers were successful, 13 of which were local
suppliers. However, only 18 received local bids. The nature of the types of contracts awarded can impact on
submission of local bidders. Of the 18 contracts, 13 were awarded to local suppliers (72.2%) with an estimated
total contract value of £9.6m. The Procurement, Commercial and Contract Management Team will continue to
support local suppliers by providing useful information on the Council's website.
Period Actual FQ2 Commentary
2023/24 FQ3 27.8%
2023/24 FQ4 14.3%
2024/25 FQ1 36.0%
2024/25 FQ2 10.5%
2024/25 FQ3 23.6%
COI - Maintain the percentage of local suppliers that benefit from the award of contracts via the procurement portal
Responsible Person: Anne MacColl-Smith
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ3 exceeds the target and performance has increased since the last reporting period.
Actual trend line
From the 49 tender/quick quote contract awards during FQ2, 57 suppliers were successful, 6 of which were local suppliers.
However, only 12 received local bids. The nature of the types of contracts awarded can impact on submission of local bidders.
Of the 12 contracts, 6 were awarded to local suppliers (50.0%) with an estimated total contract value of £140k.
Corporate Outcome - Our economy is diverse and thriving
18

Page 19

Period Area Target Actual Variance Status FQ3 Commentary
2024/25 FQ3 A&B No Target 0 N/A N/A The next report covering FQ3 & FQ4 2024/25 will be available in April 2025.
Period Actual FQ2 Commentary
2023/24 FQ3 -
2023/24 FQ4 37
2024/25 FQ1 -
2024/25 FQ2 31
2024/25 FQ3
Actual trend line
We have been working closely with our suppliers to deliver additional social, economic and environmental value to our
society. 31 Community Benefits have been achieved through Contract Management, Contract Awards and the Request List
during Q1 & Q2 2024/25.
Corporate Outcome - Our economy is diverse and thriving
COI - Increase the number of community benefits that are delivered through contracts we award locally
Responsible Person: Anne MacColl-Smith
This indicator is a Corporate Outcome Indicator that is reported in FQ2 and FQ4. The performance presented is Council-wide only.
This indicator for...
19

Page 20

Period Area Target Actual Variance Status FQ3 Commentary
2024/25 FQ3 B&C 75% 87% 12% Green - Actual
exceeds Target
Continued Progress with the new tablets and software has seen a marked improvement across the service area.  46 faults
reported in total this quarter - a relatively low number. A generally busy period for the Service though and at a time when
staff do take annual leave.
Period Actual FQ2 Commentary
2023/24 FQ3 37%
2023/24 FQ4 90%
2024/25 FQ1 91%
2024/25 FQ2 100%
2024/25 FQ3 87%
2024/25 FQ3 A&B 75% 92% 17% Green - Actual
exceeds Target
Continued Progress with the new tablets and software has seen a marked improvement across the service area. 341 faults
reported in total this quarter - a high number but in general we deal with more faults in FQ3 and FQ4 each year.
This has been a busy quarter for the Service and at a time when staff do take annual leave. Capital Improvement Schemes will
have helped deal with lighting that was that was previously unrealiable.
Period Actual FQ2 Commentary
2023/24 FQ3 46%
2023/24 FQ4 49%
2024/25 FQ1 93%
2024/25 FQ2 97%
2024/25 FQ3 92%
Corporate Outcome - We have an infrastructure that supports sustainable growth
Percentage of street lighting faults repaired within 10 days
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ3 exceeds the target however performance has decreased since the last reporting period.
Actual trend line
Since the end of last quarter we now have real time access via remote access tablets for our electricians on the ground for
new jobs that come in. It was also summer months meaning the number of faults being logged where low.
This indicator for FQ3 exceeds the target however performance has decreased since the last reporting period.
Actual trend line
Overall introducing the new tablets has had a positive impact on the service, our electricians are working more efficently and
effectivly. Summer months also does mean less faults reported by the general public, however that may change in the
upcoming winter months. We also have carried out our capital improvements in the Lorn area, and are in the midst of
carrying out capital improvements on the Isle of Mull.
20

Page 21

Period Area Target Actual Variance Status FQ3 Commentary
2024/25 FQ3 Bute No Target 0 N/A N/A There were no waste collection complaints received this quarter for the Isle of Bute.  An excellent service provided by the
Waste Team.
Period Actual FQ2 Commentary
2023/24 FQ3 2
2023/24 FQ4 0
2024/25 FQ1 0
2024/25 FQ2 0
2024/25 FQ3 0
2024/25 FQ3 Cowal No Target 1 N/A N/A Another great service provided by the team in the Cowal area, only 1 waste collection complaint received.
Period Actual FQ2 Commentary
2023/24 FQ3 2
2023/24 FQ4 0
2024/25 FQ1 3
2024/25 FQ2 2
2024/25 FQ3 1
Corporate Outcome - We have an infrastructure that supports sustainable growth
Number of waste collection complaints
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ3 shows the number of waste collection complaints has remained the same since the last reporting period.
Actual trend line
There were only 2 waste collection complaints received for the Cowal area for the months of July, August and September. 
Given the number of properties serviced this is very good.
Actual trend line
Again this quarter there were no refuse collection complaints received for the Isle of Bute, an excellent service from the waste
team.
This indicator for FQ3 shows the number of waste collection complaints has decreased since the last reporting period.
21

Page 22

Period Area Target Actual Variance Status FQ3 Commentary
2024/25 FQ3 A&B No Target 36 N/A N/A
In total there were 36 waste collection complaints received for the whole Argyll and Bute Council area for the months of
October, November and December.  The majority of which were received in the Helensburgh and Lomond area due to vehicle
breakdowns and resourcing.  The teams are still delivering a very high level of service to the many properties throughout the
areas ensuring the domestic, recycling, glass and food waste is uplifted.
Period Actual FQ2 Commentary
2023/24 FQ3 18
2023/24 FQ4 7
2024/25 FQ1 38
2024/25 FQ2 26
2024/25 FQ3 36
Corporate Outcome - We have an infrastructure that supports sustainable growth
Number of waste collection complaints
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ3 shows the number of waste collection complaints has increased since the last reporting period.
Actual trend line
There were only 26 waste collection complaints received this quarter for the whole of the Argyll and Bute Council area.  Given
the number of properties serviced and the various waste collected over the summer months this is a very good level of
service.
22

Page 23

Period Area Target Actual Variance Status FQ3 Commentary
2024/25 FQ3 A&B 45.0% 65.4% 20.4% Green - Actual
exceeds Target
65.4% recycling, composting and recovery (37.2% recycling/composting plus 28.2% recovery) . Target exceeded mainly due to
high recovery levels for Helensburgh and Lomond's residual waste which now goes for refuse derived fuel (RDF) instead of
landfill. Less garden waste  composted during this quarter than FQ2 which is expected as green waste composting is higher
during spring/summer periods. Recycling and composting rate of 37.2% is marginally higher than same quarter in previous
year (which was 36.1%).
Period Actual FQ2 Commentary
2023/24 FQ3 49.0%
2023/24 FQ4 74.0%
2024/25 FQ1 68.4%
2024/25 FQ2 70.5%
2024/25 FQ3 65.4%
2024/25 FQ3 Renewi No Target 52.4% N/A N/A
52.4% recycling, composting and recovery (35.3% recycling/composting plus 17.1% recovery) . Less garden waste  composted
during this quarter than FQ2 which is expected as green waste composting is higher during spring/summer periods. Recycling
and composting rate of 35.3% is marginally higher than same quarter in previous year (which was 33.9%).
Period Actual FQ2 Commentary
2023/24 FQ3 55.3%
2023/24 FQ4 66.5%
2024/25 FQ1 56.2%
2024/25 FQ2 61.3%
2024/25 FQ3 52.4%
Actual trend line
70.5% recycling, composting and recovery (45.2% recycling/composting plus 25.3% recovery). Exceeds target due to increases
in recycling and recovery. For example, a significant amount of over 1000 tonnes of stockpiled rubble at Renewi's Moleigh
Waste and Recycling Facility was processed into materials for hardstanding at the site during the quarter. There was also
slight tonnage increases in recycling of wood, blue bin materials and glass during the quarter. Recovery continues to improve
compared to 2023 with the Helensburgh and Lomond general waste no longer going to landfill and instead going for refuse
derived fuel (RDF)/energy from waste (EFW).
This indicator for FQ3 shows the percentage of waste recycled has decreased since the last reporting period.
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - Percentage of waste recycled, composted and recovered
Responsible Person: John Blake
This indicator is reported quarterly. The performance presented is by Council-wide service provision.
This indicator for FQ3 exceeds the target however performance has decreased since the last reporting period.
Actual trend line
61.3% recycling, composting and recovery (44.3% recycling/composting plus 17.0% recovery). Increased recycling during the
quarter mainly due to over 1000 tonnes of stockpiled rubble at Renewi's Moleigh Waste and Recycling Facility being
processed into materials for hardstanding at the site. There was also slight tonnage increase in blue bin recycling during the
quarter.
23

Page 24

Period Area Target Actual Variance Status 0
2024/25 FQ3 Islands No Target 44.2% N/A N/A
44.2% recycling, composting and recovery (31.9% recycling/composting plus 12.3% recovery) . Less garden waste  composted
during this quarter than FQ2 which is expected as green waste composting is higher during spring/summer periods. Recovery
rate of 12.3% in quarter is higher than same quarter in previous year (which was 0%) as residual waste from Coll and Tiree
now goes for refuse derived fuel (RDF) instead of landfill.
Period Actual FQ2 Commentary
2023/24 FQ3 34.2%
2023/24 FQ4 41.5%
2024/25 FQ1 45.8%
2024/25 FQ2 51.8%
2024/25 FQ3 44.2%
2024/25 FQ3 H&L No Target 100.0% N/A N/A
100% recycling, composting and recovery (43.1% recycling/composting plus 56.9% recovery) . High recovery levels for
Helensburgh and Lomond's residual waste which now goes for refuse derived fuel (RDF) instead of landfill. Less garden waste 
composted during this quarter than FQ2 which is expected as green waste composting is higher during spring/summer
periods. Recycling and composting rate of 43.1% is marginally higher than same quarter in previous year (which was 40.8%).
Period Actual FQ2 Commentary
2023/24 FQ3 41.5%
2023/24 FQ4 100.0%
2024/25 FQ1 100.0%
2024/25 FQ2 100.0%
2024/25 FQ3 100.0%
This indicator for FQ3 shows the percentage of waste recycled has decreased since the last reporting period.
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - Percentage of waste recycled, composted and recovered
Responsible Person: John Blake
This indicator is reported quarterly. The performance presented is by Council-wide service provision.
Actual trend line
100% recycling, composting and recovery (48% recycling/composting plus 52% recovery). There was slight tonnage increases
in recycling of wood, blue bin materials and glass during the quarter. Recovery continues to be high compared to 2023 with
the Helensburgh and Lomond general waste no longer going to landfill and instead going for refuse derived fuel (RDF)/energy
from waste (EFW).
Actual trend line
51.8% recycling, composting and recovery (43.5% recycling/composting plus 8.2% recovery). There was  slight tonnage
increases in recycling of wood, blue bin materials and glass during the quarter. Recovery continues to improve compared to
2023 with the Tiree/Coll general waste no longer going to landfill and instead going for refuse derived fuel (RDF)/energy from
waste (EFW).
This indicator for FQ3 shows the percentage of waste recycled has remained the same since the last reporting period.
24

Page 25

Period Area Target Actual Variance Status FQ3 Commentary
2024/25 FQ3 A&B 5,100 2,846 -2,254 Green - Actual
below Target
Well within biodegradable municpal waste target for the quarter mainly due to the residual waste from Helensburgh and
Lomond area now all going for refuse derived fuel (RDF)/ energy from waste (EFW) whereas this was previously sent to landfill
in same quarter in 2023.
Period Target Actual FQ2 Commentary
2023/24 FQ3 5,100 4,253
2023/24 FQ4 5,000 2,567
2024/25 FQ1 5,850 3,200
2024/25 FQ2 5,550 3,225
2024/25 FQ3 5,100 2,846
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - Number of tonnes of waste sent to landfill
Responsible Person: John Blake
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ3 is lower than the target (lowest is best).
Actual trend line
Well within target partly due to increased recycling during the quarter e.g. rubble, wood, glass and blue bin recycling. A
significant factor also is that the Helensburgh and Lomond general waste now goes for refuse derived fuel (RDF)/energy from
waste (EFW) instead of going to landfill (which it was in 2023).
25

Page 26

Period Area Target Actual Variance Status FQ3 Commentary
2024/25 FQ3 Bute 73 78 5 Green - Actual
exceeds Target
The Isle of Bute has again this quarter exceeded the bench marking and national average with a street cleanliness score of 78, 
meaning the Island's street cleanliness is to a good standard.
Period Actual FQ2 Commentary
2023/24 FQ3 80
2023/24 FQ4 81
2024/25 FQ1 81
2024/25 FQ2 80
2024/25 FQ3 78
2024/25 FQ3 Cowal 73 77 4 Green - Actual
exceeds Target
Cowal's street cleanliness figure remains steady this quarter, thanks to the teams working in this area ensuring the area is well
maintained.
Period Actual FQ2 Commentary
2023/24 FQ3 77
2023/24 FQ4 76
2024/25 FQ1 75
2024/25 FQ2 78
2024/25 FQ3 77
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - LEAMS (Local Environment Audit and Management System)
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ3 exceeds the target however performance has decreased since the last reporting period.
Actual trend line
Again this quarter the street cleansing figure for the Cowal area remains good at 78.
Actual trend line
Again this quarter the street cleansing figure for the Isle of Bute remains high at 80, exceeding both the national standard and
benchmark figure.
This indicator for FQ3 exceeds the target however performance has decreased since the last reporting period.
26

Page 27

Period Area Target Actual Variance Status FQ3 Commentary
2024/25 FQ3 A&B 73 84 11 Green - Actual
exceeds Target
The street cleanliness figure for the months of October, November and December for the whole of the Argyll and Bute Council
area remains high.  This means the areas scored show no or a very small amount of litter visible but not detracting from the
look of the area.  The teams on both the mainland and islands are providing a good service by ensuring weeds, detritus, litter,
fly posting, grafitti etc are being dealt with timeously.
Period Actual FQ2 Commentary
2023/24 FQ3 85
2023/24 FQ4 83
2024/25 FQ1 84
2024/25 FQ2 85
2024/25 FQ3 84
Actual trend line
For the months of July, August and September the overall figure for street cleanliness within Argyll and Bute is sitting at 85,
this is a very good level of service provided by the teams on both the mainland and the Islands.
This indicator for FQ3 exceeds the target however performance has decreased since the last reporting period.
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - LEAMS (Local Environment Audit and Management System)
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
27

Page 28

Period Area Target Actual Variance Status FQ3 Commentary
2024/25 FQ3 B&C No Target 3.76 N/A N/A Work days lost has increased by 0.04 of a day on the same quarter last year and has increased by 1.67 of a day from the
previous quarter.
Period Actual FQ2 Commentary
2023/24 FQ3 3.72
2023/24 FQ4 4.00
2024/25 FQ1 2.95
2024/25 FQ2 2.09
2024/25 FQ2 3.76
2024/25 FQ3 A&B No Target 2.89 N/A N/A Work days lost has increased by 0.07 of a day on the same quarter last year and has increased by 1.12 of a day from the
previous quarter.
Period Actual FQ2 Commentary
2023/24 FQ3 2.82
2023/24 FQ4 2.82
2024/25 FQ1 2.14
2024/25 FQ2 1.77
2024/25 FQ3 2.89
Corporate Outcome - Making it happen
COI - Teacher sickness absence
Responsible Person: Jennifer Crocket (B&C and MAKI) / Wendy Brownlie (H&L and OLI)
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ3 shows the number of sickness absence days has increased since the last reporting period.
Actual trend line
Work days lost has increased by 0.09 of a day on the same quarter last year and has decreased by 0.86 of a day from the
previous quarter.  Main work days lost have been due to long term Medical Treatment related reasons.
This indicator for FQ3 shows the number of sickness absence days has increased since the last reporting period.
Actual trend line
Work days lost has increased by 0.52 of a day on the same quarter last year and has decreased by 0.37 of a day from the
previous quarter.  Main work days lost have been due to Mental Health related reasons.
28

Page 29

Period Area Target Actual Variance Status FQ3 Commentary
2024/25 FQ3 B&C No Target 4.65 N/A N/A Work days lost has increased by 0.23 of a day on the same quarter last year and has increased by 0.78 of a day from the
previous quarter.
Period Actual FQ2 Commentary
2023/24 FQ3 4.42
2023/24 FQ4 4.64
2024/25 FQ1 4.53
2024/25 FQ2 3.87
2024/25 FQ3 4.65
2024/25 FQ3 A&B No Target 4.40 N/A N/A Work days lost has increased by 0.67 of a day on the same quarter last year and has increased by 0.97 of a day from the
previous quarter. 
Period Actual FQ2 Commentary
2023/24 FQ3 3.73
2023/24 FQ4 4.12
2024/25 FQ1 3.85
2024/25 FQ2 3.43
2024/25 FQ3 4.40
Corporate Outcome - Making it happen
COI - LGE staff (including non-Teacher) sickness absence
Responsible Person: Carolyn Cairns
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ3 shows the number of sickness absence days has increased since the last reporting period.
Actual trend line
Work days lost has increased by 0.25 of a day on the same quarter last year and has decreased by 0.42 of a day from the
previous quarter.  Main work days lost have been due to Mental Health related reasons.
This indicator for FQ3 shows the number of sickness absence days has increased since the last reporting period.
Actual trend line
Work days lost has increased by 0.37 of a day on the same quarter last year and has decreased by 0.66 of a day from the
previous quarter.  Main work days lost have been due to Mental Health related reasons.
29

Page 30

Period Area Target Actual Variance Status FQ3 Commentary
2024/25 FQ3 A&B 70.0% 82.7% 12.7% Green - Actual
exceeds Target
In FQ3 there were 33,666 customer transactions dealt with by Customer Service Agents (17.3%) and 160,491
were automated or self-service transactions (82.7%) so the 70.0% target was substantially bettered.  This was
largely due to the significant increase in customers using the improved Bin Day Uplift online resources.
Period Actual FQ2 Commentary
2023/24 FQ3 72.7%
2023/24 FQ4 70.1%
2024/25 FQ1 71.6%
2024/25 FQ2 72.7%
2024/25 FQ3 82.7%
Corporate Outcome - Making it happen
COI - Increase the percentage of all self-service automated contacts
Responsible Person: Robert Miller
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ3 exceeds the target and performance has increased since the last reporting period.
Actual trend line
In FQ2 there were 39,421 customer transactions dealt with by Customer Service Agents (27.3%) and 104,776 were automated
or self-service transactions (72.7%) so the 70.0% target was bettered. 
30