Democracy Spraffa

Agenda reports pack

Argyll and Bute Council · 3 June 2025
Back to Bute and Cowal Area Committee — 3 June 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 605522
DX 599700 LOCHGILPHEAD
26 May 2025 
NOTICE OF MEETING 
A meeting of the BUTE AND COWAL AREA COMMITTEE will be held ON A HYBRID BASIS IN
THE QUEEN'S HALL, DUNOON AND BY MICROSOFT TEAMS on TUESDAY, 3 JUNE 2025 at
10:00 AM, which you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. MINUTES 
(a) Bute and Cowal Area Committee - 4 March 2025 (Pages 3 - 8) 
(b) Bute and Cowal Area Community Planning Group - 6 May 2025 (Pages 9 - 18) 
(c) Cowal Transport Forum - 9 May 2025 (Pages 19 - 24) 
4. PUBLIC QUESTION TIME 
5. ARGYLL COMMUNITY HOUSING ASSOCIATION (ACHA) UPDATE (Pages 25 -
34)  
Presentation by Chief Executive, Argyll Community Housing Association 
6. ARGYLL AND BUTE COUNCIL SECONDARY SCHOOL ATTAINMENT REPORTS 
(a) Dunoon Grammar School (Pages 35 - 54) 
Report by Executive Director with responsibility for Education 
(b) Rothesay Academy (Pages 55 - 74) 
Report by Executive Director with responsibility for Education 
7. ARGYLL AND BUTE HEALTH AND SOCIAL CARE PARTNERSHIP
PERFORMANCE REPORT - FQ3 2024/25 (Pages 75 - 90)
Public Document Pack

Page 2

Report by Senior Manager, Performance and Improvement, Argyll and Bute Health
and Social Care Partnership 
8. ROADS AND INFRASTRUCTURE SERVICES UPDATE (Pages 91 - 94)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
9. ROTHESAY PAVILION TO ALBERT PIER ACTIVE TRAVEL PROJECT -
UPDATED REPORTS (Pages 95 - 392)  
Report by Executive Director with responsibility for Development and Economic
Growth 
10. AREA PERFORMANCE REPORT - FQ4 2024/25 (Pages 393 - 424)  
Report by Executive Director with responsibility for Customer Support Services   
REPORTS FOR NOTING 
11. CRUACH MOR AND CLACHAN FLATS WIND FARM TRUSTS (Pages 425 - 430)  
Report by Executive Director with responsibility for Legal and Regulatory Support 
12. DRAFT BUTE AND COWAL AREA COMMITTEE WORKPLAN (Pages 431 - 434) 
Bute and Cowal Area Committee 
Councillor Gordon Blair (Chair) Councillor Audrey Forrest
Councillor Daniel Hampsey Councillor Reeni Kennedy-Boyle (Vice-Chair)
Councillor Liz McCabe Councillor Yvonne McNeilly
Councillor Ross Moreland Councillor William Sinclair
Councillor Peter Wallace   
Contact: Stuart McLean, Committee Manager - 01436 658717

Page 3

MINUTES of MEETING of BUTE AND COWAL AREA COMMITTEE held ON A HYBRID BASIS
IN THE FYNE HOMES BOARDROOM, 11 VICTORIA STREET, ROTHESAY AND BY
MICROSOFT TEAMS on TUESDAY, 4 MARCH 2025 
Present: Councillor Gordon Blair (Chair) 
Councillor Daniel Hampsey
Councillor Liz McCabe
Councillor Ross Moreland
Councillor Peter Wallace 
Councillor Audrey Forrest
Councillor Reeni Kennedy-Boyle
Councillor Yvonne McNeilly
Councillor William Sinclair
Attending: Stuart McLean, Committee Manager
Colin Young, Strategic Transportation Delivery Officer
Douglas Whyte, Housing Strategy Manager
Verity Lundy, Head Teacher
Louise Blair, Head Teacher
Susan Galloway, Education Manager
Mark Calder, Project Manager
Jean Moffat, Bute Community Council
Catriona Renfrew, Kilfinan Community Council
Darren Adams, Dunoon Observer
Andrew Galloway, Local Democracy Reporter 
1. APOLOGIES FOR ABSENCE 
The Chair welcomed everyone to the meeting. 
There were no apologies for absence intimated. 
2. DECLARATIONS OF INTEREST 
Councillor Reeni Kennedy-Boyle declared a financial interest in relation to items 9 &
10 (2024-25 Active Travel Progress Report) and (Rothesay Pavilion to Albert Pier
Active Travel Project Updated Reports) due to her occupation as General Manager
of Fyne Futures which is a subsidiary of Fyne Homes, Councillor Kennedy-Boyle
added that Fyne Futures has been engaged in delivering projects associated with
active travel on the Isle of Bute and that even though Fyne Futures have not been in
receipt of any funding through Argyll and Bute Council recently, they may consider
applying for funding in the future and as such she would leave the meeting and take
no part in the consideration of these items. 
3. MINUTES 
(a) Bute and Cowal Area Committee - 3 December 2024 
The Minute of the meeting of the Bute and Cowal Area Committee, held
on 3 December 2024 was approved as a correct record. 
Page 3 Agenda Item 3a

Page 4

(b) Cowal Transport Forum - 29 January 2025 
The Minute of the meeting of the Cowal Transport Forum, held on 29
January 2025 was noted. 
(c) Bute and Cowal Area Community Planning Group - 4 February 2025 
The Minute of the meeting of the Bute and Cowal Area Community
Planning Group, held on 4 February 2025 was noted. 
4. PUBLIC QUESTION TIME 
The Committee Manager advised that there had been questions submitted by
members of the public in advance of the meeting, and details of these questions
were provided to the Committee. 
Question - Save Cowal's Hills 
Are the Committee concerned about the recently proposed Windfarm (by E-Power)
on Black Craig, for 13 'monster' turbines, each 656ft high? (named Inverchaolain
Windfarm)? 
And do they realise that a similar application (for much smaller turbines) was
refused at a PLI held in Colintraive in 2009, due to 'unacceptable visual impact', this
referring to the views north from Rothesay and North Bute? 
The Chair advised that he is content with the established planning process and that
the Council will take part in this scooping exercise as and when it is appropriate. 
Councillor Sinclair noted his frustration that Section 36 applications for planning
permission, such as Inverchaolain Windfarm, largely by-passes elected members
and the number of Windfarms in, and planned, is placing huge pressure on the
locality. 
Councillor McNeilly acknowledged the importance of the planning process and that it
must be beyond reproach. 
Question – Alison Ireland – Dunoon Library 
Why was there no consultation with the community?
Why were the staff told a few days before the event?
Why change an area which was designed as a library and is so much more?
Computer space, desk space, children’s area, warm space and so much more.
If indeed it becomes a performance area then the area already designated for that
purpose will be underused.
Surely we should be encouraging use rather than dumbing down. We could be proud
of that beautiful setting. 
The Chair referred to correspondence received from the Live Argyll Library Team,
advising that: 
We are writing to address some inaccuracies circulating on social media and provide
clarity on the status and future plans for Dunoon Library. 
Page 4

Page 5

First and foremost, Dunoon Library is not closing. It is being relocated within the
Queen’s Hall as part of a repurposing exercise to ensure that the available space is
used to its full potential. Despite the misinformation, the live book stock will remain
intact. However, obsolete or dead stock, i.e., books that have not been issued for
several years—some exceeding 10 years—will be removed. 
Live Argyll, as a charity, must ensure that all spaces and facilities are used
efficiently. As part of the relocation, a dedicated adult library will be created on the
ground floor, along with a separate Children’s area. All current library services will
remain fully operational with access being extended with longer opening hours. 
Contrary to the many inaccuracies on social media, the current library space will not
be converted into a bar. Instead, it will have multi-purpose functionality, including
small conferencing, meeting space, event space, studio space, and more, all
available to the community. 
Lastly, it is important to note that live Argyll has a cost base of £7.5 million and is
only partly funded by Argyll and Bute Council. The significant majority of costs are
covered through income generation. For services to remain in their current form, live
Argyll must ensure that all venues are used to their maximum potential. Income
generation is crucial as it allows the funding of all leisure, Library, Active Schools,
and Community Learning services. There is no profit or shareholders; every penny is
reinvested into services. 
Thank you for your understanding and continued support. 
Councillor Sinclair advised that as a member of the Live Argyll Board that they are
tasked with making difficult decisions to ensure that services meet the expectations
of customers. 
Councillor Daniel Hampsey added that he had been approached by constituents
around the legality of the decision made by Live Argyll and that he had received
confirmation from the Councils Legal Department that the decision was competent.
Councillor Hampsey further advised that he had been assured that the books
identified for removal would not be binned and would remain available to customers
on request. 
The Chair invited those attending to submit any questions they had. 
Catriona Renfrew 
Catriona Renfrew advised that she was concerned that residents had received
promotional material for the Argyll Rally for 2025 even though, to the best of their
knowledge, no approval had been given for this event. Miss Renfrew asked: 
How will the decision be made regarding the planned Argyll Rally? 
What role will affected communities have in this decision making process? 
The Chair advised that he has been liaising with the Officers around various aspects
of the proposed Argyll Rally, including the Economic Impact Assessment and the
Page 5

Page 6

approval process and that he will contact Miss Renfrew with further details in due
course. 
The Project Manager clarified that the Economic Impact Assessment would be
undertaken using the methodology that is supported by the Scottish Government and
that the Council would ensure that adequate consultation had been undertaken as
required by legislation. Mr Calder further advised that any promotional material
circulated on behalf of the Rally was done so by the organisers and that this was out
with the control of the Council. 
The Bute and Cowal Area Committee agreed to hold a Business Day to discuss the
planned Argyll Rally and that Council Officers, and Rally Organisers and community
representatives be invited to attend. 
5. AREA PERFORMANCE REPORT - FQ3 2024/25 
The Committee gave consideration to the Area Performance Report for financial
quarter 3 of 2024/25 (October to December 2024) which illustrated the agreed
performance measures for this period. 
Decision 
The Bute and Cowal Area Committee noted the performance and supporting
commentary as presented. 
(Reference: Report by Executive Director with responsibility for Customer Support
Services, dated 11 February 2025, submitted) 
6. ROADS AND INFRASTRUCTURE SERVICES UPDATE 
The Committee gave consideration to a report which provided links to the recent
activities of Roads and Infrastructure Services. 
Decision 
The Bute and Cowal Area Committee noted the contents of the report. 
(Reference: Report by Executive Director with responsibility for Roads and
Infrastructure Services, dated February 2025, submitted) 
7. PRIMARY AREA ATTAINMENT REPORT: BUTE AND COWAL (B&C) 
The Committee gave consideration to a report and a presentation which provided a
range of key information about primary school provision in the Bute and Cowal area
during the school session June 2024 to January 2025 and reported the national
collection of attainment and achievement data from June 2024. 
Decision 
The Bute and Cowal Area Committee considered and noted the information provided
within the report and presentation. 
Page 6

Page 7

(Reference: Report by Executive Director with responsibility for Education, dated
February 2025, submitted) 
8. HOUSING SERVICES ACTIVITY UPDATE - STRATEGIC HOUSING
INVESTMENT PLAN (SHIP) ANNUAL UPDATE 
Consideration was given to a report which provided an update on Housing Services
activity and the delivery of the Local Housing Strategy within the Bute and Cowal
area. 
Decision 
The Bute and Cowal Area Committee considered and noted the contents of the
report. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth, dated January 2025, submitted) 
Councillor Reeni Kennedy-Boyle, having declared an interest in relation to the
following two items of business, left the meeting and took no part in the consideration
of these items. 
9. 2024/25 ACTIVE TRAVEL PROGRESS REPORT 
The Committee gave consideration to a report which provided an update on the
progress made in 2024/25 in relation to active travel projects in the Bute and Cowal
area, and sought continued support for the projects from Members. 
Decision 
The Bute and Cowal Area Committee agreed to: 
1. Welcome the progress made to date across a significant number of active
travel projects by the small Active Travel Team. 
2. Support the continuation of the projects and the submission of future funding
applications to external challenge funds to continue to develop design and
construction stages in order to deliver these projects. 
3. Support the allocation of the Tier 1 active travel funding element in the
Council’s 25/26 block grant to the development and delivery of appropriate
active travel projects, including those already underway in Bute and Cowal. 
4. Instruct Officers to continue to identify and develop new active travel projects
to benefit local residents, businesses and communities. 
(Reference: Report by Executive Director with responsibility for Development and Economic
Growth, dated 3 February 2025, submitted) 
10. ROTHESAY PAVILION TO ALBERT PIER ACTIVE TRAVEL PROJECT:
UPDATED REPORTS 
Page 7

Page 8

Consideration was given to a report updating members on the changes made to the
Rothesay Pavilion to Albert Pier Active Travel Project initial feasibility and concept design
reports. 
Decision 
The Bute and Cowal Area Committee agreed to continue consideration of this report to the
June meeting to allow Officers to reflect on comments made during the meeting, specifically
in terms of car parking and loading and servicing provision.
(Reference: Report by Executive Director with responsibility for Development and Economic
Growth, dated February 2025, submitted) 
Councillor Reeni Kennedy-Boyle re-joined the meeting at this point. 
11. DRAFT BUTE AND COWAL AREA COMMITTEE WORKPLAN 
The Bute and Cowal Area Committee workplan was before members for information. 
Decision 
The Bute and Cowal Committee noted the contents of the workplan. 
(Reference: Bute and Cowal Area Committee workplan, dated 13 March 2025,
submitted) 
12. LAMONT BEQUEST AWARD RECOMMENDATIONS 
The Committee gave consideration to a report providing information regarding three
applications that had been received for support for the Lamont Bequest. 
Decision 
The Bute and Cowal Area Committee agreed to award £100 to each of the family
applicants and £50 to the individual applicant who met the criteria for support from
the Lamont Bequest. 
(Reference: Report by the Executive Director with responsibility for Legal and
Regulatory Support, dated February 2025, submitted) 
Page 8

Page 9

MINUTES of MEETING of BUTE AND COWAL COMMUNITY PLANNING GROUP held BY
MICROSOFT TEAMS on TUESDAY, 6 MAY 2025 
Present: Jean Moffat, Bute Community Council  (Chair) 
Councillor Gordon Blair
Councillor Ross Moreland
Councillor Peter Wallace
Stuart McLean, Committee Manager, Argyll and Bute Council
Reeni Kennedy-Boyle, Fyne Futures
Andy MacPherson, Argyll and Bute Climate Action Network
Lucy Sumsion, National Farmers’ Union (NFU)
Inspector Bart Simonis, Police Scotland
Rhona Altin, University of the Highland and Islands, Argyll
John Miller, Scottish Fire and Rescue
Janis Marshall Reilly, Argyll and Bute Third Sector Interface (TSI)
Melony MacLean, Argyll Community Housing Association
Fiona Gillesbie, Bute Resiliance
Ann Campbell, Dunoon Community Development Trust
Ian Woodcock, Transport Scotland
Catriona Renfrew, Argyll and Bute Citizens Advice Bureau
Ann Kennovin, Community Learning, Argyll and Bute 
Attending: Councillor William Sinclair 
Rona Gold, Community Planning, Argyll and Bute
John McLuckie, Community Planning, Argyll and Bute
Ailie Law, Community Planning, Argyll and Bute
Lucy Dunbar, Area Plans Officer, Argyll and Bute
Milly Leggett, Area Plans Officer, Argyll and Bute
Francesco Bertoldi, National Islands Plan Team Leader, Scottish Government
Andrew Galloway, Local Democracy Reporter
Chris Martin, Dunoon Observer 
The Chair ruled and Partners agreed to alter the order of business of the Agenda by
taking Item 7, the National Islands Plan after consideration of the Minutes of the
previous meeting. 
1. WELCOME AND APOLOGIES 
The Chair welcomed everyone to the meeting and general introductions were made. 
Apologies for absence were intimated on behalf of: 
Rhyddian Knight, Friends of Glenan Woods
Michelle Mundie, Argyll Community Housing Association
Jen Broadhurst, Citizens Advice Bureau
Rhona Grant, Live Argyll 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest intimated.
Page 9 Agenda Item 3b

Page 10

3. MINUTES 
(a) Meeting of the Bute and Cowal Community Planning Group held on 4
February 2025 
The Minute of the Bute and Cowal Area Planning Group meeting held on
4 February 2025 was approved as a correct record. 
4. NATIONAL ISLANDS PLAN 
The Group heard a comprehensive presentation from Francesco Bertoldi on the
development and renewal of the Scottish Government National Islands Plan for
Scotland. Francesco provided the background to the Plan from the Islands Scotland
(2018) to the Scottish Islands Survey Report in September 2024. 
Francesco advised that the current national islands plan overarching objective is to
improve outcomes for island communities and features 13 strategic objectives with
over 130 commitments. Whereas the new National Island Plan seeks to be a more
agile document, with fewer strategic objectives with a focus on additionality, fewer
commitments and a clear allocation of responsibilities. 
Partners noted that there is a dedicated resource and capital budget to support the
implementation of the Plan and that investments delivered to date include over £15
million capital since 2021-2022 through the Islands Programme, 71 projects on 51
islands supported. Francesco further advised that since December 2022 £3.4 million
had been awarded through the Islands Cost Crisis Emergency Fund. 
There was a question and answer session and it was noted that the PowerPoint
presentation will be provided to the Area Community Planning Group. 
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
contents of the presentation. 
(Reference: Presentation by Francesco Bertoldi, Scottish Government, dated 6 May
2025) 
5. APPOINTMENT OF VICE-CHAIR OF THE BUTE AND COWAL AREA
COMMUNITY PLANNING GROUP 
The Group considered a report which provided information in relation to the
appointment of a Vice-Chair of the Bute and Cowal Area Community Planning Group
and outlined the expected time commitment and information about the role. 
Decision 
The Bute and Cowal Area Community Planning Group agreed that Reeni Kennedy-
Boyle, Fyne Futures be appointed as Vice-Chair. 
(Reference: Report by Committee Manager, dated 6 May 2025, submitted)
Page 10

Page 11

6. COMMUNITY PLANNING PARTNERSHIP MANAGEMENT COMMITTEE
MEETING HIGHLIGHTS 
The Group gave consideration to a report which outlined matters discussed during a
meeting of the Community Planning Partnership (CPP) Management Committee
held on 16 April 2025. The report provided information on the Community Planning
Self-Assessment Draft Improvement Plan; the next steps for Argyll and Bute
Outcomes Improvement Plan 2024-2034; the CPP Climate Change Strategy and
Acton Plan; CPP Community Wealth Building (CWB) Short Life Steering Group; the
Community Justice Partnership; Community Learning and Development (CLD)
Strategic Partnership Plan; a demonstration of the Aspiring Places Platform and
guidance feedback on Fair Funding. 
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
contents of the report. 
(Reference: Report by John McLuckie, Partnerships Lead, dated 6 May 2025,
submitted) 
7. TRANSPORT 
The Group gave consideration to a presentation from the Community Development
Team, Argyll and Bute Council which highlighted actions being taken to tackle
transport issues in Argyll and Bute. Following the presentation, there was a question
and answer session with the following statements made: 
- It would be helpful to discuss the microcosms around transport integration
within the locality. 
- Transport and the provision of it is critical to ensuring health and wealth within
the locality. 
- Those Groups that have undertaken transport related surveys should be
approached and encouraged to share information. 
- Community Councils should be invited to contribute to this area. 
The Community Development Team thanked Partners for their comments, advising
that this was the start of an ongoing conversation on transport at Area Community
Planning Groups. 
Decision 
The Bute and Cowal Area Community Planning Group considered, discussed and
noted the contents of the presentation. 
(Reference: Presentation by the Community Development Team dated 6 May 2025) 
8. PARTNER UPDATES 
Page 11

Page 12

(a) Police Scotland Update 
The Group gave consideration to a report highlighting Police Scotland’s
priorities for the Cowal, Bute and Helensburgh area which covered
serious and organised crime; crimes of theft and dishonesty; road safety
and road crime; violent crime and public protection. Ian further updated on
the Summer action plan and motorcycling and the white lining in prime
locations. 
Decision 
The Bute and Cowal Area Community Planning Group considered and
noted the contents of the report. 
(Reference: Report by Police Scotland, dated April 2025, submitted) 
(b) Scottish Fire and Rescue Service Update 
The Group gave consideration to a report highlighting the Scottish Fire
and Rescue Service’s (SFRS) FQ4 review of local performance across
Bute and Cowal for the period 2024/25. The report included information
on the local firefighter training plan; accidental dwelling fires; wild fires;
community engagement and LSO activities and the new home fire safety
visit referral application. 
Decision 
The Bute and Cowal Area Community Planning Group considered and
noted the contents of the report. 
(Reference: Report by Scottish Fire and Rescue Service dated January to
March 2025, submitted) 
(c) Supporting Communities - verbal update 
The Group were provided with an update on supporting communities fund
which is now open for applications until the end of May. Partners were
encouraged to apply by contacting the community development team or
accessing the website. 
Decision 
The Bute and Cowal Area Community Planning Group considered and
noted the contents of the update. 
(Reference: Verbal update by the Community Development Team) 
(d) Fyne Futures Update 
Consideration was given to an update which provided information on the
ongoing work and priorities of Fyne Futures including their 20th
anniversary of being a charity and social enterprise; a summary of their
Page 12

Page 13

achievements included employability and volunteering; Bute produce –
where people grow; ReStyle – from one good home to another and Bike
Bute and the Active Travel project supported by Hitrans. 
Decision 
The Bute and Cowal Area Community Planning Group considered and
noted the contents of the report. 
(Reference: Report by Fyne Futures, submitted) 
(e) Argyll Community Housing Association (ACHA) - Annual Update 
The Group gave consideration to ACHA’s annual update which provided
information on their stock in Bute and Cowal; the regeneration
programme; achievements since April 2024; work undertaken with
communities; improvements to properties; sheltered housing; allocation
and reletting of properties; exemplar estates; the customer involvement
strategy; an update on their plans and performance benchmarking. 
Decision 
The Bute and Cowal Area Community Planning Group considered and
noted the contents of the report. 
(Reference: Report by Argyll Community Housing Association dated 1
April 2025, submitted) 
(f) Dunoon Community Development Trust - Local Place Plan 
The Group considered a report by the Dunoon Community Development
Trust which provided the background to the development of a Local Place
Plan for Dunoon & Kirn. Dunoon Community Development Trust aims to
submit their plan to Argyll and Bute Council for validation by November
2025. Ann Campbell provided further information on future funding from
the Scottish Government to develop a local place plan, which will inform a
community action plan with a focus on wellbeing. 
Decision 
The Bute and Cowal Area Community Planning Group considered and
noted the contents of the report. 
(Reference: Report by Dunoon Community Development Trust dated 9
April 2025, submitted) 
(g) Argyll and Bute Third Sector Interface (TSI) 
Consideration was given to an update from Janis Marshall Reilly from
Argyll and Bute TSI. The update included information in relation to the
Chief Executive lobbying of the Scottish Government on third sector
issues such as fair funding; investment in prevention and public sector
reform. Janis further advised that the community mental health fund now
Page 13

Page 14

offers two years of funding rather than one. Information on upcoming
events including a joint event with Scottish Poverty Alliance and the
Annual Volunteer of the Year awards are listed on the TSI events
webpage were also referenced. 
Decision 
The Bute and Cowal Area Community Planning Group considered and
noted the information provided. 
(Reference: Report by Argyll and Bute TSI, dated April 2025, submitted) 
(h) Public Health Update 
Consideration was given to a public health update from Argyll and Bute
Health and Social Care Partnership’s Public Health Team on the ongoing
wellbeing and prevention activities overseen and delivered by them in
Argyll and Bute. The update provided information regarding Mental Health
Awareness and Suicide Prevention Training; Free condoms by post;
Speakeasy training and screening inequalities. 
The update also highlighted that 5 sector organisations were awarded
small grants in 2024-25 to increase knowledge and understanding of
national screening programmes, so people can make an informed choice
and provided information on how they the organisations area using the
money to promote screening. 
Decision 
The Bute and Cowal Area Community Planning Group noted the
information provided. 
(Reference: Report by Health Improvement Senior Lead, Argyll and Bute
Health and Social Care Partnership, dated May 2025, submitted) 
(i) Transport Scotland 
Consideration was given to an update from Transport Scotland which
highlighted the ongoing works at the rest and be thankful; completed
works along the A82; resurfacing, layby improvements and Cairndow
signage; ongoing works on the A82T and routine maintenance works;
upcoming works for resurfacing, drainage improvement and 20mph roll
out at Arrochar and Tarbet. 
Decision 
The Bute and Cowal Area Community Planning Group noted the
information provided. 
(Reference: Report by Area Manager, Transport Scotland, submitted) 
(j) UHI Argyll Update 
Page 14

Page 15

Consideration was given to a written update from UHI Argyll. The update
included information on an open week held in March; Modern
Apprenticeship Programme; new short courses including Horticulture,
Maritime and Nursing, commercial courses and the Academic Year for
2025-2026. 
Decision 
The Bute and Cowal Area Community Planning Group considered and
noted the information provided. 
(Reference: Report by UHI Argyll dated 25 April 2025, submitted) 
(k) Citizens Advice Bureau Update 
Consideration was given to a written update from Citizens Advice Bureau.
The update included information on advice provision and advice areas
during February, March and April 2025; volunteer recruitment and
services with the Bureau. 
Decision 
The Bute and Cowal Area Community Planning Group considered and
noted the information provided. 
(Reference: Report by Citizens Advice Bureau dated May 2025,
submitted) 
(l) Opportunity for Verbal Updates 
South Cowal Community Council 
In the absence of South Cowal Community Council the Committee
Manager presented the following update on their behalf: 
South Cowal Community Council agreed some months ago to set up a
development trust for the South Cowal area. 
An application was submitted to OSCR in late December and the trust
was formally approved last week. 
The founding trustees are Michael Breslin, Alan Stewart, Martin Anstess,
Alasdair Finlay and Mike Geraghty. Here are the purposes of the trust: 
"the prevention or relief of poverty", "the advancement of education", "the
advancement of citizenship or community development", "the
advancement of the arts, heritage, culture or science", "the advancement
of public participation in sport", "the provision of recreational facilities, or
the organisation of recreational activities, with the object of improving the
conditions of life for the persons for whom the facilities or activities are
primarily intended", "the advancement of environmental protection or
improvement" 
Page 15

Page 16

The trust is a Scottish Charitable Incorporated Organisation and further
information will be available in due course. 
Live Argyll 
Ann Kennovin provided the Group with an update on the work streams of
Live Argyll including:- 
Youth Services in Cowal and the Easter Give Programme; Volunteering at
a local care home; Heart Start Programme; P7 transition for rural schools;
support Dunoon Grammar with their transition; meeting with parents of
children staying at the hostel; Social 22 and wider achievement and
attainment strategy. 
9. CLIMATE CHANGE 
(a) Opportunity for verbal updates on community based initiatives 
There were no verbal updates proved under this item. 
(b) Climate Change - A Climate Change Strategy 
Consideration was given to a report providing an update on the
Community Planning Partnership’s Climate Change Strategy. It was noted
that the Project Manager was seeking further recommendations for
groups to engage with and to inform of further development of the action
plan. 
Decision 
The Bute and Cowal Area Community Planning Group:- 
1. noted the approach and status of the project outlined within the
report; 
2. agreed to provide comments and feedback to the Project Manager
(andy@actnow.org.uk) following the meeting; and 
3. agreed that future climate change items be included earlier on the
agenda. 
(Reference: Report by Chair of the Climate Change Action Group dated
30 April 2025, submitted) 
10. COMMUNITY FOCUS 
(a) Dunoon Youth Football League 
The Group were advised that no representative was available from the
Dunoon Youth Football League for this meeting. It was highlighted that the
Football League have their festival weekend scheduled for 17-18 May
Page 16

Page 17

which is advertised on their website. 
Decision 
The Bute and Cowal Area Community Planning Group noted that the
Dunoon Youth Football League would present to a future meeting of the
Group. 
(Reference: Verbal update by the Community Development Team) 
11. ASPIRING PLACES PORTAL 
The Group gave consideration to a presentation by the Area Plans team in relation to
the Council’s Aspiring Places; Community Project in Argyll and Bute which was
launched in March 2025. 
Aspiring Places is a new digital space for community groups and organisations
across Argyll and Bute to share information about projects that they would like to
carry out. The vision is to create a vibrant bank of community projects that supports
joint working and connects community groups to the Community led local
development fund and potential external funding opportunities. 
The presentation provided background information to the platform which is more
sustainable, dynamic and an efficient way to not only capture community projects,
but allow community groups to use the digital space as a ‘shop window’ to attract
funders and promote collaboration. 
Decision 
The Bute and Cowal Area Community Planning Group considered and noted the
contents of the presentation. 
(Reference: Verbal update and Presentation by the Area Plans Team) 
12. DATE OF NEXT MEETING 
The Group noted that the next meeting of the Bute and Cowal Area Community
Planning Group would take place on Tuesday 12 August 2025. 
Page 17

Page 18

This page is intentionally left blank

Page 19

MINUTES of MEETING of COWAL TRANSPORT FORUM held BY MICROSOFT TEAMS 
on FRIDAY, 9 MAY 2025 
Present: Daniel Hampsey  (Chair) 
Councillor William Sinclair
Councillor Ross Moreland
Stuart McLean, Committee Manager
Alister McLudie, Western Ferries
Allan Comrie, Strathclyde Passenger Transport SPT
Andrew Boyd, Transport Scotland
David Clough, Dunoon Community Council
Gordon Ross, Western Ferries
Ian Woodcock, Transport Scotland
Neil Stewart, West Coast Motors
Victoria Shaw, CalMac
Iain Slorach, CalMac
Kirsty Taylor-Walsh, CalMac
Catriona Renfrew, Kilfinnan Community Council
Jim Fairlie, MSP Minister for Agriculture and Connectivity
Laurence Kennedy, Scottish Government 
Attending: Anthony Galloway, Local Democracy Reporter 
The Chair welcomed Jim Fairlie, MSP Minister for Agriculture and Connectivity to the
meeting. 
Mr Fairlie provided the background to the community needs based assessment and
the decision to remove 3 sailings for the Dunoon-Gourock route. Mr Fairlie added
that this decision was reached following careful consideration and engagement and
that the revisions being made will ensure that the service remains efficient and
effective. Mr Fairlie advised that consultation will now be undertaken to determine
which of the 3 sailings will be removed from the timetable and encouraged all
stakeholders to engage with this process. 
A full discussion was had on the implications and the next steps of the change to the
service with Partners requesting that the following points be taken into consideration: 
- Half hourly sailings would be many customers preference, thereby reducing
confusion.
- Any future service must be more reliable and efficient than it currently is. 
- One of the vessels should be identified as a back-up and should only be used
in the event that the primary vessel is unable to operate and/or is undergoing
maintenance.
- Cognisance should be given to peak and off-peak provision. 
- Integration with other transport providers should be enhanced. 
- The consultation should be broad, with community groups that have
undertaken similar studies invited to contribute. 
1. APOLOGIES FOR ABSENCE 
Page 19 Agenda Item 3c

Page 20

The Chair welcomed everyone to the meeting. 
Apologies for absence were intimated on behalf of Councillors Gordon Blair and Audrey
Forrest, Sophie Marshall and Bart Simonis Police Scotland, Ewan Tait, Scotrail, Graham
Revill, Hunters Quay Community Council, Simon Stuart, Timber Transport and Michael
Breslin. 
Forum members raised concerns that there was no representative from Argyll and Bute
Councils Roads Department. The Chair agreed to liaise with Roads and Infrastructure
Services regarding their representation at future meetings of the Cowal Transport Forum. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. MINUTES 
The minutes of the meeting of the Cowal Transport Forum held on Wednesday 29
January 2025 were approved as a correct record. 
The Chair highlighted that since the last meeting of the Forum there will be a wider
discussion on the community needs assessment which will be reported back to the
Forum. The Chair noted the pilot for ticketing at the Dunoon-Gourock service and
welcomed the announcements of two new vessels being procured by Western Ferries. 
4. POLICE SCOTLAND 
The Forum were provided with a written update from Inspector Bart Simonis on the
ongoing work of the service and the priorities for the Cowal, Bute and Helensburgh
areas. 
Outcome 
The Forum noted the written update from Police Scotland. 
(Reference: Report by Police Scotland, submitted) 
5. FERRIES UPDATE 
Page 20

Page 21

Opportunity for verbal updates by Cowal Transport Forum Members 
Western Ferries 
Gordon Ross updated for Forum on dredging work being undertaken which had made a
difference and that the service had not been affected. He further advised that
improvements will be made to the berthing facility at Kilmun to coincide with the delivery
of 2 new vessels. 
Outcome 
The Forum noted the update from Western Ferries. 
CalMac 
Victoria Shaw advised that the MV Argyll Flyer being unavailable has had a significant
impact on operation, investigations around the issues faced by the vessel are ongoing
and updates will be provided as soon as possible. The ticketing trial on the Gourock –
Dunoon service is due to begin on Monday, 12 May for two weeks, which will provide
more front line support for customers. 
Iain Slorach advised of the formation of a ferry sub-group, which the Forum supported. 
Outcome 
The Forum noted the update from CalMac. 
6. PUBLIC TRANSPORT 
Page 21

Page 22

Opportunity for verbal updates by Cowal Transport Forum Members 
West Coast Motors 
Neil Stewart provided an update on works being undertaken including the parking ban,
Dunoon Grammar School capacity and the change of the app provider. He advised there
had been an overall 5% drop in passengers due to changes in the CalMac timetables. 
A question was raised about Council bus signage at the Dunoon ferry terminal,
specifically that some routes were not being listed. The Chair advised that he would
liaise with Argyll and Bute Councils Roads Department regarding this. 
Outcome 
The Forum noted the update from West Coast Motors. 
SPT 
Allan Comrie provided an update on the current activities and that all services were
operating as usual. 
Outcome 
The Forum noted the update from SPT. 
7. ROADS UPDATE 
The Chair advised that there was no representative from the Roads Department present
but he would take back any questions received and update the Forum accordingly. 
There were no questions raised. 
8. TRANSPORT SCOTLAND 
Page 22

Page 23

Ian Woodcock proved the Forum with a verbal update highlighting recent activities
including: 
- The motorcycle safety guidance document for local authorities and prime
motorcycle sites will be sign posted and chevrons marked. 
- Ongoing works at the Rest and Be Thankful specifically the installation of debris
flow netting, the A83 will be closed over the next few months with dates being
finalised shortly. 
- Other works – A82, 5 weeks of drainage works under temporary traffic
management;  third party works at Arrochar for 6 weeks with 3-way set of traffic
lights; A78 current works at Inverkip and the Bowling round about resurfacing. 
David Clough, Dunoon Community Council raised a concern around the awarding of a
contract by the Ferry Directort. Mr Clough appreciated that Mr Woodcock was not in a
position to comment on this and that he would continue to pursue this matter. 
Outcome 
The Forum noted the update from Transport Scotland. 
9. TIMBER TRANSPORT GROUP 
Timber Transport 
The Chair advised that Simon Stuart had submitted his apologies for the meeting but he
would take back any questions received and update the Forum accordingly. 
There were no questions raised. 
10. ANY OTHER COMPETENT BUSINESS 
Gordon Ross asked a question on the Scottish Governments new free travel for under 22
year olds and why Dunoon had missed out. 
The Chair advised that the new travel scheme was for inter-island travels but he would
raise Mr Ross’s concerns with the Scottish Government. 
Gordon Ross asked a further question on the islands connectivity plan and that there
was no reference to shore side infrastructure improvements associated with the Gourock
to Dunoon routes. 
The Chair advised that he would raise this with parliamentarians, specifically those
representing Argyll and Bute and Inverclyde. 
11. DATE OF NEXT MEETING 
Page 23

Page 24

The Chair thanked everyone in attendance at the meeting and the Forum noted that the
next meeting would be held during the week beginning 6 October 2025. 
Page 24

Page 25

Argyll
Community
Housing
Association
Update to Argyll and Bute Council
Bute and Cowal Area Committee
Michelle Mundie
Chief Executive
3rd June 2025
Page 25
Agenda Item
5

Page 26

Energy Efficiency
• 55 Solar Photovoltaic panels installed in ACHA
properties in Bute and Cowal. Up to 50% saving
on energy costs depending on usage.
• 26 Air Source Heat Pump systems installed.
Tenants have provided information which
demonstrates approximately 30% saving on
energy costs.
478 tenants from the Bute and Cowal
area have received £1,181,990.42 from
ACHA’s welfare rights service
What we have achieved 2024/25
Adaptations
68 adaptations carried out in Bute and
Cowal with a further 22 to be completed.
Anti Social Behaviour
• 59 Anti Social Behaviour cases
closed
• 28 of these are in the Bute and
Cowal area
2 3
Repairs
• 19,567repairs completed
• 5,746 of these repairs are in the
Bute and Cowal area
New Tenancies
• 416 new tenancies;
• 140 of these are in the Bute and
Cowal area
Estate
Walkabouts
Residents liaise with ACHA’s
Housing and Property Services
teams
Review of ACHA’s Sheltered
Housing and Factoring Services
being carried out
Welfare Rights
Sheltered Housing/
Factoring
Future
Development
Proposals to be
developed for 2 sites
ACHA have acquired in
Dunoon - up to 41 units
Page 26

Page 27

Performance Benchmarking
SHN
Benchmarking
2023/24
Overall Satisfaction
ACHA: 89.84%
Scottish Average: 84.01%
ACHA: 90.84%
Scottish Average: 81.59%
ACHA: 2.18 per 100 homes
Scottish Average: 6.59 per 100 homes
ACHA: 2.74 per 100 homes
Scottish Average: 7.51 per 100 homes
ACHA: 0.11%
Scottish Average: 4.43%
ACHA: 92.03%
Scottish Average: 86.49%
Rent ArrearsValue for Money
Anti Social Behaviour Cases
Complaints
Quality of Home Page 27

Page 28

High Street/Russell Street, Rothesay
• The Net Zero project in High Street/Russell
Street, Rothesay was completed in November
2024. 
• This  involved complete refurbishment and re-
design of the buildings, which now have 
modern open plan living layouts, new
kitchens, bathrooms, windows, external wall
insulation, solar panels and air source heat
pumps.
• This brought some previously difficult to let
properties back into the letting pool and all the
properties were successfully re-let .
Page 28

Page 29

Finbracken, Sandbank
• Extensive works have been carried out  at
Finbracken in Sandbank, Cowal through our
exemplar estate projects.
• The work involved replacing windows, balcony
railings, fitting of external wall insulation and
work carried out to the bin stores.
• Also landscaping work and replanting an
avenue of trees.
• Unfortunately two historical, distressed trees
which commemorated the birth of local  twin
sisters had to be felled. However a bench has
been made from the wood and installed and
there is to be a plaque fitted and a ceremony
held in the near future.
Page 29

Page 30

Ferfadd Court, Rothesay
• The old communal heating and hot water
system has been replaced with a quantum
storage heating system.
• Each of the 33 sheltered housing properties
now has an individual direct feed hot water
system.
• Alongside the replacement heating system, a
full rewire of the building has been carried out.
Page 30

Page 31

Working with
our
Communities
Community
Action Fund
ACHA School
Award Scheme
13 schools in Argyll and Bute have received an
award of up to £1,000.  3 of the schools are
located in the Bute and Cowal area: Sandbank
Primary, Innellan Primary and Toward Primary.
New Parliament
Place Allotments
Community
Action Fund
38 registered charities have received an
award of up to £500.  4 of the groups are
based in the Bute and Cowal area; Dunoon
Burgh Hall Trust, Dunoon Amateur Boxing
Club, Kilmun Hall and Recreation
Association and Colintraive Village Hall.
ACHA School
Awards Scheme
Page 31

Page 32

ACHA is changing….. an update on our plans
New Vision, Mission
and Values
A new corporate plan
A new target operating model
A values pilot
New job roles
A new staffing structure
Page 32

Page 33

ACHA office, Fairmile, Dunoon
• ACHA’s staff in Cowal have moved into new
office facilities at Fairmile.
• The new office provides modern, open-plan
working facilities in the Digital Dock.
• Board room/training suite in the Mylne Room.
Page 33

Page 34

This page is intentionally left blank

Page 35

ARGYLL AND BUTE COUNCIL SECONDARY SCHOOL ATTAINMENT REPORT
AREA COMMITTEE 
Dunoon Grammar School 
3rd June 2025
Page 35
Agenda Item
6a

Page 36

School information/school context – include SIMD etc. 
Dunoon Grammar School has a very long and distinguished history spanning over 350 years of growth, of which high standards of academic and personal
development have been the hallmarks. 
Dunoon Grammar School is a mixed sex, interdenominational school which caters for pupils aged from eleven to eighteen years of age and serves the area
of Cowal. Catchment is rural in nature and includes two large primary schools in Dunoon and 9 other primary schools. 
There are 748 pupils on the school roll. The teaching staff compliment is 58.2FTE. The Senior Leadership Team comprises of the Head Teacher and four
Depute Head Teachers. There are 8 Principal Teachers Curriculum and 4 Heads of House (Guidance). We also have a Principal Teacher of Behaviour and
Learning. 
In our school we are committed to providing appropriate learning opportunities for the young people, both in and out with school, and to secure positive
destinations for all of our students. This is done in partnership with parents/carers and takes into account the needs of our young people. 
Our SIMD ranges from SIMD1 to SIMD 6. 
The pupil equity funding for session 2024-25 was £91,875. We have used this money to build on the excellent work that we started in our wellbeing hub.
Our Family Wellbeing officer has supported families and young people. She regularly visits homes to support Young people who find it difficult to attend
school.  We have also employed a youth worker, a life coach and introduced a number of Principal Teacher posts to support improvement. These Principal
teachers include, PT DYW, PT Learning and Teaching and PT Raising attainment.  Our Principal Teacher Raising Attainment has introduced a more robust
Tracking and monitoring system to support staff’s understanding of progress. We have also just recently appointed a Principal Teacher of Broad General
Education and Whole school achievement. 
We are currently reviewing our vision, values and aims. The process will involve all our partners, staff, pupils, parents, partners and community. 
Page 36

Page 37

Section 1 S3 ACEL Attainment in Literacy and Numeracy   
School Level % Achieved
Reading Writing L&T Literacy Numeracy
Dunoon Grammar School Third Level or better 85.4 81.5 84.7 81.5 98.1
Argyll & Bute Third Level or better 91.9 87.5 89.8 86.3 92.1
Dunoon Grammar School Fourth Level 56.7 56.7 56.7 56.1 50.3
Argyll & Bute Fourth Level 67.2 65.6 69.6 64.1 64.4 
S3 ACEL – Gaelic (if applicable) 
School Level
% Achieved
Gaelic
Reading
Gaelic
Writing
Gaelic
L&T  
Dunoon Grammar School Third Level or better 75 100 100   
Dunoon Grammar School Fourth Level 50 50 50   
Page 37

Page 38

Evaluative Comment – Areas of Strength in BGE Attainment:
• It is clear that staff judgement in 2023 at 4th level literacy was too low – young people achieving a level 5 in 2024 increased by 34%. Work
has been carried out with the department to address this. 
• Attainment in Literacy and Numeracy improved compared to 2023. 
• Moderation work has been carried out in departments and across the cluster in order to ensure more robust teacher judgements. A clearer
understanding of a 3rd level and 4th has been established.
• Attainment in Gaelic is strong. 
Evaluative Comment – Areas for Development in BGE Attainment:
• Introduction of Standardised Assessments at the end of S2 to help identify pupils who may require further support to make improvements
in their literacy and numeracy in order to achieve Level 3 or better.
• Introduction of Principal Teacher BGE Attainment and Achievement to support raising attainment in this area.
• Further separation of BGE Attainment and Senior Phase Attainment on SLT remits - dedicated DHTs now driving Raising Attainment
agenda/actions for each respective phase in line with School Improvement Plan.
• Authority led Quality Assurance/Moderation between English and Mathematics and Cluster Primary Schools – help to ensure shared
understanding of levels and ensure assessment of these levels is appropriate/robust. 
Section 2 National Qualifications 2024 – Percentage of Awards – A-C and A-D 
Page 38

Page 39

Evaluative Comment – Areas of Strength 
• Pass rates at A-C and A-D are above the Argyll and Bute percentage and the National percentage
Page 39

Page 40

• A-C and A-D pass rates for S4 N5 for 2024 remain largely in line with that of 2019 and the average number of N5 presentations per pupil
is at a 4 year high of 4.72 – showing that progress has been made towards raising the rate of N5 presentations per pupil without causing
A-D pass rates to fall. DGS presentation rate at S4 N5 are higher than that of the LA
• S5 Higher 2024 results have improved.- Percentage of A passes at S5 Higher have increased and the percentage of C and D passes has
also fallen, while No Awards remain the same
• S6 Adv. Higher 2024 results have improved. – Percentage of A passes has increased, while percentage of C and D passes as well as No
Awards have fallen 
Evaluative Comment – Areas for Development
The S4 National 5 A pass percentage in 2024 was down by 7.33% when compared against that of 2019. In aim of raising the A pass percentage
going forward, the Study Support offering has been made more formal, with a formal record of attendance and incentives for pupils being
introduced. Additionally, teaching staff are developing an increased awareness of learner performance across the curriculum through effective
Whole School Tracking and Monitoring – empowering practitioners as a tool to increase pupil accountability/drive learners to perform in their
subject. Moreover, introduction of formal assessments at the end of S3 to provide pupils with experience of “exam setting” to raise resilience and
robustness so they are better prepared to undertake N5 study in S4.
Though S5 Higher presentations per pupil rate remains above 2.5 (at 2.58), it has fallen when compared with the previous year (high of 2.89) and
is currently below the LA figure (2.68). Movement towards 3 Higher presentations per pupil is desired. Therefore, there has been greater focus
on maximising initial presentations at Higher for 24/25 by ensuring course choices are more heavily based on/reflect predicted S4 N5
achievement.
Presentations in S6, both an N5 and Higher, have declined since 2020, with Higher presentations being 0.17 below that of the LA. This will be in
part a result of increasing the number of Pass/Fail qualification offered at L5 and L6 in the Senior Phase and Adv. Higher presentations per pupil
rising from 0.44 to 0.59 (whilst A-D pass rate only fell from 100% to 94%). However, a concerted effort must be made to ensure S6 pupils are
selecting Highers during the options process and that they are ultimately presented for the final exam (this can be impacted by the arrival of
university offers). 
Section 3 Insight Data
Page 40

Page 41

What is Insight Scotland?
Insight is a professional tool, aimed at teachers and other staff. It is used to help secondary schools and local authorities identify areas of success and where
improvements can be made for pupils in the senior phase. The dashboard has four measures: 
• Improving Attainment in Literacy and Numeracy (presented below as separate Literacy and Numeracy graphs)
• Increasing Post-School Participation
• Improving Attainment for All
• Attainment Versus Deprivation 
The school’s data below is compared to what is termed The Virtual Comparator. The virtual comparator consists of a sample group of school leavers from
schools in other local authorities who have similar characteristics to the school leavers from the school in question. This allows the most accurate and
meaningful comparison of attainment data. 
3a Improving Attainment in Literacy and Numeracy 
Page 41

Page 42

Evaluative Comment – Areas of strength
• The percentage of leavers achieving level 5 literacy has increased from 2023
• The percentage of leavers achieving level 5 numeracy has increased from 2023. 
Page 42

Page 43

Evaluative Comment – Areas for Development 
• The percentage of young people achieving level 4 literacy and numeracy requires to be improved. 
• To ensure all S4 leavers attain strong outcomes in Literacy and Numeracy, we will develop a clear strategy for capturing evidence. Our Literacy and
Numeracy department will review and refine their Broad General Education courses and timelines to ensure appropriate progress, improve the quality
of tracking data, and deepen our understanding of attainment standards. Further work has been planned with our Cluster Primary Schools and
collaborative moderation events have been planned.
• Our attainment in Literacy and Numeracy has decreased from 2022. We have developed an action plan to ensure improvement. We have now
implemented earlier banking of literacy and numeracy awards (start of S3) and an improved tracking and monitoring system of each pupil’s achieved
level of literacy and numeracy.  We have also incorporated an ‘upgrade’ opportunity to ensure that pupils’ achieved level is maximised. 
3b Increased post-school participation 
Evaluative Comment – Areas of Strength 
Page 43

Page 44

• The percentage of school leavers entering a positive and sustained destination remains consistent with the 2022/2023 figures
• In 2023/24, the proportion of school leavers achieving a positive destination represents the third highest figure over the past five years.
• The introduction of MCR Pathways has had a highly positive impact. Mentors are supporting our young people to adopt a forward-looking
mindset and consider wider opportunities for their future. 
Evaluative Comment – Areas for Development 
• We have introduced a new approach to work placements and work experience, designed to better reflect each young person’s individual
interests. Our Principal Teacher of Developing the Young Workforce (DYW) is monitoring progress across the school and ensuring that
Guidance staff are kept informed of each pupil’s development.
• New destination tracking procedures have been introduced. 
• We are currently reviewing our Broad General Education (BGE) to place a stronger emphasis on skills development. This shift aims to
raise young people’s aspirations and broaden their ambitions for the future.
• The PT DYW has also created a new pathways programme in partnership with local primary schools. As part of this initiative, staff and
DYW ambassadors will visit P6 and P7 pupils to discuss future pathways, using resources such as “My World of Work.” The programme is
designed to encourage primary pupils to start thinking about their future early, helping to raise their aspirations. 
3c Improving attainment for all 
Page 44

Page 45

Page 45

Page 46

Evaluative Comment – Areas of Strength 
Page 46

Page 47

• The average number of tariff points for the middle 60% has increased from 2023. However, it is 2nd lowest percentage in the last 5 years. 
• The average number of tariff points for the top 20% has increased from 2023 and is the 2nd highest in the last 5 years. 
• The average total tariff points increased from 2023. However, it is the 2nd lowest in the last 5 years.
• The average total tariff points for the middle 60% are in line with Argyll and Bute, Virtual Comparator, Northern Alliance and the National
establishment 
Evaluative Comment – Areas for Development 
• The average total tariff points for the lowest 20% is the lowest for the last 5 years. 
• The average total tariff points for the lowest 20% and Highest 20% are below Argyll and Bute, Virtual Comparator, Northern Alliance and
the National establishment
• We have introduced new wider achievement accreditation courses at level 5 and level 6. 
• All S4 pupils now do the Level 5 Wellbeing award 
• Introduction of S3 and S4 wider achievement period
• New S4 pupils will also complete Level 5 Mental Health and Wellbeing award
• We are reviewing our curriculum offer to ensure we are meeting the need of all young people. 
• New courses introduced for session 2024-25
- Level 5 Wellbeing Award 
- Level 6 Statistics
- Level 5 and Level 6 Personal Finance Award 
- Level 6 Media 
- Level 6 STEM Ambassadors 
- Level 6 Lab Skills 
- Level Team Sports 
3d Attainment versus Deprivation 
Page 47

Page 48

Page 48

Page 49

Page 49

Page 50

Evaluative Comment 
• In SIMD 1-6 Dunoon Grammar School is below the Virtual comparator when using Total tariff points
• In SIMD 1-6 the gap closes between Dunoon Grammar School and the virtual comparator when using complementary tariff points 
• In SIMD 1, 3, 4, 5 & 6 Dunoon Grammar School is above or in line with the National establishment
• In SIMD 2 Dunoon Grammar School is below the National establishment 
Page 50

Page 51

Section 4 Wider Achievement Qualifications 
National Certificates; Higher National Certificates; Scottish Vocational Qualifications;  National Progression Awards;
Skills for Work qualifications; Foundation Apprenticeships; Scottish Baccalaureate
Overall evaluative comment/narrative on Wider Achievement Qualifications in your school: 
NPA – Computer games Development – 7 young people 
E-sports qualification 
Hairdressing National 4 and National 5 – 19 young people 
Early Education and Childcare National 4 – 10 passed 
NPA Beauty Skills – 5 passed 
NPA make up skills – 5 passed 
Higher Beauty – 6 passed 
Higher Psychology 
Higher Sociology
FA childcare – 1 pupil
NPA Sport leaders – 13 pupils
NPA Team sports – 12 pupils
NPA Individual sports – 13 pupils 
SCQF level 7 referee – 5 pupils 
SCQF level 7 – Swimming Teaching qualification – 6 pupils 
Level 4 work placement  - 64 pupils – this will increase 
A large number of pupil achieved a Saltire award 
We have introduced a number of new qualifications for 2024-25, DJ skills, Personal finance, STEM ambassador, Laboratory
skills, creative industries, STACS award, Arabic, Barista Skills and Fitness and Exercise 
We are discussing how best to re-introduce duke of Edinburgh as an extra-curricular club. 
Section 5 Equity and Attainment – Evaluation of Key Factors 
Page 51

Page 52

Factor in attainment 
Attendance School Ave. Att. 23-24: 87.9% (87.3% in Argyll and Bute)
Persistent Absence: 44.6% (44.9% in Argyll and Bute) 
Exclusion No. of Exclusion Incidents 23-24: 26
No. of Exclusion Openings 23-24:  74
Rate per 1000 pupils: 34.9 (18.5 Argyll and Bute)
Additional
Support Needs
Census 2023: 48% (40% in Argyll and Bute) 
SIMD
Census 2023: 34% from Deciles 1-3 (18% in Argyll and Bute)
Free School
Meal
Entitlement
Census 2023: 26% (14% Argyll and Bute)
Care
Experienced
(and previously
Care
Experienced)
Census 2023: 5.5% (41 pupils)
English as
Additional
Language
Census 2023: 5.1%
Other (give
details) 
Pupil Equity Funding 
Page 52

Page 53

Our Family liaison officer has been working closely with targeted families and those young people who find it difficult attending school. We
allocated a teacher who works with the family liaison officer and makes visits home to support young people’ learning. The family liaise officer
also provides our breakfast club. This is open to all young people however, we also target pupils. The Family liaison officer has also been
supporting our Head of House team with attendance. She has been making contact with young people and their parents to discuss attendance
patterns. 
Our Youth worker has been working with vulnerable young people. These young people are targeted by the Head of house team. There has
been a marked increase in confidence of the young people the Youth Worker has been supporting. 
The Life coach works in the school for 2 day a week. She works with targeted groups and individual young people. Majority if these young
people reside in SIMD 1-3. She supports them with their learning but also with their resilience. She has been working with our care
experienced young people. 
This is the 2nd year of the MCR pathways programme this session. This has had a big impact on the young people involved. Our mentors are
reporting a marked improvement in the young people’ confidence and targets. Our young people have commented on how much they
appreciate being listened to. They feel valued. 
We have three Principal Teacher PEF, Raising Attainment, Learning and Teaching and DYW. All Three Principal Teachers have been driving
forward who school priorities. This year we also introduced  a Principal Teacher of BGE attainment and whole school achievement. The focus
of this role has been to work with the English and Maths department on Literacy and Numeracy, tracking and monitoring of the BGE and
coordinating the whole school approach to achievement. 
Section 6 Other information 
Page 53

Page 54

Dunoon Grammar School has had another positive and productive year. The school continues to develop confidence in our young people and
ensure and develop them both academically and socially. 
This year our community projects include – 
• We continue to work with our community partners on a number of projects 
- Dunoon Burgh Hall 
- Dunoon Film festival 
- Our Local primary schools 
- Dunoon Museum 
- Historic Kilmun 
- Learning Centre activities
- The Dunoon Project
- 
• We continue to work with our National partners, The Wood Foundation and Apps for Good. 
• We continue to offer a wide range of Extra Curricular activities and school trips
• A group of our young people took part in a trip to Tanzania this session. This is our 3rd trip to Tanzania. This year we have invited to
staff from Tanzania schools to visit Dunoon Grammar School. We are also planning to organise an adult trip this year. This will involve
school staff, parents/carers and members of the community. 
• We continue to offer our exchange programme to France and Germany. 
Page 54

Page 55

ARGYLL AND BUTE COUNCIL SECONDARY SCHOOL ATTAINMENT REPORT
AREA COMMITTEE 
SCHOOL BADGE       
Rothesay Academy 
3rd June 2025 
Page 55
Agenda Item
6b

Page 56

School information/school context – include SIMD etc. 
Rothesay Joint Campus is a fully comprehensive, non-denominational 3-18 learning establishment which serves the local
communities on the Isle of Bute. The campus, which is located in the town of Rothesay, was opened in 2007 and is made up of
Rothesay Pre 5 Early Years Unit, Rothesay Primary School and Rothesay Academy.  Other primary schools in the cluster who feed into
Rothesay Academy are North Bute Primary School and St Andrew’s (RC) Primary School.  
In recent years we have played a major role in the resettlement of Syrian, Sudanese, Ukrainian and Vietnamese refugee
families.  This has been a very successful and rewarding initiative for our school community.  The school has been at the centre of
recovery and support for our families and our focus is on nurture and support.
The social/economic demographic of the communities which we serve is mixed and the table below indicates the range of Scottish
Index of Multiple Deprivation (SIMD) deciles of our young people: 
In addition, the percentage of young people accessing Free Meal Entitlement (FME) is 29.1% for Rothesay Academy and 32.5% for
Rothesay Primary which is above the national average. 
Our School Values are:
Respect, Kindness, Aspiration, Achievement &
Equality.
We are a UNICEF Rights Respecting School and
have recently achieved our Silver Award. 
SIMD Range  Percentage of Pupils 
Deciles 1 - 4 65% (RAcad)     72.5% (RPS)
Deciles 5 –8 26.1% (RAcad)  20.2% (RPS)
Deciles 9 - 10 8.4% (RAcad)    7.3% (RPS)    
Page 56

Page 57

Section 1 S3 ACEL Attainment in Literacy and Numeracy   
School Level % Achieved
Reading Writing L&T Literacy Numeracy
Rothesay Academy Third Level or better 78.4 74.5 78.4 66.7 82.4
Argyll & Bute Third Level or better 91.9 87.5 89.8 86.3 92.1
Rothesay Academy Fourth Level 41.2 35.3 49.0 35.3 43.1
Argyll & Bute Fourth Level 67.2 65.6 69.6 64.1 64.4 
Evaluative Comment – Areas for Development in BGE Attainment: 
Page 57

Page 58

Year group has 40% FME compared with whole school FME of 27%.
Year group has 63.8% of pupils with ASN (last session school as a whole was 32.3% ASN)
Issue of attendance impeding progress for a significant minority of year group 
Numeracy
Level 3 Numeracy below authority average  
Level 4 Numeracy below authority average 
• Continued focus on introducing more challenging work in S3 as well as earlier and continued assessment for numeracy award in S3 in order to focus
learners on strengths and areas for development.  
• SEAL Training (Recovery programme) for targeted learners.
• Working with primary to ensure greater progression pathways.
• Much more robust tracking and monitoring at every tracking period (S1-3) including focus on SIMD
• Discrete numeracy period in S1 & S2 to build skills
Literacy
Level 3 Literacy – all aspects below authority average
Level 4 Literacy – all aspects below authority average, increase on last session across all areas (L&T: +14%, R: + 7.7%, W 9.5%)
• Moderation and a re-focus on understanding of attainment of a level.
• Formalised assessment calendar for BGE including assessment across other curricular areas
• Much more robust tracking and monitoring at every tracking period including focus on SIMD
• More focus on interventions in BGE and measuring their impact
• Discrete literacy periods in S1&2 to build skills
• More focus on whole school literacy 
Section 2 National Qualifications 2024 – Percentage of Awards – A-C and A-D
Page 58

Page 59

Percentage of awards
Percentage pass rate at N5 was particularly disappointing in all year groups.  
We have a positive presentation policy and it is clear that we need to revise aspects of this.
Page 59

Page 60

A-D passes at all levels are showing that we are not getting enough pupils “over the line” at A-C.
We had an increased number of pupils sitting Adv Higher this year and some lost motivation once they had unconditional acceptance from university. This has
led to a decrease in percentage pass rates at A-C and A-D. 
Areas for development
Review of all tracking and monitoring systems to ensure earlier interventions.
Review of option choices on offer in Senior Phase.  
Increased expectations of learners at all levels.
Continued relentless monitoring of attendance.
Training to refresh approaches in learning and teaching through Bruce Robertson’s “Power Up Your Pedagogy”. 
Section 3 Insight Data 
What is Insight Scotland?
Insight is a professional tool, aimed at teachers and other staff. It is used to help secondary schools and local authorities identify areas of success and where
improvements can be made for pupils in the senior phase. The dashboard has four measures:
Page 60

Page 61

• Improving Attainment in Literacy and Numeracy (presented below as separate Literacy and Numeracy graphs)
• Increasing Post-School Participation
• Improving Attainment for All
• Attainment Versus Deprivation 
The school’s data below is compared to what is termed The Virtual Comparator. The virtual comparator consists of a sample group of school leavers from
schools in other local authorities who have similar characteristics to the school leavers from the school in question. This allows the most accurate and
meaningful comparison of attainment data. 
3a Improving Attainment in Literacy and Numeracy 
Page 61

Page 62

Page 62

Page 63

Page 63

Page 64

Evaluative Comment – Areas of Strength 
Level 4 & Level 5 Literacy has remained broadly in line with the VC
Level 5 Numeracy has improved by 20.2% over the past 2 years and is now in line with the VC 
Evaluative Comment – Areas for Development 
Continue to make bespoke arrangements for pupils who experience emotionally based school avoidance where appropriate.
Ensure by October of S4 that evidence of literacy and numeracy levels is recorded for as many pupils as possible.
Reviewed tracking and monitoring and earlier intervention.
Ensure targeted N4 pupils in S4 are achieving SCQF 5 in literacy.  
Target S4 leavers to ensure as many as possible achieve SCQF 5 in literacy.
Reviewed tracking and monitoring and earlier intervention. 
3b Increased post-school participation 
Page 64

Page 65

Evaluative Comment – Areas of Strength 
We remain in line with the VC and have been either in line or above the VC for the past 5 years. 
Evaluative Comment – Areas for Development 
Page 65

Page 66

We will continue to develop positive relationships with local employers.
We will continue to support learners with college and university applications and attendance at open days
We will continue to develop a wide range of pupil pathways so that all learners are able to fulfil their potential. 
3c Improving attainment for all 
Page 66

Page 67

Page 67

Page 68

Evaluative Comment – Areas of Strength 
Middle 60% of learners have improved over past two years
Highest 20% of learners now broadly in line with VC
Significant improvement in total tariff points on last year and is much closer to VC.
Page 68

Page 69

Evaluative Comment – Areas for Development 
A small group of learners in S4 who have left with no or very few qualifications due to significant attendance issues.  We will continue to target
support for attendance.  We have seen improvements overall in our attendance but for a small group in S4 (over the past two sessions) this has
proved challenging. 
All staff are engaging in training to refresh approaches to Learning & Teaching and this will have a positive effect on pupil engagement. 
We will continue to improve tracking and monitoring of all learners to ensure early intervention 
We will continue to build on our current pathways so that our curriculum offer enables all pupils to achieve. 
Page 69

Page 70

3d Attainment versus Deprivation 
Page 70

Page 71

Evaluative Comment – Areas of Strength 
SIMD 1, 3 and 5 pupils performed better than VC 
Evaluative Comment – Areas for Development 
Improve tracking & monitoring to target learners who are struggling
Continue to explore new pathways and qualifications for learners
Small number of SIMD 9 pupils have ASN and this is skewing performance. 
Section 4 Wider Achievement Qualifications 
National Certificates; Higher National Certificates; Scottish Vocational Qualifications;  National Progression Awards;
Skills for Work qualifications; Foundation Apprenticeships; Scottish Baccalaureate
Overall evaluative comment/narrative on Wider Achievement Qualifications in your school: 
• In session 2023-24 our learners in our Senior Phase achieved over 180 wider achievement awards.  This was an increase
from 50 in the previous session.  Most of these awards were at level 5 or level 6.   
• We have now built opportunities for wider achievement into our senior curriculum and this is leading to an increase in
achievement. 
• We are continually enhancing our pathways and will be introducing NPA in Horticulture as well as National 5 Laboratory
Skills next session. 
• We continue to work with Argyll College very successfully to offer a small number of courses in Sport & Recreation and
Childcare Education 
• We continue to offer and NPA in Beauty which is very popular and for which we employ our own tutor. 
Section 5 Equity and Attainment – Evaluation of Key Factors
Page 71

Page 72

Factor in attainment 
Attendance School Ave. Att. 23/24: 87.2% (87.3% in Argyll and Bute)
Persistent Absence: 51% (45% in Argyll and Bute)
Exclusion No. of Exclusion Incidents 23/24: 2
No. of Exclusion Openings 23/24: 10
Rate per 1000 pupils: 7.2 (18.5 in Argyll and Bute)
Additional
Support Needs
Census 2023: 41% (40% in Argyll and Bute) 
SIMD
Census 2023: 73% of pupils in Deciles 1-3 (18% in Argyll and Bute)
Free School
Meal
Entitlement
Census 2023: 22% (14% in Argyll and Bute)
Care
Experienced
(and previously
Care
Experienced)
Census 2023: 5.1% (14 pupils)
English as
Additional
Language
Census 2023: 5.4%
Other (give
details) 
Pupil Equity Funding 
Page 72

Page 73

Impact of PEF on closing the attainment gap 
Our use of PEF monies to provide additional nurture through The Anchor, a Nurture Assistant, 0.2FTE of our Family Liaison, Health &
Wellbeing Officer and Breakfast Club is improving outcomes for targeted children. 
Almost all learners involved in these initiatives have improved or maintained their attendance and behaviour.  This is having a positive effect on
their learning and attainment. 
All learners in S3 who have been targeted have achieved level 3 or 4 in Literacy and Numeracy. 
Section 6 Other information 
Our pupils are currently rehearsing for our 3rd RJC school show in 3 years.  The cast of Matilda will be entertaining our community in mid-June. 
We achieved our Silver Rights Respecting School Award this session.  We were the first Joint Campus in Argyll & Bute to do so.  This means
that as a school community we are Rights Aware. 
We are one of only 4 schools in Scotland piloting the Film & Screen Curriculum.  One of our S6 pupils was chosen to be Screen Scotland’s first
ever Young & Ambassador for the Film & Screen Curriculum.  We have 3 staff across campus trained in Film & Screen Education.  This was a
major undertaking and they all passed with flying colours! 
Our pupils enjoyed a variety of trips this session, most notably, the Geography Yorkshire Dales trip, the Loch Eil Outward Bound trips, the
Manchester Football Trip.  We are also re-introducing our Ski Trip to Italy for next session. 
Page 73

Page 74

Our S3 and S4 pupils organised a Christmas Hamper food collection and donated 52 Christmas Hampers to be distributed by social work to
our most vulnerable families. 
Page 74

Page 75

1   
Bute and Cowal Area Committee     
Date of Meeting:  3 June 2025 
Title of Report:   Health & Social Care Partnership - Performance Report – FQ3 2024/25  
(October – December) 
Presented by:     Charlotte Craig – Interim Head of Strategic Planning, Performance &
Technology    
The Board is asked to:
• Acknowledge performance for FQ3 2024/25 (October - December) 
• Acknowledge performance update on the National Health & Wellbeing Outcomes
and Ministerial Steering Group Integration Indicators (Appendix 1) 
• Note Delayed Discharge Sitrep as of 06 January 2025 (Appendix 2) 
EXECUTIVE SUMMARY 
This report details performance for the Financial Quarter (FQ) 3 2024/25 (October - December), the
performance outputs are taken from the Integrated Performance Management Framework (IPMF)
Reporting Dashboard with the focus on twelve key service areas. Overall performance for FQ3 notes
42 of 84 measures reporting as on target (50%). 
The report details performance against each of the service areas and the 84 supporting Key
Performance Indicators. National Health & Wellbeing Indicators performance is included alongside
latest performance from the National Delayed Discharge Sitrep. The use of the new performance
Dashboard within SharePoint is designed to offer a more focused approach to the access and
analysis of data, offering scope for self-service.  
In consideration of the report the committee is reminded of the role of the Clinical and Care
Governance Committee in providing more in depth scrutiny of performance.  To ensure timely
consideration for the IJB a high level report has been presented to the IJB ahead of this with update
to follow in the next minute. 
2. RECOMENDATIONS
The committee are asked to acknowledge current FQ3 24/25 performance. 
3. DETAIL OF REPORT
The report details the HSCP (Health and Social Care Partnership) performance for FQ 3 2024/25
(October - December) highlighting key performance trends across the 84 KPIs (Key Performance
Indicators). The latest performance against the National Health and Wellbeing Outcomes Indicators
is reported (Appendix 1). Also included is the latest national update on Delayed Discharges
Page 75 Agenda Item 7

Page 76

2
(Appendix 2).   
4. RELEVANT DATA & INDICATORS 
4.1 FQ3 2024/25 (October - December) Performance Summary         
Overall performance for FQ3 notes that 84 KPI’s are scoring against target, with 42 (50%) reporting
as on-track. This is a decrease of 8% from FQ2 position, where 49 KPI were on track (58%). The
KPI’s report performance against the target and include the target, actual and variance and is a mix
of both quantitative and qualitative indicators. The use of the green, amber and red graphics within
the Dashboard is used to give an overview of the HSCP’s total performance for each of the twelve
services and 84 KPI’s. The use of only green and red for the KPI’s is used to focus delivery with
regards to sustaining performance on or above target.   
4.2 Analysis of Key Performance  
This analysis identifies performance across the 12 service reporting categories within the Integrated
Performance Management Framework (IPMF). 
4.2.1 Children & Families  
Performance across 7 KPIs, Children & Families and Justice notes 4 (57%) on track, with 4 (43%)
off track, against the targets set for Q3 24/25. This is consistent with 57% noted as on track in
FQ2.    
Performance on or above target: 
• The percentage of Child Protection Register (CPR) cases that have an allocated Social
Worker remains on target at 100% for FQ3, with no change noted from FQ2 position.
Page 76

Page 77

3
• The number of teams that have delivered 75% or more of the Universal Health Visiting
Pathway (UHVP) reports 87% for FQ3, up from 78% FQ2. 
• FQ3 Number of Public Sector staff who have received at least basic training in how to
identify and respond to women and children affected by Violence Against Women &
Girls reports cumulative 250 against cumulative target of 90. 
• Percentage of Criminal Justice social work reports submitted 2 days before court reports
is noted at 91% in FQ3, against 90% target and an increase from 82% reported in FQ2 
Performance below target & areas for improvement: 
• The percentage of Child Protection Planning Meetings (CPPM's) held within 28 days of
the initial referral reports 33% in FQ3 against 90% target and increase from 17% noted
in FQ2.
• Mental Health Services (CAMHS) children and young people seen within 18 weeks of
referral reports 39% FQ3 against 85% target and a decrease from 73% reported in FQ2.
• The number of statutory individual Health Assessments commenced within four weeks
of coming into care in FQ3 reports 75% down from 100% for FQ2 
4.2.2 Telecare and Digital
Performance across 13 Key Performance Indicators (KPIs) for Strategic Planning, Performance &
Technology Services shows 4 KPIs (31%) on track, with 9 KPIs (69%) reported as off track against
the targets set for FQ3 24/25. Performance on track reports a decrease of 7% from the reported
FQ2 24/25 position (38%) 
It should be acknowledged that nationally waiting time breaches are measured against a zero target.
Local targets have been set to monitor progress and improvements to reduce the number of patients
on waiting lists across varied health specialties.   
Performance on or above target:   
• The implementation of Just Checking activity monitoring equipment was successfully
completed in 8 homes, down slightly from 9 in FQ2 but remains above the target (7) for
FQ3. 
• Digital blood pressure monitoring in Primary Care continues to be rolled out, with 79
unique patients using the service by FQ3 against a target of 42, consistent with FQ2
levels.
• Currently, 45% of telecare clients have enhanced packages, which are on target and an
increase from 42% noted in FQ2. Further work is needed to accurately track this metric. 
• The e-health department resolved 100% of IT support requests during Q3, up from 99%
in FQ2. 
Performance below target & areas for improvement:   
• FQ3 reported 169 new clients to Telecare, a 23% decrease compared to the previous
quarter (219) and below the target of 200.
• Progress in the digitalisation of telecare equipment has increased by 11% to 65% for
FQ3, however this is below the 70% target set for the end of the period.
• Consultations delivered via Near Me have continued to decline, from 999 in FQ2 to 888
in FQ3, against the quarterly target of 1025, showing no growth.
• The number of telecare clients overdue for their annual review has decreased to 51%,
below the 50% target. Work is continuing to improve data quality around this measure. 
Page 77

Page 78

4
• There were zero Silvercloud referrals reported in FQ3, a fall from 57 in FQ2 against the
quarterly target of 60.
• 96% of FOI requests were completed within the statutory timescale, against 100% and
down from 100% noted in FQ2.
• Waiting times for cancer appointments at 31 and 62 days reported 15 cases, an
increase from 12 in FQ2 against a target of zero.
• New outpatient waiting times breaches over 12 weeks were noted at 49%, compared to
the 46% target, no change from FQ2.
• Outpatient long waiting times (over 52 weeks) were noted at 4.8%, an increase from
3.3% in FQ2 and above the target of 2.8%. 
4.2.3 Primary Care
Performance across 10 Key Performance Indicators (KPIs) for Primary Care shows 6 KPIs (60%)
on track, with 4 KPIs (40%) reported as off track against the targets set for FQ3 24/25.  This is a
reported decrease of 10% from 70% on track in FQ2 24/25. 
Performance on or above target: 
• 81% of children who received Fluoride Varnish treatment did not require further dental
treatment, consistent with FQ2 levels.
• 54% of eligible residents have so far received their Winter Covid 19 booster. This is 7%
higher than the national average and up from 4% noted at FQ2 end.
• Across the HSCP GP practices operated the duration of FQ3 without resorting to
contingency measures. Decease from 55 instances noted in FQ2.
• GP practices remained at level zero during FQ3 resulting in no reduction in services
provided. 
• 4.5% of consultations by GPs and other HSCW within the primary care setting were
done digitally, meeting the target set (4.5%)
• Primary Care Out-of-Hours Services covered 50% of all recorded out of hour
consultations during FQ3, an increase from 46% in FQ 2 and exceeding their 45%
target.    
Performance below target & areas for improvement: 
• 2 GP practices were returned to HSCP Control during FQ3, above a zero target and an
increase from FQ2 (0).
• 93% of children at 12 months of age received their 6 in 1 vaccination missing the 95%
national target, down from 96% reported at FQ2. (data for this indicator is 1 quarter
behind due to availability of statistics) 
• The Oral Health Improvement Team only managed to deliver 94% of their planned
activity, down from 95% in FQ2 and against a target of 100%.  
• HSCP Dental services utilised 61% of clinic appointments, missing their 90% target.
This is an improved position from 48% noted in FQ2. 
4.2.4 Public Health
Performance across 5 Key Performance Indicators (KPIs) for Public Health shows 4 KPIs (80%) on
track against the targets set for FQ3 24/25. Performance on track reports a decrease of 20% from
the reported FQ2 24/25 position (100%). 
Performance on or above target: 
Page 78

Page 79

5
  
• Increase the monthly number of quit dates set, supported by NHS smoking cessation
advisors or jointly through shared care with pharmacy, by people in the most deprived
40% areas in Argyll. Performance this quarter has significantly exceeded the target, with
28 quit dates achieved against a target of 10. Whilst significantly above target it shows a
3% decrease compared to FQ2.   
• Increase the number of engagement activities delivered in communities and supported
through Living Well Networks.  Performance continues to be above target, with an actual
of 29 against a target of 20.  This represents a 12% increase compared to FQ2. 
• Increase the number of referrals to community link workers supported by “We Are with
You”. Performance this quarter achieved approximately 44% above the target, with an
actual performance of 145 against a target of 101.  The actual number of referrals is
above target but 32% less than FQ2. 
• Number of instances working with Scottish Government or National Agencies on
National Strategy and Policy Development. This is a new measure for 24/25 with a
target initially set as 1.  FQ3 noted 13 instances of working with Scottish Government or
National Agencies on National Strategy and Policy development.  
Performance below target & areas for improvement: 
• Increase the number of people in Argyll and Bute attending training in the following
areas, Money Counts, Behaviour Change, Mental Health and Suicide Prevention. 
The rolling target from 23/24 continues into 24/25, with the expectation of 17 additional
clients each quarter.  In FQ3 we fell 4% short of our target with 114 attendances, against
a target of 119.    
4.2.5 Finance 
Performance across 6 KPIs for Financial services notes 1 (17%) on track, with 5 (83%) off track
against the targets set for Q3 24/25. This is a reported decrease of 66% from FQ2, where 5 (83%)
of KPIs were on track.    
Performance on or above target: 
• Older People External Residential actual spend reports 95%, this is 5% below projected
target in FQ3, with variance of 23% from the FQ2 position. 
Performance below target & areas for improvement: 
• Costs for Hospital Delayed Discharges in FQ3 report £453,500 (43%) over the target of
£317,000 and an increase from £306,500 in FQ2. 
• GP prescribing expenditure notes actual spend being £126,000 (0.6%) over the
projected spending target in FQ3. This is an improved position from FQ2, where
performance was noted as 2% over the target.  
• Agency and Locum staffing expenditure reports a reduction of 1%, failing to meet the
target reduction of 10%. However, this is an improvement on the FQ2 position, where a
6% increase was recorded.
• Older People Internal Residential actual spend notes being over projected target by 8%
for FQ3. This has increased from FQ2 position where 83% actual was noted.   
• FQ3 Older People Homecare actual spend reports being 4% above the projected target.
This is an increase from the FQ2 position, where actual was below projected 92%   
Page 79

Page 80

6
4.2.6 Carers
Performance across 4 Key Performance Indicators (KPIs) for Carers shows 3 KPIs (75%) on track,
with 1 KPI (25%) reported as off track against the targets set for FQ3 24/25. Performance on track
is consistent with the reported FQ2 24/25 position. 
Performance on or above target:
• The number of Unpaid Carers Supported across A&B’s Carers Centres continues to be
over the target of 3000 per quarter, with a slight increase to 3483 (4%) noted from
previous FQ2.   
• The ACSP reviews, which now include welfare contacts, are well above target of 700
per quarter with 1739 achieved in FQ3 compared to 1396 in FQ2. 
• Young Carer Statements completed in FQ3 notes 53, is up from 35 recorded in FQ2 and
remains above the target of 4 
Performance below target & areas for improvement: 
• The number of Adult Carer Support Plans completed saw a significant increase this
quarter (+11%), rising from 114 to 127 - just below the target of 133. 
4.2.7 Allied Health Professionals 
Performance across 7 Key Performance Indicators (KPIs) for Allied Health Professionals shows 4
KPIs (57%) on track, with 3 KPIs (43%) reported as off track against the targets set for FQ3 24/25.
Performance on track reports a decrease of 14% from the reported FQ2 24/25 position (71%). 
It should be acknowledged that nationally waiting time breaches are measured against a zero target.
Local targets have been set to monitor progress and improvements to reduce the number of patients
on waiting lists across varied health specialties.    
Performance on or above target: 
• MSK Outpatient Referral waits breaching >4 weeks are slightly up in FQ3 to 1029 (+6%)
and meeting target of 1120.
• Outpatients waiting over 12 weeks for AHP services continue their trend downwards in
FQ3 – with a reported total of 467 against the target of 500.
• Community Patient Discharges saw a slight decline in FQ3, dropping from 2,034 to
2,027, while still exceeding the target of 1,632. 
• The percentage of New versus Return Outpatient Physio AHP Referrals remains above
the 30% target, with 31% noted in FQ3. 
Performance below target & areas for improvement: 
• AHP Priority 1&2 referrals breaching > 4 weeks in FQ2 reported 55 against a target of
48.
• Priority 3 and 4 Community Patient Referrals breaching over 12 weeks have increased
quarter on quarter, with FQ3 reporting 770 against a target of 400, up 35% from 558
noted in FQ2. 
Page 80

Page 81

7
• AHP Outpatient Completed Waits decreased by 10% in FQ3, with 929 reported, just
missing the target of 945. However, this remains part of an overall upward trend over
the past year. 
4.2.8 Delayed Discharges 
Performance across 6 Key Performance Indicators (KPIs) for Delayed Discharges shows 2 KPI
(33%) on track, with 4 KPIs (67%) reported as off track against the targets set for FQ3 24/25.
Performance on track reports a decrease of 50% from the reported FQ2 24/25 position (83%)
For FY 2024/25 Delayed Discharges KPIs, we use a count at the end of quarter census point instead
of full month data, as this aligns better with national reporting. It should be acknowledged nationally
Delayed Discharges are measured against a zero target. Local targets have been set to monitor
progress and improvements to reduce the number of patients showing as a Delayed Discharge.   
Performance on or above target: 
• Reduce the Number of people delayed in hospital with AWI code at Monthly Census
Point. Performance was above target having achieved actual of 4 against a maximum
target of 6. In this quarter, the number of people delayed with AWI code recorded
remained at 3 in October and November and increased to 4 in December.
• At the end of Q3, the number of people delayed in hospital awaiting assessment (Codes
11A and 11B) was 5, which is 14% of census clients, against a target of 10.  The target
was based on the average for the previous four quarters of 23/24, which ranged from 9
to 11.   This is a noted reduction of 29% from FQ2 position which reported 7. 
Performance below target & areas for improvement: 
• The overall number of people delayed in hospital at Monthly Census Point as at the end
of Q3 was 35, against the target of 31. This reflects an increase of 13% compared to
FQ2 position (31). The target was set based on the average over the last four quarters
of 23/24, where client numbers ranged between 29 and 34.
• At the end of Q3 census point, the overall length of stay in a hospital (Delayed
Discharge Bed Days) at Monthly Census Point was 907 against the target of 634. This
represents an increase of 48% with 613 recorded in FQ2. The target was set based on
the average bed days over the past four quarters of 23/24, which ranged from 598 to
695.
• The number of people delayed awaiting a Care Home Placement was 10, compared to
a target of 4, 150% over the target. The actual number of people waiting has increased
by 900% (1 to 10) from FQ2 to FQ3. The target was set based on the average from the
previous four quarters of 23/24, which ranged from 0-5. 
•  At the end of FQ3, the number of people delayed in hospital awaiting care at home
availability was 15, representing 43% of census clients, compared to a target of 12. The
target was based on the average of the last four quarters of 23/24, which ranged from 8
to 14. This has decreased by 25% compared to FQ2 position (20). 
Page 81

Page 82

8
4.2.9 Adult Social Care 
Performance across 4 Key Performance Indicators (KPIs) for Adult Social Care shows 3 KPIs (75%)
on track, with 1 KPI (25%) reported as off track against the targets set for FQ3 24/25.  Performance
on track reports an increase of 25% from the reported FQ2 24/25 position (50%). 
Performance on or above target: 
• Reduce the number of Unplanned Admissions to A&B hospitals directly from a care
home has remained steady at 16 in both FQ2 and FQ3, which is below the target of 36.
• Increasing the occupancy rates across A&B Care Homes has remained steady at 96%
across FQ1, FQ2 and FQ3 and 2024/25. This KPI is now measured against available
places (previously all empty beds).
• The FQ3 performance was looking to reduce the value of assessed unmet need for care
at home. FQ3 actual was £14,718.26, which is £1,960.78 (12%) below the target. 
Target is set at previous quarter’s value.  
Performance below target & areas for improvement:  
• Increasing the % of Older People who had their homecare monitoring review completed
within 6 months was noted at 40% for FQ3, against a target of 49%, which is 18% below
target.  Compared to FQ2, where the actual was 37%, this represents a 3% increase
(40%).  
4.2.10 Community Hospitals 
Performance across 5 Key Performance Indicators (KPIs) for Community Hospitals shows 4 KPIs
(80%) on track, with 1 KPI (20%) reported as off track against the targets set for FQ3 24/25. 
Performance on track has remained consistent, with an 80% track record across both FQ2 and
FQ3. 
Performance on or above target: 
• The average length of stay for inpatients in A&B Community Hospitals was reduced to
7.4 days across the quarter, against the target of 7.8 days. This represents a 4%
improvement compared to FQ2, where the average length of stay was 7.7 days. 
• A&E attendances meeting the 4 hrs wait target reached 95.1%, exceeding the 95%
target by 0.1%. This is a slight reduction of 2% from FQ2, where performance was noted
as 97.1%.  
• Maintain A&B Community Hospitals Bed occupancy rates below 80% target.  Bed
occupancy rates remained well below target at 70.6% for FQ3, marking a slight increase
of 1.3% from 69.3% in FQ2.    
• Reduce the number of falls being reported in a Community Hospital setting in A&B. In
FQ2, we reported 38 falls, well below the target of 54. This showed an increase of 1 fall
from FQ2 (3%). 
Performance below target & areas for improvement: 
• Reduce the rate of unplanned admissions to Community Hospitals for 65+ population.
This KPI reported 490 admissions, 8% above the target of 452 for FQ3. This represents
approximately 1% increase compared to FQ2. 
Page 82

Page 83

9 
4.2.11 Adults with Long Term Conditions / Adult Support & Protection / Alcohol Drugs
Partnership 
Performance across 8 Key Performance Indicators (KPIs) for Adults with Long Term Conditions
Services shows 3 KPIs (38%) on track, with 5 KPIs (62%) reported as off track against the targets
set for FQ3 24/25. There is no change from FQ2 24/25. 
It should be acknowledged that nationally waiting time breaches for New Mental Health Outpatients
(12 weeks) and Psychological Therapy (18 Weeks) are measured against a zero target. Local
targets have been set to monitor progress and improvements to reduce the number of patients on
waiting lists across varied health specialties 
Performance on or above target: 
• 10 Adults are on the dynamic support register with a category red or amber status, in
line with Q3 target of 10, and down from 12 reported in FQ2. 
• FQ3 noted 30 Adults waiting for a psychological therapy service against the target of
175 or fewer, and a reduction from 40 in the previous quarter. 
• 90.8% of individuals referred to Alcohol and Drug treatment services were seen within
the target waiting period, above the 90% target and an increase from 89.6% at FQ2.   
Performance below target & areas for improvement: 
• 12% of Adults with a Learning Disability were reported as overdue their annual review,
up from 7% in FQ2 and above the 3% target.
• 502 Adults were waiting for a Mental Health outpatient service, missing the target of 390
or less. And in increase of 13% from FQ2 position (446).
• FQ3 noted 30% of Adult Support and Protection 'duty to inquire' procedures were
completed within the 5 working day target, below 70% target and no change from FQ2.
• Only 30% of Adult Support and Protection inquiries requiring investigative powers were
completed within the 15 working day target (70%), down from 55% reported in FQ2.
• 79% of Case Conferences began within 20 days of referral or within 12 weeks of the
initial conference for review, an improvement on previous FQ2 (53%), but below the
100% target. 
4.2.12 Rural General Hospitals (Lorn & Island Hospital) 
Performance across 9 Key Performance Indicators (KPIs) for Rural General Hospitals (LIH) shows
4 KPIs (44%) on track, with 5 KPIs (56%) reported as off track against the targets set for FQ3 24/25.
 
Performance on track reports an 11% increase from the reported FQ2 position. 
Performance on or above target: 
• Reduce the rate of unplanned admissions to LIH 65+ population. FQ3 performance
noted the actual number of unplanned admissions was 322, down 16% from 383 in
FQ2, meeting the target set of 345.  
• Reduce the number of LIH A&E Attendances that result in an unplanned admission. The
FQ3 performance for reducing unplanned admission from A&E attendances was on
target with both actual and target 19.2%.  This is a decrease of approx. 1% from FQ2,
where the rate was 19.8% and off target. 
Page 83

Page 84

10
• Reduce the number of falls being reported in a hospital setting in LIH. FQ3 performance
noted the actual number of falls was 26 against a target of 26. This reflects a 21%
reduction in falls from FQ2, where 33 Falls were reported. 
• Reduce the number of instances of tissue viability in Lorn & Islands Hospital. The target
was to reduce the number of tissue viability instances to no more than 4. FQ3
performance on actual instances was 2, a reduction of 4 (67%) reported in FQ2. 
Performance below target & areas for improvement: 
• Reduce the total number of unplanned bed days in LIH. The actual number of
unplanned bed days reported was 3327, 4 above the target of 3323, based on the 23/24
average.  This represents a 12% increase from FQ2 of 2969. 
• Reduce the Average Length of Stay for inpatients in LIH. FQ3 Performance noted we
achieved an actual rate of 5.3, against the target of 4.8. This is up 26% from 4.2 noted in
FQ2.  
• Maintain LIH Bed Occupancy Rates below 90% target. FQ3 performance noted an
actual rate of 92.4%, approx. 7% increase from 85.8% noted at FQ2. 
• Reduce the number of medication errors in LIH. The quarterly indicative target was set
at no more than 6 per reporting period, 6 based on 2023/24 average.  In FQ3 we noted
an actual of 12, an increase of 3 (33%) from FQ2.   
4.2.13 National Health & Wellbeing Outcome Indicators & Ministerial Steering Group
Integration Indicators 
The National Health and Wellbeing Outcomes provide a strategic framework for the planning and
delivery of health and social care services. This suite of outcomes serves to focus on improving the
experiences and quality of services for people using those services, carers, and their families. These
indicators form the basis of the annual reporting requirement for Health and Social Care
Partnerships across Scotland.   
The national indicators will be updated and reported within A&B HSCP’s Integrated Performance
Management Framework to provide the national performance position alongside the local service
Key Performance Indicators suite. 
The latest data in relation to 26 HWBOI and MSG Indicators reports 50% on track, with 13 on track
and 13 off track. An overview of A&B HSCP’s latest performance against the 26 measures is
reported in Appendix 1. It should be noted that reporting periods vary across the suite of national
indicator measures, with some measures reported quarterly affected by national reporting data lag. 
Page 84

Page 85

11
5. CONTRIBUTION TO STRATEGIC PRIORITIES
The monitoring and reporting against Key Performance Indicators using the Integrated Performance
Management Framework and Dashboard ensures the HSCP can deliver against key strategic
priorities. This in-turn is aligned with the Strategic Plan and key objectives. 
6. GOVERNANCE IMPLICATIONS
6.1 Financial Impact
Financial performance is evidenced within the IPMF Dashboard ensuring best value as well as
evidencing the impact and performance against organisational budget savings. 
6.2 Staff Governance
Key performance indicators within the IPMF ensure that staff governance requirements continue to
be progressed and developed include health and safety, wellbeing and new service redesign and
working practices. 
6.3 Care and Clinical Governance
Clinical Governance and patient safety remain at the core of prioritised service delivery against the  
new IPMF Dashboard and National Health & Wellbeing Outcomes Indicators. The new governance
structure supporting the IPMF ensures that the Clinical & Care Governance Committee remain
central to performance improvement. The development of the IPMF is focussed on moving away
from previous traditional styles of reporting to a fully collaborative approach with Head of Service
and Service Lead commentary. 
7. PROFESSIONAL ADVISORY 
Data used within the performance dashboard is fully accessible in SharePoint with data trends and
forecasting are identified to give wider strategic context. This provides the HSCP professional
advisors with self –service performance information to inform their role in maintaining professional
standards and outcomes. 
8. EQUALITY & DIVERSITY IMPLICATIONS
The Integrated Performance Management Framework captures relevant indicators used to inform
the HSCP E&D work.
8.1 PROTECTED CHARACTERISTICS
Performance detailed within this report acknowledges the rights of the Child (UNCRC), Islands.
Fairer Scotland, Socio-economic Duty, Equalities - protected characteristics.  
9. GENERAL DATA PROTECTION PRINCIPLES COMPLIANCE 
Data use and sharing within this report and IPMF performance dashboard is covered within the
Argyll and Bute Council & NHS Highland Data Sharing Agreement 
10. RISK ASSESSMENT
Risks and mitigations associated with performance data sources and reporting are managed and
identified within the monthly Performance & Improvement Team- Work Plan. 
Page 85

Page 86

12
10.1 STRATEGIC, OPERATIONAL OR CLIMATE RISK
Performance reports are used by operational management to identify service delivery risk and to
inform mitigation action accordingly.
11. PUBLIC & USER INVOLVEMENT & ENGAGEMENT
Performance reporting is available for the public via Argyll and Bute Council and NHS Highland
websites. The IPMF dashboard utilises SharePoint to support manager and staff access across the
HSCP.
12. CONCLUSION 
The committee is asked to consider and acknowledge FQ3 2024/25 (July - September) performance
as detailed in the IPMF Dashboard. 
The committee should also note that the 2025-26 review of KPI’s has commenced.   
13. DIRECTIONS 
Directions
required to
Council, NHS
Board or
both.
Directions to: tick
No Directions required x
Argyll & Bute Council 
NHS Highland Health Board 
Argyll & Bute Council and NHS Highland Health Board 
14. PREVIOUS REVIEW OF THE REPORT 
Meeting  Title of report Date Output (if relevant)
Integration
Joint Board
Health & Social Care
Partnership -
Performance Report –
FQ3 2024/25   (October
– December)
26/03/2025 
Clinical and
Care
Governance
Committee
Health & Social Care
Partnership -
Performance Report –
FQ3 2024/25   (October
– December)
1/05/2025 
REPORT AUTHOR AND CONTACT 
Author Name: Douglas Hunter- Senior Manager Performance & Improvement
Email: douglas.hunter@argyll-bute.gov.uk 
Page 86

Page 87

13
Appendix 1 – HWBOI & MSG Integration Indicators. 
Core Suite of Integration Indicators 
Data notes 67% (6 of 9) HWBOI Outcomes measures reporting as above the national Scotland Rate. It is worth noting that performance will be influenced and vary in line with the total number
of respondents participating in this voluntary survey. As such, caution should be noted with regards to previous comparison and trends 
Page 87

Page 88

14
HWBOI - Performance 
Data notes 55.5% (5 of 9) HWBOI Performance measures reporting as above the national Scotland Rate. *Indicators 12, 13, 14, 15, 16, 18 Calendar year 2023 is used here as a proxy for 2023/24
due to the national data for 2023/24 being incomplete. This is in line with guidance issued by Public Health Scotland which was communicated to all Health and Social Care Partnerships. Using
more complete calendar year data for 2023 should improve the consistency of reporting between Health and Social Care Partnerships. 
Page 88

Page 89

15
Ministerial Steering Group Integration Indicators 
Data notes 25% (2of 8) MSG Indicators reporting as above the national Scotland rate. MSG Indicators data notes that all MSG measures have increased in the last reporting year. Activity around
Emergency Admissions, Unplanned Bed Days, A&E attendances and Delayed Discharge Bed Days all noted performance exceeding pre –Covid levels. This highlights the necessity to consider
approaches to alleviate systems pressures around Urgent and Unscheduled Care and expedite hospital flow. 
Page 89

Page 90

16
Appendix 2 - Delayed Discharge Sitrep – 6th January 2025 
Page 90

Page 91

ARGYLL AND BUTE COUNCIL                                    BUTE AND COWAL AREA
COMMITTEE                                                                                                         
ROADS AND INFRASTRUCTURE                          JUNE 2025
SERVICES                     
ROADS AND INFRASTRUCTURE SERVICES UPDATE 
1.0 INTRODUCTION 
1.1 A Roads and Infrastructure standing report was a fixture on Area Committee
agendas throughout the life of the last Council. In the first two rounds of Area
Committee meetings in the new Council feedback was sought on the value of
these updates, and their format and frequency. Generally Members felt having a
standard item was beneficial and it was acknowledged that the Roads and
Infrastructure weekly briefings issued to all members each Friday afternoon
provide for the main sources of live information on current activities. On top of
these briefings there is a bank of resources on the new Member Zone system
which include the weekly briefings, subject specific briefings, ad hoc short
briefings on issues, relevant previous committee reports, operational service
procedures, legislation and Council policies. 
1.2 In the last Council the purpose of these reports was to provide an update on
service activities but since weekly briefings these have largely superseded the
original stated purpose of these reports. 
1.3 On the basis of the above this new format has been agreed through the
December 2022 round of area committees for this standing item. This format
removes duplication for Officers and rather links to existing published
information, with additional updates only in the body of the reports if these are
specifically requested/noted from previous meetings. The report remains as a
standing item and continues to provide the opportunity for Officer engagement at
the committee meetings.   
2.0 RECOMMENDATIONS 
It is recommended that the Area Committee: 
2.1 Note and consider the contents of this report. 
3.0 DETAIL 
3.1 Roads and Infrastructure Services provides Members with weekly briefings on
topical service activities which are all available here.  
Page 91 Agenda Item 8

Page 92

3.2 As part of the resources on the new Member Zone system there are various key
documents available in an online library here. 
3.3 There are also additional online resources covering the streetlighting, footway,
surface dressing and roads reconstruction programmes available on the website
here. 
4.0 CONCLUSION 
4.1 This report provides links to existing published information on service activities
and provides for the opportunity for officer attendance and engagement at
committee meetings. 
5.0 IMPLICATIONS 
5.1 Policy – Roads and Infrastructure work to a number of policies across the range
of service areas. 
5.2 Financial – revenue and capital budgets are in place to deliver projects and
cyclic work. 
5.3  Legal – Roads and Infrastructure Services work to a number of different pieces
of legislation such as the Roads Scotland Act 194 and the Environmental
Protection Act 1990. 
5.4  HR – none known. 
5.5  Fairer Scotland Duty: 
5.5.1   Equalities - protected characteristics – where appropriate EqSEIAs will be
carried out to identify any implications. 
5.5.2   Socio-economic Duty – where appropriate EqSEIAs will be carried out to
identify any implications. 
5.5.3 Islands – where appropriate Island impacts assessments will be carried out to
identify any implications. 
5.6. Climate Change – due regard will be given to climate change with a view to
minimising any climate change impact and these will be considered as and
when they arise. 
5.7  Risk – risk managed through toolbox talks, safety briefings and where
appropriate risk registers – all of the above are monitored through the RIS
leadership and management teams. 
5.8  Customer Service – none known.
Page 92

Page 93

5.9  The Rights of the Child (UNCRC) – none known. 
Executive Director with responsibility for Roads and Infrastructure Services,
Kirsty Flanagan 
Policy Lead for Roads, Transport and Amenity Services, Councillor John
Armour 
May 2025 
For further information contact: 
Stephen Hall, Interim Head of Roads and Infrastructure Services 
Stephen.hall@argyll-bute.gov.uk   
Mark Calder, Project Manager 
mark.calder@argyll-bute.gov.uk 
Page 93

Page 94

This page is intentionally left blank

Page 95

ARGYLL AND BUTE COUNCIL  Bute and Cowal Area Committee 
DEVELOPMENT AND ECONOMIC
GROWTH 
03 June 2025 
Rothesay Pavilion to Albert Pier Active Travel Project: Updated Reports 
1.0 EXECUTIVE SUMMARY 
1.1. This report updates members in relation to amendments made to the “Rothesay,
Pavilion to Albert Pier Car Park Active Travel Project Stage 1&2 Combined,
Options Feasibility Report” and “Rothesay Pavilion to Albert Pier Active Travel
Project Stage 1&2 Combined, Engagement Report” documents for the Rothesay
Pavilion to Albert Pier Active Travel Project as requested by this Committee on
04 March 2025. 
1.2. Further to the work reported on the Rothesay Pavilion to Albert Pier Active Travel
Project and previous work to develop a concept design for a route linking
Rothesay Ferry Terminal to the Rothesay Joint Campus, Officers have submitted
an application to Transport Scotland’s Active Travel Infrastructure Fund 2025/26
for funding to enable these two concept designs to be progressed developed
design stage.  This would be for a T-shaped route linking Rothesay Pavilion,
Rothesay Ferry Terminal, Albert Pier and Rothesay Joint Campus, including other
key destination along the B833 High Street.  The application excludes the
potential extension between Albert Pier and The Glenburn Hotel as this did not
receive community support from those who responded to the consultation. 
1.3. Transport Scotland’s Active Travel Infrastructure Fund requires the submission of
a length and detailed competitive application for each individual project, with every
individual project competing against every other project from across Scotland for
the limited funding available. Is expected the fund be significantly oversubscribed
due to the number of high value projects being progressed across Scotland and
will therefore be highly competitive.  If funding is awarded, it is only for a single
financial year and a new competitive application requires to be submitted each
financial year and compete against all submissions in that year.  As such, there is
no guarantee that this or any other application submitted for projects within Argyll
and Bute will be successful in any given financial year, and having previously
secured funding for a project does not guarantee that funding will be secured for
that project in future years. 
RECOMMENDATIONS 
1.4. It is recommended that the Bute and Cowal members: 
1.4.1. Approve the amendments made to the initial feasibility and concept design reports
for the Rothesay Pavilion to Albert Pier Active Travel Project.
Page 95 Agenda Item 9

Page 96

ARGYLL AND BUTE COUNCIL  Bute and Cowal Area Committee
DEVELOPMENT AND ECONOMIC
GROWTH 
03 June 2025 
Rothesay Pavilion to Albert Pier Active Travel Project: Updated Reports 
2.0 INTRODUCTION 
2.1. This report updates members in relation to amendments made to the “Rothesay,
Pavilion to Albert Pier Car Park Active Travel Project Stage 1&2 Combined,
Options Feasibility Report” and “Rothesay Pavilion to Albert Pier Active Travel
Project Stage 1&2 Combined, Engagement Report” documents for the Rothesay
Pavilion to Albert Pier Active Travel Project as requested by this Committee on
04 March 2025. 
3.0 RECOMMENDATIONS 
3.1. It is recommended that the Bute and Cowal members: 
3.1.1. Approve the amendments made to the initial feasibility and concept design reports
for the Rothesay Pavilion to Albert Pier Active Travel Project. 
4.0 DETAIL 
4.1. Rothesay, Pavilion to Albert Pier Car Park Active Travel Project Stage 1&2
Combined, Options Feasibility Report has been updated to correct the following
points. 
4.1.1. Conservation Area (p.7): updated to reflect Rothesay’s many examples of
Victorian design and conservation. 
4.1.2. Direction of Travel (p.9): traffic survey data referenced in relation to the travel
direction of vehicles leaving the CALMAC Ferry Terminal. 
4.1.3. Land Ownership (p.13): updated to reflect Visit Scotland ownership of the
Discovery Centre and Council ownership of the Putting Greens, Flower Beds
and Promenade. 
4.1.4. Loading and Servicing (p.33): updated to reflect the need for businesses on
Victoria Street (A846) to use frontage access for loading and servicing. 
4.1.5. Parking (p.50): table and associated text updated in line with final concept
design. 
Page 96

Page 97

4.2. Rothesay Pavilion to Albert Pier Active Travel Project Stage 1&2 Combined,
Engagement Report was updated to more accurately reflect the stated position
of Bute Community Council. 
4.3. Further to the work reported on the Rothesay Pavilion to Albert Pier Active Travel
Project and previous work to develop a concept design for a route linking
Rothesay Ferry Terminal to the Rothesay Joint Campus, Officers have submitted
an application to Transport Scotland’s Active Travel Infrastructure Fund 2025/26
for funding to enable these two concept designs to be progressed developed
design stage.  This would be for a T-shaped route linking Rothesay Pavilion,
Rothesay Ferry Terminal, Albert Pier and Rothesay Joint Campus, including other
key destination along the B833 High Street.  The application excludes the
potential extension between Albert Pier and The Glenburn Hotel as this did not
receive community support from those who responded to the consultation. 
4.4. Transport Scotland’s Active Travel Infrastructure Fund requires the submission of
a length and detailed competitive application for each individual project, with every
individual project competing against every other project from across Scotland for
the limited funding available. Is expected the fund be significantly oversubscribed
due to the number of high value projects being progressed across Scotland and
will therefore be highly competitive.  If funding is awarded, it is only for a single
financial year and a new competitive application requires to be submitted each
financial year and compete against all submissions in that year.  As such, there is
no guarantee that this or any other application submitted for projects within Argyll
and Bute will be successful in any given financial year, and having previously
secured funding for a project does not guarantee that funding will be secured for
that project in future years. 
5.0 CONCLUSION 
5.1. The reports submitted to the Bute and Cowal Area Committee on 04 March 2025
have been updated to take account of the amendments requested by this
Committee. 
6.0 IMPLICATIONS 
6.1. Policy Completion of this project will support the Council’s
Outcomes Improvement Plan outcomes 1: Transport
Infrastructure and 3: Community Wellbeing. The project
also supports achievement of the Scottish
Government’s objectives set out in the Cycling Action
Plan for Scotland (CAPS) and Let’s Get Scotland
Walking - The National Walking Strategy.
6.2. Financial The design and construction is planned to be funded by
external funding applications. To date, the Council has
not contributed any funding to design or capital costs.  
There is strong evidence that people who are more
active, for example by walking or cycling, have been
physical and mental health and are less likely to require
Page 97

Page 98

social care services in later life which could result in a
future saving to the Council or HSCP.
6.3. Legal Continued input will be required from Legal Services to
support contractual agreements and Traffic Regulation
Orders (TROs) should these be necessary.
6.4. HR None.
6.5. Fairer Scotland
Duty: 
6.5.1 Equalities Completion of this project will provide opportunities for
all in Rothesay to travel more sustainably and actively
by walking, wheeling and cycling. This is particularly
important to the 41% of households in Rothesay (2022
Census) don’t have access to a motor vehicle.
The route has been designed to be DDA compliant and
will provide a safe and accessible route for those with
mobility aids including wheelchairs and
parents/guardians with a child’s pram or buggy.
6.5.2 Socio-
economic Duty
The route, once completed, will offer residents the
opportunity to choose to travel using active travel, which
are lower cost than alternative modes of transport.  The
route will also improve access to essential services,
retail, leisure and employment opportunities for
residents living along the route, with studies
demonstrating those who travelled actively had a higher
monthly spend in local businesses than those who
travel via motorised transport.
The route will also offer opportunities for individuals to
travel for leisure, again encouraging spend in local
businesses along and connected by the route.
6.5.3 Islands There are no adverse impacts.
6.6. Climate Change  Active Travel is the least carbon intensive mode of
travel.  Providing the opportunity for residents and
visitors to consider an alternative to having to use a
private car to travel for essential journeys will help lower
Argyll and Bute’s carbon footprint.
6.7. Risk There is a reputational risk to the Council if the project
is not completed within a reasonable timeframe.
6.8. Customer
Services  
None.
Page 98

Page 99

6.9. The Rights of the
Child (UNCRC)
Active travel is the most accessible mode of travel to
young people, as it does not have any minimum age
limits, does not require any form of licence, is free to
use and is not tied to any fixed timetable.
All new active travel infrastructure is designed to be
utilised by an unaccompanied 12 year old.
Engagement feedback demonstrates support for the
delivery of the improvements from younger members of
the community. Wider engagement with school pupils
indicates that the majority of pupils across Argyll and
Bute strongly support the provision of new active travel
infrastructure, even where it would adversely impact
other modes of transport. 
Executive Director with the responsibility for Development and Economic
Growth: Kirsty Flanagan 
Policy Lead: Cllr John Armour 
12 May 2025                                                  
For further information contact:  Colin Young   
Strategic Transportation Delivery Officer   
Colin.Young@argyll-bute.gov.uk   
Tel: 01546 604275 
Appendix 1: Rothesay Pavilion to Albert Pier Active Travel Project Stage 1 & 2,
Options Feasibility Report 
Appendix 2: Rothesay Pavilion to Albert Pier Active Travel Project Stage 1 & 2,
Engagement Report
Page 99

Page 100

This page is intentionally left blank

Page 101

Rothesay Pavilion to Albert Pier Active Travel Project
Stage 1&2 Engagement Report 
DATE:  February 2025  REF:  501053 VERSION: FINAL v2
Page 101

Page 102

MARK RINKUS                      
Managing Director                       
Mark.rinkus@connectedtp.com                 
Contents
1 APPROACH TO TRAVEL BEHAVIOUR CHANGE AND COMMUNITY ENGAGEMENT .............................. 1
2 STAGE 1 SURVEY QUESTIONNAIRE RESULTS ................................................................................. 15
3 STAGE 1 COMMUNITY FEEDBACK TOOL (CFT) RESULTS ................................................................. 28
4 STAGE 1 STAKEHOLDER FEEDBACK ................................................................................................ 33
5 STAGE 1 BARRIERS AND OPPORTUNITIES ..................................................................................... 37
6 STAGE 2 – COMMUNITY ENGAGEMENT ........................................................................................... 39
7 STAGE 2 - SURVEY QUESTIONNAIRE RESULTS ............................................................................... 44
8 STAGE 2 - COMMUNITY FEEDBACK TOOL (CFT) RESULTS .............................................................. 64
9 STAGE 2 - STAKEHOLDER FEEDBACK .............................................................................................. 76
10 OUR LESSONS LEARNT .................................................................................................................... 80
APPENDIX A – PROJECT HANDS UP SURVEY RESULTS .............................................................................. 83
APPENDIX B – STAGE 1 AND 2 PUBLIC EVENT ATTENDEES LIST (EVIDENCE) ........................................... 84
APPENDIX C – ISLE OF BUTE NEWS SAMPLE EXTRACTS ............................................................................ 85
APPENDIX D – STAGE 2 SURVEY COMMENTS ............................................................................................. 86 
Page 102

Page 103

STRICTLY CONFIDENTIAL. DO NOT     
2 | P a g e
www.connectedtp.com 
`
APPROACH TO TRAVEL BEHAVIOUR CHANGE AND COMMUNITY ENGAGEMENT
Page 103

Page 104

1 | P a g e
www.connectedtp.com 
1 APPROACH TO TRAVEL BEHAVIOUR CHANGE
AND COMMUNITY ENGAGEMENT
1.1 Relevant Previous Engagement and Consultation
This project seeks to improve pedestrian links into Rothesay Town Centre and to
the Rothesay Pavilion making allowances for potential future active travel
connections.
The study is aligned with the 2017, Rothesay Town Heritage Initiative (THI),
town centre spatial strategy and was identified by the community during 2016
Rethink Rothesay Charrette.
1.2 Stakeholder Mapping
A stakeholder mapping matrix was developed in conjunction with the design
team's relevant experience. The stakeholder mapping aims to identify all
stakeholders to be involved within the study and seeks to quantify each
stakeholders forecast level of interest in the project and likely influence over the
project.
The stakeholder’s mapping process was led by the council and supported by Bute
Community Council using their knowledge of the community.  The stakeholders
were categorised into engagement tiers reflecting their engagement hierarchy
using the mapping matrix (shown opposite). 
The process was collaborative with members of the study steering group
including Bute Community Council helping to define the stakeholder mapping
which evolved through the project lifecycle.
1.3 Engagement Planning
A consultation and engagement plan were developed setting out the studies
stage 1 engagement programme.  The plan was used to identify all proposed
activities, the activity order, potential audience and engagement method.   
Tiered stakeholder mapping developed mapping matrix
Page 104

Page 105

2 | P a g e
www.connectedtp.com 
The plan provides a reference point to ensure that all parties were made aware of
forthcoming actions and had a chance to contribute. This provided the
opportunity to incorporate local knowledge and best practices. The plan identified
a range of activities, which would support comprehensive engagement.  
A summary of the key project engagement activities considered in support of
stage 1 is summarised as follows:
• Study Branding Identity.
• Project Press Release.
• Study Facebook Page.
• Regular Community Visits.
• Study Website Space.
• Engagement with Local Groups.
• Press and Media Support.
• Community Feedback Tool (CFT).
• Schools Engagement.
• Public Community Engagement Event.
• Community Group Meetings.
• Stakeholder Meetings (virtual and face to face). 
A summary of each action plan is provided in the remainder of this chapter. 
1.4 Study Branding / Study Identity
Whilst some active travel studies can benefit from the development of a bespoke
study branded title and logo, it was agreed with the project steering group, at the
project outset that no branding should be applied to this project.  The primary
reason being that Bute Community Council stated that the strong community
ethos in Rothesay would help spread awareness of the project far better than any
bespoke branding would and that the design teams time would be better spent
working with the community.
1.5 Project Press Release (PPR)
Public Notification
The council’s Marketing and Communications (M&C) team was engaged for
support.  The PPR is typically authored by the lead council sponsor in conjunction
with the M&C team.  The resulting PPR would then be circulated internally to all
council departments and issued externally to local press and media outlets.
Councils’ Services Notification
From our experience of other active travel projects, whilst the project is managed
by Argyll and Bute Council (ABC) strategic transportation team, other council
services have an important role to play in enabling active travel projects to
progress. This means it is important that all council services which have a role to
play or interest in the project are informed and engaged from the start of the
project. ABC manage a portfolio of active travel projects, where all projects are
advertised and communicated within and across the council.  The portfolio
Page 105

Page 106

3 | P a g e
www.connectedtp.com 
supports the sharing of project information. The PPR was issued to this portfolio
by ABC.
1.6 Facebook Study Page
As part of the study lifecycle, a bespoke study Facebook Page was developed. 
Information was also posted on the Isle of Bute community Facebook page as
Bute Community Council advised that it has a wide following in the community
and to be the best way to raise awareness of the project.
The design team posted updates that encouraged anyone with an interest in the
study to engage.  The Facebook page was effective with the community engaging
to ask questions throughout the duration of the study.  The page was used as a
direct channel of communication between the design team and the community.
Our study team managed the page to maintain responsiveness.  The page was
used to inform the community of upcoming project events, advertise the team’s
visits to the community and publish our visit itinerary.  The page was also used to
share post visit photos and videos. These were produced to provide a post event
snap-shot of the design team's community interaction and to assist those unable
to attend in person. 
1.7 Community Visits
A key ambition of the project was to ensure the community remained central to
the project and would feel a strong collaboration through ‘face to face’ meetings.  
To achieve this aim, our engagement strategy centred around the design team
being physically present within the community where appropriate.
Using the community Facebook pages, we advertised our visits which included a
day within the community where the design team invited and met with local
groups, school and Bute Community Council. We advertised an itinerary of our
visits providing an opportunity for the community to ‘drop-in’ to our evening
public event.
The Community Facebook page was well used to support the project
Page 106

Page 107

4 | P a g e
www.connectedtp.com 
To support the conversations, we used our digital ‘platform’ of materials.  These
included our pre-prepared constraints mapping used to record ideas and note
comments, barriers and aspirations.  
The plan was then digitised, comments added to our Community Feedback Tool
(CFT) and used as the foundation of the constraints mapping process and route
development. 
The ability to demonstrate to the community how their comments had been
considered is key to developing trust and engagement between the design team
and the community. 
1.8 Study Website 
To support the lifecycle of the project, a study webpage was developed and
hosted within the Connected Transport Planning Ltd (CTP) website. 
The website utilised a project template which was personalised to reflect the
project community using images of Rothesay’s recognisable buildings to assist in
making the space familiar to the community. 
The website provided a key consultation tool for the community to access the
project, designed to be accessible 3 weeks during the consultation time and not
just a ‘bolt on’ point of reference.  The site provided access to all public exhibition
and materials, videos, a range of feedback tools and general project information. 
The site also incorporated a range of functions including a news feed, a Facebook
link and an interactive constraints and option map from where a series of micro-
animations visualisations could also be accessed. These animations were
developed from local photos taken at key points along the study route and
designed to present a vision to the audience that would assist their understanding
of the project’s possible outcomes.
The website enabled those unable to speak with us in-person to view and
comment on any of the materials at any time during the consultation period that
suited them.  Noting the challenges of consultation with a busy community, the
use of the website was a perfect tool to support wide-reaching engagement
within the community. 
Constraint mapping and face – face meetings were constructive
Page 107

Page 108

5 | P a g e
www.connectedtp.com 
The website was open to access by the public for a period of three weeks
following the stage 1 public event.   
1.9 Survey Questionnaire 
A survey questionnaire was developed for the project to provide an opportunity
for the community to share their existing travel habits and existing travel modes,
requirements for a new route, appetite for a route and improvements to active
travel.  The survey was designed using our experience of supporting similar
projects, where we noted that to maximise community feedback, the survey
should be less than 15 questions to minimise survey fatigue and maximise the
chance of receiving complete responses.
Using questions from previous studies as a reference, a bespoke stage 1 survey
questionnaire was developed that would capture key respondent demographics
and sought to learn how the community currently travel and their aspirations for
any future improvement. The survey formed a core component of the
engagement process and was the primary informant of quantitative feedback,
used to support the design process.
To maximise accessibility by all possible user groups and abilities, the survey was
hosted online via the study website using QR codes, website URLs and by contact
email.  The survey also included links to the study website tools such as the
Community Feedback Tool (CFT) which would assist the community in providing
comments by location on a map.
Physical copies of the survey were distributed at various locations including the
Discovery Centre and the co-op noticeboards.  The leaflets were also hand issued
by the design team for a period during a day within the foyer of the larger Co-op
Rothesay Pavilion to Albert Pier website including custom local images
Page 108

Page 109

6 | P a g e
www.connectedtp.com 
supermarket with a number of community representatives supporting wider
distribution.
1.10 Media Support
To raise the community’s general awareness of the study, the local press and
radio stations that cover Rothesay were contacted, the radio station however did
not respond after multiple contact attempts.  The local newspaper in Rothesay;
The Isle of Bute News were happy to assist in promoting awareness for the local
community. The paper prints provided physical and digital advertisement of the
study and was again used to advertise our contact details. ABCs Communications
Team also promoted the study and consultation events on the Council's social
media pages. The community Facebook study group was another source used to
raise the community’s awareness.    
Around 1,500 event advertisement leaflets were distributed to advertise the
community events.   A number of the locations planned to post the flyers either
couldn’t accept the flyer or were unable to display it. Notwithstanding, the flyers
were successfully posted at various locations. These included:
• Various Victoria Street frontage businesses,
• Discovery Centre;
• Local residential properties;
• Co-op;
• Albert Pier businesses;
• Montague Street businesses. 
Flyers were also utilised to communicate a post-event ‘Thank You’ to the
community and to continue the promotion of the digital feedback options offered
via the project website.
This approach meant that those members of the community unable to attend the
advertised event would still have the option to provide feedback or ask the design
team questions, enabling wide-reaching community engagement. 
Advertising leaflets were distributed across the community
Page 109

Page 110

7 | P a g e
www.connectedtp.com 
Argyll Media Coverage of the study helped raise awareness
Page 110

Page 111

8 | P a g e
www.connectedtp.com 
1.11 Event Pop-Up
To raise the community’s awareness of the project and consultation event, the
study team set up a pop-up event within the foyer of the Co-op foot store.  The
event lasted for 3 hours within which the team issued advertising leaflets to
shoppers, to raise awareness of the evenings public event that evening in the
Discovery Centre. 
1.12 Community Feedback Tool (CFT)
Our bespoke engagement platform supports community feedback using a project
map and comment pins. The tool allows comments to be added by location with
comments visible to everyone.  The tool was hosted within the project website
and again used a series of QR codes, website URLs and a named email contact to
support access to other feedback methods and information platforms.  The CFT
was pre-populated with comments noted by the community on the constraint
plan. 
Community Feedback Tool (CFT) allows comments to be added by location
Co-op Pop-up event was used to advertise to the public
Consultation
Page 111

Page 112

9 | P a g e
www.connectedtp.com 
1.13 Schools Engagement
Rothesay Joint Campus
Rothesay Joint Campus catchment for Primary Schools pupils covers the southern
section of Bute including Rothesay, while for Secondary School pupils the school
serves the whole of Bute.  The school role includes 240 primary pupils and 272
secondary pupils.
The design team arranged to meet the Primary 6 pupils (22 pupils) for a 2-hour
period to learn more about the younger generation's views and thoughts
regarding walking and cycling.  The timing of the meeting worked well as it
developed on the classes ongoing theme of problem identification and solutions.  
Following introductions and a project discussion, an interactive Hands-up Survey
(HuS) exercise was undertaken using stickers and travel mode pictures.  The use
of this approach ‘energised’ the primary and secondary school pupils to
participate in the engagement discussion whilst also providing a visual result of
their current travel mode decisions.  The results are shown in Appendix A, with
the majority of the school pupils currently travelling by car or bus to school and
some also stated they walk and no pupils cycle to school.
Following the HuS, the team discussed with the school pupils and teachers how
they would feel about the project improvements.  100% of the pupils and 100%
(1) teacher supported the proposal and agreed it would be a positive addition.  
A summary of the school children’s feedback about what they think is important
in the design is also shown in Appendix A.
With the children in ‘problem-identification mode’, the team utilised our bespoke
primary school asset pack to work with the children to develop their own ideas for
a streetscape and how they would solve the travel issues they had earlier
identified.  The children were then split into two groups and tasked with
developing/exploring ideas using the kit, using drawings and plasticine to help
people and animals move around within the space they had created.  Some very
creative options were explored and positive feedback from parents via the
Facebook Page. 
Feedback from the Rothesay Primary School was positive
Page 112

Page 113

10 | P a g e
www.connectedtp.com 
Engineers of the future? Rothesay Primary made great use of the asset pack to design a streetscape
Page 113

Page 114

11 | P a g e
www.connectedtp.com 
1.14 Parent Teacher Association (PTA)
To maximise the reach of the engagement, the school was approached to
advertise awareness of the project through communication with the local parents
via the Parent Teacher Association (PTA).
1.15 Community Public Event
Following the physical and digital advertisements, an event was hosted by the
design team and ABC within Rothesay Discovery Centre on the 27th of February
2024.  The event opened to the public at 17:30 to 20:45 with the start time set to
maximise attendance. 
10 large format, graphically designed A0 presentation boards were displayed to
provide the audience with a story map of the study, process and consultation
purpose. The event was made more visible to the community through the use of
banners and bunting that was installed.  The team also posted live Facebook
updates.
All attendees were given the choice of completing the project survey
questionnaire or accessing our range of digital tools to provide feedback via QR
codes and URL links.  A key advantage of the digital platform is that the materials
could still be accessed and commented upon at a time that best suited the
consultees. 
This was particularly relevant noting the event took place on a dark winter’s
weekday night with only 61 people managing to meet the team.  A register
extract presented as evidence of those attending the event is shown in Appendix
B. 
Page 114

Page 115

12 | P a g e
www.connectedtp.com 
A weekday dark winter night may have had an adverse impact on the community’s attendance at Stage 1 Public Event
Page 115

Page 116

13 | P a g e
www.connectedtp.com 
1.16 Micro-Visual Transition Animations
To assist the public in understanding how and what an active travel route may
look like within their community a series of transition animations and sketches of
the future were developed.  Each animation was based on a photographed
viewpoint of locations along the route that the public would recognise.
The transitions lasted 10 seconds and showed the transformation of the existing
viewpoint to a proposed future vision.
The animations were hosted as part of the study website experience and
embedded within the large format constraints and options maps. 
1.17 Community Group Meetings
A number of requests to meet were issued to the various local groups within the
community.  
Unfortunately, no responses were received from the groups, noting their
members may still have provided representation through the public survey
questionnaire and online materials. 
Micro-Transition Animations were effective in showing what could be developed
Page 116

Page 117

14 | P a g e
www.connectedtp.com  STAGE 1 SURVEY QUESTIONNAIRE RESULTS
Page 117

Page 118

15 | P a g e
www.connectedtp.com 
2 STAGE 1 SURVEY QUESTIONNAIRE RESULTS
2.1 Sources of Community Feedback
The multiple engagement platforms made available to the community
supported them to engage with the project providing feedback both digitally
and in person.  
A summary of the received feedback by the various engagement platforms
used is summarised in the following table.
Format Responses Received
Survey (Paper) 5
Survey (Digital) 35
Community Feedback Tool (Digital) 5
Total Quantitative Responses 45
Community Public Event Attendees 61
Stakeholder Meetings 0
Total Non-Quantitative Responses 61 
1https://www.citypopulation.de/en/uk/scotland/argyll_and_bute/S19002472__r
othesay/
2.2 Survey Sample Validation
A total of 45 quantitative responses were received from Rothesay’s population of
4,3201 residents.  This represents a sample size of 1% which is lower than the 10
– 15% aimed for.  This equates to a total sample size of 0.7% when considering
the population on the whole of the Isle of Bute which has 6,498 residents
(c.3,328 households)2.   The winter dark nights / changing of the season may
also have impacted on the community’s appetite to attend the public event. 
2 Census 2022
Page 118

Page 119

16 | P a g e
www.connectedtp.com 
2.3 Survey Participant Demographics
2.4 Participant Demographics
This question was asked as it is important to capture the views of people with
varying levels of life experience to assist in the design process.
Of the participant responses received 
• 32% were between 40-59 years old (26% Census 2022).  
• 51% were aged between 60-79 (34% census 2022). 
• 5% were older than 79 (8% census 2022). The results indicate that the survey
was completed by a disproportionately greater number of people between 40
and 79-years-old.  
Only 8% of participants were younger than 40 (33% Census 2022). 3% preferred
not to say how old they were. 
These results highlight that the survey has not captured the views of the younger
community (0% younger than 21-year-old).  
However, the school engagement event was well attended and their views have
been recorded through less prescriptive measures than the survey questionnaire
and are not therefore included in this summary.   
Page 119

Page 120

17 | P a g e
www.connectedtp.com 
2.5 Participants by Gender
Of the total respondents, 54% were women / girls (52% census 2022) and 41%
as men / boys (48% census 2022). No respondents identified as non-binary and
5% of respondents indicated that they would prefer not to say.
Overall, we consider the respondents reflect a reasonable cross-section of the
community however the results are slightly skewed more towards the views of
females, as data from 2022 census demonstrates there are 4% more women
have completed the project survey. 
2.6 Participants Relationship with the Area
Respondents were asked if they lived in Rothesay.  This question was relevant to
ask as it is important to understand if the respondent is responding with longer
term experience of the community or as a tourist/visitor.  100% of respondents
are full time residents in the community and none of the respondents have either
lived in the community historically, or visited at least once a year. 
Page 120

Page 121

18 | P a g e
www.connectedtp.com 
2.7 Participants Health
The majority of participants considered themselves to be able-bodied and did not
have a health or disability that impacted on their everyday mobility (71%). None
of the respondents indicated they did have some health or disability which limits
their day-to-day activity a lot, 21% indicated their disability or health issue would
affect them a little and 3% say they are limited a lot.  5% of respondents
indicated that they would prefer not to say. 
2.8 Participants Health Issues
Of the respondents indicating they did have a health-related disability, 38%
indicated their disability was related to mobility or stamina. 8% of the
respondents say they have breathing or stamina conditions that affect them. 8%
indicated a challenge relating to hearing. 8% respondents have mental health
conditions
0% related to poor vision and 8% indicated they’d prefer not to say.  
These questions are important to ask as they assist the design team in designing
for all user groups, including those with protected characteristics. 
Page 121

Page 122

19 | P a g e
www.connectedtp.com 
2.9 Participants Employment Status
Participants were asked to qualify their employment status. This question was
relevant to ask as the design team will need to consider how the project would
support economic activity and support the movement of people to and from
places of work. 
16% of respondents indicated that they are currently not employed.  24%
indicated they were employed full time and 13% work part time, 13% indicated
they were self-employed and 34% of respondents said they were retired or not
applicable. 
2.10 Results Comparison with 2022 Census 
3 https://www.citypopulation.de/en/uk/scotland/argyll_and_bute/S19002469__rothesay/
To assist in understanding more about how representative the study
demographics are, the survey results were compared with the 2022 Census for
Rothesay3.  The results indicate that the project feedback demographic by age
and all genders is broadly comparable with the census analysis. The community
has a marginally higher proportion of female to males and a mature population
with 23% over 65 years of age.  These results align with the survey feedback
with a slightly more female responses be received than male.  However, the
survey results include a much larger proportion of responses are from more
mature members of the community. 
Overall, the study results are considered to capture a good sample of the
community, capturing the views of both able bodied and those less able, those in
work and those unemployed.
Page 122

Page 123

20 | P a g e
www.connectedtp.com 
2.11 Views on Opportunities and Barriers to Walking, Cycling &
Wheeling?
Participants were asked how often they walked or cycled.  This question is
relevant as it helps us understand the popularity of walking and cycling within the
community at present.  69% of respondents indicate that they walk or cycle daily,
11% roughly 3 times a week, 3% twice a week and 17% roughly once a week. 
These results indicate the community is relatively active and that cycling and
walking is a popular travel mode. 
2.12 Participants Travel Habits Along Victoria Street
Following on from this question, participants were then asked how often they
typically travelled along Victoria Street.
Only 11% of respondents indicated that they travel along the road one day a
week, 11% twice a week, 17% 3 times a week, 56% said they travel along
Victoria Street more than three times a week, and 6% said they don’t travel along
the road.
The results of this question indicate that participants don’t travel along the road
frequently. 
Page 123

Page 124

21 | P a g e
www.connectedtp.com 
2.13 Participants Parking Habits Along Victoria Street
Following on from this question, participants were then asked how often they
park a car along Victoria Street.
3% of respondents indicated that they park a car along Victoria Street once a
day, 21% twice a week, 26% three times a week, 18% said they don’t own a car,
and 32% said they don’t park along the road.
The results of this question indicate that participants don’t regularly park along
the road. 
2.14 Participants Travel Mode Influences
Participants were asked to provide an insight into the factors influencing their
travel mode decisions.  Participants provided a variety of reasons they viewed to
be barriers to travel by sustainable travel modes along the project route. To
enable the processing and presentation of data, the responses were categorised
into a number of themes.  A summary of the themes is presented as follows:  
• Road is too wide
• Animal droppings
• Poorly parked cars
• Speeding traffic
• Poor pavements
• Other
• Don’t have any
Considering the responses received, the majority of travel barriers relate to the
perception of traffic speed, poorly parked cars and the conditions of the
pavements. 
Many of these issues are within the scope of this project design and could be
directly addressed through design development. 
Page 124

Page 125

22 | P a g e
www.connectedtp.com 
2.15 Future Opportunities to Improve Active Travel
2.16 Participants View of Concept
Participants were asked to consider if they believed that the provision of a car
free route within the project area would encourage them to walk or cycle more
often. 9% of respondents believed that the provision of a route as described
through the public engagement process would encourage them to walk and cycle
more often and 91% said it would not. 
Page 125

Page 126

23 | P a g e
www.connectedtp.com 
2.17 Participants Travel Corridor Preference
To assist the design team in developing the most appropriate route corridor, the
community was asked which of the route options is best suited between the
pavilion and the ferry junction.  51% chose option 1, 3% chose option 2, none
chose option 3.
3% chose option 4, and 5% chose option 5.  The other 38% said that no
improvement is required. 
2.18 Community Route Preference
The community was asked which of the route options works the best between the
section of the route between the ferry junction and Albert Pier.  
• 53% of respondents indicated that Option A worked best (Widen route
and provide path on inland side keeping road as it is), 
• 8% of respondents said Option B worked best (Widen route and provide
path on coastal side keeping road as it is). 
• None of the respondent chose option C (Shared use of West Princess
Street then widen route and provide a path on inland side of road).  
• 39% said that none of the options should be considered. 
Page 126

Page 127

24 | P a g e
www.connectedtp.com 
2.19 Participants Views Regarding Front Green
The community was then asked whether or not the front green should be
improved.  To which 35% of respondents indicated that an improvement would
be welcomed, 58% of respondents said they didn’t want it to be altered, and 8%
said they didn’t know. 
Page 127

Page 128

25 | P a g e
www.connectedtp.com 
2.20 Participants Thoughts and Aspirations for Improvements
Participants were asked about their thoughts, aspirations and considerations the
proposed design should take cognisance of. To enable the processing and
presentation of the responses, the responses were again categorised into a
number of themes.  A summary of the themes is presented as follows and shown
in the chart opposite.
• Reduction in parked vehicles
• Don’t do anything
• Everything
• Improved lighting
• Cycle lanes removed
• More crossing points
• Return fairy lights
The feedback from the community to this question provides a good level of
insight into the challenges the design is required to address and highlights the
challenges in maintaining a design balance that will address all the points
proportionately.   
Page 128

Page 129

26 | P a g e
www.connectedtp.com 
2.21 Participants View on Future Project Locations
Participants were then asked whether there were any other locations on the Isle
of Bute the community think should be looked at for improvement. To enable the
processing and presentation of the responses, the responses were categorised
into areas.  
A summary of is presented as follows and shown in the following chart.
• The High Street
• Albert Pier
• No
• Kerrycroy
• Port Bannatyne
• Townhead 
Page 129

Page 130

27 | P a g e
www.connectedtp.com  STAGE 1 COMMUNITY FEEDBACK TOOL (CFT) RESULTS
Page 130

Page 131

28 | P a g e
www.connectedtp.com 
3 STAGE 1 COMMUNITY FEEDBACK TOOL (CFT)
RESULTS
Five initial responses were received through the Community Feedback Tool (CFT)
followed by a further 21 which were added by the design team to capture the
publics views following the public engagement.  The responses were provided
anonymously.
Participant's comments were located along the route.  In the majority, comments
were positive with participants providing concerns relating to visibility, a lack of
provision for pedestrians to cross with concerns that once the Pavilion opens,
more pedestrian traffic will be generated.  
Some of the comments provided detailed summaries of localised challenges which
will greatly assist the design development process.
The stage 1 feedback received is presented by location and verbatim in the
following figure and table.  Each comment reference is shown in the figure. 
Page 131

Page 132

29 | P a g e
www.connectedtp.com 
Stage 1 Community Feedback Tool comments by location
Page 132

Page 133

30 | P a g e
www.connectedtp.com 
1 Narrow section of esplanade at this location
2 When leaving Mackinlay street to turn right into town, it’s really
difficult to see past parked cars. This is very dangerous when driving,
but while on a bicycle I have several times had to go far into the road
in order to see both ways, once or twice being dangerously closely
passed by cars which I couldn’t see were coming while further back.
The curve of the road exacerbates this. Having lights there could
help, and when the Pavilion opens, I would expect more pedestrians
to want to cross from the prom to the Pavilion.
3 Intersection of ferry traffic lanes and road ignores the interests of
pedestrians. The junction here is also hazardous for cyclists. In fact
the whole section between the Pavilion and the pier is hazardous for
cyclists (parked vehicles, vehicles negotiating the mini roundabouts,
cobbled strips across the road, cars, lorries, buses all competing for
space). Maybe reduce the space devoted to parked cars (there are
underused parking spaces elsewhere in town, e.g. near the main co-
op store). Maybe idealistic but there is an excellent bus service on
Bute, it could be used more. Encourage people out of their cars,
pedestrianise Montague Street, apart from buses, have a dedicated
bike or bike/pedestrian lane right through from Prospect House to
Craigmore.
4 I think we need a safe crossing at the ferry crossing for pedestrians.
There is already a set of lights, it should have a ‘green man’ as well
as the lights for cars. If this is not a suitable spot, then perhaps the
raised areas opposite the Discovery theatre should be a safe
pedestrian crossing, I believe it was previously one.
5 No provision for pedestrian crossing at ferry junction location
5a Waste of Money!
6 I am opposed to the plan. Money can be spent much more wisely
and usefully. eg. designated lane for disabled users to get onto the
ferry lift
7 Not enough parking as it is, so don’t prefer any option that cuts down
parking, Option 1 takes least change to roads and uses a matured
foot path that exists
8 There is no designated parking for disabled passengers who need to
travel by car
9 Review pinch points - Ardbeg Po, Brechans, Gallowgate
10 Spend money on Albert Pier to Glenburn road
11 There is not enough parking in town as it is, so option 1 route should
not impinge on the road way
11a Option 1 preferred route
12 Option 1 preferred
Page 133

Page 134

31 | P a g e
www.connectedtp.com 
13 Include Palm trees in the middle of the road
14 Putting greens and gardens must be maintained for attracting tourists
15 Could this not be extended to the end of Battery Place?
16 Flower beds in centre of the road
17 pedestrian lights wanted at Victoria street/ high street junction
18 So many eye sores around ferry terminal that it would be a real
shame to lose the lovely areas around the winter gardens
19 Important to retain the coach parking at Albert Pier
20 Dangerous pavements here
21 Too many small Manhole covers on the pavement on Gallowgate
22 Pelican crossing in front of pavilion is preferable
23 Better curbs for wheelchair users  
Page 134

Page 135

32 | P a g e
www.connectedtp.com  STAGE 1 STAKEHOLDER FEEDBACK
Page 135

Page 136

33 | P a g e
www.connectedtp.com 
4 STAGE 1 STAKEHOLDER FEEDBACK
To support the design optioneering process, a number of stakeholders identified
within the stakeholder mapping were engaged with. A range of engagement
methods were used for each group.
Stakeholder Meetings
The study team met with a range of stakeholders identified through the study
mapping process.  We utilised consultation mandates to plan 1-2-small group
workshop sessions with key stakeholders to introduce the team and discuss the
study.  Stakeholders included:
• Key council staff;
• Key local groups;
• Local Community Councils;
• Other key stakeholders. 
The workshops followed a similar format providing an introduction to the study,
setting ambitions, and introducing the team.  
ABC Network Management
The team met with James Ross of ABC Network Management virtually to discuss
the Rothesay project. Following a presentation of the project to date, a
constructive conversation explored a number of topics including:
• Route alignment challenges, particularly relating to the sea defence
impacts, minimising future maintenance obligations and Roads
Construction Consent (RCC).  
Page 136

Page 137

34 | P a g e
www.connectedtp.com 
4.1 Council Statutory Consultees
The stakeholders identified through the stage 0 of this project and noted within
the stakeholder mapping were consulted as part of the project.  A summary of
the other stakeholder feedback received is summarised as follows.
4.2 Non-Council Statutory Consultees
A summary of the non-council stakeholder feedback received is summarised as
follows. 
4.3 Community Groups
Community groups have been engaged through the public engagement process. 
No direct response has been provided.
4.4 Traditionally Harder to Reach Groups / Individuals
Engagement was undertaken with the residents of the community.  The design
team arranged a meeting with Bute Prides chairperson Angie Webb.  As a keen
cyclist within the community, Angie was able to provide a great insight to the
challenges faced by those less heard voices. A number of issues were identified
including:
• The area is considered pretty safe already for walking and cycling when
compared with other urban locations;
• Noted that for older less mobile people, a lack of dropped kerbs and
coherent routes may limit travel options;
• Familiarity with the local area has added compliancy to accepting the
issues;
• Tractors in the area are massive and can be intimidating when cycling
along Victoria Street;
• The Front Green is noted to be ‘going downhill’ and would benefit from
improvements.
The Royal National Institute for the Blind (RNIB) was consulted and highlighted
that there is no specific representation for Rothesay available to provide
comment.
4.5 Landowners and Affected Parties
The design team worked with the local community / stakeholder feedback to
identify potentially impacted landowners.  The Registry of Scotland (ROS) was
contacted to obtain current legal land ownership details.  These details were
ABC Marine Operations Not consulted as no service impact
ABC Fleet Public Transport Not consulted as no service impact
ABC Outdoor Access Not consulted as no service impact 
ABC Youth Services Not consulted as no service impact
ABC Community Development
Team
Not consulted as no service impact
ABC Economic Development Not consulted as no service impact
SEPA Not consulted at this stage
Scottish Water No Issue. Details to be provided
SSE No Issue. Details to be provided
Page 137

Page 138

35 | P a g e
www.connectedtp.com 
included within our landowner engagement tracker and recorded within our
stakeholder mapping and constraint mapping (shown in circles).
The ROS confirmed that the study area is within the ownership of Argyll and Bute
Council (ABC).  
Page 138

Page 139

36 | P a g e
www.connectedtp.com  STAGE 1 BARRIERS AND OPPORTUNTIES
Page 139

Page 140

37 | P a g e
www.connectedtp.com 
5 STAGE 1 BARRIERS AND OPPORTUNITIES 
5.1 The Challenges to Active Travel
The community engagement programme has identified a number of barriers to
travelling sustainably.  These have been categorised and summarised as follows:
• lack of lowered curbs;
• Dangerous pavements;
• Access to the ferry terminal limited;
• Protecting the front green is a concern;
• Lack of provision for disabled and minority user groups;
• Lack of pedestrian crossings;
• Vehicle speeds a concern;
• Dangerous road crossings at points;
• Improvements to pedestrian and cycle crossing on Victoria Street, at the 
ferry terminal junction and the pavilion; 
• A clear preference for no impact on parking;
• Minimise the impact on Albert pier due to tourist traffic and coach parking;
• Why here and why such a short section of route;
• Limited support for investment or change;   
Page 140

Page 141

38 | P a g e
www.connectedtp.com 
STAGE 2 – COMMUNITY ENGAGEMENT
Page 141

Page 142

39 | P a g e
www.connectedtp.com 
6 STAGE 2 – COMMUNITY ENGAGEMENT 
6.1 Further Engagement
Following the conclusion of the stage 1 consultation and completion of the stage
1 options feasibility report, option 2 (road corridor with route on coastal side) was
shortlisted for further development and consultation. The decision to progress the
design was partly due to the limited responses received during stage 1 and the
anticipation that by providing an example of what could be achieved, a greater
proportion of the public would engage during stage 2.
The scheme was also extended from Albert Pier to Glenburn Road to address
some of the stage 1 feedback regarding the useability of the route and concerns
raised regarding developing short sections of route.
To support the process, the engagement plan as described within the stage 1
section of this report was repeated.  This included:
• A second public event was held on the 21st August 2024 at the Discovery
Centre between the times of 16:30 and 20:30; 
• A interactive discussion session with S4 pupils of Rothesay Academy to
review the concept ‘fly though’ animation, capture views and test the
engagement materials.
• A drop-in session at Rothesay Swimming Pool using the ‘Toblerone’
interactive podium. The event lasted 1 hour and captured the views of the
community within the swimming pool foyer; 
• Production of a 40-minute-long Project Podcast to explain the Frequently
Asked Questions (FAQ). The podcast was hosted on-line within the project
virtual room; 
• A post public event Bute Community Council public meeting was hosted by
the council on the 26th September.  Two one -hour long meetings were
facilitated to present the scheme and allow further question and answers of
the community’s concerns. The event was advertised by Bute Community
Council utilising social media and leaflet distribution.  The design team also
advertised the event on social media; and
• Production of a 4-minute-long video infomercial to provide an explanation to
the project and limitations to funding. The use of an video format had been
developed successfully on other projects and supported more meaningful
engagement with the community.
Similar to the stage 1 event, 5 large formats graphically designed A1 presentation
boards were developed to explain the project along with 3 x 1.5m x 2.0m long
concept design prints.  
It was noted that during the stage 1 event, the public experienced some difficulty
in working with the map-based images. To improve on the publics interface with
the study materials a ‘fly along’ video was produced for stage 2 using a
combination of Google Earth and the scheme concept design. The ‘fly through’
was projected onto the Discovery Centre wall using a large format projector and
supported by narration provided by the study team.
Page 142

Page 143

40 | P a g e
www.connectedtp.com 
The event was advertised to the community through the use of local press
coverage in Appendix C (Isle of Bute News), local poster advertising and support
offered from the Bute Community Council.  The team again posted regular
updates using social media in advance of the event. 
These updates being reposted by the community multiple times across the
community’s own social media space including the Isle of Bute Facebook Page.
All visitors attending the event were given the choice of completing the project
survey questionnaire or accessing our range of digital tools to provide feedback
via QR codes and URL links.  A key advantage of the digital platform is, that even
with the poor impact of weather on attendance, the materials could still be
accessed and commented upon at a time that best suited the consultees. 
The event took place on a wet and rainy weekday night. A total of 110 people
managed to meet the team (90% increase from the 61 attendees for stage 1). 
During the event, the majority of visitors were observed by the design team to
bypass the project information boards provided and congregated around the ‘fly
through’ video.  A number of visitors attended promptly and prior to the
completion of video / event set-up. Many of the visitors were noted to repeat the
same questions regarding project funding, parking impacts and how the
pavement parking ban would impact on their businesses.  This information being
available within the bypassed boards.
The team struggled to manage the surge of visitors and the number and
frequency of repetitive questions, with many being raised by new visitors joined
the rear of the group. 
Due to the loud voices of a few, a number of visitors who were supportive of the
project felt uncomfortable speaking up in public resulting in many of the louder
and more aggressive voices dominating the event.  A number of those in support
of the project investment did reach out and engaged with the design team later
during the event.
It is noted, the value offered by the online engagement platform also allowing the
islands community to still provide their feedback for a period of six weeks post
event. A register extract of those attending the event is shown in Appendix B.
Post event, leaflets and surveys were left on the counter of Rothesay’s Discovery
front desk and the large format concept plans left on display for a period of four
weeks, before being reused at the Bute Community Council public meeting.
The design team met and spoke with a number of people in the community,
visiting the Rothesay joint campus and the Discovery Centre.
All school pupils engaged in project conversation and either completed a survey
response on their own or provided feedback that the team used to complete a
survey on their behalf at that time. 
Page 143

Page 144

41 | P a g e
www.connectedtp.com 
6.2 Event Advertising
The advertising approach to stage 2 was similar to stage 1 with the key
difference of scaling back the leaflet production following further advise and
support from the Bute Community Council.  It was agreed that the use of paper-
based leaflets would have limited value within Rothesay as the island is more
reliant on digital media (Facebook) and word of mouth.  Accordingly, only 100
leaflets were printed for stage 2 and advertised through the town three weeks in
advance of the planned public event. Leaflets were this time distributed by a
representative of BUTE BID whilst the design team issued leaflets to the Library,
town businesses, Discovery Centre and Co-Op.
The study Facebook page alongside the community page were used to advertise
the event with a number of post prompts issued in advance.
A paid for advertisement was also take out within the Argyllshire Advertiser who
subsequently printed a number of editorial extracts (weekly).
During the design teams visit to the island the digital ‘Toblerone’ advertising
totem was also deployed to raise community awareness of the forthcoming event
and project.
Rothesay joint Academy also agreed to circulate information to parents and pupils
through the PTA and student council.
The public engagement event was open to the public for comment for a total
period of six weeks (two weeks in stage 1) to maximise the opportunity for public
feedback. The consultation period was supported again through the use of virtual
engagement room which had subsequently also been revised and improved. 
Page 144

Page 145

42 | P a g e
www.connectedtp.com 
Photos from August 24th Public and Schools Engagement
Page 145

Page 146

43 | P a g e
www.connectedtp.com 
Stage 2 Concept 3D Flythrough Extract
Page 146

Page 147

44 | P a g e
www.connectedtp.com 
7 STAGE 2 - SURVEY QUESTIONNAIRE RESULTS
7.1 Sources of Community Feedback
The multiple engagement platforms made available to the community
supported the community to engage with the project providing feedback
both digitally and physically.  
A summary of the received feedback by the various engagement platforms
used is summarised in the following table.
Format Responses Received
Survey (Paper) 22
Survey (Digital) 603
Community Feedback Tool (Digital) 85
Total Quantitative Responses 710
Community Public Event Attendees for stage 2 110
Stakeholder Meetings 4
Bute Community Council Public Meeting Attendance 19
Total Non-Quantitative Responses 133 
4 Census 2022
7.2 Survey Sample Validation
A total of 710 quantitative responses were received from the island’s population
of 6,498 residents (c.3,328 households)4.  This represents a sample size of
around 11% which is aligned with the 10 – 15% typically received on other
similar projects. This equates to sample size of 16% when considering the
population of Rothesay.
The results are also higher sample rate than those received for stage 1 (45
responses - 1% sample).  
The higher stage 2 level of response is a positive reflection on the additional
methods invested to engage with the community, the value of utilising an
extended six-week consultation period and possibly the extension of the route to
include Battery Place to Glenburn Road.  
These results are despite the event being undertaken during a wet and windy
summers night which will have had an adverse impact on the community’s
appetite to visit the event.
An analysis of the survey responses received is provided in the remainder of this
chapter. The free text comments provided as part of the survey responses are
included in Appendix D.  
Page 147

Page 148

45 | P a g e
www.connectedtp.com 
Stage 2 – Section A - Participant Demographics
7.3 Participants Age
This question was asked as it is important to capture the views of people with
varying levels of life experience and perspectives. 
Of the participant responses received:
• 16% were aged under 40 (16% census 2022).
• 40% were aged between 40-59 (26% census 2022).  
• 33% were younger than 60-79 (34% census 2022).  
• 2% were older than 79 (8% census 2022).  
These results highlight that not only have more people participated in the project
but a wide range of age groups across the community have been consulted. The
results indicate a slight over representation of 40–59-year-olds (40% project vs.
26% census).  However, all other age bands are well aligned with the census
2022 for the Rothesay ward area. 
The under 40 years olds are now also better represented when compared with
the stage 1 results (16% stage 2 vs. 8% stage 1). 
Page 148

Page 149

46 | P a g e
www.connectedtp.com 
7.4 Participants Gender
Of the total respondents, 52% were women / girls (52% census 2022) and 37%
as men / boys (48% census 2022).  1% of respondents identified as non-binary,
0.50% were transman and 0.17% transwomen. 9% of the respondents indicated
that they would prefer not to say.
Overall, the results reflect a reasonable cross-section of the community and are
broadly aligned with the census demographic split, albeit slightly less respondents
identifying as men / boys.  A key difference from the stage 1 results is that the
views of females are better represented aligning well with the census data (52%
project vs. 52% from 2022 census). 
7.5 Participants Health
The majority of participants considered themselves to be able-bodied and did not
have a health or disability that impacted on their everyday mobility (72%). No
person indicated they have some health or disability which limits their day-to-day
activity a lot, however 13% of respondents did indicate that their disability or
health issue would affect them a little. 16% participants preferred to not say
anything. 
Page 149

Page 150

47 | P a g e
www.connectedtp.com 
7.6 Details of Participant Health
Of the respondents indicating they did have a health-related disability, 20%
indicated their disability was related to mobility or stamina but not breathing
related.  
These questions are important to ask as they assist the design team in designing
for all user groups, including those with protected characteristics. 
7.7 Participants Employment Status
Participants were asked to qualify their employment status. This question was
relevant to ask as the design team will need to consider how the project would
support economic activity and support the movement of people to and from
places of work as part of ‘everyday’ journeys.
1% of the respondents indicated that they are currently not employed.  50%
indicated they were employed either part time or full time, 30% indicated they
were self-employed and 18% of respondents said they were retired or not
applicable. 
Page 150

Page 151

48 | P a g e
www.connectedtp.com 
7.8 Results Comparison with 2022 Census
To assist in understanding more about how representative the survey
demographics are, the survey results were compared with the 2022 census5 for
Rothesay.  The results indicate that the project feedback demographic by age and
all genders is broadly comparable with the census analysis noting that the under
21 years olds is a small proportion of the community at only 3%.
Overall, the study results are considered to capture a good sample of the
community, capturing the views of both able bodied and those less able, those in
work and those unemployed or studying.
The results also show an improvement on the stage 1 results with the
demographics presenting a more representative match with the census. This is
partly due to the increased sample size. 
5https://www.citypopulation.de/en/uk/scotland/argyll_and_bute/S52000547__rot
hesay/
7.9 Participants Residential Status
Respondents were asked if they lived in Rothesay.  This question was relevant to
ask as it is important to understand if the respondent is responding with longer
term experience of the community or as a tourist/visitor.  
• 70% of respondents are full time residents in the community.
• 25% have either lived in the community historically, or visited at least once a
year.
The results indicate that ¾ of the respondents are commenting as longer-term
members of the community. 
Page 151

Page 152

49 | P a g e
www.connectedtp.com 
Stage 2 – Section B - Participant Travel Habits
7.10 Walking and Wheeling between the Pavilion to Glenburn Road
All participants (residents and visitors) were asked how often they currently walk
or wheel from the Pavilion to Glenburn Road. A summary of the results is
presented below.
• 45% of the participants said they travel this section less than once a week or
never.
• 39% say they travel this route more than once a week. 
• 17% indicated they travel the route more than once a day.
Overall, 45% of respondents do not walk or wheel the route regularly. With 39%
using the route at least once a week and 17% using the route more than once a
day.
Overall, the route between the Pavilion and Glenburn Road is not well used
currently by walking or wheeling modes as part of respondent’s everyday travel. 
It may be possible that part of the route is more popular but this would require
further investigation through survey to qualify.   
Page 152

Page 153

50 | P a g e
www.connectedtp.com 
7.11 Cycling between the Pavilion to Glenburn Road
All participants (residents and visitors) were asked how often they travel from
Pavilion to Glenburn Road using a bicycle.
• 85% say they never cycle this route. 
• 13% say they travel this route more than once a week. 
• 1% indicated they travel the route more than once a day.
Overall, more than 85% of respondents do not own a bike or cycle the route
currently. A further 13% travel the route less than once a week with only 1%
cycling regular every day.
The route is therefore not popular for regular cycling as part of everyday
journeys.  Similar to walking results from the previous question, it may be
possible that part of the route is more popular but this would require further
investigation through survey to qualify. 
Page 153

Page 154

51 | P a g e
www.connectedtp.com 
7.12 Parking Along the Route at Victoria Street or Albert Pier
All participants (visitors and residents) were asked how often do they park on
Victoria Street or Albert Pier.  
• 25% of the participants said they rarely park 
• 12% say they don’t own a car.
• 9% said they park once a week, 
• 9% also say they park less than once a week, 
• 8% park two days a week, 
• 8% park 3 days a week, 
• 6% of the participants say they park on this route once or more a day, 
• 5% park on the route 4 times, 
• 5% times a week, 4% park 6 days a week and 
• only 2% park along the route at the weekends only.
Overall, a relatively small proportion of the total survey respondents parked a
vehicle within the study area on a regular basis.  This is relevant when
considering in conjunction with the number of comments provided by
respondents in relation to overall parking deficiency within the study area. These
are qualified later within this chapter.  
Page 154

Page 155

52 | P a g e
www.connectedtp.com 
7.13 Views if the Concepts Offers Benefit to the Community
All participants (visitors and residents) were asked if they felt the proposed
concept design suited the community’s needs?  This question helps us understand
the community’s thoughts on the appropriateness of the design and their
understanding of the project aims and funding limitations.  
Residents
95% of resident’s respondents who own a car or drive said ‘No’ and 5% of
respondents said ‘Yes’.  2% answered ‘Don’t know’. These results indicate the
community is overall unsupportive of the concept design and the value it may
bring. This level of response may indicate issues with the concept, concerns
regarding change or a lack of understanding of project aims and funding. 
Visitors
Visitors to the island who also drive responded with 86% saying ‘No’ and 14% of
respondents said ‘Yes’. These results indicate that visitors to the community are
also unsupportive of the proposed scheme, but less so than the residents (5%
residents support concept vs. 14% of visitors). The slight difference in positive
opinion might reflect difference in opinion regarding the ‘fear of change’ with
visitors more open to changes 
Page 155

Page 156

53 | P a g e
www.connectedtp.com 
7.14 Views on Concept Community Benefits by Car / Non-Car Drivers
The resident community (only) results were interrogated further to better
understand how their views are aligned with their mobility habits. An analysis of
residents (only) views on the concept designs benefit to the community based on
their preference to own or use a car was examined.
Non-Car Users
A total of 17 respondents (55%) indicated that they did not regularly use a car.
This is lower percentage of non-car owners than the census 2022 (43%) and
reflects that not all respondents disclosed their use of car.  A total of 59% felt
that the concept design would not offer benefit to the community, with some
expressing concerns relating to the design’s safety. A total of 41% of resident
respondents felt that the concept would offer benefit to the community and
offered a welcomed addition. 
Car Users
A total 292 respondents indicated that they did regularly use a car or park within
the study area. Of these a total of 96% felt that the concept design would not
offer benefit to the community, with some expressing concerns relating to the
value of investing in other more necessary improvements including additional
parking. A total of 2% of resident car user respondents felt that the concept
would offer benefit to the community and offered a welcomed addition.
Overall, it appears that the non-car users are more supportive than car users
(non-car 41% support vs. car users 2%).  The overall number of non-car users is
however much lower than those regular car users reflecting a small sample. 
Additional surveying would be required to assist in qualifying any relationship
between response and car use. 
Page 156

Page 157

54 | P a g e
www.connectedtp.com 
7.15 Views on Concepts Community Benefits by Gender 
The resident community results were interrogated further to better understand
how their views relate to their stated gender. An analysis of residents views on
the concept designs benefit to the community based on their gender was
examined. To aid in reporting, the multiple gender groups have been combined
into two groups, female and male.
Female
A total 205 respondents indicated they were women, girl or trans female. Of
these a total of 95% felt that the concept design would not offer benefit to the
community. A total of 3% of resident respondents felt that the concept would
offer benefit to the community and offered a welcomed addition. 
Male
A total 165 respondents indicated that they were male, boy or trans man. Of
these a total of 86% felt that the concept design would not offer benefit to the
community. A total of 13% of male grouped respondents felt that the concept
would offer benefit to the community.
Overall, it appears that the women grouped respondents are slightly less
supportive than male grouped of the concept (female 3% support vs. male 13%).   
Page 157

Page 158

55 | P a g e
www.connectedtp.com 
7.16 Views on Concept Community Benefits by Employment Status 
The resident community (only) results were interrogated further to better
understand how their views relate to their employment status. An analysis of
residents (only) views on the concept designs benefit to the community based on
their employment was examined. 
Employed
A total 148 respondents indicated they were not currently employed, retired or in
education. Of these a total of 87% felt that the concept design would not offer
benefit to the community. A total of 11% of resident respondents felt that the
concept would offer benefit to the community and offered a welcomed addition.
2% remain unsure and did not comment. 
Unemployed
A total 232 respondents indicated that they were in employment. Of these a total
of 94% felt that the concept design would not offer benefit to the community. A
total of 6% of respondents felt that the concept would offer benefit to the
community. A total of 1% indicated they were unsure.
Overall, it appears that the employed grouped of respondents are slightly less
supportive than male grouped (not-employed 11% support vs. employed 6%).   
Page 158

Page 159

56 | P a g e
www.connectedtp.com 
7.17 Views on Concept Community Benefits by Age 
The resident community results were interrogated further to better understand
how their views relate to their stated age. An analysis of residents’ views on the
concept designs benefit to the community based on their age was examined. To
aid in reporting, age bands have been grouped into 21 and under and 21 and
over.
Respondents under 21
A total of only 8 respondents indicated they were 21 or under. Of these a total of
25% felt that the concept design would not offer benefit to the community. A
total of 75% of resident respondents felt that the concept would offer benefit to
the community and offered a welcomed addition. 
Respondents over 21
A total 240 respondents indicated that they were aged over 21. Of these a total
of 93% felt that the concept design would not offer benefit to the community. A
total of 5% of respondents felt that the concept would offer benefit to the
community. A total of 2 % indicated they were unsure.
Overall, it appears that respondents under 21 years are old are more supportive
of the concept.  However, with only 8 respondents, the sample size is noted to be
small and potentially under representative. Those older than 21 are more likely to
be employed and are less supportive of the proposed change. 
Page 159

Page 160

57 | P a g e
www.connectedtp.com 
7.18 Views on Design Measures Supporting Future Walking and
Wheeling
The community (both residents and visitors) were asked, whether the concept
measures are likely to improve opportunities for future walking and wheeling
within Rothesay.  The majority 90% think the design will not result in any
increased walking or wheeling activity.  The remaining 10% support the design
and believe it will encourage more walking and cycling for the community. 
7.19 Views on Appropriateness of Concept with Current Community
Needs
To help us understand how participants currently feel about the concept’s
alignment with current community needs. Respondents were asked if they were
overall pleased with the concept would address current mobility concerns.  These
concerns were raised by the community through the 2016 design charette.  90%
of respondents said they were concerned and thought the concept was
unsatisfactory.  The remaining 10% indicated that they were pleased with the
concept and that it would support the community’s current mobility needs. 
Page 160

Page 161

58 | P a g e
www.connectedtp.com 
7.20 Respondents Views Regarding Perception of Project Value and
Intended Use
The results of the survey feedback were further interrogated to better understand
how the community have responded to the concept.  Each survey response was
interrogated to further understand how well informed the respondents are whilst
providing feedback.  The comments were varied in detail with some statements
including excessive detail, negative slurs, personal attacks on individuals and the
use of expletive language.  These types of response are not typically associated
with a civilised community.
In some cases, and by contrast a proportion of responses included a copy and
paste of a short statement with a clear indication of completing and submitting
the survey as quickly as possible.
From a review of the surveys a number of observations were made.
• A total of 1,686 individual comments were provided6 across the 603 surveys
received.  
• In the majority, most respondents when providing a comment noted they
would prefer the project to be ‘scrapped’ or consider it to be a ‘waste of
money’ (22% of all comments and 62% of all surveys received).  
• 18% of the comments suggested changes that are beyond the scope or
reach of the project. These comments would therefore indicate the
respondents lack of understanding of the projects aim and limitation in how 
6 Users were limited to single use IP addresses.
the funding can be used.  A number of comments referenced other general
feedback which could also indicate the respondent is making comment
through influence of others.  It was noted through social media that a
number of people within the community were influencing feedback either
through provision of mis-information or seeking to increase their personal
status as community contributors.
These comments have been recorded by the design team as ‘project
misunderstood’ and accounted for just over half of the feedback received. C. 51%
of the total survey responses received.
• A total of 16% of the comments made indicated that the project was not
needed or unwanted.  These direct rejection comments accounted for just
under half of the surveys received (45%).
• A total of 13% of comments indicated that respondents felt the project
would not be used once complete. These comments accounted for 35% of
all survey responses received.
7.21 Respondents Views on the Suitability of the Design
Only 10% of all comments received related to views expressed (positive or
negative) referenced the suitability of the concept design. These comments
accounting for 27% of all survey responses received. 
Details of concept design suggested changes are summarised as follows. 
Page 161

Page 162

59 | P a g e
www.connectedtp.com 
• A total of 6% of comments indicated that the design was ‘too focused on
cycles’ and /or would introduce potential safety concerns. These comments
being mentioned in 16% of all surveys received.
• A total of 4% of all comments received suggests that the project would be
best relocated elsewhere.  Alternative locations were however rarely
suggested.  These comments accounted for 11% of all surveys received.
A summary of the comments received by percentage popularity and a summary
of comments received as a percentage of total survey responses received is
presented in the following charts.  
Page 162

Page 163

60 | P a g e
www.connectedtp.com 
Page 163

Page 164

61 | P a g e
www.connectedtp.com 
Page 164

Page 165

62 | P a g e
www.connectedtp.com 
7.22 Summary of when Responses were Received
Analysis of the timeline of when the surveys have been received was also
undertaken.  This analysis is relevant as it can assist in understanding how the
community have reacted to both the range of engagement methods used but also 
the strength of feeling of the respondents.
It was clear from the stage 2 public event that a portion of the community did
have concerns regarding the concept design and were very vocal to make their
opinions known.
Analysis of the survey entries shows that the majority of responses received were
submitted within the first 48 hours. On the 21st of August 279 (34%) surveys had
been completed on day one. 
A further ‘thank you’ Facebook post was issued by the design team to the
communities group page ‘The Isle of Bute’ and ‘Rothesay, Pavilion To Albert Pier
study page’ following the event.  This increased the survey results by 387 (47%)
to 81% within the first two days.
It is observed following multiple social media public ‘call to action’ posts issued
within the six week consultation period, only a small increase in surveys were
received.  
Ongoing social media debate indicated a lack of support for the scheme which did
not translate into additional survey responses.  It is therefore concluded that the
majority of the population ‘active’ on social media submitted a survey at the study
outset within the first 24 hours with the limiting ‘one survey per IP address’
preventing repeat survey submissions.
The results in combination with the low level of stage 1 feedback, indicates that
the majority of surveys have been completed by a ‘group’ of the community
active on social media and generally unsupportive of the project.
The timeline analysis of response is shown in the following chart. 
Page 165

Page 166

63 | P a g e
www.connectedtp.com  STAGE 2 - COMMUNITY FEEDBACK TOOL (CFT) RESULTS
Page 166

Page 167

64 | P a g e
www.connectedtp.com 
8 STAGE 2 - COMMUNITY FEEDBACK TOOL
(CFT) RESULTS
8.1 Summary
A total of 85 additional responses (stage 2) were received through the
Community Feedback Tool (CFT) for the stage 2 consultation (110 total).  The
responses were provided anonymously.
Participant's comments were located along the route.  Comments covered a wide
range of subjects including providing challenge on the detail of the concept
operation with a focus on septic tank conflicts, parking and access to the church
and approach to the project.
The stage 2 CFT feedback received is presented by location and verbatim in the
following figure and table. Each stage 2 comment reference is shown in the
figure.  
Stage 1 comment reference are not shown in the following figure to avoid
confusion.  
Page 167

Page 168

65 | P a g e
www.connectedtp.com 
Stage 2 -Community Feedback Tool comments by location (all comments)
Page 168

Page 169

66 | P a g e
www.connectedtp.com 
24
The council already have a problem funding existing flowerbed. Introducing more flowerbeds
beds will not be well maintained in the future. Getting the existing pedestrian infrastructure
into good order should be a priority. The pavements and footpaths are dangerous especially
in Montague Street. I wouldn't like to have poor eyesight when trying to navigate my way
around bad paving slabs.
25 First this area is used by the fair every year, where is it to go. Second it is ideal for walkers
with without dogs, cyclists and pedestrians do not mix.
26 As people get older, they tend to rely on wheelchairs or even mobility scooters to get
around. Narrowing the pavement in this plan will make it more difficult for them and other
pedestrians. I would be extremely surprised if such a proposal to narrow a pavement (which
the pavement parking ban is trying to address) could pass any competent equality impact
assessment. Narrow pavements are also a problem for people with prams.
27 Do not impose floating pavements - where pedestrians/ bus passengers have to negotiate
the cycle path in order to get on/ off a bus. RNIB are running a campaign highlighting the
dangers of these crossings for bus users - especially those who are elderly or have visual
impairments.
28 There is definitely conflicting views about the track. Your plans on this site show the paths
which are already round the promenade area and not the plans which have been produced
for the front page of the local paper. Local people realise that this money is confined only to
the Cycle Path but what about the condition of the pavements. Are you going to repair the
parts where the track has to go and leave the rest in a bad condition?
29 Along this stretch of pavement local residents and holiday makers actually walk but you are
making this pavement smaller - are parents/grandparents out walking with prams meant to
walk in single file and not communicate to anyone along the cycle route? What about people
with disabilities - are they meant to walk/manage wheelchairs for example next to cycles
whizzing past? What about residents with hearing difficulties and accidentally wander into
the track. Will you make bikes have loud bells on them? Please do not return the advice that
people could walk on the prom part as if weather is inclement this is not viable: this part of
the prom was blocked off to vehicles etc due to part of it being unsafe. This whole cycle
route will be a disaster for residents and despite what you say you are not listening to
residents.
30 You have omitted to change this since the last consultation where you were advised that the
ferry terminal can be very busy and cars are parked to as near the road as possible, leaving
enough room for pedestrians to cross. It was a pity that you were not here during the
Highland Games to see the volume of traffic. If you put the cycle lane at this part where are
pedestrians meant to cross or are you trying to make Bute residents cross where you, who
do not live on the island or actually listen to the residents, decide we have to cross.
31 Council can make extra parking places here but there is a crossing which dictates how near
cars can be to the crossing, unless you wish everyone to break the law.
32 Increased parking for coaches means you are reducing parking, which is at a premium, to
cars. Where are residents meant to park? The other side of the road you intend to put in
more parking places which is something the council could do as they will collect the money
from car parking places. You are only talking about two extra spaces at the most at this
location. 
33 Where are pedestrians given the right of the pavement which they are entitled to? Are
parents meant to keep youngsters on a short leash so they do not stray on to the proposed
cycle path? 
34 An overflow carpark for the pier should be considered but never at the expense of the winter
gardens. This area has HUGE cultural significance to the island and it must never be used
for anything other than recreational use. 
35 With the increase in volume of motors on the island this year, when the pier is full cars are
seen overflowing along Victoria street. The weekend of butefest saw motors cue to the
pavilion. the narrowing of the road for a clue path will create more issues for island residents
36 Due care and attention is required around the town cenotaph. A cycle lane along front of this
monument is a sheer mark of disrespect. 
Page 169

Page 170

67 | P a g e
www.connectedtp.com 
37 More Cobble stones should be installed as a traffic calming measure.
38 Removing parked cars from this pavement will certainly be more sightly. However, with
homes and guest houses along battery place, homeowners will have nowhere to park. 
39 Narrowing of road is not advised, even if cycle lanes were installed, road cyclists will not use
them and will make road conditions more dangerous when overtaking. With the narrowing of
the road along Victoria street, visibility will be worse for larger vehicles(tractors, HGV, bin
lorrys, Emergency services) spotting pedestrians 
40 Parking heavy buses on the seawall is not advised 
41 Any new area of pavement created will require bollards to prevent pavement parking. 
42 Create more car-parking (not less) for tourists bringing their tourist money to Bute. Formally
permit pavement parking (permitted and tolerated for years) on the ocean-side pavement of
E Princes St and Battery Place. Guest houses and hotels in Battery Place already suffer with
inadequate street parking. This proposed cycle-lane plan makes it worse. Eventually, all
Rothesay businesses will suffer when guest houses can't attract Bute visitors for lack of
parking.
43 Pedestrianise Montague Street, reduce through traffic to residents/shopkeepers and
deliveries with moveable bollard.
44 Victoria Steet should foster designs utilised in Montague street that work to subtly reduce
speed of traffic. Road is level with pavement, reduces car priority, pavement is maintained
across side streets to denote pedestrian priority. Ambiguity in road design can work well to
encourage drivers to be more courteous and considerate.
45 The 3 coach parking bays on the harbourside would block the view to the harbour for local
cafes. Additionally more difficult for coaches to manoeuvre in and out.
46 I think that Rothesay already IS a 20 minute neighbourhood, but even if it's not - I have a
query about why the Promenade (broad, runs from Pavilion to Ferry Terminal) is not being
utilised for this? Similarly, on the other side, there is the pavement at high level and a lower
level path - can't one of them be utilised as cycle path. Narrowing the road (which is already
pretty narrow) feels like the wrong option.
47 Speed bumps need to be installed or speed cameras . Daily witness vehicles r speeding
along here .
48 Persistent inconsiderate parking long term by large motor homes block the pavement at
Albert Pier just past the phone box. Albert pier also currently used as a dumping ground for
unused trailers and the odd caravan when not being used. What is happening to the derelict
building?
49 Taxi rank must be sustained to allow for 11 taxis (current level)
50 Make the lights pedestrian and traffic flow controlled. The crossroads are busy and getting
across can be challenging
51 Toilets at Albert pier need demolished and for it to have proper spaces for coaches as they
currently have to park up on the pavement
52 Need to ensure enough spaces for taxi rank
53 Must allow for parking / pulling in to drop off passengers for when Pavilion reopens
54 Albert Pier area is a weed strewn mess. Any chance of sorting this building and getting the
fences down?
55 Trying to cross the road at this roundabout is difficult.
56 Will Camper Vans and motor homes be moved off the pavement at East Princes Street
57 Ferry Traffic makes this side of the road difficult to cross.
58 The cobbled area at the pier side of Guildford Square is too difficult to negotiate in a
wheelchair comfortably or safely. The zebra crossing kerbs need to be dropped more.
Crossing most of the roads on the way along from the start of the town at battery place to
the pavilion can be very difficult in a wheelchair and potentially unsafe as the chair can get
stuck, the dropped kerbs are not dropped enough in some areas and as a result can be
painful. There is also difficulty in accessing dropped kerbs due to drivers parking
Page 170

Page 171

68 | P a g e
www.connectedtp.com 
inconsiderately beside them. Please allow some dropped kerbs along the way on the
opposite side of the road to the intended route for wheelchair users to be able to cross safely
from.
59 If you want to promote cycling why not look at providing a safe cycle path from the Port to
Ettrick? A very popular route and you could use the existing overgrown walkway 
60 This is a waste of money as we have a wide promenade where you can cycle already or
road is perfectly safe to cycle. 
61 Cyclists that come onto the island will not use a cycle path as they will be happier on the
road and will be travelling much further than the cycle lane and will be travelling faster than
safety would allow. I’m not really sure who this path is designed to be used by? It doesn’t go
anywhere and anyone accessing it will have had to ride on the road to get there…. Riding
through Rothesay is not dangerous but mixing cycling and pedestrians is. 
62 This entire stretch of Battery Place includes a large number of guest houses / B&Bs, and
multi-story apartment buildings. Consequently there is insufficient parking on the inland side
of the road, as a result of which many cars park on the wide pavement on the shore side of
the road - not out of disregard for the law, but out of necessity. The proposed plan offers no
relief to this situation, but in fact makes it worse, but turning the roadside half of the
shoreside pavement into a cycle path, which would therefore make it doubly an offence for
cars to park there. Thus the plan (debateably) enhances the experience of a tiny minority of
cycle users, at the expense of a very substantial number of resident vehicle users. 
63 How’s about making the taxi rank better looking and en outing for electric taxis
64 Argyll & Bute Council's prime consideration should be first and foremost for the residents
before accepting external funds for a vanity project that benefits few but adversely impacts
on the lives of residents in E Princes Street and Battery Place. For many years parking has
been allowed on the ocean-side pavement where this proposed new few hundred yards of
cycle track is to be. Despite the law prohibiting pavement parking that A&B Council will be
enforcing by the end of 2024, it is quite within the power of the Council to legitimise parking
on the ocean-side pavement so that residents can continue to live harmoniously instead of
squabbling over few remaining parking spots. With government encouragement, over the
years houses have been sub-divided into multiple occupancy. Where there was once a
three-storey home with perhaps a maximum of two vehicles, there are now properties along
Battery Place that have been sectioned off into 3, requiring parking for up to six vehicles. E-
Princes St to the end of Battery Place requires and deserves parking both sides of the road.
A&B Council have the power to do this instead of considering a non-sensical cycle track
along this route and a ridiculous waste of tax-payer money to simply redesign the coach
parking and car parkings and rip up characterful cobbled paving to replace with unsightly
tarmac. Why is this plan also reducing the number of taxi stands from eleven to four? Are
the taxis to double-park elsewhere? There are simply too many bad elements to this
proposal.
65 I have a separate question which we need to start a community chat about. The question: Is
Argyle and Bute Council the most incompetent Council in Scotland? From all the holiday
resorts in Scotland I have been to the areas the council are responsible for looking after are
easily in the worst state of repair. Any repair they do undertake is half finished and
barricaded with Herras fence. Rothesay is becoming like a building site where all the Herras
fencing will eventually join to encircle us! A resolution to an actual problem would be useful.
Middle of the busy season or any other season for that matter is there any difficulty walking
or cycling from the Glenburn to Rothesay? None I have ever seen. So what exactly is the
problem being resolved here? The resolution of a non problem is clearly causing many
actual problems for real residents and holidaymakers. Many roads have one pavement.
Battery place has 3 and one of them is wide enough to fit a bus and still have space to walk
and cycle on but somehow Battery place needs more space for walking and cycling. Have
the designers been to Battery Place? There are very few side streets so no real alternative
for parking. This proposal needs to introduce full parking both sides of the road all the way
along east Princess Street and Battery Place and beyond. This affects so many businesses,
residents and holiday makers. Hotels, B&B’s, cafes, working people. Some of the residents
may be retained fire fighters for all these designers know. They need access to their
vehicles!
66 The scheme appears to have limited thinking it neither adds to Rothesay being a
contemporary destination with ease of access, nor does it add to the connectivity of the
Page 171

Page 172

69 | P a g e
www.connectedtp.com 
town. The current scheme ignores the awesome opportunity of integrating the promenade
with a cycle path. the island has more mobility scooters and access to the promenade is a
bit tortious in places, so any improvement would be a benefit. Overall the proposed scheme
does not connect anything for people in town, what would be of benefit would be a cycle
pathway from the ferry to the school, connecting the doctors, the hospital and the health
center 
67 Battery Place towards to Glenburn Hotel do not need a cycle lane to cost more space
problem which is already has. As there is most B&B located here, business need the car
park space. Passed weekend just between 3 B&Bs there are 40 car space needed on both
side road plus car space for residents alone the road. This plan will not benefit anyone on
Rothesay. The pedestrian pass along the seafront is enough and safe for people walk pass
Battery Place. 
68 Road is far too narrow for large vehicles passing or when cyclists who will use the road 2
abreast it will be impossible to pass them leaving 1.5m
69 I think extending the pavement in front of vehicle access to the pier and ferry will cause
chaos.
70 Waste of money in my opinion. Will cause more problems than benefits. Bute is already a
safe cycling zone and the distance you have proposed is ludicrous.
71 This whole scheme is not suitable for this area. It will cause congestion and difficulty for
pedestrians to walk along this area. Emergency vehicles going to emergencies will also have
difficulty passing this area. Where will people park their cars, especially guests at hotels and
b&b’s? It is not required and a complete waste of money. It will also impede entrance to the
ferry terminal. There are many more reasons not to go ahead with this proposal a main
factor being none of residents living on the island neither want it or asked for it.
72 Parking is very limited as it is. Residents/businesses require parking that sustains all.
73 This is a complete waste of money. There is a high proportion of elderly people on Bute and
narrowing the pavement and road for a cycle lane that would be seldom used at the expense
of what is already there and adequate for prams, mobility scooters and wheelchairs is just
virtue signalling at it’s worst.
74 Cars parked on one side of the road and on the pavement at the other side of the road. Cars
continually speeding at ridiculous speeds along the road and it's only a matter of time before
someone is seriously injured or killed.
75 Not enough spaces for the amount of taxis that the island currently has
76 This junction is bad enough at the moment for near misses, it will only result in a few
crashes if they make the roundabout smaller/ reduce sightlines
77 This whole scheme needs to be abandoned, the vast majority of the community are against
it
78 Absolute nonsense. This will cause chaos at Battery Place and badly affect businesses
there. There is approx 20 miles of safe cycling road on the island.
79 Loal residents and accommodation businesses need the parking that will disappear from
Battery place. Note the word 'need', there are no alternatives. This section at least must be
cut from the plans.
80 New roundabout is far too small for buses to turn around.
81 If the public transport service was better then perhaps less people would drive. This would
lead to less cars on the roads and make it safer for cyclists without the need to cause
enormous disruption to create a cycle lane where it is not necessary.
82 The town in general needs adequate parking.
83 The pavement between between Ettrickdale and Ardmaleish has been broken and extremely
unsafe for years, this has to be addressed.
84 Public gardens and verges should be maintained to ensure the town is presentable to all
visitors.
Page 172

Page 173

70 | P a g e
www.connectedtp.com 
85 All railings along the sea front areas are in dire need of repair. They are not only unsightly
but unsafe.
86 It's quite obvious from all the comments by residents and business owners along E Princes
St and Battery Place that car-parking is a major problem. This needs to be addressed by
Argyll & Bute Council. This proposed cycling path along Battery Place simply creates more
of a resident problem with parking in favour of a minority of possibles that might actually use
this cycle path before it evaporates at the Glenburn Hotel. Argyll & Bute Council, listen to
your rate payers!! Bin this part of the cycling lane proposal along E Princes St and Battery
Place and, instead, legitimise the parking on the ocean-side pavement (already wide enough
to be shared by parked cars and pedestrians). Will you listen to residents? Or will you
bulldoze through your vanity project?
87 This Rothesay Pavilion to Glenburn Road Walking and Cycling Project proposal appears to
simply involve an expensive rearrangement of parking at Albert Pier without much gain (if
any) in additional parking. The proposal for a cycling lane along the ocean-side pavement on
E Princes Street and Battery Place is bad, ill-conceived and detrimental to residents in so
many ways. It’s dangerous and is a huge waste of taxpayer money. Cyclists currently share
the road with motorists. Over the past few years there has been wide publicity to ensuring
cyclists rightly receive better courtesy, awareness by motorists, and protection to avoid
collision with motorists to the extent that nowadays any cyclists sharing the road in Battery
Place are given a wide berth when overtaken by motorists. This proposal now has cyclists
sharing a dedicated path with pedestrians. Whereas before there was little chance of a
cyclist colliding with a pedestrian, a dog or a child there is (by the very design of this
proposal) an increased chance of this happening. This proposal continually touts increased
parking as one of its benefits without referring to the fact that parking along the ocean-side
pavement will be permanently lost for up to as many as 30-40 vehicles in high season. Yes,
there is government legislation banning pavement parking, but Argyll & Bute Council has the
power to legitimize parking for vehicles on the E Princes and Battery Place ocean-side
pavement which would be consistent with what has been allowed for decades. Over the
years various governments have encouraged the conversion of houses into multiple flats.
This has occurred in Battery Place. Where there was a single house with a parking need for
one or two motor vehicles, houses have been converted into three flats (for example)
resulting in the parking need for many more vehicles at the same address. With no other
parking available, residents and businesses have for decades been allowed to park on the
ocean-side pavement along E Princes Street and Battery Place. The concerns of residents
and businesses for parking need to be addressed by Argyll & Bute Council. It’s not
debatable whether there is a need for parking on the ocean-side pavement along E Princes
Street and Battery Place. The merits of this cycling path proposal are, however, highly
questionable and debatable as to whether it should exist here at the expense of required
parking. In Battery Place this vast pavement is 4.60 metres wide, certainly enough for
pedestrians to stroll along shared with parked cars. A stationery car must surely be
preferable to walk past for pedestrians than having to share the path with cyclists travelling
toward them silently and at speed…often unsighted. It’s easy to envisage an infant or dog
straying into the path of a cyclist with this proposal. A collision is inevitable. And how might a
cyclist take immediate evasive action? Duck off the cycle path and onto the road into the
path of an oncoming vehicle? If the avoidance of a potential cyclist/motorist collision is a
prime motivation for this cycling path, why not have cyclists share the promenade with
pedestrians. It is 3 metres wide and completely removes any possibility of a cyclist and
motorist collision. But, is there really any need for a cycle path along this short stretch of
road at all? The inevitable question that needs to be raised with this proposal as it affects the
stretch of road along E Princes St and Battery Place is “Why?” A lot of taxpayer money is
going to spent to achieve what? Are cyclists really going to benefit from a few hundred
metres of cycling path that ends at Glenburn Road? Are pedestrians better off sharing the
pavement with cyclists? Would pedestrians not be safer and better off sharing the 4.6m wide
pavement with stationery cars than with cyclists? Would the residents of E Princes Street
and Battery Place not be better off with formalized, legalized parking on this pavement
instead of losing it?
88 Buses currently move into layby, thus avoiding congestion along Victoria Street. With this
plan, a bus pulling in will cause the traffic to come to a halt.
89 People getting off the buses will be forced to walk across the cycle path
Page 173

Page 174

71 | P a g e
www.connectedtp.com 
90 Must maintain Taxi Rank "As Is" to cater for all taxis on the island. Proposal is for 4 spaces,
but there are regularly 5 taxis in place waiting for the ferry, and there are 10 licensed taxis in
the town. Taxis are important to foot passengers, many of whom are either elderly or have
youngsters with them
91 Would not want any changes made to the Winter Gardens or putting green area. This is a
tourist attraction in a tourist town and should be considered a conservation area
92 I can see no provision for parking along this section of the proposed route. The council has
not considered the needs of local residents
93 I think for this junction, that pedestrians and bicyclists should not have a route across the
ferry lanes; that is, the North facing side remains dedicated to vehicle traffic, and that the
north-west and north-east edges get their walls extended to section off the ferry ramp from
non-vehicle traffic. I am also not in favour of the access to/from the ferry lanes getting
smaller. Then, the pedestrian/bicyclist/other get a route from the north-west corner across
victoria street, across the high street onto the north-west corner of Guildford Square, and
back onto the north-east corner of the junction. I think this helps focus Guildford Square as a
starting/stopping point or a hub of travel on the route, along with it's other travel connections,
and I think improving the separation between vehicle and non-vehicle traffic in the north
facing area of the junction, without restricting ferry lane access is a benefit.
94 Difficult to see how the coaches parked here (according to the plan) will be able to U-Turn in
order to return to the ferry, given that the proposal is to narrow the road to "Standard". Note
that the coaches would also have to cross the cycle path and footpath
95 Putting marked parking bays in Victoria Street will encourage the introduction of pay and
display or other such chargeable parking. This will make it expensive to visit the town. We
don’t want it !!!
96 You said that you intended to narrow the road to a "Standard Width". Have you considered
the wider vehicles such as tractors and trailers that regularly have to use this stretch of road
from Argyle Street through Victoria Street and all the way out to the Glenburn?
97 How well will this be maintained afterwards? Who will pay for the ongoing maintenance Will
it be allowed to decay like the pavements on Montague Street and Guildford Square?
98 Rothesay is supposed to be a designated Conservation Area - Are you REALLY going to dig
up and remove the historic weigh bridge ?
99 How wide will the parking spaces be? The map doesn't seem to be to scale
100 Proposed parking spaces on this corner - Will they be wide enough for modern cars?
101 Increase the availability of parking spaces by enforcing restrictions on those who dump cars
here, park trailers and caravans, carry out repairs. Employ a permanent traffic warden.
102 This extension appears to be a complete waste of money. There is a beautiful walk for
pedestrians right along the sea front which could be improved. Improved parking for
residents/island visitors staying at the numerous guest houses would be far more beneficial
than a short length of cycle path to the Glenburn Road. The real danger is that you simply
encourage people to park on the road further down therefore creating a much more
dangerous environment for pedestrians and cyclists.
103 Move some of the taxi parking from Albert Place into this area
104 Reduce the unnecessarily wide, and poorly maintained, pavement area in front of the job
centre and telephone exchange to provide an additional and legitimate car parking area.
This would be extremely useful for visitors to the castle and relieve car parking pressure
elsewhere near to the busiest areas of the town.
105 Where do all the other taxis park if there are only 4 spaces?
106 Making the roundabout smaller will make it near impossible for buses and larger vehicles to
turn round 360 degrees as they frequently do without some element of reversing therefore
creating a new hazard.
107 Would rather you spent the money repairing the pavement/railings along Ardbeg Road which
was washed away in 2021. Temporary repairs are now 3 years old. This repair should
qualify for the funding you are chasing for this monstrosity that the majority dont want
Page 174

Page 175

72 | P a g e
www.connectedtp.com 
Summary of Respondents Views by Category
In order to enable processing of the wide range of comments received, an
analysis of the CFT comments received was undertaken.  From an initial review of
the comments a number of categories were developed to assist in categorising
comments into a format that would assisting reporting. These comments reflect
categorise the design team believe best summaries the points being raised in the
comments.  
By grouping comments into categories, a better understanding of the
communities’ overall views on the concept can be understood.  
Each individual locational specific comment will be utilised as part of any stage 3
design development.
A review of the data indicates that:
• 43% of the comments made related too issues beyond scope of the
project. This may include funding or considerations for a different route.
These comments accounted for 28% of the total CFT comments received. 
The proportion of comments is noted to be broadly comparable to those
received via the survey feedback and again indicates a lack of community
understanding of the projects aims and limitations.
• 32% of the CFT comments related to parking concerns (21% of all CFT
comments).
• 10% of the comments related to the concerns of the extended scheme to
Glenburn Road (6% of all CFT comments received)
• 22% of the comments expressed concerns regarding road safety. 20% of
the comments received expressed a concern for road geometry. Both
these items accounted for 14% and 13% of the total CFT comments
received. 
• 11% of comments related to the scheme not being value for money
whilst 14% of all comments received were related to congestion or
operational concerns. This equates to 7% and 9% respectively of all CFT
comments received.
A summary of this analysis by reported category is provided in the following
charts.  Page 175

Page 176

73 | P a g e
www.connectedtp.com 
Page 176

Page 177

74 | P a g e
www.connectedtp.com 
Page 177

Page 178

75 | P a g e
www.connectedtp.com  STAGE 2 – STAKEHOLDER FEEDBACK
Page 178

Page 179

76 | P a g e
www.connectedtp.com 
9 STAGE 2 - STAKEHOLDER FEEDBACK
Following the public engagement process, the emerging network was refined
through a workshop with key stakeholders. A range of engagement methods
were used for each group. These included:
• Face to Face meetings;
• Digital meetings; and
• Emails of proposals / details.
9.1 Project Consultees
A summary of the stakeholder engagement action by group and feedback
received is summarised as follows: 
Consultee Summary
ABC Roads Four workshops / meetings in total
concluding with no issues with resulting
concepts as presented to the public.  
ABC Fleet Public Transport No known issue
ABC Outdoor Access No known issue
ABC Planning No known issue
ABC Marine Operations / Piers and
Harbours
Consulted. Summary provided.
ABC Youth Services No known issue
ABC Community Development
Team
No known issue
ABC Economic Development Consulted. Summary provided.
Bute Community Council Consulted. Summary provided.
Bute BID Contacted. No formal response received.
Page 179

Page 180

77 | P a g e
www.connectedtp.com 
9.2 Argyll and Bute Network Management (Workshop 2)
• Due to carriageway construction and drainage arrangements, developing the
route on the A844 route on coastal footway side was agreed to be the
preferred route option.
• The operational carriageway width should be maintained at 6.5m in width
(5.5m is standard minimum) to give extra space allowance for HGVs and
Buses.  It was agreed that reducing the road width to 6.5m would improve
pedestrian crossing opportunities and help encourage lower vehicle speeds.
• Noting the potential impacts of the concept on the ferry queue area, the
Harbour Master and CalMac operator should be consulted to understand
better any operational impacts.
• Improvements to parking capacity along the route are supported. Any
changes should consider seasonal parking impacts and the demand for
coach and camper van parking where possible.
• Improved access options should explore the use of ramps and avoid the
suggested gate in the sea defence wall. This will improve connectivity for
cyclists and wheelchair users to access the winter gardens from the CalMac
terminal.
• The trees located along Victoria Road should ideally be retained as the public
may have concerns regarding removal.
• There is no limited to no scope to revert the roundabouts on the A844 to
Priority T-junctions. The town operates as a one-way gyratory and noting
the industrial activity to the north, the roundabouts must be retained to
support industrial traffic access onto the A844 from Bishop Street.
• It was agreed that there is scope to repurpose road space to better
accommodate different user groups.  This should ideally avoid the need for
the design to be widened into the front green / gardens.
• Any redesign of Albert Pier car park to maximise car parking capacity is
desirable.
• Exploring the use of herringbone parking layout solution at parking area
opposite Albert Pier should be considered.  End-in parking is undesirable and
should be removed through the design process due to safety concerns
relating to vehicle manoeuvring. This will most obviously impact on the
existing taxi rank.
Based on the feedback received, the concept design was developed considering
the above noted points.  The emerging design was again subject to review by
ABC network management and maintenance representatives.
9.3 Argyll and Bute Network Management (Workshop 3)
A third stakeholder workshop was held to discuss the approach to review the
emerging concept. The following points were noted:
• Due to limited road space, a cycle buffer strip width of 0.5m is promoted in
lieu of the 1m required for the road speed limit.  This change was suggested
acceptable noting the majority of the route would be subject to parking
restrictions which would limit cars parking adjacent to the cycle route.
Page 180

Page 181

78 | P a g e
www.connectedtp.com 
• The accommodation of the design within the existing carriageway kerbing is
noted to significantly reduce drainage concerns and overall project
construction costs.
• The proposed ramp solution at the sea defence wall just behind the Winter
Gardens in lieu of steps will provide improved connectivity between the
Esplanade and the CalMac terminal.
• The introduction of a drainage system is an option that ABC would support
but would increase the overall capital cost of the project.
• Improved and formalised parking capacity was welcomed.  The formalising
of on-street parking is noted to be a benefit. The improved parking capacity
at Albert Pier was noted to be beneficial. 
• Parking impacts at Albert Pier should be subject to further conversations with
ABC Economic Development team to confirm ABC aspirations to provide
additional coach parking.
• The Scottish Water building within the Albert Pier car park must be retained.
The design should be revised to include this.
• There is limited scope to resize the existing roundabouts but changes can be
considered subject to vehicle tracking analysis to ensure access by larger
vehicles can be maintained. 
9.4 Caledonian Macbrayne Ferry Operations and ABC Piers and
Harbours
A stakeholder workshop was held to discuss the concept and proposed alterations
to the ferry terminal junction and emerging concept. The following points were
noted:
• Supportive of concept overall;
• Have not been involved in previous Ferry Terminal to Joint Campus route
and have therefore not previous viewed the proposed junction design
produced at that time;
• Would prefer to see introduction of overhead gantry drive information
system also;
• No concerns raised regarding full time signalisation of all approaches;
• Noted the improved layout of the access junction is likely to reduce
marshalling support necessary at peak times.
9.5 ABC Economic Development
A stakeholder workshop was held to discuss the concept and proposed alterations
to Albert Pier and Coach Parking. The following points were noted:
• Supportive of concept overall;
• Kiosk at Albert Pier is currently being demolished. No fixed proposal for use
of space;
Page 181

Page 182

79 | P a g e
www.connectedtp.com 
• Scottish Water building on the pier is to be retained;
• Potential to increase coach parking from current 3 bays.  No details yet
available;
• Noted condition of the pier and structural integrity would need to
investigated art next stage;
• Noted ambition to include public shower and changing facility within the pier.
Details not available although it was agreed that the proposal will have a
‘small’ footprint and could likely be located within the concept.
9.6 Non-Council Statutory Consultees
A summary update of the non-Council stakeholder feedback received is
summarised as follows.
9.7 Community Groups
Community groups have been engaged through the public engagement process.
9.8 Bute Community Council
Three stakeholder workshops were hosted to discuss the concept. The following
points were noted:
•  like more time to consider Front Green opportunities within the project;
• Concerned regarding the use of the coastal side footway from Albert Pier
to Glenburn Road during inclement weather and high tides as the
footway can be flooded by waves and sea spray.
• Welcomed additional parking;
• Noted that peak season use of ferry terminal creates significant
operational challenges.  Concerns offered relating to increasing number
of car-based ferry journeys and limited infrastructure to accommodate
vehicle waiting to board the ferry.
9.9 Bute BID
A meeting was held with the Bute BID Coordinator who offered their personal
comments but was unable to provide an official comment on behalf of Bute BID.
9.10 Traditionally Harder to Reach Groups / Individuals
The Royal National Institute for the Blind (RNIB) was again attempted by phone. 
The resulting call confirmed that there is no specific representative for Bute
available to discuss potential design impacts.
It is noted that feedback received does include representation by minority groups
and those with protected characteristics.
9.11 Landowners and Affected Parties
It is noted that the scheme is located within the public adopted road.
SEPA Not Consulted. No change to road surface
area or water runoff are proposed. No
change to existing watercourse.
Scottish Water No response received
SSE No response received
Page 182

Page 183

80 | P a g e
www.connectedtp.com 
10 OUR LESSONS LEARNT
During the engagement plan, records of each activity were maintained to assist in the evaluation of how effective the engagement process has been.  The review
process included a single design team workshop session, where the teams’ thoughts and ideas were shared to assist in ‘destressing’ and improving future engagement
both during Stage 1&2 of this study but also all future studies.  
The summarised results of the workshop sessions are summarised in the following table.
Observation / Issue Mitigation
Face to Face meetings have been most effective in supporting feedback Maximise time within the Community
Lack of engagement with traditionally harder to reach groups Work with care centres to capture views of older and younger community members
including those with registered disabilities 
Under representation from younger adults Focused workshop with younger adults during Stage 2
Use of digital engagement materials, podcast, flythrough offers greater audience
participation
Progress service offers in the future using more interactive digital material
Facebook and social media study page offers limited value to project feedback and are
best reserved for use as event advertising
Use community pages as alternative to study page
Mis-information distributed via social media cannot be controlled if using community
social media pages
Minimise messaging and provide references. Social media also provides an "echo
chamber" for views and can encourage some respondents to adopt views of the loudest
voices rather than taking the time to fully understand the project for themselves
Project materials note being effectively engaged with or understood Consider using easier to understand materials to assist the public to engage with the
materials provided.  Options include videos and infomercials as alterative to presentation
boards
Terminology including "active travel" and "wheeling" are not well understood across the
whole community
Consider use of project language. Avoid use of Active Travel and explain on wider
mobility improvement in plain English
Working with local press can influence the effectiveness of published information. 
Reporters will revert to ‘making up’ information to fill in blanks.
Provide press information pack. Work with press reps direct
Page 183

Page 184

81 | P a g e
www.connectedtp.com 
Survey questionnaire design too long to be completed effectively.  Reduce the number of free form responses to aid in survey analysis. This introduces a
risk that the public perceive a ‘closed’ already decided survey.  Open form format
questions must be character restricted to 100 characters max. 
Page 184

Page 185

82 | P a g e
www.connectedtp.com  APPENDICES
Page 185

Page 186

83 | P a g e
www.connectedtp.com 
APPENDIX A – PROJECT HANDS UP SURVEY RESULTS 
Page 186

Page 187

84 | P a g e
www.connectedtp.com 
APPENDIX B – STAGE 1 AND 2 PUBLIC EVENT ATTENDEES LIST (EVIDENCE)   
Page 187

Page 188

85 | P a g e
www.connectedtp.com 
APPENDIX C – ISLE OF BUTE NEWS SAMPLE EXTRACTS 
Isle of Bute news front cover / Page 6 - August 23rd
Isle of Bute news page 5 –October 4th
Page 188

Page 189

86 | P a g e
www.connectedtp.com 
APPENDIX D – STAGE 2 SURVEY COMMENTS 
Within the Stage 2 survey respondents were offered the opportunity to provide a free text comment to three questions.  Each respondent had the opportunity to
provide multiple comments to each question. 
How is the design aligned with the needs of the community?
Very happy with the design
I think this design is almost perfect just needing some changes
I think this design makes it a way better experience for anyone on a wheelchair or just walking 
Creates a space for cyclists to ride without worrying about cars allowing more uneasy or scared bike riders to get out and ride.
very good
I'm really pleased with the design I like the design for the cycling route 
you don't need much space for cycling so yeah 
Key areas are hit, and will improve the speed of the roads.
The cyclists are discouraged to cycle as drivers are a tad too reckless, this would boost the quantity of cyclists & decrease and no. cars on the road.
im quite pleased with how to design is aligned
erterged
gfdgdsfgsdg
Concerned that this short section doesn't sufficiently benefit the community, a sign making the prom shared between walkers and cyclists would cost the price
of a sign and the money put towards the section up to school
i would like it if there was more nature
well done
The community needs, stuff for young people to do, not a pointless late for 50 year olds in lycra
Wasted money!
Not needed 
Not needed, waste of money 
This will only add further pressure to the town and surrounding areas to park your vehicle 
It's just a con like the Simpsons monorail 
We have been fine for years why would you try and mess up a good system. Ohh I know to line pockets with gold 
Not needed
This does not need to happen. Better more important things these funds could improve/fix
Waste of time and money, the saying don’t fix what isn’t broken springs to mind
Whoever is in charge has not contacted business at all to see how this would affect us
Page 189

Page 190

87 | P a g e
www.connectedtp.com 
It does not align with the needs of the community and you don’t seem to want to listen
Yes, front needs to be improved and design will help develop a more pedestrian front 
There is no need for this project, certainly not bikes on the island to justify such a large cost undertaking 
This will not improve anything, will just include a huge cost and massive disruption to the island. 
‘The community’ does not want, nor need, this.
Utterly ridiculous, uncalled for, waste of funds.
Not needed
Not needed the pavilion to pier already has esplanade that could be used and all along battery place has a wide pavement and a footpath 
Consultant clearly not interested in anyone with an opposing view
Totally unnecessary 
No
Not needed 
There is already plenty of room for cyclists.
We don’t need this crazy scheme.
If it aint broke dont fix it. People have been cycling and walking the route for years without any issues so this would be a waste of money
I am concerned that the views of the vast majority of the community are actively being ignored, Mark literally says in his video presentation that if 99% of the
respondents don’t want it then is that really a reparation of the community, we can almost guarantee if it was the other way around he would say that that
was conclusive to the community wanting this scheme. From my own research and understanding from the community of Bute that I have spoken to face to
face and who’s comments that I have read online this is not wanted, and the fact that in his own words Mark admits that the community said they did not
want it during the first consultation that it has gone to stage 2 is staggering and is telling the community that their views simply do not matter and that as a
group you will do whatever you like. This is a democratic process, the community do not want it and so far you have been unable to legitimately answer
concerns and questions raised. Mark has been quoted in the paper saying that it doesn’t matter if this will be poorly maintained it should still go ahead, this is
an absolutely ludicrous comment to make and reinforces the reason for the scheme not to go ahead in the first place! This scheme will not be of any benefit to
Bute or it’s community.
No, we already have wide pavements right along the route, a prom etc that are away from the road that cyclists already use, this is a waste of time and much
needed community money and resources.
Again this is not needed! Please listen to our community and provide us with something that will benefit us. 
It's not need at all!  The roads are great as it is for bikes amd the very wide pavement are all ready perfect for children to, bike, scoot, skate safely. Please use
this money for something the community and locals actually need! 
Don’t need it
Fix the prom and it will be good as it is
Its not needed .
Completely unnecessary 
The community doesn’t want this.
Money could be used on other things
Page 190

Page 191

88 | P a g e
www.connectedtp.com 
Not needed total waste of money 
Absolutely not. 
It really is not necessary. There is a perfectly adequate walkway from the glenburn to the esplanade.
The island needs other amenities before this nonsense.
Other routes are required 
Roads in Bute are pretty quiet compared to other places so cyclists have no problem on the road for this short proposed route. I would onlt5reduce pavement
on Battery Place to aliw
Complete waste of taxpayers money as is the consultation process
Total waste of time
Completely uneccesary
The roads are wide enough for both cars and cyclists and the pavements are wide enough for prams, wheelchairs and pedestrians
Concerned enough that the road will be narrowed, basically there is no need for this
Waste of money
I am very concerned that this plan is even under consideration as it is totally unnecessary and unwanted
NOT NEEDED
Not required
Rothesay has an elderly population many of whom require use of their own cars, also busses and taxis. The road is currently adequate for the tiny proportion
of cyclists using it. These plans will destroy valuable car parking spaces in particular on Victoria Street & Battery place, and will also lower the number of taxi
rank spaces to more than HALF the current required demand for daytime.
It is not required. Butes residents and visitors have managed without a cycle lane where it is proposed for ever. There has never been an accident yet. This
whole idea will impact travel, social care and emergency services in a very negative way. We don't want or need a cycle lane.
The project is not required 
No one has thought about the locals only about the tourist side of things.
The area is already designed for a safe walking space why do we need to waste more money on it, instead of improving the island in other ways 
Very concerned at the negative impact
Waste of money. There is ample safe space just now for walkers and cyclists everywhere on bute my 9yr old does it regularly without any issues 
Project is primarly geared to making cycle lanes without any improvement to walking
The community should have been consulted on what improvements could be made before appointing consultants to design cycle lanes then ignore initial
feedback and launch a design concept
Bute does not want this 
Not needed
This is a total waste of public money, considering the state of the roads and pavements on Bute. The money could be better spent elsewhere. The public
should have had far more say in this venture.
Bute is already a great place to cycle and walk. We don't need this. 
No one asked for this to be added
Page 191

Page 192

89 | P a g e
www.connectedtp.com 
The pavement is already 8ft wide and there is also the prominade 
No one asked for or wanted this
We have an ageing population on Bute, most young people drive everywhere. No one will use this
The concept of safe cycle zones is great but where you have positioned it is ridiculous.  Make a cycle pathway from the schools.  Or fix the road at Ardbeg to
allow for both cyclists and pedestrians to walk safely.
This plan is absolutely ridiculous and whoever was brought in to make these plans really has no grasp of what our community actually needs.
I have brought up a family over the last 20 plus years and we’ve cycled, walked and ran from Craigmore to Port Bannatyne on numerous occasions without
needing these suggested adaptations. We, as a family, have completed training for half marathons, sponsored cycle runs and raised extensive funds for
charity. What we have on Bute currently is ideal for this type of training. 
It’s a waste of money 
Community do not want this 
It does not address the needs of the community one iota. Repairs to the sea wall on Ardbeg Road, doing something about the former Royal Hotel and The
Pavillion plus an elderly care home on the island would actually meet the needs. Not this utter nonsense.
There is already a good promenade for walking. Except at Ardbeg Road where the storm damage from several years ago has yet to be properly repaired. But
you ate not interested in that!!!
Not essential in the slightest 
Not required 
Absolutely no need to waste time and money on a stupid idea
Our pavements and shore side walking are big enough for walkers cyclists belong on the road there is no real issue with heavy traffic on Bute
This project is not required. I understand that if this money us not used for this purpose on Bute then the island gets none of it - that is preferable to the
chaos that this ludicrous scheme will cause. The promenade and battery place to craigmore pavements have more than enough room to have a cycle lane
painted - no need for any construction - 
Totally not required
There are far better things to spend this money on 
Waste of time and money 
I think there are other projects that would benefit from spending this public money, no need to restrict traffic further with these plans
Waste of time and money
The community does not need this ! 
Total waste of tax payers money 
It’s really not needed and if it’s a way to get funding to include road repairs be upfront and say this is design is being used as a way of fixing the roads!
There is adequate walking,cycling and mobility transport without this design.
The community clearly doesn't want this
Bin it 
We don’t want it. 
I don't think the pedestrian crossings near the ferry are safe. 
Page 192

Page 193

90 | P a g e
www.connectedtp.com 
Not extensive enough.  Build a pavement to the Eco houses at Loch Fad so children living there have a safe way to walk to school.  There won't be enough car
and disabled driver parking or coach parking or campervan parking in your scheme which will cause chaos!
What a waste of tax payers money, if it’s not broke don’t try fix it, funds can be relocated and spent where needed, and 10 years to complete the proposal as
quoted by mark is a joke 
Not required or needed
Not rewuired
Other areas need attention not just the front 
You. An only improve when base is solid 
As above, the roads need improved across the whole island to improve cyclist safety. Loose gravel clippings, uneven surfaces and potholes have caused me to
damage my bike and skid dangerously.
I must say that whatever this consultation costs, the salaries of those involved could maybe explain where Victoria Road is, there is a Victoria STREET but
that’s not mentioned,.
Reduction in main road through towns width. Will cause congestion at ferry terminal entrance at busy periods. Smaller roundabout recipe for disaster for larger
vehicle. 
Don't think it will help at all, if you want to cycle uou would want to go further than Pavilion
Rubbish idea,can't even get names right Victoria St not Road!
A waste of resources 
Completely against community views
The community has made it clear that this scheme is neither wanted or needed.
Cancel waste of money
The community want the money spent elsewhere
What happens to the taxi’s you are now making redundant? There is only space for 4 taxi, on average there is 8 taxis minimum on at one time - all very busy,
who will be responsible for these redundancies? How will these companies continue to provide a service with half the service ? 
Based on responses on Facebook group this is not a welcome development. 
This is not in the best interest of the community
Pointless
The roads, pavements and Promenade are absolutely adequate!
Completely a waste of money and you know it
We don't want it
Completely unnecessary and detrimental. 
With our climate and number of aged people cycling is highly unlikely to increase to the extent required to justify this waste of public funds regardless of what
virtual piggy bank it comes from. 
Very concerned
Narrowing of road & roundabout and not enough parking which is required for overflow for ferry!! 
Sort the Promenade for all walking, wheeling, cycling to enjoy and mobility to enjoy
Page 193

Page 194

91 | P a g e
www.connectedtp.com 
Perfectly good promenade that could be used
Use what we already have a prominade
Rothesay has a huge obesity and ill health issue the more we can encourage people to walk or be active the better
We have to remember many people do not have access to a car or cannot drive the people shouting loudest here have cars
This proposal is Not needed in Rothesay
No consideration how removing parking spaces will impact the community as we will lose safe parking spaces in a town which is already struggling to
accommodate the many vehicles you find on island particularly on weekends 
As stated before there is no need for this in a small island community. The distance proposed is miniscule and will not improve the experience of walkers or
cyclists in any form.
Who has proposed this and why?? There are more urgent priorities to spend money on. 
Need to put it on the prom not change road/parking
No need for this, many more things in the town are needed or need repaired
None
The proposed design and measurment are a waste of money.
They do not aligne with the needs of the community.The paths , pavements and roads are perfectly adequet for pedestrians and cyclists as they are.
Meets no needs for the community 
Waste of money 
Total waste of time and money and especially when the pot holes on the road are always a temporary fix it’s a disgrace and to think we pay our taxes for this
nonsense 
You only need to look at the cars parked o. The pavement it’s simple we need more parking for cars and viditord
Don’t believe this is needed or wanted.  Most cyclists don’t use these layouts, preferring to use the normal road network 
The real needs of the community are being overlooked here.  
Waste of money 
We have a prom for walkers, we need parking 
Insane idea 
What a complete waste of our council taxes - appalling stupidity 
Rothesay is a fantastic town to walk and cycle around at present
The local need is not for upheaval to create cycle routes which will not be utilised to their fullest. Better planning of parking areas and development of the
town would better serve the community
It's not needed
Not needed 
Not needed 
Definitely Not
This is of No use 
Page 194

Page 195

92 | P a g e
www.connectedtp.com 
Doesn’t meet community needs, more an exercise in using funding
Simple solution would be to enforce current parking restrictions 
Our community does not need a cycle pathway. 
We already have pathways and walkways. We do not need this project. 
As usual with these things, pushed through when more pressing matters are of concern, another vanity project
Not needed
See above 
What is there is already more than adequate and to implement this plan would be a waste of tax payers money which could and should be used wiser 
Can't see the need for this with the cost involved, has there been any accidents?? The island lacks In care for elderly and nothing to do for kids, why not
address the things that matter
These are so.e of the safest areas for cyclists, would be better spent for school road. 
The community of Rothesay and Bute as a whole has far greater needs elsewhere where funding is vital but lacking. Crumbling sea defences still to be
repaired after three years, play spaces for children, social spaces for teens, care for those with disabilities, adequate care for the elderly, incentives for small
business owners, restoration of derelict buildings, community wellbeing projects etc should all take priority over this project and be more worthy of the
funding.
There is no need for the project at this location. There is already ample space for walking, wheeling etc along the pavement, roadway and esplanade.
It Isn’t Needed Or Wanted
Whoever Designed It Is A Fuckin Idiot
From young to old most are drivers on Bute not cyclists 
I hope enough people object to stop this from happening we don’t need it 
Not a requirement the islanders require 
Unuseful project
Not aligned at all with community needs
Waste of money 
I’ve observed, both as a driver and a cyclist, that most people are very tolerant of other road users, especially in Rothesay.
There are very few accidents inRothesay. Statistics should be a considered as a measure of need.
The community do not want these changes but they are being forced through by some mandate which is, no doubt, financially driven
There is no evidence to support the need for change.
Not much of a problem actually exists but you are generating plenty of new problems.
Not much of a problem actually exists but you are generating plenty of new problems.
Irrelevant
Not interested
A lot of nonsense and not required
Waste of my tax paying money
Page 195

Page 196

93 | P a g e
www.connectedtp.com 
I believe my displeasure at the misalignment of your proposal with what this community needs have been clearly expressed already in this lazy, cobbled-
together survey
Read all comments already stated
Not listening to the community
Tell me why it's required? 
You are creating something just to justify your contract 
There is no need for this in our town we have adequate facilities 
This is not needed and should be scrapped
This is not required , it will make walking more dangerous 
Concentrate on actually improving the town not wrecking it. 
Waste of time and money 
11 Taxis on the island, the planners assumed 7 so 4 spaces on a rank is ridiculous 
Absolute waste of money. The current pavements need to repaired and more wheelchair friendly lowered curbs out in place. To improve safety for elderly,
disabled and particularly sighted or blind. 
Would suit you better to fix the pavements for elderly and wheelchair chair users
Please listen to our community - this would be a gross misuse of public money
The ridiculous proposal of a cycle lane when it isn't required. Argyll and Bute council you are an absolute joke
Money could be better spent elsewhere.
Unnecessary.
Last thing the island needs is this pathway
This is a walking community already.
Total waste of money. Not needed and not wanted
The community does not need more routes for cyclists or walkers due to already having a pavement and road. I'm concerned that money is not funding the
correct projects on Bute which would meet the needs of Bute.
The design is not needed as the route is already wide enough for cyclists and walkers to be safe and its accessible.
The money spent on design and consultation is already a waste of scarce resources.
Proposed area is already very safe & pedestrianised to sea front
Very concerned - disruptive & unnecessary 
If the roads, pavements and the prom was maintained properly 
We already have the facilities in place. You are going to narrow the access to the pier. On busy weekends cars are queued along Victoria Street waiting to get
on the ferry. Examples Bute Feast and Highland Games, Bank Holidays. This is a holiday resort. Also an island that needs it town to be accessible and useable
by all. Not hindered by fewer parking spaces and narrowed roads. You are going to affect the businesses in the town. Just because there is funding for this
bike path dies not mean it is needed nir necessary. .  Holidays. 
Nonsense 
Spend the money properly on something that is needed for the town
Page 196

Page 197

94 | P a g e
www.connectedtp.com 
The town centre is in decline, mainly due to the state of the Royal Hotel and empty shops, this is the last thing money should be spent on. 
Plenty of space to walk no need for anything else
Who will enforce parking on the pavement, it is not a police re4sponsibility and we have one traffic warden who only visits once a month
People are going to get hurt need to walk on the road not the pavement 
Cyclists are already a nightmare whether you are a driver or a pedestrian, I don't see how they benefit me anymore than they do now whilst out enjoying
walks with my dog and family
Why waste money on this design, it would be better spent improving safety of children to and from the joint campus which is an absolute nightmare with the
cheese factory too. It's dangerous and need improved urgently. This way kids could walk/cycle safely and maybe help parents feel safe for their child to do so. 
Not required at all ..cyclists cycle on the road there is more important things to spend money on 
I feel there are so many other ways the money is needed on the Island. This is a waste of money and time. 
The entire thing is not appropriate
This is not aligned with any of the needs of the community!!!
Not needed add a cycle lane to the promenade - if necessary. 
This is neither wanted or needed
this is neither wanted or needed 
No need this is just ABC wasting money.. our island use to look beautiful NOT now. U pay a dog and traffic warden and yet our town is a DISGRACE!! 
None of it- washing money ABC just like you have on the pavilion. How about reducing prices for the Bute Highland Games in OUR PUBLIC park.
Absolute waste of funding. I used to cycle along the whole bay for work for years never had an issue along any of the front roads. Even as a child I felt safe
cycling. This is really a wast of money and is going to affect the local community not help it. 
It is not necessary. 
This should never happen. It's a waste of money and not needed. I don't know what benefits the people working on this get for forcing it down our throats but
Bute is NOT happy with this.
You clearly have no idea what your proposing as it is an utter waste.
I think our island lacks in parking spaces for vehicles and you close the street off for a cycle lane is ludicrous!! The worst idea yet. I'm sure the funds can be
used on much more needed things to our island 
I think you need to rethink your ideas as our island is deprived enough let alone adding this to the situation 
If this is all you can come up with to improve our island, then there is something very, very wrong!!!
Waste of money, use the money to provide essentials to the community that pays council tax.
Not neede
Not needed
Fixing the current pavements and installing more dropped curves would be more beneficial
Once it gets damaged you won't fix it, same as the current situation. 
No one in the community wishes this 
Worst project ever proposed pathments should e fixed and roads before this 
Page 197

Page 198

95 | P a g e
www.connectedtp.com 
I’m concerned that this is being pushed through regardless of what the community wants, 
Not needed! We have many places to walk and cycle which are preferable to the proposed route. 
They is no issue so why change it
Pointless
You parked on a bloody footpath and have shown a lack in understanding of the highway code
The roads are wide and quiet. The Lycra brigade will not use a new cycle route. Pedestrians will wander along oblivious to cycle markings listening to
headphones . Money that would be better spent elsewhere on Bute will be squandered
Cycling route and car parking provision is clear but not the other elements
There’s already wide pavements along this route
This project shouldn’t go ahead
Ridiculous  cycle route not enough traffic
Rubbish idea
Not needed 
What prat came up with the idea 
ANGRY that this money is being spent on something we do not want or need. There are many other things we are in need of in the island rather than a
useless expensive cycle lane.
We do not want this on our island 
There is no need to make this change. Community doesn't need this. If anything improvements needs making up high St for route to academy. Not along the
front.
Waste of time and money- upheaval to do works is not worth it
Money is desperately needed elsewhere
No need for it. Perfectly adequate 
Inverclyde set up a similar routes that cost thousands, to be only used by a handful of cyclists. This has increased congestion and reduced parking in allot of
areas. It was classed as a very expense of verly little value in return. 
That the council and project manager are not listening to the community, and are hell bent on pushing this through. Just like the route from the town to the
school, taking no account of the access through parts that would be unsafe in the dark winter months. 
Not needed in this area 
This is NOT needed on the island !!! Put the money to other much needed things 
It is an unnecessary impingement 
It is not needed
Money should be spent in Other problems 
Money should be spent on other projects
Waste of money some of the town is falling down
Cycle lane not necessary, educate cyclists to safely move over when appropriate for vehicles to pass.
Page 198

Page 199

96 | P a g e
www.connectedtp.com 
If it's not broke, don't fix it.
Leave Bute don't come back 
Wasted money 
Totally not about the community
Cornc
The community doesn’t need a walking/cycling track
Access to the ferry terminal is problematic when demand is high and the ferry terminal is full. Cars currently queue ad hoc on / Victoria Street until space
becomes available. The current width of Victoria Street allows this without any problems
The only issue at the moment is the poor state of the pavements and roads (Pot holes and uneven paving), which is caused by poor / lack of maintenance.
Resolve this, and walking / "wheeling" / cycling becomes much easier
Not needed
Not needed, we have l big wide pavements, this is a disgraceful waste of money
It doesn’t improve what is there and is a waste of money
The community has not been engaged and its requirements are not known. 
We do not need this, and it is Victoria Street.
Don't waste money 
Waste of money 
Waste of money
I don’t believe this is a good idea to the town as it’s cutting off more parking spaces and it’s leaving the taxi rank with only 4 spaces. 
Not needed not good for tourists parking not enough space to widen for a cycle path!! Rubbish not needed 
As above!!! Just LISTEN to local people 
LISTEN TO THE COMMENTS 
This would be an embarrassing waste of money
Don't think it is beneficial 
Overall there is nothing wrong with what we already have.
This design is not required for Rothesay.
This is a serious miss use of funding when there are pavements roads and buildings falling apart all over the town centre. This is not a priority for the
community and points of views should be adhered to as we the community need to live and use these areas daily 
Ban parking on the pavement at Battery Place once access to designated are on the Esplanade 
The whole point about cycle friendly roads should be the laying of decent tarmac surfaces, thereby avoiding potholes. 
Cery
Won’t benefit anyone
Nit at all needed
Scrap it
Page 199

Page 200

97 | P a g e
www.connectedtp.com 
Not necessary.
Probably take over 5 years to complete 
Extremely concerned that the planner’s have not did their research and assume there is only 7 taxis on the island and only 4 work at a time. There is 11 taxis
in total. Where would the other 7 rank ???
There is ample footpaths for walking and cyclists will not use a path. This is obvious from what i have witnessed on the mainland 
Absolute waste of money. This will not benefit the community and the funds could be better utiliised in many ways
This is a solution looking for a problem. Money could be better spent elsewhere.
This is NOT wanted or needed.
This is not necessary there is plenty of space for cycling and walking. Focus on more important issues 
Concerned for business which will be affected by the scheme
There have been no cycling incidents on the island for years, most yous the pavements when necessary. It will loose the taxi company business and the
business surrounded by shortening pedestrian crossing
Waste of money & no one will use it
I cycle all over the isle and there is simply no need for this consultation, it really concerns me that after the debacle that was the school walk cycle route you
now plan to "enhance" and already sufficient route and seem to be pushing on in the face of public dismay. Your premise is flawed we do not want or need
this enhancement and would rather see cash put into existing services that are being cut i.e, Police, lolly pop men, public conveniences, gardeners,,,,,, geeze
this list could go on but you get my point, so please listen and stop!
There is zero need to improve the already good service that exists 
This seriously is not needed on this island and is a complete waste of money. The most concerning point is I don’t know one person on the  island that is for
this yet it seems to be going ahead  
Money couldn’t be well spent elsewhere
There is absolutely no need to do this to the front of the town. Just leave it alone, we don’t need it, don’t want it. It could affect business with the taxi rank
and other parts along the route. Someone is profiting from this and there is no need for it at all
Waste of space time and money
Waste of space time and money 
There are no issues with the route currently
Without exception anyone I’ve talked too is utterly bemused as to why this project is being funded. Its aims could be achieved by simply maintaining the
existing route in an overall better condition. 
The Isle of Bute has far greater concerns than the road/pathway system we should be able to choose where and what the council puts investment into. 
If people aren’t currently walking and cycling on this route design won’t change things. It’s not a communities route.
Why this route. It’s not the main route in the town. From the town to the campus would make more sense to focus on. It’s very busy during that e day and
when children are going and coming from school.It needs to be made safer and cycle/walk friendly.
Just a way for the fat cats to make more money regardless of the community's feelings
There is no need to build something else, the payments we have already are suitable for wheelchair access and pedestrian walking. If maintained properly
there is non need for this honest farcical proposal. All you br doing is creating more issues for something that would not benefit anyone. I cycle and have
Page 200

Page 201

98 | P a g e
www.connectedtp.com 
never encountered a problem that would require a separate lane. I also push my kid about in a pram along the proposed new walkways and again no issues
doing so. There is no need to waste money here.
This is an honestly terrible design and serves none of the intended purpose
Public seem to be getting ignored by organisers 
Not needed and not practical 
The present if sufficient for walking and cycling 
Waste of resources 
Cyclists will not use it they prefer to disrupt motorists by blocking the road cycling 2 & 3 abreast
Idiotic design! The amount of “give ways” on the cycle route that cyclists will take absolutely no notice of. If you observed the local zebra crossings you would
realise that cyclists take no notice and pass through when pedestrians are on the crossings. The roundabout die to be reduced is already too small as coach
drivers have to conduct a 3 point manoeuvre in order to turn. 
Concerned that this scheme is ignoring some of the critical issues already being experienced around standard of existing pavements etc in order to promote a
'blue sky tick.box scheme'
Rather than looking to make more obstacles funding would be better served improving the pavements, roads, drop kerbs etc
Community doesn’t want it 
Poor survey design there. Am more than concerned. Totally oppose it 
There are so many better things that could be done with this money.  The traffic on Bute does not warrant spending this sort of money on a "solution" that
probably less than 1% of the population will see any benefit from.
I don't believe this will benefit our community at all a complete waste of money that would be better spent elsewhere such as play parks etc
Typically cyclists use cycle paths to avoid pedestrians 
Again, not required 
Not needed
Many in community agree change are a waste of money
The road and pavements are already adequate 
2 way cycle lane I feel would be more dangerous than what we have just now
Are we suddenly going to get hundreds of cyclists coming over. The community is mostly elderly and getting older all the time. Not all will be able to cycle. We
already have racing and many bikes that have enjoyed the island as it is. 
It will not meet the needs of the community 
The promenade is wide enough already. Not required. Cyclists have no problem as they weave where they want to anyhow
There is absolutely no need for a cycling path on this stretch of road whatsoever. 
There is absolutely no need for a cycling path on this stretch of road whatsoever. 
I do not think it's needed 
Upheaval, mess and it's not needed 
As mentioned before most people ride their bikes along the seafront because let’s be honest that’s why they come to Rothesay. This is a pointless tick box
exercise and a complete waste of public money which would be better spent elsewhere. 
Page 201

Page 202

99 | P a g e
www.connectedtp.com 
As previously mentioned there is absolutely no need for a cycle lane here. It’s hardly Hackney. The road traffic is not high enough. 
Seems only to benefit a handful of cyclists
Plenty room at the sea front for cycle route and pedestrians.
Reducing parking spaces is detrimental to the town.
Just why?!!!
Roads and pavement wide enough 
Wast of money no need for a cycle lane 
Everyone is concerned, this is not aligned with the “needs” of the community in any way shape or form
It will improve nothing
Very poor and ill conceived with poor value for money 
Why not survey existing users and community ?   Ferry users are notoriously friendly and a captive survey audience 
It will reduce parking & cause congestion 
How can it improve walking when the pavement is being used by cyclists.
The community has made it abundantly clear that they do not see a need but they are being ignored by an unaccountable organisation that appears to do this
kind of thing all over the country for no good reason. Well no good reason for the community but clearly it is profitable to Sustrans.
Mega concerned 
Rubbish 
Money could be well spent on town
Just going to cause trafic congestion which will increase accidents
Not an appropriate idea at present for the town centre
Esplanade as it is has always been able to accommodate pedestrians and cyclists.
I think the money spent so far has been a complete waste
Whoever has come up with this project does not seem to know the island as a cyclist at all
We don't need it.  Money could be better spent elsewhere
We have a perfectly adequate space available at present
I see on average 6 to 8 cyclists / week in the height of summer. The majority of them tourists. Rothesay is a quiet town. If a cyclist is cycling along the
promenade and people are walking, a simple ring of their bell currently works to alert the walkers. In my opinion, money would be better spent on improving
the existing promenade surface and painting on a cycle lane
I think repairing the current surface of the promenade and painting on a cycle lane (as Troon and Largs has done - which is extremely effective by the way)
would offer the same benefits 
It will hinder drivers, hotel, guest houses, air b&b’s
Leave our island roads alone. 
This is a waste of money
I feel that the majority of the community prefer to use their car and won't see this as a benefit
Page 202

Page 203

100 | P a g e
www.connectedtp.com 
Yes, within the proposed developement
Scrap it
There isn't a problem
It doesn't need improving
Waste of money
Plenty of space on existing prom
Population is mainly elderly people who do not cycle
We don't need this
We don't need this
It isn't aligned to any relevant local transport priorities 
The community have been very vocal in not supporting this move, yet we are being ignored, even with our genuine concerns. It is quite clear that this is
already going ahead regardless of what we say.
It does look quite expensive given all the other priorities that we are told there is no money for.  I think a slimmed down version would stand more chance of
getting community support and funding.
Not aligned with community
Not needed
See previous comment. The only complaints I've noted from cyclists have concerned the uneven condition of some of the island's back roads, well out of the
town centre.
The design is a sledgehammer to crack a nut. Traffic volumes are low, cycle volumes are very low. Cycling/walking along the whole of the stretch is already
both easy and safe.
I think it will future proof the uskanx for future changes in transport
I thinkbut future 
Bute is very popular with cyclists and has been for years. Groups come regularly and cycle round the island with no issues. This scheme has been dreamed up
simply to tap into funding
Totally ludicrous proposal
If the surface and layout were improved this area already caters for pedestrians and cyclists especially if you remove parking in the pavement 
There are other places on Bute more in need of improvement 
No concern 
Will be excellent for community 
Plenty of paths already 
Making roads narrower and dangerous
Not needed
Already used by all the local community, no need to change anything.
Not required on Bute. 
Page 203

Page 204

101 | P a g e
www.connectedtp.com 
DThis has to be the most ridiculous project yet.  I have seen the chaos of addding these cycle lanes have made to Aberdeen city. Fix Rothesay pavements
In an aging community fixing pavements and walkways are uppermost.  
There is a wide promenade to cycle or road no need for cycle path
This is waste of our money
There are so many paths and ramps that these changes make zero difference.
You have not taken on any of the negative feedback that the whole community has given you.
its not broke so no need to fix it 
The current situation offers a great walk, wheelchair route, walked it all my years living here and enjoy it every time 
Feel like it’s a way of lining the companies pockets with absolutely no interest in the community 
It would help after looking at the drawings etc but the prom is already sufficient for cycling and walking 
This doesnt appear to provide enough parking for future pavilion demand. 
Mark out a route on esplanade and save a fortune
Unnecessary
Waste of money
The amount of people using this area of footpath is very minimal. Most people use the promenade to walk on so to convert this is a brilliant idea
Some of the ideas are good but not all 
Wasted money, address the problem with roads and pavements, money better spent.
Waste of time and money 
Very much in line with parts of the community, including me. I see that only 1% of the resident population responded to  the previous consultation. This was
hardly representative. At this week's consultation, I noticed a few very vocal objectors. They don't speak for me. 
Yes. There needs to be better segregation of motor vehicles from pedestrians and particularly cyclists. Cyclists are currently very exposed riding in Rothesay.
Nobody here has asked for a cycle path on the area you are proposing
It's not needed 
Some absolutely stupid idea to waste money 
What a waste of time and money 
Community being overlooked again
Going to be an absolute disaster 
Not wanted or needed by the local community 
Scrap it completely
Money would be better spent elsewhere. The seafront and prom is crumbling and needs urgent attention more than this.
As said previously Bute needs kids soft play or similar rather than this,I live and work in Bute and cycle daily with no worries or issues about my safety and see
plenty of families cycling also
Not necessary and waste of hard to come by money 
NOT NEEDED, SCRAPIT AND USE MONEY MORE APPROPRIATELY
Page 204

Page 205

102 | P a g e
www.connectedtp.com 
Present facilities are adequate for everyone in every category mentioned.
No I don't there will be any improvement 
Absolutely not. I am a walker and this would impede me from walking along this area, no room for prams and wheelchair users.
I feel that this whole idea is a vanity project, ignoring the vast majority of islanders who have lived here for many years. It would impede on parking for
emergency vehicles and care workers going to clients and emergencies. Walkers, wheelchair users and prams would have limited space. It is. It people
friendly. We have a large elderly population on the island who do not and cannot use a bike, they depend on cars and mobility scooters to get from A-B. 
The wrong area for a bike lane
Will cause more issues
At the moment I find it difficult to use the pavements in my wheelchair as they are in poor repair and every bump can be painful when already in pain. The
proposed changes just so happen to start near my house at 8 Mountstuart Road and as long as it’s easy enough for me to cross the road to access it, I’m
hopeful that it will encourage me to get out more in my wheelchair which is much more sociable rather than needing to be driven
For me personally I think it will make an improvement but I think people locally are concerned about the impact on parking spaces
‘Concerned’ doesn’t cover it - I’m dismayed and frustrated at this proposed waste of public money.
As above. This is not needed, will not provide significant benefit and will make some areas worse (e.g queuing for ferries and parking at Battery Place)
Concentrate on the prom.
This is going to be a huge waste of money, why not upgrade the walk/path ways we already have going out towards the Glenburn and the pavillion? The
island needs the money spent on a lot of other areas rather than a cycle path
It’s not needed
Not required 
As a non driver and a regular walker of this route I think the idea of needing a dedicated cycle path is ludicrous and has clearly been drawn up by pencil
pushers who have likely never been to or spent much time on the island 
As Above 
As above 
Clearly, done by someone with no care for Bute.
Totally agree with it. We don’t need it, we don’t want it, it impacts negatively. Try listening olease
Will make life worse for the islanders
Improving access on a route where it’s already good. Plenty other paths and routes need I lroved
No requirement in that route for this there is in other areas of the town
Absolutely flabbergasted at the fact that it has even got to this point. A shambles. Total and complete waste of money that could be used elsewhere. Will
affect the roads that are already affected with heavy traffic when the ferries are busy. 
I have heard hundreds of people taking about this and all were against it. This has to be stopped. 
This project is not wanted nor needed. The money needs to go elsewhere
Has the design team tried and tested this route.  I think local knowledge has not been well enough considered regarding this work.
Repair existing footpaths is more important than cycle lanes.
Not heard any positive aspect of the inclusion of the plans
Page 205

Page 206

103 | P a g e
www.connectedtp.com 
As above. Please listen to the people who live here, this is not required or wanted.
It is not safe to share a walking path with bicycles. What about the buses turning at the island, how is that going to work if you narrow the island. People who
live and work here depend on current bus routes.
Waste of money, not needed
Please start listening to voters not activists
Traffic on island isn't busy enough to fuss with this nonsense
I think anything encouraging safe cycling on the island is a wonderful thing we have a great deal of selfish drivers but sadly my opinion will be in the minority
as people here don’t walk the length of themselves never mind cycle if they can drive here 
I think it’s a start in the right direction too many drivers on a very small island 
Not sure why some people are objecting so strongly. The council still has the same duty to upkeep the roads and mend potholes, doesn't it?
£6 million
Money should be spent on prom roads that are horrendous on this islanDel
Completely unnecessary 
Did whoever thought up this idea even visit Rothesay and look at what the town really needs ,ie the state of the Royal hotel, the empty shops,trees growing
out of buildings and they think a cycle lane is the main priority then they should try living here
There is very few who cycle in the town. 
It's a waste of resources money could be spent on other pressing matters 
It's a waste of resources money could be spent on other pressing matters 
Don’t know who came up with idea but absolutely no need.
No need for all this.
The local community doesn't want this
If this goes ahead in Rothesay it will be another example of the shambles of our council
Your trying to fix a problem that’s not broke and improvise a change that is not needed
No improvement. Will have negative impact for the residents.
There was no box option for Displeased ! Please amend your survey
Not needed
Total waste of time
Waste of money 
It is a waste of time and money and other things can be done. I cycle and have never felt it needed. Why is this even being proposed? Noone has asked for
this. Seems to be a waste of time and some way of laundering money I'm sure. Despite what the community has said I am sure you are still going to do this
as I'm sure some money has gone under the desk to make sure certain companies get the work. I even doubt you will read this. Rather than add this why not
fix what needs fixed first
We have other issues that should be dealt with 1st
Action re pavement parking required 
Scrap it.
Page 206

Page 207

104 | P a g e
www.connectedtp.com 
Scrap it.
No benefit to community 
Will not improve anything 
The community needed to be asked sooner, maybe even speak with the schools and local groups, Bute wheelers would also be a good starting place
Don’t need this !
Not needed in my opinion
We don't need a cycle lane,
Utterly  useless 
I’m gobsmacked that anyone with an ounce of common sense could dream up this ridiculous idea
Not needed ar all, waste of money/ time 
Waste of money 
Needs of the community,  come here and look for yourself,  the last thing we need is thousands spent on a bike lane
There is a pavement/ promenade....cyclist's will still use the road due to their sense of entitlement 
Not fir disability
It will be a pain for drivers
This can be easily improved if time is spent on bute to see practicalities of concept.
Absolutely no one is backing this 
Sea wall falling to bits and roads in pavements are in shocking condition 
No. Firstly, if someone wants to knock over a cyclist, they’re going to knock over a cyclist, “safer” routes isn’t going to help that. Secondly, those pavements
are of historical significance, just look at the Rothesay in days gone by Facebook, everyone’s granny has a photo walking along that pavement. Plus, everyone
hates cyclists, that’s only going to get worse if you destroy the natural beauty of the town with a cycle lane
They did the whole cycle thing in Greenock and wasted millions of tax payers pounds. This is a terrible, terrible idea. This would be Rothesay’s breast feeding
mermaid gable end, don’t do it. Nobody even cycles on the island.. Look at The Real Isle of Bute Facebook Page, you’re not doing this for the people of the
island, they don’t want this. Building a cycle lane isn’t going to get rid of the eyesore rotting academy on the hill or the catastrophic let down that is the
pavilion renovation - finish that before you build cycle lanes. 
Total waste of money. The town needs regeneration, not a bloody cycle path!
We have a promenade that runs from the town to the Pavilion. This is wide enough to accommodate all.
It will NOT meet the needs of ALL the community. It will be divisive, causing frustration towards cyclists and traffic issues
The route and proposed plans are not well enough thought out
No communication with residents and the whole scheme is being pushed through with no care for what the residents want or need.
The whole scheme will cause disruption and delays to motorists due to restricted width of the roads in places where changes want to be made.
Total waste of resources 
Very concerned 
Access to pier for ferry traffic
Page 207

Page 208

105 | P a g e
www.connectedtp.com 
Already plenty of opportunities around the island 
Narrowing the pavements for un-needed cycle paths disrupts walkers, parents with prams and strollers, and wheelchair users.
Putting in cycle paths on the pavement areas will mean an extra set of kerbs for folk to trip on.
The community doesn't need this change because there is no need for it - the pavements, the promenade, the pathways are all perfectly fine.  The idea of
reducing the size of the roundabout is absurd - how are the buses to negotiate it?  the idea of reducing the taxi parking is inhumane - the taxis are essential
for people who have no cars.  Public transport doesn't cover the whole island, and elderly or disabled people coming back from medical appointments rely on
having plenty of taxis available.  They are also needed for the many visitors who come to Bute.
There is no need to change anything - there is plenty of room for walkers, cyclists, wheelers, and anyone with mobility problems already.
Misplaced plans to fix something that does not require to be fixed whilst simultaneously creating problems that didn’t previously exist and compounding those
that did.  That's an emphatic 'No' from me!
Misplaced plans to fix something that does not require to be fixed whilst simultaneously creating problems that didn’t previously exist and compounding those
that did.  That's an emphatic 'No' from me!
Lack of parking due to the cycling layout 
Need to revise the placement of the cycling lane. All the space on the promenade which is empty and not used.
I regularly walk the route from the Gleburn to town. There are three separate paths which can be used and they are more than adequate. There are a number
of dangerous flagstones and potholes in town, the money would be better spent repairing these and employing a dog warden to address the issue of dog
fouling in this area! 
There was very little information or publicity about the initial phase of this plan, I don't feel the community has been adequately consulted or listened to
regarding this. 
Good, but could be enhanced.
In general yes.
pointless exercise
do not proceed with this
I think the design is totally inappropriate for the needs of the community of Bute 
Very concerned. I can categorically say that at least 90% of the population of Bute are totally against this ridiculous proposal. 
Not really, it can all be done already, it is a small community
Due to the fact that there  ar  2  pavemented areas from albert pier to the  glenburn ( one of which is a wide pavement)   and already problems with parking
on this road, this would be  insane.
For the route from albert pier there is again broaded pavements and the prominade,  so  again no need for this. I do not believe this is a  good way to spend
public money.
Not needed, waste of money
A 2 way cycle lane on one side of the roafd will create dangers for people like my sons who have learning disabilities. It will not stop cyclists cycling 3 abreast
on lane and road. It will cause chaos for pier traffic, it will narrow the road , it prevents parking for residents. With the Highway Code hierarchy of road users
this is not needed. Especially at a cost of 6 million.. 6 million !.. has the government this amount of money to spend!!           
The community does not want this wast of money and badly designed cycle path
Page 208

Page 209

106 | P a g e
www.connectedtp.com 
There is no issues in regard to cycling in these areas and as stated multiple times above it is a waste and does not benefit the community in anyway
No it is an unnecessary waste of money which could be used to improve and fix the places we on the island already have available to cycle on ie the widest
pavements ever the prom and the coastal path along battery place  
We do not need cycld paths
It’s pointless
Pointless
Nonsensical concept
Waste of time and money
Apart from not being wanted or needed, this will be an absolute nightmare getting onto the ferry lanes, especially at busy times.
If you were really interested in the needs of the community you would scrap the whole idea!
The town would be losing much needed parking. Battery place is made up of flats and many b&bs, where do you propose residents nevermind visitors park?
The taxi rank proposed isn't ample for what the island requires, where will they go? The ferry que is asking for trouble during peak times. Another point of
where will the overflow go and wait?
Unnecessary 
The demographics of the island are changing and over 55% of islanders are over 55years of age .  Not the group who would take up cycling radio. The cycle
route connects nothing in town for folk to commute too. The driving standards on the island are terrible so adding to the 
Absolutely ridiculous idea
Extremely concerned
Waste of money 
Car congestion
Pointless waste of funds
There are far more important issues that need addressing 
Not needed !! Waste of money 
We don’t need this ! Waste of money . 
Absolutely not,  this is not taking pedestrians and families into consideration at all - does this mean cyclists have the right of way when people are attempting
to cross? Vehicles going to and from the ferry? 
It’s quite frankly a lot of rubbish - build something people actually want! 
Extremely concerned. It's as if it's been designed with no forethought whatsoever to community. Which is shocking & disrespectful.
No as previously stated there are already areas that can be utilised for these activities. 
A total waste of public money. The sooner this hare brained scheme is consigned to the rubbish bin, the more money will be saved by not paying over priced
consultant fees.
Therr is alot more needing money spent on than investiing in thist
As a frequent cyclist and walker I see no benefit in this concept
We do not need this we should spend the money on something useful 
Don’t do this 
Page 209

Page 210

107 | P a g e
www.connectedtp.com 
Worst idea waste of money resources and more. 
The whole thing is unnecessary
As above
Why does it require 6 bodies ,who all will be taking their  "cut "  Our council tax can be better used. My vote is a big NO 
Existing system already works for us
New system not required in Rothesay
No.
The design does not meet the needs of the community in any positive way.
Designed by someone who does not know Rothesay 
Where is Victoria Road?
I don’t consider cycling and walking paths should be the same pathway. 
It is not aligned with the needs of the community. 
Hugely disappointed that this has been given any time of the day stop the pen pushers making decisions for a community just ask them and deal with the
answer instead of this farce we are going through 
This plan is terrible non local think he knows best ridicules 
I'm concerned that taxpayers money is not being better used.
See comments above
The Promenade along Battery Place already caters for walking, wheeling, cycling and future mobility
This is another hardship foisted on Rothesay residents by Argyll & Bute Council which says it's open to feedback and then simply ignores residents' comments
and imposes Council's will regardless. On any given day and night there are around 20-25 vehicles parked on the pavement  along East Princes Street and
Battery Place. There is nowhere else for residents to park their vehicles. Residents along these roads were hoping that the current tolerated parking on the
pavement opposite would be formally permitted to counter the blanket ban on pavement parking enacted.  Simply because funds are available for a project
does not mean it should go ahead. This proposed change to create cycling lanes will pit resident against resident for the limited remaining parking. Rothesay
guest houses (already) dwindling as a result of recent prohibitive changes will continue to throw in the towel and simply quit running guest accommodation.
Not needed 
Use the prom
Needs of the community are overshadowed by need to push through new but long term unsustainable ideas.
Will merely increase hostility to the few cyclists who might use it.
It's a waste of money 
They are no better than what is already in place 
As above. would need to get the full detail specs to fully support it. Maybe if funding limits ability to hit all details require for safe spaces, it would be better to
forget bicycle lane and focus on creating a slower, better designed street through surfacing and planting. Cycling was my main mode of transport growing up
here and living in Glasgow for uni, I am passionate about urban design and active travel, my dissertation was a critical analysis of bicycle infrastructure in
Glasgow so i am familiar with many designs both good and bad. I think good street design really cracks into the subtle psychological cues to reduce driver
Page 210

Page 211

108 | P a g e
www.connectedtp.com 
priority and a powerful tool within that can be ambiguity! Overall something absolutely needs done about the towns streetscape and am fully supportive of
proposals to make changes. Please don't let those who shout the loudest dissuade plans to make changes. 
Yes but the devil is in the detail with street design
Do not take into account local knowledge and concerns.
Worried local feedback is ignored as ‘free money’ available. Get grants to get Hanson to do something with Royal Hotel eyesore before pandering to nonsense.
Please
A waste of money , would be better making a completely off road cycle path adjacent to the tramway path. The roads in Bute are too narrow for any more
space to be taken by extra lanes 
I think it will make it worse , there will be more accidents with people crossing the lanes, if there is a reduction in parking then this is not inclusive for disabled
people , it will impact on local businesses if there is a reduction in parking so people can get into town.
I don’t believe it’s needed
I don’t believe it’s required 
Waste of money. Money could be spent better in the town . It’s not ideal either for those with mobility issues 
Not pleased at all. I think its a pointless idea.
We haven't got a problem for  cycling or walking in Rothesay so why change it?
Just don’t see the need for change
Not necessary. Promenades are quite adequate as they are. This could cause difficulties for cars turning onto the pier 
Im totally against this happening 
The upheaval this would cause to the town would be ridiculous LEAVE IT ALONE 
Taking the majority of space for cyclists from Albert Pier to the Glenburn and just leaving the narrow path on the seaward side for pedestrians who walk with
dogs, prams, children etc is disproportionate and not necessary 
This appears not to have taken any account of the local community or their wishes. 
The design doesn't meet the needs of the community. Many more things need doing before this unnecessary design. 
The pavements and roads are already adequate 
Too much space used for cycling 
Plenty walking facilities on island  and safer than the bottle neck that is going to happen in the  town centre     
Waste of time and money 
The busiest street in town will be the most dangerous 
The majority of the local community don’t want this 
As mentioned before I don’t think this path is needed on the chosen route. I think the route that should be considered is to the school as it would benefit the
kids (and parents/teachers) and give us a safe path to cycle. 
I don’t think the route chosen needs a dedicated cycle path as there is already a safe and adequate path in place. 
Terrible 
seems like a money making scheme for a few people. pointless project 
Think money could be spent on more urgent improvements such as roads/pavements and seawall  
Page 211

Page 212

109 | P a g e
www.connectedtp.com 
The person in charge MR rinkus just isn’t listening to my locals and very arrogant   
1%of the population is pretty poor engagement in my view 
I dont think this is a particularly useful or cost effective way to improve either walking or cycling in this particular section of town. Pavements here are mostly
already quite wide and conducive to walking. There is alrrady a walki g route on the promenade. Waste of money that could be spent usefully elsewhere. 
Not interested as this island is determined to be run to the ground 
Pavement parking at busy times in the Albert Pier to Glenburn section works well and costs nothing.  Why spend public money to change it? 
This is a sledgehammer to crack a very small nut.  Walking and cycling on this section of the A844 is no more dangerous than on other roads in the town. 
Adding a pedestrian light to the traffic lights would be sensible, and perhaps a pedestrian crossing by the Visitor Centre, but apart from this the whole project
is an unnecessary waste of public money. 
Existing measure only need improved 
Imposing on limited parking, existing taxi rank, roundabouts, entrance/exit ferry terminal 
Very happy with the idea. How does it relate/join to the active travel route up the High Street to the school? 
The community does not need nor want this. 
There is sufficient pavement space for walkers and wheelers in the proposed location. Cyclists can continue to cycle on the road like they already do with no
issue 
Not needed 
Waste of money, not needed 
I'm pleased about this project as a start but I'd prefer if the route was more connected eg. to Mount Stuart, which have extremely dangerous and innacessible
route for cycling and pedestrians especially out of season when gate at Kerrycroy is closed 
Many Bute residents are in capable of cycling or walking 
This design is seeking to address a central target as opposed to a local issue. I would rather the money was spent elsewhere. The more 
Absolutely not. 
The community neither needs nor wants this 
I cycle every day on the island and usually in Rothesay. There is absolutely no need for any change from what we have. There are many cyclists here and the
vehicle traffic on the roads is used to them and patient with them. I have always felt safe cycling here and this would be a total waste of money. It would not
be used and would probably just annoy everyone. I would rather the potholes were fixed so I don't need to swerve to avoid them. 
This is a virtual signalling exercise , nothing more 
The promenade has ample space to create cycle lanes 
This is going to create a lot of problems at the peir 
It’s ridiculous 
Waste of money 
Not in the slightest 
There is absolutely no need for this 
Pointless interference 
Spend the money on fixing potholes.
Page 212

Page 213

110 | P a g e
www.connectedtp.com 
No consideration for the local community. One size does not fit all. 
Lack of interaction with the community 
Absolute waste of time, resource and money. As a keen cyclist, pedestrian and motorist I see absolutely no benefit whatsoever from this project. 
Fix the existing walkways 
Just causes more upheaval for little gain & a minority of people 
The community didn't ask for it because it doesn't need it.  The route is nonsensical. The money should be given to a town that would be improved by a cycle
path. 
This is a really badly designed survey. 
Stop interfering with things that don’t need fixed 
This idea is a load of nonsense 
I object to the plans. This is a waste of time and money and upheaval and no benefit to the community or visitors. Why put a cycle path in a place where one
isn't needed? The cycle changes could be made to improve access up High Street to the Academy. 
Improve the surface of the promenade and the Albert Pier area 
The path simply will be underused 
The whole project is pointless, unnecessary & a waste of money. 
Its a waste of communuty money when the park is a mess with the grass cutting being no lifted, theres no football goals, skateparks, the the kids parks needs
a facelift. The prom wall is falling down, theres weeds growing everywhere. Understaffing the council in alot of departments. The roads are a mess and full of
pot holes and lets not start on the pavillion and whats happened there. 
There is not enough cycling on rothesay to justify this 
Not needed fix all the other roads and pavement s 
Waste of money 
Taking over a large part of the pavement is not appropriate - are people meant to walk in single file along the pavement so they do no disturb the cyclists? 
Very concerned as it appears that no negative comments are being put forward on the other page. 
No, there is no barrier between cycle path and pavement - dangerous for pedestrians, narrowing the pavement also a hazard as is introducing floating bus
stops.  This plan will limit the number of people wanting to walk in the town and will reduce customers to local shops as they may decide to walk along
esplanade instead. 
Not heard any voices in support of this plan 
Not needed 
As per above 
Unless I am mistaken? The plan is for people to cross a cycle path to get on a bus? Not acceptable 
This is a terrible idea and a total waste of money 
I think the design is aligned to the needs of the community, but the benefits to pedestrians and wheeled transport users could be emphasised more. At the
moment, car owners seem to be directing their frustrations at cyclists, which seems to be missing the point... 
Not needed 
There are plenty of of walking pavements already 
Page 213

Page 214

111 | P a g e
www.connectedtp.com 
Leave as is and spend the money allocated in a more beneficial way. 
The volume of traffic particularly in the summer months needs more car parks. 
No need for a cycling line at all, for people walk pass battery Place there is enough space and safe areas. Cyclists also have enough space to pass on the
normal road. 
We do not needed, by only think about the cyclist, the project would hurt all accommodation business along battery Place.  Alos will make problems to
residents to park up their own cars. It is unnecessary project for Rothesay 
The project is not a bonus to the island at all 
This area already has a very good pedestrian access 
Community don’t want or need this 
Don’t want or need this 
The plan does not allow connectivity within town now does it take into account actual needs of community - this is an aging community so mobility scooters
are an issue 
The route does not connect anything that is useful for those that live on the island (wet and windy one). The connectivity is needed up the high street to the
doctors, the hospital the sports center the cheese factory and school. 
Existing pavements require to be resurfaced and left as they are. 
I’m concerned that nobody will pay attention to what the majority want and that is to CANCEL THIS IDEA. 
The funds should be used to reinstate the pavements at the broken sea walls along Ardbeg Road, this would improve the walking experience for everyone. 
This would make walking into town worse as the pavement would be narrower. I don’t like walking along the prom! 
Don’t want or need it 
Don’t need it. I walk a lot I this area and don’t think it’s necessary 
No need to spend valuable resources on this. 
Do we really want to spend money on this? 
I think it is the wrong project for a town in decline 
All ready adequate for all of the above 
Waste of money the community does not need this money could be better spent elsewhere 
if it works then great.   the parking and traffic flow needs sorting 
This really isn't a priority for the needs of the community. 
Please spent your money on something that is needed and benefit the residents 
The pavements are wide, mobility users cyclis twalkers all get along. This is not a big computer city town etc where it might benefit 
How on earth can this be justified when improvements are. Ended toTidy 
I do not believe a cycle track is needed through town, it goes nowhere, useful, and at the end of it cyclists will have to return to the road. It does not appear
at all to be aligned with the needs of the community. 
The design will not improve the experience for walkers and will create safety issues.The design will not improve the experience for walkers and will create
safety issues. There is nothing in this design that will persuade people out of their cars.
Page 214

Page 215

112 | P a g e
www.connectedtp.com 
I don't have faith that this scheme brings any benefit to the community. In fact I think it will actively harm pedestrians that will be expected to use poorly
thought through floating bus stops. 
A good idea, but I would rate as a higher priority the dereliction of Albert Pier and the old Royal Hotel and the dilapidation of some of the seafront buildings.
These badly need the speedy attention of ABC. 
This is a crazy idea 
Very concerned, dangerous and stupid idea 
More pressing issues 
Not listening 
It will cause problems for cars entering the ferry terminal and lanes. People will not be able to walk safely in this area due to less pavement. 
You cannot walk and cycle in the same lane. People with poor mobility, wheelchair users and prams users would not be able to get out of the way of cyclists. 
Feel like the community are being totally ignored 
Not needed 
Only considers cyclists 
I believe some aspects of the design are damgerous to the public. 
Not pleased as it isn't aligned with the needs of the community 
It really is not required. 
Not required as there are parallel paths.  
It is all very well saying it is ringfenced for such purposes - fine, spend it somewhere where it will be of benefit, don't waste it here. 
I truly do not think there is any problem with existing pedestrian, cycling or motor traffic through the town 
Rothesay does not need a cycle lane. Traffic is light and there's ample room on the prom for kids to ride their bikes safely. 
No actual feedback from people who use this daily. The reduction in car parking will harm the town as it’s already a struggle at times - especially busy periods
for those waiting to get into the ferry queue when it’s full. Narrowing the road here makes no sense whatsoever. Reduction in parking for taxi’s also ridiculous
- four spaces are not enough for them. 
Plenty of walking opportunities currently. Plenty of cyclists use the area with no complaints other than the roads need resurfaced in places. There are better
ways this could be done and the lack of understanding by those delivering these meetings is unbelievable. It’s been done with no community interest. 
No cycle path required in town 
No cycle path required in town 
whole project is not required on Bute 
you are over engineering a problem that doesnt exist and I will be monitoring if the community oppositions are noted in this ‘survey’ response 
It will actually cause more harm when visitors are trying to leave the island, the pier is also destined to cause accidents 
This has absolutely no place on Bute as we have an adequate promenade for this already 
Very concerned. The scheme appears to have ignored public opinion from the stage 1 consultation, and the proposed design is out of touch with local views.
The design does not offer any value for money and completely ignores far more practical, and less damaging options to create the scheme which are permitted
under the design guidance. 
Cycle lane not required
Page 215

Page 216

113 | P a g e
www.connectedtp.com 
No requirement for cycle lane 
The community have very loudly said that they neither need nor want this project 
There is plenty of room at present for walkers and cyclists to move between the Pavilion and the Glenburn areas. 
The community have made it quite clear that the proposal is not needed and that there are far more pressing areas in need of funding. 
In an ideal world fine. We’re not in an ideal world, so put the money to better road and traffic management use. 
In my local experience, Bute cyclists will continue to cycle where they want to. 
Unnecessary. 
I don't recall a local petition requesting this, but I do see a lot of opposition to it 
The consultation exercise appears to be biased in favour of going ahead with it, regardless of local opinion 
No-one asked for it and very few want it 
Overkill. No thought has been given to residents needs 
a much needed investment and well considered project.  Well done in trying. 
I think part of the difficulty with any proposal for change in Rothesay is the lack of community feeling. 
Pedestrians and cyclists, but particularly pedestrians and those with mobility needs, are poorly served by the current provision of pedestrian crossings. The
lack of pedestrain crossings and the lack of control on traffic speeds means that people have to cross roads at dangerous locations. 
As with a lot of these schemes, whilst trying to improve provision for walking/cycling there is an adverse effect on the day to day routines of local residents.
Putting pedestrians and cyclists side by side does not make for a safer environment in this instance. Given the nature of the area around the discovery centre/
putting greens a lot of people will find themselves crossing the cycle path rather than walking along it and therefore increasing the likely hood of a serious
accident between pedestrian and bike. Moving the cycle route along the seafront where there is far more room would minimise this risk. 
I only found out about this by accident, I don't do Facebook etc so I fear many people have missed out on the opportunity to participate in the consultation
hence the low turnout so far. 
I think it's very hard from the provided material to get a good grasp of what outside the largest features are. I 
You receive a negative response on the required question because I'm required to provide on 
Put these lanes in a bigger town 
Sort the roads and pavements out first please 
as a cyclist i have no safety concerns for present cyclists on the road. I would not use this proposed cycle path. 
to focused on bikes. 
Why would anyone use it? it's too short and goes no where. maybe a better idea would be to use the funding to create a safe path up to the school. Walkers
will be vulernable to being hit by a cyclists and dog walkers too are at risk. 
Better using funds for potholes 
All residents and visitors need access to shop, amenities and services in rothesay. Some need it to park on the front street and infact their homes and
residentsies 
Improvement is not needed in this town 
Page 216

Page 217

114 | P a g e
www.connectedtp.com 
What changes would you prefer the design to include more of?
More crossings to benefit wheelchair users
All looks great
Pedestrian access, parking bays
The marking of parking spaces, as normally people don't park correctly taking up too much space 
Pedestrian crossings, Parking bays
increase taxi spaces, make some kids park or something on the green
more space for the taxes
maybe more things for people and tourists to do, maybe adding better and bigger parks and dog parks and maybe more to do i have no more ideas but
1) Narrowing of the road will consequently reduce speed of the cars, I see this as an additional gain of the project. 2) Pedestrian Crossing is low more will
boost use.
more taxi spaces
hn
kjjjjjjjkjhijh
clarity on crossing priority
crossing at the roundabout from Honeyz cafe side to the Fyne Homes side. Some sort of junction to make it easier to then go up towards the High Street.
Lights which allow bikes to go first at junctions
cycle rute to the school ,more nature , .
Spend the money on more important things 
Not needed!
Not needed 
Not applicable 
It’s not needed
No cycle lane on the pavement or over the pier to Albert pier. Just use the promenade it's been used as a cycle root for years and is perfect.
Not happen at all! 
More road less cycle lane
There is no need for this scheme 
The drawbacks far far outweigh the positives
Parking along battery place
Nothing, waste of money and resources. 
Space for existing road users.
No cycle paths 
None, whole thing is an unnecessary waste of money and will make life worse for most.
Not needed 
Page 217

Page 218

115 | P a g e
www.connectedtp.com 
Do not go aheaf
Cancel the proposal
Nothiing
To stop wasting taxpayers money on non useful plans such as these.
Car Parking 
We don't need this
Don’t need cycle path
Cancel
Things for children to do 
Spaces needed for taxis, there’s normally 8 operational during the day.
Not needed
Nothing. Ridiculous idea. 
It is not required on our island.
Cognisance of areas without already well defined routes 
Stop it completely
Sc the design
Absolutely no need for it at all. Waste of money!!! Spend money on I.proving pavements pedestrian crossings and drop kerbs
None, total waste of taxpayers money
Waste of money that could be spent elsewhere
There should be no need for change as it should not be built.  
Bin the whole design 
I do not endorse this design at all
Nothing. This is ludicrous 
Less cycle space
Implementation of bute community and residents concerns
Safe crossings
I would prefer the town left as it is
Not too happen 
20mph limited
Do not go ahead with the design 
It is not required, scrap the whole idea.
Create more parking as a bus stop should not be beside a roundabout
We don't need a cycle lane
Scrap the whole plan, spend the money fixing potholes instead
Page 218

Page 219

116 | P a g e
www.connectedtp.com 
Scrapping the design
An alternative cycle path in another area.
None, it is totally ludicrous to suggest that any intervention is needed to the current layout 
Don’t want the route to happen at all.  Complete waste of money.  A lot more important things needing done for the community first
I think it is a waste if taxpayers’ money
Not needed ,
No changes. Whole thing is a joke 
I think it is a preposterous decision to put that into place on a small island
Not
Stupid idea
No need for cycle path
Use of areas already accessible to bikes
Waste of money
Disabled parking
The wide pavement from the Albert pier to be made into car parking bays.
Cancel. waste of money.
None. It’s a lot of shite that’s not wanted. 
Prioritising pedestrians. Not safe to have crossings next to hatched yellow areas near the ferry terminal as traffic often waits on the hatched areas.
Use the prom as a cycle route 
Anandoned
Controlled car spaces
The money would be better spent improving the roads for cyclists. I’ve buckled 2 tyres on the potholes recently!
Funds to keep the gardens along the prom in a good condition as it used to be
Scrap it
Scrap the whole idea
Think it should be scrapped waste of money
Move the cycle lane to the prom
Leave pavements and roads as they are 
Better parking
Pavements are for peoplem not bikes.
Cancelled waste of money
No cycle lane required
Parking
Routes for families / children ie to schools 
Page 219

Page 220

117 | P a g e
www.connectedtp.com 
Keeping children safe first at the schools
Car parking 
Parking
Absolutely none of what you are proposing! We don't need any changes in this area!
Leave it as is
Don’t think it is necessary for our island
Status quo
Nil
Parking
More car parking for short term stops
No change
Better existing path surface
Consideration of safe parking spaces for cars
Money going to other local projects and repairs to existing buildings and the promenade. No need for money being wasted on cycle lanes. The pavements are
adequate and the traffic are courteous of cyclists not to require a lane. 
Parking
N/A
None,I'd prefer the proposed design to be rejected.
Sack mark rinkus 
Parking for cars 
I don’t see what benefits to the community will be released through this scheme 
Parking 
Drop the design completely as a waste of public money 
Improved parking around town in particular for residents of areas of flats
Abandon this ridiculous idea which will only make things more difficult for the town and for the elderly inhabitants
It's not needed
Don’t need it , total waste I money 
Scrapped all together ad other things need attention first 
Scrap it 
Enforce parking restrictions round Albert Pier
Leave as it is
not needed
No to introduce e it at all as not necessary and redirect the funds somewhere more needed e.g fixing the broken storm wall in Ardbeg.
Not to happen
Page 220

Page 221

118 | P a g e
www.connectedtp.com 
More relevance to the community’s needs.
Need A Decent Car Park Not A Cycle Path
Rothesay needs a car park not a cycle route 
Call the roads their correct name in order that survey may be completed correctly, there is no victoria road on the Island!!
To not happen at all
Not needed
Cancellation 
None – it’s a waste of money.
Better signage, ie road markings, NO vehicles parked on the pavements. 
Nothing, I don't want it
A resolution to an actual problem. Middle of the busy season or any other season for that matter is there any difficulty walking or cycling from the Glenburn to
Rothesay? None I have ever seen. So what exactly is the problem being resolved here? The resolution of a non problem is clearly causing many actual
problems for real residents and holidaymakers. Many roads have one pavement. Battery place has 3 and one of them is wide enough to fit a bus and still have
space to walk and cycle on but somehow Battery place needs more space for walking and cycling. Have the designers been to Battery Place? 
Not required
It's not needed at all
Spend the money repairing the sea wall
Scrap it
Money spent on an area for kids
The design is not required, just because money is available to do something does not mean you have to do it. 
We don’t need it 
Leave route as it is,no cycle or walking lanes as not needed
Scrap this nonsense
Cancel it 
Scrap the idea
The promenade can be used for walking and cycling and the pavements are perfectly suitable for walking
More consideration of busy traffic route - you shouldn’t narrow it
Spaces to sit
Unnecessary
There is already a perfectly good pathway between both sites already
No changes needed here
No change at all
None
Nothing
Page 221

Page 222

119 | P a g e
www.connectedtp.com 
Cancel the plan
Parking
To use the existing paths that are already there. The prom, the wide pavements. Absolutely no need for this. 
I wouldnt because it is not needed
Don't do it
None, leave as is
Left as it is
Repair properly the damage done by the ?Nov 2022 storms to the Ardbeg Road pavement & railings, and infrastructure. 
Just leave it the way it is 
Taxi spaces for visitors, 4 is nowhere near enough. 
Spend money more wisely 
Don’t know
Not required at all 
I think there are better ways to spend money on the Island. 
There is no need for this so scrap the whole design
Scrap the idea! Many more needed improvements should take precedence!! 
it's not needed 
Parking
None of it- washing money ABC just like you have on the pavilion. How about reducing prices for the Bute Highland Games in OUR PUBLIC park.
Change to be no route. It’s not needed. 
No renovations. Cycling lanes are NOT needed. A taxi rank is.
Not to go ahead 
Scrap said Proposals altogether. Waste of money 
Fix the pier 
Cancel the plans
Scrap this plan, not needed
Fixing the currently pavement 
I think this is a terrible idea I would spend money on better free parking
We don’t need this! STOP this ridiculous proposal! 
Scrap it
Forget the idea 
We don't want it
Not needed
Wider cycle routes
Page 222

Page 223

120 | P a g e
www.connectedtp.com 
Complete segregation of bicycles from pedestrians. If you can’t do that, scrap the idea and put cyclists back on road 
It isn't clear in the drawing how access and mobility will be improved for disabled people and wheelchair users
Not to waste money on doing it in the first place
Cycle route not needed 
Scrap the plan. It's clear that nobody wants it. You're looking at these results right now trying to figure out how to spin it into a positive (I've been there), but
this is a glaringly obviously loss.
Scrap it 
Bin it 
Not bother leave everything as is currently make no changes
Scrap it and use the funds else where
Print on soft paper to wipe my derriere
Route is not suitable going through the town, use the promo along the sea wall as this is understandable used. 
Plans to scrap the idea 
It should be abandoned 
Please spend this money on maintaining existing paths, roads and railing
Total waste of money
Spend the budget for this more wisely.
Don't happen 
More of leaving this area as is 
I don’t want the cycle track
Keep road current width in order to get past delivery vehicles 
No changes
Not needed
The project is not necessary and money could be better spent elsewhere. 
Improved road conditions for pot holes and surface of the road
Don't do it to begin with 
Don't start it
No need for it, do not waste any more money 
Scrapped
More parking
Not needed 
Not needed
Nothing
Just repair existing roads and pavements 
Page 223

Page 224

121 | P a g e
www.connectedtp.com 
None
The layout there is sufficient space along the sea front
Scrap the plan as designed
None ludicrous idea
Money spent on more pressing matters 
Fix the pavements on both sides of Victoria Street
Leave it as it is.
It's not needed. 
VICTORIA STREET not road
No need for a cycle lane
Scrap this ridiculous idea. Not needed or wanted.
This is not necessary there is plenty of space for cycling and walking. Focus on more important issues 
No cycle lane
None, it shouldn’t happen
It not to happen 
No design no projects 
Don’t do it
Don’t do it
None 
Just don’t do it
Do not think it is needed 
NA
More parking 
None. I see absolutely no benefit in this scheme
Update the promenade for walking and cycling.keep pedestrians away from cars. As little development as possible.
This is not needed on our island
It should not happen at all
Spend the money elsewhere it is not needed 
None
Don’t feel this is required traffic isn’t such an issue on Bute
Cancel 
Scrap the idea
Walking space needs to be priority over cycling. More people walk this route and squeezing the walking space down to 1.5 is not a good idea 
Do not believe it is needed 
Page 224

Page 225

122 | P a g e
www.connectedtp.com 
Repairs to existing pavements
Not required 
Free parking 
As opposed to architecturally changing Bute perhaps a wee bit of paint along the super wide pavements to create a non invasive cycle path might be more cost
effective
None
No changes to layout 
Not to waste money
Move it to the prom
Parking
Fix the potholes on the roads
Nothing 
1. Why do you need to place it there. It’s a ridiculous location. There is the seafront to cycle along. 
Parking.
Not needed 
No cycle lane  wate of money 
Scrap the project 
Keep existing 
Greater use of existing infrastructure, to reduce costs and provide more impact .
Scrap the idea, won’t work & cause congestion 
Abandone what is clearly a pointless waste of taxpayer's money that has ZERO local support.
Use the esplanade for overflow pier traffic and extra parking if required 
Could do other things on bute
None
Common sense  
Pavements levelled out for better wheelchair acces.
Planning
Parking spaces in town centre
N/A
None we do not need it
Expand to the whole island
Nothing wrong with what we have
More thought for what the people of the island actually want
Road 
Page 225

Page 226

123 | P a g e
www.connectedtp.com 
Not required 
None, Great Plan
From the marina to Glenburn Road, the shore pathway is in need of resurfacing and repair
Scrap the whole ridiculous project and spend the money on something useful. 
More parking
Existing infrastructure is good
Reduction cycling/walking lanes 
We don't need this
Cancellation 
None of the above. The path towards port Bannatyne or Ardbeg seawall would be more useful
Improved safety for cyclists using the road - for some reason drivers have a problem giving way to cyclists on those two roundabouts.  A lot of cyclists are
heading into the town so still need to use the roads.
More money spent on repair of Albert Quay
Coach parking
Spend money on something the town ny
More parking along Battery Place
Look to increase car parking spaces as much as possible on Albert pier
Total waste of money to impose this nonsense on a rural island community 
Good surface for walking and cycling 
None
N/A
More parking for cars ..
Keep pavement as it is perfectly ok.
To extend it up to Ardbeg or Port bannatyne. 
None
Don't need a cycle path.  There is the promenade to cycle if unsure on road for this stretch
Cancel the whole thing.
just drop some pavements 
Money spent elsewhere
Don't think we need one
More Car Parking Spaces
I would prefer this not to be spent in this but on routes to the school
Scrap it
No cycle tracks
Page 226

Page 227

124 | P a g e
www.connectedtp.com 
In different areas such as port bannatyne
Where is money coming from 
Not needed
More parking for cars 
A longer length, e.g to 'the fountain' aka Prospect House
Pier is too rich for turning now especially with Commercial vehicles 
We do not need a cycle path there we can use the promenade
Scrap the plan for cycle lane
Parking on Battery Place pavement 
Cars
Scrap it completely
It isn’t needed at all, this question is rigges
More parking for residents
Nothing, money should be used on other things in the town.
We don't need a cycle lane 
Not to happen at all. As it will take away valued pavement for eg walking, wheelchair users and prams
No changes. The idea is useless and will cause more risk of bike accidents 
This cycle path is not wanted and not needed
Most important no 1
This is not needed, and is a waste of money. The promenade and pavements are already wide enough for walking, push chairs, wheel chairs etc. We don’t
have a major problem with space for cyclists - our roads are not hugely busy. 
Cancel the idea
I would scrap it 
Pedestrian crossings
Wouldn’t have it at all. Waste of finances when plenty of open space to cycle a long prom already. 
Not required at all
For the idea to be scrapped but instead for the money to be used to fix the prom as this is where people regularly walk and cycle anyway  
N/A
The design should be scrapped.
Scrap it and where exactly is Victoria Road on Bute ?
Use promenade 
Use existing wide walkways at shore side
Common sense
Not to happen
Page 227

Page 228

125 | P a g e
www.connectedtp.com 
Repair of existing pavements/pathways
Increased and improved parking facilities within the town centre
More design with trees and some style, bike parking, markers with every kilometre/ mile
Pavements should be for pedestrians only. There is already plenty of paths in existence. Cyclists have no issue using existing roads. I would be too frightened
of using a path shared with cyclists.This is a waste of money and will cause a huge headache for residents.
Don't want it
Where possible use existing sea path, just do a cycle lane, it’s wide enough and put signs 
Stop forcing active travel on unwilling voters
Extend to full blown cycle lanes on island 
More taxi parking places perhaps
Nothing money would be well spent on other things
More parking
More parking
It's a waste of resources money could be spent on other pressing matters 
No changes just scrap the idea
Cancel the project 
This area is already wide for bicycles so not needed in this area.  Ardbeg to Rhubodach would be far a more useful route to change.  The ferry entrance on this
design will NOT work with cars, trailers, HGV’s trying to navigate a very sharp narrow turn
As a regular cyclist, I say scrap it, not needed or wanted
Not needed
Fix pot holes
More spaces for taxis as I’m a taxi driver and we have 11 taxis on the island and not just the 4  you’re making space for  
Repair Ardbeg Road. 
Speed control measures especially from roundabout out towards Battery Place 
None 
Scrap it.
No benefit to anyone 
The route is wrong, this area isn’t an issue for cyclists, roads are wide enough for people to overtake
We don’t need this . Period .
Funding go to other community needs
Car parking
None
I would prefer it to be scrapped altogether 
More parking 
Page 228

Page 229

126 | P a g e
www.connectedtp.com 
Don't bother, redirect the money where it's needed
Don’t do it at all not needed
Should be cancelled
N/A
Stop it 
Parking for cars
Short term parking. Taxi and coach parking ( more users per vehicle). People with additional needs.
It shouldn't go ahead 
None 
Not being there
Cancel it completely 
More consideration for ALL locals and tourists
No alterations to road layout
Scrap it
Stop wasting money on a useless idea 
Don't do it 
Design is not the issue. We have a prom why not utilise that? 
Would prefer it not to go ahead
These roads are already safe for cycling 
I would prefer the design to leave Bute and take itself to where it is needed, like some dangerous roads in Sandbank for instance.
SCRAP THE PLAN.Misplaced plans to fix something that does not require to be fixed whilst simultaneously creating problems that didn’t previously exist and
compounding those that did.  That's an emphatic 'No' from me!
Car parking availability 
Not to spend the money on a cycle route that isn't needed.
More pedestrian crossing points.
common sense
Leave as it is pavement could do with a repair in places 
do not proceed with this
I would prefer the existing roads along the shoreline of proposed ludicrous development to be properly repaired
Parking spaces
I don't want 20 min neighbourhood 
No bike lane 
Use  of the promenade  
Waste of money
Page 229

Page 230

127 | P a g e
www.connectedtp.com 
We don,t need any changes to the walkway from pavilion to Albert pier
Scrap it
Actually listening to the community and locals who do not feel this is necessary 
Vehicle parking 
More ambitious. A cycle path is required along the flat from Port Bannatyne to Kerrycoy. The roads are not safe for cyclists.
Cycle route not needed
Sensible removal of concept
1 We do not need it!
Remove the cycle lanes, they're unnecessary 
To make more use of the under utilised space on the Promenade  
Total waste of money
Stop the consultation. The proposal is not required
Scrap the design sounds the money  on more useful stuff 
Parking
Parking spaces
Abandon it 
None of proposed 
Shared Cycling area on prom instead 
Proper car parking spaces in Battery Place
Notjing as its a waste of time and money
No cycle roads and paths fixed and maintenance 
As a frequent cyclist and walker I see no benefit in this proposed concept!
None 
Not needed
Nothing 
Don’t do this
I don’t feel we need this 
None, money could be spent on more essential things
No changes needed
Work on the promenade and seawall at Arbeg . Try walking on the sloping pavement between th sailing club and Arbeg. Money needs to be spent there
The "design" is all wrong! Here is sufficient infrastructure at present and we'll maintained pavements to allow walking, wheelchair use on this route. Some
pavements could be lowered and additional parking space offered
No design required at all
I would rather there was not such widespread changes to the town. 
Page 230

Page 231

128 | P a g e
www.connectedtp.com 
Nothing, spend the money on the war memorial which is in a disgraceful state.
Leave things as they are
No parking by drop kerbs as a mobility scooter user this would help me enormously
No
More spaces for coaches. Is this area still one way?   North to South direction or West to East means exit from bus appear to exit at the seaside meaning
restricted space to disembark 
Scrap it
What a prodigal waste of time and money thought up by someone who has to come up with change of some sort and can’t think of anything else. The route is
already used for cycling in three ways. First the road then the existing pavement and also walkway along the bay and two of these ways are already used for
walking.
If there must be a cycle lane, use the promenade and either widen the road along Battery Place to allow car-parking both sides of the road or allow dedicated
car-parking on the pavement where the cycling lanes are proposed along Battery Place
Totally unnecessary 
No bikes
More use of existing promenade rather than roadway.
Fix the sea wall on the Ardbeg Road 
Your centres
Don't do a cycle lane 
No changes
Raised surfaces on carriageway to denote pedestrian priority, would like to see this from Albert Pier to Pavilion ideally, but definitely at area between guilford
square and pier and at designated crossings
It’s unnecessary for the volume of cyclists 
I would like more parking for cars
More room for cars to park on coastal side from Albert pier to Glenburn by reducing size of pavement, with cycle lane nearest gardens.
I do y believe it’s necessary
Cancel the idea in the first place
Signage for cycling in the countryside and not the town
No changes to present situation required 
Im against the bike route our town has problems that need money spent on them first
N/A
Better parking both locals and visitors on the island 
I don't like orthink Bute needs this design or rout
Safe parking 
Not needed scrap it  cause more congestion 
Page 231

Page 232

129 | P a g e
www.connectedtp.com 
Proper consultation with locals.
Reject: what benefits to the community 
Unsure 
Just don’t do it the people of Bute don’t want it
bin it
N/A
Working public toilets 
None it’s not suitable 
Pedestrian crossings
Fixing sea wall 
None
Visitor parking
Proper separation of cyclists from pedestrian routes.  Joint user routes, even with white lines, are increasingly dangerous.
Improved pavements
More parking on Battery Place
Like many others in the local community, I do not want this project to go ahead
Extend route to entire island or at least to Port Bannatyne
It's not needed
Not needed
Visualisations of core changes from pedestrian view
No comment
Unnecessary
We don't need any changes. Waste of money. 
Scrap 
Why not use the existing promenade 
Don’t bother with it 
This whole idea should be scrapped
Sustainable maintenance costs for local council
We need more car parking not less. We have an ageing population, I would inmagine they would find it difficult to cycle to the shops everyday. 
Parking is hard enough
None - scrap it is it not needed
Abandon this project 
1, Don't want it 
I think the whole idea makes no sense.
Page 232

Page 233

130 | P a g e
www.connectedtp.com 
Fix various steps down to beaches
None of it
No cycle route necessary - improve the prom instead 
Not to be built
Scrap it and use fund elsewhere
Fix roads
The cycle path be rethought as it will not enhance the Isle of Bute
Put the cycle path on the esplanade
No need for it
Make roundabout bigger.Make sure cycle path is not in front of a bus stop. Do not make pavements narrower. Consider sight and hearing impaired
N/a
Ensure that the cycleway is safer and faster than using the road. This means clear delineation between the cycleway so that pedestrian users of the
promenade, road crossings and bus stops do not stray into the cycle lane.
Reduce pavement to allow vehicles easier access for parking in battery place
Safer pavements to walk on and not to be cycled on.  More parking spaces made available.
N/A
Scrap the project
It’s not necessary 
A more imaginative scheme that includes the sea front walk so it can fully integrate walking and cycling.  
I would include COMMON SENSE! I would NOT go ahead with this idea!
The design is a total waste of taxpayer’s money.
Leave
Don’t do it
Don’t think this design is necessary 
More car parking, less electric charge points, less taxi parking space
None a cycle path isn’t required 
some of it looks good.   something needs done
No "floating bus stops"
Don’t build it it’s not wanted or needed
This is a waste of money and not needed 
Leave it as it is
I would like more consideration to be given to the safety of pedestrians with consideration in particular to those with  disabilities 
More consideration of pedestrians using the proposed floating bus stops - which are dangerous and difficult for the elderly / disabled / wheelchair users /
prams / visually impaired impaired individuals etc. 
Page 233

Page 234

131 | P a g e
www.connectedtp.com 
Unnecessary plan
A longer route to go along to Ardbeg. 
Ridiculous idea
Not required 
Object to any changes
Don’t feel there’s any need for it
Prefer it not to exist
Better ease of parking and access for larger vehicles
Car parking
More parking spaces for vehicles as the island had an elderly population.
Evidence that it is needed. The design is ill thought out and will cause considerable difficulty with access to the pier. There will be restrictions in parking too
and as owner of the Veterinary Surgery in Argyle Street this will cause difficulties for clients accessing our surgery with ill pets. You do not seem to be
interested in the views of the Rothesay business community who will be seriously affected by the creation of this and the consequences.
Discarded
Consideration for existing users of this route
We don't need a cycle lane. It's a complete waste of time and money 
Additional parking along Battery Place
Pavement extended to Kerrycroy
this project is not needed or wanted and you are ignoring people’s feedback
Stop trying to force what is clearly not wanted 
The current proposals do not offer socio-economic value to the local community. 
Don’t want cycle lane
To not happen 
Using existing space such as esplanade/pier etc plus ground signage etc rather than wasting money on whole new construction. 
I do not think the proposed route would be used anywhere near enough to justify the disruption and inconvenience to others. 
More money spent on the buildings that are empty 
More car parking spaces for Battery Place
Unnecessary design.
Maintain parking on the section along Battery Place towards the Glenburn
Car parking pass along Battery Place
front green should be included
More traffic speed controls
Page 234

Page 235

132 | P a g e
www.connectedtp.com 
Complete ban on parking along Gallowgate (enforced) and enforced short term loading only. This is the most dangerous section of road for pedestrians and
cyclist alike and the traffic regularly blocks the roundabout due to illegal parking here. Enforcing parking resections would help to improve safety far more than
this scheme.
██████
Not needed here
Cars parking along the side of cycle path can open doors onto cycle path and can put cyclist endangered
Pavement area for walking
Scarp it
Total segregation of walkers and cyclists
.
More parking
Consider an area that needs improvement and not the front of Rothesay
Use the prom 
Page 235

Page 236

133 | P a g e
www.connectedtp.com 
What changes would you make to the design?
None
Covers for cycling lanes, more parking
Add more parking space for taxis as in somedays they're needed a lot, so instead of 4 spaces i would say that 5 is a better5 option
Covers for cycling lanes, More Parking 
none
a place for skateboarding 
nothing really
rain cover for bikes
more room at ferry terminal's 
sfghsfghfshg
improved clarity of crossing points
The part that goes parallel to the prom could be omitted and make the prom shared pedestrians/cyclists. I also am a little concerned about what happens to
get on and off the cycle lane - if you needed to cross with your bike. I find in other places that it's the transitions that cause problems.
cycle rute to the school ,more nature .
Scrap it 
Scrap design
Not beeded
For it not to go ahead
It’s not needed
Scrap it
No parking box outside bed shops yard needs to be at least 2 metres each side to allow swing for vans and vans with trailers enough swing to use the yard as
it’s used daily
Scrap it
No money spent on it. The discovery centre needs to be saved and the facade of the front is in ruin. Do something that will actually benefit the community
instead of this box ticking exercise
Better pedestrian crossings
Scrap it, see above 
Cancel it completely 
No cycle paths 
None, scrap it.
Not needed
Not needed
Cancellation x 3
Page 236

Page 237

134 | P a g e
www.connectedtp.com 
I wouldnt start it
Cancellation of this idea.
Scrap it it’s not required and not wanted by the community, this is plain to see online 
Please don't waste the money and get something the island needs
Don’t do it
Cancel
Island doesnt nees a cycle path on the prom when the prom is a perfectly good cycle place as it is
Give it up completely and spend the money on something better.
Cancel all
Scrap the whole lot. 
Scrap it. Scrap it.scrap it.
Change route to includes areas without already well defined wide spaces for active travel 
Scrap it
I would scrap the design
Scrap it all together
Scrap it
Traffic not heavy enough and not enough cyclists to warrant a cycle lane
No change don’t build it
The whole design is not needed 
Cancel the whole plan
Scrap it
As above
All of the above
Remove all together
I would cancel the whole thing
Not too happen
Scrap cycle track
Cancel it
As question 5
None don’t agree
Scrap it
Scrap the whole design, waste of time and money
Making any changes as this is an unnecessary waste of money
Page 237

Page 238

135 | P a g e
www.connectedtp.com 
The whole concept.  You have taken the safest area on the whole island when there are many more places like the high St for instance that would benefit from
a cycle path.
Scrap these plans
Don’t want this to happen 
Scrap it
Scrap the whole designe and project , waste of public money 
The lot. Scrap and spend on other things 
Drop the whole design
Not 
Scrap it 
No need for cycle path
Less destruction of green land
Scrap the design 
Quite happy with the existing design that has been there for over 100 years.
Not to proceed with it.
Scrap it
If it was put in the bin 
I'd look at sea defences first.  No point in introducing new scheme until the sea defences eg next to the prom are repaired.  Global warming will cause more
extreme weather in the future and protecting sea defences is the main priority.
The hole thing 
Abort
Not to extend to glenburn road
More parking is needed for cars. We do not need a bike lane and I’m a regular cyclist.
Not really needed
Scrap it 
Of little or no use to the community as a whole. Expensive mistake
Scrap plan
Where do you cycle after the pavilion 
Do not do any of it
More parking and seperate area for tour buses 
scrap it completely.
Cancelled waste of money
No cycle lane required
I wouldn’t implement the design without being sure that there is an actual need for something like this. 
Page 238

Page 239

136 | P a g e
www.connectedtp.com 
For it to not exist 
None, waste of time and money 
For the design not to exist 
Scrap it, 
Get rid of it, not needed
Scrap it altogether
Shred it
Not installed 
Parking
Wouldn’t have the proposed path , there is more needing done to the town than this path
None
Scrap it8
Shelve the idea altogether 
Delete the design. No need for it.
Cycle lane on existing prom/path
N/A
Reject the design .
Buy paint for the royal hotel instead 
More parking for cars 
Make more use of the prom space.  There is already wide pavements & prom from town to pavilion 
Cancel it not what the town needs
Abandon completely 
I don’t feel that this design meets the needs of the island  Bute generally is great for cycling at present as someone who cycles regularly on the island
The whole scheme is a ridiculous white elephant
Discard it
Stop the process now! 
Scrap all together other things need attention first 
Leave it .
See no point in this if parking restrictions are not enforced 
Do not agree with this design
not needed
See above 
Scrap it
Relocation of the project to a location more in need.
Page 239

Page 240

137 | P a g e
www.connectedtp.com 
Scrap It
Change it completely invest in parking space, support locals encourage tourists 
No route for cycles required
Not have it happen 
Cancel it
Cancellation
As for Q5
Good surfaces
Do nothing there is ample space for safe travel and the accident records prove that.
Concentrate funding on actual problems. Railings, poor buildings on front, fixing damaged pavements. 
Not required 
It's not needed at all
Leave as it is
Listen and take heed of the opinions clearly expressed on local social media pages.
Delete 
Revert to main housing to school routes
Scrap the design and put money to better use 
Scrap it
Scrap the design 
Cancel it
Abandon it! 
Scrap it altogether
Move it
Don't build it. Waste of money 
Use the money elsewhere.
Scrap it,scrap it,and scrap it
Get rid of it
Spend the money elsewhere
Money to be spent elsewhere
Scrap it
Cancel it completely – it’s a waste of money that (in the Scottish government didn’t ring fence stupid spending) could be spent on more pressing problems.
No scheme needed - proposed area is very safe already for pedestrians 
Scrap it 
Not needed better things to spend money on
Page 240

Page 241

138 | P a g e
www.connectedtp.com 
Throw in the bin
None, leave as is
Stop the cycleway from the peir to the glenburn
Scrap it altogether
Just leave it the way it is 
Take away cycle lanes, they won't stick to them anyway. 
Want to spend money on fixing pathways 
None
Not required 
I wouldn’t have it in the first place. 
Forget it! Forget it!! Forget it!!!
See 5.
it's not needed 
It's not needed
None of it- washing money ABC just like you have on the pavilion. How about reducing prices for the Bute Highland Games in OUR PUBLIC park.
For the idea to be scrapped 
I wouldn't use it.
Not to go ahead 
None, scrap it and do something more beneficial for the community and visitors alike!
Fix the pier 
Cancel the plans
Change it so that it doesn't happen
Maybe have someone that listens to the local voices head it
Cancel it 
I’d scrap it altogether! 
Scrap it
Bin it 
Just spent the money on fixing out roads u know the potholes 
Don’t do it
Wider walking/cycle route
Replace painted separation lines with kerbs and a different surface to prevent pedestrians and cyclists from using same space
Location of dropped kerbs for wheelchair or other mobility aid users
There’s already wide pavements between these two locations on the sea side of the road
Cycle route  rubbish idea 
Page 241

Page 242

139 | P a g e
www.connectedtp.com 
Scrap the plan. 
Bin it 
I’d put the design in the bin 
As above not bother doing the work
Scrap everything
Make paper planes
Scrap the project
Abandon the idea 
I would drop it  
Please spend this money on maintaining existing paths, roads and railing
Scrap it
Just improve the road and pavement surfaces we already have.
Rip it up and burn it 
Scrap it 
I don’t want the cycle track
Am concerned about the proposed width of access into the ferry port for HGVs / Coaches / Larger Vehicles coming from Victoria Street. Proposed access seems
very small and it appears that drivers would need to "Double Back" on themselves
Scrap it
Not needed 
Scrap it
Improve existing road for driving
Don't do it to begin with 
Rip it up
Don't do it
Scrapped
Keeping the taxi rank as it is
Not needed 
We don’t need it
Scrap it
Ditch design and repair existing walkways 
Get rid of this numpty.
Move it completely it won’t be useful to the community 
Scrap it
To abandon idea
Page 242

Page 243

140 | P a g e
www.connectedtp.com 
Money spent on more pressing matters 
Scrap it
Scrap it.
Cancel the plans
SCRAP IT
Removal of the cycle lane
See answer to q.5
This is not necessary there is plenty of space for cycling and walking. Focus on more important issues 
Scrap it
None – shouldn’t go ahead
Cancel this before you waste more public money on a pointless scheme 
Erase them all and fix potholes 
Don’t do it
Don’t do it
Scrap it
Just don’t do it
For it to be shelved 
I’d leave the existing ‘route' exactly as it is 
More free parking
Cancel it 
Move it to town to School campus route. This route would improve things for the school,college,sports centre, health centre and hospital.
Scrap it completely
Scrapp it
Cancel it, already a very safe route along the promenade
Cancel it
Na
Cancel the project 
Scrap it
Prioritise space given to walking path. 1.5 is far to.narrow for families to walk together. I am a cyclist and would not use the path underhand circumstances. I
have had experience with this sort of design. When the walking space is squeezed pedestrians simply spill over into the cycle path often causing it to be
unavailable or increasing the risk of collision. Young children especially jump low barriers or use them as climbing entertainment. I have had a few near misses
so simply would avoid them
Don’t implement any of it 
Scrap it and spend the money where it's actually needed and would benefit more people
Page 243

Page 244

141 | P a g e
www.connectedtp.com 
N/A
Nothing really as I haven't seen the design 
Personally, I’d throw it in the recycling bin.
None
Cycle lane not needed
Scrap it
Move it to the prom which will give more space and not impact vehicles
Rip it up
There is absolutely no need for a cycling path on this stretch of road whatsoever. 
Scrap it 
Move it elsewhere it’s not required. 
Scrap the whole thing - a waste of money
Move rout to seafront.
Get rid of it 
No cycle lane 
Give up with this stupid idea 
Scrap it 
Consult the community in advance of proposing a solution to a problem that  the community and visitors do not consider to be a priority 
Scrap the idea & use on other area that would benefit from wider pavement like between Port Bannatyne & Ettrickdale that frequently gets used by
pedestrians & some cyclists prefer to use the footpath rather than the road but the footpath isn’t wide enough for pedestrians & bicycles 
Cancel it
Scrap it 
Spend it on a play park
Scrap the plans
The placement of the route heavy volumes of traffic around the pier are dangerous enough without adding to it!
None.
The route, the pier is extremely dangerous with the constant heavy flow of traffic adding more to the mix will be sure to result in an accident! 
Put cycle path on the Promenade not the road 
Cancel the project
As above 
Scrap the whole project
Nothing wrong with what we have
Resurfacing of the existing promenade 
Disregard whole thing
Page 244

Page 245

142 | P a g e
www.connectedtp.com 
Scrap and start again
Not required on island
None.
As above
Sack the guy with the white BMW who had the check to illegally park his car at the presentation 
Scrap it
Leave the existing infrastructure.
Abandon it all
We don't need this
Scrap
The loss of parking fir taxis. Parking removed from cars on Victoria Street, the extended pathway will lead to congestion
Make more use of existing infrastructure eg the prom
Abandon
Lose the cycle lane
Not required 
Discard the narrowing of the vehicular access to the ferry lanes
Incorporate some more parking around the pavilion 
Scrap it
Not sure 
Make it longer in the future 
N/A
Scrap the lot
Scrap all of the proposed idea. 
More spaces for taxis
None
No design not needed
I'd stop making changes that aren't required.
none 
Just not do it
Leave as it is
Reduce cycle lanes
Not to proveed
Scrap it
Scrap it 
Page 245

Page 246

143 | P a g e
www.connectedtp.com 
None
Unsure
Scrap it
Don’t do it 
Extend length, 2, 3
Scarp it all 
The design 
Scrap the plan
Parking on Battery Place pavement 
Scrap it
Scrap it completely
to not move ahead with it and use the money elsewhere
Waste of time and money as not needed 
Scrap it altogether, waste of time, money and effort.
We don't need a cycle lane running through our town 
Stop it all together as it is an unnecessary project and a complete waste of time and money. 
Have no bike lane
Scrap it completely 
Plenty of dropped kerbs and disabled parking bays as there is a shortage of both then people park illegally in them
Drop the whole thing. This is going to have minimal positive benefit and numerous negative effects
Cancel
Scrap it 
Keep bishop st roundabout same size
I would better invest the money in a cycle path in the countryside similar to the West Island way. 
Scrap the plans
For it to be binned
N/A
Scrap the whole idea.
Scrap it and don’t come over here parking on pavements and double yellow lines, telling us what is best
Cancel whole design. Not required.
Don’t do it
Cancel the whole plan. 
Scrap the plans
Scrap it.  Cycling lanes are seldom used.
Page 246

Page 247

144 | P a g e
www.connectedtp.com 
Don't agree with the design and would not include a designated cycle lane
Make like Poland which shares cycling and pedestrian use
This is simply not needed or wanted by us who live here.
None, not wanted at all
See above 
Buildouts are pointless with this level of traffic
None
Could it not go along the prom in places where the prom is very wide?
Scrap it
Scrap it
Scrap it
It's a waste of resources money could be spent on other pressing matters 
Scrap it completely 
Stop stop stop now
The location, Ardbeg to Rhubodach makes far more sense to offer cyclists a path.  Forget the changes at the ferry lanes if the location isn’t changed.  Don’t
take away car parking on Victoria STREET
I’d scrap it completely
Put it in the bin
Fix pot holes in road
More taxi space. No cycle lane as won’t get used 
Don't do it, utterly pointless and has no benefit to community 
? No commented derelict building at pier 
None 
Scrap it.
Don’t do it
Scrap the whole thing, it needs to be totally reevaluated 
It’s waste of our money !
Cancel it
Scap it
Bin it
Scrap it
Bin in
Don't bother , redirect the money where it's needed
Scrap the whole idea
Page 247

Page 248

145 | P a g e
www.connectedtp.com 
Stop it altogether
Abolish it
Cancel it
Parking for cars
Battery place pavement should be parking area. Taxi rank needs more spaces ( huge user group on bute ). More drop kerbs lined up on both sides for
wheelchair users.
Spend the money elsewhere
Spend the money on something more essential 
It not being there
Rub it out!
Lose the traffic congestion areas
Scrap the whole idea
Scrap it
Don’t design it
Don't do it
See anove
Would not go ahead
Take away the cycle path as these roads are safe
I would erase it and leave things as they are.
SCRAP THE PLAN: LISTEN TO THE MAJORITY.
Bigger entrance to ferry lanes 
Listening to the community and not going ahead with the cycle route. 
Pedestrian crossing with 'lights' where you cross over to go to and from the ferry terminal (over the bridge).
scrap it
Just don’t need it scrap the idea 
do not proceed with this
Reject the proposal and fix the roads and pavements on Bute 
Parking spaces
Completely unnecessary 
No bike lane
Abolish  it
Not needed
Project is a waste of money 
Scrap it
Page 248

Page 249

146 | P a g e
www.connectedtp.com 
Get rid of it there is no need for wasting money on something so unnecessary 
Do not want cycle paths
Extension of cycle path as above.
Scrap it and spend the money on something more important
Scrapped totaly
Don't do it
Make the cycle lanes on the promenade that's already more than wide enough to facilitate them
Place the cycle route on the prom and improve the signage and sight lines for the elderly drivers on the island
For the money to go to better use on the island
Scrap the design
Scrap the whole thing 
More parking
Cancel this pointless project
Scrap it 
Complete waste of money 
LISTEN & actually do as community wants & not waste money & cause unnecessary upheaval for islanders.
Scrap the whole ridiculous scheme
Srcap the whole idea
Reject it
As a frequent cyclist and walker I see no benefit in this proposed concept! Improve the existing road and pavement surfaces
None
Scrap it
All off it
Don’t do this 
I don’t wish for any of this
Scrap it
No changes needed
Abandon it
I think it warrants full reconsideration
Design not required at all. Leave roads and pavements as they are
I would use the money to improve the promenade and walk ways already present on the island
Scrap it.
Don't change anything leave as is
None 
Page 249

Page 250

147 | P a g e
www.connectedtp.com 
Put
Attention to parking at Battery Place 
Make more parking for cars and free
If taxpayers money is involved I would advise that this unnecessary project should be reviewed.
Abolish the project. Simply because central government is throwing funds at Council is not good enough reason to impose an unwelcome plan on residents.
Not needed
Scrap it 
Move all cycle traffic to existing prom area. Keep existing wide access to ferry queuing. Sack ‘consultants’ to save taxpayers money
Scrap it and do something that's actually beneficial 
Scrap it
Don't do it
No changes
Coach parking in albert pier away from harbourside
Scrap it.
As above 
Not sure
I don’t believe the proposed is needed, maybe for a very few
Cancel the idea in the first place 
Scrap it. Its not needed and will cause a lot of problems and accidents. Unfortunately most, not all cyclists now seem to think they have overall ownership of
the highway. They are silent, and dangerous. 
Leave the roads as they are
The council should be ashamed of themselves if this is allowed to happen 
N/A
Scrap it - the number of Glenburn guests using bicycles is negligible. 
The money should be used for more pressing needs in the town 
No need for separate cycling lane
Nothing  scrap it 
Scrap it
By tearing it up or shredding it and putting it to recycled into something useful like a blank sheet of paper.
I think the location is wrong. I would rather see a route to the school via the meadows.
Don’t do it
bin it
N/A
Working public toilets 
Page 250

Page 251

148 | P a g e
www.connectedtp.com 
Scrap the idea isn’t suitable for the island 
Dont think it is necessary for this area. 
Clean up the Island first 
Didn't want it at all
The narrowing of the entrance to the ferry queue
Remove cycleway between pavement and bus stop. The prosed plan would create more danger than it would prevent
Motor cycle parking  
Make sure the roundabout is big enough for buses to do a complete turn on
Scrap the entire plan
None
Wouldn't have it done
Scheme not need3d
Extending the route to Mount Stuart and/or to Ardbeg
Assuming getting rid of the design is not  an optionssue seeing my answers below
Scrap
Scrap it. We don't need it.
File it away, not needed 
Not reduced access to pier 
STOP
Stop it 
Take a black marker pen and scrub it out
Scrap it. 
Exclude cycle path put in zebra crossing at discovery centre
None - scrap it is it not needed
Abandon this project 
Scrap it & use the money for something useful 
I would scrap the whole thing.
Scrap the cycle lanes
Object to it - no need for this work
Spend the money improving Albert Pier parking area
Scrap it now before wasting more money
Is this the best way to spend the money when the rest of the town is a mess
Don't 
I would take it back to the drawing board and listen to the residents.
Page 251

Page 252

149 | P a g e
www.connectedtp.com 
Scrap the plans entirely - complete waste of money and a danger to pedestrians 
Don't waste money on
Make roundabout easy for buses and Lorrie’s to use.
Scrap it 
Think about the ends the the cycleway. Too often the cyclist is just directed back onto the road at an inappropriate or even dangerous place. What about
cyclists who are travelling in the opposite direct (Glenburn to Pavilion)? How will they be encouraged and enabled to cross the road safely without interruption
to their journey? Could the cycleway continue on the promenade as a dual-use track shared with pedestrians beyond the Glenburn and Pavilion?
Scrub the hole idea 
Do away with a proposed cycle route as cyclists already have use of the road.
There is no need a cycle line for battery Place 
Not to go ahead
Use the budget for something we need
Re routing the cycle lanes to fully integrate the sea walk promenade 
SCRAP IT! 
Scrap it in its entirety. 
No changes 
Don’t do it
Would not implement this to start with 
Already stated
I’d scrap 
the entrance to the pier, is it too small
I'd scrap it. I don't see any need for it and I'm a cyclist of many years.
Don’t do it x3
This project is waste of time and money 
Scrap it now
Clear signage to mark the end of the route and a safe route back onto the road
I think the design as a whole is a "solution looking for a problem" and as such I think it should be scrapped. We have a perfectly adequate multi-use esplanade
that covers the majority of the route. Cyclists and motorists should be able to share the short stretch of roadway as it exists.
Cancel the whole scheme
The taxi rank probably needs more spaces. Your design shows 4 spaces only.
Don’t do it
There is not enough car parking 
Object to the whole design. 
Scrap it
Page 252

Page 253

150 | P a g e
www.connectedtp.com 
None. Bin it
Vehicle entry to ferry terminal too restricted especially for large vehicles 
Scrap it
Scrapping it.
Scrap the idea, observe the existing traffic through town, and acknowledge that the idea is needless.
N/a
..
I would cancel altogether
We don't need a cycle lane. It's a complete waste of time and money 
Remove the pathway from Victoria Street – it’s not needed
Pavement extended to Kerrycroy 
All of it. This is not a required project
Where are the other 4 taxi rank spaces? 
Whilst the proposed scheme appears to offer no benefit to the community, the design also fails to consider the opportunities available under the Cycling by
Design Manual. Almost the entire route could benefit from utilising existing footways on the sea-side of the flood wall along the whole route, by developing
them into a shared cycle and footway, as per chapter 3 of the manual.
Don’t want cycle lane
Cancel
See 5
Findings that were undertaken to justify this proposal should be made public - how many people are in favour of it?
Put money into the places that need attention 
Do away with whole project 
Cancel whole thing.
Maintain parking on the section along Battery Place towards the Glenburn
Abandon the scheme altogether
more taxi spaces
Although probably not possible at this stage (but could be something for the future), and if opposition meant that the section along Battery Place was
abandoned, it would be good to extend the scheme as far as Port Bannatyne. This would give a connection between the two communities and, also, provision
for pedestrians who frequently use the northward route from Rothesay for exercise.
Improve the existing footpath along the sea front at Battery Place and provide proper parking on the coast side of the road to separate pedestrians. This would
also make it safer for cyclists.
Victoria Street - High Street - Ferry terminal junction: No pedestrian island nor bikelane across the north facing side. Leave ferry lane access alone. Route
pedestrians/bicyclists in a U shape around the junction, and section off the north-west/north-east edges to discourage non-vehicle traffic crossing the ferry
lanes.
Not needed here
Page 253

Page 254

151 | P a g e
www.connectedtp.com 
Cycle lanes on road and not pavement
Leave the bays same size and not obstructor traffic at chapel hill area
Scarp it
Put the cycle lane on the road
Forget the plan
More parking
Forget it, Scrap it
Scarap it 
.
none 
none 
idk 
idk 
more taxi bays 
traffic lights unnecessary 
fgshsfhf 
sghfsghfsgh 
cycle rute to the school 
more nature 
Scrap design 
Scrap design 
Not needed 
Not needed 
Cancel the project 
See above 
Fire all in charge 
Not to do it 
Just scrap the idea 
The taxi rank would be to small for the 10 plus taxis and buses would struggle to get round a smaller round about 
Scrap it 
And again, scrap it 
Scrap it 
As above 
As above
Page 254

Page 255

152 | P a g e
www.connectedtp.com 
No cycle paths 
No cycle paths 
Not needed 
Not needed 
Use money elsewhere 
Please give the island something that will improve it, as this is not it. 
Please listen to the community of the isle of bute 
Don’t do it 
Don’t do it 
Not required 
Not suitable 
Fix Ardbeg Road shoreside it’s an eyesore. 
Fix the towns eyesores. 
Cancel 
Cancel 
Sack whoever’s idea this was. 
Set fire to the plans.   
Improve the parking bays and introduce more zebra crossings 
Narrowing the entrance to the ferry lanes will create traffic jams, especially if the road has been narrowed 
Spend the money on fixing the esplanade 
As above 
As above 
Scrap it 
SCRAP IT 
Like into something for youths 
Put the money elsewhere 
Impose 20mph limit 
improve parking 
Making any changes as this is an unnecessary waste of money 
Making any changes as this is an unnecessary waste of money 
There is already a safe area for bikes and pedestrians that requires no crossing of roads, so literally all you are doing is paying to put down paint. 
Use the money to put in safe zebra crossings at all the schools 
Listen to the public on Bute 
Stop spending money unnecessarily 
Page 255

Page 256

153 | P a g e
www.connectedtp.com 
Scrap it 
Scrap it 
Na 
Na 
Spent money wisely in the town 
Happen 
To 
Scrap it 
Scrap it 
Finish projects already started 
Fix roads 
Use of areas already bike and walk friendly ie the prom 
Scrap the design 
Scrap the design 
Why not use the existing promenade and widen  at battery place . This would save money on the grass cutting.!! Also other councils have made exemptions
to pavement parking why can’t Argyll and Bute council enforce this ? 
As above 
Wide pavement made into car parking bays 
Bin it 
Bin it 
Improving road safety, but no point in trying to do this if enforcement just means the occasional visit from a traffic warden who doesn't patrol around much of
Rothesay let alone the rest of the island. 
You've not allowed for enough parking.  Adult cyclists prefer to cycle on the road.  Disabled pedestrians will wall on the area closest to them even if it
becomes designated as a cycle lane. 
Parking on Albert pier for coach’s won’t work when people can’t park properly 
Abort 
Abort 
Parking to be monitored 
Sort out paths so not trip hazard 
Scrap it 
Scrap it 
Scrap plan 
Leave taxi rank as it is 
Stop plans
Page 256

Page 257

154 | P a g e
www.connectedtp.com 
More taxi rank space as you seem to have reduced it 
Public toilets so tourists actually want to walk around and explore 
Cancelled waste of money 
Cancelled waste of money 
Children 
Elderly 
and burn it! 
rip it up 
Do it somewhere else 
Leave it alone 
Don’t build it 
It’s not needed or wanted 
Bin it 
Just maintain existing roads and seafront eg storm damage in Ardbeg Road untouched for 2+ years 
Nil 
Nil 
Parking 
Parking 
As above 
Sort roads and pavements we already have 
Scrap the plans. 
To be scrapped. 
Not to lose parking 
N/A 
N/A 
As above 
As above 
Fix the pot holes 
Fix the potholes 
Parking for card 
Public toilets 
Cancel it 
Cancel it 
Provide covered bike storage in town
Page 257

Page 258

155 | P a g e
www.connectedtp.com 
Spend the money in other areas on the island where it’s needed such as road maintenance or dedicated cycle areas out of town on some of the narrower
roads 
Go away and leave us alone 
What part of go away don’t u understand? 
.. 
No cycle lanes 
Waste of money 
not needed 
NOT NEEDED 
See above 
See above 
Spend money on something of benefit to community 
Waste of money when these areas are safe, when was there an accident??? 
No cycle path between Glenburn Road and Rothesay Pavillion 
No Road alterations between Glenburn Road and Rothesay Pavillion 
Do not take up space on the roads for cycle lanes 
The design is ridiculous and would cause chaos on our roads 
Stop wasting money on this proposed project 
Not have it happen 
Not have it happen 
Cancel it 
Cancel it 
Cancellation 
Cancellation 
None 
None 
Do nothing there is ample space for safe travel and the accident records prove that 
Do nothing there is ample space for safe travel and the accident records prove that 
Building improvements 
Fixing damage 
Spend the money on repairing the promanade 
Listen to views being clearly expressed by local residents using platforms beyond your lazy survey which can’t even get street names correct. How insulting
that is to local people!
Page 258

Page 259

156 | P a g e
www.connectedtp.com 
You should have advertised the link to the survey clearly and repeatedly on local social media sites. Feedback from dozens there clearly state that until
recently they had no idea where to find the survey to express objection 
Change it to something that would provide an are fir kids like battery park in gourock/greenock 
Only spend money on changes that will improve life's or increase economic growth 
Scrapping it 
Scrapping it 
Sack the consultant 
Start spending it on the pavements replacing cracked slabs that have been neglected for too many years. Oban has no cracked slabs. 
Cancel it 
Cancel it 
Use the prom which is already there 
Use the money elsewhere. 
Use the money elsewhere. 
Put in bucket 
Rip it up 
Money saving 
Reinvesting the money elsewhere 
Cancel the plan. Redirect the funds to higher priority problems. 
See above (there can only be one MOST important change. 
People need to have car parking spaces 
You are narrowing already narrow roads 
Waste of money 
We the community of Bute don't want it.. 
Leave the taxi rank 
Scrap the idea 
More parking for cars in battery place by making the pavement narrower 
The head of the pier is already a dangerous junction when the ferries are busy so not making it worse 
Want to spend money on fixing the roads 
Want to spend money on more disabled parking spaces 
Nome 
Scrap the whole project! 
Spend the money of more worth while causes! 
Why has this been allowed to continue in the face of public opinion. 
it's not needed 
Page 259

Page 260

157 | P a g e
www.connectedtp.com 
it's not needed 
None of it- washing money ABC just like you have on the pavilion. How about reducing prices for the Bute Highland Games in OUR PUBLIC park. 
None of it- washing money ABC just like you have on the pavilion. How about reducing prices for the Bute Highland Games in OUR PUBLIC park. 
I'd throw it in the bin 
Just scrap the whole idea. 
Fix pot holes 
More public toilets 
Pen pushing, box tickers from the council 
Put project in bin 
Spend money on better things for community 
A cycle lane up High street to the Joint Campus would be more beneficial to the community. 
Waste of money. The community does not want this!! 
Scrap it 
Scrap it 
Move on to somewhere else. 
RIP the proposal up 
Don't change anything! 
This will causes a issue with parking 
Don’t do it 
Don’t do it 
More benches 
Don’t mess up the roads 
Move it into the prom 
Don't  need this on the island 
Waste of money 
Scrap the plan. 
Scrap the plan. 
Big bin fit consultants in 
Spend the money on something the Island needs 
Cancel it. We don’t want it 
WE DO NOT WANT OR NEED THIS 
As above 
None required 
As above
Page 260

Page 261

158 | P a g e
www.connectedtp.com 
As above 
Better use the money on other services 
Cancel all plans 
Stop the whole idea !!! 
I would leave the route unchanged 
Leave the area untouched 
Please spend this money on finishing pavilion 
Please spend this money on royal hotel 
Scrap it 
Scrap it 
Do not waste the town 
Stopped prepositions 
Burn it 
Ripe it up 
Keep the Bus Stop Lay-bys. Current bus stop lay-bys allow all other road users to pass when buses are picking up passengers. Moving the bus stop into the
road will inconvenience other road users, thus causing congestion / increasing exhaust emission levels 
Reinstate parking outside Rothesay Pavilion. Parking here will be especially required when it eventually reopens 
Burn it 
We don't want it!!!!! 
Spend the money on something that the community actually needs 
As above 
As above 
Don't do it 
Don't do it 
Repair our paths and roads 
Use the cash for repairs 
Scrap it 
Scrap it 
None 
None 
None 
Stop it going ahead 
Scrap it 
Scrap it
Page 261

Page 262

159 | P a g e
www.connectedtp.com 
More public convenience open for longer 
Spend the money making appearance more inviting. 
Not needed 
Would be detrimental to the area 
4 taxi bays ? There are 11 taxis in Rothesay and every one of these spaces are required 
What a waste of money. The council budget will never cover the cost of maintaining this 
Stop 
Not going ahead with the project 
Stop wasting money 
Dont do it 
Leave the community alone 
Do nothing 
Do nothing 
Move the route 
Cyclists are a bloody menace - keep cycling on pavements and nearly knocking people over especially the blind and partially sighted who don't see them
coming 
Just don't do it!!!!! 
See above 
See above 
Cancel the project 
Cancel this wasteful project 
Scrap it 
Scrap it 
Cancel the Albert Pier to Glenburn stretch as this stretch of road needs more off road parking 
Nothing 
Use the existing esplanade 
None 
None 
Change size think of the lorry’s and tractors using the road 
Needs to be moved as you can’t make the roads smaller 
Don't do it 
Forget it 
There is absolutely no need for a cycling path on this stretch of road whatsoever. 
There is absolutely no need for a cycling path on this stretch of road whatsoever. 
Page 262

Page 263

160 | P a g e
www.connectedtp.com 
Pavements sorted 
Pot holes sorted 
Move it elsewhere 
Where are people goi g to park in Victoria Street. Parking is restrictive enough. 
Survey aimed at walkers and cyclists. Ask drivers and local shops what would be best for town 
Take away the restrictive entrance for vehicles your design shows. 
Ferry terminal entrance 
Ferry terminal entrance 
No cycle lane 
Sack  mark arrogant and incompetent 
Give up with this stupid idea 
Give up with this stupid idea 
Scfap 
Scrap 
Do not hinder access to ferry terminal . It is creating a conflict between users and inviting a collision 
Cancel it 
Scrap the whole idea 
Scrap the whole idea 
Scrap the plans 
More carparking in town 
Upgrade the Promenade surface and seawall 
Ditti above, it is not required. 
As above 
As above 
Just stop this project 
Use the money for this project for something else 
Consultation into a cycle path between Port Bannatyne and Ettrick Bay 
Painting a specific cycle lane on the existing promenade 
No needed 
Cycle lanes will not be used 
Improve the parking at Albert Pier - Cars parking 30 mins limit 
Not required on island 
Not required on island 
Scrap it
Page 263

Page 264

161 | P a g e
www.connectedtp.com 
Cancel the whole plan 
No improvements to existing route needed 
Abandon it all 
Abandon it all 
We don't need this 
We don't need this 
Cancellation 
Stop wasting money on white elephants 
I don't think preventing traffic from turning left into the ferry queue is realistic.  Maybe an all red phase on the lights for people to cross in all directions.  Also
lights need to stay on green when the ferry is unloading, otherwise the turnaround of the ferry can be delayed and active travellers miss train connections! 
Provide somewhere dry for cyclists who are waiting to board the ferry.  Only needs a small bus shelter.  How does making people with bikes stand in the rain
for ages in the middle of winter encourage cycling?! 
Coach parking isn’t adequate 
Taxi rank isn’t big enough 
See above 
See above 
Discard the unnecessary cycle lanes 
Do not add light control of crossings - "zebra" style crossings more than suffice 
Incorporate more cycle parking 
Do not implement these proposals 
Once they start this it will expand all over town to tap into the funding. 
Not sure 
Not sure 
Connect 
More dropped curbs 
Scrap the lot 
Scrap the lot immediately 
Scrap all of this idea. 
Scrap all of this idea. 
instead of roundabouts make crossing 
None 
None 
No design not needed 
No design not needed and I cycle regularly 
Page 264

Page 265

162 | P a g e
www.connectedtp.com 
Don't do the redesign 
Nobody wants it. 
Absolutely no need to do it 
Pure nonsense 
Spend the money on route up to the school or out to port bannatyne 
Used the esplanade 
Scrap it 
Scrap it 
Scrap it 
Scrap it 
Extend length 
Scrap it 
Scrap it all 
Because we don't need it 
Means nothing 
Increase taxi rank 
Not to encroach ferry terminal parking 
And again 
Scrap it again 
Scrap it completely 
Scrap it completely 
Scarp this as waste of money put money to kids soft play or sumilar 
Scrap as not needed, as a daily cyclist plenty of room in road, pavement and promenade already 
Ditto 
Ditto 
For it to be completely binned. The roads are too narrow and the pavements are required  eg  walkers, wheelchair users and prams. It would restrict the
number of essential taxis at the rank. Cause congestion and stop traffic from getting easy access to the ferry therefore causing more congestion.  nu 
Not to happen it is the most stupid and inconsiderate idea, there are other places in Bute where it would be better to put a cycle lane eg out past the yachting
club and Skeoch woods, a much more sensible area. 
Have no bike lane 
Have no bike lane 
As above 
As above 
Ideally spend the money improving the safety of the pavements at Ardbeg and Ettrickdale
Page 265

Page 266

163 | P a g e
www.connectedtp.com 
If the money cannot be spent improving current active travel walkways, the give funds back and don’t waste taxpayer’s money. 
Don't waste money on it 
CalMac port entrance - new design is completely impractical 
Gallogate Roundabout is very difficult to navigate on foot and need complete redesign with crossing for walkers/cyclists 
Scrap tje plans 
As above 
As above 
Scrap the whole idea 
Scrap the whole idea. 
Scrap this and listen to the community 
Scrap this and listen to the community 
Use the money elsewhere like to widen the pave,EMT and improve routes up to the campus 
Use the shore side paths 
Use the money to fix the pa event and fence on Ardbeg Road 
Use the money to fix the prom 
None 
Waste of money 
Cut cost so can do other work. Signage to cycle track along sea wall 
Use a lane in sea walk 
Retain parking improvements 
Scrap it 
Scrap it 
Scrap it 
Scrap it 
More parking 
It's a waste of resources money could be spent on other pressing matters 
It's a waste of resources money could be spent on other pressing matters 
As above 
Forget the idea 
Cancel the whole thing 
Scrap this nonsense 
Location - not needed for the area you’re proposing.  Change location 
LOCATION, LOCATION, LOCATION 
Leave the island alone and scrap it
Page 266

Page 267

164 | P a g e
www.connectedtp.com 
Listen to the residents and scrap it 
Don't do it, utterly pointless and has no benefit to community 
Don't do it, utterly pointless and has no benefit to community 
Speed control for cars etc 
Leave route as it is 
Leaving route as it is 
Look at better routes, for example a safe route for children to cycle to school. 
Stop wasting more money on these surveys, if you are not going to listen to the views 
Cancel it 
Cancel it 
Burn it 
Rip it up 
As above 
As above 
Scrap it 
Scrap it 
Battery place left dide pavement should be parking. This will encourage visitors to leave car and walk to town. 
Taxi rank increase in spaces. 
Ardbeg shoreline needs fixed 
Pavilion needs fixed 
Leaving the town alone 
Not changing what already works 
Forget it! 
Scrap it! 
Consider a different route, one that will benefit folk, not just a change for changes' sake 
Instead of telling locals what they want, actually ask them 
Don't alter anything that already exists 
Don't change the road layout 
Don’t design it 
Don’t design it 
As above 
As above 
SCRAP THE PLAN: LISTEN TO THE MAJORITY. 
SCRAP THE PLAN: LISTEN TO THE MAJORITY.
Page 267

Page 268

165 | P a g e
www.connectedtp.com 
Coach space made realistic 
The narrowing of the roads 
Actually look at the community you're proposing doing this in and get the names of the streets it'll affect right. 
Check the highway code, apparently the person in town promoting this thinks that people should just park on cycle paths if they need to. 
Traffic Calming (keep speeds below 20mph in town centre) 
Listen to the locals 
Put the idea in the bin 
do not proceed with this 
do not proceed with this 
No need for a cycle lane. As a cyclist for over 30 years the roads in Bute are safe for me and my children to cycle on 
As above 
Scrap it 
It will be hell for disabled drivers. 
It will be mayhem 
Fix the prom with the money 
Install more drop kerbs to current system 
Stop the consultation 
Cycle route nearer the sea 
Pedestrians with prams . Wheelchairs pavement cars 
Repair ardbeg sea walk instead 
Repair promenade instead 
Scrap  the whole idea 
Scrap it 
Have a more family friendly promenade 
Make something for children 
Abandon & start over 
Use the areas that are already available instead of withdrawing amenities that have & needed. 
Scrap it  
As a frequent cyclist and walker I see no benefit in this proposed concept! Improve the existing road and pavement surfaces  
As a frequent cyclist and walker I see no benefit in this proposed concept! Improve the existing road and pavement surfaces 
None 
None 
Scrap it 
Scrap it
Page 268

Page 269

166 | P a g e
www.connectedtp.com 
Take away the plans all together 
We don't need this 
Don’t do this 
Don’t do this 
No changes needed 
No changes needed 
Abandon it 
Abandon it 
Lower pavements 
Parking space 
N/A 
N/A 
Bin 
In 
Improve the failing structure of the promenade 
Reconsider the parking at Albert Pier. The space for 3 coaches is totally inadequate and in the wrong position against the seawall. The old toilet building at
Albert Pier needs consideration 
Do something with the pavilion it is an eye sore 
Fix roads 
Review the process which led to this project being suggested 
Spend the time and money in some better way. There must be a better way. 
If there MUST be a cycle lane on E Princes St and Battery Place, make use of the promenade 
Instead of the cycle-lane along E Princes Street and Battery Place, formalise permitted car parking on the pavement that has already been permitted and
tolerated for decades. 
Use existing prom rather than costly changes. 
Scrap it and do something that's actually beneficial 
Scrap it and do something that's actually beneficial 
Same 
Same 
No changes 
No changes 
pavement extension at Pier, blocks route to pick up/ drop off zone when approaching from north. would be better as a raised deck (like big speed table)
reduces speed, pedestrians have more protection, traffic can still flow. 
uni directional cycleways on either side of road as opposed to bi-directional on one side of road. Proven to reduce conflicts at junctions 
Page 269

Page 270

167 | P a g e
www.connectedtp.com 
Ditch this nonsense 
Sack the clown consultant at the meeting who park illegally for starters. 
As above 
As above 
Coaches to park Albert Pier 
More room for cars to park Albert Pier to Glenburn 
As above 
As above 
The design is unnecessary 
The urination of that part of Rothesay 
Leave it as it is 
Scrap the idea, utter waste of money 
Way too narrow particularly at bottom of bishop street / roundabout for buses and emergency vehicles 
bin it 
bin it 
N/A 
N/A 
Working public toilets 
Working public toilets 
Keep well away from the exit from the ferry 
Completely waist of money other things fixed first 
Fix the roads 
Don't want it 
Don't want this change 
The narrowing of the entrance to the ferry queue area is too restrictive. 
The section including East Princes Street and Battery Place will eliminate much needed parking for both residents and visitors to the guest accommodation. 
Improving on parking 
Secure access 
Add extra trees along the seafront 
Use pavement outside Victoria Street shops to increase parking 
Wouldn't have it done 
Wouldn't have it done 
Scheme not needed 
Scheme not needed 
Page 270

Page 271

168 | P a g e
www.connectedtp.com 
Cycle route on the seafront behind Winter Gardens 
I would not block off the vehicle access to the peer in the way the design does. This will almost certainly increase congestion. when loading ferries 
I would not increase the number of pedestrian lights as opposed to crossings in the design. 
Idea 
Whole 
N/a 
N/a 
Perfectly god esplanade to walk and cycle this route 
Parking in town limited at present any further reduction would have economic impact on town 
Use promenade 
Don’t waste our tax payers money 
Take a red marker pen and cross it out 
Try to forgive the clueless consultant who dreamt up the scheme. 
Zebra crossing 
Zebra crossings 
Abandon this project 
Abandon this project 
It doesn't go ahead 
Spend the money on something actually needed 
Give the money to a town that needs it or to fund a community buyout of the discovery centre. 
Scrapping the scheme. 
Fill in the potholes 
Make wheelchair accessible kerbs 
Renovate or demolish the Albert Pier Building 
Do not build 
Save money 
Don't  do it 
Not needed 
Listen to the residents. There appears to be a lack of thought re people with disabilities and young children.  The pavements are fairly wide in parts but if you
take away a large proportion of that then other people are at a disadvantage.  If a child runs out in front of a cyclist who is cycling on the pavement who is
liable?  The roundabout being made smaller is another indication that the people who are carrying out the survey do not live in the island as the buses have to
get round it!!  Albert Pier having more space for buses means that yet again car parking is being lost and where will the cars who have to park along the road
to the Glenburn going to park.  The road here is narrow and the bus can struggle to get through. 
Page 271

Page 272

169 | P a g e
www.connectedtp.com 
You have indicated more parking on Victoria Street, however when cars come off the ferry and turn right it is already a tight corner. There is also traffic lights
and cars should not be within the zigzag lines and not near the corner of the street so where would parking be? 
Keep full width of the pavement - important as more people use wheelchairs and mobility scooters as they get older 
Remove floating bus stops -RNIB campaign highlights their dangers 
Scrap the proposals 
This is the same question as above. 
Could some car-parking be included along the stretch of road towards the Glenburn. Cars are currently parking (illegally) on the promenade. 
As above. 
Keep pavements clear for pedestrians.  People should not have to cross a cycle lane to get to Rothesay town centre. 
There is no need a cycle line for battery Place 
There is no need a cycle line for battery Place 
Probably the only area on the island NOT to have a cycle lane 
Save the Council money to spend elsewhere 
Don’t need this 
Don’t want this 
Ideally the cycle route should be for connectivity in the town and should be from the ferry to the school and factory 
something that is useful and includes mobility scooters 
Forget this absolutely ridiculous idea which nobody wants. 
Use money for something sensible that is required. 
Forget the Battery Place leg of the scheme. 
If this hare brained scheme has to proceed then it should run along the prom from the Victorian toilets to the pavilion. 
None 
None 
Don’t do it 
A refurb of Guildford Square would be better 
Spend the money upgrading the building in Rothesay town centre 
All above 
Scrap it 
Scrap it 
parking 
Money wasted 
Waste of money which could be put to much better use 
Scrap it now 
Scrap it now
Page 272

Page 273

170 | P a g e
www.connectedtp.com 
Reduce the road speed through the town to 20 mph. This will make the road even safer for cyclists. It will also make crossing the road safer for pedestrians. 
The road through Rothesay is already very safe for cyclists, The majority of cyclists who visit or  live on the island are Road cyclists who would not use the
cycle path. 
The only dangerous part of the route is at the traffic lights for the ferry terminal. It wasn't clear how that would be separated from cars. Will it be raised? Will
the cycle route have its own traffic lights? 
Don’t do it 
Don’t do it 
Demolition of Royal Hotel 
More pressing issues 
Can it be changed to the promenade. The money could be well spent repairing the promenade and creating a safe cycle and walking route. 
Spend money on existing pavements 
Spend money on existing roads 
Scrapping it. 
Scrapping it. 
Abandon the idea 
Look for genuine improvements to spend money on 
Do not proceed with the design 
Have consideration for the thoughts of the community 
Don’t reduce access to pier 
No cycle path required in town 
No cycle path required in town 
give up now 
to not proceed 
Legal compliance with crossings, bus stops, 
Scrapping the idea altogether and spending on improving our local hospital/dental services 
As above -even though the scheme is not required - minimal amendments to existing footpaths can be made to create shared cycle/footways as permitted
under the design guidance. 
Don’t want cycle lane 
Don’t want cycle lane 
Discard 
To not be considered 
Direct funding where it is needed most - this proposal is a waste of money. 
Ditto above 
Ditto above 
Page 273

Page 274

171 | P a g e
www.connectedtp.com 
Maintain historic weigh bridge outside the ferry terminal. This is meant to be a conservation area 
Maintain layout of taxi rank. It works, and it allows for more than 4 taxis during busy periods, which can immediately set off in any direction without the need
to turn round 
Fix the pavements 
20mph traffic speed limit through the busiest area 
Do not make the roundabout smaller, people already have difficulty here. 
Move the cycle route to the sea front which already runs to the Pavilion. The cycle hire station is already located in a prime position here so some
improvements to this area seems a more logical choice and avoids sending cyclists to the busiest junction on the entire island. 
Waste of money 
sign markings end of route cycles must move off the pavement 
the present scheme is creating potential danger to both cyclists and pedestrians. There needs to be barrier seperating them 
buffer needs to be bigger for car doors to avoid hitting cyclists. 
its mych to short, why would anyone want to use it 
.. 
Just because funding is available, does not mean you have to use it. 
Not required 
Look at other areas on the island 
Not needed in the area, period 
Not needed! 
Not needed 
Not applicable 
It’s not needed 
We need more parking and wider space for cars no need for a cycle lane 
Something Isle of Bute doesn't need! 
Spend money fixing the prom the existing cycle lane 
Don’t do it 
Additional parking for ferry waiting 
Spend the money on improving other existing infrastructure   
Safe walking and cycling space separated from vehicles, not on a shared roadway IE the PROMENADE 
More parking 
Do not go ahead 
As above 
Dont waste money 
The community deserves something useful 
Page 274

Page 275

172 | P a g e
www.connectedtp.com 
Don’t need cycle path 
Not required 
Skate/cycle park 
Scrap the project and fix the eyesores all over the town 
Waste of money 
Waste of time and money. 
It is definitely not required 
Scrap the design 
Would be better spending money to complete sea wall works at ardbeg 
It is a waste of money and 
Even less cycle space 
Implementation of bute residents and community concerns and scrap all of this 
Car parks 
This is a vanity project which will have a negative impact on our town 
More parking spaces 
Scrap it all together 
Redesigning this nonsense so that it doesn’t exist 
An alternative cycle path in another area. 
Utterly pointless 
Na 
Spend money on a dog warden 
To 
Stupid idea 
Plenty of room for all 
Waste of money 
The road repaired 
Common sense 
We do not want it 
More disabled parking. 
Cycle lane up the high street to the school 
Abandoned 
Cars not to park on drop curbs 
From Albert pier to Glenburn, the road needs more official car parking 
Scrap it 
Page 275

Page 276

173 | P a g e
www.connectedtp.com 
Don't go ahead with it 
Bay parking means cars reversing on to the main road, dangerous 
Instead repair any uneven or damaged sections of the pavement 
Bike shelters 
Cancelled waste of money 
Parking 
Looking after the elderly 
Motorbike parking 
as above 
Do not touch 
Don’t want it at all 
As existing 
Nil 
Parking 
More car parking in Montague street no shops reserving the space outside their shops 
Consideration of more taxi spaces 
Funding to help restore the Royal hotel. No need for a cycle lane. 
Improving existing prom/pavement 
N/A 
As above 
Tell the job centre he left voluntarily 
Parking for coached 
Disabled drop kerbs monitored by parking attendants 
Less emphasis on dedicated cycle areas 
Stop wasting money 
.. 
Use money elsewhere within our community 
not needed 
Consultation for the locals   
Waste of money 
A more useful location. 
Both locals and visitors need parking 
The answers in the survey are taken on board 
To not happen at all 
Page 276

Page 277

174 | P a g e
www.connectedtp.com 
Not beeded 
No parking on pavements 
As above 
NO pavement obstructions! 
Nothing, I don't want it 
The actual width of pavements (there are 3) and roads along Battery Place is massive. Plenty room for parking both sides of the road, a cycle lane and
walking path. Come up with a solution that resolves everything not just one or two individuals priorities. As mentioned above, all issues are already resolved
and have been for decades so someone is finding problems that don’t exist. 
Scrap it. It is not needed 
Use the funds for other better local uses 
Leave route as it is, this is not needed 
It doesn’t happen 
Ridiculous idea cyclists will not use it 
Not required 
There was a plan to widen the road up to the school and make a Cycle route- what happened to this? 
Use the 3rd putting green as a playpark, fenced off, as area for kids waiting ferry in a safe space 
All unnecessary 
Waste of money 
NO CHANGE AT ALL 
See answer 1 
Not narrowing the road 
There are already road users Highway Code  rules regarding the space cars and vehicles must give  bicycles 
Burn ithe proposal 
We do need the taxi rank 
I cycle on the road 
Not taking away walking and driving spaces in a narrow enough lanes 
Don't come up with stupid ideas 
Don’t know 
Get rid of it all together 
it's not needed 
None of it- washing money ABC just like you have on the pavilion. How about reducing prices for the Bute Highland Games in OUR PUBLIC park. 
Use the money for something else. 
More public toilets 
Sorting proper parking in town so idiots don't park on the pavement
Page 277

Page 278

175 | P a g e
www.connectedtp.com 
Free parking 
Keep pedestrians safe by rebuilding the sea wall at Ardbeg. 
Scrap it 
Ludicrous proposals 
Wase of money 
Not needed 
More seats to stop at 
Secondly, not to do it 
Not needed in Rothesay 
As above 
Waste of time get someone with a brain to stop it 
Burn it 
Pointless will make no improvement 
As above 
Keep cyclists and pedestrians well away from each other, due to the fact blind or deaf persons would be a great risk of collision and accidents 
Other ways Money should be spent on more needed things 
It is unwanted 
Please spend this money on finishing pavilion 
Same as above 
Improve the road and pavement surfaces that are already there. 
Stop wasting money 
Spending money on repairs 
Add parking / allow pavement parking on/near Battery Place to facilitate residents and Guest Houses in that area 
Repair current roads 
More traffic wardens would help traffic flow and punish council employees who park illegally in white BMWs. 
Footpath to be even and less patchy 
As above 
Do not start it 
Scrapped 
Repair the paths and roads 
None 
Reintroduce access to Esplanade for vehicles to park:as it is rarely used by pedestrians thereby reducing pressure on parking in the town centre and Battery
Place 
None
Page 278

Page 279

176 | P a g e
www.connectedtp.com 
Scrap the bike plan completely 
Not necessary 
Ample space already for walking and cycling 
Do not implement this. Cyclists do what they want and the majority will not use it they are more content cycling the wrong way on one way streets 
Taxi rank is vital and should not be altered 
No cycle lane 
Waste of money 
Reallocate the funds 
Fix the pavements instead 
Don’t do the plan 
Taking away parking 
N/A 
3 spaces for taxis is not enough 
Car parking along Battery Place. You can easily have up to 40 cars parked on the pavement you are considering for the cycle route at any given time in the
summer. 
Walking and cycling separate from cars 
Waste of money 
See above 
None 
Cancel 
Scrap it 
The area around the busy ferry terminal needs more not less parking to accommodate large coaches etc. 
Repairs to existing roads 
N/A 
Safe walking 
None 
Fix potholes 
Listen to the people who live here 
Use the money elsewhere 
Parking 
Level the pavements for users 
Getting the pavements and pot holes sorted 
2. Why do t you put in a cycle lane up towards Rothesay campus which would be beneficial to the health and safety of the students. 
Safer pedestrian crossings at ferry vehicle entrance exit.
Page 279

Page 280

177 | P a g e
www.connectedtp.com 
Not needed 
No cycle lane 
Waste of money 
Keep existing 
Invite suggestions and benefits of schemes that are less costly and obstructive to other road users( eg damaged paths nearer Port Bannatyne ) 
Scrap the whole idea 
None 
.
Resurface roads and pavements 
N/A 
As above 
resurface the rutted roads of the island 
Less virtue signalling 
Parking spaces 
Waste of Government money 
The shore railings are in need of replacement or repair 
Improved parking is needed on the seafront. Spend money on this and not this stupid project. 
Better Road Markings 
Change to existing infrasyructure not needed. 
Keep parking available 
Would rather have speed bumps along battery place along to pavilion 
Removal 
Making sure vehicles don't park where they block the route.  No-one does anything about the parking on the footway on Battery Place so how will this be any
different 
Spend money keeping a bank on the island 
Taxi rank 
See above 
More priority given to pedestrians rather than cyclists 
Ensure parking regulations are enforced 
This is a conservation area with a huge wide Victoria. promenade for cycling and walking 
Separate from traffic 
Keep pavements as is 
No cycle lane required already use pavement to cycle on. 
None
Page 280

Page 281

178 | P a g e
www.connectedtp.com 
More important things to waste money on 
It should be cancelled. 
none 
Roads fixed 
There are already broad pavements and esplanades that can be safely used just mark them up 
Scrap it 
Not needed 
Scarp 
The money would be better spent on fixing the current pavements and roads 
Make cycle lane in high street 
Increase size for taxis 
Deck chairs 
Scrap it completely 
More parking for visitors 
Ditto 
Common sense it is not required 
No bike lane 
Parking on Battery place for businesses and residents is way more important than any cycle path 
Cars have no option but to queue along Victoria Street when the ferries are busy. The proposed changes are going to make this even more of a problem, with
complete blockages along our main thoroughfare highly likely. 
Stupid 
I wouldn't put it in place 
Shared space at roundabouts 
As above 
The design should be scrapped. 
Scrap it and listen to the community 
Use existing facilities 
Invest in a play area 
Consideration for the opinions of the whole of Bute 
This is not needed 
Easier access for those with mobility issues 
Keep separate from road traffic 
Waste of money 
ZebraCrossings 
Page 281

Page 282

179 | P a g e
www.connectedtp.com 
As above 
A workshop to educate car drivers on how to safely pass cyclist's 
Nothing 
More parking 
Less cycling route 
It's a waste of resources money could be spent on other pressing matters 
As above 
The project should be scrapped 
HGV’s trying to navigate a very sharp narrow turn 
As a regular cyclist I’d say scrap it 
Boat traffic will be a nightmare 
Repair road near boat yard 
Landscaping especially at Albert pier 
Scrap it. 
Safety this would make things worse 
The majority of the island roads are suitable and safe for cycling, this will not encourage people to cycle more 
Funding go to other community needs 
Total waste of money 
Less cycle path 
As above 
Don’t do it at all not needed 
Stop it 
Short term paid parking 
Waste of money 
None 
No cyclists 
No benefit to the island 
A more intelligent route 
Use existing wide off road areas I.e. the promenade 
Stop wasting money on a useless idea 
Wider roads 
More parking 
As above
Page 282

Page 283

180 | P a g e
www.connectedtp.com 
SCRAP THE PLAN.Misplaced plans to fix something that does not require to be fixed whilst simultaneously creating problems that didn’t previously exist and
compounding those that did.  That's an emphatic 'No' from me! 
Parking monitoring and illegal parking dealt with 
Not wasting money which will affect the accessibility of taxi services and parking in town. 
Traffic calming measures (reduce motor traffic speed). 
Weeds removed from kerbs 
do not proceed with this 
Abandon the proposal 
Rubbish bins 
As above 
Scrap the project 
Actually use the money to fix the places bikes can already use ie the prom 
Vehicle parking 
Improving the appearance around the pier 
2 We do not want it! 
Improve the parking, or leave as it currently is. 
Safe for elderly drivers 
Total waste of money 
Its not required 
Bikes off road 
Parking spaces 
Abandon it 
Update/maintenance of prom for cycling to occur  
As a frequent cyclist and walker I see no benefit in this proposed concept! Improve the existing road and pavement surfaces 
None 
Waste of money 
Leave it the way it is 
Don’t do this 
No changes needed 
As above 
For designers to consult local people properly 
Leave existing system in place 
The removal of parking spaces in the proposed areas will impact business across the town 
Stopping vehicles parking on pavements. 
Page 283

Page 284

181 | P a g e
www.connectedtp.com 
Bike 
Parking at Battety Place needs fixing . Although Battery Place seaside pavement is regularly used for car parking that indicates the necessity to create proper
parking bays in this area. 
Fix the roads 
Common sense. 
Improve/ extend waiting area for ferry 
Fix the railings along Ardbeg road 
Town parking 
No changes 
cycle way must be different height to main carriageway and pavement. Essentially 3 levels. when the pavement and cycleway are same level, it creates
conflicts between pedestrians and cyclists 
It causes undue problems to buses and emergency vehicles managing the proposed changes. 
I would like it not to cut off the pier for ferry traffic 
Having the coaches park on the Albert pier and rest of proposed area for cars. 
Safety for pedestrians 
As above 
The promenade needs repaired 
Proper maintenance of existing prom for walking 
The design should be rejected 
Good walking pavements 
Has there been a Health / safety done 
Fix the islands roads , so many potholes potentially dangerous to cyclists 
bin it 
N/A 
Working public toilets 
Cleaning side of pavements as full of weeds 
None 
Provision for parking between Albert Pier and Glenburn Road. 
Bollards 
Plenty of crossing places for pedestrians 
Roads need fixed first 
Not needed 
No comment 
Unwanted
Page 284

Page 285

182 | P a g e
www.connectedtp.com 
N/a 
Waste of money that could be gainfully in other parts of the island 
Parking 
Abandon the plan 
More road space for cyclists who will not use the cycle path. They will use the road. 
The existing infrastructure is poorly maintained so what hope do we have that they will maintain the proposed scheme. 
More parking 
None - scrap it is it not needed 
Abandon this project 
It doesn't happen 
Small quiet seaside towns don't need cycle lanes. 
.More drop kerbs for wheelchairs 
Scrapped 
Fix pavement 
Same as above 
keep the full width of the pavement for pedestrians, especially those using wheelchairs, mobility scooters or even prams 
Cycle path not in front of bus stop 
N/a 
The extra parking spaces at Albert Pier are welcome, but are these intended specifically for ferry users (which is important) or will they be taken by local
residents? How will the scheme ensure that parking for ferry passengers is prioritised? 
Open up the promenade so vehicles going for the ferry can park instead of waiting on Victoria street 
Safer pavements. 
N/A 
Do not go ahead 
We don’t need it 
Opportunity to repurpose the sea front promenade and make it a real facility for the town 
If you cannot even get the name of Victoria Street correct then there is no hope for us! 
Don’t block the access of the cars entering the pier. 
It 
Don’t do it 
Spend the money on other things Rothesay needs 
More parking access to shop for elderly but not yet disabled 
Don’t need cycle path waste of money 
sort parking out with bays
Page 285

Page 286

183 | P a g e
www.connectedtp.com 
It’s not needed 
See above 
Scrap it now 
Separate, completely cyclists from pedestrians 
Better access to the ferry terminal for drop off and pick up purposes - the current plan looks to severely restrict existing vehicular access in this regard 
Ridiculous idea 
Crumbling buildings 
People going on a bus will have to cross over the cycling lanes. On the mainland this has caused many accidents. 
Bus parking 
Pot holes fixed 
Evidence that it will be of any benefit at all 
Less disruption 
Make use of the esplanade 
No cycle path required in town 
this will cause disruption beyond it’s so called benefits 
Proper legal compliance with bus stops, crossings, entrances and egress’s 
The survey data provided in slide 3 provides no context to allow the reader to make an informed judgement. Is it parking surveys? bicycle use surveys? From
local knowledge, it would be expected that extremely low numbers of bicycle users along the proposed routes would be identified, which, when considered in
context of the potential CAPEX for the scheme will indicate little value in the scheme. 
Don’t want cycle lane 
Not necessary 
There are more pressing needs on the island for development and funding. 
Mend paths 
More residential car parking spaces for Battery Place 
Maintain layout of taxi rank. It works, and it allows for more than 4 taxis during busy periods, which can immediately set off in any direction without the need
to turn round 
Waste of money 
Delay the scheme until route from ferry to school have been constructed 
route up to the school to make it useful instead 
No Cycling 
This idea restricts other users accessing services in the town and  infact access to the island is hindered 
no alteration to existing roads and pavement
Not needed! 
Not needed
Page 286

Page 287

184 | P a g e
www.connectedtp.com 
Not applicable 
It’s not needed 
Spruce up the buildings spend the money on that maybe make a play area for kids at the putting green anything but a deranged cycle lane that nobody wants 
Waste of money! 
Scrap the whole idea 
There are more important things needing attention 
This is just a vanity project put together without the consultation of the community 
No cycle paths 
Do not go ahead 
As above 
Nothing 
Why not use the money for a safe school crossing up at the medows/ hospital 
Same 
Not suitablw 
Keep wide promenades they’re safer. 
Total rubbish 
Utterly ridiculous. 
Not needed.....not applicable 
Scrap the design 
Build a playpark on putting green next to ferry 
Is totally unnecessary 
Zero cycle lanes 
Implementation of bute residents and community opi unions re scraping whole project 
Child safe areas 
No cyle track 
Implementing something more useful, like more parking around the town 
An alternative cycle path in another area. 
Not needed 
Na 
More parking places for cars on shore side at battery place 
Happen 
Stupid idea 
Why take it to the pavilion, is there a plan to get this finished? 
Waste of money 
Page 287

Page 288

185 | P a g e
www.connectedtp.com 
The Albert pier area cleaned up 
Don’t want 
Camper vans will park in the coach parking if they're moved off the pavement at Battery Place. 
Abandoned 
Pot holes to be addressed so people on mobility scooters can drive on pavement rather than road 
Help the small shops along the front 
Scrap it 
Make the road wider 
Increase number of kerb drops for disabled users 
Accessible water and air pump stations 
Cancelled waste of money 
Getting the derelict buildings up to use for the community 
Any parking 
as above again, hope you are getting the message! 
Do other work first for the community 
Not needed and a waste of money 
None 
Nil 
Parking 
Shuttle bus from a car park to Pier for commuters who park along Victoria street  go on boat and don’t come back until night time 
Funding for repairing the sea wall and pavements along by the sailing club towards Port Bannatyne. 
No effect to existing parking 
N/A 
As above 
And scrap the idea 
Parking for taxis 
Childrens corner rebuilt 
No loss of existing roadways 
Not needed 
.. 
Do not proceed with this project 
not needed 
Transparency regarding the responses to the questions the community is asking   
Money could be spent on other areas
Page 288

Page 289

186 | P a g e
www.connectedtp.com 
More consideration towards a wider demographic of Bute’s population. 
I believe a cycle route will put tourists off visiting 
Not happen at all 
Not needed 
Priority for pedestrians 
As above 
Speed limit signs on road. 
Nothing, I don't want it 
Resolve Rothesays actual problems. The railings that the council never fix properly, the pavements damaged by storm never fixed properly, a building upgrade
program to the front of Rothesay to improve image and encourage tourism. This plan discourages tourism in many ways by making parking a nightmare.
There are very few side streets on Battery Place so nowhere for people to park. This is hotels, B&B’s, cafes, residents who may be retained fire fighters for all
the designers know. They need access to their vehicles. 
Scrap it. The vast majority of the local community does not want this 
Support routes for school children cycling 
Leave route as it is, this is not needed 
Consultant learns to park in a proper parking space 
Sort out the route up to the school - there is room to widen in places there and it it’s dangerous for cyclists. Walkers and wheelers can use the promenade on
the waterfront. 
Do not put in a cycle lane. This is a total waste of money when you could be spending this money on Thomson court day centre or keeping the discovery
centre open 
All unnecessary 
Give community funding to make their own changes to benefit community 
No change at all 
See answer 2 
No scheme needed 
The alteration to the front of Rothesay for a minority of users 
Lot of crap not needed 
Put in Pedestrian Crossings for the kids coming down from the joint campus 
Just get the roads fixed 
More coach spaces for tourists so they stop using Guildford square 
Preposterous idea 
Don’t know 
Spend the money on repairing the pathways and roads we already have 
it's not needed 
Page 289

Page 290

187 | P a g e
www.connectedtp.com 
None of it- washing money ABC just like you have on the pavilion. How about reducing prices for the Bute Highland Games in OUR PUBLIC park. 
Less ignorance towards the islanders who LIVE HERE and listen to us when we say we do not want this. 
Fix pot holes 
Fix the potholes! 
No need for it at all 
We already have a promenade. A cycle lane could be introduced there. 
Scrap it 
Waste of money 
Going to cause a headache 
Are you getting the hint yet? 
Thirdly, cancel the project 
Not enough traffic on island for cycle route 
As above 
Consultants to pay back there fee 
Get rid of it 
Just coz money ring-fence for job doesn't mean its a good idea 
As above 
Better car parking bays within the town, as there is lack of parking and bus stops are getting blocked by parked cars. 
Rip it up 
It is unnecessary 
Please spend this money on royal hotel 
Same as above 
Improve local local buildings/infrastructure with the budget for this instead. 
Don't wreck our town 
More of what locals actually want 
Taxi Rank allows only for 4 vehicles, but there are consistently more taxis using the rank. This is important to have as many available as possible when the
ferry comes to port in order to prevent people from being kept waiting, especially when raining. There is nowhere for the 5th taxi to park. 
We don't want it 
Rothesay is already as safe as it can be for cyclists and the current routes, while in need of urgent repair, already provide the community with what it needs. 
Better lighting 
As above 
Waste of money 
More parking needed 
None,  make it disappear 
Page 290

Page 291

188 | P a g e
www.connectedtp.com 
Resurface roads in the town centre, particularly Battery Place to make them more cycle friendly 
None 
Spend money on essentials as opposed to hairbrain ideas. 
Waste of funds that would be better spent elsewhere. 
Community don't want this change 
The extra pedestrian crossings are not required and will only increase congestion 
Waste of money 
We don’t need a cycle lane 
Go away 
Use the money wisely this is not needed 
Leave the place as is 
Money could be better used elsewhere on the island 
NA 
As little development as possible. 
Would be better off repairing the roads and pavements so people can walk without tripping.   
See above 
None 
Cancel 
Scrap it 
Removing parking on the Albert Pier to Glenburn stretch will cause problems 
Repairs to existing benches & shelters 
N/A 
Space to push a pram or wheelchair 
None 
In force parking rules ie double yellows 
Cyclists local and who come here have had no serious accidents 
Don’t do it 
Parking 
Build housing for residents 
More lower kerb. For chairs 
3. 1 and 2 
.
Not needed 
No cycle lane
Page 291

Page 292

189 | P a g e
www.connectedtp.com 
Spend money elsewhere 
Keep existing 
Use of existing roadway to form painted marked cycle lane . 
Make more parking for cars and disabled people 
None 
N/A 
As above 
Try going out with a cyclist and see the actual issues 
Improvement of the existing tarmac surface at the promenade 
No changes needed to existing roads 
The grass bank and borders are in need of tidying up 
Listen to the views of the public and don’t force this on us. 
Forget the Rothesay Cycle Lane 
The routd is fine as it is 
Tearing up the plans 
N/a 
Community objection 
Less cruise ships more local visitors 
See above 
Increase parking around the pavilion 
It is totally unnecessary, whole community is against it 
Wide enough for pedestrians and cyclists 
Leave our town alone 
Town doesn’t need this change to accommodate cycling and walking. 
None 
This is waste of our money 
Stop making changes for the sake of it. 
none 
Pavements fixes 
More parkibg 
Scrap it 
Not needed 
Scrap 
Upgrade the lighting and walkways we have currently 
Page 292

Page 293

190 | P a g e
www.connectedtp.com 
Not to encroach ferry terminal parking 
Buses 
Scrap it completely 
More parking for ahoppers 
Ditto 
For money to be used elsewhere eg to make the promenade safe before it collapses 
No bike lane 
Parking along battery place is already difficult. This proposal will make that worse. 
Don't waste the money on it 
Ker separation from carriageway 
As above 
The design should be scrapped. 
Scrap it and listen to the community 
Fix sea wall 
Or just don’t bother with this at all 
This is a waste of money 
No silly cones to separate cycle and road traffic 
As above 
Expand to ettrick bay via Ardbeg 
Nothing 
More parking 
It's a waste of resources money could be spent on other pressing matters 
As above 
Please stop this waste of valuable resources 
Don’t take away any parking spaces. Parking is already very limited 
As an experienced cyclist who has cycled all over the world, I say scrap this totally 
Finish pavilion 
Scrap it. 
Safety can’t see how this would make anyone safer 
Parking will be an issue for all the residents along this route 
Funding go to other community needs 
More parking 
As above 
Don’t do it at all not needed
Page 293

Page 294

191 | P a g e
www.connectedtp.com 
Stop it 
Large vehicle parking ( less carbon footprint print) 
Not wanted 
None 
Not existing 
Waste of money, that could be better spent elsewhere 
Joined up thinking. Just because it looked good on paper or worked in another area, does not mean it'll work here 
Stop wasting money on a useless idea 
As above 
SCRAP THE PLAN.Misplaced plans to fix something that does not require to be fixed whilst simultaneously creating problems that didn’t previously exist and
compounding those that did.  That's an emphatic 'No' from me! 
Road markings clearer 
Listening to the community who are stating that money should be spent on other things that are needed far more than a cycle route which we'll only serve a
very small number of cyclists. 
A repaint of railings 
do not proceed with this 
As above 
Makes the road more dangerous for drivers and pedestrians 
And more vehicle parking 
Improving the appearance 
3 Please go away and leave our main street as it is! 
Take account of the demographics 
Total waste of money 
Safe pedestrian and cycles to get to Montague street 
Parking spaces 
Abandon it 
More consideration for where residents park. Which is area of proposed cycle path.  
As a frequent cyclist and walker I see no benefit in this proposed concept! Improve the existing road and pavement surfaces 
None 
Waste of time 
More car parks 
Don’t do this 
No changes needed 
As above
Page 294

Page 295

192 | P a g e
www.connectedtp.com 
To LISTEN to the views of locals 
Leave existing roads and pavements 
The disruption to the community in bringing these changes in will be a net negative to the community in the immediate near future. 
Lane 
Improve the weakness issues at the Promenade. Why not take the route in this direction and stabilise the reported weakness on the main promenade. 
Make better parking areas with in Rothesay instead of taking it awau 
Clear thinking. 
Fix the foot path at ettrickdale 
Traffic lights at Gallowgate 
No changes 
The changes to the vehicle queue at Calmac ferry is a nonsense and will cause chaos. 
I would like it to not take away space from the road 
Make all wider pavements small for cycle lane from Pavilion to pier and narrow pavement at taxi rank.. 
Safety for cyclists AND motorists. 
As above 
The sea wall at Ardbeg needs repaired 
Stop wasting money on unwanted projects and focus on improving the existing building stock 
The design would ruin a the town 
Mothball it waste of money 
The bike hire closed there was so little trade 
bin it 
N/A 
Working public toilets 
Paint Building's all over the Island 
None 
Adequate parking 
20mph speed limit 
Waste of money 
Not needed 
No comment 
Unneeded 
N/a 
Why is this project being railroaded onto the locals file it away 
Listen to the community 
Page 295

Page 296

193 | P a g e
www.connectedtp.com 
Scrap this scheme and stop over-paying consultants. 
We need safe places for children to cycle and we already have a prom just maintain it !! 
More parking 
None - scrap it is it not needed 
Abandon this project 
Scrap the idea 
Who asked for this?  Who’s needs dors it address? 
Stop people cycling on pavements 
Waste of money 
Fix seawall 
Same as above 
Do not impose floating pavements in the area - see RNIB campaign for why they are so dangerous to pedestrians 
Sight and hearing impaired 
N/a 
More parking made available for all drivers whether it be cars or coaches. 
N/A 
Scrap the project 
Not needed 
Not to have cycle lanes in this manner 
I would in-ring fence the money and use it to repair the sea walls in Ardbeg Road. 
Don’t take away any of the pavement running along beside the road. 
Alone 
Don’t do it 
Do something about the Royal Hotel instead 
Allow other uses when the cyclists only use it on high days and jolidays 
None we don’t need a cycle path 
cycling on the roads are dangerous a cycle lane is a good idea but how will it work 
It’s a waste of money 
See above 
Leave it as it is 
Ensure that cyclists do not continue along the pavement at each end of the cycle routeroute 
Ridiculous idea 
Overall state of Town 
Elderly and less able bodied will have difficulty getting on a bus and keeping out of the way of oncoming cyclist therefor this will  be dangerous for them.
Page 296

Page 297

194 | P a g e
www.connectedtp.com 
Loading bays 
Pavements repaired 
Acknowledgement that it will be detrimental 
More parking 
No cycle path required in town 
do not change existing situation 
An official meeting with and Argyll and Bute concil representatives present 
Don’t want cycle lane 
Will not benefit the town 
The railings and pavements all need attention. 
Sort out the places that a person with a pram or mobility problems that can get across the roads without all stepping up curbs 
More car parking facilities on Battery Place 
Maintain historic weigh bridge outside the ferry terminal. This is meant to be a conservation area 
Present the route can only be accessed by road - it ques to no where useful and is a waste of money and funding 
Ensure bikes leave the footpath at the end of cycle route 
Hinders flow of traffic access to pier 
Page 297

Page 298

This page is intentionally left blank

Page 299

Rothesay Pavilion to Albert Pier Active Travel Project 
Stage 1 & 2, Options Feasibility Report
DATE:  February 2025  REF:  501053 VERSION:  FINAL v3
Page 299

Page 300

MARK RINKUS                                   
Managing Director                                   
Mark.rinkus@connectedtp.com                                         
Contents
1 OUTLINE BUSINESS CASE ................................................................................... 1
2 OPTIONS DEVELOPMENT AND APPRAISAL ....................................................... 25
3 DEVELOPING THE CONCEPT ............................................................................. 41
4 DESIGN PROCESS QUALITY AND INNOVATION ............................................... 57
5 PROJECT DELIVERABILITY AND DESIGN COLLABORATION ............................ 64
APPENDIX A – EXTENT OF APPROXIMATE COUNCIL OWNERSHIP ........................... 66
APPENDIX B – SOCIAL AND EQUALITY IMPACT ASSESSMENT (SEQIA) ................... 67
Page 300

Page 301

1 | P a g e
www.connectedtp.com 
1 OUTLINE BUSINESS CASE
1.1 Introduction and Study Overview
The Rothesay community consists of around 4,3201 people with the town
providing the service centre for the Isle of Bute. The island is located on the coast
of the Firth of Clyde. The A844 Victoria Street passes through the centre of
Rothesay and serves as the Main Street providing access to essential amenities
and education facilities and will connect to neighbouring settlements via the B878
and B881 roads that connect Rothesay to the wider Isle of Bute.
The proposed study route spans between the Rothesay Pavilion and the Albert
Pier along the A844 Victoria Street, a distance of c.965m.  The route can be
considered in two sections split at the ferry terminal and high street junction.
Each section reflects different challenges relating to land use and corridor space.  
This Outline Business Case (OBC) seeks to provide a ‘snapshot’ of the options to
improve walking and cycling within the study extent, setting out a baseline from
which future monitoring and evaluation can be referenced.
This report should be considered in conjunction with the Stage 1 Community
Feedback and Monitoring and Evaluation Report; reported separately. 
1 2022 Census Supporting Information | National Records of Scotland (15 August
2021). "Appendix 2: Population and households on Scotland's Inhabited
Islands" (PDF). Statistical Bulletin: 2022 Census: First Results on Population and
1.2 Recent Study History
Options to improve the town facilities have been considered for a number of
years.  These include:
• In 2010, The Highlands and Islands Regional Transportation Partnership
(HITRANS) commissioned an audit of existing active travel infrastructure
in Rothesay, with the aim of recommending priority areas for future
investment. The actions focused on four key priorities for encouraging
active travel: Priority 1: Clear and simple sign for Rothesay (both
signposting and mapping) Priority 2: Introduction of contra-flow cycling
on Rothesay's one-way streets Priority 3: Montague Street - Bridge Street
town centre shared space system Priority 4: School campus to town
centre (High Street).
• In 2015-16 Remaking Rothesay Charette was produced in response to
the growing concern about population decline on the island. A series of
community and stakeholder engagement events were held in 2015,
gathering ideas and opinions from businesses, community groups, school
pupils, and members of the public. The key outs of the charette are:
-  Redesign of circulation and way finding between harbour and town;
Household Estimates for Scotland Release 1C (Part Two) (PDF) (Report).
SG/2013/126. Retrieved 14 August 2021.https://surf.scot/wp-
content/uploads/2023/04/Remaking-Rothesay-Charrette-Report-1.pdf     
Page 301

Page 302

2 | P a g e
www.connectedtp.com 
- Detailed reconfiguration of movement and parking across the wider
town;
- Accessibility awareness and improvements;
- Connected transport and active travel.
- The Charette also identified plans for improving the town including a
‘Low Speed Environment’ and also imposing an idea of different
‘Series of civic spaces and connecting routes’.
• In 2013 Fyne Futures, the Sustainability subsidiary of Fyne Homes, and
partners in the Toward Zero Carbon Bute group, sought to undertake a
review, identification and implementation of actions to enable active
travel on Bute. In Rothesay, the work focused on progressing key actions
identified in the Rothesay Active Travel Audit, and included: 
-1. The development of a cycle signposting strategy for the island,
including routes to Rothesay, although no strategy was proposed. 
-2. The design of a walking and cycling map of the island, including
Rothesay, showing key active travel routes, destinations and transport
modes. 
-3. The review and phasing of developing the esplanade/promenade as
an active travel route between Port Bannatyne and Ascog Bay. The
implementation of the route was split into three phases, with Rothesay
town centre (from the Pavilion to East Prince Street) included in phase 2. 
• In 2016 Argyll and Bute Council commissioned a review of pedestrian and
cycling movements in the harbour and promenade with the aim of
identifying improvements to the poor connectivity in the area. The
present feasibility study builds on that review and addresses the issues,
suggestions and comments raised during the public consultations as part
of the Remaking Rothesay Charette.
• During 2018 the town was examined as part of The Rothesay Town
Initiative investigating how the town is being used and accessed.  The
resulting spatial strategy identified several improvement options.  
• Argyll and Bute Council (ABC) have been progressing an active travel
route within the community since 2017.  This study focuses on the route
between the Joint Campus to the north of the town towards the ferry
terminal junction via High Street.  Through a process supporting
community engagement, the project has concluded detailed design
(Sustrans PfE stage 3) with funding now being sought to support the
route’s technical design prior to future construction.
• Caledonian MacBrayne (CalMac) as the ferry operator commissioned a
safety assessment during 2019. The study examined the layout, access
and operation of the port and made recommendations for safety related
improvements. 
Page 302

Page 303

3 | P a g e
www.connectedtp.com 
1.3 Project Alignment with National and Local Strategy / Policy 
As an active travel enabler2, this project seeks to support the connection of 20-
minute neighbourhoods3, linking people and places whilst enabling the movement
of people of all ages and abilities.  The project will seek to reduce car
dependency, reducing the need for car based short-journey trips whilst enabling
the benefits of the healthier options of walking and cycling in undertaking
everyday journeys by sustainable travel modes.
The project seeks to directly contribute to safety and resilience objectives through
the creation of a safe walking and cycling space.
The project is therefore directly and indirectly aligned with national, regional and
local policy and aligned with the strategic objectives of Argyll and Bute Council
(ABC).  
The following strategies and policies are considered relevant to this study:
• The Scottish Government’s National Performance Framework
• Scottish Government Infrastructure Investment Plan
• Active Scotland Outcomes
• Physical Activity Implementation Plan – A More Active Scotland
• Scottish Government Creating Places
• Preventing Obesity in Scotland
• The National Walking Strategy 
2 A project which enables travel behaviour change.
• The Cycling Action Plan for Scotland (CAPS)
• The Climate Change Plan
• The Road Safety Framework; and
• The National Transport Strategy (NTS)
A figure summarising the Scottish government's journey towards reducing car
dependency for single occupancy trips is presented below. 
3 https://www.sustrans.org.uk/our-blog/get-active/2020/in-your-community/what-is-a-20-minute-
neighbourhood
The National Picture
Page 303

Page 304

4 | P a g e
www.connectedtp.com 
1.4 Population and Demographic Assessment
Rothesay currently has a population of 4,3204 residents based on the 2022
census. The population shows an overall small decline since 2001, summarised in
the following table.
Year Population
2001 5,140
2011 4,637
2022 4,320
The population is evenly split between males and females and weighted towards
ages 60 – 69 years old and upwards.   
4 2022 Census Supporting Information | National Records of Scotland (15 August
2021). "Appendix 2: Population and households on Scotland's Inhabited
Islands" (PDF). Statistical Bulletin: 2022 Census: First Results on Population and 
1.5 SIMD Assessment
To understand Rothesay's social challenges, the Scottish Index of Multiple
Deprivation (SIMD) area statistics for 2022 were examined.  The results indicate
that Rothesay is ranked low overall at 558 out of 6,976 places, all social indexes
receiving a low score of between 1-3 out of 10.  
Thirteen out of the ABC area’s 125 data zones were identified as being amongst
the 20% most overall deprived data zones in Scotland.  These thirteen data zones
are located in the towns of Rothesay, Dunoon, Campbeltown, Helensburgh and
Oban. 
All of these data zones are located in the area’s towns, however, deprivation can,
and does, occur elsewhere.  Because the SIMD identifies concentrations of
deprivation, smaller pockets and instances of individual deprivation are not picked
up by the index.
The town has a low level of car ownership with 41% not having access to a car or
van when compared with wider Scotland (31%).  The low ownership presents
opportunities through the study scope to positively influence travel mode choice
through improvements to infrastructure to support everyday travel by walk and
cycle modes. Limited access to a private car will limit accessibility to services and
Household Estimates for Scotland Release 1C (Part Two) (PDF) (Report).
SG/2013/126. Retrieved 14 August 2021.
Page 304

Page 305

5 | P a g e
www.connectedtp.com 
opportunity by restricting the ability to move around with evidence showing that
residents in smaller communities are typically disadvantaged by being more
reliant on car ownership and exposed to greater costs of accessing goods and
services. 
Most people living within Rothesay commute to work within the town with the
largest movement outside the town being north east to the adjacent settlement
of Craigmore.  Residents also commute off-island with reliance on the ferry
service. Travel within the ward is likely but cannot be disaggregated from the
reported census data.
The islands primary employment industries are agricultural and tourism with the
ferry services providing a critical lifeline to the movement of goods and services.
The town suffers from comparably high levels of unemployment. 
Rothesay SIMD low ranking
Census 2011 Rothesay travel to work
Destination
Page 305

Page 306

6 | P a g e
www.connectedtp.com 
1.6 Rural Deprivation
In recent years there has been a greater understanding of the impacts of
transport poverty; where people lack access to services or work and the
contributions that a lack of affordable transport options creates.    
It is important to consider the aspect of island and rural inequalities, which
creates challenges to living that are different from communities within larger
urban areas5. In reviewing employment in rural areas, the SRUC report highlights
a significantly larger percentage of those in part-time or smaller contract jobs,
often with lower hourly rates or salaries than counterparts in urban population
centres. Many rural areas have become increasingly reliant on the tourism
industry, as a result, many jobs are seasonal and in demand, reducing the overall
hours or contracts available over the year. 
Fuel Poverty Living outside larger urban areas is likely to increase the costs of
goods overall – primarily due to the cost of the supply chain network required.
This can be seen in the fuel cost with a predominant market of independent
providers, unable to offer the prices of larger national outlets. This issue raises a
secondary cost to residents, with island /  rural communities relying more on
private transport, and often having to travel further for services. Ultimately, for
residents of communities such as those in Bute and Islay, more fuel is required to
travel for day-to-day work and leisure. 
5 The Scottish Rural Policy Centre (SRUC) published a report entitled ‘Rural
Scotland in Focus’
A report on the Minimum Income Standard for Remote Rural Scotland and
research on the subject highlights that the cost of food and consumable goods
are between 10-50% higher in rural areas, whilst clothing and household goods
are between 30-50% higher. These estimates do not consider the impact of living
in the most remote locations where the costs associated with the movement of
goods and services can be even more disproportionate.
The cycling organisation Sustrans through their research has identified three key
areas which can assist in addressing transport poverty.  These are:
• People-centred transport planning;
• Provision of quality accessible, frequent and affordable public transport
service; and
• Development of a transport network that supports the movement of
people to places irrespective of user’s social status. 
Whilst these options may not address the inequalities of island / local transport
challenges; improving accessibility and access to goods and services, through
sustainable travel modes, will provide the community with improved travel
choices better aligned with the National Transport Policy.  In time, these
measures have the potential to reduce car dependency for short journey trips
whilst contributing to people’s health and well-being through increasing daily
physical activity.  The reprioritisation of our streets to a more equitable
Page 306

Page 307

7 | P a g e
www.connectedtp.com 
distribution of limited space, combined with the reallocation of road space to
support sustainable travel, landscaping, ecological and placemaking will improve
the social and environmental experience of the area.  Transport and access within
the community are a core consideration in helping to mitigate some of the
challenges of rural social deprivation. 
1.7 Understanding Place
Rothesay as a Town
Rothesay is the principal town located on the east side of the Isle of Bute. The
town can be reached by ferry from Wemyss Bay, which offers an onward rail link
to Glasgow.
Rothesay is a Victorian seaside resort and the main town, with a traditional
appearance and Victorian heritage including a Victorian frontage around Rothesay
Bay. Dominating the shoreline amongst the esplanade front green is the
refurbished Isle of Bute Discovery Centre, a unique 1920s circular structure of
cast iron and glass, the centre incorporates a cinema, theatre and many
interactive displays providing tourist information.
The community includes Rothesay Castle and its dungeons. Just behind it is
located Bute Museum.
To the north of Rothesay, through the small community of Port Bannatyne,
lies Ettrick Bay, Bute’s most accessible beach, which is attractive destination for
able swimmers.
Rothesay supports access to several everyday community services:
• Coop supermarket
• Rothesay Academy (Joint Campus)
• Rothesay High Street, supplying most everyday service essentials;
• St Andrews and Rothesay Primary Schools (Joint Campus);
• Rothesay Leisure centre;
• Esplanade Gardens including putting greens and palm trees; 
• Rothesay Castle, Victorian Toilets and cabbie’s shelter;
• Bute Museum;
• Discovery Centre (tourist information) and Cinema; and
• Churches, supporting all aspects of community activity. 
Due to the town’s many surviving examples of Victorian design and styling the
town is a conservation area.
Rothesay Esplanade
Rothesay is famous for its pier and promenade which have been built on
reclaimed land. The original shoreline being located about 200m further inland,
just in front of Rothesay Castle.
The esplanade spans from the ferry terminal east along the coast. The esplanade
is formed as a solid surfaced shared use footway which is as wide as c.14m. The
Page 307

Page 308

8 | P a g e
www.connectedtp.com 
route is formed in two parts consisting of a wider boulevard located between the
front green and the sea and spanning from the ferry terminal (Victorian toilets) to
around St Johns Place.  From here the esplanade is formed adjacent to the A844
Victoria Street and continues north along the coast essentially becoming a
footway.  The esplanade at this location is considerably narrower at just over 2m
in width. The esplanade provides a number of functions incorporating an inner
and outer coastal defence wall providing protection to the front green from the
Scottish weather and tidal surges. From the esplanade, access can be gained to
Rothesay’s beaches via stairs.  The esplanade is designed in keeping with the
Victorian style incorporating ornate ironwork fences and is a car free route.
Albert Pier
Albert Pier forms the western boundary of the study area located to the west of
the ferry terminal. This section of the study area is shorter than the esplanade at
only 230m in length.  The route is however complex incorporating a narrow route
corridor between the harbour and buildings located on the inland side of Victoria
Street.  With the extent of Albert Pier there are a number of land uses including:
• A 20-vehicle taxi rank formed as a taxi layby on the coastal side of Victoria
Street; 
• A bus stance supporting access to island bus services. The stance is located
on both sides of Victoria Street at the harbour;
• Access to Bishop Street via a mini roundabout;
• Access to Albert Pier car park providing c.20 vehicle spaces;
• Access to a range of frontage business and residential flats.
Limited land space at Albert Pier combined with seasonal high on-street parking
demand will likely be key route design considerations. 
Rothesay Ferry Terminal
The ferry terminal is owned by Argyll and Bute Council and operated by
Caledonian MacBrayne. A commercial ferry port, the port is a lifeline to the island
supporting access for goods and services. The terminal is a 30-minute journey
from the mainland at Wemyss Bay. 
The terminal consists of a terminal building with waiting room, toilets and ticket
terminal.  Access to the terminal from the town is via a pedestrian walkway
adjacent to a covered harbour stance that historically provided shelter to horse
drawn cabs and buses. A relatively new swing bridge provides access across the
inner harbour mouth to the terminal building.
Vehicular access to the terminal is via the Victoria Street / High Street junction
(the principal junction in Rothesay), the terminal is formed as a fourth arm to the
junction configured to provide a 3m wide vehicular drop-off lane supporting
access direct to the terminal building.  Adjacent to this is 6 stacking lanes (1 HGV
and 5 car) for traffic waiting to board the ferry and a single 2.5m traffic lane used
by all traffic existing the ferry.
Traffic movements are supervised by marshals who provide drivers with the
necessary instructions.
Page 308

Page 309

9 | P a g e
www.connectedtp.com 
The Victoria Street / High Street / Ferry junction is an unusual layout
incorporating non-standard road geometry with some very wide sections of
carriageway. The junction is partially signalised, providing priority to egressing
traffic from the ferry utilising loop detectors in the carriageway.
The signals do not include any support for pedestrian or cyclist movements.
Pedestrians wishing to cross the ferry arm are required to traverse 30m of
carriageway unsupported.  Similarly, crossing of Victoria Street at this location
could also be a challenge as there are no pedestrian signals provided and the
road often has cars parked along both sides of the carriageway.  Overall,
measures to support access and mobility by those less able have not been
included within the junction design.
Notwithstanding, the separate Ferry Terminal to Joint Campus active travel route
did identify a number of smaller scale junction improvements designed to
improve pedestrian and cyclist mobility. The proposed changes are shown in the
figure opposite.   
High Street / Ferry Terminal Proposed Changes
Page 309

Page 310

10 | P a g e
www.connectedtp.com 
Victoria Street
Victoria Street is located to the east of the ferry terminal. This section of the
study area is longer than Albert Pier at around 640m in length.  The route leads
on from Albert Pier at the High Street junction supporting access through the
town to the west. The route is wide with a carriageway of around 18m flanked by
two footways, the coastal side being c.3m and the inland side being 2m.  The
widths of the footways vary along the route.  Within the study extent, Victoria
Street is fronted by a number of businesses including accommodation services. 
The street supports access to the main shopping area on Montague Street located
behind Victoria Road.  Access to the Chapelhill Car Park can also be gained from
Victoria Street noting that the street is often well used for parking with vehicles
parked along both sides of the carriageway.  A number of bus-stops are located
along the route.  A few pedestrian crossing points have been formed using
cobbled ramps to manage vehicular speeds and carriageway buildouts to reduce
pedestrian crossing widths and improve visibility between parked vehicles.
Rothesay Pavilion
Rothesay Pavilion is an internationally recognised building of architectural and
cultural significance.  The building is A listed and is currently being redeveloped
with the intention of becoming a social hub and economic multiplier for the
community, as well as a catalyst for the creative and digital industries in keeping
with its heritage and a magnet for tourists, particularly architectural industrial
design enthusiasts and fans of popular music, dance and entertainment.
Upon completion and once open to the public, the Pavilion is anticipated to
become a key trip attractor / generator and will increase trips from the town
centre.
The Pavilion is also anticipated to include a frontage placemaking design which
will ideally ‘tie-in’ to this project. 
2016 Pavilion Concept showing Placemaking
Page 310

Page 311

11 | P a g e
www.connectedtp.com 
1.8 Infrastructure Condition
The esplanade is predominately surfaced using a bound surface asphalt between
the sea defence walls. The surface is in generally good condition. Lighting is
provided via Victorian style lighting columns installed on the inland side.
Victoria Street is also in generally good surface condition with both the
carriageway and footways showing only a few signs of failure.  Victoria Street is
lit from the lighting columns on the seaward side and from lighting installed on
the building fronts.
Some dropped kerbs have been installed along the length of Victoria Street
although there are few locations where tactile paving has been provided.
The road includes a number of footways buildouts helps pedestrians cross the
wide road. Sections of cobbled inserts have been used to manage vehicle speeds.
Whilst the surface condition is generally in good condition, the streetscape is a
mish-mash of changes.  Double rows of parked cars and limited formal crossing
opportunities will create challenges for pedestrians seeking to cross the road.
The adjacent front green provides a key recreational space for the town and a
welcoming green space to visitors.  The greens include putting greens, benches
and bins with the benches and bins supporting pedestrians walking the length of
the esplanade.
Overall, the infrastructure within the study area is in generally good condition.  
Rothesay’s Road Surface is in Comparably Good Condition
Page 311

Page 312

12 | P a g e
www.connectedtp.com 
1.9 Tourism, Visitors and Local Economy
Rothesay High Street provides a core function as the heart of the Rothesay
community and provides a service centre to the wider region.
The High Street consist of a wide range of retail and commercial uses supporting
everyday services. Like all towns, Rothesay businesses face a challenging
economic headwind having suffered through the COVID-19 pandemic with the
cost-of-living crisis and fuel cost rises adversely impacting the viability of
businesses to be able to afford occupying high street spaces.  As an island
community, the decline in footfall due to alternative online / home delivery
options is less pronounced. 
In Rothesay, tourism is a core component of the island’s economy, architecture
and heritage such as Mount Stuart, Bute Museum, Rothesay Castle, Victorian
Toilets and seafront which all attract tourists and bring business to the town. 
Cycling is also popular with the island which is part of the five ferries challenge
route with many cyclists travelling west to Rhubodach ferry terminal.
1.10 Utilities and Known Constraints
To understand the utilities within the area, a search of utility apparatus within the
study area was undertaken.  These are summarised as follows:
Water supply 
The Scottish Water plan has indicated a 90mmm HPPE pipe below Victoria Street
along the extent of the route. Consideration should be taken for any works
undertaken within the vicinity of the pipe work in line with Scottish Water
guidance.  
Electricity
Line search before you dig has indicated multiple HV main cables in the vicinity
of the project route. Consideration should be taken for any works undertaken
within the vicinity of the cables in line with SSE guidance. 
Foul/Surface Water
Scottish Water GIS plan has indicated a water main is present along Victoria
Street.  
Communications
Telecommunication apparatus was noted to be located along Victoria Street. 
Gas
Gas apparatus was noted to be located along Victoria Street. 
Flood Risk
An extract of the SEPA flood risk for the project area is supplied separately.  The
extract confirms that the project route is not at risk of flooding from a 1:200-year
event. 
Page 312

Page 313

13 | P a g e
www.connectedtp.com 
1.11 Landownership and Rights of Access
The project route extent consists of road space publicly adopted by Argyll and
Bute Council.  The putting greens, flower beds and promenade are owned by the
council.  The Discovery Centre is currently owned by Visit Scotland.  Much of the
land on the wider Isle of Bute is owned by the Mount Stuart Estate.
The project area is flanked by commercial and residential properties. 
The approximate extent of council ownership is presented in Appendix A.
1.12 Understanding Travel Behaviour
The study route forms one of the two major traffic routes in Rothesay.  The route
will complement the ongoing Joint Campus to Ferry Terminal route currently
undergoing development.  Once complete, both routes would provide network
within the town centre supporting access from key trip generators to key trip
attractors.  This will include trips to and from local services and towards the
residential areas.
1.13 School Travel
A sample Hands-up Survey (HuS) was undertaken during February 2024 to
understand how the community’s younger members currently travel to the
primary school.  The results of the sample survey show that pupil’s dependency
on travel by car (60%) and bus (40%).  Only 1% of the surveyed children walk to
school and even fewer cycle.
The school engagement has confirmed that a number of the town's younger
members do own bikes and regularly walk or cycle along the route.  The school’s
location relative to the study area is however unlikely to be a key indicator of
suppressed active travel demand for the project route. 
Travel Mode Morning Trip Afternoon Trip
Walk 0 2
Cycle 0 0
Bus 7 11
Car 14 7
Ferry 1 0
Whilst pupil walking is popular, the school is located remote from the study area
Page 313

Page 314

14 | P a g e
www.connectedtp.com 
1.14 Public Transport
Bus services around the town are contracted by Argyll and Bute Council and
currently operated by West Coast Motors who provide public transportation
services in various regions of Scotland. They offer a schedule of bus services
connecting the various towns to Rothesay including Ardbeg and Ettrick. 
A review of the bus services offered suggest that the town benefits from an
effective public transport service with a wide range of services operating on a 30-
minute service frequency.
1.15 Baseline Data
To support this project, a number of data sources were commissioned to provide
a snapshot of people and traffic volumes speeds and movements during February
2024.  The town is a known tourist destination with many visitors arriving
between May and September.  Any traffic survey undertaken during the peak
seasonal period of May to September will therefore likely reflect seasonal peak
(worst case) results.
The surveys consisted of Automatic Traffic Counters (ATC) installed for 7 days
along A844 Victoria Street, Albert Pier.   Junction Turning Counts (JTC) were
undertaken at Victoria Street / High Street and the Albert Pier / Bishop Street
junctions.  The counters recorded all vehicle movements including speeds by
direction continuously.  
To support an understanding of parking behaviours in the area, parking surveys
were also commissioned to capture parking on-street along Victoria Street and
Albert Pier including two car parks.
In addition to the ATCs, Non-Motorised Users (NMU) surveys were also
undertaken during the same period.  The NMU surveys were located at key
locations along the route corridor. 
Location and range of survey data collection
Page 314

Page 315

15 | P a g e
www.connectedtp.com 
1.16 ATC Results
The results of the surveys indicate that the typical traffic volumes along Victoria
Street in the vicinity of the Pavilion are around 1,8006 vehicles per day in both the
southbound and northbound directions. These volumes are low when compared
with the roads theoretical design capacity.  Vehicle speeds were noted to be in
excess of the speed limit with an 85th percentile speed of 34mph being recorded
(30mph limit).
Nearer to the ferry terminal junction, eastbound vehicle numbers increase to
around 2,800 vehicles per day.  This indicates that traffic travelling along
Montague Street turns right onto Victoria Street as part of a ‘gyratory’ loop. 
Westbound traffic flow is 1,600 vehicles per day.  85th percentile speeds of
vehicles were noted to be under the speed limit with the eastbound recorded at
25.5mph and the westbound at 26.5mph.
To the east at Albert Pier, the number of vehicles travelling in both the eastbound
and westbound directions was notably lower at around 1,000 vehicles per day. 
85th percentile speeds were noted to be around 24mph with vehicles travelling
westbound noted to be marginally slower at 22mph.  This may be as a result of
vehicles having to slow down on approach to the Bishop Street roundabout.
Traffic composition along this route is 86% cars or light vans with 14% classed as
Heavier Goods Vehicles (HGVs). 
6 February 2024 12-hr AAWDT 
1.17 Non-Motorised Users (NMU’s)
During the same survey period, NMU surveys were located on the terminal
junction and the Bishop Street / Albert Pier junction and recorded a single-day
snapshot of pedestrian and cyclist movements.  The surveys captured all
ATC results by location
Page 315

Page 316

16 | P a g e
www.connectedtp.com 
pedestrian and cyclist numbers by travel direction within a 12hr day 07:00 to
19:00 over a typical off-peak weekday. 
The results of the surveys indicated that at the ferry terminal junction the daily
pedestrian flow was 144 people travelling east/ west on the northern side of the
footway (coastal) and 132 travelling east /west on the inland footway.  Pedestrian
movements along the Victoria Street section to the High Street junction is noted
to be high with around 614 movements recorded on the inland footway. The
majority of these movements then turn right and travel south along High Street.
Unsurprisingly, the cycling numbers are low at this location, noting the time of
year (February). Around 7 were recorded over the course of the day, favouring
the coastal side footway. 
1.18 ABC Cycle Counters
ABC have installed a permanent pedestrian and cycle loop counters on the
Esplanade.  With the exception of when the counter has malfunctioned, the
counter captures data continually 24hours per day and by each day of the year.
The data can be used to understand how the number of pedestrians and cyclists
change over the year. 
The results of the counter indicate that since 2020, the number of pedestrians /
cyclists have declined up to 2022 which may be the result of COVID19 on tourist
visitors to the island.  From 2022 the counter would appear to be malfunctioning. 
Ferry Terminal Junction Off-Peak 24hr Pedestrians and Cyclist Movements
Victoria Street Zebra -Off-Peak 24hr Pedestrians and Cyclist Movements
Page 316

Page 317

17 | P a g e
www.connectedtp.com 
Notwithstanding the above, the data captured by the counter for 2019 would
appear to be complete.  Using this data a comparison of pedestrian’s and cyclist
demand between an off-peak month and day (February) and a peak season
weekday in September can be estimated.
The results of the comparison are shown in the following figure and indicate that
during the peak season, the number of pedestrian / cyclist trips increases from
174 to 282. This is an increase of 62%. 
1.19 Parking
Parking surveys were undertaken during early February 2024. The surveys
included Chapelhill and Albert Pier off-street car parks and on-street parking. The
survey results indicate that Chapelhill has a capacity of around 25 spaces with
around 40% of these unused during successive town visits.  Albert Pier has an
official parking capacity of 20 vehicles but during both the weekday and weekend
surveys around 18 to 22 vehicles were parked within the car park and a peak
parking occupancy of 31 vehicles was observed.
Summary of Esplanade Counter Walk / Cycle Data
ABC Off Peak-to-Peak 2019 Pedestrian Cyclist Comparison
Page 317

Page 318

18 | P a g e
www.connectedtp.com 
The parking duration for vehicles parking within the car parks is noted to be long
at over 5 hours suggesting that the spaces are used by the staff of nearby
businesses or local residents. 
Albert Pier Weekday / Weekend Parking Summary
Page 318

Page 319

19 | P a g e
www.connectedtp.com 
February 2024 Off Peak Parking Survey along A844 Victoria Street / Albert Pier
Page 319

Page 320

20 | P a g e
www.connectedtp.com 
1.20 Road Safety 
A review of the Crash Map Road Safety7 website indicated that there have been
no incidents documented in the vicinity of the study route between 2018 and
2023. The nearest recorded accidents occurred in the public car park opposite the
kiosk, just off Vicotria Street. The accident was serious, involving only one vehicle
and one casualty. A second serious incident was recorded on Guildford Square. 
No details were available.
It's important to note that this does not necessarily imply that no accidents have
taken place within the study route, but rather that emergency services were
either not required or not notified. 
7 https://www.crashmap.co.uk/
Accident History 2018 - 2023
Page 320

Page 321

21 | P a g e
www.connectedtp.com 
1.21 Parking, Access and Management
Parking within the study area is split between off-street car parks and on-street
parking.
Within the study area, a number of off-street parking areas are located, all free of
charge, consisting of:
• Chapel Hill Road. Providing 25 vehicles spaces. During the February site visit,
it was noted that a number of the parking spaces are occupied by the bins
from surrounding properties or caravans.
• Albert Place Car Park. Proving parking for around 20 vehicles.
• East Princess Street. Providing parking for around 5 vehicles.
There is adequate designated parking along the promenade to cater for all
observed parking numbers. It’s noted there is a lot of pavement parking in the
southeastern section of Rothesay due to the narrow width of the road and
parking on the opposite side residents and visitors are parking with all 4 wheels
on the footway.
For electric vehicles, two 22kW, 32A charging points are available at Guildford
Square Car Park, less than 100m from the Terminal Building.  
The Isle of Bute historically operated a Community Car Club which was open to
both residents and visitors. 
Pavement parking is a common occurrence Page 321

Page 322

22 | P a g e
www.connectedtp.com 
1.22 Current Travel Patterns
The 2011 census data for Rothesay was examined to understand current travel
behaviours and travel patterns within the project area.     
It is noted that more rural locations are more likely to be more dependent on
private car use when compared with the Scottish average.  However, as stated
previously, car ownership for Rothesay remains comparably lower at 41%.  
Rothesay is currently participating in the 2024 ‘Beat the Street’ Active Travel
programme.  The results of the initiative may be available for the next stage of
this project. 
1.23 Understanding The Communities Demographics
The National Records of Scotland data as at 2022 shows the population of
Rothesay was 4,320.  14.3% were children, 55.1% were aged 15-64, 30.6%
were over 65 years of age and over.  
There is a greater percentage decrease in the population aged 0-15 years
compared to Highland or Scotland.8 The National Records of Scotland shows the
population has decreased by 16% in the period 2002 to 2022 with a difference 
8
https://www.citypopulation.de/en/uk/scotland/argyll_and_bute/S19002472__ro
thesay/
between age groups concerning population change. There was a 63% increase in
the 65+ age group, which occurred year on year since 2002
Over the next 10 years, the population of Argyll and Bute is projected to decrease
by 6.2% due to natural change (more deaths than births). Notwithstanding, total
net migration (net migration within Scotland, from overseas and from the rest of
the UK) is projected to result in a UK population increase of 0.5% over the same
period.9 
9 https://www.nrscotland.gov.uk/files/statistics/council-area-data-sheets/argyll-
and-bute-council-profile.html
Page 322

Page 323

23 | P a g e
www.connectedtp.com 
1.24 Where do People Currently Cycle?
Rothesay is part of the Bute Cycle Network, a 23-mile loop around the Isle of
Bute which runs through Rothesay and right along the A844 Victoria Street which
is the site of the proposed development. This demonstrates demand for cycling in
the Rothesay area, and a key tourist attraction. 
1.25 Health and Wellbeing
Being more physically active can benefit everyone and can reduce the chances of
developing preventable conditions such as diabetes and heart disease. Active
travel as promoted by this project will encourage individuals to be more physically
active as part of their daily routine by incorporating physical activity into everyday
tasks.  This reduces the need to find extra time, money or motivation for
exercise. 
The route could also offer savings to some users by saving on fuel, and vehicle
running costs. Making short journeys using active travel helps to reduce the
number of vehicles on the road and improves local air quality and environmental
amenities.
Investment in active travel can also deliver economic benefits with shoppers who
are actively spending less per visit but making more frequent visits and spending
more. Active travel is affordable and delivers value for money in achieving health,
transport and wider policy objectives. 
Studies on the economic benefits of walking and cycling interventions in the UK
revealed an average return of £13 for every £1 invested and returns as high as
£19 for every £1 invested.  
Cycling and Walking Activity from Strava
Page 323

Page 324

24 | P a g e
www.connectedtp.com  OPTIONS DEVELOPMENT AND APPRAISAL
Page 324

Page 325

25 | P a g e
www.connectedtp.com 
2 OPTIONS DEVELOPMENT AND APPRAISAL
2.1 Investigating the Network
In advance of the Stage 1 Community Engagement process undertaken during
February 2024, the design team worked with the steering group to identify
multiple route corridors which could be used to help identify the community’s
appetite for change and set the ambition for the design.  
The concepts were developed in stages set out as follows:
• A constraints plan was developed to capture all known geographic,
ecological and physical considerations within the identified route
corridors.  Following engagement with Bute Community Council and ABC,
a land ownership register was produced to accompany a land ownership
plan.  A suite of data collection surveys was commissioned, including
traffic surveys and NMUs. The results were consolidated and considered.
• The previous 2020 spatial masterplan report for Rothesay Town and the
route concept options developed between the Pavilion and Ferry Terminal
junction were examined.
• The results of the traffic surveys were considered in conjunction with the
route design guidance provided within Transport Scotland’s Cycle by
Design Guidance 2021 update.  
• Through a workshop discussion between the design team and ABC
representatives, it was noted that the study corridor is formed in two
halves, each with a different set of challenges. A section between the
Pavilion and the ferry terminal junction benefits from additional road
space and therefore a number of potential group options are possible.
Between the ferry terminal and the Albert Pier Carpark the route corridor
is more constrained and the development of a route option would be
more challenging. There are fewer options available for the route in this
location.
• It was noted that the Esplanade already provides a good quality walking
and cycling route which should ideally support the majority of the route
design. The use of the Esplanade was also noted to be a key objective of
previous studies.  The Esplanade was debated within the design team
and a number of technical challenges were identified. These included
avoiding alteration to the sea defence and the challenges of tying the
route at the terminal back to the ferry terminal junction. On reflection it
was agreed that the Esplanade must be promoted as an option for
consideration.
• Between the Pavilion and the ferry terminal junction a total of five
concept route alignments were identified. 
• Between the ferry terminal junction and Albert Pier, a total of three route
alignments were identified.
• Utilising the design team experience in conjunction with the guidance
provided within Cycle by Design 2021, the concept options were created.  
Page 325

Page 326

26 | P a g e
www.connectedtp.com 
It was agreed appropriate that the stage 1 of the project should be to sample the
community’s preference on route corridor.  The options considered are
summarised as follows and graphically overleaf. 
Option Pavilion to Ferry Terminal Route Concept Description
1 Route formed on Esplanade. Use existing route and connect back to
Victoria Street at the Ferry Terminal either through the inner harbour
or along the side of the Front Green
2 Widen existing footpath into winter gardens. Route on inland side of
A844
3 Widen footpath on inland side to suit width constraints.  Maintain
current road widths by widening onto coastal side of A844
4 Reallocation of road space to suit new widened footpath on coastal
side of A844
5 Reallocation of road space to suite new widened footpath on inland
side of A844
Rothesay Victoria Street Typical Cross Section
Options
Page 326

Page 327

27 | P a g e
www.connectedtp.com 
Option Ferry Terminal to Albert Pier Route Concept Description
A Widen route and provide path on inland side 
B Widen route and provide path on coastal side 
C Shared use of West Princess Street then widen route and provide a
path on the inland side of the road
A844 Albert Place Typical Cross Section Options
Page 327

Page 328

28 | P a g e
www.connectedtp.com 
All Route Corridor Options Initially Considered
Page 328

Page 329

29 | P a g e
www.connectedtp.com 
2.2 Pavilion to Ferry Terminal Junction: Route Summary
Descriptions
Each of the route options are described in greater detail as follows.
Option 1: Route formed on Esplanade. Use existing route and connect
back to Victoria Street at the Ferry Terminal
Length 646m
Description Widen the pinch points on the esplanade and provide improved
connection to Ferry Terminal junction
Key 
Challenges
• Avoid impact on sea defences
• Ramps and stairs will require realignment
• Limited corridor space at terminal end
• May not present as attractive alternative to Victoria Road (not
direct enough)
• Busy during summer peaks
• Coastal exposure
Key
Opport’ies
• Most direct route for tourists from ferry
• Car free route
• Lower capital costs
• No impact on bus, servicing or loading
• More pleasing environment
• Limited impact on existing drainage systems
• Limited impact on the front green area 
Option 2: Widen existing footpath into winter gardens. Route formed on
inland side of A844
Length 604m
Description Following Victoria Street, the route would be formed on the inland
side of the street. The road cross section would be maintained with
the whole road being shifted into the front gardens area by around
2m
Key 
Challenges
• Major impact on kerbs, drainage and services
• Increased risk of cycle / pedestrian conflict
• Higher capital cost
• Potential impact on Front Green
Key
Opport’ies
• Cycle route on busiest inland side nearest all key trip attractors
• Most direct route
• Avoid changes to front green
• Simpler interface with Ferry Terminal Junction  
Option 3: Widen footpath on inland side to suit width constraints. 
Maintain current road widths by widening onto coastal side of A844
Route
Length
604m
Description Following Victoria Street, the route would be formed on the coastal
side of the street. The road cross section would be maintained with
the improved active travel facilities extended into the front gardens
area
Key 
Challenges
• Major impact on kerbs, drainage and services
• Some impact on front green area
Page 329

Page 330

30 | P a g e
www.connectedtp.com 
• Higher capital cost
Key
Opport’ies
• Cycle route near all key trip attractors
• Most direct route
• Simpler interface with Ferry Terminal Junction 
Option 4: Reallocation of road space to suit new widened footpath
on coastal side of A844
Length 604m
Description Following Victoria Street, the route would be formed on the
inland side of the street. The road cross section would be
adjusted to narrow the carriageway width to avoid impact 
Key 
Challenges
• Major impact on kerbs, drainage and services
• Some impact on front green area
• Higher capital cost
Key
Opport’ies
• Cycle route near all key trip attractors
• Most direct route
• Simpler interface with Ferry Terminal Junction 
Option 5: Reallocation of road space to suite new widened footpath
on inland side of A844
Length 604m
Description Following Victoria Street, the route would be formed on the
coastal side of the street. The road cross section would be
adjusted to narrow the carriageway width to avoid impact with
the gardens area by around 2m
Key 
Challenges
• Some impact on kerbs, drainage and services
• Higher capital cost
Key
Opport’ies
• Cycle route near all key trip attractors
• Most direct route
• Simpler interface with Ferry Terminal Junction 
Page 330

Page 331

31 | P a g e
www.connectedtp.com 
2.3 Ferry Terminal Junction to Albert Pier: Route Summary
Descriptions
Each of the route options are described in greater detail as follows.
Option A: Widen route and provide path on inland  
Length 245m
Description Route would be formed on inland side of A844 Victoria Road
Key 
Challenges
• Limited route corridor space will limit the extent of design
possible.
• Impact on taxi and bus rank
• Albert Pier Car park will be impacted
• Area is heavy parked
• Will impact on coach parking at Albert Pier
Key
Opport’ies
• Route coherence
• Most direct route option 
Option B: Widen route and provide path on coastal side 
Length 245m
Description Route would be formed on coastal side of A844 Victoria Road
Key 
Challenges
• Limited route corridor space will limit the extent of design
possible.
• Impact on taxi and bus rank
• Albert Pier Car park will be impacted
• Area is heavy parked
• Will impact on coach parking at Albert Pier
Key
Opport’ies
• Route coherence
• Most direct route option 
Option C: Shared use of West Princess Street then widen route and
provide a path on the inland side of the road.
Length 260m
Description Using West Princess Street at a mixed traffic street to avoid the
taxi and bus rank, the route would rejoin Victoria Street at Albert
Pier. The route would then be formed on the coastal side
Key 
Challenges
• Limited route corridor space will limit the extent of design
possible.
• Albert Pier Car park will be impacted
• Area is heavy parked
• Least direct option, may not be used
Key
Opport’ies
• Route coherence
• Avoid impact on taxi and bus rank 
Page 331

Page 332

32 | P a g e
www.connectedtp.com 
2.4 Considering The Technical Challenges
Albert Pier Coach and Vehicle Parking
The Albert Pier car park has a marked capacity for 20 vehicles consisting of 17
cars and 3 coaches. Parking capacity is nearer 30 vehicles with cars and
campervans often parking along the waterfront footway.  The car park is
irregularly shaped limiting the options to reconfigure the space to increase
parking capacity.  A key feature of the facility is the provision of 3 coach sized
parking bays.  These are understood to be well used during the peak summer
months and should ideally be retained.
A derelict pier building currently occupies the site and is noted to be an eyesore.
Demolition of the building would contribute towards providing additional parking
capacity whilst the building itself could be reinvested as a public toilet or an active
travel community hub.
Taxi Rank
The taxi rank is located between the ferry terminal junction and the Bishop Street
roundabout.  The taxi rank is large supporting around 20 taxies (parked end in).
The taxi rank is well used but could be reduced in scale.  This would provide
some additional road space within this constrained location. 
It is unclear at the time of writing what the optimum capacity of the taxi rank
should be. It is also noted that currently taxies are parking end in. This requires a
reversing manoeuvre on the main road which is considered less safe and best
avoided. 
Bus Stance
The bus stance is located adjacent to the taxi rank in front of the harbour and
Guildford square. The stance can support a total of 4 coaches (2 per direction)
within the lay-bys provided. Access between the stops is supported by a zebra
crossing which ais also aligned with the pedestrian access to the inner harbour
and ferry terminal building
Ferry Junction
The ferry junction is a key node point in the network. The junction is an irregular
shape and partially signalised to support the egressing movements of ferry
vehicles. The junction does not support the movement of pedestrians, cyclists of
other non-motorised users. 
Page 332

Page 333

33 | P a g e
www.connectedtp.com 
Traffic Volumes 
It is noted to be very challenging to accurately predict any changes to traffic
volumes as a result of the concept being implemented.  This is primarily due to
the challenges in forecasting drivers route decision making within a complex
urban area which reflects the level of congestion and vehicle speeds at that time. 
Vehicle numbers are noted to be in excess of the 300 vehicles per day Cycle by
Design threshold with Victoria Street and Albert Pier catering for over 10% in
Heavy Goods Vehicles.  As a result, a facility segregated from the carriageway will
be required. As the route is within a 30mph area, the segregation strip may be a
narrow as 0.5m subject to agreement of technical standards.
Loading and Servicing
Currently, loading and servicing along Victoria Street is catered for by frontage
access.  Service vehicles park where they can (sometime across bus stops) and
utilise pallet trucks to make deliveries through the business’ front doors.  Road Safety
Feedback received through the stage 1 engagement combined with on-site design
team observation indicates that there are a number of road safety challenges that
could be addressed through the project design process. These include:
• Crossing of pedestrians on Victoria Street which often requires
pedestrians to cross between parked cars. A lack of formal crossing
points limits the mobility of those less able. The most obvious points for
crossing support are the ferry terminal junction, at the Pavilion and
Victoria Street Frontage Loading
Page 333

Page 334

34 | P a g e
www.connectedtp.com 
outside the Discovery Centre.  Higher vehicle speeds and lower level of
lighting during the darker winter months exacerbate this issue.
• Cycling along Victoria Street / Albert Pier is not comfortable for less
confident cyclists as they are required to cycle on the live carriageway
between parked cars and moving vehicles.
• High Street / Ferry Terminal junction is unwelcoming to pedestrians and
cyclists, with no pedestrian crossing provision and wider crossing
distances increasing crossing risk.
• Cyclist / pedestrian conflicts along the esplanade could be addressed
through segregation of the user groups.
• Pedestrian routes to the ferry terminal junction are not well sign posted
for visitors.
• There is no cohesive cycle network to support access south along High
Street towards the joint campus.
Street Trial 
The idea of a street trial to test concept 1 was raised during the public
engagement event.  Street trials are normally reserved for Category 4 (or bigger)
PfE funded projects where the scale of the project would justify the additional
costs of appraising the concept.  Notwithstanding, Rothesay is a small scheme
with a likely small cost associated with producing a Temporary Traffic Regulatory
Order (TTRO) and temporary surfacing works required to test the concept. The
preparation of the temporary order will however take time requiring public
notification and collaboration with Argyll & Bute Council.  
Following discussions with the study steering group, it has been agreed that a
street trial is not a practical option to test as the extent of temporary works
required to safely implement the concept would be excessive and ultimately
unmanageable.
Maintaining The Design
A key challenge to all placemaking design options relates to the development of a
robust maintainable design. Often the choice of materials that meet the
maintainability criteria will be restrictive as Argyll & Bute Council will need to
maintain a store of the materials to support future repair works.
A number of services are noted to be present along Victoria Street.  Evidence
recorded on site indicates that ongoing repair and replacement works by utility
service providers will continually disturb any new design.
It is unlikely to be possible to relocate the services as part of the design process
due to the likely disproportionate costs.  Alternatively, the design and material
selection should take cognisance of the need to access services and be provided
to improve the quality of any repair works.
The choice of design materials will require careful consideration as part of the
next stages of the project and will be discussed in greater detail in the next
chapter of this report. 
Page 334

Page 335

35 | P a g e
www.connectedtp.com 
Preliminary Flood Risk Assessment 
The site has been reviewed for potential sources of flooding following ABC
Supplementary Guidance on Flood Risk. These are outlined below along with a
qualitative assessment of the risk they pose to the route. 
• Fluvial Flooding: The SEPA Indicative Flood Map shows that the
location of the site is not within the area of fluvial flood risk. 
• Pluvial flooding: The SEPA Indicative Flood Map shows that the location
of the site is not within the area of high pluvial flood risk. 
• Coastal Flooding: The SEPA Indicative Flood Map shows that the
location of the site is not within the area of high coastal flood risk.
To summarise, the site is not considered at risk of flooding and no further
investigation is deemed necessary.
Community Feedback
Reference is drawn to the results of the community and stakeholder feedback
reported within the Community Feedback Report.  A summary of the community’s
feedback is summarised as follows:
Concerns relating to the use of the existing road route
• Parking is at a premium within the town. Many of the town’s frontage
buildings do not have alternative parking locations.  Parking stresses
increase with the influx of summer tourists.
• Parking at the Albert Pier end of town is particularly challenged. Camper
vans, tour buses / coaches are understood to park on and along the
footways.
• The town roads are well trafficked by a number of HGVs (14%). These
are often larger tractors or lorries.
• The ferry terminal area is considered unsightly. There is opportunity to
improve connection.
• The front green should be protected.
• The ferry terminal / High Street junction is noted to limit access by some
user groups. The junction does not include a provision for the mobility
impaired and is difficult to navigate.
• There is a lack of crossing opportunities along Victoria Street to support
the movement of pedestrians and cyclists.
• Improve cycle walking connectivity between the ferry terminal and the
Esplanade and between the Esplanade and Albert Pier.
Aspirations for the future design
• Victoria Street could be improved to include a central boulevard including
palm trees. This would improve crossing potential and reduce
carriageway width. 
Page 335

Page 336

36 | P a g e
www.connectedtp.com 
2.5 Initial Options Sift Workshop
The design team met to discuss the feedback of stage 1 consultation and
investigate the route options being considered.
Victoria Street
The options were debated during a design team workshop.  It was noted that
option 1, the esplanade was strongly preferred by the small community sample
with the primary justification being to avoid any negative impact on Victoria
Street parking. The route would however require alterations to the sea defences
in a number of locations including the installation of a sea defence gate.  These
changes were not acceptable to ABC due to risk of reducing effectiveness of flood
defences and would require further investigation.  Notwithstanding, option 1,
when compared with the Victoria Street options, would also be a less direct route
for those wishing to pass along Victoria Street with the route being further
disconnected from local everyday High Street services.
It was also noted that the widening of the route (options 2 and 3) into the front
green offered similar benefits to options 4 and 5 but would add significant
additional cost to the project. It was therefore concluded that these options
should only be considered if options 4 and 5 that used the existing road space
could not be realised.
Using the street width measured from OS mapping in combination with the
options cross sections and feedback received, it was concluded during the
workshop that options 4 and 5 can be accommodated within the existing road
space, maintaining on-street parking.  Further investigation of these two options
highlights that the option four with the route formed on the coastal side would be
the most deliverable option.  
Option 5 was felt to also reflect the most direct and coherent of the route options
retaining cycle and walking activity on the business and residential side of the
street and avoiding the need for promoting additional crossing movements. 
Page 336

Page 337

37 | P a g e
www.connectedtp.com 
Albert Pier
Options A, B and C were considered further with option C – using Princess Street
discounted on the basis that the route is too convoluted to be utilised. The taxi
rank design was investigated further and it was noted that should this facility be
rescaled and reorganised, the route could be accommodated along Albert Pier to
the Albert Pier car park with no adverse impact on parking.
It was noted that Albert Pier car park has a capacity of c.20 vehicles with a
typical parking demand for 30 vehicles, even during the off-peak February survey.
It has been concluded that all the design options would have an impact on the
car park and / or on-street parking capacity. Consideration should therefore be
given to either truncating the route option at the Ferry Terminal junction or
seeking to identify alternative parking mitigation options to offset the parking
impacts from both this project and the Joint Campus to Ferry Terminal. 
The route design standard was subjected to review using Transport Scotland’s
Cycling by Design 2021 guidance, noting the results of the vehicle traffic/speeds,
the number of potential NMUs.
Stakeholder Feedback
Reference is drawn to the results of the community and stakeholder feedback
reported within the Community Feedback Report.   
2.6 Route Appraisal Against Cycling by Design (CbD) 2021 
The route corridor was subjected to a review using the Sustrans route
assessment criteria in combination with Cycling by Design 2021.  The concepts
were scored ranging between 1 – 3 with 1 reflecting a ‘high level’ of service and 3
a ‘low level’ of service. The assessment was undertaken by the design team as a
workshop discussion to allow each route option and assessment criterion to be
discussed and scored.
The criteria considered in the assessment included:
• Indicative Cost;
• Deliverability;
• Accessibility;
• Local Need;
• Coherence;
• Directness;
• Comfort;
• Attractiveness; and
• Adaptability.
The resulting assessment identified that a number of the concepts, unsurprisingly
would need further investigation to determine an appropriate standard of design
provision.  
No consideration of the relative weighting of the evaluation criteria has been
undertaken. 
Page 337

Page 338

38 | P a g e
www.connectedtp.com 
Route /
Option
Length
(m)
Proposed Intervention
Structures
Required /
Altered 
1 High level of Service 10-14
2 Medium level of Service 15-23
3 Low level of Service 24-30
Costs
Deliverability
Accessibility
Local Need
Safety
Cohesiveness
Directness
Com
fort
Attractiveness
Adaptability
Total
Option 1  646 Route formed on Esplanade. Use existing route and
connect back to Victoria Street 
yes 2 1 2 2 1 2 2 1 2 2 17
Option 2 604 Widen existing footpath into winter gardens. Route
formed on inland side
no 3 3 1 1 2 1 1 2 1 1 16
Option 3  604 Widen footpath on inland side to suit width constraints. 
Maintain current road widths by widening onto coastal
side
no
3 3 1 1 2 1 1 2 1 1 16
Option 4  604 Reallocation of road space to suit new widened footpath
on coastal side
no 2 2 1 1 2 1 1 2 1 1 14
Option 5 604 Reallocation of road space to suite new widened
footpath on inland side
no 1 1 1 1 2 1 1 2 1 1 12
Option A 245 Widen route and provide path on inland side keeping
road as it is.  
no 2 2 1 1 2 1 1 2 1 1 14
Option B 245 Widen route and provide path on coastal side keeping
road as it is.  
no 2 2 1 1 2 1 1 2 1 1 14
Option C 260 Shared use of West Princess Street then widen route
and provide a path on the inland side.
no 1 1 3 1 2 3 3 2 2 1 19 
Page 338

Page 339

39 | P a g e
www.connectedtp.com 
2.7 Recommended Stage 1 Outcomes
• Option 1 should be progressed subject to detailed conversations with ABC
stakeholders regarding sea defence changes and scope of connection
through to CalMac terminal 
• Options 5 should be developed to concept stage 2 with route provided on
coastal preferred as smaller works and cheaper, space available, coherent
and consistent with Albert Pier
• Option B Coastal for Albert Pier should be progressed to stage 2 concept
design
• Recommend redesign of Albert Pier as parking demand at this location
will negatively ‘over shadow’ the other merits delivered by the project.
Alternatives are to explore community car park near Albert Pier.  This
may provide joint benefit to offset parking impacts associated with the
Ferry to Joint Campus route.
2.8 Considering Those with Protected Characteristics
An appraisal of the project has been undertaken using a Social and Equality
Impact Appraisal template (SEQiA). The results of the assessment are included in
Appendix B.
Taking cognisance of the appraisals summarised previously it is noted that all
concepts would be provided to achieve a Cycle by Design ‘high standard’ of 
10 Subject to reducing total traffic flow
provision10.  Once a preferred route alignment has been determined the design
should consider best practices to maximise the route accessibility for all user
groups and abilities. 
Page 339

Page 340

40 | P a g e
www.connectedtp.com 
NEW CHAPTER  
DEVELOPING THE CONCEPT
Page 340

Page 341

41 | P a g e
www.connectedtp.com 
3 DEVELOPING THE CONCEPT
3.1 Developing the Options
Following approval of progress by Argyll and Bute Council Officers, option four,
‘Reallocation of road space to suite new widened footpath on coastal side’ has
been selected for further development. 
3.2 Designing with Nature
A key consideration of the design process is to avoid an impact on flora and
fauna.  A Preliminary Ecological Appraisal (PEA) was commissioned in support of
the options development process. The assessment identifies and reports on a
limited number of ecological points of note within the study route. The ecological
constraints plan was overlaid on the concept option plan to check that the
concept does not impact on any ecological matters.
The check confirmed that the concept is not likely to have any impact.  Further
validation should be undertaken at stage 3, detailed design.
3.3 Developing the Design
The concept was subject to continual development to address the challenges
noted. These included:
• Redesigning Albert Pier Car Park layout to maximise parking capacity by
reducing circulation space and removing the derelict kiosk building.
• Improve parking capacity of the off-street parking area opposite Albert
Pier by standardising the parking layout and adopting a herringbone
layout.
• Improve coach parking by avoiding reversing and manoeuvring space
promoting a drive in and drive out layout.
• Address existing pavement parking by separating the pavement from the
parking area by including the coach parking in between. This layout is
anticipated to reduce pavement parking along Albert Pier.
• Formalise on-street parking by introducing marked bays.  These will
assist in maximising parking capacity by supporting drivers to park within
the spaces provided.
• Reduce the overall operational carriageway width to 6.5m.  This will allow
improved crossing opportunities for pedestrians.
• Increase the number of pedestrian crossing points along the route. The
crossing points are located where the community expressed a need for
improved crossing. 
• Redesign the CalMac entrance to reduce carriageway space whilst
retaining the same vehicle stacking capacity for the ferry.
3.4 Maintaining the Concept
A key challenge of any design is ensuring the robustness and minimising future
maintenance requirements of any network changes.  To support this, a series of
Page 341

Page 342

42 | P a g e
www.connectedtp.com 
workshops were held with Argyll and Bute Network Management Representatives
in advance of developing the final concept design.  In advance of each workshop
a concept option plan was shared to support discussion.  The key points of each
workshop are summarised in the remainder of this chapter.
Argyll and Bute Network Management (Workshop 2)
• Due to carriageway construction and drainage arrangements, developing
the route on the A844 route on coastal footway side was agreed to be
the preferred route option.
• The operational carriageway width must be maintained at a 6.5m
minimum to give extra space allowance for HGV and buses.  It was
agreed that the road narrowing would improve pedestrian crossing
opportunities and help encourage appropriate vehicle speeds.
• Noting the potential impacts of the concept on the ferry vehicle access,
the Harbour Master and CalMac operator should be consulted to
understand better any operational impacts.
• Improvements to parking capacity along the route are supported. Any
changes should consider seasonal parking impacts and the demand for
coach and camper van parking where possible.
• Improved access options should explore the use of ramps and avoid the
suggested gate in the sea defence wall. This will improve connectivity for
cyclists and wheelchair users to access the winter gardens from the
CalMac terminal while not risking reducing the effectiveness of the sea
defences.
• The trees located along Victoria Road should ideally be retained as the
public may have concerns regarding removal.
• There is limited scope to revert the roundabouts on the A844 to Priority
T-junctions. The town operates as a one-way gyratory and noting the
industrial activity to the north, the roundabouts must be retained to
support industrial traffic access onto the A844 from Bishop Street.
• It was agreed that there is scope to repurpose road space to better
accommodate different user groups.  This should ideally avoid the need
for the design to be widened into the front green / gardens.
• Any redesign of Albert Pier car park to maximise car parking capacity is
desirable.
• Exploring the use of herringbone parking layout solution at parking area
opposite Albert Pier should be considered.  End-in parking is undesirable
and should be removed through the design process due to safety
concerns relating to vehicle manoeuvring. This will most obviously impact
on the existing taxi rank.
Based on the feedback received, the concept design was developed considering
the above noted points.  The emerging design was again subject to review by
ABC network management and maintenance representatives. 
Page 342

Page 343

43 | P a g e
www.connectedtp.com 
Argyll and Bute Network Management (Workshop 3)
A third stakeholder workshop was initiated to discuss the approach to review the
emerging concept. The following points were noted:
• Due to limited road space, a cycle buffer strip width of 0.5m is promoted.
• The accommodation of the design within the existing carriageway kerbing
is noted to significantly reduce drainage concerns and overall project
construction costs.
• The proposed ramp solution at the sea defence wall just behind the
Winter Gardens in lieu of steps will provide improved connectivity
between the Esplanade and the CalMac terminal.
• The introduction of a drainage system is an option that ABC would
support but would increase the overall capital cost of the project.
• Improved and formalised parking capacity was welcomed.  The
formalising of on-street parking is noted to be a benefit. The improved
parking capacity at Albert Pier was noted to be beneficial. 
• Parking impacts at Albert Pier should be subject to further conversations
with ABC Economic Development team to confirm ABC aspirations to
provide additional coach parking.
• The Scottish Water building within the Albert Pier car park must be
retained. The design should be revised to include this.
• There is limited scope to resize the existing roundabouts but changes can
be considered subject to vehicle tracking analysis to ensure access by
larger vehicles can be maintained.
3.5 Vehicle Tracking Analysis
The concept design was subject to a vehicle tracking analysis using vehicle
tracking simulation software.  The tracking was undertaken at the locations
where the design was estimated to impact on the operational layout and
included: 
• The entrance, exit and circulation of the parking at Albert Pier;
• Access, egress and access to parking bays in the parking area opposite
the Albert Pier car park;
• Access, queuing and exit of the CalMac ferry terminal junction; and
• The resized roundabouts along the route length.
Vehicle tracking results can be found below: 
Page 343

Page 344

44 | P a g e
www.connectedtp.com 
Albert Pier Coach and Car Tracking 
Page 344

Page 345

45 | P a g e
www.connectedtp.com 
Albert Pier Coach and Car Tracking
Page 345

Page 346

46 | P a g e
www.connectedtp.com 
CalMac Junction HGV / Car Tracking
Page 346

Page 347

47 | P a g e
www.connectedtp.com 
Bishop Street HGV Tracking 
Page 347

Page 348

48 | P a g e
www.connectedtp.com 
3.6 Considering the Ferry Junction Operation
It was a decision by the stakeholders that the ferry operator should be
consulted regarding the proposed changes. A meeting was set up with CalMac
Ferry’s manager and the Harbour Master for Rothesay to review the emerging
concept. Key outcomes of the meeting included:
• General agreement regarding the operational layout changes to the CalMac
junction layout. Particularly that the layout might help queuing on access
back along Victoria Street.  This would reduce the requirement for occasional
marshal intervention and also improve the operation of the vehicle waiting
area for CalMac staff. 
• Consideration of options to improve visitor legibility of the queuing lanes and
intended operational management plan.
• Avoidance of the use of lines and signs due to longer term maintenance
challenges within a coastal location and the skewing movement of vehicle
tyres wearing road line markings.
3.7 Value Engineering Route Extent
As the design has been developed it was noted that the concept would offer
additional benefits from being extended from the current end point at Albert
Pier west towards Craigmore.  Following design team and client discussion, it
was agreed that the route should be extended to Glenburn Road where the
corridor width increases. This revised end point was agreed as this location
would afford more route options for future extension and therefore provided a
logical termination point for this project. 
3.8 Peak Season Parking Surveys
To better understand the parking demand within the study area and noting the
towns role as a key summer tourist destination, a second parking survey /
assessment was undertaken during June 2024. 
The surveys followed a similar scope to those undertaken during February 2024
to assist in comparison of the results. 
The June 2024 survey results are summarised as follows.  Page 348

Page 349

49 | P a g e
www.connectedtp.com 
June 2024 Peak Parking Survey along A844 Victoria Street / Glenburn Road 
Page 349

Page 350

50 | P a g e
www.connectedtp.com 
Understanding Parking Impacts 
Using the June 2024 parking data, an assessment of forecast parking
capacity impacts has been estimated.  A minimum parking bay space of
6m in length has been assumed to allow space for vehicle manoeuvring. 
For each section of the route as defined by the February parking survey
sections, an estimate of theoretical capacity of the current road layout has
been undertaken by calculating the length of available road space by
section available for legal parking and dividing this by the 6m bay length.
The calculation includes allowance to avoid parking across accesses and
on existing parking restrictions. 
The results of the comparisons for the on-street and off-street parking
provision is shown in the following tables.  The results indicate that as a
result of the concept design, the total number of parking bays has been
increased by 15 parking spaces (12 on street spaces and 3 car park
spaces).   
The majority of these additional spaces are located towards the Albert Pier
end of the route where the February parking surveys and stage 1
community feedback have indicated parking stress is at its greatest.
In general parking between the Pavilion and Albert Pier remains broadly
unchanged from the existing arrangement. 
On Street Parking 
Route
Section
Description
Road
side
Current
Theoretical
Capacity
Unchanged
Parking Post
Development
Proposed
Parking Bays
Post
Development
Difference
A
Pavilion
St John’s Place
South 19 - 20 1
North 0 - 7 7
B St John’s Place
Chapelhill Car Park
South 7 7 - 0
North 0 - 5 5
C
Chapelhill Car park
Chapelhill Road
South 10 10 - 0
North 10 10 - 0
D
Chapelhill Road
Gallowgate
South 5 - 3 -2
North 6 - 6 0
E
Gallowgate
Tower Street
South 11 - 12 1
North 11 - 11 0
F
Tower Street
High Street
South 8 - 10 2
North 8 - 4 -4
G High Street
Albert Place Zebra Crossing
South 0 0 - 0
North 0 0 - 0
H
Albert Place Zebra Crossing
Bishop Street
South 5 - 7 2
North 0 0 - 0
I
Bishop Street
Bishop Terrace Brae
South 24 24 - 0
North 0 0 - 0
J
Bishop Terrace Brae
Commodore Guest House
South 38 38 - 0
North 0 0 - 0
K Commodore Guest House
Glenburn Road
South 40 40 - 0
North 0 0 - 0
Total 202 129 85 12
Page 350

Page 351

51 | P a g e
www.connectedtp.com 
3.9 Coach, Taxi and Visitor Parking
The proposed concept includes three 17m long coach parking bays located
within Albert Pier which will replace the existing three coach bays currently
provided.  The coach parking will be accessed via a one-way in and one-way
out gyratory style operation.  This method of operation will ensure that no
coaches are required to reverse within the public road spaces whilst ensuring all
patrons are able to alight and disembark on the footway side away from the
road.
The proposed taxi layout will be redesigned to align vehicles parallel to road to
improve access for passengers and remove need to reverse off the main road.
This will reduce parking capacity to four allocated spaces.  Additional taxi
spaces may be possible through reallocation of adjacent public parking spaces.
The bus-stops located along Victoria Road will remain in approximately the
same location. 
3.10 Route Safety Audit
The emerging concept design were submitted to Drummond Black Ltd who
undertook a Stage 1 Road Safety Audit in support of the design. 
Full details of the audit and designers’ response are supplied separately.
3.11 Developing Route Cross Sections
The proposed concept design route cross-sections taken at various locations
across the scheme are shown in the following figure. 
Car Parks
Car Park  Existing Bays Proposed Bays Difference
Chapel Hill 21 21 0
Albert Pier 28 31 3
Total 49 52 3
Page 351

Page 352

52 | P a g e
www.connectedtp.com 
3.12 Forecast Construction Costs Estimates
An initial assessment of the capital cost of constructing each of the concept
options is set out in the following table.  
The estimates have been prepared by CTP using SPONS cost information and
relevant previous experience. The cost estimates should be treated as indicative
until complete estimates of construction costs are prepared during the stage 3
detailed design.
The option includes a 44% Optimism Bias reflecting the early concept design
stage.   
Page 352

Page 353

53 | P a g e
www.connectedtp.com 
3.13 Route Re-Appraisal Against Cycling by Design (CbD) 2021 
The route option was again subjected to a review using the Sustrans route
assessment criteria in combination with Cycling by Design 2021.  The concepts
were scored ranging between 1 – 3 with 1 reflecting a ‘high level’ of service and 3
a ‘low level’ of service. The assessment was undertaken by the design team as a
workshop discussion to allow assessment criterion to be discussed and scored.
The criteria considered in the assessment included:
• Indicative Cost;
• Deliverability;
• Accessibility;
• Local Need;
• Coherence;
• Directness;
• Comfort;
• Attractiveness; and
• Adaptability. 
The resulting assessment identified that a number of the concepts unsurprisingly
would need further investigation to determine an appropriate standard of design
provision.  
No consideration of the relative weighting of the evaluation criteria has been
undertaken. 
Page 353

Page 354

54 | P a g e
www.connectedtp.com 
Route /
Option
Length
(m)
Proposed Intervention
Structures
Required /
Altered 
1 High level of Service 10-14
2 Medium level of Service 15-23
3 Low level of Service 24-30
Costs
Deliverability
Accessibility
Local Need
Safety
Cohesiveness
Directness
Com
fort
Attractiveness
Adaptability
Total
Option 5 604 Reallocation of road space to suite new widened
footpath on inland side
no 1 1 1 1 2 1 1 2 1 1 12
Option B 245 Widen route and provide path on coastal side keeping
road as it is.  
no 2 2 1 1 2 1 1 2 1 1 14 Page 354

Page 355

55 | P a g e
www.connectedtp.com 
3.14 Considering Those with Protected Characteristics
An appraisal of the project has again been undertaken using ABC Social and
Equality Impact Appraisal template (SEQiA). The results of the assessment are
included in Appendix B.
Taking cognisance of the appraisals summarised previously it is noted that both
options would be provided to achieve a Cycle by Design ‘Medium standard’ of
provision.  
3.15 Considering Construction Phasing
Due to the overall route length and complexity of island delivery, it is highly
unlikely that the identified route corridor will be constructed as a single delivery
project.  It is more likely that the route will be delivered in a staged order as
funding becomes available.
Taking cognisance of the known challenges at this stage of the network
development, the following construction order is suggested. 
3.16 Recommendations and Next Steps
Following consideration of the material provided within this assessment, it is
recommended that the concept route is promoted and developed further during
the stage 3 design process.
The developed version will both reduce the unknown risks in the construction
costs and improve deliverability but will also align with key stakeholders’
requirements.
The design builds on the feedback provide by the community to focus less on
cycle provision, improve more opportunities to cross the road, improve parking
and address provision for overnight parking, coach and campervan parking.  The
concept improves connectivity between the Esplanade and the CalMac terminal
and promotes a direct route that benefits pedestrian and cyclists through the
town. 
Ref Route Section Route
Length(km)
Phase 1 Option 5 - Esplanade to Ferry Junction 0.58
Phase 2 Option B - Ferry Junction including Albert
Pier
0.25
Phase 3 Option B - Albert Pier to Route end 0.62
Page 355

Page 356

56 | P a g e
www.connectedtp.com  DESIGN PROCESS QUALITY AND INNOVATION
Page 356

Page 357

57 | P a g e
www.connectedtp.com 
4 DESIGN PROCESS QUALITY AND
INNOVATION
4.1 Outline Design Process
The project will be developed to align with the Places for Everyone (PfE) design
development programme.
4.2 Design Guidance and Quality
A wide range of design guidance and standards have been used to develop the
project proposals.  The core documents include: 
• Designing Streets;
• Cycling by Design (2021);
• The National Roads Development Guide (NRDG); and
• Inclusive Mobility (2021).
The detailed design process will use these standards and include:
• Design Manual for Roads and Bridges (DMRB);
• Traffic Signs and Regulations and General Directions (TSRDG);
• Local Transport Notes (LTN); and
• Traffic Advisory Leaflets (TAL).
These references represent the core design guidance however other documents
such as Sustrans Design Guidance Documents and other examples of best
practice have also been considered.  
Page 357

Page 358

58 | P a g e
www.connectedtp.com 
4.3 Considering Wider Area Improvements
The concept design process will include several key considerations in support of
the emerging network. These include:
• Improvement to accessibility, walking and cycling links between people
and place;
• Developing a signage and wayfinding strategy;
• Promoting a cycle-welcoming intervention;
• Introducing a Travel behaviour change programme; and
• Providing cycle parking and storage measures.
4.4 Considering Streetscape and Landscape Improvements
The route on its own will not create the maximum opportunity to support the
movement of people, create a place and encourage community ownership. 
Rothesay is a key service centre for the regional community which relies heavily
on the use of motorised travel to support the movement of the community.  
To support lasting change to travel behaviours the design process must include
placemaking potential giving priority to maximising the community’s assets and
access to public transport as well as the opportunity to walk and cycle while
retaining car-based access. 
4.5 Planting, Drainage and Local Environment
Within the proximity of any areas where there would be works such as seating,
way finders, and shared surfaces, planting of native species will enhance the
environmental improvements.  
Not only will planting create an attractive setting but it will also be encouraging
and increasing biodiversity. Salt-tolerant species can be used for foraging and can
be educational.  The changing seasons are marked with the advent of spring with
blossom flowers followed by autumn leaf colour changes. 
Page 358

Page 359

59 | P a g e
www.connectedtp.com 
4.6 Developing Streetscape
Sensitively designed rural street furniture and public art can be incorporated as
part of the concept design process and is aimed at enriching the experience of
everyday journeys and visits to the area.  
Whilst keeping in mind the coastal environment; seating, opportunities for
incidental play, and way-finders would be appropriate.
As a rural area with period style street lighting, the lighting design must be
provided very sensitively. Lighting can become a design feature in its own right,
by marking at ground level or by enhancing seating areas by incorporating
lighting into the structures. 
Paving materials will avoid any garish colours and patterns which would be more
associated with an urban area; again, as they are not in keeping with the style of
the road. The linear nature of the site naturally establishes a physical connection
through the site which can be punctuated with environmental improvements such
as seating areas and viewpoints. 
Examples of bike stands combined with seating
Examples of Bike Stands
Page 359

Page 360

60 | P a g e
www.connectedtp.com 
Example of Seating and Planting
Example of Route Signage
Example of Paving
Page 360

Page 361

61 | P a g e
www.connectedtp.com 
Examples of Rural Route Lighting Solutions
Page 361

Page 362

62 | P a g e
www.connectedtp.com 
Designing for Equality and Accessibility
The proposed Active Travel network must support access by all user groups and
include accessibility by all ages and abilities.  As the route corridor design
progresses, consideration must be given to ensuring that the network remains
safe and inviting to everyone.  This includes how those more vulnerable in our
society will be supported by the design.
The design is supported by a Social and Equalities Impact Assessment (SEQiA)
which is included in Appendix B.
4.7 Flood Prevention
With a changing climate, the importance of designing with flood risk in mind is
paramount.  The SEPA flood risk maps indicate that the route is not at risk of
1:200-year coastal flooding event.  A summary of the flood risk map is supplied
separately. 
4.8 Traffic Modelling
No traffic modelling is considered necessary at this stage of the concept
development. 
4.9 Preliminary Ecological Appraisal (PEA)
A Preliminary Ecological Appraisal has been undertaken for the existing route
corridor.  The PEA is supplied separately. 
Page 362

Page 363

63 | P a g e
www.connectedtp.com  PROJECT DELIVERABILITY AND DESIGN COLLABORATION
Page 363

Page 364

64 | P a g e
www.connectedtp.com 
5 PROJECT DELIVERABILITY AND DESIGN
COLLABORATION
5.1 Landownership
The project route is predominantly located within Argyll & Bute Council owned or
adopted lands.  There are no sections of the route where third-party land
ownership is expected to be required. 
Additional frontage landowners may need to be consulted at the next stage of the
design development depending on the route standard developed.
5.2 Designer Risk Register
Similar to the Project Risk Register, the Designer Risk Register provides a
summary of the risks and risk management associated with the technical delivery
of the design.  The Designer Risk Register is supplied separately.
5.3 Project Budget Forecast
A whole-life project forecast has been provided (Supplied separately).  
Page 364

Page 365

65 | P a g e
www.connectedtp.com  APPENDICES
Page 365

Page 366

66 | P a g e
www.connectedtp.com 
APPENDIX A – EXTENT OF APPROXIMATE COUNCIL OWNERSHIP 
Page 366

Page 367

67 | P a g e
www.connectedtp.com 
APPENDIX B – SOCIAL AND EQUALITY IMPACT ASSESSMENT (SEQIA)
Argyll and Bute Council: Equality and Socio-Economic Impact Assessment
Section 1: About the proposal  
Title of Proposal
Rothesay, Pavilion to Glenburn Road Walking and Cycling Improvement  
Description of Proposal
Stage 2 Concept design of a 1.45km Active Travel Route through Rothesay  
Purpose and Aims of Proposal
To provide safe walking and cycling route between Pavilion, Glenburn Road and local community services. To encourage everyday cycling and walking
as an alternative to private car use. To improve the island’s travel and mobility options. To improve access for those less able.  
Intended outcome of proposal
Concept design for the route aligned with the funding requirements of the Scottish Government active travel programme.  Intervention to be
proportionate and affordable to the communities requirements and maintain the islands character whilst providing infrastructure improvement.  
Business Outcome(s) / Corporate Outcome(s) / National Policies to which the proposal contributes/relates
Aligned with National and local policy interventions regarding promotion of sustainable travel modes, reduction in single journey car dependency.
Design reflects use of Cycle By Design 2021 update.  
Lead officer details: 
Page 367

Page 368

68 | P a g e
www.connectedtp.com 
Name of lead officer Colin Young
Job title Strategic Transportation Delivery Officer
Service / Company ABC
Contact Details colin.young@argyll-bute.gov.uk  
Appropriate officer details: 
Name of appropriate officer Colin Young
Job title Strategic Transportation Delivery Officer
Service / Company ABC
Contact Details colin.young@argyll-bute.gov.uk  
Sign off of EqSEIA
Approver Signature  
Approver Name  
Approver Job title  
Date of sign off  
Revision Number 1  
Who will deliver the proposal?
ABC Strategic Transportation Team  
Individuals involved in developing the EqSEIA 
Name Colin Young
Job title Strategic Projects Officer
Service / Company ABC
Contact Details colin.young@argyll-bute.gov.uk
Name Mark Rinkus
Job title Managing Director
Page 368

Page 369

69 | P a g e
www.connectedtp.com 
Service / Company Connected Transport Planning Ltd
Contact Details mark.rinkus@connectedtp.com
Name Jack Munro
Job title Engineer
Service / Company Narro Ltd
Contact Details jmunro@narroassociates.com 
Section 2: Evidence used in the course of carrying out EqSEIA     
Who does the proposal impact?
Will impact on everyone as it is a community asset and part of core infrastructure.  Key receptors include local frontage property owners, local residents
and visitors to the community     
Are there any aspects which explicitly address discrimination, victimisation or harassment?
No.  The project is a supporting element of infrastructure that will connect people with place.     
Are there any aspects which explicitly promote equal opportunities?
No.  Through good design aligned with current guidance and design standards, the project will be designed to support access by all user groups and
abilities.  Through appropriate design, the project will promote a safe environment for all user groups seeking to support the movement of people     
Are there any aspects which explicitly foster good relations?
Potential concerns regarding project location and route and the negative impact of unwanted construction and parking impacts     
Are there any aspects which explicitly promote socio-economic equality?
Page 369

Page 370

70 | P a g e
www.connectedtp.com 
No.  The project will contribute towards socio economic growth through better provision of a safer route between people and place     
Consultation / engagement undertaken
Consultation Details Date(s) Summary of Findings
Online via Facebook study page and community pages Various. See
Consultation Report Support for the project
Community visit x4 Various. See
Consultation Report Support for the project
Public Consultation x2 in including digital dial in workshop Various. See
Consultation Report
Support for the project. Some
landownership concerns
Local Community Primary School x1 Various. See
Consultation Report
Support for the project. 
Include colourful infrastructure
Local Community High School x1 Various. See
Consultation Report
Support.  No interest in play
equipment
LGBTQIA+ Pride community Various. See
Consultation Report Support for the project
Community Social Services x1 Various. See
Consultation Report
Support. Concerned relating to
speeding cyclists and cycle
priority scheme
General interactions with the community x10 Various. See
Consultation Report
Supportive. Concerns raised
relating to off-road routes
around rear of Rothesay
Regular steering group sessions Various. See
Consultation Report
Helped guide engagement with
the community     
Have people who identify with any protected characteristic(s) been involved in the development of the proposal?
Yes. Individuals would self-identified as having protected characteristics of age, sexual orientation, race and disability have engaged in the project     
Data Sources
Page 370

Page 371

71 | P a g e
www.connectedtp.com 
Census 2011 and 2022, 2019 previous engagement outputs, project traffic data (2023 off and on peak), community feedback     
Other information
Various design standards but primarily Cycle by Design 2021 update.     
What is known currently about the experience of people under each characteristic?
Protected characteristic What is currently known Source(s) Gaps in Evidence
Age
Including the experiences of young people
(age 18 and under) and older people.
Young adults live in the community and use a bus or
parent transport to get around.  Older populations
have expressed concerns regarding cycle priority vs.
pedestrian priority.  Kerbs, poor visibility, changes in
surface delineation are challenges to mobility. 
Ensuring older people do not need to step into the
cycle route and have sufficient time to hear an
oncoming cyclists. Particularly relevant for those
trying to cross the concept at points beyond the
allocated pedestrian crossings.
Meetings and
feedback with primary,
secondary schools. 
The general public
and through previous
project experience
such as conversations
with the RNIB.
none
Disability
Physical and mental. Including the
experiences of people with long term
limiting health conditions.
Older mobility challenged residents live in the
community.  They use mobility aids to get around. 
Changes in surface levels such as kerbing can limit
some people’s ability to physically move their bike. 
Those with hearing impairment have expressed
concerns regarding ability to hear and see oncoming
traffic or cyclists and have sufficient time to take
action
Face to face meeting
with residents in the
community and survey
feedback from the
public.  Previous
experience from other
projects.
none
Ethnicity
Including impact relating to skin colour,
nationality, language spoken and country
of origin. People identifying as Gypsy /
Travellers are protected by this
characteristic.
Some users from some ethnic groups have a view
that they may be more vulnerable to assault or
verbal abuse as members of particular ethnic
groups.  Safety concerns relate to the creation of
unsupervised spaces and places that might support
Online data search. 
Points shared through
design team
conversation
No empirical evidence to
support what might be a
generalised viewpoint. 
Feedback reflects subjective
view of some individuals and
Page 371

Page 372

72 | P a g e
www.connectedtp.com 
intimidating behaviour by some individuals. 
Promotion of natural surveillance and appropriate
lighting is important to inclusive / welcoming design.
Challenges also relate to signage and language
barriers. 
may not reflect the group
overall.  Not all ethnic groups
surveyed or viewpoints have
been recorded so there is a
high risk of generalisation.
Sex
Some user groups feel they are unsafe passing
through or along spaces which is less well lit. 
Appropriate levels of  lighting and natural
surveillance can help address these perceptions.
Online data search. 
Points shared through
design team
conversation.
No evidence to support what is
likely to be a personal view
held by the individual.  No
safety concerns relating to sex
have been received via the
community survey.
Gender reassignment
Where someone is living part / full time as
the opposite gender to their assigned sex
at birth.
Some user groups suffering from gender dysphoria
may feel they are unsafe or more vulnerable to
attack when passing through or along spaces which
are less well lit.  Appropriate levels of  lighting and
natural surveillance can help address these
perceptions.
Online data search. 
Points shared through
design team
conversation.
No evidence to support what is
likely to be a personal view
held by the individual.  No
safety concerns relating to
gender have been received via
the community survey.
Marriage and Civil Partnership
Some male or females living together out with
marriage or in a civil partnership may feel less
secure  or victimised by other people using the travel
route. This perception of risk may be the result of
religious belief.
No data available.
No evidence to support what is
likely to be a personal view
held by the individual.  No
safety concerns relating to
marital status have been
received via the community
survey.
Pregnancy and Maternity
This covers women as soon as they
become pregnant. In the workplace this
includes pregnancy-related illness. When
a woman gives birth or is breastfeeding,
this characteristic protects them for 26
weeks.
Parents in the community do walk the project route
but numbers are proportionately lower.  Use of
private car is preferred for ease and convenience
noting the  space between places, weather and
concerns have been raised regarding shared use of
the road and safety challenges of maintaining
access for those reliant upon car use.
Face to face meeting
with residents in the
community and survey
feedback.
Few participating parents to
provide comment by anecdotal
evidence provided from wider
island community
Page 372

Page 373

73 | P a g e
www.connectedtp.com 
Religion / Belief
Including the experiences of people with
no religion or belief.
Some user groups have a view that they may be
more  vulnerable to assault or verbal abuse as
members of particular religious groups.  Safety
concerns relate to the creation of unsupervised
spaces and places where would anti-social activity
might take place.  Promotion of natural surveillance
and appropriate lighting is important to inclusive
design. There are multiple churches on the island
supports some religious groups and can be
accessed via the road.
Online data search. 
Points shared through
design team
conversation
No empirical evidence to
support what might be a
generalised viewpoint. 
Feedback reflects subjective
view of some individuals and
may not reflect the group
overall.  Not all religious
groups surveyed or viewpoints
have been recorded so there is
a high risk of generalisation.
Sexual Orientation
Some people can feel they are unsafe passing
through or along spaces which they believe they
have less than appropriate lighting and natural
surveillance.  In these situations their perception of
risk due to verbal or physical assault is elevated. 
The inclusion of spaces with limited natural
surveillance can also present opportunities to
individuals with protected characteristics.
Online data search. 
Points shared through
design team
conversation.
No evidence to support what is
likely to be a personal view
held by the individual.  No
safety concerns relating to
sexual orientation have been
received via the community
survey.
Other marginalised groups
Including but not exclusive to the
experiences of unpaid carers, homeless
people, current and ex-offenders, people
with addictions, care experienced people,
people living in rural areas.
Some people from some marginalised groups have a
view that they may be more  vulnerable to assault or
verbal abuse as members of particular marginalised
groups.  Safety concerns relate to the creation of
unsupervised spaces and places where anti-social
behaviour might occur.  Promotion of natural
surveillance and appropriate lighting is important to
inclusive design. As a rural community the distance
and acceptance of the challenge of access to
everyday services is considerably greater than that
on the mainland. 
Online data search. 
Points shared through
design team
conversation
No empirical evidence to
support what might be a
generalised viewpoint. 
Feedback reflects subjective
view of some individuals and
may not reflect the group
overall.  Not all marginalised
groups surveyed or viewpoints
have been recorded so there is
a high risk of generalisation.
Cross Cutting
Where two or more characteristics overlap
and the proposal affects those people in a
specific way
The project will support access to improved walking
and cycling travel.  The promotion of walking is at
odds with the needs of cyclists and vice versa. 
Some user groups are at 'odds' with the needs of
local drivers who wish to access places quickly. 
Conversations and
Community feedback.
Conversations and Community
feedback.
Page 373

Page 374

74 | P a g e
www.connectedtp.com 
These needs are in turn at 'odds' with the actions of
tourists  arriving on the island by private car.   
What is currently known Source(s) Gaps in Evidence
Mainland rural population
The island co-exists through a dependency with the
mainland through the passenger ferry service. 
Access to Rothesay is via car, ferry and bus service
provides support.  The equality challenges are
typical to those associated with rural island living.
Community
conversations. 
Census and
Placemaking tool
results.
No gaps identified.
Island populations
The community consists of many people who live
throughout the area, have many different aspects of
travel with no difficulty.
Community
conversations. 
Census and
Placemaking tool
results
No gaps identified
Low income
There is no single definition or measure of
low income. Some indicators suggest that
low income is where individuals living in
households receive below 60% of UK
median income. Scottish Government’s
Children in Families With Limited
Resources Across Scotland 2014-2016
defines low income as ‘household income
below 70% of the Scottish median after
housing cost’.
Access to travel is not a challenge for Rothesay. The
movement of goods and services are often at a
higher comparable cost to the mainland.  This cost
disparity can exacerbate difference in wealth, health
and welfare.
Online research.
Published research no gaps identified
Low wealth
Not having access to wealth (including for
example, financial products, equity from
housing, decent pension, accessible
saving). People who have low wealth lack
protection from socio-economic
disadvantage.
Access to travel is not a challenge for the
community.  The movement of goods and services is
often at a higher comparable cost to the mainland. 
This cost disparity can exacerbate difference in
wealth, health and welfare.
Online research.
Published research. No gaps identified
Page 374

Page 375

75 | P a g e
www.connectedtp.com 
Material deprivation
Inability to access basic goods and
services.
Access to travel is a challenge for rural communities
and remote communities.  The movement of goods
and services is often at a higher comparable cost to
the mainland.  This cost disparity can exacerbate
difference in wealth, health and welfare.
Census and place
standard tool feedback None
Area deprivation
Areas where there are concentrations of
deprived households.
Access to travel is not a challenge for area
deprivation as many residents own cars and drive
quite often, some areas also have bus stops which
can pass in and out of Rothesay.
Online research.
Published research No gaps identified
Socio-economic background
Relates to the context in which a person
has been raised or in which they live.
Disadvantage may arise from parents’
education, employment and income
(social class).
Access to travel is a challenge for rural communities
and remote communities.  The movement of goods
and services is often at a great comparable cost to
the mainland.  This cost disparity can exacerbate
difference in wealth, health and welfare.
Online research.
Published research. No gaps identified
Communities of place
Refers to people who are bound together
because of where they live, work, visit, or
otherwise spend a continuous portion of
their time. This may include rural, remote
and island areas.
Challenges associated with community living
including higher car dependency and cost of living
Census and place
standard tool
feedback.
None 
Section 3: Impact of proposal         
Impact on service users
Protected
characteristic Negative No Impact Positive   Don’t Know
Action
required
for impact
be known  
Details
(incl. action taken to
minimise negative and/or
maximise positive impact)
Age
Including the
experiences of
young people (age   
Any proposal
will have
some
positive and
Consider
user group
design
separation  
Many of the communities
younger generation are
independently mobile.  The
travel distances in the
Page 375

Page 376

76 | P a g e
www.connectedtp.com 
18 and under) and
older people.
negative
challenges
to people of
different
ages and
abilities. 
Overall, the
proposal
wont
prioritise one
age group
over another
if space
allows
community between places
mean travel by car is the only
practical option even though
many of the children show a
willingness to walk and cycle
and do walk and cycle
regularly. Personal safety is not
currently a community concern
with some of the younger adults
often cycling and walking
during the hours of darkness. 
The more mature generation
has expressed concerns
relating to accessibility
challenges, noting the limited
road width and loss of access
through changes to parking. 
Steep gradients should be best
minimised or avoided.  Cycle
speeds can be intimidating
(particularly e-bikes) to some
older people and measures to
clarify the priority of the route to
pedestrians and provide cycle
speed control measures cannot
yet be effectively managed.
The concept will seek to
minimise road crossings by
keeping the route on the same
side of the carriageway as
much as reasonably
practicable.    The design
includes additional benches as
requested by the community to
Page 376

Page 377

77 | P a g e
www.connectedtp.com 
provide more frequent rest
opportunities for the less able-
bodied noting the overall length
of the route is around 1.45km.
The design does include for
user segregation meaning that
multiple user groups which will
address some of these
challenges but will create other
challenges for crossing the
route beyond the allocated
crossing points.  No additional
play areas are promoted as the
community did not identify them
as preference.  Lighting is
provided via existing street
lighting.
Disability
Including the
experiences of
people with long
term limiting health
conditions.        
Any proposal
will have
some
positive and
negative
challenges
to people of
different
abilities. 
Overall, the
proposal will
be a net
improvement 
overall as it
provides
infrastructure
where there
Consider
user group
design
separation.
Install
measures
to manage
cyclist
speeds.  
We have considered
accessibility by those less able,
noting the design is a shared
use path which supports
segregation of user groups. By
using the existing road route we
have avoided steep or lengthy
inclines and declines which
keeps the route accessible by
the mobility impaired. We have
ensured pedestrian priority in
the project as far as possible
with the route changes seeking
to provide a more coherent and
continual route.  This is
achieved by removing
Page 377

Page 378

78 | P a g e
www.connectedtp.com 
is currently 
none
vegetation and improving
sightlines.    
Ethnicity
Including impact
relating to skin
colour, nationality,
language spoken
and country of origin.
People identifying as
Gypsy / Travellers
are protected by this
characteristic.  
The route concept includes
good practice design to
minimise people accessing
dark or unwelcoming spaces
that might discourage use
by some user groups. 
However, the island is a
remote community and
much of the route does not
benefit from natural
surveillance          
The ethnicity of the population
in the community is Scottish /
white.  The spoken language is
English and Gaelic.  Route
signage will be provided  bi-
lingual. The route is being
designed to support access by
all races and we are unaware
of any design features that
would influence users within
this category.  There are no
published details of  path
design considerations relevant
to race that are not equally as
relevant to other user group
criterion.
Sex  
The route concept includes
good practice design to
minimise people accessing
dark or unwelcoming spaces
that might discourage use
by some user groups. 
However, the island is a
remote community and
much of the route does not
benefit from natural
surveillance          
The concept design supports
mobility by all user groups.  The
route design is promoted to
support mobility by an
unaccompanied 12 year old. 
We are not aware of any design
criterion relevant to path design
that is unique to this category. 
Page 378

Page 379

79 | P a g e
www.connectedtp.com 
Gender
reassignment
Where someone is
living part / full time
as the opposite
gender to their
assigned sex at birth.  
The route concept includes
good practice design to
minimise people accessing
dark or unwelcoming spaces
that might discourage use
by some user groups. 
However, the island is a
remote community and
much of the route does not
benefit from natural
surveillance.          
The concept design supports
mobility by all user groups.  The
route design is promoted to
support mobility by an
unaccompanied 12 year old. 
We are not aware of any design
criterion relevant to path design
that is unique to this category. 
We also note participation of
two individuals within the
community feedback who suffer
from gender dysphoria and
inclusion of Bute Pride within
the concept design
consultation.
Marriage and Civil
Partnership       
Not
measurable.      
Pregnancy and
Maternity
This covers women
as soon as they
become pregnant. In
the workplace this
includes pregnancy-
related illness. When
a woman gives birth
or is breastfeeding,
this characteristic
protects them for 26
weeks.    
The
separation of
user groups to
provide a
level-priority
walking route
that is not
shared with
vehicles will
improve the
projects
attractiveness.        
The concept design supports
mobility by all user groups.  The
route design is promoted to
support mobility by an
unaccompanied 12 year old.   
Page 379

Page 380

80 | P a g e
www.connectedtp.com 
Religion / Belief
Including the
experiences of
people with no
religion or belief.  
The intervention will include
good practice design to
minimise provision of dark or
unwelcoming spaces that
might discourage use by
some user groups. 
However, the area is a
remote community and
much of the project does not
benefit from natural
surveillance.          
The concept design supports
mobility by all user groups.  The
route design is promoted to
support mobility by an
unaccompanied 12 year old.  
The route will continue to be
available to persons of any
religion or belief. The location
of the route nearer the coast
may appeal to some individuals
with a religious belief rooted in
nature.
Sexual Orientation                
Other marginalised
groups
Including but not
exclusive to the
experiences of
unpaid carers,
homeless people,
current and ex-
offenders, people
with addictions, care
experienced people,
people living in rural
areas.  
The intervention will include
good practice design to 
minimise provision of dark or
unwelcoming spaces that
might discourage use by
some user groups. 
However, the area is a
remote community and
much of the project does not
benefit from natural
surveillance.          
The concept design supports
mobility by all user groups.  The
route design is promoted to
support mobility by an
unaccompanied 12 year old.   
Cross Cutting
Where two or more
characteristics
overlap and the
proposal affects
those people in a
specific way  
Conflicts between cyclists,
pedestrians and vehicles.          
The standard of design
includes a low level of provision
narrow but segregated cycle
route.  User groups are
expected to interact sensibly. 
This may present a risk to
some user groups such as the
older and less able who have
difficulty in hearing oncoming
Page 380

Page 381

81 | P a g e
www.connectedtp.com 
vehicles or cyclists.  The design
will include some basic
wayfinding signage that should
seek to reinforce pedestrian
priority. The route has a high
level of coherence making it
easier for  groups to navigate
between and across sections.
At these locations, user conflict
risk is increased.  There is little
can be done from a design
perspective to manage user
group behaviours.  It is also
noted that visiting drivers can
often choose to arrive by car
and place continued strain on
available community parking.  
Fairer Scotland Duty
Mainland rural
population                
Island populations   x            
Page 381

Page 382

82 | P a g e
www.connectedtp.com 
Low income
There is no single
definition or measure
of low income. Some
indicators suggest
that low income is
where individuals
living in households
receive below 60%
of UK median
income. Scottish
Government’s
Children in Families
With Limited
Resources Across
Scotland 2014-2016
defines low income
as ‘household
income below 70%
of the Scottish
median after housing
cost’.    
Improved
access to
services will
address the
challenges
noted through
the SIMD and
Place scoring
tool.        
Accessible routes will support
the movement of people on all
points of the social scale.  The
routes should provide some
support to social interaction
between the community. During
the stage 1 engagement, it was
noted that promotion on a route
along the existing road corridor
would be preferred as it is
within this space that the
majority of the communities
social engagement occurs.
Whilst no data is known about
low income families within the
community the principle of
providing improved access to
people to place by improved
sustainable travel options is
known to support individuals
from all income abilities.
Low wealth
Not having access to
wealth (including for
example, financial
products, equity from
housing, decent
pension, accessible
saving). People who
have low wealth lack
protection from
socio-economic
disadvantage.    
Improved
access to
services will
address the
challenges
noted through
the SIMD and
Place scoring
tool.        
Accessible routes will support
the movement of people on all
points of the social scale. The
route may support new
business opportunities through
tourist cycling groups which
could contribute to wealth
creation. Whilst the route is not
directly linked to wealth it is
again supportive of wealth
creation.
Page 382

Page 383

83 | P a g e
www.connectedtp.com 
Material
deprivation
Inability to access
basic goods and
services.  
Intervention is unlikely to
create a significant enough
impact to address the areas
overall rural remoteness and
the cost of living in a
community.          
The intervention is unlikely to
create a significant enough
impact to address the areas
overall rural remoteness and
the cost of living in a
community.  The route links
Rothesay's pavilion to Glenburn
Road which might provide
some betterment to the
communities located to the
West or East of Rothesay
noting these residents will still
need to travel to Rothesay to
access goods and services in
any case.  The route will not
provide any improvement to the
location of services but may
accessing services more
comfortable.
Area deprivation
Areas where there
are concentrations of
deprived
households.  
Intervention is unlikely to
create a significant enough
impact to address the areas
overall rural remoteness and
the cost of living in a
community.          
Intervention is unlikely to create
a significant enough impact to
address the areas overall rural
remoteness and the cost of
living in a community.
Page 383

Page 384

84 | P a g e
www.connectedtp.com 
Socio-economic
background
Relates to the
context in which a
person has been
raised or in which
they live.
Disadvantage may
arise from parents’
education,
employment and
income (social
class).    
Improved
access to
services will
address the
challenges
noted through
the SIMD and
Place scoring
tool.        
Accessible routes will support
the movement of people on all
points of the social scale.
Communities of
place
Refers to people who
are bound together
because of where
they live, work, visit,
or otherwise spend a
continuous portion of
their time. This may
include rural, remote
and island areas.    
Improved
access to
services will
address the
challenges
noted through
the SIMD and
Place scoring
tool.        
Accessible routes will support
the movement of people on all
points of the social scale.  The
route should support social
interaction between the
community. The route will be
located along the existing road
as promoted by the community.
This will continue to support
community social interaction
and maintain a community
connection with the residents.
Communities of
interest
Refers to groups of
people who share an
identity or an
experience. They do
not need to live in
the same area,
however.    
Improved
access to
services will
address the
challenges
noted through 
the SIMD and
Place scoring
tool        
n/a
Page 384

Page 385

85 | P a g e
www.connectedtp.com 
If you have identified any impacts on service users, explain what these will be.           
Impact on service deliverers (including employees, volunteers etc)
Protected characteristic Negative No Impact Positive   Don’t Know
Action
required
for impact
be known  
Details
(incl. action taken to minimise
negative and/or maximise
positive impact)
Age
Including the experiences of young
people (age 18 and under) and older
people.  
x           As per Service Users.
Disability
Including the experiences of people
with long term limiting health
conditions.  
x           As per Service Users.
Ethnicity
Including impact relating to skin colour,
nationality, language spoken and
country of origin. People identifying as
Gypsy / Travellers are protected by
this characteristic.  
x           As per Service Users.
Sex   x           As per Service Users
Gender reassignment
Where someone is living part / full time
as the opposite gender to their
assigned sex at birth.  
x           As per Service Users.
Marriage and Civil Partnership   x           As per Service Users.
Page 385

Page 386

86 | P a g e
www.connectedtp.com 
Pregnancy and Maternity
This covers women as soon as they
become pregnant. In the workplace
this includes pregnancy-related illness.
When a woman gives birth or is
breastfeeding, this characteristic
protects them for 26 weeks.  
x           As per Service Users.
Religion / Belief
Including the experiences of people
with no religion or belief.  
x           As per Service Users.
Sexual Orientation   x           As per Service Users.
Other marginalised groups
Including but not exclusive to the
experiences of unpaid carers,
homeless people, current and ex-
offenders, people with addictions, care
experienced people, and people living
in rural areas.  
x           As per Service Users.
Cross Cutting
Where two or more characteristics
overlap and the proposal affects those
people in a specific way  
x           As per Service Users.
Fairer Scotland Duty
Mainland rural population   X           As per Service Users.
Island populations   x           As per Service Users.
Low income
There is no single definition or
measure of low income. Some
indicators suggest that low income is
where individuals living in households
receive below 60% of UK median
income. Scottish Government’s
Children in Families With Limited
Resources Across Scotland 2014-
2016 defines low income as  
x           As per Service Users.
Page 386

Page 387

87 | P a g e
www.connectedtp.com 
‘household income below 70% of the
Scottish median after housing cost’.
Low wealth
Not having access to wealth (including,
for example, financial products, equity
from housing, decent pension,
accessible saving). People who have
low wealth lack protection from socio-
economic disadvantage.  
x           As per Service Users
Material deprivation
Inability to access basic goods and
services.  
x           As per Service Users.
Area deprivation
Areas where there are concentrations
of deprived households.  
x           As per Service Users.
Socio-economic background
Relates to the context in which a
person has been raised or in which
they live. Disadvantage may arise from
parents’ education, employment and
income (social class).  
x           As per Service Users.
Communities of place
Refers to people who are bound
together because of where they live,
work, visit, or otherwise spend a
continuous portion of their time. This
may include rural, remote and island
areas.  
x           As per Service Users.
Communities of interest
Refers to groups of people who share
an identity or an experience. They do
not need to live in the same area,
however.  
x           As per Service Users. 
Page 387

Page 388

88 | P a g e
www.connectedtp.com 
Section 4: Interdependencies  
Is this proposal likely to have any knock-on effects for any other activities carried out by or on behalf of the Council?
No  
Details of knock-on effects identified.
None 
Select the overall assessment result, 1-4, which applies
Overall Assessment Result Justification
No major change
If this is selected you are confirming that the EqSEIA demonstrates the proposal is
robust and there is no possible adverse impact.
n/a
Continue the proposal
If this is selected you are confirming that the EqSEIA identifies possible adverse impact
or missed opportunities but the proposal can be justified.
At this early stage, the project options can be developed to provide
a positive influence on all user groups within the community. 
Consideration of a project alignment which supports access by
those less able will increase the interventions attractiveness for use
by a wider audience.
Adjust the proposal
If this is selected you are confirming that the EqSEIA identifies possible adverse impact
or missed opportunities which suggest the proposal needs to be adjusted.
n/a
Stop and remove the proposal
The proposal shows actual or possible unlawful discrimination. It must be halted or
significantly changed.
n/a   
High Level Amendments made to Proposal due to EqSEIA
Page 388

Page 389

89 | P a g e
www.connectedtp.com 
Protected characteristic Specific Adjustments
made due to EqSEIA Lessons Learned
Age
Including the experiences of young people (age 18 and under) and older people. None n/a
Disability
Including the experiences of people with long term limiting health conditions. None n/a
Ethnicity
Including impact relating to skin colour, nationality, language spoken and country of
origin. People identifying as Gypsy / Travellers are protected by this characteristic.
None n/a
Sex None n/a
Gender reassignment
Where someone is living part / full time as the opposite gender to their assigned sex at
birth.
None n/a
Marriage and Civil Partnership None n/a
Pregnancy and Maternity
This covers women as soon as they become pregnant. In the workplace, this includes
pregnancy-related illness. When a woman gives birth or is breastfeeding, this
characteristic protects them for 26 weeks.
None n/a
Religion / Belief
Including the experiences of people with no religion or belief. None n/a
Sexual Orientation None n/a
Other marginalised groups
Including but not exclusive to the experiences of unpaid carers, homeless people,
current and ex-offenders, people with addictions, care experienced people, people
living in rural areas.
None n/a
Cross Cutting
Where two or more characteristics overlap and the proposal affects those people in a
specific way.
None n/a
Fairer Scotland Duty 
Mainland rural population None n/a
Page 389

Page 390

90 | P a g e
www.connectedtp.com 
Island populations None n/a
Low income
There is no single definition or measure of low income. Some indicators suggest that
low income is where individuals living in households receive below 60% of the UK
median income. Scottish Government’s Children in Families With Limited Resources
Across Scotland 2014-2016 defines low income as ‘household income below 70% of
the Scottish median after housing cost’.
None n/a
Low wealth
Not having access to wealth (including for example, financial products, equity from
housing, decent pension, accessible saving). People who have low wealth lack
protection from socio-economic disadvantage.
None n/a
Material deprivation
Inability to access basic goods and services. None n/a
Area deprivation
Areas where there are concentrations of deprived households. None n/a
Socio-economic background
Relates to the context in which a person has been raised or in which they live.
Disadvantages may arise from parents’ education, employment and income (social
class).
None n/a
Communities of place
Refers to people who are bound together because of where they live, work, visit, or
otherwise spend a continuous portion of their time. This may include rural, remote and
island areas.
None n/a
Communities of interest
Refers to groups of people who share an identity or an experience. They do not need
to live in the same area, however.
None n/a 
Section 6: Monitoring and Review   
How will the equality and socio-economic impacts of the proposal be monitored and evaluated?
Page 390

Page 391

91 | P a g e
www.connectedtp.com 
Update the SEQiA at the next stage of the project once the design is developed.   
Action to be taken to: Provide a best practice design
• Mitigate possible negative impact(s) (listed under Section 3);
• Promote possible positive impact(s) and;
• Gather further information or evidence.
Action Lead Timescale                                 
When is the proposal due to be reviewed?
Jul-25 
Page 391

Page 392

This page is intentionally left blank

Page 393

1
ARGYLL AND BUTE COUNCIL BUTE AND COWAL AREA
COMMITTEE
CUSTOMER SUPPORT SERVICES 3 JUNE 2025
AREA PERFORMANCE REPORT – FQ4 2024/25
1.0 BACKGROUND
1.1 This paper presents the Area Performance Report for Financial Quarter 4 2024/25
(January – March 2025) and illustrates the agreed performance measures.
1.2 The features of the Performance Report are as follows:-
 Indicators are grouped by Corporate Outcome.
 The data table for each indicator is colour coded to identify the level of
reporting.
o Area level measures are blue
o Council level measures are grey
o COI measures are white
 Each indicator details the
o Target, Actual and Performance status (Green / Red / No Target) for the
current and four previous financial quarters.
o Commentary for the current financial quarter only.
o Narrative explaining the performance trend e.g. This indicator is above
Target and performance has improved since the last reporting period.
o Where appropriate a Performance Trend Line has been added.
o The name of the Responsible Officer.
o Where possible performance is presented at both Area and Council
level.
1.3 The commentary for each indicator helps ‘Tell Our Story’ and enables Elected
Members to put the performance data into perspective and understand if an issue is
local in nature or should be escalated up to a Strategic Committee. 
1.4 As part of our improvements to performance reporting and making best use of the
digital technology available to us, the information contained in this report is also
available in your online scorecard which can be accessed via the Members area
on The Hub. If support is required to navigate the online scorecard, please contact
lorna.gillies@argyll-bute.gov.uk
1.5 To improve the response to performance queries, it is requested that should there
be any queries that either the Responsible Person or Kay Owen are contacted.
This should enable some queries being resolved or clarified prior to the Area
Committee meeting, and therefore being carried forward as Actions at a
subsequent meeting.
Page 393 Agenda Item 10

Page 394

2 
2.0 RECOMMENDATIONS
2.1 It is recommended that the Area Committee –
a) Notes and considers the performance and supporting commentary as
presented.
3.0 IMPLICATIONS
3.1 Policy All of the indicators in this report are based on 
agreed Council policy.
3.2 Financial All indicators with financial implications are actively
managed through agreed budget monitoring 
processes.
3.3 Legal All appropriate legal implications are complied with.
3.4 HR All HR implications are actively managed  
through agreed Wellbeing and Management 
monitoring processes.
3.5 Fairer Scotland Duty See below.
3.5.1 Equalities All activities comply with Equal Opportunities/Fairer
Scotland Duty policies and obligations.
3.5.2 Socio-economic Duty All activities comply with the council’s socio- 
economic duty.
3.5.3 Islands Duty All activities comply with the council’s islands
duty.
3.6 Climate Change The Council is committed to working towards net 
zero.
3.7 Risk Without this information Elected Members are less
informed of activities within their area.
3.8 Customer Service All activities with customer feedback or insight are
rigorously monitored for improvement.
3.9 The Rights of the Child This report highlights examples of how the Council is
(UNCRC) committed to, and working towards reducing child
poverty and improving outcomes for every child.  
Kirsty Flanagan, Executive Director with responsibility for Customer Support
Services
Jane Fowler
Head of Customer Support Services
8 May 2025
For further information, please contact:
Kay Owen
Team Lead - Organisation Development Project Office - Customer Support Services
01546 604073
Appendix 1: FQ4 2024/25 B&C Performance Report
Page 394

Page 395

#
Indicator Responsible Person Reported Page
COI - Maximise distribution of Scottish Welfare Fund Fergus Walker A&B only 3
COI - Percentage of clients satisfied that they are better able to deal with their financial problems following
our support and intervention Lee Roberts A&B only 4
Number of parking penalty notices issued Hugh O'Neill Area 5
Car parking income to date (cumulative) Hugh O'Neill Area 6 - 7
Number of dog fouling complaints Tom Murphy Area 8
COI - Increase the percentage of our care experienced young people that have the recommended additional
tracking and monitoring plans in place Louise Chisholm A&B only 9
COI - Provide quality meals within cost margins to all pupils Christine Boyle A&B only 10
Maximise the percentage of 16-19 year olds participating in education, training or employment Jennifer Crocket Area 11
2024/25 FQ4 Bute and Cowal Performance Report
The information presented is a summary of the agreed measures.
Unless stated otherwise, performance is presented at both Area and Council-wide levels.
The measure shows the performance against target for the current previous three reporting periods with an explanation of performance trend.
Where appropriate a trend line has been added to illustrate movement in 'Actual' over the reporting period.
Corporate Outcome: People live active, healthier and happier lives
Corporate Outcome: People live in safer and stronger communities
Corporate Outcome: Children and young people have the best possible start
Corporate Outcome: Education, skills and training maximises opportunities for all
Page 395

Page 396

#
Indicator Responsible Person Reported Page
Number of affordable social sector new builds completed per annum Kelly Ferns Area 12
Percentage of pre-planning application enquiries processed within 20 working days Peter Bain Area 13 - 14
Average number of weeks to determine householder planning applications Peter Bain Area 15 - 16
COI - Number of new homeless applicants who required temporary accommodation this period Morven Macintyre A&B only 17
COI - Maintain the percentage of local suppliers that benefit from the award of contracts via the procurement
portal Anne MacColl-Smith A&B only 18
COI - Increase the number of community benefits that are delivered through contracts we award locally Anne MacColl-Smith A&B only 19
Percentage of street lighting faults repaired within 10 days Tom Murphy Area 20
Number of waste collection complaints Tom Murphy Area 21 - 22
COI (part) - Percentage of waste recycled, composted and recovered John Blake Area 23 - 24
COI - Number of tonnes of waste sent to landfill John Blake A&B only 25
COI - LEAMS (Local Environment Audit and Management System) Tom Murphy Area 26 - 27
COI - Teacher sickness absence Jennifer Crocket (B&C and MAKI)
Wendy Brownlie (H&L and OLI) Area 28
COI - LGE staff (including non-Teacher) sickness absence Carolyn Cairns Area 29
COI - Increase the percentage of all self-service automated contacts Robert Miller A&B only 30
Corporate Outcome: We have an infrastructure that supports sustainable growth
Corporate Outcome: Making it happen
Corporate Outcome: Our economy is diverse and thriving
Page 396

Page 397

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B 95.3% 78.0% -17.3% Red - Actual
below Target
As at 31 March 2025, our expenditure for the year stands at £549,136. This represents an underspend of £159,148 of our
budgeted profiled amount. Comparing 2024/25 to 2023/24 we received 357 less applications for support and spend was
£113,014 less. This decline is part of a broader trend observed across Scotland. Recent statistics up to September 2024
indicate a general decrease in both applications and spending on SWF, encompassing both Crisis Grants and Community Care
Grants.
Period Actual FQ3 Commentary
2023/24 FQ4 128.6%
2024/25 FQ1 94.0%
2024/25 FQ2 72.9%
2024/25 FQ3 79.7%
2024/25 FQ4 78.0%
Corporate Outcome - People live active, healthier and happier lives
COI - Maximise distribution of Scottish Welfare Fund
Responsible Person: Fergus Walker
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ4 is lower than the target and performance has decreased since the last reporting period.
Actual trend line
As at 31 December 2024 , our expenditure stands at £423,302.  This represents an underspend of £107,914 of our budgeted
profiled amount.  To date the number of applications is down by 10% compared to the same period last year, however the
average award amount has increased by almost £50.  As in previous years we expect an increase in both applications and
awards in the final quarter of this year.
3
Page 397

Page 398

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B 100% 100% 0% Green - Actual
meets Target
This is a voluntary survey with no obligation for clients to respond either in full or in part. It is also common for incomplete
returns to be received. In FQ4 2024/25, 11 survey forms were distributed to clients. 10 were returned. Of these 10 returns, 7
responded to the question relating to being better able to deal with their financial problems. Of these 7 respondents, 7
responded positively, whilst 0 responded negatively. Accordingly, 100% of clients that responded were positive about their
experience i.e. no negative comments or responses were reported.
Period Actual FQ3 Commentary
2023/24 FQ4 100%
2024/25 FQ1 100%
2024/25 FQ2 100%
2024/25 FQ3 100%
2024/25 FQ4 100%
Actual trend line
This is a voluntary survey with no obligation for clients to respond either in full or in part. It is also common for incomplete
returns to be received. In FQ3 2024/25, 17 survey forms were distributed to clients. 9 were returned. Of these 9 returns, 8
responded to the question relating to being better able to deal with their financial problems. Of these 8 respondents, 8
responded positively, whilst 0 responded negatively. Accordingly, 100% of clients that responded were positive about their
experience i.e. no negative comments or responses were reported.
Corporate Outcome - People live active, healthier and happier lives
COI - Percentage of clients satisfied that they are better able to deal with their financial problems following our support and intervention
Responsible Person: Lee Roberts
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ4 meets the target with no change in performance since the last reporting period.
4
Page 398

Page 399

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 B&C No Target 313 N/A N/A Deterioration of lining in town centres continues to affect enforcement/traffic management.  Transport (Scotland) Act
prohibitions (pavement parking, dropped kerb & double parking) enforcement began on March 3rd.
Period Actual FQ3 Commentary
2023/24 FQ4 214
2024/25 FQ1 251
2024/25 FQ2 195
2024/25 FQ3 245
2024/25 FQ4 313
2024/25 FQ4 A&B No Target 1,253 N/A N/A
Recruitment and training of two new Amenity Wardens has resulted in them beginning enforcement through the quarter in
MAKI & H&L, tempered by loss of Warden in H&L area.  Transport (Scotland) Act prohibitions (pavement parking, dropped
kerb & double parking) enforcement began on March 3rd.
Period Actual FQ3 Commentary
2023/24 FQ4 1,196
2024/25 FQ1 1,763
2024/25 FQ2 2,302
2024/25 FQ3 968
2024/25 FQ4 1,253
Corporate Outcome - People live in safer and stronger communities
Number of parking penalty notices issued
Responsible Person: Hugh O'Neill
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ4 shows the number of parking penalty notices has increased since the last reporting period.
Actual trend line
Increase from last quarter and up compared to previous year FQ3.  The "off-season" has allowed the B&C warden to focus
locally.
This indicator for FQ4 shows the number of parking penalty notices has increased since the last reporting period.
Actual trend line
Decrease on previous FQ3 but within general range.
5
Page 399

Page 400

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 B&C £70,174 £67,957 -£2,217 Red - Actual
below Target Under-recovery of £2k over the year.  No obvious reason for this although it represesents only a 3% variance.
Period Target Actual FQ3 Commentary
2023/24 FQ4 £86,511 £64,271
2024/25 FQ1 £16,755 £7,755
2024/25 FQ2 £36,887 £35,543
2024/25 FQ3 £55,259 £47,925
2024/25 FQ4 £70,174 £67,957
£1,446
£2,173
£2,456
£1,053
£4,870
£2,242
£5,792
£0
£20,032
Corporate Outcome - People live in safer and stronger communities
Car parking income to date (cumulative)
Responsible Person: Hugh O'Neill
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ4 shows the cumulative amount of income is lower than the cumulative target.
Dunoon Pier
Moir Street,Dunoon
Argyll Street, Dunoon
Jane Villa, Dunoon
B&C
Total
Actual trend line
There is no trend as this data is
cumulative as of FQ1 each financial year.
The poor weather during FQ3 may have impacted vistor numbers.  The waiving of charges for winter festivals and the free
parking over the festive period may have had a detrimental impact on income.
Income Collected During FQ4
Guildford Square, Rothesay
Church Street, Dunoon
Swimming Pool, Dunoon
6
Page 400

Page 401

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B £963,049 £1,011,360 £48,311 Green - Actual
exceeds Target
Income has exceeded forecast.  This may be due to focussed enforcement within the areas by the wardens, including the two
new wardens, in combination of the new machines allowing multiple payment modes.
Period Target Actual FQ3 Commentary
2023/24 FQ4 £968,262 £937,090
2024/25 FQ1 £289,219 £247,216
2024/25 FQ2 £373,922 £391,990
2024/25 FQ3 £237,910 £248,502
2024/25 FQ4 £963,049 £1,011,360
This indicator for FQ4 shows the cumulative amount of income has exceeded the cumulative target.
Actual trend line
There is no trend as this data is
cumulative as of FQ1 each financial year.
An increase in income but generally on track with targets.
Corporate Outcome - People live in safer and stronger communities
Car parking income to date (cumulative)
Responsible Person: Hugh O'Neill
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
7
Page 401

Page 402

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 B&C No Target 19 N/A N/A 19 dog fouling complaints were received this quarter in the Bute and Cowal area, with Bute receiving 8 and Cowal 11.
Period Actual FQ3 Commentary
2023/24 FQ4 19
2024/25 FQ1 12
2024/25 FQ2 12
2024/25 FQ3 22
2024/25 FQ4 19
2024/25 FQ4 A&B No Target 75 N/A N/A Unfortunately the number of dog fouling complaints has risen this quarter with 75 received in total.  It is hoped that over the
next quarter this number will fall.  The Warden service will, when time allows. continue to monitor.
Period Actual FQ3 Commentary
2023/24 FQ4 65
2024/25 FQ1 57
2024/25 FQ2 33
2024/25 FQ3 65
2024/25 FQ4 75
Corporate Outcome - People live in safer and stronger communities
Number of dog fouling complaints
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ4 shows the number of dog fouling complaints has decreased since the last reporting period.
This indicator for FQ4 shows the number of dog fouling complaints has increased since the last reporting period.
Actual trend line
A total of 65 dog fouling complaints were received for the whole of Argyll and Bute this quarter.  This may seem high,
however it has been found that dog fouling can be seasonal with spikes in dark nights and dark mornings with a lot of dog
walkers refraining from walking their dogs off the beaten tracks in the winter months.  The warden service will continue to
monitor as and when time allows.
Actual trend line
There has been a rise in the number of dog fouling complaints this quarter in the Bute and Cowal area, with Bute receiving 8
complaints and Cowal receiving 14.
8
Page 402

Page 403

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B 100% 100% 0% Green - Actual
meets Target
Each care experienced child and young person (CECYP) enrolled in an authority school has tracking and monitoring in place via
our education management system, known as Seemis.  Data collected includes attendance, exclusions, progress and
attainment and wellbeing information.  We work alongside schools and partner agencies to ensure care experienced status is
accurate, ensuring our CECYP have additional supports in place via the Virtual School and wider agencies as appropriate.  Our
bespoke care experience application which will further enhance our monitoring for our CECYP is currently in the final stage
before testing phase begins. We continue to work with partner agencies and other local authorities to support CECYP hosted
out with Argyll and Bute.
Period Actual FQ3 Commentary
2023/24 FQ4 100%
2024/25 FQ1 100%
2024/25 FQ2 100%
2024/25 FQ3 100%
2024/25 FQ4 100%
Actual trend line
Each care experienced child and young person (CECYP) enrolled in an authority school has tracking and monitoring plans in
place via our education management information system known as Seemis.  Data collated includes attendance, exclusion,
progress and attainment and wellbeing information.  We are continouosly working alongside schools and partner agencies to
ensure the CE status is accurately reflected.  Enhanced reporting and scrutinising of data, alongside greater awarness of our
CECYP, has led to earlier and positive intervention.  This is evidenced through our attainment data which shows a reduced
learning gap between CE and non-CE learners since 2021 -22 (with both cohorts showing increased attainment).  We continue
to work with partner agencies to support cross authority tracking and monitoring to support CECYP hosted out with Argyll and
Bute.
Corporate Outcome - Children and young people have the best possible start
COI - Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring plans in place
Responsible Person: Louise Lawson
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ4 meets the target with no change in performance since the last reporting period.
9
Page 403

Page 404

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B +/-5.00% -2% -3% Green - Actual
exceeds Target
We will continue to monitor schools that are not achieving the +/- 5% target.
B&C 3.93%, H&L -4.48%, MAKI -7.51%, OLI 1.09%)
Period Actual FQ3 Commentary
2023/24 FQ4 -3.44%
2024/25 FQ1 0.48%
2024/25 FQ2 -1.37%
2024/25 FQ3 0.14%
2024/25 FQ2 -2.25%
Corporate Outcome - Children and young people have the best possible start
COI - Provide quality meals within cost margins to all pupils
Responsible Person: Christine Boyle
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ4 within the +/-5.00% variance however performance has decreased since the last reporting period.
Actual trend line
We continue to monitor schools that are not achieving the +/- 5% target.
B&C 6.21, H&L -3.88%, MAKI -4.58%, OLI 1.68%
10
Page 404

Page 405

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 B&C 94.00% 93.80% -0.20% Red - Actual
below Target
As of 11th April 2025 the participation figure (16–19-year-olds in employment, training or education) in Bute and Cowal was
753  young people, which equates to 93.80%. This is 0.2% below the target and 0.5% below the annual Argyll and Bute
participation figure of 94.3% which was released by Skills Development Scotland at the end of August 2024. The participation
figure of 93.80% for FQ4 of 2024/25 is a increase of 0.85% on the participation figure for FQ3 of 2024/25, and represents an
increase of 2.64% on the FQ4 figure from 2023/24.
Period Actual FQ3 Commentary
2023/24 FQ4 91.16%
2024/25 FQ1 93.56%
2024/25 FQ2 95.16%
2024/25 FQ3 92.95%
2024/25 FQ4 93.80%
2024/25 FQ4 A&B 94.00% 93.50% -0.50% Red - Actual
below Target
As of 11th April 2025 the participation figure (16–19-year-olds in employment, training or education) across the whole of
Argyll and Bute was 3408 young people, which equates to 93.50%. This is 0.5% below  the target and 0.8% below the annual
Argyll and Bute participation figure of 94.3% which was released by Skills Development Scotland at the end of August 2024.
The participation figure of 93.50% for FQ4 of 2024/25 is a decrease of 0.69% on the participation figure for FQ3 of 2024/25.
Period Actual FQ3 Commentary
2023/24 FQ4 93.59%
2024/25 FQ1 94.99%
2024/25 FQ2 95.80%
2024/25 FQ3 94.19%
2024/25 FQ4 93.50%
Corporate Outcome - Our economy is diverse and thriving
Maximise the percentage of 16-19 year olds participating in education, training or employment
Responsible Person: Jennifer Crocket
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ4 is lower than the target however performance has increased since the last reporting period.
Actual trend line
As of 3rd February 2025 the participation figure (16–19-year-olds in employment, training or education) across the whole of
Argyll and Bute was 3921 young people, which equates to 94.19%. This is 0.19% above the target and 0.11% below the annual
Argyll and Bute participation figure of 94.3% which was released by Skills Development Scotland at the end of August 2024.
The participation figure of 94.19% for FQ3 of 2024/25 is a decrease of 1.61% on the participation figure for FQ2 of 2024/25.
This indicator for FQ4 is lower than the target and performance has decreased since the last reporting period.
Actual trend line
As of 3rd February 2025 the participation figure (16–19-year-olds in employment, training or education) in Bute and Cowal
was 870 young people, which equates to 92.95%. This is 1.05% below the target and 1.35% below the annual Argyll and Bute
participation figure of 94.3% which was released by Skills Development Scotland at the end of August 2024. The participation
figure of 92.95% for FQ3 of 2024/25 is a decrease of 2.21% on the participation figure for FQ2 of 2024/25.
11
Page 405

Page 406

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 B&C 0 0 0 Green - Actual
meets Target There were no  completions in Bute & Cowal in FQ4. 
Period Actual FQ3 Commentary
2023/24 FQ4 0
2024/25 FQ1 0
2024/25 FQ2 0
2024/25 FQ3 0
2024/25 FQ4 0
2024/25 FQ4 A&B 1 1 0 Green - Actual
meets Target
There was no Strategic Housing Investment Plan (SHIP) completions in FQ4, however West Highland Housing Association
(WHHA) concluded on new supply open market purchase in Kilmelford which increases supply of affordable housing.  There
has been delays to West Highland Housing Association  developments at Port Charlotte (phase 1) and Imerval (Phase 5) on
Islay due to issues with bringing hot tar to the Island to complete roads, bad weather,  ferry disruption  and issues with
Scottish Southern Energy Networks. 
Period Actual FQ3 Commentary
2023/24 FQ4 0
2024/25 FQ1 12
2024/25 FQ2 26
2024/25 FQ3 6
2024/25 FQ4 1
Corporate Outcome - Our economy is diverse and thriving
This indicator for FQ4 meets the target however performance has decreased since the last reporting period.
Actual trend line
Fyne Homes completed 6 x 3 bed general needs properties at Baddens, Lochgilphead in FQ3
Number of affordable social sector new builds completed per annum
Responsible Person: Kelly Ferns
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ4 meets the target with no change in performance since the last reporting period.
Actual trend line
There were no completions in B&C in FQ3.
12
Page 406

Page 407

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 B&C 75.0% 31.0% -44.0% Red - Actual
below Target
Performance across the Development Management Service is still being recovered and impacted upon by the management of
a significant backlog of casework. Overall output and performance across the service is improving as staff resource issues have
been resolved. However, timeliness measures continue to be adversely impacted through the prioritisation of older statutory
'legacy' casework for determination. The target for the handling of pre-application enquiries has been set to 30 days although
this change has not yet been reflected in the format of corporate reporting. During FQ4 29 pre-applications were responded
to within Bute and Cowal. 9 responses (31%) were issued within 20 days; 10 responses (34%) were issued within the revised
target of 30 days. It is acknowledged that performance is still significantly below target on this measure but is expected to
improve as casework pressure on available staff resource from 'legacy' items decreases over time.
Period Actual FQ3 Commentary
2023/24 FQ4 27.8%
2024/25 FQ1 54.5%
2024/25 FQ2 23.5%
2024/25 FQ3 22.7%
2024/25 FQ4 31.0%
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ4 is lower than the target however performance has increased since the last reporting period.
Actual trend line
Performance across the Development Management Service is still being recovered and impacted upon by the management of
a significant backlog of casework. Overall output and performance across the Service is improving as staff resource issues have
been resolved, however timeliness measures continue to be adversely impacted through the prioritisation of older statutory
'legacy' casework for determination. In order to assist with managing customer expectations the target response period has
been temporarily extended to 6 weeks. There continues to be a backlog of pre-application enquiries within the BCHL team
which is impacting upon performance although many of the open enquiries are in fact progressing with ongoing dialogue. 
During FQ3 the BCHL team's pre-app volume throughout increased, with a 118% turnover reported. Working through a
backlog of pre-apps inevitably means that the overall percentage turned around in 20 working days will be impacted. Of the
23 pre-apps closed, 18  were from the backlog of cases.
Corporate Outcome - Our economy is diverse and thriving
Percentage of pre-planning application enquiries processed within 20 working days
Responsible Person: Peter Bain
13
Page 407

Page 408

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B 75.0% 58.5% -16.5% Red - Actual
below Target
Performance across the Development Management Service is still being recovered and impacted upon by the management of
a significant backlog of casework. Overall output and performance across the service is improving as staff resource issues have
been resolved. However, timeliness measures continue to be adversely impacted through the prioritisation of older statutory
'legacy' casework for determination. The target for the handling of pre-application enquiries has been set to 30 days although
this change has not yet been reflected in the format of corporate reporting. During FQ4 118 pre-applications were responded
to across Argyll and Bute. 69 responses (58.5%) were issued within 20 days; 75 responses (64.1%) were issued within the
revised target of 30 days.
Period Actual FQ3 Commentary
2023/24 FQ4 55.0%
2024/25 FQ1 49.5%
2024/25 FQ2 49.2%
2024/25 FQ3 48.3%
2024/25 FQ4 58.5%
Corporate Outcome - Our economy is diverse and thriving
Percentage of pre-planning application enquiries processed within 20 working days
Responsible Person: Peter Bain
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
Actual trend line
Performance across the Development Management Service is still being recovered and impacted upon by the management of
a significant backlog of casework. Overall output and performance across the Service is improving as staff resource issues have
been resolved, however timeliness measures continue to be adversely impacted through the prioritisation of older statutory
'legacy' casework for determination. In order to assist with managing customer expectations the target response period has
been temporarily extended to 6 weeks. There continues to be a backlog of pre-application enquiries within the BCHL team
which is impacting upon overall Service performance although many of the open enquiries are in fact progressing with
ongoing dialogue. During FQ3 123 pre-apps were closed aross ABC.
Please find links below for supplementary information on performance in this area:
PPSL Committee - Development Management Performance Update: https://www.argyll-
bute.gov.uk/moderngov/documents/s215679/DM%20Performance%20Update%202024-25%20FQ3%20PB%2010.01.2025.pdf
Appendix 1: https://www.argyll-
bute.gov.uk/moderngov/documents/s215680/Appendix%201%20DM%20Performance%20Update%20FQ3%202425.pdf
This indicator for FQ4 is lower than the target however performance has increased since the last reporting period.
14
Page 408

Page 409

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 B&C 8.0 8.3 0.3 Red - Actual
exceeds Target
Performance across the Development Management Service has been impacted by a significant backlog of casework. Whilst
issues relating to staff resource availability have been resolved and output has significantly improved it is highlighted that
KPI's measuring average time taken remain adversely affected by the resolution of increasing volumes of 'legacy' casework.
The Council's target for 'householder' applications has been revised to 10 weeks although this is not yet reflected in the
format of corporate reports. During FQ4 only a handful of 'householder' 'legacy' items remained, this has resulted in a general
improvement across this particular performance measure. During FQ4 13 'householder' applications were determined in Bute
and Cowal and did not include any 'legacy' items and is reflected in the significant improvement in performance reported for
this period.
Period Actual FQ3 Commentary
2023/24 FQ4 17.2
2024/25 FQ1 11.4
2024/25 FQ2 43.4
2024/25 FQ3 16.3
2024/25 FQ4 8.3
Corporate Outcome - Our economy is diverse and thriving
Average number of weeks to determine householder planning applications
Responsible Person: Peter Bain
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ4 exceeds the target however performance has increased since the last reporting period.
Actual trend line
Performance across the Development Management Service has been impacted by a significant backlog of casework. Whilst
issues relating to staff resource availability have been resolved and output has significantly improved it is highlighted that
KPI's measuring average time taken are adversely affected by the resolution of increasing volumes of 'legacy' casework which
significantly skew reporting, particularly at area level where this relates to a small number of applications. During FQ3 6
'householder' applications were determined in B&C; these included 1 'legacy' item. Excluding this 'legacy' item the average
time taken to determine the other 5 applications was 10.8 weeks.
15
Page 409

Page 410

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B 8.0 14.2 6.2 Red - Actual
exceeds Target
Performance across the Development Management Service has been impacted by a significant backlog of casework. Whilst
issues relating to staff resource availability have been resolved and output has significantly improved it is highlighted that
KPI's measuring average time taken remain adversely affected by the resolution of increasing volumes of 'legacy' casework.
The Council's target for 'householder' applications has been revised to 10 weeks although this is not yet reflected in the
format of corporate reports. During FQ4 only a handful of 'householder' 'legacy' items remained, this has resulted in a general
improvement across this particular performance measure. During FQ4 68 'householder' applications were determined across
Argyll and Bute including 8 'legacy' items and is reflected in the significant improvement in performance reported for this
period. Excluding 'legacy' items, the remaining 60 applications were determined within an average time of 9.9 weeks.
Period Actual FQ3 Commentary
2023/24 FQ4 20.0
2024/25 FQ1 16.1
2024/25 FQ2 26.1
2024/25 FQ3 15.9
2024/25 FQ4 14.2
Responsible Person: Peter Bain
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ4 exceeds the target however performance has increased since the last reporting period.
Actual trend line
Performance across the Development Management Service has been impacted by a significant backlog of casework. Whilst
issues relating to staff resource availability have been resolved and output has significantly improved it is highlighted that
KPI's measuring average time taken are adversely affected by the resolution of increasing volumes of 'legacy' casework which
significantly skew reporting, particularly at area level where this relates to a small number of applications. During FQ3 60
'householder' applications were determined across all of ABC; these included 7 'legacy' items. Excluding the'legacy' items the
average time taken to determine the other 53 applications was 10.2 weeks.
Please find links below for supplementary information on performance in this area:
PPSL Committee - Development Management Performance Update: https://www.argyll-
bute.gov.uk/moderngov/documents/s215679/DM%20Performance%20Update%202024-25%20FQ3%20PB%2010.01.2025.pdf
Appendix 1: https://www.argyll-
bute.gov.uk/moderngov/documents/s215680/Appendix%201%20DM%20Performance%20Update%20FQ3%202425.pdf
Corporate Outcome - Our economy is diverse and thriving
Average number of weeks to determine householder planning applications
16
Page 410

Page 411

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B No Target 30 N/A N/A
During FQ4, the housing service took 108 homeless applications and provided temporary accommodation for 30 new
homeless households.
B&C: Out of 28 Homeless Applications, 10 new households went in to temporary accommodation (4 x Serviced
Accommodation, 4 x Bed & Breakfast, 2 Private Sector Lease).
H&L: Out of 30 Applications, 8 new households went in to temporary accommodation (1 x Serviced Accommodation, 7 x Bed
& Breakfast).
MAKI: Out of 31 Homeless Applications, 4 new households went in to temporary accommodation (4 x Private Sector Lease).
OLI: Out of 19 Homeless Applications, 8 new households went in to temporary accommodation (3 x Supported
Accommodation, 1 x Private Sector Lease, 1 x Registered Social Landlord, 3 x Bed & Breakfast).
Period Actual FQ3 Commentary
2023/24 FQ4 30
2024/25 FQ1 26
2024/25 FQ2 40
2024/25 FQ3 27
2024/25 FQ4 30
Corporate Outcome - Our economy is diverse and thriving
COI - Number of new homeless applicants who required temporary accommodation this period
Responsible Person: Morven Macintyre
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ4 shows the number of applicants has increased since the last reporting period.
Actual trend line
During FQ3, the housing service took 90 homeless applications and provided temporary accommodation for 27 new homeless
households.
B&C: Out of 25 Homeless Applications, 8 new households went in to temporary accommodation (4 x Serviced
Accommodation, 4 x Bed & Breakfast).
H&L: Out of 22 Homeless Applications, 8 new households went in to temporary accommodation (4 x Serviced
Accommodation, 2 x Bed & Breakfast, 1 x Private Sector Lease, 1 x Council Retained).
MAKI: Out of 23 Homeless Applications, 7 new household went in to temporary accommodation (3 x Private Sector Lease, 4 x
Bed & Breakfast).
OLI: Out of 20 Homeless Applications, 4 new households went in to temporary accommodation (3 x Supported
Accommodation, 1 x Serviced Accommodation).
Please note:
•  The Registered Social Landlord and Private Rented Sector properties are leased by the Council and sub-let to homeless households as temporary accommodation.
•  Serviced Accommodation is available in Cowal and Helensburgh and is for single people providing an en-suite bedroom and shared kitchen facilities.
• Supported accommodation is provided in Lorn by Blue Triangle Housing Association.
0
•  Emergency accommodation may on occasion be provided out with the location of the original presentation due to the pressure on the availability of temporary accommodation
17
Page 411

Page 412

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B 20.0% 15.2% -4.8% Red - Actual
below Target
FQ4 - 15.2%. There were 66 tender/quick quote contract awards during FQ4. 10 were awarded to local suppliers,
with a total estimated value of £78k. From the 66 awards, only 15 received local bids. The nature of the types of
contracts awarded can impact on submission of local bidders. The % of tenders won by a local supplier, where a
local supplier placed a bid during FQ4 was 66.7%.
Period Actual FQ3 Commentary
2023/24 FQ4 14.3%
2024/25 FQ1 36.0%
2024/25 FQ2 10.5%
2024/25 FQ3 23.6%
2024/25 FQ4 15.2%
COI - Maintain the percentage of local suppliers that benefit from the award of contracts via the procurement portal
Responsible Person: Anne MacColl-Smith
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ4 is lower than the target and performance has decreased since the last reporting period.
Actual trend line
From the 44 tender/quick quote contract awards during FQ3, 55 suppliers were successful, 13 of which were local suppliers.
However, only 18 received local bids. The nature of the types of contracts awarded can impact on submission of local bidders.
Of the 18 contracts, 13 were awarded to local suppliers (72.2%) with an estimated total contract value of £9.6m. The
Procurement, Commercial and Contract Management Team will continue to support local suppliers by providing useful
information on the Council's website.
Corporate Outcome - Our economy is diverse and thriving
18
Page 412

Page 413

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B No Target TBA N/A N/A The number of achieved community benefits during FQ3 and FQ4 is currently being gathered and data should be available at
the end of April 2025.
Period Actual FQ3 Commentary
2023/24 FQ4 37
2024/25 FQ1 -
2024/25 FQ2 31
2024/25 FQ3 -
2024/25 FQ4 TBA
Actual trend line
The next report covering FQ3 & FQ4 2024/25 will be available in April 2025.
Corporate Outcome - Our economy is diverse and thriving
COI - Increase the number of community benefits that are delivered through contracts we award locally
Responsible Person: Anne MacColl-Smith
This indicator is a Corporate Outcome Indicator that is reported in FQ2 and FQ4. The performance presented is Council-wide only.
This indicator for FQ4 shows the number of community benefits has increased since the last reporting period.
19
Page 413

Page 414

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 B&C 75% 91% 16% Green - Actual
exceeds Target Performance is good and exceeding the target.
Period Actual FQ3 Commentary
2023/24 FQ4 90%
2024/25 FQ1 91%
2024/25 FQ2 100%
2024/25 FQ3 87%
2024/25 FQ4 91%
2024/25 FQ4 A&B 75% 92% 17% Green - Actual
exceeds Target
Performance has improved in 3 of the 4 geographical settings . A number of cable faults and works requiring contractor or
power company assistance in Lomond is reflected in this quarters figures . These works take time to program and deliver. All
Areas appear to benefiting from the street lighting Capital Program Works which are improving reliability of lighting in areas
that were previously experiencing a higher number of faults.
Period Actual FQ3 Commentary
2023/24 FQ4 49%
2024/25 FQ1 93%
2024/25 FQ2 97%
2024/25 FQ3 92%
2024/25 FQ4 92%
Corporate Outcome - We have an infrastructure that supports sustainable growth
Percentage of street lighting faults repaired within 10 days
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ4 exceeds the target and performance has increased since the last reporting period.
Actual trend line
Continued Progress with the new tablets and software has seen a marked improvement across the service area.  46 faults
reported in total this quarter - a relatively low number. A generally busy period for the Service though and at a time when
staff do take annual leave.
This indicator for FQ4 exceeds the target and performance has increased since the last reporting period.
Actual trend line
Continued Progress with the new tablets and software has seen a marked improvement across the service area. 341 faults
reported in total this quarter - a high number but in general we deal with more faults in FQ3 and FQ4 each year.
This has been a busy quarter for the Service and at a time when staff do take annual leave. Capital Improvement Schemes will
have helped deal with lighting that was that was previously unrealiable.
20
Page 414

Page 415

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 Bute No Target 1 N/A N/A There was 1 waste collection complaint received this quarter on the Isle of Bute.
Period Actual FQ3 Commentary
2023/24 FQ4 0
2024/25 FQ1 0
2024/25 FQ2 0
2024/25 FQ3 0
2024/25 FQ4 1
2024/25 FQ4 Cowal No Target 2 N/A N/A Cowal received 2 waste collection complaints for the months of January, February and March
Period Actual FQ3 Commentary
2023/24 FQ4 0
2024/25 FQ1 3
2024/25 FQ2 2
2024/25 FQ3 1
2024/25 FQ4 2
Corporate Outcome - We have an infrastructure that supports sustainable growth
Number of waste collection complaints
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ4 shows the number of waste collection complaints has increased since the last reporting period.
Actual trend line
Another great service provided by the team in the Cowal area, only 1 waste collection complaint received.
Actual trend line
There were no waste collection complaints received this quarter for the Isle of Bute.  An excellent service provided by the
Waste Team.
This indicator for FQ4 shows the number of waste collection complaints has increased since the last reporting period.
21
Page 415

Page 416

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B No Target 31 N/A N/A
In total 31 waste collection complaints were received for the whole of Argyll and Bute.  Again the majority of the complaints
were received in Helensburgh, due to vehicle breakdowns and resources.  The waste team continue to deliver a very high level
of service across the whole area.
Period Actual FQ3 Commentary
2023/24 FQ4 7
2024/25 FQ1 38
2024/25 FQ2 26
2024/25 FQ3 36
2024/25 FQ4 31
Corporate Outcome - We have an infrastructure that supports sustainable growth
Number of waste collection complaints
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ4 shows the number of waste collection complaints has decreased since the last reporting period.
Actual trend line
In total there were 36 waste collection complaints received for the whole Argyll and Bute Council area for the months of
October, November and December.  The majority of which were received in the Helensburgh and Lomond area due to vehicle
breakdowns and resourcing.  The teams are still delivering a very high level of service to the many properties throughout the
areas ensuring the domestic, recycling, glass and food waste is uplifted.
22
Page 416

Page 417

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B 45.0% 63.2% 18.2% Green - Actual
exceeds Target
63.2% recycling, composting and recovery (35.9% recycling/composting plus 27.3% recovery). Recovery percentage high
mainly due to Helensburgh and Lomond residual waste going for refuse derived fuel/energy from waste.
Recycling/composting slightly lower as reduced garden waste tonnages sent for composting during winter months. 2024/25
financial year overall figures are 67.2% recycling,composting and recovery (40.3% recycling/composting plus 26.9% recovery)
which is an improvement on previous f/year which was 58.2% .
Period Actual FQ3 Commentary
2023/24 FQ4 74.0%
2024/25 FQ1 68.4%
2024/25 FQ2 70.5%
2024/25 FQ3 65.4%
2024/25 FQ4 63.2%
2024/25 FQ4 Renewi No Target 46.8% N/A N/A
46.8% recycling, composting and recovery (31.5% recycling/composting plus 15.3% recovery). Recycling/composting slightly
lower as reduced garden waste tonnages sent for composting during winter months. 2024/25 financial year overall figures are
54.9% recycling,composting and recovery (38.5% recycling/composting plus 16.4% recovery).
Period Actual FQ3 Commentary
2023/24 FQ4 66.5%
2024/25 FQ1 56.2%
2024/25 FQ2 61.3%
2024/25 FQ3 52.4%
2024/25 FQ4 46.8%
Actual trend line
65.4% recycling, composting and recovery (37.2% recycling/composting plus 28.2% recovery) . Target exceeded mainly due to
high recovery levels for Helensburgh and Lomond's residual waste which now goes for refuse derived fuel (RDF) instead of
landfill. Less garden waste  composted during this quarter than FQ2 which is expected as green waste composting is higher
during spring/summer periods. Recycling and composting rate of 37.2% is marginally higher than same quarter in previous
year (which was 36.1%).
This indicator for FQ4 shows the percentage of waste recycled has decreased since the last reporting period.
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - Percentage of waste recycled, composted and recovered
Responsible Person: John Blake
This indicator is reported quarterly. The performance presented is by Council-wide service provision.
This indicator for FQ4 exceeds the target however performance has decreased since the last reporting period.
Actual trend line
52.4% recycling, composting and recovery (35.3% recycling/composting plus 17.1% recovery) . Less garden waste  composted
during this quarter than FQ2 which is expected as green waste composting is higher during spring/summer periods. Recycling
and composting rate of 35.3% is marginally higher than same quarter in previous year (which was 33.9%).
23
Page 417

Page 418

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 Islands No Target 49.2% N/A N/A 49.2% recycling, composting and recovery (38.7% recycling/composting plus 10.5% recovery). 2024/25 financial year overall
figures are 48.1% recycling,composting and recovery (37.3% recycling/composting plus 10.8% recovery).
Period Actual FQ3 Commentary
2023/24 FQ4 41.5%
2024/25 FQ1 45.8%
2024/25 FQ2 51.8%%
2024/25 FQ3 51.8%
2024/25 FQ4 49.2%
2024/25 FQ4 H&L No Target 100.0% N/A N/A
100% recycling, composting and recovery (43.7% recycling/composting plus 56.3% recovery). Recovery percentage high mainly
due to Helensburgh and Lomond residual waste going for refuse derived fuel/energy from waste. Recycling/composting
slightly lower than in spring/summer as reduced garden waste tonnages sent for composting during winter months.24/25
financial year overall figures are 100% recycling,composting and recovery (45.1% recycling/composting plus 54.9% recovery).
Period Actual FQ3 Commentary
2023/24 FQ4 100.0%
2024/25 FQ1 100.0%
2024/25 FQ2 100.0%
2024/25 FQ3 100.0%
2024/25 FQ4 100.0%
This indicator for FQ4 shows the percentage of waste recycled has decreased since the last reporting period.
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - Percentage of waste recycled, composted and recovered
Responsible Person: John Blake
This indicator is reported quarterly. The performance presented is by Council-wide service provision.
Actual trend line
100% recycling, composting and recovery (43.1% recycling/composting plus 56.9% recovery) . High recovery levels for
Helensburgh and Lomond's residual waste which now goes for refuse derived fuel (RDF) instead of landfill. Less garden waste 
composted during this quarter than FQ2 which is expected as green waste composting is higher during spring/summer
periods. Recycling and composting rate of 43.1% is marginally higher than same quarter in previous year (which was 40.8%).
Actual trend line
44.2% recycling, composting and recovery (31.9% recycling/composting plus 12.3% recovery) . Less garden waste  composted
during this quarter than FQ2 which is expected as green waste composting is higher during spring/summer periods. Recovery
rate of 12.3% in quarter is higher than same quarter in previous year (which was 0%) as residual waste from Coll and Tiree
now goes for refuse derived fuel (RDF) instead of landfill.
This indicator for FQ4 shows the percentage of waste recycled has remained the same since the last reporting period.
24
Page 418

Page 419

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B 5,000 3,103 -1,897 Green - Actual
below Target
Well within landfill limit target mainly due to Helensburgh and Lomond residual waste going for refuse derived fuel/energy
from waste.
Period Target Actual FQ3 Commentary
2023/24 FQ4 5,000 2,567
2024/25 FQ1 5,850 3,200
2024/25 FQ2 5,550 3,225
2024/25 FQ3 5,100 2,846
2024/25 FQ4 5,000 3,103
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - Number of tonnes of waste sent to landfill
Responsible Person: John Blake
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ4 is lower than the target (lowest is best).
Actual trend line
Well within biodegradable municpal waste target for the quarter mainly due to the residual waste from Helensburgh and
Lomond area now all going for refuse derived fuel (RDF)/ energy from waste (EFW) whereas this was previously sent to landfill
in same quarter in 2023.
25
Page 419

Page 420

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 Bute 73 77 4 Green - Actual
exceeds Target Again this quarter the Isle of Bute's street cleanliness exceeds the actual target.
Period Actual FQ3 Commentary
2023/24 FQ4 81
2024/25 FQ1 81
2024/25 FQ2 80
2024/25 FQ3 78
2024/25 FQ4 77
2024/25 FQ4 Cowal 73 80 7 Green - Actual
exceeds Target
Cowal has submitted a street cleanliness figure of 80 for the months of January, February and March, this again shows the
good standard of cleanliness in this area.
Period Actual FQ3 Commentary
2023/24 FQ4 76
2024/25 FQ1 75
2024/25 FQ2 78
2024/25 FQ3 77
2024/25 FQ4 80
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - LEAMS (Local Environment Audit and Management System)
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ4 exceeds the target however performance has decreased since the last reporting period.
Actual trend line
Cowal's street cleanliness figure remains steady this quarter, thanks to the teams working in this area ensuring the area is well
maintained.
Actual trend line
The Isle of Bute has again this quarter exceeded the bench marking and national average with a street cleanliness score of 78, 
meaning the Island's street cleanliness is to a good standard.
This indicator for FQ4 exceeds the target and performance has increased since the last reporting period.
26
Page 420

Page 421

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B 73 83 10 Green - Actual
exceeds Target
January, February and March figures show that again this quarter the street cleanliness across the whole of Argyll and Bute
remains high.  These figures show very little or no litter visible in the streets and or open spaces checked.  This high score
reflects well on the teams on the islands and mainland who are providing a good service by ensuring they work efficiently and
effectively to keep the areas clean.
Period Actual FQ3 Commentary
2023/24 FQ4 83
2024/25 FQ1 84
2024/25 FQ2 85
2024/25 FQ3 84
2024/25 FQ4 83
Actual trend line
The street cleanliness figure for the months of October, November and December for the whole of the Argyll and Bute Council
area remains high.  This means the areas scored show no or a very small amount of litter visible but not detracting from the
look of the area.  The teams on both the mainland and islands are providing a good service by ensuring weeds, detritus, litter,
fly posting, grafitti etc are being dealt with timeously.
This indicator for FQ4 exceeds the target however performance has decreased since the last reporting period.
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - LEAMS (Local Environment Audit and Management System)
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
27
Page 421

Page 422

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 B&C No Target 4.07 N/A N/A
Work days lost has increased by 0.07 of a day on the same quarter last year and has increased by 0.31 of a day from the
previous quarter.
Period Actual FQ3 Commentary
2023/24 FQ4 4.00
2024/25 FQ1 2.95
2024/25 FQ2 2.09
2024/25 FQ3 3.76
2024/25 FQ2 4.07
2024/25 FQ4 A&B No Target 3.23 N/A N/A Work days lost has increased by 0.41 of a day on the same quarter last year and has increased by 0.34 of a day from the
previous quarter.
Period Actual FQ3 Commentary
2023/24 FQ4 2.82
2024/25 FQ1 2.14
2024/25 FQ2 1.77
2024/25 FQ3 2.89
2024/25 FQ4 3.23
Corporate Outcome - Making it happen
COI - Teacher sickness absence
Responsible Person: Jennifer Crocket (B&C and MAKI) / Wendy Brownlie (H&L and OLI)
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ4 shows the number of sickness absence days has increased since the last reporting period.
Actual trend line
Work days lost has increased by 0.04 of a day on the same quarter last year and has increased by 1.67 of a day from the
previous quarter.
This indicator for FQ4 shows the number of sickness absence days has increased since the last reporting period.
Actual trend line
Work days lost has increased by 0.07 of a day on the same quarter last year and has increased by 1.12 of a day from the
previous quarter.
28
Page 422

Page 423

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 B&C No Target 5.68 N/A N/A Work days lost has increased by 1.04 of a day on the same quarter last year and has increased by 1.03 of a day from the
previous quarter.
Period Actual FQ3 Commentary
2023/24 FQ4 4.64
2024/25 FQ1 4.53
2024/25 FQ2 3.87
2024/25 FQ3 4.65
2024/25 FQ4 5.68
2024/25 FQ4 A&B No Target 4.66 N/A N/A Work days lost has increased by 0.54 of a day on the same quarter last year and has increased by 0.26 of a day from the
previous quarter.
Period Actual FQ3 Commentary
2023/24 FQ4 4.12
2024/25 FQ1 3.85
2024/25 FQ2 3.43
2024/25 FQ3 4.40
2024/25 FQ4 4.66
Corporate Outcome - Making it happen
COI - LGE staff (including non-Teacher) sickness absence
Responsible Person: Carolyn Cairns
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ4 shows the number of sickness absence days has increased since the last reporting period.
Actual trend line
Work days lost has increased by 0.67 of a day on the same quarter last year and has increased by 0.97 of a day from the
previous quarter. 
This indicator for FQ4 shows the number of sickness absence days has increased since the last reporting period.
Actual trend line
Work days lost has increased by 0.23 of a day on the same quarter last year and has increased by 0.78 of a day from the
previous quarter.
29
Page 423

Page 424

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B 70.0% 74.8% 4.8% Green - Actual
exceeds Target
In FQ4 there were 39,517 customer transactions dealt with by Customer Service Agents (25.2%) and 117,568
were automated or self-service transactions (74.8%) so the 70.0% target was substantially bettered. 
Period Actual FQ3 Commentary
2023/24 FQ4 70.1%
2024/25 FQ1 71.6%
2024/25 FQ2 72.7%
2024/25 FQ3 82.7%
2024/25 FQ4 74.8%
Corporate Outcome - Making it happen
COI - Increase the percentage of all self-service automated contacts
Responsible Person: Robert Miller
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ4 exceeds the target however performance has decreased since the last reporting period.
Actual trend line
In FQ3 there were 33,666 customer transactions dealt with by Customer Service Agents (17.3%) and 160,491 were automated
or self-service transactions (82.7%) so the 70.0% target was substantially bettered.  This was largely due to the significant
increase in customers using the improved Bin Day Uplift online resources.
30
Page 424

Page 425

ARGYLL AND BUTE COUNCIL  BUTE AND COWAL AREA
COMMITTEE 
CUSTOMER SERVICES  03 JUNE 2025 
CRUACH MOR AND CLACHAN FLATS WIND FARM TRUSTS 
1.0. INTRODUCTION 
1.1 This report seeks to update the Bute and Cowal Area Committee on the work
undertaken by the wind farm trusts set up at both Cruach Mhor (Glendaruel)
and Clachan Flats (Cairndow) in accordance with consented developments. 
1.2 The Area Committee is asked to note these updates, which are the most
recent of the annual updates required by the Area Committee on the work of
the Trusts. 
2.0 RECOMMENDATION 
2.1 Members are asked to note these updates, which are the most recent of the
annual updates required by the Area Committee on the work of the Trusts. 
3.0 DETAIL 
3.1 Wind Farm Trusts were set up in accordance with consented developments
at both Cruach Mhor (Glendaruel) and Clachan Flats (Cairndow). Part of the
conditions attached to those consents was that the Bute and Cowal Area
Committee be updated annually on the work undertaken by the Trusts in
supporting community projects within their Trust areas. 
3.2 The updates provided in this report, at Appendices 1 and 2, are the most
recent provided by the Trusts and cover the work for financial year 2024/25. 
4.0 CONCLUSION 
4.1 Members are asked to note the content of the submitted information. 
5.0 IMPLICATIONS 
5.1  Policy – none 
5.2  Financial – none 
5.3  Legal – none
Page 425 Agenda Item 11

Page 426

5.4  HR – none   
5.5  Fairer Scotland Duty: 
5.5.1  Equalities – protected – none 
5.5.2  Socio-economic Duty – none 
5.5.3  Islands – none 
5.6  Climate change – none 
5.7  Risk – none 
5.8  Customer Service – none 
5.9  The Rights of the Child (UNCRC) - none 
Douglas Hendry
Executive Director with responsibility for Legal and Regulatory Support 
Councillor Mark Irvine, Policy Lead for Community Planning and Corporate
Services 
May 2025 
Appendix 1 – Clachan Flats Windfarm Trust Annual Report 2024/25 
Appendix 2 – Cruach Mhor Windfarm Trust Annual Report 2024/25 
For further information contact: Stuart McLean, Committee Manager, 
01436 658717, stuart.mclean@argyll-bute.gov.uk                                                 
Page 426

Page 427

Community Benefit Annual Report
Please email a completed version of this report annually to communitybenefit@scottishpower.com 
Please provide sufficient information for us to understand what has been delivered and who has benefitted from the project/initiative.
SPR Windfarm providing fund: Date Report Submitted:
Fund Recipient: Period Covered by Report:
Community Benefit Org: SPR Funds Received During Period (£)
3rd Party Administrator (if applicable): Total of Awards Granted During Period (£)
Reporting Contact Name: Percentage of Annual Payment Granted (%)
Reporting Contact Role: Funds Paid Out During Period (£)
Reporting Contact Email: Fund Balance at Reporting Date (£)
Fund Balance Less Commitments (£)
Beneficiary Project Category Project Name Project and Description Total SPR Funds
Granted (£)
Grant Award
Date Grant Status Value Paid (£) Date(s) Paid Total match funding
from other sources
Applicant who received grant funding Select the most appropriate
category for the project
from the drop down menu.
What is the project name?
This should remain consistent for multi phase
projects crossing multiple reporting periods.
Please enter a short description of the project.
What was the project background?
What did the project aim to deliver?
Who did it benefit?
What did the SPR funding specifically contribute to?
Please confirm exact
funding granted during
this reporting year.
When was the
funding for the grant
application
approved?
Please select from the drop
down menu.
Is the funding pending or
partially or fully paid?
Please specify the
amount of funding
paid.
Please specify the
date funding was
paid.
Please list the total
amount of match
funding (£).
Cairndow Community Childcare Community or Local Event Resources for Childcare Centre
£1000 part funding for fence in outdoor area to separate age groups,  £550 Arts
and Craft resources, £300 for replacement sand for play area , £2000 towards
electricity costs – total £3850
£3,850.00 01/07/2024 Fully Paid £3,850.00 01/07/2024 £0.00
Cairndow Village Hall Upgrading Community
Facilities Solar Panel Upgrade
Funding to help upgrade curent solar panels to align with the recently upgraded
heating system. This is essential as the hall is now part of the Community Council
Resillience Plan.
£2,300.00 01/07/2024 Fully Paid £2,300.00 01/07/2024 £0.00
Cairndow Community Childcare Community or Local Event Help funding Annual Accounts Audit and Community
Ceilidh
Funding to cover the costs of annual preparation and inspection of account by
qualified accountants – required by OSCR and Company House. Additional
funding to cover band hire, hall hire and marketing for Community Ceilidh.
£1,600.00 03/10/2024 Fully Paid £1,600.00 03/10/2024 £0.00
Here We Are Provision of Community
Services Our Care – Hospital Transport
Funding to cover fuel costs for a  service that provides hospital tansport to
appointments for members of the commity. A local resident has kindly offered his
time to provide this service. They would like this project to run for 6 months.
£842.40 16/03/2025 Fully Paid £842.40 16/03/2025 £0.00
Dunoon School Hostel Parent Partnership Education & Upskilling Teacher-led supported study
Part funding towards teacher-led supported study at hostel. Through a
combination of parental contributions and community grants, they will be able to
fund 2 hours of supported study each school night within the hostel for 2025.
£500.00 16/03/2025 Fully Paid £500.00 16/03/2025 £0.00
Cairndow Clay Target Club Sport & Recreation Flail Mower Part funding towards the cost of a new Flail Mower. The Flail Mower is an
essential piece of equipment to maintain the field in which they operate. £1,000.00 16/03/2025 Fully Paid £1,000.00 16/03/2025 £0.00
Fully Paid £5,160.00 01/07/2024 £0.00Here We Are Provision of Community
Services Home Help Service £5,160.00 01/07/2024Funding towards ‘Our Care’ - Home Help Service. The costs will cover paying a home helper
for 15 hours per week over a 6 month period.
£0.00
CLACHAN FLATS 12/05/2025
ARGYLL & BUTE COUNCIL 01/05/2024 – 01/05/2025
Clachan Flats (Cairndow) Community Council £6,967.43
iain@algiz.co.uk £6,542.46
£15,252.40
Iain Lindsay 219%
Secretary £0.00
#Internal Use
Page 427

Page 428

This page is intentionally left blank

Page 429

Page 429

Page 430

This page is intentionally left blank

Page 431

Bute and Cowal Area Committee 
Workplan 2025-2026 
Committee Date Report Description Lead Service and contact
officer
Regularity of
occurrence/
consideration
Date for Reports
to Committee
Services
Additional
Comment
June 2025     
3 June 2025 Area Performance
Report – FQ4
2024/25
Customer Support 
Services – 
Kay Owen/
Claire McAllister
Quarterly Report 9 May 2025 
3 June 2025 Roads and
Infrastructure
Service Update
Roads and 
Infrastructure – 
Mark Calder
Quarterly Report 9 May 2025 
3 June 2025 Argyll Community
Housing Association
(ACHA) Update
ACHA – 
Chief Executive (Michelle
Mundie)
Annual Report/
Presentation
9 May 2025 
3 June 2025 Rothesay Pavilion to
Albert Pier Active
Travel Project –
Update Report
Development and Economic 
Growth – Colin Young
As required 9 May 2025 
3 June 2025 Secondary School
Report – Dunoon
Grammar School
Education – David Mitchell Annual Report 9 May 2025 
3 June 2025 Secondary School
Report – Rothesay
Academy
Education – Louise Nicol Annual Report 9 May 2025 
3 June 2025 Cruach Mor and
Clachan Flats Wind
Farm Trusts 
Legal and Regulatory 
Support – 
Stuart McLean 
Annual Report for
Noting
9 May 2025 
3 June 2025 Clachan Flats
Windfarm Trust:
Legal and Regulatory 
Support – 
As Required 9 May 2025 
Page 431
Agenda Item
12

Page 432

Bute and Cowal Area Committee 
Workplan 2025-2026
Committee Date Report Description Lead Service and contact
officer
Regularity of
occurrence/
consideration
Date for Reports
to Committee
Services
Additional
Comment
Appointment of
Trustee 
Melissa Stewart 
3 June 2025 Argyll and Bute
Health and Social
Car Partnership
Performance Report
- FQ3 2024/25
Argyll and Bute Health and 
Social Care Partnership –
Charlotte Craig
Bi-Annual Report 9 May 2025 
September 2025     
2 September
2025
Area Performance
Report – FQ1
2025/26
Customer Support 
Services – 
Kay Owen/ 
Claire McAllister
Quarterly Report 7 August 2025 
2 September
2025
Roads and
Infrastructure
Service Update
Roads and 
Infrastructure – 
Mark Calder
Quarterly Report 7 August 2025 
2 September
2025
Supporting
Communities Fund
2025/26 
Chief Executive –
Ailie Law/Amie Dow/Julie Fish 
Annual Report 7 August 2025 
2 September
2025
Recycling and
Recovery
Performance 
Roads and 
Infrastructure –
John Blake
Annual Report  7 August 2025 
2 September
2025
CHARTS (Argyll
and the Isles) 
Seymour Adams  Annual Report 7 August 2025 
December 2025     
2 December
2025
Area Performance
Report – FQ2
2025/26
Customer Support 
Services – 
Kay Owen/
Quarterly Report 7 November
2025 
Page 432

Page 433

Bute and Cowal Area Committee 
Workplan 2025-2026
Committee Date Report Description Lead Service and contact
officer
Regularity of
occurrence/
consideration
Date for Reports
to Committee
Services
Additional
Comment
Claire McAllister
2 December
2025
Argyll and Bute
Health and Social
Care Partnership
Performance Report 
Health and Social Care 
Partnership – 
Charlotte Craig
Annual Report 7 November
2025 
2 December
2025
Charitable Trusts,
Bequests and Trust
Funds
Legal and Regulatory 
Support – 
Stuart McLean
Annual Report 7 November
2025 
2 December
2025
Roads and
Infrastructure
Service Update
Roads and 
Infrastructure – 
Mark Calder
Quarterly Report 7 November
2025 
2 December
2025
The Third Marquis
of Bute’s Silver
Wedding Dowry
Fund
Legal and Regulatory 
Support – 
Stuart McLean
Annual Report 
(If Required)
7 November
2025 
2 December
2025
The Provost’s fund
(Bute) – Award
Recommendations 
Legal and Regulatory 
Support – 
Stuart McLean
Annual Report
(If Required)
7 November
2025 
2 December
2025
Fyne Homes
Update
Fyne Homes –
Chief Executive
Annual Report 7 November
2025 
Page 433

Page 434

This page is intentionally left blank