Democracy Spraffa

Public reports pack

Argyll and Bute Council · 20 February 2025
Back to Budget Pack — 20 February 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

BUDGETING PACK 2025/26 
1. INTRODUCTORY REPORT AND RECOMMENDATIONS FOR BUDGET PAPERS
(Pages 3 - 12) 
2. REVENUE BUDGET 
(a) Revenue Budget Overview 2025-26 to 2029-30 (Pages 13 - 70) 
(b) Revenue Budget 2025-26 - Fees and Charges (Pages 71 - 122) 
(c) Financial Risks Analysis 2025-26 (Pages 123 - 134) 
(d) Reserves and Balances - Updated for Budget Pack 2025-26 (Pages 135 - 162) 
3. CAPITAL PLAN 
(a) Capital Plan 2025-28 Summary Report (Pages 163 - 178) 
(b) Corporate Asset Management Strategy and Plan (Pages 179 - 228) 
Public Document Pack

Page 2

This page is intentionally left blank

Page 3

ARGYLL AND BUTE COUNCIL COUNCIL
FINANCIAL SERVICES 27 FEBRUARY 2025
INTRODUCTORY REPORT AND RECOMMENDATIONS FOR BUDGET PAPERS 
1.  EXECUTIVE SUMMARY 
1.1 This report introduces the full package of papers included in the budget packs in
relation to the revenue and capital budgets 
REVENUE PACK 
Revenue Budget Overview 
1.2 This report summarises the overall revenue budget position covering funding,
expenditure and savings.  It also sets out the assumptions and proposals around
non-pay inflation and the cost and demand pressures for inclusion in the revenue
budget. 
1.3  The Local Government Finance Circular 10/2024 was published on 12 December
2024 and provides detail of the provisional total revenue and capital funding
allocations for 2025-26.  The Council’s provisional General Revenue Grant is
£254.995m in addition to Revenue Specific Grant of £4.539m.      
1.4 Following the publication of Finance Circular 10/2024 there has been some
changes to distributions in addition to previously non-distributed funding now
having an agreed distribution methodology.  These changes will not be confirmed
until the Finance Order is approved on 27 February 2025, but I have reflected what
I consider to be a reasonable estimate of the changes that are expected.  This
increases the General Revenue Grant for 2025-26 to £259.134m and £4.539m in
specific grants.   
1.5 The Cabinet Secretary for Finance and Local Government announced on Tuesday
4 February 2025 that Scottish Government has now agreed to provide an
additional £144m to Local Government in respect of the Employer’s National
Insurance increase and this funding represents 60% of direct staffing costs.  This
announcement was made to provide some certainty for councils as part of their
budget setting.  The increased cost is estimated to be £4.314m for 2025-26
(Council £3.450m and HSCP £0.864m).  Based on the announcement it is
estimated that we will receive £2.578m of funding. 
1.6 On 29 November 2024 the Council received a letter from the Department of
Environment Food and Rural Affairs (DEFRA) providing our authority’s estimated
payment amount in respect of Extended Producer Responsibility in relation to
Waste Packaging.  Our estimated payment for 2025-26 is £3.847m. The final
allocation will be confirmed in Autumn 2025.  As it is unclear at this stage what
requirements will be attached to this additional funding, in addition to not knowing
the final allocation until Autumn 2025 it is recommended that only a proportion of
Page 3 Agenda Item 1

Page 4

the funding is used to support the 2025-26 budget.  There is a non-pay inflation
pressure for waste/landfill tax for £0.790m and a cost pressure for BMW Ban for
£0.558m and it is recommended that £1.348m is used for these purposes with the
remaining £2.499m carried forward to 2026-27.   
1.7 The Council Tax budget for 2024-25 was set at £63.278m.  Growth has been
increased for 2025-26 to 0.75% to help rebase the position following a review
undertaken by the Assessor at Dunbartonshire and Argyll and Bute Valuation Joint
Board and amounts to £0.472m.    
1.8 The budget for 2024-25 has been rolled forward into 2025-26 and the main
changes to the 2025-26 base budget are summarised below: 
• Removal of cost pressures relating to 2024-25 only of £0.130m
• Removal of one-off Management/Operational savings of £1.694m
• Release of Contingency back to general fund in 2024-25 of £0.200m
• Adjustment to re-base contribution to Joint Boards of £0.114m
• Adjustment for re-basing NDR (unbudgeted 2024-25 Rate poundage
increase) of £0.300m
• Adjustment to right-size ferries budgets ensuring income and expenditure
match as this is specific grant funded £0.037m
• Adjustments relating to pay within 2024-25 for Children’s Social Work
(Education service) - £0.063m
• SJC Pay Award 2024-25 - £2.636m
• Pay Award Elected Members 2024-25 - £0.033m
• Settlement Directions (Council services) of £2.992m.   
1.9 Other increases to the budget are summarised below: 
• Employee cost changes of £8.686m.   This relates to estimated pay inflation
for 2025-26, increments, employee base changes and the increase to
employer’s national insurance.  
• Unavoidable/inescapable inflation of £2.978m.  This includes utilities,
catering purchases, contract inflation, insurances and landfill tax.
• A number of cost and demand pressures amounting to £4.771m.  The most
significant being Bus Transport Contract £1.735m, compliance with BMW
Ban £0.558m, School Transport for ASN pupils, £0.500m and Insurance
increases £0.309m.   
1.10 The revised payment to the Health and Social Care Partnership, reflects 2024-25 in
year adjustments and the net changes to the settlement in respect of Social Work
that we have been directed to pass over to the Health and Social Care Partnership. 
Due to the significant financial pressure that the Health and Social Care
Partnership is facing as a result of the increasing number of older persons and the
increased demand, it is recommended that Council consider passing over a further
increase to the HSCP, this will pass over a share of the additional funding that the
Council has received without conditions attached.  It is recommended to pass over
£0.370m equivalent to 1% pay award to ensure that the HSCP have sufficient
budget to match the public sector pay policy for social work staff as well as
Page 4

Page 5

£0.346m in relation to the anticipated shortfall in the Employer’s National Insurance
funding.  The revised payment amounts to £81.492m. 
1.11 There are a number of measures to balance the budget that have previously been
agreed at the Council’s budget meeting on 22 February 2024 which have a net
effect of reducing the 2025-26 budget gap by £0.283m.  In addition, the Council
agreed on 26 September 2024 to release £1.558m of existing earmarked reserves
to help bridge the budget gap.   
1.12 There are a number of other measures to balance the budget that are for Council
approval, summarised as follows:
• General inflationary increase of 6% to fees and charges resulting in
£0.363m of additional income. 
• New management/operational savings amounting to £2.102m.
• New policy options savings amounting to £0.991m. 
1.13 The budget gap after the measures to balance the budget is a deficit of £2.471m in
2025-26.   
1.14 The setting of Council Tax should happen on the same day as the Council sets its
revenue budget as once all proposals are considered, Council Tax is the balancing
figure.  The gap outlined in paragraph 1.13 above is based on a 5% Council Tax
increase (this is the assumption that has been in the budget outlook during the
year).   In order to get to a balanced budget, Council will need to increase Council
Tax to 8.9%.   The alternative to increasing Council Tax further is that Council
would need to fund the gap using reserves or other funds held, which would be a
one-off fix, however, Members need to be mindful of the significant gap in future
years as well as the pressures facing the capital plan.   
1.15 The budget gap over the period 2026-27 to 2029-30 across each scenario is
summarised in the table below.   
Budget Gap 2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
Total
£000
Best Case (5,907) (7,343) 262 (344) (13,332)
Mid-Range (9,528) (10,373) (4,424) (5,212) (29,537)
Worst Case (16,131) (16,763) (10,981) (12,124) (55,999) 
1.16  A number of funding requests have been received and Members are asked to give
consideration to these requests and how they would be funded.   
Fees and Charges 
1.17 This report sets out proposals for increases in fees and charges and the resulting
impact on income included in the revenue budget. 
1.18 The general increase to fees and charges is proposed at 6% for 2025-26 and is
expected to generate additional income of £0.363m. 
Page 5

Page 6

1.19 The changes proposed to the Social Work fees and charges are noted within the
report and have been the subject of a report to the Integrated Joint Board on 29
January 2024. 
1.20 Harbour Fees have been increased by 3%. This 3% increase is ring fenced to fund
asset improvement and sustainability within the piers and harbours. This is
estimated to generate additional income of £0.279m. No general inflationary
increase has been proposed for piers and harbours dues in order that the service is
cost neutral. 
1.21 New fees and charges which are being introduced for 2025-26 are summarised
below:
• Ferry Services
o Jura Ferry Concession Fare, car and driver
o Cuan Ferry Concession Fare, car and driver
• Short-term let licensing
o New fees introduced on the back of a revision of the STL Policy.
• Environmental Health Section 50 Licence Certificate
o New fee to recover the costs from business as a result of savings
option DEG 002 25/26
• New discretionary planning fees that are part of proposed savings. 
Financial Risks Analysis 2025-26 
1.22 This report set out the risks identified as part of preparing the revenue budget and
makes an assessment of the potential financial impact of these.  The financial risks
are monitored routinely throughout the year and actions put in place to mitigate
risks. 
1.23 There are currently 7 council wide revenue risks identified for 2025-26, with a
potential annual value totalling £8.1m, and with varying degrees of likelihood. 
Description  Likelihood
Assessed
Financial
Impact
£m
Unbudgeted Severe Weather costs 3 2.0
Pay Award exceeding 3% 3 1.8
Energy costs increase by 5% greater than
budgeted
3 0.4
IJB refer to Council for additional funding to
deliver social work services 
3 2.6
1% variation in Council Tax Income 2 0.7
10% shortfall on Savings delivery 2 0.3
10% variation on General Inflation 3 0.3
Total     8.1 
Page 6

Page 7

1.24 There are currently 30 departmental risks, with a potential annual value totalling
£3.2m, of which 4 are categorised as ‘Likely’.   
Reserves and Balances
1.25 This report summarises the reserves and balances, sets out an analysis of risk
around the adequacy of reserves and balances and proposes a level of
contingency to be held in the General Fund Reserve.   
1.26 At 31 March 2024 the Council had a total of £121.701m usable reserves.  Of this: 
• £2.763m related to the Repairs and Renewals Fund
• £3.197m related to Capital Funds
• £115.741m was held in the General Fund with £107.443m of this balance
earmarked for specific purposes. 
1.27 The Council’s General Fund contingency remains at 2% of net expenditure.  This
monetary level has been adjusted to take account of the revised net revenue
expenditure proposed for 2025-26.  The revised contingency of 2% of net
expenditure amounts to £6.520m.   
1.28 The estimated unallocated General Fund at the end of the financial year is a deficit
of £0.283m.  It may be that this position is improved if the forecast outturn is better
than estimate, however, if the position remains then the Council will be using the
General Fund contingency and a recovery plan will need to be put in place in order
to bring the continency level back to the 2% agreed policy.  
.
CAPITAL PACK 
Capital Plan Summary
1.29 This report details the revisions proposed to the capital plan approved in February
2024 for the period 2025-26 to 2026-27 and extends the capital plan for a further
year to 2027-28. The revisions are based on updated capital funding assumptions,
phasing and cost changes. 
1.30 The Local Government Finance Settlement Circular 10/2024 provided 2025-26
General Capital Grant of £9.666m, excluding effectively ring-fenced or directed
funding of £1.198m.  This represents £0.832m more than previous planning
assumptions.  However, the 2024-25 final General Capital Grant settlement was
£0.047m lower than assumed within the approved Capital Plan.  There is,
therefore, a net increase in capital resources of £2.449m overall for the 3 years
2025-28. 
1.31 The ring-fenced or directed funding of £1.198m, included within the General Capital
Grant, comprises £0.632m for Campbeltown Flood Scheme, £0.391m for Play
Parks and £0.175m for Nature Restoration Fund.  There is also a specific grant of
£0.383m available for Active Travel (formerly known as Walking Cycling & Safer
Streets).  
Page 7

Page 8

1.32 The settlement also provides for additional, non-recurring capital grant funding of
£40m across Scotland in 2025-26 for Climate Emergency, to be included within the
General Capital Grant.  Given that project planning across the programme will
already take cognisance of climate change, as a key consideration, it has not been
necessary to augment planned project expenditure in this respect.  As such, this
funding represents additional available resources for 2025-26.   
1.33 The amount of capital resources effectively top-sliced from the General Capital
Grant and allocated to Private Sector Housing Grant (PSHG) is provided for at
£1.033m per annum over the 3 years 2025-28, similar to previous years’ levels,
although the funded GAE level has reduced to £0.707m in 2025-26.   
1.34 As at 31 December 2024, there is a forecast overspend of £0.117m on the current
2024-27 Capital Plan.  In addition, spending requirements deemed to be essential,
either critical to maintain service delivery, or to comply with legislation or regulation
(Red RAG status risks), total an estimated £0.376m. 
1.35 After taking account of budget pressures and proposed allocations, the balance of
additional capital resources, available for additional capital investment over the 3
years 2025-28 is £3.560m.  This may be augmented by additional borrowing for
capital purposes, with the revenue consequences, in terms of debt charges,
accounted for as part of the annual revenue budget for 2025-26 and future years. 
There is also an option to redirect resources, allocated but not yet committed, to
other priorities, including in respect of the allocation to PSHG at the historic, above
GAE level.   
1.36 A range of currently unfunded investment priorities across council services have
been identified, including in respect of the Roads Maintenance programme for
2025-26, with an estimated funding shortfall of £9m to maintain current level
standards. 
Corporate Asset Management Strategy and Plan
1.37 This report outlines the overall principles, policies and priorities within the Council’s
Asset Management Strategy and Plan. 
1.38 This report identifies key issues for this planning cycle in managing the asset base,
the proposed actions and any risk assets not addressed through the proposed
Capital Plan.  It includes the Priority Investment Plans (PIPS) for each service
asset group. 
2. RECOMMENDATIONS 
2.1 It is recommended that the Council: 
a) Approve the revenue estimates for 2025-26 and that consequently the local
tax requirement estimated at £69.570m is funded from Council Tax. 
Approve the following rates and charges for the year, 2025-26: 
Page 8

Page 9

1. Council Tax to be paid in respect of a chargeable dwelling in Band
“D” of £1,610.85 representing a 8.9% increase.
2. Council Tax to be paid in respect of a chargeable dwelling in each of
the other valuation bands in accordance with Section 74(1) of the
Local Government Finance Act 1992 as amended.
3. Business Rates as determined by Scottish Ministers. 
b) Approve the revenue budget for 2025-26 as set out in the revenue budget
overview report. 
c) Approve a base allocation to the Health and Social Care Partnership of
£81.492m for 2025-26.  Approve indicative base allocations for 2026-27 and
2027-28 of £84.545m.  The level of future years funding is subject to the
level of Scottish Government funding and the Council’s overall financial
position in future years. 
d) Endorse the new management/operational savings as outlined in Appendix
5 of the revenue budget overview report. 
e) Approve the policy savings options for 2025-26 as outlined in Appendix 6 of
the revenue budget overview report and agree that any policy savings
relating to 2026-27 onwards will be considered as part of next year’s budget
process, unless it’s a full year effect of the 2025-26 saving.   
f) Agree to implement the Local Governance (Scotland) Act 2004
(Remuneration) Amendment Regulations 2025 and that the payments from
1 April 2025 be as noted in the table below, accepting that implementation of
these payments will supersede the Council’s decision of 19 May 2022 in
relation to Member’s remuneration. 
Leader £50,063
Civic Head (Provost) £37,458
Senior Councillor (Policy Lead) £37,458
Senior Councillor (Area Chair) £30,038
Senior Councillor (Leader of the Largest
Opposition Group)
£30,038
Councillor £25,982 
g) Consider the funding requests received as set out within Appendix 8 of the
Revenue Budget Overview Report.  
h) Approve the following in relation to fees and charges with effect from 1 April
2025 unless otherwise noted: 
1. Approve the proposals for the fees and charges inflationary increase
of 6% and approve the charges that are over and above inflation. 
Note that this would generate additional income of £0.363m in total.   
2. Approve all other charges as noted within the Fees and Charges
Schedule. 
Page 9

Page 10

3. In respect of Electric Vehicle charging, approve a delegation to the
Director with responsibility for Roads and Infrastructure in
consultation with the Leader and the Policy Lead for Roads,
Transport and Amenity Services, to vary the charge in line with
increasing utility prices.   
i) Note the financial risks analysis. 
j) Approve the contingency level for the General Fund balance at a level of 2%
of net expenditure, equivalent to £6.520m and note the report on reserves
and balances. 
k) Approve the capital plan as set out in Appendix 3, noting that this
incorporates the red risks (£0.376m) and estimated forecast overspend on
the capital plan (£0.117m). 
l) Consider how the total available capital resources of £3.560m are allocated,
noting the unfunded priorities outlined in the report and outlined in the
Priority Investment Plans.   
m) Consider options for increasing the level of investment from the redirection
of resources or from additional borrowing, noting that any additional
borrowing would have an impact on the revenue budget.   
n) Note that a review of the capital arrangements will be undertaken during the
year and reported to Members. 
o) Approve the Corporate Asset Management Strategy and Plan including the
Priority Investments Plans (PIPS). 
3.  IMPLICATIONS 
3.1 Policy – There are policy implications associated with proposals to balance the
revenue budget as well as the policy options that have been subject to employee
consultation.   
3.2 Financial – The report outlines the revenue budget position over 2025-26 to 2029-
30 and the funding and commitments for the capital plan 2025-28. 
3.3 Legal – Any legal implications have and will be considered when developing the
savings options required for the revenue budget.   
3.4 HR – Any HR implications have and will be considered when developing savings
options required for the revenue budget.  There are risks that the capital funding
available will have an impact on the sustainability of the property design team and
the design team within Roads and Amenity Services. 
3.5 Fairer Scotland Duty – See Below 
Page 10

Page 11

3.5.1 Equalities - Equality and Socio-Economic Impact Assessments have been carried
out where appropriate for savings options already agreed or developed. Equality
and Socio-Economic Impact Assessments will be a key consideration in developing
future savings proposals. These assessments can be found on the Councils
website here: Equality and Socio-Economic Impact Assessments (argyll-
bute.gov.uk) 
3.5.2 Socio-Economic Duty - Equality and Socio-Economic Impact Assessments have
been carried out where appropriate for savings options already agreed or
developed. Equality and Socio-Economic Impact Assessments will be a key
consideration in developing future savings proposals. 
3.5.3 Islands Duty – Islands duty is considered as part of the Equality and Socio-
Economic Impact Assessments 
3.6 Climate Change – The Council is committed to addressing climate change and
reviews of how Services are delivered is ongoing within the available budget
resources. 
3.7 Risk – There is a separate report assessing financial risks and there is also an
overall assessment of risk included within the separate report on Reserves and
Balances. In respect of the capital programme, there are risks around the level of
capital receipts, ongoing cost increases, grant funding, future pressures and there
are a number of other risks highlighted within the corporate asset management
plan. 
3.8 Customer Service – There may be some customer service implications arising from
previously agreed savings options and the new policy options.   Future customer
service implications will be considered when developing savings options. 
3.9 The Rights of the Child (UNCRC) - None 
Kirsty Flanagan
Executive Director/Section 95 Officer
13 February 2025 
Councillor Ross Moreland, Policy Lead for Finance and Commercial Services 
For further information please contact Carolyn Earl, Interim Head of Financial Services
carolyn.earl@argyll-bute.gov.uk 
Page 11

Page 12

This page is intentionally left blank

Page 13

ARGYLL AND BUTE COUNCIL COUNCIL
FINANCIAL SERVICES 27 FEBRUARY 2025
REVENUE BUDGET OVERVIEW 2025-26 to 2029-30  
1. EXECUTIVE SUMMARY 
1.1 This report summarises the position with regard to the key issues
surrounding the revenue budget estimates and setting of council tax for
2025-26.  It also provides budget estimates for 2026-27 to 2029-30;
within the report the mid-range estimates are noted, with the best case
and worse case estimates included in Appendix 1. 
1.2  The Local Government Finance Circular 10/2024 was published on 12
December 2024 and provides detail of the provisional total revenue and
capital funding allocations for 2025-26.  The Council’s provisional
General Revenue Grant is £254.995m in addition to Revenue Specific
Grant of £4.539m.       
1.3 Following the publication of Finance Circular 10/2024 there has been
some changes to distributions in addition to previously non-distributed
funding now having an agreed distribution methodology.  These changes
will not be confirmed until the Finance Order is approved on 27 February
2025, but I have reflected what I consider to be a reasonable estimate of
the changes that are expected.  This increases the General Revenue
Grant for 2025-26 to £259.134m and £4.539m in specific grants.   
1.4 The Cabinet Secretary for Finance and Local Government announced
on Tuesday 4 February 2025 that Scottish Government has now agreed
to provide an additional £144m to Local Government in respect of the
Employer’s National Insurance increase and this funding represents
60% of direct staffing costs.  This announcement was made to provide
some certainty for councils as part of their budget setting.  The
increased cost is estimated to be £4.314m for 2025-26 (Council
£3.450m and HSCP £0.864m).  Based on the announcement it is
estimated that we will receive £2.578m of funding. 
1.5 On 29 November 2024 the Council received a letter from the
Department of Environment Food and Rural Affairs (DEFRA) providing
our authority’s estimated payment amount in respect of Extended
Producer Responsibility in relation to Waste Packaging.  Our estimated
payment for 2025-26 is £3.847m. The final allocation will be confirmed in
Autumn 2025.  As it is unclear at this stage what requirements will be
attached to this additional funding, in addition to not knowing the final
allocation until Autumn 2025 it is recommended that only a proportion of
the funding is used to support the 2025-26 budget.  There is a non-pay
inflation pressure for waste/landfill tax for £0.790m and a cost pressure
for BMW Ban for £0.558m and it is recommended that £1.348m is used
Page 13 Agenda Item 2a

Page 14

for these purposes with the remaining £2.499m carried forward to 2026-
27.   
1.6 The Council Tax budget for 2024-25 was set at £63.278m.  Growth has
been increased for 2025-26 to 0.75% to help rebase the position
following a review undertaken by the Assessor at Dunbartonshire and
Argyll and Bute Valuation Joint Board.  Future years growth has been
assumed as 0.25% in the worst case scenario, 0.5% in the mid-range
scenario and 0.75% in the best case scenario.   The 0.75% growth in
2025-26 amounts to an estimated increase of £0.472m.   
1.7 The budget for 2024-25 has been rolled forward into 2025-26 and the
main changes to the 2025-26 base budget are summarised below: 
• Removal of cost pressures relating to 2024-25 only of £0.130m
• Removal of one-off Management/Operational savings of £1.694m
• Release of Contingency back to general fund in 2024-25 of
£0.200m
• Adjustment to re-base contribution to Joint Boards of £0.114m
• Adjustment for re-basing NDR (unbudgeted 2024-25 Rate
poundage increase) of £0.300m
• Adjustment to right-size ferries budgets ensuring income and
expenditure match as this is specific grant funded £0.037m
• Adjustments relating to pay within 2024-25 for Children’s Social
Work (Education service) - £0.063m
• SJC Pay Award 2024-25 - £2.636m
• Pay Award Elected Members 2024-25 - £0.033m
• Settlement Directions (Council services) of £2.992m.   
1.8 The employee cost changes amount to £8.686m.  This relates to
estimated pay inflation for 2025-26, increments, employee base changes
and the increase to employer’s national insurance.   
1.9 Only unavoidable/inescapable inflation has been included within 2025-
26 and this amounts to £2.978m.  This includes utilities, catering
purchases, contract inflation, insurances and landfill tax. 
1.10 There are a number of cost and demand pressures for 2025-26,
amounting to £4.771m summarised as follows:  
• ASN Support - £0.202m
• Maintenance/Repair of School Estate - £0.360m
• Additional Staff Required in Hostels as per Care Inspectorate -
£0.055m 
• Education ICT Network Infrastructure - £0.295m
• Airports Maintenance - £0.040m
• Increase to borrowing costs as a result of investment agreed at
February 2024 - £0.282m
• Universal Credit HB Admin Grant - £0.040m
• NDR Reliefs - £0.068m
Page 14

Page 15

• Compliance with BMW Ban - £0.558m
• Bus Transport Contracts - £1.735m
• Roads and Amenity Services Income Saving no longer achievable - 
£0.100m
• School Transport for ASN pupils - £0.500m
• Loans Charges for Weather Incident - £0.080m
• Insurance premium increases - £0.309m
• Valuation Joint Board requisition increase - £0.147m. 
1.11 The revised payment to the Health and Social Care Partnership, reflects
2024-25 in year adjustments and the net changes to the settlement in
respect of Social Work that we have been directed to pass over to the
Health and Social Care Partnership.  Due to the significant financial
pressure that the Health and Social Care Partnership is facing as a
result of the increasing number of older persons and the increased
demand, it is recommended that Council consider passing over a further
increase to the HSCP, this will pass over a share of the additional
funding that the Council has received without conditions attached.  It is
recommended to pass over £0.370m equivalent to 1% pay award to
ensure that the HSCP have sufficient budget to match the public sector
pay policy for social work staff as well as £0.346m in relation to the
anticipated shortfall in the Employer’s National Insurance funding.  The
revised payment amounts to £81.492m. 
1.12 The budget gap prior to any measures to balance the budget is a deficit
of £10.938m in 2025-26. 
1.13 There are a number of measures to balance the budget that have
previously been agreed at the Council’s budget meeting on 22 February
2024 which have a net effect of reducing the 2025-26 budget gap by
£0.283m. 
1.14 During 2024-25 a review was undertaken of all earmarked reserves to
establish whether they were still required for the originally intended
purpose. The results of the review were presented to Council on 26
September 2024 where Members agreed to release £1.558m of existing
earmarked reserves back to the General Fund to help bridge the budget
gap in 2025-26. This is one-off in nature and therefore reduces the gap
in 2025-26 only. 
1.15 There are a number of other measures to balance the budget that are for
Council approval, summarised as follows:
• General inflationary increase of 6% to fees and charges resulting in
£0.363m of additional income. 
• New management/operational savings amounting to £2.102m.
• New policy options savings amounting to £0.991m. 
1.16 The budget gap after the measures to balance the budget is a deficit of
£2.471m in 2025-26.   
Page 15

Page 16

1.17 The setting of Council Tax should happen on the same day as the
Council sets its revenue budget as once all proposals are considered,
Council Tax is the balancing figure.  The gap outlined in paragraph 1.16
above is based on a 5% Council Tax increase (this is the assumption
that has been in the budget outlook during the year).   In order to get to a
balanced budget, Council will need to increase Council Tax to 8.9%.  
The alternative to increasing Council Tax further is that Council would
need to fund the gap using reserves or other funds held, which would be
a one-off fix, however, Members need to be mindful of the significant
gap in future years as well as the pressures facing the capital plan. 
1.18 The budget gap over the period 2026-27 to 2029-30 across each
scenario is summarised in the table below.   
Budget Gap 2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
Total
£000
Best Case (5,907) (7,343) 262 (344) (13,332)
Mid-Range (9,528) (10,373) (4,424) (5,212) (29,537)
Worst Case (16,131) (16,763) (10,981) (12,124) (55,999) 
1.19 The Council are asked to consider funding requests summarised within
Appendix 8.  Members are asked to give consideration to these requests
and how they would be funded.   
Page 16

Page 17

ARGYLL AND BUTE COUNCIL COUNCIL
FINANCIAL SERVICES 27 FEBRUARY 2025
REVENUE BUDGET OVERVIEW 2025-26 to 2029-30  
2. INTRODUCTION 
2.1 This report summarises the position with regard to the key issues
surrounding the revenue budget estimates and setting of council tax for
2025-26.  It also provides budget estimates for 2026-27 to 2029-30;
within the report the mid-range estimates are noted, with the best case
and worse case estimates included in Appendix 1. 
2.2 Regular reports on the budget outlook 2025-26 to 2029-30 have been
presented to Members throughout the year.  Reports were presented to
the Policy and Resources Committee on 9 May 2024, 15 August 2024,
10 October 2024 and 5 December 2024. 
3. DETAIL 
3.1 Funding 
Finance Settlement 
3.1.1 The Scottish Budget was announced by the Cabinet Secretary for
Finance and Local Government on 4 December 2024 and the Local
Government Finance Circular 10/2024 was published on 12 December
2024. This circular provides detail of the provisional total revenue and
capital funding allocations for 2025-26 (one year only). The provisional
total funding allocations form the basis for the annual consultation
between the Scottish Government and COSLA ahead of the Local
Government Finance (Scotland) Order 2024 presented to the Scottish
Parliament, currently scheduled for the end of February 2025.   
3.1.2 The Circular outlines that the Scottish Government will work in
partnership with local government to implement the budget and the joint
priorities in return for the full funding package worth £15 billion which
includes: 
• A further £524.9 million of funding has now been baselined as
General Revenue Grant, as part of our commitment under the
Verity House Agreement to review ring-fenced funding;
• Additional General Revenue Grant of £289 million to support
local priorities;
• An additional £15 million to support the expansion of Free School
Meals; £125 million for adult social care workers in
commissioned services;
• £10 million to support provision of Free Personal and Nursing
care;
Page 17

Page 18

• An additional £25.7 million to improve pay for early learning and
childcare workers;
• An additional £41 million investment to maintain or restore
teacher numbers to 2023 levels;
• An additional £28 million for additional support for learning; 
• £33 million to support development of people working in
children’s social work;
• £40 million to tackle the climate emergency;
• An additional £10 million to improve play parks for children; and
• An additional £8.6 million resource and £20 million capital to
improve inter-island connectivity. 
Scottish Government Funding for Argyll and Bute Council 
3.1.3 The General Revenue Grant for 2024-25 noted within the February
2024 budget pack was £240.804m.  The General Revenue Grant for
2025-26 is £254.995m as outlined within Finance Circular 10/2024. 
There is also £4.539m of specific grants.   
3.1.4 Following the publication of Finance Circular 10/2024 there has been
some changes to distributions in addition to previously non-distributed
funding now having an agreed distribution methodology.  These
changes will not be confirmed until the Finance Order is approved on 27
February 2025, but I have reflected what I consider to be a reasonable
estimate of the changes that are expected.  This increases the General
Revenue Grant for 2025-26 to £259.134m.  The specific grants remain
unchanged at £4.539m.   
3.1.5 The table below represents the changes in General Revenue Grant
between 2024-25 and 2025-26: 
£000 £000
Funding Budget 2024-25 as per budget
pack 
240,804
SG Policy Commitments – Health and
Social Care:  
Children’s Social Care Pay Uplift 2024-25 180 
LG Pay 2024-25 339 
519
SG Policy Commitments – Council:  
No-one left behind 63 
Council Tax Freeze 2,860 
£62.7m Additional Funding (linked to
Council Tax Freeze)
1,109 
Children’s Social Care Pay Uplift 2024-25 63 
Islands Cost of Living 705 
Climate Intelligence Service 2 
Building Standards Hub (26) 
SNCT Pay Offer 2024-25 456 
Ed Psychology Refund 8 
Page 18

Page 19

Teachers Pensions (change to figure
previously estimated in budget pack)
1,389 
Scottish Welfare Fund 258 
LG Pay 2024-25 1,032 
Teacher Numbers 2,125 
School Milk 15 
Ukraine 91 
Teacher Induction 31 
Temporary Accommodation 15 
10,196
Rounding   (2)
Updated Funding 2024-25 (FC 10/2024)  251,517
Updating of Indicators   882
Change to the floor  (2,951)
Indicators Removed/Reduced  (64)
One-off funding Removed  (599)
SG Policy Commitments – Health and
Social Care 
2,601
SG Policy Commitments – Council  700
Teacher Numbers – share of additional
£41m 
615
Additional Support for Learning – share of
£28m 
392
Teachers Pay – Full year effect 2025-26  223
Islands Cost of Living Fund Increase  17
Changes Column  5,801
Rounding  1
Estimated Settlement 2025-26  259,134 
3.1.6 If you compare the settlement of £259.134m to the finalised cash
funding in 2024-25 the funding has increased by £7.617m – in cash
terms.  However, this is not a like-for-like comparison as there is some
funding in 2024-25 that was one-off and a full year effect of the teachers
pay increase to be reflected.  The like-for-like cash terms comparison is
an increase of £7.993m or 3.19%   
£000 £000
2024-25 Settlement 251,517 
Ukraine (91) 
Temporary Accommodation (15) 
Island Cost of Living (Community Share) (141) 
Scottish Welfare Fund Top Up (258) 
No-one left behind (63) 
Teachers Induction (31) 
2024-25 Settlement for comparison  250,918
2025-26 Settlement 259,134 
Teachers Pay Full Year Effect (223) 
2025-26 Settlement for comparison  258,911
Page 19

Page 20

Increase  7,993
Increase %  3.19% 
3.1.7 Although there has been a cash increase, an element of the increase is
due to additional funding to support Scottish Government Policy. 
Adjusting for these amounts (£2.601m, £0.700m, £0.615m and
£0.392m) the increase reduces to £3.685m or 1.47% for core services.       
3.1.8 In considering the assumption related to future years funding, I have
reflected on the funding change in the last 5 years (at budget time) after
accounting for new policy commitments: 
• 2021-22 funding increase of 0.39%.
• 2022-23 funding decrease of 0.01%
• 2023-24 funding increase of 0.09%
• 2024-25 funding decrease of 0.98%
• 2025-26 funding increase of 1.47% 
3.1.9 The level of increase for 2025-26 was unexpected and it was significant
in comparison to previous years, however, it is difficult to suggest that
we should assume increases like this in future years.  As our Council
relies on the floor mechanism, our funding is always lower than the
Scottish average.  The floor percentage was set at 0.75% this year,
resulting in us receiving 0.75% less than the Scottish average (on
funding lines within the floor, which is the large majority of funding
lines).  Therefore, a flat cash settlement for Scotland would result in us
having a 0.75% reduction.  At this stage I would suggest that in the mid-
range scenario we assume an all Scotland increase of 0.5%, resulting in
a decrease for Argyll and Bute Council of 0.25%.  The best and worst
case scenarios would be varied by 0.50% resulting in range of between
0.75% reduction (worst case) and a 0.25% increase (best case).  This
will be kept under close review and may be updated following the
publication of the Scottish Government’s Medium Term Financial
Strategy which is usually published around May each year.     
Funding for Increase to Employer’s National Insurance
Contributions 
3.1.10 As part of the UK Budget announced on 30 August 2024, the Chancellor
announced an increase to Employers National Insurance Contributions
effective from 1 April 2025.  The rate that employers pay in contributions
will rise from 13.8% to 15% on a worker's earnings above £175 from
April. The threshold at which employers start paying the tax on each
employee’s salary will be reduced from £9,100 per year to £5,000. The
Secretary of State for Scotland wrote to the Council Leader on 1
November 2024 to confirm that the Chancellor will provide funding to
the public sector to support with the additional costs associated with
these changes.  Given the impacts of the policy change are complex,
the Scottish Government settlement for 2025-26 announced in
December does not reflect this additional support. HM Treasury will lead
Page 20

Page 21

a technical process, which will include consultation with Devolved
Governments, to understand requirements in more detail.  During
January, it became apparent that the Barnett Consequentials are likely
to only fund circa 50% of the Employer’s National Insurance increase for
public sector bodies.   
3.1.11 The Cabinet Secretary for Finance and Local Government announced
on Tuesday 4 February 2025 that Scottish Government has now agreed
to provide an additional £144m to Local Government which represents
60% of direct staffing costs.  This announcement was made to provide
some certainty for councils as part of their budget setting.  The
increased cost is estimated to be £4.314m for 2025-26 (Council
£3.450m and HSCP £0.864m).  Based on the announcement it is
estimated that we will receive £2.578m of funding.  The distribution will
not be confirmed until after the Council sets its budget but it is the best
estimate at this stage.  There is no funding for Commissioned Services
and Arms Length Organisations.  The estimated funding is outlined in
the table below: 
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
Estimated NIC
Funding – Council
Share
2,062 2,057 2,052 2,047 2,042
Estimated NIC
Funding – Social
Work Share
516 515 514 513 512
Total 2,578 2,572 2,566 2,560 2,554 
Extended Producer Responsibility (EPR) – Funding from DEFRA 
3.1.12 Extended Producer Responsibility (EPR) is an environmental policy
approach that holds producers accountable for the entire lifecycle of
their products, including the post-consumer phase. Under EPR,
manufacturers are required to take responsibility for the collection,
recycling, and safe disposal of their products once they are no longer in
use.  The key idea behind EPR is to shift the financial and/or physical
responsibility for waste management from municipalities (taxpayers) to
producers (manufacturers). This creates an incentive for companies to
design products that are easier to recycle, more durable, and have less
environmental impact. 
3.1.13 On 29 November 2024 the Council received a letter from the
Department of Environment Food and Rural Affairs (DEFRA) providing
our authority’s estimated payment amount (£3.847m) pursuant to the
draft Producer Responsibility Obligations (Packaging and Packaging
Waste) Regulations 2024 (the Draft Regulations) for the financial year
April 2025 to March 2026.  These draft regulations relate to Extended
Producer Responsibility for Packaging.  The indicative payment amount
is provisional and subject to further review and adjustment.  Payments
provided via EPR for packaging are intended to enable local authorities
Page 21

Page 22

to maximise the collection and recycling of packaging materials in order
to support the transition to a circular economy. The final allocation will
be confirmed in Autumn 2025.  
3.1.14 It has been confirmed that the funding will be paid direct from DEFRA
and is additional to the Scottish Government settlement in 2025-26, if it
is spent on waste management.  It is uncertain if the Scottish
Government settlement may be adjusted in future years on the basis
that we continue to receive funding from DEFRA.   
3.1.15 As it is unclear at this stage what requirements will be attached to this
additional funding, what further pressures there may be in future years,
in addition to not knowing the final allocation until Autumn 2025 it is
recommended that only a proportion of the funding is used to support
the 2025-26 budget.  There is a non-pay inflation pressure for
waste/landfill tax for £0.790m and a cost pressure for BMW Ban for
£0.558m and it is recommended that £1.348m is used for these
purposes with the remaining £2.499m carried forward to 2026-27.  No
assumption has been made around recurring funding at this stage
although it is hoped funding will continue without any downward
adjustment to the Scottish Government settlement in respect of this.   
Council Tax 
3.1.16 The Council Tax base for 2024-25 was set at £63.278m which reflected
no inflationary increase as agreed by the Council on 15 April 2024. This
is the starting position for 2024-25.   
3.1.17 Financial Services have concluded a review of Council Tax income
received on second homes and projections indicate receipts will be
£0.328m over budget.  This is a positive position and is very close to the
original budget agreed in February, however, Members will be aware
that the budget was amended in April in response to the level of
representations that had been received.  It is assumed that a similar
level of income will be received in future years and the budget outlook
can be updated to reflect this. 
3.1.18 In terms of Council tax growth, following a review undertaken by the
Assessor at Dunbartonshire and Argyll and Bute Valuation Joint Board,
a number of self catering properties have been added to the Council
Tax register.  Growth has been increased for 2025-26 to help rebase
the position and for future years growth has been assumed as 0.25% in
the worst case scenario, 0.5% in the mid-range scenario and 0.75% in
the best case scenario.   
3.1.19 As reported in the previous budget outlook reports, as part of the 2023-
24 budget setting process a business process review was undertaken of
the Revenues and Benefits Service where one of the outcomes was
anticipated increased Council Tax recoveries equating to £0.200m in
2025-26 which have been built into the budget outlook. This is a
reduction of £0.149m from 2024-25 as recoveries are expected to be
Page 22

Page 23

higher in the first two years of inception dropping down to an almost
steady state from 2025-26 onwards. 
3.1.20 The estimated Council Tax income over the next five years (excluding
future years Council Tax increases, which are dealt with later in the
report) is noted in the table below. 
Draft
2025-26
£000
Mid-
Range
2026-27
£000
Mid-
Range
2027-28
£000
Mid-
Range
2028-29
£000
Mid-
Range
2029-30
£000
Council Tax
Base
63,278 63,278 63,278 63,278 63,278
Council Tax
Growth
472 789 1,108 1,428 1,750
Council Tax
income on
Second
Homes in
excess of
budget
328 328 328 328 328
Adjustment to
additional
Council Tax
recoveries
(para 3.1.14)
(149) (147) (145) (143) (143)
Total
Council Tax
Income 
63,929 64,248 64,569 64,891 65,213 
General Fund 
3.1.21 As reported in the budget pack in February 2024, reduced employer
contribution rates payable to Strathclyde Pension Fund will result in
one-off savings in 2024-25 and 2025-26. It was agreed that the saving
in each of these years be transferred to the General Fund, with some
being used to fund capital expenditure. £9.928m of savings will be
transferred to reserves in 2025-26 in relation to this, this amount relates
to the saving for the Council and the HSCP. 
3.1.22 It was also agreed at the budget meeting in February 2024 that £2m of
the pension fund gain would be released each year for a period of 3
years (2024-25 through to 2026-27) in order to help bridge the budget
gap.   
Total Funding 
3.1.23 The table below summarises the total estimated funding over the next
five years within the mid-range scenario.   
Page 23

Page 24

Draft
2025-26
£000
Mid-
Range
2026-27
£000
Mid-
Range
2027-28
£000
Mid-
Range
2028-29
£000
Mid-
Range
2029-30
£000
Scottish
Government
funding as per
Circular
259,134 258,486 257,840 257,195 256,552
Assumed
funding from
Employers NIC
increase
2,578 2,572 2,566 2,560 2,554
Extended
Producer
Responsibility
(EPR)
Indicative
Funding
3,847 tbc tbc tbc tbc
Earmark EPR
funding for
future
pressures
(2,499) 2,499 0 0 0
Council Tax
income
63,929 64,248 64,569 64,891 65,213
Transfer to
Reserves in
relation to
Strathclyde
Pension Fund
(9,928) 0 0 0 0
Released
Strathclyde
Pension Fund
Gain
2,000 2,000 0 0 0
Total Funding  319,061 329,805 324,975 324,646 324,319 
3.2  Base Budget
3.2.1 As with previous years the base budget for 2025-26 is the current years
approved budget adjusted for any:
• one-off items included within 2024-25 that are not carried forward
into 2025-26;
• previously agreed items for future years; and
• other adjustments since the 2024-25 budget was agreed. 
3.2.2 As previously reported in the budget outlook report last year, funding
was received during 2024-25 in respect of the Children’s Social Care
pay uplift of which £0.063m relates to staff within Education and
therefore the base needs adjusted for his amount.   
Page 24

Page 25

3.2.3  The SJC and Chief Officers pay awards have been implemented for
2024-25 with Councils having to provide 3.2% towards the pay award
and Scottish Government providing the remaining funding.  The
Teachers had a pay award already agreed up to 31 July 2024 as part of
a previous 28 month deal and they have now accepted a 4.27% pay
offer.  As with the SJC and Chief Officers, Councils are expected to fund
up to 3.2% of the offer with SG funding for the remainder.  The
employee budgets for 2024-25 have been rebased due to the 2024-25
pay award.   
3.2.4 On 4 April 2024 a Scottish Statutory Instrument was passed regarding
increasing councillors pay with effect from 1 April 2024, the detail of
which was presented to Council on 25 April. The financial impact of this
is an increase of £0.033m which has been adjusted for as it was not
included in the 2024-25 base budget. 
3.2.5 Although the majority of the funding from the Scottish Government is not
strictly ring-fenced, there are elements of the funding that are directed to
deliver on Scottish Government policy.   The base budget needs to be
adjusted to reflect the additional costs for delivering on these directions
and the budget increase is limited to the funding provided. There is also
a decrease in funding relating to the creation of a building standards
hub, however, this can be funded from increases to fees and charges
within the service.   The adjustments for the Council are listed in the
table below and it should be noted that any relating to the HSCP are
detailed at section 3.6 of the report. 
Increase /
(Decrease)
£000
Early Learning and Child Care Real Living Wage for
Commissioned Providers
138
School Meals 202
Teacher Numbers (previous specific grant)  2,125
CYP Community Mental Health 235
Scottish Assessors Barclay Implementation 2
Discretionary Housing Payments – Uplift to Grant 123
ASN Additionality (Difference between additional
funding and cost pressure in 2025-26)
190
Building Standards Hub (23)
Total 2,992 
3.2.6 The revised base budget is noted in the table below.   
Draft
2025-26
£000
Mid-
Range
2026-27
£000
Mid-
Range
2027-28
£000
Mid-
Range
2028-29
£000
Mid-
Range
2029-30
£000
Base Budget 2024-
25
301,965 301,965 301,965 301,965 301,965
Page 25

Page 26

Adjust for one-off
2024-25 cost
pressures
(130) (130) (130) (130) (130)
Adjust for one-off
2024-25
Management/
Operational savings
1,694 1,694 1,694 1,694 1,694
Release of
contingency not
required back to the
general fund
(200) (200) (200) (200) (200)
Adjustment to Joint
Boards
(114) (114) (114) (114) (114)
NDR Poundage
Increase 2024-25
300 300 300 300 300
Right-Size Ferries
budget matching
income and
expenditure
37 37 37 37 37
2024-25 Pay Base
Adjustment -
Children’s Social
Care Pay Uplift –
Education 
63 63 63 63 63
2024-25 Pay Base
Adjustments - Staff
2,636 2,636 2,636 2,636 2,636
2024-25 Pay Base
Adjustment –
Elected Members
33 33 33 33 33
Settlement
Directions
2,992 2,992 2,992 2,992 2,992
Revised Base
Budget
309,276 309,276 309,276 309,276 309,276 
3.3 Employee Costs 
Pay Inflation Estimates 
3.3.1 For future years pay awards for SJC staff, Teachers and Chief Officers,
the previous mid-range assumption was a 2% increase to pay.  The
Public Sector Pay Policy was published alongside the Scottish Budget
and it sets out a multi-year framework of a 9% pay envelope covering
2025-26, 2026-27 and 2027-28.  It would be prudent to budget for 3%
across each of the three years (in both the best case and mid-range
scenarios).  The worst case scenario assumes a 5% increase.  For
2028-29 and 2029-30, the best case scenario has been reduced to 2%,
mid-range remains at 3% and worst case remains at 5%.   Negotiations
have not commenced yet for 2025-26 and there remains a risk that the
pay award is higher than budgeted.  Every 1% over and above what is
budgeted would add an additional pressure of circa £1.5m for Council
staff (excluding HSCP). 
Page 26

Page 27

3.3.2 In terms of Councillors pay from 1 April 2025, The Scottish Local
Authorities Remuneration Committee has undertaken an independent
review of councillor remuneration with a number of recommendations
proposed in respect of pay for all Councillors.  Regulations have now
been passed in Parliament and the cost of implementing the Local
Governance (Scotland) Act 2004 (Remuneration) Amendment
Regulations 2025 is estimated at £0.206m and Members will be asked
to agree to implement these Regulations as per recommendation (f). 
Detailed Employee Costing Exercise 
3.3.3 Financial Services have populated salary templates with details of the
current establishment and where necessary liaised with budget holders
to confirm their staff.  The templates calculate the next years pay bill
including superannuation and national insurance contributions.  The
cost of the employees from the template is compared to the previous
year and reasons for differences explained. 
3.3.4 In terms of the level of employee budgets for 2025-26, the expectation
would be that the budget would reflect the 2024-25 budget plus any
increase due to incremental progression, pay inflation and any other
unavoidable employee cost increases less previously approved
employee budget savings.  For 2025-26 there is an overall increase in
the employee budget base of £0.133m.   (excluding Social Work). 
There are a number of small variances to the employee base, both
positive and negative as well as an increase as a result of posts within
the Rural Growth Deal team now made permanent. 
Increments 
3.3.5 The cost of employee increments have been updated following the
salary template exercise.  The employee increments for 2025-26 equate
to £0.599m.  For future years it has been assumed that the best case
will be half the previous year cost with mid-range and worst case, equal
to the cost in 2025-26.   
Strathclyde Pension Fund 
3.3.6 As detailed in the budget pack presented to Council in February 2024,
the employer contribution rate paid to the Strathclyde Pension Fund
decreased/will decrease from 19.3% to 6.5% in both 2024-25 and 2025-
26 and thereafter rise to a sustainable long-term rate of 17.5% from
2026-27. The reduction in the first 2 years equates to reduced costs of
£6.875m per annum relating to Council employees (excluding HSCP).
From 2026-27 the costs will rise again to 17.5% therefore this increase
is required to be built into projections from 2026-27 onwards. 
Teacher Numbers 
3.3.7  In 2024-25 Scottish Government removed £145.5m from the General
Revenue Grant and issued this as a specific grant, conditional on
Page 27

Page 28

maintaining teacher numbers at the level set out in each Council’s grant
letter.  For Argyll and Bute Council the funding amounted to £2.125m
and there was an expectation that we maintain 848 teachers.  As part of
the Scottish Budget in December 2024 it was agreed that the funding
would not be withheld and was returned to General Revenue Grant and
this remains the case for 2025-26, however, for 2025-26, there is again
an expectation that we will maintain 848 teachers, even although this is
not the number we require to staff our schools.  The budget equates to
837 FTE teachers which is slightly short of the target, however, officers
are of the view that this is a risk based approach and should we not be
able to deliver on our target, there will be mitigating circumstances to
justify.  The Scottish Government have indicated mitigations that will be
taken into consideration and include changes to pupil roll and inability to
fill posts.  To budget for 848 teachers would result in an additional
budget requirement of circa £0.800m and this is deemed to be both
unaffordable and not required.   There remains a risk that if we do not
maintain the teacher numbers some funding could be withheld.   
Employer’s National Insurance Increase 
3.3.8 With reference to paragraph 3.1.10 and 3.1.11, as part of the UK
Budget there are increases to Employers National Insurance
Contributions effective from 1 April 2025.  The increase was originally
anticipated to be fully funded, however, the Cabinet Secretary for
Finance and Local Government announced on Tuesday 4 February
2025 that Scottish Government has now agreed to provide an additional
£144m to Local Government which represents 60% of direct staffing
costs.  The cost for Council staff amounts to £3.450m and is
summarised in the table below.  It should be noted that these figures
exclude Social Work.   
£000
Increase from reduction in threshold 2,156
Increase from increase in rate from
13.8% to 15%
1,294
Total 3,450 
3.3.9 The changes to the employee budgets estimated over the next five
years for Council services are summarised in the table below.  The
employee cost increases relating to Social Work within the Health and
Social Care Partnership are summarised within paragraph 3.6.9. 
Draft
2025-26
£000
Mid-
Range
2026-27
£000
Mid-
Range
2027-28
£000
Mid-
Range
2028-29
£000
Mid-
Range
2029-30
£000
Pay Award 2025-
26
4,298 9,050 13,944 18,985 24,177
Full year effect of
2024-25 pay
0 496 496 496 496
Page 28

Page 29

award for teachers
in 2025-26 base
SLARC
Recommendations
– Elected
Members
206 206 206 206 206
Change to
employee base for
2025-26
133 133 133 133 133
Increments 599 1,194 1,789 2,384 2,979
Increase to
Employers
National Insurance
3,450 3,450 3,450 3,450 3,450
Increase in costs
after one-off
reduction in
Strathclyde
Pension Fund rate
ceases
0 6,875 6,875 6,875 6,875
Total Employee
Increases
8,686 21,404 26,893 32,529 38,316 
3.4 Non-Pay Inflation 
3.4.1 The position remains that only unavoidable/inescapable inflation has
been included for 2025-26, this is with a view to only including a
provision in the budget for an inflationary increase where it is absolutely
required. 
3.4.2 The table below summarises the non-pay inflation in the mid-range
scenario for Council services with more detail available in Appendix 2. 
The non-pay inflation increases relating to Social Work within the Health
and Social Care Partnership are summarised within paragraph 3.6.9. 
Inflation Category 2025-26
Previous
estimates
(Dec 2024)
£000
2025-26
Updated
estimates 
£000
Increase/
(Decrease) 
£000
Utilities - Electricity, Gas,
Oil, Water
175 157 (18)
Street Lighting Electricity 30 27 (3)
Vehicle Fuel 34 30 (4)
Vehicle Charging Point
Electricity
6 6 0
Central Repairs-Outside
Contractors
79 72 (7)
Waste/Landfill Tax 797 790 (7)
NPDO/HUB Schools 404 370 (34)
Community Pool Subsidies 25 25 0
Residential Schools 36 30 (6)
Page 29

Page 30

Pre-Primary Partner
Providers
197 197 0
ICT 214 217 3
Catering Purchases and Milk 66 59 (7)
Insurance 459 459 0
Bitumen – Roads 16 14 (2)
Contribution to Joint Boards 39 35 (4)
Annual External Audit Fee 10 9 (1)
Public Transport 237 237 0
School Transport 153 153 0
SEPA – Waste Disposal 7 7 0
Non-Domestic Rates 162 10 (152)
Strathclyde Passenger
Transport Requisitions
0 12 12
Refuse Vehicle Ferry Fares 0 13 13
Housing Support Contracts 0 49 49
Total 3,146 2,978 (168) 
3.4.3 In terms of the budget outlook for 2026-27 to 2029-30 the estimated
impact of unavoidable / inescapable non-pay inflation has been
calculated based on projected inflation rates at this point in time. The
worst case scenario is 0.5% higher than the value included within the
mid-range and the best case is 0.5% less than the mid-range scenario. 
An allowance for unidentified inflation has been included from 2026-27
onwards at £0.250m per annum within the mid-range scenario and
£0.500m per annum within the worst case scenario. 
3.4.4 The overall additional budget requirement for non-pay inflation
estimated over the next five years is summarised in the table below.
Further detail is provided in Appendix 2.  The estimated inflationary
increases relating to Social Work within the Health and Social Care
Partnership are summarised within paragraph 3.6.9. 
Draft
2025-26
£000
Mid-
Range
2026-27
£000
Mid-
Range
2027-28
£000
Mid-
Range
2028-29
£000
Mid-
Range
2029-30
£000
Unavoidable/
inescapable
Non-Pay
Inflation
2,978 5,723 8,610 11,654 14,868 
3.5 Cost and Demand Pressures 
3.5.1 For a number of years, services have worked on the basis of having to
contain any cost and demand pressures within current resources where
possible.  An allowance for unidentified cost and demand pressures has
been included from 2026-27 onwards at £0.250m per annum in the best
case scenario in the best case scenario, £0.500m per annum within the
Page 30

Page 31

mid-range scenario and £1.000m per annum within the worst case
scenario. 
3.5.2 Since the Policy and Resources Committee on 5 December 2024 the
following changes have been made to the cost and demand pressures: 
• NEW – Additional Staffing requirement in hostels - £0.055m
• Amended – Waste BMW Ban – an updated financial appraisal
has been completed in respect of the cost pressure as a result of
the Waste BMW ban.  The pressure for 2025-26 has been
increased by £0.096m with larger increases in future years.   
• NEW – Airports - £0.040m – increase to maintenance budget
which is no longer sufficient.  
• NEW – Valuation Joint Board – increase to requisition as advised
by letter on 30 January 2025. 
3.5.3 The estimated cost and demand pressures identified for Council
services are noted in the table below, with further detail provided in
Appendix 3.  The cost and demand pressures relating to Social Work
within the Health and Social Care Partnership are summarised within
paragraph 3.6.9. 
Draft
2025-26
£000
Mid-
Range
2026-27
£000
Mid-
Range
2027-28
£000
Mid-
Range
2028-29
£000
Mid-
Range
2029-30
£000
ASN Support 202 410 624 624 624
Maintenance/Repair
of School Estate
360 360 360 360 360
Additional Staff
Required in Hostels
as per Care
Inspectorate
55 55 55 55 55
Election costs 0 0 350 0 0
Education ICT
Network
Infrastructure 
295 295 348 348 348
Local Development
Plan
0 50 0 0 0
Airports
Maintenance
40 40 40 40 40
Increase to
borrowing costs as
a result of
investment agreed
at February 2024.  
282 282 282 282 282
Universal Credit –
HB Admin Grant
40 80 120 160 200
Civica Revenue and
Benefits System
0 0 63 63 63
NDR Reliefs 68 68 68 68 68
Compliance with
BMW Ban
558 3,037 3,609 3,609 3,609
Page 31

Page 32

Bus Transport
Contracts
1,735 2,003 2,003 2,003 2,003
Roads & Amenity
Services Income -
Saving no longer
achievable 
100 100 100 100 100
School Transport
for ASN pupils has
seen a significant
increase due to an
increase in number
of pupils requiring
school transport as
well as increased
costs.  
500 500 500 500 500
Loans Charges for
Weather Incident as
agreed at P&R
Committee
80 80 80 80 80
Migration from
Skype for Business
to Teams
Telephony
0 63 300 300 300
Insurance premium
increases
309 309 309 309 309
Valuation Joint
Board requisition
increase
147 402 448 448 448
Allowance for
pressures in future
years
0 500 1,000 1,500 2,000
Total Cost and
Demand
Pressures
4,771 8,634 10,659 10,849 11,389 
3.6 Health and Social Care Partnership (HSCP) 
3.6.1 The Council agreed an allocation to the HSCP of £78.611m for 2024-25
at its meeting on 22 February 2024 as well as an indicative flat cash
allocation for 2025-26.  The indicative allocation for 2026-27 onwards
increases by £3.053m to account for the cessation of the one-off
employer contribution rate saving relating to the Strathclyde Pension
Fund. 
3.6.2 As previously reported in the budget outlook report last year, funding
was received during 2024-25 in respect of the Children’s Social Care
pay uplift of which £0.180m is a straight pass through to the HSCP and
will therefore increase their payment each year by this amount.   
Page 32

Page 33

3.6.3 Additional funding was allocated by the Scottish Government for the
SJC pay award during 2024-25.  As in previous years we agreed to
pass over a proportionate share of this funding to the HSCP and this
amounts to £0.339m within 2024-25 and increases their future
payments by the same amount.   
3.6.4 It was agreed during 2024-25 that the Hostels should transfer from the
Health and Social Care Partnership to the Education Service.  As a
result of this, the budgets that were included in the indicative 2025-26
payment will be removed.  This will have no bottom line impact on the
HSCP.   
3.6.5 The Local Government Finance Circular 10/2024 included additional
funding to be passed over to the Health and Social Care Partnership for
2025-26. Funding for Mental Health Recovery and Renewal passed
over to the HSCP in 2021 was time limited and ended in 2024-25 and
therefore now needs to be removed from payment to HSCP.  The net
amount to be passed over to the HSCP is summarised below: 
• £125m for adult social care workers in commissioned services –
ABC share £2.344m.
• £10m to support provision of Free Personal and Nursing Care –
ABC share £0.257m.
• £3.7m for Mental Health Recovery and Renewal funding has
come to an end – ABC share passed to HSCP in 2021 was
£0.066m.   
3.6.6 The Health and Social Care Partnership had been estimating a 2%
increase in respect of pay for Social Work staff, this is same as the
assumption that was made for Council staff.  The Public Sector Pay
Policy was published alongside the Scottish Budget and it sets out a
multi-year framework of a 9% pay envelope covering 2025-26, 2026-27
and 2027-28.  It would now be prudent to increase the budget
assumption from 2% to 3%.  As the Council received additional funding
without conditions attached, this has enabled the increase to be built
into future estimates for Council staff and it is recommended that the
Council fund the extra 1% for Social Work staff in 2025-26 in light of the
significant financial challenges that the IJB are currently facing.  The
increase to the assumption by 1% equates to £0.370m.   
3.6.7 As outlined in paragraph 3.1.10 and 3.1.11, as part of the UK Budget
there are increases to Employers National Insurance Contributions
effective from 1 April 2025.  The increase for Social Work staff is
summarised in the table below.   
£000
Increase from reduction in threshold 553
Increase from increase in rate from
13.8% to 15%
311
Total 864
Page 33

Page 34

Whilst initially it was expected that this would be fully funded by UK
Government via the Barnett Consequentials, this is now not the case. 
The Cabinet Secretary for Finance and Local Government announced
on Tuesday 4 February 2025 that Scottish Government has now agreed
to provide an additional £144m to Local Government which represents
60% of direct staffing costs.   It is recommended that the Council
allocate budget to the HSCP for the 40% shortfall, recognising the
significant financial challenges the HSCP are currently facing.  If we
assume 60% funding from Scottish Government and 40% funding from
the Council, the payment to the HSCP will increase by £0.864m, equal
to the estimated additional cost.   
3.6.8 The revised payment to the Health and Social Care Partnership is noted
below. 
Draft
2025-26
£000
Mid-
Range
2026-27
£000
Mid-
Range
2027-28
£000
Mid-
Range
2028-29
£000
Mid-
Range
2029-30
£000
Base Payment
(as per Budget
2024)
78,611 81,664 81,664 81,664 81,664
2024-25
Children’s
Social Care
funding
180 180 180 180 180
2024-25 share
of SJC pay
award funding
339 339 339 339 339
Hostels
Transfer 
(1,407) (1,407) (1,407) (1,407) (1,407)
Settlement
Changes
2,535 2,535 2,535 2,535 2,535
To fund 1%
increase to
pay award
assumption
370 370 370 370 370
Employer’s
National
Insurance
Funding (60%
SG and 40%
Council)
864 864 864 864 864
Payment to
HSCP
81,492 84,545 84,545 84,545 84,545 
3.6.9 Members should note that the payment assumes that the HSCP will
absorb any inflationary and cost and demand pressures.  The latest
estimated inflation and cost and demand pressures for Social Work
Page 34

Page 35

have been discussed with the HSCP Chief Financial Officer. The mid-
range estimates are summarised in the table below and further detail is
contained within Appendix 4.  These pressures are not included within
the Council’s budget gap but are included within this report for
information. Note that these only extend to three years rather than the
five years that the Council’s budget outlook extends to.  Extending the
outlook to five years is a decision for the HSCP to take and their Chief
Financial Officer is of the view that a five year planning window is not
appropriate at the current time. 
Draft
2025-26
£000
Mid-
Range 
2026-27
£000
Mid-
Range
2027-28
£000
Increase to pay base due to
2024-25 pay award (partly
funded)
384 384 384
Pay Inflation at 3%  1,197 2,430 3,700
Pay Increments 203 406 609
Increase to employee base 282 282 282
ENICs increase 864 864 864
Non-Pay Inflation 875 1,830 2,844
Non-Pay Inflation on NHS
posts recharged to Social
Work
90 182 277
Older People Demand Growth 500 1,000 1,500
Younger Adults Demand
Growth
0 121 184
Mental Health Budget
Adjustment
0 131 199
Budget Adjustment to reflect
2024-25 levels of overspend
on Older Adult Services
2,000 2,000 2,000
Looked after Children – to
reflect significant increase in
demand for placements in
external residential care.
700 700 700
Mental Health Budget
Adjustment
0 265 397
Allowance for unknown cost
and demand pressures
200 400 600
Social Work Pressures 7,295 10,995 14,540
Pay Award 2024-25 funding
from Council (see para 3.6.3)
(339) (339) (339)
Pay Inflation funding from
Council for 2025-26 (see para
3.6.6)  
(370) (370) (370)
ENICs funded 60% SG, 40%
Council (see para 3.6.7)
(864) (864) (864)
Page 35

Page 36

Net Social Work Pressures
after Council funding
5,722 9,422 12,967 
3.7 Live Argyll 
3.7.1 During the year the management fee for Live Argyll was assumed to
change in line with the Scottish Government funding variance.  A saving
is now included within the policy savings options (see paragraph 3.9.5)
and therefore within this section the management fee is assumed to
remain flat cash across the years.  There is also a change from 2026-27
onwards to increase the management fee by £0.118m to account for the
cessation of the one-off employer contribution rate saving relating to the
Strathclyde Pension Fund.   
Draft
2025-26
£000
Mid-
Range
2026-27
£000
Mid-
Range
2027-28
£000
Mid-
Range
2028-29
£000
Mid-
Range
2029-30
£000
Management
Fee Base
Change 
0 0 0 0 0
Cessation of
SPF
contribution rate
saving
0 118 118 118 118
Change to
Management
Fee
0 118 118 118 118 
3.8 Budget Gap PRIOR to Measures to Balance the Budget 
3.8.1 The budget gap prior to factoring in any previous savings decisions or
potential options towards balancing the budget is summarised in the
table below.     
Draft
2025-26
£000
Mid-
Range
2026-27
£000
Mid-
Range
2027-28
£000
Mid-
Range
2028-29
£000
Mid-
Range
2029-30
£000
Base Budget 309,276 309,276 309,276 309,276 309,276
Employee Cost
Changes
8,686 21,404 26,893 32,529 38,316
Non-Pay
Inflation
2,978 5,723 8,610 11,654 14,868
Cost and
Demand
Pressures
4,771 8,634 10,659 10,849 11,389
(Decrease)/
Increase to
HSCP allocation
4,288 7,341 7,341 7,341 7,341
Page 36

Page 37

(not already in
Council base)*
Adjustment to
Live Argyll
Payment (prior
to savings)
0 118 118 118 118
Total Net
Expenditure
329,999 352,496 362,897 371,767 381,308
Total Funding 319,061 329,805 324,975 324,646 324,319
Budget
Surplus / (Gap)
Cumulative
(10,938) (22,691) (37,922) (47,121) (56,989) 
*The transfer of hostels from HSCP to Education does not need to be
included in the budget gap calculation as this budget is included within
base budget. 
3.9 Measures to Balance the Budget 
3.9.1 Some of the policy options that were agreed at the Council meeting on
22 February 2024 impacted on 2025-26 and beyond.   These are now
factored into the budget outlook, reducing the budget gap. 
3.9.2 During 2024-25 a review was undertaken of all earmarked reserves to
establish whether they were still required for the originally intended
purpose. The results of the review were presented to Council on 26
September 2024 where Members agreed to release £1.558m of existing
earmarked reserves back to the General Fund to help bridge the budget
gap in 2025-26. This is one-off in nature and therefore reduces the gap
in 2025-26 only. 
3.9.3 There is a separate report included in the budget pack which relates to
fees and charges together with the detailed schedule of charges for
2025-26.  The general inflationary increase to fees and charges is
proposed at 6% for 2025-26.  The general inflationary increase would
give additional income of £0.363m.  There is no general inflationary
increase applied to Piers and Harbours to ensure that any income
generated is not in excess of expenditure.   In terms of the outlook for
2026-27 to 2029-30, fees and charges have been estimated at a 6%
increase in the mid-range scenario (3% in worst case and 9% in best
case). 
3.9.4 Savings options totalling £3.093m for 2025-26 were included in the
Budget Outlook report presented to the Policy and Resources
Committee on 5 December 2024.  The options have been categorised
as either: 
• Management / Operational – meaning they do not result in either
redundancies or any change in policy and can be implemented
without Council approval
Page 37

Page 38

• Policy – meaning they require Council approval due to having
staff or policy implications. 
The management/operational savings are set out in Appendix 5 to this
report and the proposed policy savings are set out in Appendix 6
alongside savings templates for each of the policy savings options.   
3.9.5 A summary of the savings identified are noted in the table below.  The
changes since the report in December are summarised below:
• New Management/Operational Saving – Elections - £0.032m in
25-26
• New Policy Saving – Governance - £0.033m in 25-26
• Property Saving moved from Policy to Management/Operational -
£0.050m in 25-26. 
Saving
Type
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
Management/
Operational 2,102 990 1,029 1,029 1,029
Policy 991 1,527 1,627 1,627 1,627
Total 3,093 2,517 2,656 2,656 2,656 
3.9.6 The number of staff affected by potential redundancy required the
Council to undertake a statutory 45 day consultation.  This has been
concluded in accordance with the Council’s redundancy policy and
procedures seeking to avoid compulsory redundancy wherever
possible. 
3.9.7 Throughout the year there was as assumption of an increase to Council
Tax of 5% in the mid-range scenario across each of the next 5 years. 
This estimate is included within the budget gap figure in Section 3.10.   
3.9.8 The table below summarises the proposed measures to balance the
budget in the mid-range scenario. 
Draft
2025-26
£000
Mid-
Range
2026-27
£000
Mid-
Range
2027-28
£000
Mid-
Range
2028-29
£000
Mid-
Range
2029-30
£000
Previously agreed
Policy Savings 
248 724 1,360 1,829 1,943
Previously agreed
Management/
Operational Savings 
35 35 35 35 35
Earmarked Reserves
released to the
General Fund
1,558 0 0 0 0
Fees and Charges
Increase
363 748 1,156 1,588 2,046
NEW Management/
Operational Options 2,102 990 1,029 1,029 1,029
Page 38

Page 39

NEW Policy Options 991 1,527 1,627 1,627 1,627
Council Tax Increase  3,170 6,530 10,075 13,812 17,753
Total Measures to
Balance the Budget
8,467 10,554 15,282 19,920 24,433 
3.10 Budget Gap AFTER Measures to Balance the Budget 
3.10.1 The table below summarises the estimated budget gap in the mid-range
scenario. 
Draft
2025-26
£000
Mid-
Range
2026-27
£000
Mid-
Range
2027-28
£000
Mid-
Range
2028-29
£000
Mid-
Range
2029-30
£000
Budget Gap Prior
to Measures to
Balance Budget
(10,938) (22,691) (37,922) (47,121) (56,989)
Savings
Measures 
8,467 10,554 15,282 19,920 24,433
Estimated
Budget Surplus /
(Gap)
Cumulative
(2,471) (12,137) (22,640) (27,201) (32,556)
Estimated
Budget Surplus /
(Gap) In Year
(2,471) (9,666) (10,503) (4,561) (5,355) 
3.10.2 The setting of Council Tax should happen on the same day as the
Council sets its revenue budget as once all proposals are considered,
Council Tax is the balancing figure.  The gap shown in the table above
is based on a 5% Council Tax increase(this is the assumption that has
been in the budget outlook during the year).   In order to get to a
balanced budget, Council will need to increase Council Tax to 8.9%.  
The alternative to increasing Council Tax further is that Council would
need to fund the gap using reserves or other funds held, which would be
a one-off fix, however, Members need to be mindful of the significant
gap in future years as well as the pressures facing the capital plan.  
The table below summarises the position across the years if Council tax
is increased by 8.9% in 2025-26 reverting back to an estimated 5% in
future years.   
Draft
2025-26
£000
Mid-
Range
2026-27
£000
Mid-
Range
2027-28
£000
Mid-
Range
2028-29
£000
Mid-
Range
2029-30
£000
Budget Surplus /
(Gap) in Year as
noted in 3.10.1
above
(2,471) (12,137) (22,640) (27,201) (32,556)
Council Tax
additional income
2,471 2,609 2,739 2,876 3,019
Page 39

Page 40

based on a
further 3.9%
increase (total
Council Tax of
8.9%)
Final Budget
Surplus / (Gap)
Cumulative
0 (9,528) (19,901) (24,325) (29,537)
Final Budget
Surplus / (Gap)
In Year 
(9,528) (10,373) (4,424) (5,212) 
3.10.3 Appendix 7 provides a summary of the draft budget for 2025-26 at
service level.     
3.10.4 Members should note the recurring nature of proposals and how this
impacts future year’s budget estimates.  As an example, should Council
reject a budget saving that is recurring in nature, say for £0.150m and
replace with a one-off measure, the next year budget gap will be
increased by £0.150m.   
3.11 Balancing Future Years Budget 
3.11.1 The budget gap in the period 2026-29 to 2029-30 across each scenario
is summarised in the table below. 
Budget Gap 2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
Total
£000
Best Case (5,907) (7,343) 262 (344) (13,332)
Mid-Range (9,528) (10,373) (4,424) (5,212) (29,537)
Worst Case (16,131) (16,763) (10,981) (12,124) (55,999) 
4. CONCLUSION 
4.1 This report summarises the position with regard to the key issues
surrounding the revenue budget and setting of council tax for 2025-26. 
It also provides estimates of the budget outlook for the period 2026-27
to 2029-30. 
4.2 All proposals included within this report result in a balanced budget for
2025-26.   
4.3 There remains a significant budget gap in future years and officers will
continue to explore options to generate future savings or additional
income.   
4.4 The Council are asked to consider the funding requests summarised
within Appendix 8.  If Members are minded to support the funding
request consideration needs to be given as to how they would be
funded.    
Page 40

Page 41

5. IMPLICATIONS 
5.1 Policy – There are policy implications associated with the new saving
options and also previously agreed savings options which impact 2025-
26 and beyond.   
5.2 Financial – The report outlines the budget position over 2025-26 to
2029-30. 
5.3 Legal – Any legal implications have and will be considered when
developing savings options. 
5.4 HR – Any HR implications have and will be considered when developing
savings options. 
5.5 Fairer Scotland Duty – See below 
5.5.1 Equalities – Equality and Socio-Economic Impact Assessments have
been carried out where appropriate for savings options already agreed
or developed. 
5.5.2 Socio Economic Duty – Equality and Socio-Economic Impact
Assessments have been carried out where appropriate for savings
options already agreed or developed. 
5.5.3 Islands Duty - Equality and Socio-Economic Impact Assessments have
been carried out where appropriate for savings options already agreed
or developed. This includes consideration of Islands Duties. 
5.6 Climate Change – The Council is committed to addressing climate
change and reviews of how Services are delivered is ongoing within the
available budget resources. 
5.7 Risk – There is a separate report assessing financial risks and there is
also an overall assessment of risk included within the separate report on
Reserves and Balances.    
5.8  Customer Service – There may be some customer service implications
arising from the new savings options.  Future customer service
implications will be considered when developing savings options. 
5.9 The Rights of the Child (UNCRC) – None. 
Kirsty Flanagan
Executive Director /Section 95 Officer
13 February 2025 
Councillor Ross Moreland, Policy Lead for Finance and Commercial Services 
APPENDICES:
Appendix 1 – 2025-26 to 2029-30 Budget Outlook Scenarios 
Appendix 2 – Non-Pay Inflation Estimates 2025-26
Page 41

Page 42

Appendix 3 - Cost and Demand Pressures 2025-26 to 2029-30
Appendix 4 – Health and Social Care Partnership Cost Pressures
Appendix 5 – New Management/Operational Savings
Appendix 6 – New Policy Options Savings Summary and Templates 
Appendix 7 – Service Summary of Budget Position 
Appendix 8 – Funding Requests 
For further information contact Carolyn Earl, Interim Head of Financial Services
carolyn.earl@argyll-bute.gov.uk
Page 42

Page 43

BUDGET OUTLOOK 2025-26 to 2029-30 APPENDIX 1
BUDGET PACK - 27 FEBRUARY 2025
DRAFT
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
Base Budget 301,965 301,965 301,965 301,965 301,965 301,965 301,965 301,965 301,965 301,965 301,965 301,965 301,965
Base Budget Adjustments 7,311 7,311 7,311 7,311 7,311 7,311 7,311 7,311 7,311 7,311 7,311 7,311 7,311
Revised Base Budget 309,276 309,276 309,276 309,276 309,276 309,276 309,276 309,276 309,276 309,276 309,276 309,276 309,276
Pay Award - All Employees 4,298 9,050 13,944 17,305 20,733 9,050 13,944 18,985 24,177 12,217 20,532 29,263 38,431
Full year effect of 2025-26 pay award for teachers in 2026-27 base 0 496 496 496 496 496 496 496 496 496 496 496 496
SLARC Recommendations - Elected Members 206 206 206 206 206 206 206 206 206 206 206 206 206
Base Increase 2025-26 133 133 133 133 133 133 133 133 133 133 133 133 133
Pay Increments 599 897 1,194 1,492 1,789 1,194 1,789 2,384 2,979 1,194 1,789 2,384 2,979
Employer's National Insurance Increase 3,450 3,450 3,450 3,450 3,450 3,450 3,450 3,450 3,450 3,450 3,450 3,450 3,450
One-off element SPF 0 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875
Total Employee Cost Changes (Council Services) 8,686 21,107 26,298 29,957 33,682 21,404 26,893 32,529 38,316 24,571 33,481 42,807 52,570
Non-Pay Inflation - Council Services 2,978 4,749 6,989 9,359 11,871 5,723 8,610 11,654 14,868 6,670 10,237 13,990 17,946
ASN Support 202 410 624 624 624 410 624 624 624 410 624 624 624
Maintenance/Repair of School Estate 360 360 360 360 360 360 360 360 360 360 360 360 360
School Hostels 55 55 55 55 55 55 55 55 55 55 55 55 55
Election Costs 0 0 327 0 0 0 350 0 0 0 370 0 0
Education ICT Network Infrastructure 295 295 348 348 348 295 348 348 348 295 348 348 348
Planning (Local Development Plan) 0 50 0 0 0 50 0 0 0 50 0 0 0
Airport Maintenance 40 40 40 40 40 40 40 40 40 40 40 40 40
Borrowing to pay for weather incident costs 282 282 282 282 282 282 282 282 282 282 282 282 282
Housing Benefits Admin Grant 40 80 120 160 200 80 120 160 200 80 120 160 200
Civica Revenue and Benefits System 0 0 37 37 37 0 63 63 63 0 137 137 137
Compliance with BMW Ban 558 2,733 3,248 3,248 3,248 3,037 3,609 3,609 3,609 3,341 3,970 3,970 3,970
Bus Transport Contracts 1,735 2,003 2,003 2,003 2,003 2,003 2,003 2,003 2,003 2,003 2,003 2,003 2,003
Saving no longer achievable in full (TB13b) - Roads and Amenity Services Charging
100 100 100 100 100 100 100 100 100 100 100 100 100
Loans Charges relating to Weather Incident as agreed at P&R Committee 80 80 80 80 80 80 80 80 80 80 80 80 80
Migration from Skype for Business to Teams Telephony 0 19 282 282 282 63 300 300 300 108 318 318 318
Insurances 309 309 309 309 309 309 309 309 309 309 309 309 309
Valuation Joint Board 147 402 448 448 448 402 448 448 448 402 448 448 448
Allowance for Cost and Demand Pressures Future Years 0 250 500 750 1,000 500 1,000 1,500 2,000 1,000 2,000 3,000 4,000
Total Cost and Demand Pressures 4,771 8,036 9,731 9,694 9,984 8,634 10,659 10,849 11,389 9,483 12,132 12,802 13,842
Adjustment to Health and Social Care Partnership Payment 4,288 7,341 7,341 7,341 7,341 7,341 7,341 7,341 7,341 7,341 7,341 7,341 7,341
Adjustment to Live Argyll Management Fee 0 118 118 118 118 118 118 118 118 118 118 118 118
Transfer to/from Reserves 0 0 0 0 0 0 0 0 0 0 0 0 0
Total Estimated Expenditure PRIOR to measures to balance the budget 329,999 350,627 359,753 365,745 372,272 352,496 362,897 371,767 381,308 357,459 372,585 386,334 401,093
Scottish Government Grant 263,060 264,865 263,021 263,678 264,337 263,557 260,406 259,755 259,106 262,248 257,801 255,868 253,949
Transfers to/from Reserves - Strathclyde Pension Fund (7,928) 2,000 0 0 0 2,000 0 0 0 2,000 0 0 0
Council Tax 63,929 64,407 64,888 65,373 65,859 64,248 64,569 64,891 65,213 64,090 64,251 64,412 64,572
Total Funding 319,061 331,272 327,909 329,051 330,196 329,805 324,975 324,646 324,319 328,338 322,052 320,280 318,521
Budget Surplus / (Gap) PRIOR to measures to balance the budget (10,938) (19,355) (31,844) (36,694) (42,076) (22,691) (37,922) (47,121) (56,989) (29,121) (50,533) (66,054) (82,572)
Measures to Balance the Budget:
Fees and Charges 363 940 1,569 2,255 3,002 748 1,156 1,588 2,046 555 753 957 1,167
Council Tax Increase 5,643 9,119 12,793 16,675 20,775 9,111 12,768 16,624 20,689 9,103 12,744 16,575 20,606
Council Tax Increase (Growth element) 0 113 182 256 334 28 46 64 83 56 91 127 166
Management/Operational Savings agreed Feb 2023 35 35 35 35 35 35 35 35 35 35 35 35 35
Policy Savings Agreed Feb 2023 248 724 1,360 1,829 1,943 724 1,360 1,829 1,943 724 1,360 1,829 1,943
Earmarked Reserves Released to the General Fund 1,558 0 0 0 0 0 0 0 0 0 0 0 0
NEW Management/Operational Options 2025 2,102 990 1,029 1,029 1,029 990 1,029 1,029 1,029 990 1,029 1,029 1,029
NEW Policy Options 2025 991 1,527 1,627 1,627 1,627 1,527 1,627 1,627 1,627 1,527 1,627 1,627 1,627
Rounding Adjustment (2) 0 0 0 0 0 0 0 0 0 0 0 0
Total Measures to Balance the Budget 10,938 13,448 18,595 23,706 28,745 13,163 18,021 22,796 27,452 12,990 17,639 22,179 26,573
Budget Surplus / (Gap) Cumulative AFTER measures to balance the budget 0 (5,907) (13,249) (12,988) (13,331) (9,528) (19,901) (24,325) (29,537) (16,131) (32,894) (43,875) (55,999)
Budget Surplus / (Gap) In Year AFTER measures to balance the budget 0 (5,907) (7,343) 262 (344) (9,528) (10,373) (4,424) (5,212) (16,131) (16,763) (10,981) (12,124)
Mid-Range Scenario Worst Case ScenarioBest Case Scenario
Page 43

Page 44

NON-PAY INFLATION (COUNCIL) Appendix 2
Service Category Basis of Inflation Inflation
Percentage
Mid Range
2025/26
Council Wide Electricity Based on the November 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best
and worst case.
2.40% 104,206
Council Wide Gas Based on the November 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best
and worst case.
2.40% 21,579
Council Wide Heating Oils Based on the November 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best
and worst case.
2.40% 10,148
Council Wide Solid Fuel Based on the November 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best
and worst case.
2.40% 7,413
Council Wide Water Charges Based on the November 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best
and worst case.
2.40% 14,439
Council Wide Vehicle Fuel Based on the November 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best
and worst case.
2.40% 30,034
Council Wide Central Repairs - Outside Contractors Based on estimate for RPI at 2025 Q1 tracking the Bank of England forecast for CPI at November 2024, with 0.5% tolerance for best
and worst case.
3.40% 72,143
Council Wide Insurances Mid-point set at 20% for 2025/26 per uplifts in 2024/25. Reduced to 15% in subsequent years, with 0.5% tolerance for best and worst
case.
20.00% 459,473
Council Wide Contribution to Joint Boards Based on the November 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best
and worst case.
2.40% 34,987
Council Wide Non-Domestic Rates Estimate for the increase in Non-Domestic Rates, with a tolerance of 0.5% for best and worst case. 0.19% 10,000
Council Wide Contingency for unidentified/insufficient inflation estimate £250k built in to mid-range and £500k built in to worst case scenario 0
764,422
Education Pre-Primary Partner Provider Uplift Reflects the increase in the Real Living Wage from £12/hr to £12.60/hr, with a tolerance of 0.5% for best and worst case. 5.00% 197,070
Education External School Placements Based on the November 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best
and worst case.
2.40% 30,119
Commercial Services Catering Purchases Based on the November 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best
and worst case.
2.40% 58,882
Legal & Regulatory Support Leisure SLA-MAKI/Islay Pools Based on estimate for RPI at 2025 Q1 tracking the Bank of England forecast for CPI at November 2024, with 0.5% tolerance for best
and worst case.
3.40% 6,806
Legal & Regulatory Support Leisure SLA-Atlantis Based on the movement in RPIX between September 2023 and September 2024 per the SLA, with 0.5% tolerance for best and worst
case.
2.70% 18,310
Legal & Regulatory Support NPDO-Variable Element Based on estimate for RPI at 2025 Q1 tracking the Bank of England forecast for CPI at November 2024, with 0.5% tolerance for best
and worst case.
3.40% 296,746
Legal & Regulatory Support NPDO-Utilities Rebate Based on estimate for RPI at 2025 Q1 tracking the Bank of England forecast for CPI at November 2024, with 0.5% tolerance for best
and worst case.
3.40% (11,226)
Legal & Regulatory Support NPDO-Electricity Based on the November 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best
and worst case.
2.40% 16,274
Legal & Regulatory Support NPDO-Gas Based on the November 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best
and worst case.
2.40% 6,595
Legal & Regulatory Support NPDO-Heating Oil Based on the November 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best
and worst case.
2.40% 2,586
Legal & Regulatory Support NPDO-LPG Based on the November 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best
and worst case.
2.40% 2,251
Legal & Regulatory Support NPDO-Water Based on the November 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best
and worst case.
2.40% 9,672
Legal & Regulatory Support HUB-Variable Element Based on estimate for RPI at 2025 Q1 tracking the Bank of England forecast for CPI at November 2024, with 0.5% tolerance for best
and worst case.
3.40% 46,444
680,529
Customer and Support Services ICT Estimate added at 10% to reflect input from ICT on increasing costs. 10.00% 216,698
Financial Services Annual External Audit Fee Based on the November 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best
and worst case.
2.40% 8,471
Roads and Infrastructure Public Transport Reflects a 3% uplift for annual inflation set within the terms of the contracts between the Council and the service providers. 3.00% 237,431
Roads and Infrastructure School Transport Reflects a 3% uplift for annual inflation set within the terms of the contracts between the Council and the service providers. 3.00% 152,562
Roads and Infrastructure Waste PPP-Private Contractor Inflation Based on a general inflationary uplift of 3%, with a 0.5% tolerance for best and worst case. 3.00% 224,792
Roads and Infrastructure Waste PPP-Central Government Inflation Based on Landfill Tax increase between 23/24 and proposed 24/25 rate with a 0.5% tolerance for best and worst case. 21.65% 508,770
Roads and Infrastructure Helensburgh Waste Disposal Costs Based on estimate for RPI at 2025 Q1 tracking the Bank of England forecast for CPI at November 2024, with 0.5% tolerance for best
and worst case.
3.40% 55,756
Roads and Infrastructure Scottish Environmental Protection Agency Reflects the annual inflation trend in the 2023/24 and 2024/25 financial years with a 0.5% tolerance for best and worst case. 8.00% 7,211
Roads and Infrastructure Roads - Bitumen for Road Surfacing Based on the November 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best
and worst case.
2.40% 13,901
Roads and Infrastructure Electricity - Street Lighting Based on the November 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best
and worst case.
2.40% 26,591
Roads and Infrastructure Electricity - Vehicle Charging Points Based on the November 2024 Bank of England Monetary Policy Committee CPI Forecast for 2025 Q1, with a 0.5% tolerance for best
and worst case.
2.40% 5,590
Roads and Infrastructure Strathclyde Passenger Transport Requisitions Based on the 2025/26 Scottish Government Revenue Funding floor adjustment value for the Council, with a 0.5% tolerance for best
and worst case.
1.95% 12,125
Roads and Infrastructure Refuse Vehicle Ferry Fares Reflects impact on the budget of the published increase in Calmac Ferry Fares for 2025/26, with a tolerance of 0.5% for best and
worst case.
5.00% 13,380
Development & Economic
Growth
Housing Support Contracts Reflects the increase in the Real Living Wage from £12/hr to £12.60/hr, with a tolerance of 0.5% for best and worst case. 5.00% 48,947
1,532,225
2,977,176
Council Wide Total
Executive Director Douglas Hendry - Total
Executive Director Kirsty Flanagan - Total
Total Non-Pay Inflation in the Mid Range
Page 44

Page 45

COUNCIL COST AND DEMAND PRESSURES 2025-26 to 2029-30
Department Service Cost/Demand Pressure 2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
Executive Director -
Douglas Hendry
Education The demand for ASN support in Argyll and Bute has continued to grow with a significant increase in, and
early identification of children and young people presenting with complex additional support needs,
including mental health difficulties which manifests often in dysregulated behaviours.  It is anticipated
that growth continues over the next 5 years however the extent of this growth is difficult to determine. 
Scottish Government statistics show that the number of pupils identified with ASN has increased markedly
since 2010 and there continue to be year on year increases. These increases are likely due to continue as
we see the impact of the Covid 19 pandemic on children and young people who were born from 2020
onwards and as we work with partners to streamline assessment processes which help us to understand
need more thoroughly.  Scottish Government statistical datasets show that the percentage of school roll
in mainstream schools of pupils with ASN has increased by approximately 3% year on year.  Within many
authorities, this means increased numbers of children accessing specialist provision. As Argyll and Bute do
not have equitable access to Specialist provision in all areas, the cost pressure associated with offering
appropriate support within our local schools continues to increase in line with need.
202 410 624 624 624 202 410 624 624 624 202 410 624 624 624
Executive Director -
Douglas Hendry
Education There is an ongoing need for the Council to manage the maintenance/repair of Schools estate through the
education central repairs budget.  The demand on this budget has continued to increase due to the
amount of statutory maintenance work and emergency repairs which no longer allows for any planned
maintenance to be carried out.  The cost of planned maintenance has fallen on the service which cannot
be sustained.  Failure to carry out planned maintenance will impact significantly on the cost of emergency
repairs in the future.  The Council has over 75 school buildings to maintain and more reactive
maintenance work is required from Education Central Repairs due to reduced capital funding.
360 360 360 360 360 360 360 360 360 360 360 360 360 360 360
Executive Director -
Douglas Hendry
Education Following an inspection at Dunoon Hostel by the Care Inspectorate the service require additional staff on
rota to support pupils that are currently attending Dunoon Hostel. 
55 55 55 55 55 55 55 55 55 55 55 55 55 55 55
Executive Director -
Douglas Hendry
Legal and Regulatory
Services
Estimated cost (to be borne by the Council)  of carrying out local Government elections in May 2027 (and
in financial year 2027/28). Operating approx. 100 polling stations and carrying out poll and count for 11
Multi member wards – requiring 11 separate counts
0 0 327 0 0 0 0 350 0 0 0 0 370 0 0
Executive Director -
Douglas Hendry and
Kirsty Flanagan
Education and ICT The Education ICT Network infrastructure in its current design is no longer suitable to
support the future delivery of the education digital learning vision and strategy. It
requires a transformative technology upgrade, improved security, and reconfiguration
to support in-school and at home learning. There are increased security threats and risks to the corporate
and education networks by retaining the education network in its present state.  ICT does not have the
resource or capacity to undertake a strategic transformation of this scale and complexity without
significant investment in hardware and software solutions, and additional engineering resources. It is
anticipated a programme of works could take up to two years to fully deliver, and due to the rising
security threats, commencement by Summer 2024 is recommended.  Capital Costs and revenue costs for
2024-25 have been identified through repurpose of earmarkings. The cost pressure for Education from
2025-26 is £180k for specialist software licensing and an annual revenue requirement for additional
engineering resource of £115k as a future cost pressure for ICT.
295 295 348 348 348 295 295 348 348 348 295 295 348 348 348
Executive Director -
Kirsty Flanagan
Development &
Economic Growth
Local development plan will require to be done under the new Planning legislation which is a revised
process from the current one and will have a 10 year life. The new process has 2 stages where there is
likely to be a cost pressure - a gate check followed by an examination some time later.
0 50 0 0 0 0 50 0 0 0 0 50 0 0 0
Executive Director -
Kirsty Flanagan
Development &
Economic Growth
Argyll and Bute Council operate three licensed aerodromes at Oban, Coll and Colonsay. These aerodromes
are licensed by the Civil Aviation Authority (CAA) as required by law to allow scheduled passenger flight
services (for use by paying members of the public) to land and take off. The license stipulates the required
safety standards and fire cover required for each aircraft movement. Operations at the licensed
aerodromes are audited on a regular basis by the CAA and require the appropriate level of resource.  The
maintenance budget is no longer sufficient due to price increases and this cost pressure represents an
increase to right-size the budget to reflect the pattern of necessary spending over the last few years.
40 40 40 40 40 40 40 40 40 40 40 40 40 40 40
Executive Director -
Kirsty Flanagan
Financial Services At the budget setting meeting in February 2024 it was agreed to borrow to pay for the £4.348m of costs
relating to the weather incident that were not claimable through the Bellwin scheme. Whilst the Council
secured additional funding in relation to the weather related costs, this allowed the Council to freeze the
Council Tax, therefore the borrowing is still required, some in relation to the weather cost and some in
relation to other capital investments. 
282 282 282 282 282 282 282 282 282 282 282 282 282 282 282
Best Case Mid-Range Worst Case
APPENDIX 3
Page 45

Page 46

COUNCIL COST AND DEMAND PRESSURES 2025-26 to 2029-30
Department Service Cost/Demand Pressure 2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
Best Case Mid-Range Worst Case
APPENDIX 3
Executive Director -
Kirsty Flanagan
Financial Services Universal Credit “Full” Service went live in Sept 2018, managed migration for working age claimants began
in August 2023 and will be completed by December 2025. Details of the migration of Pension age Housing
Benefit claimants have not yet been released initial indications was that the overall migration to Pension
Credit will be completed in 2028/2029 although that looks unlikely now. The DWP will reduce the Housing
Benefit Administration Subsidy they pay to the Council as some claimants come off of Housing Benefit
processed by Council staff and go onto Universal Credit processed by the DWP.  The Council’s caseload has
reduced since implementation of Universal Credit but it is hard to predict just how quickly the rest of the
caseload will migrate from Housing Benefit to Universal Credit between now and 2028/2029.  These
figures represent our best estimates at this time.
40 80 120 160 200 40 80 120 160 200 40 80 120 160 200
Executive Director -
Kirsty Flanagan
Financial Services The Council has been engaged in discussions with the supplier of the Revenues and Benefits Management
System and also the Electronic Document Management System.  We expect cost increases in the future as
the supplier moves the systems to the Cloud.  The cost presure is an estimate at this time and will be
refined as we get nearer to 2027-28.
0 0 37 37 37 0 0 63 63 63 0 0 137 137 137
Executive Director -
Kirsty Flanagan
Financial Services This is due to the increase in NDR charges resulting from the Scottish Government’s rise in medium and
large business rates poundage for 2025/26. This cost is expected to be recurring but subject to potential
adjustment following legislative enactment and future revaluations.
68 68 68 68 68 68 68 68 68 68 68 68 68 68 68
Executive Director -
Kirsty Flanagan
Roads & Infrastructure
Services
Achieving compliance with ban on biodegradable municipal waste (BMW) which comes into place on 1
January 2026.  The costs are the best estimates at this stage and consultants have assisted in producing
the estimates.  The best case and worst case scenarios are based on the mid-range with a +/- 10% change
558 2,733 3,248 3,248 3,248 558 3,037 3,609 3,609 3,609 558 3,341 3,970 3,970 3,970
Executive Director -
Kirsty Flanagan
Roads & Infrastructure
Services
Bus Transport contracts have seen a siginificant increase in new contract prices due to increased costs for
fuel, insurance, maintenance, regualtory compliance and driver wages.  New contracts have seen a
combined annual increase of £975k across Argyll and Bute during 2024-25 with further contract renewals
due in 2025-26.  Work ongoing on whether savings could be made by reducing services or providing
services in a different manner.
1,735 2,003 2,003 2,003 2,003 1,735 2,003 2,003 2,003 2,003 1,735 2,003 2,003 2,003 2,003
Executive Director -
Kirsty Flanagan
Roads & Infrastructure
Services
Previously agreed saving from 2018-19 for Roads and Amenity Services Charging (TB13b) is now not fully
achievable with a shortfall of £100k.  Limited resources within Roads and Infrastructure Services has
hampered the ability to procure external work and therefore the income generation expected as part of
this saving.  Further possible methods to secure external income will be looked at as part of the RIS
Review.
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
Executive Director -
Kirsty Flanagan
Roads & Infrastructure
Services
School Transport for ASN pupils has seen a significant increase due to an increase in number of pupils
requiring school transport as well as increased costs.  This trend is likely to continue over the coming years
with the demand for ASN support expected to increase.
500 500 500 500 500 500 500 500 500 500 500 500 500 500 500
Executive Director -
Kirsty Flanagan
Roads & Infrastructure
Services
Loans charge for borrowing agreed at P&R on 15 August 2024 to cover £2.029m of the Weather Incident
costs.  £50k of the loans charges has been funded from elsewhere within the current budget.
80 80 80 80 80 80 80 80 80 80 80 80 80 80 80
Executive Director -
Kirsty Flanagan
ICT Migration from Skype for Business to Teams Telephony to ensure those staff who need to make and
receive external calls can do so. This was agreed at Policy & Resources Committee on 15 August.
0 19 282 282 282 0 63 300 300 300 0 108 318 318 318
Council Wide Council Wide Rightsize Council Insurance Budget - Insurance premiums have risen higher than previous inflationary
forecasts due to changes in law,  Increase in building values, higher contractor costs for building works,
repairs and higher component parts for cars - Inflation 22%
309 309 309 309 309 309 309 309 309 309 309 309 309 309 309
Council Wide Council Wide A letter from the Dunbartonshire and Argyll and Bute Valuation Joint Board was received on 30 January
2025 advising of the financial challenges facing the Board and the estimated 2025-26 to 2027-28 budget
gaps along with a request to increase the level of contribution that we make to the Board.  Since 2012-13
the core constituent funding to the Board has either reduced or been flast cash for the past 7 years with
the Board heavily reliant on reserves.  As the reserves will be fully depleted by 2025-26 there is a required
for the requisitions to increase.
147 402 448 448 448 147 402 448 448 448 147 402 448 448 448
Council Wide Council Wide General provision for unidentified Cost and Demand Pressures 0 250 500 750 1,000 0 500 1,000 1,500 2,000 0 1,000 2,000 3,000 4,000
TOTAL 4,771 8,036 9,731 9,694 9,984 4,771 8,634 10,659 10,849 11,389 4,771 9,483 12,132 12,802 13,842
Page 46

Page 47

SOCIAL WORK COST AND DEMAND PRESSURES - 2025-26 to 2027-28 APPENDIX 4
Service Cost/Demand Pressure 2025-26
£000
2026-27
£000
2027-28
£000
2025-26
£000
2026-27
£000
2027-28
£000
2025-26
£000
2026-27
£000
2027-28
£000
All Social Work Increase to pay base due to 2024-25 pay award (this is partly funded) 384 384 384 384 384 384 384 384 384
All Social Work Estimated Pay inflation reflecting a best case 2%, and mid-range of 3% and
a worst case of 5%.
798 1,612 2,442 1,197 2,430 3,700 1,995 4,090 6,289
All Social Work Estimated Pay increments, 2025-26 is based on calculated position
following salary template exercise, for future years the best case assumes
only 50% of the increments in 2025-26 are required and in the mid-range
and worst case, the increase is in line with the increase in 2025-26.
203 305 407 203 406 609 203 406 609
All Social Work Change to employee base for 2025-26 based on the salary template
exercise.  A significant element of the increase relates to the regrading of
staff within Children’s Houses.
282 282 282 282 282 282 282 282 282
All Social Work NIC Increase 864 864 864 864 864 864 864 864 864
All Social Work Non-pay inflation, best and worst case based on unavoidable/inescapable
inflation and worst case.
761 1,589 2,458 875 1,830 2,844 987 2,073 3,237
All Social Work Non-pay inflation impact of payroll inflation on NHS posts which are
recharged to Social Work.
75 151 230 90 182 277 105 213 325
Adult Care Older People Demand Growth: The number of older people is increasing
and older people are living longer with significant health and support
needs and significant expectations of the support they are entitled to
receive. Best case assumes that this will be offset by efficiency
improvement and increasing unmet need / demand. The mid range allows
for a 1% increase each year. Worst case is 2% per year on the older adult
services budget.
0 0 0 500 1,000 1,500 1,000 2,000 3,000
Adult Care Younger Adults Demand Growth - Physical Disability: services have been
operating within budget following delivery of savings and previous budget
increases. Best case is no additional demand pressures beyond inflation,
mid range makes some allowance in 2026/27 onwards.
0 0 0 0 121 184 90 183 279
Worst CaseMid RangeBest Case
Page 47

Page 48

SOCIAL WORK COST AND DEMAND PRESSURES - 2025-26 to 2027-28 APPENDIX 4
Service Cost/Demand Pressure 2025-26
£000
2026-27
£000
2027-28
£000
2025-26
£000
2026-27
£000
2027-28
£000
2025-26
£000
2026-27
£000
2027-28
£000
Worst CaseMid RangeBest Case
Adult Care Mental Health Demand Growth - As above, services operating within
budget overall. The best case assumes a 0% increase in spending reflecting
the limited service capacity in the area, the mid-range reflects 2% growth
in 26/27 and 27/28 and the worst case reflects 3% growth.
0 0 0 0 131 199 97 198 302
Adult Care Budget Adjustment to reflect 2024/25 levels of overspending on Older
Adult Services. This is in addition to future demand growth highlighted
above. It is not expected that the overspending can be addressed quickly
enough to enable this to be reduced in 2025/26. Best case assumes
progress in 2026/27 and would require systems improvements and
reductions in agency staffing utilisation.
2,000 1,500 1,500 2,000 2,000 2,000 2,500 2,500 2,500
Children and
Families
Looked After Children Budget Adjustment - to reflect significant increase in
demand for placements in external residential care facilities.
700 700 700 700 700 700 700 900 1,100
Adult Care Mental Health Budget Adjustment - Services are operating within budget at
present and therefore best case is to assume that this will continue in
2025/26.  The budget will be reviewed annually to reflect spending
patterns.
0 0 0 0 265 397 112 265 397
All Social Work Allowance for unknown cost and demand pressures which could arise. Per
James Gow this is to reduce to £200k pa
0 0 0 200 400 600 200 400 600
TOTAL COST AND DEMAND PRESSURES 6,067 7,387 9,267 7,295 10,995 14,540 9,519 14,758 20,168
Page 48

Page 49

MANAGEMENT/OPERATIONAL SAVINGS OPTIONS - 2025-26 APPENDIX 5
Saving
£'000
FTE H/Count Saving
£'000
FTE H/Count Saving
£'000
FTE H/Count
FS 001 25/26 Financial Services Increase in Agency Income from
Scottish Water and a reduction in
supplies and services budgets following
a review.
51 0.0 0.0 51 0.0 0.0 51 0.0 0.0
RIS 002 25/26 Commercial Waste A high level review of self-catering units
has highlighted that some do not have
commercial waste contracts.  A further
more detailed review will be carried out
but it is anticipated that there is
additional income that can be budgeted
for.  This saving will be monitored and
reported during the year.
700 0.0 0.0 700 0.0 0.0 700 0.0 0.0
CW 001 25/26 Council Wide Following a review of some supplies and
services budget, there are a number of
small efficiences that can be made
within various cost centres will limited
impact.
47 0.0 0.0 49 0.0 0.0 88 0.0 0.0
CS 002 25/26 Council Catering Service Over the last year the department has
been revising delivery models to
increaes efficiency and effectiveness of
the service and are able to reduce the
budget as a result of this.
50 0.0 0.0 50 0.0 0.0 50 0.0 0.0
CS 003 25/26 Property Services Condition Survevys - due to favourable
market conditions and the frequency to
undertake the condition surveys a one-
off saving of £50k can be made in
2025/26.
50 0.0 0.0 0 0.0 0.0 0 0.0 0.0
2027-28Ref Service Area Saving Summary 2025-26 2026-27
Page 49

Page 50

MANAGEMENT/OPERATIONAL SAVINGS OPTIONS - 2025-26 APPENDIX 5
Saving
£'000
FTE H/Count Saving
£'000
FTE H/Count Saving
£'000
FTE H/Count
2027-28Ref Service Area Saving Summary 2025-26 2026-27
LRS 001 25/26 Schools Contracts - NPDO/DBFM As part of contract management
measures there has been a contractual
review of the ongoing base budget
requirements and the base can be
reduced on a recurring basis going
forward.
108 0.0 0.0 108 0.0 0.0 108 0.0 0.0
LRS 002 25/26 Elections The annual budget for elections of
£36,751 covers the running costs of the
election office £4,848 with the balance
of £31,903 being available to fund by-
elections for the Council and
Community Councils. Given that these
are unpredictable and as such outwith
our control it is proposed that this is
treated as a centrally funded cost
pressure going forward with the budget
of £31,903 being removed from the core
budget.
32 0.0 0.0 32 0.0 0.0 32 0.0 0.0
Loans Fund Loans Fund A detailed review of the loans fund will
be undertaken, however, it is
anticipated that a one-off saving of at
least £0.500m will be achievable within
2024-25 that could be earmarked and
used to balance the 2025-26 budget. 
The saving is a result of slippage in the
capital programme and a better return
on interest rate estimates. 
500 0.0 0.0 0 0.0 0.0 0 0.0 0.0
Page 50

Page 51

MANAGEMENT/OPERATIONAL SAVINGS OPTIONS - 2025-26 APPENDIX 5
Saving
£'000
FTE H/Count Saving
£'000
FTE H/Count Saving
£'000
FTE H/Count
2027-28Ref Service Area Saving Summary 2025-26 2026-27
Funding Funding After the Council set its 2024/25 budget,
the SG allocated the Island Cost Crisis
Funding that was to be used to support
increasing service costs in islands.  As
our budget was already set, this funding
was set aside and can be carried
forward and used to help balance the
2025/26 budget on a one-off basis.
564 0.0 0.0 0 0.0 0.0 0 0.0 0.0
2,102 0.0 0.0 990 0.0 0.0 1,029 0.0 0.0
Page 51

Page 52

POLICY SAVINGS OPTIONS - 2025-26 APPENDIX 6
Saving
£'000
FTE H/Count Saving
£'000
FTE H/Count Saving
£'000
FTE H/Count
RIS 001 25/26 Roads and Infrastructure
Services
A reivew of Roads and Infrastructure is
currently being carried out.  Stage 1 was
reported to EDI in June 2024 and Stage 3-
4 are progressing.  Savings are expected
to be identified and Members will be
asked to agree each saving option when
it is identified.  The savings figure
represents a target level of savings.
300 tbc tbc 800 tbc tbc 800 tbc tbc
EDU 001 25/26 Education Services Education Service are about to
commence a review of the service, in a
similar way to Roads and Infrastructure. 
The savings figure represents a target
level of savings for Year 1 only at this
stage, as the review progresses, further
savings will be identified.
200 tbc tbc 200 tbc tbc 200 tbc tbc
CPD 001 25/26 Community Planning and
Development
Staffing efficiencies through workforce
planning and service re-shaping to
better meet needs from communities on
assets and funding.
38 1.0 1.0 63 1.0 1.0 63 1.0 1.0
DEG 001 25/26 Development Policy Re-organisation of the service and the
posts therein that carry out specific
functions creating a better structure for
the future.
44 1.0 1.0 44 1.0 1.0 44 1.0 1.0
2026-27 2027-28Ref Service Area Saving Summary 2025-26
Page 52

Page 53

POLICY SAVINGS OPTIONS - 2025-26 APPENDIX 6
Saving
£'000
FTE H/Count Saving
£'000
FTE H/Count Saving
£'000
FTE H/Count
2026-27 2027-28Ref Service Area Saving Summary 2025-26
DEG 002 25/26 Development Projects (Planning) Introduction of new charges for returned
applications, retrospective planning
applications and discharge of planning
conditions/confirmation of compliance.  
For future years assumed increase
income as a result of SG review of
statutory planning fees.
45 0.0 0.0 45 0.0 0.0 145 0.0 0.0
LRS 003 25/26 Governance Following a review of the Governance
Team it is proposed to take advantage of
a retirement within the team to re-
structure. The revised team structure
will allow for better use of available
resource and ensure that key priority
areas service levels are maintained.
33 2.0 2.0 44 2.0 2.0 44 2.0 2.0
LA 001 25/26 Live Argyll 10% cut to Live Argyll Management Fee -
savings options to deliver this level of
saving will be determined by the Live
Argyll Board.
311 tbc tbc 311 tbc tbc 311 tbc tbc
CS 001 25/26 Community Sport Removal of payments to Camanachd
Association and Scottish Rugby at
£10,000 each. 
20 0.0 0.0 20 0.0 0.0 20 0.0 0.0
991 4.0 4.0 1,527 4.0 4.0 1,627 4.0 4.0
Page 53

Page 54

2025-26 BUDGET PREPARATION – SAVING OPTION 
Executive Director with Responsibility for Roads and
Infrastructure 
Ref: RIS 001 25/26
Service Delivery Area  Roads and Infrastructure 
Saving Target 
Detail of Savings Proposal 
During 2023/24 external consultants carried out a full review of the Roads and Infrastructure
Service. Findings from stage 1 were reported to the EDI Committee, and subsequently the Council
approved that officers move onto the next stages of the Review. 
Officers will now examine the recommendations in detail and opportunities for service
improvements. Delivery of savings and detailed proposals on how the savings target will be met will
be brought forward throughout 2025/26 for members approval and a target figure of £300k has
been set. 
Saving 
2025-26 2026-27 2027-28
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
300 X X 800 X X 800 X XX 
Page 54

Page 55

2025-26 BUDGET PREPARATION – SAVING OPTION 
Executive Director with Responsibility for Education  Ref: EDU 001 25/26
Service Delivery Area  Education 
Saving Target 
Detail of Savings Proposal 
Given the many challenges currently faced by the Education Service it is essential to ensure that our
service design and delivery model is both efficient and effective. Our goal is to achieve improved
outcomes for our children and young people, while also providing best value and supporting the
Council’s ongoing financial savings requirements. 
Therefore a review of the Education Service is being commissioned which will address the Service’s
current structure, identify potential savings, as well as ideas for further innovation, collaboration,
commercialisation, externalisation and/ or participatory budgeting of elements of the Service. 
As the review is in the early stages an estimated savings figure of £200k has been identified for
2025-2026. 
Saving 
2025-26 2026-27 2027-28
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
200 X X 200 X X 200 X XX 
Page 55

Page 56

2025-26 BUDGET PREPARATION – SAVING OPTION 
Chief Executive  Ref: CPD 001 25/26
Service Delivery Area  Community Planning and Development 
Saving Target £63k 
Detail of Savings Proposal 
Over the past few years we have been doing the following in preparation of asks to reform service
and deliver differently to meet council priorities within the reducing budgets: 
Tests of change- income, collaboration
• Trialling delivering CPP to another council through SLA
• Initiating trial linking health improvement work (HSCP/NHSH) and community development
work to support community organisations.
• Creating shared budget posts for project work in CPP
• External funding around posts, i.e. levelling up. 
Digital 
• Online tools and resources for community organisations 
• Online collaborative space, Basecamp, to enable partnership document sharing and
communication 
Workforce -Trialling tests of change within team,
• Team members trained in supporting communities on assets/ asset transfer, to strengthen offer
and test this to come from the community development resource (x 4 officers) rather than one
dedicated officer. 
• Knowledge transfers from post preparing for retirement and trials of work packages into
different parts of team e.g. enhancing offer of funding support to communities by testing this in
another area of team. 
Savings proposals are from the results of the above: 
Year 1 (2025-26) – 
£38k staffing efficiencies through workforce planning and service re-shaping to better meet needs
from communities on assets and funding. 
Year 2 (2026-27)
£25k test of change – collaborative working between NHS and Council Community Development
service to support the capacity of community organisations who’s purpose supports people at most
vulnerable stages such as those experiencing addictions, into positive outcomes. ‘One authority’
approach to setting up systems to address prevention, social need, community capacity,
community-led recovery. This builds on test of change from 2024/25 joining health improvement
and community development approaches to empower communities and those most in need. 
Page 56

Page 57

Saving 
2025-26 2026-27 2027-28
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
38 1 1 63 1 1 63 1 1 
Page 57

Page 58

2025-26 BUDGET PREPARATION – SAVING OPTION 
Head of Development and Economic Growth   Ref: DEG 001 25/26
Service Delivery Area   Development Policy 
Detail of Savings Proposal 
Re-organise department:   
Re-organising the team will result in a better designed and more efficient team structure.  The
current Development Management team already possess the necessary expertise which will
continue to develop over time.  Existing Development Policy staff have the required expertise,
even if not in full time roles. Re-organising will create a better structure for succession planning
and a saving of £44k can be delivered by 2025/26. 
• Delete 1 Senior Strategies Office at LGE12 to create one LGE13 post to act as team
lead for whole of Development Policy including GIS, planning policy and the
specialists. 
• The other Senior Strategies Officer at LGE12 takes responsibility for LDP3 delivery and
planning officers.
• Delete vacant LGE11 Conservation and Design Officer post. If and when expertise is
required this will be obtained from consultants (this cost can be capitalised in project
work if supporting regeneration activity). 
Saving 
2025-26 2026-27 2027-28
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
44 1 1 44 1 1 44 1 1 
Page 58

Page 59

2025-26 BUDGET PREPARATION – SAVING OPTION 
Head of Development and Economic Growth   Ref: DEG 002 25/26
Service Delivery Area   Development Projects
Detail of Savings Proposal 
Development Management (DM):  
Increased Fee Income from Future Scottish Government Review of Statutory Planning Fees:  
Potential Saving: Increased Income £100k from April 2027  
The Scottish Government have set out the aspiration that development management activity
(i.e. the processing of planning and related applications) should be undertaken on a full cost
recovery basis. Based on the 2024/25 budget for DM additional surplus income of £115k would
be required to reach a cost recovery position for DM and Planning Enforcement activities. 
Whilst planning fee regulations have recently been updated in 2022, the Scottish Government
have subsequently acknowledged that the current statutory fee structure still does not support
full cost recovery across Scotland and have provided an undertaking for further review of
statutory fees although there is no firm commitment as yet on the timescale for this to be
realised. The Scottish Government have also indicated that with any increase in fee income
there will also be an expectation that additional funds will be invested in the improvement of
performance. Accordingly, it is proposed that any further saving to be drawn from an increase
in statutory planning fee income is deferred until 2027/28 and may require to be reviewed in
respect of any commitment imposed by the Scottish Government in relation to performance
improvement. 
Introduction of Administration Charge for Returned Applications: 
Proposed Saving: Additional Income £10k from April 2025  
The Development Management Service currently return an average of 200 planning and related
applications per annum that have been submitted but which fail to meet the minimum legal
criteria for consideration and determination. At present the cost of administering the
registration and validation check of returned applications is borne entirely by the Council. The
introduction of a £50.00 administration charge would generate additional income of approx.
£10k per annum which is currently lost when planning fees are returned with the invalid
application. There would be no additional cost to the Council in implementing this saving as this
additional income would be raised by deducting the administration charge prior to returning an
application and the balance of any statutory planning fee.  
Introduction of a Surcharge for Retrospective Planning Applications:  
Proposed Saving: Additional Income £10k April 2025  
The Town and Country Planning (Fees for Applications)(Scotland) Regulations 2022 introduced
scope for a planning authority to impose a surcharge on retrospective applications for planning
permission as a means of discouraging this type of submission through the imposition of a
financial disincentive for beaching planning control and seeking to regularise this at a later date.
Page 59

Page 60

The Fee Regulations set out that the surcharge can be a maximum of 25% of the statutory fee
payable. In order to implement the surcharge the Council would require to publish information
that identifies how the surcharge is calculated and the circumstance in which it will be imposed.
Based on a review of previous years income identified as a retrospective submission, the
imposition of a 25% surcharge would be expected to raise additional income of £10k per annum.  
Introduction of a Discretionary Charge for Discharge of Planning Conditions / Confirmation of
Compliance:  
Proposed Saving: Additional Income £25k from April 2025  
A significant portion of 1000+ statutory planning and related permissions granted annually by
the Council are subject to planning conditions which either seek to address a shortcoming in the
information provided post determination, or to impose mitigation measures that are required
to ensure that the development as built is compliant with the requirements of the Development
Plan. The handling of post determination discharge of details pursuant to condition are an
additional burden on both the admin and professional resource of the DM Service, as are
requests from an applicant to confirm that mitigation measures have been satisfactorily
completed.  
The Town and Country Planning (Fees for Applications)(Scotland) Regulations 2022 introduced
scope for a planning authority to introduce discretionary charges in relation to providing written
compliance with the terms of a planning condition. Benchmarking with other authorities would
indicate that the imposition of a discretionary charge of £100 per submission is a reasonable
cost for this service. Whilst the discharge of conditions is a regular activity within the
Development Management Service the manner in which workflow and data is currently
recorded for post determination submissions precludes detailed analysis. As a conservative
estimate however it is expected that some 250 post determination requests to discharge
conditions will be processed annually with potential income of £25k per annum. Development
of workflow for the handling and recording of post determination submissions would be
required prior to implementation but is expected to be capable of being addressed through
adaption of existing IDOX/Civica systems. 
Saving
2025-26 2026-27 2027-28
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
45 0 0 45 0 0 145 0 0 
Page 60

Page 61

2025-26 BUDGET PREPARATION – SAVING OPTION 
Head of Legal and Regulatory Support  Ref: LRS 003 25/26
Service Delivery Area  Governance
Potential Savings 
Governance Team 
Following a review of the Governance Team it is proposed to take advantage of a
retirement within the team to re-structure. This re-structure will see the deletion of one
LEG 12 post and one LGE 7 post and the creation of an LGE 9 post. The revised team
structure will allow for better use of available resource and ensure that key priority areas
service levels are maintained. 
Total gross annual Saving with this option is £43,513 
2025-26 2026-27 2027-28 
£000 FTE H/Count £000 FTE H/Count £000 FTE H/Count
Governance
restructure
33 2.0 2 44 2.0 2 44 2.0 2 
Page 61

Page 62

2025-26 BUDGET PREPARATION – SAVING OPTION 
Head of Commercial Services  Ref: LA 001 25/26
Service Delivery Area  LIVE Argyll 
Saving Target 10%  reduction in Management Fee
Detail of Savings Proposal 
LIVE Argyll (LA) are a charitable trust which deliver a number of statutory and discretionary functions
on behalf of the Council including Leisure, libraries, cultural services and learning development.   
Similar to previous years, this option, proposes a reduction to the annual management fee that is
paid to LA by the Council.  The management fee equates to 44% of LA operational costs with the
remainder being underpinned by self-generated income (56%).  There has been reduction in reliance
on Management Fee in recent years from £4.07m to £3.2m whilst retaining full service provision. 
There was a 10% reduction in Management Fee in 2024/25 and as a result LA proposed a number of
balancing actions in their Business Plan including a revised management structure, increasing income,
closure / reduction of library services and utilisation of reserves, and these actions appear to have
been implemented by LA.   
This option will require LA to produce a revised Business Care for Council to consider. It is possible
that LA will come to a view that they make compulsory redundancies and this is a matter for them. 
It should be noted that the directors of the LA have a responsibility to ensure the ongoing viability of
the company. Management Fee reductions alongside continuing unfunded cost pressures when
taken in conjunction increases the risk of noncompliance and places a risk that directors deem the
company no longer viable.   
Saving 
2025-26 2026-27 2027-28
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
311 Tbc Tbc 311 Tbc Tbc 311 Tbc Tbc 
Page 62

Page 63

2025-26 BUDGET PREPARATION – SAVING OPTION 
Head of Commercial Services  Ref: CS 001 25/26
Service Delivery Area  Community Sport – Shinty and Rugby 
Saving Target £20,000
Detail of Savings Proposal 
For over 10 years the Council have supported the development of community sport through the
direct financial payment to Camanachd Association (CA) and Scottish Rugby (SR).   
In this year 2024/25 both SR and CA received a payment of £10,000 each.  This figure has been
consistent at this level for approximately 10 years.   
The funding is a joint partnership between CA / SR, Sport Scotland, Live Argyll and Argyll & Bute
Council and it employs a dedicated Regional Development Officer in the Argyll & Bute Region to
lead the plan for the promotion and development of each sport in Argyll & Bute. 
The 2x regional development officers (1 for each sport) work with Live Argyll, support schools
(Active Schools) as well as local clubs to increase participation, improve accessibility to sport,
improve the quality of development and support community development.   
There is no direct Council staff employed and agreement to fund the posts are on a 3-year basis but
with 1 year funding support commitment.  There is a high likelihood that the Regional Development
Officers posts would be removed if any of the 3 funding partners pulled funding.   
Both CA and SR have been informed that this is a potential strategic savings option that is being
considered.   
Camanachd Association
The Camanachd Association have stated that Council funding supports Camanachd Association to: 
• Enhance shinty’s reach into communities through teacher training and
collaboration with schools and active schools to maximise their contribution to
shinty.
• Empower young people to develop shinty participation and awareness in their
community.
• Foster corporate partnerships to further support the growth and development
of shinty in Argyll and Bute.
• Sustain and increase the number of boys and girls playing shinty that is inclusive
for all.
• Develop well organised run clubs and associations.
• Recruit and train volunteers. 
Scottish Rugby 
SR have confirmed in January 2025 that the Council funding is essential to continue the Rugby
Development Officer Post.  The Argyll Post has been vacant for a few weeks but is currently out to
recruitment with the outcome of this Savings Template now being a factor to Scottish Rugby to
consider before appointment.  The Development Officer works to:- 
Page 63

Page 64

• Extend rugby’s reach through collaboration with schools, teachers, and active schools
programs to increase participation.
• Empower young people to grow rugby’s presence and visibility within their communities,
through developing local leaders and national and regional youth panels. 
• Build corporate and community partnerships that strengthen rugby’s foundation and
future.
• Sustain and grow the number of boys and girls participating in inclusive rugby activities.
• Support the development of well-organized and high-performing clubs.
• Recruit, train, and empower volunteers essential to the sport's development. 
It is likely the SR DO would cease with near immediate effect if this saving is made subject to
appropriate notice or freeze on the current recruitment.  
Saving 
2025-26 2026-27 2027-28
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
20 0 0 20 0 0 20 0 0 
Page 64

Page 65

APPENDIX 7
SERVICE SUMMARY OF BUDGET POSITION 2025-26
Department Service 2024-25
Budget
Other Base
Budget
Adjustments
Settlement
Commitments
Updated Base
Budget
Employee
Budget
Changes
Non-Pay
Inflation -
Inescapable
Cost and
Demand
Pressures
Live Argyll
Management
Fee
Adjustment
Measures to
Balance the
Budget
Social Work
Pressures
Absorbed by
HSCP
DEFRA
Finance
Order
Updates
Post Meeting
Adjustments Preprofiling 2024-25 Draft
Budget
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Council Departments:
Chief Executive's Unit Chief Executive 900 5 0 905 51 0 0 0 (38) 0 0 0 0 0 918
Executive Director (Douglas Hendry) Executive Director (Douglas Hendry) 29 2 0 31 25 0 0 0 0 0 0 0 0 0 56
Executive Director (Douglas Hendry) Head of Commercial Services 10,265 171 0 10,436 595 155 0 0 (466) 0 0 0 0 0 10,720
Executive Director (Douglas Hendry) Head of Education 115,495 1,990 2,700 120,185 4,589 337 797 0 (201) 0 0 0 0 0 125,707
Executive Director (Douglas Hendry) Head of Legal and Regulatory
Support
21,228 37 0 21,265 247 377 0 0 (342) 0 0 0 0 0 21,547
Executive Director (Kirsty Flanagan) Executive Director (Kirsty Flanagan) (366) 2 0 (364) 20 0 0 0 0 0 0 0 0 0 (344)
Executive Director (Kirsty Flanagan) Head of Customer Support Services 8,794 59 0 8,853 573 124 115 0 (27) 0 0 0 0 0 9,638
Executive Director (Kirsty Flanagan) Head of Development and Economic
Growth
7,897 110 (23) 7,984 554 64 40 0 (128) 0 0 0 0 0 8,514
Executive Director (Kirsty Flanagan) Head of Financial Services 6,756 (31) 123 6,848 410 51 40 0 (132) 0 0 0 0 0 7,217
Executive Director (Kirsty Flanagan) Head of Roads and Infrastructure
Services
33,315 348 190 33,853 1,301 1,327 2,893 0 (1,340) 0 (1,348) 0 0 0 36,686
0 0 0 0 0 0 0Non Departmental: 0 0 0 0 0 0 0
Joint Boards Joint Boards 1,458 (114) 0 1,344 0 35 147 0 0 0 0 0 0 0 1,526
Other Operating Income & Expenditure Elected Members 1,199 33 0 1,232 272 0 0 0 0 0 0 0 0 0 1,504
Other Operating Income & Expenditure Sundry Services 577 1,399 0 1,976 37 39 0 0 0 0 0 0 0 0 2,052
Other Operating Income & Expenditure Unfunded Pensions 1,554 0 0 1,554 0 0 0 0 0 0 0 0 0 0 1,554
0 0 0 0 0 0 0Non Controllable Costs: 0 0 0 0 0 0 0
Insurances 1,989 0 0 1,989 0 459 309 0 0 0 0 0 0 0 2,757
Non Domestic Rates 5,091 300 0 5,391 0 10 68 0 0 0 0 0 0 0 5,469
Apprenticeship Levy (Council) 612 7 2 621 12 0 0 0 0 0 0 0 0 0 633
Capital Charges (loans charges) 7,967 0 0 7,967 0 0 362 0 0 0 0 0 0 0 8,329
0 0 0COUNCIL TOTAL 224,760 4,318 2,992 232,070 8,686 2,978 4,771 0 (2,674) 0 0 0 0 244,483
Health and Social Care Partnership:
Social Work Chief Officer (3,245) 0 2,278 (967) 36 0 0 0 0 (1,093) 0 0 0 0 (2,024)
Social Work Acute and Complex Care 21,474 0 0 21,474 350 0 0 0 0 0 0 0 0 0 21,824
Social Work Children & Families 15,200 0 0 15,200 1,060 0 0 0 0 0 0 0 0 0 16,260
Social Work Health and Community Care 43,289 0 257 43,546 1,370 0 0 0 0 0 0 0 0 0 44,916
Social Work Strategic Planning and Performance 486 0 0 486 30 0 0 0 0 0 0 0 0 0 516
0 0SOCIAL WORK TOTAL 77,204 0 2,535 79,739 2,846 0 0 0 0 (1,093) 0 0 0 0 81,492
Rounding 1
TOTAL 301,964 4,318 5,527 311,809 11,532 2,978 4,771 0 (2,674) (1,093) 0 0 0 0 325,976
Funding:
Scottish Government Funding 259,134
Scottish Government Funding for ENICs 2,578
Council Tax Income 69,570
Saving Options Funded by Reserves 1,064
Transfer from Reserves to General Fund 1,558
Balance to Reserves - Council (6,875 one off pension saving less 2,000 released for 25-26) (4,875)
Social Work - one off pension saving to be held in Council reserves (3,053)
OVERALL FUNDING SURPLUS / (GAP) 0
Page 65

Page 66

Appendix 8
FUNDING REQUESTS 
1. Introduction 
1.1 Funding requests have been received to be considered as part of the Budget
as outlined below.   
2. MacTaggart Leisure Centre, Islay 
2.1 During the budget process over the past two years MacTaggart Leisure Centre
in Islay has benefited from a £30,000 uplift in their Service Level Agreement
Payment.  The Leisure Centre have said that the extra £30,000 above the
Service Level Agreement has kept them afloat over the last 2 years. 
2.2 The ever rising costs to run the Centre, electricity, utility bills, chemicals,
insurance and staffing costs are becoming even more of a challenge and
difficult to find the extra monies to cover these rising costs.  The Centre also
had unexpected plant faults, and it was essential they were repaired.   
2.3 The waste heat from the Distillery has also contributed to their financial
challenges, with the Distillery stopping production during August and October
(and for a month at Christmas).  When the Distillery started back up on 22
October, the Centre was not able to utilise the waste heat again due to the
return flow pipe being burst underground to the Distillery from the Centre.  The
implications of this are that the Centre are now relying on oil usage which costs
significantly more.  The engineer working on this fix has advised that it is not a
quick fix and as at January the Centre were still waiting on timescales for the
repairs.   
2.4 The Centre have asked for another year of the extra £30,000 due to the
outcomes of this financial year being more financially challenging for the Centre
than predicted.   
2.5 The request is for funding of £30,000.  Members are asked to consider this
request and how it would be funded. 
3 Argyll and Isles Tourism Cooperative (AITC) 
3.1 Argyll and Isles Tourism Cooperative has received vital financial support from
Argyll and Bute Council over a number of years. Combined with membership
fees and other grant support, they have invested in campaign and search
engine optimisation (SEO) content development.   Primary websites Wild About
Argyll and Love Oban, significantly uplift the reach of new and existing visitors
and support businesses across the sector. 
Page 66

Page 67

3.2 This investment has led to the best visitor reach they have achieved in their 13-
year tenure, meaning the destination is reaching and inspiring more visitors
than ever before.
• Over 500,000 unique visitors to our websites, delivering over 1m user
sessions.
• Almost 50,000 social media followers.
• A newsletter database of 500+. 
3.3 Recent visitor data for 2024 suggests that visitor numbers to Scotland are down
from 2023 due to wider factors such as ongoing ferry issues, poor weather, the
cost of living subduing the domestic visitor market, and rising business costs. 
AITC comment that they must continue to market the destination with
VisitScotland to ensure that Argyll and Bute continue to enjoy the significant
economic impact our visitors bring. 
3.4 AITC will continue to support businesses with understanding and implementing
(if applicable) the Visitor Levy and will continue to provide learning opportunities
around the following themes:
• Marketing practices
• Social media content development
• PR and media relations. 
3.5 The budget requested to support the overall delivery of the marketing activities
for 2025-26 will be delivered by the AITC team and specialist partners as
required. Funds will be drawn from membership fees paid to AITC and
requested £75,000 grant from Argyll and Bute Council. Grants from
VisitScotland and other parties may be utilised if available. Where possible, they
will use existing assets and repurpose relevant content. They will seek
additional assets and campaign opportunities via key regional partners. The 
£75,000 Argyll and Bute Council grant is anticipated to be apportioned as
follows. 
3.6 The £75,000 Argyll and Bute Grant is anticipated to be apportioned as follows: 
ACTIVITY BUDGET OUTCOMES
PR, media – destination
positioning / print
5,000 • Reach new audiences.
Travel Trade Activity 5,000 • Reach new audiences.
Bloggers, Influencers 10,000 • Reach new audiences.
• Extend the season.
Paid social promotion 2,500 • Boost marketing reach
across all campaigns.
New format, license-free
photography and video
5,000 • Assets that can be shared
with Visit Scotland, A&BC
& and AITC Members.
SEO Copywriting and new
content development
10,000 • Insight-based new content
across all Wild About
Argyll & Love Oban areas.
Campaign delivery 32,500 
Page 67

Page 68

Business support initiatives 5,000 
TOTAL £75,000 
3.7 The request is for funding of £75,000 and further information related to this
request has been emailed to all Members on 13 February 2025.  Members are
asked to consider this request and how it would be funded. 
4 Culture, Heritage and Arts Assembly, Argyll and Isles (CHARTS) 
4.1 The Culture, Heritage and Arts Assembly, Argyll and Isles (CHARTS), is
requesting £95,000 of financial support from Argyll and Bute Council for the
year 2025-26.  This will be used to enable development their delivery plan
2025-26, building resilience and profile across the region's culture, arts and
heritage sector.  It aims to drive the sector forward and build on the successes
the organisation has achieved to date, including through the £75,000 support
received from the Council in 2024-25. 
4.2 Since 2020, CHARTS has generated an income in excess of £1.2m for the
culture sector, building on a total of £325,000 support from Argyll and Bute
Council across the same period. This demonstrates significant return on
Council investment that has enabled CHARTS to continue its successful
project delivery and grow reputation for the region. 
4.3 The Board recognises that this request to the Council is higher than those
made in previous years and there is a distinct reason for this. It is now
imperative that CHARTS upgrades its website capabilities as key function to
sustaining the sector, as its original website operations system funded by the
Council in Place Partnership with Creative Scotland (2019), has come to an
end, leaving the organisation at risk with a digital structure which is neither
suitable nor secure for sector and stakeholder communications or to assist
the organisation in generating increased income to help sustain the sector.
As a charitable organisation the Board is conscious of the need to diversify
income streams and this is a priority as the organisation develops in order to
become more sustainable, including with plans to develop ecommerce from
2025, it is vital to upgrade the website, and its visitor offer. 
4.4 CHARTS strategy meets the ambitions of the Argyll and Bute Economic
Strategy (2024 – 2034) with a focus on partnership and collaboration and
delivers across the four strategic key pillars: People, Place, Planet and
Prosperity. The organisation designs innovative projects and programmes to
secure investment for training and work across the sector and is increasing
its work with young people to assist to sustain the regions rich cultural assets.
As a Placemaking organisation, CHARTS assists to build the profile of the
region as an attractive place to live and work. The organisation continually
addresses the decline in the economically active population, improving
workforce skills for members and stakeholders. CHARTS attracts highly
experienced staff to project management roles, and promote equal access to
education opportunity, project commissions and awards, supporting
economic opportunities that help to sustain cultural businesses and creative
ambition. 
Page 68

Page 69

4.5 CHARTS’ purpose is to work towards a sustainable future for the important
culture, heritage and arts business sectors which has been identified as a key
economic driver with real growth potential and which has wide impact on skills
development, supporting young people and other sectors such as tourism
and food and drink, which they have been able to demonstrate across recent
years through collaborations and commissioning. Their work not only aligns
with a key aim of the Council’s Economic Strategy 2024-2034, but also other
key national and local government strategies including the Visitor Economic
Regional Growth Strategy, and the Argyll and Isles Strategic Tourism
Partnership Visitor Economy Recovery and Growth Strategy, to support the
future sustainability of the Argyll and Bute creative industries. 
4.6 The request is for funding of £95,000 and further information related to this
request has been emailed to all Members on 13 February 2025.  Members
are asked to consider this request and how it would be funded. 
5 Loch Lomond and the Trossachs National Park – West Highland Way 
5.1 Following many months of discussions and agreement amongst the West
Highland Way Management Group partners, a new charitable body – the
West Highland Way Trust – was registered with OSCR in October 2024.  The
charity is currently being set up and once it is fully operational, it will provide
additional fundraising and income generation opportunities to support the
Access Authorities to maintain the route. 
5.2 As a short-term action to ensure that the Trust has a solid base to build from,
there was agreement that contributions from each Access Authority would
provide value for money and, to that end, so far Highland Council and
National Park Authority have committed funding of £10,000 each for financial
year 2024-25 and 2025-26.  As a partnership they are seeking similar from
Argyll and Bute, Stirling and East Dunbartonshire Councils.  The ask, at this
time, to Argyll and Bute Council is a one-off £10,000 contribution. NatureScot
has also responded positively in terms of some financial support for this new
way to help sustain the management and maintenance of long-distance
routes. 
5.3 The Trust presents an opportunity to significantly support the work of the
public bodies, including financially, to ensure the West Highland Way is kept
maintained to the appropriate standard so the communities and businesses
along the route can continue to benefit from this key asset, along with
ensuring access to and protection of the surrounding nature and environment.
For the avoidance of doubt, the intention is that the working group of Access
Authority staff continues to operate to support collaborative management,
maintenance and investment for the whole route. In time, this group should be
supported financially by the Trust with the increased revenue generation. 
5.4 The whole ethos of the Trust is to pursue fundraising opportunities that would
otherwise be unavailable to Access Authorities, so it is hoped that the Council
would see this as a spend to save scenario in the longer term.
Page 69

Page 70

5.5 The request is for funding of £10,000 and further information related to this
request has been emailed to all Members on 13 February 2025.  Members are
asked to consider this request and how it would be funded.   
Page 70

Page 71

ARGYLL AND BUTE COUNCIL COUNCIL
FINANCIAL SERVICES 27 FEBRUARY 2025
REVENUE BUDGET 2025-26
FEES AND CHARGES  
1 EXECUTIVE SUMMARY 
1.1 This report provides Members with information in relation to fees and charges for
2025-26. 
1.2 The Council raises fees and charges for a number of services it delivers, and a
review of the level of fees and charges is carried out each year. 
1.3 The general increase to fees and charges is proposed at 6% for 2025-26.  A 6%
increase was applied in 2024-25 following a 6% increase in 2023-24 and a 3%
increase each year between 2017-18 and 2022-23. 
1.4  There are some exceptions to the general inflationary increase which are outlined
within the report at paragraph 3.2.2.  There are also charges where no inflationary
increase has been applied, noted in paragraph 3.5 and charges where the rate is
set by others, noted in paragraph 3.6.  The total of the general inflationary
increase plus the exceptions would equate to additional income of £0.363m.   
1.5 Harbour Fees have been increased by 3%. This 3% increase is ring fenced to
fund asset improvement and sustainability within the piers and harbours. This is
estimated to generate additional income of £0.279m. No general inflationary
increase has been proposed for piers and harbours dues to ensure that the
service is cost neutral. 
1.6 New fees and charges which are being introduced for 2025-26 are itemised in
section 4.
 Ferry Services
o Jura Ferry Concession Fare, car and driver
o Cuan Ferry Concession Fare, car and driver
 Short-term let licensing
o New fees introduced on the back of a revision of the STL Policy.
 Environmental Health Section 50 Licence Certificate
o New fee to recover the costs from business as a result of savings
option DEG 002 25/26
 New discretionary planning fees that are part of proposed savings. 
1.7 All fees and charges are included within the attached schedule of charges. 
Page 71 Agenda Item 2b

Page 72

ARGYLL AND BUTE COUNCIL COUNCIL
FINANCIAL SERVICES 27 FEBRUARY 2025
REVENUE BUDGET 2025-26
FEES AND CHARGES  
2. INTRODUCTION 
2.1 This report provides Members with information in relation to fees and charges for
2025-26. 
3. DETAIL 
3.1 The Council raises fees and charges for a number of services it delivers, and a
review of the level of fees and charges is carried out each year.  Appendix 1 to
this report contains the full list of fees and charges for each service and the
following paragraphs summarise the main changes.   
3.2 General Inflationary Increase 
3.2.1 The general increase to fees and charges is proposed at 6% for 2025-26.  A 6%
increase was applied in 2024-25 following a 6% increase in 2023-24 and a 3%
increase each year between 2017-18 and 2022-23. 
3.2.2 There are a few exceptions to the standard inflationary increase, and these are
noted in the table below: 
Description Increase Reason for Increase
Local Authority
Residential Care
Provision (Community
Care) 
9%  Charge has been right-sized to reflect
budgeted costs.
Non - Residential
Services – excluding
Sleepover Service
9% 24/25 Nursing Rate less a Nursing
premium
Local Authority
Nursing Care
Provision (Community
Care)
9% 24/25 Residential rate
Children & Families -
Local Authority
Residential Care
Provision
43% Charge levied to other HSCPs/Councils
buying places from Argyll and Bute.
Hostel Charges -
Catering: Tea, Coffee
and Biscuits
10% Realigned with similar charges. 
Commercial Refuse  13% Additional 7.22% inflation on mixed
waste refuse collection charges due to
Page 72

Page 73

landfill tax increase
Waste Management -
Tipping Charge per
Service, including
Landfill Tax
17% Waste disposal price per tonne uplifted
to £166.50 to reflect landfill tax
increase.
Householder Scrap
Car Removal
63% Uplift reflects Council contractor cost
increase for removal/uplift and disposal
Waste Disposal 17% - 22% Various impacts of increase to landfill
tax
Jura Vehicle Fares -
all vehicles up to and
including 6m - single
journey (incl driver)
10% Service request for an additional £0.40
increase on what would have been the
6% uplift as the cost of 2 single
journeys would come in less than the
excursion return ticket
Crematorium Charges 10%-12% £39 charge for dispersal of ashes now
absorbed in with the overall charge
(individual elements of the 24-25
charges uplifted 6%)
Electric Vehicle
Charge per KwH
56% Charge has been increased to reflect
increasing asset management costs.
Additional income will be ring fenced
within the service area to cover
ongoing costs. This increase brings
charges in line with the majority of
other Local Authorities and closer to
the rate charged by private providers.
Given the increasing costs likely to
come forward to manage this asset
group, a delegation to Officers to have
authority to vary the fees in-year if
necessary has been granted.
Photocopying/Printing 3% - 27% Various photocopy types adjusted to
take into account VAT error in 2024-25 
3.2.3 The total impact of the general inflationary increases and those in the table
above equates to an increase in income of £0.363m. 
3.3 Piers and Harbours 
3.3.1 Harbour Fees have been increased by 3%. This 3% increase is ring fenced to
fund asset improvement and sustainability within the piers and harbours. This is
estimated to generate additional income of £0.272m. No general inflationary
increase has been proposed for piers and harbours dues to ensure that the
service remains cost neutral. 
3.4 Social Work Charges 
3.4.1 The 2025-26 Social Work Fees and Charges schedule was presented to and
endorsed by the IJB at its meeting on 29th January 2025. All Social Work fees
and charges are included within the attached schedule of charges. This includes
the removal of all Hostel Charges, which have now been allocated under
Page 73

Page 74

Education. 
There are no other changes proposed to the Social Work charging policies for
2025-26. 
3.5 No Inflationary Increase 
3.5.1 There are a number of fees where no inflationary increase has been applied.
These are: 
 All licences included under Legal and Regulatory / Commercial Services and
subject to the last Triennial Review agreed in May 2024 will have no increase
in fees until May 2027.
 Helensburgh Civic Centre Events - the hire rate needs to be benchmarked
and charged in line with other hall hires in the Helensburgh and Lomond area
to remain competitive.  There is a risk that any rise in charge beyond those of
similar facilities locally would result in community groups and other hirers
opting to use alternative venues, which would result in a loss of income to the
Council rather than an increase. 
 Hermitage Park Pavilion Community Room – aligned to Civic Centre Events 
 Registrars Fees and related charges – these are set by Registrar General
and there is no increase for 2025-26.
 School meals income (see paragraph 3.5.2). 
 Private water supplies – these are statutory charges and capped at fixed
amounts.
 Homeless Temporary Accommodation – not subject to inflation, only the
service charge is inflated.
 Parking – as per recommendation in the Council’s review of TRO
arrangements.  Argyll and Bute Council are currently carrying out a review of
Roads and Infrastructure Services and as such no inflation has been applied
at this stage.  Proposals will be brought forward as part of the Roads and
Infrastructure review improvement recommendations.   
3.5.2  Members are asked to consider a recommendation from officers that the
charges for school meals are not increased in 2025/26 (similar to the position in
2024/25 and 2023/24).  There are non-financial factors which officers have taken
into account in their assessment which they consider outweigh the financial
benefits to the Council from an increase in the school meals charges which are: 
 The financial impact on families of additional school lunch costs would
compound the financial difficulties which many families are already having to
cope with in the current cost of living crisis. Families may opt to continue to
buy the more expensive meals and look at other areas of their expenditure to
cut back on to balance their household budgets or they might seek
alternative lower cost, less healthy and less nutritional meal options
elsewhere. Both options are highly likely to be detrimental to the overall
health and wellbeing of pupils and their families. 
 The Council has a statutory duty under the Schools (Health Promotion and
Nutrition) (Scotland) Act 2007 to promote nutrition with school meals
provision being a key element of the Council’s efforts to ensure that all
children have at least one nutritious meal per day. Local research on demand
Page 74

Page 75

modelling shows that an increase in school meal charges will most likely
reduce demand and therefore uptake of school meals. The result would be
fewer children having a nutritious school meal which would be
counterproductive to the Council satisfying its statutory obligation. 
3.6  Fees set by Others 
3.6.1  There are also a number of services where the charges are advised by others
and therefore, at present, have not been inflated or an estimated inflation rate
has been applied: 
 Registrars Fees - these are set by the Registrar General and the last fees
were set in May 2022. 
 Removal of abandoned car – this charge is set by legislation.
 Petrol Storage Certificate
 Explosives/Fireworks License and Registration
 Private Water Supplies
 Landfill Tax
 Roads Inspection charges, set by Roads Authority and Utility Committee
(Scotland). 
 Penalty Charges notices set by the Scottish Government. 
 Private Landlord Registration Fees set by the Scottish Government.
 Inter-Authority Substitute Family Care Placements
 Blue Badges. 
3.6.2 Building Warrant Fees are set by Scottish Government on a triennial basis and
have been increased for 2025-26.  This is anticipated to produce additional
income for Local Authorities which will offset the lost GAE for the new Building
Control Hub in the Fife area and also allow Local Authorities to employ
additional staff in order to strengthen and grow their building standards
verification service. 
4. NEW FEES AND CHARGES 
4.1  The 2025-26 budget proposals include new fees and charges for the following: 
Description Charge Reason for New Fee
Cuan Vehicle Fares -
Car including
concession driver
return - must present
SPT ferry travel card
£12.40 New concession fare introduced for
2025-26 to combine driver and car
tickets in similar manner to other fares in
2024-25.
Cuan Vehicle Fares -
Car with blue badge
holder (25% discount)
including concession
driver return - must
present SPT ferry
travel card 
£9.70 New concession fare introduced for
2025-26 to combine driver and car
tickets in similar manner to other fares in
2024-25. Blue badge holder discount
reduced from 50% to 25% to align to
common practice on other ferries (see
Cal Mac)
Page 75

Page 76

Cuan Vehicle Fares -
Car with blue badge
holder (25% discount)
including driver return 
£11.10 New concession fare introduced for
2025-26 to combine driver and car
tickets in similar manner to other fares in
2024-25. Blue badge holder discount
reduced from 50% to 25% to align to
common practice on other ferries (see
Cal Mac) 
Jura Vehicle Fares -
Private Vehicles - Car
including concession
driver return - must
present SPT ferry
travel card
£21.10 New concession fare introduced for
2025-26 to combine driver and car
tickets in similar manner to other fares in
2024-25.
Jura Vehicle Fares -
Private Vehicles - Car
with blue badge
holder (25% discount)
including concession
driver return - must
present SPT ferry
travel card 
£16.20 New concession fare introduced for
2025-26 to combine driver and car
tickets in similar manner to other fares in
2024-25. Blue badge holder discount
reduced from 50% to 25% to align to
common practice on other ferries (see
Cal Mac) 
Jura Vehicle Fares -
Private Vehicles - Car
with blue badge
holder (25% discount)
including driver return 
£19.70 New concession fare introduced for
2025-26 to combine driver and car
tickets in similar manner to other fares in
2024-25. Blue badge holder discount
reduced from 50% to 25% to align to
common practice on other ferries (see
Cal Mac)
Environmental Health
Section 50 Licence
Certificate
£176.00 This is a new fee to recover the costs
from business, in considering and
determining applications for Section 50
Environmental Health certificates. A
similar fee is charged by development
control and building standards for S50
certificates and this provides a
consistent charging structure across
these regulatory services. 
Surcharge for
retrospective planning
permission 
25% of
planning
fee
To help cover the costs for work on
retrospective planning permission
requests
*Please note that this new charge is
part of savings option DEG 002 25/26
which is still to be agreed.
Admin Charge for
return of invalid
application
£50.00 To help cover the costs for work to
attempt to validate the application
*Please note that this new charge is
part of savings option DEG 002 25/26
which is still to be agreed.
Page 76

Page 77

Discharge of planning
conditions
£110.00 To help cover the costs involved with
discharge of conditions
*Please note that this new charge is
part of savings option DEG 002 25/26
which is still to be agreed. 
4.2  Short-term let Licensing – the following fees although ‘new’, are funding that
pays for the administering of the short-term lets and therefore do not represent
more income that is available for the Council to spend. 
Short-term let
Licensing: 
Confirmation of a
provisional STL
licence application 
£212.00  Revision of STL Policy and introduction
of new fees
Short-term let
Licensing: Application
to extend provisional
short-term let licence 
£91.70 Revision of STL Policy and introduction
of new fees
Short-term let
Licensing: Transfer of
a licence 
£91.70 Revision of STL Policy and introduction
of new fees
Short-term let
licensing: Application
for provisional licence
- home letting/home
sharing
accommodating to 4
guests 
£42.30 Revision of STL Policy and introduction
of new fees
Short-term let
licensing: Application
for provisional licence
- home letting/home
sharing
accommodating 5-8
guests 
£143.15 Revision of STL Policy and introduction
of new fees
Short-term let
licensing Application
for provisional licence
- home letting/home
sharing
accommodating 9 -12
guests 
£379.90 Revision of STL Policy and introduction
of new fees
Short-term let
licensing: Application
£541.90 Revision of STL Policy and introduction
of new fees
Page 77

Page 78

for provisional licence
- home letting/home
sharing
accommodating 13-20
guests 
Short-term let
licensing: Application
for provisional licence-
home letting/home
sharing
accommodating 21
and over guests 
£757.50 Revision of STL Policy and introduction
of new fees
Short-term let
licensing: Application
for provisional licence-
secondary letting
accommodating up to
4 guests 
£164.35 Revision of STL Policy and introduction
of new fees
Short-term let
licensing: Application
for provisional licence
- secondary letting
accommodating 5-8
guests 
£326.30 Revision of STL Policy and introduction
of new fees
Short-term let
licensing: Application
for provisional licence
- secondary letting
accommodating 9 -12
guests 
£595.50  Revision of STL Policy and introduction
of new fees
Short-term let
licensing: Application
for provisional licence
- secondary letting
accommodating 13-20
guests 
£864.70 Revision of STL Policy and introduction
of new fees
Short-term let
licensing: Application
for provisional licence
- secondary letting
accommodating 21
and over guests 
£1,133.85 Revision of STL Policy and introduction
of new fees 
Page 78

Page 79

5.  REMOVED FEES AND CHARGES 
5.1 The 2025-26 budget proposals reflect fees and charges which have been
removed as they are no longer required: 
Description Charge
(24-25)
Reason for Fee Removal
Cuan Vehicle Fares -
Private Vehicles -
cars, trailers or
caravans - Return -
Up to and Including
5m
£10.30 No longer required as new fee
introduced in 2024-25 to include driver.
Cuan Vehicle Fares -
Private Vehicles -
cars, trailers or
caravans - Up to and
Including 5m - 5
Return Journeys
£33.90 No longer required as new fee
introduced in 2024-25 to include driver.
Cuan Vehicle Fares -
Private Vehicles -
Motorcycle – Return
£4.20 No longer required as new fee
introduced in 2024-25 to include rider.
Cuan Vehicle Fares -
Private Vehicles -
Motorcycle - 5 Return
Journeys
£13.70 No longer required as new fee
introduced in 2024-25 to include rider.
Cuan Vehicle Fares -
Commercial
Vehicles/Coaches -
5.01m to 8.0m –
Return
£21.80 No longer required as new fee
introduced in 2024-25 to include driver.
Cuan Vehicle Fares -
Commercial
Vehicles/Coaches -
8.01m to 12.0m –
Return
£32.80 No longer required as new fee
introduced in 2024-25 to include driver.
Cuan Vehicle Fares -
Commercial
Vehicles/Coaches -
12.01m to 18.0m –
Return
£66.80 No longer required as new fee
introduced in 2024-25 to include driver.
Cuan Vehicle Fares -
Commercial
Vehicles/Coaches -
5.01m to 8.0m - 5
Return Journeys
£106.10 No longer required as new fee
introduced in 2024-25 to include driver.
Cuan Vehicle Fares -
Commercial
Vehicles/Coaches -
8.01m to 12.0m - 5
£160.50 No longer required as new fee
introduced in 2024-25 to include driver.
Page 79

Page 80

Return Journeys
Cuan Vehicle Fares -
Commercial
Vehicles/Coaches -
12.01m to 18.0m - 5
Return Journeys
£326.30 No longer required as new fee
introduced in 2024-25 to include driver.
Jura Vehicle Fares -
Private Vehicles -
Excursion Return
£18.40 No longer required as new fee
introduced in 2024-25 to include driver.
Jura Vehicle Fares -
Private Vehicles -
Motor Cars 50%
Disability Discount -
Return (Based on
50% Excursion
Return)
£9.20 No longer required as new fee
introduced in 2024-25 to include driver.
Jura Vehicle Fares -
Private Vehicles -
Motorcycle – Single
£4.60 No longer required as new fee
introduced in 2024-25 to include rider.
Jura Vehicle Fares -
Private Vehicles -
Motorcycle - 10
Journeys
£29.70 No longer required as new fee
introduced in 2024-25 to include rider.
Short-term let
licensing- temporary
licence fee
50% of
relevant
total
licence fee
STL policy proposes that the Council will
not consider applications for temporary
licences or temporary exemptions.
Position to be kept under review.
Short-term let
licensing- temporary
exemption application
50% of
relevant
total
licence fee
STL policy proposes that the Council will
not consider applications for temporary
licences or temporary exemptions.
Position to be kept under review.
Inveraray Primary
Charges - Catering:
Lunch (2 course with
coffee)
£12.10 Now covered by special catering menus,
Hostel Charges -
Catering: Lunch (2
course with coffee)
£11.75 Now covered by special catering menus. 
6. CONCLUSION 
6.1 The general inflationary increase would equate to additional income of £0.363m
in 2025-26.  All other fee increases agreed as part of previous budgets have
been accounted for within the base budget or as part of the previously agreed
savings amount. 
6.2  The 3% increase applied to fees and charges in respect of Piers & Harbours to
fund the Asset Management plan would equate to an additional £0.272m.
Page 80

Page 81

7. IMPLICATIONS 
7.1 Policy – Outlines the proposed increases to fees and charges for 2025-26.  
7.2 Financial - The annual adjustment to fees and charges ensures that charges
remain relevant to service costs which enables the Council to maintain
proportionate income levels in order to sustain services. 
7.3 Legal – None.
7.4 HR – None.
7.5 Fairer Scotland Duty: See below 
7.5.1 Equalities –The proposed changes apply equally to everyone who receives a
service which the Council will continue to charge for. Therefore there are no
anticipated adverse equality issues arising from this report. 
7.5.2 Socio-Economic Duty - Mainly inflationary increases therefore limited impact. 
7.5.3 Islands Duty - Mainly inflationary increases therefore limited impact. 
7.6 Climate Change – None
7.7 Risk – Minimal risk.
7.8 Customer Service - Minimal risk in respect of the inflationary increases. 
7.9 The Rights of the Child (UNCRC) - None  
Kirsty Flanagan
Executive Director/Section 95 Officer
13 February 2025 
Policy Lead for Finance and Commercial Services - Councillor Ross Moreland 
Appendix 1 – Schedule of Fees and Charges 
For further information contact Carolyn Earl, Interim Head of Financial Services
carolyn.earl@argyll-bute.gov.uk
Page 81

Page 82

Appendix 1
INDEX Page
Social Work 2
Education 3
Legal and Regulatory Support / Commercial Services 4-8
Customer Support Services 9-10
Planning Environmental Health & Housing
Local Development Plans and Printing 11
Environmental Health 11-15
Planning Services 15-16
Building Standards 16
Housing 16-17
Waste Management
Waste Collection 18
Commercial Refuse 19
Recycling Charges 19-21
Skips 21-22
Householder Scrap Car Removal and Disposal Service 22-23
Waste Disposal 23
Amenities
Public Conveniences 24
Pest Control 24
Dog Fees 24
Room Hire -Hermitage Park Pavilion 24-25
Playing Fields 25
Outdoor Recreation 25
Fairs 25-26
Floral Decorations 26
Burial Charges 26-27
Crematorium Charges 27
Ferries, Piers and Harbours
Ferry Fares 28-29
Piers and Harbours  - Rates - Goods, Passengers and Vehicles 29-30
Piers and Harbours  - Rates - Miscellaneous 30-31
Piers and Harbours  - Rates - Vessels 31-33
Airfields 34-36
Network Management 37-38
School and Public Transport 38
Parking 39-40
Electric Vehicle Charging 40
Council Wide Charges 41
Filming 41
Fees and Charges for 2025-26
Page 1
Page 82

Page 83

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ % Notes/Comments
SOCIAL WORK
Local Authority Residential Care Provision (Community Care)
Weekly Charge (excluding Kintyre Care Centre) 1,705.50 Outwith the Scope 0.00 1,705.50 1,853.38
Outwith the
Scope 0.00 1,853.38 147.88 9%
Local Authority Residential Care Provision at Kintyre Care
Centre (Community Care) Weekly Charge 1,463.87 Outwith the Scope 0.00 1,463.87 1,598.61
Outwith the
Scope 0.00 1,598.61 134.74 9%
Local Authority Nursing Care Provision (Community Care)
Weekly Charge 1,705.50 Outwith the Scope 0.00 1,705.50 1,853.38
Outwith the
Scope 0.00 1,853.38 147.88 9%
Non - Residential Services - Lunch Clubs - per meal 5.40 Outwith the Scope 0.00 5.40 5.70
Outwith the
Scope 0.00 5.70 0.30 6%
Non - Residential Services - Telecare - Community Alarms -
per week 6.45 Outwith the Scope 0.00 6.45 6.85
Outwith the
Scope 0.00 6.85 0.40 6%
Non - Residential Services - Telecare - Care Assist System -
per week 5.50 Outwith the Scope 0.00 5.50 5.85
Outwith the
Scope 0.00 5.85 0.35 6%
Non - Residential Services - Telecare - Mobile Devices and
Monitoring - per week 3.05 Outwith the Scope 0.00 3.05 3.24
Outwith the
Scope 0.00 3.24 0.19 6%
Non - Residential Services - Telecare - Canary System - per
week 2.40 Outwith the Scope 0.00 2.40 2.55
Outwith the
Scope 0.00 2.55 0.15 6%
Non - Residential Services - Home Help - hourly rate 25.62 Outwith the Scope 0.00 25.62 27.16
Outwith the
Scope 0.00 27.16 1.54 6%
Adjusted to reflect estimated changes in staff
pay from April 2025.
Non - Residential Services - Housing Support - hourly rate 25.62 Outwith the Scope 0.00 25.62 27.16
Outwith the
Scope 0.00 27.16 1.54 6%
Adjusted to reflect estimated changes in staff
pay from April 2025.
Non - Residential Services - Employment Support - hourly rate 25.62 Outwith the Scope 0.00 25.62 27.16
Outwith the
Scope 0.00 27.16 1.54 6%
Adjusted to reflect estimated changes in staff
pay from April 2025.
Non - Residential Services -Sleepover Service - per night 133.92 Outwith the Scope 0.00 133.92 143.64
Outwith the
Scope 0.00 143.64 9.72 7%
Adjusted to reflect estimated changes in staff
pay from April 2025.
Non - Residential Services -Transport - per day 3.40 Outwith the Scope 0.00 3.40 3.60
Outwith the
Scope 0.00 3.60 0.20 6%
Adjusted to be divisible by 2 to enable one-
way charging
Non - Residential Services -Elderly Day Care - hourly rate 10.80 Outwith the Scope 0.00 10.80 11.45
Outwith the
Scope 0.00 11.45 0.65 6%
Adjusted to be divisible by 4 to reflect quarter
hour visits
Non - Residential Services -Learning Disability Resource
Centre Service - hourly rate 28.60 Outwith the Scope 0.00 28.60 30.30
Outwith the
Scope 0.00 30.30 1.70 6%
Adjusted to be divisible by 4 to reflect quarter
hour visits
Provision of Occupational Therapy Consultation - Per
assessment/consultation 300.30 Outwith the Scope 0.00 300.30 318.30
Outwith the
Scope 0.00 318.30 18.00 6%
Provision of Professional Services - Per Community Care
Assessment/ Consultation 752.60 Outwith the Scope 0.00 752.60 797.75
Outwith the
Scope 0.00 797.75 45.15 6%
Provision of Professional Services - Full needs assessment
only 571.45 Outwith the Scope 0.00 571.45 605.75
Outwith the
Scope 0.00 605.75 34.30 6%
Provision of Professional Services - Needs Review only 208.95 Outwith the Scope 0.00 208.95 221.50
Outwith the
Scope 0.00 221.50 12.55 6%
Children & Families - Local Authority Residential Care
Provision:   Dunclutha (weekly charge) 2,399.48 Outwith the Scope 0.00 2,399.48 3,416.76
Outwith the
Scope 0.00 3,416.76 1,017.28 42%
Charge levied to other HSCPs/Councils
buying places from Argyll and Bute.
Children & Families - Local Authority Residential Care
Provision: Shellach View (weekly Charge) 2,318.91 Outwith the Scope 0.00 2,318.91 3,317.76
Outwith the
Scope 0.00 3,317.76 998.85 43%
Charge levied to other HSCPs/Councils
buying places from Argyll and Bute.
Children & Families - Local Authority Residential Care
Provision: Helensburgh (weekly Charge) 2,273.57 Outwith the Scope 0.00 2,273.57 3,287.90
Outwith the
Scope 0.00 3,287.90 1,014.33 45%
Charge levied to other HSCPs/Councils
buying places from Argyll and Bute.
Children & Families - Other Charges - Inter Country Adoptions 7,889.25 Outwith the Scope 0.00 7,889.25 8,362.60
Outwith the
Scope 0.00 8,362.60 473.35 6%
Inter-Authority Substitute Family Care Placements:
Within Scotland
In line with British
Association of
Adoption and
Fostering (BAAF)
recommended
figures Outwith the Scope
Outwith the
Scope
In line with British Association of Adoption
and Fostering (BAAF) recommended figures.
Inter-Authority Substitute Family Care Placements:
Elsewhere - 1 child
In line with British
Association of
Adoption and
Fostering (BAAF)
recommended
figures Outwith the Scope
Outwith the
Scope
In line with British Association of Adoption
and Fostering (BAAF) recommended figures.
Inter-Authority Substitute Family Care Placements:
Elsewhere - 2 children (siblings placed together)
In line with British
Association of
Adoption and
Fostering (BAAF)
recommended
figures Outwith the Scope
Outwith the
Scope
In line with British Association of Adoption
and Fostering (BAAF) recommended figures.
Inter-Authority Substitute Family Care Placements:
Elsewhere - 3 children (siblings placed together)
In line with British
Association of
Adoption and
Fostering (BAAF)
recommended
figures Outwith the Scope
Outwith the
Scope
In line with British Association of Adoption
and Fostering (BAAF) recommended figures.
NB for 2025-26 Hostel charges moved to Education
2024-25 Increase2025-26
Social Work Page 2
Page 83

Page 84

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
EDUCATION CHARGES
Primary School Letting Charges per hour - Non-Profit
Organisations (room let) 14.20 Exempt 0.00 14.20 15.05 Exempt 0.00 15.05 0.85 6%
Primary School Letting Charges per hour - Commercial Rate
(room let) 39.40 Exempt 0.00 39.40 41.75 Exempt 0.00 41.75 2.35 6%
Primary School Letting Charges per hour - Non-Profit
Organisations (sports facilities) 14.71 Standard 2.94 17.65 15.58 Standard 3.12 18.70 1.05 6%
Primary School Letting Charges per hour - Commercial Rate
(sports facilities) 40.08 Standard 8.02 48.10 42.50 Standard 8.50 51.00 2.90 6%
Primary School Synthetic All Weather Pitch charge per hour -
Non-Profit Organisations - MAKI 57.96 Standard 11.59 69.55 61.42 Standard 12.28 73.70 4.15 6%
Primary School Synthetic All Weather Pitch charge per hour -
Non-Profit Organisations - OLI 57.96 Standard 11.59 69.55 61.42 Standard 12.28 73.70 4.15 6%
Primary School Synthetic All Weather Pitch charge per hour -
Non-Profit Organisations - BUTE 57.96 Standard 11.59 69.55 61.42 Standard 12.28 73.70 4.15 6%
Primary School Synthetic All Weather Pitch charge per hour -
Non-Profit Organisations  - COWAL 57.96 Standard 11.59 69.55 61.42 Standard 12.28 73.70 4.15 6%
Primary School Synthetic All Weather Pitch charge per hour -
Non-Profit Organisations - H&L 57.96 Standard 11.59 69.55 61.42 Standard 12.28 73.70 4.15 6%
Primary School Synthetic All Weather Pitch charge per hour -
Commercial Rate 98.75 Standard 19.75 118.50 104.67 Standard 20.93 125.60 7.10 6%
Sale of Meals to Pupils - Per meal (Primary-without milk) 2.30 Exempt 0.00 2.30 2.30 Exempt 0.00 2.30 0.00 0% No inflation applied.
Sale of Meals to Pupils - Per meal (Secondary) 2.40 Exempt 0.00 2.40 2.40 Exempt 0.00 2.40 0.00 0% No inflation applied.
Section 23 Charges per annum - Parklands 53,159.55 Exempt 0.00 53,159.55 56,349.10 Exempt 0.00 56,349.10 3,189.55 6%
Inveraray Primary - Room hire - half day 46.40 Exempt 0.00 46.40 49.20 Exempt 0.00 49.20 2.80 6%
Inveraray Primary - Room hire - full day 83.35 Exempt 0.00 83.35 88.35 Exempt 0.00 88.35 5.00 6%
Inveraray Primary - Catering: Tea, Coffee and Scones 3.38 Standard 0.68 4.05 3.58 Standard 0.72 4.30 0.25 6%
Inveraray Primary - Catering: Soup and Sandwiches 6.58 Standard 1.32 7.90 6.96 Standard 1.39 8.35 0.45 6%
Instrumental Instruction charges - Per Annum 0.00 Exempt 0.00 0.00 0.00 Exempt 0.00 0.00 0.00 0%
Scottish Government's 100 day promise has
removed Instrumental Instruction Charges.
Hostel Charges - Room hire - children's hearing - half day 27.00 Exempt 0.00 27.00 28.60 Exempt 0.00 28.60 1.60 6%
Hostel Charges - Room hire - children's hearing - Full day 45.00 Exempt 0.00 45.00 47.70 Exempt 0.00 47.70 2.70 6%
Hostel Charges - Room hire - half day 45.00 Exempt 0.00 45.00 47.70 Exempt 0.00 47.70 2.70 6%
Hostel Charges - Room hire - full day 80.95 Exempt 0.00 80.95 85.80 Exempt 0.00 85.80 4.85 6%
Hostel Charges - Catering: Tea, Coffee and Biscuits 3.25 Standard 0.65 3.90 3.58 Standard 0.72 4.30 0.40 10%
Realigned with Inveraray Primary charges
Hostel Charges - Catering: Soup and Sandwiches 6.42 Standard 1.28 7.70 6.96 Standard 1.39 8.35 0.65 8%
Realigned with Inveraray Primary charges
Hostel Charges - accommodation - Argyll & Bute Council -
Bed & Breakfast 37.50 Standard 7.50 45.00 39.75 Standard 7.95 47.70 2.70 6%
Hostel Charges - accommodation - Argyll & Bute Council -
Half Board 52.58 Standard 10.52 63.10 55.75 Standard 11.15 66.90 3.80 6%
Hostel Charges - accommodation - Other Groups - Bed &
Breakfast 37.50 Standard 7.50 45.00 39.75 Standard 7.95 47.70 2.70 6%
Hostel Charges - accommodation - Other Groups - Half Board 52.58 Standard 10.52 63.10 55.75 Standard 11.15 66.90 3.80 6%
Hostel Charges - accommodation - Other Groups - Full Board 60.04 Standard 12.01 72.05 63.63 Standard 12.73 76.35 4.30 6%
Increase2025-262024-25
Education Page 3
Page 84

Page 85

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
LEGAL AND REGULATORY / COMMERCIAL SERVICES
Solicitors Property Enquiry Certificates 192.00 Standard 38.40 230.40 203.50 Standard 40.70 244.20 13.80 6%
Taxi Car Licence 533.00 Outwith the Scope 0.00 533.00 533.00 Outwith the Scope 0.00 533.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Private Hire Car Licence 533.00 Outwith the Scope 0.00 533.00 533.00 Outwith the Scope 0.00 533.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Taxi/Private Hire Car Driver Licence 133.00 Outwith the Scope 0.00 133.00 133.00 Outwith the Scope 0.00 133.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Second Hand Dealer Licence 533.00 Outwith the Scope 0.00 533.00 533.00 Outwith the Scope 0.00 533.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Second Hand Motor Dealer Licence 617.00 Outwith the Scope 0.00 617.00 617.00 Outwith the Scope 0.00 617.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Metal Dealer Licence 617.00 Outwith the Scope 0.00 617.00 617.00 Outwith the Scope 0.00 617.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Temporary exemption warrant - Metal Dealers 176.00 Outwith the Scope 0.00 176.00 176.00 Outwith the Scope 0.00 176.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Boat Hire Licence 324.00 Outwith the Scope 0.00 324.00 324.00 Outwith the Scope 0.00 324.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Street Trader Licence 324.00 Outwith the Scope 0.00 324.00 324.00 Outwith the Scope 0.00 324.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Street Trader - Charity/Temporary 107.00 Outwith the Scope 0.00 107.00 107.00 Outwith the Scope 0.00 107.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Market Operator Licence 617.00 Outwith the Scope 0.00 617.00 617.00 Outwith the Scope 0.00 617.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Market Operator - voluntary/charitable organisation holding
one event per year 205.00 Outwith the Scope 0.00 205.00 205.00 Outwith the Scope 0.00 205.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Public Entertainment Licence 617.00 Outwith the Scope 0.00 617.00 617.00 Outwith the Scope 0.00 617.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Public Entertainment temporary Licence 176.00 Outwith the Scope 0.00 176.00 176.00 Outwith the Scope 0.00 176.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Late hours catering licence 617.00 Outwith the Scope 0.00 617.00 617.00 Outwith the Scope 0.00 617.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Window Cleaner Licence 324.00 Outwith the Scope 0.00 324.00 324.00 Outwith the Scope 0.00 324.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Substitution of vehicle (taxi/private hire) - same day 107.00 Outwith the Scope 0.00 107.00 107.00 Outwith the Scope 0.00 107.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Substitution of vehicle (taxi/private hire) - within 5 days 78.00 Outwith the Scope 0.00 78.00 78.00 Outwith the Scope 0.00 78.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Certified copy of a licence 48.00 Outwith the Scope 0.00 48.00 48.00 Outwith the Scope 0.00 48.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Re-issue of a badge 48.00 Outwith the Scope 0.00 48.00 48.00 Outwith the Scope 0.00 48.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
2024-25 Increase2025-26
L&R Comm Page 4
Page 85

Page 86

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2024-25 Increase2025-26
Re-issue of taxi/private hire car plate 48.00 Outwith the Scope 0.00 48.00 48.00 Outwith the Scope 0.00 48.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Extract of Civic Government Register 43.00 Outwith the Scope 0.00 43.00 43.00 Outwith the Scope 0.00 43.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Copy of Civic Government Register 107.00 Outwith the Scope 0.00 107.00 107.00 Outwith the Scope 0.00 107.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Taxi Booking Office Licence 147.00 Outwith the Scope 0.00 147.00 147.00 Outwith the Scope 0.00 147.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Amendment to Civic Govt Licence 91.00 Outwith the Scope 0.00 91.00 91.00 Outwith the Scope 0.00 91.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Knife Dealers Licence 617.00 Outwith the Scope 0.00 617.00 617.00 Outwith the Scope 0.00 617.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Skin piercing & tattoo operator Licence (premises occupied by
them) 368.00 Outwith the Scope 0.00 368.00 368.00 Outwith the Scope 0.00 368.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Skin piercing & tattoo operator Licence (premises under
control of others) 295.00 Outwith the Scope 0.00 295.00 295.00 Outwith the Scope 0.00 295.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Vehicle Inspection Fee (per inspection note 50% surcharge
will be applied for re-inspection/appointment no show ) 95.00 Outwith the Scope 0.00 95.00 95.00 Outwith the Scope 0.00 95.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Letting of Kitchen Accommodation - Monday to Friday (charge
per hour) 25.92 Standard 5.18 31.10 27.46 Standard 5.49 32.95 1.85 6%
Letting of Kitchen Accommodation - Saturday & Sunday
(charge per hour) 29.33 Standard 5.87 35.20 31.08 Standard 6.22 37.30 2.10 6%
Letting of Kitchen Accommodation - Public Holiday (charge per
hour) 34.58 Standard 6.92 41.50 36.67 Standard 7.33 44.00 2.50 6%
Letting of Kitchen Accommodation - Failure to Reinstate 73.21 Standard 14.64 87.85 77.58 Standard 15.52 93.10 5.25 6%
Helensburgh & Lomond Civic Centre - Hire of Community
Room - up to 20 persons (Concession rate per hour Monday -
Friday 09:00 to 20:00) 21.33 Standard 4.27 25.60 21.33 Standard 4.27 25.60 0.00 0%
Helensburgh & Lomond Civic Centre - Hire of Community
Room - up to 20 persons (Concession rate per hour Saturday -
Sunday & Monday - Friday after 20:00) 27.33 Standard 5.47 32.80 27.33 Standard 5.47 32.80 0.00 0%
Helensburgh & Lomond Civic Centre - Hire of Community
Room - up to 20 persons (Commercial rate per hour Monday -
Friday 09:00 to 20:00) 26.21 Standard 5.24 31.45 26.21 Standard 5.24 31.45 0.00 0%
Helensburgh & Lomond Civic Centre - Hire of Community
Room - up to 20 persons (Commercial rate per hour Saturday -
Sunday & Monday - Friday after 20:00) 33.46 Standard 6.69 40.15 33.46 Standard 6.69 40.15 0.00 0%
Helensburgh & Lomond Civic Centre - Hire of Assembly Hall -
up to 100 persons (Concession rate per hour Monday - Friday
09:00 to 20:00) 29.79 Standard 5.96 35.75 29.79 Standard 5.96 35.75 0.00 0%
Helensburgh & Lomond Civic Centre - Hire of Assembly Hall -
up to 100 persons (Concession rate per hour Saturday -
Sunday & Monday - Friday after 20:00) 35.79 Standard 7.16 42.95 35.79 Standard 7.16 42.95 0.00 0%
Helensburgh & Lomond Civic Centre - Hire of Assembly Hall -
up to 100 persons (Commercial rate per hour Monday - Friday
09:00 to 20:00) 36.54 Standard 7.31 43.85 36.54 Standard 7.31 43.85 0.00 0%
Helensburgh & Lomond Civic Centre - Hire of Assembly - up to
100 persons (Commercial rate per hour Saturday -Sunday &
Monday - Friday after 20:00) 43.88 Standard 8.78 52.65 43.88 Standard 8.78 52.65 0.00 0%
Helensburgh & Lomond Civic Centre - Hire of Annex Room 1 -
up to 30 persons (Concession rate per hour Monday - Friday
09:00 to 20:00) 19.38 Standard 3.88 23.25 19.38 Standard 3.88 23.25 0.00 0%
L&R Comm Page 5
Page 86

Page 87

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2024-25 Increase2025-26
Helensburgh & Lomond Civic Centre - Hire of Annex Room 1 -
up to 30 persons (Concession rate per hour Saturday -Sunday
& Monday - Friday after 20:00) 25.29 Standard 5.06 30.35 25.29 Standard 5.06 30.35 0.00 0%
Helensburgh & Lomond Civic Centre - Hire of Annex Room 1 -
up to 30 persons (Commercial rate per hour Monday - Friday
09:00 to 20:00) 23.75 Standard 4.75 28.50 23.75 Standard 4.75 28.50 0.00 0%
Helensburgh & Lomond Civic Centre - Hire of Annex Room 1 -
up to 30 persons (Commercial rate per hour Saturday -Sunday
& Monday - Friday after 20:00) 31.04 Standard 6.21 37.25 31.04 Standard 6.21 37.25 0.00 0%
Helensburgh & Lomond Civic Centre - Hire of Annex Room 2 -
up to 20 persons (Concession rate per hour Monday - Friday
09:00 to 20:00) 15.42 Standard 3.08 18.50 15.42 Standard 3.08 18.50 0.00 0%
Annex Room 2 will be offered half price if
booked in combination with Annex Room 1
For concessions either £9.25 or £12.80 or
Commercial either £11.33 or £15.73
Helensburgh & Lomond Civic Centre - Hire of Annex Room 2 -
up to 20 persons (Concession rate per hour Saturday -Sunday
& Monday - Friday after 20:00) 21.33 Standard 4.27 25.60 21.33 Standard 4.27 25.60 0.00 0%
Annex Room 2 will be offered half price if
booked in combination with Annex Room 1
For concessions either £9.25 or £12.80 or
Commercial either £11.33 or £15.73
Helensburgh & Lomond Civic Centre - Hire of Annex Room 2 -
up to 20 persons (Commercial rate per hour Monday - Friday
09:00 to 20:00) 18.88 Standard 3.78 22.65 18.88 Standard 3.78 22.65 0.00 0%
Annex Room 2 will be offered half price if
booked in combination with Annex Room 1
For concessions either £9.25 or £12.80 or
Commercial either £11.33 or £15.73
Helensburgh & Lomond Civic Centre - Hire of Annex Room 2 -
up to 20 persons (Commercial rate per hour Saturday -Sunday
& Monday - Friday after 20:00) 26.21 Standard 5.24 31.45 26.21 Standard 5.24 31.45 0.00 0%
Annex Room 2 will be offered half price if
booked in combination with Annex Room 1
For concessions either £9.25 or £12.80 or
Commercial either £11.33 or £15.73
Helensburgh & Lomond Civic Centre - Hire of Annex Room 1
and 2 (Concession rate per hour Monday - Friday 09:00 to
20:00) 27.08 Standard 5.42 32.50 27.08 Standard 5.42 32.50 0.00 0%
Helensburgh & Lomond Civic Centre - Hire of Annex Room 1
and 2 (Concession rate per hour Saturday -Sunday & Monday -
Friday after 20:00) 36.00 Standard 7.20 43.20 36.00 Standard 7.20 43.20 0.00 0%
Helensburgh & Lomond Civic Centre - Hire of Annex Room 1
and 2 (Commercial rate per hour Monday - Friday 09:00 to
20:00) 35.13 Standard 7.03 42.15 35.13 Standard 7.03 42.15 0.00 0%
Helensburgh & Lomond Civic Centre - Hire of Annex Room 1
and 2 (Commercial rate per hour Saturday -Sunday & Monday -
Friday after 20:00) 46.83 Standard 9.37 56.20 46.83 Standard 9.37 56.20 0.00 0%
Helensburgh & Lomond Civic Centre - Hire of Marriage
Suite/Function Room(Concession rate per hour Monday -
Friday 09:00 to 20:00) 26.79 Standard 5.36 32.15 26.79 Standard 5.36 32.15 0.00 0%
Helensburgh & Lomond Civic Centre - Hire of Marriage
Suite/Function Room (Concession rate per hour Saturday -
Sunday & Monday - Friday after 20:00) 32.79 Standard 6.56 39.35 32.79 Standard 6.56 39.35 0.00 0%
Helensburgh & Lomond Civic Centre - Hire of Marriage
Suite/Function Room (Commercial rate per hour Monday -
Friday 09:00 to 20:00) 34.88 Standard 6.98 41.85 34.88 Standard 6.98 41.85 0.00 0%
Helensburgh & Lomond Civic Centre - Hire of Marriage
Suite/Function Room (Commercial rate per hour Saturday -
Sunday & Monday - Friday after 20:00) 42.67 Standard 8.53 51.20 42.67 Standard 8.53 51.20 0.00 0%
TRADING STANDARDS
L&R Comm Page 6
Page 87

Page 88

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2024-25 Increase2025-26
Explosives/Fireworks - Issue of Store Licence (i.e. when
separation distances apply)
STATUTORY
CHARGE 202.00 Outwith the Scope 0.00 202.00 202.00 Outwith the Scope 0.00 202.00 0.00 0%
All explosives and fireworks fees are set by
the UK Government and can be found in
Schedule 7 of the current Health and Safety
and Nuclear (Fees) Regulations
These Regulations are subject to change at
short notice.
Explosives/Fireworks - Renewal of store licence (i.e. when
separation distances apply
STATUTORY
CHARGE 94.00 Outwith the Scope 0.00 94.00 94.00 Outwith the Scope 0.00 94.00 0.00 0%
All explosives and fireworks fees are set by
the UK Government and can be found in
Schedule 7 of the current Health and Safety
and Nuclear (Fees) Regulations
These Regulations are subject to change at
short notice.
Explosives/Fireworks - Issue of registration for keeping
explosives (i.e. when no separation distances apply)
STATUTORY
CHARGE 119.00 Outwith the Scope 0.00 119.00 119.00 Outwith the Scope 0.00 119.00 0.00 0%
All explosives and fireworks fees are set by
the UK Government and can be found in
Schedule 7 of the current Health and Safety
and Nuclear (Fees) Regulations
These Regulations are subject to change at
short notice.
Explosives/Fireworks - Renewal of registration for keeping
Explosives (i.e. when no separation distances apply)
STATUTORY
CHARGE 59.00 Outwith the Scope 0.00 59.00 59.00 Outwith the Scope 0.00 59.00 0.00 0%
All explosives and fireworks fees are set by
the UK Government and can be found in
Schedule 7 of the current Health and Safety
and Nuclear (Fees) Regulations
These Regulations are subject to change at
short notice.
Fee to transfer, vary or replace a licence or registration 
STATUTORY
CHARGE 40.00 Outwith the Scope 0.00 40.00 40.00 Outwith the Scope 0.00 40.00 0.00 0%
All explosives and fireworks fees are set by
the UK Government and can be found in
Schedule 7 of the current Health and Safety
and Nuclear (Fees) Regulations
These Regulations are subject to change at
short notice.
PETROLEUM
Notes to Fireworks & Explosives charges
1. If you keep fireworks, shotgun cartridges, certain bird scarers or other explosive products for sale you are likely to require an explosive licence.
2. You can generally store up to 2,000 kg of explosives with a licence issued by us, although there are some conditions relating to its storage.
3. We will need to know the hazard type and quantity of the explosives you wish to store to determine whether your store is suitable.
4. The quantity you will be allowed to store will depend on the hazard type of the explosives.
5. Regulation 27 of the Explosives Regulation 2014 sets out the distances that must be maintained between a store and a building or other place. This is known as the separation distance. You will not normally be required to maintain separation
distances if you store no more than: a) 250kg hazard type 4 b) 25kg hazard type 3 (or combination of hazard type 3 and hazard type 4)
6. The most common fees for storage of fireworks for one year are set out below. Discounted rates are available for periods of 2-5 years.
7. Prices for other types of explosive licences are available upon request.
8. All fees for storage of explosives are set by the UK Government, and can currently be found in Schedule 7 of the Health and Safety and Nuclear (Fees) Regulations as amended by the Health and Safety and Nuclear (Fees) (Amendment) Regulations
2023. These regulations are subject to change at short notice.
Notes to Petroleum charges
1. A fee is payable to store petrol under regulation 6 (petrol filling stations) or regulation 14 (non work-place storage) of the Petroleum (Consolidation) Regulations 2014. All fees for storage of petroleum are set by the UK Government, and can currently be found in
Schedule 7 of the Health and Safety and Nuclear (Fee)s Regulations 2022 as amended by the Health and Safety and Nuclear (Fees) (Amendment) Regulations 2023.. These regulations are subject to change at short notice.
2. The current fees for a certificate or licence for one year are shown below. Prices for multiple-year certificates or licences are available on request.
3. Historical Records - We hold historical records of tanks previously licensed for the storage of petroleum spirit. Information regarding specific premises and whether tanks were present and the methods used for making them safe from the danger of fire or explosion can
be disclosed on written request. The disclosure is subject to payment of a reasonable fee.
L&R Comm Page 7
Page 88

Page 89

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2024-25 Increase2025-26
Petrol Storage Certificate or Licence to keep petroleum spirit
of a quantity <2500 litres
STATUTORY
CHARGE 48.00 Outwith the Scope 0.00 48.00 48.00 Outwith the Scope 0.00 48.00 0.00 0%
All petroleum storage fees are set by the UK
Government and can be found in Schedule
7 of the current Health and Safety and
Nuclear (Fees) Regulations
These Regulations are subject to change at
short notice.
Petrol Storage Certificate or Licence to keep petroleum spirit
of a quantity  between 2500 and 50000 litres
STATUTORY
CHARGE 65.00 Outwith the Scope 0.00 65.00 65.00 Outwith the Scope 0.00 65.00 0.00 0%
All petroleum storage fees are set by the UK
Government and can be found in Schedule
7 of the current Health and Safety and
Nuclear (Fees) Regulations
These Regulations are subject to change at
short notice.
Petrol Storage Certificate or Licence to keep petroleum spirit
of a quantity > 50000 litres
STATUTORY
CHARGE 137.00 Outwith the Scope 0.00 137.00 137.00 Outwith the Scope 0.00 137.00 0.00 0%
All petroleum storage fees are set by the UK
Government and can be found in Schedule
7 of the current Health and Safety and
Nuclear (Fees) Regulations
These Regulations are subject to change at
short notice.
Historical Records - Charge for Officer time (per hour) - out of
hours or weekend work incurs a 50% surcharge on the hourly
rate
Officer cost per
hour 91.50 Standard 18.30 109.80 97.00 Standard 19.40 116.40 6.60 6%
Disclosure of historical records is subject to
a reasonable hourly fee
Metrology
Weights and Measures:- all certification & verification work –
Weights & Measures Inspector.
Officer cost per
hour 91.50 Standard 18.30 109.80 97.00 Standard 19.40 116.40 6.60 6%
Weights and Measures:- all certification & verification work –
Assisting Officer.
Officer cost per
hour 61.04 Standard 12.21 73.25 64.71 Standard 12.94 77.65 4.40 6%
Certificate of Errors: Request for certificate
Calibration
Certificate cost 55.29 Standard 11.06 66.35 58.63 Standard 11.73 70.35 4.00 6%
Note: When supplying specialist equipment (including
but not limited to weighbridge test unit, van and test
weights, etc) an additional fee may be charged hourly,
daily or per appointment, according to circumstance
Prices on
application
Notes to Metrology (Weights & Measures) Calibration Charges
1. The 2023/24 guidance is based on a chargeable rate of £103.60 per officer per hour, designed to facilitate full cost recovery for metrological activity.  A charge is made per officer hour spent at the place of submission of the equipment for the purposes of examination,
adjustment, testing or retesting of the equipment.  It should be noted that the time taken should be quoted on the account and should not include any time spent on research or on travel to the site at which the equipment is to be tested.                                                                                                                      
2. An additional charge of £69.10 per hour will be applied when another officer is required to provide assistance to the inspector.
3.  For any work not covered by this guidance, or which varies significantly or is carried out in exceptional circumstances, an appropriate charge may be calculated as a surcharge to the hourly rate.
4. When a visit is made by a Trading Standards Officer to any premises for the purpose of carrying out any calibration functions, each visit may be subject to a minimum charge of £103.60 per Officer per visit regardless of the nature or amount of work requested or
completed.
5.  Visits carried out partly or entirely outside of normal office hours may incur a surcharge of 50% of the standard hourly rate per Officer per hour.
6. The guidance relates to the cost of testing single items. Inspectors should not be inhibited from departing from the quoted fee in locally determined circumstances. Discounted fees may be appropriate, for example, in the following circumstances:
a. Where more than a single item is submitted on one occasion and particularly where large quantities are involved;
b. Where facilities, equipment or assistance are provided by the submitter by prior arrangement;
7. When supplying specialist equipment (including but not limited to weighbridge test unit, van and test weights, etc) an additional fee may be charged hourly, daily or per appointment, according to circumstance.
VAT rate applies unless work undertaken
under the Measuring Instruments (EEC
Requirements) Regs 1988.
L&R Comm Page 8
Page 89

Page 90

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
CUSTOMER SUPPORT SERVICES
Commission on trade union deductions 2.50% Standard 2.50% 2.50% Standard 2.50%
Percentage charge - same as previous year
Arrestment handling charge per item 0.83 Standard 0.17 1.00 0.83 Standard 0.17 1.00 0.00 0%
This is a Statutory Charge.  The maximum
that can be charged is £1
Info to Banks etc - Handling Charge 26.79 Standard 5.36 32.15 28.42 Standard 5.68 34.10 1.95 6%
Registrars Fees and Charges (Extracts at time of registration) 10.00 Outwith the Scope 0.00 10.00 10.00 Outwith the Scope 0.00 10.00 0.00 0%
Set by Registrar General - no increase for
2025-26
Registrars Fees and Charges (Extracts outwith a calendar
month of registration) 15.00 Outwith the Scope 0.00 15.00 15.00 Outwith the Scope 0.00 15.00 0.00 0%
Set by Registrar General - no increase for
2025-26
Registrars Search & Genealogy - Particular Search 5.00 Outwith the Scope 0.00 5.00 5.00 Outwith the Scope 0.00 5.00 0.00 0%
Set by Registrar General - no increase for
2025-26
Registrars Search & Genealogy - General Search 15.00 Outwith the Scope 0.00 15.00 15.00 Outwith the Scope 0.00 15.00 0.00 0%
Set by Registrar General - no increase for
2025-26
Registrars - Recording of name, or change of name or
surname or alternative name 40.00 Outwith the Scope 0.00 40.00 40.00 Outwith the Scope 0.00 40.00 0.00 0%
Set by Registrar General - no increase for
2025-26
Registrars - Printing a copy certificate (for delivering see rows
13 and 14) 15.00 Outwith the Scope 0.00 15.00 15.00 Outwith the Scope 0.00 15.00 0.00 0%
Set by Registrar General - no increase for
2025-26
Registrars - Delivering a copy certifificate within the UK 3.00 Outwith the Scope 0.00 3.00 3.20 Outwith the Scope 0.00 3.20 0.20 7%
Postage element for row 12
Registrars - Delivering copy certificate outwith the UK 6.00 Outwith the Scope 0.00 6.00 6.35 Outwith the Scope 0.00 6.35 0.35 6%
Postage element for row 12
Marriage Notices (Per Person) 45.00 Outwith the Scope 0.00 45.00 45.00 Outwith the Scope 0.00 45.00 0.00 0%
Set by Registrar General - no increase for
2024-25
Civil Marriage/Partnership Solemnisation 55.00 Outwith the Scope 0.00 55.00 55.00 Outwith the Scope 0.00 55.00 0.00 0%
Set by Registrar General - no increase for
2024-25
Registrars Rental Income - Registrars Office Wedding 119.65 Outwith the Scope 0.00 119.65 126.85 Outwith the Scope 0.00 126.85 7.20 6%
Registrars Rental Income - Registrars Office Wedding -
Saturday 240.90 Outwith the Scope 0.00 240.90 255.35 Outwith the Scope 0.00 255.35 14.45 6%
Admin charges, approved venue weekday 315.45 Outwith the Scope 0.00 315.45 334.40 Outwith the Scope 0.00 334.40 18.95 6%
Admin charges, approved venue Saturday 374.40 Outwith the Scope 0.00 374.40 396.85 Outwith the Scope 0.00 396.85 22.45 6%
Admin charges, evenings after 6pm 425.75 Outwith the Scope 0.00 425.75 451.30 Outwith the Scope 0.00 451.30 25.55 6%
Admin charges, Sundays & Public Holidays (excl. Easter &
Christmas) 475.50 Outwith the Scope 0.00 475.50 504.05 Outwith the Scope 0.00 504.05 28.55 6%
Blue Badges 20.00 Outwith the Scope 0.00 20.00 20.00 Outwith the Scope 0.00 20.00 0.00 0%
Set by Scottish Government
Registrars Travel Fees - rate per mile 0.60 Zero Rated 0.00 0.60 0.60 Zero Rated 0.00 0.60 0.00 0%
Customer Service Point Room Hire - Non Profit Organisations
(room let) 14.20 Exempt 0.00 14.20 15.05 Exempt 0.00 15.05 0.85 6%
Customer Service Point Room Hire - Non Profit Organisations
(room let) - Half day 46.40 Exempt 0.00 46.40 49.20 Exempt 0.00 49.20 2.80 6%
Customer Service Point Room Hire - Non Profit Organisations
(room let) - Full day 83.35 Exempt 0.00 83.35 88.35 Exempt 0.00 88.35 5.00 6%
Customer Service Point Room Hire - Commercial Rate (room
let) 39.40 Exempt 0.00 39.40 41.75 Exempt 0.00 41.75 2.35 6%
Naming Ceremonies at Registration Office - Monday - Friday 90.00 Standard 18.00 108.00 95.00 Standard 19.00 114.00 6.00 6%
Naming Ceremonies at Registration Office - Saturday 120.00 Standard 24.00 144.00 127.50 Standard 25.50 153.00 9.00 6%
Naming Ceremonies at a Venue or Location - Monday - Friday 129.17 Standard 25.83 155.00 136.67 Standard 27.33 164.00 9.00 6%
Naming Ceremonies at a Venue or Location - Saturday 159.17 Standard 31.83 191.00 168.33 Standard 33.67 202.00 11.00 6%
2024-25 2025-26 Increase
Customer Support Services Page 9
Page 90

Page 91

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
CUSTOMER SUPPORT SERVICES
2024-25 2025-26 Increase
Naming Ceremonies - Additional charge if a second
registration escort is required for a large ceremony 50.00 Standard 10.00 60.00 53.00 Standard 10.60 63.60 3.60 6%
Per email from Bob Miller - to be increased
at 6% (rather than rounded to nearest £)
NB - Formula adjusted in cell K
Naming Ceremonies - Additional charge for each child of the
same family 10.00 Standard 2.00 12.00 10.60 Standard 2.12 12.72 0.72 6%
Per email from Bob Miller - to be increased
at 6% (rather than rounded to nearest £)
NB - Formula adjusted in cell K
Naming Ceremonies - Additional charge if held as part of a
civil marriage/partnership 50.00 Standard 10.00 60.00 53.00 Standard 10.60 63.60 3.60 6%
Per email from Bob Miller - to be increased
at 6% (rather than rounded to nearest £)
NB - Formula adjusted in cell K
Renewal of Vows Ceremony at Registration Office - Monday -
Friday 150.00 Standard 30.00 180.00 159.17 Standard 31.83 191.00 11.00 6%
Renewal of Vows Ceremony at Registration Office - Saturday 199.17 Standard 39.83 239.00 210.83 Standard 42.17 253.00 14.00 6%
Renewal of Vows Ceremony at a Venue or Location - Monday
- Friday 219.17 Standard 43.83 263.00 232.50 Standard 46.50 279.00 16.00 6%
Renewal of Vows Ceremony at a Venue or Location -
Saturday 219.17 Standard 43.83 263.00 232.50 Standard 46.50 279.00 16.00 6%
Renewal of Vows - Additional charge if a second registration
escort is required for a large ceremony 50.00 Standard 10.00 60.00 53.00 Standard 10.60 63.60 3.60 6%
Per email from Bob Miller - to be increased
at 6% (rather than rounded to nearest £)
NB - Formula adjusted in cell K
Extract/Search of Lair Register on Islands 37.00 Outwith the Scope 0.00 37.00 39.00 Outwith the Scope 0.00 39.00 2.00 5%
Funeral Ceremony  - Monday - Friday 150.00 Exempt 0.00 150.00 150.00 Exempt 0.00 150.00 0.00 0%
Funeral Ceremony -  Saturday 250.00 Exempt 0.00 250.00 250.00 Exempt 0.00 250.00 0.00 0%
Customer Support Services Page 10
Page 91

Page 92

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
LOCAL DEVELOPMENT PLAN & PRINTING
Local Development Plan (Incl of P&P) - Proposals Maps Book 67.15 Outwith the Scope 0.00 67.15 71.20 Outwith the Scope 0.00 71.20 4.05 6% Replacing all Local Plans. Community
Councils 50% reduction
Local Development Plan (Incl of P&P) - Written Statement 33.50 Outwith the Scope 0.00 33.50 35.50 Outwith the Scope 0.00 35.50 2.00 6% Replacing all Local Plans. Community
Councils 50% reduction
Landscape Capacity Study (Incl P&P) - Bute & Cowal 30.95 Outwith the Scope 0.00 30.95 32.80 Outwith the Scope 0.00 32.80 1.85 6%
Landscape Capacity Study (Incl P&P) - Mull 14.75 Outwith the Scope 0.00 14.75 15.65 Outwith the Scope 0.00 15.65 0.90 6%
Landscape Capacity Study (Incl P&P) - North & South Kintyre 17.75 Outwith the Scope 0.00 17.75 18.80 Outwith the Scope 0.00 18.80 1.05 6%
Landscape Capacity Study (Incl P&P) - Lorn 35.25 Outwith the Scope 0.00 35.25 37.35 Outwith the Scope 0.00 37.35 2.10 6%
Landscape Capacity Study (Incl P&P) - Mid Argyll & Inveraray 22.40 Outwith the Scope 0.00 22.40 23.75 Outwith the Scope 0.00 23.75 1.35 6%
Landscape Capacity Study (Incl P&P) - Islay 11.65 Outwith the Scope 0.00 11.65 12.35 Outwith the Scope 0.00 12.35 0.70 6%
Location Plans (10 Copies) 35.70 Outwith the Scope 0.00 35.70 37.85 Outwith the Scope 0.00 37.85 2.15 6%
Printing - Internal Service Only - A2 Prints each 11.35 Outwith the Scope 0.00 11.35 12.05 Outwith the Scope 0.00 12.05 0.70 6%
Printing - Internal Service Only - A2 Prints (+11) each 8.10 Outwith the Scope 0.00 8.10 8.60 Outwith the Scope 0.00 8.60 0.50 6%
Printing - Internal Service Only - A1 Prints (1-10 copies) each 16.10 Outwith the Scope 0.00 16.10 17.05 Outwith the Scope 0.00 17.05 0.95 6%
Printing - Internal Service Only - A1 Prints (+11 copies) each 12.90 Outwith the Scope 0.00 12.90 13.65 Outwith the Scope 0.00 13.65 0.75 6%
Printing - Internal Service Only - A0 Prints (1-10 copies) each
24.20
Outwith the Scope 0.00 24.20 25.65 Outwith the Scope 0.00 25.65 1.45 6%
Printing - Internal Service Only - A0 Prints (+11 copies) each
21.10
Outwith the Scope 0.00 21.10 22.35 Outwith the Scope 0.00 22.35 1.25 6%
Statutory Street Naming and/or numbering of one property
110.40
Outwith the Scope 0.00 110.40 117.00 Outwith the Scope 0.00 117.00 6.60 6%
Statutory Street Naming and/or numbering for the 2nd and
each additional property 55.25
Outwith the Scope 0.00 55.25 58.55 Outwith the Scope 0.00 58.55 3.30 6%
Statutory Street Naming a new street
241.45
Outwith the Scope 0.00 241.45 255.95 Outwith the Scope 0.00 255.95 14.50 6%
Changing a property name or adding to the Royal Mail
database 106.60
Outwith the Scope 0.00 106.60 113.00 Outwith the Scope 0.00 113.00 6.40 6%
Confirming an address to a solicitor, property owner or any
organisation - per letter 71.15
Outwith the Scope 0.00 71.15 75.40 Outwith the Scope 0.00 75.40 4.25 6%
Phase 1 Habitat Surveys
469.45
Outwith the Scope 0.00 469.45 497.60 Outwith the Scope 0.00 497.60 28.15 6% Travel to be charged at Council Rate 45p/mile
Possible overnight stay to be charged at a
maximum of £50.
ENVIRONMENTAL HEALTH
Food Examination - Export of Food/Fish Certificates Per Certificate
115.10
Outwith the Scope 0.00 115.10 122.00 Outwith the Scope 0.00 122.00 6.90 6%
Food Examination - Export of Food/Fish Certificates - less
than 60kg in weight
Per Certificate
50.05
Outwith the Scope 0.00 50.05 53.05 Outwith the Scope 0.00 53.05 3.00 6%
Food Examination - Condemnation Certificate (Voluntary
Surrender)
259.13
Standard 51.83 310.95 274.67 Standard 54.93 329.60 18.65 6%
Licences/Registration - Riding Establishment Act 1964/70 Vets Fees to be
added 518.50
Outwith the Scope 0.00 518.50 549.60 Outwith the Scope 0.00 549.60 31.10 6%
Licences/Registration - Dangerous Wild Animals Act 1976 Vets Fees to be
added 408.50
Outwith the Scope 0.00 408.50 433.00 Outwith the Scope 0.00 433.00 24.50 6%
Animal Welfare (Licensing of Activities Involving Animals)
(Scotland) Regulations 2021,
Animal Welfare Establishment - New licence
Vets Fees to be
added
256.65
Outwith the Scope 0.00 256.65 272.05 Outwith the Scope 0.00 272.05 15.40 6% Charitable discount – 50% (applies to
registered Scottish Charities and SCIOs)
2024-25 Increase2025-26
Renaming or renumbering a street - pricing as
for new properties
Planning, Environ Hlth & Hous Page 11
Page 92

Page 93

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2024-25 Increase2025-26
Animal Welfare (Licensing of Activities Involving Animals)
(Scotland) Regulations 2021,
Animal Welfare Establishment - Variation of licence
Vets Fees to be
added
205.25
Outwith the Scope 0.00 205.25 217.55 Outwith the Scope 0.00 217.55 12.30 6% Charitable discount – 50% (applies to
registered Scottish Charities and SCIOs)
Animal Welfare (Licensing of Activities Involving Animals)
(Scotland) Regulations 2021,
Animal Welfare Establishment - Licensing enforcement visit
No. 1
Vets Fees to be
added
213.85
Outwith the Scope 0.00 213.85 226.70 Outwith the Scope 0.00 226.70 12.85 6% Subsequent enforcement visits: charged at
hourly rate of £32.27 in half-hourly increments
Animal Welfare (Licensing of Activities Involving Animals)
(Scotland) Regulations 2021,
Dog, Cat or Rabbit Breeding - New licence
Vets Fees to be
added
205.25
Outwith the Scope 0.00 205.25 217.55 Outwith the Scope 0.00 217.55 12.30 6% Charitable discount – 50% (applies to
registered Scottish Charities and SCIOs)
Animal Welfare (Licensing of Activities Involving Animals)
(Scotland) Regulations 2021,
Dog, Cat or Rabbit Breeding - Variation of licence
Vets Fees to be
added
153.95
Outwith the Scope 0.00 153.95 163.20 Outwith the Scope 0.00 163.20 9.25 6% Charitable discount – 50% (applies to
registered Scottish Charities and SCIOs)
Animal Welfare (Licensing of Activities Involving Animals)
(Scotland) Regulations 2021,
Dog, Cat or Rabbit Breeding - Licensing enforcement visit No.
1
Vets Fees to be
added
179.60
Outwith the Scope 0.00 179.60 190.40 Outwith the Scope 0.00 190.40 10.80 6% Subsequent enforcement visits: charged at
hourly rate of £32.27 in half-hourly increments
Animal Welfare (Licensing of Activities Involving Animals)
(Scotland) Regulations 2021,
• Operating a business of selling animals as pets
• animal rehoming activities (other than operating as an animal
welfare establishment)
New licence
Vets Fees to be
added
222.40
Outwith the Scope 0.00 222.40 235.75 Outwith the Scope 0.00 235.75 13.35 6% Charitable discount – 50% (applies to
registered Scottish Charities and SCIOs)
Animal Welfare (Licensing of Activities Involving Animals)
(Scotland) Regulations 2021,
• Operating a business of selling animals as pets
• animal rehoming activities (other than operating as an animal
welfare establishment)
Variation of licence
Vets Fees to be
added
171.10
Outwith the Scope 0.00 171.10 181.35 Outwith the Scope 0.00 181.35 10.25 6% Charitable discount – 50% (applies to
registered Scottish Charities and SCIOs)
Animal Welfare (Licensing of Activities Involving Animals)
(Scotland) Regulations 2021,
• Operating a business of selling animals as pets
• animal rehoming activities (other than operating as an animal
welfare establishment)
Licensing enforcement visit No. 1
Vets Fees to be
added
196.75
Outwith the Scope 0.00 196.75 208.55 Outwith the Scope 0.00 208.55 11.80 6% Subsequent enforcement visits: charged at
hourly rate of £32.27 in half-hourly increments
Licences/Registration - Animal Boarding Establishments Act
1963
Vets Fees to be
added 221.30
Outwith the Scope 0.00 221.30 234.60 Outwith the Scope 0.00 234.60 13.30 6%
Licences/Registration - Animal Boarding Establishments Act
1963 (Home boarding)
Vets Fees to be
added 153.50
Outwith the Scope 0.00 153.50 162.70 Outwith the Scope 0.00 162.70 9.20 6%
Licences/Registration - Zoo Act Vets Fees to be
added 1,233.05
Outwith the Scope 0.00 1,233.05 1,307.05 Outwith the Scope 0.00 1,307.05 74.00 6%
Licences/Registration - Venison Dealers
211.10
Outwith the Scope 0.00 211.10 223.75 Outwith the Scope 0.00 223.75 12.65 6%
Licences/Registration - Cinema Licence STATUTORY
CHARGE
600.00
Outwith the Scope 0.00 600.00 600.00 Outwith the Scope 0.00 600.00 0.00 0% Capped at £600 by the Cinemas Act
Charitable discount – 50%
(applies to registered Scottish Charities and
SCIOs only)
HMO - premises of up to 10 persons
1,011.15
Outwith the Scope 0.00 1,011.15  1,071.80 Outwith the Scope 0.00 1,071.80 60.65 6% Tri-Annual Licence
HMO - premises with more than 10 persons
1,237.25
Outwith the Scope 0.00 1,237.25  1,311.50 Outwith the Scope 0.00 1,311.50 74.25 6% Tri-Annual Licence
HMO- Amendment to HMO licence
149.30
Outwith the Scope 0.00 149.30     158.25 Outwith the Scope 0.00 158.25 8.95 6%
HMO - Refund if a new/renewal application is unsuccessful
252.90
Outwith the Scope 0.00 252.90 268.05 Outwith the Scope 0.00 268.05 15.15 6%
Performing Animals Licence application/renewal
142.35
Outwith the Scope 0.00 142.35 150.90 Outwith the Scope 0.00 150.90 8.55 6% Vet Fees to be added
Residential Caravan sites- first or new application
739.05
Outwith the Scope 0.00 739.05 783.40 Outwith the Scope 0.00 783.40 44.35 6% 5 year licence
Planning, Environ Hlth & Hous Page 12
Page 93

Page 94

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2024-25 Increase2025-26
Residential Caravan sites- renewal submitted before expiry
date 596.05
Outwith the Scope 0.00 596.05 631.80 Outwith the Scope 0.00 631.80 35.75 6% 5 year licence
Residential Caravan sites- renewal submitted after expiry date
739.05
Outwith the Scope 0.00 739.05 783.40 Outwith the Scope 0.00 783.40 44.35 6% 5 year licence
Residential Caravan sites- recovery of costs related to
enforcement action
Outwith the Scope 0.00 Full costs
recovery
Outwith the Scope 0.00 Full costs
recovery
Environmental Health Charge for Officer time (per hour) where
appropriate ( out of hours or weekend work incurs a 50%
surcharge on the hourly rate). 105.95
Outwith the Scope 0.00 105.95 112.30 Outwith the Scope 0.00 112.30 6.35 6%
Attestation for export business
112.35
Outwith the Scope 0.00 112.35 119.10 Outwith the Scope 0.00 119.10 6.75 6%
Additional inspections or interventions required as part of
attestation 105.95
Outwith the Scope 0.00 105.95 112.30 Outwith the Scope 0.00 112.30 6.35 6% Officer cost per hour
Private Water Supplies - Visit charge Regulated supply
89.90
Outwith the Scope 0.00 89.90 95.30 Outwith the Scope 0.00 95.30 5.40 6%
Private Water Supplies -Single visit to regulated supply with
multiple commercial properties
89.90
Outwith the Scope 0.00 89.90 95.30 Outwith the Scope 0.00 95.30 5.40 6% If more than one property on supply to be
sampled, additional £11.95 per property
applies as per line below.
Private Water Supplies - multiple commercial properties
charge per additional property above 11.25
Outwith the Scope 0.00 11.25 11.95 Outwith the Scope 0.00 11.95 0.70 6% Charge of £11.95 for additional commercial
property sampled.
Private Water Supplies -Regulated :Analytical parameter cost
0.00
Outwith the Scope 0.00 0.00 0.00 Outwith the Scope 0.00 0.00 0.00 0% At cost
Private Water Supplies -Zonal charge per regulated supply 16.85 Outwith the Scope 0.00 16.85 17.85 Outwith the Scope 0.00 17.85 1.00 6% Analytical costs divided by number of
regulated supplies as of 1st January in
calendar year
Private water supply-Regulated supply:  Initial Risk
assessment visit and report (up to 1 hour on site)
STATUTORY
CHARGE
132.50 Outwith the Scope 0.00 132.50 132.50 Outwith the Scope 0.00 132.50 0.00 0%
Private water supply - Regulated Supply: Programmed/review
risk assessment visit and report (up to 1 hour on site)
STATUTORY
CHARGE
125.00 Outwith the Scope 0.00 125.00 125.00 Outwith the Scope 0.00 125.00 0.00 0%
Private water supply - Regulated risk assessments  (cost per
additional hour or part thereof)
STATUTORY
CHARGE
50.00 Outwith the Scope 0.00 50.00 50.00 Outwith the Scope 0.00 50.00 0.00 0% £50 per additional hour
Private Water Supplies: Regulated supplies: desktop review of
risk assessment
STATUTORY
CHARGE
50.00 Outwith the Scope 0.00 50.00 50.00 Outwith the Scope 0.00 50.00 0.00 0%
Private Water Supplies - Visit charge Type B STATUTORY
CHARGE
70.00 Outwith the Scope 0.00 70.00 70.00 Outwith the Scope 0.00 70.00 0.00 0% Charge capped at £70.
Private Water Supplies - Type B - Monitoring & analytical cost STATUTORY
CHARGE
118.00 Outwith the Scope 0.00 118.00 118.00 Outwith the Scope 0.00 118.00 0.00 0% Charge capped at £118.
Private Water Supplies - Type B - request sample and
analytical cost
STATUTORY
CHARGE
145.00 Outwith the Scope 0.00 145.00 145.00 Outwith the Scope 0.00 145.00 0.00 0% Charge capped at £145.
Private water supply- Initial risk assessment visit (TypeB) and
report
STATUTORY
CHARGE
120.00 Outwith the Scope 0.00 120.00 120.00 Outwith the Scope 0.00 120.00 0.00 0% Capped
Private waters (Regulated and Type B)  - Other Parameters
may be sampled if there is a specific need.  Those charges
will directly reflect those passed to us by the testing laboratory
At Cost 0.00 Outwith the Scope 0.00 0.00 0.00 Outwith the Scope 0.00 0.00 0.00 0% At Cost
Private Landlord Registration - principal fee for registration as
landlord
STATUTORY
CHARGE
80.00 Outwith the Scope 0.00 80.00 80.00 Outwith the Scope 0.00 80.00 0.00 0%
Private Landlord Registration - property fee per property STATUTORY
CHARGE
18.00 Outwith the Scope 0.00 18.00 18.00 Outwith the Scope 0.00 18.00 0.00 0%
Private Landlord Registration- late application fee STATUTORY
CHARGE
160.00 Outwith the Scope 0.00 160.00 160.00 Outwith the Scope 0.00 160.00 0.00 0%
Short-term let licensing - home letting/home sharing
accommodating to 4 guests
253.90 Outwith the Scope 0.00 253.90 269.15 Outwith the Scope 0.00 269.15 15.25 6% Tri-Annual Licence
Short-term let licensing - home letting/home sharing
accommodating 5-8 guests
355.05 Outwith the Scope 0.00 355.05 376.35 Outwith the Scope 0.00 376.35 21.30 6% Tri-Annual Licence
Scottish Government prescribe these charges
for Local Authorities to apply
Planning, Environ Hlth & Hous Page 13
Page 94

Page 95

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2024-25 Increase2025-26
Short-term let licensing - home letting/home sharing
accommodating 9 -12 guests
558.40 Outwith the Scope 0.00 558.40 591.90 Outwith the Scope 0.00 591.90 33.50 6% Tri-Annual Licence
Short-term let licensing - home letting/home sharing
accommodating 13-20 guests
711.25 Outwith the Scope 0.00 711.25 753.90 Outwith the Scope 0.00 753.90 42.65 6% Tri-Annual Licence
Short-term let licensing - home letting/home sharing
accommodating 21 and over guests
914.60 Outwith the Scope 0.00 914.60 969.50 Outwith the Scope 0.00 969.50 54.90 6% Tri-Annual Licence
Short-term let licensing - secondary letting accommodating up
to 4 guests
355.05 Outwith the Scope 0.00 355.05 376.35 Outwith the Scope 0.00 376.35 21.30 6% Tri-Annual Licence
Short-term let licensing - secondary letting accommodating
accommodating 5-8 guests
507.85 Outwith the Scope 0.00 507.85 538.30 Outwith the Scope 0.00 538.30 30.45 6% Tri-Annual Licence
Short-term let licensing - secondary letting accommodating 9 -
12 guests
761.80 Outwith the Scope 0.00 761.80 807.50 Outwith the Scope 0.00 807.50 45.70 6% Tri-Annual Licence
Short-term let licensing - secondary letting accommodating 13-
20 guests
1,015.75 Outwith the Scope 0.00 1,015.75 1,076.70 Outwith the Scope 0.00 1,076.70 60.95 6% Tri-Annual Licence
Short-term let licensing - secondary letting accommodating 21
and over guests
1,269.65 Outwith the Scope 0.00 1,269.65 1,345.85 Outwith the Scope 0.00 1,345.85 76.20 6% Tri-Annual Licence
Short-term let licensing- Variation in Licence/change in
circumstances
86.50 Outwith the Scope 0.00 86.50 91.70 Outwith the Scope 0.00 91.70 5.20 6%
Short-term let licensing- Certified copy of licence/duplicate
licence
46.05 Outwith the Scope 0.00 46.05 48.80 Outwith the Scope 0.00 48.80 2.75 6%
Short-term let licensing - Enforcement charge (Hourly rate) 105.95 Outwith the Scope 0.00 105.95 112.30 Outwith the Scope 0.00 112.30 6.35 6%
Short-term let Licensing:  Confirmation of a provisional STL
licence application
200.00 Outwith the Scope 0.00 200.00 212.00 Outwith the Scope 0.00 212.00 12.00 6%
Short-term let Licensing: Application to extend provisional
short-term let licence
86.50 Outwith the Scope 0.00 86.50 91.70 Outwith the Scope 0.00 91.70 5.20 6%
Short-term let Licensing: Transfer of a licence
86.50 Outwith the Scope 0.00 86.50 91.70 Outwith the Scope 0.00 91.70 5.20 6%
Short-term let licensing: Application for provisional licence -
home letting/home sharing accommodating to 4 guests
39.90 Outwith the Scope 0.00 39.90 42.30 Outwith the Scope 0.00 42.30 2.40 6%
Short-term let licensing: Application for provisional licence -
home letting/home sharing accommodating 5-8 guests
135.05 Outwith the Scope 0.00 135.05 143.15 Outwith the Scope 0.00 143.15 8.10 6%
Short-term let licensing  Application for provisional licence -
home letting/home sharing accommodating 9 -12 guests
358.40 Outwith the Scope 0.00 358.40 379.90 Outwith the Scope 0.00 379.90 21.50 6%
Short-term let licensing: Application for provisional licence -
home letting/home sharing accommodating 13-20 guests
511.25 Outwith the Scope 0.00 511.25 541.90 Outwith the Scope 0.00 541.90 30.65 6%
Short-term let licensing: Application for provisional licence-
home letting/home sharing accommodating 21 and over
guests
714.60 Outwith the Scope 0.00 714.60 757.50 Outwith the Scope 0.00 757.50 42.90 6%
Short-term let licensing : Application for provisional licence-
secondary letting accommodating up to 4 guests
155.05 Outwith the Scope 0.00 155.05 164.35 Outwith the Scope 0.00 164.35 9.30 6%
Revision of STL Policy and introduction of
these new fees will be considered at PPSL on
18/12/24 and Council on 20/12/24. These will
take effect from the date approved and for the
6% inflationary increase for 25/26
The provisional licence router is for premises
which are under construction, and on
completion, they can make application that the
licence can be confirmed, for a further fee
Planning, Environ Hlth & Hous Page 14
Page 95

Page 96

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2024-25 Increase2025-26
Short-term let licensing: Application for provisional licence -
secondary letting accommodating  5-8 guests
307.85 Outwith the Scope 0.00 307.85 326.30 Outwith the Scope 0.00 326.30 18.45 6%
Short-term let licensing: Application for provisional licence -
secondary letting accommodating 9 -12 guests
561.80 Outwith the Scope 0.00 561.80 595.50 Outwith the Scope 0.00 595.50 33.70 6%
Short-term let licensing: Application for provisional licence -
secondary letting accommodating 13-20 guests
815.75 Outwith the Scope 0.00 815.75 864.70 Outwith the Scope 0.00 864.70 48.95 6%
Short-term let licensing: Application for provisional licence -
secondary letting accommodating 21 and over guests
1,069.65 Outwith the Scope 0.00 1,069.65 1,133.85 Outwith the Scope 0.00 1,133.85 64.20 6%
Environmental Health Section 50 Licence Certificate 166.00 Outwith the Scope 0.00 166.00 176.00 Outwith the Scope 0.00 176.00 10.00 6%
This is a new fee to recover the costs from
business, in considering and determining
applications for Section 50 Environmental
Health certificates. A similar fee is charged by
development control and building standards for
S50 certificates and this provides a consistent
charging structure across these regulatory
services.  Note: a savings option for 25/26
was proposed to introduce this fee
PLANNING SERVICES
Additional administration fee in respect of an Advert required
in terms of Regulation 20 of the Town & Country Planning
(Development Management Procedure) (Scotland)
Regulations 2008
195.83 Standard 39.17 235.00 207.50 Standard 41.50 249.00 14.00 6%
Planning Section 50 Licence Certificate 166.00 Outwith the Scope 0.00 166.00 176.00 Outwith the Scope 0.00 176.00 10.00 6%
Pre Application advice for major planning applications 936.67 Standard 187.33 1,124.00 992.50 Standard 198.50 1,191.00 67.00 6%
Pre Application advice for local planning applications Maximum £899 749.17 Standard 149.83 899.00 794.17 Standard 158.83 953.00 54.00 6%
Pre-Application Initiation & follow up 30min meeting 35.00 Standard 7.00 42.00 37.50 Standard 7.50 45.00 3.00 7% includes 20min prep and 10 mins follow up
Pre-Application Initiation & follow up 1hour meeting 71.67 Standard 14.33 86.00 75.83 Standard 15.17 91.00 5.00 6% includes 40min prep and 20 mins follow up
Pre-Application Initiation & follow up 2hour meeting 108.33 Standard 21.67 130.00 115.00 Standard 23.00 138.00 8.00 6% includes 40min prep and 20 mins follow up
High Hedge complaint 537.00 Outwith the Scope 0.00 537.00 569.00 Outwith the Scope 0.00 569.00 32.00 6% £50 charge if investigated but not classed as a
hedge
S64 submission relating to Householder Development 58.00 Outwith the Scope 0.00 58.00 61.50 Outwith the Scope 0.00 61.50 3.50 6%
S64 submission relating to Non-Householder Local
Development
116.00 Outwith the Scope 0.00 116.00 123.00 Outwith the Scope 0.00 123.00 7.00 6%
S64 submission relating to Major Development 231.00 Outwith the Scope 0.00 231.00 245.00 Outwith the Scope 0.00 245.00 14.00 6% S64 submissions relating to a single
dwelling/plot within a larger Major
Development shall be charged as a Non-
Householder Local Development
Administration Charge for non e-Planning application
submissions - Householder Application
23.00 Outwith the Scope 0.00 23.00 24.50 Outwith the Scope 0.00 24.50 1.50 7% Exemptions to this charge will be applied
where submissions cannot be made through
the ePlanning portal including:
- Pre-application Screening Notice;
- Proposal of Application Notice;
- Applications for modification or discharge of
planning obligations under s75A;
- Applications for marine fish farm
development;
- Applications for a High Hedge Notice;
Revision of STL Policy and introduction of
these new fees will be considered at PPSL on
18/12/24 and Council on 20/12/24. These will
take effect from the date approved and for the
6% inflationary increase for 25/26
The provisional licence router is for premises
which are under construction, and on
completion, they can make application that the
licence can be confirmed, for a further fee
Planning, Environ Hlth & Hous Page 15
Page 96

Page 97

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2024-25 Increase2025-26
Administration Charge for non e-Planning application
submissions - Non-Householder Local Application
58.00 Outwith the Scope 0.00 58.00 61.50 Outwith the Scope 0.00 61.50 3.50 6%
Administration Charge for non e-Planning application
submissions - Major Application
116.00 Outwith the Scope 0.00 116.00 123.00 Outwith the Scope 0.00 123.00 7.00 6%
Property History Search - Copy Document Record Search
where specific planning application reference required is
provided
43.00 Outwith the Scope 0.00 43.00 46.00 Outwith the Scope 0.00 46.00 3.00 7% additional printing charges will be applied for
provision of hardcopy documentation; no fee
for provision of e-copy
Property History Search - Copy Document Record Search
where specific planning application reference is not provided
101.00 Outwith the Scope 0.00 101.00 107.00 Outwith the Scope 0.00 107.00 6.00 6%
Planning Statutory Fees
Fee Guidance Notes - MS Word variant - last
updated 11th December 2024
Surcharge for retrospective planning permission
25% of  planning fee
Outwith the Scope 0.00 25% of  planning fee
Admin Charge for return of invalid application 50.00 Outwith the Scope 0.00 50.00 50.00 Outwith the Scope 0.00 50.00 to help recover the costs for work to attempt to
validate the application
Discharge of planning conditions 110.00 Outwith the Scope 0.00 110.00 110.00 Outwith the Scope 0.00 110.00 to help cover the costs involved with discharge
of conditions
BUILDING STANDARDS 
Property Inspection 418.00 Outwith the Scope 0.00 418.00 443.00 Outwith the Scope 0.00 443.00 25.00 6%
Re - Inspection Fee Property Inspection Applications 208.00 Outwith the Scope 0.00 208.00 220.00 Outwith the Scope 0.00 220.00 12.00 6%
Confirmation of completion Applications 334.00 Outwith the Scope 0.00 334.00 354.00 Outwith the Scope 0.00 354.00 20.00 6%
Re - Inspection Fee Confirmation of Completion Applications 191.00 Outwith the Scope 0.00 191.00 202.00 Outwith the Scope 0.00 202.00 11.00 6%
Confirmation of Exempt class of works 85.00 Outwith the Scope 0.00 85.00 90.00 Outwith the Scope 0.00 90.00 5.00 6%
Building Standards Section 50 Licence Certificate 166.00 Outwith the Scope 0.00 166.00 176.00 Outwith the Scope 0.00 176.00 10.00 6%
Property Enquiries (if Application Number known) 49.00 Outwith the Scope 0.00 49.00 52.00 Outwith the Scope 0.00 52.00 3.00 6%
Property Enquiries (if Application Number not known) 120.00 Outwith the Scope 0.00 120.00 127.00 Outwith the Scope 0.00 127.00 7.00 6%
Building Standards Statutory Fees
Fee  Calculator (ebuildingstandards.scot)
Back-up Gov File - \\abck-fs01\Financial
Services\Accounting and
Budgeting\Corporate Processes\Budget
Preparation\2025-26\Fees and
Charges\Building Warrant Fees 2025-2026.
Letter from Stephen Garvin, Scottish
Government.pdf
HOUSING
Housing - Homeless Temporary Accommodation - Bedsit/1
Bed - per week 57.06 Outwith the Scope 0.00 57.06 57.06 Outwith the Scope 0.00 57.06 0.00 0%
Not subject to inflation - only the service
charge is inflated.
Planning, Environ Hlth & Hous Page 16
Page 97

Page 98

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2024-25 Increase2025-26
Housing - Homeless Temporary Accommodation - 2 Bed
Flat/House - per week 64.62 Outwith the Scope 0.00 64.62 64.62 Outwith the Scope 0.00 64.62 0.00 0%
Housing - Homeless Temporary Accommodation - 3 Bed
Flat/House - per week 71.37 Outwith the Scope 0.00 71.37 71.37 Outwith the Scope 0.00 71.37 0.00 0%
Housing - Homeless Temporary Accommodation - 4 Bed
House - per week 76.67 Outwith the Scope 0.00 76.67 76.67 Outwith the Scope 0.00 76.67 0.00 0%
Housing - Homeless Tenants Service Charge per week 56.55 Outwith the Scope 0.00 56.55 59.95 Outwith the Scope 0.00 59.95 3.40 6%
Not subject to inflation - only the service
charge is inflated.
Planning, Environ Hlth & Hous Page 17
Page 98

Page 99

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
WASTE COLLECTION
Supply of Sacks for Commercial Use (pack of 50) 377.05 Outwith the Scope 0.00 377.05 426.90
Outwith the
Scope 0.00 426.90 49.85 13%
Scottish Government Landfill Tax proposed
increase for 2025-26 of £22.45 per tonne. 
Given the ban on biodegradable municipal
waste to landfill comes into effect on the 1
January 2026 landfill tax will no longer be
incurred. However, residual waste disposal
charges will replace landfill tax charges after
the ban is implemented.
Confidential Sacks - Includes Uplift, Shredding and disposal
Internal Use Only
- Minimum of 8
sacks per order 18.50 Outwith the Scope 0.00 18.50 19.60
Outwith the
Scope 0.00 19.60 1.10 6%
Domestic Use Only 140 Litre Bins 42.10 Outwith the Scope 0.00 42.10 44.65
Outwith the
Scope 0.00 44.65 2.55 6%
Domestic Use Only 240 Litre Bins 42.10 Outwith the Scope 0.00 42.10 44.65
Outwith the
Scope 0.00 44.65 2.55 6%
Commercial Use Only 240 Litre Bins 107.63 Standard 21.53 129.15 114.08 Standard 22.82 136.90 7.75 6%
Commercial Use Only 360 Litre Bins 156.58 Standard 31.32 187.90 165.96 Standard 33.19 199.15 11.25 6%
Commercial Use Only 660 Litre Bins 394.88 Standard 78.98 473.85 418.58 Standard 83.72 502.30 28.45 6%
Commercial Use Only 1100 Litre Bins 480.96 Standard 96.19 577.15 509.83 Standard 101.97 611.80 34.65 6%
Commercial Use Only 1280 Litre Bins 495.33 Standard 99.07 594.40 525.04 Standard 105.01 630.05 35.65 6%
Householder Special Refuse Collection
Minimum Charge
covers work of two
men and vehicle
up to ten minutes. 80.90 Outwith the Scope 0.00 80.90 85.75
Outwith the
Scope 0.00 85.75 4.85 6%
Householder Special Refuse Collection Extra Charge
Charged per 10
minutes over
minimum charge 50.35 Outwith the Scope 0.00 50.35 53.35
Outwith the
Scope 0.00 53.35 3.00 6%
Commercial Special Uplift (Industrial Waste)
(Charge Per Hour -
Minimum Charge
1 hour) 177.96 Standard 35.59 213.55 188.63 Standard 37.73 226.35 12.80 6%
Commercial Special Uplift (Non-industrial Waste)
(Charge Per Hour -
Minimum Charge
1 hour) - Housing
Associations
should be
charged at this
rate. 177.95 Outwith the Scope 0.00 177.95 188.65
Outwith the
Scope 0.00 188.65 10.70 6%
Provided not Industrial waste as per
Environmental Protection Act 1990.
For commercial fridge/freezer disposal,
contact the Waste Team for advice.
Return of Supermarket trolleys (each) 49.71 Standard 9.94 59.65 52.71 Standard 10.54 63.25 3.60 6%
COMMERCIAL REFUSE
Wheeled Bins - 140/240 ltr
Based on 1 uplift
per week 449.70 Outwith the Scope 0.00 449.70 509.15
Outwith the
Scope 0.00 509.15 59.45 13%
Minimum Charge 2025/26 - £509.15
Equivalent to the 140/240 litre bin charge for
collection and landfill tax uplifted once a
week.
Wheeled Bins - 340 ltr
Based on 1 uplift
per week 636.99 Outwith the Scope 0.00 636.99 721.20
Outwith the
Scope 0.00 721.20 84.21 13%
Wheeled Bins - 660 ltr
Based on 1 uplift
per week 1,222.24 Outwith the Scope 0.00 1,222.24 1,383.81
Outwith the
Scope 0.00 1,383.81 161.57 13%
Wheeled Bins - 800 ltr
Based on 1 uplift
per week 1,481.47 Outwith the Scope 0.00 1,481.47 1,677.32
Outwith the
Scope 0.00 1,677.32 195.85 13%
2024-25 Increase2025-26
For premises whereby a less than weekly
mixed waste service is available only, the
minimum charge will be adjusted
accordingly.
Agreements are issued Annually to  all
commercial/front end loader customers. 
Payments are either made in advance or by
direct debit.
Front End Loader service provided by
Renewi   Some bins still responsibility of
Council dependant on location and
recognised use by public.  Any charge by
Renewi above this level to be charged at
cost + 2% to customers.
Waste Management Page 18
Page 99

Page 100

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2024-25 Increase2025-26
Wheeled Bins - 1100 ltr
Based on 1 uplift
per week 2,036.18 Outwith the Scope 0.00 2,036.18 2,305.36
Outwith the
Scope 0.00 2,305.36 269.18 13%
Wheeled Bins - 1280 ltr
Based on 1 uplift
per week 2,369.30 Outwith the Scope 0.00 2,369.30 2,682.52
Outwith the
Scope 0.00 2,682.52 313.22 13%
Loads - Bands 1-5 1,093.10 Outwith the Scope 0.00 1,093.10 1,237.60
Outwith the
Scope 0.00 1,237.60 144.50 13%
Loads - Bands 6-10 2,463.11 Outwith the Scope 0.00 2,463.11 2,788.74
Outwith the
Scope 0.00 2,788.74 325.63 13%
Front End Loader Service - Uplifted twice weekly by Renewi Per Cubic Yard 2,393.41 Outwith the Scope 0.00 2,393.41 2,709.82
Outwith the
Scope 0.00 2,709.82 316.41 13%
Front End Loader Service - Uplifted twice weekly by Renewi Per Cubic Metre 2,825.48 Outwith the Scope 0.00 2,825.48 3,199.02
Outwith the
Scope 0.00 3,199.02 373.54 13%
Pull Out Charge - Commercial only 119.21 Outwith the Scope 0.00 119.21 126.36
Outwith the
Scope 0.00 126.36 7.15 6% This charge is per bin.
COMMERCIAL REFUSE (private waste contractor's with
Council acting as sub-contractor)
Supply of Sacks for Commercial Use (pack of 50) 377.06 Standard 75.41 452.47 426.91 Standard 85.38 512.29 59.82 13%
Minimum Charge 2025/26 - £610.98
Equivalent to the 140/240 litre bin charge for
collection and landfill tax uplifted once a
week.
Wheeled Bins - 140/240 ltr
Based on 1 uplift
per week 449.70 Standard 89.94 539.64 509.15 Standard 101.83 610.98 71.34 13%
Wheeled Bins - 340 ltr
Based on 1 uplift
per week 636.99 Standard 127.40 764.39 721.20 Standard 144.24 865.45 101.05 13%
Wheeled Bins - 660 ltr
Based on 1 uplift
per week 1,222.23 Standard 244.45 1,466.68 1,383.81 Standard 276.76 1,660.58 193.90 13%
Wheeled Bins - 800 ltr
Based on 1 uplift
per week 1,481.47 Standard 296.29 1,777.77 1,677.32 Standard 335.46 2,012.79 235.02 13%
Wheeled Bins - 1100 ltr
Based on 1 uplift
per week 2,036.18 Standard 407.24 2,443.41 2,305.36 Standard 461.07 2,766.43 323.02 13%
Wheeled Bins - 1280 ltr
Based on 1 uplift
per week 2,369.30 Standard 473.86 2,843.16 2,682.52 Standard 536.50 3,219.02 375.87 13%
Loads - Bands 1-5 1,093.09 Standard 218.62 1,311.71 1,237.60 Standard 247.52 1,485.12 173.41 13%
Loads - Bands 6-10 2,463.11 Standard 492.62 2,955.74 2,788.74 Standard 557.75 3,346.49 390.75 13%
Front End Loader Service - Uplifted twice weekly by Renewi Per Cubic Yard 2,393.41 Standard 478.68 2,872.09 2,709.82 Standard 541.96 3,251.79 379.69 13%
Front End Loader Service - Uplifted twice weekly by Renewi Per Cubic Metre 2,825.49 Standard 565.10 3,390.58 3,199.02 Standard 639.80 3,838.82 448.24 13%
Pull Out Charge - Commercial only 119.21 Standard 23.84 143.05 126.36 Standard 25.27 151.63 8.58 6% This charge is per bin.
RECYCLING CHARGES
Office Paper - Large Bag / 1 x week 178.37 Outwith the Scope 0.00 178.37 189.07
Outwith the
Scope 0.00 189.07 10.70 6%
Paper, Cardboard, Plastic and Cans - 240 litre Bins and
Minimum Charge for Year 118.28 Outwith the Scope 0.00 118.28 125.37
Outwith the
Scope 0.00 125.37 7.09 6%
Paper, Cardboard, Plastic and Cans - 340 litre Bin 166.71 Outwith the Scope 0.00 166.71 176.71
Outwith the
Scope 0.00 176.71 10.00 6%
Paper, Cardboard, Plastic and Cans - 660 litre Bin 318.93 Outwith the Scope 0.00 318.93 338.07
Outwith the
Scope 0.00 338.07 19.15 6%
Paper, Cardboard, Plastic and Cans - 800 litre Bin 386.62 Outwith the Scope 0.00 386.62 409.81
Outwith the
Scope 0.00 409.81 23.20 6%
Paper, Cardboard, Plastic and Cans - 1100/1280 litre Bin 530.39 Outwith the Scope 0.00 530.39 562.22
Outwith the
Scope 0.00 562.22 31.83 6%
For premises whereby a less than weekly
mixed waste service is available only, the
minimum charge will be adjusted
accordingly.
Agreements are issued Annually to  all
commercial/front end loader customers. 
Payments are either made in advance or by
direct debit.
Front End Loader service provided by
Renewi   Some bins still responsibility of
Council dependant on location and
recognised use by public.  Any charge by
Renewi above this level to be charged at
cost + 2% to customers.
For premises whereby a less than weekly
mixed waste service is available only, the
minimum charge will be adjusted
accordingly.
Agreements are issued Annually to  all
commercial/front end loader customers. 
Payments are either made in advance or by
direct debit.
Front End Loader service provided by
Renewi   Some bins still responsibility of
Council dependant on location and
recognised use by public.  Any charge by
Renewi above this level to be charged at
cost + 2% to customers.
Charges for recycling collections or
treatment should in general be levied on the
commercial sector on the same basis as
normal refuse collection or disposal, but with
the benefit of no landfill tax payment being
applied to the charge.
At Waste Disposal Sites and Civic
Amenity/Recycling Sites, use by the
commercial sector (if permitted by the 
license conditions) should only be allowed in
return for the payment of the appropriate
rate, equivalent to the disposal charge
excluding landfill tax. A pre-paid punch card
system is available. There are some
exceptions to this e.g. commercial wood
from Council operated island waste disposal
sites, where high haulage costs are incurred
and an appropriate charge is levied to cover
this.
Fortnightly Charge
- Weekly services
shall be charged
accordingly at
fortnightly rate x 2
Waste Management Page 19
Page 100

Page 101

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2024-25 Increase2025-26
Commercial Sacks for Recyclable Waste
Charge Per Sack.
Service available
in Kintyre and only
sold and used
when no space for
a blue bin. 1.77 Outwith the Scope 0.00 1.77 1.88
Outwith the
Scope 0.00 1.88 0.11 6%
Recyclable Waste Brought to Civic Amenity/Recycling
Facilities
Purchase of
Punch Card -
Price per card 51.77 Outwith the Scope 0.00 51.77 54.87
Outwith the
Scope 0.00 54.87 3.11 6%
Cooking Oil Collection (per 20/24ltr container)
Service available
in Mull, Iona,
Tiree, Islay and
Jura 4.32 Outwith the Scope 0.00 4.32 4.58
Outwith the
Scope 0.00 4.58 0.26 6%
Commercial Wood Delivered by Contractors
Island waste
disposal sites on
Mull, Islay and
Tiree 131.06 Outwith the Scope 0.00 131.06 138.92
Outwith the
Scope 0.00 138.92 7.86 6%
Segregated Glass Collection - 240 litre bin 1 x weekly 74.44 Outwith the Scope 0.00 74.44 78.90
Outwith the
Scope 0.00 78.90 4.47 6%
Segregated Glass Collection - 330/360 litre bin 1 x weekly 102.55 Outwith the Scope 0.00 102.55 108.70
Outwith the
Scope 0.00 108.70 6.15 6%
Segregated Glass Collection - 660 litre bin 1 x weekly 201.77 Outwith the Scope 0.00 201.77 213.88
Outwith the
Scope 0.00 213.88 12.12 6%
Segregated Glass Collection - 1100/1280 litre bin 1 x weekly 304.19 Outwith the Scope 0.00 304.19 322.44
Outwith the
Scope 0.00 322.44 18.25 6%
Mixed Glass Collection - 240 litre bin and Minimum Charge 112.77 Outwith the Scope 0.00 112.77 119.52
Outwith the
Scope 0.00 119.52 6.75 6%
Mixed Glass Collection - 660 litre bin 304.19 Outwith the Scope 0.00 304.19 322.44
Outwith the
Scope 0.00 322.44 18.25 6%
Mixed Glass Collection - 1100 litre bin 456.27 Outwith the Scope 0.00 456.27 483.65
Outwith the
Scope 0.00 483.65 27.38 6%
Commercial Food Waste Composting Service - Weekly
Service of 140ltr Wheeled Bin
Service only
available in
Lomond - Bin and
160 Bags per
annum supplied by
Council 194.68 Outwith the Scope 0.00 194.68 206.36
Outwith the
Scope 0.00 206.36 11.68 6%
Commercial Food Waste Composting Service - Weekly
Service of 240ltr Wheeled Bin
Service only
available in
Lomond - Bin and
160 Bags per
annum supplied by
Council 333.67 Outwith the Scope 0.00 333.67 353.70
Outwith the
Scope 0.00 353.70 20.03 6%
Commercial Food Waste Composting Service - Weekly
Service of 500ltr Wheeled Bin
Service only
available in
Lomond - Bin and
570 Bags per
annum supplied by
Council 695.85 Outwith the Scope 0.00 695.85 737.60
Outwith the
Scope 0.00 737.60 41.75 6%
RECYCLING CHARGES (private waste contractor's with
Council acting as sub-contractor)
Charges for recycling collections or
treatment should in general be levied on the
commercial sector on the same basis as
normal refuse collection or disposal, but with
the benefit of no landfill tax payment being
applied to the charge.
At Waste Disposal Sites and Civic
Amenity/Recycling Sites, use by the
commercial sector (if permitted by the 
license conditions) should only be allowed in
return for the payment of the appropriate
rate, equivalent to the disposal charge
excluding landfill tax. A pre-paid punch card
system is available. There are some
exceptions to this e.g. commercial wood
from Council operated island waste disposal
sites, where high haulage costs are incurred
and an appropriate charge is levied to cover
this.
Minimum Charge
same as for Mixed
Glass
Fortnightly Charge
for Isles of Mull,
Iona, Tiree and
Islay
Waste Management Page 20
Page 101

Page 102

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2024-25 Increase2025-26
Office Paper - Large Bag / 1 x week 178.37 Standard 35.67 214.04 189.07 Standard 37.81 226.88 12.84 6%
Paper, Cardboard, Plastic and Cans - 240 litre Bins and
Minimum Charge for Year 118.28 Standard 23.66 141.93 125.37 Standard 25.07 150.45 8.52 6%
Paper, Cardboard, Plastic and Cans - 340 litre Bin 166.71 Standard 33.34 200.04 176.71 Standard 35.34 212.05 12.00 6%
Paper, Cardboard, Plastic and Cans - 660 litre Bin 318.93 Standard 63.79 382.72 338.07 Standard 67.61 405.68 22.96 6%
Paper, Cardboard, Plastic and Cans - 800 litre Bin 386.62 Standard 77.32 463.94 409.81 Standard 81.96 491.78 27.84 6%
Paper, Cardboard, Plastic and Cans - 1100/1280 litre Bin 530.39 Standard 106.08 636.47 562.22 Standard 112.44 674.66 38.19 6%
Commercial Sacks for Recyclable Waste
Charge Per Sack.
Service available
in Kintyre and only
sold and used
when no space for
a blue bin. 1.77 Standard 0.35 2.13 1.88 Standard 0.38 2.25 0.13 6%
Segregated Glass Collection - 240 litre bin 1 x weekly 74.44 Standard 14.89 89.32 78.90 Standard 15.78 94.68 5.36 6%
Segregated Glass Collection - 330/360 litre bin 1 x weekly 102.55 Standard 20.51 123.06 108.70 Standard 21.74 130.44 7.38 6%
Segregated Glass Collection - 660 litre bin 1 x weekly 201.77 Standard 40.35 242.13 213.88 Standard 42.78 256.65 14.53 6%
Segregated Glass Collection - 1100/1280 litre bin 1 x weekly 304.19 Standard 60.84 365.03 322.44 Standard 64.49 386.93 21.90 6%
Mixed Glass Collection - 240 litre bin and Minimum Charge 112.77 Standard 22.55 135.31 119.52 Standard 23.90 143.42 8.12 6%
Mixed Glass Collection - 660 litre bin 304.19 Standard 60.84 365.03 322.44 Standard 64.49 386.93 21.90 6%
Mixed Glass Collection - 1100 litre bin 456.27 Standard 91.25 547.53 483.65 Standard 96.73 580.38 32.85 6%
Commercial Food Waste Composting Service - Weekly
Service of 140ltr Wheeled Bin
Service only
available in
Lomond - Bin and
160 Bags per
annum supplied by
Council 194.68 Standard 38.94 233.62 206.36 Standard 41.27 247.64 14.02 6%
Commercial Food Waste Composting Service - Weekly
Service of 240ltr Wheeled Bin
Service only
available in
Lomond - Bin and
160 Bags per
annum supplied by
Council 333.67 Standard 66.74 400.41 353.70 Standard 70.74 424.44 24.02 6%
Commercial Food Waste Composting Service - Weekly
Service of 500ltr Wheeled Bin
Service only
available in
Lomond - Bin and
570 Bags per
annum supplied by
Council 695.85 Standard 139.17 835.01 737.60 Standard 147.52 885.11 50.10 6%
SKIPS
Fortnightly Charge
- Weekly services
shall be charged
accordingly at
fortnightly rate x 2
Minimum Charge
same as for Mixed
Glass
Fortnightly Charge
for Isles of Mull,
Iona, Tiree and
Islay
Waste Management Page 21
Page 102

Page 103

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2024-25 Increase2025-26
Hire (for 24 hours)
Any Ferry
Journeys will be
recharged at cost. 6.83 Standard 1.37 8.20 7.25 Standard 1.45 8.70 0.50 6%
Charge for skip hire if not part of
commercial waste collection contract.
Commercial - Service of Skip - Up to 10 miles travel, one way
from disposal point
Any Ferry
Journeys will be
recharged at cost. 89.60 Outwith the Scope 0.00 89.60 95.00
Outwith the
Scope 0.00 95.00 5.40 6%
Commercial - Service of Skip - Up to 20 miles travel, one way
from disposal point
Any Ferry
Journeys will be
recharged at cost. 113.80 Outwith the Scope 0.00 113.80 120.65
Outwith the
Scope 0.00 120.65 6.85 6%
Commercial - Service of Skip - Over 20 miles travel, one way
from disposal point
Any Ferry
Journeys will be
recharged at cost. 140.80 Outwith the Scope 0.00 140.80 149.25
Outwith the
Scope 0.00 149.25 8.45 6%
Commercial - Tipping Charge per Service, including Landfill
Tax (Active)
Tiree Only - See
notes 382.85 Outwith the Scope 0.00 382.85 449.55
Outwith the
Scope 0.00 449.55 66.70 17%
Commercial - Tipping Charge per Service, including Landfill
Tax (Inactive)
Tiree Only - See
notes 0.00 Outwith the Scope 0.00 0.00 0.00
Outwith the
Scope 0.00 0.00 0.00 0%
HOUSEHOLDER SCRAP CAR REMOVAL AND DISPOSAL
SERVICE (Service not available to Commercial
Customers they should make their own arrangements
with appropriate vehicle dismantlers)
Scrap Car Deposit Voucher - per car
The voucher
service is not
available in
Helensburgh and
Lomond, where
advice can be
sought from your
local area office.  99.50 Standard 19.90 119.40 105.46 Standard 21.09 126.55 7.15 6%
Householder must pay fee and show
registration document as proof of ownership
before voucher can be issued.  Car must be
taken to appropriate Council or Renewi
disposal site by Householder.
Removal and disposal from householders 163.54 Standard 32.71 196.25 266.67 Standard 53.33 320.00 123.75 63%
Householders should be advised of national
takeback schemes i.e. Cartakeback and
Autogreen, before proceeding with removal
request and payment. Council's contractor
costs have increased for the removal/uplift
and disperal and also storage per day,
increase to ££320.00.
Landfill tax on inactive waste at Council
landfill sites on Mull, Islay and Tiree may be
charged.  This will depend on the type of
inactive waste and it’s use on the landfill
site.  A contractor with such waste should
contact the Council to discuss this prior to
disposal of inactive waste.
Tipping Charges - Tiree, no weighbridge,
charges based on assumed weights based
on vehicle size.
Tipping Charges - Islay and Mull - charge
based on weighbridge - see Waste Disposal
Charges.
Waste Management Page 22
Page 103

Page 104

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2024-25 Increase2025-26
Removal of abandoned car where owner can be traced -
Statutory Fee 300.00 Outwith the Scope 0.00 300.00 300.00
Outwith the
Scope 0.00 300.00 0.00 0%
Charge set by Legislation. If car has to be
stored due to its condition (e.g. still taxed) in
Council Depot an additional  £20.60 per
storage charge per day should be added.
Removal of car by arrangement on private, or other public
sector ground, where the last registered keeper cannot be
traced. The Executive Director of the Development and
Infrastructure Department shall have the discretion to require
a payment in advance from the landowner 196.25 Outwith the Scope 0.00 196.25 320.00
Outwith the
Scope 0.00 320.00 123.75 63%
A 24 hour notice on the car must be served
prior to removal and disposal.Council's
contractor costs have increased for the
removal/uplift and disperal and also storage
per day, increase to ££320.00.
WASTE DISPOSAL
Ordinary Waste - Landfill Tax Element of Charges per tonne
(Fee set by Scottish Government)
Charge includes
Landfill Tax 103.70 Outwith the Scope 0.00 103.70 126.15
Outwith the
Scope 0.00 126.15 22.45 22%
Ordinary Waste - Waste Disposal Cost per tonne
Charge includes
Landfill Tax 141.80 Outwith the Scope 0.00 141.80 166.50
Outwith the
Scope 0.00 166.50 24.70 17%
Inactive Waste - Landfill Tax Element of Charges per tonne
Charge includes
Landfill Tax 3.30 Outwith the Scope 0.00 3.30 4.05
Outwith the
Scope 0.00 4.05 0.75 23%
Inactive Waste - Waste Disposal Cost per tonne
Charge includes
Landfill Tax 0.00 Outwith the Scope 0.00 0.00 0.00
Outwith the
Scope 0.00 0.00 0.00 0%
Assumed Loads per vehicle type - Small Van/pick up (Escort
size) 0.4 tonnes 58.15 Outwith the Scope 0.00 58.15 68.15
Outwith the
Scope 0.00 68.15 10.00 17%
Assumed Loads per vehicle type - Medium Van/pick up
(Transit size) 0.8 tonnes 116.00 Outwith the Scope 0.00 116.00 135.95
Outwith the
Scope 0.00 135.95 19.95 17%
Assumed Loads per vehicle type - Large Van/pick up (twin
wheeled) 1.2 tonnes 173.95 Outwith the Scope 0.00 173.95 203.85
Outwith the
Scope 0.00 203.85 29.90 17%
Assumed Loads per vehicle type - Tipper/Large Box Van
(over 3.5 tonnes and less than 7.5 tonnes) 3 tonnes 435.00 Outwith the Scope 0.00 435.00 509.80
Outwith the
Scope 0.00 509.80 74.80 17%
Waste Management Page 23
Page 104

Page 105

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
PUBLIC CONVENIENCES
Entrance Fee (where Public Convenience entry system fitted) 0.50 Outwith the Scope 0.00 0.50 0.50
Outwith the
Scope 0.00 0.50 0.00 0%
Radar Keys 4.90 Outwith the Scope 0.00 4.90 5.20
Outwith the
Scope 0.00 5.20 0.30 6%
Purchased at Area Offices.
PEST CONTROL
Eradication of rats and mice, this covers all individual dwelling
premises either private or rented from Housing Associations,
Social Landlords, Private Landlords or Commercial premises. 172.00 Standard 34.40 206.40 182.33 Standard 36.47 218.80 12.40 6%
Eradication of rats and mice. Charge for third visit (if required)
for individual dwelling premises either private or rented from
Housing Associations, Social Landlords, Private Landlords or
Commercial premises. 86.00 Standard 17.20 103.20 91.17 Standard 18.23 109.40 6.20 6%
Eradication of rats and mice for Council owned properties.  172.00 Outwith the Scope 0.00 172.00 182.30
Outwith the
Scope 0.00 182.30 10.30 6%
Eradication of rate and mice. Charge for third visit
(if required) Council owned properties. 86.00 Outwith the Scope 0.00 86.00 91.15
Outwith the
Scope 0.00 91.15 5.15 6%
Eradication of wasps and ants, this covers all individual 
dwelling premises either private or rented from Housing
Associations, Social Landlords, Private Landlords or
Commercial premises. 132.00 Standard 26.40 158.40 139.92 Standard 27.98 167.90 9.50 6%
Eradication of wasps and ants for Council owned properties.  132.00 Outwith the Scope 0.00 132.00 139.90
Outwith the
Scope 0.00 139.90 7.90 6%
Eradication of fleas and bed bugs, this covers all individual
dwelling premises either private or rented from Housing
Associations, Social Landlords, Private Landlords or
Commercial premises.
Minimum fee listed
only 646.35 Standard 129.27 775.62 685.15 Standard 137.03 822.18 46.56 6%
Eradication of fleas and bed bugs for Council owned
properties.
Minimum fee listed
only 646.35 Outwith the Scope 0.00 646.35 685.15
Outwith the
Scope 0.00 685.15 38.80 6%
Eradication of moles for Council owned land only 646.35 0.00 646.35 685.15 0.00 685.15 38.80 6%
Works to be carried out only on Council
owned land due to nature of control.
Non refundable survey charge 55.38 Standard 11.08 66.45 58.71 Standard 11.74 70.45 4.00 6%
If works progress to a contract/work
agreement, the survey fee can be
discounted from the costs of the works.
DOG FEES
Standard Fee 29.80 Outwith the Scope 0.00 29.80 31.60
Outwith the
Scope 0.00 31.60 1.80 6%
Boarding fee 21.00 Outwith the Scope 0.00 21.00 22.25
Outwith the
Scope 0.00 22.25 1.25 6%
Kennel Inoculation Fee 49.46 Standard 9.89 59.35 52.42 Standard 10.48 62.90 3.55 6%
Dog microchipping 43.58 Standard 8.72 52.30 46.21 Standard 9.24 55.45 3.15 6%
Room Hire - Hermitage Park Pavilion
Payment must be made in advance.  The
charge includes 2 visits.  Further charges 
during the initial treatment may be
necessary where eradication requires more
that 2 visits.  Advice on the total charge for
eradication can be provided by officers.
Payment must be made in advance. The
charge includes 1 visit. Further charges may
be necessary where eradication requires
additional visits. Advice on the total charge
for eradication can be provided by officers
during the initial treatment.
The cost of this service would be agreed
with the customer at the time of the survey.
Payment in advance. Proof of identity must
be shown at the Area Office when payment
is made.  A receipt will be issued to allow
the owner to collect their dog from the
kennels.  In order for Kennel Operators to
accept dogs there is a requirement that they
are inoculated.
First 24 hour period, statutory charge
applied plus boarding fee. The boarding fee
only, will be applied for each subsequent
day the dog is in boardings.
Dog microchipping is required by law since
April 2016.  Dogs (when not already
microchipped) will be microchipped before
returning to the owner.
2024-25 Increase2025-26
Amenities Page 24
Page 105

Page 106

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2024-25 Increase2025-26
Hermitage Park Pavilion Community Room 
(Concession rate per hour Monday to Friday) 21.33 Standard 4.27 25.60 21.33 Standard 4.27 25.60 0.00 0%
Hermitage Park Pavilion Community Room
(Concession rate per hour Saturday and Sunday) 27.33 Standard 5.47 32.80 27.33 Standard 5.47 32.80 0.00 0%
Hermitage Park Pavilion Community Room
(Commercial rate per hour Monday to Friday) 26.21 Standard 5.24 31.45 26.21 Standard 5.24 31.45 0.00 0%
Hermitage Park Pavilion Community Room
(Commercial rate per hour Saturday and Sunday) 33.46 Standard 6.69 40.15 33.46 Standard 6.69 40.15 0.00 0%
PLAYING FIELDS
18 and over 85.38 Standard 17.08 102.45 90.50 Standard 18.10 108.60 6.15 6%
Under 18's 42.67 Standard 8.53 51.20 45.21 Standard 9.04 54.25 3.05 6%
18 and over 42.67 Standard 8.53 51.20 45.21 Standard 9.04 54.25 3.05 6%
Under 18's 21.33 Standard 4.27 25.60 22.63 Standard 4.53 27.15 1.55 6%
Hire of Pitch for Training (2 hours) All ages 21.33 Standard 4.27 25.60 22.63 Standard 4.53 27.15 1.55 6%
18 and over 25.88 Standard 5.18 31.05 27.42 Standard 5.48 32.90 1.85 6%
Under 18's 12.96 Standard 2.59 15.55 13.75 Standard 2.75 16.50 0.95 6%
Hire of Pony Park - Bute Concession 43.46 Standard 8.69 52.15 46.08 Standard 9.22 55.30 3.15 6%
Hire of Howie Pavilion, Lomond 11.40 Exempt 0.00 11.40 12.10 Exempt 0.00 12.10 0.70 6%
OUTDOOR RECREATION
Adult 3.13 Standard 0.63 3.75 3.33 Standard 0.67 4.00 0.25 7%
Concession 1.63 Standard 0.33 1.95 1.71 Standard 0.34 2.05 0.10 5%
Adult 3.13 Standard 0.63 3.75 3.33 Standard 0.67 4.00 0.25 7%
Concession 1.63 Standard 0.33 1.95 1.71 Standard 0.34 2.05 0.10 5%
Adult 58.96 Standard 11.79 70.75 62.50 Standard 12.50 75.00 4.25 6%
Concession 29.00 Standard 5.80 34.80 30.75 Standard 6.15 36.90 2.10 6%
Adult 3.13 Standard 0.63 3.75 3.33 Standard 0.67 4.00 0.25 7%
Concession 1.63 Standard 0.33 1.95 1.71 Standard 0.34 2.05 0.10 5%
Adult 3.13 Standard 0.63 3.75 3.33 Standard 0.67 4.00 0.25 7%
Concession 1.63 Standard 0.33 1.95 1.71 Standard 0.34 2.05 0.10 5%
Adult 71.08 Standard 14.22 85.30 75.33 Standard 15.07 90.40 5.10 6%
Concession 35.67 Standard 7.13 42.80 37.79 Standard 7.56 45.35 2.55 6%
Cricket Wicket (unprepared) Adult 39.29 Standard 7.86 47.15 41.67 Standard 8.33 50.00 2.85 6%
Cricket Wicket (prepared) Adult 71.08 Standard 14.22 85.30 75.33 Standard 15.07 90.40 5.10 6%
Hire of McCaigs Tower (Weddings) 355.58 Standard 71.12 426.70 376.92 Standard 75.38 452.30 25.60 6%
Hire of Stadium (Mossfield, Dunoon and Rothesay) for a
major event - MINIMUM CHARGE 853.13 Standard 170.63 1,023.75 904.29 Standard 180.86 1,085.15 61.40 6%
Dunoon Stadium - Hire of running Track-without marking 14.25 Standard 2.85 17.10 15.13 Standard 3.03 18.15 1.05 6%
Dunoon Stadium - Hire of Running Track-with marking 64.00 Standard 12.80 76.80 67.83 Standard 13.57 81.40 4.60 6%
Grass Tracks - Hire of Running Track (without marking) 14.25 Standard 2.85 17.10 15.13 Standard 3.03 18.15 1.05 6%
Grass Tracks - Hire of Running Track (with marking) 193.38 Standard 38.68 232.05 204.96 Standard 40.99 245.95 13.90 6%
Grandstand (Public Restricted) 271.63 Standard 54.33 325.95 287.92 Standard 57.58 345.50 19.55 6%
Rental of Stall - Per Linear Metre 71.42 Standard 14.28 85.70 75.71 Standard 15.14 90.85 5.15 6%
Rental of Stall - by Registered Charity - by Stall 34.17 Standard 6.83 41.00 36.21 Standard 7.24 43.45 2.45 6%
FAIRS
Charges for commercial refuse/tidy up
will be over and above the charges
noted.
All hire must be paid for in advance.
Block Bookings (10 consecutive bookings)
booked in advance is VAT exempt.
Minimum of 48 hours notice is required if the
pitch requires to be lined.
48 hours notice of cancellation required in
order to be reimbursed.
Hire of Howie Pavilion - standard VAT
should be applied if Council staff are
involved in setting up the hall.
A 25% reduction on cost will be offered to
groups making block bookings. A block
booking is defined as 5 or more bookings
within any 3 month period.
Hire of lined Pitch with Changing Facilities including attendant
required for changing facilities (2.5 hours)
Hire of lined Pitch only (2.5 hours)
Hire of Pitch for Training with changing facilities (2 hours)
The stadium fee is the daily rate applied and
is for use of the stadium hire only, including
the spectator area/pavilion and toilet block. 
Any other service requirements are outwith
this charge, and will be charged separately.
Putting and Crazy Golf
Tennis - Per Session
Tennis - Season Ticket
Tennis - Hire of Racquet and Balls
Bowling - Per Session
Bowling - Season Ticket
Amenities Page 25
Page 106

Page 107

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2024-25 Increase2025-26
Hire of ground for 1 week (7 days) With total frontage of all
rides/stalls, less than 49 linear metres 434.50 Exempt 0.00 434.50 460.55 Exempt 0.00 460.55 26.05 6%
Hire of Ground for 1 week (7 days). With total frontage of all
rides/stalls, over 49 linear metres - per linear metre 8.95 Exempt 0.00 8.95 9.50 Exempt 0.00 9.50 0.55 6%
Food Vans/Stalls - Hire of Ground per week (7days) - per
linear metre 6.65 Exempt 0.00 6.65 7.05 Exempt 0.00 7.05 0.40 6%
Charitable Organisations - Hire of Ground up to 7 days - per
linear metre 4.50 Exempt 0.00 4.50 4.75 Exempt 0.00 4.75 0.25 6%
FLORAL DECORATIONS
Hire of Round or Half Baskets (each) 21.88 Standard 4.38 26.25 23.21 Standard 4.64 27.85 1.60 6%
Troughs 1 Metre Long (each) 26.58 Standard 5.32 31.90 28.17 Standard 5.63 33.80 1.90 6%
Tubs to 16" diameter (each) 31.38 Standard 6.28 37.65 33.25 Standard 6.65 39.90 2.25 6%
Tubs over 16" diameter (each) 45.46 Standard 9.09 54.55 48.17 Standard 9.63 57.80 3.25 6%
Handling Charge
BURIAL CHARGES
*Interment/Re Opening Lair 992.00 Outwith the Scope 0.00 992.00 1,052.00
Outwith the
Scope 0.00 1,052.00 60.00 6%
Interment (Child under 18)
Additional Charge - Interment on Saturday/Sunday or Public
Holiday will incur this additional charge 370.00 Outwith the Scope 0.00 370.00 392.00
Outwith the
Scope 0.00 392.00 22.00 6%
Additional Charge - Burial of ashes on Saturday/Sunday or
Public Holiday will incur this additional charge 106.00 Outwith the Scope 0.00 106.00 112.00
Outwith the
Scope 0.00 112.00 6.00 6%
*Burial of cremated remains at minimum depth
Deceased remains
being interred at 3
feet as per current
procedures 224.00 Outwith the Scope 0.00 224.00 237.00
Outwith the
Scope 0.00 237.00 13.00 6%
*Burial of cremated remains at available depth
Deceased remains
being interred at a
greater depth per
new legislation 992.00 Outwith the Scope 0.00 992.00 1,052.00
Outwith the
Scope 0.00 1,052.00 60.00 6%
*Scattering of Ashes 172.00 Outwith the Scope 0.00 172.00 182.00
Outwith the
Scope 0.00 182.00 10.00 6%
Purchase of Lair - exclusive right of burial (Child under 18)
*Purchase of Burial Lair, incl maintenance 1,169.00 Exempt 0.00 1,169.00 1,239.00 Exempt 0.00 1,239.00 70.00 6%
*Lair for Casket only 241.00 Exempt 0.00 241.00 255.00 Exempt 0.00 255.00 14.00 6%
*Woodland and Green Burial Service Burial Charge 992.00 Outwith the Scope 0.00 992.00 1,052.00
Outwith the
Scope 0.00 1,052.00 60.00 6%
*Woodland and Green Burial Service Standard Lair 2,344.00 Exempt 0.00 2,344.00 2,485.00 Exempt 0.00 2,485.00 141.00 6%
Transfer of Title Deeds 64.00 Outwith the Scope 0.00 64.00 68.00
Outwith the
Scope 0.00 68.00 4.00 6%
Extract/Search Register (£13.20 to be paid in Advance for
work up to half an hour) 37.00 Outwith the Scope 0.00 37.00 39.00
Outwith the
Scope 0.00 39.00 2.00 5%
Administration Fee for Return of Lair
10% of purchase
price (90%
returned) Standard 0.00 Standard 0.00
Permission to erect Standard Memorial or one off design 193.00 Exempt 0.00 193.00 205.00 Exempt 0.00 205.00 12.00 6%
Permission to erect semi recumbent book type memorial 94.00 Exempt 0.00 94.00 100.00 Exempt 0.00 100.00 6.00 6%
Erection of plaques at Cemeteries (where consent granted) 94.00 Outwith the Scope 0.00 94.00 100.00
Outwith the
Scope 0.00 100.00 6.00 6%
Erection of inscribed memorial plaque (for previously
unmarked graves) 322.00 Outwith the Scope 0.00 322.00 341.00
Outwith the
Scope 0.00 341.00 19.00 6%
Erection of Headstone (Tiree ONLY) 248.00 Outwith the Scope 0.00 248.00 263.00
Outwith the
Scope 0.00 263.00 15.00 6%
Exhumations (not including re interment) 1,062.00 Exempt 0.00 1,062.00 1,126.00 Exempt 0.00 1,126.00 64.00 6%
No charge No charge
Loss or damage to containers will be
charged to hirer at replacement value.
* 100% to be added to interment/lair
charges (except for the transfer of title
deed) for non residents of Argyll & Bute with
the following exemptions:  
1. Clear proof that deceased lived
permanently in Argyll & Bute within 10 years
of death.   
2. If the deceased person has been in long
term residential care outwith the boundaries
of Argyll & Bute Council, but was previously
a resident of Argyll & Bute and was moved
to such residential care at the behest of this,
or a previous Local Authority.
3. Any resident or former resident of Argyll
& Bute who has died in the service of their
country.
4. Permission for erection of memorial to be
paid at same time as purchase of lair.
5. Burial Lair may include up to 3 standard
interments, dependant on depth of coffin.
At cost price with prior notice
No charge No charge
Amenities Page 26
Page 107

Page 108

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2024-25 Increase2025-26
Exhumations of Caskets (hourly rate) 69.00 Exempt 0.00 69.00 73.00 Exempt 0.00 73.00 4.00 6%
CREMATORIUM CHARGES
Child (under 18)
Adults 18 years and over
939.00 Exempt 0.00 939.00 1,034.00 Exempt 0.00 1,034.00 95.00 10%
Adults 18 years and over - Saturday 1,041.00 Exempt 0.00 1,041.00 1,142.00 Exempt 0.00 1,142.00 101.00 10%
Additional Charge - Public Holiday 335.00 Exempt 0.00 335.00 355.00 Exempt 0.00 355.00 20.00 6%
Direct Cremations (no use of chapel) 643.00 Exempt 0.00 643.00 721.00 Exempt 0.00 721.00 78.00 12%
Direct Cremations (no use of chapel) - Saturday 712.00 Exempt 0.00 712.00 794.00 Exempt 0.00 794.00 82.00 12%
Direct Cremations (no use of chapel) -
Additional Charge Public Holiday 335.00 Exempt 0.00 335.00 355.00 Exempt 0.00 355.00 20.00 6%
Clergy 94.17 Standard 18.83 113.00 100.00 Standard 20.00 120.00 7.00 6%
Access to Undertake Live Streaming of Cremation Services 27.00 Exempt 0.00 27.00 29.00 Exempt 0.00 29.00 2.00 7%
Dispersal of Ashes 37.00 Exempt 0.00 37.00 39.00 Exempt 0.00 39.00 2.00 5%
Charge for Dispersal of Ashes for
Cremations held at Cardross Crematorium
now absorbed within the Cremation Fee. 
Where the Cremation is held elsewhere, but
the Ashes dispersed at Cardross, this fee
will continue.”
Casket - Purchase 67.50 Standard 13.50 81.00 71.67 Standard 14.33 86.00 5.00 6%
Urn (plus carrier) - Purchase 30.83 Standard 6.17 37.00 32.50 Standard 6.50 39.00 2.00 5%
Book of Remembrance (per line) 42.50 Standard 8.50 51.00 45.00 Standard 9.00 54.00 3.00 6%
Small Book of Remembrance (2 Lines) 134.17 Standard 26.83 161.00 142.50 Standard 28.50 171.00 10.00 6%
Small Book of Remembrance (5 Lines) 250.00 Standard 50.00 300.00 265.00 Standard 53.00 318.00 18.00 6%
Small Book of Remembrance (8 Lines) 367.50 Standard 73.50 441.00 389.17 Standard 77.83 467.00 26.00 6%
Small Book of Remembrance (Gilded Motif) 90.00 Standard 18.00 108.00 95.00 Standard 19.00 114.00 6.00 6%
Badges 69.17 Standard 13.83 83.00 73.33 Standard 14.67 88.00 5.00 6%
Coat of Arms and Floral Motif 93.33 Standard 18.67 112.00 99.17 Standard 19.83 119.00 7.00 6%
Retention of Ashes - per month 16.00 Exempt 0.00 16.00 17.00 Exempt 0.00 17.00 1.00 6%
Chapel of Rest 50.83 Standard 10.17 61.00 54.17 Standard 10.83 65.00 4.00 7%
Plaque - Single with inscription (25 years) 234.17 Standard 46.83 281.00 248.33 Standard 49.67 298.00 17.00 6%
Plaque - Single continuation of lease (25 years) 141.67 Standard 28.33 170.00 150.00 Standard 30.00 180.00 10.00 6%
Plaque - Double with single inscriptions (25 years) 340.00 Standard 68.00 408.00 360.00 Standard 72.00 432.00 24.00 6%
Plaque - Double with two inscriptions (25 years) 431.67 Standard 86.33 518.00 457.50 Standard 91.50 549.00 31.00 6%
Plaque - Double continuation of lease (25 years) 282.50 Standard 56.50 339.00 299.17 Standard 59.83 359.00 20.00 6%
Additional inscription 127.50 Standard 25.50 153.00 135.00 Standard 27.00 162.00 9.00 6%
Use of Crematorium Chapel for a Burial Service 295.83 Standard 59.17 355.00 313.33 Standard 62.67 376.00 21.00 6%
Memorial Kerbstone - (10 years) 290.83 Standard 58.17 349.00 308.33 Standard 61.67 370.00 21.00 6%
Inscription for Kerbstone 10.83 Standard 2.17 13.00 11.67 Standard 2.33 14.00 1.00 8%
No charge No charge
This complies with the Scottish
Governments funeral poverty guidance.
Amenities Page 27
Page 108

Page 109

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
FERRY FARES
SPT Concessionary Travel Scheme  - Single
STATUTORY
CHARGE
SPT Concessionary Travel Scheme  - Return
STATUTORY
CHARGE
Out of hours Service - Cuan/Easdale/Lismore - up to Midnight
(excl. commercial vehicles) 86.30 Zero Rated 0.00 86.30 91.50 Zero Rated 0.00 91.50 5.20 6%
Out of hours Service - Cuan - Commercial Vehicles - up to
Midnight 71.92 Standard 14.38 86.30 76.25 Standard 15.25 91.50 5.20 6%
Out of hours Service - Cuan/Easdale/Lismore - After Midnight
(excl. commercial vehicles) 111.50 Zero Rated 0.00 111.50 118.20 Zero Rated 0.00 118.20 6.70 6%
Out of hours Service - Cuan - Commercial Vehicles - after
Midnight 92.92 Standard 18.58 111.50 98.50 Standard 19.70 118.20 6.70 6%
Easdale/Cuan Passenger Fares - Adult - Return 2.70 Zero Rated 0.00 2.70 2.85 Zero Rated 0.00 2.85 0.15 6%
Easdale/Cuan Passenger Fares - Adult – 5 Return Journeys 8.50 Zero Rated 0.00 8.50 9.00 Zero Rated 0.00 9.00 0.50 6%
Easdale/Cuan Passenger Fares - Child – Return 1.50 Zero Rated 0.00 1.50 1.60 Zero Rated 0.00 1.60 0.10 7%
Easdale/Cuan Passenger Fares - Child – 5 Return Journeys 4.10 Zero Rated 0.00 4.10 4.35 Zero Rated 0.00 4.35 0.25 6%
Easdale freight (domestic & commercial) - half boat load 12.33 Standard 2.47 14.80 13.08 Standard 2.62 15.70 0.90 6%
Easdale freight (domestic & commercial) - full boat load 23.83 Standard 4.77 28.60 25.25 Standard 5.05 30.30 1.70 6%
Cuan Vehicle Fares - Car including concession driver return -
must present SPT ferry travel card 12.40 Zero Rated 0.00 12.40 0%
New Fare Linked To Concessions And
Including The Driver In Overall Fare
Cuan Vehicle Fares - Car with blue badge holder (25%
discount) including concession driver return - must present
SPT ferry travel card 9.70 Zero Rated 0.00 9.70 0%
New Fare Linked To Concessions And
Including The Driver In Overall Fare
Blue Badge Discount Now 25% Rather
Than 50% To Align With Others (See Cal
Mac). Spt Discount For Travel Card Holder
Too
Cuan Vehicle Fares - Car with blue badge holder (25%
discount) including driver return 9.70 Zero Rated 0.00 11.10 0%
New Fare Linked To Concessions And
Including The Driver In Overall Fare
Blue Badge Discount Now 25% Rather
Than 50% To Align With Others (See Cal
Mac)
Cuan Vehicle Fares - Private Vehicles - cars, trailers or
caravans - Return - Up to and Including 5m (incl driver) 13.00 Zero Rated 0.00 13.00 13.80 Zero Rated 0.00 13.80 0.80 6%
Cuan Vehicle Fares - Private Vehicles - cars, trailers or
caravans - Up to and Including 5m - 5 Return Journeys (incl
driver) 42.40 Zero Rated 0.00 42.40 44.95 Zero Rated 0.00 44.95 2.55 6%
Cuan Vehicle Fares - Private Vehicles - cars, trailers or
caravans - Up to and including 5m – 3 Monthly Unlimited
(domestic travellers only - car and driver only) 297.10 Zero Rated 0.00 297.10 315.00 Zero Rated 0.00 315.00 17.90 6% Round up to £315
Cuan Vehicle Fares - Private Vehicles - Motorcycle - Return
(incl rider) 6.90 Zero Rated 0.00 6.90 7.30 Zero Rated 0.00 7.30 0.40 6%
Cuan Vehicle Fares - Private Vehicles - Motorcycle - 5 Return
Journeys (incl rider) 22.20 Zero Rated 0.00 22.20 23.55 Zero Rated 0.00 23.55 1.35 6%
Cuan Vehicle Fares - Commercial Vehicles/Coaches - 5.01m
to 8.0m - Return (incl driver) 20.42 Standard 4.08 24.50 21.63 Standard 4.33 25.95 1.45 6%
Cuan Vehicle Fares - Commercial Vehicles/Coaches - 8.01m
to 12.0m - Return (incl driver) 29.58 Standard 5.92 35.50 31.38 Standard 6.28 37.65 2.15 6%
Cuan Vehicle Fares - Commercial Vehicles/Coaches - 12.01m
to 18.0m - Return (incl driver) 57.92 Standard 11.58 69.50 61.38 Standard 12.28 73.65 4.15 6%
2024-25 2025-26 Increase
Statutory Charge Set by SPT
Age 5 to 16 - Child Fare
Age 16 and above - Adult Fare
Free Travel: Children up to Age 5, Scholars,
Primary School Escort,  Pre-5 Escort
Ferries, Piers & Harbours Page 28
Page 109

Page 110

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2024-25 2025-26 Increase
Cuan Vehicle Fares - Commercial Vehicles/Coaches - 5.01m
to 8.0m -  5 Return Journeys (incl driver) 95.50 Standard 19.10 114.60 101.25 Standard 20.25 121.50 6.90 6%
Cuan Vehicle Fares - Commercial Vehicles/Coaches - 8.01m
to 12.0m - 5 Return Journeys (incl driver) 140.83 Standard 28.17 169.00 149.29 Standard 29.86 179.15 10.15 6%
Cuan Vehicle Fares - Commercial Vehicles/Coaches - 12.01m
to 18.0m -5  Return Journeys (incl driver) 279.00 Standard 55.80 334.80 295.75 Standard 59.15 354.90 20.10 6%
Lismore Passenger Fares - Adult - Single 2.40 Zero Rated 0.00 2.40 2.55 Zero Rated 0.00 2.55 0.15 6%
Jura Passenger Fares - Adult - Single 2.40 Zero Rated 0.00 2.40 2.55 Zero Rated 0.00 2.55 0.15 6%
Lismore Passenger Fares - Adult - 10 Journeys 15.20 Zero Rated 0.00 15.20 16.10 Zero Rated 0.00 16.10 0.90 6%
Jura Passenger Fares - Adult - 10 Journeys 15.20 Zero Rated 0.00 15.20 16.10 Zero Rated 0.00 16.10 0.90 6%
Lismore Passenger Fares - Child - Single 1.40 Zero Rated 0.00 1.40 1.50 Zero Rated 0.00 1.50 0.10 7%
Jura Passenger Fares - Child - Single 1.40 Zero Rated 0.00 1.40 1.50 Zero Rated 0.00 1.50 0.10 7%
Lismore Passenger Fares - Child - 10 Journeys 7.30 Zero Rated 0.00 7.30 7.75 Zero Rated 0.00 7.75 0.45 6%
Jura Passenger Fares - Child - 10 Journeys 7.30 Zero Rated 0.00 7.30 7.75 Zero Rated 0.00 7.75 0.45 6%
Jura Vehicle Fares - Private Vehicles - Excursion Return (incl
driver) 23.20 Zero Rated 0.00 23.20 24.60 Zero Rated 0.00 24.60 1.40 6%
Jura Vehicle Fares - Private Vehicles -  Car including
concession driver return - must present SPT ferry travel
card 21.10 Zero Rated 0.00 21.10 21.10 0%
New Fare Linked To Concessions And
Including The Driver In Overall Fare
Jura Vehicle Fares - Private Vehicles -  Car with blue badge
holder (25% discount) including concession driver return -
must present SPT ferry travel card 16.20 Zero Rated 0.00 16.20 0.00 0%
New Fare Linked To Concessions And
Including The Driver In Overall Fare
Blue Badge Discount Now 25% Rather
Than 50% To Align With Others (See Cal
Mac). Spt Discount For Travel Card Holder
Too
Jura Vehicle Fares - Private Vehicles -  Car with blue badge
holder (25% discount) including driver return 19.70 Zero Rated 0.00 19.70 0.00 0%
New Fare Linked To Concessions And
Including The Driver In Overall Fare
Blue Badge Discount Now 25% Rather
Than 50% To Align With Others (See Cal
Mac)
Jura Vehicle Fares - all vehicles up to and including 6m -
single journey (incl driver) 11.40 Zero Rated 0.00 11.40 12.50 Zero Rated 0.00 12.50 1.10 10% Change "Up To And Including 6M"
Jura Vehicle Fares - all vehicles up to and including 6m - 10
Single Journeys (incl driver) 74.10 Zero Rated 0.00 74.10 78.55 Zero Rated 0.00 78.55 4.45 6% Change "Up To And Including 6M"
Jura Vehicle Fares - all vehicles up to and including 6m - 50
Single Journeys (incl driver) Zero Rated 0.00 365.30 387.20 Zero Rated 0.00 387.20 21.90 6% Change "Up To And Including 6M"
Jura Vehicle Fares - Private Vehicles - Motorcycle - Single
(incl rider) 7.00 Zero Rated 0.00 7.00 7.40 Zero Rated 0.00 7.40 0.40 6%
Jura Vehicle Fares - Private Vehicles - Motorcycle - 10
Journeys (incl rider) 44.90 Zero Rated 0.00 44.90 47.60 Zero Rated 0.00 47.60 2.70 6%
Jura Vehicle Fares - Private Vehicles - Motorhomes - 6.01m
to 8.0m - Return (incl driver) 54.40 Zero Rated 0.00 54.40 57.65 Zero Rated 0.00 57.65 3.25 6% Change "6.01M To 8M"
Jura Vehicle Fares - Private Vehicles - Motorhomes - 8.01m
to 12.0m - Return (incl driver) 76.00 Zero Rated 0.00 76.00 80.55 Zero Rated 0.00 80.55 4.55 6%
Jura Vehicle Fares - Commercial Vehicles/Coaches - 6.01m
to 8.0m Return (incl driver) 45.33 Standard 9.07 54.40 48.04 Standard 9.61 57.65 3.25 6% Change "6.01M To 8M"
Jura Vehicle Fares - Commercial Vehicles/Coaches - 8.01m
to 12.0m Return (incl driver) 63.33 Standard 12.67 76.00 67.13 Standard 13.43 80.55 4.55 6%
Jura Vehicle Fares - Commercial Vehicles/Coaches - 12.01m
to 18.0m Return (incl driver) 125.00 Standard 25.00 150.00 132.50 Standard 26.50 159.00 9.00 6%
Jura Vehicle Fares - Commercial Vehicles carrying
Dangerous Goods return (incl driver) 125.00 Standard 25.00 150.00 132.50 Standard 26.50 159.00 9.00 6%
Jura Vehicle Fares - Commercial Vehicles/Coaches - Out of
Hours service - up to Midnight 87.67 Standard 17.53 105.20 111.51 Standard 22.30 111.50 6.30 6%
Recommend out of hours service is £125
plus VAT
Age 5 to 16 - Child Fare
Age 16 and above - Adult Fare
Free Travel: Children up to Age 5, Scholars,
Primary School Escort,  Pre-5 Escort
Ferries, Piers & Harbours Page 29
Page 110

Page 111

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2024-25 2025-26 Increase
PIERS AND HARBOURS  - RATES - GOODS,
PASSENGERS & VEHICLES
Rates for Goods Shipped, Transhipped
or Unshipped at the Pier or Ferry Slip or
within the Harbour
General Goods Packaged (per tonne )Includes Fruit,
Beverages, Meat, Dairy Products, General Groceries and
Confectionery, Cured Fish, etc. 3.00 Zero Rated 0.00 3.00 3.20 Zero Rated 0.00 3.20 0.20 7%
Dry Bulk Commodities (per tonne) Ores, Aggregates and
Crushed Stone, Cement and Building Materials, Timber
(including Logs), Salt, etc. 2.67 Zero Rated 0.00 2.67 2.85 Zero Rated 0.00 2.85 0.18 7%
Liquid and Gaseous Bulk Products (per tonne) 3.34 Zero Rated 0.00 3.34 3.55 Zero Rated 0.00 3.55 0.21 6%
Explosives (per tonne) 118.88 Zero Rated 0.00 118.88 126.00 Zero Rated 0.00 126.00 7.12 6%
Livestock  - Poultry (per bird) 0.53 Zero Rated 0.00 0.53 0.55 Zero Rated 0.00 0.55 0.02 4%
Animals (per Animal) 1.00 Zero Rated 0.00 1.00 1.05 Zero Rated 0.00 1.05 0.05 5%
Smolt (per thousand) 6.80 Zero Rated 0.00 6.80 7.20 Zero Rated 0.00 7.20 0.40 6%
Fish, including Shellfish  - Fresh, all varieties and also fish
consigned for sale at other markets - percentage of catch 2.50% If Applicable 0.00 0.00 If Applicable 0.00 0.00
2.50% of catch
Rates on Passenger and Vehicles - Adult Passengers landing
at or embarking from pier (each) 0.61 Zero Rated 0.00 0.61 0.65 Zero Rated 0.00 0.65 0.04 7%
Rates on Passenger and Vehicles - Child Passengers landing
at or embarking from pier (each) 0.38 Zero Rated 0.00 0.38 0.40 Zero Rated 0.00 0.40 0.02 5%
Rates on Passenger and Vehicles - Private Cars, Taxis,
Hearses and Agricultural Machinery (Tractors, Trailers, etc.)
(each) 1.92 Zero Rated 0.00 1.92 2.05 Zero Rated 0.00 2.05 0.13 7%
Rates on Passenger and Vehicles - Caravans or Trailers
(except Commercial Trailers) (each) 3.05 Zero Rated 0.00 3.05 3.25 Zero Rated 0.00 3.25 0.20 7%
Rates on Passenger and Vehicles - Cycles (each) 0.53 Zero Rated 0.00 0.53 0.55 Zero Rated 0.00 0.55 0.02 4%
Rates on Passenger and Vehicles - Motorcycles including
sidecar (each) 1.29 Zero Rated 0.00 1.29 1.35 Zero Rated 0.00 1.35 0.06 5%
Rates on Passenger and Vehicles - Buses (each) 10.62 Zero Rated 0.00 10.62 11.25 Zero Rated 0.00 11.25 0.63 6%
Rates on Passenger and Vehicles - Commercial Vehicles -
Per Metre 1.29 Zero Rated 0.00 1.29 1.35 Zero Rated 0.00 1.35 0.06 5%
PIERS AND HARBOURS  - RATES - MISCELLANEOUS
Mobile Cranage - for each lift 17.03 Zero Rated 0.00 17.03 18.05 Zero Rated 0.00 18.05 1.02 6%
Fresh Water - per tonne or part thereof (minimum charge
£10) 4.88 Zero Rated 0.00 4.88 5.15 Zero Rated 0.00 5.15 0.27 6%
Left Luggage - per article up to 24hours (minimum charge
£10) 4.21 Standard 0.84 5.05 4.46 Standard 0.89 5.35 0.30 6%
Parcels and Packages up to 50 kg (minimum charge £10) 0.44 Standard 0.09 0.53 0.46 Standard 0.09 0.55 0.02 4%
Parcels and Packages- where articles can be measured -
charge per cubic metre (minimum charge £10) 4.70 Standard 0.94 5.64 5.00 Standard 1.00 6.00 0.36 6%
Parcels and Packages- where articles cannot be measured -
charge per tonne (minimum charge £10) 4.70 Standard 0.94 5.64 5.00 Standard 1.00 6.00 0.36 6%
Rope Handling - To be charged each time i.e. Arrival and
departure to be charged separately (NB to be charged to
ferries where additional resources are required) 191.05 Zero Rated 0.00 191.05 202.50 Zero Rated 0.00 202.50 11.45 6%
In determining weights for the purpose of
charging dues, the weights of the containers
of any goods shall be included.
In terms of liquid, gaseous bulk products,
bulk shipments of materials may be charged
at discounted rates subject to a request
being made in writing to the Executive
Director, Development and Infrastructure,
who will then refer the letter to the full
Council.
All empty boxes, barrels, sacks and
packages if previously shipped or landed will
be exempt.                                                      
Passengers Personal Baggage shall be free
of charge.
For goods remaining in sheds or on the pier
or quays for a period longer than 24 hours,
50% of the original pier dues shall be
charged for each 24 hours or part thereof.
Provided that in the case of sheds occupied
from time to time under lease or let from the
Council such dues shall not be charged
against the occupier or leasee.   The terms
of such leases or lets shall be subject to
individual negotiation with the Executive
Director.
(Note there is a minimum charge of £10.00
for some items)
Ferries, Piers & Harbours Page 30
Page 111

Page 112

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2024-25 2025-26 Increase
Timber Debris Clearance 477.71 Standard 95.54 573.25 506.38 Standard 101.28 607.65 34.40 6%
Cost of clearing site reflected in increase in
charge.
Use of Linkspan - Commercial use 458.05 Zero Rated 0.00 458.05 485.55 Zero Rated 0.00 485.55 27.50 6%
Use of Linkspan - non-vehicular traffic 53.40 Zero Rated 0.00 53.40 56.60 Zero Rated 0.00 56.60 3.20 6%
Operational Duties on behalf of external bodies    
Car and Pedestrian marshalling - Rothesay and Dunoon (per
day) 155.17 Standard 31.03 186.20 164.46 Standard 32.89 197.35 11.15 6%
Freight handling - Rothesay Harbour 15.25 Standard 3.05 18.30 16.17 Standard 3.23 19.40 1.10 6%
Electricity (per unit) 0.24 Standard 0.05 0.29 0.25 Standard 0.05 0.30 0.01 3%
Slipway Landing fee 7.60 Zero Rated 0.00 7.60 8.05 Zero Rated 0.00 8.05 0.45 6%
Cruise calls/tenders 763.35 Zero Rated 0.00 763.35 809.15 Zero Rated 0.00 809.15 45.80 6%
Oban Transit Marina
Daily Rate (Between 11:00 and 16:00) 12.67 Standard 2.53 15.20 13.42 Standard 2.68 16.10 0.90 6%
Overnight Charge (per metre length) 3.17 Standard 0.63 3.80 3.38 Standard 0.68 4.05 0.25 7% Maximum of 3 nights stay
Oban Harbour Conservancy Charges
Vessels with a GRT over 50 registered tonnage (per tonne) 0.07 Zero Rated 0.00 0.07 0.07 Zero Rated 0.00 0.07 0.00 0% charge per tonnage
Calmac Vessels (per tonne) 0.02 Zero Rated 0.00 0.02 0.02 Zero Rated 0.00 0.02 0.00 0% charge per tonnage
PIERS AND HARBOURS  - RATES - VESSELS
1 - Basic Rate  - all vessels to be charged at this rate
unless eligible for categories 2, 3, 4 - see comment 2
COMMENTS
1. The category and rate under which a
vessel is to be charged must be paid at the
Up to 5 metres in length
Per visit up to 24
hours 15.75 Zero Rated 0.00 15.75 16.20 Zero Rated 0.00 16.20 0.45 3%
Up to 6 metres in length
Per visit up to 24
hours 19.05 Zero Rated 0.00 19.05 19.60 Zero Rated 0.00 19.60 0.55 3%
Up to 7 metres in length
Per visit up to 24
hours 21.85 Zero Rated 0.00 21.85 22.50 Zero Rated 0.00 22.50 0.65 3%
Up to 8 metres in length
Per visit up to 24
hours 25.25 Zero Rated 0.00 25.25 26.00 Zero Rated 0.00 26.00 0.75 3%
Up to 9 metres in length
Per visit up to 24
hours 28.25 Zero Rated 0.00 28.25 29.10 Zero Rated 0.00 29.10 0.85 3%
Up to 10 metres in length
Per visit up to 24
hours 31.50 Zero Rated 0.00 31.50 32.45 Zero Rated 0.00 32.45 0.95 3%
Over 10 metres in length - charge per metre
Per visit up to 24
hours 3.10 Zero Rated 0.00 3.10 3.20 Zero Rated 0.00 3.20 0.10 3%
Up to 5 metres in length Weekly 78.30 Zero Rated 0.00 78.30 80.65 Zero Rated 0.00 80.65 2.35 3%
Up to 6 metres in length Weekly 93.95 Zero Rated 0.00 93.95 96.75 Zero Rated 0.00 96.75 2.80 3%
Up to 7 metres in length Weekly 109.50 Zero Rated 0.00 109.50 112.80 Zero Rated 0.00 112.80 3.30 3%
Up to 8 metres in length Weekly 127.30 Zero Rated 0.00 127.30 131.10 Zero Rated 0.00 131.10 3.80 3%
Up to 9 metres in length Weekly 142.05 Zero Rated 0.00 142.05 146.30 Zero Rated 0.00 146.30 4.25 3%
Up to 10 metres in length Weekly 156.55 Zero Rated 0.00 156.55 161.25 Zero Rated 0.00 161.25 4.70 3%
Up to 5 metres in length Summer 574.25 Zero Rated 0.00 574.25 591.50 Zero Rated 0.00 591.50 17.25 3%
Up to 6 metres in length Summer 689.00 Zero Rated 0.00 689.00 709.65 Zero Rated 0.00 709.65 20.65 3%
Up to 7 metres in length Summer 803.85 Zero Rated 0.00 803.85 827.95 Zero Rated 0.00 827.95 24.10 3%
Up to 8 metres in length Summer 918.65 Zero Rated 0.00 918.65 946.20 Zero Rated 0.00 946.20 27.55 3%
Up to 9 metres in length Summer 1,033.50 Zero Rated 0.00 1,033.50 1,064.50 Zero Rated 0.00 1,064.50 31.00 3%
Up to 10 metres in length Summer 1,148.45 Zero Rated 0.00 1,148.45 1,182.90 Zero Rated 0.00 1,182.90 34.45 3%
Up to 5 metres in length Winter 417.60 Zero Rated 0.00 417.60 430.15 Zero Rated 0.00 430.15 12.55 3%
Up to 6 metres in length Winter 501.10 Zero Rated 0.00 501.10 516.15 Zero Rated 0.00 516.15 15.05 3%
Up to 7 metres in length Winter 584.80 Zero Rated 0.00 584.80 602.35 Zero Rated 0.00 602.35 17.55 3%
Ferries, Piers & Harbours Page 31
Page 112

Page 113

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2024-25 2025-26 Increase
Up to 8 metres in length Winter 668.10 Zero Rated 0.00 668.10 688.15 Zero Rated 0.00 688.15 20.05 3%
Up to 9 metres in length Winter 751.65 Zero Rated 0.00 751.65 774.20 Zero Rated 0.00 774.20 22.55 3%
Up to 10 metres in length Winter 835.10 Zero Rated 0.00 835.10 860.15 Zero Rated 0.00 860.15 25.05 3%
1a - Any ship of a gross tonnage less than 15 tonnes or
used for recreation or pleasure -  charge is subject to
20% VAT 0.00 0.00 0.00
Up to 5 metres in length
Per visit up to 24
hours 13.42 Standard 2.68 16.10 13.83 Standard 2.77 16.60 0.50 3%
Up to 6 metres in length
Per visit up to 24
hours 16.00 Standard 3.20 19.20 16.50 Standard 3.30 19.80 0.60 3%
Up to 7 metres in length
Per visit up to 24
hours 18.67 Standard 3.73 22.40 19.21 Standard 3.84 23.05 0.65 3%
Up to 8 metres in length
Per visit up to 24
hours 21.29 Standard 4.26 25.55 21.92 Standard 4.38 26.30 0.75 3%
Up to 9 metres in length
Per visit up to 24
hours 24.00 Standard 4.80 28.80 24.71 Standard 4.94 29.65 0.85 3%
Up to 10 metres in length
Per visit up to 24
hours 26.63 Standard 5.33 31.95 27.42 Standard 5.48 32.90 0.95 3%
Over 10 metres in length - charge per metre
Per visit up to 24
hours 2.68 Standard 0.54 3.21 2.76 Standard 0.55 3.31 0.10 3%
Up to 5 metres in length Weekly 66.63 Standard 13.33 79.95 68.63 Standard 13.73 82.35 2.40 3%
Up to 6 metres in length Weekly 79.79 Standard 15.96 95.75 82.17 Standard 16.43 98.60 2.85 3%
Up to 7 metres in length Weekly 93.13 Standard 18.63 111.75 95.92 Standard 19.18 115.10 3.35 3%
Up to 8 metres in length Weekly 108.29 Standard 21.66 129.95 111.54 Standard 22.31 133.85 3.90 3%
Up to 9 metres in length Weekly 120.67 Standard 24.13 144.80 124.29 Standard 24.86 149.15 4.35 3%
Up to 10 metres in length Weekly 133.08 Standard 26.62 159.70 137.08 Standard 27.42 164.50 4.80 3%
Up to 5 metres in length Summer 488.04 Standard 97.61 585.65 502.67 Standard 100.53 603.20 17.55 3%
Up to 6 metres in length Summer 585.63 Standard 117.13 702.75 603.21 Standard 120.64 723.85 21.10 3%
Up to 7 metres in length Summer 683.25 Standard 136.65 819.90 703.75 Standard 140.75 844.50 24.60 3%
Up to 8 metres in length Summer 780.83 Standard 156.17 937.00 804.25 Standard 160.85 965.10 28.10 3%
Up to 9 metres in length Summer 878.50 Standard 175.70 1,054.20 904.88 Standard 180.98 1,085.85 31.65 3%
Up to 10 metres in length Summer 976.13 Standard 195.23 1,171.35 1,005.42 Standard 201.08 1,206.50 35.15 3%
Up to 5 metres in length Winter 355.00 Standard 71.00 426.00 365.67 Standard 73.13 438.80 12.80 3%
Up to 6 metres in length Winter 425.88 Standard 85.18 511.05 438.67 Standard 87.73 526.40 15.35 3%
Up to 7 metres in length Winter 496.96 Standard 99.39 596.35 511.88 Standard 102.38 614.25 17.90 3%
Up to 8 metres in length Winter 567.88 Standard 113.58 681.45 584.92 Standard 116.98 701.90 20.45 3%
Up to 9 metres in length Winter 639.04 Standard 127.81 766.85 658.21 Standard 131.64 789.85 23.00 3%
Up to 10 metres in length Winter 710.04 Standard 142.01 852.05 731.33 Standard 146.27 877.60 25.55 3%
2 - Vessels actively engaged in a commercial
undertaking.
If registered:- per gross registered tonne (see comment 3) 0.56 Zero Rated 0.00 0.56 0.58 Zero Rated 0.00 0.58 0.02 4%
If not registered then:
Up to 5 metres in length
Per visit up to 24
hours 8.10 Zero Rated 0.00 8.10 8.34 Zero Rated 0.00 8.34 0.24 3%
Up to 10 metres in length
Per visit up to 24
hours 16.03 Zero Rated 0.00 16.03 16.51 Zero Rated 0.00 16.51 0.48 3%
Up to 15 metres in length
Per visit up to 24
hours 24.12 Zero Rated 0.00 24.12 24.84 Zero Rated 0.00 24.84 0.72 3%
Up to 20 metres in length
Per visit up to 24
hours 31.99 Zero Rated 0.00 31.99 32.95 Zero Rated 0.00 32.95 0.96 3%
Ferries, Piers & Harbours Page 32
Page 113

Page 114

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2024-25 2025-26 Increase
Up to 25 metres in length
Per visit up to 24
hours 40.15 Zero Rated 0.00 40.15 41.35 Zero Rated 0.00 41.35 1.20 3%
Up to 30 metres in length
Per visit up to 24
hours 48.68 Zero Rated 0.00 48.68 50.14 Zero Rated 0.00 50.14 1.46 3%
Over 30 metres in length - charge per metre
Per visit up to 24
hours 1.76 Zero Rated 0.00 1.76 1.81 Zero Rated 0.00 1.81 0.05 3%
Up to 5 metres in length Weekly 39.39 Zero Rated 0.00 39.39 40.57 Zero Rated 0.00 40.57 1.18 3%
Up to 10 metres in length Weekly 79.07 Zero Rated 0.00 79.07 81.44 Zero Rated 0.00 81.44 2.37 3%
Up to 15 metres in length Weekly 118.24 Zero Rated 0.00 118.24 121.79 Zero Rated 0.00 121.79 3.55 3%
Up to 20 metres in length Weekly 158.70 Zero Rated 0.00 158.70 163.46 Zero Rated 0.00 163.46 4.76 3%
Up to 25 metres in length Weekly 198.32 Zero Rated 0.00 198.32 204.27 Zero Rated 0.00 204.27 5.95 3%
Up to 30 metres in length Weekly 238.07 Zero Rated 0.00 238.07 245.21 Zero Rated 0.00 245.21 7.14 3%
3 - All vessels operating a scheduled ferry or pleasure
service per gross registered tonne. 0.1549 Zero Rated 0.00 0.1549 0.1595 Zero Rated 0.00 0.1595 0.00 3% Ferry Charges rounded to 4 decimal places
Unmanned Pier 0.1549 Zero Rated 0.00 0.1549 0.1595 Zero Rated 0.00 0.1595 0.00 3% Ferry Charges rounded to 4 decimal places
Laying up of ferry at a non ferry/commercial berth 0.49 Zero Rated 0.00 0.49 0.50 Zero Rated 0.00 0.50 0.01 2%
4 - Vessels regularly engaged in commercial fishing and
paying appropriate fish landing dues to Council:
Up to 10 metres in length
Per visit up to 24
hours 3.66 Zero Rated 0.00 3.66 3.77 Zero Rated 0.00 3.77 0.11 3%
Up to 15 metres in length
Per visit up to 24
hours 5.41 Zero Rated 0.00 5.41 5.57 Zero Rated 0.00 5.57 0.16 3%
Up to 20 metres in length
Per visit up to 24
hours 7.26 Zero Rated 0.00 7.26 7.48 Zero Rated 0.00 7.48 0.22 3%
Up to 25 metres in length
Per visit up to 24
hours 9.07 Zero Rated 0.00 9.07 9.34 Zero Rated 0.00 9.34 0.27 3%
Up to 30 metres in length
Per visit up to 24
hours 10.84 Zero Rated 0.00 10.84 11.17 Zero Rated 0.00 11.17 0.33 3%
Over 30 metres in length - charge per metre 0.56 Zero Rated 0.00 0.56 0.58 Zero Rated 0.00 0.58 0.02 4%
Up to 10 metres in length Weekly 18.54 Zero Rated 0.00 18.54 19.10 Zero Rated 0.00 19.10 0.56 3%
Up to 15 metres in length Weekly 27.94 Zero Rated 0.00 27.94 28.78 Zero Rated 0.00 28.78 0.84 3%
Up to 20 metres in length Weekly 37.17 Zero Rated 0.00 37.17 38.29 Zero Rated 0.00 38.29 1.12 3%
Up to 25 metres in length Weekly 46.57 Zero Rated 0.00 46.57 47.97 Zero Rated 0.00 47.97 1.40 3%
Up to 30 metres in length Weekly 55.50 Zero Rated 0.00 55.50 57.17 Zero Rated 0.00 57.17 1.67 3%
Up to 10 metres in length Annual charge 483.15 Zero Rated 0.00 483.15 497.65 Zero Rated 0.00 497.65 14.50 3%
Up to 15 metres in length Annual charge 724.80 Zero Rated 0.00 724.80 746.55 Zero Rated 0.00 746.55 21.75 3%
Up to 20 metres in length Annual charge 963.70 Zero Rated 0.00 963.70 992.60 Zero Rated 0.00 992.60 28.90 3%
Up to 25 metres in length Annual charge 1,210.75 Zero Rated 0.00 1,210.75 1,247.05 Zero Rated 0.00 1,247.05 36.30 3%
Up to 30 metres in length Annual charge 1,444.05 Zero Rated 0.00 1,444.05 1,487.35 Zero Rated 0.00 1,487.35 43.30 3%
In relation to the foregoing charges,  the relevant Executive Director, where they consider it to be in the commercial interests of the Council and after consultation with the relevant Policy Lead and the Head of Financial Services, is authorised to negotiate and
agree variations of the foregoing charges for individual users or classes of users of the facilities in respect of their respective use of the facilities and the charges as varied shall be applied to such use as the Executive Director  shall deem appropriate. In addition,
the Executive Director is authorised, after consultation with the relevant Policy Lead and the Head of Financial Services, to put in place a suitable booking procedures for harbour and airport facilities and to take into account, inter alia, the level of bookings made
by individual users or classes of users when agreeing variations of the foregoing charges with individual users or classes of users.
Ferries, Piers & Harbours Page 33
Page 114

Page 115

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
AIRFIELD CHARGES
Standard Landing Charges - Applicable
to all types of operation (including
"Touch and Go" and circuits) MTWA =
Maximum Take-Off Weight Authorised
Standard Landing Charges - up to 500kg MTWA 12.08 Standard 2.42 14.50 12.92 Standard 2.58 15.50 1.00 7% Charge for ultra lights and flexwings.
Standard Landing Charges  - 501kg to  1000kg MTWA 16.25 Standard 3.25 19.50 17.08 Standard 3.42 20.50 1.00 5%
Standard Landing Charges  - 1001kg to 1500kg MTWA 24.17 Standard 4.83 29.00 25.83 Standard 5.17 31.00 2.00 7%
Standard Landing Charges  - 1501kg to 2000kg MTWA 30.83 Standard 6.17 37.00 32.50 Standard 6.50 39.00 2.00 5%
Standard Landing Charges  - 2001kg to 2500kg MTWA 35.83 Standard 7.17 43.00 38.33 Standard 7.67 46.00 3.00 7%
Standard Landing Charges  - 2501kg to 3000kg MTWA 48.33 Standard 9.67 58.00 50.83 Standard 10.17 61.00 3.00 5%
Standard Landing Charges  - 3001kg to 3500kg MTWA 66.67 Standard 13.33 80.00 70.83 Standard 14.17 85.00 5.00 6%
Standard Landing Charges  - 3501kg to 4000kg MTWA 78.33 Standard 15.67 94.00 83.33 Standard 16.67 100.00 6.00 6%
Standard Landing Charges  - 4001kg to 4500kg MTWA 95.00 Standard 19.00 114.00 100.83 Standard 20.17 121.00 7.00 6%
Standard Landing Charges  - 4501kg to 5000kg MTWA 109.17 Standard 21.83 131.00 115.83 Standard 23.17 139.00 8.00 6%
Standard Landing Charges  - Over 5000kg MTWA - per
additional 500g or part thereof 16.25 Standard 3.25 19.50 17.08 Standard 3.42 20.50 1.00 5%
Standard Landing Fee for Coll and Colonsay 8.42 Standard 1.68 10.10 8.92 Standard 1.78 10.70 0.60 6%
2024-25 2025-26 Increase
Landing Charge Rebates - Only Available if
full payment is made prior to final departure
or approved credit facilities have been
agreed.
A) Visiting Aircraft on Training Flights First
landing - full rate, Subsequent landings -
50% discount (only applies to aircraft
operating within 15nm after 1st landing).
B) Safety-related Diversionary Landing
(AOPA Scheme). The Council is prepared to
consider requests for waiver of charges from
a General Aviation (GA) pilot who makes a
general safety-related diversionary landing.
This waiver only applies to domestic GA
traffic. Assessment of the waiver will be
carried out by the senior Airport Officer on
duty. The council reserves the right to opt
out of the AOPA scheme at any time subject
to three month's notice being given to AOPA
by the council. Eligibility for waiver will be
based on the same criteria as for a light
aircraft landing fee. i.e. private flight in
accordance with Schedule 1 of the ANO
2016.
Flying Clubs, The council may negotiate
agreements for reduced landing charges for
flights made for the purpose of the clubs at
an airport but not flights made for hire or
reward outside the normal range or scope of
club activities.  These charges will increase
on an annual basis - as a minimum - by the
agreed Council Inflation Rate.
Airfields Page 34
Page 115

Page 116

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2024-25 2025-26 Increase
Flights outside normal hours of availability - Oban 488.33 Standard 97.67 586.00 517.50 Standard 103.50 621.00 35.00 6%
Flights outside normal hours of availability - Coll and
Colonsay 245.00 Standard 49.00 294.00 260.00 Standard 52.00 312.00 18.00 6%
Flights outside normal hours of availability - Indemnity
Certificate 45.83 Standard 9.17 55.00 48.33 Standard 9.67 58.00 3.00 5%
Aircraft Parking charges (for a period of 24 hours or part
thereof) -          First 24 hours NO CHARGE 0.00 0.00 0.00 0.00 0.00 0.00 0%
No charge.
Aircraft Parking charges (for a period of 24 hours or part
thereof) Thereafter - Not exceeding 5 tonnes MTWA - charge
is per 500kg or part thereof 3.17 Standard 0.63 3.80 3.33 Standard 0.67 4.00 0.20 5%
Aircraft Parking charges (for a period of 24 hours or part
thereof) Thereafter - over 5 tonnes MTWA - charge is per
500kg or part thereof 5.42 Standard 1.08 6.50 5.75 Standard 1.15 6.90 0.40 6%
Aircraft Parking charges  - Refusal of Instruction to
move/Remove for 25-26 parked aircraft - Charge per day (plus
the standard aircraft parking charge noted above) 56.67 Standard 11.33 68.00 60.00 Standard 12.00 72.00 4.00 6%
The Council may at any time order an
aircraft operator either to move a parked
aircraft to another position or Remove for 25-
26 it from the airport. Failure to comply with
the order within the period specified in it will
render the operator liable to this charge.
Damage to Airport Property - Where an airport user damages
airport property (for which the avoidance of doubt includes, but
is not limited to, the runway, buildings, security barriers and
fences) the Council shall have the right to recharge the user for
any and all reasonable costs incurred by the Council. This
includes, but is not limited to make good materials, vehicles,
manpower, equipment etc., deemed necessary to make good
the damage. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0%
Holiday Voucher - Aircraft operators who are using Oban as a
base for their holiday can apply for a Holiday Voucher which
includes temporary indemnity for up to 2 weeks.  This is only
available for aircraft up to 2,730kg.  Aircraft operators must
present a valid copy of insurance prior to issue of the voucher. -
one week stay 7.33 Standard 1.47 8.80 7.75 Standard 1.55 9.30 0.50 6%
The application process is the same as for a
normal indemnity certificate/permit.  The cost
is £8.80 for one week.  Voucher is non-
transferable.
Weekly Parking Permit - applications may be
made to the Station Manager for the
purchase of these at a discounted rate (20%
reduction).  Arrangement and payment must
be made in advance of the aircraft parking
fee arrangement period.
Flights outside normal hours of availability as
described in the UK AIP and on the airport
website whereby the type of flight requires a
Licensed Aerodrome.  Where flights are
made outside of these hours by arrangement
with the Council, an out of hours charge will
be payable in accordance with these rates or
such rates as agreed with the Council at the
time of the arrangement.  The rates notes
are subject to a minimum charge equivalent
to 2 hours.  Note: an extension of up to one
hour immediately following normal opening
hours would incur a charge at 50% of the
normal hourly rate i.e. £293. 48hr notice
minimum for out of hours availability. 50% of
the fees applied to a request for out of hours
will be taken at the time the booking (at least
48hrs notification). This will be refunded if
cancelled before the airports normal closing
time on the day of the planned visit. Coll and
Colonsay - helicopter fire cover only.
Airfields Page 35
Page 116

Page 117

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2024-25 2025-26 Increase
Holiday Voucher - Aircraft operators who are using Oban as a
base for their holiday can apply for a Holiday Voucher which
includes temporary indemnity for up to 2 weeks.  This is only
available for aircraft up to 2,730kg.  Aircraft operators must
present a valid copy of insurance prior to issue of the voucher. -
two week stay 12.08 Standard 2.42 14.50 12.92 Standard 2.58 15.50 1.00 7%
The application process is the same as for a
normal indemnity certificate/permit.  The cost
is £14.50 for 2 weeks.  Voucher is non-
transferable.
Landing Loyalty Cards - A card with 5 sections which all get
stamped after each landing.  The first 4 are paid and the 5th
one is free and the card is complete. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0%
Cards to be produced with a unique number.
Fire Training Courses - Extinguisher Training and bespoke fire
training can all be arranged locally - phone for details. 16.25 Standard 3.25 19.50 17.08 Standard 3.42 20.50 1.00 5%
Price is per delegate.  Bespoke training
costs are based on customer requirements.
Fire Training Courses - Fire Warden Training and bespoke fire
training can all be arranged locally - phone for details. 14.17 Standard 2.83 17.00 15.00 Standard 3.00 18.00 1.00 6%
Price is per delegate.  Bespoke training
costs are based on customer requirements.
Miscellaneous - Event Bookings, Special Promotions, Business
Rates can be arranged and costs vary according to
requirements.  Business rates are subject to approval from
Strategic Transportation Manager. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0%
These require various periods of notification
and will require approval in advance.  Any
information on events or promotions will be
advertised on the airports website.
Penalties - Landing or taking off without an indemnity or
registered users certificate (Coll and Colonsay) and trespass
on the airport without approval from the Airport Authority (inc
the release of animals). 75.00 Outwith the scope 0.00 75.00 80.00
Outwith
the scope 0.00 80.00 5.00 7%
Landing/taking off without indemnity - 6
month ban and £75 to be paid within one
calendar month, £710 per month thereafter. 
Trespassing on airport grounds £710.
Penalties - Landing or taking off without an indemnity or
registered users certificate (Coll and Colonsay) and trespass
on the airport without approval from the Airport Authority (inc
the release of animals). 710.00 Outwith the scope 0.00 710.00 753.00
Outwith
the scope 0.00 753.00 43.00 6%
Landing/taking off without indemnity - 6
month ban and £75 to be paid within one
calendar month, £710 per month thereafter. 
Trespassing on airport grounds £710.
Sale of aviation fuel 0.00
Based on variable monthly rate advised by
supplier TOTAL
In relation to the foregoing charges, the relevant Executive Director, where they consider it to be in the commercial interests of the Council and after consultation with the relevant Policy Lead and the Head of Financial Services, is authorised to negotiate and agree
variations of the foregoing charges for individual users or classes of users of the facilities in respect of their respective use of the facilities and the charges as varied shall be applied to such use as the Executive Director shall deem appropriate. In addition, the
Executive Director is authorised, after consultation with the relevant Policy Lead and the Head of Financial Services, to put in place suitable booking procedures for harbour and airport facilities and to take into account, inter alia, the level of bookings made by
individual users or classes of users when agreeing variations of the foregoing charges with individual users or classes of users.
Airfields Page 36
Page 117

Page 118

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
NETWORK MANAGEMENT
Temporary Traffic Regulation Orders - Provision of Temporary
TRO 1,113.00 Outwith the Scope 0.00 1,113.00 1,180.00 Outwith the Scope 0.00 1,180.00 67.00 6%
Temporary Traffic Regulation Orders - Provision of Temporary
TRO for Annual Events (2nd year and thereafter) 558.00 Outwith the Scope 0.00 558.00 591.00 Outwith the Scope 0.00 591.00 33.00 6%
Temporary Traffic Regulation Orders - Provision of Extension
of Temporary TRO 558.00 Outwith the Scope 0.00 558.00 591.00 Outwith the Scope 0.00 591.00 33.00 6%
Temporary Traffic Regulation Orders - Provision of
Emergency Notice TRO 558.00 Outwith the Scope 0.00 558.00 591.00 Outwith the Scope 0.00 591.00 33.00 6%
Controlled Signing- Removal of Illegal Signs AT-COST Outwith the Scope 0.00 0.00 Outwith the Scope 0.00 0.00 0.00 0%
Controlled Signing - Release of impounded signs 22.00 Outwith the Scope 0.00 22.00 23.00 Outwith the Scope 0.00 23.00 1.00 5%
Scaffoldings & Hoardings - Fees for Licence 113.00 Outwith the Scope 0.00 113.00 120.00 Outwith the Scope 0.00 120.00 7.00 6% Per 4 weeks
Scaffoldings & Hoardings - Extension of the licence 48.00 Outwith the Scope 0.00 48.00 51.00 Outwith the Scope 0.00 51.00 3.00 6%
One off charge for extension + £23.00 per
week or part thereof.
Builders skips placed on the Road - consideration of Licence 35.00 Outwith the Scope 0.00 35.00 37.00 Outwith the Scope 0.00 37.00 2.00 6%
Provision of signing and guarding AT-COST + 12.5% Outwith the Scope 0.00 0.00 Outwith the Scope 0.00 0.00 0.00 0%
Permission to open up the Road by non Statutory
Organisations - Commercial 335.00 Outwith the Scope 0.00 335.00 355.00 Outwith the Scope 0.00 355.00 20.00 6%
Permission to open up the Road by non Statutory
Organisations - Residential 170.00 Outwith the Scope 0.00 170.00 180.00 Outwith the Scope 0.00 180.00 10.00 6%
Permission to erect Traffic Signals on Roads (1 Month) 118.00 Outwith the Scope 0.00 118.00 125.00 Outwith the Scope 0.00 125.00 7.00 6%
Permission to erect Traffic Signals on Roads (Up to 3 Months) 235.00 Outwith the Scope 0.00 235.00 249.00 Outwith the Scope 0.00 249.00 14.00 6%
Permission to erect Temporary Signs for Events (Up to 3
Months) 118.00 Outwith the Scope 0.00 118.00 125.00 Outwith the Scope 0.00 125.00 7.00 6%
Permission to erect Sign for New Development (Up to 12
Months) 587.00 Outwith the Scope 0.00 587.00 622.00 Outwith the Scope 0.00 622.00 35.00 6%
RCC Inspections (per RCC) 63.33 Standard 12.67 76.00 67.50 Standard 13.50 81.00 5.00 7%
£81.00 per £1,000 of Road Bond Value.
Option of Time in Line to be available.
RCC Processing (Initial Application + 1 Review) NIL Standard 0.00 0.00 Standard 0.00 0.00 0.00 0%
RCC Processing (Further Reviews)
STAFF COSTS +
ON-COSTS 0.00 Standard 0.00 0.00 Standard 0.00 0.00 0.00 0%
Staff Costs + On costs for Sub Standard
Application
Street Works Register Fines  - Fines are levied at a cost of
£120 per breach
STATUTORY
CHARGE 120.00 Outwith the Scope 0.00 120.00 120.00 Outwith the Scope 0.00 120.00 0.00 0%
This fine can be reduced to £80 if paid within 30 days
STATUTORY
CHARGE 80.00 Outwith the Scope 0.00 80.00 80.00 Outwith the Scope 0.00 80.00 0.00 0%
Road Inspections as a result of Road Openings - 1st
Inspection
STATUTORY
CHARGE 36.00 Outwith the Scope 0.00 36.00 36.00 Outwith the Scope 0.00 36.00 0.00 0%
Road Inspections as a result of Road Openings - Further
Inspections (each inspection)
STATUTORY
CHARGE 36.00 Outwith the Scope 0.00 36.00 36.00 Outwith the Scope 0.00 36.00 0.00 0%
Removal of materials from Road AT COST + 12.5% 0.00 Outwith the Scope 0.00 0.00 Outwith the Scope 0.00 0.00 0.00 0%
This is for assessment and Permission.
Not supply and erection.
Street Works Register - Fines  - Fines are
only levied against Utility Companies if they
breach the recording of road openings on
the Street Works Register, As determined
by the Roads Network and Standards
Manager.
These charges are set by Roads Authority
and Utility Committee (Scotland) under
NRSWA.
2024-25 2025-26 Increase
Plus cost of advert plus cost of traffic
management
1 - Temporary Traffic Regulation Orders
(TTRO) costs should be met in full by the
organiser promoting the event.  Event
organisers have the option to make a grant
application to the local committee for their
costs to cover the TTRO.  Alternatively
event organisers shall recover the costs of
the TTRO from the event.  Fees include
minimal administration costs from the
Council and advertising costs from local
newspapers.
2 - Cost of adverts will vary depending on
the publication in which they are placed.  In
some circumstances, events may  require to
be advertiesed in multiple publications,
where this the case the applicant will be
required to meet these costs.
For each and every opening. To be charged
at commercial rate unless advised
differently by Roads Network and Standards
Manager
Network Manage't & Public Trans Page 37
Page 118

Page 119

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2024-25 2025-26 Increase
Re-locating Street Lights or Other Street Furniture AT COST + 12.5% Standard 0.00 0.00 Standard 0.00 0.00 0.00 0%
Site Clearance after Accidents AT COST + 12.5% 0.00 Outwith the Scope 0.00 0.00 Outwith the Scope 0.00 0.00 0.00 0%
Salt Bins
AT COST +
REFILL 0.00 Standard 0.00 0.00 Standard 0.00 0.00 0.00 0%
Traffic Regulation Order to Extend a Speed Limit or Similar 1,274.00 Outwith the Scope 0.00 1,274.00 1,350.00 Outwith the Scope 0.00 1,350.00 76.00 6%
Plus Cost of Advert
Stopping up or re-determining access up to 200m long 1,593.00 Outwith the Scope 0.00 1,593.00 1,689.00 Outwith the Scope 0.00 1,689.00 96.00 6% Plus Cost of Advert
Stopping up or re-determining access over 200m long 1,993.00 Outwith the Scope 0.00 1,993.00 2,113.00 Outwith the Scope 0.00 2,113.00 120.00 6% Plus Cost of Advert
School & Public Transport
Mini Bus Hire - up to 4 hours 44.17 Standard 8.83 53.00 46.67 Standard 9.33 56.00 3.00 6%
Mini Bus Hire - per Day 88.33 Standard 17.67 106.00 93.33 Standard 18.67 112.00 6.00 6%
Privilege rides within school transport (cost per child per term) 100.00 Zero Rated 0.00 100.00 105.00 Zero Rated 0.00 105.00 5.00 5%
Privilege rides within school transport (where there are 2 or
more children, cost per child) 84.00 Zero Rated 0.00 84.00 88.00 Zero Rated 0.00 88.00 4.00 5%
Network Manage't & Public Trans Page 38
Page 119

Page 120

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
PARKING
Per 15 mins up to
4 hrs 0.25 Standard 0.05 0.30 0.25 Standard 0.05 0.30 0.00 0%
Per 30 mins up to
4 hrs 0.42 Standard 0.08 0.50 0.42 Standard 0.08 0.50 0.00 0%
Per 45 mins up to
4 hrs 0.67 Standard 0.13 0.80 0.67 Standard 0.13 0.80 0.00 0%
Per 60 mins up to
4 hrs 0.83 Standard 0.17 1.00 0.83 Standard 0.17 1.00 0.00 0%
Per hour thereafter
-4 to 10hrs 0.83 Standard 0.17 1.00 0.83 Standard 0.17 1.00 0.00 0%
Quarterly Season 115.83 Standard 23.17 139.00 115.83 Standard 23.17 139.00 0.00 0%
6 Monthly Season 215.00 Standard 43.00 258.00 215.00 Standard 43.00 258.00 0.00 0%
9 Monthly Season 309.17 Standard 61.83 371.00 309.17 Standard 61.83 371.00 0.00 0%
Annual Season 407.50 Standard 81.50 489.00 407.50 Standard 81.50 489.00 0.00 0%
All Oban, Lorn & Isle Car Parks - Oban Car Parks (Except
Corran No.1, Longsdale Road Car Park and Lochavullin Car
Park) 
Ganavan Car Park
Monthly Permit 50.00 Standard 10.00 60.00 50.00 Standard 10.00 60.00 0.00 0%
All Oban, Lorn & Isle Car Parks - Oban Car Parks (Except
Corran No.1, Longsdale Road Car Park and Lochavullin Car
Park) 
Ganavan Car Park
Weekly Permit 25.00 Standard 5.00 30.00 25.00 Standard 5.00 30.00 0.00 0%
Per hour 0.83 Standard 0.17 1.00 0.83 Standard 0.17 1.00 0.00 0%
Per day 7.50 Standard 1.50 9.00 7.50 Standard 1.50 9.00 0.00 0%
Per 15 mins -
Maximum 4 hrs 0.25 Standard 0.05 0.30 0.25 Standard 0.05 0.30 0.00 0%
Per 30 mins -
Maximum 4 hours 0.42 Standard 0.08 0.50 0.42 Standard 0.08 0.50 0.00 0%
Per 45 mins -
Maximum 4 hours 0.67 Standard 0.13 0.80 0.67 Standard 0.13 0.80 0.00 0%
Per 60 mins -
Maximum 4 hours 0.83 Standard 0.17 1.00 0.83 Standard 0.17 1.00 0.00 0%
Per 15 mins 0.25 Standard 0.05 0.30 0.25 Standard 0.05 0.30 0.00 0%
Per 30 mins 0.42 Standard 0.08 0.50 0.42 Standard 0.08 0.50 0.00 0%
Per 45 mins 0.67 Standard 0.13 0.80 0.67 Standard 0.13 0.80 0.00 0%
Per 60 mins 0.83 Standard 0.17 1.00 0.83 Standard 0.17 1.00 0.00 0%
0 to 8 hours 0.92 Standard 0.18 1.10 0.92 Standard 0.18 1.10 0.00 0%
8 to 24 hours 8.33 Standard 1.67 10.00 8.33 Standard 1.67 10.00 0.00 0%
Per 15 mins - up
to 4 hrs 0.25 Standard 0.05 0.30 0.25 Standard 0.05 0.30 0.00 0%
Per 30 mins - up
to 4 hours 0.42 Standard 0.08 0.50 0.42 Standard 0.08 0.50 0.00 0%
Per 45 mins - up
to 4 hours 24.00 Standard 0.13 0.80 0.67 Standard 0.13 0.80 0.00 0%
Per 60 mins - up
to 4 hours 0.83 Standard 0.17 1.00 0.83 Standard 0.17 1.00 0.00 0%
2024-25 2025-26 Increase
Oban Car Parks (Except Corran No.1, Longsdale Road Car
Park and Lochavullin Car Park) 
Ganavan Car Park
Helensburgh Including Pier Area A,
Dunoon
Rothesay 
Luss
Arrochar Glenloin No.1 and No.2
Two weeks suspension of charges prior to
Christmas
Helensburgh - Sinclair Street
First 2 hours free, 2 hours thereafter can be paid for up to a
maximum of 4 hours total.  No return within 24 hours.
Oban – Longsdale Road Car Park and Lochavullin Car Park
First 2 hours free
Commercial Parking
Helensburgh Pier Area B Car Park
Lochavullin and Longsdale Coach and Lorry Parks - Oban
Lochgilphead Lorne Street Coach and Lorry Park
Seasonal Car Parks                                                                                                           
Corran No.1                                                                                
Inveraray                                                                                                        
Parking Page 39
Page 120

Page 121

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2024-25 2025-26 Increase
Per hour thereafter
-4 to 10hrs 0.83 Standard 0.17 1.00 0.83 Standard 0.17 1.00 0.00 0%
Seasonal Car Parks - Permits Seasonal Period 90.00 Standard 18.00 108.00 90.00 Standard 18.00 108.00 0.00 0%
Statutory Charge
Paid within 14
days 50.00 Zero Rated 0.00 50.00 50.00 Zero Rated 0.00 50.00 0.00 0%
Statutory Charge
Paid after 14 days 100.00 Zero Rated 0.00 100.00 100.00 Zero Rated 0.00 100.00 0.00 0%
On Street Parking - Inner Zone Oban
First 30 minutes free at the following:  Argyll Square, Queens
Park Place, William Street, Corran Esplanade, George Street. 
Maximum stay of 2 hours total.
Per 40 mins -
Limited to 2 hours
maximum 0.80 Outwith the Scope 0.00 0.80 0.80 Outwith the Scope 0.00 0.80 0.00 0%
On Street Parking - Outer Zone Oban
Maximum stay 4 hours expect Gallanach Road and Ganavan
Road which are all day parking.
Per 40 mins -
Limited to 4 hours
maximum 0.80 Outwith the Scope 0.00 0.80 0.80 Outwith the Scope 0.00 0.80 0.00 0%
Annual Charge 98.00 Outwith the Scope 0.00 98.00 98.00 Outwith the Scope 0.00 98.00 0.00 0%
Quarterly Charge 36.00 Outwith the Scope 0.00 36.00 36.00 Outwith the Scope 0.00 36.00 0.00 0%
Staff Permits - Municipal Buildings - Oban Annual 81.67 Standard 16.33 98.00 81.67 Standard 16.33 98.00 0.00 0%
ELECTRIC VEHICLES CHARGING
Connection fee 1.67 Standard 0.33 2.00 1.75 Standard 0.35 2.10 0.10 5%
Connection fee covers management costs
e.g. admin, banking fees, merchant fees etc.
Charge Per Kwh 0.38 Standard 0.08 0.45 0.58 Standard 0.12 0.70 0.25 56%
1st Hour 30.00 Outwith the Scope 0.00 30.00 30.00 Outwith the Scope 0.00 30.00 0.00 0%
10 min grace period then £30 charge up to
one hour overstay
2nd Hour 30.00 Outwith the Scope 0.00 30.00 30.00 Outwith the Scope 0.00 30.00 0.00 0%
Additional £30 for overstaying a second
hour. Penalty capped at 2 hours [£60]
Residents Permit
PCNs are statutory charges and the level is
set by the Scottish Government
Overstay Penalty Charges
Seasonal Car Parks                                                                                                           
Corran No.1                                                                                
Inveraray                                                                                                        
Penalty Charge Notices
Parking Page 40
Page 121

Page 122

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
Photocopying/Printing A4 (black & white) per side 0.20 Standard 0.04 0.24 0.25 Standard 0.05 0.31 0.07 27% Standard Rate across Council
Photocopying/Printing A4 (coloured) per side 0.34 Standard 0.07 0.41 0.43 Standard 0.02 0.46 0.05 11% Standard Rate across Council
Photocopying/Printing - Colour - per side (A3) 0.69 Standard 0.14 0.83 0.88 Standard 0.00 0.88 0.05 6% Standard Rate across Council
Photocopying/Printing - Black and White - per side (A3) 0.34 Standard 0.07 0.41 0.42 Standard 0.00 0.42 0.01 3% Standard Rate across Council
PRODUCTION GENRE Classification (Budget)
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
FEATURE FILM
Major US: eg Bond, Jurassic World High End (£100m+) 1,593.33 Standard 318.67 1,912.00 1,689.17 Standard 337.83 2,027.00 115.00 6% Daily charge
Large US: eg Les Miserable Medium High (£60m+) 1,215.83 Standard 243.17 1,459.00 1,289.17 Standard 257.83 1,547.00 88.00 6% Daily charge
Major UK/US Indie: eg Rush, Theory of Everything Medium (£20m+) 834.17 Standard 166.83 1,001.00 884.17 Standard 176.83 1,061.00 60.00 6% Daily charge
Medium: eg The Worlds End Medium/Low (£10m+) 606.67 Standard 121.33 728.00 643.33 Standard 128.67 772.00 44.00 6% Daily charge
Low: eg 71, Alan Partridge, Alpha Papa Low (£1.5m+) 303.33 Standard 60.67 364.00 321.67 Standard 64.33 386.00 22.00 6% Daily charge
Micro: eg IFeatures Micro (<1.5M) 63.33 Standard 12.67 76.00 67.50 Standard 13.50 81.00 5.00 7% Daily charge
TELEVISION
Domestic/International receiving Tax Relief: eg Penny
Dreadful, The Game High End Tax Relief 834.17 Standard 166.83 1,001.00 884.17 Standard 176.83 1,061.00 60.00 6%
Daily charge
Period Drama: eg Call the Midwife, The Village High End Domestic 682.50 Standard 136.50 819.00 723.33 Standard 144.67 868.00 49.00 6% Daily charge
Soap/Drama Series: eg Sherlock, Corrie, EastEnders Medium 606.67 Standard 121.33 728.00 643.33 Standard 128.67 772.00 44.00 6% Daily charge
Sitcom/Comedy/Drama: eg Family Tree, My Mad Fat Diary Medium 379.17 Standard 75.83 455.00 401.67 Standard 80.33 482.00 27.00 6%
Daily charge
Pilot/Light Entertainment/High End Documentaries/Factual: eg
Springwatch, Great British Bake Off Low
133.33 Standard 26.67 160.00 141.67 Standard 28.33 170.00 10.00 6%
Daily charge
Low-end Doc/Factual: eg Great Railway Journeys Low 63.33 Standard 12.67 76.00 67.50 Standard 13.50 81.00 5.00 7% Daily charge
COMMERCIALS
High Profile: eg :McDonalds, Lagavulin Whisky (International) High (> £1M) 760.00 Standard 152.00 912.00 805.83 Standard 161.17 967.00 55.00 6%
Daily charge
Medium Profile: eg: Ford, Skoda, Peugeot (National) Medium (< £1M) 455.00 Standard 91.00 546.00 482.50 Standard 96.50 579.00 33.00 6% Daily charge
Low Profile: eg: Short promos (Regional) Low (< £250k) 133.33 Standard 26.67 160.00 141.67 Standard 28.33 170.00 10.00 6% Daily charge
MUSIC VIDEOS
High Profile: eg Florence and the Machine High 113.33 Standard 22.67 136.00 120.00 Standard 24.00 144.00 8.00 6% Daily charge
Low Profile: eg Corporate etc. Low 63.33 Standard 12.67 76.00 67.50 Standard 13.50 81.00 5.00 7% Daily charge
2025-26 Increase2024-25
COUNCIL WIDE CHARGES 2024-25 Increase2025-26
FILMING
General Page 41
Page 122

Page 123

ARGYLL AND BUTE COUNCIL
FINANCIAL SERVICES
COUNCIL
27 FEBRUARY 2025
FINANCIAL RISKS ANALYSIS 2025-26  
1 EXECUTIVE SUMMARY 
1.1 The main purpose of this report is to provide a summary of the key financial risks
facing the council.   
1.2 A number of council wide financial risks, both revenue and capital, have been
identified, in addition to specific departmental or service risks.  For each
departmental risk, the potential annual financial impact has been quantified, and
the likelihood of the risk materialising assessed, based on a standard risk matrix. 
1.3  There are currently 7 council wide revenue risks identified for 2025-26, with a
potential annual value totalling £8.1m, and with varying degrees of likelihood. 
1.4 There are currently 30 departmental risks, with a potential annual value totalling
£3.2m, of which 4 are categorised as ‘Likely’.   
1.5 Financial risks are monitored and reviewed on an ongoing basis, with actions put
in place to continue to mitigate or manage these risks.     
Page 123 Agenda Item 2c

Page 124

ARGYLL AND BUTE COUNCIL
FINANCIAL SERVICES
COUNCIL
27 FEBRUARY 2025
FINANCIAL RISKS ANALYSIS 2025-26  
2. INTRODUCTION 
2.1 This report outlines the process and approach to financial risk assessment and
provides details of the currently known key financial risks facing the council in
2025-26. 
3 DETAIL 
3.1 Introduction 
3.1.1 The council is currently in a period of significant financial challenge.  In developing
its budget to address both funding, and cost and demand pressures,
consideration is given to financial risk.  However, both existing and new or
emerging financial risks require to be monitored and reviewed on an ongoing
basis throughout the year, with actions put in place to mitigate or manage these
risks.  Risks that cannot be mitigated or managed may have a detrimental impact
on the financial position of the council. 
3.1.2 There are a number of risks that may impact income or expenditure across the
entire council.  These are identified as council wide risks.  In addition, specific
financial risks impacting each department or service of the council have been
considered.  These are identified as departmental/service risks.  A de-minimis 
level of £50k has been applied.  Risks with a potential annual risk value below this
level are expected to be managed within the relevant overall service budget. 
3.1.3 For each risk, the potential annual financial impact has been quantified and the
likelihood assessed based on the following standard risk matrix: 
1 – Remote
2 – Unlikely
3 – Possible
4 – Likely
5 – Almost Certain 
3.2 
3.2.1
Council Wide Risks 
General 
There is a risk of further severe weather incidents, requiring both revenue and
capital expenditure to be incurred.  Whilst there may be additional funding
available through the Bellwin Scheme, this is limited to eligible revenue
expenditure and there is an assumption that local authorities will budget to cover
a proportion of the costs of emergency incidents from within internal resources. 
The threshold over and above where Councils’ can claim for eligible expenditure
Page 124

Page 125

is 0.2% of a local authority's budgeted net revenue expenditure and, for 2024-
2025, this equates to £0.558m for Argyll and Bute Council.  There is no provision
for additional costs in this respect within either the 2025-26 Revenue Budget or
the 2025-28 Capital Plan.  The potential additional costs are difficult to estimate
by their very nature, however, a potential risk value of £2m is deemed to be
reasonable. 
Revenue 
3.2.2 The 2025-26 budget includes a 3% pay award assumption across all workforce
categories, at all grades.  This is based on the Public Sector Pay Policy of 9%
over the 3 years 2025-26 to 2027-28 and whilst the increase could vary across
the years, the envelope of 9% has been profiled within the budget at 3% each
year.  Pay negotiations have still to commence.  In 2024-25, the pay award was
an average of 3.6% for SJC and Chief Officers, and 4.27% for teachers.  The
Scottish Government provided additional funding towards the cost of increases
above 3.2%.  There is a risk that the agreed pay award may vary from the budget
assumption, which may require to be funded by the council.  A potential annual
risk value equivalent to 1% of the annual pay budget for council employees,
including Social Work employees is deemed reasonable.  This equates to £1.8m.
It is hoped that any award above 3% would be covered by additional Scottish
Government funding.  This position will be monitored and reviewed on an ongoing
basis throughout the year.   
3.2.3 Whilst the 2025-26 approved budget provides for inflationary increases, there is a
risk of continued volatility in utilities pricing and demand can also be subject to
unpredictable weather extremes.  A potential annual risk value equivalent to 5%
of the annual utilities budget provision is deemed reasonable.  This equates to
£0.4m. 
3.2.4  In respect of the Health and Social Care Partnership, it is the responsibility of the
Chief Officer and Chief Financial Officer to manage the HSCP financial position. 
If an overspend is forecast, a budget recovery plan will be prepared and
submitted to the IJB, Argyll and Bute Council and NHS Highland.  Where recovery
plans are unsuccessful and an overspend occurs at the financial year end, and
there are insufficient reserves to meet the overspend, then the partners will be
required to make additional payments to the HSCP.  The council would have to
contribute towards any overspend related to Social Work.  Whilst any additional
payments by the council and NHS Highland will be deducted from future years
funding, there is a risk that the council may require to make an additional
unbudgeted contribution to the HSCP during the year.  The financial situation
facing Social Work is extremely challenging due to increase in demand,
complexity of cases, increasing costs and difficulty recruiting permanent staff and
therefore having to rely on agency staff, at an additional cost.  At the time of
writing this report, the forecast Social Work budget for 2025-26 has a £1.3m
funding gap, after accounting for additional contributions from the council in
respect of ENICs and pay award budget assumptions.  There also is a risk in
respect of commissioned providers ENICs costs being passed on, which equates
to an estimated additional cost of around £1.3m.  At this stage, the overall
Page 125

Page 126

potential annual risk value has been quantified at £2.6m but it is hoped that the
level of risk could be reduced prior to the IJB setting their budget. 
3.2.5 The estimated level of Council Tax income is based on current and forecast Band
D equivalents, and reflects our expected collection rates, based on historical data. 
A potential annual risk value equivalent to 1% of the annual Council Tax income
budget is deemed reasonable.  This equates to £0.7m. 
3.2.6 
3.2.7 
The 2025-26 Budget Pack includes both Operational/Management and Policy
savings options, totalling £3.093m.  Whilst the council has a good track record in
delivering savings, there is a risk that this target will not be fully delivered.  A
potential annual risk value equivalent to a 10% shortfall in the annual savings
target is deemed reasonable.  This equates to £0.3m. 
There is an ongoing requirement to fund unavoidable inflationary cost increases
across a number of areas such as, food and fuel.  The Bank of England is
currently forecasting that inflation will continue to fall throughout the year, towards
the 2% government target.  This position will continue to be closely monitored,
with financial forecasts updated to reflect information available on an ongoing
basis.  The annual budget is underpinned by inflationary assumptions, however,
there is a risk that inflationary impacts have been under-estimated. A potential
annual risk value equivalent to 10% of the inflationary assumptions in respect of
relevant non-pay budgets is deemed reasonable.  This equates to £0.3m. 
Capital 
3.2.8 The Finance Circular received on 12 December 2024 provided details of
government grant funding for 2025-26.  There is therefore a degree of certainty in
respect of General Capital Grant and available specific capital grant funding.  At
the time of writing, the council’s share of an additional £40m Climate Emergency
Fund, to be paid as General Capital Grant has still to be confirmed.  The Capital
Plan has assumed additional funding of £0.964m in this respect.  Any variation in
the final allocation from this assumption will require to be managed within the
overall Capital Plan resources.   
3.2.9  The funding framework for the approved Capital Plan includes capital receipts
from asset sales, estimated at £0.750m in 2025-26 and £1.750m over the 3 years
2025-28.  This is based on an assessment provided by the Estates Team in
January 2025, however, is subject to changing market conditions.  The level of
receipts that may reasonably be achieved will be kept under review, to reflect
changing market conditions and due diligence undertaken on asset condition. 
Any variation from this assumption will require to be managed within the overall
Capital Plan resources. It is generally the case that the capital programme
experiences slippage throughout the year and as such, this risk is expected to be
manageable.   
3.2.10 The capital programme continues to see significant price increases, as well as
disruptions to the supply chain and longer lead in times, due to the impact of
world events (Covid pandemic, UK exit from EU, Russian invasion of Ukraine) on
the global economy. Additional funding of £11m, made available to manage these
Page 126

Page 127

impacts to date, has now been fully allocated.  There are likely to be other
significant cost pressures in respect of projects, where contracts have yet to be
entered into, which are not quantifiable, at this stage.  It will be challenging to
manage these impacts within available resources and target completion
timescales. Actions to manage financial risk within available resources may
include re-profiling, project redesign, re-engineering or curtailment, and the re-
prioritisation of uncommitted resources across the programme. 
3.2.11 
3.2.12
The Capital Plan monitoring report, as of 31 December 2024, outlines a forecast
overspend on the 2024-27 Capital Plan of £0.117m.  Members will be requested
to approve additional resources in this respect, as part of the 2025-26 budget
process.   
The council wide risks are summarised within the following table: 
Description  Likelihood
Assessed
Financial
Impact
£m
Unbudgeted Severe Weather costs 3 2.0
Pay Award exceeding 3% 3 1.8
Energy costs increase by 5% greater than
budgeted
3 0.4
IJB refer to Council for additional funding to
deliver social work services 
3 2.6
1% variation in Council Tax Income 2 0.7
10% shortfall on Savings delivery 2 0.3
10% variation on General Inflation 3 0.3
Total     8.1 
3.3 Departmental/Service Risks 
3.3.1 It should be noted that the council has a good track record of delivering services
within budget, however, there are specific financial risks impacting each council
department or service.  The detail of each departmental financial risk is included
within Appendix 1.  The following table provides a summary of the number of risks
within each department, across each likelihood category, together with the
potential annual financial impact value. 
Department 1 - Remote 2 - Unlikely 3 - Possible 4 - Likely 5 - Almost
Certain Total
No £000 No £000 No £000 No £000 No £000 No £000
Chief
Executive's
Unit
0 0 0 0 0 0 0 0 0 0 0 0
Executive
Director
Douglas
Hendry
0 0 5 360 8 575 2 360 0 0 15 1,295
Page 127

Page 128

Executive
Director Kirsty
Flanagan
4 375 2 250 7 1,065 2 250 0 0 15 1,940
Total 4 375 7 610 15 1,640 4 610 0 0 30 3,235 
3.3.2  The current top 4 risks in terms of the financial impact are noted in the table below. 
SERVICE  TITLE OF
RISK 
DESCRIPTION OF RISK LIKELIHOOD
FINANCIAL
IMPACT
£000
Council Wide
- Commercial
Services
Council Wide
Central
Repairs
Increased demands on central
repair budgets (CRA) due to a
decrease in Capital funding,
increase in statutory and
emergency repairs and
increases in supplier/contractor
charges.  This impacts on all
departments of the Council
with a Central Repairs Budget.
4 300
Roads and
Infrastructure
Services
Roads
Maintenance
- Roads
Network
Adverse weather conditions
result in deterioration of the
road network necessitating
greater spend on repair of
defects.
3 230
Roads and
Infrastructure
Services
Car Parking
Income
Reduced number of visitors to
the area and use of Council
owned car parks resulting in a
reduction in income.
3 200
Roads and
Infrastructure
Services
Piers &
Harbours
Income
Changes to ferry services
resulting in reduced berthing
and passenger income.
3 200 
3.3.3 The risks that are categorised as ‘likely’ are outlined in the table below. 
SERVICE  TITLE OF
RISK 
DESCRIPTION OF RISK LIKELIHOOD
FINANCIAL
IMPACT
£000
Council Wide
- Commercial
Services
Council Wide
Central
Repairs
Increased demands on central
repair budgets (CRA) due to a
decrease in Capital funding,
increase in statutory and
emergency repairs and
increases in supplier/contractor
charges.  This impacts on all
departments of the council with
a Central Repairs Budget.
4 300
Development
and
Economic
Growth
Homelessne
ss
Temporary
Accommodat
ion Income
Unpredictable number of
Homeless applications.
Inability to recover rent. 
Increase costs of property
maintenance and tenancy
change over.
4 150
Roads and
Infrastructure
Services
Fleet
Maintenance
Increased costs to maintain
internal fleet due to inflationary
increases on vehicles parts.
4 100
Page 128

Page 129

Legal and
Regulatory
Support
Elections More than 1 by-election
required outwith standard
election cycle.
4 60 
3.4 Monitoring of Financial Risks 
3.4.1 Financial risks are monitored and reviewed on an ongoing basis, with actions put
in place to continue to mitigate or manage these risks.  The updated position on
financial risks will continue to be regularly reported to Policy and Resources
Committee.     
3.5 Potential Future Risks 
3.5.1 There is a risk that changes to government policy may require to be implemented
by the council, with associated unbudgeted costs not fully met by additional
funding.  For example, an extension to funded childcare to all 1 and 2 year olds
across Scotland. 
3.5.2 The Council’s bid to the Scottish Governments Learning Estate Investment
Programme (LEIP) for funding for a new school campus on Mull was successful
and a report was considered by Council on 24 April 2024.  Approval was granted
to utilise £5m of £9m previously earmarked funds to develop the Business Case. 
The Scottish Government will fund up to 50% of eligible costs and the estimated
cost is £43m, with £41m deemed eligible, however these are just estimates at this
stage.  The Council will need to make a decision as to whether to proceed once
the project has been tendered.  There is a risk that the cost will be higher than
estimated but no estimates have been built into the capital plan at this stage.   
3.5.3 Looking ahead to 2026/27, as part of the regular three-year review of the rateable
value of commercial properties across Scotland for non-domestic rates charges,
there will be a full revaluation of all of the Council’s properties by the local
Assessor’s Office which is likely to result in an increase in the Council’s non-
domestic rates charges. At this point, pending the completion of the reviews and
recognising that there is no reliable historic trend data which could be used to
forecast the outcome, the extent of the likely increase is extremely uncertain. In
addition, the Council is awaiting the outcome of circa 60 appeals lodged in
respect of the 2023/24 revaluation, the outcomes of which could have a significant
impact on the Council’s future non-domestic rates liability. 
4 CONCLUSION 
4.1 This report summarises the known key financial risks facing the council in 2025-
26.  There are 7 council wide risks and 30 departmental risks identified, with 4
categorised as ‘Likely’.  These risks are monitored and reviewed on an ongoing
basis, with actions put in place to continue to manage or mitigate the risks.   
5 IMPLICATIONS 
5.1 Policy None
5.2 Financial  Outlines the potential annual value of financial risks.   
Page 129

Page 130

5.3 Legal  None
5.4 HR  None
5.5 Fairer Scotland Duty  
5.5.1 Equalities None
5.5.2 Socio-Economic Duty None
5.5.3 Islands Duty None
5.6 Climate Change None
5.7 Risk Provides details of financial risks.
5.8 Customer Service None 
5.9 The Rights of the Child
(UNCRC)
None 
Kirsty Flanagan
Executive Director/Section 95 Officer
13 February 2025 
Councillor Ross Moreland, Policy Lead for Finance and Commercial Services 
APPENDICES
Appendix 1 – Detail of Department/Service financial risks. 
For further information contact Carolyn Earl, Acting Head of Financial Services
carolyn.earl@argyll-bute.gov.uk
Page 130

Page 131

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS 2025-26
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
Executive Director
Douglas Hendry
Commercial Services Catering Costs - Provision of
Meals to Early Years Children
The Children and Young People (Scotland) Act placed duties
on Councils to provide meals in an Early Years setting to
entitled children where sessions span over lunch time.  The
total quantum of grant funding is reducing and may not be
sufficient to fund the additional costs depending on uptake
and the additional costs to support the meal provision in
partner provider settings.
Joint strategy with procurement colleagues to reduce
potential impact of supplier charges.  Control food
wastage/portion controls.
2 100
Executive Director
Douglas Hendry
Commercial Services Catering Purchases Increased supplier charges and higher than average inflation
on food costs.  In addition to this the Scottish Government
reviewed the regulations that govern the food and drinks
provided in schools and implemented revised regulations. 
The revised standards focus on reducing sugar, reducing red
processed meat and increasing fibre. Thus far, there has
been an increase in costs in produce and a reduction in
demand for school meals.
Joint strategy with procurement colleagues to reduce
potential impact of supplier charges.  Control food
wastage/portion controls; introduction of online ordering
to help manage food waste. Analysis and regular review
of menu choices.
2 100
Executive Director
Douglas Hendry
Commercial Services Rental Income from Properties Due to current economic climate, there may be reduced
ability to recover rental income from leased properties or
place suitable tenants in properties as leases come to an end.
Management of leasehold properties by Estates team,
any issues with debt recovery being dealt with in line with
Council debt recovery policy.
2 60
Executive Director
Douglas Hendry
Commercial Services Surplus Properties Ongoing market difficulties lead to increased numbers of
surplus properties, in addition, as Our Modern Workspace
Project gains traction more properties will become surplus to
operational requirements. There are residual running costs
associated with all surplus properties.
One Council property team in place who will monitor
market conditions and work with prospective tenants/
purchasers to let/sell surplus properties.
3 50
Executive Director
Douglas Hendry
Commercial Services Leisure Service Level
Agreements
Increase in RPI and/or other running costs (eg utilities,
payroll etc) resulting in requests for additional funding.
Monitoring annual alteration to contract RPI rate,
communication with service providers and mitigation
through financial forecasting and review of existing
budget.
3 50
Executive Director
Douglas Hendry
Commercial Services LiveArgyll Service Fee Inability to deliver required services within available budget
resources (e,g. pay award and ENICs budget pressures),
resulting in increased service fee request.
Communication with service providers and mitigation
through monitoring and review of budget monitoring
information and forecasts.
3 100
Executive Director
Douglas Hendry
Council Wide - Commercial
Services
Council Wide Central Repairs Increased demands on central repair budgets (CRA) due to a
decrease in Capital funding, increase in statutory and
emergency repairs and increases in supplier/contractor
charges.  This impacts on all departments of the Council with
a Central Repairs Budget.
Joint strategy with procurement colleagues to reduce
potential impact of supplier/contractor charges. Close
monitoring of central repairs budgets and commitments
and instructing only statutory tests/inspections and
essential repairs.
4 300
2025-26
Page 131

Page 132

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS 2025-26
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
2025-26
Executive Director
Douglas Hendry
Education ASN Support Demand for ASN support continues to increase. Scottish
Government statistics suggest a 3% year on year increase,
resulting in an additional resource requirement, particularly
where gaps in our enhanced provision exist. The medium-
term detriments on the development of young children
which occurred as a consequence of service closures during
the COVID pandemic have increased demands on the service
as children require additional support to catch up.  The
Additional Support for Learning National Implementation
plan continues to inform our strategic direction in line with
the Angela Morgan Review.
The Scottish Government has committed to provide
additional resource for ASL from 2025-26, to allow
Council to take forward the aims and objectives of
Additional Support for Learning Programme.  In addition
to this the Service is currently looking at alternative
options for service delivery to mitigate budget pressures
and are considering a formula-based approach from
August 2025. Both above actions have allowed the Service
to reduce the likelihood as well as the value of the risk.  
2 50
Executive Director
Douglas Hendry
Education Pre-Five Units - retention of
partner providers
Failure in the commissioning or retention of pre-five partner
provider units to deliver 1140 hours would result in an
increased pressure on the Council to deliver the service.
Annual financial appraisal; Support network; Short-term
cash injections.
3 100
Executive Director
Douglas Hendry
Education Legislative Requirements -
Education (Scotland) Act
The Education (Scotland) Act 2000 requires Councils to
undertake assessments of the need for the provision of
Gaelic Medium Primary Education (GMPE) and the duty to
support and promote Gaelic Education. This may lead to
additional staffing requirements depending upon the
demand for Gaelic from parents.
Continuous monitoring and review of the service model
and resources available within budget.
3 50
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Contract RPI for NPDO and Hub
Schools
Increase in RPI would result in higher costs. Monitoring annual alteration to contract RPI rate and
mitigation through financial forecasting and review of
existing budget.
3 100
Executive Director
Douglas Hendry
Legal and Regulatory
Support
NPDO - Increase in insurance
costs within NPDO Schools
Increase in insurance costs as a result of the long-term
effects of Covid-19 on the insurance market and flood claims.
Monitoring annual alteration to contract insurance rate
and mitigation through financial forecasting and review of
existing budget.
3 75
Page 132

Page 133

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS 2025-26
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
2025-26
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Elections By-election(s) required outwith standard election cycle. Outwith direct management control. 4 60
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Legal Services - Litigation Increased number of litigation cases. Ensure Legal Services are gateway to access all legal
advice and that advice is sought at earliest opportunity.
3 50
Executive Director
Douglas Hendry
Legal and Regulatory
Support
NPDO/Hub DBFM contract
management efficiencies
Reduction in ability to generate contract management
efficiencies.
Monitoring annual efficiencies generated and mitigation
through robust contract management and application of
contract specifications / requirements.
2 50
Executive Director
Kirsty Flanagan
Customer Support Services Software Licences Potential risk of being under licensed for software which will
be identified via software audits which would incur additional
costs.
ICT security and compliance officer in post and duties
include review of systems to ensure fully licenced. 
2 100
Executive Director
Kirsty Flanagan
Development and Economic
Growth
Homelessness Temporary
Accommodation Income
Unpredictable number of Homeless applications. Inability to
recover rent.  Increase costs of property maintenance and
tenancy change over.
Provision of Housing Options information and advice
service to minimise number of applicants proceeding to
full homeless application. Implementation of Rapid
Rehousing Plan.
4 150
Executive Director
Kirsty Flanagan
Development and Economic
Growth
Dangerous Buildings
Interventions
Building Standards having to deal with an increasing level of
dangerous building work which has significant financial
implications for the Council.
Monitor activity and seek to recover costs from the
owner(s) of the affected buildings.
3 100
Executive Director
Kirsty Flanagan
Development and Economic
Growth
Planning Fee Penalties Potential that the Scottish Government may apply sanction
penalties due to poor performance by the Planning
Authority. The Scottish Government has recently appointed a
national Planning Performance Champion however the detail
of how this role intends to incentivise improvement/penalise
poor performance at a local authority level remains unclear
at this time
Maintain high levels of performance as articulated by
performance markers detailed in Planning Performance
Framework annual report.
1 100
Executive Director
Kirsty Flanagan
Development and Economic
Growth
Planning Fee Shortfalls Planning fees subject to impact of wider economic position
on building activity.  There is a risk that planning fee income
will be adversely impacted by wider economic challenges,
leading to revenue budget pressures.
Will continue to closely monitor Development
Management income and expenditure and investigate
further income generation streams.
1 100
Page 133

Page 134

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS 2025-26
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
2025-26
Executive Director
Kirsty Flanagan
Development and Economic
Growth
Building Warrant Fee Shortfalls Building Warrant fees subject to impact of wider economic
position on building activity.  There is a risk that planning fee
income will be adversely impacted by wider economic
challenges, leading to revenue budget pressures.
Continue to closely monitor Building Standards income
and expenditure and investigate further income
generation streams.
1 50
Executive Director
Kirsty Flanagan
Financial Services Council Tax Debt Collection
Recovery
Recovery of debt becomes more difficult to pursue in the
current economic climate.  This is in relation to historical
debt that has accumulated over many years therefore any
adverse collection rates will impact on the year end bad debt
provision.
Robust monitoring of arrangements with debt collection
agency and performance against target collection rates.
Also enhanced data sharing with HMRC will further
increase recovery opportunities.
2 150
Executive Director
Kirsty Flanagan
Financial Services Housing Benefit Subsidy Loss of Housing Benefit Subsidy due to exceeding LA error
threshold.
Processes in place for handling of claims accurately and
efficiently.
1 125
Executive Director
Kirsty Flanagan
Financial Services Sundry Debt Recovery Recovery of debt becomes more difficult to pursue in the
current economic climate. 
Additional staff are being put in place in the Sundry Debt
Team who will work jointly with Legal Services to enhance
the robustness of the Council's debt recovery processes.
3 85
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Roads Maintenance - Roads
Network
Adverse weather conditions result in deterioration of the
road network necessitating greater spend on repair of
defects.
Manage maintenance budgets to ensure that spend is
prioritised to deal with safety defects.
3 230
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Car Parking Income Reduced number of visitors to the area and use of Council
owned car parks resulting in a reduction in income.
Closely monitor income levels throughout the year,
especially in high visitor seasons.
3 200
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Piers & Harbours Income Changes to ferry services resulting in reduced berthing and
passenger income.
Closely monitor passenger number information coming
from CalMac to identify any emerging trends in relation to
reducing passenger numbers.
3 200
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Winter Maintenance Adverse weather conditions which require greater than
budgeted number of gritting runs.
Monitor weather conditions and apply gritting policy to
minimise costs.
3 150
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Street Lighting Age of lighting stock requires greater maintenance as health
and safety becomes a consideration.
Manage maintenance budgets to ensure that spend is
prioritised to deal with safety defects.
3 100
Executive Director
Kirsty Flanagan
Roads and Infrastructure
Services
Fleet Maintenance Increased costs to maintain internal fleet due to inflationary
increases on vehicle parts.
Review of fleet underway to determine where reductions
could possibly be made.
4 100
30 3,235
Page 134

Page 135

ARGYLL AND BUTE COUNCIL COUNCIL
FINANCIAL SERVICES 27 FEBRUARY 2025
RESERVES AND BALANCES – UPDATED FOR BUDGET PACK 2025-26 
1 EXECUTIVE SUMMARY 
1.1 The main purpose of this report is to advise Members of the overall level of
reserves held by the Council as well as providing detail on the monitoring of the
earmarked balances held within the General Fund.   
1.2 The Council has a total of £400.319m unusable reserves that are not backed with
resources.  They are required purely for accounting purposes. 
1.3 At 31 March 2024 the Council had a total of £121.701m usable reserves.  Of this: 
• £2.763m related to the Repairs and Renewals Fund
• £3.197m related to Capital Funds
• £115.741m was held in the General Fund with £107.443m of this balance
earmarked for specific purposes. 
1.4 The Council’s General Fund contingency remains at 2% of net expenditure.  This
monetary level has been adjusted to take account of the revised net revenue
expenditure proposed for 2025-26.  The revised contingency of 2% of net
expenditure amounts to £6.520m.   
1.5 The estimated unallocated General Fund at the end of the financial year is a deficit
of £0.283m.  It may be that this position is improved if the forecast outturn is better
than estimate, however, if the position remains then the Council will be using the
General Fund contingency and a recovery plan will need to be put in place in order
to bring the continency level back to the 2% agreed policy.   
1.6 Assessing the adequacy of reserves should take account of the strategic,
operational and financial risks facing the Council and should consider both internal
and external factors.  There are 20 categories included in the risk analysis and 3
have been assessed as low, 4 low/medium, 6 medium and 7 medium/high.  The
medium/high risks are in respect of council wide cost risks, funding risks, inflation
rates, world events, general financial climate, Health and Social care partnership,
and the impact of climate change.   
Page 135 Agenda Item 2d

Page 136

ARGYLL AND BUTE COUNCIL COUNCIL
FINANCIAL SERVICES 27 FEBRUARY 2025
RESERVES AND BALANCES – UPDATED FOR BUDGET PACK 2025-26 
2. INTRODUCTION 
2.1 This report outlines current balances on all of the Council’s reserves, both
usable and unusable. It also provides detail on the monitoring of the earmarked
balances within the General Fund.   
3. DETAIL 
3.1 Types of Reserves 
3.1.1 Usable Reserves - Councils have powers to establish certain resource backed
reserves which can be used to fund expenditure.  The powers of councils to
establish reserves are laid out in Schedule 3 of the Local Government
(Scotland) Act 1975.  These allow councils to establish a Renewal and Repairs
Fund, Insurance Fund and Capital Fund. Councils can also establish a Useable
Capital Receipts Reserve.  The Council must also maintain a General Fund and
can earmark balances for specific purposes within the General Fund. 
3.1.2 Unusable Reserves – Councils are also required to establish certain reserves
that are not backed by resources. They are required purely for accounting
purposes and do not represent resources available for councils to utilise. The
Pensions Reserve, Revaluation Reserve, Capital Adjustment Account, Financial
Instruments Adjustment Account and Accumulated Absences Account fall into
this latter category of accounting reserves. 
3.2 Reserve Balances at 31 March 2024 
3.2.1 The balances on each type of reserve at 31 March 2024 are set out in the two
tables below, updated as per the Audited Accounts for 2023-24. 
Unusable Reserves £000
Revaluation Reserve 180,661
Capital Adjustment Account 249,093
Financial Instruments Adjustment Account (1,585)
Pensions Reserve (19,578)
Accumulated Absences Account (8,272)
Total Unusable Reserves 400,319 
Usable Reserves £000
Repairs and Renewals Fund 2,763
Capital Fund and Usable Capital Receipts Reserve 3,197                                                                                                                
General Fund  115,741
Total Usable Reserves  121,701
Total Reserves  522,020 
Page 136

Page 137

3.2.2 The Revaluation Reserve represents the unrealised gains in the valuation of
fixed assets. The Capital Adjustment Account represents the difference
between depreciation based on proper accounting practice and statutory
charges for financing capital expenditure. The Financial Instruments Adjustment
Account represents the difference between gains and losses on borrowing and
statutory capital financing charges. The Pensions Reserve represents the
difference between pension costs based on proper accounting practice and
payments made for pension costs. The Accumulated Absences Account
represents the costed difference between holiday pay entitlement and actual
holidays taken at 31 March. 
3.2.3 The Repairs and Renewals Fund was established to support funding of renewal
and replacement of school equipment.  Schools can only draw on the Repairs
and Renewals Fund to the extent they have previously paid into the Fund and
contributions must be contained within schools devolved budgets. 
3.2.4 The Capital Fund was established to receive all capital receipts generated by
the Council and can be used to support the capital plan or meet the principal
repayments on loan charges. The Council decides as part of the budget
process each year how it wishes to draw funding from the Capital Fund 
3.2.5 The Usable Capital Receipts Reserve relates to the accumulated unspent
capital receipts from sale of council houses prior to transfer of the housing
stock. The reserve forms part of the Council’s Strategic Housing Fund and can
only be used for investment in social housing. The reserve will be used in
accordance with the approach to investing in housing agreed by the Council in
August 2012. 
3.3 General Fund 
3.3.1 The General Fund balance at 31 March 2024 can be analysed as follows: 
Balance
31/03/24
£000
Balance on General Fund as at 31 March 2023 86,356
Increase to General Fund balance at end of 2023-24 29,385
Earmarked Balances (107,443)
Contingency allowance at 2% of net expenditure (6,039)
Unallocated balance as at 31 March 2024 2,259 
* Note that the earmarked balance of £107.443m includes £35.658m of new
earmarked reserves relating to the Service Concessions gain as detailed at
paragraph 3.6. 
3.3.2 The General Fund includes balances that the Council has agreed to earmark for
specific purposes. Some of these earmarked balances will be spent during the
current financial year and some of them will be held over and spent in later
years. The table below shows the balance at 31 March 2024, the new amounts
earmarked from the Strathclyde Pension Fund savings (see section 3.7), the
Page 137

Page 138

amount from the revenue budget for Capital agreed at Council in February
2024, the amounts that are currently invested or set aside for major initiatives,
the amount already spent and planned to be spent in the current year, the
amount to be spent in future years and any sums no longer required to be
earmarked. Appendix 1 provides further details on the breakdown of unspent
budget earmarkings.  Officers have reviewed and updated the spending
profiles. 
3.3.3 At the council meeting on 26 September 2024, the council agreed to release a
total of £1.558m back to the General Fund, to assist with balancing the 2025-26
budget. 
3.4 Unallocated General Fund Balance 
3.4.1 The Council’s General Fund contingency is set at 2% of net expenditure for
2024-25 and amounts to £6.039m.  This contingency is held to provide a
working balance to help cushion the impact of uneven cash flows and cushion
the impact of unexpected events.  It is up to authorities to make their own
Page 138

Page 139

judgement on the level of reserves taking local circumstances into account, for
example, previous call on contingency and amount of unallocated reserves
held.  The contingency needs to be updated to reflect the updated budget for
2025-26.  The budgeted net expenditure based on the proposed budget
contained within the revenue budget overview report is £325.976m.  2% of this
balance amounts to £6.520m. There is currently a contingency of £6.039m,
therefore £0.481m will require to be moved from the unallocated General Fund
balance to supplement the current contingency. 
3.4.2 The revenue budget position as at 31 December 2024 was estimated to be a
£4.215m overspend, of which £2.179m relates to Social Work.  The Chief
Financial Officer of the IJB has now written to the Council to request access to
the Strathclyde Pension Fund gain that is held in reserves for the HSCP and
therefore it is expected that the Social Work will outturn within budget after
applying these reserves. 
3.4.3 It was agreed by the Council on 23 November 2024 that a financial resource of 
£0.025m be transferred to Live Argyll for the provision of staffing at the Corran
Halls for the duration of the Royal National Mod.  It was agreed that this was to
be funded from the unallocated General Fund. 
3.4.4 On 24 January 2025 the Council area was impacted by Storm Eowyn and there
was damage to some infrastructure as well as trees down incurring damage to
roads and footways.  At this time it is not known how much the recovery work
will cost and we have been in touch with Scottish Government to activate the
Bellwin Scheme and the Council’s insurers have been informed in relation to
property damage.  Even if we are able to access the Bellwin Scheme, the
current threshold over and above what it is expected we cover ourselves is
£558,200.  It will be a number of weeks before we are able to get a cost of the
recovery but this could impact the outturn and therefore the estimated
unallocated General Fund position.   
3.4.5  The table below summarises the position of the unallocated General Fund
balance taking into consideration the points noted above.  The estimated
unallocated General Fund at the end of the financial year is a deficit of
£0.283m.  It may be that this position is improved if the forecast outturn is better
than estimate, however, if the position remains then the Council will be using
the General Fund contingency and a recovery plan will need to be put in place
in order to bring the continency level back to the 2% agreed policy.   
Heading Detail £000
Unallocated General Fund
as at 31 March 2024
This is the balance that is
unallocated over and above the 2%
contingency, which amounts to
£6.039m
2,259
Current Forecast Outturn
for 2024-25 as at 31
December 2024
Per paragraph 3.4.2.  (4,215)
Social Work outturn
adjustment
Per paragraph 3.4.2 - Social Work
overspend reduced to zero.
2,179
Page 139

Page 140

Earmarked Balances no
longer required
Per paragraph 3.3.3 – earmarked
reserves released to General Fund
1,558
Earmarked Reserves set
aside for 2025-26 budget
Per paragraph 3.3.3 – will be set
aside to use for 2025-26 budget
(1,558)
Live Argyll for Royal
National Mod
Per paragraph 3.4.3 (25)
Transfer of contingency to
maintain 2% level
Per paragraph 3.4.1 (481)
Estimated Unallocated
balance as at 31 March
2025 
(283) 
3.5  Loans Fund Review 
3.5.1 At the Council meeting on 27 February 2020, it was agreed that the one-off re-
profiling gain of £20.561m generated by the loans fund review should be used
partly to create a provision for the increasing principal repayments over the next
10 years (£7.649m) with the remainder of the gain (£12.912m) used to fund
known liabilities/cost pressures. The £12.912m has now been transferred to
Earmarked Reserves in full. 
3.6 Service Concessions 
3.6.1 At the Council meeting on 23 February 2023 it was agreed that the Council
adopt the financial flexibility introduced by the Scottish Government relating to
Service Concession contracts. This resulted in a one-off retrospective gain of
£36.038m.  The commitments associated with this were further refined at the
Council meeting on 22 February 2024 and it was agreed that £0.380m be
transferred into the general fund balance, leaving a one-off gain of £35.658m
which is now being held in earmarked reserves.  Further, existing earmarkings
totalling £2.666m in respect of Rothesay Pavilion have been consolidated with
the Service Concessions earmarked resources, for monitoring purposes. 
Appendix 2 provides information on these commitments, totalling £38.324m. 
3.6.2 At the budget meeting on 23 February 2023, the Council established a £7m
Priorities Investment Fund to lever in, secure and support key strategic
investments in this year and future years.  By the budget meeting on 22
February 2024, £0.850m has been committed towards the Housing Emergency,
Area Plans and Strategic Development Frameworks, leaving £6.150m.  A
further £1.028m was then committed towards the capital plan and £0.380m to
supplement the Unallocated General Fund Balance leaving £4.742m. 
Commitments made during 2024-25 were £0.050m for the Clipper Race and
£0.944m towards the weather incident costs, leaving a balance of £3.748m
remaining in the Fund.     
3.7 Spend to Save/Transformation Reserves (SPF Gain) 
3.7.1  The Strathclyde Pension Fund (SPF) reported an exceptionally strong set of
results with a surplus of almost £9bn which has allowed a reduction in the
employer contribution rate.  Argyll and Bute Council is seeing a reduction in
employer contributions from 19.3% to 6.5% over 2024-25 and 2025-26, before
Page 140

Page 141

reverting to a sustainable long-term rate in the third year of 17.5%.  For the
Council, the one-off saving in the first two years associated with a reduction to
6.5% is £6.875m per year.  On 22 February 2024, the Council agreed to
allocate the cumulative gain in the first two years of £13.750m as follows: 
Description 2024-25
£000
2025-26
£000
Total
£000
Realised saving 6,875 6,875 13,750
£2m in 24-25 to balance revenue budget (2,000)  (2,000)
£3.750m allocation to capital plan (3,750)  (3,750)
£2m to be directed towards
Transformation/ Spend to save projects (1,125) (875) (2,000)
£2m in 25-26 to balance revenue budget  (2,000) (2,000)
£2m in 26-27 to balance revenue budget  (2,000) (2,000)
£2m allocation to capital plan  (2,000) (2,000) 
0 0 0 
3.7.2 The £6.875m from the 2024-25 revenue budget saving has been logged within
the earmarkings with the commitments noted above to allow expenditure to be
made against them. 
3.7.3 For Social Work, the SPF saving is £3.053m per annum and is being ring
fenced within the Council reserves for utilisation by the HSCP in the future. 
This amount has also being logged within the earmarkings in 2024-25 to allow
expenditure to be made against this balance.   
3.7.4 As at 31st December 2024, the commitments against the Strathclyde Pensions
fund for Transformation/Spend to Save projects are as follows: 
Description Commitment
£000
Data Platform Build Consultancy – to build a data
platform which will provide a new approach to how ABC
organised and accesses its data to support strategic
decision making.  44
RIS Service Review – a report was presented to EDI on
20 June 2024 regarding the need for external support to
assist in delivering recommendations from Stage 1 of the
RIS Review. 150
Conversational AI – towards an investment in a one-year
proof of concept contract to implement Conversational AI
across the web, voice and social media channels for the
Council.  31
Total Committed 225 
3.8 Review and risk Assessments 
3.8.1 Assessing the adequacy of reserves should take account of the strategic,
operational and financial risks facing the Council and should consider both
internal and external factors.  Appendix 2 to this report identifies the range of
issues in terms of budget assumptions and financial standing and management
Page 141

Page 142

that should be considered in assessing the level of reserves.  It relates only to
consideration of the contingency to be held in the General Fund balance.  A
separate financial risk analysis report has been prepared looking at the overall
financial risks relating mainly to the revenue budget but notes a couple of risks
in respect of the capital budget also. 
3.8.2 There are 20 categories included in the risk analysis and 3 have been assessed
as low, 4 low/medium, 6 medium and 7 medium/high.  The medium/high risks
are in respect of council wide cost risks, funding risks, inflation rates, world
events, general financial climate, Health and Social care partnership, and the
impact of climate change.   
3.8.3 Based on the above and taking cognisance of the level of unallocated general
fund balance that remains, it is recommended that the contingency for the
General Fund balance should be retained at 2%.   
4. CONCLUSION 
4.1 The report outlines the overall reserves and balances for the Council covering
the purpose and level of each reserve.  It also provides detail as to expenditure
against earmarked balances held within the General Fund.  There is currently
an estimated use of £0.283m of the contingency balance by the end of 2024-25
financial year which will need to be monitored with a potential recovery plan put
in place.  Following a review of risk factors, it is recommended that the
contingency for the General Fund balance should be retained at 2%. 
5. IMPLICATIONS 
5.1 Policy  Earmarked funds and funds set aside for delivery of
Single Outcome Agreement are available to support
Council Policy.
5.2 Financial   Outlines the balances held with the Council’s usable and
unusable reserves.     
5.3 Legal   None.
5.4 HR  None.
5.5 Fairer Scotland Duty See Below
5.5.1 Equalities None
5.5.2 Socio-Economic
Duty
None
5.5.3 Islands Duty None
5.6 Climate Change None
5.7 Risk   A contingency of £6.520m (equivalent to 2% of net
expenditure) has been set aside as part of the general
fund.  This has been subject to a risk assessment. 
5.8 Customer Service   None. 
5.9 The Rights of the
Child (UNCRC)
None 
Page 142

Page 143

Kirsty Flanagan
Executive Director/Section 95 Officer 
13 February 2025 
Councillor Ross Moreland, Policy Lead for Finance and Commercial Services 
APPENDICES
Appendix 1 – Earmarked Reserves breakdown of unspent budget as at 31 December
2024
Appendix 2 – Earmarked Reserves breakdown of Service Concessions earmarking 
Appendix 3 – Risk Assessment for Review of Reserves 
For further information contact Carolyn Earl, Head of Financial Services
carolyn.earl@argyll-bute.gov.uk 
Page 143

Page 144

APPENDIX 1
Earmarked Reserves - Unspent Budget
As at 31 December 2024
Ref Department Service Description Opening
Balance
Budget
Drawdown
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount
Planned to
be Spent
from
2026/27
onwards
001 Chief Executive's Unit Community
Planning
Service Concessions - Priorities Investment
Fund (Area Plans)
200,000 86,838 113,162 13,162 100,000 As agreed by Policy and Resources Committee on 23 October 23 - drawdown of
£200,000 from the Priorities Investment Fund to fund two temporary posts and
associated costs to produce meaningful area plans
100,000 100,000 0
006 Chief Executive's Unit Community
Planning
Communities and Partnership Team 8,855 0 0 0 0 The funds have originated from externally sourced income due to an employee being
seconded to the Scottish Community Development Centre (SCDC).  The funds will be
used to support the team in relation to meeting its priorities of Building Back Better
(Communities), Climate Change and the review of the Argyll and Bute Outcome
Improvement Plan.  This earmarking merged September 24 (per Council Decision)
with 003 Community Planning - temp post to support communities.
0 0 0
008 Executive Director (Douglas
Hendry)
Across Services /
Commercial
Services
Information Management (Estates Survey
Work)
12,697 0 0 0 0 To support a number of initiatives in respect of improving the Council's information
management in line with the transformation agenda and increasing the pace of
change as outlined in the BV Review.  The planned initiatives include: Estates Survey
work £122k, Digitalisation of Title Deeds £92k, document management and workflow
system for Planning, Building Standards and Environmental Health £77k and a
balance of funding to explore information management solutions in a strategic and
coherent way £209k. This balance relates to Estates Survey Work. Having a procured
supplier to provide floor plans at short notice is required to be able to react quickly
to requests. If this isn't available Estates would need to go through the procurement
process again which would delay any projects by several months. There isn’t a
detailed plan to use this resource it is more about being able to react quickly and not
delay projects. 
Council agreed September 24 to merge this with 018 Site Investigation works.
0 0 0
009 Executive Director (Douglas
Hendry)
Across Services /
Education
Digital Projects (Supply Staff Booking
System)
15,200 9,900 5,300 0 5,300 To deliver a number of Digital Service Transformation Projects with a commitment of
£0.035m towards a Supply Staff Booking system.  Phase 1 of the project is nearing
completion.
9,900 5,300 0
010 Executive Director (Douglas
Hendry)
Commercial
Services
Rothesay Pavilion Charity 750,000 0 1,159,204 0 1,159,204 Agreed at Council meeting February 2020,Unspent Budget Earmarking 010 of £750k
additional revenue support subject to conditions which seek to minimise the risk to
the Council as far as is reasonably practicable including requirement for adequate
business and financial management and regular reporting by RPC.  This funding is to
support Rothesay Pavilion Charity in the first 2 years of the building being
operational.  Merged September 24 per Council decision with CHORD earmarking 094
£409k which was about building up a provision towards future Council commitment
to provide up to £150,000 per annum running costs for Rothesay Pavilion.
0 1,038,608 120,596
012 Executive Director (Douglas
Hendry)
Commercial
Services
Rothesay Pavilion Essential repairs 306,400 0 0 0 0 Essential repairs to deal with potential health and safety risks and to avoid further
deterioration.  Budget provision was approved by the Policy and Resources
Committee on 21 August 2014.   At Council Meeting September 24, it was agreed to
merge the 4 capital earmarkings for Rothesay Pavilion into one line with the
narrative indicating the sources.  Earmarkings 012, 155, 167 and 170 combined under
reference 155.
0 0 0
014 Executive Director (Douglas
Hendry)
Commercial
Services
Commercial Investment Manager post and
specialist consultant technical resource
(previously Asset Management Fund)
104,000 24,758 79,242 79,242 0 The Asset Management Fund has been redirected to Capital going forward but the
interest for 2023-24 is to be used towards a Commercial Investment Manager Post. 
This is because funding of £200k from the Asset Management Fund was agreed at ELT
in June 22 for the post, along with specialist consultancy and technical resources  that
will be required to support early projects.  Note, the  £104k represents the balance of
the £200k commitment.
104,000 0 0
Page 144

Page 145

Ref Department Service Description Opening
Balance
Budget
Drawdown
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount
Planned to
be Spent
from
2026/27
onwards
015 Executive Director (Douglas
Hendry)
Commercial
Services
Estates - NDR Revaluation Appeals 59,938 0 59,938 29,969 29,969 The Council agreed to make provision to meet the cost of appealing Non Domestic
Rates (NDR) revaluations which were imposed from April 2017. The remaining funds
were carried forward to the 2023/24 revaluation cycle however a recent change in
position by the Scottish Government may restrict the appeals which can be made.
This is still under discussion and Gerald Eve Surveyors have been appointed as
specialist advisers on this matter, who are progressing 2023-26 appeals. In the event
that appeals are limited there may be an opportunity to utilise Gerald Eve for more
general valuation advice subject to Procurement approval.
29,969 29,969 0
016 Executive Director (Douglas
Hendry)
Commercial
Services
Mid Argyll Community Pool 30,000 30,000 0 0 0 At the Council Budget meeting on 22 February 2024, the Council committed to a one-
off investment of £0.030m to Mid Argyll Community Pool in response to an external
funding request.
30,000 0 0
017 Executive Director (Douglas
Hendry)
Commercial
Services
MacTaggart Leisure Islay 30,000 30,000 0 0 0 At the Council Budget meeting on 22 February 2024, the Council committed to a one-
off investment of £0.030m to MacTaggart Leisure, Islay in response to an external
funding request.
30,000 0 0
018 Executive Director (Douglas
Hendry)
Commercial
Services
Site Investigation Works 21,013 0 33,710 33,710 0 ER018 24-25  £21k - For Site Investigation works in relation to Tweeddale Street Car
Park and Oban Airport Business Park, exploring commercial opportunities to develop
the sites and raise revenue income for Argyll and Bute Council. HUB North were
instructed to procure contractors to undertake the site investigations these are now
complete. The remainder of the budget is intended to be utilised for other site
investigation and pre-development works to further develop commercial
opportunities across the council area.
Agreed by Council September 24 to combine 24-25 ER008 Information Management
(Estates Survey Work) - Having a procured supplier to provide floor plans at short
notice is required to be able to react quickly to requests. If this isn't available Estates
would need to go through the procurement process again which would delay any
projects by several months. There isn’t a detailed plan to use this resource it is more
about being able to react quickly and not delay projects.
33,710 0 0
021 Executive Director (Douglas
Hendry)
Education ASN Review 1,255,000 0 1,255,000 565,000 690,000 To fund capital costs of ASN adaptations as part of ASN Review to increase equity of
provision across Argyll and Bute.  This will be subject to a business case as part of the
wider ASN review. Update: Business case now approved and working group set up
with quotes for works being carried out.
565,000 690,000 0
024 Executive Director (Douglas
Hendry)
Education Reduced Teacher Staffing Costs - Strike
Action
800,000 800,000 0 0 0 To fund one off savings in 2024-25 from the underspend in staffing from strike action. 800,000 0 0
033 Executive Director (Douglas
Hendry)
Education (2023 Digital Projects) School WiFi
Upgrades
166,924 0 0 0 0 To extend WiFi coverage within school settings through the purchase of additional
hardware such as access points, switches and other networking hardware. This will
result in more flexible learning spaces and support the growing number of devices
within schools. Project now underway and if budget not fully utilised it is hoped that
the balance could be diverted to assist with Capital costs of Education Network
Paper.
0 0 0
034 Executive Director (Douglas
Hendry)
Education Education Transformation Fund 144,637 0 0 0 0 At the Council meeting on 27 February 2020, it was agreed to input £400k into
Education Digital Learning.  The additional funds have been spent in 20/21, 21/22 and
22/23 as part of the ongoing transformation work in the Education service, focussing
on digital and virtual learning technology and the development of learning clusters. 
0 0 0
036 Executive Director (Douglas
Hendry)
Education MCR Pathways Pilot 80,000 0 80,000 80,000 0 Funding to support implementation of MCR Pathways mentoring programme within
three secondary schools for 2023-24 academic year. Funding will allow the
employment of a dedicated Co-ordinator within each setting to develop and
implement the programme which is designed to benefit care experienced and other
disadvantaged pupils through targeted mentoring support.
80,000 0 0
042 Executive Director (Douglas
Hendry)
Education Gaelic Specific Grant 30,000 0 30,000 0 30,000 Gaellic Specific Grant £30k - This earmarking refers to the Council contribution
towards the Gaelic grant for 22-23 and will fund the costs of Gaelic Language
Principal Teacher in 24-25 academic year.
0 30,000 0
043 Executive Director (Douglas
Hendry)
Education (2023 Digital Projects) Cashless Catering 30,000 4,996 5,004 5,004 0 To support the ongoing implementation of the new cashless catering system during
the testing and roll out phase.
£20k released back to General Fund Septmber 24 per Council decision as no longer
required.
10,000 0 0
Page 145

Page 146

Ref Department Service Description Opening
Balance
Budget
Drawdown
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount
Planned to
be Spent
from
2026/27
onwards
049 Executive Director (Douglas
Hendry)
Education Skype for Business for Education / Digital
Projects (Skype for Business)
10,000 0 0 0 0 To fund the initial capital costs for the implementation of Skype for Business for
Education.  This will bring the Education service in line with other council
departments and will improve staff collaboration and modernise school telephony to
deliver the  service more efficiently and cost effectively.
0 0 0
052 Executive Director (Douglas
Hendry)
Education Education Learning Estate Condition
Surveys
1,815 0 0 0 0 To fund the delivery of School Core Facts (SCF) compliant Condition Surveys for
prioritised School Buildings.
Balance of £2k released back to General Fund per Council decision September 24 
due to the small amount remaining which can be covered by the service.
0 0 0
059 Executive Director (Douglas
Hendry)
Legal and
Regulatory
Support
Education Purchasing Officers 210,000 0 210,000 0 210,000 The earmarked funds will be used to fund an education purchasing team within the
Procurement Service for two years.  The team will embed good procurement
practice, train headteachers on current procurement process requirements, develop
spend plans that evidence best value.
0 210,000 0
061 Executive Director (Douglas
Hendry)
Legal and
Regulatory
Support
Information Management (Digitalisation of
Title Deeds)
92,000 0 92,000 20,500 71,500 To support a number of initiatives in respect of improving the Council's information
management in line with the transformation agenda and increasing the pace of
change as outlined in the BV Review.  The planned initiatives include: Estates Survey
work £122k, Digitalisation of Title Deeds £92k (delay on spending due to COVID-19),
document management and workflow system for Planning, Building Standards and
Environmental Health £77k and a balance of funding to explore information
management solutions in a strategic and coherent way £209k
20,500 51,000 20,500
063 Executive Director (Douglas
Hendry)
Legal and
Regulatory
Support
(2023 Digital Projects) Replacement of
Council Chambers Online Meeting
Equipment
50,071 5,353 44,718 0 44,718 Current online meeting system  is less than resilient and has failed on a number of
occasions, leading to issues at strategic committees. A condition assessment by the
incumbent maintenance contractor has highlighted that the current equipment is
now at end of life and unsupportable due to the  obsolescence of the system.
Discussions with ICT have taken place to identify a simpler more robust solution to be
procured.
NUWAY system and maintenance, system installed, ongoing maintenance contract to
2030
5,353 44,718 0
064 Executive Director (Douglas
Hendry)
Legal and
Regulatory
Support
Councillor IT Equipment 44,557 0 44,557 22,000 22,557 There is currently no budget for the provision and renewal of IT equipment for
members. The earmarking identifies a resource to utilise spend for that purpose to
ensure that members have continued support in maintaining and replacing vital IT
equipment.
22,000 22,557 0
065 Executive Director (Douglas
Hendry)
Legal and
Regulatory
Support
Digital Projects: Hybrid Council meetings 43,302 12,000 0 0 0 The funding will be used to maintain the ICT equipment used to support the provision
of on-line and hybrid Council meetings.  Will be used to fund Public-I licence over 3
years - for livestreaming Council meetings.
Balance of £31k released back to General Fund per Council decision September 24
and an associated cost pressure built in to 2025-26 budget cover the routine annual
costs.
12,000 0 0
066 Executive Director (Douglas
Hendry)
Legal and
Regulatory
Support
Debt Counselling & Welfare Rights 21,452 5,265 735 735 0 To meet the cost of a Debt Counselling and Welfare Rights Management System.
Balance of £15k released back to General Fund per Council decision September 24
and an associated cost pressure built in to 2025-26 budget cover the routine annual
costs.
6,000 0 0
067 Executive Director (Douglas
Hendry)
Non Departmental
/ Legal and
Regulatory
Services
Community Resilience Fund 71,999 0 5,000 5,000 0 Fund established in 2012/13 to be spent over more than one year. Fund reduced at
the Council meeting on 11 February 2016.  Used to cover the costs of emergency
phone lines and a contract with Aggreko for generators if required in an Emergency
Planning/Civil contingencies incident.  These costs amount to approximately £5k per
year.
Balance of £67k released back to General Fund per Council decision September 24
and an associated cost pressure built in to 2025-26 budget cover the routine annual
costs.
5,000 0 0
068 Executive Director (Kirsty Flanagan) Across Services /
Customer Support
Services
Digital Projects (Increase in Schools
Bandwidth)
63,455 0 63,455 0 63,455 To complete one of a number of Digital Service Transformation projects with a
commitment of £0.064m to increase Schools Bandwidth.  Committed for MS 365
project - D Logan/I Jackson. Paper went to ELT in Dec 24.
0 0 63,455
069 Executive Director (Kirsty Flanagan) Across Services /
Customer Support
Services
Digital Projects (Replacement Learning
Management System)
11,470 0 11,470 11,470 0 To deliver a number of Digital Service Transformation Projects with an original
commitment of £0.030m towards a replacement Learning Management System
£0.030m.  This money will be used to pay for consultancy for an interface between
itrent and totara. Profiled for 24/25 based on decision to do a phased
implementation of itrent.
11,470 0 0
Page 146

Page 147

Ref Department Service Description Opening
Balance
Budget
Drawdown
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount
Planned to
be Spent
from
2026/27
onwards
070 Executive Director (Kirsty Flanagan) Across Services /
Development and
Economic Growth
Information Management (Document
Management and Workflow for Planning,
Building Standards and Environmental
Health)
21,177 0 21,177 21,177 0 Hoping to implement the replacement for IDOX in March 2024 but there have been
severe issues/delays with the new programme . 
Dec 24 Project has been scrapped as it was not working. Awaiting procurement to
write termination of contract legal documents, until this is completed we will not
know if any further cost are due.
21,177 0 0
073 Executive Director (Kirsty Flanagan) Customer Support
Services
(2023 Digital Projects) iTrent Project 320,555 0 320,555 320,555 0 Combination of parallel running of the new iTrent system alongside the legacy
systems for up to 18 months whilst iTrent is implemented and additional staffing
resource to implement iTrent in late June 2024 and support staff for the first 3
months of operation through summer 2024. Total includes £73k from Financial
services for funding additional staffing resource to implement the payroll
components of the iTrent HR and Payroll System by the end of June 2024 and support
staff for the first 3 months of operation during summer 2024.
320,555 0 0
075 Executive Director (Kirsty Flanagan) Customer Support
Services
Growing our Own and Modern Apprentices 109,150 0 69,150 44,000 25,150 Funding earmarked to support trainee development and modern apprenticeship
opportunities based on priority workforce risk areas.  A Trainee Regulatory Services
post has been proposed by the manager who was unable to secure a suitable
candidate for the original advert. The spend would be spread over 24/25 and 25/26
once a suitable candidate is in post.
Balance of £40k released back to General Fund per Council decision September 24 as
only £69k is still required for the intended purpose.
44,000 25,150 0
076 Executive Director (Kirsty Flanagan) Customer Support
Services
Security Operations Centre Subscription 71,188 0 71,188 0 71,188 There is a requirement to pay for a 3-year subscription at £60,000 per annum with a
cost pressure being added to the ICT revenue budget to cover the costs from 2026-27
onwards. 
0 71,188 0
077 Executive Director (Kirsty Flanagan) Customer Support
Services
(2023 Digital Projects) Resilient Website
Project
60,000 14,000 46,000 0 46,000 Cybersecurity action to move to a cloud based website platform that would improve
resilience and enable service continuity in the event of a cyber attack.  Procurement
in progress for resilient website solution and Scotgov Cloud Services Project providing
input. Contract Award expected by end 2023. Procurement in progress for resilient
website solution.   Contract Award expected FQ1 2024-5.  3 year contract has been
awarded to BigBlueDoor.  14k spend 24/25, 23k in 25/26 and 23k in 26/27.
14,000 23,000 23,000
078 Executive Director (Kirsty Flanagan) Customer Support
Services
(2023 Digital Projects) Digital Project
Officer
34,121 0 34,121 34,121 0 Employ a temporary Digital Project Officer as part of OD changes - additional
member of staff required to action changes, unable to recruit so existing staff
increasing hours.
34,121 0 0
079 Executive Director (Kirsty Flanagan) Customer Support
Services
Implementation of Gaelic Language Plan 30,000 0 30,000 2,000 28,000 Agreed at Council Meeting February 2021.  Provision of funding for delivery and
implementation of the council’s Gaelic Language Plan in recognition of the
contribution that Gaelic makes to economic growth and to the tourism sector, and to
enable delivery of key activities within the plan which currently receive no revenue
funding.  In discussion with Bord na Gaidhlig about a 3-year Gaelic Plan funding
programme as opposed to individual grant applications for specific projects. This
earmarking would be used to provide match funding for that 3 year programme of
projects.  3 year match funding approved December 2024.
2,000 28,000 0
080 Executive Director (Kirsty Flanagan) Customer Support
Services
Business Development Training 27,025 20,397 26,064 -397 26,461 £27k budget from original Business Development Training earmarking 080 remaining
at 31/03/24.  This budget is funding ongoing leadership development, coaching,
action learning sets and commissioned training including Priority Management.
Agreed by Council September 24 to merge with 24-25 EMR 082 - In order to
maximise the opportunities and efficiencies of digital learning, this funding will be
used to support the extension of digital learning in order to deliver the Digital
Learning Strategy, which was approved in FQ4 20/21. This money is to support the
additional digital learning capacity required to build online elements of AB365 and
other key digital learning as we increase our digital learning offering linked to the
digital skills survey and review of corporate training. Delays in recruitment meant this
has been reprofiled for spend in 24/25.
20,000 26,461 0
082 Executive Director (Kirsty Flanagan) Customer Support
Services
Learning and Development 19,436 0 0 0 0 In order to maximise the opportunities and efficiencies of digital learning, this
funding will be used to support the extension of digital learning in order to deliver
the Digital Learning Strategy, which was approved in FQ4 20/21. This money is to
support the additional digital learning capacity required to build online elements of
AB365 and other key digital learning as we increase our digital learning offering
linked to the digital skills survey and review of corporate training. Delays in
recruitment meant this has been reprofiled for spend in 24/25.  Agreed by Council
September 24 to merge with 24-25 080 Business Development Training.
0 0 0
Page 147

Page 148

Ref Department Service Description Opening
Balance
Budget
Drawdown
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount
Planned to
be Spent
from
2026/27
onwards
083 Executive Director (Kirsty Flanagan) Customer Support
Services
(2023 Digital Projects) Digital Engagement
Services Developer
15,677 13,504 2,173 2,173 0 To fund 50% of a new temporary LGE10 post.  The post is a Digital Engagement
Services Developer that will be provide capacity to deliver service efficiencies
through the use of the  new CREATE/RPA software.  The other 50% of the post can be
funded from a current vacancy. 
15,677 0 0
085 Executive Director (Kirsty Flanagan) Customer Support
Services
Establishing HR Service Centre 13,824 0 0 0 0 To facilitate the implementation of technical efficiency improvements and new
processes.  This money will be used to support phase two of the itrent project.  Spend
reprofiled for 2024/25 following delays in itrent project.  Agreed by Council
September 24 to merge this with earmarking 074 Skills Development Scotland.
0 0 0
096 Executive Director (Kirsty Flanagan) Development &
Economic Growth
Planning Income 60,000 0 60,000 60,000 0 To fund additional resources to support and develop the Council's planning service. 
Whilst recruitment issues within Argyll and Bute were largely been resolved during
2022/23, the requirement for the operation of the DM Service with reduced staffing
levels over an extended period of time, coupled with the increasing demand for
development post-Covid, and uncertainty caused by the introduction of National
Planning Framework 4 has given rise to a substantial backlog of case work and has
had a significant adverse impact on processing times for planning applications. Plans
to utilise this on additional staff costs in 24-25 in order to reduce the backlog.
Dec 24  draw down likely March 25
60,000 0 0
103 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Oban TIF (Tax Incremental Financing) 214,158 0 214,158 214,158 0 Will be used to fund the TIF Programme office for a further 3 years as well as the
programme office for Rural Growth Deal beyond the funding that was agreed at
Council for this in February 2021.
214,158 0 0
105 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Service Concessions - Priorities Investment
Fund (Project Officer for Housing
Emergency)
200,000 0 200,000 70,000 130,000 As agreed by Policy and Resources Committee on 15 February 2024 - drawdown of
£200,000 from the Priorities Investment Fund to fund a Project Officer to assist in
accelerating the work of the Housing Emergency.
Dec 24 post holder now in place awaiting further instruction from Budget holder
70,000 130,000 0
107 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Strategic Events & Festivals 41,260 15,100 26,160 26,160 0 At the Council meeting on 25 February 21, a decision was taken to agree £90k
funding for Events and Festivals for 22/23, in order that the application process can
commence during 21/22 and that this agreed figure be augmented by any
underspend remaining from the 20/21 financial year.  At 24 February 22, decision
made to agree £90k for 23/24, in order that the application process can commence
during 22/23 and that this agreed figure be augmented by any underspend remaining
from the 21/22 financial year.  Applications have been received and payments will be
made in 23-24. Final balance (£41,260) to be spent in 24/25
Dec 24 cost to date drwn down
41,260 0 0
112 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Screen Machine 28,000 0 28,000 28,000 0 At the Council Budget meeting on 22 February 2024, the Council committed to a one-
off investment of £0.028m to Screen Machine in response to an external funding
request.
Dec 24  Grant offer has now been sent out but payment now not due until Q1 25/26
28,000 0 0
120 Executive Director (Kirsty Flanagan) Development and
Economic Growth
International Eight Metre Association
World Cup
10,000 10,000 0 0 0 At the Council Budget meeting on 22 February 2024, the Council committed to a one-
off investment of £0.010m to the International Eight Metre World Cup in response to
an external funding request.
10,000 0 0
124 Executive Director (Kirsty Flanagan) Financial Services Revenue and Benefits BPR  - extra staff to
implement savings targets
86,955 0 86,955 0 86,955 On 23 February 2023, the Council agreed to the implementation of savings option
FIS2324-002 in relation to the Revenue and Benefits - Income Generation and
Business Process Review.   This included an extra 4 FTE of staff.  Delays in recruitment
have caused slippage in the allocated budget for these posts. 
0 86,955 0
127 Executive Director (Kirsty Flanagan) Financial Services Scotland Loves Local 57,453 57,453 0 0 0 As agreed by Council 22 February 24, a £57,453 underspend from the Scotland Loves
Local scheme to be allocated to support measures to help with the costs of living by
funding member organisations of the Community Food Forum, ALI Energy, Argyll and
Bute Citizens Advice Bureau and Bute Advice Centre, with detailed proposals to be
agreed by the Executive Director with responsibility for Finance, in consultation with
the Leader, Depute Leader and Leader of the Largest Opposition Group. Details of the
agreed spend are to be reported to elected members.
57,453 0 0
129 Executive Director (Kirsty Flanagan) Financial Services Financial Systems 33,748 0 33,748 33,748 0 The council is required to implement the IFRS16 Leases accounting standard  from
the 1st April 2024.
33,748 0 0
Page 148

Page 149

Ref Department Service Description Opening
Balance
Budget
Drawdown
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount
Planned to
be Spent
from
2026/27
onwards
130 Executive Director (Kirsty Flanagan) Financial Services Accounting and Budgeting Team Resilience 47,883 7,066 40,817 934 39,883 Training and examination fees for 6 staff who are currently undertaking their
professional CIPFA/ACCA training.  In addition funding the further training of 1 of our
auditors and providing finance business partner training to a group of our existing
professional staff.
8,000 8,000 31,883
134 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Waste Variation Monies 1,241,752 108,524 1,356,489 353,855 1,002,634 Waste Variation Monies - £1.242m balance at 31/03/24 (Original EMR134): This will
be used to fund/part-fund various waste infrastructure projects that will support the
council’s compliance with the 2026 ban on the Landfill of Biodegradable Municipal
Waste.
£462K in 2024-25 consisting of :- Island restoration/capping (£250K Gartbreck
completed will be tsf to capital), Helensburgh transfer station, recycling improve.
fund (island sites) design costs, recycling campaign publicity, technology trial on blue
bin recycling participation, consultancy costs relating to additional monitoring data
for SEPA and Consultancy follow on waste options appraisal and recycling campaign
material.
£993K in 2025-26  consisting of:- Island restoration/capping, Helensburgh transfer
station design costs pending outcome of business case, consultancy costs relating to
additional monitoring data for SEPA, recycling improve. fund (island sites) design
costs and waste PPP site conversion.
£10K in 2026-27 consisting of:-  consultancy costs relating to additional monitoring
data for SEPA.
Council agreed to merge with EMR149 September 24 - to be used to assist with the
Council's compliance with the 2026 ban on the Landfill of Biodegradable Municipal
Waste and supporting the overall Waste Strategy.
462,379 992,634 10,000
138 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Service Concessions - Priorities Investment
Fund (Strategic Development Framework)
450,000 0 450,000 225,000 225,000 As agreed by Policy and Resources Committee on 15 February 2024 - drawdown of
£450,000 to procure consultancy support to assist in driving forward the Strategic
Development Frameworks.
225,000 225,000 0
141 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
3G pitches / Tarbert Sports Pitches 287,835 81,158 206,677 7,149 199,528 In November 2018, the Council agreed to a maintenance funding package to be
progressed for a number of 3G pitches including Tarbert. This funding will provide an
estimated 6.5 years’ worth of ongoing maintenance up to 2025-26. There is the
potential to extend the continued upkeep of the pitches until 2026-27 given the
earmarking available will not be fully utilised by the end of 2025-26.  However, there
will be potential redundancy costs for 2 employees that will need to be covered from
the remaining balance. Paper on proposed extension to be prepared.
88,307 199,528 0
142 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Green Transport Initiatives 140,000 0 140,000 140,000 0 At the Council meeting on 27 February 2020, it was agreed to input £400k in Green
transport, investment in footway and cycle path maintenance supporting the healthy
wellbeing and green agenda.  Spend has been delayed due to COVID and this will be
taken forward in 23/24. £260k Footways Reconstruction programme now spent and
will be drawn down against capital programme during 23/24. £140k Ardrishaig North
Project spent in 22/23 and drawn down in 24/25 (capital expenditure).
140,000 0 0
146 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Climate Change 40,942 0 40,942 40,942 0 At the Council meeting on 27 February 2020, it was agreed to input £500k budget to
mitigate the impacts of weather related damage and climate change with specific
emphasis on gully cleaning and drainage improvements.  Spend has been delayed
due to COVID and the intention is to spend the funds on 2 Gully Motors plus staff
over next 2 years. Vehicles have been received and budget will be drawn down to
cover their cost. The remaining budget will be used towards running the vehicles.
40,942 0 0
147 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Amenity Services introduction of
management information system
28,099 0 0 0 0 Delay with introduction of amenity time recording system due to increased costs. 
Discussions ongoing to find alternative cheaper solution.  The software/system being
introduced by HR/Payroll during 2023-24 offers a time-recording facility.  Although
not included in the current HR/Payroll spec, once the new system is up and running,
the proposal would be to investigate the time-recording system to see if viable for
amenity time recording purposes.
Balance released back to General Fund per Council decision September 24 as there is
no plan to take this forward and this will be re-assessed following the introduction of
the HR/Payroll system.
0 0 0
149 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Services
(2023 Contract Inflation Adjustments)
Waste PPP
223,261 0 0 0 0 Proposal to merge with ref 134, to be used to assist with the Council's compliance
with the 2026 ban on the Landfill of Biodegradable Municipal Waste and supporting
the overall Waste Strategy.  Council agreed to merge 134 and 149 September 24.
0 0 0
Page 149

Page 150

Ref Department Service Description Opening
Balance
Budget
Drawdown
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount
Planned to
be Spent
from
2026/27
onwards
151 Executive Director (Kirsty Flanagan) Roads and
Infrastructure
Services
Weather Incident costs not covered by
Bellwin claim.
198,000 0 198,000 198,000 0 £839k was set aside at budget meeting in February 2024 as part of the unallocated
general fund balance workings to cover the weather incident costs not covered by
the Bellwin Claim.  As £641k was utilised during 23-24, the balance of £0.198m is
being earmarked for costs expected in 24-25.
198,000 0 0
154 Non Departmental Non Departmental Service Concessions - Replace previous
loans fund principal repayment holiday
5,400,000 0 5,400,000 5,400,000 0 As agreed at Council meeting 23 February 2023 - The one-off retrospective benefit
will be used to replace exercising the principal repayment holiday that was previously
agreed by Council.
5,400,000 0 0
164 Non Departmental Non Departmental Pay Inflation Contingency 1,700,000 0 1,700,000 1,700,000 0 Negotiations for the 2024/25 pay award are ongoing but initial discussions suggest it
will be beyond the 3% increase currently built into the budget outlook. £1.7m
equates to approximately a 1% pay rise therefore providing a contingency at this
level is prudent
1,700,000 0 0
170 Non Departmental Non Departmental Underwriting development of Rothesay
Pavilion
1,000,000 0 0 0 0 Funding to meet additional costs identified as necessary for the refurbishment of
Rothesay Pavilion (£1m).
At Council Meeting September 24, it was agreed to merge the 4 capital earmarkings
for Rothesay Pavilion into one line with the narrative indicating the sources. 
Earmarkings 012, 155, 167 and 170 combined under reference 155.
0 0 0
171 Non Departmental Non Departmental Oban TIF (Tax Incremental Financing -
Excess NDR)
875,651 0 875,651 0 875,651 This is the surplus NDR after paying all Loans Charges in respect of TIF infrastructure
projects.  This fund will be used in the future as TIF projects are delivered.  
Discussions in place on future ff the next TIF project (Oban Airport) which will utilise
this reserve.  If the project does not go ahead, we will need to return NDR to Scottish
Government
0 875,651 0
180 Non Departmental Non Departmental Treasury Gain 294,000 294,000 0 0 0 To fund one off operational saving 202425 003 as agreed by Council when setting
2024/25 budget in February 2024.
294,000 0 0
184 Non Departmental Non Departmental Information Management (Balance of
Funding)
200,469 0 200,469 200,469 0 To support a number of initiatives in respect of improving the Council's information
management in line with the transformation agenda and increasing the pace of
change as outlined in the BV Review.  This was the balance of funding to explore
information management solutions in a strategic and coherent way £209k. 
Committed for MS 365 project - D Logan/I Jackson. Paper went to DMT in Dec.
200,469 0 0
186 Non Departmental Non Departmental Engagement with Hub North re provision of
services for older adults and vulnerable
people across Argyll and Bute
100,000 0 100,000 30,000 70,000 At the Council budget meeting February 23, an allocation of £0.1m from the
Unallocated General Fund balance for the Health and Social Care Partnership to
engage, in partnership with the Council, with Hub North to develop a strategic
business case in relation to the provision of services for older adults and other
vulnerable people across Argyll and Bute.  It is intended that this will be spent on an
on-going business case and options appraisal work with Hub and that a sizable
proportion will be spent during 24/25
30,000 70,000 0
187 Non Departmental Non Departmental Spend to Save Route Optimisation Software 82,775 0 82,775 4,800 77,975 One-off re-profiling gain as a result of the loans fund review to fund known
liabilities/cost pressures as agreed at budget setting meeting in February 2020.  The
route optimisation project has been delayed due to staff turnover and absences,
recent meetings involving the Council and Routewear have set out future objectives
and the project has been extended to 2025-26.
4,800 77,975 0
188 Non Departmental Non Departmental CHARTS 80,000 55,000 25,000 25,000 0 At the Council Budget meeting on 22 February 2024, the Council committed to
£0.075m one-off investment in CHARTS in response to an external funding request
will be spent in 24-25. There remains £0.005m from a COVID earmarking for CHARTS
as well.
80,000 0 0
194a Non Departmental Non Departmental Council Strathclyde Pension Fund Saving 24-
25 (£2m to balance 24-25 budget)
2,000,000 0 0 0 This is part of the revenue budget for 24-25 and is the saving on pension budgets
resulting from the drop in employers pension rate.  The total of £6.875m is split as
follows: £2m to balance the budget, £3.75m allocation to capital plan, per budget
meeting 22 February 24 and the balance of £1.125m going towards what will be total
of £2m over the two years pot to be directed to transformation and projects that will
save revenue in the future.
2,000,000
194b Non Departmental Non Departmental Council Strathclyde Pension Fund Saving 24-
25 (£3.75m allocation to capital plan)
0 3,750,000 0 3,750,000 This is part of the revenue budget for 24-25 and is the saving on pension budgets
resulting from the drop in employers pension rate.  The total of £6.875m is split as
follows: £2m to balance the budget, £3.75m allocation to capital plan, per budget
meeting 22 February 24 and the balance of £1.125m going towards what will be total
of £2m over the two years pot to be directed to transformation and projects that will
save revenue in the future.
0 3,750,000
Page 150

Page 151

Ref Department Service Description Opening
Balance
Budget
Drawdown
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount
Planned to
be Spent
from
2026/27
onwards
194c Non Departmental Non Departmental Council Strathclyde Pension Fund Saving 24-
25 (£2m to be directed to transformation
and projects that will save revenue in the
future)
0 1,125,000 0 1,125,000 This is part of the revenue budget for 24-25 and is the saving on pension budgets
resulting from the drop in employers pension rate.  The total of £6.875m is split as
follows: £2m to balance the budget, £3.75m allocation to capital plan, per budget
meeting 22 February 24 and the balance of £1.125m going towards what will be total
of £2m over the two years pot to be directed to transformation and projects that will
save revenue in the future.
1,125,000
195 Non Departmental / Social Work Non Departmental Social Work Strathclyde Pension Fund
Saving 24-25
0 3,053,000 0 3,053,000 This is part of the revenue budget for 24-25 and is the saving on Social Work pension
budgets resulting from the drop in employers pension rate - to be held in Council
reserves for utilisation by the HSCP in future. 
3,053,000
196 Non Departmental Non Departmental Capital Plan 0 1,875,000 0 1,875,000 At the budget meeting on 22 February 2024, Council agreed to transfer £1.875m
from the revenue budget over to the capital plan.
1,875,000
18,509,179 3,685,312 25,181,764 10,047,636 15,134,128 13,732,948 5,061,694 10,072,434
Page 151

Page 152

APPENDIX 2
Earmarked Reserves - Service Concessions
As at 31 December 2024
Ref Department Service Description Opening
Balance
Budget
Drawdown
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount
Planned to
be Spent
from
2026/27
onwards
001 Chief Executive's Unit Community
Planning
Service Concessions - Priorities Investment
Fund (Area Plans)
200,000 86,838 113,162 13,162 100,000 As agreed by Policy and Resources Committee on 23 October 23 -
drawdown of £200,000 from the Priorities Investment Fund to fund two
temporary posts and associated costs to produce meaningful area plans
100,000 100,000 0
105 Executive Director (Kirsty Flanagan) Development and
Economic Growth
Service Concessions - Priorities Investment
Fund (Project Officer for Housing
Emergency)
200,000 0 200,000 70,000 130,000 As agreed by Policy and Resources Committee on 15 February 2024 -
drawdown of £200,000 from the Priorities Investment Fund to fund a
Project Officer to assist in accelerating the work of the Housing Emergency.
Dec 24 post holder now in place awaiting further instruction from Budget
holder
70,000 130,000 0
133 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Service Concessions - Biodegradable
Municipal Waste (BMW) Ban
3,500,000 0 3,500,000 0 3,500,000 As agreed at Council meeting 23 February 2023 - Ensuring Argyll and Bute
is able to better address the challenges faced by a remote/rural/ island
region in complying with the forthcoming national BMW ban.  
£1.5m earmarked for revenue pressures with £2m for capital projects,
mainly a Waste Transfer Station in Helensburgh.
0 3,500,000 0
138 Executive Director (Kirsty Flanagan) Roads &
Infrastructure
Service Concessions - Priorities Investment
Fund (Strategic Development Framework)
450,000 0 450,000 225,000 225,000 As agreed by Policy and Resources Committee on 15 February 2024 -
drawdown of £450,000 to procure consultancy support to assist in driving
forward the Strategic Development Frameworks.
225,000 225,000 0
153 Non Departmental Non Departmental Service Concessions - Learning Estate
Investment Strategy
8,000,000 0 8,000,000 0 8,000,000 As agreed at Council meeting 23 February 2023 - Signalling council’s
commitment to working in partnership to secure new schools for Argyll
and Bute, through substantial investment to support future-proofing of
Argyll and Bute’s schools estate.
0 8,000,000 0
154 Non Departmental Non Departmental Service Concessions - Replace previous
loans fund principal repayment holiday
5,400,000 0 5,400,000 5,400,000 0 As agreed at Council meeting 23 February 2023 - The one-off retrospective
benefit will be used to replace exercising the principal repayment holiday
that was previously agreed by Council.
5,400,000 0 0
155 Non Departmental Non Departmental Rothesay Pavilion - Capital Spends
(previously service concession)
7,438,400 0 7,438,400 1,000,000 6,438,400 Original earmarking 155 was called Service Concessions - Rothesay Pavilion
but renamed to Rothesay Pavilion - Capital spends.  At Council Meeting
September 24, it was agreed to merge the 4 capital earmarkings for
Rothesay Pavilion into one line with the narrative indicating the sources. 
Earmarkings 012, 155, 167 and 170 combined under reference 155.
ER155 - Service Concessions - Rothesay Pavilion £4.772m - As agreed at
Council meeting 23 February 2023 - Building on previous commitments to
securing a future for this building of international, national and local
significance with additional contribution to the overall funding target
which requires collective action; helping project to progress towards
success with funding that supports completion of certain work stages and
securing wind/watertight status.
ER012 - Rothesay Pavilion Essential Repairs £306k - Essential repairs to
deal with potential health and safety risks and to avoid further
deterioration.  Budget provision was approved by the Policy and Resources
Committee on 21 August 2014.
ER167 - Rothesay Pavilion (Recovery and Renewal Fund)  - £1.360m- As
agreed at Council on 24 February 2022, this is provision for future
recovery, regeneration and renewal, as well as any future pressures which
may arise following the Covid-19 pandemic through a dedicated Recovery
and Renewal Fund.
ER170 - Underwriting development of Rothesay Pavilion - Funding to meet
additional costs identified as necessary for the refurbishment of Rothesay
Pavilion (£1m).
1,000,000 6,438,400 0
Page 152

Page 153

Ref Department Service Description Opening
Balance
Budget
Drawdown
Remaining
Balance
Still to be
drawndown in
24-25
Planned to
spend in
future years
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount Planned
to be Spent in
2025-26
Amount
Planned to
be Spent
from
2026/27
onwards
156 Non Departmental Non Departmental Service Concessions - Priorities Investment
Fund
4,742,000 758,000 3,984,000 0 3,984,000 As agreed at Council meeting 23 February 2023 - Safeguarding future
investment in Priorities for Argyll and Bute by making long-term use of
service concession gain to establish dedicated fund to lever in, secure and
support key strategic investments in this year and future years.  The
opening balance is £4.742m and commitments made during 2024-25 (not
fully drawn down yet) are £0.050m for the Clipper Race and £0.944m
towards the weather incident, leaving a balance available that is not
already committed of £3.748m.
758,000 3,984,000 0
157 Non Departmental Non Departmental Service Concessions - Roads Investment to
Capital
3,546,000 0 3,546,000 0 3,546,000 As agreed at Council meeting 23 February 2023 - Augmenting overall
allocation for roads repair and maintenance programme with additional
funds to bring up to £8m total investment for 2024/25.
0 3,546,000 0
163 Non Departmental Non Departmental Service Concessions - Capital Projects
Inflation Pressures
2,000,000 0 2,000,000 0 2,000,000 As agreed at Council meeting 23 February 2023 -Boosting resilience of
Capital Programme and providing added support as required for key
capital/infrastructure projects - £2m.
Further allocation agreed Council meeting 22 February 24 - increase capital
contract earmarking to protect current capital projects in plan £0.297m
0 2,000,000 0
169 Non Departmental Non Departmental Service Concessions - Priorities Investment
Fund (Capital Programme)
1,028,000 0 1,028,000 0 1,028,000 As agreed by Council on 22 February 2024- transfer of £1,028,000 from the
Priorities Investment Fund to the Capital plan
1,028,000 0
173 Non Departmental Non Departmental Service Concessions - New refuse collection
vehicles
700,000 0 700,000 700,000 0 As agreed at Council meeting 23 February 2023 - Enhancing waste and
recycling uplift arrangements through placing orders for new refuse
vehicles.
700,000 0 0
175 Non Departmental Non Departmental Service Concessions - Climate Change 640,000 27,185 612,815 0 612,815 As agreed at Council meeting 23 February 2023 - Continuing our track
record of investing in climate change with funding to further enhance
school estate climate change measures, with allocations for primary and
secondary schools across the area in Campbeltown, Dunoon, Helensburgh,
Lochgilphead, Oban and Rothesay.
27,185 612,815 0
182 Non Departmental Non Departmental Service Concessions - New Jet Patcher
Vehicle
250,000 0 250,000 250,000 0 As agreed at Council meeting 23 February 2023 - Complementing multi-
million pound capital investment in roads repair and maintenance with
new jet patcher order to support delivery of programme.
250,000 0 0
183 Non Departmental Non Departmental Service Concessions - New Road Marking
Vehicle
230,000 0 230,000 0 230,000 As agreed at Council meeting 23 February 2023 - Completing suite of
investments in new fleet procurement, to support delivery of roads repair
and maintenance programme, with order for additional road marking
vehicle.
0 230,000 0
38,324,400 872,023 37,452,377 7,658,162 29,794,215 8,530,185 29,794,215 0
Page 153

Page 154

APPENDIX 3     
Risk Assessment for Review of Reserves
Risk Category Comment Assessment
Cost and Demand
Pressures
As part of maintaining the medium term budgetary outlook, cost and
demand pressures for 2025-26 and beyond have been kept under review. 
The cost and demand pressures for 2025-26 amount to £4.771m for
Council services.  A general allowance for unidentified cost and demand
pressures has been built into the budget outlook for 2026-27 and future
years:  £0.250m in the best case scenario, £0.500m per annum in the mid-
range, and £1m per annum in the worst case scenario. 
Medium
(2024-25 Medium)
Service Income Service income levels have been reviewed as part of constructing the
budget. In addition fees and charges have been reviewed. 
Medium
(2024-25 Medium) 
Council Wide Cost
Risks
The financial risk analysis identified 7 council wide cost risks currently
amounting to £8.1m as follows: 
Description  Likelihood
Assessed
Financial
Impact
£m
Unbudgeted Severe Weather costs 3 2.0
Pay Award exceeding 3% 3 1.8
Energy costs increase by 5% greater than
budgeted
3 0.4
IJB refer to Council for additional funding to
deliver social work services 
3 2.6
1% variation in Council Tax Income 2 0.7
10% shortfall on Savings delivery 2 0.3
Medium/High
(2024-25 Medium) 
Page 154

Page 155

Risk Assessment for Review of Reserves
Risk Category Comment Assessment
10% variation on General Inflation 3 0.3
Total     8.1 
Funding Risks The Scottish Budget was announced on 4 December 2024 and the finance
circular with the local authority allocations issued on 12 December 2024.
After settlement commitments there is an increase to General Revenue
Grant of £3.685m for Argyll and Bute Council.  The level of increase for
2025-26 was unexpected and it was significant in comparison to previous
years, however, it is difficult to suggest that we should assume increases
like this in future years.  The mid-range scenario has been adjusted to a
0.25% decrease in funding for future years, reflecting the fact that we rely
on the floor mechanism which is currently set at 0.75% below the average
change in funding.   
The Cabinet Secretary for Finance and Local Government announced on
Tuesday 4 February 2025 that Scottish Government has now agreed to
provide an additional £144m to Local Government in respect of Employer’s
National Insurance increase (representing funding of 60% of the cost).   
On 29 November 2024 the Council received a letter from the Department of
Environment Food and Rural Affairs (DEFRA) providing our authority’s
estimated payment amount of £3.847m.  The estimated payment amount is
provisional and subject to further review and adjustment with the final
allocation confirmed in Autumn 2025.  As part of the revenue budget
outlook, it is recommended that part of this indicative funding is not
committed and is carried forward to 2026-27 until the requirements attached
to the funding are clear.   
Medium/High
(2024-25 Medium/High) 
Page 155

Page 156

Risk Assessment for Review of Reserves
Risk Category Comment Assessment 
There is a proposed increase to Council Tax of 8.9% to balance the budget. 
Collection rates remain good at circa 96%. 
As a result of all issues noted above, this risk has been kept as
Medium/High. 
Savings Risks The 2025-26 budget includes both Operational/Management and Policy
savings options, totalling £3.093m.  Whilst the council has a good track
record in delivering savings, there is a risk that this target will not be fully
delivered.  Risk remains at medium. 
Medium
(2024-25 Medium) 
Inflation Rates CPI Inflation was 2.5% in December 2024, a reduction which was largely
unexpected by economists. In its Monetary Policy Committee report
published in November 2024, the Bank of England reported that it expects
CPI inflation to increase slightly during 2025/26 and will hover in the range
2.6% to 2.8% over the year. 
Given the ongoing challenges facing the UK economy it would be prudent to
consider the risk that inflation will be higher than forecast and a Council
wide risk has been identified of £0.300m. For 2025-26, despite the overall
rate of inflation being forecast to be relatively stable over the year, officers
expect that inflationary pressures will continue to be a point of financial
pressure throughout the year and Finance staff will work in conjunction with
Services to monitor the situation very closely. 
Medium/High
(2024-25 Medium/High) 
Interest Rates The council’s debt portfolio is largely long term borrowing for capital
purposes at fixed interest rates, with a mixed maturity profile, minimising
exposure to interest rate risk in terms of interest rate volatility, over future
Low
(2024-25 Low) 
Page 156

Page 157

Risk Assessment for Review of Reserves
Risk Category Comment Assessment
years.  The council holds both short term or temporary borrowing and
investment balances to manage day to day cashflow requirements.     
The treasury position is actively managed to reduce debt interest costs and
maximise the return on investments, commensurate with the council’s risk
appetite and within the limits of the approved Treasury Management and
Annual Investment Strategies.  Further, the council continues to hold
significant reserve balances, which has allowed the deferral of new external
borrowing, in favour of internal borrowing.  This is a prudent strategy, where
interest rates are forecast to fall across future years, which both provides an
opportunity for longer term interest cost savings and minimises investment
risk.  The council continues to monitor interest rate markets and forecasts
and undertakes borrowing and investment decisions based on advice from
its treasury advisors, MUFG (formerly Link). 
Investment risks The authority will aim to achieve the optimum return (yield) on its investments,
commensurate with proper levels of security and liquidity.  The risk appetite
of the council is low, prioritising security and liquidity.  In the current economic
climate, it is considered appropriate to keep investments short term to cover
cash flow needs.  Investments are placed with high credit quality financial
institutions, using the MUFG suggested creditworthiness approach, including
a minimum sovereign credit rating and Credit Default Swap (CDS) overlay
information.   
As outlined above, the level of internal reserve fund balances has provided
an opportunity to defer new external borrowing, whilst also minimising
exposure to investment risk. 
Low
(2024-25 Low) 
Page 157

Page 158

Risk Assessment for Review of Reserves
Risk Category Comment Assessment
Strategic risks The strategic risk register is subject to a formal review by SMT bi-annually,
and these reviews have already taken place in April and October of 2024.  
SMT have agreed the current actions to address the risks. 
Medium
(2024-25 Medium)
Operational risks Operational risks are reviewed formally each quarter by Departmental
Management Teams.  Any operational risks that are identified as high are
reported to the Strategic Management Team as part of the bi-annual review
of the Strategic Risk Register.  
Medium
(2024-25 Medium)
World Events World events are likely to continue to affect the global economy (Covid
pandemic, UK exit from EU, Russian invasion of Ukraine) causing market
and price instability through, for example, disruptions to supply chains which
lead to delays and reducing the availability of goods and services which
increases prices. 
New Risk
Medium/High
General financial
climate
The finance settlement only covers 2025-26 and the Scottish Government is
still to meet its commitment to provide a three-year settlement.  A prudent
approach to estimating income from council tax has been taken. Risks
arising from inflation, interest rates, cost pressures and demand led
pressures have been outlined above. 
Due to ongoing uncertainties regarding the level of funding from Scottish
Government, the risks to the UK economy and the sensitivity of interest
rates to world events, it would be prudent to retain this risk at medium/high. 
Medium/High
(2024-25 Medium/High) 
Availability of
contingency funds
The Council had sufficient contingency funds to meet its target.  Based on
the current forecast outturn and the proposed budget for 2025-26, the
Council may enter into contingency.  There are significant earmarked
reserves and if required, these will be assessed to see if there are any
Low/Medium
(2024-25 Low)
Page 158

Page 159

Risk Assessment for Review of Reserves
Risk Category Comment Assessment
further reserves that can be released back to the General Fund.  This risk
has been updated to low/medium due to the low level of unallocated
General Fund.   
Overall financial
standing 
The Council has managed to achieve its contingency target in previous
years. Actual costs are normally contained within budget.  Borrowing costs
are largely fixed at the moment, as the Council’s need to borrow is currently
low due to the high levels of funds it is holding. In addition to the
contingency there are significant earmarked funds. Cost and demand
pressures are identified and provided for if necessary and the impacts of
inflationary changes are continually monitored and adjusted for in the
Council’s financial forecasts. 
Low/Medium
(2024-25 Low/Medium) 
Track record in
budget management
The Council had a good track record of containing expenditure within
budget, however, this year as at the end of December 2024 the Council is
forecasting an overspend due to some unforeseen costs.  This is subject to
change as there are still 3 months of the financial year left and it is expected
there will be unbudgeted costs incurred as a result of Storm Eowyn on 24
January 2025.   As a result this risk has been increased to Medium.   
Medium
(2024-25 Low) 
Financial information
and reporting
arrangements
Revenue and capital budgets are monitored on a monthly basis with budget
allocated to responsible managers. A risk-based approach is taken to
budget monitoring and the budget monitoring process is continually being
reviewed to identify ongoing improvements. 
Low/Medium
(2024-25 Low/Medium) 
Insurance cover The Council has adequate insurance cover. Low
(2024-25 Low) 
Page 159

Page 160

Risk Assessment for Review of Reserves
Risk Category Comment Assessment
Internal controls The statement of internal controls identifies a generally adequate control
framework although there are areas for improvement. An audit plan is
approved and delivered each year to monitor internal controls. The
Council’s Audit and Scrutiny Committee continues to actively develop and
adopt good practice. 
Low/Medium
(2024-25 Low/Medium) 
Health and Social
Care Partnership
Financial Position
It is prudent to have a factor in terms of the Health and Social Care
Partnership financial position.  It is the responsibility of the Chief Officer and
Chief Financial Officer to manage the HSCP financial position.  If an
overspend is forecast, a budget recovery plan will be prepared and
submitted to the IJB, the Council and NHS Highland.  Where recovery plans
are unsuccessful and an overspend occurs at the financial year end, and
there are insufficient reserves to meet the overspend, then the partners will
be required to make additional payments to the HSCP.  The Council would
have to contribute towards any overspend related to Social Work.  Whilst
any additional payments by the Council and NHS Highland will be deducted
from future years funding, there is still a financial risk that the Council may
have to pay out additional monies in year.   The financial situation facing
Social Work is extremely challenging due to increases in demand,
complexity of cases, increasing costs and difficulty recruiting permanent
staff and therefore having to rely on agency staff.  At the time of writing this
report, the forecast budget for 2025-26 has a £1.3m gap, after accounting
for additional contributions from the Council in respect of ENICs and pay
award.  There also is a risk in respect of commissioned providers ENICs
costs which equates to around £1.3m.  As a result of these risks, the risk
assessment has been increased to Medium/High for 2025-26.   
Medium/High
(2024-25 Medium)
Impact of Climate
Change
Climate change is expected to have an increasingly significant and
damaging impact on coastal communities in the West of Scotland with
New Risk
Medium/High
Page 160

Page 161

Risk Assessment for Review of Reserves
Risk Category Comment Assessment
changes in sea level and weather patterns, through a combination of more
frequent and intense storms, increasing the risk of flooding and damage to
homes and infrastructure. With its unique geography, with numerous islands
and exposed coastline, Argyll and Bute is especially vulnerable with severe
storms in October 2023 and January 2025 causing substantial damage to
infrastructure and property and jeopardising the safety of residents. 
The Councils plays a crucial role in reducing the impact of climate change
by implementing sustainable policies, enhancing infrastructure resilience
and promoting community awareness.  Page 161

Page 162

This page is intentionally left blank

Page 163

ARGYLL AND BUTE COUNCIL COUNCIL
FINANCIAL SERVICES 27 FEBRUARY 2025
CAPITAL PLAN 2025-28 SUMMARY REPORT 
1. EXECUTIVE SUMMARY 
1.1  This report outlines proposals for the roll forward of the current 3 year Capital
Plan 2024-27 by 1 year, incorporating updated funding assumptions, new
spending proposals, and the re-phasing of total programme spend across the 3
years of the new Capital Plan 2025-28. 
1.2 Funding constraints have put significant pressure on the ability to deliver capital
investment.  In addition, the capital programme continues to see significant price
increases, as well as disruptions to the supply chain and longer lead in times,
due to the impact of world events (Covid pandemic, UK exit from EU, Russian
invasion of Ukraine) on the global economy.  These impacts make it extremely
challenging to manage the delivery of the capital programme within available
resources and target completion timescales.   
1.3 The Local Government Finance Settlement Circular 12/2024 provided 2025-26
General Capital Grant of £9.666m, excluding effectively ring-fenced or directed
funding of £1.198m.  This represents £0.832m more than previous planning
assumptions.  However, the 2024-25 final General Capital Grant settlement was
£0.047m lower than assumed within the approved Capital Plan.  There is,
therefore, a net increase in capital resources of £2.449m overall for the 3 years
2025-28. 
1.4  The ring-fenced or directed funding of £1.198m, included within the General
Capital Grant, comprises £0.632m for Campbeltown Flood Scheme, £0.391m for
Play Parks and £0.175m for Nature Restoration Fund.  There is also a specific
grant of £0.383m available for Active Travel (formerly known as Walking Cycling
& Safer Streets).   
1.5 
1.6
The amount of capital resources effectively top-sliced from the General Capital
Grant and allocated to Private Sector Housing Grant (PSHG) is provided for at
£1.033m per annum over the 3 years 2025-28, similar to previous years’ levels,
although the funded GAE level has reduced to £0.707m in 2025-26.  In addition,
a GAE equivalent amount of £0.156m per annum is directed to flooding projects. 
The balance of the available 2027-28 General Capital Grant, assumed for
planning purposes (£7.645m), has been allocated across Priority Investment
Plans on an agreed block allocation formula basis, in line with previous years.   
The settlement also provides for additional, non-recurring capital grant funding of
£40m across Scotland in 2025-26 for Climate Emergency, to be included within
the General Capital Grant.  Given that project planning across the programme
will already take cognisance of climate change, as a key consideration, it has not
Page 163 Agenda Item 3a

Page 164

been necessary to augment planned project expenditure in this respect.  As
such, this funding represents additional available resources for 2025-26.   
1.7 
1.8 
1.9 
1.10 
1.11
There is a rolling 3 year target for capital receipts from asset sales, forming part
of the overall funding framework for the 2025-28 Capital Plan.  The level of
receipts that may reasonably be achieved over the 3 years 2025-28 totals
£1.750m, profiled £0.750m 2025-26 and £0.500m across each of the years
2026-27 and 2027-28.  Additional unbudgeted capital receipts of £0.040m from
vehicle sales has also been achieved during 2024-25.  This represents an
overall increase of £0.640m in available funding for capital investment over the 3
years 2025-28. 
Project specific grant funding and other capital contributions are accounted for
within specific projects.  Project approved gross expenditure and income are
increased by the same amount, with no impact on project net expenditure. 
Similarly, project gross expenditure may be augmented by the level of
earmarked reserve balances used to fund programme net expenditure, with no
impact on required borrowing. 
As at 31 December 2024, there is a forecast overspend of £0.117m on the
current 2024-27 Capital Plan.  In addition, spending requirements deemed to be
essential, either critical to maintain service delivery, or to comply with legislation
or regulation (Red RAG status risks), total an estimated £0.376m. 
After taking account of budget pressures and proposed allocations, the balance
of additional capital resources, available for additional capital investment over
the 3 years 2025-28 is £3.560m.  This may be augmented by additional
borrowing for capital purposes, with the revenue consequences, in terms of debt
charges, accounted for as part of the annual revenue budget for 2025-26 and
future years.  There is also an option to redirect resources, allocated but not yet
committed, to other priorities, including in respect of the allocation to PSHG at
the historic, above GAE level.   
A range of currently unfunded investment priorities across council services have
been identified, including in respect of the Roads Maintenance programme for
2025-26, with an estimated funding shortfall of £9m to maintain current level
standards. 
1.12 
1.13
A number of known risks, specifically related to the delivery of the Capital Plan,
are documented within this report.  These risks may impact the delivery of the
plan within available resources and target timescales.   
It is recognised that there are opportunities to take a more strategic approach to
capital planning and to enhance existing governance arrangements around
capital investment activity.  This will be further explored during 2025-26.   
Page 164

Page 165

ARGYLL AND BUTE COUNCIL COUNCIL
FINANCIAL SERVICES                                          27 FEBRUARY 2025
CAPITAL PLAN 2025-28 SUMMARY REPORT 
2. INTRODUCTION 
2.1  This report outlines proposals for the roll forward of the current 3 year Capital
Plan 2024-27 by 1 year, incorporating updated funding assumptions, new
spending proposals, and the re-phasing of total programme spend across the 3
years of the new Capital Plan 2025-28. 
3. DETAIL 
3.1 Capital Funding Changes 2025-28 
3.1.1 
3.1.2 
3.1.3 
3.1.4 
The Local Government Finance Circular 10/2024, published on 12 December
2024, provides details of the provisional total capital funding allocations for
2025-26. The provisional total funding allocations form the basis for the annual
consultation between the Scottish Government and COSLA, ahead of the Local
Government Finance (Scotland) Order 2024 presented to the Scottish
Parliament.  The Finance Order was laid in Parliament on 4 February with
Stages 1-3 between 4 February and 25 February with the Finance Order
Debate taking place on 27 February.   
Funding constraints have put significant pressure on the ability to deliver capital
investment.  In addition, the capital programme continues to see significant
price increases, as well as disruptions to the supply chain and longer lead in
times, due to the impact of world events (Covid pandemic, UK exit from EU,
Russian invasion of Ukraine) on the global economy.  These impacts make it
extremely challenging to manage the delivery of the capital programme within
available resources and target completion timescales. 
The 2024-27 Capital Plan, approved in February 2024, included future year
General Capital Grant assumptions for 2025-26 and 2026-27 at the actual
2024-25 level of £8.834m.  This estimation was based on the Capital Spending
Review undertaken by Scottish Government which advised that the capital
settlements were likely to stay constant over the next five years (2021-22 to
2025-26). 
The Local Government Finance Settlement Circular 12/2024 provided 2025-26
General Capital Grant of £9.666m, excluding effectively ring-fenced or directed
funding of £1.198m.  This represents £0.832m more than previous planning
assumptions.  However, the 2024-25 final General Capital Grant settlement
Page 165

Page 166

3.1.5 
3.1.6 
3.1.7 
was £0.047m lower than assumed within the approved Capital Plan.  There is,
therefore, a net increase in capital resources of £2.449m overall for the 3 years
2025-28. 
The ring-fenced or directed funding of £1.198m, included within the General
Capital Grant, comprises £0.632m for Campbeltown Flood Scheme, £0.391m
for Play Parks and £0.175m for Nature Restoration Fund.  There is also a
specific grant of £0.383m available for Active Travel (formerly known as
Walking Cycling & Safer Streets).  Project expenditure plans, matched by these
funding streams, will be built into the capital programme. 
The amount of capital resources effectively top-sliced from the General Capital
Grant and allocated to Private Sector Housing Grant is provided for at £1.033m
per annum over the 3 years 2025-28.  This amount has remained at the same
level since 2016-17, however, the GAE level, included within the 2025-26
General Capital Grant is now £0.707m.  Members may wish to review the
amount allocated to PSHG and this is explored further within Section 3.5 of this
report.  In addition, a GAE equivalent amount of £0.156m per annum is directed
to flooding projects. 
The settlement also provides for additional, non-recurring capital grant funding
of £40m across Scotland in 2025-26 for Climate Emergency, to be included
within the General Capital Grant.  Whilst the distribution across individual
authorities has yet to be confirmed, based on the expected distribution formula,
additional funding of £0.964m has been assumed within the Capital Plan for
2025-26.  Given that project planning across the programme will already take
cognisance of climate change, as a key consideration, it has not been
necessary to augment planned project expenditure in this respect.  As such,
this funding represents additional available resources for 2025-26.  
3.1.8 
3.1.9
There is a rolling 3 year target for capital receipts from asset sales, forming part
of the overall funding framework for the 2025-28 Capital Plan.  This is based on
an assessment undertaken by Commercial Services on potential sales
opportunities, now extending another year through to 2027-28.  There is an
estimated overall increase in capital income across the programme of £0.600m
in this respect.  The level of receipts that may reasonably be achieved over the
3 years 2025-28 totals £1.750m, profiled £0.750m 2025-26 and £0.500m
across each of the years 2026-27 and 2027-28.  The assets available for sale
are listed in Appendix 1.  Additional unbudgeted capital receipts of £0.040m
from vehicle sales has also been achieved during 2024-25.  This represents an
overall increase of £0.640m in available funding for capital investment over the
3 years 2025-28. 
Project specific grant funding and other capital contributions are accounted for
within specific projects.  Project approved gross expenditure and income are
increased by the same amount, with no impact on project net expenditure. 
Similarly, project gross expenditure may be augmented by the level of
earmarked reserve balances used to fund programme net expenditure, with no
impact on required borrowing. Details of project specific capital income, totalling
£13.302m and reserve balances earmarked to fund capital expenditure,
totalling £10.607m over the 3 years 2025-28 are outlined within Appendix 2.   
Page 166

Page 167

3.2 
3.2.1 
3.2.2
New Capital Commitments and Resource Allocations 
As at 31 December 2024, there is a forecast overspend of £0.117m on the
current 2024-27 Capital Plan.  In addition, spending requirements deemed to be
essential, either critical to maintain service delivery, or to comply with legislation
or regulation (Red RAG status risks), total an estimated £0.376m (£0.305m
Riverside Leisure Centre and £0.071m ICT).  Members are requested to
approve the allocation of additional resources totalling £0.493m in respect of
these items. 
In order to support early capital planning, an indicative block allocation from the
General Capital Grant for a further year, 2027-28 was provided, allowing the
development of Priority Investment Plans across a range of service categories. 
After allowing for an allocation to Private Sector Housing Grant and flooding
projects, a 2027-28 balance of £7.645m, assumed for planning purposes, has
been allocated across Priority Investment Plans (PIPs).  This is based on an
agreed block allocation formula, in line with previous years.  PIPs outline
spending proposals to meet service priorities and also provide details of
currently unfunded service aspirations.  Details of the 2027-28 General Capital
Grant block allocations are outlined in the table below.  Members are requested
to approve these resource allocations. 
Service % Share £000 
Education 26% 1,988
Customer Services - IT 9% 688
Customer Services - Facilities 5% 382
Roads & Infrastructure Services 50% 3,823
Social Work (HSCP) 5% 382
LiveArgyll 5% 382
Total 2027/28 GCG Block Allocation 100% 7,645
Private Sector Housing Grant (Top-sliced)  1,033
Flooding – General (Top-sliced)  156
Total 2027/28 GCG (Planning Assumption)  8,834 
Page 167

Page 168

3.3 
3.3.1 
3.3.2 
Updated Capital Plan 
As part of the capital planning process, services have reviewed project costs
and spending profiles and re-profiled total resources, comprising existing
approvals and new 2027-28 block allocations, across the 3 years of the Capital
Plan 2025-28. 
The table below provides a summary of the updated Capital Plan 2025-28
planned investment or gross expenditure, subject to member approval of new
spending commitments and block allocations outlined within Section 3.2 of this
report, while a more detailed breakdown is given within Appendix 3.  This is
prior to the allocation of any additional resources, explored within Section 3.5 of
this report.   
2025-26
£m
2026-27
£m
2027-28
£m
Total
£m
Executive Directorate (Douglas
Hendry):        
Education 2.946 1.988 1.988 6.922
Facility Services - Shared Offices 3.681 0.667 0.382 4.730
Major Projects/CHORD 10.865 10.018 0.000 20.883         
Executive Directorate (Kirsty
Flanagan):       
ICT 1.352 0.820 0.688 2.860
Roads and Infrastructure 48.500 39.110 33.979 121.589
Development and Economic
Growth 1.104 0.000 0.000 1.104         
Health and Social Care
Partnership 2.084 0.000 0.382 2.466         
Live Argyll 0.474 0.468 0.382 1.324         
Total 71.006 53.071 37.801 161.878 
3.3.3  After accounting for project specific capital income of £13.302m, as outlined at
paragraph 3.1.9, the net expenditure on the capital programme that requires to
be funded totals £148.576m over the 3 years 2025-28.  This funding framework
comprises General Capital Grant, capital receipts from asset sales and capital
funded from current revenue or earmarked reserves, with the balance to be met
from borrowing.   
Page 168

Page 169

3.3.4 
Details of the funding framework for capital net expenditure over the 3 years
2025-28 is set out in the table below. 
2025-26
£m
2026-27
£m
2027-28
£m
Total
£m
Net Capital Expenditure 62.704 48.071 37.801 148.576
Funded by:        
General Capital Grant 11.178 8.633 8.633 28.444
Asset Sales 0.750 0.500 0.500 1.750
Earmarked Reserves/Revenue 5.577 5.030 0.000 10.607
Borrowing 45.199 33.908 28.668 107.775
Total Funding 62.704 48.071 37.801 148.576 
3.3.5 
3.3.6 
3.4 
3.4.1 
There are a number of projects where the annual debt charges are expected to
be fully offset by revenue budget savings, either through increased income or
reduced expenditure, over the useful life of the project deliverables, with no
impact on Council Tax.  This is generally referred to as prudential borrowing and
accounts for £100.593m of the overall borrowing requirement in the above table,
largely in respect of the Harbour Investment Programme. 
The estimated gross capital expenditure and borrowing requirement over the 3
years 2025-28, arising from the 2025-28 Capital Plan, are reflected within the
Capital and Prudential Indicators 2025-28, set out within the council’s 2025-26
Treasury Management Strategy.  Revenue implications of borrowing in respect
of future debt repayments are provided for within the council’s revenue budget
forecasts for 2025-26 and future years.   
Unfunded Priorities 
The priority investment planning process has identified a number of currently
unfunded priorities, broadly comprising the following: 
• An estimated funding shortfall in Roads Maintenance of £9m.  This is the
estimated additional level of investment that would be required to
maintain roads to the current level standard (steady state), based on an
estimated cost of £11m at current prices, compared to a planned level of
investment from the block allocation of £2m for 2025-26; 
• An estimated funding shortfall in Footway Maintenance of £950k, on a
similar basis to that of Roads Maintenance; and 
• Indicative cost estimates that require to be refined, and profiled over
2025-26 and future years, in respect of a number of other identified
service priorities.  These are largely in respect of Asset Sustainability and
include investment in Sports Facilities, Fleet, Waste, Airports, Flood Risk
Management, and Bridges and Coastal Protection. 
More detailed information on the Priority Investment Plans (PIPs) is contained
within a separate report on the Corporate Asset Management Strategy and
Plan.
Page 169

Page 170

3.4.2 
3.5 
3.5.1 
Members may wish to consider additional investment for currently unfunded
service priorities.  Funding options and considerations in this respect are
outlined in the following section. 
Additional Investment Considerations 
After taking account of new planned spending commitments and block
allocations, the balance of additional capital resources, available for further new
capital investment over the 3 years 2025-28 is £3.560m, as detailed in the table
below.     
£000
Decrease to 2024-25 GCG (47)
Increase to 2025-26 GCG  832
Increase to 2026-27 and 2027-28 GCG Assumption 1,664
2027-28 GCG Assumption (2024-25 level) 8,678
2027-28 PSHG Allocation (1,033)
2027-28 Block Allocation (PIP Process) (7,645)
Climate Emergency Fund (One-off – will go into
GCG)
964
Current Capital Plan Forecast Overspend (117)
Red Risks (Regulatory, Critical) (376)
Additional Asset Sales  640
Net Total Available Resources 3,560 
3.5.2 
3.5.3 
Council requires to consider the allocation of available resources of £3.560m, in
light of the unfunded investment priorities set out within paragraph 3.4.1.  This
available resource reflects the balance remaining from the estimated additional
capital income, after providing for planned spending commitments and
allocations, over the 3 years 2025-28.  There is, therefore, no impact on the
revenue budget in this respect. 
As set out at paragraph 3.1.6 of this report, the level of resources top-sliced
from the GCG and allocated to PSHG is currently planned at the historic level of
£1.033m.  However, it should be noted that the indicative GAE level, funded
from within General Capital Grant, has reduced to £0.707m in 2025-26, while
the average annual spend in recent years equates to circa £0.820m.  A
reduction to the average spend level over each of the 3 years would result in
additional resources of £0.640m being made available for redirection.  There is
Page 170

Page 171

3.5.4
also an option to redirect resources, allocated through the block allocation but
not yet committed, to other council priorities. 
There is also an opportunity to fund additional capital investment through
additional borrowing.  However, the revenue consequences, in terms of
increased debt charges, would require to be accounted for as part of the annual
revenue budget for 2025-26 and across future years.  For illustrative purposes,
every £1m of additional borrowing for capital purposes creates an annual
revenue budget pressure of circa. £0.065m, on average. 
3.6 
3.6.1 
3.6.2 
3.6.3 
3.6.4 
Capital Plan Risks 
The finance circular received on 12 December 2024 provided details of
government grant funding for 2025-26.  There is, therefore, a degree of certainty
in respect of General Capital Grant and available specific capital grant funding
for 2025-26.  However, there is a risk that future years grant settlements will be
below the 2025-26 level, assumed in the Capital Plan for 2026-27 and 2027-28. 
Also, at the time of writing, the council’s share of an additional £40m Climate
Emergency Fund, to be paid as General Capital Grant, has still to be confirmed. 
The Capital Plan has assumed additional funding of £0.964m in this respect. 
Any variation in the final allocations from these assumptions will require to be
managed within the overall Capital Plan resources. 
The funding framework for the approved Capital Plan includes capital receipts
from asset sales, estimated at £0.750m in 2025-26 and £1.750m over the 3
years 2025-28.  This is based on an assessment provided by the Estates Team
in January 2025, however, is subject to changing market conditions.  The level
of receipts that may reasonably be achieved will be kept under review, to reflect
changing market conditions and due diligence undertaken on asset condition. 
Any variation from this assumption will require to be managed within the overall
Capital Plan resources. It is generally the case that the capital programme
experiences slippage throughout the year and as such, this risk is expected to
be manageable. 
As capital project approvals are based largely on early indicative cost estimates,
there is a risk that actual costs will be more than originally planned, particularly
in the current economic climate and where there has been unavoidable project
delays.  The capital programme continues to see significant price increases, as
well as disruptions to the supply chain and longer lead in times, due to the
impact of world events (Covid pandemic, UK exit from EU, Russian invasion of
Ukraine) on the global economy. Additional funding of £11m, made available to
manage these impacts to date, has now been fully allocated.  There are likely to
be other significant cost pressures in respect of projects, where contracts have
yet to be entered into, which are not quantifiable, at this stage.  It will be
challenging to manage these impacts within available resources and target
completion timescales. 
The Capital Plan monitoring report, as at 31 December 2024, outlines a forecast
overspend on the 2024-27 Capital Plan of £0.117m.  Members are requested to
approve additional resources in this respect, as part of the 2025-26 budget
process, as outlined in Section 3.2 of this report. 
Page 171

Page 172

3.6.5 
3.6.6 
3.6.7 
3.6.8 
3.7 
3.7.1 
The council’s funding bid to the Scottish Government’s Learning Estate
Investment Programme (LEIP) for a new school campus on Mull was
successful. While this is good news and will provide welcome investment in the
school estate, it will not meet the full cost of the project.  The funding gap
requires to be met by the council and presents a financial pressure. The
Scottish Government will fund up to 50% of eligible costs, with the balance of
circa. £20m to be funded by the council.  No specific provision has been
included within the 2025-28 Capital Plan in this respect, at this stage. 
There is a risk of further severe weather incidents, requiring both revenue and
capital expenditure to be incurred.  Whilst there may be additional funding
available through the Bellwin Scheme, this is limited to eligible revenue
expenditure only.  There is no provision for potential additional costs in this
respect within the 2025-28 Capital Plan.  This risk is considered as part of the
council’s policy on the level of the general contingency balance held within the
unallocated General Fund reserve. 
Following the weather event in October 2023 a temporary emergency road was
constructed at the A816 Bealach Mor, Kintraw, Ardfern.  Due to the future stability
of the hillside, the plan is for permanent diversion onto a widened alignment of
the emergency route.  Funding of £1.1m is already provided for within the capital
plan however this may not be sufficient.  A feasibility options report is being
prepared and a preferred option will be presented for approval following which
ground investigation and consultations with stakeholders will take place to inform
the design and build contract.  A design and build contract shall be prepared and
tendered and any shortfall in budget will be determined.   
The monitoring and review of these risks will continue to be undertaken on an
ongoing basis, with actions put in place to continue to mitigate or manage these
risks, as far as possible.  Actions to manage financial risk within available
resources may include re-profiling; project redesign, re-engineering or
curtailment, and the re-prioritisation of uncommitted resources across the
programme.  An update on risks will be reported regularly to Policy and
Resources Committee, as part of future capital programme monitoring reports. 
Opportunities for Improvement 
It is recognised that there are opportunities to take a more strategic approach to
capital planning and to enhance existing governance arrangements around
capital investment activity.  The Executive Leadership Team is committed to
undertaking a future review and recommendations will be reported to members
during 2025-26 in this respect.  Whilst the detailed specification of requirements
of the review has still to be developed, at this stage, it is anticipated that the
review will include the following: 
▪ Enhanced governance arrangements, including greater member
involvement in the allocation of capital resources.  This would include a
review of current Priority Investment Plans and whether they remain fit
for purpose in their current format and provide Members with sufficient
information for decision making; 
Page 172

Page 173

4.
▪ Longer term financial planning, including longer term Capital Plan (5-10
years); 
▪ Integrated capital forecasting, treasury strategy and debt charges
(revenue budget) modelling; 
▪ A review of the capacity within the current debt charges budget for
additional investment, reflecting capital planning and treasury borrowing
assumptions; and 
▪ An updated Capital Strategy, to help ensure that we are investing in our
infrastructure, to support council key strategic priorities. 
CONCLUSIONS 
4.1 
4.2 
4.3 
4.4
The 3 year Capital Plan has been rolled forward another year, now covering the
period 2025-28.  Funding assumptions; planned spending commitments,
including block allocations across services; and profiling across 2025-26 and
future years have been updated for the Capital Plan period 2025-28.   
Subject to member approval of planned spending commitments and block
allocations, there is a balance of £3.560m additional capital resources available,
to be allocated to increase levels of planned investment in service priorities. 
There are opportunities to augment the level of additional resources available
for increased investment in the highest priorities, through review and redirection
of planned resource allocations, not yet committed, and from additional
borrowing, as set out at paragraphs 3.5.4 and 3.5.4 of the report.   
There are a number of specific capital programme risks that require to be
monitored and reviewed on an ongoing basis, and which will require to be
managed within available resources.   
Opportunities to enhance current capital arrangements will also be explored,
with recommendations to be reported to members, following a review to be
undertaken during 2025-26. 
5. IMPLICATIONS 
5.1 Policy – Sets out the approach to capital planning. 
5.2 Financial – Outlines the planned capital investment and funding for the capital
planning period 2025-28. 
5.3 Legal - Statutory and Regulatory requirements in relation to Health and Safety
have been provided for within capital spending plans.   
5.4 HR - There are risks that the funding available will have an impact on the
sustainability of the Property Design Team and the design team within Roads and
Amenity Services. 
5.5 Fairer Scotland Duty:
Page 173

Page 174

5.5.1
5.5.2
5.5.3
Equalities – Impacts will be considered as appropriate.
Socio-Economic Duty – Impacts will be considered as appropriate. 
Islands Duty – Islands duty is considered as part of the Equality and Socio-
Economic Impact Assessments 
5.6 Climate Change – The council is committed to addressing climate change, within
the available budget resources. 
5.7 Risk - There are a number of risks impacting the delivery of the Capital Plan within
available resources and target timescales, which require to be monitored on an
ongoing basis. 
5.8 Customer Service – None. 
5.9 The Rights of the Child (UNCRC) - None   
Kirsty Flanagan
Executive Director/Section 95 Officer
13 February 2025 
Councillor Ross Moreland - Policy Lead for Finance and Commercial
Services 
APPENDICES:
Appendix 1 - Proposed Asset Disposals
Appendix 2 -  Project Specific Capital Income and Earmarked Reserves
Appendix 3 - Proposed Capital Investment 2025-28 
For further information please contact:
Carolyn Earl, Acting Head of Financial Services 
carolyn.earl@argyll-bute.gov.uk
Page 174

Page 175

Appendix 1 - Proposed Asset Disposals 2025-28
Property
Shop, 3 Montague Street
Ardchonnel Primary School
Skipness Primary School
Hill Street office
Achaleven Primary School
Minard Primary School
Southend Primary School
Former Registrar Office, Witchburn Road
Witchburn Road site, former Finance Office
Ground at 125 Frederick Street
Former Lochgilphead Primary School
Area of ground adjoining Pier House Fionnphort, Isle of Mull
Land at Broom Road,
Former Girl Guide Hut, Dunclutha Lane
Luing Primary School
Kilchrenan Primary School
Dunclutha Children's Home
Blairvadach site, Shandon, Helensburgh (Phase 2)
Note: Estimated sale values are not separately disclosed due to
commercial sensitivity.
Page 175

Page 176

Appendix 2 - Project Specific Capital Income and Earmarked Reserves
Project Specific Capital Grants and Contributions
2025-26
£m
2026-27
£m
2027-28
£m
Total
£m
HSCP
Scottish Government Island Funding - Tigh Na Rhuda 0.050 0.000 0.000 0.050
HSCP - Kintyre Care Home 0.650 0.000 0.000 0.650
HSCP - General Funding 0.260 0.000 0.000 0.260
HSCP Total 0.960 0.000 0.000 0.960
CHORD
Rothesay Pavilion - HIE/HES/HLF 2.700 0.000 0.000 2.700
Rothesay Pavilion - Rural Growth Deal 4.000 5.000 0.000 9.000
CHORD Total 6.700 5.000 0.000 11.700
Roads & Infrastructure Services
Coastal Change Adaptation 0.142 0.000 0.000 0.142
Roads & Infrastructure Services Total 0.142 0.000 0.000 0.142
Development & Economic Growth
Coastal Communities Funding (Crown Estate) 0.500 0.000 0.000 0.500
Development & Economic Growth Total 0.500 0.000 0.000 0.500
Total 8.302 5.000 0.000 13.302
Earmarked Reserve Balances
2025-26
£m
2026-27
£m
2027-28
£m
Total
£m
Cimate Change Programme / NDEEF 0.550 0.000 0.000 0.550
RAAC - John Logie Baird 0.600 0.000 0.000 0.600
Red Risk - ICT 0.120 0.000 0.000 0.120
Rothesay Pavilion 3.371 5.000 0.000 8.371
Crown Estates 0.390 0.000 0.000 0.390
SG Islands Fund 0.157 0.000 0.000 0.157
Inflationary Increases - ICT 0.279 0.000 0.000 0.279
Inflationary Increases - Fleet Road Marking Machine 0.028 0.000 0.000 0.028
Inflationary Increases - Claonaig Landslip 0.000 0.030 0.000 0.030
Inflationary Increases - RAAC - John Logie Baird 0.082 0.000 0.000 0.082
Total 5.577 5.030 0.000 10.607
Page 176

Page 177

Appendix 3 - Capital Investment 2025-28
Service Category Project
2025-26                
£000s
2026-27                 
£000s
2027-28                
£000s
Total
£000s
Education Asset Sustainability Block Allocation - Education 0 1,988 1,988 3,976
Digital Inclusion 20-21 0 0 0 0
Free School Meals 434 0 0 434
Preliminary RAAC Investigation 1,006 0 0 1,006
Primary Schools 1,280 0 0 1,280
Secondary Schools 226 0 0 226
Asset Sustainability Total 2,946 1,988 1,988 6,922
Education Total 2,946 1,988 1,988 6,922
Shared Offices Asset Sustainability 5-7 East Clyde Street - Coastal Communities Fund 390 0 0 390
Block Allocation 427 382 382 1,191
Kilmory Castle 1,545 0 0 1,545
Asset Sustainability Total 2,362 382 382 3,126
Strategic Change Clean Energy - NDEEF1 208 0 0 208
Clean Energy - NDEEF2 855 285 0 1,140
Net Zero 256 0 0 256
Strategic Change Total 1,319 285 0 1,604
Shared Offices Total 3,681 667 382 4,730
CHORD Strategic Change CHORD - Oban 79 0 0 79
Rothesay Pavilion 10,000 10,000 0 20,000
Kilmory Business Park Phase 2AA 786 18 0 804
Strategic Change Total 10,865 10,018 0 20,883
CHORD Total 10,865 10,018 0 20,883
ICT Asset Sustainability Block Allocation - ICT 0 820 688 1,508
PC Replacement 669 0 0 669
Server Sustainability 400 0 0 400
Telecomms Network 223 0 0 223
Asset Sustainability Total 1,292 820 688 2,800
Service Development Applications Projects 60 0 0 60
Service Development Total 60 0 0 60
ICT Total 1,352 820 688 2,860
RIS Asset Sustainability Block Allocation -222 3,823 3,823 7,424
Bridge Strengthening 1,498 0 0 1,498
Bute Sea Wall Repairs 359 0 0 359
Claonaig Landslip 42 0 0 42
Coastal Change Adaptation 299 0 0 299
Coastal Protection 500 0 0 500
Environmental Projects 100 0 0 100
EV Quick Chargers 0 0 0 0
Flood Prevention 500 0 156 656
Helensburgh Flood Mitigation 427 0 0 427
Lighting 369 0 0 369
Local Bridge Maintenance Fund 4,777 0 0 4,777
Play Park Renewal 391 0 0 391
Public Convenience Upgrades 109 0 0 109
Roads Reconstruction 2,000 0 0 2,000
Asset Sustainability Total 11,149 3,823 3,979 18,951
Service Development Fleet Management - Prudential Borrowing 500 0 0 500
Weather Incident October 2023 1,100 0 0 1,100
Service Development Total 1,600 0 0 1,600
Strategic Change Campbeltown Flood Scheme 24 387 0 411
Harbour Investment Programme PB 35,406 34,900 30,000 100,306
Street Lighting LED Replacement 321 0 0 321
Strategic Change Total 35,751 35,287 30,000 101,038
RIS Total 48,500 39,110 33,979 121,589
DEG Service Development Helensburgh Public Realm - Arts Strategy Fund 25 0 0 25
Nature Restoration Fund 409 0 0 409
Safe Streets, Walking and Cycling (CWSS) 383 0 0 383
Service Development Total 817 0 0 817
Strategic Change TIF - Halfway House Roundabout 287 0 0 287
Strategic Change Total 287 0 0 287
DEG Total 1,104 0 0 1,104
HSCP Asset Sustainability Block Allocation 0 0 382 382
Capital Property Works 9 0 0 9
Eadar Glinn 25 0 0 25
Kintyre Care Home 673 0 0 673
Struan Lodge Boiler 566 0 0 566
Thomson Home Rothesay 776 0 0 776
Tigh An Rudha HFE 35 0 0 35
Asset Sustainability Total 2,084 0 382 2,466
HSCP Total 2,084 0 382 2,466
Live Argyll Asset Sustainability Aqualibrium 104 0 0 104
Capital Property Works 0 382 382 764
Corran Halls Gaelic Centre 0 86 0 86
Riverside Leisure Centre 305 0 0 305
Rothesay Swimming Pool 65 0 0 65
Asset Sustainability Total 474 468 382 1,324
Live Argyll Total 474 468 382 1,324
Overall Total 71,006 53,071 37,801 161,878
Page 177

Page 178

This page is intentionally left blank

Page 179

ARGYLL AND BUTE COUNCIL COUNCIL
CAPITAL INVESTMENT BOARD 27 FEBRUARY 2025
CORPORATE ASSET MANAGEMENT STRATEGY AND PLAN 
1.  EXECUTIVE SUMMARY  
1.1 Asset management is a structured and systematic approach to managing fixed
assets on an ongoing basis. The Council has a large and varied collection of
assets including buildings, vehicles, transport infrastructure (roads / bridges /
piers), ferries, parks, cemeteries to information technology hardware and
software.  Assets are essential to the operation of the Council and ensuring they
evolve and remain fit for their intended purpose is key to the function of the
organisation and service delivery.  Successful asset management addresses all
phases of an asset's life cycle, from pre-acquisition through to retirement. 
Effective asset management planning means knowing what you own, where it's
located, what it costs you, what it will cost you in the future, whether it will support
current and future service delivery and who is responsible for it.   
1.2  The Council adopts a systematic approach to asset management and this paper
sets out the principles, polices and summary priorities for 2025-26.  The Strategy
and Plan are consistent with the Prudential Code for asset management and the
outcomes of the Best Value 2 review.  This report in conjunction with appendices
and wider Budget Pack forms our Corporate Asset Management Strategy and
Plan.  Asset Management is delivered by all departments and teams of the Council
and overseen by the Capital Investment Board.   
The underlying principles of the Council’s Asset Management Strategy and Plan
are:- 
• The Council’s commitment to sound asset management;
• All Council assets are required for operational, regeneration, economic and
commercial development purposes;
• There are clear links between asset management, the Corporate Plan, the
Argyll and Bute Outcome Improvement Plan (ABOIP), Live Argyll and the
Argyll and Bute Health and Social Care Partnership (HSCP);
• Asset Management is linked to available resources and budgetary
considerations;
• There are sound Governance arrangements for asset management; and
• Asset management requires to be forward looking to deliver the assets the
Council requires for future service delivery. 
Page 179 Agenda Item 3b

Page 180

ARGYLL AND BUTE COUNCIL COUNCIL
CAPITAL INVESTMENT BOARD 27 FEBRUARY 2025
CORPORATE ASSET MANAGEMENT STRATEGY & PLAN  
2. INTRODUCTION 
2.1  The Corporate Asset Management Strategy and Plan establishes the Council’s
overall approach to management of its asset base. In particular it sets out: 
• The Council’s commitment to sound asset management;
• All Council assets are required for operational, regeneration, economic and
commercial development purposes;
• There are clear links between asset management, the Corporate Plan, the
Argyll and Bute Outcome Improvement Plan (ABOIP), Live Argyll and the
Argyll and Bute Health and Social Care Partnership (HSCP);
• Asset Management is linked to available resources and budgetary
considerations;
• There are sound Governance arrangements for asset management; and
• Asset management requires to be forward looking to deliver the assets the
Council requires for future service delivery. 
3. DETAIL 
Core Values of Asset Management 
3.1 Asset management is a structured and systematic approach to managing fixed
assets on an ongoing basis. This approach addresses all phases of an asset's life
cycle, from pre-acquisition through to retirement. Effective asset management
planning means knowing what you own, where it's located, what it costs you, what it
will cost you in the future, whether it will support current and future service delivery
and who is responsible for it.   
3.2 It is recognised that these general guiding principles can also be applied to the
management of non-fixed, or less permanent, assets such as vehicles, plant and
equipment. 
3.3 The Council will ensure that the assets it provides are used in a fair, consistent,
efficient and effective way, taking into account their social and environmental impact
and the needs and aspirations of our people, communities, areas and organisation. 
3.4 Asset management is the process of ensuring that the Council’s Assets are: 
• fit for purpose
• used efficiently
• maintained on a sustainable basis
• matched in investment terms to service needs.  
Page 180

Page 181

Approach and Commitment to Sound Asset Management 
3.5 The Local Government in Scotland Act 2003 provides the legal framework for both
the Prudential Code and the Best Value arrangements.  Under the Prudential Code
local authorities are authorised to make capital investments where it can be
demonstrated that these investments are affordable, prudent and sustainable.  A
local authority, which secures Best Value, is one, which promotes continuous
improvement in the performance of its functions. 
3.6 Asset management is a key element of achieving Best Value. Councils have a
statutory duty to deliver Best Value. This has significant implications for asset
management as Councils must:  
• ensure that management arrangements secure continuous improvement 
• balance quality and cost in relation to the procurement of assets 
• ensure asset management decisions contribute to sustainable development. 
3.7 Asset management has potential to contribute to achievement of efficiency savings. 
3.8 The Best Value 2 Asset Management templates published by Audit Scotland
essentially set out the direction of travel for asset management within the Council.
The desired outcomes of good practice contained within these templates have been
fully adopted and are being actively promoted and progressed by the Strategic Asset
Management Board. 
3.9 In line with Best Value Guidance: “Sound Management of Resources” the Council will
manage its assets to deliver the Council’s corporate and ABOIP objectives, by
providing the basis for corporate challenge and a focus on the future asset
requirements in respect of service delivery.   
Current Governance Arrangements for Asset Management 
3.10 Council governance of asset management by elected members is on the basis of the
Council directing the work of the Council through the Strategic Management Team.   
3.11  Responsibility for Council assets is held by the two Departments:
• Executive Director Douglas Hendry
• Executive Director Kirsty Flanagan 
3.12 These Departments are headed by an executive director reporting to the Chief
Executive and supported by heads of service who are responsible for day to day
service provision and the effective and efficient use of assets. Assets owned by the
Council but operated by the HSCP and Live Argyll continue to be the responsibility of
the Council.   
3.13 The Head of Commercial Services is the Chair of the Capital Investment Board and
is responsible alongside Section 95 Officer for the development of the Corporate
Asset Management Strategy, production of the Corporate Asset Management Plan,
and preparation of the Capital Plan – referred to as the Councils Priority Investment
Plans (PIPS).   
Page 181

Page 182

Council Current Asset Base 
3.14 The table below summarises the main operational and infrastructure assets of the
Council. 
Description Number  Description Number
Shared Accommodation
(Offices)
25  Roads (km) 2,286
Operational Depots 19  Public Road Bridges 903
Primary Schools (in use) 65  Car Parks 118
Secondary Schools 5  Marine Structures 41
2-18 Schools 4  Public Road Coastal
Protection (km estimated)
200
Joint campuses 1  Public Road Retaining Wall
(estimated)
1,000
Youth Centres 1  Public Conveniences 85
Adult Learning Centres 2  Waste Disposal facilities 12
Early Learning Centres 2  Ferries 6
School Houses 19  Airports 3
Special School for pupils
with complex additional
support needs
1  Cemeteries 131     
Homes for the Elderly 7  Children’s Homes 5
Hostel 3  Resource Centres 3
Leisure Centres 5  Crematoria 1
Community Centres 4  Lighting Units 14,642
Halls 5  Vehicles and Plant 634
Libraries 10  IT Systems and Devices
(estimated)
16,955 
Corporate Asset Management Plan and Priority Investment Plans (PIPS) 
3.15 Each year the Corporate Asset Management Plan is prepared on the basis of the
underlying principles of the Corporate Asset Management Strategy referred to above. 
The aim of the Corporate Asset Management Plan is to ensure that capital and
revenue expenditure is directed efficiently and effectively for the coming year.  The
Asset Management Plan is made up of a collective of Priority Investment Plans
(PIPs). 
3.16 In preparing this Asset Management Plan & PIPs services ensure that the
opportunity cost of financial resources tied up in assets is minimised and that there
is: 
• an integrated corporate approach towards asset management, capital
planning and budgeting process for both capital and revenue 
• a process for changing the Council’s asset portfolio consistent with the
Corporate Plan and ABOIP  
• a process for asset decision making which is consistent with services’
requirements 
Page 182

Page 183

• an identification of opportunities for innovation, asset investment or disposal 
• provision of a context for capital project evaluation helping to prioritise
decisions on spending. 
3.17 Each Executive Director is responsible for the completion of their respective PIPs. 
Service asset managers prepare the PIP Summary templates, which, when approved
by the Departmental Executive Director, are submitted to Capital Investment Board
and also discussed as part of scheduled Policy Lead Meetings.   The Capital
Investment Board evaluates each PIP prior to being discussed with respective Policy
Lead (including Asset Management Plans prepared by the HSCP and Live Argyll). 
3.18 
3.19 
3.20 
In preparing PIPs, service asset managers must consider the following guiding
criteria: 
• maximise the impact of all capital and revenue expenditure on assets  
• apply asset performance indicators and benchmarking (Condition,  Suitability
and Risk ) to ensure robust planning and decision making 
• maximise the utilisation of assets 
• reduce the unit costs of service delivery through smarter and more efficient
asset management 
• dispose of underperforming, unsuitable assets and assets which are at risk
and invest in “fit for purpose” assets  
• share assets with Community Partners and Third Sector to maximise public
benefit. 
Asset Management Plan and Priorities for 2025-26 
This Corporate Asset Management Plan for 2025-26 reflects the Council's strategic
objectives contained in the Argyll and Bute Outcome Improvement Plan (ABOIP) and
Corporate Plan to support Strategic Change, Service Development and Asset
Sustainability projects in 2025-26 and beyond. These projects have been developed
taking account of the future service delivery requirements of the Council, the Argyll
and Bute Health and Social Care Partnership (HSCP) and Live Argyll. 
On an ongoing basis all services assess the risk arising from the condition and
suitability of the assets they have responsibility for. This enables the prioritisation of
projects for inclusion within the capital plan.  The continued reduction in available
capital budgets and revenue maintenance budgets has had an impact on planned
maintenance programmes. This in turn increases the rate of deterioration in asset
condition across the Council leading to increasing demand for capital investment in
the asset base to maintain service delivery.  
3.21 
3.22
The Priority Investment Plans (PIPs) that outline the proposed resource allocation,
condition and prioritisation of capital expenditure are outlined at Appendix 1.   
It is clear from the PIPs that the real terms reduction of available capital resources
year to year plus recent unprecedented increases in inflation and global events is
resulting on the majority of investment towards Asset Sustainability – i.e. ensuring
our current assets remain fit for purpose.  There is minimal service development,
transformation or strategic change mainly due the higher value of such projects.   
High Risk Assets Not Addressed within Capital Plan Proposals for 2025-26
Page 183

Page 184

3.23 The Capital Programme for 2025-26 has been structured to address the majority of
foreseen Council’s high risk assets.  High risk unfunded assets requiring attention in
2025/26 totalling £376k are note below. 
• ICT Network Equipment - £71k
• Riverside Leisure Centre, Dunoon – Structural Repair Works - £305k. 
Opportunities for Improvement 
3.24 It is recognised that there are opportunities to take a more strategic approach to
capital planning and to enhance existing governance arrangements around capital
investment activity.  The Executive Leadership Team is committed to undertaking a
future review and recommendations will be reported to members during 2025-26 in
this respect.  Whilst the detailed specification of requirements of the review has still
to be developed, at this stage, it is anticipated that the review will include the
following: 
• Enhanced governance arrangements, including greater member involvement in
the allocation of capital resources.  This would include a review of current Priority
Investment Plans and whether they remain fit for purpose in their current format
and provide Members with sufficient information for decision making; 
• Longer term financial planning, including longer term Capital Plan (5-10 years); 
• Integrated capital forecasting, treasury strategy and debt charges (revenue
budget) modelling; 
• A review of the capacity within the current debt charges budget for additional
investment, reflecting capital planning and treasury borrowing assumptions; and 
• An updated Capital Strategy, to help ensure that we are investing in our
infrastructure, to support council key strategic priorities. 
4. CONCLUSION 
4.1 The aim of this Corporate Asset Management Strategy & Plan including summarised
Priority Investment Plans (PIPs) is to ensure that asset management takes place in a
systematic and well governed manner taking cognisance of corporate policies, plans,
systems and processes.   
5. IMPLICATIONS 
5.1 Policy – The report sets out the Council’s policy and
prioritisation in respect of Asset Management. 
5.2 Financial -  This strategy and plan follows Prudential Code and
outlines the planned capital investment and funding
for the capital planning period 2025-28.. 
Page 184

Page 185

5.3 Legal -  Statutory and Regulatory requirements in relation to
Health and Safety have been provided for within
capital spending plans.   
5.4 HR -  There are risks that the funding available will have an
impact on the sustainability of the Property Design
Team and the design team within Roads and Amenity
Services. 
5.5
5.5.1
5.5.2
5.5.3
Fairer Scotland Duty -
Equalities - 
Socio-Economic Duty -
Islands Duty - 
Will be considered as appropriate.
Will be considered as appropriate. 
Islands duty is considered as part of the Equality and
Socio-Economic Impact Assessments
5.6 Climate Change As outlined in the Policy, Plan and PIPs there is
specific funding being allocate to investment relating
to dealing with the impacts of climate change and
reducing the Council’s carbon footprint.   
5.7 Risk -  None. 
5.8 Customer Service -  Investing in assets will continue to ensure access and
sustainability of services.   
5.9 The Rights of the Child
(UNCRC)
None. 
Kirsty Flanagan, Section 95 Officer
Douglas Hendry, Executive Director with responsibility for Commercial
Services
Ross McLaughlin, Head of Commercial Services
13 February 2024 
Policy Lead for Financial Services and Commercial Services:  Councillor
Ross Moreland 
APPENDICES:-
Appendix 1 – Service Priority Investment Plans (PIPS) 
Page 185

Page 186

PRIORITY IMPROVEMENT PLAN – ASSET GROUP SUMMARY 
Asset Group Education  3rd Tier Manager Susan Tyre / Wendy Brownlie
Description of
Asset Group
and Condition
Assessment 
ABC Learning Estates Strategy – Learning Environments in all schools should have a suitability grading A or B
A=good; B=satisfactory; C=poor; D=bad 
Asset Group No
and
/or
val
ue.
Condition Suitability
A B C D A B C D
Primary Schools (in use) 65 4 61 0 0 38 27 0 0
2-18 schools 4 1 3 0 0 1 2 1 0
Joint Campus 1 1  0 0 1  0 0
Secondary Schools 5 4 1 0 0 4 1 0 0
Complex addition needs schools 1  1 0 0 1  0 0
Adult learning centres, and a Youth
Centre
2  1 1 0  1 1 0
Early Learning and Childcare Centres 2  2 0 0  2 0 0
School Houses 19   0 0   0 0
Investment
(current and
planned)    Funding source Current Year Anticipated Investment (£m)  
2024-25 (£m) 2025-26 2026-27 2027-28
Block Allocation
Scottish
Government 2.226 2.219 1.988 1.988
Block Allocation
Carried Forward
Scottish
Government 2.160 (0.279)  
New Schools
Scottish
Government 0.710   
1140 Hours
Scottish
Government 0.243   
Gaelic Grant
Scottish
Government 0.038   
CO2 Grant  0.113   
RAAC - Capital
Allocation
Council
Reserves 3.200     
8.690 2.946 1.988 1.988 
2024-25 Overview 
Investment Strategy
 The Investment Asset strategy for Education in 2023-24 was to focus on undertaking major maintenance and
keeping assets that we have wind, watertight & safe ensuring schools remain in a minimum B category and avoid
slippage into C 
 In 2023-24 work was done to maintain or improve the suitability of several schools including scoring of;
Dalintober Primary, Castlehill Primary, Garelochhead Primary, Kilninver Primary, Islay High,  Iona Primary,
Kilchattan Primary, Port Charlotte Primary, Bowmore Primary, Dalmally Primary, Kilmodan Primary, Sandbank
Primary, St Muns Primary, St Andrews, North Bute, Tiree High School
 Works to create a high quality learning environment internal and external at our early learning and childcare
settings: Clyde Cottage Nursery, Park Primary, Dunbeg, Easdale and Kilchattan
 Works to create new Learning Centres in Campbeltown (Castlehill Primary) and Islay High along with design work
for new Learning Centres Tobermory and Hermitage Academy 
Risks
Asset sustainability
Page 186

Page 187

 Significant backlog of maintenance work includes roof repairs, rewiring, damp repairs, heating upgrades and
suitability works. Failure to invest in planned capital maintenance in a timeous manner will see a reduction in the
condition scores and could result in component failure and building closure. 
 Council agreeing to progress with LEIP funding following Business Case.
 Diminishing level of investment coupled with increased costs (inflation and construction costs) mean many
buildings and building elements are deteriorating at a rate which may not be able to be addressed via revenue
(maintenance / reactive) expenditure.   This is beginning to impact on the use of buildings, capacity of the school,
flexibility to deliver the curriculum, health & safety standards, support for pupils with complex needs and our
inspection ratings.  This will continue unless the number of properties are reduced or the capital and revenue
budget is increased.
Service Development
 Updated Business Case being prepared for LEIP funding for Tobermory will result in significant investment to
address condition and suitability (service development project)
 Discovery of RAAC within John Logie Baird Primary resulted in significant investment identified for repairs to
replace (service development project)
 Scottish Government roll out of Universal Free School Meals (UFSM). The UFSM has identified works to be
carried out in identified schools to support the roll out of free school meals to all primary pupils within Scotland.
Unknown if this will be back on the agenda for Scottish Government during 24-25. 
Summary of Planned 2025-26 investment
Investment Strategy at funding levels indicated above
 At current funding levels within the block allocation the focus will remain on high and medium risk Asset
Sustainability priority projects – therefore no funding is allocated to ‘service development’ projects
 John Logie Baird works ongoing to remove RAAC and reinstate learning spaces
 Continued development of Business Case as part of LEIP to bring new Campus to Mull
 The aim is to improve condition scorings at the following schools: Tobermory 3-18
 suitability scores in the following schools: Lochgoilhead Primary, Keills Primary, Tarbert 2-18
 As per decision of Community Services Committee in August 2023, Capital works relating to new Additional
Support Needs provision by way of new learning centres in, Mull and Hermitage Academy.
 £2.219M reserved for Asset Sustainability will be used to undertake major maintenance and keeping assets that
we have wind, watertight & safe ensuring schools remain in a minimum B category and avoid slippage into C 
Unfunded Investment Priorities 
None identified that would cause Health and Safety risk 
Match funding Opportunities/External Funding 
Achieved 2024-25 Opportunities 2025-26
Asset Sustainability Gaelic – See below nil
Service Development  Climate Change - See below Climate Change - See below
Strategic Change Bid for Learning Estate Investment
Programme (LEIP) Funding
Climate Change - See below
Major opportunity to access Government flagship investment programme Learning Estate Investment Programme
(LEIP) for new campus on Mull.  
In relation to climate change, opportunities for external funding will continue to be explored to allow delivery of
projects similar to the Non-Domestic Energy Efficiency Framework (NDEEF). These opportunities could offer low
carbon solutions throughout the wider Argyll and Bute area, which would not only assist the Council in its journey to
Net Zero Carbon (NZC) but would also result in financial benefit through revenue savings or additional income. The
delivery of these types of project which fall into a spend-to-save category will also consider Prudential Borrowing as a
funding source i.e. where simple payback breaks even in relatively short timeframes.
Page 187

Page 188

Links to relevant strategies
Corporate Asset Management Strategy
Learning Estates Strategy 
ASN provision across Argyll and Bute
CO6: We have an infrastructure that supports sustainable growth 
Page 188

Page 189

PRIORITY IMPROVEMENT PLAN – ASSET GROUP SUMMARY 
Asset Group Council Owned
Buildings 
Group Lead / 3rd
Tier Manager
Ross McLaughlin & Craig Houston 
Description of
Asset Group
and Condition
Assessment 
This is a new Asset Grouping for 2025/26 as specified in the newly adopted Capital Investment
Strategy.  The majority of Council owned buildings are part of this grouping that includes Offices,
Health and Social Care Buildings, hostels, LIVE Argyll Properties and Depot Buildings.  It excludes
Education Buildings (schools) and operational specific buildings like public toilets, airport buildings
and crematoria.   
Building condition and suitability is measured in accordance with the Local Government
Benchmarking Framework (LGBF). The condition rating of buildings is measured through an
assessment of the main elements of the building (roof, walls, windows, doors, services etc.) via a
weighted scoring matrix. Suitability is measured in a similar manner but instead of building
elements, assesses themes including: location; accessibility; building facilities; the working
environment; and ICT infrastructure etc. These assessment methodologies have recently changed
and in moving forward will require more input/assessment for each property. 
All information is recorded within the Council’s property management system, Concerto, and
LGBF returns are made on an annual basis
SHARED OFFICES 
Group No. Condition  Suitability 
A B C D A B C D
Owned 24 2 22 0 0 9 11 4 0
Leased 1 0 1 0 0 0 0 0 0 
LIVE ARGYLL
Group No. Condition  Suitability 
A B C D A B C D
Community Centres 4 0 2 2 0 0 3 1 0
Leisure Centres 4 1 3 0 0 0 3 1 0
Halls 5 1 4 0 0 1 3 1 0
Libraries 11 4 7 0 0 2 7 2 0
Museums 1 0 0 0 0 0 1 0 0
Archives 1 0 1 0 0 0 1 0 0
Sandbank HQ 1 0 1 0 0 0 1 0 0
Sport Centre 1 1 0 0 0 0 1 0 0
Campbeltown
Pavilion
1 1 0 0 0 0 1 0 0 
HOSTELS
Group No. Condition  Suitability 
A B C D A B C D
Hostels 2 0 2 0 0 0 2 0 0 
HSCP BUILDINGS
Group No. Condition  Suitability 
A B C D A B C D
Elderly Persons Homes 7  5 2   5 2 
Children’s Homes 5 3 2   3 2  
Resource Centres 3  3   1 1 1 
Offices 8 3 5   1 6 1 
Other 6  6   2 3 1 
Page 189

Page 190

DEPOTS 
Asset Type No. Condition Suitability  
A B C D A B C D
Depots/Workshops 22 1 12 6 3 1 12 8 1 
A=good; B=satisfactory; C=poor; D=bad
Investment
(current and
planned) 
Funding  Funding source 
Current Year Anticipated Investment (£m)
2024-25 (£m) 2025-26 2026-27 2027-28
Block allocation
Scottish
Government 1.374 1.281 1.146 1.146
Block allocation
Carried Forward
Scottish
Government 3.049 2.267 (0.011) 0.000
Non Domestic
Energy
Efficiency
Framework
(NDEEF)
Scottish
Government
0.124 1.063 0.00 0.00
Islands
Programme
Scottish
Government 0.400 0.050  
Partner
contribution 
HSCP
0.881   
Strategic
Housing Fund
Council
0.080   
Totals  5.908 5.934 1.135 1.146 
2024-25 Overview 
Investment Strategy 
This is a new asset category however there has been notable projects delivered or planned during 2024-25 by LIVE
Argyll, Shared Offices, Health and Social Care Partnership and Depots.  
LIVE Argyll have completed renovation works at Lochgilphead CEC, upgrades to Health Suite at Aqualibrium.  Moat
Centre, Rothesay re-wired.  New reception and windows at Rothesay Leisure Centre.  During upgrade works to
Riverside Leisure Centre Dunoon significant structural corrosion was identified.  All works have paused and strategic
approach to address the structural issues are now required.  
Shared Officers – continued rationalisation of assets, mothballing of Whitegates, leasing out of Helensburgh and
Lomond Civic Centre.  Planning for redesign of Kilmory and rewire.  
Depot Buildings – Demolition of dangerous building and erection of temporary building at Bishopton Road
Lochgilphead.  
Health and Social Care Partnership – Tigh A Rudha, Tiree upgrade remains ongoing.  The recently acquired Kintyre
Care Home has also required several capital investments to upgrade fabric and energy efficiency.  
Hostels – Window investment at Oban Hostel and roofing repairs at Dunoon.  
Summary of Planned 2025-26 investment
Investment Strategy at funding levels indicated above
Principles are:-
1. Asset Sustainability
Building assets require to be safe and health and safety compliant to remain operational.  Due to the size of Council
portfolio and increasing cost of construction and maintenance substantial investment is required to simply maintain
our current building stock.   Property condition and suitability assessments are reviewed on a 5 year cycle to prioritise
investment. Work is required to maintain the facilities in a wind and water tight condition and to ensure compliance
to legislative and regulatory requirements. Work will include, roof refurbishment, boiler replacement, re-wire of
Page 190

Page 191

ageing buildings, remedial work to emergency lighting and fire prevention systems and this will include other building
plant equipment. Notable Asset Sustainability projects that are planned are Struan Lodge (Dunoon) re-wire (currently
out to tender and subject to review) and similar full re-wire required of Kilmory which will form part of wider
redesign project.  Works to investigate structural issues at Riverside, Dunoon and solutions will be a significant
project that requires strategic overview.  
It is also notable that Care Inspectorate inspect Hostels and Care Homes and substandard buildings may be subject to
enforcement and potential closure.  
2. Business Development
The asset group managed by differing departments is ageing and requires more capital investment to ensure it
remains in an operable state. Year-on-year the Capital Investment is becoming less which in turns places greater
strain on an already insufficient central repairs budgets. Underinvestment of Capital funds will lead to facilities that
will further deteriorate in condition and suitability and inevitably reach a stage where they are deemed not fit for
purpose. Failure to maintain assets and ensure they are fit for purpose will adversely impact on Council and partners
ability to deliver agreed service specification requirements and fulfil charitable objectives. Business Development
activity may assist teams or partners delivering services in another way that may reduce or eliminate need for
buildings – can be a precursor to Principle 3 (Disinvestment) Notable Business Development projects being
progressed in 2025/26 include review of Corran Halls business model, Care Home Programme and Library Services in
partnership with HSCP and Live Argyll.  Thomson Court Care Home on Rothesay expanded bed spaces to meet
increased demand.  
Although Capital funding is very limited, it is important for liveArgyll to be aspirational in its business planning and
strategic thinking. Being responsive to changing customer needs and usage trends, liveArgyll would propose business
case development of Corran Halls, Ramsay Hall, Sandbank Building and several Libraries.
Investment in depots to create inspection or 3rd Party MOT Stations is also considered to be a business development
opportunity particularly in Campbeltown, Helensburgh and Lochgilphead.  
Construction has commenced on new Business Parks at Kilmory and Oban Airport.  Business development could
include the construction of business / industrial units for commercial lease to create income that can be reinvested
into other priorities.  
3. Disinvestment, Disposal or Repurpose Buildings not fully utilised
Success has been demonstrated with maximising efficiency of our building stock via Our Modern Workspace
Programme where 10no office buildings have been mothballed or repurposed.  More emphasis will be placed on this
in coming year with focus on Kilmory HQ and Live Argyll + HSCP Properties.  Notably in Lochgilphead and Oban.  The
depot rationalisation board will also continue.  
Reducing the number of buildings reduces operational costs such as utilities, non domestic rates, maintenance and
cleaning.   
UNFUNDED PRIORITIES 
Service Priority Cost (£) Are costs
indicative
or
calculated)
Estimated
funding
shortfall
Asset category (asset sustainability,
service development, strategic
change)
Riverside Leisure Centre
(Dunoon)  – temporary
structural works 
£305,000  Calculated £305,000 Asset Sustainability  (ESSENTIAL)
Riverside Leisure Centre
(Dunoon)  – RIBA Stage 0
- Business Case
Development for new
Leisure Centre 
£200,000  Indicative  £200,000  Strategic Change 
Match funding Opportunities/External Funding 
Achieved 2024-25 Opportunities 2025-26
Page 191

Page 192

Islands Programme
Funding  Part funding Tigh A Rudha, Tiree Islands Programme Funding – Thomson
Court Care Home Rothesay
Scottish Government
Funding – Bairns Hoose
Grant award Development of Bairns Hoose project for
HSCP
Place Based investment
Funding
Our Modern Workspace funding for
office rationalisation in Rothesay 
Strategic Housing Fund For Housing related enabling works or
delivery 
Links to relevant strategies
Capital Investment Strategy
Local Development Plan 2
Council Corporate Plan
De-carbonisation Plan 
Page 192

Page 193

PRIORITY INVESTMENT PLAN – ASSET GROUP SUMMARY 
Asset Group ICT 3rd Tier Manager Gerry Wilson
Description of
Asset Group
and Condition
Assessment 
Asset Group No
and/or
value.
Condition Suitability
A B C D A B C D
Server Infrastructure
Overall 1,941k 859k 890k 24k 469k 859k 890k 24k 469k
PC, Laptops and
Tablet Devices -
Corporate
£906k 276k 213k 226k 190k 276k 213k 226k 190k
PC, Laptops and
Tablet Devices -
Education
2,496k 987k 516k 478k 514k 987k 516k 478k 514k
Communications
Equipment incl
network devices and
Broadband
2,492k 811k 962k 496k 223k 811k 962k 496k 223k
Supported Business
Software
Applications(Number)
75 54 12 9 0 50 14 11 0 
Investment
(current and
planned) 
Funding  Funding
source 
Current
Year Anticipated Investment (£m)
2024-25
(£m) 2025-26 2026-27 2027-28
Block Allocation Scottish
Gov  0.771 0.768 0.688 0.688 
Block Allocation
Carry forward
Scottish
Gov 0.043 0.060 0.132 0.000  
Additional Council
Funding
Council
Reserves 0.605 0.453 0.000 0.000 
Total    1.419 1.281 0.820 0.688 
2025-26 Overview 
Investment Strategy 
Asset Sustainability – All of the Council’s ICT assets are replaced on a rolling cycle. PCs and Laptops are
replaced on a 4 year (corporate) or 5 year (education) cycle. Major infrastructure assets such as servers,
firewalls, and network routers and switches are replaced every 6 years. This is an industry standard
approach to the maintenance of critical infrastructure designed to minimise the risk of service failure which
would otherwise result in poor system reliability, the unavailability of major systems, and a consequential
failure to deliver front line services.  The expected lifespan of ICT infrastructure assets is determined by
manufacturer support availability, age, or fitness for purpose. 
The ICT Service normally apportions part of the ICT Block Allocation each year to cover the annual PC
Replacement and network infrastructure asset costs. Every six years we also have to prioritise our spend on
our two data centres (the heart of the ICT environment) which normally means we have to allocate the
majority or all of the block allocation for that year to servers and network equipment. The data centres
continue to host several hundred council applications as the true cost of migrating to the cloud remains
Page 193

Page 194

unaffordable for many systems. The data centre upgrades started this year and will continue through
2025/26.
We face enormous inflationary pressures on the ICT Capital Programme as the post pandemic global supply
crisis impacts on technology equipment pricing. The current need to prioritise investment in critical server
and network assets for the data centres means there would have been little or no funding available for PC
replacement or other service development projects without the additional capital agreed at the last budget
meeting or without drawdowns from the Capital Contract Increases Earmarking fund to cover some of the
inflationary and exceptional cost increases. Our strategy is therefore based on the proposed drawdowns
from those two funding sources being allocated to the affected asset replacement projects before the block
allocation is then distributed across the remaining sustainability projects – IT Network and Server
infrastructure and PC Replacement.
Service Development and Strategic Change - The ICT Development framework establishes a consistent and
transparent method for the evaluation of ICT business case based proposals being presented to the Capital
Investment Board.  The framework allows competing demands for Council resources to be compared like for
like with the purpose of establishing an ICT Development Plan that includes a mix of small and significant ICT
developments that are both affordable and deliverable.  The ICT Development Plan determines the ICT
Asset service development priorities and the levels of funding required to meet them. No new business
cases have been approved at the Capital Investment Board for new business application systems or
replacement of existing business application systems
Risks
1. All ICT Assets - Failure of key infrastructure supporting technology components that are critical for day to
day service delivery across all services of the Council. The severity and the reach of the impact will very
much depend on which components fail and consequences for individual services but could also be cross
Council affecting.  As technology components age and move out of support, the Council risks non-
compliance with PSN, Cybersecurity and PCI DSS obligations.
2. PCs and laptops are currently replaced on a 4 year Corporate and 5 year Education cycle with no
warranty or maintenance on PCs after the first 3 years. This has consequences for the reliability of
desktop equipment. On warranty expiry, the Council is required to effectively self-insure against failure. 
3. Service Development - In addition to impacting our ability to comply with our security obligations, the
risk of underinvestment for key business application systems will result in missed opportunities for
greater efficiencies and service improvements across council services. 
Summary of Planned 2025-26 investment
Investment Strategy at funding levels indicated above
Please Note – anything identified as RED RISK is unfunded.
Server Sustainability 
Replacement of Server equipment in Kilmory and GWITC so that our infrastructure is robust, supported and
fit for purpose for at least 6 years.  Major investment on the data centre servers is underway to ensure that
the servers will require minimum investment over the following 5 years. The funding requirement for
servers and associated software has been met from a combination of the block allocation and drawdown
from the Capital Contract Increases Earmarking fund and will continue through 2025/26. NO RED RISK FOR
2025/26 
PC Replacement 
 Replacement of Corporate PCs due to become red risk assets (> 4 years old) in 2025/26, with 3 years
of warranty.
 Replacement of Education PCs that either are already red risk assets or due to become red risk
assets (> 5 years old) in 2025/26, with 3 years of warranty.
Page 194

Page 195

Note – the PC replacement programme is based on a continuous cycle of investment. One quarter of all
corporate PCs were expected to be replaced each year alongside one fifth of Education PCs each year.
Exceptional price rises in secondary school device equipment this year means that the original budget of
669k is insufficient to cover the replacement of devices at a cost of £704k in 2025/26. The additional funding
requirement of 35k has been met from existing block allocation. NO RED RISK FOR 2025/26
IT Network
Replacement of IT Network Infrastructure technologies which are either due to become or are already end
of life assets in 2024/25. This investment will result in these assets being fit for purpose for potentially 6
years.  This includes replacing end of life network switches at our Kilmory and GWITC datacentres, as well as
replacement of network routers and switches across a number of our schools and offices.  More network
equipment will need to be replaced in 2026/27 and we are expecting a large amount of RED RISK assets
(approx. £405k) in 2026/27. For 2025/26 we have an immediate shortfall as follows:
Due to greater increases in pricing of equipment than anticipated and short notice of equipment
reaching end of life, the existing funding (£152k) is insufficient to meet the replacement of
equipment at a cost of £223k in 2025/26. This results in a RED RISK emerging for Network
equipment in 2025/26 of 71k. 
Key Business Applications
No business application red risks have been identified definitively beyond 2024/25 at this time. 
Unfunded Capital Pressures  
The ICT Management team follows an industry best practice approach for the replacement of key
technology assets based around the age and condition of each asset type. This is required as part of our
statutory membership of the PSN where we are obligated by the Cabinet Office to maintain our network of
servers and devices at current supported levels. The PSN in turn allows us access to their private network to
collaborate and share data with other public sector partners such as the National Registrars for Scotland,
HMRC, and DWP in a safe, secure, and trusted manner. Our investment priorities are therefore based on
sustaining our complex network of circuits, routers, servers, pcs, and applications and this is reflected in our
three priorities for 2025/26. Funding from the block allocation, coupled with contributions from previously
agreed Capital Contract Increases Earmarking fund will allow us to only partially replace red risk critical IT
server and infrastructure assets for 2025/26. 
This is illustrated in the following table for 2025/26: 
Service Priority Expected
Cost in
2025/26
Budget
available
Are costs
indicative or
calculated)
Estimated
funding
shortfall
Asset category 
(asset sustainability, 
service development, 
strategic change)
1.  IT Networks 223k 152k calculated 71k Asset Sustainability (ESSENTIAL)
TOTAL ADDITIONAL
FUNDING REQUIRED   
£71k 
Match funding Opportunities/External Funding 
Achieved 2023-24 Opportunities 2024-25
Page 195

Page 196

Asset Sustainability 
Service Development   
Strategic Change   
Links to relevant strategies
ICT and Digital Strategy 2021 -24 
Page 196

Page 197

PRIORITY INVESTMENT PLAN – ASSET GROUP 2 SUMMARY 
Asset Group Road and Footways 3rd tier
Managers
Hugh O’Neill and Tom Murphy 
Description of
Asset Group
and Condition
Assessment 
Asset Group
Road and Footway
Condition
No and
or/Value*
CONDITION
(Percentages based on total asset value)
Green Yellow Amber Red
Roads
*See below comments £2.09Billion 50.24% 9.36% 26.64% 13.76%
Footways  £78.3Million * * * * 
This can be further broken down to road classification as per below table: 
* There is no similarly automated footway condition survey mechanism. 
A Safety Inspection programme, with a frequency of annual to monthly visits, based on
the hierarchy of the footway, is carried out by the inspection team. Generally, footways
are considered safe and fit for purpose with maintenance works undertaken in response
to identified defects or public complaints as investment and resources permit. 
The externally delivered Road Condition Survey was not fully carried out in 2023 and
missed most of our island roads, we have therefore had to use the previous year’s RCI for
the purpose of this document Capital Programme, as such the above table also refers to
last years RCI results. 
Page 197

Page 198

Parking: 
Argyll and Bute have 118 off street car parks ranging from formally laid out urban car
parks to less formal more rural car parks. 
There is no fixed scoring mechanism for our car parks, although safety inspections are
carried out to a standard similar to those carried out on the road network. 
Asset Group No. Condition                                    Suitability
Car parks 118 A          B       C      D       A            B          C          D  
42       53      22      1      N/A    N/A     N/A    N/A 
Argyll and Bute Council has 29 Pay and display car parks. 
There is no capital funding for car parks – the car park maintenance budget money is
funded from income raised from fees and charges. 
Investment
(current and
planned)  Funding Roads 
Funding
source 
Current Year Anticipated Investment (£m)
2024-25 (£m) 2025-26 2026-27 2027-28
Block
Allocation
Scottish
Government
3.412 2.000 3.823
RIS Total
3.823 
RIS Total
Block
Allocation
Carried
Forward
Scottish
Government
0.610 (0.222) 0.00 0.00
Additional
Roads
Reconstruction
Council 4.588 0.000 0.000 0.000
Page 198

Page 199

Weather
Incident 2023
Council 3.208 1.100 0.000 0.000
Claonig
Landslip
Council 1.570 0.030 0.000 0.000
CHORD
Funding
Council 0.060 0.000 0.000 0.000  
13.448 2.908 3.823 3.823 
Funding (Car
Park) Funding source Current Year Anticipated Investment (£m)
2024-25 (£m) 2025-26 2026-27 2027-28
TOTAL  0.000 0.000 0.000 0.000 
2024-25 Overview 
Investment Strategy
Prioritisation of Asset Sustainability:
Road condition is measured by the Scottish Road Maintenance Condition Survey (SRMCS) which assesses
parameters such as surface texture and cracking, smoothness and rutting. This provides an indication of
the residual life of the road structure. 
It should be noted that the flooding and road closures experienced in October 2023 due to excess rain are
likely to continue due to climate change. It is therefore imperative that appropriate road maintenance
including drainage and ditch clearance is carried out to alleviate flood and land slip risks on our Council
roads. More consideration needs to be given to climate change adaptation regarding roads and transport
infrastructure. 
CAPITAL RESURFACING INVESTMENT OPTIONS 
Argyll and Bute Council take part in the Scottish Roads Maintenance Condition Survey (SRMCS) contract
which generates the road asset condition data presented in this report. Further detail on this methodology
can be found in the Annual Status and Options Report produced each year. This methodology provides the
Council with road condition deterioration modelling based on our proposed investment levels. For the
2025/26 financial year investment levels of £2m, £3M and £11M have been used for modelling purposes
to determine the effects of these levels of investment on the condition of the road carriageway. 
The Scottish Statutory Performance Indicator (SPI) for road condition is the percentage of a road network
that has an RCI of 40 or more (ie is in the ‘Red’ or ‘Amber’ categories). 
The below lists 3 options where direct comparison can be made with investment against a 20 year profile
for road condition. Further budget modelling for £5M and £8M are available in the ASOR. 
OPTION 1— £2M 
An annual investment of £2m would lead to very substantial deterioration on overall RCI, this would
significantly increase risk to road users safety and may well leave the council open to criticism.  The
volume of reactive temporary repairs would steadily rise, year on year as would public liability claims.
Customer satisfaction levels can be expected to decrease dramatically. 
Page 199

Page 200

OPTION 2— £3M    
An annual investment of £3m would lead to a substantial deterioration on overall RCI, this would
significantly increase risk to road users safety.  The volume of reactive temporary repairs would steadily
rise, year on year as would public liability claims. Customer satisfaction levels can be expected to steadily
decrease. 
OPTION 3— £11M  
An annual investment of £11m (based on 2024/25 costs) would largely maintain the current condition of
the road carriageway network. 
Prioritisation of Strategic Change:
The value of undertaking adequate preventative maintenance works cannot be overstated. It is the most
vital and fundamental function required to extend infrastructure service life, strengthen network
resilience, and minimise demand for capital investment. 
Over the last 10 years, where we have seen average investment of at least £8 Million on Roads
Reconstruction, RIS have been able to improve our road condition which in turn improves visitor
numbers/local businesses as well as supporting our communities daily commute. However we have seen
recently rises in the costs of materials and vehicles etc which has now increased investment from £8M to
£11M to keep over 50% of our roads in the good condition category. The initial improvement to over 50%
was purely down to investment and the support provided by members allowing RIS officers to manage the
network effectively. 
Footways
Footways investment of £1m over previous 3 years has tackled some of the worst identified sections of the
network aimed at reducing reactive maintenance demands. There is no planned capital footway
investment for 2025/26.
Our footways have a depreciation cost of approximately £1M per annum, as calculated by SCOTS,
therefore a steady annual investment required to prevent the footways from deteriorating and maintained
safe and proportionate for use. 
Risks
1. Increase in third party insurance claims. This would be due to an increase in potholes and road defects
as funding was not sufficient to treat roads properly.
2. Restricted traffic and the possibility of some roads having to be closed on safety grounds. Failure to fully
deliver the duty to maintain, through limited funding as a Roads Authority and a lack of funding will
require prioritisation of routes which may well restrict vehicular sizes on certain roads to prevent further
decline/damage. This would include consideration of weight, width and length limits on our roads as well
as restricted speed limits and ultimately road closures if roads were to become unsafe due to damage. The
practicality to deliver on road closures or restrictions also imposes a cost on the council funds to provide
traffic management and Temporary Traffic Regulation Orders.
3. Detriment to business and tourism should the road network deteriorate to a point that its condition is
not convenient for the travelling public.
4. Increased risk of flooding and land slips should drainage and ditch clearance works not be carried out
regularly. This was highlighted in the flooding from October last year where land slides closed off several
of our roads with a cost in excess of £10m for the clear up of the roads and surrounding area. 
Page 200

Page 201

Summary of Planned 2025-26 investment
Investment Strategy at funding levels indicated above
Asset Sustainability:
Carry out a mix of surface dressing, edge strengthening, resurfacing works.  The surfacing works will
include proportionate drainage works.  Works will be identified from condition surveys, collision data, and
known development activity and reports from the public.  Final programmes may be adjusted to take
account of any winter deterioration. 
Strategic Change:
An annual investment of approximately £11M would maintain the overall RCI provided there was no real
change to inflation, however as inflation and costs increase the steady state budget must also be
increased. Without this inflationary adjustment, the volume of reactive temporary repairs would steadily
rise, year on year as would public liability claims. Customer satisfaction levels can be expected to steadily
decrease.  
Unfunded Capital Pressures: 
Service Priority Cost (£) Are costs
indicative or
calculated)
Estimated
funding
shortfall
Asset category (asset
sustainability, service
development, strategic change)
1. Road Maintenance £11M to
retain
steady
state
Calculated as
per agreed
methods
£9M (if £2M is
allocated to
Roads Capital
from the Block
Allocation)
Asset Sustainability
2. Footway
Maintenance 
£950k to
retain
steady
state
Estimation of
condition
calculated as
three percent
of gross
replacement
cost of the
asset.   
£950k  Asset Sustainability 
Match funding Opportunities/External Funding 
Achieved 2024-25 Opportunities 2025-26
Asset Sustainability   Active Travel Funding 
 Road Safety Improvement Fund
£144,653.
 STTS
 Crown Estates Funding
 RTIF (not available for
2024/25, therefore may not be
available for 2025/26)
 Road Safety Improvement
Fund
Page 201

Page 202

Service Development    Community Regeneration
Fund
 Islands Infrastructure Fund
Strategic Change   
Links to relevant strategies
Item No 7 ASOR EDI Report
The road infrastructure is also covered by the Roads Asset Management Plan (RAMP) which has been
carried out as part of a national project steered by SCOTS. This means that the roads asset infrastructure’s
condition can be compared not only across Argyll and Bute, but across the whole of Scotland. 
Page 202

Page 203

PRIORITY INVESTMENT PLAN
Asset Group Street lighting 3rd Tier Manager Tom Murphy
Description of
Asset Group
and Condition
Assessment 
Gross street lighting stock replacement cost (new replacement) from the current Asset
Register is £47m. 
We have 13,616 Street Lighting Columns. It is estimated that 35-45% of these columns
have exceeded their expected service life of 25-30 years, with some in the region of 70
years. 
Significant benefits in terms of energy efficiency and public amenity have been delivered
over recent years through the programme of replacing old luminaires with efficiency LED
units and associated targeted dimming of lights. Carbon emissions have greatly reduced
as a result of the project. 
Service Standards: To ensure that our asset is maintained properly, electrical certification
/ testing is required every 6 years with column condition and ranking carried out every 4
years as part of scheduled planned maintenance. The next round of testing (Categorised
as planned maintenance) is due 2025/26. Inspections undertaken of columns as part oif
the LED programme has provided a prioritisation of columns due for replacement with
the residual funding from the LED project together with other capital allocations that
have been received. 
Investment
(current and
planned) -
Updated by
Finance for
2025-26 
Funding  Funding source 
Current Year Anticipated Investment (£m)
2024-25 (£m) 2025-26 2026-27 2027-28
Block
Allocation
Scottish
Government
0.150  0.000  
Block
Allocation
Carried
Forward
Scottish
Government
0.175 0.369  
LED Project -
Prudential
Borrowing
Council 0.300 0.321    
0.625 0.690 0.000 0.000 
2024-25 Overview
Investment Strategy
The LED Upgrade Project funded by Prudential Borrowing is nearing completion in terms of luminaire
upgrades, we are still looking to finalise this within financial year 2025/26
To date 290 columns have been identified in the poorest condition category and will be replaced through
the LED Upgrade Project. 
In addition, with the extra capital funding received during 2023/24, a number of improvements schemes
have have been completed delivering a further upgrade the lighting stock. 
The Carry Over and the capital budget of £150k for 2024/25 9as per the table above) will see this column
and cable replacement works continue. 
Risks
1. Insufficient investment may lead to column and or systems failure with the possibility/risk of damage to
individuals/property.
Page 203

Page 204

2. Health and safety concerns re columns that are old and rusted with the potential to fall down in adverse
weather.
3. Lack of reliability and increased outages would lead to a corresponding increase in customer
contact/complaints and a negative impact on the Council’s reputation. 
Summary of Planned 2025-26 investment
Investment Strategy at funding levels indicated above 
Lighting has benefited from investment to change luminaires to low energy LED. This has approximately
halved our energy consumption and has provided benefits with significantly reduced light pollution and
which benefits dark skies. 
Without continued investment for an aged cabling and column inventory, we will only be able to plan to
improve a small percentage of lighting assets. We prioritise funding through a study of any planned
maintenance findings, analysis of fault records and reliability, light level meter checks for inadequacies,
column condition scores – all will be considered to compile and prioritise programs of work. 
Possible Savings Proposals Currently Being Considered.
Argyll and Bute could consider switching lights off between midnight and 05:00hrs. Potential savings if
street lighting is switched off between midnight and 5am are significant. The figures have been calculated
using the current inventory with any non-street lighting equipment (signals, beacons, sign lights,
controllers etc) excluded.  When calculating the switch off kWh’s, any item that currently operates on a
dimmed profile has been calculated as being in the appropriate dimmed state outside of the switch off
period.
It’s estimated that around 30% of the Street Lighting Inventory is switched on/off by Photocells fitted to
the Luminaires. Photocells react to natural light levels and bring lights on at dusk and switch them off at
dawn. 70% of the network is controlled by Time Clocks where we’d currently be able to set times for
specific or altered burning regimes. Time clocks would need to be introduced across the whole of the
network to set any new switching regime so there would need to be a spend to save approach applied. 
Top three service/asset group priorities 
Service Priority Cost (£) Are costs
indicative
or
calculated)
Estimated
funding
shortfall
Asset category (asset sustainability,
service development, strategic
change)
1. Completion of
LED installation
programme
LED Business
Case
Calculated 0 Asset sustainability
2. Column
replacement and
cabling works
£854k Calculated * Asset sustainability
3. Continue asset
sustainability
works
tbc Indicative
– value tbc
* Asset sustainability
 The review of the LED, column and cabling requirements for street lighting will identify funding
requirements for future lighting works. 
Match funding Opportunities/External Funding 
Achieved 2024-25 Opportunities 2025-26
Page 204

Page 205

Asset Sustainability  
Service Development   
Strategic Change   
Limited opportunities for match funding/external funding. Historically Scottish Futures Trust have
provided interest free loans for lighting however it is understood that this funding stream is no longer
available. 
Links to relevant strategies
LED strategy for converting low efficiency luminaires to LED.
Climate Change strategy. 
Page 205

Page 206

PRIORITY INVESTMENT PLAN – ASSET GROUP 3 SUMMARY 
Asset Group Amenity  3rd Tier Manager Hugh O’Neill and Tom Murphy
Description of
Asset Group
and Condition
Assessment 
Argyll and Bute Council has 131 Cemeteries with 68 Closed for the sale of lairs. They are however
still being opened for interments as well as the Council being responsible for the upkeep of the
Cemetery. They have been listed as Suitability D in the above Table. 
63 Cemeteries are open for the sale of lairs, however they have been broken down in the
condition table to whether they have 20+ years Condition A, 10-20 years Condition B, 5-10 years
Condition C and 0-5 years capacity Condition D. 
Argyll and Bute Council have 30 Play parks which are listed as D in urgent need of repair, C in need
of repair, B minor repairs needed and A in good order.
Argyll and Bute Council have 25 Sports pitches parks which are listed as D in urgent need of repair,
C in need of repair, B minor repairs needed and A in good order. 
Argyll and Bute Council have 60 Public Conveniences are listed as D in urgent need of repair, C in
need of repair, B minor repairs needed and A in good order from the condition survey.
- Sports Fields - We have 25 Sport Fields which cater for a mix of football/shinty and rugby. We
have listed them as A=Good condition/B=Reasonable Condition/C=Poor Condition. Most
require drainage work as well as work to improve the playing surfaces of the pitches and
update/replace fencing.
- Stadiums – We have 3 stadiums which are listed as 2 in good condition and 1 in poor
condition
- Toilets – 16 high footfall public conveniences are in the process of having charging
infrastructure installed through a £300,000 scheme [£100,000 Council capital; £200,000
Coastal Communities]. Income received can be used to meet previously unachieved income
targets. Depending on the level of income received, information from these 16 sites following
the fitting of the charging infrastructure can be used in a business case to consider extending
the number of public conveniences where charges are made. 
Asset Group No and/or value. Condition Suitability
A B C D A B C D
Cemetery 131 47 8 3 5 0 0 0 68
Parks and Open Spaces 30 Play Parks 6 4 18 2 4 6 16 4
Parks and Open Spaces Sports Fields 5 6 14 0 3 6 9 7
Parks and Open Spaces Stadium 2 0 1 0 0 3 0 0
Toilet facilities 55 7 20 27 6 6 15 20 19
Investment
(current and
planned)  Funding  Funding source 
Current Year Anticipated Investment (£m)
2024-25 (£m)    2025-26 2026-27 2027-28
Block Allocation Scottish
Government
0.100 0.100 0.000 0.000
Block Allocation
Carried Forward
Scottish
Government
0.029   
Capital Grant
(Play Parks)
Scottish
Government
0.547 0.391  
Coastal
Communities
Fund
Crown Estate 0.400 0.109  
Additional
Allocation -
Cemeteries 
Council 0.310   
1.386 0.600 0.000 0.000 
2024-25 Overview
Page 206

Page 207

Investment Strategy
Cemeteries
Officers are reviewing the capacity of cemeteries, those with less than 5 years capacity are prioritised in line with
budget availability. Cemeteries are either extended or when this is not possible then nearby land is identified where
possible within Council ownership and if not then land owners are approached to purchase land. To support
cemeteries with less than 5-10 years capacity, the EDI Committee has agreed a policy in regards to lair availability,
whereby the pre-sale of lairs is stopped when capacity is less than 5-10 years. There is currently funding within the
Capital Budget which at this time will cover the immediate requirements. However this is dependent on whether
officers can purchase land at a reasonable cost as well as abiding by SEPA rules which have been tightened around
water courses. Further to this, although predicted in the listed years this again is dependent on work with land
owners where delays are outwith officers control.
Play Parks 
Play Parks have been reviewed by trained officers to identify defective equipment and surfaces. Previously no
funding has been available and defective equipment has either been removed or fenced off. On occasion funding
sources have been identified to locally refurbish equipment and play parks such as Atlantis in Oban. Engagement has
concluded with elected members to agree a suitable spend for the budget locally. Play park funding will be covered
by the Scottish Govt budget for another two years. There are no further plans to develop play parks further than this.
Pitches 
Most pitches are in need of drainage work as well as work to improve the playing surfaces of the pitches and
update/replace fencing. Several pitches have previously had drainage works carried out and now at least 6 need
urgent drainage works to enable sports to be played on the pitches following wet periods.
In regards to Rothesay Stadium, this requires extensive drainage works as well as building works to ensure health and
safety is not compromised. Work is also required to continue to improve the mobile stand, to alleviate this issue and
support the Bute Games Operations staff have made this a permamnent structure rather than a temporary stand.
This works but requires an annual application for planning.
Public Conveniences
Various public conveniences (PC) are undergoing improvements and general upgrades. At the P&R Committee
meeting on 13/10/22 additional funding was approved subject to SG confirming the anticipated level of Coastal
Communities funding being received.  16 high footfall public conveniences are in the process of having charging
infrastructure installed through a £300,000 scheme. 16 PCs are being upgraded to door entry systems which will
generate an income, through door payment systems, for the council which will contribute towards the asset
sustainability and general day to day maintenance of the PCs.
The service has developed a number of robust partnerships with community groups to assist with the opening,
closing, stocking and maintenance of public conveniences. This partnership approach, whilst fostering a collaborative
arrangement with the community, it also helps to reduce direct costs to the Council. As a general rule the Council
maintain full responsibility for the maintenance of the fabric of the building with the community groups carrying out
the day to day servicing and cleaning duties. The locations with partnerships in place are:
Ardentinney
Tayinloan
Pensioners Row
Calgary
Scaranish 
Officers are waiting on the proposed partnership with MICT being approved (Internally). This will allow MICT to open
their facility as a Public Convenience and the Council to remove the existing toilet block which is in poor condition.
Reservoirs 
The Council is defined as Reservoir Manager for 2 assets at Kirk Dam, Rothesay and Bishops Glen, Dunoon.  There is a
requirement to regularly inspect these structures and undertake any remedial works that are specified in the interest
of safety and enforceable by SEPA.  
Risks of insufficient funding to carry out asset sustainability and asset improvement works:
Page 207

Page 208

1. As a Burial Authority, the Council will risk being in breach of legislation should there not be sufficient funding
for cemetery expansion and development. Further, this will damage the council’s reputation should more
cemeteries close and cause negative feedback from deceased relatives etc.
2. Sports pitches would become unfit for purpose which would be detrimental to the council’s objective of a
healthy community. This would also see clubs using all weather facilities at the council’s High schools, this
has recently been raised as an issue with clubs being unable to book the pitches due to over subscription.
Officers have also experienced sports clubs taking their bookings to neighbouring authorities.
Ongoing discussions with the local sports group regarding the development of Mossfield stadium in Oban
have paused pending sufficient information to satisfy external funders/grant organisations.
Discussions are ongoing with Oban rugby club around improvement to the pitch the club use adjacent to
Mossfield stadium.
3. Breach of Health and Safety legislation if toilets are not maintained in a good condition and reputational
damage to the Council. Not maintaining our public conveniences also limits the opportunities for the council
to engage with potential third sector partners. It is interesting to note that there is no financial allocation
through the GAE settlement for public conveniences. 
Summary of Planned 2025-26 investment
Investment Strategy at funding levels indicated above
1. Cemetery investment continues to be prioritised on extending cemeteries with limited life as per the asset
cemetery plan considered by EDI Committee in November 2023. 
2. Sports field investment will be prioritised towards proportionate works which ensure that the sports facilities are
available and fit for purpose for both young people and adults. Much of this work would include drainage of the
playing surface, boundary fencing and any lighting together with changing rooms and associated buildings etc. All of
these works effectively falling within the asset sustainability category.
3. Investment in playing fields would be prioritised where third party external funding can also be secured
encouraging community groups to secure investment and work in partnership with the Council where this can be
demonstrated to be sustainable long term.
4. Public convenience investment will be used to ensure we meet statutory requirements in terms of health and
safety and public health. 
5. Where business cases stack up, further investment over and above the 16 currently funded, will be made to
generate income and a self-financing model through additional charging infrastructure being installed.
Unfunded Capital Pressures 
Service Priority Cost (£) Are costs
indicative
or
calculated)
Estimated
funding
shortfall
Asset category (asset sustainability,
service development, strategic
change)
1. Sports facilities/playing
fields areas
£938k Indicative  £938 Asset Sustainability – carrying out
proportionate works to ensure
sports areas/playing field are
available and fit for purpose. Works
will be prioritised base on health and
safety, facility use and value for
money.
Experience of previous expansion and land purchase timescales highlights that at least 5 years are required in some
cases to identify, source, purchase and prepare the land for use as a cemetery. This continues annually with work
ongoing to estimate further budget costs.
Match funding Opportunities/External Funding 
Achieved 2025-26 Opportunities 2026-27
Asset Sustainability  £391k from Scottish Govt Play Park
Fund 
Page 208

Page 209

Service Development   Currently ongoing partnership discussions
with sports clubs in Oban around attracting
local investment to improve Mossfield
Stadium and other sports fields in the Oban
and Lorn area.
Potential opportunities which are being
pursued with the local sports group
regarding the development of Mossfield
stadium in Oban have paused due to the
committee requiring to obtain certain
aspects to satisfy potential funders.
Discussions are ongoing with Oban rugby
club around improvement to the pitch the
club use adjacent to Mossfield stadium. 
Strategic Change   
Links to relevant strategies:
Play Park and Cemeteries: December EDI (Items 5 and 7). 
Page 209

Page 210

PRIORITY INVESTMENT PLAN – ASSET GROUP 2 SUMMARY 
Asset Group Bridges and Coastal
Protection
3rd tier
Manager
Elsa Simoes 
Description of
Asset Group
and Condition
Assessment 
BRIDGES:
903 Bridges (over 1.5m span)
Increase of 1 since March 2023
Culverts under 1.5m span arenot classified as bridge structures and so are ot included the figure
above.
677 Retaining Walls (over 1.35m retained height) recorded on Council systems, however it is
recognised that a gap in data is likely to exist and this figure is therefore regarded to represent
circa  80% of the total number of retaining walls. 
Retaining walls under 1.35m retained height are not included within this figure.
Bridge Condition is calculated through Structural Inspections carried out by Bridge Inspectors and
are rcorded on bespoke Asset Management Software.
Structural condition is measured through inspection of assets which considers each element of a
structure.  National guidance documents are utilised as well as a standardised Asset Management
system. 
The Bridge Stock Condition is now reported on a weighted average per span figure.  The recent
results are shown in the table below: 
Average
Bridge Stock
Condition
(out of 100)
Critical
Element Stock
Condition
(out of 100)
2022-24 Cycle 87.86 79.08
2020-22 Cycle 89.03 80.44
2018-20 Cycle 89.73 82.24
2016-18 Cycle 89.46 82.40
Over recent years there has been a slow decline in bridge stock condition.
There is an estimated backlog of maintenance liability totalling £32.4m. With the following bridges
subject to weight restrictions.
Bridge No. & Name Area
Restriction
(MGW)
A846-239 LAGGAN OLD (Weak Bridge) Islay 10T
B8025-020 ISLAND ADD (Weak Bridge) Mid Argyll 3T
B866-020 GLACHAVOIL (Weak Bridge) Cowal 7.5T
C012-050 MILINDRY SCHOOL (Weak Bridge) Islay 13T
C038-010 BRIDGEND (Weak Bridge) Mid Argyll 18T
C038-050 BARMOLLOCH (Weak Bridge) Mid Argyll 18T
C057-010 OLD BALLIEBEG (Weak Bridge) Cowal 18T
U010-090 LEACAINN (BRENACHOILLE) (Weak Bridge) Mid Argyll 7.5T
U010-100 BRANDON STREET (Weak Bridge) Cowal 7.5T
U021-020 IRON (Weak Bridge) Islay 3T
U022-050 GLENDARUEL (Weak Bridge) Cowal 3T
U027-010 MILLHOUSE (Weak Bridge) Cowal 18T
U031-010 NEWTON BURN (Weak Bridge) Cowal 10T
U042-100 AIRDS HOTEL (Weak Bridge) Lorn 10T
U046-010 KILBRIDE (Weak Bridge) Cowal 10T   
Page 210

Page 211

Investment
(current and
planned)  Funding 
Funding
source 
Current Year Anticipated Investment (£m)
2024-25 (£m)
2025-26
(£m)
2026-
27(£m)
2027-
28(£m)
Block
Allocation
Scottish
Government 0.000 0.750 0.000 0.000
Block
Allocation
Carried
Forward
Scottish
Government 0.315 1.248 0.000 0.000
Local Bridge
Maintenance
Fund
Scottish
Government   0.230 4.777 0.000 0.000
Capital Coastal
Change
Adaption 
Scottish
Government 0.255 0.299 0.000 0.000
Bute Sea Wall Council 0.274 0.359 0.000 0.000
Total  1.074 7.433 0.000 0.000 
2024-25 Overview 
Investment Strategy
BRIDGES and COASTAL PROTECTION:
Investment Strategy
Bridge Inspections are carried out every 24 months in accordance with Well Managed Highways
Infrastructure Code of Practice and DMRB Standards.
Principal Inspections / Structural Reviews / Bridge Assessments are undertaken to determine
priority of strengthening/improvement works.
Capital Bridge Strengthening and Replacement Programme is prioritised using a risk-based
methodology which considers overall condition and risk of structure, extent and severity of defects,
usage of structure and engineering judgement.  This methodology has been modified in recent
years to take account of new SCOTS guidance.
Revenue Structural Maintenance is currently prioritised using a risk-based methodology which
considers overall condition of structure, extent and severity of defects, usage of structure and
engineering judgement.  
Structures Investment:
1) Capital Bridge Strengthening and Replacement Programme (including LBMF)
a. Strengthening & Replacement of Bridges & Retaining Walls
2) Revenue Structural Maintenance
a. Bridge & Wall Inspections
b. Bridge & Wall Maintenance Repairs 
c. Technical Approval 
d. Asset Management
3) Revenue Structural Assessment
a. Assessment of Bridges and Retaining Walls
b. Management of Abnormal Load Notifications 
Coastal Protection Investment:
Page 211

Page 212

1) Capital Coastal Protection
a. Repair, Strengthening & Replacement of Coastal Protection Assets
2) Revenue Coastal Protection:
a. Coastal Protection Inspections
b. Coastal Protection Maintenance Repairs 
c. Asset Management 
Risks
The current level of capital & revenue funding is expected to result in an ongoing decline in the
overall condition of bridge and coastal protection assets and an increase in the number of bridges
subject to weight and other restrictions. This will be reflected in a reduction in the overall Bridge
Condition indicator (BCi).
1. Increase in risk of bridge/road weight restrictions or closures thereby decreasing the overall
functionality of the local road network. 
2. Potential for communities being left isolated should any single access areas have closures or
restrictions imposed. For example Seil, Easdale and Luing communities will be severely affected if
Kilninver bridge had to have a restriction.
3. Inspections, assessments and works are prioritised to best manage the risks versus available
funding and the Council’s responsibilities for its assets.
Summary of Planned 2025-26 investment
Investment Strategy at funding levels indicated above
Top three service/asset group priorities 
Service Priority Cost (£) Are costs
indicative or
calculated)
Estimated
funding shortfall
Asset category (asset
sustainability, service
development, strategic
change)
Bridges
Bridge Strengthening
and Replacement
28m indicative 21m Asset sustainability
Structures
Maintenance
4.366m indicative 4.066m Asset sustainability
Coastal Protection 25m indicative 23.4m Asset sustainability 
The above table illustrates the total estimated backlog maintenance liability in relation to bridges and
coastal protection. Assuming a 10-year programme of increased pro-active maintnenance to improve the
condition of these asset groups and remove the backlog maintenance liability the funding shortfall for the
2025/26 financial year would be:
Service Priority Cost (£) Are costs
indicative or
calculated)
Estimated
funding shortfall
Asset category (asset
sustainability, service
development, strategic
change)
Bridg Bridge Strengthening
and Replacement
£2.8m indicative £2.1m Asset sustainability
Page 212

Page 213

Structures
Maintenance
£0.437m indicative £0.407m Asset sustainability
Coastal Protection £2.5m indicative £2.34m Asset sustainability 
Match funding Opportunities/External Funding 
Achieved 2024-25 Opportunities 2025-26
Asset Sustainability  COASTAL CHANGE ADAPTATION
 £60k Coastal Change
Adaptation funding
secured for and donated to
Luing Community.
 £129,690 Coastal Change
Adaptation Capital Grant
2024-25.
COASTAL PROTECTION
COASTAL CHANGE ADAPTATION
 Dynamic Coast Project funding
(coastal change)
 Coastal Change Adaptation
(£250k secured) 
BRIDGES
 Any future rounds of Scottish
Government’s Local Bridge
Maintenance Fund
Service Development   
Strategic Change   
Links to relevant strategies
BRIDGES:
 LEGISLATION - Roads (Scotland) Act 1984
 CODE OF PRACTICE - Code of Practice 'Well-managed highway infrastructure'
 DESIGN STANDARDS - DMRB - Highway Structures & Bridges Series 
 PLAN - Argyll and Bute Council - Roads Asset Management Plan (RAMP) - June 2017 
COASTAL PROTECTION:
 LEGISLATION - Coast Protection Act 1949
 POLICY - Argyll and Bute Council - Coast Protection Policy and Strategy - March 2015 
Page 213

Page 214

PRIORITY INVESTMENT PLAN – ASSET GROUP 2 SUMMARY 
Asset Group Flood Risk Management 3rd tier
Manager
Elsa Simoes 
Description of
Asset Group
and Condition
Assessment 
FLOOD PROTECTION INFRASTRUCTURE:
Designed flood protection schemes in Rothesay (coastal), Dunoon (two no. fluvial
alleviation schemes; Milton Burn and Kilbride Road).  No formal condition rating. 
Concerns about Rothesay FPS are known. Investigations and studies are ongoing
to determine future maintenance requirements.
Kilcreggan SWMP identified Tigh Dearg Road and foul drainage issues –
construction works ongoing and scheduled for completion in late 2024.
Helensburgh surface water drainage has also been identified and designs are in
abeyance. 
Other informal structures which provide flood protection to population centres
would require to be documented in order to quantify the asset, owner, and
condition.  This is in part the purpose of the Local Flood Risk Management Plan
2022-2028, to assess risk in those areas affected by flooding.
Watercourse assessments to be carried out and a schedule of clearance and
repair works to be programmed. 
A Surface Water Management Plan has been incorporated into the Campbeltown
Flood Protection Scheme and the Council aims to prioritise other areas
respectively.
Revenue funded temporary mitigation scheme in Oban is being progressed which
includes watercourse inspections, clearance of obstructions, topographic and
Bathymetric surveys, hydrologic study, repair of an existing pumping system at
Lochavullin car park, consultations with SEPA on consents (for protected
amphibians, invasive species and other matters under their remit) and securing
of quotes for proposed works to identify if funding can be secured from available
budgets or otherwise.
Coastal Change Adaptation Plans are a requirement from the Flood Risk
Management Plans.  The Council is progressing Plans for the first selected areas
with a specialist consultant. 
The current focus of delivery are the two Local Flood Risk Management Plans
which relate to Argyll and Bute as described in this document (Highland and
Argyll, Clyde and Loch Lomond).
The maintenance backlog on designed flood protection assets is currently
minimal (Rothesay and Dunoon) as these assets are relatively new.  Current flood
alleviation assets are maintained under a combination of flood, coastal, and
roads budgets depending upon the context. 
On a wider scale there are under and un-designed flood protection assets
throughout Argyll and Bute which are not formally recognised as such and may
not be owned by the Council but serve this purpose e.g. the banks of the Black
Lynn through Oban.  There is an unknown backlog on such assets but would
certainly run to tens of millions of pounds of investment to bring to an ideal
condition.
Scottish Government recently advised that there is no prospect of any future
funding for Flood Protection Schemes in the near term. 
Page 214

Page 215

Investment
(current and
planned)  Funding 
Funding
source 
Current Year Anticipated Investment (£m)
2024-25
(£m)
2025-26
(£m)
2026-27
(£m)
2027-28
(£m)
Block
Allocation
Scottish
Government 0.306 0.656 0.156 0.156
Block
Allocation
Carried
Forward
Scottish
Government 0.907 (0.156) (0.156) 0.000
Helensburgh
Flood
Mitigation
Council 0.000 0.427 0.000 0.000
Campbeltown
Flood Scheme 
Scottish
Government
& Council 
1.780  0.010 0.387 0.000
Totals  2.993 0.937 0.387 0.000 
2024-25 Overview 
Investment Strategy
FLOOD PROTECTION INFRASTRUCTURE:
Investment Strategy
On a strategic scale this is through the Local Flood Risk Management Plan(s) and the SEPA led
National Flood Risk Assessment process to consider local history and impact of flooding as well as
national flood risk based on climate change predictions – all in accordance with Flood Risk
Management (Scotland) Act 2009. 
The cost of implementing flood protection schemes has to be less than the damages avoided i.e. a
benefit cost ratio of greater than one. Non-economic benefits are also being considered by SEPA.
However, the weighting this has on its prioritisation is being considered by the Scottish
Government and COSLA.
Risks
1. A key risk is the now confirmed loss of further investment from Scottish Government. There was
a defined process currently for assessing flood risk and prioritising investment across Scotland. 
2. Road closures and loss of assets – Several population centres in Argyll and Bute will be at
significant risk of more frequent flooding in the future with climate change. Communities living
along lifeline roads may be cut off temporarily. This will lead to considerable financial impact to
properties and businesses. Ultimately, significant flooding events can lead to loss of life.
Summary of Planned 2025-26 investment
Investment Strategy at funding levels indicated above 
Top three service/asset group priorities 
Service Priority Cost (£) Are costs
indicative or
calculated)
Estimated
funding shortfall
Asset category (asset
sustainability, service
development, strategic
change)
Page 215

Page 216

1. Flood Protection
Delivering cycle two
and three schemes as
per the Local Flood
Risk Management Plan
cycle one and two
flood studies.
41.290m
(based on
2019 flood
study
costs)
2019
indicative
costs 
Strategic Change. The
Council is not under an
obligation to deliver these
schemes and no approval
for them has been
received. 
Carrying out works as
identified under
section 18 scheduled
of clearance and
repair. 
TBC TBC TBC. Asset Sustainability
Carry out emergency 
and urgent reactive
works punctually
Unknown N/A Unknown Asset Sustainability 
Match funding Opportunities/External Funding 
Achieved 2024-25 Opportunities 2025-26
Asset Sustainability  
Service Development   
Strategic Change FLOOD PROTECTION
INFRASTRUCTURE:
 £12.172m (80%)
contribution for
Campbeltown Flood
Protection Scheme FPS
from Scottish Government. 
Links to relevant strategies
FLOOD RISK MANAGEMENT:
 LEGISLATION - Flood Risk Management (Scotland) Act 2009
 ADOPTED PLANS:
o Highland & Argyll Local Flood Risk Management Plan (Cycle 2)
o Clyde and Loch Lomond Local Flood Risk Management Plan (Cycle 2)
 ADOPTED POLICY - Argyll and Bute Council - Flood Risk Management Policy – March 2015
 NOTIFIED FLOOD PROTECTION SCHEME - Campbeltown Flood Protection Scheme 
Page 216

Page 217

PRIORITY INVESTMENT PLAN – ASSET GROUP SUMMARY 
Asset Group Fleet Services 3rd Tier Manager John Blake
Description of
Asset Group
and Condition
Assessment 
Fleet services have reviewed market costs for petrol/ diesel vehicles and the cost of alternatively
fuelled vehicles, e.g. electric vehicles to comply with the changes imposed by Scottish
Government which prevent public bodies from purchasing small vehicles (cars and small vans)
with internal combustion engines post 2025. The figures below are based on a replacement values
for this part of the Councils fleet with alternatively fueled vehicles. 
Asset Group No and
or/Value*
CONDITION
(percentages based on total asset value)
Green
/
Purple
Yellow Amber Red
Cars and Small vans:
Changes to legislation
within the public sector
informs us that from 2025
no petrol or diesel cars or
light vans can be purchased
Suitable replacements will
be electric vehicles. 
Circa £8m to
replace the
existing Fleet
which are 7
years or
older with
compliant
alternatively
fueled
vehicles. 
40% 20% 20% 20.00% 
Fleet Services No. Condition Suitability
A B C D A B C D
Fleet vehicles & plant equipment 504        
TOTAL 504        
Investment
(current and
planned) 
Funding  Funding source Current Year Anticipated Investment (£m)
2024-25 (£m) 2025-26 2026-27 2027-28
Block Allocation
Scottish
Government 0.000 0.500 0.000 0.000
Prudential
Borrowing
Council
2.152 0.000 0.000 0.000
Earmarked
Reserves
Capital
0.258 0.000 0.000 0.000
Community Bus
Fund
Scottish
Government 0.233 0.000 0.000 0.000 
Total  2.643 0.500 0.000 0.000  
2023-24 Overview 
Summary of Planned 2024-25 investment
Investment Strategy at funding levels indicated above
Asset sustainability - The Council has a duty to ensure vehicles are fit for purpose and comply with current legislation. 
Due to increasing repair and maintenance costs, an essential vehicle replacement programme continues when
funding is made available. Capital and revenue savings have been identified in the procurement of new vehicles. With
smaller vehicles having to be replaced with zero emission vehicles/electric vehicles beyond 2025. There is an
anticipated increase in vehicle replacement costs associated with climate friendly alternatives. The cost of replacing
cars and small vans beyond 2025 is £8.23m in capital expenditure over a 5-year replacement programme period or
Page 217

Page 218

revenue expenditure of £1.5m per annum in revenue costs.  Over a 5-year period the capital cost of undertaking this
replacement programme would be £1.646m p.a.
Vehicle replacements will be programmed ensuring that suitable, reliable fleet vehicles and plant equipment are
available for service users, and with limited capital investment this will possibly be achieved through prudential
borrowing. 
This will also contribute to climate change with more modern vehicles purchased and reduced CO2 emissions
contributing to the wider council net zero ambitions. 
A full replacement of the Councils entire fleet would be at a cost of £18m i.e. an additional £10m over and above the
cost of replacing the cars and small vans. The remainder of the vehicle replacement programme would ideally be
undertaken over a 7-year period. Over a 7-year period the cost per annum of replacing this remaining part of the
Councils fleet would be £1.429m p.a.
UNFUNDED PRIORITIES 
Service Priority Cost (£) Are costs
indicative or
calculated)
Estimated
funding
shortfall
Asset category (asset
sustainability, service
development, strategic change)
1. Cars and small vans:
Changes to legislation
within the public
sector informs us that
from 2025 no petrol
or diesel cars or light
vans can be
purchased as suitable
replacements. Electric
vehicles will be
required to be
procured. This will
represent a higher
purchase cost than at
present. Based on age
and condition of the
existing vehicle stock
a 5-year replacement
programme is
recommended at a
total cost of £8.23m.
This results in an
annual programme of
£1.646m
1.646m Calculated  £1.146m  Asset sustainability (like for like
service will be the outcome).
Improved C02 emmisisons.
2. All other vehicles and
plant: Based on a 7-
year average vehicle
replacement period
for the remaining
proportion of the
Councils fleet and
plant and an
estimated total
replacement cost of
£10m the annual
replacement cost is
estimated at £1.429m
£1.429m Indicative £1.429m Asset sustainability (like for like
service will be the outcome) 
Match funding Opportunities/External Funding 
Achieved 2024-25 Opportunities 2025-26
Page 218

Page 219

Asset Sustainability  None identified None identified
Service Development  None identified Funding sources relating to roll out of
petrol / diesel phase out beyond 2025
Strategic Change None identified None identified 
Links to relevant strategies 
Page 219

Page 220

PRIORITY INVESTMENT PLAN – ASSET GROUP SUMMARY
Asset Group Waste Services 3rd Tier Manager John Blake
Description of
Asset Group
and Condition
Assessment 
SEPA condition surveys and site monitoring to ensure compliance with environmental
legislation. The sites are permitted by SEPA to operate the sites. Biffa through a Waste
PPP contract manage sites on behalf of the Council.  The sites include civic amenity and
landfill sites at the one locus, mixed waste, recycling etc. is managed on site. Biffa
manage Moleigh, Dalinlongart, Lingerton, Westland’s, Roading and Bogleha. The Council
manage sites on Islay, Mull, Tiree and small civic amenity site on Coll and Colonsay.
Officers monitor the requirements for each site. Biffa have the responsibility for
infrastructure within the Waste PPP sites. 
Investment is required at Dalinlongart, Lingerton, Council operated sites – Gartbreck and
Glengorm, there is likely to be a requirement for capital investment of £6m (estimate) for
cell capping, environmental monitoring, annual surveys, additional boreholes for gas
related equipment, replacements pumps, leachate monitoring points, relining of leachate
lagoons and reed beds beyond the contract term in financial years 2026-27. This
investment would be made through capital funds. However, if revenue funding is
available this could be used to undertake the required works.  
Asset Group No and
or/Value*
CONDITION
(percentages based on total asset value)
Green/
Purple Yellow Amber Red
Moleigh, Dalinlongart,
Westland’s and Lingerton.  £6.0million 0% 0% 0% 100.00% 
Investment
(current and
planned) 
Funding  Funding source  Current Year Anticipated Investment (£m)
2024-25 (£m) 2025-26 2026-27 2027-28
Block Allocation  Scottish
Government 0.279 0.000 0.000 0.000
Earmarked
Reserves Council 0.250 0.000 0.000 0.000  
0.529 0.000 0.000 0.000 
2024-25 Overview 
Investment Strategy
Assessment and review is conducted by officers. Property have the responsibility for assessing any
requirements or maintenance to the sites. Asset Sustainability is the primary driver for investment,
however, there is a lack of investment made at sites. 
Risks
1. Future ongoing investment will be required to meet the site licence requirements that are regulated
by SEPA. An estimated £6.0m is required beyond the Biodegradable Municipal Waste (BMW) Ban for
site works and the requirement for on-going capital costs. Funding to achieve compliance has not been
identified. This funding will be required to cap and restore all landfill sites as no waste material will be
landfilled as per SEPA regaulations. 
2. Non-compliance with statutory requirements and likely prosecution by SEPA if compliance is not met. 
Summary of Planned 2025-26 investment
Page 220

Page 221

Investment Strategy at funding levels indicated above
Funding is in place to convert the MBT sheds which are currently part of the PPP contract with Biffa to
transfer stations and also to provide a waste transfer station in Helensburgh.
Investment is required on all sites within the next 30-60 years, the Council sites will require investment at
varying stages, the lower level cost for the management of the sites are £10.929m – higher level costs are
£16.085m. The investment will be required under Asset Sustainability to ensure that the conditions of the
site licences are met. Licence conditions are monitored by the regulator SEPA. The works will include but
not be limited to reed bed restoration, leachate monitoring equipment, landscaping, perimeter fencing,
building maintenance, access roads etc.  No immediate investment is required, this should however be
noted within any horizon planning. 
UNFUNDED PRIORITES 
Service Priority Cost (£) Are costs
indicative
or
calculated)
Estimated
funding
shortfall
Asset category (asset sustainability,
service development, strategic
change)
1. Dalinlongart,
Lingerton, Moliegh,
Council sites –
Gartbreck and
Glengorm site
maintenance.
Capping and
restoration  of sites. 
£6.0m Indicative £6.0m
post BMW
Ban 
Asset sustainability, service
development, strategic change,
2026-27
2.    
3.     
Match funding Opportunities/External Funding 
Achieved 2024-25 Opportunities 2025-26
Asset Sustainability N/A N/A
Service Development  Compliance with SEPA
requirements and site
management. 
Recycling Infrastructure
Fund (RIF) Bid – Island +
Helensburgh – approx.
£891k. Infrastructure
improvements at Council
operated sites. 
Waste Transfer Station –
funds of £3.0m have been
allocated for the
development of a waste
transfer station in H&L. A
further £0.5m has been
allocated to convert the
existing MBT plants located
at Renewi sites Dalinlongart,
Lingerton and Moleigh.
Strategic Change N/A N/A 
Page 221

Page 222

Links to relevant strategies
Argyll and Bute Council’s Waste Strategy. 
Page 222

Page 223

PRIORITY INVESTMENT PLAN – 9. Piers & Harbours 
Asset Group Transport Infrastructure: Piers & Harbours 3rd Tier
Managers
Scott Reid
Marine Operations Manager 
Description of
Asset Group
and Condition
Assessment 
Asset Group 
Piers and Harbours
CONDITION
Green Yellow Amber Red
Marine Asset Management Plan (MAMP):
Argyll and Bute Council is a Statutory Harbour Authority
at 8 locations and a marine asset owner at a further 29
marine facilities located throughout the Council area.
Marine infrastructure is developed through a capital
investment Marine Asset Management Plan for the
Marine Capital Investment Board and ultimately
approved by elected Members of the Argyll and Bute
Council Harbour Board.
This supports infrastructure upgrades for CalMac ferry
service upgrades but also includes Argyll & Bute Council
ferry infrastructure upgrades and required
modifications for legislative changes. 
80% 10% 5% 5% 
Investment  Funding
Funding source  Current Year Anticipated Investment (£m)
2024-25 (£m) 2025-26 2026-27 2027-28
Marrine Asset
Management
Plan
Prudential
borrowing 17.693 35.406 34.900 30.000 
2024-25 Overview
Investment Strategy
Technical condition surveys, inspections and assurance audits inform condition assessments.
Regular reports are made to the Marine Capital Board and the Council’s Harbour Board.
In the MAMP, priority is determined considering lifeline ferry services and required modifications or upgrades to
support new vessels deployments and national strategies like the Islands Connectivity Plan. Priorities are confirmed
by investment boards and Harbour Board.
Marine Risks
1. Impact to Island Community Connectivity.
2. Potential increase in claims for vessel damage and reputational risk to the Council.
3. Potential increase in funds required to repair infrastructures following underinvestment. 
Summary of Planned 2024-2025 investment
Investment Strategy at funding levels indicated above
Top service priorities alongside the Capital Plan
None
Match funding Opportunities/External Funding 
Achieved 2023-24 Opportunities 2024-25
Service Development   Islands Programme application for
funding for Port Askaig crew
accommodation and concept design for
Page 223

Page 224

ferry. This was ultimately unsuccessful
(Nov 24).
Potential ex-SPT funds via HITRANS to
fund aspects of Jura and Luing services.
Strategic Change  Community Regeneration Fund 
Links to relevant strategies: Islands Connectivity Plan 
Page 224

Page 225

PRIORITY INVESTMENT PLAN – ASSET GROUP 6 SUMMARY 
Asset Group Transport Infrastructure: Council Ferries 3rd Tier
Managers
Scott Reid
Marine Operations Manager 
Description of
Asset Group
and Condition
Assessment 
Asset Group
Vessels
CONDITION
(percentages based on total asset value)
Green Yellow Amber Red
MV Lady of Lismore (2022) Passenger service only,
linking Port Appin & Lismore. 100% 0% 0% 0%
Eilean Dhiura (1998) Vehicle Ro-Ro & passenger
service, linking Islay & Jura 0% 75% 25% 0%
MV Belnahua (1972) Vehicle and passenger service,
linking Seil & Luing 0% 75% 25% 0%
ML Torsa (1996) Open workboat passenger service
only, linking Seil & Luing 0% 25% 0% 75%
ML Fladda (1994) Open workboat passenger service
only, linking Easdale & Seil 0% 25% 0% 75%
ML Easdale (1992) Open workboat passenger service
only, linking Easdale & Seil  0% 25% 0% 75% 
Investment  Funding
Funding source  Current Year Anticipated Investment (£m)
2024-25 (£m) 2025-26 2026-27 2027-28
Lismore Ferry
Scottish
Government 0.035 0.000 0.000 0.000 
2024-25 Overview
Investment Strategy
External investment from Scottish Government has been requested.
The life extension works for the vehicle carrying vessels has been covered by grant allocation to date.
Marine Risks
1. Impact to Island Community Connectivity. 
Summary of Planned 2024-2025 investment
Investment Strategy at funding levels indicated above
Top service priorities alongside the Capital Plan
Ferry Service and supporting Infrastructure Priorities
Vessel Priority Description Benefits
1 On-site accommodation at Port Askaig.
Present situation requires Officers and
crew to be residents of Islay as well as
suitably qualified.
Along with the market supplement and the 7-
day rota, this will allow the recruitment of
suitably certified Officers required for
resilience and new vessel minimum manning
levels.
2 Funding for concept design to ‘Keel Ready’
for the new Jura vessel.
To identify capacity levels; fuel type; crew
size and infrastructure upgrade
requirements. Also allows for a more
accurate assessment / estimate of build &
certification costs.
3 Jura New Build (and associated
infrastructure at Feolin & Port Askaig).
Fit for purpose and the future vessel to
support the Jura community for the next 20 –
30 years.
Page 225

Page 226

4 Eilean Dhiura is re-deployed to the Cuan /
Luing route (and associated slipway
upgrades on the route).
Capable of refuse collection, HGV and
capacity increase from c.15t to c.40t.
Due to life extension on Belnahua (2024) and
Eilean Dhiura (2022) service expects to
make savings by utilising Belnahua as relief
vessel (for Dry dock) etc.
Match funding Opportunities/External Funding 
Achieved 2023-24 Opportunities 2024-25
Service Development   Islands Programme application for
funding for Port Askaig crew
accommodation and concept design for
ferry. This was ultimately unsuccessful
(Nov 24).
Potential ex-SPT funds via HITRANS to
fund aspects of Jura and Luing services.
Strategic Change  UK levelling Up Fund 
Links to relevant strategies: Islands Connectivity Plan 
Page 226

Page 227

PRIORITY INVESTMENT PLAN – ASSET GROUP 6 SUMMARY 
Asset Group Transport Infrastructure: Airports 3rd Tier
Managers
Moya Ingram 
Description of
Asset Group
and Condition
Assessment 
Asset Group
Airports  
CONDITION
Green Yellow Amber Red
Oban, Coll and Colonsay airports. Oban runway
length 1200m, Coll and Colonsay runway lengths
500m. Both Coll and Colonsay have a small terminal
facility comprising of office, waiting area and integral
garage. Oban airport has a larger terminal building
comprising of office, crew commander room, meeting
room, waiting area, drying area and integral double
garage. Oban airport also has a tower from which a
Flight Information Service is offered. The facilities and
runways are now circa 15 years old. 
75% 10% 10% 5% 
Investment  Funding
Funding source  Current Year Anticipated Investment (£m)
2024-25 (£m) 2025-26 2026-27 2027-28
Airports
Crown Estates 0.000 0.000 0.000 0.000
Regulators
Pioneer Fund 0.000 0.000 0.000 0.000
Rural Growth
Deal 0.000 0.000 0.000 0.000 
2024-25 Overview
Investment Strategy
Technical condition surveys, runway inspections and regulator audits inform condition assessments.
Priorities are determined by investment boards and national strategies like the Islands Connectivity Plan. 
Previous Airport Risks
1. Risk for unknown maintenance failure due to inclement weather e.g. fence damage, sign damage and
flooding. (The perimeter fence at Colonsay has been identified as failed and is no longer stock proof, animal
fouling has been noted within the airfield boundary.) Status – undertaken.
2. CAA audit inspections findings are unknown and will require to be addressed Argyll and Bute Council
operate three licensed aerodromes at Oban, Coll and Colonsay. These aerodromes are licensed by the Civil
Aviation Authority as required by law to allow scheduled passenger flight services (for use by paying
members of the public) to land and take off. The licence stipulates the required safety standards and fire
cover required for each aircraft movement. Operations at the licensed aerodromes are audited on a regular
basis by the CAA and require the appropriate level of resource. 
(The foam dispensers at Oban Airport have been identified as not running to the correct pressure deeming
them non-compliant with regulations. These require to de sent to manufacturer for
recalibration/replacement) Status – undertaken.
3. The spare island fire appliance is no longer operational and cannot be repaired. In the event of the main
appliance failing this will result in airport operations having to cease for a significant length of time due to
lack of fire cover until repairs can be undertaken. Status – undertaken.
Several other operational requirements will require future funding.
 Oban Airport Visual Control Room (VCR) equipment replacement – circa £50k
 Surfacing access road to Colonsay Airport - £250k
 Removing vegetation limiting line of site from Oban Airfield Control Tower -£10k
 Replacement of white linings/markings at 3 airports
 Clearing of Drainage at Coll Airfield
 Training revalidation of Full/Part time/Relief staff - £60k
 Replacement of grass cutting equipment and add-ons Oban Airfield - £35k
Page 227

Page 228

 Operational Radio Replacement at Coll and Colonsay Airport 
Summary of Planned 2024-2025 investment
Investment Strategy at funding levels indicated above
Top service priorities alongside the Capital Plan
Airport Service and supporting Infrastructure Priorities 
Airport Service Priority Cost (£) Are costs
indicative
or
calculated)
Estimated
funding
shortfall
Asset
category
(asset
sustainability,
service
development,
strategic
change)
1. Upcoming Costs Oban
Resurfacing Echo and Foxtrot Taxiway £28,765.19
Resurface Golf Taxiway £56, 280.28
Control Tower Equipment Ageing £50k+
PPE £5k
FODBoss equipment £ unknown
£150k Indicative £150k 
2. Upcoming Costs Colonsay
Runway line painting £4k
Fire fighter PPE £10k
Replacement of MET Equipment £2,500
£16,500k Indicative £16,500k 
3. Upcoming Costs Coll
Runway line painting £4k
Fire fighter PPE £10k 
£14k Indicative £14k 
4. Staff Training Costs £30k Indicative £30k 
Match funding Opportunities/External Funding 
Achieved 2023-24 Opportunities 2024-25
Asset Sustainability  
Service Development   
Strategic Change  UK Levelling Up Fund/Islands Connectivity
Funding 
Links to relevant strategies: Islands Connectivity Plan 
Page 228