BUDGETING PACK 2026/27 
1. INTRODUCTORY REPORT AND RECOMMENDATIONS FOR BUDGET PAPERS
(Pages 3 - 14) 
2. REVENUE BUDGET 
(a) Revenue Budget Overview 2026-27 to 2030-31 (Pages 15 - 94)  
(b) Revenue Budget 2026-27 - Fees and Charges (Pages 95 - 140)  
(c) Financial Risks Analysis 2026-27 (Pages 141 - 152)  
(d) Reserves and Balances - Updated for Budget Pack 2026-27 (Pages 153 - 172) 
3. CAPITAL PLAN 
(a) Review of Capital Arrangements - Update (Pages 173 - 186)  
(b) Capital Plan Update 2026-28 (Pages 187 - 204) 
Public Document Pack

Page 2

This page is intentionally left blank

Page 3

ARGYLL AND BUTE COUNCIL COUNCIL
FINANCIAL SERVICES 25 FEBRUARY 2026
INTRODUCTORY REPORT AND RECOMMENDATIONS FOR BUDGET PAPERS 
1.  EXECUTIVE SUMMARY 
1.1 This report introduces the full package of papers included in the budget packs in
relation to the revenue and capital budgets 
REVENUE PACK 
Revenue Budget Overview 
1.2 This report summarises the overall revenue budget position covering funding,
expenditure and savings.  It also sets out the assumptions and proposals around
non-pay inflation and the cost and demand pressures for inclusion in the revenue
budget. 
1.3  The Scottish Budget was announced by the Cabinet Secretary for Finance and
Local Government on 13 January 2026 and on the same day Scottish Government
Local Government Finance Circular 1/2026 was published and provides detail of
the provisional total revenue and capital funding allocations for 2026-27.  The
Council’s provisional General Revenue Grant is £271.004m in addition to Revenue
Specific Grant of £2.932m.       
1.4 Following the publication of Finance Circular 01/2026 there has been some
changes to distributions in addition to previously non-distributed funding now
having an agreed distribution methodology.  These changes will not be confirmed
until the Finance Order is approved at the end of February 2026, but I have
reflected what I consider to be a reasonable estimate of the changes that are
expected.  In addition, there are two elements of funding still to have distribution
agreed; Scottish Disability Assistance, our share is assumed to be £0.035m as per
previous year and Personal Nursing Care, our share is assumed to be £0.153m
based on assumed GAE allocation.  This increases the General Revenue Grant for
2026-27 to £273.050m.  The specific grants have changed to £2.946m.   
1.5 The Council Tax budget for 2025-26 was set at £70.204m.  Growth has reverted
back to 0.5% in 2026-27 after a temporary increase to 0.75% in 2025-26 to rebase
the position following a review undertaken by the Assessor at Dunbartonshire and
Argyll and Bute Valuation Joint Board. The 0.5% increase in 2026-27 amounts to
£0.353m.    
1.6 The budget for 2025-26 has been rolled forward into 2026-27 and the main changes
to the 2026-27 base budget are summarised below: 
Page 3 Agenda Item 1

Page 4

 Funding for ferries now recurring within the General Revenue Grant as
opposed to a Specific Grant £2.810m.
 Increase to the Loans Fund debt charges of £0.095m.
 Removal of one-off Policy savings in 2025-26 of £0.020m.
 Settlement Commitments (Council Services) of £0.310m. 
1.7 Other increases to the budget are summarised below: 
 Employee cost changes of £16.833m.   This relates to estimated pay
inflation, increments, employee base changes, increase to standby rates
and the re-instatement of employer’s super annuation rate.  
 Unavoidable/inescapable inflation of £2.489m.  This includes utilities,
residential schools, contract inflation and insurances.
 A number of cost and demand pressures amounting to £4.496m.  The most
significant being compliance with BMW Ban £1.568m, Residential Schools
£0.600m, Bus Transport Contract £0.400m, Harbours Repairs and
Maintenance £0.260m, Valuation Joint Board £0.255m and ASN Support
£0.208m.   
1.8 Included within the cost and demand pressures and inflation are amounts relating
to School clothing grants of £0.056m and £0.009m respectively. The Scottish
Government has shown a commitment to supporting families with school clothing
grants, particularly those on qualifying benefits. Originally the amount of the grant
was set at £120 for primary school children and £150 for secondary school pupils
payable once per academic year. Within the 2026-27 budget settlement the
Scottish Government provided £0.700m additional funding Scotland wide towards
the School Clothing Grants of which Argyll and Bute Council’s share was £0.004m.
This was provided as part of the Scottish Governments commitment to provide
funding to allow the grants to rise in line with inflation albeit Local Authorities
retained the flexibility as to whether to apply any increase as long as the minimum
grant levels of £120 and £150 were paid. The additional funding included within the
cost pressures and inflation, if approved by Members, would allow the grant
awards to increase by 6% to £127.20 for primary school children and £159 for
secondary school pupils which would reflect the fact that no inflation has been
applied since implementation in 2021-22. 
1.9 The revised payment to the Health and Social Care Partnership, reflects 2025-26 in
year adjustments and the net changes to the settlement in respect of Social Work
that we have been directed to pass over to the Health and Social Care Partnership. 
Due to the significant financial pressure that the Health and Social Care
Partnership is facing as a result of demand for services, workforce shortages and
the increasing complexity of care are pushing costs upward at a pace that exceeds
available funding it is recommended that Council consider passing over a further
increase to the HSCP.  The most recent budget outlook for 2026-27 for Social
Work forecasts a £6.6m gap between the expected cost of delivering the current
level of service and the resources available to support Social Work and Social Care
services. Savings and Reserves of £3.714m have been identified leaving a budget
gap of £2.872m which Members may wish to consider funding.  The revised
payment amounts to £91.827m. 
Page 4

Page 5

1.10 There are a number of measures to balance the budget that have been agreed at
previous Council budget meetings which have a net effect of reducing the 2026-27
budget gap by £1.107m.   
1.11 There are a number of other measures to balance the budget as follows: 
 General inflationary increase of 6% to fees and charges resulting in
£0.440m of additional income. 
 New management/operational savings amounting to £3.091m, endorsed by
Council on 26 November 2025.
 New policy options savings amounting to £2.999m.
 Underspend in the 2025-26 Loans Fund of £1.500m. 
1.12 The budget gap after the measures to balance the budget is a deficit of £0.703m in
2026-27.   
1.13 The setting of Council Tax should happen on the same day as the Council sets its
revenue budget as once all proposals are considered, Council Tax is the balancing
figure.  The gap outlined in paragraph 1.11 above is based on a 5% Council Tax
increase (this is the assumption that has been in the budget outlook during the
year).   In order to get to a balanced budget, Council will need to increase Council
Tax to 6%.   The alternative to increasing Council Tax further is that Council would
need to fund the gap using reserves or other funds held, which would be a one-off
fix, however, Members need to be mindful of the significant gap in future years as
well as the pressures facing the capital plan.   
1.14 The budget gap over the period 2027-28 to 2030-31 across each scenario is
summarised in the table below.   
Budget Gap 2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
Total
£000
Best Case (3,384) (507) (846) (979) (5,714)
Mid-Range (11,044) (5,775) (6,361) (6,731) (29,911)
Worst Case (21,747) (11,783) (12,653) (13,326) (59,509) 
1.15 It is proposed to establish a Programme Management Office (PMO) responsible for
co-ordination and delivery of both capital and transformation projects, to address
issues including:
 Insufficient capacity to progress transformational change and maintain business
as usual.
 Scale and complexity of organisational change that requires a more consistent,
corporate and disciplined approach to programme and project management.
 Ensuring the Council can deliver its strategic priorities, respond effectively to
external audit scrutiny and build the foundations for sustainable multi-year
transformation.
 Addressing recent external audit findings and best practice evidence identified
by the Accounts Commission. 
Page 5

Page 6

1.16 Two options have been presented for consideration by Council and it is estimated
that either option will require a drawdown of up to £0.600m over a two-year period,
to be funded from the Strathclyde Pension Fund gain monies that were set aside to
support transformation and spend-to-save initiatives by Council at the February 2024
budget meeting. 
1.17  A number of funding requests have been received and Members are asked to give
consideration to these requests and how they would be funded.   
Fees and Charges 
1.18 This report sets out proposals for increases in fees and charges and the resulting
impact on income included in the revenue budget. 
1.19 The general increase to fees and charges is proposed at 6% for 2026-27 and is
expected to generate additional income of £0.440m. 
1.20 The changes proposed to the Social Work fees and charges are noted within the
report and have been the subject of a report to the Integrated Joint Board on 28
January 2026. 
1.21 The increase to Harbour Fees is proposed at 8%. This 8% increase is ring fenced
to fund asset improvement and sustainability within the piers and harbours. This is
estimated to generate additional income of £0.748m. No general inflationary
increase has been proposed for piers and harbours dues to ensure that the service
is cost neutral. 
1.22 New fees and charges which are being introduced for 2026-27 are summarised
below:
 Early Years Charges – non-statutory provision 
o under 2 years old
o 2 to 3 years old
  Kerbstone full inscription flat rate
o Previously was charged per letter
 Cremation Services introduction of music, slideshows, tributes etc
o Detailed line by line in section 4.1 of the Fees and Charges report
 Charges for staff transporting cycles and e-cycles on/off Lismore Ferry
o Includes safely securing them onboard 
Financial Risks Analysis 2026-27 
1.23 This report set out the risks identified as part of preparing the revenue budget and
makes an assessment of the potential financial impact of these.  The financial risks
are monitored routinely throughout the year and actions put in place to mitigate
risks. 
1.24 There are currently 6 council wide revenue risks identified for 2026-27, with a
potential annual value totalling £7.1m, and with varying degrees of likelihood. 
Page 6

Page 7

Description  Likelihood
Assessed
Financial
Impact
£m
Unbudgeted Severe Weather costs 4 3.0
Energy costs increase by 5% greater than
budgeted
3 0.4
IJB refer to Council for additional funding to
deliver social work services 
3 2.0
1% variation in Council Tax Income 2 0.8
10% shortfall on Savings delivery 2 0.6
10% variation on General Inflation 3 0.3
Total  7.1 
1.25 There are currently 30 departmental risks, with a potential annual value totalling
£4.557m, of which 5 are categorised as ‘Likely’.   
Reserves and Balances
1.26 This report summarises the reserves and balances, sets out an analysis of risk
around the adequacy of reserves and balances and proposes a level of
contingency to be held in the General Fund Reserve.   
1.27 At 31 March 2025 the Council had a total of £121.235m usable reserves.  Of this: 
 £3.608m related to the Repairs and Renewals Fund;
 £3.358m related to Capital Funds;
 £1.564m Capital Grants Unapplied; and
 £112.705m was held in the General Fund with £105.162m of this balance
earmarked for specific purposes. 
1.28 The Council’s General Fund contingency remains at 2% of net expenditure.  This
monetary level has been adjusted to take account of the revised net revenue
expenditure proposed for 2026-27.  The revised contingency of 2% of net
expenditure amounts to £7.174m.     
1.29 The estimated unallocated General Fund at the end of the financial year is a
surplus over contingency of £0.481m, however, this is an estimated position and
subject to change. 
CAPITAL PACK 
Review of Capital Arrangements - Update
1.30 As part of the 2025-26 budget process, the Capital Plan 2025-28 Summary Report
set out opportunities for improvements to current capital arrangements.  As such, it
was agreed that a review of existing capital arrangements would be progressed
Page 7

Page 8

during 2025-26. This report provides a progress update, with recommendations
brought forward based on the outcomes of review elements completed to date; and to
outline the interim approach to capital for the 2026-27 budget process, pending the
outcome of the wider review. 
1.31 This report concludes that: 
 An interim approach to capital planning is required for the 2026-27 budget
process, pending the outcome of the wider review of capital arrangements;
 There are opportunities to take a more corporate and strategic approach to
property maintenance, repairs and renewals from 2026-27, supporting long-
term service and financial sustainability;
 Work has been undertaken to develop integrated financial modelling and to
improve governance reporting.  This has helped inform the capacity within
existing resources for new capital investment;
 The Section 95 Officer requires to take a strategic approach and exercise
flexibility within the capital funding framework, including the use of
earmarked reserves, in order to manage the impact of investment decisions
on the annual revenue budget and in the context of safeguarding the
council’s longer term financial sustainability;
 Preliminary high level financial modelling has been undertaken to inform the
capacity within the existing debt charges budget and available reserve
balances for future capital investment.  Whilst this is a complex picture with
several variables, there is considered capacity within available resources to
fund additional capital investment over the short to medium term.  This
position will require to be monitored and kept under review on an ongoing
basis; and
 It has not been possible to progress all aspects of the review during 2025-26,
with a number of the original requirements not yet delivered.  It is anticipated
that these outstanding opportunities for improvement will be progressed during
2026-27, subject to available resources.   
Capital Plan Update 2026-28
1.32 A separate Review of Capital Arrangements Update report has been provided, as
part of the 2026-27 Budget Pack, setting out the interim approach to capital
planning for the 2026-27 budget process, pending the outcome of the wider review. 
This report outlines proposals for the required update for the remaining 2 years of
the current Capital Plan, 2026-28. 
1.33 The Local Government Finance Settlement Circular 1/2026 provided 2026-27
General Capital Grant of £9.975m, excluding effectively ring-fenced or directed
funding of £6.099m.  This represents £0.309m more than previous planning
assumptions for each of the years 2026-27 and 2027-28.  In addition, the 2025-26
final General Capital Grant settlement was £0.007m higher than assumed within
the approved Capital Plan.   
1.34 The ring-fenced or directed funding of £6.099m, included within the 2026-27
General Capital Grant, comprises £0.379m for Flooding, £0.270m for Nature
Restoration and £5.450m for Island Connectivity.  The Scottish Government has
Page 8

Page 9

confirmed additional capital funding of £19.700m in total over the next 2 years
(£5.450m 2026-27 and £14.250m 2027-28) to support investment in a new Jura
Ferry (£12.000m) and Ferry Slips (£7.700m).  This brings the total of notified ring-
fenced or directed funding being made available through the General Capital Grant
to £20.349m over 2026-28. In addition, as agreed in February 2025, an allocation
from the General Capital Grant to Private Sector Housing Grant (PSHG) is
provided for at £0.820m in 2026-27 and £0.819m in 2027-28 
1.35 The settlement also provides for additional capital grant funding of £20m across
Scotland in 2026-27 for Climate Emergency, to be included within the General
Capital Grant, assumed to be non-recurring.  Given that project planning across the
programme will already take cognisance of climate change, as a key consideration,
it has not been necessary to augment planned project expenditure in this respect. 
As such, the authority’s share of this funding, estimated at £0.482m, represents
additional available resources for 2026-27.  This gives an overall net increase of
£1.107m in available General Capital Grant funding over the remaining 2 years of
the current Capital Plan, 2026-28.   
1.36 The current approved Capital Plan 2025-28 includes an updated asset sales target
totalling £2.025m over these 3 years.  A total of £1.500m is currently estimated to
be achieved in 2025-26, with a remaining balance of £0.525m to be achieved over
2026-28.  However, based on an updated assessment undertaken by Commercial
Services on potential sales opportunities that may reasonably be achieved over the
2 years 2026-28, this target has been updated to £2.000m, representing an overall
increase of £1.475m in available funding over the 2 years 2026-28. 
1.37 As at 31 December 2025, there was a forecast overspend of £0.166m on the
current 2025-28 Capital Plan, however, this is expected to be managed within
existing available resources.  No additional spend approvals are being sought in
this respect, at this stage.  However, there are spending requirements totalling
£3.385m, deemed to be essential, either critical to maintain service delivery, or to
comply with legislation or regulation (Red RAG status risks), that cannot be
managed within existing available resources. 
1.38 In addition to the new commitments associated with the ring-fenced or directed
funding provided through the General Capital Grant, new capital commitments in
respect of proposed recharges to capital, totalling £0.604m, require to be provided
for within the Capital Plan, subject to member approval. 
1.39 After taking account of the additional capital resources available from General
Capital Grant and Asset Sales, there is a shortfall of £1.407m in the funding
available to meet new capital commitments.  However, work has been undertaken,
as part of the Review of Capital Arrangements, to establish the capacity within
existing available revenue resources (annual debt charges budget and reserves
earmarked for capital purposes) to support new capital investment.  There is also
an opportunity for this to be further augmented by additional borrowing, with the
revenue consequences, in terms of debt charges, accounted for as part of the
annual revenue budget for 2026-27 and future years.   
Page 9

Page 10

1.40 Additional investment priorities across council services have been identified,
including in respect of the Roads programme for 2026-28, with an estimated
shortfall of £9m each year to maintain the current standard. Council officers have
brought forward investment proposals for members’ consideration, in line with the
overall capacity to support additional capital expenditure, with no forecast impact
on the revenue budget over the short to medium term. 
2. RECOMMENDATIONS  
2.1 It is recommended that the Council: 
a) Approve the revenue estimates for 2026-27 and that consequently the local
tax requirement estimated at £75.103m is funded from Council Tax. 
Approve the following rates and charges for the year, 2026-27: 
1. Council Tax to be paid in respect of a chargeable dwelling in Band “D” of
£1,723.18 representing a 6% increase.
2. Council Tax to be paid in respect of a chargeable dwelling in each of the
other valuation bands in accordance with Section 74(1) of the Local
Government Finance Act 1992 as amended.
3. Business Rates as determined by Scottish Ministers. 
b) Approve the revenue budget for 2026-27 as set out in the revenue budget
overview report. 
c) Approve an increase to School Clothing Grants of 6% from 1 April 2026
resulting in a payment of £127.20 for primary school children and £159 for
secondary school pupils. 
d) Approve a base allocation to the Health and Social Care Partnership of
£91.827m for 2026-27.  Approve indicative base allocations for 2027-28 and
2028-29 of £91.723m.  The level of future years funding is subject to the
level of Scottish Government funding and the Council’s overall financial
position in future years. 
e) Approve that an adjustment will be made to the HSCP payment in relation to
undistributed funding for Scottish Disability Assistance and Free Personal
Nursing Care if the funding received is materially different to the estimate
included within the base allocation.   
f) Approve the policy savings options for 2026-27 as outlined in Appendix 4 of
the revenue budget overview report and agree that any policy savings
relating to 2027-28 onwards will be considered as part of next year’s budget
process, unless it is a full year effect of the 2026-27 saving.   
g) Consider the funding requests received as set out within Appendix 6 of the
Revenue Budget Overview Report. 
Page 10

Page 11

h) Agree that officers will undertake an exercise to review the Service Level
Agreements of Community Pools to ensure parity between agreements. This
will be reported back to Members during 2026-27. 
i) Note the proposal to establish a Programme Management Office (PMO)
responsible for co-ordination and delivery of both capital and transformation
projects and note the drawdown of up to £0.600m over a two-year period
under the current delegation which set aside funding in the General Fund for
transformation/spend to save projects and required that officers provide
reports on the drawdowns from the General Fund balance to be submitted to
the Policy and Resources Committee as part of the monitoring pack.   
j) In agreeing to PMO proposal Option 1, agree to establish an Appointments
Panel for the recruitment to the new post of Head of Transformation; and
nominate 3 elected members and substitutes to the Appointments Panel:
two from the Administration and one from the opposition. 
k) Approve the following in relation to fees and charges with effect from 1 April
2026 unless otherwise noted: 
1. Approve the proposals for the fees and charges inflationary increase of
6% and approve the charges that are over and above inflation.  Note that
this would generate additional income of £0.440m in total.   
2. Approve all other charges as noted within the Fees and Charges
Schedule. 
3. Note that formal Council approval may be required at a later date for
further changes to the Social Work Fees and Charges. 
l) Note the financial risks analysis. 
m) Approve the contingency level for the General Fund balance at a level of 2%
of net expenditure, equivalent to £7.091m and note the report on reserves
and balances. 
n) Approve the capital plan as set out in Appendix 3 to the Capital Plan report,
noting that this incorporates the red risks (£3.385m) and proposed
recharges to capital (£0.604m). 
o) Note the capacity within available resources to meet new capital investment,
after providing for the funding shortfall of £1.407m on the current Capital
Plan and agree how these available resources are directed.       
p) Endorse the approach to capital for the 2026-27 budget process, pending
the outcome of the wider review of capital arrangements. 
q) Endorse the revised corporate approach to the management of property
repairs, maintenance and renewals, and approve the redirection of £8m
reserves earmarked for capital purposes to a new Repairs and Renewals
Fund. 
Page 11

Page 12

r) Agree that the Section 95 Officer will continue to exercise flexibility within
the capital funding framework, including the use of the Strategic Capital
Finance Reserve, in order to manage the impact of capital investment on the
annual revenue budget and support long-term financial sustainability. 
s) Note the Capital Review progress to date and note that further
recommendations arising from the future workplan will be brought back to
members in due course. 
3.  IMPLICATIONS 
3.1 Policy – There are policy implications associated with proposals to balance the
revenue budget as well as the policy options that have been subject to employee
consultation.   
3.2 Financial – The report outlines the revenue budget position over 2026-27 to 2030-
31 and the funding and commitments for the capital plan 2026-28. 
3.3 Legal – Any legal implications have been considered when developing the savings
options required for the revenue budget.   
3.4 HR – Any HR implications have been considered when developing savings options
required for the revenue budget.  Statutory Trade Union consultation has been
carried out. 
3.5 Customer Service – There may be some customer service implications arising from
previously agreed savings options and the new policy options – information is
contained in the savings templates.     
3.6 Risk – There is a separate report assessing financial risks and there is also an
overall assessment of risk included within the separate report on Reserves and
Balances. In respect of the capital programme, there are risks around the level of
capital receipts, ongoing cost increases, grant funding, future pressures and there
are a number of other risks highlighted in the Capital Plan Update report. 
3.7 Climate Change – The Council is committed to addressing climate change and
reviews of how Services are delivered is ongoing within the available budget
resources. 
3.8 Fairer Scotland Duty – Integrated Impact Assessments have been completed as
required and are available on the Council website. 
3.9 Equalities (protected characteristics) - Integrated Impact Assessments have been
completed as required and are available on the Council website. 
3.10 Consumer Duty - Integrated Impact Assessments have been completed as
required and are available on the Council website. 
Page 12

Page 13

3.11 Island Communities – Integrated Impact Assessments have been completed as
required and are available on the Council website. 
3.12 Children’s Rights and Wellbeing - Integrated Impact Assessments have been
completed as required and are available on the Council website. 
Kirsty Flanagan
Executive Director/Section 95 Officer
11 February 2026 
Councillor Ross Moreland, Policy Lead for Finance and Commercial Services 
For further information please contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk
Page 13

Page 14

This page is intentionally left blank

Page 15

ARGYLL AND BUTE COUNCIL COUNCIL
FINANCIAL SERVICES 25 FEBRUARY 2026
REVENUE BUDGET OVERVIEW 2026-27 to 2030-31  
1. EXECUTIVE SUMMARY  
1.1 This report summarises the position with regard to the key issues
surrounding the revenue budget estimates and setting of council tax for
2026-27.  It also provides budget estimates for 2027-28 to 2030-31;
within the report the mid-range estimates are noted, with the best case
and worse case estimates included in Appendix 1. 
1.2  The Local Government Finance Circular 01/2026 was published on 13
January 2026 and provides detail of the provisional total revenue and
capital funding allocations for 2026-27.  The Council’s provisional
General Revenue Grant is £271.004m in addition to Revenue Specific
Grant of £2.932m.       
1.3 Following the publication of Finance Circular 01/2026 there has been
some changes to distributions in addition to previously non-distributed
funding now having an agreed distribution methodology.  These changes
will not be confirmed until the Finance Order is approved at the end of
February 2026, but I have reflected what I consider to be a reasonable
estimate of the changes that are expected.  In addition, there are two
elements of funding still to have distribution agreed; Scottish Disability
Assistance, our share is assumed to be £0.035m as per previous year
and Personal Nursing Care, our share is assumed to be £0.153m based
on assumed GAE allocation.  This increases the General Revenue Grant
for 2026-27 to £273.050m.  The specific grants have changed to
£2.946m.   
1.4 Other funding to be accounted for is:
 A further reduction to the Level Playing Field Support from 2027-28
which is not part of the floor mechanism
 Funding in respect of  Packaging Extended Producer Responsibility
(pEPR).   Funding for 2026-27 has been advised and there is a carry
forward from previous years of unallocated pEPR funding.  A prudent
assumption in the mid-range scenario has been reflected from 2027-
28 onwards.   
1.5 The Council Tax budget for 2025-26 was set at £70.204m.  Growth has
reverted back to 0.5% in 2026-27 after a temporary increase to 0.75% in
2025-26 to rebase the position following a review undertaken by the
Assessor at Dunbartonshire and Argyll and Bute Valuation Joint Board
which increased the budget by £0.300m.  Future years growth has been
assumed as 0.25% in the worst case scenario, 0.5% in the mid-range
scenario and 0.75% in the best case scenario.   The 0.5% growth in
2026-27 amounts to an estimated increase of £0.353m.   
Page 15 Agenda Item 2a

Page 16

1.6 The budget for 2025-26 has been rolled forward into 2026-27 and the
main changes to the 2026-27 base budget are summarised below: 
 Funding for ferries now recurring within the General Revenue
Grant as opposed to a Specific Grant £2.810m.
 Increase to the Loans Fund debt charges of £0.095m.
 Removal of one-off Policy savings in 2025-26 of £0.020m.
 Settlement Commitments (Council Services) of £0.310m. 
1.7 The employee cost changes amount to £16.833m.  This relates to
estimated pay inflation, increments, employee base changes, increase
to standby rates and the re-instatement of employer’s superannuation
rate.   
1.8 Only unavoidable/inescapable inflation has been included within 2026-
27 and this amounts to £2.489m.  This includes utilities, residential
schools, contract inflation and insurances. 
1.9 There are a number of cost and demand pressures for 2026-27,
amounting to £4.496m summarised as follows:  
 ASN Support - £0.208m
 School Clothing Grants - £0.056m
 Residential Schools - £0.600m 
 Waste Uplifts provided externally - £0.060m
 IT Licences for Education - £0.140m
 Freedom of Information (FOI) Requests - £0.198m
 Planning (Local Development Plan) - £0.050m
 Housing Benefits Administration Grant - £0.040m
 Payroll and Pensions Team Resource - £0.155m
 Microsoft 365 Licences - £0.030m
 Compliance with BMW Ban - £1.568m
 Bus Transport Contracts - £0.400m
 Minimum Income Standards (MIS) Research - £0.030m
 Valuation Joint Board - £0.255m
 Security Operations Centre - Quorum Cyber Contract Renewal -
£0.043m
 Wi-Fi Network Subscription License Costs - £0.015m
 Civica Housing Case Management System - £0.032m
 Right sizing of budgets within Customer Support Services - £0.057m.
 Management of Council Dams - £0.095m
 Harbours Repairs and Maintenance - £0.260m
 Resurfacing of Taxiways at Oban Airport - £0.100m
 Flexible Food and Fuel Fund - £0.104m 
1.10 The revised payment to the Health and Social Care Partnership, reflects
2025-26 in year adjustments and the net changes to the settlement in
respect of Social Work that we have been directed to pass over to the
Page 16

Page 17

Health and Social Care Partnership. Health and Social Care
Partnerships in Scotland continue to face significant financial pressures. 
Rising demand for services, workforce shortages and the increasing
complexity of care are pushing costs upward at a pace that exceeds
available funding.  At the same time, inflationary pressures and the need
to maintain safe staffing levels are stretching already constrained
budgets.  Our HSCP is no different to those across Scotland and will
require to make difficult decisions about service prioritisations,
transformation and efficiency savings to ensure long-term sustainability.  
The most recent budget outlook for 2026-27 for Social Work forecasts a
£6.6m gap between the expected cost of delivering the current level of
service and the resources available to support Social Work and Social
Care services. Savings and Reserves of £3.714m have been identified
leaving a budget gap of £2.872m which Members may wish to consider
funding. 
1.11 The budget gap prior to any measures to balance the budget is a deficit
of £13.383m in 2026-27. 
1.12 There are a number of measures to balance the budget that have been
agreed at previous Council budget meetings which have a net effect of
reducing the 2026-27 budget gap by £1.107m. 
1.13 There are a number of other measures to balance the budget as follows: 
 General inflationary increase of 6% to fees and charges resulting
in £0.440m of additional income. 
 New management/operational savings amounting to £3.091m,
endorsed by Council on 26 November 2025.
 New policy options savings amounting to £2.999m.
 Underspend in the 2025-26 Loans Fund of £1.500m. 
1.14 The budget gap after the measures to balance the budget is a deficit of
£0.703m in 2026-27.   
1.15 The setting of Council Tax should happen on the same day as the
Council sets its revenue budget as once all proposals are considered,
Council Tax is the balancing figure.  The gap outlined in paragraph 1.14
above is based on a 5% Council Tax increase (this is the assumption
that has been in the budget outlook during the year).   In order to get to a
balanced budget, Council will need to increase Council Tax by 6%.   The
alternative to increasing Council Tax further is that Council would need
to fund the gap using reserves or other funds held, which would be a
one-off fix, however, Members need to be mindful of the significant gap
in future years as well as the pressures facing the capital plan. 
1.16 The budget gap over the period 2027-28 to 2030-31 across each
scenario is summarised in the table below.   
Page 17

Page 18

Budget Gap 2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
Total
£000
Best Case (3,384) (507) (846) (979) (5,714)
Mid-Range (11,044) (5,775) (6,361) (6,731) (29,911)
Worst Case (21,747) (11,783) (12,653) (13,326) (59,509) 
1.17 It is proposed to establish a Programme Management Office (PMO)
responsible for co-ordination and delivery of both capital and
transformation projects, to address issues including:
 Insufficient capacity to progress transformational change and
maintain business as usual.
 Scale and complexity of organisational change that requires a more
consistent, corporate and disciplined approach to programme and
project management.
 Ensuring the Council can deliver its strategic priorities, respond
effectively to external audit scrutiny and build the foundations for
sustainable multi-year transformation.
 Addressing recent external audit findings (see below) and best
practice evidence identified by the Accounts Commission. 
1.18 Two options have been presented for consideration by Council and it is
estimated that either option will require a drawdown of up to £0.600m
over a two-year period, to be funded from the Strathclyde Pension Fund
gain monies that were set aside to support transformation and spend-to-
save initiatives by Council at the February 2024 budget meeting. 
1.19 The Council are asked to consider funding requests summarised within
Appendix 6.  Members are asked to give consideration to these requests
and how they would be funded.   
Page 18

Page 19

ARGYLL AND BUTE COUNCIL COUNCIL
FINANCIAL SERVICES 25 FEBRUARY 2026
REVENUE BUDGET OVERVIEW 2026-27 to 2030-31  
2. INTRODUCTION 
2.1 This report summarises the position with regard to the key issues
surrounding the revenue budget estimates and setting of council tax for
2026-27.  It also provides budget estimates for 2027-28 to 2030-31;
within the report the mid-range estimates are noted, with the best case
and worse case estimates included in Appendix 1. 
2.2 Regular reports on the budget outlook 2026-27 to 2030-31 have been
presented to Members throughout the year.  Reports were presented to
the Policy and Resources Committee on 8 May 2025, 21 August 2025,
9 October 2025 and 4 December 2025. 
3. DETAIL 
3.1 Funding 
Finance Settlement 
3.1.1 The Scottish Budget was announced by the Cabinet Secretary for
Finance and Local Government on 13 January 2026 and on the same
day Scottish Government Local Government Finance Circular 1/2026
was published.  The Scottish Budget included multi-year spending
plans, however, the Circular only gives details of the provisional Local
Government settlement (revenue and capital) at Council level for 2026-
27 only.  It is expected that information at Council level for 2027-28 and
2028-29 will be available around the Spring.  The provisional total
funding allocations form the basis for the annual consultation between
the Scottish Government and COSLA ahead of the Local Government
Finance (Scotland) Order 2026 presented to the Scottish Parliament,
currently scheduled for the end of February 2026.   
3.1.2 The circular outlines that the Scottish Government will work in
partnership with local government to implement the budget and the joint
priorities in return for the full funding package worth almost £15.7 billion
and includes:
 A further £773.8m of funding that has now been baselined as
General Revenue Grant, as part of the Scottish Government’s
commitment under the Verity House Agreement to review ring-
fenced funding.
 Additional General Revenue Grant of £253.9m to support local
priorities.
 An additional £3m to support Free School Meals.
Page 19

Page 20

 £160m for adult social care workers in commissioned services.
 An additional £11m to improve pay for early learning and childcare
workers in commissioned services.
 £11m to support development of people working in children’s social
work.
 £7m to support provision of Free Personal and Nursing care.
 £20m to tackle the climate emergency.
 £40m to improve active travel infrastructure. 
 An additional £11.4m resource and £15.5m capital to improve inter-
island connectivity. 
Scottish Government Funding for Argyll and Bute Council 
3.1.3 The General Revenue Grant (GRG) for 2025-26 noted within the
February 2025 budget pack was £259.134m.  The General Revenue
Grant for 2026-27 is £271.004m as outlined within Finance Circular
01/2026.  There is also £2.932m of specific grants.   
3.1.4 Following the publication of Finance Circular 01/2026 there has been
some changes to distributions in addition to previously non-distributed
funding now having an agreed distribution methodology.  These
changes will not be confirmed until the Finance Order is approved at the
end of February 2026, but I have reflected what I consider to be a
reasonable estimate of the changes that are expected.  In addition,
there are two elements of funding still to have distribution agreed;
Scottish Disability Assistance, our share is assumed to be £0.035m as
per previous year and Personal Nursing Care, our share is assumed to
be £0.153m based on assumed GAE allocation.  This increases the
General Revenue Grant for 2026-27 to £273.050m.  The specific grants
have changed to £2.946m.   
3.1.5 The table below represents the changes in General Revenue Grant
between 2025-26 and 2026-27: 
£000 £000
Funding Budget 2026-27 as per budget
pack 
259,134
SG Policy Commitments – Health and
Social Care:  
Children’s Social Care Pay Uplift 2025-26 164 
LG Pay 2025-26 361 
Employer’s National Insurance 515 
SRA Kindship Care* 26 
Holiday Activities for Disabled Children* 14 
1,080
SG Policy Commitments – Council:  
School Milk* 15 
Inter Island Connectivity (switch from
specific grant to GRG)
2,810 
No one left behind* 63 
Page 20

Page 21

Prisoner Early Release* 9 
Nature Restoration Fund* 84 
Employer’s National Insurance 2,057 
Island Cost of Living* 145 
Ukraine and Others, resettlement* 92 
Single Use Vapes* 4 
Adopt and Adapt Funding* 69 
DHP Housing Emergency* 12 
DHP Top Up* 13 
RRTP Top Up* 20 
LA Pay 1,061 
Teacher Induction* 23 
Scottish Welfare Fund* 71 
Invest to Save* 300 
Teachers Pay 459 
7,307
Rounding   (4)
Updated Funding 2025-26 (FC 1/2026)  267,517
Updating of Indicators   (7,962)
Change to the floor  5,719
Changes Row  4,728
One-off funding Removed*  (960)
Indicators Still to be distributed  (35)
SG Policy Commitments – Health and
Social Care 
3,128
SG Policy Commitments – Council  446
Teachers Pay – Full year effect 2026-27  281
Estimated Settlement 2026-27  272,862
Undistributed Funding for Scottish
Disability Assistance (assume same as
last year) 
35
Undistributed Funding for Free Personal
and Nursing Care (assume based on GAE
distribution) 
153
Total Estimated Settlement 2026-27  273,050 
*One-off funding 
3.1.6 If you compare the estimated settlement of £273.050m to the finalised
cash funding in 2025-26 the funding has increased by £5.533m – in
cash terms.  However, this is not a like-for-like comparison as there is
some funding in 2025-26 that was one-off, funding in 2026-27 which is a
full year effect of a decision in 2025-26 and funding in 2026-27 that is
new.   The like-for-like cash terms comparison is an increase of
£6.059m or 2.3%   
£000 £000
2025-26 Settlement 267,517 
One-off funding removed (960) 
2025-26 Settlement for comparison  266,557
2026-27 Settlement 273,050 
Page 21

Page 22

Less Teachers Pay Full Year Effect (281) 
Less Free Personal and Nursing Care
Increase
(153) 
2026-27 Settlement for comparison  272,616
Increase  6,059
Increase %  2.3% 
3.1.7 Although there has been a cash increase, an element of the increase is
due to additional funding to support Scottish Government Policy. 
Adjusting for these amounts (£3.128m & £0.446m) the increase reduces
to £2.485m or 0.9% for core services.       
3.1.8 In considering the assumption related to future years funding, the
Scottish Spending Review published alongside the Scottish Budget
suggests limited real-terms growth, effectively a very tight or flat cash
outlook for the Finance and Local Government portfolio.  It is expected
that detailed estimates at Local Authority level will be available in the
Spring and at which point I will further review the our assumptions. 
Meantime, and as a result of Argyll and Bute Council receiving benefit
from the floor mechanism, I recommend that we assume a 0.5%
reduction in Scottish Government funding in the mid-range scenario
which reflects flat cash and the floor being set at 0.5% below the
Scottish average.   The best and worst case scenarios would be varied
by 0.50% resulting in range of between 1% reduction (worst case) and
flat cash (best case).   
Level Playing Field Support 
3.1.9 Level Playing Field support for PPP projects was introduced many years
ago to ensure that a local authority’s choice between using a PPP model
and conventional public procurement was not distorted simply by the 
difference in how loan costs are supported by the Scottish Government. 
Argyll and Bute Council receive Level Playing Field Support from the
Scottish Government for the Waste PPP Contract that comes to an end
during 2026.  The Level Playing Field Support reduced in 2026-27 (part
year) and there will be a further reduction of £0.430m in 2027-28 that is
outwith the floor mechanism.  The estimated Revenue Support Grant has
been adjusted to account for this reduction in 2027-28 and beyond. 
Extended Producer Responsibility (EPR) – Funding from DEFRA 
3.1.10 As part of the 2025-26 budget process, £2.499m of the estimated 2025-
26 funding available in respect of Packaging Extended Producer
Responsibility (pEPR) from the Department of Environment, Food and
Rural Affairs (DEFRA) was carried forward into 2026-27.  As previously
reported, the funding allocation for 2025-26 has been confirmed at
£2.786m, £1.061m less than the original estimate provided by DEFRA
of £3.847m, reducing the carry forward into 2026-27 to £1.438m.  The
funding for 2026-27 has been confirmed at £2.851m.  It remains
uncertain as to whether this funding will be recurring at this level in
2027-28 and future years, and without a reduction in Scottish
Page 22

Page 23

Government grant.  At this stage, funding is assumed to continue into
2027-28 and future years at the 2026-27 level in the best case, at 50%
of the 2026-27 level in the mid-range and £nil in the worst case
scenarios.  Funding conditions and future years budget pressures, in
respect of potential new spending commitment remain unclear. 
Council Tax 
3.1.11 The Council Tax base for 2025-26 was set at £70.204m which reflected
a 9.9% inflationary increase as agreed by the Council on 27 February
2025. This is the starting position for 2026-27.   
3.1.12 The 2024-25 final outturn included additional income of £1.234m in
respect of 2024-25 and prior years, an element of which was expected
to be recurring in 2025-26 and future years.  A significant element of this
additional income (some £0.5m) related to the reclassification of self-
catering units as domestic dwellings by the Assessor, following
completion of both the 2022-23 and 2023-24 canvasses during the year,
which saw the transfer of properties from the Non-domestic Rates to
Council Tax registers.  There is a significant level of uncertainty in
respect of the regulatory environment in this respect, with a risk of
appeals being granted and properties returning to Non-domestic Rates. 
This uncertainty in respect of both timing and financial value, presents a
risk to financial planning assumptions.  At this stage, a re-base of the
current Council Tax budget, estimated at £0.150m in the worst case,
£0.300m in the mid-range and £0.450m in the best case scenarios, has
been assumed within the Budget Outlook. 
3.1.13 In terms of Council tax growth, throughout the year a growth of 0.5%
has been assumed within the mid-range scenario (0.25% in worst case
and 0.75% in best case). The 0.5% growth in 2026-27 amounts to an
estimated increase of £0.353m. The growth in future years remains the
same as 2026-27 in all scenarios. 
3.1.14 The estimated Council Tax income over the next five years (excluding
future years Council Tax increases, which are dealt with later in the
report) is noted in the table below. 
Draft
2026-27
£000
Mid-
Range
2027-28
£000
Mid-
Range
2028-29
£000
Mid-
Range
2029-30
£000
Mid-
Range
2030-31
£000
Council Tax
Base
70,204 70,204 70,204 70,204 70,204
Council Tax
Re-Base
2025-26
300 300 300 300 300
Council Tax
Growth
353 707 1,063 1,421 1,781
Page 23

Page 24

Total
Council Tax
Income 
70,857 71,211 71,567 71,925 72,285 
General Fund 
3.1.15 An earmarked reserve of £1.3m was previously set aside for employee
pay increases beyond budget. £0.039m of this was drawn down in 2025-
26 leaving £1.261m available in 2026-27 to be used to offset pay award
costs. 
3.1.16 As reported in the budget pack in February 2024, reduced employer
contribution rates payable to Strathclyde Pension Fund will result in
one-off savings in 2024-25 and 2025-26. It was agreed that £2m of the
pension fund gain would be released each year for a period of 3 years
(2024-25 through to 2026-27) in order to help bridge the budget gap. 
Total Funding 
3.1.17 The table below summarises the total estimated funding over the next
five years within the mid-range scenario.   
Draft
2026-27
£000
Mid-
Range
2027-28
£000
Mid-
Range
2028-29
£000
Mid-
Range
2029-30
£000
Mid-
Range
2030-31
£000
Estimated
Scottish
Government
Funding
273,050 271,686 270,328 268,976 267,631
Reduction to
Level Playing
Field Support
Funding
0 (430) (430) (430) (430)
Extended
Producer
Responsibility
(EPR)
Indicative
Funding
2,851 1,426 1,426 1,426 1,426
Previously
Earmarked
EPR funding
for future
pressures
1,438 0 0 0 0
Council Tax
income
70,857 71,211 71,567 71,925 72,285
Previously
Earmarked
1,261 0 0 0 0
Page 24

Page 25

Reserve for
Pay Awards
Released
Strathclyde
Pension Fund
Gain
2,000 0 0 0 0
Total Funding  351,457 343,893 342,891 341,897 340,912 
3.2  Base Budget
3.2.1 As with previous years the base budget for 2026-27 is the current years
approved budget adjusted for any:
 one-off items included within 2025-26 that are not carried forward
into 2026-27;
 previously agreed items for future years; and
 other adjustments since the 2025-26 budget was agreed. 
3.2.2  The SJC and Chief Officers pay awards of 4% for 2025-26 and 3.5% in
2026-27 have been accounted for.  The Teachers have agreed a
revised pay offer of 4% from 1 August 2025, rising to 4.25% from 1 April
2026 with a further 3.25% from 1 August 2026 to 31 July 2027.   
3.2.3 Although the majority of the funding from the Scottish Government is not
strictly ring-fenced, there are elements of the funding that are directed to
deliver on Scottish Government policy.   The base budget needs to be
adjusted to reflect the additional costs for delivering on these directions
and the budget increase is limited to the funding provided. The
adjustments for the Council are listed in the table below and it should be
noted that any relating to the HSCP are detailed at section 3.6 of the
report. 
Increase /
(Decrease)
£000
Real Living Wage for Commissioned Providers – Early
Learning and Childcare
158
School Clothing Grant Inflation 4
Ferries (this increase has been limited to £27k rather than
£163k as the remainder is already included in pay and
other inflation lines)
27
Scottish Assessors Association 22
Increase to DHP 99
Total Settlement Commitments 310 
3.2.4 The revised base budget is noted in the table below.   
Page 25

Page 26

Draft
2026-27
£000
Mid-
Range
2027-28
£000
Mid-
Range
2028-29
£000
Mid-
Range
2029-30
£000
Mid-
Range
2030-31
£000
Base Budget 2025-
26
328,289 328,289 328,289 328,289 328,289
Community Sports
Saving in 2025-26 –
funded from
reserves for 1 year
only
(20) (20) (20) (20) (20)
Increase to Loans
Fund debt charges 
95 95 95 95 95
Funding for ferries
now included within
General Revenue
Grant.
2,810 2,810 2,810 2,810 2,810
Settlement
Commitments 
310 310 310 310 310
Revised Base
Budget
331,484 331,484 331,484 331,484 331,484 
3.3 Employee Costs 
Pay Inflation Estimates 
3.3.1 The Public Sector Pay Policy, published alongside the Scottish Budget,
set out a multi-year framework of a 9% pay envelope covering 2025-26,
2026-27 and 2027-28.  This underpinned our original planning
assumption of 3% across each of these years.  However, following
agreement of the SJC and Chief Officers pay award for 2025-26 and
2026-27 at 4% and 3.5% respectively, these assumptions were
subsequently updated. The increase of 3.5% for 2026-27 has been
applied across all scenarios, 3% for 2027-28 in both the best case and
mid-range scenarios, with 5% in the worst case scenario has been
assumed.  For 2028-29 to 2030-31, the best case scenario has been
reduced to 2%, while the mid-range remains at 3% and worst case
remains at 5%. 
3.3.2 The teachers agreed a revised pay offer of 4% from 1 August 2025,
rising to 4.25% from 1 April 2026 with a further 3.25% from 1 August
2026 to 31 July 2027.  This increase has been included within the
budget outlook. 
3.3.3 On 8 January 2026 a Scottish Statutory Instrument (SSI) was laid
before parliament regarding increasing councillors pay by 3.3% with
effect from 1 April 2026. The financial impact of this is an increase of
£0.036m which has been accounted for within the overall pay award
figures. Note that the lead committee has 40 days to consider the SSI
before it will formally pass. 
Page 26

Page 27

Detailed Employee Costing Exercise 
3.3.4 Financial Services have populated salary templates with details of the
current establishment and where necessary liaised with budget holders
to confirm their staff.  The templates calculate the next years pay bill
including superannuation and national insurance contributions.  The
cost of the employees from the template is compared to the previous
year and reasons for differences explained. 
3.3.5 In terms of the level of employee budgets for 2026-27, the expectation
would be that the budget would reflect the 2025-26 budget plus any
increase due to incremental progression, pay inflation and any other
unavoidable employee cost increases less previously approved
employee budget savings.   
Increments 
3.3.6 The cost of employee increments has been updated following the salary
template exercise.  The employee increments for 2026-27 equate to
£0.599m.  For future years it has been assumed that the best case will
be half the previous year cost with mid-range and worst case, equal to
the cost in 2026-27.   
Chief Officers Pay 
3.3.7 In 2021 COSLA and the Association of Local Authority Chief Executive’s
(ALACE) jointly commissioned an independent review of Scottish Local
Authorities Chief Executive’s pay.  Prior to this review, Chief Executive’s
pay had not been fully reviewed since 2001.  COSLA Leaders considered
the findings of the review and recommended a new agreed pay
framework which had consequential impacts on other Chief Officers pay.
The additional cost within 2026-27 relating to Council employees is
£0.129m.       
Standby Rates 
3.3.8 An increase to the current Standby Rate of pay from December 2025
was approved by Council 26 November 2025.  The full year recurring
impact at an estimated additional cost of £38k from 2026-27 has been
incorporated into the budget outlook across all budget scenarios. 
Strathclyde Pension Fund (SPF) 
3.3.9 As detailed in the budget pack presented to Council in February 2024,
the employer contribution rate paid to the Strathclyde Pension Fund
decreased from 19.3% to 6.5% in both 2024-25 and 2025-26 and
thereafter will rise to a sustainable long-term rate of 17.5% from 2026-
27. The reduction in the first 2 years equates to reduced costs of
£6.875m per annum relating to Council employees (excluding HSCP).
From 2026-27 the costs will rise again to 17.5% therefore this increase
is required to be built into projections from 2026-27 onwards. 
Page 27

Page 28

3.3.10 The employer contribution rates to the Strathclyde Pension Fund (SPF)
are based on an actuarial triennial valuation.  As noted in the previous
paragraph, the last valuation, which took place during 2023
recommended a 3 year package of rates at 6.5% for 2024-25, 6.5% for
2025-26 and 17.5% for 2026-27 (previously that rate was 19.3%) and
this was adopted.  The reduction in rates was a response to the
Strathclyde Pension Fund being valued at 147% funded at the last
actuarial valuation.  This meant that the fund’s assets were 1.47 times
the amount needed to meet the liabilities it had at that date.   
The most recent publicly available estimate of the Strathclyde Pension
Fund shows that the Fund’s position has continued to improve since the
31 March 2023 valuation.  As of 31 March 2025, an indicative funding
level was reported at around 174% and I understand that the position
has improved further to 187% in July 2025.  The next formal actuarial
valuation will be carried out as at 31 March 2026 and reported in 2027,
which will reset contribution requirements for the subsequent 3-year
period.   It is anticipated that there should be a further recurring
reduction in the rate, based on the current surplus position, however,
this is not certain and will depend on the valuation as at 31 March
2026.  The equivalent annualised rate from the previous reduction
would have been 10.2%.  In order to signpost that there is a likelihood of
a reduction to the rate, I am suggesting that we assume no change in
the worst case scenario, a reduction to 15% in the mid-range scenario
(£2.799m) and a reduction to 13% in the best case scenario
(£5.039m).  These estimates will be updated throughout the year as
more information becomes available. 
3.3.11 The changes to the employee budgets estimated over the next five
years for Council services are summarised in the table below.  The
employee cost increases relating to Social Work within the Health and
Social Care Partnership are summarised within paragraph 3.6.7. 
Draft
2026-27
£000
Mid-
Range
2027-28
£000
Mid-
Range
2028-29
£000
Mid-
Range
2029-30
£000
Mid-
Range
2030-31
£000
Pay Award 2026-
27
9,283 14,195 19,254 24,465 29,832
Change to
employee base for
2026-27
(91) (91) (91) (91) (91)
Increase to Chief
Officers Pay
129 132 136 141 145
Increase to
Standby Rate
38 38 38 38 38
Increments 599 1,198 1,797 2,396 2,995
Increase in costs
after one-off
reduction in SPF
rate ceases
6,875 6,875 6,875 6,875 6,875
Page 28

Page 29

Estimated future
reduction to SPF
rate
0 (2,799) (2,799) (2,799) (2,799)
Total Employee
Increases
16,833 19,548 25,210 31,025 36,995 
3.4 Non-Pay Inflation 
3.4.1 The position remains that only unavoidable/inescapable inflation has
been included for 2026-27, this is with a view to only including a
provision in the budget for an inflationary increase where it is absolutely
required. 
3.4.2 The table below summarises the non-pay inflation in the mid-range
scenario for Council services with more detail available in Appendix 2. 
The non-pay inflation increases relating to Social Work within the Health
and Social Care Partnership are summarised within paragraph 3.6.7. 
Inflation Category 2026-27
Previous
estimates
(Feb 2025)
£000
2026-27
Updated
estimates 
£000
Increase/
(Decrease) 
£000
Utilities - Electricity, Gas,
Oil, Water
195 253 58
Central Repairs-Outside
Contractors
75 98 23
Waste/Landfill Tax 335 62 (273)
NPDO/HUB Schools 382 423 41
Community Pool Subsidies 26 39 13
Residential Schools 31 44 13
Pre-Primary Partner
Providers
166 272 106
ICT 238 243 5
Catering Purchases and Milk 60 73 13
Insurance 414 491 77
School & Public Transport 402 433 31
Non-Domestic Rates 10 (189) (199)
Housing Support Contracts 41 72 31
Other small inflationary
movements (School clothing
grants, Audit fees, etc)
120 175 54
Total 2,495 2,489 (6) 
3.4.3 In terms of the budget outlook for 2027-28 to 2030-31 the estimated
impact of unavoidable / inescapable non-pay inflation has been
calculated based on projected inflation rates at this point in time. The
worst case scenario is 0.5% higher than the value included within the
mid-range and the best case is 0.5% less than the mid-range scenario. 
An allowance for unidentified inflation has been included from 2027-28
Page 29

Page 30

onwards at £0.250m per annum within the mid-range scenario and
£0.500m per annum within the worst case scenario. 
3.4.4 The overall additional budget requirement for non-pay inflation
estimated over the next five years is summarised in the table below.
Further detail is provided in Appendix 2.  The estimated inflationary
increases relating to Social Work within the Health and Social Care
Partnership are summarised within paragraph 3.6.7. 
Draft
2026-27
£000
Mid-
Range
2027-28
£000
Mid-
Range
2028-29
£000
Mid-
Range
2029-30
£000
Mid-
Range
2030-31
£000
Unavoidable/
inescapable
Non-Pay
Inflation
2,489 5,901 9,496 13,326 17,406 
3.5 Cost and Demand Pressures 
3.5.1 For a number of years, services have worked on the basis of having to
contain any cost and demand pressures within current resources where
possible.  An allowance for unidentified cost and demand pressures has
been included from 2027-28 onwards at £0.250m per annum in the best
case scenario, £0.500m per annum within the mid-range scenario and
£1.000m per annum within the worst case scenario. 
3.5.2 Since the Policy and Resources Committee on 4 December 2025 the
following changes have been made to the cost and demand pressures: 
 Amended – Schools Residential – projections have been updated
and the pressure has been reduced by £0.200m
 NEW – Waste Uplift provided externally - £0.060m
 NEW – IT Licences for Education - £0.140m
 NEW – Freedom of Information (FOI) Requests - £0.198m
 Amended – Waste BMW ban updated projections reduce the
cost pressure by £0.911m
 NEW – Minimum Income Standards (MIS) Research - £0.030m 
 NEW – Right sizing of budgets within Customer Support Services
- £0.057m
 NEW – Payroll and Pensions Team Resource - £0.155m
 NEW – Management of Council Dams - £0.095m
 NEW – Harbours Repairs and Maintenance - £0.260m
 NEW – Resurfacing Taxiways at Oban Airport - £0.100m
 NEW – Flexible Food and Fuel Fund - £0.104m 
3.5.3 The estimated cost and demand pressures identified for Council
services are noted in the table below, with further detail provided in
Appendix 3.  The cost and demand pressures relating to Social Work
Page 30

Page 31

within the Health and Social Care Partnership are summarised within
paragraph 3.6.7. 
Draft
2026-27
£000
Mid-
Range
2027-28
£000
Mid-
Range
2028-29
£000
Mid-
Range
2029-30
£000
Mid-
Range
2030-31
£000
ASN Support 208 422 422 422 422
School Clothing
Grants
56 56 56 56 56
Schools Residential 600 600 600 600 600
Waste Uplift
provided externally
60 60 60 60 60
IT Licences for
Education
140 140 140 140 140
Education ICT
Network
Infrastructure
0 53 53 53 53
Election Costs 0 350 0 0 0
Freedom of
Information (FOI)
Requests
198 198 198 198 198
Local Development
Plan
50 0 0 0 0
Universal Credit –
HB Admin Grant
40 80 120 160 200
Civica Revenue and
Benefits System
0 63 63 63 63
Payroll and
Pensions Resource
155 77 77 77 77
Microsoft 365
Licences
30 380 380 380 380
Compliance with
BMW Ban
1,568 651 914 914 914
Bus Transport
Contracts
400 400 400 400 400
Minimum Income
Standards (MIS)
Research
30 0 0 0 0
Valuation Joint
Board 
255 301 301 301 301
Security Operations
Centre - Quorum
Cyber Contract
Renewal
43 43 43 43 43
Wi-Fi Network
Subscription
License Costs
15 58 58 58 58
Civica Housing
Case Management
System
32 4 4 4 4
Right sizing of
budgets within
57 58 58 59 60
Page 31

Page 32

Customer Support
Services
Management of
Council Dams
95 98 101 104 107
Harbours Repairs
and Maintenance
260 270 280 290 300
Resurfacing of
Taxiways at Oban
Airport
100 0 0 0 0
Flexible Food and
Fuel Fund
104 104 104 104 104
Allowance for
pressures in future
years
0 500 1,000 1,500 2,000
Total Cost and
Demand
Pressures
4,496 4,966 5,432 5,986 6,540 
3.5.4 Included within the cost and demand pressures and inflation are amounts
relating to School clothing grants of £0.056m and £0.009m respectively.
The Scottish Government has shown a commitment to supporting
families with school clothing grants, particularly those on qualifying
benefits. Originally the amount of the grant was set at £120 for primary
school children and £150 for secondary school pupils payable once per
academic year. Within the 2026-27 budget settlement the Scottish
Government provided £0.700m additional funding Scotland wide towards
the School Clothing Grants of which Argyll and Bute Council’s share was
£0.004m. This was provided as part of the Scottish Governments
commitment to provide funding to allow the grants to rise in line with
inflation albeit Local Authorities retained the flexibility as to whether to
apply any increase as long as the minimum grant levels of £120 and £150
were paid. The additional funding included within the cost pressures and
inflation, if approved by Members, would allow the grant awards to
increase by 6% to £127.20 for primary school children and £159 for
secondary school pupils which would reflect the fact that no inflation has
been applied since implementation in 2021-22.   
3.6 Health and Social Care Partnership (HSCP) 
3.6.1 The Council agreed an allocation to the HSCP of £81.992m for 2025-26
at its meeting on 27 February 2025 which included an additional
recurring funding contribution of £0.500m. The indicative allocation for
2026-27 onwards increased by £3.053m to account for the cessation of
the one-off employer contribution rate saving relating to the Strathclyde
Pension Fund resulting in an increased base allocation previously
agreed for 2026-27 of £85.045m. 
3.6.2 In 2023-24 funding of £0.438m was received in respect of Whole Family
Wellbeing for Children’s Services Planning Partnership and was added
to the HSCP payment at that time. During 2025-26 additional funding of
£0.104m was received in respect of this which again is a straight pass
through to the HSCP and will therefore increase their payment further
Page 32

Page 33

by this amount.  This funding is continuing into 2026-27 but there has
been no confirmation beyond this date and therefore, this has been
removed from payment from 2027-28 pending confirmation that the
funding will continue. 
3.6.3 Additional funding was allocated by the Scottish Government for the
SJC pay award during 2025-26.  As in previous years we agreed to
pass over a proportionate share of this funding to the HSCP and this
amounts to £0.361m in 2026-27 and increases their future payments by
the same amount.   
3.6.4 As part of the Local Government Finance Circular 1/2026 an additional
£0.164m will be distributed in 2025-26 in relation to Children’s Social
Care Fund and this requires to be passed over to the HSCP. 
3.6.5 The Local Government Finance Circular 1/2026 included additional
funding for 2026-27 in relation to the Real Living Wage to be passed
over to the Health and Social Care Partnership for 2026-27. This
comprised of £2.955m relating to Adult Care and £0.173m relating to
Children’s Social Care, totalling £3.128m. 
3.6.6 There are two funding amounts still to be distributed by Scottish
Government.  The first is the Scottish Disability Assistance funding that
was received in previous year and is already included with the HSCP
base payment amounting to £0.035, it is assumed that the distribution
will remain the same.  The other is an increase to Free Personal and
Nursing Care of £7m Scotland wide.  It is assumed that our share will be
£0.153m based on the GAE distribution methodology for Personal and
Nursing Care for Older People.  Should there be any material change to
these figures once distribution is known, the payment to the HSCP will
be adjusted.   
3.6.7 Health and Social Care Partnerships in Scotland continue to face
significant financial pressures.  Rising demand for services, workforce
shortages and the increasing complexity of care are pushing costs
upward at a pace that exceeds available funding.  At the same time,
inflationary pressures and the need to maintain safe staffing levels are
stretching already constrained budgets.  Our HSCP is no different to
those across Scotland and will require to make difficult decisions about
service prioritisations, transformation and efficiency savings to ensure
long-term sustainability.   The most recent budget outlook for 2026-27
for Social Work forecasts a £6.6m gap between the expected cost of
delivering the current level of service and the resources available to
support Social Work and Social Care services. Savings and Reserves of
£3.714m have been identified leaving a budget gap of £2.872m which
Members may wish to consider funding. 
2026-27
£000
Opening Budget Deficit (2,964)
Page 33

Page 34

Cost and Demand Pressures - Pay (5,209)
Cost and Demand Pressures – Non-pay (5,644)
Additional Funding 7,231
Budget Gap Prior to Savings (6,586)
Savings Proposals 3,414
Application of SW Reserves 300
Remaining Budget Gap in 2026-27 2,872 
3.6.8 The revised payment to the Health and Social Care Partnership is noted
below. 
Draft
2026-27
£000
Mid-
Range
2027-28
£000
Mid-
Range
2028-29
£000
Mid-
Range
2029-30
£000
Mid-
Range
2030-31
£000
Base Payment
(as per Budget
2025)
85,045 85,045 85,045 85,045 85,045
Adjustment for
Whole Family
Wellbeing fund
104 (438) (438) (438) (438)
2025-26 Pay
Award
(additional
1%) 
361 361 361 361 361
2025-26
Children’s
Social Care
164 164 164 164 164
Settlement
Changes for
2026-27
3,128 3,128 3,128 3,128 3,128
Share of £7m
Free Personal
and Nursing
Care
153 153 153 153 153
2026-27
Budget Gap
2,872 2,872 2,872 2,872 2,872
Payment to
HSCP
91,827 91,285 91,285 91,285 91,285 
3.7 Live Argyll 
3.7.1 At the 2025-26 budget meeting in February 2025 it was agreed to defer
a policy saving option relating to Live Argyll of £0.311m to 2026-27 and
the management fee base has been reduced to reflect this.  There is
also a change from 2026-27 onwards to increase the management fee
by £0.118m to account for the cessation of the one-off employer
contribution rate saving relating to the Strathclyde Pension Fund.   
Page 34

Page 35

Draft
2026-27
£000
Mid-
Range
2027-28
£000
Mid-
Range
2028-29
£000
Mid-
Range
2029-30
£000
Mid-
Range
2030-31
£000
Management
Fee Base
Change –
saving deferred
from 2025-26 to
2026-27
(311) (311) (311) (311) (311)
Cessation of
SPF
contribution rate
saving
118 118 118 118 118
Change to
Management
Fee
(193) (193) (193) (193) (193) 
3.8 Budget Gap PRIOR to Measures to Balance the Budget 
3.8.1 The budget gap prior to factoring in any previous savings decisions or
potential options towards balancing the budget is summarised in the
table below.     
Draft
2026-27
£000
Mid-
Range
2027-28
£000
Mid-
Range
2028-29
£000
Mid-
Range
2029-30
£000
Mid-
Range
2030-31
£000
Base Budget 331,484 331,484 331,484 331,484 331,484
Employee Cost
Changes
16,833 19,548 25,210 31,025 36,995
Non-Pay
Inflation
2,489 5,901 9,496 13,326 17,406
Cost and
Demand
Pressures
4,496 4,966 5,432 5,986 6,540
(Decrease)/
Increase to
HSCP allocation
(not already in
Council base)*
9,731 9,731 9,731 9,731 9,731
Adjustment to
Live Argyll
Payment (prior
to savings)
(193) (193) (193) (193) (193)
Total Net
Expenditure
364,840 371,437 381,160 391,359 401,963
Total Funding 351,457 343,893 342,891 341,897 340,912
Page 35

Page 36

Budget
Surplus / (Gap)
Cumulative
(13,383) (27,544) (38,269) (49,462) (61,051) 
*The transfer of funding in relation to the 2025-26 adjustment for Whole
Family Wellbeing Fund does not need to be included in the budget gap
calculation as this budget is included within base budget. 
3.9 Measures to Balance the Budget 
3.9.1 Some of the policy options that were agreed at the Council meeting on
27 February 2025 impacted on 2026-27 and beyond.   These are now
factored into the budget outlook, reducing the budget gap. 
3.9.2 There is a separate report included in the budget pack which relates to
fees and charges together with the detailed schedule of charges for
2026-27.  The general inflationary increase to fees and charges is
proposed at 6% for 2026-27.  The general inflationary increase would
give additional income of £0.440m.  There is no general inflationary
increase applied to Piers and Harbours to ensure that any income
generated is not in excess of expenditure.   In terms of the outlook for
2027-28 to 2030-31, fees and charges have been estimated at a 6%
increase in the mid-range scenario (3% in worst case and 9% in best
case). 
3.9.3 Savings options totalling £6.193m for 2026-27 were presented to
Council on 26 November 2025.  The options have been categorised as
either: 
 Management / Operational – meaning they do not result in either
redundancies or any change in policy and can be implemented
without Council approval
 Policy – meaning they require Council approval due to having
staff or policy implications. 
Council agreed to endorse the Management/Operational savings
totalling £3.134m and these were incorporated in the Budget Outlook
report presented to the Policy and Resources Committee on 4
December 2025. 
The proposed policy savings are set out in Appendix 4 alongside
savings templates for each saving options.   
3.9.4 A summary of the savings identified are noted in the table below.  The
changes since the report in November are summarised below:
 Regulatory Services saving removed from
Management/Operational savings as no longer deliverable -
£0.043m
 HR Policy Saving reduced by £0.060m in 2026-27 as now
delayed until 2027-28.
Page 36

Page 37

Saving
Type
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
Management/
Operational 3,091 2,965 2,680 2,680 2,680
Policy 2,999 2,500 2,500 2,500 2,500
Total 6,090 5,465 5,180 5,180 5,180 
3.9.5 The number of staff affected by potential redundancy required the
Council to undertake a statutory 45 day consultation.  This has been
concluded in accordance with the Council’s redundancy policy and
procedures seeking to avoid compulsory redundancy wherever
possible. 
3.9.6 An underspend within the Loans Fund is anticipated in 2025-26 due to a
number of factors including slippage within the capital programme
resulting in a delay in the need to borrow and new borrowing secured at
lower interest rates than the existing debt portfolio average. £1.5m of
this underspend can be earmarked to contribute towards the 2026-27
budget gap. 
3.9.7 Throughout the year there was as assumption of an increase to Council
Tax of 5% in the mid-range scenario across each of the next 5 years. 
This estimate is included within the budget gap figure in Section 3.10.   
3.9.8 The table below summarises the proposed measures to balance the
budget in the mid-range scenario. 
Draft
2026-27
£000
Mid-
Range
2027-28
£000
Mid-
Range
2028-29
£000
Mid-
Range
2029-30
£000
Mid-
Range
2030-31
£000
Previously agreed
Policy Savings 
1,155 2,092 2,833 2,924 2,781
Previously agreed
Management/
Operational Savings 
(48) (9) (9) (9) (9)
Fees and Charges
Increase
440 907 1,402 1,927 2,483
NEW Management/
Operational Options 3,091 2,965 2,680 2,680 2,680
NEW Policy Options 2,999 2,500 2,500 2,500 2,500
Underspend in 2025-
26 Loans Fund
1,500 0 0 0 0
Council Tax Increase  3,543 7,299 11,259 15,436 19,840
Total Measures to
Balance the Budget
12,680 15,754 20,665 25,458 30,275 
3.10 Budget Gap AFTER Measures to Balance the Budget 
3.10.1 The table below summarises the estimated budget gap in the mid-range
scenario. 
Page 37

Page 38

Draft
2026-27
£000
Mid-
Range
2027-28
£000
Mid-
Range
2028-29
£000
Mid-
Range
2029-30
£000
Mid-
Range
2030-31
£000
Budget Gap Prior
to Measures to
Balance Budget
(13,383) (27,544) (38,269) (49,462) (61,051)
Savings
Measures 
12,680 15,754 20,665 25,458 30,275
Estimated
Budget Surplus /
(Gap)
Cumulative
(703) (11,790) (17,604) (24,004) (30,776)
Estimated
Budget Surplus /
(Gap) In Year
(703) (11,087) (5,814) (6,400) (6,772) 
3.10.2 The setting of Council Tax should happen on the same day as the
Council sets its revenue budget as once all proposals are considered,
Council Tax is the balancing figure.  The gap shown in the table above
is based on a 5% Council Tax increase (this is the assumption that has
been in the budget outlook during the year).  In order to get to a
balanced budget, Council will need to increase Council Tax by 6%.  
The alternative to increasing Council Tax further is that Council would
need to fund the gap using reserves or other funds held, which would be
a one-off measure, however, Members need to be mindful of the
significant gap in future years as well as the pressures facing the capital
plan.   The table below summarises the position across the years if
Council tax is increased by 6% in 2026-27 reverting back to an
estimated 5% in future years.   
Draft
2026-27
£000
Mid-
Range
2027-28
£000
Mid-
Range
2028-29
£000
Mid-
Range
2029-30
£000
Mid-
Range
2030-31
£000
Budget Surplus /
(Gap) in Year as
noted in 3.10.1
above
(703) (11,790) (17,604) (24,004) (30,776)
Council Tax
additional income
based on a
further 6%
increase (total
Council Tax of
6%)
703 746 785 824 865
Final Budget
Surplus / (Gap)
Cumulative
0 (11,044) (16,819) (23,180) (29,911)
Page 38

Page 39

Final Budget
Surplus / (Gap)
In Year 
0 (11,044) (5,775) (6,361) (6,731) 
3.10.3 Appendix 5 provides a summary of the draft budget for 2026-27 at
service level.     
3.10.4 Members should note the recurring nature of proposals and how this
impacts future year’s budget estimates.  As an example, should Council
reject a budget saving that is recurring in nature, say for £0.150m and
replace with a one-off measure, the next year budget gap will be
increased by £0.150m. Included within the measures to balance the
2026-27 budget noted above are £7.687m of savings or additional
funding that are one-off in nature and therefore do not contribute to the
budget gap in future years.  This increases pressure on the 2027-28
budget gap and the Council will need to begin the budget process
earlier and accelerate work on medium to longer term savings to be in
the strongest position to achieve financial balance for 2027-28.   
3.11 Balancing Future Years Budget 
3.11.1 The budget gap in the period 2027-28 to 2030-31 across each scenario
is summarised in the table below. 
Budget Gap 2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
Total
£000
Best Case (3,384) (507) (846) (979) (5,714)
Mid-Range (11,044) (5,775) (6,361) (6,731) (29,911)
Worst Case (21,747) (11,783) (12,653) (13,326) (59,509) 
3.11.2 As part of the 2026–27 Scottish Budget, the Scottish Government
confirmed the removal of the legislative cap on Council Tax premiums
for second homes and long-term empty properties.  A Scottish Statutory
Instrument (SSI) was laid on 28 January 2026 that would enable local
authorities to vary premium levels to reflect local circumstances from 1
April 2026.  The SSI must be approved by resolution of the whole
Scottish Parliament before it comes into force.  If Parliament approves,
the regulations can be formally made and then come into effect on 1
April 2026.   It is expected that the SSI would be approved by mid-
March.   
As the legislation will not be in force until 1 April 2026, Council Tax bills
issued in advance of that date will be based on the existing 100%
premium. If Council were minded to agree an increase over what is
currently charged for second homes, affected taxpayers would receive a
revised bill after 1 April 2026, recalculating liability for the remainder of
the financial year and adjusting instalments accordingly. This will require
additional in-year billing activity and associated customer contact but
can be accommodated within existing systems and processes. 
Page 39

Page 40

Initial modelling indicates that increasing the second homes premium
from 100% to, for example, 110% could generate additional income of
around £0.43m per annum, assuming a broadly stable Council Tax
base. However, the actual yield will depend on taxpayer behaviour and
wider housing market responses. 
3.11.3 At the Council meeting held on 26 June 2026, an approach to the
medium term budget was agreed that focused on the development of a
five-year savings pipeline, while recognising the need to address the
significant budget gap facing the Council in 2026–27. Four themes are
being taken forward, as set out below: 
 Empowering Communities
 Increasing Income
 Right Sizing Council Asset Base
 Delivering Services Differently. 
3.11.4 Officers have been progressing with developing options for the medium
term approach, albeit that for a period of time the focus of attention had
to be on identifying savings in the short term to assist with balancing the
2026-27 budget.  The options being considered are summarised below.   
Empowering Communities
 Visitor Levy
 Social and Economic Charter for Energy 
 SSEN Local Fund
 Procurement Strategy to include community wealth creation
 Crowdfunding platform
 Clyde 2070 and the scope for community benefits
 Planning gain framework 
Increasing Income
 Improved Council Tax debt collection
 Increase to Council Tax on second homes
 Opportunities in relation to investment in renewables 
Right Sizing Council Asset Base
 Fleet Utilisation Programme and Replacement Programme
 Sports Pitches, Changing Rooms, Pavilions and Stadiums
 Marine Assets
 Corran Halls Business Model and Redevelopment 
Delivering Services Differently
 Review of duties and powers – linking into work by the
Improvement Service
 Digital opportunities, including AI and automation
 Solace Transformation programme 
3.11.5 The RIS Review is continuing and there are a number of workstreams
being taken forward which should deliver an improvement in data for
Page 40

Page 41

decision making, improved customer service and where possible
savings.  Once the data is improved, a further review will be carried out
outlining other saving opportunities.  The service are working to secure
savings of up to £0.700m in relation to commercial waste and have
offered up savings of over £0.900m in financial year 2026-27 as part of
the 15% savings option exercise that was carried out across services. In
addition, they have secured the RIS review savings target of £0.500m
for 2026-27 due to the significant work in progressing a new contract
post the existing waste PPP contract which comes to an end in
September 2026. 
3.11.6 The Education Review was agreed by Council on 26 November 2025. 
In addition to offering up savings of £1.334m in 2026-27 rising to
£2.500m in 2027-28, ten themed recommendations were agreed that
are designed for phased delivery over a 2-4 year period.  Careful
planning will be undertaken to ensure that the various
interdependencies of different recommendations are taken forward in a
systematic, coherent manner. 
3.11.7 It is proposed to establish a Programme Management Office (PMO)
responsible for co-ordination and delivery of both capital and
transformation projects, to address issues including:
 Insufficient capacity to progress transformational change and
maintain business as usual.
 Scale and complexity of organisational change that requires a more
consistent, corporate and disciplined approach to programme and
project management.
 Ensuring the Council can deliver its strategic priorities, respond
effectively to external audit scrutiny and build the foundations for
sustainable multi-year transformation.
 Addressing recent external audit findings (see below) and best
practice evidence identified by the Accounts Commission. 
3.11.8 Our external auditors Forvis Mazars as part of their Best Value
Thematic Review on Transformation (reported to Audit and Scrutiny
Committee on 27 January 2026) have recommended that the Council
should consider the creation of a Programme Management Office to
manage Transformation and other major projects to ensure oversight
and increase the pace of change.  The options noted below address
that recommendation.     
3.11.9 The PMO will provide a central core of expertise, standards and
assurance, while enabling services to retain ownership and delivery
responsibility for individual projects. A PMO will ensure consistent
governance, standardised project management approaches and clear
accountability for delivery, enabling faster and more effective decision-
making. It would also improve the pace and quality of delivery,
strengthen benefits realisation and financial discipline, and enhance the
management of risks and interdependencies across the programme. 
Page 41

Page 42

3.11.10 The successful establishment of a PMO will require strong senior
leadership with significant experience of delivering comparable
organisational change and this can be delivered by one of two options.  
In both of the options, it is envisaged that the postholder would lead the
PMO for a minimum period of two years. During this time, the Chief
Executive will review the wider senior management structure to ensure
it remains fit for the future, noting that a number of senior officers are
approaching retirement age. 
3.11.11 The core functions of the lead postholder will be to:
 Establish and lead the PMO Delivery Unit
 Drive organisational transformation initiatives
 Develop a detailed and costed medium term transformation plan for
dealing with a full project and transformation portfolio.
 Develop and manage a pipeline of strategic projects.   
3.11.12 Option 1
A new permanent Head of Service post (Head of Transformation) be
established to lead the PMO.  Appointing a new permanent post Head of
Service post to lead organisational transformation offers long-term
continuity, succession planning and sustained impact. A permanent
leader will embed themselves within the culture, build lasting
relationships, and ensure that transformation initiatives are consistently
driven forward, adapting to evolving needs over time. Their ongoing
presence allows for ownership and accountability throughout the
change process and beyond. 
3.11.13 Option 2
Procure external expertise to lead the PMO. Bringing in a temporary
subject expert for a fixed period would provide specialist knowledge and
a focused, time-bound injection of expertise. While this can accelerate
specific aspects of transformation, the temporary nature of the role may
limit continuity and ownership once their tenure ends. Knowledge
transfer and maintaining momentum can be challenging when the
expert departs, potentially resulting in fragmented progress or the need
for further interventions. 
3.11.14 A permanent appointment supports sustained change and
organisational learning, while a temporary expert is best suited for
targeted, short-term objectives where deep, specialised input is
required. 
3.11.15 In both options, the PMO hub would be resourced by project managers
and support staff, drawing in part on existing resources currently
responsible for delivering projects beyond business-as-usual activity or
larger, more complex initiatives. It is recognised, however, that the PMO
will require additional capacity, either through the recruitment of in-
house staff or the commissioning of specialist external support where
specific expertise is not available internally.  It is estimated that either
option will require a drawdown of up to £0.600m over a two-year period,
to be funded from the Strathclyde Pension Fund gain monies that were
Page 42

Page 43

set aside to support transformation and spend-to-save initiatives by
Council at the February 2024 budget meeting. 
3.11.16 As officers, our recommendation is that Option 1 is pursued.  This would
require Member approval for the creation of a recruitment panel.   If
Members are not minded to proceed on that basis then officers can
implement Option 2 under the current delegation which set aside
funding in the General Fund for transformation/spend to save projects
and required that officers provide reports on the drawdowns from the
General Fund balance to be submitted to the Policy and Resources
Committee as part of the monitoring pack.   
4. CONCLUSION 
4.1 This report summarises the position with regard to the key issues
surrounding the revenue budget and setting of council tax for 2026-27. 
It also provides estimates of the budget outlook for the period 2027-28
to 2030-31. 
4.2 All proposals included within this report result in a balanced budget for
2026-27.   
4.3 There remains a significant budget gap in future years and officers will
continue to explore options to generate future savings or additional
income.   
4.4 The Council are asked to consider the funding requests summarised
within Appendix 6.  If Members are minded to support the funding
request consideration needs to be given as to how they would be
funded.     
5. IMPLICATIONS 
5.1 Policy – There are policy implications associated with the new saving
options and also previously agreed savings options which impact 2026-
27 and beyond.   
5.2 Financial – The report outlines the budget position over 2026-27 to
2030-31. 
5.3 Legal – Any legal implications have and will be considered when
developing savings options. 
5.4 HR – Any HR implications have and will be considered when developing
savings options. 
5.5  Customer Service – There may be some customer service implications
arising from the new savings options.  Future customer service
implications will be considered when developing savings options. 
Page 43

Page 44

5.6 Risk – There is a separate report assessing financial risks and there is
also an overall assessment of risk included within the separate report on
Reserves and Balances. 
5.7 Climate Change – The Council is committed to addressing climate
change and reviews of how Services are delivered is ongoing within the
available budget resources.  
5.8 Fairer Scotland Duty – Integrated Impact Assessments have been
completed for savings as required. 
5.9 Equalities (protected characteristics) – Integrated Impact Assessments
have been completed for savings as required. 
5.10 Consumer Duty – Integrated Impact Assessments have been completed
for savings as required. 
5.11 Island Communities - Integrated Impact Assessments have been
completed for savings as required. 
5.12 Children’s Rights and Wellbeing – Integrated Impact Assessments have
been completed for savings as required. 
Kirsty Flanagan
Executive Director /Section 95 Officer
11 February 2026 
Councillor Ross Moreland, Policy Lead for Finance and Commercial Services 
APPENDICES:
Appendix 1 – 2026-27 to 2030-31 Budget Outlook Scenarios 
Appendix 2 – Non-Pay Inflation Estimates 2026-27
Appendix 3 - Cost and Demand Pressures 2026-27 to 2030-31
Appendix 4 – New Policy Options Savings Summary and Templates 
Appendix 5 – Service Summary of Budget Position 
Appendix 6 – Funding Requests 
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk
Page 44

Page 45

BUDGET OUTLOOK 2026-27 to 2030-31 APPENDIX 1
BUDGET PACK - 25 FEBRUARY 2026
DRAFT
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
Base Budget 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289
Base Budget Adjustments 3,195 3,195 3,195 3,195 3,195 3,195 3,195 3,195 3,195 3,195 3,195 3,195 3,195
Revised Base Budget 331,484 331,484 331,484 331,484 331,484 331,484 331,484 331,484 331,484 331,484 331,484 331,484 331,484
Impact of Pay Award - SJC, Teachers and Chief Officers 9,192 14,104 17,477 20,917 24,426 14,104 19,163 24,374 29,741 17,378 25,973 34,998 44,474
Pay Increments 599 899 1,198 1,498 1,797 1,198 1,797 2,396 2,995 1,198 1,797 2,396 2,995
Re-instate Employers Superannuation Rate 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875
Chief Officers Pay Increase 129 132 136 141 145 132 136 141 145 132 136 141 145
Standby Rate Increase 38 38 38 38 38 38 38 38 38 38 38 38 38
Estimated Employers Superannuation Rate Reduction from 2027/28 0 (5,039) (5,039) (5,039) (5,039) (2,799) (2,799) (2,799) (2,799) 0 0 0 0
Total Employee Cost Changes (Council Services) 16,833 17,009 20,685 24,430 28,242 19,548 25,210 31,025 36,995 25,621 34,819 44,448 54,527
Non-Pay Inflation - Council Services 2,489 4,918 7,831 10,945 14,272 5,901 9,496 13,326 17,406 6,871 11,155 15,713 20,561
ASN Support 208 422 422 422 422 422 422 422 422 422 422 422 422
School Clothing Grants 56 32 32 32 32 56 56 56 56 79 79 79 79
Schools Residential 600 600 600 600 600 600 600 600 600 600 600 600 600
Waste uplift provided externally 60 60 60 60 60 60 60 60 60 60 60 60 60
IT Licences for Education 140 140 140 140 140 140 140 140 140 140 140 140 140
Education ICT Network Infrastructure 0 53 53 53 53 53 53 53 53 53 53 53 53
Election Costs 0 327 0 0 0 350 0 0 0 370 0 0 0
Freedom of Information (FOI) Requests 198 198 198 198 198 198 198 198 198 198 198 198 198
Planning (Local Development Plan) 50 0 0 0 0 0 0 0 0 0 0 0 0
Housing Benefits Admin Grant 40 80 120 160 200 80 120 160 200 80 120 160 200
Civica Revenue and Benefits System 0 37 37 37 37 63 63 63 63 137 137 137 137
Payroll and Pensions Resource 155 77 77 77 77 77 77 77 77 77 77 77 77
Microsoft 365 Licenses 30 380 380 380 380 380 380 380 380 400 400 400 400
Compliance with BMW Ban 1,568 651 914 914 914 651 914 914 914 651 914 914 914
Bus Transport Contracts 400 360 360 360 360 400 400 400 400 440 440 440 440
Minimum Income Standard (MIS) Research 30 0 0 0 0 0 0 0 0 0 0 0 0
Valuation Joint Board 255 301 301 301 301 301 301 301 301 301 301 301 301
Security Operations Centre - Quorum Cyber Contract Renewal 43 43 43 43 43 43 43 43 43 43 43 43 43
Wi-Fi Network Subscription License Costs 15 58 58 58 58 58 58 58 58 58 58 58 58
Civica Housing Case Management System 32 4 4 4 4 4 4 4 4 4 4 4 4
Right sizing of budgets within Customer Support Services 57 58 58 59 60 58 58 59 60 98 101 104 107
Management of Council Dams 95 98 101 104 107 98 101 104 107 340 355 360 375
Harbours Repairs and Maintenance 260 135 140 145 150 270 280 290 300 58 58 59 60
Resurfacing of Taxiways at Oban Airport 100 0 0 0 0 0 0 0 0 0 0 0 0
Flexible Food and Fuel Fund 104 104 104 104 104 104 104 104 104 104 104 104 104
Allowance for Cost and Demand Pressures Future Years 0 250 500 750 1,000 500 1,000 1,500 2,000 1,000 2,000 3,000 4,000
Total Cost and Demand Pressures 4,496 4,468 4,702 5,001 5,300 4,966 5,432 5,986 6,540 5,713 6,664 7,713 8,772
Adjustment to Health and Social Care Partnership Payment 9,731 9,937 9,937 9,937 9,937 9,731 9,731 9,731 9,731 9,731 9,731 9,731 9,731
Adjustment to Live Argyll Management Fee (193) (193) (193) (193) (193) (193) (193) (193) (193) (193) (193) (193) (193)
Total Estimated Expenditure PRIOR to measures to balance the budget 364,840 367,623 374,446 381,604 389,042 371,437 381,160 391,359 401,963 379,227 393,660 408,896 424,882
Scottish Government Grant 273,050 273,050 273,050 273,050 273,050 271,686 270,328 268,976 267,631 270,320 267,617 264,941 262,292
Packing Extended Producer Responsibility Funding - DEFRA 2,851 2,851 2,851 2,851 2,851 1,426 1,426 1,426 1,426 0 0 0 0
Further Reduction to Level Playing Field Support Funding 0 (430) (430) (430) (430) (430) (430) (430) (430) (430) -430 (430) (430)
Transfer from Reserves - EPR funding carried forward from 2025-26 1,438 0 0 0 0 0 0 0 0 0 0 0 0
Transfer from Reserves - SPF Gain agreed February 2024 2,000 0 0 0 0 0 0 0 0 0 0 0 0
Transfer from Reserves - Funding set aside for Pay Award 1,261 0 0 0 0 0 0 0 0 0 0 0 0
Council Tax 70,857 71,538 72,075 72,616 73,161 71,211 71,567 71,925 72,285 70,884 71,061 71,239 71,417
Total Funding 351,457 347,009 347,546 348,087 348,632 343,893 342,891 341,897 340,912 340,774 338,248 335,750 333,279
Budget Surplus / (Gap) PRIOR to measures to balance the budget (13,383) (20,614) (26,900) (33,517) (40,410) (27,544) (38,269) (49,462) (61,051) (38,453) (55,412) (73,146) (91,603)
Measures to Balance the Budget:
Fees and Charges 440 1,140 1,903 2,735 3,642 907 1,402 1,927 2,483 673 913 1,161 1,416
Council Tax Increase 4,251 8,510 13,039 17,853 22,968 8,024 12,004 16,200 20,624 8,474 12,944 17,675 22,682
Council Tax Increase (Growth element) 0 32 64 98 134 21 40 60 81 11 21 32 44
Policy Savings Agreed Feb 2023 619 1,456 2,197 2,288 2,145 1,456 2,197 2,288 2,145 1,456 2,197 2,288 2,145
Management/Operational Options Agreed Feb 2025 (48) (9) (9) (9) (9) (9) (9) (9) (9) (9) (9) (9) (9)
Policy Options 2025 536 636 636 636 636 636 636 636 636 636 636 636 636
New Management/Operational Options 2026 3,091 2,965 2,680 2,680 2,680 2,965 2,680 2,680 2,680 2,965 2,680 2,680 2,680
New Policy Savings Options 2026 2,999 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500
Underspend in Loans Fund in 2025/26 1,500 0 0 0 0 0 0 0 0 0 0 0 0
Rounding (5)
Total Measures to Balance the Budget 13,383 17,230 23,010 28,781 34,696 16,500 21,450 26,282 31,140 16,706 21,882 26,963 32,094
Budget Surplus / (Gap) Cumulative AFTER measures to balance the budget 0 (3,384) (3,890) (4,736) (5,714) (11,044) (16,819) (23,180) (29,911) (21,747) (33,530) (46,183) (59,509)
Budget Surplus / (Gap) In Year AFTER measures to balance the budget 0 (3,384) (507) (846) (979) (11,044) (5,775) (6,361) (6,731) (21,747) (11,783) (12,653) (13,326)
Mid-Range ScenarioBest Case Scenario Worst Case Scenario
Page 45

Page 46

#
NON-PAY INFLATION (COUNCIL) Appendix 2
Service Category Basis of Inflation Inflation
Percentage
Mid Range
2026/27
Council Wide Electricity Based on the November 2025 Bank of England Monetary Policy Committee CPI Forecast for 2026 Q1, with a 0.5% tolerance for best
and worst case.
3.10% 137,716
Council Wide Gas Based on the November 2025 Bank of England Monetary Policy Committee CPI Forecast for 2026 Q1, with a 0.5% tolerance for best
and worst case.
3.10% 29,234
Council Wide Heating Oils Based on the November 2025 Bank of England Monetary Policy Committee CPI Forecast for 2026 Q1, with a 0.5% tolerance for best
and worst case.
3.10% 13,421
Council Wide Solid Fuel Based on the November 2025 Bank of England Monetary Policy Committee CPI Forecast for 2026 Q1, with a 0.5% tolerance for best
and worst case.
3.10% 10,419
Council Wide Water Charges Based on the November 2025 Bank of England Monetary Policy Committee CPI Forecast for 2026 Q1, with a 0.5% tolerance for best
and worst case.
3.10% 19,279
Council Wide Vehicle Fuel Based on the November 2025 Bank of England Monetary Policy Committee CPI Forecast for 2026 Q1, with a 0.5% tolerance for best
and worst case.
3.10% 39,395
Council Wide Central Repairs - Outside Contractors Based on estimate for RPI at 2026 Q1 tracking the Bank of England forecast for CPI at November 2025, with 0.5% tolerance for best
and worst case.
3.70% 98,279
Council Wide Insurances Mid-point set at 16% in line with the 2025/26 increase in insurance costs, with 0.5% tolerance for best and worst case. 16.00% 490,534
Council Wide Contribution to Joint Boards Based on the November 2025 Bank of England Monetary Policy Committee CPI Forecast for 2026 Q1, with a 0.5% tolerance for best
and worst case.
3.10% 47,285
Council Wide Non-Domestic Rates Estimate for the increase in Non-Domestic Rates, with a tolerance of 0.5% for best and worst case. -3.45% (188,983)
Council Wide COSLA Annual Membership Fees Annual membership fee inflation agreed by member Councils. 7.50% 12,912
709,491
Education Pre-Primary Partner Provider Uplift Reflects the 2025/26 increase in the Real Living Wage from £12.60/hr to £13.45/hr, with a tolerance of 0.5% for best and worst case. 6.75% 271,606
Education External School Placements Based on the November 2025 Bank of England Monetary Policy Committee CPI Forecast for 2026 Q1, with a 0.5% tolerance for best
and worst case.
3.10% 44,136
Education School Clothing Grant Based on estimate for RPI at 2026 Q1 tracking the Bank of England forecast for CPI at November 2025, with 0.5% tolerance for best
and worst case.
3.70% 8,917
Commercial Services Catering Purchases Based on the November 2025 Bank of England Monetary Policy Committee CPI Forecast for 2026 Q1, with a 0.5% tolerance for best
and worst case.
3.10% 72,664
Legal & Regulatory Support Leisure SLA-MAKI/Islay Pools Based on estimate for RPI at 2026 Q1 tracking the Bank of England forecast for CPI at November 2025, with 0.5% tolerance for best
and worst case.
3.70% 7,658
Legal & Regulatory Support Leisure SLA-Atlantis Based on the movement in RPIX between September 2024 and September 2025 per the SLA, with 0.5% tolerance for best and worst
case.
4.50% 31,414
Legal & Regulatory Support NPDO-Variable Element Based on estimate for RPI at 2026 Q1 tracking the Bank of England forecast for CPI at November 2025, with 0.5% tolerance for best
and worst case.
3.70% 333,909
Legal & Regulatory Support NPDO-Utilities Rebate Based on estimate for RPI at 2026 Q1 tracking the Bank of England forecast for CPI at November 2025, with 0.5% tolerance for best
and worst case.
3.70% (12,632)
Legal & Regulatory Support NPDO-Electricity Based on the November 2025 Bank of England Monetary Policy Committee CPI Forecast for 2026 Q1, with a 0.5% tolerance for best
and worst case.
3.10% 21,525
Legal & Regulatory Support NPDO-Gas Based on the November 2025 Bank of England Monetary Policy Committee CPI Forecast for 2026 Q1, with a 0.5% tolerance for best
and worst case.
3.10% 8,723
Legal & Regulatory Support NPDO-Heating Oil Based on the November 2025 Bank of England Monetary Policy Committee CPI Forecast for 2026 Q1, with a 0.5% tolerance for best
and worst case.
3.10% 3,420
Legal & Regulatory Support NPDO-LPG Based on the November 2025 Bank of England Monetary Policy Committee CPI Forecast for 2026 Q1, with a 0.5% tolerance for best
and worst case.
3.10% 2,977
Legal & Regulatory Support NPDO-Water Based on the November 2025 Bank of England Monetary Policy Committee CPI Forecast for 2026 Q1, with a 0.5% tolerance for best
and worst case.
3.10% 12,793
Legal & Regulatory Support HUB-Variable Element Based on estimate for RPI at 2026 Q1 tracking the Bank of England forecast for CPI at November 2025, with 0.5% tolerance for best
and worst case.
3.70% 52,261
859,371
Customer and Support Services ICT Estimate added at 10% to reflect input from ICT on increasing costs. 10.00% 243,490
Customer and Support Services Customer Service Point Contracts Based on estimate for RPI at 2026 Q1 tracking the Bank of England forecast for CPI at November 2025, with 0.5% tolerance for best
and worst case.
3.70% 746
Financial Services Annual External Audit Fee Based on the November 2025 Bank of England Monetary Policy Committee CPI Forecast for 2026 Q1, with a 0.5% tolerance for best
and worst case.
3.10% 11,204
Roads and Infrastructure Public Transport Reflects a 3% uplift for annual inflation set within the terms of the contracts between the Council and the service providers. 3.00% 275,994
Council Wide Total
Executive Director Douglas Hendry - Total
Page 46

Page 47

Classification: OFFICIAL#
Service Category Basis of Inflation Inflation
Percentage
Mid Range
2026/27
Roads and Infrastructure School Transport Reflects a 3% uplift for annual inflation set within the terms of the contracts between the Council and the service providers. 3.00% 157,139
Roads and Infrastructure Helensburgh Waste Disposal Costs Based on estimate for RPI at 2026 Q1 tracking the Bank of England forecast for CPI at November 2025, with 0.5% tolerance for best
and worst case.
3.70% 62,050
Roads and Infrastructure Scottish Environmental Protection Agency Reflects the annual inflation trend in the 2023/24 and 2024/25 financial years with a 0.5% tolerance for best and worst case. 8.00% 7,789
Roads and Infrastructure Roads - Bitumen for Road Surfacing Based on the November 2025 Bank of England Monetary Policy Committee CPI Forecast for 2026 Q1, with a 0.5% tolerance for best
and worst case.
3.10% 18,386
Roads and Infrastructure Electricity - Street Lighting Based on the November 2025 Bank of England Monetary Policy Committee CPI Forecast for 2026 Q1, with a 0.5% tolerance for best
and worst case.
3.10% 35,171
Roads and Infrastructure Electricity - Vehicle Charging Points Based on the November 2025 Bank of England Monetary Policy Committee CPI Forecast for 2026 Q1, with a 0.5% tolerance for best
and worst case.
3.10% 9,144
Roads and Infrastructure Strathclyde Passenger Transport Requisitions Based on the 2025/26 Scottish Government Revenue Funding floor adjustment value for the Council, with a 0.5% tolerance for best
and worst case.
1.95% 12,360
Roads and Infrastructure Refuse Vehicle Ferry Fares Reflects impact on the budget of the published increase in Calmac Ferry Fares for 2025/26, with a tolerance of 0.5% for best and
worst case.
5.00% 14,049
Development & Economic
Growth
Housing Support Contracts Reflects the 2025/26 increase in the Real Living Wage from £12.60/hr to £13.45/hr, with a tolerance of 0.5% for best and worst case. 6.75% 72,344
919,866
2,488,728
Executive Director Kirsty Flanagan - Total
Total Non-Pay Inflation in the Mid Range
Page 47

Page 48

COUNCIL COST AND DEMAND PRESSURES 2026-27 to 2030-31
Department Service Cost/Demand Pressure 2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
Executive Director -
Douglas Hendry
Education The demand for ASN support in Argyll and Bute has continued to grow with a significant increase in, and
early identification of children and young people presenting with complex additional support needs,
including mental health difficulties which manifests often in dysregulated behaviours.  Scottish
Government statistics show that the number of pupils identified with ASN has increased markedly since
2010 and there continue to be year on year increases. These increases are likely due to continue as we see
the long-term impact of the Covid 19 pandemic on children and young people who were born from 2020
onwards and as we work with partners to streamline assessment processes which help us to understand
need more thoroughly.  Scottish Government statistical datasets show that the percentage of school roll
in mainstream schools of pupils with ASN has increased by approximately 3% year on year.  Within many
authorities, this means increased numbers of children accessing specialist provision. As Argyll and Bute do
not have equitable access to Specialist provision in all areas, the cost pressure associated with offering
appropriate support within our local schools continues to increase in line with need.
208 422 422 422 422 208 422 422 422 422 208 422 422 422 422
Executive Director -
Douglas Hendry
Education Rightsize of School Clothing Grant Budget - Argyll and Bute Council  pay  the national minimum rate for
School Clothing Grants.  The payment is currently £120 for Primary School Children and £150 for
Secondary School children.   Over the past two years the number of clothing grants issued has increased
and left Education with a demand pressure. Furthermore it is proposed that a 6% increase to the school
clothing grants is applied to increase payments to £127.20 and £159 for primary and secondary pupils
respectively.
32 32 32 32 32 56 56 56 56 56 79 79 79 79 79
Executive Director -
Douglas Hendry
Education Rightsize the Schools Residential Budget - The Education Service contribute 38% towards the cost of 
jointly funded out of area Residential Placements with Social Work contributing 62%.  Education also have
a number of out of area day placements which they pay 100% of the cost.  Over recent years the cost of
these placements has risen significantly due to a reduction in subsidy for Grant Aided Special Schools
(GASS) by the Govenment, along with the increase in demand for these type of placements.  This has led
to a cost pressure of £600k.
600 600 600 600 600 600 600 600 600 600 600 600 600 600 600
Executive Director -
Douglas Hendry
Education A number of schools get their waste uplifted by Biffa as the Internal Service could not provide this service
due to the size of the bins, this contract has been in place for a number of years.  Education have
managed to offset this pressure from underspends elsewhere within the service, however this is no longer
sustainable.
60 60 60 60 60 60 60 60 60 60 60 60 60 60 60
Executive Director -
Douglas Hendry
Education IT Licenses for Education, these costs had historically been paid from a central budget, however as this
cost increased this was no longer affordable.  The schools equipment budget was then top sliced to cover,
however this is no longer affordable due to falling school rolls, inflation never having been applied to
amount per pupil calculation.  Therefore, this is a rightsize of this budget which will be paid from a school
central budget and will be added to the non pay inflation calculation which is included in the budget
outlook projection.
140 140 140 140 140 140 140 140 140 140 140 140 140 140 140
Executive Director -
Douglas Hendry and
Kirsty Flanagan
Education and ICT The Education ICT Network required transformative technology upgrade, with improved security and
reconfiguration to support in-school and at home learning, was approved as part of the budget for 2025-
26.  However, the recommended cost plan included additional revenue consequences from 2027-28,
estimated at £53k per annum, in respect of network equipment licencing costs.  
0 53 53 53 53 0 53 53 53 53 0 53 53 53 53
Executive Director -
Douglas Hendry
Legal and Regulatory
Services
Estimated cost (to be borne by the Council)  of carrying out local Government elections in May 2027 (and
in financial year 2027/28). Operating approx. 100 polling stations and carrying out poll and count for 11
Multi member wards – requiring 11 separate counts
0 327 0 0 0 0 350 0 0 0 0 370 0 0 0
Executive Director -
Douglas Hendry
Legal and Regulatory
Services
Due to the continuing increase in Freedom of Information (FOI) requests and Subject Access Requests
(SAR) and the increasing complexity of these requests, along with a steep rise in complaints, the existing
team are only able to meet the statutory requirements and timescales of fulfilling these requests by
working longer hours both in the evenings and on Saturdays, which is not sustainable in the longer term.
Officers have been carrying out this work, often unpaid. This is a small team who are also involved in the
Election work and record management duties. The volume of work is taking both the Governance, Risk
and Safety Manager and the assistant Compliance and Regulatory Officer away from their operational
remits and is not an effective use of their time. Consequently, the department has a demand pressure
request for three additional posts to alleviate the current pressure and to meet all the Councils statutory
requirements. In addition to seeking additional staffing to meet the increasing workload, it is proposed
that the Team engage with ICT & the Customer Engagement and Transformation Manager who have
expertise in use of automation to obtain advice and assistance on how the Team could utilise AI to reduce
the bureaucratic burden as much as possible by exploiting all AI options including BOTS.
198 198 198 198 198 198 198 198 198 198 198 198 198 198 198
Best Case Mid-Range Worst Case
APPENDIX 3
Page 48

Page 49

COUNCIL COST AND DEMAND PRESSURES 2026-27 to 2030-31
Department Service Cost/Demand Pressure 2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
Best Case Mid-Range Worst Case
APPENDIX 3
Executive Director -
Kirsty Flanagan
Development &
Economic Growth
Local development plan will require to be done under the new Planning legislation which is a revised
process from the current one and will have a 10 year life. The new process has 2 stages where there is
likely to be a cost pressure - a gate check followed by an examination some time later.
50 0 0 0 0 50 0 0 0 0 50 0 0 0 0
Executive Director -
Kirsty Flanagan
Financial Services Universal Credit “Full” Service went live in Sept 2018, managed migration for working age claimants began
in August 2023 and will be completed by December 2025. Details of the migration of Pension age Housing
Benefit claimants have not yet been released initial indications was that the overall migration to Pension
Credit will be completed in 2028/2029 although that looks unlikely now. The DWP will reduce the Housing
Benefit Administration Subsidy they pay to the Council as some claimants come off of Housing Benefit
processed by Council staff and go onto Universal Credit processed by the DWP.  The Council’s caseload has
reduced since implementation of Universal Credit but it is hard to predict just how quickly the rest of the
caseload will migrate from Housing Benefit to Universal Credit between now and 2028/2029.  These
figures represent our best estimates at this time.
40 80 120 160 200 40 80 120 160 200 40 80 120 160 200
Executive Director -
Kirsty Flanagan
Financial Services The Council has been engaged in discussions with the supplier of the Revenues and Benefits Management
System and also the Electronic Document Management System.  We expect cost increases in the future as
the supplier moves the systems to the Cloud.  The cost presure is an estimate at this time and will be
refined as we get nearer to 2027-28.
0 37 37 37 37 0 63 63 63 63 0 137 137 137 137
Executive Director -
Kirsty Flanagan
Financial Services The workload of the payroll and pensions team has grown due to increased volume of salary sacrifice/AVC
schemes, increased requirements regarding pension reporting and increased workload as a result of the
implementation of the new i-Trent system. An element of this pressure will be one-off in nature as
implementation issues are rectified but there will also be a recurring increase in workloads on an ongoing
basis. A report is being presented to Policy and Resources Committee on 19 February 2026 in relation to
this pressure.
155 77 77 77 77 155 77 77 77 77 155 77 77 77 77
Executive Director -
Kirsty Flanagan
Financial Services Flexible Food and Fuel Fund - UK Shared Prosperity Fund (UKSPF) revenue funding will end in March 2026,
with no replacement allocation for Argyll and Bute from successor UK Government funds for at least the
next three financial years. A report is being presented to Policy and Resources Committee on 19 February
2026 in relation to this pressure.
104 104 104 104 104 104 104 104 104 104 104 104 104 104 104
Executive Director -
Kirsty Flanagan
ICT Microsoft 365 License Costs.  An earmarked reserve, set up to contribute towards the licensing and set-up
costs for the Microsoft 365 rollout, is projected to be fully depleted during 2026-27, with an estimated
budget pressure of £30k in 2026-27, increasing to £380k in 2027-28.  These estimates are subject to
change, should licence upgrades be required for Power BI or Teams Telephony. 
30 380 380 380 380 30 380 380 380 380 50 400 400 400 400
Executive Director -
Kirsty Flanagan
Roads & Infrastructure
Services
Relates to compliance with the biodegradable municipal waste (BMW) ban on mainland sites in addition
to continuing land filling on the island sites until the full ban comes into place on 1 January 2028. The cost
pressure also takes into consideration the contract changes required following the end of the PPP
agreement in September 2026. Due to the uncertainty with the cost pressure at this stage, it was deemed
prudent to have a contingency allowance built in at this time and this will be monitored during 2026-27
and if no longer needed would be reported through the routine budget reports.
1,568 651 914 914 914 1,568 651 914 914 914 1,568 651 914 914 914
Executive Director -
Kirsty Flanagan
Roads & Infrastructure
Services
Bus Transport contracts have seen a significant increase in new contract prices due to increased costs for
fuel, insurance, maintenance, regulatory compliance and driver wages.  For example, during 2024/25, new
contracts resulted in an overall increase in annual costs of £975k across Argyll and Bute. Contracts due for
renewal during October 2025 have been extended into early 2026 to provide additional time for
negotiation. The new contract values are currently expected to be confirmed by the end of February 2026
with cost increases estimated at £400k.
360 360 360 360 360 400 400 400 400 400 440 440 440 440 440
Executive Director -
Kirsty Flanagan
Economic
Development
Commissioning Minimum Income Standard (MIS) research work in partnership with Shetlands Islands
Council.
30 0 0 0 0 30 0 0 0 0 30 0 0 0 0
Council Wide Council Wide A letter from the Dunbartonshire and Argyll and Bute Valuation Joint Board was received on 30 January
2025 advising of the financial challenges facing the Board and the estimated 2025-26 to 2027-28 budget
gaps along with a request to increase the level of contribution that we make to the Board.  Since 2012-13
the core constituent funding to the Board has either reduced or been flat cash for the past 7 years with
the Board heavily reliant on reserves.  As the reserves will be fully depleted by 2025-26 there is a required
for the requisitions to increase.
255 301 301 301 301 255 301 301 301 301 255 301 301 301 301
Executive Director -
Kirsty Flanagan
ICT The Security Operations Centre (SOC) contract with Quorum Cyber provides constant monitoring of the
council’s networks and 24/7/365 protection by proactively monitoring, detecting and analysing data, and
providing incident response and recovery. It works alongside the council’s internal security posture to
ensure we can operate securely, at all times. It is now an essential service for the Council and was funded
for the first three years from earmarkings but will require a cost pressure from 2026/27 of £43k per
annum.
43 43 43 43 43 43 43 43 43 43 43 43 43 43 43
Executive Director -
Kirsty Flanagan
ICT The Council’s Wi-fi network is based on a subscription licensing model from CISCO. Our current
subscription was paid from excess capital and revenue but expires in January 2027 and will need renewed
at a cost of £175k. This will cover a three year subscription.
15 58 58 58 58 15 58 58 58 58 15 58 58 58 58
Page 49

Page 50

COUNCIL COST AND DEMAND PRESSURES 2026-27 to 2030-31
Department Service Cost/Demand Pressure 2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
2030-31
£000
Best Case Mid-Range Worst Case
APPENDIX 3
Executive Director -
Kirsty Flanagan
ICT / Housing Works with Civica to upgrade the Civica Housing Case Management System, including the addition of
Multi Factor Authentication and system version upgrades. 2026/27 initial cost of £31,900, with future
annual costs of £3,510 from 2027-28 (subject to inflation).
32 4 4 4 4 32 4 4 4 4 32 4 4 4 4
Executive Director -
Kirsty Flanagan
CSS - Various budget
right-sizing
Right sizing of various budgets that have moved over the last few financial years that as a group now have
a material impact and the department’s ability to absorb these pressures is no longer possible. These
increases are made up of; the COSLA digital office costs, income budget for insurance recoveries that are
no longer realised, Local Government Information Unit (LGIU) invoice, reduction in demand for
Registration services which has been overestimated since the post-pandemic single year wedding surge,
which skewed the figures.
57 58 58 59 60 57 58 58 59 60 57 58 58 59 60
Executive Director -
Kirsty Flanagan
RIS -Management of
Council Dams
Cost pressure associated with the management of dams to ensure inspections, oversight and cyclical
maintenance works are in place to meet the requirements of SEPA. Historically these costs were charged
to the property maintenance budget which is intended for the upkeep of Roads and Infrastructure
buildings such as depots therefore is not sustainable. Insufficient budget resulted in the non-compliance
of the requirements set by SEPA in relation to our dams. The 3 dams this cost pressure relates to are
Bishops Glen (£33k), Kirk Dam (£31k) and Millknowe Floor Storage (£31k) and assumed inflation of 3% has
been added for future years. The additional budget will cover a number of activities including weekly
inspections, maintenance costs including cleaning and replacing equipment , SEPA licences and annual
surveys.
95 98 101 104 107 95 98 101 104 107 95 98 101 104 107
Executive Director -
Kirsty Flanagan
RIS - Other Harbours -
Repairs/Maintenance
Ageing assets and cost increases for repair work required to be undertaken has resulted in a cost pressure
in this area and a forecast overspend  for 25-26 is anticipated in respect of this. This relates solely to
repairs and maintenance therefore it is not possible to capitalise these costs as assets are not being
enhanced.
130 135 140 145 150 260 270 280 290 300 325 340 355 360 375
Executive Director -
Kirsty Flanagan
Economic
Development
Resurfacing of taxiways at Oban Airport. All sections in need of repair date back to when the RAF operated
the airport and were not ungraded when the Council licensed the aerodrome. The surfaces are
deteriorating and as a result are producing loose stones and fragments of bitumen presenting a hazard
which could cause damage to aircraft therefore resulting in a potential claim against the Council.
100 0 0 0 0 100 0 0 0 0 100 0 0 0 0
Council Wide Council Wide General provision for unidentified Cost and Demand Pressures 0 250 500 750 1,000 0 500 1,000 1,500 2,000 0 1,000 2,000 3,000 4,000
TOTAL 4,302 4,468 4,702 5,001 5,300 4,496 4,966 5,432 5,986 6,540 4,644 5,713 6,664 7,713 8,772
Page 50

Page 51

POLICY SAVINGS OPTIONS - 2026-27 - NO STAFF IMPACT APPENDIX 4
Release of
Earmarkings
2025-26
Saving One-off
Saving FTE H/Count Saving FTE H/Count Saving FTE H/Count
COM01 Live Argyll Reduction to  Live Argyll management fee 
in 2026/27 by 15%. A 10% saving is
already in budget outlook as a deferred
saving agreed by Council in 25/26 - this
relates to an additional 5% only.
156 0.0 0 156 0.0 0 156 0.0 0
COM02 Catering Increase Charges for School Meals 50 0.0 0 50 0.0 0 50 0.0 0
COM08 Energy Efficiency Fund Remove Energy Efficiency Fund which will
reduce future works to reduce capacity for
the Council to reduce its carbon footprint
210
DEG01 Transformational Projects Stopping support to Strategic Events and
Festivals.  Applications for 2026-27 are
being presnted to P&R Committee in
February. If approved this saving would
not be deliverable in 2026-27 unless
alternative funding was identified on a one-
off basis.
90 0.0 0 90 0.0 0 90 0.0 0
DEG03 Regulatory Services Removal of Crown Estate Funding for
Redevelopment of 5-7 East Clyde Street
Helensburgh
270
DEG06 Transformational Projects Capitalisation of project management
costs within Rural Growth Deal PMO. This
has been incorporated within capital
planning assumptions within budget pack.
112 0.0 0 112 0.0 0 112 0.0 0
EDU06 Early Years Third Sector Grants Removal of Early Years Third Sector grants
allocated to non-statutory services.
0 0.0 0 40 0.0 0 40 0.0 0
FS04 Revenues and Benefits Devolved Empty Property Relief - Removal
of forecast underspend.
330
RIS01 Amenity Services 15% Increase in Fees and Charges for
parking
22 0.0 0 22 0.0 0 22 0.0 0
RIS02 Amenity Services 15% Increase in Fees and Charges for
Cemeteries and Crematorium (6% already
accounted for in budget outlook)
33 0.0 0 33 0.0 0 33 0.0 0
2028-29Ref Service Area Saving Summary 2026-27 2027-28
Page 51

Page 52

POLICY SAVINGS OPTIONS - 2026-27 - NO STAFF IMPACT APPENDIX 4
Release of
Earmarkings
2025-26
Saving One-off
Saving FTE H/Count Saving FTE H/Count Saving FTE H/Count
2028-29Ref Service Area Saving Summary 2026-27 2027-28
RIS07 Ports and Harbours Campbeltown Overtime to be covered by
Shipping Berthing Fees
35 0.0 0 35 0.0 0 35 0.0 0
Totals 480 330 498 0.0 0 538 0.0 0 538 0.0 0
Page 52

Page 53

POLICY SAVINGS OPTIONS - 2026-27 - STAFF IMPACT APPENDIX 4
Release of
Earmarkings
2025-26
Saving One-off
Saving FTE H/Count Saving FTE H/Count Saving FTE H/Count
CSS01 Customer and Engagement Team Close Service Points and Move all Phone
and Email Traffic to CSC
224 6.4 10 224 6.4 10 224 6.4 10
CSS02 Communications Remove part time Research and Insight
Officer post and also residual saving from
previously changing an LGE11 post to two
part time LGE10 posts.
38 0.5 1 38 0.5 1 38 0.5 1
CSS04 HR Refocus work and use of more digital
systems and processes that should save
staff time.  Also a small amount of savings
in non staffing budgets, e.g. training and
travel and subsistence.
35 0.76 2 191 TBC TBC 191 TBC TBC
DEG08 Development Policy and Housing Transfer costs to Strategic Housing Fund
for 2 staff working on the delivery of
housing.
147 2.0 2 147 2.0 2 147 2.0 2
EDU03 Early Years Remove 2 early years posts that are
vacant due to reducing rolls.
82 2.0 2 82 2.0 2 82 2.0 2
EDU04 Life Long Learning and Support Remove a 0.4fte Teacher Post at end of
current contract period.  This post
supported schools with English as an
Additional Language, inclusion, UNCRC
including Rights Respecting Schools. 
18 0.4 1 24 0.4 1 24 0.4 1
EDU05 Wellbeing, Inclusion and
achievement 
Post for wellbeing work comes to an end
July 2026.
46 1.0 1 74 1.0 1 74 1.0 1
EDU09 Early Years Teachers Removal of teacher time to every ELC
facility.
108 1.6 16 108 1.6 16 108 1.6 16
FS01 Revenues and Benefits Removal of two Benefits Posts 10 80 2.0 2 80 2.0 2 80 2.0 2
FS02 Revenues and Benefits Removal of one post from Council Tax
Admin Team
20 0.6 1 20 0.6 1 20 0.6 1
LRS04 Legal Services Removal of part time Senior Solicitor post
due to retirement 7 hours @ LGE12
14 0.2 1 14 0.2 1 14 0.2 1
LRS05 Legal Services Reduction in Solicitor LGE11 post by 14
Hours
25 0.4 0 25 0.4 0 25 0.4 0
2028-29Ref Service Area Saving Summary 2026-27 2027-28
Page 53

Page 54

POLICY SAVINGS OPTIONS - 2026-27 - STAFF IMPACT APPENDIX 4
Release of
Earmarkings
2025-26
Saving One-off
Saving FTE H/Count Saving FTE H/Count Saving FTE H/Count
2028-29Ref Service Area Saving Summary 2026-27 2027-28
LRS06 Legal Services Removal of Admin Post Currently Vacant 25 0.9 1 25 0.9 1 25 0.9 1
RIS03 Amenity Services Close, Sale or Transfer of Public
Conveniences
100 4.0 12 100 4.0 12 100 4.0 12
RIS04 Roads and Infrastructure Services Reduction in Administration Costs 36 1.0 1 44 1.0 1 44 1.0 1
RIS05 Amenity Services Removal of Amenity Service
Environmental Wardens
178 5.0 5 214 5.0 5 214 5.0 5
RIS06 Roads Winter Maintenance 10% Reduction in Winter Maintenance
Budget which brings us closer to the
average treatment routes for all Scottish
Authorities 
270 TBC TBC 270 TBC TBC 270 TBC TBC
RIS08 Parks Reduction to operational budget in parks
resulting in reduced level of service
88 3.0 3 106 3.0 3 106 3.0 3
RIS09 Street Sweeping 15% reduction to street sweeping budget
resulting in a reduced level of service
147 5.0 5 176 5.0 5 176 5.0 5
Totals 0 10 1,681 36.8 66 1,962 36.0 64 1,962 36.0 64
Page 54

Page 55

Classification: OFFICIAL
2026-27 BUDGET PREPARATION – SAVING OPTION 
Head of Commercial Services Ref: COM01
Service Delivery Area Live Argyll
Detail of Savings Proposal 
In 2025/26 a 10% reduction in Management fee was approved at the February 2025 Budget Meeting
but was deferred to this financial year. This totalled £0.311m and has been deducted from the
2026/27 management fee within the budget outlook. 
For 2026/27 it is proposed that a further 5% reduction is applied to the Management Fee totalling
£0.156m.  The total reduction to the management fee over the 2 year period 2025-2027 is therefore
£0.467m. 
The table below shows scenarios, service changes and balancing actions outlined by Live Argyll to
respond to the proposed Management Fee reduction:-
All scenarios / options listed in the table (above) will be required to be delivered to reach the
£0.467m target as outlined.   
A decision by the Live Argyll Board in 2025 to close a number of smaller libraries has been publicly
unpopular and has not been progressing in 2025/26.  This proposal supersedes that previous
decision.   
During January and February 2026, Live Argyll have been undertaking engagement with Live Argyll
Members and wider public relating to how communities may be affected by potential changes to
service provision relating to leisure, libraries, culture, halls, active schools and community learning
development.  Engagement has included online surveys, attendance at staff workshops and
community planning events. 
Saving
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
156 0 0 156 0 0 156 0 0 
Page 55

Page 56

Classification: OFFICIAL
2026-27 BUDGET PREPARATION – SAVING OPTION 
Head of Commercial Services and Education Service  Ref: COM2
Service Delivery Area  Increase Charges for School Meals
Detail of Savings Proposal 
Increase the charge payable for school meals by 6% taking the cost of a Primary Meal from £2.30 to
£2.45 and a Secondary School Meal from £2.40 to £2.55.  Based on current uptake this would
generate additional income of £50k. 
Due to the cost-of-living crisis and priority of protecting families there has been no annual increase
of chargeable school meals since 2021-22. 
There is a mixed picture nationally in terms of school meals provision and charging. A range of other
Council charges are:- West Dunbartonshire Council £3.19 for both Primary and Secondary,  East
Dumbartonshire Council £2.60 and £2.71, Highland Council £2.40 and £2.65, with North Lanarkshire
charging £3.40 and £3.45. 
There is also a balance to be struck between increasing the cost of a school meal whilst not wishing
to prompt the student to seek a meal outside of school.  Most high schools have alternative options
if prices are deemed to be excessive and therefore overall income could fall.   
A 6% increase in school meal charges could increase income by circa £50k. 
Saving 
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
50 0 0 50 0 0 50 0 0 
Page 56

Page 57

Classification: OFFICIAL
2026-27 BUDGET PREPARATION – SAVING OPTION 
Head of Commercial Services  Ref: COM8
Service Delivery Area  Energy Efficiency Fund - Carbon Reducing Projects
Detail of Savings Proposal 
Remove Energy Efficiency Fund Earmarking – One off Saving 
This would reduce ability for the Council to reduce its Carbon Footprint. 
Saving 
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
210 0 0 0 0 0 0 0 0 
Page 57

Page 58

Classification: OFFICIAL 
DEG - 2026-27 BUDGET PREPARATION – SAVING OPTIONS 
Head of Development and Economic Growth (DEG)  Ref: DEG01
Service Delivery Area  Transformational Projects
Detail of Savings Proposal 
Stopping of support of Strategic Events and Festivals 
Risk: Loss of support for key community/economic events across Argyll and Bute.  For example, the Cowal
Games, albeit this is a competitive fund. Loss of over £2m of economic impacts linked to this one event.  £9m
loss associated with all events albeit the council are part funders through this fund. 
Note that a paper asking for approval of applications in 2026-27 is being presented to Policy and Resources
Committee on 19 February 2026. If the recommendations in the paper are approved then this saving would not
be deliverable in 2026-27 unless alternative funding was identified on a one-off basis. 
Saving 
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
£90k 0 0 £90K 0 0 £90K 0 0 
Page 58

Page 59

Classification: OFFICIAL 
DEG - 2026-27 BUDGET PREPARATION – SAVING OPTIONS 
Head of Development and Economic Growth (DEG)  Ref: DEG03
Service Delivery Area   Regulatory Services
Detail of Savings Proposal 
Removal of Crown Estates funding allocated to redevelopment of 5-7 East Clyde Street, Helensburgh  
Note: £80K of Crown Estates funding to be retained to support ongoing works and costs associated with the
compulsory purchase, legal costs incurred in services and potential appeal, to fund ongoing maintenance to the
property to protect public safety and potentially to secure majority ownership of the site. 
Risks: 
1. Due to difficulties delivering this project due to multiple owners, legal issues and pursuing compulsory
purchase provisions, these monies will not be allocated within the next year. 
2. Future development could be supported by funding from the Strategic Housing Improvement Plan (SHIP)
and from ACHA
3. Full monies will not be available if the Council requires to involve formal powers to demolish the
property. This will fall to corporate budget/strategic housing fund
Saving  
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
270 0 0 0 0 0 0 0 0 
Page 59

Page 60

Classification: OFFICIAL 
Head of Development and Economic Growth   Ref: DEG06
Service Delivery Area   Transformational Projects
Detail of Savings Proposal 
There is the opportunity to capitalize the costs associated with the Rural Growth Deal (RGD) Project Officer and
Administrative and Finance Assistant posts.  Note that this funding cannot be taken from the capital grants
associated with the RGD as councils and key delivery partners must fund PMO costs in line with the deal
agreement.  Therefore, if this option is taken then capital funding would have to be identified within the capital
plan.   
Note that this saving has been incorporated within the capital planning financial assumptions in the Capital
Plan Update report within the budget pack, therefore if this saving was agreed it would not impact the capital
position further than what is already stated within the report. 
Saving  
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
112 0 0 112 0 0 112 0 0 
Page 60

Page 61

Classification: OFFICIAL
2026-27 BUDGET PREPARATION – SAVING OPTION 
Head of Education  Ref: EDU - 06
Service Delivery Area  Early Years – Third Sector Grant Funding
Detail of Savings Proposal 
Removal of Early Years Third Sector grants allocated to non-statutory services. This grant provides
essential funding support for partner providers delivering statutory services. 
The saving proposal relates only to the funding allocated to partners delivering non statutory
services. This will include Parent and Toddler Groups and school age childcare providers 
Saving 
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
0 0 0 40 0 0 40 0 0 
Page 61

Page 62

Classification: OFFICIAL
2026-27 BUDGET PREPARATION – SAVING OPTION 
Head of Financial Services  Ref: FS04
Service Delivery Area  Revenue and Benefits – Devolved Empty Property Relief 
Detail of Savings Proposal 
Empty Property Relief policy has been devolved to local authorities.  There is a 3-year Empty
Property Relief SG grant allocation of £608k in each of the years 2023-24 to 2025-26, with no
specific conditions.  An underspend in 2024-25 (£224k) was transferred to an earmarked reserve for
business support / economic development purposes.  A new Business Support Grants Scheme was
approved by council during 2025-26.  There may be an opportunity for 2025-26 awards (based on
current applications) to be managed from the existing available reserve balance as at 31 March
2025, with no further transfer to reserves from the 2025-26 underspend.   The forecast underspend
in 2025-26 is circa. £330k (New Empty Property Relief Policy costs + dedicated officer post circa.
£270k).  Members may wish to consider earmarking the forecast 2025-26 underspend of circa.
£330k to contribute to meeting the forecast 2026-27 budget gap. 
2025-26 saving carried forward and earmarked to contribute towards 2026-27 budget gap. 
Saving 
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
330 0 0 0 0 0 0 0 0 
Page 62

Page 63

Classification: OFFICIAL
2026-27 BUDGET PREPARATION – SAVING OPTION 
Head of Roads and Infrastructure  Ref: RIS01
Service Delivery Area  Fees and charges for parking
Detail of Savings Proposal 
RIS collects income on behalf of the council for On street parking £32,000 and Off street parking
£115,000 
Total £147,000 
The proposal would be to increase these fees and charges by 15%, generating additional £22,000 of
income. 
Saving 
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
22 0 0 22 X X 22 X XX 
Page 63

Page 64

Classification: OFFICIAL
2026-27 BUDGET PREPARATION – SAVING OPTION 
Head of Roads and Infrastructure  Ref: RIS02
Service Delivery Area  Fees and charges for bereavement services
Detail of Savings Proposal 
RIS collects income on behalf of the council Cemeteries £41,000 and Crematorium £322,000 
Total £363,000 
The proposal would be to increase these fees and charges by 15%, generating additional £33,000 of income (6%
already built into budget outlook). 
Some informal benchmarking with neighbouring Councils has taken place as summarised in the table below.   
Burials     
Local Authorites Adult New Lair
Adult
Interment
Ashes
New Lair
Ashes
interment Foundations
Argyll& Bute £1,239 £1,052 £225 £237 £205
Glasgow City £1,542 £1,148 £711 £338 £235
Stirling Council £1,580 £1,408 £546 £381 £408
Highland Coucil £935 £1,003 £658 £234 £183
East Dunbartonshire Council £1,321 £1,088 £676 £516 £439
West Dunbartonshire Council £1,361 £1,044 £1,029 £230 £287
Inverclyde Council £1,273 £1,182 £701 £197 £213
Average £1,322 £1,132 £649 £305 £281
%age difference between ABC and
Average 7% 8% 189% 29% 37% 
Crematoria  
Local Authorities Adult Cremation Direct Cremation
Argyll& Bute £1,034 £721.00
Glasgow City £886 £397
Stirling Council NIL NIL
Highland Council £1,003.00 £820
East Dunbartonshire Council NIL NIL
West Dunbartonshire Council £993.00 £553
Inverclyde Council £925.00 £492.35
Average £968 £597
%age difference between ABC and Average -10.54% -31.71% 
The information outlines that there is scope for increasing fees and charges relating to burials, however, ABC is
already the highest charging council for cremations and therefore it is suggested that Council may wish to only
focus on increases above inflation for burials.   
Page 64

Page 65

Classification: OFFICIAL
This demonstrates that, whilst there is scope for increasing fees and charges relating to burials, ABC is already
the highest charging council for cremations. Council would need to give consideration as to whether the fees
should be increased by 15% for both burials and cremations and the impact that may have.   
Saving 
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
Burial        
4 0 0 4 0 0 4 0 0
Cremation        
29 0 0 29 0 0 29 0 0 
Page 65

Page 66

Classification: OFFICIAL
2026-27 BUDGET PREPARATION – SAVING OPTION
Head of Roads and Infrastructure Services Ref: RIS07
Service Delivery Area Ports and Harbours
Detail of Savings Proposal
This saving proposes the introduction of two new charges for out of hours rope-handling services at
Campbeltown Harbour, specifically targeting commercial vessels. The new charges are
recommended to come into effect from 1 April 2026.
The charges will be applied each time a commercial vessel arrives at or departs from the harbour.
This ensures that all users of the service contribute to the costs associated with the provision of
rope-handling, particularly in instances where services are required outside normal working hours
or on public holidays.
By introducing these charges, the Council aims to align its operational practices with those of other
commercial ports within the region. This harmonisation is intended to ensure consistency across the
area and to enable the Council to recover costs incurred from providing rope-handling services
during periods that attract higher operational expenses.
It is anticipated that the implementation of these new charges will generate approximately £35,000
per annum in additional income for the Council.
Saving
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
35 0 0 35 0 0 35 0 0
Page 66

Page 67

Classification: OFFICIAL
2026-27 BUDGET PREPARATION – SAVING OPTION
Head of Customer Support Services Ref: CSS01
Service Delivery Area Customer Engagement Team
Saving Target Current 2025/26 Budget is £ 1,660k of which £201k is
uncontrollable (ICT and Blue Badge Contracts), leaving £1,459k
controllable. 15% of that would give a savings target of £219k
Detail of Savings Proposal (slightly amended following statutory consultations)
1. Close Service Points to walk in customers and move to an appointment only system,
retaining offices solely as statutory registration offices (which bring in £330kpa income) and
by appointment support and application processing hubs for vulnerable and digitally
excluded customers.
2. Move all phone and email traffic currently handled by CSPs into CSC, except emergency
backup. This would reduce initial customer service response standards, but they would still
be well within acceptable norms.
3. Surrender additional income expected from Ceremony fee increases mandated by Scotgov.
The above would:
• Allow a more efficient use of resources as currently circa 15% of the Customer Engagement
Team budget is spent servicing the needs of face-to-face customers and under 3% of all
customer interactions are done face-to-face. This is because officers need to be at counters
at defined times, even when there is little footfall. An appointment system allows a more
flexible allocation of resource, whilst still ensuring a supportive face to face service for
customers requiring it. 76% of all customer interactions are now done digitally and the
Contact Centre and appointment only Service Points will service the remainder.
• Allow us to reduce FTE in CSPs by the amounts noted below and would save £209,846k
• The balance of £9k would come from additional registration income as NRS will be increasing
marriage registration fees, which have been frozen for a number of years.
Service Point/CSC Current FTE Proposed
Reduction
Remaining
FTE
Average F2F
traffic per
Month FQ1-3*
Registration
Events 2024
& 2025
Campbeltown 2.7 0.7 LGE6 2.0 150 226 & 217
Dunoon 2.8 0.5 LGE6 2.3 137 454 & 460
Helensburgh 4.5 0.8 LGE6 3.7 202 803 & 767
Islay 2 0.4 LGE7
0.2 LGE9
1.4 36 110 & 101
Lochgilphead 3 1.0 LGE6 2.0 94 374 & 328
Mull 1.7 0.7 LGE6 1.0 46 107 & 113
Oban 3.5 0.2 LGE6 3.3 155 472 & 540
Rothesay 1.5 0.5 LGE6 1.0 111 182 & 170
Tiree 0.4 0.4 LGE7 0 3 23 & 25
CSC** 10.4 0.4 LGE6 10 N/A N/A
Total 32.5 4.8 LGE6/0.8
LGE7/0.2 LGE9
8 Headcount
26.7 933 2751 & 2721
* Includes walk-in and by appointment face to face customers (approx 6% are by appointment).
**CSC Reduction is from staff who have voluntarily adopted reduced flexible working hours.
Page 67

Page 68

Classification: OFFICIAL
Saving Calculation (Based on current salary templated costs +3.5% for 26/27 uplift):
Grade / Number SAVING
LGE6 4.8 FTE £170,592
LGE7 0.8 FTE £29,831
LGE9 0.2 FTE £9,423
Additional Ceremony
Income, Funeral Income
and Sundries
£14,000
Total Saving £223,846
Risks:
1. A more evolutionary transition of resources from face to face into digital development
resources had been planned and so taking the totality of efficiencies for budget savings
jeopardises the pace of digital transformation.
2. Moving from an on demand to an appointment based service does make it more difficult for
more vulnerable customers to readily access council services – as noted in the Integrated
Impact Assessment. Footfall is however now below 1000 a month across the CSP estate and
the proposal is not to entirely close offices (except Tiree which is already closed), but to
move to a more sustainable appointment only service. We also have a Community Service
Point offering following the successful pilot at Cove and Kilcreggan, which will be promoted
to encourage take up.
3. We will have less resilience in communities in the event of another large scale emergency
such as Covid.
Current Data Regarding Activity at Service Points and Other Contact Channels: 
Mediated transactions are those requiring a human agent input (phone, email, face to face)
Mediated transactions are just under 24% of the total from FQ1-3 and of the total just 3% are Face
to Face (14,990 transactions out of 485,286). However single customers often do multiple
transactions at each visit, so the number of customers visits (footfall) over FQ1-3 to all CSPs was
8,400 or 933 per month. An approximate cost per face to face customer visit is £24.34. (£1.92 for
digital and £3.96 for other mediated).
Saving
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
£224 5.8
FTE
8 £224* 5.8
FTE
8 £224* 5.8
FTE
8
• Assumes nil inflation and steady income from marriage ceremonies.
Page 68

Page 69

Classification: OFFICIAL
2025-26 BUDGET PREPARATION – SAVING OPTION
Head of Customer Support Services Ref: CSS02
Service Delivery Area Communications
Saving Target Controllable budget £312k. (15%)
(Staff = £295,098 / Other = £17,159)
Detail of Savings Proposal 
Immediate term – 11.25% of budget 
Remove part time LGE10 Research and Insight Officer post - £27,401
- No one single contact for producing area-wide updates on population statistics for the area,
however, we now have a new data hub and this new resource gives access to useful data
relating to the Argyll and Bute economy, cost of living, demography, and the most recent
population census.
- the Comms Team would reduce time spent on posting information to social media to create
time to collate/analyse social media data on what works (one week per month would have
fewer posts to use the planning/production time for this analysis instead as it helps shape
effective content)
- limited Argyll and Bute representation on council meetings about population stats
From staffing budget (no impact on staff) - £11,000
- This is the residual from changing a LGE11 post to two part time LGE10 posts
Longer term 
Budget is largely employee costs: Manager, Senior Comms Officer, 2 x Comms Officers, part time
graphic designer.
Currently looking into if/how AI or other technology opportunities could help reduce the time we
spend on various tasks, but if reductions are required in future, knowing how best to make them will
overall depend on priorities for the council and what most needs comms support. 
Saving
2025-26 2026-27 2027-28
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
38 0.5 1 38 0.5 1 38 0.5 1
Page 69

Page 70

Classification: OFFICIAL
2026-27 BUDGET PREPARATION – SAVING OPTION
Head of Customer Support Services Ref: CSS04
Service Delivery Area Human Resources and Organisational Development
Saving Target  15% of controllable budget £365, 188
Non controllable budget includes corporate contracts/ Systems
and social work training budget which is managed by the social
work training board and there are currently proposals to remove
it from the HROD budget and transfer it to social work
Detail of Savings Proposal
The purpose of the HR and OD team is to ensure employee experiences are positive and that the
council as an employer creates an environment where employees can thrive and deliver their best
work. 
Some of the risks associated with reducing the level of service provided by the HR and OD team
include:
- Increasing sickness absence rates and cost of sick pay
- Increasing litigation and cost of legal processes/settlements
- Widening the capacity and skills gap to support rapid transformation across services
The HR and OD team have digital transformation projects in progress which are set to transform the
way in which employees and managers access information, process data and manage the
employment relationship.  Additionally, a planned programme of savings linked to this, and a
refocussing of OD implemented in 2024 has been identified with £45k already delivered in 25/26
and another £105k planned for delivery over the course of 26/27 and 27/28.
On request for a review of potential savings the following increased savings (inclusive of already
planned savings) are being proposed. Calculations include additional 7% pay award on current
salary template costings
In 2026/27, it is proposed to remove 0.76 FTE in relation to a reduction in post hours on two SLGE 6
posts in the HR Operations Teams on a recurring basis totalling £10,000 and £25,000 on a recurring
basis in non-staffing savings from various budgets including additional reduction in training budget,
travel and subsistence etc delivering a total recurring saving of £35,000.
In 2027/28, an additional proposed reduction of 1.39 FTE in relation to the removal of a 0.5 FTE
SLGE 9, removal of a 0.74 SLGE 6 and a 0.15 FTE reduction in hours for a SLGE 9 on a recurring basis
totalling £61,000 and £95,000 on a recurring basis in relation to further savings based on review of
realised outcomes from HROD digital project and ongoing refocussing OD activities. This will
generate a further saving of £156,000 in addition to the £35,000 recurring from 2026/27 bringing
the cumulative total to £191,000.
Future savings potential is currently unknown although exploration of shared service arrangements
for some HR and OD activities over the next two years at national level and via the ongoing
exploration of a Single Authority Model could present opportunities for efficiencies and economies
of scale.
Page 70

Page 71

Classification: OFFICIAL
Saving
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
35 0.76 2 191 TBC TBC 191 TBC TBC
Page 71

Page 72

Classification: OFFICIAL
Head of Development and Economic Growth Ref: DEG08
Service Delivery Area Development Policy and Housing
Detail of Savings Proposal
Propose to transfer salary costs to the Strategic Housing Fund of staff who are currently working almost entirely
on projects relating to the delivery of housing.
Two members of staff are identified who currently lie outwith the Development Policy and Housing team but are
currently working under the direction of the Development Policy and Housing Manager on housing related tasks. 
Transferring the salary costs of these staff to the SHF provides the equivalent saving to the Council.
The Corporate Support Manager, currently residing within the Chief Executives Service is working full time on
housing delivery issues.  This post is an SLGE13, and the salary mid-point for 26/27 including Oncosts is
£77,897.
The Arc Regeneration Project Manager, currently residing within DEG is currently working almost full time on the
delivery of housing related issues, this specifically involves the development of new short term let planning
control areas, the development of Phase 4 at Dunbeg, and contributing to other housing delivery issues
including the Oban Strategic Development Framework, and Ganavan footpath improvements.  The post is an
SLGE12, and the salary mid-point for 26/27 including Oncosts is £69,149.
NB:  There is an assumption that the current working arrangements / areas of focus, are continued for this
arrangement to make sense.  It is recognised that the current staff structure and job titles do not neatly reflect
the ongoing operational arrangements.  It may be necessary to consider a re-structure to make this
arrangement permanent, but that will of course require consultation with HR, the employees involved, and
potentially creation of new posts with new job evaluations.  This would be a medium-term solution if required. 
The Arc Regeneration Manager could alternatively be funded by the Lorn Arc TIF funding, however this would
need to be carefully considered in terms of the ability of the TIF scheme to finance the proposed infrastructure
developments going forwards.  Ten years of the Arc Regeneration Project Manager costs would equate to
£778,970 plus any inflationary costs and this is a significant amount in terms of TIF expenditure.
Saving
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
147 2 2 147 2 2 147 2 2
Page 72

Page 73

Classification: OFFICIAL
2026-27 BUDGET PREPARATION – SAVING OPTION 
Head of Education  Ref: EDU - 03
Service Delivery Area  Early Years
Detail of Savings Proposal 
Remove 2 Early Years Lead posts which are not required due to reducing ELC rolls in some areas.
These posts are currently vacant, therefore no impact on current staffing. 
Risk is, if Scottish Government further expands Early Learning and Childcare entitlement the service
may not have the capacity to support delivery. 
Saving 
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
82 2 2 82 2 2 82 2 2 
Page 73

Page 74

Classification: OFFICIAL
2026-27 BUDGET PREPARATION – SAVING OPTION 
Head of Education  Ref: EDU - 04
Service Delivery Area  Lifelong Learning and Support
Detail of Savings Proposal 
Remove a 0.4fte Teacher Post at end of current contract period.  This post supported schools with
English as an Additional Language, inclusion, UNCRC including Rights Respecting Schools. 
With the legislation now fully in place, and schools understanding their responsibilities along with all
schools now on the Rights Respecting School Journey, capacity has been created within the system. 
These responsibilities will sit with current permanent posts and this temporary post will not be
required from June 26. 
Saving 
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
18 0.4 1 24 0.4 1 24 0.4 1 
Page 74

Page 75

Classification: OFFICIAL
2026-27 BUDGET PREPARATION – SAVING OPTION 
Head of Education  Ref: EDU - 05
Service Delivery Area  Wellbeing, Inclusion and achievement
Detail of Savings Proposal 
Principal teacher of wellbeing post which has been developing the work from an education
perspective to enable the delivery of the single point of access for accessing support for
neurodivergent children young people and their families. 
This temporary post will have delivered on this work and will come to an end in July 2026.  Part
saving in 2026-27 and full saving from 2027-28. 
Saving 
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
46 1 1 74 1 1 74 1 1         
Page 75

Page 76

Classification: OFFICIAL
2026-27 BUDGET PREPARATION – SAVING OPTION 
Head of Education  Ref: EDU - 09
Service Delivery Area  Early Years Teachers
Detail of Savings Proposal 
The service currently allocates teacher time to every ELC including partner providers. Since the
development of 1140 hrs the EY workforce increasingly includes graduate practitioners and highly
skilled practitioners. 
As a result, the service can offer up the equivalent of 1.66 FTE Teacher Posts from our smallest
settings where the adult child ratio is already very good. 
Saving 
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
108 1.66 15 108 1.66 15 108 1.66 15 
Page 76

Page 77

Classification: OFFICIAL
2026-27 BUDGET PREPARATION – SAVING OPTION 
Head of Financial Services  Ref: FS01
Service Delivery Area  Revenues and Benefits - Benefits
Detail of Savings Proposal 
Opportunity through managed migration to Universal Credit from Housing Benefit to release 2 FTE
(1 SLGE9 and 1 SLGE6) from process efficiencies and increased productivity - 1 post vacant from
November 2025 (SLGE6), the other would require to be made redundant (SLGE9 expected to be
voluntary). 
Trade Union consultation has taken place, targeted voluntary redundancy.  Potential redundancy
cost implications (expected to be minimal). 
2025-26 part year saving from November 2025 (£10k) carried forward and earmarked to contribute
towards 2026-27 budget gap. 
Saving 
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
90 2 2 80 2 2 80 2 2 
Page 77

Page 78

Classification: OFFICIAL
2026-27 BUDGET PREPARATION – SAVING OPTION 
Head of Financial Services  Ref: FS02
Service Delivery Area  Revenue and Benefits – Council Tax Admin
Detail of Savings Proposal 
Opportunity to secure efficiency savings from within Council Tax Admin team.  A reduction of 0.6
FTE SLGE6 post proposed.  (Long term sickness absence currently being managed from within
existing resources.)  This post would require to be made redundant. 
Trade Union consultation has taken place, targeted voluntary redundancy.  Potential redundancy
cost implications (expected to be minimal). 
Saving 
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
20 0.6 1 20 0.6 1 20 0.6 1 
Page 78

Page 79

Classification: OFFICIAL
2026-27 BUDGET PREPARATION – SAVING OPTION 
Head of Legal and Regulatory Support  Ref: LRS04
Service Delivery Area  Legal Services
Detail of Savings Proposal 
Removal of Senior Solicitor post. Postholder was on phased retirement and finished December
2025. 
Saving 
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
14 0.2 1 14 0.2 1 14 0.2 1 
Page 79

Page 80

Classification: OFFICIAL
2026-27 BUDGET PREPARATION – SAVING OPTION 
Head of Legal and Regulatory Support  Ref: LRS05
Service Delivery Area  Legal Services
Detail of Savings Proposal 
Reduction in Solicitor LGE11 post by 14 hours. Following a period of special leave the postholder has
requested a flexible working arrangement with a move to 21 hours. 
Saving 
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
25     0.4 0 25 0.4 0 25 0.4 0 
Page 80

Page 81

Classification: OFFICIAL
2026-27 BUDGET PREPARATION – SAVING OPTION 
Head of Legal and Regulatory Support  Ref: LRS06
Service Delivery Area  Legal Services
Detail of Savings Proposal 
We propose to review the current clerical support hours as this post is currently vacant. 
Saving 
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
25 0.9 1 25 0.9 1 25 0.9 1 
Page 81

Page 82

Classification: OFFICIAL
2026-27 BUDGET PREPARATION – SAVING OPTION 
Head of Roads and Infrastructure  Ref: RIS03
Service Delivery Area  Public conveniences
Detail of Savings Proposal 
Argyll and Bute Council operates 57 dedicated public conveniences across one of the largest and
most rural local authority areas in Scotland. The facilities and services have consistently been
highlighted by communities as an important and valued part of local infrastructure - particularly in
areas that support tourism, long-distance travel, and ferry-based connectivity. However, they are
not a statutory service.
The public convenience estate has a projected net operating cost of just over £0.331m for 2025-26.
This includes staffing, utilities, supplies, and income offsets.
This proposal is aimed at withdrawing council involvement in toilet facilities, whether by closure,
sale or community asset transfer. 
Proposals will require significant engagement with stakeholders prior to implementation to identify
where sale or transfer could take place and therefore a target saving of £100k has only been
assumed at this stage.  
There has been investment in facilities, for example on Iona, as part of the harbour upgrades at
these locations.
However, from local knowledge, and from feedback from elected members and communities, many
of our facilities are in poor condition. It would take a signficant amount of capital to bring all the
toilet facilities up to an acceptable standard.  
The financial challenges facing the council mean that we need to review existing provision and
identify how we can reduce expenditure by either
• Introducing alternative service provision (community asset transfer / sale / lease to local
business / comfort scheme), or
• Where this is not possible, agree which facilities to close. 
This has been identified through the review of Roads and Infrastructure in the Asset Management
workstream.
It is anticipated that any proposals to change existing service provision will result in a negative
response from our stakeholders, especially those with particular health conditions
A comprehensive comms strategy outlining the reasons for the proposals, the alternatives being
considered (Community Asset Transfer, partnerships with local businesses, increased use of existing
publicly accessible council buildings).
Identifying capacity within the council to support communities to take on the running of public
conveniences through sale, Community Asset Transfers, licenses to occupy, or leases.  
Page 82

Page 83

Classification: OFFICIAL
The proposals are at a very early stage, and the mitigations mentioned above have not yet been
developed. Public engagement without these mitigations in place will be extremely problematic.
A target saving of £100,000 has been entered for financial year 2026-27, however, as noted above,
the proposals are at an early stage and if Council are minded to accept this saving, it will be a target
saving with further proposals and detail brought forward to Council during the year.  There will
remain a risk that the saving couldn’t be delivered in full in year, however, every attempt would be
made to deliver it.  
Saving 
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
100 4.0 Circa 12 100 4.0 Circa
12
100 4 Circa
12 
Page 83

Page 84

Classification: OFFICIAL
2026-27 BUDGET PREPARATION – SAVING OPTION 
Head of Roads and Infrastructure  Ref: RIS04
Service Delivery Area  Administration costs
Detail of Savings Proposal 
Roads and Infrastructure Services currently have a budget of £366,000 for admin costs. This
proposal would reduce the admin resource by 1 x SLGE8 post (1 FTE), releasing a saving of £36k in
2026-27 (part year), rising to £44k from 2027-28 (full year). 
Saving 
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
36 1 1 44 1 1 44 1 1 
Page 84

Page 85

Classification: OFFICIAL
2026-27 BUDGET PREPARATION – SAVING OPTION 
Head of Roads and Infrastructure  Ref: RIS05
Service Delivery Area  Amenity Service Wardens
Detail of Savings Proposal 
The proposal involves the removal of the Amenity Service Environmental Wardens. This will require
the downscaling or stopping of our environmental enforcement activity, or the reconfiguration of
enforcement activity within Roads and Infrastructure Services, e.g parking enforcement staff
becoming more involved in environmental enforcement, transfer of some enforcement activity to
regulatory services.
This will involve the removal of 5 posts at SLGE7, providing a saving of £178k in 2026-27 (part year),
rising to £214k from 2027-28 (full year). 
The activities currently carried out by the wardens are as follows
• Removal of abandoned vehicles
• Fly tipping investigation and enforcement
• Commercial waste enforcement
• Dog fouling enforcement and education
• LEAMS inspections
• Management of the assisted pull out service
• Pest control
• Liaison with traveller encampments 
Saving 
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
178 5 5 214 5 5 214 5 5 
Page 85

Page 86

Classification: OFFICIAL
2026-27 BUDGET PREPARATION – SAVING OPTION 
Head of Roads and Infrastructure  Ref: RIS06
Service Delivery Area  Roads Winter Maintenance
Detail of Savings Proposal 
The budget for winter maintenance for 2025/26 is £2.662m. This proposal would involve a
reduction in winter maintenance by 10%, delivering a saving of £0.270m. This will bring us closer to
our comparator rural councils, and also mitigate against any reduction in the capital budget for road
resurfacing. 
A report went to EDI Committee on 11 September and the Committee endorsed that a further
review of the winter maintenance policy is undertaken prior to the 2026/27 winter maintenance
season which includes a review of the total percentage of the road network that is currently treated
and, recognising this is 10% higher than the average for the rural group authorities, whether
efficiencies on this can be achieved. With a report to Committee during early summer 2026. 
Reduction in staffing cannot be confirmed at this stage until review is carried out.  The saving at this
stage represents a target saving that will be further refined as part of the review to be reported
during 2026. 
Saving 
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
270 tbc tbc 270 tbc tbc 270 tbc tbc 
Page 86

Page 87

Classification: OFFICIAL
2026-27 BUDGET PREPARATION – SAVING OPTION 
Head of Roads and Infrastructure  Ref: RIS08
Service Delivery Area  Parks
Detail of Savings Proposal 
The total operational budget for Parks across Argyll and Bute is £989,176. This does not include
£248,300 HQ overhead allocation. 
This proposal is to reduce expenditure by 15% where there is sufficient capacity to do this, i.e. not
on small islands where budget is part of a post – Islay, Coll, Colonsay. 
The saving would equate to 3 FTE at grades SLGE4 and SLGE5 which would be achieved by reducing
1 FTE in each of the Mid Argyll, Lorn and Helensburgh and Lomond areas. Activities reduced would
include seasonal bedding and grass cutting.  
The staffing levels in these areas is currently as follows  
Mid Argyll - 4FTE
Oban and Lorn – 5FTE
Helensburgh and Lomond - 9FTE  
The parks establishment on Bute is only 2.3FTE (5 employees), which was considered to be too
small to reduce any further. 
Saving 
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
88 3 3 106 3 3 106 3 3 
Page 87

Page 88

Classification: OFFICIAL
2026-27 BUDGET PREPARATION – SAVING OPTION 
Head of Roads and Infrastructure  Ref: RIS09
Service Delivery Area  Street Sweeping
Detail of Savings Proposal 
The operational budget for street sweeping across Argyll and Bute is £895k. This proposal would see
the budget reduced by £147k in 2026-27 (part year), rising to £176k from 2027-28 (full year),
through a reduction of 5 FTE across Helensburgh and Lomond, Lorn, Mid Argyll and Bute and Cowal. 
Saving 
2026-27 2027-28 2028-29
£000 FTE H/Count Cumulative
£000
FTE H/Count Cumulative
£000
FTE H/Count
147 5 5 176 5 5 176 5 5 
Page 88

Page 89

APPENDIX 5
SERVICE SUMMARY OF BUDGET POSITION 2026-27
Department Service 2025-26
Budget
Other Base
Budget
Adjustments
Settlement
Commitments
Updated
Base Budget
Employee
Budget
Changes
Non-Pay
Inflation -
Inescapable
Cost and
Demand
Pressures
Live Argyll
Management
Fee
Adjustment
Measures to
Balance the
Budget
Social Work
Pressures
Absorbed by
HSCP
Adjustment
to IJB
Allocation
2026-27 Draft
Budget
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Council Departments:
Chief Executive's Unit Chief Executive 1,014 0 0 1,014 218 0 0 0 (25) 0 0 1,207
Executive Director (Douglas Hendry) Executive Director (Douglas Hendry) 56 0 0 56 73 0 0 0 0 0 0 129
Executive Director (Douglas Hendry) Head of Commercial Services 10,565 (20) 0 10,545 1,387 204 0 (193) (546) 0 0 11,397
Executive Director (Douglas Hendry) Head of Education 126,151 0 162 126,313 7,568 494 1,064 0 (1,305) 0 0 134,134
Executive Director (Douglas Hendry) Head of Legal and Regulatory
Support
21,604 0 0 21,604 692 431 198 0 (335) 0 0 22,590
Executive Director (Kirsty Flanagan) Executive Director (Kirsty Flanagan) (440) 0 0 (440) 85 0 0 0 0 0 0 (355)
Executive Director (Kirsty Flanagan) Head of Customer Support Services 9,638 0 0 9,638 1,180 122 177 0 (569) 0 0 10,548
Executive Director (Kirsty Flanagan) Head of Development and Economic
Growth
8,531 0 0 8,531 1,398 89 180 0 (653) 0 0 9,545
Executive Director (Kirsty Flanagan) Head of Financial Services 7,217 0 121 7,338 828 50 299 0 (160) 0 0 8,355
Executive Director (Kirsty Flanagan) Head of Roads and Infrastructure
Services
38,150 2,810 27 40,987 3,258 683 2,323 0 (1,824) 0 0 45,427
Non Departmental: 0 0 0 0 0
Joint Boards Joint Boards 1,525 0 0 1,525 0 47 255 0 0 0 0 1,827
Other Operating Income & Expenditure Elected Members 1,502 0 0 1,502 142 13 0 0 0 0 0 1,657
Other Operating Income & Expenditure Sundry Services 2,115 (104) 0 2,011 (42) 53 0 0 (100) 0 0 1,922
Other Operating Income & Expenditure Unfunded Pensions 1,554 0 0 1,554 0 0 0 0 0 0 0 1,554
Non Controllable Costs: 0 0 0 0 0
Insurances 2,757 0 0 2,757 0 491 0 0 0 0 0 3,248
Non Domestic Rates 5,469 0 0 5,469 0 (189) 0 0 0 0 0 5,280
Apprenticeship Levy (Council) 632 0 0 632 35 0 0 0 0 0 0 667
Capital Charges (loans charges) 8,258 95 0 8,353 0 0 0 0 (619) 0 0 7,734
0 0 0COUNCIL TOTAL 246,298 2,781 310 249,389 16,822 2,488 4,496 (193) (6,136) 0 266,866
Health and Social Care Partnership:
Social Work Chief Officer (2,310) 0 3,292 982 50 0 0 0 0 (5,208) 6,286 2,110
Social Work Acute and Complex Care 59,026 0 153 59,179 2,627 0 0 0 0 0 0 61,806
Social Work Children & Families 7,808 0 0 7,808 802 0 0 0 0 0 0 8,610
Social Work Health and Community Care 16,951 104 0 17,055 1,659 0 0 0 0 0 0 18,714
Social Work Strategic Planning and Performance 516 0 0 516 72 0 0 0 0 0 0 588
0 0SOCIAL WORK TOTAL 81,991 104 3,445 85,540 5,210 0 0 0 0 (5,208) 6,286 91,828
Rounding
TOTAL 328,289 2,885 3,755 334,929 22,032 2,488 4,496 (193) (6,136) (5,208) 6,286 358,694
Funding:
Scottish Government Funding 275,901
Council Tax Income 75,106
Saving options funded by existing earmarked reserves 950
Savings options funded by expected 2025-26 underspends to be earmarked 540
Transfer from reserves 6,197
OVERALL FUNDING SURPLUS / (GAP) 0
Page 89

Page 90

Appendix 6
FUNDING REQUESTS 
1. Introduction 
1.1 Funding requests have been received to be considered as part of the Budget
as outlined below.   
2 Argyll and Isles Tourism Cooperative (AITC) 
2.1 Argyll & Isles Tourism Cooperative (AITC) seeks continued investment of
£75,000 from Argyll and Bute Council to deliver the 2026/27 destination
marketing programme, enabling a scale of activity that maximises economic
return from a sector that is critical to local employment, rural communities and
supply chains, yet remains operationally fragile. Funding at this level allows
AITC to move beyond core visibility and deliver a more ambitious, fully
integrated programme focused on extending the season, spreading visitors
across the destination where capacity exists, strengthening national and
international reach, and providing enhanced support to tourism businesses
navigating rising costs, transport challenges, and policy change 
2.2 Council support, combined with membership income and external grants, has
enabled AITC to deliver its strongest ever marketing reach in 14 years,
demonstrating value for money from Council investment through shared,
destination-wide reach that individual businesses could not achieve alone 
2.3 The proposed 2026/27 programme focuses on extending the season,
spreading visitors responsibly across the destination, and increasing economic
yield, in line with national tourism policy. Activity will continue to be data-led,
using VisitScotland visitor insights to target high-value leisure markets,
including older travellers, families, international visitors, intergenerational
groups, and experience-seeking younger adults 
2.4 Effective design of a Visitor Levy for Argyll & Bute will depend on meaningful
industry representation to ensure the scheme is transparent, proportionate,
compliant and workable across a geographically large, rural destination with a
diverse accommodation portfolio. Continued support for AITC enables a
consistent, informed point of engagement between the Council and the tourism
sector, helping to identify practical impacts, mitigate unintended consequences
and build business confidence and compliance. 
2.6 The £75,000 Argyll and Bute Grant is anticipated to be apportioned as follows: 
ACTIVITY BUDGET OUTCOMES
PR, media – destination
positioning / print
5,000 • Reach new audiences.
Travel Trade Activity 5,000 • Reach new audiences.
Page 90

Page 91

Bloggers, Vloggers,
Influencers
10,000 • Reach new audiences.
• Extend the season.
Paid social promotion 2,500 • Boost marketing reach
across all campaigns.
New format, license-free
photography and video
5,000 • Assets that can be shared
with Visit Scotland, A&BC
& and AITC Members.
SEO Copywriting and new
content development
10,000 • Insight-based new content
across all Wild About
Argyll & Love Oban areas.
Integrated, data-led
destination campaigns
aligned to agreed visitor
trends & requirements
32,500 • Data-based campaigns
positioning Argyll against
key visitor trends.
Business support initiatives 5,000 • Continuation of skill
development for member
businesses.
TOTAL £75,000 
2.7 The request is for funding of £75,000 and further information related to this
request has been emailed to all Members on 12 February 2026.  It is
recommended that Council consider approving this request of £75,000 and
identify how this will be funded. 
3 Culture, Heritage and Arts Assembly, Argyll and Isles (CHARTS) 
3.1 The Culture, Heritage and Arts Assembly, Argyll and Isles (CHARTS), is
requesting £95,000 of financial support from Argyll and Bute Council for the
year 2026-27 which will secure critical strategic development activity. This will
include to enable the continued and complex management of Council owned
assets/collections, which has included very successful methodologies to
date. CHARTS will also increase its support to professional practitioners,
culture venues and communities addressing a breadth of demographic issues
faced, through being enabled to robustly upgrade the capabilities of our
website with new digital technologies fit for strengthened, diverse and
dynamic communication, empowering members and better matching need
with resource. 
3.2 Since 2020, CHARTS has generated an income in excess of £1.8m for the
culture sector, building on a total of £400,000 support from Argyll and Bute
Council across the same period. This demonstrates significant return on
Council investment that has enabled CHARTS to continue its successful
project delivery and grow reputation for the region. 
3.3 The Board recognises that this request to the Council is higher than was able
to be granted last year but it remains imperative that CHARTS upgrades its
website capabilities as key function to sustaining the sector, as its original
website operations system funded by the Council in Place Partnership with
Creative Scotland (2019), is neither suitable nor secure to assist the
Page 91

Page 92

organisation in generating increased income to help sustain the sector. As a
charitable organisation with no physical home, its website is the virtual centre
for all levels of communication. Reliant on grant aid, we have found funding
for websites specifically difficult to access and the Board is sees this as a
priority as the organisation develops in order to become more sustainable
with plans to develop ecommerce and our visitor offer. 
3.4 Delivery plans for 26/27 will continue to address challenging demographic
need and align with the ambitions of Refresh, Argyll and Bute Council’s
Economic Strategy (2024 – 2034). With a focus on partnership and
collaboration across all areas of work, CHARTS delivers across four strategic
key pillars: People, Place, Planet and Prosperity and the organisation
develops creative approaches to attract interest in the region to secure
investment. As a Placemaking organisation, CHARTS helps build the profile
of the region as an attractive place to live and work. The organisation
continually addresses challenges presented by rural poverty and deprivation
including isolation and the decline in the economically active population,
increasing engagement and work opportunities and building workforce skills
for our members and stakeholders. CHARTS attracts highly experienced staff
to project management roles, and promotes equal access to educational
opportunity, project commissions and awards, supporting economic goals
that help to sustain cultural businesses and creative ambition. 
3.5 CHARTS purpose is to work towards a sustainable future for the important
culture, heritage and arts business sectors which has been identified as a key
economic driver with real growth potential. The scope of CHARTS current
work and strategic plans offer wide-ranging impact for skills development,
supporting young people and other sectors such as tourism and food and
drink, which we have been able to demonstrate across recent years through
collaborations and commissioning. Our work not only aligns with a key aim of
the Council’s Refresh, Economic Strategy 2024-2034, but also other key
national and local government strategies including the Visitor Economic
Regional Growth Strategy, the Argyll and Isles Strategic Tourism Partnership
Visitor Economy Recovery and Growth Strategy, and the Argyll and Bute
Gaelic Language Plan to support the future sustainability of Argyll and Bute’s
heritage and creative industries. Across recent years CHARTS impact to the
care and protection of critical council owned heritage assets, has been
substantial including for the Argyll Collection and Campbeltown Museum
Collection, both of which have received support from Museums Galleries
Scotland in the past 12 months. 
3.6 The request is for funding of £95,000 and further information related to this
request has been emailed to all Members on 12 February 2026.  It is
recommended that Council consider approving this request of £95,000 and
identify how this will be funded. 
4 MacTaggart Leisure Centre, Islay 
4.1 MacTaggart Leisure Centre on Islay has benefitted from a £30,000 uplift in their
Service Level Agreement payment over the last 3 years.  Without this uplift it is
Page 92

Page 93

unlikely that the business would have continued to remain open for the
communities of Islay and Jura. 
4.2 Islay and Jura Community Enterprise Ltd have written once again requesting
an uplift of £30,000 for 2026-27.  There continues to be financial pressures
relating to utilities, chemicals and payroll costs. Electricity costs alone have
increased by £9,000 from last year which has had a negative impact on the
Centre. 
4.3 The Centre are also going into another year with the Distillery waste heat pipe
broken, resulting in much higher energy costs for oil. The engineer working on
this fix has advised that it is not a quick fix and although they are in continual
contact with them it is taking some time to go through the corporate channels.   
4.4 The Board of Directors are taking steps to try and further reduce energy costs,
looking at feasibility for wind power and procurement of energy suppliers. 
4.5 In addition to the request for £30,000, which is critical to keeping the Centre
open, engagement with Council officers has taken place in respect of the
ongoing SLA and desire to review/update the agreement to offer a more
sustainable solution. In the view of MacTaggart Leisure, achieving parity with
other community pools would require increasing the payment to between
£60,000 and £70,000, rather than the £30,000 initially requested. However,
these discussions are ongoing, and forecasts are to be equitably reviewed.   
4.6 Officers believe it would be beneficial to review the Service Level Agreements
(SLAs) for the Community Pools to help establish a sustainable long-term
funding position. This approach should reduce the need for additional in-year
funding requests and prevent situations where the SLA payment is followed by
separate funding applications. It would also support a clear and consistent
method for managing annual increases. 
4.7 It is recommended that Council consider approving the initial request of
£30,000, identify how this will be funded and instruct officers to review the
Community Pools SLAs during 2026–27. Officers would then report back to
Council later this year with proposals for a future approach that could be
implemented from 2027–28. 
Page 93

Page 94

This page is intentionally left blank

Page 95

ARGYLL AND BUTE COUNCIL COUNCIL
FINANCIAL SERVICES 25 FEBRUARY 2026
0BREVENUE BUDGET 2026-27
1BFEES AND CHARGES  
1 EXECUTIVE SUMMARY 
1.1 This report provides Members with information in relation to fees and charges for
2026-27. 
1.2 The Council raises fees and charges for a number of services it delivers, and a
review of the level of fees and charges is carried out each year. 
1.3 The general increase to fees and charges is proposed at 6% for 2026-27.  A 6%
increase was applied in years 2023-24, 2024-25 and 2025-26 and a 3% increase
each year between 2017-18 and 2022-23. 
1.4  There are some exceptions to the general inflationary increase which are outlined
within the report at paragraph 3.2.2.  There are also charges where no inflationary
increase has been applied, noted in paragraph 3.5, and charges where the rate is
set by others, noted in paragraph 3.6.  The total of the general inflationary
increase plus the exceptions would equate to additional income of £0.440m.   
1.5 Harbour Fees have been increased by 8%. This 8% increase is ring fenced to
fund asset improvement and sustainability within the piers and harbours. This is
estimated to generate additional income of £0.748m. No general inflationary
increase has been proposed for piers and harbours dues to ensure that the
service is cost neutral. 
1.6 New fees and charges which are being introduced for 2026-27 are itemised in
section 4.
 Early Years Charges – non-statutory provision (see 4.1)
o under 2 years old
o 2 to 3 years old
  Kerbstone full inscription flat rate
o Previously was charged per letter
 Cremation Services introduction of music, slideshows, tributes etc
o Detailed line by line in section 4.1
 Charges for staff transporting cycles and e-cycles on/off Lismore Ferry
o Includes safely securing them onboard 
1.7 Building Warrant fees are provided by Scottish Government. In discussion with
the service it has been agreed the average increase in fees is estimated to be
7%, resulting in additional income of £0.077m. This additional income will be
matched with additional expenditure incurred in providing the service. 
1.8 Increases to the fees and charges for the following activities are proposed as
budget savings:
 School meals charges
Page 95 Agenda Item 2b

Page 96

 Parking charges
 Cemetery and Crematorium charges
 Out of hours rope handling charges for commercial vessels arriving and
departing at Campbeltown Harbour 
Page 96

Page 97

ARGYLL AND BUTE COUNCIL COUNCIL
FINANCIAL SERVICES 25 FEBRUARY 2026
2BREVENUE BUDGET 2026-27
3BFEES AND CHARGES  
2. INTRODUCTION 
2.1 This report provides Members with information in relation to fees and charges for
2026-27. 
3. DETAIL 
3.1 The Council raises fees and charges for a number of services it delivers, and a
review of the level of fees and charges is carried out each year.  Appendix 1 to
this report contains the full list of fees and charges for each service and the
following paragraphs summarise the main changes.   
3.2 General Inflationary Increase 
3.2.1 The general increase to fees and charges is proposed at 6% for 2026-27.  A 6%
increase was applied in years 2023-24, 2024-25 and 2025-26 and a 3%
increase each year between 2017-18 and 2022-23 
3.2.2 There are a few exceptions to the standard inflationary increase, and these are
noted in the table below: 
Description Increase Reason for Increase
Funeral ceremonies 20% Right-sizing of charges as no increase
carried out since introduced but
relevant expenditure has risen.
Skips - Commercial
Tipping Charge (Tiree
only)
4% Charges based on assumed weights
and vehicle size as no weighbridge.
Parking 15% Proposed savings increase for 2026-27 
3.2.3 The total impact of the general inflationary increases and those in the table
above equates to an increase in income of £0.440m. 
3.3 Piers and Harbours 
3.3.1 Harbour Fees have been increased by 8%. This 8% increase is ring fenced to
fund asset improvement and sustainability within the piers and harbours. This is
estimated to generate additional income of £0.748m. No general inflationary
increase has been proposed for piers and harbours dues to ensure that the
service remains cost neutral. 
Page 97

Page 98

3.4 Social Work Charges 
3.4.1 The 2026-27 Social Work Fees and Charges schedule was presented to and
endorsed by the IJB at its meeting on 28th January 2026. All Social Work fees
and charges are included within the attached schedule of charges. 
3.4.2 The HSCP is seeking to consult on a range of measures to manage down its
budget gap which may include further increases to fees and charges for day
services, transportation and telecare/responder service.  Formal Council
approval for these will be required at a later date after consultation and
agreement to request changes by the IJB. The overall approach is to seek to
increase the contribution of eligible care service users in order to protect the
sustainability of services. 
3.5 No Inflationary Increase 
3.5.1 There are a number of fees where no inflationary increase has been applied.
These are: 
 Local Authority Residential Care Provision: Dunclutha and Shellach View –
Charges are levied to other HSCPs/Councils buying places from Argyll and
Bute.
 All licences included under Legal and Regulatory / Commercial Services and
subject to the last Triennial Review agreed in May 2024 will have no increase
in fees until May 2027.
 Homeless Temporary Accommodation – not subject to inflation, only the
service charge is inflated.
 Electric Vehicle (EV) Overstay Penalty Charges remaining at current rounded
amounts of £30 and £60. 
3.6  Fees set by Others 
3.6.1  There are also a number of services where the charges are advised by others
and therefore, at present, have not been inflated: 
 Registrars Fees - these are set by the Registrar General, and the last fees
were set in May 2022. 
 Removal of abandoned car – this charge is set by legislation.
 Petrol Storage Certificate
 Explosives/Fireworks License and Registration
 Private Water Supplies
 Roads Inspection charges, set by Roads Authority and Utility Committee
(Scotland). 
 Penalty Charges notices set by the Scottish Government. 
 Private Landlord Registration Fees set by the Scottish Government.
 Planning Statutory Fees
 Inter-Authority Substitute Family Care Placements
 Blue Badges.
 Arrestment Handling Charge
 Cinema License capped by the Cinemas Act
Page 98

Page 99

 Waste Disposal with Landfill Tax – set by Scottish Government
 Building Warrant Fees are set by Scottish Government. In discussion with
the Service the average increase for 2026-27 is estimated to be 7% which
translates to a £0.077m increase on the 2025-26 budget. Income generated
from Building Warrant Fees must be used to fund the service meaning
related expenditure budgets will also be increased by £0.077m. 
4. New Fees and Charges 
4.1  The 2026-27 budget proposals include new fees and charges for the following: 
Description Charge Reason for New Fee
Early Years Charges -
non statutory
provision per hour -
under 2 years old
£7.30 Fee in place for several years but
generated little income. Included to
ensure completeness of Fees & Charges
Schedule
Early Years Charges -
non statutory
provision per hour - 2-
3 years old
£6.70 Fee in place for several years but
generated little income. Included to
ensure completeness of Fees & Charges
Schedule
Crematorium Plaque
with full inscription for
Kerbstone - £600 
£631.00  Previously offered a charge based on
per letter
Crematorium Extra
Photo 
£15.24 New services being offered once
installation of equipment completed
Crematorium Basic
Slide Show (up to 25
photos) without Music 
£57.04 New services being offered once
installation of equipment completed
Crematorium Music
Tribute (up to 25
photos) with Music 
£88.72 New services being offered once
installation of equipment completed
Crematorium Themed
Tribute 
£120.46 New services being offered once
installation of equipment completed
Crematorium Bespoke
Tribute 
£507.16  New services being offered once
installation of equipment completed
Crematorium Tribute
Download 
£12.71 New services being offered once
installation of equipment completed
Crematorium Extra
Tribute Photos 
£26.62 New services being offered once
installation of equipment completed
Page 99

Page 100

Crematorium Extra
Work Charge 
£26.62 New services being offered once
installation of equipment completed
Crematorium Family
Supplied Tribute 
£29.28 New services being offered once
installation of equipment completed
Crematorium Late
Fees for Music and
Amendments for
Works 
£25.30 New services being offered once
installation of equipment completed
Crematorium
Streaming Live on
Demand (can be
viewed for 28 days)
Crematorium Organist
Fees 
£51.81 New services being offered once
installation of equipment completed
Organist Fees £96.00 New services being offered once
installation of equipment completed
Lismore Ferry Cycle
charge
£2.00 To cover the additional work for crew
members who carry bikes on/off ferries
and safely secure them on board.
Lismore Ferry E-Cycle
charge
£4.00 To cover the additional work for crew
members who carry bikes on/off ferries
and safely secure them on board. 
5.  REMOVED FEES AND CHARGES 
5.1 The 2026-27 budget proposals reflect fees and charges which have been
removed as they are no longer required: 
Description Charge
(25-26)
Reason for Fee Removal
Planning Services -
S64 submission
relating to
Householder
Development
£61.50 S64 becomes a flat rate statutory charge
from 01/04/2026 and will be included
under Planning Statutory Fees Guidance
Note.
S64 submission
relating to Non-
Householder Local
Development
£123.00 S64 becomes a flat rate statutory charge
from 01/04/2026 and will be included
under Planning Statutory Fees Guidance
Note.
S64 submission
relating to Major
Development
£245.00 S64 becomes a flat rate statutory charge
from 01/04/2026 and will be included
under Planning Statutory Fees Guidance
Note.
Page 100

Page 101

Discharge of planning
conditions
£110.00 Becomes a flat rate statutory charge
from 01/04/2026 and will be included
under Planning Statutory Fees Guidance
Note.
Inscription for
Kerbstone (price per
letter)
£13.00 Fee replaced with flat rate amount as
noted in Section 4.1. 
6 SAVINGS OPTION PROPOSALS  
6.1 The 2026/27 budget proposals include savings measures relating to increased
fees and charges for school meals, parking, cemeteries, and the crematorium,
as well as the introduction of new charges for out-of-hours rope-handling
activities for commercial vessels arriving at and departing from Campbeltown
Harbour. The proposed fees are included in the appended schedule of fees and
charges.  
6.2 If agreed, the increases in these charges are expected to increase income by
£0.140m, in addition to the £0.440m noted in section 3.2.3 in relation to the
general inflationary increases in charges.  
7. CONCLUSION 
7.1 The general inflationary increase would equate to additional income of £0.440m
in 2026-27.  All other fee increases agreed as part of previous budgets have
been accounted for within the base budget or as part of the previously agreed
savings amount. 
7.2  The 8% increase applied to fees and charges in respect of Piers & Harbours to
fund the Asset Management plan would equate to an additional £0.748m.
8. IMPLICATIONS 
8.1 Policy – Outlines the proposed increases to fees and charges for 2026-27.
8.2 Financial - The annual adjustment to fees and charges ensures that charges
remain relevant to service costs which enables the Council to maintain
proportionate income levels in order to sustain services. 
8.3 Legal – None.
8.4 HR – None.
8.5 Customer Service – Minimal risk in respect of the inflationary increases.
8.6 Risk – Minimal risk.
8.7 Climate Change – None.
8.8 Fairer Scotland Duty – Relates to inflationary increases therefore minimal
impact. 
8.9 Equalities (Protected Characteristics) - The proposed changes apply equally to
everyone who receives a service which the Council will continue to charge for.
Therefore, there are no anticipated adverse equality issues arising from this
report. 
8.10 Consumer Duty – Relates to inflationary increases therefore minimal impact.
Page 101

Page 102

8.11 Island Communities – Relates to inflationary increases therefore minimal impact. 
8.12 Children’s Rights and Wellbeing - None  
Kirsty Flanagan
Executive Director/Section 95 Officer
11 February 2026 
Policy Lead for Finance and Commercial Services - Councillor Ross Moreland 
Appendix 1 – Schedule of Fees and Charges 
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk
Page 102

Page 103

Appendix 1
INDEX Page
Social Work 2-3
Education 4
Legal and Regulatory Support / Commercial Services 5-9
Customer Support Services 10-11
Planning Environmental Health & Housing
Local Development Plan and Printing 12
Environmental Health 12-15
Planning Services 15-16
Building Standards 16
Housing 16
Waste Management
Waste Collection 17
Commercial Refuse 17-18
Recycling Charges 18-20
Skips 20
Householder Scrap Car Removal and Disposal Service 21
Waste Disposal 21
Amenities
Public Conveniences 22
Pest Control 22
Dog Fees 22
Room Hire -Hermitage Park Pavilion 23
Playing Fields 23
Outdoor Recreation 23
Fairs 24
Floral Decorations 24
Burial Charges 24-25
Crematorium Charges 25
Ferries, Piers and Harbours
Ferry Fares 26-27
Piers and Harbours  - Rates - Goods, Passengers and Vehicles 27-28
Piers and Harbours  - Rates - Miscellaneous 28
Piers and Harbours  - Rates - Vessels 28-30
Airfields 31-33
Network Management 34-35
School and Public Transport 35
Parking 36-37
Electric Vehicle Charging 37
Council Wide Charges 38
Filming Facilitation and Support Services 38
Fees and Charges for 2026-27
Page 1
Page 103

Page 104

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ % Notes/Comments
SOCIAL WORK
Local Authority Residential Care Provision (Community Care)
Weekly Charge (excluding Kintyre Care Centre) 1,853.38 Outwith the Scope 0.00 1,853.38 1,979.08
Outwith the
Scope 0.00 1,979.08 125.70 7%
Local Authority Residential Care Provision at Kintyre Care
Centre (Community Care) Weekly Charge 1,598.61 Outwith the Scope 0.00 1,598.61 1,708.65
Outwith the
Scope 0.00 1,708.65 110.04 7%
Local Authority Nursing Care Provision (Community Care)
Weekly Charge 1,853.38 Outwith the Scope 0.00 1,853.38 1,979.08
Outwith the
Scope 0.00 1,979.08 125.70 7%
Non - Residential Services - Lunch Clubs - per meal 5.70 Outwith the Scope 0.00 5.70 6.05
Outwith the
Scope 0.00 6.05 0.35 6%
Non - Residential Services - Telecare - Community Alarms -
per week 6.85 Outwith the Scope 0.00 6.85 7.25
Outwith the
Scope 0.00 7.25 0.40 6%
Non - Residential Services - Telecare - Care Assist System -
per week 5.85 Outwith the Scope 0.00 5.85 6.20
Outwith the
Scope 0.00 6.20 0.35 6%
Non - Residential Services - Telecare - Mobile Devices and
Monitoring - per week 3.24 Outwith the Scope 0.00 3.24 3.42
Outwith the
Scope 0.00 3.42 0.18 6%
Non - Residential Services - Telecare - Canary System - per
week 2.55 Outwith the Scope 0.00 2.55 2.70
Outwith the
Scope 0.00 2.70 0.15 6%
Non - Residential Services - Home Help - hourly rate 27.16 Outwith the Scope 0.00 27.16 28.93
Outwith the
Scope 0.00 28.93 1.77 7%
Adjusted to reflect estimated changes in
staff pay from April 2026.
Non - Residential Services - Housing Support - hourly rate 27.16 Outwith the Scope 0.00 27.16 28.93
Outwith the
Scope 0.00 28.93 1.77 7%
Adjusted to reflect estimated changes in
staff pay from April 2026.
Non - Residential Services - Employment Support - hourly
rate 27.16 Outwith the Scope 0.00 27.16 28.93
Outwith the
Scope 0.00 28.93 1.77 7%
Adjusted to reflect estimated changes in
staff pay from April 2026.
Non - Residential Services -Sleepover Service - per night 143.64 Outwith the Scope 0.00 143.64 153.36
Outwith the
Scope 0.00 153.36 9.72 7%
Adjusted to reflect estimated changes in
staff pay from April 2026.
Non - Residential Services -Transport - per day 3.60 Outwith the Scope 0.00 3.60 3.80
Outwith the
Scope 0.00 3.80 0.20 6%
Non - Residential Services -Elderly Day Care - hourly rate 11.45 Outwith the Scope 0.00 11.45 12.16
Outwith the
Scope 0.00 12.16 0.71 6%
Non - Residential Services -Learning Disability Resource
Centre Service - hourly rate 30.30 Outwith the Scope 0.00 30.30 32.12
Outwith the
Scope 0.00 32.12 1.82 6%
Adjusted to be divisible by 4 to reflect
quarter hour visits
Provision of Occupational Therapy Consultation - Per
assessment/consultation 318.30 Outwith the Scope 0.00 318.30 337.40
Outwith the
Scope 0.00 337.40 19.10 6%
Provision of Professional Services - Per Community Care
Assessment/ Consultation 797.75 Outwith the Scope 0.00 797.75 845.60
Outwith the
Scope 0.00 845.60 47.85 6%
Provision of Professional Services - Full needs assessment
only 605.75 Outwith the Scope 0.00 605.75 642.10
Outwith the
Scope 0.00 642.10 36.35 6%
Provision of Professional Services - Needs Review only 221.50 Outwith the Scope 0.00 221.50 234.80
Outwith the
Scope 0.00 234.80 13.30 6%
Children & Families - Local Authority Residential Care
Provision:   Dunclutha (weekly charge) 3,416.76 Outwith the Scope 0.00 3,416.76 3,416.76
Outwith the
Scope 0.00 3,416.76 0.00 0%
Charge levied to other HSCPs/Councils
buying places from Argyll and Bute.
Children & Families - Local Authority Residential Care
Provision: Shellach View (weekly Charge) 3,317.76 Outwith the Scope 0.00 3,317.76 3,317.76
Outwith the
Scope 0.00 3,317.76 0.00 0%
Charge levied to other HSCPs/Councils
buying places from Argyll and Bute.
Children & Families - Local Authority Residential Care
Provision: Helensburgh (weekly Charge) 3,287.90 Outwith the Scope 0.00 3,287.90 3,359.90
Outwith the
Scope 0.00 3,359.90 72.00 2%
Charge levied to other HSCPs/Councils
buying places from Argyll and Bute.
Children & Families - Other Charges - Inter Country Adoptions 8,362.60 Outwith the Scope 0.00 8,362.60 8,864.35
Outwith the
Scope 0.00 8,864.35 501.75 6%
2025-26 Increase2026-27
The HSCP is still considering and consulting
upon a range of measures to manage down
its budget gap, these include further
increases to fees and charges and formal
Council approval for these will be required
at a later date. The overall approach is to
seek to transfer some of the costs of vital
care services onto service users in order to
protect the sustainability of services.
The HSCP is still considering and consulting
upon a range of measures to manage down
its budget gap, these include further
increases to fees and charges and formal
Council approval for these will be required
at a later date. The overall approach is to
seek to transfer some of the costs of vital
care services onto service users in order to
protect the sustainability of services.
Page 2 Social Work
Page 104

Page 105

Inter-Authority Substitute Family Care Placements:
Within Scotland
In line with British
Association of
Adoption and
Fostering (BAAF)
recommended
figures Outwith the Scope
Outwith the
Scope
In line with British Association of Adoption
and Fostering (BAAF) recommended
figures.
Inter-Authority Substitute Family Care Placements:
Elsewhere - 1 child
In line with British
Association of
Adoption and
Fostering (BAAF)
recommended
figures Outwith the Scope
Outwith the
Scope
In line with British Association of Adoption
and Fostering (BAAF) recommended
figures.
Inter-Authority Substitute Family Care Placements:
Elsewhere - 2 children (siblings placed together)
In line with British
Association of
Adoption and
Fostering (BAAF)
recommended
figures Outwith the Scope
Outwith the
Scope
In line with British Association of Adoption
and Fostering (BAAF) recommended
figures.
Inter-Authority Substitute Family Care Placements:
Elsewhere - 3 children (siblings placed together)
In line with British
Association of
Adoption and
Fostering (BAAF)
recommended
figures Outwith the Scope
Outwith the
Scope
In line with British Association of Adoption
and Fostering (BAAF) recommended
figures.
Page 3 Social Work
Page 105

Page 106

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
EDUCATION CHARGES
Primary School Letting Charges per hour - Non-Profit
Organisations (room let) 15.05 Exempt 0.00 15.05 15.95 Exempt 0.00 15.95 0.90 6%
Primary School Letting Charges per hour - Commercial Rate
(room let) 41.75 Exempt 0.00 41.75 44.25 Exempt 0.00 44.25 2.50 6%
Primary School Letting Charges per hour - Non-Profit
Organisations (sports facilities) 15.58 Standard 3.12 18.70 16.50 Standard 3.30 19.80 1.10 6%
Primary School Letting Charges per hour - Commercial Rate
(sports facilities) 42.50 Standard 8.50 51.00 45.04 Standard 9.01 54.05 3.05 6%
Primary School Synthetic All Weather Pitch charge per hour -
Non-Profit Organisations 61.42 Standard 12.28 73.70 65.08 Standard 13.02 78.10 4.40 6%
Primary School Synthetic All Weather Pitch charge per hour -
Commercial Rate 104.67 Standard 20.93 125.60 110.96 Standard 22.19 133.15 7.55 6%
Sale of Meals to Pupils - Per meal (Primary-without milk) 2.30 Outwith the Scope 0.00 2.30 2.40 Outwith the Scope 0.00 2.40 0.10 4% Increase proposed as a budget saving.
Sale of Meals to Pupils - Per meal (Secondary) 2.40 Outwith the Scope 0.00 2.40 2.55 Outwith the Scope 0.00 2.55 0.15 6% Increase proposed as a budget saving.
Section 23 Charges per annum - Parklands 56,349.10 Exempt 0.00 56,349.10 59,730.05 Exempt 0.00 59,730.05 3,380.95 6%
Inveraray Primary - Room hire - half day 49.20 Exempt 0.00 49.20 52.15 Exempt 0.00 52.15 2.95 6%
Inveraray Primary - Room hire - full day 88.35 Exempt 0.00 88.35 93.65 Exempt 0.00 93.65 5.30 6%
Inveraray Primary - Catering: Tea, Coffee and Scones 3.58 Standard 0.72 4.30 3.79 Standard 0.76 4.55 0.25 6%
Inveraray Primary - Catering: Soup and Sandwiches 6.96 Standard 1.39 8.35 7.38 Standard 1.48 8.85 0.50 6%
Hostel Charges - Room hire - children's hearing - half day 28.60 Exempt 0.00 28.60 30.30 Exempt 0.00 30.30 1.70 6%
Hostel Charges - Room hire - children's hearing - full day 47.70 Exempt 0.00 47.70 50.55 Exempt 0.00 50.55 2.85 6%
Hostel Charges - Room hire - half day 47.70 Exempt 0.00 47.70 50.55 Exempt 0.00 50.55 2.85 6%
Hostel Charges - Room hire - full day 85.80 Exempt 0.00 85.80 90.95 Exempt 0.00 90.95 5.15 6%
Hostel Charges - Catering: Tea, Coffee and Biscuits 3.58 Standard 0.72 4.30 3.79 Standard 0.76 4.55 0.25 6%
Hostel Charges - Catering: Soup and Sandwiches 6.96 Standard 1.39 8.35 7.38 Standard 1.48 8.85 0.50 6%
Hostel Charges - accommodation - Argyll & Bute Council -
Bed & Breakfast 39.75 Standard 7.95 47.70 42.13 Standard 8.43 50.55 2.85 6%
Hostel Charges - accommodation - Argyll & Bute Council -
Half Board 55.75 Standard 11.15 66.90 59.08 Standard 11.82 70.90 4.00 6%
Hostel Charges - accommodation - Other Groups - Bed &
Breakfast 39.75 Standard 7.95 47.70 42.13 Standard 8.43 50.55 2.85 6%
Hostel Charges - accommodation - Other Groups - Half Board
55.75 Standard 11.15 66.90 59.08 Standard 11.82 70.90 4.00 6%
Hostel Charges - accommodation - Other Groups - Full Board
63.63 Standard 12.73 76.35 67.46 Standard 13.49 80.95 4.60 6%
Early Years Charges - non statutory provision per hour - under
2 years old 7.30 Exempt 0.00 7.30 7.30
Early Years Charges - non statutory provision per hour - 2-3
years old 6.70 Exempt 0.00 6.70 6.70
Increase2026-272025-26
Page 4 Education
Page 106

Page 107

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
LEGAL AND REGULATORY / COMMERCIAL SERVICES
Solicitors Property Enquiry Certificates 203.50 Standard 40.70 244.20 215.71 Standard 43.14 258.85 14.65 6%
Taxi Car Licence 533.00 Outwith the Scope 0.00 533.00 533.00 Outwith the Scope 0.00 533.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Private Hire Car Licence 533.00 Outwith the Scope 0.00 533.00 533.00 Outwith the Scope 0.00 533.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Taxi/Private Hire Car Driver Licence 133.00 Outwith the Scope 0.00 133.00 133.00 Outwith the Scope 0.00 133.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Second Hand Dealer Licence 533.00 Outwith the Scope 0.00 533.00 533.00 Outwith the Scope 0.00 533.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Second Hand Motor Dealer Licence 617.00 Outwith the Scope 0.00 617.00 617.00 Outwith the Scope 0.00 617.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Metal Dealer Licence 617.00 Outwith the Scope 0.00 617.00 617.00 Outwith the Scope 0.00 617.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Temporary exemption warrant - Metal Dealers 176.00 Outwith the Scope 0.00 176.00 176.00 Outwith the Scope 0.00 176.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Boat Hire Licence 324.00 Outwith the Scope 0.00 324.00 324.00 Outwith the Scope 0.00 324.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Street Trader Licence 324.00 Outwith the Scope 0.00 324.00 324.00 Outwith the Scope 0.00 324.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Street Trader - Charity/Temporary 107.00 Outwith the Scope 0.00 107.00 107.00 Outwith the Scope 0.00 107.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Market Operator Licence 617.00 Outwith the Scope 0.00 617.00 617.00 Outwith the Scope 0.00 617.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Market Operator - voluntary/charitable organisation holding
one event per year 205.00 Outwith the Scope 0.00 205.00 205.00 Outwith the Scope 0.00 205.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Public Entertainment Licence 617.00 Outwith the Scope 0.00 617.00 617.00 Outwith the Scope 0.00 617.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Public Entertainment temporary Licence 176.00 Outwith the Scope 0.00 176.00 176.00 Outwith the Scope 0.00 176.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Late hours catering licence 617.00 Outwith the Scope 0.00 617.00 617.00 Outwith the Scope 0.00 617.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Window Cleaner Licence 324.00 Outwith the Scope 0.00 324.00 324.00 Outwith the Scope 0.00 324.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Substitution of vehicle (taxi/private hire) - same day 107.00 Outwith the Scope 0.00 107.00 107.00 Outwith the Scope 0.00 107.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Substitution of vehicle (taxi/private hire) - within 5 days 78.00 Outwith the Scope 0.00 78.00 78.00 Outwith the Scope 0.00 78.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Certified copy of a licence 48.00 Outwith the Scope 0.00 48.00 48.00 Outwith the Scope 0.00 48.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Re-issue of a badge 48.00 Outwith the Scope 0.00 48.00 48.00 Outwith the Scope 0.00 48.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Re-issue of taxi/private hire car plate 48.00 Outwith the Scope 0.00 48.00 48.00 Outwith the Scope 0.00 48.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
2025-26 Increase2026-27
Page 5 L&R Comm
Page 107

Page 108

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2025-26 Increase2026-27
Extract of Civic Government Register 43.00 Outwith the Scope 0.00 43.00 43.00 Outwith the Scope 0.00 43.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Copy of Civic Government Register 107.00 Outwith the Scope 0.00 107.00 107.00 Outwith the Scope 0.00 107.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Taxi Booking Office Licence 147.00 Outwith the Scope 0.00 147.00 147.00 Outwith the Scope 0.00 147.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Amendment to Civic Govt Licence 91.00 Outwith the Scope 0.00 91.00 91.00 Outwith the Scope 0.00 91.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Knife Dealers Licence 617.00 Outwith the Scope 0.00 617.00 617.00 Outwith the Scope 0.00 617.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Skin piercing & tattoo operator Licence (premises occupied
by them) 368.00 Outwith the Scope 0.00 368.00 368.00 Outwith the Scope 0.00 368.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Skin piercing & tattoo operator Licence (premises under
control of others) 295.00 Outwith the Scope 0.00 295.00 295.00 Outwith the Scope 0.00 295.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Vehicle Inspection Fee (per inspection note 50% surcharge
will be applied for re-inspection/appointment no show ) 95.00 Outwith the Scope 0.00 95.00 95.00 Outwith the Scope 0.00 95.00 0.00 0%
As a result of the Triennial Review these
fees and charges are effective from 1st May
2024
Letting of Kitchen Accommodation - Monday to Friday (charge
per hour) 27.46 Standard 5.49 32.95 29.13 Standard 5.83 34.95 2.00 6%
Letting of Kitchen Accommodation - Saturday & Sunday
(charge per hour) 31.08 Standard 6.22 37.30 32.96 Standard 6.59 39.55 2.25 6%
Letting of Kitchen Accommodation - Public Holiday (charge
per hour) 36.67 Standard 7.33 44.00 38.88 Standard 7.78 46.65 2.65 6%
Letting of Kitchen Accommodation - Failure to Reinstate 77.58 Standard 15.52 93.10 82.25 Standard 16.45 98.70 5.60 6%
Helensburgh & Lomond Civic Centre - Hire of Community
Room - up to 20 persons (Concession rate per hour Monday -
Friday 09:00 to 20:00) 21.33 Standard 4.27 25.60 22.63 Standard 4.53 27.15 1.55 6%
Helensburgh & Lomond Civic Centre - Hire of Community
Room - up to 20 persons (Concession rate per hour Saturday
-Sunday & Monday - Friday after 20:00) 27.33 Standard 5.47 32.80 28.96 Standard 5.79 34.75 1.95 6%
Helensburgh & Lomond Civic Centre - Hire of Community
Room - up to 20 persons (Commercial rate per hour Monday -
Friday 09:00 to 20:00) 26.21 Standard 5.24 31.45 27.79 Standard 5.56 33.35 1.90 6%
Helensburgh & Lomond Civic Centre - Hire of Community
Room - up to 20 persons (Commercial rate per hour Saturday
-Sunday & Monday - Friday after 20:00) 33.46 Standard 6.69 40.15 35.46 Standard 7.09 42.55 2.40 6%
Helensburgh & Lomond Civic Centre - Hire of Assembly Hall -
up to 100 persons (Concession rate per hour Monday - Friday
09:00 to 20:00) 29.79 Standard 5.96 35.75 31.58 Standard 6.32 37.90 2.15 6%
Helensburgh & Lomond Civic Centre - Hire of Assembly Hall -
up to 100 persons (Concession rate per hour Saturday -
Sunday & Monday - Friday after 20:00) 35.79 Standard 7.16 42.95 37.96 Standard 7.59 45.55 2.60 6%
Helensburgh & Lomond Civic Centre - Hire of Assembly Hall -
up to 100 persons (Commercial rate per hour Monday -
Friday 09:00 to 20:00) 36.54 Standard 7.31 43.85 38.75 Standard 7.75 46.50 2.65 6%
Helensburgh & Lomond Civic Centre - Hire of Assembly - up
to 100 persons (Commercial rate per hour Saturday -Sunday
& Monday - Friday after 20:00) 43.88 Standard 8.78 52.65 46.50 Standard 9.30 55.80 3.15 6%
Helensburgh & Lomond Civic Centre - Hire of Annex Room 1 -
up to 30 persons (Concession rate per hour Monday - Friday
09:00 to 20:00) 19.38 Standard 3.88 23.25 20.54 Standard 4.11 24.65 1.40 6%
Helensburgh & Lomond Civic Centre - Hire of Annex Room 1 -
up to 30 persons (Concession rate per hour Saturday -
Sunday & Monday - Friday after 20:00) 25.29 Standard 5.06 30.35 26.79 Standard 5.36 32.15 1.80 6%
Helensburgh & Lomond Civic Centre - Hire of Annex Room 1 -
up to 30 persons (Commercial rate per hour Monday - Friday
09:00 to 20:00) 23.75 Standard 4.75 28.50 25.17 Standard 5.03 30.20 1.70 6%
Helensburgh & Lomond Civic Centre - Hire of Annex Room 1 -
up to 30 persons (Commercial rate per hour Saturday -
Sunday & Monday - Friday after 20:00) 31.04 Standard 6.21 37.25 32.92 Standard 6.58 39.50 2.25 6%
Page 6 L&R Comm
Page 108

Page 109

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2025-26 Increase2026-27
Helensburgh & Lomond Civic Centre - Hire of Annex Room 2 -
up to 20 persons (Concession rate per hour Monday - Friday
09:00 to 20:00) 15.42 Standard 3.08 18.50 16.33 Standard 3.27 19.60 1.10 6%
Annex Room 2 will be offered half price if
booked in combination with Annex Room 1
For concessions either £9.80 or £13.58 or
Commercial either £12.00 or £16.68
Helensburgh & Lomond Civic Centre - Hire of Annex Room 2 -
up to 20 persons (Concession rate per hour Saturday -
Sunday & Monday - Friday after 20:00) 21.33 Standard 4.27 25.60 22.63 Standard 4.53 27.15 1.55 6%
Annex Room 2 will be offered half price if
booked in combination with Annex Room 1
For concessions either £9.80 or £13.58 or
Commercial either £12.00 or £16.68
Helensburgh & Lomond Civic Centre - Hire of Annex Room 2 -
up to 20 persons (Commercial rate per hour Monday - Friday
09:00 to 20:00) 18.88 Standard 3.78 22.65 20.00 Standard 4.00 24.00 1.35 6%
Annex Room 2 will be offered half price if
booked in combination with Annex Room 1
For concessions either £9.80 or £13.58 or
Commercial either £12.00 or £16.68
Helensburgh & Lomond Civic Centre - Hire of Annex Room 2 -
up to 20 persons (Commercial rate per hour Saturday -
Sunday & Monday - Friday after 20:00) 26.21 Standard 5.24 31.45 27.79 Standard 5.56 33.35 1.90 6%
Annex Room 2 will be offered half price if
booked in combination with Annex Room 1
For concessions either £9.80 or £13.58 or
Commercial either £12.00 or £16.68
Helensburgh & Lomond Civic Centre - Hire of Annex Room 1
and 2 (Concession rate per hour Monday - Friday 09:00 to
20:00) 27.08 Standard 5.42 32.50 28.71 Standard 5.74 34.45 1.95 6%
Helensburgh & Lomond Civic Centre - Hire of Annex Room 1
and 2 (Concession rate per hour Saturday -Sunday & Monday
- Friday after 20:00) 36.00 Standard 7.20 43.20 38.17 Standard 7.63 45.80 2.60 6%
Helensburgh & Lomond Civic Centre - Hire of Annex Room 1
and 2 (Commercial rate per hour Monday - Friday 09:00 to
20:00) 35.13 Standard 7.03 42.15 37.25 Standard 7.45 44.70 2.55 6%
Helensburgh & Lomond Civic Centre - Hire of Annex Room 1
and 2 (Commercial rate per hour Saturday -Sunday &
Monday - Friday after 20:00) 46.83 Standard 9.37 56.20 49.63 Standard 9.93 59.55 3.35 6%
Helensburgh & Lomond Civic Centre - Hire of Marriage
Suite/Function Room(Concession rate per hour Monday -
Friday 09:00 to 20:00) 26.79 Standard 5.36 32.15 28.42 Standard 5.68 34.10 1.95 6%
Helensburgh & Lomond Civic Centre - Hire of Marriage
Suite/Function Room (Concession rate per hour Saturday -
Sunday & Monday - Friday after 20:00) 32.79 Standard 6.56 39.35 34.75 Standard 6.95 41.70 2.35 6%
Helensburgh & Lomond Civic Centre - Hire of Marriage
Suite/Function Room (Commercial rate per hour Monday -
Friday 09:00 to 20:00) 34.88 Standard 6.98 41.85 36.96 Standard 7.39 44.35 2.50 6%
Helensburgh & Lomond Civic Centre - Hire of Marriage
Suite/Function Room (Commercial rate per hour Saturday -
Sunday & Monday - Friday after 20:00) 42.67 Standard 8.53 51.20 45.21 Standard 9.04 54.25 3.05 6%
Page 7 L&R Comm
Page 109

Page 110

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2025-26 Increase2026-27
TRADING STANDARDS
Explosives/Fireworks - Issue of Store Licence (i.e. when
separation distances apply)
STATUTORY
CHARGE 202.00 Outwith the Scope 0.00 202.00 202.00 Outwith the Scope 0.00 202.00 0.00 0%
All explosives and fireworks fees are set by
the UK Government and can be found in
Schedule 7 of the current Health and Safety
and Nuclear (Fees) Regulations
These Regulations are subject to change at
short notice.
Explosives/Fireworks - Renewal of store licence (i.e. when
separation distances apply
STATUTORY
CHARGE 94.00 Outwith the Scope 0.00 94.00 94.00 Outwith the Scope 0.00 94.00 0.00 0%
All explosives and fireworks fees are set by
the UK Government and can be found in
Schedule 7 of the current Health and Safety
and Nuclear (Fees) Regulations
These Regulations are subject to change at
short notice.
Explosives/Fireworks - Issue of registration for keeping
explosives (i.e. when no separation distances apply)
STATUTORY
CHARGE 119.00 Outwith the Scope 0.00 119.00 119.00 Outwith the Scope 0.00 119.00 0.00 0%
All explosives and fireworks fees are set by
the UK Government and can be found in
Schedule 7 of the current Health and Safety
and Nuclear (Fees) Regulations
These Regulations are subject to change at
short notice.
Explosives/Fireworks - Renewal of registration for keeping
Explosives (i.e. when no separation distances apply)
STATUTORY
CHARGE 59.00 Outwith the Scope 0.00 59.00 59.00 Outwith the Scope 0.00 59.00 0.00 0%
All explosives and fireworks fees are set by
the UK Government and can be found in
Schedule 7 of the current Health and Safety
and Nuclear (Fees) Regulations
These Regulations are subject to change at
short notice.
Fee to transfer, vary or replace a licence or registration 
STATUTORY
CHARGE 40.00 Outwith the Scope 0.00 40.00 40.00 Outwith the Scope 0.00 40.00 0.00 0%
All explosives and fireworks fees are set by
the UK Government and can be found in
Schedule 7 of the current Health and Safety
and Nuclear (Fees) Regulations
These Regulations are subject to change at
short notice.
PETROLEUM
Notes to Fireworks & Explosives charges
1. If you keep fireworks, shotgun cartridges, certain bird scarers or other explosive products for sale you are likely to require an explosive licence.
2. You can generally store up to 2,000 kg of explosives with a licence issued by us, although there are some conditions relating to its storage.
3. We will need to know the hazard type and quantity of the explosives you wish to store to determine whether your store is suitable.
4. The quantity you will be allowed to store will depend on the hazard type of the explosives.
5. Regulation 27 of the Explosives Regulation 2014 sets out the distances that must be maintained between a store and a building or other place. This is known as the separation distance. You will not normally be required to maintain separation
distances if you store no more than: a) 250kg hazard type 4 b) 25kg hazard type 3 (or combination of hazard type 3 and hazard type 4)
6. The most common fees for storage of fireworks for one year are set out below. Discounted rates are available for periods of 2-5 years.
7. Prices for other types of explosive licences are available upon request.
8. All fees for storage of explosives are set by the UK Government, and can currently be found in Schedule 7 of the Health and Safety and Nuclear (Fees) Regulations as amended by the Health and Safety and Nuclear (Fees) (Amendment)
Regulations 2023. These regulations are subject to change at short notice.
Notes to Petroleum charges
1. A fee is payable to store petrol under regulation 6 (petrol filling stations) or regulation 14 (non work-place storage) of the Petroleum (Consolidation) Regulations 2014. All fees for storage of petroleum are set by the UK Government, and can currently be found in
Schedule 7 of the Health and Safety and Nuclear (Fee)s Regulations 2022 as amended by the Health and Safety and Nuclear (Fees) (Amendment) Regulations 2023.. These regulations are subject to change at short notice.
2. The current fees for a certificate or licence for one year are shown below. Prices for multiple-year certificates or licences are available on request.
3. Historical Records - We hold historical records of tanks previously licensed for the storage of petroleum spirit. Information regarding specific premises and whether tanks were present and the methods used for making them safe from the danger of fire or explosion
can be disclosed on written request. The disclosure is subject to payment of a reasonable fee.
Page 8 L&R Comm
Page 110

Page 111

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2025-26 Increase2026-27
Petrol Storage Certificate or Licence to keep petroleum spirit
of a quantity <2500 litres
STATUTORY
CHARGE 48.00 Outwith the Scope 0.00 48.00 48.00 Outwith the Scope 0.00 48.00 0.00 0%
All petroleum storage fees are set by the
UK Government and can be found in
Schedule 7 of the current Health and Safety
and Nuclear (Fees) Regulations
These Regulations are subject to change at
short notice.
Petrol Storage Certificate or Licence to keep petroleum spirit
of a quantity  between 2500 and 50000 litres
STATUTORY
CHARGE 65.00 Outwith the Scope 0.00 65.00 65.00 Outwith the Scope 0.00 65.00 0.00 0%
All petroleum storage fees are set by the
UK Government and can be found in
Schedule 7 of the current Health and Safety
and Nuclear (Fees) Regulations
These Regulations are subject to change at
short notice.
Petrol Storage Certificate or Licence to keep petroleum spirit
of a quantity > 50000 litres
STATUTORY
CHARGE 137.00 Outwith the Scope 0.00 137.00 137.00 Outwith the Scope 0.00 137.00 0.00 0%
All petroleum storage fees are set by the
UK Government and can be found in
Schedule 7 of the current Health and Safety
and Nuclear (Fees) Regulations
These Regulations are subject to change at
short notice.
Historical Records - Charge for Officer time (per hour) - out of
hours or weekend work incurs a 50% surcharge on the hourly
rate
Officer cost per
hour 97.00 Standard 19.40 116.40 102.83 Standard 20.57 123.40 7.00 6%
Disclosure of historical records is subject to
a reasonable hourly fee
Metrology
Weights and Measures:- all certification & verification work –
Weights & Measures Inspector.
Officer cost per
hour 97.00 Standard 19.40 116.40 102.83 Standard 20.57 123.40 7.00 6%
Weights and Measures:- all certification & verification work –
Assisting Officer.
Officer cost per
hour 64.71 Standard 12.94 77.65 68.58 Standard 13.72 82.30 4.65 6%
Certificate of Errors: Request for certificate
Calibration
Certificate cost 58.63 Standard 11.73 70.35 62.13 Standard 12.43 74.55 4.20 6%
Note: When supplying specialist equipment (including
but not limited to weighbridge test unit, van and test
weights, etc) an additional fee may be charged hourly,
daily or per appointment, according to circumstance
Prices on
application
Notes to Metrology (Weights & Measures) Calibration Charges
1. The 2023/24 guidance is based on a chargeable rate of £103.60 per officer per hour, designed to facilitate full cost recovery for metrological activity.  A charge is made per officer hour spent at the place of submission of the equipment for the purposes of
examination, adjustment, testing or retesting of the equipment.  It should be noted that the time taken should be quoted on the account and should not include any time spent on research or on travel to the site at which the equipment is to be tested.                                                                                                                      
2. An additional charge of £69.10 per hour will be applied when another officer is required to provide assistance to the inspector.
3.  For any work not covered by this guidance, or which varies significantly or is carried out in exceptional circumstances, an appropriate charge may be calculated as a surcharge to the hourly rate.
4. When a visit is made by a Trading Standards Officer to any premises for the purpose of carrying out any calibration functions, each visit may be subject to a minimum charge of £103.60 per Officer per visit regardless of the nature or amount of work requested or
completed.
5.  Visits carried out partly or entirely outside of normal office hours may incur a surcharge of 50% of the standard hourly rate per Officer per hour.
6. The guidance relates to the cost of testing single items. Inspectors should not be inhibited from departing from the quoted fee in locally determined circumstances. Discounted fees may be appropriate, for example, in the following circumstances:
a. Where more than a single item is submitted on one occasion and particularly where large quantities are involved;
b. Where facilities, equipment or assistance are provided by the submitter by prior arrangement;
7. When supplying specialist equipment (including but not limited to weighbridge test unit, van and test weights, etc) an additional fee may be charged hourly, daily or per appointment, according to circumstance.
VAT rate applies unless work undertaken
under the Measuring Instruments (EEC
Requirements) Regs 1988.
Page 9 L&R Comm
Page 111

Page 112

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
CUSTOMER SUPPORT SERVICES
Commission on trade union deductions 2.50% Standard 2.50% 2.50% Standard 2.50%
Percentage charge - same as previous year
Arrestment handling charge per item 0.83 Standard 0.17 1.00 0.83 Standard 0.17 1.00 0.00 0%
This is a Statutory Charge.  The maximum
that can be charged is £1
Info to Banks etc - Handling Charge 28.42 Standard 5.68 34.10 30.13 Standard 6.03 36.15 2.05 6%
Registrars Fees and Charges (Extracts at time of registration) 10.00 Outwith the Scope 0.00 10.00 10.00 Outwith the Scope 0.00 10.00 0.00 0%
Set by Registrar General - no announced
increase for 2026-27
Registrars Fees and Charges (Extracts outwith a calendar
month of registration) 15.00 Outwith the Scope 0.00 15.00 15.00 Outwith the Scope 0.00 15.00 0.00 0%
Set by Registrar General - no announced
increase for 2026-27
Registrars Search & Genealogy - Particular Search 5.00 Outwith the Scope 0.00 5.00 5.00 Outwith the Scope 0.00 5.00 0.00 0%
Set by Registrar General - no announced
increase for 2026-27
Registrars Search & Genealogy - General Search 15.00 Outwith the Scope 0.00 15.00 15.00 Outwith the Scope 0.00 15.00 0.00 0%
Set by Registrar General - no announced
increase for 2026-27
Registrars - Recording of name, or change of name or
surname or alternative name 40.00 Outwith the Scope 0.00 40.00 40.00 Outwith the Scope 0.00 40.00 0.00 0%
Set by Registrar General - no announced
increase for 2026-27
Registrars - Printing a copy certificate (for delivering see rows
13 and 14) 15.00 Outwith the Scope 0.00 15.00 15.00 Outwith the Scope 0.00 15.00 0.00 0%
Set by Registrar General - no announced
increase for 2026-27
Registrars - Delivering a copy certificate within the UK 3.20 Outwith the Scope 0.00 3.20 3.40 Outwith the Scope 0.00 3.40 0.20 6%
Postage element for row 12
Registrars - Delivering copy certificate outwith the UK 6.35 Outwith the Scope 0.00 6.35 6.75 Outwith the Scope 0.00 6.75 0.40 6%
Postage element for row 12
Marriage Notices (Per Person) 45.00 Outwith the Scope 0.00 45.00 45.00 Outwith the Scope 0.00 45.00 0.00 0%
Set by Registrar General - no announced
increase for 2026-27
Civil Marriage/Partnership Solemnisation 55.00 Outwith the Scope 0.00 55.00 55.00 Outwith the Scope 0.00 55.00 0.00 0%
Set by Registrar General - no announced
increase for 2026-27
Registrars Rental Income - Registrars Office Wedding 126.85 Outwith the Scope 0.00 126.85 134.45 Outwith the Scope 0.00 134.45 7.60 6%
Registrars Rental Income - Registrars Office Wedding -
Saturday 255.35 Outwith the Scope 0.00 255.35 270.65 Outwith the Scope 0.00 270.65 15.30 6%
Admin charges (for registrar attendance at non-statutory
venue) - weekday 334.40 Outwith the Scope 0.00 334.40 354.45 Outwith the Scope 0.00 354.45 20.05 6%
Admin charges (for registrar attendance at non-statutory
venue) - Saturday 396.85 Outwith the Scope 0.00 396.85 420.65 Outwith the Scope 0.00 420.65 23.80 6%
Admin charges, evenings after 6pm 451.30 Outwith the Scope 0.00 451.30 478.40 Outwith the Scope 0.00 478.40 27.10 6%
Admin charges, Sundays & Public Holidays (excl. Easter &
Christmas) 504.05 Outwith the Scope 0.00 504.05 534.30 Outwith the Scope 0.00 534.30 30.25 6%
Blue Badges 20.00 Outwith the Scope 0.00 20.00 20.00 Outwith the Scope 0.00 20.00 0.00 0%
Set by Scottish Government
Registrars Travel Fees - rate per mile 0.60 Zero Rated 0.00 0.60 0.60 Zero Rated 0.00 0.60 0.00 0%
Customer Service Point Room Hire - Non Profit Organisations
(room let) 15.05 Exempt 0.00 15.05 15.95 Exempt 0.00 15.95 0.90 6%
Customer Service Point Room Hire - Non Profit Organisations
(room let) - Half day 49.20 Exempt 0.00 49.20 52.15 Exempt 0.00 52.15 2.95 6%
Customer Service Point Room Hire - Non Profit Organisations
(room let) - Full day 88.35 Exempt 0.00 88.35 93.65 Exempt 0.00 93.65 5.30 6%
Customer Service Point Room Hire - Commercial Rate (room
let) 41.75 Exempt 0.00 41.75 44.25 Exempt 0.00 44.25 2.50 6%
Naming Ceremonies at Registration Office - Monday - Friday 95.00 Standard 19.00 114.00 100.83 Standard 20.17 121.00 7.00 6%
Naming Ceremonies at Registration Office - Saturday 127.50 Standard 25.50 153.00 135.00 Standard 27.00 162.00 9.00 6%
Naming Ceremonies at a Venue or Location - Monday - Friday 136.67 Standard 27.33 164.00 145.00 Standard 29.00 174.00 10.00 6%
Naming Ceremonies at a Venue or Location - Saturday 168.33 Standard 33.67 202.00 178.33 Standard 35.67 214.00 12.00 6%
2025-26 2026-27 Increase
Page 10 Customer Support Services
Page 112

Page 113

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
CUSTOMER SUPPORT SERVICES
2025-26 2026-27 Increase
Naming Ceremonies - Additional charge if a second
registration escort is required for a large ceremony 53.00 Standard 10.60 63.60 56.18 Standard 11.24 67.42 3.82 6%
Naming Ceremonies - Additional charge for each child of the
same family 10.60 Standard 2.12 12.72 11.24 Standard 2.25 13.48 0.76 6%
Naming Ceremonies - Additional charge if held as part of a
civil marriage/partnership 53.00 Standard 10.60 63.60 56.18 Standard 11.24 67.42 3.82 6%
Renewal of Vows Ceremony at Registration Office - Monday -
Friday 159.17 Standard 31.83 191.00 168.33 Standard 33.67 202.00 11.00 6%
Renewal of Vows Ceremony at Registration Office - Saturday 210.83 Standard 42.17 253.00 223.33 Standard 44.67 268.00 15.00 6%
Renewal of Vows Ceremony at a Venue or Location - Monday
- Friday 232.50 Standard 46.50 279.00 246.67 Standard 49.33 296.00 17.00 6%
Renewal of Vows Ceremony at a Venue or Location -
Saturday 232.50 Standard 46.50 279.00 246.67 Standard 49.33 296.00 17.00 6%
Renewal of Vows - Additional charge if a second registration
escort is required for a large ceremony 53.00 Standard 10.60 63.60 56.18 Standard 11.24 67.42 3.82 6%
Extract/Search of Lair Register on Islands 39.00 Outwith the Scope 0.00 39.00 41.00 Outwith the Scope 0.00 41.00 2.00 5%
Funeral Ceremony  - Monday - Friday 150.00 Exempt 0.00 150.00 150.00 Exempt 0.00 180.00 30.00 20%
Funeral Ceremony -  Saturday 250.00 Exempt 0.00 250.00 250.00 Exempt 0.00 300.00 50.00 20%
Page 11 Customer Support Services
Page 113

Page 114

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
LOCAL DEVELOPMENT PLAN & PRINTING
Local Development Plan (Incl of P&P) - Proposals Maps Book 71.20 Outwith the Scope 0.00 71.20 75.45 Outwith the Scope 0.00 75.45 4.25 6% Replacing all Local Plans. Community
Councils 50% reduction
Local Development Plan (Incl of P&P) - Written Statement 35.50 Outwith the Scope 0.00 35.50 37.65 Outwith the Scope 0.00 37.65 2.15 6% Replacing all Local Plans. Community
Councils 50% reduction
Landscape Capacity Study (Incl P&P) - Bute & Cowal 32.80 Outwith the Scope 0.00 32.80 34.75 Outwith the Scope 0.00 34.75 1.95 6%
Landscape Capacity Study (Incl P&P) - Mull 15.65 Outwith the Scope 0.00 15.65 16.60 Outwith the Scope 0.00 16.60 0.95 6%
Landscape Capacity Study (Incl P&P) - North & South Kintyre 18.80 Outwith the Scope 0.00 18.80 19.95 Outwith the Scope 0.00 19.95 1.15 6%
Landscape Capacity Study (Incl P&P) - Lorn 37.35 Outwith the Scope 0.00 37.35 39.60 Outwith the Scope 0.00 39.60 2.25 6%
Landscape Capacity Study (Incl P&P) - Mid Argyll & Inveraray 23.75 Outwith the Scope 0.00 23.75 25.20 Outwith the Scope 0.00 25.20 1.45 6%
Landscape Capacity Study (Incl P&P) - Islay 12.35 Outwith the Scope 0.00 12.35 13.10 Outwith the Scope 0.00 13.10 0.75 6%
Location Plans (10 Copies) 37.85 Outwith the Scope 0.00 37.85 40.10 Outwith the Scope 0.00 40.10 2.25 6%
Printing - Internal Service Only - A2 Prints each 12.05 Outwith the Scope 0.00 12.05 12.75 Outwith the Scope 0.00 12.75 0.70 6%
Printing - Internal Service Only - A2 Prints (+11) each 8.60 Outwith the Scope 0.00 8.60 9.10 Outwith the Scope 0.00 9.10 0.50 6%
Printing - Internal Service Only - A1 Prints (1-10 copies) each 17.05 Outwith the Scope 0.00 17.05 18.05 Outwith the Scope 0.00 18.05 1.00 6%
Printing - Internal Service Only - A1 Prints (+11 copies) each 13.65 Outwith the Scope 0.00 13.65 14.45 Outwith the Scope 0.00 14.45 0.80 6%
Printing - Internal Service Only - A0 Prints (1-10 copies) each
25.65
Outwith the Scope 0.00 25.65 27.20 Outwith the Scope 0.00 27.20 1.55 6%
Printing - Internal Service Only - A0 Prints (+11 copies) each
22.35
Outwith the Scope 0.00 22.35 23.70 Outwith the Scope 0.00 23.70 1.35 6%
Statutory Street Naming and/or numbering of one property
117.00
Outwith the Scope 0.00 117.00 124.00 Outwith the Scope 0.00 124.00 7.00 6%
Statutory Street Naming and/or numbering for the 2nd and
each additional property 58.55
Outwith the Scope 0.00 58.55 62.05 Outwith the Scope 0.00 62.05 3.50 6%
Statutory Street Naming a new street
255.95
Outwith the Scope 0.00 255.95 271.30 Outwith the Scope 0.00 271.30 15.35 6%
Changing a property name or adding to the Royal Mail
database 113.00
Outwith the Scope 0.00 113.00 119.80 Outwith the Scope 0.00 119.80 6.80 6%
Confirming an address to a solicitor, property owner or any
organisation - per letter 75.40
Outwith the Scope 0.00 75.40 79.90 Outwith the Scope 0.00 79.90 4.50 6%
Phase 1 Habitat Surveys
497.60
Outwith the Scope 0.00 497.60 527.45 Outwith the Scope 0.00 527.45 29.85 6% Travel to be charged at Council Rate 45p/mile
Possible overnight stay to be charged at a
maximum of £50.
ENVIRONMENTAL HEALTH
Food Examination - Export of Food/Fish Certificates Per Certificate
122.00
Outwith the Scope 0.00 122.00 129.30 Outwith the Scope 0.00 129.30 7.30 6%
Food Examination - Export of Food/Fish Certificates - less
than 60kg in weight
Per Certificate
53.05
Outwith the Scope 0.00 53.05 56.25 Outwith the Scope 0.00 56.25 3.20 6%
Food Examination - Condemnation Certificate (Voluntary
Surrender)
274.67
Standard 54.93 329.60 291.17 Standard 58.23 349.40 19.80 6%
Licences/Registration - Riding Establishment Act 1964/70 Vets Fees to be
added 549.60
Outwith the Scope 0.00 549.60 582.60 Outwith the Scope 0.00 582.60 33.00 6%
Licences/Registration - Dangerous Wild Animals Act 1976 Vets Fees to be
added 433.00
Outwith the Scope 0.00 433.00 459.00 Outwith the Scope 0.00 459.00 26.00 6%
Animal Welfare (Licensing of Activities Involving Animals)
(Scotland) Regulations 2021,
Animal Welfare Establishment - New licence
Vets Fees to be
added
272.05
Outwith the Scope 0.00 272.05 288.35 Outwith the Scope 0.00 288.35 16.30 6% Charitable discount – 50% (applies to
registered Scottish Charities and SCIOs)
Animal Welfare (Licensing of Activities Involving Animals)
(Scotland) Regulations 2021,
Animal Welfare Establishment - Variation of licence
Vets Fees to be
added
217.55
Outwith the Scope 0.00 217.55 230.60 Outwith the Scope 0.00 230.60 13.05 6% Charitable discount – 50% (applies to
registered Scottish Charities and SCIOs)
Animal Welfare (Licensing of Activities Involving Animals)
(Scotland) Regulations 2021,
Animal Welfare Establishment - Licensing enforcement visit
No. 1
Vets Fees to be
added
226.70
Outwith the Scope 0.00 226.70 240.30 Outwith the Scope 0.00 240.30 13.60 6% Subsequent enforcement visits: charged at
hourly rate of £32.27 in half-hourly increments
Animal Welfare (Licensing of Activities Involving Animals)
(Scotland) Regulations 2021,
Dog, Cat or Rabbit Breeding - New licence
Vets Fees to be
added
217.55
Outwith the Scope 0.00 217.55 230.60 Outwith the Scope 0.00 230.60 13.05 6% Charitable discount – 50% (applies to
registered Scottish Charities and SCIOs)
2025-26 Increase2026-27
Renaming or renumbering a street - pricing as
for new properties
Page 12 Planning, Environ Hlth & Hous
Page 114

Page 115

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2025-26 Increase2026-27
Animal Welfare (Licensing of Activities Involving Animals)
(Scotland) Regulations 2021,
Dog, Cat or Rabbit Breeding - Variation of licence
Vets Fees to be
added
163.20
Outwith the Scope 0.00 163.20 173.00 Outwith the Scope 0.00 173.00 9.80 6% Charitable discount – 50% (applies to
registered Scottish Charities and SCIOs)
Animal Welfare (Licensing of Activities Involving Animals)
(Scotland) Regulations 2021,
Dog, Cat or Rabbit Breeding - Licensing enforcement visit No.
1
Vets Fees to be
added
190.40
Outwith the Scope 0.00 190.40 201.80 Outwith the Scope 0.00 201.80 11.40 6% Subsequent enforcement visits: charged at
hourly rate of £32.27 in half-hourly increments
Animal Welfare (Licensing of Activities Involving Animals)
(Scotland) Regulations 2021, New Licence
• Operating a business of selling animals as pets
• animal rehoming activities (other than operating as an animal
welfare establishment)
New licence
Vets Fees to be
added
235.75
Outwith the Scope 0.00 235.75 249.90 Outwith the Scope 0.00 249.90 14.15 6% Charitable discount – 50% (applies to
registered Scottish Charities and SCIOs)
Animal Welfare (Licensing of Activities Involving Animals)
(Scotland) Regulations 2021, Variation of Licence
• Operating a business of selling animals as pets
• animal rehoming activities (other than operating as an animal
welfare establishment)
Variation of licence
Vets Fees to be
added
181.35
Outwith the Scope 0.00 181.35 192.25 Outwith the Scope 0.00 192.25 10.90 6% Charitable discount – 50% (applies to
registered Scottish Charities and SCIOs)
Animal Welfare (Licensing of Activities Involving Animals)
(Scotland) Regulations 2021, Licensing enforcement
interventions No. 1
• Operating a business of selling animals as pets
• animal rehoming activities (other than operating as an animal
welfare establishment)
Vets Fees to be
added
208.55
Outwith the Scope 0.00 208.55 221.05 Outwith the Scope 0.00 221.05 12.50 6% Subsequent enforcement visits: charged at
hourly rate of £32.27 in half-hourly increments
Licences/Registration - Animal Boarding Establishments Act
1963
Vets Fees to be
added 234.60
Outwith the Scope 0.00 234.60 248.70 Outwith the Scope 0.00 248.70 14.10 6%
Licences/Registration - Animal Boarding Establishments Act
1963 (Home boarding)
Vets Fees to be
added 162.70
Outwith the Scope 0.00 162.70 172.45 Outwith the Scope 0.00 172.45 9.75 6%
Licences/Registration - Zoo Act Vets Fees to be
added 1,307.05
Outwith the Scope 0.00 1,307.05 1,385.45 Outwith the Scope 0.00 1,385.45 78.40 6%
Licences/Registration - Venison Dealers
223.75
Outwith the Scope 0.00 223.75 237.20 Outwith the Scope 0.00 237.20 13.45 6%
Licences/Registration - Cinema Licence STATUTORY
CHARGE
600.00
Outwith the Scope 0.00 600.00 600.00 Outwith the Scope 0.00 600.00 0.00 0% Capped at £600 by the Cinemas Act
Charitable discount – 50%
(applies to registered Scottish Charities and
SCIOs only)
HMO - premises of up to 10 persons
1,071.80
Outwith the Scope 0.00 1,071.80  1,136.10 Outwith the Scope 0.00 1,136.10 64.30 6% Tri-Annual Licence
HMO - premises with more than 10 persons
1,311.50
Outwith the Scope 0.00 1,311.50  1,390.20 Outwith the Scope 0.00 1,390.20 78.70 6% Tri-Annual Licence
HMO- Amendment to HMO licence
158.25
Outwith the Scope 0.00 158.25     167.75 Outwith the Scope 0.00 167.75 9.50 6%
HMO - Refund if a new/renewal application is unsuccessful
268.05
Outwith the Scope 0.00 268.05 284.15 Outwith the Scope 0.00 284.15 16.10 6%
Performing Animals Licence application/renewal
150.90
Outwith the Scope 0.00 150.90 159.95 Outwith the Scope 0.00 159.95 9.05 6% Vet Fees to be added
Residential Caravan sites- first or new application
783.40
Outwith the Scope 0.00 783.40 830.40 Outwith the Scope 0.00 830.40 47.00 6% 5 year licence
Residential Caravan sites- renewal submitted before expiry
date 631.80
Outwith the Scope 0.00 631.80 669.70 Outwith the Scope 0.00 669.70 37.90 6% 5 year licence
Residential Caravan sites- renewal submitted after expiry date
783.40
Outwith the Scope 0.00 783.40 830.40 Outwith the Scope 0.00 830.40 47.00 6% 5 year licence
Residential Caravan sites- recovery of costs related to
enforcement action
Outwith the Scope 0.00 Full costs
recovery
Outwith the Scope 0.00 Full costs
recovery
Environmental Health Charge for Officer time (per hour) where
appropriate ( out of hours or weekend work incurs a 50%
surcharge on the hourly rate). 112.30
Outwith the Scope 0.00 112.30 119.05 Outwith the Scope 0.00 119.05 6.75 6%
Attestation for export business
119.10
Outwith the Scope 0.00 119.10 126.25 Outwith the Scope 0.00 126.25 7.15 6%
Additional inspections or interventions required as part of
attestation 112.30
Outwith the Scope 0.00 112.30 119.05 Outwith the Scope 0.00 119.05 6.75 6% Officer cost per hour
Private Water Supplies - Visit charge Regulated supply
95.30
Outwith the Scope 0.00 95.30 101.00 Outwith the Scope 0.00 101.00 5.70 6%
Private Water Supplies -Single visit to regulated supply with
multiple commercial properties
95.30
Outwith the Scope 0.00 95.30 101.00 Outwith the Scope 0.00 101.00 5.70 6% If more than one property on supply to be
sampled, additional £12.65 per property
applies as per line below.
Page 13 Planning, Environ Hlth & Hous
Page 115

Page 116

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2025-26 Increase2026-27
Private Water Supplies - multiple commercial properties
charge per additional property above 11.95
Outwith the Scope 0.00 11.95 12.65 Outwith the Scope 0.00 12.65 0.70 6% Charge of £12.65 for additional commercial
property sampled.
Private Water Supplies -Regulated :Analytical parameter cost
0.00
Outwith the Scope 0.00 0.00 0.00 Outwith the Scope 0.00 0.00 0.00 0% At cost
Private Water Supplies  - Zonal charge per regulated supply 17.85 Outwith the Scope 0.00 17.85 18.90 Outwith the Scope 0.00 18.90 1.05 6% Analytical costs divided by number of
regulated supplies as of 1st January in
calendar year
Private water supply-Regulated supply: Risk assessment visit
and report (up to 1 hour on site)
STATUTORY
CHARGE
132.50 Outwith the Scope 0.00 132.50 132.50 Outwith the Scope 0.00 132.50 0.00 0%
Private water supply - Regulated Supply:Review risk
assessment visit and report (up to 1 hour on site)
STATUTORY
CHARGE
125.00 Outwith the Scope 0.00 125.00 125.00 Outwith the Scope 0.00 125.00 0.00 0%
Private water supply - Regulated risk assessments  (cost per
additional hour or part thereof)
STATUTORY
CHARGE
50.00 Outwith the Scope 0.00 50.00 50.00 Outwith the Scope 0.00 50.00 0.00 0% £50 per additional hour
Private Water Supplies: Regulated supplies: desktop review of
risk assessment
STATUTORY
CHARGE
50.00 Outwith the Scope 0.00 50.00 50.00 Outwith the Scope 0.00 50.00 0.00 0%
Private Water Supplies - Visit charge Type B STATUTORY
CHARGE
70.00 Outwith the Scope 0.00 70.00 70.00 Outwith the Scope 0.00 70.00 0.00 0% Charge capped at £70.
Private Water Supplies - Type B - Monitoring & analytical cost STATUTORY
CHARGE
118.00 Outwith the Scope 0.00 118.00 118.00 Outwith the Scope 0.00 118.00 0.00 0% Charge capped at £118.
Private Water Supplies - Type B - request sample and
analytical cost
145.00 Outwith the Scope 0.00 145.00 145.00 Outwith the Scope 0.00 145.00 0.00 0% Can be set by L.A.discretionary charge
Private water supply- Initial risk assessment visit (TypeB) and
report
STATUTORY
CHARGE
120.00 Outwith the Scope 0.00 120.00 120.00 Outwith the Scope 0.00 120.00 0.00 0% Capped
Private waters (Regulated and Type B)  - Other Parameters
may be sampled if there is a specific need.  Those charges will
directly reflect those passed to us by the testing laboratory
At Cost 0.00 Outwith the Scope 0.00 0.00 0.00 Outwith the Scope 0.00 0.00 0.00 0% At Cost
Private Landlord Registration - principal fee for registration as
landlord
STATUTORY
CHARGE
82.00 Outwith the Scope 0.00 82.00 82.00 Outwith the Scope 0.00 82.00 0.00
Private Landlord Registration - property fee per property STATUTORY
CHARGE
19.00 Outwith the Scope 0.00 19.00 19.00 Outwith the Scope 0.00 19.00 0.00
Private Landlord Registration- late application fee STATUTORY
CHARGE
164.00 Outwith the Scope 0.00 164.00 164.00 Outwith the Scope 0.00 164.00 0.00
Short-term let licensing - home letting/home sharing
accommodating to 4 guests - New licence and renewal
269.15 Outwith the Scope 0.00 269.15 285.30 Outwith the Scope 0.00 285.30 16.15 6% Tri-Annual Licence
Short-term let licensing - home letting/home sharing
accommodating 5-8 guests   New licence and renewal
376.35 Outwith the Scope 0.00 376.35 398.95 Outwith the Scope 0.00 398.95 22.60 6% Tri-Annual Licence
Short-term let licensing - home letting/home sharing
accommodating 9 -12 guests  New licence and renewal
591.90 Outwith the Scope 0.00 591.90 627.40 Outwith the Scope 0.00 627.40 35.50 6% Tri-Annual Licence
Short-term let licensing - home letting/home sharing
accommodating 13-20 guests   New licence and renewal
753.90 Outwith the Scope 0.00 753.90 799.15 Outwith the Scope 0.00 799.15 45.25 6% Tri-Annual Licence
Short-term let licensing - home letting/home sharing
accommodating 21 and over guests New licence and renewal
969.50 Outwith the Scope 0.00 969.50 1,027.65 Outwith the Scope 0.00 1,027.65 58.15 6% Tri-Annual Licence
Short-term let licensing - secondary letting accommodating up
to 4 guests New licence and renewal
376.35 Outwith the Scope 0.00 376.35 398.95 Outwith the Scope 0.00 398.95 22.60 6% Tri-Annual Licence
Short-term let licensing - secondary letting accommodating
accommodating 5-8 guests New licence and renewal
538.30 Outwith the Scope 0.00 538.30 570.60 Outwith the Scope 0.00 570.60 32.30 6% Tri-Annual Licence
Short-term let licensing - secondary letting accommodating 9 -
12 guests New licence and renewal
807.50 Outwith the Scope 0.00 807.50 855.95 Outwith the Scope 0.00 855.95 48.45 6% Tri-Annual Licence
Short-term let licensing - secondary letting accommodating 13-
20 guests New licence and renewal
1,076.70 Outwith the Scope 0.00 1,076.70 1,141.30 Outwith the Scope 0.00 1,141.30 64.60 6% Tri-Annual Licence
Short-term let licensing - secondary letting accommodating 21
and over guests New licence and renewal
1,345.85 Outwith the Scope 0.00 1,345.85 1,426.60 Outwith the Scope 0.00 1,426.60 80.75 6% Tri-Annual Licence
Short-term let licensing- Variation in Licence/change in
circumstances
91.70 Outwith the Scope 0.00 91.70 97.20 Outwith the Scope 0.00 97.20 5.50 6%
Scottish Government prescribe these charges
for Local Authorities to apply
Page 14 Planning, Environ Hlth & Hous
Page 116

Page 117

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2025-26 Increase2026-27
Short-term let licensing- Certified copy of licence/duplicate
licence
48.80 Outwith the Scope 0.00 48.80 51.75 Outwith the Scope 0.00 51.75 2.95 6%
Short-term let licensing - Enforcement charge (Hourly rate) 112.30 Outwith the Scope 0.00 112.30 119.05 Outwith the Scope 0.00 119.05 6.75 6%
Short-term let Licensing:  Confirmation of a provisional STL
licence application
212.00 Outwith the Scope 0.00 212.00 224.70 Outwith the Scope 0.00 224.70 12.70 6%
Short-term let Licensing: Application to extend provisional
short-term let licence
91.70 Outwith the Scope 0.00 91.70 97.20 Outwith the Scope 0.00 97.20 5.50 6%
Short-term let Licensing: Transfer of a licence
91.70 Outwith the Scope 0.00 91.70 97.20 Outwith the Scope 0.00 97.20 5.50 6%
Short-term let licensing: Application for provisional licence -
home letting/home sharing accommodating to 4 guests
42.30 Outwith the Scope 0.00 42.30 44.85 Outwith the Scope 0.00 44.85 2.55 6%
Short-term let licensing: Application for provisional licence -
home letting/home sharing accommodating 5-8 guests
143.15 Outwith the Scope 0.00 143.15 151.75 Outwith the Scope 0.00 151.75 8.60 6%
Short-term let licensing  Application for provisional licence -
home letting/home sharing accommodating 9 -12 guests
379.90 Outwith the Scope 0.00 379.90 402.70 Outwith the Scope 0.00 402.70 22.80 6%
Short-term let licensing: Application for provisional licence -
home letting/home sharing accommodating 13-20 guests
541.90 Outwith the Scope 0.00 541.90 574.40 Outwith the Scope 0.00 574.40 32.50 6%
Short-term let licensing: Application for provisional licence-
home letting/home sharing accommodating 21 and over
guests
757.50 Outwith the Scope 0.00 757.50 802.95 Outwith the Scope 0.00 802.95 45.45 6%
Short-term let licensing : Application for provisional licence-
secondary letting accommodating up to 4 guests
164.35 Outwith the Scope 0.00 164.35 174.20 Outwith the Scope 0.00 174.20 9.85 6%
Short-term let licensing: Application for provisional licence -
secondary letting accommodating  5-8 guests
326.30 Outwith the Scope 0.00 326.30 345.90 Outwith the Scope 0.00 345.90 19.60 6%
Short-term let licensing: Application for provisional licence -
secondary letting accommodating 9 -12 guests
595.50 Outwith the Scope 0.00 595.50 631.25 Outwith the Scope 0.00 631.25 35.75 6%
Short-term let licensing: Application for provisional licence -
secondary letting accommodating 13-20 guests
864.70 Outwith the Scope 0.00 864.70 916.60 Outwith the Scope 0.00 916.60 51.90 6%
Short-term let licensing: Application for provisional licence -
secondary letting accommodating 21 and over guests
1,133.85 Outwith the Scope 0.00 1,133.85 1,201.90 Outwith the Scope 0.00 1,201.90 68.05 6%
Environmental Health Section 50 Licence Certificate 176.00 Outwith the Scope 0.00 176.00 187.00 Outwith the Scope 0.00 187.00 11.00 6%
PLANNING SERVICES
Additional administration fee in respect of an Advert required
in terms of Regulation 20 of the Town & Country Planning
(Development Management Procedure) (Scotland)
Regulations 2008
207.50 Standard 41.50 249.00 220.00 Standard 44.00 264.00 15.00 6%
Planning Section 50 Licence Certificate 176.00 Outwith the Scope 0.00 176.00 187.00 Outwith the Scope 0.00 187.00 11.00 6%
Pre Application advice for major planning applications 992.50 Standard 198.50 1,191.00 1,051.67 Standard 210.33 1,262.00 71.00 6%
Pre Application advice for local planning applications Maximum £899 794.17 Standard 158.83 953.00 841.67 Standard 168.33 1,010.00 57.00 6%
Pre-Application Initiation & follow up 30min meeting 37.50 Standard 7.50 45.00 40.00 Standard 8.00 48.00 3.00 7% includes 20min prep and 10 mins follow up
Pre-Application Initiation & follow up 1hour meeting 75.83 Standard 15.17 91.00 80.00 Standard 16.00 96.00 5.00 5% includes 40min prep and 20 mins follow up
Pre-Application Initiation & follow up 2hour meeting 115.00 Standard 23.00 138.00 121.67 Standard 24.33 146.00 8.00 6% includes 40min prep and 20 mins follow up
High Hedge complaint 569.00 Outwith the Scope 0.00 569.00 603.00 Outwith the Scope 0.00 603.00 34.00 6% £50 charge if investigated but not classed as
a hedge
Page 15 Planning, Environ Hlth & Hous
Page 117

Page 118

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2025-26 Increase2026-27
Administration Charge for non e-Planning application
submissions - Householder Application
24.50 Outwith the Scope 0.00 24.50 26.00 Outwith the Scope 0.00 26.00 1.50 6% Exemptions to this charge will be applied
where submissions cannot be made through
the ePlanning portal including:
- Pre-application Screening Notice;
- Proposal of Application Notice;
- Applications for modification or discharge of
planning obligations under s75A;
- Applications for marine fish farm
development;
- Applications for a High Hedge Notice;
Administration Charge for non e-Planning application
submissions - Non-Householder Local Application
61.50 Outwith the Scope 0.00 61.50 65.00 Outwith the Scope 0.00 65.00 3.50 6%
Administration Charge for non e-Planning application
submissions - Major Application
123.00 Outwith the Scope 0.00 123.00 130.00 Outwith the Scope 0.00 130.00 7.00 6%
Property History Search - Copy Document Record Search
where specific planning application reference required is
provided
46.00 Outwith the Scope 0.00 46.00 49.00 Outwith the Scope 0.00 49.00 3.00 7% Additional printing charges will be applied for
provision of hardcopy documentation; no fee
for provision of e-copy
Property History Search - Copy Document Record Search
where specific planning application reference is not provided
107.00 Outwith the Scope 0.00 107.00 113.00 Outwith the Scope 0.00 113.00 6.00 6%
Planning Statutory Fees
Surcharge for retrospective planning permission
25% of  planning fee
25% of  planning fee
Admin Charge for return of invalid application 50.00 Outwith the Scope 0.00 50.00 50.00 Outwith the Scope 0.00 50.00 0.00 0%
BUILDING STANDARDS 
Property Inspection 443.00 Outwith the Scope 0.00 443.00 470.00 Outwith the Scope 0.00 470.00 27.00 6%
Re - Inspection Fee Property Inspection Applications 220.00 Outwith the Scope 0.00 220.00 233.00 Outwith the Scope 0.00 233.00 13.00 6%
Confirmation of completion Applications 354.00 Outwith the Scope 0.00 354.00 375.00 Outwith the Scope 0.00 375.00 21.00 6%
Re - Inspection Fee Confirmation of Completion Applications 202.00 Outwith the Scope 0.00 202.00 214.00 Outwith the Scope 0.00 214.00 12.00 6%
Confirmation of Exempt class of works 90.00 Outwith the Scope 0.00 90.00 95.00 Outwith the Scope 0.00 95.00 5.00 6%
Building Standards Section 50 Licence Certificate 176.00 Outwith the Scope 0.00 176.00 187.00 Outwith the Scope 0.00 187.00 11.00 6%
Property Enquiries (if Application Number known) 52.00 Outwith the Scope 0.00 52.00 55.00 Outwith the Scope 0.00 55.00 3.00 6%
Property Enquiries (if Application Number not known) 127.00 Outwith the Scope 0.00 127.00 135.00 Outwith the Scope 0.00 135.00 8.00 6%
Building Standards Statutory Fees
https://www.ebuildingstandards.scot/eBuildi
ngStandardsClient/custompages/feecalculato
r.aspx
HOUSING
Housing - Homeless Temporary Accommodation - Bedsit/1
Bed - per week 57.06 Outwith the Scope 0.00 57.06 57.06 Outwith the Scope 0.00 57.06 0.00 0%
Housing - Homeless Temporary Accommodation - 2 Bed
Flat/House - per week 64.62 Outwith the Scope 0.00 64.62 64.62 Outwith the Scope 0.00 64.62 0.00 0%
Housing - Homeless Temporary Accommodation - 3 Bed
Flat/House - per week 71.37 Outwith the Scope 0.00 71.37 71.37 Outwith the Scope 0.00 71.37 0.00 0%
Housing - Homeless Temporary Accommodation - 4 Bed
House - per week 76.67 Outwith the Scope 0.00 76.67 76.67 Outwith the Scope 0.00 76.67 0.00 0%
Housing - Homeless Tenants Service Charge per week 59.95 Outwith the Scope 0.00 59.95 63.55 Outwith the Scope 0.00 63.55 3.60 6%
Not subject to inflation - only the service
charge is inflated.
Page 16 Planning, Environ Hlth & Hous
Page 118

Page 119

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
WASTE COLLECTION
Supply of Sacks for Commercial Use (pack of 50) 426.90 Outwith the Scope 0.00 426.90 452.50
Outwith the
Scope 0.00 452.50 25.60 6%
Confidential Sacks - Includes Uplift, Shredding and disposal
Internal Use Only
- Minimum of 8
sacks per order 19.60 Outwith the Scope 0.00 19.60 20.80
Outwith the
Scope 0.00 20.80 1.20 6%
Domestic Use Only 140 Litre Bins 44.65 Outwith the Scope 0.00 44.65 47.35
Outwith the
Scope 0.00 47.35 2.70 6%
Domestic Use Only 240 Litre Bins 44.65 Outwith the Scope 0.00 44.65 47.35
Outwith the
Scope 0.00 47.35 2.70 6%
Commercial Use Only 240 Litre Bins 114.08 Standard 22.82 136.90 120.92 Standard 24.18 145.10 8.20 6%
Commercial Use Only 360 Litre Bins 165.96 Standard 33.19 199.15 175.92 Standard 35.18 211.10 11.95 6%
Commercial Use Only 660 Litre Bins 418.58 Standard 83.72 502.30 443.71 Standard 88.74 532.45 30.15 6%
Commercial Use Only 1100 Litre Bins 509.83 Standard 101.97 611.80 540.42 Standard 108.08 648.50 36.70 6%
Commercial Use Only 1280 Litre Bins 525.04 Standard 105.01 630.05 556.54 Standard 111.31 667.85 37.80 6%
Householder Special Refuse Collection
Minimum Charge
covers work of two
men and vehicle
up to ten minutes. 85.75 Outwith the Scope 0.00 85.75 90.90
Outwith the
Scope 0.00 90.90 5.15 6%
Householder Special Refuse Collection Extra Charge
Charged per 10
minutes over
minimum charge 53.35 Outwith the Scope 0.00 53.35 56.55
Outwith the
Scope 0.00 56.55 3.20 6%
Commercial Special Uplift (Industrial Waste)
(Charge Per Hour -
Minimum Charge
1 hour) 188.63 Standard 37.73 226.35 199.96 Standard 39.99 239.95 13.60 6%
Commercial Special Uplift (Non-industrial Waste)
(Charge Per Hour -
Minimum Charge
1 hour) - Housing
Associations
should be
charged at this
rate. 188.65 Outwith the Scope 0.00 188.65 199.95
Outwith the
Scope 0.00 199.95 11.30 6%
Provided not Industrial waste as per
Environmental Protection Act 1990. For
commercial fridge/freezer disposal, contact
the Waste Team for advice.
Return of Supermarket trolleys (each) 52.71 Standard 10.54 63.25 55.88 Standard 11.18 67.05 3.80 6%
COMMERCIAL REFUSE
Wheeled Bins - 140/240 ltr
Based on 1 uplift
per week 509.15 Outwith the Scope 0.00 509.15 539.69
Outwith the
Scope 0.00 539.69 30.55 6%
Minimum Charge 2026/27 - £545.91
Equivalent to the 140/240 litre bin charge
for collection and landfill tax uplifted once a
week.
Wheeled Bins - 340 ltr
Based on 1 uplift
per week 721.20 Outwith the Scope 0.00 721.20 764.47
Outwith the
Scope 0.00 764.47 43.27 6%
Wheeled Bins - 660 ltr
Based on 1 uplift
per week 1,383.81 Outwith the Scope 0.00 1,383.81 1,466.84
Outwith the
Scope 0.00 1,466.84 83.03 6%
Wheeled Bins - 800 ltr
Based on 1 uplift
per week 1,677.32 Outwith the Scope 0.00 1,677.32 1,777.95
Outwith the
Scope 0.00 1,777.95 100.64 6%
Wheeled Bins - 1100 ltr
Based on 1 uplift
per week 2,305.36 Outwith the Scope 0.00 2,305.36 2,443.68
Outwith the
Scope 0.00 2,443.68 138.32 6%
Wheeled Bins - 1280 ltr
Based on 1 uplift
per week 2,682.52 Outwith the Scope 0.00 2,682.52 2,843.47
Outwith the
Scope 0.00 2,843.47 160.95 6%
Loads - Bands 1-5 1,237.60 Outwith the Scope 0.00 1,237.60 1,311.85
Outwith the
Scope 0.00 1,311.85 74.26 6%
Loads - Bands 6-10 2,788.74 Outwith the Scope 0.00 2,788.74 2,956.07
Outwith the
Scope 0.00 2,956.07 167.32 6%
Front End Loader Service - Uplifted twice weekly by Biffa Per Cubic Yard 2,709.82 Outwith the Scope 0.00 2,709.82 2,872.41
Outwith the
Scope 0.00 2,872.41 162.59 6%
Front End Loader Service - Uplifted twice weekly by Biffa Per Cubic Metre 3,199.02 Outwith the Scope 0.00 3,199.02 3,390.96
Outwith the
Scope 0.00 3,390.96 191.94 6%
Pull Out Charge - Commercial only 126.36 Outwith the Scope 0.00 126.36 133.94
Outwith the
Scope 0.00 133.94 7.58 6% This charge is per bin.
For premises whereby a less than weekly
mixed waste service is available only, the
minimum charge will be adjusted
accordingly.
Agreements are issued Annually to  all
commercial/front end loader customers. 
Payments are either made in advance or by
direct debit.
Front End Loader service provided by Biffa.
Some bins still responsibility of Council
dependant on location and recognised use
by public.  Any charge by Biffa above this
level to be charged at cost + 2% to
customers.
2025-26 Increase2026-27
Page 17 Waste Management
Page 119

Page 120

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2025-26 Increase2026-27
COMMERCIAL REFUSE (private waste contractor's with
Council acting as sub-contractor)
Supply of Sacks for Commercial Use (pack of 50) 426.91 Standard 85.38 512.29 452.52 Standard 90.50 543.03 30.74 6%
Minimum Charge 2026/27 - £655.09
Equivalent to the 140/240 litre bin charge
for collection and landfill tax uplifted once a
week.
Wheeled Bins - 140/240 ltr
Based on 1 uplift
per week 509.15 Standard 101.83 610.98 539.70 Standard 107.94 647.64 36.66 6%
Wheeled Bins - 340 ltr
Based on 1 uplift
per week 721.20 Standard 144.24 865.45 764.48 Standard 152.90 917.37 51.93 6%
Wheeled Bins - 660 ltr
Based on 1 uplift
per week 1,383.81 Standard 276.76 1,660.58 1,466.84 Standard 293.37 1,760.21 99.63 6%
Wheeled Bins - 800 ltr
Based on 1 uplift
per week 1,677.32 Standard 335.46 2,012.79 1,777.96 Standard 355.59 2,133.56 120.77 6%
Wheeled Bins - 1100 ltr
Based on 1 uplift
per week 2,305.36 Standard 461.07 2,766.43 2,443.68 Standard 488.74 2,932.42 165.99 6%
Wheeled Bins - 1280 ltr
Based on 1 uplift
per week 2,682.52 Standard 536.50 3,219.02 2,843.47 Standard 568.69 3,412.16 193.14 6%
Loads - Bands 1-5 1,237.60 Standard 247.52 1,485.12 1,311.86 Standard 262.37 1,574.23 89.11 6%
Loads - Bands 6-10 2,788.74 Standard 557.75 3,346.49 2,956.06 Standard 591.21 3,547.28 200.79 6%
Front End Loader Service - Uplifted twice weekly by Biffa Per Cubic Yard 2,709.82 Standard 541.96 3,251.79 2,872.41 Standard 574.48 3,446.89 195.11 6%
Front End Loader Service - Uplifted twice weekly by Biffa Per Cubic Metre 3,199.02 Standard 639.80 3,838.82 3,390.96 Standard 678.19 4,069.15 230.33 6%
Pull Out Charge - Commercial only 126.36 Standard 25.27 151.63 133.94 Standard 26.79 160.73 9.10 6% This charge is per bin.
RECYCLING CHARGES
Office Paper - Large Bag / 1 x week 189.07 Outwith the Scope 0.00 189.07 200.42
Outwith the
Scope 0.00 200.42 11.34 6%
Paper, Cardboard, Plastic and Cans - 240 litre Bins and
Minimum Charge for Year 125.37 Outwith the Scope 0.00 125.37 132.89
Outwith the
Scope 0.00 132.89 7.52 6%
Paper, Cardboard, Plastic and Cans - 340 litre Bin 176.71 Outwith the Scope 0.00 176.71 187.31
Outwith the
Scope 0.00 187.31 10.60 6%
Paper, Cardboard, Plastic and Cans - 660 litre Bin 338.07 Outwith the Scope 0.00 338.07 358.36
Outwith the
Scope 0.00 358.36 20.28 6%
Paper, Cardboard, Plastic and Cans - 800 litre Bin 409.81 Outwith the Scope 0.00 409.81 434.40
Outwith the
Scope 0.00 434.40 24.59 6%
Paper, Cardboard, Plastic and Cans - 1100/1280 litre Bin 562.22 Outwith the Scope 0.00 562.22 595.96
Outwith the
Scope 0.00 595.96 33.73 6%
Commercial Sacks for Recyclable Waste
Charge Per Sack.
Service available
in Kintyre and only
sold and used
when no space for
a blue bin. 1.88 Outwith the Scope 0.00 1.88 1.99
Outwith the
Scope 0.00 1.99 0.11 6%
Recyclable Waste Brought to Civic Amenity/Recycling
Facilities
Purchase of
Punch Card -
Price per card 54.87 Outwith the Scope 0.00 54.87 58.17
Outwith the
Scope 0.00 58.17 3.29 6%
Cooking Oil Collection (per 20/24ltr container)
Service available
in Mull, Iona,
Tiree, Islay and
Jura 4.58 Outwith the Scope 0.00 4.58 4.85
Outwith the
Scope 0.00 4.85 0.27 6%
Commercial Wood Delivered by Contractors
Island waste
disposal sites on
Mull, Islay and
Tiree 138.92 Outwith the Scope 0.00 138.92 147.26
Outwith the
Scope 0.00 147.26 8.34 6%
Segregated Glass Collection - 240 litre bin 1 x weekly 78.90 Outwith the Scope 0.00 78.90 83.64
Outwith the
Scope 0.00 83.64 4.73 6%
Charges for recycling collections or
treatment should in general be levied on
the commercial sector on the same basis
as normal refuse collection or disposal, but
with the benefit of no landfill tax payment
being applied to the charge.
At Waste Disposal Sites and Civic
Amenity/Recycling Sites, use by the
commercial sector (if permitted by the 
license conditions) should only be allowed
in return for the payment of the appropriate
rate, equivalent to the disposal charge
excluding landfill tax. A pre-paid punch card
system is available. There are some
exceptions to this e.g. commercial wood
from Council operated island waste
disposal sites, where high haulage costs
are incurred and an appropriate charge is
levied to cover this.
Fortnightly Charge
- Weekly services
shall be charged
accordingly at
fortnightly rate x 2
Minimum Charge
same as for Mixed
Glass
For premises whereby a less than weekly
mixed waste service is available only, the
minimum charge will be adjusted
accordingly.
Agreements are issued Annually to  all
commercial/front end loader customers. 
Payments are either made in advance or by
direct debit.
Front End Loader service provided by Biffa.  
Some bins still responsibility of Council
dependant on location and recognised use
by public.  Any charge by Biffa above this
level to be charged at cost + 2% to
customers.
Page 18 Waste Management
Page 120

Page 121

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2025-26 Increase2026-27
Segregated Glass Collection - 330/360 litre bin 1 x weekly 108.70 Outwith the Scope 0.00 108.70 115.23
Outwith the
Scope 0.00 115.23 6.52 6%
Segregated Glass Collection - 660 litre bin 1 x weekly 213.88 Outwith the Scope 0.00 213.88 226.72
Outwith the
Scope 0.00 226.72 12.83 6%
Segregated Glass Collection - 1100/1280 litre bin 1 x weekly 322.44 Outwith the Scope 0.00 322.44 341.78
Outwith the
Scope 0.00 341.78 19.35 6%
Mixed Glass Collection - 240 litre bin and Minimum Charge 119.52 Outwith the Scope 0.00 119.52 126.69
Outwith the
Scope 0.00 126.69 7.17 6%
Mixed Glass Collection - 660 litre bin 322.44 Outwith the Scope 0.00 322.44 341.78
Outwith the
Scope 0.00 341.78 19.35 6%
Mixed Glass Collection - 1100 litre bin 483.65 Outwith the Scope 0.00 483.65 512.67
Outwith the
Scope 0.00 512.67 29.02 6%
Commercial Food Waste Composting Service - Weekly
Service of 140ltr Wheeled Bin
Service only
available in
Lomond - Bin and
160 Bags per
annum supplied
by Council 206.36 Outwith the Scope 0.00 206.36 218.74
Outwith the
Scope 0.00 218.74 12.38 6%
Commercial Food Waste Composting Service - Weekly
Service of 240ltr Wheeled Bin
Service only
available in
Lomond - Bin and
160 Bags per
annum supplied
by Council 353.70 Outwith the Scope 0.00 353.70 374.93
Outwith the
Scope 0.00 374.93 21.22 6%
Commercial Food Waste Composting Service - Weekly
Service of 500ltr Wheeled Bin
Service only
available in
Lomond - Bin and
570 Bags per
annum supplied
by Council 737.60 Outwith the Scope 0.00 737.60 781.86
Outwith the
Scope 0.00 781.86 44.26 6%
RECYCLING CHARGES (private waste contractor's with
Council acting as sub-contractor)
Office Paper - Large Bag / 1 x week 189.07 Standard 37.81 226.88 200.42 Standard 40.08 240.50 13.62 6%
Paper, Cardboard, Plastic and Cans - 240 litre Bins and
Minimum Charge for Year 125.37 Standard 25.07 150.45 132.89 Standard 26.58 159.46 9.02 6%
Paper, Cardboard, Plastic and Cans - 340 litre Bin 176.71 Standard 35.34 212.05 187.31 Standard 37.46 224.77 12.72 6%
Paper, Cardboard, Plastic and Cans - 660 litre Bin 338.07 Standard 67.61 405.68 358.36 Standard 71.67 430.04 24.35 6%
Paper, Cardboard, Plastic and Cans - 800 litre Bin 409.81 Standard 81.96 491.78 434.40 Standard 86.88 521.28 29.51 6%
Paper, Cardboard, Plastic and Cans - 1100/1280 litre Bin 562.22 Standard 112.44 674.66 595.96 Standard 119.19 715.15 40.49 6%
Commercial Sacks for Recyclable Waste
Charge Per Sack.
Service available
in Kintyre and only
sold and used
when no space for
a blue bin. 1.88 Standard 0.38 2.25 1.99 Standard 0.40 2.39 0.14 6%
Segregated Glass Collection - 240 litre bin 1 x weekly 78.90 Standard 15.78 94.68 83.64 Standard 16.73 100.37 5.68 6%
Segregated Glass Collection - 330/360 litre bin 1 x weekly 108.70 Standard 21.74 130.44 115.23 Standard 23.05 138.27 7.83 6%
Fortnightly Charge
- Weekly services
shall be charged
accordingly at
fortnightly rate x 2
Minimum Charge
same as for Mixed
Glass
Charges for recycling collections or
treatment should in general be levied on
the commercial sector on the same basis
as normal refuse collection or disposal, but
with the benefit of no landfill tax payment
being applied to the charge.
At Waste Disposal Sites and Civic
Amenity/Recycling Sites, use by the
commercial sector (if permitted by the 
license conditions) should only be allowed
in return for the payment of the appropriate
rate, equivalent to the disposal charge
excluding landfill tax. A pre-paid punch card
system is available. There are some
exceptions to this e.g. commercial wood
from Council operated island waste
disposal sites, where high haulage costs
are incurred and an appropriate charge is
levied to cover this.
Minimum Charge
same as for Mixed
Glass
Fortnightly Charge
for Isles of Mull,
Iona, Tiree and
Islay
Page 19 Waste Management
Page 121

Page 122

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2025-26 Increase2026-27
Segregated Glass Collection - 660 litre bin 1 x weekly 213.88 Standard 42.78 256.65 226.72 Standard 45.34 272.06 15.41 6%
Segregated Glass Collection - 1100/1280 litre bin 1 x weekly 322.44 Standard 64.49 386.93 341.78 Standard 68.36 410.14 23.21 6%
Mixed Glass Collection - 240 litre bin and Minimum Charge 119.52 Standard 23.90 143.42 126.67 Standard 25.33 152.00 8.58 6%
Mixed Glass Collection - 660 litre bin 322.44 Standard 64.49 386.93 341.78 Standard 68.36 410.14 23.21 6%
Mixed Glass Collection - 1100 litre bin 483.65 Standard 96.73 580.38 512.67 Standard 102.53 615.20 34.82 6%
Commercial Food Waste Composting Service - Weekly
Service of 140ltr Wheeled Bin
Service only
available in
Lomond - Bin and
160 Bags per
annum supplied
by Council 206.36 Standard 41.27 247.64 218.74 Standard 43.75 262.48 14.85 6%
Commercial Food Waste Composting Service - Weekly
Service of 240ltr Wheeled Bin
Service only
available in
Lomond - Bin and
160 Bags per
annum supplied
by Council 353.70 Standard 70.74 424.44 374.93 Standard 74.99 449.91 25.48 6%
Commercial Food Waste Composting Service - Weekly
Service of 500ltr Wheeled Bin
Service only
available in
Lomond - Bin and
570 Bags per
annum supplied
by Council 737.60 Standard 147.52 885.11 781.86 Standard 156.37 938.23 53.12 6%
SKIPS
Hire (for 24 hours)
Any Ferry
Journeys will be
recharged at cost. 7.25 Standard 1.45 8.70 7.67 Standard 1.53 9.20 0.50 6%
Charge for skip hire if not part of
commercial waste collection contract.
Commercial - Service of Skip - Up to 10 miles travel, one way
from disposal point
Any Ferry
Journeys will be
recharged at cost. 95.00 Outwith the Scope 0.00 95.00 100.70
Outwith the
Scope 0.00 100.70 5.70 6%
Commercial - Service of Skip - Up to 20 miles travel, one way
from disposal point
Any Ferry
Journeys will be
recharged at cost. 120.65 Outwith the Scope 0.00 120.65 127.90
Outwith the
Scope 0.00 127.90 7.25 6%
Commercial - Service of Skip - Over 20 miles travel, one way
from disposal point
Any Ferry
Journeys will be
recharged at cost. 149.25 Outwith the Scope 0.00 149.25 158.20
Outwith the
Scope 0.00 158.20 8.95 6%
Commercial - Tipping Charge per Service, including Landfill
Tax (Active)
Tiree Only - See
notes 449.55 Outwith the Scope 0.00 449.55 468.45
Outwith the
Scope 0.00 468.45 18.90 4%
Commercial - Tipping Charge per Service, including Landfill
Tax (Inactive)
Tiree Only - See
notes 0.00 Outwith the Scope 0.00 0.00 0.00
Outwith the
Scope 0.00 0.00 0.00 0%
Minimum Charge
same as for Mixed
Glass
Fortnightly Charge
for Isles of Mull,
Iona, Tiree and
Islay
Landfill tax on inactive waste at Council
landfill sites on Mull, Islay and Tiree may be
charged.  This will depend on the type of
inactive waste and it’s use on the landfill
site.  A contractor with such waste should
contact the Council to discuss this prior to
disposal of inactive waste.
Tipping Charges - Tiree, no weighbridge,
charges based on assumed weights based
on vehicle size.
Tipping Charges - Islay and Mull - charge
based on weighbridge - see Waste
Disposal Charges.
Page 20 Waste Management
Page 122

Page 123

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2025-26 Increase2026-27
HOUSEHOLDER SCRAP CAR REMOVAL AND DISPOSAL
SERVICE (Service not available to Commercial
Customers they should make their own arrangements
with appropriate vehicle dismantlers)
Scrap Car Deposit Voucher - per car
The voucher
service is not
available in
Helensburgh and
Lomond, where
advice can be
sought from your
local area office.  105.46 Standard 21.09 126.55 111.79 Standard 22.36 134.15 7.60 6%
Householder must pay fee and show
registration document as proof of ownership
before voucher can be issued.  Car must
be taken to appropriate Council or Biffa
disposal site by Householder.
Removal and disposal from householders 266.67 Standard 53.33 320.00 282.67 Standard 56.53 339.20 19.20 6%
Householders should be advised of
national takeback schemes i.e.
Cartakeback and Autogreen, before
proceeding with removal request and
payment.
Removal of abandoned car where owner can be traced -
Statutory Fee 300.00 Outwith the Scope 0.00 300.00 300.00
Outwith the
Scope 0.00 300.00 0.00 0%
Charge set by Legislation. If car has to be
stored due to its condition (e.g. still taxed) in
Council Depot an additional  £20.60 per
storage charge per day should be added.
Removal of car by arrangement on private, or other public
sector ground, where the last registered keeper cannot be
traced. The Executive Director of the Development and
Infrastructure Department shall have the discretion to require
a payment in advance from the landowner 320.00 Outwith the Scope 0.00 320.00 339.20
Outwith the
Scope 0.00 339.20 19.20 6%
A 24 hour notice on the car must be served
prior to removal and disposal.
WASTE DISPOSAL
Ordinary Waste - Landfill Tax Element of Charges per tonne
(Fee set by Scottish Government)
Charge includes
Landfill Tax 126.15 Outwith the Scope 0.00 126.15 130.75
Outwith the
Scope 0.00 130.75 4.60 4%
Ordinary Waste - Waste Disposal Cost per tonne
Charge includes
Landfill Tax 166.50 Outwith the Scope 0.00 166.50 173.50
Outwith the
Scope 0.00 173.50 7.00 4%
Inactive Waste - Landfill Tax Element of Charges per tonne
Charge includes
Landfill Tax 4.05 Outwith the Scope 0.00 4.05 8.65
Outwith the
Scope 0.00 8.65 4.60 114%
Inactive Waste - Waste Disposal Cost per tonne
Charge includes
Landfill Tax 0.00 Outwith the Scope 0.00 0.00 0.00
Outwith the
Scope 0.00 0.00 0.00 0%
Assumed Loads per vehicle type - Small Van/pick up (Escort
size) 0.4 tonnes 68.15 Outwith the Scope 0.00 68.15 71.05
Outwith the
Scope 0.00 71.05 2.90 4%
Assumed Loads per vehicle type - Medium Van/pick up
(Transit size) 0.8 tonnes 135.95 Outwith the Scope 0.00 135.95 141.75
Outwith the
Scope 0.00 141.75 5.80 4%
Assumed Loads per vehicle type - Large Van/pick up (twin
wheeled) 1.2 tonnes 203.85 Outwith the Scope 0.00 203.85 212.50
Outwith the
Scope 0.00 212.50 8.65 4%
Assumed Loads per vehicle type - Tipper/Large Box Van
(over 3.5 tonnes and less than 7.5 tonnes) 3 tonnes 509.80 Outwith the Scope 0.00 509.80 531.50
Outwith the
Scope 0.00 531.50 21.70 4%
Page 21 Waste Management
Page 123

Page 124

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
PUBLIC CONVENIENCES
Entrance Fee (where Public Convenience entry system fitted) 0.50 Outwith the Scope 0.00 0.50 0.50
Outwith the
Scope 0.00 0.50 0.00 0%
Radar Keys 5.20 Outwith the Scope 0.00 5.20 5.50
Outwith the
Scope 0.00 5.50 0.30 6%
Purchased at Area Offices.
PEST CONTROL
Eradication of rats and mice, this covers all individual dwelling
premises either private or rented from Housing Associations,
Social Landlords, Private Landlords or Commercial premises. 182.33 Standard 36.47 218.80 193.25 Standard 38.65 231.90 13.10 6%
Eradication of rats and mice. Charge for third visit (if required)
for individual dwelling premises either private or rented from
Housing Associations, Social Landlords, Private Landlords or
Commercial premises. 91.17 Standard 18.23 109.40 96.60 Standard 19.32 115.92 6.52 6%
Eradication of rats and mice for Council owned properties.  182.30 Outwith the Scope 0.00 182.30 193.25
Outwith the
Scope 0.00 193.25 10.95 6%
Eradication of rate and mice. Charge for third visit
(if required) Council owned properties. 91.15 Outwith the Scope 0.00 91.15 96.60
Outwith the
Scope 0.00 96.60 5.45 6%
Eradication of wasps and ants, this covers all individual 
dwelling premises either private or rented from Housing
Associations, Social Landlords, Private Landlords or
Commercial premises. 139.92 Standard 27.98 167.90 148.30 Standard 29.66 177.96 10.06 6%
Eradication of wasps and ants for Council owned properties.  139.90 Outwith the Scope 0.00 139.90 148.30
Outwith the
Scope 0.00 148.30 8.40 6%
Eradication of fleas and bed bugs, this covers all individual
dwelling premises either private or rented from Housing
Associations, Social Landlords, Private Landlords or
Commercial premises.
Minimum fee listed
only 685.15 Standard 137.03 822.18 726.25 Standard 145.25 871.50 49.32 6%
Eradication of fleas and bed bugs for Council owned
properties.
Minimum fee listed
only 685.15 Outwith the Scope 0.00 685.15 726.25
Outwith the
Scope 0.00 726.25 41.10 6%
Eradication of moles for Council owned land only 685.15 0.00 685.15 726.25
Outwith the
Scope 0.00 726.25 41.10 6%
Works to be carried out only on Council
owned land due to nature of control.
Non refundable survey charge 58.71 Standard 11.74 70.45 62.25 Standard 12.45 74.70 4.25 6%
If works progress to a contract/work
agreement, the survey fee can be
discounted from the costs of the works.
DOG FEES
Standard Fee 31.60 Outwith the Scope 0.00 31.60 33.50
Outwith the
Scope 0.00 33.50 1.90 6%
Boarding fee 22.25 Outwith the Scope 0.00 22.25 23.60
Outwith the
Scope 0.00 23.60 1.35 6%
Kennel Inoculation Fee 52.42 Standard 10.48 62.90 55.54 Standard 11.11 66.65 3.75 6%
Dog microchipping 46.21 Standard 9.24 55.45 49.00 Standard 9.80 58.80 3.35 6%
2025-26 Increase2026-27
Payment must be made in advance.  The
charge includes 2 visits.  Further charges 
during the initial treatment may be
necessary where eradication requires more
that 2 visits.  Advice on the total charge for
eradication can be provided by officers.
Payment must be made in advance. The
charge includes 1 visit. Further charges may
be necessary where eradication requires
additional visits. Advice on the total charge
for eradication can be provided by officers
during the initial treatment.
The cost of this service would be agreed
with the customer at the time of the survey.
Payment in advance. Proof of identity must
be shown at the Area Office when payment
is made.  A receipt will be issued to allow
the owner to collect their dog from the
kennels.  In order for Kennel Operators to
accept dogs there is a requirement that they
are inoculated.
First 24 hour period, statutory charge
applied plus boarding fee. The boarding fee
only, will be applied for each subsequent
day the dog is in boardings.
Dog microchipping is required by law since
April 2016.  Dogs (when not already
microchipped) will be microchipped before
returning to the owner.
Page 22 Amenities
Page 124

Page 125

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2025-26 Increase2026-27
Room Hire - Hermitage Park Pavilion
Hermitage Park Pavilion Community Room 
(Concession rate per hour Monday to Friday) 21.33 Standard 4.27 25.60 22.63 Standard 4.53 27.15 1.55 6%
Hermitage Park Pavilion Community Room
(Concession rate per hour Saturday and Sunday) 27.33 Standard 5.47 32.80 28.96 Standard 5.79 34.75 1.95 6%
Hermitage Park Pavilion Community Room
(Commercial rate per hour Monday to Friday) 26.21 Standard 5.24 31.45 27.79 Standard 5.56 33.35 1.90 6%
Hermitage Park Pavilion Community Room
(Commercial rate per hour Saturday and Sunday) 33.46 Standard 6.69 40.15 35.46 Standard 7.09 42.55 2.40 6%
PLAYING FIELDS
18 and over 90.50 Standard 18.10 108.60 95.92 Standard 19.18 115.10 6.50 6%
Under 18's 45.21 Standard 9.04 54.25 47.92 Standard 9.58 57.50 3.25 6%
18 and over 45.21 Standard 9.04 54.25 47.92 Standard 9.58 57.50 3.25 6%
Under 18's 22.63 Standard 4.53 27.15 24.00 Standard 4.80 28.80 1.65 6%
Hire of Pitch for Training (2 hours) All ages 22.63 Standard 4.53 27.15 24.00 Standard 4.80 28.80 1.65 6%
18 and over 27.42 Standard 5.48 32.90 29.04 Standard 5.81 34.85 1.95 6%
Under 18's 13.75 Standard 2.75 16.50 14.58 Standard 2.92 17.50 1.00 6%
Hire of Pony Park - Bute Concession 46.08 Standard 9.22 55.30 48.83 Standard 9.77 58.60 3.30 6%
Hire of Howie Pavilion, Lomond 12.10 Exempt 0.00 12.10 12.85 Exempt 0.00 12.85 0.75 6%
OUTDOOR RECREATION
Adult 3.33 Standard 0.67 4.00 3.54 Standard 0.71 4.25 0.25 6%
Concession 1.71 Standard 0.34 2.05 1.79 Standard 0.36 2.15 0.10 5%
Adult 3.33 Standard 0.67 4.00 3.54 Standard 0.71 4.25 0.25 6%
Concession 1.71 Standard 0.34 2.05 1.79 Standard 0.36 2.15 0.10 5%
Adult 62.50 Standard 12.50 75.00 66.25 Standard 13.25 79.50 4.50 6%
Concession 30.75 Standard 6.15 36.90 32.58 Standard 6.52 39.10 2.20 6%
Adult 3.33 Standard 0.67 4.00 3.54 Standard 0.71 4.25 0.25 6%
Concession 1.71 Standard 0.34 2.05 1.79 Standard 0.36 2.15 0.10 5%
Adult 3.33 Standard 0.67 4.00 3.54 Standard 0.71 4.25 0.25 6%
Concession 1.71 Standard 0.34 2.05 1.79 Standard 0.36 2.15 0.10 5%
Adult 75.33 Standard 15.07 90.40 79.83 Standard 15.97 95.80 5.40 6%
Concession 37.79 Standard 7.56 45.35 40.04 Standard 8.01 48.05 2.70 6%
Cricket Wicket (unprepared) Adult 41.67 Standard 8.33 50.00 44.17 Standard 8.83 53.00 3.00 6%
Cricket Wicket (prepared) Adult 75.33 Standard 15.07 90.40 79.83 Standard 15.97 95.80 5.40 6%
Hire of McCaigs Tower (Weddings) 376.92 Standard 75.38 452.30 399.54 Standard 79.91 479.45 27.15 6%
Hire of Stadium (Mossfield, Dunoon and Rothesay) for a
major event - MINIMUM CHARGE 904.29 Standard 180.86 1,085.15 958.54 Standard 191.71 1,150.25 65.10 6%
Dunoon Stadium - Hire of running Track-without marking 15.13 Standard 3.03 18.15 16.04 Standard 3.21 19.25 1.10 6%
Dunoon Stadium - Hire of Running Track-with marking 67.83 Standard 13.57 81.40 71.92 Standard 14.38 86.30 4.90 6%
Grass Tracks - Hire of Running Track (without marking) 15.13 Standard 3.03 18.15 16.04 Standard 3.21 19.25 1.10 6%
Grass Tracks - Hire of Running Track (with marking) 204.96 Standard 40.99 245.95 217.25 Standard 43.45 260.70 14.75 6%
Grandstand (Public Restricted) 287.92 Standard 57.58 345.50 305.21 Standard 61.04 366.25 20.75 6%
Rental of Stall - Per Linear Metre 75.71 Standard 15.14 90.85 80.25 Standard 16.05 96.30 5.45 6%
Rental of Stall - by Registered Charity - by Stall 36.21 Standard 7.24 43.45 38.38 Standard 7.68 46.05 2.60 6%
Hire of lined Pitch with Changing Facilities including attendant
required for changing facilities (2.5 hours)
All hire must be paid for in advance.
Block Bookings (10 consecutive bookings)
booked in advance is VAT exempt.
Minimum of 48 hours notice is required if the
pitch requires to be lined.
48 hours notice of cancellation required in
order to be reimbursed.
Hire of Howie Pavilion - standard VAT
should be applied if Council staff are
involved in setting up the hall.
A 25% reduction on cost will be offered to
groups making block bookings. A block
booking is defined as 5 or more bookings
within any 3 month period.
Tennis - Hire of Racquet and Balls
Bowling - Per Session
Bowling - Season Ticket
Tennis - Per Session
Tennis - Season Ticket
Putting and Crazy Golf
Hire of lined Pitch only (2.5 hours)
Hire of Pitch for Training with changing facilities (2 hours)
The stadium fee is the daily rate applied and
is for use of the stadium hire only, including
the spectator area/pavilion and toilet block. 
Any other service requirements are outwith
this charge, and will be charged separately.
Page 23 Amenities
Page 125

Page 126

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2025-26 Increase2026-27
FAIRS
Charges for commercial refuse/tidy up
will be over and above the charges
noted.
Hire of ground for 1 week (7 days) With total frontage of all
rides/stalls, less than 49 linear metres 460.55 Exempt 0.00 460.55 488.20 Exempt 0.00 488.20 27.65 6%
Hire of Ground for 1 week (7 days). With total frontage of all
rides/stalls, over 49 linear metres - per linear metre 9.50 Exempt 0.00 9.50 10.05 Exempt 0.00 10.05 0.55 6%
Food Vans/Stalls - Hire of Ground per week (7days) - per
linear metre 7.05 Exempt 0.00 7.05 7.45 Exempt 0.00 7.45 0.40 6%
Charitable Organisations - Hire of Ground up to 7 days - per
linear metre 4.75 Exempt 0.00 4.75 5.05 Exempt 0.00 5.05 0.30 6%
FLORAL DECORATIONS
Hire of Round or Half Baskets (each) 23.21 Standard 4.64 27.85 24.58 Standard 4.92 29.50 1.65 6%
Troughs 1 Metre Long (each) 28.17 Standard 5.63 33.80 29.88 Standard 5.98 35.85 2.05 6%
Tubs to 16" diameter (each) 33.25 Standard 6.65 39.90 35.25 Standard 7.05 42.30 2.40 6%
Tubs over 16" diameter (each) 48.17 Standard 9.63 57.80 51.04 Standard 10.21 61.25 3.45 6%
Handling Charge
BURIAL CHARGES
*Interment/Re Opening Lair 1,052.00 Outwith the Scope 0.00 1,052.00 1,210.00
Outwith the
Scope 0.00 1,210.00 158.00 15%
Interment (Child under 18)
Additional Charge - Interment on Saturday/Sunday or Public
Holiday will incur this additional charge 392.00 Outwith the Scope 0.00 392.00 451.00
Outwith the
Scope 0.00 451.00 59.00 15%
Additional Charge - Burial of ashes on Saturday/Sunday or
Public Holiday will incur this additional charge 112.00 Outwith the Scope 0.00 112.00 129.00
Outwith the
Scope 0.00 129.00 17.00 15%
*Burial of cremated remains at minimum depth
Deceased remains
being interred at 3
feet as per current
procedures 237.00 Outwith the Scope 0.00 237.00 273.00
Outwith the
Scope 0.00 273.00 36.00 15%
*Burial of cremated remains at available depth
Deceased remains
being interred at a
greater depth per
new legislation 1,052.00 Outwith the Scope 0.00 1,052.00 1,210.00
Outwith the
Scope 0.00 1,210.00 158.00 15%
*Scattering of Ashes 182.00 Outwith the Scope 0.00 182.00 209.00
Outwith the
Scope 0.00 209.00 27.00 15%
Purchase of Lair - exclusive right of burial (Child under 18)
*Purchase of Burial Lair, incl maintenance 1,239.00 Exempt 0.00 1,239.00 1,425.00 Exempt 0.00 1,425.00 186.00 15%
*Lair for Casket only 255.00 Exempt 0.00 255.00 293.00 Exempt 0.00 293.00 38.00 15%
*Woodland and Green Burial Service Burial Charge 1,052.00 Outwith the Scope 0.00 1,052.00 1,210.00
Outwith the
Scope 0.00 1,210.00 158.00 15%
*Woodland and Green Burial Service Standard Lair 2,485.00 Exempt 0.00 2,485.00 2,858.00 Exempt 0.00 2,858.00 373.00 15%
Transfer of Title Deeds 68.00 Outwith the Scope 0.00 68.00 78.00
Outwith the
Scope 0.00 78.00 10.00 15%
Extract/Search Register (£13.20 to be paid in Advance for
work up to half an hour) 39.00 Outwith the Scope 0.00 39.00 45.00
Outwith the
Scope 0.00 45.00 6.00 15%
Administration Fee for Return of Lair
10% of purchase
price (90%
returned) Standard 0.00 Standard 0.00
Permission to erect Standard Memorial or one off design 205.00 Exempt 0.00 205.00 236.00 Exempt 0.00 236.00 31.00 15%
Permission to erect semi recumbent book type memorial 100.00 Exempt 0.00 100.00 115.00 Exempt 0.00 115.00 15.00 15%
Erection of plaques at Cemeteries (where consent granted) 100.00 Outwith the Scope 0.00 100.00 115.00
Outwith the
Scope 0.00 115.00 15.00 15%
No charge
No charge No charge
Loss or damage to containers will be
charged to hirer at replacement value.
* 100% to be added to interment/lair
charges (except for the transfer of title
deed) for non residents of Argyll & Bute with
the following exemptions:  
1. Clear proof that deceased lived
permanently in Argyll & Bute within 10 years
of death.   
2. If the deceased person has been in long
term residential care outwith the boundaries
of Argyll & Bute Council, but was previously
a resident of Argyll & Bute and was moved
to such residential care at the behest of this,
or a previous Local Authority.
3. Any resident or former resident of Argyll
& Bute who has died in the service of their
country.
4. Permission for erection of memorial to be
paid at same time as purchase of lair.
5. Burial Lair may include up to 3 standard
interments, dependant on depth of coffin.
6. Increase proposed as budget saving.
At cost price with prior notice
No charge
Page 24 Amenities
Page 126

Page 127

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2025-26 Increase2026-27
Erection of inscribed memorial plaque (for previously
unmarked graves) 341.00 Outwith the Scope 0.00 341.00 392.00
Outwith the
Scope 0.00 392.00 51.00 15%
Erection of Headstone (Tiree ONLY) 263.00 Outwith the Scope 0.00 263.00 302.00
Outwith the
Scope 0.00 302.00 39.00 15%
Exhumations (not including re interment) 1,126.00 Exempt 0.00 1,126.00 1,295.00 Exempt 0.00 1,295.00 169.00 15% Increase proposed as budget saving.
Exhumations of Caskets (hourly rate) 73.00 Exempt 0.00 73.00 84.00 Exempt 0.00 84.00 11.00 15% Increase proposed as budget saving.
CREMATORIUM CHARGES
Child (under 18)
Adults 18 years and over 1,034.00 Exempt 0.00 1,034.00 1,189.00 Exempt 0.00 1,189.00 155.00 15% Increase proposed as budget saving.
Adults 18 years and over - Saturday 1,142.00 Exempt 0.00 1,142.00 1,313.00 Exempt 0.00 1,313.00 171.00 15% Increase proposed as budget saving.
Additional Charge - Public Holiday 355.00 Exempt 0.00 355.00 408.00 Exempt 0.00 408.00 53.00 15% Increase proposed as budget saving.
Direct Cremations (no use of chapel) 721.00 Exempt 0.00 721.00 829.00 Exempt 0.00 829.00 108.00 15%
Direct Cremations (no use of chapel) - Saturday 794.00 Exempt 0.00 794.00 913.00 Exempt 0.00 913.00 119.00 15%
Direct Cremations (no use of chapel) -
Additional Charge Public Holiday 355.00 Exempt 0.00 355.00 408.00 Exempt 0.00 408.00 53.00 15%
Clergy 100.00 Standard 20.00 120.00 115.00 Standard 23.00 138.00 18.00 15% Increase proposed as budget saving.
Access to Undertake Live Streaming of Cremation Services 29.00 Exempt 0.00 29.00 33.00 Exempt 0.00 33.00 4.00 14% Increase proposed as budget saving.
Dispersal of Ashes 39.00 Exempt 0.00 39.00 45.00 Exempt 0.00 45.00 6.00 15%
Charge for Dispersal of Ashes for
Cremations held at Cardross Crematorium
now absorbed within the Cremation Fee. 
Where the Cremation is held elsewhere, but
the Ashes dispersed at Cardross, this fee
will continue. Increase proposed as budget
saving.
Casket - Purchase 71.67 Standard 14.33 86.00 82.50 Standard 16.50 99.00 13.00 15%
Increase proposed as budget saving.
Urn (plus carrier) - Purchase 32.50 Standard 6.50 39.00 37.50 Standard 7.50 45.00 6.00 15% Increase proposed as budget saving.
Book of Remembrance (per line) 45.00 Standard 9.00 54.00 51.67 Standard 10.33 62.00 8.00 15% Increase proposed as budget saving.
Small Book of Remembrance (2 Lines) 142.50 Standard 28.50 171.00 164.17 Standard 32.83 197.00 26.00 15% Increase proposed as budget saving.
Small Book of Remembrance (5 Lines) 265.00 Standard 53.00 318.00 305.00 Standard 61.00 366.00 48.00 15% Increase proposed as budget saving.
Small Book of Remembrance (8 Lines) 389.17 Standard 77.83 467.00 447.50 Standard 89.50 537.00 70.00 15% Increase proposed as budget saving.
Small Book of Remembrance (Gilded Motif) 95.00 Standard 19.00 114.00 109.17 Standard 21.83 131.00 17.00 15% Increase proposed as budget saving.
Badges 73.33 Standard 14.67 88.00 84.17 Standard 16.83 101.00 13.00 15% Increase proposed as budget saving.
Coat of Arms and Floral Motif 99.17 Standard 19.83 119.00 114.17 Standard 22.83 137.00 18.00 15% Increase proposed as budget saving.
Retention of Ashes - per month 17.00 Exempt 0.00 17.00 20.00 Exempt 0.00 20.00 3.00 18% Increase proposed as budget saving.
Chapel of Rest 54.17 Standard 10.83 65.00 62.50 Standard 12.50 75.00 10.00 15% Increase proposed as budget saving.
Plaque - Single with inscription (25 years) 248.33 Standard 49.67 298.00 285.83 Standard 57.17 343.00 45.00 15% Increase proposed as budget saving.
Plaque - Single continuation of lease (25 years) 150.00 Standard 30.00 180.00 172.50 Standard 34.50 207.00 27.00 15% Increase proposed as budget saving.
Plaque - Double with single inscriptions (25 years) 360.00 Standard 72.00 432.00 414.17 Standard 82.83 497.00 65.00 15% Increase proposed as budget saving.
Plaque - Double with two inscriptions (25 years) 457.50 Standard 91.50 549.00 525.83 Standard 105.17 631.00 82.00 15% Increase proposed as budget saving.
Plaque - Double continuation of lease (25 years) 299.17 Standard 59.83 359.00 344.17 Standard 68.83 413.00 54.00 15% Increase proposed as budget saving.
Additional inscription 135.00 Standard 27.00 162.00 155.00 Standard 31.00 186.00 24.00 15% Increase proposed as budget saving.
Use of Crematorium Chapel for a Burial Service 313.33 Standard 62.67 376.00 360.00 Standard 72.00 432.00 56.00 15% Increase proposed as budget saving.
Memorial Kerbstone - (10 years) 308.33 Standard 61.67 370.00 355.00 Standard 71.00 426.00 56.00 15% Increase proposed as budget saving.
Plaque with full inscription for Kerbstone - £600 Standard 525.83 Standard 105.17 631.00 0.00 0% New charge for 2026-27
Single Photo
Extra Photo 12.70 Standard 2.54 15.24 15.24 0% New charge for 2026-27
Basic Slide Show (up to 25 photos) without Music 47.53 Standard 9.51 57.04 57.04 0% New charge for 2026-27
Music Tribute (up to 25 photos) with Music 73.93 Standard 14.79 88.72 88.72 0% New charge for 2026-27
Themed Tribute 100.38 Standard 20.08 120.46 120.46 0% New charge for 2026-27
Bespoke Tribute 422.63 Standard 84.53 507.16 507.16 0% New charge for 2026-27
Tribute Download 10.59 Standard 2.12 12.71 12.71 0% New charge for 2026-27
Extra Tribute Photos 22.18 Standard 4.44 26.62 26.62 0% New charge for 2026-27
Extra Work Charge 22.18 Standard 4.44 26.62 26.62 0% New charge for 2026-27
Family Supplied Tribute 24.40 Standard 4.88 29.28 29.28 0% New charge for 2026-27
Late Fees for Music and Amendments for Works 21.08 Standard 4.22 25.30 25.30 0% New charge for 2026-27
Streaming Live on Demand (can be viewed for 28 days) 51.81 Exempt 0.00 51.81 51.81 0% New charge for 2026-27
Organist Fees 80.00 Standard 16.00 96.00 96.00 0% New charge for 2026-27
No Charge
No charge No charge
This complies with the Scottish
Governments funeral poverty guidance.
Increase proposed as budget saving.
* 100% to be added to interment/lair
charges (except for the transfer of title
deed) for non residents of Argyll & Bute with
the following exemptions:  
1. Clear proof that deceased lived
permanently in Argyll & Bute within 10 years
of death.   
2. If the deceased person has been in long
term residential care outwith the boundaries
of Argyll & Bute Council, but was previously
a resident of Argyll & Bute and was moved
to such residential care at the behest of this,
or a previous Local Authority.
3. Any resident or former resident of Argyll
& Bute who has died in the service of their
country.
4. Permission for erection of memorial to be
paid at same time as purchase of lair.
5. Burial Lair may include up to 3 standard
interments, dependant on depth of coffin.
6. Increase proposed as budget saving.
Page 25 Amenities
Page 127

Page 128

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
FERRY FARES
Ferry Fares held at 0% in 25-26 - now
being increased again
SPT Concessionary Travel Scheme  - Single
STATUTORY
CHARGE
SPT Concessionary Travel Scheme  - Return
STATUTORY
CHARGE
Out of hours Service - Cuan/Easdale/Lismore - up to Midnight
(excl. commercial vehicles) 86.30 Zero Rated 0.00 86.30 86.30 Zero Rated 0.00 91.50 5.20 6%
Out of hours Service - Cuan - Commercial Vehicles - up to
Midnight 71.92 Standard 14.38 86.30 71.92 Standard 15.25 91.50 5.20 6%
Out of hours Service - Cuan/Easdale/Lismore - After Midnight
(excl. commercial vehicles) 111.50 Zero Rated 0.00 111.50 111.50 Zero Rated 0.00 118.20 6.70 6%
Out of hours Service - Cuan - Commercial Vehicles - after
Midnight 92.92 Standard 18.58 111.50 92.92 Standard 19.70 118.20 6.70 6%
Easdale/Cuan Passenger Fares - Adult - Return 2.70 Zero Rated 0.00 2.70 2.70 Zero Rated 0.00 2.85 0.15 6%
Easdale/Cuan Passenger Fares - Adult – 5 Return Journeys 8.50 Zero Rated 0.00 8.50 8.50 Zero Rated 0.00 9.00 0.50 6%
Easdale/Cuan Passenger Fares - Child – Return 1.50 Zero Rated 0.00 1.50 1.50 Zero Rated 0.00 1.60 0.10 7%
Easdale/Cuan Passenger Fares - Child – 5 Return Journeys 4.10 Zero Rated 0.00 4.10 4.10 Zero Rated 0.00 4.35 0.25 6%
Easdale freight (domestic & commercial) - half boat load 12.33 Standard 2.47 14.80 12.33 Standard 2.62 15.70 0.90 6%
Easdale freight (domestic & commercial) - full boat load 23.83 Standard 4.77 28.60 23.83 Standard 5.05 30.30 1.70 6%
Cuan Vehicle Fares - Car including concession driver return -
must present SPT ferry travel card 11.80 Zero Rated 0.00 11.80 11.80 Zero Rated 0.00 12.50 0.70 6% Driver included in overall fare
Cuan Vehicle Fares - Car with blue badge holder (25%
discount) including concession driver return - must present
SPT ferry travel card 9.15 Zero Rated 0.00 9.15 9.15 Zero Rated 0.00 9.70 0.55 6%
Driver included in overall fare
Blue Badge Discount Now 25% Rather Than
50% To Align With Others (See Cal Mac).
Spt Discount For Travel Card Holder Too
Cuan Vehicle Fares - Car with blue badge holder (25%
discount) including driver return 10.40 Zero Rated 0.00 10.40 10.40 Zero Rated 0.00 11.00 0.60 6%
Driver included in overall fare
Blue Badge Discount Now 25% Rather Than
50% To Align With Others (See Cal Mac)
Cuan Vehicle Fares - Private Vehicles - cars, trailers or
caravans - Return - Up to and Including 5m (incl driver) 13.00 Zero Rated 0.00 13.00 13.00 Zero Rated 0.00 13.80 0.80 6%
Cuan Vehicle Fares - Private Vehicles - cars, trailers or
caravans - Up to and Including 5m - 5 Return Journeys (incl
driver) 42.40 Zero Rated 0.00 42.40 42.40 Zero Rated 0.00 44.95 2.55 6%
Cuan Vehicle Fares - Private Vehicles - cars, trailers or
caravans - Up to and including 5m – 3 Monthly Unlimited
(domestic travellers only - car and driver only) 297.10 Zero Rated 0.00 297.10 297.10 Zero Rated 0.00 314.95 17.85 6%
Cuan Vehicle Fares - Private Vehicles - Motorcycle - Return
(incl rider) 6.90 Zero Rated 0.00 6.90 6.90 Zero Rated 0.00 7.30 0.40 6%
Cuan Vehicle Fares - Private Vehicles - Motorcycle - 5 Return
Journeys (incl rider) 22.20 Zero Rated 0.00 22.20 22.20 Zero Rated 0.00 23.55 1.35 6%
Cuan Vehicle Fares - Commercial Vehicles/Coaches - 5.01m
to 8.0m - Return (incl driver) 20.42 Standard 4.08 24.50 20.42 Standard 4.33 25.95 1.45 6%
Cuan Vehicle Fares - Commercial Vehicles/Coaches - 8.01m
to 12.0m - Return (incl driver) 29.58 Standard 5.92 35.50 29.58 Standard 6.28 37.65 2.15 6%
Cuan Vehicle Fares - Commercial Vehicles/Coaches - 12.01m
to 18.0m - Return (incl driver) 57.92 Standard 11.58 69.50 57.92 Standard 12.28 73.65 4.15 6%
Cuan Vehicle Fares - Commercial Vehicles/Coaches - 5.01m
to 8.0m -  5 Return Journeys (incl driver) 95.50 Standard 19.10 114.60 95.50 Standard 20.25 121.50 6.90 6%
Cuan Vehicle Fares - Commercial Vehicles/Coaches - 8.01m
to 12.0m - 5 Return Journeys (incl driver) 140.83 Standard 28.17 169.00 140.83 Standard 29.86 179.15 10.15 6%
Cuan Vehicle Fares - Commercial Vehicles/Coaches - 12.01m
to 18.0m -5  Return Journeys (incl driver) 279.00 Standard 55.80 334.80 279.00 Standard 59.15 354.90 20.10 6%
Lismore Passenger Fares - Adult - Single 2.40 Zero Rated 0.00 2.40 2.40 Zero Rated 0.00 2.55 0.15 6%
Jura Passenger Fares - Adult - Single 2.40 Zero Rated 0.00 2.40 2.40 Zero Rated 0.00 2.55 0.15 6%
Lismore Passenger Fares - Adult - 10 Journeys 15.20 Zero Rated 0.00 15.20 15.20 Zero Rated 0.00 16.10 0.90 6%
Jura Passenger Fares - Adult - 10 Journeys 15.20 Zero Rated 0.00 15.20 15.20 Zero Rated 0.00 16.10 0.90 6%
Lismore Passenger Fares - Child - Single 1.40 Zero Rated 0.00 1.40 1.40 Zero Rated 0.00 1.50 0.10 7%
Jura Passenger Fares - Child - Single 1.40 Zero Rated 0.00 1.40 1.40 Zero Rated 0.00 1.50 0.10 7%
Lismore Passenger Fares - Child - 10 Journeys 7.30 Zero Rated 0.00 7.30 7.30 Zero Rated 0.00 7.75 0.45 6%
2025-26 2026-27 Increase
Statutory Charge Set by SPT
Age 5 to 16 - Child Fare
Age 16 and above - Adult Fare
Free Travel: Children up to Age 5, Scholars,
Primary School Escort,  Pre-5 Escort
Age 5 to 16 - Child Fare
Age 16 and above - Adult Fare
Free Travel: Children up to Age 5, Scholars,
Primary School Escort,  Pre-5 Escort
Page 26 Ferries, Piers & Harbours
Page 128

Page 129

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2025-26 2026-27 Increase
Jura Passenger Fares - Child - 10 Journeys 7.30 Zero Rated 0.00 7.30 7.30 Zero Rated 0.00 7.75 0.45 6%
Lismore Cycle charge 2.00 Zero Rated 0.00 2.00 2.00
Lismore E-Cycle charge 4.00 Zero Rated 0.00 4.00 4.00
Jura Vehicle Fares - Private Vehicles - Excursion Return (incl
driver) 23.20 Zero Rated 0.00 23.20 23.20 Zero Rated 0.00 24.60 1.40 6%
Jura Vehicle Fares - Private Vehicles -  Car including
concession driver return - must present SPT ferry travel
card 20.80 Zero Rated 0.00 20.80 20.80 Zero Rated 0.00 22.05 1.25 6% Driver included in overall fare
Jura Vehicle Fares - Private Vehicles -  Car with blue badge
holder (25% discount) including concession driver return -
must present SPT ferry travel card 16.20 Zero Rated 0.00 16.20 16.20 Zero Rated 0.00 17.15 0.95 6%
Driver included in overall fare
Blue Badge Discount Now 25% Rather Than
50% To Align With Others (See Cal Mac).
Spt Discount For Travel Card Holder Too
Jura Vehicle Fares - Private Vehicles -  Car with blue badge
holder (25% discount) including driver return 18.60 Zero Rated 0.00 18.60 18.60 Zero Rated 0.00 19.70 1.10 6%
Driver included in overall fare
Blue Badge Discount Now 25% Rather Than
50% To Align With Others (See Cal Mac)
Jura Vehicle Fares - all vehicles up to and including 6m -
single journey (incl driver) 11.40 Zero Rated 0.00 11.80 11.40 Zero Rated 0.00 12.50 0.70 6%
Jura Vehicle Fares - all vehicles up to and including 6m - 10
Single Journeys (incl driver) 74.10 Zero Rated 0.00 74.10 74.10 Zero Rated 0.00 78.55 4.45 6%
Jura Vehicle Fares - all vehicles up to and including 6m - 50
Single Journeys (incl driver) 0.00 Zero Rated 0.00 365.30 0.00 Zero Rated 0.00 387.20 21.90 6%
Jura Vehicle Fares - Private Vehicles - Motorcycle - Single
(incl rider) 7.00 Zero Rated 0.00 7.00 7.00 Zero Rated 0.00 7.40 0.40 6%
Jura Vehicle Fares - Private Vehicles - Motorcycle - 10
Journeys (incl rider) 44.90 Zero Rated 0.00 44.90 44.90 Zero Rated 0.00 47.60 2.70 6%
Jura Vehicle Fares - Private Vehicles - Motorhomes - 6.01m
to 8.0m - Return (incl driver) 54.40 Zero Rated 0.00 54.40 54.40 Zero Rated 0.00 57.65 3.25 6%
Jura Vehicle Fares - Private Vehicles - Motorhomes - 8.01m
to 12.0m - Return (incl driver) 76.00 Zero Rated 0.00 76.00 76.00 Zero Rated 0.00 80.55 4.55 6%
Jura Vehicle Fares - Commercial Vehicles/Coaches - 6.01m
to 8.0m Return (incl driver) 45.33 Standard 9.07 54.40 45.33 Standard 9.61 57.65 3.25 6%
Jura Vehicle Fares - Commercial Vehicles/Coaches - 8.01m
to 12.0m Return (incl driver) 63.33 Standard 12.67 76.00 63.33 Standard 13.43 80.55 4.55 6%
Jura Vehicle Fares - Commercial Vehicles/Coaches - 12.01m
to 18.0m Return (incl driver) 125.00 Standard 25.00 150.00 125.00 Standard 26.50 159.00 9.00 6%
Jura Vehicle Fares - Commercial Vehicles carrying
Dangerous Goods return (incl driver) 125.00 Standard 25.00 150.00 125.00 Standard 26.50 159.00 9.00 6%
Jura Vehicle Fares - Commercial Vehicles/Coaches - Out of
Hours service - up to Midnight 87.67 Standard 17.53 105.20 87.67 Standard 18.58 111.50 6.30 6%
Recommend out of hours service is £125
plus VAT
PIERS AND HARBOURS  - RATES - GOODS,
PASSENGERS & VEHICLES
Rates for Goods Shipped, Transhipped or
Unshipped at the Pier or Ferry Slip or
within the Harbour
General Goods Packaged (per tonne )Includes Fruit,
Beverages, Meat, Dairy Products, General Groceries and
Confectionery, Cured Fish, etc. 3.20 Zero Rated 0.00 3.20 3.45 Zero Rated 0.00 3.45 0.25 8%
Dry Bulk Commodities (per tonne) Ores, Aggregates and
Crushed Stone, Cement and Building Materials, Timber
(including Logs), Salt, etc. 2.85 Zero Rated 0.00 2.85 3.10 Zero Rated 0.00 3.10 0.25 9%
Liquid and Gaseous Bulk Products (per tonne) 3.55 Zero Rated 0.00 3.55 3.85 Zero Rated 0.00 3.85 0.30 8%
Explosives (per tonne) 126.00 Zero Rated 0.00 126.00 136.10 Zero Rated 0.00 136.10 10.10 8%
Livestock  - Poultry (per bird) 0.55 Zero Rated 0.00 0.55 0.60 Zero Rated 0.00 0.60 0.05 9%
Animals (per Animal) 1.05 Zero Rated 0.00 1.05 1.15 Zero Rated 0.00 1.15 0.10 10%
Smolt (per thousand) 7.20 Zero Rated 0.00 7.20 7.80 Zero Rated 0.00 7.80 0.60 8%
Fish, including Shellfish  - Fresh, all varieties and also fish
consigned for sale at other markets - percentage of catch 2.50% If Applicable 0.00 0.00 If Applicable 0.00 0.00
2.50% of catch
In determining weights for the purpose of
charging dues, the weights of the containers
of any goods shall be included.
In terms of liquid, gaseous bulk products,
bulk shipments of materials may be charged
at discounted rates subject to a request
being made in writing to the Executive
Director, Development and Infrastructure,
who will then refer the letter to the full
Council.
All empty boxes, barrels, sacks and
packages if previously shipped or landed
will be exempt.                                                      
Passengers Personal Baggage shall be free
of charge.
Page 27 Ferries, Piers & Harbours
Page 129

Page 130

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2025-26 2026-27 Increase
Rates on Passenger and Vehicles - Adult Passengers landing
at or embarking from pier (each) 0.65 Zero Rated 0.00 0.65 0.70 Zero Rated 0.00 0.70 0.05 8%
Rates on Passenger and Vehicles - Child Passengers landing
at or embarking from pier (each) 0.40 Zero Rated 0.00 0.40 0.45 Zero Rated 0.00 0.45 0.05 13%
Rates on Passenger and Vehicles - Private Cars, Taxis,
Hearses and Agricultural Machinery (Tractors, Trailers, etc.)
(each) 2.05 Zero Rated 0.00 2.05 2.20 Zero Rated 0.00 2.20 0.15 7%
Rates on Passenger and Vehicles - Caravans or Trailers
(except Commercial Trailers) (each) 3.25 Zero Rated 0.00 3.25 3.50 Zero Rated 0.00 3.50 0.25 8%
Rates on Passenger and Vehicles - Cycles (each) 0.55 Zero Rated 0.00 0.55 0.60 Zero Rated 0.00 0.60 0.05 9%
Rates on Passenger and Vehicles - Motorcycles including
sidecar (each) 1.35 Zero Rated 0.00 1.35 1.45 Zero Rated 0.00 1.45 0.10 7%
Rates on Passenger and Vehicles - Buses (each) 11.25 Zero Rated 0.00 11.25 12.15 Zero Rated 0.00 12.15 0.90 8%
Rates on Passenger and Vehicles - Commercial Vehicles -
Per Metre 1.35 Zero Rated 0.00 1.35 1.45 Zero Rated 0.00 1.45 0.10 7%
PIERS AND HARBOURS  - RATES - MISCELLANEOUS
Mobile Cranage - for each lift 18.05 Zero Rated 0.00 18.05 19.50 Zero Rated 0.00 19.50 1.45 8%
Fresh Water - per tonne or part thereof (minimum charge £10) 5.15 Zero Rated 0.00 5.15 5.55 Zero Rated 0.00 5.55 0.40 8%
Left Luggage - per article up to 24hours (minimum charge
£10) 4.46 Standard 0.89 5.35 4.83 Standard 0.97 5.80 0.45 8%
Parcels and Packages up to 50 kg (minimum charge £10) 0.46 Standard 0.09 0.55 0.50 Standard 0.10 0.60 0.05 9%
Parcels and Packages- where articles can be measured -
charge per cubic metre (minimum charge £10) 5.00 Standard 1.00 6.00 5.42 Standard 1.08 6.50 0.50 8%
Parcels and Packages- where articles cannot be measured -
charge per tonne (minimum charge £10) 5.00 Standard 1.00 6.00 5.42 Standard 1.08 6.50 0.50 8%
Rope Handling - To be charged each time i.e. Arrival and
departure to be charged separately (NB to be charged to
ferries where additional resources are required) 202.50 Zero Rated 0.00 202.50 218.70 Zero Rated 0.00 218.70 16.20 8%
Rope Handling at Campbeltown Harbour for Commercial
Vessels - Out of Hours on non-public holidays.- To be
charged each time i.e. Arrival and departure to be charged
separately. 218.70 Zero Rated 0.00 218.70 218.70 0%
New charge proposed as a budget saving.
Rope Handling at Campbeltown Harbour for Commercial
Vessels - Out of Hours on public holidays.- To be charged
each time i.e. Arrival and departure to be charged separately. 434.70 Zero Rated 0.00 434.70 434.70 0%
New charge proposed as a budget saving.
Timber Debris Clearance 506.38 Standard 101.28 607.65 546.88 Standard 109.38 656.25 48.60 8%
Cost of clearing site reflected in increase in
charge.
Use of Linkspan - Commercial use 485.55 Zero Rated 0.00 485.55 524.40 Zero Rated 0.00 524.40 38.85 8%
Use of Linkspan - non-vehicular traffic 56.60 Zero Rated 0.00 56.60 61.15 Zero Rated 0.00 61.15 4.55 8%
Operational Duties on behalf of external bodies     0.00
Car and Pedestrian marshalling - Rothesay and Dunoon (per
day) 164.46 Standard 32.89 197.35 177.63 Standard 35.53 213.15 15.80 8%
Freight handling - Rothesay Harbour 16.17 Standard 3.23 19.40 17.46 Standard 3.49 20.95 1.55 8%
Electricity (per unit) 0.25 Standard 0.05 0.30 0.25 Standard 0.05 0.30 0.00 0%
Slipway Landing fee 8.05 Zero Rated 0.00 8.05 8.70 Zero Rated 0.00 8.70 0.65 8%
Cruise calls/tenders 809.15 Zero Rated 0.00 809.15 873.90 Zero Rated 0.00 873.90 64.75 8%
Oban Transit Marina 0.00
Daily Rate (Between 11:00 and 16:00) 13.42 Standard 2.68 16.10 14.50 Standard 2.90 17.40 1.30 8%
Overnight Charge (per metre length) 3.38 Standard 0.68 4.05 3.63 Standard 0.73 4.35 0.30 7% Maximum of 3 nights stay
Oban Harbour Conservancy Charges 0.00
Vessels with a GRT over 50 registered tonnage (per tonne) 0.07 Zero Rated 0.00 0.07 0.10 Zero Rated 0.00 0.10 0.03 43% charge per tonnage
Calmac Vessels (per tonne) 0.02 Zero Rated 0.00 0.02 0.02 Zero Rated 0.00 0.02 0.00 0% charge per tonnage
PIERS AND HARBOURS  - RATES - VESSELS
1 - Basic Rate  - all vessels to be charged at this rate
unless eligible for categories 2, 3, 4 - see comment 2
Up to 5 metres in length
Per visit up to 24
hours 16.20 Zero Rated 0.00 16.20 17.50 Zero Rated 0.00 17.50 1.30 8%
Up to 6 metres in length
Per visit up to 24
hours 19.60 Zero Rated 0.00 19.60 21.15 Zero Rated 0.00 21.15 1.55 8%
Up to 7 metres in length
Per visit up to 24
hours 22.50 Zero Rated 0.00 22.50 24.30 Zero Rated 0.00 24.30 1.80 8%
Up to 8 metres in length
Per visit up to 24
hours 26.00 Zero Rated 0.00 26.00 28.10 Zero Rated 0.00 28.10 2.10 8%
COMMENTS
1. The category and rate under which a
vessel is to be charged must be paid at the
time of the berthing or on invoicing as
appropriate.
2.  All vessels are liable for dues at the
Basic Rate. Only those, which are actively
engaged in the relevant activity, are eligible
for Category 2,3 or 4.
3. All vessels actively engaged in
commercial undertaking, these would be
subject to minimum payment by length as
for unregistered vessels.
4. Rothesay and Campbeltown Pontoon are
not managed by Argyll and Bute and are
subject to their own charges.
5. The above rates and dues include for
Port Waste Facilities to the level required by
local and leisure craft. Any requirements for
additional waste facilities or specialised
waste disposal, in terms of the Merchant
Shipping & Fishing Vessels (Port Waste
Reception Facilities) Regulations 2003,
must be made to the Service Director at
least 24 hours in advance. This cost shall
be paid prior to the provision of the service.
6. Concession rates for unlimited use will be
available only for vessels “regularly sailing”.
Additional dues will be required for vessels,
which have made payment for unlimited use
but are not “regularly sailing”. A vessel will
be deemed to be “regularly sailing” if it
leaves the installation for a continuous
period of not less than 6 hours between
0600 hours and 2000 hours in any one day
for more than 14 days.
7. Periods are:
Summer period April to September
inclusive, or part thereof.
Winter period October to March inclusive, or
part thereof.
8. All concession rates for unlimited use
must be paid for in advance of the period for
which they cover. Failure to do so will result
in full rates being applied.
9. Commercial rates at Campeltown
Harbour (non-ferry) determined against
market rates as a comparitor against similar
ports and recharged to shipping companies,
as is standard practice in the global
shipping market.
10. VAT Zero Rating only applies where
the vessels are "qualifying ships".  A
"qualifying ship" is legally defined as any
ship of a gross tonnage of not less than
15 tonnes and neither designed nor
adapted for use for recreation or
pleasure.  The customer is a business
customer who belongs outside the UK (it
does not matter what size the vessel is).  
For goods remaining in sheds or on the pier
or quays for a period longer than 24 hours,
50% of the original pier dues shall be
charged for each 24 hours or part thereof.
Provided that in the case of sheds occupied
from time to time under lease or let from the
Council such dues shall not be charged
against the occupier or leasee.   The terms
of such leases or lets shall be subject to
individual negotiation with the Executive
Director.
(Note there is a minimum charge of £10.00
for some items)
Page 28 Ferries, Piers & Harbours
Page 130

Page 131

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2025-26 2026-27 Increase
Up to 9 metres in length
Per visit up to 24
hours 29.10 Zero Rated 0.00 29.10 31.45 Zero Rated 0.00 31.45 2.35 8%
Up to 10 metres in length
Per visit up to 24
hours 32.45 Zero Rated 0.00 32.45 35.05 Zero Rated 0.00 35.05 2.60 8%
Over 10 metres in length - charge per metre
Per visit up to 24
hours 3.20 Zero Rated 0.00 3.20 3.45 Zero Rated 0.00 3.45 0.25 8%
Up to 5 metres in length Weekly 80.65 Zero Rated 0.00 80.65 87.10 Zero Rated 0.00 87.10 6.45 8%
Up to 6 metres in length Weekly 96.75 Zero Rated 0.00 96.75 104.50 Zero Rated 0.00 104.50 7.75 8%
Up to 7 metres in length Weekly 112.80 Zero Rated 0.00 112.80 121.80 Zero Rated 0.00 121.80 9.00 8%
Up to 8 metres in length Weekly 131.10 Zero Rated 0.00 131.10 141.60 Zero Rated 0.00 141.60 10.50 8%
Up to 9 metres in length Weekly 146.30 Zero Rated 0.00 146.30 158.00 Zero Rated 0.00 158.00 11.70 8%
Up to 10 metres in length Weekly 161.25 Zero Rated 0.00 161.25 174.15 Zero Rated 0.00 174.15 12.90 8%
Up to 5 metres in length Summer 591.50 Zero Rated 0.00 591.50 638.80 Zero Rated 0.00 638.80 47.30 8%
Up to 6 metres in length Summer 709.65 Zero Rated 0.00 709.65 766.40 Zero Rated 0.00 766.40 56.75 8%
Up to 7 metres in length Summer 827.95 Zero Rated 0.00 827.95 894.20 Zero Rated 0.00 894.20 66.25 8%
Up to 8 metres in length Summer 946.20 Zero Rated 0.00 946.20 1,021.90 Zero Rated 0.00 1,021.90 75.70 8%
Up to 9 metres in length Summer 1,064.50 Zero Rated 0.00 1,064.50 1,149.65 Zero Rated 0.00 1,149.65 85.15 8%
Up to 10 metres in length Summer 1,182.90 Zero Rated 0.00 1,182.90 1,277.55 Zero Rated 0.00 1,277.55 94.65 8%
Up to 5 metres in length Winter 430.15 Zero Rated 0.00 430.15 464.55 Zero Rated 0.00 464.55 34.40 8%
Up to 6 metres in length Winter 516.15 Zero Rated 0.00 516.15 557.45 Zero Rated 0.00 557.45 41.30 8%
Up to 7 metres in length Winter 602.35 Zero Rated 0.00 602.35 650.55 Zero Rated 0.00 650.55 48.20 8%
Up to 8 metres in length Winter 688.15 Zero Rated 0.00 688.15 743.20 Zero Rated 0.00 743.20 55.05 8%
Up to 9 metres in length Winter 774.20 Zero Rated 0.00 774.20 836.15 Zero Rated 0.00 836.15 61.95 8%
Up to 10 metres in length Winter 860.15 Zero Rated 0.00 860.15 928.95 Zero Rated 0.00 928.95 68.80 8%
1a - Any ship of a gross tonnage less than 15 tonnes or
used for recreation or pleasure -  charge is subject to 20%
VAT
Up to 5 metres in length
Per visit up to 24
hours 13.83 Standard 2.77 16.60 14.96 Standard 2.99 17.95 1.35 8%
Up to 6 metres in length
Per visit up to 24
hours 16.50 Standard 3.30 19.80 17.83 Standard 3.57 21.40 1.60 8%
Up to 7 metres in length
Per visit up to 24
hours 19.21 Standard 3.84 23.05 20.75 Standard 4.15 24.90 1.85 8%
Up to 8 metres in length
Per visit up to 24
hours 21.92 Standard 4.38 26.30 23.67 Standard 4.73 28.40 2.10 8%
Up to 9 metres in length
Per visit up to 24
hours 24.71 Standard 4.94 29.65 26.67 Standard 5.33 32.00 2.35 8%
Up to 10 metres in length
Per visit up to 24
hours 27.42 Standard 5.48 32.90 29.63 Standard 5.93 35.55 2.65 8%
Over 10 metres in length - charge per metre
Per visit up to 24
hours 2.76 Standard 0.55 3.31 2.96 Standard 0.59 3.55 0.24 7%
Up to 5 metres in length Weekly 68.63 Standard 13.73 82.35 74.13 Standard 14.83 88.95 6.60 8%
Up to 6 metres in length Weekly 82.17 Standard 16.43 98.60 88.75 Standard 17.75 106.50 7.90 8%
Up to 7 metres in length Weekly 95.92 Standard 19.18 115.10 103.58 Standard 20.72 124.30 9.20 8%
Up to 8 metres in length Weekly 111.54 Standard 22.31 133.85 120.46 Standard 24.09 144.55 10.70 8%
Up to 9 metres in length Weekly 124.29 Standard 24.86 149.15 134.25 Standard 26.85 161.10 11.95 8%
Up to 10 metres in length Weekly 137.08 Standard 27.42 164.50 148.04 Standard 29.61 177.65 13.15 8%
Up to 5 metres in length Summer 502.67 Standard 100.53 603.20 542.88 Standard 108.58 651.45 48.25 8%
Up to 6 metres in length Summer 603.21 Standard 120.64 723.85 651.46 Standard 130.29 781.75 57.90 8%
Up to 7 metres in length Summer 703.75 Standard 140.75 844.50 760.04 Standard 152.01 912.05 67.55 8%
Up to 8 metres in length Summer 804.25 Standard 160.85 965.10 868.58 Standard 173.72 1,042.30 77.20 8%
Up to 9 metres in length Summer 904.88 Standard 180.98 1,085.85 977.25 Standard 195.45 1,172.70 86.85 8%
Up to 10 metres in length Summer 1,005.42 Standard 201.08 1,206.50 1,085.83 Standard 217.17 1,303.00 96.50 8%
Up to 5 metres in length Winter 365.67 Standard 73.13 438.80 394.92 Standard 78.98 473.90 35.10 8%
Up to 6 metres in length Winter 438.67 Standard 87.73 526.40 473.75 Standard 94.75 568.50 42.10 8%
Up to 7 metres in length Winter 511.88 Standard 102.38 614.25 552.83 Standard 110.57 663.40 49.15 8%
Up to 8 metres in length Winter 584.92 Standard 116.98 701.90 631.71 Standard 126.34 758.05 56.15 8%
Up to 9 metres in length Winter 658.21 Standard 131.64 789.85 710.88 Standard 142.18 853.05 63.20 8%
Up to 10 metres in length Winter 731.33 Standard 146.27 877.60 789.83 Standard 157.97 947.80 70.20 8%
COMMENTS
1. The category and rate under which a
vessel is to be charged must be paid at the
time of the berthing or on invoicing as
appropriate.
2.  All vessels are liable for dues at the
Basic Rate. Only those, which are actively
engaged in the relevant activity, are eligible
for Category 2,3 or 4.
3. All vessels actively engaged in
commercial undertaking, these would be
subject to minimum payment by length as
for unregistered vessels.
4. Rothesay and Campbeltown Pontoon are
not managed by Argyll and Bute and are
subject to their own charges.
5. The above rates and dues include for
Port Waste Facilities to the level required by
local and leisure craft. Any requirements for
additional waste facilities or specialised
waste disposal, in terms of the Merchant
Shipping & Fishing Vessels (Port Waste
Reception Facilities) Regulations 2003,
must be made to the Service Director at
least 24 hours in advance. This cost shall
be paid prior to the provision of the service.
6. Concession rates for unlimited use will be
available only for vessels “regularly sailing”.
Additional dues will be required for vessels,
which have made payment for unlimited use
but are not “regularly sailing”. A vessel will
be deemed to be “regularly sailing” if it
leaves the installation for a continuous
period of not less than 6 hours between
0600 hours and 2000 hours in any one day
for more than 14 days.
7. Periods are:
Summer period April to September
inclusive, or part thereof.
Winter period October to March inclusive, or
part thereof.
8. All concession rates for unlimited use
must be paid for in advance of the period for
which they cover. Failure to do so will result
in full rates being applied.
9. Commercial rates at Campeltown
Harbour (non-ferry) determined against
market rates as a comparitor against similar
ports and recharged to shipping companies,
as is standard practice in the global
shipping market.
10. VAT Zero Rating only applies where
the vessels are "qualifying ships".  A
"qualifying ship" is legally defined as any
ship of a gross tonnage of not less than
15 tonnes and neither designed nor
adapted for use for recreation or
pleasure.  The customer is a business
customer who belongs outside the UK (it
does not matter what size the vessel is).  
Page 29 Ferries, Piers & Harbours
Page 131

Page 132

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2025-26 2026-27 Increase
2 - Vessels actively engaged in a commercial undertaking.
If registered:- per gross registered tonne (see comment 3) 0.58 Zero Rated 0.00 0.58 0.65 Zero Rated 0.00 0.65 0.07 12%
If not registered then:
Up to 5 metres in length
Per visit up to 24
hours 8.34 Zero Rated 0.00 8.34 9.00 Zero Rated 0.00 9.00 0.66 8%
Up to 10 metres in length
Per visit up to 24
hours 16.51 Zero Rated 0.00 16.51 17.85 Zero Rated 0.00 17.85 1.34 8%
Up to 15 metres in length
Per visit up to 24
hours 24.84 Zero Rated 0.00 24.84 26.85 Zero Rated 0.00 26.85 2.01 8%
Up to 20 metres in length
Per visit up to 24
hours 32.95 Zero Rated 0.00 32.95 35.60 Zero Rated 0.00 35.60 2.65 8%
Up to 25 metres in length
Per visit up to 24
hours 41.35 Zero Rated 0.00 41.35 44.65 Zero Rated 0.00 44.65 3.30 8%
Up to 30 metres in length
Per visit up to 24
hours 50.14 Zero Rated 0.00 50.14 54.15 Zero Rated 0.00 54.15 4.01 8%
Over 30 metres in length - charge per metre
Per visit up to 24
hours 1.81 Zero Rated 0.00 1.81 1.95 Zero Rated 0.00 1.95 0.14 8%
Up to 5 metres in length Weekly 40.57 Zero Rated 0.00 40.57 43.80 Zero Rated 0.00 43.80 3.23 8%
Up to 10 metres in length Weekly 81.44 Zero Rated 0.00 81.44 87.95 Zero Rated 0.00 87.95 6.51 8%
Up to 15 metres in length Weekly 121.79 Zero Rated 0.00 121.79 131.55 Zero Rated 0.00 131.55 9.76 8%
Up to 20 metres in length Weekly 163.46 Zero Rated 0.00 163.46 176.55 Zero Rated 0.00 176.55 13.09 8%
Up to 25 metres in length Weekly 204.27 Zero Rated 0.00 204.27 220.60 Zero Rated 0.00 220.60 16.33 8%
Up to 30 metres in length Weekly 245.21 Zero Rated 0.00 245.21 264.85 Zero Rated 0.00 264.85 19.64 8%
3 - All vessels operating a scheduled ferry or pleasure
service per gross registered tonne. 0.1595 Zero Rated 0.00 0.1595 0.1723 Zero Rated 0.00 0.1723 0.0128 8% Ferry Charges rounded to 4 decima`l places
Unmanned Pier 0.1595 Zero Rated 0.00 0.1595 0.1723 Zero Rated 0.00 0.1723 0.0128 8% Ferry Charges rounded to 4 decimal places
Laying up of ferry at a non ferry/commercial berth 0.50 Zero Rated 0.00 0.50 0.54 Zero Rated 0.00 0.54 0.04 8%
4 - Vessels regularly engaged in commercial fishing and
paying appropriate fish landing dues to Council:
Up to 10 metres in length
Per visit up to 24
hours 3.77 Zero Rated 0.00 3.77 4.05 Zero Rated 0.00 4.05 0.28 7%
Up to 15 metres in length
Per visit up to 24
hours 5.57 Zero Rated 0.00 5.57 6.00 Zero Rated 0.00 6.00 0.43 8%
Up to 20 metres in length
Per visit up to 24
hours 7.48 Zero Rated 0.00 7.48 8.10 Zero Rated 0.00 8.10 0.62 8%
Up to 25 metres in length
Per visit up to 24
hours 9.34 Zero Rated 0.00 9.34 10.10 Zero Rated 0.00 10.10 0.76 8%
Up to 30 metres in length
Per visit up to 24
hours 11.17 Zero Rated 0.00 11.17 12.05 Zero Rated 0.00 12.05 0.88 8%
Over 30 metres in length - charge per metre 0.58 Zero Rated 0.00 0.58 0.65 Zero Rated 0.00 0.65 0.07 12%
Up to 10 metres in length Weekly 19.10 Zero Rated 0.00 19.10 20.65 Zero Rated 0.00 20.65 1.55 8%
Up to 15 metres in length Weekly 28.78 Zero Rated 0.00 28.78 31.10 Zero Rated 0.00 31.10 2.32 8%
Up to 20 metres in length Weekly 38.29 Zero Rated 0.00 38.29 41.35 Zero Rated 0.00 41.35 3.06 8%
Up to 25 metres in length Weekly 47.97 Zero Rated 0.00 47.97 51.80 Zero Rated 0.00 51.80 3.83 8%
Up to 30 metres in length Weekly 57.17 Zero Rated 0.00 57.17 61.75 Zero Rated 0.00 61.75 4.58 8%
Up to 10 metres in length Annual charge 497.65 Zero Rated 0.00 497.65 537.45 Zero Rated 0.00 537.45 39.80 8%
Up to 15 metres in length Annual charge 746.55 Zero Rated 0.00 746.55 806.25 Zero Rated 0.00 806.25 59.70 8%
Up to 20 metres in length Annual charge 992.60 Zero Rated 0.00 992.60 1,072.00 Zero Rated 0.00 1,072.00 79.40 8%
Up to 25 metres in length Annual charge 1,247.05 Zero Rated 0.00 1,247.05 1,346.80 Zero Rated 0.00 1,346.80 99.75 8%
Up to 30 metres in length Annual charge 1,487.35 Zero Rated 0.00 1,487.35 1,606.35 Zero Rated 0.00 1,606.35 119.00 8%
COMMENTS
1. The category and rate under which a
vessel is to be charged must be paid at the
time of the berthing or on invoicing as
appropriate.
2.  All vessels are liable for dues at the
Basic Rate. Only those, which are actively
engaged in the relevant activity, are eligible
for Category 2,3 or 4.
3. All vessels actively engaged in
commercial undertaking, these would be
subject to minimum payment by length as
for unregistered vessels.
4. Rothesay and Campbeltown Pontoon are
not managed by Argyll and Bute and are
subject to their own charges.
5. The above rates and dues include for
Port Waste Facilities to the level required by
local and leisure craft. Any requirements for
additional waste facilities or specialised
waste disposal, in terms of the Merchant
Shipping & Fishing Vessels (Port Waste
Reception Facilities) Regulations 2003,
must be made to the Service Director at
least 24 hours in advance. This cost shall
be paid prior to the provision of the service.
6. Concession rates for unlimited use will be
available only for vessels “regularly sailing”.
Additional dues will be required for vessels,
which have made payment for unlimited use
but are not “regularly sailing”. A vessel will
be deemed to be “regularly sailing” if it
leaves the installation for a continuous
period of not less than 6 hours between
0600 hours and 2000 hours in any one day
for more than 14 days.
7. Periods are:
Summer period April to September
inclusive, or part thereof.
Winter period October to March inclusive, or
part thereof.
8. All concession rates for unlimited use
must be paid for in advance of the period for
which they cover. Failure to do so will result
in full rates being applied.
9. Commercial rates at Campeltown
Harbour (non-ferry) determined against
market rates as a comparitor against similar
ports and recharged to shipping companies,
as is standard practice in the global
shipping market.
10. VAT Zero Rating only applies where
the vessels are "qualifying ships".  A
"qualifying ship" is legally defined as any
ship of a gross tonnage of not less than
15 tonnes and neither designed nor
adapted for use for recreation or
pleasure.  The customer is a business
customer who belongs outside the UK (it
does not matter what size the vessel is).  
In relation to the foregoing charges,  the relevant Executive Director, where they consider it to be in the commercial interests of the Council and after consultation with the relevant Policy Lead and the Head of Financial Services, is authorised to negotiate and
agree variations of the foregoing charges for individual users or classes of users of the facilities in respect of their respective use of the facilities and the charges as varied shall be applied to such use as the Executive Director  shall deem appropriate. In addition,
the Executive Director is authorised, after consultation with the relevant Policy Lead and the Head of Financial Services, to put in place a suitable booking procedures for harbour and airport facilities and to take into account, inter alia, the level of bookings made
by individual users or classes of users when agreeing variations of the foregoing charges with individual users or classes of users.
Page 30 Ferries, Piers & Harbours
Page 132

Page 133

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
AIRFIELD CHARGES
Standard Landing Charges - Applicable
to all types of operation (including
"Touch and Go" and circuits) MTWA =
Maximum Take-Off Weight Authorised
Standard Landing Charges - up to 500kg MTWA 12.92 Standard 2.58 15.50 13.75 Standard 2.75 16.50 1.00 6% Charge for ultra lights and flexwings.
Standard Landing Charges  - 501kg to  1000kg MTWA 17.08 Standard 3.42 20.50 17.92 Standard 3.58 21.50 1.00 5%
Standard Landing Charges  - 1001kg to 1500kg MTWA 25.83 Standard 5.17 31.00 27.50 Standard 5.50 33.00 2.00 6%
Standard Landing Charges  - 1501kg to 2000kg MTWA 32.50 Standard 6.50 39.00 34.17 Standard 6.83 41.00 2.00 5%
Standard Landing Charges  - 2001kg to 2500kg MTWA 38.33 Standard 7.67 46.00 40.83 Standard 8.17 49.00 3.00 7%
Standard Landing Charges  - 2501kg to 3000kg MTWA 50.83 Standard 10.17 61.00 54.17 Standard 10.83 65.00 4.00 7%
Standard Landing Charges  - 3001kg to 3500kg MTWA 70.83 Standard 14.17 85.00 75.00 Standard 15.00 90.00 5.00 6%
Standard Landing Charges  - 3501kg to 4000kg MTWA 83.33 Standard 16.67 100.00 88.33 Standard 17.67 106.00 6.00 6%
Standard Landing Charges  - 4001kg to 4500kg MTWA 100.83 Standard 20.17 121.00 106.67 Standard 21.33 128.00 7.00 6%
Standard Landing Charges  - 4501kg to 5000kg MTWA 115.83 Standard 23.17 139.00 122.50 Standard 24.50 147.00 8.00 6%
Standard Landing Charges  - Over 5000kg MTWA - per
additional 500g or part thereof 17.08 Standard 3.42 20.50 17.92 Standard 3.58 21.50 1.00 5%
Standard Landing Fee for Coll and Colonsay 8.92 Standard 1.78 10.70 9.42 Standard 1.88 11.30 0.60 6%
2025-26 2026-27 Increase
Landing Charge Rebates - Only Available if
full payment is made prior to final departure
or approved credit facilities have been
agreed.
A) Visiting Aircraft on Training Flights First
landing - full rate, Subsequent landings -
50% discount (only applies to aircraft
operating within 15nm after 1st landing).
B) Safety-related Diversionary Landing
(AOPA Scheme). The Council is prepared to
consider requests for waiver of charges from
a General Aviation (GA) pilot who makes a
general safety-related diversionary landing.
This waiver only applies to domestic GA
traffic. Assessment of the waiver will be
carried out by the senior Airport Officer on
duty. The council reserves the right to opt
out of the AOPA scheme at any time subject
to three month's notice being given to AOPA
by the council. Eligibility for waiver will be
based on the same criteria as for a light
aircraft landing fee. i.e. private flight in
accordance with Schedule 1 of the ANO
2016.
Flying Clubs, The council may negotiate
agreements for reduced landing charges for
flights made for the purpose of the clubs at
an airport but not flights made for hire or
reward outside the normal range or scope of
club activities.  These charges will increase
on an annual basis - as a minimum - by the
agreed Council Inflation Rate.
Page 31 Airfields
Page 133

Page 134

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2025-26 2026-27 Increase
Flights outside normal hours of availability - Oban 517.50 Standard 103.50 621.00 548.33 Standard 109.67 658.00 37.00 6%
Flights outside normal hours of availability - Coll and
Colonsay 260.00 Standard 52.00 312.00 275.83 Standard 55.17 331.00 19.00 6%
Flights outside normal hours of availability - Indemnity
Certificate 48.33 Standard 9.67 58.00 50.83 Standard 10.17 61.00 3.00 5%
Aircraft Parking charges (for a period of 24 hours or part
thereof) -          First 24 hours NO CHARGE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0%
No charge.
Aircraft Parking charges (for a period of 24 hours or part
thereof) Thereafter - Not exceeding 5 tonnes MTWA - charge
is per 500kg or part thereof 3.33 Standard 0.67 4.00 3.50 Standard 0.70 4.20 0.20 5%
Aircraft Parking charges (for a period of 24 hours or part
thereof) Thereafter - over 5 tonnes MTWA - charge is per
500kg or part thereof 5.75 Standard 1.15 6.90 6.08 Standard 1.22 7.30 0.40 6%
Aircraft Parking charges  - Refusal of Instruction to
move/Remove for 25-26 parked aircraft - Charge per day (plus
the standard aircraft parking charge noted above) 60.00 Standard 12.00 72.00 63.33 Standard 12.67 76.00 4.00 6%
The Council may at any time order an
aircraft operator either to move a parked
aircraft to another position or Remove for 25-
26 it from the airport. Failure to comply with
the order within the period specified in it will
render the operator liable to this charge.
Damage to Airport Property - Where an airport user damages
airport property (for which the avoidance of doubt includes, but
is not limited to, the runway, buildings, security barriers and
fences) the Council shall have the right to recharge the user for
any and all reasonable costs incurred by the Council. This
includes, but is not limited to make good materials, vehicles,
manpower, equipment etc., deemed necessary to make good
the damage. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0%
Holiday Voucher - Aircraft operators who are using Oban as a
base for their holiday can apply for a Holiday Voucher which
includes temporary indemnity for up to 2 weeks.  This is only
available for aircraft up to 2,730kg.  Aircraft operators must
present a valid copy of insurance prior to issue of the voucher. -
one week stay 7.75 Standard 1.55 9.30 8.25 Standard 1.65 9.90 0.60 6%
The application process is the same as for a
normal indemnity certificate/permit.  The cost
is £8.80 for one week.  Voucher is non-
transferable.
Weekly Parking Permit - applications may be
made to the Station Manager for the
purchase of these at a discounted rate (20%
reduction).  Arrangement and payment must
be made in advance of the aircraft parking
fee arrangement period.
Flights outside normal hours of availability as
described in the UK AIP and on the airport
website whereby the type of flight requires a
Licensed Aerodrome. Where flights are
made outside of these hours by arrangement
with the Council, an out of hours charge will
be payable in accordance with these rates or
such rates as agreed with the Council at the
time of the arrangement. The rates notes are
subject to a minimum charge equivalent to 2
hours. Note: an extension of up to one hour
immediately following normal opening hours
would incur a charge at 50% of the normal
hourly rate i.e. £293. 48hr notice minimum
for out of hours availability. 50% of the fees
applied to a request for out of hours will be
taken at the time the booking (at least 48hrs
notification). This will be refunded if
cancelled before the airports normal closing
time on the day of the planned visit. Coll and
Colonsay - helicopter fire cover only.
Page 32 Airfields
Page 134

Page 135

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2025-26 2026-27 Increase
Holiday Voucher - Aircraft operators who are using Oban as a
base for their holiday can apply for a Holiday Voucher which
includes temporary indemnity for up to 2 weeks.  This is only
available for aircraft up to 2,730kg.  Aircraft operators must
present a valid copy of insurance prior to issue of the voucher. -
two week stay 12.92 Standard 2.58 15.50 13.75 Standard 2.75 16.50 1.00 6%
The application process is the same as for a
normal indemnity certificate/permit.  The cost
is £14.50 for 2 weeks.  Voucher is non-
transferable.
Landing Loyalty Cards - A card with 5 sections which all get
stamped after each landing.  The first 4 are paid and the 5th
one is free and the card is complete. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0%
Cards to be produced with a unique number.
Fire Training Courses - Extinguisher Training and bespoke fire
training can all be arranged locally - phone for details. 17.08 Standard 3.42 20.50 17.92 Standard 3.58 21.50 1.00 5%
Price is per delegate.  Bespoke training
costs are based on customer requirements.
Fire Training Courses - Fire Warden Training and bespoke fire
training can all be arranged locally - phone for details. 15.00 Standard 3.00 18.00 15.83 Standard 3.17 19.00 1.00 6%
Price is per delegate.  Bespoke training
costs are based on customer requirements.
Miscellaneous - Event Bookings, Special Promotions, Business
Rates can be arranged and costs vary according to
requirements.  Business rates are subject to approval from
Strategic Transportation Manager. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0%
These require various periods of notification
and will require approval in advance.  Any
information on events or promotions will be
advertised on the airports website.
Penalties - Landing or taking off without an indemnity or
registered users certificate (Coll and Colonsay) and trespass
on the airport without approval from the Airport Authority (inc
the release of animals). 80.00 Outwith the scope 0.00 80.00 85.00
Outwith
the scope 0.00 85.00 5.00 6%
Landing/taking off without indemnity - 6
month ban and £75 to be paid within one
calendar month, £710 per month thereafter. 
Trespassing on airport grounds £710.
Penalties - Landing or taking off without an indemnity or
registered users certificate (Coll and Colonsay) and trespass
on the airport without approval from the Airport Authority (inc
the release of animals). 753.00 Outwith the scope 0.00 753.00 798.00
Outwith
the scope 0.00 798.00 45.00 6%
Landing/taking off without indemnity - 6
month ban and £75 to be paid within one
calendar month, £710 per month thereafter. 
Trespassing on airport grounds £710.
Sale of aviation fuel
Based on variable monthly rate advised by
supplier TOTAL
In relation to the foregoing charges, the relevant Executive Director, where they consider it to be in the commercial interests of the Council and after consultation with the relevant Policy Lead and the Head of Financial Services, is authorised to negotiate and agree
variations of the foregoing charges for individual users or classes of users of the facilities in respect of their respective use of the facilities and the charges as varied shall be applied to such use as the Executive Director shall deem appropriate. In addition, the
Executive Director is authorised, after consultation with the relevant Policy Lead and the Head of Financial Services, to put in place suitable booking procedures for harbour and airport facilities and to take into account, inter alia, the level of bookings made by
individual users or classes of users when agreeing variations of the foregoing charges with individual users or classes of users.
Page 33 Airfields
Page 135

Page 136

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
NETWORK MANAGEMENT
Temporary Traffic Regulation Orders - Provision of Temporary
TRO 1,180.00 Outwith the Scope 0.00 1,180.00 1,251.00 Outwith the Scope 0.00 1,251.00 71.00 6%
Temporary Traffic Regulation Orders - Provision of Temporary
TRO for Annual Events (2nd year and thereafter) 591.00 Outwith the Scope 0.00 591.00 626.00 Outwith the Scope 0.00 626.00 35.00 6%
Temporary Traffic Regulation Orders - Provision of Extension
of Temporary TRO 591.00 Outwith the Scope 0.00 591.00 626.00 Outwith the Scope 0.00 626.00 35.00 6%
Temporary Traffic Regulation Orders - Provision of
Emergency Notice TRO 591.00 Outwith the Scope 0.00 591.00 626.00 Outwith the Scope 0.00 626.00 35.00 6%
Controlled Signing- Removal of Illegal Signs AT COST Outwith the Scope 0.00 0.00 Outwith the Scope 0.00 0.00 0.00 0%
Controlled Signing - Release of impounded signs 23.00 Outwith the Scope 0.00 23.00 24.00 Outwith the Scope 0.00 24.00 1.00 4%
Scaffoldings & Hoardings - Fees for Licence 120.00 Outwith the Scope 0.00 120.00 127.00 Outwith the Scope 0.00 127.00 7.00 6% Per 4 weeks
Scaffoldings & Hoardings - Extension of the licence 51.00 Outwith the Scope 0.00 51.00 54.00 Outwith the Scope 0.00 54.00 3.00 6%
One off charge for extension + £23.00 per
week or part thereof.
Builders skips placed on the Road - consideration of Licence 37.00 Outwith the Scope 0.00 37.00 39.00 Outwith the Scope 0.00 39.00 2.00 5%
Provision of signing and guarding AT COST + 12.5% Outwith the Scope 0.00 0.00 Outwith the Scope 0.00 0.00 0.00 0%
Permission to open up the Road by non Statutory
Organisations - Commercial 355.00 Outwith the Scope 0.00 355.00 376.00 Outwith the Scope 0.00 376.00 21.00 6%
Permission to open up the Road by non Statutory
Organisations - Residential 180.00 Outwith the Scope 0.00 180.00 191.00 Outwith the Scope 0.00 191.00 11.00 6%
Permission to erect Traffic Signals on Roads (1 Month) 125.00 Outwith the Scope 0.00 125.00 133.00 Outwith the Scope 0.00 133.00 8.00 6%
Permission to erect Traffic Signals on Roads (Up to 3 Months) 249.00 Outwith the Scope 0.00 249.00 264.00 Outwith the Scope 0.00 264.00 15.00 6%
Permission to erect Temporary Signs for Events (Up to 3
Months) 125.00 Outwith the Scope 0.00 125.00 133.00 Outwith the Scope 0.00 133.00 8.00 6%
Permission to erect Sign for New Development (Up to 12
Months) 622.00 Outwith the Scope 0.00 622.00 659.00 Outwith the Scope 0.00 659.00 37.00 6%
RCC Inspections (per RCC) 67.50 Standard 13.50 81.00 71.67 Standard 14.33 86.00 5.00 6%
£81.00 per £1,000 of Road Bond Value.
Option of Time in Line to be available.
RCC Processing (Initial Application + 1 Review) NIL Standard 0.00 0.00 Standard 0.00 0.00 0.00 0%
RCC Processing (Further Reviews)
STAFF COSTS +
ON-COSTS Standard 0.00 0.00 Standard 0.00 0.00 0.00 0%
Staff Costs + On costs for Sub Standard
Application
Street Works Register Fines  - Fines are levied at a cost of
£120 per breach
STATUTORY
CHARGE 120.00 Outwith the Scope 0.00 120.00 120.00 Outwith the Scope 0.00 120.00 0.00 0%
This fine can be reduced to £80 if paid within 30 days
STATUTORY
CHARGE 80.00 Outwith the Scope 0.00 80.00 80.00 Outwith the Scope 0.00 80.00 0.00 0%
Road Inspections as a result of Road Openings - 1st
Inspection
STATUTORY
CHARGE 36.00 Outwith the Scope 0.00 36.00 36.00 Outwith the Scope 0.00 36.00 0.00 0%
Road Inspections as a result of Road Openings - Further
Inspections (each inspection)
STATUTORY
CHARGE 36.00 Outwith the Scope 0.00 36.00 36.00 Outwith the Scope 0.00 36.00 0.00 0%
Removal of materials from Road AT COST + 12.5% Outwith the Scope 0.00 0.00 Outwith the Scope 0.00 0.00 0.00 0%
This is for assessment and Permission.
Not supply and erection.
Street Works Register - Fines  - Fines are
only levied against Utility Companies if they
breach the recording of road openings on
the Street Works Register, As determined
by the Roads Network and Standards
Manager.
These charges are set by Roads Authority
and Utility Committee (Scotland) under
NRSWA.
2025-26 2026-27 Increase
Plus cost of advert plus cost of traffic
management
1 - Temporary Traffic Regulation Orders
(TTRO) costs should be met in full by the
organiser promoting the event. Fees include
minimal administration costs from the
Council and advertising costs from local
newspapers.
2 - Cost of adverts will vary depending on
the publication in which they are placed. In
some circumstances, events may require to
be advertised in multiple publications, where
this is the case the applicant will be required
to meet these costs.
For each and every opening. To be charged
at commercial rate unless advised
differently by Roads Network and Standards
Manager
Page 34 Network Manage't & Public Trans
Page 136

Page 137

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2025-26 2026-27 Increase
Re-locating Street Lights or Other Street Furniture AT COST + 12.5% Standard 0.00 0.00 Standard 0.00 0.00 0.00 0%
Site Clearance after Accidents AT COST + 12.5% Outwith the Scope 0.00 0.00 Outwith the Scope 0.00 0.00 0.00 0%
Salt Bins
AT COST +
REFILL Standard 0.00 0.00 Standard 0.00 0.00 0.00 0%
Traffic Regulation Order to Extend a Speed Limit or Similar 1,350.00 Outwith the Scope 0.00 1,350.00 1,431.00 Outwith the Scope 0.00 1,431.00 81.00 6%
Plus Cost of Advert
Stopping up or re-determining access up to 200m long 1,689.00 Outwith the Scope 0.00 1,689.00 1,790.00 Outwith the Scope 0.00 1,790.00 101.00 6% Plus Cost of Advert
Stopping up or re-determining access over 200m long 2,113.00 Outwith the Scope 0.00 2,113.00 2,240.00 Outwith the Scope 0.00 2,240.00 127.00 6% Plus Cost of Advert
School & Public Transport
Mini Bus Hire - up to 4 hours 46.67 Standard 9.33 56.00 49.17 Standard 9.83 59.00 3.00 5%
Mini Bus Hire - per Day 93.33 Standard 18.67 112.00 99.17 Standard 19.83 119.00 7.00 6%
Privilege rides within school transport (cost per child per term) 105.00 Zero Rated 0.00 105.00 110.00 Zero Rated 0.00 110.00 5.00 5%
Privilege rides within school transport (where there are 2 or
more children, cost per child) 88.00 Zero Rated 0.00 88.00 92.00 Zero Rated 0.00 92.00 4.00 5%
Page 35 Network Manage't & Public Trans
Page 137

Page 138

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
PARKING
Per 15 mins up to
4 hrs 0.25 Standard 0.05 0.30 0.29 Standard 0.06 0.35 0.05 17%
Per 30 mins up to
4 hrs 0.42 Standard 0.08 0.50 0.50 Standard 0.10 0.60 0.10 20%
Per 45 mins up to
4 hrs 0.67 Standard 0.13 0.80 0.75 Standard 0.15 0.90 0.10 13%
Per 60 mins up to
4 hrs 0.83 Standard 0.17 1.00 1.00 Standard 0.20 1.20 0.20 20%
Per hour thereafter
-4 to 10hrs 0.83 Standard 0.17 1.00 1.00 Standard 0.20 1.20 0.20 20%
Quarterly Season 115.83 Standard 23.17 139.00 133.17 Standard 26.63 159.80 20.80 15%
6 Monthly Season 215.00 Standard 43.00 258.00 247.25 Standard 49.45 296.70 38.70 15%
9 Monthly Season 309.17 Standard 61.83 371.00 355.50 Standard 71.10 426.60 55.60 15%
Annual Season 407.50 Standard 81.50 489.00 468.67 Standard 93.73 562.40 73.40 15%
All Oban, Lorn & Isle Car Parks - Oban Car Parks (Except
Corran No.1, Longsdale Road Car Park and Lochavullin Car
Park) 
Ganavan Car Park
Monthly Permit 50.00 Standard 10.00 60.00 57.50 Standard 11.50 69.00 9.00 15%
All Oban, Lorn & Isle Car Parks - Oban Car Parks (Except
Corran No.1, Longsdale Road Car Park and Lochavullin Car
Park) 
Ganavan Car Park
Weekly Permit 25.00 Standard 5.00 30.00 28.75 Standard 5.75 34.50 4.50 15%
Per hour 0.83 Standard 0.17 1.00 1.00 Standard 0.20 1.20 0.20 20%
Per day 7.50 Standard 1.50 9.00 8.58 Standard 1.72 10.30 1.30 14%
Per 15 mins -
Maximum 4 hrs 0.25 Standard 0.05 0.30 0.29 Standard 0.06 0.35 0.05 17%
Per 30 mins -
Maximum 4 hours 0.42 Standard 0.08 0.50 0.50 Standard 0.10 0.60 0.10 20%
Per 45 mins -
Maximum 4 hours 0.67 Standard 0.13 0.80 0.75 Standard 0.15 0.90 0.10 13%
Per 60 mins -
Maximum 4 hours 0.83 Standard 0.17 1.00 1.00 Standard 0.20 1.20 0.20 20%
Per 15 mins 0.25 Standard 0.05 0.30 0.29 Standard 0.06 0.35 0.05 17%
Per 30 mins 0.42 Standard 0.08 0.50 0.50 Standard 0.10 0.60 0.10 20%
Per 45 mins 0.67 Standard 0.13 0.80 0.75 Standard 0.15 0.90 0.10 13%
Per 60 mins 0.83 Standard 0.17 1.00 1.00 Standard 0.20 1.20 0.20 20%
0 to 8 hours 0.92 Standard 0.18 1.10 1.08 Standard 0.22 1.30 0.20 18%
Increase proposed as a budget saving.
8 to 24 hours 8.33 Standard 1.67 10.00 9.58 Standard 1.92 11.50 1.50 15%
Increase proposed as a budget saving.
Per 15 mins - up
to 4 hrs 0.25 Standard 0.05 0.30 0.29 Standard 0.06 0.35 0.05 17%
Increase proposed as a budget saving.
Per 30 mins - up
to 4 hours 0.42 Standard 0.08 0.50 0.50 Standard 0.10 0.60 0.10 20%
Increase proposed as a budget saving.
Per 45 mins - up
to 4 hours 0.67 Standard 0.13 0.80 0.75 Standard 0.15 0.90 0.10 13%
Increase proposed as a budget saving.
Helensburgh - Sinclair Street
First 2 hours free, 2 hours thereafter can be paid for up to a
maximum of 4 hours total.  No return within 24 hours.
Oban – Longsdale Road Car Park and Lochavullin Car Park
First 2 hours free
Commercial Parking
Helensburgh Pier Area B Car Park
Lochavullin and Longsdale Coach and Lorry Parks - Oban
Lochgilphead Lorne Street Coach and Lorry Park
Seasonal Car Parks 
Corran No.1
Inveraray
Seasonal Car Parks 
Corran No.1
Inveraray                                                                                                                
Arrochar Glenloin No.1 and No.2
Two weeks suspension of charges prior to
Christmas.
Increase proposed as a budget saving.
2025-26 2026-27 Increase
Oban Car Parks (Except Corran No.1, Longsdale Road Car
Park and Lochavullin Car Park) 
Ganavan Car Park
Helensburgh Including Pier Area A,
Dunoon
Rothesay 
Luss
Page 36 Parking
Page 138

Page 139

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
2025-26 2026-27 Increase
Per 60 mins - up
to 4 hours 0.83 Standard 0.17 1.00 1.00 Standard 0.20 1.20 0.20 20%
Increase proposed as a budget saving.
Per hour thereafter
-4 to 10hrs 0.83 Standard 0.17 1.00 1.00 Standard 0.20 1.20 0.20 20%
Increase proposed as a budget saving.
Seasonal Car Parks - Permits Seasonal Period 90.00 Standard 18.00 108.00 103.50 Standard 20.70 124.20 16.20 15% Increase proposed as a budget saving.
Statutory Charge
Paid within 14
days 50.00 Zero Rated 0.00 50.00 50.00 Zero Rated 0.00 50.00 0.00 0%
Statutory Charge
Paid after 14 days 100.00 Zero Rated 0.00 100.00 100.00 Zero Rated 0.00 100.00 0.00 0%
On Street Parking - Inner Zone Oban
First 30 minutes free at the following:  Argyll Square, Queens
Park Place, William Street, Corran Esplanade, George Street. 
Maximum stay of 2 hours total.
Per 40 mins -
Limited to 2 hours
maximum 0.80 Outwith the Scope 0.00 0.80 0.90 Outwith the Scope 0.00 0.90 0.10 13%
Increase proposed as a budget saving.
On Street Parking - Outer Zone Oban
Maximum stay 4 hours expect Gallanach Road and Ganavan
Road which are all day parking.
Per 40 mins -
Limited to 4 hours
maximum 0.80 Outwith the Scope 0.00 0.80 0.90 Outwith the Scope 0.00 0.90 0.10 13%
Increase proposed as a budget saving.
Annual Charge 98.00 Outwith the Scope 0.00 98.00 112.70 Outwith the Scope 0.00 112.70 14.70 15% Increase proposed as a budget saving.
Quarterly Charge 36.00 Outwith the Scope 0.00 36.00 41.40 Outwith the Scope 0.00 41.40 5.40 15% Increase proposed as a budget saving.
Staff Permits - Municipal Buildings - Oban Annual 81.67 Standard 16.33 98.00 93.92 Standard 18.78 112.70 14.70 15% Increase proposed as a budget saving.
ELECTRIC VEHICLES CHARGING
Charge Per Kwh 0.58 Standard 0.12 0.70 0.62 Standard 0.12 0.74 0.04 6%
1st Hour 30.00 Outwith the Scope 0.00 30.00 30.00 Outwith the Scope 0.00 30.00 0.00 0%
10 min grace period then £30 charge up to
one hour overstay
2nd Hour 30.00 Outwith the Scope 0.00 30.00 30.00 Outwith the Scope 0.00 30.00 0.00 0%
Additional £30 for overstaying a second
hour. Penalty capped at 2 hours [£60]
Overstay Penalty Charges
Seasonal Car Parks 
Corran No.1
Inveraray
Seasonal Car Parks 
Corran No.1
Inveraray                                                                                                                
Penalty Charge Notices
Residents Permit
PCNs are statutory charges and the level is
set by the Scottish Government
Page 37 Parking
Page 139

Page 140

Description Other
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
Photocopying/Printing A4 (black & white) per side 0.25 Standard 0.05 0.31 0.27 Standard 0.05 0.32 0.01 5%
Photocopying/Printing A4 (coloured) per side 0.43 Standard 0.02 0.46 0.48 Standard 0.08 0.48 0.02 5%
Photocopying/Printing - Colour - per side (A3) 0.88 Standard 0.00 0.88 0.93 Standard 0.16 0.93 0.05 6%
Photocopying/Printing - Black and White - per side (A3) 0.42 Standard 0.00 0.42 0.46 Standard 0.08 0.45 0.03 7%
PRODUCTION GENRE Classification (Budget)
Net
£ VAT Rate
VAT
£
Gross
£
Net
£ VAT Rate
VAT
£
Gross
£ £ %
Notes/Comments
FEATURE FILM
Major US: eg Bond, Jurassic World High End (> £100m) 1,689.17 Standard 337.83 2,027.00 1,790.83 Standard 358.17 2,149.00 122.00 6% Daily charge
Large US: eg Les Miserable Medium High (> £60m) 1,289.17 Standard 257.83 1,547.00 1,366.67 Standard 273.33 1,640.00 93.00 6% Daily charge
Major UK/US Indie: eg Rush, Theory of Everything Medium (> £20m) 884.17 Standard 176.83 1,061.00 937.50 Standard 187.50 1,125.00 64.00 6% Daily charge
Medium: eg The Worlds End Medium/Low (>£10m) 643.33 Standard 128.67 772.00 681.67 Standard 136.33 818.00 46.00 6% Daily charge
Low: eg 71, Alan Partridge, Alpha Papa Low (> £1.5m) 321.67 Standard 64.33 386.00 340.83 Standard 68.17 409.00 23.00 6% Daily charge
Micro: eg IFeatures Micro (<£1.5m) 67.50 Standard 13.50 81.00 71.67 Standard 14.33 86.00 5.00 6% Daily charge
TELEVISION
Domestic/International receiving Tax Relief: eg Penny
Dreadful, The Game High End Tax Relief 884.17 Standard 176.83 1,061.00 937.50 Standard 187.50 1,125.00 64.00 6%
Daily charge
Period Drama: eg Call the Midwife, The Village High End Domestic 723.33 Standard 144.67 868.00 766.67 Standard 153.33 920.00 52.00 6% Daily charge
Soap/Drama Series: eg Sherlock, Corrie, EastEnders Medium 643.33 Standard 128.67 772.00 681.67 Standard 136.33 818.00 46.00 6% Daily charge
Sitcom/Comedy/Drama: eg Family Tree, My Mad Fat Diary Medium 401.67 Standard 80.33 482.00 425.83 Standard 85.17 511.00 29.00 6%
Daily charge
Pilot/Light Entertainment/High End Documentaries/Factual: eg
Springwatch, Great British Bake Off Low
141.67 Standard 28.33 170.00 150.00 Standard 30.00 180.00 10.00 6%
Daily charge
Low-end Doc/Factual: eg Great Railway Journeys Low 67.50 Standard 13.50 81.00 71.67 Standard 14.33 86.00 5.00 6% Daily charge
COMMERCIALS
High Profile: eg :McDonalds, Lagavulin Whisky (International) High (> £1m) 805.83 Standard 161.17 967.00 854.17 Standard 170.83 1,025.00 58.00 6%
Daily charge
Medium Profile: eg: Ford, Skoda, Peugeot (National) Medium (< £1m) 482.50 Standard 96.50 579.00 511.67 Standard 102.33 614.00 35.00 6% Daily charge
Low Profile: eg: Short promos (Regional) Low (< £0.250m) 141.67 Standard 28.33 170.00 150.00 Standard 30.00 180.00 10.00 6% Daily charge
MUSIC VIDEOS
High Profile: eg Florence and the Machine High 120.00 Standard 24.00 144.00 127.50 Standard 25.50 153.00 9.00 6% Daily charge
Low Profile: eg Corporate etc. Low 67.50 Standard 13.50 81.00 71.67 Standard 14.33 86.00 5.00 6% Daily charge
2026-27 Increase2025-26
COUNCIL WIDE CHARGES 2025-26 Increase2026-27
FILMING FACILIATION AND SUPPORT SERVICES
Page 38 General
Page 140

Page 141

ARGYLL AND BUTE COUNCIL
FINANCIAL SERVICES
COUNCIL
25 FEBRUARY 2026
FINANCIAL RISKS ANALYSIS 2026-27  
1 EXECUTIVE SUMMARY 
1.1 The main purpose of this report is to provide a summary of the key financial risks
facing the council.   
1.2 A number of council wide financial risks, both revenue and capital, have been
identified, in addition to specific departmental or service risks.  For each
departmental risk, the potential annual financial impact has been quantified, and
the likelihood of the risk materialising assessed, based on a standard risk matrix. 
1.3  There are currently 6 council wide revenue risks identified for 2026-27, with a
potential annual value totalling £7.1m, and with varying degrees of likelihood. 
1.4 There are currently 30 departmental risks, with a potential annual value totalling
£4.557m, of which 5 are categorised as ‘Likely’.   
1.5 Financial risks are monitored and reviewed on an ongoing basis, with actions put
in place to continue to mitigate or manage these risks.     
Page 141 Agenda Item 2c

Page 142

ARGYLL AND BUTE COUNCIL
FINANCIAL SERVICES
COUNCIL
25 FEBRUARY 2026
FINANCIAL RISKS ANALYSIS 2026-27  
2. INTRODUCTION 
2.1 This report outlines the process and approach to financial risk assessment and
provides details of the currently known key financial risks facing the council in
2026-27. 
3 DETAIL 
3.1 Introduction 
3.1.1 The council is currently in a period of significant financial challenge.  In developing
its budget to address both funding, and cost and demand pressures,
consideration is given to financial risk.  However, both existing and new or
emerging financial risks require to be monitored and reviewed on an ongoing
basis throughout the year, with actions put in place to mitigate or manage these
risks.  Risks that cannot be mitigated or managed may have a detrimental impact
on the financial position of the council. 
3.1.2 There are a number of risks that may impact income or expenditure across the
entire council.  These are identified as council wide risks.  In addition, specific
financial risks impacting each department or service of the council have been
considered.  These are identified as departmental/service risks.  A de-minimis
level of £50k has been applied.  Risks with a potential annual risk value below this
level are expected to be managed within the relevant overall service budget. 
3.1.3 For each risk, the potential annual financial impact has been quantified and the
likelihood assessed based on the following standard risk matrix: 
1 – Remote
2 – Unlikely
3 – Possible
4 – Likely
5 – Almost Certain 
3.2 
3.2.1
Council Wide Risks 
General 
There is a risk of further severe weather incidents, requiring both revenue and
capital expenditure to be incurred.  Whilst there may be additional funding
available through the Bellwin Scheme, this is limited to eligible revenue
expenditure only and there is an assumption that local authorities will budget to
cover a proportion of the costs of emergency incidents from within internal
resources.  The threshold over and above where Councils’ can claim for eligible
Page 142

Page 143

expenditure is 0.2% of a local authority's budgeted net revenue expenditure and,
for 2025-26, this equates to £0.613m for Argyll and Bute Council.  In 2025-26
additional budget of £2.9m was provided in respect of severe weather incidents
however there is no provision for additional costs in this respect within either the
2026-27 Revenue Budget or the 2026-29 Capital Plan The potential additional
costs are difficult to estimate by their very nature, however, a potential risk value
of £3m is deemed to be reasonable. 
Revenue 
3.2.2 Whilst the 2026-27 draft budget provides for inflationary increases, there is a risk
of continued volatility in utilities pricing and demand can also be subject to
unpredictable weather extremes.  A potential annual risk value equivalent to 5%
of the annual utilities budget provision is deemed reasonable.  This equates to
£0.4m. 
3.2.3  In respect of the Health and Social Care Partnership, it is the responsibility of the
Chief Officer and Chief Financial Officer to manage the HSCP financial position. 
If an overspend is forecast, a budget recovery plan will be prepared and
submitted to the IJB, Argyll and Bute Council and NHS Highland.  Where recovery
plans are unsuccessful and an overspend occurs at the financial year end, and
there are insufficient reserves to meet the overspend, then the partners will be
required to make additional payments to the HSCP.  The council would have to
contribute towards any overspend related to Social Work.  Whilst any additional
payments by the council and NHS Highland will be deducted from future years
funding, there is a risk that the council may require to make an additional
unbudgeted contribution to the HSCP during the year. The financial situation
facing Social Work is extremely challenging due to rising demand for services,
workforce shortages and the increasing complexity of care which are pushing
costs upward at a pace that exceeds available funding.  At the same time,
inflationary pressures and the need to maintain safe staffing levels are stretching
already constrained budgets.  At the time of writing this report, the forecast Social
Work budget for 2026-27 has a £2.872m funding gap, after accounting for
additional contributions from the council in respect of pay award budget
assumptions and assuming all proposed savings are accepted by the IJBWithin
the budget pack it is recommended that Members consider a funding allocation to
bridge this gap however there remains a risk that should the HSCP fail to deliver
on their savings proposals, or further pressures are identified, the council may
require to make an additional unbudgeted contribution to the HSCP during the
year  At this stage, the overall potential annual risk value has been estimated at
£2m. 
3.2.4 The estimated level of Council Tax income is based on current and forecast Band
D equivalents, and reflects our expected collection rates, based on historical data. 
A potential annual risk value equivalent to 1% of the annual Council Tax income
budget is deemed reasonable.  This equates to £0.8m. 
3.2.5  The 2026-27 Budget Pack includes both Operational/Management and Policy
savings options, totalling £6.090m.  Whilst the council has a good track record in
delivering savings, there is a risk that this target will not be fully delivered.  A
Page 143

Page 144

potential annual risk value equivalent to a 10% shortfall in the annual savings
target is deemed reasonable.  This equates to £0.6m. 
3.2.6  There is an ongoing requirement to fund unavoidable inflationary cost increases
across a number of areas such as, food and fuel.  The Bank of England is
currently forecasting that inflation will continue to fall throughout the year, towards
the 2% government target.  This position will continue to be closely monitored,
with financial forecasts updated to reflect information available on an ongoing
basis.  The annual budget is underpinned by inflationary assumptions, however,
there is a risk that inflationary impacts have been under-estimated. A potential
annual risk value equivalent to 10% of the inflationary assumptions in respect of
relevant non-pay budgets is deemed reasonable.  This equates to £0.3m. 
3.2.7 The council’s Property Services currently facilitate and manage repairs,
maintenance and renewals in respect of the council’s property asset portfolio,
funded via annual revenue Central Repairs Account (CRA) budgets and capital
resources allocated to asset sustainability. Annual CRA budget allocations have
been consistently overspent in recent years due to an ageing estate, increasing in
statutory testing, emergency repairs and increases in supplier/contractor charges.
Within the budget pack the Review of Capital Arrangements Report addresses this
issue by proposing a multi-year Corporate Property Repairs, Maintenance and
Renewals Programme, supporting a longer-term strategic approach to planning
which would include a financial commitment to fund this for a period of 3 years
initially. There is a risk that if this recommendation is not approved by Council
then the current CRA budgets would be insufficient to meet demands. 
Capital 
3.2.8 The Finance Circular 1/2026 received on 13 January 2026 provided details of
Scottish Government grant funding for 2026-27.  There is, therefore, a degree of
certainty in respect of General Capital Grant funding for 2026-27, with 2027-28
funding assumed at the same level.  At the time of writing, the council’s share of
an additional £20m Climate Emergency Fund, to be paid as General Capital Grant
in 2026-27, has still to be confirmed.  The Capital Plan has assumed additional
funding of £0.482m in this respect for 2026-27 only.  Any variation in the
allocation of 2026-27 Climate Emergency Funding, or in the available 2027-28
General Capital Grant, from these assumptions will require to be managed within
the overall Capital Plan resources.   
3.2.9  The funding framework for the approved Capital Plan includes capital receipts
from asset sales, estimated at £2.0m over the 2 years 2026-28, profiled £1.5m
2026-27 and £0.5m 2027-28.  This is based on an assessment provided by the
Estates Team in January 2026.  However, it should be noted that this is largely
predicated on a single significant sale value being delivered in 2026-27.  The level
of receipts that may reasonably be achieved will be kept under review, to reflect
changing market conditions and due diligence undertaken on asset
condition.  Any variation from this assumption will require to be managed within
the overall Capital Plan resources.  It is generally the case that the capital
programme experiences slippage throughout the year and as such, this risk is
expected to be manageable.  
Page 144

Page 145

3.2.10 The overall funding framework for capital and the affordability of capital
investment is based on a set of assumptions in respect of several variables, which
will continue to be subject to change on an ongoing basis, for example, slippage
in the delivery of capital projects or changes to interest rate forecasts.  The
Section 95 Officer will require to take a strategic approach and exercise flexibility
within the capital funding framework, in order to manage the impact of investment
decisions on the annual revenue budget and in the context of safeguarding the
council’s longer term financial sustainability. 
3.2.11 The capital programme continues to be subject to significant inflationary price
increases, supply chain issues and longer lead in times, due to the impact of
world events on the global economy. Whilst these impacts have been managed to
date within available resources, there are likely to be other significant cost
pressures in respect of projects, where contracts have yet to be entered into,
which are not quantifiable, at this stage.  It will be challenging to manage these
impacts within available resources and target completion timescales.  Actions to
manage financial risk within available resources may include re-profiling, project
redesign, re-engineering or curtailment, and the re-prioritisation of uncommitted
resources across the programme. 
3.2.12 The council’s funding bid to the Scottish Government’s Learning Estate
Investment Programme (LEIP) for a new school campus on Mull was
successful.  While this is good news and will provide welcome investment in the
school estate, it will not meet the full cost of the project.  The funding gap requires
to be met by the council and presents a financial pressure.  The Scottish
Government will fund up to 50% of eligible costs, with the balance of circa. £20m
to be funded by the council.  To date, the council has earmarked reserves totalling
£9m in this respect.  Further consideration will be given to augmenting the current
level of provision towards the council’s funding contribution, as part of the 2026-
27 budget process. 
3.2.13 The Capital Plan monitoring report, as of 31 December 2025, outlines a forecast
overspend on the 2025-28 Capital Plan of £0.166m, however, this is expected to
be managed within existing available resources.  No additional spend approvals
are being sought in this respect, at this stage.  However, there are spending
requirements totalling £3.385m, deemed to be essential, either critical to maintain
service delivery, or to comply with legislation or regulation (Red RAG status risks),
that cannot be managed within existing available resources and Members will be
requested to approve additional resources in respect of these requirements. 
3.2.14  The council wide risks are summarised within the following table: 
Description  Likelihood
Assessed
Financial
Impact
£m
Unbudgeted Severe Weather costs 4 3.0
Energy costs increase by 5% greater than
budgeted
3 0.4
Page 145

Page 146

IJB refer to Council for additional funding to
deliver social work services 
3 2.0
1% variation in Council Tax Income 2 0.8
10% shortfall on Savings delivery 2 0.6
10% variation on General Inflation 3 0.3
Total  7.1 
3.3 Departmental/Service Risks 
3.3.1 It should be noted that the council has a good track record of delivering services
within budget, however, there are specific financial risks impacting each council
department or service.  The detail of each departmental financial risk is included
within Appendix 1.  The following table provides a summary of the number of risks
within each department, across each likelihood category, together with the
potential annual financial impact value. 
Department 1 - Remote 2 - Unlikely 3 - Possible 4 - Likely 5 - Almost
Certain Total
No £000 No £000 No £000 No £000 No £000 No £000
Chief
Executive's
Unit
0 0 0 0 0 0 0 0 0 0 0 0
Executive
Director
Douglas
Hendry
0 0 5 450 8 680 1 60 0 0 14 1,190
Executive
Director Kirsty
Flanagan
2 150 2 183 8 1,995 4 1,039 0 0 16 3,367
Total 2 150 7 633 16 2,675 5 1,099 0 0 30 4,557 
3.3.2  The current top 3 risks in terms of the financial impact are noted in the table below. 
SERVICE  TITLE OF
RISK 
DESCRIPTION OF RISK LIKELIHOOD
FINANCIAL
IMPACT
£000
Financial
Services
Non-
Domestic
Rates
A revaluation exercise is due
for the 2026-27 year and the
impact is not known. 
Assuming the rateable value of
the Council's taxed assets
increase at a similar annual
rate to those seen at the 2023-
24 revaluation, the result could
be an increase of circa 20%,
equivalent to around £1m. The
outcome of the 2023-24
appeals has still to be
concluded which could result in
a repayment hence this is only
being identified as a risk at this
stage.
3 1,000
Page 146

Page 147

Roads and
Infrastructure
Services
Piers &
Harbours
Income
Changes to ferry services
resulting in reduced berthing
and passenger income. As Cal
Mac work to provide services
across their network, an ageing
fleet and delays to new ferries
coming into service is meaning
larger ferries are being
removed from routes where we
have the berthing infrastructure
(mostly Craignure). Smaller
ferries are allowing for services
to operate but the drop in
income can be up to 75% per
berthing. 
4 700
Roads and
Infrastructure
Services
Roads
Maintenance
- Roads
Network
Adverse weather conditions
result in deterioration of the
road network necessitating
greater spend on repair of
defects. 
3 230 
3.3.3 The risks that are categorised as ‘likely’ are outlined in the table below. 
SERVICE  TITLE OF RISK  DESCRIPTION OF RISK LIKELIHOOD
FINANCIAL
IMPACT
£000
Roads and
Infrastructure
Services
Piers &
Harbours
Income
Changes to ferry services
resulting in reduced berthing
and passenger income. As
Cal Mac work to provide
services across their
network, an ageing fleet and
delays to new ferries
coming into service is
meaning larger ferries are
being removed from routes
where we have the berthing
infrastructure (mostly
Craignure). Smaller ferries
are allowing for services to
operate but the drop in
income can be up to 75%
per berthing. 
4 700
Development
and
Economic
Growth
Homelessness
Temporary
Accommodation
Income
Unpredictable number of
Homeless applications.
Inability to recover rent. 
Increase costs of property
maintenance and tenancy
change over.
4 150
Roads and
Infrastructure
Services
Fleet
Maintenance
Increased costs to maintain
internal fleet due to
inflationary increases on
vehicle parts.
4 100
Financial
Services
NDR ALEO
Relief Clawback
Risk that the Council will
experience a reduction in
General Revenue Grant due
to the phased clawback of
4 89
Page 147

Page 148

Non-Domestic Rates relief
awarded to ALEOs in
excess of the agreed
baseline, following
confirmation by the Scottish
Government that the ALEO
relief clawback policy will be
implemented in future years
with clawback applied two
years in arrears, beginning
in 2026-27 for excess relief
awarded in 2024-25.
Legal and
Regulatory
Support
Elections Should a bi-election be
required this would be an
immediate cost pressure as
budget has been removed. 
4 60 
3.4 Monitoring of Financial Risks 
3.4.1 Financial risks are monitored and reviewed on an ongoing basis, with actions put
in place to continue to mitigate or manage these risks.  The updated position on
financial risks will continue to be regularly reported to Policy and Resources
Committee.     
3.5 Potential Future Risks 
3.5.1 There is a risk that changes to government policy may require to be implemented
by the council, with associated unbudgeted costs not fully met by additional
funding.  For example, an extension to funded childcare to all 1 and 2 year olds
across Scotland. 
3.5.2 The Council’s bid to the Scottish Governments Learning Estate Investment
Programme (LEIP) for funding for a new school campus on Mull was successful
and a report was considered by Council on 24 April 2024.  Approval was granted
to utilise £5m of £9m previously earmarked funds to develop the Business Case. 
The Scottish Government will fund up to 50% of eligible costs and the estimated
cost is £43m, with £41m deemed eligible, however these are just estimates at this
stage.  The Council will need to make a decision as to whether to proceed once
the project has been tendered.  There is a risk that the cost will be higher than
estimated and consideration requires to be given to augmenting the current level
of provision towards the council’s potential funding contribution, based on current
affordability.  There is also a risk that delays associated with the ongoing Judicial
Review will result in further cost increases.   
3.5.3 The Scottish Government has announced proposals for reduced teacher class
contact time, the purpose of the reduced time teaching has yet to be agreed at
COSLA. However, it is likely that it will include planning, preparation and
increased collaboration.  This could be a phased implementation although again
no agreement has been reached. The aim is to empower teachers to deliver
better educational outcomes for our children and young people.  However, there
are ongoing concerns regarding the potential cost implications, the ability to
recruit to additional posts, the impact on subject specialist teaching time
Page 148

Page 149

especially in smaller secondary schools and the impact on other educational
services. 
3.5.4 The Scottish Government’s announcement for the 2026-27 budget included
investment in breakfast clubs and after-school clubs for schools. This included
universal breakfast clubs for every primary pupil by August 2027 and after school
clubs for all primary children who would like to access them.  At this stage it is
unclear how these initiatives will be funded and what the funding that is provided
will cover.  There is a risk that our large number of remote and rural schools will
have significantly higher costs to deliver these services to very small numbers of
children.  Furthermore, there may also be transport issues and recruitment and
resourcing issues. 
4 CONCLUSION 
4.1 This report summarises the known key financial risks facing the council in 2026-
27.  There are 6 council wide risks and 30 departmental risks identified, with 5
categorised as ‘Likely’.  These risks are monitored and reviewed on an ongoing
basis, with actions put in place to continue to manage or mitigate the risks.   
5 IMPLICATIONS 
5.1 Policy None.
5.2 Financial  Outlines the potential annual value of financial risks.   
5.3 Legal  None.
5.4 HR  None.
5.5 Customer Service  None.
5.6 Risk Provides details of financial risks.
5.7 Climate Change None.
5.8 Fairer Scotland Duty None.
5.9 Equalities (Protected
Characteristics)
None.
5.10 Consumer Duty None.
5.11 Island Communities None.
5.12 Children’s Rights and
Wellbeing
None. 
Kirsty Flanagan
Executive Director/Section 95 Officer
11 February 2026 
Councillor Ross Moreland, Policy Lead for Finance and Commercial Services 
APPENDICES
Appendix 1 – Detail of Department/Service financial risks. 
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk
Page 149

Page 150

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS 2026-27
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
Executive Director
Douglas Hendry
Commercial Services Catering Costs - Provision of
Meals to Early Years Children
The Children and Young People (Scotland) Act placed duties on Councils to
provide meals in an Early Years setting to entitled children where sessions span
over lunch time.  The total quantum of grant funding is reducing and may not be
sufficient to fund the additional costs depending on uptake and the additional
costs to support the meal provision in partner provider settings.
Joint strategy with procurement colleagues to reduce potential impact
of supplier charges.  Control food wastage/portion controls.
2 100
Executive Director
Douglas Hendry
Commercial Services Rental Income from Properties Due to current economic climate, there may be reduced ability to recover rental
income from leased properties or place suitable tenants in properties as leases
come to an end.
Management of leasehold properties by Estates team, any issues with
debt recovery being dealt with in line with Council debt recovery
policy.
3 100
Executive Director
Douglas Hendry
Commercial Services Surplus Properties Ongoing market difficulties lead to increased numbers of surplus properties, in
addition, as Our Modern Workspace Project gains traction more properties will
become surplus to operational requirements. There are residual running costs
associated with all surplus properties.
One Council property team in place who will monitor market
conditions and work with prospective tenants/ purchasers to let/sell
surplus properties.
3 50
Executive Director
Douglas Hendry
Education Pre-Five Units - retention of
partner providers
Failure in the commissioning or retention of pre-five partner provider units to
deliver 1140 hours would result in an increased pressure on the Council to
deliver the service.
Annual financial appraisal, uplift of sustainable rate to providers;
Support network; Short-term cash injections.
2 100
Executive Director
Douglas Hendry
Education Children and Young People
(Scotland) Act - ELC 1140 hours
The Council has been required to deliver 1140 hours of Early Learning and
Childcare since August 2021. The Scottish Government has committed to funding
this and the Council has revised its service model to align it to the Scottish
Government's reduced funding profile.  A risk remains that actual costs of
delivery exceeds available funding in any given year.  For example, if child
numbers are higher than estimated, this may require additional staffing which
has not been included in the staffing model funded by Scottish Government.  
Continuous monitoring and review of the service model, usage and
resources.
3 100
Executive Director
Douglas Hendry
Education ASN Support Demand for ASN support continues to increase. Scottish Government statistics
suggest 40.5% of school children have an identified additional support need, this
has more than doubled since 2014 from 20%, resulting in an additional resource
requirement particularly where gaps in our enhanced provision exist, the
geographical barrier which further hinders our ability to deliver equitable service
to all children requiring significant ASN support.  Further, the increase in Children
and Young People accessing support for mental health issues and the increased
numbers awaiting assessment for Neuro related issues can impact presentation
in education.  The medium-term detriments on the development of young
children which occurred as a consequence of service closures during the COVID
pandemic have increased demands on the service as children require additional
support to catch up.  The Additional Support for Learning National
Implementation plan continues to inform our strategic direction in line with the
Angela Morgan Review.
Service is currently implementing alternative options for service
delivery to mitigate the inescapable pressures. Continuing to ensure
robust assessment of needs, monthly monitoring of budget, any delays
in recruitment factored into projections to enable informed decision
making on allocation of funding for new/amended /additional support
packages. Following a full ASN review, the service are currently
investing in  four new learning centres in order to provide greater
equity in meeting the more complex needs of some learners as well as
considering plans to develop enhanced wellbeing resources across our
learning estate in future.  This aims to reduce the frequency of
children having to be educated in high cost out of area placements.
2 50
2026-27
Page 150

Page 151

DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
Executive Director
Douglas Hendry
Education Legislative Requirements -
Scottish Languages Act
The Scottish Parliament agreed the  Scottish Languages Act. This is Act gives the
Gaelic and Scots languages official status in Scotland and makes changes to the
support for the Gaelic and Scots languages in Scotland. This includes changes in
relation to Gaelic and Scots education. It is clear that an education authority’s
duty to secure the provision of adequate and efficient school education for the
authority’s area may include Gaelic learner education and Gaelic medium
education. This  no longer applies only in Gaelic speaking areas. The teaching of
the Gaelic language as part of an education authority’s duty to provide further
education also no longer applies only in Gaelic speaking areas. Therefore, these
powers (along with the other provisions within the Act)  also help to ensure that
Gaelic medium primary pupils are able to continue their Gaelic education in
secondary school. Catchment areas for Gaelic Provision must be set out and
whilst we have custom and practice we have not established these formally.
Engage with the new Act to understand fully the requirements for
Education Service and ensure continuous monitoring and review of
the service model and resources available within budget. Establish a
timeline to implement changes required by the Act. Continue to seek
to recruit more Gaelic Teachers on flexible contracts.
3 50
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Hub DBDA/DBFM Schools  -
Litigation
Increased risk of the requirement to litigate due to latent defects in a number of
schools
Ongoing reporting of issues and monitoring of actions taken to repair. 2 150
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Legal Services - Litigation Increased number of litigation cases. Ensure Legal Services are gateway to access all legal advice and that
advice is sought at earliest opportunity.
3 150
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Contract RPI for NPDO and Hub
Schools
Increase in RPI would result in higher costs. Monitoring annual alteration to contract RPI rate and mitigation
through financial forecasting and review of existing budget.
3 100
Executive Director
Douglas Hendry
Legal and Regulatory
Support
NPDO - Increase in insurance
costs within NPDO Schools
Increase in insurance costs as a result of the long-term effects of Covid-19 on the
insurance market and flood claims.
Monitoring annual alteration to contract insurance rate and mitigation
through financial forecasting and review of existing budget.
3 75
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Elections Should a bi-election be required this would be an immediate cost pressure as
budget has been removed.
Outwith direct management control. 4 60
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Licensing Reduced numbers of licensing applications leading to reduced income. Monitoring of trends and reporting the financial impact in the budget
monitoring.
3 55
Executive Director
Douglas Hendry
Legal and Regulatory
Support
NPDO/Hub DBFM contract
management efficiencies
Reduction in ability to generate contract management efficiencies. Monitoring annual efficiencies generated and mitigation through
robust contract management and application of contract
specifications / requirements.
2 50
Executive Director
Kirsty Flanagan
Customer Support
Services
Software Licences Potential risk of being under licensed for software which will be identified via
software audits which would incur additional costs.
ICT security and compliance officer in post and duties include review
of systems to ensure fully licenced. 
2 100
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Homelessness Temporary
Accommodation Income
Unpredictable number of Homeless applications. Inability to recover rent. 
Increase costs of property maintenance and tenancy change over.
Provision of Housing Options information and advice service to
minimise number of applicants proceeding to full homeless
application. Implementation of Rapid Rehousing Plan.
4 150
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Dangerous Buildings
Interventions
Building Standards having to deal with an increasing level of dangerous building
work which has significant financial implications for Council.
Monitor activity and seek to recover costs from the owner. 3 100
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Planning fee shortfalls Due to downturn in economic / building activity, in particular renewable energy
development and other major developments could lead to planning fee income
shortfalls leading to revenue budget pressures.
Current income levels are looking more positive, however, we are
dependent on some high value applications coming in which, if they
don't materialise, will impact the overall position.  Will continue to
monitor Development Management income and expenditure tightly
and investigate further income generation streams.
1 100
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Building Warrant fee shortfalls Due to loss of commercial income and downturn in economic / building activity,
building warrant fee income shortfalls leading to revenue budget pressures.
Continue to monitor Building Standards income and expenditure
tightly and investigate further income generation streams.
1 50
Page 151

Page 152

DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
Executive Director
Kirsty Flanagan
Financial Services Non-Domestic Rates A revaluation exercise is due for the 2026-27 year and the impact is not known. 
Assuming the rateable value of the Council's taxed assets increase at a similar
annual rate to those seen at the 2023-24 revaluation, the result could be an
increase of circa 20%, equivalent to around £1m. The outcome of the 2023-24
appeals has still to be concluded which could result in a repayment hence this is
only being identified as a risk at this stage.
Outwith direct management control. 3 1,000
Executive Director
Kirsty Flanagan
Financial Services NDR ALEO Relief Clawback Risk that the Council will experience a reduction in General Revenue Grant due
to the phased clawback of Non-Domestic Rates relief awarded to ALEOs in excess
of the agreed baseline, following confirmation by the Scottish Government that
the ALEO relief clawback policy will be implemented in future years with
clawback applied two years in arrears, beginning in 2026-27 for excess relief
awarded in 2024-25.
Monitoring of ALEO NDR relief against baseline; engagement with Live
Argyll and Corporate Finance; financial planning to reflect anticipated
General Revenue Grant reductions.
4 89
Executive Director
Kirsty Flanagan
Financial Services Sundry Debt Recovery Recovery of debt becomes more difficult to pursue in the current economic
climate. 
Additional staff have been put in place in the Sundry Debt Team and
remaining vacancies will be advertised shortly. This team  will work
jointly with Legal Services to enhance the robustness of the Council's
debt recovery processes.
3 85
Executive Director
Kirsty Flanagan
Financial Services Housing Benefit Subsidy Ongoing pressure arising from limitations in Housing Benefit subsidy for
temporary and supported exempt accommodation, where eligible rent exceeds
subsidy thresholds. Current costs are expected to be managed within Financial
Services budgets, but exposure could increase if demand or rent levels rise.
Active monitoring of Housing Benefit expenditure and subsidy; budget
management within Financial Services; use of in-year underspends to
offset pressures; and review as part of financial planning.
2 83
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Piers & Harbours Income Changes to ferry services resulting in reduced berthing and passenger income. As
Cal Mac work to provide services across their network, an ageing fleet and delays
to new ferries coming into service is meaning larger ferries are being removed
from routes where we have the berthing infrastructure (mostly Craignure).
Smaller ferries are allowing for services to operate but the drop in income can be
up to 75% per berthing.
Closely monitor passenger number information coming from CalMac
to identify any emerging trends with reducing passenger numbers. 
There is continuing conversation with CalMac to agree an annual flat
fee for berthing which would remove the risk that we have with the
current system.
4 700
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Roads Maintenance - Roads
Network
Adverse weather conditions result in deterioration of the road network
necessitating greater spend on repair of defects.
Manage maintenance budgets to ensure that spend is prioritised to
deal with safety defects.
3 230
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Car Parking Income Reduced number of visitors to the area and use of council owned car parks
resulting in a reduction in income.
Closely monitor income levels throughout the year, especially in high
visitor seasons.
3 200
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Winter Maintenance Adverse weather conditions which require greater than budgeted number of
gritting runs.
Monitor weather conditions and apply gritting policy to minimise
costs.
3 150
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Other Harbours - Repairs and
Maintenance
Ageing assets and cost increases for repair work required to be undertaken. Unable to capitalise work carried out, service are aware of this as part
of the wider RIS review as costs likely to reoccur if assets not replaced
3 130
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Street Lighting Age of lighting stock requires greater maintenance as health and safety becomes
a consideration.
Manage maintenance budgets to ensure that spend is prioritised to
deal with safety defects.
3 100
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Fleet Maintenance Increased costs to maintain internal fleet due to inflationary increases on vehicle
parts.
Review of Fleet underway to determine where reductions could
possibly be made.
4 100
30 4,557
Page 152

Page 153

ARGYLL AND BUTE COUNCIL COUNCIL
FINANCIAL SERVICES 25 FEBRUARY 2026
RESERVES AND BALANCES – UPDATED FOR BUDGET PACK 2026-27 
1 EXECUTIVE SUMMARY 
1.1 The main purpose of this report is to advise Members of the overall level of
reserves held by the Council as well as providing detail on the monitoring of the
earmarked balances held within the General Fund.   
1.2 The Council has a total of £405.561m unusable reserves that are not backed with
resources.  They are required purely for accounting purposes. 
1.3 At 31 March 2025 the Council had a total of £121.235m usable reserves.  Of this: 
 £3.608m related to the Repairs and Renewals Fund;
 £3.358m related to Capital Funds;
 £1.564m Capital Grants Unapplied; and
 £112.705m was held in the General Fund with £105.162m of this balance
earmarked for specific purposes. 
1.4 The Council’s General Fund contingency remains at 2% of net expenditure.  This
monetary level has been adjusted to take account of the revised net revenue
expenditure proposed for 2026-27.  The revised contingency of 2% of net
expenditure amounts to £7.174m.   
1.5 As at 31 December 2025 the forecast outturn for 2025-26 was estimated to be an
overspend of £0.627m, however, this is subject to change during the final quarter
of the financial year.  Taking this outturn into consideration alongside the forecast
underspend on the Loans Fund, the contributions to standby budgets and the
Royal National Mod, the forecast surplus over contingency at 31 March 2026 is
estimated at £0.481m, however, this is an estimated position and subject to
change. 
1.6 Assessing the adequacy of reserves should take account of the strategic,
operational and financial risks facing the Council and should consider both internal
and external factors.  There are 20 categories included in the risk analysis and 3
have been assessed as low, 4 low/medium, 6 medium and 7 medium/high.  The
medium/high risks are in respect of council wide cost risks, funding risks, inflation
rates, world events, general financial climate, Health and Social care partnership,
and the impact of climate change.   
Page 153 Agenda Item 2d

Page 154

ARGYLL AND BUTE COUNCIL COUNCIL
FINANCIAL SERVICES 25 FEBRUARY 2026
RESERVES AND BALANCES – UPDATED FOR BUDGET PACK 2026-27 
2. INTRODUCTION 
2.1 This report outlines current balances on all of the Council’s reserves, both
usable and unusable. It also provides detail on the monitoring of the earmarked
balances within the General Fund.   
3. DETAIL 
3.1 Types of Reserves 
3.1.1 Usable Reserves - Councils have powers to establish certain resource backed
reserves which can be used to fund expenditure.  The powers of councils to
establish reserves are laid out in Schedule 3 of the Local Government
(Scotland) Act 1975.  These allow councils to establish a Renewal and Repairs
Fund, Insurance Fund and Capital Fund. Councils can also establish a Useable
Capital Receipts Reserve.  The Council must also maintain a General Fund and
can earmark balances for specific purposes within the General Fund. 
3.1.2 Unusable Reserves – Councils are also required to establish certain reserves
that are not backed by resources. They are required purely for accounting
purposes and do not represent resources available for councils to utilise. The
Pensions Reserve, Revaluation Reserve, Capital Adjustment Account, Financial
Instruments Adjustment Account and Accumulated Absences Account fall into
this latter category of accounting reserves. 
3.2 Reserve Balances at 31 March 2025 
3.2.1 The balances on each type of reserve at 31 March 2025 are set out in the two
tables below, updated as per the Audited Accounts for 2024-25. 
Unusable Reserves £000
Revaluation Reserve 179,662
Capital Adjustment Account 255,558
Financial Instruments Adjustment Account (1,413)
Pensions Reserve (16,984)
Accumulated Absences Account (11,262)
Total Unusable Reserves 405,561 
Usable Reserves £000
Repairs and Renewals Fund 3,608
Capital Funds 3,358 
Capital Grants Unapplied 1,564
General Fund  112,705
Total Usable Reserves  121,235
Total Reserves  526,796 
Page 154

Page 155

3.2.2 The Revaluation Reserve represents the unrealised gains in the valuation of
fixed assets. The Capital Adjustment Account represents the difference
between depreciation based on proper accounting practice and statutory
charges for financing capital expenditure. The Financial Instruments Adjustment
Account represents the difference between gains and losses on borrowing and
statutory capital financing charges. The Pensions Reserve represents the
difference between pension costs based on proper accounting practice and
payments made for pension costs. The Accumulated Absences Account
represents the costed difference between holiday pay entitlement and actual
holidays taken at 31 March. 
3.2.3 The Repairs and Renewals Fund was established to support funding of renewal
and replacement of school equipment.  Schools can only draw on the Repairs
and Renewals Fund to the extent they have previously paid into the Fund and
contributions must be contained within schools devolved budgets. 
3.2.4 The Capital Fund was established to receive all capital receipts generated by
the Council including accumulated unspent capital receipts from sale of council
houses prior to transfer of the housing stock. This forms part of the Council’s
Strategic Housing Fund and can be used for investment in social housing in
accordance with the approach to investing in housing agreed by the Council in
August 2012. The Council decides as part of the budget process each year how
it wishes to draw the remaining funding from the Capital Fund which can be
used to support the capital plan or meet the principal repayments on loan
charges. 
3.2.5 When a capital grant has yet to be used to finance capital expenditure, it is
posted to the Capital Grants Unapplied Account where it is held until it has been
applied to fund capital expenditure. 
3.3 General Fund 
3.3.1 The General Fund balance at 31 March 2025 can be analysed as follows: 
Balance
31/03/25
£000
Balance on General Fund as at 31 March 2024 115,741
Decrease to General Fund balance at end of 2024-25 (3,036)
Earmarked Balances (105,162)
Contingency allowance at 2% of net expenditure (6,539)
Unallocated balance as at 31 March 2025 1,004 
3.3.2 The General Fund includes balances that the Council has agreed to earmark for
specific purposes. Some of these earmarked balances will be spent during the
current financial year and some of them will be held over and spent in later
years. The table below shows the balance at 31 March 2025, the new amounts
earmarked in relation to Strathclyde Pension Fund savings, reserves already
drawn down against spend, the movements between categories (see paragraph
3.3.3), the remaining balance at 31 December 2025 and finally any sums being
Page 155

Page 156

released to the general fund. Appendix 1 provides further details on the
breakdown of unspent budget earmarkings.  Officers have reviewed and
updated the spending profiles. 
3.3.3 A separate update report on the Review of Capital Arrangements has been
provided, as part of the Budget Pack.  It is anticipated that the Section 95
Officer will take a strategic and flexible approach to the use of reserves
earmarked for capital purposes, in order to manage the impact of capital
investment decisions on the annual revenue budget and to safeguard the
council’s longer term financial sustainability.  A review of earmarked reserves
has been undertaken to confirm those held for capital purposes.  In light of the
proposed approach, it is recommended that these reserves are consolidated
Earmarking
Category
Opening Balance New
Earmarkings in
Year
Drawn-down to
2025-26 Budget
as at 31
December 2025
Movement
between
categories
Remaining
Balance as at
31 December
2025
Released to
General
Fund / Tfr to
R&R Fund *
£ £ £ £ £ £
Strategic Housing
Fund 10,141,692 10,141,692
Investment in
Affordable
Housing
3,024,000 3,024,000 277,000
Capital Projects 37,493,675 2,000,000 (29,657) (39,523,332) 0
Strategic Capital
Finance Reserve 46,131,180 46,131,180 8,000,000
Lochgilphead and
Tarbert
Regeneration
288,579 288,579
Support for Rural
Growth Deal 441,690 (441,690) 0
Piers and
Harbours
Investment Fund
5,303,977 5,303,977
Scottish
Government
Initiatives
1,156,530 556,249 600,281
DMR Schools 1,205,590 1,205,590 0
Energy Efficiency
Fund 214,521 214,521 210,000
Unspent Grant 12,184,971 1,847,719 (767,905) 9,569,347 350,000
Unspent Third
Party Contribution 408,975 42,582 (26,592) 339,801
Previous Council
Decision - Other 4,274,925 257,764 (1,483,000) 2,534,161
Redundancy
Provision 2,659,358 480,000 2,179,358
Connect for
Success Fund 899,721 105,585 794,136
Fleet - Timing
Delay 483,661 (483,661) 0
Hermitage Park 56,383 56,383
Priorities
Investment Fund 1,426,800 138,550 1,288,250
Unspent Budget 14,294,911 7,053,000 2,636,026 (3,405,000) 15,306,885 390,242
SPF -
Transformation/sp
end to save
2,004,764 875,000 146,391 2,733,373
Severe weather
related cost
reserve
4,244,000 4,244,000
To balance 25/26
Budget 2,952,661 2,952,661 0
Totals 105,161,384 9,928,000 10,339,460 0 104,749,924 9,227,242
Page 156

Page 157

into a Strategic Capital Finance earmarked reserve, as reflected in the table
above.   
3.3.4 * The table at paragraph 3.3.2 above shows a release of £9.227m from
earmarking, as follows: 
 As part of the Review of Capital Arrangements, it is proposed that £8m of
the Strategic Capital Finance reserves are re-directed to a Corporate
Property Repairs and Renewals Fund, supporting a more corporate and
strategic approach to property maintenance, repairs and renewals from
2026-27. 
 Investment in Affordable Housing – this earmarked balance provides cash
backed reserves for the loans to registered social landlords.  It is estimated
that as at 31 March 2026, the balance on the remaining loans will be
£2.747m, therefore £0.277m can be released back to the general fund. 
 The savings proposals being presented to the Council as part of the budget
pack include proposals to release existing earmarkings of £0.950m to
balance the 2026-27 budget.  The release of these earmarkings is reflected
in the table above. 
3.4 Unallocated General Fund Balance 
3.4.1 The Council’s General Fund contingency is set at 2% of net expenditure for
2025-26 and amounts to £6.539m.  This contingency is held to provide a
working balance to help cushion the impact of uneven cash flows and cushion
the impact of unexpected events.  It is up to authorities to make their own
judgement on the level of reserves taking local circumstances into account, for
example, previous call on contingency and amount of unallocated reserves
held.  The contingency needs to be updated to reflect the updated budget for
2026-27.  The budgeted net expenditure based on the proposed budget
contained within the revenue budget overview report is £358.694m.  2% of this
balance amounts to £7.174m. There is currently a contingency of £6.539m,
therefore £0.635m will require to be moved from the unallocated General Fund
balance to supplement the current contingency. 
3.4.2 The revenue budget monitoring position as at 31 December 2025 is a forecast
overspend of £0.627m. This is due to a forecast net overspend across services,
totalling £0.927m, offset by a forecast over-recovery of Council Tax income,
estimated at £0.300m.  There is also a forecast overspend of £0.416m in
respect of Social Work services, however, the HSCP expect this to be managed
from within available HSCP reserves. 
3.4.3 At its meeting of 26 November 2025, Council approved an increase to the
current Standby Rate of pay to £130 per week from December 2025, at a cost
of £0.013m in 2025-26, to be funded from the unallocated General Fund
balance.  The full year recurring implications of this approval from 2026-27
(£0.038m) is reflected within the current Budget Outlook. 
Page 157

Page 158

3.4.4 At Policy and Resources Committee on 4 December 2025, it was agreed that
financial support be provided to the Royal National MOD, to be funded from the
unallocated General Fund balance.  This totals up to a maximum of £225k (up
to £200k An Comunn + £25k LiveArgyll) over 4 years from 2025-26. 
3.4.5 An in-depth review of the Loans Fund undertaken by Financial Services has
estimated an underspend of £2.2m in 2025-26 due to a number of factors
including slippage within the capital programme resulting in a delay in the need
to borrow and new borrowing secured at lower interest rates than the existing
debt portfolio average.  £1.5m of this underspend has been put forward as a
saving towards the 2026-27 budget leaving £0.700m as an underspend in
2025-26. 
3.4.6  The table below summarises the position of the unallocated General Fund
balance taking into consideration the points noted above.  The estimated
unallocated General Fund at the end of the financial year is a surplus of
£0.481m.     
Heading Detail £000
Unallocated General Fund
as at 31 March 2025
This is the balance that is
unallocated over and above the 2%
contingency, which amounts to
£6.539m
1,004
Earmarked balances
released to general fund
and available for use
See para 3.3.4 – earmarking
released in relation to reduction in
loans for affordable housing.  
227
Transfer of contingency to
maintain 2% level
Per paragraph 3.4.1 (635)
Current Forecast Outturn
for 2025-26 as at 31
December 2025
Per paragraph 3.4.2 (627)
Standby Rate Increase –
2025-26 Cost
Per paragraph 3.4.3 (13)
Royal National Mod Per paragraph 3.4.4 (225)
Forecast Underspend on
Loans Fund 
Per paragraph 3.4.5 700
Estimated Unallocated
balance as at 31 March
2026 
481 
3.5 Review and risk Assessments 
3.5.1 Assessing the adequacy of reserves should take account of the strategic,
operational and financial risks facing the Council and should consider both
internal and external factors.  Appendix 2 to this report identifies the range of
issues in terms of budget assumptions and financial standing and management
that should be considered in assessing the level of reserves.  It relates only to
consideration of the contingency to be held in the General Fund balance.  A
separate financial risk analysis report has been prepared looking at the overall
financial risks relating to revenue and capital. 
Page 158

Page 159

3.5.2 There are 20 categories included in the risk analysis and 3 have been assessed
as low, 4 low/medium, 6 medium and 7 medium/high.  The medium/high risks
are in respect of council wide cost risks, funding risks, inflation rates, world
events, general financial climate, Health and Social care partnership, and the
impact of climate change.   
3.5.3 Based on the risk analysis in Appendix 2 and also taking cognisance of the
financial risks classed as “likely” in the financial risks report it is recommended
that the contingency for the General Fund balance should be retained at 2%.   
4. CONCLUSION 
4.1 The report outlines the overall reserves and balances for the Council covering
the purpose and level of each reserve.  It also provides detail as to expenditure
against earmarked balances held within the General Fund.  There is currently
an estimated surplus over contingency of £0.481m after adjusting for the
forecast outturn for 2025-26. 
5. IMPLICATIONS 
5.1 Policy  Earmarked funds are set aside for specific priorities and
where appropriate policy will be considered.  
5.2 Financial   Outlines the balances held with the Council’s usable and
unusable reserves.     
5.3 Legal   None specifically from this report.
5.4 HR  None specifically from this report.
5.5 Customer Service   None specifically from this report.
5.6 Risk   A contingency of £7.174m (equivalent to 2% of net
expenditure) has been set aside as part of the general
fund.  This has been subject to a risk assessment. 
5.7 Climate Change None specifically from this report.
5.8 Fairer Scotland Duty None specifically from this report.
5.9 Equalities (protected
characteristics)
None specifically from this report.
5.10 Consumer Duty None specifically from this report.
5.11 Island Communities None specifically from this report.
5.12 Children’s Rights
and Wellbeing
None specifically from this report. 
Kirsty Flanagan
Executive Director/Section 95 Officer 
11 February 2026 
Councillor Ross Moreland, Policy Lead for Finance and Commercial Services 
APPENDICES
Appendix 1 – Earmarked Reserves breakdown of unspent budget as at 31 December
2025
Appendix 2 – Risk Assessment for Review of Reserves 
Page 159

Page 160

For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk
Page 160

Page 161

Appendix 1
Earmarked Reserves - Unspent Budget
As at 31 December 2025
Ref Department Service Description Opening
Balance
New
earmarkings in
year
Budget
Drawdown
Movement
between
categories
Released back
to General
Fund
Remaining
Balance
Plans for Use Amount
Planned to
be Spent in
2025-26
Amount
Planned to
be Spent in
2026-27
Amount
Planned to
be Spent
from
2027/28
onwards
001 Chief Executive's Unit Community
Planning
Service Concessions - Priorities
Investment Fund (Area Plans)
108,793 88,115 20,678 As agreed by Policy and Resources Committee on 23 October 23 - drawdown of £200,000 from the
Priorities Investment Fund to fund two temporary posts and associated costs to produce
meaningful area plans
79,846 28,947
009 Executive Director (Douglas Hendry) Across Services /
Education
Digital Projects (Supply Staff
Booking System)
5,300 5,300 0 To deliver a number of Digital Service Transformation Projects with a commitment of £0.035m
towards a Supply Staff Booking system.  Phase 1 of the project is nearing completion.
5,300 0
010 Executive Director (Douglas Hendry) Commercial
Services
Rothesay Pavilion Charity 1,159,204 0 1,159,204 Agreed at Council meeting February 2020,Unspent Budget Earmarking 010 of £750k additional
revenue support subject to conditions which seek to minimise the risk to the Council as far as is
reasonably practicable including requirement for adequate business and financial management and
regular reporting by RPC.  This funding is to support Rothesay Pavilion Charity in the first 2 years of
the building being operational.  Merged September 24 per Council decision with CHORD earmarking
094 £409k which was about building up a provision towards future Council commitment to provide
up to £150,000 per annum running costs for Rothesay Pavilion.
Additional revenue support subject to conditions which seek to minimise the risk to the Council as
far as is reasonably practicable including requirement for adequate business and financial
management and regular reporting by RPC.
0 0 1,159,204
014 Executive Director (Douglas Hendry) Commercial
Services
Commercial Investment Manager
post and specialist consultant
technical resource (previously
Asset Management Fund)
79,242 0 79,242 0 The Asset Management Fund has been redirected to Capital going forward but the interest for 2023-
24 is to be used towards a Commercial Investment Manager Post.  This is because funding of £200k
from the Asset Management Fund was agreed at ELT in June 22 for the post, along with specialist
consultancy and technical resources  that will be required to support early projects.  The post is
now vacant and the funds are being put forward as a saving (COM09) to balance 2026-27 budget.
0 0
015 Executive Director (Douglas Hendry) Commercial
Services
Estates - NDR Revaluation Appeals 59,938 0 59,938 The Council agreed to make provision to meet the cost of appealing Non Domestic Rates (NDR)
revaluations which were imposed from April 2017. The remaining funds were carried forward to
the 2023/24 revaluation cycle however a recent change in position by the Scottish Government may
restrict the appeals which can be made. This is still under discussion and Gerald Eve Surveyors have
been appointed as specialist advisers on this matter, who are progressing 2023-26 appeals. In the
event that appeals are limited there may be an opportunity to utilise Gerald Eve for more general
valuation advice subject to Procurement approval.
50,000 9,938
018 Executive Director (Douglas Hendry) Commercial
Services
Site Investigation Works 33,710 0 21,000 12,710 For Site Investigation works and pre-development works exploring and developing commercial
opportunities across Argyll and Bute.
Having a procured supplier to provide floor plans at short notice is required to be able to react
quickly to requests. If this isn't available Estates would need to go through the procurement
process again which would delay any projects by several months. There isn’t a detailed plan to use
this resource it is more about being able to react quickly and not delay projects.  For 2026-27
budget, £21k is being put forward as a saving (COM10).
0 12,710
021 Executive Director (Douglas Hendry) Education ASN Review 967,574 0 (967,574) 0 Transferred from Education to fund ASN review upgrades in Islay High School, Castlehill Primary
School, Tobermory High School and Hermitage Academy
0 0 0
036 Executive Director (Douglas Hendry) Education MCR Pathways Pilot 80,000 0 80,000 0 Funding to support implementation of MCR Pathways mentoring programme within three
secondary schools for 2025-26 academic year. Funding will allow the employment of a dedicated Co-
ordinator within each setting to develop and implement the programme which is designed to
benefit care experienced and other disadvantaged pupils through targeted mentoring support.  For
2026-27 budget, the balance is being put forward as a saving (EDU07).
0 0 0
042 Executive Director (Douglas Hendry) Education Gaelic Specific Grant 30,000 30,000 0 Gaelic Specific Grant £30k - This earmarking refers to the Council contribution towards the Gaelic
grant for 22-23 and will fund the costs of Gaelic Language Principal Teacher in 25-26 academic year.
30,000 0
043 Executive Director (Douglas Hendry) Education (2023 Digital Projects) Cashless
Catering
5,004 0 5,004 To support the ongoing implementation of the new cashless catering system during the testing and
roll out phase.
£20k released back to General Fund September 24 per Council decision as no longer required.
0 5,004
059 Executive Director (Douglas Hendry) Legal and
Regulatory Support
Education Purchasing Officers 210,000 0 210,000 0 The earmarked funds will be used to fund an education purchasing team within the Procurement
Service for two years.  The team will embed good procurement practice, train headteachers on
current procurement process requirements, develop spend plans that evidence best value.  For
2026-27 budget, the balance is being put forward as a saving (LRS02).
0 0 0
061 Executive Director (Douglas Hendry) Legal and
Regulatory Support
Information Management
(Digitalisation of Title Deeds)
92,000 0 92,000 To support a number of initiatives in respect of improving the Council's information management in
line with the transformation agenda and increasing the pace of change as outlined in the BV
Review.  The planned initiatives include: Digitalisation of Title Deeds £92k - document
management. Staffing now in place for this project to be completed.
0 92,000
Page 161

Page 162

Ref Department Service Description Opening
Balance
New
earmarkings in
year
Budget
Drawdown
Movement
between
categories
Released back
to General
Fund
Remaining
Balance
Plans for Use Amount
Planned to
be Spent in
2025-26
Amount
Planned to
be Spent in
2026-27
Amount
Planned to
be Spent
from
2027/28
onwards
063 Executive Director (Douglas Hendry) Legal and
Regulatory Support
(2023 Digital Projects)
Replacement of Council Chambers
Online Meeting Equipment
44,718 7,219 37,499 Current online meeting system is less than resilient and has failed on a number of occasions,
leading to issues at strategic committees. A condition assessment by the incumbent maintenance
contractor has highlighted that the current equipment is now at end of life and unsupportable due
to the  obsolescence of the system. Discussions with ICT have taken place to identify a simpler more
robust solution to be procured.
NUWAY system and maintenance, system installed, ongoing maintenance contract to 2030
7,219 7,219 30,280
064 Executive Director (Douglas Hendry) Legal and
Regulatory Support
Councillor IT Equipment 44,557 22,000 22,557 There is currently no budget for the provision and renewal of IT equipment for members. The
earmarking identifies a resource to utilise spend for that purpose to ensure that members have
continued support in maintaining and replacing vital IT equipment.
22,000 22,557 0
066 Executive Director (Douglas Hendry) Legal and
Regulatory Support
Debt Counselling & Welfare Rights 735 735 0 To meet the cost of a Debt Counselling and Welfare Rights Management System.
Balance of £15k released back to General Fund per Council decision September 24 and an
associated cost pressure built in to 2025-26 budget cover the routine annual costs.
735 0 0
068 Executive Director (Kirsty Flanagan) Across Services /
Customer Support
Services
Digital Projects (Increase in Schools
Bandwidth)
63,455 0 63,455 To complete one of a number of Digital Service Transformation projects with a commitment of
£0.064m to increase Schools Bandwidth.  Committed for MS 365 project - D Logan/I Jackson. Paper
went to ELT in Dec 24.
0 63,455
069 Executive Director (Kirsty Flanagan) Across Services /
Customer Support
Services
Digital Projects (Replacement
Learning Management System)
11,470 0 11,470 To deliver a number of Digital Service Transformation Projects with an original commitment of
£0.030m towards a replacement Learning Management System £0.030m.  This money will be used
to pay for consultancy for an interface between iTrent and totara. Profiled for 24/25 based on
decision to do a phased implementation of itrent. Update:  Due to sickness in a key project role and
other factors including prioritising resource for itrent, our HROD project is now behind schedule
and will not complete by the planned date of March 2026.  The HROD Digital project will need to be
extended into the next financial year and will involve profiling the digital earmarking’s beyond April
2026. It is intended that the project will be completed, and all earmarking’s drawn down by the end
of September 2026.
0 11,470
070 Executive Director (Kirsty Flanagan) Across Services /
Development and
Economic Growth
Information Management
(Document Management and
Workflow for Planning, Building
Standards and Environmental
Health)
21,177 0 21,177 Hoping to implement the replacement for IDOX in March 2024 but there have been severe
issues/delays with the new programme . 
Dec 24 Project has been scrapped as it was not working. Awaiting procurement to write
termination of contract legal documents, until this is completed we will not know if any further cost
are due.
Amount moved to 2026-27
0 21,177
075 Executive Director (Kirsty Flanagan) Customer Support
Services
Growing our Own and Modern
Apprentices
69,150 29,157 39,993 Funding earmarked to support trainee development and modern apprenticeship opportunities
based on priority workforce risk areas.  A Trainee Regulatory Services post has been proposed by
the manager who was unable to secure a suitable candidate for the original advert. The spend will
be in 25/26 once a suitable candidate is in post. Post interviewed for, awaiting references. 
Successful candidate unlikely to start before April 25.
Balance of £40k released back to General Fund per Council decision September 24 as only £69k is
still required for the intended purpose.
29,157 39,993
076 Executive Director (Kirsty Flanagan) Customer Support
Services
Security Operations Centre
Subscription
71,188 42,406 28,782 There is a requirement to pay for a 3-year subscription at £60,000 per annum with a cost pressure
being added to the ICT revenue budget to cover the costs from 2026-27 onwards.  Sept 25 update -
Invoice for year 3 for Quorum Cyber Security is 42,405.87.  28,782 will be used in 26-27 towards
next year's expected cost 42,406 plus inflation.
42,406 28,782
077 Executive Director (Kirsty Flanagan) Customer Support
Services
(2023 Digital Projects) Resilient
Website Project
46,000 29,500 16,500 Cybersecurity action to move to a cloud based website platform that would improve resilience and
enable service continuity in the event of a cyber attack.  Procurement in progress for resilient
website solution and Scotgov Cloud Services Project providing input. Contract Award expected by
end 2023. Procurement in progress for resilient website solution.   Contract Award expected FQ1
2024-5.  3 year contract has been awarded to BigBlueDoor.  14k spend 24/25, 29.5k in 25/26 and
16.5k in 26/27.
29,500 16,500
078 Executive Director (Kirsty Flanagan) Customer Support
Services
(2023 Digital Projects) Digital
Project Officer
34,121 0 34,121 Employ a temporary Digital Project Officer as part of OD changes - additional member of staff
required to action changes, unable to recruit so existing staff increasing hours. Update:  Due to
sickness in a key project role and other factors including prioritising resource for itrent, our HROD
project is now behind schedule and will not complete by the planned date of March 2026.  The
HROD Digital project will need to be extended into the next financial year and will involve profiling
the digital earmarking’s beyond April 2026. It is intended that the project will be completed, and all
earmarking’s drawn down by the end of September 2026.
0 34,121
079 Executive Director (Kirsty Flanagan) Customer Support
Services
Implementation of Gaelic
Language Plan
30,000 0 30,000 Agreed at Council Meeting February 2021.  Provision of funding for delivery and implementation of
the council’s Gaelic Language Plan in recognition of the contribution that Gaelic makes to economic
growth and to the tourism sector, and to enable delivery of key activities within the plan which
currently receive no revenue funding.  In discussion with Bord na Gaidhlig about a 3-year Gaelic
Plan funding programme as opposed to individual grant applications for specific projects. This
earmarking would be used to provide match funding for that 3 year programme of projects.  3 year
match funding approved December 2024.
Sept 2025 confirmed no spending in 25-26, moved on one year
0 30,000
Page 162

Page 163

Ref Department Service Description Opening
Balance
New
earmarkings in
year
Budget
Drawdown
Movement
between
categories
Released back
to General
Fund
Remaining
Balance
Plans for Use Amount
Planned to
be Spent in
2025-26
Amount
Planned to
be Spent in
2026-27
Amount
Planned to
be Spent
from
2027/28
onwards
080 Executive Director (Kirsty Flanagan) Customer Support
Services
Business Development Training 11,214 11,214 0 £27k budget from original Business Development Training earmarking 080 remaining at 31/03/24. 
This budget is funding ongoing leadership development, coaching, action learning sets and
commissioned training including Priority Management.
Agreed by Council September 24 to merge with 24-25 EMR 082 - In order to maximise the
opportunities and efficiencies of digital learning, this funding will be used to support the extension
of digital learning in order to deliver the Digital Learning Strategy, which was approved in FQ4
20/21. This money is to support the additional digital learning capacity required to build online
elements of AB365 and other key digital learning as we increase our digital learning offering linked
to the digital skills survey and review of corporate training.
11,214 0
105 Executive Director (Kirsty Flanagan) Development &
Economic Growth
Service Concessions - Priorities
Investment Fund (Project Officer
for Housing Emergency)
200,000 64,329 135,671 As agreed by Policy and Resources Committee on 15 February 2024 - drawdown of £200,000 from
the Priorities Investment Fund to fund a Project Officer to assist in accelerating the work of the
Housing Emergency.
65,000 135,000
107 Executive Director (Kirsty Flanagan) Development &
Economic Growth
Strategic Events & Festivals 1,460 0 1,460 At the Council meeting on 25 February 21, a decision was taken to agree £90k funding for Events
and Festivals for 22/23, in order that the application process can commence during 21/22 and that
this agreed figure be augmented by any underspend remaining from the 20/21 financial year.  At 24
February 22, decision made to agree £90k for 23/24, in order that the application process can
commence during 22/23 and that this agreed figure be augmented by any underspend remaining
from the 21/22 financial year.  Applications have been received and payments will be made in 23-
24. Final balance (£41,260) to be spent in 24/25
remaining balance £1460 to be spent in 25/26
1,460 0
112 Executive Director (Kirsty Flanagan) Development &
Economic Growth
Screen Machine 5,000 5,000 0 At the Council Budget meeting on 22 February 2024, the Council committed to a one-off investment
of £0.028m to Screen Machine in response to an external funding request.
Dec 24  Grant offer has now been sent out but payment now not due until Q1 25/26
5,000 0
124 Executive Director (Kirsty Flanagan) Financial Services Revenue and Benefits BPR  - extra
staff to implement savings targets
86,955 0 86,955 On 23 February 2023, the Council agreed to the implementation of savings option FIS2324-002 in
relation to the Revenue and Benefits - Income Generation and Business Process Review.   This
included an extra 4 FTE of staff.  Delays in recruitment have caused slippage in the allocated budget
for these posts.  Consultancy costs in relation to the BPR review of Income Max and Care Financial
Assessments committed from here (£15k).
0 86,955
129 Executive Director (Kirsty Flanagan) Financial Services Financial Systems 33,748 0 33,748 The council is required to implement the IFRS16 Leases accounting standard  from the 1st April
2024.
33,748 0
130 Executive Director (Kirsty Flanagan) Financial Services Accounting and Budgeting Team
Resilience
36,055 5,284 30,771 Training and examination fees for 6 staff who are currently undertaking their professional
CIPFA/ACCA training.  In addition funding the further training of 1 of our auditors and providing
finance business partner training to a group of our existing professional staff.
8,000 28,055
134 Executive Director (Kirsty Flanagan) Roads and
Infrastructure
Services
Waste Variation Monies 1,000,043 215,512 3,500,000 4,284,531 Waste Variation Monies remaining of  - £1m, to be used to assist with the Council's compliance with
the 2026 ban on the Landfill of Biodegradable Municipal Waste and supporting the overall Waste
Strategy)
£886K in 2025-26  consisting of:- Island restoration/capping, waste PPP conversion of sites
(including consultants for waste PPP MBT conversion monitoring and sign off), consultancy costs
relating to additional monitoring data for SEPA and Recycling Improve Fund design works.
£113K in 2026-27 consisting of:-  consultancy costs relating to additional monitoring data for SEPA
and island restoration/capping.
886,643 113,400 3,500,000
138 Executive Director (Kirsty Flanagan) Roads and
Infrastructure
Services
Service Concessions - Priorities
Investment Fund (Strategic
Development Framework)
433,804 72,035 361,769 As agreed by Policy and Resources Committee on 15 February 2024 - drawdown of £450,000 to
procure consultancy support to assist in driving forward the Strategic Development Frameworks.
433,804 0
141 Executive Director (Kirsty Flanagan) Roads and
Infrastructure
Services
3G pitches / Tarbert Sports Pitches 213,769 0 213,769 In November 2018, the Council agreed to a maintenance funding package to be progressed for a
number of 3G pitches including Tarbert. This funding was proposed to provide an estimated 6.5
years’ worth of ongoing maintenance up to 2025-26. There is the potential to extend the continued
upkeep of the pitches until 2026-27 given the earmarking available will not be fully utilised by the
end of 2025-26.  However, there will be potential redundancy costs for 1 employee that will need to
be covered from the remaining balance. Paper on proposed extension to be prepared.
Sept update - Note comment earmark may not be fully utilised
96,072 117,697
146 Executive Director (Kirsty Flanagan) Roads and
Infrastructure
Services
Climate Change 40,942 0 40,942 At the Council meeting on 27 February 2020, it was agreed to input £500k budget to mitigate the
impacts of weather related damage and climate change with specific emphasis on gully cleaning
and drainage improvements.  Spend has been delayed due to COVID and the intention is to spend
the funds on 2 Gully Motors plus staff over next 2 years. Vehicles have been received and budget
will be drawn down to cover their cost. The remaining budget will be used towards running the
vehicles. Sept 25 exercise moved on 1 year
40,942
151 Executive Director (Kirsty Flanagan) Roads and
Infrastructure
Services
Weather Incident costs not
covered by Bellwin claim.
198,000 0 198,000 £839k was set aside at budget meeting in February 2024 as part of the unallocated general fund
balance workings to cover the weather incident costs not covered by the Bellwin Claim.  As £641k
was utilised during 23-24, the balance of £0.198m is being earmarked for costs unexpected weather
events in the future.
0 198,000
154 Non Departmental Non Departmental Service Concessions - Replace
previous loans fund principal
repayment holiday
5,400,000 0 (5,400,000) 0 As agreed at Council meeting 23 February 2023 - The one-off retrospective benefit will be used to
replace exercising the principal repayment holiday that was previously agreed by Council.
0 0 0
Page 163

Page 164

Ref Department Service Description Opening
Balance
New
earmarkings in
year
Budget
Drawdown
Movement
between
categories
Released back
to General
Fund
Remaining
Balance
Plans for Use Amount
Planned to
be Spent in
2025-26
Amount
Planned to
be Spent in
2026-27
Amount
Planned to
be Spent
from
2027/28
onwards
164 Non Departmental Non Departmental Pay Inflation Contingency 1,297,550 0 1,297,550 Contingency built in to cover pay increases beyond budget.  In 2025-26, £0.039m to be used to
cover in-year impact of Chief Officers pay award and the balance to offset impact of 2026-27 pay
award.
39,000 1,258,550
171 Non Departmental Non Departmental Oban TIF (Tax Incremental
Financing - Excess NDR)
875,651 0 875,651 This is the surplus NDR after paying all Loans Charges in respect of TIF infrastructure projects.  This
fund will be used in the future as TIF projects are delivered.   Discussions in place on future ff the
next TIF project (Oban Airport) which will utilise this reserve.  If the project does not go ahead, we
will need to return NDR to Scottish Government
0 875,651
184 Non Departmental Non Departmental Information Management (Balance
of Funding)
200,469 0 200,469 To support a number of initiatives in respect of improving the Council's information management in
line with the transformation agenda and increasing the pace of change as outlined in the BV
Review.  This was the balance of funding to explore information management solutions in a
strategic and coherent way £209k.  Committed for MS 365 project - D Logan/I Jackson. Paper went
to DMT in Dec.
0 0 200,469
186 Non Departmental Non Departmental Engagement with Hub North re
provision of services for older
adults and vulnerable people
across Argyll and Bute
95,005 0 95,005 At the Council budget meeting February 23, an allocation of £0.1m from the Unallocated General
Fund balance for the Health and Social Care Partnership to engage, in partnership with the Council,
with Hub North to develop a strategic business case in relation to the provision of services for older
adults and other vulnerable people across Argyll and Bute.  It is intended that this will be spent on
an on-going business case and options appraisal work with Hub and it will be fully utilised in 2025-
26.
95,005 0
187 Non Departmental Non Departmental Spend to Save Route Optimisation
Software
55,484 3,220 52,264 One-off re-profiling gain as a result of the loans fund review to fund known liabilities/cost pressures
as agreed at budget setting meeting in February 2020.  The route optimisation project has been
delayed due to staff turnover and absences, recent meetings involving the Council and Routeware
have set out future objectives and the project has been extended to 2025-26. Further delays
anticipated due to our GIS system and Routeware system compatibility issues.
3,220 52,264
188 Non Departmental Non Departmental CHARTS 5,000 5,000 0 At the Council Budget meeting on 22 February 2024, the Council committed to £0.075m one-off
investment in CHARTS in response to an external funding request will be spent in 24-25. There
remains £0.005m from a COVID earmarking for CHARTS as well.
0 5,000
198 Executive Director (Douglas Hendry) Education ASN Review Upgrades - Capital 287,426 0 (287,426) 0 Transferred from Education to fund ASN review upgrades in Islay High School, Castlehill Primary
School, Tobermory High School and Hermitage Academy
0 0 0
200 Executive Director (Kirsty Flanagan) Roads and
Infrastructure
Services
Gartbreck Cell - Capital 250,000 0 (250,000) 0 £250k transferred from Waste Variation ER 134 to fund capital cost relating to Gartbreck Cell 0 0 0
204 Executive Director (Kirsty Flanagan) Development &
Economic Growth
Planning Services 300,000 0 300,000 Depending on the outcome of a number of S36 Windfarm planning applications, this earmarking
will be used to cover consultation advice and a potential public inquiry if applications are refused.
150,000 150,000 0
223 Non Departmental Non Departmental Strathclyde Pension Fund Saving 25-
26 - Planned Allocation to 2025-26
2,000,000 2,000,000 0 £2m allocation from 2025-26 SPFO saving to be allocated to balance the 2025-26 budget. 2,000,000
224 Non Departmental Non Departmental Strathclyde Pension Fund Saving 25-
26 - Planned Allocation to 2026-27
2,000,000 2,000,000 £2m allocation from 2025-26 SPFO saving to be allocated to balance the 2026-27 budget. 2,000,000
225a Non Departmental Non Departmental Social Work Strathclyde Pension
Fund Saving 25-26
2,553,000 2,553,000 This is part of the revenue budget for 25-26 and is the saving on Social Work pension budgets
resulting from the drop in employers pension rate. Total of £3.053m but £500k split out for
transformation projects per Council decision Feb 25.
2,553,000
225b Non Departmental Non Departmental Social Work Strathclyde Pension
Fund Saving 25-26 (Per Motion Feb
25, £500k for transformation)
500,000 500,000 This is part of the revenue budget for 25-26 and is the saving on Social Work pension budgets
resulting from the drop in employers pension rate.  Agreed at Council February 25 to set aside
£500k for transformation projects.
500,000
14,294,911 7,053,000 2,636,026 (3,405,000) 390,242 14,916,643 6,677,329 5,985,387 4,889,953
Page 164

Page 165

APPENDIX 2   
Risk Assessment for Review of Reserves
Risk Category Comment Assessment
Cost and Demand
Pressures
As part of maintaining the medium term budgetary outlook, cost and
demand pressures for 2026-27 and beyond have been kept under review. 
The cost and demand pressures for 2026-27 amount to £4.496m for
Council services.  A general allowance for unidentified cost and demand
pressures has been built into the budget outlook for 2027-28 and future
years:  £0.250m in the best case scenario, £0.500m per annum in the mid-
range, and £1m per annum in the worst case scenario. 
Medium
(2025-26 Medium)
Service Income Service income levels have been reviewed as part of constructing the
budget. In addition fees and charges have been reviewed. 
Medium
(2025-26 Medium) 
Council Wide Cost
Risks
The financial risk analysis identified 6 council wide cost risks currently
amounting to £7.1m as follows: 
Description  Likelihood
Assessed
Financial
Impact
£m
Unbudgeted Severe Weather costs 4 3.0
Energy costs increase by 5% greater than
budgeted
3 0.4
IJB refer to Council for additional funding to
deliver social work services 
3 2.0
1% variation in Council Tax Income 2 0.8
10% shortfall on Savings delivery 2 0.6
Medium/High
(2025-26 Medium/High) 
Page 165

Page 166

Risk Assessment for Review of Reserves
Risk Category Comment Assessment
10% variation on General Inflation 3 0.3
Total     7.1 
Funding Risks The Scottish Budget was announced on 13 January 2026 included
additional funding that was uncommitted.  The like for like cash increase
was Although there has been a cash increase was £6.059m (2.3%),
however, after accounting for settlement commitments this reduces to
£2.485m (0.9%).  The Scottish Spending Review published alongside the
Scottish Budget suggests limited real-terms growth, effectively a very tight
or flat cash outlook for the Finance and Local Government portfolio.  It is
expected that detailed estimates at Local Authority level will be available in
the Spring.  The mid-range scenario includes a 0.5% decrease in funding
for future years, reflecting the fact that we rely on the floor mechanism
which is currently set at 0.5% below the average change in funding
therefore the budget outlook assumes flat cash in future years. 
There is a proposed increase to Council Tax of 6% to balance the budget. 
Collection rates remain good at circa 96%. 
It would be prudent for this risk to remain at Medium/High. 
Medium/High
(2025-26 Medium/High) 
Savings Risks The 2026-27 budget includes new Operational/Management and Policy
savings options, totalling £6.090m.  Whilst the council has a good track
record in delivering savings, there is a risk that this target will not be fully
delivered.  Risk remains at medium. 
Medium
(2025-26 Medium) 
Page 166

Page 167

Risk Assessment for Review of Reserves
Risk Category Comment Assessment
Inflation Rates CPI Inflation was 3.4% in December 2025, compared to 3.2% in November
2025, the first increase in the rate for several months. The latest Bank of
England forecast for CPI inflation suggests that the rate will reduce during
2026/27 however this is uncertain and not consistent with the increase in
the December 2025 rate. 
Given the ongoing challenges facing the UK economy, including potential
disruption due to the developing situation between the United States of
America and Europe in relation to Greenland, it would be prudent to
consider the risk that inflation will be higher than forecast and a Council
wide risk has been identified of £0.300m. For 2025-26, despite the overall
rate of inflation being forecast to be relatively stable over the year, officers
expect that inflationary pressures will continue to be a point of financial
pressure throughout the year and Finance staff will work in conjunction with
Services to monitor the situation very closely. 
Medium/High
(2025-26 Medium/High) 
Interest Rates The council’s debt portfolio is largely long term borrowing for capital
purposes at fixed interest rates, with a mixed maturity profile, minimising
exposure to interest rate risk in terms of interest rate volatility, over future
years.  The council holds both short term or temporary borrowing and
investment balances to manage day to day cashflow requirements.     
The treasury position is actively managed to reduce debt interest costs and
maximise the return on investments, commensurate with the council’s risk
appetite and within the limits of the approved Treasury Management and
Annual Investment Strategies.  Further, the council continues to hold
significant reserve balances, which has allowed the deferral of new external
borrowing, in favour of internal borrowing.  This is a prudent strategy, where
interest rates are forecast to fall across future years, which both provides an
Low
(2025-26 Low) 
Page 167

Page 168

Risk Assessment for Review of Reserves
Risk Category Comment Assessment
opportunity for longer term interest cost savings and minimises investment
risk.  The council continues to monitor interest rate markets and forecasts
and undertakes borrowing and investment decisions based on advice from
its treasury advisors, MUFG (formerly Link). 
Investment risks The authority will aim to achieve the optimum return (yield) on its investments,
commensurate with proper levels of security and liquidity.  The risk appetite
of the council is low, prioritising security and liquidity.  In the current economic
climate, it is considered appropriate to keep investments short term to cover
cash flow needs.  Investments are placed with high credit quality financial
institutions, using the MUFG suggested creditworthiness approach, including
a minimum sovereign credit rating and Credit Default Swap (CDS) overlay
information.   
As outlined above, the level of internal reserve fund balances has provided
an opportunity to defer new external borrowing, whilst also minimising
exposure to investment risk. 
Low
(2025-26 Low) 
Strategic risks The strategic risk register is subject to a formal review by Executive
Leadership Team (ELT) bi-annually, and these reviews have already taken
place in April and October of 2025.   ELT have agreed the current actions to
address the risks. 
Medium
(2025-26 Medium)
Operational risks Operational risks are reviewed formally each quarter by the Senior
Leadership Team.  Any operational risks that are identified as high are
reported to the Executive Leadership Team as part of the bi-annual review
of the Strategic Risk Register.  
Medium
(2025-26 Medium)
Page 168

Page 169

Risk Assessment for Review of Reserves
Risk Category Comment Assessment
World Events World events are likely to continue to affect the global economy (Russian
invasion of Ukraine, United States of America action in Venezuela and their
intentions towards Greenland) causing market and price instability through,
for example, tariffs and disruptions to supply chains which lead to delays
and reducing the availability of goods and services which increases prices. 
Medium/High 
(2025-26 Medium/High)
General financial
climate
The Scottish Budget included multi-year spending plans, however, the
Circular only gives details of the provisional Local Government settlement
(revenue and capital) at Council level for 2026-27 only.  It is expected that
information at Council level for 2027-28 and 2028-29 will be available
around the Spring.  The Scottish Spending Review published alongside the
Scottish Budget suggests limited real-terms growth, effectively a very tight
or flat cash outlook for the Finance and Local Government portfolio.  
A prudent approach to estimating income from council tax has been taken.
Risks arising from inflation, interest rates, cost pressures and demand led
pressures have been outlined above. 
Due to ongoing uncertainties regarding the level of funding from Scottish
Government, the risks to the UK economy and the sensitivity of interest
rates to world events, it would be prudent to retain this risk at medium/high. 
Medium/High
(2025-26 Medium/High) 
Availability of
contingency funds
The Council currently has sufficient contingency funds to meet its target.    Low/Medium
(2025-26 Low/Medium)
Overall financial
standing 
The Council has managed to achieve its contingency target in previous
years. Actual costs are normally contained within budget.  Borrowing costs
are largely fixed at the moment, as the Council’s need to borrow is currently
low due to the high levels of funds it is holding. In addition to the
contingency there are significant earmarked funds. Cost and demand
pressures are identified and provided for if necessary and the impacts of
Low/Medium
(2025-26 Low/Medium) 
Page 169

Page 170

Risk Assessment for Review of Reserves
Risk Category Comment Assessment
inflationary changes are continually monitored and adjusted for in the
Council’s financial forecasts. 
Track record in
budget management
The Council has a good track record of containing expenditure within
budget, however, this year as at the end of December 2025 the Council is
forecasting an overspend due to some unforeseen costs.  Following a
review of the loans funds, a further forecast underspend of £0.700m has
been identified.  The outturn is of course still subject to change as there are
still 3 months of the financial year left and additional costs associated with
weather incidents can have a considerable impact on budgets.   As a result
this risk remains at Medium.   
Medium
(2025-26 Medium) 
Financial information
and reporting
arrangements
Revenue and capital budgets are monitored on a monthly basis with budget
allocated to responsible managers. A risk-based approach is taken to
budget monitoring and the budget monitoring process is continually being
reviewed to identify ongoing improvements. 
Low/Medium
(2025-26 Low/Medium) 
Insurance cover The Council has adequate insurance cover. Low
(2025-26 Low) 
Internal controls The statement of internal controls identifies a generally adequate control
framework although there are areas for improvement. An audit plan is
approved and delivered each year to monitor internal controls. The
Council’s Audit and Scrutiny Committee continues to actively develop and
adopt good practice. 
Low/Medium
(2025-26 Low/Medium) 
Page 170

Page 171

Risk Assessment for Review of Reserves
Risk Category Comment Assessment
Health and Social
Care Partnership
Financial Position
It is prudent to have a factor in terms of the Health and Social Care
Partnership financial position.  It is the responsibility of the Chief Officer and
Chief Financial Officer to manage the HSCP financial position.  If an
overspend is forecast, a budget recovery plan will be prepared and
submitted to the IJB, the Council and NHS Highland.  Where recovery plans
are unsuccessful and an overspend occurs at the financial year end, and
there are insufficient reserves to meet the overspend, then the partners will
be required to make additional payments to the HSCP.  The Council would
have to contribute towards any overspend related to Social Work.  Whilst
any additional payments by the Council and NHS Highland will be deducted
from future years funding, there is still a financial risk that the Council may
have to pay out additional monies in year.   The financial situation facing
Social Work is extremely challenging due to increases in demand,
complexity of cases, increasing costs and difficulty recruiting permanent
staff and therefore having to rely on agency staff.  At the time of writing this
report, the forecast budget for 2026-27 has a £2.872m gap after savings
and utilisation of reserves. 
Medium/High
(2025-26 Medium/High)
Impact of Climate
Change
Climate change is expected to have an increasingly significant and
damaging impact on coastal communities in the West of Scotland with
changes in sea level and weather patterns, through a combination of more
frequent and intense storms, increasing the risk of flooding and damage to
homes and infrastructure. With its unique geography, numerous islands and
exposed coastline, Argyll and Bute is especially vulnerable with severe
storms in October 2023 and January 2025 causing substantial damage to
infrastructure and property and jeopardising the safety of residents. 
Medium/High
(2025-26 Medium/High)
Page 171

Page 172

Risk Assessment for Review of Reserves
Risk Category Comment Assessment
The Councils plays a crucial role in reducing the impact of climate change
by implementing sustainable policies, enhancing infrastructure resilience
and promoting community awareness. 
Page 172

Page 173

ARGYLL AND BUTE COUNCIL                 COUNCIL                                                                
FINANCIAL SERVICES             25 FEBRUARY 2026 
REVIEW OF CAPITAL ARRANGEMENTS - UPDATE 
1.0 EXECUTIVE SUMMARY 
1.1 As part of the 2025-26 budget process, the Capital Plan 2025-28 Summary
Report set out opportunities for improvements to current capital
arrangements.  As such, it was agreed that a review of existing capital
arrangements would be progressed during 2025-26.  The purpose of this
report is to provide a progress update, with recommendations brought forward
based on the outcomes of review elements completed to date; and to outline the
interim approach to capital for the 2026-27 budget process, pending the
outcome of the wider review.
1.2 Proposals have been brought forward for a revised approach to property
maintenance, repairs and renewals from 2026-27.  It has also been possible to
make improvements to governance reporting and to develop integrated financial
modelling to inform the capacity within available resources for additional capital
investment.  This will require to be supported by a strategic and flexible
approach to the financing of capital investment plans.
1.3 The report concludes that: 
1) An interim approach to capital planning is required for the 2026-27
budget process, pending the outcome of the wider review of capital
arrangements;
2) There are opportunities to take a more corporate and strategic
approach to property maintenance, repairs and renewals from 2026-27,
supporting long-term service and financial sustainability;
3) Work has been undertaken to develop integrated financial modelling
and to improve governance reporting.  This has helped inform the
capacity within existing resources for new capital investment;
4) The Section 95 Officer requires to take a strategic approach and
exercise flexibility within the capital funding framework, including the
use of earmarked reserves, in order to manage the impact of
Page 173 Agenda Item 3a

Page 174

investment decisions on the annual revenue budget and in the context
of safeguarding the council’s longer-term financial sustainability;
5) Preliminary high level financial modelling has been undertaken to
inform the capacity within the existing debt charges budget and
available reserve balances for future capital investment.  Whilst this is
a complex picture with several variables, there is considered capacity
within available resources to fund additional capital investment over the
short to medium-term.  This position will require to be monitored and
kept under review on an ongoing basis; and
6) It has not been possible to progress all aspects of the review during
2025-26, with a number of the original requirements not yet delivered.  It
is anticipated that these outstanding opportunities for improvement will be
progressed during 2026-27, subject to available resources. 
Page 174

Page 175

ARGYLL AND BUTE COUNCIL          COUNCIL
FINANCIAL SERVICES             25 FEBRUARY 2026 
REVIEW OF CAPITAL ARRANGEMENTS - UPDATE 
2.0 INTRODUCTION 
2.1 As part of the 2025-26 budget process, the Capital Plan 2025-28 Summary
Report set out opportunities for improvements to current capital
arrangements.  The ELT committed to undertake a review during 2025-26,
with recommendations to be reported back to members.  A detailed
specification of requirements of the review had still to be developed but was
anticipated to include the following: 
 Enhanced governance arrangements, including greater member
involvement in the allocation of capital resources; 
 Longer-term financial planning, including longer-term Capital Plan (5-10
years); 
 Integrated capital forecasting, treasury strategy and debt charges (revenue
budget) modelling; 
 A review of the capacity within the current debt charges budget for
additional investment, reflecting capital planning and treasury borrowing
assumptions; and
 An updated Capital Strategy, to help ensure that we are investing in our
infrastructure, to support council key strategic priorities.  
2.2 During 2025-26 to date, ELT has considered current capital arrangements and
proposals for improvements in more detail.  It has been possible to progress
elements of the review during 2025-26 and also to bring forward proposals for a
revised approach to property maintenance, repairs and renewals from 2026-27. 
However, it was recognised that aspects of the wider review, such as the
development of a long-term Capital Strategy, would not be concluded in
advance of the 2026-27 budget process, largely due to competing demands on
limited resources.  As such, ELT agreed an interim approach to capital for the
2026-27 budget process.
2.3 The purpose of this report is to provide a progress update, with
recommendations brought forward based on the outcomes of review elements
Page 175

Page 176

completed to date; and to outline the interim approach to capital for the 2026-27
budget process, pending the outcome of the wider review.  
3.0 DETAIL 
3.1 2026-27 Budget Process – Approach to Capital
3.1.1 In early 2025-26, ELT acknowledged that the development and implementation
of recommendations arising from a wider review of capital arrangements would
not be completed in advance of the 2026-27 budget process.  As such, it was
necessary to agree an interim approach to capital planning for the Council’s
2026-27 budget meeting.
3.1.2 It was agreed that a third year (2028-29) would not be added to the current
Capital Plan, at this stage.  The focus would remain on progressing the
transformational approach, while further exploring potential improved
arrangements for asset management/sustainability from 2026-27.  It was also
agreed that consideration should be given to the relationship between capital
investment in property asset sustainability and revenue spend on repairs,
maintenance and renewals, and whether the current Central Repairs Account
budget allocations are sufficient.
3.1.3 The previous years’ approach would be to roll forward the existing approved 3-
year 2025-28 Capital Plan into the new year and approve additional resource
allocations for a further year, to give a new 3-year 2026-29 Capital Plan. 
However, given that the Review of Capital Arrangements is currently in
progress, approval is now sought for updates to the rolled forward Capital Plan
for 2026-28 only, as an interim measure.  
3.1.4 Additional resource allocations in respect of 2028-29 and future years will be
deferred until the outcome of the Review.  It is anticipated that future investment
decisions would be in accordance with an approved Capital Strategy,
reflecting the long-term strategic priorities of the council, within affordability
constraints and long-term sustainability considerations. 
3.1.5 It has not yet been possible to progress work on developing a Capital Strategy
or to inform affordability over the longer term. However, it is recognised that
members may wish to consider additional capital investment in council
priorities, as part of the 2026-27 budget process, for example, in respect of
Roads Reconstruction.  It should be noted that while the completion of Priority
Investment Plans (PIPs) has not been required, project officers have been
requested to consider any 2026-27 additional investment requirements, that
cannot be funded from existing approved allocations.  It is anticipated that this
would be considered in the context of being critical to current council priorities,
pending the outcome of the Review and a member informed Capital Strategy. 
3.1.6 The 2026-28 Capital Plan has been updated in respect of the following:
Page 176

Page 177

• 2026-27 unfunded council priorities, such as required investment in Roads to
maintain current condition;
• Additional spend approvals in respect of any unbudgeted essential works,
necessary to comply with legislative or regulatory requirements (‘red risks’); 
• Implications of revenue budget savings options on the Capital Plan, subject to
approval of proposed options;
• Confirmed 2026-27 Scottish Government funding allocations and any
associated new commitments;
• Revised target for capital receipts from asset sales;
• Re-profiling of gross expenditure and project specific income across 2025-26,
2026-27 and future years, as at 31 December 2025. 
It will also be necessary to review the overall funding framework available to
finance capital spending plans; including the use of revenue resources,
recognising that there is an opportunity to take a more strategic approach to the
use of reserves earmarked for capital purposes; and the implications on
required borrowing. 
3.2 Corporate Property Repairs, Maintenance and Renewals
3.2.1 As referenced at paragraph 4.1.2, a review of current arrangements and budget
resources in respect of property repairs, maintenance and renewals has
concluded during 2025-26, with proposals now brought forward for
implementation from 1 April 2026.   A revised approach has been developed
jointly by Financial and Property Services officers, and has been endorsed by
ELT as an opportunity for significant improvement.  
3.2.2 The proposals outline a revised corporate and strategic approach to the
management of property repairs, maintenance and renewals, including the
creation of a Corporate Property Repairs, Maintenance and Renewals
Programme, and a Repairs and Renewals Fund.  
3.2.3 A significant level of investment is required to maintain existing infrastructure,
in order to support service delivery and ensure compliance with regulatory or
legislative requirements.  The council’s Property Services currently facilitate
and manage repairs, maintenance and renewals in respect of the council’s
property asset portfolio, funded via annual revenue Central Repairs Account
(CRA) budgets and capital resources allocated to asset sustainability.
3.2.4 Annual CRA budget allocations have been consistently overspent in recent
years and spend has tended to be driven by short-term affordability, rather than
longer-term asset management plans. Budget pressures have left little capacity
for planned lifecycle maintenance, with legislative compliance and reactive
repairs requiring to be prioritised.  Notwithstanding the limitations around proper
accounting practice, block allocations of capital resources across services has
also been required to fund relatively low value asset sustainability projects.  
Page 177

Page 178

3.2.5 The limited capacity to undertake property maintenance, with a cumulative
impact over several years, has resulted in a deterioration in the building fabric
and essential systems across the council estate, which will ultimately result in
future higher costs (both revenue and capital).
3.2.6 The annual budget setting approach, rather than a multi-year resource
commitment, also presents significant challenges, potentially resulting in less
efficient and effective use of resources, and an impediment to a more strategic
approach to planning.  For example, certain more significant cyclical works
may only be required every 3, 5 or 10 years (for example, boiler replacement)
and rigid annual budgets therefore impede longer-term planning.  In order to
effectively manage assets and ensure the long-term sustainability and
performance of the council’s infrastructure, it also makes sense for revenue and
relevant capital resources to be aligned.
3.2.7 A multi-year Corporate Property Repairs, Maintenance and Renewals
Programme is therefore proposed, supporting a longer-term strategic
approach to planning. It is recommended that this should be managed as a
rolling programme with flexibility across financial years.  This would allow any
unforeseen regulatory or legislative compliance issues, or any other
unbudgeted costs, to be managed from within the available programme
resources and may require the re-profiling or re-prioritisation of planned
activities across the current and future years. 
3.2.8 The revised approach will also simplify current operational challenges in
relation to the management of expenditure within separate revenue and
capital budget resources.  Further, it is deemed more efficient for Property
Services Management costs to be met from within the overall available
Programme resources, thereby removing unnecessary administration
associated with internal recharging.  Expenditure will be accounted for in line
with proper accounting practice, as either revenue or capital, by finance
officers, in consultation with operational managers.
3.2.9 A corporate needs-based approach would be taken to the prioritisation of
property maintenance, repairs and renewals across council services, reflecting
the value, complexity, age and condition of assets held across the council
estate.  
3.2.10 It is recommended that the proposed approach be supported by a longer-term
financial commitment, initially for a period of 3 years.  The consolidation of
existing annual service CRA budgets (£3m per annum at 2026-27 prices) with
the redirection of existing reserves earmarked for capital purposes (£8m),
aligned with relevant available capital resources (estimated at £3m in 2026-27
and £9.3m over the 3 years 2026-29), is proposed, in order to provide an
appropriate level of overall programme funding.
3.2.11 Whilst a rolling 3-year programme is envisaged, for illustration purposes and
to inform the funding requirement over the initial 3 years, a Corporate
Property Repairs, Maintenance and Renewals Programme, totalling £8.5m in
Page 178

Page 179

2026-27, is deemed reasonable, on the basis outlined below. This represents
increased annual investment of £2.5m from current budget levels, taking
account of prevailing annual budget overspends, whilst making provision for
statutory requirements and capacity to undertake planned lifecycle works. 
Corporate Repairs, Maintenance and Renewals
Programme – Indicative Annual Expenditure Plan
2026-27
Budget
£m
Statutory Maintenance, Monitoring and Inspection, including
in respect of Legionella
3.1
Property Management Costs 1.0
Reactive/Emergency Repairs Provision 0.2
Increased capacity to undertake planned lifecycle
maintenance, repairs and renewals
1.2
Minor works, previously managed as part of the Capital Plan 3.0
Total Expenditure 8.5 
3.2.12 Inflationary cost increases will be applicable and it is therefore deemed
prudent for financial plans to assume £26.3m over 3 years.  The proposed
overall funding framework for both an indicative 2026-27 plan and the
proposed 3-year programme 2026-29 is given in the table below. Required
top-ups to the Repairs and Renewals Fund would be considered on an annual
basis, as part of the revenue budget, informed by programme planning and
forecast Fund balances over future years. 
Corporate Repairs, Maintenance and
Renewals Programme - Funding
2026-27
Budget
£m
2026-29
Budget
£m
Contribution from Repairs and Renewals Fund
(Existing CRA Budgets)
3.0 9.0
Contribution from Repairs and Renewals Fund
(Re-direction of reserves earmarked for capital
purposes to Repairs and Renewals Fund)
2.5 8.0
Total Contribution from Repairs and Renewals
Fund
5.5 17.0 
Estimated existing Capital funding (General
Capital Grant, Asset Sales, Borrowing), where
proper accounting practice permits. 
3.0  9.3 
Total Funding 8.5 26.3 
3.2.13 Notwithstanding that governance arrangements require to be considered and
agreed, as part of the overall Capital Review, as an interim measure, it is
proposed that a Property Asset Management Board be created from 2026-27,
with terms of reference to include ‘Prioritise and manage the delivery of a
Page 179

Page 180

rolling Corporate Repairs, Maintenance and Renewals Programme, within
available resources’.   
3.2.14 It should be noted that planned major renewal or refurbishment projects, of
strategic importance or critical to service sustainability, for example,
investment in Roads Infrastructure or Bridge Strengthening would not be
included within the Repairs and Renewals Programme.  These projects would
continue to be included within the Capital Plan.
3.3 Integrated Financial Modelling and Governance Reporting
3.3.1 A key function of the council’s treasury management service is the funding of
the authority’s capital investment plans.  The Capital Plan provides a guide to
the borrowing need of the authority, essentially informing longer-term cash
flow planning.  The CIPFA Code of Practice on Treasury Management (the
Code) and regulatory environment requires governance reporting on treasury
management to be undertaken on a quarterly basis.  The Code also requires
full Council to receive a Treasury Management Strategy, Mid-year Review
and Annual Report.  From 1 April 2025, the Capital Plan Monitoring report has
also been prepared on a quarterly basis, in order to support treasury
governance reporting requirements. 
3.3.2 Improvements have been made to the format of the Capital Plan Monitoring
report during 2025-26.  This now outlines total approved gross expenditure
and associated project specific income from project inception, for all assets
under construction.  Completed projects and programmes have been
removed from the plan, in order to focus on the delivery of live projects. 
Expenditure and project specific income incurred and received in previous
years is included, in order to provide complete information for any given
project.  Budget changes during the year are separately monitored and
movements in the profiled spend across the current and future years from the
previous quarter are also documented.  In addition, regular reporting on
progress with the delivery of asset sales is undertaken in consultation with
property colleagues.  Further opportunities for improvement will continue to be
sought, also having regard to the development of a Programme Management
Office (PMO).
3.3.3 The ongoing monitoring of the Capital Plan and any impact on borrowing is
reported as part of the Treasury Management reporting requirements
throughout the year.  For example, any slippage in planned capital
expenditure into future years or increased contractual cost obligations that
cannot be managed within available resources will have an impact on the
council’s forecast borrowing requirements or use of revenue resources
(earmarked reserves). 
3.3.4 The annual debt charges arising from borrowing require to be managed within
available revenue resources.  This includes reserve balances earmarked for
capital projects and additional revenue income related to prudential borrowing
Page 180

Page 181

projects, such as the Harbour Investment Programme, and Tax Increment
Financing (TIF). 
3.3.5 The Section 95 Officer requires to take a strategic approach to manage the
impact of capital investment on the council’s revenue budget, including the
use of earmarked reserves, to ensure that capital investment is affordable,
prudent and sustainable.  Work is ongoing to further develop integrated
financial modelling to support these strategic finance decisions.  The benefits
of maintaining a flexible funding framework to finance capital spending plans
are explored in more detail within Section 3.4. 
3.4 Flexible Capital Funding Framework
3.4.1 The overall funding framework for capital investment comprises the following: 
• General Capital Grant;
• General Capital Receipts from Asset Sales;
• Capital Financed from Current Revenue / Earmarked Reserves; and 
• Borrowing. 
3.4.2 General Capital Grant, General Receipts from Asset Sales and Borrowing are
not directly associated with any specific capital project within the approved
Capital Plan, rather, together with revenue resources (Capital Financed from
Current Revenue / Earmarked Reserves), they form part of an overall funding
framework, available to finance the overall Capital Plan net expenditure.  
3.4.3 The annual debt charges arising from borrowing require to be managed within
available revenue resources.  In addition to the revenue budget for debt
financing costs, this includes reserve balances earmarked for capital
purposes and additional revenue income related to prudential borrowing
projects, such as the Harbour Investment Programme, and Tax Increment
Financing (TIF). 
3.4.4 It is considered prudent to retain an element of flexibility within the capital
funding framework.  Annual General Capital Grant must be fully applied to
finance net capital expenditure in the year, however, other elements of the
funding framework can be used to a greater or lesser extent, for example, in
order to manage project slippage/acceleration into/from future years.  
3.4.5 As reported in the 2024-25 Year End Capital Plan Monitoring Report and
Treasury management Annual Report, due to significant slippage in the
capital programme, it had been possible within the debt charges revenue
budget capacity to borrow for expenditure, previously assumed to be met from
reserves, providing flexibility in the financing of future capital investment
plans.  It is anticipated that the Section 95 Officer will continue to take a
strategic approach to the use of reserves earmarked for capital purposes, in
order to enhance flexibility in managing the impact of capital investment on
the council’s revenue budget, and to ensure that capital investment is
affordable, prudent and sustainable.  
Page 181

Page 182

3.4.6 It is worth noting that all specific capital project spend approvals, including
those originally anticipated to be financed from reserves, are now reflected
within the 2025-28 Capital Plan.  However, it is not practical or of any notable
added value to maintain a link between capital financing and specific capital
investment expenditure approvals.  For example, in recent years, General
Capital Grant funding has been used by the Scottish Government as a
mechanism for providing additional grant funding for revenue purposes, which
has required flexibility to be exercised in the use of increased General Capital
Grant to release reserves previously earmarked for capital purposes.  This
required flexibility is in keeping with our preferred approach for a flexible
capital funding framework.   
3.4.7 A review of existing reserves has been undertaken to confirm those earmarked
for capital purposes.  It is anticipated that reserves earmarked for capital
purposes would be consolidated and used more strategically to either fund
capital investment or to smooth the impact of any annual spikes in debt charges
from new borrowing on the revenue account. As outlined at paragraph 3.2.10, it
is proposed to redirect £8m of these resources to a corporate Repairs and
Renewals Fund, with the remaining balance included within the overall capital
funding framework.
3.4.8 In light of the proposed flexible approach in the use of reserves earmarked for
capital purposes, as part of the overall funding framework for capital investment,
it is recommended that these reserves are consolidated into a Strategic Capital
Finance earmarked reserve. 
3.5 Capacity for New Investment 
3.5.1 Preliminary high level financial modelling has been undertaken to inform the
capacity within the existing debt charges budget and available reserve
balances for future capital investment.  This is a complex picture with several
variables, including the following:
 The profile of current approved capital spend across 2025-26 and
future years, with any slippage providing a short-term benefit in respect
of reduced borrowing costs.  This benefit will be eroded as approved
spend is incurred in due course.
 The level of the General Fund reserve balance and the profiled use of
General Fund earmarked reserve balances across 2025-26 and future
years. It has been possible to defer new external borrowing for capital
purposes due to the significant level of General Fund reserves held by
the authority.  However, as these reserves are drawn down and utilised
for their agreed purposes, this ‘internal borrowing’ for capital purposes
will require to be replaced by new external borrowing, with an
additional cost to the council overall.  For example, if the General Fund
balance was £100m and £150m was required to finance capital, net
external borrowing of only £50m would be required, however, if £20m
of earmarked reserves were drawn down, then required external
borrowing would increase to £70m at an overall increased cost.  This
Page 182

Page 183

reflects the switch from internal to external borrowing and the interest
earned on revenue balances foregone.
 The application of General Capital Grant and General Capital Receipts
from Asset Sales, with the application to shorter dated debt, for
example, in respect of vehicles or ICT, providing a greater annual
benefit over a shorter-term, and the application to longer dated debt,
for example, in respect of new buildings providing a reduced annual
benefit but for a period of up to 60 years.
 The economic outlook and interest rate forecasts, with new borrowing
potentially secured at lower interest rates than the existing debt
portfolio average rate.
 The use of reserves earmarked for capital purposes to either fund
capital investment or to manage the impact of debt charges arising
from borrowing on the revenue account.
 The extent to which future capital investment may be met by Scottish
Government funding or other capital receipts and contributions. 
3.5.2 Notwithstanding the complexities outlined above, there is considered capacity
within the existing annual debt charge budget and available reserves
earmarked for capital purposes to fund additional capital investment over the
short to medium-term.  This position will require to be monitored and kept
under review, with any requirement to increase the annual debt charges
budget in future years included within the future longer-term Budget Outlook.
3.5.3 Based on modelling assumptions, including in respect of asset useful life and
spending profiles across 2026-27 and future years, there is capacity within
existing resources over the short to medium-term to support the following
priority investments: 
• £18m Continued additional investment in Roads Infrastructure across
2026-27 and 2027-28 (£9m each year), to maintain the current standard;
• £2.5m Depot Rationalisation, in addition to essential building replacement
works (red risk) provided within new Capital Plan 2026-28 commitments;
• £1.8m Provision for Kilmory Redevelopment, in addition to the essential
legislative compliance works (red risks), provided within new Capital Plan
2026-28 commitments, subject to business case approval;
• £7m Increased provision, based on current affordability, in respect of the
authority’s contribution to a potential LEIP funded school; and
• £1.9m A816 Millbrae Landslip from existing Severe Weather earmarked
reserves and Capital Plan resources.
3.5.4  The level of investment funded from new borrowing and the application of
reserve balances earmarked for capital purposes to either fund investment or
to manage the impact of new borrowing on the revenue account is a strategic
finance decision and will be kept under review by the Section 95 Officer. 
Maximum flexibility will be exercised by the Section 95 Officer, within relevant
Local Government (Scotland) Regulations and proper accounting practice, in
order to manage the impact of investment decisions taken on the annual
Page 183

Page 184

revenue budget and in the context of safeguarding the council’s longer-term
financial sustainability. 
3.6 Future Workplan
3.6.1 It has not been possible to progress all aspects of the review during 2025-26,
with a number of the original requirements not yet delivered.  The future
development and delivery of these remaining elements will be subject to
securing additional resources.
3.6.2 The key requirements and expected outcomes still to be delivered comprise the
following:
 An updated Capital Strategy, informed by members, to help ensure that
we are investing in our infrastructure, to support council key strategic
priorities.
 Enhanced governance arrangements, including greater member
involvement in the allocation of capital resources; 
 Longer-term financial planning (5-10 year Capital Plan); and
 Ongoing refinement and maintenance of integrated financial modelling to
inform affordability and safeguard long-term financial sustainability. 
3.6.3 It is worth noting that Internal Audit has recently completed a Capital
Governance Arrangements audit, with a final report to be considered by the
Audit and Scrutiny Committee in March 2026.  The overall audit opinion in this
respect has been determined as reasonable.  This means that internal control,
governance and the management of risk are broadly reliable. However, there
are opportunities to strengthen the control and governance environment.  This
reflects the opportunities for improvement and requirements of the Capital
Review, previously highlighted as part of the 2025-26 budget process.  The
recommendations arising from this audit align with the Capital Review future
workplan.  
3.6.4 It is anticipated that these outstanding opportunities for improvement will be
progressed during 2026-27, with a revised approach to the allocation of
resources beyond the current Capital Plan (from 2028-29) developed in
accordance with strategic priorities and in the context of affordability.  
4.0 CONCLUSION
4.1 An interim approach to capital planning is required for the 2026-27 budget
process, pending the outcome of the wider review of capital arrangements.
4.2 There are opportunities to take a more corporate and strategic approach to
property maintenance, repairs and renewals from 2026-27, supporting long-
term service and financial sustainability.
Page 184

Page 185

4.3 Work has been undertaken to develop integrated financial modelling and to
improve governance reporting.  This has helped inform the capacity within
existing resources for new capital investment.
4.4 The Section 95 Officer requires to take a strategic approach and exercise
flexibility within the capital funding framework, including the use of earmarked
reserves, in order to manage the impact of investment decisions on the
annual revenue budget and in the context of safeguarding the council’s
longer-term financial sustainability.
4.5 Preliminary high level financial modelling has been undertaken to inform the
capacity within the existing debt charges budget and available reserve
balances for future capital investment.  Whilst this is a complex picture with
several variables, there is considered capacity within available resources to
fund additional capital investment over the short to medium-term.  This
position will require to be monitored and kept under review on an ongoing
basis.
4.6 It has not been possible to progress all aspects of the review during 2025-26,
with a number of the original requirements not yet delivered.  It is anticipated
that these outstanding opportunities for improvement will be progressed during
2026-27, subject to available resources.  
5.0 IMPLICATIONS
5.1 Policy – Sets out interim approach to capital planning for the 2026-27 budget
process, pending the outcome of the wider review of capital
arrangements.  This includes a revised approach to property repairs,
maintenance and renewals from 2026-27.
5.2 Financial – Outlines the planned investment and funding of a corporate
property repairs, maintenance and renewals programme.  The
development and implementation of wider aspects of the review may
require additional staff resources.
5.3 Legal - Statutory and Regulatory requirements in relation to property have
been provided for within the corporate property repairs, maintenance and
renewals programme. 
5.4  HR – Wider aspects of the review may require additional staff resources to
progress.
5.5 Customer Service - None specifically from this report.
5.6 Risk – Revised approach to property repairs, maintenance and renewals
minimises risk in respect of compliance with proper accounting practice
in respect of capital and revenue spend.
Page 185

Page 186

5.7 Climate Change – Due consideration of climate change will be reflected within
planned property maintenance, repairs and renewals, within available
programme resources.
5.8 Fairer Scotland Duty – Impacts will be considered, as appropriate.
5.9 Equalities - protected characteristics – Impacts will be considered, as
appropriate.
5.10 Consumer Duty - Impacts will be considered, as appropriate.
5.11 Island Communities - Impacts will be considered, as appropriate.
5.12 Children’s Rights and Wellbeing - None specifically from this report.
Kirsty Flanagan
Executive Director/Section 95 Officer
11 February 2026
Councillor Ross Moreland - Policy Lead for Finance and Commercial
Services
For further information contact:
Carolyn Earl, Head of Financial Services (Consultant)
carolyn.earl@argyll-bute.gov.uk
Page 186

Page 187

ARGYLL AND BUTE COUNCIL COUNCIL
FINANCIAL SERVICES 25 FEBRUARY 2026
CAPITAL PLAN UPDATE 2026-28  
1. EXECUTIVE SUMMARY 
1.1  A separate Review of Capital Arrangements Update report has been provided,
as part of the 2026-27 Budget Pack, setting out the interim approach to capital
planning for the 2026-27 budget process, pending the outcome of the wider
review.  This report outlines proposals for the required update for the remaining
2 years of the current Capital Plan, 2026-28.  
1.2 Funding constraints continue to limit the ability to deliver capital investment.  In
addition, the global economic landscape has presented significant inflationary
price increases, as well as disruptions to supply chains and longer lead in times. 
These impacts make it challenging to manage the delivery of the Capital Plan
within available resources and target completion timescales.   
1.3 The Local Government Finance Circular 1/2026 provided details of the updated
capital funding allocations for 2025-26 and the provisional allocations for 2026-
27.  This provided 2026-27 General Capital Grant of £9.975m, excluding
effectively ring-fenced or directed funding of £6.099m.  This represents £0.309m
more general funding than previous planning assumptions for each of the years
2026-27 and 2027-28.  In addition, the updated 2025-26 settlement provides a
further £0.007m of available funding. 
1.4  The ring-fenced or directed funding of £6.099m, included within the 2026-27
General Capital Grant, comprises £0.379m for Flooding, £0.270m for Nature
Restoration and £5.450m for Island Connectivity.  The Scottish Government has
confirmed additional capital funding of £19.700m in total over the next 2 years
(£5.450m 2026-27 and £14.250m 2027-28) to support investment in a new Jura
Ferry (£12.000m) and Ferry Slips (£7.700m).  This brings the total of notified
ring-fenced or directed funding being made available through the General
Capital Grant to £20.349m over 2026-28. In addition, as agreed in February
2025, an allocation from the General Capital Grant to Private Sector Housing
Grant (PSHG) is provided for at £0.820m in 2026-27 and £0.819m in 2027-28. 
1.5  The settlement also provides for additional capital grant funding of £20m across
Scotland in 2026-27 for Climate Emergency, to be included within the General
Capital Grant, assumed to be non-recurring.  Given that project planning across
the programme will already take cognisance of climate change, as a key
consideration, it has not been necessary to augment planned project expenditure
in this respect.  As such, the authority’s share of this funding, estimated at
£0.482m, represents additional available resources for 2026-27.  This gives an
overall net increase of £1.107m in available General Capital Grant funding over
the remaining 2 years of the current Capital Plan, 2026-28. 
Page 187 Agenda Item 3b

Page 188

1.6 The current approved Capital Plan 2025-28 includes an updated asset sales
target totalling £2.025m over these 3 years.  A total of £1.500m is currently
estimated to be achieved in 2025-26, with a remaining balance of £0.525m to be
achieved over 2026-28.  However, based on an updated assessment undertaken
by Commercial Services on potential sales opportunities that may reasonably be
achieved over the 2 years 2026-28, this target has been updated to £2.000m,
representing an overall increase of £1.475m in available funding over the 2 years
2026-28.   
1.7 As at 31 December 2025, there was a forecast overspend of £0.166m on the
current 2025-28 Capital Plan, however, this is expected to be managed within
existing available resources.  No additional spend approvals are being sought in
this respect, at this stage.  However, there are spending requirements totalling
£3.385m, deemed to be essential, either critical to maintain service delivery, or
to comply with legislation or regulation (Red RAG status risks), that cannot be
managed within existing available resources.   
1.8 In addition to the new commitments associated with the ring-fenced or directed
funding provided through the General Capital Grant, new capital commitments in
respect of proposed recharges to capital, totalling £0.604m, require to be
provided for within the Capital Plan, subject to member approval. 
1.9 After taking account of the additional capital resources available from General
Capital Grant and Asset Sales, there is a shortfall of £1.407m in the funding
available to meet new capital commitments.  However, work has been
undertaken, as part of the Review of Capital Arrangements, to establish the
capacity within existing available revenue resources (annual debt charges
budget and reserves earmarked for capital purposes) to support new capital
investment.  There is also an opportunity for this to be further augmented by
additional borrowing, with the revenue consequences, in terms of debt charges,
accounted for as part of the annual revenue budget for 2026-27 and future
years. 
1.10 Additional investment priorities across council services have been identified,
including in respect of the Roads programme for 2026-28, with an estimated
shortfall of £9m each year to maintain the current standard. Council officers have
brought forward investment proposals for members’ consideration, in line with
the overall capacity to support additional capital expenditure, with no forecast
impact on the revenue budget over the short to medium term.   
1.11 A number of known risks, specifically related to the delivery of the Capital Plan,
are documented within this report.  These risks may impact the delivery of the
plan within available resources and target timescales.   
1.12 Opportunities to take a more strategic approach to capital planning and to
enhance existing governance arrangements around capital investment activity
will continue to be progressed during 2026-27. 
Page 188

Page 189

ARGYLL AND BUTE COUNCIL COUNCIL
FINANCIAL SERVICES                                          25 FEBRUARY 2026
CAPITAL PLAN UPDATE 2026-28  
2. INTRODUCTION 
2.1  Council approved a rolling 3-year Capital Plan 2025-28 in February 2025.  At
the same time, it was agreed that opportunities to take a more strategic
approach to capital planning and to enhance existing governance arrangements
around capital investment activity would be further explored during 2025-26.   
2.2 An update on the Review of Capital Arrangements is subject to a separate
report to Council, as part of the 2026-27 Budget Pack.  This sets out the interim
approach to capital planning for the 2026-27 budget process, pending the
outcome of the wider review.  It is anticipated that recommendations from the
review will have implications for the allocation of capital resources for future
years beyond the current 2025-28 approved Capital Plan.  As such, this report
outlines proposals for the required update, including additional new spending
proposals, for the remaining 2 years of the current Capital Plan 2026-28. 
3. DETAIL 
3.1 Capital Funding Updates 2026-28 
3.1.1 Funding constraints continue to limit the ability to deliver capital investment.  In
addition, the global economic landscape has presented significant inflationary
price increases, as well as disruptions to supply chains and longer lead in
times.  These impacts make it challenging to manage the delivery of the Capital
Plan within available resources and target completion timescales. 
3.1.2 The Local Government Finance Circular 1/2026, published on 13 January 2026,
provides details of the updated capital funding allocations for 2025-26 and the
provisional allocations for 2026-27. These provisional 2026-27 funding
allocations form the basis for the annual consultation between the Scottish
Government and COSLA, ahead of the Local Government Finance (Scotland)
Order 2026 being presented to the Scottish Parliament.  This is currently
scheduled for the end of February 2026. 
3.1.3 The 2025-28 Capital Plan, approved in February 2025, included future year
General Capital Grant assumptions for 2026-27 and 2027-28 at the 2025-26
level of £9.666m.  This excluded 2025-26 effectively ring-fenced or directed
funding of £1.198m; specific grant of £0.383m; and £0.963m in respect of
additional Climate Change funding, expected to be non-recurring.  Council also
agreed to effectively top-slice the General Capital Grant to provide an allocation
to Private Sector Housing Grant at £0.820m in 2026-27 and £0.819m in 2027-
28.   
Page 189

Page 190

3.1.4 The Local Government Finance Settlement Circular 1/2026 provided 2026-27
General Capital Grant of £9.975m, excluding effectively ring-fenced or directed
funding of £6.099m.  This represents £0.309m more general funding than
previous planning assumptions for each of the years 2026-27 and 2027-28.  In
addition, the updated 2025-26 settlement provides a further £0.007m of
available funding. 
3.1.5 The settlement also provides for additional 2026-27 capital grant funding of
£20m across Scotland for Climate Emergency, to be included within the
General Capital Grant, assumed to be non-recurring.  Whilst the distribution
across individual authorities has yet to be confirmed, based on the expected
distribution formula, additional funding of £0.482m has been assumed for 2026-
27.  Given that project planning across the programme will already take
cognisance of climate change, as a key consideration, it has not been
necessary to augment planned project expenditure in this respect.  As such,
this funding represents additional available resources for 2026-27.  However,
members may wish to consider specific additional investment in this respect. 
3.1.6 Overall, there is an increase in available General Capital Grant funding of
£0.007m in respect of 2025-26, £0.791m in respect of 2026-27 and £0.309m in
respect of 2027-28.  This gives a net increase of £1.107m in available capital
resources over the remaining 2 years of the current Capital Plan, 2026-28. 
3.1.7 The ring-fenced or directed funding of £6.099m, included within the 2026-27
General Capital Grant, comprises £0.379m for Flooding, £0.270m for Nature
Restoration and £5.450m for Island Connectivity.  In respect of Island
Connectivity, following a bid for additional resources, the Scottish Government
has confirmed additional capital funding of £19.700m in total over the next 2
years (£5.450m 2026-27 and £14.250m 2027-28) to support investment in a
new Jura Ferry (£12.000m) and Ferry Slips (£7.700m).  This brings the total of
notified ring-fenced or directed funding being made available through the
General Capital Grant to £20.349m over 2026-28. 
3.1.8  There is a rolling 3-year target for capital receipts from asset sales, forming part
of the overall capital funding framework.  The current approved Capital Plan
2025-28 includes an updated asset sales target totalling £2.025m over these 3
years.  A total of £1.500m is currently estimated to be achieved in 2025-26, with
a remaining balance of £0.525m to be achieved over 2026-28.  However, based
on an updated assessment undertaken by Commercial Services on potential
sales opportunities that may reasonably be achieved over the 2 years 2026-28,
this target has been updated to £2.000m, profiled £1.500m 2026-27 and
£0.500m 2027-28.  This represents an overall increase of £1.475m in available
funding over the 2 years 2026-28.  However, it should be noted that this is
largely predicated on a single significant sale value being delivered in 2026-27. 
Assets currently available for sale or declared surplus, expected to generate a
future capital receipt are listed in Appendix 1. 
3.2 New Capital Commitments 
3.2.1 As at 31 December 2025, there is a total forecast overspend of £0.166m on the
current 2025-28 Capital Plan.  However, there is deemed to be capacity within
the current approved Capital Plan to manage the forecast overspends within
Page 190

Page 191

existing available resources.  An allocation of additional resources in respect of
the forecast overspend as at 31 December 2025 is therefore not being sought,
at this stage.   
3.2.2  There are spending requirements totalling £3.385m, deemed critical to maintain
service delivery or to comply with legislation or regulation (Red RAG status
risks), that cannot be managed within existing available resources.  The Capital
Plan Gross Expenditure therefore requires to be increased by £3.385m in 2026-
27, in respect of the following: 
Red RAG Status Risk Description Cost Estimate
£m
Replacement of temporary Depot Building at County Yard,
Lochgilphead following demolition of condemned building.
(Initial high level working cost estimates were received on
15 January from the council’s internal quantity surveyor. 
The costs of the building only have been extracted from
the overall cost estimate.)
1.159
Essential works at Kilmory Castle to comply with legislative
requirements (Health and Safety, DDA compliance).
(Cost estimates were presented to ELT in January for total
castle refurbishment.  The estimated costs of essential
works only, including re-wiring, accessibility upgrades and
replacement of end of life air system, extracted from the
overall cost estimate, total £3.771m.  Existing available
resources of £1.545m have been confirmed, with a funding
shortfall of £2.226m.)
2.226
Total 3.385 
3.2.3  New expenditure commitments require to be reflected, where ring-fenced or
directed funding has been made available within the General Capital Grant, as
set out within paragraph 3.1.7.  The Capital Plan gross expenditure budget
requires to be increased by £20.349m in respect of these specific projects over
the 2 years 2026-28.   
3.2.4 The 2026-27 revenue budget savings options, subject to member approval,
include recharges to capital of £60k per annum from 2025-26 in respect of
Financial Services support to capital and £112k per annum from 2026-27 in
respect of project management support to the Rural Growth Deal.  In addition to
required assumed recharges of £200k over 2026-28, recharges totalling
£0.544m over the 2 years 2026-28 (£0.604m over the 3 years 2025-28), require
to be reflected within the Capital Plan. 
3.3  Updated Capital Plan 
3.3.1  Updated gross expenditure totalling £179.239m has been profiled over 2026-27,
2027-28 and future years.  At this stage, gross expenditure profiled within future
years is wholly in respect of the Harbour Investment Programme. 
3.3.2 Project specific grant funding and other capital contributions are accounted for
within specific projects.  Estimated project specific income totals £0.165m over
the 2 years 2026-28.  This comprises £0.075m in 2026-27 in respect of Oban
Page 191

Page 192

Airport Business Park and £0.090m in 2026-27 in respect of Harbour
Investment Programme – Coastal Community Fund.  After accounting for
project specific income, the Capital Plan net expenditure that requires to be
financed totals £179.074m.   
3.3.3 The updated Capital Plan, subject to member approval of new spending
commitments outlined within Section 3.2, is summarised in the table below. This
is prior to any additional investment, within available resources, explored within
Sections 3.5 – 3.6 of this report.  A more detailed analysis of gross expenditure
at capital project level is given within Appendix 2.   
2026-27
£m
2027-28
£m
Future
Years
£m
Total
£m
Forecast Gross Expenditure as at
Qu.3 2025-26 50.936 60.801 43.390 155.127
Forecast Overspend to be managed
within available resources -0.166   -0.166
New Commitments - Notified Ring-
fenced/Directed GCG Funding 6.099 14.250  20.349
New Commitments – Recharges to
Capital 0.272 0.272  0.544
New Commitments – Red RAG
Status Risks 3.385   3.385
Total Gross Expenditure 60.526 75.323 43.390 179.239
Project Specific Income 0.165   0.165
Net Expenditure 60.361 75.323 43.390 179.074     
Executive Directorate (Douglas
Hendry):        
Education 3.515 9.988  13.503
Facility Services - Shared Offices 7.045 0.382  7.427
Major Projects/CHORD 11.541   11.541         
Executive Directorate (Kirsty
Flanagan):       
ICT 0.820 0.688  1.508
Roads and Infrastructure 32.094 63.229 43.390 138.713
Development and Economic Growth 3.023 0.112  3.115      
Non-departmental 0.160 0.160  0.320     
Health and Social Care
Partnership 1.880 0.382  2.262      
Live Argyll 0.468 0.382  0.850      
Total Gross Expenditure 60.526 75.323 43.390 179.239
Project Specific Income 0.165   0.165
Net Expenditure 60.361 75.232 43.390 179.074 
Page 192

Page 193

3.4 Capital Financing 
3.4.1  There is an overall funding framework available to meet the capital financing
requirement.  This framework comprises the following:
• General Capital Grant;
• General Capital Receipts from Asset Sales;
• Capital Financed from Current Revenue / Earmarked Reserves; and 
• Borrowing. 
3.4.2 As outlined within the separate Review of Capital Arrangements Update report,
it is appropriate to retain an element of flexibility within the capital funding
framework. The Section 95 Officer requires to take a strategic approach and
exercise flexibility within the capital funding framework, including the use of
reserves earmarked for capital purposes, in order to manage the impact of
investment decisions on the annual revenue budget and in the context of
safeguarding the council’s longer term financial sustainability. 
3.4.3 The annual debt charges arising from borrowing require to be managed within
available revenue resources.  In addition to the revenue budget for debt
financing costs; this includes reserve balances earmarked for capital purposes;
and additional revenue income related to prudential borrowing projects, such as
the Harbour Investment Programme, and Tax Increment Financing (TIF). 
3.4.4 The potential impact on borrowing arising from the ongoing monitoring of the
Capital Plan delivery is reported to the Audit and Scrutiny Committee and
Council throughout the year, as part of the Treasury Management governance
requirements.  For example, slippage in planned capital expenditure into future
years may have an impact on the council’s forecast borrowing requirements.     
3.4.5  The funding framework for the capital net expenditure outlined in paragraph
3.3.3, prior to any additional investment explored within Sections 3.5 to 3.6 of
the report, is given in the table below. This includes the updated capital
planning assumptions in respect of General Capital Grant and Capital Receipts
from Asset Sales set out at paragraphs 3.1.6 and 3.1.8.   
2026-27
£m
2027-28
£m
Future
Years
£m
Total
£m
Net Capital Expenditure 60.361 75.323 43.390 179.074
Funded by:        
General Capital Grant 15.736 23.406  39.142
General Asset Sales 1.500 0.500  2.000
Borrowing/Earmarked Reserves 43.125 51.417 43.390 137.932
Total Funding 60.361 75.323 43.390 179.074 
3.4.6 There are projects where the annual debt charges are expected to be fully offset
by revenue budget savings, either through increased income or reduced
expenditure, over the useful life of the project deliverables, with no impact on
Council Tax.  This is generally referred to as prudential borrowing and accounts
for £101.165m of the overall borrowing requirement in the above table, in
respect of the Harbour Investment Programme. 
Page 193

Page 194

3.5  Additional Investment Priorities 
3.5.1 As part of the approach to capital for the 2026-27 budget process, Services
were requested to provide details of any unfunded priorities for 2026-27.  The
Head of Roads and Infrastructure Services has advised of a 2026-27 estimated
funding shortfall in Roads investment of £9m, compared to a planned level of
investment from the previously approved block allocation of £2m.  This is the
estimated additional level of investment that would be required to maintain
roads to the current standard (steady state), based on an estimated cost of
£11m, at the lower end of the £11m - £14m range provided by SCOTS. 
3.5.2 A business case is currently being progressed for the redevelopment of Kilmory
Castle, which will include the essential Health and Safety works outlined at
paragraph 3.2.2 but will also provide an opportunity to generate future income
streams.  However, there is currently no provision within the current Capital
Plan for the enhanced level of investment. 
3.5.3 The council’s funding bid to the Scottish Government’s Learning Estate
Investment Programme (LEIP) for a new school campus on Mull was
successful.  While this is good news and will provide welcome investment in the
school estate, it will not meet the full cost of the project.  The Scottish
Government will fund up to 50% of eligible costs, with the balance of circa.
£20m to be funded by the council.  To date, the council has earmarked reserves
totalling £9m in this respect.  However, consideration requires to be given to
augmenting the current level of provision towards the council’s potential funding
contribution, based on current affordability. 
3.5.4 The wider capital review is expected to include the development of a longer
term Capital Strategy from 2028-29, aligned to the strategic priorities of the
council.  However, members may wish to consider other investment priorities for
the current planning period 2026-28, for example, specifically in relation to
Climate Change or in respect of potential commercial opportunities. 
3.6 Capacity for Additional Investment 
3.6.1  After taking account of the additional capital resources available from General
Capital Grant and Asset Sales, there is a shortfall of £1.407m in the funding
available to meet new capital commitments.  This is summarised in the following
table.   
£000
Increase to 2025-26 GCG 7
Increase to 2026-27 GCG  309
Increase to 2027-28 GCG Assumption 309
2026-27 Climate Emergency Fund (Non-recurring) 482
Additional Asset Sales 1,475
Page 194

Page 195

Current Capital Plan Forecast Overspend 0
Red Risks (Regulatory, Critical) (3,385)
Additional Commitments – Recharges to Capital (604)
Net Funding Shortfall (1,407) 
3.6.2 Work has been undertaken, as part of the Review of Capital Arrangements, to
establish the capacity within existing available revenue resources (annual debt
charges budget and reserves earmarked for capital purposes) to support
additional capital investment.  Detailed information in this respect is included
within the Capital Arrangements Review Update report. 
3.6.3  Council officers have considered the investment priorities set out at Section 3.5,
in light of the overall remaining capacity to support additional capital
expenditure, after providing for the funding shortfall outlined at paragraph 3.6.1. 
New investment proposals in this respect, as outlined within the Capital
Arrangements Review Update report, for consideration by members, are as
follows: 
• £18m Continued additional investment in Roads Infrastructure across
2026-27 and 2027-28 (£9m each year), to maintain the current standard;
• £2.5m Depot Rationalisation, in addition to essential building
replacement works, outlined at paragraph 3.2.2; subject to business case
approval;
• £1.8m Provision for Kilmory Redevelopment, in addition to the essential
legislative compliance works, outlined at paragraph 3.2.2, subject to
business case approval;
• £7m Increased provision, based on current affordability, in respect of the
authority’s contribution to a potential LEIP funded school; and
• £1.9m A816 Millbrae Landslip from existing Severe Weather earmarked
reserves and Capital Plan resources.
3.6.4 These proposals, together with the funding shortfall outlined at paragraph 3.6.1,
would be funded from a combination of new borrowing and the use of existing
reserves earmarked for capital purposes, in line with the flexibility exercised by
the Section 95 Officer within the capital funding framework, as outlined within
the Capital Arrangements Review Update report.  There is no forecast impact
on the revenue budget over the short to medium term in this respect.   
3.6.5 The estimated gross capital expenditure and borrowing requirement over 2026-
27 and future years, arising from the updated Capital Plan and providing for new
investment proposals, are reflected within the Capital and Prudential Indicators,
set out within the council’s 2026-27 Treasury Management Strategy.  Revenue
implications of borrowing in respect of future debt repayments are provided for
within the council’s revenue budget forecasts for 2026-27 and future years 
3.6.6 There is also an opportunity to fund further capital investment through additional
borrowing.  However, the revenue consequences, in terms of increased debt
charges, would require to be accounted for as part of the annual revenue
budget for 2026-27 and across future years.  For illustrative purposes, every
Page 195

Page 196

£1m of additional borrowing for capital purposes creates an annual revenue
budget pressure of circa. £0.065m, on average.  Measures to manage a
resulting increased budget gap would include additional revenue budget
savings or a greater increase in Council Tax levels. 
3.7 Capital Plan Risks 
3.7.1 The Finance Circular 1/2026 received on 13 January 2026 provided details of
Scottish Government grant funding for 2026-27.  There is, therefore, a degree of
certainty in respect of General Capital Grant funding for 2026-27, with 2027-28
funding assumed at the same level.  At the time of writing, the council’s share of
an additional £20m Climate Emergency Fund, to be paid as General Capital
Grant in 2026-27, has still to be confirmed.  The Capital Plan has assumed
additional funding of £0.482m in this respect for 2026-27 only.  Any variation in
the allocation of 2026-27 Climate Emergency Funding, or in the available 2027-
28 General Capital Grant, from these assumptions will require to be managed
within the overall Capital Plan resources. 
3.7.2 The funding framework for the approved Capital Plan includes capital receipts
from asset sales, estimated at £2.0m over the 2 years 2026-28, profiled £1.5m
2026-27 and £0.5m 2027-28.  This is based on an assessment provided by the
Estates Team in January 2026.  However, it should be noted that this is largely
predicated on a single significant sale value being delivered in 2026-27.  The
level of receipts that may reasonably be achieved will be kept under review, to
reflect changing market conditions and due diligence undertaken on asset
condition.  Any variation from this assumption will require to be managed within
the overall Capital Plan resources.  It is generally the case that the capital
programme experiences slippage throughout the year and as such, this risk is
expected to be manageable. 
3.7.3 The overall funding framework for capital and the affordability of capital
investment is based on a set of assumptions in respect of several variables,
which will continue to be subject to change on an ongoing basis, for example,
slippage in the delivery of capital projects or changes to interest rate
forecasts.  The Section 95 Officer will require to take a strategic approach and
exercise flexibility within the capital funding framework, in order to manage the
impact of investment decisions on the annual revenue budget and in the context
of safeguarding the council’s longer term financial sustainability. 
3.7.4 As capital project approvals are based largely on early indicative cost estimates,
there is a risk that actual costs will be more than originally planned, particularly
in the current economic climate and where there has been unavoidable project
delays.  The capital programme continues to be subject to significant inflationary
price increases, supply chain issues and longer lead in times, due to the impact
of world events on the global economy. Whilst these impacts have been
managed to date within available resources, there are likely to be other
significant cost pressures in respect of projects, where contracts have yet to be
entered into, which are not quantifiable, at this stage.  It will be challenging to
manage these impacts within available resources and target completion
timescales.  Actions to manage financial risk within available resources may
include re-profiling, project redesign, re-engineering or curtailment, and the re-
prioritisation of uncommitted resources across the programme.
Page 196

Page 197

3.7.5 The council’s funding bid to the Scottish Government’s Learning Estate
Investment Programme (LEIP) for a new school campus on Mull was
successful.  While this is good news and will provide welcome investment in the
school estate, it will not meet the full cost of the project.  The funding gap
requires to be met by the council and presents a financial pressure.  The
Scottish Government will fund up to 50% of eligible costs, with the balance of
circa. £20m to be funded by the council.  To date, the council has earmarked
reserves totalling £9m in this respect.  Further consideration will be given to
augmenting the current level of provision towards the council’s funding
contribution, as part of the 2026-27 budget process. 
3.7.6 There is a risk of further severe weather incidents, requiring both revenue and
capital expenditure to be incurred.  Whilst there may be additional funding
available through the Bellwin Scheme, this is limited to eligible revenue
expenditure only.  As part of the 2025-26 budget process, £2.9m was provided
for in respect of Severe Weather, with £0.9m specially reflected within the
current approved Capital Plan.  However, the Capital Plan 2026-28 Update
includes proposals for the use of these resources in respect of the A816
Millbrae Landslip (£1.9m), subject to member approval, which would
significantly deplete the current level of provision.  This risk is considered as
part of the council’s policy on the level of the general contingency balance held
within the unallocated General Fund reserve. 
3.7.7 The monitoring and review of these risks will continue to be undertaken on an
ongoing basis, with actions put in place to continue to mitigate or manage these
risks, as far as possible.  Actions to manage financial risk within available
resources may include re-profiling; project redesign, re-engineering or
curtailment, and the re-prioritisation of uncommitted resources across the
programme.  An update on risks will be reported regularly to Policy and
Resources Committee, as part of future Capital Plan monitoring reports. 
3.8 Opportunities for Improvement 
3.8.1 As part of the 2025-26 Budget Pack reported to Council in February 2025,
members noted that a review of capital arrangements would be undertaken
during the year.  A separate Capital Arrangements Review Update report,
outlining progress to date, has been provided as part of the 2026-27 Budget
Pack.  Whilst a number of elements have progressed, further work will be
required during 2026-27, subject to available resources, to deliver the full range
of desired outcomes, as set out in the February 2025 report.  Details of further
opportunities still to be progressed are outlined in the Review Update report. 
4. CONCLUSION 
4.1 An update to the previous 3 year Capital Plan 2025-28 has been provided in
respect of the remaining 2 years, 2026-28.  Proposals for future years beyond
2027-28 have not been brought forward, at this stage, pending the outcome of
the wider review of current capital arrangements.  Updated funding assumptions
and new spend commitments have been reflected in the updated Capital Plan
2026-28.   
Page 197

Page 198

4.2 After taking account of the additional capital resources available from General
Capital Grant and Asset Sales, there is a shortfall of £1.407m in the funding
available to meet new capital commitments.  However, a review of the capacity
within existing resources to support further investment has been undertaken
and it will be possible for this to be managed within existing resources.  It has
also been possible to bring forward proposals for additional investment in
council service priorities, in light of the capacity within existing resources, for
consideration by members.  There is also an opportunity to augment the level of
new investment in the highest priorities through additional borrowing, as set out
at paragraph 3.6.6 of the report.   
4.3 There are a number of Capital Plan risks that require to be monitored and
reviewed on an ongoing basis, and which will require to be managed within
available resources.   
4.4 Further opportunities to enhance current capital arrangements will continue to
be progressed throughout 2026-27. 
5. IMPLICATIONS 
5.1 Policy – Sets out the approach to capital planning. 
5.2 Financial – Outlines the planned capital investment and funding for the capital
planning period 2026-28. 
5.3 Legal - Statutory and Regulatory requirements in relation to Health and Safety
have been provided for within capital spending plans.   
5.4  HR - There are risks that the funding available will have an impact on the
sustainability of the Property Design Team and the design team within Roads and
Amenity Services. 
5.5  Customer Service – None specifically from this report. 
5.6 Risk - There are a number of risks impacting the delivery of the Capital Plan
within available resources and target timescales, which require to be monitored
on an ongoing basis. 
5.7  Climate Change – The council is committed to addressing climate change, within
the available budget resources. 
5.8 Fairer Scotland Duty - Impacts will be considered, as appropriate. 
5.9 Equalities – Protected characteristics - Impacts will be considered, as
appropriate. 
5.10 Consumer Duty – Impacts will be considered, as appropriate. 
5.11 Island Communities – Impacts will be considered, as appropriate. 
5.12 Children’s Rights and Wellbeing - None specifically from this report. 
Page 198

Page 199

Kirsty Flanagan
Section 95 Officer
11 February 2026
Councillor Ross Moreland - Policy Lead for Finance and Commercial
Services
APPENDICES:
Appendix 1 - Proposed Asset Disposals
Appendix 2 -  Proposed Capital Plan Gross Expenditure 2026-28
For further information please contact:
Carolyn Earl, Head of Financial Services (Consultant)
carolyn.earl@argyll-bute.gov.uk
Page 199

Page 200

Appendix 1 - Proposed Asset Disposals 2026-28
Property
Land at Former Police Station, Garelochhead
Ground at Baliscate Roads Depot, Tobermory
Former Erray Road Depot, Tobermory
Shop, 3 Montague Street, Rothesay
Rothesay Academy (former)
Ardchonnel Primary School
Hill Street Office, Dunoon
Former Registrar Office, Witchburn Road, Campbeltown
Former Finance Office, Witchburn Road site, Campbeltown
Former Lochgilphead Primary School and Whitegates, Lochgilphead
Land at Broom Road, Rosneath
Former Girl Guide Hut, Dunclutha Lane, Dunoon
Blairvadach site, Shandon, Helensburgh (Phase 2)
Minard Primary School
Hermitage Primary School, Helensburgh - Annex site
Lorn House, Oban
Helensburgh Waterfront - Commercial area
Kilchrenan Primary School
Area of ground adjoining Pier House Fionnphort, Isle of Mull
Dolphin Hall, Dunoon
Sites on Tiree / Coll
Luing Primary School
Ground at 125 Frederick Crescent, Bowmore
Dunclutha Children's Home (former), Dunoon
Note: Estimated sale values are not separately disclosed due to
commercial sensitivity.
Page 200

Page 201

APPENDIX 2
Proposed Capital Plan Gross Expenditure
Service Category Project
2026-27                 
£000s
2027-28                
£000s
Future Years
£000s
Total
£000s
Central Asset Sustainability Central Storm Provision 0 0 0 0
Financial Services - Recharges for Capital Plan Delivery 160 160 0 320
Asset Sustainability Total 160 160 0 320
Central Total 160 160 0 320
CHORD Strategic Change CHORD - Rothesay 11,523 0 0 11,523
Kilmory Business Park Phase 2AA 18 0 0 18
Strategic Change Total 11,541 0 0 11,541
CHORD Total 11,541 0 0 11,541
DEG Service Development Arinagour, Coll - Site Investigation -20 0 0 -20
Dunoon STEM Hub 1,750 0 0 1,750
Nature Restoration Fund 270 0 0 270
Rural Growth Deal 112 112 0 224
Active Travel Route Design and Planning 367 0 0 367
Service Development Total 2,479 112 0 2,591
Strategic Change 01 TIF - Lorn/Kirk Road 0 0 0 0
09 TIF - Oban Airport Business Park 0 0 0 0
Oban Business Park - Buliding Costs (Not TIF Funded) 0 0 0 0
TIF - Halfway House Roundabout 524 0 0 524
Strategic Change Total 524 0 0 524
DEG Total 3,003 112 0 3,115
Education Asset Sustainability Block Allocation - Education 1,988 1,988 0 3,976
Free School Meals 297 0 0 297
Primary Schools 0 0 0 0
Secondary Schools 0 0 0 0
Asset Sustainability Total 2,285 1,988 0 4,273
Service Development Bowmore Primary School - Gaelic Medium Grant 0 0 0 0
Early Learning and Childcare - 1140 Hours 174 0 0 174
Service Development Total 174 0 0 174
Strategic Change Campbeltown Schools Redevelopment 38 0 0 38
Dunoon Primary School 220 0 0 220
Kirn Primary School 34 0 0 34
Mull Joint Campus 358 0 0 358
Replacement of Oban High School 406 0 0 406
Learning Estate Investment Fund 0 8,000 0 8,000
Strategic Change Total 1,056 8,000 0 9,056
Education Total 3,515 9,988 0 13,503
HSCP Asset Sustainability Ardfenaig 0 0 0 0
Block Allocation - HSCP 0 382 0 382
Eadar Glinn 0 0 0 0
Glencruitten Hostel 0 0 0 0
Greenwood/Woodlands 0 0 0 0
East King Street 0 0 0 0
Kintyre Care Home 519 0 0 519
Lochgilphead Resource Centre 0 0 0 0
Page 201

Page 202

Proposed Capital Plan Gross Expenditure
Service Category Project
2026-27                 
£000s
2027-28                
£000s
Future Years
£000s
Total
£000s
Shellach View 0 0 0 0
Struan Lodge 641 0 0 641
Thomson Home Rothesay 720 0 0 720
Tigh An Rudha HFE 0 0 0 0
Asset Sustainability Total 1,880 382 0 2,262
Service Development Dunclutha Childrens Home 0 0 0 0
Service Development Total 0 0 0 0
HSCP Total 1,880 382 0 2,262
ICT Asset Sustainability Block Allocation - ICT 820 688 0 1,508
PC Replacement 0 0 0 0
Server Sustainability 0 0 0 0
Telecomms Network 0 0 0 0
Asset Sustainability Total 820 688 0 1,508
ICT Total 820 688 0 1,508
Live Argyll Asset Sustainability Aqualibrium 0 0 0 0
Block Allocation - Live Argyll 382 382 0 764
Corran Halls Gaelic Centre 86 0 0 86
Lochgilphead Community Ed Centre 0 0 0 0
Queen's Hall - Legionella Works 0 0 0 0
Riverside Leisure Centre 0 0 0 0
Rothesay Swimming Pool 0 0 0 0
The Moat Centre 0 0 0 0
Victoria Halls, Helensburgh 0 0 0 0
Asset Sustainability Total 468 382 0 850
Service Development Riverside Leisure Centre Refurbishment 0 0 0 0
Service Development Total 0 0 0 0
Strategic Change Carbon Management 0 0 0 0
Strategic Change Total 0 0 0 0
Live Argyll Total 468 382 0 850
RIS Asset Sustainability Block Allocation - RIS 3,677 3,823 0 7,500
Bridge Strengthening 773 0 0 773
Coastal Change Adaptation 250 0 0 250
Coastal Protection 0 0 0 0
Environmental Projects 597 0 0 597
EV Quick Chargers 0 0 0 0
Flood Prevention 379 156 0 535
Footway Improvements 0 0 0 0
Gartbreck - Capping 0 0 0 0
Helensburgh Flood Mitigation 0 0 0 0
Lighting 0 0 0 0
Local Bridge Maintenance Fund 4,344 0 0 4,344
Play Park Renewal 379 0 0 379
POPs Waste 0 0 0 0
Public Convenience Upgrades 0 0 0 0
Roads Reconstruction 0 0 0 0
Roads Safety and Improvement Fund 0 0 0 0
Page 202

Page 203

Proposed Capital Plan Gross Expenditure
Service Category Project
2026-27                 
£000s
2027-28                
£000s
Future Years
£000s
Total
£000s
Tobermory Car Park 96 0 0 96
Asset Sustainability Total 10,495 3,979 0 14,474
Service Development Bus Infrastructure Fund 414 0 0 414
Depot Rationalisation 0 0 0 0
EV Infrastructure Fund 0 0 0 0
Fleet Management 0 0 0 0
Fleet Management - Prudential Borrowing 0 0 0 0
Lochgilphead Depot Rationalisation 1,159 0 0 1,159
Oban Depot Development 0 0 0 0
Weather Incident 1,000 0 0 1,000
Service Development Total 2,573 0 0 2,573
Strategic Change Campbeltown Flood Scheme 711 0 0 711
Harbour Investment Programme Non PB 5,540 14,250 0 19,790
Harbour Investment Programme PB 12,775 45,000 43,390 101,165
Street Lighting LED Replacement 0 0 0 0
Strategic Change Total 19,026 59,250 43,390 121,666
RIS Total 32,094 63,229 43,390 138,713
Shared Offices Asset Sustainability 5-7 East Clyde Street - Coastal Communities Fund 384 0 0 384
Argyll House, Dunoon 0 0 0 0
Block Allocation - Shared Offices 746 382 0 1,128
Burnett Building 0 0 0 0
Graham Williamson IT Building 0 0 0 0
Helensburgh and Lomond Civic Centre 0 0 0 0
Kilmory Castle 3,763 0 0 3,763
Our Modern Workspace 218 0 0 218
Asset Sustainability Total 5,111 382 0 5,493
Strategic Change Campbeltown Office Rationalisation 0 0 0 0
Clean Energy - NDEEF1 238 0 0 238
Clean Energy - NDEEF2 1,140 0 0 1,140
Helensburgh Office Rationalisation  (FPB,REC) 300 0 0 300
Net Zero 256 0 0 256
Strategic Change Total 1,934 0 0 1,934
Shared Offices Total 7,045 382 0 7,427
Overall Total 60,526 75,323 43,390 179,239
Page 203

Page 204

This page is intentionally left blank