ARGYLL AND BUTE COUNCIL
FINANCIAL SERVICES
COUNCIL
25 FEBRUARY 2026
FINANCIAL RISKS ANALYSIS 2026-27  
1 EXECUTIVE SUMMARY 
1.1 The main purpose of this report is to provide a summary of the key financial risks
facing the council.   
1.2 A number of council wide financial risks, both revenue and capital, have been
identified, in addition to specific departmental or service risks.  For each
departmental risk, the potential annual financial impact has been quantified, and
the likelihood of the risk materialising assessed, based on a standard risk matrix. 
1.3  There are currently 6 council wide revenue risks identified for 2026-27, with a
potential annual value totalling £7.1m, and with varying degrees of likelihood. 
1.4 There are currently 30 departmental risks, with a potential annual value totalling
£4.557m, of which 5 are categorised as ‘Likely’.   
1.5 Financial risks are monitored and reviewed on an ongoing basis, with actions put
in place to continue to mitigate or manage these risks.

Page 2

ARGYLL AND BUTE COUNCIL
FINANCIAL SERVICES
COUNCIL
25 FEBRUARY 2026
FINANCIAL RISKS ANALYSIS 2026-27  
2. INTRODUCTION 
2.1 This report outlines the process and approach to financial risk assessment and
provides details of the currently known key financial risks facing the council in
2026-27. 
3 DETAIL 
3.1 Introduction 
3.1.1 The council is currently in a period of significant financial challenge.  In developing
its budget to address both funding, and cost and demand pressures,
consideration is given to financial risk.  However, both existing and new or
emerging financial risks require to be monitored and reviewed on an ongoing
basis throughout the year, with actions put in place to mitigate or manage these
risks.  Risks that cannot be mitigated or managed may have a detrimental impact
on the financial position of the council. 
3.1.2 There are a number of risks that may impact income or expenditure across the
entire council.  These are identified as council wide risks.  In addition, specific
financial risks impacting each department or service of the council have been
considered.  These are identified as departmental/service risks.  A de-minimis
level of £50k has been applied.  Risks with a potential annual risk value below this
level are expected to be managed within the relevant overall service budget. 
3.1.3 For each risk, the potential annual financial impact has been quantified and the
likelihood assessed based on the following standard risk matrix: 
1 – Remote
2 – Unlikely
3 – Possible
4 – Likely
5 – Almost Certain 
3.2 
3.2.1
Council Wide Risks 
General 
There is a risk of further severe weather incidents, requiring both revenue and
capital expenditure to be incurred.  Whilst there may be additional funding
available through the Bellwin Scheme, this is limited to eligible revenue
expenditure only and there is an assumption that local authorities will budget to
cover a proportion of the costs of emergency incidents from within internal
resources.  The threshold over and above where Councils’ can claim for eligible

Page 3

expenditure is 0.2% of a local authority's budgeted net revenue expenditure and,
for 2025-26, this equates to £0.613m for Argyll and Bute Council.  In 2025-26
additional budget of £2.9m was provided in respect of severe weather incidents
however there is no provision for additional costs in this respect within either the
2026-27 Revenue Budget or the 2026-29 Capital Plan The potential additional
costs are difficult to estimate by their very nature, however, a potential risk value
of £3m is deemed to be reasonable. 
Revenue 
3.2.2 Whilst the 2026-27 draft budget provides for inflationary increases, there is a risk
of continued volatility in utilities pricing and demand can also be subject to
unpredictable weather extremes.  A potential annual risk value equivalent to 5%
of the annual utilities budget provision is deemed reasonable.  This equates to
£0.4m. 
3.2.3  In respect of the Health and Social Care Partnership, it is the responsibility of the
Chief Officer and Chief Financial Officer to manage the HSCP financial position. 
If an overspend is forecast, a budget recovery plan will be prepared and
submitted to the IJB, Argyll and Bute Council and NHS Highland.  Where recovery
plans are unsuccessful and an overspend occurs at the financial year end, and
there are insufficient reserves to meet the overspend, then the partners will be
required to make additional payments to the HSCP.  The council would have to
contribute towards any overspend related to Social Work.  Whilst any additional
payments by the council and NHS Highland will be deducted from future years
funding, there is a risk that the council may require to make an additional
unbudgeted contribution to the HSCP during the year. The financial situation
facing Social Work is extremely challenging due to rising demand for services,
workforce shortages and the increasing complexity of care which are pushing
costs upward at a pace that exceeds available funding.  At the same time,
inflationary pressures and the need to maintain safe staffing levels are stretching
already constrained budgets.  At the time of writing this report, the forecast Social
Work budget for 2026-27 has a £2.872m funding gap, after accounting for
additional contributions from the council in respect of pay award budget
assumptions and assuming all proposed savings are accepted by the IJBWithin
the budget pack it is recommended that Members consider a funding allocation to
bridge this gap however there remains a risk that should the HSCP fail to deliver
on their savings proposals, or further pressures are identified, the council may
require to make an additional unbudgeted contribution to the HSCP during the
year  At this stage, the overall potential annual risk value has been estimated at
£2m. 
3.2.4 The estimated level of Council Tax income is based on current and forecast Band
D equivalents, and reflects our expected collection rates, based on historical data. 
A potential annual risk value equivalent to 1% of the annual Council Tax income
budget is deemed reasonable.  This equates to £0.8m. 
3.2.5  The 2026-27 Budget Pack includes both Operational/Management and Policy
savings options, totalling £6.090m.  Whilst the council has a good track record in
delivering savings, there is a risk that this target will not be fully delivered.  A

Page 4

potential annual risk value equivalent to a 10% shortfall in the annual savings
target is deemed reasonable.  This equates to £0.6m. 
3.2.6  There is an ongoing requirement to fund unavoidable inflationary cost increases
across a number of areas such as, food and fuel.  The Bank of England is
currently forecasting that inflation will continue to fall throughout the year, towards
the 2% government target.  This position will continue to be closely monitored,
with financial forecasts updated to reflect information available on an ongoing
basis.  The annual budget is underpinned by inflationary assumptions, however,
there is a risk that inflationary impacts have been under-estimated. A potential
annual risk value equivalent to 10% of the inflationary assumptions in respect of
relevant non-pay budgets is deemed reasonable.  This equates to £0.3m. 
3.2.7 The council’s Property Services currently facilitate and manage repairs,
maintenance and renewals in respect of the council’s property asset portfolio,
funded via annual revenue Central Repairs Account (CRA) budgets and capital
resources allocated to asset sustainability. Annual CRA budget allocations have
been consistently overspent in recent years due to an ageing estate, increasing in
statutory testing, emergency repairs and increases in supplier/contractor charges.
Within the budget pack the Review of Capital Arrangements Report addresses this
issue by proposing a multi-year Corporate Property Repairs, Maintenance and
Renewals Programme, supporting a longer-term strategic approach to planning
which would include a financial commitment to fund this for a period of 3 years
initially. There is a risk that if this recommendation is not approved by Council
then the current CRA budgets would be insufficient to meet demands. 
Capital 
3.2.8 The Finance Circular 1/2026 received on 13 January 2026 provided details of
Scottish Government grant funding for 2026-27.  There is, therefore, a degree of
certainty in respect of General Capital Grant funding for 2026-27, with 2027-28
funding assumed at the same level.  At the time of writing, the council’s share of
an additional £20m Climate Emergency Fund, to be paid as General Capital Grant
in 2026-27, has still to be confirmed.  The Capital Plan has assumed additional
funding of £0.482m in this respect for 2026-27 only.  Any variation in the
allocation of 2026-27 Climate Emergency Funding, or in the available 2027-28
General Capital Grant, from these assumptions will require to be managed within
the overall Capital Plan resources.   
3.2.9  The funding framework for the approved Capital Plan includes capital receipts
from asset sales, estimated at £2.0m over the 2 years 2026-28, profiled £1.5m
2026-27 and £0.5m 2027-28.  This is based on an assessment provided by the
Estates Team in January 2026.  However, it should be noted that this is largely
predicated on a single significant sale value being delivered in 2026-27.  The level
of receipts that may reasonably be achieved will be kept under review, to reflect
changing market conditions and due diligence undertaken on asset
condition.  Any variation from this assumption will require to be managed within
the overall Capital Plan resources.  It is generally the case that the capital
programme experiences slippage throughout the year and as such, this risk is
expected to be manageable.

Page 5

3.2.10 The overall funding framework for capital and the affordability of capital
investment is based on a set of assumptions in respect of several variables, which
will continue to be subject to change on an ongoing basis, for example, slippage
in the delivery of capital projects or changes to interest rate forecasts.  The
Section 95 Officer will require to take a strategic approach and exercise flexibility
within the capital funding framework, in order to manage the impact of investment
decisions on the annual revenue budget and in the context of safeguarding the
council’s longer term financial sustainability. 
3.2.11 The capital programme continues to be subject to significant inflationary price
increases, supply chain issues and longer lead in times, due to the impact of
world events on the global economy. Whilst these impacts have been managed to
date within available resources, there are likely to be other significant cost
pressures in respect of projects, where contracts have yet to be entered into,
which are not quantifiable, at this stage.  It will be challenging to manage these
impacts within available resources and target completion timescales.  Actions to
manage financial risk within available resources may include re-profiling, project
redesign, re-engineering or curtailment, and the re-prioritisation of uncommitted
resources across the programme. 
3.2.12 The council’s funding bid to the Scottish Government’s Learning Estate
Investment Programme (LEIP) for a new school campus on Mull was
successful.  While this is good news and will provide welcome investment in the
school estate, it will not meet the full cost of the project.  The funding gap requires
to be met by the council and presents a financial pressure.  The Scottish
Government will fund up to 50% of eligible costs, with the balance of circa. £20m
to be funded by the council.  To date, the council has earmarked reserves totalling
£9m in this respect.  Further consideration will be given to augmenting the current
level of provision towards the council’s funding contribution, as part of the 2026-
27 budget process. 
3.2.13 The Capital Plan monitoring report, as of 31 December 2025, outlines a forecast
overspend on the 2025-28 Capital Plan of £0.166m, however, this is expected to
be managed within existing available resources.  No additional spend approvals
are being sought in this respect, at this stage.  However, there are spending
requirements totalling £3.385m, deemed to be essential, either critical to maintain
service delivery, or to comply with legislation or regulation (Red RAG status risks),
that cannot be managed within existing available resources and Members will be
requested to approve additional resources in respect of these requirements. 
3.2.14  The council wide risks are summarised within the following table: 
Description  Likelihood
Assessed
Financial
Impact
£m
Unbudgeted Severe Weather costs 4 3.0
Energy costs increase by 5% greater than
budgeted
3 0.4

Page 6

IJB refer to Council for additional funding to
deliver social work services 
3 2.0
1% variation in Council Tax Income 2 0.8
10% shortfall on Savings delivery 2 0.6
10% variation on General Inflation 3 0.3
Total  7.1 
3.3 Departmental/Service Risks 
3.3.1 It should be noted that the council has a good track record of delivering services
within budget, however, there are specific financial risks impacting each council
department or service.  The detail of each departmental financial risk is included
within Appendix 1.  The following table provides a summary of the number of risks
within each department, across each likelihood category, together with the
potential annual financial impact value. 
Department 1 - Remote 2 - Unlikely 3 - Possible 4 - Likely 5 - Almost
Certain Total
No £000 No £000 No £000 No £000 No £000 No £000
Chief
Executive's
Unit
0 0 0 0 0 0 0 0 0 0 0 0
Executive
Director
Douglas
Hendry
0 0 5 450 8 680 1 60 0 0 14 1,190
Executive
Director Kirsty
Flanagan
2 150 2 183 8 1,995 4 1,039 0 0 16 3,367
Total 2 150 7 633 16 2,675 5 1,099 0 0 30 4,557 
3.3.2  The current top 3 risks in terms of the financial impact are noted in the table below. 
SERVICE  TITLE OF
RISK 
DESCRIPTION OF RISK LIKELIHOOD
FINANCIAL
IMPACT
£000
Financial
Services
Non-
Domestic
Rates
A revaluation exercise is due
for the 2026-27 year and the
impact is not known. 
Assuming the rateable value of
the Council's taxed assets
increase at a similar annual
rate to those seen at the 2023-
24 revaluation, the result could
be an increase of circa 20%,
equivalent to around £1m. The
outcome of the 2023-24
appeals has still to be
concluded which could result in
a repayment hence this is only
being identified as a risk at this
stage.
3 1,000

Page 7

Roads and
Infrastructure
Services
Piers &
Harbours
Income
Changes to ferry services
resulting in reduced berthing
and passenger income. As Cal
Mac work to provide services
across their network, an ageing
fleet and delays to new ferries
coming into service is meaning
larger ferries are being
removed from routes where we
have the berthing infrastructure
(mostly Craignure). Smaller
ferries are allowing for services
to operate but the drop in
income can be up to 75% per
berthing. 
4 700
Roads and
Infrastructure
Services
Roads
Maintenance
- Roads
Network
Adverse weather conditions
result in deterioration of the
road network necessitating
greater spend on repair of
defects. 
3 230 
3.3.3 The risks that are categorised as ‘likely’ are outlined in the table below. 
SERVICE  TITLE OF RISK  DESCRIPTION OF RISK LIKELIHOOD
FINANCIAL
IMPACT
£000
Roads and
Infrastructure
Services
Piers &
Harbours
Income
Changes to ferry services
resulting in reduced berthing
and passenger income. As
Cal Mac work to provide
services across their
network, an ageing fleet and
delays to new ferries
coming into service is
meaning larger ferries are
being removed from routes
where we have the berthing
infrastructure (mostly
Craignure). Smaller ferries
are allowing for services to
operate but the drop in
income can be up to 75%
per berthing. 
4 700
Development
and
Economic
Growth
Homelessness
Temporary
Accommodation
Income
Unpredictable number of
Homeless applications.
Inability to recover rent. 
Increase costs of property
maintenance and tenancy
change over.
4 150
Roads and
Infrastructure
Services
Fleet
Maintenance
Increased costs to maintain
internal fleet due to
inflationary increases on
vehicle parts.
4 100
Financial
Services
NDR ALEO
Relief Clawback
Risk that the Council will
experience a reduction in
General Revenue Grant due
to the phased clawback of
4 89

Page 8

Non-Domestic Rates relief
awarded to ALEOs in
excess of the agreed
baseline, following
confirmation by the Scottish
Government that the ALEO
relief clawback policy will be
implemented in future years
with clawback applied two
years in arrears, beginning
in 2026-27 for excess relief
awarded in 2024-25.
Legal and
Regulatory
Support
Elections Should a bi-election be
required this would be an
immediate cost pressure as
budget has been removed. 
4 60 
3.4 Monitoring of Financial Risks 
3.4.1 Financial risks are monitored and reviewed on an ongoing basis, with actions put
in place to continue to mitigate or manage these risks.  The updated position on
financial risks will continue to be regularly reported to Policy and Resources
Committee.     
3.5 Potential Future Risks 
3.5.1 There is a risk that changes to government policy may require to be implemented
by the council, with associated unbudgeted costs not fully met by additional
funding.  For example, an extension to funded childcare to all 1 and 2 year olds
across Scotland. 
3.5.2 The Council’s bid to the Scottish Governments Learning Estate Investment
Programme (LEIP) for funding for a new school campus on Mull was successful
and a report was considered by Council on 24 April 2024.  Approval was granted
to utilise £5m of £9m previously earmarked funds to develop the Business Case. 
The Scottish Government will fund up to 50% of eligible costs and the estimated
cost is £43m, with £41m deemed eligible, however these are just estimates at this
stage.  The Council will need to make a decision as to whether to proceed once
the project has been tendered.  There is a risk that the cost will be higher than
estimated and consideration requires to be given to augmenting the current level
of provision towards the council’s potential funding contribution, based on current
affordability.  There is also a risk that delays associated with the ongoing Judicial
Review will result in further cost increases.   
3.5.3 The Scottish Government has announced proposals for reduced teacher class
contact time, the purpose of the reduced time teaching has yet to be agreed at
COSLA. However, it is likely that it will include planning, preparation and
increased collaboration.  This could be a phased implementation although again
no agreement has been reached. The aim is to empower teachers to deliver
better educational outcomes for our children and young people.  However, there
are ongoing concerns regarding the potential cost implications, the ability to
recruit to additional posts, the impact on subject specialist teaching time

Page 9

especially in smaller secondary schools and the impact on other educational
services. 
3.5.4 The Scottish Government’s announcement for the 2026-27 budget included
investment in breakfast clubs and after-school clubs for schools. This included
universal breakfast clubs for every primary pupil by August 2027 and after school
clubs for all primary children who would like to access them.  At this stage it is
unclear how these initiatives will be funded and what the funding that is provided
will cover.  There is a risk that our large number of remote and rural schools will
have significantly higher costs to deliver these services to very small numbers of
children.  Furthermore, there may also be transport issues and recruitment and
resourcing issues. 
4 CONCLUSION 
4.1 This report summarises the known key financial risks facing the council in 2026-
27.  There are 6 council wide risks and 30 departmental risks identified, with 5
categorised as ‘Likely’.  These risks are monitored and reviewed on an ongoing
basis, with actions put in place to continue to manage or mitigate the risks.   
5 IMPLICATIONS 
5.1 Policy None.
5.2 Financial  Outlines the potential annual value of financial risks.   
5.3 Legal  None.
5.4 HR  None.
5.5 Customer Service  None.
5.6 Risk Provides details of financial risks.
5.7 Climate Change None.
5.8 Fairer Scotland Duty None.
5.9 Equalities (Protected
Characteristics)
None.
5.10 Consumer Duty None.
5.11 Island Communities None.
5.12 Children’s Rights and
Wellbeing
None. 
Kirsty Flanagan
Executive Director/Section 95 Officer
11 February 2026 
Councillor Ross Moreland, Policy Lead for Finance and Commercial Services 
APPENDICES
Appendix 1 – Detail of Department/Service financial risks. 
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk

Page 10

APPENDIX 1
DEPARTMENT/SERVICE FINANCIAL RISKS 2026-27
DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
Executive Director
Douglas Hendry
Commercial Services Catering Costs - Provision of
Meals to Early Years Children
The Children and Young People (Scotland) Act placed duties on Councils to
provide meals in an Early Years setting to entitled children where sessions span
over lunch time.  The total quantum of grant funding is reducing and may not be
sufficient to fund the additional costs depending on uptake and the additional
costs to support the meal provision in partner provider settings.
Joint strategy with procurement colleagues to reduce potential impact
of supplier charges.  Control food wastage/portion controls.
2 100
Executive Director
Douglas Hendry
Commercial Services Rental Income from Properties Due to current economic climate, there may be reduced ability to recover rental
income from leased properties or place suitable tenants in properties as leases
come to an end.
Management of leasehold properties by Estates team, any issues with
debt recovery being dealt with in line with Council debt recovery
policy.
3 100
Executive Director
Douglas Hendry
Commercial Services Surplus Properties Ongoing market difficulties lead to increased numbers of surplus properties, in
addition, as Our Modern Workspace Project gains traction more properties will
become surplus to operational requirements. There are residual running costs
associated with all surplus properties.
One Council property team in place who will monitor market
conditions and work with prospective tenants/ purchasers to let/sell
surplus properties.
3 50
Executive Director
Douglas Hendry
Education Pre-Five Units - retention of
partner providers
Failure in the commissioning or retention of pre-five partner provider units to
deliver 1140 hours would result in an increased pressure on the Council to
deliver the service.
Annual financial appraisal, uplift of sustainable rate to providers;
Support network; Short-term cash injections.
2 100
Executive Director
Douglas Hendry
Education Children and Young People
(Scotland) Act - ELC 1140 hours
The Council has been required to deliver 1140 hours of Early Learning and
Childcare since August 2021. The Scottish Government has committed to funding
this and the Council has revised its service model to align it to the Scottish
Government's reduced funding profile.  A risk remains that actual costs of
delivery exceeds available funding in any given year.  For example, if child
numbers are higher than estimated, this may require additional staffing which
has not been included in the staffing model funded by Scottish Government.  
Continuous monitoring and review of the service model, usage and
resources.
3 100
Executive Director
Douglas Hendry
Education ASN Support Demand for ASN support continues to increase. Scottish Government statistics
suggest 40.5% of school children have an identified additional support need, this
has more than doubled since 2014 from 20%, resulting in an additional resource
requirement particularly where gaps in our enhanced provision exist, the
geographical barrier which further hinders our ability to deliver equitable service
to all children requiring significant ASN support.  Further, the increase in Children
and Young People accessing support for mental health issues and the increased
numbers awaiting assessment for Neuro related issues can impact presentation
in education.  The medium-term detriments on the development of young
children which occurred as a consequence of service closures during the COVID
pandemic have increased demands on the service as children require additional
support to catch up.  The Additional Support for Learning National
Implementation plan continues to inform our strategic direction in line with the
Angela Morgan Review.
Service is currently implementing alternative options for service
delivery to mitigate the inescapable pressures. Continuing to ensure
robust assessment of needs, monthly monitoring of budget, any delays
in recruitment factored into projections to enable informed decision
making on allocation of funding for new/amended /additional support
packages. Following a full ASN review, the service are currently
investing in  four new learning centres in order to provide greater
equity in meeting the more complex needs of some learners as well as
considering plans to develop enhanced wellbeing resources across our
learning estate in future.  This aims to reduce the frequency of
children having to be educated in high cost out of area placements.
2 50
2026-27

Page 11

DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
Executive Director
Douglas Hendry
Education Legislative Requirements -
Scottish Languages Act
The Scottish Parliament agreed the  Scottish Languages Act. This is Act gives the
Gaelic and Scots languages official status in Scotland and makes changes to the
support for the Gaelic and Scots languages in Scotland. This includes changes in
relation to Gaelic and Scots education. It is clear that an education authority’s
duty to secure the provision of adequate and efficient school education for the
authority’s area may include Gaelic learner education and Gaelic medium
education. This  no longer applies only in Gaelic speaking areas. The teaching of
the Gaelic language as part of an education authority’s duty to provide further
education also no longer applies only in Gaelic speaking areas. Therefore, these
powers (along with the other provisions within the Act)  also help to ensure that
Gaelic medium primary pupils are able to continue their Gaelic education in
secondary school. Catchment areas for Gaelic Provision must be set out and
whilst we have custom and practice we have not established these formally.
Engage with the new Act to understand fully the requirements for
Education Service and ensure continuous monitoring and review of
the service model and resources available within budget. Establish a
timeline to implement changes required by the Act. Continue to seek
to recruit more Gaelic Teachers on flexible contracts.
3 50
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Hub DBDA/DBFM Schools  -
Litigation
Increased risk of the requirement to litigate due to latent defects in a number of
schools
Ongoing reporting of issues and monitoring of actions taken to repair. 2 150
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Legal Services - Litigation Increased number of litigation cases. Ensure Legal Services are gateway to access all legal advice and that
advice is sought at earliest opportunity.
3 150
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Contract RPI for NPDO and Hub
Schools
Increase in RPI would result in higher costs. Monitoring annual alteration to contract RPI rate and mitigation
through financial forecasting and review of existing budget.
3 100
Executive Director
Douglas Hendry
Legal and Regulatory
Support
NPDO - Increase in insurance
costs within NPDO Schools
Increase in insurance costs as a result of the long-term effects of Covid-19 on the
insurance market and flood claims.
Monitoring annual alteration to contract insurance rate and mitigation
through financial forecasting and review of existing budget.
3 75
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Elections Should a bi-election be required this would be an immediate cost pressure as
budget has been removed.
Outwith direct management control. 4 60
Executive Director
Douglas Hendry
Legal and Regulatory
Support
Licensing Reduced numbers of licensing applications leading to reduced income. Monitoring of trends and reporting the financial impact in the budget
monitoring.
3 55
Executive Director
Douglas Hendry
Legal and Regulatory
Support
NPDO/Hub DBFM contract
management efficiencies
Reduction in ability to generate contract management efficiencies. Monitoring annual efficiencies generated and mitigation through
robust contract management and application of contract
specifications / requirements.
2 50
Executive Director
Kirsty Flanagan
Customer Support
Services
Software Licences Potential risk of being under licensed for software which will be identified via
software audits which would incur additional costs.
ICT security and compliance officer in post and duties include review
of systems to ensure fully licenced. 
2 100
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Homelessness Temporary
Accommodation Income
Unpredictable number of Homeless applications. Inability to recover rent. 
Increase costs of property maintenance and tenancy change over.
Provision of Housing Options information and advice service to
minimise number of applicants proceeding to full homeless
application. Implementation of Rapid Rehousing Plan.
4 150
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Dangerous Buildings
Interventions
Building Standards having to deal with an increasing level of dangerous building
work which has significant financial implications for Council.
Monitor activity and seek to recover costs from the owner. 3 100
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Planning fee shortfalls Due to downturn in economic / building activity, in particular renewable energy
development and other major developments could lead to planning fee income
shortfalls leading to revenue budget pressures.
Current income levels are looking more positive, however, we are
dependent on some high value applications coming in which, if they
don't materialise, will impact the overall position.  Will continue to
monitor Development Management income and expenditure tightly
and investigate further income generation streams.
1 100
Executive Director
Kirsty Flanagan
Development and
Economic Growth
Building Warrant fee shortfalls Due to loss of commercial income and downturn in economic / building activity,
building warrant fee income shortfalls leading to revenue budget pressures.
Continue to monitor Building Standards income and expenditure
tightly and investigate further income generation streams.
1 50

Page 12

DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE
LIKELIHOOD
FINANCIAL
IMPACT
£000
Executive Director
Kirsty Flanagan
Financial Services Non-Domestic Rates A revaluation exercise is due for the 2026-27 year and the impact is not known. 
Assuming the rateable value of the Council's taxed assets increase at a similar
annual rate to those seen at the 2023-24 revaluation, the result could be an
increase of circa 20%, equivalent to around £1m. The outcome of the 2023-24
appeals has still to be concluded which could result in a repayment hence this is
only being identified as a risk at this stage.
Outwith direct management control. 3 1,000
Executive Director
Kirsty Flanagan
Financial Services NDR ALEO Relief Clawback Risk that the Council will experience a reduction in General Revenue Grant due
to the phased clawback of Non-Domestic Rates relief awarded to ALEOs in excess
of the agreed baseline, following confirmation by the Scottish Government that
the ALEO relief clawback policy will be implemented in future years with
clawback applied two years in arrears, beginning in 2026-27 for excess relief
awarded in 2024-25.
Monitoring of ALEO NDR relief against baseline; engagement with Live
Argyll and Corporate Finance; financial planning to reflect anticipated
General Revenue Grant reductions.
4 89
Executive Director
Kirsty Flanagan
Financial Services Sundry Debt Recovery Recovery of debt becomes more difficult to pursue in the current economic
climate. 
Additional staff have been put in place in the Sundry Debt Team and
remaining vacancies will be advertised shortly. This team  will work
jointly with Legal Services to enhance the robustness of the Council's
debt recovery processes.
3 85
Executive Director
Kirsty Flanagan
Financial Services Housing Benefit Subsidy Ongoing pressure arising from limitations in Housing Benefit subsidy for
temporary and supported exempt accommodation, where eligible rent exceeds
subsidy thresholds. Current costs are expected to be managed within Financial
Services budgets, but exposure could increase if demand or rent levels rise.
Active monitoring of Housing Benefit expenditure and subsidy; budget
management within Financial Services; use of in-year underspends to
offset pressures; and review as part of financial planning.
2 83
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Piers & Harbours Income Changes to ferry services resulting in reduced berthing and passenger income. As
Cal Mac work to provide services across their network, an ageing fleet and delays
to new ferries coming into service is meaning larger ferries are being removed
from routes where we have the berthing infrastructure (mostly Craignure).
Smaller ferries are allowing for services to operate but the drop in income can be
up to 75% per berthing.
Closely monitor passenger number information coming from CalMac
to identify any emerging trends with reducing passenger numbers. 
There is continuing conversation with CalMac to agree an annual flat
fee for berthing which would remove the risk that we have with the
current system.
4 700
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Roads Maintenance - Roads
Network
Adverse weather conditions result in deterioration of the road network
necessitating greater spend on repair of defects.
Manage maintenance budgets to ensure that spend is prioritised to
deal with safety defects.
3 230
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Car Parking Income Reduced number of visitors to the area and use of council owned car parks
resulting in a reduction in income.
Closely monitor income levels throughout the year, especially in high
visitor seasons.
3 200
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Winter Maintenance Adverse weather conditions which require greater than budgeted number of
gritting runs.
Monitor weather conditions and apply gritting policy to minimise
costs.
3 150
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Other Harbours - Repairs and
Maintenance
Ageing assets and cost increases for repair work required to be undertaken. Unable to capitalise work carried out, service are aware of this as part
of the wider RIS review as costs likely to reoccur if assets not replaced
3 130
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Street Lighting Age of lighting stock requires greater maintenance as health and safety becomes
a consideration.
Manage maintenance budgets to ensure that spend is prioritised to
deal with safety defects.
3 100
Executive Director
Kirsty Flanagan
Roads and
Infrastructure Services
Fleet Maintenance Increased costs to maintain internal fleet due to inflationary increases on vehicle
parts.
Review of Fleet underway to determine where reductions could
possibly be made.
4 100
30 4,557