Democracy Spraffa

2021_22_Interal Audit_ICTRemoteWorking_FinalReport

Argyll and Bute Council · 23 June 2022
Back to Audit and Scrutiny Committee — 23 June 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council
Internal Audit Report
May 2022
FINAL 
High Medium Low VFM
Number of
Findings
2 0 3 0 
ICT Remote Working
Audit Opinion: Substantial

Page 2

2 
Argyll and Bute Council – Internal Audit Report – ICT Remote Working, May 2022 
Contents 
1. Executive Summary ........................................................................................................................ 3
Introduction ............................................................................................................................................ 3
Background ............................................................................................................................................. 3
Scope ....................................................................................................................................................... 4
Risks ........................................................................................................................................................ 4
Audit Opinion ......................................................................................................................................... 4
Recommendations ................................................................................................................................. 5
2. Objectives and Summary Assessment ........................................................................................... 5
3. Detailed Findings ............................................................................................................................ 6
Appendix 1 – Action Plan ..................................................................................................................... 12
Appendix 2 – Audit Opinion ................................................................................................................. 15 
Contact Details 
Internal Auditor: Mhairi Weldon 
Telephone:  01546 604294 
e-mail:   Mhairi.weldon@argyll-bute.gov.uk

Page 3

3 
Argyll and Bute Council – Internal Audit Report – ICT Remote Working, May 2022
www.argyll-bute.gov.uk
1. Executive Summary
Introduction
1. As part of the 2021/22 internal audit plan, approved by the Audit & Scrutiny Committee in
March 2021, we have undertaken an audit of Argyll and Bute Council’s (the Council) system of
internal control and governance in relation to ICT Remote Working.
2. The audit was conducted in accordance with the Public Sector Internal Audit Standards (PSIAS)
with our conclusions based on discussions with council officers and the information available at
the time the fieldwork was performed. The findings outlined in this report are only those which
have come to our attention during the course of our normal audit work and are not necessarily
all the issues which may exist. Appendix 1 to this report includes agreed actions to strengthen
internal control however it is the responsibility of management to determine the extent of the
internal control system appropriate to the Council.
3. The contents of this report have been agreed with the appropriate council officers to confirm
factual accuracy and appreciation is due for the cooperation and assistance received from all
officers over the course of the audit.
Background
4. The Council is the second largest local authority in Scotland covering an area of 691,000
hectares, however, it has the third sparsest population density of approximately 88,000 of which
17% live on 23 inhabited islands.  The size of the area and population dispersion require multiple
communications facilities to ensure services are available to users.  Across this vast area, the
Council employs 4,435 members of staff, 1,980 of whom have an active user account providing
them with access to the Council’s corporate network and systems.
5. The Council has recognised a need for modern working practices and in 2011 implemented a
policy for ‘alternative ways of working’ and flexible working options.  Employee’s ICT user
accounts are managed by ICT and enable working from home via a virtual private network (VPN)
connection which is included as part of the standard software package installed on Council
owned laptops.  Prior to the COVID-19 pandemic, an average of 80 - 100 employees made use of
the facility to work from home on an occasional basis rising to around 200 - 250 during periods
of severe weather conditions.
6. On 23 March 2020 the UK government announced that all employees should work from home
where possible in response to the COVID-19 pandemic.  The Council’s ICT services were
therefore required to very quickly roll out remote working to all staff who are able to work from
home to enable continuity of service provision, thus creating an additional strain on existing
resources and ICT infrastructure.  In the period immediately following this announcement
around 1,300 employees were accessing the Council’s network and systems via VPN settling to
around 800 – 900 as time progressed.
7. The resulting increase in remote working heightens existing cybersecurity risks and introduces
new ones to many organisations when staff are working outside of their normal office
environment.  Phishing emails for example have increased 600% during the pandemic with all
sectors and individuals being targeted.

Page 4

4 
Argyll and Bute Council – Internal Audit Report – ICT Remote Working, May 2022
8. The General Data Protection Regulation (GDPR) came into force in 2018 and applies to all
organisations that use personal data, any breach of data protection rules is a very serious matter
and can incur substantial fines and other sanctions on the Council.
9. The Council has a legal duty of care to ensure the health, safety and wellbeing of its workforce.
As part of this duty, the Council has prepared an employee wellbeing strategy to improve the
overall wellbeing of the workforce both within and out with the workplace, they also seek to
ensure that employees are protected from potential health hazards caused by the use of display
screen equipment, and therefore, equipment provided should be suitable for the user’s needs
and workstation assessments periodically carried out.
Scope 
10. The scope of the audit was to assess the adequacy of policies, procedures and guidance relating
to future remote working arrangements as outlined in the Terms of Reference agreed with the
Head of Customer Support Services on 8 February 2022. 
Risks
11.  The risks considered throughout the audit were:
 SRR11:  Service Delivery – Cyber Security
 EDI ORR46:  Cyber Security Breach and associated cyber-attack cause catastrophic loss of
ICT systems, loss of sensitive data, loss of services, Financial risk; Failure to maintain ICT
assets to provide secure services in a high risk cyber environment
Systems not kept updated or maintained properly resulting in weakness in cyber security
 EDI ORR47:  Lack of capacity to meet unplanned demand for communications support
with existing resources
 LRS ORR2:  Failure to ensure Council compliance with governance and information
management arrangements
 LRS ORR14:  Failure to provide high quality and timely health and safety advice both
internally and externally to customers
 Audit Risk 1:  Failure to comply with GDPR requirements 
Audit Opinion
12. We provide an overall audit opinion for all the audits we conduct. This is based on our
judgement on the level of assurance which we can take over the established internal controls,
governance and management of risk as evidenced by our audit work.  Full details of the five
possible categories of audit opinion is provided in Appendix 2 to this report.
13. Our overall audit opinion for this audit is that we can take a Substantial level of assurance.  This
means that internal control, governance and the management of risk is sound. However, there
are minor areas of weakness which put some system objectives at risk and specific elements of
residual risk that are slightly above an acceptable level and need to be addressed within a
reasonable timescale.

Page 5

5 
Argyll and Bute Council – Internal Audit Report – ICT Remote Working, May 2022
Recommendations
14. We have highlighted two high priority recommendations and three low priority
recommendations where we believe there is scope to strengthen the control and governance
environment. These are summarised below:
 Education Management Circular 1.18 should be revised to remove the requirement for
parental consent forms to be completed
 Education management should identify an alternative means of enabling teachers to
access ICT resources and instruct the Council’s ICT Services to stop access to the
Education webmail service from personal devices
 Management should ensure that employees are completing the mandatory GDPR
modules
 Management should consider providing access to health and safety resources on the
employee website, MyCouncilWorks 
 Health and wellbeing documents and links available on MyCouncilWorks should be
reviewed to ensure it includes all information provided on the Hub intranet site 
15. Full details of the audit findings, recommendations and management responses can be found in
Section 3 of this report and in the action plan at Appendix 1.
2. Objectives and Summary Assessment
16. Exhibit 1 sets out the control objectives identified during the planning phase of the audit and our
assessment against each objective.
Exhibit 1 – Summary Assessment of Control Objectives 
Control Objective Link to Risk Assessment Summary Conclusion
CO1 Policies, procedures
and guidance are in
place for remote
working to ensure
Council’s data and
systems are safe
from unauthorised
access. 
SRR11
EDI ORR46
EDI ORR47
Substantial Policies and procedures are in place
and being followed with the
exception of Education Management
Circular 1.18 where parental consent
for internet access is no longer
obtained.  Accreditation for Cyber
Essentials Plus and Public Sector
Network has been renewed annually
for the corporate network indicating
that appropriate infrastructure and
software are in place to ensure
confidentiality, integrity and
availability of Council data,
improvements are planned to
mitigate risks to the security of the
Education network.  Training modules
have been made available to users of
Council provided devices and
reminders to be vigilant of phishing
emails are periodically issued. 
Teaching staff make use of the
Education Webmail service using
personal devices which is out with

Page 6

6 
Argyll and Bute Council – Internal Audit Report – ICT Remote Working, May 2022
the control of Council security
measures.  Survey results indicate
that overall performance of the ICT
service has remained high with the
Council ranked top in Scotland and
placed in the top quartile within the
UK.
CO2 Policies, procedures
and guidance are in
place for remote
working to ensure
Council’s
compliance with
GDPR. 
LRS ORR2
Audit Risk 1
Limited Procedures, guidance and learning
materials have been prepared and
made available to employees to
ensure compliance with GDPR,
however, only 21.4% of employees
have completed the learning modules
during 2021.  
CO3 Policies, procedures
and guidance are in
place for remote
working to ensure
the Council is
undertaking its duty
of care to ensure
health, safety and
wellbeing of its
employees. 
LRS ORR14 Substantial Health and Safety policy, procedures
and guidance have been prepared
and made available to employees on
the Council’s intranet site, the Hub,
however these are not available on
MyCouncilWorks.  Display screen
assessments are completed
periodically by employees, reviewed
by management and issues addressed
where possible.  A Wellbeing
Strategy, associated documentation
and learning materials have been
prepared, however there are some
inconsistencies in availability on the
Hub and MyCouncilWorks platforms. 
The Employee Assistance Programme
is successful with 9% of employees
accessing services provided and
surveys indicate positive feedback in
terms of wellbeing, working from
home and customer satisfaction. 
17. Further details of our conclusions against each control objective can be found in Section 3 of this
report.  
3. Detailed Findings
Policies, procedures and guidance are in place for remote working to ensure Council’s data and
systems are safe from unauthorised access. 
18. The Council has an up-to-date ICT acceptable use policy (AUP) in place that requires all
employees with a need to access the council’s networks, systems and communications devices
to complete the form in agreement that they will comply with the terms and conditions
outlined.  This agreement must be authorised by managers and submitted to ICT services prior
to access being arranged.  In addition, there is a social media policy with an application form and
other request forms for additional media and systems not covered in the AUP.

Page 7

7 
Argyll and Bute Council – Internal Audit Report – ICT Remote Working, May 2022
19. ICT services check that AUP forms are appropriately completed, signed and authorised prior to
creating the relevant user accounts including email, VPN, network and active directory to access
files stored on the Council’s network.    Access to specific systems is controlled by system
administrators and is arranged independently of ICT services.  Managers are delegated with
responsibility to ensure ongoing compliance with the AUP within their teams, non-compliance is
an HR matter and ICT may be asked to provide evidence to support disciplinary action.
20. A recent internal audit review tested AUPs, therefore a small sample of four APTC and four
Teachers was reviewed to ensure ongoing compliance, and these were found to have been
completed satisfactorily.  A sample of the same size of leavers was also tested to ensure
notifications of termination were promptly passed to ICT services and all ICT related user
accounts closed down, this was also found to be satisfactory.
21. When working from home, access to the Council’s network and systems is achieved through the
use of a Virtual Private Network (VPN) connection. On completion of the appropriate forms,
third parties such as system support contractors can also gain access via VPN by prior
arrangement for short periods of up to one week.
22. School pupils are expected to comply with the content of education management circular 1.18
‘Use of GLOW and internet’ and also their school handbook.  The circular advises that an
attached consent form should be completed and returned, however the form is no longer
included in the circular and we have been advised that it is not currently being used.  
23. The parental consent form was discontinued from use in 2018 as use of the internet and Glow
are considered to be integral to school life and there is no longer a need to ask for permission
from parents for their children to access standard education tools.  The School Handbook has
been updated to include acceptable use of these resources following consultation with the
Governance and Risk Manager, however, Education Management Circular 1.18 continues to
require a consent form to be completed.
Action Plan 3
24. Education provide ICT services with a list of pupils for whom an email account is to be created at
the start of each new academic year and this is used to access GLOW and the internet.  ICT are
notified when there is a change of circumstances requiring an account to be terminated or
information updated.
25. Cyber Essentials Plus is an effective Government backed scheme that helps protect against the
most common cyber-attacks.  The Council demonstrates a commitment to cyber security on its
corporate network through compliance with the elements contained in the published toolkit and
independent verification. Re-accreditation was achieved in November 2021.  The Council’s
education network is less robust as there are insufficient resources in schools to ensure the
criteria can be met.  Education Services are aiming to improve the security of their network and
are actively working on proposals to invest substantially to mitigate the risks.  
26. The Council’s corporate network links to the Public Services Network (PSN), the Governments
high-performance network which helps public sector organisations in Scotland work together,
reduce duplication and share resources.  The Council has maintained access to this network by
complying with the code of connection which entails a more stringent set of criteria than Cyber
Essentials Plus.

Page 8

8 
Argyll and Bute Council – Internal Audit Report – ICT Remote Working, May 2022
27. The PSN code of connection requires that an annual exercise takes place to assess the strength
of user passwords to ensure the network is protected against compromise.  A decision has been
made to increase the frequency of this exercise to twice yearly and has been assigned to the ICT
Security Officer for action.  In November 2021, a small number of system users were found to
have created weak passwords and were enforced by the system to change these to a stronger
password at next login.    
28. Laptops issued to users are encrypted and built to a standard specification that includes an
operating system and all of the necessary software to provide security and perform work tasks, if
any additional approved software is required, it can be added by prior arrangement.  Each laptop
provided by the Council has a unique certificate installed that is registered on the Council’s
network and verified as part of the user’s login process, unregistered devices will not be able to
connect to the network.  Additionally, connection can only be achieved using an on premise IP
address or via a valid VPN account from a remote location.  
29. Each user is required to have a valid active directory account created by ICT services with a
unique username and password to access the network, privileged users with additional access
rights require a further level of multi-factor authentication (MFA) and this is achieved by phone
call from ICT services.  
30. Local Authorities are at high risk of cyber-attacks, they are regularly targeted to gain
unauthorised access to the network and systems.  The Council receives many unauthorised
attempts which are notified to ICT services via the Firewall’s external threats report or network
perimeter security report, such access attempts are locked down or the device located and its
port of access closed.   ICT services will also monitor and investigate reports of attempted access
to internet facing systems on the firewall and intrusion detection system and suspicious internal
traffic flagged by it.  The anti-virus system generates an alert when a problem is identified and
the device is immediately removed from the network and recovered by desktop support staff for
analysis and cleaning.
31. Systems and processes are working well protecting the Council’s ICT infrastructure and assets,
however, cyber-attacks are increasing in both volume and complexity and there is no guarantee
that every attempt will be intercepted by the measures in place.  Users, therefore, must also be
vigilant and report suspicious activity on their systems or email traffic.  
32. Council staff are regularly reminded of the need to be vigilant via corporate emails and the
Council’s intranet site (Hub) banner contains a reminder regarding phishing attacks and provides
further information by following the link provided.  The Hub provides additional guidance and
self-help documents to assist employees with ICT related issues such as working from home tips,
password guidance and mobile device management.  The Council also operates a Learn Online
(LEON) platform which contains modules pertaining to, cyber security, social media awareness,
Stay safe online and GDPR.  
33. The Council does not operate a Bring Your Own Device (BYOD) policy, although a few systems
such as LEON are independent of the Council’s network and may be accessed from personal
devices.  
34. The majority of teaching staff do not have their own dedicated Council supplied device and
therefore make use of the Education Webmail application accessible from personal devices. 
There is no means of preventing download of information to the device being used and security
settings are out with the control of ICT services.

Page 9

9 
Argyll and Bute Council – Internal Audit Report – ICT Remote Working, May 2022
Action Plan 1 
35. To enable remote working, an employee must have a laptop computer with VPN software
installed and access to a broadband service as a minimum.  Laptops require to meet a minimum
specification standard to ensure they can cope with all the systems required and are therefore
purchased over the Scottish Government framework to achieve best value.  Occasionally laptops
are required to have additional specifications and these are purchased specially for the purpose
defined e.g. architects require additional graphics.  Other equipment can be provided as
required such as additional monitors, keyboards etc.
36. Prior to COVID-19 lockdown arrangements commencing on 23 March 2020 around 70% of
devices used across the Council were laptops, an additional 155 corporate laptops were issued
to those who used desktop computers to enable them to work from home.  Laptops will be the
default device purchased in future unless there are specialist reasons. 
37. There was no additional funding available to fund purchase of additional laptops, therefore the
155 laptops were drawn from those purchased under the laptop replacement programme for
2020 resulting in those due to be replaced being rescheduled to 2021.    Employees were able to
take home equipment such as monitors, keyboards etc. as required from the office in addition to
their laptop.  
38. VPNs were used mostly on an occasional basis prior to 23 March 2020 resulting in a requirement
for ICT services to create an additional 800 – 1,000 VPN accounts to enable users to work from
home on an ongoing basis.  A corporate email advised employees of VPN etiquette to ensure
sufficient bandwidth was available for all users and the Tactical group received regular reports to
monitor VPN usage and bandwidth capabilities.  Additional bandwidth was diverted to support
increased VPN usage and split tunnelling was implemented to enable access to MS365
applications out with the VPN environment in line with published guidance.  
39. All non-essential ICT developments and projects were paused at the initial response to COVID-19
to redeploy engineers on the service desk frontline to provide additional support,
communications assistance and build laptops for those who did not already have them.
40. The service desk extended its availability to 8am to 6pm to assist employees in the transition to
homeworking, however has now reverted to previous times as the demand for assistance
decreased.  Performance measures associated with the time taken to resolve issues reported to
the ICT service desk improved during this period and has been maintained.   
41. The Society for Innovation, Technology and Modernisation (SOCITM) conduct a benchmarking
survey every 2 years to compare our performance against other participating Government
organisations across Scotland and the UK, alternate years there is a customer satisfaction survey. 
The most recent benchmarking survey took place during 2019 when the Council achieved the
top score in Scotland and a top 10 place in the UK with a placing in the top quartile.  Customer
satisfaction has remained consistently high.
Policies, procedures and guidance are in place for remote working to ensure Council’s compliance
with GDPR
42. GDPR came into force on 25 May 2018 and as a result the Council has prepared a set of
procedures and guidance and made them available on the Hub for all members of staff to view. 
The Information Commissioners Office requires that training is in place to ensure compliance
with GDPR. Mandatory training and annual refresher modules have been prepared and made

Page 10

10 
Argyll and Bute Council – Internal Audit Report – ICT Remote Working, May 2022
available on LEON for employees with access to the Council’s network and systems to complete. 
The training modules are regularly reviewed and updated, the GDPR module must be completed
once and the refresher module must be completed annually.
43. The target is for 90% of employees with access to the Council’s network and systems to
complete the training.  ICT services have advised that there are 1,980 corporate user accounts
and 2,050 education user accounts, a report generated by Human Resources and Organisational
Development (HROD) indicates that in 2021, 342 employees have completed the GDPR module
and 520 have completed an annual refresher, this amounts to 21.4% of employees with a user
account therefore falling below the 90% target.
Action Plan 2  
44. Sensitive information stored on the Council’s network and systems is secure and accessible by
authorised employees via corporate and system specific security arrangements.  There is an
aspiration to maintain all records digitally in future, however, some hard copy files are still in use
e.g. Social Work.  Hard copy files are not removed from Council premises unless absolutely
necessary, this requires authorisation from senior management and a record of removal and
return is maintained.
Policies, procedures and guidance are in place for remote working to ensure the Council is
undertaking its duty of care to ensure health, safety and wellbeing of its employees
45. The Council’s Health and Safety Policy states that line managers are responsible for “doing all
that is reasonably practicable to ensure the health, safety and welfare of their staff and those
affected by their work activities” and “assessing risks and for making sure that the work controls
identified by risk assessments are implemented”.  The policy also states that employees must co-
operate.  A range of policy and guidance documents are available on the Hub for employees to
access, however, these are not available on the staff website “MyCouncilWorks”.
Action Plan 4
46. Display screen equipment (DSE) includes laptops, monitors and mobile devices and the risks
associated with prolonged and continuous use can be significant.  In line with service level
Health and Safety work plans, managers are required to ensure that employees undertake
periodic DSE assessments and confirm to senior management that these have been completed
and any issues raised that can be resolved have been addressed.  Occasionally issues raised will
be referred to health and safety and occupational health officers for additional assessment and
remediation.
47. The DSE form has been adapted for home working and will be further reviewed when hybrid
working arrangements are implemented.  A record of assessments completed, issues raised and
actions taken for one service was reviewed and found to comply with the requirements as set
out in the guidance.
48. A Wellbeing Strategy has been prepared for 2019-24, it refers to all aspects of the employee’s
life and is based on the three pillars of wellbeing, mental and emotional wellbeing, physical
wellbeing and financial wellbeing.  The strategy has been published on the Hub for all networked
staff to view, however, it is not available on MyCouncilWorks.

Page 11

11 
Argyll and Bute Council – Internal Audit Report – ICT Remote Working, May 2022
49. Policies, procedures, guidance and Information documents have been prepared and made
available to employees on the Hub and MyCouncilWorks to assist employees, however, some
links to information are missing on MyCouncilWorks and one link does not work.  
Action Plan 5
50. Nineteen learning modules have been prepared and made available to employees on LEON
covering a range of health and wellbeing topics.  
51. A weekly bulletin, “Wellbeing Wednesday” is prepared and published on MyCouncilWorks, each
issue contains information on a new topic, recognises global and national campaigns, and
highlights special causes or increase awareness of specific health and wellbeing topics.  
52. The Council offers access to an Employee Assistance Programme provided by Health Assured
consisting of a helpline operated by experienced counsellors, legal and financial specialists,
incident advice and support, an online health portal and smartphone app and regular counselling
and management support.  The uptake of services provided is in line with benchmarking
information.
53. Employee wellbeing surveys took place in June and October of 2020 and again in September
2021 with most employees rating their overall wellbeing in positive terms and were aware of
support measures available to them.  Some common themes for improvement were identified as
a result of the survey and have been addressed.
54. In November 2020, HR conducted a homeworking survey to gather feedback from managers to
assess their perceived level of success of homeworking arrangements.  Responses were received
from 159 managers who indicated positive results for communicating and maintain regular
contact with their team and supporting their team’s wellbeing, however responses were less
positive in terms of induction of a new team member.
55. Employee surveys also took place in November 2020 (912 responses) and May 2021 (886
responses).  Positive feedback was received from both surveys in terms of support provided by
managers and ease of working from home and 70% of respondents said they would be happy to
work from home three or more days per week.  
56. Customer feedback was also gathered at this time with 981 responses received.  Results were
positive indicating an overall high level of customer service satisfaction despite the COVID-19
restrictions.  
57. Following these surveys, managers were asked to gather information from their teams and
advise the Modern Workspace project team of the identified requirements in terms of returning
to the office, whether this be full time, hybrid or not at all.  The results indicate that 76.1% of
employees are satisfied with working from home and wish to continue to do so to some extent.
58. There were no specific actions addressed as a result of these surveys although a number of
themes were identified that will be taken forward within the “My Modern Workspace” project
and will be included in the soon to be finalised hybrid working policy.

Page 12

Appendix 1 – Action Plan 
No Finding Risk Agreed Action Responsibility / Due Date
High
1 Education Webmail 
The majority of teaching staff do not have their own
dedicated Council supplied device and therefore make use
of the Education Webmail application accessible from
personal devices.  There is no means of preventing
download of information to the device being used and
security settings are out with the control of ICT services.
High level of cyber
security risk to the
Council.
Failure to comply with
GDPR which may lead to
financial penalties and
reputational damage.
Education management
plan to instruct ICT
Services to stop access
to use of Education
webmail service from
personal devices once
an alternative means of
enabling teachers to
access ICT services has
been implemented.
Digital Lead – Education 
31 March 2023
High
2 GDPR Training and annual refresher 
21.4% of employees with a user accounts have completed
the mandatory or refresher GDPR modules in 2021, falling
below the target of 90%. 
Failure to comply with
GDPR which may lead to
financial penalties.
An email will be issued
to all networked
employees reminding
them of the
requirement to
complete the
mandatory or refresher
GDPR modules on LEON
by 31 March 2023.
Governance and Risk
Manager 
31 March 2023 
Low
3 Education Management Circular 1.18 – Use of Internet
and Glow 
The circular requires parental consent for pupils to access
the internet and GLOW, however, this form is no longer
required.  
Information for parents
provided on the
Council’s website is not
current.
Education Management
Circular 1.18 will be
updated to reflect
current requirements.
Digital Lead – Education 
31 August 2022

Page 13

13 
Argyll and Bute Council – Internal Audit Report – ICT Remote Working, May 2022 
No Finding Risk Agreed Action Responsibility / Due Date
Low
4 Health and Safety information 
Health and safety information available on the Hub is not
currently available on MyCouncilWorks for users with no
access to the Council’s network.
Council employees may
be unable to reference
policy and guidance
information where
access to the HUB is not
possible.
Health and Safety
Officer will liaise with
Communications Team
and arrange for relevant
information to be
replicated on
MyCouncilWorks.
Health and Safety Officer 
30 June 2022
Low
5 Wellbeing information 
The Wellbeing Strategy and some links to further guidance
and information are not provided on MyCouncilWorks and
one link does not work.  
Council employees may
be unable to obtain
relevant assistance
information where
access to the HUB is not
possible.
Wellbeing Strategy will
be added to the
MyCouncilWorks page
and the addiction link
repaired.   
Content of the
Wellbeing Pages on
MyCouncilWorks will be
reviewed as part of the
Wellbeing Work plan. 
This will be a rolling
piece of work to
gradually put all
relevant information
across.
HR Service Centre Team
Leader 
31 May 2022 
31 December 2022 
In order to assist management in using our reports a system of grading audit findings has been adopted to allow the significance of findings to be ascertained. 
The definitions of each classification are as follows:

Page 14

14 
Argyll and Bute Council – Internal Audit Report – ICT Remote Working, May 2022 
Grading    Definition
High  A major observation on high level controls and other important internal controls or a significant matter relating to the critical success of the
objectives of the system.  The weakness may therefore give rise to loss or error. 
Medium 
Observations on less significant internal controls and/or improvements to the efficiency and effectiveness of controls which will assist in meeting
the objectives of the system.  The weakness is not necessarily substantial however the risk of error would be significantly reduced if corrective
action was taken.  
Low  Minor recommendations to improve the efficiency and effectiveness of controls or an isolated issue subsequently corrected.  The weakness does
not appear to significantly affect the ability of the system to meet its objectives. 
VFM  An observation which does not highlight an issue relating to internal controls but represents a possible opportunity for the council to achieve
better value for money (VFM).

Page 15

15 
Argyll and Bute Council – Internal Audit Report – ICT Remote Working, May 2022
Appendix 2 – Audit Opinion 
Level of Assurance  Definition 
High 
Internal control, governance and the management of risk are at a high standard. Only marginal elements of residual risk have
been identified with these either being accepted or dealt with. A sound system of control designed to achieve the system
objectives is in place and being applied consistently. 
Substantial 
Internal control, governance and the management of risk is sound. However, there are minor areas of weakness which put some
system objectives at risk and specific elements of residual risk that are slightly above an acceptable level and need to be
addressed within a reasonable timescale. 
Reasonable 
Internal control, governance and the management of risk are broadly reliable. However, whilst not displaying a general trend,
there are areas of concern which have been identified where elements of residual risk or weakness may put some of the system
objectives at risk. 
Limited 
Internal control, governance and the management of risk are displaying a general trend of unacceptable residual risk above an
acceptable level and placing system objectives are at risk. Weakness must be addressed with a reasonable timescale with
management allocating appropriate resources to the issues raised. 
No Assurance 
Internal control, governance and the management of risk is poor. Significant residual risk and/or significant non-compliance with
basic controls exists leaving the system open to error, loss or abuse. Residual risk must be addressed immediately with
management allocating appropriate resources to the issues.