Democracy Spraffa

Agenda reports pack

Argyll and Bute Council · 15 September 2022
Back to Audit and Scrutiny Committee — 15 September 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD
8 September 2022 
NOTICE OF MEETING 
A meeting of the AUDIT AND SCRUTINY COMMITTEE will be held BY MICROSOFT TEAMS on
THURSDAY, 15 SEPTEMBER 2022 at 10:30 AM, which you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES 
2. DECLARATIONS OF INTEREST 
3. MINUTE OF PREVIOUS MEETING HELD ON 23 JUNE 2022 (Pages 5 - 12) 
AUDIT ITEMS 
4. INTERNAL AUDIT AND COUNTER FRAUD SUMMARY OF ACTIVITIES (Pages 13
- 20)  
Report by Chief Internal Auditor 
5. INTERNAL AND EXTERNAL AUDIT REPORT FOLLOW UP 2022-23 (Pages 21 -
52)  
Report by Chief Internal Auditor 
6. INTERNAL AUDIT REPORTS TO AUDIT AND SCRUTINY COMMITTEE 2022/23
(Pages 53 - 74)  
Report by Chief Internal Auditor 
 Education Management Allowance (EMA)
 HSCP – Workforce Planning 
7. EXTERNAL AUDIT UPDATE 
Verbal Update by Audit Scotland 
SCRUTINY ITEMS
Public Document Pack

Page 2

8. AUDIT AND SCRUTINY COMMITTEE ANNUAL REPORT 2021/22 (Pages 75 - 82)  
Report by Chair of Audit and Scrutiny Committee 
9. COUNTER FRAUD TEAM (CFT) ANNUAL REPORT AND UPDATE 2022 (Pages 83
- 88)  
Report by Chief Internal Auditor 
10. STRATEGIC RISK ASSURANCE MAPPING (Pages 89 - 104)  
Report by Chief Internal Auditor 
11. STRATEGIC RISK REGISTER (Pages 105 - 112)  
Report by Chief Executive 
12. CORPORATE COMPLAINTS ANNUAL REPORT 2021/22 (Pages 113 - 152)  
Report by Executive Director with responsibility for Legal and Regulatory Support 
13. FREEDOM OF INFORMATION - ANNUAL REPORT 2021-22 (Pages 153 - 162)  
Report by Executive Director with responsibility for Legal and Regulatory Support 
14. SCRUTINY - IDENTIFICATION AND ASSESSMENT OF TOPICS 2022-23 (Pages
163 - 166)  
Report by Chief Internal Auditor 
REPORTS FOR NOTING 
15. WORKPLAN (Pages 167 - 170)  
For noting and updating 
EXEMPT REPORT FOR DECISION 
16. WASTE STRATEGY UPDATE 
Report by Executive Director with responsibility for Roads and Infrastructure Services  
(a) Covering Report by Executive Director with responsibility for Roads and
Infrastructure Services (Pages 171 - 172)
E1  (b) Report by Executive Director with responsibility for Roads and
Infrastructure Services presented to Environment, Development and
Infrastructure Committee on 1 September 2022 (Pages 173 - 182)
.
The Committee will be asked to pass a resolution in terms of Section 50(A)(4) of the Local
Government (Scotland) Act 1973 to exclude the public for items of business with an “E” on the
grounds that it is likely to involve the disclosure of exempt information as defined in the
appropriate paragraph of Part I of Schedule 7a to the Local Government (Scotland) Act 1973. 
The appropriate paragraph is:- 
E1 Paragraph 6 
Information relation to the financial or business affairs of any particular person (other than the
authority).

Page 3

Audit and Scrutiny Committee 
Martin Caldwell (Chair) Councillor Daniel Hampsey
Councillor Graham Hardie Councillor Mark Irvine
Councillor Reeni Kennedy-Boyle Councillor Jim Lynch (Vice-Chair)
Councillor Andrew Vennard   
Shona Barton, Committee Manager 
Contact: Lynsey Innis, Senior Committee Assistant; Tel:  01546 604338

Page 4

This page is intentionally left blank

Page 5

MINUTES of MEETING of AUDIT AND SCRUTINY COMMITTEE held BY MICROSOFT TEAMS 
on THURSDAY, 23 JUNE 2022 
Present: Martin Caldwell (Chair) 
Councillor Daniel Hampsey
Councillor Graham Hardie
Councillor Mark Irvine 
Councillor Reeni Kennedy-Boyle
Councillor Andrew Vennard 
Attending: Jane Fowler, Head of Customer Support Services
Paul MacAskill, Chief Internal Auditor
Moira Weatherstone, Interim Chief Internal Auditor
Shona Barton, Committee Manager
David Forshaw, Finance Manager
Iain Jackson, Governance and Risk Manager
Kyle McAulay, Audit Scotland 
Gordon McAllister, Audit Scotland 
In order to facilitate officer attendance, the Chair moved and the Committee agreed to
vary the order of business.  This minute reflects the order in which discussion took place.  
.
1. APOLOGIES 
The Chair welcomed everyone to the meeting, and advised that due to technical
difficulties, a decision had been taken to hold the meeting by Microsoft Teams. 
Apologies were intimated on behalf of Councillor Jim Lynch. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest intimated.   
3. MINUTE OF PREVIOUS MEETING HELD ON 15 MARCH 2022 
The Minute of the previous meeting of the Audit and Scrutiny Committee, held on 15
March 2022 was approved as a correct record. 
4. COUNCIL 6-MONTH PERFORMANCE REPORT - OCTOBER TO MARCH 2022 
Consideration was given to a report which presented the Council’s 6-month Performance
Report and Scorecard for October to March 2022 focussing on key performance
indicators.   
Decision 
The Audit and Scrutiny Committee:- 
Page 5 Agenda Item 3

Page 6

1. Noted that this report presented the Council performance on strategic activities across
all services; 
2. Reviewed and scrutinised the Council’s 6-month Performance Report and Scorecard; 
3. Noted that the Strategic and Area Committees have responsibility to scrutinise
operational performance; and 
4. Noted the planned activity for Performance Management and Reporting during
2022/23 onwards. 
(Reference:  Report by Executive Director with responsibility for Customer Support
Services, dated 23 June 2022, submitted) 
5. LOCAL GOVERNMENT BENCHMARKING FRAMEWORK 2020/21 - ANALYSIS
AND COMMENTARY 
The Committee gave consideration to a report which presented the final Local
Government Benchmarking Framework (LGBF) 2020/21 data for Argyll and Bute which
included ‘How We Performed’ and ‘Expected Future Performance and Impact of Policy
Decisions’ commentary from Heads of Service.   
Decision 
The Audit and Scrutiny Committee: 
1. Considered the contents of the report for scrutiny activity and performance reporting
purposes; and 
2. Noted that the completed LGBF 2020/21 is published on our website as part of the
Council’s statutory Public Performance Reporting duty.   
(Reference:  Report by Executive Director with responsibility for Customer Support
Services, dated 23 May 2022, submitted) 
6. INTERNAL AUDIT AND COUNTER FRAUD SUMMARY OF ACTIVITIES 
The Committee gave consideration to a report providing a summary of Internal Audit
activity and progress during quarter one of 2022/23 against the following areas: 
Audits Completed 
 Civil Contingencies
 Climate Change Act
 Complaints Handling – HSCP
 ELC Parental Satisfaction
 ICT – Remote Working
 Planning Applications 
 School Fund Governance 
Audits in Progress 
Page 6

Page 7

 Heritage Assets
 EMA
 Workforce Planning (HSCP) 
The report also included information on the work carried out by the Counter Fraud Team
(CFT) and provided an update on total billing to date as a direct consequence of their work
at the end of April 2022.   
Decision 
The Audit and Scrutiny Committee agreed to note and endorse the Summary of Activities
report.   
(Reference:  Report by Interim Chief Internal Auditor, dated 23 June 2022, submitted) 
7. INTERNAL AND EXTERNAL AUDIT REPORT FOLLOW UP 2021-22 
The Committee gave consideration to a report providing an update on all open actions as
at 31 March 2022, including information on actions where the agreed implementation date
had been rescheduled. 
Decision 
The Audit and Scrutiny Committee agreed to endorse the contents of the report. 
(Reference:  Report by Interim Chief Internal Auditor, dated 23 June 2022, submitted) 
8. INTERNAL AUDIT REPORTS TO AUDIT AND SCRUTINY COMMITTEE
2021/2022 
The Audit and Scrutiny Committee gave consideration to a report containing the action
plans in relation to the following 7 audits:- 
 Civil Contingencies
 Climate Change Act
 ELC Parental Satisfaction
 ICT – Remote Working
 Planning Application
 School Fund Governance
 Complaints Handling – HSCP 
Decision 
The Audit and Scrutiny Committee agreed to note and endorse the summary report and
detail within each individual report. 
(Reference:  Report by Interim Chief Internal Auditor, dated 23 June 2022, submitted) 
9. EXTERNAL AUDIT UPDATE REPORT 
Page 7

Page 8

Consideration was given to a verbal update from Audit Scotland which outlined the interim
work carried out for the 2022 Audit of the Council; the progress made in terms of Best
Value work to ensure that arrangements are in place to secure financial sustainability; the
planned work for the commencement of the financial statement preparations and
arrangements and the process of the Annual Accounts.  It was also noted that Mazars
would be taking over as the new Auditors following the completion of the Annual Accounts
process, and Audit Scotland would continue to liaise closely with them to ensure a smooth
transition. 
Decision 
The Audit and Scrutiny Committee agreed to note the verbal update provided. 
(Reference:  Verbal Update by Audit Scotland) 
10. REVISED 2022/23 INTERNAL AUDIT ANNUAL PLAN 
Consideration was given to a report which presented the revised Internal Audit Annual
Plan for 2022/23. 
Decision 
The Audit and Scrutiny Committee agreed and approved the revised Internal Audit Annual
Plan 2022/23 (Appendix 1). 
(Reference:  Report by Interim Chief Internal Auditor, dated 23 June 2022, submitted) 
11. VERBAL UPDATE BY CHAIR(S) OF THE SCRUTINY PANEL 
Having noted the apologies for Councillor Jim Lynch, Martin Caldwell, Chair of the
Community Asset Transfer Review Panel advised that he would talk to the following items
relating to the Community Asset Transfer Scrutiny Review and the Fly-tipping Scrutiny
Review. 
12. COMMUNITY ASSET TRANSFER SCRUTINY REVIEW 
The Committee gave consideration to a report presenting the findings of the Community
Asset Transfer Scrutiny Review, which was carried out as per the 2021/22 scrutiny plan.  
The report identified ‘a perception that the Council’s current asset transfer process is
complex and does not fully support community empowerment to allow community groups
to progress transfer request without significant support’.   
Discussion was had in relation to the opportunity this afforded to expose the opportunities
of Community Asset Transfer to a wider audience, with it being noted that delegated
authority for Asset Transfers lies with the Policy and Resources Committee.   
Decision 
The Audit and Scrutiny Committee:- 
1. Agreed the draft Community Asset Transfer Scrutiny Report; and 
Page 8

Page 9

2. Agreed that the Community Asset Transfer Scrutiny Report be presented to the
Council’s 4 Area Committees in the first instance, for information and to facilitate
promotion to community groups to consider, noting that any recommendations arising
would require to be referred to the Policy and Resources Committee for consideration.   
(Reference:  Report by Chair of the Community Asset Transfer Scrutiny Panel, dated 23
June 2022, submitted)   
13. FLY-TIPPING SCRUTINY REVIEW 
The Committee gave consideration to a report presenting the findings of the Fly-tipping
Scrutiny Review, which was carried out as per the 2021/22 scrutiny plan.   
Discussion was had in relation to the relationship between the volume of fly-tipping
complaints and the request for special uplifts, with it being agreed that there was an
opportunity to see if a link could be established.  The absence of information relating to
the Fly-tipping Scotland app which was introduced in 2015 was also discussed, with the
Committee agreeing that this report was still a work in progress.   
Decision 
The Audit and Scrutiny Committee:- 
3. Noted that the draft Fly-tipping Scrutiny Report is a work in progress; and 
4. Requested that the Chair of the Fly-tipping Scrutiny Review Panel consider the
information discussed and determine the best way to proceed in order to progress the
initial piece of work undertaken. 
(Reference:  Report by Chair of the Community Asset Transfer Scrutiny Panel, dated 23
June 2022, submitted)   
14. LOCAL GOVERNMENT IN SCOTLAND - FINANCIAL OVERVIEW 2020-21 
Consideration was given to a report which presented the recent Local Government
Financial Overview 2020-21 report by the Accounts Commission and highlighted relevant
matters which included comments on the Council’s income in 2020-21; the Council’s
financial position at the 2020-21 year end and the financial outlook for councils in 2021-22.   
Decision 
The Audit and Scrutiny Committee agreed to note the contents of the Accounts
Commission report.   
(Reference:  Report by Interim Head of Financial Services, dated 7 June 2022, submitted)   
15. EXTERNAL AUDIT 2021/22 MANAGEMENT REPORT 
It was noted that this item was covered as part of the verbal update provided by Audit
Scotland in relation to the External Audit Update.   
16. LOCAL GOVERNMENT IN SCOTLAND - OVERVIEW 2022 
Page 9

Page 10

The Committee gave consideration to a report by Audit Scotland which reported on the
impact of Covid-19 on local government; the progress towards recovery and renewal;
managing resources; managing the workforce and actions and recommendations for
leadership within councils.  The report also included information on meeting local needs;
the impact of Covid-19 on services and inequality; collaboration and communities and
actions and recommendations for leadership going forward.   
Decision 
The Audit and Scrutiny Committee agreed to note the contents of the report.   
(Reference:  Report by Audit Scotland, submitted) 
17. STRATEGIC RISK REGISTER 
Consideration was given to a report providing an update on the Council’s Strategic Risk
Register (SRR).   
Decision 
The Audit and Scrutiny Committee agreed to endorse the updated SRR at Appendix 1 of
the report.   
(Reference:  Report by Chief Executive, dated 23 June 2022, submitted)   
18. INTERNAL AUDIT - ANNUAL REPORT 2021/22 
Consideration was given to a report advising of the work undertaken by Internal Audit in
respect of the Annual Audit Plan 2021/22 and the contents of the Interim Chief Internal
Auditor’s (CIA) independent annual opinion on the effectiveness of the Council’s risk
management, internal control and governance processes.   
Decision 
The Audit and Scrutiny Committee endorsed the content of the report and the associated
annual opinion of the Interim Chief Internal Auditor. 
(Reference:  Report by Interim Chief Internal Auditor, dated 23 June 2022, submitted) 
19. REVIEW OF CODE OF CORPORATE GOVERNANCE 
The Committee gave consideration to a report advising that the Code of Corporate
Governance Action Plan 2021/22 has been reviewed and updated along with the content
of the code to reflect the governance position within the Council for 2020/21.  It also noted
that the review allows the Council to include a statement of governance and internal
control in the Annual Accounts for 2021/22. 
Decision 
The Audit and Scrutiny Committee:- 
1. Noted the updates in the Action Plan for 2021/22; 
Page 10

Page 11

2. Considered and approved the content of the revised Code of Corporate Governance
for 2021/22; 
3. Considered and approved the content of the Action Plan for 2022/23; and 
4. Considered and approved the draft statement of governance and internal control for
2021/22. 
(Reference:  Report by Executive Director with responsibility for Legal and Regulatory
Support, dated 23 June 2022, submitted) 
20. UNAUDITED FINANCIAL ACCOUNTS 
The Committee gave consideration to a report presenting an overview of the Unaudited
Annual Accounts for 2021-22 and a summary of the significant movements from 2021-22. 
The report also provided information on the revenue outturn for 2021-22. 
Decision 
The Audit and Scrutiny Committee considered the Unaudited Annual Accounts for the
year ended 31 March 2022.   
(Reference:  Report by Section 95 Officer, dated 17 June 2022, submitted)   
21. WORKPLAN 
In order to facilitate forward planning of reports to the Audit and Scrutiny Committee,
Members considered the outline Audit and Scrutiny Committee workplan.   
Decision 
The Audit and Scrutiny Committee agreed to note the outline workplan.   
(Reference:  Audit and Scrutiny Committee workplan, dated 23 June 2022, submitted) 
The Chair took the opportunity to thank the Interim Chief Internal Auditor, Moira
Weatherstone for her help and assistance following the departure of the previous Chief
Internal Auditor, Laurence Slavin noting that Moira was leaving the Council and wishing
her all the best for the future.  He also welcomed the new Chief Internal Auditor, Paul
MacAskill to the organisation and advised that he was looking forward to working with him
in the months to come.    
.
Page 11

Page 12

This page is intentionally left blank

Page 13

ARGYLL AND BUTE COUNCIL  AUDIT & SCRUTINY COMMITTEE   
FINANCIAL SERVICES  15 SEPTEMBER 2022  
INTERNAL AUDIT  AND COUNTER FRAUD SUMMARY OF ACTIVITIES 
1. SUMMARY  
1.1 The objective of the report is to provide the Audit and Scrutiny Committee (the
Committee) with a summary of Internal Audit activity and progress during
quarter two of 2022/23.  
1.2 Core activities together with a progress update statement are shown below: 
 2022/23 Audit Plan progress: On track subject to available resources
being in place for the full period of the approved plan. 
 Individual Audits undertaken: Two audits have been completed during
the period. One audit(s) have been assessed as providing high assurance,
none as substantial assurance, one reasonable assurance and none as
limited assurance (HSCP Audit provided for information only). 
 Counter Fraud: The Counter Fraud team is continuing to rebill council tax
accounts and recovery of funds is underway.  All other aspects and referrals
are being considered, investigated and evaluated and the Counter Fraud
Team remain vigilant to protect our public purse. 
 Continuous Monitoring Programme Testing: A number of auditable units
are subject to continuous testing. Management have responded to previous
quarter notifications and there are no outstanding issues. 
 Performance indicators: Current status is green / on track.  
2. RECOMMENDATIONS  
2.1 To review and endorse the Summary of Activities report.  
3. DETAIL  
3.1 Two audits have been completed since the previous Committee in June
2022. Eight audits are currently in progress and will be reported to a future
meeting of the Committee. 
Audits Completed 
 Education Maintenance Allowance (EMA)
 Workforce Planning (HSCP) – For Information Only 
Page 13 Agenda Item 4

Page 14

Audits in Progress 
 Early Years
 Heritage Assets
 Performance Management (HSCP) – For Information Only
 Externally Funded Projects
 Management of Debt & Debt Recovery
 Private Sector Grants & Housing Adaptations
 Performance Management (HSCP)
 Directions (HSCP)  
3.2 In addition to those already in progress indicative audits planned for Quarter 3
2022/23 are:  
3.3 2022/23 Audit Plan 
 Procurement
 Customer Service Centre
 Payroll
 Building Standards
 Oban Airport
 Client Funds
 Learning and Physical Disability Care Packages
 Events Management  
3.4 The audit of Car Parking Facilities has been postponed, the audit was to
review the policies, procedures and compliance for the management of car
parking fees.  An internal review is currently in progress and the service is in
a transitional stage, the Chief Internal Auditor assessed the situation and
considered that an audit in this area would add more value once the
recommendations from the internal review have been fully implemented.  The
verification review of LEADER funding has also been removed from the plan. 
This review was to provide assurance that the submission for funding was
accurate.  The audit has been removed due to completion of the LEADER
programme and the Council not being included in the sample selected by
Scottish Government for final review.  A verification review of Education
Maintenance Allowance (EMA) has been added to the 2022/23 plan to assess
compliance with the Scottish Government’s guidelines.  This was formerly
reviewed by Audit Scotland, however, responsibility has now passed to the
Council and an annual review will be included in future audit plans.  No further
audits have been identified as replacements as there has been additional time
expended by officers assisting with External Quality Assessment (EQA)
preparation and systems development.   
Scrutiny  
3.5 Work has been completed on the 2021/22 scrutiny plan.  Scrutiny topics for the
2022/23 plan will be discussed by committee Members at today’s meeting with
work to commence following agreement.     
Page 14

Page 15

Counter Fraud  
3.6 The CFT is progressing well with both team members now fully CIPFA
accredited fraud investigators. Continued routine work is required to be able to
accurately track the full income recovered from the team’s work, however,
based on the amount of additional billing, even accounting for a degree of non-
recovery, the indications are that they are easily exceeding target. In addition
they are raising awareness of the Council’s zero tolerance to fraud and this will
act as a deterrent to fraud being perpetrated in the first place. Crucially, if no
Counter Fraud team had been in place then the reported instances of fraud
would still be taking place at a cost to the Council and public purse. Given the
success of the pilot, the Executive Leadership Team (ELT) met in July 2022
and agreed to make these posts permanent.  
3.7 Current total rebilling sits at £778,341.  Current total recovered from this is
£618,100.  This provides a recovery percentage of just over 79%.
There has been a total of 46 referrals made through the reporting channels
within 2022.  Four referrals within council tax have been upheld with a
recovery of approx. £4,000.
The other agenda item outlines the full CFT bi-annual billing that was provided
to the ELT.   
Additional Updates from Quarter One  
3.8 Staff continue to work from home and this has proved to be successful; where
on-site visits have been required due to the specific nature of the audit work to
be undertaken, these visits have occurred in accordance with any guidance
that was in place.  
3.9 The Public Sector Internal Audit Standards (PSIAS) require the Council’s
Chief Internal Auditor (CIA) to develop a Quality Assurance and
Improvement Programme (QAIP). The purpose of the QAIP is to enable the
evaluation of internal audit’s conformance to the PSIAS. The QAIP must
include annual internal self-assessments with a five yearly external
assessment, carried out by an independent assessor.  A programme of five
yearly reviews has been prepared by the Scottish Local Authorities Chief
Internal Auditors Group (SLACIAG) and these will be conducted by peer
review, Argyll and Bute Council has been scheduled for review in September
2022 by East Dunbartonshire Council.  This review will commence shortly
and a report will be submitted to a future meeting of this committee.  The
annual self-assessment is not required due to the external assessment
taking place and will resume in 2023 with a report submitted to this
committee in September 2023.    
3.10 A sample of data in respect of the Statutory Performance Indicators (SPI’s)
that are required to be returned by councils as part of the Local Government
Benchmarking Framework (LGBF) must be reviewed by Internal Audit for
submission to the Improvement Service by 31 August each year.  Internal audit
carry out this work in collaboration with colleagues in performance
management and a separate report will be submitted for review at this
committee.  Internal Audit was provided with the full set of data from which to
select indicators for review on 16 June and as large variances were reported in
attendance figures for sport and leisure management, library visits and
Page 15

Page 16

museums services these indicators were selected for review.   Refuse
collection was also selected for review as there was a large variance in the
number of premises for collection and it had not been reviewed since 2015. 
There were also large variances in the figures presented for sickness absence,
however, these figures were found to be comparable with those submitted
prior to the pandemic and therefore no further analysis performed as pervious
reviews found the data collection process to be robust.   Errors were identified
during the course of the review and amended by the relevant officers.  The
pro-forma has been updated to reflect the correct figures for submission to the
Improvement Service.   
Continuous Monitoring  
3.11 Our continuous monitoring programme is generally focused on transactional
type activity. Standard audit tests are applied which are relevant to each
auditable unit. Control design tests look at whether the controls in place
adequately address the potential risk event. There have been no findings
within the quarter that require to be reported.  
3.12 A follow up process is in place whereby management are advised of
continuous monitoring findings and, where appropriate, requested to take
remedial action.  There are currently no outstanding follow-up points arising
from previous testing.  Due to the volume of continuous monitoring tests
carried out the decision was made to report by exception only.     
National Reports  
3.13 A follow up process for national reports is in place whereby management are
advised of national reports published and asked to confirm what, if any, action
is planned as a result of the report.  Table 2 details the national reports issued
during quarter one 2022/23.  
Table 2: National Reports 
National
Report
Issued
To
Detail Management response/ Action
taken
Scotland’s
financial
response to
Covid-19
Chief
Executive
The Scottish
Government moved at
pace with its partners
to respond financially
to the pandemic. But
public sector leaders
need to be clearer
about how one-off
Covid-19 funding is
being spent and what
impact it has had.
 ELT notes the report and
recommendations and note
that the Council has also
provided reports on Covid
funding and will give further
consideration to the
recommendations on further
transparency.
 ELT will remain alert to
learning from external
resources and will continue to
review these as they arise.
 HSCP Chief Officer will share
report with Head of Finance/
Transformation for HSCP as
recommendations are equally
Page 16

Page 17

relevant to integrated
authorities.
Best Value
Assurance
Review
Angus
Council
Chief
Executive
Angus Council serves
its communities well,
has made impressive
improvements to
services in recent
years and benefits
from effective
leadership and a clear
vision. There is strong
partnership working
and collaboration to
help deliver services
that benefit local
people.
There are no specific actions to be
taken in response to the content of
this report which will be submitted
to ELT for information.
Fraud and
Irregularity
2021/22
Counter
Fraud
Team
A summary of the
cases of fraud and
other irregularities at
public bodies reported
by external auditors
for the financial year
2021/22.
 The Council has a dedicated
Counter Fraud Team (CFT)
and are part of SLAIG.  There
is regular contact with Police
Scotland, NFI and NAFN
 Plans/Policy were prepared at
commencement of the CFT
and updated following review
recommendations received
 Head of Financial Services
and Communications Team
have been contacted to review
controls in response to
ongoing threats
 Our controls are considered to
be robust in line with last
year’s Audit Scotland
communication and have been
reviewed this year using the
same criteria.  
 The CFT maintain regular
contact with ICT services who
inform staff of any upcoming
malware, software or phishing
threats via internal
newsflashes.  There are IT
training modules on the
Council’s e-learning platform
as well as recently published
security emails and short
training videos. 
Page 17

Page 18

National Fraud Initiative (NFI)  
3.14 NFI data matching involves comparing computer records held by one body
against other computer records held by the same or another body to identify
potentially fraudulent claims and payments to be identified. Note though that
the inclusion of personal data within a data matching exercise does not mean
that any specific individual is under suspicion. Where a match is found it
indicates that there may be an inconsistency which requires further
investigation. No assumption can be made as to whether there is fraud, error
or other explanation until an investigation is carried out.  A reminder process is
in place to ensure that matches are reviewed on a timely basis.  
3.15 The most recent cycle of NFI activity has now been concluded with the new
data set due to be available in January 2023. Therefore the usual table update
on matches progressed has been removed as there has been limited activity
since the last committee.  The table updating the committee on matches
progressed will be reinstated from the March 2023 meeting of the Committee
onwards.   
Internal Audit Development  
3.16 The table below details progress against the action points in our Internal Audit
development plan.  All items have been addressed and no additional items
have been added in quarter one.  
Table 4: Internal Audit Development Key Actions: 
Area For
Improvement
Agreed Action Progress
Update
Timescale 
Nothing outstanding.   
3.17 Internal Audit scorecard data is available on pyramid. The indicators reported
are aligned to those for internal audit in the Financial Services service plan.  All
indicators are shown as on currently being on track.  
Page 18

Page 19

Internal Audit Team Scorecard 2022– 23 – FQ1 22/23 (as at June 2022)
BO115 We Are Efficient And Cost Effective    
Internal Audit Level of Satisfaction
Actual  100% G 
Target 80%
Review of Strategic Risk register
Status Complete G 
Target Complete
Percentage of audit plan completed
Status 100% G 
Target 100%
Percentage of audit recommendations accepted by
management
Actual  100%
G
Target 100% 
4 CONCLUSION  
4.1 The 2022/23 audit plan is on track and the Counter Fraud Team is continuing
with visits and pro-active work throughout Argyll and Bute.  
5 IMPLICATIONS
5.1 Policy - Internal Audit continues to adopt a risk based approach to activity
5.2 Financial –None
5.3 Legal –None
5.4 HR – None
5.5 Fairer Scotland Duty – None
5.5.1 Equalities – None
5.5.2 Socio-Economic Duty – None
5.5.3 Islands Duty – None
5.6 Climate Change – None 
5.7 Risk – None
5.8 Customer Service – None 
For further information please contact Internal Audit (01546 604146)
Paul Macaskill
Chief Internal Auditor
15 September 2022
Page 19

Page 20

This page is intentionally left blank

Page 21

ARGYLL AND BUTE COUNCIL  AUDIT AND SCRUTINY COMMITTEE                                                            
FINANCIAL SERVICES  15 SEPTEMBER 2022 
INTERNAL AND EXTERNAL AUDIT REPORT FOLLOW UP 2022-23 
1.0 INTRODUCTION 
1.1 Internal and external audit reports include an action plan with a
management response establishing the agreed action, timescale and
responsible officer. Internal Audit record these in a database and, on a
monthly basis, follow them up to ensure they are being progressed. 
1.2 This report updates the committee on all open actions as at 30 June 2022
including information on actions where the agreed implementation date
has been rescheduled. 
2.0 RECOMMENDATIONS 
2.1 To endorse the contents of the report. 
3.0 DETAIL 
3.1 The two tables below provide a numerical summary of open audit actions
with a split between actions due by and due after 30 June 2022. 
Table 1 – Actions due by 30 June 2022 
DMT/Service Complete Delayed/
Rescheduled
No
Response
Evidence
Required
Total
Internal Audit
CE – Financial
Services
4 4 0 0 8
DH – Commercial
Services
1 1 0 0 2
DH – Legal &
Regulatory 
1 3 0 0 4
DH – Lifelong
Learning &
Support
0 1 3 0 4
KF – Customer
Support Services
2 3 0 0 5
KF – Development
& Economic
Growth
1 0 0 0 1
Page 21 Agenda Item 5

Page 22

KF – Roads &
Infrastructure
Services
3 7 0 2 12
H&SCP (IJB) –
Finance &
Transformation
2 0 0 0 2
H&SCP (IJB) –
Strategic Planning
& Performance
2 0 0 0 2
H&SCP (SW) –
Adult Services
(Mental Health
Learning Disability,
Addictions &
Lifelong
Conditions)
0 1 0 0 1
H&SCP (IJB) –
Adult Services
(Older Adults &
Community
Hospitals) 
0 1 0 0 1
LiveArgyll 1 0 0 0 1
External Audit      
TOTAL 17 21 3 2 43 
Table 2 – Actions due after 30 June 2022 
DMT/Service Complete Delayed/
Rescheduled
No
Response
On
Course
Evidence
Required
Total
Total
Internal Audit
CE – Financial
Services
0 2 0 3 0 5
DH –
Commercial
Services
0 0 0 5 0 5
DH – Learning
& Teaching
0 0 0 3 0 3
DH – Legal &
Regulatory 
0 0 0 2 0 2
DH – Lifelong
Learning &
Support
0 0 0 2 0 2
KF – Customer
Support
Services
0 0 0 4 0 4
KF –
Development
& Economic
2 0 0 1 0 3
Page 22

Page 23

Growth
KF – Roads &
Infrastructure
Services
0 1 0 3 0 4
H&SCP (IJB) –
Adult Services
(Older Adults
& Community
Hospitals) 
0 0 0 3 0 3
H&SCP (IJB) –
Finance/Transf
ormation
2 0 0 1 0 3
H&SCP (IJB) –
Strategic
Planning and
Performance
0 1 0 0 0 1
H&SCP (SW)
– Adult
Services
(Mental Health
Learning
Disability,
Addictions &
Lifelong
Conditions)
0 0 0 1 0 1
H&SCP (SW)
– Children &
Families and
Criminal
Justice
1 0 0 0 0 1
H&SCP (SW)
– Strategic
Planning &
Performance
0 0 0 1 0 1
External Audit       
TOTAL 5 4 0 29 0 38 
3.2 Appendix 1 provides further detail on actions that have either been delayed
and rescheduled or for which Internal Audit have received no response
from the service to inform this follow up. 
4.0 CONCLUSION 
4.1 COVID19 continues to impact on the progress services are making to
complete audit action points. 
Page 23

Page 24

5.0 IMPLICATIONS 
5.1 Policy - None
5.2 Financial - None
5.3 Legal - None
5.4 HR - None
5.5 Fairer Scotland Duty - None
5.5.1 Equalities – None
5.5.2 Socio-Economic Duty – None
5.5.3 Islands Duty - None
5.6 Climate Change – None
5.7 Risk –None 
5.8 Customer Service – None 
Paul MacAskill
Chief Internal Auditor
15 September 2022                                                  
For further information contact: Paul MacAskill, 01546 604108
Paul.macaskill@argyll-bute.gov.uk 
APPENDICES
Appendix 1 – Action Plan Points with No Response and Delayed & Rescheduled
Page 24

Page 25

Appendix 1 - Action Plan Points with No Response & Delayed and Rescheduled 
No Response 
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer 
LIFELONG
LEARNING &
SUPPORT - PUPIL
WORK
PLACEMENTS
Training 
There is no
training
programme to
support officers
involved in the
work placement
programme
including
ensuring
appropriate steps
are taken to
determine
whether a PVG
check is required.
Medium Conduct a training
needs analysis with
school staff leading
on work placements. 
Produce a
programme of
centrally run CPD
opportunities for
next academic year
(or include in
Education Service
Training
Programme).
30 September 21
31 December 21
30 June 22
No Response Head of
Education -
Support &
Lifelong
Learning
LIFELONG
LEARNING &
SUPPORT - PUPIL
WORK
PLACEMENTS
Self-evaluation 
Education
Scotland provides
a benchmarking
exercise which
schools can
undertake as part
of a self-
evaluation
exercise. This
provides a check
list on how things
Low CPD session to be
held on
benchmarking tool
for school staff. 
Introduce an annual
benchmarking
exercise for all
secondary schools.
31 December 21
30 June 22
No Response Head of
Education -
Support &
Lifelong
Learning
Page 25

Page 26

No Response 
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer 
are being
undertaken
against the
requirements of
the Standard.
Schools have not
completed this
exercise.
LIFELONG
LEARNING &
SUPPORT - PUPIL
WORK
PLACEMENTS
Reporting 
There are no
periodic
management
reports on pupil
work placements.
These would form
an important
understanding of
the success and
challenges of
work placements
and facilitate
discussions about
how to overcome
some of the
barriers which are
resulting in a
decreasing pool
of employers
signing up to the
scheme.
VFM Identify and agree
meaningful KPIs for
new service plan,
monitoring and
reporting. Implement
new KPI data
collection in schools.
Establish robust
reporting framework
including EMT and
CSC.
30 June 22 No Response Head of
Education -
Support &
Lifelong
Learning
Page 26

Page 27

Action Plan Points Due by 30 June 2022 – Delayed & Rescheduled/Evidence Required
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer 
FINANCIAL
SERVICES - 
FIXED ASSET
REGISTER (AIRS)
Reconciliation of
AIRS to General
Ledger 
General Ledger
reports are
provided at year
end to facilitate
reconciliation of
assets to AIRS.
There is no
evidence of the
reconciliation
exercise being
reviewed for
accuracy by a
senior member of
staff.
LOW Reconciliation to be
signed off by
Finance Manager
annually.
30 June 22
31 August 22 
A match between
the AIRS and
Concerto Systems
was undertaken at
year end 21/22
which surfaced a
number of
differences between
the two systems.
Work has been done
to address the
differences but a
second system
match is required to
ensure that there are
no remaining errors
between the two
systems. This will be
done during late July
2022 with any
differences followed
up and resolved by
the end of August
2022. 
Delayed and
Rescheduled
Finance Manager
FINANCIAL
SERVICES - 
Inappropriate
authorisation of
transactions The
MEDIUM The wording of the
current monthly
email to cardholders
30 June 22
31 October 22
Delayed and
Rescheduled
Creditors
Supervisor/Creditors
Support Officer
Page 27

Page 28

Action Plan Points Due by 30 June 2022 – Delayed & Rescheduled/Evidence Required
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer 
PURCHASING
CARDS
Support Officer in
the creditors’ team
approves a
considerable
number of pre-
authorised
transactions for
catering staff and
procurement staff.
Furthermore
creditors will also
approve any
outstanding
transactions for
other departments
to ensure that the
bank direct debit is
completed within
agreed timeframes.
and approvers will
be updated to
remind them of their
responsibilities.
Once available, a
one page
procurement guide
will be issued to all
purchase card
holders and
approvers.
FINANCIAL
SERVICES
SYSTEMS -
INTERFACES &
RECONCILIATIONS
General Ledger
Reconciliations
There is no
reconciliation
performed between
the source system
and the general
ledger for
ResourceLink,
PECOS, Concerto
and Tranman and
the SEEMiS
interface for
MEDIUM Data in the source
system may not be
accurately reflected
in the general
ledger.
31 March 21
31 December 21
30 June 22
30 September 22 
Further work to be
completed to
produce a report
from Resource Link
and the new Oracle
Fusion system so
that the two systems
can be reconciled.   
Delayed and
Rescheduled
Resourcelink -
Pensions & Payroll
Officer
Page 28

Page 29

Action Plan Points Due by 30 June 2022 – Delayed & Rescheduled/Evidence Required
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer 
clothing grants.
COMMERCIAL
SERVICES
SYSTEMS -
INTERFACES &
RECONCILIATIONS
General Ledger
Reconciliations
There is no
reconciliation
performed between
the source system
and the general
ledger for
ResourceLink,
PECOS, Concerto
and Tranman and
the SEEMiS
interface for
clothing grants.
MEDIUM Data in the source
system may not be
accurately reflected
in the general
ledger.
31 March 21
30 September 21
31 December 21
30 June 22
31 December 22
Dialogue continues
with Strategic
Finance following
the update to Oracle
Fusion, the limited
availability of
Licenses and what
reports can be
generated. 
Delayed and
Rescheduled
Concerto - Property
Design Manager
LIFELONG
LEARNING &
SUPPORT - 
ADDITIONAL
SUPPORT NEEDS
Format of Child
Plans 
The Council do not
use a standard
format for child
plans however this
will be addressed
when all plans are
recorded on
SEEMiS. However
sample testing
highlighted that
plans do not
always include a
next review date.
LOW As child plans are
reviewed over the
coming school
session 2019-20
they will be
converted onto the
Well-being App
format, this format
contains a “Date of
Next review “field. 
Schools will be
supported to change
all plans to the new
format within the
Well-being App by
Area Principal
Teachers.  During
30 September 20
31 December 20
30 June 21
30 June 22
30 September 22
Using the drill down
facility on the Well-
being app to monitor
the number of plans
is only showing the
number of plans that
are complete.  Since
schools keep plans
open while they are
working on them this
is not a true
reflection of all the
plans that are on the
system.  The
education data team
and the ESOs have
a date planned to
Education Officer
Page 29

Page 30

Action Plan Points Due by 30 June 2022 – Delayed & Rescheduled/Evidence Required
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer 
the year there will be
checks to see how
many plans have
been converted and
to check if the date
of review field has
been completed.
amend the training
materials to ensure it
clear to staff in
schools how to mark
the plans as
complete.  Further
training sessions will
be scheduled in the
new academic
session. In the MAKI
area 61% of schools
are showing as
having plans on the
WBA.  In the H+L
area 62% of schools
have plans on the
WBA.  In B+C 81%
of schools have
plans on the WBA. 
In the OLI area 65%
of the schools have
plans on the WBA.
Further training and
individual support
will be offered to
Head Teachers by
the I+E ESOs in the
coming school
session to help them
to transfer more
plans onto the WBA. 
Page 30

Page 31

Action Plan Points Due by 30 June 2022 – Delayed & Rescheduled/Evidence Required
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer 
Delayed and
Rescheduled
CUSTOMER
SUPPORT
SERVICES - 
ICT Remote
Working 
Wellbeing
information  
The Wellbeing
Strategy and some
links to further
guidance and
information are not
provided on
MyCouncilWorks
and one link does
not work.
HIGH Wellbeing Strategy
will be added to the
MyCouncilWorks
page and the
addiction link
repaired.
31 May 22
31 August 22
Vacancies within the
team have delayed
implementation of
this action. This will
be completed in
August. 
Delayed and
Rescheduled
HR Service Centre
Team Leader
CUSTOMER
SUPPORT
SERVICES
ORGANISATIONAL
CULTURE & 2019 -
EMPLOYEE
SURVEY ACTION
PLAN
Involvement in
change
N/A Use new approach
of online exit
questionnaires to
help identify root
causes for
departures and
assess the potential
additional benefit of
exit interviews.
31 March 20 
31 December 20
31 March 21
30 September 21
31 March 22
1 June 22
Final testing is
underway for the
new approach and
process maps are
being redrawn to
include a link to the
new online exit
questionnaire.
Target date for
implementation is
August 2022. 
Delayed and
Rescheduled
Head of Customer
Support Services
ROADS &
INFRASTRUCTURE
SERVICES
CONTRACT
MANAGEMENT -
Contract
Monitoring
Monitoring of
contracts has not
been undertaken
HIGH Contract manager to
be identified for each
contract, key dates
to be agreed
including pre-start
30 June 22
30 September 22
N+S have set up the
contracts and Ops
are now managing
same. 
Operations Manager
and Network and
Standards Manager
Page 31

Page 32

Action Plan Points Due by 30 June 2022 – Delayed & Rescheduled/Evidence Required
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer 
ROADS AND
AMENITY
SERVICES
as required by the
‘Contract and
Supplier
Management
Toolkit’,
specifically: : · no
contract managers
have been
identified · contract
and Supplier
management plans
have not been
completed · formal
supplier review
meetings have not
been undertaken ·
key performance
indicators have not
been identified ·
contracts have not
been subject to
formal annual
review and risk
assessments
and review meeting,
KPIs to be
developed which
include formal
annual review and
risk assessment.
Delayed and
Rescheduled
ROADS &
INFRASTRUCTURE
SERVICES
CONTRACT
MANAGEMENT -
ROADS AND
AMENITY
SERVICES
Roles and
Responsibilities 
No clearly defined
roles and
responsibilities
have been
identified for
HIGH Contract manager to
be identified for each
contract which will
work to the contract
monitoring
requirements
detailed in action
plan number 1.
30 June 22
30 September 22
Delayed and
Rescheduled
Operations Manager
and Network and
Standards Manager
Page 32

Page 33

Action Plan Points Due by 30 June 2022 – Delayed & Rescheduled/Evidence Required
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer 
contract monitoring
between the
Network and
Standards services
and Operational
Services within
Development and
Infrastructure.
ROADS &
INFRASTRUCTURE
SERVICES
CONTRACT
MANAGEMENT -
ROADS AND
AMENITY
SERVICES
Performance
Reporting 
No formal
performance
monitoring and
reporting
arrangements are
in place for any of
the 20 contracts
currently in
operation.
MEDIUM As detailed in action
1 and 2 above, the
designated contract
manager will be
responsible for all
performance
monitoring and
reporting for specific
contracts.
30 June 22
30 September 22
Delayed and
Rescheduled
Operations Manager
and Network and
Standards Manager
ROADS &
INFRASTRUCTURE
SERVICES - 
STREET
CLEANING
Partnership
Agreement 
Oban Business
Improvement
District (BID) has
agreed to fund an
additional seasonal
street sweeper
employed by the
Council. The street
sweeper has been
HIGH Formalise
arrangements with
Oban BID for the
funding of the
seasonal street
sweeper
30 April 22
30 September 22
Delayed and
Rescheduled
Operations
Manager, Roads &
Infrastructure
Services
Page 33

Page 34

Action Plan Points Due by 30 June 2022 – Delayed & Rescheduled/Evidence Required
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer 
appointed through
the Council’s
recruitment
process, however
no formal
agreement is in
place and income
from BID has not
been received.
ADULT SERVICES
(MENTAL HEALTH
LEARNING
DISABILITY,
ADDICTIONS &
LIFELONG
CONDITIONS/CSW
O)
H&SCP - IMPACT
OF NEW
LEGISLATION
NMAHP
Implementation
Group reporting 
The NMAHP
Implementation
Group is
accountable to the
NMAHP Workforce
Planning &
Development
Group, which in
turns reports to
NMAHP
Professional
Leadership
Committee and the
Programme Board. 
Risk 
There is a risk that
compliance with
HIGH Recommendation 
The NMAHP
Implementation
Group should
provide a work plan
and update reports
to the NMAHP
Workforce Planning
& Development
Group in accordance
with its Terms of
Reference. Required
actions arising from
the reports should
be clearly recorded
on the NMAHP
Implementation
Group’s action plan. 
Management Action. 
The NMAHP
31 May 21
30 June 22
There are staffing
pressures
throughout the NHS
so no point in
implementing safe
staffing legislation
when there are not
enough qualified
staff in the economy
to comply with it. 
Delayed and
Rescheduled
Lead Nurse -
Contact 
Page 34

Page 35

Action Plan Points Due by 30 June 2022 – Delayed & Rescheduled/Evidence Required
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer 
the Staffing Act is
not being
monitored and
reported on with
sufficient
frequency, and
appropriate actions
are not being taken
where necessary. 
The NMAHP
Implementation
Group’s Terms of
Reference states
that the group will
provide an annual
work plan and bi-
monthly update
reports to the
NMAHP Workforce
planning &
development group
in respect of: 
• Adherence to the
Common Staffing
Methodology 
• Completion of
establishment
reviews (following
SOP for
Implementation
Group has been
disbanded. All
actions will be
picked up by the
NMAHP Oversight
Group. This group
will report on actions
to the IJB to provide
the requisite
assurance.
Page 35

Page 36

Action Plan Points Due by 30 June 2022 – Delayed & Rescheduled/Evidence Required
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer 
establishment
reviews) for all
clinical areas with
access to validated
tools by February
2020 
• Develop schedule
for annual tool run
to be implemented
from 2020 
• Development of a
Risk Register 
• Development of
an Issues Log 
• Monitoring
monthly any
change to current
establishments 
However, whilst
some oral updates
have been
provided at
meetings of the
NMAHP Workforce
Planning &
Development
Group, the reports
Page 36

Page 37

Action Plan Points Due by 30 June 2022 – Delayed & Rescheduled/Evidence Required
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer 
have not been
provided to the
group.
FINANCIAL
SERVICES - 
PURCHASING
CARDS
Procurement
procedures Forty
five purchase
cardholders (25%)
were invited to take
part in a survey,
with twenty nine
responses
received. The
responses received
highlighted a
general lack of
awareness of
procurement
procedures.
MEDIUM A review of the
guidance for spend
within the lowest
threshold of £0-£999
will be undertaken
and a one page
procurement guide
will be produced for
issue to all purchase
card holders and
approvers.
30 June 22
30 September 22
Partially completed.  
Discussions have
been completed with
the majority of Head
Teachers as the bulk
of purchase card
spend is within the
schools.   This has
helped us
understand why they
are using the cards
in the first place (and
not PECOS) to
ensure the new
guidance addresses
these issues.  
Remaining meetings
to be completed on
return from school
summer holidays
and guidance note
circulated &
appended to the
council’s
procurement
manual.     
Delayed and
Rescheduled
Category
Management
Officer/Procurement
& Contract
Management Team
Page 37

Page 38

Action Plan Points Due by 30 June 2022 – Delayed & Rescheduled/Evidence Required
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer 
LEGAL &
REGULATORY
SUPPORT -
INFORMATION
ASSET
REGISTERS
Periodic Review
and Agreement of
Information Asset
Registers 
For four of the 12
IARs there was no
evidence they had
been agreed by the
relevant DMT.
Furthermore IARs
need to be
reviewed to ensure
they are aligned to
the new Corporate
structure. The RMP
requires that IAR’s
should have a
complete action
plan to document
required changes.
Two of the 12 IARs
had an action plan,
two had action
plans that did not
fully meet the
requirements of the
RMP and eight had
no action plan.
MEDIUM Obtain annual
approval from DMTs
for all completed
IARs
30 September 20
31 March 21
30 September 21
31 December 21
30 June 22
31 December 22
Delayed and
Rescheduled
Governance, Risk &
Safety Manager
LEGAL &
REGULATORY
SUPPORT - 
Periodic Review
and Agreement of
Information Asset
MEDIUM Action plans for all
IARs to be put in
place and agreed by
30 September 20
31 March 21
30 September 21
Delayed and
Rescheduled
Governance, Risk &
Safety Manager
Page 38

Page 39

Action Plan Points Due by 30 June 2022 – Delayed & Rescheduled/Evidence Required
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer 
INFORMATION
ASSET
REGISTERS
Registers 
For four of the 12
IARs there was no
evidence they had
been agreed by the
relevant DMT.
Furthermore IARs
need to be
reviewed to ensure
they are aligned to
the new Corporate
structure. 
The RMP requires
that IAR’s should
have a complete
action plan to
document required
changes. Two of
the 12 IARs had an
action plan, two
had action plans
that did not fully
meet the
requirements of the
RMP and eight had
no action plan.
management teams 31 December 21
30 June 22
31 December 22 
LEGAL &
REGULATORY
SUPPORT - 
INFORMATION
Information Asset
Registers 
The two Social
HIGH Social Work IARs to
be completed and
approved by
appropriate
31 December 20
30 June 21
30 September 21
31 December 21
Delayed and
Rescheduled
Governance, Risk &
Safety Manager
Page 39

Page 40

Action Plan Points Due by 30 June 2022 – Delayed & Rescheduled/Evidence Required
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer 
ASSET
REGISTERS
Work IARs were
not available for
review or located
on the designated
SharePoint site. Of
the remaining ten,
four require to be
updated to reflect
the latest GDPR
requirements. 
Clarity over
whether the Live
Argyll IAR comes
under the remit of
the Governance,
Risk & Safety
Manager’s
responsibility is
required.
management teams 30 June 22
31 December 22
CUSTOMER
SUPPORT
SERVICES - 
SICKNESS
ABSENCE 
Attendance Review
Meetings 
Procedures
stipulate that
attendance review
meetings should be
carried out by the
employee’s line
manager to
facilitate the
employees return
Medium HR will review the
mechanism for
documenting content
of attendance review
meetings and
recommend a
preferred option for
automatically
populating the
documentation into
the MyView system. 
31 December 21
30 April 22
30 June 22
31 October 22 
Delayed and
Rescheduled
HR Development
Team Lead 
Page 40

Page 41

Action Plan Points Due by 30 June 2022 – Delayed & Rescheduled/Evidence Required
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer 
to work. No
evidence of review
meetings being
carried out was
available for any of
a sample of eight
long term
absences.
Procedures should
be updated to
ensure that all
attendance review
meetings are
properly recorded
in the MyView
system in the same
way that return to
work interviews are
recorded in
MyView.
ROADS &
INFRASTRUCTURE
SERVICES - 
WARDEN
SERVICES 
Warden Service
Coverage 
The four
environmental
wardens that are
expected to cover
the whole of the
Council area,
including the
islands, are not
geographically
High Consider
opportunities to
either restructure/
review overall
service delivery to
provide additional
warden cover or
alternatively look to
generate additional
income to facilitate
additional FTEs and
a more equitable
30 June 2022
31 December 22 
It has been agreed
that the Warden
Service is
transferring to N & S
and will be
combined with the
Car Parking
wardens and also
the staycation
wardens, this will
provide additional
resilience and better
Operations
Manager, Roads &
Infrastructure
Services 
Page 41

Page 42

Action Plan Points Due by 30 June 2022 – Delayed & Rescheduled/Evidence Required
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer 
spread to ensure
there is efficient
cover across the
four Council
administration
areas. In particular,
since 2018, there
has been no
warden based in
the MAKI area
which has resulted
in: 
· disproportionately
low level of warden
service in MAKI
compared to the
other
administrative
areas 
· where work is
required in MAKI
the majority of the
warden’s time is
spent commuting
rather than
delivering the
required services. 
spread of resource. 
This will help inform
any input into the
2022 budget
process. 
coverage of the area
and also working
towards a 7 day
warden service for
all taks once training
has been completed. 
Delayed and
Rescheduled 
ROADS &
INFRASTRUCTURE
Second Bin
Service Verification
HIGH Review the process
for:
30 June 22
30 September 22
Further to
discussions with the
Operations
Manager, Roads &
Page 42

Page 43

Action Plan Points Due by 30 June 2022 – Delayed & Rescheduled/Evidence Required
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer 
SERVICES -
WARDEN
SERVICES 
Wardens are
expected to verify
the veracity of
applications from
customers for a
second domestic
bin service. This
requires the
warden to confirm
that information
provided by the
customer is
accurate and
meets the defined
criteria. The
information
provided to
substantiate an
application can be
very personal and
sometimes of a
sensitive medical
nature. Wardens
have been asked
to provide this
service but have
received no formal
training in how to
ensure a
customer’s dignity
is maintained or to 
· Dealing with
requests for new
and replacement
bins. 
Governance, Risk
and Safety Manager
it has been
suggested that the
review of the
process considers
that the service take
the customers at
their word when they
make the application
and provide the
second bin without
any further checks,
and for the assisted
uplift only check that
the distance from
the kerb is under 30
metres.   
Delayed and
Rescheduled 
Infrastructure
Services
Page 43

Page 44

Action Plan Points Due by 30 June 2022 – Delayed & Rescheduled/Evidence Required
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer 
ensure they are
aware of the
requirements of
General Data
Protection
Regulation (GDPR)
in relation to
personal data for
this specific
process. 
Due to the
sensitivity of this
process, and the
potential risks
associated with
data protection it is
recommended that
the current
verification process
is reconsidered to
determine if it is
appropriate to
maintain it in its
current form. If it is
decided it should
be retained then
there should be
engagement with
the Council’s
Governance and
Risk Manager to
Page 44

Page 45

Action Plan Points Due by 30 June 2022 – Delayed & Rescheduled/Evidence Required
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer 
ensure it is being
carried out in full
compliance with
GDPR.
ROADS &
INFRASTRUCTURE
SERVICES - 
STREET
CLEANING 
Recharging for
sweeping of
Council car parks 
The Council’s
income generating
car parks are
recharged for
street sweeping
according to
information
retained in work
schedules rather
than actual work
taking place,
additionally the
Council’s non-
income generating
car parks are not
recharged for
sweeping.
VFM Ensure that timely
and accurate
recharges are
carried out and a
system in place to
ensure that this is
regularly taking
place. 
31 March 22
30 June 22
30 September 22 
Discussions are
ongoing with N & S
colleagues with
regards to the
frequency of street
sweeping for car
park maintenance. 
A reduction in
frequency at certain
locations has been
agreed and the work
schedules are being
amended and an
indicative value will
be given to N & S for
their approval. 
Delayed and
Rescheduled 
Operations
Manager, Roads &
Infrastructure
Services 
Adult Services
(Older Adults &
Community
Hospitals) HSCP –
Care Programme
Approach
CPA Procedures 
There are no
agreed CPA written
procedures,
including client
assessment
High Processes and
procedures will be
developed across
Argyll & Bute to
improve consistency
and ensure service
provision is
30 June 22
31 December 22
Not complete. CPA
post has been out to
advert however did
not attract any
applicants on this
occasion, being re-
advertised.
Consultant Nurse
Page 45

Page 46

Action Plan Points Due by 30 June 2022 – Delayed & Rescheduled/Evidence Required
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer 
processes, to
ensure a consistent
approach to CPA
service provision
across the HSCP.
appropriate across
the region. This is
subject to the
recruitment of key
posts within the
service which are
currently vacant. 
Delayed and
Rescheduled 
Action Plan Points Due After 30 June 2022 - Delayed & Rescheduled/Evidence Required
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer /
Status
FINANCIAL
SERVICES -
CAPITAL
MONITORING
Capital Programme
Planning &
Management
Guide The
Council’s Capital
Guide has not
been revised since
2018 and requires
a review to ensure
it reflects current
working practices
and provides
appropriate support
to officers involved
in the capital
monitoring
process. The
Council is currently
developing a new
MEDIUM Capital Planning and
Management Guide
to be updated once
the Capital Strategy
has been approved
to ensure the two
are aligned and
provide clarity.
31 March 22
30 September 22
31 December 22
This cannot be completed
until the Capital Strategy is
complete which the Head
of Commercial Services
has advised will be
towards the end of the
calendar year. 
Delayed and
Rescheduled
Head of
Commercial
Services/Finan
ce Manager
Page 46

Page 47

Action Plan Points Due After 30 June 2022 - Delayed & Rescheduled/Evidence Required
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer /
Status
Capital Strategy
which is to be
presented to the
Policy and
Resources
Committee in
August 2021 and
we recognise that a
review of the Guide
should be
conducted after the
Strategy has been
finalised to ensure
the two documents
complement each
other and. The
Guide could also
benefit from being
linked to, or
referencing, other
relevant Council
processes, in
particular the
Project
Management
section on the Hub.
FINANCIAL
SERVICES - 
FOLLOWING THE
PUBLIC POUND
Guidance on
Following the
Public Pound
(FtPP) Although
the Council has an
HIGH Following the Public
Pound guidance will
be drafted to provide
a consistent
approach to
30 June 20
31 December 20
30 June 2021
31 December 21
30 September 22
This cannot be completed
until the Capital Strategy is
complete which the Head
of Commercial Services
has advised may be
Head of
Financial
Services
Page 47

Page 48

Action Plan Points Due After 30 June 2022 - Delayed & Rescheduled/Evidence Required
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer /
Status
approved process
to manage external
funding requests it
is limited in detail,
is not closely
aligned to the Code
of Guidance on
Funding External
Bodies and
Following the
Public Pound and
there is a general
lack of awareness
amongst officers
that it exists. Audit
testing identified a
number of areas of
good practice
within the Council
and overall
compliance with
the principles of
FtPP however
there were
examples of
inconsistent
practice. A more
comprehensive
guidance
document should
be established
managing the award
of external funds.
31 December 22 towards the end of the
calendar year. 
Delayed and
Rescheduled
Page 48

Page 49

Action Plan Points Due After 30 June 2022 - Delayed & Rescheduled/Evidence Required
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer /
Status
which provides a
more standardised
and tiered
approach providing
greater clarity over
roles and
responsibilities and
standardised
templates for key
stages in the
process including
funding
assessments and
post award
monitoring and
reporting. The audit
team researched a
number of
examples of FtPP
guidance which
had been created
by other councils
during the planning
phase of the audit
and can make
these available to
inform the creation
of an Argyll and
Bute equivalent.
Page 49

Page 50

Action Plan Points Due After 30 June 2022 - Delayed & Rescheduled/Evidence Required
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer /
Status
ROADS &
INFRASTRUCTURE
SERVICES - 
FLEET
MANAGEMENT 
Management of
Pool Cars A high
level analysis of
the use of pool
cars suggests the
Council could
generate
considerable
savings through
more efficient use
of pool cars. Fleet
Services should
explore this further
via a more detailed
review which
should consider the
potential benefits
of: · a more
centralised
approach to the
administration and
booking of pool
cars 
· better promotion
of the use of pool
cars 
· providing greater
visibility of
bookings and
VFM The pool car module
will be released
through Tranman.
The pool car module
offers a centralised
approach to
bookings and
visibility. The
Council’s internal
communications
department will be
contacted to
highlight the use of
the pool cars. Work
will be undertaken to
increase usage. 
30 September 20
31 December 20 
30 June 21
31 December 21
30 April 22
29 July 22 
On-going delay in
implementation due to
staff absence and staff
training for temporary
posts. New
implementation date
September. 
Delayed and
Rescheduled 
Procurement/T
echnical
Officer 
Page 50

Page 51

Action Plan Points Due After 30 June 2022 - Delayed & Rescheduled/Evidence Required
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer /
Status
destinations to
encourage pool car
sharing 
· implementing or
developing a pool
car booking system 
· identifying ways
of transferring the
balance of pool car
usage from shorter
journeys to longer
ones 
Strategic Planning
and Performance –
HSCP – Risk
Management –
Risk Management
Training
There is no formal
proactive
programme of risk
management
training. Whilst we
understand some
training has been
provided where
requested by the
Clinical
Governance
Manager (and
tailored to whom it
is being delivered)
there is no
requirement for
Medium A formal programme
of risk management
training should be
developed and
delivered to all key
personnel involved
in the management
of risk. 
30 June 21
30 June 22
30 December 22
Development sessions
have been held with
groups of staff which
included raising
awareness of the risk
register process and
support to update
registers. The aim now is
to offer sessions to each
Head of Service and their
direct reports to review
their service registers and
agree the process by
which they will keep their
service registers current.
These sessions include
Clinical
Governance
Manager
Page 51

Page 52

Action Plan Points Due After 30 June 2022 - Delayed & Rescheduled/Evidence Required
Service / Report Finding Priority Agreed Action Dates Comment Responsible
Officer /
Status
Risk Leads to have
training and
training records are
not maintained.
There is also no
dedicated training
programme in
place for new
members of the IJB
or Audit
Committee, such
as within induction
training.
full training in use of the
risk registers, the risk
register process, the types
of risks that should be
recorded and escalation of
risks Due to two members
of the Clinical Governance
Team leaving end of May
resourcing this work is
very challenging, leading
to timescales slipping,
therefore it is suggested
that this is revised to the
end of March 2023. 
Delayed and
Rescheduled 
Page 52

Page 53

ARGYLL AND BUTE COUNCIL  AUDIT AND SCRUTINY COMMITTEE 
FINANCIAL SERVICES  15 SEPTEMBER 2022 
INTERNAL AUDIT REPORTS TO AUDIT AND SCRUTINY COMMITTEE 2022/2023 
1. EXECUTIVE SUMMARY 
1.1 There are two audits being reported to the Audit and Scrutiny Committee.     
1.2 The table below provides a summary of the conclusions for the audits performed.
The full reports are included as appendices to this report. 
Audit Name Level of
Assurance
High
Actions
Medium
Actions
Low
Actions
VFM
Actions
Education
Maintenance
Allowance
High 0 0 0 0
Workforce Planning –
HSCP (Part of the
HSCP Internal Audit
Plan and presented for
information only)
Reasonable 1 0 0 0 
1.3 Internal Audit provides a level of assurance upon completion of audit work. A
definition for each assurance level is documented in each audit report. 
2. RECOMMENDATIONS 
2.1 Audit and Scrutiny Committee to review and endorse this summary report and the
detail within each individual report. 
3.  DETAIL 
3.1 A high level summary of each completed audit report is noted below: 
Education Maintenance Allowance (EMA): This audit has provided a high level
of assurance.  This means that internal control, governance and the management
of risk are at a high standard. Internal audit confirm that the grant claim for 2021-
22 for EMA is fully compliant with the SG guidelines document TGM-EMA-21. 
Workforce Planning – HSCP (for information): This audit has provided a
reasonable level of assurance subject to the intimation by relevant officers that
this workforce plan will be submitted in time to the Scottish Government in July
2022. This means that internal control, governance and the management of risk
are broadly reliable. However, whilst not displaying a general trend, there are
areas of concern which have been identified where elements of residual risk or
weakness may put some of the system objectives at risk. 
4. CONCLUSION 
Page 53 Agenda Item 6

Page 54

4.1 Management has accepted each of the reports submitted and have agreed
responses and timescales in the respective action plans. 
5. IMPLICATIONS 
5.1 Policy - None
5.2 Financial - None
5.3 Legal - None
5.4 HR – None
5.5 Fairer Scotland Duty - None
5.5.1 Equalities – None
5.5.2 Socio-Economic Duty – None
5.5.3 Islands Duty – None
5.6 Climate Change – None 
5.7 Risk - None
5.8 Customer Service – None 
Paul Macaskill
Chief Internal Auditor
15 September 2022 
For further information contact: 
Paul Macaskill, Chief Internal Auditor
Tel:  01546 604108
Email: paul.macaskill@argyll-bute.gov.uk 
APPENDICES 
1. Education Maintenance Allowance (EMA)
2. HSCP – Workforce Planning
Page 54

Page 55

Argyll and Bute Council
Internal Audit Report
July 2022
FINAL 
High Medium Low VFM
Number of
Findings
0 0 0 0 
Education Maintenance
Allowance-Verification Audit
Audit Opinion: High 
Page 55

Page 56

2 
Argyll and Bute Council – Internal Audit Report – EMA Verification audit, July 2022 
Contents 
1. Executive Summary ........................................................................................................................ 3
Introduction ............................................................................................................................................ 3
Background ............................................................................................................................................. 3
Scope ....................................................................................................................................................... 3
Risks ........................................................................................................................................................ 3
Audit Opinion ......................................................................................................................................... 4
2. Objectives and Summary Assessment ........................................................................................... 4
3. Detailed Findings ............................................................................................................................ 4
Appendix 1 – Audit Opinion ................................................................................................................... 7 
Contact Details 
Internal Auditor: David Sullivan 
Telephone:  01546 604125 
e-mail:   david.sullivan@argyll-bute.gov.uk 
www.argyll-bute.gov.uk
Page 56

Page 57

3 
Argyll and Bute Council – Internal Audit Report – EMA Verification audit, July 2022
1. Executive Summary
Introduction
1. As part of the 2021/22 internal audit plan, approved by the Audit & Scrutiny Committee in
March 2022, we have undertaken an audit of Argyll and Bute Council’s (the Council) system of
internal control and governance in relation to Education maintenance Allowance (EMA)
Verification.
2. The audit was conducted in accordance with the Public Sector Internal Audit Standards (PSIAS)
with our conclusions based on discussions with council officers and the information available at
the time the fieldwork was performed. The findings outlined in this report are only those which
have come to our attention during the course of our normal audit work and are not necessarily
all the issues which may exist.  It is the responsibility of management to determine the extent of
the internal control system appropriate to the Council.
3. The contents of this report have been agreed with the appropriate council officers to confirm
factual accuracy and appreciation is due for the cooperation and assistance received from all
officers over the course of the audit.
Background
4. The Education Maintenance Allowance (EMA) programme offers means-tested financial support
of up to £1,560 each year to encourage eligible young people from low income households to
remain in non-advanced post-compulsory education. The education may be provided in schools,
at home, or in the community. It therefore includes young people not enrolled at school who
agree to take part in a programme which helps them to become ready for formal learning.
5. Eligibility for EMA payments depends on the young person's age, household income, and
residency, as well as the validity of the course. Argyll and Bute Council manages the delivery of
the EMA programme in respect of schools, home education, and all other learning.
6. EMA payments comprise a weekly allowance of £30 and are made by the council to eligible
young people. The Scottish Government (SG) reimburses the costs incurred by the council
through monthly payments of grant. There is also a statement of the total monthly amounts
submitted after the end of the year. An allowance for the costs of administering the programme
is also paid by the SG.
7. The SG have published technical guidelines namely TGM-EMA-21 to support auditors in the
verification of EMA claims.
Scope 
8. The scope of the audit was to assess that the Council is fully compliant with the Scottish
Government guidelines document TGM-EMA 21.
Risks
9.  The risks considered throughout the audit were:  
Page 57

Page 58

4 
Argyll and Bute Council – Internal Audit Report – EMA Verification audit, July 2022
 Audit Risk 1 – The Council fails to comply with the Scottish Governments document TGM-
EMA-21
Audit Opinion
10. We provide an overall audit opinion for all the audits we conduct. This is based on our
judgement on the level of assurance which we can take over the established internal controls,
governance and management of risk as evidenced by our audit work.  Full details of the five
possible categories of audit opinion is provided in Appendix 1 to this report.
11. Our overall audit opinion for this audit is that we can take a high level of assurance.  This means
that, internal control, governance and the management of risk are at a high standard. Only
marginal elements of residual risk have been identified with these either being accepted or dealt
with. A sound system of control designed to achieve the system objectives is in place and being
applied consistently.
2. Objectives and Summary Assessment
12. Exhibit 1 sets out the control objectives identified during the planning phase of the audit and our
assessment against each objective.   
Control Objective Link to Risk Assessment Summary Conclusion
1 The Council is fully
compliant with the
Scottish
Government
guidelines TGM-
EMA-21
Audit Risk 1 High Internal audit confirm that the grant
claim for 2021-22 for EMA is fully
compliant with the SG guidelines
document TGM-EMA-21. 
13. Further details of our conclusions against each control objective can be found in Section 3 of this
report.  
3. Detailed Findings
The Council is fully compliant with the Scottish Government guidelines TGM-EMA-21
14. The Councils arrangements for the completion of the year end statement are adequate. All
relevant parts of the year end statement have been completed including certification of the
statement by the section 95 officer.
15. Internal audit confirmed that the entries on the year-end statement agreed back to the total
monthly claims.
16. A total of 204 students were eligible for EMA payments in 2021-22. A random sample of 10
records was chosen from the database and the following checks were made as regards the
eligibility criteria as specified with the Scottish Government guidelines namely eligibility in
regard to:
 Proof of age
 Income criteria
 Residency in Scotland
Page 58

Page 59

5 
Argyll and Bute Council – Internal Audit Report – EMA Verification audit, July 2022
 Valid course undertaken
 Learning agreement of activity received
 Attendance at courses confirmed 
17. A review of the evidence supplied confirmed that all records examined were fully consistent
with the eligibility criteria specified within the Scottish Governments guidelines document TGM-
EMA. 
18. Internal Audit confirmed that the additional administration cost of £3,105 recovered from the
SG was consistent with the scheme requirements.   
Page 59

Page 60

In order to assist management in using our reports a system of grading audit findings has been adopted to allow the significance of findings to be ascertained. 
The definitions of each classification are as follows: 
Grading    Definition
High  A major observation on high level controls and other important internal controls or a significant matter relating to the critical success of the
objectives of the system.  The weakness may therefore give rise to loss or error. 
Medium 
Observations on less significant internal controls and/or improvements to the efficiency and effectiveness of controls which will assist in meeting
the objectives of the system.  The weakness is not necessarily substantial however the risk of error would be significantly reduced if corrective
action was taken.  
Low  Minor recommendations to improve the efficiency and effectiveness of controls or an isolated issue subsequently corrected.  The weakness does
not appear to significantly affect the ability of the system to meet its objectives. 
VFM  An observation which does not highlight an issue relating to internal controls but represents a possible opportunity for the council to achieve
better value for money (VFM). 
Page 60

Page 61

7 
Argyll and Bute Council – Internal Audit Report – EMA Verification audit, July 2022
Appendix 1 – Audit Opinion 
Level of Assurance  Definition 
High 
Internal control, governance and the management of risk are at a high standard. Only marginal elements of residual risk have
been identified with these either being accepted or dealt with. A sound system of control designed to achieve the system
objectives is in place and being applied consistently. 
Substantial 
Internal control, governance and the management of risk is sound. However, there are minor areas of weakness which put some
system objectives at risk and specific elements of residual risk that are slightly above an acceptable level and need to be
addressed within a reasonable timescale. 
Reasonable 
Internal control, governance and the management of risk are broadly reliable. However, whilst not displaying a general trend,
there are areas of concern which have been identified where elements of residual risk or weakness may put some of the system
objectives at risk. 
Limited 
Internal control, governance and the management of risk are displaying a general trend of unacceptable residual risk above an
acceptable level and placing system objectives are at risk. Weakness must be addressed with a reasonable timescale with
management allocating appropriate resources to the issues raised. 
No Assurance 
Internal control, governance and the management of risk is poor. Significant residual risk and/or significant non-compliance with
basic controls exists leaving the system open to error, loss or abuse. Residual risk must be addressed immediately with
management allocating appropriate resources to the issues. 
Page 61

Page 62

This page is intentionally left blank

Page 63

Argyll & Bute Health & Social Care Partnership
Internal Audit Report
June 2022
FINAL 
High Medium Low VFM
Number of Findings 1 0 0 0 
Workforce Planning
Audit Opinion: Reasonable 
Page 63

Page 64

2 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Workforce Planning, June
2022 
Contents 
1. Executive Summary .............................................................................................................. 3
Introduction................................................................................................................................. 3
Background.................................................................................................................................. 3
Scope........................................................................................................................................... 4
Risks ............................................................................................................................................ 4
Audit Opinion .............................................................................................................................. 4
Recommendations ....................................................................................................................... 5
2. Objectives and Summary Assessment.................................................................................... 5
3. Detailed Findings .................................................................................................................. 5
Appendix 1 – Action Plan.............................................................................................................. 9
Appendix 2 – Audit Opinion........................................................................................................ 11 
Contact Details 
Internal Auditor: David Sullivan 
Telephone:  01546 604125
e-mail:   david.sullivan@argyll-bute.gov.uk 
www.argyll-bute.gov.uk
Page 64

Page 65

3 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Workforce Planning, June
2022
1. Executive Summary
Introduction
1. As part of the 2021/22 internal audit plan, approved by the Audit & Risk Committee in April
2021, we have undertaken an audit of Argyll & Bute Health & Social Care Partnership (HSCP)
system of internal control and governance in relation to Workforce Planning. 
2. The audit was conducted in accordance with the Public Sector Internal Audit Standards (PSIAS)
with our conclusions based on discussions with Health & Social Care Partnership officers and the
information available at the time the fieldwork was performed. The findings outlined in this
report are only those which have come to our attention during the course of our normal audit
work and are not necessarily all the issues which may exist. Appendix 1 to this report includes
agreed actions to strengthen internal control however it is the responsibility of management to
determine the extent of the internal control system appropriate to the HSCP. 
3. The contents of this report have been agreed with the appropriate Health & Social Care
Partnership officers to confirm factual accuracy and appreciation is due for the cooperation and
assistance received from all officers over the course of the audit.
Background
4. Workforce planning is a key business process which aligns changing organisation needs with
people strategy.  Workforce planning is the process of ensuring that you have the right number
of people, with the right skills, employed in the right place at the right time to deliver the
organisations short and long term objectives.   
5. Workforce planning is about generating information, analysing it to inform future demand of
people and skills, and translating the information into a set of actions that will develop and build
on the existing workforce to meet demand.  It is also about determining future workforce needs
and identifying workforce gaps against future needs.  One of the seven areas of priority in the
HSCP Strategic Plan 2019/20 – 2021/22 (The Strategic Plan) is to efficiently and effectively
manage all resources to deliver best value. 
6. The Strategic Plan recognises that the HSCP need to support staff as they transform the way they
deliver services in the future and recognise the need to have valued, skilled, motivated, flexible
workforce to transform together to deliver the changes required.  The Strategic Plan details the
steps to be taken to meet their goals, including implementing the National Health & Social Care
Workforce Plans, reviewing the Organisational Development Strategy and developing a plan to
support the workforce. 
7. Employees are one of the HSCP’s core resources, are at the heart of what we do and at the
frontline of all services we deliver. The HSCP workforce includes employees of two different
organisations, Argyll and Bute Council (the Council) and NHS Highland (NHSH), as well as people
in many organisations and individuals that contribute as part of an overall workforce delivering
health and social care.  The Strategic Plan recognises that the workforce is vital to support the
delivery of the HSCP’s vision and that they need to feel valued and be skilled, motivated and
flexible to support the HSCP.  The HSCP recognise the need to attract and retain their workforce
Page 65

Page 66

4 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Workforce Planning, June
2022
and invest in training and development, and involve the workforce in shaping how future
services look. 
8. The National Health and Social Care Workforce Plan (National Workforce Plan), published by the
Scottish Government in June 2017, marked the beginning of a process to further improve
workforce planning across health and social care.  Its overall aim is to support organisations
which provide health and social care services to identify, develop and put in place the workforce
they need to deliver safe and sustainable services to Scotland’s people.  A “Six Step
Methodology to Integrated Workforce Planning” has been designed by Skills for Health as a
practical approach to planning that ensures you have a workforce of the right size with the right
skills and competencies. 
9. Workforce planning is the responsibility of management within the HSCP and receives support
from the Council to enable this planning.  The alignment between the Council and the NHS is
essential to the development of the workforce in the integrated services.   
10. Integrated authorities are required to ensure that a draft 3 year Workforce Plan (WP) is
developed no later than 31 July 2022 and should cover the period 1 April 2022 to 31 March
2025. Once analysis and feedback on the plan has taken place HSCP should publish a final
version of the plan on their website no later than October 2022.
Scope 
11. The scope of the audit was to review the progress being made to meet the deadline of July 31
2022 for the draft 3 year Workforce Plan to be submitted to the Scottish Government.
Risks
12.  The risks considered throughout the audit were:
 Audit Risk 1: an effective draft workforce plan has not been developed
 Audit Risk 2: the HSCP has failed to collate and analyse the detailed information and
priority arears for workforce planning
 SRR 10 : Inability to recruit and retain the required workforce because of National
workforce and Local challenges
Audit Opinion
13. We provide an overall audit opinion for all the audits we conduct. This is based on our
judgement on the level of assurance which we can take over the established internal controls,
governance and management of risk as evidenced by our audit work.  Full details of the five
possible categories of audit opinion is provided in Appendix 2 to this report. 
14. Our overall audit opinion for this audit is that we can take a reasonable level of assurance
subject to the intimation by relevant officers that this workforce plan will be submitted in time
to the Scottish Government in July. This means that internal control, governance and the
management of risk are broadly reliable. However, whilst not displaying a general trend, there
are areas of concern which have been identified where elements of residual risk or weakness
may put some of the system objectives at risk.
Page 66

Page 67

5 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Workforce Planning, June
2022
Recommendations
15. We have highlighted one high priority recommendation where we believe there is scope to
strengthen the control and governance environment. These are summarised below:
 HSCP should ensure that the draft HSCP 3 year Workforce Plan is submitted by 31 July
2022. 
16. Full details of the audit findings, recommendations and management responses can be found in
Section 3 of this report and in the action plan at Appendix 1.
2. Objectives and Summary Assessment
17. Exhibit 1 sets out the control objectives identified during the planning phase of the audit and our
assessment against each objective.
Exhibit 1 – Summary Assessment of Control Objectives 
Control Objective Link to Risk Assessment Summary Conclusion
1 An effective draft
workforce plan has
been developed and
will be produced by
31st July 2022
Risk 1
SRR 10
Limited
Assurance
The HSCP workforce planning team are
currently working on the draft plan,
however at the time of the audit the
draft document was not available for
review. An IJB workforce planning
development session was recently held
which Internal audit attended.
Conclusions from the session indicate
that the workforce planning team are
following the guidance supplied by the
Scottish Government (SG).  In addition
those in attendance at the
development session are assured that
sufficient progress is being made to
meet the submission deadline of 31
July.
2 The HSCP has
collated and
analysed detailed
information and
priority areas for
workforce planning
Risk 2
SRR 10
Reasonable Discussions with the workforce
planning team and assessment made
from the development session lead
Internal Audit to conclude that the
HSCP have addressed or are currently
addressing the requirements as laid
out within the SG guidance. 
18. Further details of our conclusions against each control objective can be found in Section 3 of this
report.  
3. Detailed Findings
An effective draft workforce plan has been developed and implemented
19. Guidance provided by the Scottish Government to the HSCP’S in April 2022 clearly sets out the
processes that the HSCP should follow during the preparation of the 3 year Workforce Plan. The
Page 67

Page 68

6 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Workforce Planning, June
2022
workforce plans are expected to use the “Six Step Methodology to Integrated Workforce
Planning” as deigned by Skills for Health as a practical approach to ensure they have a workforce
of the right size with the right skills and competencies as well as the Five Pillars of Workforce
Planning outlined within the National Workforce Strategy (Plan, Attract, Train, Employ, Nurture)
as the basis for outlining proposed actions to secure sufficient workforce to meet local projected
short-term recovery and medium-term growth requirements across the health and/or social
care services you manage. 
20. Appendix 1 of the SG guidance sets out an indicative checklist for the HSCP to consider when
preparing their plans, the aim of which is to ensure that HSCP have covered all areas within their
draft plan. The checklist covers in detail the following : 
 methodology 
 partnership working
 alignment with other strategic documents
 planning the required workforce
 action planning
 staff wellbeing
 summary of actions
 implementing and review 
21. A development session was held on 15 June 2022 the aim of which was to advise stakeholders of
the progress being made towards meeting the requirement to submit the draft 3 year workforce
plan to the Scottish Government by 31 July.  Internal audit attended the development session
along with other stakeholders, including the Chief Officer of the HSCP and members of the
Integrated Joint Board.  
22. Due to the limited engagement between Internal audit and the HSCP workforce planning team,
reliance has been placed on the information provided during the development session to
appraise progress being made towards meeting the 31 July 2022 deadline.  In addition,
discussions with the workforce planning team leader confirmed all areas required within the
guidance checklist had been or is currently being addressed. 
23. Discussions with the workforce planning team and assessment made from the development
session confirm the HSCP have addressed or are addressing the requirements as laid out within
the Scottish Government guidance.  In addition those in attendance at the development session
are assured that sufficient progress is being made to meet the submission deadline of 31 July.
Action Plan 1
The HSCP has collated and analysed detailed information and priority areas for workforce planning
24. A summary of the progress being made against each of the areas summarised within the
guidance outlined in paragraph 20 is detailed in the table below. 
Page 68

Page 69

7 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Workforce Planning, June
2022
Area to be
considered
Example of content Comment Progress to meet
deadline if 31 July
2022
Methodology Workforce Plan has
been developed using
a methodology
appropriate to the
organisation’s needs. 
HSCP have broadly
based their
methodology on the 5
pillars of workforce
planning as required
by the Scottish
Government.
N/A
Partnership Working Meetings and
facilitated sessions
have been held with
service leads, SLT,
Scottish Care as
independent sector
representatives. Chief
Social Work Officers,
Primary care lead and
Finance. Facilitated
session to be held
with Joint Partnership
Forum prior to first
draft submission.
Meets the
requirements as
outlined in guidance.
On track
Alignment with other
Strategic Documents
Reflects service
priorities in
operational plans and
strategic plan. 
The workforce plan
will be fully aligned to
the strategic
document, including
the workforce risks
and actions
identified. Funding
will be reflected
within the plan.
On track
Planning the required
workforce
The Workforce
Planning document
will describe how the
workforce will
support recovery,
growth and
transformation.
The workforce plan
should analyse the
health and social care
needs of the
population and
identifies the impact
on local workforce
demand.
The risks/actions
within the plan are
aligned to the
strategic priorities
each of which are
focussed on
recovery/growth and
transformation. 
Risks around cost of
living crisis, energy
costs, and labour
market issues among
others have been
considered and are to
be further developed.
On track
Action Planning  Describes areas of
workforce skill
development.  
Currently being
developed.
On track
Page 69

Page 70

8 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Workforce Planning, June
2022
Describes the needs
for new posts; 
Details local actions.
Staff Wellbeing  Workforce plan
should describe
actions supporting
the health and
wellbeing of the
workforce.
The plan should
consider diversity and
inclusions.
Plan should describe
key workforce issues
affecting the quality
of staff experience
and projected impact
of these on staff
retention.
Currently being
developed.
On track
Summary of Actions  All actions are
summarised and
aligned to the 5
pillars.
Currently being
developed.
On track
Implement and
Review 
Identify targets. Slides outlined
actions/targets to be
considered.
The strategic
workforce planning
group will oversee
the work streams
tasked with delivery
of the actions within
the workforce plan.
On track 
25.  As the development of the draft Workforce Plan is ongoing we were unable to undertake a full
audit of Workforce Planning. Consideration will be given to undertaking a full audit of Workforce
Planning in due course. 
Page 70

Page 71

Appendix 1 – Action Plan 
No Finding Risk Agreed Action Responsibility / Due Date
High
1 Draft Workforce Plan 
HSCP should ensure that the draft Workforce Plan is
submitted to the Scottish Government by 31 July. 
Failure to meet Scottish
Government deadline. 
To ensure that the first
draft of the workforce
plan will be consulted
upon, drafted and
submitted by 31 July. It
is noted that it is
expected that there will
be further iterations of
the document between
July and October as the
plan is finalised. 
Head of People Planning,
Analytics and Reward 
30 September 2022 
Page 71

Page 72

10 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Workforce Planning, June 2022
In order to assist management in using our reports a system of grading audit findings has been adopted to allow the significance of findings to be ascertained. 
The definitions of each classification are as follows: 
Grading    Definition
High  A major observation on high level controls and other important internal controls or a significant matter relating to the critical success of the
objectives of the system.  The weakness may therefore give rise to loss or error. 
Medium 
Observations on less significant internal controls and/or improvements to the efficiency and effectiveness of controls which will assist in meeting
the objectives of the system.  The weakness is not necessarily substantial however the risk of error would be significantly reduced if corrective
action was taken.  
Low  Minor recommendations to improve the efficiency and effectiveness of controls or an isolated issue subsequently corrected.  The weakness does
not appear to significantly affect the ability of the system to meet its objectives. 
VFM  An observation which does not highlight an issue relating to internal controls but represents a possible opportunity for the HSCP to achieve better
value for money (VFM). 
Page 72

Page 73

11 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Workforce Planning, June 2022
Appendix 2 – Audit Opinion 
Level of Assurance  Definition 
High 
Internal control, governance and the management of risk are at a high standard. Only marginal elements of residual risk have
been identified with these either being accepted or dealt with. A sound system of control designed to achieve the system
objectives is in place and being applied consistently. 
Substantial 
Internal control, governance and the management of risk is sound. However, there are minor areas of weakness which put some
system objectives at risk and specific elements of residual risk that are slightly above an acceptable level and need to be
addressed within a reasonable timescale. 
Reasonable 
Internal control, governance and the management of risk are broadly reliable. However, whilst not displaying a general trend,
there are areas of concern which have been identified where elements of residual risk or weakness may put some of the
system objectives at risk. 
Limited 
Internal control, governance and the management of risk are displaying a general trend of unacceptable residual risk above an
acceptable level and placing system objectives are at risk. Weakness must be addressed with a reasonable timescale with
management allocating appropriate resources to the issues raised. 
No Assurance 
Internal control, governance and the management of risk is poor. Significant residual risk and/or significant non-compliance with
basic controls exists leaving the system open to error, loss or abuse. Residual risk must be addressed immediately with
management allocating appropriate resources to the issues. 
Page 73

Page 74

This page is intentionally left blank

Page 75

ARGYLL AND BUTE COUNCIL  AUDIT & SCRUTINY COMMITTEE   
FINANCIAL SERVICES  15 SEPTEMBER 2022  
AUDIT AND SCRUTINY COMMITTEE ANNUAL REPORT 2021/22 
1. SUMMARY 
1.1 The purpose of this report is to provide the Chair of the Audit and Scrutiny
Committee’s (the Committee) annual overview of the Committee’s activity
during the financial year 2021/22 and a summary of key developments
since the commencement of 2022/23.  It sets out how the Committee has
fulfilled its remit and provides assurances to the Council. 
2. RECOMMENDATIONS 
2.1 Review and endorse the Chair’s Annual Report. 
2.2 Agree that the Chair presents the report to a future meeting of the Council at
a date to be confirmed. 
3. DETAILS 
3.1 It is important that the Committee fully complies with best practice guidance  
on Audit Committees to ensure it can demonstrate its effectiveness as a
scrutiny body as a foundation for sound corporate governance for the
Council. The Chartered Institute of Public Finance and Accountancy
(CIPFA) issued an updated guidance note Audit Committees Practical
Guidance for Local Authorities and Police 2018 Edition which incorporates
CIPFA’s Position Statement: Audit Committees in Local Authorities and
Police. This sets out CIPFA’s view of the role and functions of an Audit
Committee. The CIPFA Audit Committees Guidance includes the
production of an annual report on the performance of the Audit Committee
against its remit for submission to the Council. 
4.  CONCLUSION 
4.1 The Audit and Scrutiny Committee Annual Report 2021/22, which is
appended to this report as Appendix 1, provides assurance to full Council
over the activity of the Committee. 
5.  IMPLICATIONS    
5.1 Policy: None  
5.2 Financial: None  
5.3 Legal: None 
5.4 HR: None 
5.5 Fairer Scotland Duty: None 
5.5.1 Equalities: None 
5.5.2 Socio-Economic Duty: None
Page 75 Agenda Item 8

Page 76

5.5.3 Islands Duty: None 
5.6 Risk: None 
5.7 Customer Service: None    
For further information please contact Internal Audit (01546 604108) 
Paul Macaskill
Chief Internal Auditor
15 September 2022 
Appendices: 
1. Audit and Scrutiny Committee Chair Annual Report 2021/22 
Page 76

Page 77

1 
Appendix 1 - Audit and Scrutiny Committee Chair Annual Report 2021/22 
Introduction by the Chair of Audit and Scrutiny Committee 
This report provides an overview of the Audit and Scrutiny Committee’s (the Committee)
activity during the financial year 2021/22 and a summary of key developments since the
commencement of 2022/23. 
In 2021/22 the Committee met quarterly online with the following as appointed
members: 
Martin Caldwell (Chair) George Freeman Richard Trail 
Sir Jamie McGrigor Andrew Vennard
Jim Lynch (Vice Chair) Alan Reid Jim Findlay 
Committee meetings were also attended by appropriate representatives of the Council
including the Interim Chief Internal Auditor (CIA).  Audit Scotland also attend as do other
Council Officers as and when appropriate including the Chief Executive and the Head of
Customer Support Services who attends regularly to advise the Committee on issues
relating to performance management. 
In June 2021 an Interim Chief Internal Auditor was appointed, Moira Weatherstone, due
to the CIA taking up the post of Interim Head of Financial Services on a 100% basis until
leaving the Council and the post of CIA subsequently becoming vacant.  I am satisfied
that appropriate arrangements were put in place to support and cover the role of CIA
until the interim arrangement ceased in June 2022 when a permanent Chief Internal
Auditor was appointed and took up this role on the 4 July 2022.  I would like to thank
Moira Weatherstone for managing the Internal Audit service and supporting the
Committee during this period. I would also like to record my appreciation to Laurence
Slavin the former CIA who took up post with West Dunbartonshire Council and wish him
every success in his new role. 
In 2022, saw the term of Councillor appointments come to an end and local elections
held in May 2022.  Firstly, I would like to sincerely thank all those Members of the
Committee who served during this period and the valuable contribution which they have
made to the governance of the Council.  Secondly, to welcome the new Members of the
Audit and Scrutiny Committee since their appointment in May 2022. 
In looking forward to 2022/23 and beyond, the Council will need to continue to balance
the demands of the community it serves in the backdrop of challenging financial times
and also taking cognisance of the longer term effects of the COVID-19 pandemic on
both the Council itself but also the wider Argyll and Bute community.  Needless to say
the Council stepped up to challenges of the pandemic and responded well. 
Martin Caldwell - Chairperson 
15 September 2022
Page 77

Page 78

2 
1. Audit and Scrutiny Committee’s Effectiveness and Impact
1.1 The Committee’s role is to ensure that the Council’s internal control
framework and governance arrangements are operating effectively.  In order
to fulfil this role a range of reports are provided to the Committee during the
year.  I am satisfied that the frequency, content and detail of reports provided
to the Committee allow myself and fellow members to adequately fulfil this
role.
1.2 In March 2021 both Audit Scotland and Internal Audit presented their annual
audit plans setting out their respective approach to the 2021/22 audit of the
Council, reflecting their statutory duties and risk based approach. The audit
plans were considered by the Committee and accepted. 
1.3 During 2021/22 the CIA has continued to develop our approach to audit and
scrutiny.  Particular developments which have furthered the effectiveness of
both Internal Audit and the Committee are:
• The establishment of a Counter Fraud Team in September 2020 for a trial
two year period. This trial has subsequently proved so successful that this
arrangement has now been made permanent.
• The approach to Scrutiny is developing and two scrutiny reviews were
undertaken in 2021/22 and arrangements are underway for identifying
suitable topics in 2022/23.
• The CIA engaged with members of the Committee as part of the planning
process for the 2021/22 audit plan.
• An external assessment has been scheduled for 2022 in terms of
compliance with the Public Sector Internal Audit Standards (PSIAS) and a
portfolio of evidence has been prepared. 
2. Assurances 
Internal Audit Assurance
2.1 Internal Audit is a key source of assurance for both members and
management on the effectiveness of the control environment. The Committee
has a responsibility for ensuring that Internal Audit is effective in the provision
of this assurance.  The COVID-19 pandemic meant the 2021/22 audit plan
could not be completed in its entirety due to a need to redeploy audit
resource to priority tasks required to support the Council’s response to the
pandemic.  However I am content that the amended plan has been
substantially completed with only two reviews having to be removed from the
original approved plan.  I am content with the assurance provide by the
Interim CIA that sufficient work has been undertaken to allow her to provide
an opinion on the Council’s systems of governance and internal control.
Throughout the year, in my opinion, clear assurance judgements are
provided, underpinned by an appropriate evidence base and, where
appropriate, include sound management advice and guidance. 
2.2 The Committee has received regular reports and information from the CIA
including:
• risk based internal audit annual plan
• regular progress reports
• annual report, in line with PSIAS, which provided the CIA’s independent
annual opinion on the effectiveness of the Council’s risk management,
Page 78

Page 79

3 
internal control and governance processes. 
2.3 Exhibit 1 shows an analysis of assurance opinions provided by internal audit
in the three year period 2019/20 – 2021/22. There has been an increase in
the number of audits classified as providing a high level of assurance in
2021/22, with a decrease in the number of audits classified as providing a
substantial level of assurance.  There were only two classified as being
limited.  For these, and all other audit reports, management have accepted
100% of audit recommendations and action plans have been agreed with a
robust follow-up system in place with progress presented to the SMT on a
quarterly basis and to the Committee as a standard agenda item.
Exhibit 1 – Audit Assurances (2019/20-2021/22) 
2.4 The Committee has a clear role in relation to oversight of the internal audit
function; specifically in relation to overseeing its independence, objectivity,
performance and professionalism.  I am pleased to advise, as Chair of the
Committee, that I am satisfied that internal audit is effective and activity is
undertaken in accordance with relevant standards. 
External Audit Assurance
2.5 External Audit is an essential part of the process of accountability and
assurance for public funds, providing an independent opinion on the financial
statements, and reviewing aspects of governance and financial management.
Working closely with Internal Audit, the external audit programme ensures
that statutory responsibilities are delivered, without the duplication of audit
work. The Council’s external auditors are Audit Scotland.
2.6 The audit of the Council’s financial statements is still ongoing at the time I
wrote this report and the Council is still to receive its 2021/22 annual audit
report. Consequently this reduces the assurance we can take at the current
time from external audit’s work however the Council were subject to a Best
Value review in 2019/20 which highlighted good progress made by the
Council since the last inspection in 2015, specifically the significantly
improved relationships amongst elected members and between members
and officers and the Council’s sound approach to financial planning. It also
identified areas for the Council to focus its continued improvement upon, such
Page 79

Page 80

4 
as community engagement, performance management, more significant
transformation and redesign of services and better engagement of staff in
planning and implementing change. I am pleased that the Council has
responded positively to these messages and have agreed an action plan to
help address the issues highlighted. It is also worth highlighting that Audit
Scotland attend all meetings of the Committee and provide written and verbal
updates on progress against their audit and any emerging audit issues.  This
helps provide the Committee with ongoing assurance. 
3. Risk Management 
3.1 The CIA performs an annual strategic risk register assurance mapping
exercise which enables the Committee to assess the levels of assurance it
can take over the activity undertaken by the Council to manage its strategic
risks. This is complemented by the Chief Executive presenting the Strategic
Risk Register to the Committee on an annual basis to allow the Committee to
further scrutinise the approaches being taken to manage risk. 
4. Independence 
4.1 To assist in preserving the Committee’s independence measures are in place
including:
• the appointment of an independent chair 
• observation of the Internal Audit Charter which specifies the independence
of the CIA and the wider audit team 
• the non-political approach of the committee
• the active involvement of the external auditors
• clear terms of reference aligned to CIPFA’s Role of the Audit Committee
Guidance 
5. Scrutiny 
5.1 During 2021/22 the Committee undertook two scrutiny reviews, specifically,
Community Asset Transfer and Fly-Tipping. These reports were presented to
the Audit and Scrutiny Committee in June 2022 and also referred to the Area
Committees for information purposes. These reports were well received by
the Committee and widened the understanding of the complexities and
challenges faced by both staff and the community in specific areas and where
these reports will help allow continuous improvement as a Council.
5.2 The benefits of scrutiny are twofold; helping to understand what can often be
multifaceted and procedurally complex issues due to legislation but also to
help consider ways to improve and develop to make any processes more
understandable and/or streamlined where that is at all possible.  
5.3 Scrutiny work will continue and arrangements will be made for suitable
topics/areas to consider in 2022/23. 
6. Counter Fraud Team (CFT) 
6.1 In December 2019 the Strategic Management Team (SMT) approved the
formation of a CFT for a trial two year period from 1 April 2020 with an annual
fraud report to be provided to inform a future decision on whether the CFT
should become a permanent part of the Council’s establishment. The
establishment of the CFT had been initially delayed by the COVID pandemic
Page 80

Page 81

5 
with the Team Leader and Lead Investigator not appointed until September
and October 2020 respectively.  The CFT has been fully operational since
with both officers having completed the CIPFA (Chartered Institute of Public
Finance and Accountancy) Accredited Counter Fraud Specialist Course
meaning they are fully accredited counter fraud investigators.  This was a
welcome development and continues to further strengthen the Council’s
commitment to protecting the public purse. 
6.2 During the period of the pilot, it was reported to the Audit and Scrutiny
Committee in June 2022 that proactive and targeted work in this area has
resulted in £693,416 (ending April 2022) being rebilled and that to date
£590,364 (ending April 2022) has been recovered. The success of the pilot in
both recovery but also in its deterrent effect sends a strong message that the
Council will take all reasonable steps it can to identify error and fraud but also
take appropriate action to recover monies that are due. Regular reports are
presented to Committee each quarter in relation to the work of both Internal
Audit and the Counter Fraud function. 
6.3 In July 2022 the Executive Leadership Team (ELT) considered the pilot and
the positive outcomes that have been achieved to date, together with much
work across the Council area having yet to be undertaken and which I expect
to be equally successful. It is pleasing to note that the arrangements for the
pilot relating to Counter Fraud have been made permanent and this will assist
the Council in demonstrating both its commitment to recovering sums of
revenue due through error or fraud but also in the wider context of good
governance. 
7. Looking Forward 
7.1 In 2022/23 as a result of local elections a new Committee was formed and I
welcome back those previously serving on the Committee but also the new
members who I am sure will contribute to the effectiveness of the Committee
and also continue to look forward to working with our Vice Chair, Councillor
Jim Lynch.
7.2 In 2022/23 the Committee will consider potential options/topics for scrutiny
reviews and as a Committee we will continue to implement and further
develop our scrutiny approach.  
7.3 This focus on continuous improvement is equally applicable to the audit
element of the Committee and we will continue to work with the CIA and,
where appropriate, our colleagues in Audit Scotland and the newly appointed
External Auditors Mazars, to identify opportunities to further develop the
skillset and expertise of both the Committee and the internal audit department
to facilitate effective challenge and scrutiny. 
7.4 The Counter Fraud Team will continue to focus their resources on specific
concerns across the local authority area seeking to recover monies owed and
due to the Council in accordance with its policies.
7.5 The Council continue to provide the audit services to the HSCP and were
awarded the contract for a period of three years commencing 1 April 2021.  A
formal service level agreement was signed on 28 January 2021 to reflect the
new contract. In 2022/23, a plan of audit coverage was agreed and presented
to their Audit and Risk Committee.
Page 81

Page 82

6 
7.6 Paul Macaskill has been appointed as the new CIA and welcome him to the
Council in his new role and also in providing the Induction and Development
Training session to the Committee in June 2022.  I look forward and I am sure
the Committee will also look forward to working with Paul and his team going
forward. 
7.7 We will continue to provide updates on progress of the CFT and reports will
be presented to the Committee as part of the quarterly and annual reporting
of the Internal Audit service. 
8. Conclusion 
8.1 Based on the reports received and reviewed by the Committee, I am in in
agreement with the CIA’s annual audit report which confirms that reasonable
assurance can be placed upon the adequacy and effectiveness of the
Council’s internal control system in 2021/22. I am satisfied that active
monitoring and follow up of recommendations are in place in respect of
agreed management action. This follow up process is further enhanced by
the continuous monitoring programme carried out by internal audit which
provides ongoing assurance over the Council’s core transactional based
systems. 
Page 82

Page 83

ARGYLL AND BUTE COUNCIL  AUDIT AND SCRUTINY COMMITTEE                                                         
FINANCIAL SERVICES  15 SEPTEMBR 2022 
COUNTER FRAUD TEAM (CFT) ANNUAL REPORT AND UPDATE 2022 
1. INTRODUCTION 
1.1  This report updates the Audit and Scrutiny Committee (the Committee) on the
progress of the two year pilot Counter Fraud Team (CFT) established in September
2020. 
2.0 RECOMMENDATIONS 
2.1 Endorse the contents of the Annual Report and progress of the CFT since its
inception in September 2020. 
2.2 
2.3
Note that the Executive Leadership Team (ELT) have agreed to make the posts
permanent. 
Note that future annual reporting relating to counter fraud will be included within the
Internal Audit Annual Report.  
3.0 DETAIL 
Background 
3.1 In December 2019 SMT approved the formation of a CFT for a trial two year period
from 1 April 2020 with a report to be provided to inform a future decision on whether
the CFT should become a permanent part of the Council’s establishment. 
3.2 The establishment of the CFT was delayed by the COVID pandemic with the Team
Leader and Lead Investigator not appointed until September and October 2020
respectively.  On that basis the two year pilot will end in September 2022. 
3.3 The two roles (an LGE 9 and LGE 8) incur total annual staff costs of £73k in 2022-
23 (including oncosts). The CFT is a “spend to save” pilot meaning the amount
billed and recovered will need to match, and preferably exceed the staff costs
incurred.  However it should be noted that the value of the CFT to the Council is
more than just the monetary aspect.  They also provide a deterrent to fraud being
perpetrated in the first place and can also protect staff against malicious
accusations of alleged fraud.   
3.4 Both the Team Lead and Lead Investigator underwent the CIPFA Accredited
Fraud investigators course and concluded their studies in January 2021.  Both
members passed and are now accredited fraud investigators.  The CFT team
leader is pursuing a Masters in Finance via Glasgow Caledonian University
Page 83 Agenda Item 9

Page 84

Apprenticeship and has an unconditional offer to study in September 2022. 
Activity To Date – Investigations 
3.5 Between October 2020 and April 2022 the CFT received various allegations
including those against Council employees. The CFT will always pursue
employee allegations to either uphold the allegation and/or protect our employees
from malicious referrals. 
The CFT have also proactively investigated a further 3 employees as a result of
ongoing investigations.  All 3 incidents led to training issues. 
Activity To Date – Proactive Work 
3.6 A large element of the work of the CFT focuses on maximizing the Council’s
revenue streams by reducing the amount of benefit fraud (deliberate and
accidental).   
The CFT work closely and routinely with colleagues in Revenues and Benefits. 
Where proactive work, reactive work or reviews are carried out by the CFT or Revs
and Bens, this brings consistent and additional work such as account holder
complaints, penalty reviews, and/or further fraudulent investigative work.  The CFT
rely on the revenue and benefits staff for the behind the scenes contribution.  
Further gratitude goes to the empty homes team for information sharing that has
proven vital in securing proper charges to empty homes and securing empty homes
back to being occupied. 
3.7  The primary way to maximize revenue is through being proactive and performing
these reviews where cumulative knowledge and experience indicates a higher
chance of a successful outcome. Some examples are single person discounts,
student exemptions, second homes, long term empty properties, bi-annual
reviews for penalty charges and reviews of residential properties used as places
of employment.   
The table below summarises some examples of this proactive work 
Situation Conclusion and Status
1 Retired Individuals claiming exemptions Rebilling of £3940 – paid in full
2 Single Person discount removal via work with
NDR Debt Recovery 
Rebilling of £650– paid in full
3 Claimant receiving discount as home classified
as for sale. This exemption had expired and the
house should been classified as an empty
home with double charge levied.
Rebilling of £5,295 - £3,252
recovered to date. 
4 Empty home identified which was not subject to
the double charge 
Rebilling of £3,500 - £1,424
recovered to date. 
5 Single Person Penalty Charges 
Student Review
2019-2020 - rebilling of £5,478
for penalty charges 
2020-2021 - rebilling of £25,757
Page 84

Page 85

for penalty charges and £13,819
for Student Exemption 
Recovery in progress 
6 Second Home not declared. Back date of
appropriate rates. 
Rebilling of £16,093 – recovered
in full
7 Empty home identified which was not subject to
the double charge 
Rebilling of £8,890 – recovered
in full
8 Fraudulent application of Business Support
Grant.  CFT became involved when Rates
Team asked for advice.  CFT investigated the
business
Refusal of £6,000 grant.
9 Inheritance of property remaining under
deceased name.  
£4696 – recovered in full
10 Readjustment of Tax Benefits through work
carried out via the National Fraud Initiative
£673.66 – recovered in full
11 Empty Home identified under deceased
exemption and not subject to double charge
£2893 – recovered in full
12 Review carried out, and site visits to Tarbert.
Numerous fraudulent claims for a variety of tax
exemptions
Rebill of £11,693 – £2332.75
recovered and in progress
13 Full Single Person Discount Review. Work
alongside Revs and Bens team.
Rebill of £239,862.  Recovered
in full.
14 Review of Covid Grants.  Investigation into
repayment of funds due to exceeding criteria
£120,000.  Recovery in progress
however this is central
government funds.  The council
may be entitled to a small
percentage. 
3.8 
3.9 
3.10 
3.11 
Activity To Date – Reactive and Rebilling Vs Costs 
Reactive work is also an important role of the team to reduce benefit fraud.  The
CFT continue to receive referrals of alleged council tax fraud which have resulted
in comprehensive investigatory work. 
Since the inception of the CFT pilot there have been 124 referrals to date with the
number growing each year. Some of these referrals have identified instances of
fraud, some concluded no offence has occurred and others have been referred
on to other teams within the Council or the Police. 
The number of referrals made to the CFT are included in the following table. 
Referrals are made via the online portal via the council website, by telephone and/or
by email.  The CFT will investigate all referrals in the first instance to confirm basis
of facts.  
Thereafter once corroborative evidence is found and the referral is substantiated the
CFT will conduct full investigations.  Investigations often require the assistance from
other councils departments for information such as HR, Revs ad Bens, Blue Badge
Page 85

Page 86

team, etc.  Failing the test after initial evidence gathering the referral will be rejected,
refuted or closed accordingly.
All benefit referrals are sent to the Department of Work and Pensions.  Other
referrals include data sharing to Police Scotland, Health and Social work and other
outside agencies. 
3.12 The table below summarises the total income recovered by the team to date. This
has been broken down into reactive work through referrals, which can also be
quantified in terms of numbers, and proactive work such as large scale council tax
reviews. The total fund recovered by the Fraud Team are 
Reactive Work Total  Pursued/  
Concluded/     
Upheld
Rejected/ 
Refuted/           
Not Upheld
Rebilled
Value (£)
Employee 14 10 4 6,251
Council Tax 74 18 56 56,808
Blue Badge 6 0 6 0.00 
DWP 21 21 0 673
Grants 7 4 2 118,500
Other 13 12 1 0.00
Welfare Fund 0 0 0 0.00
Total  135 66 69 63,732
Proactive Work
Total combined work rebilled 778,341
Total combined work recovery 618,103 
Note that the above figures do not include any Grant funds recovered because they
are not part of the Councils revenue streams.
3.13 The process of identifying how much of the recovery relates to the work of the CFT
is challenging and the above figures are based on review of individual accounts.  
The CFT have also relied on the external source namely DataTank to conduct the
large reviews and in doing so they have computer software to track the accounts. 
The CFT will dip sample the accounts in these larger reviews to conduct testing for
accuracy.
3.14  The current recovery in percentage terms is 79.4% rebilled to recovered.
Page 86

Page 87

3.15  Those accounts rebilled but not recovered include situations where properties
have been sold or demolished, or where the account holder is not a UK resident
or their property has been repossessed.
3.16  The rebilled accounts are routinely monitored and recovery is updated routinely. 
It is not within the CFT remit to pursue rebilling as that is Debt Recovery teams. 
The CFT will liaise with Debt Recovery for long term debts, work closely together.
The CFT merely monitor recovery for its own records.   The unquantifiable work
carried out by the CFT also raises awareness of the potential for suspicious
activity toward the Council and information is passed nationally to other local
authorities and Police Scotland.  
The CFT remain stout in protecting the public purse in any form.
Other Activity
3.17 In addition to the proactive and reactive work detailed above the CFT have
progressed a number of other initiatives to further the Council’s approach and
awareness of fraud matters.  These include:
 Raising awareness through presenting to the Audit And Scrutiny
Committee, SMT and  Financial Services Management Team
 Developing a LEON training course
 Reviewing and proposing changes to the Council’s Anti-Fraud Strategy
and Public Disclosure Policy 
 National Fraud Initiative (NFI) Administrator.  The CFT team leader is now
the Key Contact and work is carried out bi-annually to cross reference
Cabinet Office data highlighting areas of risk of fraud and error. 
 National Anti Fraud Network (NAFN) Administrator.  The CFT team
investigator is the key contact and sole administrator.  This system is used
daily by the CFT for evidential sources that can prove/disprove fraudulent
claims.
 Scottish Local Authority Investigators Group (SLAIG) member.  Attendance
of quarterly information sharing
 Audit Scotland Liaison.
 Police Scotland Liaison.  Both CFT members are in regular contact with the
L Division Local Intelligence Officer (LIO).  The CFT regularly provide
updates to Police Scotland and share information. 
3.18  Next Steps 
 Continued assessment of reactive and proactive work.  
 Spring 2022 – Tarbert (completed)
 Spring 2022 – Oban
 Summer 2022 – Dunoon
 Summer 2022 - Helensburgh
 End of 2022 – Second Home review 
Page 87

Page 88

4.0 CONCLUSION 
4.1 The CFT is progressing well with both team members now fully CIPFA accredited
fraud investigators. Continued routine work is required to be able to accurately
track the full income recovered from the team’s work however based on the
amount of additional billing, even accounting for a degree of non-recovery, the
indications are that they are easily exceeding target. In addition they are raising
awareness of the Council’s zero tolerance to fraud and this will act as a deterrent
to fraud being perpetrated in the first place. Crucially had no Counter Fraud team
been in place then the reported instances of fraud would still be taking place at a
cost to the Council and public purse. Given the success of the pilot, the ELT met
in July 2022 and agreed to make these posts permanent. 
5. IMPLICATIONS  
5.1 Policy - None
5.2 Financial – Recovery of income from fraudulent activities
5.3 Legal – Employee Conduct Reports
5.4 HR – Employee Conduct Reports
5.5 Fairer Scotland Duty – None
5.5.1 Equalities – None
5.5.2 Socio-Economic Duty – None
5.5.3
5.6
Islands Duty – None
Climate Change - None
5.7 Risk – Reducing Council’s exposure to fraud
5.8 Customer Service – None 
Paul Macaskill
Chief Internal Auditor
15 September 2022                                                  
For further information contact: Colin Rae, Tel: 01436 657685, colin.rae@argyll-
bute.gov.uk 
Page 88

Page 89

ARGYLL AND BUTE COUNCIL  AUDIT AND SCRUTINY COMMITTEE 
FINANCIAL SERVICES  15 SEPTEMBER 2022 
STRATEGIC RISK ASSURANCE MAPPING 
1. EXECUTIVE SUMMARY 
1.1 The purpose of this report is to set out Internal Audit's assessment of the sources
of assurance for the Audit and Scrutiny Committee (the Committee) on the
management of the Council's strategic risks. 
1.2 Appendix 1 highlights the overall assessment against each of the strategic risks.
It should be noted that the assessment is based on the level of assurance that the
Committee can rely on. A 'red' assessment therefore highlights where there are
gaps in evidence of active/targeted actions/activity rather than an assessment on
the management of that risk. 
2. RECOMMENDATIONS 
2.1 To note the risk assurance map at appendix 1. 
2.2 To consider the implications for audit or scrutiny coverage in the respective audit
and scrutiny annual plans. In particular a potential scrutiny review focusing on
waste management in 2023/24. 
3.  DETAIL   
3.1 Internal audit has a key role in relation to the Council’s governance to provide
assurance over the effective management of risk. 
3.2 The Chief Executive presents the Strategic Risk Register to the Committee on an
annual basis (usually June) which provides the Committee the opportunity to
scrutinise the register and seek assurance from the Chief Executive that risks are
being managed appropriately.  
3.3 The CIA is of the view that the cumulative effect of the these management
arrangements both contribute to positive risk management reporting within Argyll
and Bute Council but also maintaining an annual review in order to maintain
appropriate overview and update of key emerging issues which will be reported
to the Audit and Scrutiny Committee. 
3.4 The Public Sector Internal Audit Standards (PSIAS) require that Internal Audit
evaluate the effectiveness of the Council’s risk management process. However it
does not state this needs to be an annual exercise. Furthermore it states that
Internal Audit’s may gather the information to support an assessment of the
effectiveness of risk management processes ‘during multiple engagements ‘ and
further states that ‘The results of these engagements, when viewed together,
provide an understanding of the organisation’s risk management processes and
their effectiveness .  As such PSIAS does not require a full risk management
audit on an annual basis.  Furthermore The CIPFA publication “Audit
Committees:  Practical Guidance for Local Authorities and Police” (2018 Edition)”
Page 89 Agenda Item 10

Page 90

requires the Audit Committee to have the option to consider risk management on
a regular basis, regardless of who has operational responsibility for it.  That
option is always available. 
3.5 Appendix 1 provides a summary of the Council’s strategic risk assurance map
which is based on the ‘three lines of defence’ model. 
1. The first line of defence is the ‘functions that own and manage risks’. It
is the control environment established by day to day business
operations and risk management processes. It is formed by managers
and staff who are responsible for identifying and managing risk as part
of their accountability for achieving objectives. This requires an
understanding of the Council, its objectives, the environment in which it
operates, and the risks it faces. It includes things such as: 
 identifying risks and improvement actions
 implementing controls
 reporting on progress 
2. The second line of defence is the ‘functions that oversee or who specialise
in compliance or the management of risk’. This provides the policies,
frameworks, tools, techniques and support to enable risk and compliance
to be managed in the first line, conducts monitoring to judge how
effectively they are doing it, and helps ensure consistency of definitions
and measurement of risk. The Council’s various committees and Strategic
Management Team are key functions in delivering this element. 
3. The third line of defence is the ‘functions that provide independent
assurance’. This is provided by internal and external audit and any other
scrutiny or regulatory body who offer independent challenge and provide
an evaluation, through a risk-based approach, on the effectiveness of the
Council’s governance, risk management, and internal control. 
3.6 The table below summarises the assessment against each Strategic Risk.
Strategic Risk Risk Score
(June 2022)
Assurance
Assessment
1. Population and economic decline Red 16 Green
2. Condition and suitability of infrastructure and
asset base
Amber 12 Green
3. Financial sustainability Amber 12 Green
4. Governance & leadership Amber 8 Green
5. Engagement and understanding the needs of
the community
Amber 9 Green
6. Service delivery Green 6 Green
7. Health & Social Care Partnership Amber 12 Amber
8. Civil contingency and business continuity
arrangement are not effective
Green 6 Amber
9. Welfare reform Green 6 Amber
10. Waste management Red 16 Amber
11. Service delivery – Cyber Security Red 15 Amber
12. Impact of Covid-19 Amber 12 Green 
3.7  The assurance map has not identified an area where there may be a concerning
mismatch between the level of risk identified and the assurance provided to
Page 90

Page 91

Committee.  However, in relation Waste Management the risk score and
assurance assessment in place are at the higher end of the amber scale, this
was predominantly due to the Council being in the process of drafting and
preparing a new waste strategy, together with the uncertainty being created by
planned ban on landfilling Biodegradable Municipal Waste (BMW) which was
due to be originally implemented in January 2021 but has been postponed until
December 2025. In terms of balance, however, this problem is also affecting a
number of other and more distant local authorities and creating similar risk
assessment issues. The Council appears to be taking all reasonable steps it
can to engage in discussion with the Scottish Government concerning the
matter and outlining the significant costs that may be associated with
compliance. The Audit and Scrutiny Committee may wish to consider this as a
potential scrutiny topic in 2023/24 in order to allow further discussions and
implications to be considered by the Council in the current financial year. 
3.8 
3.9 
In relation to ‘Service Delivery – Cyber Security’; work is being undertaken in
this area for 2022/23 as part of the Internal Audit Plan and that will help better
inform the position in terms of assurance and our findings will be reported to
the Audit and Scrutiny Committee in due course. 
The remaining areas where assurance has been assessed as “amber” either
have audit reviews already undertaken, scheduled or as part of the ongoing
audit planning process. All changes to the Strategic Risk Register from
September 2022 will be assessed in the 2023 Assurance Mapping Exercise. 
4. CONCLUSION
4.1 This exercise has again confirmed that for the majority of risks in the Council’s
strategic risk register there are either sufficient assurances in place or internal
audit have scheduled work to fill identified gaps. Nevertheless, it is important to
outline that such mitigations and assurances do not alone guarantee that an
adverse event or risk will not present itself or materialise. 
5. IMPLICATIONS 
5.1 Policy - None
5.2 Financial - None
5.3 Legal - None
5.4 HR - None
5.5 Equalities - None
5.6 Risk – The assurance mapping exercise has provided a satisfactory level of
assurance that the Council is managing and monitoring its strategic risks
effectively. 
5.7 Customer Service – None 
Paul Macaskill
Chief Internal Auditor
15 September 2022 
For further information contact: 
Paul Macaskill, Chief Internal Auditor, 01436 604108 
APPENDICES
Appendix 1 – Strategic Risk Assurance Map
Page 91

Page 92

This page is intentionally left blank

Page 93

APPENDIX 1: Strategic Risk Assurance Map 
N
o
Risk Risk
Score 
First Line of Defence  Second Line of
Defence
Third Line of Defence  Assessment
1 Population and
Economic
Decline 
Failure to identify
relevant factors
contributing to the
decline and
failure to develop
strategies and
actions targeting
these factors.
Red
16
 Service planning linked
to Corporate Outcomes
and the A&B Outcome
Improvement Plan
(ABOIP)
 Community and multi-
agency links through
Community Planning
Partnership
 Parliamentary forum
 Argyll, Lomond and
Islands Rural
Regeneration Initiative
 Argyll and the Isles
Strategic Tourism
Partnership
 Promotion and
marketing of Argyll &
Bute (ABplace2B
campaign)
 Business Gateway
Service focused on
helping local
businesses grow
 Council Leader
engaging with leaders
of other west coast
councils suffering
population decline 
 Economic
Strategy and
Action Plan
monitored by
ED&I Committee
 CPP report on the
progress being
made against the
outcomes and
vision of the
ABOIP and issue
annual reports.
 Monitoring of CPP
plan and
performance at
CPP Management
Committee.
 Area Community
Action Plans
progress reported
to Community
Planning Groups
 ABOIP targets
population and
economic
recovery
 Performance
reports
considered by
A&SC, strategic
committees and
area committees 
Future
 Rural Growth Deal
to be signed late
2022 or early
2023
 Preparation of bid
External Audit
 Best Value Assurance
Report (May 2020)
highlights Council’s and
CPP partners commitment
to a shared vision and that
they recognise the
challenges including the
declining and aging
population 
Scrutiny
 Economic Strategy
(2019/20) 
There is a range
of assurance
sources across
the three lines of
defence.
Page 93

Page 94

to Levelling Up
Fund – preparing
for Jan/Feb 2022
in time for
submission
expected Spring
2022
 Settlement Officer
post agreed to be
funded 50:50 from
HIE/Council
focusing on
barriers to people
living in
communities,
housing and
others.
 Preparation of a
pipeline of
projects across
Argyll and Bute in
order to be able to
react to any other
bid funding as and
when it is
announced.   
2 Condition and
suitability of
Infrastructure &
Asset Base 
Infrastructure and
asset base does not
meet current and
future requirements
and is not being used
or managed
efficiently and
effectively.
Amber
12   R&A Control Hub and
Joint Operations Team
 Operational risks
monitored quarterly
 Strategic Asset Mgt
Board
 Corporate Asset
Management Strategy
and Corporate Asset
Management Plan
 Service Asset
Management Plans
 Community
Empowerment and
Community Asset
transfer
arrangements in
 D&I  performance
reporting to ED&I
Committee
 Asset Mgt Plans 
reviewed annually
by Council as part
of the budget
setting process
 Status and
Options reports to
ED&I Committee
Internal Audit
 Community Empowerment
Act (2018/19 - High)
 Capital Monitoring
(2020/21 - Substantial)
 Management of Property
Contracts (2020/21 -
Reasonable)
 Land & Asset Disposal
(2021/22 - Substantial)
 Internal Audit – Fixed Asset
Register  (2021/22) –
Reasonable) 
There is a range
of assurance
sources across
the three lines of
defence.
Page 94

Page 95

place
 Roads Asset
Management Plan
 One Council
Property Approach
 Routine inspections
of roads
infrastructure to
deal with potential
weak areas
 Revised capital
management
procedures 
Future 
 Modern Workspace
Programme to review,
and rationalise property
portfolio for future needs
of the Council.  Changes
on phased and town by
town basis. Programme
will be running for 3
years - April 2024
Scrutiny
 Roads Maintenance
(2018/19)
 Scrutiny – Community Asset
Transfers (2021/22) 
3 Financial
Sustainability 
Insufficient resource
to meet current and
future service
requirement. 
Budget not aligned /
does not support
business outcomes.
Amber
12
 Budget preparation and
monitoring
 Medium term financial
strategy with worst case,
mid case and best case
scenario planning
 Treasury Mgt Policy
 5 year budget outlook 
updated quarterly
 Financial Services 
Team aligned to service
delivery
 Regular engagement
between budget holders
and appointed finance
contact
 Reserve balances
monitored throughout
year 
 Financial
monitoring and
financial risk
monitoring to
P&R/BCC
Committee
 Budget and
budget working
papers
considered by
full Council
 Financial Strategy
reported to P&R
Committee
 5 year budget
outlook to P&R
Committee
 Treasury Mgt
Annual Report to
P&R Committee
Internal Audit
 Continuous Monitoring
 Financial Planning
(2018/19 - Substantial)
 Capital Monitoring
(2020/21 - Substantial)
 Internal Audit – Fixed Asset
Register  (2021/22) –
Reasonable) 
External Audit
 Assessment of financial
mgt via annual audit
 Best Value Assurance
Report (May 2020)
highlights Council has
good financial planning
There is a range
of assurance
sources across
the three lines of
defence.
Page 95

Page 96

and A&SC
 Joint SMT/Policy
Leads meetings
include
discussions
around financial
issues
arrangements in place but
could take steps to
enhance its long-term
strategy. (Strategy revise
in 2021)
 Assessment of budget
monitoring arrangements 
Future
 Internal Audit –
Management of Debt and
Recovery  (2022/23) 
4 Governance and
Leadership 
Governance and
leadership
arrangements are
not conducive to
effective working and
lead to a lack of
strategic direction.
Amber
8
 Corporate
Governance
Improvement Plan
 Ongoing member
development
 Mentoring and
coaching for SMT
 Leadership
development
programme
 Chief Exec
Bilaterals
 A&B Manager’s
Course
 Established
partnership
governance
 Effective internal
audit function
 Scrutiny function
 Performance
Improvement
framework
 Council constitution
 Codes of conduct
for staff and
members
 Code of Corporate
Governance and
 Oversight
provided by Audit
& Scrutiny
Committee
 Decision making
committees open
to public
 Constitution
updated and
approved
annually by
Council
 IA reports and
follow up to DMT
and SMT
 Annual assurance
statements
 Fortnightly DMTs
– weekly ELT and
monthly SMTs
Internal Audit
 Continuous Monitoring
 Organisational Culture
(2018/19)
 Performance Mgt (2018/19
- High)
 Member Support (2018/19
- Substantial)
 Risk Mgt 2018/19 –
Substantial)
 Following The Public
Pound (2019/20 -
Reasonable)
 Annual self-assessment of
PSIAS – external peer
review every 5 years
 Formal Induction of new
Audit and Scrutiny
Committee Members 2022 
External Audit
 Ongoing independent
assurance reported in
AAR
 Best Value Assurance
Report (May 2020)
There is a range
of assurance
sources across
the three lines of
defence
Page 96

Page 97

Annual Action Plan
 Scrutiny framework
and scrutiny plan
 Risk management
embedded
 Policy lead
meetings
 Area Committee
Business Days 
recognises improvements
in relationships between
members and senior
officers and more
constructive and focused
decision making 
5 Engagement and
Understanding the
needs of the
Community 
The Council fails to
understand service
user needs and
emerging
demographic trends
and does not align
service delivery to
meet these.
Amber
9
 Annual budget
consultation
 Complaints process
 Community
Engagement
Strategy
 Customer
Service Board
 Various user
feedback (i.e.
Refugee
Resettlement,
commissioned
services,
community
council surveys)
 Parental
engagement
strategy
 Outreach service
 Democracy
matters
consultation
 Development Mgt
user forums 
 Community
Planning
Partnership
 Service
Committees
 Area Committees
 DMT and SMT 
Internal Audit
 Community Empowerment
Act (2018/19 - High)
 Complaints Handling
(2021/22 – High)
Other Agencies
 Education Scotland and
Care Inspectorate seek
views of service users 
External Audit
 Best Value Assurance
Report (May 2020)
highlights that Council has
made good progress with
the Community
Empowerment Act, but
needs to make processes
easier to follow and
accessible to all
communities. Also scope
to improve community
engagement to make the
approach more inclusive,
achieve wider
representation and build
capacity to enable
communities to take more
ownership of decision-
making. The Council has a
comprehensive action plan
to address these issues
and is contained within the
There is a range of
assurance sources
across the three
lines of defence
however BV report
flagged scope for
improvement in
relation to
community
engagement – this
is currently being
considered by a
Scrutiny topic. 
Page 97

Page 98

Best Value action plan to
‘Work with communities
and community groups to
improve engagement’
- Engage with
communities to
understand and improve
levels of satisfaction with
council services in order to
understand and address
their concerns.
- Improve the quality of
engagement with our
communities and reflect
this in service
improvements.
- Implement a programme
to improve engagement
skills across the
organisation.
Progress on all of these
areas are reported
annually to Committee.
Scrutiny
 Scrutiny – Community Asset
Transfers (2021/22)
Future
 Customer Service Centre
(2022/23) 
6 Service Delivery 
Insufficient resources
to ensure effective
service delivery
Green
6
 Performance
Improvement
Framework
 Rolling out programme
of service self-
assessment
 Service improvement
 Performance
reporting to A&SC,
Service
Committees and
Area Committees
 LGBF Review to
A&SC, Service
Internal Audit
 Performance Mgt (2018/19
- High)
 Complaints Handling
(2021/22 – High)
 IA annual plan is risk
There is a range
of assurance
sources across
the three lines of
defence however
BV report has
highlighted
Page 98

Page 99

plans
 Workforce planning
 Complaints process
 Use of LGBF
 Strategic  Plans with
Success Measures
aligned to Business
Outcomes
 Performance
Improvement Officers 
Committees and
Area Committees
 Self-Assessments
reported to SMT
and A&SC 
based but also designed to
provide annual coverage
of all Heads of Service
External Audit
 Best Value Assurance
Report (May 2020)
highlights that there is
limited evidence of the
Council using performance
information to drive
improvement and that
Council’s performance
reporting makes it difficult
to conclude what progress
has been made against its
six corporate outcomes 
Future
 Review of Council’s
Performance Mgt
Framework  being carried
out by CE Unit 
performance
management as
an area for
improvement –
there is an
ongoing project
to review the
Council’s PM
framework (Oct
2020 – June
2022).
7 Health and Social
Care Partnership 
Failure to deliver
strategic objectives
and integrate Health
and Social Care
services in an
efficient and effective
manner exposes the
Council, as a key
partner, to
unacceptable
financial and
reputational risk.
Amber
12
 Strategic Plan
 Integration Scheme
 IJB has elected
member representation
including Council
Leader
 Elected member
representation on IJB
Audit Committee (inc
Vice Chair)
 Council’s CIA regularly
attends IJB Audit
Committee
 Regular engagement
between Council CFO
and HSCP CFO 
 Performance and
financial
monitoring and
reporting in place
and reported to
IJB Board
 HSCP Chief
Officer sits on
Council’s ELT 
Internal Audit
 The IJB has their own IA
function provided by the
Council’s IA function
(Contract started 1 April
2021)
 Council’s IA function also
provide assurance over 
social work services on an
annual basis 
 Internal Audit -  Charging
for Non-Residential
Services (2020/21 –
Substantial) 
 Child Protective Services
(2021/22)
 Care Programme
Approach (2021/22)
 Complaints handling 
There is a range
of assurance
sources across
the three lines of
defence
Page 99

Page 100

(2021/22 - Limited)
 Workforce Planning
(2021/22) 
External Audit
 IJB’s external auditors are
Mazars from October 2022 
Future Internal Audits
 Client Funds (2022/23)
 Learning and physical
Disabilities Care Packages
(2022/23) 
8 Civil Contingency &
Business continuity
arrangements are
not effective.
Green
6
 Critical activity
recovery plans
 Emergency planning
test events
 West of Scotland local
resilience partnership
 Community resilience
plans
 EU withdrawal tactical
group 
 Emergency Mgt
Support Team
 EU tactical group
progress reported
to SMT
Internal Audit
 Business Continuity
(2019/20 - Reasonable)
 Internal Audit -  Disaster
Recovery Planning
(2020/21 - Limited)
 Internal Audit – Civil
Contingencies (2021/22-
Substantial) 
Limited third level
of defence
assurance at
current time.
2019/20 and
2020/21 audits
highlighted
issues regarding
how robust
CARPs were and
a need for testing
of DRPs. This is
an area that will
merit a follow up
audit in the
medium term
future. 
However
assurance can be
taken from the
Council’s
response to
COVID which
was fast paced
and has proven
to be effective. 
Page 100

Page 101

9 Welfare Reform 
Implementation of
welfare reform is not
managed well
resulting in increased
poverty and
deprivation or short
term crisis
Green
6
 Welfare Reform
Working Group
(WRWG)
 Joint working with DWP
and CPP
 Rent aligned with local
Housing Allowance to
increase affordability. 
 WRWG report to
SMT
 SMT monitor of
risk and consider
high and medium
hardship cases
 Anti-poverty
strategy approved
by Council
 Child poverty
action planning
monitored by
WRWG
Internal Audit
 HB & CTR (2018/109 –
Substantial)
 Internal Audit -  Scottish
Welfare Fund (2020/21 -
Substantial)
 Internal Audit -  Welfare
Rights (2020/21 -
Substantial) 
There is a range
of assurance
sources across
the three lines of
defence
10 Waste Management 
Unable to dispose of
waste in landfill sites
due to the
implications of the
biodegradable
municipal waste
(BMW) landfill ban in
2021
Red
16
 Council rolling out new
waste strategy
 Using education and
publicity to increase
recycling 
 Performance
reporting to EDI
Committee
 Progress
monitoring by
DMT and SMT 
Internal Audit
 Waste Mgt (2018/19 -
Limited) 
Scrutiny
 Waste Mgt Strategy
(2020/21) - On 27 April
2021 the Head of Roads
and Infrastructure Services
provided a presentation to
the A&SC regarding the
Council’s Waste Strategy
followed by a question and
answer session. Following
the presentation the A&SC
members agreed they
were assured that
appropriate progress was
being made in relation to
the Council’s waste
strategy and that inclusion
of a specific scrutiny topic
focusing on the Strategy
would not add value at this
time.
 A briefing note was
requested by the A&SC in
June 2022 relating to
Waste Mgt and to be
presented by the HoS in
Assurances over
this risk are
currently
moderate due to
the Council’s
Waste Strategy
being in its
infancy and the
full impact of the
BMW ban still to
be realised.
However full
implementation is
not till 2025. The
A&SC
determined they
are content that
progress is
reported to the
EDI Committee
and that the
A&SC will
maintain a
watching brief.
Page 101

Page 102

September 22. 
11 Service Delivery -
Cyber Security 
Unable to deliver
services to
customers because
of  failure of ICT
systems following
major cyber security
breach
Red
15
 ICT Security &
compliance officer in
post, producing weekly
threat analysis.
 Regular patching
regimes in place
 ICT Disaster recovery
plans tested regularly
 Critical activities have
recovery plans
developed (CARP’s) 
 Progress
monitoring by
DMT and SMT 
Internal Audit
 Business Continuity
(2019/20 - Reasonable)
 Disaster Recovery
Planning (2020/21 -
Limited) 
Other Agencies 
 PSN and Cyber Essentials
Plus accreditations for
corporate network (doesn’t
cover education network) 
Future
 Internal Audit – Cyber
Security (2022/23) 
Assurances over
this risk are
currently
moderate due to
audits
highlighting 
issues regarding
how robust
CARPs were and
a need for testing
of DRPs. This is
an area that will
merit a follow up
audit in the
medium term
future. 
12 Withdrawal from
the EU                 
Insufficient
preparedness for exit
from the European
Union
Amber
10
 Establishment of
tactical team with direct
reports to Chief
Executive as Strategic
Lead
 Tactical team via the
Civil Contingencies
Manager liaising/
collaborating with
Regional Resilience
Partnerships and other
resilience partners.
 Risk register and
action plan in place
and monitored
regularly by Tactical
Group 
 Regular
reporting to the
SMT and the
Industry and
Regional
Development
Sounding Board
as the strategic
group. 
Internal Audit
 Ongoing assurance –
Previous CIA sat on EU
withdrawal tactical team
Group through role as
Interim Head of Financial
Services. 
There is a range
of assurance
sources across
the three lines of
defence. 
Page 102

Page 103

13 Impact of COVID -
19 
The Council are
unable to deliver
core services as a
result of Covid-19
virus with adverse
impact to community,
the economy 
Amber
12
 Establishment of
Strategic and Tactical
Groups with links to
HSCP, NHS and
national/regional
resilience groups
 Tactical team via the
Civil Contingencies
Manager liaising/
collaborating with
Regional Resilience
Partnerships and other
resilience partners.
 Development and
delivery of an
integrated approach to
deliver decisions and
mitigations
 Development and
Economic Growth
Recovery Working
Group established
 Economic Recovery
Plan approved
 Return from lockdown
group established
which served its
purpose and was
superseded by
Recovering Council
Group to take more
strategic and longer
term view of re-
establishing Council
Services
 Regular
reporting to the
ELT/SMT
 Economic
Recovery Plan
and wider
economic
activity reported
to BCC
 Throughout
peak of COVID
weekly u[dates
from Tactical
Group to
Strategic Group
with key activity
and decisions
reported on to
Leadership
Group
Internal Audit
 Previous CIA contributed
to Strategic Group through
role as Interim Head of
Financial Services and
also sits on the
Development and
Economic Growth
Recovery Working Group.
 Use of Covid-19 funding –
Early Years (2022-23) 
There is a range
of assurance
sources across
the three lines of
defence. 
Page 103

Page 104

This page is intentionally left blank

Page 105

ARGYLL AND BUTE COUNCIL  AUDIT AND SCRUTINY COMMITTEE
CHIEF EXECUTIVE  15 SEPTEMBER 2022 
STRATEGIC RISK REGISTER 
1.0  INTRODUCTION 
1.1  This report provides members with an update on the Council’s Strategic Risk
Register (SRR). 
2.0 RECOMMENDATIONS 
2.1 It is recommended that the Audit and Scrutiny Committee endorse the updated
SRR (Appendix 1).  
3.0 DETAIL
3.1 The Council’s Constitution requires the Chief Executive to attend one meeting
of the Audit and Scrutiny Committee per annum to report on how the Council
is addressing its key strategic risks and other matters of interest.  Paul
Macaskill, Chief Internal Auditor (CIA) will present the update on behalf of the
Chief Executive.   
3.2 The format of the SRR and the Operational Risks Registers (ORR) and the
processes to monitor and update them were revised in 2018 and subsequent
internal audit reviews have confirmed compliance with these procedures. 
3.3  The Council’s SRR continues to be updated by the SMT on a bi-annual basis
on dates agreed with the CIA however it will also be updated if and when the
Strategic Management Team (SMT) feel there is a specific requirement. 
3.4 As required by the revised risk management manual, the SMT also review all
risks in the ORRs which have been classified as ‘red’ by the Departmental
Management Teams (DMT) to determine whether they should be escalated
to the SRR. 
3.5 The CIA performs an annual strategic risk register assurance mapping
exercise which enables the Committee to assess the levels of assurance it
can take over the activity undertaken by the Council to manage its strategic
risks.  This, alongside the annual Internal Audit plan including a three year
cycle providing audit coverage across all the identified risks, provides
assurance that the Council continues to proactively manage its risks.   
3.6 Appendix 1 to this paper provides a copy of the current SRR and
demonstrates how the Council are treating the identified risks in terms of the
Page 105 Agenda Item 11

Page 106

mitigations currently considered to be in place and the action being taken to
further reduce the residual risk. 
4.0 CONCLUSION 
4.1 The SRR is subject to regular review by the SMT as are the red risks
highlighted in ORRs by the DMTs. Risks are actively managed to reduce their
impact upon the Council and the likelihood of them being realised. 
5.0 IMPLICATIONS 
5.1 Policy – None
5.2 Financial - None directly from this report however effective risk management
assists with effective governance and stewardship of Council resources
5.3 Legal – None
5.4 HR - None
5.5 Fairer Scotland Duty - None
5.5.1 Equalities – None
5.5.2 Socio-Economic Duty – None
5.5.3 Islands Duty - None
5.6 Risk – The report sets out the strategic risks facing the Council
5.7 Customer Service - None 
Pippa Milne
Chief Executive
15 September 2022 
For further information please contact: 
Paul Macaskill, Chief Internal Auditor (01546  604108) 
Appendices:
1. Strategic Risk Register 
Page 106

Page 107

NEXT REVIEW DATE February 2023
Imp Like Sc Imp Lik Sc
1
Population and Economic
Decline
Failure to identify relevant
factors contributing to the
decline and failure to
develop strategies and
actions targeting these
factors.
Our Economy is
diverse and thriving
Population decline reduces available funding
impacting on Councils capacity to deliver
services.
A circle of decline with reduced employment,
lower earning and failing businesses and poor
perception of the area.
Combined population and economic decline
may increase the need for and cost of services.
Insufficient people of working age with
appropriate skills and experience to fill
vacancies across CPP.
Residual impact of withdrawal from EU.
Insufficient housing infrastructure to meet long
term demands for those seeking refugee status.
5 4 20
1. Local outcome improvement plan targets population
and economic recovery
2. Maximise external funding opportunities
3. Economic Strategy
4. Strategic infrastructure plan
5. Area economic development action plans
6.Promote and Market Argyll and Bute
7. Maximise social-eco benefits via effective partnership
working
8. Single Investment Plan
9. Refugee sponsorships are fully supported
10. Temp accommodation is in place for all refugees
4 4 16 Treat
1. Lobbying activity in pursuit of regional
immigration policies and related strategies
2. Rural Growth Deal Outline Business Cases and
Final Business Cases to be developed in 2022/23
and Deal to be signed late 2022 or early 2023.
3. Submission of Levelling Up Fund bids by
required timescale of 2 August are nearing
completion as at end of July (submission date
amended by UK Government).
4. Settlement Officer post agreed to be funded
50:50 from HIE/Council focusing on barriers to
people living in communities, housing and
others.  Recruitment carried out and officer
commenced post.
5. Preparation of a pipeline of projects across
Argyll and Bute in order to be able to react to
any other bid funding as and when it is
announced.                                
6. UK Shared Prosperity Fund Investment Plan
for next 3 years prepared and submitted to
Policy and Resources Committee on 11th August
2022 - next iteration will provide further update.
7. Multi-agency approach to refugee settlement
underway linking with national processes and
agendas.
SMT 29 August 2022 Kirsty
Flanagan
2
Condition and suitability
of Infrastructure & Asset
Base
Infrastructure and asset
base does not meet
current and future
requirements and is not
being used or managed
efficiently and effectively.
Our Infrastructure
supports sustainable
growth
Infrastructure and asset base does not support
or is not aligned to business outcomes and
does not aid effective service delivery.
Infrastructure and asset base is allowed to
deteriorate resulting in cost, lost opportunities
and wasted resource.
4 4 16
1.Asset management board
2.Robust capital planning and monitoring
3. Asset management work plan
4. Business case modelling including sustainability,
development and strategic change
5. Intelligence and best practice sharing via Heads of
Property Group.
6. Community Empowerment and Community Asset
Transfer – Arrangements in place to evaluate and
determine requests.
7. Roads Asset Management Plan
8. Status and Options Report
9. R&A Services control hub and joint operations team
10. One Council Property Approach
4 3 12 Treat
1. Development of capital strategy in 2022.
2. 'Modern Workspace Programme will review,
engage and rationalise property portfolio for
future needs of the Council.  Changes will take
place on phased and town by town basis.
Programme will be running for 3 years - April
2024
SMT 29 August 2022 Kirsty
Flanagan and
Douglas
Hendry
STRATEGIC RISK REGISTER
Key Actions and Deadlines Risk OwnerGross Risk Residual Risk Last ReviewedNo Risk Consequences Current Mitigation ApproachCorporate Outcome
Page 107

Page 108

Imp Like Sc Imp Lik Sc
Key Actions and Deadlines Risk OwnerGross Risk Residual Risk Last ReviewedNo Risk Consequences Current Mitigation ApproachCorporate Outcome
3
Financial Sustainability
Insufficient resource to
meet current and future
service requirement.
Budget not aligned / does
not support business
outcomes.
Enablers Unable to deliver Local outcome improvement
plan.
Reduction in performance.
Reputational damage.
4 4 16
1. Longer term financial planning and financial strategy
2. Income generation activity
3. Robust budget preparation and budget monitoring
protocols
4. Maintaining adequate contingency with reserves.
5. Digital transformation
6. Effective workforce planning model
7. Business Outcomes
8.  Financial Services resilience building project including
knowledge sharing and development of guidance notes
4 3 12 Treat
1. Discussions are continuing in respect of a
change programme that will include ensuring
that the Council can operate within its budget
(2022 for year 2023/24).
2.Rural Growth Deal Outline Business Cases and
Final Business Cases to be developed in 2022/23
and Deal to be signed late 2022 or early 2023.
3. Implementation of new general ledger system
with enhanced budget planning and forecasting
capabilities (July 2022)
4. Investment in professional training through
Grow Our Own Activity.
5. Officers considering implications of service
concessions guidance and capital accounting
review Terms of Reference and how that
impacts future financial sustainability.
SMT 29 August 2022 Kirsty
Flanagan
4
Governance and
Leadership
Governance and leadership
arrangements are not
conducive to effective
working and lead to a lack
of strategic direction.
All Corporate Outcomes Poor decision making, lack of strategic
direction.
Lack of operational direction.
Confidence in, and reputation of, the Council
harmed.
Deterioration in performance
4 4 16
1. Administration in place with working majority
2. Members Seminar programmes
3. Mentoring and Coaching Support for policy leads and
Senior Management
4. Priorities agreed by Council
5.Corporate Plan sets out objectives
6. Performance Improvement Framework and Service
Planning.
7. Leadership development programme.
8. Council constitution regularly reviewed and updated.
9. Established partnership governance arrangements
10. Scrutiny arrangements in respect of Police, Fire and
Health.
11. Governance arrangements for scrutiny established
4 2 8 Treat
1. Monitor delivery of BV action plan (ongoing
date)
SMT 29 August 2022 Pippa Milne
5
Engagement and
Understanding the needs
of the Community
The Council fails to
understand service user
needs and emerging
demographic trends and
does not align service
delivery to meet these.
People live active,
healthier and
independent lives
Enablers
Prioritisation of services may not be aligned to
community needs/views
Gaps between community needs and Council
services.
Ineffective partnership working
Services not configured to meet user/citizen
requirements
3 4 12
1. Community Planning partnership
2. Community Engagement Strategy
3.Customer Service Board
4. Operation and development of panels and forums.
Young people’s plan, citizens panel
5. Budget Consultation
6.Comprehensive Complaints Protocols
7.Demographic and end user analysis
3 3 9 Treat
1. Deliver agreed actions in BV3 action plan
relating to Work with Communities and
Community Groups to improve engagement -
March 2022
SMT 29 August 2022 Pippa Milne
Page 108

Page 109

Imp Like Sc Imp Lik Sc
Key Actions and Deadlines Risk OwnerGross Risk Residual Risk Last ReviewedNo Risk Consequences Current Mitigation ApproachCorporate Outcome
6
Service Delivery
Insufficient resources to
ensure effective service
delivery
Enablers Services fail to achieve agreed performance
levels and as a result are not contributing fully
to Council objectives
Resources are poorly managed with result that
agreed outcomes and objectives are not fully
achieved.
Unable to achieve continuous improvement
and improve effectiveness and efficiency
3 3 9
1. Performance Improvement Framework
2.Service Improvement plans
3.Argyll and Bute Manager programme
4. Customer needs analysis Protocols
5.Demographic and end user analysis
6.Workforce Planning
7.Internal and External Scrutiny Arrangements
8.Complaints process
3 2 6 Treat
1. Monitor progress of performance mgt project
and implement recommendations  (Ongoing
from Oct 2020 to Sept 2022)
2. Budget approach being developed to look at
longer term rather than 1 year focus - will be
discussed at first Budget Working Group meeting
in September.  The approach looks at
duties/powers and discretionary services.
SMT 29 August 2022 Kirsty
Flanagan and
Douglas
Hendry
7
Health and Social Care
Partnership
Failure to deliver strategic
objectives and integrate
Health and Social Care
services in an efficient and
effective manner exposes
the Council, as a key
partner, to unacceptable
financial and reputational
risk.
People live active,
healthier and
independent lives
Partnership viewed as having failed or not
achieved strategic objectives Partnership
Failure or weakness exposes Council to
significant Financial liability
Confidence in, and reputation of, the Council
harmed
Unclear repercussions of financial and staffing
effects of the implementation of the National
Care Service on the Council and HSCP
Residual Covid-19 implications for ongoing
health and social care services
5 4 20
1. HSCP integration scheme approved by Scottish
government
2. Strategic Plan in place
3. Performance and Financial reporting arrangements in
place
4. Independent audit arrangements in place.
5. Integrated Joint board with elected member
representation including Council Leader
6.Chief Officer member of ABC Senior Management Team
with co-location of officers
7. Tripartite leadership agreement
8. Monitoring of HSCP financial position.
9. Medium term Financial Plan in place.
10. Establishment of Strategic and Tactical Groups with
links to HSCP, NHS and national/regional resilience groups
4 3 12 Treat
1. Develop options to deliver sustainability of
future years budgets (ongoing)
2. Develop a long term Financial plan.
3. Assessment on impact of COVID on services in
short, medium and long term.
4. Financial assessment of the financial
implications on the Council of services
transferring to the NCS.
5. Development and regular review of Economic
Recovery workstream  with input from
representatives across the organisation and the
Health and Social Care Partnership.
SMT 29 August 2022 Fiona Davies
and Pippa
Milne
8
Civil Contingency &
Business continuity
arrangements are not
effective.
People live in safer
and stronger
communities
Ineffective management of major emergencies
affecting Council services and communities in
Argyll and Bute.
Incident and recovery phase of an emergency
lead to greater inconvenience and hardship
and a longer timescale for return to normal.
Council unable to effectively deliver its own
services
2 4 8
1. Emergency Planning Test events
2. Critical Activity Recovery Plans
3. Roll out of Community resilience partnership
programme
4. Peer review of major exercises undertaken to provide
external validation of planning process
5. West of Scotland local resilience partnership
6.Cross sector expertise and partnership working
7. Emergency Management Support Team (EMST)
meetings
8. Training
9. EU Withdrawal Tactical Working Group with
arrangements for reporting to the West of Scotland
Resilience Partnership
2 3 6 Treat
1. ‘Develop long term test schedule for DRPs to
be presented to the SMT (December 2021) -
UPDATE?
SMT 29 August 2022 Douglas
Hendry
Page 109

Page 110

Imp Like Sc Imp Lik Sc
Key Actions and Deadlines Risk OwnerGross Risk Residual Risk Last ReviewedNo Risk Consequences Current Mitigation ApproachCorporate Outcome
9
Welfare Reform
Implementation of welfare
reform is not managed
well resulting in increased
poverty and deprivation or
short term crisis
People live active,
healthier and
independent lives
Financial crisis and hardship for individuals
Increase in demand or costs for Council
Services
4 3 12
1. Financial Inclusion and Advice Group established
2. Joint working with DWP, CPP and other agencies
3. Child Poverty Planning Group set up and active
4. Flexible Food Fund created. Supporting householders in
our area with funds and advice to address food and fuel
insecurities
3 2 6 Tolerate
1. Extend Flexible Food Fund Contract for a
further year to March 2023.
2. Council, HSCP and third sector deliver range of
20 Covid related support projects under the
Flexible Fund banner by March 2023.
3. Deliver sustainable school clothing bank
across the Argyll and Bute area by December
2022.
4. One-off top-up payments of £75 per child
issued to School Clothing Grant recipients by
end of February 2022.
5. Argyll and Bute centric anti-poverty training
delivered to 600 Council, NHS and third sector
staff by March 2022.
6. "Worrying about money" leaflet to be issued
with Council Tax bills containing advice and
support for people with money worries in March
2022. Update website with information and
support.
SMT 29 August 2022 Douglas
Hendry
10
Waste Management
Unable to dispose of waste
in landfill sites due to the
implications of the
biodegradable municipal
waste (BMW) landfill ban
in 2025
Our Infrastructure
supports sustainable
growth
Alternative delivery models would be likely to
be more expensive than the current one which
would result in cost pressures having to be
accommodated by other services and service
provision reduced
5 4 20
1. Helensburgh and Lomond waste solution available via
third party offtakers
2. Waste strategy
4 4 16 Treat
1. Options Appraisal undertaken by external
consultants and will be reported to EDI
Committee in December 2022, which will
determine a compliant solution on the BWN ban
by the deadline of December 2025.
2.  Decision will be required by Council as to
whether they request a derogation in respect of
waste to end the Waste PPP Contract.
3.  Officers are keeping a watching brief on
implications of the Barr Environmental position.
4.  DRS is being reviewed and officers are
keeping a watching brief on this which is due to
be implemented in August 2023 and what
implications this could have for the Council.
SMT 29 August 2023 Kirsty
Flanagan
Page 110

Page 111

Imp Like Sc Imp Lik Sc
Key Actions and Deadlines Risk OwnerGross Risk Residual Risk Last ReviewedNo Risk Consequences Current Mitigation ApproachCorporate Outcome
11
Service Delivery - Cyber
Security
Unable to deliver services
to customers because of 
failure of ICT systems
following major cyber
security breach
Our Economy is
diverse and thriving
Threat of ransomware attacks. Data corruption
of ICT system caused by malware and/or loss of
confidential data.
ICT Systems unavailable for considerable period
whilst recovery from uncorrupted backups
takes place.
Meanwhile Services fail to achieve agreed
performance levels and as a result are not
contributing fully to Council objectives.
Reputational damage to Council and potential
financial losses (fines, loss of income). 5 4 20
1. ICT Security & compliance officer in post, producing
weekly threat analyses, member of CiSP
2. PSN and Cyber Essentials Plus accreditations for
corporate network
3. Regular patching regimes in place
4. ICT Disaster recovery plans tested regularly
5. All critical activities have recovery plans developed
(CARP’s)
6. Review the issuing of regular communications to raise
awareness of importance of cyber security and awareness
again
5 3 15 Treat
1. Review will be ongoing on all contingency
plans with updated knowledge from SEPA and
UHI Cyber Attacks.          
2. Work with Scottish Government Cyber
Resilience Team to test ICT response             
3. Security training videos being issues on a
monthly basis, as mandatory training exercises
for staff                 
4. Enforce password changes when found to be
weak                 
5.  Cyber Resilience Exercise completed in March
2022 followed by a Digital Office led Cyber Risk
session for ELT in April .                
6. Continued close review of disaster recovery
plan and associated tests, finalise and test
incident response procedure, and review of
mirroring between the 2 data centres (monthly
at ITMT) and backup
7. Review and progress requirements for
Education Network to achieve CE+ accreditation
SMT 29 August 2022 Kirsty
Flanagan
12
Cost of Living Crisis
The Council are unable to
respond to the
implications arising from
the 'Cost of Living' crisis
Our Economy is
diverse and thriving
1. Unable to meet demands for assistance
stemming from financial hardship
2. Increases on the demand for Council services
such as homelessness
3. Financial implications for the Council as
revenue income could fall correlating to
financial hardship - Financial Sustainability
4. Implications for staff, particularly those
working from home
5. Adverse impact on workforce, communities
with regards to economy and demographic
statistics 
5 5 25
1. Financial stability and support to HSCP
2. Social Welfare and Poverty Funding assistance.
3. Focused support and multi-agency approach where risk
is highlighted
4. Monitoring of trends in service use to high light any
significant change as a result of financial hardship
5. Targeted measures  - for example to those receiving
Council Tax reductions - via Gift Cards and Flexible Food
and Fuel Fund
4 3 12
Treat 1. Review and monitor changes in demand for
key services which correlate to personal effects
arising from financial distress.
2. Assessment of the 'Cost of Living' crisis on
wellbeing and service capacity/sustainability -
December 2022
SMT 29 August 2022 Pippa Milne
and all ELT
Page 111

Page 112

This page is intentionally left blank

Page 113

ARGYLL AND BUTE COUNCIL  Audit and Scrutiny Committee 
15 September 2022 
Corporate Complaints – Annual Report 2021-22 
1.0 INTRODUCTION 
1.1 The report provides information on how the Council has dealt with
complaints during the period between 1 April 2021 and 31 March 2022 and
performed against the statutory indicators, which have been agreed
between the Scottish Public Services Ombudsman (SPSO) and the Local
Authorities Complaint Handlers Network. 
2.0 RECOMMENDATIONS 
2.1 The Audit and Scrutiny Committee consider and note the content of this
report. 
3.0 DETAIL 
3.1 All Council services follow the SPSO’s model complaint handling
procedure (CHP). A requirement of this model procedure is that the
Council report to the SPSO on a standard set of statutory performance
indicators, and prepare an annual report for consideration by Members. 
The report attached at appendix 1 has been prepared in order to satisfy
this requirement.   
3.2 The scope of this report includes complaints received in relation to Live
Argyll, and also includes complaints which relate to the Social Work
service within Argyll and Bute HSCP 
3.3 The SPSO introduced a new model complaints handling procedure from
01 April 2021, which all local authorities were required to adopt. This
updated procedure incorporates complaints in relation to the Social Work
service, which were previously reported separately, and also introduced a
new complaint outcome where officers can conclude a complaint as
“resolved”. 
3.3 Details around the common themes of complaints, service areas and
further analysis of the root causes of complaints are provided within
Appendix 2 to this report. This additional information is provided to allow
Members to consider this information when reviewing future service
planning and decisions, and more details about specific issues or types
of complaint can be made available if required.  
Page 113 Agenda Item 12

Page 114

3.4 The annual report usually features a section on benchmarking, where we
provide a comparison of data between our “family group”. This data is not
available from the Local Authority Complaints Handlers Network
(LACHN) yet, and will be presented to the Audit and Scrutiny Committee
once it has been circulated by LACHN. 
3.5 The corporate complaints procedure is administered centrally by the
Compliance and Regulatory team within Legal and Regulatory Support,
and quarterly performance reports are provided to departmental
management. Performance reports are published on the Council’s
website:  https://www.argyll-bute.gov.uk/do-it-online/comments-and-
complaints 
3.6 The Compliance and Regulatory team produce monthly performance
update reports, which are circulated to all Heads of Service and
Directors, to draw attention to any areas where complaints performance
may be falling. This includes detailed information, including the ward area
and reasons for late response. 
3.7 It should be noted that the increased number of complaints during 2021-
22 can be attributed to some particular factors:
- Increased staff awareness of the need to capture and record
complaints – training was carried out to support the introduction of the
new complaints handling procedure, which raised awareness
throughout the organisation.  
- Inclusion of Social Work complaints with the local authority procedure,
where these were previously reported separately 
4.0 CONCLUSION 
4.1 The Council has dealt with the majority of complaints it has received in
accordance with the requirements of the complaints handling procedure
and has complied with the obligation to prepare an annual report. Once it
has been presented to the Audit and Scrutiny Committee, the annual
report will be published on the Council’s website.   
5.0 IMPLICATIONS 
5.1 Policy None
5.2 Financial  None
5.3 Legal   Statutory requirement to prepare report
5.4 HR None
5.5.1 Fairer Scotland Duty None
5.5.2 Equalities – Protected
Characteristics
None
5.5.3 Socio Economic Duty None
5.5.4 Islands None
5.6 Risk  None
5.7 Customer Service None 
Page 114

Page 115

Douglas Hendry
Executive Director with responsibility for Legal and Regulatory Support 
22 August 2022                                                  
For further information contact: Iain Jackson, Governance, Risk and Safety
Manager 01546 604188 
APPENDICES 
Appendix 1 – Annual Complaints Report 2021-22 
Appendix 2 – Themes of Complaints   
Page 115

Page 116

This page is intentionally left blank

Page 117

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil … 
.
ANNUAL COMPLAINTS
PERFORMANCE
REPORT 2021/22
Page 117

Page 118

Page 2
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Contents 
Chief Executive’s Foreword ........................................................................................ 3 
Introduction................................................................................................................. 4 
Complaints Process ................................................................................................... 5 
Customer Contact ...................................................................................................... 6 
Indicator 1 – Complaints Received per 1,000 of Population ...................................... 7 
Indicator 2 – Number of Complaints ........................................................................... 8 
Indicator 3 – Complaint Outcomes Stage 1 ................................................................ 9 
Indicator 3 – Complaint Outcomes Stage 2 .............................................................. 10 
Indicator 3 – Complaint Outcomes Escalated Complaints ....................................... 11 
Indicator 4 – Average Times .................................................................................... 12 
Indicator 5 – Performance Against Timescales ........................................................ 14 
Indicator 6 – Extensions to Timescales .................................................................... 16 
Indicator 7 – Customer Satisfaction ......................................................................... 17 
Indicator 8 – Learning from Complaints – Reporting ................................................ 18 
Indicator 8 – Learning from Complaints – Improvements ......................................... 19 
Complaints Investigated by the SPSO ..................................................................... 20 
Complaint Themes ................................................................................................... 21 
Positive Feedback .................................................................................................... 23 
Contact Us ................................................................................................................ 25 
Page 118

Page 119

Page 3
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Chief Executive’s Foreword 
I am pleased to present Argyll and Bute Council’s
Annual Complaints Report, which provides
information about our performance in handling
complaints from our customers between 1 April
2021 and 31 March 2022.  The Scottish Public
Services Ombudsman brought in an updated
complaints procedure, which we successfully
implemented from 1 April 2021. Through this updated procedure, complaints in
relation to our Social Work services are now managed under our overarching
complaints procedure, and we have also started to make use of an alternative
complaint outcome – where complaints can be resolved by our staff taking positive
action and resolving the issue for the customer. 
Argyll and Bute Council is committed to providing high quality services for residents,
businesses and visitors in our area. We strive to be thorough, transparent, objective
and fair in our approach to complaints, and to make it as easy as possible for
customers to access our complaints procedure through our website, by email, over
the telephone or in person. I understand it can be disappointing and frustrating when
your expectations are not met. We welcome and value complaints and feedback
from our customers as it allows us to continue to improve service delivery. Some
examples of those improvements are included within this report. 
It has been a challenging year, as we worked through evolving national rules and
guidance. I thank all the staff in my organisation for doing what they do best and
going the extra distance to provide the best possible services and support to the
people of Argyll and Bute. 
Pippa Milne
Chief Executive – Argyll and Bute Council 
Page 119

Page 120

Page 4
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Introduction 
Argyll and Bute Council, along with all other Scottish Local Authorities, follow a
model complaints handling procedure which is determined by the Scottish Public
Sector Ombudsman (SPSO). This report presents how Argyll and Bute Council has
performed against eight key performance indicators set by the SPSO that are used
by all 32 local authorities, and provides some details about improvements to our
services, along with some positive feedback from our customers. 
Complaints process 
Complaints can be either Stage 1, which are usually straightforward issues and
must be dealt within 5 days or less, or Stage 2, which are usually about more
complex or serious issues and can take up to 20 days for a response to be provided. 
If a customer is not happy with a Stage 2 response, they can refer their complaint on
to the SPSO, who will look at the issues raised and can investigate the matter. 
Stage 1       Stage 2     SPSO
In most cases, a complaint will be made because the customer considers that the
Council has:
 
 Done something wrong
 Failed to live up to expectations
 Treated someone badly or unfairly 
The process map on the following page outlines our process. 
What is a complaint?
A complaint is ‘an expression of dissatisfaction about the Council’s action or lack
of action, or about the standard of service provided by or on behalf of the
Council’.
Page 120

Page 121

Page 5
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Complaints Process 
Page 121

Page 122

Page 6
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Customer Contact 
Argyll and Bute Council has many interactions with customers every day through
various channels including email, telephone and through our website. Complaints
from customers only form a very small number of the interactions that are logged
through our Customer Relationship Management (CRM) system. In 2021/22 Argyll
and Bute Council logged 152,272 incidents through the CRM system. Of these
151,338 incidents, only 700 of these were complaints. This equates to less than
0.5% as shown below. 
152,272
700
Customer Interactions
Total No. Interactions
Total No. Complaints
Page 122

Page 123

Page 7
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Indicator 1 – Complaints Received per 1,000 of Population 
This section details the total number of complaints handled by Argyll and Bute
Council between 1 April 2021 and 31 March 2022. To allow a fair comparison to be
made across all 32 Scottish councils, this indicator looks at the figure of “complaints
per 1,000 of population”.  
This means there were 8.2 complaints per 1,000 population, or roughly 1 resident
in 122 made a complaint about our services. A comparison of this indicator over the
past 3 years is shown in the table below.
 
 
Year  No. of Complaints  Complaints Per 1,000 Population 
 
2021/22  700  8.2 
2020/21  407  4.7 
2019/20  373  4.3 
 
 
 
In 2021/2022 Argyll and Bute 
received, processed and closed 
700  
complaints. 
The population of Argyll and Bute 
is estimated at around 
85,870* 
 
 
Page 123

Page 124

Page 8
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Indicator 2 – Number of Complaints 
This indicator provides information about the number of complaints closed at Stages
1 and 2, and the escalated complaints (when a customer is not satisfied with a stage
1 response, and it goes on to be dealt with as stage 2).    
489 complaints were closed at Stage 1 – 70% 
141 complaints were closed at Stage 2 – 20% 
60 complaints were closed after escalation – 9% 
10 complaints were not closed at Stage 1 within 10 days and were escalated to
Stage 2  
The graph below shows a comparison between the number of complaints received
at each stage over the past 3 years. 
499
141
60
303
67
37
299
47
27
0 100 200 300 400 500 600
Stage 1
Stage 2
Escalated
No. of Complaints
2019/20 2020/21 2021/22
Page 124

Page 125

Page 9
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil … 
Indicator 3 – Complaint Outcomes Stage 1 
With every complaint, we contact the customer and explain what the outcome of
their complaint was — Upheld, Not Upheld or Partially Upheld — and provide details
about how this decision was made.  The charts below provide a comparison of the
outcomes for this year, and over the past 3 years.  The “resolved” outcome was
introduced with the new complaints handling procedure in April 2021, and is used
when positive action can be taken to resolve the issue for the customer. 
 
Upheld
32%
Partially 
Upheld
22%
Not Upheld
33%
Resolved
13%
2021/2022 Outcomes
157
89
106107
78 83
159
136
110
66
2021/22 2020/21 2019/20
Stage 1 Outcomes ‐ 3 Year Comparison
Upheld Partially Upheld Not Upheld Resolved
157 complaints were Upheld at 
Stage 1 – 32% 
107 complaints were Partially 
Upheld at Stage 1 – 22% 
159 complaints were Not Upheld 
at Stage 1 – 33% 
66 complaints were Resolved at 
Stage 1 – 13% 
*Resolved outcome only relevant to 2021/22 data
Page 125

Page 126

Page 10
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Indicator 3 – Complaint Outcomes Stage 2 
Upheld
17%
Partially 
Upheld
46%
Not Upheld
35%
Resolved
2%
2021/2022 Outcomes
24
10 2
65
24
15
49
33 30
3
2020/21 2020/21 2019/20
Stage 2 Outcomes ‐ 3 Year Comparison
Upheld Partially Upheld Not Upheld Resolved
24 Complaints were Upheld at 
Stage 2 – 17% 
65 Complaints were Partially 
Upheld at Stage 2 – 46% 
49 Complaints were Not Upheld 
at Stage 2 – 35% 
3 Complaints were Resolved at 
Stage 2 – 2% 
*Resolved outcome only relevant to 2021/22 data
Page 126

Page 127

Page 11
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Indicator 3 – Complaint Outcomes Escalated Complaints 
When a customer is not happy with a Stage 1 response, it is dealt with as a Stage 2
complaint — these are known as “Escalated Complaints”.
 
 
27%
27%
45%
1%
2021/22 ‐ Outcomes
16
10
2
16 14
8
27
13
17
1
2021/22 2020/21 2019/20
Escalated Outcomes ‐ 3 Year 
Comparison
Upheld Partially Upheld Not Upheld Resolved
16 complaints were Upheld after 
escalation - 27% 
16 complaints were Partially 
Upheld after escalation – 27% 
27 complaints were Not Upheld 
after escalation – 45% 
1 complaint was Resolved after 
escalation – 2% 
*Resolved outcome only relevant to 2021/22 data
Page 127

Page 128

Page 12
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Indicator 4 – Average Times 
Stage 1 – We aim to respond to and close all Stage 1 complaints within 5 working
days. In 2021/2022, we closed 489 complaints at Stage 1, with a total sum of 1,999
working days used to close them. Our average time to close a Stage 1 complaint
was 4.1 working days.
 
The figures for the last 3 years can be seen in the table below.  
Year  No. of Complaints Closed  Total Days 
  Average Time (days) 
2021/22  489  1,999  4.1 
2020/21  303  1491  4.9 
2019/20  299  2214  7.4 
Stage 2 – We aim to respond to and close all Stage 2 complaints within 20 working
days. In 2021/2022, we closed 141 complaints at Stage 2, with a total sum of 3,107
working days used to close them. Our average time to close a Stage 2 complaint
was 22 working days. 
The figures for the last 3 years can be seen in the table below.
 
 
Year  No. of Complaints Closed  Total Days 
  Average Time (days) 
2021/22  141  3,107  22 
2020/21  67  1289  19.2 
2019/20  47  1002  21.3 
 
Monthly performance reporting is provided to all Heads of Service, Directors and 
Complaints Officers to allow them to take action with their Services if required.  
Page 128

Page 129

Page 13
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Indicator 4 – Average Times 
After Escalation – in 2021/2022, we closed 60 escalated complaints after
Escalation, with a total sum of 954 working days. Our average time to close a
complaint after Escalation was 15.9 working days. 
The last three year’s results can be seen below.
 
 
Year  No. of Complaints Closed  Total Days 
  Average Time (days) 
2021/22  60  954  15.9 
2020/21  37  604  16.3 
2019/20  27  400  15.4 
 
Page 129

Page 130

Page 14
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Indicator 5 – Performance Against Timescales 
Stage 1 – We aim to respond to and close all Stage 1 complaints within 5 working
days. In 2021/2022, we closed 489 complaints at Stage 1 with 411 of these within
timescale, or 84%. 11 (2%) were closed after an extension was agreed with the
customer.  
 
No. of Complaints Closed  Within Timescale 
  %  No. with Extension  % 
2021/22  489  411  84%  11  2% 
2020/21  303  232  77%  8  3% 
2019/20  299  206  68.9%  8  2.7% 
Stage 2 – we aim to respond to and close all Stage 2 complaints within 20 working
days. In 2021/2022, we closed 141 complaints at Stage 2, with 93 of these within
timescale, or 66%. 35 (25%) were closed after an extension was agreed with the
customer.  
 
No. of Complaints Closed  Within Timescale 
  %  No. with Extension  % 
2021/22  141  93  66%  35  25% 
2020/21  67  46  69%  11  16% 
2019/20  47  26  55.3%  10  21.3% 
 
Complaints with extensions agreed do not count as within timescale, these are  
reported as late responses.  
Page 130

Page 131

Page 15
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Indicator 5 – Performance Against Timescales 
After Escalation – in 2021/2022, we closed 60 complaints after Escalation, with 48
of these within timescale, or 80%. 8 (13%) were closed after an extension was
agree with the customer.  
 
No. of Complaints Closed  Within Timescale 
  %  No. with Extension  % 
2021/22  60  48  80%  8  13% 
2020/21  37  23  62%  3  8% 
2019/20  27  20  74.1%  2  7.4% 
Page 131

Page 132

Page 16
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Indicator 6 – Extensions to Timescales 
Part of the complaints handling procedure includes the option to seek an extension
to the usual 5 or 20 day timescale, which should be agreed with the customer. This
indicator reports the number and percentage of complaints at each stage which
were closed after an extension to the 5 or 20 day timeline was authorised.
 
 
 
 
 
 
 
 
 
Stage 1 
11 Extensions agreed 
2% of total complaints 
 
 
 
 
Escalated complaints 
8 extensions agreed 
13% of total complaints 
 
 
Stage 2 
35 extensions agreed 
25% of total complaints 
Page 132

Page 133

Page 17
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Indicator 7 – Customer Satisfaction 
Our customers are automatically issued with a short complaints process satisfaction
survey once their complaint has been closed. The survey asks for feedback about
the complaints process, and gives an opportunity to send us suggestions for
improvements.  The survey results are reviewed by the Complaints Co-ordinators
quarterly, and the feedback can be used to improve how we handle complaints. 
We received 72 responses to our survey during the year, which is just over 10% of
all complaints received. A low response rate makes it difficult to get an accurate
picture of how all of our customers feel about the complaints process. 
67% of customers who responded to the survey indicated that they felt their
complaint had been dealt with fairly. 
53% of customers were very satisfied or satisfied with the complaints process.   
From our review of the feedback provided through the surveys, we recognise that
customers are often frustrated when an ongoing issue is not resolved through the
complaints process.  
Page 133

Page 134

Page 18
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Indicator 8 – Learning from Complaints – Reporting 
Who looks at our complaints figures and trends?
 
Information about complaints figures and corrective action taken is reported
regularly to senior managers and a quarterly report is submitted to the Strategic
Management Team. This process ensures the appropriate level of scrutiny takes
place.  
Quarterly performance against the performance indicators is reported to the Local
Authority Complaints Handlers Network (LACHN). 
We are also required to report our complaints figures to the Scottish Public Service
Ombudsman (SPSO) by submitting an annual return.    
How we report Complaints Performance and Trends to our Customers 
We publish the quarterly and annual reports on our website: https://www.argyll-
bute.gov.uk/do-it-online/comments-and-complaints 
Page 134

Page 135

Page 19
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Indicator 8 – Learning from Complaints – Improvements 
By dealing with complaints on a day-to-day basis, our Officers are able to make
adjustments to processes when issues are raised. In general, no major policy or
procedural changes were required in response to complaints, however, a number of
minor changes or actions were taken in order to improve our services. Whilst these
improvements may have been minor in the overall scale of activities within the
Council, it is our hope that they have made significant changes to the quality of
service received by our customers. Occasionally we see a more significant change
in process following receipt of a complaint, and one example of this is shown below: 
Departmental Complaints Co-ordinators attend regular meetings where learning
points from the SPSO are shared and discussed. The feedback and suggestions
from customer satisfaction surveys are also reviewed, and any potential
improvement ideas are investigated and taken forward where appropriate.   
 
 
Customer wanted to make a complaint about waste that was being left behind by carers visiting a 
neighbour. Resolved – Contact made with the provider of Home care services who visited the site 
immediately in preparation of cleaning up if needed. The site was clear as bins had been emptied this 
morning. Care staff attending have been reminded to be more vigilant in ensuring the tied waste bags 
are secured within the actual bin as being exposed by an open bin lid is leading to high winds blowing 
the waste bags into neighbouring properties. Contact by phone was made to the complainant who was 
happy with the action taken. The main issue we are experiencing in Home Care is the change to waste 
bins being emptied every 3 weeks. Although some of our clients have been issued with 2 bins this is not 
sufficient and leads of overflow. Clients in receipt of high levels of home care such as 4/5 visits per day 
by two carers generates a lot of PPE and clinical waste and often the capacity of 2 bins is not sufficient. 
Contact was made with colleagues in Amenity Services to discuss waste options and larger capacity bins 
are now being discussed for clients receiving home care services. 
 
 
 
Page 135

Page 136

Page 20
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Complaints Investigated by the SPSO 
When a customer is not satisfied with our final response to a complaint, they can
take it to the Scottish Public Service Ombudsman (SPSO) and ask for the complaint
to be investigated. The SPSO is the final arbiter for complaints about public
services.
  
Cases passed to SPSO during 2021/2022 
23 cases were received by the SPSO in relation to Argyll and Bute Council in
2021/2022. Of these, 4 were not progressed as they were either: premature (the
complaint had not been taken through the Council’s process first); withdrawn; or
were outwith the SPSO’s jurisdiction. 16 cases were resolved early—when the
SPSO receives a complaint they ask the Council to provide information in
connection with the complaint, and from that information the investigating officer
decides whether the complaint should be pursued further. If they are satisfied that
the Council dealt with the complaint appropriately, it does not proceed to the full
investigation stage. 3 complaints were investigated by the SPSO, 2 of which were
fully upheld and 1 was partially upheld. 
The SPSO publishes reports about all the organisations it has involvement with.
More information is available from Statistics 2021-22 | SPSO 
Page 136

Page 137

Page 21
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Complaint Themes 
We record information about what type of complaints we receive, and have a standard set of 
categories that complaints generally fall into. The chart below shows how the complaints 
received have been classified during 2021-22. 
 
 
 
*Note – the total here does not directly correspond with the total number of complaints, due to how escalated
complaint categories are recorded 
12
48
15
144
29
275
121
0 50 100 150 200 250 300
Damage/Injury
Inadequate Information
Late Delivery
Non Delivery
Policy Restriction
Substandard Delivery
Unacceptable Behaviour
Number of Complaints
Page 137

Page 138

Page 22
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
We have also captured information about what we believe the main theme of each
complaint to be. This information will be provided (along with other levels of
analysis) to our Elected Members and Senior Management to allow them to take this
into consideration when making policy and service decisions. The chart below
shows the main issues we have received complaints about. It includes all complaints
where we received 5 or more in connection with a particular issue.   
5
5
6
6
6
6
6
6
7
8
9
9
10
10
12
12
13
14
14
16
16
16
17
21
24
30
30
36
45
51
93
0 10 20 30 40 50 60 70 80 90 100
Council Property/Buildings
Public Health
Benefits
Civic Amenity
Council Decision
Council Payments
Public Transport
Traffic Management
Road Works
Pothole
Cemeteries
School Transport
Council Service Error
Public Conveniences
Quality of Care
Staff Issue - Other
Social Work Decisions
Commercial Refuse
Ground Maintenance
Education - Treatment of Child
Failure of Care
Recycling
Street Lighting
Planning Applications
Council Tax
Education - Other
Missed Bin
Parking Services
Staff Issue - Communication
Staff Issue - Conduct
Domestic Refuse Collection
No. of Complaints
Page 138

Page 139

Page 23
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Positive Feedback 
I've been extremely pleased with the service I received from all of the council people I've had to
speak to regarding applications for various things and queries I've had. Everything has been dealt
with very efficiently, very professionally and in a really courteous, excellent manner and my grateful
thanks.
The person who helped me get my bin sorted and like understand my Council Tax was just
wonderful and made what I was kind of dreading calling the council such a wonderful experience
and so you have a real gem on your hands
Everybody that I speak to at Argyll & Bute Council are so so helpful and can't do enough for you.
Thank you
I was delighted with the service, very professional, very polite, very informative, couldn't fault them,
very good. 
Here is just a small extract of the positive 
feedback that we have received this year. It 
is important to recognise that excellent 
services are being delivered, often in very 
challenging circumstances. 
 
 
We had such a wonderful day and our wedding service was absolutely perfect. From the moment
we first enquired, the staff at the registry office were professional, helpful and caring. They made
the process so very easy and we would not hesitate to recommend getting married on the Isle of
Mull to everyone. Thank you to the team at Tobermory!
Page 139

Page 140

Page 24
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil … 
I was greeted by staff at the front desk and pointed to the counter were I needed to go. The staff were
friendly and helpful and I didn’t have to wait about
I've just recently moved into Helensburgh and now deal with Argyll & Bute Council. I would just like to
say how absolutely wonderful the service has been on any occasion I've had to speak to your staff and
a big thanks to the lady today who couldn't be more helpful and I very much appreciate it. Thanks
Islay and Argyll & Bute Registrars have to be the most informative  helpful and polite service around. 10
out of 10
I'm highly delighted with your caller, she was very kind, very professional, very compassionate and kind
and I can only say that good lady and her colleagues should be getting double money. God bless you,
thank you,
Really swift and efficient and friendly service from your team, knowledgeable about what was going on
so really appreciated that. Made the call nice and easy and easy to action with what happens, sending
out a form so really helpful, really happy thank you.
Page 140

Page 141

Page 25
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Contact Us 
Thank you for looking at our annual complaints report for 2021-22. If you would like
to know more about our complaints procedure, details can be found on our website:  
 
https://www.argyll-bute.gov.uk/do-it-online/comments-and-complaints 
Or you can contact us using any of the methods below.  
Phone – 01546 605522 
Text – 07860023933 
Post – Argyll and Bute Council, Kilmory, Lochgilphead, Argyll, PA31 8RT 
Email - enquiries@argyll-bute.gov.uk  
Online - http://www.argyll-bute.gov.uk/content/enquiriesform   
Page 141

Page 142

This page is intentionally left blank

Page 143

Page 1  Annual Complaints Report 2021‐22  Appendix 2 
 
Annual Complaints Performance 2021‐22 
 
This report provides additional details to accompany the full annual complaints report for 2021‐22, which is based on 
the 8 indicators set by the Scottish Public Service Ombudsman (SPSO). 
 
1. All Complaints listed by theme 
 
Complaint theme  Number 
Piers & Harbours  3 
Private Sector Grants  3 
Benefits Other  3 
Play Parks  3 
Pavements/Footpaths  3 
Care Funding  3 
Road Closure  2 
Committee/Governance  2 
Homelessness Service  2 
Disabled Parking Bays  2 
Building Warrants  2 
Enforcement  2 
Road Signage  2 
Special Uplift  2 
School Catering  2 
Dangerous Buildings  2 
Local Development Plan  2 
Fly Tipping  1 
Street Sweeping  1 
Leisure Services  1 
School Crossings  1 
Live Argyll ‐ Other  1 
Dog Fouling  1 
Pest Control  1 
Scottish Welfare Fund  1 
Benefits Payments  1 
Fleet  1 
Road Markings  1 
HR Policy/Process  1 
Benefit Payments  1 
Speed Limits  1 
Landlord Registration  1 
Table 1 provides a full breakdown of complaints into 
relevant themes. From the data in the complaints 
system, we have assigned each case a theme, based 
on our understanding of the main issue raised in the 
complaint. Where complaints have been in connection 
with a number of issues, or could fall into various 
themes, we have assigned it the theme we believe to 
be the main issue. The larger themes are explored 
further within this report. 
Complaint theme  Number 
Domestic Refuse Collection  93 
Staff Issue ‐ Conduct  51 
Staff Issue ‐ Communication  45 
Parking Services  36 
Education ‐ Other  30 
Missed Bin  30 
Council Tax Other  24 
Planning Applications  21 
Street Lighting  17 
Recycling  16 
Education ‐ Treatment of Child  16 
Failure of Care  16 
Ground Maintenance  14 
Commercial Refuse  14 
Social Work Decisions  13 
Quality of Care  12 
Staff Issue ‐ Other  12 
Public Conveniences  10 
Council Service Error  10 
School Transport  9 
Cemeteries  9 
Pothole  8 
Road Works  7 
Public Transport  6 
Council Payments  6 
Traffic Management  6 
Civic Amenity  6 
Council Decision  6 
Council Property/Buildings  5 
Public Health  5 
Winter Maintenance  4 
Litter  4 
Flooding  4 
Drainage  4 
Surfacing  4 
Projects, Renewables & Regeneration  4 
Non Domestic Rates  3 
Cost of Council Service  3 
Noise Control  3 
Data Protection  3 
Page 143

Page 144

Page 2  Annual Complaints Report 2021‐22  Appendix 2 
 
 
 
2. General breakdown by complaint category and department 
 
Details about some of the larger themes / areas of complaints are provided in this section.  A more in depth 
breakdown within the main service areas is provided at section 4 below 
 
Table 1 – Categories of complaints by department 
 
Complaint category 
Chief 
Executive’s 
Unit, 
Financial 
Services & 
Community 
Planning 
Education, 
Legal & 
Regulatory 
& 
Commercial 
Customer Support, 
Road and 
Infrastructure & 
Development & 
Economic Growth 
Health and Social 
Care Partnership  LiveArgyll 
Damage/Injury    3  9   
Inadequate 
Information  7  6  34    1 
Late Delivery  5    10   
Non Delivery  1  3  136  4   
Policy Restriction  5  1  23   
Substandard Delivery  22  38  174  40  1 
Unacceptable 
Behaviour  3  19  77  22 
Grand Total  43  70  463  66  2 
 
Table 2 – Number of complaints by area 
 
Details of complaint themes within ward areas are provided below.  
Area 
Count of Ward 
Area 
Area Not Identified  5 
Mid Argyll Kintyre and the 
Islands  121 
Oban Lorn and the Isles  137 
Bute and Cowal  150 
Helensburgh and Lomond  231 
Grand Total  644 
 
 
 
 
 
 
 
 
 
 
 
Page 144

Page 145

Page 3  Annual Complaints Report 2021‐22  Appendix 2 
 
 
Section 3 – Complaints themes by Area 
 
Table 3a Mid Argyll, Kintyre and Islands 
 
Row Labels  Count of Ward Area 
Staff Issue ‐ Conduct  12 
Staff Issue ‐ Communication  9 
Domestic Refuse Collection  7 
Education ‐ Treatment of Child  7 
Quality of Care  6 
Planning Applications  6 
Staff Issue ‐ Other  5 
Street Lighting  5 
Failure of Care  4 
Public Transport  4 
Ground Maintenance  4 
Public Conveniences  4 
Social Work Decisions  4 
Education ‐ Other  4 
Missed Bin  4 
Commercial Refuse  3 
Recycling  3 
Piers & Harbours  3 
Cemeteries  3 
Council Tax Other  2 
Council Property/Buildings  2 
Council Decision  2 
Council Payments  2 
Road Works  1 
Civic Amenity  1 
School Transport  1 
Projects, Renewables & Regeneration  1 
Pothole  1 
Surfacing  1 
School Catering  1 
Homelessness Service  1 
Litter  1 
Building Warrants  1 
Local Development Plan  1 
Dog Fouling  1 
Pavements/Footpaths  1 
Council Service Error  1 
Public Health  1 
Parking Services  1 
Grand Total  121 
 
 
Page 145

Page 146

Page 4  Annual Complaints Report 2021‐22  Appendix 2 
 
 
 
3b Oban, Lorn and the Isles 
 
 
 
 
 
 
Row Labels 
Count of Ward 
Area 
Parking Services  15 
Staff Issue ‐ Conduct  12 
Domestic Refuse Collection  11 
Staff Issue ‐ Communication  8 
Council Tax Other  7 
School Transport  6 
Public Conveniences  5 
Education ‐ Other  5 
Council Service Error  4 
Commercial Refuse  4 
Pothole  4 
Street Lighting  4 
Council Decision  3 
Cemeteries  3 
Social Work Decisions  3 
Quality of Care  3 
Winter Maintenance  3 
Drainage  2 
Recycling  2 
Failure of Care  2 
Missed Bin  2 
Road Works  2 
Cost of Council Service  2 
Special Uplift  2 
Private Sector Grants  2 
Ground Maintenance  2 
Public Transport  2 
School Catering  1 
Enforcement  1 
Care Funding  1 
Fly Tipping  1 
Staff Issue ‐ Other  1 
Traffic Management  1 
Leisure Services  1 
Benefits Other  1 
Homelessness Service  1 
Road Closure  1 
Projects, Renewables & 
Regeneration  1 
Road Signage  1 
Dangerous Buildings  1 
Planning Applications  1 
Civic Amenity  1 
Benefit Payments  1 
Pest Control  1 
Grand Total  137 
Page 146

Page 147

Page 5  Annual Complaints Report 2021‐22  Appendix 2 
 
 
3c Bute and Cowal   
 
 
 
Benefits Other  1 
Civic Amenity  1 
Landlord Registration  1 
Building Warrants  1 
Benefits Payments  1 
Council Decision  1 
Council Property/Buildings  1 
Litter  1 
Live Argyll ‐ Other  1 
Grand Total  150 
Row Labels 
Count of Ward 
Area 
Staff Issue ‐ Communication  14 
Staff Issue ‐ Conduct  11 
Domestic Refuse Collection  11 
Council Tax Other  10 
Education ‐ Other  8 
Ground Maintenance  7 
Parking Services  6 
Social Work Decisions  5 
Failure of Care  5 
Education ‐ Treatment of Child  5 
Planning Applications  5 
Recycling  4 
Commercial Refuse  3 
Staff Issue ‐ Other  3 
Public Health  3 
Council Payments  3 
Traffic Management  3 
Play Parks  2 
Disabled Parking Bays  2 
Quality of Care  2 
Cemeteries  2 
Street Lighting  2 
Surfacing  2 
Projects, Renewables & 
Regeneration  2 
Committee/Governance  2 
Data Protection  2 
Noise Control  2 
Non Domestic Rates  2 
Drainage  2 
Missed Bin  1 
Road Works  1 
Dangerous Buildings  1 
Fleet  1 
Enforcement  1 
Flooding  1 
Cost of Council Service  1 
Pavements/Footpaths  1 
Road Markings  1 
Council Service Error  1 
School Transport  1 
 
 
Page 147

Page 148

Page 6  Annual Complaints Report 2021‐22  Appendix 2 
 
3d Helensburgh and Lomond 
 
 
 
 
Row Labels 
Count of Ward 
Area 
Domestic Refuse Collection  64 
Missed Bin  23 
Staff Issue ‐ Conduct  16 
Parking Services  14 
Staff Issue ‐ Communication  14 
Education ‐ Other  12 
Planning Applications  8 
Recycling  7 
Street Lighting  6 
Council Tax Other  5 
Failure of Care  5 
Education ‐ Treatment of 
Child  4 
Commercial Refuse  4 
Pothole  3 
Road Works  3 
Staff Issue ‐ Other  3 
Flooding  3 
Civic Amenity  3 
Traffic Management  2 
Litter  2 
Care Funding  2 
Council Property/Buildings  2 
Council Service Error  2 
Speed Limits  1 
Benefits Other  1 
Ground Maintenance  1 
Play Parks  1 
Scottish Welfare Fund  1 
Cemeteries  1 
Noise Control  1 
Winter Maintenance  1 
Surfacing  1 
Public Conveniences  1 
School Transport  1 
Public Health  1 
Social Work Decisions  1 
Quality of Care  1 
Council Payments  1 
Local Development Plan  1 
Non Domestic Rates  1 
Road Closure  1 
Street Sweeping  1 
Road Signage  1 
Pavements/Footpaths  1 
Data Protection  1 
School Crossings  1 
Private Sector Grants  1 
Grand Total  231 
Page 148

Page 149

Page 7  Annual Complaints Report 2021‐22  Appendix 2 
 
3e Top 10 complaint themes, broken down by ward area 
 
Count of Ward Area      
Row Labels 
Bute and 
Cowal 
Helensburgh 
and Lomond 
Mid Argyll 
Kintyre and the 
Islands 
Oban Lorn and 
the Isles  Grand Total 
Council Tax Other  10  5  2  7  24 
Domestic Refuse 
Collection  11  64  7  11  93 
Education ‐ Other  8  12  4  5  30 
Missed Bin  1  23  4  2  30 
Parking Services  6  14  1  15  36 
Planning 
Applications  5  8  6  1  21 
Recycling  4  7  3  2  16 
Staff Issue ‐ 
Communication  14  14  9  8  45 
Staff Issue ‐ Conduct  11  16  12  12  51 
Street Lighting  2  6  5  4  17 
Grand Total  72  169  53  67  363 
 
*2 entries for unidentified area removed 
 
Section 4 – Service breakdown by area and theme 
 
Table 4a – Chief Executives Unit, Financial Services, Community Planning and Development 
 
Count of Ward Area           
Row Labels 
Bute and 
Cowal 
Helensburgh 
and Lomond 
Mid Argyll Kintyre 
and the Islands 
Oban Lorn and the 
Isles  Grand Total 
Benefit Payments        1  1 
Benefits Other  1  1    1  3 
Benefits Payments  1       1 
Council Payments  3  1  1    5 
Council Service Error    1     2 
Council Tax Other  10  5  2  7  24 
Non Domestic Rates  2  1     3 
Private Sector Grants        1  1 
Scottish Welfare Fund    1     1 
Staff Issue ‐ Communication  2       2 
Grand Total  19  10  3  10  43 
 
 
 
 
 
 
 
 
 
 
 
Page 149

Page 150

Page 8  Annual Complaints Report 2021‐22  Appendix 2 
 
 
Table 4b – Education, Legal and Regulatory Support, Commercial Services 
 
Count of Ward Area      
Row Labels 
Bute and 
Cowal 
Helensburgh 
and Lomond 
Mid Argyll 
Kintyre and the 
Islands 
Oban Lorn 
and the Isles  Grand Total 
Committee/Governance  2     2 
Council Decision  1    1  1  3 
Council 
Property/Buildings  1  2  1    4 
Data Protection  1  1    2 
Education ‐ Other  8  12  4  5  30 
Education ‐ Treatment of 
Child  5  4  7    16 
Road Works  1    1 
School Catering   1  1  2 
Staff Issue ‐ 
Communication  1  4  1    6 
Staff Issue ‐ Conduct  1  1    1  3 
Staff Issue ‐ Other   1    1 
Grand Total  20  25  16  8  70 
 
 
Table 4c – Roads and Infrastructure Services 
 
Row Labels 
Bute and 
Cowal 
Helensburgh 
and Lomond 
Mid Argyll 
Kintyre and 
the Islands 
Oban Lorn 
and the Isles  Grand Total 
Cemeteries  2  1  3  3  9 
Civic Amenity  1  3  1  1  6 
Commercial Refuse  3  4  3  4  14 
Cost of Council Service  1    2  3 
Council Decision   1  2  3 
Council Property/Buildings   1    1 
Council Service Error  1  1    2  5 
Dangerous Buildings    1  1 
Disabled Parking Bays  2     2 
Dog Fouling   1    1 
Domestic Refuse Collection  11  64  7  11  93 
Drainage  2    2  4 
Fleet  1     1 
Flooding  1  3    4 
Fly Tipping    1  1 
Ground Maintenance  7  1  4  2  14 
Litter  1  2  1    4 
Missed Bin  1  23  4  2  30 
Noise Control  1    1 
Parking Services  6  14  1  15  36 
Pavements/Footpaths  1  1  1    3 
Page 150

Page 151

Page 9  Annual Complaints Report 2021‐22  Appendix 2 
 
Pest Control    1  1 
Piers & Harbours   3    3 
Play Parks  2  1    3 
Pothole  3  1  4  8 
Projects, Renewables & 
Regeneration   1  1  2 
Public Conveniences  1  4  5  10 
Public Transport   4  2  6 
Recycling  4  7  3  2  16 
Road Closure    1  1 
Road Markings  1     1 
Road Signage  1    1  2 
Road Works  1  2  1  2  6 
School Crossings  1    1 
School Transport  1  1  1  6  9 
Special Uplift    2  2 
Speed Limits  1    1 
Staff Issue ‐ Communication  6  4  3  4  17 
Staff Issue ‐ Conduct  5  12  8  5  30 
Staff Issue ‐ Other  1  3  1    5 
Street Lighting  2  6  5  4  17 
Street Sweeping  1    1 
Surfacing  2  1  1    4 
Traffic Management  3  2  1  6 
Winter Maintenance  1  3  4 
Grand Total  69  166  64  92  392 
 
 
Table 4d – Development and Economic Growth 
Row Labels 
Bute and 
Cowal 
Helensburgh 
and Lomond 
Mid Argyll 
Kintyre and 
the Islands 
Oban Lorn 
and the Isles  Grand Total 
Building Warrants  1    1    2 
Dangerous Buildings  1     1 
Enforcement  1    1  2 
Homelessness Service   1  1  2 
Landlord Registration  1     1 
Local Development Plan  1  1    2 
Noise Control  2     2 
Planning Applications  5  8  6  1  21 
Private Sector Grants  1    1  2 
Projects, Renewables & 
Regeneration  2     2 
Public Health  3  1  1    5 
Road Closure  1    1 
Staff Issue ‐ Communication  4  5  3  4  16 
Staff Issue ‐ Conduct  2  1  2  1  6 
Grand Total  22  18  15  9  65 
 
Page 151

Page 152

Page 10  Annual Complaints Report 2021‐22  Appendix 2 
 
Health and Social Care Partnership 
Table 5a – Area breakdown 
Row Labels 
Bute and 
Cowal 
Helensburgh 
and Lomond 
Mid Argyll 
Kintyre and 
the Islands 
Oban Lorn 
and the Isles 
Grand 
Total 
Children and Families  8  6  7  6  27 
Mental Health, Learning Disability , 
Addictions and Lifelong Conditions  3  1  4    8 
Older Adults/Community Hospitals  7  5  11  8  31 
Grand Total  18  12  22  14  66 
 
Table 5b – Area & Theme breakdown 
Row Labels 
Bute and 
Cowal 
Helensburgh 
and Lomond 
Mid Argyll 
Kintyre and the 
Islands 
Oban Lorn 
and the Isles  Grand Total 
Children and Families  8  6  7  6  27 
Care Funding    1    1 
Council Payments    1    1 
Data Protection  1     1 
Failure of Care  2     2 
Quality of Care  1  1  2    4 
Social Work Decisions  3  1  3  3  10 
Staff Issue ‐ Communication  1  1 
Staff Issue ‐ Conduct  1  2  1  2  6 
Staff Issue ‐ Other     1  1 
Mental Health, Learning 
Disability , Addictions and 
Lifelong Conditions  3  1  4    8 
Failure of Care  1  1  1    3 
Social Work Decisions    1    1 
Staff Issue ‐ Communication    2    2 
Staff Issue ‐ Conduct  1     1 
Staff Issue ‐ Other  1     1 
Older Adults/Community 
Hospitals  7  5  11  8  31 
Care Funding    1    1  2 
Failure of Care  2  4  3  2  11 
Quality of Care  1    4  3  8 
Social Work Decisions  2     2 
Staff Issue ‐ Conduct  1    1  2  4 
Staff Issue ‐ Other  1    3    4 
Grand Total  18  12  22  14  66 
 
Notes 
1. The total number of complaints does not exactly relate to the total number of themes reported, as many of 
the complaints escalated from stage 1 to stage 2 represent 1 theme. 
 
Page 152

Page 153

ARGYLL AND BUTE COUNCIL  Audit and Scrutiny Committee                                                             
Legal and Regulatory Support  15th September 2022 
Freedom of Information – Annual Report 2021-22 
1.0 INTRODUCTION 
1.1 This report is to update the Audit & Scrutiny Committee on the position
regarding the recording, responding to, monitoring and reporting of
requests for information under the Freedom of Information (Scotland) Act
2002 (FOISA) and the Environmental Information (Scotland) Regulations
2004 (EIR’s) for the period between 01 April 2021 and 31 March 2022. 
2.0 RECOMMENDATIONS 
2.1 The Audit & Scrutiny Committee consider and note the terms of this
report. 
3.0 DETAIL 
3.1 A total of 1,233 requests for information were received during the period -
1 April 2021 to 31 March 2022. Overall, 93% of these requests (1,150)
were responded to within the statutory timescale of 20 working days and
83 requests were responded to after 20 working days. These totals
include requests for information from the Health and Social Care
Partnership (Social Work side) and Live Argyll. 
3.2 A breakdown by Department and detail around late responses is
provided in Appendix 1. 
3.3 There were 33 requests for review made during this period, which
equates to less than 3% of the total number of requests. 28 were
responded to within the 20 working day statutory timescale (85%), and
the 5 issued late required more time to gather information and investigate
complex issues. 
3.4 The overall response rate within timescale has decreased slightly from
94% in 2020/21 to 93% in 2021/22. As the details provided in appendix 1
show, many service areas achieved a very high level of performance,
between 98-100%.   
3.5 One case was investigated by OSIC in 2021/22, and after some
additional information was provided to the requestor, the application was
withdrawn.    
Page 153 Agenda Item 13

Page 154

3.6 The Compliance and Regulatory team continues to work with
Departments to seek to improve response rates where required, and
deliver training and provide guidance to allow officers to appropriately
respond to information requests. 
3.7 The Compliance and Regulatory team provide monthly updates to the
Chief Executive, the Chief Officer, Directors, Heads of Service and the
departmental FOI reps. Quarterly reports are provided to all DMTs. 
4.0 CONCLUSION 
4.1 Many Services maintained an excellent performance level throughout
2021/22, and the overall result of 93% of responses issued within
timescale is positive, given the pressures on some service areas where
high numbers of information requests were received. 
4.2 The Compliance and Regulatory team continues to work with
Departments to seek to improve response rates where required, and
deliver training and provide guidance to allow officers to appropriately
respond to information requests. 
5.0 IMPLICATIONS 
5.1 Policy None
5.2 Financial  None
5.3 Legal   Possible breach of statutory requirement to respond to
requests
5.4 HR None
5.5.1 Fairer Scotland
Duty
None
5.5.2 Equalities –
Protected
Characteristics
None
5.5.3 Socio Economic
Duty
None
5.5.4 Islands None
5.6 Risk  None
5.7 Customer
Service
The relatively low number of requests for review is indicative
that we are responding appropriately to requests and
customers are receiving the information they are looking for. 
Douglas Hendry
Executive Director with responsibility for Legal and Regulatory Support 
22nd August 2022                                                  
For further information contact: Iain Jackson, Governance, Risk and Safety
Manager 01546 604188 
APPENDICES
Appendix 1 – Departmental/Service stats & Late Response Details 
Page 154

Page 155

Department / Service Total
requests
received
Responded
to in time
Responded
to late
Running
in time
Running
late
Likely
overall %
Chief Executives
Financial 78 76 2 0 0 97%
CP&D 1 1 0 0 0 100%
Customer Services
Education 138 128 10 0 0 93%
L&RS 354 346 8 0 0 98%
Commercial 37 37 0 0 0 100%
Development and Infrastructure
D&EG 205 174 31 0 0 85%
R&IS 194 167 27 0 0 86%
Customer 100 97 3 0 0 97%
Health and Social Care Partnership
IJB 0 0 0 0 0 -
Adult Care 70 69 1 0 0 99%
C&F / CJ 45 44 1 0 0 98%
Live Argyll
Live Argyll 11 11 0 0 0 100%
Totals 1233 1150 83 0 0 93%
FOISA and EIR Requests
Information Requests - Annual Figures - 1st April 2021 - 31st March 2022 
Page 155

Page 156

Request
No
Date
Received Date Due Date Closed Duration Subject Late Closure Details
13166 20/08/2021 17/09/2021 21/09/2021 22 Payment Data
Late response from information
provider
There was confusion over response within
service. FOI team provided clarity on
exemption and response was issued
13786 04/02/2022 04/03/2022 11/03/2022 25 Card processing supplier
Late response from information
provider
Information provider identified on due date
that response required input from another
service. This was unable to be provided same
day. Partial response sent on due date
13552 01/12/2021 31/12/2021 10/01/2022 19 Meals in schools
Late response from information
provider
Late response due to school holidays had not
received responses from 5 schools.
12899 07/06/2021 05/07/2021 06/07/2021 21 Additional Teachers Recruited No reason for delay provided Response issued one day after due date
13687 17/01/2022 14/02/2022 15/02/2022 21 Primary school swimming lessons
Late response from information
provider
Unable to respond on due date as still waiting
for one school to respond.  Partial response
sent 1 day late.
12956 21/06/2021 19/07/2021 21/07/2021 22
2021 grade boundaries for Higher
courses Service sign-off delay
Schools on holiday and with both the phased
return and C19 restrictions staff have had
competing priorities.
13947 17/03/2022 14/04/2022 26/04/2022 26 'Campus Cops'
Late response from information
provider
Emailed requestor 31.03.22 to advise of school
holiday and that response will be late. 
Requestor happy with this.

Partial response sent 26.04.22 (some
information not recorded by schools).
13005 06/07/2021 03/08/2021 16/08/2021 29
Child Protection/Safeguarding issues
raises and disposal of them
Original request not logged as
FOI Error in processing within Central FOI team
13712 11/01/2022 08/02/2022 23/02/2022 31 Homeschooling and Flexi-schooling
Late response from information
provider
Late response as not all schools responded
prior to closure for school holidays
12910 28/04/2021 27/05/2021 16/06/2021 34
Local Authority Education Budgets 2021-
2022
Original request not logged as
FOI until due date
Original request sent to Acting Head of
Education but not moved on as an FOI. 
Reminder received from EIS 07.06.21.

Response sent in full 16.06.21.
Financial Services
Education
Page 156

Page 157

12988 01/07/2021 29/07/2021 25/08/2021 39 SQA for higher exams this year (2021).
Late response from information
provider Delay due to summer break
12979 28/06/2021 26/07/2021 27/08/2021 44 Provisional Higher grades 2021
Late response from information
provider
Response sent in full 24 days late (due to
school hols / availability of attainment data)
13003 06/07/2021 03/08/2021 04/08/2021 21
Number of playgrounds, MUGAs and
outdoor fitness areas
Late response from information
provider
Late response from Roads and Amenity
Services
13456 09/11/2021 07/12/2021 08/12/2021 21 Housing grants for disability adaptations
Late response from information
provider
Housing admin were unable to supply the
information within the timescale, poor internet
connection / ICT problem
13336 25/11/2021 22/11/2021 16/12/2021 38 Covid-19 pandemic C19
Late response from information
provider
Late responses from EDST & Finance - Resource
intensive request
12783 12/05/2021 09/06/2021 07/08/2021 40 PAT testing
Late response from information
provider Request not taken forward during staff absence
13272 21/09/2021 11/11/2021 13/12/2021 42 The Wildlife Centre
Late response from information
provider
Delay due to volume of information and
clarification around request sought -
clarification received changed the nature of the
request to SAR, FOI response issued 13/12 and
SAR request logged
13058 21/07/2021 18/08/2021 22/09/2021 45 Housing developments Service sign-off delay Late response from Legal Services
13599 14/12/2021 17/01/2022 19/01/2022 22 PFI / PPP / NPD contract
Late response from information
provider Late due to pressure of other workload
13634 21/12/2021 24/01/2022 27/01/2022 23 CCTV maintenance and support contract
Late response due to staff
absence Late response due to admin error
12762 05/05/2021 02/06/2021 03/06/2021 21
Certificates Knotweed at 7 Kilbride Road,
Dunoon
Late response from information
provider
Late response due to absences within
Development Management team.
12773 10/05/2021 07/06/2021 08/06/2021 21 Hebridean Air Services Service issue
Late response due to resource issues within DIS
Performance HQ.
12805 17/05/2021 14/06/2021 15/06/2021 21 Housing Notice ABC/CO/0157 Service sign-off delay
13234 07/09/2021 06/10/2021 07/10/2021 21 Planning Application 21/00640/PP 
Legal and Regulatory Support
Procurement
Development and Economic Growth
Page 157

Page 158

13792 07/02/2022 07/03/2022 08/03/2022 21 Short-Term Rental Enforcement
Received within 5 working days
of due date
Request was passed to Housing, response
required to be provided by Environmental
Health but was not passed to them until
03/03/22
12781 12/05/2021 09/06/2021 11/06/2021 22
Tree Preservation Order for 7 Kilbride
Road, Dunoon & Sewage Treatment
Works at Storie's Yard, Kilbride Road,
Dunoon
Access required to print and post
response
Response issued 2 days late as requestor
required a hard copy, electronic copy provided
in time.
12859 26/05/2021 23/06/2021 25/06/2021 22 Farm welfare offences
Late response from information
provider Response issued to wrong recipient
13118 11/08/2021 08/09/2021 10/09/2021 22 Machrinhanish Dunes EIR
13410 22/10/2021 19/11/2021 23/11/2021 22
Land formerly known as Rhu Bowling
Club
Late response from information
provider
Late due to resource issues within
Environmental Health
13957 21/03/2022 20/04/2022 22/04/2022 22 Fires & nuisance smoke reports
Late response due to staff
absence
Key staff on annual leave and competing
workload pressures
12724 23/04/2021 24/05/2021 27/05/2021 23 Vessels using Port Askaig pier
Late response from information
provider Resource issues within Marine Services team.
13109 09/08/2021 07/09/2021 10/09/2021 23 Rat complaints
Late response from information
provider
Late due to delay in response from
Environmental Health
13463 09/11/2021 07/12/2021 10/12/2021 23 Landlord Registration Service sign-off delay Late response due to admin error
13462 09/11/2021 07/12/2021 10/12/2021 23 Idling
Late response from information
provider
Final response from Environmental Health
received late
12964 22/06/2021 20/07/2021 26/07/2021 24 Animal Welfare (Scotland) Act 2006
Late response due to staff
absence 
13698 20/01/2022 17/02/2022 24/02/2022 25 Main Issues Report
Late response from information
provider
Late response due to competing work
demands.
13903 04/03/2022 01/04/2022 08/04/2022 25 Private water supplies
Late response due to staff
absence
Key staff on annual leave and competing
workload pressures
12693 16/04/2021 17/05/2021 25/05/2021 26 50821 Helensburgh Golf Club
Late response from information
provider
Late response due to absence of key staff
member.
12996 02/07/2021 30/07/2021 09/08/2021 26 P4020 Culcharron Quarry
Late response from information
provider
Partial Response issued 30/07/21 - Full
response not issued on time due to staff
absence within Dev Policy and a requirement
for staff to access office to scan hard copy
documents
13304 29/09/2021 27/10/2021 05/11/2021 27 Animal Activities Licensing
Late response due to staff
absence 
Page 158

Page 159

13364 13/10/2021 10/11/2021 19/11/2021 27 Noise complaints
Late response due to staff
absence
Late response due to key staff absence and
workload pressures
12766 10/05/2021 07/06/2021 17/06/2021 28
Air Service Public Service Obligation
information
Late response from information
provider Information provided late by Service
13502 22/11/2021 20/12/2021 06/01/2022 29 Wind Farm Planning Applications
Late response from information
provider
Admin Error - EIR had been marked as
complete when no response had been issued
12699 19/04/2021 18/05/2021 01/06/2021 30
Planning Application Reference
86/00001/MIN
Late response from information
provider
Late response due to absences within
Development Management team.
12700 19/04/2021 18/05/2021 01/06/2021 30
Planning Application Reference
89/01256/MIN001
Late response from information
provider
Late response due to absences within
Development Management team.
12701 19/04/2021 18/05/2021 01/06/2021 30
Planning Application Reference
15/02114/MIN
Late response from information
provider
Late response due to absences within
Development Management team.
12702 19/04/2021 18/05/2021 01/06/2021 30
Planning Application Reference
18/02399/MIN
Late response from information
provider
Late response due to absences within
Development Management team.
13814 09/02/2022 09/03/2022 25/03/2022 32 Information on the Landlord Register Service sign-off delay
Partial response sent 10/03/22

Response to Q5 sent 25/03/2022 service sign
off delay as information not readily available
13853 21/02/2022 21/03/2022 08/04/2022 34 Copy of HMO Register Service sign-off delay
Information on website was outdated which
caused need for request. Required to be
updated through liaison with HMO owners
before response could be issued
12725 23/04/2021 04/06/2021 14/07/2021 48 Local Development Plans
Late response from information
provider
Remainder of information requested to be
provided by end of June.
12927 14/06/2021 12/07/2021 25/08/2021 52 Affordable Housing provision
Late response from information
provider
12774 10/05/2021 07/06/2021 08/06/2021 21 Pot holes
Late response from information
provider Information provided late by Service
13039 14/07/2021 11/08/2021 12/08/2021 21 Harbour Revision Order
Late response from information
provider
Late response due to resource issues within
Marine Operations team.
13243 10/09/2021 11/10/2021 12/10/2021 21 BPM/SHEPHERD/Y19R0020
Late response from information
provider
Late response due to absence within HUB
team.
13311 27/09/2021 26/10/2021 27/10/2021 21 Waste Services Department Service sign-off delay Late response due to admin error.
13301 29/09/2021 27/10/2021 28/10/2021 21 Herbicide Use
Late response from information
provider
Late response due to resource issues within
Amenity Services team.
Roads & Infrastructure
Page 159

Page 160

13303 29/09/2021 27/10/2021 28/10/2021 21 Herbicide Use
Late response from information
provider
Late response due to resource issues within
Amenity Services team.
13644 05/01/2022 02/02/2022 03/02/2022 21 Potholes and road repair
Late response from information
provider
Response with all information held by RIS was
sent on the due date. Unable to get the
information held by Legal Services within
timescale, remainder of info sent by Legal on
03/02/22.
12846 24/05/2021 21/06/2021 23/06/2021 22 Burials and Cremations
Late response from information
provider
Resource issues within RIS Communications
team
12850 24/05/2021 21/06/2021 23/06/2021 22
Gourock, Dunoon, Kilcreggan
Infrastructure and Vessels Project
(GDKIVP) Service sign-off delay
Reason for late response - resource issues
within RIS Communications team, also was
waiting for advice from FOI team.
12868 28/05/2021 25/06/2021 29/06/2021 22 Isle of Bute Outer Harbor Pontoons Service sign-off delay
12999 05/07/2021 02/08/2021 04/08/2021 22 Streetlights/streetlamps
Late response from information
provider
Late response due to resource issues within
Street lighting team.
13747 01/02/2022 01/03/2022 03/03/2022 22 Complaints about potholes
Late response from information
provider
Response required greater than anticipated
manual input from WDM team.
12973 24/06/2021 22/07/2021 27/07/2021 23 Children’s playgrounds
Late response from information
provider
Late response from 1 area, coupled with annual
leave within HUB team.
13478 12/11/2021 10/12/2021 15/12/2021 23 Car Brand
Late response from information
provider Late response absence of a key staff member
13754 21/01/2022 18/02/2022 23/02/2022 23 Road faults Achaleven Road
Late response from information
provider Late response due to admin error.
13833 15/02/2022 15/03/2022 18/03/2022 23 Query relating to traffic lights
Late response from information
provider Late response due to admin error.
12994 01/07/2021 29/07/2021 04/08/2021 24 Truck restrictions data
Late response from information
provider
Late response due to resource issues within
HUB team.
12764 06/05/2021 03/06/2021 10/06/2021 25 B8045 Inspections & Defects
Late response from information
provider
Late response due to mistake by DIS
Performance HQ team.
13963 22/03/2022 21/04/2022 28/04/2022 25 Car Park Usage Data in Oban
Late response from information
provider
Resource issues within team due to complexity
of request
13823 14/02/2022 14/03/2022 22/03/2022 26 Streetlights Service sign-off delay
Response late as there were issues with
accuracy of the information provided by our
streetlighting team which required further
investigation.
Page 160

Page 161

12904 07/06/2021 05/07/2021 15/07/2021 28 ROAD FAULTS ACHALEVEN ROAD
Late response from information
provider
Late response due resource issues within RIS
team.
13394 25/10/2021 22/11/2021 02/12/2021 28
Replacing/repairing the balustrade on the
bridge over the A817 (haul rd) just before
its junction with the A82 Service sign-off delay
Late response due to concerns over commercial
sensitivity of information.
12790 13/05/2021 10/06/2021 24/06/2021 30
Adoption  Standard     for   a road    in
Argyll  & Bute
Late response from information
provider
Late response due to resource issues within
Traffic & Development team. Info was not
readily available and required manual collation
from a number of sources.
12722 23/04/2021 24/05/2021 08/06/2021 31 Argyll & Bute Council car park
Late response from information
provider
Late response due to resource issues within
Traffic & Development team.
13129 13/08/2021 10/09/2021 01/10/2021 34 External litter bins
Late response from information
provider
Late response due to difficulty in providing the
information requested, which was not readily
available.
13294 28/09/2021 26/10/2021 15/11/2021 34
Fixed Penalty Notices (FPNs) for parking
and environmental offences. Service sign-off delay
13571 03/12/2021 06/01/2022 26/01/2022 34
Monies allocated to road markings for
this year and where that money was
spent
Late response from information
provider
Late response due to resource issues within
services. Customer was kept updated and some
information provided where possible in
advance of final response.
13880 27/01/2022 24/02/2022 04/03/2022 26
Post Number A4726 - Team Leader
Programming & Planning
Original request not logged as
FOI
Response issued 1 date late as there was
confusion within service about who would be
issuing response.
12710 21/04/2021 20/05/2021 31/05/2021 27 Software asset management System Issues
Problems with Email stopped reminder emails
being issued to FOI Rep
13736 27/01/2022 24/02/2022 10/03/2022 30 Hosting
Late response from information
provider
FOI was missed by information provider and
takes a lot of time to gather. Currently looking
at ways to publish to reduce time in future
Health and Social Care Partnership
ICT
HR & OD
Page 161

Page 162

13208 02/09/2021 01/10/2021 04/10/2021 21 Care
Late response from information
provider Late due to resource issues within SW Finance
13460 09/11/2021 07/12/2021 09/12/2021 22 Local offer for care leavers
Late response from information
provider
Full response. Late response from information
provider.
Page 162

Page 163

ARGYLL AND BUTE COUNCIL  AUDIT AND SCRUTINY COMMITTEE 
FINANCIAL SERVICES  15 SEPTEMBER 2022 
SCRUTINY – IDENITIFICATION AND ASSESSMENT OF TOPICS 2022-23 
1. INTRODUCTION  
1.1 The objective of the report is to provide the Audit and Scrutiny Committee
(the Committee) with a summary of potential areas/topics identified by
Members over the summer and consider these in the context of the Scrutiny
Manual and Framework in order to take forward as part of the Committee’s
scrutiny role for 2022-23.  
2. RECOMMENDATIONS  
2.1 The Audit and Scrutiny Committee is asked to:  
2.1.2 Consider the suggested topics identified in accordance with the agreed
process of assessment which is detailed in the Scrutiny Framework and
Manual.  
2.1.3 Approve the one topic(s)/area(s) identified which would provide maximum
benefit across the authority by adding value and supporting continuous
improvement, specifically, Public Consultations. Consider as the financial year
progresses whether another area be identified for scrutiny. In addition, obtain
a further update in 2023/24 in relation to Waste Management to ascertain how
discussions and planned responses to risk have been taken forward by the
Council as discussions progress at a national level.    
2.1.4 Note that the (CIA) will assist in finalising a ‘scope’ for the one topics/areas
with the Members leading the review once further discussion with relevant
Senior Managers takes place in order that resources are being focused
efficiently and effectively. 
3 DETAIL  
3.1 The development of the scrutiny function has progressed successfully and in
2022/23 two scrutiny reviews were undertaken and reported, specifically ‘fly
tipping’ and ‘community asset transfer’.  Scrutiny reviews are beneficial where
there is a clear and identifiable need to consider areas where the primary
focus is either continuous improvement or where concerns have been
identified and the review would be in the context of ongoing improvement.  It
is also important to note that any recent, ongoing or planned reviews by other
areas of the Council, for example Internal Audit, together with any ongoing
processes, for example, which may include legal action would require to be
concluded in the first instance.  This similarly applies where any external
bodies may be involved dependant on the circumstances.  This is to prevent
resources being inefficiently utilised, formal processes that may be ongoing
being compromised and statutory roles/duties to be fulfilled in the first
instance. 
Page 163 Agenda Item 14

Page 164

3.2 There are no minimum or maximum number of scrutiny reviews that require to
be undertaken but such reviews should flow from identifiable ‘issues’ and
where there is a remit taking cognisance of the limitations outlined in
paragraph 3.1 of the report.  During the initial stages of identifying potential
areas where scrutiny resources could be focused on, two areas were
suggested by Committee members, specifically ‘public consultations’ and
‘waste management’.    
3.3 In relation to waste management and also to provide newer members of the
Committee context, a presentation was made to the previous Audit and
Scrutiny Committee in April 2021 by the Head of Roads and Infrastructure and
it was felt, at that time, appropriate progress was being made in relation to the
Council’s waste strategy and that the inclusion of a specific scrutiny topic
focusing on the strategy would not add value at that time.  Notwithstanding,
the Committee, given the materiality of the potential future impact of the
issues relating to waste on the Council’s future revenue position agreed to
keep abreast of progress.  Furthermore, at the last meeting of the Audit and
Scrutiny Committee in June 2022 an update was requested by the
Committee.  It is important to note that the effects of the bio-degradable waste
being diverted from landfill affects all local authorities in Scotland and
discussions continue at a national level which could affect the approach taken
by a number of Council’s, particularly those who may be disproportionately
affected.  It is critical that these discussions continue to take place and until a
more defined picture is obtained in relation to any derogation, if provided,
could change the approach taken to this specific issue.  This matter may well
be further considered as a potential scrutiny item in 2023/24 once additional
and clearer information becomes available to the Council. 
3.4 The second item of potential scrutiny identified was  ‘public consultations’
which is both an important but in some cases a statutory requirement in terms
of any significant planned change in approach by a local authority. In terms of
a potential scrutiny review, this can be justified both in terms of added value
and potential for identifying any, if applicable, areas for continuous
improvement and links with ‘good community engagement’. It would be
important to have a very clear and focused scope given the potential risk of
becoming unwieldly.  A process of looking at the existing arrangements within
the Council in terms of the approach to public consultations in a generic
manner would likely be the most beneficial method and any areas of
improvement, if identified, could be applied in a constructive way across the
Council.  Furthermore, the Scrutiny Framework adopted by the Council states
“In particular, when assessing potential topics for scrutiny, the Committee
should ensure the topic is not already being considered by an existing
committee (area or strategic).  The Audit and Scrutiny Committee should not
generally be seen as the first committee to contact in relation to a topic
meriting potential review nor should it be seen as a committee to deal with
complaints”.  It is therefore important that the scrutiny review focuses on
generic improvements rather than any existing or ongoing matters which are
the remit of other Committee(s) of the Council.   
Approach to Scrutiny agreed by the Committee in June 2021 – Context
and Background 
3.5 In order to provide newer Members of the Committee more context to the
development of ‘scrutiny reviews’; in April 2021 a  Development Session was
Page 164

Page 165

held to establish the process to be adopted by the Committee to identify and
prioritise potential scrutiny topics and of the overall approach adopted to
scrutiny topics which has been a combination of panel reviews and ‘scrutiny
lite’ where relevant officers have been asked to present at Committee or at
Development Sessions on topics of interest to the Committee. 
3.6 In particular the CIA asked the Committee to consider some key questions.
These, and the Committee responses, are summarised in the table below.  
3.7 Question Committee Response
Should Scrutiny topics
originate from all members
and senior officers or from
Committee members?
There needs to be a degree of flexibility to
change topics and to be able to react quickly
to an ever changing environment. 
It is for the Committee to determine scrutiny
topics. 
If topics originate from the
committee should this be
via discussions at
Committee or development
sessions? 
We may need to meet as a Committee more
often however these could be less formal
meetings and held virtually. Further thought
can be given to this as to some extent it will
depend on the number of emerging topics to
be considered for scrutiny. 
Do we still need an annual
scrutiny plan or should
topics for scrutiny ‘emerge’
as the year goes by?
We don’t need a plan we should allow items
to emerge. 
Do we still need the detailed
prioritisation process? 
The prioritisation process is there as a tool if
we need it but we don’t need to use to
assess every scrutiny topic. 
Do we have the right
balance between ‘full blown’
panel approach vs Scrutiny
Lite? 
There has been value in having the full
panels but these are resource intensive and
we should look to make use of a scrutiny lite
approach where appropriate.  Once a topic
is decided then the Committee can decide
what the best Scrutiny approach to adopt is. 
3.8 As a result of this feedback the CIA updated the Scrutiny Framework and
Manual to reflect the Committee responses detailed in the table above.  
4. CONCLUSION  
4.1 The scrutiny process continues to evolve as each review is progressed. 
Members and officers continue to identify areas for improvement and these
will be addressed as they are raised.  It is planned that up to two scrutiny
topics will be taken forward for inclusion in the scrutiny work plan for 2022-23. 
5 IMPLICATIONS  
5.1 Policy - None
5.2 Financial -None
Page 165

Page 166

5.3 Legal -None
5.4 HR - None
5.5 Fairer Scotland Duty - None
5.5.1 Equalities – None
5.5.2 Socio-Economic Duty – None
5.5.3 Islands Duty - None
5.6 Risk – None
5.7 Customer Service - None 
Paul Macaskill 
Chief Internal Auditor
15 September 2022                                                  
For further information contact: 
Paul Macaskill, Chief Internal Auditor (01546 604108) 
Page 166

Page 167

Audit & Scrutiny Committee Work Plan 2022 – 2023 
This is an outline plan to facilitate forward planning of reports to the Audit & Scrutiny Committee 
Report  Lead Service Regularity
15 September 2022 Reports to Committee Services by 22 August 2022
Internal Audit and Counter Fraud Summary of Activities Chief Internal Auditor Quarterly
Internal Audit Report Follow Up Chief Internal Auditor Quarterly
Internal Audit Reports to Audit and Scrutiny Committee 
 Education Management Allowance 
 Workforce Planning (HSCP Audit 2021/22) 
Chief Internal Auditor Quarterly
External Audit Update Report Audit Scotland Quarterly
Verbal Update by Chair(s) of Scrutiny Panel Chair and Vice Chair of Audit & Scrutiny
Committee  
Quarterly
Corporate Complaints Annual Report 2021/22  Governance, Risk and Safety Manager Annual
Freedom of Information Annual Report 2021/22  Governance, Risk and Safety Manager Annual
Audit & Scrutiny Committee 2021/22 Annual Report  Audit & Scrutiny Committee Chair Annual
Strategic Risk Register – Assurance Mapping Chief Internal Auditor Annual
Strategic Risk Register Update  Chief Executive Annual
Counter Fraud Annual Update (End of 2 year pilot) Chief Internal Auditor Annual
Waste Management Briefing Paper Head of Roads and Infrastructure Services One-off
20 December 2022 Reports to Committee Services by 25 November 2022
Internal Audit and Counter Fraud Summary of Activities Chief Internal Auditor Quarterly
Internal Audit Report Follow Up Chief Internal Auditor Quarterly
Internal Audit Reports to Audit and Scrutiny Committee 
 Early Years
Chief Internal Auditor Quarterly
Page 167
Agenda Item
15

Page 168

Audit & Scrutiny Committee Work Plan 2022 – 2023 
 Heritage Assets 
External Audit Update Report Audit Scotland Quarterly
Verbal Update by Chair(s) of Scrutiny Panel Chair and Vice Chair of Audit & Scrutiny
Committee  
Quarterly
Council 6-month Performance Report – April to September 2022 Chief Executive/Head of Customer Support
Services
Bi-Annual
16 March 2023 Reports to Committee Services by 20 February 2022
Internal Audit and Counter Fraud Summary of Activities Chief Internal Auditor Quarterly
Internal Audit Report Follow Up Chief Internal Auditor Quarterly
Internal Audit Reports to Audit and Scrutiny Committee 2023/24 Chief Internal Auditor Quarterly
Verbal Update by Chair(s) of Scrutiny Panel Chair and Vice Chair of Audit & Scrutiny
Committee  
Quarterly
RIPSA Annual Report Governance and Risk Manager Annual
Internal Audit 2023/24 Plan Chief Internal Auditor Annual
External Audit – 2022/23 Annual Plan Audit Scotland Annual
2021/22 Unaudited Annual Accounts Preparation Plan and Timetable Head of Financial Services Annual
Treasury Management Strategy and Annual Investment Strategy Head of Financial Services Annual
Progress against Best Value Action Plan Update Chief Executive/Head of Customer Support
Services
Annual
Internal Audit Charter and Internal Audit Manual Chief Internal Auditor Annual
Scrutiny Manual and Framework Update Chief Internal Auditor Annual
15 June 2023 Reports to Committee Services by 22 May 2023
Internal Audit and Counter Fraud Summary of Activities Chief Internal Auditor Quarterly
Internal Audit Report Follow Up Chief Internal Auditor Quarterly
Internal Audit Reports to Audit and Scrutiny Committee 
 
Chief Internal Auditor Quarterly 
External Audit Update Report Audit Scotland Quarterly
Page 168

Page 169

Audit & Scrutiny Committee Work Plan 2022 – 2023 
Verbal Update by Chair(s) of Scrutiny Panel Chair and Vice Chair of Audit & Scrutiny
Committee  
Quarterly
Council Performance Report – October 2022 to March 2023  Head of Customer Support Services Bi-Annual
Audit Scotland Report – Financial Overview 2021/22 (Usually comes
in March – delayed in 2022)
Head of Financial Services Annual
Strategic Risk Register Update Chief Executive Annual
Internal Audit 2022/23 Annual Report  Chief Internal Auditor Annual
Review of Code of Corporate Governance Governance, Risk and Safety Manager Annual
External Audit 2022/23 Management Report Audit Scotland Annual
Local Government Benchmarking Framework Report Head of Customer Support Services Annual
Unaudited Financial Accounts Head of Financial Services Annual
Local Government in Scotland:  Challenges and Performance 2023 Audit Scotland Annual
XX September 2023 Reports to Committee Services by XX August 2023
Internal Audit and Counter Fraud Summary of Activities Chief Internal Auditor Quarterly
Internal Audit Report Follow Up Chief Internal Auditor Quarterly
Internal Audit Reports to Audit and Scrutiny Committee  Chief Internal Auditor Quarterly
External Audit Update Report Audit Scotland Quarterly
Verbal Update by Chair(s) of Scrutiny Panel Chair and Vice Chair of Audit & Scrutiny
Committee  
Quarterly
PSIAS Self-Assessment  Chief Internal Auditor Annual
Local Government Benchmarking Framework Report Head of Customer Support Services Annual
Corporate Complaints Annual Report 2021/22  Governance, Risk and Safety Manager Annual
Freedom of Information Annual Report 2021/22  Governance, Risk and Safety Manager Annual
Audit & Scrutiny Committee 2021/22 Annual Report  Audit & Scrutiny Committee Chair Annual
Strategic Risk Register – Assurance Mapping Chief Internal Auditor Annual
Strategic Risk Register Update  Chief Executive Annual
Trust Fund Annual Accounts  External Audit Annual
Page 169

Page 170

Audit & Scrutiny Committee Work Plan 2022 – 2023 
Local Government in Scotland Overview 2022 Audit Scotland Annual
Counter Fraud Annual Update (End of 2 year pilot) Chief Internal Auditor Annual 
Page 170

Page 171

ARGYLL AND BUTE COUNCIL   AUDIT AND SCRUTINY
COMMITTEE 
ROAD AND INFRASTRUCTURE SERVICES     15 SEPTEMBER 2022 
WASTE STRATEGY UPDATE 
1.0 EXECUTIVE SUMMARY 
1.1  This report is a covering report, to which is appended the Waste Strategy
Update Report to be presented to the Environment, Development and
Infrastructure Committee on 01/09/22. This provides the Audit and Scrutiny
Committee with an update on the work relating to the Waste PPP contract
and the progress on the options appraisal workstreams being taken
forward by Caledonian Economics. The report also sets out updates for
the Committee on Barr Environmental Limited, Renewi, the Scottish
Deposit Return Scheme (DRS), the Scottish Government’s Circular
Economy Proposals and the Scottish Government’s Energy from Waste
Review. 
RECOMMENDATIONS 
Members are recommended to:- 
 Note and consider the report and the approach being taken to
determine the most appropriate option for the Council regarding
waste disposal;
 Note the good progress being made in relation to the options
appraisal;  
  Note that a further report detailing the full appraisal and proposed
next steps will come forward to the December EDI committee,
providing information on the preferred option and outlining any
capital and revenue cost implications. 
Kirsty Flanagan, Executive Director with responsibility for Road and
Infrastructure Services 
Jim Smith, Head of Road and Infrastructure Services 
Policy Lead: Councillor Ross Moreland 
August 2022 
For further information contact: John Blake - Fleet, Waste & Transport
Manager
Page 171 Agenda Item 16a

Page 172

This page is intentionally left blank

Page 173

Document is Restricted
Page 173 Agenda Item 16bNOT FOR PUBLICATION by virtue of paragraph(s) 6
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 174

This page is intentionally left blank