Page 1

Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 605522
DX 599700 LOCHGILPHEAD 
14 January 2026 
NOTICE OF MEETING 
A meeting of the PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE will be
held BY MICROSOFT TEAMS on WEDNESDAY, 21 JANUARY 2026 at 11:00 AM, which you are
requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. MINUTES 
(a) Planning, Protective Services and Licensing Committee held on 12
December 2025 (Pages 3 - 6)  
(b) Planning, Protective Services and Licensing Committee held on 17
December 2025 at 10.30 am (Pages 7 - 20)  
(c) Planning, Protective Services and Licensing Committee held on 17
December 2025 at 2.30 pm (Pages 21 - 22)  
(d) Planning, Protective Services and Licensing Committee held on 17
December 2025 at 3.30 pm (Pages 23 - 24) 
4. VOLTALIA UK LTD (SCOTTISH GOVERNMENT CONSULTATION): SECTION 36
CONSULTATION TO CONSTRUCT AND OPERATE 6 WIND TURBINES WITH A
GROUND TO BLADE TIP HEIGHT OF 200 METRES, AND ASSOCIATED
INFRASTRUCTURE INCLUDING BATTERY ENERGY STORAGE SYSTEM AND
COMPOUND (BESS) - CRUACH CLENAMACRIE WIND FARM: LAND AT
GLENLONAN APPROXIMATELY 7KM EAST OF OBAN AND 5KM WEST OF
TAYNUILT (REF: 24/02242/S36) (Pages 25 - 88)  
Report by Head of Development and Economic Growth 
Public Document Pack

Page 2

5. MR AND MRS SCOTT RAEBURN: ERECTION OF TEAROOM WITH 4
APARTMENTS ON UPPER FLOORS: FORMER SUSY'S TEAROOM,
TIGHNABRUAICH (REF: 25/00181/PP) (Pages 89 - 126)  
Report by Head of Development and Economic Growth 
6. CNOC BUIDHE WIND ENERGY HUB LIMITED: SECTION 36 CONSULTATION:
CNOC BUIDHE WIND FARM ENERGY HUB, COMPRISING A WIND FARM OF UP
TO 29 WIND TURBINES, WITH 14 OF THESE UP TO 180M TO BLADE TIP AND
15 UP TO 200M TO BLADE TIP, WITH ANCILLARY ENERGY STORAGE AND
ASSOCIATED INFRASTRUCTURE: APPROXIMATELY 2.5 KM EAST OF
BELLOCHANTUY AND 10 KM NORTHWEST OF CAMPBELTOWN (REF:
25/00600/S36) (Pages 127 - 176)  
Report by Head of Development and Economic Growth 
Planning, Protective Services and Licensing Committee 
Councillor John Armour Councillor Gordon Blair (Chair)
Councillor Jan Brown Councillor Audrey Forrest
Councillor Kieron Green (Vice-Chair) Councillor Amanda Hampsey
Councillor Daniel Hampsey Councillor Graham Hardie
Councillor Fiona Howard Councillor Mark Irvine
Councillor Andrew Kain Councillor Paul Donald Kennedy
Councillor Liz McCabe Councillor Dougie Philand
Councillor Peter Wallace   
Contact: Fiona McCallum                  Tel. No. 01546 604392

Page 3

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING
COMMITTEE held BY MICROSOFT TEAMS on FRIDAY, 12 DECEMBER 2025 
Present: Councillor Gordon Blair (Chair) 
Councillor John Armour
Councillor Jan Brown
Councillor Audrey Forrest
Councillor Kieron Green
Councillor Amanda Hampsey 
Councillor Graham Hardie
Councillor Fiona Howard
Councillor Andrew Kain
Councillor Dougie Philand 
Attending: Alida Lily Acherman, Licensing Standards Officer
Stuart McLean, Committee Manager
David Walker, Solicitor
Dr Chukwuna Okekeogbu, Applicant 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Daniel Hampsey, Mark Irvine, Paul
Donald Kennedy and Peter Wallace. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. CIVIC GOVERNMENT (SCOTLAND) ACT 1982, THE CIVIC GOVERNMENT
(SCOTLAND) ACT 1982 (LICENSING OF SHORT-TERM LETS)  ORDER
2022: APPLICATION FOR GRANT OF A SHORT-TERM LET LICENCE
(IFEA LIMITED, OBAN) 
The Chair welcomed everyone to the meeting.  In line with recent legislation for Civic
Government Hearings, the parties (and any representatives) were given the options for
participating in the meeting today.  The options available were by video call, by audio call
or by written submission.  For this hearing the Applicant opted to proceed by way of video
call and Dr Chukwuma Okekeogbu joined the meeting by MS Teams. 
It was noted that the three Objectors were not in attendance. 
The Chair invited the Licensing Standards Officer to speak to the terms of the report. 
Thereafter the procedure set out in Appendix 7 of the report was followed and the Chair
invited the Applicant to speak in support for their application. 
APPLICANT 
The applicant, Dr Okekeogbu advised that IFEA Ltd had been established when he moved
to Oban.  In that time 5 properties had been purchased for long term let in Oban, the
purchase of 4 John Anderson House was his first short term let property.  On purchasing 4
John Anderson House Dr Okekeogbu confirmed that he had spoken to the neighbours of
block 1 advising them of his intention of letting the property on a short-term basis and
addressed the concerns of the three objectors with them.  Dr Okekeogbu, stated that the
Page 3 Agenda Item 3a

Page 4

property would be maintained to a high standard, a noise monitoring device would be
fitted within the flat and highlighted that the flat has a dedicated parking space with
adjacent on street parking also available. The applicant also confirmed that he was willing
to partake in the maintenance of the common areas.   
QUESTIONS FROM OBJECTORS 
There were no objectors present at the meeting and members of the Committee were
directed to the written objections within the Agenda Pack. 
MEMBERS’ QUESTIONS 
There were no questions from the Members. 
SUMMING UP 
Applicant 
Dr Okekeogbu confirmed that he intends to use 4 John Anderson House as a short-term
let, will run and manage the property to a high standard and will respect everybody. 
When asked, the applicant confirmed that he had received a fair hearing. 
DEBATE 
Councillor Hardie stated he was suitably impressed with the applicant and the application
and was content to approve the application. 
Councillor Forest stated that given what can be considered regarding policies, she had no
objections and would be happy to approve the application. 
Councillor Kain advised that he could not support the application as the policy was not
consistent with other Council policies and that the conditions outlined in paragraph 6.1 of
the report were vague and unachievable. 
Councillor Green stated that he was sympathetic with the objectors in that some
properties within John Anderson House had changed from residential to short-term lets.
Councillor Green added that the conditions on the licence would alleviate concerns raised
and could see no reason but to approve the application. 
Councillor Brown advised that she was sympathetic with Councillor Kain’s position, that
she appreciated the work carried out by the applicant and was happy to approve the
application. 
Councillor Howard echoed Councillor Kain’s opinion adding that on the basis of the policy
could see no reason not to approve the application. 
Councillor Blair confirmed he would support the officer’s recommendation to approve the
application as the applicant has experience of managing similar properties. Councillor
Blair added that concerns around noise can be managed via the conditions of the licence. 
DECISION 
Page 4

Page 5

The Committee agreed to grant the Short-Term Licence to Dr Chukwuma Okekeogbu
subject to the inclusion of additional conditions set out in the report in respect of anti-social
behaviour, privacy and security, littering and waste disposal and damage to property and
noted that Applicant would receive written confirmation of this within 7 days. 
(Reference: Report by Regulatory Services and Building Standards Manager, submitted) 
Page 5

Page 6

This page is intentionally left blank

Page 7

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING
COMMITTEE held BY MICROSOFT TEAMS on WEDNESDAY, 17 DECEMBER 2025 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Amanda Hampsey
Councillor Graham Hardie
Councillor Fiona Howard 
Councillor Andrew Kain
Councillor Paul Donald Kennedy
Councillor Dougie Philand
Councillor Peter Wallace 
Attending: Stuart McLean, Committee Manager
Peter Bain, Development Manager
Alan Morrison, Regulatory Services and Building Standards Manager
Stuart Ramsay, Area Team Leader
Sandra Davies, Major Applications Team Leader
Shelley Gould, Senior Planning Officer 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Gordon Blair, Jan Brown, Audrey
Forrest, Daniel Hampsey, Mark Irvine and Liz McCabe. 
2. DECLARATIONS OF INTEREST 
Councillor Dougie Philand declared a non-financial interest in planning application
reference 22/00680/PP as a member of his family owned a substantial building firm within
the local area.  He left the meeting and took no part in the consideration of this application
which was dealt with at item 4 of this Minute. 
3. MINUTE 
The Minute of the Planning, Protective Services and Licensing Committee held on 18
November 2025 was approved as a correct record. 
Having declared an interest in the following item, Councillor Dougie Philand left the
meeting at this point. 
4. MACLEOD CONSTRUCTION LTD: ERECTION OF 8 DWELLINGHOUSES
AND FORMATION OF VEHICULAR ACCESS: LAND EAST OF KNOCK
FARMHOUSE, UPPER LOCHGAIR (REF: 22/00680/PP) 
The Area Team Leader spoke to the terms of the report.  This application is for planning
permission for a residential development on a site allocated for housing within the adopted
Argyll and Bute Local Development Plan (2024).  The principle of residential development
has therefore been established by the site’s allocation (ref: H3029). 
At the time of writing the report, public representations have been received from 41
respondents with 35 objecting to the scheme and 6 raising concern.  There have been no
objections from statutory consultees subject to planning conditions. 
It is the opinion of the Planning Authority that the representations received, together with
the Officer assessment of the relevant planning issues, provided all the information
required to enable Members to make an informed decision based on the material
Page 7 Agenda Item 3b

Page 8

considerations in this case.  It is therefore not considered that the objections raise any
complex or technical issues that have not been addressed in the report of handling, and it
is not considered that a discretionary hearing would add value to the planning process. 
The proposal accords with the policy provisions of the adopted National Planning
Framework 4 and Local Development Plan 2 and it was recommended that planning
permission be granted subject to the conditions and reasons detailed in the report of
handling. 
Motion 
To agree to grant planning permission subject to the conditions and reasons detailed in
the report of handling. 
Moved by Councillor Kieron Green, seconded by Councillor Peter Wallace. 
Amendment 
To agree to hold a pre-determination hearing. 
Moved by Councillor Paul Kennedy, seconded by Councillor Graham Hardie. 
A vote was taken by calling the roll. 
Motion   Amendment 
Councillor Armour  Councillor A Hampsey
Councillor Green  Councillor Hardie
Councillor Howard  Councillor Kain
Councillor Wallace  Councillor Kennedy 
On there being an equality of votes, the Chair made his casting vote in favour of the
Motion. 
The Motion was carried by 5 votes to 4 and the Committee resolved according. 
Decision 
The Committee agreed to grant planning permission subject to the following conditions
and reasons: 
Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 31/03/2022, supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
Page 8

Page 9

obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan 4724/101  01/04/2022
Site Plan 4724/102 J 18/07/2025
Longitudinal
Section along
A83 showing
visibility heights
4724/117 D 15/07/2025
Proposed Floor
Plans Plot 1
4724/103  01/04/2022
Proposed
Elevations Plot 1
4724/104  01/04/2022
Proposed Floor
Plans Plot 2
4724/105  01/04/2022
Proposed
Elevations Plot 2 
4724/106  01/04/2022
Proposed Floor
Plans Plot 3
4724/107  01/04/2022
Proposed
Elevations Plot 3
4724/108  01/04/2022
Proposed Floor
Plans Plot 4
4724/109  01/04/2022
Proposed
Elevations Plot 4
4724/110  01/04/2022
Proposed Floor
Plans Plot 5 and
7
4724/111  01/04/2022
Proposed
Elevations Plot 5
and 7
4724/112  01/04/2022
Proposed Floor
Plans Plot 6 and
8
4724/113  01/04/2022
Proposed
Elevations Plot 6
and 8
4724/114  01/04/2022
Fence/Heat
pump details
4724/115  01/04/2022 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. PP – Affordable housing with Commuted Sum option 
Notwithstanding the effect of Condition 1, no development shall commence until a
scheme for the provision of affordable housing (as defined below) has been submitted
to and approved in writing by the Planning Authority. The scheme shall: 
a) Provide that a minimum of 25% of the approved dwellings are affordable homes;
b) Define those properties to be used as affordable homes;
Page 9

Page 10

c) Establish the timing of their provision relative to the phasing of the development,
which shall ensure that the last 25% of the dwellings within the development are
not commenced until the affordable housing phase has bene completed for
occupation;
d) Establish the arrangements to ensure the affordability of the affordable homes for
both initial and subsequent occupiers (including any discount rate applicable in
terms of (ii) below); OR
e) Alternatively, shall provide for an equivalent Commuted Sum Payment to the
Council’s Strategic Housing Fund having regards to the report ‘Valuation of
Commuted Sum Payments’ approved by Argyll and Bute Council on 27th June
2013. 
For the purposes of this condition ‘affordable homes’ are defined as being either: 
i) Social housing (rented or shared ownership or shared equity) managed by a
registered social landlord (a body registered under part 3 chapter 1 of the Housing
(Scotland) Act 2001, or any equivalent provision in the event of the revocation and
re-enactment thereof, with or without modification);
ii) Discounted low cost sale housing (subject to a burden under the Title Conditions
(Scotland) Act 2003), or any equivalent provision in the event of the revocation and
re-enactment thereof, with or without modification).
iii) Housing for sale or rent without subsidy, which is designed to be affordable and to
meet the housing needs of the majority of those households identified as in housing
need in the Local Housing Strategy or Housing Market Study i.e. one or two person
households on average income, with conditions attached to their missives to
prevent further extension, thereby helping to ensure that they are likely to remain
affordable to subsequent purchasers. 
The development shall be implemented and occupied thereafter in accordance with the
duly approved scheme for affordable housing. 
Reason: To accord with the provisions of the development plan in respect of affordable
housing provision. 
3. PP – Landscaping 
No development shall commence until a finalised scheme of boundary treatment;
surface treatment and landscaping has been submitted to and approved by the
Planning Authority. The scheme shall comprise a planting plan and schedule which
shall include details of: 
i) Existing and proposed ground levels in relation to an identified fixed datum;
ii) Existing landscaping features and vegetation to be retained;
iii) Location design and materials or proposed walls, fences and gates;
iv) Proposed soft and hard landscaping works including the location, species, and size
of every tree/ shrub to be planted;
v) A programme for the timing, method of implementation, completion and subsequent
ongoing maintenance for all planting
vi) A biodiversity statement demonstrating how the proposal will contribute to the
conservation/ restoration/ enhancement of biodiversity, and how these benefits
will be maintained for the lifetime of the development. 
Page 10

Page 11

The development shall not be occupied until such times as the boundary treatment,
surface treatment and any re-contouring works have been completed in accordance
with the duly approved scheme. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme during the first planting season following the commencement of the
development, unless otherwise agreed in writing by the Planning Authority. 
Any trees/shrubs which within a period of five years from the completion of the
approved landscaping scheme fail to become established, die, become seriously
diseased, or are removed or damaged shall be replaced in the following planting
season with equivalent numbers, sizes and species as those originally required to be
planted unless otherwise approved in writing by the Planning Authority.
The Biodiversity Statement should refer to Developing with Nature Guidance,
NatureScot as appropriate. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity, and to comply with the requirements of NPF4 Policy 3. 
4. PP – Footpath link 
No development or site clearance works shall commence, for the development hereby
permitted, until detailed planning permission has been granted for the footpath link
outwith the red line boundary as indicated on the approved Site Plan drawing number
“4724/102 Revision J”. 
Reason: to ensure that facilities are provided for the pedestrians that are generated by
the development and that they may access the existing footpath system without
interfering with the safety and free flow of traffic on the A83 trunk road. 
5. PP – Junction with Public Road 
Prior to the commencement of the development, the proposed access on the A83 trunk
road, as generally illustrated by the approved site plan, drawing number “4724/102
Revision J”, shall be constructed to a layout and type (and method) of construction to
be approved by the Planning Authority, in consultation with Transport Scotland.
Reason: To ensure that the standard of access layout complies with the current
standards and that the safety of the traffic on the trunk road is not diminished. 
6. PP – Trunk Road Drainage system 
There shall be no drainage connections to the trunk road drainage system.
Reason: to ensure that the efficiency of the existing drainage network is not affected. 
7. PP – Internal layout access 
Notwithstanding the provisions of Condition 1, the proposed accesses to the new
adoptable standard development road shall be formed in accordance with the
Council’s Roads Standard Details; and visibility splays of 25 metres to point X by 2.4
metres to point Y from the centre line of the proposed access. The access shall be
surfaced with a bound material in accordance with the stated Standard Detail Drawing.
Prior to work starting on site the access hereby approved shall be formed to at least
Page 11

Page 12

base course standard and the visibility splays shall be cleared of all obstructions such
that nothing shall disrupt visibility from a point 1.05 metres above the access at point X
to a point 0.6 metres above the public road carriageway at point Y. A dropped kerb
crossing point shall be provided at each access with the access surfaced for a distance
of 5 metres from back of footway. The final wearing surface on the access shall be
completed prior to the development first being brought into use and the visibility splays
shall be maintained clear of all obstructions thereafter. 
Reason: In the interests of road safety. 
8. PP – Construction Hours 
Notwithstanding the provisions of Condition 1, the construction of the development
hereby permitted shall be restricted to the specified hours of 0800-1800 hours Monday
to Friday, 0800 – 1300 hours Saturday and not at all on Sunday, Bank or Scottish
Public Holidays unless otherwise agreed in writing by the Planning Authority. 
Reason: To minimise the impact of noise, generated by construction activities on
occupiers of residential properties. 
9. PP – Parking and Turning
The provision of parking and turning for the development hereby permitted, shall
accord with the requirements of Policy 40 and Table 5 of the Argyll and Bute Local
Development Plan 2 2024. 
Reason: To ensure an adequate number of vehicle parking spaces to meet
development needs. 
10. PP- Finished Floor levels 
Notwithstanding the provisions of Condition 1, the finished ground floor levels of the
dwellings, hereby permitted, shall be at least 0.3m above surrounding ground level,
unless otherwise agreed in writing by the Planning Authority.
Reason: In order to ensure appropriate mitigation for flood risk and to ensure an
acceptable relationship between the development and its surroundings.
11. PP – Runoff Rate 
The post development runoff rate should be attenuated to the greenfield runoff rate
before discharge from site. Any drainage at the site should be designed in accordance
with CIRIA C753. 
Reason: In the interests of flood risk prevention. 
12. PP – Programme of Archaeological Works 
No development shall take place within the development site, as outlined in red on the
approved plan until the developer has secured the implementation of a programme of
archaeological works in accordance with a written scheme of investigation which has
been submitted to and approved in writing by the Planning Authority in consultation
with the West of Scotland Archaeological Service. Thereafter the developer shall
ensure that the programme of archaeological works is fully implemented and that all
Page 12

Page 13

recording and recovery of archaeological resources within the development site is
undertaken to the satisfaction of the Planning Authority in consultation with the West of
Scotland Archaeological Service. 
Reason: In order to comply with the requirements of NPF4 Policy 16F. 
13. PP – ASHP Noise limits 
The noise level from the operation of the air source heat pumps hereby approved must
not exceed 42dB LAeq (5 min) at 1 metre from the window of a habitable room on the
façade of any neighbouring residential property. If, in the opinion of the Local Planning
Authority the proposed air source heat pumps result in any noise nuisance to the
occupant of any neighbouring dwelling the Applicant shall install noise mitigation
measures in agreement with the Planning Authority.
Reason: To ensure that the residential amenities that occupiers can reasonably expect
to enjoy are adequately protected. 
14. PP – Contaminated Land Assessment 
No development, demolition or ground-breaking works shall commence until a scheme
is submitted by the Developer (at their expense) to identify and assess potential
contamination on site and approved, by the Planning Authority, and is thereafter
implemented in accordance with the scheme so approved. The scheme shall be
undertaken by a competent person or persons in accordance with relevant
authoritative guidance including PAN 33 (2000) and BS10175:2011 or, in the event of
these being superseded or supplemented, the most up-to-date version(s) of any
subsequent revision(s) of, and/or supplement(s) to, these documents. This scheme
should contain details of proposals to investigate and remediate potential
contamination to the satisfaction of the Planning Authority, and must include:- 
a) A desk study and development of a conceptual site model including (where
necessary) a detailed site investigation strategy. The desk study and the scope and
method of recommended further investigations shall be agreed with the Council
prior to addressing parts b, c, and d of this condition. 
Should the desk study show the need for further assessment this will be undertaken in
the following sequence: 
a) A detailed investigation of the nature and extent of contamination on site, and
assessment of the risks such contamination presents.
b) Development and agreement of a remedial strategy (if required) to treat/ remove
contamination ensuring the site is made suitable for its proposed use (this shall
include a method statement, programme of works, and proposed verification plan).
c) Submission of a verification report for any agreed remedial actions detailing and
evidencing the completion of these works. 
Written confirmation from the Planning Authority, that the scheme has been
implemented and completed shall be required by the Developer before any
development hereby approved commences. Where remedial measures are required as
part of the development construction detail, commencement must be agreed in writing
with the Planning Authority. 
Page 13

Page 14

Reason: To ensure that the potential risks to human health, the water environment,
property, and, ecological systems arising from any identified land contamination have
been adequately addressed. 
15. PP – Arrangements for Waste 
No development shall commence until a waste strategy detailing how much waste the
proposal is expected to generate and detailing the arrangements for the storage,
separation and collection of waste from the site, including provision for the safe pick up
by refuse collection vehicles, have been submitted to an approved in writing by the
Planning Authority. Thereafter the duly approved provision shall be implemented prior
to the first occupation of the dwellings which it is intended to serve. 
Reason: In order to ensure that satisfactory arrangements have been made for dealing
with waste on the site in accordance with NPF4 Policy 12. 
16. PP – Materials 
No development shall commence until full details /samples of materials to be used in
the construction of the dwelling houses hereby approved have been submitted to and
approved in writing by the Planning Authority. The development shall thereafter be
completed using the approved materials or such alternatives as may be agreed in
writing with the Planning Authority. 
Reason: In order to integrate the development into its surroundings. 
17. PP – Restriction of PD Rights 
Notwithstanding the provisions of the Town and Country Planning (General Permitted
Development) (Scotland) Order 1992 (as amended), (or any Order revoking and re-
enacting that Order(s) with or without modifications), nothing in Article 2(4) of or the
Schedule to that Order, shall operate so as to permit, within the area subject of this
permission, any development referred to in Part 1 and Classes 1A, 1B, 1C, 1D, 2A, 2B,
3A, 3AA, 3B, 3C, 3D and 3E and Part 2 and Classes 8 and 9 of the aforementioned
Schedule, as summarised below: 
PART 1: DEVELOPMENT WITHIN THE CURTILAGE OF A DWELLINGHOUSE 
Class 1A: Any enlargement of a dwellinghouse by way of a single storey ground floor
extension, including any alteration to the roof required for the purpose of the
enlargement. 
Class 1B: Any enlargement of a dwellinghouse by way of a ground floor extension
consisting of more than one storey, including any alteration to the roof required for the
purpose of the enlargement. 
Class 1C: The erection, construction or alteration of any porch outside any external
door of a dwellinghouse. 
Class 1D: Any enlargement of a dwellinghouse by way of an addition or alteration to its
roof.
Class 2A: The erection, construction or alteration of any access ramp outside an
external door of a dwellinghouse.
Class 2B: Any improvement, addition or other alteration to the external appearance of
a dwellinghouse that is not an enlargement. 
Class 3A: The provision within the curtilage of a dwellinghouse of a building for any
purpose incidental to the enjoyment of that dwellinghouse or the alteration,
maintenance or improvement of such a building. 
Page 14

Page 15

Class 3AA: The provision within the curtilage of a dwellinghouse of a building for any
purpose incidental to the enjoyment of that dwellinghouse.
Class 3B: The carrying out of any building, engineering, installation or other operation
within the curtilage of a dwellinghouse for any purpose incidental to the enjoyment of
the dwellinghouse.
Class 3C: The provision within the curtilage of a dwellinghouse of a hard surface for
any purpose incidental to the enjoyment of that dwellinghouse or the replacement in
whole or in part of such a surface. 
Class 3D: The erection, construction, maintenance, improvement or alteration of any
deck or other raised platform within the curtilage of a dwellinghouse for any purpose
incidental to the enjoyment of that dwellinghouse. 
Class 3E: The erection, construction, maintenance, improvement or alteration of any
gate, fence, wall or other means of enclosure any part of which would be within or
would bound the curtilage of a dwellinghouse.
PART 2: SUNDRY MINOR OPERATIONS 
Class 8: Formation of means of access to an unclassified road. 
Class 9: Stone cleaning or painting of the exterior of a building. No such development
shall be carried out at any time within this Part and these Classes without the express
grant of planning permission. 
Reason: To protect the sensitive area and the setting of the proposed dwellinghouses,
in the interest of visual amenity and public health, from unsympathetic siting and
design of developments normally carried out without planning permission; these
normally being permitted under Article 2(4) of the Town and Country Planning (General
Permitted Development) (Scotland) Order 1992 (as amended). 
18. PP – Provision of Play/ Amenity Space 
No development shall commence until details for the provision and maintenance of
areas of communal open space and equipped play area(s) relating to the development
been submitted to and approved in writing by the Planning Authority. The details shall
comprise EITHER: 
Direct Provision of Play/Amenity Space: 
i) Provision to satisfy the minimum standards set out in the Development Plan; 6sqm
of equipped play space and 12sqm of informal open space per dwelling unit;
ii) Specification of play equipment to be installed, including surface treatments and
any means of enclosure, designed in accordance with the provisions of BS5696
(Play Equipment Intended for Permanent Installation Outdoors);
iii) Proposals for the timing of the implementation of the play area(s) in relation to the
phasing of the development;
iv) A maintenance schedule for communal open spaces and equipped play areas in
accordance with the provisions of BS5696 including details of on-going inspection,
recording and procedures for detailing with defects. 
The communal open space and equipped play area(s) shall be provided in accordance
with the duly approved details and shall be retained and maintained to the specified
standards thereafter. 
OR: 
Indirect Provision of Play/Amenity Space:
Page 15

Page 16

The provision of a direct financial contribution to be held and administered by the
Council for the purpose of providing for the delivery of a commensurate play/amenity
space to serve the development within a later phase of the development of
designations H3029. 
The calculation of the value of the direct financial contribution will be based upon the
cost of delivery and ongoing maintenance of a facility which would meet the Council’s
minimum playspace requirements for the approved development as set out in the
Argyll and Bute Local Development Plan 2. 
The development hereby approved shall not be first occupied until such time as a
formal agreement between the developer and the Council for the payment and
administration of the direct financial contribution for the deferred provision of playspace
has been signed. 
Reason: In order to secure provision of communal open space and equipped play
areas within the development in accordance with the minimum standards set out in the
Development Plan. 
Note for the Applicant/Developer: It is noted that discharge of this condition by means
of ‘direct provision of play/amenity space’ would require to be the subject of a further
application for planning permission given that the development as approved does not
include sufficient site area to accommodate the requisite play/amenity space. It is
further advised that discharge of this condition by means of ‘indirect provision of
play/amenity space’ shall require to be the subject of an appropriate formal agreement
between the Developer and the Council under the provisions of either S75 of the Town
and Country Planning (Scotland) Act 1997, or the provisions of S69 of the Local
Government (Scotland) Act 1973. 
(Reference: Report by Head of Development and Economic Growth dated 4 December
2025, submitted) 
Councillor Dougie Philand returned to the meeting. 
5. MOWI SCOTLAND: REPLACE EXISTING 10 X 120M CIRCUMFERENCE
PENS WITH 6 X 160M CIRCUMFERENCE PENS (WITH A PARALLEL
MINOR RELOCATION INTO DEEPER WATER MOVING THE CARRADALE
SOUTH SITE CENTRE 99M EAST) AND SITING OF EXISTING FEED
BARGE IN A DIFFERENT LOCATION: CARRADALE SOUTH FISH FARM,
KILBRANNAN SOUND (REF: 24/01381/MFF) 
The Senior Planning Officer spoke to the terms of the report and to supplementary report
number 1 which advised that the Clyde Fishermen’s Association (CFA) had submitted two
further representations each reiterating their position of objection to the proposal.  A
response to these late representations from the Applicant was also contained within the
supplementary report.   Reference was also made to the contents of a late representation
received by Councillor Tommy MacPherson.  Councillor MacPherson’s raised some of the
issues also raised by CFA, along with a query regarding procedural matters during
handling of the planning application.  It was confirmed that the application was handled in
accordance with the requirements of the Town and Country Planning (Scotland) Act 1997,
the Town and Country Planning (Development Management Procedure) (Scotland)
Page 16

Page 17

Regulations 2013, and the Council’s Scheme of Delegation as set out within the Council’s
Constitution. 
Members were also advised of an error within Section A of the report of handling which
referred to 8 x 4 pens rather than 6 x 3 pens and also of an error within the supplementary
report regarding the date of the resubmission of amended plans due to changes in the
moorings was in September 2025 only.  The other resubmissions were to address scaling
issues. 
The application is for a change of equipment and minor relocation of an existing marine
fish farm in the Kilbrannon Sound approximately 400m off the eastern shore of the Kintyre
Peninsula and will continue to be serviced from the company’s existing shore base located
at Carradale Harbour.  There is to be no change to the consented biomass for the site and
the proposal is part of a wider 5 year project by the Applicant to upgrade and modernise
fish farming pens to bring about a number of benefits. 
The proposal would accord with the Development Plan policy and it was recommended
that planning permission be granted subject to the conditions and reasons numbered 1 –
17 detailed in the report of handling, and updated condition 18 detailed in supplementary
report number 1. 
Motion 
To agree to hold a site visit and pre-determination hearing. 
Moved by Councillor John Armour, seconded by Councillor Fiona Howard. 
Amendment 
To agree to grant planning permission subject to the conditions and reasons numbered 1
– 17 detailed in the report of handling, and updated condition 18 detailed in supplementary
report number 1. 
Moved by Councillor Andrew Kain, seconded by Councillor Paul Kennedy. 
A vote was taken by calling the roll. 
Motion   Amendment 
Councillor Armour  Councillor Green
Councillor A Hampsey Councillor Kain
Councillor Hardie  Councillor Kennedy
Councillor Howard
Councillor Philand
Councillor Wallace 
The Motion was carried by 6 votes of 3 and the Committee resolved accordingly. 
Decision 
The Committee agreed to hold a site visit and pre-determination hearing. 
Page 17

Page 18

(Reference: Report by Head of Development and Economic Growth dated 1
December 2025 and Supplementary Report Number 1 dated 16 December 2025,
submitted) 
6. MOWI SCOTLAND: REPLACE EXISTING 10 X 120M CIRCUMFERENCE
PENS WITH 6 X 160M CIRCUMFERENCE PENS (WITH A PARALLEL
MINOR RELOCATION INTO DEEPER WATER MOVING THE CARRADALE
NORTH SITE CENTRE 79M EAST) AND SITING OF EXISTING FEED
BARGE IN A DIFFERENT LOCATION: CARRADALE NORTH FISH FARM,
KILBRANNAN SOUND (REF: 24/01382/MFF) 
The application is for a change of equipment and minor relocation of an existing marine
fish farm in the Kilbrannon Sound approximately 400m off the eastern shore of the Kintyre
Peninsula and will continue to be serviced from the company’s existing shore base located
at Carradale Harbour.  There is to be no change to the consented biomass for the site and
the proposal is part of a wider 5 year project by the Applicant to upgrade and modernise
fish farming pens to bring about a number of benefits. 
The proposal would accord with the Development Plan policy and it was recommended
that planning permission be granted subject to the conditions and reasons numbered 1 –
17 detailed in the report of handling, and updated condition 18 detailed in supplementary
report number 1. 
Motion 
To agree to hold a site visit and pre-determination hearing. 
Moved by Councillor John Armour, seconded by Councillor Amanda Hampsey. 
Amendment 
To agree to grant planning permission subject to the conditions and reasons numbered 1
– 17 detailed in the report of handling, and updated condition 18 detailed in supplementary
report number 1. 
Moved by Councillor Andrew Kain, seconded by Councillor Paul Kennedy. 
A vote was taken by calling the roll. 
Motion   Amendment 
Councillor Armour  Councillor Green
Councillor A Hampsey Councillor Kain
Councillor Hardie  Councillor Kennedy
Councillor Howard
Councillor Philand
Councillor Wallace 
The Motion was carried by 6 votes of 3 and the Committee resolved accordingly. 
Decision 
The Committee agreed to hold a site visit and pre-determination hearing.
Page 18

Page 19

(Reference: Report by Head of Development and Economic Growth dated 4
December 2025 and Supplementary Report Number 1 dated 16 December 2025,
submitted) 
7. JOINT PUBLIC HEALTH PROTECTION PLAN 2025-2027 
Consideration was given to a report inviting Members to approve the Joint Public Health
Protection Plan 2025-2027 which outlines the health protection priorities for the period and
reviews the previous plan. 
Decision 
The Committee agreed: 
1. to approve the Joint Public Health Protection Plan (JHPP) for 2025-2027 (Appendix I),
recognising the key role of local authorities and environmental health; 
2. to formally reaffirm the appointments of the Regulatory Services and Building Standards
Manager, as the Council’s Designated Competent Person under the Public Health etc.
(Scotland) Act 2008, and the appointments of Depute Designated Competent Persons as
detailed in section 4.8 of this report and 4.2 of the JHPP; and 
3. that the Regulatory Services and Building Standards Manager signs the JHPP plan on
behalf of the Council and takes the necessary steps to deliver the plan. 
(Reference: Report by Executive Director with responsibility for Regulatory Services dated
17 December 2025 and NHS Highland Joint Health Protection Plan (JHPP) 2025-2027,
submitted) 
8. UPDATE ON RECENT TAYNUILT BESS APPEAL 
A report summarising a recent decision by Scottish Ministers following an Appeal in
respect of planning application reference 24/02083/PP was before the Committee for
information. 
Decision 
The Committee noted the contents of the report. 
(Reference: Report by Head of Development and Economic Growth dated 28 November
2025, submitted) 
9. LOCAL DEVELOPMENT PLAN 3 - EVIDENCE REPORT STAGE
ENGAGEMENT 
A report advising of the first stage of engagement for Local Development Plan 3 (LDP3)
was before the Committee for information. 
Decision 
The Committee noted the contents of this report and the engagement process that would
be undertaken to inform the LDP3 Evidence Report. 
Page 19

Page 20

(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 28 November 2025, submitted)
Page 20

Page 21

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING
COMMITTEE held BY MICROSOFT TEAMS on WEDNESDAY, 17 DECEMBER 2025 
Present: Councillor Gordon Blair (Chair) 
Councillor John Armour
Councillor Kieron Green
Councillor Graham Hardie 
Councillor Fiona Howard
Councillor Andrew Kain
Councillor Dougie Philand 
Attending: Stuart McLean, Committee Manager
David Walker, Solicitor 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Jan Brown, Audrey Forrest,
Amanda Hampsey, Daniel Hampsey, Mark Irvine, Paul Kennedy, Liz McCabe and Peter
Wallace. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. CIVIC GOVERNMENT (SCOTLAND) ACT 1982: APPLICATION FOR
GRANT OF TAXI CAR LICENCE (J ROBERTSON, APPIN) 
The Chair welcomed everyone to the meeting.  In line with recent legislation for Civic
Government Hearings, the parties (and any representatives) were given the options for
participating in the meeting today.  The options available were by video call, by audio call
or by written submission.   
For this hearing Applicant opted to proceed by way of written submission and a copy of
this was contained within the Agenda pack for this hearing. 
The hearing procedure that would be followed was noted and in the absence of the
Applicant the Chair invited the Committee Manager to read out the written submission. 
APPLICANT 
My name is James Robertson and my hearing for the application for grant of a Taxi car
licence is on the 17/12/25 at 2.30pm.
I would prefer to include a written representation as follows.
I have held a Private Hire Taxi Licence for the last few years. I am the only taxi operating
out in the Appin area. I feel that it would benefit, not only my own business, but customers
as well, if I was granted a Taxi Car Licence.
A lot of my business involves taxi hires from the Appin area into Oban. As I am a Private
Hire Taxi, I very rarely can pick up another hire in town as I cannot join the rank. It would
benefit me greatly if I had a Taxi licence as I could spend some time on the rank after
dropping my hire off instead of having to return to Appin without any more hires.
Page 21 Agenda Item 3c

Page 22

I also still see a need for more taxi coverage at the 11pm to 1am time slot. There still
would appear to be a lack of taxi operating at that time of night and also very early
mornings. 
DEBATE 
Councillor Hardie said that the written submission was straightforward and honest and
although he did not know the area well, he believed what had been stated and that he
would be happy to support the application. 
Councillor Green commented that it was a fair distance from Appin into Oban and it may
be someone would be looking for a lift there and back to attend an appointment.  He said
he would be happy to approve the application as this would allow the Applicant to pick up
other work in town while he waited to return to Appin. 
Councillor Howard agreed with Councillor Hardie and Councillor Green.  She commented
that the Applicant was currently working at a disadvantage as a Private Hire Operator
compared to Taxi Operators living closer to the town centre.  She confirmed that she
would support the application. 
Councillor Blair said it would be good to have another Taxi Operator in the area and that
granting this licence would allow the Applicant to take on other work while he was in town. 
He advised that on that basis he would be happy to grant the licence. 
DECISION 
The Committee unanimously agreed to grant a Taxi Car Licence to Mr Robertson and
noted that he would receive written confirmation of this within 7days. 
(Reference: Report by Head of Legal and Regulatory Support, submitted) 
Page 22

Page 23

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING
COMMITTEE held BY MICROSOFT TEAMS on WEDNESDAY, 17 DECEMBER 2025 
Present: Councillor Gordon Blair (Chair) 
Councillor John Armour
Councillor Kieron Green
Councillor Graham Hardie 
Councillor Fiona Howard
Councillor Andrew Kain
Councillor Dougie Philand 
Attending: Stuart McLean, Committee Manager
David Walker, Solicitor 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Jan Brown, Audrey Forrest,
Amanda Hampsey, Daniel Hampsey, Mark Irvine, Paul Kennedy, Liz McCabe and Peter
Wallace. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. CIVIC GOVERNMENT (SCOTLAND) ACT 1982: APPLICATION FOR
GRANT OF TAXI CAR LICENCE (C SPREADBURY, OBAN) 
The Chair welcomed everyone to the meeting.  In line with recent legislation for Civic
Government Hearings, the parties (and any representatives) were given the options for
participating in the meeting today.  The options available were by video call, by audio call
or by written submission.   
For this hearing the Applicant opted to proceed by way of audio call and Mr Spreadbury
joined the meeting by telephone. 
The Chair outlined the procedure that would be followed and invited the Applicant to
speak in support of their application. 
APPLICANT 
Mr Spreadbury advised that he was applying for this licence as his children were now of
an age where they were fairly independent.  He said that for the last 17 years he has
taken on the role of house parent to allow his partner to pursue her career.  He said that
he had previously been a lorry driver for 28 years for various companies and had been
depot Manager for West Coast Motors.  He said that driving had always been his passion
and that he liked to meet new people.  He referred to just finishing a 2 year term as
Captain of the local Golf club and that he enjoyed meeting and talking to people from all
over the world through that role. 
He advised that due to his love of driving and meeting and talking to people, he was
applying for this licence.  He added that his family have been local to Oban since the early
1890s. 
MEMBERS’ QUESTIONS 
Page 23 Agenda Item 3d

Page 24

Councillor Blair sought and received confirmation from Mr Spreadbury that he planned to
work 5.5 days over 7 days.  He said that he intended taking Tuesdays and Wednesdays
off and would start the mid shift on a Saturday.  He said that a friend who was a taxi driver
had been keeping him right with regard to the best shifts to do and when it was best to
take breaks.  He said that he would probably work Sundays as there were very little taxis
on the rank on a Sunday.  He advised that his two daughters worked at a restaurant on
the pier and that they struggled to get a taxi after an evening shift.  He referred to it being
difficult for people to get lifts to appointments and to events at the schools and he
commented that the local buses were irregular. 
Councillor Blair asked Mr Spreadbury if he believed there was a need for another taxi in
the town.  Mr Spreadbury said that he thought there was a need for another 6 or 8 taxis,
especially at the weekends.  He said that on Fridays, Saturdays, Sundays and Mondays
there was a serious lack of taxis on the rank and in the streets.  He advised that the friend
he had spoken about earlier had confirmed there was a need for more taxis in the area. 
SUMMING UP 
Applicant 
Mr Spreadbury said that his partner had been more or less the breadwinner over the last
few years and that he wanted to take some of the pressure off her and get back to work. 
He referred to regularly taking a family member to hospital appointments in Glasgow and
that these were usually scheduled for Tuesdays or Wednesdays and was another reason
why he planned to take these days off. 
Mr Spreadbury confirmed that he had received a fair hearing. 
DEBATE 
Councillor Green said he would be quite happy to approve the application.  He thought it
would be useful for the Applicant and would also benefit the wider community. 
Councillor Hardie said he agreed with Councillor Green.  He advised that he thought the
Applicant’s appraisal was excellent and that he would have no hesitation in granting the
licence. 
Councillor Kain also agreed that he would be happy grant the licence. 
Councillor Armour said he could not argue with anything that had been said and
commented that Mr Spreadbury had put his case across very well.  He advised that he
thought Mr Spreadbury would be an excellent asset to the taxi fraternity in town and that
he would have no hesitation in granting the licence. 
The Chair commented that Mr Spreadbury would be a good quality, caring driver and was
happy to approve the licence. 
DECISION 
The Committee unanimously agreed to grant a Taxi Car Licence to Mr Spreadbury and
noted that he would receive written confirmation of this within 7 days. 
(Reference: Report by Head of Legal and Regulatory Support, submitted)
Page 24

Page 25

Argyll & Bute Council
Development & Economic Growth   
This report is a recommended response to the Scottish Government’s Energy
Consents Unit (ECU) consultation on the Section 36 Consultation for Cruach
Clenamacrie Wind Farm, to construct and operate 6 wind turbines with a ground to
blade tip height of 200 metres, and associated infrastructure including Battery
Energy Storage System and compound (BESS), on land at Glenlonan, approximately
7km east of the centre of Oban 
Reference No: 24/02242/S36 / ECU00004841
Applicant: Voltalia UK Ltd (Scottish Government consultation)
Proposal: Section 36 Consultation to construct and operate 6 wind turbines with
a ground to blade tip height of 200 metres, and associated
infrastructure including Battery Energy Storage System and
compound (BESS), - Cruach Clenamacrie Wind Farm 
Site Address: Land at Glenlonan, approximately 7km east of Oban and 5km west of
Taynuilt 
(A)  THE APPLICATION 
Section 36 Application made up of the following key elements: 
• Six wind turbines up to a maximum blade tip height of 200 metres
• Foundations supporting each wind turbine
• Battery Energy Storage System Facility (BESS) and compound, with a capacity
of up to 20 MW
• New access tracks, passing places and turning heads
• Vehicular site access from the A85
• Access route through the Fearnoch Forest
• Hardstanding areas for cranes at each turbine
• Blade laydown areas
• Temporary construction compound, including parking and welfare facilities
• Watercourse crossings
• Drainage works
• Underground power cables and markers
• An on-site electrical substation and associated parking
• 2 borrow pits
• Aviation obstacle turbine lighting     
The expected operational life is 50 years from the date of commissioning. 
Connection to Electricity Grid - The grid connection would be to the Taynuilt
substation, which is located approximately 6.7km to the east of the proposed on-site
substation. 
Page 25 Agenda Item 4

Page 26

(B) RECOMMENDATION: 
That the ECU be notified accordingly that: 
(1) Argyll and Bute Council object to the proposal on landscape and visual
grounds, as the proposed wind farm would result in significant adverse
landscape and visual effects, contrary to NPF4 Policy 11 and LDP2 Policy
30.  
(2) Peat Landslide Hazard Risk Assessment - Argyll & Bute Council has been
unable to reach a conclusion in respect to the Peat Landslide Hazard Risk
Assessment (NPF4 Policies 5 and 11 and LDP2 30 and 79) as no response
has been provided by Ironside Farrar on the further information provided by the
Applicant.  Argyll and Bute Council OBJECT unless this issue is resolved to the
satisfaction of Ironside Farrar prior to the determination of this application by the
ECU.  Should this issue not be resolved the Council would defer to Ironside
Farrar (or any other body appointed by the ECU to provide expert guidance on
this matter) in the event of a PLI. 
(3) Archaeological Impact - Argyll & Bute Council has been unable to reach a
conclusion within the time afforded in respect to Archaeological Impact as
no response has been received from the West of Scotland Archaeology Service. 
Argyll and Bute Council are therefore not in a position to confirm whether the
proposal is consistent with the relevant provisions of NPF4 Policy 7 and LDP2
Policy 21 and would recommend that the ECU consider these matters prior to
determination. 
(4) Argyll and Bute do not object on noise impact grounds, subject to the
inclusion of an Operational Noise Planning Condition, as recommended
by the Council’s Noise Consultant, Mott MacDonald, specified in their
Review of Evidence – Noise, dated March 2025. 
(5) Argyll and Bute Council do not object on Public Access grounds, subject
to the inclusion of a condition requiring the developer to prepare an
Access Plan for approval by the Council prior to the commencement of
construction. 
(6) Argyll and Bute Council do not object on Roads grounds, subject to the
inclusion of relevant conditions, as specified by Transport Scotland in
their consultation response to the ECU dated 04/02/25. 
(7) Argyll and Bute Council requests that the recommendations of the
Council’s Local Biodiversity Officer are considered by the ECU, including: 
Recommend that the applicant continue discussions with NatureScot and SEPA
to ensure best practice for peat extraction and restoration. 
While the impact to bats is unlikely to be significant, it would be advisable to
monitor any fatalities that may occur from collision as they are found to forage
within the wind turbine areas. This information will feed into mitigation measures
which can be altered accordingly, to ensure any negative impacts to foraging /
commuting bats is minimal. 
Recommend that due to the presence of black grouse in the area, the applicant
Page 26

Page 27

should ensure the fences are clearly marked and that a programme of monitoring
fences for any potential black grouse carcasses is implemented 
Recommend that the applicant continues discussions with relevant
organisations, to ensure that appropriate mitigation and enhancement measures
are adhered to and potential impacts are minimal.   
(8) Ornithology: Whilst NatureScot has not objected to this issue, it is noted
that they consider the proposed development may result in significant
impacts on Schedule 1 bird species and a regionally important black
grouse population. It is recommended that the ECU gives further
consideration to this issue before determining the application. 
(9) Argyll & Bute Council requests that all other conditions recommended by
consultees are included in any Consent. 
(C) CONSULTATIONS: 
ENERGY CONSENTS UNIT RESPONSES 
NatureScot (4/04/25) – do not object and have advised the ECU that the proposal
does not raise issues of national interest, however, they summarise the key
considerations to be: 
• Significant landscape and visual effects on the Lynn of Lorn National Scenic Area
(NSA), which are not considered to be easily overcome by siting, design or other
mitigation; 
• Significant impacts on Schedule 1 bird species and a regionally important black
grouse population, which are not considered to be easily overcome by siting, design
or other mitigation. 
Landscape and Visual Impacts 
The proposal would result in significant adverse effects on Special Landscape
Qualities 2 - A small scale, low-lying landscape within a vast highland backdrop and
4 – The coastline of great variety and diversity of the Lynn of Lorn NSA. They
consider these effects would result from the siting of the Proposal and would be
compounded by the vertical scale of the turbines and are not considered to be easily
overcome by siting, design or other mitigation. 
In addition, they consider that the siting and the vertical scale of the Proposal within
the Craggy Uplands with Settled Glens LCT would give rise to extensive effects on
the surrounding distinctive, small-scale coastal landscape and seascape north-west
of the Proposal. 
They consider that the LVIA under-estimates the extent of effects from the visible
aviation lighting of the Proposal. In addition to effects concluded in the LVIA, the
Proposal would introduce a new and significant effect of turbine lighting into areas
south-west of the proposal out to around 7km. 
They consider that the Proposal, in combination with the application stage Corr
Chnoc scheme (ECU00006023), would be likely to result in the perception of the
Page 27

Page 28

Craggy Uplands LCT as being a landscape where wind farm development
comprised a dominant characteristic, in effect changing its character from an upland
landscape with wind farms to a ‘Wind Farm Landscape’. 
Ornithology 
While the proposed impacts on ornithological receptors do not raise issues of
national interest, NatureScot do have a number of concerns regarding the Proposal,
namely: 
- This six turbine Proposal has a disproportionately high potential impact for its size
and as a small site there are significant concerns about whether it could be built in
compliance with the Wildlife and Countryside Act (1981)(as amended) in relation to
reckless offences based on the submitted EIAR. 
- It has the potential to exclude golden eagles from 2-3% of a territory. Whilst not at
a level that would make the territory unviable, this is high for such a small Proposal.
Four out of the six turbines impact the eagle territory. 
- It has potential to cause displacement/abandonment of black grouse lek sites for
what appears to be a regionally important population: we consider all four leks sites
connected. None of the leks sites have been suitably buffered. This is almost
impossible to do without removal of T6 and T7 (original scheme proposed 8 no
turbines). 
- It has the potential to cause displacement of up to two pairs of hen harrier. Not all
nest sites have been suitably buffered. The lower end of our recommended
disturbance distance buffer has been used (300m) and even then turbines have
been proposed within 300m; contradicting statements in the ES that they have. 
Ecology 
Protected sites – Loch Etive Woods Special Area of Conservation (SAC) 
The Proposal is immediately adjacent to Loch Etive Special Area of Conservation
(SAC) designated for its alder woodland on floodplains, mixed woodland on base-
rich soils associated with rocky slopes, western acidic oak woodland and otter (Lutra
lutra). In NatureScot’s view, this Proposal is likely to have a significant effect on
mixed woodland on base-rich soils associated with rocky slopes of Loch Etive
Woods SAC. Based on the information provided, the conclusion of NatureScot is
that the Proposal will not adversely affect the integrity of the site 
Otter 
Otters are a feature of interest of Loch Etive Woods SAC. In NatureScot’s view, it is
unlikely that the Proposal will have a significant effect on any otter, either directly or
indirectly. An appropriate assessment is therefore not required with regards to otter.
Otter use of an area can change over time so they should be included in pre-
construction survey work. The Applicant should get in touch if otters are located. 
Marsh Fritillary 
Although Marsh Fritillary were not located during the Applicants survey work,
Butterfly Conservation Scotland have identified breeding Marsh Fritillary at the site.
Page 28

Page 29

The Applicant may want to do further assessment to consider impacts on the
species. 
NatureScot (17/10/25) – have advised the ECU that in terms of Landscape and
Visual Impact, they continue to consider the proposed development does not raise
issues of national interest, however they consider the proposed development would
result in significant landscape and visual effects on the Lynn of Lorn National Scenic
Area (NSA). The potential for these effects was addressed in the FEI submission
and NatureScot advises it has nothing further to add to its response of 4 April 25. 
In terms of Ornithology, NatureScot consider the proposed development may result
in significant impacts on Schedule 1 bird species and on a regionally important black
grouse population. Following the consultation on FEI a response was received
providing the following updates: 
• Hen Harrier – The Applicant needs to ensure they identify where the nests are pre
and during construction. This will pose constraints during the construction phase,
not just operational, and therefore the Applicant should have plans to mitigate the
constraints. NatureScot reiterate the previous advice that the 750m buffer around
an active nest will be hard to implement without stopping construction or operational
maintenance in the breeding season. The discussion around mitigation and potential
displacement of the hen harriers needs to consider that they are listed on Schedules
1 and 1A of the Wildlife and Countryside Act 1981 (WCA) which includes reckless
harassment at any time of year. There is an assumption that birds will relocate if
disturbed and breed elsewhere, however, there is no guarantee this will happen. It
is for the Applicant to be confident that their mitigation complies with the legislation.
NatureScot recommend a protection plan be put in place with backstops, to
minimise the risk of a WCA offence should mitigation not be adequate. 
• Black Grouse - NatureScot advise that works should be delayed until lekking has
finished before starting works each day. They also support the additional pre
construction black grouse surveys that will be carried out at the site; noting that
regularity of use on these leks may have changed since 2021/2022 and will inform
mitigation more accurately. 
• Golden Eagle - NatureScot acknowledge the new range value and other
inconsistencies that have been corrected. They also noted in their response of the
4 April 2025 that the level of territory loss would not make the territory unviable. 
The ECU have asked the applicant to review this response and confirm how they
are planning to address the points raised.   
RSPB Scotland (13/02/25) – advised the ECU they are not providing comment on
the application. 
Historic Environment Scotland (HES) (6/02/25) – advised the ECU that the
proposed wind farm would have an adverse impact on the setting of a number of
monuments (in particular Barguillean Farm, dun 250m SSW of (SM3930),
Dunstaffnage Castle (SM90120), Ardchattan Priory, priory, burial ground and
carved stones (SM13644), and the cluster of prehistoric burial monuments at the
south-west end of Loch Nell, including Dalineun, chambered cairn 265m S of
Dalaneas (SM4155). The severity of these impacts is, however, not such as to result
in an objection. However, deletion, relocation or lowering the height of T6 would
meaningfully reduce the likely adverse impacts on the setting of Barguillean Farm,
Page 29

Page 30

dun 250m SSW of (SM3930), and a similar redesign of T1 and T2 would
meaningfully reduce the likely adverse impacts on the setting of Dalineun,
chambered cairn 265m S of Dalaneas (SM4155) and Dalaneas, chambered cairn
90m SSE of, & cairns 30m SW of & 100m SSW of (SM4156). 
Historic Environment Scotland (HES) (25/09/25) – further advise the ECU that
they have considered the FEI information received and that they do not have any
comments to make on the additional information provided, or on the minor design
changes described. HES decision not to provide comments should not be taken as
their support for the proposals. This application should be determined in accordance
with national and local policy on development affecting the historic environment,
together with related policy guidance. 
Taynuilt Community Council (21/01/25) – advise that following a public meeting
on 20th January 2025 to discuss the application, they have no adverse comments to
make. 
Glenorchy and Innishail Community Council (28/02/25) – advise that they object
to the proposal on the grounds of the cumulative environmental impact of the
proposed developments around Loch Awe and surrounding area, which they
consider is excessive. 
Oban Community Council (13/03/25) – advise that following a recent public
meeting to discuss the application, they have agreed that they will not submit a
representation / objection to the proposed wind farm. 
Connel Community Council (17/02/25) – advise that they formally object to the
proposed wind farm development. Reasons are summarised below: 
Unsuitable / Inappropriate for the Local Area:
• The valley is too small for such infrastructure.
• The development would harm scenic landscapes and historical sites.
• Negative impact on tourism and local businesses.
Cumulative Infrastructure Concerns:
• Existing wind farm and hydro power scheme at Cruachan already present.
• Additional further developments would strain local infrastructure and roads.
Environmental Impact:
• Disruption to wildlife, including rare species like the Marsh Fritillary butterfly.
• Concerns about peatland destruction, despite developer claims.
• Ecological risks to watercourses and private water supplies.
Health and Quality of Life:
• Noise, infrasound, shadow flicker and light pollution affecting residents and
animals.
• Safety concerns over battery systems and potential pollution.
Economic Consequences:
• Limited local job creation; most roles filled by external contractors.
• Long-term harm to tourism-dependent businesses like B&Bs and cabins.
Lack of Consultation and Transparency:
• Inadequate communication with residents during the planning process.
• Many were unaware of the application being lodged.
Planning and Safety Issues:
• Fire safety and water storage not properly addressed.
• Contradictions with local development plan policies and NatureScot guidance.
Support for Alternative Energy:
Page 30

Page 31

• Local preference for hydro pumped storage as a viable alternative to wind
power.
• Hydro schemes are seen as more sustainable and beneficial for local
employment, with fewer negative impacts on the landscape and local
communities. 
Scottish Forestry (30/01/25) – advised the ECU that they note that the woodland
impacts are associated with the access track, widening and extending to the
development. They recognise that the proposed woodland removal is small with
limited impacts. However, the woodland types are important and advise that: 
• A PAWS and native woodland (Dailnamac) plan should be provided which
quantifies the area of PAWS lost to the development and proposes compensatory
planting in exceedance of the area lost. 
• Compensatory planting should be secured by a planning condition. 
Scottish Forestry (17/10/25) – advised the ECU that they have requested the
following amendments / information: 
• The proposals should demonstrate full compliance with UKFS
• Felling and Restocking should be considered in the context of the Argyll and
Bute Local Development Plan 2 and associated policies on Forestry and
Forestry Removal in line with the adopted Forest and Woodland Strategy
• Clarification of the total area of permanent woodland loss
• Compensatory planting for the woodland lost should be secured by condition. 
The ECU have asked the applicant to review this response and confirm a timeframe
for addressing the points raised. 
Scottish Forestry (12/11/25) – advised the ECU that they have reviewed the further
comments and clarifications received from the applicant, and following this can
confirm that Scottish Forestry’s initial concerns have now been addressed. 
The Woodland Trust (4/03/25) – advised the ECU that they didn’t have capacity to
respond to the initial consultation request within the timescales stated, however,
state that they do have concerns regarding this application as the access road is
within ancient woodland. As such they would appreciate the opportunity to comment
at a later stage in the process. 
To date no further comments from this consultee have been received by the ECU.       
Transport Scotland (TS) (4/02/25) – confirmed that they are satisfied with the
submitted EIAR and that have no objection to the development in terms of
environmental impacts on the trunk road network. They would, however, request
that the following conditions be attached to any consent that may be granted: 
• Condition 1: The proposed means of access to the trunk road should be submitted
for approval by the Planning Authority in consultation with Transport Scotland as
trunk road authority and, thereafter, implemented prior to the commencement of
development. Reason: To minimise interference with the safety and free flow of the
traffic on the trunk road. 
Page 31

Page 32

• Condition 2: Prior to commencement of deliveries to site, the proposed route for
any abnormal loads on the trunk road network must be submitted to and approved
by the Planning Authority, in consultation with Transport Scotland as the trunk roads
authority. Reason: To minimise interference and maintain the safety and free flow
of traffic on the Trunk Road as a result of the traffic moving to and from the
development.   
• Condition 3: Prior to the movement of any abnormal load, any accommodation
measures required on the trunk road network, including the removal of street
furniture, junction widening and traffic management must be approved and
implemented to the satisfaction of the Planning Authority, in consultation with
Transport Scotland. Reason: To minimise interference and maintain the safety and
free flow of traffic on the Trunk Road as a result of the traffic moving to and from the
development. 
• Condition 4: Prior to the movement of any components and/or construction
materials, any additional signing or temporary traffic control measures deemed
necessary on the trunk road network due to the size or length of any loads being
transported must be undertaken by a recognised QA traffic management consultant,
to be approved by Transport Scotland. Reason: To ensure that the transportation of
any components/materials will not have any detrimental effect on the road and
structures along the route. 
• Condition 5: Prior to commencement of the development, a Construction Traffic
Management Plan (CTMP) shall be submitted to, and approved by, the Planning
Authority, after consultation with Transport Scotland. Thereafter, all construction
traffic associated with the development shall conform to the requirements of the
agreed Plan. Reason: To minimise interference and maintain the safety and free
flow of traffic on the Trunk Road as a result of the traffic moving to and from the
development. 
In addition to the above Conditions, the applicant should be informed of the following
advisory notes setting out requirements relating to works within the trunk road
boundary: 
I. The applicant should be informed that the granting of planning consent does
not carry with it the right to carry out works within the trunk round boundary
and that permission must be granted by Transport Scotland Roads
Directorate. 
II. Trunk road modification works shall, in all respects, comply with the Design
Manual for Roads and Bridges and the Specification for Highway Works
published by HMSO. The developer shall issue a certificate to that effect,
signed by the design organisation. 
III. Trunk road modifications shall, in all respects, be designed and constructed
to arrangements that comply with the Disability Discrimination Act: Good
Practice Guide for Roads published by Transport Scotland. The developer
shall provide written confirmation of this, signed by the design organisation. 
IV. The road works which are required due to the above Conditions will require
a Road Safety Audit as specified by the Design Manual for Roads and
Bridges. 
Page 32

Page 33

V. Any trunk road works will necessitate a Minute of Agreement with the Trunk
Roads Authority prior to commencement. 
VI. To obtain permission to work within the trunk road boundary the developer
should contact the Area Manager through the general contact number 0141
272 7100. 
VII. The Operating Company has responsibility for co-ordination and supervision
of works and after permission has been granted it is the developer's
contractor's responsibility to liaise with the Operating Company during the
construction period to ensure all necessary permissions are obtained. 
Transport Scotland (TS) (26/09/25) – advise that having reviewed the FEI, can
confirm that the comments made in their original response remain valid, and that
they have no further comments to make. 
SEPA (Scottish Environment Protection Agency) (19/02/25) – advised the ECU
that they have a holding objection due to a lack of information and a requirement for
suggested modifications in relation to peat and turbine / track siting. 
Impact on the water environment 
Terms of impacts on the water environment, SEPA request the applicant modifies
the proposal in locations encroaching into the 50m watercourse buffer, to ensure
and/or illustrate turbine locations have no deep excavations (greater than 1m)
impinging on the 50m watercourse buffers. SEPA also object to T4 in its current
location until it can be demonstrated no culverting for land gain will be required to
enable this turbine at this location. In addition, it is unclear what earthworks will be
necessary to enable the T3 access road and hardstandings. SEPA object to these
elements until further information is submitted to illustrate earthworks will not
encroach within 15m of the adjacent watercourse. 
In respect of watercourse crossings, and in order to comply with NPF4 Policy 22,
SEPA request a condition ensuring the design and implementation of any new or
upgraded watercourse crossing is designed to convey the 1 in 200 year including
climate change flows and will be a clear span structure unless otherwise agreed
with the Planning Authority in consultation with SEPA. Crossings are to be designed
in line with SEPA's Good Practice Guidance on watercourse crossings, WAT-SG-
25, and WAT-PS-06-02 Culverting of Watercourses. 
The Appendix 2 from SEPA requests a number of modifications to the infrastructure
layout, including relocation of access tracks, which may reduce the number of
watercourse crossings which would support the mitigation hierarchy of avoidance
as the first principle. 
Impact on carbon rich soils 
SEPA advise that the Figures showing Peat Depth (Figures 9.1.6a-f) are difficult to
assess due to blocking out of information with peat depth numbers which have a
white background. It is also difficult to know which spot depth relates to which circle
in the denser probed areas. In addition, the colours used to differential between
different peat depths, in particular, the different colours of green are too similar to
distinguish the depths of the individual probes. SEPA request the use of other
colours apart from green for depths deeper than 1m in future submissions by this
consultant. They also require any future plans to be at a larger scale.
Page 33

Page 34

Terms of minimising the disturbance of peat, SEPA request Figures 9.1.6a-f along
with Figures 5.7a-m are amended to clearly indicate the location of tracks in relation
to deeper peat and to clarify the additional use of floating tracks in these areas and
submitted for their review prior to any consent being granted. In addition, whilst
SEPA do not object to a small proportion of excavated peat being used in the
restoration of borrow pits in principle, they have concerns over the amount of
catotelmic peat that is proposed to be used in this activity. As no further details have
been submitted in relation to the proposed borrow pit restoration, SEPA cannot
advise the Scottish Minister on whether the proposed reuse of excavated peat in the
borrow pit areas will comply with NPF4 policy 5 in terms of restoring and / or
enhancing the site into a functioning peatland system capable of achieving carbon
sequestration, or whether the use of peat would constitute waste disposal
operations. 
Groundwater Dependent Terrestrial Ecosystems (GWDTE) 
SEPA note some small areas of moderately dependent habitat will be impacted by
the development, however, agree that these habitats are mostly rain/surface water
fed. The mitigation currently suggested around these habitats in Section 5.1 of
Appendix 9.3 Groundwater-Dependent Terrestrial Ecosystems Assessment and
further use of floating roads should be sufficient to minimise any further impacts.
SEPA request these mitigation measures are secured by condition. 
Micrositing 
SEPA request that a Micrositing limit of 50 metres is applied to all built elements of
the application, and that micrositing be subject to additional restrictions.     
SEPA (Scottish Environment Protection Agency) (20/09/25) – advised the ECU
that they continue to maintain their objection to the application due to a lack of
information. They request that determination is deferred until the information
outlined below has been provided for assessment: 
• The Additional Information Figures 3.4 are underlain with peat depth
information to illustrate the revised layouts have decreased the potential
negative impacts on peat. 
• A revised Appendix 9.2 Outline Peat Management Plan with revised peat
volume tables is submitted to accompany the revised layouts to demonstrate
clearly that the revised layouts have decreased the potential negative
impacts on peat. 
In addition, advise that the previous comments provided in their response dated 19
February 2025 (SEPA ref PCS-20003941) regarding the readability and clarity of
peat depths on the original EIAR Figures 9.1.6a-f should be fully considered by the
applicant when submitting the additional information requested above. 
SEPA (Scottish Environment Protection Agency) (16/10/25) – advised the ECU
that they continue to maintain their objection to the application due to a lack of
information and potential negative impacts on peat. They SEPA have requested the
following amendments / information: 
Page 34

Page 35

• T1 location should be modified further south-west to avoid areas of deep
peat.
• The applicant is requested to commit to micrositing T2 further off peat where
possible.
• The access track between T2 and T4 should be relocated off the areas of
deepest peat.
• The applicant is requested to commit to micrositing T3 further south off the
deep peat.
• The access track and watercourse crossing between T3 and T4 should be
moved north off the areas of deepest peat.
• The access track for T4 should be relocated off deep peat and the
hardstanding and T4 are relocated 10-20m northwest to remove the
hardstanding off the deepest peat. SEPA will accept reducing the
watercourse buffer in this area to 30m for excavations greater than 1m.
• T5 base should be moved 10-20m northeast to an area of shallower peat. 
• T6 turbine infrastructure should be south east off deeper peat. 
• The substation/BESS/construction compound should be relocated off the
areas of deep peat either by reconfiguration of the area or whole
infrastructure area further north/northeast.
• It is recommended the updated Figure 9.2.1, if not submitted, is submitted
as part of this application prior to any consent being issued.
• SEPA have also made a number of comments on the Standard Conditions
which should be reviewed. 
The ECU asked the applicant to review this response and confirm a timeframe for
preparing and submitting the clarification required. 
SEPA (Scottish Environment Protection Agency) (11/11/25) – following the
submission of additional information, SEPA have advised the ECU that in relation
to watercourse buffers, they previously requested a minimum watercourse buffer of
15m, and that this should be secured by planning condition. SEPA’s position on this
remains the same: whilst it is welcomed that the layout amendments have resulted
in a lesser extent of encroachment into the watercourse buffers, it is not entirely
clear whether this has resulted in some of the infrastructure being moved outwith
the watercourse buffers, or how far into the buffer infrastructure remains. In addition,
no location specific reasoned justification has been provided on what the “other
environmental and engineering constraints” are that prevent this from occurring.
SEPA therefore continue to request that a minimum watercourse buffer of 15m for
any earthworks associated with infrastructure, including access tracks, be secured
by condition. 
In relation to peat and carbon rich soils, SEPA previously set out a table (appendix
1 of their 16 October letter) indicating where further modifications or detailed
justification were required. SEPA are satisfied that adequate justification has now
been provided, enabling them to update their advice as follows: 
• SEPA continue to request a condition that the applicant commits to
micrositing T3 further south off areas of deep peat.
• Also request that a condition be placed on any approval that the applicant
commits to micrositing T6 away from areas of deeper peat.   
SEPA note and welcome that the applicant does not have any objections to their
previously proposed conditions for other matters. Therefore, SEPA advice on other
matters that require to be secured by condition remains as that set out in Appendix
Page 35

Page 36

2 of their 16 October 2025 letter (albeit recognising that some of the references to
EIA Report figures will require amending to refer to the relevant FEI figures). SEPA
ask that these planning conditions be attached to any consent, if granted. If these
will not be applied, then SEPA ask that their final response be considered as an
objection.   
Argyll District Salmon Fishery Board (ADSFB) (9th January 2025) – have advised
the ECU that they note that the initial surveys of fish and fish habitat cover the
proposed access route but do not include the wind farm site itself. Argyll DSFB’s
remit is to conserve population of migratory salmonids which have been identified
to be present in the lower reach of both the River Luachragan and Allt an Taillir.
ADSFB therefore urge that in the event of the proposed wind farm being granted
planning permission that monitoring of Water quality, macroinvertebrates, and fish
should be undertaken to Scottish Government guidelines, which include sites within
the reaches of habitat in both catchments where salmon and sea trout are present. 
Butterfly Conservation Scotland (28/08/25) - advise that they appreciate that their
comments have been taken on board by the developer, and that they are satisfied
that with what the applicant is proposing to address them. Further, they suggest that
it would be good to see a plan developed with a timeline for the HMU, e.g. in terms
of frequency of habitat monitoring and for reviewing its management and success
etc. 
Buglife Scotland (9/09/25) – advise that it is welcomed that steps are being taken
through pre-construction surveys to avoid translocation of Marsh Fritillary. This will
obviously require surveys at the correct time of year to identify larval food webs and
hopefully include enough flexibility in the plans to avoid any breeding habitat that is
identified. Further, they reiterate the importance of surveys for Marsh Fritillary being
undertaken to inform the planning application, so all the available information is
provided for determination and to inform the mitigation strategy. 
Scottish Water (16/9/25) – advised the ECU they have no objection to this
proposal. In addition, advise that a review of their records indicates that the
proposed development falls partly within a drinking water catchment where a
Scottish Water abstraction is located. Scottish Water abstractions are designated
as Drinking Water Protected Areas (DWPA) under Article 7 of the Water Framework
Directive. Loch Nell supplies Tullich Water Treatment Works (WTW) and it is
essential that water quality and water quantity in the area are protected. Further
note: 
o Two turbines are located within the Loch Nell catchment and a further two
turbines are located within the buffer zone. Although this is likely to be low
risk to the source supply catchment it would always be the preference of
Scottish Water to request that turbines are moved wholly out with the
catchment where possible.
o The fact that this area is located within a drinking water catchment should
be noted in future documentation. 
o Anyone working on site should be made aware of this during site inductions. 
The ECU have asked the applicant to review this response and confirm how they
are planning to address the points raised.   
Ironside Farrar, Peat Landslide Risk Assessment, Stage 1 Checking Report
(PLHRA) (7/03/25) – recommendations in the report requiring a response from the
developer, including: 
Page 36

Page 37

• request for additional peat depth data and survey coverage, 
• consideration of artificial drainage, 
• use of the undrained analysis equation over the drained analysis equation, 
• re-evaluation of consequence assessment, 
• consideration of slide runout in the consequence assessment,
• omission of a fixed link receptor from the risk assessment,
• re-evaluation of risk assessment,
• further assessment of borrow pit areas 
Defence Infrastructure Organisation (DIO) (17/12/2024) – have advised the ECU
they have no objections, subject to conditions relating to Aviation Lighting and
Aviation Charting and Safety Management. 
Defence Infrastructure Organisation (DIO) (6/10/25) – the MOD position remains
that, subject to conditions relating to aviation safety lighting, and charting data being
applied to any consent that might be issued, the MOD has no objection to the
scheme. 
NATS Safeguarding (6/12/24) – have advised the ECU that they have no objection
as the proposals do not conflict with their safeguarding criteria. 
BT Group (17.12.24) – have advised that the proposal should not cause
interference to BT’s current and presently planned radio network. 
BT Group (19.09.25) – Continue to advise that the proposal should not cause
interference to BT’s current and presently planned radio network. 
Joint Radio Company  (dated 2/1/25) – object to the proposed development due
to insufficient information on the name of the development, turbine locations (NGR
values: easting and northing), hub height and rotor diameter for each turbine. 
Joint Radio Company  (dated 29/1/25) – continue to object to the proposed
development, advising that whilst they have undertaken some analysis on this site,
it would need a report from the developer to check the impact of some turbines. 
Joint Radio Company  (dated 31/1/25) – advised that this proposal is now cleared
– subject to 50m Micrositing, and with a caveat of 25m Micrositing on Turbine no. 5
– with respect to radio link infrastructure operated by the local energy networks. 
Joint Radio Company  (dated 10/10/25) – advised that the proposal continues to
be cleared – subject to 50m Micrositing, and with a caveat of 25m Micrositing on
Turbine no. 5 – with respect to radio link infrastructure operated by the local energy
networks. 
Health and Safety Executive (dated 11/12/24) – the development is not within any
explosive licence safeguarding zones and is not within any HSE consultation zones. 
The HSE also has an interest in proposed developments that would have hazardous
substances present at or above threshold quantities [see the Town and Country
Planning (Hazardous Substances) (Scotland) Regulations 2015]. However, this
proposed wind farm and battery energy storage system does not appear to be of
this type. Therefore, HSE's Land Use Planning team have no further comments. 
Page 37

Page 38

Health and Safety Executive (dated 22/09/25) – advised that they have no further
comments to make, further to their original response advising no objections. 
Highlands and Islands Airports Ltd. (undated) – advised that this proposal is out-
with HIAL's safeguarding criteria. Therefore, Highlands and Islands Airports Limited
has no objections to the proposal. 
Oban & The Isles Airports (18/02/25) – advised the ECU that they have been in
engagement with the developer and have nothing further to add to the proposed
development.     
Argyll & Bute Council Consultee Responses 
Consultant Landscape Advisor (1/10/25)  - The Council’s Landscape Consultant
has commented on both the EIAR, as submitted, and on the Further Environmental
Information (FEI) which was submitted in response to cumulative issues relating to
the application stage of the nearby proposed Corr Chnoc wind farm. Cumulative
visualisations produced by the Corr Chnoc wind farm applicant have also been
reviewed where these comprise different viewpoints to those considered in the
Cruach Clenamacrie EIA/FEI due to the close proximity of the two schemes. The
area surrounding the proposed development site and key assessment viewpoints
were also visited in March 2025. 
Landscape Effects 
Significant and adverse effects predicted for: 
• Craggy Upland with Settled Glens (7a) – with effects extending up to
around 6km of the proposed development.
• Lowland Ridges & Moss (18) – Moss of Achnacree.
• Rocky Mosaic (20) – Northern shores of outer Loch Etive. 
While effects on the perceptual characteristics of the High Tops LCT (which covers
the dramatic mountainous landscapes of Argyll lying to the east and north of the
proposed development) would be adverse in some areas, the distance of these
mountains from the wind farm would limit the magnitude of change and, where they
occur to the east, the presence of multiple operational (and consented) wind farm
developments in closer proximity in the Loch Awe/Loch Fyne area would additionally
reduce effects. It is considered that effects on the character of the High Tops LCT
would not be significant. Similarly, the limited extent of visibility of the proposed
development across the visually contained Craggy Coasts and Islands LCT would
not result in overall significant effects on its character. 
Effects on designated landscapes
It is considered that the proposed development would not have significant adverse
effects on the special qualities of the Loch Lomond and Trossachs National Park. 
It is considered that significant adverse effects could arise on views from parts of
the Lynn of Lorn National Scenic Area (NSA), particularly from the open sea in
the southern part of the designated area away from the partial screening provided
by the peninsula of Fionn Ard. This would adversely affect the wider setting to the
NSA although the turbines would not interrupt views towards the Mainland and Mull
mountains which are noted in NatureScot’s description of special qualities. Given
the distance of the proposed development from the designated area, the limited
Page 38

Page 39

visibility likely to occur from the more contained and intimately scaled parts of the
NSA and the focus of the special qualities on the highly scenic linear form of ridges
and islands and islets and their rich vegetation cover, it is considered that the
integrity of this NSA would not be affected. Further, it is not considered that
significant adverse effects would occur on the special qualities of any other NSA. 
There would be relatively limited visibility of the proposed development from the
North West Argyll Coast Local Landscape Area (LLA) which lies to the west of the
development site. While it is considered that there would be adverse and significant
effects on views from Kerrera (represented by Viewpoint 12) and from Viewpoint 11
at Knipoch, it is considered that the qualities that the LLA is likely to have been
designated for would focus on the intricacies of the Argyll coast and islands and
views to Mull, and these would not be significantly affected by the proposed
development, which is located inland from the coast.  
There would also be some visibility of the proposed development from the extensive
North Argyll LLA. Viewpoints 7, 15 and 16 lie within this designated landscape. It
is considered that significant adverse effects would arise on views from
Inveresragan on the north shore of Loch Etive (Viewpoint 7). Adverse but not
significant effects would arise on views from Ben Cruachan (Viewpoint 16) and from
the Strath of Appin area represented by Viewpoint 15. Given the relatively limited
extent of visibility and the likelihood of the reasons for designation of the LLA being
the mountainous scenery and their dramatic juxtaposition with the northern shores
and waters of Loch Etive and the Lynn of Lorn area, it is considered that the integrity
of this designated landscape would be unaffected. 
Visual effects
Significant adverse effects on views would principally occur from: 
• The Glen Lonan area affecting views from Core Paths, National Cycle
Route 78 and from settlement. 
• Roads and settlement east of Oban as represented by Viewpoints 3 from
Barranrioch and Viewpoint 4 from Ardchonnel where the proposed turbines
would form dominant features at distances of between 3.5-4km and would
(particularly in the more open context of Viewpoint 3) contrast with the scale
of the low craggy ridges and small hills characteristic of this area. There
would also be brief but a significant impact on views from the A85 east of
Taynuilt (illustrated by the cumulative visualisation from Viewpoint 9 in the
Corr Chnoc wind farm Additional Information Report). 
• Loch Nell represented by Viewpoint 10 which is located at a popular layby
on its shore. 
• Small hills east of Oban including Viewpoint 9 from the summit of Barran
an Fhraoich (which is shown as a promoted viewpoint on 1:50k OS maps
although does not appear to be frequently accessed) and Pulpit Hill
(Illustrative Wireline I). 
• The shores of outer Loch Etive – represented by Viewpoints 5, 6, 7 and
13 and including views from the grounds of Ardchattan Priory Inventory listed
Garden and Designed Landscape (Cultural Heritage Figure 7.31). 
Page 39

Page 40

• The sea basin between Oban, Mull and Lismore affecting views from
ferries and other watercraft. 
Proposed visible aviation lighting on five of the wind turbines would extend the
duration of significant adverse effects in close-by views from parts of Glen Lonan
and from the settled area between Oban and the proposed development. 
Cumulative landscape and visual effects with other proposed wind farms
With regard to Cumulative Effects, the Council’s Landscape advisor has made the
following comments: 
The proposed development would introduce wind farm development into a new area
where no large wind turbines are present and where the closest operational wind
farms (Beinn Ghlas and Carraig Gheal) have a minimal visual influence. 
The Corr Chnoc, Musdale, Beinn Ghlas Repowering and Barachander proposed
wind farm developments have greatest potential to incur significant adverse
cumulative effects with the proposed development. 
Residential Visual Amenity Effects 
A Residential Visual Amenity Assessment (RVAA) has been undertaken by the
Applicant and is contained in Appendix 6.4. This identifies 5 residential
properties/groups of properties with potential views of the proposed development
lying within 2 km of the nearest turbine. Illustrative wirelines are stated in paragraph
17 of the RVAA as being included in Appendix 6.2. The names of these illustrations
do not always accord with those labelled on Figure 1 of Appendix 6.4. It is assumed
that the wireline titled G Angus’ Garden is the same property as Duntanachan shown
on Figure 1 in Appendix 6.4 but there is no assessment of effects on visual amenity
from this property or on properties at Fearnoch which are also shown on Figure 1
but do not appear in the detailed assessment table on page 3 of the RVAA. There
is nothing to indicate in paragraphs 17 and 18 of the RVAA why these properties
have been omitted and indeed paragraph 18 refers to two further properties located
close to the edge of the study area which are described as having been included in
the assessment. 
The Landscape Consultant cannot come to a view on potential visual amenity
effects on residential properties until clarification on this matter is obtained from the
Applicant. 
Conclusions and recommendations 
The proposed development would result in significant landscape and visual effects
out of proportion to its relatively small size (in terms of numbers of turbines).
Significant adverse effects on landscape character would principally affect the Glen
Lonan area. The proposed development would have significant adverse effects on
views from the minor roads/promoted cycle route and footpaths generally lying
within 5km from the nearest turbine. Views from Loch Nell, from the small hills
surrounding the development site, from parts of the island of Kerrera and from the
northern shores of outer Loch Etive would also be significantly and adversely
affected. Significant combined adverse cumulative effects would occur with the
nearby application-stage Corr Chnoc wind farm on landscape character and on
views. 
The proposed development would be located in a landscape with high sensitivity to
large wind turbines. It would introduce very large infrastructure to a small-medium
scale landscape with distinct scenic qualities.
Page 40

Page 41

Mitigation recommended by the Council’s Landscape Advisor:
A substantial lowering of the height of the proposed turbines would reduce their
dominance in relation to the scale of the landscape and the degree of visual intrusion
experienced from key views. This is likely to necessitate repositioning of turbines
which may in turn resolve the lack of unity of the scheme seen in close views and
present a tighter grouping of turbines which could further help mitigate landscape
and visual effects. 
Clarification is also needed from the Applicant on the RVAA in terms of the
properties assessed (see comment under the Residential Visual Amenity Effects
heading in this report) and the location of the offshore Illustrative Wireline viewpoint
from the Oban-Lismore ferry. 
Applicant response to advice of Council’s Landscape Consultant (15/10/25) 
The applicant has considered the mitigation suggested by the Council’s Landscape
Advisor and responded as follows: 
Significant landscape and visual effects are minimised by the current design and the
request for an amended design to be considered (rather than suggesting that no
wind farm could be accommodated here) accepts that the site is a broadly suitable
location for a wind farm. In this light the request is best understood as a preference
by Ms Anderson for a wind farm that looks smaller and/or nicer and perhaps does
not have lights. Such a preference is understandable when considering a wind farm
in purely aesthetic terms, however many other important factors need to be taken
into account in both wind farm design and planning decision making. 
The two queries relating to the illustrative views from ferries and homes considered
in the RVAA were already answered in the assessments provided and have been
further clarified in this response.
Consultant Landscape Advisor response (4/11/25)
The Council’s Consultant Landscape Advisor has considered the applicant’s
response to the Landscape and Visual Review and responded as follows:
Ferry route - comments noted and map helpful – The Landscape Advisor was not
asked by the Council to comment at Scoping Stage but would certainly have
requested a viewpoint from the ferry route if they had been involved.
RVAA - comments noted although it is considered that there may still be a
discrepancy between the plan drawings (This will be double checked.) 
Paragraph 6: This is incorrect, the reduction of the turbine height is also noted as
providing an opportunity to improve the layout issues as the spacing between
turbines would change.
Paragraph 7 +10: See comments on LVIA above.
Paragraph 8: Dispute that 'numerous' comparisons are made in the Landscape
Advisor’s appraisal to other wind farms. The Corr Cnoc wind farm is of particular
relevance due to its close proximity - it is also useful to compare and contrast siting,
Page 41

Page 42

design and L+V effects between the two developments, given that the Council (and
the Committee) needs to be informed in their decision making. 
Paragraph 13: Dispute that this is a brief view - the road rounds a wide bend at this
point, and views focus on the hills. It is also interesting to note that the Corr Cnoc
wind farm applicant selected this as a representative viewpoint in their LVIA. 
Paragraph 21: NPF4 provides no criteria on what constitutes a localised effect so
the point which seems to be being made is irrelevant.
Paragraph 22: It is acknowledged that some significant adverse L+V effects would
still arise even if the turbines were reduced in size, to say 150m to tip height.
However, the Landscape Consultant doesn't say that there wouldn't be a reduction
in the magnitude of those effects i.e.) reducing from a major to a moderate
magnitude of effect, still significant but resulting in an improved fit with landscape
character and minimising effects on views. Further exploration of mitigation from key
views would need to be undertaken before this could be definitively established. 
Local Biodiversity Officer (29/01/25) – has responded in relation to biodiversity
interest, surveys, outline Habitat Management Plan (oHMP), outline Peat
Management Plan (oPMP), outline Deer Management Plan (oDMP), Bird Protection
Plan (BPP), Species Protection Plan (SPP) and outline Construction Environmental
Management Plan (oCMEP). 
Designated Sites 
Note there will be loss of and impact on ancient woodland where the proposed
access track will be upgraded. Loch Etive Woods SAC and Clais Dhearg SSSI both
lie adjacent to the proposed site boundary, both which could be significantly
impacted upon by the proposed development. I note a Habitats Regulations
Appraisal (HRA) was carried out to determine the Likely Significant Effects (LSE) of
the proposed development on the qualifying features of these designated sites with
the following results: 
• Glen Etive and Glen Fyne SPA – No LSE
• Inner Hebrides and The Minches SAC - no LSE
• Loch Creran SAC - no LSE
• Loch Etive Woods - LSE from the Proposed Development due to changes in
water quality. An Appropriate Assessment shows that there will be no
adverse effect on site integrity through the implementation of a Construction
Environmental Management Plan (CEMP), appointment of an Ecological
Clerk of Works (ECoW) to monitor mitigation measures and habitat
restoration and biodiversity enhancement measures within the designated
sites. 
The Local Biodiversity Officer agrees with the above findings within the HRA and
Appropriate Assessment. It should be noted that Clais Dhearg SSSI lies within Loch
Etive Woods SSSI and therefore the same results apply. It is also noted that the
applicant is in talks with NatureScot regarding potential restoration projects within
Loch Etive SAC and Clais Dhearg SSSI as part of their offsite biodiversity
enhancement measures. 
Habitat (Predicted Losses and Impact) 
Page 42

Page 43

High Value Habitats (EU Habitats Directive Annex 1)
• F1a Blanket Bog (M19/M25) – 8.74ha (6.52%) – significant impact
• H1b Upland Heathland – 1.79ha (3.09%) – not significant impact
• H1b5 Dry Heaths: Uplands – 0.85ha (18.72%) – not significant impact
• H1b6 Wet Heathland with Cross Leaved Heath; Upland – 1.09ha (5.56%) –
not significant impact
• W1e Upland Birchwood – 2.27ha (7.31%) - not significant impact 
Medium Value Habitat (Scottish Biodiversity List priority habitat)
• F2b Purple Moor Grass and Rush Pastures – 3.87ha (9.92%) – not
significant impact
• H2a Native Hedgerow – 0.01km (3.57%) – not significant impact
• W1a Upland Oakwood – 0.04ha (4.08%) – not significant impact
• W1d Wet Woodland – 0.02ha (0.11%) – not significant impact 
• W1g Other Broadleaved Woodland – 0.017ha (3.27%) - not significant
impact 
The Local Biodiversity Officer notes that the predicted loss and impact of 7.8ha of
Blanket Bog will result in a significant impact from the Proposed Development.
However, with the provision of the outline Habitat Management Plan (oHMP) and
proposed enhancement of 57ha on site and 30-40ha offsite, the residual effects will
not be significant. It is also noted that the applicant is in talks with NatureScot
regarding the proposed onsite and offsite biodiversity enhancement measures
within the oHMP which is welcomed. 
Peatland 
The Local Biodiversity Officer notes that the applicant has been in discussion with
NatureScot and SEPA and welcomes the suggested relocation of turbines to ensure
deep peat is avoided. 
The inclusion of an outline Peat Management Plan with appropriate mitigation
measures is also welcomed. It is recommended the applicant continue discussions
with NatureScot and SEPA to ensure best practice for peat extraction and
restoration. 
European Protected Species 
Bats
The Local Biodiversity Officer welcomes the proposed mitigation measures,
including pre-works surveys to be carried out by a qualified bat ecologist and the
production of a Species Protection Plan (SPP). Further, while the impact to bats is
unlikely to be significant, it would be advisable to monitor any fatalities that may
occur from collision as they are found to forage within the wind turbine areas. This
information will feed into mitigation measures which can be altered accordingly to
ensure any negative impacts to foraging / commuting bats is minimal. 
Otter
Note there is suitable habitat for resting, foraging and commuting present along
watercourses within and around the site. 
Red Squirrel
Note there is suitable habitat present. 
Page 43

Page 44

Fish
Note that Atlantic salmon and brown trout were recorded
Suitable habitat is also present for Fresh Water Pearl Mussel (Margaritifera
margaritifera), though none were recorded.
Mitigation measures will ensure no significant effects on fish species.
It is welcomed that proposed mitigation measures include sensitively timed works
to avoid the brown trout spawning season (October to April inclusive), production of
an SPP and post works monitoring. 
Wood Ants
Proposed mitigation measures are welcomed, including pre-works surveys during
their active season (March to October), application of buffers where necessary,
translocation if necessary (following expert advice) and post translocation / works
monitoring. 
No evidence was recorded, but suitable habitat is present in and around the site for
the following species: Amphibians, Badger (Meles meles), Brown Hare (Lepus
europaeus), Hedgehog (Erinaceus europaeus), Marsh Fritillary (Euphydryas
aurinia), Mountain Hare (Lepus timidus), Pine Marten (Martes martes), Reptiles,
Water Vole (Arvicola amphibious), Wildcat (Felis silvestris silvestris), 
No evidence or suitable habitat recorded on site for Great Crested Newts (Triturus
cristatus) 
Ornithology
No likely significant impact of residual impacts on any bird species, with proposed
mitigations outlined in the Bird Protection Plan (BPP) and oHMP in place. In
addition, it is noted that the applicant is in discussions with NatureScot and RSPB
regarding the potential impact and appropriate mitigation measures for Golden
Eagle (Aquila chrysaetos), Hen Harrier (Circus cyaneus) and Black Grouse (Tetrao
tetrix). 
The proposed mitigation and enhancement measures to include pre-works surveys
by a qualified ecologist, sensitive timing of works, appropriate buffer zones where
necessary, no works to be carried out if nests within buffer zones are occupied, post-
works monitoring programme and on and offsite enhancement measures are
welcomed. 
Outline Habitat Management Plan 
The following aims and objectives of the oHMP are welcomed:
• To improve the condition of modified peatland communities within the site
through:
- a programme of drain blocking
- Sitka spruce removal
- peat bund installation
- purple-moor grass reduction
- reintroduction of Sphagnum
• To improve the condition of offsite northern emerald habitat through:
- halting run-off to prevent drying out
- removing bog myrtle
• To improve the condition of offsite marsh fritillary habitat through:
- targeted bog myrtle removal
- maintain devil’s-bit scabious through controlling grazing pressures
Page 44

Page 45

- removal of Rhododendron ponticum
• To control deer numbers to improve condition of designated woodland,
ensure protection of onsite peatland restoration areas and maintain
woodland regeneration to supporting breeding hen harrier 
In addition, note that the applicant is in discussion with NatureScot regarding the on
and offsite habitat enhancement measures. The continuation of these discussions
is encouraged, to gain expert advice in the different aspects of enhancement and
management. The implementation of a Steering Group and a programme of
monitoring for the duration of the life of the proposed development is also welcomed. 
outline Construction Environmental Management Plan (oCEMP) 
Welcome the proposed appointment of an ECoW, provision of Toolbox Talks to all
site staff and best practice guidelines, to be adhered to throughout the lifetime of the
proposed development. 
Bird Protection Plan (BPP) 
Welcome the inclusion of:
• Appointment of ECoW 
• Pre-works surveys
• Nest checks and appropriate buffer zones where necessary
• Ensure compliance with the proposed mitigations 
Deer Management Plan (DMP) 
Note the applicant is in discussions with NatureScot and neighbouring landowners
regarding a newly defined Cruach Deer Management Plan to include:
• Herbivore Impact Assessment surveys
• Habitat condition monitoring
• Creation of a stalker role
• Appropriate mitigation measures to ensure deer welfare at all times
• Programme of deer culling to ensure deer numbers are at a state where they
complement the habitat rather than negatively impact upon it due to high
grazing pressure from high population 
In addition, note deer fences are proposed to allow habitat restoration and
regeneration, to such a time the trees and shrubs are established. Recommend that
due to the presence of black grouse in the area, the applicant should ensure the
fences are clearly marked and a programme of monitoring fences for any potential
black grouse carcasses is implemented. 
Local Biodiversity Officer (22/09/25) – has confirmed that she is satisfied with the
submitted proposals but also ask that the applicant continues discussions with
relevant organisations to ensure appropriate mitigation and enhancement measures
are adhered to, and potential impacts are minimal. 
Noise Consultant (14/03/25) – advise that the desktop review and site survey
conclude that, in general, good practice has been adopted by the applicant, with a
few minor issues identified. The most significant of these issues are: 
• The consideration of cumulative operational noise impacts concludes that
there are no risks but the basis of this is not presented. A review of
Page 45

Page 46

cumulative impacts with the existing Bein Ghlas wind farm (operational) and
Corr Cnoch wind farm (in planning) shows that there is potential for the 35
dB LA90 limit to be exceeded.
• The noise emission data for the turbines assumes the benefit of trailing edge
serrations but this is not specifically mentioned in the project description.
This can provide benefits of up to ~3 dB in the turbine sound power level and
therefore results in a potentially significant under-estimation of noise
impacts.
• The consideration of topographical screening is based on the visibility of the
turbine whereas it should be the top of the turbine rotor. Given that the
closest separation distance between receptors and turbines is ~1,330m, this
is not considered to be a significant issue.
• There are two noise sensitive receptors labelled ‘NSR2’ and two labelled
‘NSR3’ (6km apart):
– NSR2
○ Sealladh Mhor (196,315, 732,200) in Chapter 8 Table 8.5 but is given as
NSR1 in Chapter 8 Table 8.6
○ Duntanachan (196,706, 728245) in Chapter 8 Table 8.6 
– NSR3
○ Eltham Cottages (198,145, 732,385) in Chapter 8 Table 8.5
○ Clachadubh (194,753, 727,382) in Chapter 8 Table 8.6 
• Confirmation is sought that there are no derelict properties with residential
planning status in the study area.
• Confirmation is sought that the correction of predicted LAeq values to give
LA90 values by subtracting 2 dB. 
Following a satisfactory response to the above issues from the Applicant, it is
considered that there would be no reasons to object to the scheme on noise
grounds. A suitably worded condition such as that included in Section 4 of this report
to limit the noise levels, tonality and amplitude modulation should be applied to
control noise levels from the proposed scheme. 
Noise consultant (email dated 17.09.2025) - confirm that they have reviewed the
Greencat Renewables description of their derivation of apportioned noise limits for
their wind farm and Corr Chnoc. 
This was found to be compliant with the cumulative limit, therefore the predicted
impact plus 2dB at all wind speeds is taken as the apportioned limit. In summary,
the developer has provided a satisfactory response to the various queries, and
therefore the noise consultant’s final recommendation is that the original conclusion
of their assessment of the applicant’s noise assessment stands. 
Area Roads – at the time of writing no response has been received.
Planning Officer comments:
The proposal site is proposed to be accessed directly from the A85 Trunk Road,
with no resultant access implications anticipated for the local road network. As
stated above Transport Scotland have responded to the ECU consultation request,
advising no objections to the proposals, subject to the attachment of relevant
conditions to any approval. 
Flood Risk Assessor (24/12/24) – no objection, subject to conditions.  Conditions
recommended:
Page 46

Page 47

1. Any proposed watercourse crossings that are added or upgraded should be
designed to convey the 1 in 200 year plus climate change (46% allowance) flood
event. 
2. Surface water drainage should be designed in accordance with CIRIA C753 and
ensure that post development surface water runoff does not exceed the pre-
development surface water runoff. The surface water drainage should be in
operation prior to the start of construction. 
Flood Risk Assessor (2/10/25) – continue to advise no objection, subject to the
conditions recommended in their original response. 
Access Officer – at the time of writing no response has been received. 
Environmental Health (18/12/24) – advise that they are unable to review the
application and recommend that Planning consider employing a noise consultant to
assess the effects that may arise. 
West of Scotland Archaeology (WoSAS) – at the time of writing no response has
been received. 
Please note: the above are summaries and the full consultee responses can be
viewed on the Energy Consent Unit and Argyll & Bute Council websites. 
(D) HISTORY:   
24/00069/PP - Erection of a meteorological mast up to 120m in height for a
temporary period of 5 years.  Approved 11/04/24 
(E)       PUBLICITY:   
As the Council is not the Determining Authority the ECU oversees the Publicity of
the application. 
Public Consultation – Whilst not a statutory requirement for Section 36
applications, the applicant has chosen to undertake Public Consultation. Further
information on this is contained in the Cruach Clenamacrie Wind Farm Pre-
Application Consultation Report (November 2024), available on the ECU website
(reference: ECU00004841). 
(F) REPRESENTATIONS:   
As the Council is not the determining authority any letters of representation are
considered by the Energy Consents Unit. At time of writing, 40 objections, 17
representations in support and 2 comments letters have been received by the ECU.
The key issues raised are summarised below: 
Summary of Objections received
Page 47

Page 48

Landscape and Visual Impact 
• The proposed 200m tall turbines will significantly adversely alter the visual character
of the area, representing industrialisation of the countryside.
• To erect these six wind turbines in front of Ben Cruachan would be extremely
detrimental to visual landscape.
• The windfarm would be visible from the whole area of the Lynn of Lorn National
Scenic Area. It will be visible from Lismore, Kerrera, from ferries to Mull and the
Outer Hebrides (Tiree, Coll, Barra), Connel, North Connel, Ardchattan and the Oban
to Connel back road.
• Adverse cumulative impacts with other nearby existing and proposed wind farms.
• Incompatible with the area's natural beauty and panoramic designation.
• The proposed development is disproportionately large for the local landscape and
situated too close to residential properties. 
Planning Policy 
• Contrary to the Argyll & Bute Local Development Plan (LDP2)
• Contrary to National Planning Framework 4 (NPF4) 
• Contrary to the Argyll & Bute Landscape Wind Energy Capacity Study (2017)
• Does the site abide with the Electricity Act 1898?
• The site is in a landscape character type deemed unsuitable for turbines of 200m.
• Preference for Scotland should be hydro pumped storage energy.
• Conflicts with National Scenic Area (NSA) protections 
Tourism and Economic Impact 
• Detrimental impact on the local tourism economy.
• Turbines would be visible from estate walking and cycling routes, potentially
affecting visitor experience and bookings.
• The development will have a detrimental impact on local tourism, including on B&B
and accommodation providers.
• Minimal long-term job creation.
• Economic benefits may not reach the local community.
• Financial incentives seen as inadequate compensation.
• Limited long-term local economic benefits; most jobs expected to be temporary.
• Inadequate community consultation and Cybersecurity concerns over foreign
ownership/operation and management. 
Natural Heritage / Biodiversity Issues  
• Significant loss of habitat and biodiversity
• Increased flood and river pollution/contamination risk.
• Site is very close to 3 SSSI’s and a Special Area of Conservation.
• Environmental Impact Assessment lacks site-specific detail.
• The site is home to rare and protected species: golden eagles, sea eagles,
buzzards, hen harriers, marsh fritillaries, bats, owls, badgers, pine martens, otters
and wild deer.
• The area includes peatland, which is sensitive and important for carbon
sequestration.
Page 48

Page 49

• The loss of rich peatland habitat and the amount of carbon that would be released
during the commissioning phase where over 40,000 cubic metres of peat rich habitat
will be destroyed, is not justified.
• Flora and Fauna will be severely impacted.
• Fisheries have raised concerns about the local rivers.
• Loss of existing woodland. 
Cultural Heritage 
• Potential harm to archaeological sites and sites of historical significance.
• Proximity to heritage sites like standing stones and the “Road of the Kings.” 
Infrastructure 
• Lack of clarity on associated transmission lines and infrastructure. 
• Significant construction and grid connection requirements.
• Risk of disruption to local roads and transport, which will need to be upgraded.
• Possible disruption/interference to telecommunications.
• Risks to aviation safety, including proximity to Oban Airport.
• The inclusion of a BESS facility adds further environmental and construction
concerns.
• Pressure on local infrastructure during construction.
• Objections to separate access roads for nearby wind farms, which could maximize
land damage.
• Traffic pressure on single-track roads during construction. 
Amenity 
• Concerns over noise, nuisance, and degradation of local amenity for current and
future generations, including adverse impacts on resident’s general and mental
health.
• Shadow flicker during the day and turbine lighting at night could affect nearby homes
and wildlife.
• Safety concerns regarding the proposed battery energy storage system, including
fire and toxic emissions, and access to the site for the fire and emergency service.
• Concerns about health, including stress related illnesses, sleep disturbance, loss of
tranquillity.
• The RVAA zone should be increased to at least 5 km to include all the nearby
settlements.
• Adverse visual impacts from the many rural dwellings in this area, and from vessels
in the Firth of Lorn, including ferries and sailing yachts. 
• Adverse impacts on existing “Dark Skies”, due to proposed aviation warning lights. 
Precedent 
• Fears the approval could set a precedent for similar developments in inappropriate
locations. 
Sustainability of Wind Farms 
• Questions the overall sustainability of wind farms due to high energy and resource
demands during construction and decommissioning.
• Carbon footprint of construction and turbine disposal.
Page 49

Page 50

• Short operational lifespan may not justify long-term damage.
• Concerns over reliance on desktop studies.
• No safe way to recycle turbine blades. 
Community Benefit 
• Contend that there is no tangible benefit to the local community or economy.
• Devaluation of nearby properties and land. 
Lack of Justifiable Need 
• North Argyll already exceeds renewable energy targets.
• Other projects (e.g., Cruachan 2, Beinn Ghlas Repower) offer greater capacity with
less impact. 
Other 
• Recent seismic activity raises safety concerns. 
• Contend that there is no tangible benefit to the local community or economy.
• Potential devaluation of nearby properties. 
• Is there capacity for grid connections for all the projects proposed? 
• Negative effects on agriculture.
• Limited consultation with local residents.
• Bladeless wind, tidal turbines and hydro schemes should be installed.
• A Public Inquiry is warranted for the proposals.
• Electricity cannot be effectively stored, and wind power is inconsistent.   
Summary of Support received 
Climate Change Mitigation 
• Urgent need to reduce atmospheric CO₂, and to de-carbonise both industry and
energy production.
• There is a need for more renewable energy with Global warming continuing to
increase.
• Renewable energy is essential to avoid severe national costs from climate-related
hazards (e.g. flooding, droughts, storms).
• The site will contain a battery storage unit thus prolonging the production of
electricity.
• The site has a high capacity wind resource and is expected to produce electricity for
50 years.
• Scotland has been and remains a leader in renewable energy (wind and hydro) and
the jobs created in assembling, installing, and maintaining our wind farms are key
for local contractors. 
Minimal Tourism Impact 
• Site is remote, not a tourist hotspot.
• Turbines likely not visible from major tourist routes or from Oban. 
Visual Amenity Considerations 
Page 50

Page 51

• Consideration of the proposals with the nearby Corr Chnoc Wind Farm (pending
approval) will require a need to balance local amenity loss with national renewable
energy needs.
• Proposed site is suitable, is relatively small in scale and has very little environmental
or visual impact. 
• Site is not sensitive or designated and has a good existing access.
• Beinn Ghlas Wind Farm is nearby, suggesting visual impact is already present. 
Economic Benefits 
• Potential for energy export to the UK.
• Wind farms reduce dependence on imported energy and would be a great asset.
• Positive impact on Scotland’s balance of payments.
• Economic and employment benefits for local businesses and contractors.
• The wind farm will require a wide range of services, including: 
• Construction, Assembling, installation and maintaining wind farm.
• Job creation for local employees and contractors.
• Renewable energy projects are seen as making a significant contribution to both the
local and Scottish economy and will bring substantial financial benefits to a fragile
rural community. 
Community Wealth Fund Proposal 
• Suggests establishing a fund to benefit local communities and initiatives.
• This Community Wealth fund is expected to significantly benefit the Argyll and Bute
economy and leave a lasting local legacy.
• Wind farms in Scotland have contributed millions annually to community projects,
directly improving the quality of life for local residents. 
Summary of comments representations received 
Impacts to the Mid Argyll Important Invertebrate Area 
• Part of the Mid-Argyll Important Invertebrate Area (IIA) is directly adjacent to the
northern border of the application site. IIAs are nationally or internationally
significant places for the conservation of invertebrates and the habitats upon which
they rely.
• Much of this area of the IIA overlaps with Clais Dhearg Site of Special Scientific
Interest (SSSI) designated partly for its dragonfly assemblage and population of the
Vulnerable Marsh Fritillary Butterfly (Euphydryas aurinia). Buglife would also
highlight that the Black Lochs within the SSSI support a population of the Near
Threatened Medicinal Leech (Hirudo medicinalis), one of only three locations in
Scotland for this species. 
Water quality impacts 
• There are hydrological links between the application site and Clais Dhearg SSSI
with multiple small watercourses from the site flowing into the SSSI. Therefore, there
is a route for pollutants and sediment to run off the site during the
construction/decommissioning phases and through maintenance works during the
operational phase.
• Any pollutants within the watercourses would adversely impact the aquatic habitats
of both Medicinal Leech, dragonflies and other aquatic invertebrates. It is vital that
a comprehensive Construction and Environmental Management Plan (CEMP) and
Page 51

Page 52

Pollution Prevention Plan (PPP) is developed that will ensure there will be no
impacts to the water quality of the wetland habitats within the SSSI. 
Impacts to Marsh Fritillary Populations 
• The Ecology Report indicates there is limited suitable habitat on site for Marsh
Fritillary, with only occasional presence of its sole foodplant, Devils-bit Scabious
(Succisa pratensis), and no know records for this species on site. However, the
absence of records does not confirm the absence of a species unless the site has
been well studied.
• It is concerning that appropriate surveys to confirm if Marsh Fritillary are present
within impacted areas are only to be undertaken before construction and not being
used to avoid impacts. Determining the likely presence and impacts to this protected
species is a material consideration in a planning application and therefore this
information should be available prior to a decision being made.
• Volunteers from Butterfly Conservation Scotland visited in June 2024 and recorded
Marsh Fritillary adults (with evidence) at a number of locations within the proposed
site boundary. Numbers were sufficient to indicate that on site breeding is taking
place.
• Translocations are inherently risky and should be avoided if at all possible.
• It is likely that the construction of the wind farm, battery storage facility and
associated infrastructure will cause the loss of suitable Marsh Fritillary habitat. This
is acknowledged in the application documentation.
• Should the proposed development proceed, we would urge that all reasonable
mitigation measures are followed, and that suitable breeding habitat is identified
prior to construction beginning and habitat loss avoided wherever possible.
• We would also wish to see the full implementation of the proposed off-site
enhancement scheme for Marsh Fritillary to ensure that any habitat loss on site is
appropriately accounted for. This off-site scheme should be a long-term commitment
for the lifespan of the windfarm and include an appropriately funded monitoring and
maintenance programme to ensure the improved habitat remains in good condition. 
Wood Ants and Shining Guest Ant 
• Buglife welcomes that targeted surveys were undertaken on wood ant nests
(Formica aquilonia and Formica lugubris) and that a precautionary approach to the
presence of Shining Guest Ant (Formicoxenus nitidulus), a Scottish Biodiversity List
species 3, has been taken.
• Buglife supports the recommendation that wherever possible, any wood ant nest
should be avoided with a minimum 20m buffer and that any necessary
translocations of nests will follow best practice, as detailed in a Species Protection
Plan. 
Outline Habitat Management Plan 
• Buglife welcome measures to improve habitat for the Near Threatened Northern
Emerald Dragonfly (Somatochlora arctica) and Marsh Fritillary as part of
compensation measures for the impact of this development.
• It is important that a dragonfly expert has been consulted to inform these proposals
and Buglife would also recommend consulting the British Dragonfly Society with
regard to this species.
• These proposals are in a sensitive location close to several designated sites with
vulnerable aquatic habitats supporting rare invertebrates. Therefore, Buglife would
Page 52

Page 53

reiterate that the provision of pollution and sediment control measures should be
provided before determination. 
Note: The comments raised above are addressed in the assessment of the
proposal at Appendix A of this report. 
Note: Please note that the letters of representation above have been
summarised and that the full letters of representation are available on the
Energy Consents Units website. 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report (EIAR): 
EIAR (November 2024) presented in three volumes:   
• Volume 1 : EIA Written Statement
• Volume 2 : Figures
• Volume 3 : Appendices 
Key topics covered in the EIAR include; Introduction;
Planning and Renewable Energy Policy; EIA
Methodology; Assessment of Alternatives; Project
Description; Landscape and Visual; Cultural Heritage and
Archaeology; Noise; Geology, Hydrogeology, Hydrology
and Soils; Ecology; Ornithology; Transport and Access;
Forestry; Aviation and Radar; Shadow Flicker;
Telecommunications and Infrastructure; Climate Change
and Carbon Balance; Summary of Mitigation.   
In addition, the following documents are also
provided in support of the application: 
• EIAR Non-Technical Summary;
• Planning and Renewable Energy Statement;
• Pre-Application Consultation Report. 
Yes
(ii) An Appropriate Assessment under the Conservation
(Natural Habitats) Regulations 1994:   
NatureScot will
advise the
ECU  
(iii) A Design or Design/Access statement:    Yes  
(iv) Sustainability Checklists (with reference to the
requirements of LDP2 Policy 04): 
Not required
as proposal
accompanied
by full EIAR.
Page 53

Page 54

(v) A report on the impact of the proposal e.g. Retail
impact, transport impact, noise impact, flood risk,
drainage impact etc:  
All relevant
reports are
encompassed
within the
EIAR   
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:  No 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  No    
(J) Section 25 of the Act; Development Plan and any other material
considerations over and above those listed above which have been
considered in the assessment of the application 
(i) List of all Development Plan Policy considerations considered in assessment
of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaptation
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 5 – Soils
NPF4 Policy 6 – Forestry, Woodland, and Trees
NPF4 Policy 7 – Historic Assets and Places
NPF4 Policy 11 – Energy
NPF4 Policy 22 – Flood Risk and Water Management
NPF4 Policy 33 – Minerals 
Annex B – National Statements of Need 
3. Strategic Renewable Electricity Generation and Transmission Infrastructure 
Argyll & Bute Local Development Plan 2 (Adopted 2024) 
Policy 02 – Outwith Settlement Areas
Policy 04 – Sustainable Development
Policy 15 – Protection, Conservation and Enhancement of Our Historic Environment
Policy 16 – Listed Buildings 
Policy 19 – Scheduled Monuments
Policy 20 – Gardens and Designed Landscapes
Policy 21 – Sites of Archaeological Importance
Policy 30 – The Sustainable Growth of Renewables
Policy 31 – Minerals 
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
Policy 43 – Safeguarding of Aerodromes
Page 54

Page 55

Policy 55 – Flooding
Policy 56 – Land Erosion
Policy 57 – Risk Appraisals
Policy 58 – Private Water Supplies and Water Conservation
Policy 59 – Water Quality and the Environment
Policy 60 – Private Sewage Treatment Plants and Wastewater Drainage Systems
Policy 61 – Sustainable Drainage Systems (SuDS)
Policy 62 – Drainage Impact Assessments
Policy 63 – Waste Related Development and Waste Management
Policy 70 – Development Impact on National Scenic Areas (NSA’s)
Policy 71 – Development Impact on Local Landscape Areas (LLA’s)
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 74 – Development Impact on Sites of International Importance
Policy 77 – Forestry, Woodland, and Trees
Policy 78 – Woodland Removal
Policy 79 – Protection of Soil and Peat Resources 
• List of all other relevant planning considerations considered in the
assessment of the application, having due regard to Annex A of Circular
3/2013. 
• Scottish Energy Strategy (2017)
• Onshore Wind Policy Statement (2022)
• Draft Energy Strategy and Just Transition Plan (2023)
• Good Practice Principles for Shared Ownership of Renewable Energy
Developments, Scottish Government, 2019
• Onshore Wind Turbines: Planning Advice, Scottish Government (May 2014)
• The Argyll & Bute Landscape Wind Energy Capacity Study, 2017 (LWECS)
• ABC Technical Note – Biodiversity (Feb 2017)
• Landscape Institute and Institute of Environmental Management and
Assessment – Guidelines for Landscape and Visual Impact Assessment, Third
Edition (2013)
• Scottish Natural Heritage – Visual Representation of Wind Farms Guidance
(Version 2.2, 2017)
• Scottish Natural Heritage - Siting and Designing Wind Farms in the Landscape
Guidance (Version 3a, 2017)
• Historic Environment Policy for Scotland (2019)
• Scottish Government, Draft Planning Guidance: Biodiversity, 2023
• The Climate Change (Emissions Reduction Targets) (Scotland) Act 2024
• Managing Change in the Historic Environment
• PAN 1/2011: ‘Planning and Noise’ (March 2011)
• Scottish Government’s Policy on ‘Control of Woodland Removal’ (Forestry
Commission Scotland 2009)
• UK Forestry Standard (UKFS)
• PAN 60 – Planning for Natural Heritage (Jan 2008)
• Views of statutory and other consultees
• Planning history of the site
• Legitimate public concern or support expressed on relevant planning matters. 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment: No - Environmental Impact Assessment was required. 
Page 55

Page 56

(L) Has the application been the subject of statutory pre-application consultation
(PAC):  No - PAC is not required for S36 applications. 
(M) Does the Council have an interest in the site: No 
(N) Requirement for a pre-determination hearing: No 
(O) Is the proposal consistent with the Development Plan: No. 
(P) Need for notification to Scottish Ministers or Historic Environment Scotland:
No 
Author of Report: Stuart W Ramsay                       Date: 31/10/25 
Reviewing Officer: Sandra Davies                        Date: 06/01/26   
Fergus Murray
Head of Development & Economic Growth 
Page 56

Page 57

COMMITTEE REPORT
APPENDIX A – RELATIVE TO APPLICATION NUMBER:  24/02242/S36 
PLANNING LAND USE AND POLICY ASSESSMENT 
PLANNING LAND USE AND POLICY ASSESSMENT   
1. THE SECTION 36 CONSENTING REGIME  
1.1 In Scotland, any application for an onshore power generating station with an
installed capacity of over 50 megawatts (MW) requires the consent of Scottish
Ministers under Section 36 of the Electricity Act 1989.  Any authorisation given
includes a deemed planning permission. Consequently, there is no need for a
planning application to be made to the Council.  The Council’s role in this
process is one of a consultee.  
1.2 The Development Plan is not the starting point for considering S36 applications. 
The reason for this is that the sections of the Planning Act which establish the
primacy of Development Plan Policy in decision making are not engaged.  NPF4
and LDP2 now form the Development Plan.  Whilst they do not have primacy in
S36 decision making, they remain an important consideration to inform the
Council’s consultation response.  
1.3 Schedule 9 of the Electricity Act requires the applicant and the decision maker
to have regard to the preservation of amenity.  It requires that in the formulation
of proposals the developer shall have regard to: 
(a) the desirability of preserving natural beauty, of conserving flora, fauna and
geological or physiological features of special interest and of protecting sites,
buildings and objects of architectural, historical or archaeological interest; and 
(b) shall do what he reasonably can to mitigate any effect which the proposals
would have on the natural beauty of the countryside or on any such flora, fauna,
features, sites, buildings, or objects.  
1.4 It obliges the Scottish Ministers as decision maker to have regard to the
desirability of the matters at (a) and the extent to which the applicant has
complied with the duty at (b).  
1.5 Assessment of the proposal against the policies of NPF4 and LDP2 will ensure
that proper consideration is given by the Council to the extent that the proposal
satisfies these Schedule 9 duties.  
1.6 The Council can either support or object and recommend conditions to be
imposed if consent is granted by Scottish Ministers.  If an objection is raised by
the Council, Scottish Ministers are obliged to hold a Public Local Inquiry (PLI) if
they are minded to grant consent.  They can also choose to hold a PLI in other
circumstances at their own discretion.  Any Inquiry would be conducted by a
Reporter appointed by the Directorate for Planning and Environmental Appeals. 
If consent is granted the Council as Planning Authority is responsible for the
agreement of matters pursuant to conditions, ongoing monitoring and
enforcement.
Page 57

Page 58

1.7 This report considers the relevant policy considerations, planning merits, views
of consultees and representations.  It recommends views to be conveyed to the
Energy Consents Unit (ECU) for consideration before a decision is made.  
2. SPATIAL AND SETTLEMENT STRATEGY  
2.1 Policy 02 – Outwith Settlement Areas establishes acceptable scales of
development in three different zones.  The main wind farm site is located with
Remote Countryside Area, which only supports specific categories of
development.  This includes renewable energy related development.  In
principle, Policy 02 supports renewable energy and ancillary development in
these areas, providing they are consistent with all other relevant LDP2 Policies. 
With respect to the requirement for developments to accord with all other
relevant policies, particular attention is drawn to Policies 70 to 76 with respect to
landscape and the natural environment.  Proposals must also demonstrate that
there will be no unacceptable adverse effects (individual or cumulative) on
natural heritage, built and/or cultural heritage, and landscape and visual
amenity.  
2.2 Policy 04 – Sustainable Development requires that in preparing new proposals
developers should demonstrate the following sustainable development
principles (where relevant) such as: maximise the opportunity for local
community benefit; support existing communities and maximise the use of
existing infrastructure and services; conserve and enhance the natural and built
environment and avoid significant adverse impacts on biodiversity, natural and
heritage assets; respect the landscape character of an area and the setting and
character of settlements; avoid places with significant risk of flooding, or ground
instability and avoid having significant adverse impacts on land, air and water
environment.  This application is supported by an Environmental Impact
Assessment Report (EIAR) which sets out in detail the measures proposed to
seek to ensure the proposal is considered as ‘Sustainable Development’.  
2.3 Policy 11 – Energy of NPF4 and Policy 30 – Sustainable Growth of Renewables
LDP2 provide the primary policy framework for assessing renewable energy
proposals.  In this case, following a detailed assessment, and taking into account
the findings of the Landscape and Visual Review carried out by the Council’s
Consultant Landscape Architect it is considered that the landscape & visual
impact of the proposal is unacceptable. It is concluded that the proposal is not
in compliance with development plan policy relating to the spatial and settlement
strategy, which requires proposals to be consistent with all relevant policies.  
2.4 For the reasons detailed further below in this report, it is considered that this
proposal would be contrary to Development Plan Policy, and associated
guidance, in respect of renewable energy development in Argyll & Bute.  
2.5 Having due regard to the above and following consideration of the conclusions
and recommendations of the Council’s Consultant Landscape Architect, it is
considered that approval of this proposal would be contrary to the provisions of
NPF4 Policy 11, LDP 2 Policy 02 – Outwith Settlement Areas and LDP Policy
04 – Sustainable Development.  
Page 58

Page 59

3. ENERGY & SUPPORTING THE SUSTAINABLE GROWTH OF
RENEWABLES  
3.1 Argyll & Bute Council is keen to ensure that Argyll & Bute continues to make a
positive contribution to meeting the Scottish Government’s targets for renewable
energy generation.  These targets are important given the compelling need to
reduce our carbon footprint and reduce our reliance on fossil fuels, reinforced by
the Climate Change (Emissions Reduction Targets) (Scotland) Act 2019.  The
Council will support renewable energy developments where these are consistent
with the principles of sustainable development, and it can be adequately
demonstrated that there would be no unacceptable significant adverse effects.  
3.2 This proposal has been assessed primarily against the two lead Statutory
Development Plan policies relating to renewable energy, Policy 11 – Energy of
NPF4 and Policy 30 – the Sustainable Growth of Renewables of LDP2.  Other
policies are referred to where relevant.  
4. LOCATION, NATURE, AND DESIGN OF PROPOSAL  
4.1 The proposed site covers an area of approx. 310 ha (including the vehicular
access), is bounded by Fearnoch Forest to the south, east and west, and is
located approximately 7km east of Oban and 5 km west of Taynuilt. The
proposed development would be operational for up to 50 years and would
thereafter be decommissioned.  
4.2 The site can be considered to be in 2 distinct parts, namely the main wind farm
site itself, where the wind turbines and associated infrastructure would be
located, and the long, narrow, vehicular site access from the A85 Trunk Road
through Fearnoch Forest. The landscape within the site is characterised as
craggy upland with oak-birch woodland, rounded knolls, rocky outcrops and
numerous lochs in low-lying hollows and glens. The elevation of the wind farm
site ranges from approximately 160 metres AOD in the north east to 273 metres
AOD in the west. There are several prominent hilltops within and surrounding
the site, including Cruach Clenamacrie (273m AOD). Deadh Choimhead (383m
AOD) is located close to the southern edge of the site.  
4.3 The proposed vehicular site access would extend from a new access point
formed on the A85 at 20 metres AOD to the north east of the site and would then
climb through the forest via new and existing access tracks to the entrance of
the main site at approximately 180 metres AOD. No public roads are located
within the site.  
4.4 A number of small watercourses traverse the site, including the Lusragan Burn
and the Black Loch's tributaries.  Additionally, several small lochans can be
found within and surrounding the site.  
4.5 To the south of the proposed Wind Farm site, there is an on-road Core Path
linking the A85 to the east / northeast with National Cycle Route 78 to the west,
Core Path C160, which runs along the C32 Oban-Glenlonan-Taynuilt Road.  
4.6 There are no Scheduled Monuments or Listed Buildings within the Site.
Glenamachrie Cairn and An Dun, dun and Glenamachrie Standing Stone are
the closest Scheduled Monuments located approximately 0.8km south-west of
Page 59

Page 60

the Site. The closest Listed Building is the Category B Achnacloich House which
is located approximately 2.3km to the north-west of the access track.  
4.7 Directly north of the Site lies an area of the Loch Etive Woods Special Areas of
Conservation (SAC) which is located within the Clais Dhearg Site of Special
Scientific Interest (SSSI). In addition, there are areas of Ancient Woodland
Inventory located within the Fearnoch Forest portion of the Site along the access
track.  
4.8 The closest settlement is Fearnoch, located approximately 2.3km to the north-
east of the nearest turbine. There are several dispersed residential properties
surrounding the site, with Glenamachrie being the nearest residential property,
located approximately 1.3km south-west of the closest turbine.  
4.9 Proposed Development – the main components are: 
• Six, three-bladed horizontal axis wind turbines, up to 200m in tip height
and a generating capacity of approximately 7.2MW each; 
• 20MW Battery energy storage system (BESS) containers located
adjacent to the substation compound; 
• New and upgraded access tracks, passing places and turning heads; 
• Hardstanding areas for cranes at each turbine location; 
• Turbine foundations; 
• Drainage works; 
• Up to four borrow pits; 
• Power cables, linking the wind turbines, laid in trenches underground,
including cable markers; 
• An on-site electrical substation, parking, and a small storage compound; 
• Temporary laydown areas; 
• Temporary construction compound, including parking, and welfare
facilities; and associated ancillary works. 
Infrastructure  
4.10 Connection to Electricity Grid – the grid connection would be to the existing
Taynuilt substation, which is located approximately 6.7km to the east of the
proposed on-site substation. The nature and location of the connection will be
determined by SSEN in a separate application process.  
4.11 Scottish Water – have advised the ECU they have no objection to this proposal.
In addition, advise that a review of their records indicates that the proposed
development falls partly within a drinking water catchment where a Scottish
Water abstraction is located. Scottish Water abstractions are designated as
Drinking Water Protected Areas (DWPA) under Article 7 of the Water Framework
Directive. Loch Nell supplies Tullich Water Treatment Works (WTW) and it is
essential that water quality and water quantity in the area are protected. 
Two turbines are located within the Loch Nell catchment and a further two
turbines are located within the buffer zone. Although this is likely to be low risk
to the source supply catchment it would always be the preference of Scottish
Water to request that turbines are moved wholly out with the catchment where
possible.
Page 60

Page 61

The fact that this area is located within a drinking water catchment should be
noted in future documentation. 
Anyone working on site should be made aware of this during site inductions. 
The ECU have asked the applicant to review this response and confirm how they
are planning to address the points raised. In response, the applicant has advised
that as a result of other constraints it has not been possible to move the turbines
out of the DWPA and buffer zone. 
4.12 Private Water supplies (PWS) – There are no Private Water Supplies within
250m of the proposed development.  SEPA has not made any comment to the
ECU with regard to PWS.  
5. NET ECONOMIC IMPACT, INCLUDING LOCAL AND COMMUNITY SOCIO-
ECONOMIC BENEFITS  
5.1 Policy 11 – Energy of NPF4 states that proposals will only be supported where
they maximise net economic impact, including local and community socio-
economic benefits such as employment, associated business, and supply chain
opportunities.  Policy 30 – the Sustainable Growth of Renewables of LDP 2
requires all applications for wind turbine developments to be assessed in terms
of net economic impact, including local and community socio-economic benefits
such as employment, associated business, and supply chain opportunities.  
5.2 A Socio-Economic Statement has been submitted with the application. This
assesses the effects of the Proposed Development on socio-economics,
tourism, and recreation during the construction and operation phases. The key
takeaways of this statement are summarised below: 
• Up to £8.2 million is anticipated to be spent within the local economy during
phase the construction and up to £1.3 million is anticipated to be spent annually
during the operational phase. 
• Net employment benefit of up to 43 jobs (direct, indirect and induced) will be
created across Argyll and Bute during the construction phase, as well as up to 8
jobs (direct, indirect and induced) during the operational phase. This will provide
up to 66 Full Tim Equivalent (FTE) job years during the construction phase and
up to 382 job years during the operational phase. 
• Net economic benefit of up to £4.3 million during the construction phase and
up to £786,344 (annually) during the operational phase. 
• Any impacts on recreational activity upon forest tracks due to the construction
phase will be mitigated through the implementation of an Outdoor Access
Management Plan (OAMP). 
• No changes in tourism or recreational activity are anticipated as a result of the
Proposed Development. 
5.3 The Applicant has also stated they will contribute £5000 per MW of installed
capacity per annum (index linked) into a community benefit fund for the lifetime
of the proposed development (50 years). The Community Benefit Fund would
provide long-term revenue which could be used to support community projects.
Local communities would have the flexibility to choose how the money is spent
and prioritise it on the things which matter most to them. Final decisions with
regards to the Community Benefit arrangement will be made by communities
themselves should the Proposed Development be consented, with guidance
Page 61

Page 62

from the Applicant where appropriate. The Applicant is seeking to engage with
local community councils to establish a Community Liaison Group (CLG) which
could administer the fund.  
5.4 In addition, in terms of socio-economic benefits in the local community, the
applicant has advised: ‘If consented, the Proposed Development will create
significant opportunities for local businesses through the construction and
operation phases. This will include; accommodation providers, manufacturers
and suppliers, contractors, and transpeople across a wider range of specialities,
including construction, groundworks, landscaping, and plant hire. Local
businesses and suppliers who are interested in getting involved in the Proposed
Development can also be added to the Applicant’s database.’  
5.5 The economic benefits associated with this proposal relating to job creation and
benefits to the local economy from the influx of construction workers, by
spending on accommodation, eating out and visiting local attractions are a
relevant consideration, which has been considered.  Community Benefit is not
however, a ‘material planning consideration’ in the determination of planning
applications, as there is no planning mechanism available to secure it.  If consent
were to be granted, the negotiation of any community benefit either directly with
the local community or under the auspices of the Council, would take place
outside the application process.  
5.6 Having due regard to the above it is considered a degree of net economic
impact including local and community socio-economic benefits typical of
such developments will be provided.  It is therefore concluded that the
proposal is consistent with the provisions of Policy 11 – Energy of NPF4
and Policy 30 – The Sustainable Growth of Renewable of LDP2 in this
regard.  
6. IMPACTS ON COMMUNITIES AND INDIVIDUAL DWELLINGS, INCLUDING
RESIDENTIAL AMENITY, VISUAL IMPACT, NOISE AND SHADOW FLICKER  
6.1 Policy 11 – Energy of NPF4 requires that project design and mitigation will
demonstrate how impacts on communities and individual dwellings, including
residential amenity, visual impact, noise and shadow flicker have been
addressed.  Policy 30 – the Sustainable Growth of Renewables of LDP2 requires
all applications for renewable developments to be assessed in terms of impacts
on communities and individual dwellings, including visual impact, residential
amenity noise and shadow flicker (including cumulative).  
6.2 Noise
ABC Noise Consultant – has concluded that, in general, good practice has been
adopted by the applicant, with a few minor issues identified: The consideration
of cumulative operational noise impacts (A review of cumulative impacts with the
existing Bein Ghlas wind farm (operational) and Corr Cnoch wind farm (in
planning); clarification on the labelling on properties, confirmation that there are
no derelict properties with residential planning status in the planning area; 
Confirmation of the correction of predicted LAeq to give LA90 by subtracting 2
dB.  
6.3 Following a satisfactory response, it is considered that there would be no
reasons to object on noise grounds, subject to the application of a condition
Page 62

Page 63

recommended by the Council’s Noise Consultant which covers noise levels,
tonality and amplitude modulation.  
6.4 Shadow Flicker
A shadow flicker assessment is required when any properties lie within 10 rotor
diameters of a wind farm.  This is in line with Scottish Government online
renewables planning advice on ‘onshore wind turbines’ which states that: “where
separation is provided between wind turbines and nearby dwellings (as a rule
10 rotor diameters), ‘shadow flicker’ should not be a problem.”  
6.5 The EIAR identified nearby properties where shadow flicker effects might arise.
The rotor diameter of the candidate turbine is 162 metres.  Based on the Scottish
Government guidance, the ten rotor diameter distance would be 1620 metres. 
The EIAR identified 2 properties within this 1620 m distance, Glenamachrie and
Dorran Cottage. No properties were identified as likely to exceed the 30 hours
per year threshold of significance, however, both receptors have been identified
as marginally exceeding the daily threshold of 30 minutes by 1 minute.
Notwithstanding this, given shadow flicker is only predicted between 06:00am –
07:00am, which the majority of the time, falls outside typical waking hours - this
timing minimises potential disturbance, where impacts would not be considered
significant in disturbance to residential amenity areas. As such, identified
exceedances are not considered to be significant, with a low likelihood of
disturbance due to shadow flicker. The effect of shadow flicker was therefore
considered to be non-significant in terms of the EIA Regulations. The applicant
concludes that shadow flicker is expected to have a low and not significant effect
on nearby sensitive receptors.  
6.6 The applicants supporting information states that flicker is only expected to occur
from the two most southernly turbines (T1 & T3) at each location. In the event a
shadow flicker complaint is received with suitable evidence, the turbines can be
fitted with a shadow stop system that can be programmed to automatically shut
down when environmental conditions are conducive to shadow flicker at affected
properties. This means that the turbine would be equipped with a light level
sensor, which would be used to ensure the turbine shuts down during periods of
sufficient light to generate shadow flicker. Shadow flicker impacts could be
managed through a suitable planning condition that requires a mitigation
scheme to be submitted to, and approved by, the Local Planning Authority in
response to a justified complaint. Considering this, it is recommended that if
consent is granted, consideration be given by the ECU that a shadow flicker
mitigation scheme is secured by a planning condition.  
6.7 Having due regard to the above it is concluded that the proposal is
acceptable in terms of any adverse noise or potential adverse shadow
flicker impacts, subject to relevant conditions, and is therefore consistent
with the provisions of Policy 11- Energy, and Policy 30 – The Sustainable
Growth of Renewables of the ABLDP2. 
7. SIGNIFICANT LANDSCAPE AND VISUAL IMPACTS  
7.1 Policy 11 – Energy of NPF4 requires that project design and mitigation
demonstrates how significant landscape and visual impacts have been
addressed, recognising that such impacts are to be expected for some forms of
renewable energy.  Where impacts are localised and/or appropriate design
Page 63

Page 64

mitigation has been applied, they will generally be considered acceptable. 
Policy 4 a) - Natural Places of NPF4 states that proposals which by virtue of
type, location or scale will have an unacceptable impact on the natural
environment will not be supported.  Policy 30 – The Sustainable Growth of
Renewables of LDP2 requires all applications for wind turbine developments to
be assessed against landscape and visual impacts.  
7.2 The Council’s Consultant Landscape Architect - has undertaken a review of the
landscape and visual effects of the proposal, which is based on examination of
the EIAR and visits to the area surrounding the site. The following documents
have been considered:
• The Landscape and Visual Impact Assessment (LVIA) within the
Environmental Impact Assessment Report (EIAR) accompanying the
Section 36 application ECU00004841, submitted in December 2025; and 
• Further Environmental Information Report (FEI) submitted in September
2025 (which includes additional cumulative assessment of the effects of
the proposed wind farm together with the neighbouring proposal at Corr
Chnoc wind farm, which is now also at application stage with the ECU,
as well as the Beinn Ghlas Repowering scheme planning application).  
7.3 The proposal – would comprise 6 wind turbines up to 200m high to blade tip.
Ancillary development would include approximately 10km of new/upgraded
access track, a substation/control building and battery energy storage facility
(this sited on the construction compound).  Visible aviation lighting would be
affixed to 5 of the 6 wind turbines. The proposed development would require
removal of 18 hectares of woodland (the majority of this comprising Sitka spruce)
and compensatory planting would therefore be required. Connection to the grid
would be at the Taynuilt substation, 6.7km east of the proposed development
site. 
7.4 An Outline Habitat Management Plan (OHMP) is presented in Appendix 10.5.
The OHMP focuses on restoring peatland habitat and providing habitats for
specific species. Measures include wetting of peatland, the removal of self-
seeded Sitka spruce on the site, the removal of rhododendron off-site and
management of grazing.     
7.5 The landscape and visual information provided by the Applicant
The Council’s Consultant Landscape Advisor has confirmed that the Landscape
and Visual Impact Assessment (LVIA) set out in Chapter 6 of the EIA-R accords
with the Guidelines for Landscape and Visual Impact Assessment Third Edition.
The Zone of Theoretical Visibility (ZTV) maps provided are clear. The day-time
photomontage visualisations accord with best practice guidance and present an
accurate representation of the proposed development. Illustrative wirelines are
informative in most instances although the absence of location details for the
ferry route view makes it difficult to fully gauge effects and the wireline itself
appears confusing. The wirelines produced compare poorly with the
visualisations included from ferry routes in the Corr Chnoc wind farm EIA which
accord with best practice guidance. Night-time visualisations have been
prepared from four representative viewpoints. It is considered that these provide
less of an accurate representation of what is likely to be seen in the field and
should be treated with caution. 
Page 64

Page 65

7.6 Landscape Effects – The proposed site lies within the Craggy Upland with
Settled Glens Landscape Character Type (LCT), which is identified in the 2017
Argyll and Bute Landscape Wind Energy Capacity Study (LWECS). The Craggy
Upland with Settled Glens LCT has a diverse character influenced by the
irregular complex landform of deep glens, rocky outcrops, craggy hills and
occasional small lochans. The intricate pattern of woodland, especially
broadleaved woodlands, pastures, wetland and settlement contributes to the
diversity of this landscape and reinforces its medium to small scale. The LWECS
found this LCT to be of high sensitivity to wind turbines >80m high.  
7.7 The proposed development would be located close to the small craggy hill of
Deadh Choimhead and adjacent to the narrow Glen Lonan. Coniferous forestry
covers the long slopes which extend to the north of the pronounced summit of
this hill. The proposed development site comprises open craggy moorland which
is patterned with occasional traces of broadleaved woodland lying to the north
of the summit of Deadh Choimhead. Land to the north and west of the site is
diverse, featuring a string of narrow lochs nestled within low hills which are
covered with extensive broadleaved woodland on their south-eastern side. The
form of Deadh Choimhead is particularly pronounced in views from the Glen
Lonan area and from the public road near Lonan House to the east and the road
north-west of Loch Nell. The turbines at 200m high would appear to dominate
the relief of this hill and greatly detract from its character in these views with this
effect most severe from Viewpoint 1. It is considered that effects on the Craggy
Upland with Settled Glens LCT would be significant and adverse, with these
effects extending up to around 6km of the proposed development.  
7.8 Significant adverse effects would also be likely to occur on the character of the
Rocky Mosaic LCT where it covers the northern shores of outer Loch Etive and
the Lowland Ridges and Moss LCT in the Moss of Achnacree area. The
proposed development would disrupt the scenic layering of the small irregular
hills of the Craggy Upland with Settled Glens LCT with Loch Etive and its diverse
shores. This is illustrated in Viewpoints 6 and 7 from the northern shore of Loch
Etive. 
7.9 While effects on the perceptual characteristics of the High Tops LCT (which
covers the dramatic mountainous landscapes of Argyll lying to the east and north
of the proposed development) would be adverse in some areas, the distance of
these mountains from the wind farm would limit the magnitude of change and,
where they occur to the east, the presence of multiple operational (and
consented) wind farm developments in closer proximity in the Loch Awe/Loch
Fyne area would additionally reduce effects. It is not considered that effects on
the character of the High Tops LCT would be significant. Similarly, the limited
extent of visibility of the proposed development across the visually contained
Craggy Coasts and Islands LCT would not result in overall significant effects on
its character. 
7.10 Landscape Designations – the application site is not located within any
designated National or Local Landscape Area, and it is considered that the
proposals would not have significant adverse effects on the special qualities of
the Loch Lomond and Trossachs National Park.  
7.11 In addition, the proposed development would lie within 8.8km of the Lynn of Lorn
National Scenic Area (NSA). There would be views of the turbines principally from
the western side of Lismore, across the southern part of the sea channel of the Lynn
Page 65

Page 66

of Lorn and from the east-facing coastal edge of the heavily wooded Garbh Ard
peninsula. Viewpoint 14 is located on the west side of Lismore while Viewpoint 15
lies on the A828 just outside the north-eastern boundary of the NSA. Technical
Appendix 6.2 includes an Illustrative Wireline from the Lismore-Oban ferry although
it is not clear whether this lies within the NSA as there seems to be no map showing
where the viewpoint is located (it is not shown on ZTV Figures 6.1 and 6.2) and the
distance of the viewpoint from the nearest turbine is also not noted on the
visualisation.  
7.12 It is considered that significant adverse effects could arise on views from parts
of this NSA, particularly from the open sea in the southern part of the designated
area away from the partial screening provided by the peninsula of Fionn Ard.
This would adversely affect the wider setting to the NSA although the turbines
would not interrupt views towards the Mainland and Mull mountains which are
noted in NatureScot’s description of special qualities. Given the distance of the
proposed development from the designated area, the limited visibility likely to
occur from the more contained and intimately scaled parts of the NSA, and the
focus of the special qualities on the highly scenic linear form of ridges and
islands and islets and their rich vegetation cover, it is considered that the integrity
of this NSA would not be affected. In addition, it is not considered that significant
adverse effects would occur on the special qualities of any other NSA. 
7.13 Effects on Local landscape Areas - There would be relatively limited visibility of
the proposed development from the North West Argyll Coast Local Landscape
Area (LLA) which lies to the west of the development site. While it is considered
that there would be adverse and significant effects on views from Kerrera
(represented by Viewpoint 12) and from Viewpoint 11 at Knipoch, it is considered
that the qualities that the LLA is likely to have been designated for would focus
on the intricacies of the Argyll coast and islands and views to Mull and these
would not be significantly affected by the proposed development, which is
located inland from the coast. 
7.14 There would also be some visibility of the proposed development from the
extensive North Argyll LLA. Viewpoints 7, 15 and 16 lie within this designated
landscape. It is considered that significant adverse effects would arise on views
from Inveresragan on the north shore of Loch Etive (Viewpoint 7). Adverse but
not significant effects would arise on views from Ben Cruachan (Viewpoint 16)
and from the Strath of Appin area, represented by Viewpoint 15. Given the
relatively limited extent of visibility and the likelihood of the reasons for
designation of the LLA being the mountainous scenery and their dramatic
juxtaposition with the northern shores and waters of Loch Etive and the Lynn of
Lorn area, it is considered that the integrity of this designated landscape would
be unaffected. 
7.15 Visual Effects - There would be close visibility of the proposed development from
within Glen Lonan and the settled valley of the Lusragan Burn which lies to the west
of the development site. Within 5-10km of the proposal, theoretical visibility would
be extensive across the sea basin to the north-west, the western part of Lismore
and outer Loch Etive, particularly concentrated along its settled northern shore. The
proposed development comprises a small scheme of just 6 turbines although these
turbines would be up to 200m to blade tip and will thus appear very large in relation
to the small to medium scale landform of the landscape they are sited within. 
Page 66

Page 67

7.16 Significant visual effects are predicted from the following areas: 
• The Glen Lonan area affecting views from Core Paths, National Cycle
Route 78 and from settlement. Viewpoints 1 and 2 represent views from
this area. All six turbines would be visible from Viewpoint 1 at Barguillean
which is located at an elevated point in the minor road in the more open
eastern part of Glen Lonan. The turbines (and particularly Turbine 6)
would dominate the scale of the craggy summit of Deadh Choimhead
which forms a notable feature in views from this area. While only 1 or 2
of the turbines would be seen from within the narrow and strongly
contained glen floor to the south, new very large-scale infrastructure
would be introduced to this area, significantly detracting from the intimate
scale of this landscape and the sense of naturalness and seclusion that
can be experienced. 
• Roads and settlement east of Oban as represented by Viewpoints 3
from Barranrioch and Viewpoint 4 from Ardchonnel where the proposed
turbines would form dominant features at distances of between 3.5-4km
and would (particularly in the more open context of Viewpoint 3) contrast
with the scale of the low craggy ridges and small hills characteristic of
this area. There would also be brief but a significant impact on views from
the A85 east of Taynuilt (illustrated by the cumulative visualisation from
Viewpoint 9 in the Corr Chnoc wind farm Additional Information Report).
• Loch Nell represented by Viewpoint 10 which is located at a popular
layby on its shore. The proposed turbines would form a dominant and
detracting feature seen at the end of views across the loch and would
significantly diminish the sense of naturalness and tranquillity associated
with this small loch. 
• Small hills east of Oban including Viewpoint 9 from the summit of
Barran an Fhraoich (which is shown as a promoted viewpoint on 1:50k
OS maps although does not appear to be frequently accessed) and
Pulpit Hill (Illustrative Wireline I). In these views the proposed turbines
would intrude on views of the Ben Cruachan massif which forms a focus
to the east. 
• The shores of outer Loch Etive – represented by Viewpoints 5, 6, 7
and 13 and including views from the grounds of Ardchattan Priory
Inventory listed Garden and Designed Landscape (Cultural Heritage
Figure 7.31). The operational wind farm of Beinn Ghlas is visible in some
of these views but the closer proximity and substantially larger turbines
of the proposed development would result in significantly greater
intrusion into scenically rich views comprising diverse wooded and
farmed settled loch shores, open water and a backdrop of layered craggy
hills and ridges. 
• The sea basin between Oban, Mull and Lismore affecting views from
ferries and other watercraft. Viewpoint 13 from Dunstaffnage Castle (and
the ZTV in Figure 6.2) illustrates the degree of intrusion likely to affect
views from near shore areas. There would also be a significant adverse
effect on views from Kerrera where the turbines would intrude on views
towards the Ben Cruachan massif (Viewpoint 12). 
Proposed visible aviation lighting on five of the wind turbines would extend the
duration of significant adverse effects in close-by views from parts of Glen Lonan
and from the settled area between Oban and the proposed development.   
Page 67

Page 68

7.17 Residential Visual Amenity Effects - A Residential Visual Amenity Assessment
(RVAA) has been undertaken by the Applicant. This identifies 5 residential
properties/groups of properties with potential views of the proposed
development lying within 2 km of the nearest turbine. Illustrative wirelines are
stated in paragraph 17 of the RVAA as being included in Appendix 6.2. The
names of these illustrations do not always accord with those labelled on Figure
1 of Appendix 6.4. It is assumed that the wireline titled G Angus’ Garden is the
same property as Duntanachan shown on Figure 1 in Appendix 6.4 but there is
no assessment of effects on visual amenity from this property, or on properties
at Fearnoch which are also shown on Figure 1 but do not appear in the detailed
assessment table on page 3 of the RVAA. There is nothing to indicate in
paragraphs 17 and 18 of the RVAA why these properties have been omitted and
indeed paragraph 18 refers to two further properties located close to the edge
of the study area which are described as having been included in the
assessment. The Landscape Consultant cannot come to a view on potential
visual amenity effects on residential properties until clarification on this matter is
obtained from the Applicant. It is considered that the ECU should have this
matter clarified prior to determining the application.  
7.18 Cumulative landscape and visual effects with other proposed wind farms
The proposed development would introduce wind farm development into a new
area where no large wind turbines are present and where the closest operational
wind farms (Beinn Ghlas and Carraig Gheal) have a minimal visual influence. 
The Corr Chnoc, Musdale, Beinn Ghlas Repowering and Barachander proposed
wind farm developments have greatest potential to incur significant adverse
cumulative effects with the proposed development. With regard to the proposed
Corr Chnoc wind farm, significant adverse combined cumulative effects would
arise on the character of the Craggy Upland with Settled Glens LCT, on views
from Glen Lonan, the area east of Oban and west of the development site, from
the Loch Nell area and from the Taynuilt area. While both developments would
be seen from the northern shores of Loch Etive, the proposed development
(Cruach Clenamachrie) would be considerably more intrusive because of its
closer proximity and increased elevation (and lesser degree of screening by
landform) when compared with the Corr Choc wind farm proposal. In respect of
the Beinn Ghlas repowering scheme, the Council’s Landscape Consultant has
advised that, having reviewed the cumulative ZTV mapping and visualisations,
they do not consider that significant adverse cumulative effects would occur with
the Beinn Ghlas Repowering scheme and the proposed development.  
7.19 Nighttime lighting effects – The Civil Aviation Authority (CAA) requires that
‘enroute obstacles’ at or above 150m above ground level are lit with visible
lighting to assist their detection by aircraft.  As the proposed turbines would be
200m to tip height, there would be a requirement for them to display medium
intensity ‘steady’ (non-flashing) red aviation lights at night.  These would be fitted
to the of nacelles of the turbines.  All nacelles would also be fitted with infra-red
lighting which is not visible to the human eye. In this instance, it is considered
that proposed visible aviation lighting on five of the wind turbines would extend
the duration of significant adverse effects in close-by views from parts of Glen
Lonan, and from the settled area between Oban and the proposed development.
Visible aviation lighting associated with the Corr Chnoc wind farm, and the
proposed development would extend the duration of significant adverse
cumulative effects from some views and would, in combination, diminish the dark
skies characteristic of this part of Argyll. The Beinn Ghlas Repowering scheme
would not require visible aviation lighting.  
Page 68

Page 69

7.20 Conclusions - National Policy Framework 4 (NPF4) gives strong support to
renewable energy developments. NPF4 Policy 11e requires project design and
mitigation to demonstrate how impacts on communities and significant
landscape and visual impacts are addressed. In terms of significant landscape
and visual impacts, 11e ii states that such impacts are to be expected for some
forms of renewable energy and “where impacts are localised and/or appropriate
design mitigation has been applied, they will generally be considered to be
acceptable”. NPF4 provides no guidance on the definition of what constitutes
‘localised’ effects. The Scottish Government’s Onshore Wind Policy Statement
stresses that change will occur to the landscape but also states the importance
of ensuring that the right development happens in the right place.    
7.21 The proposed development would result in significant landscape and visual
effects out of proportion to its relatively small size (in terms of numbers of
turbines). Significant adverse effects on landscape character would principally
affect the Glen Lonan area. It would introduce new and very large infrastructure
to a small to medium scale and diverse landscape with a distinct sense of
naturalness. The 200m high wind turbines proposed would dominate the scale
of the landform of small craggy hills, narrow valleys and lochs. While this
landscape is not designated or otherwise formally valued it possesses a
distinctive scenic character and is of high sensitivity to development of this
nature.  
7.22 Significant adverse effects on views would principally occur in the Glen Lonan
area. This area features generally dispersed settlement accessed by narrow
roads. The proposed development would have significant adverse effects on
views from the minor roads/promoted cycle route and footpaths generally lying
within 5km from the nearest turbine. Views from Loch Nell, from the small hills
surrounding the development site, from parts of the island of Kerrera and from
the northern shores of outer Loch Etive would also be significantly and adversely
affected. Visible aviation lighting would extend significant adverse effects
particularly on closer views within around 5km of the proposed development. 
7.23 Significant combined adverse cumulative effects would occur with the nearby
application-stage Corr Chnoc wind farm on landscape character and on views.
The combined effect of these nearby developments would increase the
dominant effect of very large wind turbines and associated built infrastructure on
the Craggy Uplands with Settled Glens LCT. Significant cumulative effects would
occur on views from Loch Nell, on visual receptors within the lower-lying settled
valleys between Oban and the proposed development site and east of Fearnoch
Forest.   
7.24 The Council’s Consultant Landscape Adviser has suggested mitigation which
would have the potential to reduce the significance of effects.  These are: 
• It is recommended that the Council request that the Applicant considers
a reduction in turbine size (which is likely to necessitate repositioning of
turbines which may in turn resolve the lack of unity of the scheme seen
in close views and present a tighter grouping of turbines which could
further help mitigate landscape and visual effects). 
• Clarification is also needed from the Applicant on the RVAA in terms of
the properties assessed (see comment under the Residential Visual
Page 69

Page 70

Amenity Effects heading in this report) and the location of the offshore
Illustrative Wireline viewpoint from the Oban-Lismore ferry.    
7.25 The Applicant has provided a response to the key points raised by the Council’s
Landscape Advisor in a further submission document on the 15/10/25. letter
dated 29/9/25.  They advise that in their view, the differences of opinion are
relatively minor in each case, there is no notable difference in relation to
designated landscapes, and the differences of opinion in relation the effects on
landscape character are very limited – a slightly greater extent of significant
effects within the host LCT (though this may be because review attributes slightly
higher sensitivity to the LCT and effects in the 4-6km distance band are identified
as Small by the LVIA). Furthermore: 
Reduction in Turbine size and repositioning - The recommendation that ABC
should seek that the Applicant markedly reduce the heights of the turbines is
based only on changing its appearance, not on reducing significant landscape
and visual effects – as referenced in paragraph 5 above. The suggestion that
this might help to improve the appearance of the design is based on stated
concerns relating to viewpoints 1, 3 and 9 (under ‘visual effects’ on page 4),
however in each case it is simply the case that the nearest turbine appears larger
– a factor that commonly arises in close views of wind farms and does not
warrant the description of the layout as having a “jarring and uncoordinated
appearance” in some close views as set out in the conclusions. 
The conclusion that the turbines are too large for the location is justified in part
with reference to the pattern of operational and consented development in Argyll
and Bute. However, there is no support within policy or guidance for future
development to continue the pattern of the past. Older wind farms were
consented under different planning policies when different turbine technologies
were available and do not provide a template for the present or future. 
Realistically, the “substantial lowering” of turbines suggested would only also
result in the repositioning of turbines suggested in the conclusions if there was
also a notable reduction in rotor diameter and the on-site constraints permit
repositioning. Both height and rotor reductions would reduce the benefits in
terms of renewable energy from the wind farm. These options have already been
considered and rejected in developing the design which seeks to optimise the
balance between renewable energy generation and minimising significant
landscape and visual effects. 
Residential Visual Amenity Assessment (RVAA) clarification - Paragraph 18 of
the RVAA (Appendix 6.4 to the EIA report) clearly sets out that “three properties
have been located within the 2km study area ….” – these three are Dorran
Cottage, Glenamacrie Farmhouse and the nearby bungalow. Paragraph 18
continues “… Two further properties are located at the edge of the study area
and are also included” – these are 2 Kilvaree and Clachdubh. Those five
properties are clearly labelled on RVAA Figure 1 and then considered in the
table which follows that description in the RVAA. 
Illustrative viewpoints I and J in Appendix 6.2 and representative viewpoint 2 are
referred to in the detailed text relating to each of the properties as required – as
paragraph 17 of the RVAA states. 
Page 70

Page 71

Other properties further beyond the RVAA study area to the north at Fearnoch
and to the east at Duntanachan are indicated as pink dots on Figure 1 (just as
all plans provided within the LVIA do not abruptly stop at the edge of the study
area), but this does not mean that they are or should be included in the RVAA. 
Ferry route view location query – The Council’s Landscape Consultant refers to
‘the ferry route view’, whereas there are two (Illustrative View A from the Oban-
Mull route and Illustrative view B from the Oban-Lismore route.) This may be the
reason for any confusion. For clarity the location of these two views is plotted in
an attached plan.  
7.26 Officer’s Conclusions – Based on the advice of the Council’s Consultant
Landscape Architect, and notwithstanding the acknowledged difference in
opinion with the Applicant’s Landscape Planning Consultant, it is concluded that
the proposal warrants an objection on landscape and visual grounds. 
7.27 In summary, having due regard to all of the above it is concluded that the
proposal cannot comply with the provisions of Policies 11 – Energy and 4
– Natural Places of NPF4, and Policy 30 – The Sustainable Growth of
Renewables of ABLDP2 in this respect. 
8. IMPACTS ON TOURISM AND RECREATION    
8.1 Policy 11 – Energy of NPF4 does not require impacts on tourism to be
considered.  Policy 30 – The Sustainable Growth of Renewables of LDP2
requires all applications for wind turbine developments to be assessed against
impacts on tourism and recreation.  
8.2 Tourism – Policy 11 of NPF4 does not include a requirement for the impact of
proposals on tourism to be assessed. However, Policy 30 – The Sustainable
Growth of Renewables of the LDP does. In Argyll & Bute the landscape is
regarded as being a particularly valued asset both in terms of its intrinsic
qualities and in terms of its value to the tourism economy. For all types of
development, the maintenance of landscape character is an important facet of
decision-making in the countryside in Argyll & Bute, regardless of the scale of
development proposed.  
8.3 As Tourism and Landscape & Visual matters are intrinsically linked, and there is
little evidence to demonstrate whether wind farms adversely affect tourism, it is
considered that such  impacts are covered in the landscape and visual impact
assessment of the proposal.    
8.4 Having due regard to the above it is considered that the proposal is
consistent with the provisions of Policy 11 – Energy of NPF4 and Policies
04 – Sustainable Development and 30 – The Sustainable Growth of
Renewables of ABLDP2 in this respect.  
9. PUBLIC ACCESS    
9.1 Policy 11 – Energy of NPF4 requires that project design and mitigation
demonstrates how impacts on public access are addressed, including impact on
long distance walking, and cycling routes and scenic routes. Policy 30 – the
Sustainable Growth of Renewables of LDP2 requires all applications for wind
Page 71

Page 72

turbine developments to be assessed against impacts on public access,
including impact on long distance walking and cycling routes and those scenic
routes identified in the NPF. Policy 32 – Active Travel of LDP2 requires active
travel and recreation to be integrated in developments from the start of the wider
design process and existing active travel networks should be safeguarded and
integrated with the development. 
9.2 There are limited pedestrian facilities in the vicinity of the site, however,
approximately 500 metres to the south of the wind farm site the road through
Glen Lonan is a Core Path linking to the A85 in the east / north east with the
National Cycle Network (NCN) route to the west.  Core Path 160, the Taynuilt to
Oban route, is 14.5kmin in length between the A85 and NCN route 78.  Other
Core Paths in the area include Core Path c157 (c) Taynuilt – Airds circular, which
runs parallel to the A85 at Taynuilt and also Core Path C300 (a) Kilchrenan to
Taynuilt. Core Path C177 (d) Black Lochs, Kilvaree Connel is located 2km to the
north west of the site. In addition, the forestry tracks within Fearnoch Forest are
open to recreational use and interactions between traffic associated with the
Proposed Development and other path users may occur.  
9.3 The applicant’s Socio-Economic Statement considers how recreational activities
may be affected by the development. It concludes that the main effects that could
be experienced during the construction phase are visual/noise impacts from
machinery, on-site activity and construction traffic. Some views of construction
will be visible from some core paths when facing towards the Proposed
Development, however, the ZTV does not take into account-built development
and vegetation, which can significantly reduce the area and extent of actual
visibility. The woodland areas surrounding the above-mentioned paths will
provide screening and blocking of the Proposed Development, meaning views
of the construction phase will not be constant.     
9.4 
9.5 
Forestry tracks are not designated. However, they are used for recreational
purposes by the public. Forestry tracks run throughout Fearnoch Forest and
intersect with the eastern part of the Application Boundary, including large parts
of the Proposed Access Track. As a result, the Proposed Development is
anticipated to have visual and access impacts on forestry tracks during the
construction phase. During the construction phase of the Proposed
Development, it is anticipated that the sections of the forestry track affected by
construction activities will remain open to the public where appropriate.
Mitigation measures such as an Outdoor Access Management Plan (OAMP)
which will allow forestry tracks to remain open, will be developed with Argyll and
Bute Council and secured via a planning condition. Efforts will be made to
separate users of forest tracks from construction traffic via crossing points,
temporary diversions and traffic signage. Path users will also have the right of
way. Any closures will be temporary and are not anticipated to be in place
throughout the full construction period. Forestry tracks which will be utilised by
construction traffic will also be upgraded. Therefore, increasing the recreational
value of the tracks once the construction phase is over. Finally, there is not
expected to be a change in recreational activity on the forestry tracks during the
operational phase of the Proposed Development. 
ABC Core Paths – At time of writing no response has been received and it is
therefore assumed that there are no issues relating to public access in relation
to this proposal, however, the Council would request a condition requiring the
Page 72

Page 73

9.6 
submission of an Access Plan, should the ECU propose to approve the
application. 
Having due regard to the above it is considered that the proposal is
consistent with the provisions of Policy 11- Energy of NPF4, Policy 30 –
the Sustainable Growth of Renewables; and Policy 32 - Active Travel of the
ABLDP2.  
10. AVIATION AND DEFENCE INTERESTS, INCLUDING SEISMOLOGICAL
RECORDING   
10.1 Policy 11 – Energy of NPF4 requires that project design and mitigations
demonstrates how impacts on aviation and defence interests, including
seismological recording, have been addressed. Policy 30 – the Sustainable
Growth of Renewables of LDP2 requires impacts on aviation and defence
interests and seismological recording to be addressed. Policy 43 – Safeguarding
of Aerodromes of LDP2 stipulates that development will not be permitted where
it would compromise the safe operation of an Aerodrome or Technical Site or
constrain their present or future operations.  
10.2 Defence Infrastructure Organisation (DIO) – have advised the ECU that, subject
to conditions to secure an Aviation Lighting Scheme and Aviation Charting and
Safety  Management details the MOD has no objection.  
10.3 
10.4
Highlands and Islands Airports Ltd and NATS – have advised the ECU that the
proposal is out with safeguarding criteria and they have no objections to the
application. 
Oban and the Isles Airport – have advised no objections to the proposal and
they have been in direct engagement with the developer.  
10.5 Having due regard to the above, subject to the conditions recommended
by the  Ministry of Defence DIO, it is concluded the proposal is consistent
with the provisions of Policy 11 – Energy of NPF4 and Policies 30 – The
Sustainable Growth of Renewables and 43 – Safeguarding of Aerodromes,
of the  ABLDP2 in this respect.    
11. TELECOMMUNICATIONS AND BROADCASTING INSTALLATIONS  
11.1 Policy 11 – Energy of NPF4 requires that project design and mitigation
demonstrates how impacts on telecommunications and broadcasting
installations, have been addressed particularly, ensuring that transmission links
are not compromised. Policy 30 – The Sustainable Growth of Renewables of
LDP2 requires all applications for wind turbine developments to be assessed
against impacts on telecommunications and broadcasting installations,
particularly ensuring that transmission links are not compromised.    
11.2 BT and the Joint Radio Company - have advised the ECU that they have no
objection to the proposal.  
11.3 Having due regard to the above it is concluded that the proposal will not
have any adverse impacts on telecommunications, broadcasting
installations and transmission links (including cumulative impacts) and is
Page 73

Page 74

consistent with the provisions of Policy 11- Energy of NPF4 and Policy 30
– The Sustainable Growth of Renewables of LDP2 in this respect.    
12. ROAD TRAFFIC AND ADJACENT TRUNK ROADS    
12.1 Policy 11 – Energy of NPF4 requires that project design and mitigation
demonstrates how impacts on road traffic and on adjacent trunk roads have
been addressed, including during construction. Policy 30 – the Sustainable
Growth of Renewables of LDP2 requires all applications for wind turbine
developments to be assessed against impacts on road traffic and impacts on
adjacent trunk roads. Policy 35 – Design of New and Existing, Public Roads and
Private Access Regimes of LDP2 acceptance of development utilising new and
existing public roads, private roads and private access regimes is subject to road
safety and street design issues being addressed to the satisfaction of the Roads
Authority and the Planning Authority. Policy 38 – Construction Standards for
Public Roads requires that accesses which connect to or impact significantly on
a Trunk Road require consultation with Transport Scotland.  
12.2 Transport Scotland (TS) have advised the ECU they have no objection subject
to conditions relating to: approval of the detailed design of the proposed new
access onto the Trunk Road, abnormal loads route; accommodation measures
for abnormal load route; additional signing or temporary traffic control measures;
and a Construction Traffic Management Plan (CTMP). A number of advisory
notes are also suggested, in relation to requirements to undertake works within
the trunk road boundary and legal agreements with the Trunk Road Authority.  
12.3 ABC’s Roads & Amenity Services - at time of writing no response has been
received and it is therefore assumed that there are no issues affecting the local
road network, noting that access to the site is proposed to be taken from the A85
Trunk Road.  
12.4 Having due regard to the above, subject to the conditions recommended
by Transport Scotland, it is considered that the proposal is consistent with
the provisions of Policy 11 – Energy of NPF4, Policy 30 – The Sustainable
Growth of Renewables, Policy 35 – Design of New and Existing, Public
Roads and Private Access Regimes and Policy 38 – Construction
Standards for Public Roads in this regard.  It is recommended that the
conditions required by Transport Scotland are attached to any consent
granted by the ECU. 
13. HISTORIC ENVIRONMENT    
13.1 Policy 11 – Energy of NPF4 requires that project design and mitigation
demonstrates how impacts on the historic environment have been addressed. 
Policy 7 – Historic Assets and Places of NPF4 intent is to protect and enhance
historic environment assets and places, and to enable positive change as a
catalyst for the regeneration of places. Policy 30 – The Sustainable Growth of
Renewables of LDP2 requires all applications for wind turbine developments to
be assessed against impacts on the historic environment, including scheduled
monuments, listed buildings and their settings. Policy 15 – Protection,
Conservation and Enhancement of Our Historic Environment, Policy 19 –
Scheduled Monuments, Policy 20 – Gardens and Designed Landscapes, and
Policy 21 – Sites of Archaeological Importance support the key policies and
Page 74

Page 75

provide guidance on assessing development proposals against heritage
impacts. 
13.2 Historic Environment Scotland (HES) - have advised the ECU that the proposed
wind farm would have an adverse impact on the setting of a number of
monuments (in particular Barguillean Farm, dun 250m SSW of (SM3930),
Dunstaffnage Castle (SM90120), Ardchattan Priory, priory, burial ground and
carved stones (SM13644), and the cluster of prehistoric burial monuments at the
south west end of Loch Nell including Dalineun, chambered cairn 265m S of
Dalaneas (SM4155). The severity of these impacts is, however, not such as to
result in an objection. Further, there are no designated assets for HES interests
within the boundary of the proposed development, so they are content that direct
impacts to historic environment impacts for their interests do not arise. In terms
of impacts on category A Listed Buildings, Gardens and Designed Landscapes,
HES are content with the assessment. Whilst the windfarm would be visible from
Ardchattan Priory (GDL00019), Achnacloich (GDL00007), Lochnell House
(LB4716), Ardmucknish Bay, Lochnell Observatory (St Margaret’s Tower)
(LB4717) and 1-4 Lochandu Cottages, Bonawe (LB52504), it would not alter
how the assets are understood, appreciated or experienced and there would not
be a significant impact on their cultural significance.      
13.3 West of Scotland Archaeology Service (WOSAS) – at the time of writing no
response has been received. It is recommended that any future consultation
response received by either the Planning Authority or sent direct to the ECU be
fully considered before a decision is made on the application.   
13.4 Having due regard to the above, subject to any condition(s) that may be
recommended by the West of Scotland Archaeology Service, it is
considered that the proposal is consistent with the provisions of Policy 11
– Energy and Policy 7 – Historic Assets and Places of NPF4, and Policies
30 – The Sustainable Growth of Renewables; 15 – Protection, Conservation
and Enhancement of Our Historic Environment; 19 – Scheduled
Monuments; 20 – Gardens and Designed Landscapes; and 21 – Sites of
Archaeological Importance of the ABLDP2.  
14. HYDROLOGY, THE WATER ENVIRONMENT AND FLOOD RISK  
14.1 Policy 11 – Energy of NPF4 requires that project design and mitigation
demonstrates how effects on hydrology, the water environment and flood risk
have been addressed. Policy 30 – Supporting the Sustainable Growth of
Renewables of LDP2 requires all applications for wind turbine developments to
be assessed against impacts arising from effects on hydrology, the water
environment and flood risk (including cumulative). Policy 55 - Flooding of LDP2
provides guidance on the type of development that will be permissible within
specific flood risk areas. Policy 57 – Risk Appraisals requires flood risk
assessments, and drainage impact assessments, to accompany applications
where required.  
14.2 The Council’s Flood Prevention Officer – has advised that they have no objection
subject to conditions to ensure that watercourse crossings are designed so there
is no reduction in pre-development channel cross sectional area ideally to pass
the 1 in 200 years plus climate change flood event; and that surface water
drainage is designed in accordance with CIRIA C753 and ensures that post
Page 75

Page 76

development runoff is attenuated to the 1 in 2 year greenfield runoff rate. The
surface water drainage should be in operation prior to the start of construction.    
14.3 Having due regard to the above, subject to the recommended conditions
it is concluded that the proposal is consistent with the provisions of Policy
11 – Energy of NPF 4, Policy 30 – The Sustainable Growth of Renewables,
Policy  55 – Flooding; and Policy 57 Risk Appraisals of ABLDP2.    
15. BIODIVERSITY    
15.1 Policy 11 – Energy of NPF4 requires that project design and mitigation
demonstrate how impacts on biodiversity, including birds have been addressed. 
Policy 3 – Biodiversity of NPF4 requires development proposals to protect
biodiversity, reverse biodiversity loss, deliver positive effects from development
and strengthen nature networks. Policy 5 – Soils of NPF4 supports the
generation of energy  from renewable sources that  optimises the contribution
of the area to GHG emissions reduction targets on peatland, carbon-rich soils,
and priority peatland. A detailed site-specific assessment will be required for
development on peatland which will include the net effects of the development
on climate emissions and loss of carbon. Policy 30 – The Sustainable Growth of
Renewables of LDP2  requires all applications for wind turbine developments to
be assessed against impacts arising from effects on the natural heritage,
including birds and to be assessed against impacts on carbon rich soils, using
the carbon calculator (including cumulative)  Policy  73 – Development Impact
on Habitats, Species and Biodiversity requires proposals to incorporate,
safeguard and enhance existing site biodiversity wherever possible. 
15.2 NatureScot have advised the ECU that the proposal does not raise issues of
national interest, however, in terms of biodiversity they summarise the key
considerations to be: 
• Significant impacts on Schedule 1 bird species and a regionally important black
grouse population, which are not considered to be easily overcome by siting,
design or other mitigation.  
15.3  Ornithology – NatureScot have advised that whilst the proposed impacts on
ornithological receptors do not raise issues of national interest, they do have a
number of concerns regarding the Proposal, namely: 
• This six turbine Proposal has a disproportionately high potential impact
for its size and as a small site there are significant concerns about
whether it could be built in compliance with the Wildlife and Countryside
Act (1981)(as amended) in relation to reckless offences based on the
submitted ES. 
• It has the potential to exclude golden eagles from 2-3% of a territory.
Whilst not at a level that would make the territory unviable, this is high
for such a small Proposal. Four out of the six turbines impact the eagle
territory. 
• It has potential to cause displacement/abandonment of black grouse lek
sites for what appears to be a regionally important population: we
consider all four leks sites connected. None of the leks sites have been
Page 76

Page 77

15.4 
15.5 
15.6 
suitably buffered. This is almost impossible to do without removal of T6
and T7 (Original proposed scheme sought advice on 8 turbines). 
• It has the potential to cause displacement of up to two pairs of hen
harrier. Not all nest sites have been suitably buffered. The lower end of
our recommended disturbance distance buffer has been used (300m)
and even then, turbines have been proposed within 300m; contradicting
statements in the ES that they have. 
Further to the submission of additional information from the applicant on
ornithology, NatureScot have responded on the 17/10/25 to advise: 
Hen Harrier 
The clarification around distance of nests to turbines is acknowledged. However,
due to likely interannual changes in nest site location the Applicant needs to
ensure they identify where the nests are pre and during construction as they
may have moved closer or further from turbine locations and require more
stringent mitigation. This will pose constraints during the construction phase, not
just operational, and therefore the Applicant should have plans to mitigate the
constraints. NatureScot reiterate the previous advice that the 750m buffer
around an active nest will be hard to implement without stopping construction or
operational maintenance in the breeding season. 
The discussion around mitigation and potential displacement of the hen harriers
needs to consider that they are listed on Schedules 1 and 1A of the Wildlife and
Countryside Act 1981 (WCA) which includes reckless harassment at any time of
year. There is an assumption that birds will relocate if disturbed and breed
elsewhere, however, there is no guarantee this will happen. It is for the Applicant
to be confident that their mitigation complies with the legislation. It is
recommended that a protection plan be put in place with backstops, to minimise
the risk of a WCA offence should mitigation not be adequate. 
Black Grouse 
Lek B's importance should not be understated, as the presence of a female bird
makes the lek important whether or not it has only been observed once during
the survey period. A satellite lek may only consist of one bird but this still needs
to be buffered the same as a main lek and is intentional lekking not opportunistic.
It is advised that works should be delayed until lekking has finished before
starting works each day. 
NatureScot support the additional preconstruction black grouse surveys that will
be carried out at the site; as regularity of use on these leks may have changed
since 2021/2022 and will inform mitigation more accurately. 
Golden Eagle 
NatureScot acknowledge the new range value and other inconsistencies that
have been corrected. They noted in their response of the 4 April 2025 that the
level of territory loss would not make the territory unviable. 
RSPB Scotland – have advised the ECU they do not have any comments to
make on the application. 
The Council’s Local Biodiversity Officer – considers there will be no likely
significant impact of residual impacts on any bird species, with proposed
mitigations outlined in the Bird Protection Plan (BPP) and oHMP in place. In
Page 77

Page 78

15.7 
15.8 
15.9 
15.10 
15.11 
15.12 
15.13 
15.14 
addition, welcomes the proposed appointment of an ECoW as part of a Bird
Protection Plan (BPP). 
Marsh Fritillary Butterflies - Although Marsh Fritillary were not located during the
Applicants survey work, Butterfly Conservation Scotland have identified
breeding Marsh Fritillary at the site. The Applicant may want to do further
assessment to consider impacts on the species. There is limited mitigation that
will balance the loss of suitable habitat; Marsh Fritillary require a network of
suitable habitat to support meta population dynamics. NatureScot note the
Applicant intends to implement a translocation project if required but there is no
further detail. 
Buglife Scotland – advise that it is welcomed that steps are being taken through
pre-construction surveys to avoid translocation of Marsh Fritillary. Further, they
reiterate the importance of surveys for Marsh Fritillary being undertaken to
inform the planning application, so all the available information is provided for
determination and to inform the mitigation strategy. 
Otter – NatureScot has advised that Otters are a feature of interest of Loch Etive
Woods SAC. In NatureScot’s view, it is unlikely that the Proposal will have a
significant effect on any otter, either directly or indirectly. An appropriate
assessment is therefore not required with regards to otter. Otter use of an area
can change over time so they should be included in pre-construction survey
work. 
Fish – The Argyll District Salmon Fishery Board (ADSFB) have advised that in
the event of the proposed wind farm being granted planning permission that
monitoring of Water quality, macroinvertebrates, and fish should be undertaken
to Scottish Government guidelines, which include sites within the reaches of
habitat in both catchments where salmon and sea trout are present. 
Bats - The Council’s Local Biodiversity Officer welcomes the proposed mitigation
measures, including pre-works surveys to be carried out by a qualified bat
ecologist and the production of a Species Protection Plan (SPP).   
Wood Ants – The Council’s Local Biodiversity Officer states that proposed
mitigation measures are welcomed, including pre-works surveys during their
active season (March to October), application of buffers where necessary,
translocation if necessary (following expert advice) and post translocation /
works monitoring. 
Other European Protected Species (EPS) – The Council’s Local Biodiversity
Officer notes that in terms of other EPS, no evidence was recorded, but suitable
habitat is present in and around the site for the following species: Amphibians,
Badger (Meles meles), Brown Hare (Lepus europaeus), Hedgehog (Erinaceus
europaeus), Marsh Fritillary (Euphydryas aurinia), Mountain Hare (Lepus
timidus), Pine Marten (Martes martes), Reptiles, Water Vole (Arvicola
amphibious), Wildcat (Felis silvestris silvestris) and Red Squirrel.   
No evidence or suitable habitat recorded on site for Great Crested Newts
(Triturus cristatus). 
Outline Construction Environmental Management Plan (oCEMP) - welcome the
inclusion of the plan, to include; Appointment of an ECoW; Provision of Toolbox
Page 78

Page 79

15.15
talks to all construction staff and contractors; to be adhered to throughout the
lifetime of the proposed development. 
Groundwater Dependent Terrestrial Ecosystems (GWDTE)   
15.16
SEPA - note some small areas of moderately dependent habitat will be impacted
by the development, however, agree that these habitats are mostly rain/surface
water fed. The mitigation currently suggested around these habitats in Section
5.1 of Appendix 9.3 - Groundwater-Dependent Terrestrial Ecosystems
Assessment and further use of floating roads should be sufficient to minimise
any further impacts. SEPA request these mitigation measures are secured by
condition. 
Peat 
SEPA initially submitted a holding objection to the ECU in relation to a lack of
information on impacts on peat and suggested a number of modifications in
relation to peat and turbine/track siting. SEPA requested a number of
modifications to the infrastructure layout, including relocation of access tracks,
which may reduce the number of watercourse crossings which would support
the mitigation hierarchy of avoidance as the first principle. SEPA also advised
that the Figures showing Peat Depth (Figures 9.1.6a-f) are difficult to assess due
to blocking out of information with peat depth numbers which have a white
background. Following the submission of further information, responding to
SEPA’s latest request to relocate or microsite turbines / access tracks / turbine
infrastructure / substation/BESS/construction compound off areas of peat, and
move a watercourse crossing off an area of deepest peat, SEPA has withdrawn
their original objection to the proposals, subject to relevant conditions being
attached to any approval.  
15.17 Peat Landslide Hazard Risk Assessment   
15.18 
Ironside Farrar - advised the ECU the following in a Stage 1 Checking Report: 
The PLHRA requires resubmission there are significant shortcoming throughout
the PLHRA and reworking of the PLHRA report is required to support a robust
assessment; areas for attention will be advised in the review findings and outline
guidance offered to support the developer in preparing a satisfactory PLHRA. 
The reporting is considered to be generally well reasoned and to use appropriate
assessment techniques. A number of queries are raised however, significant
issues are considered to be the relative lack of probing when compared with
published guidance at infrastructure locations and the omission of the
SSSI/areas of SAC that run along the northern boundary from consequence and
risk assessment sections. This latter issue has the potential to significantly
change the conclusions of the report in the area. 
Additional information has been provided to Ironside Farrar to seek to address
the various queries arising from their Stage 1 Checking Report. The ECU had
advised that Ironside Farrar would be seeking to provide a Stage 2 Report to
them by 19/12/25, however, to date this information has not been provided. The
Council is therefore unable at this time to come to any conclusions on the
potential for peat slide at the site.   
Argyll and Bute Council OBJECTS to the proposal on the grounds that
there are unresolved issues in relation to impacts on peat, contrary to the
provisions of NPF4 Policies 5 and 11, and LDP2 Policies 30 and 79, and it
Page 79

Page 80

is not possible to reach a conclusion on the proposal's acceptability in this
regard at this time.  NOTE - If these matters are resolved to the satisfaction
of the ECU, Argyll & Bute Council will withdraw this objection.  Should the
objection remain unresolved, and the proposal progresses to Public
Inquiry, Argyll & Bute Council would defer to SEPA and NatureScot.  
16. TREES, WOODS, AND FORESTS  
16.1 
16.2
Policy 11 – Energy of NPF4 requires that project design and mitigation will
demonstrate  how impacts on trees, woods and forests have been addressed.
Policy 6 – Forestry, woodland, and Trees of NPF4 intent is to protect and expand
forests, woodland, and trees. Policy 77 – Forestry, Woodland, and Trees of
LDP2 states that there is a strong presumption in favour of protecting our
woodland resources. Policy 78 – Woodland Removal of LDP2 states that
proposals that would involve the removal of woodland resources will be
assessed against the criteria for determining the acceptability of woodland
removal, in accordance with the Scottish Government’s Control of Woodland
Removal Policy. Where this assessment concludes that compensatory planting
would be appropriate, developers will need to provide for this in accordance with
the advice in the Scottish Government’s Control of Woodland Removal Policy. 
The applicant has advised that the construction phase has the potential to result
in changes to the physical structure of the existing forestry within the Application
Boundary, as well as forestry waste arising from the Proposed Development.
The majority of the proposed infrastructure is located outside of existing
woodlands; however, access for the Proposed Development is taken via
commercial forestry plantations. 
The Forestry Study Area extends to 18.1 hectares (ha), excluding existing open
ground. Felling would be advanced on 18.1ha for construction of the Proposed
Development. There would be 6.8ha of woodland restocked in line with the aims
of the Taynuilt Land Management Plan. There would be a loss of woodland
totalling 11.3 ha due to the access track. 
In order to comply with the Scottish Government's Control of Woodland Removal
Policy, compensation planting would be required to mitigate for the loss of
woodland area. The Applicant is committed to providing appropriate
compensatory planting. The extent, location and composition of such planting to
be agreed with Scottish Forestry, taking into account any revision to the felling
and restocking plans prior to the commencement of construction.  
16.3  NatureScot : Loch Etive Woods Special Area of Conservation (SAC) – have
advised that the Proposal is immediately adjacent to Loch Etive Special Area of
Conservation (SAC) designated for its alder woodland on floodplains, mixed
woodland on base-rich soils associated with rocky slopes, western acidic oak
woodland and otter (Lutra lutra). In NatureScot’s view, this Proposal is likely to
have a significant effect on mixed woodland on base-rich soils associated with
rocky slopes of Loch Etive Woods SAC. Provided an appropriate Construction
Environmental Management Plan is developed and adhered to, there will be no
adverse effect on site integrity on the woodland qualifying features of Loch Etive
Woods SAC. Based on the information provided, the conclusion of NatureScot
is that the Proposal will not adversely affect the integrity of the site. 
Page 80

Page 81

16.4  Scottish Forestry - initially advised the ECU that they note that the woodland
impacts are associated with the access track, widening and extending to the
development. They recognise that the proposed woodland removal is small with
limited impacts. However, the woodland types are important and advise that: 
• A PAWS and native woodland (Dailnamac) plan should be provided
which quantifies the area of PAWS lost to the development and proposes
compensatory planting in exceedance of the area lost. 
• Compensatory planting should be secured by a planning condition. 
In a further response they requested the following further amendments and
information from the applicant: 
• The proposals should demonstrate full compliance with UKFS
• Felling and Restocking should be considered in the context of the Argyll
and Bute Local Development Plan 2 and associated policies on Forestry
and Forestry Removal in line with the adopted Forest and Woodland
Strategy
• Clarification of the total area of permanent woodland loss
• Compensatory planting for the woodland lost should be secured by
condition. 
The ECU have asked the applicant to review this response and confirm a
timeframe for addressing the points raised. In response, the applicant has now
provided all relevant information to Scottish Forestry, who in turn have confirmed
that all issues are now resolved.    
16.5 Having due regard to the above the Council is able to conclude that in
terms of impacts on woodland, the proposal is consistent with the
provisions of Policies 11 – Energy and 6 – Forestry, woodland and Trees
of NPF4, and Policies 30 – The Sustainable Growth of Renewables; 77 –
Forestry, Woodland and Trees and 78 – Woodland Removal of the LDP2. 
17. MINERALS  
17.1 Policy 33 – Minerals of NPF4 states that development proposals for borrow pits
will only be supported where: the proposal is tied to a specific project and is time-
limited; the proposal complies with the mineral extraction criteria in Policy 33
taking into account the temporary nature of the development; and appropriate
restoration proposals are enforceable and Policy 31 – Minerals of LDP2 states
that proposals for mineral extraction will generally be supported for borrow pits
where the proposal is found to be acceptable after being assessed against
National Planning Framework 4 Policy 33 criterion e).  
17.2 It is the intention to source aggregate for the construction of site access tracks,
crane hardstanding areas, foundations and upgrades of existing forestry tracks
from the on-site borrow pits, rather than an off-site quarry, which has the
advantage of reducing the number of Heavy Goods Vehicles (HGV) on public
roads. Two borrow pits have been identified on the site. 
17.3 Having due regard to the above taking into account that the proposed
borrow pit is tied to the proposal it is concluded that the proposal is
Page 81

Page 82

consistent with the provisions of Policy 33 – Minerals of NPF4 and Policy
31 – Minerals of the  ABLDP2 in this regard, subject to a condition to
secure details of the borrow pits and a borrow pit restoration plan.  
18. DECOMMISSIONING, SITE RESTORATION AND QUALITY OF SITE
RESTORATION PLANS    
18.1 Policy 11 – Energy of NPF4 requires that project design and mitigation
demonstrate how proposals for the decommissioning of developments, including
ancillary infrastructure, and site restoration have been addressed. It also
requires that project design and mitigation demonstrate how the quality of site
restoration plans have been addressed including the measures in place to
safeguard or guarantee availability of finances to effectively implement those
plans. Policy 30 – The Sustainable Growth of Renewables of the LDP2 requires
consideration to be given to the long-term environmental management of the
site.    
18.2 The proposal would have an operational life of up to 50 years from the date of
commissioning. At the end of the operational period, it would be
decommissioned and  the turbines and electrical equipment dismantled and
removed. Any alternative to this action would be subject to a further consenting
process.  
18.3 Decommissioning would involve the removal of all above-ground infrastructure,
including the dismantling and removal of the wind turbines and electrical
equipment; reinstatement/covering of the turbine areas and associated
hardstanding; and; demolition and removal of the substation and control
building. The electrical cables will also be left in situ, once de-energised. Overall,
it is estimated that the decommissioning period would be 12 months. It is
recommended that this matter is covered by planning conditions consistent with
other projects across Argyll & Bute in the event that the proposal obtains consent
from the ECU.    
18.4 Having due regard to the above it is concluded that subject to an
appropriate condition being attached if the proposal receives consent the
proposal is consistent with the provisions of Policy 11 – Energy of NPF4
and Policy 30 - The  Sustainable Growth of Renewables of the LDP2  
19. CUMULATIVE IMPACTS  
19.1 Policy 11 – Energy of NPF4 requires that project design and mitigation will
demonstrate  how cumulative impacts have been addressed. Policy 30 – The
Sustainable Growth of Renewables of the LDP2 also requires cumulative
impacts to be addressed. Any cumulative impacts which have been identified
are covered in the preceding sections of this report.  
20. RENEWABLE ENERGY GENERATION TARGETS AND GREENHOUSE GAS
EMISSIONS  REDUCTION TARGETS.    
20.1 Policy 11 – Energy of NPF4 requires that, in considering the impacts of the
proposal, significant weight will be placed on the contribution of the proposal to
renewable energy generation targets and on greenhouse gas emissions
reduction targets. Policy 1 – Tackling the climate and nature crises of NPF4
Page 82

Page 83

requires that  when considering all development proposals significant weight
will be given to the global climate and nature crises. Policy 30 – The Sustainable
Growth of Renewables of LDP2 require all renewable developments to be
assessed against the scale of contribution to renewable energy generation
targets and greenhouse gas emissions.    
20.2 Renewable Energy Generation Targets - The proposal would consist of up to 6
wind turbines, each with a rated capacity of approximately 7.2 MW (based on
candidate turbine), therefore the overall installed capacity of the wind farm would
be approximately 45 MW, as well as including up to 20 MW of storage capacity
with a Battery Energy Storage System (BESS), which could contribute to the
Scottish Governments minimum targets for having 20GW of onshore wind
operational by 2030.    
20.3 Greenhouse Gas Emissions Reduction Targets -. The Proposed Development
would  result in the production of approximately 7500 GWh over its operational
lifetime of 50 years), displacing approximately 3,200,000 tonnes of fossil-fuel
mix generation equivalent carbon dioxide (CO2) emissions, and therefore
causing a positive environmental effect. Over this time, the carbon dioxide
emissions of the proposal are cancelled out by the carbon savings, and through
the rest of the operational period would result in a net saving of carbon dioxide
emissions, thereby mitigating climate change.  
20.4 Having due regard to the above it is considered that the proposal is
consistent with the provisions of Policies 1 – Tackling the climate and
nature crisis and 11  – Energy of NPF 4, and Policies 30 – The Sustainable
Growth of Renewables and 04 – Sustainable Development of LDP2  
21. GRID CAPACITY & ENERGY STORAGE    
21.1 Policy 11 – Energy of NPF4 requires that grid capacity should not constrain
renewable energy development. It is for developers to agree connections to the
grid with the relevant network operator. Furthermore, that development
proposals for all forms of renewable, low-carbon and zero emissions
technologies will be supported, which include energy storage. Policy 30 – The
Sustainable Growth of Renewables of LDP2 requires the Council to have regard
to the opportunities for energy storage.    
21.2 Grid Capacity - Connection to Electricity Grid - The grid connection would be to
the existing Taynuilt substation, which is located approximately 6.7km to the east
of the proposed on-site substation. The grid connection does not form part of
this Application and would be subject to a future application, subject to the
development receiving consent.    
21.3 Energy storage – The project will have a Battery Energy Storage System (BESS)
with a capacity of up to 20 MW as part of the development. This would be located
within the footprint of the substation compound. The maximum export capacity
of the BESS would be approximately 20MW/40MWh.  The BESS would
comprise of the following: 
• Battery Storage Units (BSU);
• Power conversion system units;
• Switchgear units; and
Page 83

Page 84

• Control Buildings. 
Each BSU will be delivered to the site prefabricated, contained within a steel
container, similar in size and appearance to a standard shipping container with
a maximum size of approximately 8m x 2m.  
This facility will be able to store excess power generated by the wind farm and
release the power on to the grid when the wind drops. Inclusion of a battery
within the scheme increases the sustainability of the power generated. Energy
storage enables renewable integration, helps to balance supply and demand,
and enhances the security of supply.  
21.4 Having due regard to the above it is considered that the proposal is
consistent with the provisions of Policy 11 – Energy of NPF 4, and Policy
30 – The Sustainable Growth of Renewables of the ABLDP2 in respect to
Grid Capacity and Energy Storage.  
22. PERPETUITY    
22.1 Policy 11 – Energy of NPF4 requires that consents for proposals may be time
limited. Areas identified for wind farms are, however, expected to be suitable for
use in perpetuity. It is acknowledged that areas identified for wind farms are
expected to be suitable for use in perpetuity. However, as the expected
operational life of the proposal is 50 years from the date of commissioning,
should consent be granted, Officers would expect it to be time limited to 50 years
to reflect the life of the wind farm as detailed in the EIAR.  
23. CONCLUSION   
23.1 This proposal is classed as “Strategic Renewable Electricity Generation” - a
National Development, in terms of the Spatial Strategy given its capacity to
generate and  store more than 50MW. In principle, there is support for this scale
of development, given its importance in the delivery of Scotland’s Spatial
Strategy. However, such projects are still required to be assessed against the
provisions of the Development Plan, which now consists of National Planning
Framework 4 and the  Argyll & Bute Local Development Plan 2.  
23.2 The lead Development Plan policies support renewable energy development in
principle but require that proposals be assessed against the criterion detailed in
this report. While the weight to be given to each of the considerations is a matter
for the  decision maker, NPF4 is clear that significant weight will require to be
placed on the contribution of the proposal to renewable energy generation
targets and on greenhouse gas emission reduction targets. However, a balance
still requires to be reached in terms of the impact of the development.    
23.3 In relation to landscape and visual impacts NPF4 advises that where impacts
are localised and/or appropriate design mitigation has been applied such effects
will be considered acceptable. However, NPF4 must be read as a whole, and
detailed consideration given to linked policies. Policy 4 (Natural Places) – sets
out that development proposals which by virtue of type, location or scale will
have an unacceptable impact on the natural environment will not be supported.
Following a detailed assessment of this application, it is considered that as this
Page 84

Page 85

proposal would have a significant landscape and visual impact, it warrants an
objection from the Council in this regard. 
23.4 
23.5 
In relation to impacts on peat, NPF4 Policy 5 – Soils states that ‘Where
development on peatland, carbon-rich soils or priority peatland habitat is
proposed, a detailed site specific assessment will be required’. In addition,
Policies 30 and 79 of the ABLDP2 seek to assess applications against their
impacts on carbon rich soils, advising that development that would potentially
have a significant adverse effect on peat structure and function will not be
supported. As there are unresolved issues in relation to impacts on peat, in
relation to the contents of the Peat Landslide Hazard Risk Assessment, as set
out above, it is recommended  that the Council objects to the proposal on the
grounds that it is not possible to reach a conclusion on the proposal's
acceptability in this regard at this time. 
The Scottish Government gives considerable commitment to renewable energy
and encourages Planning Authorities to support the development of wind farms
where they can operate successfully in appropriate locations. This is not
however blanket support without qualification. In considering the
appropriateness of the development, significant weight has been given to these
matters. 
23.6 In conclusion, it is recommended by Officers that the Council formally objects to
this proposal.  Prior to reaching a decision the Energy Consents Unit should
consider the suggested mitigation measures recommended by the Council’s
Consultant Landscape Architect and the responses that may be received from
the various outstanding consultees. Any conditions recommended by consultees
should be included in any consent granted by Scottish Ministers. 
24. RECOMMENDATION 
That the ECU be notified accordingly that: 
(1) Argyll and Bute Council object to the proposal on landscape and visual
grounds, as the proposed wind farm would result in significant adverse
landscape and visual effects, contrary to NPF4 Policy 11 and LDP2 Policy 30.  
(2) Peat Landslide Hazard Risk Assessment - Argyll & Bute Council has been
unable to reach a conclusion in respect to the Peat Landslide Hazard Risk
Assessment (NPF4 Policies 5 and 11 and LDP2 30 and 79) as no response has
been provided by Ironside Farrar on the further information provided by the
Applicant.  Argyll and Bute Council OBJECT unless this issue is resolved to the
satisfaction of Ironside Farrar prior to the determination of this application by the
ECU.  Should this issue not be resolved the Council would defer to Ironside Farrar
(or any other body appointed by the ECU to provide expert guidance on this matter)
in the event of a PLI. 
(3) Archaeological Impact - Argyll & Bute Council has been unable to reach a
conclusion within the time afforded in respect to Archaeological Impact as
no response has been received from the West of Scotland Archaeology Service. 
Argyll and Bute Council are therefore not in a position to confirm whether the
proposal is consistent with the relevant provisions of NPF4 Policy 7 and LDP2
Page 85

Page 86

Policy 21 and would recommend that the ECU consider these matters prior to
determination. 
(4) Argyll and Bute do not object on noise impact grounds, subject to the
inclusion of an Operational Noise Planning Condition, as recommended by
the Council’s Noise Consultant, Mott MacDonald, specified in their Review of
Evidence – Noise, dated March 2025. 
(5) Argyll and Bute Council do not object on Public Access grounds, subject to
the inclusion of a condition requiring the developer to prepare an Access
Plan for approval by the Council prior to the commencement of construction. 
(6) Argyll and Bute Council do not object on Roads grounds, subject to the
inclusion of relevant conditions, as specified by Transport Scotland in their
consultation response to the ECU dated 04/02/25. 
(7) Argyll and Bute Council requests that the recommendations of the Council’s
Local Biodiversity Officer are considered by the ECU, including: 
Recommend that the applicant continue discussions with NatureScot and SEPA to
ensure best practice for peat extraction and restoration. 
While the impact to bats is unlikely to be significant, it would be advisable to monitor
any fatalities that may occur from collision as they are found to forage within the
wind turbine areas. This information will feed into mitigation measures which can
be altered accordingly, to ensure any negative impacts to foraging / commuting
bats is minimal. 
Recommend that due to the presence of black grouse in the area, the applicant
should ensure the fences are clearly marked and that a programme of monitoring
fences for any potential black grouse carcasses is implemented 
Recommend that the applicant continues discussions with relevant organisations,
to ensure that appropriate mitigation and enhancement measures are adhered to
and potential impacts are minimal.   
(8) Ornithology: Whilst NatureScot has not objected to this issue, it is noted that
they consider the proposed development may result in significant impacts
on Schedule 1 bird species and a regionally important black grouse
population. It is recommended that the ECU gives further consideration to
this issue before determining the application. 
(9) Argyll & Bute Council requests that all other conditions recommended by
consultees are included in any Consent. 
Page 86

Page 87

© Crown Copyright and database right 2025
All rights reserved. OS license (customer) account number AC0000849384
Location Plan Relative to: 24/02242/S36
O
0 720 1,440360 Meters
Application Site
Legend
Countryside Area
Greenbelt
Remote
Countryside Area
Settlement Area
Page 87

Page 88

This page is intentionally left blank

Page 89

Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle 
Reference No: 25/00181/PP
Planning Hierarchy: Local Application
Applicant: Mr and Mrs Scott Raeburn
Proposal: Erection of Tearoom with 4 Apartments on Upper Floors
Site Address:  Former Susy's Tearoom, Tighnabruaich   
DECISION ROUTE 
☐Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
☒Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission 
• Erection of restaurant with 4 apartments on upper floors
• Installation of bio disc treatment plant with connection to existing outfall pipe
• Formation of vehicular access from public car parking area
• Formation of five on-site parking spaces 
(ii) Other specified operations 
• Connection to public water supply 
(B) RECOMMENDATION: 
Having due regard to the Development Plan and all other material considerations, it
is recommended that Planning Permission be granted as a minor departure to
Development Plan Policy and subject to the conditions, reasons and advisory notes
appended to this report. 
(C) CONSULTATIONS:   
Environmental Health Service (memoranda dated 18th February 2025 and 8th April
2025) 
No objections subject to conditions and advisory notes relating to food and health
legislation; external lighting; control of construction activities and noise; control of
operational activities, noise and cooking odours; commercial waste; and contaminated
land.
Page 89 Agenda Item 5

Page 90

Scottish Water (letter dated 20th February 2025) 
There are no objections to the proposal – there is currently sufficient capacity in the
Tighnabruaich Water Treatment Works to service the development. However, please
note that further investigations may require to be carried out once a formal application
has been submitted to Scottish Water. 
According to their records, there is no public wastewater infrastructure in the vicinity
of the proposed development and, therefore, the applicant is advised to investigate
private treatment options. 
Scottish Environment Protection Agency (e-mail dated 25th February 2025)   
It is noted that the site is well elevated above the 1 in 200-year flood level plus climate
change uplift with an allowance for freeboard. As such, there are no objections to the
proposal on flood risk grounds. 
It is also noted that investigations have identified that asbestos fragments and
asbestos contaminated soils are present on the site. Any persons involved in the
removal of asbestos construction and demolition waste or waste soils from the site
must ensure it is characterised and consigned to an appropriately permitted or
licensed facility in accordance with their Duty of Care and relevant waste management
legislation. Any proposal to treat waste soils on site is likely to require a waste
management licence. 
There is a Scottish Water sewerage network pumping station within approximately
115 metres of the development site. As per SEPA’s standing advice on wastewater
drainage, "Sites of all scales, and particularly trade sites, should be required to
connect to the public sewer unless evidence is provided to the satisfaction of the
Planning Authority that this would not be viable. At the discretion of the Planning
Authority, the applicant may also be required to actively engage with Scottish Water
to seek growth provision/adoption of the scheme." 
For information, the Kyles of Bute is a designated Shellfish Water Protected Area
(SWPA) and any discharge will require appropriate treatment and authorisation under
the Water Environment (Controlled Activities) (Scotland) Regulation 2011 (as
amended). The planning application makes reference to the discharge of treated
effluent to sea using legacy pipework but no detail is provided. Any new discharge will
require to be through a constructed and adequately maintained sea outfall to a location
below mean low water springs (MLWS). 
JBA Consulting Ltd – Flood Risk Assessor (report dated 25th February 2025) 
The site lies outwith the indicative limits of fluvial and surface water flooding, as per
the SEPA Future Flood Maps. The coastal flood extent overlaps marginally with the
southern region of the site. With reference to the Coastal Flood Boundary dataset, the
200 year still water level is 3.97 mAOD. Including an additional 0.86m allowance for
climate change and a further 0.6m freeboard, Finished Floor Levels for the building
should be set to a minimum of 5.43 mAOD. With reference to the site plan, it is evident
that the proposed site sits at an elevation above 6.5 mAOD; hence, this is acceptable. 
Page 90

Page 91

Area Roads Engineer (report dated 25th March 2025 and 15th November 2025)  
The layout as initially submitted identified the provision of six on-site parking spaces
and this was considered to be unacceptable on the grounds that this number of spaces
was insufficient to serve the four flats, the patrons of the tearoom and the staff.
Additionally, the on-site spaces were to be accessed individually from the Council car
park thus preventing the use of each directly adjoining space within the car park and
this was not considered to be an acceptable arrangement. 
An amended site layout was received during the processing of the application, which
showed the creation of a single access and egress point and the provision of five on-
site parking spaces. The Area Roads Engineer objected to this arrangement as it
continued to be lacking in the appropriate number of spaces. 
(D) HISTORY:   
Planning Permissions 98/01657/DET, 04/01680/DET and 08/02143/DET were
approved on 05.02.2019, 08.10.2004 and 29.01.2009 respectively for the retention of
a static caravan at the application site. 
Planning Permission (ref:  22/00223/PP) was refused on 5th February 2024 for the
erection of a restaurant with 4 flats above; a separate building to the rear incorporating
three staff studios; and the installation of a bio disc sewage treatment plant. 
(E) PUBLICITY: 
Neighbour notification (closing date: 28.02.2025) and advertised under
Regulation 20 Advert (closing date: 14.03.2025) 
(F) REPRESENTATIONS:   
(i) Objections have been received from the following five sources: 
Paul Paterson, 2 Manor Way, Tighnabruaich (comments received on
07.02.2025, 15.05.2025, 03.07.2025 and 15.09.2025) 
Mrs Christine Paton, Lochee House, Tighnabruaich (comments received on
03.03.2025, 09.03.2025 and 12.03.2025) 
Lloyd Jones, LRJ Planning, Pen-y-Rhiw, Newport on behalf of Alexander
Malcolm, The Firs, Tighnabruaich (letters dated 19.02.2025 and 04.03 2025) 
Heather Whyte, Roseville, Tighnabruaich (comments on received 03.03.2025) 
Thomas Whyte, Roseville, Tighnabruaich (comments on received 03.03.2025) 
Mr John Paton, Lochee House, Tighnabruaich (comments received on
05.03.2025, 09.03.2025 and 12.03.2025) 
(ii) Summary of issues raised: 
Page 91

Page 92

Design, Scale and Massing 
A summary of the key points submitted by objectors: 
• The length, breadth and height of the proposed building are considered
to be excessive and out of proportion to the previous tearoom 
• The overall design is considered to lack any credible reasoning,
planning, living and functional sense 
• The design style is not in keeping with the surrounding buildings and
would look out of place in the typical West Highland architecture of the
area, which is stone built, pitched roof and appropriate glazing. It would
appear alien and contrived within the street scene 
• The proposal fails to respect the simple form, design and character of
surrounding development 
• The current proposal is materially more intrusive, visually dominant and
harmful than the previous scheme that was refused in February 2024 
• There is minimal separation distance off the boundaries and the
development fills the whole site, resulting in a cramped form of
development that is not in keeping with the settlement pattern 
Officer response: These issues are addressed in the assessment contained
in Section P and Appendix A below. 
Parking and Road Safety 
There are a number of objectors that are concerned about parking provision
and general road safety. A summary of the key points includes: 
• The proposal would generate parking from customers/patrons, staff and
holiday letting patrons and the scheme does not provide a sufficient
number of spaces within the site boundary 
• The plans do not illustrate how cars and delivery vehicles can access,
park and turn safely within the site 
• There are no disabled parking spaces for patrons and the proposal is
based on use of the Argyll and Bute Council owned public car and coach
park 
• The adjacent car park is busy during tourist season and this will lead to
parking overspilling on to the road and increase conflict with cars and
pedestrians 
• Assuming that coaches still use the car park, a significant percentage
of capacity for cars (perhaps 30%) would be needed for the residential
element of this development. It would also not be in the public interest
for eight to twelve spaces to be used on a permanent basis for a private
developer 
Page 92

Page 93

• The car park has an overnight parking restriction so cars from overnight
guests could not use the car park. If the restriction was lifted then it
could create an issue with motorhome parking 
• The car park will not support increase in demand (in their opinion) in its
current unmaintained state and will suffer further disrepair due to the
additional traffic and use by construction traffic 
• In the past residential use has been ruled out (see 98/01657/DET) when
a caravan was refused permission as it did not have a separate
curtilage, access and parking arrangements 
• Concern is expressed that the rear of the proposed development would
encroach onto the driveway and access to the properties to the sides of
the development site in addition to causing great difficulty with access
to the local authority recycling area and coach park. It would also be
highly susceptible to creating dangers for other traffic flow from vehicles
and that of public access and right of way 
• The car park is a turning point for regular coaches visiting the area and,
if difficulties in turning are created as a result of the proposal, there is
concern that this could result in the potential loss of much needed
tourism to the area 
Officer response: These issues are addressed in the assessment contained
in Section P and Appendix A below. 
Residential Amenity - Overlooking/Loss of Daylight 
A number of objectors including direct neighbours, have raised issues of
overlooking, loss of daylight and impact on privacy. Key points: 
• Concern is expressed that the proposed building, by virtue of its large
size and shape, would significantly reduce the amount of light to other
properties in the area. A daylight and sunlight assessment has not been
provided 
• Concern is expressed that the second floor with balconies would look
into next door neighbours and would be over-intrusive looking out onto
the public walkway and coach park 
• It is understood that the building has risen from 0.8m above the ridge of
Roseville to the west to 1.2m and this has increased concerns of the
existing dwellinghouse being overshadowed by this new higher
structure 
• Concern is expressed that the second tier appears to sit further beyond
Roseville than the original single-storey tearoom and would be higher.
It is contended that this would block even more light into this property
and would potentially increase its energy bills 
• The height and location of the rear section of the plans raises concerns
for the owners of Roseville with regards to privacy as the holiday
Page 93

Page 94

apartments would have full views into their garden where their two
children play 
• There would appear to be a side window overlooking Roseville and, if
the balconies were to be open-sided, then privacy becomes a factor. 
Officer response: These issues are addressed in the assessment contained
in Section P and Appendix A below. 
Residential Amenity – Noise, Disturbance and Odour 
A number of objectors, including direct neighbours, have raised issues of noise,
odour and disturbance from cooking smells; the proximity of the stainless-steel
flue pipe to the bedroom windows of the adjoining dwelling; and the significant
number of people coming and going, including deliveries early in the morning. 
Concern is expressed that the intention to operate the proposed development
during the day, evening and night would create a noise pollution infringement.
There is no disclosure of operating hours, times and allowances regarding cut
off periods, etc. 
The title deeds specifically rule out the sale of alcohol on the land but there
would be scope for ‘Bring-Your-Own-Bottle’ events which may result in noise
and antisocial behaviours. Limits on opening hours would, however, help to
address this. 
Officer response: These issues are addressed in the assessment contained
in Section P and Appendix A below. 
Foul Drainage and Water Supply 
Concern is expressed that the application fails to show any means and
methods of wastewater treatment and the mention of a bio disc system means
nothing without details of the type, designs, risks, plans, etc. It is contended
that it is unlawful to discharge into the sea. Certain discharges of sewage from
non-domestic premises constitute trade effluent in terms of the Sewage
Scotland Act and other acts that pertain to sewage and discharging into the
sea. 
The proposed development mentions connecting onto neighbouring properties
and it is queried how a study and research have been done to make such plans. 
If the connection to the public water main requires to be laid through land
outwith the application site, the developer must provide evidence of formal
approval from the affected landowner(s) by way of a deed of servitude. As the
proposed development would require formal approval from the nearest
neighbours as well as from Argyll and Bute Council who own the car/coach
park next to this development, there is a lack of evidence and authority that the
developer has such permissions. 
Officer response: These issues are addressed in the assessment contained
in Section P and Appendix A below. 
Page 94

Page 95

Contaminated Land 
It is contended that the previous tearoom building on the site contained
asbestos and it is alleged that the burning of asbestos and other combustible
material was associated with the demolition of this structure. 
It is also contended that the landowner has so far not provided certificates
demonstrating the correct disposal of asbestos from the site and fact-based
evidence of appropriate ground soil works.  
There is no contaminated land survey submitted by the applicant. 
Officer response: This issue is addressed in the assessment contained in
Section P and Appendix A below.  
Biodiversity 
There are concerns about biodiversity and that there have been no ecological
surveys. There are no plans to enhance biodiversity given there is no room for
landscaping. 
The proposed development lacks any biodiversity plans, wildlife and plant
assessments and environmental assessments.   
Officer response: This issue is addressed in the assessment contained in
Section P and Appendix A below. 
Waste 
Concern is expressed that there is an absence of allocated space for waste
storage, particularly given the identified capacity of the proposed facility
(seventy covers) and the likely significant amount of waste that would be
generated. 
Officer response: This issue is addressed in the assessment contained in
Section P and Appendix A below. 
Legal Issues 
Concern is expressed that the northernmost boundary of the application site
has been drawn beyond the land belonging to the tearoom as shown in its title
deeds. 
Mention is made of the potential existence of burdens on the land referred to
as Susy's Tearoom (ref: ARG15953). It is not known whether these burdens
continue and whether they are still legally binding. Various burdens are referred
to that it is contended would affect the ability of the proposed premises to
operate: the north side and east side of the land have to be fenced off; any
building has to have the approval of the person that originally sold the land or
their successors; any building should not be a nuisance or hurtful to the amenity
of the land and neighbours; and the sale of alcohol or fish and/or chips is
prohibited. 
It is mentioned that the title deeds make no reference to access rights to the
site and it is possible that rights of access over the Council-owned car park may
Page 95

Page 96

have lapsed as a result of the passage of time (approximately seven years)
since a business has operated on the site. It is suggested that time be given to
allow for a closer look at this issue and its potential implications regarding this
application and its lawfulness. 
Officer response: These issues are essentially legal in nature and are not
considered to have a material bearing upon the Planning aspects of the case. 
Electricity Substation 
A substation sits behind the application site and it is contended that the impact
on the stability of the substation foundation and access to the structure
(including safety risks, assessments, etc.) may need to be addressed. There
is no mention of how the noise from the substation may affect the users of the
development. 
Officer response: The potential impact of the proposed development on the
stability of the substation foundation is an issue that would more appropriately
be investigated between the applicant/developer and Scottish and Southern
Electricity. 
The second issue is one that was raised at another site in Tighnabruaich in
relation to the erection of a dwellinghouse adjacent to an existing substation
(application refs: 11/01978/PP and 15/00295/PP). 
In that instance, a condition was attached that involved an identification of the
noise levels generated by the operation of the sub-station together with an
assessment of whether the noise was likely to give rise to complaints given the
nature of the proposal. Any remedial measures that were deemed necessary
would then be formulated and this is considered to be an appropriate means
of addressing this issue in respect of the current proposal. 
Disabled Access/Facilities 
The proposal does not show how disabled people will gain access in and out
of the building and to the proposed letting properties. Their indoor layout does
not show a disabled toilet. 
Officer response: Internal layout and design is not a Planning matter and
would be dealt with under the Building Warrant process. The outside provision
of disabled parking bays and access to the building are addressed in the
assessment contained in Section P and Appendix A below. 
Fire Escapes 
It is contended that there is a lack of fire escapes for those who will be in the
second and third floor levels. 
Officer response: This issue would be dealt with under the Building Warrant
process. 
Lack of Need 
Concern is expressed that Tighnabruaich has enough catering/drinking
establishments without adding more.
Page 96

Page 97

Officer response: The issue of the lack of need for a development does not
have a material bearing upon the Planning aspects of the case. 
Storage of Boat 
The applicant has placed a boat under a fixed cover on part of the application
site with the intention of carrying out repairs. This is considered to breach the
requirements for any fixture being in-situ without official planning permission
and local authority permission. It is contended that the owner/occupier must
remove this boat building project with urgency as its ongoing presence would
cause an unsightly mess, an obstruction to road users and to neighbours, a
breach of health & safety and a hindrance to gaining access for soil samples
to be taken for the said planning application. 
Officer response: This matter is being investigated separately and it is not
considered to have a material bearing upon the Planning aspects of the current
application. 
Construction Compound 
If permission for the proposed building was to be granted, it is contended that
builders, their equipment and vehicles would be placed and parked within the
public car and coach park, which it is considered would be unlawful and would
breach the planning and parking regulations. It is questioned whether the Local
Authority would be willing to give up and sacrifice all of the coach park, bottle
bank, substation and neighbour rear parking areas for these purposes. 
Officer response: This matter is not considered to have a material bearing
upon the Planning aspects of the current application. There are certain
circumstances where a compound for the duration of the construction period
does not require Planning Permission and the use of land that is not in the
ownership of the applicant/developer for this purpose would require negotiation
between the relevant parties. 
Representations from the public are published in full on the planning application file
and are available to view via the Public Access section of the Council’s website. 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report ☐Yes ☒No 
(ii) An Appropriate Assessment under the Conservation
(Natural Habitats) Regulations 1994
☐Yes ☒No 
(iii) A Design or Design/Access statement:  ☐Yes ☒No 
(iv) Sustainability Checklists 
TN06 Sustainability Checklist
TN07 Sustainable Buildings Checklist 
☒Yes ☐No 
☒Yes ☐No
Page 97

Page 98

It is the assessment of the Case Officer that the agent has
understood and given adequate consideration to the
sustainability aspects of the proposed development in the
submitted checklists, sufficient to accord with the core
sustainability requirements of both national and local planning
policy, specifically the relevant details of the ‘Sustainable
Places’ group of policies within NPF4 and LDP2 policies 04,
08 and 09. 
(v) A report on the impact of the proposed development e.g.
Retail impact, transport impact, noise impact, flood risk,
drainage impact, etc:   
Supporting Information is published in full on the planning
application file and is available to view via the Public Access
section of the Council’s website.
☐Yes ☒No 
(H) PLANNING OBLIGATIONS 
Is a Section 75 obligation required:   ☐Yes ☒No 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30, 31
or 32:  ☐Yes ☒No 
(J) Section 25 of the Act; Development Plan and any other material
considerations over and above those listed above which have been
taken into account in the assessment of the application 
(i)  List of all Development Plan Policy considerations taken into
account in assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places 
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity 
NPF4 Policy 4 – Natural Places 
NPF4 Policy 5 – Soils 
NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings  
NPF4 Policy 12 – Zero Waste
NPF4 Policy 13 – Sustainable Transport 
Liveable Places 
NPF4 Policy 14 – Design, Quality and Place 
NPF4 Policy 15 – Local Living and 20 Minute Neighbourhoods 
NPF4 Policy 16 – Quality Homes 
Page 98

Page 99

NPF4 Policy 18 – Infrastructure First 
NPF4 Policy 22 – Flood Risk and Water Management 
Productive Places 
NPF4 Policy 28 – Retail
NPF4 Policy 30 – Tourism 
Argyll and Bute Local Development Plan 2 (Adopted 2024) 
Spatial and Settlement Strategy 
Policy 02 – Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places 
Policy 05 – Design and Placemaking
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design – All Development
Policy 14 – Bad Neighbour Development 
Diverse and Sustainable Economy 
Policy 23 – Tourist Development, Accommodation, Infrastructure and 
Facilities 
Connected Places 
Policy 32 – Active Travel 
Policy 33 – Public Transport Infrastructure 
Policy 34 – Electric Vehicle Charging Points 
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes 
Policy 36 – New Private Accesses 
Policy 38 – Construction Standards for Public Roads 
Policy 39 – Construction Standards for Private Accesses 
Policy 40 – Vehicle Parking Provision 
Sustainable Communities 
Policy 58 – Private Water Supplies and Water Conservation 
Policy 59 – Water Quality and the Environment 
Policy 60 – Private Sewage Treatment Plants and Wastewater Drainage Systems
Policy 61 – Sustainable Urban Drainage Systems (SUDS)
Policy 63 – Waste Related Development and Waste Management 
High Quality Environment 
Policy 71 – Development Impact on Local Landscape Areas (LLAs) 
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 79 – Protection of Soil and Peat Resources
Policy 82 – Contaminated Land 
Page 99

Page 100

(ii)  List of all other material planning considerations taken into
account in the assessment of the application, having due
regard to Annex A of Circular 3/2013.  
• Third Party Representations 
• Consultation Reponses 
• Planning History 
• ABC Design Guides 
(K) Is the proposal a Schedule 2 Development not requiring an
Environmental Impact Assessment:  ☐Yes ☒No 
(L) Has the application been the subject of statutory pre-application
consultation (PAC):  ☐Yes ☒No 
(M) Does the Council have an interest in the site:  ☐Yes ☒No 
(N) Requirement for a pre-determination hearing: ☐Yes ☒No 
Objections to the application have been received from a total of five sources and, in
terms of the ‘Scheme of Administration and Delegations’ contained in the Council’s
Constitution (2025), this number is less than the eleven that is required in order for
the PPSL Committee to consider a proposal. 
The reason that this particular application is before Members results from the
recommendation of the Roads Department that Planning Permission be refused on
the grounds of a lack of parking spaces and the Planning Department’s opinion that
there are mitigating circumstances such that an approval can be justified as a minor
departure to Development Plan policy. 
In considering the benefits of holding a pre-determination hearing in this particular
case, it is the opinion of the Department that the representations that have been
received, the views that have been expressed by consultees and the Officer
assessment of the relevant planning issues contained within this report provide a
sufficient level of information to enable Members to make an informed decision based
on all of the material planning considerations pertaining to the development. 
It is, therefore, not considered that the proposal raises any complex or technical
issues that have not been addressed in the Report of Handling and it is not considered
that a discretionary local hearing would add value to the planning process.  
(O)(i) Key Constraints/Designations Affected by the Development: 
Local Landscape Area 
Potential Contaminated Land 
(O)(ii) Soils 
Agricultural Land Classification: Built Up Area
Page 100

Page 101

Peatland/Carbon Rich Soils Classification: ☐Class 1
☐Class 2
☐Class 3
☒N/A 
Peat Depth Classification: N/A  
Does the development relate to croft land?  ☐Yes ☒No
Would the development restrict access to
croft or better-quality agricultural land? 
☐Yes ☐No ☒N/A
Would the development result in
fragmentation of croft / better quality
agricultural land?
☐Yes ☐No ☒N/A 
(O)(iii) Woodland  
Will the proposal result in loss of
trees/woodland? 
☐Yes
☒No
Does the proposal include any
replacement or compensatory planting?
☐Yes
☐No details to be secured by condition
☒N/A  
(O)(iv) Land Status / LDP Settlement Strategy 
Status of Land within the Application  ☒Brownfield
☐Brownfield Reclaimed by Nature
☐Greenfield 
ABC LDP2 Settlement Strategy 
ABC LDP2 Allocations/PDAs/AFAs etc.: 
☒Settlement Area
☐Countryside Area
☐Remote Countryside Area
☒Helensburgh & Lomond Greenbelt 
N/A
(P) Summary assessment and summary of determining issues and
material considerations 
Site and Surroundings 
The application site, which is considered to be brownfield land, has an area of
approximately 700m2 and the plot historically was a tearoom (Susy’s Tearoom) which
was single storey with a pitched roof (similar to the neighbouring houses). It sits on the
Shore Road near to, but not within, the village centre and is close to the pier where the
Waverly passengers disembark and embark. None of the adjacent buildings are listed
and it is not a Conservation Area. The Susy’s Tearoom building was removed in
2020/2021 and the land on which it stood has been vacant since then. 
Page 101

Page 102

The immediately surrounding area contains a small single storey bungalow to the west
(Roseville), a one-and-a-half storey dwelling to the north-east (The Firs) and another
modern one-and-a-half storey dwelling further to the east (Lochee House). All of these
houses have a white render external wall finish and concrete tiled roofs of varying
profile. Directly adjacent to the site in a northerly and easterly direction is a large public
car park. 
Proposed Development 
The application is for the erection of a building that would accommodate a new
café/restaurant on the ground floor and the introduction of 4 self-catering flatted
apartments with balconies on the upper floors. 
The proposed building would be approximately 8 metres in height and would have a
flat roof. The top mezzanine level would be stepped back/recessed. The predominant
external wall finish would be white render but the top floor would feature Eternit panel
grey cladding. 
Settlement and Spatial Strategy 
In terms of the adopted Argyll and Bute Local Development Plan 2, the site is located
within the ‘Key Rural Settlement’ of Tighnabruaich and the assessment criteria
contained in Policy 01 include ensuring that the development is of an appropriate scale
and fit and that it respects the character and appearance of the surrounding townscape. 
A previous application was refused due to overdevelopment and the scale not being
appropriate. The current proposal involves a reduction in the scale of built development
through the removal of the staff accommodation block and a significant number of
design amendments have been made. It is considered that the site has the capacity to
accommodate this revised scale and design with regard to all material planning
considerations and, as such, the proposal represents an appropriate form of
development that is consistent with the key aims of the Settlement Strategy within
LDP2 Policy 01. 
NPF4 Policy 9 part (a) supports development on brownfield land such as the
application site. 
Tourism /Commercial Policies 
The proposed café/restaurant is at the edge of the village centre and it has an
established use as Class 3. There are no issues with providing a replacement
café/restaurant at this location of a very similar scale and size as the previous one. 
The adopted Local Development Plan Policy 23 relates to tourist facilities and
accommodation and NPF4 Policy 30 seeks to support tourism development on suitable
sites and they are both relevant in relation to the proposal for 4 self-catering units
(which is not a previous use). 
Overall, the proposal meets the criteria in LDP Policies 01 and 23 and NPF4 Policies
9 and 30 and is acceptable in principle. 
Design and Layout 
The revised design and layout are now considered acceptable given the removal of the
staff block and the changes to the fenestration including windows and the location of
Page 102

Page 103

the flue. The Art Deco style has been avoided to now offer a modern fresh look that fits
better with the Scottish vernacular. 
Flood and Water Management 
There are no issues relating to flooding as the finished floor levels of the building are
above the flood risk zone and no objections have been submitted by SEPA or the
Council’s Flood Advisor. 
Biodiversity 
There are no protected site or species on this site and it is brownfield land with no trees
and some limited scrub vegetation. NPF4 Policy 3 seeks to enhance biodiversity on
application sites and, whilst there is limited space for landscaping, other biodiversity
enhancement measures could be included as set out in both NatureScot and new
Scottish Government guidance and a condition is recommended to ensure biodiversity
enhancement measures are included. 
Contaminated Land 
It had previously been thought that the applicant had appropriately disposed of
asbestos from the demolition of the former tearoom building but it has since transpired
that this is not necessarily the case. The Council’s Contaminated Land Officer has
recommended that a condition can satisfy any concerns in relation to contaminants
potentially remaining from the asbestos and to ensure that there is no harm to human
health. It is a strict pre-start condition and it would ensure the proposal is compliant
with the relevant Development Plan policies. 
Residential Amenity of Neighbours 
Matters relating to the potential noise, smells, construction noise, opening hours,
overlooking, privacy of neighbours are all considered in detail in the assessment
section in Appendix 1 below and it is concluded that the proposal would not have an
adverse impact on residential amenity subject to the attaching of suitably worded
conditions. 
Access and Parking 
The Roads Department are recommending refusal as they do not consider the parking
spaces in the large neighbouring car park to represent a suitable provision and are of
the view that the number of proposed on-site spaces is insufficient to meet the increase
in parking demand resulting from the proposed development. 
It is the opinion of the Planning Department that the use of the public car park by
patrons and members of staff of the proposed café/restaurant can be accepted as this
was the situation that existed for decades in association with the previous Susy’s
Tearoom. 
Having regard to the parking standards in LDP2 Policy 40, the number of spaces to be
provided in relation to the four two-bedroomed units would be eight. As five on-site
spaces are proposed, this represents a shortfall of three spaces. 
In the particular circumstance of this case, it is considered that this shortfall can be
accepted as a minor departure to policy and the details of the mitigating factors are set
out in Section (S) below. 
Page 103

Page 104

Infrastructure 
The proposal identifies connection to the public water main and Scottish Water has
confirmed that the site is not within an area covered by the public sewerage system.
As such, a bio disc foul drainage treatment plant is proposed and, whilst some
concerns have been expressed by objectors over the detail of this, such matters would
be controlled via a separate licence from SEPA. The main factor to consider in relation
to planning is whether the system can be accommodated on the site and this has been
satisfactorily demonstrated. 
The site plan identifies the provision of a bin store and this is something that can be
conditioned to ensure final details are submitted for approval and that the
arrangements are constructed prior to the premises coming into use. 
Conclusion 
The revised scheme is considered to satisfactorily address the reasons for refusal on
the previous application in relation to the overdevelopment of the site, the design
detailing and the lack of in-curtilage car parking. The Roads Department have
recommended refusal given the non-compliance with LDP2 Policy 40 but it is
considered that the shortage of three parking spaces can be considered as a minor
departure to policy given the other benefits of the proposal. 
There is significant support given in the policies of NPF4 and LDP2 to a development
such as this, which is on a brownfield, infill site within a settlement and which involves
the replacement of a long-established food and drink enterprise whose built fabric and
design had become somewhat dated. 
The proposal is, therefore, recommended for approval subject to conditions. 
(Q) Is the proposal consistent with the Development Plan: ☐Yes ☒No 
(R) Reasons why Planning Permission or Planning Permission in
Principle Should be Granted: 
Please see Section (S) below. 
(S) Reasoned justification for a departure to the provisions of the
Development Plan: 
Policy 40 of LDP2 states that off-street vehicle parking shall be provided for
development in accordance with the car parking standards set out in Table 5 on Pages
67 and 68 of the Written Statement. 
The current proposal incorporates five dedicated car parking spaces within the red
line application site. The Roads Department considers that the provision of five on-
site spaces is insufficient to serve the four self-catering apartments, the patrons of the
café/restaurant, disabled persons and members of staff. A number of objections have
also been received relating to the matter of parking and concern has been expressed
that the car park does not have the capacity to support the additional parking demand.
Page 104

Page 105

There are reservations that, if the overnight parking restriction was to be lifted to
accommodate overnight parking for the self-catering units and members of staff then
this would also encourage motorhome parking. There is concern that the spaces
required would take up a significant proportion of the car park. 
In determining the extent of the shortfall in parking spaces associated with the current
proposal, it is considered reasonable to accept the use of the public car park by
patrons and members of staff of the proposed café/restaurant as this was the situation
that existed for decades in association with the previous Susy’s Tearoom. Having
regard to the parking standards in LDP2 Policy 40, the number of spaces to be
provided in relation to the four two-bedroomed units would be eight. As five on-site
spaces are proposed, this represents a shortfall of three spaces. 
In the particular circumstance of this case, it is considered that this shortfall can be
accepted as a minor departure to policy given the following wider considerations: 
• The presence of a large public car park immediately adjacent to the site and
there is no evidence to suggest that there is insufficient capacity when the
previous tearoom operated 
• The café/restaurant previously had no parking spaces on the site and the
public car park was used by patrons and staff. There is no change in the
floorspace of the café/restaurant so no change in trip profile and the use is
lawful and established   
• Whilst acknowledging that the introduction of the 4 new self-catering
apartments would intensify the overall site usage, the shortfall of three on-
site parking spaces is considered to be relatively small and, given the active
and sustainable travel options set out below, it is not considered that this
level of shortfall would result in such clear and demonstrable harm as to
warrant a refusal of the application 
• The aspirations that are inherent in NPF4 Policy 13 and Policy 33 of LDP2
highlight the importance of walking, cycling and proximity to public transport
links. Public transport links including bus stops and the local pier (where
passengers embark and disembark the PS Waverley) are within walking
distance of the site and the agent has confirmed that a secure bike rack will
be provided for customers and staff 
• The site previously was a café so it is brownfield land being brought back
into use. The facilities on offer need to be expanded as the café/restaurant
would not be commercially viable on its own so it is considered that the
scheme as currently presented would bring economic benefit to the area (as
opposed to a housing development, for instance) and would remove the
blight of this brownfield site 
Whilst it is recognised that the proposal does not fully meet the provisions of Policy 40
of LDP2 in terms of off-street parking, the mitigating factors detailed above are of
sufficient materiality for the application to be approved as a minor departure to the
Development Plan. 
Page 105

Page 106

(T) Need for notification to Scottish Ministers or Historic Environment Scotland: 
☐Yes ☒No   
Author of Report: Steven Gove Date:  05/01/2026 
Reviewing Officer: Kirsty Sweeney Date:  06/01/2026 
Fergus Murray
Head of Development & Economic Growth 
Page 106

Page 107

CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 25/00181/PP 
Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions  
1. Approved Details 
Unless otherwise directed by any of the conditions below, the development shall be
implemented in accordance with the details specified in the application form dated 4th
February 2025; the supporting information; and the approved drawings listed in the
table below unless the prior written approval of the planning authority is obtained for
an amendment to the approved details under Section 64 of the Town and Country
Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
General
Arrangement –
Site Location Plan 
Drawing No. HG
A3 L(9-)P901
- 05/02/2025
General
Arrangement –
Site Location Plan 
Drawing No. HG
A3 L(9-)P901A
- 07/02/2025
General
Arrangements –
Site Layout 
Drawing No. HG
GA L (--) P002C
C 12/06/2025
General
Arrangements –
Ground & 1st Floor
Plans 
Drawing No. GN
GA L (--) P003B
B 12/06/2025
General
Arrangements –
Ground Floor Plan 
Drawing No. HG
GA L (--) P004B
B 12/06/2025
General
Arrangements –
First and
Mezzanine Floor
Plans 
Drawing No. HG
GA L (--) P005B
B 12/06/2025
General
Arrangements –
Sections 
Drawing No. GN
GA L (--) P006B
B 12/06/2025
General
Arrangements –
Proposed
Elevations 
Drawing No. HG
GA L (--) P008B
B 12/06/2025
Page 107

Page 108

General
Arrangements –
Proposed
Elevations 
Drawing No. GN
GA L (--) P009C
C 12/06/2025 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.  
2. Contaminated Land Assessment 
Unless otherwise agreed in writing and in advance by the Planning Authority, prior to
any development commencing on the site, a scheme will be submitted by the
Developer (at their expense) to identify and assess potential contamination on the
site.  No work on the site shall commence until the scheme has been submitted to,
and approved, by the Planning Authority, and is thereafter implemented in accordance
with the scheme so approved.   
The scheme shall be undertaken by a competent person or persons in accordance
with relevant authoritative guidance including Planning Advice Note (PAN) 33 (2000)
and BS10175:2011 or, in the event of these being superseded or supplemented, the
most up-to-date version(s) of any subsequent revision(s) of, and/or supplement(s) to,
these documents. This scheme should contain details of proposals to investigate and
remediate potential contamination to the satisfaction of the Planning Authority, and
must include: 
a) A desk study and development of a conceptual site model/preliminary risk
assessment, including a ground investigation strategy for any phases of ground
investigation proposed to be undertaken (exploratory, main or supplementary).
The desk study and the scope and method of recommended investigations
shall be agreed with the Council prior to addressing parts b, c, and d of this
condition. 
Should the desk study show the need for further assessment, this will be undertaken
in the following sequence: 
b) A detailed investigation of the nature and extent of contamination on site, and
assessment of the risks such contamination presents 
c) Development and agreement of a remedial strategy (if required) to treat/
remove contamination ensuring the site is made suitable for its proposed use
(this shall include a method statement, programme of works and proposed
verification plan) 
d) Submission of a verification report for any agreed remedial actions detailing
and evidencing the completion of these works. 
Written confirmation from the Planning Authority that the scheme has been
implemented and completed shall be required by the Developer before any
development hereby approved commences. Where remedial measures are required
as part of the development construction detail, commencement must be agreed in
writing with the Planning Authority. 
Page 108

Page 109

Reason: In order to ensure that the potential risks to human health, the water
environment, property, and ecological systems arising from any identified land
contamination have been adequately addressed. 
3. Short Term Holiday Accommodation 
The residential accommodation units hereby approved shall be used for short-term
holiday occupancy only and not as a main residence and shall not be occupied by any
family, group or individual for a cumulative period of more than three calendar months
in any one year. A register showing dates of arrivals and departures shall be
maintained by the Site Operator and shall be available at all reasonable times for
inspection by the Planning Authority. 
Reason: In order to define the permitted occupancy to satisfy the provisions of the
Development Plan. 
4. Noise Assessment and Management Plan for Construction Operations 
Prior to the commencement of the development, a Noise Management Plan relative to
the construction phase shall be submitted to and approved in writing by the Planning
Authority. 
The document shall incorporate the following: 
i. An identification and assessment of all potential sources of nuisance that may
cause disturbance to nearby residents during the construction of the
development, including noise/ vibration, dust, surface runoff and any temporary
lighting. This should cover all aspects of the proposal (e.g. ground works,
access improvements and construction of building and any associated
facilities) 
ii. For all potential sources of nuisance, the applicant will be required to provide
a management plan that incorporates details of the suitable control measures
to be put in place so as to ensure that construction works do not cause a loss
of amenity to local residents and/or statutory nuisance. Such details shall
include (but not be limited to) the intended hours of working; the movement of
vehicles into, within and out of the site; the use of plant; and the storage of
equipment and materials on the site 
Unless otherwise agreed in writing with the Planning Authority, the construction of the
development shall be carried out in accordance with the approved Noise Management
Plan.     
Reason: In order to avoid sources of nuisance in the interest of amenity. 
5. Hours of Construction Working 
The hours of working at the site during the construction of the development hereby
approved shall be restricted to 08.00 to 18:30 Monday to Friday and 08.00 to 13.00 on
Saturdays. No construction work shall take place at the site on Sundays or Bank
Holidays. 
Reason: In order to avoid sources of nuisance in the interest of amenity. 
Page 109

Page 110

6. Noise Assessment and Management Plan for Operational Activities 
Prior to the development coming into use, a Noise Management Plan relative to
the operational phase shall be submitted to and approved in writing by the Planning
Authority. 
The document shall incorporate the following: 
i. A noise assessment undertaken in terms of BS4142:2014+A1:2019 ‘Methods
for rating and assessing industrial and commercial sound’, the scope of which
shall include the extraction unit for the commercial premises    
ii. Details of the means by which extraneous noise will be mitigated to ‘Best
Practicable Means’. The Noise Rating Criteria to be achieved during the day
(0700-1900hrs) will be NR35 and will be NR25 during the evening/night (1900-
0700hrs)  
iii. Details of the opening hours of the café/restaurant and the timing of deliveries
and collections to and from the site  
Unless otherwise agreed in writing with the Planning Authority, the development shall
be operated in accordance with the approved Noise Management Plan. 
Reason: In order to ensure that acceptable noise and vibration levels are not exceeded 
7. Odour Assessment and Mitigation Measures 
Prior to the commencement of the development, a detailed specification regarding the
collection, treatment and disposal of cooking odours shall be submitted to and
approved in writing by the Planning Authority.   
The specification shall incorporate the following: 
i. Precise details of the location of equipment used for the cooking and heating
of food 
ii. Information (including manufacturer’s details) on canopies, grease filters, rates
of air movement over the canopy, make–up air, air disposal points, etc. The air
disposal points should terminate at least 1 metre above any opening windows 
Unless otherwise agreed in writing with the Planning Authority, the system for the
collection, treatment and disposal of cooking odours shall be implemented in full
accordance with the approved details prior to the premises being brought into use for
the preparation and sale of food and it shall, thereafter, be operated and maintained
in a manner that is consistent with the agreed specification.     
Reason: In order to protect the amenity of the immediate area and prevent the creation
of odour nuisance. 
8. Arrangements for the Storage and Collection of Waste 
Prior to the commencement of the development, details of the proposed arrangements
for the storage and collection of waste shall be submitted to and approved in writing
by the Planning Authority. The arrangements shall be implemented in accordance with
the approved requirements prior to the development being brought into use and shall
Page 110

Page 111

thereafter be retained in perpetuity unless otherwise agreed in writing by the Planning
Authority. 
Reason: In order to accord with the principles of sustainable waste management within
NPF4 Policy 12 and LDP2 Policy 63. 
9. External Lighting 
Unless otherwise agreed in writing with the Planning Authority, all external lighting on
the application site shall be operated, positioned and angled in compliance with the
Scottish Government Guidance Note “Controlling Light Pollution and Reducing
Lighting Energy Consumption” (March 2007). 
Reason: In order to protect the amenity of the immediate area from the creation of
nuisance due to light pollution and to support the reduction of energy consumption. 
10. Details of Access and Parking 
Prior to the commencement of the development, the following details shall be
submitted to and approved in writing by the Planning Authority: 
i. The location, design and materials of any proposed walls, fences and gates 
ii. The means by which direct access between any of the proposed parking
spaces and the adjoining public car park is to be prevented 
iii. The materials to be used in the surfacing of the car parking spaces and turning
court 
iv. The layout of the access point into the turning court from the public car park 
Prior to the development being brought into use, the parking spaces and the access
into the turning court shall be formed in full accordance with the details approved under
points (ii), (iii) and (iv) above. Thereafter, the parking spaces and turning court shall
be maintained clear of obstruction for the parking and manoeuvring of vehicles. 
Reason: In the interests of road safety and in order to ensure that there is a level of
parking provision that is commensurate with the scale of the development. 
11. Biodiversity Enhancement 
Prior to the commencement of the development hereby approved, a biodiversity
statement shall be submitted to and approved in writing by the Planning Authority. The
statement shall demonstrate how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits will be
implemented and maintained for the lifetime of the development. 
All physical biodiversity enhancement measures (e.g. bird nesting boxes, ‘swift bricks’,
wildlife ponds, bat and insect boxes, hedgehog homes, etc) shall be implemented in
full before the development hereby approved is first brought into use. 
All biodiversity enhancement measures consisting of new or enhanced planting shall
be undertaken either in accordance with the approved scheme of implementation or
within the next available planting season following the development first being brought
into use.
Page 111

Page 112

The biodiversity statement should refer to Developing with Nature guidance |
NatureScot and Scottish Government Planning Guidance: Biodiversity as appropriate. 
Reason: In order to comply with the requirements of NPF4 Policy 3. 
12. Surface Water Drainage 
Prior to the commencement of the development hereby approved, details of a
sustainable urban drainage system compliant with the guidance set out in CIRIA’s
SuDS Manual C753 shall be submitted to and approved in writing by the Planning
Authority. The approved surface water drainage system shall be operational prior to
the development being brought into use and shall be maintained as such thereafter. 
Reason: In order to ensure that adequate surface water drainage is implemented to
prevent flooding elsewhere. 
13. Electricity Substation 
Prior to the commencement of the development, a report shall be submitted to and
approved in writing by the Planning Authority in consultation with the Environmental
Health Service and Scottish and Southern Electricity. This report shall incorporate the
following: 
i. An assessment of the noise levels generated by the operation of the existing
electricity sub-station, together with an assessment of whether the noise is
likely to give rise to complaints. This assessment should be carried out using
the methodology detailed in BS4142:2014+A1:2019 ‘Methods for rating and
assessing industrial and commercial sound’. In accordance with Planning
Advice Note 1/2011, as part of the assessment, consideration must be given
to any likely increase in noise levels that may reasonably be expected in the
foreseeable future from the operation of the electricity sub-station 
ii. Using the findings of the above assessment, the developer must then identify
the measures needed to mitigate any potential adverse effects of noise for the
patrons of the café/restaurant and the occupiers of the short-term holiday
letting units. Examples of suitable mitigation measures are detailed in Planning
Advice Note 1/2011. 
Unless otherwise agreed in writing with the Planning Authority, the building shall be
constructed having regard to the mitigation measures included within the approved
report. 
Reason: In the interests of the privacy and amenity of the proposed building having
regard to the provisions of Policy 14 of the Argyll and Bute Local Development Plan 2
(2024). 
14. Bicycle Storage 
A facility for the storage of cycles, the details of which shall have been previously
submitted to and agreed in writing with the Planning Authority, shall be provided within
the application site prior to the development hereby approved being brought into use.
Unless otherwise agreed in writing with the Planning Authority, the approved cycle
storage shall be retained in perpetuity for this dedicated purpose. 
Page 112

Page 113

Reason: In the interests of facilitating the use of cycles by the patrons of the building
hereby approved in accordance with the provisions of National Planning Framework 4
Policy 13 ‘Sustainable Transport’. 
Page 113

Page 114

ADVISORY NOTES 
1. The attention of the applicant/developer is drawn to the contents of the letter dated 20th
February 2025 from Scottish Water and the e-mail from SEPA dated 25th February
2025, both of which are in the list of documents relative to the application in the
Council’s Public Access System 
2. The attention of the applicant/developer is drawn to the information on the licensing
requirements for short-term lets that is contained in the Argyll and Bute Council website
and that can be accessed by using the following link: Short term lets licence | Argyll
and Bute Council 
3. The Environmental Health Service has provided the following advice: 
a. As a food premises, the proposal will be subject to the requirements of Food
Law. The applicant/developer is strongly recommended to contact the
Environmental Health Service to discuss the kitchen layout and proposed foods
to be made to ensure compliance with the law and good practice in order to
protect public health. In any case, the applicant is required to register as a food
business 
b. The applicant should be fully aware of the Construction (Design &
Management) Regulations 2015 (CDM 2015) and its implications on client
duties, etc 
c. It is very strongly recommended that appropriate measures should be taken in
the design of all buildings and their construction to inhibit the roosting and
nesting of gulls. Such measures are intended to reduce nuisance to, and
intimidation of, persons living, working and visiting the development 
d. It is the intention of the applicant/developer to install a drainage system at the
proposed development by means of connection to a new bio disc foul drainage
treatment plant with discharge to a body of water. The system of drainage
provided will require to be in accordance with the relevant Building (Scotland)
Acts, and this will be a matter for consideration by the Building Standards
Section in their processing of a Building Warrant application 
e. Discharge of effluent from the treatment plant into “controlled waters” (all inland
watercourses, coastal and ground waters) will require a discharge consent to
be put in place by the Scottish Environment Protection Agency (SEPA). If this
agency is satisfied with the proposed provision for drainage, the Environmental
Health Service would offer no objection to this arrangement 
f. Having regard to the formulation of the Noise Management Plan referred to in
Condition 6 above, it is recommended that deliveries and collections to and
from the site are not to be carried out between the hours of 23:00 and 07:00. 
Page 114

Page 115

COMMITTEE REPORT
APPENDIX A – RELATIVE TO APPLICATION NUMBER:  25/00181/PP 
PLANNING LAND USE AND POLICY ASSESSMENT 
1. Settlement Strategy 
1.1. In terms of the adopted Argyll and Bute Local Development Plan 2 (LDP2), the site is
located within the ‘Key Rural Settlement’ of Tighnabruaich and the assessment criteria
contained in LDP2 Policy 01 include ensuring that development is of an appropriate scale
and fit and that it respects the character and appearance of the surrounding townscape. 
1.2. A previous application (ref: 22/00223/PP) was refused, inter alia, for reasons of
overdevelopment and its scale not being appropriate. The current proposal has reduced
the scale of the development by removing the staff accommodation to allow for on-site
parking. It is considered that the site has the capacity to accommodate this revised scale
of development with regard to all material planning considerations and, as such, it is now
considered to represent an appropriate proposal that is consistent with the key aims of
the Settlement Strategy in LDP2 Policy 01. 
1.3. NPF4 Policy 9 (a) supports the principle of redevelopment on brownfield sites and the
application site is brownfield in nature. Part (c) relating to contaminated land is examined
below and the proposal is considered to meet this policy subject to a suitably worded
condition. 
1.4. NPF4 Policy 28 and LDP2 Policy 45 support retail in line with the ‘town centre first’
principle. In this instance, the proposed café is not located within the local centre but is at
the edge of the village centre and previously had an established use as a Class 3 facility
(Susy’s Tearoom). There are no issues with providing a replacement café/restaurant at
this location of a very similar scale and size as the previous one. 
1.5. LDP2 Policy 23 relates to tourist facilities and accommodation and NPF4 Policy 30 seeks
to support tourism development on suitable sites and both are relevant in relation to the
proposal for 4 self-catering units (which were not part of the previous facility). 
1.6. Policy 23 ‘Tourist Development, Accommodation, Infrastructure and Facilities’ supports
tourist accommodation where: 
• the development is in a form, scale and location which is consistent with its
surroundings – as explained above, there is support in principle for this scale of
development within a settlement location 
• The proposals respect and integrate well with the landscape/townscape character
and amenity of the surrounding area – this is considered in more detail in Section
2 below 
• There is reasonably accessible public transport – the issues in relation to parking
are considered in Section 8 below. In terms of sustainable travel, there are buses
to and from Tighnabruaich and also visitors to this facility may arrive by the Waverly
or as part of coach tours, which are considered more sustainable than the private
car. Visitors may also travel by bike but the proposal does not include any specific
details for the provision of bike parking or e-car charging. This, however, can be
the subject of a condition.
Page 115

Page 116

• It is well related to the existing built form of settlements – this is assessed in more
detail in Section 2 below 
1.7. NPF4 Policy 30 (b) contains similar criteria to Policy 23 and requires that the proposal
should meet the following: 
▪ Contribution to the local economy – it is considered that this proposal would make
a significant contribution to the local economy. It is a prime development site and
previously had a tearoom, which offered employment opportunities 
▪ Compatibility with surrounding area in terms of nature/scale of activity and impacts
of increased visitors – the proposed restaurant would replace the tearoom that
previously existed on the site. This is considered to be a ‘like-for-like’ replacement
that would not result in a rise in visitors. The introduction of four self-catering flats
would increase the number of people but the nature and scale of this activity would
be compatible with an existing village setting and is not considered to be significant 
▪ Impact on communities, for example, hinder the provision of homes and services
for local people – the development of this site for economic use, which continues
the existing established use, does not affect the provision of homes or services for
local people. Indeed, the opening of the restaurant would benefit the community
by adding a new service/meeting place to the area and providing jobs 
▪ Opportunities for sustainable travel and appropriate management of parking and
traffic generation and scope for sustaining public transport services particularly in
rural areas – this is assessed above under LDP2 Policy 23 
▪ Accessibility for disabled people – this issue will be addressed in detail at the
Building Warrant stage although there are no concerns based on the plans
currently under consideration 
▪ Measures taken to minimise carbon emissions – the Sustainable Buildings
Checklist submitted by the agent advises that, at this stage in the design process,
the energy requirements for the building have not yet been calculated. However,
it is “anticipated that renewables such as PV / solar / heat pump and zero carbon
technologies will be utilise to optimise reliance on renewables and minimise the
use of fossil fuels” 
▪ Opportunities to provide access to the natural environment – The site has
extensive views across the water and there is access to the shore across the main
road 
1.8. Overall, the proposal meets the criteria in LDP Policies 01 and 23 and NPF4 Policies 9
and 30 and is acceptable in principle. 
2. Location, Nature and Design of Proposed Development 
2.1. NPF4 Policy 14, LDP 9 and LDP Policies 05, 08, 09 and 10 serve to ensure that new
development, by reason of density and layout, effectively integrates with the urban setting
and they resist developments with poor quality or inappropriate layouts or densities,
including overdevelopment. 
2.2. NPF4 Policy 14 requires proposals to be underpinned by the six qualities of successful
places – healthy, pleasant, connected, distinctive, sustainable and adaptable. It also
Page 116

Page 117

states that proposals that are detrimental to the amenity of the surrounding areas will not
be supported. 
2.3. The LDP2 design policies establish general principles for new development including that: 
• New development must reflect or recreate the traditional building pattern or built
form 
• The scale, shape and proportion of development should respect or complement
existing buildings and the plot density and size. Colour, materials and detailing are
crucial to integrate the development within its context 
2.4. This is a well-positioned site that has the benefit of the adjoining car park and the
residential properties in this part of Tighnabruaich have limited architectural merit. As
such, it is recognised that the plot has the potential to accommodate a building that wishes
to make a statement arrived at through an innovative contemporary design approach and
which would be used by members of the public. Indeed, there are other buildings in the
village which are different from those in their surroundings and which stand out for this
reason. 
2.5. Whilst the Planning Authority does not wish to stifle distinctive development, it was
considered that the previous proposal would have had an adverse visual impact on the
immediate and wider surroundings by virtue of its excessive scale and massing and the
inappropriate design detailing. Additionally, it would have represented an
overdevelopment of the site on the basis that the separate restaurant/self-catering flats
and staff accommodation buildings would have taken up the maximum available space
(64% larger than the previous Susy’s Tearoom, caravan and metal shed) and would have
resulted in an intensification in the previous use (a tearoom and static caravan for staff)
through the presence of the restaurant, four holiday letting units and three staff studios. 
2.6. The footprint of the currently proposed restaurant building is virtually the same as that
taken up by the previous café, caravan and metal shed whilst the 3 staff units that were
initially proposed have now been removed to allow space for on-site car parking to the
rear, improving the parking on the site to what it was historically. 
2.7. In acknowledging that the current proposal would still constitute an intensification in
comparison with the long-standing previous use of the site, the removal of the staff
accommodation is considered to result in a development with an appropriate scale of use.   
2.8. In addition to the considerable reduction in the mass and footprint of buildings on the site,
there have been a number of significant design improvements, including: 
• The relocation of the stainless-steel flue from the west-facing side elevation to the
north-facing rear elevation and a reduction in its diameter 
• The avoidance of the Art Deco style 
• The simplification and slight enlargement in the areas of glazing on the front
elevation of ground floor 
• The introduction of glazed balustrading on the first floor and on the open side on
the east-facing side elevation 
Page 117

Page 118

• An increased verticality in the appearance of the top floor (although the overall
height of the building is not material to the overall scale) 
• The introduction of a recessive grey cladding external finish, which satisfactorily
mitigates the increase in volume and massing through the provision of an
appropriate contrast to the remainder of the building thereby breaking up the
massing 
• The omission of the porthole windows on the east-facing elevation 
Although the ridge of the revised building is 0.6 metres higher than the original scheme
(and, therefore, 1.4 metres higher than the top of the adjoining dwellinghouse, Roseville),
it is not considered that this increased differential would result in the residential property
becoming dominated to a significantly adverse degree in terms of scale.   
2.9 For all of the reasons set out above, it is considered that the proposal is now consistent
with Policy 14 of NPF4 and Policies 05, 08, 09 and 10 of LDP2. 
3. Landscape 
3.1. LDP2 Policy 71 relates to Local Landscape Areas (LLAs) and this part of Tighnabruaich
sits within such a designation. The policy seeks to resist development in or affecting LLAs
where its scale, location or design would have a significant adverse impact on the
character of the landscape. In all cases, the highest standards of location, siting, design,
landscaping, boundary treatment and materials and detailing will be required. 
3.2. As set out in Section 2 above, the proposed development is considered to be of an
appropriate scale, massing, layout and design and, on this basis, it would have a ‘neutral’
effect thereby preserving the character and appearance of this part of the LLA in
accordance with LDP2 Policy 71 and NPF4 Policy 4. 
4. Flood and Water Management 
4.1. NPF4 Policy 22(c) supports proposed developments that would not increase the risk of
surface water flooding to others, or itself be at risk; that would manage all rain and surface
water through sustainable urban drainage systems: and that seek to minimise the area of
impermeable surface. The above NPF4 Policy is underpinned in the Argyll and Bute Local
Development Plan 2 by Policy 55 ‘Flooding’ and Policy 61 ‘Sustainable Drainage
Systems’. 
4.2. In relation to potential flood risk, the responses from SEPA and the Council’s own advisor
identify that the site lies outwith the indicative limits of fluvial and surface water flooding,
as per the SEPA Future Flood Maps. The coastal flood extent overlaps marginally with
the southern region of the site. With reference to the Coastal Flood Boundary dataset, the
200 year still water level is 3.97 metres Above Ordnance Datum (mAOD). Including an
additional 0.86m allowance for climate change and a further 0.6m freeboard, Finished
Floor Levels for the building should be set to a minimum of 5.43 mAOD. With reference
to the site plan, it is evident that the proposed site sits at an elevation above 6.5 mAOD;
hence, this is acceptable. 
4.3. The applicant does not include any details of the surface water drainage and there is
concern that, given the size of the site, it may be difficult to secure a sustainable urban
drainage system in accordance with the policy within the bounds of the site. However, it
is on a coastal area where surface water can be discharged into the coastal waters without
Page 118

Page 119

causing any issues of localised flooding. A condition is recommended to secure an on-
site SUDS scheme to deal with the surface water. 
4.4. On the basis of the foregoing, and subject to a suitably worded condition, the proposed
development is considered to accord with the relevant Policies. 
5. Biodiversity 
5.1. NPF4 Policy 3 states that proposals should contribute to the enhancement of biodiversity
including restoring degraded habitats and strengthening nature networks and the
connections between them. Local developments (such as the preset proposal) must
include appropriate measures to conserve, restore and enhance biodiversity and these
should be proportionate to the nature and scale of the development. LDP2 Policy 73
‘Development Impact on Habitats, Species and Biodiversity’ underpins this policy. 
5.2. There are no protected site or species on the application site and it is brownfield land with
no trees and some limited scrub vegetation. Some objectors have commented on the
absence of a biodiversity/species assessment; however, this is not considered necessary
in this case given the state of the site. There is, however, a requirement under NPF4
Policy 3 to enhance the biodiversity on the site. It is recognised that there is limited space
for landscaping but other biodiversity enhancement measures could be included such as
bat/bird boxes on the building itself and climbing plants could be used up the side of the
building. A condition is recommended to ensure biodiversity enhancement measures are
included. 
5.3. On the basis of the foregoing, and subject to a suitably worded condition, the proposed
development is considered to accord with the relevant Policies. 
6. Contaminated Land 
6.1. NPF4 Policy 9 requires consideration of contamination on brownfield sites and Policy 82
‘Contaminated Land’ covers the same topic. 
6.2. During the consideration of the previous application, it had been thought that the applicant
had disposed of asbestos appropriately although it has since transpired that this was not
necessarily the case and an investigation has been undertaken by the Council’s
Contaminated Land Officer, who has been consulted on the current proposal. 
6.3. It is recommended that a condition can satisfy any concerns in relation to contaminants
potentially remaining from the asbestos thereby ensuring that there is no harm to human
health. It is a strict pre-start condition and it would ensure the proposal is compliant with
the relevant policies. 
7. Residential Amenity 
7.1. There is concern from some of the contributors regarding the impact of the scale of this
development in terms of noise, overlooking, loss of privacy and daylighting. In terms of
the first issue, LDP2 Policy 14 ‘Bad Neighbour’ states that bad neighbour development
includes any form of use involving a high turnover of customers at unsociable hours or
that could result in unpleasant odours. 
7.2. This criterion applies to the proposed café/restaurant but it should be noted that the use
of the site for the consumption of food and drink on the premises had previously
been established so this part of the proposal is accepted in principle. However, given the
length of time that the previous tearoom had been operated, it is highly unlikely that there
Page 119

Page 120

were any conditions on a Planning Permission that controlled matters such as noise,
odour, etc. The Environmental Health Officer has recommended that conditions should
be attached to a new permission in relation to controlling construction and operational
noise and addressing any potential cooking odours. It is considered reasonable to attach
these types of condition as this would result in assessments being carried out in the
context of the most up-to-date legislation and guidance and would allow appropriate
safeguarding measures to be introduced, such as opening hours, delivery/collection
times, etc. 
7.3. The owners of Roseville directly on the boundary are concerned about overlooking/loss
of privacy as a result of the presence of balconies associated with the upper floor
apartments. It is considered that the applicant has addressed this matter with the
westernmost front balcony having a solid wall on the elevation facing towards the mutual
boundary. 
7.4. The grounds of the dwellinghouses to the northeast and east (The Firs and Lochee
House) are distances of 25 metres and 39 metres respectively from the closest part of the
proposed building and these properties are considered to be of a sufficient distance away
that their privacy and amenity would not be affected to a significantly adverse degree as
a result of overlooking. 
7.5. There has been no daylight and sunlight analysis submitted with the application. However,
in looking at the direction of the sun and the possible shadow that would be cast from the
proposed building, it is likely to overshadow the neighbouring car park and it is not
considered that the shadow would cast as far as the property known as The Firs apart
from possibly in late evening when the setting sun is low in the sky. It is not considered
there would be any loss of daylight to the property to the south of the proposed
development given the path of the sun. 
7.6. The ‘Site Layout Planning for Daylight and Sunlight’ document published by the Building
Research Establishment (BRE) advises that the loss of light to windows in existing
buildings need not be analysed if the distance of each part of the new development from
the existing window is three or more times its height above the centre of the existing
window. In this case, the height of the new building is 8 metres and it would be located
some 29 metres and at an angle from the west-facing elevation of the dwellinghouse
known as The Firs, which contains a single small window. The distance between the two
buildings is more than three times than the height differential referred to in the BRE
guidance and, therefore, no analysis is needed. This is the same conclusion for the west-
facing windows on the dwellinghouse that is further from the site (Lochee House) whilst
the immediately adjacent Roseville does not have a window on its east-facing elevation. 
7.7. There is concern over noise/disturbance from the scale of activity that this development
would create. As mentioned above, there is already an established use as a café on this
site so a degree of noise/disturbance has previously been accepted in this area. It is not
considered that the introduction of an additional 4 self-catering letting units would result
in the creation of noise and disturbance that would diminish the existing levels of
residential amenity to a significantly adverse degree. Noise arising from the construction
and operation of the development (including opening hours) can be controlled via
conditions. 
7.8. The proposal may result in odours from the extraction system. The flue is located on the
rear elevation of the building that would face towards car parking spaces and the area
containing recycling bins. The Environmental Health Service has recommended the
attaching of a condition that requires the submission and approval of a detailed
Page 120

Page 121

specification regarding the collection, treatment and disposal of cooking odours and the
implementation of the system prior to the operation of the café/restaurant. 
7.9. Overall, and subject to suitably worded conditions, it is considered that the proposal would
not affect the residential amenity of the area to a significantly adverse degree and, as
such. it meets the requirements of Policy 14. 
8. Road Network, Parking and Associated Transport Matters 
8.1. NPF4 Policy 13 supports development that provide easy access by sustainable transport
modes and also provide charging points for vehicles and cycles and safe, secure cycle
parking. The relevant Argyll and Bute Local Development Plan 2 policies are Policy 35
‘Design of New and Existing, Public Roads and Private Access Regimes’ and Policy 40
‘Vehicle Parking Provision’. 
8.2. As explained above, the site is directly adjacent to a public car park and there is suitable
access and egress (with the appropriate visibility) into this car park. There are no concerns
with regard to access to the site and turning areas within the public car park off the public
road. 
8.3. The previous application did not include any on-site parking and this contributed to one
of the reasons for refusal. It previously was considered that the introduction of the four
self-catering apartments and the three staff accommodation units would represent an
increase in the demand for parking that would not be met by the proposed development. 
8.4. As a result of the omission of the staff accommodation units, the current proposal
incorporates five dedicated car parking spaces within the red line application site. The
Roads Department considers that the provision of five on-site spaces is insufficient to
cater for the four self-catering apartments, the patrons of the café/restaurant, disabled
persons and members of staff. A number of objections have also been received relating
to the matter of parking (see Section F above) and concern has been expressed that the
car park does not have the capacity to support the additional parking demand. There are
reservations that, if the overnight parking restriction was to be lifted to accommodate
overnight parking for the self-catering units and members of staff then this would also
encourage motorhome parking. There is concern that the spaces required would take up
a significant proportion of the car park. 
8.5. In determining the extent of the shortfall in parking spaces associated with the current
proposal, it is considered reasonable to accept the use of the public car park by patrons
and members of staff of the proposed café/restaurant as this was the situation that existed
for decades in association with the previous Susy’s Tearoom. Having regard to the
parking standards in LDP2 Policy 40, the number of spaces to be provided in relation to
the four two-bedroomed units would be eight spaces. As five on-site spaces are proposed,
this represents a shortfall of three spaces. 
8.6. In the particular circumstance of this case, it is considered that this shortfall can be
accepted as a minor departure to policy given the following wider considerations: 
• The presence of a large public car park immediately adjacent to the site and there
is no evidence to suggest that there is insufficient capacity when the previous
tearoom operated 
• The café/restaurant previously had no parking spaces on the site and the public car
park was used by patrons and staff. There is no change in the floorspace of the
café/restaurant so no change in trip profile and the use is lawful and established   
Page 121

Page 122

• Whilst acknowledging that the introduction of the 4 new self-catering apartments
would intensify the overall site usage, the shortfall of three on-site parking spaces is
considered to be relatively small and, given the active and sustainable travel options
set out below, it is not considered that this level of shortfall would result in such clear
and demonstrable harm as to warrant a refusal of the application 
• The aspirations that are inherent in NPF4 Policy 13 and Policy 33 of LDP2 highlight
the importance of walking, cycling and proximity to public transport links. Public
transport links including bus stops and the local pier (where passengers embark and
disembark the PS Waverley) are within walking distance of the site and the agent
has confirmed that a secure bike rack will be provided for customers and staff 
• The site previously was a café so it is brownfield land being brought back into use.
The facilities on offer need to be expanded as the café/restaurant would not be
commercially viable on its own so it is considered that the scheme as currently
presented would bring economic benefit to the area (as opposed to a housing
development, for instance) and would remove the blight of this brownfield site 
8.7. Whilst it is recognised that the proposal does not fully meet the provisions of Policy 40 of
LDP2 in terms of off-street parking, the mitigating factors detailed above are of sufficient
materiality for the application to be approved as a minor departure to the Development
Plan. 
9. Infrastructure 
9.1. NPF4 Policy 18 seeks to encourage, promote and facilitate an infrastructure first approach
to land use planning, which puts infrastructure considerations at the heart of placemaking.
NPF4 Policy 22(c) supports proposed developments if they can be connected to the public
water mains. The above NPF4 Policies are underpinned in the Argyll and Bute Local
Development Plan 2 by Policy 60 ‘Private Sewage Treatment Plants and Wastewater
Drainage Systems’. 
9.2. In addition, NPF4 Policy 12(c) expects that developments, including residential and
commercial, should incorporate measures that allow the appropriate segregation and
storage of waste together with convenient access for the collection of waste. This NPF4
Policy is underpinned in the Argyll and Bute Local Development Plan 2 by Policy 63
‘Waste Related Development and Waste Management’. 
9.3. It is proposed to connect the development into the public water main but there is no public
sewerage system at this location. Scottish Water has confirmed that there is currently
sufficient capacity in the public water supply. 
9.4. The application includes provision of a bio disc foul drainage treatment plant. There are
some questions over the detail of this from objectors; however, such matters would be
controlled via a separate licence from SEPA. The main factor to consider in relation to
planning is whether it can be accommodated on site and this has been satisfactorily
demonstrated. 
9.5. The site plan identifies the provision of a bin store and this is something that can be
conditioned to ensure final details are submitted for approval and that the arrangements
are constructed prior to the premises coming into use. 
Page 122

Page 123

9.6. On the basis of the foregoing, and subject to suitably worded conditions, the proposed
development is considered to accord with the relevant Policies. 
Page 123

Page 124

This page is intentionally left blank

Page 125

FBs
Manse
The Grove
Sewage Ppg Sta
MLWS
Anchorage House
House
4.3m
Shingle & Boulders
ESS
The Firs
Lochee
MHWS
Woodside
Tignabruaich
FBs
B 8000
Tighnah Eaglais
Groyne
House
Car Park
Knowe
Drains
Shingle & BouldersInglewood
© Crown Copyright and database right 2025
All rights reserved. OS license (customer) account number AC0000849384
Location Plan Relative to; 25/00181/PP
O
0 30 6015 Meters
Application Site
Page 125

Page 126

This page is intentionally left blank

Page 127

Argyll & Bute Council
Development & Economic Growth   
This report is a recommended response to the Scottish Government’s Energy
Consents Unit (ECU) consultation on the Section 36 Consultation for Cnoc Buidhe
Wind Energy Hub, comprising a wind farm of up to 29 wind turbines, with 14 of these
up to 180m to blade tip and 15 up to 200m to blade tip, with an ancillary battery energy
storage system and associated infrastructure approx. 2.5km East of Belochantuy and
10km Northwest of Campbeltown. 
Reference No: 25/00600/S36/ ECU00004767
Applicant: Cnoc Buidhe Wind Energy Hub Limited 
Proposal: S36 Consultation: Cnoc Buidhe Wind Energy Hub, comprising a wind
farm of up to 29 wind turbines, with 14 of these up to 180m to blade
tip and 15 up to 200m to blade tip, with an ancillary battery energy
storage system and associated infrastructure.
Site Address: Approx. 2.5km East of Belochantuy and 10km Northwest of
Campbeltown 
(A)  THE APPLICATION 
The Section 36 Application comprises the following key elements: 
• Up to 29 wind turbines, with a maximum tip height varying between 180m - 200m
(14 at 180m to blade tip and 15 at 200m to blade tip) (potentially with an external
transformer)
• Aviation safety lighting (8 turbines with visible lights)
• Foundations supporting each wind turbine.
• Crane hardstandings at each turbine location
• Watercourse crossings and associated infrastructure
• Approx. 17.7km new access tracks and 9.8km upgraded existing tracks.
• Onsite underground electrical cables and trenches
• A control building and substation
• A Battery Energy Storage System (BESS) with an indicative capacity of up to
108.6MW.
• Habitat management and restoration proposals, including up to 177.5ha of
peatland restoration plus an additional 6.4ha of mixed broadleaf planting. 
• Compensatory planting
• Two temporary construction compounds, laydown areas and car parking
• Felling of 568.8ha to accommodate infrastructure, wider forestry management
and peatland restoration proposals
• One temporary borrow pit; and
• Approx. 0.5 km of new temporary excavated track to facilitate access to the
onsite borrow pit from the forestry track to the west of T28. 
The generation capacity of the wind turbines will be approx 191.4MW and the
capacity of the BESS will be 108.6MW. Permission is sought to operate the proposal
for a period of 40 years. 
Connection to Electricity Grid - The power produced by the wind farm (and stored
in the BESS) will be transmitted to the substation via underground cables. A
connection to the national grid will be required. The Applicant holds a grid connection
offer of 2029. The grid connection does not form part of this application. A separate
Page 127 Agenda Item 6

Page 128

Section 37 application will be made to the Scottish Ministers by Scottish and
Southern Energy Networks (SSEN). 
(B) RECOMMENDATION: 
That the ECU be notified accordingly that: 
(1) Ornithology - Argyll & Bute Council has been unable to reach a conclusion
on ornithology due to the outstanding information requested by NatureScot
in respect to a kernel analysis for golden eagle and alternative raft locations for
Osprey. 
Furthermore, the Council does not agree that a suspensive condition is the best
mechanism to secure the removal of five wind turbines in the interests of
mitigating barrier effects on Greenland white-fronted geese. It is considered that
this amendment to the proposal would constitute a material change which could
have implications for the wider proposal that are unclear at this time and require
to be explored e.g. environmental impacts, infrastructure re-design, and
requirement for re-consultation. To apply such a condition could result in an
unreasonable and unimplementable consent. 
Argyll & Bute Council OBJECT unless this important mitigation to protect
Greenland white-fronted geese is undertaken in advance of determining this
application. It is, therefore, recommended that the proposal should be amended
accordingly and be subject to a further period of formal consultation prior to any
determination by the ECU or Scottish Ministers. 
(2) Peat Landslide Hazard Risk Assessment - Argyll & Bute Council has been
unable to reach a conclusion in respect to the Peat Landslide Hazard Risk
Assessment (NPF4 Policies 5 and 11 and LDP2 30 and 79) as no response has
been provided by Ironside Farrar on the further information provided by the
Applicant. Argyll & Bute Council OBJECT unless this issue is resolved to the
satisfaction of Ironside Farrar prior to determination of this application by the
ECU. Should this issue not be resolved the Council would defer to Ironside Farrar
(or any other body appointed by the ECU to provide expert guidance on this
matter) in the event of a PLI. 
(3) Scottish Forestry – Argyll & Bute Council has been unable to reach a
conclusion within the time afforded in respect to Forestry as no updated
response has been provided by Scottish Forestry to clarify they are satisfied with
the Applicant’s response. Argyll & Bute Council are therefore not in a position to
confirm whether the proposal is consistent with the relevant provisions of NPF4
Policies 6 and 11 and LDP2 Policies 77 and 78 and would recommend that the
ECU consider these matters prior to determination. 
(4) Archaeological Impact - Argyll & Bute Council has no objection in respect to
Archaeological Impact, subject to a condition and informative to secure the
recommendations of the West of Scotland Archaeology Service being attached
to any grant of consent for a Written Scheme of Investigation (WSI) for
archaeological mitigation measures and an advisory note that the Applicant
ensures they have all necessary legal permissions for any elements of their
archaeological mitigation. Specifically, in regard to the RAF Hudson aircraft
crash site mitigation proposals which may require a license from the MoD if it is
to be disturbed.
Page 128

Page 129

(5) Public Access - Argyll & Bute Council has no objection in respect to Public
Access subject to advisory notes being attached to any consent to ensure that
any Access Controls i.e. gates, and cattle grids comply with the British Horse
Society Guidance. Furthermore, that public access during construction should
comply with NatureScot guidance ‘Good practice during wind farm
construction.’ 
(6) Landscape & Visual Impact - Argyll & Bute Council has no objection in respect
to landscape and visual impact subject to a condition to secure further aviation
lighting mitigation in the form of an Aircraft Detection Lighting System being attached
to any consent. 
(7) Biodiversity Impact - Argyll & Bute Council has no objection in respect to
Biodiversity Impact, subject to conditions to secure the recommendations of the
Local Biodiversity Officer being attached to any consent. 
(8) Noise Impact - Argyll & Bute Council has no objection in respect to noise impact,
subject to suitably worded conditions to limit the noise levels, tonality, and amplitude
modulation to control noise levels from the proposal and provide appropriate noise
mitigation as recommended and agreed by the Council’s Noise Consultant being
attached to any consent. 
(9) Flood Risk - Argyll & Bute has no objection in respect to flood risk subject to
conditions to secure the recommendations of the Flood Risk Assessor being
attached to any consent:
• To ensure watercourse crossings are designed to convey the 1 in 200 year
plus climate change flood event. 
• Surface water drainage is designed in accordance with CIRIA C753 and
ensures that post development surface water runoff does not exceed the pre-
development surface water runoff. The surface water drainage should be in
operation prior to the start of construction.
(10) Argyll & Bute Council requests that all conditions recommended by
other consultees are included in any Consent with exception to the
condition requiring removal of 5 turbines referred to at (1) above.
(C) CONSULTATIONS 
ENERGY CONSENTS UNIT RESPONSES 
NatureScot (8th August 2025) – advised the ECU they object until further information
is obtained from the Applicant on barrier effects on the Kintyre Goose Roosts SPA.
Once this is provided, they will give the proposal further consideration. In respect to
disturbance effects they object unless conditions to control the timing of borrow pit
blasting activities are applied to any consent to ensure works are undertaken to
avoid significant disturbance of wintering Greenland white-fronted geese roosting in
Lussa Loch. 
Golden eagle – NatureScot do not consider that the effects of habitat/range
loss/territory impact for golden eagle have been adequately assessed. A kernel
analysis of the most recent full year (minimum) is required to help them understand
the extent of this territory. 
Page 129

Page 130

Osprey – to reduce the risk of collision mortality, NatureScot advise that alternative
osprey nesting platforms should be provided further away from the proposal to
reduce the risk of collision mortality i.e. to the east of Lussa Loch. 
OCEMP & subsidiary plans – the proposals contained in the Outline Construction
Environmental Management Plan appear to be broadly appropriate for: pollution
prevention, protection of protected species and sensitive bird interests and
biodiversity enhancement. 
Aviation Lighting – it would be worthwhile exploring further mitigation using ADLS. 
Advice is also provided on the North Arran NSA, Kintyre Goose Lochs SSSI,
Bellachantuy and Tangy Gorges SSSI/GCR. NatureScot defer to Argyll & Bute
Council with regards to potential significant adverse effects on local landscape
designations. 
Additional Information – Ornithology (October 2025) – submitted by the Applicant. 
Additional Information - NatureScot (21st November 2025) – provided further
advice to the ECU in relation to potential barrier effects on the Kintyre Goose Roosts
SPA. They advised they object unless the proposal is amended/made subject to
conditions so that works are done strictly in accordance with their required
changes/mitigation. 
Golden eagle – they note the Applicant has not submitted previously requested
kernel analysis of the most recent full year of satellite tag data for golden eagle. Their
advice remains that until this information is submitted, they cannot make a full
assessment of the likely effect of the proposal. 
Habitats Regulations – they advise that as the proposal could affect the Kintyre
Goose Roosts SPA protected for its Greenland white-fronted goose the site’s status
means the requirements of the Conservation (Natural Habitats &c) Regulations
apply, and the ECU is required to consider the effect of the proposal on the SPA by
carrying out an appropriate assessment. Kintyre Goose Roosts Ramsar site and
Kintyre Goose Lochs SSSI may also be affected but the interests of these
designations are fully addressed as part of the consideration of the SPA. To help the
ECU do this NatureScot have advised that if the proposal is undertaken strictly in
accordance with the following changes/mitigation, the proposal will not adversely
affect the integrity of the site: 
Changes - the proposal shall be amended to remove the five most southwest
turbines, 15, 24, 26, 28 and 29. Reason: to maintain a clear functional ‘corridor’ to
accommodate the displacement effect on the established flight path between Tangy
Loch and Glenbarr. 
Mitigation - A programme of Post Construction Monitoring shall be created and
funded by the Applicant for satellite tagging of Greenland white-fronted geese in the
area, subject to agreement with NatureScot, for at least two years post
commissioning. Reason: to help understand cumulative barrier effects arising from
the proposal on Greenland white-fronted geese. 
Clarification notes from Applicant (28th November 2025) – the Applicant provided
a clarification note in response to NatureScot’s objection. 
Page 130

Page 131

NatureScot response to Applicant’s Clarification note (18th December 2025) –
advised the ECU this advice is provided further to that contained in their previous
responses, in relation to the mitigation of potential barrier effects to the Kintyre
Goose Roosts SPA. NatureScot provide their views on the applicant’s clarifications. 
Condition – in principle NatureScot are happy to work towards agreeing a condition.
However, they have concerns with the condition proposed by the Applicant. It is
agreed that the consented Tangy IV forms part of the baseline for consideration of
cumulative effects. However, there is disparity on the status of the Variation
Application for Tangy IV and its implications for any consent that may follow. It is
NatureScot’s understanding that the Variation Application will consider only limited
aspects of the proposal – turbine dimensions and minor layout changes within
micrositing tolerances. The number of turbines (16) has been established and will
not be revisited. There is therefore no mechanism to reduce the number of turbines
in Tangy IV (consented or varied). Consequently, the proposed condition is not
appropriate. 
If a suspensive condition is to be applied, 1(ii) should include wording that also
pertains to any Varied Development that may be consented at Tangy IV as a result
of a Variation Application, given that the principle of the proposal comprising 16
turbines is already established and cannot be varied, unless made subject of a
Variation Application by the Applicant. It remains NatureScot’s view that the only
means to secure the mitigation they deem necessary is the removal of five turbines
to mitigate the barrier effects on Greenland white fronted geese. The responsibility
for determining the most appropriate mechanism to secure this mitigation lies with
the ECU and Argyll & Bute Council. 
The Applicant asks whether their proposed condition is sufficient for NatureScot to
“remove their objection.”  This is a misunderstanding of NatureScots position. The
purpose of a conditioned objection is to secure changes/mitigation that are deemed
necessary to protect nationally and/or internationally important natural heritage
interests. The response has the status of an objection if conditions to secure
mitigation are not attached to any consent granted by Scottish Ministers. The
objection cannot be removed by providing the wording of the condition. It is the act
of applying the condition to any consent that will have the effect of removing it. 
RSPB Scotland (8th August 2025) – advised the ECU they have no comment. 
Historic Environment Scotland (HES) (16th May 2025) – advised the ECU the
proposal does not raise historic environment issues of national significance, and they
do not object. Scheduled monument consent may be required for some of the
proposed forestry works. They recommend a condition to ensure that Killocraw cup
marked stone and Dun a’Bhuic dun SW of Cleongart are fenced off to mitigate the
risk of accidental damage during construction. 
Scottish Forestry (4th June 2025) – advised the ECU that further information should
be provided in the Forestry Plan to demonstrate full compliance with the UK Forestry
Standard. The Applicant should provide an assessment, as per the “Deciding future
management options for afforested deep peatland,” to determine if the Priority
Habitat restocking exemption applies. The Applicant should clarify the total area of
woodland loss to ensure that the correct area of compensatory planting is applied.
Compensatory planting for the woodland lost, other than that converted to Priority
Habitat peatland, should be secured by a condition to any consent. It is not clear
whether forest lost to new roads has been included in the woodland loss figure and
this should be clarified. The appropriate consenting route required to accommodate
Page 131

Page 132

construction, including infrastructure and management felling, totalling 1,041.3ha
and restocking of management felling areas and compensatory planting relating to
permanent woodland loss would be the S36 consent. Any felling and restocking not
required for the development should follow the usual consenting routes under the
Forestry and Land Management (Scotland) Act 2018. 
Applicant Response to Scottish Foresty (11th July 2025) – provided the following
response to Scottish Forestry: 
• The Forest Plan would be produced by a professional forestry consultant who
will ensure it is delivered to UKFS standards.
• Alongside the Forest Plan, they will undertake an assessment using the Forestry
Commission Practical Guide: “Deciding future management options for
afforested deep peatland (2015)” and engage professional support from an
ECoW during the delivery of restoration works to ensure these meet the
assessment criteria.
• The total area of woodland loss will be determined prior to construction when the
detailed infrastructure footprint and replanting areas are confirmed.
• The Applicant is happy to secure the compensatory planting requirement via
condition, with the final wording to be agreed. 
Transport Scotland (TS) (15th May 2025) – advised the ECU they have no
objection subject to conditions being attached to any consent to secure submission
and approval of a Construction Traffic Management Plan (CTMP), the route for
abnormal loads, abnormal load accommodation measures required, and any
necessary additional signing or temporary traffic control measures. In addition,
advisory notes are provided relating to works within the trunk road boundary. 
SEPA (Scottish Environment Protection Agency) (21st May 2025) – advised the
ECU they object due to impacts on peat. They will reconsider their position if the
proposals are modified to address issues relating to the relocation of T1, T3, T5, T7,
T14 and T27 to shallower peat, modification of T3 track layout, relocation of the track
to T25. In addition, SEPA request conditions relating to enabling works, geotechnical
clerk of works, construction, and environment management plan, borrow pits –
scheme of works, forestry, peat and carbon rich soils, and decommissioning,
restoration and aftercare are attached to any consent. If these will not be applied,
then SEPA object. 
Applicant – Justification Note to SEPA (30th September 2025) - the Justification
Note provided to the ECU contains plans showing adjusted locations, with reduced
peat impacts, of the infrastructure identified in SEPA’s response. The adjusted
infrastructure locations are all contained within micrositing allowances assessed as
part of the S36 application and so no additional environmental impacts requiring
assessment result. 
SEPA (10th October 2025) – advised the ECU they withdraw their objection subject
to conditions outlined in their previous response and a further micrositing condition.
If these will not be applied, then SEPA object. 
Health and Safety Executive (21st October 2025) – advised the ECU they have no
comment. 
Vodaphone (17th October 2025) – advised the ECU they have no comment. 
Page 132

Page 133

Argyll District Salmon Fishery Board (ADSFB) – the ECU advised ADSFB were
consulted but did not respond. 
Scottish Water Scottish Water (17th April 2025) – advised the ECU they have no
objection. Advice is provided on surface water and drinking water protected areas. 
Ironside Farrar, Peat Landslide Hazard Risk Assessment (PLHRA), Stage 1
Checking Report (PLHRA) (25th July 2025) – advised the ECU The PLHRA required
minor revisions. 
Applicant response (1st December 2025) – provided a response to Ironside Farrar’s
Stage 1 Checking Report comments. At time of writing no further response has been
received from Ironside Farrar. 
Defence Infrastructure Organisation (DIO) (15th May 2025) – advised the ECU
that, subject to the conditions to secure Aviation Lighting and Aviation Charting and
Safety Management, they have no objection. 
NATS Safeguarding (22nd April 2025) – advised the ECU the proposal conflicts
with their safeguarding criteria. Accordingly, NATS (En Route) plc objects. 
Note from Energy Consents Unit (22nd July 2025) – the ECU advised it has been
agreed NATS Safeguarding objection is withdrawn on the basis that should Scottish
Ministers decide to grant consent an appropriately worded condition will be imposed
which will mitigate the unacceptable impacts on the operation of the primary radar
located at Lowther Hill and associated air traffic management operations. 
NATS Safeguarding (18th July 2025) – advised the ECU they are content with the
proposed condition and if the Scottish Government is minded to grant consent
subject to its imposition, then they can treat NATS objection as withdrawn. 
Glasgow Prestwick Airport (GPA) Glasgow Prestwick Airport (GPA) (14th April
2025) – advised the ECU they have no objection. 
Highlands & Islands Airport (19th May 2025) – advised the ECU the following
submission of an updated Instruments Flight Procedure Assessment they have no
objection subject to a condition to secure confirmation from the operator of
Campbeltown Airport that an Instrument Flight Procedure Assessment has
demonstrated that an IFP Scheme is not required or an IFP Scheme has been
approved by the Airport Operator and the Civil Aviation Authority has confirmed its
approval and it has been submitted to NATS in the interests of aviation safety to
secure mitigation and ensure the development does not alter traffic patterns or
impact the safety of Campbeltown Airport. 
Office for Nuclear Regulation (14th April 2025) – advised the ECU they have no
comment. 
British Horse Society (16th May 2025) – provided advice to the ECU on Outdoor
Access management for equestrian users, and guidance on managing woodland
and forestry access and drivers of large vehicles. 
West Kintyre Community Council (June 2025) – have advised the ECU they
object on the grounds of landscape & visual impact (including cumulative), impact of
aviation lighting on dark skies, ancient heritage sites, ornithology – loch Lussa, SSSI,
SPA, Kintyre Ramsar, endangered white front Greenland geese and other species,
Page 133

Page 134

potential damage to health from infra sound, economic, tourism and recreational
impact, potential environmental damage and pollution from lithium battery
fires/explosions, community benefit – electricity discount letters sent to households
during the formal consultation may discourage objections, and Allt Domhain is not
included in any documentation. 
East Kintyre Community Council (14th April 2025) – have advised the ECU they
object on the grounds of Socio-Economics & Tourism Amenity including lack of full
economic assessment based on Kintyre tourists including attractions such as the
Kintyre Way, Route 66, West Coast Water and the area’s dark skies, adverse visual
impact from these important tourism attractions, including Loch Lussa, the Kintyre
Way and Peninver, the Kintyre peninsula’s fragile socio-economic designation in the
LDP2, and, the destruction of views from two top tourist spots – Peninver and the
Kintyre Way. 
Campbeltown Community Council (16th December 2025) have advised the ECU
they have no significant objection. However, they do have a caveat with regard to
the proposed energy storage scheme with the potential fire risk of lithium-ion
batteries. Given that Cnoc Buidhe is situated in an area of peat, a fire would be
difficult to control. This would be well outside the capability of our local rural fire
service. 
BT (15th April 2025) – advised the ECU they have no objection. BT requires 100m
minimum clearance from any structure to the radio link path. 
Joint Radio Company (23rd April 2025) – advised the ECU the proposal is cleared
subject to 50m micrositing with respect to radio link infrastructure operated by the
local energy networks. 
North Ayrshire Council (3rd September 2025) – advised the ECU that consideration
should be given to the potential impacts on the North Arran NSA. 
Argyll & Bute Council Consultee Responses 
Consultant Landscape Architect (21st August 2025) – recommends no objection in
respect of landscape and visual interests. The significant landscape effects are limited
to within 5 km, and visual effects to within 16 km, of the site. The proposals have gone
through an appropriate iterative design process, which has included mitigation where it
is appropriate to do so, followed design advice provided by Argyll & Bute Council,
NatureScot, and Historic Environment Scotland (HES), and focused on reducing impacts
at sensitive receptors. This process is clearly set out in the EIAR. Key design revisions
include: the reduction in turbine numbers from 33 to 29; a revision of the proposed tip
heights from 230 m to an even mixture of 180 m and 200 m; relocation of turbines into
the interior of the site, away from the highly sensitive coast and residential receptors;
and the adoption of all recommended and currently available aviation lighting mitigation
measures. 
West of Scotland Archaeology Service (WOSAS) (13th January 2026) – have
advised they have no objection to the proposal subject to a condition to secure a
Written Scheme of Investigation (WSI) for archaeological mitigation measures and
also ask that the Applicant be advised to ensure that they have all necessary legal
permissions for any elements of their archaeological mitigation that lie out with the
planning system.  Specifically, in regard to the RAF Hudson aircraft crash site
mitigation proposals which may require a license from the MoD if it is to be disturbed. 
Page 134

Page 135

Local Biodiversity Officer (4th July 2025) - requested further information and
amendment: the Plantlife survey including proposed mitigation and enhancement
along Drumore Burn, relocation of the hardstand area near T29 to avoid sensitive
habitat, fish and Fresh Water Pearl Mussel surveys, a Species Protection Plan to
include mitigation for bats, small pearl-bordered fritillary butterfly, reptiles and
amphibians. Fish and freshwater pearl mussel should also be included, dependant
on the results of the surveys, and a more detailed Biodiversity Enhancement Plan
including details of riparian planting in the Drumore Burn Regeneration Management
Area, monitoring and management of tree species, and deer. Consideration should
also be given to opportunities to enhance habitat for small pearl bordered fritillary
butterfly and inclusion of hibernacula for reptiles and amphibians. 
Applicant Response to Local Biodiversity Officer (11th July 2025) - provided
further information on Drumore Burn, T29 hardstanding and GWDTEs, and fish and
freshwater pearl mussels.  
Local Biodiversity Officer (LBO) (18th August 2025) – provides advice and
recommendations on: NatureScots objection and requirement for conditions, Atlantic
temperate rainforest along Drumore Burn, Construction Environment Management
Plan, SEPA – deep peat, bat mortality monitoring and mitigation, Species Protection
Plan, Pine Marten, Small Pearl-Bordered Fritillary Butterfly, Amphibians and
Reptiles, Biodiversity Enhancement Plan, fish and freshwater pearl mussel,
ornithology, cumulative impact, Bird Protection Plan, Biodiversity Enhancement
Strategy, and peatland restoration, 
Noise Consultant (June 2025) - conclude that, in general, good practice has been
adopted by the Applicant, with a few issues identified. The most significant of these
issues are that confirmation there are no derelict residential properties within the
study area is not given. Minor observations include errors in the reporting of the grid
references of baseline noise monitoring locations. 
The Applicant has also applied a lower fixed limit (non-financially involved) of 43 dB
LA90 for the night-time period. The Noise Consultant recommends that a lower fixed
limit of 38 dB LA90 is adopted, and the updated values are provided. 
Following a satisfactory response to these issues, it is considered there would be no
reason to object on noise grounds, subject to a suitable condition to limit the noise
levels, tonality, and amplitude modulation to control noise levels from the proposal. 
Applicant’s response to Noise Consultant (11th & 16th July 2025) – the Applicant
corrected the discrepancies in the grid references of baseline monitoring locations.
They confirmed that when identifying properties to assess within the study a review
was undertaken of satellite imagery and OS Address Base data. All relevant
residential properties identified from this process were considered as part of the
noise assessment. Consequently, the Applicant is not aware of any derelict
residential properties in vicinity of the proposal. 
With regard to the proposed noise condition, the Applicant states that it looks
appropriate in principle and they are happy to follow best practice guidance when
drafting conditions. However, the Applicant notes the UK Government has released
a consultation on Assessment and rating of wind turbine noise guidance which
discusses both a consistent night and day-time fixed limit, and inclusion of Amplitude
Modulation. Given this ongoing, and pertinent, consultation they suggest discussing
condition wording at a later date with updated guidance in place.
Page 135

Page 136

ABC Noise Consultant (6th August 2025) - confirmed the Applicant’s response is
reasonable, however, note there is no guarantee on the timeline of introduction of
the new Government guidance. 
ABC Roads and Infrastructure Services (RIS) (14th April 2025) – no objection
subject to conditions to ensure the site is accessed from the A83 Tarbet –
Campbeltown Trunk Road. Strictly no direct access from any Argyll & Bute Council
Road and a Traffic Management Plan to be submitted for approval by RIS, prior to
any work starting on site. The Traffic Management plan should include details of all
materials, plant, equipment, components, and labour required during the
construction works. Furthermore, RIS note the use of borrow pits but appreciate
additional materials may be sourced from local quarries. RIS are concerned about
the possible impact on the local road network. Depending on the Traffic
Management Plan, RIS may require road condition surveys to be conducted. 
Additional Information – ABC Roads and Amenity Services (RIS) (20th
November 2025) – no objection subject to conditions to ensure the site is accessed
from the A83 Tarbet to Campbeltown Trunk Road. Strictly no direct access from any
Argyll & Bute Council Road and a Traffic Management Plan to be submitted for
approval by RIS, prior to work starting on site. The Traffic Management plan (TMP)
should include details of all materials, plant, equipment, components, and labour
required during the construction works. Note - Depending on the TMP, RIS may
require road condition surveys to be undertaken. 
The site connects directly to the A83 Tarbet to Campbeltown Trunk Road
approximately one mile north of Bellochantuy, Transport Scotland should be notified. 
RIS note this junction “will provide access to the Proposed Development for all
abnormal loads associated with the turbine deliveries, as well as access for Heavy
Goods Vehicles (HGVs) delivering construction materials and general site traffic”
with traffic travelling north and south on the A83(T) through to the junction. 
Significant volumes of material are required to support construction, which includes
construction of approx. 18km of new access track and 10km of upgraded track.
Whilst it is noted the Applicant recognises “To seek opportunities to obtain site-won
stone for construction purposes and thereby minimising construction traffic volumes
through exploring borrow pit options” RIS further notes that the borrow pit
assessment concludes “The borrow pit has the potential to provide approximately
45% of the estimated aggregate requirement for the Proposed Development (minus
concrete aggregate) assuming 50% suitability of excavated material”. RIS is
therefore concerned about the possible impact on the local road network. 
Flood Risk Assessor (6th May 2024) – no objection subject to conditions to ensure
any proposed watercourse crossings are designed to convey the 1 in 200 year plus
climate change flood event and that surface water drainage is designed in
accordance with CIRIA C753 and ensure that post development surface water runoff
does not exceed the pre-development surface water runoff. The surface water
drainage should be in operation prior to the start of construction.  
Access Officer (12th January 2026) – has no objection in respect to Public Access
subject to advisory notes being attached to any consent to ensure that any Access
Controls i.e. gates, and cattle grids comply with the British Horse Society Guidance.
Furthermore, that public access during construction should comply with NatureScot
guidance ‘Good practice during wind farm construction.’
Page 136

Page 137

Please note: the above are summaries and the full consultee responses can
be viewed on the Energy Consent Unit and Argyll & Bute Council websites. 
(D) HISTORY:   
23/00598/SCOPE - Scoping opinion for proposed S36 application for Cnoc Buidhe
wind farm, Cnoc Buidhe wind farm, West Lussa Forest, Campbeltown – Opinion
issued 19th June 2023 
(E)       PUBLICITY:   
As the Council is not the Determining Authority the ECU oversees the Publicity of
the application. 
Public Consultation – Whilst not a statutory requirement for S36 applications, the
Applicant has undertaken Public Consultation. Public exhibitions were held in
November 2022 and 2023. A summary of the representations received during the
public exhibitions is provided in the Pre-Application Consultation Report (March
2025) which accompanies this S36 application available on the ECU website
(reference ECU00004767). 
(F) REPRESENTATIONS:   
As the Council is not the determining Authority the ECU considers any
representations. At time of writing, they are in receipt of 51 representations made up
of 12 objections and 39 letters in support. The key issues are summarised below: 
In Support 
• Will help Scotland meet renewable energy targets.
• Renewable energy is critical to address climate change.
• Proposal is well located within an existing wind farm cluster.
• The proposal will help boost the local economy – supply chain commitments,
local ownership, electricity discount scheme, rent and business rates.
• Wind turbines are an excellent solution to energy issues.
• They are not an "eyesore.” 
• Cnoc Buidhe would power over 230,00 homes helping tackle Climate Change
and ensuring increasing energy demands are met by the lowest cost generation
that reduces bills and means we do not need to rely on imported fuels and power
and their highly volatile prices.
• Cnoc Buidhe includes approx. 180 ha of Peatland Restoration, alongside Native
Broadleaf Planting and regeneration of Atlantic Temperate Rainforest. This will
increase the biodiversity in the area and protect the environment for future
generations.
• Cnoc Buidhe has committed to £5000/MW of Community Benefit Fund likely to
represent approx. £1,000000 each year for 40 years. This will be used to fund
an Electricity Discount Scheme for local residents and businesses, offering
annual discounts of between £700 - £150 on electricity bills.
• Cnoc Buidhe has signed a Memorandum of Understanding with EKREG offering
1% of Community Ownership for free, an additional 4% at cost and more at
market rate if there’s appetite. 
Page 137

Page 138

• Cnoc Buidhe will help boost the local economy through prioritisation of local
suppliers and contractors. Contracts will be awarded to local businesses that
meet the minimum requirements and are within 10% of the best quote tendered.
• Cnoc Buidhe is expected to generate significant benefits for the Argyll & Bute
economy including £28m Gross Value Added and four hundred job years
generated during construction and development, plus £1.4m GVA and c. £3.4m
in non-domestic rates per year during operation (40 years). 
Against 
• Public Inquiry – objectors would like to be kept informed and included.
• Historic Environment, Archaeology, and Listed Buildings
• Biodiversity, Ecology & Ornithology – rainforest, bird flight paths, roosting Kintyre
geese, migrating Greenland white-fronted geese owls, hen harriers, eagles, and
black grouse. 
• Scale of development – over intensification
• Adverse landscape and visual impact  
• Impact of aviation lighting on dark skies 
• Misleading photomontages of VP’s - Drumore Na Bodach, Bellochantuy Beach
• Noise and Acoustic Environment, health, amplitude modulation, infrasound  
• Transportation – impact on roads, businesses, and homes  
• Impact on the local economy and tourism - Kililegruer Campsite and Lussa Loch
- anglers, birdwatchers, and walkers
• Walking routes, Route 66 and the Kintyre Way 
• Duration of consent 
• Scotland does not need to produce any more energy. 
• Health & wellbeing  
• Battery Storage System Safety – fire/explosion potential impact has not been
considered.
• Batteries & Environmental Impact – not a green product in terms of production
and disposal
• Impact on peat 
• Flooding 
• Cumulative Impact - High level of applications in Kintyre (including pylons)
• Unacceptable Mitigation Measures 
Note: The comments raised above are addressed in the assessment of the
proposal at Appendix A of this report. 
Note: Please note that the representations above have been summarised, and
the full letters of representation are available on the ECU website. 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report (EIAR): Yes 
The EIAR (November 2024) comprises the following volumes: 
• Volume 1: Non-Technical Summary (NTS)
• Volume 2: Main Report
Page 138

Page 139

• Volume 3a: Figures
• Volume 3b: Landscape and Visual Impact Assessment Visualisations
(Part 1)
• Volume 3c: Landscape and Visual Impact Assessment Visualisations
(Part 2)
• Volume 3d: Cultural Heritage Visualisations
• Volume 4a: Technical Appendices (Part 1)
• Volume 4b: Technical Appendices (Part 2); and
• Volume 5: Confidential Documents 
Key topics covered in the EIAR include: 
• Chapter 1 Introduction 
• Chapter 2 Approach to the EIA
• Chapter 3 Site Selection and Design Strategy
• Chapter 4 Development Description
• Chapter 5 Landscape and Visual Impact Assessment
• Chapter 6 Cultural Heritage
• Chapter 7 Ecology
• Chapter 8 Ornithology
• Chapter 9 Hydrology, Hydrogeology & Geology (including peat)
• Chapter 10 Noise and Vibration
• Chapter 11 Access, Traffic and Transport
• Chapter 12 Socioeconomics, Tourism and Recreation
• Chapter 13 Other Issues
• Chapter 14 Summary of Significant Effects 
In addition, the following documents are also provided in support of the
application: 
• Planning and Renewable Energy Policy Statement
• Design and Access Statement 
• Pre-Application Consultation Report 
Additional Environmental Information October 2025 
• Ornithology Report 
(ii)  An Appropriate Assessment under the Conservation (Natural Habitats)
Regulations 1994:   NatureScot will advise the ECU  
(iii)  A Design or Design/Access statement:   Yes  
(iv)  Sustainability Checklists (with reference to the requirements of LDP2
Policy 04): Not required proposal accompanied by full EIAR.  
(v)  A report on the impact of the proposal e.g. Retail impact, transport
impact, noise impact, flood risk, drainage impact etc:  All relevant
reports are encompassed within the EIAR. 
(H) PLANNING OBLIGATIONS 
Page 139

Page 140

Is a Section 75 agreement required:  No 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  No  
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been considered in the
assessment of the application 
(i) List of all Development Plan Policy considerations considered in assessment
of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 5 – Soils
NPF4 Policy 6 – Forestry, Woodland, and Trees
NPF4 Policy 7 – Historic Assets and Places
NPF4 Policy 11 – Energy
NPF4 Policy 22 – Flood Risk and Water Management
NPF4 Policy 33 – Minerals 
Annex B – National Statements of Need 
3. Strategic Renewable Electricity Generation and Transmission Infrastructure 
Argyll & Bute Local Development Plan 2 (LDP2) (Adopted 2024) 
Policy 02 – Outwith Settlement Areas
Policy 04 – Sustainable Development
Policy 15 – Protection, Conservation and Enhancement of Our Historic Environment
Policy 16 – Listed Buildings 
Policy 19 – Scheduled Monuments
Policy 20 – Gardens and Designed Landscapes
Policy 21 – Sites of Archaeological Importance
Policy 30 – The Sustainable Growth of Renewables
Policy 31 – Minerals 
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
Policy 43 – Safeguarding of Aerodromes
Policy 55 – Flooding
Policy 56 – Land Erosion
Policy 57 – Risk Appraisals
Policy 58 – Private Water Supplies and Water Conservation
Policy 59 – Water Quality and the Environment
Policy 60 – Private Sewage Treatment Plants and Wastewater Drainage Systems
Policy 61 – Sustainable Drainage Systems (SuDS)
Policy 62 – Drainage Impact Assessments
Policy 63 – Waste Related Development and Waste Management
Policy 70 – Development Impact on National Scenic Areas (NSA’s)
Policy 71 – Development Impact on Local Landscape Areas (LLA’s)
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 74 – Development Impact on Sites of International Importance
Page 140

Page 141

Policy 75 - Development Impact on Sites of Special Scientific Interest (SSSIs)
Policy 76 - Development Impact on Local Nature Conservation Sites (LNCS)
Policy 77 – Forestry, Woodland, and Trees
Policy 78 – Woodland Removal
Policy 79 – Protection of Soil and Peat Resources
Policy 80 - Geodiversity 
(ii) List of all other relevant planning considerations considered in the
assessment of the application, having due regard to Annex A of Circular
3/2013 
• Scottish Energy Strategy (2017)
• Onshore Wind Policy Statement (2022)
• Draft Energy Strategy and Just Transition Plan (2023)
• Good Practice Principles for Shared Ownership of Renewable Energy
Developments, Scottish Government, 2019
• Onshore Wind Turbines: Planning Advice, Scottish Government (May 2014)
• The Argyll & Bute Landscape Wind Energy Capacity Study, 2017 (LWECS)
• ABC Technical Note – Biodiversity (Feb 2017)
• Landscape Institute and Institute of Environmental Management and
Assessment – Guidelines for Landscape and Visual Impact Assessment, Third
Edition (2013)
• Scottish Natural Heritage – Visual Representation of Wind Farms Guidance
(Version 2.2, 2017)
• Scottish Natural Heritage - Siting and Designing Wind Farms in the Landscape
Guidance (Version 3a, 2017)
• Historic Environment Policy for Scotland (2019)
• Scottish Government, Draft Planning Guidance: Biodiversity, 2023
• The Climate Change (Emissions Reduction Targets) (Scotland) Act 2024 
• Managing Change in the Historic Environment 
• PAN 1/2011: ‘Planning and Noise’ (March 2011)
• Scottish Government’s Policy on ‘Control of Woodland Removal’ (Forestry
Commission Scotland 2009) 
• UK Forestry Standard (UKFS)
• PAN 60 – Planning for Natural Heritage (Jan 2008)
• Views of statutory and other consultees
• Planning history of the site
• Legitimate public concern or support expressed on relevant planning matters 
(K) Is the proposal a Schedule 2 Development not requiring an EIAR: No, an EIAR
was required. 
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  No - PAC is not required for S36 applications. 
(M) Does the Council have an interest in the site: No 
(N) Requirement for a pre-determination hearing: No
(O) Is the proposal consistent with the Development Plan: No – due to unresolved
objections from NatureScot and National Air Traffic Services 
Page 141

Page 142

(P) Need for notification to Scottish Ministers or Historic Environment Scotland:
No 
Author of Report: Arlene Knox                       Date: 8th January 2026 
Reviewing Officer: Sandra Davies                 Date: 9th January 2026 
Fergus Murray
Head of Development & Economic Growth 
Page 142

Page 143

APPENDIX A – RELATIVE TO APPLICATION NUMBER: 25/00600/S36 
COMMITTEE REPORT   
PLANNING LAND USE AND POLICY ASSESSMENT   
1. THE SECTION 36 CONSENTING REGIME  
1.1 Any application for an onshore power generating station with an installed capacity
of over 50 MW requires the consent of Scottish Ministers under S36 of the
Electricity Act 1989. Any authorisation given includes a deemed planning
permission. Consequently, there is no need for a planning application to be made
to the Council. The Council’s role in this process is one of a consultee.  
1.2 The Development Plan is not the starting point for considering S36 applications.
The reason for this is that sections of the Planning Act which establish the primacy
of Development Plan Policy in decision making are not engaged. NPF4 and LDP2
form the Development Plan. Whilst they do not have primacy in S36 decision
making, they remain an important consideration to inform the Council’s
consultation response.  
1.3 Schedule 9 of the Electricity Act requires the Applicant and the decision maker to
have regard to the preservation of amenity. It requires that in the formulation of
proposals the developer shall have regard to: 
(a) the desirability of preserving natural beauty, of conserving flora, fauna and
geological or physiological features of special interest and of protecting sites,
buildings, and objects of architectural, historical, or archaeological interest; and 
(b) shall do what he reasonably can to mitigate any effect which the proposals
would have on the natural beauty of the countryside or on any such flora, fauna,
features, sites, buildings, or objects.  
1.4 It obliges the Scottish Ministers as decision maker to have regard to the
desirability of the matters at (a) and the extent to which the Applicant has complied
with the duty at (b).  
1.5 Assessment of the proposal against the policies of NPF4 and LDP2 will ensure
that proper consideration is given by the Council to the extent that the proposal
satisfies these Schedule 9 duties.  
1.6 The Council can either support or object and recommend conditions to be
imposed if Scottish Ministers grant consent. If the Council raises an objection,
Scottish Ministers are obliged to hold a Public Local Inquiry (PLI) if they are
minded to grant consent. They can also choose to hold a PLI in other
circumstances at their own discretion. Public Inquiries are conducted by
Reporters appointed by the Directorate for Planning and Environmental Appeals
(DPEA). If consent is granted the Council as Planning Authority is responsible for
the agreement of matters pursuant to conditions, ongoing monitoring, and
enforcement.  
Page 143

Page 144

1.7 This report considers the relevant policy considerations, planning merits, views of
consultees and representations. It recommends views to be conveyed to the ECU
for consideration before a decision is made.  
2. SPATIAL AND SETTLEMENT STRATEGY  
2.1 Policy 02 – Outwith Settlement Areas establishes acceptable scales of
development in three different zones. The site is located within Remote
Countryside, which only supports specific categories of development. This
includes renewable energy related development. In principle, Policy 02 supports
renewable energy and ancillary development in these areas, providing they are
consistent with all other relevant LDP2 Policies. With respect to the requirement
for developments to accord with all other relevant policies, particular attention is
drawn to Policies 70 to 76 with respect to landscape and the natural environment.
Proposals must also demonstrate that there will be no unacceptable adverse
effects (individual or cumulative) on natural heritage, built and/or cultural heritage,
and landscape and visual amenity. 
2.2 Policy 71 – Development Impact on Local Landscape Areas (LLA)  - requires that
proposals in or affecting a LLA must demonstrate that: a) any significant adverse
effects on the landscape quality for which the area has been designated are
clearly outweighed by social, economic or environmental benefits of community
wide importance; b) The proposal is supported by a landscape and visual impact
assessment and has taken account of the content of any relevant Argyll & Bute
Landscape Capacity Assessment; and c) The location, scale, design, materials
and landscaping would be of a high standard and would safeguard or enhance
the special qualities and character of the LLA.  Part of the access route is located
in the West Kintyre (Coast) LLA which has been considered by the Council’s
Consultant Landscape Architect.  
2.3 Policy 04 – Sustainable Development requires that in preparing new proposals
developers should demonstrate the following sustainable development principles
(where relevant) such as: maximise the opportunity for local community benefit;
support existing communities and maximise the use of existing infrastructure and
services; conserve and enhance the natural and built environment and avoid
significant adverse impacts on biodiversity, natural and heritage assets; respect
the landscape character of an area and the setting and character of settlements;
avoid places with significant risk of flooding, or ground instability and avoid having
significant adverse impacts on land, air and water environment.  This application
is supported by an EIAR which sets out in detail the measures proposed to ensure
the proposal is ‘Sustainable Development.’  
2.4 Policy 11 – Energy of NPF4 and Policy 30 – Sustainable Growth of Renewables
LDP2 provide the primary policy framework for assessing renewable energy
proposals. In this case, due to the outstanding information and consultee advice
and need for amendment referred to in the recommendation it is has not been
possible to reach a conclusion. 
2.5 Having due regard to the above due to outstanding information detailed in
the Recommendation relating to Golden eagles, Osprey, Scottish Forestry
and the Peat Landslide Hazard Risk Assessment and need for amendment
required by NatureScot it is not possible to reach a conclusion on whether
Page 144

Page 145

the proposal is consistent with the provisions of LDP 2 Policy 02 – Outwith
Settlement Areas and LDP Policy 04 – Sustainable Development. 
3. ENERGY & SUPPORTING THE SUSTAINABLE GROWTH OF RENEWABLES  
3.1 Argyll & Bute Council is keen to ensure that Argyll & Bute continues to make a
positive contribution to meeting the Scottish Government’s targets for renewable
energy generation. These targets are important given the compelling need to
reduce our carbon footprint and our reliance on fossil fuels, reinforced by the
Climate Change (Emissions Reduction Targets) (Scotland) Act 2019. The Council
will support renewable energy developments where these are consistent with the
principles of sustainable development, and it can be adequately demonstrated
that there would be no unacceptable significant adverse effects.  
3.2 This proposal has been assessed primarily against the two lead Statutory
Development Plan policies relating to renewable energy, Policy 11 – Energy of
NPF4 and Policy 30 – the Sustainable Growth of Renewables of LDP2. Other
policies are referred to where relevant.  
4. LOCATION, NATURE, AND DESIGN OF PROPOSAL  
4.1 The proposal is located on the western side of the Kintyre peninsula within Lussa
Forest, approx. 2.5km east of Bellochantuy and 8.2km north-west of
Campbeltown. The site comprises undulating plateau and low, rounded hill
summits which generally slope westwards towards the coast. Summits include
Cnoc Buidhe in the south and the south-western slopes of Cnoc Reamhar in the
north. Lussa Loch lies to the south-east and some small watercourses drain west
towards the coast.  
4.2 Landcover is almost entirely commercial forestry, in various stages of the planting,
growing and felling cycle, connected by a network of forestry tracks. These tracks
connect to the A83 which borders the site at its western access point. The Kintyre
Way passes within 300m of the south-eastern site boundary along the western
shore of Lussa Loch.  
4.3 The Kintyre 66 route follows the A83 on the western and B842/National Cycle
Network 78 on the eastern Kintyre coast forming a loop around the Kintyre
peninsula. The B843 passes 10km to the south between Campbeltown and
Machrihanish.  
4.4 There are no residential properties within the site, but a number of farmsteads
and isolated properties are located on the elevated, farmed slopes to the west
and settlements within 5km include Bellochantuy and Glenbarr which are set on
the low-lying coastal strip by the A83. Thirty-six residential properties were
identified within 2.5 km of the turbines and were examined as part of the
Residential Visual Amenity Assessment.  
4.5 Nearby existing and consented wind energy development comprises a large
cluster surrounding the central ridge of the Kintyre peninsula and another linear
group further north. The larger central cluster surrounds the Cnoc Buidhe site to
the north, east and south and comprises the operational Beinn An Tuirc wind farm
(Phase 1, 2, and 3) to the east, Auchadaduie and Blary Hill to the north and Tangy
I and II to the south. The consented Tangy IV, a repowering scheme to replace
Page 145

Page 146

the existing Tangy I and II Wind Farms, is 1km to the south. The linear cluster
further north follows the spine of the Kintyre hills with the consented Clachaig
Glen wind farm closest at 7km to the north together with the existing Deucheran
Hill, Cour and Freasdail developments and the consented High Constellation and
Eascairt.  
4.6 In addition to these developments, transmission infrastructure, including
substations and overhead lines are characteristic elements of the landscape.
Access to the proposed wind farm would be from the A83 to the west, via the
existing Beinn an Tuirc wind farm track north of Bellochantuy. Approx. 18.2 km of
new track would be built and 9.8 km of existing tracks would be upgraded.
Permanent ancillary infrastructure includes a substation compound with a control
building and a Battery Energy Storage System (BESS). Temporary infrastructure
components include borrow pits and construction compounds.  
4.7 The site is located entirely within Lussa Forest, a commercial forestry plantation
managed by Forestry and Land Scotland (FLS). As a result of construction,
568.8ha of woodland would require to be felled and 236ha would not be
restocked. 88ha of this has been identified for peatland restoration with a further
147.8ha of compensatory planting required. 
4.8 A Biodiversity Enhancement Strategy (BES) details the proposed habitat
enhancement measures, which include: 
• forest to bog restoration, without the use of translocated peat (approx. 106.4
ha in total) - 33.6 ha of direct compensation for the loss of 3.36 ha of priority
peatland habitat and 72.8 ha; when considering the use of translocated peat,
this includes a further 71.1ha of enhancement.
• 39.3 ha of mixed broadleaved tree planting, of which 6.4 ha results directly
from the proposal, and is therefore considered enhancement.
• 9.9 ha has been designated as the Drumore Burn Regeneration Management
Area (DBRMA) to improve habitat connectivity to the Atlantic temperate
rainforest out with the site to the west, as well as the centre of the site.
• Targeted management of blanket bog susceptible to tree encroachment.
• Grazing management and protection of sensitive upland habitats; and
• Pine Marten Denning Opportunities (installation of pine marten boxes).  
4.9 It is proposed that the site would continue to have the characteristics of a working
commercial forest, with access tracks and periodic harvesting of timber.  
4.10 Visible aviation lights would be installed on the nacelles of eight of the 29 turbines
(T2, T4, T9, T13, T15, T19, T27 and T28) and 22 turbines would be fitted with
infra-red (non-visible) hub-mounted obstruction lights, as agreed through
consultation with the Civil Aviation Authority (CAA). Based on historic weather
data, it is expected that the visible lights would only need to operate at 100%
brightness for about 7% of the time that they are lit.  
4.11 The S36 Application comprises the following key elements: 
• Up to 29 wind turbines, with a maximum tip height varying between 180m -
200m (14 at 180m to blade tip and 15 at 200m to blade tip) (potentially with
an external transformer)
• aviation safety lighting (8 turbines with visible lights)
Page 146

Page 147

• Foundations supporting each wind turbine.
• Crane hardstandings at each turbine location
• Watercourse crossings and associated infrastructure
• Approximately 17.7km of newly constructed access tracks and 9.8 km
upgraded existing tracks.
• Onsite underground electrical cables and cable trenches
• A control building and substation
• A Battery Energy Storage System (BESS) designed to complement with an
indicative output capacity of up to 108.6 MW.
• Habitat management and restoration proposals, including up to 177.5 ha of
peatland restoration plus an additional 6.4 ha of mixed broadleaf planting. 
• Compensatory planting
• Two temporary construction compounds, laydown areas and car parking
• Felling of 568.8ha to accommodate infrastructure, wider forestry management
and peatland restoration proposals
• One temporary borrow pit; and
• Approx. 0.5 km of new temporary excavated track to facilitate access to the
onsite borrow pit from the forestry track to the west of T28.  
4.12 The generation capacity of the wind turbines will be approx 191.4MW and the
capacity of the BESS will be 108.6MW. Permission is sought to operate the
proposal for a period of 40 years.   
Infrastructure  
4.13  Office for Nuclear Regulation - advised the ECU they have no comment.
4.14 Scottish Water – have advised the ECU they have no objection. Advice is
provided on Drinking Water Protected Areas, and Surface Water.  
4.15 Drinking Water Protected Areas – they have confirmed there are no Scottish
Water drinking water catchments or water abstraction sources, designated as
Drinking Water Protected Areas in the area that may be affected by the proposal.  
4.16 Surface Water – for reasons of sustainability and to protect customers from
potential future sewer flooding, they have advised they will not accept surface
water connections into their combined sewer system.  
4.17  Connection to Electricity Grid – The electrical power produced by the wind farm
and the BESS will be transmitted to the substation via underground cables. A
connection to the national grid’s electricity system will be required. The Applicant
holds a grid connection offer of 2029. The grid connection does not form part of
the proposal and is not the subject of the Application. A separate S37 application
will be made to the Scottish Ministers by Scottish and Southern Energy Networks
(SSEN)
4.18 Private Water supplies (PWS) – The EIAR considers the impact on PWS. No PWS
sources are hydrologically connected to the footprint of the infrastructure and
therefore no significant effects are predicted. 
5. NET ECONOMIC IMPACT, INCLUDING LOCAL AND COMMUNITY SOCIO-
ECONOMIC BENEFITS
Page 147

Page 148

5.1 Policy 11 – Energy of NPF4 states that proposals will only be supported where
they maximise net economic impact, including local and community socio-
economic benefits such as employment, associated business, and supply chain
opportunities. Policy 30 – the Sustainable Growth of Renewables of LDP 2
requires all applications for wind turbine developments to be assessed in terms
of net economic impact, including local and community socio-economic benefits
such as employment, associated business, and supply chain opportunities.  
5.2 Socio-Economic Impact - The proposal would deliver some economic benefits
during its construction and operation. The expected socio-economic benefits are
set out in the EIAR. The EIAR advises that during the construction phase, it is
estimated the proposal will generate 1,000 job years across Scotland, including
404 job years in Argyll & Bute. 
5.3 During the operational phase it is estimated it will generate 95 jobs across
Scotland, including 12 jobs in Argyll & Bute, per year.  
5.4 It is expected that the proposal will contribute commercial rates to the local
economy. It is estimated that these will be worth in the region of £3.4 million
annually.  
5.5 Community and Economic Benefit – The community benefit fund is expected to
be worth £957,000 (29 turbines, each at 6.6 MW, and a community benefit rate of
£5,000 per MW per annum each year), the details of this are provided in the EIAR.  
5.6 The Applicant has worked with West Kintyre, East Kintyre and Campbeltown
Community Councils, and their agent, Kintyre Wind, to develop a community
ownership offering. This has culminated in all three community councils formally
expressing interest in community ownership and signing a Memorandum of
Understanding.  
5.7 Capital Expenditure of the Proposed Development - The EIAR advises that during
the construction phase it is estimated the proposal will generate £68.2 million GVA
in Scotland, of which £28.0 million GVA will be in Argyll & Bute. During the
operational phase it was estimated that the proposal will generate £7.1 million
GVA in Scotland, including £1.4 million GVA in Argyll & Bute, annually.  
5.8 The economic benefits associated with this proposal during construction and the
operational phases relating to job creation and benefits to the local economy are
a relevant consideration, which has been considered. Community Benefit is not
however, a ‘material planning consideration’ in the determination of planning
applications, as there is no planning mechanism available to secure it. If consent
were to be granted, the negotiation of any community benefit either directly with
the local community or under the auspices of the Council, would take place
outside the application process. 
5.9 Having due regard to the above it is considered a degree of net economic
impact including local and community socio-economic benefits typical of
such developments will be provided. It is therefore concluded that the
proposal is consistent with the provisions of Policy 11 – Energy of NPF4
and Policy 30 – The Sustainable Growth of Renewable of LDP2 in this
regard.
Page 148

Page 149

6. IMPACTS ON COMMUNITIES AND INDIVIDUAL DWELLINGS, INCLUDING
RESIDENTIAL AMENITY, VISUAL IMPACT, NOISE AND SHADOW FLICKER  
6.1 Policy 11 – Energy of NPF4 requires that project design and mitigation will
demonstrate how impacts on communities and individual dwellings, including
residential amenity, visual impact, noise, and shadow flicker have been
addressed. Policy 30 – the Sustainable Growth of Renewables of LDP2 requires
all applications for renewable developments to be assessed in terms of impacts
on communities and individual dwellings, including visual impact, residential
amenity noise, and shadow flicker (including cumulative).   
Noise  
6.2 ABC Noise Consultant – initially concluded that, in general, good practice has
been adopted by the Applicant, with a few issues identified. The most significant
of these issues being confirmation there are no derelict residential properties
within the study area was not given. Minor observations included errors in the
reporting of the grid references of baseline noise monitoring locations. 
6.3 The applicant has also applied a lower fixed limit (non-financially involved) of 43
dB LA90 for the night-time period. The Noise Consultant recommends that a lower
fixed limit of 38 dB LA90 is adopted, and the updated values are provided.  
6.4 Following a satisfactory response to the above issues from the Applicant, it is
considered that there would be no reasons to object on noise grounds, subject to
a suitably worded condition to limit the noise levels, tonality and amplitude
modulation being applied to control noise levels from the proposal.  
6.5 Applicant’s response to Noise Consultant – corrected the discrepancies in the
reported grid references of baseline monitoring locations. 
6.6 The Applicant advised that when identifying properties to assess within the study
area a review was undertaken of satellite imagery and OS Address Base data. All
relevant residential properties identified from this process were considered as part
of the noise assessment such that they are not aware of any derelict residential
properties in the vicinity of the proposal.  
6.7 With regard to the proposed noise condition, this looks appropriate in principle
and in general the Applicant is happy to follow best practice guidance when
drafting conditions however they note that the UK Government has just released
a consultation on Assessment and rating of wind turbine noise guidance which
discusses both a consistent night and day-time fixed limit, and inclusion of
Amplitude Modulation. Given this ongoing, and pertinent, consultation they
suggest discussing condition wording later when the updated guidance is in place. 
6.8 ABC Noise Consultant - confirmed that the Applicant’s response is reasonable,
however, they note that there is no guarantee on the timeline of introduction of
the new Government guidance. 
Shadow Flicker  
Page 149

Page 150

6.9 The EIAR considers the potential for significant shadow flicker effects as a result
of the proposal. No properties are predicted to surpass the threshold of 30 hours
per year or 30 minutes per day. No significant effects are predicted, and mitigation
is not required. 
6.10 Having due regard to the above, subject to the conditions recommended by
the Council’s Noise Consultant being attached to any consent it is
considered that the proposal is consistent with the provisions of Policy 11-
Energy, and Policy 30 – The Sustainable Growth of Renewables of the LDP2
in this respect.  
7. SIGNIFICANT LANDSCAPE AND VISUAL IMPACTS  
7.1 Policy 11 – Energy of NPF4 requires that project design and mitigation
demonstrate how significant landscape and visual impacts have been addressed,
recognising that such impacts are to be expected for some forms of renewable
energy. Where impacts are localised and/or appropriate design mitigation has
been applied, they will generally be considered acceptable. Policy 4 a) - Natural
Places of NPF4 states that proposals which by virtue of type, location or scale will
have an unacceptable impact on the natural environment will not be supported.
Policy 30 – The Sustainable Growth of Renewables of LDP2 requires all
applications for wind turbine developments are assessed against landscape and
visual impacts. 
7.2 The Council’s Consultant Landscape Architect - has undertaken a review of the
landscape and visual effects and reached the following conclusions on the
proposal. 
7.3 Significant landscape effects are limited to within 5 km, and visual effects to within
16km, of the site. The proposals have gone through an appropriate design
process, including mitigation where appropriate, followed design advice provided
by Argyll & Bute Council, NatureScot, and Historic Environment Scotland (HES),
and focused on reducing impacts at sensitive receptors. This process is clearly
set out in the EIAR. Key design revisions include a reduction in the number of
turbines from 33 to 29, revision of tip heights from 230m to a mixture of 180m and
200m, relocation of turbines into the interior of the site, away from the highly
sensitive (in landscape and visual terms) coast and residential receptors and
adoption of recommended and currently available aviation lighting mitigation
measures.  
7.4 The design mitigation which has been undertaken has resulted in the following
landscape and visual conclusions in relation to Argyll & Bute the integrity of the
West Kintyre Local Landscape Area (LLA) will not be compromised, no significant
impacts are identified within small-scale glen landscapes, and no significant
effects are identified as a result of aviation lighting  
7.5 It is considered that project and design mitigation has appropriately addressed
the potential significant landscape and visual effects of the proposal.  
7.6 Landscape Impact - Significant effects on landscape character are predicted in
the LVIA for the host Landscape Character Type (LCT) 39: Plateau Moor and
Forest – Argyll (Unit A) comprising significant (Major) direct effects within the site
and significant indirect effects within 2km of the site during the construction phase.
Similarly, during the operational phase significant (Major) direct effects were
Page 150

Page 151

found within 2km and significant (Moderate) indirect effects within no more than
5km. The nature of the surrounding forested plateau landscape on which Cnoc
Buidhe is located helps the development to fit into the broader Kintyre peninsula
in a reasonably unobtrusive fashion and the Councils Consultant Landscape
Architect agrees with this assessment.  
7.7 No significant effects were found within the LVIA for any of the other LCTs within
the study area. The Council’s Consultant Landscape Architect broadly agrees
with the assessment. However, it is worth noting that LCT 55 which covers the
island of Gigha currently has a character of seclusion and the proposal would
noticeably increase the visibility of large-scale development from many southern
parts of the island.  
7.8 No significant effects on locally or nationally designated landscapes were
identified in the LVIA, including the North Arran NSA, the East Kintyre (Coast)
LLA, the West Kintyre (Coast) LLA and the Mull of Kintyre LLA and the Council’s
Consultant Landscape Architect agrees with these judgements.  
7.9 Visual Impact - Significant (Major) visual effects are predicted at Viewpoint 2:
Lussa Loch Dam. Significant (Moderate) effects extend to over 15km from the
proposal for the current baseline assessment and are predicted for 12 other
viewpoints: 1, 3, 4, 5, 7, 8, 11, 13, 14, 15, 16 and 17. Significant effects are
predicted for people within the settlements of Glenbarr (Moderate) and
Machrihanish (Moderate).  
7.10 Significant sequential effects (Moderate) are predicted for the Tayinloan – Gigha
Ferry Route. Significant sequential effects are also predicted for very localised
sections of the Kintyre Way in the vicinity of Lussa Loch (Major) and a localised
section of the route in the vicinity of Rhunahaorine Point (Moderate). However,
effects on the Kintyre Way when considered as a whole, are assessed to be not
significant.  
7.11 Significant (Major) effects are predicted for core paths between Campbeltown and
Bridgend via Lussa Loch and significant (Moderate) effects are predicted for the
core path between Machrihanish and Westport and the Glenbarr school route.
Localised, significant effects are predicted from Core Paths (C088j, C088k, and
C088l) as they traverse the western shore of Lussa Loch, but the overall
sequential visual effect will be minor.  
7.12 Overall, the Council’s Consultant Landscape Architect agrees with the approach
and findings of the visual assessment and believes the proposal would result in
relatively limited visual effects thanks to the design strategy evidenced in the
Design & Access Statement accompanying the EIAR.  
7.13 However, it could be argued, that the sequential effects on the A83 and the
promoted Kintyre 66 route have been underestimated, due to the susceptibility of
the receptors being assessed as medium. The Council’s Consultant Landscape
Architect believes it is likely there would be localised significant effects on the
users of this route. The Council’s Consultant Landscape Architect also considers
the significance of effects on road users in Viewpoint 4 could be judged as
moderate (significant) rather than minor as currently reported, for the same
reasons. The Planning and Renewable Energy Statement (PRES) accompanying
Page 151

Page 152

the EIAR appears in places misleading in the way it summarises the significant
visual effects.  
7.14 Cumulative - Significant cumulative effects on landscape character are predicted
for the host LCT 39: Plateau Moor and Forest – Argyll (Unit A). Significant
cumulative effects on visual receptors are predicted for Viewpoints 1, 3, 4 and 5
under both Scenario 1 and 2 future baselines. The LVIA highlights that significant
visual effects identified under the current baseline assessment are predicted to
reduce to not significant for a number of receptors (including 8 viewpoints) under
the Scenario 1 future baseline (most certain one) as well as Scenario 2 future
baseline. This means the significant visual effects would be contained within 7km,
rather than over 15km for the current baseline. The contribution of the proposal
to total cumulative effects is not judged to be significant.  
7.15 Residential Visual Amenity Assessment (RVAA) - concludes there will be no
properties where views of the proposal would affect the living conditions or breach
the residential visual amenity threshold. Concerns raised regarding
photomontages from Drumore Na Bodach and Bellochantuy Beach have been
submitted to the ECU. The Council’s Landscape Consultant has reviewed these
concerns and is content that no further consideration is required.  
7.16 Mitigation - Measures to reduce effects on the landscape resource, views and
visual amenity were achieved through the design of the proposal. A total of
568.8ha will be felled to construct the proposal. The species composition of the
forest on site would change because of the proposal including a net reduction in
Sitka spruce of 242.3ha, an increase in broadleaf woodland of 6.4 ha and an
increase in peatland restoration of 88.1 ha. The location and composition of the
additional 147.8 ha of the compensatory planting is to be agreed with Scottish
Forestry.  
7.17 Aviation lighting mitigation - options are addressed within the Aviation Lighting
and Mitigation Report. In summary, a reduced visible lighting scheme is proposed
in addition to infrared lighting. The visible lighting is proposed to automatically
reduce in intensity depending on the visibility conditions (automatic dimming). The
Applicant is also committed to the implementation of vertical directional intensity
mitigation (LEDs which are designed to minimise the light spillage and over-
brightness).  
7.18 Review against NPF4 Policy - The NPF4 national spatial strategy acknowledges
the need for a rapid transformation across all sectors of our economy and society
in order to meet our climate ambitions. At the same time, it stresses the
importance of ‘ensuring the right development happens in the right place.’ The
following paragraphs provide a review by the Councils Consultant Landscape
Architect of the proposal in relation to the most relevant NPF4 policies.  
7.19 Policy 4 d) states that development proposals that affect a site designated as a
local landscape area in the LDP will only be supported where: i. Development will
not have significant adverse effects on the integrity of the area or the qualities for
which it has been identified; or ii. Any significant adverse effects on the integrity
of the area are clearly outweighed by social, environmental, or economic benefits
of at least local importance.  
Page 152

Page 153

7.20 As no special qualities relating to the LLAs have been defined by Argyll & Bute
Council, the EIAR used key characteristics of the local landscape character to
assess effects of the proposal on the LLAs, which the Council’s Consultant
Landscape Architect considers to be a reasonable approach.  
7.21 There would be localised direct effects on the West Kintyre (Coast) Local
Landscape Area (LLA) where the site access meets the A83. The EIAR predicts
the proposal will introduce turbines to inland views from a limited geographical
extent of the LLA. Theoretical visibility will be restricted due to complex landform.
Whilst localised significant indirect effects are predicted from within the LLA (e.g.
moderate effect from Viewpoint 1 and 3), key views along the coast and
westwards towards the open sea and islands will be largely unaffected. The
introduction of the proposal is not anticipated to affect the integrity of the LLA, and
the Council’s Consultant Landscape Architect agrees with this conclusion.  
7.22 Mull of Kintyre LLA is located 12km to the south. No viewpoints have been
provided in the EIAR which lie within the LLA, but Viewpoints 11 and 13 are
located in the vicinity of it and these point to potential for localised significant
effects from the LLA. The EIAR acknowledges that, where visible, the proposal
would increase the horizontal extent and scale of wind turbines in relatively distant
views and would be seen above the skyline of central Kintyre. However, given the
context of existing wind development on the Kintyre spine, the intervening
distance, and the limited theoretical visibility from within the LLA, it concludes that
the introduction of the proposal will not affect the integrity of the LLA and the
Council’s Consultant Landscape Architect agrees with this conclusion.  
7.23 In terms of cumulative effects, the EIAR acknowledges that the proposal would
intensify indirect effects on localised areas of the West Kintyre (Coast) and Mull
of Kintyre LLAs.  
7.24 Policy 11 - Policy 11 e) requires project design and mitigation to demonstrate how
impacts on communities and individual dwellings as well as significant landscape
and visual impacts are addressed. In terms of significant landscape and visual
impacts, 11e ii states that such impacts are to be expected for some forms of
renewable energy and where impacts are localised and/or appropriate design
mitigation has been applied, they will generally be considered acceptable. NPF4
provides no guidance on the definition of what constitutes ‘localised’ effects.  
7.25 Details in relation to the iterative design process and embedded mitigation,
relevant to the LVIA are provided in the Design & Access Statement and Chapter
3 - Site Selection and Design Strategy. A number of design objectives which
guided the design related to limiting landscape and visual effects and applying
appropriate design mitigations, such that significant landscape and visual impacts
could be considered generally acceptable. One of the design objectives related
to minimising effects on residential visual amenity at the closest residential
properties (Corrylach and Dorran Cottage to the east, and Drumore na bodach to
the west) by maintaining at least a 1 km buffer between properties and turbines.
RVAA concludes that there will be no properties where views of the proposals
would affect the living conditions or breach the residential visual amenity
threshold.  
7.26 The preliminary design included 33 turbines of up to 230m height, while the final
layout comprises 29 turbines of reduced scale (14 up to 180m tip height and 15
up to 200m tip height). The EIAR does demonstrate that significant impacts have
Page 153

Page 154

been reduced through appropriate design mitigation, as illustrated by the
comparison wirelines in Figures 3.1 to 3.5.  
7.27 Further reductions in effect significance could potentially be achieved through the
removal of turbines, which would result in reduced output. However, the Councils
Consultant Landscape Architect has reviewed the problematic turbines (e.g.
causing stacking or spoiling the balance of the visible layout) in various views and,
as they differ, it would be difficult to achieve a meaningful reduction in effects
across the study area without removing a large proportion of the turbines, likely
affecting the scheme’s output and viability.  
7.28 For example, removing a single turbine (T10) would likely reduce the effects from
Viewpoint 1 (Bellochantuy), however, approx. 9 different turbines would need to
be removed to meaningfully reduce effects from Lussa Loch Dam (Viewpoint 2).
Removing turbines T1, T2 and T6 would help slightly reduce visual effects from
Killegruer Caravan Site, A83 (Viewpoint 3), while removing turbines T2, T4, T12
and T15 would help reduce effects from Glenbarr (Viewpoint 4). However, most
of the effects at short-range would still likely remain significant. In addition,
removing all of those turbines would likely result in problematic gaps in previously
balanced layouts visible from other directions.  
7.29 Reductions in effect significance could potentially also be achieved through the
reduction in size and changes in spacing of the turbines, however, Figure 3
Constraints suggests that there is limited scope for relocating turbines. As for
reduction in tip height, the final proposal increases the vertical extent of existing
wind energy development in some views, but in other views appears to fit the
visual context in terms of scale quite well. As such, the Councils Consultant
Landscape Architect is not convinced the reduction in size would yield meaningful
reductions in levels of visual effects.  
7.30 The significant residual landscape effects can be considered ‘localised,’ as they
are assessed to occur within up to around 5km from the proposal and the
Council’s Consultant Landscape Architect agrees with this assessment.  
7.31 Significant visual effects for the proposal on its own extend to over 15km and are
predicted for thirteen viewpoints. However, under the cumulative Scenario 1
(which is considered the most certain future baseline scenario and includes the
consented Tangy IV Wind Farm), the EIAR predicts that significant visual effects
would reduce for several receptors including 8 viewpoints and would be contained
within approx. 7km of the proposal. As such, the visual effects could potentially
be considered ‘localised,’ and it could be difficult to argue the proposals do not
comply with Policy 11e.  
7.32 Having reviewed several recent wind energy development decisions, the key
NPF4 test in relation to the acceptability of wind farm proposals appears to be
‘the right development in the right place’. Given the location of the proposal within
an existing wind farm cluster, amid low landscape value commercial forestry and
away from the sensitive Kintyre coastline, it is the Councils Consultant Landscape
Architects opinion the proposal passes that test.  
7.33 Key Viewpoints to be considered by the Planning Committee include Viewpoint 1:
Bellochantuy, Viewpoint 2: Lussa Loch Dam, Viewpoint 3: Killegruer Caravan
Site, A83, Viewpoint 4: Glenbarr War Memorial, A83, Viewpoint 5: Beinn Bhreac,
Page 154

Page 155

Kintyre, Viewpoint 7: Machrihanish Beach, Viewpoint 8: Machrihanish, B843,
Viewpoint 14: South Pier, Gigha, Viewpoint 21: Beinn Bharrain, Arran.  
7.34 NatureScot have deferred to Argyll & Bute Council and North Ayrshire Council in
terms of effects on locally designated landscapes. 
7.35 North Ayrshire Council - advised the ECU that consideration should be given to
the potential impacts of the North Arran NSA.   
Officer’s Conclusion  
7.36 Based on the expert advice of the Council’s Consultant Landscape Architect, and
NatureScot it is concluded the proposal does not warrant an objection on
landscape and visual grounds. This is however subject to a condition being
attached to any consent to secure an Aircraft Detection Lighting System (ADLS),
as an additional mitigation measure in regard to visible aviation lighting. This
additional measure is recommended by NatureScot in their response to the ECU.  
7.37 Having due regard to the above subject to an ADLS condition being
attached to any consent it is concluded that the proposal complies with the
provisions of Policies 11 – Energy and 4 – Natural Places of NPF4, and
Policy 30 – The Sustainable Growth of Renewables of LDP2 in this respect.  
8. IMPACTS ON TOURISM AND RECREATION    
8.1 Policy 11 – Energy of NPF4 does not require impacts on tourism to be considered.
Policy 30 – The Sustainable Growth of Renewables of LDP2 requires all
applications for wind turbine developments to be assessed against impacts on
tourism and recreation.  
8.2 Tourism – Policy 11 of NPF4 does not include a requirement for the impact of
proposals on tourism to be assessed. However, Policy 30 – The Sustainable
Growth of Renewables of the LDP does. In Argyll & Bute the landscape is
regarded as being a particularly valued asset both in terms of its intrinsic qualities
and in terms of its value to the tourism economy. For all types of development,
the maintenance of landscape character is an important facet of decision-making
in the countryside in Argyll & Bute, regardless of the scale of development
proposed.  
8.3 As Tourism and Landscape & Visual matters are intrinsically linked, and there is
little evidence to demonstrate whether wind farms adversely affect tourism, it is
considered that such impacts are covered in the landscape and visual impact
assessment of the proposal. 
8.4 Having due regard to the above it is considered that the proposal is
consistent with the provisions of Policy 11 – Energy of NPF4 and Policies
04 – Sustainable Development and 30 – The Sustainable Growth of
Renewables of ABLDP2 in this respect.  
9. PUBLIC ACCESS    
Page 155

Page 156

9.1 Policy 11 – Energy of NPF4 requires that project design and mitigation
demonstrate how impacts on public access are addressed, including impact on
long distance walking, and cycling routes and scenic routes. Policy 30 – the
Sustainable Growth of Renewables of LDP2 requires all applications for wind
turbine developments to be assessed against impacts on public access, including
impact on long distance walking and cycling routes and those scenic routes
identified in NPF4. Policy 32 – Active Travel of LDP2 requires active travel and
recreation to be integrated in developments from the start of the wider design
process and existing active travel networks should be safeguarded and integrated
with the development. 
9.2 British Horse Society have provided advice to the ECU on Outdoor Access
management for equestrian users during the construction and when the wind farm
is operational. They have also provided guidance on managing woodland and
forestry access and guidance to drivers of large vehicles.  
9.3 The Council’s Access Officer – has no objection in respect to Public Access
subject to advisory notes being attached to any consent to ensure that any Access
Controls i.e. gates, and cattle grids comply with the British Horse Society
Guidance. Furthermore, that public access during construction should comply
with NatureScot guidance ‘Good practice during wind farm construction.’  
9.4 Having due regard to the above subject to the ECU advising the Applicant
to follow guidance provided by the British Horse Society and NatureScot in
the event that consent is granted, it is considered the proposal is consistent
with the provisions of Policy 11- Energy of NPF4, Policy 30 – the Sustainable
Growth of Renewables; and Policy 32 - Active Travel of the LDP2.  
10. AVIATION AND DEFENCE INTERESTS INCLUDING SEISMOLOGICAL
RECORDING   
10.1 Policy 11 – Energy of NPF4 requires that project design and mitigation
demonstrate how impacts on aviation and defence interests including
seismological recording have been addressed. Policy 30 – the Sustainable
Growth of Renewables of LDP2 requires impacts on aviation and defence
interests and seismological recording to be addressed. Policy 43 – Safeguarding
of Aerodromes of LDP2 stipulates that development will not be permitted where it
would compromise the safe operation of an Aerodrome or Technical Site or
constrain their present or future operations.  
10.2 Defence Infrastructure Organisation (DIO) – advised the ECU that, subject to
conditions to secure Aviation Lighting and Aviation Charting and Safety
Management they have no objection.  
10.3 Highlands & Islands Airport advised the ECU that following submission of an
updated Instruments Flight Procedure Assessment they have no objection subject
to a condition to secure confirmation from the operator of Campbeltown Airport
that an Instrument Flight Procedure Assessment has demonstrated that an IFP
Scheme is not required or an IFP Scheme has been approved by the Airport
Operator and the Civil Aviation Authority has confirmed its approval and it has
been submitted to NATS in the interests of aviation safety to secure mitigation
and ensure the development does not alter traffic patterns or impact the safety of
Campbeltown Airport.
Page 156

Page 157

10.4 The Applicant has confirmed they are content with HIAL’s proposed condition,
subject to final confirmation of the full suite of conditions with the ECU should
consent be forthcoming.  
10.5 National Air Traffic Services Safeguarding (NATS) initially advised the ECU the
proposal conflicted with their safeguarding criteria due to potential for
unacceptable impacts on the operation of the primary radar located Lowther Hill
and associated air traffic management operations. Accordingly, they objected. It
has subsequently been agreed with the ECU that the NATS Safeguarding
objection is withdrawn on the basis that should the Scottish Ministers decide to
grant consent an appropriately worded condition will be imposed which will
mitigate the unacceptable impacts on the operation of the primary radar located
at Lowther Hill and associated air traffic management operations.  
10.6 Glasgow Prestwick Airport have advised the ECU they have no objection.  
10.7 Having due regard to the above and subject to the conditions required by
Defence Infrastructure Organisation, National Air Traffic Services and
Highlands & Islands Airport it is concluded the proposal is consistent with
the provisions of Policy 11 – Energy of NPF4 and Policies 30 – The
Sustainable Growth of Renewables and 43 – Safeguarding of Aerodromes,
of the LDP2.  
11. TELECOMMUNICATIONS AND BROADCASTING INSTALLATIONS  
11.1 Policy 11 – Energy of NPF4 requires that project design and mitigation
demonstrate how impacts on telecommunications and broadcasting installations,
have been addressed particularly, ensuring that transmission links are not
compromised. Policy 30 – The Sustainable Growth of Renewables of LDP2
requires all applications for wind turbine developments to be assessed against
impacts on telecommunications and broadcasting installations, particularly
ensuring that transmission links are not compromised. 
11.2  BT advised the ECU the proposal should not cause interference to BT’s current
and presently planned radio network. BT require 100m minimum clearance from
any structure to the radio link path. Joint Radio Company - advised the ECU the
proposal is CLEARED - subject to 50m Micrositing with respect to radio link
infrastructure operated by the local energy networks. Vodaphone have advised
they have no comment.  
11.3 Having due regard to the above subject to the conditions recommended by
BT, and the Joint Radio Company it is concluded that the proposal will not
have any adverse impacts on telecommunications, broadcasting
installations and transmission links (including cumulative impacts) and is
consistent with the provisions of Policy 11- Energy of NPF4 and Policy 30 –
The Sustainable Growth of Renewables of LDP2 in this respect.    
12. ROAD TRAFFIC AND ADJACENT TRUNK ROADS    
12.1 Policy 11 – Energy of NPF4 requires that project design and mitigation
demonstrate how impacts on road traffic and on adjacent trunk roads have been
Page 157

Page 158

addressed, including during construction. Policy 30 – the Sustainable Growth of
Renewables of LDP2 requires all applications for wind turbine developments to
be assessed against impacts on road traffic and impacts on adjacent trunk roads.
Policy 35 – Design of New and Existing, Public Roads and Private Access
Regimes of LDP2 acceptance of development utilising new and existing public
roads, private roads and private access regimes is subject to road safety and
street design issues being addressed to the satisfaction of the Roads Authority
and the Planning Authority. Policy 38 – Construction Standards for Public Roads
requires that accesses which connect to or impact significantly on a Trunk Road
require consultation with Transport Scotland.  
12.2 Transport Scotland (TS) have advised the ECU they have no objection subject to
conditions being attached to any consent to secure submission and approval of a
Construction Traffic Management Plan (CTMP), the route for abnormal loads,
abnormal load accommodation measures required, and any necessary additional
signing or temporary traffic control measures. In addition to the advisory notes are
provided relating to works within the trunk road boundary.  
12.3 ABC Roads and Infrastructure Services (RIS) – The site connects directly to the
A83 Tarbet to Campbeltown Trunk Road approximately 1 mile north of
Bellochantuy, Transport Scotland should be notified. RIS note that this junction
“will provide access to the proposal for all abnormal loads associated with the
turbine deliveries, as well as access for Heavy Goods Vehicles (HGVs) delivering
construction materials and general site traffic” with traffic travelling north and
south on the A83(T) through to the junction. 
12.4 Significant volumes of material are required to support construction includes
construction of circa 18km of new access track and 10km of upgraded track.
Whilst it is noted that the Applicant recognises “To seek opportunities to obtain
site-won stone for construction purposes and thereby minimising construction
traffic volumes through exploring borrow pit options” RIS further notes that the
borrow pit assessment concludes “The borrow pit has the potential to provide
approximately 45% of the estimated aggregate requirement for the Proposed
Development (minus concrete aggregate) assuming 50% suitability of excavated
material”. RIS is therefore concerned about the possible impact of this proposal
on the local road network.  
12.5 RIS have no objection subject to conditions to ensure that the site is accessed
from the A83 Tarbet to Campbeltown Trunk Road. Strictly no direct access from
any Argyll & Bute Council Road and a Traffic Management Plan is to be submitted
for approval by RIS, prior to any work starting on site. The Traffic Management
plan should include details of all materials, plant, equipment, components, and
labour required during the construction works. Note - Depending on the TMP, RIS
may require road condition surveys to be conducted. The condition surveys to be
recorded by means of video and photographs, and a copy of the video and
photographs to be submitted to RIS, for approval, prior to any work starting on
site.  
12.6 Having due regard to the above, subject to the conditions recommended by
Transport Scotland and Roads & Infrastructure Services it is considered
that the proposal is consistent with the provisions of Policy 11 – Energy of
NPF4, Policy 30 – The Sustainable Growth of Renewables, Policy 35 –
Design of New and Existing, Public Roads and Private Access Regimes and
Policy 38 – Construction Standards for Public Roads in this regard.  It is
Page 158

Page 159

recommended that the conditions required by Area Roads and Amenity
Services are attached to any consent granted by the ECU. 
13. HISTORIC ENVIRONMENT    
13.1 Policy 11 – Energy of NPF4 requires that project design and mitigation
demonstrate how impacts on the historic environment have been addressed.
Policy 7 – Historic Assets and Places of NPF4 intent is to protect and enhance
historic environment assets and places, and to enable positive change as a
catalyst for the regeneration of places. Policy 30 – The Sustainable Growth of
Renewables of LDP2 requires all applications for wind turbine developments to
be assessed against impacts on the historic environment, including scheduled
monuments, listed buildings and their settings. Policy 15 – Protection,
Conservation and Enhancement of Our Historic Environment, Policy 19 –
Scheduled Monuments, Policy 20 – Gardens and Designed Landscapes, and
Policy 21 – Sites of Archaeological Importance support the key policies and
provide guidance on assessing development proposals against heritage impacts. 
13.2 Historic Environment Scotland (HES) – advised the ECU the proposal does not
raise historic environment issues of national significance, and they do not object
subject to conditions. Scheduled Monument Consent may be required for some
of the forestry works which require felling adjacent to Killocraw cup marked stone.
Dun a’ Bhuic, dun SW of Cleongart sits close to an existing forestry access track
which will be used as the main access route for the wind farm. HES recommend
a condition is attached to any consent to ensure that Dun a’Bhuic dun SW of
Cleongart is fenced off to mitigate the risk of accidental damage during
construction. With these issues address HES are content that there should be no
adverse physical impact upon assets within their remit resulting from the proposal. 
13.3 West of Scotland Archaeology Service – have advised they have no objection to
the proposal subject to a condition to secure a Written Scheme of Investigation
(WSI) for archaeological mitigation measures and also ask that the Applicant be
advised to ensure that they have all necessary legal permissions for any elements
of their archaeological mitigation that lie out with the planning system. 
Specifically, in regard to the RAF Hudson aircraft crash site mitigation proposals
which may require a license from the MoD if it is to be disturbed. 
13.4 Having due regard to the above subject to the conditions and advisory note
to address the concerns of Historic Scotland (protective fencing) and the
West of Scotland Archaeology Service it is considered that the proposal is
consistent with the provisions of Policy 11 – Energy and Policy 7 – Historic
Assets and Places of NPF4, and Policies 30 – The Sustainable Growth of
Renewables; 15 – Protection, Conservation and Enhancement of Our
Historic Environment; 19 – Scheduled Monuments; 20 – Gardens and
Designed Landscapes; and 21 – Sites of Archaeological Importance of the
LDP2  
14. HYDROLOGY, THE WATER ENVIRONMENT AND FLOOD RISK  
14.1 Policy 11 – Energy of NPF4 requires that project design and mitigation
demonstrate how effects on hydrology, the water environment and flood risk have
been addressed. Policy 30 – Supporting the Sustainable Growth of Renewables
of LDP2 requires all applications for wind turbine developments to be assessed
Page 159

Page 160

against impacts arising from effects on hydrology, the water environment and
flood risk (including cumulative). Policy 55 - Flooding of LDP2 provides guidance
on the type of development that will be permissible within specific flood risk areas.
Policy 57 – Risk Appraisals requires flood risk assessments, and drainage impact
assessments, to accompany applications where required.  
14.2 The Council’s Flood Prevention Officer – has advised they have no objection
subject to conditions to ensure that any proposed watercourse crossings are
designed to convey the 1 in 200 year plus climate change flood event and that
surface water drainage is designed in accordance with CIRIA C753 and ensure
that post development surface water runoff does not exceed the pre-development
surface water runoff. The surface water drainage should be in operation prior to
the start of construction.  
14.3 Having due regard to the above, subject to the conditions recommended by
the Flood Prevention Officer it is concluded that the proposal is consistent
with the provisions of Policy 11 – Energy of NPF 4, Policy 30 – The
Sustainable Growth of Renewables, Policy 55 – Flooding; and Policy 57 Risk
Appraisals of LDP2.    
15. BIODIVERSITY    
15.1 Policy 11 – Energy of NPF4 requires that project design and mitigation
demonstrate how impacts on biodiversity, including birds have been addressed.
Policy 1 – Tackling the climate and nature crises of NPF4 requires that when
considering all proposals significant weight will be given to the global climate and
nature crises. Policy 3 – Biodiversity of NPF4 requires proposals to protect
biodiversity, reverse biodiversity loss, deliver positive effects from development
and strengthen nature networks. Policy 5 – Soils of NPF4 supports the generation
of energy from renewable sources that optimises the contribution of the area to
GHG emissions reduction targets on peatland, carbon-rich soils, and priority
peatland. A detailed site-specific assessment will be required for development on
peatland which will include the net effects of the development on climate
emissions and loss of carbon. Policy 30 – The Sustainable Growth of Renewables
of LDP2 requires all applications for wind turbine developments to be assessed
against impacts arising from effects on the natural heritage, including birds and to
be assessed against impacts on carbon rich soils, using the carbon calculator
(including cumulative). Policy 73 – Development Impact on Habitats, Species and
Biodiversity requires proposals to incorporate, safeguard and enhance existing
site biodiversity wherever possible. 
15.2 NatureScot initially advised the ECU they objected until further information was
obtained from the Applicant on barrier effects on the Kintyre Goose Roosts SPA.
Once this was provided, they would give the proposal further consideration. In
respect to disturbance effects they object unless conditions to control the timing
of borrow pit blasting activities are applied to any consent to ensure works are
undertaken to avoid significant disturbance of wintering Greenland white-fronted
geese roosting in Lussa Loch. 
15.3 Golden eagle – NatureScot do not consider the effects of habitat/range
loss/territory impact for golden eagle have been adequately assessed. A kernel
analysis of the most recent full year (minimum) is required to help them
understand the extent of this territory. 
Page 160

Page 161

15.4 Osprey – to reduce the risk of collision mortality, NatureScot advise that
alternative osprey nesting platforms should be provided further away from the
proposal to reduce the risk of collision mortality i.e. to the east of Lussa Loch.  
15.5 Outline Construction Environmental Management Plan (OCEMP) & subsidiary
plans - NatureScot advised that the proposals contained in the OCEMP appear
to be broadly appropriate for pollution prevention, protection of protected species
and sensitive bird interests and biodiversity enhancement.  
15.6 NatureScot also provided advice on the Kintyre Goose Lochs SSSI, Bellachantuy
and Tangy Gorges SSSI/GCR. 
15.7 Additional Ornithological Information was submitted by the Applicant in relation to
barrier effects on the Kintyre Goose Roosts SPA  
15.8 NatureScot considered the Additional Information and provided further advice to
the ECU in relation to potential barrier effects to Greenland white-fronted goose,
part of the Kintyre Goose Roosts Special Protection Area (SPA). They advised
that they object unless the proposal is amended/made subject to conditions so
that works are done strictly in accordance with their required changes/mitigation.  
15.9 Golden eagle – NatureScot also noted that the Applicant had not submitted
previously requested kernel analysis of the most recent full year of satellite tag
data for golden eagle. Their advice remains that until this information is submitted,
they cannot make a full assessment of the likely effect of the proposal on golden
eagle.  
15.10 Habitats Regulations – they advise that as the proposal could affect the Kintyre
Goose Roosts Special Protection Area (SPA) the site’s status means the
requirements of the Conservation (Natural Habitats &c) Regulations apply, and
the ECU is required to consider the effect of the proposal on the SPA by carrying
out an appropriate assessment before it can be consented. Kintyre Goose Roosts
Ramsar site and Kintyre Goose Lochs SSSI may also be affected but the interests
of these designations are fully addressed as part of the consideration of the SPA.
To help the ECU do this NatureScot have advised that if the proposal is
undertaken strictly in accordance with the following changes/mitigation, the
proposal will not adversely affect the integrity of the site. 
Changes - the proposal shall be amended to remove the five most southwest
turbines, 15, 24, 26, 28 and 29. Reason: to maintain a clear functional ‘corridor’
to accommodate the displacement effect on the established flight path between
Tangy Loch and Glenbarr. 
Mitigation - A programme of Post Construction Monitoring shall be created and
funded by the Applicant for satellite tagging of Greenland white-fronted geese in
the area, subject to agreement with NatureScot, for at least two years post
commissioning. Reason: to help understand cumulative barrier effects arising
from the proposal on Greenland white-fronted geese.  
15.11 Clarification Note from Applicant – the Applicant provided a response to
NatureScot’s objection. This response focuses on the fact that NatureScot’s
objection is due to cumulative barrier effects from Cnoc Buidhe with the consented
Page 161

Page 162

Tangy IV. The Applicant has proposed a condition that only requires the turbines
to be removed in the event that Tangy IV is constructed. Furthermore, that in the
event Tangy IV is constructed or the consent remains valid at the time of
construction of Cnoc Buidhe that they would then remove the 5 turbines. The
Applicant has provided an assessment which concludes that the proposed
condition complies with all of the tests set out in Scottish Government Circular
4/1998 “The use of conditions in planning permissions” and that it can be used to
address NatureScot’s objection. 
15.12 The proposed condition is: 
1(i) “Subject to condition 1(ii)Turbines X/Y shall not be erected without the written
consent of the Planning Authority following consultation with NatureScot. 
1(ii) Condition 1(i) shall not apply if the consent issued by the Scottish Ministers
for Tangy IV Wind Farm on 20th December 2019 ceases to be capable of lawful
implementation before any of the turbines permitted by the consent have been
erected.  
15.13 Sub-paragraph (i) restricts the erection of the affected turbines, to address
NatureScot’s concerns. Sub paragraph (ii) removes that restriction if there is no
longer potential for cumulative barrier effects because the Tangy IV consent is
not implemented.  
15.14 NatureScot provided a further response to the Applicant’s Clarification note.  
15.15 Condition – in principle NatureScot are happy to work towards agreeing a
condition. However, they have concerns with the condition proposed. It is
NatureScot’s understanding that the number of turbines at Tangy (16) has been
established and this will not be revisited by the Tangy variation application. There
is therefore no mechanism to reduce the number of turbines in Tangy IV
(consented or varied). Consequently, the proposed condition is not appropriate in
this case.  
15.16 If a condition is to be applied, 1(ii) should include wording that also refers to any
Varied Development that may be consented at Tangy IV as a result of a Variation
Application, given that the principle of the proposal comprising 16 turbines is
already established and cannot be varied by the Consenting Authority, unless
made subject of a Variation Application by the Applicant. It remains NatureScot’s
view that the only means to secure the mitigation they deem necessary is the
removal of five turbines from the Cnoc Buidhe proposal. The responsibility for
determining the most appropriate mechanism to secure this mitigation lies with
the ECU and Argyll & Bute Council.  
15.17 The Applicant asks whether their proposed condition is sufficient for NatureScot
to “remove their objection.”  This is a misunderstanding of NatureScots position.
The purpose of a conditioned objection is to secure changes/mitigation that NS
deem necessary to protect nationally and/or internationally important natural
heritage interests. Their response has the status of an objection if conditions to
secure mitigation are not attached to any consent granted by Scottish Ministers.
Consequently, the objection cannot be removed by providing the wording of the
condition. It is the act of applying the condition to any consent that will have the
effect of removing it.
Page 162

Page 163

15.18 RSPB Scotland – advised the ECU they have no comment.   
15.19 SEPA – initially advised the ECU they objected due to impacts on peat and that
they would reconsider their position if the proposals were modified to address
issues relating to the relocation of T1, T3, T5, T7, T14 and T27 to shallower peat,
modification of T3 track layout, relocation of the track to T25.  In addition, SEPA
request conditions relating to enabling works, geotechnical clerk of works,
construction, and environment management plan, borrow pits – scheme of works,
forestry, peat and carbon rich soils, and decommissioning, restoration and
aftercare are attached to any consent. If these will not be applied, then SEPA
object.  
15.20 The Applicant provided a justification note to SEPA – it contains plans showing
adjusted locations, with reduced peat impacts, of the infrastructure identified in
SEPA’s response. The adjusted infrastructure locations are all contained within
micrositing allowances assessed as part of the S36 application and so no
additional environmental impacts requiring assessment result.  
15.21 SEPA considered the justification note and advised the ECU they withdraw their
objection subject to conditions outlined in their previous response and a further
micrositing condition. If these will not be applied, then SEPA object.   
Peat Landslide Hazard Risk Assessment    
15.22 Ironside Farrar, Peat Landslide Hazard Risk Assessment (PLHRA), Stage 1
Checking Report advised the ECU that the PLHRA required minor revisions. The
Applicant provided a response to their comments and at time of writing no further
response has been received from Ironside Farrar. Consequently, it is not possible
to reach a conclusion on the acceptability of the proposal in this regard.  
15.23 The Council’s Local Biodiversity Officer (LBO) initially requested further
information and amendment: the Plantlife survey including mitigation and
proposed enhancement along Drumore Burn, relocation of the hardstand area
near T29 to avoid sensitive habitat, fish and Fresh Water Pearl Mussel surveys,
a Species Protection Plan to include mitigation for bats, small pearl-bordered
fritillary butterfly, reptiles and amphibians. Fish and freshwater pearl mussel
should also be included, dependant on the results of the surveys, and a more
detailed Biodiversity Enhancement Plan including details of riparian planting in
the Drumore Burn Regeneration Management Area, monitoring and management
of planted tree species, and management of deer. The applicant should also
consider opportunities to enhance habitat for small pearl bordered fritillary
butterfly and potential inclusion of hibernacula for reptiles and amphibians.  
15.24 Response from Applicant – provided further information on Drumore Burn and
advised the list of species identified during Plantlife’s Survey are contained in the
Habitats and Vegetation Survey Report in the EIAR. The assessment of impacts
on the Atlantic Temperate Rainforest along Drumore Burn are presented in
Chapter 7 - Ecology. No Significant effects are identified from this assessment
and so no additional mitigation is considered necessary. Details on the proposed
enhancement are provided in– Biodiversity Enhancement Strategy. 
Page 163

Page 164

Regarding T29’s hardstanding and GWDTEs - no part of T29’s hardstanding is
sited on NVC Habitat. There are other items of infrastructure within the site which
overlap with Habitats of Conservation Concern, totalling a loss of 5.74 ha within
the Ecological Study Area. Assessment of impacts on Habitats of Conservation
Concern is presented in Chapter 7 – Ecology and concludes a Negligible
Significance. Conversely 177.50 ha of Peatland Restoration is proposed as part
of the Biodiversity Enhancement measures for which a Minor Positive EIA effect
is concluded. 
Fish and Freshwater pearl mussels - were scoped out and are not included in the
EIAR. Pre-construction fish habitat surveys will ensure watercourse crossings are
microsited and habitat features retained or reinstated, as necessary. An
Ecological Clerk of Works will supervise the construction of crossings, and post-
construction fish habitat surveys and monitoring will be undertaken to ensure
mitigation measures are effective  
15.25 The Local Biodiversity Officer provided the following further advice: 
15.26 The LBO notes that NatureScot are holding an objection until further information
is received and subject to conditions. The Applicant should continue discussions
with NatureScot.  
15.27 Atlantic temperate rainforest is present along the Drumore Burn, immediately
adjacent to the site and may be indirectly impacted upon. The LBO notes Plantlife
conducted a survey to determine the presence of lichens and bryophytes along
Drumore Burn. It appears this survey has not been submitted. The Construction
Environment Management Plan (CEMP) must include strict mitigation
measures to ensure no impact upon this sensitive area from the proposal.  
15.28 The LBO notes the Applicant is in discussions with SEPA and NatureScot. SEPA
have submitted an objection but will reconsider should the proposal be modified
to avoid impacting deep peat. The LBO asks that these discussions continue. As
per NPF4 Policy 5, the mitigation hierarchy should be adhered to, with areas of
deep peat avoided in the first instance.  
15.29 Recommendation: The LBO notes a programme of bat mortality monitoring
is proposed with information feeding into mitigation measures, including
feathering and curtailment, to ensure any negative impacts to foraging /
commuting bats is minimal. However, as there are a high number of
Pipistrelle spp. recorded within the site, the LBO asks that these mitigation
measures are employed as a matter of course where high number of bats
were recorded. 
(a) Reduced rotation speed while idling 
The reduction in speed resulting from feathering compared with normal idling may
reduce fatality rates by up to 50%. As this option does not result in any loss of
output, as best practice, it is recommended wherever it is practically
possible and there remains uncertainty over the risk posed to bats. It can be
applied at any site with a blade pitch control system which can be automated
using SCADA data. 
Research has shown that feathering and curtailment are effective methods
in reducing impacts in some bat species. 
Page 164

Page 165

These should be included in the Species Protection Plan (SPP).  
15.30 Pine Marten - Comments – The LBO is satisfied with the following proposals:
Retention of mature trees with cavities suitable for denning pine martens or
compensatory boxes where retention is not feasible. At least five boxes will be
installed. The LBO is satisfied with these proposals. Pine marten will be included
in the SPP and proposed habitat creation and restoration within the Biodiversity
Enhancement Strategy (BES) will benefit pine marten in the long term.  
15.31 Small Pearl-Bordered Fritillary Butterfly – Comments - As a Scottish
Biodiversity List (SBL) species and with suitable habitat present, the LBO ask
that this species is included within the proposed SPP and opportunities for
habitat enhancement are submitted with the Biodiversity Enhancement Plan
(BEP).  
15.32 Amphibians and Reptiles - to ensure the protection of these during the
construction phase, the LBO asks that they are included in the SPP and CEMP
and care is taken during vegetation removal. If works cannot be completed out
with the hibernation period, an Ecological Clerk of Works (ECoW) must be present
to oversee vegetation clearance. Should any reptiles or amphibians be
discovered, the ECoW should be informed immediately, and the animal should
be relocated to an appropriate area. They should also be included in the BES
where the creation of hibernacula would benefit.  
15.33 The LBO notes a Species Protection Plan (SPP), and Biodiversity
Enhancement Plan (BEP) are proposed to be submitted post-consent. Due
to the loss of habitat and biodiversity, The LBO asks that these are
submitted pre-consent to determine appropriate scale of enhancement and
mitigation measures proposed to the losses.  
15.34 Fish and Freshwater Pearl Mussel – the LBO notes that no surveys have yet
been submitted. Due to the potential sensitivities on site, the LBO requests
these surveys are submitted. This information will feed into appropriate
mitigation measures necessary. The Applicant should consult with Argyll District
Salmon Fishery Board for updated information regarding sensitive species.  
15.35 Ornithology – Golden eagle, white-tailed eagle, osprey, and hen harriers are
present within the site and will potentially be impacted upon.  
The cumulative effects of wind farms are having a negative impact on bird
species. Appropriate mitigation measures must be implemented to reduce
potential impact of bird collision. Research has shown that painting one of
the blades black can reduce fatalities. A programme of monitoring should
be implemented with results provided to NatureScot, RSPB, and Argyll
Raptor Study Group. This information will feed into further mitigation
measures which can be altered accordingly to ensure any negative impacts
to birds is minimal. 
A Bird Protection Plan (BPP) will be drafted and agreed with NatureScot.
The LBO asks that discussions with NatureScot continue. 
Page 165

Page 166

The LBO notes that NatureScot have requested further information with
regards Golden Eagle and Osprey. The LBO asks that these discussions
continue.  
15.36 Biodiversity Enhancement Plan (BEP) – the LBO notes the information within
the BES will feed into this document after consultation with ABC, NS, SEPA and
other relevant stakeholders.  
15.37 Biodiversity Enhancement Strategy (BES) 
• For peatland restoration the LBO asks the Applicant to continue consulting
with NatureScot and SEPA. The recommendations as set out within
NatureScot’s Advising on Peatland Guidance should be adhered to -
compensation restoration of a 1:10 ratio (lost restored) as well as 10%
enhancement. 
• The LBO asks that a detailed programme of tree planting be submitted to
include species which must be native and appropriate to the locality of the
area and sourced locally, location, age, timing of planting and a schedule of
monitoring and maintenance until such a time as the trees become
established. 
• Small pearl-bordered fritillary butterflies are present on site and should be
included in the BEP. 
• Amphibians and reptiles are present on site and should be included in the
BEP. The LBO notes that a BEP Steering Group is proposed to be established
to discuss, coordinate, and deliver the detailed BEP. The LBO asks that
external consultees with expertise within the necessary areas are consulted
to ensure all enhancement measures are appropriate.  
15.38 Species Protection Plan (SPP) – the LBO asks this is submitted pre-consent
to determine if the compensation, enhancement, and mitigation measures
proposed are appropriate to the scale and impact of the proposed
development. As stated in the Bats section, prevention of bat mortality should be
priority. Therefore, while a programme of monitoring of bat mortality is still
necessary to aid in further mitigation measures, the practice of feathering and
curtailment should be implemented as a matter of course.  
15.39 Bird Protection Plan (BPP) - The Applicant has stated this will be drafted and
agreed upon with NatureScot.  
15.40 It has not been possible to reach a conclusion on ornithology due to the
outstanding information requested by NatureScot in respect to a kernel analysis
for golden eagle and alternative raft locations for Osprey. Furthermore, Officers
do not agree that a suspensive condition is the best mechanism to secure the
removal of five wind turbines in the interests of mitigating barrier effects on
Greenland white-fronted geese. It is considered that this amendment to the
proposal would constitute a material change which could have implications for the
wider proposal that are unclear at this time and require to be explored e.g.
environmental impacts, infrastructure re-design, and requirement for re-
consultation. To apply such a condition could result in an unreasonable and
unimplementable consent. It is recommended that the Council object unless this
important mitigation to protect Greenland white-fronted geese is undertaken in
advance of determining this application. It is, therefore, recommended that the
proposal should be amended accordingly and be subject to a further period of
formal consultation prior to any determination by the ECU or Scottish Ministers.
Page 166

Page 167

15.41 Having due regard to the above due to outstanding information relating to
Golden eagles, Osprey and the Peat Landslide Hazard Risk Assessment and
need for amendment required by NatureScot it is not possible to reach a
conclusion on whether the proposal is consistent with the provisions of
Policies 11 – Energy, 3 Biodiversity, 5 – Soils and Policies 30 – The
Sustainable Growth of Renewables of and 79 – Protection of Soil and Peat
Resources of LDP2. If consent is granted the conditions recommended by
NatureScot, SEPA, and the Local Biodiversity Officer should be included. 
16. TREES, WOODS, AND FORESTS  
16.1 Policy 11 – Energy of NPF4 requires that project design and mitigation will
demonstrate how impacts on trees, woods and forests have been addressed.
Policy 6 – Forestry, woodland, and Trees of NPF4 intent is to protect and expand
forests, woodland, and trees. Policy 77 – Forestry, Woodland, and Trees of LDP2
states that there is a strong presumption in favour of protecting woodland
resources. Policy 78 – Woodland Removal of LDP2 states that proposals that
involve the removal of woodland resources will be assessed against the criteria
for determining the acceptability of woodland removal, in accordance with the
Scottish Government’s Control of Woodland Removal Policy. Where this
assessment concludes that compensatory planting would be appropriate,
developers will need to provide for this in accordance with the advice in the
Scottish Government’s Control of Woodland Removal Policy.  
16.2 Scottish Forestry have advised the ECU that further information should be
provided in the Forestry Plan to demonstrate full compliance with the UK Forestry
Standard. The applicant should provide an assessment, as per the “Deciding
future management options for afforested deep peatland,” to determine if the
Priority Habitat restocking exemption applies in this case. The applicant should
clarify the total area of woodland loss to ensure that the correct area of
compensatory planting is applied. Compensatory planting for the woodland lost,
other than that converted to Priority Habitat peatland, should be secured by a
condition to any consent. Furthermore, it is not clear whether forest lost to new
roads has been included in the woodland loss figure and this should also be
clarified. Finally, the appropriate consenting route required to accommodate
construction, including infrastructure and management felling, totalling 1,041.3ha
would be the S36 consent. Restocking of management felling areas and
compensatory planting relating to permanent woodland loss would also be via the
S36 consent. Any felling and restocking not required for the development should
follow the usual consenting routes under the Forestry and Land Management
(Scotland) Act 2018. 
16.3 The Applicant has provided a response to the points raised by Scottish Forestry
at time of writing there is no response from them to confirm they are satisfied with
the information provided.  
16.4 Having due regard to the above it has not been possible to reach a
conclusion on this matter due to fact that there is no response from Scottish
Forestry on the further information provided by the Applicant. It is therefore
not possible to assess whether the proposal is consistent with the
provisions of Policies 11 – Energy and 6 – Forestry, woodland, and Trees of
NPF4, and Policies 30 – The Sustainable Growth of Renewables; 77 –
Forestry, Woodland, and Trees and 78 – Woodland Removal of the LDP2
Page 167

Page 168

17. MINERALS  
17.1 Policy 33 – Minerals of NPF4 states that proposals for borrow pits will only be
supported where the proposal is tied to a specific project and is time-limited, the
proposal complies with the mineral extraction criteria in Policy 33 taking into
account the temporary nature of the development, and appropriate restoration
proposals are enforceable and Policy 31 – Minerals of LDP2 states that proposals
for mineral extraction will generally be supported for borrow pits where the
proposal is found to be acceptable after being assessed against NPF4 Policy 33
criterion e).  
17.2 In order to minimise the volume of material imported to the site and any
associated environmental impacts associated with increased traffic, it is
anticipated that some stone will be sourced from an onsite borrow pit. It will likely
be necessary to import some stone to the site. Aggregate will be required for the
construction of access tracks (18.2 km of new track and 9.8 km of upgraded
track), crane pads, and compounds. Some material is expected to be gained from
new cut and fill construction, but this is not expected to generate sufficient
aggregate for all on-site requirements. There is therefore a need for additional
excavation of aggregate material. An existing borrow pit/quarry is present within
the site and is used to provide aggregate for ongoing forestry activities, however
this existing source is required for use by FLS. 
17.3 Having due regard to the above taking into account that the proposed
borrow pits are tied to the proposal and subject to a condition to secure
details of the borrow pits and a borrow pit restoration plan being attached
to any consent it is concluded that the proposal is consistent with the
provisions of Policy 33 – Minerals of NPF4 and Policy 31 – Minerals of LDP2
in this regard, subject to a condition to secure details of the borrow pit and
a borrow pit restoration plan.  
18. DECOMMISSIONING, SITE RESTORATION AND QUALITY OF SITE
RESTORATION PLANS    
18.1 Policy 11 – Energy of NPF4 requires that project design and mitigation
demonstrate how the decommissioning of developments, including ancillary
infrastructure, and site restoration have been addressed. It also requires that
project design and mitigation demonstrate how the quality of site restoration plans
have been addressed including the measures in place to safeguard or guarantee
availability of finances to effectively implement those plans. Policy 30 – The
Sustainable Growth of Renewables of the LDP2 requires consideration to be
given to the long-term environmental management of the site. 
18.2 The proposal is expected to operate for up to 40 years following which
decommissioning of the wind turbines and other infrastructure and site restoration
would be undertaken as required. Any alternative to this action would be subject
to a further consenting process.  
18.3 It is recommended that this matter is covered by planning conditions consistent
with other projects across Argyll & Bute if the proposal obtains consent from the
ECU. 
Page 168

Page 169

18.4 Having due regard to the above it is concluded that subject to an
appropriate condition being attached if the proposal receives consent the
proposal is consistent with the provisions of Policy 11 – Energy of NPF4
and Policy 30 - The Sustainable Growth of Renewables of the LDP2  
19. CUMULATIVE IMPACTS  
19.1 Policy 11 – Energy of NPF4 requires that project design and mitigation will
demonstrate how cumulative impacts have been addressed. Policy 30 – The
Sustainable Growth of Renewables of the LDP2 also requires cumulative impacts
to be addressed. Any cumulative impacts which have been identified are covered
in the preceding sections of this report.  
20. RENEWABLE ENERGY GENERATION TARGETS AND GREENHOUSE GAS
EMISSIONS REDUCTION TARGETS. 
20.1 Policy 11 – Energy of NPF4 requires that, in considering the impacts of the
proposal, significant weight will be placed on the contribution of the proposal to
renewable energy generation targets and on greenhouse gas emissions reduction
targets. Policy 1 – Tackling the climate and nature crises of NPF4 requires that
when considering proposals significant weight will be given to the global climate
and nature crises. Policy 30 – The Sustainable Growth of Renewables of LDP2
requires all renewable developments to be assessed against the scale of
contribution to renewable energy generation targets and greenhouse gas
emissions. 
20.2 Renewable Electricity Generation - Both UK and Scottish Government energy
policy recognises the need for substantial increases in renewable energy
generation if the transition towards net zero is to be achieved. The proposed
turbines will have a combined rated output of around 191.4 MW. A battery energy
storage system will also be installed with a capacity of up to 108.6 MW giving a
total capacity for the proposal of around 300 MW. The prospective electricity
generation from the proposed wind turbines equates to the annual power
consumed by up to approximately 235,000 average Scottish households.  
20.3 Greenhouse Gas Emissions – The proposal would reduce greenhouse gas
emissions through replacing fossil fuel generation. The length of time a wind
turbine needs to be in operation before it has, by displacing fossil fuel energy
generation, avoided as much carbon dioxide as was released in its lifecycle is
known as the carbon payback period. A carbon balance assessment has been
undertaken using the Scottish Government’s carbon calculator. The results show
that the wind farm component of the proposal is estimated to produce annual
carbon savings of over 300,000 tonnes of CO2e per year, through the
displacement of grid electricity, based on the current fossil fuel grid mix. The
estimated payback time, using the Scottish Government Carbon 
Calculator is 1.1 years, with a minimum/maximum range of 0.7 to 1.9 years, based
on the fossil fuel mix of the electricity grid. The proposal is evaluated to have an
overall beneficial effect on the carbon emissions associated with energy
production.  
20.4 Having due regard to the above it is considered that the proposal is
consistent with the provisions of Policies 1 – Tackling the climate and
nature crisis and 11 – Energy of NPF 4, and Policies 30 – The Sustainable
Page 169

Page 170

Growth of Renewables and 04 – Sustainable Development of LDP2 in
respect to renewable energy generation targets and greenhouse gas
emissions reduction targets.    
21. GRID CAPACITY & ENERGY STORAGE    
21.1 Policy 11 – Energy of NPF4 requires that grid capacity should not constrain
renewable energy development. It is for developers to agree connections to the
grid with the relevant network operator. Furthermore, that proposals for all forms
of renewable, low-carbon and zero emissions technologies will be supported,
which include energy storage. Policy 30 – The Sustainable Growth of Renewables
of LDP2 requires the Council to have regard to the opportunities for energy
storage. 
21.2 Grid Capacity - Connection to Electricity Grid - The electrical power produced by
the individual wind turbines (as well as that stored in the BESS) will be transmitted
to the proposed Substation via underground cables. A connection to the national
grid’s electricity system will be required. The Applicant holds a grid connection
offer of 2029. The grid connection does not form part of the Proposed
Development and is not the subject of the Application. A separate Section 37
application under the 1989 Act will be made to the Scottish Ministers by Scottish
and Southern Energy Networks (SSEN).  
21.3 Energy storage – It is proposed that a Battery Energy Storage System (BESS)
with a capacity of up to approximately 108.6 MW in total will be constructed within
the substation compound to enable co-location of BESS with the proposed wind
turbines. It is anticipated that the preferred choice will be Li-ion batteries,
contained within secure steel shipping-like containers. When needed, the energy
stored in the batteries will be transferred to 33 kV transformers within the BESS
compound then onto the 33 kV substation via underground electrical cable from
the BESS substation.  
21.4 The BESS will consist of batteries, inverters, heating, ventilation, and air
conditioning (HVAC) units, fire protection and auxiliary components all contained
and bunded within secure steel shipping-like containers. The exact technology
will be confirmed at the time of procurement.  
21.5 Up to 54 units are anticipated with an approximate output capacity of 2 MW each.
Each BESS unit will be approximately 9.1 m x 1.6 m, with a height of up to 2.5 m.
Should the rating of each BESS unit increase due to improvements in technology
at the time of deployment (e.g. each unit has an approximate output capacity of
more than 2 MW each) then fewer BESS containers would be required.  
21.6 Fire Safety issues have been raised regarding the BESS. The Applicant has
confirmed that the inclusion of a Battery as part of the development was
considered within each EIA chapter, with no significant effects concluded. They
have advised that they will agree a Fire Safety Plan, as part of the condition
discharging process in consultation with the HSE and local fire brigade to ensure
there’s local capability to manage any potential fire.  
21.7 The Health and Safety Executive were consulted by the ECU and have advised
they have no comment.  
Page 170

Page 171

21.8 Having due regard to the above it is considered that the proposal is
consistent with the provisions of Policy 11 – Energy of NPF 4, and Policy 30
– The Sustainable Growth of Renewables of the ABLDP2 in respect to Grid
Capacity and Energy Storage.  
22. PERPETUITY    
22.1 Policy 11 – Energy of NPF4 requires that consents for proposals may be time
limited. Areas identified for wind farms are, however, expected to be suitable for
use in perpetuity. It is acknowledged that areas identified for wind farms are
expected to be suitable for use in perpetuity. However, as the expected
operational life of the proposal is 40 years from the date of commissioning, should
consent be granted, Officers would expect it to be time limited to 40 years to
reflect the life of the wind farm as detailed in the EIAR.  
23. CONCLUSION   
23.1 This proposal is classed as “Strategic Renewable Electricity Generation” - a
National Development, in terms of the Spatial Strategy given its capacity to
generate and store more than 50MW. In principle, there is support for this scale
of development given its importance in the delivery of Scotland’s Spatial Strategy.
However, such projects are still required to be assessed against the provisions of
the Development Plan, which consists of NPF4 and LDP 2.  
23.2 The lead Development Plan policies support renewable energy development in
principle but require proposals to be assessed against the criterion detailed in this
report. While the weight to be given to each of the considerations is a matter for
the decision maker, NPF4 is clear that significant weight will require to be placed
on the contribution of the proposal to renewable energy generation targets and
on greenhouse gas emission reduction targets. However, a balance still requires
to be reached in terms of the impact of the development. 
23.3 In relation to landscape and visual impacts NPF4 advises that where impacts are
localised and/or appropriate design mitigation has been applied such effects will
be considered acceptable. However, NPF4 must be read as a whole, and detailed
consideration given to linked policies. Policy 4 (Natural Places) – sets out that
proposals which by virtue of type, location or scale will have an unacceptable
impact on the natural environment will not be supported. Whilst it is considered
that this proposal will have a significant landscape and visual impact, it is not
considered that it warrants an objection 
23.4 The Scottish Government gives considerable commitment to renewable energy
and encourages Planning Authorities to support the development of wind farms
where they can operate successfully in appropriate locations. This is not however
blanket support without qualification. In considering the appropriateness of the
development, significant weight has been given to these matters. 
24. RECOMMENDATION  
24.1 That the ECU be notified accordingly that: 
(1) Ornithology - Argyll & Bute Council has been unable to reach a conclusion
on ornithology due to the outstanding information requested by NatureScot in
Page 171

Page 172

respect to a kernel analysis for golden eagle and alternative raft locations for
Osprey. 
Furthermore, the Council does not agree that a suspensive condition is the best
mechanism to secure the removal of five wind turbines in the interests of
mitigating barrier effects on Greenland white-fronted geese. It is considered that
this amendment to the proposal would constitute a material change which could
have implications for the wider proposal that are unclear at this time and require
to be explored e.g. environmental impacts, infrastructure re-design, and
requirement for re-consultation. To apply such a condition could result in an
unreasonable and unimplementable consent. 
Argyll & Bute Council OBJECT unless this important mitigation to protect
Greenland white-fronted geese is undertaken in advance of determining this
application. It is, therefore, recommended that the proposal should be amended
accordingly and be subject to a further period of formal consultation prior to any
determination by the ECU or Scottish Ministers. 
(2) Peat Landslide Hazard Risk Assessment - Argyll & Bute Council has been
unable to reach a conclusion in respect to the Peat Landslide Hazard Risk
Assessment (NPF4 Policies 5 and 11 and LDP2 30 and 79) as no response has
been provided by Ironside Farrar on the further information provided by the
Applicant. Argyll & Bute Council OBJECT unless this issue is resolved to the
satisfaction of Ironside Farrar prior to determination of this application by the ECU.
Should this issue not be resolved the Council would defer to Ironside Farrar (or
any other body appointed by the ECU to provide expert guidance on this matter)
in the event of a PLI.
(3) Scottish Forestry – Argyll & Bute Council has been unable to reach a
conclusion within the time afforded in respect to Forestry as no updated
response has been provided by Scottish Forestry to clarify they are satisfied with
the Applicant’s response. Argyll & Bute Council are therefore not in a position to
confirm whether the proposal is consistent with the relevant provisions of NPF4
Policies 6 and 11 and LDP2 Policies 77 and 78 and would recommend that the
ECU consider these matters prior to determination.
(4) Archaeological Impact - Argyll & Bute Council has no objection in respect
to Archaeological Impact, subject to a condition and advisory note to secure
the recommendations of the West of Scotland Archaeology Service being
attached to any grant of consent for a Written Scheme of Investigation (WSI) for
archaeological mitigation measures and an advisory note that the Applicant
ensures they have all necessary legal permissions for any elements of their
archaeological mitigation. Specifically, in regard to the RAF Hudson aircraft crash
site mitigation proposals which may require a license from the MoD if it is to be
disturbed. 
(5) Public Access - Argyll & Bute Council has no objection in respect to Public
Access subject to advisory notes being attached to any consent to ensure that
any Access Controls i.e. gates, and cattle grids comply with the British Horse
Society Guidance. Furthermore, that public access during construction should
comply with NatureScot guidance ‘Good practice during wind farm
construction.’ 
(6) Landscape & Visual Impact - Argyll & Bute Council has no objection in
respect to landscape and visual impact subject to a condition to secure further
Page 172

Page 173

aviation lighting mitigation in the form of an Aircraft Detection Lighting System being
attached to any consent. 
(7) Biodiversity Impact - Argyll & Bute Council has no objection in respect to
Biodiversity Impact, subject to conditions to secure the recommendations of the
Local Biodiversity Officer being attached to any consent.
(8) Noise Impact - Argyll & Bute Council has no objection in respect to noise
impact, subject to suitably worded conditions to limit the noise levels, tonality, and
amplitude modulation to control noise levels from the proposal and provide
appropriate noise mitigation as recommended and agreed by the Council’s Noise
Consultant being attached to any consent.
(9) Flood Risk - Argyll & Bute has no objection in respect to flood risk subject to
conditions to secure the recommendations of the Flood Risk Assessor being
attached to any consent:
• To ensure watercourse crossings are designed to convey the 1 in 200 year
plus climate change flood event. 
• Surface water drainage is designed in accordance with CIRIA C753 and
ensures that post development surface water runoff does not exceed the
pre-development surface water runoff. The surface water drainage should
be in operation prior to the start of construction.
(10) Argyll & Bute Council requests that all conditions recommended by
other consultees are included in any Consent with exception to the
condition requiring removal of 5 turbines referred to at (1) above. 
Page 173

Page 174

This page is intentionally left blank

Page 175

© Crown Copyright and database right 2024
All rights reserved. OS license (customer) account number AC0000849384
Location Plan Relative to: 25/00600/S36
O
1:35,000
0 325 650162.5 Meters
Application Site
Page 175

Page 176

This page is intentionally left blank