Democracy Spraffa

Printed minutes

Argyll and Bute Council · 21 January 2026
Back to Planning, Protective Services and Licensing Committee — 21 January 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING
COMMITTEE held BY MICROSOFT TEAMS on WEDNESDAY, 21 JANUARY 2026 
Present: Councillor Gordon Blair (Chair) 
Councillor John Armour
Councillor Jan Brown
Councillor Kieron Green
Councillor Amanda Hampsey
Councillor Graham Hardie 
Councillor Fiona Howard
Councillor Andrew Kain
Councillor Liz McCabe
Councillor Peter Wallace 
Attending: Shona Barton, Governance Manager
Sandra Davies, Major Applications Team Leader
Stuart Ramsay, Area Team Leader – Mid Argyll, Kintyre & the Islands
Kirsty Sweeney, Area Team Leader – Bute, Cowal, Helensburgh & Lomond
Arlene Knox, Senior Planning Officer
Shelley Gould, Senior Planning Officer
Steven Gove, Planning Officer
Donna Lawson, Traffic and Development Officer
Keith Tennant, Parking Supervisor
Louise Russell, Landscape Architect 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Audrey Forrest, Daniel Hampsey,
Mark Irvine, Paul Kennedy and Dougie Philand. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. MINUTES 
a) The Minute of the Planning, Protective Services and Licensing Committee held on 12
December 2025 was approved as a correct record. 
b) The Minute of the Planning, Protective Services and Licensing Committee held on 17
December 2025 at 10.30 am was approved as a correct record. 
c) The Minute of the Planning, Protective Services and Licensing Committee held on 17
December 2025 at 2.30 pm was approved as a correct record. 
d) The Minute of the Planning, Protective Services and Licensing Committee held on 17
December 2025 at 3.30 pm was approved as a correct record.

Page 2

4. VOLTALIA UK LTD (SCOTTISH GOVERNMENT CONSULTATION):
SECTION 36 CONSULTATION TO CONSTRUCT AND OPERATE 6 WIND
TURBINES WITH A GROUND TO BLADE TIP HEIGHT OF 200 METRES,
AND ASSOCIATED INFRASTRUCTURE INCLUDING BATTERY ENERGY
STORAGE SYSTEM AND COMPOUND (BESS) - CRUACH CLENAMACRIE
WIND FARM: LAND AT GLENLONAN APPROXIMATELY 7KM EAST OF
OBAN AND 5KM WEST OF TAYNUILT (REF: 24/02242/S36) 
The Area Team Leader spoke to the terms of the report which provided a recommended
response to the Scottish Government’s Energy Consents Unit (ECU) Section 36
Consultation for Cruach Clenamacrie Wind Farm, to construct and operate 6 wind
turbines, and associated infrastructure including Battery Energy Storage System
compound (BESS) at land at Glenlonan, approximately 7 km east of Oban and 5 km west
of Taynuilt. 
This report reviews the policy considerations which are applicable to this proposal and the
planning merits of the development, the views of bodies consulted by the Scottish
Government along with other consultations undertaken by the Council, and third party
opinion expressed to the Scottish Government. 
Reference was also made to supplementary report number 1 which clarified a number of
procedural points raised by the Applicant. 
Decision 
The Committee agreed that the ECU be notified accordingly that: 
1. Argyll and Bute Council object to the proposal on landscape and visual grounds, as the
proposed wind farm would result in significant adverse landscape and visual effects,
contrary to NPF4 Policy 11 and LDP2 Policy 30. 
2. Peat Landslide Hazard Risk Assessment - Argyll and Bute Council has been unable to
reach a conclusion in respect to the Peat Landslide Hazard Risk Assessment (NPF4
Policies 5 and 11 and LDP2 30 and 79) as no response has been provided by Ironside
Farrar on the further information provided by the Applicant. Argyll and Bute Council
OBJECT unless this issue is resolved to the satisfaction of Ironside Farrar prior to the
determination of this application by the ECU. Should this issue not be resolved the
Council would defer to Ironside Farrar (or any other body appointed by the ECU to
provide expert guidance on this matter) in the event of a PLI. 
3. Archaeological Impact - Argyll and Bute Council has been unable to reach a
conclusion within the time afforded in respect to Archaeological Impact as no response
has been received from the West of Scotland Archaeology Service. Argyll and Bute
Council are therefore not in a position to confirm whether the proposal is consistent
with the relevant provisions of NPF4 Policy 7 and LDP2 Policy 21 and would
recommend that the ECU consider these matters prior to determination. 
4. Argyll and Bute do not object on noise impact grounds, subject to the inclusion of an
Operational Noise Planning Condition, as recommended by the Council’s Noise
Consultant, Mott MacDonald, specified in their Review of Evidence – Noise, dated
March 2025.

Page 3

5. Argyll and Bute Council do not object on Public Access grounds, subject to the
inclusion of a condition requiring the developer to prepare an Access Plan for approval
by the Council prior to the commencement of construction. 
6. Argyll and Bute Council do not object on Roads grounds, subject to the inclusion of
relevant conditions, as specified by Transport Scotland in their consultation response
to the ECU dated 04/02/25. 
7. Argyll and Bute Council requests that the recommendations of the Council’s Local
Biodiversity Officer are considered by the ECU, including: 
Recommend that the applicant continue discussions with NatureScot and SEPA to
ensure best practice for peat extraction and restoration. 
While the impact to bats is unlikely to be significant, it would be advisable to monitor
any fatalities that may occur from collision as they are found to forage within the wind
turbine areas. This information will feed into mitigation measures which can be altered
accordingly, to ensure any negative impacts to foraging / commuting bats is minimal. 
Recommend that due to the presence of black grouse in the area, the applicant should
ensure the fences are clearly marked and that a programme of monitoring fences for
any potential black grouse carcasses is implemented 
Recommend that the applicant continues discussions with relevant organisations, to
ensure that appropriate mitigation and enhancement measures are adhered to and
potential impacts are minimal. 
8. Ornithology: Whilst NatureScot has not objected to this issue, it is noted that they
consider the proposed development may result in significant impacts on Schedule 1
bird species and a regionally important black grouse population. It is recommended
that the ECU gives further consideration to this issue before determining the
application. 
9. Argyll and Bute Council requests that all other conditions recommended by consultees
are included in any Consent. 
(Reference: Report by Head of Development and Economic Growth dated 6 January 2026
and supplementary report number 1 dated 20 January 2026, submitted) 
5. MR AND MRS SCOTT RAEBURN: ERECTION OF TEAROOM WITH 4
APARTMENTS ON UPPER FLOORS: FORMER SUSY'S TEAROOM,
TIGHNABRUAICH (REF: 25/00181/PP) 
The Planning Officer spoke to the terms of the report.  The application is for a building that
would accommodate a new café/restaurant on the ground floor and the introduction of 4
self-catering flatted apartments on the upper floors.  The application site is considered to
be brownfield land and is located within the Key Rural Settlement of Tighnabruaich.  The
Susy’s Tearoom building was removed in 2020/2021 and the land on which is stood has
bene vacant since then. 
Objections to the application have been received from a total of five sources, and in terms
of the Scheme of Administration and Delegation contained in the Council’s Constitution

Page 4

(2025), this number is less than the eleven that is required in order for the PPSL
Committee to consider proposal. 
This application is before Members as the Roads Department are recommending refusal
as they do not consider the parking spaces in the large neighbouring car park to represent
a suitable provision and are of the view that the number of proposed on-site spaces is
insufficient to meet the increase in parking demand resulting from the proposed
development. 
It is the opinion of the Planning Department that the use of the public car park by patrons
and members of staff of the proposed café/restaurant can be accepted as this was the
situation that existed for decades in association with the previous Susy’s Tearoom. 
Having regard to the parking standards in LDP2 Policy 40, the number of spaces to be
provided in relation to the four two-bedroomed units would be eight.  As five on-site
spaces are proposed, this represents a shortfall of three spaces.  In this case it is
considered that this shortfall can be accepted as a minor departure to policy and the
details of the mitigating factors were set out in Section (S) of the report of handling. 
It was recommended that planning permission be granted as a minor departure to
Development Plan Policy subject to the conditions, reasons and advisory notes appended
to the report of handling. 
Decision 
The Committee agreed to grant planning permission as a minor departure to Development
Plan Policy, subject to the following conditions and reasons and the advisory notes
appended to the report of handling: 
Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. Approved Details 
Unless otherwise directed by any of the conditions below, the development shall be
implemented in accordance with the details specified in the application form dated 4th
February 2025; the supporting information; and the approved drawings listed in the
table below unless the prior written approval of the planning authority is obtained for an
amendment to the approved details under Section 64 of the Town and Country
Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
General
Arrangement –
Site Location
Plan 
Drawing No. HG
A3 L(9-)P901
- 05/02/2025
General
Arrangement –
Site Location
Drawing No. HG
A3 L(9-)P901A
- 07/02/2025

Page 5

Plan 
General
Arrangements –
Site Layout 
Drawing No. HG
GA L (--) P002C
C 12/06/2025
General
Arrangements –
Ground & 1st
Floor Plans 
Drawing No. GN
GA L (--) P003B
B 12/06/2025
General
Arrangements –
Ground Floor
Plan 
Drawing No. HG
GA L (--) P004B
B 12/06/2025
General
Arrangements –
First and
Mezzanine Floor
Plans 
Drawing No. HG
GA L (--) P005B
B 12/06/2025
General
Arrangements –
Sections 
Drawing No. GN
GA L (--) P006B
B 12/06/2025
General
Arrangements –
Proposed
Elevations 
Drawing No. HG
GA L (--) P008B
B 12/06/2025
General
Arrangements –
Proposed
Elevations 
Drawing No. GN
GA L (--) P009C
C 12/06/2025 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. Contaminated Land Assessment 
Unless otherwise agreed in writing and in advance by the Planning Authority, prior to
any development commencing on the site, a scheme will be submitted by the
Developer (at their expense) to identify and assess potential contamination on the
site.  No work on the site shall commence until the scheme has been submitted to, and
approved, by the Planning Authority, and is thereafter implemented in accordance with
the scheme so approved.   
The scheme shall be undertaken by a competent person or persons in accordance
with relevant authoritative guidance including Planning Advice Note (PAN) 33 (2000)
and BS10175:2011 or, in the event of these being superseded or supplemented, the

Page 6

most up-to-date version(s) of any subsequent revision(s) of, and/or supplement(s) to,
these documents. This scheme should contain details of proposals to investigate and
remediate potential contamination to the satisfaction of the Planning Authority, and
must include: 
a) A desk study and development of a conceptual site model/preliminary risk
assessment, including a ground investigation strategy for any phases of ground
investigation proposed to be undertaken (exploratory, main or supplementary). The
desk study and the scope and method of recommended investigations shall be
agreed with the Council prior to addressing parts b, c, and d of this condition. 
Should the desk study show the need for further assessment, this will be undertaken in
the following sequence: 
a) A detailed investigation of the nature and extent of contamination on site, and
assessment of the risks such contamination presents. 
b) Development and agreement of a remedial strategy (if required) to treat/ remove
contamination ensuring the site is made suitable for its proposed use (this shall
include a method statement, programme of works and proposed verification plan). 
c) Submission of a verification report for any agreed remedial actions detailing and
evidencing the completion of these works. 
Written confirmation from the Planning Authority that the scheme has been
implemented and completed shall be required by the Developer before any
development hereby approved commences. Where remedial measures are required as
part of the development construction detail, commencement must be agreed in writing
with the Planning Authority. 
Reason: In order to ensure that the potential risks to human health, the water
environment, property, and ecological systems arising from any identified land
contamination have been adequately addressed. 
3. Short Term Holiday Accommodation 
The residential accommodation units hereby approved shall be used for short-term
holiday occupancy only and not as a main residence and shall not be occupied by any
family, group or individual for a cumulative period of more than three calendar months
in any one year. A register showing dates of arrivals and departures shall be
maintained by the Site Operator and shall be available at all reasonable times for
inspection by the Planning Authority. 
Reason: In order to define the permitted occupancy to satisfy the provisions of the
Development Plan. 
4. Noise Assessment and Management Plan for Construction Operations 
Prior to the commencement of the development, a Noise Management Plan relative to
the construction phase shall be submitted to and approved in writing by the Planning
Authority. 
The document shall incorporate the following:

Page 7

i. An identification and assessment of all potential sources of nuisance that may
cause disturbance to nearby residents during the construction of the
development, including noise/ vibration, dust, surface runoff and any temporary
lighting. This should cover all aspects of the proposal (e.g. ground works,
access improvements and construction of building and any associated facilities). 
ii. For all potential sources of nuisance, the applicant will be required to provide a
management plan that incorporates details of the suitable control measures to
be put in place so as to ensure that construction works do not cause a loss of
amenity to local residents and/or statutory nuisance. Such details shall include
(but not be limited to) the intended hours of working; the movement of vehicles
into, within and out of the site; the use of plant; and the storage of equipment
and materials on the site. 
Unless otherwise agreed in writing with the Planning Authority, the construction of the
development shall be carried out in accordance with the approved Noise Management
Plan.     
Reason: In order to avoid sources of nuisance in the interest of amenity. 
5. Hours of Construction Working 
The hours of working at the site during the construction of the development hereby
approved shall be restricted to 08.00 to 18:30 Monday to Friday and 08.00 to 13.00 on
Saturdays. No construction work shall take place at the site on Sundays or Bank
Holidays. 
Reason: In order to avoid sources of nuisance in the interest of amenity. 
6. Noise Assessment and Management Plan for Operational Activities 
Prior to the development coming into use, a Noise Management Plan relative to
the operational phase shall be submitted to and approved in writing by the Planning
Authority. 
The document shall incorporate the following: 
i. A noise assessment undertaken in terms of BS4142:2014+A1:2019 ‘Methods
for rating and assessing industrial and commercial sound’, the scope of which
shall include the extraction unit for the commercial premises.    
ii. Details of the means by which extraneous noise will be mitigated to ‘Best
Practicable Means’. The Noise Rating Criteria to be achieved during the day
(0700-1900hrs) will be NR35 and will be NR25 during the evening/night (1900-
0700hrs).  
iii. Details of the opening hours of the café/restaurant and the timing of deliveries
and collections to and from the site. 
Unless otherwise agreed in writing with the Planning Authority, the development shall
be operated in accordance with the approved Noise Management Plan.

Page 8

Reason: In order to ensure that acceptable noise and vibration levels are not
exceeded. 
7. Odour Assessment and Mitigation Measures 
Prior to the commencement of the development, a detailed specification regarding the
collection, treatment and disposal of cooking odours shall be submitted to and
approved in writing by the Planning Authority.   
The specification shall incorporate the following: 
i. Precise details of the location of equipment used for the cooking and heating of
food. 
ii. Information (including manufacturer’s details) on canopies, grease filters, rates
of air movement over the canopy, make–up air, air disposal points, etc. The air
disposal points should terminate at least 1 metre above any opening windows. 
Unless otherwise agreed in writing with the Planning Authority, the system for the
collection, treatment and disposal of cooking odours shall be implemented in full
accordance with the approved details prior to the premises being brought into use for
the preparation and sale of food and it shall, thereafter, be operated and maintained in
a manner that is consistent with the agreed specification.     
Reason: In order to protect the amenity of the immediate area and prevent the creation
of odour nuisance. 
8. Arrangements for the Storage and Collection of Waste 
Prior to the commencement of the development, details of the proposed arrangements
for the storage and collection of waste shall be submitted to and approved in writing by
the Planning Authority. The arrangements shall be implemented in accordance with the
approved requirements prior to the development being brought into use and shall
thereafter be retained in perpetuity unless otherwise agreed in writing by the Planning
Authority. 
Reason: In order to accord with the principles of sustainable waste management within
NPF4 Policy 12 and LDP2 Policy 63. 
9. External Lighting 
Unless otherwise agreed in writing with the Planning Authority, all external lighting on
the application site shall be operated, positioned and angled in compliance with the
Scottish Government Guidance Note “Controlling Light Pollution and Reducing Lighting
Energy Consumption” (March 2007). 
Reason: In order to protect the amenity of the immediate area from the creation of
nuisance due to light pollution and to support the reduction of energy consumption. 
10. Details of Access and Parking 
Prior to the commencement of the development, the following details shall be
submitted to and approved in writing by the Planning Authority:

Page 9

i. The location, design and materials of any proposed walls, fences and gates. 
ii. The means by which direct access between any of the proposed parking spaces
and the adjoining public car park is to be prevented. 
iii. The materials to be used in the surfacing of the car parking spaces and turning
court. 
iv. The layout of the access point into the turning court from the public car park. 
Prior to the development being brought into use, the parking spaces and the access
into the turning court shall be formed in full accordance with the details approved under
points (ii), (iii) and (iv) above. Thereafter, the parking spaces and turning court shall be
maintained clear of obstruction for the parking and manoeuvring of vehicles. 
Reason: In the interests of road safety and in order to ensure that there is a level of
parking provision that is commensurate with the scale of the development. 
11. Biodiversity Enhancement 
Prior to the commencement of the development hereby approved, a biodiversity
statement shall be submitted to and approved in writing by the Planning Authority. The
statement shall demonstrate how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits will be
implemented and maintained for the lifetime of the development. 
All physical biodiversity enhancement measures (e.g. bird nesting boxes, ‘swift bricks’,
wildlife ponds, bat and insect boxes, hedgehog homes, etc) shall be implemented in
full before the development hereby approved is first brought into use. 
All biodiversity enhancement measures consisting of new or enhanced planting shall
be undertaken either in accordance with the approved scheme of implementation or
within the next available planting season following the development first being brought
into use. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot and Scottish Government Planning Guidance: Biodiversity as appropriate. 
Reason: In order to comply with the requirements of NPF4 Policy 3. 
12. Surface Water Drainage 
Prior to the commencement of the development hereby approved, details of a
sustainable urban drainage system compliant with the guidance set out in CIRIA’s
SuDS Manual C753 shall be submitted to and approved in writing by the Planning
Authority. The approved surface water drainage system shall be operational prior to
the development being brought into use and shall be maintained as such thereafter. 
Reason: In order to ensure that adequate surface water drainage is implemented to
prevent flooding elsewhere. 
13. Electricity Substation

Page 10

Prior to the commencement of the development, a report shall be submitted to and
approved in writing by the Planning Authority in consultation with the Environmental
Health Service and Scottish and Southern Electricity. This report shall incorporate the
following: 
i. An assessment of the noise levels generated by the operation of the existing
electricity sub-station, together with an assessment of whether the noise is likely
to give rise to complaints. This assessment should be carried out using the
methodology detailed in BS4142:2014+A1:2019 ‘Methods for rating and
assessing industrial and commercial sound’. In accordance with Planning
Advice Note 1/2011, as part of the assessment, consideration must be given to
any likely increase in noise levels that may reasonably be expected in the
foreseeable future from the operation of the electricity sub-station. 
ii. Using the findings of the above assessment, the developer must then identify
the measures needed to mitigate any potential adverse effects of noise for the
patrons of the café/restaurant and the occupiers of the short-term holiday letting
units. Examples of suitable mitigation measures are detailed in Planning Advice
Note 1/2011. 
Unless otherwise agreed in writing with the Planning Authority, the building shall be
constructed having regard to the mitigation measures included within the approved
report. 
Reason: In the interests of the privacy and amenity of the proposed building having
regard to the provisions of Policy 14 of the Argyll and Bute Local Development Plan 2
(2024). 
14. Bicycle Storage 
A facility for the storage of cycles, the details of which shall have been previously
submitted to and agreed in writing with the Planning Authority, shall be provided within
the application site prior to the development hereby approved being brought into use.
Unless otherwise agreed in writing with the Planning Authority, the approved cycle
storage shall be retained in perpetuity for this dedicated purpose. 
Reason: In the interests of facilitating the use of cycles by the patrons of the building
hereby approved in accordance with the provisions of National Planning Framework 4
Policy 13 ‘Sustainable Transport’. 
(Report by Head of Development and Economic Growth dated 6 January 2026, submitted)

Page 11

6. CNOC BUIDHE WIND ENERGY HUB LIMITED: SECTION 36
CONSULTATION: CNOC BUIDHE WIND FARM ENERGY HUB,
COMPRISING A WIND FARM OF UP TO 29 WIND TURBINES, WITH 14 OF
THESE UP TO 180M TO BLADE TIP AND 15 UP TO 200M TO BLADE TIP,
WITH ANCILLARY ENERGY STORAGE AND ASSOCIATED
INFRASTRUCTURE: APPROXIMATELY 2.5 KM EAST OF
BELLOCHANTUY AND 10 KM NORTHWEST OF CAMPBELTOWN (REF:
25/00600/S36) 
The Senior Planning Officer spoke to the terms of the report which provided a
recommended response to the Scottish Government’s Energy Consents Unit (ECU)
Section 36 Consultation for Cnoc Buidhe Wind Energy Hub approximately 2.5 km East of
Bellochantuy and 10 km Northwest of Campbeltown. 
This report reviews the policy considerations which are applicable to this proposal and the
planning merits of the development, the views of bodies consulted by the Scottish
Government along with other consultations undertaken by the Council, and third party
opinion expressed to the Scottish Government. 
Reference was also made to supplementary report number 1 which provided Members
with an update on correspondence received from the Applicant in respect to Ornithology
and also advised Members of new consultee responses received from Scottish Forestry
and Ironside Farrar. 
The Committee was asked to agree the recommended response to the ECU set out in
supplementary report number 1. 
Decision 
The Committee agreed that the ECU be notified accordingly that: 
1. Ornithology - Argyll and Bute Council has been unable to reach a conclusion on
ornithology due to the outstanding information requested by NatureScot in respect to a
kernel analysis for golden eagle and alternative raft locations for Osprey. 
Furthermore, the Council does not agree that a suspensive condition is the best
mechanism to secure the removal of five wind turbines in the interests of mitigating
barrier effects on Greenland white-fronted geese. It is considered that this amendment
to the proposal would constitute a material change which could have implications for
the wider proposal that are unclear at this time and require to be explored e.g.
environmental impacts, infrastructure re-design, and requirement for re-
consultation. To apply such a condition could result in an unreasonable and
unimplementable consent. 
Argyll and Bute Council OBJECT unless the outstanding information is submitted to
the satisfaction of NatureScot and the important mitigation to protect Greenland white-
fronted geese is undertaken in advance of determining this application.  It is, therefore
recommended that the proposal should be amended accordingly and be subject to a
further period of formal consultation prior to any determination by the ECU or Scottish
Ministers. 
NOTE:  With regard to the mitigation, should NatureScot remove or update their
objection with mitigation that is considered appropriate as part of the consideration of

Page 12

the current proposal, or which could be secured via planning conditions to be agreed
with the Planning Authority, then Argyll and Bute Council would no longer object on
these grounds. 
2. Peat Landslide Hazard Risk Assessment - Argyll & Bute Council has been unable to
reach a conclusion in respect to the Peat Landslide Hazard Risk Assessment (NPF4
Policies 5 and 11 and LDP2 30 and 79). In their Stage 2 Checking Report, Ironside
Farrar have advised they have two further queries on assessment of risks to
infrastructure that require a response from the developer. It is understood that a
response was provided to Ironside Farrar on the 19th of January 2026. Argyll and Bute
Council OBJECT unless this issue is resolved to the satisfaction of Ironside
Farrar prior to determination of this application by the ECU. Should this issue not be
resolved the Council would defer to Ironside Farrar (or any other body appointed by
the ECU to provide expert guidance on this matter) in the event of a PLI as no
response has been provided by Ironside Farrar on the further information provided by
the Applicant. 
3. Archaeological Impact - Argyll and Bute Council has no objection in respect to
Archaeological Impact, subject to a condition and informative to secure the
recommendations of the West of Scotland Archaeology Service being attached to any
grant of consent for a Written Scheme of Investigation (WSI) for archaeological
mitigation measures and an advisory note that the Applicant ensures they have all
necessary legal permissions for any elements of their archaeological
mitigation. Specifically, in regard to the RAF Hudson aircraft crash site mitigation
proposals which may require a license from the MoD if it is to be disturbed. 
4. Public Access – Argyll and Bute Council has no objection in respect to Public Access
subject to advisory notes being attached to any consent to ensure that any Access
Controls i.e. gates, and cattle grids comply with the British Horse Society Guidance. 
Furthermore, that public access during construction should comply with NatureScot
guidance ‘Good practice during wind farm construction.’ 
5. Landscape & Visual Impact - Argyll and Bute Council also intends to object to the
application on the basis of NPF 4 policies 4a and 11 Section E, Paragraphs 2, 3, 4 and
13 and LDP2 Policy 30 on the basis that the application would have a cumulative,
significant and unacceptable adverse impact in respect of landscape, visual and
cumulative matters and that a detailed representation would be submitted following
consideration of the matter at the next scheduled meeting of PPSL Committee. 
In the event the ECU grants consent it was recommended that a condition to
secure further aviation lighting mitigation in the form of an Aircraft Detection Lighting
System be attached to such a consent. 
6. Biodiversity Impact - Argyll and Bute Council has no objection in respect to Biodiversity
Impact, subject to conditions to secure the recommendations of the Local Biodiversity
Officer being attached to any consent. 
7. Noise Impact - Argyll and Bute Council has no objection in respect to noise
impact, subject to suitably worded conditions to limit the noise levels, tonality, and
amplitude modulation to control noise levels from the proposal and provide appropriate
noise mitigation as recommended and agreed by the Council’s Noise Consultant being
attached to any consent.

Page 13

8. Flood Risk - Argyll and Bute has no objection in respect to flood risk subject to
conditions to secure the recommendations of the Flood Risk Assessor being attached
to any consent: 
• To ensure watercourse crossings are designed to convey the 1 in 200 year plus
climate change flood event.
• Surface water drainage is designed in accordance with CIRIA C753 and
ensures that post development surface water runoff does not exceed the pre-
development surface water runoff. The surface water drainage should be in
operation prior to the start of construction. 
9. Argyll and Bute Council requests that all conditions recommended by other consultees
are included in any Consent with exception to the condition requiring removal of 5
turbines referred to at (1) above. 
(Reference: Report by Head of Development and Economic Growth dated 9 January 2026
and supplementary report number 1 dated 20 January 2026, submitted) 
Councillor John Armour left the meeting at 12.33 pm during consideration of the foregoing
item. 
The Chair, Councillor Gordon Blair, left the meeting at 12.45 pm during consideration of
the foregoing item.  The Vice Chair, Councillor Kieron Green, assumed the role of Chair at
this point.