Page 1

Argyll & Bute Health & Social Care Partnership
Internal Audit Report
June 2022
FINAL 
High Medium Low VFM
Number of Findings 1 0 0 0 
Workforce Planning
Audit Opinion: Reasonable

Page 2

2 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Workforce Planning, June
2022 
Contents 
1. Executive Summary .............................................................................................................. 3
Introduction................................................................................................................................. 3
Background.................................................................................................................................. 3
Scope........................................................................................................................................... 4
Risks ............................................................................................................................................ 4
Audit Opinion .............................................................................................................................. 4
Recommendations ....................................................................................................................... 5
2. Objectives and Summary Assessment.................................................................................... 5
3. Detailed Findings .................................................................................................................. 5
Appendix 1 – Action Plan.............................................................................................................. 9
Appendix 2 – Audit Opinion........................................................................................................ 11 
Contact Details 
Internal Auditor: David Sullivan 
Telephone:  01546 604125
e-mail:   david.sullivan@argyll-bute.gov.uk 
www.argyll-bute.gov.uk

Page 3

3 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Workforce Planning, June
2022
1. Executive Summary
Introduction
1. As part of the 2021/22 internal audit plan, approved by the Audit & Risk Committee in April
2021, we have undertaken an audit of Argyll & Bute Health & Social Care Partnership (HSCP)
system of internal control and governance in relation to Workforce Planning. 
2. The audit was conducted in accordance with the Public Sector Internal Audit Standards (PSIAS)
with our conclusions based on discussions with Health & Social Care Partnership officers and the
information available at the time the fieldwork was performed. The findings outlined in this
report are only those which have come to our attention during the course of our normal audit
work and are not necessarily all the issues which may exist. Appendix 1 to this report includes
agreed actions to strengthen internal control however it is the responsibility of management to
determine the extent of the internal control system appropriate to the HSCP. 
3. The contents of this report have been agreed with the appropriate Health & Social Care
Partnership officers to confirm factual accuracy and appreciation is due for the cooperation and
assistance received from all officers over the course of the audit.
Background
4. Workforce planning is a key business process which aligns changing organisation needs with
people strategy.  Workforce planning is the process of ensuring that you have the right number
of people, with the right skills, employed in the right place at the right time to deliver the
organisations short and long term objectives.   
5. Workforce planning is about generating information, analysing it to inform future demand of
people and skills, and translating the information into a set of actions that will develop and build
on the existing workforce to meet demand.  It is also about determining future workforce needs
and identifying workforce gaps against future needs.  One of the seven areas of priority in the
HSCP Strategic Plan 2019/20 – 2021/22 (The Strategic Plan) is to efficiently and effectively
manage all resources to deliver best value. 
6. The Strategic Plan recognises that the HSCP need to support staff as they transform the way they
deliver services in the future and recognise the need to have valued, skilled, motivated, flexible
workforce to transform together to deliver the changes required.  The Strategic Plan details the
steps to be taken to meet their goals, including implementing the National Health & Social Care
Workforce Plans, reviewing the Organisational Development Strategy and developing a plan to
support the workforce. 
7. Employees are one of the HSCP’s core resources, are at the heart of what we do and at the
frontline of all services we deliver. The HSCP workforce includes employees of two different
organisations, Argyll and Bute Council (the Council) and NHS Highland (NHSH), as well as people
in many organisations and individuals that contribute as part of an overall workforce delivering
health and social care.  The Strategic Plan recognises that the workforce is vital to support the
delivery of the HSCP’s vision and that they need to feel valued and be skilled, motivated and
flexible to support the HSCP.  The HSCP recognise the need to attract and retain their workforce

Page 4

4 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Workforce Planning, June
2022
and invest in training and development, and involve the workforce in shaping how future
services look. 
8. The National Health and Social Care Workforce Plan (National Workforce Plan), published by the
Scottish Government in June 2017, marked the beginning of a process to further improve
workforce planning across health and social care.  Its overall aim is to support organisations
which provide health and social care services to identify, develop and put in place the workforce
they need to deliver safe and sustainable services to Scotland’s people.  A “Six Step
Methodology to Integrated Workforce Planning” has been designed by Skills for Health as a
practical approach to planning that ensures you have a workforce of the right size with the right
skills and competencies. 
9. Workforce planning is the responsibility of management within the HSCP and receives support
from the Council to enable this planning.  The alignment between the Council and the NHS is
essential to the development of the workforce in the integrated services.   
10. Integrated authorities are required to ensure that a draft 3 year Workforce Plan (WP) is
developed no later than 31 July 2022 and should cover the period 1 April 2022 to 31 March
2025. Once analysis and feedback on the plan has taken place HSCP should publish a final
version of the plan on their website no later than October 2022.
Scope 
11. The scope of the audit was to review the progress being made to meet the deadline of July 31
2022 for the draft 3 year Workforce Plan to be submitted to the Scottish Government.
Risks
12.  The risks considered throughout the audit were:
 Audit Risk 1: an effective draft workforce plan has not been developed
 Audit Risk 2: the HSCP has failed to collate and analyse the detailed information and
priority arears for workforce planning
 SRR 10 : Inability to recruit and retain the required workforce because of National
workforce and Local challenges
Audit Opinion
13. We provide an overall audit opinion for all the audits we conduct. This is based on our
judgement on the level of assurance which we can take over the established internal controls,
governance and management of risk as evidenced by our audit work.  Full details of the five
possible categories of audit opinion is provided in Appendix 2 to this report. 
14. Our overall audit opinion for this audit is that we can take a reasonable level of assurance
subject to the intimation by relevant officers that this workforce plan will be submitted in time
to the Scottish Government in July. This means that internal control, governance and the
management of risk are broadly reliable. However, whilst not displaying a general trend, there
are areas of concern which have been identified where elements of residual risk or weakness
may put some of the system objectives at risk.

Page 5

5 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Workforce Planning, June
2022
Recommendations
15. We have highlighted one high priority recommendation where we believe there is scope to
strengthen the control and governance environment. These are summarised below:
 HSCP should ensure that the draft HSCP 3 year Workforce Plan is submitted by 31 July
2022. 
16. Full details of the audit findings, recommendations and management responses can be found in
Section 3 of this report and in the action plan at Appendix 1.
2. Objectives and Summary Assessment
17. Exhibit 1 sets out the control objectives identified during the planning phase of the audit and our
assessment against each objective.
Exhibit 1 – Summary Assessment of Control Objectives 
Control Objective Link to Risk Assessment Summary Conclusion
1 An effective draft
workforce plan has
been developed and
will be produced by
31st July 2022
Risk 1
SRR 10
Limited
Assurance
The HSCP workforce planning team are
currently working on the draft plan,
however at the time of the audit the
draft document was not available for
review. An IJB workforce planning
development session was recently held
which Internal audit attended.
Conclusions from the session indicate
that the workforce planning team are
following the guidance supplied by the
Scottish Government (SG).  In addition
those in attendance at the
development session are assured that
sufficient progress is being made to
meet the submission deadline of 31
July.
2 The HSCP has
collated and
analysed detailed
information and
priority areas for
workforce planning
Risk 2
SRR 10
Reasonable Discussions with the workforce
planning team and assessment made
from the development session lead
Internal Audit to conclude that the
HSCP have addressed or are currently
addressing the requirements as laid
out within the SG guidance. 
18. Further details of our conclusions against each control objective can be found in Section 3 of this
report.  
3. Detailed Findings
An effective draft workforce plan has been developed and implemented
19. Guidance provided by the Scottish Government to the HSCP’S in April 2022 clearly sets out the
processes that the HSCP should follow during the preparation of the 3 year Workforce Plan. The

Page 6

6 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Workforce Planning, June
2022
workforce plans are expected to use the “Six Step Methodology to Integrated Workforce
Planning” as deigned by Skills for Health as a practical approach to ensure they have a workforce
of the right size with the right skills and competencies as well as the Five Pillars of Workforce
Planning outlined within the National Workforce Strategy (Plan, Attract, Train, Employ, Nurture)
as the basis for outlining proposed actions to secure sufficient workforce to meet local projected
short-term recovery and medium-term growth requirements across the health and/or social
care services you manage. 
20. Appendix 1 of the SG guidance sets out an indicative checklist for the HSCP to consider when
preparing their plans, the aim of which is to ensure that HSCP have covered all areas within their
draft plan. The checklist covers in detail the following : 
 methodology 
 partnership working
 alignment with other strategic documents
 planning the required workforce
 action planning
 staff wellbeing
 summary of actions
 implementing and review 
21. A development session was held on 15 June 2022 the aim of which was to advise stakeholders of
the progress being made towards meeting the requirement to submit the draft 3 year workforce
plan to the Scottish Government by 31 July.  Internal audit attended the development session
along with other stakeholders, including the Chief Officer of the HSCP and members of the
Integrated Joint Board.  
22. Due to the limited engagement between Internal audit and the HSCP workforce planning team,
reliance has been placed on the information provided during the development session to
appraise progress being made towards meeting the 31 July 2022 deadline.  In addition,
discussions with the workforce planning team leader confirmed all areas required within the
guidance checklist had been or is currently being addressed. 
23. Discussions with the workforce planning team and assessment made from the development
session confirm the HSCP have addressed or are addressing the requirements as laid out within
the Scottish Government guidance.  In addition those in attendance at the development session
are assured that sufficient progress is being made to meet the submission deadline of 31 July.
Action Plan 1
The HSCP has collated and analysed detailed information and priority areas for workforce planning
24. A summary of the progress being made against each of the areas summarised within the
guidance outlined in paragraph 20 is detailed in the table below.

Page 7

7 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Workforce Planning, June
2022
Area to be
considered
Example of content Comment Progress to meet
deadline if 31 July
2022
Methodology Workforce Plan has
been developed using
a methodology
appropriate to the
organisation’s needs. 
HSCP have broadly
based their
methodology on the 5
pillars of workforce
planning as required
by the Scottish
Government.
N/A
Partnership Working Meetings and
facilitated sessions
have been held with
service leads, SLT,
Scottish Care as
independent sector
representatives. Chief
Social Work Officers,
Primary care lead and
Finance. Facilitated
session to be held
with Joint Partnership
Forum prior to first
draft submission.
Meets the
requirements as
outlined in guidance.
On track
Alignment with other
Strategic Documents
Reflects service
priorities in
operational plans and
strategic plan. 
The workforce plan
will be fully aligned to
the strategic
document, including
the workforce risks
and actions
identified. Funding
will be reflected
within the plan.
On track
Planning the required
workforce
The Workforce
Planning document
will describe how the
workforce will
support recovery,
growth and
transformation.
The workforce plan
should analyse the
health and social care
needs of the
population and
identifies the impact
on local workforce
demand.
The risks/actions
within the plan are
aligned to the
strategic priorities
each of which are
focussed on
recovery/growth and
transformation. 
Risks around cost of
living crisis, energy
costs, and labour
market issues among
others have been
considered and are to
be further developed.
On track
Action Planning  Describes areas of
workforce skill
development.  
Currently being
developed.
On track

Page 8

8 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Workforce Planning, June
2022
Describes the needs
for new posts; 
Details local actions.
Staff Wellbeing  Workforce plan
should describe
actions supporting
the health and
wellbeing of the
workforce.
The plan should
consider diversity and
inclusions.
Plan should describe
key workforce issues
affecting the quality
of staff experience
and projected impact
of these on staff
retention.
Currently being
developed.
On track
Summary of Actions  All actions are
summarised and
aligned to the 5
pillars.
Currently being
developed.
On track
Implement and
Review 
Identify targets. Slides outlined
actions/targets to be
considered.
The strategic
workforce planning
group will oversee
the work streams
tasked with delivery
of the actions within
the workforce plan.
On track 
25.  As the development of the draft Workforce Plan is ongoing we were unable to undertake a full
audit of Workforce Planning. Consideration will be given to undertaking a full audit of Workforce
Planning in due course.

Page 9

Appendix 1 – Action Plan 
No Finding Risk Agreed Action Responsibility / Due Date
High
1 Draft Workforce Plan 
HSCP should ensure that the draft Workforce Plan is
submitted to the Scottish Government by 31 July. 
Failure to meet Scottish
Government deadline. 
To ensure that the first
draft of the workforce
plan will be consulted
upon, drafted and
submitted by 31 July. It
is noted that it is
expected that there will
be further iterations of
the document between
July and October as the
plan is finalised. 
Head of People Planning,
Analytics and Reward 
30 September 2022

Page 10

10 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Workforce Planning, June 2022
In order to assist management in using our reports a system of grading audit findings has been adopted to allow the significance of findings to be ascertained. 
The definitions of each classification are as follows: 
Grading    Definition
High  A major observation on high level controls and other important internal controls or a significant matter relating to the critical success of the
objectives of the system.  The weakness may therefore give rise to loss or error. 
Medium 
Observations on less significant internal controls and/or improvements to the efficiency and effectiveness of controls which will assist in meeting
the objectives of the system.  The weakness is not necessarily substantial however the risk of error would be significantly reduced if corrective
action was taken.  
Low  Minor recommendations to improve the efficiency and effectiveness of controls or an isolated issue subsequently corrected.  The weakness does
not appear to significantly affect the ability of the system to meet its objectives. 
VFM  An observation which does not highlight an issue relating to internal controls but represents a possible opportunity for the HSCP to achieve better
value for money (VFM).

Page 11

11 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Workforce Planning, June 2022
Appendix 2 – Audit Opinion 
Level of Assurance  Definition 
High 
Internal control, governance and the management of risk are at a high standard. Only marginal elements of residual risk have
been identified with these either being accepted or dealt with. A sound system of control designed to achieve the system
objectives is in place and being applied consistently. 
Substantial 
Internal control, governance and the management of risk is sound. However, there are minor areas of weakness which put some
system objectives at risk and specific elements of residual risk that are slightly above an acceptable level and need to be
addressed within a reasonable timescale. 
Reasonable 
Internal control, governance and the management of risk are broadly reliable. However, whilst not displaying a general trend,
there are areas of concern which have been identified where elements of residual risk or weakness may put some of the
system objectives at risk. 
Limited 
Internal control, governance and the management of risk are displaying a general trend of unacceptable residual risk above an
acceptable level and placing system objectives are at risk. Weakness must be addressed with a reasonable timescale with
management allocating appropriate resources to the issues raised. 
No Assurance 
Internal control, governance and the management of risk is poor. Significant residual risk and/or significant non-compliance with
basic controls exists leaving the system open to error, loss or abuse. Residual risk must be addressed immediately with
management allocating appropriate resources to the issues.