Democracy Spraffa

2021_22_InternalAudit_EMA Veification_report_Final

Argyll and Bute Council · 15 September 2022
Back to Audit and Scrutiny Committee — 15 September 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council
Internal Audit Report
July 2022
FINAL 
High Medium Low VFM
Number of
Findings
0 0 0 0 
Education Maintenance
Allowance-Verification Audit
Audit Opinion: High

Page 2

2 
Argyll and Bute Council – Internal Audit Report – EMA Verification audit, July 2022 
Contents 
1. Executive Summary ........................................................................................................................ 3
Introduction ............................................................................................................................................ 3
Background ............................................................................................................................................. 3
Scope ....................................................................................................................................................... 3
Risks ........................................................................................................................................................ 3
Audit Opinion ......................................................................................................................................... 4
2. Objectives and Summary Assessment ........................................................................................... 4
3. Detailed Findings ............................................................................................................................ 4
Appendix 1 – Audit Opinion ................................................................................................................... 7 
Contact Details 
Internal Auditor: David Sullivan 
Telephone:  01546 604125 
e-mail:   david.sullivan@argyll-bute.gov.uk 
www.argyll-bute.gov.uk

Page 3

3 
Argyll and Bute Council – Internal Audit Report – EMA Verification audit, July 2022
1. Executive Summary
Introduction
1. As part of the 2021/22 internal audit plan, approved by the Audit & Scrutiny Committee in
March 2022, we have undertaken an audit of Argyll and Bute Council’s (the Council) system of
internal control and governance in relation to Education maintenance Allowance (EMA)
Verification.
2. The audit was conducted in accordance with the Public Sector Internal Audit Standards (PSIAS)
with our conclusions based on discussions with council officers and the information available at
the time the fieldwork was performed. The findings outlined in this report are only those which
have come to our attention during the course of our normal audit work and are not necessarily
all the issues which may exist.  It is the responsibility of management to determine the extent of
the internal control system appropriate to the Council.
3. The contents of this report have been agreed with the appropriate council officers to confirm
factual accuracy and appreciation is due for the cooperation and assistance received from all
officers over the course of the audit.
Background
4. The Education Maintenance Allowance (EMA) programme offers means-tested financial support
of up to £1,560 each year to encourage eligible young people from low income households to
remain in non-advanced post-compulsory education. The education may be provided in schools,
at home, or in the community. It therefore includes young people not enrolled at school who
agree to take part in a programme which helps them to become ready for formal learning.
5. Eligibility for EMA payments depends on the young person's age, household income, and
residency, as well as the validity of the course. Argyll and Bute Council manages the delivery of
the EMA programme in respect of schools, home education, and all other learning.
6. EMA payments comprise a weekly allowance of £30 and are made by the council to eligible
young people. The Scottish Government (SG) reimburses the costs incurred by the council
through monthly payments of grant. There is also a statement of the total monthly amounts
submitted after the end of the year. An allowance for the costs of administering the programme
is also paid by the SG.
7. The SG have published technical guidelines namely TGM-EMA-21 to support auditors in the
verification of EMA claims.
Scope 
8. The scope of the audit was to assess that the Council is fully compliant with the Scottish
Government guidelines document TGM-EMA 21.
Risks
9.  The risks considered throughout the audit were:

Page 4

4 
Argyll and Bute Council – Internal Audit Report – EMA Verification audit, July 2022
 Audit Risk 1 – The Council fails to comply with the Scottish Governments document TGM-
EMA-21
Audit Opinion
10. We provide an overall audit opinion for all the audits we conduct. This is based on our
judgement on the level of assurance which we can take over the established internal controls,
governance and management of risk as evidenced by our audit work.  Full details of the five
possible categories of audit opinion is provided in Appendix 1 to this report.
11. Our overall audit opinion for this audit is that we can take a high level of assurance.  This means
that, internal control, governance and the management of risk are at a high standard. Only
marginal elements of residual risk have been identified with these either being accepted or dealt
with. A sound system of control designed to achieve the system objectives is in place and being
applied consistently.
2. Objectives and Summary Assessment
12. Exhibit 1 sets out the control objectives identified during the planning phase of the audit and our
assessment against each objective.   
Control Objective Link to Risk Assessment Summary Conclusion
1 The Council is fully
compliant with the
Scottish
Government
guidelines TGM-
EMA-21
Audit Risk 1 High Internal audit confirm that the grant
claim for 2021-22 for EMA is fully
compliant with the SG guidelines
document TGM-EMA-21. 
13. Further details of our conclusions against each control objective can be found in Section 3 of this
report.  
3. Detailed Findings
The Council is fully compliant with the Scottish Government guidelines TGM-EMA-21
14. The Councils arrangements for the completion of the year end statement are adequate. All
relevant parts of the year end statement have been completed including certification of the
statement by the section 95 officer.
15. Internal audit confirmed that the entries on the year-end statement agreed back to the total
monthly claims.
16. A total of 204 students were eligible for EMA payments in 2021-22. A random sample of 10
records was chosen from the database and the following checks were made as regards the
eligibility criteria as specified with the Scottish Government guidelines namely eligibility in
regard to:
 Proof of age
 Income criteria
 Residency in Scotland

Page 5

5 
Argyll and Bute Council – Internal Audit Report – EMA Verification audit, July 2022
 Valid course undertaken
 Learning agreement of activity received
 Attendance at courses confirmed 
17. A review of the evidence supplied confirmed that all records examined were fully consistent
with the eligibility criteria specified within the Scottish Governments guidelines document TGM-
EMA. 
18. Internal Audit confirmed that the additional administration cost of £3,105 recovered from the
SG was consistent with the scheme requirements.

Page 6

In order to assist management in using our reports a system of grading audit findings has been adopted to allow the significance of findings to be ascertained. 
The definitions of each classification are as follows: 
Grading    Definition
High  A major observation on high level controls and other important internal controls or a significant matter relating to the critical success of the
objectives of the system.  The weakness may therefore give rise to loss or error. 
Medium 
Observations on less significant internal controls and/or improvements to the efficiency and effectiveness of controls which will assist in meeting
the objectives of the system.  The weakness is not necessarily substantial however the risk of error would be significantly reduced if corrective
action was taken.  
Low  Minor recommendations to improve the efficiency and effectiveness of controls or an isolated issue subsequently corrected.  The weakness does
not appear to significantly affect the ability of the system to meet its objectives. 
VFM  An observation which does not highlight an issue relating to internal controls but represents a possible opportunity for the council to achieve
better value for money (VFM).

Page 7

7 
Argyll and Bute Council – Internal Audit Report – EMA Verification audit, July 2022
Appendix 1 – Audit Opinion 
Level of Assurance  Definition 
High 
Internal control, governance and the management of risk are at a high standard. Only marginal elements of residual risk have
been identified with these either being accepted or dealt with. A sound system of control designed to achieve the system
objectives is in place and being applied consistently. 
Substantial 
Internal control, governance and the management of risk is sound. However, there are minor areas of weakness which put some
system objectives at risk and specific elements of residual risk that are slightly above an acceptable level and need to be
addressed within a reasonable timescale. 
Reasonable 
Internal control, governance and the management of risk are broadly reliable. However, whilst not displaying a general trend,
there are areas of concern which have been identified where elements of residual risk or weakness may put some of the system
objectives at risk. 
Limited 
Internal control, governance and the management of risk are displaying a general trend of unacceptable residual risk above an
acceptable level and placing system objectives are at risk. Weakness must be addressed with a reasonable timescale with
management allocating appropriate resources to the issues raised. 
No Assurance 
Internal control, governance and the management of risk is poor. Significant residual risk and/or significant non-compliance with
basic controls exists leaving the system open to error, loss or abuse. Residual risk must be addressed immediately with
management allocating appropriate resources to the issues.