Page 1

1 
ARGYLL AND BUTE COUNCIL AUDIT AND SCRUTINY
COMMITTEE 
CHIEF EXECUTIVE     20 DECEMBER 2022 
COUNCIL 6-MONTH PERFORMANCE REPORT – APRIL TO SEPTEMBER 2022
__________________________________________________________________ 
1. SUMMARY 
1.1 The Performance and Improvement Framework (PIF) sets out the process for
presenting the Council’s performance reports. 
This paper presents the Council’s 6-month Performance Report for April to
September 2022. 
It is recommended that the Audit and Scrutiny Committee: 
1.2 Note that this report presents Council performance on strategic activities across all
services; 
1.3 Review and scrutinise the Councils 6-month Performance Report; 
1.4 Note that the Strategic and Area Committees have responsibility to scrutinise
operational performance; 
1.5 Note the planned activity for Performance Management and Reporting during
2022/23 onwards. 
Pippa Milne
Chief Executive

Page 2

2 
ARGYLL AND BUTE COUNCIL AUDIT AND SCRUTINY
COMMITTEE
CHIEF EXECUTIVE     20 DECEMBER 2022
___________________________________________________________________ 
COUNCIL 6-MONTH PERFORMANCE REPORT – APRIL TO SEPTEMBER 2022 
2. SUMMARY 
2.1 The Performance and Improvement Framework (PIF) sets out the process for
presenting the Council’s performance reports. 
2.2 The paper identifies the strategic activities across council services that have
occurred during the reporting period, reports on key performance and outlines the
planned activity for Performance Management and Reporting commencing
2022/23 
3. RECOMMENDATIONS
It is recommended that the Audit and Scrutiny Committee: 
3.1 Note that this report presents Council performance on strategic activities across all
services; 
3.2 Review and scrutinise the Councils 6-month Performance Report; 
3.3 Note that the Strategic and Area Committees have responsibility to scrutinise
operational performance; 
3.4 Note the planned activity for Performance Management and Reporting during
2022/23 onwards. 
4. DETAIL 
4.1 The Performance and Improvement Framework (PIF) was approved by the
Council in September 2017. The PIF sets out the agreed framework for planning,
monitoring and reporting the Councils performance. 
4.2 To support scrutiny of performance by Elected Members and Senior Officers in
September 2020 the Performance Management Project commenced. An output
of the project to date has been to identify a suite of 47 high-level indicators
aligned to the Corporate Outcomes. These 47 indicators are known as the
Corporate Outcome Indicators – COIs. The majority of the COIs are reported
annually after FQ4 with the exception of 13 COIs which are reported quarterly to

Page 3

3 
the Area Committees. The full list of the 47 Corporate Outcome Indicators is
attached, however work is in progress to finalise the wording for some indicators
(Appendix 1).  
4.3 The following sections detail the Council’s Management Information which are
high-level cross cutting themes such as absence, risks and complaints along
with Council activities to note.   
4.4 Absence  
Absence data for FQ1 22/23 saw increases for both Teachers and LGE on the
same quarter last year. In FQ2 22/23 teacher absence has reduced by half a day
on the same quarter last year, whereas LGE absence has increased by half a
day. 
It should be noted that sickness levels are always lowest in FQ2 for both LGE
and Teachers due to the summer holiday period.   
Figure 1:  Teacher and LGE Absence trends across each quarter since 20/21 
The top three reasons for absence in both FQ1 and FQ2 22/23 have been – 
 Stress/Depression/Mental Health
 Infections
 Other Musculoskeletal Reasons (Fracture and broken bone. This does
not include back and neck pain which has its own category) 
This is quite different from the same two quarters last year the top three reasons
being – 
 Stress/Depression/Mental Health
 Stomach/Liver/Kidney/Digestive
FQ1
20/21
FQ2
20/21
FQ3
20/21
FQ4
20/21
FQ1
21/22
FQ2
21/22
FQ3
21/22
FQ4
21/22
FQ1
22/23
FQ2
22/23
LGE 1.59 1.89 2.94 2.82 3.32 3.16 3.49 3.42 3.57 3.66
TEACHER 0.82 0.92 1.52 1.15 1.36 0.89 1.6 1.77 1.79 1.22
1.59
1.89
2.94 2.82
3.32 3.16
3.49 3.42 3.57 3.66
0.82 0.92
1.52
1.15 1.36
0.89
1.6 1.77 1.79
1.22
0
0.5
1
1.5
2
2.5
3
3.5
4
LGE
TEACHER

Page 4

4 
 Medical Treatment
With no Covid restrictions and Covid related absence now counting in normal
sickness absence reporting figures the increase in days lost due to infections
was anticipated. However, as the NHS moves back towards business as usual a
rise in absences due to Medical Treatment has not been seen. 
The following is the analysis of the reasons for absence across the service
conditions of APTC, Manual and Teachers for all work days lost - 
 For APTC staff it was Stress/Depression/Mental Health accounting for
20% 
 For Manual Workers it was Stress/Depression/Mental Health accounting
for 34%   
 For Teachers the top reason for absence was Infections accounting for
28% 
Following consultation with staff and managers the Supporting Attendance and
Stress in the Workplace procedures were simplified and improved last year. Both
procedures are intended to have a positive impact on reducing absence. A
survey will be conducted in December 2022 to establish the impact and
customer satisfaction of the above procedures.   
The focus of the Wellbeing Team has been on supporting managers dealing with
long term absence, particularly within the HSCP. However, despite this we have
seen a continued increase in absence in this area and this must be investigated
further. Another new wellbeing initiative has just been launched in October 2022.
The Recalibrate Programme focuses on a range of lifestyle subjects and is
designed to help build healthy habits that support positive health and wellbeing.
This programme is being delivered via Teams over a 12-week period. 
4.5 Quality Conversations 
The Quality conversations approach has replaced the Council’s previous PRD
process. The focus is on ensuring managers and employees have conversations
about performance, learning and career aspirations throughout the year. The
desired outcomes are that employees are clear about what is expected of them
and have the skills and knowledge to deliver on their agreed objectives. The
approach also aims to ensure that managers feel confident and have the skills to
agree objectives with employees and deliver quality feedback and recognition for
their work, or discuss barriers to performance as well as employee career
aspirations. The previous approach did not measure these outcomes and so
initial baseline surveys for both employees and managers took place during
summer 2022.

Page 5

5 
The employee survey consisted of 11 questions, and the manager survey
consisted of 8 questions. Initial indications from the employee survey are that
employees know what is expected of them in their role, including the behaviours
expected, and have the knowledge and skills required to deliver their objectives. 
These surveys are currently being analysed by the HR and OD team, who
continue to support departments with the roll out of the quality conversation
approach. Feedback from the baseline surveys will be used to provide more
targeted support across the organisation. 
Going forward we will be surveying employees annually. Additionally, we will be
surveying managers on their handling of Quality Conversations, this is a
perspective we have not had from PRDs. 
4.6 Complaints   
The first 2 quarters of 2022/23 saw the number of complaints rising compared
with the last 2 quarters of 2021/22. During FQ1 and FQ2 there were 274 Stage 1
Complaints and 120 Stage 2 Complaints received. Roads and Infrastructure
Services continues to receive the majority of complaints. Performance within
timescale has decreased over the recent 2 quarters and the Compliance and
Regulatory team will continue to support services to try to improve this. 
The table below provides a breakdown by Service. A detailed Annual 
Complaints Report will be submitted to this Committee meeting. 
Stage 1 Stage 2 
Total
number
Number
in time
%
within
time
Total
number
Number
in time
%
within
time
Chief Executives      
Directorate  0 0 - 1 1 100%
Financial Services 16 13 81% 4 3 75%
Community Planning
& Development
0 0 - 0 0 -
Executive Director
Douglas Hendry      
Directorate 3 3 100% 0 0 -
Education 13 13 100% 18 15 83%
Legal and Regulatory
Support
4 4 100% 7 6 86%
Commercial Services 4 4 100% 0 0 -
Executive Director
Kirsty Flanagan      
Directorate 0 0 - 0 0 -

Page 6

6 
Customer Support
Services
5 5 100% 0 0 -
Roads and
Infrastructure
180 146 81% 55 33 60%
Development and
Economic Growth
32 23 72% 12 6 50%
Health & Social
Care Partnership      
Adult Care - Health &
Community Care
3 3 100% 7 3 43%
Adult Care - Acute &
Complex Care
1 1 100% 5 1 20%
Children and
Families & Criminal
Justice
12 8 67% 11 6 55%
Live Argyll      
Live Argyll 1 1 100% 0 0 -
Overall Totals 274 224 82% 120 74 62% 
4.7 Audit Recommendations 
Internal and External Audit Reports are presented at this committee meeting. 
Audit recommendations are reported quarterly to the Strategic Management 
Team and actions to complete them are recorded and allocated to the 
responsible officers.  
4.8 Finance 
The performance against budget for the first six months of financial year 2022-
23 is a forecast overspend of £0.395m or 0.1%. For reference the 2021-22
forecast overspend as at September 2021 was £0.399m or 0.2%.   
Social Work, managed by the Health and Social Care Partnership, is reporting a
forecast overspend of £0.263m due to a high demand for Services. Within
Executive Director Kirsty Flanagan, there is a forecast overspend of £0.106m
mainly from an under-recovery of income within Parks and Pest Control. Central
Budgets are projecting an £0.026m overspend resulting from the Elected
Members pay award, which is set nationally via Statutory Instrument, being
greater than the available budget. 
It should be noted that the above forecast overspend does not include the
potential impact of the 2022-23 pay settlement, where negotiations were not
finalised as at the end of September 2022.

Page 7

7 
4.9 Strategic Risk Register (SRR) 
The Strategic Risk Register (SRR) details significant challenges and the agreed
approaches to manage them. These specific interventions are subject to scrutiny
at Strategic Committee Level and kept under review by the Council’s Strategic
Management Team. 
The reported SRR has twelve risks in total. Three are red, six are amber and the
remaining three are green. The three red risks relate to population and economic
decline, Waste Management, and Cyber Security. 
4.10 Operational Risks 
Executive Director Kirsty Flanagan has six red risks. These relate to the cost of
delivering environmental health services in relation to public health; the impact of
extreme weather on both the road network and the cost of winter maintenance;
waste disposal; the affordability of maintaining ageing bridges and retaining
walls on the road network and cyber security breach and associated attack. 
Executive Director Douglas Hendry has five red risks. These relate to delivery
failure of school kitchen supplies; capital investment to keep buildings safe and
operational; the availability of resources and funding to delivery capital projects;
compliance with the conditions of externally funded projects and increasing utility
costs associated with gas, electricity, oil etc. 
Key actions have been agreed to address these red risks and all other risks in
the operational risk registers. 
Other Strategic Activities 
4.11 Education 
Achievements
Dunoon Grammar School received an accolade as the World’s Best School for
Community Collaboration at the World’s Best School Prizes.  The winners of the
5 categories share a cash prize of US $250,000.  This is truly outstanding
achievement and as CEO I wish to highlight the key role of the Head Teacher
David Mitchell and his staff for their leadership to their pupils who are the stars of
this award. 
Attainment
The Annual Participation Measure on the economic and employment activity of
16 – 19 year olds showed a 0.4% rise for Argyll and Bute compared to 2021 with

Page 8

8 
93.6% of young people in education employment or training.  Argyll and Bute
placed 5th out of the 32 local authorities.  
A Nurturing Council
A further ten schools in Argyll and Bute achieved accreditation for developing
nurturing cultures in their school communities bringing the total number of
schools to 18.  Part of the Council’s ‘Our Children, Their Nurturing Education’
strategy which aims to ensure that our young people have the emotional support
they require to survive.  Led by the Council’s Educational Psychology service,
the programme helps staff to better understand learner’s behaviours and put into
practice nurturing approaches to support them including children showing signs
of distressed behaviour. 
A Leading Council
In a UK first, the Council has teamed up with leading drone specialists to trial the
use of Unmanned Aerial Vehicles (drones) in delivering school meals. Flying
from Oban Airport, the trial involved delivering meals freshly prepared in Oban to
Lochnell Primary 1.5km away.  Whilst the majority of our schools have kitchens
on site preparing meals, the provision of school meals to some rural and remote
schools rely on traditional methods of transport including vans, taxis and ferries
which can be affected by weather conditions. All pupils in early years and P1 -
P5 are entitled to free school meals and the use of drones may offer an
alternative carbon free mode of transport that could reduce costs and delivery
times.  The trials are part of ambitious plans to create an Unmanned Aerial
Vehicle Innovations Logistics Hub at Oban Airport.   
LEIP – Learning Estates Investment Programme
Further to engagement with residents, the Council agreed to submit a business
case and funding application to the Scottish Government for a new school
campus on Mull.  This is the beginning of a competitive bidding process which if
successful will require a major financial commitment to the project from the
Council. 
4.12 Place 
Current Large Scale Capital Investment
The Council is currently delivering across 18 large scale projects worth £35m to the
area of which the Council’s contribution is over £5m.  Projects includes the following; 
 £10m Conservation Area Regeneration Schemes and Townscape Heritage
across Helensburgh, Dunoon, Lochgilphead and Rothesay.
 £10m Regeneration Capital Grant Funding (Scottish Government’s RCGF)
supporting 15 projects including Tiree Community Business Hub, Kerrera Old
School Community Hub and Ulva Ferry Shore Facilities Building.

Page 9

9 
 Scottish Government Place Based Investment (£821,000). Projects include a
regional shopfront improvement scheme, public realm improvement works in
Oban and Bowmore, priority building repairs in Rothesay and Dunoon and pier
resurfacing works in Helensburgh.
 Scottish Government Islands Programme (£740,000); investment for ten projects
on Jura, Gigha, Tiree, Kerrera, Mull, Iona, Islay, Colonsay and Rothesay. 
 Scotland Loves Local (£46,000); supporting local economics and encouraging
shopping locally. 
 £1.5m public realm project to transform Lochgilphead Front Green to create a
new public square, play park, additional seating, new waling and cycling facilities
was completed.  Thanks to the funding partners:- the Cooperative’s Local
Community Fund, the Lochgilphead Phoenix Project and two Scottish
Government funds, Cycling, Walking and Safer Routes (CWSR) and Town
Centre Funds. 
Work to improve the waterfront in Ardrishaig has commenced.  The £700,000
scheme will create a new public square, improved car parking,  additional seating
within a new loch-side viewing area,  art work and improved accessibility for the
Argyll Sea Kayak Trail to make it easier for kayakers to go between Loch Fyne and
the Crinan Canal. 
The new £23m leisure centre and swimming pool was completed on time and
budget.  Part of a wider waterfront regeneration strategy, the facilities includes a
luxury health suite with steam room and sauna, a café, shop, fitness studios and a
gym with panoramic views of the river Clyde.  The project includes new flood
defences on the waterfront.  Thanks to the UK Government from £5m from the Libor
Fund and £100,000 from Sports Scotland. 
Helensburgh Pier received £345,000 to improve the appearance and add to the
overall improvement works at the waterfront.  Funded by Crown Estates Scotland
and the Scottish Government’s Placed Based Investment Programme, work started
July for an eight week period. 
Planned Capital Programmes
In September the Council’s Environment, Development and Infrastructure
Committee agreed a £500,000 capital programme to improve the quantity and
quality of footpaths across Argyll and Bute.  Responsible for approximately one
million square metres of footpaths, the programme will focus on improving access
for all abilities by dropping kerbs at crossing points. 
At the September Council meeting the Council agreed the Strategic Housing
Investment Plan (SHIP) which sets out plans for 750 housing units in the coming
years including 247 homes this year.

Page 10

10 
In August the Council’s Policy and Resources Committee approved the programme
submission to the UK Government with regards to the UK Shared Prosperity Fund.
This fund is the successor to the EU Structural Fund.  
Argyll and Bute’s allocation is £4.5m. All local authorities are required to submit a
plan indicating how the funds will be invested and sets out for each priority
interventions, outputs and outcomes.  
Argyll and Bute’s plan is aligned to the three priorities – 
a) Communities and place 
b) Supporting local business 
c) People and skills
4.13 Environment
Argyll and Bute Council has reduced its carbon emissions for the fourth year in a
row and by a third since 2015/16. This is as a result of a range of measures including
making buildings more energy and heat efficient, the street lighting LED scheme,
electric and hybrid vehicles and recycling municipal waste.   
As part of Argyll and Bute’s Community Planning Partnership the Council has
allocated £50,000 to part-fund a new post. The new Climate Action Project Manager
will have responsibility for formulating a new Climate Action Plan with a strong focus
on community involvement.   
The Council received over £2m from the Scottish Government’s Energy Efficient
Programme. This funding is for means tested grants of between £8,000 and £21,100
per household.  
In July the Council appointed a principal contractor to deliver the Campbeltown Flood
Protection Scheme. This is part of a £15m scheme to reduce the risk of flooding in
the town including new pipelines to separate surface and sewer drainage, a new
‘storage dam’ facility, a large culvert and underground storage areas.  Some homes
and businesses will benefit from mitigations including the removal of flood protection
barriers on doors, automatically closing airbricks and small pump systems.  
4.14 Housing
The Council agreed to an additional £90,000 of funding (on top of £72,000 previously
awarded) for six affordable houses on the Isle of Ulva. These will be delivered by the
North West Mull Community Woodland Company who purchased the island via the
Community Right-to-Buy initiative in 2018.  
In response to the growing challenge with regards to the provision of housing, a
housing group led by Executive Director, Kirsty Flanagan has been established.
Together with Heads of Service and Senior Officers the group will identify solutions
and actions to address housing market issues across all sectors, not just the Council.

Page 11

11 
It will also consider how to remove any barriers to developing additional housing
across the area. 
4.15 Cost Of Living 
In September the Council agreed to lobby Government and create a Short Life
Working Group to alleviate the particular impacts of the cost of living/fuel cost crisis
faced by our communities.   
Argyll and Bute has -
 The highest number of inhabited islands of all Scottish Local Authorities
 Highest percentage of people living in Remote Rural Areas of all mainland
Councils.
 Third lowest median pay rate (gross) of all Scottish Local Authorities.
 Ranked most vulnerable to post Covid economic shock.
 Additional costs of living in our communities range from 13% to 185% above
costs in urban UK areas.
 Nearly 70% of all households are at risk of fuel poverty or of extreme fuel
poverty.
The Council calls on Governments to -
 Urgently provide information on funding for people who do not get their
energy through typical means, 50% of our households are non-gas compared
to 14% of all Scottish properties.
 Apply price caps to oil, LPG and solid fuel to ensure all households are given
the support they need to heat their homes.
 Remove the variable standing charge rate that compounds the already higher
costs for households in remote and rural areas.  This must be changed to a
uniform charge.
 Deliver equity in support for the cost of living and fuel cost crisis by making
sure that the support measures are pivoted to take account of the additional
costs incurred with remote, rural and island living. 
The following is a link to the report that went to Council on 29 September 2022 Link
to Council document - Cost of living_argyll-bute.gov.uk) with further details on this
item. 
4.16 Care
The Council agreed to take the extraordinary step to take the legal responsibility for
the Kintyre Care Centre, a 40 bedroom private sector care home in Campbeltown.
The Kintyre Care Centre provides the only nursing care provision in Campbeltown
and the west of Argyll.  The care centre was due to be closed by the owner HC-One

Page 12

12 
for commercial reasons. The Integrated Joint Board of the HSCP considered that it
was critically important to try to prevent the closure of the remaining care centre in
the area and agreement was reached. The HSCP cannot legally own buildings as it
is a partnership between the Council and NHS Highland.
Other Activities
4.17 Performance Management Project 
Data Challenge 
Following on from previous updates the Council is continuing on the highly
ambitious initiative to establish a ‘data platform’. The ‘data platform’ will collect
data from various systems and over time will enable the data to be accessed
and explored in a dashboard format. 
A Data Advisory Group consisting of senior officers from across the organisation
(both Council and HSCP) has been set up and is accountable to the Executive
Leadership Team (ELT).   
We aim to harness our data to ensure an evidence led approach to performance
management, service design, policy development, strategies and other decisions
that impacts on outcomes for our communities and stakeholders. 
Option Appraisals have been developed and presented to ELT with the decision
to use current ‘on site’ technology as the best option. This will allow the
opportunity to scale-up accordingly as the ‘data platform’ matures. Alongside this
a number of Data Challenges have been identified. One such challenge is to
explore how we can identify, and therefore support, children that are entitled to
financial support. 
This internal initiative has and will maintain close links with the Scottish Local
Government Digital Office data initiative and links to an action within the
Council’s Best Value Improvement Action Plan. 
Change Programme - Service Design 
After completing Phase 1 of the Performance Excellence Project to review
performance at Corporate Level, ELT agreed that Services will undertake a
review of Performance as part of the Service Design activity. The project team
will provide guidance and support to Services and are currently considering
approaches to this significant activity. A proposal will be presented to the ELT in
due course. 
4.18 PIF Activity 
As of this financial year the delivery of our Corporate Outcomes will be

Page 13

13 
monitored through a suite of 47 Indicators that have been identified. These are
known as Corporate Outcome Indicators (COIs). 
A Council-wide Business Plan will be developed during 2022/23 which will align
to our Corporate Plan, and the renewed Argyll and Bute Outcome Improvement
Plan (ABOIP). This will replace the previous Service Plans which were not
renewed for 2022/23. 
The 6-monthly ASC report will continue to present performance on cross-cutting
strategic themes such as Absence, Complaints and Risks. Additional information
relating to strategic activity will also be reported. 
This agreed process feeds into the Performance Management Project which
commenced in September 2020. 
5.0 CONCLUSION 
This report updates the Audit and Scrutiny Committee on how we are delivering our
outcomes; the key challenges and how we plan to manage them; other Strategic
activity along with implemented and planned changes to the PIF.   
6.0 IMPLICATIONS
6.1 Policy: None
6.2 Financial: None
6.3  Legal: None
6.4  HR: None
6.5  Fairer Scotland Duty: None
6.5.1   Equalities - protected characteristics: None
6.5.2   Socio-economic Duty: None
6.5.3  Islands: None
6.6 Climate Change: None
6.7 Risk: This report sets out key challenges to the organisation and actions in
response to these.
6.8 Customer Service: None                 
For further information contact: 
 Stuart Green, Corporate Support Manager
stuart.green@argyll-bute.gov.uk 
 Sonya Thomas, Performance and Improvement Officer

Page 14

14 
sonya.thomas@argyll-bute.gov.uk 
APPENDICES 
Appendix 1 - Suite of 47 Corporate Outcome Indicators 
Pippa Milne, Chief Executive – Argyll and Bute Council 
03 November 2022