Page 1

Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD
8 March 2023 
NOTICE OF MEETING 
A meeting of the AUDIT AND SCRUTINY COMMITTEE will be held BY MICROSOFT TEAMS on
THURSDAY, 16 MARCH 2023 at 11:00 AM, which you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES 
2. DECLARATIONS OF INTEREST 
3. MINUTE OF PREVIOUS MEETING OF THE AUDIT AND SCRUTINY COMMITTEE
HELD ON 20 DECEMBER 2022 (Pages 5 - 8) 
AUDIT ITEMS 
4. INTERNAL AUDIT AND COUNTER FRAUD SUMMARY OF ACTIVITIES (Pages 9 -
16)  
Report by Chief Internal Auditor 
5. INTERNAL AND EXTERNAL AUDIT REPORT FOLLOW UP 2022-23 (Pages 17 -
28)  
Report by Chief Internal Auditor 
6. INTERNAL AUDIT - EXTERNAL QUALITY ASSESSMENT (Pages 29 - 48)  
Report by Chief Internal Auditor 
SCRUTINY ITEMS 
7. VERBAL UPDATE BY CHAIR(S) OF THE SCRUTINY PANEL(S) 
Verbal update by Martin Caldwell and Councillor Jim Lynch 
8. 2023/24 INTERNAL AUDIT PLAN (Pages 49 - 74)  
Report by Chief Internal Auditor 
9. EXTERNAL AUDIT - 2022/23 ANNUAL PLAN 
Verbal Update by Mazars
Public Document Pack

Page 2

10. UNAUDITED ANNUAL ACCOUNTS 2022-23 (Pages 75 - 114)  
Report by Head of Financial Services 
11. TREASURY MANAGEMENT STRATEGY STATEMENT AND ANNUAL
INVESTMENT STRATEGY (Pages 115 - 170)  
Report by Head of Financial Services 
12. BEST VALUE IMPROVEMENT ACTION PLAN UPDATE (Pages 171 - 186)  
Report by Chief Executive 
13. INTERNAL AUDIT CHARTER AND INTERNAL AUDIT MANUAL (Pages 187 - 212)  
Report by Chief Internal Auditor 
14. SCRUTINY FRAMEWORK AND MANUAL ANNUAL REVIEW (Pages 213 - 236)  
Report by Chief Internal Auditor 
15. REGULATION OF INVESTIGATORY POWERS (SCOTLAND) ACT 2000 (RIPSA)
ANNUAL REPORT (Pages 237 - 238)  
Report by Executive Director with responsibility for Legal and Regulatory Support 
16. WORKPLAN (Pages 239 - 242)  
For noting and updating 
17. INTERNAL AUDIT REPORTS TO AUDIT AND SCRUTINY COMMITTEE 2022/23 
(a) Covering Report and Internal Audit Reports (Pages 243 - 284)   
Report by Chief Internal Auditor 
 Live Argyll – Events Management
 Procurement
 Customer Service Centre 
E1  (b) Internal Audit Report (Pages 285 - 300)   
 Client Funds 
The Committee will be asked to pass a resolution in terms of Section 50(A)(4) of the Local
Government (Scotland) Act 1973 to exclude the public for items of business with an “E” on the
grounds that it is likely to involve the disclosure of exempt information as defined in the
appropriate paragraphs of Part 1 of Schedule 7a to the Local Government (Scotland) Act 1973. 
The appropriate paragraphs are:- 
E1 
Paragraph 6 
Information relating to the financial or business affairs of any particular person (other than the
authority).
.

Page 3

Audit and Scrutiny Committee 
Martin Caldwell (Chair) Councillor Daniel Hampsey
Councillor Graham Hardie Councillor Mark Irvine
Councillor Reeni Kennedy-Boyle Councillor Jim Lynch (Vice-Chair)
Councillor Andrew Vennard   
Shona Barton, Governance Manager 
Contact: Lynsey Innis, Senior Committee Assistant, Tel:  01546 604338

Page 4

This page is intentionally left blank

Page 5

MINUTES of MEETING of AUDIT AND SCRUTINY COMMITTEE held BY MICROSOFT TEAMS 
on TUESDAY, 20 DECEMBER 2022 
Present: Martin Caldwell (Chair) 
Councillor Daniel Hampsey
Councillor Graham Hardie
Councillor Mark Irvine 
Councillor Reeni Kennedy-Boyle
Councillor Jim Lynch
Councillor Andrew Vennard 
Attending: Jane Fowler, Head of Customer Support Services
Paul MacAskill, Chief Internal Auditor
Shona Barton, Governance Manager
Mhairi Weldon, Senior Audit Assistant 
1. APOLOGIES 
The Chair welcomed everyone to the meeting. 
There were no apologies for absence intimated.   
2. DECLARATIONS OF INTEREST 
Councillor Jim Lynch noted in relation to agenda item 5 (Internal and External Audit
Report Follow Up 2022-23) that he was appointed to the Oban BID Board by the Council. 
Having taken note of the updated Standards Commission Guidance in relation to
declarations (issued on 7 December 2021) with specific reference to 5.4(c) he did not
consider that he had a relevant connection and as such would remain in the meeting and
take part in consideration of the item. 
3. MINUTES 
(a) Minute of previous meeting held on 15 September 2022 
The Minute of the previous meeting of the Audit and Scrutiny Committee, held on 15
September 2022 was approved as a correct record. 
(b) Minute of the Special Meeting held on 22 November 2022 
The Minute of the Special meeting of the Audit and Scrutiny Committee, held on 22
November 2022 was approved as a correct record.   
4. INTERNAL AUDIT AND COUNTER FRAUD SUMMARY OF ACTIVITIES 
The Committee gave consideration to a report providing a summary of Internal Audit
activity and progress during quarter 3 of 2022/23 against the following areas: 
Audits Completed 
 Performance Management (HSCP) 
 Directions (HSCP)
Page 5 Agenda Item 3

Page 6

 Commissioning (HSCP)
 Heritage Assets
 Externally Funded Projects
 Early Years – Covid Funding
 Private Sector Grants and Housing Adaptations
 Oban Airport
 Campbeltown Aqualibrium 
Audits in Progress 
 Procurement
 Events Management
 Management of Debt and Debt Recovery
 Client Funds 
The report also included information on the work carried out by the Counter Fraud Team
(CFT) and provided an update on the work being undertaken by the CFT which feeds into
the National Fraud Initiative (NFI) matching service.     
Decision 
The Audit and Scrutiny Committee agreed to note and endorse the Summary of Activities
report. 
(Reference:  Report by Chief Internal Auditor, dated 20 December 2022, submitted) 
5. INTERNAL AND EXTERNAL AUDIT REPORT FOLLOW UP 2022-23 
The Committee gave consideration to a report providing an update on all open actions as
at 30 September 2022, including information on actions where the agreed implementation
date had been rescheduled.   
Decision 
The Audit and Scrutiny Committee agreed to endorse the contents of the report. 
(Reference:  Report by Chief Internal Auditor, dated 20 December 2022, submitted) 
6. INTERNAL AUDIT REPORTS TO AUDIT AND SCRUTINY COMMITTEE 2022/23 
The Committee gave consideration to a report containing the action plans in relation to the
following 9 audits:- 
 Externally Funded Projects
 Heritage Assets
 Early Years
 Private Sector Grants and Housing Adaptations
 Oban Airport
 Live Argyll – Campbeltown Aqualibrium
 Performance Management (HSCP)
 Directions (HSCP)
 Commissioning (HSCP)
Page 6

Page 7

Decision 
The Audit and Scrutiny Committee agreed to note and endorse the summary report and
detail within each individual report.   
(Reference:  Report by Chief Internal Auditor, dated 20 December 2022, submitted) 
Councillor Andrew Vennard joined the meeting during discussion of agenda item 7 (Verbal
Update by Chair(s) of the Scrutiny Panel(s))
.
7. VERBAL UPDATE BY CHAIR(S) OF THE SCRUTINY PANEL(S) 
Martin Caldwell, Chair of the Public Consultation Review Panel provided a short update in
relation to the progress made since the review commenced.  He advised that a meeting
had been arranged with the Chief Internal Auditor for the New Year to discuss how best to
define the scope of the review and that a further update would be provided to the next
meeting of the Committee.   
Councillor Jim Lynch, Chair of the Fly Tipping Review Panel provided a short update in
relation to the progress made since the last meeting.  He advised of the difficulties of
defining fly tipping and in particular the issues that have presented in seeking information
to allow for a fair review to be conducted.  Councillor Lynch advised of the next steps in
seeking information and that he hoped to be in a position to provide an update to the next
meeting of the Committee.   
8. COUNCIL 6-MONTH PERFORMANCE REPORT - APRIL TO SEPTEMBER 2022 
Consideration was given to a report which presented the Council’s 6-month Performance
Report for April to September 2022. 
Decision 
The Audit and Scrutiny Committee:- 
1. noted that the report presented the Council performance on strategic activities across
all services; 
2. reviewed and scrutinised the Council’s 6-month Performance Report; 
3. noted that the Strategic and Area Committees have responsibility to scrutinise
operational performance; and 
4. noted the planned activity for Performance Management and Reporting during 2022/23
onwards.   
(Reference:  Report by Executive Director with responsibility for Customer Support
Services, dated 20 December 2022, submitted) 
9. WORKPLAN 
Page 7

Page 8

In order to facilitate forward planning of reports to the Audit and Scrutiny Committee,
Members considered the outline Audit and Scrutiny Committee workplan. 
Decision 
The Audit and Scrutiny Committee agreed to note the outline workplan. 
(Reference:  Audit and Scrutiny Committee Workplan, dated 20 December 2022,
submitted) 
Page 8

Page 9

ARGYLL AND BUTE COUNCIL  AUDIT & SCRUTINY COMMITTEE   
FINANCIAL SERVICES  16 MARCH 2023  
INTERNAL AUDIT  AND COUNTER FRAUD SUMMARY OF ACTIVITIES 
1. SUMMARY  
1.1 The objective of the report is to provide the Audit and Scrutiny Committee (the
Committee) with a summary of Internal Audit activity and progress during quarter
four of 2022/23.  
1.2 Core activities together with a progress update statement are shown below: 
 2022/23 Audit Plan progress: On track subject to available resources being in
place for the full period of the approved plan and that one review is postponed
until 2023-24 for organisational reasons and the second review relating to car
parking is not now required as a departmental review has been undertaken. 
 Individual Audits undertaken: Four audits have been completed during the
period. Three audits have been assessed as providing high assurance, none as
substantial assurance, none reasonable assurance and one as limited
assurance. (Where HSCP Audits are included these are provided for
information only). 
 Counter Fraud: The Counter Fraud Team (CFT) is continuing to rebill council
tax accounts and recovery of funds is underway.  All other aspects and referrals
are being considered, investigated and evaluated and the Counter Fraud Team
remain vigilant to protect our public purse. 
 Continuous Monitoring Programme Testing: A number of auditable units are
subject to continuous testing. No new issues have been identified this quarter
and management have responded to previous quarter notifications. 
 Performance indicators: Current status is green / on track. 
2. RECOMMENDATIONS  
2.1 To review and endorse the Summary of Activities report.  
3. DETAIL  
3.1 Four audits have been completed since the previous Committee in December
2022. One audit is currently in progress and will be to follow. 
Audits Completed 
 Procurement
 Events Management
 Client Funds
Page 9 Agenda Item 4

Page 10

 Customer Service Centre   
Audits in Planning / in Progress
reported to a future meeting of the Committee 
 Purchasing Cards
 Building Standards
 Cyber Security
 Management of Debt & Debt Recovery
 Burial Records
 Counselling in Schools
 Equality and Socio-Economic Impact Assessment
 Payroll  
3.2 In addition to those already in progress indicative audits planned for Quarter 4
2022/23 are:  
3.3 2022/23 Audit Plan 
 No further outstanding items to be progress on the amended plan.  
3.4 The audit of Learning and Physical Disability Care Packages has been postponed
until April 2023, this review will be now cover a much wider remit and include
governance and management and will be included in the 2023-24 internal audit
plan. This approach has been deemed appropriate by the relevant service and
internal audit. In addition, it was deemed that due to an internal review of parking
this would not require to be covered by internal audit. These remain the
amendments to the original plan approved by the Committee.   
Scrutiny  
3.5 Scrutiny topics agreed for the 2022/23 plan were consultations and a follow-up
review of Fly Tipping.  A Terms of Reference has been produced for the
Consultations review and a team identified, two meetings have taken place and
attended by senior officers supporting the Panel. This report will be submitted to a
future meeting of the Committee once it has been completed.  Progress and follow
up work on the ‘Fly Tipping’ review has been postponed until data becomes
available to the Panel. It is now likely that this will be in the summer of 2023 but we
will keep the Panel updated so this can commence as soon as possible.     
Counter Fraud  
3.6 The CFT is progressing well with both team members fully CIPFA accredited fraud
investigators. Continued routine work is required to be able to accurately track the
full income recovered from the team’s work, however, based on the amount of
additional billing, even accounting for a degree of non-recovery, the indications are
that they are easily exceeding target. In addition they are raising awareness of the
Council’s zero tolerance to fraud and this will act as a deterrent to fraud being
perpetrated in the first place. The team have recently visited Oban which has
resulted in the rebilling of a number of accounts.  A revisit to Bute and Dunoon is
due within February and work is planned in other areas which include Helensburgh
and the Islands early in the new financial year.
Page 10

Page 11

The new NFI exercise for 2022/23 has just been released after some technical
delays from Cabinet Office.  This exercise will be conducted throughout the year by
officers and matches checked and closed accordingly.  
3.7 The CFT are reviewing the information received from the National Fraud Initiative
(NFI) matching service, work has commenced to follow these up locally.   
Additional Updates from Quarter Three  
3.8 Staff continue to work from home and this has proved to be successful; where on-
site visits have been required due to the specific nature of the audit work to be
undertaken, these visits have occurred in accordance with any guidance that was
in place.  
3.9 The Public Sector Internal Audit Standards (PSIAS) require the Council’s Chief
Internal Auditor (CIA) to develop a Quality Assurance and Improvement
Programme (QAIP). The purpose of the QAIP is to enable the evaluation of
internal audit’s conformance to the PSIAS. The QAIP must include annual
internal self-assessments with a five yearly external assessment, carried out by
an independent assessor.  A programme of five yearly reviews has been
prepared by the Scottish Local Authorities Chief Internal Auditors Group
(SLACIAG) and these will be conducted by peer review, Argyll and Bute Council
has been scheduled for review in September 2022 by East Dunbartonshire
Council.  This review has now been completed and a report forms part of the
March papers to the Committee.     
Continuous Monitoring  
3.10 Our continuous monitoring programme is generally focused on transactional type
activity. Standard audit tests are applied which are relevant to each auditable unit.
Control design tests look at whether the controls in place adequately address the
potential risk event. There have been no new findings within the quarter that
require to be reported. 
Table 2: Continuous Monitoring Findings 
Auditable
Area
Areas Tested Issues Identified Management comment /
action  
None identified 
3.11 A follow up process is in place whereby management are advised of continuous
monitoring findings and, where appropriate, requested to take remedial action. 
There are currently no outstanding follow-up points arising from previous testing. 
Due to the volume of continuous monitoring tests carried out the decision was
made to report by exception only.     
National Reports  
3.12 A follow up process for national reports is in place whereby management are
advised of national reports published and asked to confirm what, if any, action is
Page 11

Page 12

planned as a result of the report.  Table 2 details the national reports issued during
quarter four 2022/23.  
Table 3: National Reports 
National
Report
Issued
To
Detail Management response/ Action
taken
No new
reports   
National Fraud Initiative (NFI)  
3.13 NFI data matching involves comparing computer records held by one body against
other computer records held by the same or another body to identify potentially
fraudulent claims and payments to be identified.  Note though that the inclusion of
personal data within a data matching exercise does not mean that any specific
individual is under suspicion. Where a match is found it indicates that there may be
an inconsistency which requires further investigation. No assumption can be made
as to whether there is fraud, error or other explanation until an investigation is
carried out.  A reminder process is in place to ensure that matches are reviewed
on a timely basis.  
3.14 All required datasets for the 2022-23 exercise have now been uploaded to the NFI
application and some matches were released for review on 29 January 2023 –
there was a delay in Cabinet Office releasing all the data.  Existing users have
been reviewed and new users added where requested, all users have been
informed that matches are available for review and progress will be monitored
monthly by the Counter Fraud team and reported quarterly to the Audit and
Scrutiny Committee.  As of 17 February, most of the NFI exercise data has now
been released, and initial work has started.   
Table 4: National Fraud Initiative Progress at 12/02/2023 
Operation
al Area
Total
Matches
Recommende
d/Very High /
High Risk
Matches
Matches
Complete 
WIP Match Description
CT to Elect
Register 
1155 0 1155 0 CT records to Electoral Register/
other data sets to ensure discount
awarded to only those living alone
aged over 18, taking into account
disregarded occupants.  (CT to
other Datasets will not be
progressed further due to poor
quality data)
CT rising
18s 
208 0 208 0
Housing
Benefits
11 5 0 0 HB records to records in other
authorities / other datasets
including student loans, payroll
and pensions to identify
undeclared income and capital.
Payroll 141 0 0 0 Payroll records to other datasets
including other payrolls and
Page 12

Page 13

pensions to ensure employee is
not receiving additional income.
Blue
Badges
238 204 0 0 Blue badge records to DWP data
to identify deceased claimant with
valid badge.
Housing
Waiting list
200 182 0 0 Housing waiting list records to
other organisations HBCTR and
tenant data to identify
undisclosed changes in circs or
false info.
Council
Tax
Reduction
259 138 0 0 CTR records with records in other
authorities / other datasets
including; student loans, payroll
and pensions to identify
undeclared income and capital
Creditors 589 0 0 0 Analyses Creditors data to
identify possible duplicate
vendors and payments, VAT
errors or fraud and multiple
vendors sharing a bank account.
Procureme
nt
38 0 0 0 Payroll records to Companies
House and creditors data to
identify employees who appear to
have a personal interest in a
company that the authority has
traded with. 
Overall Summary of Matches 
Matches
Complete
Work In
Progress
Cleared Frauds Errors Total
Value 
£
Recovering Recovering
Value 
£ 
1,363 0 1,363 0 0 0 0 0 
Internal Audit Development  
3.15 The table below details progress against the action points in our Internal Audit
development plan.  
Table 5: Internal Audit Development Key Actions: 
Area For
Improvement
Agreed Action Progress
Update
Timescale
Clearer referencing of
findings referred to in
the Annual Audit
Report and that within
the Annual
Governance
Statement (AGS) and
Vice Versa
Once the AGS has been reviewed,
work will then commence on updating
the Internal Audit Annual Report so
that clearer referencing can be
accommodated between both
documents for ease of use.
Work
commenced on
the review of
the  AGS
August
2023
Create SharePoint list
to track audit actions.
Information recorded on the Access
DB will be transferred to a new
SharePoint list allowing officers to
update progress themselves.  New
actions will be added to this list when
audit reports are published.
Complete March 2023
Page 13

Page 14

Review Continuous
Monitoring
Programme
Continuous monitoring tests will be
reviewed following audit of Debt
recovery to assess value of existing
tests carried out. 
Consider adding test to review date
taken to process invoices from date of
receipt within the Council (not at
Creditors)
In progress June 2023
Update format of
template for quarterly
reporting of progress
in implementing audit
actions.
Data extracted from the new
SharePoint list will be exported to
Excel and manipulated into a format
that can be copied to the cover report
template on word.  
Template and
formulae
updated, these
will be tested
Q1 2023
report.
June 2023 
3.16 Internal Audit scorecard data is available on pyramid. The indicators reported are
aligned to those for internal audit in the Financial Services service plan.  All
indicators are shown as currently being on track.  
Table 6: Internal Audit Team Scorecard  
Internal Audit Team Scorecard 2022– 23 – FQ3 22/23 (as at December 2022)
BO115 We Are Efficient And Cost Effective    
Internal Audit Level of Satisfaction
Actual  95% G 
Target 80%
Review of Strategic Risk register
Status On Track G 
Target On Track
Percentage of audit plan completed
Status 100% G 
Target 100%
Percentage of audit recommendations accepted by
management
Actual  100% G 
Target 100% 
4 CONCLUSION  
4.1 The 2022/23 audit plan is on track and the Counter Fraud Team is continuing with
visits and pro-active work throughout Argyll and Bute.  
5 IMPLICATIONS
5.1 Policy - Internal Audit continues to adopt a risk based approach to activity
5.2 Financial –None
5.3 Legal –None
5.4 HR – None
5.5 Fairer Scotland Duty – None
5.5.1 Equalities – None
5.5.2 Socio-Economic Duty – None
Page 14

Page 15

5.5.3 Islands Duty – None
5.6 Climate Change – None 
5.7 Risk – None
5.8 Customer Service – None 
For further information please contact Internal Audit (01546 604108)
Paul Macaskill
Chief Internal Auditor
16 March 2023
Page 15

Page 16

This page is intentionally left blank

Page 17

ARGYLL AND BUTE COUNCIL  AUDIT AND SCRUTINY COMMITTEE                                                            
FINANCIAL SERVICES  16 March 2023 
INTERNAL AND EXTERNAL AUDIT REPORT FOLLOW UP 2022-23 
1.0 INTRODUCTION 
1.1 Internal and external audit reports include an action plan with a
management response establishing the agreed action, timescale and
responsible officer. Internal Audit record these in SharePoint and, on a
monthly basis, follow them up to ensure they are being progressed. 
1.2 This report updates the committee on all open actions as at 31 December
2022 including information on actions where the agreed implementation
date has been rescheduled.   
2.0 RECOMMENDATIONS 
2.1 To endorse the contents of the report. 
3.0 DETAIL 
3.1 The two tables below provide a numerical summary of open audit actions
with a split between actions due by and due after 31 December 2022. 
3.2 Appendix 1 provides further detail on actions that have either been delayed
and rescheduled or for which Internal Audit have received no response
from the service to inform this follow up. 
Page 17 Agenda Item 5

Page 18

Table 1 - Actions Due by 31 December 2022 
Table 2 - Actions due after 31 December 2022
Service
Complete
On Course
Delayed
&
Rescheduled
Total
INTERNAL AUDIT
CE – Financial Services   0 5 1 6
H&SCP (SW) – Adult Services (Mental Health Learning
Disability, Addictions & Lifelong Conditions)
1 0 0 1
DH – Commercial Services 0 4 0 4
DH – Learning & Teaching 0 2 0 2
DH – Legal & Regulatory 0 3 0 3
DH – Lifelong Learning & Support 0 0 1 1
KF – Customer Support Services 0 1 0 1
KF – Development & Economic Growth 0 3 0 3
KF – Roads & Infrastructure Services 0 0 1 1
H&SCP (IJB) – Adult Services (Older Adults & Community
Hospitals)
0 3 0 3
H&SCP (IJB) – Strategic Planning & Performance 0 5 0 5
LiveArgyll 0 1 0 1
EXTERNAL AUDIT
Nil    
TOTAL 1 27 3 31 
Service
Complete
Delayed
&
Rescheduled
Total
INTERNAL AUDIT
CE – Financial Services   1 1 2
DH – Commercial Services 0 1 1
DH – Learning & Teaching 1 0 1
DH – Legal & Regulatory 1 3 4
KF – Customer Support Services 1 0 1
KF – Development & Economic Growth 0 1 1
KF – Roads & Infrastructure Services 1 6 7
H&SCP (IJB) – Adult Services (Older Adults & Community Hospitals) 0 1 1
H&SCP (IJB) – Finance & Transformation 0 1 1
H&SCP (SW) – Adult Services (Mental Health Learning Disability,
Addictions & Lifelong Conditions)
0 1 1
EXTERNAL AUDIT   
Nil   
TOTAL 5 15 20
Page 18

Page 19

4.0 CONCLUSION 
4.1 Satisfactory progress continues to be made implementing audit actions …. 
5.0 IMPLICATIONS 
5.1 Policy - None
5.2 Financial - None
5.3 Legal - None
5.4 HR - None
5.5 Fairer Scotland Duty - None
5.5.1 Equalities – None
5.5.2 Socio-Economic Duty – None
5.5.3 Islands Duty - None
5.6 Risk –None 
5.7 Customer Service – None 
Paul MacAskill
Chief Internal Auditor
16 March 2023                                                  
For further information contact: Paul MacAskill, 01546 604108
Paul.macaskill@argyll-bute.gov.uk 
APPENDICES
Appendix 1 – Action Plan Points Delayed & Rescheduled or with No Response
Page 19

Page 20

Appendix 1 - Action Plan Points Delayed & Rescheduled or with No Response 
Action Plan Points Due by 31 December 2022
Finding & Priority Agreed Action Dates Comment / Status Responsible Officer 
FINANCIAL SERVICES - SYSTEMS INTERFACES & RECONCILIATIONS
General Ledger Reconciliations  
There is no reconciliation performed
between the source system and the
general ledger for ResourceLink, PECOS,
Concerto and Tranman and the SEEMiS
interface for clothing grants. 
Medium
Reconciliations will be performed
following consideration of data and
technical requirements. 
31 Mar 2021
31 Dec 2021 
30 Jun 2022
30 Sep 2022
31 Oct 2022
28 Feb 2023 
Senior Accountant is liaising
with the systems
administrator for Resource
Link and continuing to try and
find a solution using cognos.
We hope to conclude this by
end of February 2023. 
Delayed and Rescheduled 
Resourcelink -
Pensions & Payroll
Officer 
COMMERCIAL SERVICES - SYSTEMS INTERFACES & RECONCILIATIONS
General Ledger Reconciliations There is
no reconciliation performed between the
source system and the general ledger for
ResourceLink, PECOS, Concerto and
Tranman and the SEEMiS interface for
clothing grants. 
Medium
Data in the source system may not
be accurately reflected in the general
ledger. 
31 Mar 2021 
30 Sep 2021 
31 Dec 2021 
30 Jun 2022 
31 Dec 2022
31 Mar 2023 
Meeting arranged to bring
action to a close, expected to
complete during January
2023. 
Delayed and Rescheduled 
Concerto - Property
Design Manager 
LEGAL & REGULATORY SUPPORT - INFORMATION ASSET REGISTERS
Information Asset Registers 
The two Social Work IARs were not
available for review or located on the
designated sharepoint site. Of the
remaining ten, four require to be updated
to reflect the latest GDPR requirements. 
Clarity over whether the Live Argyll IAR
comes under the remit of the Governance,
Risk & Safety Manager’s responsibility is
required.
High
Social Work IARs to be completed
and approved by appropriate
management teams 
31 Dec 2020 
30 Jun 2021
30 Sep 2021
31 Dec 2021 
30 Jun 2022
31 Dec 2022
30 Jun 2023 
IAR development work in
progress with information
management consultants -
new format and reporting
route to be agreed. 
Delayed and Rescheduled 
Governance, Risk &
Safety Manager 
Page 20

Page 21

Action Plan Points Due by 31 December 2022
Finding & Priority Agreed Action Dates Comment / Status Responsible Officer 
Periodic Review and Agreement of
Information Asset Registers 
For four of the 12 IARs there was no
evidence they had been agreed by the
relevant DMT. Furthermore IARs need to
be reviewed to ensure they are aligned to
the new Corporate structure. The RMP
requires that IAR’s should have a
complete action plan to document required
changes. Two of the 12 IARs had an
action plan, two had action plans that did
not fully meet the requirements of the
RMP and eight had no action plan. 
Medium
Obtain annual approval from DMTs
for all completed IARs 
30 Sep 2020
31 Mar 2021
30 Sep 2021
31 Dec 2021 
30 Jun 2022 
31 Dec 2022
30 Jun 2023 
IAR development work in
progress with information
management consultants -
new format and reporting
route to be agreed. 
Delayed and Rescheduled 
Governance, Risk &
Safety Manager 
Periodic Review and Agreement of
Information Asset Registers 
For four of the 12 IARs there was no
evidence they had been agreed by the
relevant DMT. Furthermore IARs need to
be reviewed to ensure they are aligned to
the new Corporate structure. 
The RMP requires that IAR’s should have
a complete action plan to document
required changes. Two of the 12 IARs had
an action plan, two had action plans that
did not fully meet the requirements of the
RMP and eight had no action plan. 
Medium 
Action plans for all IARs to be put in
place and agreed by management
teams 
30 Sep 2020
31 Mar 2021
30 Sep 2021
31 Dec 2021 
30 Jun 2022
31 Dec 2022
30 Jun 2023 
IAR development work in
progress with information
management consultants -
new format and reporting
route to be agreed. 
Delayed and Rescheduled 
Governance, Risk &
Safety Manager 
Page 21

Page 22

Action Plan Points Due by 31 December 2022
Finding & Priority Agreed Action Dates Comment / Status Responsible Officer 
DEVELOPMENT & ECONOMIC GROWTH - Planning Applications
Procedure Document There are no
established written procedural documents
in  place, staff follow a series of workflow
processes which  are aligned to legislative
requirements and current guidance. 
High
Review and update of existing
written procedures to provide a
collated procedural document for the
handling of planning applications. 
31 Dec 2022
30 Jun 2023 
Staff availability to progress
this has been limited -
extension to Summer 2023
agreed. 
Delayed and Rescheduled 
Process and
Productivity 
Improvement Officer 
ROADS & INFRASTRUCTURE SERVICES - FLEET MANAGEMENT
Management of Pool Cars A high level
analysis of the use of pool cars suggests
the Council could generate considerable
savings through more efficient use of pool
cars. Fleet Services should explore this
further via a more detailed review which
should consider the potential benefits of: ·
a more centralised approach to the
administration and booking of pool cars 
· better promotion of the use of pool cars 
· providing greater visibility of bookings
and destinations to encourage pool car
sharing 
· implementing or developing a pool car
booking system 
· identifying ways of transferring the
balance of pool car usage from shorter
journeys to longer ones 
VFM 
The pool car module will be released
through Tranman. The pool car
module offers a centralised
approach to bookings and visibility.
The Council’s internal
communications department will be
contacted to highlight the use of the
pool cars. Work will be undertaken to
increase usage. 
30 Sep 2020
31 Dec 2020 
30 Jun 2021
31 Dec 2021 
30 Apr 2022
29 Jul 2022
30 Sep 2022 
31 Dec 2022
30 Apr 2023 
The system is currently being
tested, however, errors have
been identified. Once the
errors are resolved, the
system will operate alongside
the current system to ensure
that all errors and fault codes
are cleared, with a view to a
full changeover from the
current system to the new
system and full
implementation on the 30th
April 2023. 
Delayed and Rescheduled 
Procurement/Technical
Officer 
Page 22

Page 23

Action Plan Points Due by 31 December 2022
Finding & Priority Agreed Action Dates Comment / Status Responsible Officer 
ROADS & INFRASTRUCTURE SERVICES - STREET CLEANING
Partnership Agreement 
Oban Business Improvement District (BID)
has agreed to fund an additional seasonal
street sweeper employed by the Council.
The street sweeper has been appointed
through the Council’s recruitment process,
however no formal agreement is in place
and income from BID has not been
received. 
High
Formalise arrangements with Oban
BID for the funding of the seasonal
street sweeper 
30 Apr 2022
30 Sep 2022
30 Dec 2022
31 Mar 2023 
The partnership continues to
work with the BIDS group
funding additional street
sweeping services in Oban. 
Discussions are ongoing with
colleagues in Legal Services
to establish a partnership
agreement. A draft
agreement has now been
written up for the forth
coming season.  This will be
signed off at the pre-season
meeting with BIDs and
operations personnel.  Draft
agreement provided. 
Delayed and Rescheduled 
Operations Manager,
Roads & Infrastructure
Services 
Updating of ELM 
Local Environment Teams (LETs) are not
currently using tablet devices to indicate
that work allocated has been completed.
Supervisors are updating the system in
some areas but this is not consistent
across the Council. 
Low
Reintroduce use of handheld
devices subject to ongoing Covid
restrictions etc. to allow efficient
updates to ELM. 
31 Jul 2022
30 Dec 2022
31 Mar 2023 
We are experiencing some
hardware problems and
access issues.  Refresher
training has been arranged
and will take place during the
month of October.
Unfortunately due to staff
sicknesses and annual leave
this training has not yet taken
place, however the training
has been re-arranged for
February 2023 to ensure
everyone is fully re-trained
ahead of the forthcoming
season in April. 
Delayed and Rescheduled 
Operations Manager,
Roads & Infrastructure
Services 
Page 23

Page 24

Action Plan Points Due by 31 December 2022
Finding & Priority Agreed Action Dates Comment / Status Responsible Officer 
Warden Service Coverage 
The four environmental wardens that are
expected to cover the whole of the Council
area, including the islands, are not
geographically spread to ensure there is
efficient cover across the four Council
administration areas. In particular, since
2018, there has been no warden based in
the MAKI area which has resulted in: 
· disproportionately low level of warden
service in MAKI compared to the other
administrative areas 
· where work is required in MAKI the
majority of the warden’s time is spent
commuting rather than delivering the
required services. 
High
Consider opportunities to either
restructure/ review overall service
delivery to provide additional warden
cover or alternatively look to
generate additional income to
facilitate additional FTEs and a more
equitable spread of resource. 
This will help inform any input into
the 2022 budget process. 
30 Jun 2022
31 Dec 2022
31 Mar 2023 
The gathering of information
and talks with Network &
Standards (N&S), colleagues
are ongoing with regards
combining the Car Parking
Wardens and Staycation
Wardens with the Amenity
Warden Service. 
Delayed and Rescheduled 
Operations Manager,
Roads & Infrastructure
Services 
Second Bin Service Verification 
Wardens are expected to verify the
veracity of applications from customers for
a second domestic bin service. This
requires the warden to confirm that
information provided by the customer is
accurate and meets the defined criteria.
The information provided to substantiate
an application can be very personal and
sometimes of a sensitive medical nature.
Wardens have been asked to provide this
service but have received no formal
training in how to ensure a customer’s
dignity is maintained or to ensure they are
aware of the requirements of General Data
Review the process for: 
· Dealing with requests for new and
replacement bins. 
30 Jun 2022
30 Sep 2022
31 Dec 2022
30 Jun 2023 
Discussions have taken place
with the Governance team
regarding the collation of
information and distribution
those applicants who have
medical needs will
automatically receive the
service.  The service are
looking to tie this into a new
proposed policy.  The waste
policy has to be prepared for
the EDI committee in June
2023. 
Delayed and Rescheduled 
Operations Manager,
Roads & Infrastructure
Services 
Page 24

Page 25

Action Plan Points Due by 31 December 2022
Finding & Priority Agreed Action Dates Comment / Status Responsible Officer 
Protection Regulation (GDPR) in relation
to personal data for this specific process. 
Due to the sensitivity of this process, and
the potential risks associated with data
protection it is recommended that the
current verification process is
reconsidered to determine if it is
appropriate to maintain it in its current
form. If it is decided it should be retained
then there should be engagement with the
Council’s Governance and Risk Manager
to ensure it is being carried out in full
compliance with GDPR. 
High
Review the process for: 
Review the second bins that are in
place and the process for
rationalising. This review to also give
consideration to composition and
identify opportunity to increase
recycling and reduce general waste. 
30 Sep 2022
30 Dec 2022
30 Jun 2023 
The roads and amenity
administration staff have
pulled together the
information in relation to bins
that have been approved. 
We are now in the process of
identifying those who have
received a bin for medical
needs these will be
eliminated from the future
assessment of those
applicants who will be invited
to re-apply.  This is in line
with the advice received from
the governance team.  The
service are also in the
process of drafting a new
waste policy to further
increase recycling and
reduce general waste. The
waste policy has to be
prepared for the EDI
committee in June 2023. 
Delayed and Rescheduled 
Operations Manager,
Roads & Infrastructure
Services 
ADULT SERVICES (OLDER ADULTS & COMMUNITY HOSPITALS)HSCP - CARE PROGRAMME APPROACH
Client Records 
There is no consistent agreed process for
maintaining client records, including the
recording and sharing of information. 
High 
HSCP expect to transition to new
Eclipse system. Implementation of
the new system and associated
processes and procedures will
address this recommendation and
the Data Officer will be involved in
the development of processes and
procedures. 
30 Jun 2022
30 Sep 2022
31 Mar 2023
30 Jun 2023 
A further delay is required as
the Eclipse project has been
delayed further. Roll out is
now anticipated to be
complete in May 2023. 
Delayed and Rescheduled 
Service Manager/
Eclipse Project
Manager 
Page 25

Page 26

Action Plan Points Due by 31 December 2022
Finding & Priority Agreed Action Dates Comment / Status Responsible Officer 
FINANCE/TRANSFORMATION H&SCP - Complaints Handling 
Training 
Training should be provided in the
complaints handling  procedures for the
IJB 
Low
Complaints Handling Training will be
incorporated into staff training
processes. 
30 Sep 2022
30 Nov 2022
30 Jun 2023 
This is now complete in
respect of council employees.
Within the NHS part of the
HSCP there is work
underway to review training
materials and training
programme.   
Delayed and Rescheduled 
Chief Nurse-NHS
Highland 
ADULT SERVICES (MENTAL HEALTH LEARNING DISABILITY, ADDICTIONS & LIFELONG CONDITIONS/CSWO)SW - CHARGING FOR NON-
RESIDENTIAL CARE SERVICES
Service Uptake
Data Records held on Carefirst do not
allow for an analysis of the level of service
uptake compared to those assessed as
having a need. If this analysis could be
performed it would help inform discussions
and decisions in relation to service uptake,
charges and barriers to uptake.  It would
be advisable to progress this issue in
conjunction with the CareFirst replacement
programme which is scheduled to be
complete by April 2022. 
VFM
Recommendation accepted. Further
discussion will be held with supplier
to include service uptake
functionality and reporting
capabilities on new system from
April 2022. 
31 Mar 2022
30 Sep 2022
31 Mar 2023
30 Jun 2023 
A further delay to the Eclipse
project has now been
reported - roll out is expected
to complete by end May
2023. 
Delayed and Rescheduled 
Deputy Head of
eHealth HSCP  Page 26

Page 27

Action Plan Points Due After 31 December 2022
Finding & Priority Agreed Action Dates Comment Responsible Officer /
Status
FINANCIAL SERVICES - CAPITAL MONITORING
Capital Programme Planning &
Management Guide The Council’s Capital
Guide has not been revised since 2018
and requires a review to ensure it reflects
current working practices and provides
appropriate support to officers involved in
the capital monitoring process. The
Council is currently developing a new
Capital Strategy which is to be presented
to the Policy and Resources Committee in
August 2021 and we recognise that a
review of the Guide should be conducted
after the Strategy has been finalised to
ensure the two documents complement
each other and. The Guide could also
benefit from being linked to, or
referencing, other relevant Council
processes, in particular the Project
Management section on the Hub. 
Medium
Capital Planning and Management
Guide to be updated once the
Capital Strategy has been approved
to ensure the two are aligned and
provide clarity. 
31 Mar 2022
30 Sep 2022
31 Dec 2022 
31 Mar 2023
30 Sep 2023 
Similar to the FTPP
document, this is dependent
on the completion of the
Capital Investment Strategy
which the Head of
Commercial Services has
advised will not be going to
P&R in October as intended.
This report is likely to go to
P&R early 2023-24 therefore
the Management Guide will
not be updated until this has
happened. 
Delayed and Rescheduled 
Head of Commercial
Services/Finance
Manager 
LIFELONG LEARNING & SUPPORT - ADDITIONAL SUPPORT NEEDS
Format of Child Plans 
The Council do not use a standard format
for child plans however this will be
addressed when all plans are recorded on
SEEMiS. However sample testing
highlighted that plans do not always
include a next review date. 
Low
As child plans are reviewed over the
coming school session 2019-20 they
will be converted onto the Well-being
App format, this format contains a
“Date of Next review “field.  Schools
will be supported to change all plans
to the new format within the Well-
being App by Area Principal
Teachers.  During the year there will
be checks to see how many plans
have been converted and to check if
the date of review field has been
completed.
30 Sep 2020
31 Dec 2020 
30 Jun 2021
30 Jun 2022
31 Jan 2023
30 Apr 2023 
From the drill down report
and the staged intervention
levels there are 20% of
schools where child plans
have not been transferred to
the WBA.  The Education
Officer and Head of Service
will be assertive with Head
Teachers and make it clear
this has to be completed as
soon as possible. 
Delayed and Rescheduled
Education Officer 
Page 27

Page 28

ROADS & INFRASTRUCTURE SERVICES - FLEET MANAGEMENT
Driving Hours Compliance 
Fleet drivers not subject to EU legislation
maintain manual driving records which are
handed to supervisors on a weekly basis
to check and sign. This is a resource
intensive process which is subject to
human error. There would be clear
process efficiency gains and less risk of
error if the Council adopted the system
already in place for fleet drivers subject to
EU legislation and rolled out electronic
driver cards to all fleet drivers. 
Low
The key officer will ensure that all
drivers hold and use tachograph
cards to move away from the paper
book records. 
31 Dec 2020
31 Mar 2021
30 Jun 2021
31 Mar 2022
30 Jun 2022
31 Aug 2022
31 Mar 2023
31 May 2023 
Training for using the
tachographs is underway and
will continue through the
month of February. The
operations team have
highlighted staff shortage as
the reason the training has
been delayed. All equipment
is in place. The roll out and
implementation of use will be
after the winter programme is
complete. The date for
implementation is 22nd May
2023. The new date will allow
for sufficient training to be
undertaken and information
sessions given by the Fleet
team.   
Delayed and Rescheduled
Procurement/Technical
Officer 
Page 28

Page 29

ARGYLL AND BUTE COUNCIL  AUDIT AND SCRUTINY COMMITTEE
STRATEGIC FINANCE  16 MARCH 2023 
INTERNAL AUDIT – EXTERNAL QUALITY ASSESSMENT 
1.0  INTRODUCTION 
1.1  This report is to inform the Audit and Scrutiny Committee of the findings from
the recent external quality assessment of the Council’s Internal Audit in
accordance with the Public Sector Internal Audit Standards (PSIAS). 
2.0 RECOMMENDATIONS 
2.1 Members of the Committee are requested to review and endorse the findings of
the assessment at Appendix 1 including the agreed action plan.  
3.0 DETAIL
3.1 The mandatory Public Sector Internal Audit Standards (PSIAS), published in
April 2013 and updated in March 2017, apply to all internal audit service
providers in the UK public sector. To supplement the PSIAS, and provide 
specific guidance surrounding its application within a local government
setting, the Chartered Institute of Public Finance and Accountancy (CIPFA)
compiled a Local Government Application Note, (LGAN) which was updated
in 2019.   
3.2 The PSIAS require the Chief Audit Executive (the Chief Internal Auditor (CIA)
in Argyll and Bute Council) to develop and maintain a quality assurance and
improvement programme (QAIP) that covers all aspects of the internal audit
activity. The QAIP must include both periodic internal self-assessments and
five yearly external assessments, carried out by a qualified, independent
assessor from outwith the organisation, and enable evaluation of the internal
audit activity’s conformance with the PSIAS, including the Mission of Internal
Audit, Definition of Internal Auditing and Code of Ethics. In addition, the QAIP
should also assess the efficiency and effectiveness of the internal audit
activity and identify opportunities for improvement. 
3.3  The Scottish Local Authorities Chief Internal Auditors’ Group has developed
an external quality assessment framework to satisfy the requirement for a five
yearly external assessment. The attached report sets out the findings from
the external quality assessment of Argyll and Bute Council’s Internal Audit
service, which was recently undertaken by the Chief Internal Auditor of East
Dunbartonshire Council. 
Page 29 Agenda Item 6

Page 30

3.4 The key points/themes of the report to highlight are: 
 The overall conclusion of the external assessment is that Argyll and
Bute Council’s Internal Audit service fully conforms with the PSIAS
and the LGAN for internal audit in the United Kingdom; 
 The team is highly qualified with a training plan in place to address any
skills gaps within the team and delivers a high quality service for the
Council and which is evident by the questionnaires returned after the
completion of each review; 
 A thorough and comprehensive audit pack was submitted and
evidenced which assisted the assessment process. 
3.5 The full assessment and observations by the assessor on each area of
assessment are contained in Appendix 1. 
4.0 CONCLUSION 
4.1 
4.2
The Internal Audit service has been assessed as fully compliant with PSIAS.
Two minor areas were identified which could be further developed for
completeness and ease of demonstration of compliance, both issues have
been accepted. One of these recommendations has already been
implemented and the other will be implemented as part of the review of the
Annual Governance Statement and Internal Audit Annual Report later in the
summer of 2023. 
Overall the CIA is satisfied that comprehensive arrangements are in place
within Argyll and Bute Council’s internal audit service which strongly support
the organisation and those charged with governance responsibilities, including
but not limited to the Monitoring Officer, Section 95 Officer and the Audit and
Scrutiny Committee. 
4.3 The CIA would like to express his sincere appreciation to the Assessor, Gillian
McConnachie who undertook a detailed and in depth review in accordance with
the Standards and also for the fair and professional way it was undertaken. 
5.0 IMPLICATIONS 
5.1 Policy – None
5.2 Financial - None directly from this report however an effective Internal Audit
service assists with effective governance and stewardship of Council
resources
5.3 Legal – None
5.4 HR - None
5.5 Fairer Scotland Duty - None
5.5.1 Equalities – None
5.5.2 Socio-Economic Duty – None
5.5.3 Islands Duty - None
Page 30

Page 31

5.6 Risk – None
5.7 Customer Service - None 
Paul Macaskill
Chief Internal Auditor
16 March 2023 
For further information please contact: 
Paul Macaskill, Chief Internal Auditor (01546  604108) 
Appendices:
1. Argyll and Bute Council Internal Audit Service External Quality Assessment
and action plan 
Page 31

Page 32

This page is intentionally left blank

Page 33

January 2023 Page 1 
EXTERNAL QUALITY
ASSESSMENT 2
OF 
ARGYLL & BUTE COUNCIL’S 
INTERNAL AUDIT SERVICE 
Report Recipients: 
Martin Caldwell, Chair of the Audit and Scrutiny Committee 
Pippa Milne, Chief Executive
Ann Blue, Head of Financial Services
Paul MacAskill, Chief Internal Auditor 
Page 33

Page 34

EXECUTIVE SUMMARY 
2
1. INTRODUCTION 
1.1 The mandatory Public Sector Internal Audit Standards (PSIAS), initially published in April
2013 and updated in March 2017, apply to all internal audit service providers in the UK
public sector.  To supplement the PSIAS, and provide specific guidance surrounding its
application within a local government setting, the Chartered Institute of Public Finance
and Accountancy (CIPFA) compiled a Local Government Application Note, last updated
in 2019. 
1.2 The objectives of the PSIAS are: 
 to define the nature of internal auditing within the UK public sector; 
 to set basic principles for carrying out internal audit; 
 to establish a framework for providing internal audit services, which add value to
the organisation, leading to improved organisational processes and operations; 
 to establish the basis for the evaluation of internal audit performance; and 
 to drive improvement planning. 
1.3 The PSIAS require the Chief Audit Executive (the Chief Internal Auditor in Argyll & Bute
Council) to develop and maintain a quality assurance and improvement programme
(QAIP) that covers all aspects of the internal audit activity.  The QAIP must include both
periodic internal self-assessments and five-yearly external assessments.  The external
assessments must be carried out by a qualified, independent assessor from outwith the
organisation, and enable evaluation of the internal audit activity’s conformance with the
PSIAS, including the Mission of Internal Audit, Definition of Internal Auditing and Code
of Ethics.  In addition, the QAIP should also assess the efficiency and effectiveness of
the internal audit activity and identify opportunities for improvement. 
1.4 To assist its members in meeting the five-yearly external assessment requirement, the
Scottish Local Authorities Chief Internal Auditors’ Group (SLACIAG) established a
collaborative system of formal peer reviews.  This approach not only assists with
ensuring that independent assessors, and their teams, have appropriate knowledge and
experience of the local government internal audit environment but also removes the
financial burden from councils associated with procuring these services externally.  The
independence of assessors was considered when allocating assessment teams to
councils participating in the peer review process, ensuring that, amongst other governing
principles, local authorities with perceived/known conflicts of interest could not review
one another.  At the outset, assessors were required to formally declare any interests so
that these could be appropriately addressed during the allocation process.  East
Dunbartonshire Council was selected to carry out the external assessment of Argyll &
Bute.   
1.5 To support the peer review process, SLACIAG developed a comprehensive External
Quality Assessment (EQA) framework, including an EQA Checklist for Assessing
Conformance with the PSIAS and the Local Government Application Note (EQA
Checklist) and a key Stakeholder Questionnaire proforma.  East Dunbartonshire
Council’s Internal Audit service has carried out the external assessment of Argyll & Bute
Council’s Internal Audit service utilising this framework.   
1.6 This report provides a high level summary of requirements for each standard per the
PSIAS and CIPFA Local Government Application Note and details findings, conclusions
and recommendations from the external assessment.  This assessment has involved
discussions with key members of staff, including the Chief Audit Executive, review of the
most recent self-assessment carried out utilising the EQA Checklist and consideration
Page 34

Page 35

EXECUTIVE SUMMARY 
3
of other relevant supporting documentation/information (Evidence Pack) including
working paper files and completed stakeholder questionnaires.  A comprehensive list of
supporting documentation/information and completed stakeholder questionnaires
considered as part of the assessment can be found at appendices B and C respectively. 
1.7 The Assessor would like to thank the Chief Internal Auditor (CIA) for the comprehensive
audit pack that was provided, for the further information that was provided via interview
and on request and for access to the Internal Audit Team members – this all enabled a
smooth and efficient audit process.  Thanks is also extended to all who gave up their
time to complete the stakeholder questionnaires and to be interviewed – this enhanced
the quality of the audit, allowing fuller picture of the Internal Audit Service to be obtained
and thus a more accurate assessment. 
Page 35

Page 36

4 
2.  OVERALL CONCLUSION
2.1 The overall conclusion of the external assessment is that Argyll and Bute Council’s
Internal Audit service fully conforms with the PSIAS.  Two points for improvement have
been noted with regards to Standard 2400  - Communicating Results and Standard 1100
- Independence and Objectivity.  Both Standards have nonetheless been assessed as
fully conforms due to the minor nature of the findings.  A full summary of assessment,
per assessment area, can be found at Appendix A.  A summary of totals is as follows:   
Fully
Conforms     
Generally
Conforms     
Partially
Conforms     
Does Not
Conform   
TOTALS 14 0 0 0 
2.2 The areas for improvement highlighted in the report are as follows: 
 The annual governance statement for 2021/22 referred to the Contract
Management Roads and Amenity Services audit conclusion of limited assurance.
Whilst this was noted in a table in the annual audit report, it was not mentioned
in the opinion or report wording.  Instead, reference was made to ‘Subject to
matters listed in the annual governance statement’ in the conclusion of the
covering report. It may help the Audit and Scrutiny (A&S) Committee and provide
clarity if such matters are specifically referred to in the Annual Audit Report. 
 The register of interest which is used to identify potential conflicts of interest on
internal audit work was noted during the review as having been last updated in
February 2021.  The risk is deemed to be low as during the review, Internal Audit
staff demonstrated awareness of when they would flag any potential conflicts of
interest to the Chief Internal Auditor.   This action point has now been completed.
Going forward, the CIA should ensure that the register of interest is updated at
least annually in order to fully demonstrate compliance with PSIAS in this regard. 
2.3 Full details of the assessment recommendations and management responses can be
found in the Action Plan at Appendix D. 
Page 36

Page 37

5 
3.  SECTION A – MISSION OF INTERNAL AUDIT AND CORE PRINCIPLES 
The PSIAS state that the Mission of Internal Audit articulates what internal audit aspires
to accomplish within an organisation, which is ‘to enhance and protect organisational
value by providing risk-based and objective assurance, advice and insight’.   
Taken as a whole, the Core Principles for the Professional Practice of Internal Auditing,
as set out in the PSIAS, articulate internal audit effectiveness.  For an internal audit
function to be considered effective, all Core Principles should be present and operating
effectively.  Failure to achieve any of the Core Principles would imply that an internal
audit activity was not as effective as it could be in achieving the Mission of Internal Audit. 
3.1 Evidence obtained from assessing conformance with other standards in the PSIAS has
been used, along with specific consideration surrounding the achievement of the Core
Principles, to conclude that the Internal Audit service at Argyll & Bute Council fully
conforms with accomplishing the Mission of Internal Audit as detailed above. 
4. SECTION B – DEFINITION OF INTERNAL AUDITING 
The PSIAS state that internal auditing is an independent, objective assurance and
consulting activity designed to add value and improve an organisation’s operations. It
helps an organisation accomplish its objectives by bringing a systematic, disciplined
approach to evaluate and improve the effectiveness of risk management, control and
governance processes. 
4.1 Evidence obtained from assessing conformance with other standards in the PSIAS has
been used to conclude that the Internal Audit service at Argyll & Bute Council fully
conforms with the definition of Internal Auditing as detailed above.  The main reason
for this assessment has been the review of the activities, approach and status of the
Internal Audit service throughout the independent review.  Completed Stakeholder
Questionnaires support this conclusion. 
4.2 The Internal Audit service does not currently carry out consulting activity; however, the
Internal Audit Charter makes provision for the possibility of the service carrying out such
work and specifies the parameters for accepting consulting engagements. 
4.3 The Internal Audit service has in place an Internal Audit Charter and the definition of
Internal Auditing included in this document mirrors the PSIAS definition.  Furthermore,
the Internal Audit Plan takes into account the PSIAS requirements, ensuing that the plan
of work aligns to PSIAS.   
5.  SECTION C – CODE OF ETHICS 
The PSIAS state that the purpose of the Institute of Internal Auditor’s Code of Ethics is
to promote an ethical culture in the profession of internal auditing. A code of ethics is
necessary and appropriate for the profession of internal auditing, founded as it is on the
trust placed in its objective assurance about risk management, control and governance. 
Internal auditors in UK public sector organisations must conform to the Code of Ethics
as set out in the PSIAS. If individual internal auditors have membership of another
professional body then he or she must also comply with the relevant requirements of
that organisation. 
5.1 Evidence obtained from assessing conformance with other standards in the PSIAS have
been used to conclude that Argyll & Bute Council’s Internal Audit service fully conforms
with the requirement to comply with the Code of Ethics.  The following standards have
been considered in particular:
The Attribute Standards -
 1000 – Purpose Authority and Responsibility, 
Page 37

Page 38

6 
 1100 – Independence and Objectivity, and
 1200 – Proficiency and Due Professional Care. 
The Professional Standards -
 2000 – Managing the Internal Audit Activity and 
 2300 – Performing the Engagement. 
5.2 Completed Stakeholder Questionnaires also support the conclusion. In addition, the
Audit Charter was reviewed and confirmed as being in line with good practice, adhering
to the guidance. 
6. SECTION D – ATTRIBUTE STANDARDS 
Attribute Standards apply to organisations and to individual internal auditors
providing the internal audit service in a local authority. 
6.1 1000 - Purpose, Authority, and Responsibility 
The PSIAS state that the purpose, authority and responsibility of the internal audit
activity must be formally defined in an Internal Audit Charter, consistent with the Mission
of Internal Audit and the mandatory elements of the International Professional Practices
Framework.  The chief audit executive must periodically review the internal audit charter
and present it to senior management and the board for approval.  The internal audit
charter must also: 
 define the terms ‘board’ and ‘senior management’ for the purposes of internal
audit activity;
 cover the arrangements for appropriate resourcing; 
 define the role of internal audit in any fraud-related work; and 
 describe safeguards to limit impairments of independence or objectivity if internal
audit or the chief audit executive undertakes non-audit activities. 
6.1.1  Argyll & Bute Council’s Internal Audit Charter is periodically reviewed, with the most
recent review taking place in March 2022.  The requirements referred to above are
adhered to in the Charter, and the Charter was approved by the A&S Committee on 15
March 2022. 
6.1.2 Having considered the findings above, it has been concluded that the Internal Audit
service at Argyll & Bute Council fully conforms with Standard 1000 on Purpose,
Authority and Responsibility. 
6.2 1100 - Independence and Objectivity 
The internal audit activity must be independent and internal auditors must be objective
in performing their work.  Various aspects of independence and objectivity are covered
in this standard as well as 1200, including reporting functional lines of the CAE, the
relationship between the CAE and the board and any impairment to individual internal
auditor’s objectivity or independence. Reporting and management arrangements must
be put in place that preserve the CAE’s independence and objectivity, in particular with
regard to the principle that the CAE must be independent of the audited activities. 
6.2.1 The CIA reports functionally to the A&S Committee and administratively to the Head of
Financial Services, who attends the Council’s Strategic Management Team.  The CIA
has direct and unrestricted access to the Chief Executive and the Chair of the A&S
Committee and this has been confirmed through the completed Stakeholder
Questionnaires.  These reporting and access arrangements are clearly defined in the
Page 38

Page 39

7 
Internal Audit Charter as are safeguards to limit impairment of independence or
objectivity.   
6.2.2 In support of organisational independence, the CIA attends A&S Committee meetings
to present all internal audit reports (including, for example, the Internal Audit Charter,
Annual Report, Internal Audit Plan and reports from the planned audits) to Elected
Members.  The reports are submitted in the CIA’s name.   
6.2.3 The CIA has operational responsibility for the Counter Fraud Team and Risk
Management and this is communicated to stakeholders via the Internal Audit Charter.   
6.2.4 A minor point for improvement has been noted in that it has been observed that the
register of interest, used to record potential conflicts of interest, appears to have been
last updated in February 2021.  Going forward, this should be updated on at least an
annual basis.  Nonetheless, from interviews with members of the Internal Audit Service,
members of the team are aware of when they should flag potential conflicts with the CIA
and so the risk is largely mitigated. See Appendix – Action 1. 
6.2.5 Argyll & Bute Council’s Internal Audit service fully conforms with Standard 1100 on
Independence and Objectivity. 
6.3 1200 - Proficiency and Due Professional Care 
The CAE must be professionally qualified, suitably experienced and responsible, in
accordance with the organisation’s human resources processes, for recruiting
appropriate staff.  He or she is responsible for ensuring that up-to-date job descriptions
exist, reflecting roles and responsibilities, and that person specifications define the
required qualifications, competencies, skills, experience and personal attributes. 
The CAE should periodically assess individual auditors’ skills and competencies against
those set out in the relevant job descriptions and person specifications. Any training or
development needs identified should be included in an appropriate ongoing
development programme that is recorded and regularly reviewed and monitored. In
addition, all internal auditors have a personal responsibility to undertake a programme
of continuing professional development (CPD) to maintain and develop their
competence. This may be fulfilled through requirements set by professional bodies or
through the organisation’s own appraisal and development programme. Auditors should
maintain a record of such professional training and development activities. 
The internal audit activity should be appropriately resourced to meet its objectives. It
should have appropriate numbers of staff in terms of grades, qualifications, personal
attributes and experience or have access to appropriate resources in order to meet its
objectives and to comply with these standards. The PSIAS states that the CAE must
obtain competent advice and assistance if the activity is unable to perform all or part of
an engagement. 
6.3.1 The CIA is required to hold a relevant CCAB professional accountancy qualification and
the CIA holds two such qualifications, Chartered Institute of Public Finance and
Accountancy (CIPFA) and Chartered Institute of Internal Auditors (CIIA), and is suitably
experienced.  The CIA is a member of SLACIAG and regularly attends and contributes
to meetings.  Argyll & Bute Council’s Internal Audit service is represented on the two
SLACIAG Sub-groups: the Computer Audit Sub-Group (CASG) and the Scottish Local
Authorities Investigators Group (SLAIG).  The CIA has a background in both financial
and IT audit in the public sector.  Questionnaires received from stakeholders have
confirmed the opinion that the CIA is suitably experienced with 29 years of experience
in public sector audit. 
6.3.2 For the roles across the Argyll & Bute Council’s Internal Audit service, there are job and
person specifications in place.  There are a total of five members of staff in the Internal
Audit service, including the CIA.  The Internal Audit service delivers internal audit
Page 39

Page 40

8 
services to the Council, HSCP and ALEO.  The team is highly qualified with a training
plan is in place to address any skills gaps within the team and delivers a high quality
service for the Council and which is evident by the questionnaires returned after the
completion of each review. 
6.3.3 The Internal Audit Team participate in a Performance Review and Development
process.   
6.3.4 The CIA and Audit Team have specific CPD requirements to adhere to.  Each Auditor is
a member of a professional body and is required to maintain a CPD file and in terms of
CIPFA an annual declaration of compliance. 
6.3.5 Argyll & Bute Council’s Internal Audit service fully conforms with standard 1200 on
Proficiency and Due Professional Care. 
6.4 1300 - Quality Assurance and Improvement Programme 
The PSIAS state that the Chief Audit Executive must develop and maintain a quality
assurance and improvement programme (QAIP) that covers all aspects of the internal
audit activity. 
The QAIP must include both periodic internal self-assessments and five-yearly external
assessments, carried out by a qualified, independent assessor from outside the
organisation, and enable evaluation of the internal audit activity’s conformance with the
PSIAS, including the Definition of Internal Auditing and Code of Ethics. In addition, the
QAIP should also assess the efficiency and effectiveness of the internal audit activity
and identify opportunities for improvement. 
The public sector requirement in the PSIAS states that results of the QAIP and progress
against any improvement plans must be reported in the annual report. 
6.4.1 Internal audit reports are reviewed by the CIA prior to issue and working papers are
reviewed by the CIA.   
6.4.2 Post audit surveys are sent to audit contacts after the completion of each audit to assess
the performance and quality of reports.  Internal audit have a positive performance target
of 80% from these surveys and performance is monitored against this target. 
6.4.3 Internal Audit monitor their development plan and the status of all development actions
is reported to the A&S Committee as part of a standard agenda item.   
6.4.4 An external assessment against Public Sector Internal Audit Standards was previously
carried out by the Chief Internal Auditor for FTF Audit and reported to the A&S
Committee in September 2018.  The internal audit service was concluded as
demonstrating overall compliance with PSIAS requirements, whilst four areas relating to
risk were identified for improvement. An action plan was developed to address these
areas and these improvement actions have been completed. 
6.4.5 Argyll & Bute Council’s Internal Audit service fully conforms with Standard 1300 on
Quality Assurance and Improvement Programme. 
7. SECTION E – PERFORMANCE STANDARDS 
Performance Standards describe the nature of the internal audit services being
provided and provide criteria against which the performance of an internal audit
function can be measured. 
7.1 2000 - Managing the Internal Audit Activity 
The chief audit executive must effectively manage the internal audit activity to ensure it
adds value to the organisation.  The internal audit activity is effectively managed when
Page 40

Page 41

9 
it achieves the purpose and responsibility included in the internal audit charter, it
conforms with the PSIAS, its individual members conform with the Code of Ethics and
the PSIAS and it considers trends and emerging issues that could impact the
organisation.  The internal audit activity adds value to the organisation and its
stakeholders when it considers strategies, objectives and risks; strives to offer ways to
enhance governance, risk management, and control processes; and objectively
provides relevant assurance. 
7.1.1 An annual Internal Audit Plan is compiled by the CIA outlining the planned programme
of work to be undertaken.  The CIA attends SMT meetings on a fortnightly basis which
ensures he is well sighted on the Council’s strategies, objectives and risks and of any
issues that occur which may change the risk profile of the Council and, subsequently,
areas for audit focus.  In addition, the CIA reviews Business Plans, Local Outcome
Agreement and Corporate and Operational Risk Registers. 
7.1.2 The A&S Committee agrees and endorses the Internal Audit Plan. 
7.1.3 The Internal audit service reports on performance to the Committee on a quarterly basis
including full copies of audit reports issued, progress implementing audit
recommendations, performance against agreed performance indicators and a summary
of all internal audit activity in the previous quarter. 
7.1.4 Argyll & Bute Council’s Internal Audit service fully conforms with Standard 2000 on
Managing the Internal Audit Activity. 
7.2 2100 - Nature of Work 
The internal audit activity must evaluate and contribute to the improvement of the
organisation’s governance, risk management, and control processes using a systematic,
disciplined, and risk-based approach. Internal audit credibility and value are enhanced
when auditors are proactive and their evaluations offer new insights and consider future
impact. 
More specifically, the internal audit activity must assess and make appropriate
recommendations to improve the organisation’s governance processes, evaluate the
effectiveness and contribute to the improvement of risk management processes and
assist the organisation in maintaining effective controls by evaluating their efficiency and
effectiveness and promoting continuous improvement. 
7.2.1 Audit work regularly focuses on areas of governance such as robustness of policies and
procedures, performance reporting (which focuses on the achievement of strategic
objectives), budget monitoring (financial information), and compliance with relevant
legislation. 
7.2.2 An audit assessing compliance with the Council’s risk management arrangements is
performed every three years. 
7.2.3 Controls are assessed through the internal audit plan and through considerations on
individual assignments. 
7.2.4 Fraud risks are considered and Internal audit carry out a programme of continuous
monitoring which provides audit coverage across the main financial transactional
processes on an annual basis. This helps to ensure there are good controls in relation
to processing transactions which, in turn, reduces the risk of fraud. 
7.2.5 Argyll & Bute Council’s Internal Audit service fully conforms with Standard 2100 on
Nature of Work. 
Page 41

Page 42

10 
7.3 2200 - Engagement Planning 
Internal auditors must develop and document a plan for each engagement, including the
engagement’s objectives, scope, timing and resource allocations. The plan must
consider the organisation’s strategies, objectives and risks relevant to the engagement. 
The CIPFA Local Government Application note states that for each engagement, a brief
should be prepared, discussed and agreed with relevant managers. The brief should
establish the objectives, scope and timing for the assignment and its resource and
reporting requirements. Audit work should be undertaken using a risk-based audit
approach. 
7.3.1 Terms of Reference planning documents are in place which include objectives, scope,
timing, resources allocated and consideration of the organisation’s strategies, objectives
and risks relevant to the engagement. The final Terms of Reference document is agreed
with the relevant Head of Service. 
7.3.4 Argyll & Bute Council’s Internal Audit service fully conforms with Standard 2200 on
Engagement Planning. 
7.4 2300 - Performing the Engagement 
Internal auditors must identify, analyse, evaluate and document sufficient information to
achieve the engagement’s objectives. 
At each stage of the audit, auditors should consider what specific work needs to be
conducted and evidence needs to be gathered to achieve the engagement objectives
and support an independent and objective audit opinion.  Systems should be in place to
ensure that auditors obtain and record, within the working papers, sufficient evidence to
support their conclusions, professional judgements and recommendations.  Working
papers should always be sufficiently complete and detailed to enable an experienced
internal auditor with no previous connection with the audit to ascertain what work was
performed, re-perform it if necessary and support the conclusions reached.  The CAE
should also specify how long all audit documentation should be retained, whether held
on paper or electronically.  All audit work should be subject to an appropriate internal
quality review process. 
Internal auditors must be alert to the possibility of intentional wrongdoing, errors and
omissions, poor value for money, failure to comply with management policy and conflicts
of interest when performing their individual audits. They must also have sufficient
knowledge to identify indicators that fraud or corruption may have been committed. 
7.4.1 The Internal Audit Manual sets out the procedure in relation to undertaking a planned
audit, including preparing working papers and setting up working paper files.   
7.4.2 Electronic engagement records are kept in a restricted folder and on Sharepoint.  ICT
are responsible for the security controls, and the CIA is responsible for specifying who
should have access to this. 
7.4.3 Work Programmes have been standardised. These detail the test of control, the work
performed, results, conclusion, issues raised and risk.   
7.4.4 A standard template is also utilised for the CIA performing a review of the file – an audit
review schedule, where any questions the CIA may have are noted for the auditor to
answer.  This helps to ensure consistency and quality of both the audit files and of the
final report. 
7.4.5 Argyll & Bute Council’s Internal Audit service fully conforms with Standard 2300 on
Performing the Engagement. 
Page 42

Page 43

11 
7.5 2400 - Communicating Results 
The basic aims of every internal audit report should be to: 
 give an opinion on the risk and controls of the area under review, building up to
the annual opinion on the overall adequacy and effectiveness of the
organisation’s framework of governance, risk management and control;
 prompt management to implement the agreed actions for change leading to
improvement in the control environment and performance; and
 provide a formal record of points arising from the audit and, where appropriate,
of agreements reached with management, together with appropriate timescales. 
Each report should include the scope and purpose of the audit to help the reader to
understand the extent, or limitations, of the assurance(s) provided by the report.  During
the course of the audit, key issues should be brought to the attention of the relevant
manager to enable them to take corrective action and to avoid surprises at the closure
stage.  Before issuing the final report, the internal auditor should normally discuss the
contents with the appropriate levels of management to confirm the factual accuracy, to
seek comments and to confirm the agreed management actions. A draft report is useful
for this purpose.  Recommendations should be prioritised according to risk. The
recommendations and the resultant management action plans should be agreed prior to
the issue of the final report.  Any areas of disagreement between the internal auditor and
management that cannot be resolved by discussion should be recorded in the action
plan and the residual risk highlighted.  Those weaknesses giving rise to significant risks
that are not agreed should be brought to the attention of a more senior level of
management and the board. 
As set out in the PSIAS, the CAE must deliver an annual internal audit opinion and report
that can be used by the organisation to inform its annual governance statement. This
must include the annual internal audit opinion concluding on the overall adequacy and
effectiveness of the organisation’s governance, risk and control framework, a summary
of the audit work from which the opinion is derived (including reliance placed on work by
other assurance bodies); and a statement of conformance with the PSIAS and the
results of the internal audit QAIP. 
7.5.1 Each report issued by Internal Audit outlines the auditors’ conclusions and significant
issues identified.  Reviews which identify significant or serious control weaknesses form
part of the annual reporting and formal opinion reached in terms of the control
environment. 
7.5.2 As part of the standard audit approach, the team member carrying out the audit will have
a feedback meeting with the key audit contact to discuss the arising issues.  There will
also be iterative communication with the key contact to clear the audit report.  These
communications are primarily made by e-mail due to the geographic spread of the
Council. 
7.5.3 With regards to handling disagreements, it is rare that a manager would not implement
a recommendation.  Internal Audit always aim to find common ground in relation to
recommendations and implementation. In instances of unresolvable disagreement, the
report would highlight that agreement could not be reached and the potential risk to the
organisation.  This would be reported to the A&S Committee. 
7.5.4 The annual governance statement referred to the Contract Management Roads and
Amenity Services having been given limited assurance.  Whilst this was noted in a table
in the annual audit report, it was not mentioned in the opinion wording.  Instead,
reference was made in the covering paper conclusion to ‘Subject to matters listed in the
annual governance statement’.  It may help the A&S Committee and provide clarity if
Page 43

Page 44

12 
such matters are specifically referred to in the Annual Audit Report and Opinion. See
Appendix – Action 2. 
7.5.5 Argyll & Bute Council’s Internal Audit service fully conforms with Standard 2400 on
Communicating Results. 
7.6 2500 - Monitoring Progress 
The PSIAS place responsibility for monitoring progress with the CAE to ensure that
management actions have been effectively implemented or, if not, that senior
management have accepted the risk of not taking action.  The CAE must, therefore,
implement a follow-up process for ensuring the effective implementation of audit results
or ensuring senior management are aware of the consequences of not implementing an
action point and are prepared to accept the risk of such consequences occurring. The
results of this process should be communicated to the board.  The CAE should develop
escalation procedures for cases where agreed actions have not been effectively
implemented by the date agreed. These procedures should ensure that the risks of not
taking action have been understood and accepted at a sufficiently senior management
level. The effective involvement of the board in the follow-up process is critical to
ensuring that it works. The CAE should consider revising the internal audit opinion in
light of findings from the follow-up process.  The findings of follow-up reviews should
inform the planning of future audit work. 
7.6.1 There is a comprehensive follow up programme in place whereby actions are followed
up on a quarterly basis with the agreed responsible person in order to gauge and monitor
progress with the agreed actions.   
7.6.2 Progress with actions is reported to the Strategic Management Team and the A&S
Committee on a quarterly basis. Follow-up results are also taken into account and
referred to in the annual report. 
7.6.3 Argyll & Bute Council’s Internal Audit service fully conforms with Standard 2500 on
Monitoring Progress. 
7.7 2600 - Communicating the Acceptance of Risks 
When the chief audit executive concludes that management has accepted a level of risk
that may be unacceptable to the organisation, they must discuss the matter with senior
management. If the chief audit executive determines that the matter has not been
resolved, they must communicate the matter to the board. It is not the responsibility of
the chief audit executive to resolve the risk. 
7.7.1 The CIA has unrestricted access to the Chief Executive and Chair of the A&S Committee
and can provide assurance that, should it be required, he can escalate issues directly to
them.  The CIA also attends SMT meetings giving him access to the SMT should he
have any concerns that need to be raised. 
7.7.2 All audit reports are taken to the A&S Committee and are presented to the SMT. 
7.7.3 The CIA contributes to the annual governance statement and the annual audit opinion
is reported to the A&S Committee. 
7.7.4 Argyll & Bute Council’s Internal Audit service fully conforms to the Standard on
Communicating the Acceptance of Risk. 
Gillian McConnachie CA
Audit & Risk Manager and Chief Internal Auditor
East Dunbartonshire Council
January 2023
Page 44

Page 45

13 
APPENDIX A – SUMMARY OF ASSESSMENT 
REF PAGE
No. ASSESSMENT AREA
Fully
Conforms 
Generally
Conforms 
Partially
Conforms 
Does Not
Conform 
Section A 5 Mission of Internal Audit and Core Principles    
Section B 5 Definition of Internal Auditing    
Section C 5 Code of Ethics    
Section D 6 ATTRIBUTE STANDARDS 
1000 6 Purpose, Authority and Responsibility    
1100 6 Independence and Objectivity    
1200 7 Proficiency and Due Professional Care    
1300 8 Quality Assurance and Improvement Programme    
Section E 8 PERFORMANCE STANDARDS 
2000 8 Managing the internal Audit Activity    
2100 9 Nature of Work    
2200 10 Engagement Planning    
2300 10 Performing the Engagement    
2400 11 Communicating Results    
Page 45

Page 46

14 
2500 12 Monitoring Progress    
2600 12 Communicating the Acceptance of Risks    
TOTALS 14 0 0 0
Page 46

Page 47

15 
APPENDIX B – EVIDENCE PACK
The following represent the main sources of evidence that were
considered in the course of the review:
 Minutes and papers from A&S Committee
 Audit Manual
 Stakeholder Questionnaires
 Interviews with the CIA, members of the audit team and an Executive Director
 Job Descriptions
 Code of Conduct
 Performance and Career Conversation Template
 Evidence of qualification
 Organisational chart
 Audit Survey Template
 CPD records
 Audit Survey Monitoring and Actions
 Prior EQA report
 Audit Plan Consultation
 HSCP Audit Plan Consultation
 Assurance Mapping
 Audit Universe
 Audit Plan
 Anti-Fraud Strategy 
 LiveArgyll Service Level Agreement
 A sample of audit files 
APPENDIX C – STAKEHOLDER QUESTIONNAIRES
Stakeholder questionnaires were completed by the following key members of staff and Elected
Members:
 Martin Caldwell, Chair of the A&S Committee
 Pippa Milne, Chief Executive
 Kirsty Flanagan, Executive Director
 Douglas Hendry, Executive Director
Page 47

Page 48

16 
APPENDIX D – ACTION PLAN
No.  Para  Recommendation  Management Response  Responsible Officer
/ Agreed
Completion Date 
1 6.2.4
The register of interest which is used to identify potential
conflicts of interest on internal audit work appears to
have been last updated in Feb 2021.  The risk is deemed
to be low as staff demonstrate awareness of when they
would flag any potential conflicts of interest to the Chief
Internal Auditor.  Nonetheless the register should be
updated as soon as practical and annually thereafter in
order to fully demonstrate compliance with PSIAS in this
regard.
Whilst there was a register of interest in place for staff, this
should have been reviewed annually as outlined in the
recommendation. This has since been fully reviewed and
updated and an updated copy has been provided to the
Assessor as evidence of completion.
Completed 21st
December 2022.
2 7.5.4
The annual governance statement for 2021/22 referred to
the Contract Management Roads and Amenity Services
audit conclusion of limited assurance.  Whilst this was
noted in a table in the annual audit report, it was not
mentioned in the opinion or report wording.  Instead,
reference was made to ‘Subject to matters listed in the
annual governance statement’ in the conclusion of the
covering report.  It may help the Audit and Scrutiny
Committee and provide clarity if such matters are
specifically referred to in the Annual Audit Report.
This will be addressed as part of the review of the Annual
Governance Statement and also the production of the Internal
Audit Annual Report for 2022/23.
August 2023 
Critical 
Significant 
Routine 
Page 48

Page 49

ARGYLL AND BUTE COUNCIL  AUDIT AND SCRUTINY COMMITTEE 
FINANCIAL SERVICES 16 MARCH 2023 
2023/24 INTERNAL AUDIT PLAN 
1. INTRODUCTION 
1.1 This report introduces the 2023/24 Internal Audit Annual Audit Plan. 
2. RECOMMENDATIONS 
2.1 To agree and endorse the Internal Audit Annual Plan 2023/24 (Appendix 1).   
3. DETAIL 
3.1 The Public Sector Internal Audit Standards (PSIAS) stipulate that the Council’s
internal audit plan must be risk based and focused on governance, risk and
controls to allow the Chief Internal Auditor (CIA) to provide an annual opinion on
the Council’s internal control framework, based on the work undertaken during
the year. This annual opinion informs the Annual Governance Statement.    
3.2 The Annual Audit Plan is shown at Appendix 1. The creation of the plan gave
consideration to a number of factors including: 
 the audit universe risk assessment which is based upon a matrix taking
account of scores for each potential audit area in respect of materiality,
sensitivity, time elapsed since it was last subject to audit and the overall audit
assessment when it was last reviewed. 
 the Council’s strategic risk register and operational risk registers
 input from Executive Directors, the Health and Social Care Partnership (HSCP)
Chief Officer, Heads of Service and Audit and Scrutiny Committee members.
 a consideration of the need to provide audit coverage across all Heads of
Service, the HSCP and LiveArgyll  
 significant changes within the Council (i.e. new systems, new policies)
 wider issues in the public sector environment
 an internal audit team meeting to discuss possible areas of focus based on
cumulative audit knowledge.   
3.3 The Audit plan is broken down into 3 main areas which are: 
 Service department reviews
 Continuous monitoring programme
 Other Activity 
3.4 Service department reviews include auditable units within the audit universe
which are specific to an individual department. Our continuous monitoring
programme includes a number of auditable units which were historically subject
to individual annual audits. These areas are now tested on a regular recurring
basis with control weaknesses reported by exception. Internal Audit also
undertake other activities during the year including verification work and
following up on previous internal audit recommendations for improvement.
Page 49 Agenda Item 8

Page 50

3.5 An indicative outline scope is given for each of the audit reviews. Full terms of
reference will be discussed and agreed with the relevant Head of Service as part
of the planning process for each audit. 
3.6 The plan is based on an estimated available 668 audit days with suitable
contingency factored in. The plan remains fully flexible, to accommodate
changes in the Council’s risk profile and /or emerging risks. 
3.7 Feedback on the draft plan has been obtained from the Heads of Service, the
Chief Officer of the HSCP and the Live Argyll General Manager.  This has been
incorporated into the plan included as appendix 1 to this paper 
4. CONCLUSION 
4.1 The annual audit plan is risk based and is aligned to the Council’s long term
outcomes, corporate objectives and strategic risk register. The plan also
incorporates continuous monitoring and verification activity. 
5. IMPLICATIONS 
5.1 Policy - None
5.2 Financial - None
5.3 Legal - None
5.4 HR -  None
5.5 Fairer Scotland Duty - None
5.5.1 Equalities –  None
5.5.2 Socio-Economic Duty – None
5.5.3 Islands Duty – None
5.6 Climate Change - None
5.7 Risk – Delivery of an effective internal audit function and plan should help reduce
the Council’s risk exposure 
5.8 Customer Service – None 
Paul Macaskill, 
Chief Internal Auditor
16 March 2023                                                  
For further information contact: 
Paul Macaskill, Chief Internal Auditor (01436 604108) 
APPENDICES 
Appendix 1 – 2023/24 Internal Audit Plan 
Page 50

Page 51

ARGYLL AND BUTE COUNCIL
COMHAIRLE EARRA-GHÀIDHEAL AGUS BHÒID 
INTERNAL AUDIT PLAN 2023-24
Page 51

Page 52

2 
Argyll and Bute Council – Internal Audit 2023/24 Annual Audit Plan
Contents 
Purpose of Internal Audit ............................................................................................................................................................................................... 1
Public Sector Internal Audit Standards (PSIAS) Requirements.......................................................................................................................................... 1
Risk Assessment............................................................................................................................................................................................................. 2
Strategic Risks................................................................................................................................................................................................................ 4
Resourcing the Plan ....................................................................................................................................................................................................... 4
Confirmation of Independence ....................................................................................................................................................................................... 5
2023/24 Internal Audit Plan ........................................................................................................................................................................................... 5
Monitoring the Plan ....................................................................................................................................................................................................... 5
Quality Assurance and Improvement Programme ........................................................................................................................................................... 6
Conclusions.................................................................................................................................................................................................................... 6
Appendix 1 – 2023/24 Internal Audit Plan....................................................................................................................................................................... 7
Appendix 2 – 2023/24 Internal Audit Plan by Council Directorate / Head of Service ........................................................................................................10
Appendix 3 – Strategic Risk Register (Abridged) .............................................................................................................................................................11 
Contact Details 
Chief Internal Auditor: Paul Macaskill
Telephone: 01546 604108
e-mail: paul.macaskill@argyll-bute.co.uk
www.argyll-bute.gov.uk
Page 52

Page 53

1 
Argyll and Bute Council – Internal Audit 2023/24 Annual Audit Plan
Definition of Internal Audit
1. Internal auditing is an independent, objective assurance and consulting activity designed to add value and improve an organisation’s operations. It helps
an organisation accomplish its objectives by bringing a systematic, disciplined approach to evaluate and improve the effectiveness of risk management,
control and governance processes.
Source: Section 4: Definition of Internal Auditing: Public Sector Internal Audit Standards
Purpose of Internal Audit 
2. The main objective of internal audit is to provide a high quality, independent audit service to Argyll and Bute Council (the Council) which provides
annual assurances in relation to internal controls and overall governance arrangements.  In addition to this primary assurance role, internal audit will
also:
 support the S95 Officer and the Audit & Scrutiny Committee (the Committee) in the discharge of their duties
 support the Council’s Monitoring Officer
 support the Council’s anti-fraud and corruption arrangements 
 provide guidance on control implications for new or changed systems where appropriate
 support the Council and the Strategic Management Team during key transformational/ change projects.
Public Sector Internal Audit Standards (PSIAS) Requirements
3. PSIAS sets out the requirement for the:
 Chief Internal Auditor (CIA) to prepare a risk-based audit plan which takes into account the Council’s strategic objectives, associated risks and the
views of senior management and the Committee  
 CIA to review and adjust the plan as necessary in response to changes in the Council’s business, risks, operations and priorities
 audit plan to incorporate or be linked to a strategic or high-level statement of how internal audit will be delivered and developed in accordance
with the Internal Audit Charter and how it links to the organisational objectives and priorities. 
Page 53

Page 54

2 
Argyll and Bute Council – Internal Audit 2023/24 Annual Audit Plan
Risk Assessment
4. Internal audit’s approach to annual audit planning is risk-based with all areas which may be subject to audit review contained within an audit universe
which is subject to formal review, at least annually. This provides a layered approach to obtaining a sufficient profile of the organisation covering Core
Assurance, Audit Needs Assessment and Audit Universe. The audit universe includes all significant activities and systems that contribute to the
achievement of the Council’s priorities and objectives.  This is displayed in the diagrams on page 5 of this report.
5. The audit universe is risk assessed each year to help determine the annual audit plan and ensure that suitable audit time and resources are devoted to
reviewing the more significant areas of risk. Note however that that the audit universe, whilst a key factor, is not the only consideration when
determining the audit plan. Senior management have been consulted on priority areas for review, and cognisance is taken of the plans of external audit
and other statutory agencies, in order to avoid duplication, and increase potential for cross reliance. 
6. The audit universe risk assessment is based upon a matrix taking account of scores for each potential audit area in respect of:
 materiality (based on expenditure)
 sensitivity (Control Environment, Management Concerns, Political Sensitivity, Regulatory Compliance, System Complexity and Extent of Changes
– these help to provide a wide understanding of the risks and implications to the organisation in all of its functions)
 time elapsed since it was last subject to review
 overall audit assessment when it was last subject to review. 
7. We employ a risk-based priority audit planning tool to identify those areas where audit resources can be most usefully targeted. This involves scoring a
range of systems, services and functions across the whole Authority, known as the “Audit Universe” using a number of factors/criteria. The final score,
or risk factor for each area, together with a priority ranking, then determines an initial schedule of priorities for audit attention. Furthermore, our
reliance and successful operation is founded upon the need for strong Information Technology arrangements which support key systems across the
Council, therefore, it is appropriate that an annual review is scheduled in this area based on risk and discussions with management. 
Page 54

Page 55

3 
Argyll and Bute Council – Internal Audit 2023/24 Annual Audit Plan
8. The matrix gives an overall “score” for each area that is used to prioritise audit reviews.                 The audit plan for the year has been created by: 
Page 55

Page 56

4 
Argyll and Bute Council – Internal Audit 2023/24 Annual Audit Plan
Strategic Risks
9. The Strategic Risk Register records the Council’s own assessment of the most potentially damaging risks and their likelihood of occurrence. This
document is used to inform the annual audit plan with identified reviews cross referenced to the strategic risk register. An abridged version of the
strategic risk register is included in appendix 3 for reference. In addition, Operational Risk Registers are reviewed to identify high risk areas and which
we take cognisance of in assessing and scoring the Audit Universe in terms of wider corporate risk which helps to provide a more comprehensive
overview of the organisation.
Resourcing the Plan
10. Internal audit has a core establishment of five members of staff, due to a retirement of one member of staff we are currently operating with four full
time equivalent officers and one contracted member of staff, two of which professionally qualified members of staff.  Available audit days have been
calculated as 768 days (including management and administration time), following the deduction of annual leave, training, a small provision for
sickness, 50 days to deliver scrutiny work and 50 days to deliver the HSCP internal audit function. This 768 days total includes the CIA’s input to audit
reviews and the running of the internal audit team and a contingency in the event of unplanned work. 
11. Given the range and complexity of areas to be reviewed it is important that suitably qualified, experienced and trained individuals are appointed to
internal audit positions. The CIA, in compliance with PSIAS hold appropriate professional qualifications (CIPFA and Institute of Internal Audit). Also
within the internal audit section we have one contracted CIPFA qualified team member, one AAT and CIA qualified member and one training for CIPFA.  
12. Internal audit officers identify training needs as part of their annual appraisal process and are encouraged to undertake appropriate training, including
in-house courses and external seminars as relevant to support their development. 
13. Through an assessment of the mix of knowledge, skills and experience of the audit team, it is considered that the available resources are the minimum
to achieve the work outlined in the plan.
Page 56

Page 57

5 
Argyll and Bute Council – Internal Audit 2023/24 Annual Audit Plan 
Confirmation of Independence
14. PSIAS requires internal audit to communicate, on a timely basis, all facts and matters that may have a bearing on our independence.  We can confirm
that the staff members identified to complete the reviews in the 2023/24 annual audit plan are independent and objectivity is not compromised.
2023/24 Internal Audit Plan
15. Appendix 1 presents the internal audit plan for 2023/24. As our internal audit approach is informed by risks, where appropriate, the plan is cross-
referenced to the strategic risk register contained at appendix 3. Appendix 3 also demonstrates the strategic risks that were subject to audit focus in
2022/23 and those we are projecting to cover in the periods 2023/24 and 2024/25. This provides assurance to the Committee that key strategic risks
are subject to audit coverage over a three year cycle. Note that the projected timescales in appendix 3 are provisional as these may change to reflect
changes in the Council’s risk environment. 
16. Appendix 2 presents the 2023/24 internal audit plan in a different format to provide assurance to the Committee that it provides appropriate coverage
across all the Council’s directorates and head of service’s areas of service delivery. 
Monitoring the Plan
17. Internal audit reports on performance to the Committee on a quarterly basis including full copies of audit reports issued, progress implementing audit
recommendations, performance against agreed performance indicators and a summary of all internal audit activity in the previous quarter.
Paul Macaskill
Chief Internal Auditor
Moira
Weatherstone
Auditor
Mhairi
Weldon
Trainee Auditor
Annemarie
McLean
Trainee Auditor
Leanne
Rennie
Audit Assistant
Page 57

Page 58

6 
Argyll and Bute Council – Internal Audit 2023/24 Annual Audit Plan
Quality Assurance and Improvement Programme
18. The PSIAS require each internal audit service to maintain an ongoing quality assurance and improvement programme (QAIP) based on an annual self-
assessment against the Standards, supplemented at least every five years by a full independent external assessment.
19. The Scottish Local Government Chief Internal Auditors’ Group (SLACIAG) has developed a framework for external assessments to be undertaken by
member authorities of SLACIAG on a broadly reciprocal arrangement utilising a peer review option. The Council’s internal audit team has participated in
this framework and an external validation of its own self-assessment took place during 2017/18 which concluded that we demonstrated overall
compliance with PSIAS with many areas of strong practice.  The next scheduled external assessment is currently in progress with findings reported in
2023.
20. In 2022/23 internal audit carried out an internal self-assessment against PSIAS and prepared a submission for external evaluation, the result of this
evaluation will be reported on when the results have been communicated to the Council. It confirmed the service fully conformed to PSIAS all 14
assessment areas.  The area previously self-assessed as ‘Generally Conforming’ with improvements built into the service’s QAIP has been completed
with the appointment of an Interim Chief Internal Auditor. 
21. The internal audit team review their QAIP on a quarterly basis and report it to the Committee as part of the standard agenda item ‘Internal Audit
Summary of Activities.’ The programme details all improvement activity being progressed by the team.  
Conclusions
22. The pressures, demands and expectations on Local Authorities in Scotland have increased year on year on the backdrop of challenging financial
settlements in which to deliver key services to those across Scotland including Argyll and Bute. This Internal Audit Plan seeks to assist the Council’s
Executive Leadership Team (ELT) and senior managers, together with those charged with governance, specifically, the Council’s Audit and Scrutiny
Committee that assurance in our systems, approach and outcomes meet the needs of the communities we serve whilst achieving  ‘Best Value’ in the
use of our finite resources.
23. The resourcing of this plan is based on the existing staff levels and contractual input in order that a balance of qualified and experienced staff can be
allocated to audit work which matches their skills base and experience. In addition, such resourcing is considered as the minimum essential in which to
deliver this plan across the Council during 2023/24. We would also like to express our gratitude to the Council’s senior managers who have assisted us
in the production of this plan.
Page 58

Page 59

7 
Argyll and Bute Council – Internal Audit 2023/24 Annual Audit Plan 
Appendix 1 – 2023/24 Internal Audit Plan
Directorate
Contact
Service  Audit Title Days High Level Scope Strategic
Risk
Cross Cutting  Continuous
Monitoring 
Programme 
Budgeting 15 Cyclical review of key controls over an 18 month programme of audit
testing.  Council Tax and NDR 20
Creditors 20
Debtors 15
General Ledger 15
Payroll 25
Treasury management 15
VAT 15
Follow–up    45 Compliance 
Pippa Milne Financial Services
Financial Ledger 25
Post implementation review to determine how the system is
operating paying particular attention to feeder systems, reporting
functionality, procedures and training. 
Financial Services Risk Management 15 Assess the adequacy of, and compliance with, the Council’s risk
management arrangements. 
Douglas
Hendry
Education – Wendy
Brownlie Pupil Registration 15 Review the arrangements for the new online registration system for
pupils going to school. 
Education – Wendy
Brownlie Engagement &
Consultation 20
Review the process of engagement and consultation that led to the
establishment of ‘Stretch Aims’ as required by Scottish Government to
close the poverty related attainment gap.
SRR09
Legal and
Regulatory Support
Freedom of Information
(FOI) 20 Review of the process and procedure for the collection and response
to FOI requests and assess the response times across the Council. 
Commercial
Services Compliance Review 15 Review and assess the arrangements for the provision of period
products throughout relevant Council establishments. 
Commercial
Services Building Cleaning 20 Review and assess the arrangements for cleaning across the Council
establishments. 
Kirsty
Flanagan
Roads and
Infrastructure
Services - Jim Smith
Fleet Management 20
Review the arrangements for the authorisation and use of hire
vehicles, establishing whether 'best value' is achieved. 
Page 59

Page 60

8 
Argyll and Bute Council – Internal Audit 2023/24 Annual Audit Plan
Directorate
Contact
Service  Audit Title Days High Level Scope Strategic
Risk 
Roads and
Infrastructure
Services
Pupil and Public
Transport 25
Review the methodology for ASN transport spend; looking at scope
for the potential of merging normal bus services with school/ASN
transport; and the distance from home to school transport. 
Roads and
Infrastructure
Services
Piers and Harbours 20 Review of charging and income arising from piers and harbour dues. 
Development and
Economic Growth Oban Airport 15 Annual review to provide assurance re compliance with operational
manual and assess compliance with the aerodrome operating manual. 
Development and
Economic Growth Planning 25
Review the systems and process in place in respect of Planning
focusing on efficiency of processes and improvements in
communication with customers.
SRR01
Customer Support
Services Human Resources 30
Review the use of causal staff and extensions of these arrangements
and determine whether there are any contractual implications and that
the correct contractual status is reflected on the Payroll system. 
SRR06
Customer Support
Services
Cloud Based Computer
Services 20 Review systems in process in place to support security and data
integrity of Cloud Based services.
SRR11 
Fiona Davies
H&SCP Registration
and Training SSSC Registration 25 Assess the arrangements for evidencing SSSC registration, monitoring
and renewals within the Council. 
H&SCP Client
Funds Client Funds 25 Assess the introduction and implementation of client fund accounts
held on behalf of clients who lack capacity.
SRR07 
H&SCP - Learning
and Physical
Disabilities
Learning and Physical
Disability Care Packages 30 Review of the management and governance of physical and learning
disabilities and mental health high cost packages.
SRR07
Kevin
Anderson
LiveArgyll Establishment visits 35  Cyclical audit approach to assess LiveArgyll establishment’s
compliance with physical controls and compliance with SOP’s. 
Verification
Activity  LGBF Accuracy 10 Accuracy of submission. 
SPT Annual Claim  Accuracy 2 Accuracy of submission. 
Page 60

Page 61

9 
Argyll and Bute Council – Internal Audit 2023/24 Annual Audit Plan
Directorate
Contact
Service  Audit Title Days High Level Scope Strategic
Risk
Education
Maintenance
Allowance
Accuracy 5 Accuracy of submission. 
Stores Stock count 5 Assess stock count procedures. 
Summary of Days
Directorate Contact  Number of Days
2023/2024
Cross Cutting – Continuous Monitoring 185
Pippa Milne 40
Douglas Hendry 90
Kirsty Flanagan 155
Fiona Davies 80
LiveArgyll 35
Verification Activity 22
Contingency 61
Total 668 
Page 61

Page 62

10 
Argyll and Bute Council – Internal Audit 2023/24 Annual Audit Plan
Appendix 2 – 2023/24 Internal Audit Plan by Council Directorate / Head of Service
Pippa Milne Douglas Hendry Kirsty Flanagan Fiona Davies 
Financial Services Education Legal &
Regulatory 
Support
Commercial
Services
Customer Support Roads &
Infrastructure
Development &
Economic
Growth
Health & Social Care
Partnership
Financial Ledger 
Risk Management
Pupil Registration 
Engagement and
Consultation 
Education
Maintenance
Allowance
Freedom of
Information (FOI) 
Compliance
Review 
Building
Cleaning 
Human Resources 
Cloud Based
Computing 
Piers and
Harbours
Income 
Pupil and
Public
Transport 
Fleet
Management
Use of Hire
Vehicles
Planning 
Oban Airport 
SSSC Registration 
Learning and Physical
Disability Care Packages 
Client Funds 
Live Argyll 
Establishment visits 2023-24
Other Activity
NFI – Counter Fraud Team
Follow Up
Local Government Benchmarking Framework 
Page 62

Page 63

11 
Argyll and Bute Council – Internal Audit 2023/24 Annual Audit Plan
Appendix 3 – Strategic Risk Register (Abridged) 
No Risk Gross
Risk Current Mitigation Residual
Risk Approach Key Actions Audit
Coverage
1
Population and
Economic Decline 
Failure to identify
relevant factors
contributing to the
decline and failure
to develop
strategies and
actions targeting
these factors.
20
1. Local outcome improvement plan targets
population and economic recovery
2. Maximise external funding opportunities
3. Economic Strategy
4. Strategic infrastructure plan 
5. Area economic development action plans 
6.Promote and Market Argyll and Bute
7. Maximise social-eco benefits via effective
partnership working
8. Single Investment Plan
9. Refugee sponsorships are fully supported 
10. Temp accommodation is in place for all
refugees
16 Treat
1. Lobbying activity in pursuit of
regional immigration policies and
related strategies
2. Rural Growth Deal Outline
Business Cases and Final
Business Cases to be developed
in 2022/23 and Deal to be signed
late 2022 or early 2023.
3. Preparation of bid to Levelling
Up Fund – preparing for April
2022 in time for submission date
which is still to be confirmed.
4. Settlement Officer post agreed
to be funded 50:50 from
HIE/Council focusing on barriers
to people living in communities,
housing and others.
5. Preparation of a pipeline of
projects across Argyll and Bute in
order to be able to react to any
other bid funding as and when it
is announced.                                 
6. UK Shared Prosperity Fund
Investment Plan for next 3 years
prepared and submitted to
Policy and Resources Committee
on 11th August 2022 - next
iteration will provide further
update. 
2019/20
(Scrutiny) 
2023/24 
Page 63

Page 64

12 
Argyll and Bute Council – Internal Audit 2023/24 Annual Audit Plan
No Risk Gross
Risk Current Mitigation Residual
Risk Approach Key Actions Audit
Coverage
7. Multi-agency approach to
refugee settlement underway
linking with national processes
and agendas.                                         
Page 64

Page 65

13 
Argyll and Bute Council – Internal Audit 2023/24 Annual Audit Plan
No Risk Gross
Risk Current Mitigation Residual
Risk Approach Key Actions Audit
Coverage
2
Condition and
suitability of
Infrastructure &
Asset Base 
Infrastructure and
asset base does not
meet current and
future
requirements and
is not being used or
managed efficiently
and effectively.
16
1.Asset management board 
2.Robust capital planning and monitoring
3. Asset management work plan 
4. Business case modelling including
sustainability, development and strategic
change
5. Intelligence and best practice sharing via
Heads of Property Group.
6. Community Empowerment and
Community Asset Transfer – Arrangements
in place to evaluate and determine requests.
7. Roads Asset Management Plan
8. Status and Options Report
9. R&A Services control hub and joint
operations team 
10. One Council Property Approach
12 Treat
1. Development of capital
strategy in 2022.
2. 'Modern Workspace
Programme will review, engage
and rationalise property
portfolio for future needs of the
Council.  Changes will take place
on phased and town by town
basis. Programme will be running
for 3 years - April 2024 
2020/21 
2021/22 
2022/23
Page 65

Page 66

14 
Argyll and Bute Council – Internal Audit 2023/24 Annual Audit Plan
No Risk Gross
Risk Current Mitigation Residual
Risk Approach Key Actions Audit
Coverage
3
Financial
Sustainability 
Insufficient
resource to meet
current and future
service
requirement.
Budget not aligned
/ does not support
business outcomes
16
1. Longer term financial planning and
financial strategy
2. Income generation activity 
3. Robust budget preparation and budget
monitoring protocols
4. Maintaining adequate contingency with
reserves.
5. Digital transformation
6. Effective workforce planning model
7. Business Outcomes 
8.  Financial Services resilience building
project including knowledge sharing and
development of guidance notes 12 Treat
1. Discussions are continuing in
respect of a change programme
that will include ensuring that
the Council can operate within
its budget (2022 for year
2023/24).
2. Rural Growth Deal Outline
Business Cases and Final
Business Cases to be developed
in 2022/23 and Deal to be signed
late 2022 or early 2023.
3. Implementation of new
general ledger system with
enhanced budget planning and
forecasting capabilities (July
2022)
4. Investment in professional
training through Grow Our Own
Activity.
5. Officers considering
implications of service
concessions guidance and capital
accounting review Terms of
Reference and how that impacts
future financial sustainability.
2019/20
(Scrutiny) 
2020/21 
2022/23 
2023/24 
Ongoing
via
Continuous
Monitoring
4
Governance and
Leadership 
Governance and
leadership
arrangements are
16
1. Administration in place with working
majority
2. Members Seminar programmes
3. Mentoring and Coaching Support for
policy leads and Senior Management
4. Priorities agreed by Council
8 Treat
1. Monitor delivery of BV action
plan (ongoing date)
2020/21
(Scrutiny) 
Page 66

Page 67

15 
Argyll and Bute Council – Internal Audit 2023/24 Annual Audit Plan
No Risk Gross
Risk Current Mitigation Residual
Risk Approach Key Actions Audit
Coverage
not conducive to
effective working
and lead to a lack
of strategic
direction.
5.Corporate Plan sets out objectives
6. Performance Improvement Framework
and Service Planning. 
7. Leadership development programme.
8. Council constitution regularly reviewed
and updated.
9. Established partnership governance
arrangements
10. Scrutiny arrangements in respect of
Police, Fire and Health.
11. Governance arrangements for scrutiny
established
5
Engagement and
Understanding the
needs of the
Community 
The Council fails to
understand service
user needs and
emerging
demographic
trends and does
not align service
delivery to meet
these
12
1. Community Planning partnership
2. Community Engagement Strategy
3.Customer Service Board
4. Operation and development of panels and
forums. Young people’s plan, citizens panel
5. Budget Consultation 
6.Comprehensive Complaints Protocols
7.Demographic and end user analysis  9 Treat
1.Deliver agreed actions in BV3
action plan relating to Work
with Communities and
Community Groups to improve
engagement - September 2022
2022/23 Page 67

Page 68

16 
Argyll and Bute Council – Internal Audit 2023/24 Annual Audit Plan
No Risk Gross
Risk Current Mitigation Residual
Risk Approach Key Actions Audit
Coverage
6
Service Delivery 
Insufficient
resources to ensure
effective service
delivery
9
1. Performance Improvement Framework
2.Service Improvement plans 
3.Argyll and Bute Manager programme
4. Customer needs analysis Protocols
5.Demographic and end user analysis
6.Workforce Planning 
7.Internal and External Scrutiny
Arrangements 
8.Complaints process
6 Treat
1. Monitor progress of
performance mgt project and
implement recommendations 
(Ongoing from Oct 2020 to Sept
2022)
2. Budget approach being
developed to look at longer term
rather than 1 year focus - will be
discussed at first Budget
Working Group meeting in
September.  The approach looks
at duties/powers and
discretionary services.
2021/22 
2023/24
7
Health and Social
Care Partnership 
Failure to deliver
strategic objectives
and integrate
Health and Social
Care services in an
efficient and
effective manner
exposes the
Council, as a key
partner, to
unacceptable
financial and
reputational risk.
20
1. HSCP integration scheme approved by
Scottish government
2. Strategic Plan in place
3. Performance and Financial reporting
arrangements in place
4. Independent audit arrangements in place.
5. Integrated Joint board with elected
member representation including Council
Leader
6.Chief Officer member of ABC Senior
Management Team with co-location of
officers
7. Tripartite leadership agreement
8. Monitoring of HSCP financial position.
9. Medium term Financial Plan in place.
10. Establishment of Strategic and Tactical
Groups with links to HSCP, NHS and
national/regional resilience groups
12 Treat
1. Develop options to deliver
sustainability of future years
budgets (ongoing)
2. Completion of Strategic Plan
which was delayed due to
COVID.
3. Assessment on impact of
COVID on services in short,
medium and long term.
4. Financial assessment of the
financial implications on the
Council of services transferring
to the NCS.
5. Development and regular
review of Economic Recovery
work stream with input from
representatives across the
2019/20 
2020/21 
2022/23 
Assurance
also taken
from IJB
internal
audit
function
Page 68

Page 69

17 
Argyll and Bute Council – Internal Audit 2023/24 Annual Audit Plan
No Risk Gross
Risk Current Mitigation Residual
Risk Approach Key Actions Audit
Coverage
organisation and the Health and
Social Care Partnership. 
8
Civil Contingency &
Business continuity 
Arrangements are
not effective.
8
1. Emergency Planning Test events
2. Critical Activity Recovery Plans
3. Roll out of Community resilience
partnership programme
4. Peer review of major exercises
undertaken to provide external validation of
planning process
5. West of Scotland local resilience
partnership 
6.Cross sector expertise and partnership
working
7. Emergency Management Support Team
(EMST) meetings
8. Training
9. EU Withdrawal Tactical Working Group
with arrangements for reporting to the West
of Scotland Resilience Partnership 
6 Treat
Develop long term test schedule
for DRPs to be presented to the
SMT (December 2021) 
2021/22
Page 69

Page 70

18 
Argyll and Bute Council – Internal Audit 2023/24 Annual Audit Plan
No Risk Gross
Risk Current Mitigation Residual
Risk Approach Key Actions Audit
Coverage
9
Welfare Reform 
Implementation of
welfare reform is
not managed well
resulting in
increased poverty
and deprivation or
short term crisis
12
1. Financial Inclusion and Advice Group
established
2. Joint working with DWP, CPP and other
agencies
3. Child Poverty Planning Group set up and
active
4. Flexible Food Fund created. Supporting
householders in our area with funds and
advice to address food and fuel insecurities 
6 Tolerate
1. Extend Flexible Food Fund
Contract for a further year to
March 2023. 
2. Council, HSCP and third sector
deliver range of 20 Covid related
support projects under the
Flexible Fund banner by March
2023. 
3. Deliver sustainable school
clothing bank across the Argyll
and Bute area by December
2022.
4. One-off top-up payments of
£75 per child issued to School
Clothing Grant recipients by end
of February 2022.
5. Argyll and Bute centric anti-
poverty training delivered to 600
Council, NHS and third sector
staff by March 2022.
6. ""Worrying about money""
leaflet to be issued with Council
Tax bills containing advice and
support for people with money
worries in March 2022. Update
website with information and
support. 
2019/20 
2023/24
Page 70

Page 71

19 
Argyll and Bute Council – Internal Audit 2023/24 Annual Audit Plan
No Risk Gross
Risk Current Mitigation Residual
Risk Approach Key Actions Audit
Coverage
10
Waste
Management 
Unable to dispose
of waste in landfill
sites due to the
implications of the
biodegradable
municipal waste
(BMW) landfill ban
in 2025 20
1. Helensburgh and Lomond waste solution
available via third party offtakers
2. Waste strategy
16 Treat
1. Options Appraisal undertaken
by external consultants and will
be reported to EDI Committee in
December 2022, which will
determine a compliant solution
on the BWN ban by the deadline
of December 2025.
2.  Decision will be required by
Council as to whether they
request a derogation in respect
of waste to end the Waste PPP
Contract.
3.  Officers are keeping a
watching brief on implications of
the Barr Environmental position.
4.  DRS is being reviewed and
officers are keeping a watching
brief on this which is due to be
implemented in August 2023 and
what implications this could have
for the Council.
2021/22
(Scrutiny) 
2023/24
11
Service Delivery -
Cyber Security 
Unable to deliver
services to
customers because
of  failure of ICT
systems following
major cyber
security breach
20
1. ICT Security & compliance officer in post,
producing weekly threat analyses, member
of CiSP
2. PSN and Cyber Essentials Plus
accreditations for corporate network
3. Regular patching regimes in place
4. ICT Disaster recovery plans tested
regularly
5. All critical activities have recovery plans
developed (CARP’s)
15 Treat
1. Review all contingency plans
with updated knowledge from
SEPA and UHI Cyber Attacks.           
2. Work with Scottish
Government Cyber Resilience
Team to test ICT response              
3. Issue regular communications
to raise awareness of
importance of cyber security and
awareness                 
2019/20 
2022/23 
2023/24
Page 71

Page 72

20 
Argyll and Bute Council – Internal Audit 2023/24 Annual Audit Plan
No Risk Gross
Risk Current Mitigation Residual
Risk Approach Key Actions Audit
Coverage 
6. Review the issuing of regular
communications to raise awareness of
importance of cyber security and awareness
again
4. Enforce password changes
when found to be weak                  
5.  Cyber Security Resilience
Exercise planned for late
February 2022.                 
6. Continued close review of
disaster recovery plan and
associated tests, finalise and test
incident response procedure,
and review of mirroring between
the 2 data centres (monthly at
ITMT) and backup
7. Review and progress
requirements for Education
Network to achieve CE+
accreditation.
12
Cost of Living Crisis 
The Council are
unable to respond
to the implications
arising from the
'Cost of Living'
crisis
25
1. Financial stability and support to HSCP
2. Social Welfare and Poverty Funding
assistance.
3. Focused support and multi-agency
approach where risk is highlighted
4. Monitoring of trends in service use to
high light any significant change as a result
of financial hardship
5. Targeted measures  - for example to
those receiving Council Tax reductions - via
Gift Cards and Flexible Food and Fuel Fund
12 Treat
1. Review and monitor changes
in demand for key services which
correlate to personal effects
arising from financial distress.
2. Assessment of the 'Cost of
Living' crisis on wellbeing and
service capacity/sustainability -
December 2022 
Page 72

Page 73

21 
Argyll and Bute Council – Internal Audit 2023/24 Annual Audit Plan
No Risk Gross
Risk Current Mitigation Residual
Risk Approach Key Actions Audit
Coverage
13
Impact of Climate
Change 
The Council or
communities are
overwhelmed by
severe or more
frequent flooding,
landslides, rainfall,
storms, sea level
changes or hot
weather events
due to changes in
global temperature
caused by climate
change
25
1. Continued delivery of Council De-
Carbonisation Plan 
2.  Civil Contingencies Manager liaising/
collaborating with Regional Resilience
Partnerships and other resilience partners in
terms of storm event, hot weather events,
cut off communities, landslides etc.
3. Development and delivery of an
integrated approach to decarbonisation and
adaptation of Argyll and Bute as a Region via
Community Planning Partnership
4. Roads & Amenity Services continue to
develop asset management plan and
address strategic risks in terms of rising sea
levels, bridge repairs, critical infrastructure
vulnerability
12 Treat
1. Review of De-Carbonisation
Plan December 2024
2. Consideration of all Council
Papers with climate change as
consideration / implications -
ongoing
3. Review scoring of business
cases and pipeline of strategic
projects with enhanced climate
change considerations
2021/22 
Page 73

Page 74

This page is intentionally left blank

Page 75

ARGYLL AND BUTE COUNCIL 
FINANCIAL SERVICES
AUDIT AND SCRUTINY COMMITTEE 
16 MARCH 2023
UNAUDITED ANNUAL ACCOUNTS 2022-23  
1 EXECUTIVE SUMMARY 
1.1 This report advises the Audit and Scrutiny Committee of the plans in place for
financial year end 31 March 2023 and the preparation of the Council’s Unaudited
Annual Accounts for 2022-23. 
1.2 The appendices to the report outline the timetables for the closure of the Council’s
2022-23 General Ledger, the Social Work Closedown and the Annual Accounts
Preparation Plan. 
1.3  The Committee is asked to note that plans are in place to prepare the Council’s
Annual Accounts, consistent with the Accounting Code of Practice and submit
them to Council prior to 30 June 2023. 
Page 75 Agenda Item 10

Page 76

ARGYLL AND BUTE COUNCIL 
FINANCIAL SERVICES
AUDIT AND SCRUTINY COMMITTEE 
16 MARCH 2023
UNAUDITED ANNUAL ACCOUNTS 2022-23  
2. INTRODUCTION 
2.1 This report advises the Audit and Scrutiny Committee of the plans in place for
financial year end 31 March 2023 and the preparation of the Council’s Unaudited
Annual Accounts for 2022-23. 
2.2 Processes have been established to ensure that the Annual Accounts are
prepared in accordance with International Financial Reporting Standards (IFRS)
on an on-going basis. There are no major changes in accounting practice for
2022-23. 
3 RECOMMENDATIONS 
3.1 To note that plans are in place to prepare the Council’s Annual Accounts,
consistent with the Accounting Code of Practice and submit them to Council prior
to 30 June 2023. 
4 DETAIL 
4.1 “An Audit Committees – Practical Guidance for Local Authorities” has been issued
by the Chartered Institute of Public Finance and Accountancy (CIPFA). This
suggests that Audit Committees should have an overview of the plans made for
preparation of the Council’s Annual Accounts. 
4.2  A set of instructions for the end of the financial year have been drafted. These
cover year-end close down of the Council’s financial systems and the preparation
of a set of accounts in line with professional and legislative requirements.  These
are included within appendices 1 and 2.
4.3  The project plan included with the instructions is detailed and includes the
following milestones:  
• Capital expenditure and treasury management revenue accounts
completed by 28 April 2023.
• Revenue expenditure, creditors, debtors, accruals and prepayments
completed by 21 April 2023.
• Review and adjustments to ledger and central department cost allocations
completed by 19 May 2023.
• Council Tax and NDR entries completed by 12 May 2023.
• Agreement of inter-group balances with Live Argyll and associated journals
processed by 28 April 2023.
• Preparation of Unaudited Annual Accounts including report by Section 95
Page 76

Page 77

Officer by 3 June 2023.
• Unaudited Annual Accounts considered by a meeting of the Audit and
Scrutiny Committee on 15 June 2023.
• Unaudited Annual Accounts considered by a meeting of the Full Council on
29 June 2023.
• Submission of Unaudited Annual Accounts to Accounts Commission by the
statutory deadline of 30 June 2023.
4.4 Previously external Audit has been satisfied with the quality of working papers
and general arrangements for preparation of the Annual Accounts. The plan
should result in Financial Statements prepared by the required deadline of 30
June 2023 and with supporting documentation of a standard to enable completion
of the audit by 30 September 2023. 
4.5 Whilst there are no major changes in accounting practice for 2022-23,
amendments to IFRS 16 Leases were planned to take effect from 01 April 2022,
although this has been delayed until 01 April 2024. To ensure compliance with the
new standard, preparatory work is underway to make sure the Council is ready for
implementation take effect on 01 April 2024.
5. CONCLUSION
5.1 The timescales are in line with the previous year which should ensure that the
Annual Accounts are completed on time and that the working papers meet Audit
Scotland’s requirements.
6 IMPLICATIONS
6.1 Policy None at present.
6.2 Financial  None at present.
6.3 Legal  None at present.
6.4 HR  None at present.
6.5 Fairer Scotland
Duty 
None at present.
6.5.1 Equalities None at present.
6.5.2 Socio-Economic
Duty
None at present.
6.5.3 Islands Duty None at present.
6.6 Climate Change None at present.
6.7 Risk None at present.
6.8 Customer Service None at present.
Kirsty Flanagan
Executive Director / Section 95 Officer
21 February 2023
Policy Lead for Financial and Commercial Services - Councillor Gary Mulvaney
For further information please contact Anne Blue, Head of Financial Services, on
01586-555269.
Page 77

Page 78

APPENDICES
Appendix 1 – Year End Instructions including General Ledger Closedown and 
Accounts Preparation Plan.
Appendix 2 - Schedule for Payroll, Overtime and Travel accruals.
Appendix 3 - Health and Social Care Partnership Closedown Timetable 
Page 78

Page 79

Year End Instructions & General
Ledger Closedown Timetable
Financial Year
2022-2023 
Page 79

Page 80

YEAR-END INSTRUCTIONS – GENERAL LEDGER CLOSEDOWN
2022/2023 FINANCIAL YEAR 
Section   Page    
1 GENERAL  2
2 LIVE ARGYLL  2
3 REVENUE PAYMENTS AND ACCRUALS 
3.1 Creditor Invoices 2 
3.2 Accruals 3 
3.3 Invoices relating to 2022/2023 awaiting credit notes 3 
3.4 PECOS e-Procurement System 3   
4 SUNDRY DEBTORS & INCOME 
4.1 Sundry Debtors 4 
4.2 Cash Receipting 4 
4.3 Banking of Income 4 
4.4 E-Income Journals and Manual Income Journals 5 
4.5 Imprests 5    
5 CAPITAL 
5.1 Capital Expenditure and Capital Journals 5 
5.2 Capital Financed from Current Revenue 5    
6 JOURNALS 
6.1 Journals 6    
7 INTERNAL RECHARGES 
7.1 Old Year Internal Recharges 6 
7.2
7.3
Mail and Print Room Recharges
Clearance of Account 29901
7
7
8 STORES/WORK IN PROGRESS 
8.1 General 7 
8.2 Stock Count 7 
8.3 Work in Progress 7    
9 CONTROL AND SUSPENSE ACCOUNTS 
9.1 Control Accounts 8 
9.2 Suspense Accounts 8    
10 PAYROLL 
10.1 General 8 
10.2 Payruns 8 
10.3 Travel Claims 9    
11 AMENDMENTS TO HIERARCHIES / COST CENTRES DURING YEAR END PERIOD 
11.1 Amendments 9   
APPENDIX 1 – 2022/23 General Ledger Closedown Timetable 
APPENDIX 2 -  Schedule for Payroll, Overtime and Travel Accruals 
APPENDIX 3 - Health and Social Care Partnership Closedown Timetable    
Page 80

Page 81

1 GENERAL 
1.1 
1.2
Appendix 1 gives the detailed year end timetable for the closedown of the general ledger.  Achievement of
the deadlines highlighted in green are critical to achieving a ledger closedown of 26 May 2023.  It is vital
that any slippage from these deadlines is identified as soon as possible and brought to the attention of
Morag Cupples so that remedial action may be taken. 
Appendix 3 gives the closedown timetable for the Health and Social Care Partnership which will enable
figures to be agreed with the Argyll and Bute Integrated Joint Board (IJB) in respect of the Social Work
Service.  The deadline for reporting an agreed figure back to Health for inclusion in their year-end figures is
Monday 24 April 2023. 
1.3 Year-end instructions specific to Development and Infrastructure Services will be issued from their
Departmental Financial Services Team. 
2 LIVE ARGYLL 
2.1 
2.2 
2.3 
2.4
In general, unless otherwise stated below, the timescales set out within these instructions for the Council
also apply to Live Argyll. 
Specifically note that any transfers of actual income/expenditure or budget between the Trust and the
Council must be processed in line with the deadlines set out for the Council journals, i.e. 28 April, or 6 April
if they contain VAT. 
As internal recharges are not processed for Live Argyll, the debtors deadline of 22 March needs to be
adhered to for transactions of this nature otherwise they will require to be accrued. 
Diane McMillan will collate all invoices and email to creditors eliminating the need for headers.  Invoices
relating to the 2022/2023 financial year should be E-mailed to creditors@argyll-bute.gov.uk no later than
5pm on Friday 24 March for processing through the payables ledger by 30 March. In doing so, no invoices
relating to 2023/2024 will be sent to creditors prior to w/c 3 April 2022.  
3 REVENUE PAYMENTS AND ACCRUALS 
3.1  Creditor Invoices (Manual Batches) 
Invoices relating to the 2022/2023 financial year should be E-mailed to creditors@argyll-bute.gov.uk no later
than 5pm on Friday 24 March for processing through the payables ledger by 30 March. All old year invoices
must be batched separately and be clearly marked as “2022/2023”.   
Invoices for 2023/24 should not be sent to Creditors until after Monday 3rd April 2023, except in
circumstances where an Urgent payment is required. 
To enable figures to be agreed with the Argyll and Bute Integrated Joint Board (IJB) in respect of the Social
Work Service, Health and Social Care Partnership invoices should be E-mailed to the creditors@argyll-
bute.gov.uk by 5pm on 24 March.   
Page 81

Page 82

3.2 
3.3 
Accruals 
All old year invoices received by departments which have failed to make the 5pm Friday 24 March deadline or,
the PECOS deadlines detailed at section 3.4, will require to be accrued.  In addition, any goods or service
received prior to 1 April but not yet invoiced must also be accrued.  These items must be input into the accrual
templates which will be emailed to the Departmental Financial Services Teams at the beginning of March for
distribution.     
The Departmental Financial Services Teams will check, review and collate their respective departmental
accruals before returning templates to the Finance Support Team for processing.  Each Departmental Financial
Services Team will agree with their respective department a timeline for the return of all accrual templates
and supporting documentation.   
Departmental Financial Services Teams must return all accrual templates and, make available, supporting
documentation to the Finance Support Team, Kilmory by 5pm on Friday 14th April at the latest. 
In order to comply with Audit requirements, all accruals greater than £5,000 must have supporting
documentation.  Auditors may require to understand the basis of the accrual and may test randomly. 
Acceptable supporting documentation should come in the form of: 
• Copy invoice which clearly provides proof of delivery of goods or services on or before 31 March
2023.
• Delivery note dated on or before 31 March 2023.
• Other documentation which provides evidence that the goods or services were provided on or
before 31 March 2023. 
Orders are not acceptable documentation as they do not show when the goods or services were provided.  If
you are in any doubt as to what documentation should be provided, please contact your Departmental
Financial Services Team. 
The Finance Support team will have the accrual templates uploaded by close of play on 21 April. If
Departments receive invoices of a material value after their accrual deadline of 14 April, please advise your
Financial Services Departmental contact, who will make a determination in conjunction with Financial Services
Management as to whether an additional accrual should be processed. 
Invoices relating to 2022/2023 awaiting Credit Notes 
If the credit note has not been received in time for the last payment run, and provided the supplier is used
regularly, the invoice should be passed for payment and the credit note should be accrued using the invoice
accruals template, but shown in the credit column of the accruals template.  If the supplier is not used regularly,
the invoice should be held awaiting the credit and both the invoice and credit note will require to be accrued. 
3.4 PECOS e-Procurement System 
All PECOS Invoices are to be submitted to Creditors (pecosinvoices@argyll-bute.gov.uk) by 5pm on Friday 24th
March.  Creditors will ensure all PECOS invoices are keyed to PECOS by 5pm on Tuesday 28th March.  
All PECOS users must ensure unpaid invoices (mismatches or receipt required) are cleared by 5pm on
Wednesday  29th March 2023 to allow Creditors to prepare for the final pay run of the year. 
All PECOS users must also ensure all goods/services/works received/completed within the old financial year
are receipted on the system by 5pm on Thursday 30st March 2023.  
No access to PECOS will be available on Friday 31st March 2023 
A PECOS Accrual report will be run by the Procurement Team on Friday 31st March 2023 This will be issued to
the Finance Support Team where the data will be manipulated to include the department responsible.  This
will then be returned to the PECOS Team for issue out to departments on Tuesday 4th April 2023.    
• All entries on the PECOS report should be checked by services and accrued where necessary.   
• Services will need to ensure that there is sufficient justification in a comments column that will be
included on the PECOS report.   
Page 82

Page 83

• If the order is for over £5,000 then back-up, in addition to the PECOS system report, will be required
and should be submitted to your respective Departmental Financial Services Team by 14 April 2023
at the latest. 
• These accruals should be entered onto the main departmental accruals template, which should be
completed and returned to the Departmental Finance team.   
Any unpaid invoices (mismatches or receipt requirements) cleared after 5pm on Wednesday 29 March 2023
will be automatically paid from the new financial year.   If you require this to be paid from the old financial
year, you require to mark it up on the accrual report accordingly.   
PECOS will continue to operate as normal from Monday 3rd April 2023 but all invoices processed  after this
date will be held, unpaid, until the first pay run of the new financial year restarts in early April (planned as the
6th April) and all payments will be made from the new financial year. 
Departments should take the opportunity to review and action all PECOS reports; Unpaid and Open Orders
Reports, they received weekly/monthly in the lead up to year-end and rectify as many of the housekeeping
issues as possible.  Doing this will greatly reduce the number of orders you need to review on your accrual
report. 
Note:  
Review all open orders on the provided report and: 
• Close any orders where you are satisfied that the order is complete with no outstanding items or
invoices due.
• Receipt any orders completed.
• Clear any mismatches to allow the payment of the invoice or request a credit note if the invoice is
incorrect. 
• Chase up any missing orders.
• Chase up any outstanding invoices.
• Cancel any orders no longer required.   
4 SUNDRY DEBTORS AND INCOME 
4.1 Sundry Debtors 
The Debtors Section of Financial Services Team, Campbeltown, must receive debtors account input forms,
relating to 2022/23, by 22 March.  If you have local input of debtor accounts, all accounts for financial year
2022/23 must be input by 29 March. All such accounts must have a service date of 31 March or prior.    Any
accounts for the old year that are entered on or after 1 April should have the correct service date entered,
even if prior to 31 March.  These accounts will have to be included within the income accruals template. 
New year sundry debtors should be clearly marked 2023/2024 and these will be entered into the sundry debtor
system in the new financial year.   
4.2 Cash Receipting System 
The cash receipting reports for the 31 March to 1 April will all be processed into 2022/2023 financial ledger. 
All income received from Saturday 1 April onwards, will be processed in the 2023/2024 financial ledger. 
Any income processed through cash receipting for the cash in transit period will be accrued by the cash
receipting team. 
4.3  Banking of Income 
All offices/facilities that collect money and receipt it via the Area Offices should ensure that all money relating
to financial year 2022/2023 is taken to the Area Office by 4pm on Friday 31 March. 
For offices/facilities that use the bank, again, all money relating to financial year 2022/2023 should be banked
before close of business on 31 March. 
Page 83

Page 84

It is possible that further monies may be received on that day, after the final banking.  If this is the case, these
amounts will require to be included on the income accruals template and contact should be made with the
appropriate Financial Services Departmental Contact. 
4.4 E-Income Journals and Manual Income Journals 
Staff who complete E-Income Journals (for cash received other than cash processed through the cash
receipting system) should do so on 31 March.  Completed E- Income journals should be e-mailed on 31 March
to the Cash Section (Financial Services).  All other manual income journals should be posted on 31 March to
arrive at the Cash Section (Financial Services) no later than Wednesday 5th April. 
Separate E-Income journals should be completed for income received from 1 April onwards – this will be
processed in financial year 2023/2024.  E-Income journals and manual income journals should state clearly
which financial year the income on that journal relates to. 
4.5 Imprests 
The Creditors Section (Financial Services) will issue imprest certificates/returns to imprest holders by Monday
27 February.  Certificates for all establishments, including schools, should be returned to the Creditors
Section (Financial Services), Campbeltown as soon as possible after 31 March but no later than Friday 14
April.     
5 CAPITAL 
5.1 Capital Expenditure and Capital Journals 
All capital invoices relating to 2022/23 should be sent to the Campbeltown Creditors section or E-mailed to
creditors@argyll-bute.gov.uk as soon as they are received, but no later than 5pm on Friday 17 March.   
All old year capital invoices received by departments but which have failed to make the 17 March deadline will
require to be accrued.  In addition, capital expenditure incurred prior to 1 April but not yet invoiced /
certificated must also be accrued. 
These items must be input into the capital accruals template which will be emailed to the departmental capital
programme contacts at the beginning of March.  The template should be E-mailed to linda.taylor@argyll-
bute.gov.uk by 5pm on Tuesday 4 April.  All capital accruals must have supporting documentation which proves
that the expenditure was incurred prior to 1 April. 
5.2 Capital Financed from Current Revenue (CFCR) 
Where expenditure has been incurred on capital items/assets but funded through the revenue budget, this
needs to be identified and a journal to transfer the expenditure to capital put through.  A template will be e-
mailed to the departmental capital programme contacts, asking for information on any CFCR expenditure
incurred during 2022/23. 
The template should be E-mailed to linda.taylor@argyll-bute.gov.uk by 5pm on Wednesday 1 March 2023. 
Page 84

Page 85

6 JOURNALS 
6.1 Departments will be allowed to process their own journals up to 28 April.  Only material adjustments will be
processed by the Finance Support Team after this date with agreement of Financial Services Management. 
To reflect a normal period end at the end of March, departments will be able to process normal period end
journals through the March period in the ledger until Monday 3rd April.  After that, all journals processed by
departments must be processed through the “adjust” period and not through “March”.  Care should be taken
over which period is selected as Adjust and April will all be open. 
Journals containing VAT which relate to 2022/2023 should not be processed at all by any staff after 06 April
without consulting Sandra Coles (Financial Services).  Sandra will be preparing the VAT return for March once
the payables ledger is closed on 31st March and if there are any VAT adjustments made to the old year after
this date they will be missed through the VAT return.  
Any journals containing capital codes should follow the deadlines set out in Section 5.1 above i.e. 5pm on
Friday 17 March. 
7 INTERNAL RECHARGES 
7.1 Old Year Internal Recharges 
Over £1,000 
Internal recharges will be processed by the Finance Support Team. 
On 1 March, the Finance Support Team will contact the receiving department of any Internal Recharges that
are still outstanding on the system dated 31 January or earlier. These should be returned to the Finance
Support Team by 24 March for processing. 
Creators of invoices in each section can view all invoices raised against their service that are still outstanding
by using the “View Recharges Allocated to my Service” choice on the Main menu. 
The final date for producing internal recharges for 2022/2023 is Friday 24 March. These should be sent to
receiving departments for coding immediately. 
Receiving departments should send all internal recharges to the Finance Support Team, Kilmory as early as
possible, but no later than 1pm on Wednesday 29 March. These will be processed and coded into March on
Friday 31 March. 
Any remaining accounts still outstanding will be cleared from the system on 24 March to the cost codes
detailed below. A list of charges that have been cleared will be provided to the receiving department. 
The following customer department accounts will be debited/credited as appropriate:   
Executive Director – Douglas Hendry - Education  E2000010000.29901  
Financial Services  C1283010000.29901  
Executive Director – Douglas Hendry – non Education 80000000000.29901  
Executive Director – Kirsty Flanagan 70000000000.29901  
Health & Social Care Partnership 50000030000.29901   
Under £1,000 
The journal prepared by each department for any Internal recharges less than £1,000 for the March period
should be sent to the Finance Support Team by 12 noon on Wednesday 5 April and will be uploaded into the
ledger on Thursday 6 April. 
Page 85

Page 86

7.2 Mail and Print Room Recharges 
The monthly mail and print room charges for the March period should be sent to the Finance Support Team
by 12 noon on 5 April and will be uploaded into the ledger on Thursday 6 April 2023. 
7.3 Clearance of Internal Recharges Clearance Account No 29901 
Departmental journals should be raised to clear the 29901 accounts.  However, it is expected that departments
will make all attempts to clear outstanding invoices before any transfer to the 29901 accounts can take place. 
It is the responsibility of each department to ensure recharges coded to 29901 are cleared prior to Friday 21st
April.   
8 STORES/WORK IN PROGRESS 
8.1 General 
Departments should inform their Principal Accountants as soon as possible if they consider that they will have
any difficulty in complying with the following stock and work in progress working paper requirements.   
Internal audit will be present at selected stock counts and will be performing sample checks.  External audit
may also be present. 
8.2 Stock Count 
All Development and Infrastructure Services (Salt and Fuel), and Social Work stores must perform a full physical
stock count on or around 31 March.  Instructions will be issued to all Development and Infrastructure Services
locations with stores by 1 March by the Development and Infrastructure Services Financial Services Team.  The
Social Work Departmental Finance Team will issue instructions for the Social Work stores. 
Stock certificates must be completed by Roads and Infrastructure Services and Social Work Services and sent
to their Departmental Principal Accountant by Thursday 06 April.  These certificates should be accompanied
by detailed working papers including; 
• Original stock count working papers. 
• Final priced stock sheets (quantity x price) totalled to give stock value for each store. 
• Details of obsolete stock and any stock provisions / write-downs. 
The Principal Accountants should retain all reviewed certificates and the above stock working papers for
inclusion in the year-end working paper files for the external auditors by Friday 14 April. Where possible
electronic working papers should be provided. 
8.3 Work in Progress – Roads and Lighting Operational Holding Account 
Development and Infrastructure Services are required to prepare a valued list of work in progress for the Roads
and Lighting Operational Holding Account by 3 May and this should be passed over to the Principal Accountant
– Development and Infrastructure Services for review.   
Detailed listings at works order level of work in progress for the Roads and Lighting  Operational Holding
Account should be retained (preferably in electronic format) to back up the work in progress figure processed
through the ledger.   
Page 86

Page 87

9 CONTROL AND SUSPENSE ACCOUNTS 
9.1 Control Accounts 
A responsible person has been identified for each control account in the general ledger.  Reports will be issued
on 03 April to the relevant Finance Contact, giving the current balance on each control account along with a
“Carry Forward of Control Account Balance” form.  The balance in the control account either requires to be
cleared to zero or carried forward to the next financial year.   The Finance Contact will complete the
appropriate forms once all journal entries have been processed and ensure they are signed off by the
responsible person.  If a carry forward is required, justification and a reconciliation must be attached to the
carry forward form.   Care should be taken to ensure that any balances to be carried forward are correct and
represent a genuine debtor or creditor.   
The “Carry Forward of Control Account Balance” form should be sent to the Finance Support Team (Kilmory)
by Friday 28 April.   
All clearance and adjusting journals will be processed by the Finance Support Team by Friday 5 May.   
The Revenue and Benefits Finance Manager has until Friday 12 May to clear the “raw cash” control account
balances in conjunction with processing of year-end council tax and NDR journals. 
9.2 Suspense Accounts 
A responsible person has been identified for each suspense account in the general ledger.  Reports will be
issued on 03 April giving the balance on each suspense account. This balance requires to be cleared.  Under no
circumstances should transferring to another suspense account clear the balance. All clearance journals for
suspense accounts other than payroll suspense must be completed and input into the ledger by Friday 21 April. 
Entries from the monthly Pay07 payroll run which hit the payroll suspense should be cleared by 14 April and
cleared by 27 April for the Pay10 teachers’ payroll run. This will enable the payroll accruals to be prepared and
processed through the ledger. 
10 PAYROLL 
10.1 
10.2 
General 
Deadlines for the receipt of timesheets, expenses and other payroll input from departments will follow normal
payroll deadlines.  Separate guidance will be issued from Financial Services/Payroll, Campbeltown prior to the
year-end. 
Any additional questions on payroll and travel claims should be directed as follows: 
Payroll – 01586 555211
Travel Claims– Malcolm Bannatyne – 01586 555256 
Payruns 
Details of the method of calculating payroll accruals are noted below and accruals will be processed by the
Financial Services Finance Support Team.  Appendix 2 gives full details of the year end payroll dates and
accruals required. 
Proportion Accrued
Payrun Week/Month No Payroll Overtime Travel &
Subsistence
Pay 07 Monthly  01 16/31sts 100% 100%
Pay 10 Teachers  01 100% part
time hrs *
N/A 100% 
* Part time teachers’ hours and enhancements relating to March will be 100% accrued. 
Page 87

Page 88

10.3  Travel Claims 
Staff travel claims are mainly submitted via the “MyView” on-line system. The year-end deadlines for
“MyView” travel and expense claims are as follows: 
• PAY 07 Mth 12 - must be submitted by 21 February 2022 & authorised by 28 February 2022.
• PAY 07 Mth 1 - must be submitted by 24 March 2023 & authorised by 31 March 2023.
• PAY 10 Mth 1 - must be submitted by 14 April 2023 & authorised by 20 April 2023. 
The above cut-off dates for travel and expense claims over the year-end period will be clearly displayed on the
“MyView” system when staff log in. 
All other travel expense claims should be sent to the Creditors Section no later than the above authorised date
for the appropriate payroll. 
Care should be taken to note the dates for receipt of travel and expense claims at the creditors section in order
to ensure that as much travel and expenses as possible for the period up to 31 March 2023 is incorporated
within the pay run that will be accrued.  It is essential, for accrual purposes, that all business mileage incurred
up to and including 31 March is incorporated into one claim and any business mileage incurred on or after 1
April is entered onto a separate claim. 
If a travel claim is not going to meet the creditor section’s deadline, then the department will require to accrue
the travel claim manually.  In this instance, it is still preferable to have two separate travel claims for before
and after the 31 March, for ease of accrual preparation. 
It is imperative that leased car users enter their final milometer reading onto their 2022/2023 claim. Details of
Essential and Leased car users business mileage must be communicated to the Inland Revenue and is used to
calculate their tax, so it is very important that the figures given are accurate and relate to the correct financial
year. 
11 AMENDMENTS TO HIERARCHIES / COST CENTRES DURING YEAR END PERIOD 
11.1 Any cost centre/account codes that have been used in the period year 2022/2023 that have to be disabled
for the year 2023/2024 will not be processed until after the Support Service model has been run through the
ledger and the analytical review has been completed. 
The control sheets should be E-mailed to astrid.ronald@argyll-bute.gov.uk and will be held until the changes
are made.  The period that this affects is 31 March 2023 – 31 May 2023.   
Page 88

Page 89

Appendix 1 - General Ledger Closedown Timetable
Work Area Task
No. Task Description Lead Responsibility
2022-23
Undertaking Task
2022-23 Completion Date 2022-23
1. Capital Expenditure
Processing
1 CFCR template returned to Financial Services Morag Cupples Departments 01/03/2023
2 Processing of CFCR journals by Finance Support Team Morag Cupples Finance Support Team 03/03/2023
3 Deadline for capital payments to Creditors Section Morag Cupples Departments 17/03/2023
4 Processing of final external capital payments Morag Cupples Creditors Section 20/03/23 - 22/03/23
5 Roads Capital Measures Morag Cupples Departments 22/03/2023
6 Final Payment Run Processed Capital Morag Cupples Creditors Section 23/03/2023
7 Year end journals of transfers to/from revenue accounts Morag Cupples Linda Taylor 22/03/2023
8 Property Fee Charges Processed and Infrastructure Design
Billing Run
Morag Cupples Linda Taylor 04/04/2023
9 Ledger checked daily for capital expenditure Morag Cupples Linda Taylor 03/04/23 - 28/04/23
10 Deadline for capital accruals template/CFCR
template/journals to Financial Services (Whitegates)
Morag Cupples Departments
04/04/2023
11 Processing of final external capital payments/accruals Morag Cupples Linda Bain 06/04/2023
12 Capital expenditure processing complete Morag Cupples Linda Taylor 06/04/2023
2. Fixed Assets
Non-Current Assets
Available for Sale
13 Capital expenditure final download from ledger Morag Cupples Linda Taylor 06/04/2023
14 Allocate Capital Grant Morag Cupples Linda Taylor 06/04/2023
15 Allocation of balance sheet codes to mass allocation journal Morag Cupples Linda Taylor 11/04/23 to 28/04/23
16 Mass allocation processed Morag Cupples Linda Bain 28/04/2023
17 Capital expenditure complete Morag Cupples Linda Taylor 28/04/2023
Depreciation/Property Plant
and Equipment Processing
18 Revaluation of Properties by Estates - including supporting
evidence of assets classified for sale
Morag Cupples Estates 17/04/2023
19 Update asset register for new
assets/additions/disposals/transfers
Morag Cupples Linda Taylor 02/05/23 to 05/05/23
20 Run depreciation/impairment charges and process journal Morag Cupples Linda Taylor 05/05/2023
21 Update Asset Register for Revaluations Morag Cupples Linda Taylor 08/05/23 - 09/05/23
22 Process balance sheet depreciation/revaluation journals Morag Cupples Linda Taylor 10/05/23 - 12/05/23
23 Reconcile asset register to ledger Morag Cupples Linda Taylor 15/05/23 - 18/05/23
24 Capital Accounting Entries Complete Morag Cupples Linda Taylor 18/05/2023
Page 89

Page 90

Appendix 1 - General Ledger Closedown Timetable
Work Area Task
No. Task Description Lead Responsibility
2022-23
Undertaking Task
2022-23 Completion Date 2022-23
3. Loan Charges 25 Complete interest on revenue balances Moira Miller Sandra Coles 24/03/2023
26 Complete PSTM Reconciliations Moira Miller Sandra Coles 05/04/23 to 12/04/23
27 Accrual of Borrowing Interest and Expenses Moira Miller Sandra Coles 07/04/23 to 14/04/23
28 Accrual of Investment Interest and Expenses Moira Miller Sandra Coles 07/04/23 to 14/04/23
29 Financial Services expense allocation Moira Miller Sandra Coles 14/04/2023
30 Provision of capital repayment figures for house loans Moira Miller Duncan MacBrayne 27/03/23 to 06/04/23
31 Calculate weighted capital expenditure in year Anne Blue Moira Miller 12/04/2023
32 Input annuity rate loan charges model and calculate loan
charges
Anne Blue Moira Miller 12/05/2023
33 Process loans charges/SMGFB (Statement of Movement in
General fund) journals
Moira Miller Sandra Coles 14/04/2023
34 Loans fund revenue account (ensure nil) Moira Miller Sandra Coles 18/05/2023
35
Management review of loans fund calculations after all
journals processed through ledger Kirsty Flanagan Anne Blue 15/05/23 - 16/05/23
36 Loans Charges Complete Anne Blue Moira Miller 18/05/2023
4. IFRS Pensions Accounting
- Year End Accounting
Entries
37 Complete & submit Organisation Report Request Form to
Hymans
Anne Blue 01/03/2023
Page 90

Page 91

Appendix 1 - General Ledger Closedown Timetable
Work Area Task
No. Task Description Lead Responsibility
2022-23
Undertaking Task
2022-23 Completion Date 2022-23
38 IFRS Pensions Report Received from Actuaries (Hymans
Robertson)
Anne Blue Anne Blue 31/03/2023
39 Check reasonability of data in report Lorna Semple/Elizabeth
Moller
Lorna Semple/Elizabeth
Moller
17/04/2023
40 Calculate pensions entries in ledger Lorna Semple/Elizabeth
Moller
Lorna Semple/Elizabeth
Moller
17/04/2023
41 Process pensions entries in ledger Lorna Semple/Elizabeth
Moller
Lorna Semple/Elizabeth
Moller
17/04/2023
42 Check no bottom line impact on general fund Lorna Semple/Elizabeth
Moller
Lorna Semple/Elizabeth
Moller
17/04/2023
43 IFRS Pension Entries Complete Anne Blue Lorna Semple/Abbie
MacIver
17/04/2023
5 .Creditor Payments 44 Deadline for Health and Social Care Partnership Invoices to
Creditors
David Forshaw / Malcolm
Bannatyne
Departments 24/03/2023
45 Departments processing old year invoices Departments Departments 24/03/2023
46 Deadline for passing invoices to Finance (Campbeltown) Malcolm Bannatyne Departments 24/03/2023
47 Processing of final revenue payments 2022-23 Malcolm Bannatyne Creditors Section 30/03/2023
48 Final payment run processed Malcolm Bannatyne Creditors Section 30/03/2023
Payables re-opens for processing to April Malcolm Bannatyne Creditors Section 03/04/2023
49 Production and processing of final feeders to road costing Malcolm Bannatyne Creditors Section 31/03/2023
50 Closure of March 2021 Period (5pm) Mary McCallum Astrid Ronald 31/03/2023
51 Reconciliation of Core Payables Liability Mary McCallum Duncan MacBrayne 31/03/2023
52 VAT return completed Moira Miller Sandra Coles 11/04/23 - 21/04/23
53 Creditor Payments and VAT completed Mary McCallum Astrid Ronald 21/04/2023
6. Health and Social Care
Integration
54 Agree final outturn position with Chief Financial Officer of
Integrated Joint Board
David Forshaw Lorna Semple/Abbie
MacIver
24/04/2023
7. Revenue
Accruals/Prepaid
Expenditure
55 Accrued/Prepaid expenditure templates issued to
departments
Mary McCallum Astrid Ronald 01/02/2023
56 Departments complete accrued / prepaid expenditure
templates - this to be collated and checked by Departmental
Financial Services Teams
Principal Accountants Departments /
Departmental Support
Teams
20/03/2023 - 14/04/2023
Page 91

Page 92

Appendix 1 - General Ledger Closedown Timetable
Work Area Task
No. Task Description Lead Responsibility
2022-23
Undertaking Task
2022-23 Completion Date 2022-23
57 Deadline for return of accrued / prepaid expenditure
templates to Finance Support Team
Principal Accountants Departmental Support
Teams
14/04/2023
58 Finance Support team process accrued/prepaid expenditure Mary McCallum Astrid Ronald 17/04/23 - 21/04/23
59 Deadline for Upload of Accrual Templates to General
Ledger.
Mary McCallum Astrid Ronald 21/04/2023
PECOS Accruals 60
All PECOS invoices to be with Creditors for keying by 5pm. Departments Departments 24/03/2023
61 Final keying of PECOS invoices by Creditors. Malcolm Bannatyne Creditors Section 28/03/2023
62 All unpaid invoices (mismatches and receipts) required to be
cleared from PECOS system by 5pm.
Procurement will continue to issue weekly reports of all
unpaid invoices to Heads of Service for circulation to their
staff.  Each PECOS requisitioner is responsible for clearing
their own unpaid invoices.
Mary McCallum Departments / Emma
Graham
29/03/2023
63 Final PECOS interface with payables ledger for 2022-23.  (Run
matching process at 5.30pm on 29th)
Mary McCallum Creditors Section 29/03/2023
64 Final PECOS Pay-All of 2022-23 Malcolm Bannatyne Creditors Section 30/03/2023
65 All PECOS users to ensure all goods/services/works
received/completed within the old financial year are
receipted on the system by 5pm.
Departments Departments 30/03/2023
66 PECOS Accrual Report run. Mary McCallum Emma Graham 31/03/2023
67 PECOS Accrual Report issued to Finance Support Team to
manipulate to include department and return to PECOS team
to issue to Departments.
Mary McCallum Emma Graham /Duncan
MacBrayne
03/04/2023
68 Circulation of year end reports to each Department. Mary McCallum Emma Graham 04/04/2023
69 PECOS interfaces to Payables to continue processing into
New Year.
Mary McCallum Procurement/Creditors From 03/04/23
70 Departments to include unpaid receipted orders on main
PECOS accrual template.
Principal Accountants Departments /
Departmental Support
Teams
by 14/04/23
Holiday Pay Accrual -
Teachers
71 Collection of teacher data / calculation of accrual Mary McCallum Mary McCallum 28/03/23-11/04/23
72 Completion of holiday pay accrual template based on
previous years sample and methodology
Mary McCallum Mary McCallum 03/04/23 to 11/04/23
Page 92

Page 93

Appendix 1 - General Ledger Closedown Timetable
Work Area Task
No. Task Description Lead Responsibility
2022-23
Undertaking Task
2022-23 Completion Date 2022-23
73 Complete Flexi leave accrual calculations Mary McCallum Mary McCallum 03/04/23 to 11/04/23
74 Process journal and SMR reversing entry Mary McCallum Mary McCallum 12/04/2023
Payroll - Pay 07 MONTHLY
(Month 1)
75 Deadline for Travel/Expense Claims to Creditors - Pay 07
Month 1
Malcolm Bannatyne Departments 24/03/2023
76 Deadline for Timesheets to Payroll - Pay 07 Month 1 Lorraine Brodie Departments 05/04/2023
77 Processing Pay 07 Month 1 Lorraine Brodie Payroll Section 06/04/2023
78 Clearance of Pay 07 Month 1 suspense items Lorraine Brodie Payroll Section 14/04/2023
79 Accrual Pay 07 Month 1 Mary McCallum Ailsa Laing / Duncan
MacBrayne
14/04/23 to 19/04/23
Payroll - Pay 10 TEACHERS
(Month 1)
80 Deadline for Travel/Expense Claims to Creditors - Pay 10
Teachers Month 1
Malcolm Bannatyne Departments 14/04/2023
81 Deadline for Timesheets to payroll Pay 10 Teachers Month 1 Lorraine Brodie Departments 20/04/2023
82 Processing Pay 10 Teachers Month 1 Lorraine Brodie Payroll Section 21/04/2023
83 Clearance of Pay 10 Month 1 suspense items Lorraine Brodie Payroll Section 27/04/2023
84 Accrual Pay 10 Teachers Month 1 Mary McCallum Ailsa Laing / Duncan
MacBrayne
27/04/22 to 28/04/22
Payroll - Pay 10 TEACHERS
(Month 2)
85 Deadline for Travel/Expenses Claims - Pay 10 Teachers Month
2
Malcolm Bannatyne Departments 05/05/2023
86 Deadline for Timesheets to Payroll Pay 10 Teachers Month 2 Lorraine Brodie Departments 18/05/2023
87 Processing Pay 10 Teachers Month 2 Lorraine Brodie Payroll Section 19/05/2023
8. Cash and Income -
Accrued/Deferred Income -
Sundry Debtor Accounts
88 Deadline for sending debtor accounts to Debtors Section Fergus Walker Departments 22/03/2023
89 Input of old year debtor accounts (Central and Local) Fergus Walker Jennifer Gorman 23/03/23 to 29/03/23
90 Year end reports produced Fergus Walker Jennifer Gorman 05/04/2023
91 Sundry Debtor account reconciliations Fergus Walker Jennifer Gorman 05/04/2023 - 14/04/2023
92 Calculation of Sundry Debtors Bad Debt Provision Fergus Walker David Forshaw 12/04/23 to 14/04/23
93 Process journal adjusting ledger for change in Sundry Debtors
BDP
Fergus Walker David Forshaw 14/04/2023
94 Sundry Debtor accounts complete Fergus Walker David Forshaw 14/04/2023
Housing Benefit
Overpayments
95 Calculation of Housing Benefit Overpayment Debtor Fergus Walker Fergus Walker 05/05/2023
96 Calculate associated bad debt provision Fergus Walker Fergus Walker 05/05/2023
97 Process journals for housing benefit overpayments Fergus Walker Fergus Walker 05/05/2023
98 Housing Benefit Overpayments Complete Fergus Walker Fergus Walker 05/05/2023
Page 93

Page 94

Appendix 1 - General Ledger Closedown Timetable
Work Area Task
No. Task Description Lead Responsibility
2022-23
Undertaking Task
2022-23 Completion Date 2022-23
Banking 99 All monies/cheques should be banked Departments Departments 31/03/2023
100 Monies/cheques received after final banking relating to 2022-
23 to be added to accruals template
Principal Accountants Departments 01/04/23 to 05/04/23
E-Income Journals 101 Deadline for E- Income Journals to Cash Section. Kintyre
House, Campbeltown.
Margo Turner/Nancy Hope Departments 31/03/2023
102 Cash Section to process year-end E-income journals Margo Turner/Nancy Hope Cash Section 01/04/23 to 05/04/23
103 Bank reconciliation on expenditure account Malcolm Bannatyne Creditors Section 11/04/23 to 21/04/23
104 Bank reconciliation on Council Tax and NDR account Fergus Walker Alison McGeachy 05/04/23-21/04/23
105 Bank reconciliation on Income Account Fergus Walker Alison McGeachy 05/04/23-21/04/23
106 Bank reconciliation on Housing Benefit Account Fergus Walker Sharon Leitch 05/04/23-21/04/23
107 Bank reconciliation on Land Contamination Bank Account Moira Miller Sandra Coles 06/04/23 to 21/04/23
Imprests 108 Imprest certificates/returns issued to imprest holders Malcolm Bannatyne Graham Munro 27/02/2023
109 Establishments complete certificates/returns Departments Departments 31/03/23 to 14/04/23
110 Deadline for return of Certificates to Creditors Section Departments Departments 14/04/2023
111 Reconciliation of all Imprest balances (including schools) Malcolm Bannatyne Graham Munro 17/04/23 to 21/04/23
112 Process final imprest adjustments in ledger Malcolm Bannatyne Graham Munro 24/04/2023
113 Income Accrual / Deferred Income Templates issued to
departments
Mary McCallum Astrid Ronald 01/02/2023
Other Income Accruals /
Deferred Income
114 Departments complete other income accrual/ deferred
income templates
Principal Accountants Departments 21/03/2023 - 14/04/2023
115 Deadline for return of accrued / deferred income templates
to Finance Support Team.
Principal Accountants Departmental Support
Teams
14/04/2023
116 Finance Support team process income accruals / deferred
income
Mary McCallum Astrid Ronald 17/04/23 - 21/04/23
9. Internal Recharges 117 Final date for producing 2022-23 Internal recharges Departments Departments 24/03/2023
118 Deadline for coded recharges to be sent to Finance Support
Team
Departments Departments 29/03/2023
119 Internal Recharges uploaded into the ledger Mary McCallum Margaret Ellis 31/03/2023
120 Outstanding Accounts cleared from Internal Recharge system Mary McCallum Margaret Ellis 31/03/2023
Page 94

Page 95

Appendix 1 - General Ledger Closedown Timetable
Work Area Task
No. Task Description Lead Responsibility
2022-23
Undertaking Task
2022-23 Completion Date 2022-23
121 Submit Manual journal entries for any Internal Recharges that
need to be processed for 22-23 FY. 
Upload by Finance Support Team
Mary McCallum Elaine Maxwell 05/04/2023
122 Uploaded by finance Support Team Mary McCallum Astrid Ronald 06/04/2023
121 Departments to clear 29901 accounts Departments Departments 04/04/23-06/04/23
10. Stores and Work in
Progress - Stores
122 Accounting and Budgeting Teams issue instructions to Stores Morag Cupples / David
Forshaw
Departments 27/02/2023
123 Departments prepare for stock count Morag Cupples / David
Forshaw
Departments 01/03/23 to 30/03/23
124 Stock count Morag Cupples / David
Forshaw
Departments 31/03/2023
125 Stock certificates to be completed and sent to Principal
Accountants, Development and Infrastructure Services and
Social Work
David Forshaw/Lorna
Jordan/Linda Taylor
Elizabeth Moller 01/04/23 to 06/04/23
126 Principal Accountants to review certificates and process final
journal
David Forshaw/Lorna
Jordan/Linda Taylor
Elizabeth Moller 11/04/23 to 14/04/23
Work in Progress 127 Department prepares a valued list of Works in Progress Linda Taylor Departments 01/04/23 to 03/05/23
128 Pass to Principal Accountant for Review and Journal
Processing
Linda Taylor Bruce MacPherson 03/05/23 to 04/05/23
129 Consolidation Adjustments (if any) Linda Taylor Bruce MacPherson 08/05/2023
130 Finalise Lead Schedule and Working Papers Linda Taylor Linda Taylor 08/05/2023
11. Control and Suspense
Accounts - Control Accounts
131 Report issued to Control Account Holder Mary McCallum Ailsa Laing  03/04/2023
132 Clear balance or complete Carry Forward of Control Account
Balance form
Mary McCallum Control Account Budget
Holders
03/04/23 - 28/04/23
133 Transfer of control account balances to Balance Sheet Mary McCallum Ailsa Laing  02/05/23 - 05/05/23
134 Report issued to Suspense Account Holder Mary McCallum Ailsa Laing  03/04/2023
135 Balance should be cleared (excluding payroll suspense which
should be cleared by 06 April for Pay07 entries and 25 April
for Pay10)
Mary McCallum Departments 05/04/23 to 21/04/23
12. Journals and Feeders 136 Opening of April and Adjust Periods Mary McCallum Astrid Ronald 03/04/2023
137 Departments prepare and input journals Principal Accountants Departments 03/04/23 - 28/04/23
Page 95

Page 96

Appendix 1 - General Ledger Closedown Timetable
Work Area Task
No. Task Description Lead Responsibility
2022-23
Undertaking Task
2022-23 Completion Date 2022-23
138 Dept's cut off date for journals Mary McCallum Departments 28/04/2023
139 Processing of Central Finance journals Mary McCallum Astrid Ronald 28/04/2023
140 Final feeders from roads costing to general ledger Linda Taylor Joyce Cowan 03/04/23 to 03/05/23
141 Preparation and input of any final journals identified Principal Accountants Departmental Support
Teams
03/04/23 - 28/04/23
142 Central support / departmental admin recharging Mary McCallum Mary McCallum 15/05/23-19/05/23
143 Input of Live Argyll Journals and agreement of final Balance
Sheet Position
Sharon Macalister Beth Walkosz 03/04/23 - 28/04/23
144 Input of Council Tax & NDR Journals / Clearance of Raw Cash
Accounts
Fergus Walker Fergus Walker 03/04/23 - 12/05/23
Page 96

Page 97

Appendix 1 - Final Accounts Preparation Plan and Timetable
Work Area Task
No. Task Description Lead Responsibility
2021-22
Undertaking Task
2021-22
Completion Date
2022-23
1. (a) Year end monitoring 1 Completion and return of earmarking requests Principal Accountants Finance Contacts 17/04/23 to 5/05/23
1. (a) Year end monitoring 2 Preparation of year-end monitoring reports Mary McCallum Mary McCallum / Abi Harley 22/05/23-24/05/23
1. (a) Year end monitoring 3 Perform year-end monitoring with departmental
explanations
Principal Accountants Finance Contacts 25/05/23-26/05/23
1. (a) Year end monitoring 4 Deadline for return of completed revenue
monitoring
Principal Accountants Principal Accountants 26/05/2023
1. (a) Year end monitoring /
20. Revenue Budget
Monitoring Report
5 Preparation of Year-end Revenue Budget
Monitoring Corporate Overview and Committee
Report
Mary McCallum Mary McCallum / Abi Harley 29/05/2023
1. (a) Year end monitoring /
19. Earmarked Reserves
Report
6 Preparation of Year-end Reserves Report Mary McCallum Mary McCallum / Abi Harley 26/05/2023
1. (a) Year end monitoring 7 Deadline for Reports to SMT Mary McCallum Mary McCallum / Abi Harley 30/05/2023
1 (b) Analytical Review 8 Preparation of analytical review Mary McCallum Mary McCallum / Abi Harley 02/06/2023
1 (b) Analytical Review 9 Update analytical review with departmental
explanations
Principal Accountants Finance Contacts 05/06/23-22/06/23
1 (b) Analytical Review 10 Deadline for completion of analytical review Principal Accountants Principal Accountants 23/06/2023
1 (b) Analytical Review 11 Submit analytical review to Auditors Mary McCallum Mary McCallum / Abi Harley 30/06/2023
1 (c) LFR 12 Run downloads for LFR returns David Forshaw Moira Miller 26/05/2023
1 (c) LFR 13 Complete Support Services Working Paper David Forshaw Moira Miller 26/05/2023
1 (c) LFR 14 Create LFR Return Working Paper Source File David Forshaw Moira Miller TBC
1 (c) LFR 15 Prepare Individual Returns David Forshaw Moira Miller/ Linda Taylor /
Fergus Walker / Gill Allenby /
Lorna Jordan
TBC
1 (c) LFR 16 Check & submit David Forshaw Moira Miller TBC
2. Comprehensive Income
and Expenditure Statement
17 Run Retained Earnings Proof Morag Cupples Morag Cupples 22/05/2023
2. Comprehensive Income and
Expenditure Statement
18 Run Comprehensive Income & Expenditure
download (cost centres, cost centres and account
codes)
Morag Cupples Morag Cupples 22/05/2023
2. Comprehensive Income and
Expenditure Statement
19 Final Outturn  CI&E based on management
structure
Morag Cupples Morag Cupples 22/05/2023
Page 97

Page 98

Appendix 1 - Final Accounts Preparation Plan and Timetable
Work Area Task
No. Task Description Lead Responsibility
2021-22
Undertaking Task
2021-22
Completion Date
2022-23
2. Comprehensive Income and
Expenditure Statement
20 Complete Comprehensive Income & Expenditure
Statement
Morag Cupples Morag Cupples 22/05/2023
2. Comprehensive Income and
Expenditure Statement
21 Comprehensive Income & Expenditure Statement
completed
Morag Cupples Morag Cupples 22/05/2023
3. Expenditure and Funding
Analysis
22 Calculate adjustments between funding and
accounting basis on management structure
Morag Cupples Morag Cupples 24/05/2023
3. Expenditure and Funding
Analysis
23 Complete Note 31 - Note to the Expenditure and
Funding Analysis
Morag Cupples Morag Cupples 24/05/2023
3. Expenditure and Funding
Analysis
24 Complete main Expenditure and Funding
Analysis Statement
Morag Cupples Morag Cupples 24/05/2023
4. Comprehensive Income
and Expenditure Statement
Notes
25 Complete General Fund Earmarking Note (Note 5) Mary McCallum Mary McCallum / Abi Harley 22/05/2023
4. Comprehensive Income and
Expenditure Statement Notes
26 Complete Segmental Reporting Note for Accounts
(Note 6) - Analysis of Expenditure and Income by
Nature (Note 6.1) and Revenue from contracts
with service recipients (Note 6.2)
Morag Cupples Morag Cupples 26/05/2023
4. Comprehensive Income and
Expenditure Statement Notes
27 Complete Other Operating Income and
Expenditure Note (Note 7)
Morag Cupples Morag Cupples 26/05/2023
4. Comprehensive Income and
Expenditure Statement Notes
28 Complete Agency Income Note (Note 8) Moira Miller Morag Cupples 26/05/2023
4. Comprehensive Income and
Expenditure Statement Notes
29 Community Care and Health (Scotland) Act 2002
(Note 9)
David Forshaw Elizabeth Moller 15/05/23 to 19/05/23
Page 98

Page 99

Appendix 1 - Final Accounts Preparation Plan and Timetable
Work Area Task
No. Task Description Lead Responsibility
2021-22
Undertaking Task
2021-22
Completion Date
2022-23
4. Comprehensive Income and
Expenditure Statement Notes
30 Complete Waste Management PPP note (Note 11) Linda Taylor Brenda Mitchell 17/05/23 to 19/05/23
4. Comprehensive Income and
Expenditure Statement Notes
31 Complete Fees Payable to External Auditors note
(Note 10)
Mary McCallum Ailsa Laing 28/04/2023
4. Comprehensive Income and
Expenditure Statement Notes
32 Complete Grant Income note (Note 12) Mary McCallum Bruce MacPherson/Mary
McCallum
17/05/23 to 19/05/23
Related Parties (Note 13) 33 Arrange for related party letters to be sent to
members and senior officers
Sandra Coles Fiona Ferguson 27/02/2023
Related Parties (Note 13) 34 Scottish Government (Note 13.1) - check
narrative.
Moira Miller Moira Miller 15/05/2023
Related Parties (Note 13) 35 Complete Members related party transactions
exceeding £10k table (Note 13.2)
Moira Miller Moira Miller 15/05/23 to 19/05/23
Related Parties (Note 13) 36 Complete other related bodies note, identifying
those that exceed £10k (Note 13.3)
Moira Miller Moira Miller 15/05/23 to 19/05/23
Related Parties (Note 13) 37 Comprehensive Income & Expenditure Statement
Notes completed
Morag Cupples Morag Cupples 26/05/2023
5. Balance Sheet - PPE (Note
14)
38 Complete Movement in Property Plant and
Equipment note (Note 14.1)
Morag Cupples Linda Taylor 17/05/23 to 19/05/23
5. Balance Sheet - PPE (Note
14)
39 Complete Valuation of Property, Plant and
Equipment note (Note 14.2)
Morag Cupples Linda Taylor 17/05/23 to 19/05/23
5. Balance Sheet - PPE (Note
14)
40 Depreciation (Note 14.3) Morag Cupples Linda Taylor 17/05/23 to 19/05/23
5. Balance Sheet - PPE (Note
14)
41 Summary of Capital Expenditure and Financing
(Note 14.4)
Morag Cupples Linda Taylor 17/05/23 to 19/05/23
Page 99

Page 100

Appendix 1 - Final Accounts Preparation Plan and Timetable
Work Area Task
No. Task Description Lead Responsibility
2021-22
Undertaking Task
2021-22
Completion Date
2022-23
5. Balance Sheet - PPE (Note
14)
42 Commitments under Capital Contracts (14.5) Morag Cupples Linda Taylor 22/05/23 to 26/05/23
Heritage Assets (Note 15) 43 Provide Reconciliation of Carrying Values Morag Cupples Linda Taylor 26/05/2023
Heritage Assets (Note 15) 44 Complete Heritage Asset Disclosures (Note 15) Morag Cupples Linda Taylor 26/05/2023
Intangible Fixed Assets Note
(Note 16)
45 Complete Movement in Intangible Fixed Assets
note (Note 16)
Morag Cupples Linda Taylor 26/05/2023
Investment Property (Note
17)
46 Investment Property (Note 17) - check narrative. Morag Cupples Linda Taylor 26/05/2023
Investment Property (Note
17)
47 Complete Movement in Investment Property note
(Note 17.1)
Morag Cupples Linda Taylor 26/05/2023
Investment Property (Note
17)
48 Calculate Investment Property Income and
Expenditure and complete note (Note 17.2),
ensure reconciles to analysis of investment
income on face of CI&E
Morag Cupples Linda Taylor 26/05/2023
Schools Non Profit
Distributing Organisation
(Note 18)
49 Complete Assets Held under Schools NPDO /Hub
Schools contract note (Note 18 / 18.1)
Morag Cupples Linda Taylor 17/05/2023
Schools Non Profit
Distributing Organisation
(Note 18)
50 Complete Schools NPDO /Hub Schools Finance
Lease Liability note (Note 18.2)
Moira Miller Moira Miller 28/04/2023
Schools Non Profit
Distributing Organisation
(Note 18)
51 Complete Payments due to Operator Under
Schools NPDO Contract note (Note 18.3)
Moira Miller Moira Miller 28/04/2023
Schools Non Profit
Distributing Organisation
(Note 18)
52 Complete Payments due to Operator under Hub
Schools  (Note 18.4)
Moira Miller Moira Miller 28/04/2023
Operating Leases (Note 19) 53 Request information from departments re
operating leases
Morag Cupples Moira Miller 13/03/2023
Operating Leases (Note 19) 54 Departments complete operating lease template Morag Cupples Moira Miller 13/03/23 to 21/04/23
Page 100

Page 101

Appendix 1 - Final Accounts Preparation Plan and Timetable
Work Area Task
No. Task Description Lead Responsibility
2021-22
Undertaking Task
2021-22
Completion Date
2022-23
Operating Leases (Note 19) 55 Complete Operating Leases - Amounts Paid to
Lessors note (Note 19.1)
Morag Cupples Moira Miller 13/03/23 to 21/04/23
Operating Leases (Note 19) 56 Complete Assets Held Under Operating Leases
note (Note 19.2)
Morag Cupples Moira Miller 13/03/23 to 21/04/23
Finance Leases (Note 20) 57 Request information from departments re finance
leases
Moira Miller Sandra Coles 13/03/2023
Finance Leases (Note 20) 58 Complete Finance Leases - Amounts Paid to
Lessors note (Note 20.1)
Moira Miller Sandra Coles 24/04/2023
Finance Leases (Note 20) 59 Complete Assets Held Under Finance Leases note
(Note 20.2)
Moira Miller Sandra Coles 25/04/2023
Finance Leases (Note 20) 60 Complete Finance Lease Liability note (Note 20.3) Moira Miller Sandra Coles 25/04/2023
Long Term
Debtors/Investments (Note
21)
61 House Loans (Working Papers Completed) Mary McCallum Duncan MacBrayne 12/04/2023
Long Term
Debtors/Investments (Note
21)
62 Waste PPP Land Contamination Fund Moira Miller Sandra Coles 17/04/2023
Long Term
Debtors/Investments (Note
21)
63 Calculation of Charging Orders - Care Home Fees
LT Debtor and completion of associated working
papers
David Forshaw Lorna Semple 14/04/2023
Long Term
Debtors/Investments (Note
21)
64 SHF - Loans to Registered Social Landlords Moira Miller Moira Miller 14/04/2023
Page 101

Page 102

Appendix 1 - Final Accounts Preparation Plan and Timetable
Work Area Task
No. Task Description Lead Responsibility
2021-22
Undertaking Task
2021-22
Completion Date
2022-23
Long Term
Debtors/Investments (Note
21)
65 ALIEA - Alienergy long term debt Morag Cupples Morag Cupples 14/04/2023
Long Term
Debtors/Investments (Note
21)
66 Calculation and working papers for Other Long
Term Debtors (if any)
Moira Miller Moira Miller 19/05/2023
Long Term
Debtors/Investments (Note
21)
67 Finalise Lead Schedule and Working Papers Moira Miller Moira Miller 19/05/2023
Long Term
Debtors/Investments (Note
21)
68 Completion of LT Debtor Note (21) Moira Miller Moira Miller 19/05/2023
Short Term Debtors (Note 22) 69 Local Tax Collection Debtors - Production of
working papers
Fergus Walker Fergus Walker 08/05/23-12/05/23
Short Term Debtors (Note 22) 70 Sundry Debtor Accounts - Production of Working
Papers
Fergus Walker Jennifer Gorman 19/04/23 to 21/04/23
Short Term Debtors (Note 22) 71 Housing Benefit Overpayments - Production of
Working Papers
Fergus Walker Fergus Walker 11/04/23 to 17/04/23
Short Term Debtors (Note 22) 72 Check the Discretionary Housing Payment Subsidy
from the Scottish Government
Fergus Walker Fergus Walker 17/05/2023
Short Term Debtors (Note 22) 73 VAT Debtor - Production of Working Papers Moira Miller Sandra Coles 28/04/2023
Short Term Debtors (Note 22) 74 Net Debtor/Creditor to Scottish Government for
NDR - Finalise Working Papers
Fergus Walker Mary McCallum 15/05/2023
Short Term Debtors (Note 22) 75 Other Debtors - Provision of working papers from
various departments
Moira Miller Departments 15/05/23 to 19/05/23
Short Term Debtors (Note 22) 76 Finalise Lead Schedule and Working Papers Moira Miller Elizabeth Moller 22/05/2023
Page 102

Page 103

Appendix 1 - Final Accounts Preparation Plan and Timetable
Work Area Task
No. Task Description Lead Responsibility
2021-22
Undertaking Task
2021-22
Completion Date
2022-23
Short Term Debtors (Note 22) 77 Debtors Note (22) Moira Miller Elizabeth Moller 22/05/2023
Assets Held for Sale (Note 23) 78 Complete Assets Held for Sale Note (23) Morag Cupples Linda Taylor 26/05/2023
Assets Held for Sale (Note 23) 79 Finalise Lead Schedule and Working Papers Morag Cupples Linda Taylor 26/05/2023
Cash and Cash Equivalents
(Note 24)
80 Cash Held by the Authority (Imprests) - provide
working papers
Sandra Coles Graham Munro 24/04/23 to 28/04/23
Cash and Cash Equivalents
(Note 24)
81 Cash in Transit - Working Papers Moira Miller Alison McGeachy 10/05/23 to 12/05/23
CC&E - Short Term Deposits 82 Council Investments - reconciliation and working
papers
Moira Miller Sandra Coles 26/04/2023
CC&E - Short Term Deposits 83 BoS Corporate Deposit - working papers Moira Miller Sandra Coles 19/04/2023
CC&E - Short Term Deposits 84 CB Instant Access Account - working papers Moira Miller Sandra Coles 19/04/2023
CC&E - Short Term Deposits 85 Money Market Funds Moira Miller Sandra Coles 19/04/2023
CC&E - Bank Overdraft
Working Papers
86 Income Bank Account - working papers Moira Miller Alison McGeachy 28/04/2023
CC&E - Bank Overdraft
Working Papers
87 Expenditure Bank Account - working papers Moira Miller Creditors 28/04/2023
CC&E - Bank Overdraft
Working Papers
88 Housing Benefits Bank Account - working papers Moira Miller Sharon Leitch 28/04/2023
CC&E - Bank Overdraft
Working Papers
89 Council Tax / NDR Bank Account - working papers Moira Miller Alison McGeachy 28/04/2023
Page 103

Page 104

Appendix 1 - Final Accounts Preparation Plan and Timetable
Work Area Task
No. Task Description Lead Responsibility
2021-22
Undertaking Task
2021-22
Completion Date
2022-23
CC&E - Bank Overdraft
Working Papers
90 Finalise Lead Schedule and Working Papers Moira Miller Sandra Coles 12/05/2023
CC&E - Bank Overdraft
Working Papers
91 Complete Cash and Cash Equivalents Note (24) Moira Miller Sandra Coles 12/05/2023
Creditors (Note 25) 92 Accrued Payrolls - Pull overall figure together for
Accrued Payrolls
Mary McCallum Ailsa Laing / Duncan
MacBrayne
28/04/2023
Superannuation 93 Teachers - Identification of year end balance on
teachers superannuation control account as at 31
March 2021
Mary McCallum Ailsa Laing 04/05/2023
Superannuation 94 Non-teachers - Identification of year end balance
on non-teachers superannuation control account
as at 31 March 2021
Mary McCallum Ailsa Laing 05/05/2023
Short Term Accumulating
Absences
95 Teachers - Provision of working papers for
creditors
Mary McCallum Mary McCallum 13/04/2023
Short Term Accumulating
Absences
96 Non Teachers - Provision of working papers for
creditors
Mary McCallum Mary McCallum 13/04/2023
Creditors Core Payables 97 Creditors System Liability (Core Payables) -
Working papers/discoverer report
Mary McCallum Duncan MacBrayne 31/03/2023
Accruals/Deferred Income 98 Accrued Expenditure/deferred income - Pull
summary sheet together with links to templates
to help auditors choose sample
Mary McCallum Margaret Ellis 28/04/2023
Other Creditors 99 Other Creditors - various Departmental Support
(coordination of working papers)
Mary McCallum Mary McCallum 03/05/23 to 05/05/23
Other Creditors 100 Finalise Lead Schedule and working Papers Mary McCallum Mary McCallum 08/05/2023
Page 104

Page 105

Appendix 1 - Final Accounts Preparation Plan and Timetable
Work Area Task
No. Task Description Lead Responsibility
2021-22
Undertaking Task
2021-22
Completion Date
2022-23
Other Creditors 101 Complete Creditors Note (25) Mary McCallum Mary McCallum 08/05/2023
Borrowings (Financial
Instruments) - Note 26
102 Completion of Borrowings/Financial Instruments
Working Papers
Moira Miller Moira Miller 26/05/2023
Borrowings (Financial
Instruments) - Note 26
103 Financial Instruments - Types - Note 26.1 Moira Miller Moira Miller 26/05/2023
Borrowings (Financial
Instruments) - Note 26
104 Financial Instruments - Fair Value - Note 26.2 Moira Miller Moira Miller 26/05/2023
Borrowings (Financial
Instruments) - Note 26
105 Financial Instruments - Gains and Losses - Note
26.3
Moira Miller Moira Miller 26/05/2023
Borrowings (Financial
Instruments) - Note 26
106 Financial Instruments - Risks - Note 26.4 to 26.9 Moira Miller Moira Miller 26/05/2023
Borrowings (Financial
Instruments) - Note 26
107 Financial Instruments - Note 26.10 to 26.11 Moira Miller Moira Miller 26/05/2023
Borrowings (Financial
Instruments) - Note 26
108 Borrowings/Financial Instruments - Complete
Accounts
Moira Miller Moira Miller 26/05/2023
Other Liabilities (Note 27) 109 Finance Lease Liability Sandra/Anne Blue Moira Miller 26/05/2023
Other Liabilities (Note 27) 110 Schools NPDO/Hub Schools Finance Lease Liability Margaret Moncur Moira Miller 28/04/2023
Other Liabilities (Note 27) 111 Waste PPP Land Contamination - Provision of
working paper, same as long term debtor.
Moira Miller Sandra Coles 17/04/2023
Page 105

Page 106

Appendix 1 - Final Accounts Preparation Plan and Timetable
Work Area Task
No. Task Description Lead Responsibility
2021-22
Undertaking Task
2021-22
Completion Date
2022-23
Other Liabilities (Note 27) 112 Finalise Lead Schedule and Working Papers Moira Miller Sandra Coles 28/04/2023
Other Liabilities (Note 27) 113 Complete Other Liabilities Note (27) Moira Miller Sandra Coles 28/04/2023
Other Liabilities (Note 27) 114 Equal Pay Claims - Contact HR for information Lorna Semple/Elizabeth Moller Lorna Semple/Elizabeth Moller 01/03/2023
Other Liabilities (Note 27) 115 Equal Pay Claims - Calculate provision and provide
working papers. Ensure we contact HR early for
information
Lorna Semple/Elizabeth Moller Lorna Semple/Elizabeth Moller 03/05/23 to 05/05/23
Other Liabilities (Note 27) 116 Registered Social Landlords - Calculate provision
and provide working papers
Fergus Walker Fergus Walker 03/05/23 to 05/05/23
Other Liabilities (Note 27) 117 Reorganisation Redundancy Costs - Calculate
provision and provide working papers
Mary McCallum Mary McCallum 03/05/23 to 05/05/23
Other Liabilities (Note 27) 118 Landfill Sites - Restoration and Aftercare Costs -
Calculate provision and provide working papers
Moira Miller Moira Miller 03/05/23 to 05/05/23
Other Liabilities (Note 27) 119 Utilities Provision - Calculate provision and
provide working papers
Sharon Macalister Liza McNaughton 03/05/23 to 05/05/23
Other Liabilities (Note 27) 120 Other Provisions - Coordinate calculation of
'other' provisions and obtain working papers
Morag Cupples Morag Cupples 03/05/23 to 05/05/23
Other Liabilities (Note 27) 121 Split Provisions between short and long term Morag Cupples Morag Cupples 22/05/2023
Other Liabilities (Note 27) 122 Provisions Note (28) - check narrative Morag Cupples Morag Cupples 22/05/2023
Other Liabilities (Note 27) 123 Finalise Lead Schedule and Working Papers Morag Cupples Morag Cupples 22/05/2023
Capital Grants Received in
Advance (Note 29)
124 Ministry of Defence LIBOR Funding Morag Cupples Morag Cupples
Page 106

Page 107

Appendix 1 - Final Accounts Preparation Plan and Timetable
Work Area Task
No. Task Description Lead Responsibility
2021-22
Undertaking Task
2021-22
Completion Date
2022-23
Capital Grants Received in
Advance (Note 29)
125 Grant in Aid - Gaelic School Capital Fund Morag Cupples Morag Cupples
Capital Grants Received in
Advance (Note 29)
126 Finalise Lead Schedule and Working Papers Morag Cupples Morag Cupples 22/05/2023
Capital Grants Received in
Advance (Note 29)
127 Complete Capital Grants Received in Advance
Note (29)
Morag Cupples Morag Cupples 22/05/2023
Pension Assets and Liabilities
(Note 30)
128 Calculation of Accrued Pension Contribution (30.1) Lorna Semple/Elizabeth Moller Lorna Semple/Elizabeth Moller 03/05/2023
Pension Assets and Liabilities
(Note 30)
129 Transactions Relating to Retirement Benefits
(30.2)
Lorna Semple/Elizabeth Moller Lorna Semple/Elizabeth Moller 03/05/2023
Pension Assets and Liabilities
(Note 30)
130 Assets and Liabilities in Relation to Post
Employment Benefits (30.3)
Lorna Semple/Elizabeth Moller Lorna Semple/Elizabeth Moller 03/05/2023
Pension Assets and Liabilities
(Note 30)
131 Pension Assets and Liabilities Recognised in the
Balance Sheet (30.4)
Lorna Semple/Elizabeth Moller Lorna Semple/Elizabeth Moller 03/05/2023
Pension Assets and Liabilities
(Note 30)
132 Analysis of Pension Fund Assets (30.5) Lorna Semple/Elizabeth Moller Lorna Semple/Elizabeth Moller 03/05/2023
Pension Assets and Liabilities
(Note 30)
133 Basis for Estimating Assets and Liabilities (30.6) Lorna Semple/Elizabeth Moller Lorna Semple/Elizabeth Moller 03/05/2023
Pension Assets and Liabilities
(Note 30)
134 Asset and Liability Matching Strategy (30.7) Lorna Semple/Elizabeth Moller Lorna Semple/Elizabeth Moller 03/05/2023
Pension Assets and Liabilities
(Note 30)
135 Impact on Authority's Cash Flow (30.8) Lorna Semple/Elizabeth Moller Lorna Semple/Elizabeth Moller 03/05/2023
Pension Assets and Liabilities
(Note 30)
136 Teachers' Pensions - Amount Paid Over (30.9) Lorna Semple/Elizabeth Moller Lorna Semple/Elizabeth Moller 03/05/2023
Pension Assets and Liabilities
(Note 30)
137 Teachers' Pensions - Check Contribution Rate
(30.9)
Lorna Semple/Elizabeth Moller Lorna Semple/Elizabeth Moller 03/05/2023
Pension Assets and Liabilities
(Note 30)
138 Teachers' Pensions - Added Years awarded by
Council Calculation (30.9)
Lorna Semple/Elizabeth Moller Lorna Semple/Elizabeth Moller 03/05/2023
Page 107

Page 108

Appendix 1 - Final Accounts Preparation Plan and Timetable
Work Area Task
No. Task Description Lead Responsibility
2021-22
Undertaking Task
2021-22
Completion Date
2022-23
Pension Assets and Liabilities
(Note 30)
139 Balance Sheet Notes Complete Morag Cupples Morag Cupples 26/05/2023
6. Other Notes to the
Financial Statements
140 Note 1 - Review and amend accounting policies Morag Cupples Morag Cupples 24/02/2023
6. Other Notes to the
Financial Statements
141 Note 2 - Accounting Standards Issued but Not Yet
Adopted
Morag Cupples Morag Cupples 24/02/2023
6. Other Notes to the
Financial Statements
142 Note 3 - Critical Judgements in Applying
Accounting Policies
Morag Cupples Morag Cupples 05/05/2023
6. Other Notes to the
Financial Statements
143 Note 4 - Assumptions / Estimation Uncertainty Morag Cupples Morag Cupples 15/05/2023
6. Other Notes to the
Financial Statements
144 Note 34 - Contingent Liabilities (consider
alongside provisions)
Morag Cupples Morag Cupples 05/05/2023
6. Other Notes to the
Financial Statements
145 Note 35 - Termination Benefits (consider
alongside Exit Packages)
Mary McCallum Mary McCallum 05/05/2023
6. Other Notes to the
Financial Statements
146 Note 36 - Trust Funds and Other Third Party Funds
(Part of preparing accounts for charities and other
trusts)
Mary McCallum Morag Cupples 05/05/2023
6. Other Notes to the
Financial Statements
147 Note 37 - Common Good Funds (Prepare Accounts
for Common Good Funds and collate information
for Oban and Campbeltown Funds)
Mary McCallum Morag Cupples 05/05/2023
6. Other Notes to the
Financial Statements
148 Note 38 - Tax Incremental Financing (TIF) Projects -
Links to NDR Income Account
Moira Miller/Fergus Walker Moira Miller 19/05/2023
7. Statement of Movement
in Reserves - General Fund
Balance
149 Analysis of General Fund Balance Movement Moira Miller Moira Miller 19/05/2023
7. Statement of Movement in
Reserves - General Fund
Balance
150 Analysis of amounts included in CI&E but excluded
from General Fund
Moira Miller Moira Miller 19/05/2023
7. Statement of Movement in
Reserves - General Fund
Balance
151 Analysis of amounts included in General Fund but
excluded from CI&E
Moira Miller Moira Miller 19/05/2023
Page 108

Page 109

Appendix 1 - Final Accounts Preparation Plan and Timetable
Work Area Task
No. Task Description Lead Responsibility
2021-22
Undertaking Task
2021-22
Completion Date
2022-23
7. Statement of Movement in
Reserves - General Fund
Balance
152 Transfer to from General Fund Balance Moira Miller Moira Miller 19/05/2023
7. Statement of Movement in
Reserves - General Fund
Balance
153 Breakdown of amounts additional to
surplus/deficit on CI&E
Moira Miller Moira Miller 19/05/2023
Other Usable Reserves (Note
33)
154 Usable Capital Receipts Reserve Moira Miller Sandra Coles 05/05/2023
Other Usable Reserves (Note
33)
155 Capital Fund Moira Miller Sandra Coles 05/05/2023
Other Usable Reserves (Note
33)
156 Complete Capital Funds Note  (33.1) Moira Miller Sandra Coles 05/05/2023
Other Usable Reserves (Note
33)
157 Completion of Education  R&R Fund Entries and
Working Papers
Sharon Macalister Gill Allenby/Sandra McLindon 28/04/2023
Other Usable Reserves (Note
33)
158 Process Ledger entries through MiR Statement Sharon Macalister Gill Allenby/Sandra McLindon 28/04/2023
Other Usable Reserves (Note
33)
159 Complete Repairs and Renewals Note (33.2) Sharon Macalister Gill Allenby/Sandra McLindon 28/04/2023
Unusable Reserves (Note 32) 160 Revaluation Reserve - Check Narrative Moira Miller Moira Miller 05/05/2023
Unusable Reserves (Note 32) 161 Capital Adjustment Account - Check Narrative Moira Miller Moira Miller 05/05/2023
Unusable Reserves (Note 32) 162 Financial Instruments Adjustment Account - Check
Narrative
Moira Miller Moira Miller 05/05/2023
Unusable Reserves (Note 32) 163 Pensions Reserve - Check Narrative Morag Cupples Morag Cupples 12/05/2023
Page 109

Page 110

Appendix 1 - Final Accounts Preparation Plan and Timetable
Work Area Task
No. Task Description Lead Responsibility
2021-22
Undertaking Task
2021-22
Completion Date
2022-23
Unusable Reserves (Note 32) 164 Accumulated Absences Account - Check Narrative Morag Cupples Morag Cupples 12/05/2023
Unusable Reserves (Note 32) 165 Statement of Movement in Reserves Complete Moira Miller Moira Miller 12/05/2023
8. Cash Flow Statement -
Analysis of Balance Sheet
Movements
166 Revaluation Reserve Moira Miller Moira Miller 29/05/23 to 02/06/23
8. Cash Flow Statement -
Analysis of Balance Sheet
Movements
167 Capital Adjustment Account Moira Miller Moira Miller 29/05/23 to 02/06/23
8. Cash Flow Statement -
Analysis of Balance Sheet
Movements
168 Capital Activities Cash/Non Cash Transactions Moira Miller Moira Miller 29/05/23 to 02/06/23
8. Cash Flow Statement -
Analysis of Balance Sheet
Movements
169 Other Revenue Items not involving the movement
of funds
Moira Miller Moira Miller 29/05/23 to 02/06/23
8. Cash Flow Statement -
Analysis of Balance Sheet
Movements
170 Accrual Adjustments Moira Miller Moira Miller 29/05/23 to 02/06/23
8. Cash Flow Statement -
Analysis of Balance Sheet
Movements
171 Complete Operating Activities  (Note 39) Moira Miller Moira Miller 29/05/23 to 02/06/23
8. Cash Flow Statement -
Analysis of Balance Sheet
Movements
172 Complete Operating Activities Section of
Statement
Moira Miller Moira Miller 29/05/23 to 02/06/23
Other Cash Flow Activities 173 Investing Activities (Note 40) Moira Miller Moira Miller 29/05/23 to 02/06/23
Other Cash Flow Activities 174 Financing Activities (Note 41) Moira Miller Moira Miller 29/05/23 to 02/06/23
Other Cash Flow Activities 175 Cash Flow Statement Complete Moira Miller Moira Miller 02/06/2023
9. Council Tax Income
Account
176 Prepare CTI Main Accounting Statement Fergus Walker Fergus Walker 08/05/23-12/05/23
9. Council Tax Income
Account
177 Prepare and complete Calculation of Council Tax
Base note
Fergus Walker Fergus Walker 12/05/2023
Page 110

Page 111

Appendix 1 - Final Accounts Preparation Plan and Timetable
Work Area Task
No. Task Description Lead Responsibility
2021-22
Undertaking Task
2021-22
Completion Date
2022-23
9. Council Tax Income
Account
178 Council Tax Income Account Complete Fergus Walker Fergus Walker 12/05/2023
10. NDR Income Account 179 NDRI Main Accounting Statement Fergus Walker Fergus Walker 12/05/2023
10. NDR Income Account 180 Analysis of Rateable Values Fergus Walker Fergus Walker 12/05/2023
10. NDR Income Account 181 NDR Charge Fergus Walker Fergus Walker 12/05/2023
10. NDR Income Account 182 NDR Income Account Complete Fergus Walker Fergus Walker 12/05/2023
Page 111

Page 112

PAYRUN MTH NO
PROCESSING
DATE PAY DATE
PERIOD
ENDING
PAYROLL COSTS %
ACCRUED/PREPAID
OVERTIME
COSTS %
ACCRUED
TIMESHEETS
TO PAYROLL
BY:
**TRAVEL
CLAIMS TO
CREDITORS
BY:
TRAVEL &
SUBSISTENCE %
ACCRUED
Additional
Notes
Pay 07 Monthly 01 06/04/2023 14/04/2023 15/04/2023 16/31sts accrued
100%
accrued 05/04/2023 24/03/2023 100% accrued
Old Year
Claims Only
Pay 10 Teachers 01 21/04/2023 29/04/2023 30/04/2023
100% part time
hours for this period -
See note * N/A 20/04/2023 14/04/2023 100% accrued
Old Year
Claims Only
Pay 10 Teachers 02 19/05/2023 29/05/2023 31/05/2023 See note * N/A 18/05/2023 05/05/2023 N/A N/A
Notes
** This relates to manual travel claims, not those through "my view" for which separate deadlines have been set by payroll.
YEAR END 2022/2023
Appendix 2 - Schedule for Payroll, Overtime and Travel accruals
* Pay 10 Teachers Month 01: Part time Teachers hours and enhancements relating to March will be 100% accrued.
* Pay 10 - Month 02 accrual will be done by the Financial Services Accounting and Budgeting - Education Departmental Team.  Due to timing of Month 01 period end date, it's
unlikely there will be many March hours requiring accrual.
Page 112

Page 113

Work Area Task Nbr Task Description 2022/23 Dates Lead Responsibility Monitored /
Actioned By
Comments
1.1 Equipment store stock take to be completed 31/03/2023 Equipment Store Manager Elizabeth Abbie to liaise with equipment store manager
1.2 Cut off date for submission of stock certificate and
detailed working papers to IS Finance Team
07/04/2023 Equipment Store Manager Elizabeth Abbie to liaise with equipment store manager
1.3 Cut off date for checking, signing and submission of
stock certificates to Corporate Accounting
14/04/2023 Principal Accountant - Social
Work
Elizabeth and
Lorna
Check and agree stock certificate
1.4 Calculate net movement in the value of equipment
owned by the SW Equipment Store and provide to
Principal Accountant - Social Work
14/04/2023 Principal Accountant - Social
Work
Elizabeth and
Lorna
Calculate the movement in the stock value and supply to
Linda Taylor
2.1 Cut off date for submission of 2022/23 supplier
invoices to creditors
24/03/2023 Department Elizabeth and
Lorna
E-mail to areas to remind them about deadline
2.2 Cut off date for processing of 2022/23 SW supplier
invoices through payables
30/03/2023 Creditors Section Creditors Malcolm to let Lorna know when all SW batches are
processed
2.3 Final cheque run processed involving SW invoices 30/03/2023 Creditors Section Creditors Malcom to let Lorna know when payrun is posted to general
ledger
3.1 Accrued/Prepaid expenditure templates issued to
department
01/02/2023 Finance Support Team Astrid
3.2 IS Finance Team issue accrual/prepayment calculation
templates to department
06/03/2023 SW Finance Team Elizabeth and
Lorna
3.3 Department completes accrued/prepaid expenditure
template
31/03/2023-
11/04/2023
Department Finance Contacts Provide support to admin and budget holders as necessary,
monitor progress. Evidence only required for charges of £5k
or more.
3.4 Accrued/prepaid expenditure template submitted to
IS Finance Team for checking and consolidation
11/04/2023 - 5pm Department Alistair, Alison and
Karen
Make sure that all of the area service's templates have been
returned
3.5 Cut off date for checking and consolidation of
accrued/prepaid expenditure templates for SW
14/04/2023 - 3pm SW Finance Team Elizabeth and
Lorna
Review templates and backup
4.1 Issue SW PECOS reports to finance contacts for review
and follow-up on queries with budget holders.
14/03/2023 SW Finance Team Elizabeth Request report from PECOS Administrator. Issue with other
year end documents and guidance
4.2 Mismatches to be cleared from PECOS system 29/03/2023 Department Alistair, Karen and
Alison
Monitor progress of requisitioners
4.3 Unpaid PECOS orders report to be issued to IS Finance
Team for inclusion on accruals template
04/04/2023 Finance Support Team Astrid
4.4 PECOS accruals to be added to central template 14/04/2023 - 3pm SW Finance Team Alistair
Appendix 3 - Health and Social Care Partnership Timetable
1. Stores & Work in
Progress
2. Creditors Payments
3. Revenue Accruals
4. PECOS
Page 113

Page 114

Work Area Task Nbr Task Description 2022/23 Dates Lead Responsibility Monitored /
Actioned By
Comments
5.1 Cut off date for processing debtors invoices in
2022/23
29/03/2023 Department Elizabeth and
Lorna
Include in year end instructions and issue reminder e-mail.
Alistair and Alison to prepare year end recharges to NHS
5.2 Cut off date for preparing residential and non-
residential care debtors accruals
14/04/2023 - 3pm SW Finance Team Moira and Alison
5.3 Calculate adjustment to bad debt provision 14/04/2023 Debtors Team Corporate Should be completed by F Walker / D Forshaw - check to
ensure that correct split between Council and IJB is in place
for debt before and after 01/04/2016.
6. Payroll 6.1 Payroll 07 accrual prepared 19/04/2023 Finance Support Team Lorna Astrid to let Lorna know when completed
7.1 Cut off for processing of charges to be charged to
2022/23
29/03/2023 Department Elizabeth and
Lorna
Instruction in year end guidance and e-mail reminder.
7.2 Final payables interface generated from CareFirst 30/03/2023 SW Finance Team Karen
7.3 Snapshot of outstanding transactions taken from
CareFirst
30/03/2023 SW Finance Team Karen Run year end reports for homecare, residential care,  direct
payments, fostering and adoption
7.4 Recommence processing of invoices via CareFirst - all
to be charged to April 2023/24 with year end
adjustments processed via accrued/prepaid
expenditure templates
04/04/2023 Department / Creditors Karen Instruction in year end guidance and e-mail reminder
8. Long Term Debt -
Charging Orders
8.1 Prepare charging order journal entries and agree with
Corporate Team
14/04/2023 SW Finance Team Lorna
9. TOTAL System Charges 9.1 Check that TRANMAN interface has been run for SW
vehicles.
21/04/2023 Fleet Team Tranman To be confirmed with Cara/Tranman when run has been
processed
10.1 Take snapshot of general ledger following payrun
including last of the SW supplier invoices being
processed into 2022/23
03/04/2023 SW Finance Team Lorna and
Elizabeth
10.2 Create consolidation template to produce outturn 03/04/2023 SW Finance Team Lorna
10.3 Report outturn position to James and Kirsty 24/04/2023 SW Finance Team Lorna Pass figure to James Gow, IJB CFO
5. Debtors
10. Consolidation
7. CareFirst
Page 114

Page 115

ARGYLL AND BUTE COUNCIL AUDIT AND SCRUTINY COMMITTEE
FINANCIAL SERVICES 16 MARCH 2023
TREASURY MANAGEMENT STRATEGY STATEMENT AND ANNUAL INVESTMENT
STRATEGY 
1.  EXECUTIVE SUMMARY 
1.1 The Council has adopted the Chartered Institute of Public Finance and
Accountancy (CIPFA) Code of Practice on Treasury Management in Local
Authorities.  A requirement of the Code is for an annual Treasury Management
Strategy Statement and Investment Strategy to be approved by Council for the
forthcoming financial year. This report seeks Member’s endorsement of the
proposed Treasury Management Strategy Statement and Annual Investment
Strategy.  The report also sets out the policy for the repayment of loans fund
advances for 2023-24.   
1.2 If the Audit and Scrutiny Committee identify any recommendations in relation to
the strategy these will be presented to full Council on 27 April 2023. 
1.3 The Council uses Link Group Treasury Solutions as its external treasury
management advisors.  The Council recognises that there is value in employing
external providers of treasury management services in order to acquire access
to specialist skills and resources. The Council will ensure that the terms of their
appointment and the methods by which their value will be assessed are properly
agreed and documented, and subject to regular review. 
1.4 Section 2 of the attached document outlines the Council’s Capital Prudential and
Treasury Indicators which Members are asked to endorse. 
1.5 In 2016 new regulations were enacted by the Scottish Parliament, the Local
Authority (Capital Finance and Accounting) (Scotland) Regulations 2016, under
which the Council is required to set out its policy for the statutory repayment of
loans fund advances prior to the start of the financial year as detailed in section
2.6 of the strategy. The policy on repayment of loans fund advances in respect of
capital expenditure by the Council is to ensure that the Council makes a prudent
provision each year to pay off an element of the accumulated loans fund
advances made in previous financial years.     
1.6  A review of the Council’s loan fund advance repayments was undertaken in
2019-20 with advice from our external treasury management advisors. The
review was undertaken to ensure the Council continues to make a prudent
provision each year for the repayment of loans fund advances. 
1.7 The review considered new loans fund advances and historic loans fund
advances to assess whether the repayment methodology was still the most
prudent option.  In doing so a revised policy on loans fund advance repayment
profiling was introduced as follows: 
For all new loans fund advances the policy for repayment is:
Page 115 Agenda Item 11

Page 116

o Asset life method – loans fund advances will be repaid with reference
to the life of an asset using a 5.1% annuity rate; 
o Funding / Income profile method – loans fund advances will be
repaid by reference to an associated income stream using a 5.1%
annuity rate. This would be utilised where the asset will generate
income which can be used to repay the debt or as a result of spend to
save schemes where again the savings can be used to repay the
loans fund advances.  
1.8 
1.9 
During 2022-23 a decision was taken to repay three of our loans early to take
advantage of a discount which was on offer. This has provided the Council with a
one-off gain of £5.397m which will be transferred to the General Fund and can
assist with budget pressures. 
Section 3 of the document outlines the current actual external debt against the
capital financing requirement highlighting any over or under borrowing. There is
information on the interest rates projections and the borrowing strategy.   
1.10 Section 4 of the document outlines the annual investment strategy.  The
Council’s investment priorities will be security first, liquidity second and then
return. It explains the creditworthiness policy and the use of Link Group Treasury
Solutions in this respect as well as the Country and Sector limits. 
1.11  There are a number of appendices in Section 5.  Some of this information has
been provided by the Council’s external treasury management advisors.   
2. RECOMMENDATIONS 
2.1 Members are requested to: 
a) Endorse the proposed Treasury Management Strategy Statement and
Annual Investment Strategy and the indicators contained within. 
b) Note the continued use of the asset life method for the repayment of loan
fund advances using a 5.1% annuity interest rate, with the exception of
spend to save schemes where the funding/income profile method could
be used. 
c) Note the proposed asset repayment periods as detailed within section 2.7
of the Treasury Management Strategy Statement. 
d) Note the ability to continue to use countries with a sovereign rating of AA-
and above, as recommended by the Council’s external treasury
management advisors.   
3. IMPLICATIONS 
3.1 Policy – Sets the policy for borrowing and investment decisions. 
3.2 Financial – An effective Treasury Management Strategy forms a significant part
of the Council’s financial arrangements and its financial well-being.
Page 116

Page 117

3.3 Legal - None.
3.4 HR - None.
3.5
3.5.1
3.5.2
3.5.3
Fairer Scotland Duty – None.
Equalities – None.
Socio-Economic Duty – None.
Islands Duty – None.
3.6 Climate Change – None.
3.7 Risk - This report does not require any specific risk issues to be addressed,
however members will be aware that the management of risk is an integral part
of the Council’s treasury management activities.
3.8 Customer Service - None.
Kirsty Flanagan
Executive Director/Section 95 Officer
9 February 2023
Policy Lead for Finance and Commercial Services: Councillor Gary
Mulvaney
APPENDICES
Appendix 1 – Treasury Management Strategy Statement and Annual
Investment Strategy 2023-24
For further information please contact:
Anne Blue, Head of Financial Services 01586-555269
Page 117

Page 118

1 
Treasury Management Strategy Statement
and Annual Investment Strategy 2023-2024 
Page 118

Page 119

2 
1 INDEX 
1 INTRODUCTION ............................................................................................................................ 3
1.1 Background ......................................................................................................................................................... 6
1.2 Treasury Management Reporting ...................................................................................................................... 6
1.3 Treasury Management Strategy for 2023/24 ..................................................................................................... 7
1.4 Training  ............................................................................................................................................................. 8
1.5 Treasury management advisors ........................................................................................................................ 8
2 CAPITAL PRUDENTIAL AND TREASURY INDICATORS 2023/24 – 2025/26 ....................... 9
2.1 Capital Expenditure and Financing .................................................................................................................... 9
2.2 The Council’s Overall Borrowing Need (the Capital Financing Requirement) ............................................... 10
2.3 Liability Benchmark ........................................................................................................................................... 10
2.4 Core funds and expected investment balances .............................................................................................. 10
2.5 Limits to Borrowing Activity ............................................................................................................................... 12
2.6  Statutory repayment of loans fund advances ................................................................................................. 13
2.7  Asset Repayment Periods ............................................................................................................................... 13
3 TREASURY MANAGEMENT STRATEGY ............................................................................... 14
3.1 Current portfolio position ................................................................................................................................... 14
3.2 Prospects for interest rates ............................................................................................................................... 16
3.3 Investment and borrowing rates ....................................................................................................................... 17
3.4 Borrowing strategy ............................................................................................................................................ 17
3.5 Policy on borrowing in advance of need .......................................................................................................... 18
3.6 Debt rescheduling ............................................................................................................................................. 18
3.7 New financial institutions as a source of borrowing and/or types of borrowing .............................................. 19
3.7 Approved sources of long and short term borrowing ...................................................................................... 19
4 ANNUAL INVESTMENT STRATEGY ........................................................................................ 20
4.1 Investment policy .............................................................................................................................................. 20
4.2 Creditworthiness policy ..................................................................................................................................... 21
4.3 Country and sector limits .................................................................................................................................. 21
4.4 Investment strategy .......................................................................................................................................... 21
4.5 Investment risk benchmarking ......................................................................................................................... 23
4.6 End of year Investment Report ........................................................................................................................ 23
4.7 Policy on environmental, social and governance (E.S.G.) .............................................................................. 23
5 APPENDICES .............................................................................................................................. 24
Appendix 1 – Capital Prudential and Treasury Indicators 2023/24 – 2025/26 ..................................................... 24
Appendix 2 – Detailed Current Portfolio Position ................................................................................................... 27
Appendix 3 – Interest Rate Forecasts 2023 - 2026 and Commentary ................................................................. 28
Appendix 4 – Economic Background Provided by Link Treasury Services (at 08.12.22).................................... 29
Appendix 5 - Treasury Management Practice (TMP1) Permitted Investments .................................................... 32
Appendix 6 – Treasury Management Practice (TMP2) Credit and Counterparty Risk Management ................. 41
Appendix 7 – Creditworthiness policy .................................................................................................................... 47
Appendix 8 – Approved Countries for Investments (at 08.12.22) ......................................................................... 49
Appendix 9 – Treasury Management Scheme of Delegation ............................................................................... 50
Appendix 10 – The Treasury Management Role of the Section 95 Officer .......................................................... 51
Appendix 11 - Policy on environmental, social and governance (E.S.G)  ............................................................ 53 
Page 119

Page 120

3 
1 INTRODUCTION (Key Considerations)
2021 revised CIPFA Treasury Management Code and Prudential Code – changes which will impact
on future TMSS/AIS reports and the risk management framework
CIPFA published the revised Codes on 20th December 2021 and has stated that revisions need to be
included in the reporting framework from the 2023/24 financial year. This Authority, therefore, has to have
regard to these Codes of Practice when it prepares the Treasury Management Strategy Statement and
Annual Investment Strategy, and also related reports during the financial year, which are taken to Full
Council for approval. 
The revised Treasury Management Code requires all investments and investment income to be
attributed to one of the following three purposes: - 
Treasury management
Arising from the organisation’s cash flows or treasury risk management activity, this type of
investment represents balances which are only held until the cash is required for
use.  Treasury investments may also arise from other treasury risk management activity
which seeks to prudently manage the risks, costs or income relating to existing or forecast
debt or treasury investments. 
Service delivery
Investments held primarily and directly for the delivery of public services including housing,
regeneration and local infrastructure.  Returns on this category of investment which are
funded by borrowing are permitted only in cases where the income is “either related to the
financial viability of the project in question or otherwise incidental to the primary purpose”. 
Commercial return
Investments held primarily for financial return with no treasury management or direct service
provision purpose.  Risks on such investments should be proportionate to an authority’s
financial capacity – i.e., that ‘plausible losses’ could be absorbed in budgets or reserves
without unmanageable detriment to local services. An authority must not borrow to invest
primarily for financial return. 
The revised Treasury Management Code will require an authority to implement the following: - 
1. Adopt a new liability benchmark treasury indicator to support the financing risk
management of the capital financing requirement; this is to be shown in chart form for a
minimum of ten years, with material differences between the liability benchmark and actual
loans to be explained; 
2. Long-term treasury investments, (including pooled funds), are to be classed as
commercial investments unless justified by a cash flow business case; 
3. Pooled funds are to be included in the indicator for principal sums maturing in years beyond
the initial budget year; 
4. Amendment to the knowledge and skills register for officers and members involved in the
treasury management function - to be proportionate to the size and complexity of the
treasury management conducted by each authority; 
5. Reporting to members is to be done quarterly.  Specifically, the Chief Finance Officer
(CFO) is required to establish procedures to monitor and report performance against all
forward-looking prudential indicators at least quarterly. The CFO is expected to establish a
measurement and reporting process that highlights significant actual or forecast deviations
Page 120

Page 121

4 
from the approved indicators.  However, monitoring of prudential indicators, including
forecast debt and investments, is not required to be taken to Full Council and should be
reported as part of the Authority’s integrated revenue, capital and balance sheet monitoring; 
6. Environmental, social and governance (ESG) issues to be addressed within an authority’s
treasury management policies and practices (TMP1). 
The main requirements of the Prudential Code relating to service and commercial investments are: - 
1. The risks associated with service and commercial investments should be
proportionate to their financial capacity – i.e. that plausible losses could be absorbed
in budgets or reserves without unmanageable detriment to local services; 
2. An authority must not borrow to invest for the primary purpose of commercial return; 
3. It is not prudent for local authorities to make any investment or spending decision that
will increase the CFR, and so may lead to new borrowing, unless directly and primarily
related to the functions of the authority, and where any commercial returns are either
related to the financial viability of the project in question or otherwise incidental to the
primary purpose; 
4. An annual review should be conducted to evaluate whether commercial investments
should be sold to release funds to finance new capital expenditure or refinance
maturing debt; 
5. A prudential indicator is required for the net income from commercial and service
investments as a proportion of the net revenue stream; 
6. Create new Investment Management Practices to manage risks associated with non-
treasury investments, (similar to the current Treasury Management Practices). 
An authority’s Annual Investment Strategy should include: - 
1. The authority’s approach to investments for service or commercial purposes (together
referred to as non-treasury investments), including defining the authority’s objectives,
risk appetite and risk management in respect of these investments, and processes
ensuring effective due diligence; 
2. An assessment of affordability, prudence and proportionality in respect of the
authority’s overall financial capacity (i.e. whether plausible losses could be absorbed
in budgets or reserves without unmanageable detriment to local services); 
3. Details of financial and other risks of undertaking investments for service or
commercial purposes and how these are managed; 
4. Limits on total investments for service purposes and for commercial purposes
respectively (consistent with any limits required by other statutory guidance on
investments); 
5. Requirements for independent and expert advice and scrutiny arrangements (while
business cases may provide some of this material, the information contained in them
will need to be periodically re-evaluated to inform the authority’s overall strategy); 
6. State compliance with paragraph 51 of the Prudential Code in relation to investments
for commercial purposes, in particular the requirement that an authority must not
borrow to invest primarily for financial return; 
Page 121

Page 122

5 
As this Treasury Management Strategy Statement and Annual Investment Strategy deals solely
with treasury management investments, the categories of service delivery and commercial
investments should be addressed as part of the Capital Strategy report. 
However, as investments in commercial property have implications for cash balances managed by
the treasury team, it will be for each authority to determine whether to add a high level summary of
the impact that commercial investments have, or may have, if it is planned to liquidate such
investments within the three year time horizon of this report, (or a longer time horizon if that is felt
appropriate).  
Page 122

Page 123

6 
1.1 Background
The Council is required to operate a balanced budget, which broadly means that cash raised during the year
will meet cash expenditure.  Part of the treasury management operation is to ensure that this cash flow is
adequately planned, with cash being available when it is needed.  Surplus monies are invested in low risk
counterparties or instruments commensurate with the Council’s low risk appetite, providing adequate liquidity
initially before considering investment return. 
The second main function of the treasury management service is the funding of the Council’s capital plans. 
These capital plans provide a guide to the borrowing need of the Council, essentially the longer term cash flow
planning to ensure that the Council can meet its capital spending obligations.  This management of longer term
cash may involve arranging long or short term loans, or using longer term cash flow surpluses.   On occasion,
when it is prudent and economic, any debt previously drawn may be restructured to meet Council risk or cost
objectives.  
The contribution the treasury management function makes to the authority is critical, as the balance of debt and
investment operations ensure liquidity or the ability to meet spending commitments as they fall due, either on
day-to-day revenue or for larger capital projects.  The treasury operations will see a balance of the interest costs
of debt and the investment income arising from cash deposits affecting the available budget.  Since cash
balances generally result from reserves and balances, it is paramount to ensure adequate security of the sums
invested, as a loss of principal will in effect result in a loss to the General Fund Balance. 
CIPFA defines treasury management as: 
“The management of the local authority’s borrowing, investments and cash flows, its banking, money market
and capital market transactions; the effective control of the risks associated with those activities; and the pursuit
of optimum performance consistent with those risks.” 
Whilst any commercial initiatives or loans to third parties will impact on the treasury function, these activities are
generally classed as non-treasury activities, (arising usually from capital expenditure), and are separate from
the day-to-day treasury management activities.
1.2 Treasury Management reporting
The Council is required to receive and approve, as a minimum, three main reports each year, which
incorporate a variety of policies, estimates and actuals. 
An Annual Treasury Management Strategy Statement (this report) – this is the first and most important
report which is submitted to full Council before the start of the financial year.  The Council approve this
Strategy in February, after which the Audit and Scrutiny Committee have an opportunity to make
comments and recommendations. If required the Strategy would then go back to Council in April to
approve any amendments recommended by the Audit and Scrutiny Committee.  The Strategy  covers:
 The capital plans (including prudential indicators);
 A policy for the statutory repayment of debt, (how residual capital expenditure is charged to
revenue over time);
 The Treasury Management Strategy (how the investments and borrowings are to be organised)
including treasury indicators; and 
 An Annual Investment strategy (the parameters on how investments are be to managed).   
A mid-year Treasury Management Review Report - this will update Members with the progress on the
capital position, amending prudential indicators as necesssary and whether any policies require revision.  
Monitoring reports are submitted to each Policy and Resources Committee. 
Page 123

Page 124

7 
An Annual Treasury Report – this provides details of a selection of actual prudential and treasury
indicators and actual treasury operations compared to the estimates within the strategy.  This report is
presented to Council after the end of each financial year. 
Capital Strategy
The CIPFA 2021 Prudential and Treasury Management Codes require all local authorities to prepare a
capial strategy report, which will provide the following: 
 a high-level overview of how capital expenditure, capital financing and treasury management activity
contribute to the provision of services
 an overview of how the associated risk is managed
 the implications for future financial sustainability. 
The aim of this capital strategy is to ensure that all elected members on the full council fully understand the
overall long-term policy objectives and resulting capital strategy requirements, governance procedures and risk
appetite.  The capital strategy was initially reported to members on 14 October 2021 and the decision taken that
an updated strategy be presented to members in the early life of the new Council in 2022.  During 2022 elected
members were asked to set their priotities for the capital programme and an amended capital strategy has been
prepared and will now go forward to full Council for approval. 
1.3 Treasury Management Strategy for 2023/24
The strategy for 2023/24 covers two main areas: 
Capital issues
 the capital expenditure plans and the associated prudential indicators.
 the policy for statutory repayment of loans fund advances 
Treasury management issues
 the current treasury position;
 treasury indicators which limit the treasury risk and activities of the Council;
 prospects for interest rates;
 the borrowing strategy;
 policy on borrowing in advance of need;
 debt rescheduling;
 the investment strategy;
 creditworthiness policy; and
 policy on use of external service providers. 
These elements cover the requirements of the Local Government in Scotland Act 2003, the CIPFA
Prudential Code, the CIPFA Treasury Management Code and Scottish Government loans fund
repayment regulations and investment regulations, particularly Finance Circulars 5/2010 and
7/2016. 
Page 124

Page 125

8 
1.4 Training
The CIPFA Code requires the responsible officer to ensure that Members with responsibility for treasury
management receive adequate training in treasury management.  This especially applies to Members
responsible for scrutiny (Audit and Scutiny Committee).
Furthermore, pages 47 and 48 of the Code state that they expect “all organisations to have a formal and
comprehensive knowledge and skills or training policy for the effective acquisition and retention of treasury
management knowledge and skills for those responsible for management, delivery, governance and decision
making.
The scale and nature of this will depend on the size and complexity of the organisation’s treasury management
needs.  Organisations should consider how to assess whether treasury management staff and board/ council
members have the required knowledge and skills to undertake their roles and whether they have been able to
maintain those skills and keep them up to date. 
As a minimum, authorities should carry out the following to monitor and review knowledge and skills: 
 Record attendance at training and ensure action is taken where poor attendance is
identified. 
 Prepare tailored learning plans for treasury management officers and board/council
members. 
 Require treasury management officers and board/council members to undertake self-
assessment against the required competencies (as set out in the schedule that may
be adopted by the organisation). 
 Have regular communication with officers and board/council members, encouraging
them to highlight training needs on an ongoing basis.” 
In further support of the revised training requirements, CIPFA’s Better Governance Forum and Treasury
Management Network have produced a ‘self-assessment by members responsible for the scrutiny of
treasury management’, which is available from the CIPFA website to download. 
The training needs of treasury management officers are periodically reviewed. 
A formal record of the training received by officers central to the Treasury function will be maintained. 
Similarly, a formal record of the treasury management/capital finance training received by members will
also be maintained.
1.5 Treasury management consultants
The Council uses Link Treasury Services as its external treasury management consultants.
The Council recognises that responsibility for treasury management decisions remains with the organisation at
all times and will ensure that undue reliance is not placed upon the services of our external service providers.
All decisions will be undertaken with regards to all available information, including, but not solely, our treasury
advisers.
It also recognises that there is value in employing external providers of treasury management services in order
to acquire access to specialist skills and resources. The Council will ensure that the terms of their appointment
and the methods by which their value will be assessed are properly agreed and documented, and subjected to
regular review. 
Page 125

Page 126

9 
2 CAPITAL PRUDENTIAL AND TREASURY INDICATORS 2023/24 –
2025/26 
The Council’s capital expenditure plans are the key driver of treasury management activity.  The output
of the capital expenditure plans are reflected in the prudential indicators, which are designed to assist
Members’ overview and confirm capital expenditure plans.
2.1 Capital Expenditure and Financing
This prudential indicator is a summary of the Council’s capital expenditure plans, both those agreed
previously, and those forming part of the 2023/24 budget setting. 
The table below summarises the capital expenditure plans as outlined within the proposed capital plan
2023-26.
Capital Expenditure 2021/22 2022/23 2023/24 2024/25 2025/26
£'000 Actual Estimate Estimate Estimate Estimate
Executive Director - Douglas Hendry
Education 7,798 7,155 6,970 2,226 2,219
Facility Services - Shared Offices 819 2,929 2,492 428 427
Major Projects/CHORD 11,598 4,558 1,351 0 0
Executive Director - Kirsty Flanagan
ICT 1,538 1,289 1,258 771 768
Roads and Infrastructure 18,209 25,436 46,349 33,028 34,514
Development and Economic Growth 2,690 4,282 1,274 0 0
Live Argyll 324 560 1,106 428 427
Health and Social Care Partnership 0 628 1,920 428 427
Total 42,976 46,837 62,720 37,309 38,782 
The table below summarises the above capital expenditure plans and how capital or revenue resources
are financing them.  Any shortfall of resources results in a funding borrowing need. (The financing need
excludes other long-term liabilities, such as PFI and leasing arrangements, which already include
borrowing instruments.) 
Capital Expenditure 2021/22 2022/23 2023/24 2024/25 2025/26
£'000 Actual Estimate Estimate Estimate Estimate
Total Capital Expenditure 42,976 46,837 62,720 37,309 38,782
Financed by:
Capital Receipts 835 500 1,195 350 400
Capital Grants 21,700 17,180 16,822 9,277 9,129
Capital Reserves 0 0 0 0 0
Revenue 735 21,402 1,593 1,331 0
Net Financing need for the year 19,706 7,755 43,110 26,351 29,253 
Page 126

Page 127

10 
2.2  The Council’s Overall Borrowing Need (the Capital Financing Requirement)
The second prudential indicator is the Council’s Capital Financing Requirement (CFR).  The CFR is simply
the total historic outstanding capital expenditure which has not yet been paid for from either revenue or
capital resources.  It is essentially a measure of the Council’s underlying borrowing need.
Any capital expenditure above, which has not immediately been paid for through a revenue or capital
resource, will increase the CFR.
The CFR does not increase indefinitely, as prudent annual repayments from revenue need to be made,
called the Loan Fund Principal Repayment, which reflects the useful life of capital assets financed by
borrowing.  This charge reduces the CFR each year.  From 1 April 2016, authorities may choose whether
to use scheduled debt amortisation, (loans pool charges), or another suitable method of calculation in
order to repay borrowing.  
The CFR includes any other long-term liabilities (e.g. PFI schemes, finance leases).  Whilst these increase
the CFR, and therefore the Council’s borrowing requirement, these types of scheme include a borrowing
facility and so the Council is not required to separately borrow for these schemes.  The Council currently
has £116.7m of such schemes within the CFR.
The CFR projections are noted in the following table. 
2021/22 2022/23 2023/24 2024/25 2025/26
£'000 Actual Estimate Estimate Estimate Estimate
Capital Financing Requirement          
Opening CFR 294,752 307,100 304,498 372,359 386,984
Closing CFR 307,100 304,498 372,359 386,984 403,919
Movement in CFR 12,348 (2,602) 67,861 14,625 16,935        
Movement in CFR represented by            
2021/22 2022/23 2023/24 2024/25 2025/26
£'000 Actual Estimate Estimate Estimate Estimate
Net financing need for the year
(above) 19,706 7,755 43,110 26,351 29,253
Service Concessions Adjustment     36,038 0 0
Less scheduled debt Amortisation 7,358 10,357 11,287 11,726 12,318
Movement in CFR 12,348 (2,602) 67,861 14,625 16,935 
2.3 Liability Benchmark
A third and new prudential indicator for 2023/24 is the Liability Benchmark (LB).  The Authority is
required to estimate and measure the LB for the forthcoming financial year and the following two
financial years, as a minimum. 
There are four components to the LB: -
Page 127

Page 128

11 
1 Existing loan debt outstanding: the Authority’s existing loans that are still outstanding in
future years.  
2 Loans CFR: this is calculated in accordance with the loans CFR definition in the Prudential
Code and projected into the future based on approved prudential borrowing and planned
Loans Fund advances/Loans Fund principal repayments. 
3 Net loans requirement: this will show the Authority’s gross loan debt less treasury
management investments at the last financial year-end, projected into the future and
based on its approved prudential borrowing, planned Loans Fund principal repayments
and any other major cash flows forecast. 
4 Liability benchmark (or gross loans requirement): this equals net loans requirement plus
short-term liquidity allowance. 
The graph below shows the four components for the Council: 
2.4 Core Funds and Expected Investment Balances 
The application of resources (capital receipts, reserves etc.) to either finance capital expenditure or
other budget decisions to support the revenue budget will have an ongoing impact on investments
unless resources are supplemented each year from new sources (asset sales etc.).  Detailed below are
estimates of the year-end balances for each resource and anticipated day-to-day cash flow balances. 
Year End Resources 2021/22 2022/23 2023/24 2024/25 2025/26
£'000 Actual Estimate Estimate Estimate Estimate
Expected Investments 102,228 80,000 70,000 50,000 50,000
Page 128

Page 129

12 
2.5  Limits to Borrowing Activity
The operational boundary:  This is the limit beyond which external debt is not normally expected to
exceed.  In most cases, this would be a similar figure to the CFR, but may be lower or higher depending
on the levels of actual debt and the ability to fund under-borrowing by other cash resources. 
Operational Boundary 2021/22 2022/23 2023/24 2024/25 2025/26
£'m Actual Actual Estimate Estimate Estimate
Debt 188 190 263 278 300
Other long term liabilities 119 115 109 110 105
Total 307 305 372 388 405
The authorised limit for external debt.  This is a key prudential indicator and represents a control on
the maximum level of borrowing. This represents a legal limit beyond which external debt is prohibited,
and this limit needs to be set or revised by the full Council.  It reflects the level of external debt which,
while not desired, could be afforded in the short term, but is not sustainable in the longer term.  
a) The authorised limits for external debt for the current year and two subsequent years are the
legislative limits determined under Regulation 6(1) of the Local Authority (Capital Finance and
Accounting) (Scotland) Regulations 2016.
b) The Council is asked to approve the following authorised limit: 
Authorised Limit 2021/22 2022/23 2023/24 2024/25 2025/26
£'m Actual Actual Estimate Estimate Estimate
Debt 193 195 268 283 305
Other long term liabilities 122 118 112 113 108
Total 315 313 380 396 413
Page 129

Page 130

13 
2.6  Statutory repayment of loans fund advances
The Council is required to set out its policy for the statutory repayment of loans fund advances prior to the start
of the financial year. The repayment of loans fund advances ensures that the Council makes a prudent provision
each year to pay off an element of the accumulated loans fund advances made in previous financial years.  
A variety of options are provided to Councils so long as a prudent provision is made each year.  A review of the
Council’s loan fund advances was undertaken during 2019-20 to ensure the Council continues to make a
prudent provision each year for the repayment of loans fund advances.
For all new loans fund advances the policy for the repayment is:- 
1.      Asset life method – loans fund advances will be repaid with reference to the life of an asset using
a 5.1% annuity rate;  
2.      Funding / Income profile method – loans fund advances will be repaid by reference to an
associated income stream. 
The annuity rate applied to current loans fund repayments is based on historic interest rates over a 15 year
period ensuring that a prudent rate is used. The current rate is 3.41%, however it is still considered prudent to
use the average historic rate at this time. 
2.7 Asset Repayment Periods
Using the asset life method, the Council is required to ensure that the debt is repaid over a period that is
reasonably commensurate with that over which the capital expenditure provides benefits. 
The table below details the repayment period that applies for each asset type. 
Asset Type
Repayment
Period
(Years)
Land (including cemeteries) 100
Road Structures - Bridges, Retaining Walls, Sea Walls, Flood Defences 60
Piers and Harbours - Major Structural Work 60
Piers and Harbours - Medium Term Works e.g painting/cathodic protection 20
Piers and Harbours - Limited Lifespan Improvements 10
Roads and Footways 20
Street Lighting 30
Vehicles & Plant 7
IT Equipment 5
Major Regeneration Works (Public Realm etc) 60
New Builds including Schools 60
Buildings -  Electrical 40
Buildings -  Plant 20
Buildings - Roofing 35
Buildings - Windows & External Doors 20
Buildings - Structural 25
Page 130

Page 131

14 
3 TREASURY MANAGEMENT STRATEGY
The capital expenditure plans set out in Section 2 provide details of the service activity of the Council.  The
treasury management function ensures that the Council’s cash is organised in accordance with the the relevant
professional codes, so that sufficient cash is available to meet this service activity.  This will involve both the
organisation of the cash flow and, where capital plans require, the organisation of approporiate borrowing
facilities.  The strategy covers the relevant treasury / prudential indicators, the current and projected debt positions
and the Annual Investment Strategy.
3.1 Current portfolio position
The Council’s treasury portfolio position at 31 March 2022 and at 31 December 2022 are shown below for both
borrowing and investments. 
A more detailed analysis of the above table showing actual investments placed with individual counterparties
can be found in Appendix 2. 
Actual Actual Current Current
31.3.22 31.3.22 31.12.22 31.12.22
Treasury investments £000 %  £000 % 
Banks 70,117 63% 51,921 50%
Building Societies - rated 0 0% 0 0%
Local Authorities 17,500 16% 42,500 41%
Money Market Funds 19,600 18% 4,700 5%
Certificates of Deposit 0 0% 0 0%
Third Party Loans 3,789 3% 3,694 4%
Total managed in house 111,006 100% 102,815 100%
Bond Funds 0 0% 0 0%
Property Funds 0 0% 0 0%
Total managed externally 0 0% 0 0%
Total Treasury Investments 111,006 100% 102,815 100%
Treasury external borrowing
PWLB 118,145 66% 84,273 58%
LOBOs 39,255 22% 39,255 27%
Market 10,000 6% 10,000 7%
Special 10 0% 8 0%
Temporary Borrowing 10,500 6% 10,540 7%
Local Bonds 24 0% 18 0%
Total External Borrowing 177,934 100% 144,094 100%
Net Treasury Investments /
(Borrowing) (66,928) (41,279)
TREASURY PORTFOLIO
Page 131

Page 132

15 
The Council’s forward projections for borrowing, are  summarised below. The table shows the actual external debt
(the treasury management operations), against the underlying capital borrowing need (the Capital Financing
Requirement - CFR), highlighting any over or under borrowing. 
2021/22 2022/23 2023/24 2024/25 2025/26
£'000 Actual Estimate Estimate Estimate Estimate
External Debt
Debt as 1st April 168,805 177,934 142,158 176,154 221,135
Change in Debt (In Year) 9,129 (35,776) 33,996 44,981 39,997
Other long-term liabilities (OLTL) at 1st
April 121,524 118,931 114,088 108,971 109,191
Change in OLTL (In Year) (2,593) (4,843) (5,117) 220 (4,938)
Actual gross debt at 31st March 296,865 256,246 285,125 330,326 365,385
The Capital Financing Requirement 307,100 304,498 372,359 386,984 403,919
Under / (Over) borrowing 10,235 48,252 87,234 56,658 38,534 
The figures in the above tables  include an allowance for the introduction of IFRS16 – Leasing which is being
introduced in the 24/25 financial year, having been deferred in December 2021. The change requires local authorities
to account for leased assets previously treated as operating leases (off balance sheet) as finance leases (on balance
sheet), which increases capital expenditure and the gross debt required to finance them.  Work is underway to
identify and evaluate the operating leases affected and, in the meantime, the figures used in the calculations above
represent a high level estimate of the potential impact on the Council’s Capital Financing Requirement.
The following graph shows the the CFR compared to the expected net debt in each of the years and the under /
(over) borrowed position, also shown is the Council’s authorised limit for debt and it’s operational boundary (see
paragraph 2.4 above.
Page 132

Page 133

16 
Within the prudential indicators there are a number of key indicators to ensure that the Council operates
its activities within well-defined limits.  One of these is that the Council needs to ensure that its gross debt
does not, except in the short term, exceed the total of the CFR in the preceding year plus the estimates of any
additional CFR for 2022/23 and the following two financial years.  This allows some flexibility for limited early
borrowing for future years, but ensures that borrowing is not taken for revenue or speculative purposes.      
The Section 95 Officer reports that the Council complied with this prudential indicator in the current year
and does not envisage difficulties for the future.  This view takes into account current commitments,
existing plans, and the proposals in this budget report.  
3.2 Prospects for interest rates
The Council has appointed Link Treasury Services as its treasury advisor and part of their service
is to assist the Council to formulate a view on interest rates. Link provided the following forecasts
on 8th December 2022.  These are forecasts for certainty rates, gilt yields plus 80 bps. 
Additional notes by Link on this forecast table: - 
Page 133

Page 134

17 
Our central forecast reflects a view that the Monetary Policy Committee (MPC) will be keen to
demonstrate its anti-inflation credentials by delivering a succession of rate increases.  This has
happened throughout 2022, but the new Government’s policy of emphasising fiscal rectitude will
probably mean Bank Rate does not now need to increase to further than 4.5%.
Further down the road, we anticipate the Bank of England will be keen to loosen monetary policy
when the worst of the inflationary pressures have lessened – but that timing will be one of fine
judgment: cut too soon, and inflationary pressures may well build up further; cut too late and any
downturn or recession may be prolonged.
The CPI measure of inflation will peak at close to 11% in Q4 2022.  Despite the cost-of-living
squeeze that is still taking shape, the Bank will want to see evidence that wages are not spiralling
upwards in what is evidently a very tight labour market.  Wage increases, excluding bonuses, are
currently running at 5.7%.
Regarding the plan to sell £10bn of gilts back into the market each quarter (Quantitative
Tightening), this has started but will focus on the short to medium end of the curve for the present. 
This approach will prevent any further disruption to the longer end of the curve following on from
the short-lived effects of the Truss/Kwarteng unfunded dash for growth policy.
In the upcoming months, our forecasts will be guided not only by economic data releases and
clarifications from the MPC over its monetary policies and the Government over its fiscal policies,
but the on-going conflict between Russia and Ukraine.  (More recently, the heightened tensions
between China/Taiwan/US also have the potential to have a wider and negative economic impact.)
On the positive side, consumers are still estimated to be sitting on over £160bn of excess savings
left over from the pandemic so that will cushion some of the impact of the above challenges.  
However, most of those are held by more affluent people whereas lower income families already
spend nearly all their income on essentials such as food, energy and rent/mortgage payments. 
Link Treasury Services have also provided commentary in relation to interest rates and this is included
within Appendix 3.
3.3 Investment and borrowing rates
Yield curve movements have become less volatile under the Sunak/Hunt government.  PWLB 5 to
50 years Certainty Rates are, generally, in the range of 3.75% to 4.50%.  The medium to longer part
of the yield curve is currently inverted (yields are lower at the longer end of the yield curve compared
to the short to medium end).
We view the markets as having built in, already, nearly all the effects on gilt yields of the likely
increases in Bank Rate and the poor inflation outlook but markets are volatile and further whipsawing
of gilt yields across the whole spectrum of the curve is possible. 
The current margins over gilt yields are as follows: -.
 PWLB Standard Rate is gilt plus 100 basis points (G+100bps)
 PWLB Certainty Rate is gilt plus 80 basis points (G+80bps)
 PWLB HRA Standard Rate is gilt plus 100 basis points (G+100bps)
 PWLB HRA Certainty Rate is gilt plus 80bps (G+80bps)
 Local Infrastructure Rate is gilt plus 60bps (G+60bps) 
Borrowing for capital expenditure. Our long-term (beyond 10 years) forecast for Bank Rate stands
at 2.5%. As all PWLB certainty rates are now above this level, borrowing strategies will need to be
reviewed in that context.  Better value can generally be obtained at the shorter end of the curve and
short-dated fixed LA to LA monies should be considered. Temporary borrowing rates are likely,
however, to remain near Bank Rate and may also prove attractive whilst the market waits for
inflation, and therein gilt yields, to drop back later in 2023. 
Page 134

Page 135

18 
While this authority will not be able to avoid borrowing to finance new capital expenditure, to replace
maturing debt and the rundown of reserves, there will be a cost of carry, (the difference between higher
borrowing costs and lower investment returns), to any new borrowing that causes a temporary increase
in cash balances.
3.4 Borrowing strategy 
The Council is currently maintaining an under-borrowed position.  This means that the capital borrowing
need, (the Capital Financing Requirement), has not been fully funded with loan debt as cash supporting
the Council’s reserves, balances and cash flow has been used as a temporary measure. This strategy is
prudent as medium and longer dated borrowing rates are expected to fall from their current levels once
prevailing inflation concerns are addressed by tighter near-term monetary policy.  That is, Bank Rate
increases over the remainder of 2022 and the first half of 2023.
Against this background and the risks within the economic forecast, caution will be adopted with the
2023/24 treasury operations. The Section 95 Officer will monitor interest rates in financial markets and
adopt a pragmatic approach to changing circumstances: 
 if it was felt that there was a significant risk of a sharp FALL in borrowing rates, then
borrowing will be postponed. 
 if it was felt that there was a significant risk of a much sharper RISE in borrowing rates than
that currently forecast, fixed rate funding will be drawn whilst interest rates are lower than
they are projected to be in the next few years.
Any decisions will be reported to the appropriate decision-making body at the next available opportunity.
3.5 Policy on borrowing in advance of need 
The Council will not borrow more than, or in advance of, its needs purely in order to profit from the investment
of the extra sum borrowed. Any decision to borrow in advance will be within forward approved Capital Financing
Requirement estimates, and will be considered carefully to ensure that value for money can be demonstrated
and that the Council can ensure the security of such funds. 
Risks associated with any borrowing in advance activity will be subject to prior appraisal and subsequent
reporting through the mid-year or annual reporting mechanism. 
3.6 Debt rescheduling
Rescheduling of current borrowing in our debt portfolio is unlikely to occur as there is still a very large
difference between premature redemption rates and new borrowing rates, 
In 2022, there was a window of opportunity, due to the volatility of interest rates, to repay some of its borrowing
early to take advantage of a discount on repayment.  Rescheduling of remaining borrowing in our debt portfolio
is not currently planned for in 2023/24.  However, the Council may consider rescheduling debt if an opportunity
arises and it is prudent to do so in terms of cash balances held and anticipated future interest rates.  If
rescheduling was done, it will be reported to the appropriate Committee at the earliest meeting following its
action. 
Page 135

Page 136

19 
3.7 New financial institutions as a source of borrowing and / or types of borrowing
Currently the PWLB Certainty Rate is set at gilts + 80 basis points for both HRA and non-HRA borrowing. 
However, consideration may still need to be given to sourcing funding from the following sources for the
following reasons: 
 Local authorities (primarily shorter dated maturities out to 3 years or so – still cheaper than
the Certainty Rate).
 Financial institutions (primarily insurance companies and pension funds but also some banks,
out of forward dates where the objective is to avoid a “cost of carry” or to achieve refinancing
certainty over the next few years).
Our advisors will keep us informed as to the relative merits of each of these alternative funding sources. 
3.8  Approved Sources of Long and Short term Borrowing 
A list of approved sources of long and short term borrowing is shown below: 
On Balance Sheet  Fixed Variable
PWLB  √ √
Municipal bond agency  √ √
Local authorities  √ √
Banks  √ √
Pension funds  √ √
Insurance companies  √ √
UK Infrastructure Bank  √ √    
Market (long-term)  √ √
Market (temporary)  √ √
Market (LOBOs)  √ √
Stock issues  √ √    
Local temporary  √ √
Local Bonds  √ 
Local authority bills                                                                   √ √
Overdraft   √
Negotiable bonds  √ √    
Internal (capital receipts & revenue balances)  √ √
Commercial paper  √ 
Medium Term Notes  √ 
Finance leases  √ √ 
Page 136

Page 137

20 
4 ANNUAL INVESTMENT STRATEGY
4.1 Investment policy
The Council’s investment policy implements the requirements of the Local Government Investments (Scotland)
Regulations 2010, (and accompanying Finance Circular 5/2010), and the CIPFA Treasury Management in
Public Services Code of Practice and Cross Sectoral Guidance Notes 2021, (“the Code”) and CIPFA Treasury
Management Guidance Notes 2021.   
The above regulations and guidance place a high priority on the management of risk. The Council’s
investment priorities will be security first, liquidity second and  then return. This authority has adopted a
prudent approach to managing risk and defines its risk appetite by the following means:
1. Minimum acceptable credit criteria are applied in order to generate a list of highly creditworthy
counterparties.  This also enables diversification and thus avoidance of concentration risk. The key ratings
used to monitor counterparties are the short term and long-term ratings.  
2. Other information: ratings will not be the sole determinant of the quality of an institution; it is important to
continually assess and monitor the financial sector on both a micro and macro basis and in relation to the
economic and political environments in which institutions operate. The assessment will also take account
of information that reflects the opinion of the markets. To achieve this consideration the Council will
engage with its advisors to maintain a monitor on market pricing such as “credit default swaps” and
overlay that information on top of the credit ratings. 
3. Other information sources used will include the financial press, share price and other such information
pertaining to the financial sector in order to establish the most robust scrutiny process on the suitability of
potential investment counterparties.
4. This Authority has defined the list of types of investment instruments that the treasury management
team are authorised to use. There are two lists in Appendix 5 under the categories of ‘specified’ and ‘non-
specified’ investments.Lending limits, (amounts and maturity), for each counterparty will be set through
applying the matrix table in Appendix 7.
5. Transaction limits are set for each type of investment in Appendix 5.
6. This authority will set a limit for the amount of its investments which are invested for longer than 365
days, (see paragraph 4.4).
7. Investments will only be placed with counterparties from countries with a specified minimum sovereign
rating, (see paragraph 4.3).
8. All investments will be denominated in sterling.
9. As a result of the change in accounting standards for 2021/22 under IFRS 9, this authority will consider
the implications of investment instruments which could result in an adverse movement in the value of the
amount invested and resultant charges at the end of the year to the General Fund. 
However, this authority will also pursue value for money in treasury management and will monitor the yield
from investment income against appropriate benchmarks for investment performance, (see paragraph 4.4).
Regular monitoring of investment performance will be carried out during the year. 
Page 137

Page 138

21 
4.2 Creditworthiness policy 
The Council recognises the vital importance of credit-worthiness checks on the counterparties it uses for
investments. 
This Council applies the creditworthiness service provided by  Link Treasury Services.  This service employs a
sophisticated modelling approach utilising credit ratings from the three main credit rating agencies - Fitch,
Moody’s and Standard and Poor’s.  The credit ratings of counterparies are supplemented with the following
further overlays:
 credit watches and credit outlooks from credit rating agencies;
 CDS spreads to give early warning of likely changes in credit ratings;
 sovereign ratings to select counterparties from only the most creditworthy countries.
Further explanation of the approach for creditworthiness used by Link Treasury Services is found in Appendix
7. 
UK banks – ring fencing
The largest UK banks, (those with more than £25bn of retail / Small and Medium-sized Enterprise (SME)
deposits), are required, by UK law, to separate core retail banking services from their investment and
international banking activities. This is known as “ring-fencing”. Whilst smaller banks with less than £25bn
in deposits are exempt, they can choose to opt in. 
Ring-fencing is a regulatory initiative created in response to the global financial crisis. It mandates the
separation of retail and SME deposits from investment banking, in order to improve the resilience and
resolvability of banks by changing their structure. In general, simpler, activities offered from within a ring-
fenced bank, (RFB), will be focused on lower risk, day-to-day core transactions, whilst more complex and
“riskier” activities are required to be housed in a separate entity, a non-ring-fenced bank, (NRFB). This is
intended to ensure that an entity’s core activities are not adversely affected by the acts or omissions of
other members of its group. 
While the structure of the banks included within this process may have changed, the fundamentals of
credit assessment have not. The Council will continue to assess the new-formed entities in the same way
that it does others and those with sufficiently high ratings, (and any other metrics considered) will be
considered for investment purposes.
4.3 Country and sector limits
The Council has determined that it will only use approved counterparties from the UK and from countries with
a minimum sovereign credit rating of AA- from Fitch. The list of countries that qualify using this credit criteria as
at the date of this report are shown in Appendix 8.  This list will be added to, or deducted from, by officers should
ratings change in accordance with this policy.
4.4 Investment strategy
In-house funds:  Investments will be made with reference to the core balance and cash flow requirements and
the outlook for short-term interest rates (i.e. rates for investments up to 24 months). Greater returns are usually
obtainable by investing for longer periods. While cash balances are required in order to manage the ups and
downs of cash flow, where cash sums can be identified that could be invested for longer periods, the value to
be obtained from longer term investments will be carefully assessed. 
 If it is thought that Bank Rate is likely to rise significantly within the time horizon being considered,
then consideration will be given to keeping most investments as being short term or variable. 
 Conversely, if it is thought that Bank Rate is likely to fall within that time period, consideration will be
given to locking in higher rates currently obtainable, for longer periods.
Page 138

Page 139

22 
Investment returns expectations 
The current forecast shown in Appendix 3, includes a forecast for Bank Rate to reach 4.5% in Q2 2023. 
The suggested budgeted investment earnings rates for returns on investments placed for periods up to about
three months during each financial year are as follows.: 
Average earnings in each year 
2022/23 (remainder) 3.95%
2023/24 4.40%
2024/25 3.30%
2025/26              2.60%
2026/27 2.50%
Years 6 to 10 2.80%
Years 10+ 2.80% 
As there are so many variables at this time, caution must be exercised in respect of all interest rate
forecasts. 
Inter-local authority lending and borrowing rates have also declined due to the surge in the levels of cash
seeking a short-term home at a time when many local authorities are probably having difficulties over
accurately forecasting when disbursements of funds received will occur or when further large receipts will
be received from the Government.
Investment treasury indicator and limit
These limits are set with regard to the Council’s liquidity requirements and to reduce the need for early sale of
an investment, and are based on the availability of funds after each year-end.
The Council is asked to approve the treasury indicator and limit: 
2023/24 2024/25 2025/26
20 20 20
5 5 0Current investments as at 31-12-22 in excess of 1 year
maturing each year
Principal sums invested for longer than 365 days
£m
Maximum principal sums invested for longer than 365 days
For its cash flow generated balances, the Council will seek to utilise its business reserve instant access and
notice accounts, money market funds and short-dated deposits (overnight to 100 days). 
Page 139

Page 140

23 
4.5 Investment risk benchmarking
This Council will use an investment benchmark to assess the investment performance of its investment portfolio
of SONIA (Sterling Overnight Interest Average).This benchmark will be used from 1st April 2022 and replaces 7
day LIBID.
4.6 End of year Investment Report
At the end of the financial year, the Council will report on its investment activity as part of its Annual Treasury
Report.
4.7 Policy on environmental, social and governance (E.S.G.)
The Council’s policy on environmental, social and governance (E.S.G) can be found in appendix 11. 
Page 140

Page 141

24 
5 APPENDICES
Appendix 1 – Capital Prudential and Treasury Indicators 2023/24 – 2025/26
1. Affordability Prudential Indicators
The previous sections cover the overall capital and control of borrowing prudential indicators, but within
this framework prudential indicators are required to assess the affordability of the capital investment plans.  
These provide an indication of the impact of the capital investment plans on the Council’s overall finances. 
The Council is asked to approve the following indicators:
Ratio of financing costs to net revenue stream
This indicator identifies the trend in the cost of capital (borrowing and other long term obligation costs net
of investment income) against the net revenue stream. 
2021/22 2022/23 2023/24 2024/25 2025/26
% Actual Estimate Estimate Estimate Estimate
Ratio 5.24% 4.91% 4.37% 4.40% 4.43% 
The estimates of financing costs include current commitments and the proposals in this budget report.
2. Maturity structure of borrowing 
The purpose of this indicator is to restrain the activity of the treasury function within certain
limits, thereby managing risk and reducing the impact of any adverse movement in interest
rates.  However, if this is set to be too restrictive it will impair the opportunities to reduce costs/
improve performance.  The indicator is “Maturity structure of borrowing”. These gross limits
are set to reduce the Council’s exposure to large fixed rate sums falling due for refinancing
and are required for upper and lower limits.  The Council is asked to approve the following
treasury indicator and limits
Lower Upper
0% 30%
0% 30%
0% 30%
0% 40%
10 years to 20 years 0% 100%
20 years to 30 years 0% 100%
30 years to 40 years 0% 100%
40 years to 50 years 0% 100%
0% 100%
Maturity structure of fixed interest rate borrowing 2023/24
12 months to 2 years
2 years to 5 years
Under 12 months
5 years to 10 years
50 years and above .
The interest rate exposure in respect of the Council’s external debt will be monitored on an ongoing basis
by keeping the proportion of variable interest rate debt at an appropriate level given the total amount of
external debt and the interest rate environment within which the Council is operating. When interest rates
Page 141

Page 142

25 
are increasing the Council will look to move to fixed rate borrowing and if interest rates are likely to fall
then the level of variable rate borrowing will be increased to minimise future interest payments. 
2022/23 2023/24 2024/25 2025/26
Upper Upper Upper Upper
195% 190% 190% 190%
60% 60% 60% 60%
%
Interest rate exposure
Limits on fixed interest rates based on net debt
Limits on variable interest rates based on net
debt 
Page 142

Page 143

26 
Appendix 2 – Detailed Current Portfolio Position
Actual Actual Current Current
31.3.22 31.3.22 31.12.22 31.12.22
Treasury investments £000 %  £000 % 
Banks Clydesdale Bank 5,117 5% 6,921 7%
Bank of Scotland 0 0% 0 0%
Goldman Sachs 10,000 9% 0 0%
Qatar National Bank 5,000 5% 0 0%
Commonwealth Bank of Australia 0 0% 0 0%
Santander 5,000 5% 0 0%
ANZ Banking Group/London 0 0% 10,000 10%
Close Brothers 15,000 14% 2,500 2%
First Abu Dhabi Bank 10,000 9% 15,000 15%
AL Rayan Bank 10,000 9% 5,000 5%
Toronto Dominion Bank 5,000 5% 5,000 5%
National Bank of Kuwait 5,000 5% 7,500 7%
70,117 63% 51,921 50%
Local Authorities London Borough of Croydon 7,500 7% 5,000 5%
Rotherhan Metropolitan Borough Council 7,500 7% 0 0%
Thurrock Borough Council 0 0% 10,000 10%
Cheshire West & Chester Council 2,500 2% 2,500 2%
Cambridgeshire County Council 0 0% 5,000 5%
Spelthorn Borough Council 0 0% 5,000 5%
Slough Borough Council 0 0% 10,000 10%
Barnsley Metropolitian Borough Council 0 0% 5,000 5%
17,500 16% 42,500 41%
DMADF (H.M.Treasury) 0 0% 0 0%
Money Market Funds BNP Paribas Inticast Fund 10,000 9% 4,700 5%
Federated 0 0% 0 0%
CCLA 9,600 9% 0 0%
AVIVA 0 0% 0 0%
19,600 18% 4,700 5%
Third Party Loans Argyll Community Housing Association 2,410 2% 2,344 2%
Fyne Homes 0 0% 0 0%
West Highland Housing Accociation Ltd 837 1% 814 1%
The Port Ellen Station 50 0% 44 0%
Hubco Sub Debt 492 0% 492 0%
3,789 3% 3,694 4%
Total Treasury Investments 111,006 100% 102,815 100%
TREASURY PORTFOLIO
Page 143

Page 144

27 
Actual Actual Current Current
31.3.22 31.3.22 31.12.22 31.12.22
Treasury external borrowing
Local Authorities 0 0% 0 0%
PWLB 118,145 66% 84,273 58%
LOBOs Commerzbank Finance & Covered Bonds S.A. 13,000 7% 13,000 9%
FMS Wertmanagement 5,255 3% 5,255 4%
Bayerische Landesbank 21,000 12% 21,000 15%
39,255 22% 39,255 27%
Market Barclays (formerly LOBO) 10,000 6% 10,000 7%
10,000 6% 10,000 7%
Special Prudential assurance co 10 0% 8 0%
10 0% 8 0%
Temporary Borrowing 10,500 6% 10,540 7%
Local Bonds 24 0% 18 0%
Total External Borrowing 177,934 100% 144,094 100%
Net Treasury Investments / (Borrowing) (66,928) (41,279) 
Page 144

Page 145

28 
Appendix 3 – Interest Rate Forecasts 2023 - 2025 and Commentary Provided by Link Treasury Services (08.12.22) 
PWLB forecasts are based on PWLB certainty rates.
Link Group Interest Rate View 08.11.22
Dec-22 Mar-23 Jun-23 Sep-23 Dec-23 Mar-24 Jun-24 Sep-24 Dec-24 Mar-25 Jun-25 Sep-25 Dec-25
BANK RATE 3.50 4.25 4.50 4.50 4.50 4.00 3.75 3.50 3.25 3.00 2.75 2.50 2.50
3 month ave earnings 3.60 4.30 4.50 4.50 4.50 4.00 3.80 3.30 3.00 3.00 2.80 2.50 2.50
6 month ave earnings 4.20 4.50 4.60 4.50 4.20 4.10 3.90 3.40 3.10 3.00 2.90 2.60 2.60
12 month ave earnings 4.70 4.70 4.70 4.50 4.30 4.20 4.00 3.50 3.20 3.10 3.00 2.70 2.70
5 yr   PWLB 4.30 4.30 4.20 4.10 4.00 3.90 3.80 3.60 3.50 3.40 3.30 3.20 3.10
10 yr PWLB 4.50 4.50 4.40 4.30 4.20 4.00 3.90 3.70 3.60 3.50 3.40 3.30 3.20
25 yr PWLB 4.70 4.70 4.60 4.50 4.40 4.30 4.10 4.00 3.90 3.70 3.60 3.50 3.50
50 yr PWLB 4.30 4.40 4.30 4.20 4.10 4.00 3.80 3.70 3.60 3.40 3.30 3.20 3.20
Page 145

Page 146

29 
Appendix 4 – Economic Background Provided by Link Treasury Services (at 08.12.22)
Against a backdrop of stubborn inflationary pressures, the easing of Covid restrictions in
most developed economies, the Russian invasion of Ukraine, and a range of different UK
Government policies, it is no surprise that UK interest rates have been volatile right across
the curve, from Bank Rate through to 50-year gilt yields, for all of 2022.
Market commentators’ misplaced optimism around inflation has been the root cause of the
rout in the bond markets with, for example, UK, EZ and US 10-year yields all rising by over
200bps since the turn of the year.  The table below provides a snapshot of the conundrum
facing central banks: inflation is elevated but labour markets are extra-ordinarily tight, making
it an issue of fine judgment as to how far monetary policy needs to tighten.   
UK Eurozone US
Bank Rate 3.0% 1.5% 3.75%-4.00%
GDP -0.2%q/q Q3
(2.4%y/y)
+0.2%q/q Q3 (2.1%y/y) 2.6% Q3 Annualised
Inflation 11.1%y/y (Oct) 10.0%y/y (Nov) 7.7%y/y (Oct)
Unemployment Rate 3.6% (Sep) 6.6% (Sep) 3.7% (Aug) 
Q2 of 2022 saw UK GDP revised upwards to +0.2% q/q, but this was quickly reversed
in the third quarter, albeit some of the fall in GDP can be placed at the foot of the extra
Bank Holiday in the wake of the Queen’s passing.  Nevertheless, CPI inflation has
picked up to what should be a peak reading of 11.1% in October, although with further
increases in the gas and electricity price caps pencilled in for April 2023, and the cap
potentially rising from an average of £2,500 to £3,000 per household, there is still a
possibility that inflation will spike higher again before dropping back slowly through
2023.  
The UK unemployment rate fell to a 48-year low of 3.6%, and this despite a net
migration increase of c500k.  The fact is that with many economic participants
registered as long-term sick, the UK labour force actually shrunk by c£500k in the year
to June.  Without an increase in the labour force participation rate, it is hard to see how
the UK economy will be able to grow its way to prosperity, and with average wage
increases running at 5.5% - 6% the MPC will be concerned that wage inflation will
prove just as sticky as major supply-side shocks to food and energy that have endured
since Russia’s invasion of Ukraine on 22nd February 2022.
Throughout Q3 Bank Rate increased, finishing the quarter at 2.25% (an increase of
1%).  Q4 has seen rates rise to 3% in November and the market expects Bank Rate
to hit 4.5% by May 2023.
Following a Conservative Party leadership contest, Liz Truss became Prime Minister
for a tumultuous seven weeks that ran through September and December.   Put simply,
the markets did not like the unfunded tax-cutting and heavy spending policies put
forward by her Chancellor, Kwasi Kwarteng, and their reign lasted barely seven weeks
before being replaced by Prime Minister Rishi Sunak and Chancellor Jeremy Hunt. 
Their Autumn Statement of 17th November gave rise to a net £55bn fiscal tightening,
although much of the “heavy lifting” has been left for the next Parliament to deliver. 
However, the markets liked what they heard, and UK gilt yields have completely
reversed the increases seen under the previous tenants of No10/11 Downing Street.
Page 146

Page 147

30 
Globally, though, all the major economies are expected to struggle in the near term. 
The fall below 50 in the composite Purchasing Manager Indices for the UK, US, EZ
and China all point to at least one if not more quarters of GDP contraction.  In
November, the MPC projected eight quarters of negative growth for the UK lasting
throughout 2023 and 2024, but with Bank Rate set to peak at lower levels than
previously priced in by the markets and the fiscal tightening deferred to some extent,
it is not clear that things will be as bad as first anticipated by the Bank. 
The £ has strengthened of late, recovering from a record low of $1.035, on the Monday
following the Truss government’s “fiscal event”, to $1.20. Notwithstanding the £’s better
run of late, 2023 is likely to see a housing correction of some magnitude as fixed-rate
mortgages have moved above 5% and affordability has been squeezed despite
proposed Stamp Duty cuts remaining in place.
In the table below, the rise in gilt yields, and therein PWLB rates, through the first half
of 2022/23 is clear to see. 
However, the peak in rates on 28th September as illustrated in the table covering April
to September 2022 below, has been followed by the whole curve shifting ever lower.  
PWLB rates at the front end of the curve are generally over 1% lower now whilst the
50 years is over 1.75% lower. 
After a shaky start to the year, the S&P 500 and FTSE 100 have climbed in recent
weeks, albeit the former is still 17% down and the FTSE 2% up.  The German DAX is
9% down for the year. 
CENTRAL BANK CONCERNS – NOVEMBER 2022
Page 147

Page 148

31 
At the start of November, the Fed decided to push up US rates by 0.75% to a range of
3.75% - 4%, whilst the MPC followed a day later by raising Bank Rate from 2.25% to
3%, in line with market expectations.  EZ rates have also increased to 1.5% with further
tightening in the pipeline. 
Having said that, the press conferences in the US and the UK were very different.  In
the US, Fed Chair, Jerome Powell, stated that rates will be elevated and stay higher
for longer than markets had expected.  Governor Bailey, here in the UK, said the
opposite and explained that the two economies are positioned very differently so you
should not, therefore, expect the same policy or messaging. 
Regarding UK market expectations, although they now expect Bank Rate to peak
within a lower range of 4.5% - 4.75%, caution is advised as the Bank of England
Quarterly Monetary Policy Reports have carried a dovish message over the course of
the last year, only for the Bank to have to play catch-up as the inflationary data has
proven stronger than expected.   
In addition, the Bank’s central message that GDP will fall for eight quarters starting
with Q3 2022 may prove to be a little pessimistic.  Will the £160bn excess savings
accumulated by households through the Covid lockdowns provide a spending buffer
for the economy – at least to a degree?  Ultimately, however, it will not only be inflation
data but also employment data that will mostly impact the decision-making process,
although any softening in the interest rate outlook in the US may also have an effect
(just as, conversely, greater tightening may also). 
Page 148

Page 149

32 
Appendix 5 - Treasury Management Practice (TMP1) Permitted Investments
This Council approves the following forms of investment instrument for use as permitted
investments as set out in table 1. 
Treasury risks
All the investment instruments in table 1 are subject to the following risks: - 
 Credit and counter-party risk: this is the risk of failure by a counterparty (bank or
building society) to meet its contractual obligations to the organisation particularly as a
result of the counterparty’s diminished creditworthiness, and the resulting detrimental
effect on the organisation’s capital or current (revenue) resources. There are no
counterparties where this risk is zero although AAA rated organisations have the
highest, relative, level of creditworthiness. 
 Liquidity risk: this is the risk that cash will not be available when needed.   Whilst it
could be said that all counterparties are subject to at least a very small level of liquidity
risk as credit risk can never be zero, in this document, liquidity risk has been treated as
whether or not instant access to cash can be obtained from each form of investment
instrument.  However, it has to be pointed out that while some forms of investment e.g.
gilts, CDs, corporate bonds can usually be sold immediately if the need arises, there
are two caveats: - 
a. Cash may not be available until a settlement date up to three days after the
sale  
b. There is an implied assumption that markets will not freeze up and so the
instrument in question will find a ready buyer.  
The column in table 1 headed as ‘market risk’ will show each investment instrument
as being instant access, sale T+3 = transaction date plus 3 business days before you
get cash, or term i.e. money is locked in until an agreed maturity date. 
 Market risk: this is the risk that, through adverse market fluctuations in the value of the
principal sums an organisation borrows and invests, its stated treasury management
policies and objectives are compromised, against which effects it has failed to protect
itself adequately.  However, some cash rich local authorities may positively want
exposure to market risk e.g. those investing in investment instruments with a view to
obtaining a long-term increase in value. 
 Interest rate risk: this is the risk that fluctuations in the levels of interest rates create
an unexpected or unbudgeted burden on the organisation’s finances, against which the
organisation has failed to protect itself adequately.  This authority has set limits for its
fixed and variable rate exposure in its Treasury Indicators in this report.  All types of
investment instrument have interest rate risk except for the following forms of
instrument which are at variable rate of interest (and the linkage for variations is also
shown). 
 Legal and regulatory risk: this is the risk that the organisation itself, or an organisation
with which it is dealing in its treasury management activities, fails to act in accordance
with its legal powers or regulatory requirements, and that the organisation suffers losses
accordingly.    
Page 149

Page 150

33 
Controls on treasury risks
 Credit and counter-party risk: this authority has set minimum credit criteria to determine which
counterparties and countries are of sufficiently high creditworthiness to be considered for
investment purposes.  See paragraphs 4.2 and 4.3. 
 Liquidity risk: this authority has a cash flow forecasting model to enable it to determine how
long investments can be made for and how much can be invested. 
 Market risk: this authority purchases Certificates of Deposit (CD’s), as they offer a higher rate
of return than depositing in the DMADF. They are usually held until maturity but in exceptional
circumstances, they can be quickly sold at the current market value, (which may vary from the
purchase cost), if the need arises for extra cash at short notice. Their value does not usually
vary much during their short life. 
 Interest rate risk: this authority manages this risk by having a view of the future course of
interest rates and then formulating a treasury management strategy accordingly which aims to
maximise investment earnings consistent with control of risk or alternatively, seeks to minimise
expenditure on interest costs on borrowing.  See paragraph 4.4. 
Legal and regulatory risk: this authority will not undertake any form of investing until it has ensured that
it has all necessary powers and complied with all regulations.  
Unlimited investments
Regulation 24 states that an investment can be shown in table 1 as being ‘unlimited’ in terms of the
maximum amount or percentage of the total portfolio that can be put into that type of investment.  However,
it also requires that an explanation must be given for using that category.  
The authority has given the following types of investment an unlimited category: - 
 Debt Management Agency Deposit Facility.  This is considered to be the lowest risk form of
investment available to local authorities as it is operated by the Debt Management Office which
is part of H.M. Treasury i.e. the UK Government’s sovereign rating stands behind the DMADF. 
It is also a deposit account and avoids the complications of buying and holding Government
issued treasury bills or gilts. 
 High credit worthiness banks and building societies.  See paragraph 4.2 for an explanation
of this authority’s definition of high credit worthiness.  While an unlimited amount of the
investment portfolio may be put into banks and building societies with high credit worthiness,
the authority will ensure diversification of its portfolio ensuring that no more than £20m of the
total portfolio can be placed with UK banks and £15m in any single non UK bank institution or
group at any one time.
Page 150

Page 151

34 
Objectives of each type of investment instrument
Regulation 25 requires an explanation of the objectives of every type of investment instrument
which an authority approves as being ‘permitted’. 
Deposits
The following forms of ‘investments’ are actually more accurately called deposits as cash is
deposited in an account until an agreed maturity date or is held at call. 
 Debt Management Agency Deposit Facility.  This offers the lowest risk form of
investment available to local authorities as it is effectively an investment placed with the
Government.  It is also easy to use as it is a deposit account and avoids the
complications of buying and holding Government issued treasury bills or gilts.  As it is
low risk it also earns low rates of interest.  However, it is very useful for authorities
whose overriding priority is the avoidance of risk.  The longest period for a term deposit
with the DMADF is 6 months. 
 Term deposits with high credit worthiness banks and building societies.  See
paragraph 4.2 for an explanation of this authority’s definition of high credit worthiness. 
This is the most widely used form of investing used by local authorities.  It offers a much
higher rate of return than the DMADF (dependent on term). The authority will ensure
diversification of its portfolio of deposits ensuring that no more than £20m of the total
portfolio can be placed with any UK bank and £15m with any single non UK bank
institution or group.  In addition, longer-term deposits offer an opportunity to increase
investment returns by locking in high rates ahead of an expected fall in the level of
interest rates.  At other times, longer-term rates can offer good value when the markets
incorrectly assess the speed and timing of interest rate increases.  This form of investing
therefore, offers a lot of flexibility and higher earnings than the DMADF.  Where it is
restricted is that once a longer-term investment is made, that cash is locked in until the
maturity date. 
 Call accounts with high credit worthiness banks and building societies.  The
objectives are as for term deposits above but there is instant access to recalling cash
deposited.  This generally means accepting a lower rate of interest than that which
could be earned from the same institution by making a term deposit.  Some use of call
accounts is highly desirable to ensure that the authority has ready access to cash when
needed to pay bills. 
 Fixed term deposits with variable rate and variable maturities (structured
deposits).  This line encompasses ALL types of structured deposits.  There has been
considerable change in the types of structured deposits brought to the market over the
last few years, some of which are already no longer available.  In view of the fluidity of
this area, this is a generic title for all structured deposits so as to provide councils with
greater flexibility to adopt new instruments as and when they are brought to the market. 
However, this does mean that members ought to be informed as to what instruments
are presently under this generic title so that they are aware of the current situation, and
that they are informed and approve of intended changes in an appropriate manner.   
 Collateralised deposits.  These are deposits placed with a bank which offers collateral
backing based on specific assets. Examples seen in the past have included local
authority LOBOs, where such deposits are effectively lending to a local authority as that
is the ultimate security.  
Page 151

Page 152

35 
DEPOSITS WITH COUNTERPARTIES CURRENTLY IN RECEIPT OF GOVERNMENT
SUPPORT / OWNERSHIP
These banks offer another dimension of creditworthiness in terms of Government backing through
either partial or full direct  ownership.  The view of this authority is that such backing makes these
banks attractive institutions with whom to place deposits, and that will remain our view if the UK
sovereign rating were to be downgraded in the coming year. 
 Term deposits with high credit worthiness banks which are fully or semi
nationalised. As for term deposits in the previous section, but Government full, (or
substantial partial), ownership, implies that the Government stands behind this bank
and will be deeply committed to providing whatever support that may be required to
ensure the continuity of that bank.  This authority considers that this indicates a low and
acceptable level of residual risk.
 Fixed term deposits with variable rate and variable maturities (structured
deposits).  This line encompasses ALL types of structured deposits.  There has been
considerable change in the types of structured deposits brought to the market over the
last few years, some of which are already no longer available.  In view of the fluidity of
this area, this is a generic title for all structured deposits so as to provide councils with
greater flexibility to adopt new instruments as and when they are brought to the market. 
However, this does mean that members ought to be informed as to what instruments
are presently covered under this generic title so that they are aware of the current
situation, and that they are informed and approve of intended changes in an appropriate
manner. 
COLLECTIVE INVESTMENT SCHEMES STRUCTURED AS OPEN ENDED INVESTMENT
COMPANIES (OEICS)
 Government liquidity funds.  These are the same as money market funds (see
below) but only invest in government debt issuance with highly rated governments.  Due
to the higher quality of underlying investments, they offer a lower rate of return than
MMFs. However, their net return is typically on a par with the DMADF, but with instant
access. 
Money Market Funds (MMFs).  ). MMFs are regulated under The European Money
Market Fund Regulation (EU) 2017/1131. The Regulation was implemented in full on 21
March 2019. They typically carry a AAA money fund rating and can be priced using the
following methods. Constant Net Asset Value (CNAV), Low Volatility Net Asset Value
(LVNAV) and Variable Net Asset Value (VNAV). The majority of MMFs are priced using the
LVNAV pricing method, which allows for constant pricing in normal market conditions. They
are highly diversified, using many forms of money market securities including types which
this authority does not currently have the expertise or capabilities to hold directly. However,
due to the high level of expertise of the fund managers and the huge amounts of money
invested in MMFs, and the fact that the weighted average maturity (WAM) cannot exceed
60 days, MMFs offer a combination of high security, instant access to funds, high
diversification and competitive rates of return compared to equivalent instant access
facilities. They are particularly advantageous in falling interest rate environments as they
are actively managed giving the opportunity to lock in investments earning higher rates of
interest than might be available in the market. MMFs also help an authority to diversify its
own portfolio as e.g., a £2m investment placed directly with HSBC is a 100% 
 risk exposure to HSBC whereas £2m invested in a MMF may end up with say £10,000
being invested with HSBC through the MMF. For authorities particularly concerned with
Page 152

Page 153

36 
risk exposure to banks, MMFs offer an effective way of minimising risk exposure while
still delivering superior rates of return available through the DMADF. 
Ultra short dated bond funds.  Ultra short dated bond funds. These funds are similar to
MMFs and can carry a AAA bond fund rating. Due to the longer dated nature of the assets
they invest in the funds use a VNAV pricing method meaning the price will move up and
down inline with market movements. They aim to achieve a higher yield and to do this either
take longer term credit risk by using floating rate notes or by investing in longer durations,
which means their assets are more volatile. Typically, these funds can have weighted
average maturities of up to 360 days and weighted average life’s beyond 5 years. Their
primary objective is to firstly generate a competitive total return, whilst preserving capital.
They therefore carry a higher level of risk than MMFs and correspondingly have the
potential to earn higher returns than MMFs. 
 Gilt funds.  These are funds which invest only in U.K. Government gilts.  They offer a
lower rate of return than bond funds but are highly rated both as a fund and through
investing only in highly rated government securities.  They offer a higher rate of return
than investing in the DMADF but they do have an exposure to movements in market
prices of assets held. 
 Bond funds.  These can invest in both government and corporate bonds.  This
therefore entails a higher level of risk exposure than gilt funds and the aim is to achieve
a higher rate of return than normally available from gilt funds by trading in non-
government bonds.  
SECURITIES ISSUED OR GUARANTEED BY GOVERNMENTS 
The following types of investments are where an authority directly purchases a particular
investment instrument, a security, i.e. it has a market price when purchased and that value can
change during the period the instrument is held until it matures or is sold.  The annual earnings
on a security is called a yield i.e. it is normally the interest paid by the issuer divided by the price
you paid to purchase the security unless a security is initially issued at a discount e.g. treasury
bills. 
 Treasury bills.  These are short-term bills, (up to 18 months but usually 9 months or
less), issued by the Government and so are backed by the sovereign rating of the UK. 
The yield is higher than the rate of interest paid by the DMADF and another advantage
compared to a time deposit in the DMADF is that they can be sold if there is a need for
access to cash at any point in time.  However, there is a spread between purchase and
sale prices so early sales could incur a net cost during the period of ownership. 
 Gilts.  These are longer-term debt issuance by the UK Government and are backed by
the sovereign rating of the UK. The yield is higher than the rate of interest paid by the
DMADF and another advantage compared to a time deposit in the DMADF is that they
can be sold if there is a need for access to cash at any point in time.  However, there is
a spread between purchase and sale prices so early sales may incur a net cost. Market
movements that occur between purchase and sale may also have an adverse impact
on proceeds. The advantage over Treasury bills is that they generally offer higher yields
the longer it is to maturity (for most periods) if the yield curve is positive. 
 Bond issuance issued by a financial institution which is explicitly guaranteed by
the UK Government e.g. National Rail.  This is similar to a gilt due to the explicit
Government guarantee. 
Page 153

Page 154

37 
 Sovereign bond issues (other than the UK govt) denominated in Sterling.  As for
gilts but issued by other nations.  Use limited to issues of nations with at least the same
sovereign rating as for the UK. 
 Bonds issued by Multi Lateral Development Banks (MLDBs).  These are similar to
c. and e. above but are issued by MLDBs which are typically guaranteed by a group of
sovereign states e.g. European Bank for Reconstruction and Development.
SECURITIES ISSUED BY CORPORATE ORGANISATIONS 
The following types of investments are where an authority directly purchases a particular
investment instrument, a security, i.e. it has a market price when purchased and that value can
change during the period the instrument is held until it is sold.  The annual earnings on a security
is called a yield i.e. is the interest paid by the issuer divided by the price you paid to purchase the
security.  These are similar to the previous category but corporate organisations can have a wide
variety of credit worthiness so it is essential for local authorities to only select the organisations
with the highest levels of credit worthiness.  Corporate securities are generally a higher risk than
government debt issuance and so earn higher yields. 
a. Certificates of deposit (CDs).  These are shorter-term securities issued by deposit
taking institutions (mainly financial institutions). They are negotiable instruments, so can
be sold ahead of maturity and also purchased after they have been issued.  However,
that liquidity can come at a price, where the yield could be marginally less than placing
a deposit with the same bank as the issuing bank. 
b. Commercial paper.  This is similar to CDs but is issued by commercial
organisations or other entities.  Maturity periods are up to 365 days but commonly
90 days.   
c. Corporate bonds.  These are (long term) bonds (usually bearing a fixed rate of
interest) issued by a financial institution, company or other non-government issuer
in order to raise capital for the institution as an alternative to issuing shares or
borrowing from banks.  They are generally seen to be of a lower creditworthiness
than government issued debt and so usually offer higher rates of yield. 
d. Floating rate notes.  These are bonds on which the rate of interest is established
periodically with reference to short-term interest rates.  
OTHER
Property fund.  This is a collective investment fund specialising in property.  Rather than
owning a single property with all the risk exposure that means to one property in one location
rising or falling in value, maintenance costs, tenants actually paying their rent / lease etc, a
collective fund offers the advantage of diversified investment over a wide portfolio of different
properties.  This can be attractive for authorities who want exposure to the potential for the
property sector to rise in value.  However, timing is critical to entering or leaving this sector
at the optimum times of the property cycle of rising and falling values. Typically, the minimum
investment time horizon for considering such funds is at least 3-5 years.  
Page 154

Page 155

38 
Table 1: permitted investments in house 
This table is for use by the in house treasury management team.  
1.1  Deposits 
* Minimum Credit
Criteria / colour
banding 
Liquidity
risk
Market
risk
Max %  
of total
investments
Max. maturity
period
Debt Management Agency Deposit
Facility --  term no 100 6 months
Term deposits – local authorities   --  term  no 100 2 years
Call accounts – banks and building
societies 
Yellow
Purple
Blue
Orange
Red
Green
No Colour 
instant  no
100
Up to 5 yrs
Up to 2 yrs
Up to 1 yr
Up to 1 yr
Up to 6 mths
Up to 100 days
Not for use
Term deposits – banks and building
societies 
Yellow
Purple
Blue
Orange
Red
Green
No Colour 
term  no
100 
Up to 5 yrs
Up to 2 yrs
Up to 1 yr
Up to 1 yr
Up to 6 mths
Up to 100 days
Not for use
Fixed term deposits with variable
rate and variable maturities: -
Structured deposits. 
Green term no 50 2 years
Collateralised deposit  (see note 1) UK sovereign
rating  term  no 50 1 year 
Note 1. As collateralised deposits are backed by e.g. AAA rated local authority LOBOs, this
investment instrument is effectively a AAA rated investment 
1.2 Deposits with counterparties currently in receipt of government support / ownership 
* Minimum Credit
Criteria / colour
banding 
Liquidity
risk
Market
risk
Max %  of
total
investments
Max.
maturity
period
UK  part nationalised banks Blue  term  no 100 1 Year
Banks part nationalised by high
credit rated (sovereign rating)
countries – non UK
UK Sovereign Rating
or Blue  term  no 100 1 Year
Fixed term deposits with variable
rate and variable maturities: -
Structured deposits  
Green term yes 100 1 Year 
Page 155

Page 156

39 
1.3 Collective investment schemes structured as Open Ended Investment Companies
(OEICs) 
* Minimum Fund
Rating  Liquidity
risk
Market
risk
Max %  of
total
investments
Max.
maturity
period    
1a. Money Market Funds CNAV AAA  instant 
No
see note 1  100 1 Year    
1b. Money Market Funds LVNAV AAA  Instant  to
T+5 
No
see note 1  100 1 Year    
1c. Money Market Funds VNAV AAA  instant to
T+5 
No
see note 1  100 1 Year    
2. Ultra short dated bond funds
with a credit score of 1.25   AAA  T+1 to T+5  yes 100 1 Year     
3. Ultra short dated bond funds
with a credit score of 1.5   AAA  T+1 to T+5  yes 100 1 Year    
4. Bond Funds    AAA  T+2 or
longer 
yes 100 1 Year    
5. Gilt Funds UK sovereign rating
T+2 or
longer  yes 100 1 Year 
Note 1. The objective of MMFs is to maintain the net asset value but they hold assets which
can vary in value.  However, the credit rating agencies require the fluctuation in unit values
held by investors to vary by almost zero. 
1.4 Securities issued or guaranteed by governments 
* Minimum Credit
Criteria  Liquidity
risk
Market
risk 
Max % 
of total
investments
Max.
maturity
period
Treasury Bills UK sovereign rating  Sale T+1  yes 100 1 Year
UK Government Gilts UK sovereign rating   Sale T+1  yes 100 1 Year
Bond issuance issued by a financial
institution which is explicitly
guaranteed by  the UK Government 
e.g. National Rail
UK sovereign rating  Sale T+3  yes 100 1 Year
Sovereign bond issues (other than
the UK govt) AAA  Sale T+1  yes 80 1 Year
Bonds issued by multilateral
development banks  AAA  Sale T+1  yes 80 1 Year 
Page 156

Page 157

40 
1.5 Securities issued by corporate organisations 
* Minimum Credit
Criteria  Liquidity
risk
Market
risk 
Max % 
of total
investments
Max.
maturity
period
Certificates of deposit issued by
banks and building societies  Green  Sale T+0  yes 50 2 Years
Commercial paper other  Green  Sale T+0  yes 20 2 Years
Floating rate notes Green  Sale T+0  yes 20 2 Years
Corporate Bonds other  Green  Sale T+3  yes 20 2 Years 
Accounting treatment of investments.  The accounting treatment may differ from the
underlying cash transactions arising from investment decisions made by this Council. To ensure
that the Council is protected from any adverse revenue impact, which may arise from these
differences, we will review the accounting implications of new transactions before they are
undertaken. 
1.6 Other 
* Minimum Credit
Criteria / fund rating  Liquidity
risk
Market
risk 
Max % 
of total
investments
Max.
maturity
period 
Property funds  --  T+4  yes 100 5 Years 
Page 157

Page 158

41 
Appendix 6 – Treasury Management Practice (TMP2) Credit and Counterparty Risk Management 
The following table is for use by the Treasury team and is a list of current counterparties. However, the use of counterparties depends on credit
ratings and the Council may stop using certain counterparties and may stop using certain counterparties and/or decide to use alternative
counterparties within its permitted investments.  If for unavoidable short term operation reasons, limits are breached this will be communicated
to management immediately.  
The Monitoring of Investment Counterparties - The status of counterparties will be monitored regularly.  The Council receives credit rating and market
information from Link Treasury Services, including when ratings change, and counterparties are checked promptly.  On occasion ratings may be
downgraded when an investment has already been made.  The criteria used are such that a minor downgrading should not affect the full receipt of the
principal and interest.  Any counterparty failing to meet the criteria will be removed from the list immediately by the Section 95 Officer, and if required new
counterparties which meet the criteria will be added to the list. 
Type of Investment Treasury Risks Mitigating Controls Council
Limits
Common
Good
Limits
Cash type instruments
a. Deposits with the Debt
Management Account
Facility (UK Government)
(Very low risk)
This is a deposit with the UK
Government and as such counterparty
and liquidity risk is very low, and there
is no risk to value.  Deposits can be
between overnight and 6 months.
Little mitigating controls required.  As this
is a UK Government investment the
monetary limit is unlimited to allow for a
safe haven for investments.
£unlimited,
maximum 6
months.
£unlimited,
maximum 6
months.
b. Deposits with other local
authorities or public
bodies (Very low risk)
These are considered quasi UK
Government debt and as such
counterparty risk is very low, and there
is no risk to value.  Liquidity may
present a problem as deposits can
only be broken with the agreement of
the counterparty, and penalties can
apply.
Little mitigating controls required for local
authority deposits, as this is a quasi UK
Government investment.
Non- local authority deposits will follow
the approved credit rating criteria.
£unlimited,
maximum 2
year.
Limit of
£10m per
local
Authority or
public body
£unlimited,
maximum 2
years.
Page 158

Page 159

42 
Type of Investment Treasury Risks Mitigating Controls Council
Limits
Common
Good
Limits
Deposits with other non-local authority
bodies will be restricted to the overall
credit rating criteria.
c. Money Market Funds
(MMFs) –
CNAV/LVNAV/VNAV(Low
to very low risk) 
Pooled cash investment vehicle which
provides very low counterparty,
liquidity and market risk.  These will
primarily be used as liquidity
instruments.
Funds will only be used where the MMFs
has a “AAA” rated status from either Fitch,
Moody’s or Standard and Poor’s.
£15m per
fund 
100% 
d. Ultra short dated bond
funds (low risk)
Pooled cash investment vehicle which
provides very low counterparty,
liquidity and market risk.  These will
primarily be used as liquidity
instruments.
Funds will only be used where the have a
“AAA” rated status from either Fitch,
Moody’s or Standard and Poor’s.
£15m per
fund
100% 
e. Call account deposit
accounts with financial
institutions (banks and
building societies) (Low
risk depending on
credit rating)
These tend to be low risk investments,
but will exhibit higher risks than
categories (a), (b) and (c) above. 
Whilst there is no risk to value with
these types of investments, liquidity is
high and investments can be returned
at short notice.  
The counterparty selection criteria
approved above restricts lending only to
high quality counterparties, measured
primarily by credit ratings from Fitch,
Moody’s and Standard and Poor’sDay to
day investment dealing with this criteria
will be further strengthened by use of
additional market intelligence.
As shown in
the
counterparty
section
criteria
above.
As shown in
the
counterparty
section
criteria
above.
f. Term deposits with
financial institutions
(banks and building
societies) (Low to
medium risk depending
These tend to be low risk investments,
but will exhibit higher risks than
categories (a), (b) and (c) above. 
Whilst there is no risk to value with
these types of investments, liquidity is
low and term deposits can only be
The counterparty selection criteria approved
above restricts lending only to high quality
counterparties, measured primarily by credit
ratings from Fitch, Moody’s and Standard
and Poor’s.  Day to day investment dealing
with this criteria will be further strengthened
by use of additional market intelligence.
As shown in
the
counterparty
section
criteria
above.
As shown in
the
counterparty
section
criteria
above.
Page 159

Page 160

43 
Type of Investment Treasury Risks Mitigating Controls Council
Limits
Common
Good
Limits
on period & credit
rating) 
broken with the agreement of the
counterparty, and penalties may apply.  
g. Government Gilts and
Treasury Bills (Very low
risk)
These are marketable securities
issued by the UK Government and as
such counterparty and liquidity risk is
very low, although there is potential
risk to value arising from an adverse
movement in interest rates (no loss if
these are held to maturity.  
Little counterparty mitigating controls are
required, as this is a UK Government
investment.   The potential for capital loss
will be reduced by limiting the maximum
monetary and time exposures.
£10m
maximum 1
year.
100%
maximum 1
year.
h. Certificates of deposits
with financial institutions
(Low risk)
These are short dated marketable
securities issued by financial
institutions and as such counterparty
risk is low, but will exhibit higher risks
than categories (a), (b) and (c) above. 
There is risk to value of capital loss
arising from selling ahead of maturity if
combined with an adverse movement
in interest rates (no loss if these are
held to maturity).  Liquidity risk will
normally be low.
The counterparty selection criteria
approved above restricts lending only to
high quality counterparties, measured
primarily by credit ratings from Fitch,
Moody’s and Standard and Poor’s.  Day
to day investment dealing with this criteria
will be further strengthened by the use of
additional market intelligence.
£10m per
counterparty
maximum  
1 year.
20%
maximum 1
year.
i. Structured deposit
facilities with banks and
building societies
(escalating rates, de-
escalating rates etc.)
(Low to medium risk
These tend to be medium to low risk
investments, but will exhibit higher
risks than categories (a), (b) and (c)
above.  Whilst there is no risk to value
with these types of investments,
liquidity is very low and investments
can only be broken with the agreement
The counterparty selection criteria
approved above restricts lending only to
high quality counterparties, measured
primarily by credit ratings from Fitch,
Moody’s and Standard and Poor’s.  Day
to day investment dealing with this criteria
As shown in
the
counterparty
section
criteria
above.
As shown in
the
counterparty
section
criteria
above.
Page 160

Page 161

44 
Type of Investment Treasury Risks Mitigating Controls Council
Limits
Common
Good
Limits
depending on period &
credit rating)
of the counterparty (penalties may
apply).  
will be further strengthened by the use of
additional market intelligence.
j. Corporate bonds
(Medium to high risk
depending on period &
credit rating)
These are marketable securities
issued by financial and corporate
institutions. Counterparty risk will vary
and there is risk to value of capital loss
arising from selling ahead of maturity if
combined with an adverse movement
in interest rates.  Liquidity risk will be
low.  
The counterparty selection criteria
approved above restricts lending only to
high quality counterparties, measured
primarily by credit ratings from Fitch,
Moody’s and Standard and Poor’s.  . 
Corporate bonds will be restricted to
those meeting the base criteria.
Day to day investment dealing with this
criteria will be further strengthened by the
use of additional market intelligence.
£5m and
maximum   
1 year.
£20% and
maximum   
1 year.
Other types of investments
a. Investment properties These are non-service properties
which are being held pending disposal
or for a longer term rental income
stream.  These are highly illiquid
assets with high risk to value (the
potential for property prices to fall or
for rental voids).  
In larger investment portfolios some small
allocation of property based investment
may counterbalance/compliment the
wider cash portfolio.
Property holding will be re-valued
regularly and reported annually with gross
and net rental streams.
£10m 20%.
b. Loans to third parties,
including soft loans
These are service investments either
at market rates of interest or below
market rates (soft loans).  These types
of investments may exhibit credit risk
and are likely to be highly illiquid.
Each third party loan requires Member
approval and each application is
supported by the service rational behind
the loan and the likelihood of partial or full
default.
£10m and
maximum  
5 years.
10% and
maximum 5
years.
Page 161

Page 162

45 
Type of Investment Treasury Risks Mitigating Controls Council
Limits
Common
Good
Limits
c. Shareholdings in a local
authority company
These are service investments which
may exhibit market risk and are likely
to be highly illiquid.
Each equity investment in a local authority
company requires Member approval and
each application will be supported by the
service rational behind the investment
and the likelihood of loss.
50% 20%
d. Non-local authority
shareholdings
These are non-service investments
which may exhibit market risk, be only
considered for longer term investments
and will be likely to be liquid.
Any non-service equity investment will
require separate Member approval and
each application will be supported by the
service rational behind the investment
and the likelihood of loss.
5% 100%
e. Loans to third parties as
part of the Council’s
Empty Homes Strategy
These are service investments either
at market rates of interest or below
market rates (soft loans).  These types
of investments may exhibit credit risk
and are likely to be highly illiquid. 
Each third party loan requires Section 95
Officer approval and each application is
supported by the service rational behind
the loan and the likelihood of partial or full
default. Each funding request will be
accompanied by financial projections and
be subject to an assessment of the
project and borrower.
£1.5m and a
maximum of
10 years.
N/A
f. Loans to third parties as
part of the Council’s SHF
Front Funding Facility
These are service investments either
at market rates of interest or below
market rates (soft loans).  These types
of investments may exhibit credit risk
and are likely to be highly illiquid.
Each third party loan requires Section 95
Officer approval and each application is
supported by the service rational behind
the loan and the likelihood of partial or full
default. Each funding request will be
accompanied by financial projections and
be subject to an assessment of the
project and borrower.
£5m and a
maximum of
3 years.
N/A
Page 162

Page 163

46 
Type of Investment Treasury Risks Mitigating Controls Council
Limits
Common
Good
Limits
g. Loans to third parties as
part of the Council’s
Long Term Loan
Funding to RSL’s
These are service investments either
at market rates of interest or below
market rates (soft loans).  These types
of investments may exhibit credit risk
and are likely to be highly illiquid.
Each third party loan requires Section 95
Officer approval and each application is
supported by the service rational behind
the loan and the likelihood of partial or full
default. Each funding request will be
accompanied by financial projections and
be subject to an assessment of the
project and borrower.
£5m and a
maximum of
30 years.
N/A
h. Hub Co sub debt These are non-service investments
which may exhibit market risk, be only
considered for longer term investments
and will be likely to be highly illiquid.
Any non-service equity investment will
require separate Member approval and
each application will be supported by the
service rational behind the investment
and the likelihood of loss.
£10m N/A
i. Investment in a project
run by a Local Authority
or Local Authority Joint
Committee
These are investments which may
exhibit market risks and will only be
considered for medium to longer term
investments
Each investment requires approval by the
Section 95 Officer up to £250,000, and,
above this level, member approval.  Each
application will be supported by the
service rationale behind the investment
and the likelihood of loss.
£10m N/A
Page 163

Page 164

47 
Appendix 7 – Creditworthiness policy
Service and Information provided by Link Treasury Services
This Council applies the creditworthiness service provided by Link Treasury Services. This
service employs a sophisticated modelling approach utilising credit ratings from the three
main credit rating agencies - Fitch, Moody’s and Standard and Poor’s. The credit ratings of
counterparties are supplemented with the following overlays:
 Credit watches and credit outlooks from credit rating agencies
 Credit Default Swaps (CDS) spreads to give early warning of likely changes in credit
ratings
 Sovereign ratings to select counterparties from only the most creditworthy countries. 
This modelling approach combines credit rates, credit watches and credit outlooks in a
weighted scoring system which is then combined with an overlay of CDS spreads for which
the end product is a series of colour coded bands which indicate the relative creditworthiness
of counterparties.  These colour codes are used by the Council to determine the suggested
duration of investments.  
Based on the Link Treasury Services approach, the Council will therefore use counterparties
within the following durational bands:
Yellow 5 years*
Dark pink 5 years for Ultra short dated bond funds with a credit score
of 1.25
Light pink 5 years for Ultra short dated bond funds with a credit score
of 1.5
Purple 2 years
Blue 1 year (only applies to nationalised or semi nationalised UK
banks)
Orange 1 year
Red 6 months
Green 100 days
No colour Not to be used  
*The yellow colour category is for UK Government debt, or its equivalent, money
market funds and collateralised deposits where the collateral is UK Government debt.
The Link creditworthiness service uses a wider array of information other than just primary ratings.
Furthermore, by using a risk weighted scoring system, it does not give undue preponderance to
just one agency’s ratings. 
Typically, the minimum credit ratings criteria the Council use will be a short-term rating (Fitch or
equivalents) of F1 and a long-term rating of A-. There may be occasions when the counterparty
ratings from one rating agency are marginally lower than these ratings but may still be used.  In
these instances, consideration will be given to the whole range of ratings available, or other topical
market information, to support their use. 
All credit ratings will be monitored at least weekly. The Council is alerted to changes to ratings of
all three agencies through its use of the Link creditworthiness service. 
Page 164

Page 165

48 
 if a downgrade results in the counterparty / investment scheme no longer meeting
the Council’s minimum criteria, its further use as a new investment will be withdrawn
immediately.
 in addition to the use of credit ratings the Council will be advised of information in
movements in Credit Default Swap spreads against the iTraxx European Senior
Financials benchmark and other market data on a daily basis via its Passport
website, provided exclusively to it by Link. Extreme market movements may result
in downgrade of an institution or removal from the Council’s lending list.
Sole reliance will not be placed on the use of this external service.  In addition this Council
will also use market data and market information, information on government support for
banks and the credit ratings of that supporting government. 
No more than £20m can be invested with each UK bank and £15m each with any non UK
bank.  The Council will place overnight and call deposits with the Council’s bankers
irrespective of credit rating.  The Council’s Bankers currently have a credit rating which
allows deposits of up to £20m to be placed with them for up to 100 days.
Deposits can be placed with Local Authorities and other public sector bodies for a period up
to 2 years.
The Council can invest an unlimited amount of money with the Debt Management Agency
Deposit Facility (operated by the Debt Management Office which is part of HM Treasury). 
The longest period for a term deposit with the DMADF is 6 months.
Creditworthiness.
Significant levels of downgrades to Short and Long-Term credit ratings have not materialised
since the crisis in March 2020. In the main, where they did change, any alterations were
limited to Outlooks. However, more recently the UK sovereign debt rating has been placed
on Negative Outlook by the three major rating agencies in the wake of the Truss/Kwarteng
unfunded tax-cuts policy.  Although the Sunak/Hunt government has calmed markets, the
outcome of the rating agency reviews is unknown at present, but it is possible the UK
sovereign debt rating will be downgraded.  Accordingly, when setting minimum sovereign
debt ratings, this Authority will not set a minimum rating for the UK 
CDS prices
Although bank CDS prices, (these are market indicators of credit risk), spiked upwards during
the days of the Truss/Kwarteng government, they have returned to more average levels
since then. However, sentiment can easily shift, so it will remain important to undertake
continual monitoring of all aspects of risk and return in the current circumstances. Link
monitor CDS prices as part of their creditworthiness service to local authorities and the
Authority has access to this information via its Link-provided Passport portal.
Page 165

Page 166

49 
Appendix 8 – Approved Countries for Investments (08-12-22)
This list is based on those countries which have sovereign ratings of AA- or higher (we
show the lowest rating from Fitch, Moody’s and S&P) and also, (except - at the time of
writing - for Hong Kong, Norway and Luxembourg), have banks operating in sterling
markets which have credit ratings of green or above in the Link  credit worthiness service. 
AAA                     
 Australia
 Denmark
 Germany
 Netherlands 
 Norway
 Singapore
 Sweden
 Switzerland 
AA+
 Canada
 Finland
 U.S.A. 
AA
 Abu Dhabi (UAE)
 France 
AA-
 Belgium
 Qatar  
 U.K. 
Page 166

Page 167

50 
Appendix 9 – Treasury Management Scheme of Delegation 
The Council
 Overall responsibility for Treasury Management Strategy.
 Adoption of Treasury Policy Statements.
 Receive an Annual Report and other reports on the Treasury Management
Operation and on the exercise of delegated treasury management powers.
The Policy and Resources Committee
 Responsibility for the overall investment of money under the control of the Council.
 Keeping under review the level of borrowing.
 Approval of Annual Strategy Statement.
 Receiving and reviewing reports on treasury management policies, practices and
activities.
 Approval of Treasury Policy Statements.
 Implementation and monitoring of Treasury Management Policies and Practices.
The Audit and Scrutiny Committee
 Review the overall internal and management control framework related to the
treasury function.
 Review internal and external audit reports related to treasury management.
 Review provision in the internal and external audit plans to ensure there is
adequate audit coverage of treasury management.
 Monitor progress with implementing recommendations in internal and external
audit reports.
 Reviewing the treasury management policy and procedures and making
recommendations to the responsible body. 
Page 167

Page 168

51 
Appendix 10 – The Treasury Management Role of the Section 95 Officer 
Section 95 Officer:
 Recommending clauses, treasury management policy/practices for approval,
reviewing the same regularly, and monitoring compliance.
 Submitting regular treasury management policy reports.
 Suubmitting budgets and budget variations.
 Receiving and reviewing management information reports.
 Reviewing the performance of the treasury management function.
 Ensuring the adequacy of treasury management resources and skills, and the
effective division of responsibilities within the treasury management function.
 Ensuring the adequacy of internal audit, and liaising with external audit.
 Recommending the appointment of external service providers.
 Reviewing and considering risk management in terms of treasury activities.
 preparation of a capital strategy to include capital expenditure, capital financing, non-
financial investments and treasury management, with a long term timeframe 
 ensuring that the capital strategy is prudent, sustainable, affordable and prudent in the
long term and provides value for money
 ensuring that due diligence has been carried out on all treasury and non-financial
investments and is in accordance with the risk appetite of the authority
 ensure that the authority has appropriate legal powers to undertake expenditure on
non-financial assets and their financing
 ensuring the proportionality of all investments so that the authority does not undertake
a level of investing which exposes the authority to an excessive level of risk compared
to its financial resources
 ensuring that an adequate governance process is in place for the approval, monitoring
and ongoing risk management of all non-financial investments and long term liabilities
 provision to members of a schedule of all non-treasury investments including material
investments in subsidiaries, joint ventures, loans and financial guarantees ensuring that
members are adequately informed and understand the risk exposures taken on by an
authority
 ensuring that the authority has adequate expertise, either in house or externally
provided, to carry out the above
 creation of Treasury Management Practices which specifically deal with how non-
treasury investments will be carried out and managed, to include the following: -
o Risk management (TMP1 and schedules), including investment and risk
management criteria for any material non-treasury investment portfolios;  
o Performance measurement and management (TMP2 and schedules),
including methodology and criteria for assessing the performance and
success of non-treasury investments;         
o Decision making, governance and organisation (TMP5 and schedules),
including a statement of the governance requirements for decision making
in relation to non-treasury investments; and arrangements to ensure that
Page 168

Page 169

52 
appropriate professional due diligence is carried out to support decision
making;  
o Reporting and management information (TMP6 and schedules), including
where and how often monitoring reports are taken;  
o Training and qualifications (TMP10 and schedules), including how the
relevant knowledge and skills in relation to non-treasury investments will be
arranged. 
The nominated Elected Member (Policy Lead for Finance and Commercial
Services)
 Acting as spokesperson for treasury management.
 Taking a lead for elected Members in overseeing the operation of the treasury
function.
 Review the treasury management policy, strategy and reports.
 Support and challenge the development of treasury management.  
Page 169

Page 170

53
Appendix 11 – Policy on environmental, social and governance (E.S.G.)
This Council is supportive of the Principles for Responsible Investment (www.unpri.org)
and will seek to bring ESG (environmental, social and governance) factors into the decision-
making process for investments. Within this, the Council is also appreciative of the
Statement on ESG in Credit Risk and Ratings which commits signatories to incorporating
ESG into credit ratings and analysis in a systemic and transparent way. The Council uses
ratings from Fitch, Moody’s and Standard & Poor’s to support its assessment of suitable
counterparties. Each of these rating agencies is a signatory to the ESG in credit risk and
ratings statement, which is as follows:  
“We, the undersigned, recognise that environmental, social and governance (ESG)
factors can affect borrowers’ cash flows and the likelihood that they will default on
their debt obligations. ESG factors are therefore important elements in assessing
the creditworthiness of borrowers. For corporates, concerns such as stranded
assets linked to climate change, labour relations challenges or lack of transparency
around accounting practices can cause unexpected losses, expenditure,
inefficiencies, litigation, regulatory pressure and reputational impacts.
At a sovereign level, risks related to, inter alia, natural resource management, public
health standards and corruption can all affect tax revenues, trade balance and
foreign investment. The same is true for local governments and special purpose
vehicles issuing project bonds. Such events can result in bond price volatility and
increase the risk of defaults.
In order to more fully address major market and idiosyncratic risk in debt capital
markets, underwriters, credit rating agencies and investors should consider the
potential financial materiality of ESG factors in a strategic and systematic way.
Transparency on which ESG factors are considered, how these are integrated, and
the extent to which they are deemed material in credit assessments will enable
better alignment of key stakeholders.
In doing this the stakeholders should recognise that credit ratings reflect exclusively
an assessment of an issuer’s creditworthiness. Credit rating agencies must be
allowed to maintain full independence in determining which criteria may be material
to their ratings. While issuer ESG analysis may be considered an important part of
a credit rating, the two assessments should not be confused or seen as
interchangeable.
With this in mind, we share a common vision to enhance systematic and
transparent consideration of ESG factors in the assessment of
creditworthiness.”
For short term investments with counterparties, this Council utilises the ratings provided by
Fitch, Moody’s and Standard & Poor’s to assess creditworthiness, which do include
analysis of ESG factors when assigning ratings. The Council will continue to evaluate
additional ESG-related metrics and assessment processes that it could incorporate into its
investment process and will update accordingly.
Page 170

Page 171

ARGYLL AND BUTE COUNCIL            AUDIT AND SCRUTINY COMMITTEE
CHIEF EXECUTIVE                     16 MARCH 2023 
BEST VALUE IMPROVEMENT ACTION PLAN UPDATE 
1.0 EXECUTIVE SUMMARY 
1.1. The purpose of this report is to provide members a final update on the Best Value
Improvement Action Plan which emerged from the Accounts Commission findings
on the Controller of Audits Statutory Report on the Council. 
1.2. The action plan was agreed by the Council in June 2020 and an update was
provided to the Audit and Scrutiny Committee in March 2021 and 2022.  Audit
Scotland’s 2020/21 Annual Audit Report (November 2022) concludes that the
Council has an appropriate and effective best value framework in place and
continues to make good progress addressing the recommendations in Best
Value Assurance Report 2020. 
1.3. The Committee will recall in our last report in March 2022, of the 36 actions set
out within the original improvement plan, 22 were completed and the intent was
to bring back an update on the remaining 14 actions.   
1.4. Members are asked to note the full update as set out within appendix 1. 
1.5. Members are also asked to note that as CEO I have set in process the
development of a change programme that seeks to ensure the organisation is
able to meet the financial, policy and societal challenges ahead.  This will
influence a new Best Value action plan which I will bring to this committee for its
consideration. 
Page 171 Agenda Item 12

Page 172

ARGYLL AND BUTE COUNCIL            AUDIT AND SCRUTINY COMMITTEE 
CHIEF EXECUTIVE                                            16 MARCH 2023 
BEST VALUE IMPROVEMENT ACTION PLAN UPDATE 
2.0 INTRODUCTION 
2.1 The purpose of this report is to provide members a final update on the Best
Value Improvement Action Plan and an introduction to a forthcoming change
programme from which will emerge a new Best Value action plan to support the
organisation in meeting the challenges ahead. 
3.0 RECOMMENDATIONS 
3.1 The Audit and Scrutiny Committee notes below an update against the themes of
the Best Value Improvement Action Plan and the associated table set out within
appendix. 
3.2 Members are also asked to note an introduction to the forthcoming change
programme and that a new Best Value action plan will be presented for the
consideration of this committee at a future meeting. 
4.0 DETAIL 
4.1 In September 2020, the Audit and Scrutiny Committee considered the findings
report and recommendations from the Accounts Commission Findings on the
Controller of Audit Scotland’s Statutory Report on the Council.  The Committee
also noted the action plan that was agreed by the Council in June 2020 and
this report provides a third and final update on the plan (with previous updates
having been submitted to this committee in March 2021 and 2022).  
Page 172

Page 173

4.2 Audit Scotland’s 2020/21 Annual Audit Report (November 2022) concluded
that the Council has an appropriate and effective best value framework in
place and continues to make good progress addressing the recommendations
in Best Value Assurance Report 2020. 
4.3      The Committee will recall in our last report in March 2022, of the 36 actions set         
out within the original improvement plan, 22 were completed and the intent was   
to bring back an update on the remaining 14 actions and a summary of these       
can be found below. 
4.4 Theme 1; Develop the transformation agenda, supported by an affordable and
achievable medium to longer term financial strategy.  The outstanding action
(BV1.2) relating to the provision of a Capital Strategy remains ongoing.  The
draft plan has been through a number of revisions and during this period the
Council’s Executive Leadership Team appointed in June 2022 on internal
secondment a Corporate Programme Coordinator to undertake a holistic
review of the organisations approach to prioritisation and phasing of capital
projects with an objective to develop a long term ‘pipeline of projects’.  This
has positively influenced the Capital Strategy and a final draft version will
come to the Policy and Resources Committee in August 2023. 
4.5 Theme 2; Improve performance management reporting to provide a balanced
picture of long term trends in performance against targets.   
4.6 Action BV2.3 to procure or develop a performance system in house whilst
delayed has progressed.  Previously a specification for a new performance
system was agreed and a procurement exercise was undertaken with no
satisfactory outcome with regards to price.   An alternative and more holistic
approach was undertaken to seek to self-develop an organisational data
platform that will provide a performance dashboard.  Work has commenced
on building the new dashboard for the Area Performance Reports that are
submitted to Area Committees and will go live for FQ1 2023/24. This activity is
linked to the data initiative on which there is more information at paragraph
4.8 below. 
4.7 A review of public performance reporting will be undertaken as part of a wider
review of the organisations Performance Improvement Framework which is re-
scheduled to be completed by September 2023. 
4.8 Theme 3; Increase the pace of transformational change to deliver the
business outcomes.   
Page 173

Page 174

4.9 Action BV3.3 sets out the requirement to complete an options appraisal on
data analytics/business intelligence as a tool to inform transformation and
improvement.  This work was initially delayed due to the COVID 19 pandemic.   
4.10 In November 2021, the Executive Leadership Team learned from Aberdeen
City Council on their journey to harness data to improve decision making.
Subsequently the Council’s Executive Leadership Team instructed ICT to
consider options for the development of our own in-house system using
Microsoft 365 technology.  In October 2022 ELT, having reviewed the options,
agreed a business case to self-develop an ‘on site’ data platform (i.e. not in
the ‘cloud’) and secure additional resource to develop data ‘products’ (e.g.
dashboards).   
4.11 The prioritisation and development of data ‘products’ is directed by the 
internal Data Advisory Group consisting of senior officers from across the
organisation.  The Head of Customer Support Services chairs the Data
Advisory Group which is accountable to the Council’s Executive Leadership
Team. 
4.12 It is through this endeavour that the Council is developing a new in-house
system to produce performance dashboards.  Whilst still early in its
development, the Data Advisory Group and its associated data platform will in
time become powerful agents for the provision of real time data to improve
decision making.   
4.13 A particularly pioneering and emerging product is a Cost of Living Data
Dashboard which is a collaboration combining data on council tax reductions,
council tax arrears, applications to the Scottish Welfare Fund, average income
(by post code) and the Scottish Index of Multiple Deprivation to provide an
insight into possible areas of need across our areas. The data is grouped by
school catchment areas as schools are being viewed as a means to address
the target audience where need is deemed greatest.  This data dashboard
has been shared with the Council’s Financial Inclusion Action Group who
intend to direct action on targeted support based on the data provided.  It is
important to note that this work is in its infancy and illustrates what can be
achieved through collaboration, knowledge and with the right tools.   
4.14 Action BV3.8; the Council is on track to reduce the number of ICT applications
in use by 10% by March 2023 with the implementation of MS 365 contributing
to the reduction of standalone applications. 
4.15 With the introduction of MS365 we have a number of examples of council staff
relying less on legacy systems and applications. The performance
management system (Pyramid) will be decommissioned shortly with the new
Page 174

Page 175

data management project providing a new opportunity to collate, analyse, and
report on performance data in a more efficient manner. Similarly, we no longer
use external paid for services from companies like Survey Monkey because
we can run our own internal surveys using MS Forms. We’re using automated
forms to speed up approvals processes for the most common forms. 
4.16 We no longer use our bespoke Video Conferencing systems as MS Teams
enables us to meet, communicate, and collaborate across the entire Scottish
public sector. We have learned to collaborate across network boundaries in
Teams channels and this has contributed to a reduction in emails and fewer
external telephone calls as partners and suppliers are more accessible and
contactable via federated links on MS365. 
4.17 We see significant environmental benefits from our new approach to printing.
We no longer print and post council committee papers with all now distributed
online and we have removed all personal desktop printers from offices and
use strategically placed and more efficient multi-function print and copy
devices across the entire corporate and education estates. 
4.18 Theme 4; Assess the extent to which regeneration and economic
development initiatives are delivering the vision and corporate outcomes. 
4.19 For the review, appraisal and monitoring of regeneration and economic
initiatives, the Council now has in place adoption of best practice as set out by
the UK Government (i.e. Her Majesty’s Treasury Green Book Guidance). 
4.20 Post project evaluation is now business as usual for large capital projects and
work is ongoing to streamline this activity for all capital projects.  An external
audit was undertaken to assess the training requirements and a tailored
training programme was put in place.  The programme is now largely
complete for 75% of officers and will be completed later this year. 
4.21 Theme 5; Work with communities and community groups to improve
engagement. 
4.22 Actions in relation to measuring satisfaction with communities (BV5.1 and
5.2).  As part of the performance excellence project, the project team liaised
with the Customer Engagement and Transformation Manager to develop a
new corporate customer satisfaction survey which will be issued October 2023
and will be repeated annually to provide trend data on organisational
customer satisfaction. 
4.23 On identifying priorities for better future engagement (action BV 5.4), the
Council’s Executive Leadership Team (ELT) will agree in the summer 2023 a
Page 175

Page 176

programme of Service Re-Design where services will be co-designing
services with stakeholders.  This will be a long term programme informed by a
service self-assessment programme that will be rolled out in the spring to
support the determination of priorities and phasing of the programme.   
4.24 Members will note that of those actions within the original Best Value Action
Plan not yet complete are in progress and will be completed this year and for
this reason as CEO, looking forward to the future challenges of our
organisation, a new programme of Best Value activity will be prepared for the
consideration of this committee at a future meeting.   
4.25 Argyll and Bute Council is operating in a dynamic landscape which brings with
it many opportunities and challenges. The operations of the council have done
well to meet the challenges faced so far.  There is a need to develop the
organisation to be in a position to continue to meet the financial, policy and
societal challenges ahead.   
4.26 Our operations as a Council so far have risen to the challenge of meeting
substantial savings and to date has made over £70million in recurring savings
since 2010-2011, including £500k reduction in senior management costs.  This
equates to around 26% of total budget and with each passing year it becomes
more difficult to identify savings. 
4.27 The Accounts Commission describes our approach as “having successfully
achieved financial balance through a focus on cost reductions.  Although the
Council’s transformation programme has delivered some efficiencies and
achieved small scale savings, further work is required to better align its financial
and transformation plans to drive meaningful change through new and
innovative ways of working”.  (Best Value Assurance Report 2020). 
4.28 As acknowledged by others, driving change was particularly challenging during
the period that the public sector was in response mode to the pandemic and
now having returned to some form of normality, to meet the complex challenges
our communities face and changes anticipated in the public sector the council
needs to adapt the way it operates. 
4.29 As CEO I am bringing forward a change programme and the council’s operating
model will transform over the next 4 years based on the following principles and
through a programme of service redesign and other activity. 
a) We are one council, one place – with the organisation working across
professional and service boundaries, collaboratively for the greater good of
the population they serve. Reducing silo working and increasing joint
activity across organisations and with partners to improve outcomes. 
Page 176

Page 177

b) We focus on our purpose and mission– clearly prioritising politically agreed
objectives to achieve the greatest possible impact with limited resources,
with shared ownership of efforts to achieve common goals. 
c) Our employees are empowered – delegate decisions against agreed
objectives to speed up decision making and problem solving, harnessing
their skills and increasing staff satisfaction. 
d) We take decisions informed by data – targeting resources to where they
are most needed and evaluating the effectiveness of what we do. 
e) We are a learning council – a consistent approach to external and self-
evaluation to realise continuous improvement. 
f) We are agile and adapt to change. 
g) We maximise opportunities that technology offers 
4.30 Details on the change programme and a new Best Value Action Plan will be
brought to this committee at the first available opportunity.   
5.0 CONCLUSION
5.1 Progress has continued to be made and the programme will be successfully
completed this year.  In order to demonstrate how the Council is looking forward,
it is intended to bring to this committee new Best Value Action Plan at the first
available opportunity against which this committee can continue to scrutinise
Council’s endeavours to continue to improve best value in the face of an
increasingly challenging landscape. 
6.0 IMPLICATIONS
6.1 Policy; none.
6.2 Financial; none.
6.3  Legal; the Council requires to comply with the statutory requirements. 
6.4  HR; none
6.5  Fairer Scotland Duty: none
6.5.1   Equalities - protected characteristics; none
6.5.2   Socio-economic Duty; none
Page 177

Page 178

6.5.3   Islands; none
6.6. Climate Change; none.
6.7 Risk; none.
6.8  Customer Service; none. 
Pippa Milne
Chief Executive
22 February 2023
For further information contact:
 Jane Fowler, Head of Customer Support Services
 Stuart Green, Corporate Support Manager, Chief Executives Unit 
APPENDICES
Appendix   1; Best Value 3 Improvement Action Plan v4 
Page 178

Page 179

Best Value 3 Action Plan V4 – February 2023
Reference Theme Actions to
achieve
outcomes
Success
Measures
Key Dates Lead Progress
BV1.2 Develop the
transformation
agenda,
supported by an
affordable and
achievable
medium to longer
term financial
strategy 
Complete capital
strategy and
launch revised
capital process. 
Capital
Strategy and
process is
launched
May 2021
August 2022
August 2023
Head of CS An update was provided to the Policy
and Resources Committee on the 14
October 2021. 
The Executive Leadership Team
appointed in June 2022 on internal
secondment a Corporate Programme
Coordinator to undertake a holistic
review of the organisations approach to
prioritisation and phasing of capital
projects with an objective to develop a
long term ‘pipeline of projects’ which will
emerge over the coming 12 months and
significantly influence the Capital
Strategy. 
In addition, ELT completed a review of
the Strategic Asset and Group Asset
Management Plans process to improve
the value of the process and its outputs
to support Members in its decision
making. 
The Capital Strategy has gone through a
number of revisions and final draft
version will be submitted to the Council’s
Policy and Resources Committee
August 2023. 
Page 179

Page 180

Best Value 3 Action Plan V4 – February 2023
Reference Theme Actions to
achieve
outcomes
Success
Measures
Key Dates Lead Progress
BV2.3 Improve
performance
management
reporting to
provide a
balanced picture
of long-term
trends in
performance
against targets.
Review the
approach to
performance
management
reflecting:
- Clear links to
strategic
priorities
- Meaningful
indicators,
taking account
of trend data
and
benchmarking
The need for a
simple and
effective system
for recording and
presenting data
New system
procured or
developed in-
house
Dec 2021
July 2023
Head of
CSS
The project Team developed a
specification for ICT functionality which
was signed off by ELT.  A procurement
Exercise was undertaken with no
satisfactory outcome with regards to
price.   
An alternative and more holistic
approach was undertaken to seek to
develop an organisational data platform
that will provide a performance
dashboard; see BV3.3 for more
information. 
Work has commenced on building a new
dashboard for the Area Performance
Reports that are submitted to Area
Committee and will go live for FQ1
2023/24. 
BV2.5 Improve public
performance
reporting. 
Review of
public
performance
reporting
complete 
March 2022
September
2023
Head of
CSS
This will be included within a review of
the Performance Improvement
Framework with a report scheduled to
go to Council September 2023. 
BV3.3 Increase the
pace of
transformational
change to deliver
Develop data
analytics/business
intelligence as a
tool to inform
Options
appraisal on
data analytics
approach
complete
March 2021
Complete 
Head of
CSS
Initially delayed due to Covid.  Further to
learning from Aberdeen City Council on
their ‘data journey’, the Council’s
Executive Leadership Team agreed
January 2022 in principle to the
Page 180

Page 181

Best Value 3 Action Plan V4 – February 2023
Reference Theme Actions to
achieve
outcomes
Success
Measures
Key Dates Lead Progress
the business
outcomes 
Transformation
and Improvement 
development of an in-house system
using Microsoft 365 technology.  This
initiative will allow the Council via a self-
build to take data from across various
systems into a single ‘data platform’ (i.e.
integrated set of technologies that
collectively creates the data in an
accessible format like a dashboards). 
The Executive Leadership Team (ELT)
agreed in October 2022 a business case
to develop an on-site data platform and
create capacity to commence
development of data dashboards as
directed by the Data Advisory Group (an
officer group accountable to the ELT).   
BV3.4 Implement
programme of
modernising
education
services. 
Reports on
progress to
elected
members at
appropriate
stages of
programme
Complete  Exec Dir February 2021 - Members Seminar
online learning. 
June 2021 – Education Change
Programme; report on key findings of all
10 workstreams reported to Community
Services Committee June where it was
agreed to progress with a programme of
engagement with communities, staff,
representative bodes and wider
stakeholders on the school leadership
model.   
Page 181

Page 182

Best Value 3 Action Plan V4 – February 2023
Reference Theme Actions to
achieve
outcomes
Success
Measures
Key Dates Lead Progress
Community Choices Committee agreed
in August 2022 not to progress key
recommendations and other actions will
be picked up as normal business. 
BV3.5 Implement
programme of
modernising
education
services. 
Modernisation
programme is
complete
Complete Exec Dir ‘Empowering our Educators’ community
engagement and consultation exercise
commenced 29.11.21 running through to
04.02.22 to discuss and co-develop
proposals. 
Community Choices Committee agreed
in August 2022 not to progress key
recommendations and other actions will
be picked up as normal business. 
BV3.8 Make full use of
improved
technology to
transform service
delivery and
reduce burden on
front line services 
Simplify
administrative
processes by
reducing the
number of ICT
applications in
use by 10%
March 2023 Head of
CSS
On track. Strategic context set by the
approved ICT and Digital Strategy.   
Digital by Default budget theme has
contributed to revenue budget
reductions through agile working, hybrid
meetings and significant reduction in
printing, postage and travel; 
Implementation of MS365 has
contributed to reduction of standalone
applications such as Survey Monkey
and Pyramid. Phases 2 and 3 underway
to maximise use of M365 Business Apps
and Streamline Information
Page 182

Page 183

Best Value 3 Action Plan V4 – February 2023
Reference Theme Actions to
achieve
outcomes
Success
Measures
Key Dates Lead Progress
Management. Further reductions will be
implemented and monitored via ICT and
Digital Strategy, including via new HR
and Payroll system. Robotic Process
Automation will begin implementation in
23/24 
BV4.2 Assess the
extent to which
regeneration and
economic
development
initiatives are
delivering the
vision and
corporate
outcomes
Create inter-
departmental
Project Review
Team and scope
review of project
process to align to
BV3 Objective
Project Review
Plan to be
approved by
Capital
Investment
Board
December
2020
December
2023
Major
Project
Programme
Manager 
Key resources identified within
Programme & Project Management
Service Economic Development,
Strategic Finance and Procurement. 
Council’s response to COVID pandemic
delayed the work considerably. 
Post project evaluation is in place for
large capital projects and will be
streamlined through the Asset
Management Board.  New scoring
mechanism developed to support
evaluation. 
BV4.3 Implement
updated Project
Process for
Options &
Evaluation. 
Launch at
Capital
Investment
Board 
April 2021
August 2023
MPPM The new streamlined approach will be
launched at the August meeting of the
Capital Investment Board.
BV4.4 Training /
Mentoring for
Project
Delivery of
training
recorded
September
2021
Project
Review
Team
An external audit was undertaken to
assess training requirement. 
Page 183

Page 184

Best Value 3 Action Plan V4 – February 2023
Reference Theme Actions to
achieve
outcomes
Success
Measures
Key Dates Lead Progress
Practitioners in
updated Project
Process for
Options &
Evaluation 
September
2023 
Training now largely 75% completed
and will be completed by September
2023. 
BV5.1 Work with
communities and
community
groups to
improve
engagement
Engage with
communities to
understand and
improve levels of
satisfaction with
council services in
order to
understand and
address their
concerns 
Develop co-
ordinated
approach to
measuring
satisfaction
with
communities.
Dec 2021
Oct 2023
Head of
CSS
As part of the performance excellence
project, the project team liaised with the
Customer Engagement and
Transformation Manager to develop a
new corporate customer satisfaction
survey which will be issued October
2023.
BV5.2 Trends are
measured as
well as
individual
survey
outcomes 
Dec 2021
October 2023
Head of
CSS
The survey described above will ensure
trend data over a longer period.
BV5.4 Improve the
quality of
engagement with
our communities
and reflect this in
service
improvements
Identify
priorities for
better future
engagement
Sept 2021
June 2023
Head of
CSS
The Executive Leadership Team (ELT)
will decide in the spring 2023 a
programme of Service Co-Design where
services will be co-designing services
with stakeholders.  This will be a long
term programme informed by service
self-assessment programme. 
Page 184

Page 185

Best Value 3 Action Plan V4 – February 2023
Reference Theme Actions to
achieve
outcomes
Success
Measures
Key Dates Lead Progress
BV5.5 Implement a
programme to
improve
engagement skills
across the
organisation.
Training
materials
developed and
programme
rolled out
June 2022
June 2023
Head of
CSS/CPP
Manager
The Executive Leadership Team (ELT)
directed a review and agreed a new
Community Engagement Guidance
document that will be rolled out to
employees. 
The ELT also agreed to establish a
working group to further evolve the
guidance into a clear framework to
provide greater guidance, flowchart and
tools for services to engage the
community.  This activity will link to the
training for Service Design that will be
rolled out this year (2023). 
Page 185

Page 186

This page is intentionally left blank

Page 187

ARGYLL AND BUTE COUNCIL  AUDIT AND SCRUTINY COMMITTEE
FINANCIAL SERVICES  16 MARCH 2023 
INTERNAL AUDIT CHARTER AND INTERNAL AUDIT MANUAL 
1. SUMMARY  
1.1  This report outlines the proposed changes to the Internal Audit Charter and
Internal Audit Manual.  Both have been updated to reflect minor changes in the
working practices within Internal Audit. 
2. RECOMMENDATIONS 
2.1 To approve the amended Internal Audit Charter (Appendix 1).  
2.2 To approve the amended Internal Audit Manual (Appendix 2).
3.0  DETAIL. 
3.1 Under the Public Sector Internal Audit Standards (PSIAS) Internal Audit is
required to prepare an Internal Audit Charter, consistent with the Mission of
Internal Audit that defines internal audit’s purpose, authority and responsibility. 
3.2 However just having a Charter is not sufficient to comply with the requirements
of PSIAS.  The requirement for a Charter is just one element of PSIAS.  Full
compliance requires the adoption of a range of principles and working practices
which are closely aligned to the requirements as set out in PSIAS. 
3.3 Whilst there is no written requirement, within PSIAS, for an Internal Audit
Manual to be created, in general, it is considered good practice to develop a
manual to help guide the overall management and administration of the
department and the audit approach adopted.  Given the mandatory nature of
PSIAS it also makes sense for that manual to be consistent with the
requirements of PSIAS. 
3.4 The Charter and Manual were both fully revised by the Chief Internal Auditor
(CIA) in 2018 and subject to annual review and Committee approval in each
subsequent March.  As a consequence the amendments made in this 2023
review are very minor in nature and summarised in the table below: 
Internal Audit Charter 
Page Para Summary of change
Front N/A Date updated.
6 30 Amended to reflect that the Counter Fraud Team are
Page 187 Agenda Item 13

Page 188

permanent 
7 33 Paragraph updated to reflect new updated approach to the
PRD process and to confirm this will be undertaken on an
annual basis.
8 42 Changed approval date to this Committee  
Internal Audit Manual 
Page  Para Summary of change
Front N/A Date updated.
4 6 In terms of consistency reflect that Douglas Hendry is both an
Executive Director and Monitoring Officer
7 20 Paragraph updated to reflect new approach to the PRD
process and to confirm that this will be undertaken on an
annual basis
11 46 To amend the date to reflect the current timeframe of reference
12 52 To insert missing word ‘of’ after achievement in the first bullet
point
16 94 Removal of previous reference to Internal Audit database as
‘Follow Up’ actions are now recorded on SharePoint 
4.0  CONCLUSION 
4.1 The Internal Audit Team has updated the Internal Audit Charter and Internal
Audit Manual in line with the requirements of the PSIAS. 
5.0 IMPLICATIONS
5.1
5.2
5.3
5.4
5.5
5.5.1
5.5.2
5.5.3
5.6
5.7
5.8
Policy – Internal Audit continues to adopt a risk based approach to activity
Financial – None  
Legal – None
HR – None 
Fairer Scotland Duty – None
Equalities – None
Socio-Economic Duty – None
Islands Duty – None
Climate Change - None
Risk – A consistent audit approach helps reduce the Council’s risk exposure
Customer Service - None 
Paul Macaskill
Chief Internal Auditor
16 March 2023  
For further information please contact: Internal Audit (01436  604108) 
Appendices:
1. Internal Audit Charter
2. Internal Audit Manual 
Page 188

Page 189

Argyll and Bute Council
Internal Audit Charter
March 2023 
Page 189

Page 190

2 
Contents
Introduction ....................................................................................................................................... 3
Internal Audit Mission (PSIAS Section 3) ............................................................................................. 3
Definition of Internal Auditing (PSIAS Section 4).................................................................................. 3
Definition of Roles.............................................................................................................................. 3
Purpose of Internal Audit ................................................................................................................... 3
Authority and Scope ........................................................................................................................... 4
Independence and Objectivity ............................................................................................................ 4
Organisation ...................................................................................................................................... 5
Resourcing ......................................................................................................................................... 5
Responsibility and Scope .................................................................................................................... 6
Fraud and Corruption ......................................................................................................................... 6
Professionalism .................................................................................................................................. 7
Internal Audit Plan ............................................................................................................................. 7
Reporting and Monitoring .................................................................................................................. 8
Periodic Assessment........................................................................................................................... 8
Approval ............................................................................................................................................ 8 
Page 190

Page 191

3 
Introduction
1. The Local Authority Accounts (Scotland) Regulations 2014 introduced a requirement for all Scottish
Local Authorities to operate a professional and objective internal auditing service, which must be
delivered in accordance with recognised standards. The standards and practices applied in the UK
for all public sector internal audit providers, in-house, shared or outsourced, are the Public Sector
Internal Audit Standards (the Standards), which came into effect in April 2013, and were updated in
March 2017. 
2. The Standards require the Argyll and Bute Council (the Council) to have an Internal Audit Charter
(the Charter), consistent with the Mission of Internal Audit, that defines internal audit’s purpose,
authority and responsibility. 
Internal Audit Mission (PSIAS Section 3)
3. It is internal audit’s mission to enhance and protect organisational value by providing risk-based and
objective assurance, advice and insight.
Definition of Internal Auditing (PSIAS Section 4)
4. Internal auditing is an independent, objective assurance and consulting activity designed to add
value and improve the Council’s operations. It helps the Council accomplish its objectives by
bringing a systematic, disciplined approach to evaluate and improve the effectiveness of risk
management, control and governance processes.
Definition of Roles 
5. The Standards require that the Internal Audit Charter defines the terms ‘board’, ‘senior
management’ and ‘Chief Audit Executive’ in relation to the work of Internal Audit. For the purposes
of Internal Audit work: 
 Board -  refers to the Council’s Audit and Scrutiny Committee (the Committee) which has
delegated responsibility for overseeing the work of Internal Audit
 Senior management - is defined as the Chief Executive and members of the Council’s
Strategic Management Team (SMT)
 Chief Audit Executive - refers to the Chief Internal Auditor (CIA).
Purpose of Internal Audit
6. The main objective of Internal Audit is to provide, in terms of the PSIAS, a high quality, independent
audit service to the Council which provides annual assurances in relation to internal controls and
overall governance arrangements.  In addition to this primary assurance role, Internal Audit will
also:
 support the Executive Director (Kirsty Flanagan) (s95 officer) and the Committee in the
discharge of their duties
 support the Council’s Monitoring Officer (Douglas Hendry)
 support the Council’s anti-fraud and corruption arrangements 
 provide advice and guidance on control implications for new or changed systems where
appropriate 
 support the Council and the SMT during key transformational / change projects.
Page 191

Page 192

4 
7. Internal Audit may also provide an independent and objective consultancy service, which is advisory
in nature and generally performed at the specific request of service management. The aim of the
consultancy service is to help line management improve the Council’s risk management, governance
and internal control. A specific contingency will be made in the internal audit plan to allow for
management requests and consultancy work. The CIA will consider the effect on the opinion work
before accepting consultancy work or management requests over and above the contingency
allowed for in the internal audit plan. Such consultancy work will only be undertaken where
resources permit without impacting on the annual assurance process. In line with the PSIAS,
approval will be sought from the Committee before any significant unplanned consultancy work is
accepted. 
8. The Internal Audit activity is established by the Committee with Internal Audit’s responsibilities
defined by the Committee as part of their oversight role.
Authority and Scope
9. Internal audit, with strict accountability for confidentiality and safeguarding records and
information, has authorised full, free, and unrestricted access to any and all of the Council’s records,
physical properties, and personnel pertinent to carrying out any engagement. All employees are
requested to assist Internal Audit in fulfilling its roles and responsibilities. Internal Audit, through
the CIA, will also have free and unrestricted access to the Committee. Designated auditors are
entitled, without necessarily giving prior notice, to require and receive: 
 access to all records, documents and correspondence relating to any financial or other
relevant transactions, including documents of a confidential nature
 access at all reasonable times to any land, premises, officers and members of the Council 
 the production of any cash, stores or other property of the Council under an officer’s and
member’s control 
 explanations concerning any matter under investigation. 
10. Where the Council works in partnership with other organisations, the role of internal audit will be
defined on an individual basis. Where Internal Audit undertakes work on behalf of any other
organisations, this will be determined in conjunction with the Committee and in consultation with
the SMT to ensure that appropriate audit resources are available to provide assurance over the
Council’s activities. Internal Audit currently provide audit services to LiveArgyll, the arrangements
for internal audit have been agreed with LiveArgyll’s General Manager who reports to LiveArgyll’s
Finance and Audit Sub-Committee. As of 1 April 2021 Internal Audit will be proving audit services to
the Argyll and Bute Health and Social Care Partnership (HSCP). Arrangements for that service have
been agreed with the HSCP’s Head of Finance and Transformation.
Independence and Objectivity
11. Internal Audit will remain free from interference by any element in the organisation, including
matters of audit selection, scope, procedures, frequency, timing, or report content. This will ensure
that the work of Internal Audit is independent and objective.
12. Internal auditors will have no direct operational responsibility or authority over any of the activities
audited. Accordingly, they will not implement internal controls, develop procedures, install systems,
prepare records, or engage in any other activity that may impair the internal auditor's judgment.
Page 192

Page 193

5 
13. The CIA has additional responsibilities for risk management and counter fraud arrangements.  The
CIA will declare an interest for audit assignments in these areas with the next most senior internal
audit team member taking additional reporting responsibilities where such conflicts arise.  This
arrangement will address the recognised independence issues arising from the CIA’s other
responsibilities. A further option, if required, is for the CIA of another local authority to provide
oversight of an audit where there is a possible conflict of interest. 
14. Internal auditors must exhibit the highest level of professional objectivity in gathering, evaluating,
and communicating information about the activity or process being examined, as detailed in the
Chartered Institute of Internal Audit’s Code of Ethics. 
15. Internal auditors must also make a balanced assessment of all the relevant circumstances and not
be unduly influenced by their own interests or by others in forming judgments, as detailed in the 7
Principles of Public Life (the ‘Nolan principles’).
16. Each member of the Internal Audit team completes a register of interest and updates it, at a
minimum, on an annual basis.
17. The CIA will confirm to the committee, at least annually, the organisational independence of
Internal Audit.
Organisation
18. The CIA is the officer responsible to the Committee for the provision of an independent Internal
Audit service. The CIA will discharge this responsibility through the direct application of internal
audit resources.  
19. The CIA reports, on an administrative basis, to the Head of Financial Services who is a member of
the SMT.  However the CIA also has unrestricted access to those charged with governance,
specifically: Elected Members; the Chief Executive; Executive Directors including the Executive
Director who is the Council’s Monitoring Officer.
20. The CIA has direct access to the Chair of the Committee to discuss any matters the Committee or
auditors believe should be raised privately. One of the functions of the Committee is to ensure that
no unjustified restrictions and limitations are made to the scope and activities of Internal Audit.
Additionally, unrestricted access to all Officers of the Council is afforded to all members of the
Internal Audit service. 
21. The CIA is required to hold a professional qualification and be suitably experienced with other team
members having suitable experience and/or be working towards a relevant qualification.
Resourcing
22. The CIPFA Local Government Application note for applying PSIAS states that ‘No formula exists that
can be applied to determine internal audit coverage needs. However, as a guide, the minimum level
of coverage is that required to give an annual evidence based opinion. Local factors within each
organisation will determine this minimum level of coverage’. 
23. It is the CIA’s responsibility to ensure that resourcing arrangements are in place to deliver the
annual risk based internal audit plan and that those resources are flexible enough to cope with
special requests. Where applicable the CIA may seek additional input from external providers.
24. The internal audit plan will document the budgeted resource requirements for the audit year. It will
also include a contingency to address unplanned work. Should circumstances arise during the year
that suggests that available resource levels will fall or appear to be falling below the level required
Page 193

Page 194

6 
to deliver the plan, the CIA will communicate the impact of resource limitations and significant
interim changes to the Committee.
Responsibility and Scope
25. The scope of internal auditing encompasses, but is not limited to, the examination and evaluation of
the adequacy and effectiveness of the Council's governance, risk management, and internal control
processes in relation to the Council's defined goals and objectives. This recognises that Internal
Audit’s remit extends to the entire control environment of the organisation. 
26. Internal Audit is not a substitute for the operation of effective internal controls, which are the direct
and sole responsibility of management.  However, Internal Audit’s specific commitments do include
(but are not necessarily limited to) the following:
 examining and evaluating the adequacy of the Council's system of internal control, including
those pertaining to the deterrence, detection and investigation of fraudulent or illegal acts
 reviewing the reliability and integrity of financial and operating information and the means
used to identify, measure, classify and report such information
 reviewing the systems established to ensure compliance with those policies, plans,
procedures, laws and regulations which could have a significant impact on operations
 reviewing the means of safeguarding assets and, as appropriate, verifying the existence of
such assets
 appraising the economy and efficiency with which resources are employed and the quality of
performance in carrying out assigned responsibilities
 coordinating Internal Audit activities with the work of the External Auditors and assisting
them as required.
27. Based on its activity, Internal Audit is responsible for reporting significant risk exposures and control
issues identified to the Committee and the SMT including fraud risks, governance issues, and other
matters needed or requested by the Committee.
Fraud and Corruption
28. Managing the risk of fraud and corruption is the responsibility of the SMT. Management is also
responsible for developing, implementing and maintaining systems of internal control to guard
against fraud or irregularity and ensure probity in systems and operations. Internal Audit will assist
management by reviewing the controls and procedures in place.
29. Audit procedures alone cannot guarantee that fraud and corruption will be detected, nor does
Internal Audit have the responsibility for prevention and detection of fraud. However, individual
auditors will be alert in their work to risks and exposures that could allow a fraud, irregularity or
corrupt practice to take place.
30. Where any matter arises which involves, or is thought to involve, a fraud, corruption or financial
irregularity, the relevant Head of Service / Executive Director will notify the Council’s Monitoring
Officer, Head of Financial Services and the CIA for consideration of appropriate action. Further
guidance can be found in the Council’s Anti-Fraud strategy and Public Interest Disclosure Policy. The
Council’s Counter Fraud Team reports directly to the CIA so the CIA will be involved in overseeing
any investigation and will liaise with the Council’s Monitoring Officer during the investigation of the
alleged fraud and in particular:
Page 194

Page 195

7 
 examine current Council policies, procedures and financial controls, their current working and
effectiveness in relation to the alleged fraud
 report to the SMT in relation to the adequacy of current Council policies, procedures and
financial controls in relation to the alleged fraud and make recommendations for their
revision
 provide advice and assistance to the Monitoring Officer in relation to Council policies,
procedures and financial controls and control issues relevant to the investigation of the
alleged fraud.
Professionalism
31. Internal Audit will adhere to the Standards, which are based on the Chartered Institute of Internal
Auditors' mandatory guidance including the Definition of Internal Auditing, the Code of Ethics, and
the International Standards for the Professional Practice of Internal Auditing. This mandatory
guidance constitutes principles of the fundamental requirements for the professional practice of
Internal Auditing and for evaluating the effectiveness of the Internal Audit’s performance.
32. Other professional guidance will also be adhered to as applicable to guide operations. In addition,
Internal Audit will adhere to the Council’s relevant policies and procedures and Internal Audit’s
manual.
33. To ensure that auditors maintain and enhance their knowledge, skills and audit competencies an
updated approach to the PRD process,  based on measuring and improving outcomes from
conversations between managers and employees about performance and career/development
aspirations will be adopted. This process will be undertaken on an annual basis.
Internal Audit Plan
34. At least annually, the CIA will submit an Internal Audit plan that includes risk assessment criteria to
the Committee for review and approval. The CIA will communicate the impact of any resource
limitations and significant interim changes to the SMT and the Committee.
35. The Internal Audit plan will be developed based on a prioritisation of those key risks facing the
Council including input of the SMT and the Committee.  The plan will be flexible in nature, can be
updated to reflect the changing risks and priorities of the Council, and will take into account:
  the Council’s risk registers and risk management framework 
 a balance of coverage across all operational areas (this constitutes the assurance nature of
the plan ensuring an adequate level of internal audit review annually within each service)
 experience gained from previous Internal Audit activity 
 the impact of national issues (e.g. economic factors, the introduction of new legislation)
 the impact of local issues (e.g. corporate or service action plans) 
 periodic review of core financial and operational systems 
 the available audit resource and skills
 staff development and training 
 time needed for the management of the Internal Audit service 
 contingency set aside for consultancy, reviews or investigations
Page 195

Page 196

8 
 liaison with other assurance providers such as the External Auditor and other scrutiny bodies.
Reporting and Monitoring
36. Following the conclusion of each Internal Audit engagement, a written report will be prepared,
reviewed by the CIA and distributed as appropriate. Internal Audit reports will also be presented to
the Committee. LiveArgyll audit reports will also be presented to their Finance and Audit Sub-
Committee by the LiveArgyll General Manager. Any audit reports relating to social work services will
also be presented to the Argyll and Bute HSCP Audit and Risk Committee.
37. The internal audit report will include management's response and corrective action taken or to be
taken in regard to the specific issues and risks. Management's response should include a timetable
for anticipated completion of action to be taken and an explanation for any corrective action that
will not be implemented.
38. Internal Audit will be responsible for appropriate follow-up on engagement findings and actions. All
findings will remain open until appropriate action is demonstrably taken by management or the risk
of no action is formally accepted.
Periodic Assessment
39. Internal Audit is subject to a Quality Assurance and Improvement Programme that covers all aspects
of Internal Audit activity. This consists of an internal annual self-assessment of the service and its
compliance with the Standards and ongoing performance monitoring. The adequacy of Internal
Audit is also assessed on an annual basis by the Council’s external auditors.  
40. External assessments against the Standards will be conducted at least once every five years by a
suitably qualified, independent assessor. These reviews form part of a national peer review
programme administered by the Scottish Local Authorities Chief Internal Auditor Group. 
41. The conclusions of all internal and external assessments will be reported to the Committee. 
Approval
42. This Charter was reported to and approved by the Committee at its meeting on 16 March 2023 and
shall be subject to regular review by the CIA and the Committee. 
Page 196

Page 197

Argyll and Bute Council
Internal Audit Manual
March 2023 
Page 197

Page 198

2 
Contents
Introduction ....................................................................................................................................... 4
Internal Audit Mission (PSIAS Section 3) ............................................................................................. 4
Definition of Internal Auditing (PSIAS Section 4).................................................................................. 4
Ethics (PSIAS Section 6) ...................................................................................................................... 4
Overview ........................................................................................................................................ 4
Applicability and Enforcement ......................................................................................................... 4
Relevant Codes ............................................................................................................................... 5
Integrity ......................................................................................................................................... 5
Objectivity ...................................................................................................................................... 5
Confidentiality ................................................................................................................................ 5
Competency ................................................................................................................................... 5
Principles of Public Life .................................................................................................................... 6
PSIAS Attributes ................................................................................................................................. 6
Internal Audit Charter (PSIAS 1000 - 1120)........................................................................................ 6
Proficiency (PSIAS 1210) .................................................................................................................. 6
Due Professional Care (PSIAS 1220) .................................................................................................. 7
Quality Assurance and Improvement Programme (PSIAS 1300).......................................................... 7
Requirements of the Quality Assurance and Improvement Programme (PSIAS 1310) .......................... 8
Internal Assessments (PSIAS 1311) ................................................................................................... 8
External Assessments (PSIAS 1312) .................................................................................................. 8
Reporting on the Quality Assurance and Improvement Programme (PSIAS 1320)................................ 9
International Standards for the Professional Practice of Internal Auditing’ (PSIAS 1321) ...................... 9
Disclosure of Non-conformance (PSIAS 1322) ................................................................................... 9
Performance ...................................................................................................................................... 9
Managing the Internal Audit Activity (PSIAS 2000) ............................................................................ 9
Planning (PSIAS 2010)...................................................................................................................... 9
Communication and Approval (PSIAS 2020) .....................................................................................10
Resource Management (PSIAS 2030) ...............................................................................................10
Policies and Procedures (PSIAS 2040) ..............................................................................................10
Coordination and Reliance (PSIAS 2050) ..........................................................................................10
Reporting to Senior Management and the Board (PSIAS 2060)..........................................................11
External Provider & Organisational Responsibility for Internal Auditing (PSIAS 2070) .........................11
Nature of the Work ...........................................................................................................................11
Governance (PSIAS 2110) ...............................................................................................................11
Page 198

Page 199

3 
Risk Management (PSIAS 2120).......................................................................................................11
Control (PSIAS 2130) ......................................................................................................................12
Engagement Planning ........................................................................................................................12
Engagement Objectives (PSIAS 2210) ..............................................................................................12
Engagement Scope (PSIAS 2220) .....................................................................................................13
Engagement Resource Allocation (PSIAS 2230) ................................................................................13
Engagement Work Programme (PSIAS 2240) ...................................................................................13
Performing the Engagement ..............................................................................................................14
Identifying Information (PSIAS 2310) ...............................................................................................14
Analysis and Evaluation (PSIAS 2320)...............................................................................................14
Documenting Information (PSIAS 2330) ...........................................................................................14
Engagement Supervision (PSIAS 2340).............................................................................................14
Communicating Results .....................................................................................................................14
Criteria for Communicating (PSIAS 2410) .........................................................................................15
Quality of Communications (PSIAS 2420) .........................................................................................15
Errors and Omissions (PSIAS 2421) ..................................................................................................15
Use of ‘Conducted in Conformance with the International Standards for the Professional Practice of
Internal Auditing’ (PSIAS 2430) .......................................................................................................15
Engagement Disclosure of Non-Conformance (PSIAS 2431) ..............................................................15
Disseminating Results (PSIAS 2440) .................................................................................................16
Overall Opinion (PSIAS 2450) ..........................................................................................................16
Monitoring Progress (PSIAS 2500) ......................................................................................................16 
Page 199

Page 200

4 
Introduction
1. The Local Authority Accounts (Scotland) Regulations 2014 introduced a requirement for all Scottish
Local Authorities to operate a professional and objective internal auditing service, which must be
delivered in accordance with recognised standards. The standards and practices applied in the UK
for all public sector internal audit providers, in-house, shared or outsourced, are the Public Sector
Internal Audit Standards (PSIAS), which came into effect in April 2013, and were updated in March
2017. 
2. This Internal Audit Manual (the Manual) has been created to provide guidance to the Internal Audit
section of Argyll and Bute Council (the Council) on the administration of the department and audit
approach to be adopted. The contents are guided by the requirement of PSIAS with the key sections
cross referenced to the appropriate section in PSIAS. 
Internal Audit Mission (PSIAS Section 3)
3. It is Internal Audit’s mission to enhance and protect organisational value by providing risk-based and
objective assurance, advice and insight.
Definition of Internal Auditing (PSIAS Section 4)
4. Internal auditing is an independent, objective assurance and consulting activity designed to add
value and improve the Council’s operations. It helps the Council accomplish its objectives by
bringing a systematic, disciplined approach to evaluate and improve the effectiveness of risk
management, control and governance processes.
Ethics (PSIAS Section 6)
Overview
5. The purpose of a ‘Code of Ethics’ is to promote an ethical culture within the profession of internal
auditing.  A code of ethics is necessary and appropriate for the profession of internal auditing,
founded as it is on the trust placed in its objective assurance about risk management, governance
and control.  A ‘Code of Ethics’ extends beyond the definition of internal auditing to include two
essential components: 
 principles that are relevant to the profession and practice of internal auditing 
 rules of conduct that describe behaviour norms expected of internal auditors.  
Applicability and Enforcement 
6. A ‘Code of Ethics’ applies to all of those who are commissioned to provide internal audit services to
the Council.  Suspected or known breaches of the ‘Code of Ethics’ should be referred to at least one
of the following, as considered appropriate:
 Chief Internal Auditor (CIA)
 Executive Director (Kirsty Flanagan)  (Section 95 Officer)
 Executive Director (Douglas Hendry) (Monitoring Officer)
 Audit and Scrutiny Committee (the Committee). 
7. The fact that a particular piece of ‘behaviour’ which has been identified as being possibly
inappropriate is not specifically covered by, or mentioned within, the Council’s own ‘Code of
Conduct’, does not necessarily prevent it from being unacceptable, discreditable or indeed
unprofessional.  
Page 200

Page 201

5 
8. For members of the Chartered Institute of Internal Auditors, breaches of the ‘Code of Ethics’ will be
evaluated and administered in line with the Institute’s disciplinary procedures.  If individual internal
auditors have membership of another professional body then he or she must also comply with the
relevant requirements of that organisation. Such procedures are without prejudice to the Council’s
own disciplinary procedures. All members of the internal audit team, on an annual basis, self-assess
their compliance with ethical principles and relevant Argyll and Bute Council policies by completing
a Fit and Proper form. This is submitted to the CIA.
Relevant Codes
9. Qualified internal auditors could be members of one or more of the following institutions: Chartered
Institute of Public Finance & Accountancy (CIPFA), the Chartered Institute of Management
Accountants (CIMA), the Chartered Institute of Internal Auditors (IIA) and the Association of
Chartered Certified Accountants (ACCA). Each of these bodies have their own Code of Ethics which
members are expected to comply with.  
Integrity
10. Internal auditors should:
 perform their work with honesty, diligence and responsibility
 observe the law and make disclosures expected by the law and the profession
 not knowingly be a party to any illegal activity nor engage in acts that are discreditable to the
profession of internal auditing or to the organisation
 respect and contribute to the legitimate and ethical objectives of the Council.
Objectivity
11. Internal auditors should:
 not take part in any activity or relationship that may impair or be presumed to impair their
unbiased assessment
 not accept anything that may impair or be presumed to impair their professional judgement
 disclose all material facts known to them that, if not disclosed, may distort the reporting or
activities under review.
Confidentiality
12. Internal auditors should:
 act prudently when using information acquired in the course of their duties and protect that
information
 not use information for any personal gain or in any manner that would be contrary to the law or
detrimental to the legitimate and ethical objectives of the Council.
Competency
13. Internal auditors should:
 only carry out services for which they have the necessary knowledge, skills and experience
 perform services in accordance with the International Standards for the Professional Practice of
Internal Auditing (as applied in the PSIAS)
 continually improve the proficiency and effectiveness and quality of their services, for example
through on going meetings and engagement with the CIA
Page 201

Page 202

6 
Principles of Public Life
14. In all dealings Internal Audit will adhere to Nolan’s seven principles of public life as set out in Exhibit
1. 
Exhibit 1– Nolan’s Seven Principles of Public life
Principle Description
Selflessness Holders of public office should take decisions solely in terms of the public interest.
Integrity Holders of public office should not place themselves under any financial or other
obligation to outside individuals or organisations that might influence them in the
performance of their official duties. They should not act or take decisions in order
to gain financial or other material benefits for themselves, their family, or their
friends.
Objectivity In carrying out public business, including making public appointments, awarding
contracts, or recommending individuals for rewards and benefits, holders of public
office should make choices impartially, fairly and on merit, using the best evidence
and without discrimination or bias.
Accountability Holders of public office are accountable for their decisions and actions to the public
and must submit themselves to whatever scrutiny is appropriate to their office.
Openness Holders of public office should be as open as possible about all the decisions and
actions that they take. They should give reasons for their decisions and restrict
information only when the wider public interest clearly demands.
Honesty Holders of public office have a duty to declare any private interests relating to their
public duties and to take steps to resolve any conflicts arising in a way that protects
the public interest.
Leadership Holders of public office should promote and support these principles by leadership
and example. 
PSIAS Attributes
Internal Audit Charter (PSIAS 1000 - 1120)
15. The Internal Audit Charter (the Charter), which has been agreed by the Committee, and is subject to
annual review and approval, provides the required information to comply with the PSIAS attributes
listed in Exhibit 2. As such this detail is not repeated in the Manual. The Manual will cover all other
requirements of PSIAS.   
Exhibit 2– PSIAS Attributes Detailed in the Internal Audit Charter
PSIAS
Reference
Attribute
PSIAS 1000 Purpose, Authority & Responsibility
PSIAS 1100 Independence & Objectivity
PSIAS 1110 Organisational Independence
PSIAS 1120 Individual Objectivity 
Proficiency (PSIAS 1210)
16. The Internal Audit team will work with proficiency and due professional care.  The CIA shall be a
CCAB accountant or CMIIA internal auditor with suitable experience.
17. The CIA is responsible for recruiting appropriate internal audit staff in accordance with the Council’s
recruitment processes. As part of the role the CIA shall:
Page 202

Page 203

7 
 ensure that internal audit collectively possess or obtain the skills, knowledge and other
competencies required to perform its responsibilities
 obtain competent advice and assistance where internal audit does not possess the skills,
knowledge and other competencies required to perform its responsibilities 
 ensure that internal auditors have sufficient knowledge to evaluate the risk of fraud and anti-
fraud arrangements in the organisation
 ensure that internal auditors have sufficient knowledge of key information technology risks and
controls
 ensure that internal auditors have sufficient knowledge of the appropriate computer-assisted
audit techniques that are available to them to perform their work.
Due Professional Care (PSIAS 1220)
18. In completing planning activities and subsequent audit work internal auditors shall consider the:
 extent of work needed to achieve the engagement’s objectives
 relative complexity, materiality or significance of matters to which assurance procedures are
applied
 adequacy and effectiveness of governance, risk management and control processes
 probability of significant errors, fraud, or non-compliance
 cost of assurance in relation to potential benefits.
19. In addition internal auditors exercise due professional care during a consulting engagement by
considering the:
 needs and expectations of clients, including the nature, timing and communication of
engagement results
 relative complexity and extent of work needed to achieve the engagement’s objectives
 cost of the consulting engagement in relation to potential benefits.
20. The CIA will ensure that regular conversations take place about performance, behaviours and
career/development aspirations in line with the Council’s new approach to the PRD process, this will
be undertaken on an annual basis.
Quality Assurance and Improvement Programme (PSIAS 1300)
21. The Institute of Internal Auditors (IIA) Practice Guide “Quality Assurance and Improvement
Programme” (QAIP) defines a quality assurance and improvement programme as:
“An ongoing and periodic assessment of the entire spectrum of audit and consulting work
performed by the internal audit activity. These ongoing and periodic assessments are composed of
rigorous, comprehensive processes; continuous supervision and testing of internal audit and
consulting work; and periodic validations of conformance with the Definition of Internal Auditing,
the Code of Ethics, and the Standards. This also includes ongoing measurement and analyses of
performance metrics (e.g. internal audit plan accomplishment, recommendations accepted and
customer satisfaction). If the assessments’ results indicate areas for improvement by the internal
audit activity, the chief audit executive will implement the improvements through the QAIP.”
Page 203

Page 204

8 
Requirements of the Quality Assurance and Improvement Programme (PSIAS 1310)
22. In accordance with the requirements of PSIAS the CIA has developed and maintains a QAIP that
covers all aspects of the internal audit activity and enables conformance with all aspects of the
PSIAS to be evaluated.
23. The QAIP assesses the efficiency and effectiveness of the internal audit activity and identifies
opportunities for improvement.  This assessment takes into account quality improvement from both
internal and external assessments.
Internal Assessments (PSIAS 1311)
24. At an audit activity level written policies and procedures, covering both technical and administrative
matters are formally documented to guide audit staff in consistent conformance with PSIAS and the
Code of Ethics. This is demonstrated by:
 an annual assessment is undertaken, which is reported to the Committee, in order to determine
the extent to which Internal Audit conforms to the Standards 
 maintenance of the Charter, setting out the purpose, authority and responsibility of Internal
Audit
 maintenance of the Manual, providing guidance on working practices.
25. Audit work conforms to written policies and procedures. This is demonstrated by:
 all audit working papers being subject to formal review by the CIA
 draft and final reports are checked and approved by the CIA and appropriate officers 
 this Manual setting out the various processes to ensure consistent conformance with PSIAS and
the Code of Ethics. 
26. Post-engagement client surveys to inform lessons learned, self-assessments, and other mechanisms
to support continuous improvement are completed. These are issued at the end of each audit
engagement with results acted upon and reported to the Committee.
External Assessments (PSIAS 1312)
27. The Scottish Local Authorities Chief Internal Auditors Group (SLACIAG) has developed a framework
for undertaking external assessments as follows:
 each local authority will be reviewed once every five years
 the SLACIAG Committee oversee the framework’s implementation and provide a level of scrutiny
and quality assurance to ensure the adequacy of the process and to arbitrate over any disputed
outcomes as required
 each authority is allocated another authority to assess 
 each Council’s CIA may appoint a team to undertake the assessment of the body to whom it has
been appointed, with the CIA being responsible for authorising the final report
 a qualified assessor, or assessment team, needs to demonstrate competence in two areas: the
professional practice of internal auditing; and the external assessment process, and it is for the
CIA of the body being assessed to determine whether the assessor or team is sufficiently
competent. Where a team is undertaking the inspection, these competencies must be held by
the team collectively and not necessarily by all individuals within the team.
Page 204

Page 205

9 
28. External assessors express an opinion on the entire spectrum of assurance and consulting work
performed (or that should have been performed) by the internal audit activity, including its
conformance with the Standards. Assessors also conclude on the efficiency and effectiveness of the
internal audit activity in carrying out its charter and meeting the expectations of stakeholders.
Reporting on the Quality Assurance and Improvement Programme (PSIAS 1320)
29. The CIA will report the results of the QAIP, via Committee papers, to the SMT and the Committee.
International Standards for the Professional Practice of Internal Auditing’ (PSIAS 1321)
30. The CIA shall only state that the internal audit activity conforms with PSIAS if the results of the QAIP
support this.
Disclosure of Non-conformance (PSIAS 1322)
31. The CIA shall report any instances of non-conformance with the PSIAS to the Committee and
consider including any significant deviations from the PSIAS in the governance statement where
there is evidence to support this.
Performance 
Managing the Internal Audit Activity (PSIAS 2000)
32. The work of Internal Audit is specified to deliver upon the requirements of the Annual Internal Audit
Plan in accordance with the Charter and this Manual.  
33. Internal audit activities are reviewed as part of the each audit assignment prior to the issuing of
reports.  This is to ensure that the work continues to reflect the definitions per the Charter and the
Manual.  The Manual in this iteration has been specified to reflect the requirements of the PSIAS
published in March 2017.
Planning (PSIAS 2010)
34. The Annual Internal Audit Plan is based on a documented risk assessment process.  The Internal
Audit plan will be developed based on a prioritisation of those key risks facing the Council including
input of the SMT and the Committee.  The plan will be flexible in nature, can be updated to reflect
the changing risks and priorities of the Council, and will take into account:
  the Council’s risk registers and risk management framework 
 a balance of coverage across all operational areas (this constitutes the assurance nature of the
plan ensuring an adequate level of internal audit review annually within each service)
 experience gained from previous Internal Audit activity 
 the impact of national issues (e.g. economic factors, the introduction of new legislation)
 the impact of local issues (e.g. corporate or service action plans) 
 periodic review of core financial and operational systems 
 the available audit resource and skills
 staff development and training 
 time needed for the management of the Internal Audit service 
 contingency set aside for consultancy, reviews or investigations
 liaison with other assurance providers such as the External Auditor and other scrutiny bodies.
Page 205

Page 206

10 
35. The risk based plan will include suitable flexibility to reflect the changing risks and priorities of the
organisation with this being kept under review by the CIA during the course of the year.  Such action
may be taken in response to changes in the Council’s business, risks, operations, programmes,
systems and controls.
36. Internal Audit may also provide consultancy work on the basis that it improves the management of
risks, adds value and improves the Council’s operations. A specific contingency will be made in the
internal audit plan to allow for management requests and consultancy work. The CIA will consider
the effect on the opinion work before accepting consultancy work or management requests over
and above the contingency allowed for in the internal audit plan. Such consultancy work will only be
undertaken where resources permit without impacting on the annual assurance process. In line with
the PSIAS, approval will be sought from the Committee before any significant unplanned
consultancy work is accepted. 
Communication and Approval (PSIAS 2020)
37. The CIA communicates the planned internal audit activities, along with the resource requirements
to the Committee for approval. Any significant revisions in the plan, resource limitations or
requirements for additional resources shall be communicated to the SMT and the Committee for
approval.
Resource Management (PSIAS 2030)
38. The CIPFA Local Government Application note for applying PSIAS states that ‘No formula exists that
can be applied to determine internal audit coverage needs. However, as a guide, the minimum level
of coverage is that required to give an annual evidence based opinion. Local factors within each
organisation will determine this minimum level of coverage’. 
39. It is the CIA’s responsibility to ensure that resourcing arrangements are in place to deliver the
annual risk based internal audit plan and that those resources are flexible enough to cope with
special requests. Where applicable the CIA may seek additional input from external providers.
40. The internal audit plan will document the budgeted resource requirements for the audit year. It will
also include a contingency to address unplanned work. Should circumstances arise during the year
that suggests that available resource levels will fall or appear to be falling below the level required
to deliver the plan, the CIA will communicate the impact of resource limitations and significant
interim changes to the Committee.
Policies and Procedures (PSIAS 2040)
41. This Manual serves as the Internal Audit’s policies and procedures.   The Manual is specifically
aligned to the provisions of the PSIAS and in complying with the Manual the team are
demonstrating compliance with the standards. The Manual is reviewed, and presented to the
Committee for approval, on an annual basis.  
Coordination and Reliance (PSIAS 2050)
42. The CIA is required to share information as appropriate with other providers of assurance and
consulting services to ensure proper coverage and minimise duplication of efforts.
43. In preparing the Internal Audit Annual Plan, the CIA shall seek to establish the extent to which
assurance can be placed on the work planned by external scrutiny bodies such as the Council’s
External Auditors, Audit Scotland and also any internal control reviews undertaken by local
management. This work informs our planned activities for the year with other sources of assurance
being used to inform the annual assurance statement as well as future audit planning. However, the
Page 206

Page 207

11 
CIA accepts their accountability and responsibility for ensuring adequate support for conclusions
and opinions reached by the assurance activity, no matter the source.
Reporting to Senior Management and the Board (PSIAS 2060)
44. The CIA shall prepare and present performance reports to each sitting of the Committee.    
Performance reports will capture the activities of Internal Audit relative to the plan.  
45. Ongoing reporting will also highlight specific issues as they relate to risk exposures, control issues,
fraud, governance or any other matters that the CIA deems appropriate for consideration by the
Committee.   Significant issues will also be captured within the annual internal audit report.
External Provider & Organisational Responsibility for Internal Auditing (PSIAS 2070)
46. Under any circumstances where an external internal audit service provider acts as the internal audit
activity, the provider shall ensure that the Council is aware that the responsibility for maintaining an
effective internal audit activity remains the responsibility of the Council. This is not applicable in the
financial year 2022/23.
Nature of the Work
47. Internal audit activity shall evaluate and contribute to the improvement of governance, risk
management and control processes using a systematic and disciplined approach as outlined in the
Charter.
48. Planned audit work includes consideration of a number of different types of audit assignments
including systems, regularity, performance, consultancy, risk and IT.  This varied application of audit
resources ensures that different aspects of Council business have been subjected to testing with
assurances being sought over a range of activities.  
Governance (PSIAS 2110)
49. The work of Internal Audit  will include reviews to improve the Council’s governance processes for:
 making strategic and operational decisions
 overseeing risk management and control
 promoting appropriate ethics and values within the Council
 ensuring effective organisational performance management and accountability
 communicating risk and control information to appropriate areas of the Council
 coordinating the activities of and communicating information among the Committee, external
and internal auditors, other assurance providers and management.
50. The work of Internal Audit shall also consider the design, implementation, and effectiveness of the
Council’s ethics-related objectives, programmes and activities and that the Council’s information
technology governance supports the organisation’s strategies and objectives.
Risk Management (PSIAS 2120)
51. The work of Internal Audit  shall evaluate the effectiveness of the Council’s risk management
processes by determining whether:
 organisational objectives support and align with the Council’s mission
 significant risks are identified and assessed
 appropriate risk responses are selected that align risks with the Council’s risk appetite
Page 207

Page 208

12 
 relevant risk information is captured and communicated in a timely manner across the Council,
thus enabling the staff, management and the board to carry out their responsibilities.
52. Internal Audit will evaluate the risk exposure relating to the Council’s governance, operations and
information systems regarding the:
 Achievement of the Council’s strategic objectives.
 reliability and integrity of financial and operational information
 effectiveness and efficiency of operations and programmes
 safeguarding of assets.
 Compliance with laws, regulations, policies, procedures and contracts.
53. The consideration of risk shall be included in all audit assignments including those consultancy
reports to ensure that they are consistent with the objectives of the engagement.
54. In completing audit assignments internal auditors shall also be alert to other significant risks and
note these accordingly – informing management of possible work outside the scope of the audit
where appropriate.
55. When assisting management in establishing or improving risk management processes, internal
auditors must refrain from managing risks themselves, which would in effect lead to them taking on
management responsibility, 
Control (PSIAS 2130)
56. The work of Internal Audit evaluates the adequacy and effectiveness of controls in the Council’s
governance, operations and information systems regarding the:
 achievement of the Council’s strategic objectives
 reliability and integrity of financial and operational information
 effectiveness and efficiency of operations and programmes
 safeguarding of assets
 compliance with laws, regulations, policies, procedures and contracts.
57. Internal auditors will utilise knowledge of controls gained during consulting engagements when
evaluating the organisation’s control processes.
Engagement Planning 
Engagement Objectives (PSIAS 2210)
58. Auditors are required to ensure that objectives have been agreed for each engagement.  Inherent in
this process is the need to carry out a preliminary risk assessment and a consideration of the
probability of the following, when developing the engagement objectives:
 significant errors
 fraud
 non-compliance
 any other risks
59. At the start of all engagements (including consulting engagements), a Terms of Reference document
showing the scope, objectives and associated risks of the review, plus anticipated timelines will be
Page 208

Page 209

13 
created. This will be agreed between the CIA and the Internal Audit team member assigned the
audit.  The Terms of Reference document will also be agreed by the appropriate Head of Service or
delegated audit contact.  
Engagement Scope (PSIAS 2220)
60. The scope of the audit work should be established so that it is sufficient to satisfy the engagement’s
objectives.  The engagement scope should consider the following relevant areas of the Council (this
should also consider relevant areas under the controls of outside parties): 
 systems
 records
 personnel
 physical properties.
61. Where significant consulting opportunities have arisen during an assurance engagement, a specific
written understanding as to the objectives, scope, respective responsibilities and other expectations
should be developed and agreed with the CIA.
62. It is accepted that not all areas of a process will be reviewed at each audit, which might include
geographical areas; the scope should be sufficient to satisfy the engagement objectives, but should
also state, where appropriate, which areas are not covered. 
63. For a consulting engagement, the scope of the engagement should be sufficient to address any
agreed-upon objectives.  If the internal auditors develop any reservations about the scope of a
consulting engagement while undertaking that engagement, they are required to discuss those
reservations with the relevant officer and the CIA to determine whether to continue with the
engagement.
64. During consulting engagements, internal auditors are required to address the controls that are
consistent with the objectives of those engagements.
Engagement Resource Allocation (PSIAS 2230)
65. The CIA is required to decide upon the appropriate and sufficient level of resources required to
achieve the objectives of the engagement based on the nature and complexity of each individual
engagement, time constraints and the resources available.
66. An initial consideration of the resources required is in the audit plan, but this should be reviewed
when the scope and objectives of the engagement are determined. 
Engagement Work Programme (PSIAS 2240)
67. The CIA has developed a template work programme which provides a clear link between the
programme and the agreed terms of reference and Internal Auditors should use this template for all
assignments. The template demonstrates how the work performed meets the agreed engagement
objectives.   
68. The work programme should be created by the internal audit team member assigned the audit, in
discussion with the CIA, and include procedures for identifying, analysing, evaluating and
documenting information. Work programmes for consulting engagements may vary in form and
content depending on the nature of the engagement. This will require the approval of the CIA. 
69. Work programmes must be approved by the CIA prior to implementation for each engagement and
amended as necessary.  
Page 209

Page 210

14 
Performing the Engagement
Identifying Information (PSIAS 2310)
70. Internal auditors are required to identify sufficient, reliable, relevant and useful information to
achieve each engagement’s objectives.
71. Sufficient information is factual, adequate and convincing so that a prudent, informed person would
reach the same conclusions as the auditor. Reliable information is the best attainable information
through the use of appropriate engagement techniques. Relevant information supports engagement
observations and recommendations and is consistent with the objectives for the engagement.
Useful information helps the organisation meet its goals. 
Analysis and Evaluation (PSIAS 2320)
72. When performing audits, internal auditors are required to base their conclusions and engagement
results on appropriate analysis and evaluation whilst remaining alert to the possibility of:
 intentional or unintentional wrongdoing
 errors and omissions
 poor value for money
 failure to comply with Council policy
 conflicts of interest.
Documenting Information (PSIAS 2330)
73. Internal auditors are required to document the relevant information required to support
engagement conclusions and results.  This includes the need to ensure that working papers are
sufficiently complete and detailed to enable another experienced internal auditor with no previous
connection with the audit to ascertain what work was performed, to re-perform it if necessary and
to support the conclusions reached.
74. Records management must be consistent with the Council’s overall document retention policy,
which is in turn consistent with the requirements of the Information Commissioner’s Office. Internal
Audit record keeping must also be consistent with the specific requirements of the area audited, for
example EU audits require documents to be kept for 7 years after the last payment has been made.    
75. Electronic engagement records are kept in a restricted folder and on Sharepoint. ICT are responsible
for the security controls, and the CIA is responsible for specifying who should have access to this.
76. The CIA shall obtain the approval of senior management and/or legal counsel as appropriate before
releasing any engagement records to external parties.
Engagement Supervision (PSIAS 2340)
77. All internal audit engagements shall be properly supervised to ensure that objectives are achieved,
quality is assured and that staff are developed.
78. Appropriate evidence of supervision and management review should be documented and retained
for each engagement.  
Communicating Results
79. Communicating the results of our internal audit work is a crucial aspect of the audit process and is
the key link to our stakeholders including the SMT, Heads of Service, Elected Members, the
Committee and (where appropriate) the public.  
Page 210

Page 211

15 
Criteria for Communicating (PSIAS 2410)
80. All audit reports are to be drafted using the template developed by the CIA. This template requires,
as a minimum, the overall audit opinion, executive summary, objectives and summary assessment,
detailed findings, and an action plan. Any deviation from the template report requires approval by
the CIA. 
81. Prior to issuing the draft report internal auditors are required to discuss the draft findings with the  
appropriate officers to confirm factual accuracy. This will generally be carried out at a clearance
meetings and a template has been created to facilitate and document that meeting. 
82. Where auditors make recommendations and include an action plan, such recommendations are
graded to allow the significance of findings to be ascertained.  
83. Action plans will include a management response that sets out the agreed action and timescales for
the completion of improvement actions. Internal Audit will enter the agreed actions and timescales
in the internal audit follow up database.  
84. Where there are any areas of disagreement between the internal auditors and management, which
cannot be resolved by discussion, such disagreements should be recorded in the action plan and the
residual risk highlighted. As all audit reports are reported to the Committee in their entirety this
disagreement will be reported to the Committee as and when the report is presented.  
85. In completing audit activities auditors are required to include and disclose all material facts
identified as part of their audit work and subsequent reports which, if not disclosed, could distort
their reports or conceal unlawful practice.  Such disclosures should be made with reference to
confidentiality requirements or other considerations that may preclude the release of information
into the public domain.
Quality of Communications (PSIAS 2420)
86. The work of Internal Audit should always seek to ensure that communications are accurate,
objective, clear, concise, constructive, complete, and timely.
Errors and Omissions (PSIAS 2421)
87. It is the CIA’s responsibility to ensure that where a final report contains a significant error or
omission, subsequent changes, revisions or corrections are communicated to all parties who
received the original communication.
Use of ‘Conducted in Conformance with the International Standards for the Professional
Practice of Internal Auditing’ (PSIAS 2430)
88. Internal Audit planning and the production of the audit reports will include reference to work being
carried out ‘in conformance with the PSIAS’.  Such disclosure requires underlying activities, such as
the results of any QAIP and an assessment of conformance with the Manual.  Such a statement can
only be made where there is work to support this disclosure.
Engagement Disclosure of Non-Conformance (PSIAS 2431)
89. Where any non-conformance with the PSIAS or Code of Ethics has impacted on a specific
engagement, the communication of the results should include the following disclosures:
 the principle(s) or rule(s) of conduct of the Code of Ethics or Standard(s) with which full
conformance was not achieved
 the reason(s) for non-conformance
 the impact of non-conformance on the engagement and the engagement results.
Page 211

Page 212

16 
Disseminating Results (PSIAS 2440)
90. The CIA is responsible for determining the circulation of audit reports within the Council.  This
circulation should be mindful of confidentiality or the possibility of other legislative requirements.
Standard practice is for the report to be issued to the:
 Chief Executive
 relevant Executive Director
 Head of Financial Services
 SMT Admin (for inclusion in SMT meeting)
 key audit contact
 external audit
 the Committee. 
91. The CIA shall determine whether there is any specific reason for the distribution list to be amended
for any specific report.  All audit reports are submitted in their entirety to the Committee which,
through the transparent provision of committee papers, makes them public documents. In the
event that the report contains sensitive information they may be restricted however this decision
will only be taken in consultation with senior management and legal counsel as appropriate. 
Overall Opinion (PSIAS 2450)
92. The CIA will deliver an annual internal audit opinion and report that can be used by the Council to
inform its governance statement.
93. The annual internal audit opinion must conclude on the overall adequacy and effectiveness of the
Council’s framework of governance, risk management and control and include a statement on
conformance with the PSIAS and the results of the QAIP.
Monitoring Progress (PSIAS 2500)
94. Internal Audit are responsible for following up on agreed action plans to ensure those actions are
properly implemented.  On a quarterly basis services are contacted and asked to provide an update
on progress against all open action plan points.  This is reported to the SMT on a quarterly basis and
as a standard agenda item to the Committee.  Where a service reports an action has been closed
Internal Audit ask for evidence to support that status. All action plan points will remain open until
appropriate action is demonstrably taken by management or the risk of no action is formally
accepted.
Page 212

Page 213

ARGYLL AND BUTE COUNCIL  AUDIT AND SCRUTINY COMMITTEE
FINANCIAL SERVICES  16 MARCH 2023 
SCRUTINY FRAMEWORK AND MANUAL ANNUAL REVIEW 
1. SUMMARY
1.1  This report concludes the annual review to determine whether any changes are
required to the Council’s Scrutiny Framework and Manual. 
2.  RECOMMENDATIONS 
2.1 To note the outcome of the annual review of the Scrutiny Framework and Manual
(Appendix 1 & Appendix 2). 
3.0  DETAIL
3.1 In March 2018 the Committee approved the Council’s Scrutiny Framework which
incorporated the scrutiny prioritisation process. In June 2018 the Committee
endorsed a Scrutiny Manual which provided more detailed guidance on how to carry
out a scrutiny review. 
3.2 In the five years since those two governance documents were approved we have
continued to evolve our approach to scrutiny as we have reflected on what works
well, where improvements can be made and alternative ways of performing scrutiny
in addition to the current Scrutiny Panel approach. 
3.3 In March 2020 the Committee considered a ‘Scrutiny- Lessons Learned’ report. The
‘Lessons Learned’ were those identified by: 
 Scrutiny Panel members
 Scrutiny Panel witnesses (both internal and external to the Council)
 the Chief Internal Auditor (CIA and scrutiny officers) 
3.4 The Lessons learned report also reflected on discussions that had been held during
Committees about whether there were different ways that the Committee could
perform scrutiny that would complement the Scrutiny Panel approach. For example
by inviting council officers to brief the Committees on topics of specific interest. 
3.5 In April 2021 a development session was held to discuss potential scrutiny topics
for review and consider amendments to the scrutiny process. 
3.6 The scrutiny topic identification, prioritisation and overall approach adopted at that
time was outlined to the Committee.  The Committee were asked to consider some
Page 213 Agenda Item 14

Page 214

key questions and the responses are summarised below: 
 There needs to be a degree of flexibility to change topics and to be able to
react quickly to an ever changing environment.
 It is for the Committee to determine scrutiny topics
 Depending on the number of emerging topics, the Committee may need to
meet more often, however these could be less formal and held virtually 
 An annual Scrutiny Plan is not required, topics should be allowed to emerge
 The prioritisation process is there as a tool if needed, but there is no need to
assess every scrutiny topic
 There has been value in having full panel meetings but these are resource
intensive and scrutiny lite should be adopted where appropriate.   
3.7 The Scrutiny Manual (Appendix 1) and Scrutiny Framework (Appendix 2) have been
reviewed and no substantial change is required at this time: 
3.8 Scrutiny Manual Changes 
Page Para Summary of Change Reason for Change  
No changes 
3.9 Scrutiny Framework Changes 
Page  Para Summary of change Reason for Change  
No changes 
4.0 CONCLUSION
4.1 The CIA has reviewed the Scrutiny Framework and Scrutiny Manual to determine
whether any changes were required from those approved in 2022. No substantial
changes were required. 
5 IMPLICATIONS  
5.1 Policy - None
5.2 Financial –None
5.3 Legal –None
5.4 HR – None
5.5 Fairer Scotland Duty – None
5.5.1 Equalities – None
5.5.2 Socio-Economic Duty – None
5.5.3 Islands Duty – None
5.6 Climate Change - None
5.7 Risk – None
5.8 Customer Service – None
Page 214

Page 215

For further information please contact Internal Audit (01546 604108)
Paul Macaskill 
Chief Internal Auditor
16 March 2023 
Appendices 
Appendix 1 - Scrutiny Manual
Appendix 2 - Scrutiny Framework 
Page 215

Page 216

This page is intentionally left blank

Page 217

Argyll and Bute Council
Scrutiny Manual
March 2023 
Page 217

Page 218

2 
Contents
Introduction .................................................................................................................................... 3
Scrutiny Reviews ............................................................................................................................. 3
Stage 1-2 – Scoping and Identifying Required Evidence............................................................... 4
Stage 3 – Evidence Gathering.......................................................................................................... 4
Written and Secondary Evidence...................................................................................................... 5
Oral Evidence.................................................................................................................................. 5
Council Officers/Elected Members Providing Evidence ...................................................................... 5
External Experts Proving Evidence.................................................................................................... 6
Stage 4-5 - Conclusions and Reporting .......................................................................................... 6
Appendix 1 – Guidelines for Officers Attending Scrutiny Committees ........................................ 8
Appendix 2 – Guidelines for External Experts Attending Scrutiny Committees ........................10 
Page 218

Page 219

3 
Introduction 
1. In March 2021 the Audit and Scrutiny Committee (the Committee) approved Argyll and Bute
Council’s (the Council) updated Scrutiny Framework (the Framework). This was first approved in
March 2018 and it establishes the framework for scrutiny within the Council. It is for the use of
anyone involved in the scrutiny process  including:
 members of the Audit and Scrutiny Committee 
 all elected members of the Council
 staff involved in the scrutiny process and those who may be required to provide evidence as
part of a scrutiny review
 members of the public, partners and external organisations who may be invited to provide
evidence as part of a scrutiny review.
2. The Framework sets out the process adopted to identify scrutiny topics and confirms that the Chief
Internal Auditor (CIA) will develop and maintain guidance on the performance of scrutiny reviews. 
This manual, first approved by the Committee in 2018 and last updated in March 2022, provides that
guidance and is designed to be a reference tool for officers carrying out scrutiny reviews, it is not
intended to be prescriptive, but to help ensure the scrutiny review process is a more structured and
informed one. 
Scrutiny Reviews 
3. Scrutiny reviews can be broken down into five stages as illustrated in exhibit 1.  The process is
cyclical as it can be necessary to revisit earlier steps as the review progresses. 
Exhibit 1 – Five Stages of a Scrutiny Review 

Page 219

Page 220

4 
Stage 1-2 – Scoping and Identifying Required Evidence
4. Initially the identified scrutiny topic may be quite loosely defined. If it is required to be assessed
against the prioritisation process defined in the Framework there may already have been a need for
it to be clarified. However, if chosen for scrutiny, further clarification may be required to help
determine a precise focus.  This should be carried out by the appointed scrutiny officer in
consultation with the topic proposer and the appropriate council service.
5. Once the topic is clearly defined the scope of the review should be determined. In particular we need
to establish the:
• purpose and objectives  
• specific areas to be covered and any exclusions  
• approach to be adopted 
• evidence required 
• people to be interviewed or invited to give evidence 
• anticipated outputs
• timescales. 
6. Defining the scope of the review will normally happen during an initial panel briefing meeting which
is attended by the three Scrutiny Panel members (a subset of the Audit and Scrutiny Committee), the
CIA and the appointed scrutiny officer.
7. That initial panel should also agree indicative timescales for panels to allow a provisional plan for the
key stages of the review to be created.
8. Once the Scrutiny Panel have agreed the scope and objectives they should be shared with all
members of the Audit and Scrutiny Committee. This will be done by e-mail as waiting for the next
meeting of the Committee might result in too much time elapsing.
Stage 3 – Evidence Gathering
9. When considering how the evidence is to be gathered it is important to remember there is no
definitive process.  Every scrutiny review will be different and there are a range of different
approaches that should be considered. These include:
• public meetings
• surveys
• workshops / focus groups
• site visits (internal and external)
• sourcing data and reports
• literature research
• SWOT/PESTLE analysis
• investigating good practice
• reviewing performance and financial data including trends and comparisons
• process mapping
• investigating potential collaborators and/or alternative suppliers
• interviewing experts 
• working with officers and elected members to research issues.
10. The evidence can be categorised as either ‘written and secondary evidence’ or ‘oral evidence’.
Page 220

Page 221

5 
Written and Secondary Evidence 
11. This includes: 
• written evidence from internal and external individuals and organisations
• notes taken by the scrutiny officer during interviews or site visits 
• existing council plans, policies, strategies, and reports relevant to the subject area 
• relevant national guidance, legislation and documentation 
• relevant guidance, good practice guides from national and regional bodies 
• good practice and innovative reports and plans from other councils. 
12. All written evidence considered as part of the review should be kept on file and retained in a manner
consistent with the requirements of the Council’s records management plan. These files be stored on
a SharePoint site managed by Scrutiny Officers.
Oral Evidence 
13. The gathering of written evidence may identify a benefit in inviting internal and external individuals
to provide oral evidence either to the scrutiny officer as part of the review, or directly to the
Committee at an informal and private meeting. The scrutiny process should be inclusive and ensure
that all those who wish to contribute whether as councillors, officers, external experts or members
of the public feel valued and are able to speak freely and openly.
14. It is important that, all internal and external individuals invited to give evidence, are:
• treated with courtesy and respect
• given ample notice of the time, date and place of meeting
• informed of the review scope 
• provided with questions, or the line of questioning, in advance with an explanation that this will
not be a restrictive list
• provided with copies of any relevant reports, papers and  background information
• given the opportunity to submit written evidence in advance of the meeting which is circulated
to Committee members
• given the opportunity to decline or to submit written evidence instead of appearing in person
• introduced to the Committee chair prior to the meeting commencing.
15. Minutes from any scrutiny panels should be circulated to scrutiny panel members, and any council
officer or external individuals that participated in the panel to enable them to comment on the
factual accuracy of the minute before they are finalised. When these are issued a timescale for
response should be provided with a statement that they will be accepted as correct if no response is
received by the stated timescale.
Council Officers/Elected Members Providing Evidence
16. Council officers invited to give evidence would normally be third tier managers or above (although
this could extend to other elected members).  The officers to be invited must be agreed with the
relevant member of the Council’s Senior Management Team and/or relevant Head of Service to
ensure they have the necessary knowledge of the topic. 
17. The evidence giving process must be seen as being supportive of scrutiny and not an opportunity to
be critical of any officer giving evidence. Questions asked of officers must be focused on reviewing
the policies and performance of the Council in relation to the topic being scrutinised.  Scrutiny should
Page 221

Page 222

6 
never be used to question the capability or competence of officers, or about matters of a disciplinary
nature, and questions should never be asked in a way that may be considered confrontational. 
18. ‘Guidelines for Officers Attending Scrutiny Committees’ are included at Appendix 1. A copy of these
guidelines should always be provided to officers prior to them attending meetings. 
External Experts Proving Evidence
19. External experts can be an essential part of undertaking a scrutiny review and their evidence can be
a valuable source of information.  Providing information to a scrutiny review or attending a scrutiny
committee may be a new experience to some and it should be remembered that external experts are
attending on a voluntary basis. It is incumbent on the scrutiny team and Committee members to
ensure their experience is positive and stress-free.  
20. External experts can be drawn from a wide range of individuals and organisations, for example:
• elected Members and officers from other councils 
• other external public sector bodies 
• voluntary sector organisations (local, regional and national) 
• professional associations
• trade unions
• private sector  
• user groups (local, regional and national) 
• community groups 
• experts in the subject area (academics, public or private sector managers). 
21. ‘Guidelines for External Experts Attending Scrutiny Committees’ are included at Appendix 2. A copy
of these guidelines should always be provided to witnesses prior to them attending meetings. 
Stage 4-5 - Conclusions and Reporting
22. At the end of a review a draft report should be produced which provides a full picture of the issues
under consideration and contains key findings and learning points. The report must be evidence
based and relate directly to the review scope. 
23. Learning points should focus on delivering improvements in service delivery, policy or strategic
direction. The scoping phase of the review will have identified the purpose and objectives of the
review and the final report should be closely aligned to those objectives.  A template for the report
has evolved as the scrutiny process has developed between 2018 and 2021 however we should
remain flexible about how we report on scrutiny work as there could be occasions where a different
approach might be beneficial. However, as a minimum, the output should include:
• executive summary
• introduction (including the background, scope and approach)
• findings
• learning points
• appendices (where required)
24. The draft report should be agreed with the Scrutiny Panel members before being discussed and
cleared with the relevant council officers at a meeting attended by the Chair of the Scrutiny Panel,
the CIA and possibly the appointed Scrutiny Officer.  
Page 222

Page 223

7 
25. Once the Scrutiny Panel are satisfied the report can be finalised and submitted to the next scheduled
Committee meeting for endorsement,  the Committee will also determine at this meeting which, if
any, of the other council committees the report should be submitted to for consideration.  
26. All scrutiny reports are submitted in their entirety to the Committee which, through the transparent
provision of committee papers, makes them public documents. In the event that the report contains
sensitive information they may be restricted however this decision will only be taken in consultation
with senior management and legal counsel as appropriate.  
Page 223

Page 224

8 
Appendix 1 – Guidelines for Officers Attending Scrutiny
Committees
Giving Evidence to the Audit & Scrutiny Committee – A Guide for Council Officers 
Introduction 
This document provides guidance to Council staff who have been asked to provide written or oral
evidence to the Audit and Scrutiny Committee (the Committee). Scrutiny is a key component of good
governance which helps the Council improve our decision making, policy development & implementation
and service delivery. 
What is the Committee?
The Committee is a cross-party committee made up of seven elected members, (four from the
opposition and three from the council administration) and an independent chair. This provides an
appropriate political spread within its membership however it is not a political committee and should
always conduct itself impartially. 
What does the Committee do?
The overall remit of the scrutiny element of the Committee is to ‘perform a scrutiny role through the
provision and delivery of scrutiny work focused on improving the performance of the Council.’ 
In summary it considers the performance of the Council, looking at the effectiveness of policies and
service delivery and identifies areas for improvement with, wherever possible, a key focus on outcomes
for the community rather than inputs. As such scrutiny adopts a ‘critical friend’ approach to help
promote continuous improvement.  The committee does not make policy and does not take decisions
about the operation of council services, but it may make recommendations to Council on policy matters.
Scrutiny Support 
The Committee is supported by the Chief Internal Auditor and staff from the internal audit section who
will be responsible for carrying out scrutiny reviews and drafting the scrutiny reports for the Committee. 
The Chief Internal Auditor is responsible for ensuring that officers giving evidence are given good
advance notice of any invitation to meet committee members, are properly briefed about the
arrangements for the meeting and receive adequate notice of the questions to be discussed at the
meeting. If you have any queries about scrutiny or your participation in it then please contact the Chief
Internal Auditor (audit.internal@argyll-bute.gov.uk)
Why have you been invited?
You have been asked to meet the Committee because you have knowledge or expertise that is relevant
to the topic being reviewed. The meeting also provides you with the opportunity to express your views
on any strengths, weaknesses and possible areas for improvement.
What are the arrangements for meeting members of the Committee?
You will be contacted by phone or e-mail by an officer supporting the committee.  The officer will
explain:
• why you have been invited
• background information about the committee
• background about the topic being investigated
Page 224

Page 225

9 
• arrangements for your attendance.
Approximately two weeks before the meeting, you will be sent key themes which will form the basis of
the discussion with the committee. This will allow you to come prepared and seek out any information
that you may need in advance. 
You should inform your line manager that you have been invited to the meeting. If you have any
problems or questions, please contact the Chief Internal Auditor.
Meeting location
Historically these meetings take place in one of the Council’s administrative buildings however the
impact of the COVID pandemic makes it more likely they will be virtual meetings. 
What happens at the meeting?
The meetings are informal and are conducted in an open and friendly manner and usually last no longer
than two hours. Officers who support the Committee and any independent external expert will also be
present. The Chair or nominated lead will open the meeting by welcoming and introducing those present
and outlining the process. The key themes will be discussed and you should be open and honest in your
responses and feel free to raise additional issues related to the topic.  
Please be aware that your participation in the process is very much seen as being supportive of scrutiny
and is appreciated by all the Committee members. The scrutiny process is designed to be inclusive and
ensure that all those who wish to contribute whether as councillors, officers, external experts or
members of the public feel valued and are able to speak freely and openly. It is not an opportunity for
Committee members to be critical of any officer giving evidence or to question the competence of any
officer. Questions will be focused on reviewing the policies and performance of the Council in relation to
the topic being scrutinised.  
Notes will be taken of the discussion at the meeting.  The meetings are held in private and notes of the
evidence will not become record until you have agreed to them. 
What happens after the meeting?
After the meeting, you will be sent a summary note of the discussion. You are entitled to make any
additions, deletions or amendments to this note and these should be highlighted and the document
returned. The note is confidential until it has been agreed by all witnesses. Once the Committee has
heard all the evidence, and drawn its conclusions and recommendations, a briefing or report will be
written and submitted to a formal meeting of the Committee. At this meeting the Committee will also
determine which of the other council committees the report should be submitted to for consideration. 
This could be to full Council, to the Policy & Resources Committee or to one of the service committees.
Scrutiny reports are submitted in their entirety to the Committee which, through the transparent
provision of committee papers, makes them public documents. In the event that the report contains
sensitive information they may be restricted. 
Page 225

Page 226

10 
Appendix 2 – Guidelines for External Experts Attending Scrutiny
Committees
Giving Evidence to the Audit & Scrutiny Committee – A Guide for External
Experts 
Introduction 
This document provides guidance to external witnesses who have been asked to provide written or oral
evidence to the Audit and Scrutiny Committee (the Committee). Scrutiny is a key component of good
governance which helps the Council improve its decision making, policy development & implementation
and service delivery. 
What is the Committee?
The Committee is a cross-party committee made up of seven elected members, (four from the
opposition and three from the council administration) and an independent chair. This provides an
appropriate political spread within its membership however it is not a political committee and should
always conduct itself impartially. 
What does the Committee do?
The overall remit of the scrutiny element of the Committee is to ‘perform a scrutiny role through the
provision and delivery of scrutiny work focused on improving the performance of the Council.’ 
In summary it considers the performance of the Council, looking at the effectiveness of policies and
service delivery and identifies areas for improvement with, wherever possible, a key focus on outcomes
for the community rather than inputs. As such scrutiny adopts a ‘critical friend’ approach to help
promote continuous improvement. 
The Committee does not make policy and does not take decisions about the operation of council
services, but it may make recommendations to Council on policy matters.
How does the Committee work?
The Committee collects evidence from a wide variety of sources including:
• written evidence from a range of internal and external individuals and organisations
• notes taken by the scrutiny team during interviews or site visits 
• existing council plans, policies, strategies, and reports relevant to the subject area 
• relevant national guidance, legislation and documentation 
• relevant guidance, good practice guides from national and regional bodies 
• good practice and innovative reports and plans from other councils. 
• questioning witnesses, experts and relevant community groups
• surveys and questionnaires.
Scrutiny Support 
The Committee is supported by the Chief Internal Auditor and staff from the internal audit section who
will be responsible for supporting scrutiny reviews and drafting the scrutiny reports for the Committee. 
Page 226

Page 227

11 
The Chief Internal Auditor is responsible for ensuring that external experts giving evidence are given
good advance notice of any invitation to meet committee members, are properly briefed about the
arrangements for the meeting and receive adequate notice of the themes to be discussed at the
meeting. If you have any queries about scrutiny or your participation in it then please contact the Chief
Internal Auditor (audit.internal@argyll-bute.gov.uk)
Why have you been invited?
You have been asked to meet the Committee because you have knowledge or expertise that is relevant
to the topic being reviewed. The meeting also provides you with the opportunity to express your views
on any strengths, weaknesses and possible areas for improvement.
What are the arrangements for meeting members of the Committee?
You will be contacted by phone or e-mail by an officer supporting the committee.  The officer will
explain:
• why you have been invited
• background information about the committee
• background about the topic being investigated
• arrangements for your attendance.
Approximately two weeks before the meeting, you will be sent key themes which will form the basis of
the discussion with the committee however the Committee may not restrict itself to these themes. This
will allow you to come prepared and seek out any information that you may need in advance. You are
welcome to send an initial written response to these themes before the meeting takes place however
this is entirely optional.  
Meeting location
Historically these meetings take place in one of the Council’s administrative buildings however the
impact of the COVID pandemic makes it more likely they will be virtual meetings. 
What happens at the meeting?
The meetings are informal and are conducted in an open and friendly manner and usually last no longer
than two hours. Officers who support the Committee and any internal or external experts may also be
present. The Chair or nominated lead will open the meeting by welcoming and introducing those present
and outlining the process. The key questions will be discussed, with supplementary questions being
asked where appropriate. The scrutiny process is designed to be inclusive and ensure that all those who
wish to contribute whether as councillors, officers, external experts or members of the public feel valued
and are able to speak freely and openly.
Notes will be taken of the discussion at the meeting.  The meetings are held in private and notes of the
evidence will not become record until you have agreed to them. 
What happens after the meeting?
After the meeting, you will be sent a summary note of the discussion. You are entitled to make any
additions, deletions or amendments to this note and these should be highlighted and the document
returned. The note is confidential until it has been agreed by all witnesses. Once the Committee has
heard all the evidence, and drawn its conclusions and recommendations, a briefing or report will be
written and submitted to a formal meeting of the Committee. At this meeting the Committee will also
determine which of the other council committees the report should be submitted to for consideration. 
This could be to full Council, to the Policy & Resources Committee or to one of the service committees.
Page 227

Page 228

12 
Scrutiny reports are submitted in their entirety to the Committee which, through the transparent
provision of committee papers, makes them public documents. In the event that the report contains
sensitive information they may be restricted.
Am I obliged to attend?
Whilst your participation in the process will be very much appreciated by all the Committee members
you are, of course, under no obligation to attend.   If you do not wish to be involved in the process or
would prefer to just submit written evidence rather than attending to give oral evidence then you are
perfectly entitled to make that choice.  
Expenses
As you have been invited to attend a meeting the Council would reimburse you for any reasonable
travelling expenses.   
Page 228

Page 229

Argyll and Bute Council
Scrutiny Framework
March 2023 
Page 229

Page 230

2 
Table of Contents 
Introduction................................................................................................................................. 3
What is Scrutiny? ......................................................................................................................... 3
Audit and Scrutiny Committee...................................................................................................... 4
Principles of Good Scrutiny........................................................................................................... 4
Scrutiny Support .......................................................................................................................... 4
Developing the Scrutiny Work Programme ................................................................................... 5
Scrutiny Reviews .......................................................................................................................... 5
Appendix 1 – Audit and Scrutiny Committee Terms of Reference (Scrutiny element only) .............. 6
Appendix 2 – Scrutiny Prioritisation Process Stages 1 and 2 ........................................................... 7
Appendix 3 – Scrutiny Prioritisation Process Stage 3 ..................................................................... 8 
Page 230

Page 231

3 
Introduction
1. The purpose of this document is to explain the framework for scrutiny at Argyll and Bute Council
(the Council). It is for the use of anyone who has any involvement in the scrutiny process 
including:
 members of the Audit and Scrutiny Committee 
 all elected members of the Council
 staff involved in the scrutiny process and those who may be required to provide evidence as
part of a scrutiny review
 members of the public, partners and external organisations who may be invited to provide
evidence as part of a scrutiny review.
2. In 2017 a decision was taken that the responsibility for the remit of scrutiny would move to a
newly established Audit and Scrutiny Committee. The Committee approved a new Scrutiny
Framework in March 2018 and this updated version was approved by the Committee in March
2022. 
What is Scrutiny?
3. Overview and scrutiny committees were established in England and Wales under the Local
Government Act 2000 to provide the opportunity for members of the Council to examine
services provided, ask questions on how decisions have been made and consider whether
service improvements can be delivered.  
4. In Scotland there is no requirement for scrutiny established by statute and consequently scrutiny
committees in Scotland have no prescribed powers. This contrasts with the position in England
and Wales where scrutiny committees have formal powers to require council officers and
elected members to give evidence, require information from the council and require a response
to any recommendation put to the council’s management team. 
5. Whilst there is useful guidance available there is no definitive view on what the role and
objectives of scrutiny are in Scotland. Consequently this provides the Council with the
opportunity to frame the delivery of governance in the way it feels is most beneficial. The
Council’s approach to scrutiny focuses on:
 reviewing the council’s effectiveness in achieving policy objectives
 assessing the impact of council policies
 making suggestions for improvement. 
6. As the primary focus of scrutiny is on council policy it is appropriate to provide a definition of
policy.  
'Policy – A policy is a formal, concise, accessible statement on how the council intends
to conduct business and deliver services. Generally it will be a statement of intent
with rules that influence and enable decision making. A policy statement will lessen
the risk of conflict and remove the opportunity for unfair selective application of
rules'.
Page 231

Page 232

4 
Audit and Scrutiny Committee 
7. The Council is made up of 36 elected members representing the 11 wards of Argyll and Bute.
Elected members play a key role in the Council through their involvement in full council
meetings and their representation on the Council’s strategic and area committees. A degree of
scrutiny is carried out at these committees through performance reporting, ongoing monitoring
of service delivery and the consideration of the conclusions from the Council’s Performance
Improvement Framework (PIF) which sets out the Council’s approach to continuous
improvement and the agreed mechanism for achieving best value across all services.  It is
therefore important that the Audit and Scrutiny Committee do not replicate any of the existing
scrutiny arrangements and focus its resources in an efficient manner which complements those
arrangements.   
8. In particular, when assessing potential topics for scrutiny, the Committee should ensure the
topic is not already being considered by an existing committee (area or strategic). The Audit and
Scrutiny Committee should not generally be seen as the first committee to contact in relation to
a topic meriting potential review nor should it be seen as a committee to deal with complaints. 
9. The Audit and Scrutiny Committee is a cross-party committee made up of seven elected
members, (four from the opposition and three from the council administration) and an
independent chair. This provides an appropriate political spread within its membership however
it should be stressed that it is not a political committee and should always conduct itself
impartially. 
10. The terms of reference for the scrutiny element of the Audit and Scrutiny Committee are
included in Appendix 3 to this framework however its overall remit is to ‘perform a scrutiny role
through the provision and delivery of scrutiny work focused on improving the performance of
the Council.’  The remit of the Audit and Scrutiny Committee would extend to those
organisations with whom the Council have entered into any form of formal agreement with for
the delivery of statutory services, this would include the Health & Social Care Partnership and
Live Argyll.  The Audit and Scrutiny Committee is required to meet at least four times every year.  
Principles of Good Scrutiny
11. To ensure scrutiny is effective the Centre for Public Scrutiny has put forward four key principles. 
They being that scrutiny should:
 provide a ‘critical friend’ challenge to the council, council officers and agencies
 reflect the voices and concerns of residents and communities
 drive improvement in the delivery of public services
 be delivered by independent minded members. 
12. These principles underpin the work of the Council’s Audit and Scrutiny Committee. 
Scrutiny Support
13. The Audit and Scrutiny Committee is supported by the Chief Internal Auditor and staff from the
internal audit section who will be responsible for carrying out scrutiny reviews and drafting the
scrutiny reports for the Committee. This ensures impartiality and access to appropriate skills and
experience to effectively investigate any aspect of council activity. 
Page 232

Page 233

5 
Developing the Scrutiny Work Programme
14. The Audit and Scrutiny Committee will identify topics for scrutiny whilst maintaining a degree of
flexibility to change these as new topics emerge in an ever changing environment.  As there is
only a finite amount of resource available to perform scrutiny a clear and transparent
prioritisation process has been adopted for assessing multiple potential topics to determine
those most likely to have a positive impact on council performance.   The prioritisation process
will only be required if there is insufficient resource to review all the topics identified by the
Committee or if there is any question over whether reviewing the topic would be of material
benefit.
15. Stage 1 asks five filtering questions to determine whether the topic passes to stage 2 or is
rejected at stage 1. Stage 2 is used to determine whether the topic should be considered as a
high or medium priority topic.  Appendix 2 illustrates the two stage process. 
16. Stage 3 of the prioritisation process applies a weighted scoring system to those topics that
successfully progressed from stages 1 and 2. The topic is assessed against eight criteria with
weighted scores allocated to each criteria. An overall score is then reached for the topic and this
allows the topics with the highest overall score to be prioritised.  The score allocated to each
criteria will require an appropriate balance of subjective and objective analysis. Appendix 3
illustrates stage 3 of the prioritisation process. There may be circumstances where there is an
emerging issue which cannot be fully assessed using the prioritisation process due to there being
a lack of supporting evidence.  In this circumstance the prioritisation process will still be
completed with the selected answers based on a realistic expectation rather than historic
evidence.  This provides scope for the Audit and Scrutiny Committee to determine whether a
topic should be scrutinised despite not being fully subject to the agreed process.
Scrutiny Reviews
17. Scrutiny reviews are carried out by the scrutiny officer who reports to the Chief Internal Auditor.
A review follows a five stage process as set out below:
 Stage 1 – Scoping
 Stage 2 – Identifying evidence required and key stakeholders
 Stage 3 – Evidence gathering
 Stage 4 – Conclusions and recommendations
 Stage 5 – Submission of final report 
18. Guidance on each of these stages will be developed and maintained by the Chief Internal
Auditor. 
19. Between 2018 and 2021 scrutiny activity has involved the ‘full panel’ approach which is
appropriate for large scale reviews however may be less appropriate if the Committee want to
review an emerging issue or where there may be an alternative way of performing scrutiny.
Consequently the scrutiny process has evolved to consider alternative ways to perform scrutiny
which complement the full panel approach. For example the Committee may wish to invite
officers to prepare a formal report or a presentation on a particular topic for Committee to
consider or invite them to attend a development session for a more informal discussion. 
Page 233

Page 234

6 
Appendix 1 – Audit and Scrutiny Committee Terms of Reference
(Scrutiny element only)
 To oversee and co-ordinate the scrutiny function including approval of the scrutiny
framework and associated policies or procedures.
 To scrutinise the performance of the Council in relation to the achievement of policy
objectives and performance targets in relation to all functions of the Council.
 To identify topics for scrutiny work in relation to the performance of the Council and
funded third party organisations. 
 To consider and make recommendations in respect of scrutiny reports brought to the
Committee for consideration.
 To monitor the implementation of scrutiny recommendations accepted by the Council.
 To provide an annual report to the Council on the work of the scrutiny function.
 To periodically review the scrutiny function to ensure it is operating effectively.
 To receive the Council performance report. 
Note that the responsibility for scrutiny at service committee level will be incorporated into the
service committee terms of reference.  
Page 234

Page 235

7 
Appendix 2 – Scrutiny Prioritisation Process Stages 1 and 2 
Page 235

Page 236

Appendix 3 – Scrutiny Prioritisation Process Stage 3 
TOPIC TITLE: Increasing recycling rates
SUBMITTED BY: AN Other
DATE OF SUBMISSION: 08 November 2017
STAGE 2 ASSESSMENT OUTCOME: Medium Priority
QUESTION OPTIONS SELECTION SCORE WEIGHTING TOTAL SCORE JUSTIFICATION FOR SELECTION
1
What is the current performance
based on the council's
performance scorecard?
> 10% under target
< 10% under target
< 10% over target
> 10% over target
Not applicable
< 10% over target 2 3 6
Business outcome BO24 - Waste is disposed of sustainbably  has two performance
measures. Reduction in waste to landfill of 21,500 and % of waste recycled,
composted and recovered of 40%.  Current performance is 9,932 and 49.3%.  This
means we are under target by 54% for target reduction but 23% over for % recycled.
As the focus of the topic is increasing recycling the Committee decided to focus on
the missed target for reduction.
2
To what extent does the issue
contribute to a business outcome
aligned to the Council's corporate
plan?
Major contribution
Significant contribution
Medium contribution
Slight contribution
No contribution
Medium
contribution 2 3 6
Whilst recycling is not specifically referenced in the corporate plan, business outcome
BO24 ' features in the Roads & Amenity Services service plan. The plan references one
of the challenges to the service as being 'Delivery of a revised waste strategy that is
affordable and compliant'
3 To what extent is this issue being
highlighted as a public concern?
Widespread
Significant
Medium
Slight
Not applicable
Slight 1 2 2
There has been a degree of interest and campaigning by local environmental groups
however this is not considered to be Council wide  and has been mainly isolated to
two ward areas.
4
What is the revenue budget
commitment to this area of
service?
>1m
500k-1m
250k-500k
100k-250k
>1m 4 3 12 Business outcome BO24 has an allocated revenue budget of £11.7m
5
In the past three years what is the
pattern of budget performance
for this area?
Major under/over spend
Significant over/under spend
Medium over/under spend
Slight over/under spend
Largely on budget
Slight
over/under
spend
1 2 2
Outurns in the previous three financial years  have been consistently over budget
however in none of these occasions has the budget been exceeded by more than
1.5%.
6 What is the status of national
legislation on the issue?
Failure to implement = penalties
Current legislation
Definite future legislation
Possible future legislation
Not applicable
Definite future
legislation 2 2 4
The service plan established that there is future legislation which will impact upon
the service however the full detail of that legislation is not currently clear. Discussion
with the Head of Service confirmed that it is likely to involve financial penalties if
recycling rates are missed.
7 How widespread is the impact of
the issue?
Council wide
Multiple wards
Single ward
Small no of residents
No impact
Council wide 4 1 4
For the council to meet future recyling targets our reduction in land fill will need to
be improved across all wards.  Simply focusing on one or two areas will not deliver
the required improvement in performance.
8
Does the issue feature in the
Council's risk management
registers?
Yes - red risk
Yes - amber risk
Yes - green risk
No
Yes - amber risk 3 3 9
The ORR for D&I includes the following which are relevant to recycling.
(RA06-01) Demand Risk - Failure to reduce environmental impact through
minimisation of waste to landfill and increasing recycling rates – risk score 8
(RA06-02) Demand Risk – Recycling targets increase – risk score 8
WEIGHTED TOTAL 45
HIGH / MEDIUM
FACTOR 1
TOTAL SCORE 45
Page 236

Page 237

ARGYLL AND BUTE COUNCIL  Audit and Scrutiny Committee
Legal and Regulatory Support  16 March 2023 
Regulation of Investigatory Powers (Scotland) Act 2000 (RIPSA) 
Annual report 
1.0 HEADLINES 
1.1 The Regulation of Investigatory Powers (Scotland) Act 2000 (RIPSA) places
a requirement on public authorities to authorise certain types of covert
surveillance during planned investigations.  
1.2 The Scottish Government Code of Practice on Covert Surveillance and
Property Interference requires an annual report on the use of RIPSA to be
reported to Members (‘the code of practice’) 
2.0 RECOMMENDATIONS 
2.1 The Audit and Scrutiny Committee consider and note the terms of the report.
3.0 DETAIL 
3.1 Regulation of Investigatory Powers (Scotland) Act 2000 places a
requirement on public authorities to authorise certain types of covert
surveillance during planned investigations. 
3.2 The Council has a policy and procedure in place that allows for
appropriate authorisation of requests for covert surveillance to be
considered/approved/refused and monitored through to completion.  
3.2 Between 1 January 2022 and 31 December 2022 the Council undertook no
covert surveillance operations. 
4.0 CONCLUSION 
4.1 The Council has met the requirements of the code of practice by providing
this report to Committee. 
Page 237 Agenda Item 15

Page 238

5.0 IMPLICATIONS 
5.1 Policy – None 
5.2 Financial – None 
5.3 Legal – None 
5.4 HR - None 
5.5 Fairer Duty Scotland – None 
5.5.1 Equalities – None 
5.5.2 Socio-Economic – None 
5.5.3 Islands – None 
5.6 Climate Change - None 
5.7 Risk – None 
5.8 Customer Service - None 
Douglas Hendry - Executive Director with responsibility for Legal and
Regulatory Support 
20 February 2023                                                  
For further information contact: Iain Jackson, Governance, Risk and Safety
Manager 01546 604188 
APPENDICES  
None 
Page 238

Page 239

Audit & Scrutiny Committee Work Plan 2022 – 2023 
This is an outline plan to facilitate forward planning of reports to the Audit & Scrutiny Committee 
Report  Lead Service Regularity
16 March 2023 Reports to Committee Services by 20 February 2023
Internal Audit and Counter Fraud Summary of Activities Chief Internal Auditor Quarterly
Internal Audit Report Follow Up Chief Internal Auditor Quarterly
Internal Audit Reports to Audit and Scrutiny Committee 2023/24 Chief Internal Auditor Quarterly
Internal Audit – External Quality Assessment Chief Internal Auditor Once every 5 years
Verbal Update by Chair(s) of Scrutiny Panel Chair and Vice Chair of Audit & Scrutiny
Committee  
Quarterly
RIPSA Annual Report Governance and Risk Manager Annual
Internal Audit 2023/24 Plan Chief Internal Auditor Annual
External Audit – 2022/23 Annual Plan Mazars Annual
2021/22 Unaudited Annual Accounts Preparation Plan and Timetable Head of Financial Services Annual
Treasury Management Strategy and Annual Investment Strategy Head of Financial Services Annual
Progress against Best Value Action Plan Update Chief Executive/Head of Customer Support
Services
Annual
Internal Audit Charter and Internal Audit Manual Chief Internal Auditor Annual
Scrutiny Manual and Framework Update Chief Internal Auditor Annual
15 June 2023 Reports to Committee Services by 22 May 2023
Internal Audit and Counter Fraud Summary of Activities Chief Internal Auditor Quarterly
Internal Audit Report Follow Up Chief Internal Auditor Quarterly
Internal Audit Reports to Audit and Scrutiny Committee 
 
Chief Internal Auditor Quarterly 
External Audit Update Report Mazars Quarterly
Page 239
Agenda Item
16

Page 240

Audit & Scrutiny Committee Work Plan 2022 – 2023 
Verbal Update by Chair(s) of Scrutiny Panel Chair and Vice Chair of Audit & Scrutiny
Committee  
Quarterly
Council Performance Report – October 2022 to March 2023  Head of Customer Support Services Bi-Annual
Audit Scotland Report – Financial Overview 2021/22 (Usually comes
in March – delayed in 2022)
Head of Financial Services Annual
Strategic Risk Register Update Chief Executive Annual
Internal Audit 2022/23 Annual Report  Chief Internal Auditor Annual
Review of Code of Corporate Governance Governance, Risk and Safety Manager Annual
External Audit 2022/23 Management Report Mazars Annual
Local Government Benchmarking Framework Report Head of Customer Support Services Annual
Unaudited Financial Accounts Head of Financial Services Annual
Local Government in Scotland:  Challenges and Performance 2023 Mazars Annual
XX September 2023 Reports to Committee Services by XX August 2023
Internal Audit and Counter Fraud Summary of Activities Chief Internal Auditor Quarterly
Internal Audit Report Follow Up Chief Internal Auditor Quarterly
Internal Audit Reports to Audit and Scrutiny Committee  Chief Internal Auditor Quarterly
External Audit Update Report Mazars Quarterly
Verbal Update by Chair(s) of Scrutiny Panel Chair and Vice Chair of Audit & Scrutiny
Committee  
Quarterly
PSIAS Self-Assessment  Chief Internal Auditor Annual
Local Government Benchmarking Framework Report Head of Customer Support Services Annual
Corporate Complaints Annual Report 2021/22  Governance, Risk and Safety Manager Annual
Freedom of Information Annual Report 2021/22  Governance, Risk and Safety Manager Annual
Audit & Scrutiny Committee 2021/22 Annual Report  Audit & Scrutiny Committee Chair Annual
Strategic Risk Register – Assurance Mapping Chief Internal Auditor Annual
Strategic Risk Register Update  Chief Executive Annual
Trust Fund Annual Accounts  External Audit Annual
Page 240

Page 241

Audit & Scrutiny Committee Work Plan 2022 – 2023 
Local Government in Scotland Overview 2022 Mazars Annual
Counter Fraud Annual Update (End of 2 year pilot) Chief Internal Auditor Annual
XX December 2023 Reports to Committee Services by XX November 2023
Internal Audit and Counter Fraud Summary of Activities Chief Internal Auditor Quarterly
Internal Audit Report Follow Up Chief Internal Auditor Quarterly
Internal Audit Reports to Audit and Scrutiny Committee 
 Early Years
 Heritage Assets 
Chief Internal Auditor Quarterly
External Audit Update Report Mazars Quarterly
Verbal Update by Chair(s) of Scrutiny Panel Chair and Vice Chair of Audit & Scrutiny
Committee  
Quarterly
Council 6-month Performance Report – April to September 2022 Chief Executive/Head of Customer Support
Services
Bi-Annual 
Page 241

Page 242

This page is intentionally left blank

Page 243

ARGYLL AND BUTE COUNCIL  AUDIT AND SCRUTINY COMMITTEE 
FINANCIAL SERVICES  16 MARCH 2023 
INTERNAL AUDIT REPORTS TO AUDIT AND SCRUTINY COMMITTEE 2022/2023 
1. EXECUTIVE SUMMARY 
1.1 There are four audits being reported to the Audit and Scrutiny Committee.     
1.2 The table below provides a summary of the conclusions for the audits performed.
The full reports are included as appendices to this report. 
Audit Name Level of
Assurance
High
Actions
Medium
Actions
Low
Actions
VFM
Actions
LiveArgyll Events
Management
High 0 0 0 0
Procurement High 0 0 0 0
Customer Service
Centre
High 1 0 5 1
Client Funds (Exempt) Limited 8 2 0 0 
1.3 Internal Audit provides a level of assurance upon completion of audit work. A
definition for each assurance level is documented in each audit report. 
2. RECOMMENDATIONS 
2.1 Audit and Scrutiny Committee to review and endorse this summary report and the
detail within each individual report. 
3.  DETAIL 
3.1 A high level summary of each completed audit report is noted below: 
Events Management: This audit has provided a high level of assurance. This
means that internal control, governance and the management of risk are at a high
standard. Only marginal elements of residual risk have been identified with these
either being accepted or dealt with.  A sound system of control designed to achieve
the system objectives is in place and being applied consistently. Procedures are
in place to manage events. The ‘Live Events and Shows Process’ document
outlines the process to be followed from the receipt of an enquiry to post event
activities. At each stage of the process the document identifies the staff team
responsible for each task. A number of standard template documents are available
to assist with the management of events and Eventbrite, an online ticket
management system is used to manage ticket sales. Controls are in place over
income and expenditure. A standard template is used for revenue projections and
income is projected for the following year based on the number of scheduled
events. Ongoing budget monitoring arrangements are part of the Service Level
Agreement with the Council. Events are actively promoted and marketed, with a
number of media resources being used, including Facebook, Instagram and
Page 243 Agenda Item 17a

Page 244

twitter. In addition to Social Media channels, various other media is used to
promote events. Controls are in place for risk management for events and the
Council, within the terms of the SLA provide LiveArgyll with health and safety
advice, training, audits and incident and near miss investigations. For major/one
off events the hirer must hold public liability insurance, this is checked by LiveArgyll
prior to the event. Exemptions to this would be private hires by individuals and
hires, which are community based, and do not involve a large number of
participants such as indoor bowling, tea dances, bridge clubs etc. Within the terms
of the SLA, the Council provides insurance cover. 
Procurement:  This audit has provided a high level of assurance. This means
that internal control, governance and the management of risk are at a high
standard. Only marginal elements of residual risk have been identified with these
either being accepted or dealt with.  A sound system of control designed to achieve
the system objectives is in place and being applied consistently.  A Procurement
Strategy and Sustainable Procurement Policy has been prepared, appropriately
approved and published on the Council’s website for 2022/25, it contains all of
the mandatory elements in compliance with the Procurement Reform (Scotland)
Act 2014 (The Act).  The Strategy also takes cognisance of Council documents
thus contributing towards achieving local and national outcomes.  Consultation
took place when developing the new strategy and changes were made as a
result.  Procurement officers are appropriately qualified and trained to carry out
their duties, additionally, training materials are available to officers across the
Council services who purchase goods and services as part of their duties.  The
Annual Procurement Report for 2021/22 was prepared, approved and published
as required by the Act.  Testing indicated that work is performed in compliance
with the Strategy and all figures reported in the annual report are accurate. 
Customer Service Centre: This audit has provided a high level of assurance.
This means that internal control, governance and the management of risk are
at a high standard. Only marginal elements of residual risk have been identified
with these either being accepted or dealt with. A sound system of control
designed to achieve the system objectives is in place and being applied
consistently. There are processes, systems and manuals in place for the
handling of customer contacts and enquiries. There would be benefit to updating
procedures to reflect current working practices. Performance standards are in
place, monitored and reported. There would be benefit to reviewing, with
Services some of the lagging indicators due to the limited availability of other
real time data. The Customer Service Standard Charter would benefit from a
review to reflect the updated performance standards. Customer contacts and
enquiries are handled in line with processes and procedures. Staff do not always
have up to date information resulting in transfers to Services to resolve. One
Service is not engaging appropriately despite the repeated requests from Senior
Managers to review and update information. Not all Services have access to the
Oracle CRM system used to record customer interactions.  An obstacle to
monitoring follow up is lack of integration between systems used by Services
and Oracle CRM. This means the digital functionality to fully test or establish
whether customer contacts and enquiries are followed up in a timely manner is
not currently available. The Council’s Customer Services Support Team which
includes the Customer Engagement Team (CET) have successfully retained its
Customer Service Excellence Accreditation, which is externally assessed. The
team were specifically praised for their commitment to a first class approach to
delivering customer focused services. 
Page 244

Page 245

Client Funds (Exempt) 
4. CONCLUSION 
4.1 Management has accepted each of the reports submitted and have agreed
responses and timescales in the respective action plans. 
5. IMPLICATIONS 
5.1 Policy - None
5.2 Financial - None
5.3 Legal - None
5.4 HR – None
5.5 Fairer Scotland Duty - None
5.5.1 Equalities – None
5.5.2 Socio-Economic Duty – None
5.5.3 Islands Duty – None
5.6 Climate Change – None 
5.7 Risk - None
5.8 Customer Service – None 
Paul Macaskill
Chief Internal Auditor
16 March 2023 
For further information contact: 
Paul Macaskill, Chief Internal Auditor
Tel:  01546 604108
Email: paul.macaskill@argyll-bute.gov.uk 
APPENDICES 
1. Events Management
2. Procurement
3. Customer Services Centre (To follow)
4. Client Funds 
Page 245

Page 246

This page is intentionally left blank

Page 247

LiveArgyll
Internal Audit Report
January 2023
FINAL 
High Medium Low VFM
Number of
Findings
0 0 0 0 
Events Management
Audit Opinion: High 
Page 247

Page 248

2 
LiveArgyll – Internal Audit Report – Events Management, January 2023 
Contents 
1. Executive Summary ........................................................................................................................ 3
Introduction ............................................................................................................................................ 3
Background ............................................................................................................................................. 3
Scope ....................................................................................................................................................... 4
Risks ........................................................................................................................................................ 4
Audit Opinion ......................................................................................................................................... 4
2. Objectives and Summary Assessment ........................................................................................... 4
3. Detailed Findings ............................................................................................................................ 5
Appendix 1 – Audit Opinion ................................................................................................................... 8 
Contact Details 
Internal Auditor: Moira Weatherstone
Telephone:  01546 604146 
e-mail:   moira.weatherstone@argyll-bute.gov.uk 
www.argyll-bute.gov.uk
Page 248

Page 249

3 
LiveArgyll – Internal Audit Report – Events Management, January 2023
1. Executive Summary
Introduction
1. As part of the 2022/23 internal audit plan, approved by the Audit & Scrutiny Committee in
March 2022, we have undertaken an audit of LiveArgyll’s system of internal control and
governance in relation to Events Management. 
2. The audit was conducted in accordance with the Public Sector Internal Audit Standards (PSIAS)
with our conclusions based on discussions with LiveArgyll officers and the information available
at the time the fieldwork was performed. The findings outlined in this report are only those
which have come to our attention during the course of our normal audit work and are not
necessarily all the issues which may exist. There are no agreed actions as a result of this report;
however it is the responsibility of management to determine the extent of the internal control
system appropriate to LiveArgyll. 
3. The contents of this report have been agreed with the appropriate LiveArgyll officers to confirm
factual accuracy and appreciation is due for the cooperation and assistance received from all
officers over the course of the audit.
Background
4. LiveArgyll was established by the Council and is a company limited by guarantee, governed by its
articles of association. This charitable company (charity number SC047545) is fully incorporated
and commenced trading on 2 October 2017. The Council provides support services to LiveArgyll
as outlined in the Service Level Agreement (SLA), this includes internal audit services to support
their governance framework. 
5. LiveArgyll is run by board members from the local community, there are 7 Trustees, all of whom
are volunteers and support the strategic direction and governance of the company led by the
General Manager. 
6. LiveArgyll are responsible for operating the Council’s leisure facilities, libraries, halls and
community centres. The Council continue retain ownership of the assets, however, the day-to-
day operations of the facilities is the responsibility of LiveArgyll. 
7. Events management within LiveArgyll can include weddings, conferences, charity events, parties
and organised concerts. Events mainly take place in the three halls - Coran Halls in Oban, the
Queens Hall in Dunoon or the Victoria Hall in Helensburgh. 
8. Events management is the process of planning and hosting large or small scale public or private
events either for social or business purposes.  The process of planning an event can include
budgeting, advertising, scheduling, catering, co-ordinating with 3rd parties, obtaining relevant
licences, risk assessments and health safety arrangements.    
Page 249

Page 250

4 
LiveArgyll – Internal Audit Report – Events Management, January 2023
Scope 
9. The scope of the audit was to assess procedures to manage events hosted in LiveArgyll venues
including controls over revenue, expenditure, risk management and insurance as outlined in the
Terms of Reference agreed with the Business Operations Manager on 12 December 2022.
Risks
10.  The risks considered throughout the audit were: 
 Strategic Risk - Reduced Income levels due to economic climate. Impact of Covid19 on
local economy and consequently levels of disposable income
 Strategic risk: Failure to effectively market and promote services
 Audit Risk 1 - failure to have event management processes in place
Audit Opinion
11. We provide an overall audit opinion for all the audits we conduct. This is based on our
judgement on the level of assurance which we can take over the established internal controls,
governance and management of risk as evidenced by our audit work.  Full details of the five
possible categories of audit opinion is provided in Appendix 1 to this report. 
12. Our overall audit opinion for this audit is that we can take a high level of assurance.  This means
that internal control, governance and the management of risk are at a high standard. Only
marginal elements of residual risk have been identified with these either being accepted or dealt
with. A sound system of control designed to achieve the system objectives is in place and being
applied consistently.
2. Objectives and Summary Assessment
13. Exhibit 1 sets out the control objectives identified during the planning phase of the audit and our
assessment against each objective.  
Exhibit 1 – Summary Assessment of Control Objectives 
Control Objective Link to Risk Assessment Summary Conclusion
1 Procedures are in
place to manage
events hosted in
LiveArgyll venues
Audit Risk 1 Substantial Procedures are in place to
manage events. The ‘Live Events
and Shows Process’ document
outlines the process to be
followed from the receipt of an
enquiry to hold an event to post
show activities. In addition,
numerous other operating
procedures and standard
documentation is in place to
assist with the running of events.
2 Controls are in place
over income and
expenditure with
budget monitoring
Strategic risk:
Reduced Income
levels due to
economic climate.
Substantial Income and expenditure are
projected in advance of an
event, with a post event review
being undertaken looking at
Page 250

Page 251

5 
LiveArgyll – Internal Audit Report – Events Management, January 2023
processes
established
Impact of Covid19
on local economy
and consequently
levels of disposable
income
projected figures against actual. 
The Council as required by the
SLA, with meetings being held
between the Council and
LiveArgyll, supports ongoing
budget monitoring.
3 Events are actively
promoted and
marketed
Strategic risk:
Failure to effectively
market and
promote services
Substantial Events are actively promoted
and marketed through a variety
of media with the marketing
team closely monitoring ticket
sales and where necessary
looking for additional avenues to
promote a particular event.
4 Controls are in place
for risk
management for
events and relevant
insurances are in
place
Audit Risk 1 Substantial Controls are in place to assess
the risks for each event with
standard risk assessment
templates available to complete. 
The Council, in line with the
Service Level Agreement (SLA)
provide Health & Safety (H&S)
advice and support to LiveArgyll. 
Over and above the insurance
provided by the Council, in line
with the SLA, commercial event
organisers must show proof of a
minimum of £5m insurance
cover.   
14. Further details of our conclusions against each control objective can be found in Section 3 of this
report.  
3. Detailed Findings
Procedures are in place to manage events hosted in LiveArgyll venues
15. Events within LiveArgyll can include weddings, conferences, charity events, parties and
organised concerts, events mainly taking place in the Coran Halls in Oban, the Queens Hall in
Dunoon or the Victoria Hall in Helensburgh. 
16. Procedures are in place to manage events. The ‘Live Events and Shows Process’ document
outlines the process to be followed from the receipt of an enquiry to post event activities. At
each stage of the process the document identifies the staff team responsible for each task. 
17. A number of standard template documents are available and in use including: 
 venue Hire Terms and Conditions;
 staff Pre-event Briefing Form for staff to communicate key points of the Event Risk
Assessment and pre-event checklist;
Page 251

Page 252

6 
LiveArgyll – Internal Audit Report – Events Management, January 2023
 security Pre-Event Briefing checklist to meet the Head External Stewards for event
briefing to communicate key points of the Event Risk Assessment, ensuring there is
adequate stewards to meet the risk assessment requirements;
 post Show Report check list;
 standard Operating Procedures. 
18. LiveArgyll use Eventbrite, an online ticket management system to manage ticket sales. The
Eventbrite – document ‘Events Payment Process’ outlines the various steps to be followed to
manage income from ticket sales.
Controls are in place over income and expenditure with budget monitoring processes
established
19. Controls are in place over income and expenditure. A standard template is used for revenue
projections and income is projected for the following year based on the number of scheduled
events. Expenditure projections are calculated in advance of each event.  The costs included in
the projections are the ‘additional’ costs the event incurs rather than a ‘full absorption costing’
approach.   
20. Ongoing budget monitoring arrangements are part of the Service Level Agreement with the
Council.  LiveArgyll and Council finance staff hold monitoring meetings, looking at all budgets
across LiveArgyll.  In 2021/22, an audit of Budget Monitoring was undertaken and provided a
high level of assurance.
Events are actively promoted and marketed 
21. Events are actively promoted and marketed, with a number of media resources being used,
including Facebook, Instagram and twitter. In addition to Social Media channels, various other
media is used to promote events, including: 
 LiveArgyll website; 
 partnership working with Wild about Argyll;
 AITC partnership as well as other stakeholders;
 The List website;
 What’s on and local papers; 
 member newsletters;
 TV screens in facilities;
 partnership working with Dunoon Cinema where members get discount as part of a joint
promotion; 
 digital screens and push notifications. 
22. An advertising pack to promote venues within LiveArgyll is available. This provides information
on what LiveArgyll offers in terms of events hosted in their venues, including information on
promotional opportunities. 
23. The Commercial/Marketing Team have responsibilities outlined in the Live Events and Shows
Process document, including: 
Page 252

Page 253

7 
LiveArgyll – Internal Audit Report – Events Management, January 2023
• checking the event spreadsheet on a weekly basis to ensure that all marketing materials
have been sent by promoters;
 contacting promoters where events may need some additional marketing to discuss
options on how to increase interest in their event and the potential costs. 
Controls are in place for risk management for events and relevant insurances are in place
24. The Council, within the terms of the SLA provide LiveArgyll with health and safety advice,
training, audits and incident and near miss investigations in order to help ensure that the
appropriate corporate health and safety arrangements are in place and properly complied with
on a comparable basis to similar services currently provided to the Council's directorates and
services. The Council’s Health & Safety team undertake internal audits of one facility each year
and this includes looking at any event risk assessments.  LiveArgyll completes a standard risk
assessment template prior to events taking place. 
25. The hirer is responsible for securing any permits required for the performances of copyright
work unless specified in booking agreement.  LiveArgyll check this prior to the event. 
26. For major/one off events the hirer must hold public liability insurance with a minimum
indemnity of £5 million, this is checked by LiveArgyll prior to the event. Exemptions to this would
be private hires by individuals e.g. wedding receptions and birthday parties and hires which are
community based and do not involve a large number of participants such as indoor bowling, tea
dances, bridge clubs etc. Within the terms of the SLA, the Council provides insurance cover. 
Page 253

Page 254

Appendix 1 – Audit Opinion 
Level of Assurance  Definition 
High  Internal control, governance and the management of risk are at a high standard. Only marginal elements of residual risk have
been identified with these either being accepted or dealt with. A sound system of control designed to achieve the system
objectives is in place and being applied consistently.
Substantial  Internal control, governance and the management of risk is sound. However, there are minor areas of weakness which put some
system objectives at risk and specific elements of residual risk that are slightly above an acceptable level and need to be
addressed within a reasonable timescale.
Reasonable  Internal control, governance and the management of risk are broadly reliable. However, whilst not displaying a general trend,
there are areas of concern which have been identified where elements of residual risk or weakness may put some of the system
objectives at risk.
Limited 
Internal control, governance and the management of risk are displaying a general trend of unacceptable residual risk above an
acceptable level and placing system objectives are at risk. Weakness must be addressed with a reasonable timescale with
management allocating appropriate resources to the issues raised. 
No Assurance  Internal control, governance and the management of risk is poor. Significant residual risk and/or significant non-compliance with
basic controls exists leaving the system open to error, loss or abuse. Residual risk must be addressed immediately with
management allocating appropriate resources to the issues. 
Page 254

Page 255

Argyll and Bute Council
Internal Audit Report
February 2020
FINAL 
High Medium Low VFM
Number of
Findings
0 0 0 0 
Procurement Strategy
Audit Opinion: High
Page 255

Page 256

2 
Argyll and Bute Council – Internal Audit Report – Procurement Strategy, February 2023 
Contents 
1. Executive Summary ........................................................................................................................ 3
Introduction ............................................................................................................................................ 3
Background ............................................................................................................................................. 3
Scope ....................................................................................................................................................... 4
Risks ........................................................................................................................................................ 4
Audit Opinion ......................................................................................................................................... 4
Recommendations ................................................................................................................................. 4
2. Objectives and Summary Assessment ........................................................................................... 5
3. Detailed Findings ............................................................................................................................ 6
Appendix 1 – Audit Opinion ................................................................................................................. 11 
Contact Details 
Internal Auditor: Mhairi Weldon 
Telephone:  01546 604294 
e-mail:   Mhairi.weldon@argyll-bute.gov.uk 
www.argyll-bute.gov.uk
Page 256

Page 257

3 
Argyll and Bute Council – Internal Audit Report – Procurement Strategy, February 2023
1. Executive Summary
Introduction
1. As part of the 2022/23 internal audit plan, approved by the Audit & Scrutiny Committee in
March 2022, we have undertaken an audit of Argyll and Bute Council’s (the Council) system of
internal control and governance in relation to the Procurement Strategy.
2. The audit was conducted in accordance with the Public Sector Internal Audit Standards (PSIAS)
with our conclusions based on discussions with council officers and the information available at
the time the fieldwork was performed. The findings outlined in this report are only those which
have come to our attention during the course of our normal audit work and are not necessarily
all the issues which may exist. We have not identified any actions to strengthen internal control,
however, it is the responsibility of management to determine the extent of the internal control
system appropriate to the Council.
3. The contents of this report have been agreed with the appropriate council officers to confirm
factual accuracy and appreciation is due for the cooperation and assistance received from all
officers over the course of the audit.
Background
4. Good procurement is vitally important to public services, businesses and communities to enable
delivery of sustainable economic growth and achieve strategic objectives.  
5. Scottish Government is responsible for developing public procurement policy and legislation in
Scotland, as well as setting up contracts and framework agreements for themselves and the
wider public sector.  In partnership with Scottish Government, Scottish public sector
organisations work together to ensure public procurement is subject to continuous
improvement and delivers value for money.  
6. Legislation governs how Scottish public bodies, including the Scottish Government, buy their
goods, services and works.  The Procurement Reform (Scotland) Act 2014 (The Act) built on the
work achieved in the previous reform of public procurement following the 2006 McClelland
review, providing direction to public bodies and setting out procurement responsibilities and
accountabilities.  The Act applies consistent rules to public contracts, therefore simplifying and
streamlining the procurement process for contracting authorities.
7. Alongside the Act are regulations to ensure that public purchases are made in a transparent and
fair manner.  This is to achieve efficiency in public spending while facilitating the participations
of small and medium-sized enterprises (SMEs), third sector bodies and supported businesses. 
These regulations are:
 The Public Contracts (Scotland) Regulations 2015
 The Public Procurement etc. (EU Exit) (Scotland) (Amendment) Regulations 2020
 The Utilities Contracts (Scotland) Regulations 2016
 The Concessions Contracts (Scotland) Regulations 2016
 The Procurement (Scotland) Regulations 2016
8. The Act requires all contracting authorities with significant procurement expenditure in the next
financial year to publish a procurement strategy setting out how they intend to carry out
Page 257

Page 258

4 
Argyll and Bute Council – Internal Audit Report – Procurement Strategy, February 2023
regulated procurements, or review the current strategy and make appropriate revisions.  This
strategy sets out how the Council intends to ensure that its procurement activity complies with
legislation and Council plans and policies, achieves value for money and contributes towards
both national and local outcomes and improvements.
9. The Act further requires all contracting authorities obliged to publish a Procurement Strategy,
and also publish an Annual Procurement Report indicating its performance as soon as
reasonably practicable after the end of its financial year.
10. The Council’s Procurement Strategy and Annual Procurement Report is prepared by the
Procurement, Commercial and Contract Management Team (PCCMT) who work with the council
services and suppliers to develop contracts and procedures that deliver best Value.  The team is
responsible for the purchasing of goods and services for all council departments and developing
procurement processes, procedures, strategies and policies in line with national best practice.
Scope 
11. The scope of the audit was to review process in place in terms of the procurement strategy and
annual procurement report to ensure compliance with statutory requirements as outlined in the
Terms of Reference agreed with the Head of Legal and Regulatory Services on 5 September
2022. 
Risks
12.  The risks considered throughout the audit were:
 Audit Risk 1: Failure to comply with legislative and regulatory requirements
 Audit Risk 2: Failure to comply with Council Standing Orders, policies and procedures 
 Audit Risk 3: Published annual performance information is inaccurate or incomplete 
Audit Opinion
13. We provide an overall audit opinion for all the audits we conduct. This is based on our
judgement on the level of assurance which we can take over the established internal controls,
governance and management of risk as evidenced by our audit work.  Full details of the five
possible categories of audit opinion is provided in Appendix 1 to this report.
14. Our overall audit opinion for this audit is that we can take a high level of assurance.  This means
that internal control, governance and the management of risk are at a high standard.  Only
marginal elements of residual risk have been identified with these either being accepted or dealt
with.  A sound system of control designed to achieve the system objectives is in place and being
applied consistently.
Recommendations 
15. We have not identified any recommendations as a result of this audit.  
16. Full details of the audit findings can be found in Section 3 of this report.
Page 258

Page 259

5 
Argyll and Bute Council – Internal Audit Report – Procurement Strategy, February 2023
2. Objectives and Summary Assessment
17. Exhibit 1 sets out the control objectives identified during the planning phase of the audit and our
assessment against each objective. 
Exhibit 1 – Summary Assessment of Control Objectives 
Control Objective Link to Risk Assessment Summary Conclusion
1 The Council’s
Procurement
Strategy is
compliant with The
Procurement
Reform (Scotland)
Act 2014 and
associated
regulations.
Audit Risk 1  High A Procurement Strategy and
Sustainable Procurement Policy has
been prepared, appropriately approved
and published on the Council’s website
for the period 2022/25.  This Strategy
contains all of the mandatory elements
in compliance with the requirements of
the Act.  A sample of frameworks
belonging to other organisations and of
contracts entered into by the Council
were reviewed and found to conform
to the requirements of the Strategy
and therefore the Act. 
2 The Council’s
Procurement
Strategy is
compliant with the
Council’s policies,
plans, aims and
objectives.
Audit Risk 2 High The Strategy takes cognisance of the
content of Council documents and
contributes towards achieving local
and national outcomes.  Consultation
took place when developing the new
strategy and changes were made as a
result.  The PCCMT are appropriately
trained to undertake procurement
duties and those purchasing goods and
services in other business areas of the
Council have access to the
Procurement Manual, e-learning
resources and support from the
PCCMT.  
3 The Annual
Procurement Report
incorporates all of
the mandatory
statutory elements
and information
provided is
complete and
accurate.
Audit Risk 1
Audit Risk 2
Audit Risk 3
High The Annual Procurement Report
2021/22 was prepared and submitted
to senior management for review and
subsequently published.  The report
contains the necessary information in
compliance with the Act and statistics
reported were found to be an accurate
reflection of performance achieved. 
18. Further details of our conclusions against each control objective can be found in Section 3 of this
report.    
Page 259

Page 260

6 
Argyll and Bute Council – Internal Audit Report – Procurement Strategy, February 2023
3. Detailed Findings
The Council’s Procurement Strategy is compliant with The Procurement Reform (Scotland) Act
2014 and associated regulations 
19. A Procurement Strategy has been prepared for the period 2022/25, it was formally reviewed and
approved by the Policy and Resources Committee in December 2021 and by the full Council in
February 2022.  The Strategy was subsequently published on the Council’s website and Scottish
Government promptly notified of the publication and provided with a link to review the
contents.  
20. The mandatory elements as required by the Act are set out in a table within the Strategy and the
Council’s responses and associated strategy content detailed alongside.
21. The Strategy sets out how the Council intends to carry out regulated procurements in the
overview and is reinforced throughout the remainder of the document.  There is also provision
for an annual review to ensure alignment with broader priorities.
22. The Strategy states that the Council’s procurement spend was £140m during the year 2020/21,
contributing to an annual spend of £12.6b across the public sector in Scotland.  This would imply
that the Council is expected to spend in excess of the £5m threshold in regulated procurements
each year.
23. National and local policies and priorities are reflected throughout the strategy via reference to
the Council’s Corporate Plan and Outcome Improvement Plan which are directly linked to
National Policy Priorities.  Further outcomes are referenced throughout the strategy including
those related to food procurement, sustainability, equalities, best value and community benefit.
24. Value for Money (VFM) is a key strategic procurement objective and the term is referenced
throughout in support of the overarching aims of the strategy which are to: 
 support the Council achieve budget savings targets
 work closer with client department to better understand needs
 identify opportunities to reduce expenditure
 control demand
 improve process efficiencies and 
 to work more collaboratively with other public sector organisations to support
community wealth building across the Council area.  
25. The requirement for equalities and diversity including fair work first principles and practices are
referenced throughout the strategy with links provided to the relevant legislation.  This helps to
ensure there is no intentional discrimination against specific groups of people when undertaking
procurements.
26. Transparency is achieved through compliance with the Council’s standing orders, the Act and
other statutory guidance, the Strategy also explains that the Council engages with the Supplier
Development Programme to understand organisational needs and share the Council’s
procurement work plan.  Prior Information Notices (PINs) will be published on Public Contracts
Scotland for all regulated procurements throughout 2022-2025 and consideration is given within
the initial Commodity Sourcing Strategy to lotting all regulated contracts.
Page 260

Page 261

7 
Argyll and Bute Council – Internal Audit Report – Procurement Strategy, February 2023
27. The Council is committed to long-term economic, social and environmental sustainability which
is clearly evidenced throughout the Strategy and augmented in the appended Sustainable
Procurement Policy.
28. Community wealth building and community benefits are key aims within the Strategy.  The
requirement to achieve community benefits for all procurement exercises above £100k for
goods and services and £2m for works is acknowledged along with the associated reporting
requirements and links to further information.
29. The need for relevant and proportionate consulting and engagement with appropriate
stakeholder groups is noted within the Strategy.  The key stakeholder groups have been
identified along with the approval and publication requirements.   
30. Promotion of the living wage and wider fair work first practices is a strategic aim and is also
outlined within the table of mandatory requirements.  There is further acknowledgement of the
requirement throughout the Strategy and advises that further guidance can be obtained from
Scottish Government.  
31. Health and safety considerations within the workforce, for clients and throughout the supply-
chain are acknowledged and specifically referenced within the procurement principles and the
table of mandatory requirements along with the legislation that is required to be complied with. 
A link is also provided to the Council’s corporate health and safety policy.
32. Also included within the table of mandatory requirements and as a priority within the
Sustainable Procurement Policy is the need to source goods and services fairly and ethically. 
There is further acknowledgement of this throughout the Strategy and particular reference is
made to the completion of a Commodity Sourcing Strategy in preparation for a procurement
exercise which considers fair and ethical trade.  
33. Health, wellbeing and education of communities is implied throughout the Strategy and
specifically stated within the table of mandatory requirements where food procurement is
concerned.  The requirement to maintain animal welfare in the food supply chain is also
included in this table and within the appended sustainable procurement policy.
34. The Strategy states that prompt payment clauses requiring a 30 day payment term are
embedded within contractual terms and conditions and this should also apply to contractors
when paying sub-contractors who are delivering and supporting Council contracts.  This does not
extend to sub-contractors paying sub-contractors but this would be outwith the control of the
Council staff to monitor.  
35. The contract register published on the Council’s website shows that we also purchase from
contracts created by other organisations/collaborations such as Scotland Excel, Scottish
Government, NHS and other Local Authorities in Scotland.  A sample of four strategies prepared
by these other organisations was selected for review to ensure they were also compliant with
the Act.  All four were found to be largely compliant with only minor omissions noted.  All
Scottish public sector procurement strategies are reviewed by Scottish Government upon
publication and subsequently amended where necessary.  It is therefore appropriate for the
Council to purchase from the contract frameworks agreed by these organisations.
36. A sample of four recent contracts entered into by the Council were selected for review to
determine if they were compliant with the content of the Strategy and these were found to be
satisfactory.
Page 261

Page 262

8 
Argyll and Bute Council – Internal Audit Report – Procurement Strategy, February 2023
37. As part of their day to day work, the PCCMT will monitor off-contract spend and take action
where relevant.  Where purchases are found to be incorrectly recorded as non-contracted
spend, the records will be updated for future reference to show that such spend is in fact part of
a contract or framework.  Where significant spend with a non-contracted supplier is identified,
the PCCMT will contact the Council service responsible for the purchases and advise that a
contract should be put in place.  
38. Single source suppliers may be contracted using the “Justification for Non-Competitive Action”
(JNCA) process in accordance with supplementary guidance.  This guidance clearly states the
circumstances where competitive action may not be required and this includes where there is
only one possible supplier.  At the time of review, there were 168 JNCAs recorded for the year
2022/23 and each contained an appropriate reason for using this process, the most common
being due to single supplier, additional purchase from existing supplier for consistency or urgent
purchase.
39. The Strategy informs the reader that other relevant regulations should also be complied with
when undertaking procurement exercises.   
The Council’s Procurement Strategy is compliant with the Council’s policies, plans, aims and
objectives
40. The Strategy takes cognisance of the directions set out in formal Council documents including
the Council Constitution, Corporate Plan, Outcome Improvement Plan and Procurement Manual. 
Elements within these documents direct the reader to comply with content such as the financial
and security regulations and contract standing orders.
41. The six outcomes from the Outcome Improvement Plan are quoted within the Strategy including
detailed explanations of how the associated aims and objectives will be addressed.  An action
plan has been prepared with performance measures put in place to monitor progress.  
42. There is frequent reference to the community demonstrating a clear understanding of the
challenges faced across the Council area as well the benefits of being a rural authority.  The long-
term outcomes are addressed throughout the Strategy and acknowledgement is made of the
requirements for equality, engagement, supplier empowerment, resources, partnership working
and overarching governance frameworks.
43. Consultation on the revised Strategy took place in November 2021 and was open to all members
of the public to provide commentary.  The consultation report advised that a total of 47
responses were received from both the public and from Council employees resulting in some
changes being made to the Strategy prior to publication.
44. The Procurement Manual was last updated in August 2022 and is available to view on the
Council’s website.  The manual takes cognisance of the content of the Strategy in terms of
contributing to Council objectives, meeting best value requirements, compliance with relevant
legislation and ensuring that sustainability is considered at operational level when carrying out
procurement activity.  
45. The PCCMT consists of 18 members of staff, 12 of whom are members of professional bodies
and 4 studying towards membership.  The PCCMT have also completed a range of learning
modules delivered both in-house and externally to keep up to date with current practices and
ensure compliance with the legislative requirements as set out within the Strategy.  
Page 262

Page 263

9 
Argyll and Bute Council – Internal Audit Report – Procurement Strategy, February 2023
46. Council staff outwith the PCCMT who are required to purchase goods or services as part of their
duties have access to the Procurement Manual and a range of e-learning modules on the
Council’s e-Learning platform LEON.  These are comprehensive resources that carefully guide the
user through various stages of procurement.  Additional specific guidance is available on the
Council’s intranet site, the Hub, for members and employees and includes links to further
information.  The PCCMT can also be contacted to provide advice and support when required.
The Annual Procurement Report incorporates all of the mandatory statutory elements and
information provided is complete and accurate
47. The Annual Procurement Report for 2021/22 was submitted to both Department Management
Team and Executive Leadership Team in July 2022 prior to publishing on the Council’s website
for members of the public to view.  Scottish Government have been advised of this publication
and provided with a link to review the content.  
48. The report contains the necessary information to ensure compliance with the Act including:
 Summary of regulated procurements completed during 2021/22
 Review of compliance with 2021/22 Procurement Strategy
 Identifies areas for improvement
 Number of regulated procurements that did not comply with the Strategy (none)
 Number of community benefits achieved within contracts awarded (19)
 Summary of supported businesses including steps taken to facilitate their involvement
 Details on 57 regulated procurements expected to commence over the next two
financial years 
 Statistical analysis of procurement activity
49. The statistics provided in the executive summary of the annual report were reviewed and
verified using information extracted from the systems maintained by the PCCMT.  These are as
follows:
Executive Summary Statistics
£171.4m
Total Spend
£158.8m
Estimated Procurement-
related Spend
£144.5m
Contracted Spend
1635
Total Suppliers 
82,909
Invoices processed
£97,120
Average spend per supplier
1,305
SME Suppliers
£109.6m
SME Spend 
Summary of Regulated Procurements Completed 
Open
Procedure
(Single
Stage)
Restricted
Procedure
(Dual
Stage)
Quick
Quote
Framework/
Call-off/
Mini Comp
Light
Touch
Regime
Direct
Award
Total
Supplies 1 0 1 15 0 1 18
Services 5 1 0 6 9 3 24
Works 2 0 0 1 0 0 3
Total 8 1 1 22 9 4 45
Page 263

Page 264

10 
Argyll and Bute Council – Internal Audit Report – Procurement Strategy, February 2023 
Total estimated value of completed regulated procurements £38.4m
Total estimated procurement revenue savings to be delivered from the contracts
placed (identified at Contract Award)
£0.021m
Total estimated revenue procurement benefits to be delivered from the contracts
placed (identified at Contract Award)
£0.024m
Average number of bids received (for Open/Restricted) 4.9
% of contracts awarded to SMEs during the reporting period 75.6%
Average processing time for a procurement exercise (from procurement start date
to date of award) in weeks
19.5
Number of collaborative contracts let in cooperation with other organisations 22 
Page 264

Page 265

Appendix 1 – Audit Opinion 
Level of Assurance  Definition 
High 
Internal control, governance and the management of risk are at a high standard. Only marginal elements of residual risk have
been identified with these either being accepted or dealt with. A sound system of control designed to achieve the system
objectives is in place and being applied consistently. 
Substantial 
Internal control, governance and the management of risk is sound. However, there are minor areas of weakness which put some
system objectives at risk and specific elements of residual risk that are slightly above an acceptable level and need to be
addressed within a reasonable timescale. 
Reasonable 
Internal control, governance and the management of risk are broadly reliable. However, whilst not displaying a general trend,
there are areas of concern which have been identified where elements of residual risk or weakness may put some of the system
objectives at risk. 
Limited 
Internal control, governance and the management of risk are displaying a general trend of unacceptable residual risk above an
acceptable level and placing system objectives are at risk. Weakness must be addressed with a reasonable timescale with
management allocating appropriate resources to the issues raised. 
No Assurance 
Internal control, governance and the management of risk is poor. Significant residual risk and/or significant non-compliance with
basic controls exists leaving the system open to error, loss or abuse. Residual risk must be addressed immediately with
management allocating appropriate resources to the issues. 
Page 265

Page 266

This page is intentionally left blank

Page 267

Argyll and Bute Council
Internal Audit Report
February 2023
FINAL 
High Medium Low VFM
Number of
Findings
1 0 5 1 
Customer Service Centre
Audit Opinion: High 
Page 267

Page 268

2 
Argyll and Bute Council – Internal Audit Report – Customer Service Centre, February 2023
Contents 
1. Executive Summary ........................................................................................................................ 3
Introduction ............................................................................................................................................ 3
Background ............................................................................................................................................. 3
Scope ....................................................................................................................................................... 4
Risks ........................................................................................................................................................ 4
Audit Opinion ......................................................................................................................................... 4
Recommendations ................................................................................................................................. 5
2. Objectives and Summary Assessment ........................................................................................... 5
3. Detailed Findings ............................................................................................................................ 7
Appendix 1 – Action Plan ..................................................................................................................... 13
Appendix 2 – Audit Opinion ................................................................................................................. 18 
Contact Details 
Internal Auditor: Annemarie McLean 
Telephone:  01700 501354 
e-mail:   annemarie.mclean@argyll-bute.gov.uk 
www.argyll-bute.gov.uk
Page 268

Page 269

3 
Argyll and Bute Council – Internal Audit Report – Customer Service Centre, February 2023
1. Executive Summary
Introduction
1. As part of the 2022/23 internal audit plan, approved by the Audit & Scrutiny Committee in
March 2022, we have undertaken an audit of Argyll and Bute Council’s (the Council) system of
internal control and governance in relation to the Customer Service Centre.
2. The audit was conducted in accordance with the Public Sector Internal Audit Standards (PSIAS)
with our conclusions based on discussions with council officers and the information available at
the time the fieldwork was performed. The findings outlined in this report are only those which
have come to our attention during the course of our normal audit work and are not necessarily
all the issues which may exist. Appendix 1 to this report includes agreed actions to strengthen
internal control however it is the responsibility of management to determine the extent of the
internal control system appropriate to the Council.
3. The contents of this report have been agreed with the appropriate council officers to confirm
factual accuracy and appreciation is due for the cooperation and assistance received from all
officers over the course of the audit.
Background
4. Argyll and Bute Council (the Council) are committed to providing excellent customer service by
putting customers at the centre of its everyday business. Excellent customer service will enhance
the Council’s standing, allow ease of interaction and help resolve any issues quickly and
efficiently. Whilst poor customer service can have detrimental effect on the Council’s reputation
it can also drive down organisational efficiency and effectiveness, it is therefore important that
public bodies promote and maintain  good customer services with the public, thereby, reducing
costs by minimising the time needed for handling customer interactions and complaints. 
5. In 2010 the council launched its Customer Service Charter as part of a programme of activities
aimed at further improving customer service standards. The Charter tells customers the
standards of response they can expect depending on how they contact us. 
6. The Customer Engagement Team’s (CET) role is to handle initial customer enquiries and requests
for every council Service, via a wide range of channels. The CET aims to get every customer
enquiry 'right first time' without having to needlessly transfer the query to officers within
specific services. 
7. At the time of our review the CET have an annual budget of £1.42 million with 45 Full Time
Equivalent (FTE) staff spread between Web Team, Digital Services Team, Customer Service
Centre (CSC), Service Points and Registration. 
8. It is essential that the Council use all the tools available to help deliver the best quality of service
possible. The CET core systems include Oracle Customer Relationship Management (CRM) and
Netcall Converse Contact Management Systems plus subsidiary systems like room booking and
Facebook. 
Page 269

Page 270

4 
Argyll and Bute Council – Internal Audit Report – Customer Service Centre, February 2023
9. Customer Service Centre staff rely on services to provide them with sufficient information and
resources to allow them to handle enquiries effectively on their behalf. All enquiries that cannot
be resolved immediately are transferred to the service staff via email.   
10. Contact centre staff are primarily based in Campbeltown, however, Service Point staff are based
across the Council areas and use the same systems providing resilience and also assisting with
peaks in customer demand. In the year 2021/22 of the 563,467 total customer interactions,   
152, 272 were mediated interactions with staff split across the following channels:  
Telephone 111,726  2021/22 ALL TOTALS Total % Split
Face to face 11,797  Mediated Transactions 152,272 27%
Email  18,002  Automated Information
requests
296,736 53%
Letter 4,856  Automated Transactions 114,459 20%
Smart Assistant 3,156  TOTAL 563,467 
Facebook 381    
Text 558    
Webmail - Contact Us form 194    
Chat 1,077    
Voiceform 525    
TOTAL  152,272    
Scope 
11. The scope of the audit was to review the process and systems used for the handling of initial
customer contacts and ensure that customer enquiries are followed up in a timely manner, as
outlined in the Terms of Reference agreed with the Customer Engagement and Transformation
Manager on 13 January 2023. 
Risks
12.  The risks considered throughout the audit were:
 SRR05 - The Council fails to understand service user needs and emerging demographic
trends and does not align service delivery to meet these - Ineffective partnership
working
 SRR06 - Insufficient resources to ensure effective service delivery - Services fail to
achieve agreed performance levels and as a result are not contributing fully to Council
objectives
 Audit Risk 1: Failure to comply with established processes and procedures
 Audit Risk 2: Failure to manage customer expectations
Audit Opinion
13. We provide an overall audit opinion for all the audits we conduct. This is based on our
judgement on the level of assurance which we can take over the established internal controls,
governance and management of risk as evidenced by our audit work.  Full details of the five
possible categories of audit opinion is provided in Appendix 2 to this report. 
Page 270

Page 271

5 
Argyll and Bute Council – Internal Audit Report – Customer Service Centre, February 2023
14. Our overall audit opinion for this audit is that we can take a High level of assurance.  This means
that internal control, governance and the management of risk are at a high standard. Only
marginal elements of residual risk have been identified with these either being accepted or dealt
with. A sound system of control designed to achieve the system objectives is in place and being
applied consistently.
Recommendations
15. We have highlighted one high priority recommendations, and five low priority recommendations
and one value for money recommendation where we believe there is scope to strengthen the
control and governance environment. These are summarised below:
 HSCP must engage with CET to review the online and offline information available to
agents and customers to ensure it is accurate, up to date and reflects current team
structures and duty rotas.
 The Contact Centre should continue to update procedures to document the process for
raising issues with Services and ensure they continually reflect current working practices.
 The Customer Service Standard Charter must be updated to reflect the updated
performance standards as part of the Customer Service Strategy Review. 
 Customer Service Centre should review, with Services, the definitions of the Avoidable
and Non Avoidable Contacts with a view to gathering actionable data on the volume of
repeat contacts due to lack of follow up, availability of information and establishing
whether there is an issue with customers being unable to reach staff who have been
named as a key contacts.
 ICT to complete the planned update to Skype for Business directory.
 Contact Centre and HSCP should analyse  whether it is more efficient that certain call
types on the HSCP  Golden Number are routed directly to HSCP for them to manage
 Consideration should be given to whether it would be beneficial to reintroduce a
Customer Service Board or equivalent which would be platform to raise any issues with
Services for solutions to aide customer service and engagement. 
16. Full details of the audit findings, recommendations and management responses can be found in
Section 3 of this report and in the action plan at Appendix 1.
2. Objectives and Summary Assessment
17. Exhibit 1 sets out the control objectives identified during the planning phase of the audit and our
assessment against each objective.  
Exhibit 1 – Summary Assessment of Control Objectives 
Control
Objective
Link to Risk Assessment Summary Conclusion
1 Processes and
systems are in
place for the
handling of
customer
SRR05  High  There are processes, systems and
manuals in place for the handling of
customer contacts and enquiries.
 There would be benefit to updating
procedures to reflect current working
practices. 
Page 271

Page 272

6 
Argyll and Bute Council – Internal Audit Report – Customer Service Centre, February 2023
contacts and
enquiries. 
 Performance standards are in place,
monitored and reported. There would
be benefit to reviewing, with Services
some of the lagging indicators e.g.
Avoidable Contacts, due to the limited
availability of other real time data.
 The Customer Service Standard
Charter would benefit from a review to
reflect the updated performance
standards. 
2 Customer
contacts and
enquiries are
handled in line
with processes
and procedures. 
SRR05
SRR06
Audit Risk 1
Audit Risk 2 
Substantial  Customer contacts and enquiries are
handled in line with processes and
procedures.
 Staff do not always have up to date
information resulting in transfers to
Services to resolve.
 One Service is not engaging
appropriately despite the repeated
requests from Senior Managers to
review and update information.
3 Customer
contacts and
enquiries are
followed up in a
timely manner.   
SRR05
SRR06
Audit Risks 1 
Audit Risks 2
Unassessed
due to
unavailable
data 
 The role of the CET is to handle and
deal with initial customer contacts and
enquiries for the majority of the
Council’s Services. 
 Not all Services have access to the
Oracle CRM system used to record
fulfilment of customer interactions.  An
obstacle to monitoring follow up is lack
of integration between systems used
by Services and Oracle CRM. This
means the digital functionality to fully
test or establish whether customer
contacts and enquiries are followed up
in a timely manner is not currently
available. 
 The Council’s Customer Services
Support Team which includes the CET
have successfully retained its Customer
Service Excellence Accreditation, which
is externally assessed. The team were
specifically praised for their
commitment to a first class approach
to delivering customer focused
services. 
18. Further details of our conclusions against each control objective can be found in Section 3 of this
report.  
Page 272

Page 273

7 
Argyll and Bute Council – Internal Audit Report – Customer Service Centre, February 2023
3. Detailed Findings
Processes and systems are in place for the handling of customer contacts and enquiries.
19. The Council has processes and systems in place for the handling of initial customer contacts and
enquires. Staff, known as agents, within the Customer Service Centre (CSC) and Customer
Service Points (CSP) provide a multi-channel contact centre and switchboard facility for the
council. Inbound calls are received using the phone numbers, referred to as the ‘Golden
Numbers’ published on the Council’s Contact Us webpage.
20. Customer contacts and enquiries related to statutory duties, Registration Services and Blue
badges, are dealt with by Registrars who are based in CSPs as there is a high volume of face to
face contact for these. The Council also have a dedicated website for Marriage and Civil
Ceremonies.
21. The Netcall Contact Management System (Netcall) provides effective control of the customer
requests flowing in through the varied channels. This information is displayed on a Dashboard
which allows staff at all levels to monitor performance in real time. 
22. Information on every individual agent’s knowledge of different elements of the council and their
skills in responding through different channels is held by Netcall in an agent’s skills matrix. The
system routes all inbound requests using real time data to dynamically match incoming work to
appropriately skilled agents. This allows more complex requests like complaints to be allocated
to the most experienced agents while routine tasks like taking a payment can be routed to
agents who are developing their skills. 
23. The Oracle CRM system is used by agents to: 
 record contacts as incidents against the most suitable sub category called Products;
 identify customers using unique indicators including phone number, email or name and
address etc.
 access product Tabs, which are populated with information provided by Services, and 
can include key facts, links to the Council webpage for that Service or online forms e.g.
service requests;
 the Social Work Product Tab provides a link the HSPC SharePoint holds contact details
and Duty Rosters for the various area teams for that day or week;
 transfer unresolved enquires to Services using built in standard email templates;
 interface into OpenRevs for Council Tax and related Benefit enquiries, Carefirst Social
Care system and the Roads and Amenities Oracle CRM
 access a simple audit trail summarising the incident and if required, detailing who or
which Service an enquiry was transferred to. 
24. The Council has training manuals and procedures in place for the handling of customer contacts
and enquiries. Services are responsible for providing their own set of guidance, information and
training to agents. A review of the manuals, including those provided by Roads and Amenities
and Regulatory Services, and the procedures for dealing with customers found them to be
comprehensive. There are limited details of follow up processes as this is carried out by Services
themselves rather than centrally. 
Page 273

Page 274

8 
Argyll and Bute Council – Internal Audit Report – Customer Service Centre, February 2023
25. While the guidance and systems manuals have been updated recently, there would be benefit to
continually reviewing processes to ensure they reflect current working practices, including the
production of reports and the process for raising any issues with Services. 
Action Plan 2
26. Where services don’t provide guidance manuals they are responsible for engaging with the CET
to ensure that agents have accurate and up to date information. There is evidence that some
teams within HSCP are not fully engaging with CSC, despite repeated requests from Senior
Managers requests to review their online and offline information and that the Duty rotas and
contact details on the HSCP SharePoint are not always up to date.  A previous Review of
Customer Service Centre  by internal audit identified this issue and while the systems have been
changed the requirement to engage with CSC and to provide and update information remains
the responsibility of the Service.  
Action Point 1
27. Performance standards are in place, monitored and reported. Internally, via the Councils
scorecard system Pyramid and reports to Senior Managers/DMT and quarterly statistics are
published on the Council’s website. The aim is to ensure all “On demand” contacts such as
phone calls and web chats are responded to immediately and all “Off demand” contacts like
emails are cleared every day, this is monitored using the Netcall system dashboard. 
28. Customers can see current contact centre call volumes and waiting times on the website. To
monitor customer satisfaction every caller to the call centre is offered a short survey. The
outcomes are displayed in rolling totals on the dashboard so the supervisor can readily spot
drops in performance; usually due to technical issues and provide support to agents.
29. The aim of CSC is the timely and effective provision of information so customers do not have to
contact us needlessly, but when they to resolve their enquiries there and then. This allows
resources in Services to be focused on service delivery and not enquiry management. 
30. The Oracle CRM system is also used as a management tool to identify issues, record the quality
of service and the provision of information by classifying customer contacts as either Avoidable
or Non Avoidable Contacts. 
31. Avoidable contacts or “failure demand” are where a customer has to contact the Council
needlessly, these are further broken down to allow identification for Services of areas where
there may be issues and to identify solutions.  Categories include: 
 Service delivery failure – something promised either hasn’t been done or not done to a
satisfactory standard. 
 Equipment/System failure – Service delivery failure specifically attributable to failure of
equipment e.g. bin lorry breakdown
 Information provision failure – information required by customer is either inaccurate, is
not clear enough or is unavailable
 Needless progress chasing – customer contacts for progress update because we have
unreasonably failed to keep them up to date or inform them of the completion of their
service request. 
Page 274

Page 275

9 
Argyll and Bute Council – Internal Audit Report – Customer Service Centre, February 2023
32. Statistics for each service are examined on a quarterly basis and only shared with Services where
a trend or spike identifies an issue. These are lagging indicators and do not match real time
concerns or trends identified by staff regarding arising issues. There would be benefit to
reviewing with Services, the definitions of the Avoidable and Non Avoidable Contacts with a
view to gathering data regarding the volume of repeat contacts due to lack of follow up,
availability of information and establishing whether there is an issue with customers being
unable to reach staff who have been named as a key contacts.
Action Point 3
33. The Council’s Customer Service Charter  (the Charter) is available on the website, beside the
quarterly performance statistics.  The Charter does not reflect all the channels now available to
customers to raise initial enquiries however the current performance levels are exceeding those
stated.  The Charter is currently being reviewed based on consultation with the public after the
pandemic and will be updated to reflect the results and to take account of other key Council
Strategies including the Digital Strategy and Customer Service Strategy. 
Action Plan 4
34. The Council’s Customer Services Support Team which includes the CET have successfully
retained its Customer Service Excellence Accreditation, which is externally assessed. The team
were specifically praised for their commitment to a first class approach to delivering customer
focused services.
Customer contacts and enquiries are handled in line with processes and procedures. 
35. A visit to the CSC and CSP in Campbeltown confirmed through observation and discussions with
staff, that customer contacts and enquiries are handled in line with processes and procedures. 
36. Staff displayed a broad depth of knowledge of Council Services when handling enquiries, ranging
from a request to get new wheels for a blue bin to a customer selling and moving house. The
Council Tax enquiry required the agent to use four systems to log the incident, check and update
records for two proprieties, amend contact details, check amounts outstanding on the old
property, advise the customer of the resulting overpayment, transfer this to the new address,
arrange for updated bills and confirmation of this to be sent to the customer, add notes to the
Council Tax system and close the incident.   
37. Agents are provided with extensive training and support to develop their “Skills”. This is split
between the systems used to handle customer contacts and enquiries, which is provided by staff
within the CET and Service specific training and knowledge delivered by the service staff.  New
agents and those who are developing their skills are assigned to mentors who are on hand to
help and support them. A record of staff training is maintained. 
38. To ensure that the staff within the CET develop and maintain the required skills and have a
customer focused approach the team have adopted the Council’s Grow Our Own policy, some
examples of the success include; 
 All Digital Development staff are former CSC agents or back office service processors
 All three new Digital Agent posts have been successful candidates applying from within
the CSC/CSP cohort
Page 275

Page 276

10 
Argyll and Bute Council – Internal Audit Report – Customer Service Centre, February 2023
 The Web Developer and Digital Engagement Developer roles were graded to reflect the
complexity of the development work and systems integrations they now complete. 
39. Expected levels of performance are outlined in the Team Plan and provided to staff during their
performance and career conversations. The Agent Profile on Netcall provides daily performance
information including number of interactions handled and stored directory information.   
40. For quality and training purposes supervisors carry out call evaluations. Staff are provided with
the list of questions that they are evaluated on. In addition to receiving feedback, staff are able
to view their evaluations on the team Penny SharePoint. The focus is on the quality and accuracy
of information given and recorded and not time taken to deal with the call.   
41. The primary purpose of the agents is to resolve as many enquiries as possible at first point of
contact in order to reduce workloads on back office teams. Enquiries are only transferred to
back office where: 
 customer specifically requires to speak to a named member of staff e.g. an allocated
planning officer or social worker;
 where the agents do not have sufficient information to resolve the query; or
 the enquiry relates to a complex and technical issue that requires in depth service
knowledge or service delivery to resolve. 
42. When an enquiry or service request is transferred to the back office it is classed as closed as the
agents cannot do anything further to resolve the matter. There are a small number of services
that the team provides, where they control fulfilment of requests (e.g. Blue Badge Applications)
and there are processes in place to ensure requests are followed up to completion. A
demonstration of this was provided by the CSP Supervisor. 
43. Agents rely on the Skype for Business call directory to search for and contact staff in other
departments. The details on Skype don’t always match current staff roles, this causes difficulty
for agents trying to find out who to contact in Services. The ICT service has confirmed this is a
known issue. A solution for improving integration with ResourceLink is being finalised by the ICT
Apps and Servers teams with the aim to significantly improve the quality of information in Skype
for Business by the end of March 2023. As the source of this data is the ResourceLink system, the
quality of information presented in Skype for Business will be highly dependent on the accuracy
of the data in ResourceLink. 
Action Plan 5 
44. There are situations where agents either don’t have sufficient information or the information
they do have is out of date. This impacts upon their ability to resolve incidents at first point of
contact and results in pass backs to Services. Evidence of this can be seen in the extract of the
call handling performance statistics for January 2023. 
Page 276

Page 277

11 
Argyll and Bute Council – Internal Audit Report – Customer Service Centre, February 2023 
Queue/ Golden
Numbers
Total Calls
Queued
% of Total
Calls
Queued
%
Resolved
First Point
Calls
Transferred
%
Transferred
Social Work 1766 22% 73% 467 27%
Council Tax 1315 16% 93% 96 7%
Roads and
Amenities 1266 16% 94% 70 6%
Payments 1218 15% 96% 46 4%
Benefits 792 10% 90% 79 10%
General Enquiries 710 9% 76% 165 24%
Planning 680 8% 88% 80 12%
Regulatory
Services 227 3% 91% 20 9%
Complaints 42 1% 95% 2 5%
Book It 27 0% 89% 3 11%
Total 8043   87% 1028 13% 
45. From the statistics provided there appears to be a high proportion of calls being handled by CSC
that could be better dealt with by HSCP.  Given the high number of calls, call transfers and the
teams they are transferred to, consideration should be given to whether it would improve
efficiency for certain call types on the HSCP Golden Number to be routed directly to HSCP for
them to manage or that specific issues which require more specialist or detailed knowledge are
dealt directly by HSCP.
Action Plan 6 
46. Previously any issues with Services were raised and discussed at the Customer Services Board.
Since this was disbanded any issues arising are raised by staff through the line
management/Council Hierarchy on a more informal level either by call, meeting or emails.
Where an issue is deemed to be either a recurring issue or where there is lack of engagement
with a specific service the Customer Engagement Manger raises this with the Head of Service
Customer Support Services for discussion at DMT. 
47. Consideration should be given to whether it would be beneficial to reintroduce a Customer
Service Board or an equivalent forum which would be platform to raise any issues with Services
for solutions to aide customer service and engagement.
Action Plan 7
Customer contacts and enquiries are followed up in a timely manner
48. Not all Services use the Oracle CRM system and currently only the following incidents are
managed, by the Service, to their conclusion:
 All service requests for Roads & Amenity Services
 Complaints 
 Blue Badges
 Member zone (previously Councillor Casebook) 
Page 277

Page 278

12 
Argyll and Bute Council – Internal Audit Report – Customer Service Centre, February 2023
49. Agents are provided with copies of the Good Agent Guide which provides process for agents
when updating status for follow up enquiries/repeat calls, this explains that it only applies to
products that are managed to their conclusion in Oracle CRM. 
50. Where a service uses Oracle CRM system to deal with enquiries for their department, staff
within that service deal with the monitoring and follow up until resolution within the timescales
for that particular area. This is recorded in the systems audit log. 
51. An obstacle to monitoring follow up is lack of integration between systems used by Services and
Oracle CRM. This means the digital functionality to fully test or establish whether customer
contacts and enquiries are followed up in a timely manner is not currently available. The process
would be manual and would require Services to allocate staff to monitor and collate this
information.   
52. The Digital Service Team are currently reviewing the Oracle CRM Case progress/tracking
functionality for usefulness, usability and accessibility. 
53. When Services approach CET for help handling enquiries or tasks, the team look for ways to
build in progress tracking, follow up and task functionality. An example of this was the
digitalisation of the School P1 Registration process which has been a great success and has
helped streamline the process for Schools.   
54. Other examples of the efforts of CET to promote ways that customers can stay informed of the
progress of incidents logged and any service updates that may affect them. These include
promoting: 
 Keep in the Loop (KITL) subscription alerts which issued 266,735 emails to subscribers in
2021/22. 
 My Account using the Sign up today! banners on the Council website and the automatic
response emails sent to customers when carrying out an activity that can be tracked, like
the P1 registration process, encouraging customers to Track Progress of this request
using My Account, and providing the link to sign up or log in. 
Page 278

Page 279

Appendix 1 – Action Plan 
No Finding Risk Agreed Action Responsibility / Due Date
High
1 Failure to ensure CET have up to date Service information 
There is concern that some teams within HSPC are not
fully engaging with CSC, despite repeated requests from
Senior Managers to review their information. In addition,
the Duty rotas and contact details on the HSPC SharePoint
are not always up to date. 
HSCP must engage with CET to review the online and
offline information available to agents and customers to
ensure it is accurate, up to date and reflects current team
structures and duty rotas.
SRR06 - Insufficient
resources to ensure
effective service
delivery - Services fail to
achieve agreed
performance levels and
as a result are not
contributing fully to
Council objectives.
Provided by key officer
HSCP management will
work with the CET team
to determine the best
way to approach the
current problem and
implement the correct
solution agreeable by
HSCP and CSC.
Charlotte Craig
Business Improvement
Manager 
30th June 2023 
Low
2 Procedure Manuals 
Procedures notes would benefit from being continually
updated to reflect current working practices, including the
production of reports, raising issues with Services and to
ensure they reflect current working practices
Processes may be
applied inconsistently.
Provided by key officer
1. CSC will review
Training Manuals
for each key Service
Area (Golden
Number) with
specific focus on
escalation routes
and issue reporting.
2. CET will review
operational
performance
reporting and KPIs
as part of the
corporate
Performance
Review Project.
Robert Miller Customer
Engagement Manager 
31st October 2023
Page 279

Page 280

14 
Argyll and Bute Council – Internal Audit Report – Customer Service Centre, February 2023 
No Finding Risk Agreed Action Responsibility / Due Date
Low
3 Performance Indicators 
Information gather using the Avoidable and Non Avoidable
categories do not match real time concerns or trends
identified by staff regarding arising issues as these are
lagging indicators. 
Customer Service Centre should , with Services, review the
definitions of the Avoidable and Non Avoidable Contacts
with a view to gathering actionable data on the volume of
repeat contacts due to lack of follow up, availability of
information and establishing whether there is an issue
with customers being unable to reach staff who have been
named as a key contacts. 
Performance Measures
are not gathering
meaningful data
Provided by key officer
1. CET will engage
with Service Leads
to review Avoidable
Contact measures
and reporting. 
2. CET will send a
report with
Improvement
Recommendations
to DMT and ELT for
approval by July
2023.
Robert Miller Customer
Engagement Manager 
31st July 2023 
Low
4 The Customer Service Standard Charter 
The Charter does not reflect all the channels now available
to customers to raise initial enquiries.
The Charter is currently being reviewed based on
consultation with the public after the pandemic and will
be updated to reflect the results and to take account of
other key Council Strategies including the Digital Strategy
and Customer Service Strategy.
to be updated to reflect the updated performance
standards
The public may not be
aware of the Councils
current customer
service standards
Provided by key officer
1. CET will consult
customers on
Charter Standards
as part of the survey
informing the new
Customer Service
Strategy.
2. CET will include
proposals for a
revised Customer
Service Charter in
the Customer
Service Strategy to
be approved by ELT
and SMT.
Robert Miller Customer
Engagement Manager 
31st October 2023
Page 280

Page 281

15 
Argyll and Bute Council – Internal Audit Report – Customer Service Centre, February 2023 
No Finding Risk Agreed Action Responsibility / Due Date
Low
5 Skype for business does not contain up to date contact
details. 
ICT to complete the planned update to Skype for Business
directory.
CSC agents are unable
to identify staff in the 
Service when dealing
with customer enquiries
Provided by key officer
Improved and regular
integration between
ResourceLink and Active
Directory
Katrina Duncan
ICT Projects and Liaison
Manager 
31st  March 2023 
Low
7 Collaborative Working
Consideration should be given to whether it would be
beneficial to reintroduce a Customer Service Board or
equivalent forum which would be platform to raise any
issues with Services for solutions to aide customer service
and engagement
Lack of formal process
creates barriers to
collaborative working
resulting in inefficient
use of resources 
Provided by key officer
1. SMT has requested
a review of the
efficient delivery of
Communication and
Customer
Engagement as part
of the 24/25 budget
efficiency and this
will include
governance
arrangements such
as a joint Board.
2. CET will consult
Services on the
efficacy of a
corporate forum for
aiding the
achievement of high
levels of customer
communication,
care and
engagement to feed
into the review at 1.
Above. 
Robert Miller Customer
Engagement Manager 
31st October 2023
Page 281

Page 282

16 
Argyll and Bute Council – Internal Audit Report – Customer Service Centre, February 2023 
No Finding Risk Agreed Action Responsibility / Due Date
Value for money
6 Routing of calls to the appropriate channels 
Calls for HSPC represent the highest volume of both calls
handled by CSC and transferred to the Service. The data
provided detailing the teams the calls are transferred to
indicates that it may be more appropriate for properly
trained staff to handle and manage these calls. 
Contact Centre and HSCP should analyse whether it is
more efficient to route certain call types on the HSCP
Golden Number directly to HSCP for them to manage or
that specific issues which require more specialist or
detailed knowledge are dealt directly by HSCP.
Complex customer
contacts are not
handled appropriately
by trained staff  at the
first point of contact
who have access to the
correct information
Provided by key officer
The service will engage
in discussions with 
CET’s Customer
Engagement Manager
to ensure that suitable
arrangements are in
place which maximises
efficiency and
effectiveness of the
handling of customer
contacts and enquiries
via the HSCP Golden
Number
Charlotte Craig
Business Improvement
Manager 
30th June 2023 
Page 282

Page 283

17 
Argyll and Bute Council – Internal Audit Report – Customer Service Centre, February 2023
In order to assist management in using our reports a system of grading audit findings has been adopted to allow the significance of findings to be ascertained. 
The definitions of each classification are as follows: 
Grading    Definition
High  A major observation on high level controls and other important internal controls or a significant matter relating to the critical success of the
objectives of the system.  The weakness may therefore give rise to loss or error. 
Medium 
Observations on less significant internal controls and/or improvements to the efficiency and effectiveness of controls which will assist in meeting
the objectives of the system.  The weakness is not necessarily substantial however the risk of error would be significantly reduced if corrective
action was taken.  
Low  Minor recommendations to improve the efficiency and effectiveness of controls or an isolated issue subsequently corrected.  The weakness does
not appear to significantly affect the ability of the system to meet its objectives. 
VFM  An observation which does not highlight an issue relating to internal controls but represents a possible opportunity for the council to achieve
better value for money (VFM). 
Page 283

Page 284

18 
Argyll and Bute Council – Internal Audit Report – Customer Service Centre, February 2023
Appendix 2 – Audit Opinion 
Level of Assurance  Definition 
High 
Internal control, governance and the management of risk are at a high standard. Only marginal elements of residual risk have
been identified with these either being accepted or dealt with. A sound system of control designed to achieve the system
objectives is in place and being applied consistently. 
Substantial 
Internal control, governance and the management of risk is sound. However, there are minor areas of weakness which put some
system objectives at risk and specific elements of residual risk that are slightly above an acceptable level and need to be
addressed within a reasonable timescale. 
Reasonable 
Internal control, governance and the management of risk are broadly reliable. However, whilst not displaying a general trend,
there are areas of concern which have been identified where elements of residual risk or weakness may put some of the system
objectives at risk. 
Limited 
Internal control, governance and the management of risk are displaying a general trend of unacceptable residual risk above an
acceptable level and placing system objectives are at risk. Weakness must be addressed with a reasonable timescale with
management allocating appropriate resources to the issues raised. 
No Assurance 
Internal control, governance and the management of risk is poor. Significant residual risk and/or significant non-compliance with
basic controls exists leaving the system open to error, loss or abuse. Residual risk must be addressed immediately with
management allocating appropriate resources to the issues. 
Page 284

Page 285

Document is Restricted
Page 285 Agenda Item 17bNOT FOR PUBLICATION by virtue of paragraph(s) 6
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 286