Page 1

LiveArgyll
Internal Audit Report
January 2023
FINAL 
High Medium Low VFM
Number of
Findings
0 0 0 0 
Events Management
Audit Opinion: High

Page 2

2 
LiveArgyll – Internal Audit Report – Events Management, January 2023 
Contents 
1. Executive Summary ........................................................................................................................ 3
Introduction ............................................................................................................................................ 3
Background ............................................................................................................................................. 3
Scope ....................................................................................................................................................... 4
Risks ........................................................................................................................................................ 4
Audit Opinion ......................................................................................................................................... 4
2. Objectives and Summary Assessment ........................................................................................... 4
3. Detailed Findings ............................................................................................................................ 5
Appendix 1 – Audit Opinion ................................................................................................................... 8 
Contact Details 
Internal Auditor: Moira Weatherstone
Telephone:  01546 604146 
e-mail:   moira.weatherstone@argyll-bute.gov.uk 
www.argyll-bute.gov.uk

Page 3

3 
LiveArgyll – Internal Audit Report – Events Management, January 2023
1. Executive Summary
Introduction
1. As part of the 2022/23 internal audit plan, approved by the Audit & Scrutiny Committee in
March 2022, we have undertaken an audit of LiveArgyll’s system of internal control and
governance in relation to Events Management. 
2. The audit was conducted in accordance with the Public Sector Internal Audit Standards (PSIAS)
with our conclusions based on discussions with LiveArgyll officers and the information available
at the time the fieldwork was performed. The findings outlined in this report are only those
which have come to our attention during the course of our normal audit work and are not
necessarily all the issues which may exist. There are no agreed actions as a result of this report;
however it is the responsibility of management to determine the extent of the internal control
system appropriate to LiveArgyll. 
3. The contents of this report have been agreed with the appropriate LiveArgyll officers to confirm
factual accuracy and appreciation is due for the cooperation and assistance received from all
officers over the course of the audit.
Background
4. LiveArgyll was established by the Council and is a company limited by guarantee, governed by its
articles of association. This charitable company (charity number SC047545) is fully incorporated
and commenced trading on 2 October 2017. The Council provides support services to LiveArgyll
as outlined in the Service Level Agreement (SLA), this includes internal audit services to support
their governance framework. 
5. LiveArgyll is run by board members from the local community, there are 7 Trustees, all of whom
are volunteers and support the strategic direction and governance of the company led by the
General Manager. 
6. LiveArgyll are responsible for operating the Council’s leisure facilities, libraries, halls and
community centres. The Council continue retain ownership of the assets, however, the day-to-
day operations of the facilities is the responsibility of LiveArgyll. 
7. Events management within LiveArgyll can include weddings, conferences, charity events, parties
and organised concerts. Events mainly take place in the three halls - Coran Halls in Oban, the
Queens Hall in Dunoon or the Victoria Hall in Helensburgh. 
8. Events management is the process of planning and hosting large or small scale public or private
events either for social or business purposes.  The process of planning an event can include
budgeting, advertising, scheduling, catering, co-ordinating with 3rd parties, obtaining relevant
licences, risk assessments and health safety arrangements.

Page 4

4 
LiveArgyll – Internal Audit Report – Events Management, January 2023
Scope 
9. The scope of the audit was to assess procedures to manage events hosted in LiveArgyll venues
including controls over revenue, expenditure, risk management and insurance as outlined in the
Terms of Reference agreed with the Business Operations Manager on 12 December 2022.
Risks
10.  The risks considered throughout the audit were: 
 Strategic Risk - Reduced Income levels due to economic climate. Impact of Covid19 on
local economy and consequently levels of disposable income
 Strategic risk: Failure to effectively market and promote services
 Audit Risk 1 - failure to have event management processes in place
Audit Opinion
11. We provide an overall audit opinion for all the audits we conduct. This is based on our
judgement on the level of assurance which we can take over the established internal controls,
governance and management of risk as evidenced by our audit work.  Full details of the five
possible categories of audit opinion is provided in Appendix 1 to this report. 
12. Our overall audit opinion for this audit is that we can take a high level of assurance.  This means
that internal control, governance and the management of risk are at a high standard. Only
marginal elements of residual risk have been identified with these either being accepted or dealt
with. A sound system of control designed to achieve the system objectives is in place and being
applied consistently.
2. Objectives and Summary Assessment
13. Exhibit 1 sets out the control objectives identified during the planning phase of the audit and our
assessment against each objective.  
Exhibit 1 – Summary Assessment of Control Objectives 
Control Objective Link to Risk Assessment Summary Conclusion
1 Procedures are in
place to manage
events hosted in
LiveArgyll venues
Audit Risk 1 Substantial Procedures are in place to
manage events. The ‘Live Events
and Shows Process’ document
outlines the process to be
followed from the receipt of an
enquiry to hold an event to post
show activities. In addition,
numerous other operating
procedures and standard
documentation is in place to
assist with the running of events.
2 Controls are in place
over income and
expenditure with
budget monitoring
Strategic risk:
Reduced Income
levels due to
economic climate.
Substantial Income and expenditure are
projected in advance of an
event, with a post event review
being undertaken looking at

Page 5

5 
LiveArgyll – Internal Audit Report – Events Management, January 2023
processes
established
Impact of Covid19
on local economy
and consequently
levels of disposable
income
projected figures against actual. 
The Council as required by the
SLA, with meetings being held
between the Council and
LiveArgyll, supports ongoing
budget monitoring.
3 Events are actively
promoted and
marketed
Strategic risk:
Failure to effectively
market and
promote services
Substantial Events are actively promoted
and marketed through a variety
of media with the marketing
team closely monitoring ticket
sales and where necessary
looking for additional avenues to
promote a particular event.
4 Controls are in place
for risk
management for
events and relevant
insurances are in
place
Audit Risk 1 Substantial Controls are in place to assess
the risks for each event with
standard risk assessment
templates available to complete. 
The Council, in line with the
Service Level Agreement (SLA)
provide Health & Safety (H&S)
advice and support to LiveArgyll. 
Over and above the insurance
provided by the Council, in line
with the SLA, commercial event
organisers must show proof of a
minimum of £5m insurance
cover.   
14. Further details of our conclusions against each control objective can be found in Section 3 of this
report.  
3. Detailed Findings
Procedures are in place to manage events hosted in LiveArgyll venues
15. Events within LiveArgyll can include weddings, conferences, charity events, parties and
organised concerts, events mainly taking place in the Coran Halls in Oban, the Queens Hall in
Dunoon or the Victoria Hall in Helensburgh. 
16. Procedures are in place to manage events. The ‘Live Events and Shows Process’ document
outlines the process to be followed from the receipt of an enquiry to post event activities. At
each stage of the process the document identifies the staff team responsible for each task. 
17. A number of standard template documents are available and in use including: 
 venue Hire Terms and Conditions;
 staff Pre-event Briefing Form for staff to communicate key points of the Event Risk
Assessment and pre-event checklist;

Page 6

6 
LiveArgyll – Internal Audit Report – Events Management, January 2023
 security Pre-Event Briefing checklist to meet the Head External Stewards for event
briefing to communicate key points of the Event Risk Assessment, ensuring there is
adequate stewards to meet the risk assessment requirements;
 post Show Report check list;
 standard Operating Procedures. 
18. LiveArgyll use Eventbrite, an online ticket management system to manage ticket sales. The
Eventbrite – document ‘Events Payment Process’ outlines the various steps to be followed to
manage income from ticket sales.
Controls are in place over income and expenditure with budget monitoring processes
established
19. Controls are in place over income and expenditure. A standard template is used for revenue
projections and income is projected for the following year based on the number of scheduled
events. Expenditure projections are calculated in advance of each event.  The costs included in
the projections are the ‘additional’ costs the event incurs rather than a ‘full absorption costing’
approach.   
20. Ongoing budget monitoring arrangements are part of the Service Level Agreement with the
Council.  LiveArgyll and Council finance staff hold monitoring meetings, looking at all budgets
across LiveArgyll.  In 2021/22, an audit of Budget Monitoring was undertaken and provided a
high level of assurance.
Events are actively promoted and marketed 
21. Events are actively promoted and marketed, with a number of media resources being used,
including Facebook, Instagram and twitter. In addition to Social Media channels, various other
media is used to promote events, including: 
 LiveArgyll website; 
 partnership working with Wild about Argyll;
 AITC partnership as well as other stakeholders;
 The List website;
 What’s on and local papers; 
 member newsletters;
 TV screens in facilities;
 partnership working with Dunoon Cinema where members get discount as part of a joint
promotion; 
 digital screens and push notifications. 
22. An advertising pack to promote venues within LiveArgyll is available. This provides information
on what LiveArgyll offers in terms of events hosted in their venues, including information on
promotional opportunities. 
23. The Commercial/Marketing Team have responsibilities outlined in the Live Events and Shows
Process document, including:

Page 7

7 
LiveArgyll – Internal Audit Report – Events Management, January 2023
• checking the event spreadsheet on a weekly basis to ensure that all marketing materials
have been sent by promoters;
 contacting promoters where events may need some additional marketing to discuss
options on how to increase interest in their event and the potential costs. 
Controls are in place for risk management for events and relevant insurances are in place
24. The Council, within the terms of the SLA provide LiveArgyll with health and safety advice,
training, audits and incident and near miss investigations in order to help ensure that the
appropriate corporate health and safety arrangements are in place and properly complied with
on a comparable basis to similar services currently provided to the Council's directorates and
services. The Council’s Health & Safety team undertake internal audits of one facility each year
and this includes looking at any event risk assessments.  LiveArgyll completes a standard risk
assessment template prior to events taking place. 
25. The hirer is responsible for securing any permits required for the performances of copyright
work unless specified in booking agreement.  LiveArgyll check this prior to the event. 
26. For major/one off events the hirer must hold public liability insurance with a minimum
indemnity of £5 million, this is checked by LiveArgyll prior to the event. Exemptions to this would
be private hires by individuals e.g. wedding receptions and birthday parties and hires which are
community based and do not involve a large number of participants such as indoor bowling, tea
dances, bridge clubs etc. Within the terms of the SLA, the Council provides insurance cover.

Page 8

Appendix 1 – Audit Opinion 
Level of Assurance  Definition 
High  Internal control, governance and the management of risk are at a high standard. Only marginal elements of residual risk have
been identified with these either being accepted or dealt with. A sound system of control designed to achieve the system
objectives is in place and being applied consistently.
Substantial  Internal control, governance and the management of risk is sound. However, there are minor areas of weakness which put some
system objectives at risk and specific elements of residual risk that are slightly above an acceptable level and need to be
addressed within a reasonable timescale.
Reasonable  Internal control, governance and the management of risk are broadly reliable. However, whilst not displaying a general trend,
there are areas of concern which have been identified where elements of residual risk or weakness may put some of the system
objectives at risk.
Limited 
Internal control, governance and the management of risk are displaying a general trend of unacceptable residual risk above an
acceptable level and placing system objectives are at risk. Weakness must be addressed with a reasonable timescale with
management allocating appropriate resources to the issues raised. 
No Assurance  Internal control, governance and the management of risk is poor. Significant residual risk and/or significant non-compliance with
basic controls exists leaving the system open to error, loss or abuse. Residual risk must be addressed immediately with
management allocating appropriate resources to the issues.