Page 1

Argyll and Bute Council
Internal Audit Report
March 2023
FINAL 
High Medium Low VFM
Number of
Findings
0 0 1 1 
Building Standards
Audit Opinion: High

Page 2

2 
Argyll and Bute Council – Internal Audit Report – Building Standards, March 2023 
Contents 
1. Executive Summary ........................................................................................................................ 3
Introduction ............................................................................................................................................ 3
Background ............................................................................................................................................. 3
Scope ....................................................................................................................................................... 4
Risks ........................................................................................................................................................ 4
Audit Opinion ......................................................................................................................................... 4
Recommendations ................................................................................................................................. 4
2. Objectives and Summary Assessment ........................................................................................... 5
3. Detailed Findings ............................................................................................................................ 6
Appendix 1 – Action Plan ..................................................................................................................... 11
Appendix 2 – Audit Opinion ................................................................................................................. 13 
Contact Details 
Internal Auditor: Mhairi Weldon 
Telephone:  01546 604294 
e-mail:   Mhairi.weldon@argyll-bute.gov.uk

Page 3

3 
Argyll and Bute Council – Internal Audit Report – Building Standards, March 2023
www.argyll-bute.gov.uk
1. Executive Summary
Introduction
1. As part of the 2022/23 internal audit plan, approved by the Audit & Scrutiny Committee in
March 2022, we have undertaken an audit of Argyll and Bute Council’s (the Council) system of
internal control and governance in relation to Building Standards.
2. The audit was conducted in accordance with the Public Sector Internal Audit Standards (PSIAS)
with our conclusions based on discussions with council officers and the information available at
the time the fieldwork was performed. The findings outlined in this report are only those which
have come to our attention during the course of our normal audit work and are not necessarily
all the issues which may exist. Appendix 1 to this report includes agreed actions to strengthen
internal control however it is the responsibility of management to determine the extent of the
internal control system appropriate to the Council.
3. The contents of this report have been agreed with the appropriate council officers to confirm
factual accuracy and appreciation is due for the cooperation and assistance received from all
officers over the course of the audit.
Background
4. The Building (Scotland) Act 2003 and secondary legislation set out the role of Local Authority
Verifiers of the Scottish building standards system.  In appointing verifiers, Scottish ministers
consider qualifications, competence, accountability to the public and impartiality.  Verifiers are
appointed to administer the building standards system for their own geographic area on the
condition that they meet the verification Operating Framework and Performance Framework
2017.
5. The principal aim of building standards is to ensure the health, safety and welfare of people in
and around buildings, the conservation of fuel and power and the encouragement of
sustainability in buildings.  This is achieved through the processing of warrant applications and
issuing/acceptance of completion certificates to ensure compliance with the building standards.
6. The building standards system in Scotland is administered by Local Authority verifiers appointed
by the Minister for Local Government, Housing and Planning.  Verifiers carry out the important
function of protecting the public interest by providing an independent check of applications for
building warrants to construct or demolish buildings, to provide services, fittings or equipment in
buildings or building conversions.  They check the work during the design phase before granting
a building warrant and during the construction phase before accepting a completion certificate. 
There are five key stages of the customer’s journey, these are:
 Project scoping and pre-application
 Application for building warrant
 Granting of building warrant
 Building work starts (or conversion takes place)
 Submission and acceptance of completion certificate

Page 4

4 
Argyll and Bute Council – Internal Audit Report – Building Standards, March 2023
7. Argyll and Bute Council (The Council) Building Standards Team have successfully secured their
annual re-accreditation assessment for the Customer Service Excellence standard in May 2022. 
This is the only Government endorsed standard in the UK comprising of 57 compliance elements. 
The team have achieved compliance with all 57 elements with Compliance+ status in 23
elements to demonstrate ongoing improvements and increasing levels of customer service.  This
falls to be reassessed in May 2023.
8. The Council received the Local Authority Building Standards Scotland (LABSS) award for
outstanding service and commitment in customer focus on 16 September 2022.
9. The Building Standards Team undertakes verification work on behalf of 2 other local authorities
on a commercial basis and overall is self-funding with a net income of £52k achieved in 2021/22.
Scope 
10. The scope of the audit was to review the systems and processes in place to support compliance
with the verification scheme as outlined in the Terms of Reference agreed with the Head of
Development and Economic Growth on 31 January 2023. 
Risks
11.  The risks considered throughout the audit were:
 ORR04:  Resource availability:  Building Warrant fee shortfalls
 ORR06:  Resource availability:  One third of the existing Building Standards team are due
to retire within the next five years
 Audit Risk 1:  Failure to comply with regulations resulting in loss of verifier licence and
subsequent income stream 
Audit Opinion
12. We provide an overall audit opinion for all the audits we conduct. This is based on our
judgement on the level of assurance which we can take over the established internal controls,
governance and management of risk as evidenced by our audit work.  Full details of the five
possible categories of audit opinion is provided in Appendix 2 to this report.
13. Our overall audit opinion for this audit is that we can take a high level of assurance.  This means
that Internal control, governance and the management of risk are at a high standard. Only
marginal elements of residual risk have been identified with these either being accepted or dealt
with. A sound system of control designed to achieve the system objectives is in place and being
applied consistently. 
Recommendations
14. We have highlighted one low priority and one value for money recommendations where we
believe there is scope to strengthen the control and governance environment. These are
summarised below:
 A record of systems training provided should be maintained.

Page 5

5 
Argyll and Bute Council – Internal Audit Report – Building Standards, March 2023
 Building Standards services should revisit the reporting functionality of the IDOX system
and assess if historical issues have been addressed and raise any outstanding anomalies
with the system provider.  This will provide contingency for MS Access reporting.
15. Full details of the audit findings, recommendations and management responses can be found in
Section 3 of this report and in the action plan at Appendix 1.
2. Objectives and Summary Assessment
16. Exhibit 1 sets out the control objectives identified during the planning phase of the audit and our
assessment against each objective.  
Exhibit 1 – Summary Assessment of Control Objectives 
Control Objective Link to Risk Assessment Summary Conclusion
1 The Council provides
an efficient and
effective service
across all aspects of
building standards
verification work
All Risks High There is a clear commitment to
providing a fully digital verification
service with systems and processes in
place to support processing of
information, supervision and provision
of performance information for
management and also for statutory
publication.  Information and guidance
is available to the public via the
Council’s website or via links provided
and appropriate benchmarking activity
takes place.
2 Funds and resources
are managed
efficiently and
effectively to
maintain
productivity and
reliable ICT
infrastructure
All Risks Substantial Staff are appropriately trained and
qualified and formal partnership
arrangements are in place to provide
specialist support.  Capacity issues are
regularly discussed and resilience
measures are in place across the
Council area.  Systems are managed by
the Council’s ICT services and
administered by Building Standards. 
Users are appropriately managed with
access rights in place to reflect
respective roles, in-house systems
training is provided however there is
no record maintained.  Performance
information is extracted using
additional software to interrogate data
and may be subject to additional
licencing costs in the future. Regular
meetings take place with the
appointed finance contact to identify
and address any concerns that arise,
the budgeted income for the year is on
track to exceed verification service
costs.

Page 6

6 
Argyll and Bute Council – Internal Audit Report – Building Standards, March 2023
3 Verifier actions are
in alignment with
the performance
framework and
undertaken in a
consistent manner
Audit Risk 1 High Applications are assessed and allocated
to officers on a competence basis with
appropriate supervision and review in
place.  Performance information is
accurately reflected in reports
submitted to Scottish Government and
published on the Council’s website. 
4 The Building
standards service
demonstrates a
commitment to
continuous
improvement and
partnership working
Audit Risk 1 High Areas for improvement are identified
by appropriate means, they are added
to a log published on the Council’s
website along with progress in
implementation.  Collaborative
working takes place with other
verification authorities to share best
practice and discuss matters arising. 
17. Further details of our conclusions against each control objective can be found in Section 3 of this
report.  
3. Detailed Findings
The Council provides an efficient and effective service across all aspects of building standards
verification work
18. Applications for building warrants are made via an online portal provided by Scottish
Government which sends the information to the Council’s IDOX case management system via a
series of technical scripts to ensure that both systems contain the same information.  A very
small amount of applications are received in paper format and these are input to the portal by
officers to ensure all applications are consistently processed, this also demonstrates a clear
commitment to promoting the digitisation of verification services.  Alongside the IDOX system
sits the CIVICA, document management system that stores all associated documents issued and
received as well as providing the various workflows that officers are required to follow to ensure
work is carried out in compliance with requirements.  
19. Fees associated with the application are paid to the Council directly via a link provided within the
Scottish Government Portal or sent directly to the Council’s office at Manse Brae.
20. A walkthrough of system functionality was provided by the Systems Administrator which
demonstrated a robust, logical and transparent process with each staged process generated by
responses from the previous on CIVICA.  Process maps and procedures are available to all using
CIVICA with additional copies available on a SharePoint site, these are regularly reviewed and
team members made aware of any updates.  The Procedural Handbook provided by Scottish
Government is published on the internet and available to the public.   The Council’s fees and
charges schedule is consistent with fees published in the Procedural Handbook and standard
document templates generated by CIVICA are currently being reviewed.  
21. Both IDOX and CIVICA are interrogated monthly to provide statistical information to team
leaders and quarterly to provide performance information for reporting purposes.
22. A set of Key Performance Outcomes (KPOs) have been published by the Scottish Government
which are required to be adopted by all Building Standards units providing a verification service.

Page 7

7 
Argyll and Bute Council – Internal Audit Report – Building Standards, March 2023
The KPOs have been implemented and results are published on the Council’s website in the
Annual Verification Performance Report that is updated quarterly.  Where appropriate, the
targets and results for KPOs are also updated quarterly on Pyramid, the Council’s performance
management system.
23. The Annual Verification Performance Report includes the details of the verification services
provided by the Council and contextual details of the related performance measures and results
achieved.  
24. Performance targets set are mostly aligned with requirements stipulated in the Scottish
Government KPOs, one exceeds the requirement but will revert to match in the new financial
year to ease pressure on officers and allow additional focus on commercial work.  
25. The Council participates in benchmarking activity with the Clyde Valley Consortia and nationally
across all 32 Scottish Councils which contributes to a national report published on the Scottish
Government Website.  Wider information sharing also takes place with the Local Authority
Building Standards Scotland (LABSS) to share good practice and address any common issues.
26. The Council is required to make information and guidance available to the public including,
Building Standards Register, copy documents, Customer Charter, performance reports, appeals
and complaints procedure and general information.   All were found to be available on the
Council’s website or via additional links provided with the exception of copy documents that are
only available to current or prospective owner, occupier or tenant by legislation and these can
be requested by completing an online application form.
Funds and resources are managed efficiently and effectively to maintain productivity and
reliable ICT infrastructure
27. Professional staff are required to be educated to degree level and hold professional membership
of a relevant organisation such as the Royal Institute of Chartered Surveyors (RICS).  Assistants
are in training and shadow professional members of staff who review and verify their work. 
Officers are responsible for meeting their own continuing professional development (CPD) as
required to maintain their respective professional designations although some training is
available in-house e.g. via team meetings or the Council’s eLearning platform LEON.  Any issues
identified in the recording of information is also discussed at team meetings to reinforce training
previously provided.  The council participates in a national competency framework that is in
place across all Local Authorities in Scotland with good results.
28. A staff register of interests is not currently maintained, however, officers are aware of the need
to advise management of any conflict of interest and request reallocation to another officer or
area team.  Officers are permitted to undertake private work in their own time, with prior
consent from the Regulatory Services and Building Standards Manager, as long as it is out-with
the Council area and does not impact on Council work.
29. Formal partnership arrangements are in place with Glasgow Caledonian University and ATK
Partnership to address specialist subject matter where there is no in-house expertise, both of
these arrangements are currently operating under extensions.
30. A Critical Activity Recovery Plan (CARP) is in place which outlines arrangements that can be
implemented within each local area should the need arise.  There is ongoing resilience within the
team across the Council as any officer can process applications for any area, however, wherever
possible, any visits required are undertaken by local officers to save on travel time and costs.

Page 8

8 
Argyll and Bute Council – Internal Audit Report – Building Standards, March 2023
31. Capacity issues are regularly discussed at weekly team meetings or with Regulatory Services and
Building Standards Manager as required.  Discussions may result in a decision to de-prioritise
commercial work to ensure the Council’s own statutory requirements are met.  
32. The IDOX and CIVICA systems as well as Server and SharePoint data are managed by the
Council’s ICT services and are regularly backed-up as part of a corporate process.  Patches to
maintain security and optimum functionality are applied out with working hours where possible
unless the update is urgent.  System upgrades are tested by the systems administrator on a
separate test system prior to implementing on the live system upon acceptance.  Copies of all
templates used are retained on a server to allow manual communications to take place should
IDOX and CIVICA be unavailable for extended periods of time, these would be updated on both
systems retrospectively.
33. Systems and servers are accessed by all members of the Building Standards team upon
recruitment and completion of the corporate Acceptable Use Policy.  Access rights are
commensurate with levels of responsibility and user access is promptly removed when no longer
required upon transfer or resignation.  Although the Council undertakes some commercial work,
this work cannot be accessed by other Local Authorities.   A list of current system users was
reviewed and found to be appropriate.
34. The systems administrator provides user training to all officers and administrative staff upon
recruitment and following upgrades that result in system changes or additional functionality. 
Customer Service Centre staff who are expected to attend to planning and building standards
matters are also trained by the systems administrator and an instruction note provided.  A
record of systems training is not currently maintained.
Action Plan 1
35. The IDOX system is required to contain a range of fields from which KPO information can be
reported, screen sharing technology was used to test the system and it was found that all
required fields were available and were being used.  
36. Quarterly performance reports are provided to Scottish Government and published on the
Council’s website in the month following the end of the reporting quarter.  Data to inform these
reports is extracted from the IDOX system using MS Access due to historical issues in obtaining
good quality reports from IDOX.  Ad-hoc management information can be also be extracted and
any revisions to reporting requirements imposed by Scottish government can be implemented
promptly by the Systems Administrator who can update or create bespoke reports on MS Access
without the need to liaise with the IDOX system supplier. 
37. The Council is moving to use MS Office 365 across all services, however, MS Access is not
included within this package and therefore not covered by that licence agreement.  MS Access
2013 will cease to be supported by Microsoft from 31 March 2023 and will therefore be
removed from the Council’s software estate, MS Access versions from 2016 to 2021 will be
available under existing licence arrangements until 2026, thereafter, additional licence fees
would be applicable.  Following discussions with the Systems Administrator, an exercise has
commenced to compare content of IDOX reports with those produced via MS Access to asses if
historical issues have been addressed by the system supplier.
Action Plan 2

Page 9

9 
Argyll and Bute Council – Internal Audit Report – Building Standards, March 2023
38. Regular meetings take place with the Finance Officer assigned to the building standards service
where trends are reviewed over a 5 year period and projections are calculated for the current
year.  The analysis provided for January 2023 indicates that the income is expected exceed the
budget value although the target may require to be reduced.  
Verifier actions are in alignment with the performance framework and undertaken in a
consistent manner
39. All applications received are assessed by a Team Leader who will look at the type and value of
works to determine who will undertake the work based on qualification and competence of
surveyor or assistant.   The risk level of an application is consistent with the allocation process,
however, the risk level is not entered to the system for all applications, only those that are
included within the quality assurance process.  
40. The quality assurance process requires that a minimum of 5% of all applications are reviewed by
a professional officer.  Two possible checks take place, the first for issue of a points letter and
the second for issue of a building warrant, both checks are for separate processes and are
independent of each other.  The sample selected for review is predominantly random
augmented with some targeted sampling.  The IDOX system contains details of checks that have
taken place and associated documentation is generated in CIVICA.   Data extracted from IDOX
indicates that between 8.3% and 14.5% of applications have been checked over the last 4 years
due to nature of applications received and staff competencies, therefore exceeding the target.
41. Quarter 3 performance information was reviewed to assess if the data included within the
quarterly report was accurate:
 KPO1 – requires the service to minimise the time taken to issue a first report, building
warrant or amendment, data extracts from the IDOX system were reviewed to verify the
figures reported in support of time taken to issue the stated documentation and these
were found to be accurate.
 KP05 – requires the service to maintain financial governance, for the purpose of this KPO
only verification work is permitted for inclusion, other statutory work is excluded.  A
historical calculation of 87% time spent on verification work has been applied and
considered to remain appropriate although there may be immaterial fluctuations.
Reports were run from the Council’s financial management system (FMS) to verify cost
figures reported.  The income figures were verified using data extracted from IDOX to
exclude income from commercial work undertaken as this is not recorded separately on
the FMS.  Both figures reported were found to be accurate.
 KPO6 – requires the service to commit to eBuilding Standards, the Council’s website
provides a great deal of information for the public along with links to the Scottish
Government’s Portal to submit their application electronically, any applications that are
received manually are input to the system by officers thereby ensuring that all processes
are managed electronically.
 KPO7 – requires the service to commit to objectives outlined in the annual verification
performance report, this report is published on the Council’s website with quarterly
updates, and each report shows summary of last 4 quarters and therefore equivalent to
an annual report.  There is no separate annual report.

Page 10

10 
Argyll and Bute Council – Internal Audit Report – Building Standards, March 2023
42. The Building Standards service has not set a target for KPO2 although this is currently being
considered.  Additionally, the service was successfully assessed against Customer Service
Excellence (CSE) standards with the most recent report dated 9 June 2022, therefore KPOs 2, 3
and 4 were not included in the Q3 review of supporting data.
The Building standards service demonstrates a commitment to continuous improvement and
partnership working
43. Areas for improvement are identified by a number of means such as the annual CSE review,
review of complaints received, discussions at team meetings and information sharing via
networking arrangements. 
44. Areas for improvement that have been identified are added to a service improvement log which
is published on the Council’s website.  This has been maintained since 2007 and last updated
February 2023, it indicates the benefits achieved as well as a description of each improvement
identified, the reason, who suggested it and when the improvement was introduced.  
45. There is strong evidence of collaborative working taking place, this includes, Scottish
Government to maintain compliance with national requirements, the Clyde Valley Building
Standards Consortia and LABSS to consider common issues, aid consistency and share best
practice, Area Property Action Groups which consider the Council’s position in respect of
properties, land or buildings, external suppliers to undertake specialist assessments and
commercial arrangements with two other Local Authorities.

Page 11

Appendix 1 – Action Plan 
No Finding Risk Agreed Action Responsibility / Due Date
Low
1 Systems Training Record
Finding:  A record of systems training that has been
provided is not currently maintained. 
Recommendation:  A record of systems training provided
should be maintained. 
Management is unable
to obtain information in
support of training
provided and staff
competence in system
usage.  
Establish the training
record for systems
training and
arrangements for
maintaining the records.
Principal Team Lead –
Building Standards 
30 April 2023
VFM
2 KPO Reporting
Finding:  MS Access is used to extract data from the IDOX
system for KPO reporting, however, a move to corporate
use of MS Office 365 means that MS Access is not included
within that licence agreement.  Support for MS Access
2013 will expire 31 March 2023 and newer existing
versions by 31 March 2026 thereafter additional
arrangements and licences will be required. 
Recommendation:  Building Standards services should
revisit the reporting functionality of the IDOX system to
assess if historical issues have been addressed and raise
any outstanding anomalies with the system provider.  This
will provide contingency for MS Access reporting.  This will
provide contingency for MS Access reporting.
Use of MS Access may
require additional
licencing fees from
2026.
1. Run all 7 IDOX
standards reports
and compare with
the services MS
Access reports
2. Identify and
investigate
differences
3. Report findings to
IDOX and request
feedback
4. Evaluate feedback
and consider issues
to service
5. Decide whether to
continue with
existing MS Access
Reports or to
migrate to IDOX
suite of standard
reports.
Actions 1 – 3 
Building Standards Data
Systems Technician 
30 June 2023 
Actions 4 – 5 
Regulatory Services and
Building Standards
Manager 
31 December 2023

Page 12

12 
Argyll and Bute Council – Internal Audit Report – Building Standards, March 2023
In order to assist management in using our reports a system of grading audit findings has been adopted to allow the significance of findings to be ascertained. 
The definitions of each classification are as follows: 
Grading    Definition
High  A major observation on high level controls and other important internal controls or a significant matter relating to the critical success of the
objectives of the system.  The weakness may therefore give rise to loss or error. 
Medium 
Observations on less significant internal controls and/or improvements to the efficiency and effectiveness of controls which will assist in meeting
the objectives of the system.  The weakness is not necessarily substantial however the risk of error would be significantly reduced if corrective
action was taken.  
Low  Minor recommendations to improve the efficiency and effectiveness of controls or an isolated issue subsequently corrected.  The weakness does
not appear to significantly affect the ability of the system to meet its objectives. 
VFM  An observation which does not highlight an issue relating to internal controls but represents a possible opportunity for the council to achieve
better value for money (VFM).

Page 13

13 
Argyll and Bute Council – Internal Audit Report – Building Standards, March 2023
Appendix 2 – Audit Opinion 
Level of Assurance  Definition 
High 
Internal control, governance and the management of risk are at a high standard. Only marginal elements of residual risk have
been identified with these either being accepted or dealt with. A sound system of control designed to achieve the system
objectives is in place and being applied consistently. 
Substantial 
Internal control, governance and the management of risk is sound. However, there are minor areas of weakness which put some
system objectives at risk and specific elements of residual risk that are slightly above an acceptable level and need to be
addressed within a reasonable timescale. 
Reasonable 
Internal control, governance and the management of risk are broadly reliable. However, whilst not displaying a general trend,
there are areas of concern which have been identified where elements of residual risk or weakness may put some of the system
objectives at risk. 
Limited 
Internal control, governance and the management of risk are displaying a general trend of unacceptable residual risk above an
acceptable level and placing system objectives are at risk. Weakness must be addressed with a reasonable timescale with
management allocating appropriate resources to the issues raised. 
No Assurance 
Internal control, governance and the management of risk is poor. Significant residual risk and/or significant non-compliance with
basic controls exists leaving the system open to error, loss or abuse. Residual risk must be addressed immediately with
management allocating appropriate resources to the issues.