Page 1

Argyll and Bute Council 
Internal Audit Report
July 2023
Final 
Contact Details 
Internal Auditor: Leanne Rennie
Telephone:  01369 708516
e-mail:   leanne.rennie@argyll-bute.gov.uk 
LiveArgyll 
Establishment Visit
Kintyre Community Centre  
Audit Opinion: Green

Page 2

2 
LiveArgyll – Internal Audit Report – LiveArgyll Establishment Visit – Kintyre Community Centre – July
2023
1. Executive Summary
Introduction
1. As part of the 2023/24 internal audit plan agreed with LiveArgyll management, we undertake
establishment visits at LiveArgyll sites. LiveArgyll operate 26 establishments and we have agreed
that 19 of these will be subject to establishment visits over a cyclical basis. Appendix 1 sets out
the schedule. Establishment visits focus on the areas set out in exhibit 1 and we have agreed
checklists for each area with LiveArgyll management.  
Exhibit 1 – Establishment Visits Areas of Focus
Building Exterior Floors Environment Baby Changing Units
Doors Public Spaces Signage Income Collection / Facility Booking
Ceilings Windows Fixtures & Fittings Floats
Walls Elevators Toilets Banking
Swimming Pool /
Health Suite
Library Sports Hall / Gym Staff 
2. The audit tests are predominantly observational so any issues highlighted are based on what was
witnessed on the visit day. Due to the limiting nature of this as audit evidence we do not include
recommendations in this report.  Rather it provides an overview of issues identified allowing the
LiveArgyll management team to determine whether any corrective action is required.
3. To ensure consistency of approach, the issues raised do not take account of any planned
structural work in the short to medium term. For example, if we identify superficial structural
damage we will still report it even if we are aware the establishment is due to be refurbished.
Background
4. On Tuesday 4th July 2023 we visited the Kintyre Community Centre. The scope of the audit was
to assess the site against the audit questions agreed with LiveArgyll.
Audit Opinion
5. We provide an overall audit opinion for all the establishment visits we conduct. This is based on
our judgement on the extent to which there are issues requiring corrective action and how
critical they are.  We assess establishment visits as either:
 Red – Intervention is required to correct material areas of concern
 Amber – Issues identified can be managed through a programme of works 
 Green – Issues identified are relatively minor 
6. Our overall opinion for this establishment visit is Green. This means that we have not identified
any issues which we consider to be material or requiring short to medium term attention.
Findings
7. Exhibit 2 summarises the conclusions of the work and any observations made on the day of the
visit.

Page 3

3 
LiveArgyll – Internal Audit Report – LiveArgyll Establishment Visit – Kintyre Community Centre – July
2023
Exhibit 2 – Summary Assessment of Control Objectives 
Area Strengths Areas for Consideration
1 Building
Exterior
On approach the building conveys the
appropriate corporate image.
None
2 Doors The main entrance doors open freely. None
3 Ceilings Ceilings are in good condition with no cracks
and very little water damage.
There are historical water marks
on the ceiling as you go up the
stairs. There are also some tiles
missing (although they are
possibly inside the ceiling and
have not been put back in
place). 
One of the meeting rooms
(Dunaverty Suite) also has an
ongoing leak that only occurs
during heavy rain and
dependent on the way the wind
is blowing. 
4 Walls The walls are clean and dirt free, however,
being an older building there is evidence of
marks from historic water damage, scuffs,
cracks and chipped plaster. 
None
5 Floors &
Public Spaces 
Flooring area all appears clean and tidy. The
main reception is clutter free with only
essential equipment. 
The landline for the Centre has
been out of operation for some
time. 
6 Windows  The majority of the windows in the Centre
are elevated (and therefore do not open
freely) and do not appear to have any
damage or cracks.
None
7 Elevators There is 1 elevator in the Centre that is in
good working order.
None
8 Environment There is adequate lighting and ventilation
and noise levels are acceptable. All lights are
in good working order and bins are emptied
several times a day.
None
9 Signage There is both external and internal LiveArgyll
signage and the opening hours of the Centre
are displayed on the front door.
None
10 Noticeboards
& Leaflets
There is adequate and up to date
noticeboards. 
None
11 Furniture,
Fittings &
Equipment
All furniture and fittings are in good clean
order and not in a hazardous position. All
sockets are in good working order.
None
12 Toilets  The toilets are all clean and tidy, without
breakages, however, they are all very tired
looking with age old marks on both the walls
and floors. 
None
13 Baby
Changing
Units
There is one baby changing unit in the
Centre and this is located in the disabled
None

Page 4

4 
LiveArgyll – Internal Audit Report – LiveArgyll Establishment Visit – Kintyre Community Centre – July
2023 
Area Strengths Areas for Consideration
toilet. This is in good working order and is
clean.
14 Swimming
Pool
N/A N/A
15 Sports Hall,
Gym and
Studios
There is one room within the Centre that is
used as a sports hall, this appears to be dust
and damage free.
None
16 Libraries N/A N/A
17 Income
Collection
There are no vending machines or pay
phones within the Centre.
None
18 Booking of
Facilities
Booking of rooms is processed appropriately.  None
19 Floats Floats are checked on a daily basis by the
responsible person on duty.
None
20 Banking Banking is performed by the Senior Duty
Officer from the Aqualibrium via a night safe.
None 
Management Response
General Management note the findings.
Action has been taken as per the agreed property maintenance protocols in place with Argyll and
Bute Council partners.  Where matters are of more of an aesthetic nature these are deemed
commensurate with age and design of building. 
Appendix 1 – Establishment Visit Schedule 2023/24 
2022/23 2023/24 Complete
Leisure     
Aqualibrium √  √
Helensburgh Pool   √
Riverside Leisure Centre     √
Rothesay Leisure Pool     √
Mid Argyll Sports Centre   √ √
Libraries     
Campbeltown √  √
Dunoon    √
Helensburgh     √
Lochgilphead    √
Oban √  √
Rosneath     √
Rothesay     √
Halls & Community Centres     
Queens Hall, Dunoon     √
Victoria Hall, Campbeltown   √ √
Victoria Halls, Helensburgh     √

Page 5

5 
LiveArgyll – Internal Audit Report – LiveArgyll Establishment Visit – Kintyre Community Centre – July
2023
Corran Halls, Oban √  √
Kintyre Community Education Centre   √ √
Lochgilphead Community Centre   √ √
Moat Centre, Rothesay     √