Page 1

Argyll and Bute Council
Internal Audit Report
June 2023
Final 
High Medium Low VFM
Number of
Findings
0 0 1 0 
Risk Management
Audit Opinion: High

Page 2

2 
Argyll and Bute Council – Internal Audit Report – Risk Management, June 2023 
Contents 
1. Executive Summary .............................................................................................................. 3
Introduction................................................................................................................................. 3
Background.................................................................................................................................. 3
Scope........................................................................................................................................... 3
Risks ............................................................................................................................................ 3
Audit Opinion .............................................................................................................................. 4
Recommendations ....................................................................................................................... 4
2. Objectives and Summary Assessment.................................................................................... 4
3. Detailed Findings .................................................................................................................. 5
Appendix 1 – Action Plan.............................................................................................................. 7
Appendix 2 – Audit Opinion.......................................................................................................... 9 
Contact Details 
Internal Auditor: David Sullivan
Telephone:  01546 604125 
e-mail:   david.sullivan@argyll-bute.gov.uk 
www.argyll-bute.gov.uk

Page 3

3 
Argyll and Bute Council – Internal Audit Report – Risk Management, June 2023
1. Executive Summary
Introduction
1. As part of the 2023/24 internal audit plan, approved by the Audit & Scrutiny Committee in
March 2023, we have undertaken an audit of Argyll and Bute Council’s (the Council) system of
internal control and governance in relation to Risk Management.
2. The audit was conducted in accordance with the Public Sector Internal Audit Standards (PSIAS)
with our conclusions based on discussions with council officers and the information available at
the time the fieldwork was performed. The findings outlined in this report are only those which
have come to our attention during the course of our normal audit work and are not necessarily
all the issues which may exist. Appendix 1 to this report includes agreed actions to strengthen
internal control however it is the responsibility of management to determine the extent of the
internal control system appropriate to the Council.
3. The contents of this report have been agreed with the appropriate council officers to confirm
factual accuracy and appreciation is due for the cooperation and assistance received from all
officers over the course of the audit.
Background 
4. Local government has seen and will continue to see unprecedented changes. This will lead to
significant new risks, as the Council reviews its services and how they are delivered. Risk
management will support and enhance the decision making process, increase the likelihood of
the Council meeting its objectives and enable it to respond quickly to new pressures and
opportunities. 
5. Risk management is the planned and systematic process by which key risks are identified,
evaluated and managed so as to maximise benefits and minimise potentially negative
consequences to the Council and its partners. Risks are significant uncertainties that may affect
the Council’s ability to achieve its strategic and operational objectives. 
Scope 
6. The scope of the audit was to assess the adequacy of, and compliance with, the Council’s risk
management arrangements as outlined in the Terms of Reference.
Risks
7.  The risks considered throughout the audit were:
 CEU ORR 5: Risk management is not embedded as an integral part of decision making
process
 Audit Risk 1: Risk registers are not updated regularly
 Audit Risk 2: Risks are not properly assessed
 Audit Risk 3: Risks are not prioritised
 Audit Risk 4: Risks are not monitored and reported

Page 4

4 
Argyll and Bute Council – Internal Audit Report – Risk Management, June 2023
Audit Opinion
8. We provide an overall audit opinion for all the audits we conduct. This is based on our
judgement on the level of assurance which we can take over the established internal controls,
governance and management of risk as evidenced by our audit work.  Full details of the five
possible categories of audit opinion is provided in Appendix 2 to this report.
9. Our overall audit opinion for this audit is that we can take a High level of assurance.  This means
that, internal control, governance and the management of risk are at a high standard. Only
marginal elements of residual risk have been identified with these either being accepted or dealt
with. A sound system of control designed to achieve the system objectives is in place and being
applied consistently.
Recommendations
10. We have highlighted one low priority recommendation where we believe there is scope to
strengthen the control and governance environment. These are summarised below:
 A Copy of the Risk Management Manual on the HUB needs to be replaced with the
current version 
11. Full details of the audit findings, recommendations and management responses can be found in
Section 3 of this report and in the action plan at Appendix 1.
2. Objectives and Summary Assessment
12. Exhibit 1 sets out the control objectives identified during the planning phase of the audit and our
assessment against each objective. 
Exhibit 1 – Summary Assessment of Control Objectives 
Control Objective Link to Risk Assessment Summary Conclusion
CO1 Risk management is
actively supported
and promoted by
senior
officers/elected
members
ORR 5
Audit Risk 1
High In September 2019 the Audit and
Scrutiny Committee agreed that an
annual audit of risk management was
no longer required and that this
would be replaced by an annual
strategic risk assurance mapping
exercise with an audit of risk
management to be conducted at least
once every three years. Roles and
responsibilities are clearly set out and
arrangements for updating risk
registers have been defined and are
being adhered to. The current version
of the Risk Management Manual on
the HUB is out of date.
CO2 There is a
systematic
approach to identify
and prioritise risks
and match them
ORR 5
Audit Risk 2
Audit Risk 3 
High The Council’s Risk Management
Manual clearly set out a systematic
approach for identifying and
evaluating risks.

Page 5

5 
Argyll and Bute Council – Internal Audit Report – Risk Management, June 2023
with appropriate
responses
CO3 Risks and the action
taken to mitigate
them are regularly
monitored 
ORR 5
Audit Risk 4
High The Council’s risk registers are being
regularly reviewed and updated. 
13. Further details of our conclusions against each control objective can be found in Section 3 of this
report.  
3. Detailed Findings
Risk management is actively supported and promoted by senior officers/elected members
14. In September 2019 the Audit and Scrutiny Committee agreed that an annual audit of risk
management was no longer required and that this would be replaced by an annual strategic risk
assurance mapping exercise with an audit of risk management to be conducted at least once
every three years. The Risk Management Manual was updated to reflect this change with the
updated version being approved by the Strategic Management Team (SMT) in November 2020
and Policy and Resources (P&R) in May 2021.The annual risk assurance mapping was carried out
in August 2022 and presented to the September 2022 Audit and Scrutiny Committee. The
conclusion from the risk assurance mapping exercise was “ this exercise has again confirmed
that for the majority of risks in the Council’s strategic risk register there are either sufficient
assurances in place or internal audit have scheduled work to fill identified gaps. “ 
15. The current Risk Management Manual is comprehensive and sets out:
 a definition of risk
 the Council’s approach to managing risk
 a risk appetite statement
 roles and responsibilities including senior management and elected members
 the risk management cycle detailing the stages to undertake to manage risk. 
16. The roles and responsibilities of senior management are clearly outlined within the Council Risk
Management Manual under “Roles and Responsibilities Section” in regard to:
 strategic Management Team
 elected Members
 heads of Service
 managers
 employees
 audit and Scrutiny Committee
 Internal Audit. 
17. The Council’s Head of Financial Services has operational responsibility for risk management
(excluding social care).  
18. The operational risk registers (ORR’s) are agreed on a quarterly basis at Departmental
Management Team (DMT) meetings and the strategic risk registers (SRR’s) are formally reviewed
and updated by SMT on a six monthly basis.

Page 6

6 
Argyll and Bute Council – Internal Audit Report – Risk Management, June 2023
19. The Risk Management Manual currently on the HUB reflects a previous version.
Action Plan 1
There is a systematic approach to identify and prioritise risks and match them with appropriate
responses
20. The Council’s Risk Management Manual sets out a comprehensive process to identify and
prioritise risks. In particular how to:
 identify risk
 assess the likelihood and impact of the risk
 prioritise risks (red, amber or green)
 mitigate and manage the risk.
21. All business activities within the Council have a risk assessment. These are identified within each
departments operational risk register. A review of the ORR’s confirmed that risk management is
applied to all Council business activities. 
22. A review of the Council’s risk registers (both SRR and ORR) confirmed that risks have been
assessed and prioritised and mitigating action identified where a decision has been taken to
treat the risk. 
Risks and the action taken to mitigate them are regularly monitored
23. Minutes of the SMT and the three Council Departmental Management Teams confirm that risk
registers are being reviewed and updated as per the requirements established by the Risk
Management Manual. In addition it is clear the reporting arrangements are being adhered to.
Furthermore the Head of Financial Services updates P&R on the Council’s key financial risks as a
standard agenda item. 
24. A review of the Council’s risk registers confirmed that risks have been assessed and prioritised
and mitigating action identified where a decision has been taken to treat the risk. 
25. The Council’s Strategic Risk register is reviewed every 6 months and agreed by the Council’s
Strategic Management Team and presented to the Audit and Scrutiny Committee by the CIA
annually. The next scheduled review will commence in June 2023 with reporting to the Audit and
Scrutiny Committee in September 2023.

Page 7

Appendix 1 – Action Plan 
No Finding Risk Agreed Action Responsibility / Due Date
Low 1
Risk Management Manual 
The Risk Management Manual on the HUB reflects a
previous version. 
Risk management does not
reflect current practice
To inform IT to update the HUB
with most recent version of the
Risk Management Manual.
Chief Internal Auditor 
June 2023

Page 8

8 
Argyll and Bute Council – Internal Audit Report – Risk Management, June 2023
In order to assist management in using our reports a system of grading audit findings has been adopted to allow the significance of findings to be ascertained.  The definitions
of each classification are as follows: 
Grading    Definition
High  A major observation on high level controls and other important internal controls or a significant matter relating to the critical success of the
objectives of the system.  The weakness may therefore give rise to loss or error. 
Medium 
Observations on less significant internal controls and/or improvements to the efficiency and effectiveness of controls which will assist in meeting
the objectives of the system.  The weakness is not necessarily substantial however the risk of error would be significantly reduced if corrective
action was taken.  
Low  Minor recommendations to improve the efficiency and effectiveness of controls or an isolated issue subsequently corrected.  The weakness does
not appear to significantly affect the ability of the system to meet its objectives. 
VFM  An observation which does not highlight an issue relating to internal controls but represents a possible opportunity for the council to achieve
better value for money (VFM).

Page 9

9 
Argyll and Bute Council – Internal Audit Report – Risk Management, June 2023
Appendix 2 – Audit Opinion 
Level of Assurance  Definition 
High 
Internal control, governance and the management of risk are at a high standard. Only marginal elements of residual risk have
been identified with these either being accepted or dealt with. A sound system of control designed to achieve the system
objectives is in place and being applied consistently. 
Substantial 
Internal control, governance and the management of risk is sound. However, there are minor areas of weakness which put some
system objectives at risk and specific elements of residual risk that are slightly above an acceptable level and need to be
addressed within a reasonable timescale. 
Reasonable 
Internal control, governance and the management of risk are broadly reliable. However, whilst not displaying a general trend,
there are areas of concern which have been identified where elements of residual risk or weakness may put some of the system
objectives at risk. 
Limited 
Internal control, governance and the management of risk are displaying a general trend of unacceptable residual risk above an
acceptable level and placing system objectives are at risk. Weakness must be addressed with a reasonable timescale with
management allocating appropriate resources to the issues raised. 
No Assurance 
Internal control, governance and the management of risk is poor. Significant residual risk and/or significant non-compliance with
basic controls exists leaving the system open to error, loss or abuse. Residual risk must be addressed immediately with
management allocating appropriate resources to the issues.