Internal Audit_final audit report_Oban Airport_23-24

Argyll and Bute Council · 19 December 2023
Back to Audit and Scrutiny Committee — 19 December 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council
Internal Audit Report
September 2023
Final 
High Medium Low VFM
Number of Findings 0 0 0  0 
Oban Airport
Audit Opinion: High

Page 2

2 
Argyll and Bute Council – Internal Audit Report – Oban Airport, September 2023 
Contents 
1. Executive Summary ........................................................................................................................ 3
Introduction ............................................................................................................................................ 3
Background ............................................................................................................................................. 3
Scope ....................................................................................................................................................... 4
Audit Opinion ......................................................................................................................................... 4
2. Objectives and Summary Assessment ........................................................................................... 4
3. Detailed Findings ............................................................................................................................ 6
Appendix 1 – Action Plan ....................................................................................................................... 8
Appendix 2 – Audit Opinion ................................................................................................................... 9 
Contact Details 
Internal Auditor: Leanne Rennie 
Telephone:  01369 708516 
e-mail:   Leanne.rennie@argyll-bute.gov.uk 
www.argyll-bute.gov.uk

Page 3

3 
Argyll and Bute Council – Internal Audit Report – Oban Airport, September 2023
1. Executive Summary
Introduction
1. As part of the 2023/24 internal audit plan, approved by the Audit & Scrutiny Committee in
March 2023, we have undertaken an audit of Argyll and Bute Council’s (the Council) system of
internal control and governance in relation to Oban Airport.
2. The audit was conducted in accordance with the Public Sector Internal Audit Standards (PSIAS)
with our conclusions based on discussions with council officers and the information available at
the time the fieldwork was performed. The findings outlined in this report are only those which
have come to our attention during the course of our normal audit work and are not necessarily
all the issues which may exist. If necessary, Appendix 1 to this report includes agreed actions to
strengthen internal control however it is the responsibility of management to determine the
extent of the internal control system appropriate to the Council.
3. The contents of this report have been agreed with the appropriate council officers to confirm
factual accuracy and appreciation is due for the cooperation and assistance received from all
officers over the course of the audit.
Background
4. Oban Airport is one of three aerodromes operated by the Council, and licensed under Article 211
of the ANO 2009 by the Civil Aviation Authority (CAA). Deemed as a Public Service Obligation
(PSO), scheduled services, and scholar flights for island school children, operate from Oban
airport to Coll, Colonsay, Islay and Tiree. Additionally, the airport deals with chartered traffic and
military flights as well as general aviation traffic such as medevacs, coastguard operations,
training flights and scenic tours by private operators. 
5. Prior to the grant of a licence and for continued licensing, the CAA requires the Aerodrome
Operator to meet the minimum standards detailed in CAP168 Licensing of Aerodromes. CAP 168
sets out the standards required at UK national licensed aerodromes relating to management
systems, operational procedures, physical characteristics, assessment and treatment of
obstacles, visual aids, rescue and fire-fighting services and medical services. 
6. The Oban Airport Aerodrome Manual (the Manual) provides information about the airport, its
systems for managing safety and the required operational procedures.  The Airport Rescue &
Fire Fighting Service (RFFS) manual provides guidance on the agreed policy and procedures
designed to achieve an effective and efficient RFFS. Both manuals are derived from CAP168.
7. Oban Airport operate the ‘Redkite Equipment Management system’ which is used in all UK
airports to help ensure they meet the requirements of the CAA in regard to RFFS personnel and
equipment.
8. The overall remit of internal audit is to provide assurance over compliance with the 22 airport
operating instructions (AOIs) established by the Manual and the further procedures established
by the RFFS manual.

Page 4

4 
Argyll and Bute Council – Internal Audit Report – Oban Airport, September 2023
Scope 
9. The scope of the audit was to provide assurance over compliance with five of the airport
operating instructions (AOIs) established by the Manual and the further procedures established
by the RFFS manual as outlined in the Terms of Reference agreed with the Oban Airport Station
Manager on 18 August 2023. The operating instructions audited in September 2023 were:
 AOI 6 – Foreign Object Debris/Foreign Object Damage (FOD)
 AOI 7 – Airfield Facilities and Infrastructure
 AOI 8 – Aerodrome Ground Lighting
 AOI 9 – Airside Snow and De-Icing Plans
 AOI 10 – Aerodrome Wildlife Hazard Management Plans 
Risks
10.  The risks considered throughout the audit were:
 Audit Risk 1: Failure to comply with operating instructions could result in increased risk
of accidents and/or the airport losing its CAA licence
Audit Opinion
11. We provide an overall audit opinion for all the audits we conduct. This is based on our
judgement on the level of assurance which we can take over the established internal controls,
governance and management of risk as evidenced by our audit work.  Full details of the five
possible categories of audit opinion is provided in Appendix 2 to this report.
12. Our overall audit opinion for this audit is that we can take a high level of assurance. This means
that internal control, governance and the management of risk are at a high standard. Only
marginal elements of residual risk have been identified with these either being accepted or dealt
with. A sound system of control designed to achieve the system objectives is in place and being
applied consistently.
2. Objectives and Summary Assessment
13. Exhibit 1 sets out the control objectives identified during the planning phase of the audit and our
assessment against each objective. 
Exhibit 1 – Summary Assessment of Control Objectives 
Control Objective Link to
Risk
Assessment Summary Conclusion
CO1 The Manual, setting out the
operational procedures of the
airport, is up to date, appropriate
and accessible to all relevant
staff.
Audit
Risk 1
High The Manual is updated
annually and is available to
appropriate officers. The
document was found to be
comprehensive with each
section outlining the Council

Page 5

5 
Argyll and Bute Council – Internal Audit Report – Oban Airport, September 2023 
Control Objective Link to
Risk
Assessment Summary Conclusion
policy for compliance with
regulations and procedures. 
CO2 AOI6 – Ensure cleanliness &
sweeping of the movement area
of the Airport
Audit
Risk 1
High The removal of foreign
object debris to avoid
damage is the responsibility
of all aerodrome staff.
Inspections and sweeping of
the movement area is
performed twice daily and
recorded on the navigator
system accordingly. The
FODBOSS equipment is
inspected before every use.
Training is provided as part
of a presentation to all
airside users. 
CO3 AOI7 – Ensure inspections of
airfield facilities and
infrastructure are adhered to as
part of safety management
Audit
Risk 1
High Inspections of the airfield,
movement area and runway
are carried out twice daily. 
Additional inspections are
carried out at a higher level
and recorded on the airport
navigator system as well as
Redkite. 
Runway friction levels are
also inspected by an
external body on an annual
basis. 
CO4 AOI8 – Ensure Aerodrome
Ground Lighting guidance is
followed
Audit
Risk 1
High Aerodrome Ground Lighting
(AGL) is not a licensing
requirement at the airport,
however, it is airport policy
to follow the guidance
stated in CAP168 with
regards to inspections,
maintenance and cleaning. 
Lighting inspections are
carried out and recorded
accordingly. Signs and
markings are also inspected
and recorded. Faults and
maintenance are carried out
by the same external body
as mentioned above in CO3. 
CO5 AOI9 – Ensure snow and de-icing
plans are in place
Audit
Risk 1
High There are no instructions to
follow regarding snow and
ice. The airport would
generally close in this
instance.  In the event of a

Page 6

6 
Argyll and Bute Council – Internal Audit Report – Oban Airport, September 2023 
Control Objective Link to
Risk
Assessment Summary Conclusion
light dusting of snow then
hard brushes and
Tracmaster snow brushes
can be used. Hazards signs
have been installed on the
outside of the building and
these illuminate when the
temperature reaches 2
degrees or below to warn of
potential hazards. 
CO6 AOI10 – Ensure plans are in place
and records are kept regarding
wildlife hazard management 
Audit
Risk 1
High The airport adhere to
CAP772 regarding the
wildlife control plan. 
Bird and wildlife control is
recorded twice a day.
Inspections are performed. 
Machinery and props are
used to minimise the impact
of wildlife on the Airport. 
14. Further details of our conclusions against each control objective can be found in Section 3 of this
report.  
3. Detailed Findings
The Manual, setting out the operational procedures of the airport, is up to date, appropriate and
accessible to all relevant staff
15. The Manual is available to all relevant personnel on the Council HUB with a hard copy held
onsite at the airport. Each section within the Manual sets out:
 the Council’s policy and established procedures to ensure compliance with relevant rules
and/or regulations 
 appropriate monitoring arrangements (where applicable)
 roles and responsibilities of relevant personnel.
16. The Manual is reviewed annually by the Station Manager, last updated in August 2023.  The
updated version is submitted to the CAA who have 28 days to highlight any queries on the
Manual’s content. If no response is received in 28 days then the revised Manual is adopted.  
17. In June 2020, in response to COVID, a guidance manual entitled ‘Oban & the Isles Airports –
COVID secure procedures’ was issued by the Station Manager. It is available on the Council HUB
and paper copies are kept in the office.
The airport complies with the operating instructions regarding cleanliness and sweeping around the
movement are of the Airport.
18. The Manual states that all FOD (Foreign Object Debris/Foreign Object Damage) must be
removed and discarded accordingly, using the appropriate equipment.

Page 7

7 
Argyll and Bute Council – Internal Audit Report – Oban Airport, September 2023
The airport complies with the operating instructions to inspect and monitor airfield facilities. 
19. The Manual states that daily inspections are carried out of the airfield facilities and
infrastructure. Movement areas around the airside are inspected and recorded accordingly. 
The Airport complies with the operating instructions regarding visual aids. 
20. Aerodrome Ground Lighting (AGL) is not a licensing requirement however it is the airports policy
to follow CAP168 guidance with regards to inspections, maintenance and cleaning of visual aids.
Faults and inspections are carried out by an external body and recordings are kept accordingly.
The cleaning of the AGL ties in with the maintenance of the airport and is carried out on a
monthly basis. 
The airport complies with the operating instructions regarding snow and de-icing plans. 
21. There are no instructions for snow or de-icing. In the event of snow the airport generally closes
as this can cause hazardous conditions. Light snow or ice would be dealt with using hard brushes
or the Tracmaster snow brush. 
The airport complies with the instructions regarding wildlife control.
22.  The Manual states that the airport must adhere to CAP772 regarding wildlife control plans. 
There are regular bird runs and inspections and this is recorded twice a day. Machinery and props
are used to minimise the impact of wildlife on the Airport. Figures of bird strikes and any birds that
are disposed of is reported to the CAA on an annual basis.

Page 8

Appendix 1 – Action Plan
In order to assist management in using our reports a system of grading audit findings has been adopted to allow the significance of findings to be
ascertained. The definitions of each classification are as follows: 
Grading    Definition
High  A major observation on high level controls and other important internal controls or a significant matter relating to the critical success of the
objectives of the system.  The weakness may therefore give rise to loss or error. 
Medium 
Observations on less significant internal controls and/or improvements to the efficiency and effectiveness of controls which will assist in meeting
the objectives of the system.  The weakness is not necessarily substantial however the risk of error would be significantly reduced if corrective
action was taken.  
Low  Minor recommendations to improve the efficiency and effectiveness of controls or an isolated issue subsequently corrected.  The weakness does
not appear to significantly affect the ability of the system to meet its objectives. 
VFM  An observation which does not highlight an issue relating to internal controls but represents a possible opportunity for the council to achieve
better value for money (VFM).

Page 9

9 
Argyll and Bute Council – Internal Audit Report – Oban Airport, September 2023
Appendix 2 – Audit Opinion 
Level of Assurance  Definition 
High 
Internal control, governance and the management of risk are at a high standard. Only marginal elements of residual risk have
been identified with these either being accepted or dealt with. A sound system of control designed to achieve the system
objectives is in place and being applied consistently. 
Substantial 
Internal control, governance and the management of risk is sound. However, there are minor areas of weakness which put some
system objectives at risk and specific elements of residual risk that are slightly above an acceptable level and need to be
addressed within a reasonable timescale. 
Reasonable 
Internal control, governance and the management of risk are broadly reliable. However, whilst not displaying a general trend,
there are areas of concern which have been identified where elements of residual risk or weakness may put some of the system
objectives at risk. 
Limited 
Internal control, governance and the management of risk are displaying a general trend of unacceptable residual risk above an
acceptable level and placing system objectives are at risk. Weakness must be addressed with a reasonable timescale with
management allocating appropriate resources to the issues raised. 
No Assurance 
Internal control, governance and the management of risk is poor. Significant residual risk and/or significant non-compliance with
basic controls exists leaving the system open to error, loss or abuse. Residual risk must be addressed immediately with
management allocating appropriate resources to the issues.