Page 1

Draft Annual Audit Report
Argyll and Bute Council – Year
ended 31 March 2023
March 2024

Page 2

Contents
01 Executive summary
02 Status of the audit
03 Audit approach
04 Significant findings
05 Internal control recommendations
06 Summary of misstatements
07 Wider scope
08 Best Value
Appendix A: Draft management representation letter
Appendix B: Draft audit report
Appendix C: Independence
Appendix D: Other communications
Appendix E: Wider scope and Best Value ratings
Our reports are prepared in accordance with Terms of Appointment Letter from Audit Scotland dated 18 May 2022 through which the Accounts Commission has appointed us as
external auditor of Argyll and Bute Council (the Council) for financial years 2022/23 to 2026/27. We undertake our audit in accordance with Part VII of the Local Government (Scotland)
Act 1973, as amended; and our responsibilities as set out within Audit Scotland’s Code of Audit Practice 2021.
Reports and letters prepared by appointed auditors and addressed to the Council are prepared for the sole use of the Council and made available to Audit Scotland, the Accounts
Commission and the Controller of Audit. We take no responsibility to any member or officer in their individual capacity or to any other third party.
Mazars LLP is the UK firm of Mazars, an international advisory and accountancy group. Mazars LLP is registered by the Institute of Chartered Accountants in England and Wales.
2

Page 3

01 March 2024
Argyll and Bute Council
Lochgilphead
Argyll
PA31 8RT
Dear Committee Members and Controller of Audit,
Annual Audit Report – Year ended 31 March 2023
We are pleased to present our Annual Audit Report for the year ended 31 March 2023. The purpose of this document is to summarise our audit conclusions and findings from our
considerations of the wider scope audit specified in the Code of Audit Practice 2021 namely, financial management; financial sustainability; vision, leadership and governance; and use of
resources to improve outcomes.
The scope of our work, including identified significant audit risks and other areas of management judgement, was outlined in our Audit Strategy Memorandum which we presented on 3
May 2023 to the Audit Committee. We have reviewed our Audit Strategy Memorandum and concluded that the original significant audit risks and other areas of management judgement
remain appropriate.
We would like to express our thanks for the assistance of the Council’s team during our audit.
If you would like to discuss any matters in more detail then please do not hesitate to contact me on 07813752053.
Yours faithfully
Cameron Waddell (Partner)
Mazars LLP
Mazars LLP – 26 Mosley Street – Newcastle upon Tyne – NE1 1DF
Tel: 0141 227 2400 – www.mazars.co.uk
Mazars LLP is the UK firm of Mazars, an integrated international advisory and accountancy organisation. Mazars LLP is a limited liability partnership registered in England and Wales with
registered number OC308299 and with its registered office at 30 Old Bailey, London EC4M 7AU.
We are registered to carry on audit work in the UK by the Institute of Chartered Accountants in England and Wales. Details about our audit registration can be viewed at
www.auditregister.org.uk under reference number C001139861. VAT number: 839 8356 73
Mazars LLP
26 Mosley Street
Newcastle upon Tyne
NE1 1DF

Page 4

Section 01:
Executive summary

Page 5

1. Executive summary
Audit conclusions and significant findings
The detailed scope of our work as your appointed auditor for 2022/23 is set out in the Audit
Scotland’s Code of Audit Practice 2021. Our responsibilities and powers are derived from
Part VII of the Local Government (Scotland) Act 1973 and, as outlined in our Audit Strategy
Memorandum, our audit has been conducted in accordance with International Standards on
Auditing (UK) and means we focus on audit risks that we have assessed as resulting in a
higher risk of material misstatement.
In section 4 of this report we have set out our conclusions and significant findings from our
audit. This section includes our conclusions on the audit risks and areas of management
judgement in our Audit Strategy Memorandum, which include:
• Management override of Controls
• Valuation of the net defined benefit liability
• Valuation of property, plant and equipment
• Accounting for PFI and PPP contracts
• IT system change
Misstatements and internal control recommendations
Section 5 sets out internal control recommendations and section 6 sets out audit
misstatements. Section 7 outlines our work on the Council’s arrangements to achieve
economy, efficiency and effectiveness in its use of resources.
Status and audit opinion
We have substantially completed our audit in respect of the financial statements for the
year ended 31 March 2023. At the time of preparing this report, some matters remain
outstanding as outlined in section 2. We will provide an update to you in relation to the
matters outstanding through issuance of a follow up letter.
Conclusions from our audit testing and audit opinion
We have concluded our audit in respect of the financial statements for the year ended 31
March 2023. Based on our audit work completed to date we have the following
conclusions:
Audit opinion
We expect to issue an unqualified opinion, without modification, on the
financial statements. Our proposed audit opinion is included in the draft
auditor’s report in Appendix B.
Matters on which we report by exception
We are required by to report to you if, during the course of our audit, we
have found that adequate accounting records have not been kept; the
financial statements and the audited part of the Remuneration Report are
not in agreement with the accounting records; or we have not received all
the information and explanations we require for our audit.
We have nothing to report in respect of these matters.
Governance Statement
We are required to report on whether the information given in the Annual
Governance Statement is materially inconsistent with the financial
statements; has not been properly prepared in accordance with the
Delivering Good Governance in Local Government Framework 2016; or is
materially misstated.
We have no matters to report in respect of the Annual Governance
Statement.
5

Page 6

1. Executive summary (continued)
Conclusions from our audit testing and audit opinion (continued)
Other information
We are required to report on whether the other information (comprising of 
Management’s Commentary, Statement of Responsibilities and the unaudited parts of
the Remuneration Report), is materially inconsistent with the financial statements; has
not been properly prepared in accordance with statutory guidance issued under the
Local Government in Scotland Act 2003; or is materially misstated.
No inconsistencies have been identified and we are proposing to issue an unmodified
opinion in this respect.
Whole of Government Accounts (WGA)
The Council is below the threshold for auditor assurance set by the Scottish
Government for all public bodies in Scotland. We are therefore not required to perform
any examination of the Council’s WGA return.
Wider powers
Section 101 of the Local Government (Scotland) Act 1973 requires us to give any
person interested, the opportunity to question us about the accounting records of the
Council and to consider any objection made to the accounts. We did not receive any
such correspondence from electors.
6

Page 7

1. Executive summary (continued)
Best Value and Wider Scope conclusions
As auditors appointed by the Accounts Commission, our wider scope responsibilities are
set out in the Audit Scotland’s Code of Audit Practice 2021 and sits alongside Best Value
requirements detailed the Local Government (Scotland) Act 1973. The Code requirements
broaden the scope of the 2022/23 audit and allows us to use a risk-based approach to
report on our consideration of the Council’s performance of Best Value and community
planning duties and make recommendations for improvement and, where appropriate,
conclude on the Council’s performance.
The Code’s wider scope framework is categorised into four areas:
• financial management;
• financial sustainability;
• vision, leadership and governance; and
• use of resources to improve outcomes.
It remains the responsibility of the Council to ensure that it makes proper financial
stewardship of public funds, complies with relevant legislation, and establishes effective
governance of their activities. The Council is also responsible for ensuring that they
establish arrangements to secure continuous improvement in performance and, in making
those arrangements, ensure resources are being used to improve strategic outcomes and
demonstrate the economy, efficiency, and effectiveness throughout the use of its
resources. These arrangements should be proportionate to the size and type of the
Council, appropriate to the nature of the Council and the services and functions that it has
been created to deliver.
Wider Scope
We have not identified any risks in arrangements to report in relation
to the financial management; financial sustainability; vision,
leadership and governance; and use of resources to improve
outcomes arrangements that the Council has in place. 
Further detail on our Wider Scope work is provided in section 7 of this
report.
Best Value
We have not identified any risks to report in relation to the
arrangements that the Council has in place to secure economy,
efficiency and effectiveness in its use of resources. 
Further detail on our Best Value work is provided in section 8 of this
report including any significant risks identified.
7

Page 8

Section 02:
Status of the audit
8

Page 9

2. Status of the audit
Our work is substantially complete and there are currently no matters of which we are aware that would require modification of our audit opinion, subject to the outstanding
matters detailed below.
High - Likely to result in material
adjustment or significant change to
disclosures within the financial statements.
Medium - Potential to result in material
adjustment or significant change to
disclosures within the financial statements.
Low - Not considered likely to result in
material adjustment or change to
disclosures within the financial statements.
Audit area Risk of material adjustment or
significant change Description of the outstanding matters
Audit quality control
and completion
procedures
Medium
Completion of Manager and Partner review and our quality control processes in
respect of the audit. Review of post balance sheet events up to the point at
which we sign our audit report.
Annual report and
accounts and letter of
representation
Low We will complete our final review of the annual report and accounts upon receipt
of the final signed version of the accounts and letter of representation.
Trust Accounts Low We are still performing procedures in regard to the Trust’s audit. We plan to
complete the Trust’s Audit within March 2024.
Property, Plant and
Equipment Valuation Low We are finalising our work in this area
Income Cut Off Low We are finalising our work in this area
Expenses Cut Off Low We are finalising our work in this area
Loans and borrowings Low We are finalising our work in this area
Grant Income Low We are finalising our work in this area
9

Page 10

Section 03:
Audit approach
10

Page 11

3. Audit approach
Changes to our audit approach
We provided details of our intended audit approach in our Audit Strategy Memorandum in
May 2023. We have not made any changes to our audit approach since we presented our
Audit Strategy Memorandum.
Materiality
Our provisional materiality at the planning stage of the audit was set at £8.907m for the
Council and £8.997m for its group using a benchmark of 2% of gross revenue expenditure
at surplus/deficit level. Our final assessment of materiality, based on the final financial
statements, is £9.529m for the Council and £9.665m for the group using the same
benchmark.
We set a clearly trivial level at the planning stage of the audit of £267k for the Council and
£269k for the group. We have capped this at £250k to comply with the maximum threshold
allowed by Audit Scotland.
Use of experts
We used our experts to assist us in obtaining sufficient appropriate audit evidence in
relation to specific areas of the accounts. In addition to the experts listed in our Audit
Strategy Memorandum, we used Mazars’ Real Estate Valuation Team to review the
Council’s valuation methodology on DRC and EUV assets, consider  the Council’s non-
revalued assets methodology on DRC assets and review the Council's approach to non-
revalued EUV assets.
Charitable Trusts
At the planning stage of the audit, we set separate materialities for each of the charitable
trusts. We have reviewed our methodology and set a single materiality to reflect that the
charitable trusts financial statements are covered by a single audit opinion. Our provisional
materiality at the planning stage of the audit was set at £15,500. Our final assessment of
materiality, based on the final financial statements, is £15,359 using the same benchmark.
We have provided our consideration of our independence as part of the Council
engagement and Charitable Trust engagement in Appendix C.
11

Page 12

3. Audit approach (continued)
Group audit approach
Full audit
Performance of an audit of the component’s
financial information prepared for group
reporting purposes using component
materiality
Audit of balances and/or disclosures
Performance of an audit of specific
balances and/or disclosures included in the
component’s financial information prepared
for group reporting purposes, using
component materiality
Specific audit procedures
Performance of specific audit procedures
on the component’s financial information
Review procedures
Review of the component’s financial
information prepared for group reporting
purposes using the component materiality
assigned
Group component Approach adopted Key points or other matters to report
Argyll and Bute Integration Joint Board Desktop review procedures No key points to report
Dunbartonshire and Argyll & Bute Valuation Joint
Board Desktop review procedures No key points to report
Strathclyde Partnership for Transport Desktop review procedures Consolidation basis challenged and
amended
Strathclyde Concessionary Travel Scheme Joint
Committee Desktop review procedures Consolidation basis challenged and
amended
Live Argyll
Audit of one or more account
balances, classes of
transactions or disclosures. i.e.
pensions related transactions,
balances and disclosures.
Assurances were not received from the
Strathclyde Pension Fund auditor in
relation to Live Argyll’s pension figures,
leading to the audit team needing to
perform alternative procedures. .
Common Good Accounts for the former Burghs
of Oban, Campbeltown, Rothesay, Dunoon,
Lochgilphead, Inveraray, Cove and Kilcreggan
Desktop review procedures No key points to report
12

Page 13

Section 04:
Significant findings
13

Page 14

4. Significant findings
In this section we outline the significant findings from our audit. These findings include:
• our audit conclusions regarding other significant risks and key areas of management
judgement outlined in the Audit Strategy Memorandum;
• our comments in respect of the accounting policies and disclosures that you have
adopted in the financial statements. On page 19 we have concluded whether the
financial statements have been prepared in accordance with the financial reporting
framework and commented on any significant accounting policy changes that have been
made during the year;
• any further significant matters discussed with management; and
• any significant difficulties we experienced during the audit.
Significant risks
Management
override of
controls
(Council and
Charitable
Trusts)
Description of the risk
Management at various levels within an organisation are in a
unique position to perpetrate fraud because of their ability to
manipulate accounting records and prepare fraudulent financial
statements by overriding controls that otherwise appear to be
operating effectively. Due to the unpredictable way in which such
override could occur there is a risk of material misstatement due
to fraud on all audits.
- How we addressed this risk
We addressed this risk through:
• Reviewing the key areas of the financial statements where
management has used judgement and estimation techniques
and considering whether there is evidence of unfair bias;
• Testing the appropriateness of journal entries recorded in the
general ledger and other adjustments made in preparing the
financial statements; and
• Considering and testing any significant transactions outside
the normal course of business or otherwise unusual.
- Audit conclusion
Our work has provided the assurance we sought in each of these
areas and as at the time of this report has not highlighted any
material issues to bring to your attention.
14

Page 15

4. Significant findings (continued)
Valuation of property, plant
and equipment
Description of the risk
The Council held land and buildings (including council dwellings) with a net book value of £415 million at 31 March 2022, and £451 million at 31 March 2023. The Council has adopted a
rolling revaluation model which sees other land and buildings revalued over a five-year cycle. This may result in individual assets not being revalued for several years. This creates a risk that
the carrying value of those assets that have been revalued in year is materially different from the year end fair value.
Valuations are based on specialist and management assumptions and changes in these can result in material changes to valuations. Due to the high degree of estimation uncertainty
associated with valuations, we have determined there is a significant risk in this area.
How we addressed this risk
We addressed this risk through:
• Assessing the scope and terms of engagement with the in-house Valuer;
• Assessing the competence, skills and objectivity of the in-house Valuer;
• Assessing how management use the in-house Valuer’s report to value land and buildings included in the financial statements;
• Testing the accuracy of the data used in valuations;
• Challenging the Council and in-house Valuer’s assumptions and judgements applied in the valuations;
• Reviewing the valuation methodology used, including the appropriateness of the valuation basis; and
• Considering the reasonableness of the valuation by comparing the valuation output with market intelligence.
• Testing a sample of revaluations in the year, by agreeing the revaluations recorded in the Annual Accounts to the in-house valuer’s reports. As part of this testing, we have confirmed that
the movements have been accounted for in accordance with the Code.
• Challenging management’s assessment for those assets not subject to valuation in the year and consulted with our internal property experts.
• For those valued on Existing Use Value on a market comparable basis, our property experts assisted us in checking market movements and confirmed immaterial potential movement for
2022/23.
• For those valued on a Depreciated Replacement Cost basis, which would be impacted by changes in build costs during the year, we tested management’s analysis of changes in the Build
Costs Information Service (BCIS) index with no exceptions noted.
We engaged the Mazars Real Estate Valuation Team to assist us with the above.
Audit conclusion
Except for the work highlighted in section 2 of this report, our work in this area is substantially complete, and we do not expect to report any material issues for your attention. We note that
there was robust discussion with management and additional audit effort on assumptions around assets not revalued in the year measured at Existing Use Value, in arriving at this
conclusion.
15

Page 16

16
4. Significant findings (continued)
Valuation of the net defined
benefit liability/surplus
Description of the risk
The Council had a net defined benefit surplus of £4.6 million at 31 March 2022, and a net defined benefit surplus of £232 million in the unaudited
accounts at 31 March 2023. Estimation of the net pension asset or liability depends on several complex judgements which are sensitive to
changes. These include the discount rate used, the rate at which salaries are predicted to increase, inflation rates and life expectancy. Due to
the high degree of estimation uncertainty associated with the valuations, we have determined there is a significant risk in this area.
How we addressed this risk
We addressed this risk through:
• reviewing the controls that the Council has in place over the information sent to the Scheme Actuary by the fund administrators (Strathclyde
Pension Fund).
• assessing the skill, competence and experience of the Fund’s actuary;
• challenging the reasonableness of the assumptions used by the actuary as part of the annual IAS 19 valuation. We for example challenged
the basis for the computation of asset ceiling used by the actuary in terms of the time horizon of funding applied to the Council in computing
the present value of past service contributions, leading to a revision in time horizon applied in the computation from the initial 12 years to
indefinite period/perpetuity. This resulted in the Council revising its pension asset down to £139.014m from the £232m in the unaudited
accounts for 2022/23.
• carrying out a range of substantive procedures on relevant information and cash flows used by the actuary as part of the annual IAS 19
valuation;
• Obtaining assurance from the auditor of the pension fund over the controls for providing accurate data to the actuary. In this regard, we noted
from the assurance received a net understatement error in pension assets, which when applied to the Council based on a proportion of
council’s pension assets to total pension fund assets resulted in an estimated unadjusted error/understatement of pension assets of £2.417m.
See Section 6.
• Assessing the reasonableness of the Council’s share of the total assets of the scheme with the Pension Fund Annual Accounts;
Audit conclusion
Our work has provided the assurance we sought in each of these areas and as at the time of this report has not highlighted any material
unadjusted issues to bring to your attention. We note that there was robust discussion with management and additional audit effort on
assumptions around the value of pension assets recognised in the financial statements. Subsequently management passed audit adjustments to
the financial statements in respect of revised asset ceilings, see Section 6.

Page 17

4. Significant findings (continued)
Key areas of management judgement and enhanced risk
17
Accounting for PFI and PPP
contracts
Description of the risk
The Council currently operates three Private Finance Initiative (PFI), or similar, contracts which are accounted for as Service Concession
arrangements under IFRIC12 – Service Concession Arrangements. The Council has determined that in the case of the Schools NPDO
contract and the new Schools DBFM contract, the Council has control over the services provided through use of the schools and
that a qualifying asset has been created. Therefore, the assets are included on the Council’s Balance Sheet along with a finance lease
liability.
The Council also operates a Waste Management PPP contract. In this case the Council determined that a “qualifying asset” has not
been created and that the Council does not have significant control over the services being provided. Therefore, the asset has not been
included on the Council’s Balance Sheet and payments to the contractor are charged to the appropriate service line within the
Comprehensive Income and Expenditure Account.
The method of accounting for PFI and PP assets can be complex and involves management judgement as set out in Note 3 to the
financial statements. Therefore, there is a potential risk of material misstatement if the Council fails to appropriately account for these
assets.
How we addressed this risk
We addressed this risk through reviewing the Council’s adopted approach for accounting for its PFI and PPP schemes.
Audit conclusion
Our work has provided the assurance we sought in each of these areas and as at the time of this report has not highlighted any material
unadjusted issues to bring to your attention

Page 18

4. Significant findings (continued)
Key areas of management judgement and enhanced risk
18
IT system change Description of the risk
During the year, the Council changed its core financial accounting system to Oracle Fusion. At the time of implementation, the Council undertook
detailed mapping and matching exercises to ensure that 2021/22 balances and 2022/23 transactions were accurately and completely transferred
from the old to the new system.
How we addressed this risk
We undertook a high-level assessment of the data migration governance to address the completeness and accuracy of the system
implementation. As part of our work we undertook sample testing of balances being transferred between the systems to ensure their
completeness and accuracy.
Audit conclusion
Our work has provided the assurance we sought in each of these areas and as at the time of this report has not highlighted any material
unadjusted issues to bring to your attention

Page 19

4. Significant findings (continued)
Qualitative aspects of the Council’s accounting practices
We have reviewed the Council’s accounting policies and disclosures and concluded they
comply with the CIPFA/LASAAC Code of Practice on Local Authority Accounting in the
United Kingdom 2022/23, as amended by the Update to the Code and Specifications for
Future Codes for Infrastructure Assets, published in November 2022, appropriately tailored
to the Council’s circumstances.
The unaudited annual report and accounts were received from the Council and were of a
good quality.
Significant matters discussed with management
During our audit we communicated the following significant matters to management:
• First year audit procedures. Auditing standards require us to carry out additional
specific procedures for the first year of an audit. These include: seeking professional
clearance confirmations from the predecessor auditor, reviewing the predecessor
auditor’s working papers and reports and specific procedures over brought forward
balances. As part of this work, we discussed controls in place for key information
systems with management.
• Audit of areas with Complex Accounting Estimates. As outlined in the previous
section, we discussed with management and tested the areas of valuation of defined
benefit liability/assets and property, plant and equipment as areas involving complex
estimations and judgement. These areas took significant audit effort.
• Consideration of Consolidation Basis. We discussed with management in detail the
consolidation basis for its related parties, in particular the Strathclyde Partnership for
Transport and the Strathclyde Concessionary Travel Scheme Joint Committee, which
were initially accounted for as associates in the Group Accounts of the Council but did
not appear to meet the criteria set in the Code and accounting standards.
Significant difficulties during the audit
During the course of the audit we have had the full co-operation of management.
The Council did not meet the submission date of 30 September 2023, specified in the Local
Authority Accounts (Scotland) Regulations 2014, for approval of its audited annual
accounts. Mazars has discussed the implications of this with Audit Scotland who confirmed
there are no consequences for the Council.
The main reasons the submission date was not met include:
• Significant difficulties in recruiting auditors with relevant skills and experience. Whilst
these have been resolved, the delay in recruitment significantly impacted on our
ability to deliver the audit on a timely basis.
• The need to undertake additional work in the first year of the audit to gain assurance
over the opening balances in the financial statements and understand the Council.
• The need to address the implementation of International Standard on Auditing (ISA)
315 Revised. This required the audit team to spend additional time on the audit
• Areas of the audit that required further attention upon commencement of the fieldwork
phase due to complexity/judgement.
19

Page 20

4. Significant findings (continued)
Wider responsibilities
The 1973 Act gives rights to any person interested, such as the right to ask questions of the auditor and the right to make an objection to an item of account. No such objections have been
raised.
We are required to notify the Controller of Audit when circumstances indicate that a statutory report may be required.
• Section 102(1) of the 1973 Act allows us to prepare a report to the Commission about the Council’s accounts; matters that have arisen during the audit that should be brought to the
attention of the public; or the performance of the Council in their duties relating to Best Value and community planning.
• Section 102(3) of the 1973 Act allows us to make a special report to the Commission if an item of account is contrary to law; there has been a failure on someone’s part to bring into
account a sum which ought to have been brought into account; a loss has been incurred or deficiency caused by the negligence or misconduct of a person, or by the failure of a body to
carry out a duty imposed on them by any enactment; or a sum which ought to have been credited or debited to one account of a body has been credited or debited to another account
and the body has not taken, or is not taking, steps to remedy the matter.
• Section 97A of the 1973 Act allows us to undertake or promote comparative and other studies to make and publish recommendations for the securing by local government bodies of
Best Value, improving economy, efficiency and effectiveness in the provision of services by local government bodies and improving the financial or other management of local
government bodies.
We have no indication that a statutory report may be required.
20

Page 21

Section 05:
Internal control recommendations
21

Page 22

5. Internal control recommendations
As part of our audit of the financial statements, we obtained an understanding of internal
controls sufficient to plan our audit and determine the nature, timing and extent of testing
performed.  Although our audit was not designed to express an opinion on the
effectiveness of internal control, we are required to communicate to the Audit Committee
any significant deficiencies identified during the course of our work.
The purpose of our audit was to express an opinion on the financial statements. As part of
our audit we have considered the internal controls in place relevant to the preparation of
the financial statements in order to design audit procedures to allow us to express an
opinion on the financial statements but not for the purpose of expressing an opinion on the
effectiveness of internal control or to identify any significant deficiencies in their design or
operation.
The matters reported are limited to those deficiencies and other control recommendations
that we have identified during our normal audit procedures and that we consider to be of
sufficient importance to merit being reported. If we had performed more extensive
procedures on internal control we might have identified more deficiencies to be reported or
concluded that some of the reported deficiencies need not in fact have been reported. Our
comments should not be regarded as a comprehensive record of all deficiencies that may
exist or improvements that could be made.
Our findings and recommendations are set out below. We have assigned priority rankings
to each of them to reflect the importance that we consider each poses to your organisation
and, hence, our recommendation in terms of the urgency of required action. In summary,
the matters arising fall into the following categories:
Priority ranking Description Number of issues
1 (high) In our view, there is potential for financial loss,
damage to reputation or loss of information. This
may have implications for the achievement of
business strategic objectives. The
recommendation should be taken into
consideration by management immediately.
0
3
2 (medium) In our view, there is a need to strengthen internal
control or enhance business efficiency. The
recommendations should be actioned in the near
future.
0
3 (low) In our view, internal control should be
strengthened in these additional areas when
practicable.
22

Page 23

5. Internal control recommendations (continued)
Other deficiencies in internal control – Level 2
Description of deficiency – Property Plant and Equipment Valuation
Reconciliations
The Council does not as regular practice maintain a summary of the results of the
inhouse valuation undertaken under Programme 1 and Programme 2, showing total
values of assets revalued under each category and reconciling the assets revalued as
part of the 5-year rolling programme to the valuation certificates and to the amounts
recorded in the Fixed Assets Register and General Ledger.
Potential effects
The lack of this summary/reconciliation could mean that the completeness and
valuation of Property, Plant and Equipment  are misstated. The lack of this
reconciliation also contributed to making this audit area difficult and time consuming to
reconcile the valuation reports with the fixed asset register with the general ledger. This
also led to additional requests being made during the audit process.
Recommendation
As regular practice, management should prepare and maintain a reconciliation of the
results of any revaluation exercises conducted with the fixed asset registers/general
ledger and maintain summaries that agree as appropriate.
Management response
We currently carry out a reconciliation/check between the General Ledger, Asset
Register and Valuation Certificates, however, there is no summary spreadsheet that
demonstrates this 3 way check, only the check between the General Ledger and Asset
register is recorded.  We will look to provide a summary spreadsheet to assist the audit
process in future years.
Other deficiencies in internal control – Level 2
Description of deficiency – Errors in Exit Packages
Our testing of payroll identified four (4) exit packages that had errors on the redundancy
request forms and amounts per workings. The differences were likely due to the two
information systems used by the Council that is the HR system and the redundancy
forms which would have been signed prior to the member leaving.
Potential effects
Amounts paid out to former staff may be inaccurate and could lead to complaints and
further action by affected staff and reputational risk for the Council.
Recommendation
Management should use one system (HR system) for the calculation of exit packages.
Management response
The redundancy forms are signed off at an early stage in the process of allowing an
employee to leave and the figures at that time are an estimate of the costs that will be
incurred. As this form is authorised several weeks before the official agreed leaving date
the figures can change and the actual amount due to the employee can be different from
the original estimate. The four differences picked up by MAZARS had already been
identified during the accounts preparation process, checked with HR and the
appropriate back-up was provided to Mazars as part of the audit. There will always be a
small movement in figures between the date the form is signed and the leaving date.
This is not an error and is unavoidable but provides the best estimate at that point in
time.
23

Page 24

5. Internal control recommendations (continued)
Other recommendations in internal control – Level 2
Description of deficiency – Related Parties Declarations
Our testing of  identified several Annual Declaration forms for the Councillors had not
been signed and the form initially submitted for audit had no dates, signatures. As the
audit progressed more forms were subsequently obtained and provided to us.
Potential effects
Councillors/management not acting in the best interest of Council or with conflicts of
interest may not be identified in a timely manner.
Recommendation
Management should establish and improve the procedures around annual declaration
forms for related party transactions and work closely with Councillors and other relevant
related parties to ensure the declarations are appropriately completed and signed off, in
a timely manner.
Management response
We will consider how to revise our current process to ensure that we receive completed
forms back from all Elected Members in a timely manner.       
24

Page 25

5. Internal control recommendations (continued)
Follow up on previous internal control points
Description of deficiency
The Charities Accounts (Scotland) Amendment Regulations 2010 permits a single set
of accounts for connected charities. However, Argyll and Bute Council does not apply
the connected charities provision and currently prepares a separate set of annual
accounts for each Section 106 charity.
Potential effects
Duplication of efforts on the Finance Team.
Recommendation
The Council should apply the connected charities provision to reduce the number of
annual accounts prepared for its Section 106 charities.
2022/23 update
For 2022/23 the Council has applied the connected charities provision as
recommended. Resolved.
Follow up on previous internal control points
Description of deficiency
The previous auditors requested that management, in consultation with a qualified
valuer, carried out an additional assessment of the value of assets that had not been
valued in 2021/22.
Potential effects
As a result of this work, the estimated value of non-current assets increased by £29.9
million.
Recommendation
Management should put in place a process to ensure that an assessment of the value of
assets not revalued in year is carried out on an annual basis.
2022/23 update
In 2022/23 management had in place a process to ensure that they assessed the value
of assets not revalued in year. We noted one exception to this in terms of assets valued
under Existing Use Value, but upon further discussion, the estimated difference in value
for these assets was not significant. Resolved.
25

Page 26

Section 06:
Summary of misstatements
26

Page 27

6. Summary of misstatements - Council
This section outlines the misstatements identified during the course of the audit, above the trivial threshold for adjustment of £250k. The first table outlines the misstatements that were
identified during the course of our audit which management has assessed as not being material either individually or in aggregate to the financial statements and does not currently plan to
adjust.
The second table outlines the misstatements that have been adjusted by management during the course of the audit.
Unadjusted misstatements
27
- -
Comprehensive
Income and
Expenditure
Statement
Debit (£’000)
Comprehensive
Income and
Expenditure
Statement
Credit (£’000)
Balance Sheet
Debit (£’000)
Balance Sheet
Credit (£’000) Description of adjusted misstatement
1 Debit: Pension Asset 2,417 To adjust for error apportioned to Argyll and Bute
Council from Strathclyde Pension Fund for
understatement of private equity, debt infrastructure
and direct impact portfolio
1 Credit: CIES Remeasurement of net
defined liability
2,417 -
Total unadjusted misstatements 2,417 2,417

Page 28

6. Summary of misstatements – Council (Continued)
This section outlines the misstatements identified during the course of the audit, above the trivial threshold for adjustment of £250k. There were no unadjusted misstatements.
The table outlines the misstatements that have been adjusted by management during the course of the audit.
Adjusted misstatements
- -
Comprehensive
Income and
Expenditure
Statement
Debit (£’000)
Comprehensive
Income and
Expenditure
Statement
Credit (£’000)
Balance Sheet
Debit (£’000)
Balance Sheet
Credit (£’000) Description of adjusted misstatement
1 Debit: Pension Reserve 99,179 To adjust pension liability for the asset ceiling
1 Credit: Pension Liability 99,179 -
2 Debit: Pension Liability 6,120 To recognise revised remeasurements in Other
Comprehensive Income and Expenditure from
amended Actuary’s report
2 Credit: Pension Reserve 6,120 -
3 Debit:  Expenditure Bank Account 1,586 Reversal of Matching adjustments to reflect
previously done adjustments.
3 Credit: Live Argyll Expenditure Bank
Account
1,586 -
4 Debit:  Expenditure Bank Account 1,554 Reversal of Matching adjustments to reflect
previously done adjustments.
Credit: Live Argyll Expenditure Bank
Account
1,554 -
28

Page 29

6. Summary of misstatements – Council (Continued)
Adjusted misstatements (Continued)
- -
Comprehensive
Income and
Expenditure
Statement
Debit (£’000)
Comprehensive
Income and
Expenditure
Statement
Credit (£’000)
Balance Sheet
Debit (£’000)
Balance Sheet
Credit (£’000) Description of adjusted misstatement
5 Debit:  Expenditure Bank Account 1,443 Reversal of Matching adjustments to reflect
previously done adjustments.
1 Credit: Live Argyll Expenditure Bank
Account
1,443 -
6 Debit:  Expenditure Bank Account 1,346 Reversal of Matching adjustments to reflect
previously done adjustments.
2 Credit: Pension Reserve 1,346 -
7 Debit:  Expenditure Bank Account 629 Reversal of Matching adjustments to reflect
previously done adjustments.
3 Credit: Live Argyll Expenditure Bank
Account
629 -
8 Debit:  Expenditure Bank Account 348 Reversal of Matching adjustments to reflect
previously done adjustments.
Credit: Live Argyll Expenditure Bank
Account
348 -
- Total adjusted misstatements 112,205 112,205 -
29

Page 30

6. Summary of misstatements (continued)
Disclosure amendments
We identified the following disclosure adjustments during our audit that have been corrected by management:
 Remuneration report:- Minor disclosure narrative amendments to the remuneration report
 The figure for depreciation in the unaudited accounts within Note 7.1 was incorrect at £35,089. The council amended the Note to correct this figure to £27,828.
 The amount originally disclosed for the climate change project NDEEF1 contract was incorrect - originally £1,370k, this was amended to £1,192k following audit testing
 Amount disclosed under IFRS15 changed  on Note 7.2 – with the IFRS15 revenue disclosed increasing from £28,063k to £32,900k within the note
 Note 27.1 Financial instruments was amended to eliminate assets and liabilities whose nature meant they were excluded from recognition as financial instruments in line with the
Code.
 Note 36 in the audited Financial Statements updated total net assets for trusts  to £2,278k from £2,273k in the unaudited financial statements.
 There were other adjustments to the annual report and accounts for minor disclosure, consistency or presentational matters.
We identified the following minor disclosure adjustment during our audit that has not been corrected by management:
 The Statement of Cashflows was presented in a manner slightly inconsistent with established practice, in that the movements in operating cash flow were represented in the
direction opposite to the expectation for example increase in debtors represented as a positive cash flow movement rather than negative.
30

Page 31

6. Summary of misstatements – Group
This section outlines the misstatements identified during the course of the audit, above the trivial threshold for adjustment of £250k.
Adjusted misstatements
- -
Comprehensive
Income and
Expenditure
Statement
Debit (£’000)
Comprehensive
Income and
Expenditure
Statement
Credit (£’000)
Balance Sheet
Debit (£’000)
Balance Sheet
Credit (£’000) Description of adjusted misstatement
1 Debit: Comprehensive Income and
Expenditure Statement
5,644 To derecognize the consolidated Strathclyde
Partnership for Transport and Strathclyde
Concessionary Travel Scheme Joint Committee
1 Credit: Investment in Associates and
Joint Ventures (previously
accounted for on an equity basis)
5,644 -
Total Adjusted misstatements 5,644 5,644
31

Page 32

Section 07:
Wider scope
32

Page 33

7. Commentary on Wider Scope
Overall summary
33

Page 34

7. Commentary on Wider Scope
Wider scope summary
As auditors appointed by the Accounts Commission, our wider scope responsibilities are set out in the Audit Scotland’s Code of Audit Practice 2021 and sits alongside Best Value
requirements detailed the Local Government (Scotland) Act 1973. The Code requirements broaden the scope of the 2022/23 audit and allows us to use a risk-based approach to
report on our consideration of the Council’s performance of Best Value and community planning duties and make recommendations for improvement and, where appropriate,
conclude on the Council’s performance.
The Code’s wider scope framework is categorised into four areas:
• financial management;
• financial sustainability;
• vision, leadership and governance; and
• use of resources to improve outcomes.
Overall summary by reporting criteria
From the satisfactory conclusion of our audit work, we have the following conclusions:
- Reporting criteria Commentary
page reference Identified risks? Actual risks identified? Other recommendations made?
Financial management 33 No No No
Financial sustainability 39 Yes – see risk 1 on page 40 No No
Vision, leadership and
governance 42 No No No
Use of resources to
improve outcomes 46 No No No
34

Page 35

7. Commentary on Wider Scope
Financial management
Financial management is concerned with financial capacity, sound
budgetary processes and whether the control environment and internal
controls are operating effectively.
35

Page 36

7. Financial management
Our overall assessment
Area assessed Our findings Our judgements Risks identified
Financial
management
culture
The Council has approved a Local Code of
Corporate Governance. This sets out its
commitment to achieving good governance. The
Code covers how the Council will manage risks and
its performance through robust internal control and
strong public financial management.
The Council has a system of internal control which is
designed to manage risk to a reasonable level. Key
features include:
• Codes of conduct for employees and members
• Scheme of delegation, standing orders and
financial regulations
• Regular management information, financial
regulations and a system of delegation and
accountability
• A risk management framework and strategic risk
register
• An induction programme for new and returning
councillors and regular training seminars.
The Council has an appropriate financial
management culture in place. It reviews its system
of internal financial control annually.
No significant issues identified.
36

Page 37

37
7. Financial management (continued)
Our overall assessment (continued)
Area assessed Our findings Our judgements Risks identified
Accountability Officers regularly presented financial performance
reports to the Council during 2022/23 to update
members on the Council’s position against budget
and the progress of savings programmes. The
reports provide sufficient detail for Council members
to effectively scrutinise the Council’s finances.
In 2022/23, the Council recorded an accounting
deficit of £6.047 million within the Comprehensive
Income and Expenditure Statement.
There was an overall underspend against the
revenue budget of £3.273 million.
The Council has appropriate budget monitoring and
reporting arrangements in place.
No significant issues identified.

Page 38

38
7. Financial management (continued)
Our overall assessment (continued)
Area assessed Our findings Our judgements Risks identified
Arrangements
to prevent and
detect fraud,
error and other
irregularities,
bribery and
corruption
The Council has established arrangements for
preventing and detecting fraud and corruption.
These include:
• Whistleblowing policy
• Anti-fraud strategy
• Codes of conduct for councillors and officers.
The Council has a dedicated counter-fraud team
which sits within its internal audit function to
investigate fraudulent claims covering tenancy,
procurement, council tax reduction, Scottish Welfare
Fund, social care, employee, insurance, council tax
exemptions and discounts and blue badges.
Individuals can report concerns by phone, email or
through an online form on the Council’s website.
The Council has appropriate arrangements to
prevent and detect fraud and corruption.
No significant issues identified.

Page 39

7. Commentary on Wider Scope
Financial sustainability
Financial sustainability looks forward to the medium and longer term to
consider whether the body is planning effectively to continue to deliver its
services or the way in which they should be delivered.
39

Page 40

7. Financial sustainability 
Significant risks
We have outlined below the risks of significant risks in arrangements that we have identified as part of our continuous planning procedures, and the work undertaken to respond to
each of those risks. 
- Significant Risk in Arrangements Identified Work undertaken and the results of our work
1 Financial sustainability
Councils continue to face significant financial
challenges with
pressures on funding and increasing demand for
services.
Budget estimates (prior to setting the 2024/2025
budget) anticipate an in-year budget gap of
£10.167 million for 2024/25, rising to a
cumulative budget gap of £39.471 million by the
end of 2028/29 based upon a ‘midrange’
scenario. The Council’s ‘worst case’ scenario
highlights a potential £90.133 million cumulative
budget gap by the end of 2028/29. These figures
do not include potential future years options e.g.
fees and charges inflationary increase, council
tax increase, etc.
This represents a risk in relation to financial
sustainability, impacting on the future provision
of services in the Council’s
area.
Work undertaken
We reviewed the Council’s:
• medium to long term financial strategy;
• financial position and track record in delivering planned recurrent and non-recurrent savings in 2022/23;
• financial performance in 2023/24 and updates to its financial planning during the year, including the implications for
general reserves balances;
• regular reporting to members on financial performance, savings plans and financial risks; and
• progress in developing plans to address future year budget gaps.
Results of our work
• The Council achieved planned savings in 2022/23.
• The Council reported an overall accounting deficit within its Comprehensive Income and Expenditure Statement.
• The Council had an underspend on the revenue budget in 2022/23 of £3.273 million.
• Officers present regular financial updates and budgetary control reports to Council meetings. These provide an
update on the general services revenue budget and the Council’s capital programme. Reports include additional
information on budget variances and updates on the progress of agreed savings.
• The Council has established a cross-party budget working group to ensure that there is early engagement on
budget proposals.
• The Budget for 2024/25 has been approved in February 2024, with the Council being the first in Scotland to
approve a Council Tax increase, with this set to be at 10%, against the backdrop of the Scottish Government’s
council tax freeze. This shows the ability of the Council to make tough decisions in order to maintain its provision of
services.
40

Page 41

7. Financial sustainability (continued)
Our overall assessment
Area
assessed Our findings Our judgements Risks identified
Financial
planning Officers present four financial updates a year to Council meetings.
These provide an update on the financial challenges facing the
Council and estimated revenue budget gaps under best case, worst
case and mid-range scenarios. Scenarios are based on financial
planning assumptions that are updated by officers on an ongoing
basis.
The Council faces a very challenging financial position. Its mid-
range case scenario, after some assumptions on future years
options, and after the 2024/25 budget was approved, projects the
following in-year budget gaps:
• £4.908 million in 2025/26
• £5.479 million in 2026/27
• £5.782 million in 2027/28
• £3.122 million in 2028/29
The Council has established a cross-party budget working group to
ensure that there is early engagement on budget proposals. The
Council has approved a Council Tax increase of 10% for Argyll and
Bute area for 2024/25 to enable sustainability of provision of
services.
The Council has effective financial planning, with an
established process to ensure there is early
engagement of budget proposals. Councillors and
officers need to continue working together to make the
difficult decisions to respond to the Council’s
challenging financial position.
No significant issues identified.
41

Page 42

7. Commentary on Wider Scope
Vision, leadership and governance
Vision, Leadership and Governance is concerned with the effectiveness of
scrutiny and governance arrangements, leadership and decision making,
and transparent reporting of financial and performance information.
42

Page 43

7. Vision, leadership and governance
Our overall assessment
Area
assessed Our findings Our judgements Risks identified
Clarity of
plans to
implement
the vision
The Council adopted its Strategic Plan 2023 – 2027,
known as the Corporate Plan. This sets a clear vision
and key commitments for the Council over the period.
The Council’s priorities for 2023 to 2027 are
categorised under the themes of:
• Education;
• Roads, Amenities and Infrastructure;
• Potential and Growth - turning opportunities into
reality; and
• Partnership and Action - everyone has a part to play
in Argyll and Bute's success.
The Corporate Plan sets a clear vision for the
Council for the four-year period. This focuses on
working with residents, communities, and
businesses to deliver the best possible services
and targeting resources to those most in need.
No significant issues identified.
Strategy and
priorities The Council has described what success will look like
for each of its objectives. The Corporate Plan also
includes measures of success for each priority and
sets out key commitments.
The Corporate Plan measures are based on improving
key performance indicators over the four years of the
plan. Services are responsible for setting targets for
these measures in delivery plans and regularly
monitoring and reporting progress.
The Corporate Plan sets out objectives, measures
of success and key commitments under each
priority.
No significant issues identified.
43

Page 44

7. Vision, leadership and governance (continued)
Our overall assessment (continued)
Area
assessed Our findings Our judgements Risks identified
Governance
arrangements The Council’s governance arrangements are centred
on Council meetings, service committees and the
Audit and Scrutiny Committee.
Council and Audit and Scrutiny Committee meetings
are well attended by councillors and papers are
subject to a good level of scrutiny.
Council and committee meeting papers and minutes
are available on the Council’s website and meetings
are open to the public. Deputations can be heard at
meetings of the Council and its principal committees. 
In addition, the Council Area Committees have a
standing agenda item for Public Questions to be put
and answered.
The Council has appropriate governance
arrangements in place. We found evidence of
effective scrutiny and challenge, and transparent
decision making at Council and Audit Committee
meetings.
No significant issues identified.
44

Page 45

45
7. Vision, leadership and governance (continued)
Our overall assessment (continued)
Area
assessed Our findings Our judgements Risks identified
Financial and
performance
information
Officers present regular financial updates and
budgetary control reports to Council meetings. The
budgetary control reports provide an update on the
general services revenue budget and the Council’s
capital programme. These reports include additional
information on budget variances and updates on the
progress of agreed savings.
The Council reports progress against delivery plans
to councillors through its service committees. These
reports show the performance of each service against
its performance indicator targets and progress in
delivering agreed actions.
The Council provides councillors with sufficient
information to allow effective scrutiny of its finances
and performance. The Council’s annual
performance report is clearly presented and
accessible.
No significant issues identified.

Page 46

7. Commentary on Wider Scope
Use of resources to improve outcomes
Audited bodies need to make best use of their resources to meet stated
outcomes and improvement objectives, through effective planning and working
with strategic partners and communities. This includes demonstrating economy,
efficiency, and effectiveness through the use of financial and other resources
and reporting performance against outcomes.
46

Page 47

7. Use of resources to improve outcomes
Our overall assessment
Area
assessed Our findings Our judgements Risks identified
Resources
deployed to
improve
strategic
outcomes
The Council has a workforce planning process in place. It
covers the strategic and team specific levels . This
includes a risk matrix to identify areas of priority.
Workforce issues appear on risk registers where
appropriate and action plans are also in place. The
strategic workforce plan is being integrated into the new
people strategy to create a single delivery plan.
The Council’s 2023/24 budget, agreed in February 2023,
reflected its strategic priorities. There is evidence of
budget decisions that support the council’s priorities.
The Council’s resource plans are aligned with
its strategic plan. It can demonstrate 2023/24
budget decisions which reflected its strategic
priorities.
No significant issues identified.
47

Page 48

48
7. Use of resources to improve outcomes (continued)
Our overall assessment (continued)
Area
assessed Our findings Our judgements Risks identified
Needs of
service users
being met
The Council’s delivery plans set out how it will achieve its
strategic priorities. There is a Council-wide annual
business plan as opposed to individual service delivery
plans.
The Annual Business Plan sets out the strategic priorities
for all services and demonstrates how they align with the
Council’s priorities and the Local Outcomes Improvement
Plan.
The Council, through its Annual Business Plan,
has identified how services will contribute to
achievement of its strategic priorities and
objectives. The Council consults regularly with
service users to understand how it can meet
their needs.
No significant issues identified.

Page 49

49
7. Use of resources to improve outcomes (continued)
Our overall assessment (continued)
Area
assessed Our findings Our judgements Risks identified
Arrangements
to deliver
continuous
improvements
in priority
services
The Council’s corporate plan sets clear objectives and
highlights the services it plans to prioritise. This plan
measures are based on improving key performance
indicators over the four years of the plan. Services are
responsible for setting targets for these measures in
delivery plans and regularly monitoring and reporting
progress.
The Council has clear priorities and suitable
arrangements in place to measure
improvement. The Council is looking at
opportunities to make efficiencies through
service innovation.
No significant issues identified.

Page 50

Section 08:
Best Value
50

Page 51

8. Best Value
Best Value summary
Under the Code of Audit Practice, the audit of Best Value is fully integrated within our annual audit work. We are required to assess the seven Best Value themes at the Council over the
period of the audit appointment. We have used a risk-based approach that is proportionate to the size and type of the body, to assess whether the Council has made proper arrangements
for securing Best Value and is complying with its community planning duties. We have also followed up on previously reported Best Value findings which has assessed the pace and depth
of improvement.
We will also conduct thematic reviews as directed by the Accounts Commission. In 2022/23 this will be on the effectiveness of council leadership in developing new strategic priorities
following the elections in May 2022. We have prepared a separate management report to document the findings of this work which can be found on Audit Scotland’s website.
At least once every five years, the Controller of Audit will report to the Accounts Commission on the Council’s performance in meeting its Best Value duties. The Council is included in the
first year of the programme which runs from October 2023 to August 2024.
At the planning stage of the audit, we undertook work to understand the arrangements that the Council has in place under each of the reporting criteria and we identify risks of significant
risks in those arrangements. We have kept our understanding of arrangements under review and updated our risk assessment throughout the audit to reflect emerging issues that may
suggest significant risks in arrangements exist. The following slides outline the work that we have undertaken for each of the seven Best Value themes and any improvements or risks in
arrangements that have been identified as part of our assessment. We have reported recommendations for the risks identified.
51

Page 52

8. Best Value (continued)
Overall summary by reporting criteria
From the satisfactory conclusion of our audit work, we have the following conclusions:
- Reporting criteria Commentary
page reference Identified risks? Actual risks identified? Other recommendations made?
Best Value 53 No No No
Thematic reviews 58 No No No
Climate change 61 No No No
Statutory Performance
Indicators 62 No No No
Service Performance 64 No No No
52

Page 53

8. Best Value (continued)
Our overall assessment of the Best Value themes
Best Value
theme Our findings Our judgements Service improvement
considerations Risks identified
Vision and
leadership Our 2022/23 Best Value thematic review
considered:
• How clear is the new Council vision and its
priorities?
• Overall, how effective has the leadership
been (political and officer) in setting clear
priorities and a sustainable approach to
delivering them?
The Council has a clear vision
with three outward facing
priorities and one inward
looking.
The Council needs to maintain
effective leadership to continue
to achieve its priorities and to
make the difficult decisions to
respond to its challenging
financial position.
None identified. No significant issues identified.
Governance
and
accountability
Our 2022/23 wider scope work considered:
• Whether the Council can demonstrate that
its governance arrangements are
appropriate and operating effectively?
• Is there evidence of effective scrutiny,
challenge and transparency on decision
making at governance committees?
See page 44.
The Council has appropriate
governance arrangements in
place. We found evidence of
effective scrutiny and
challenge, and transparent
decision making at Council
and Audit Committee
meetings.
None identified. No significant issues identified.
53

Page 54

8. Best Value (continued)
Our overall assessment of the Best Value themes (continued)
Best Value
theme Our findings Our judgements Service improvement
considerations Risks identified
Effective use
of resources Our 2022/23 Best Value thematic review
considered:
• How good are the delivery plans and is there
alignment of financial, workforce, asset and
digital plans with the Council’s priorities?
The Council’s annual
business plans, and
workforce and digital
strategies are aligned with
its corporate plan. It can
demonstrate 2023/24
budget decisions which
reflected its strategic
priorities.
None identified. No significant issues identified.
Partnerships
and
collaborative
working
We did not assess this theme in 2022/23. N/A N/A N/A
Working
with
communities
Our 2022/23 Best Value thematic review
considered:
• How effectively have the views of citizens and
communities been reflected in the priorities and
decisions taken by the Council?
The Council knows it needs
to work effectively with
citizens and communities to
achieve its strategic
objectives. Community
budgeting and participatory
budgeting are two ways it is
involving local people in
decision making.
None identified. No significant issues identified.
54

Page 55

8. Best Value (continued)
Our overall assessment of the Best Value themes (continued)
Best Value
theme Our findings Our judgements Service improvement
considerations Risks identified
Sustainability We did not assess this theme in 2022/23. N/A N/A N/A
Fairness and
equality Our 2022/23 Best Value thematic review
considered:
• How effectively do the Council priorities reflect
the need to reduce inequalities?
Actions to reduce
inequalities underpin the
Council’s priorities and
objectives. The Council is
focussing on providing
support to communities
affecting by the cost-of-
living crisis.
None identified. No significant issues identified.
55

Page 56

8. Best Value (continued)
Follow up of previously-reported recommendations
We are required to follow up Accounts Commission findings, Controller of Audit recommendations and any outstanding improvement actions reported in Best Value Assurance Reports
and Annual Audit Reports.
In 2020 Audit Scotland reported recommendations to the Council to address risks identified from its Best Value audit. As part of our work in 2022/23, we followed up the progress made
by the Council against the recommendations made and determined whether the risk remained during the year.
- Best Value finding as
reported by previous auditor
Management response and
implementation timeframe Work undertaken and judgements made in 2022/23 Conclusions reached
1 Is the Council demonstrating
continuous improvement?
The Council should increase
the pace of change through
transformation to deliver the
business outcomes and this
should be monitored and
reported on a regular basis.
The Council will develop and agree a
refreshed approach to transformational
activity, identify thematic areas of activity
and explore opportunities to shift
investment towards prevention and more
effective and efficient interventions.
Progress against the recommendation
Progress against the recommendation
In September 2020, the Council embarked on the
Performance Excellence Project. Some key changes
arising from this project included the removal of Business
Outcomes, the decommissioning of Pyramid (web-based
performance management system), and the cessation of
annual Service Plans.
The project also led to the identification of a suite of 47
Corporate Outcome Indicators aligned to the Corporate
Outcomes. The Corporate Outcome Indicators are
reported annually.
Quarterly performance reports continue to be presented
to all 4 Area Committees; these largely contain indicators
that are of interest at a local level.
Conclusions
Complete
56

Page 57

57
8. Best Value (continued)
Follow up of previously-reported recommendations (continued)
- Best Value finding as
reported by previous auditor
Management response and
implementation timeframe Work undertaken and judgements made in 2022/23 Conclusions reached
2 The Council should assess the
extent to which regeneration
and economic development
initiatives are delivering the
vision and corporate
outcomes. The Council should
put in place robust options
appraisal processes and a
benefits monitoring framework,
proportional to the size of
initiatives, to evaluate the
benefits and costs of future
projects.
The Council will review options appraisal
processes and benefits monitoring
framework to ensure systems are robust
and evaluate the benefits and costs of
projects, create inter-departmental project
review team and scope review of project
process to align to BV3 Objective.
Implementation timescale: April 2022
Progress against the recommendation
Progress against the recommendation
The Council is undertaking a wide number of initiatives
relating to economic development activity. These
include the ongoing work relating to the Rural Growth
Deal and various other outline business cases they are
undertaking in relation to the agreed themes with
Government. These considerations include option
appraisals, and following approval by the Council and
both Governments, full business cases will be
submitted for final approval.
As part of the RGD process the Council is also required
to develop a detailed realisation plan which will set out
the anticipated benefits and how these will be
monitored over the lifetime of the RGD programme.
Conclusions
Complete
3 Community Engagement
The Council should work with
communities and community
groups to understand and
address their concerns and
establish priorities in how it
can better support them. This
should include engaging with
communities to understand
and improve levels of
satisfaction with council
services.
The Council will engage with communities
to understand and improve levels of
satisfaction with council services in order to
understand and address their concerns.
Implementation timescale: December 2021
Progress against the recommendation
The Council has established a Community
Engagement group to develop its  engagement
framework. This group has council wide representation.
It will determine the  overall strategic approach, tools to
share engagement activities and any findings internally
and will support the learning/ training of staff to build
knowledge and confidence around engagement
activity. This group will also lead on establishing a
dedicated space for the public to view engagement
findings. 
The Council carries out regular satisfaction surveys
through the customer service centre.
Conclusions
Complete

Page 58

8. Best Value (continued)
Thematic reviews
The Accounts Commission reports nationally on thematic aspects of local government bodies’ approaches to, and performance in, meeting their Best Value and community planning
duties. As appointed auditors of the Council we are required to report on Best Value or related themes thematic work prescribed by the Accounts Commission. For the thematic work
in 2022/23, we are required to carry out an overview of the effectiveness of the Council’s leadership (officers and elected members) in developing new local strategic priorities
following the elections in May 2022. As part of this review, we are required to report on the areas documented in the table below. The full thematic review report for the Council can be
found on Audit Scotland’s website.
Thematic themes Our findings Our judgements Risks identified
Council vision and
priorities The Council agreed a new approach to Strategic Planning and
Performance in November 2022. This included setting strategic
priorities to support the Council, its citizens and businesses to
recover and renew after the Covid-19 pandemic. The Council agreed
a continued commitment to the vision of a successful, vibrant Argyll
and Bute with a growing population and thriving economy.
The Council promoted its priorities through its website and
engagement with staff and trade unions and the Community Planning
Partnership (CPP). The Council is working to ensure all decisions it
makes are aligned with its priorities.
The Corporate Plan sets a clear vision for
the Council for the four-year period. This
focuses on working with residents,
communities, and businesses to deliver
the best possible services and targeting
resources to those most in need.
No significant issues identified.
Citizen and
community
engagement
The Council has established a Community Engagement group to
develop an engagement framework, which has council wide
representation. This framework will provide the overall strategic
approach. The group will then develop tools to be used in for
engagement activities and will be used as the mechanism to allow
representatives to share experience and findings from engagement
activities undertaken. It is intended to facilitate learning and support
for employees to help build their knowledge and confidence in
engagement. .
The Council carries out regular satisfaction surveys through its
customer service centre. It is extending its ability to provide
information on services and feedback using “bots” and has performed
highly in Customer Service Excellence accreditation.
The Council knows it needs to work
effectively with citizens and communities
to achieve its strategic objectives.
No significant issues identified.
58
58

Page 59

8. Best Value (continued)
Thematic reviews (continued)
Thematic themes Our findings Our judgements Risks identified
Reducing inequalities
and tackling climate
change
The Council’s priorities and the locality plans focus on reducing inequalities and
ensuring the Council distributes its resources fairly and equitably. The Council has
a Child Poverty Action Plan, as well as a COVID Recovery Action Plan, which aim
to tackle inequalities and address fairness. The Council has also made tackling
climate change a priority and is developing a climate action plan setting out how it
will support the Scottish Government’s climate change targets.
Actions to reduce inequalities and
combat climate change underpin
the Council’s priorities and
objectives.
No significant issues
identified.
Alignment of delivery
plans There is a Council-wide Annual Business Planning process in place. The Annual
Business Plan replaces the Council’s previous approach of having individual
service plans. The Annual Business Plan sets out the strategic priorities for all
services and demonstrates how they align with the Council’s priorities and the
Local Outcomes Improvement Plan.
The Council’s annual business
plans, and workforce and digital
strategies are aligned with the
corporate plan. It can demonstrate
2023/24 budget decisions which
reflected its strategic priorities.
No significant issues
identified.
59
59

Page 60

8. Best Value (continued)
Thematic reviews (continued)
Thematic themes Our findings Our judgements Risks identified
Leadership Officers and the administration’s elected members worked
effectively to agree the Council’s refreshed priorities soon after
the May 2022 council elections. The administration also worked
with other councillors to gain consensus on the priorities.
Officers engage with the administration in advance of council and
service committee meetings and on major policy initiatives. There
is also engagement and joint working between officers and
elected members as guided by the Ethical Framework and the
Constitution. Specific activities to support collaboration include:
• Members seminars;
• the Budget Working Group which is cross party;
• Policy Leads having dedicated time with Chief Officers relative
to their portfolio,
• the CEO holding weekly meetings with the Leader and Deputy
Leader and, frequent one to one meetings with the Leader of
the main opposition group; and
• the CEO having a monthly joint session with all Group
Leaders.
To demonstrate its commitment to good governance, there are
codes of conduct for both members and employees in place
which include a zero-tolerance policy on fraud. The Council has
an internal audit department, which includes a counter fraud
team, to investigate any such matters reporting to the Audit and
Scrutiny Committee on investigations results.
Administration elected
members and officers worked
together to agree clear
strategic priorities, objectives,
and measures of success.
The council needs to maintain
effective leadership to
continue to achieve its
priorities and make the
difficult decisions to respond
to its challenging financial
position.
No significant issues identified.
60
60

Page 61

8. Best Value (continued)
Climate change
In October 2021, the Scottish Government issued ‘Public Sector Leadership on the Global Climate Emergency’ guidance. This recommended that public bodies should consider
climate risk and adaption; reporting to external frameworks; and climate change performed linked to their objectives to ensure clear accountability on performance.
In September 2022, Audit Scotland issued ‘Scotland's councils' approach to addressing climate change’ guidance which highlighted the critical role that Councils have in meeting Net
Zero targets by 2045. Councils should consider their plans to make sure they are adequate, there is transparency in what is included in targets, ensure actions are clear, and that
detail is included about how the Council will deal with residual emissions. They should also be more transparent about any gaps between the level of impact their planned actions will
have and the scale of the challenge. The guidance also highlights the importance of collaboration across councils, key partners and local communities.
The Auditor General and Accounts Commission are developing a programme of work on climate change. This involves a blend of climate change-specific outputs that focus on key
issues and challenges as well as moving towards integrating climate change considerations into all aspects of audit work.
Our commentary of the Council’s climate change arrangements
The Council has set clear goals on becoming a net zero organisation by 2045. In 2023 it also achieved Bronze Carbon Literate accreditation. All committee reports also have to
consider Climate Change implications as part of impacts. The Corporate Plan 2023-2027 specifically records several actions / priorities relating to climate change, for example
reducing waste and increasing energy efficiency.
Argyll and Bute Council has a Decarbonisation Plan 2022-2025, supported by a Climate Change Action Plan with tangible actions. The Climate Change Action Plan is regularly
updated.
The Council monitors and reports progress internally via its Climate Change Board.
The Council monitors and reports its progress via the Policy and Resources Committee. These committee papers are available to the public. There is further public reporting of
progress via the statutory annual Public Bodies Climate Change Reporting, with reports submitted to Sustainable Scotland Network (as required by ‘Climate Change (Duties of
Public Bodies: Reporting Requirements) (Scotland) Order 2015’ and Climate Change (Duties of Public Bodies: Reporting Requirements) (Scotland) Amendment Order 2020).
Mandatory reporting began in 2015/16.
The Council also shares the Decarbonisation Plan, and Climate Change Action Plan Updates on its website.
61
61

Page 62

8. Best Value (continued)
Statutory Performance Indicators
We are required to report on the Council’s effectiveness and appropriateness of arrangements in place for complying with the Direction issued in December 2021, including the
balance and timeliness of reporting to members along with its accessibility for citizens and communities.
The table below details our overall assessment of the Council’s statutory performance indicators arrangements:
Council’s
arrangements Our findings Our judgements Risks identified
Statutory
Performance
Indicator 1:
Improving
local services
and local
outcomes
Statutory Performance Indicator (SPI) 1 requires a council to report its
performance in improving local public services and progress against
agreed desired outcomes
The Council’s website includes a section with information to help the
public measure its performance. The website contains details on the
nature of reports prepared and the frequency of preparation. It also
contains links to strategic and area committee reports, as well as
annual performance reports and the customer service charter and
annual audit reports.
The Council reports progress against its annual business plan to
councillors. Progress is reported semi-annually to the Audit and
Scrutiny Committee, and quarterly to Area Committees.
On an annual basis, an annual performance review is undertaken by
each service and an annual performance report is prepared and
presented to the Council.
The Council has appropriate
arrangements in place for complying with
SPI 1.
No significant issues identified.
62
62

Page 63

63
8. Best Value (continued)
Statutory Performance Indicators (continued)
Council’s
arrangements Our findings Our judgements Risks identified
Statutory
Performance
Indicator 2:
Demonstrating
Best Value
SPI 2 requires a council to report its own assessment and audit,
scrutiny and inspection body assessments of how it is performing
against its duty of Best Value, and how it has responded to these
assessments.
The Council’s website includes a section on external audit and
inspection reports with links to where reports can be found.
The Council’s website also includes its action plans in response to
assessments made by audit, scrutiny and inspection bodies within the
performance and improvement section of the website, for example its
action plan on the previous Best Value Report 2020. It is fairly easy to
find.
The Council is compliant with SPI 2. No significant issues identified.
63

Page 64

Appendices
A: Draft management representation letter
B: Draft audit report
C: Independence
D: Other communications
E: Wider scope and Best Value ratings

Page 65

Appendix A: Draft management representation letter
65
Cameron Waddell
Mazars LLP
26 Mosley Street
Newcastle upon Tyne
NE1 1DF
20 March 2024
Dear Cameron
Argyll and Bute Council - Audit for the Year Ended 31 March 2023
This representation letter is provided in connection with your audit of the financial statements of Argyll and Bute Council (the Council) for the year ended 31 March 2023 for the purpose of expressing an opinion as to whether the
financial statements give a true and fair view in accordance with the Part VII of the Local Government (Scotland) Act 1973 and UK adopted international accounting standards, as interpreted and adapted by the Code of Practice
on Local Authority Accounting in the United Kingdom 2022/23 (the 2022/23 Code).
I confirm that the following representations are made on the basis of enquiries of management and staff with relevant knowledge and experience (and, where appropriate, inspection of supporting documentation) sufficient to
satisfy myself that I can properly make each of the following representations to you.
My responsibility for the financial statements and accounting information
I believe that I have fulfilled my responsibilities for the true and fair presentation and preparation of the financial statements in accordance with the Part VII of the Local Government (Scotland) Act 1973 and UK adopted
international accounting standards, as interpreted and adapted by the Code of Practice on Local Authority Accounting in the United Kingdom 2022/23 (the 2022/23 Code).
My responsibility to provide and disclose relevant information
I have provided you with:
• access to all information of which I am aware that is relevant to the preparation of the financial statements such as records, documentation and other material;
• additional information that you have requested from us for the purpose of the audit; and
• unrestricted access to individuals within the Council you determined it was necessary to contact in order to obtain audit evidence.
I confirm as Section 95 Officer that I have taken all the necessary steps to make me aware of any relevant audit information and to establish that you, as auditors, are aware of this information.
As far as I am aware there is no relevant audit information of which you, as auditors, are unaware.
Accounting records
I confirm that all transactions undertaken by the Council have been properly recorded in the accounting records and are reflected in the financial statements. All other records and related information, including minutes of all
management and Board meetings, have been made available to you.
Accounting policies
I confirm that I have reviewed the accounting policies applied during the year in accordance with International Accounting Standard 8 and consider these policies to faithfully represent the effects of transactions, other events or
conditions on the Council’s financial position, financial performance and cash flows.

Page 66

66
Appendix A: Draft management representation letter
Accounting estimates, including those measured at fair value
I confirm that the methods, significant assumptions and the data used by the Council in making the accounting estimates, including those measured at fair value are appropriate to achieve recognition, measurement or disclosure
that is in accordance with the applicable financial reporting framework.
Contingencies
There are no material contingent losses including pending or potential litigation that should be accrued where:
• information presently available indicates that it is probable that an asset has been impaired, or a liability had been incurred at the balance sheet date; and
• the amount of the loss can be reasonably estimated.
There are no material contingent losses that should be disclosed where, although either or both the conditions specified above are not met, there is a reasonable possibility that a loss, or a loss greater than that accrued, may have
been incurred at the balance sheet date.
There are no contingent gains which should be disclosed.
All material matters, including unasserted claims, that may result in litigation against the Council have been brought to your attention. All known actual or possible litigation and claims whose effects should be considered when
preparing the financial statements have been disclosed to you and accounted for and disclosed in accordance with the Part VII of the Local Government (Scotland) Act 1973 and UK adopted international accounting standards, as
interpreted and adapted by the Code of Practice on Local Authority Accounting in the United Kingdom 2022/23 (the 2022/23 Code).
Laws and regulations
I confirm that I have disclosed to you all those events of which I are aware which involve known or suspected non-compliance with laws and regulations, together with the actual or contingent consequences which may arise
therefrom.
We have complied with all aspects of contractual agreements that would have a material effect on the accounts in the event of non-compliance.
Fraud and error
I acknowledge my responsibility as Section 95 Officer for the design, implementation and maintenance of internal control to prevent and detect fraud and error. I have disclosed to you:
• all the results of my assessment of the risk that the financial statements may be materially misstated as a result of fraud;
• all knowledge of fraud or suspected fraud affecting the Council involving:
 management and those charged with governance;
 employees who have significant roles in internal control; and
 others where fraud could have a material effect on the financial statements.
I have disclosed to you all information in relation to any allegations of fraud, or suspected fraud, affecting the Council's financial statements communicated by employees, former employees, analysts, regulators or others.
Related party transactions
I confirm that all related party relationships, transactions and balances, have been appropriately accounted for and disclosed in accordance with the Part VII of the Local Government (Scotland) Act 1973 and UK adopted
international accounting standards, as interpreted and adapted by the Code of Practice on Local Authority Accounting in the United Kingdom 2022/23 (the 2022/23 Code).
I have disclosed to you the identity of the Council’s related parties and all related party relationships and transactions of which I are aware.
Future commitments
I am not aware of any plans, intentions or commitments that may materially affect the carrying value or classification of assets and liabilities or give rise to additional liabilities.

Page 67

67
Appendix A: Draft management representation letter
Ultimate parent company
I confirm that the ultimate parent company for Argyll and Bute Council and its Group is the Scottish Government.
Other Matters
I confirm in relation to the following matters that:
• COVID-19 – I have assessed the continued impact of the COVID-19 Virus pandemic on the Council and the financial statements and those of the Group, including the impact of mitigation measures and uncertainties, and am
satisfied that the financial statements and supporting notes fairly reflect that assessment.
• Ukraine – I confirm that I have carried out an assessment of the potential impact of the continued conflict in Ukraine on the Council and its Group and there is no significant impact on the Council’s operations from restrictions or
sanctions in place.
• I confirm that I have assessed the impact on the Council of the on-going Global Banking challenges, in particular whether there is any impact on the Council and its Group’s ability to continue as a going concern, and on the
post balance sheet events disclosures.
Going concern
To the best of my knowledge there is nothing to indicate that the Council and its Group will not continue as a going concern in the foreseeable future. The period to which I have paid particular attention in assessing the
appropriateness of the going concern basis is not less than twelve months from the date of approval of the accounts.
Performance related allocations
I confirm that I am not aware of any reason why the Council’s funding allocation limits would be changed.
Subsequent events
I confirm all events subsequent to the date of the financial statements and for which the Part VII of the Local Government (Scotland) Act 1973 and UK adopted international accounting standards, as interpreted and adapted by the
Code of Practice on Local Authority Accounting in the United Kingdom 2022/23 (the 2022/23 Code), require adjustment or disclosure have been adjusted or disclosed.
Should further material events occur after the date of this letter which may necessitate revision of the figures included in the financial statements or inclusion of a note thereto, I will advise you accordingly.
Annual Governance Statement
I am satisfied that the Annual Governance Statement fairly reflects the Council and its Group's risk assurance and governance framework and I confirm that I am not aware of any significant risks that are not disclosed within the
Annual Governance Statement.
Annual Report
The disclosures within the Annual Report and the Remuneration Report fairly reflect my understanding of the Council and its Group’s financial and operating performance over the period covered by the financial statements.
Unadjusted misstatements
I confirm that the effects of the unadjusted misstatements are immaterial, both individually and in aggregate, to the financial statements as a whole.
Yours faithfully
Kirsty Flanagan
Section 95 Officer

Page 68

68
Appendix B: Draft audit report
Independent auditor’s report to the members of Argyll and Bute Council and the Accounts Commission
Report on the audit of the financial statements
Opinion on the financial statements
We certify that we have audited the financial statements in the annual accounts of Argyll and Bute Council and its group for the year ended 31 March 2023 under Part VII of the Local Government (Scotland) Act 1973. The financial
statements comprise the Statement of Comprehensive Income and Expenditure, the Balance Sheet, the Statement of Movement in Reserves, the Cash Flow Statement and notes to the financial statements, including significant
accounting policies, the Group Statement of Comprehensive Income and Expenditure, the Group Balance Sheet, the Group Statement of Movement in Reserves, the Group Cash Flow Statement and notes to the group financial
statements, including significant accounting policies. The financial reporting framework that has been applied in their preparation is applicable law and UK adopted international accounting standards, as interpreted and adapted by
the Code of Practice on Local Authority Accounting in the United Kingdom 2022/23 (the 2022/23 Code).
In our opinion the accompanying financial statements:
• give a true and fair view of the state of affairs of Argyll and Bute Council (the Council) and its group as at 31 March 2023 and of its income and expenditure for the year then ended;
• have been properly prepared in accordance with UK adopted international accounting standards, as interpreted and adapted by the 2022/23 Code; and
• have been prepared in accordance with the requirements of the Local Government (Scotland) Act 1973, The Local Authority Accounts (Scotland) Regulations 2014, and the Local Government in Scotland Act 2003.
Basis for opinion
We conducted our audit in accordance with applicable law and International Standards on Auditing (UK) (ISAs (UK)), as required by the Code of Audit Practice approved by the Accounts Commission for Scotland. Our
responsibilities under those standards are further described in the auditor’s responsibilities for the audit of the financial statements section of our report. We were appointed by the Accounts Commission on 18 May 2022. Our
period of appointment is five years, covering 2022/23 to 2026/27. We are independent of the Council and its group in accordance with the ethical requirements that are relevant to our audit of the financial statements in the UK
including the Financial Reporting Council’s Ethical Standard, and we have fulfilled our other ethical responsibilities in accordance with these requirements. Non-audit services prohibited by the Ethical Standard were not provided to
the Council and its group. We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our opinion.
Conclusions relating to going concern basis of accounting
We have concluded that the use of the going concern basis of accounting in the preparation of the financial statements is appropriate.
Based on the work we have performed, we have not identified any material uncertainties relating to events or conditions that, individually or collectively, may cast significant doubt on the Council and its group’s ability to continue to
adopt the going concern basis of accounting for a period of at least twelve months from when the financial statements are authorised for issue.
These conclusions are not intended to, nor do they, provide assurance on the Council and its group’s current or future financial sustainability. However, we report on the Council’s  arrangements for financial sustainability in a
separate Annual Audit Report available from the Audit Scotland website.
Risks of material misstatement
We report in our Annual Audit Report the most significant assessed risks of material misstatement that we identified and our judgements thereon.
Responsibilities of the Section 95 Officer and the Audit and Scrutiny Committee for the financial statements
As explained more fully in the Statement of Responsibilities, the Section 95 Officer is responsible for the preparation of financial statements, that give a true and fair view in accordance with the financial reporting framework, and
for such internal control as the Section 95 Officer determines is necessary to enable the preparation of financial statements that are free from material misstatement, whether due to fraud or error.

Page 69

69
Appendix B: Draft audit report
In preparing the financial statements, the Section 95 Officer is responsible for assessing each year the Council and its group’s ability to continue as a going concern, disclosing, as applicable, matters related to going concern and
using the going concern basis of accounting unless there is an intention to discontinue the Council and its group’s operations.
The Audit and Scrutiny Committee is responsible for overseeing the financial reporting process.
Auditor’s responsibilities for the audit of the financial statements
Our objectives are to obtain reasonable assurance about whether the financial statements as a whole are free from material misstatement, whether due to fraud or error, and to issue an auditor’s report that includes our opinion.
Reasonable assurance is a high level of assurance but is not a guarantee that an audit conducted in accordance with ISAs (UK) will always detect a material misstatement when it exists. Misstatements can arise from fraud or
error and are considered material if, individually or in the aggregate, they could reasonably be expected to influence the decisions of users taken on the basis of these financial statements.
Irregularities, including fraud, are instances of non-compliance with laws and regulations. We design procedures in line with our responsibilities outlined above to detect material misstatements in respect of irregularities, including
fraud. Procedures include:
• using our understanding of the local government sector to identify that the Local Government (Scotland) Act 1973, The Local Authority Accounts (Scotland) Regulations 2014, and the Local Government in Scotland Act 2003
are significant in the context of the Council and its group;
• inquiring of the Section 95 Officer as to other laws or regulations that may be expected to have a fundamental effect on the Council and its group;
• inquiring of the Section 95 Officer concerning the Council’s policies and procedures regarding compliance with the applicable legal and regulatory framework;
• discussions among our audit team on the susceptibility of the financial statements to material misstatement, including how fraud might occur; and
• considering whether the audit team collectively has the appropriate competence and capabilities to identify or recognise non-compliance with laws and regulations.
The extent to which our procedures are capable of detecting irregularities, including fraud, is affected by the inherent difficulty in detecting irregularities, the effectiveness of the Council and its group’s controls, and the nature,
timing and extent of the audit procedures performed.
Irregularities that result from fraud are inherently more difficult to detect than irregularities that result from error as fraud may involve collusion, intentional omissions, misrepresentations, or the override of internal control. The
capability of the audit to detect fraud and other irregularities depends on factors such as the skillfulness of the perpetrator, the frequency and extent of manipulation, the degree of collusion involved, the relative size of individual
amounts manipulated, and the seniority of those individuals involved.
A further description of the auditor’s responsibilities for the audit of the financial statements is located on the Financial Reporting Council's website http://www.frc.org.uk/auditorsresponsibilities. This description forms part of our
auditor’s report.
Reporting on other requirements
Opinion prescribed by the Accounts Commission on the audited parts of the Remuneration Report
We have audited the parts of the Remuneration Report described as audited. In our opinion, the audited parts of the Remuneration Report have been properly prepared in accordance with The Local Authority Accounts (Scotland)
Regulations 2014.
Other information
The Section 95 Officer is responsible for the other information in the annual accounts. The other information comprises the Management Commentary, Annual Governance Statement, Statement of Responsibilities and the
unaudited part of the Remuneration Report.

Page 70

70
Appendix B: Draft audit report
Our responsibility is to read all the other information and, in doing so, consider whether the other information is materially inconsistent with the financial statements or our knowledge obtained in the course of the audit or otherwise
appears to be materially misstated. If we identify such material inconsistencies or apparent material misstatements, we are required to determine whether this gives rise to a material misstatement in the financial statements
themselves. If, based on the work we have performed, we conclude that there is a material misstatement of this other information, we are required to report that fact.
We have nothing to report in this regard.
Our opinion on the financial statements does not cover the other information and we do not express any form of assurance conclusion thereon except on the Management Commentary and Annual Governance Statement to the
extent explicitly stated in the following opinions prescribed by the Accounts Commission.
Opinions prescribed by the Accounts Commission on the Management Commentary and Annual Governance Statement
In our opinion, based on the work undertaken in the course of the audit:
• the information given in the Management Commentary for the financial year for which the financial statements are prepared is consistent with the financial statements and that report has been prepared in accordance with
statutory guidance issued under the Local Government in Scotland Act 2003; and
• the information given in the Annual Governance Statement for the financial year for which the financial statements are prepared is consistent with the financial statements and that report has been prepared in accordance
with the Delivering Good Governance in Local Government: Framework (2016).
Matters on which we are required to report by exception
We are required by the Accounts Commission to report to you if, in our opinion:
• adequate accounting records have not been kept; or
• the financial statements and the audited part of the Remuneration Report are not in agreement with the accounting records; or
• we have not received all the information and explanations we require for our audit.
We have nothing to report in respect of these matters.
Conclusions on wider scope responsibilities
In addition to our responsibilities for the annual accounts, our conclusions on the wider scope responsibilities specified in the Code of Audit Practice, including those in respect of Best Value, are set out in our Annual Audit Report.
Use of our report
This report is made solely to the parties to whom it is addressed in accordance with Part VII of the Local Government (Scotland) Act 1973 and for no other purpose. In accordance with paragraph 108 of the Code of Audit Practice,
we do not undertake to have responsibilities to members or officers, in their individual capacities, or to third parties.
Cameron Waddell
For and on behalf of Mazars LLP
Mazars LLP
26 Mosley Street
Newcastle upon Tyne
NE1 1DF

Page 71

Appendix C: Independence
As part of our ongoing risk assessment we monitor our relationships with you to identify any
new actual or perceived threats to our independence within the regulatory or professional
requirements governing us as your auditors.
We can confirm that no new threats to independence have been identified since issuing the
Audit Strategy Memorandum and therefore we remain independent.
71

Page 72

Appendix C: Independence (continued)
Fees for work as the Council’s auditor
We reported our proposed fees for the delivery of our work under the Code of Audit Practice
in our Audit Strategy Memorandum presented to the Audit Committee on 20 June 2023. We
were appointed as auditors for the Council in the 2022/23 financial therefore no comparatives
have been provided in the below table. Having completed our work for the 2022/23 financial
year, we can confirm that our fees are as follows: 
Area of work 2022/23 fees
Auditor remuneration £237,440
Pooled costs £0
Contribution to PABV costs £57,770
Audit support costs £9,000
Sectoral cap adjustment (£2,030)
Sub-Total 306,240
Additional fees in respect of additional testing to reflect the
transition to a new ledger in 2022/23 4,225
Total fees £310,465
Fees for other work
We confirm that we have not undertaken any non-audit services for the Council.
Fees for audit of Charitable Trusts
The audit fee in table above does not include the cost of auditing the Council’s
charitable trusts. The Fee for these was £6,500.
Services provided to other entities within the Council’s group
We provided the external audit of the following entities within the Council’s group:
• Argyll and Bute Integration Joint Board (total fee of £31,470)
• Dunbartonshire and Argyll & Bute Valuation Joint Board (total fee of £8,790).
• Live Argyll (estimated total fee for 2022/23 of £16,000).
72

Page 73

Appendix D: Other communications
Other communication Response
Compliance with Laws
and Regulations
We have not identified any significant matters involving actual or suspected non-compliance with laws and regulations.
We will obtain written representations from management that all known instances of non-compliance or suspected non-compliance with laws and
regulations whose effects should be considered when preparing financial statements have been disclosed.
External confirmations
We did not experience any issues with respect to obtaining external confirmations.
Related parties
We did not identify any significant matters relating to the audit of related parties.
We will obtain written representations from management confirming that:
a. they have disclosed to us the identity of related parties and all the related party relationships and transactions of which they are aware; and
b. they have appropriately accounted for and disclosed such relationships and transactions in accordance with the requirements of the
applicable financial reporting framework.
Going concern
We have not identified any evidence to cause us to disagree with the Section 95 Officer that Argyll and Bute Council will be a going concern, and
therefore we consider that the use of the going concern assumption is appropriate in the preparation of the financial statements.
We will obtain written representations from management, confirming that all relevant information covering a period of at least 12 months from the
date of approval of the financial statements has been taken into account in assessing the appropriateness of the going concern basis of
preparation of the financial statements.

Page 74

Appendix D: Other communications (continued)
Other communication Response
Subsequent events
We are required to obtain evidence about whether events occurring between the date of the financial statements and the date of the auditor’s report
that require adjustment of, or disclosure in, the financial statements are appropriately reflected in those financial statements in accordance with the
applicable financial reporting framework.
We will obtain written representations from management that all events occurring subsequent to the date of the financial statements and for which
the applicable financial reporting framework requires adjustment or disclosure have been adjusted or disclosed.
Matters related
to fraud
We have designed our audit approach to obtain reasonable assurance whether the financial statements as a whole are free from material
misstatement due to fraud. In addition, we have assessed the adequacy of the Council’s arrangements for preventing and detecting fraud or other
irregularities as part of the wider scope audit and concluded that they are sufficiently designed and implemented.
We will obtain written representations from management, and the Audit Committee, confirming that:
a. they acknowledge their responsibility for the design, implementation and maintenance of internal control to prevent and detect fraud;
b. they have disclosed to the auditor the results of management’s assessment of the risk that the financial statements may be materially misstated
as a result of fraud;
c. they have disclosed to the auditor their knowledge of fraud or suspected fraud affecting the entity involving:
i. Management;
ii. Employees who have significant roles in internal control; or
iii. Others where the fraud could have a material effect on the financial statements; and
d. they have disclosed to the auditor their knowledge of any allegations of fraud, or suspected fraud, affecting the entity’s financial statements
communicated by employees, former employees, analysts, regulators or others.
National Fraud
Initiative
The National Fraud Initiative (NFI) in Scotland is a counter-fraud exercise led by Audit Scotland and overseen by the UK’s Cabinet Office, designed
to prevent and detect fraud. The NFI uses data analytics to compare information held on individual by different public bodies to highlight the
existence of fraud or error.
The Council has received matches for investigation in 2023 and followed up on the 2 high risk cases. We have monitored the Council’s
participation and progress during the 2022/23 audit. During the 22/23 NFI exercise, the Council closed 77% of all high-risk matches processed.
74

Page 75

Appendix E: Wider scope and Best Value ratings
We need to gather sufficient evidence to support our commentary on the Council’s arrangements and to identify and report on any risks. We will carry out more detailed work where
we identify significant risks. Where significant risks are identified we will report these to the Council and make recommendations for improvement. In addition to local risks, we
consider challenges that are impacting the public sector as a whole.
We have assigned priority rankings to each of the risks identified to reflect the importance that we consider each poses to your organisation and, hence, our recommendation in terms
of the urgency of required action. The table below describes the meaning behind each rating that we have awarded to each wider scope area based on the work we have performed.
Rating Description
Level 1 The identified risk and/or significant deficiency is critical to the
business processes or the achievement of business strategic
objectives. There is potential for financial loss, damage to
reputation or loss of information. The recommendation should
be taken into consideration by management immediately.
Level 2 The identified risk and/or significant deficiency may impact on
individual objectives or business processes. The audited body
should implement the recommendation to strengthen internal
controls or enhance business efficiency. The recommendations
should be actioned in the near future.
Level 3 The identified risk and/or significant deficiency is an area for
improvement or less significant. In our view, the audited body
should action the recommendation, but management do not
need to prioritise.
75

Page 76

Mazars
Mazars is an internationally integrated partnership, specialising in audit, accountancy, advisory, tax
and legal services*. Operating in over 90 countries and territories around the world, we draw on the
expertise of 40,400 professionals – 24,400 in Mazars’ integrated partnership and 16,000 via the
Mazars North America Alliance – to assist clients of all sizes at every stage in their development.
*where permitted under applicable country laws.
26 Mosley Street
Newcastle upon Tyne
NE1 1DF
Follow us:
LinkedIn:
www.linkedin.com/company/Mazars
Twitter:
www.twitter.com/MazarsGroup
Facebook:
www.facebook.com/MazarsGroup
Instagram:
www.instagram.com/MazarsGroup
WeChat:
ID: Mazars
Cameron Waddell (Audit Partner)