Democracy Spraffa

2023_24_InternalAudit_PiersandHarbours_Final_Report

Argyll and Bute Council · 14 March 2024
Back to Audit and Scrutiny Committee — 14 March 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council
Internal Audit Report
February 2024
FINAL 
High Medium Low VFM
Number of
Findings
0 0 8 0 
Piers and Harbours
Audit Opinion: Reasonable

Page 2

2 
Argyll and Bute Council – Internal Audit Report – Piers and Harbours, February 2024 
Contents 
1. Executive Summary ........................................................................................................................ 3
Introduction ............................................................................................................................................ 3
Background ............................................................................................................................................. 3
Scope ....................................................................................................................................................... 4
Risks ........................................................................................................................................................ 4
Audit Opinion ......................................................................................................................................... 4
Recommendations ................................................................................................................................. 4
2. Objectives and Summary Assessment ........................................................................................... 5
3. Detailed Findings ............................................................................................................................ 7
Appendix 1 – Action Plan ..................................................................................................................... 10
Appendix 2 – Audit Opinion ................................................................................................................. 13 
Contact Details 
Internal Auditor: Moira Weatherstone 
Telephone:  01546 604146 
e-mail:   moira.weatherstone@argyll-bute.gov.uk 
www.argyll-bute.gov.uk

Page 3

3 
Argyll and Bute Council – Internal Audit Report – Piers and Harbours, February 2024
1. Executive Summary
Introduction
1. As part of the 2023/24 internal audit plan, approved by the Audit & Scrutiny Committee in
March 2023, we have undertaken an audit of Argyll and Bute Council’s (the Council) system of
internal control and governance in relation to Piers and Harbours. 
2. The audit was conducted in accordance with the Public Sector Internal Audit Standards (PSIAS)
with our conclusions based on discussions with council officers and the information available at
the time the fieldwork was performed. The findings outlined in this report are only those which
have come to our attention during the course of our normal audit work and are not necessarily
all the issues which may exist. Appendix 1 to this report includes agreed actions to strengthen
internal control however it is the responsibility of management to determine the extent of the
internal control system appropriate to the Council. 
3. The contents of this report have been agreed with the appropriate council officers to confirm
factual accuracy and appreciation is due for the cooperation and assistance received from all
officers over the course of the audit.
Background
4. Argyll & Bute Council (the Council) own and manages a number of piers and harbours. As a
Statutory Harbour Authority the Council is responsible for running the 39 operational ports and
harbours throughout Argyll, including the 7 main piers and harbours. In addition the Council
operates 4 lifeline ferry service to island communities of Jura, Lismore, Luing and Easdale. Piers
and harbours across Argyll see a lot of activity during the course of the year both through
commercial and leisure use. Due to the location of Argyll, one of the main industries is fishing,
along with the transportation of goods, vehicles and passengers via the sea.  There are also
many passenger ferries pass throughout our ports and harbours.   
5. The Council, as a Statutory Harbour Authority is empowered to levy dues under Section 26 of the
Harbours Act 1964 and Sections 25-33 of the Harbours, Docks and Piers Clauses Act 1847. 
Vessels that wish to use or are laid up at any of the Council piers and harbours are subject to
paying dues.  The Council receives most of its piers and harbours income from fees and charges
from larger vessels and CalMac (CFL).   
6. A schedule of rate and dues to be levied at piers, harbours and ferry slips under the Harbours
Act 1964, is prepared and approved by the Council as part of the Annual Revenue Budget. Piers,
harbours and ferry fees and charges are published on an annual basis on the Council’s website. 
7. Oban is the hub for lifeline transport connections to the islands, primarily Tiree, Coll, Kerrera,
Lismore, Mull and also Colonsay, Barra and South Uist (winter). The Council has submitted an
application to the Scottish Government for the extension of their Statutory Harbour Authority
responsibilities to include the whole of Oban Bay. The Oban Harbour Revision Order (HRO), if
successful, will increase income from Conservancy charges by a projected £250k per annum.
(these are made on non-leisure craft and are to cover the costs of maintaining the port and the

Page 4

4 
Argyll and Bute Council – Internal Audit Report – Piers and Harbours, February 2024
duties required of the Harbour Authority (whomever that may be) in keeping the Port safe and
open for business). 
Scope 
8. The scope of the audit was to review charging and income arising from piers and harbour dues
as outlined in the Terms of Reference agreed with the Head of Roads & Infrastructure in July
2023.
Risks
9.  The risks considered throughout the audit were:
 Audit Risk 1: Failure to collect piers and harbour dues 
 Audit Risk 2: Failure to maximise income targets
Audit Opinion
10. We provide an overall audit opinion for all the audits we conduct. This is based on our
judgement on the level of assurance which we can take over the established internal controls,
governance and management of risk as evidenced by our audit work.  Full details of the five
possible categories of audit opinion is provided in Appendix 2 to this report. 
11. Our overall audit opinion for this audit is that we can take a reasonable level of assurance.  This
means that internal control, governance and the management of risk are broadly reliable.
However, whilst not displaying a general trend, there are areas of concern which have been
identified where elements of residual risk or weakness may put some of the system objectives at
risk.
Recommendations
12. We have highlighted 8 low priority recommendations where we believe there is scope to
strengthen the control and governance environment. These are summarised below:
 In order to ensure consistency of practice, standardised policies and procedures should
be put in place across all Council areas for the recording, collection and billing of fees
and charges;
 Calmac, the main ferry operator uses the Council’s Piers and Harbours on a daily basis,
with administratively intensive process in place for charging. The charging processes and
procedures for CalMac ferries should be reviewed in order to streamline the process;
 Consideration should be given to setting up SLA’s or Harbour Access Agreements with
the main commercial users of our piers and harbours; 
 Processes should be put in place to manage piers and harbours in the remote locations
throughout the Council area, including procedures to identify the commercial leisure
fleet/tour operators using the facilities to embark and disembark tourists;
 A review of the management of the fishing fleet landing fee procedures should be
undertaken with the Harbourmasters able to access information necessary to determine
the correct fee to be levied. In addition, consideration should be given to obtaining
confirmation of value of catch sold at market;

Page 5

5 
Argyll and Bute Council – Internal Audit Report – Piers and Harbours, February 2024
 Consideration should be given on how better to manage long term outstanding debt and
the management of the fleet who continue to access the Council’s facilities during a
period of continued indebtedness;
 A review of piers and harbour dues should be undertaken as part of the budget setting
process, whereby consideration should be given to identifying gaps in charges,
increasing charges where appropriate and which have been benchmarked against other
harbour authorities;
 Consideration should be given to publishing our fees and charges in a useable format to
ensure they are readily available to the users of Council’s facilities.
13. Full details of the audit findings, recommendations and management responses can be found in
Section 3 of this report and in the action plan at Appendix 1.
2. Objectives and Summary Assessment
14. Exhibit 1 sets out the control objectives identified during the planning phase of the audit and our
assessment against each objective.  
Exhibit 1 – Summary Assessment of Control Objectives 
Control Objective Link to Risk Assessment Summary Conclusion
1 Policies and
procedures are in
place for the
invoicing and
collection of piers
and harbour dues
Audit Risk 1 Reasonable Whilst localised process and
procedures are in place and are well
understood for the collection of piers
and harbour income there is no
centralised comprehensive policy or
procedure note that is consistently
applied across the Council areas. 
CalMac, the main ferry operator uses
the Council’s Piers and Harbours on a
daily basis, with administratively
intensive process in place for charging.
In addition there is no SLA or Harbour
Access Agreements in place for the
main users of the Council’s facilities.
2 Robust records are
maintained of all
pier and harbour
fees due
Audit Risk 1 Reasonable Harbourmasters based at the Council’s
larger piers and harbours are able to
record the use of the main facilities,
however, a number of piers, slipways
and harbours are in remote locations
and difficult to manage in terms of use. 
In addition, there are no robust
procedures in place to identify
commercial tour vessels using our
facilities potentially resulting in a loss
of income for the Council. Fees and
charges for the fishing fleet within the
Council area are managed by the
fishing fleet whereby they advise us of
the value of their landings once the
catch has been sold.  There is no back

Page 6

6 
Argyll and Bute Council – Internal Audit Report – Piers and Harbours, February 2024
up information provided to
substantiate the value and it is
generally paid through cash receipting
or by cheque.  
3 All income due to
the Council in
respect of piers and
harbours are
collected
Audit Risk 2 Reasonable Piers and Harbours income is managed
at a local level with a great deal of
reliance placed on the local knowledge
of the Harbour Master and staff. 
Debtor’s accounts are raised by a
members of Roads and Amenity staff
who have remote access to the Sundry
Debtors system. The outstanding debt
owed to the Council at the end of June
in respect of Piers and Harbours
amounted to £143k.  There are a
number of long term outstanding
debts and it was noted that in some
instances there is continued use of our
facilities by vessels who have
outstanding debts dating back to 2019.
4 Procedures are in
place for the
consideration and
setting of fees and
charges
Audit Risk 2 Reasonable Pier and harbour dues are set as part
of the budget setting process.  A report
is prepared by the Executive Director
responsible for Roads and
Infrastructure Services and is
presented to A&B Harbour Board.  The
report is then presented to the Policies
& Resources Committee, with any
proposed increase in the fees and
charges included in the Budget Pack.
The report is then presented to the full
Council meeting for agreement.   Pier
and harbour dues are standardised
charges and applicable across the
Council area.  Where most piers and
harbours are used by ferry providers or
the leisure industry, Campbeltown pier
and harbour is predominantly a
commercial harbour dealing with large
vessels loading and unloading cargo
therefore perhaps our current charging
policies do not take into account the
differences with other areas in Argyll.
We reviewed the fees and charges
agreed by the Council and compared
these to fees and charges applied in
other piers and harbour throughout
Scotland, including Clydeport. We
found that there were areas that the
Council were perhaps undercharging
and in others, not charging for at all in

Page 7

7 
Argyll and Bute Council – Internal Audit Report – Piers and Harbours, February 2024
comparison to that of other harbour
authorities. 
15. Further details of our conclusions against each control objective can be found in Section 3 of this
report.  
3. Detailed Findings
Policies and procedures are in place for the invoicing and collection of piers and harbour dues
16. Whilst localised processes and procedures are in place and are well understood for the collection
of piers and harbour income there is no centralised comprehensive policy or procedure note
that is consistently applied across the Council areas.  We were provided with written procedures
which had been brought together locally by Harbour Masters for use in their own local areas.   
Action Plan 1 
17. Calmac, the main ferry operator uses the Council’s Piers and Harbours on a daily basis, with
administratively intensive process in place for charging. In addition to standard charges, Calmac
advise, through the use of a purchase order, the numbers of passengers, cars, coaches and
commercial vehicles using the ferry service.  A 5% commission fee is deducted from all users,
providing a net fee due.  A debtor’s account is then processed by Council administration staff. 
We were advised that discussions are ongoing to consider how processes can be streamlined for
Calmac and the Council.                                  
Action Plan 2 
18. A number of companies, including large fish farming businesses make use of our facilities on a
regular basis, however, there are no SLA’s in place.  We were advised that work is currently
being undertaken to put Harbour Access Agreements in place.
Action Plan 3
Robust records are maintained of all pier and harbour fees due
19. Throughout Argyll there are a number of unmanned piers, harbours and slipways which are used
by the commercial leisure and fishing industry to land their catch or in the case of the leisure
industry, pick up and land passengers visiting Argyll’s remote and uninhabited islands. 
Harbourmasters based at the main piers and harbours are able to record the use of the facilities
where they are predominantly based, however, a number of piers, slipways and harbours are in
remote locations and are difficult to manage in terms of monitoring and use.  In addition, there
are no robust procedures in place to identify commercial tour vessels using our facilities
potentially resulting in a loss of income for the Council.     
Action Plan 4 
20. Fees and charges for the fishing fleet within the Council area are managed by the fishing fleet
whereby they advise us of the value of their landings once the catch has been sold.  There is no
back up information provided to substantiate the value and it is generally paid through cash
receipting or by cheque.  In addition, there are no robust records maintained of the fishing fleet
operating throughout Argyll & Bute with many of the remote unmanned piers, harbours and

Page 8

8 
Argyll and Bute Council – Internal Audit Report – Piers and Harbours, February 2024
slipways potentially used by the fishing fleet. Harbour Masters previously had oversight of the
fishing fleet catch and were able to maintain an overview of reasonableness of information
provided on the value of the catch throughout the year, highlighting any large variations. 
Action Plan 5
All income due to the Council in respect of piers and harbours are collected 
21. Piers and Harbours income is managed at a local level with a great deal of reliance placed on the
local knowledge of the Harbour Master and staff.  Staff are based at the main Piers and Harbours
throughout the Council area and have good knowledge of their facilities and users. 
22. Debtor’s accounts are raised by a member of Roads and Amenity staff who have remote access
to the Sundry Debtors system. Administration staff receive instructions from the Harbour Master
with regards to fees due. Ultimate control of debtor’s accounts sits with the Head of Financial
Services.
23. At the start of each month a debtor report is sent (including an aged debtors list), to the Admin
Officer – Roads and Infrastructure services. All outstanding debts are followed up through a
standard set of debtor procedures which outline the processes to be followed for outstanding
debts. The Head of Governance and Law is  responsible for effectiveness of recovery following
transfer of debt  to Legal Services for  collection and also for ensuring that legal action is carried
out within agreed timescales on all cases referred by Sundry Debt Team. 
24. The outstanding debt owed to the Council at the end of June in respect of Piers and Harbours
amounted to £143k.  There are a number of long term outstanding debts and it was noted that
in some instances there is continued use of our facilities by vessel(s) who have outstanding debts
dating back to 2019.                          
Action Plan 6
Procedures are in place for the consideration and setting of fees and charges
25. Pier and harbour dues are set as part of the budget setting process.  A report is prepared by the
Executive Director responsible for Roads and Infrastructure Services.  For the 2023/24 fees the
report prepared was presented to the special meeting of A&B Harbour Board in December 2022
whereby the Harbour Board gave consideration to the report in respect of a necessary increase
in fees and charges for the financial year 2023/2024. The Harbour Board decided to recommend
to the Council, when setting the fees and charges for 2023/2024 that it approves an increase to
piers and harbours fees and charges of 5%, over and above an inflationary increase which would
be ring fenced to develop the Council’s marine infrastructure. The Council budget pack was
presented to the Policy & Resource Committee in February 2023 and it was agreed to refer
consideration of the Budgeting Pack 2023-24 to the Council meeting on 23 February 2023. The
budget pack outlined the proposal for Harbour Fees to be increased by a total of 11%. This 11%
increase is split between a 6% general inflationary increase and additional 5%. This additional
increase over and above the general inflationary increase is estimated to generate additional
income of £0.419m”. 
26. Piers and harbour dues are standardised charges applicable across the Council area.  Where
most piers and harbours across the Council area are used by ferry providers or the leisure
industry, Campbeltown pier and harbour is predominantly a commercial harbour.

Page 9

9 
Argyll and Bute Council – Internal Audit Report – Piers and Harbours, February 2024 
27. We reviewed the fees and charges agreed by the Council and compared these to fees and
charges applied in other piers and harbour throughout Scotland, including Clydeport. It was
found that there were potential gaps in terms of:   
 Campbeltown is predominantly a commercial port with a large number of large
commercial vessels, particularly cargo vessels, operating from the Pier.  In comparison
with other ports it would appear that the Council’s fees and charges are lower, in
particular rope handling fees.  It was highlighted that if Harbourmasters were required
to attend the pier out of hours to bring a vessel onto the pier, the rope handling fees, at
times, did not cover the costs of the overtime for staff;
 Throughout Argyll, at times, there is a large amount of fishing gear and creels left on the
piers and slipways, often in the more remote facilities which are not easily managed.  It
is an ongoing problem for staff clearing the areas and often the fishing gear and creels
subsequently are placed back on the facilities.  Other harbour authorities charge for the
storage of fishing gear and creels;   
 There is a growing desire for cruise ships, large and small to visit key locations
throughout Argyll.  Unlike other harbour authorities, there is currently no fee charged
for vessels conveying their passengers ashore and tying up alongside our slipways and
piers. In addition, where security is provided at the main harbours for large cruise ships
conveying their passengers ashore, we do not currently charge for this service. 
Action Plan 7 
28. Harbour fees and dues are published on the Council website on an annual basis following being
agreed and set at the Council’s budget setting meeting, however, these are not in a format that
can be easily downloaded.            
Action Plan 8

Page 10

Appendix 1 – Action Plan 
No Finding Risk Agreed Action Responsibility / Due Date
Low 1
Processes and Procedures 
Whilst localised process and procedures are in place and
are well understood for the collection of piers and harbour
income dues there is no centralised comprehensive policy
or procedure note that is consistently applied across the
Council areas.  
Inconsistencies in practice
across the areas within the
authority’s geographical
boundary.
Produce a ‘Policy’ for inclusion in
the MSMS.
Officer title: Marine
Operations Manager 
Date: 30 September 2024 
Low 2
CalMac Charges 
Calmac, the main ferry operator uses the Council’s Piers
and Harbours on a daily basis, with administratively
intensive process in place for charging. 
Inefficiencies in processes Have an agreement (financial) in
place by the end of the year.
Officer title: Marine
Operations Manager 
Date: November 2024 for
approval at December
Harbour Board 
Low 3
SLA’s 
A number of companies, including large fish farming
businesses make use of our facilities on a regular basis,
however, there are no SLA’s in place.  We were advised
that work is currently being undertaken to put Harbour
Access Agreements in place.
Potential lack of
understanding of services
expected and provided
Any agreement must be
supported by both parties and
Argyll & Bute Council legal
department. May tie in with No 2
above. Provide a report to HoS
and Director with options. 
1. Identify potential partners
2. Negotiation period
3. Legal support in drafting
agreement 
Officer title: Marine
Operations Manager 
Date: November 2024 for
approval at December
Harbour Board 
Low 4
Remote Piers and Harbours 
Harbourmasters based at the main piers and harbours are
able to record the use of the facilities where they are
predominantly based, however, a number of piers,
slipways and harbours are in remote locations and are
difficult to manage in terms of use.  In addition, there are
no robust procedures in place to identify commercial tour
vessels using our facilities potentially resulting in a loss of
income for the Council.
Potential loss of income to the
Council
Actionable evidence and
enforcement will continue to be
an issue where there are no Argyll
& Bute Council personnel on site.
Investigate issues and possible
solutions with Harbour Masters
and provide options for
consideration in report to DMT.
Officer title: Marine
Operations Manager 
Date: 30 September 2024

Page 11

11 
Argyll and Bute Council – Internal Audit Report – Piers and Harbours, February 2024 
No Finding Risk Agreed Action Responsibility / Due Date 
5
Fishing Fleet 
Fees and charges for the fishing fleet within the Council
area are managed by the fishing fleet whereby they advise
us of the value of their landings once the catch has been
sold.  There is no back up information provided to
substantiate the value and it is generally paid through cash
receipting or by cheque.  
Potential loss of income to the
Council
Investigate issues and possible
solutions with Harbour Masters
and provide options for
consideration in report to DMT.
Officer title: Marine
Operations Manager 
Date: 30 September 2024 
6
Management of Debt 
The outstanding debt owed to the Council at the end of
June in respect of Piers and Harbours amounted to £143k. 
There are a number of long term outstanding debts and it
was noted that in some instances there is continued use of
our facilities by vessels who have outstanding debts dating
back to 2019.
Loss of income to the Council Investigate with legal department
recovery or right off options.
Provide a report to HoS and
Director with options.
Officer title: Marine
Operations Manager 
Date: 30 September 2024 
7
Income Gaps 
We reviewed the fees and charges agreed by the Council
and compared these to fees and charges applied in other
piers and harbour throughout Scotland, including
Clydeport. It was found that there were potential gaps.
Potential gaps in income
streams for the Council
Complete a review of potential
new charges for Harbour Board
approval in Fees and charges
report
Officer title: Marine
Operations Manager 
Date: November 2024 for
approval at December
Harbour Board 
8
Published Pier and Harbour Dues and Fees 
Harbour fees and dues are published on the Council
website on an annual basis following being agreed and set
at the Council’s budget setting meeting, however, these
are not in a format that can be easily downloaded.
Lack of accessibility of
information
Produce a ‘Schedule of Harbour
Charges’ for Harbour Board
approval
Officer title: Marine
Operations Manager 
Date: November 2024 for
approval at December
Harbour Board

Page 12

12 
Argyll and Bute Council – Internal Audit Report – Piers and Harbours, February 2024
In order to assist management in using our reports a system of grading audit findings has been adopted to allow the significance of findings to be ascertained.  The
definitions of each classification are as follows: 
Grading    Definition
High  A major observation on high level controls and other important internal controls or a significant matter relating to the critical success of the
objectives of the system.  The weakness may therefore give rise to loss or error. 
Medium 
Observations on less significant internal controls and/or improvements to the efficiency and effectiveness of controls which will assist in meeting
the objectives of the system.  The weakness is not necessarily substantial however the risk of error would be significantly reduced if corrective
action was taken.  
Low  Minor recommendations to improve the efficiency and effectiveness of controls or an isolated issue subsequently corrected.  The weakness does
not appear to significantly affect the ability of the system to meet its objectives. 
VFM  An observation which does not highlight an issue relating to internal controls but represents a possible opportunity for the council to achieve
better value for money (VFM).

Page 13

13 
Argyll and Bute Council – Internal Audit Report – Piers and Harbours, February 2024
Appendix 2 – Audit Opinion 
Level of Assurance  Definition 
High 
Internal control, governance and the management of risk are at a high standard. Only marginal elements of residual risk have
been identified with these either being accepted or dealt with. A sound system of control designed to achieve the system
objectives is in place and being applied consistently. 
Substantial 
Internal control, governance and the management of risk is sound. However, there are minor areas of weakness which put some
system objectives at risk and specific elements of residual risk that are slightly above an acceptable level and need to be
addressed within a reasonable timescale. 
Reasonable 
Internal control, governance and the management of risk are broadly reliable. However, whilst not displaying a general trend,
there are areas of concern which have been identified where elements of residual risk or weakness may put some of the system
objectives at risk. 
Limited 
Internal control, governance and the management of risk are displaying a general trend of unacceptable residual risk above an
acceptable level and placing system objectives are at risk. Weakness must be addressed with a reasonable timescale with
management allocating appropriate resources to the issues raised. 
No Assurance 
Internal control, governance and the management of risk is poor. Significant residual risk and/or significant non-compliance with
basic controls exists leaving the system open to error, loss or abuse. Residual risk must be addressed immediately with
management allocating appropriate resources to the issues.