Democracy Spraffa

2023_24_Learning+PhysicalDisabilityCarePackages_Report_FINAL

Argyll and Bute Council · 13 June 2024
Back to Audit and Scrutiny Committee — 13 June 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council
Internal Audit Report
April 2024
FINAL 
High Medium Low VFM
Number of
Findings
0 7 0 0 
Learning and Physical
Disability Care Packages 
Audit Opinion: (Reasonable)

Page 2

2 
Argyll and Bute Council – Internal Audit Report – Learning and Physical Disability Care Packages
April 2024 
Contents 
1. Executive Summary ........................................................................................................................ 3
Introduction ............................................................................................................................................ 3
Background ............................................................................................................................................. 3
Scope ....................................................................................................................................................... 4
Risks ........................................................................................................................................................ 4
Audit Opinion ......................................................................................................................................... 4
Recommendations ................................................................................................................................. 5
2. Objectives and Summary Assessment ........................................................................................... 5
3. Detailed Findings ............................................................................................................................ 7
Appendix 1 – Action Plan ..................................................................................................................... 12
Appendix 2 – Audit Opinion ................................................................................................................. 16 
Contact Details 
Internal Auditor: Moira Weatherstone 
Telephone:  01546 604146 
e-mail:   moira.weatherstone@argyll-bute.gov.uk 
www.argyll-bute.gov.uk

Page 3

3 
Argyll and Bute Council – Internal Audit Report – Learning and Physical Disability Care Packages
April 2024
1. Executive Summary
Introduction
1. As part of the 2023/24 internal audit plan, approved by the Audit & Scrutiny Committee in
March 2023, we have undertaken an audit of Argyll and Bute Council’s (the Council) system of
internal control and governance in relation to Learning and Physical Disability Care Packages. 
2. The audit was conducted in accordance with the Public Sector Internal Audit Standards (PSIAS)
with our conclusions based on discussions with council officers and the information available at
the time the fieldwork was performed. The findings outlined in this report are only those which
have come to our attention during the course of our normal audit work and are not necessarily
all the issues which may exist. Appendix 1 to this report includes agreed actions to strengthen
internal control however it is the responsibility of management to determine the extent of the
internal control system appropriate to the Council. 
3. The contents of this report have been agreed with the appropriate council officers to confirm
factual accuracy and appreciation is due for the cooperation and assistance received from all
officers over the course of the audit. 
Background 
4. Learning Disability services provide essential person centred support for individuals by helping
people with learning disabilities and complex conditions to access and continue education and
development, paid employment opportunities, life skills development and meaningful activities,
achieve their desired outcomes and become more involved in their communities. They also
promote and support independent living skills. 
5. Providing effective support for people with learning in ways that address their personal
outcomes is a priority for the HSCP.  However, with a shrinking population, recruitment and
retention of health and social care staff and rurality of Argyll and Bute, this presents many
challenges to the delivery of services. Whenever possible, the HSCP support people to live
healthily and well within their local communities, with their families and friends.   
6. Care Management is a term applied to an approach to intervention whereby a professionally
qualified social work officer undertakes assessment, planning, monitoring and reviewing activity.
The assessment process for services involves engaging and communicating with individuals to
identify their strengths, needs, risks, capacity and aspirations with a view to determining how
social work intervention could assist in meeting desired outcomes. Central to the process is the
collation, analysis and interpretation of information. This approach has a strong focus on
managing risk, the use of specific interventions and /or significant complexity will exist e.g. legal
matters. It is only applicable to people who are most vulnerable, have complex or frequently
changing needs or who present public protection concerns.   
7. There are approximately 377 Adults living with a learning disability and/or autism spectrum
diagnosis known to Argyll & Bute Health and Social Care Partnership (HSCP) within Argyll and
Bute. Both nationally and locally the number of people with learning disabilities living into older
age is increasing, with many presenting with a diverse range of complex and multiple
interrelated health conditions. This growing population with complex health needs brings about

Page 4

4 
Argyll and Bute Council – Internal Audit Report – Learning and Physical Disability Care Packages
April 2024
new challenges for health professionals and social care services. The planning and provision of
quality health and social care is crucial to improving the health and quality of life of people with
learning and physical disabilities across Argyll and Bute.  In addition the Council faces challenges,
particularly in more rural locations due to the limited number of care providers who are able to
provide the required services. 
8. A defined amount of money is set aside in the budget for the provision of care services and
resources are allocated according to a priority of needs.  There are currently 63 Learning
Disability/Physical Disability and Mental Health packages in excess of £100k per year and for the
financial year ended 31 March 2023 this amounted to approximately £9.190m, just under half of
the overall £20.206m spent on care packages in 2022/23. 
9. There are currently 50 individuals placed out with Argyll and Bute with care packages totalling
approximately £5 million per annum.  Compared to a number of other local authorities there is
likely to be a higher number of out of area placements due to the lack of service provision across
the Council’s remote and rural geographic area.   
Scope 
10. The scope of the audit was to review of the management and governance of learning disability
high cost packages as outlined in the Terms of Reference agreed with the Head of Adult Services
(Mental Health, Acute and Complex Care) on 30 August 2023. 
Risks 
11.  The risks considered throughout the audit were: 
 SRR07:  Failure of the HSCP to deliver on its Strategic Priorities results in deteriorating
health and wellbeing outcomes for the population and / or reduced access to appropriate
health and social care services. This could also result in financial and reputational risk to
the Council
 Audit Risk 1: Failure to meet our statutory requirements
 Audit Risk 2: Failure to provide an effective assessment and review process
Audit Opinion 
12. We provide an overall audit opinion for all the audits we conduct. This is based on our
judgement on the level of assurance which we can take over the established internal controls,
governance and management of risk as evidenced by our audit work.  Full details of the five
possible categories of audit opinion is provided in Appendix 2 to this report. 
13. Our overall audit opinion for this audit is that we can take a reasonable level of assurance.  This
means that internal control, governance and the management of risk are broadly reliable.
However, whilst not displaying a general trend, there are areas of concern which have been
identified where elements of residual risk or weakness may put some of the system objectives at
risk.

Page 5

5 
Argyll and Bute Council – Internal Audit Report – Learning and Physical Disability Care Packages
April 2024
Recommendations 
14. We have highlighted 7 medium priority recommendations where we believe there is scope to
strengthen the control and governance environment. These are summarised below:
 Policies and procedures should be reviewed to ensure they are up to date, relevant and
reflect the new practices within Eclipse;
 An induction pack is in the process of being developed and this will include an
introduction to policies and procedures. The induction pack should be completed and
circulated to all new staff;
 Staff should be reminded of the importance of keeping case notes and contact notes up
to date;
 Client records should be maintained in a consistent way across the Council, minimising
the number of locations where records are maintained. The Business Case for the roll
out of the client record keeping project onto CIVICA, with links provided in Eclipse
should be implemented;
 Robust measures should be put in place for the decision making processes for allocating
resources for Learning Disability Care packages, including processes for recording those
decisions;
 Systems, processes and commissioning contracts must be put in place to ensure the
equity of access to personal care services for Learning Disability Services;
 A robust system of identifying and recording unmet needs with regards to Learning
Disability clients should be put in place. 
15. Full details of the audit findings, recommendations and management responses can be found in
Section 3 of this report and in the action plan at Appendix 1. 
2. Objectives and Summary Assessment 
16. Exhibit 1 sets out the control objectives identified during the planning phase of the audit and our
assessment against each objective.  
Exhibit 1 – Summary Assessment of Control Objectives 
Control Objective Link to Risk Assessment Summary Conclusion
1 Care Assessment
policies and
procedures are in
place
SRR07
Audit Risk 1
Audit Risk 2
Reasonable Care Assessment policies and
procedures are in place with a number
of key documents provided for review,
although these may not refer current
practice and refer to Carefirst. 
Assessment and Care Planning
Procedures’ (V1) details that the
purpose of the policy, procedures and
practice guidance is to improve
outcomes for service users and carers
by providing clear guidance for social
work staff about assessment and
planning with individuals. This
guidance applies to community
services service users and is applicable

Page 6

6 
Argyll and Bute Council – Internal Audit Report – Learning and Physical Disability Care Packages
April 2024
across all settings. An induction pack is
in the process of being developed and
this will include an introduction to
policies and procedures.
2 All cases have been
assigned a Case
Manager and case
reviews are being
undertaken in
accordance with
policies and
procedures
Audit Risk 2 Reasonable High value care packages generally
relate to those who require lifelong
support either in a residential setting
or supported within their communities,
therefore there is very little change to
their care packages. Both nationally
and locally the number of people with
learning disabilities living into older
age is increasing, with many presenting
with a diverse range of complex and
multiple interrelated health conditions.  
Case reviews are undertaken when
there is significant changes to the
client’s care needs. Children with
Learning Disabilities are provided with
a full care assessment when they move
to Adult Services.  We reviewed a 9%
sample size of Learning Disability high
value care packages. Clients are
assigned a case manager, although
heavy reliance is placed on the care
providers reporting and updating the
case manager on a regularly basis.   
Where case managers were not
assigned, this was due to the allocated
Social Worker moving on to different
positions and the case was assigned to
the specific team for Learning
Disability.  Case notes are maintained
on Eclipse, the replacement client
database for Carefirst.  It was noted
that case notes were not always
maintained and up to date. A previous
audit report highlighted the fact that
client records were stored in multiple
locations, including on the Council’s
network drive.  Evidence obtained
during the audit suggests that client
records are still being maintained on
the network drive with historical
records stored in orange client files. A
pilot project in the Mid Argyll area was
undertaken to scan records onto
CIVICA, which would have links from
Carefirst (now Eclipse). 
3 Resources are
allocated in
SRR07
Audit Risk 1
Reasonable A Resource Allocation framework is in
place based on a prioritisation of needs

Page 7

7 
Argyll and Bute Council – Internal Audit Report – Learning and Physical Disability Care Packages
April 2024
accordance with
policies and
procedures and
reviewed on a
regular basis
process.  The prioritisation of all
referrals is based primarily on the
information received at the time of
referral including any relevant
background information held on
CareFirst/Eclipse and is prioritised
according to risk. We were provided
with a Terms of Reference for the
“Adult Care Allocation Group (ACAG)”.
The main objective for the group is to
review and approve total cost
packages for both existing and new
cases over 29 hours per week.
However, we were advised that this
group has been suspended as it was
felt there was no added value to
having a single ACAG as the majority of
Learning Disability care packages were
already over the threshold, and the
wider ACAG members had no expertise
or input in Learning Disability. In
addition, how and where the decisions
on resource allocations are taken and
recorded has not yet been confirmed.
Due to the pressures commissioning,
Learning Disability have requested that
a small number of packages be placed
on the unmet need/waiting list for
Care at Home services where they
require personal care only. This has not
yet been agreed by management and
at present there is no overview of the
total unmet need and available
resources across each of the localities,
we have been advised that services are
working in silos.
4 Roles and
responsibilities have
been documented
and assigned
Audit Risk 2 Substantial Roles and Responsibilities are outlined
in the various policies and procedures.
The “Assessment and Care Planning
procedures” outlines the roles and
responsibilities for each of the staff
categories. 
17. Further details of our conclusions against each control objective can be found in Section 3 of this
report.   
3. Detailed Findings
Care Assessment policies and procedures are in place

Page 8

8 
Argyll and Bute Council – Internal Audit Report – Learning and Physical Disability Care Packages
April 2024
18. Care Assessment policies and procedures are in place with a number of key documents provided
for review, however, these may not refer current practice and make reference to Carefirst (the
Council’s client record management system), which has now been replaced by Eclipse. 
19. Assessment and Care Planning Procedures’ (V1) details that the purpose of the policy,
procedures and practice guidance is to improve outcomes for service users and carers by
providing clear guidance for social work staff about assessment and planning with individuals.
This guidance applies to community services service users and is applicable across all settings. It
states that it should be adopted by all staff. 
20. The Assessment and Care Planning Procedures (V1) covers a broad range of information from
descriptions of terminology, explanations of care management and what it should achieve,
approaches to monitoring and review, team review, service co-ordination.  It documents the
procedures to be followed from the referral stage in the process. It advises what information
should be recorded and how it should be recorded on Carefirst, including how ongoing records
are maintained. An additional policy: Recording & Reflective Practice Policy, Procedures &
Standards was available to review. The aim of this document is to provide clear and concise
information which outlines the approach to recording and reflective practice by the Social Work
service. 
21. A further policy entitled “Funding High Cost Care at Home Packages Procedural Guidance for
Staff and Managers” was available for review.  This is Version 2, dated December 2021. It details
that the eligibility criteria for service is based on the identified needs of the assessment matched
to the prioritisation framework.     
Action Plan 1 
22. Staff have access to relevant policies and procedures, including access to relevant training. All
staff have a session with the Carefirst/Eclipse support team to learn to navigate their way
through the systems. There are guidance notes available on SharePoint and a generic email
address for any requests for support staff may have. The Learning Disability Day Services/
Resource Centres redesign resulted in an action plan being drawn up, this included a training
plan being identified. 
23. We were advised that over the years, the finance team have provided advice and guidance on
the management of budgets for packages, mainly for Team Managers.  From a Social Work
perspective, training on Self Directed Support has been delivered and this is as and when
required. This focuses on outcomes for individuals and how those outcomes are being met. 
24. An induction pack is in the process of being developed and this will include an introduction to
policies and procedures. There is an expectation that trained staff will know the theories behind
assessment, review and legislation, however, the induction process will assist new staff
members to understand the systems and processes within the Council. 
Action Point 2
All cases have been assigned a Case Manager and case reviews are being undertaken in
accordance with policies and procedures

Page 9

9 
Argyll and Bute Council – Internal Audit Report – Learning and Physical Disability Care Packages
April 2024
25. High value care packages generally relate to those who require lifelong support either in a
residential setting or supported within their communities, therefore there is very little change to
their care packages. Both nationally and locally the number of people with learning disabilities
living into older age is increasing, with many presenting with a diverse range of complex and
multiple interrelated health conditions.   Case reviews are undertaken when there is significant
changes to the client’s care needs. Children with Learning Disabilities are provided with a full
care assessment when they move to Adult Services.   
26. We reviewed a 9% sample size of Learning Disability high value care packages, this included
cases within residential settings, placed out with the authority and cases looked after within the
community in Argyll & Bute. Clients are assigned a case manager, although heavy reliance is
placed on the care providers reporting and updating the case manager on a regularly basis.   
Where case managers were not assigned, this was due to the allocated Social Worker moving on
to different positions and the case was assigned to the specific team for Learning Disability
rather than a named case manager.  Care providers are advised to allow regular contact and
updates to be provided. During testing we were advised that some providers will update on a
weekly basis, even if this is just to advise that all is well. 
27. Regular contact is maintained with care providers and where the placement is out with the
authority, 6 monthly reviews are undertaken with the Social Worker travelling to the residential
unit to undertake the review.   
28. Case notes are maintained on Eclipse, the replacement client database for Carefirst.  It was
noted that case notes were not always maintained and up to date. However, reassurance was
provided that this was due to capacity and that although not updated regarding contact notes,
regular contact was maintained with providers.              
Action Plan 3 
29. A previous audit report highlighted the fact that client records were stored in multiple locations,
including on the Council’s network drive.  Evidence obtained during the audit suggests that client
records are still being maintained in multiple locations, including on the network drive with
historical records stored in orange client files. A pilot project in the Mid Argyll area was
undertaken to scan records onto CIVICA (the Council’s document management system), which in
turn would link to CareFirst – now Eclipse. This project was considered to be a success and there
is a strong opinion that it should be rolled out to the rest of the Council areas. A proposal has
been submitted requesting funding in order to roll this project out, firstly across Social Work
Services, then when completed across Health. 
Action Plan 4
Resources are allocated in accordance with policies and procedures and reviewed on a regular
basis 
30. A Resource Allocation framework is in place based on a prioritisation of needs process.  The
prioritisation of all referrals is based primarily on the information received at the time of referral
including any relevant background information held on CareFirst/Eclipse and is prioritised
according to risk.

Page 10

10 
Argyll and Bute Council – Internal Audit Report – Learning and Physical Disability Care Packages
April 2024
31. We were provided with a Terms of Reference for the “Adult Care Allocation Group (ACAG)”. The
main objective for the group is to review and approve total cost packages for both existing and
new cases over 29 hours per week and above for any cases falling into one of the following
categories: 
 Adult Social Care (includes all Self Directed Support options and residential care for
under 65’s)
 NHS Complex Clinical Care – following approval at the Argyll and Bute NHS Complex
Clinical Care Group
 Complex care 
We were advised that this group has been suspended as it was felt there was no added value to
having a single ACAG as the majority of Learning Disability care packages were already over the
threshold, and the wider ACAG members had no expertise or input in Learning Disability.  It was
felt that all the required expertise to make decisions on high cost care packages for Learning
Disability sat with the new CRG, along with the appropriate budget holders. Learning Disability
also have an additional Complex Care Group meeting where care packages are requesting an
element of funding from Health. In addition, how and where the decisions on resource
allocations are taken and recorded has not yet been confirmed.                        
Action Plan 5 
32. The large majority of Learning Disability services are commissioned under the Supported Living
contract and Older People services are commissioned under Care at Home contract. There are a
few anomalies where some providers of Care at Home services are commissioned to provide
support outside of their normal client group (majority in rural areas where it’s difficult to
commission). We were advised that the question regarding prioritisation of personal care in
each locality has been raised several times over the last few months. Due to the pressures on
both sides for commissioning, Learning Disability have requested that a small number of
packages be placed on the unmet need/waiting list for Care at Home services where they
require personal care only. This has not yet been agreed by management. A paper was
submitted to management for comment and response in November but there has been no
feedback as of yet. 
Action Plan 6 
33. Unmet need for Older People Care at Home is collated by the resources team on a weekly basis,
this is then submitted to Performance and Improvement Team, and is reported to Scottish
Government. This data is available on the HSCP SharePoint site. The data for Learning Disability
is not currently recorded formally and not included in the above, increasing the risk that
individuals remain in the community without the required support in place to meet their needs,
particularly around personal care needs. At present there is no overview of the total unmet need
and available resources across each of the localities, we have been advised that services are
working in silos.                                 
Action Plan 7 
34. The Coming Home Implementation Report, published by the Scottish Government, focusses on
improving care for people with complex needs and learning disabilities.  As part of the Coming
Home Implementation work, the Scottish Government is working to improve monitoring of the

Page 11

11 
Argyll and Bute Council – Internal Audit Report – Learning and Physical Disability Care Packages
April 2024
experiences of people with learning disabilities and complex care needs who are in hospital, who
are in out-of-area placements and/or whose current support arrangements are at risk of
breaking down. This is to avoid people living in hospitals or in inappropriate out-of-area
placements that they and their family have not chosen. Through the Coming Home
Implementation Memorandum of Understanding between the Scottish Government and COSLA,
it has been agreed that Integration Authorities will use and operate a local Dynamic Support
Register.  The Dynamic Support Register is designed to improve outcomes. The Register records
information about people with learning disabilities and complex care needs who are in hospital,
in out-of-area placements or whose current support arrangements are at risk of breaking down.
The HSCP reports data quarterly from their Register using a new national reporting process
delivered by Public Health Scotland (PHS). 
Roles and responsibilities have been documented and assigned 
35. Roles and Responsibilities are outlined in the various policies and procedures. The “Assessment
and Care Planning procedures” outlines the roles and responsibilities for each of the staff
categories, including Service Managers/ Area Service Managers/Team Leaders, First Line
Managers, Practitioners and Administration staff.  Financial processes and budget information is
provided in the document with guidance on responsibilities for budgets outlined.

Page 12

Appendix 1 – Action Plan 
No Finding Risk Agreed Action Responsibility / Due Date
Medium
1
Policies and Procedures 
Care Assessment policies and procedures are in place with
a number of key documents provided for review.  The
documents provided refer Carefirst.  With the
implementation of the new client database recording
system – Eclipse these require to reviewed and updated.
Policies and procedures may
not reflect current practice 
Policies and procedures to be
updated as part of the Eclipse
Implementation Program 
Head of Strategic
Planning, Performance
and Technology 
30 June 2024
Medium
2
Induction Pack 
Staff have access to relevant policies and procedures,
including access to relevant training. All staff should have a
session with the Carefirst/eclipse support team to learn to
navigate their way through the systems. An induction pack
is in the process of being developed and this will include
an introduction to policies and procedures.
New staff may not be aware
of how to access policies and
procedures leading to
inconsistencies in practice
 Incorporate Eclipse
Training into the HSCPs
induction program 
 Facilitate training sessions
as part of the Eclipse
Implementation Program
Head of Strategic
Planning, Performance
and Technology 
30 June 2024
Medium
3
Case Notes 
Case notes are maintained on Eclipse, the replacement
client database for Carefirst.  It was noted that case notes
were not always maintained and up to date.  
Records not maintained and
up to date
 Record keeping session(s)
to be delivered by
professional lead 
 Senior Managers to
implement case note
audit within their
respective services – this
should be linked to
individual practitioner
supervision
Senior Managers (Adult
Services) 
30 June 2024

Page 13

13 
Argyll and Bute Council – Internal Audit Report – Learning and Physical Disability Care Packages
April 2024 
No Finding Risk Agreed Action Responsibility / Due Date
Medium
4
Client Records 
A previous audit report highlighted the fact that client
records were stored in multiple locations, including on the
Council’s network drive.  Evidence obtained during the
audit suggests that client records are still being maintained
in several locations. A successful pilot project was run in
Mid Argyll transferring all records onto CIVICA.  A proposal
has been submitted to roll this out across all other areas in
Argyll.
Lack of consistency in the
recording of client records
which may lead to inaccurate
record management or loss of
information 
Ensure that a standardised and
compliant electronic recording
system is implemented across
HSCP services – this should be
achieved via the Eclipse
Implementation Program 
Head of Strategic
Planning, Performance
and Technology   
30 June 2024
Medium
5
Resource Allocation Group 
We were provided with a Terms of Reference for the
“Adult Care Allocation Group (ACAG)”. We were advised
that this group has been suspended as it was felt there
was no added value to having a single ACAG as the
majority of Learning Disability care packages were already
over the threshold, and the wider ACAG members had no
expertise or input in Learning Disability.  In addition, how
and where the decisions on resource allocations are taken
and recorded has not yet been confirmed. 
Inconsistencies in allocation or
resources and a lack of
transparency of resource
allocation decisions 
Develop a Terms of Reference for
the Acute and Complex Care
directorate’s Care Allocation
Group that meets fortnightly and
is chaired by the Head of Service  
Head of Adult Services
(Complex and Critical
Care) 
30 June 2024 
Medium
6
Allocation of Resources 
The large majority of Learning Disability services are
commissioned under the Supported Living contract and
Older People services are commissioned under Care at
Home contract. There are a few anomalies where some
providers of Care at Home services are commissioned to
provide support outside of their normal client group,
however it was found that priority was given to older
peoples services with Learning Disability clients remaining
on a waiting list for personal care services.
Inequity of service provision Review the Care at Home contract
as a matter of priority to ensure
that there is personal care
provision across the authority for
those under the age of 65 with
complex needs, who do not
require more intensive care such
as that provided via Supported
Living.  
Head of Adult Services
(Health & Community
Care)
Chief Finance Officer 
30 June 2024

Page 14

14 
Argyll and Bute Council – Internal Audit Report – Learning and Physical Disability Care Packages
April 2024 
No Finding Risk Agreed Action Responsibility / Due Date
Medium
7
Unmet Need 
Unmet need for Older People Care at Home is collated by
the resources team on a weekly basis, this is then
submitted to Performance and Improvement Team, and is
reported to Scottish Government. The data for Learning
Disability is not currently recorded formally and not
included in the above.  
Clients’ needs may not be met Include the data re unmet need
for those under 65 in the weekly
reporting format already in place
for Older People 
Head of Strategic
Planning, Performance
and Technology 
Head of Adult Services
(Health & Community
Care) 
30 June 2024

Page 15

15 
Argyll and Bute Council – Internal Audit Report – Learning and Physical Disability Care Packages
April 2024
In order to assist management in using our reports a system of grading audit findings has been adopted to allow the significance of findings to be ascertained.  The
definitions of each classification are as follows: 
Grading    Definition
High  A major observation on high level controls and other important internal controls or a significant matter relating to the critical success of the
objectives of the system.  The weakness may therefore give rise to loss or error. 
Medium 
Observations on less significant internal controls and/or improvements to the efficiency and effectiveness of controls which will assist in meeting
the objectives of the system.  The weakness is not necessarily substantial however the risk of error would be significantly reduced if corrective
action was taken.  
Low  Minor recommendations to improve the efficiency and effectiveness of controls or an isolated issue subsequently corrected.  The weakness does
not appear to significantly affect the ability of the system to meet its objectives. 
VFM  An observation which does not highlight an issue relating to internal controls but represents a possible opportunity for the council to achieve
better value for money (VFM).

Page 16

16 
Argyll and Bute Council – Internal Audit Report – Learning and Physical Disability Care Packages
April 2024
Appendix 2 – Audit Opinion 
Level of Assurance  Definition 
High 
Internal control, governance and the management of risk are at a high standard. Only marginal elements of residual risk have
been identified with these either being accepted or dealt with. A sound system of control designed to achieve the system
objectives is in place and being applied consistently. 
Substantial 
Internal control, governance and the management of risk is sound. However, there are minor areas of weakness which put some
system objectives at risk and specific elements of residual risk that are slightly above an acceptable level and need to be
addressed within a reasonable timescale. 
Reasonable 
Internal control, governance and the management of risk are broadly reliable. However, whilst not displaying a general trend,
there are areas of concern which have been identified where elements of residual risk or weakness may put some of the system
objectives at risk. 
Limited 
Internal control, governance and the management of risk are displaying a general trend of unacceptable residual risk above an
acceptable level and placing system objectives are at risk. Weakness must be addressed with a reasonable timescale with
management allocating appropriate resources to the issues raised. 
No Assurance 
Internal control, governance and the management of risk is poor. Significant residual risk and/or significant non-compliance with
basic controls exists leaving the system open to error, loss or abuse. Residual risk must be addressed immediately with
management allocating appropriate resources to the issues.