ARGYLL AND BUTE COUNCIL AUDIT AND SCRUTINY COMMITTEE
FINANCIAL SERVICES 13 JUNE 2024
2023-24 UNAUDITED ANNUAL ACCOUNTS 
1.  EXECUTIVE SUMMARY 
1.1  This covering report gives an overview of the unaudited annual accounts for 2023-
2024 and a summary of the significant movements from 2022-23.   
1.2 The Comprehensive Income and Expenditure statement shows a surplus on the
provision of services of £9.765m, a surplus on the revaluation of Long Term
Assets of £10.097m and an actuarial gain on the pension fund assets/liability of
£123.880m giving an accounting surplus of £143.742m. 
1.3 The Balance Sheet shows that the net worth of the Council has increased by
£143.744m from £667.070m as at 31 March 2023 to £810.814m as at 31 March
2024. The main reason for this increase is an increase in the pension scheme
asset which increased from £139.014m in 2022-23 to £269.216m in 2023-24.
Our pension figures are provided by external actuaries and this increase is due
to investment returns have been greater than expected leading to positive return
on assets.     
1.4 The balance of unusable reserves has increased by £115.818m from £573.295m
as at 31 March 2023 to £689.113m as at 31 March 2024.  The main reasons for
the increase relates to the increase in the pension fund reserve referenced to
above. 
1.5  The balance of usable reserves has increased by £27.926m from £93.775m as
at 31 March 2023 to £121.701m as at 31 March 2024. This is largely due to an
increase to the General Fund of £29.385m due to new earmarked reserves as a
result of the retrospective Service Concessions adjustment in addition to small
increases in the Capital Fund and the Repairs and Renewals Fund.     
1.6  In respect of the General Fund Balance movement, as mentioned above, there
has been an increase of £29.385m from a balance of £86.356m to £115.741m. 
This was due to the Council applying the Service Concessions flexibility during
2023-24 which gave a one-off saving of £36.038m and an annual saving of
£4.821m.  There are substantial sums earmarked within the general fund
amounting to £107.443m to deliver on Council priorities.  The Council has
agreed to hold a contingency balance equivalent to 2% of the Council budget
and this amounts to £6.039m.  The remaining unallocated balance amounts to
£2.259m.   
1.7  The performance against budget for financial year 2023-24 was an overall
underspend of £1.728m (0.55%) after accounting for new earmarking. Social

Page 2

1.8
Work, managed by the Health and Social Care Partnership were overspent by
£0.165m and this amount is covered by their creditor balance, held on the
balance sheet as money owing to the HSCP by the Council, which created a nil
variance on the revenue monitoring position. 
The Committee is asked to consider the Unaudited Annual Accounts for the year
ended 31 March 2024.

Page 3

ARGYLL AND BUTE COUNCIL AUDIT AND SCRUTINY COMMITTEE
FINANCIAL SERVICES 13 JUNE 2024
2023-24 UNAUDITED ANNUAL ACCOUNTS  
2. INTRODUCTION 
2.1  This covering report gives an overview of the unaudited annual accounts for 2023-24 and
a summary of the significant movements from 2022-23. It also gives information on the
revenue outturn for 2023-24 and Council will be asked to approve the Unaudited Annual
Accounts for 2023-24 for issue.   
3. RECOMMENDATIONS 
3.1 The Committee is asked to consider the Unaudited Annual Accounts for the year ended 31
March 2024. 
4. DETAIL 
Introduction 
4.1 The annual accounts set out the financial statements of the Council for the year ended 31
March 2024.  Its main purpose is to demonstrate the stewardship of public funds entrusted
to the Council. The requirements governing the format and content of local authorities’
annual accounts are contained in the Code of Practice on Local Authority Accounting in
the United Kingdom (the Code).  The 2023-24 accounts have been prepared in
accordance with this Code. 
4.2 There is a statutory requirement to prepare a set of accounts and submit them to the
Council and the Controller of Audit.  The date set by the Scottish Government for the
submission of the unaudited annual accounts is 30 June each year.   
4.3 
4.4
It should be noted that the Annual Accounts have still to be audited and therefore figures
are subject to change. Once the audit has been completed the Audit and Scrutiny
Committee will be advised by the external auditor of any material issues coming to light
during the audit and any changes to the Accounts. The timing of this meeting will depend
on when the audit is completed. The Audited Accounts, Audit Certificate and Auditors final
report will then be submitted to the Council. 
Since 2010-11, local authorities have been required to prepare financial statements
following International Financial Reporting Standards (IFRS). Under the Local Authority
Accounts (Scotland) Regulations 2014 there is a requirement to include a management
commentary in the accounts.  The contents of the annual accounts are noted below: 
 Management Commentary
 Statement of Responsibilities for the annual accounts

Page 4

 Annual Governance Statement
 Remuneration Report
 Statement of Comprehensive Income and Expenditure
 Balance Sheet
 Statement of Movement in Reserves
 Cash Flow Statement
 Notes to the Financial Statements
 Council Tax and Non-Domestic Rate Income Accounts
 Group Accounts 
4.5 Management Commentary: this outlines the key messages regarding the objectives and
strategy of the Council and its financial performance for the year. It also looks forward,
outlining the future financial plans for the organisation and the challenges and risks which
are faced by the Council. 
4.6 Statement of Responsibilities for the annual accounts:  this outlines the Council’s
responsibilities and also the responsibilities of the Council’s Section 95 Officer. 
4.7 Annual Governance Statement:  this statement states its view on the adequacy of its
governance and internal control system.  It is the Council’s view that the systems for
governance and internal control are operating effectively within Argyll and Bute Council
during 2023-24 and that there are no significant weaknesses. 
4.8 Remuneration Report:  this report provides details of the remuneration policy,
remuneration and pension benefits of senior councillors and senior officers in addition to
detail on employee exit packages.   
4.9
Comprehensive Income and Expenditure Statement (CIES):   
This statement shows the accounting cost of providing services rather than the amount to
be funded from taxation. The Council is required to make various statutory accounting
adjustments to the net cost of services as reported in the budgetary outturn in order to
comply with The Code.  These accounting adjustments include depreciation, loans fund
principal repayment and accrued holiday leave not taken by 31 March 2024. 
4.10 
4.11
The Council ended the year with a surplus of £143.742m for 2023-24. This is the
accounting surplus based on the IFRS compliant accounts rather than the movement in
the General Fund Balance. The total Comprehensive Income and Expenditure comprises
of a surplus on the provision of services of £9.765m, increased by a surplus on the
revaluation of Long Term Assets of £10.097m and an actuarial gain on the pension fund
assets/liability of £123.880m. 
In 2023-24 the Council adopted the financial flexibility introduced by the Scottish
Government relating to two service concession contracts for NPDO and DBFM schools
which allowed the debt element of the service concession arrangements to be accounted
for over the life of the asset as opposed to the life of the contract. This resulted in a one-off
retrospective gain of £36.038m and gain in 2023-24 of £4.831m. 
4.12 The surplus on the provision of services of £9.765m compares to a deficit of  £6.047m for
2022-23. The main factors contributing to this change is a decrease in the Net Cost of

Page 5

Services of £1.936m, an increase in other operating income and expenditure of £0.202m,
a decrease in financing and investment income and expenditure of £5.027m and an
increase in the overall funding of £9.051m. 
4.13   £000 £000
Surplus/(Deficit) on Provision of Services   9,765
Remove statutory adjustments that don't feature in budget outturn:    
Depreciation 25,732  
Impairment of Assets charged to services (2,576)  
Capital Funding (23,550)  
CFCR (1,616)  
Pension Adjustment (6,322)  
Statutory Repayment of Debt (7,696)  
Repayment of Finance Leases (5,280)  
Transfers to/from Other Statutory Reserves (77)  
Service Concessions 40,869 
Other Adjustments 136      
19,620
Movement In General Fund Balance   29,385
Adjust for earmarkings:    
Released sums earmarked to service budgets 2023-24 27,286  
Supplementary estimates agreed during 2023-24 9  
Revenue Budget 23-24 - transferred to general fund (19)  
Contributions to earmarked reserves 2023-24 (54,933)      
(27,657)
Revenue Budget Underspend/(Overspend)   1,728 
4.14 Balance Sheet: The Balance Sheet shows that the net worth of the Council has increased
by £143.744m from £667.070m as at 31 March 2023 to £810.814m as at 31 March 2024.
The major changes are set out in the table below. 
31/03/2023
£000
31/03/2024
£000
Change
£000
Main Reason
Long
Term
Assets
886,601 1,038,702 152,101 Largely due to an increase in pension
debtor due to a higher than expected
investment return plus revaluation of
fixed assets.
Current
Assets
90,693 58,539 (32,154) Reduction in cash balances in
comparison to previous year due to
the early repayment of long term
loans and funding the capital
programme through cash balances
as opposed to taking out new long
term borrowing.
Current
Liabilities
(68,592) (73,853) (4,461) Small increases in short term
creditors and short term borrowing.

Page 6

Long
Term
Liabilities
(241,632) (213,574) 28,058 Reduction in long term borrowing due
to the early repayment of loans
during the year.
Total 667,070 810,814 143,744 
4.15
Statement of Movement in Reserves: 
This shows the movement on the different reserves held by the Council, analysed into
usable reserves (resource backed reserves which can be used to fund expenditure) and
unusable reserves (required purely for accounting purposes and are not backed by
resources). 
4.16 The total Council reserves have increased from £667.070m at 31 March 2023 to
£810.814m at 31 March 2024, an increase of £143.744m. 
4.17 The balance of unusable reserves has increased by £115.818m from £573.295m as at 31
March 2023 to £689.113m as at 31 March 2024. The main reason for this is an increase in
the pension scheme asset which increased from £139.014m in 2022-23 to £269.216m in
2023-24 and an increase in the revaluation reserve of £5.709m which arises from
revaluations of properties. 
4.18 In respect of the General Fund Balance movement, there has been an increase of
£29.385m from a balance of £86.356m to £115.741m and the detail on the movement in
the balance is summarised within the table below. There is a decrease in respect of
earmarked reserves utilised during the year of £27.286m which are offset by new
earmarkings at the end of 2022-23 of £54.933m. 
4.19 The General Fund balance at 31 March 2024 is £115.741m. The total earmarked balances
amount to £107.443m. The Council has agreed to hold a contingency balance equivalent
to 2% of the Council budget and this amounts to £6.039m. The remaining General Fund
balance (“unallocated balance”) amounts to £2.259m. 
£000
Balance on General Fund 31 March 2023 86.356
Revenue Budget 2023-24 – transfer to General Fund 19
Supplementary Estimates agreed during 2023-24 (9)
Released sums earmarked to service budgets 2023-24 (27,286)
Contributions to earmarked reserves 2023-24 – Service Concessions 35,658
Contributions to earmarked reserves 2023-24 - Other 19,275
Overall budget underspend as noted above 1,728
Balance on General Fund 31 March 2024 115,741

Page 7

4.20 Cash Flow Statement:  The Cash Flow Statement shows the changes in cash and cash
equivalents of the Council during the financial year. This is analysed into Operating,
Investing and Financing Activities. The Cash and Cash Equivalents decreased by
£10.814m to -£9.991m. 
4.21 Notes to the Financial Statement:  The notes section provides further information and
explanation on some of key figures included within the Accounts. The notes conform to the
guidance issued by CIPFA/LASAAC within the Code of Practice on Local Authority
Accounting. 
4.22 Council Tax Income Account:  This account shows the gross income raised from council
tax levied and deductions made under the Local Government Finance Act 1992.  The
resultant net income is transferred to the CIES.  Council Tax rate for Band D was
£1,479.20 for 2023-24 which represented a 5% increase from 2022-23 as agreed by
Council as part of the budget setting process.  The income transferred to the general fund
for Council Tax in 2023-24 was £61.909m.  This compared to £53.900m in 2022-23.   
4.23 Non Domestic Rate Income Account:  This account is an agent’s statement that reflects
the statutory obligation for billing authorities to maintain a separate Non-Domestic Rate
Account.  Non Domestic Rate Income amounted to a share of £37.645m for 2023-24
allocated from the national pool.  This compares to £33.179m in 2022-23.  Our own net
income amounted to £44.332m and we made a contribution to the national pool of
£6.687m for 2023-24.  These figures compared to income of £34.534m and a contribution
to the national pool of £1.355m for 2022-23. 
4.24 Group Accounts:  Argyll and Bute Council Group comprise the following entities: 
 Argyll and Bute Council
 Dunbartonshire and Argyll and Bute Valuation Joint Board
 Live Argyll (Leisure Trust). 
In addition, the council’s Common Good Funds have been fully consolidated into the Group
Accounts. 
4.25 The effect of inclusion of the Associates, Subsidiary and Common Good Funds on the
Group Balance Sheet is not yet known as the Group Accounts have still to be completed as
we are awaiting draft accounts from Live Argyll and the Joint Valuation Board. These will be
finalised prior to the accounts going to full Council on 27th June 2024. 
5. CONCLUSION 
5.1 The Unaudited Annual Accounts have been prepared in accordance with professional and
statutory requirements. Overall the financial position of the Council remains stable. 
6. IMPLICATIONS 
6.1 Policy – None.
6.2 Financial -  None, summarises the financial position for 2023-24
6.3 Legal -  None.
6.4 HR -  None.

Page 8

6.5 Fairer Scotland Duty -  None.
6.5.1 Equalities -  None
6.5.2 Socio-Economic -  None
6.5.3 Islands Duty -  None
6.6
6.7
Climate Change -
Risk - 
None.
None.
6.8 Customer Service -  None. 
6.9 The Rights of the child (UNCRC) None 
Kirsty Flanagan
Executive Director/Section 95 Officer
13 June 2024 
Councillor Ross Moreland, Policy Lead for Finance and Commercial Services 
Appendix 1 – Unaudited Annual Accounts 2023-24 
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk

Page 9

Argyll and Bute Council 
Comhairle Earra Ghàidheal agus Bhòid 
Unaudited Annual Accounts
For the year ended 31 March 2024

Page 10

FRONT COVER PICTURE: HELENSBURGH WATERFRONT DEVELOPMENT

Page 11

LANGUAGE OPTIONS 
If you would like this document in another language or format, or if you require the
services of an interpreter, please contact us. 
Financial Services
Argyll and Bute Council
Kilmory
Lochgilphead
Argyll
PA31 8RT 
Tel: 01546 605522

Page 12

ANNUAL ACCOUNTS CONTENTS 
www.argyll-bute.gov.uk   ________________________________________________    Page 1 
Page
Management Commentary 4-23
Statement of Responsibilities for the Annual Accounts 24
Annual Governance Statement 25-38
The Remuneration Report 39-48 
Statement of Comprehensive Income and Expenditure 49-50
Balance Sheet 51-52
Statement of Movement in Reserves – Movement in 2023-24 53-54
Statement of Movement in Reserves – Comparative Movement in 2022-23 55-56
Cash Flow Statement 57
Notes to the Financial Statements (See Page 2-3) 58-123
Council Tax Income Account 124
Notes to the Council Tax Income Account 125
Non Domestic Rate Income Account 126
Notes to the Non Domestic Rate Income Account 127
Group Accounts - Introduction 128
Group Statement of Comprehensive Income and Expenditure 129
Group Balance Sheet 130-131
Group Statement of Movement in Reserves – Movement in 2023-24 132
Group Statement of Movement in Reserves – Comparative Movement 2022-23
Group Cash Flow Statement
133
134
Notes to the Group Financial Statements    135-139
Glossary of Terms
Appendix A: Trade Union Facility Time Statement 2023-24 
140-141
142-143

Page 13

Notes to the Financial Statements Contents 
www.argyll-bute.gov.uk   ________________________________________________    Page 2 
P
Note No Page
1 Summary of Significant Accounting Policies 58-71
2 Accounting Standards Issued But Not Yet Adopted 71
3 Critical Judgements in Applying Accounting Policies 71-72
4 Assumptions Made About the Future and Other Major Sources of
Estimation Uncertainty
72-74
5 Expenditure and Funding Analysis 75-78 
6 General Fund Reserves 79-80
7 Supplementary Notes to the Statement of Comprehensive Income
and Expenditure
81-82
8 Other Operating Income and Expenditure 82
9 Agency Services 82-83
10 Community Care and Health (Scotland) Act 2002 83
11 Fees Payable to External Auditors 84
12 Waste Management Public Private Partnership 84
13 Grant Income 85
14 Related Parties 86-87
15 Property, Plant and Equipment 88-93
16 Heritage Assets 93
17 Intangible Assets 94-95
18 Investment Property 95-96
19 Schools Built under Public Private Partnership Contracts (PPP)               96-99
20 Operating Leases 99-100
21 Finance Leases 100-101
22 Long Term Debtors 102
23 Debtors 102
24 Assets Held for Sale 103
25 Cash and Cash Equivalents 103
26 Creditors 104
27 Financial Instruments Disclosures 104-107
28 Other Liabilities 108

Page 14

Notes to the Financial Statements Contents 
www.argyll-bute.gov.uk   _______________________________________________ Page 3 
P
Note No Page
29 Provisions                                                                                              108-109
30 Capital Grants Received in Advance                                                            109
31 Defined Benefit Pension Schemes 110-116
32 Unusable Reserves 117-118
33 Usable Reserves                                                                                           118
34 Contingent Liabilities 119
35 Termination Benefits 119-120
36 Trust Funds and Other Third Party Funds 120
37 Common Good Funds 120-121
38 Tax Incremental Financing (TIF) Projects 121
39 Cash Flow Statement – Operating Activities 122
40 Cash Flow Statement – Investing Activities 122
41 Cash Flow Statement – Financing Activities 123

Page 15

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 4 
1.   INTRODUCTION
Welcome to the financial statements for Argyll and Bute Council and its group for the year ended 31 March
2024.  The statements have been compiled in accordance with the Code of Practice on Local Authority
Accounting in the United Kingdom (the Code).  This commentary outlines the key messages regarding the
performance of the Council over the 2023-24 financial year as well as providing an indication of risks and
issues which may impact upon the Council in the future.  
2. PROFILE OF ARGYLL AND BUTE COUNCIL  
The report starts with outlining some key facts about Argyll and Bute.

Page 16

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 5 
3. VISION AND PRIORITIES
The Council has a new 5 year Corporate Plan for the period 2023-2027 and also an Annual Business
Plan. This new document replaces the former annual Service Plans to bring more focus and scrutiny on
the delivery and performance of the organisation against its priorities. This delivers on the
recommendation in our Best Value Audit to make the link between priorities and performance clearer.  
The Council’s vision is: 
We have a vision for a successful, vibrant Argyll and Bute with a growing population and a thriving
economy. A place where people want to come to live, to work and to do business as a result of action to
combat and reverse decline. We see the potential for thriving local economies that support our rich mix

Page 17

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 6 
of remote, rural and island communities. Communities which also benefit from services that work –
where we make the best use of all of our resources so that our core business as a council is as effective
as possible. 
We want Argyll and Bute’s communities to be on a level playing field with others around the country –
that is why we will campaign for equity for our communities on issues like fair funding, coping with
challenges like the cost of living, and securing digital access and physical access to other opportunities.
We will do our utmost to ensure that local voices and needs are taken into account in national decision-
making. 
We recognise that the cost of living crisis will affect countless households in Argyll and Bute. We want to
play a part in responding to that and mitigating the impact on our communities’ overall wellbeing and
future success. 
We see our council and our communities working together in playing our part and making our
contributions to wider priorities like climate change, economic growth, strong local governance and more
– using our strong track record in partnership working, at all levels, to secure the best possible
outcomes. 
Our Priorities for the Council Term 2022 to 2027 are shaped around delivering this vision for Argyll and
Bute, our people, our success and our future. 
At the Council meeting on 25 April 2024 there was a change in political management arrangements and
therefore a new Corporate Plan for the period 2024-2028 will be prepared and presented to Council with
updated priorities during 2024-25.  Details on activity, for each financial year, against the Council
priorities will be set out in a new Council Annual Business Plan which will also be presented to Council
at the same time.   
The Argyll and Bute Community Planning Partnership (CPP) brings together local public services with
communities they service, and provides a focus for partnership working that targets specific local
circumstances. Partners work together to improve local services and to ensure that they meet the needs
of local people, especially those who need the services most.  The Argyll and Bute Outcome
Improvement Plan has been in place for the last 10 years and had six key outcomes.  
• Our economy is diverse and thriving
• We have an infrastructure that supports sustainable growth
• Education skills and training maximise opportunities for al
• Children and young people have the best possible start
• People live active, healthier and independent lives
• People will live in safe and stronger communities, 
The Argyll and Bute CPP has completed its community engagement on identifying the priorities for the
next 10 years (2024 – 2034) and these are:
1. Transport Infrastructure,
2. Housing,
3. Community Wellbeing. 
Argyll and Bute Council will continue to be a leading partner in the partnership and ensure that the
priorities of the CPP and the Council are aligned. 
Some of our achievements, and the challenges we faced, in relation to the Council’s agreed
Corporate Outcomes are highlighted below. (Note that this section is incomplete and further detail
will be added prior to Council meeting on 27 June)

Page 18

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 7 
We have an infrastructure that supports sustainable growth
Developing infrastructure for drones
In 2023, the Council won the COSLA Excellence Award for innovation due to its work developing
infrastructure and service change by using drones.  The Council worked with Skyports (an
international drone company) to develop a deliverable school meal delivery system using drone
technology. This culminated in a successful pilot flight, which delivered school meals from Oban
Airport to Lochnell Primary School, enabling proof of concept to be delivered. Argyll and Butes island
and remote schools can often struggle to recruit catering staff and travel times to supply perishable
goods can be long using roads and ferries.  Drone’s potentially offer a low carbon and quicker
alternative to traditional transport. 
Planning permission has now been granted to
establish a permanent Oban Drone Facility to
enable commercial deliveries in the area, with
schools meals continuing to be a pilot test subject.
Funding has now been secured to establish this
and the project is a component part of development
of a new business park at Oban Airport funded by
Tax Incremental Financing (TIF) and Rural Growth
Deal (RGD).  This will be the first permanent Drone
Facility in the UK. This ensures that it is a
sustainable delivery mechanism for the school
meals and other service in the future. The Council
has also been awarded £250K from the Regulator’s
Pioneer Fund for the development of the UAV
logistics hub, based at Oban Airport, to serve the
islands, building on the pilot approach. 
Weather Incident 
During October 2023 Argyll and Bute suffered extensive storm damage and a major incident was
declared within the Council area. The flooding resulted in substantial damage to bridges and a number
of landslides which disrupted the roads network and cut off some areas altogether. Transport
connections in and out of Argyll and Bute were severely compromised and for a period of time all of
the trunk roads and many of the local roads were impassible. A number of helicopter evacuations took
place and reception centres were set up in the immediate aftermath.
This incident was unprecedented and every effort was made to re-open roads when safe to do so
however some routes required more considerable remedial action. Works carried out were extensive
with dozens of locations requiring attention from simple cleansing of a small drain to significant
landslides requiring temporary roads to be created and full bridge replacements. Furthermore, to
ensure all children in the impacted areas were able to attend school transport via boat was arranged.

Page 19

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 8 
Road Safety Improvements
During 2023-24 the Councils Network and Standards team secured £0.270m of funding from the
National Road Safety Improvement Fund. This has allowed a number of safety improvements to our
roads and footways including:
• Village gateways at Clynder, Kilcreggan, Rosneath and Garelochhead including coloured
surfacing at access points and speed roundels.
• Two new sections of footway at School Street, Bowmore with improved drainage, road
markings and street lighting.
• Carriageway widening and footway construction at Millpark Road, Oban including
improvements to drainage, road markings and street lighting.
• Provision of new footway in Taynuilt resulting in a safe route for school children to utilise.

Page 20

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 9 
4. FINANCIAL PERFORMANCE 2023-24 
The Council has a robust financial reporting
framework in place and a comprehensive monitoring
pack is prepared and presented to every Policy and
Resources Committee.  This includes reports on the
revenue budget, capital plan, financial risks, treasury
monitoring, reserves and balances and delivery of
any previously agreed savings.  The financial
framework is shown on the left. 
Revenue:  Outturn against Budget
The performance against budget for financial year 2023-24, after adjusting for automatic and proposed
earmarked reserve proposals, was an overall underspend of £1.728m, 0.55% as summarised in the table
below.  (The corresponding position for 2022-23 was an underspend of £3.326m, 1.07%.) 
2023-24 Final Revenue Budget Outturn 
Actuals
Budget Variance
Percentage Adjusted for
Automatic
Earmarkings
(Overspend)
Underspend  
£000 £000 £000 %
Chief Executive's Unit 1,155 1,161 6 0.53%
Executive Director (Douglas Hendry) 139,308 139,999 691 0.49%
Executive Director (Kirsty Flanagan) 58,610 57,258 (1,352) (2.36%)
Weather related incident costs (not
covered by Bellwin Scheme) 839 0 (839) 0.0%
Joint Boards 1,319 1,396 77 5.56%
Other 11,584 11,584 0 0.0%
Service Concessions (40,869) (40,489) 380 (0.94%)
Social Work 77,605 77,605 0 0.0%
Net Expenditure 249,551 248,514 (1,037) (0.42%)
Total Funding 314,827 314,794 33 0.01%
OVERSPEND PRIOR TO LOANS
FUND    (1,004)  (0.32%)
Loans Fund 8,615 14,547 5,932 40.78%
UNDERSPEND BEFORE
EARMARKINGS   4,928 1.57%
Proposed Unspent Budget Earmarking
Proposals   (3,200) 
UNDERSPEND AFTER PROPOSED
EARMARKINGS   1,728 0.55%

Page 21

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 10 
Within the Chief Executive’s Unit (Community Planning) there was a small underspend resulting within
travel codes due to staff travel costs coming in under budget due to increased digital working and less face
to face meetings. 
Within the remit of Executive Director Douglas Hendry (Education, Legal and Regulatory Services and
Commercial Services), there was an overall underspend due to: 
• Receipt of one-off historic water rate refunds.
• Staffing underspends due to delays in recruitment and staffing underspends within Cleaning,
Early Learning and Childcare and Legal and Regulatory Support.
• Underspends within the Scheme of Devolved School Management where previous carry forwards
were not fully utilised. 
Within the remit of Executive Director Kirsty Flanagan (Roads and Infrastructure, Development and
Economic Growth, Customer Support Services and Financial Services) there was an overall overspend
due to: 
• Reduction in income within Piers and Harbours
• Additional fleet costs across the service
• Increased staff costs for Pupil Transport
• An unrealised Depot saving
• Increased electricity costs for street lighting
• Additional Car Parking maintenance costs
• Reduction in TRO income in Roads. 
There were also costs relating to a significant weather incident that occurred during 2023-24 that could
not be claimed through the Scottish Government’s Bellwin scheme which resulted in an overspend. 
Social Work, managed by the Health and Social Care Partnership, reported an overspend of £0.165m as
a result of ongoing demand for older people care services, both residential and non-residential. Per
CIPFA/LASAAC Guidance in prior years an earmarking relating to the HSCP was recognised as a
creditor on the Council’s balance sheet making the funds available to Social Work to spend in future
years, therefore this over spend has been drawn down from the creditor balance. 
There is a favourable year-end position in relation to Council Tax of which was due to Council Tax debt
recovery after court summons being higher than anticipated. 
There was an underspend within the Loans Fund due to a number of reasons but largely as a result of
effective Treasury Management which saw increased levels of interest received on investments
combined with reduced borrowing costs which resulted in an improved position in excess of £3m
compared to previous year. Significant slippage in the capital programme in 2022-23 resulted in lower
principal repayments in 2023-24 than anticipated and there was also a one-off gain of £0.870m as a
result of a discount received on the early repayment of loans.   
In 2023-24 the Council adopted the financial flexibility introduced by the Scottish Government relating to
two service concession contracts for NPDO and DBFM schools which allowed the associated borrowing
to be accounted for over the life of the asset as opposed to the life of the contract (see note 6.1 for
further detail). This resulted in a one-off retrospective gain of £36.038m and gain in 2023-24 of £4.831m.
As part of the 2024-25 budget setting process Council agreed to transfer £0.380m from the Service
Concessions gain to the General Fund hence there is an underspend in 2023-24 relating to this that will
increase the General Fund.

Page 22

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 11 
The overall favourable position for Departmental and Central Expenditure Budgets due to the
underspend within the Loans Fund has provided the opportunity to earmark unspent budget for specific
purposes aligned to the objectives, priorities and targets of the Council. 
Delivery of 2023-24 Agreed Savings
The Council has been required to make significant
budget savings for a number of years in order to
ensure it responds to continued funding reductions,
rising cost pressures and complies with its
statutory requirement to set a balanced budget
whilst meeting the needs of local residents.   
Budget savings of £9.348m (20 saving options)
were agreed for 2023-24. These, and savings
agreed in previous years which had to be delivered
in 2023-24 totalling £0.031m (3 saving options),
were monitored throughout the year.  The chart on
the right shows the overall delivery of savings and
any shortfall was absorbed within departmental
resources as is evidenced from the overall
departmental underspends. Some of these saving
options were non- recurring in nature (£2.581m). 
Capital:  Outturn against Budget 
The net 2023-24 capital expenditure was £37.860m compared to an annual budget of £33.166m,
(adjusted during the year for previously agreed slippages, accelerations and virements) giving rise to a
year end overspend of £4.694m (14.15%).  There are a number of under and (overspends) within the
outturn position, the most significant are noted below:

Page 23

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 12 
Project (Over)/Under
Spend (£m)
Explanation
Roads
Reconstruction
0.507 Funding received late in 2023-24 so carried forward into 2024-25 when
spend will be incurred.
Oban High School
Replacement
0.406 Ongoing negotiations with contractor have delayed final payments and
retention invoices which are outstanding.
Shared Offices 0.372 Delays in expenditure as only minor works have been carried out to
offices during 2023-24 due to office rationalisation project.
Town Centre Funds (0.350) External funding will not be received until works are complete. Overall
the project is within budget.
Harbour Investment
Programme
(0.408) Reversal of previous slippage - consultancy work at Fionnphort and Port
Askaig concluded earlier than previously anticipated. Overall the project
is within budget.
Kilmory Business
Park
(0.432) Delays in invoicing due to legal requirements resulting in delays in
receiving external funding. Overall the project is within budget.
Environmental
Projects Income
(0.500) External funding will not be received until works are complete which
creates an in year variance. Overall the project is within budget.
CHORD – Rothesay
Income
(1.435) External funding will not be received until works are complete which
creates an in year variance. Overall the project is within budget.
Dunoon STEM Hub
Income
(2.050) Project has been delayed due ongoing discussions regarding the location
of the STEM Hub and budgeted income will not be received until the
project is complete. Overall the project is within budget.
Helensburgh
Waterfront Income
(2.369) Timing of receipt of funding causing 2023-24 variance which will be
received in 2024-25. Overall the project is within budget. 
After accounting for previously agreed slippages, the total slippage in the capital programme in 2023-24
was £23.143m.  In 2023-24 capital expenditure across Scotland’s councils continues to be impacted by
increased inflation rates and shortages in construction materials, affecting both cost and delivery
plans.  There are also elements of slippage that can be attributed to incorrect profiling of spend at the
start of the financial year as opposed to delays in the programme. 
There are 169 projects within the Capital Plan:  143 of the projects are complete or on track and 26 are
off track but recoverable as a result of the slippage mentioned previously within the capital programme.
There are no projects off track that are not recoverable. 
Health and Social Care Partnership (HSCP)
The Argyll and Bute Integration Joint Board (IJB) with responsibility for Social Work and a range of health
services was established and came into effect on 1 April 2016.  The Council approved the 2023-24
budget on 23 February 2023 and the amount approved for Social Work services transferring to the
Integration Joint Board for 2023-24 was £76.253m.  The budget figures quoted in the previous outturn
table include in-year adjustments.
In terms of the outturn position, the HSCP has reported an underspend for 2023-24 of £2.889m and
there is no debt outstanding to the Council. The Council has a creditor totalling £3.389m on its balance
sheet in relation to earmarked reserves which the Council holds on behalf of the HSCP. The earmarked
balance comprises £0.791m of Scottish Government funding for a range of specific Scottish Government
Initiatives, £0.630m of general reserves and £1.968m for service transformation and infrastructure
investment.

Page 24

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 13 
5. FINANCIAL STATEMENTS
Expenditure and Funding Analysis Statement
The Expenditure and Funding Analysis Statement shows how the Council funding is spent across
services.  It also compares to the expenditure shown in the Statement of Comprehensive Income and
Expenditure and details the differences between the two.  The differences are a result of accounting
statutory adjustments that are required within the Statement of Comprehensive Income and Expenditure,
for example, depreciation, pension adjustments etc. 
Comprehensive Income and Expenditure Statement (CIES)
The CIES shows the accounting cost of providing services rather than the amount to be funded from
taxation. Councils raise taxation to cover expenditure in accordance with regulations; this may be
different from the accounting cost. The taxation position is shown in the Movement in Reserves
Statement.
The Council is required to make various statutory accounting adjustments to the net cost of services as
reported in the budgetary outturn in order to comply with the Code of Practice for Local Authority
Accounting in the United Kingdom 2023-24.  These accounting adjustments include depreciation, loans
fund principal repayment and accrued holiday leave not taken by 31 March 2024.  Internal income also
requires to be removed between segments within the CIES.   
Reconciliation of CIES to Revenue Budget Outturn
A reconciliation of the Surplus on the Provision of Services of £9.765m as noted in the CIES to the
revenue budget outturn of £1.728m underspend is shown below.   
Reconciliation of CIES to Revenue Budget Outturn 
£000 £000
Surplus/(Deficit) on Provision of Services   9,765
Remove statutory adjustments that don't feature in budget outturn:    
Depreciation 25,732  
Impairment of Assets charged to services (2,576)  
Capital Funding (23,550)  
CFCR (1,616)  
Pension Adjustment (6,322)  
Statutory Repayment of Debt (7,696)  
Repayment of Finance Leases (5,280)  
Transfers to/from Other Statutory Reserves (77)  
Service Concessions 40,869 
Other Adjustments 136      
19,620
Movement In General Fund Balance   29,385
Adjust for earmarkings:    
Released sums earmarked to service budgets 2023-24 27,286  
Supplementary estimates agreed during 2023-24 9 
Revenue Budget 23-24 – transferred to General Fund (19)  
Contributions to earmarked reserves 2023-24 (54,933)      
(27,657)
Revenue Budget Underspend/(Overspend)   1,728

Page 25

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 14 
Balance Sheet
The Balance Sheet summarises the Council’s assets and liabilities as at 31 March 2024 and explanatory
notes are provided.   The net worth of the Council has increased by £143.744m from £667.070m as at 31
March 2023 to £810.813m as at 31 March 2024.   The major changes are set out in the table below. 
Main Balance Sheet Changes 
31/03/2023
£000
31/03/2024
£000
Change
£000
Main Reason
Long Term
Assets
886,601 1,038,702 152,101 Largely due to an increase in pension debtor due to
a higher than expected investment return plus
revaluation of fixed assets.
Current
Assets
90,693 58,539 (32,154) Reduction in cash balances in comparison to
previous year due to the early repayment of long
term loans and funding the capital programme
through cash balances as opposed to taking out
new long term borrowing.
Current
Liabilities
(68,592) (72,853) (4,261) Small increases in short term creditors and short
term borrowing.
Long Term
Liabilities
(241,632) (213,574) 28,058 Reduction in long term borrowing due to the early
repayment of loans during the year.
Total 667,070 810,814 143,744 
Provisions  
The Council has provisions totalling £4.520m on the Balance Sheet as detailed in Note 29 to the
Accounts.  The larger provisions, those £0.250m or over, are summarised below.
• £2.740m for landfill sites.  A provision for landfill sites was created in 2014-15 reflecting the Council’s
liability for restoration and ongoing maintenance in respect of landfill sites operated by the Council at
Glengorm, Gartbreck and Gott Bay.  These have been provided for based on the net present value of
estimated future costs. 
• £1.025m for NPDO and Hub DBFM Payments.  This provision is held in relation to disputed
performance deductions and unbilled utility costs.   
Pension Asset
The Council is required to account for its share of the Strathclyde Pension Fund assets and liabilities. 
The information included in the Accounts is provided by the Pension Fund actuaries following the annual
valuation of the Fund.  
The Council’s share of the assets of the Strathclyde Pension Fund have been assessed on an actuarial
basis using the projected unit method, an estimate of the pensions that will be payable in future years
dependent on the assumptions about mortality rates, salary levels etc.  The asset relates to benefits
earned by existing or previous employees up to 31 March 2024. 
There has been an increase in the pension valuation asset from £139.014m in 2022-23 to £269.216m in
2023-24. This is as a result of higher than expected investment return on the pension asset.
The pension liability or asset can fluctuate significantly year on year.  The table below shows the pension
liability or asset over the last three years. Further detail on the pension estimates are included within
Note 31.

Page 26

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 15 
Pension (Liability)/Asset at the end of the financial year 
2021-22
£000
2022-23
£000
2023-24
£000
Pension (Liability)/Asset 4,634 139,014 269,216 
Borrowing  
During 2022-23 the Council’s external borrowing reduced by £23.037m from £143.973m as at 31 March
2023 to £120.936m as at 31 March 2024.  The reduction was due to the early repayment of long term
loans during the year in order to receive a discount and achieve an overall treasury gain.  
The Council was under borrowed by £68m at 31 March 2024.  This was due to the early repayment of
loans, minimal new long term borrowing taken out and slippage within the capital programme. 
The Council’s 2023-24 ‘Treasury Management Strategy and Annual Investment Strategy’ was approved
at the full Council meeting on 23 February 2023 and outlines the Council’s capital prudential and treasury
indicators. 
Statement of Movement in Reserves
This Statement shows the movement on the different reserves held by the Council, analysed into usable
reserves (resource backed reserves which can be used to fund expenditure) and unusable reserves
(required purely for accounting purposes and are not backed by resources).
The balance of unusable reserves has increased by £115.818m from £573.295m as at 31 March 2023 to
£689.113m as at 31 March 2024.  The main reason for this movement is the increase in the pensions
reserve noted earlier in this commentary plus smaller accounting adjustments required through the
Capital adjustment account and revaluation reserve.
The balance of usable reserves has increased by £27.926m from £93.775m as at 31 March 2023 to
£121.701m as at 31 March 2024.  This is due to an increase in the General Fund of £29.385m offset by
smaller reductions in the Capital Fund outlined in Note 34.1 and the Repairs and Renewals Fund
outlined in Note 34.2.   
In respect of the General Fund Balance movement, there has been an increase of £29.385m from a
balance of £86.356m to £115.741m and the detail on the movement in the balance is summarised within
the table below.   
Movement on General Fund Balance  
£000
Balance on General Fund 31 March 2023 86,356
Revenue Budget 2023-24 – transfer to General Fund 19
Released sums earmarked to service budgets 2023-24 (27,286)
Contributions to earmarked reserves 2023-24 – Service Concessions 35,658
Contributions to earmarked reserves 2023-24 - Other 19,275
Supplementary Estimate (8)
Overall budget underspend as noted above 1,728
Rounding (1)
Balance on General Fund 31 March 2024 115,741

Page 27

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 16 
General Fund Balance
The chart below shows what is included within the General Balance as at 31 March 2024 with a comparison
to the position as at 31 March 2023. 
General Fund Balances as at 31 March 2023 and 31 March 2024 
An analysis of the earmarked balances are shown in the chart below. 
Earmarked Balances held in the General Fund as at 31 March 2024 
Group Accounts (SOME INFORMATION NOT YET AVAILBLE UNTIL RECEIPT OF LIVE
ARGYLL/VJB ACCOUNTS ALLOWS US TO COMPLETE THE GROUP ACCOUNTS)
The Group accounts include Dunbartonshire and Argyll & Bute Valuation Joint Board as an Associate, as
the Council have “significant influence” over their financial and operating policies.  Live Argyll is a wholly
owned subsidiary of Argyll and Bute Council and is consolidated within the group accounts on a line by
line basis.

Page 28

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 17 
In addition, the Council’s Common Good Funds have been fully consolidated into the Group Accounts
and Note 37 gives further details on the Council’s Common Good Funds. 
The effect of inclusion of the Associates, Subsidiary and Common Good Funds on the Group Balance
Sheet is to increase both reserves and net worth by £XXXm.   This gives an overall net asset position for
the Group of £XXXm, an increase of £XXXm from the previous year.  The most significant increase is in
the pension position of £XXXm in addition to an increase in non-current assets as a result of
revaluations. 
The Argyll and Bute Integration Joint Board has responsibility for all health and social care functions
relating to adults and children and will oversee the strategic planning and budgeting of these, together
with corresponding service delivery for the residents of Argyll and Bute.  Argyll and Bute Council
contributed £77.605m towards the Argyll and Bute Integration Joint Board in the 2023-24 financial year.
All transactions are accounted for and shown within the single entity statements and the IJB are treated
as a Joint Venture within the Group Accounts therefore a share of their overall surplus and net assets
have been recognised in the Group Statements. 
6. KEY FINANCIAL INDICATORS
The financial indicators outlined below have been developed to assist the reader in assessing the
performance by the Council over the last financial year and the affordability of its ongoing commitments.
Key Financial Indicators
Financial Indicator 2022-23 2023-24 Comment
Unallocated General
Fund Balance as a
proportion of next
year’s Annual
Budgeted Net
Expenditure
2.44% 2.75% Reflects the level of funding available to
manage financial risk/unplanned expenditure. 
This includes the 2% contingency.  The 2023-
24 position is slightly more than 2022-23
which confirms there are sufficient reserves to
meet any unplanned expenditure.
Movement in the
Unallocated General
Fund Balance
(£0.6m) £1.06m Reflects the extent to which the Council is
using its Unallocated General Fund Balance
(excluding contingency). An increase in the
2023-24 balance to offset the reduction in the
previous year and provide a degree of stability
in the Council’s financial position.
In-year Council Tax
collection rate
96.82% 96.34% Reflects the Council's effectiveness in
collecting Council Tax debt compared to a
target of 96%.  The target continues to be
exceeded.    
Ratio of Council Tax
Income to Overall
Level of Funding
17.76% 19.9% Reflects the capacity of the Council to vary
expenditure by raising Council Tax income.  
Actual Outturn
compared to budgeted
expenditure
£3.273m 
1.06%
£1.728m 
0.55%
A measure of how the final outturn compares
to the budgeted position. The surplus is a
reflection of the effectiveness of the Council’s
financial management particularly the Loans
Fund.
Capital Financing
Requirement (CFR)
for the current year
£291.782m  £332.394m Measurement of requirement to borrow for
capital purposes.  The increase in 2023-24
reflects writing back the overpayment of the
debt element of Service Concession
arrangements in prior years.

Page 29

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 18 
Financial Indicator 2022-23 2023-24 Comment
External Debt Levels
for the current year
£142.536m £119.407m Actual borrowing for capital investment levels.
Reduction in 2023-24 due to the early
repayment of long term loans at a discounted
rate to achieve a treasury gain and minimal
need to borrow due to slippage in the capital
programme and cash balances.
Ratio of financing
costs to net revenue
stream
6.26% 2.74% Measures the percentage of income that has
been committed towards meeting the costs of
borrowing. The more income needed to fund
financing costs the less that is available to
meet other revenue expenditure. The ratio has
dropped in 2023-24 as we have repaid long
term borrowing during the year, used cash
balances to fund the capital programme and
delayed taking any new borrowing where
possible while interest rates were high. There
will be a need to increase borrowing again in
the future and this ratio will rise again. 
7. OUTLOOK
A five year financial outlook informing Council of the estimated budget gap covering the period 2024-25
to 2028-29 using best case, worse case and mid-range scenarios was kept up to date during 2023-24
and presented to the Policy and Resources Committee in May, August, October and December 2023.  
Preparing any forward looking financial outlook is challenging due to the levels of uncertainty, for
example the level of Scottish Government Grant, the impact of rising inflation and the uncertainty of pay
awards being agreed before the budget setting process. The assumptions used to inform the outlook are
reviewed, updated and reported regularly.  The Council has a strong track record in financial
management as recognised by previous years annual external audit reports and the Council’s Best Value

Page 30

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 19 
report issued in May 2020.  The chart below shows the cumulative budget gap over the next five years
as reported to the Policy and Resources Committee on 9 May 2024. 
Cumulative Budget Gap 2025-26 to 2029-30 as reported on 9 May 2024 
Budget Strategy
A Budget Approach report was presented to Policy and Resources Committee on 11 May 2023 where it
was agreed that a cross party Budget Working Group (BWG) be established comprising six elected
members from the administration, three elected members from the opposition and two Trade Union
representatives. The BWG’s role was to engage with officers and provide a sounding board to assist in
the development and identification of savings options. 
During 2023-24 the Council sought the views of the Community on high level priorities for the budget via
a budget simulator. A report outlining the feedback from this consultation was presented to Policy and
Resources Committee on 12 October 2023. This exercise allowed Elected Members to take into account
the views of the Community when considering and preparing the budget for 2024-25. 
A further budget update report was presented to Policy and Resources Committee on 7 December 2023
which set out the latest financial position, initial savings options and other pressures that may have to be
considered as part of the budget setting process. 
The BWG met on 18 September 2023, 9 November 2023 and 18 January 2024. During these meetings
Members were presented with the findings from the consultation, updates on the financial position and
savings options identified by officers. 
The Council continues to be committed to developing multi-year savings proposals with a focus on longer
term planning.  As part of the 2023-24 budget setting process savings that required more detailed work
that could be considered in future years were also identified and these are already being explored as part
of a pipeline of savings for future years. These include detailed reviews of the Roads and Infrastructure
and Education Services. 
Preparation is already well underway for the 2025-26 budget setting process and a report on the
proposed approach will be presented to Council on 27 June 2024. This includes a proposal to once again

Page 31

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 20 
create a cross party BWG.  There is no doubt that bridging the budget gap both in 2025-26 and future
years will be extremely challenging.  The budget gap is calculated using a number of assumptions and
there are three areas where a change to the assumptions could have the biggest impact on the
estimates: 
1. Scottish Government Grant – within the mid-range scenario, a 0.5% decrease has been assumed
which is similar to the reduction in 2024-25.  Every 1% change is circa £1.4m.  
2. Council Tax – within the mid-range scenario, a 5% increase has been assumed on the basis that the
majority of Councils increased their Council Tax by at least 5% in 2023-24 prior to the freeze in 2024-
25. This is an officer assumption, as this is a matter for Council to agree. Every 1% change is circa
£600k. 
3. Pay Award – within the mid-range scenario, a 2% increase has been assumed.  Every 1% change is
circa £1.7m. 
As previously noted, the budget outlook is extremely challenging and this is made more so by the ring-
fenced and directed spend by Scottish Government resulting in the budget where the Council is able to
exercise any control being a lot smaller.  It is hoped that the Verity House agreement may bring
opportunities for the un-ring-fencing of some areas of budget. 
Furthermore, in April 2024 a new Provost and Leader of the Council were appointed which was followed
by changes in Members of the administration. The new administration are currently considering their
priorities which could have an impact on decisions made as part of the budget setting process. 
Cost of Living Crisis
The ‘cost of living crisis’ refers to the fall in ‘real’ disposable incomes (that is, adjusted for inflation and
after taxes and benefits) that the UK has experienced since late 2021. It is being caused predominantly
by high inflation outstripping wage and benefit increases.  
Despite some stabilisation efforts, the persistent economic pressures are affecting both individuals and
Council services significantly. The Council continues to see significant increases in all areas of supplies,
but specifically in utilities, food and fuel costs and it will be extremely challenging to contain spending
within current resources. The Council remains committed to addressing these challenges through
strategic planning and support initiatives for individuals. 
Rural Growth Deal  
Our £70m Rural Growth Deal is about turning economic potential into a successful future for Argyll and
Bute. It is about investing in initiatives that will turn the area’s fantastic natural resources and business
innovation into a thriving local economy.  The Council signed the Heads of Terms in February 2021 and
is working on producing the full deal documentation, which includes a business case for each of the
themes within the deal.  The deal was due to be signed on 7 June 2024 by the Council and both the
Scottish and UK Governments but due to the calling of the UK General Election this has had to be
postponed. 
The project themes in the deal are as follows: 
Marine Tourism/Place Programme including the Rothesay Pavilion at Full Business Case
Low Carbon Economy - Islay
Rural Skills Accelerator
Housing – Isle of Mull and Isle of Islay 
Clyde Engineering & Innovation Centre
West Coast UAV 
Marine Aquaculture Programme.

Page 32

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 21 
Regular updates on progress are posted on the website, see link: Rural Growth Deal (argyll-bute.gov.uk). 
UK Government Levelling Up Agenda
Levelling Up Fund
The Levelling Up Partnership funding was announced by the UK Government in the 2023 Autumn
Statement and Argyll and Bute has been allocated up to £20m of Levelling Up Partnership funding.  The
process to choose the final projects is different to previous Levelling Up funding rounds and is very much
driven by the UK Government.  It was originally envisaged that a long list of projects would be identified
by May 2024 with a short list by mid-July 2024.  Business cases would then be developed by the UK
Government with a final decision made in September 2024.  There will be a degree of public consultation
led by the UK Government and the final decision on the successful projects will lie with the Secretary of
Stage (not the Council).  It is unclear how the General Election will impact on these timescales.  In terms
of the kind of projects, it very much follows the Levelling Up Agenda, that is business, transport
connectivity, community safety, skills and education and housing.  
Shared Prosperity Fund (UKSPF)
The UKSPF is a successor to the previous EU structural funds, it is viewed as a central pillar of the UK
Government’s Levelling Up agenda. The overarching aim of the UKSPF is to build pride in place and
increase life chances across the UK.
The project / programme activities outlined in the Argyll and Bute UKSPF Investment Plan are all aligned
to three key investment priorities: communities and place; supporting local business; and people and
skills, where each priority has predefined interventions, outputs and outcomes. In addition to core
UKSPF monies, the investment plan includes a focus on ring-fenced ‘Multiply’ funding to support the
delivery of an area-based adult numeracy programme. 
Argyll and Bute Council received an allocation from the UKSPF of just under £4.5m to support delivery
over three financial year, specifically the final three months of 2022-23 and the next two financial years,
2023-24 and 2024-25, until the end of March 2025. 
There are 21 projects funded under the Core UKSPF and another three projects support by the Multiply
programme (also part of the UKSPF £4.5m allocation). 
Aligned to UK Government guidance, any underspend for 2023/24 has been carried over and reprofiled
for 2024/25. It is anticipated that the full allocation will be spent by the end of March 2025. 
Learning Estate Investment Programme
The Councils bid to the Scottish Governments Learning Estate Investment Programme (LEIP) for funding
for a new school campus on Mull was successful. While this is good news and will provide welcome
investment in the school estate it does come with a financial pressure that is required to be funded if the
project is to proceed. 
The Scottish Government will fund up to 50% of eligible costs therefore the Council will be required to
fund circa £20m prior to any associated borrowing costs. A Members seminar was held on the 12 April
2024 and a report subsequently presented to Council on 25 April 2024 outlining the financial, economic,
community and educational implications of the proposed campus. Members agreed that up to £5m from
the previously agreed earmarked LEIP funding could be used to commence the Business Case,
undertake engagement exercises, commence the site selection process and establish governance
arrangements. To progress with the project beyond this point Members will consider the capital and
revenue budget provision required as part of the budget setting process.

Page 33

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 22 
Risks
The Council’s Strategic Management Team (SMT) actively manage strategic risks via a six monthly
review of the Strategic Risk Register (SRR) which adopts established risk management arrangements
including reviewing current mitigating measures and identifying key actions to further mitigate them.
These actions are designed to be consistent with the work required to deliver services which are aligned
to the Council’s objectives through the Council’s strategic and service plans.  Furthermore departmental
management teams review their operational risk registers (ORR) on a quarterly basis with all red risks
identified in ORRs being reported to the SMT to ensure they are sighted on all emerging high priority
risks. 
The SRR currently has 13 strategic risks which are categorised using a RAG (Red, Amber, Green)
Status based on the residual impact and likelihood of crystallisation after accounting for mitigation
measures.  There are currently four risks classified as red as set out in the diagram below which also
summarises the current mitigating actions.   These are issues that the Council continues to manage
through programmes of work such as the Rural Growth Deal, and the Levelling Up Fund, also the
progression of a new Waste Strategy with a particular focus on the 2025 ban on Biodegradable Municipal
Waste, reviewing contingency plans and disaster recovery plans in relation to Cyber Security and
addressing the Housing Emergency through a Housing Strategy and Investment Plan. 
8. CONCLUSION
The Council has continued to have good financial planning arrangements in place in 2023-24.  We have
managed the continued inflationary pressures and taken the opportunity to repay borrowing at a discount
which helped ensure that we operated within budget in 2023-24.   The utilisation of the Service
Concession flexibility has allowed us to earmark funds to address Council priorities and therefore not put
further pressure on the budget position. It is recognised that ongoing real term reductions in Scottish
Government core revenue grant continues to present significant financial challenges for all local
authorities, however, our council is in a strong position to manage the financially challenging times.
•Maximise external funding
•Rural Growth Deal
•Levelling Up Fund
•UK Shared Propsperity Funding Investment Plan
Population,
Infrastructure and
Economic Decline
•Developing options for new Waste Strategy
•Planning for impact of Bio-degradable Municipal Waste Ban 2025
•Planning for impact of Scottish Deposit Return SchemeWaste Management
•Contingency Planning
•Raising Cyber Security awareness
•Disaster Recovery Plan
•Work with Scottish Government Cyber Resilience Team
Cyber Security
•Housing Strategy and Investment Plan
•Housing Delivery Group
•Islands Programme Award of Funding for worker accomodation
Housing Availability

Page 34

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 23 
The Council are committed to deliver the best services to the people of Argyll and Bute within the
available resources.   
9. ACKNOWLEDGEMENTS
We would take this opportunity to acknowledge the significant effort in producing the Annual Accounts
and to record our thanks to both Elected Members and staff for their continued hard work and support. 
Kirsty Flanagan
Section 95 Officer
27 June 2024

Page 35

Statement of Responsibilities for the Annual Accounts 
www.argyll-bute.gov.uk   _______________________________________________ Page 24 
THE AUTHORITY'S RESPONSIBILITIES 
The Council is required:
• to make arrangements for the proper
administration of its financial affairs and to
ensure that one of its officers has the
responsibility for the administration of those
affairs (Section 95 of the Local Government
(Scotland) Act 1973).  In this Authority, that
officer is the Executive Director;
• to manage its affairs to secure economic,
efficient and effective use of resources and
safeguard its assets;
• to ensure the Annual Accounts are prepared in
accordance with legislation (The Local
Authority Accounts (Scotland) Regulations
2014), and so far as is compatible with that
legislation, in accordance with proper
accounting practices (section 12 of the Local
Government in Scotland Act 2003);
• to approve the Annual Accounts for signature. 
SECTION 95 OFFICER RESPONSIBILITIES
The Section 95 Officer is responsible for the
preparation of the Council's Annual Accounts in
accordance with proper practices as required by
legislation and as set out in the CIPFA/LASAAC Code
of Practice on Local Authority Accounting in the United
Kingdom (The Code).
In preparing the Annual Accounts, the Section 95
Officer has:
• selected suitable accounting policies and
applied them consistently;
• made judgements and estimates on a
reasonable basis;
• complied with legislation;
• complied with the Local Authority Accounting
Code of Practice 2023-24 (in so far as it is
compatible with legislation).
The Section 95 Officer has also:
• kept adequate accounting records which were
up to date;
• taken reasonable steps for the prevention and
detection of fraud and other irregularities. 
I certify that the Annual Accounts give a true and fair
view of the financial position of the Council and its
group at the reporting date and the transactions of the
Council and its group for the year ended 31 March
2024. 
Kirsty Flanagan
Section 95 Officer
27 June 2024

Page 36

Annual Governance Statement 
www.argyll-bute.gov.uk   _______________________________________________ Page 25 
1. BACKGROUND AND SCOPE OF RESPONSIBILITY 
Argyll and Bute Council’s (the Council) governance framework includes the systems, processes and
culture by which the Council is controlled, engages with communities and monitors the achievement
of strategic objectives. The Council conducts its business in accordance with the law and proper
standards. The Council has a duty to make arrangements to secure continuous improvement in the
way in which its functions are exercised, having regard to the economic, efficient and effective use of
public money. 
The system of internal control is a key part of the framework and is designed to manage risk to an
acceptable level.   
In discharging these responsibilities, the Council has put in place proper arrangements for the
governance of its affairs and the stewardship of the resources at its disposal. The Council has
approved and adopted a Local Code of Corporate Governance (the Code) which is consistent with
the principles and requirements of the CIPFA/SOLACE revised Framework for ‘Delivering Good
Governance in Local Government. This Statement explains how the Council has complied with the
Code and meets the requirements of current good practice. 
2. THE GOVERNANCE FRAMEWORK
The Code details how the Council will demonstrate compliance with the fundamental principles of
corporate governance for public sector bodies.  The seven key principles of our governance
arrangements in 2023/24 are described in the Code, along with our supporting principles and key
spects of our arrangements to ensure compliance. 
1. Behaving with integrity, demonstrating strong commitment to ethical values, and
respecting the rule of law.
We have four values, which underpin all that we do and provide a sound basis to achieve
transformation to ensure we meet the challenges of the future and deliver quality services. These
values are that we have a workforce which is: 
Caring  Committed  Collaborative  Creative  
The Council has developed a change programme ‘Connect for Success’ with the seven principles –
One Council One Place Approach, Purpose and Mission Focus, Employee Empowerment, Data and
Evidence Driven Decision Making, Learning Council, Agile and Maximise Opportunities that
Technology Offers - Connect for Success 
We have developed and communicated an Ethical Framework within the Council's Constitution,
which defines standards of behaviour for Members and staff. Protocols for Member/Officer relations
are also detailed within the Constitution.   
The Councillors’ Code of Conduct is set out at a national level, applying to all members in Scottish
local authorities and is incorporated into the Council’s Constitution as part of the ethical framework
which also includes a protocol for the Monitoring Officer. A Register of Members Interests is
publically available for inspection. In addition, the Constitution has a section on conduct at meetings
and meeting agendas require declarations of interest to be made where appropriate. Standing orders
for meetings are included within the Council’s constitution and training and support is provided to
members on their role in Council committees. 
Anti-fraud and whistleblowing policies are in place and the Council has adopted the Scottish Public
Services Ombudsman’s (SPSO’s) Model Complaints Handling Procedure.

Page 37

Annual Governance Statement 
www.argyll-bute.gov.uk   _______________________________________________ Page 26 
The Council complies with CIPFA’s Statement on the Role of the Chief Financial Officer in Local
Government. 
In addition, Professional advice on the discharge of statutory social work duties is provided to the
Council by the Chief Social Work (CSWO). 
A structure of governance and framework across our day to day activities and which supports
accountability, control, risk management and appropriate overview of the Council are outlined in the
diagram below:

Page 38

Annual Governance Statement 
www.argyll-bute.gov.uk   _______________________________________________ Page 27 
Decision Making /
Procedural
Council and
Committee Structure
Council and
Committee Terms of
Reference
Council and
Committee Standing
Orders
Scheme of Delegated
Functions
Standing Orders
Relating to Contracts
Councillor's Code of
Conduct
Corporate Governance
Executive Leadership
Team and Senior
Management Team
Risk Management
Integrity
HR and Individual
Capability
Strategic Planning
Performance
Management
Framework
Community Planning
and Empowerment
Stakeholder
Engagement
Financial Governance
Internal Control
ALEO Governance
Scheme of Delegation
ALEO Governance
Framework
Risk and Governance
Reporting
Financial and
Operational
Performance
ALEO Risk Register
Asset Governance
Corporate Asset
Management Strategy
Corporate Asset
Managment Plan and
Capital Plan
Records Management
Information
Management and
Security
Local Development
Plan
ICT and Digital
Strategy
Major
Programmes/Projects
Capital Investment
Programme
Conservation Area
Regeneration Scheme
(CARS) Projects
Campbeltown,
Helensburgh, Oban,
Rothesay & Dunoon
(CHORD) Projects
Marine Asset
Management Plan
Rural Growth Deal
Annual Status and
Options Report
External and Internal Audit and other regulatory inspections
Constitution, Governance, Risk Management and Accountability

Page 39

Annual Governance Statement 
www.argyll-bute.gov.uk   _______________________________________________ Page 28 
2. Ensuring openness and comprehensive stakeholder engagement.
We have established clear channels of communication with the community and other stakeholders through
our Communication Strategy.  Key mechanisms include:
Consultation Diary 
The Council has developed a consultation section on its website which hosts all consultations run by the
Council and includes a section which publicises the results and/or outcome of the consultation and the
resultant decisions that have been taken, showing how they were informed by the consultation process.
This is part of our commitment to You Said, We Did information sharing for the public. Consultations
provide communities with an opportunity to get involved with wide ranging aspects of the council’s work
and life in Argyll and Bute. 
These include for example, play park funding, active travel routes, primary school consultations, and the
council’s customer service strategy. 
Keep in the Loop Service  
Over 10,870 customers currently subscribe to receive notifications across the range of services. 
'Myaccount' is a secure sign-in service for accessing online public services in Scotland. It provides the
ability to set up an online account and use it to access a growing range of online public services,
Scotland-wide, including Argyll and Bute Council. Currently 16,744 customers up from 15,399 last year
have signed up to this service and it allows customers to access and personalise their interaction with
the Council on a range of services. 
Public Performance Reporting
The Council’s website makes all performance information available to the public. This includes information
on performance scorecards, budgets and other service related information. This promotes open
accountability to the public for its performance against agreed policies and standards. As part of phase
two of the performance excellence project a review of the council's approach to public performance
reporting is being undertaken.
Accessibility
In 2023/24 75% of 593,362 customer interactions through the council’s Customer Engagement Team
were made using digital self-service. This very high proportion is because of the scope and quality of the
digital services provided. In order to ensure maximum accessibility for everyone and meet our equalities
responsibilities, the Council’s website was upgraded to the latest software version Drupal 10 and its
content refreshed to meet the new international WCAG2.2 standard. 
In March 2024 it scored 98% in the Uk Independent Silktide accessibility score, rating it the 37th highest
ranking Council in the UK. In addition the Reachdeck supported access tool was added to the website to
give read aloud and translation help to users seeking such additional assistance and our 24/7 automated
telephone service was used 46,942 times by those customers who struggle with online digital services.
Community Engagement 
To support strengthening communities, community empowerment and engagement the council has in
place: 
• An officer Community Engagement Strategy Group to oversee the development and implementation
of the council’s internal Engagement Strategy; advising on best practice in engagement tools and
techniques, supporting skills development and capacity within the council to effectively engage with
communities. On this group sit those officers with expertise in engagement including those from
Corporate Communications and the Communities & Partnership Team. The Councils
Communications Team has developed an engagement app for services to use, and the council’s
Communities & Partnership Team has resources and expertise to support hard to reach groups,

Page 40

Annual Governance Statement 
www.argyll-bute.gov.uk   _______________________________________________ Page 29 
community organisations and remote communities to have a voice in decision making. 
• A Community Development service, with a focus on improving active citizenship and capacity
building through best practice in community development through a responsive and effectively
targeted programme of Community Development support internally to the council and externally
within communities across Argyll and Bute.
• A range of training and resources to help build the knowledge, skills and confidence of community
groups
• Funding support to help empower community organisations to take forward priority projects and
activities in their area: Monthly funding alert | Argyll and Bute Council (argyll-bute.gov.uk)
• Resourcing community council liaison activities, including training and support activity, which helps to
build the capacity of community councils.  
The Council also has a statutory lead role to ensuring Community Learning and Development provision
in Argyll and Bute is set out in an Argyll and Bute Community Learning and Development Strategic Plan,
and this is delivered through its collaboration with its Arms-length External Organisation (ALEO) partner
Live Argyll.
The Council continues to promote the Community-led action plan toolkit (developed in partnership with
Scottish Community Development Centre) to help support communities interested in developing a local
Community-led Action Plan. The Council also provides support for communities interested in
development a Place Plan: Local Place Plans | Argyll and Bute Council (argyll-bute.gov.uk)
The Council directly resources the management of the Community Planning Partnership (CPP) to bring
partners together, including community, to deliver on the Outcome Improvement Plan. It actively seeks to
ensure that young people are engaged in Community Planning and has implemented the following:
• The 3 local Members of the Scottish Youth Parliament (MSYP's) attend the Community Planning
Partnership Management Committee meetings on a rotational basis.  
• The Area Community Planning Groups (ACPG) invite members of local Youth Forums to attend
meetings when they are held in their local areas & information is passed on to young people by
Youth Workers who are kept updated on any developments. 
• The revised Scheme of Establishment for Community Councils outlines the requirement to
encourage young people to attend and participate in community council meetings” and the age to
become a Community Councillor was lowered to be 16 to encourage more young people to
become involved.
Council/Committee Meetings
Meetings are always held in public, unless one of the statutory exemptions in the Local Government
(Scotland) Act 1973, schedule 7A applies to the content of the report. Agendas for and minutes of meetings
are detailed on the Council’s website. When schedule 7A applies papers are adjusted to ensure that the
maximum amount of content is in the public domain.
The Council’s Constitution defines the roles and responsibilities of the administration, committees, scrutiny
and officer functions, with clear delegation arrangements and protocols for effective communication. 
The Standards Commission Advice Note for Councillors on Distinguishing between their Strategic Role
and any Operational Work has previously been included in an Elected Member Seminar and is hosted on
the Members Resource page on the Hub for ease of reference.

Page 41

Annual Governance Statement 
www.argyll-bute.gov.uk   _______________________________________________ Page 30 
3. Defining outcomes in terms of sustainable economic, social, and environmental benefits.
Our Corporate plan sets out our, and our community planning partner’s, vision for Argyll and Bute’s
economic success to be built on a growing population. It also defines our mission “To make Argyll and
Bute a place people choose to live, learn, work and do business” and establishes our outcomes, priorities
and approach to delivering on our shared ambition with our community partners.
We have a Performance Improvement Framework (PIF) that ensures performance is integral to the work
of the Council.  The PIF is focused not just on measuring what we do but on measuring the difference we
make in terms of our outcomes.   
Asset management planning and capital investment is structured to consider and balance the combined
economic, social and environmental impact of policies and plans when taking decisions about service
provision. The Council has put arrangements in place to comply with key elements of the Community
Empowerment Act.
In determining how services and other courses of action should be planned and delivered the Council is
increasingly engaging with internal and external stakeholders. Community benefit is an important
consideration in the procurement of goods and services.
The Council has acknowledges the effects of the ‘Cost of Living’ within Argyll and Bute and during
2023/2024 client gain achieved by the Flexible food and Fuel fund  project reached £3.8 million. This
project, supporting the most vulnerable low income households and those using foodbanks in our area to
access short-term grants to cover the cost of food and fuel in the short term. In the longer term support
through the provision benefit maximisation, money advice and energy advice services is provided by third
sector partner agencies. 
In addition, this year the Council has issued 1,300 Scotland Loves Local Gift Cards to low income
households in the year ensuring the £110,000 loaded onto the gift cards is spent in Island based local
businesses in Argyll and Bute. The Council and the Third Sector Interface is supporting the Poverty
Alliance on a project entitled “Taking Action on Rural Poverty” which is looking at new ways of addressing
rural poverty in Argyll and Bute by reducing the rural poverty premium.  
The Council has also provided a one-stop-shop webpage where individuals and families can access
energy advice, money advice and links to the services the Council provides in this area and those provided
by third sector partner organisations.
In 2022/23 Argyll & Bute Council recorded its lowest level of operational carbon emissions since reporting
commenced in 2015/16 via the Public Bodies Climate Change Duties. This represents a reduction of
12,952 tCO2e (tonnes of carbon dioxide equivalent), approximately 33% against baseline figures. Work
continues across Council services to reduce our emissions and support our journey to net zero including
the transition to energy efficient LED streetlighting, moving to electric or hybrid fleet vehicles, and
increasing diversion of waste from landfill.
Integrated impact assessments as well as environmental, sustainability and island implications are
considered during the decision making process to promote fair access to services.
4. Determining the interventions necessary to optimise the achievement of the intended
outcomes.
Decision makers receive detailed information indicating how intended outcomes would be achieved
together with the implications associated with the proposals covering financial, risks and mitigations,
integrated impact assessment, acting sustainably, carbon management, island proofing, and changes to
schemes, by way of the compulsory sections of the Committee report.
The Council’s Executive Leadership Team (ELT) meet regularly with the administration to discuss their
key priorities and requirements for decision making in addition there is regular survey and feedback on
their needs and a regular review of governance arrangements to ensure that decision making is fully
supported.

Page 42

Annual Governance Statement 
www.argyll-bute.gov.uk   _______________________________________________ Page 31 
In determining how services and other courses of action should be planned and delivered the Council is
increasingly engaging with internal and external stakeholders. Community benefit is an important
consideration in the procurement of goods and services.
The Council fosters effective relationships, collaborative working and contractual arrangements with
other public, private, and voluntary organisations in delivering services that meet the needs of the local
community as stated in the Council’s Corporate Plan 
5. Developing the entity’s capacity, including the capability of its leadership and the individuals
within it.
Elected Member Development
The Council has signed up to the Improvement Service’s Continuing Professional Development
Framework for Elected Members. All Elected Members are provided with opportunities to progress
personal development plans so that individual training needs and aspirations are identified and support
provided as appropriate. This is complemented by a comprehensive seminar and workshop programme
which addresses a wide range of topics and strategic issues. Additional training was undertaken by
Elected Members in relation to the technology, knowledge and skills necessary to support the transition
to a virtual environment including webcasting of strategic Committee meetings and the operation of
meetings on a hybrid basis, enabling a mixed attendance of members being physically or virtually
present.             
Officer Development
The Council supports officer development through a structured approach, driven by the values set out in
the Corporate Plan and a behavioural competency framework.
The Council has Argyll and Bute Manager and Leadership Programmes, which ensure that all employees
who have management responsibilities are knowledgeable and effective in delivering services within the
priority management policies and procedures of the Council, including finance, performance and people
management. The Leadership Programme ensures that senior and aspiring leaders in the organisation
have support to develop their leadership behaviours and to improve their overall impact and performance
across the organisation. 
6. Managing risks and performance through robust internal control and strong public financial
management. 
Internal Financial Control
Our standing orders, financial instructions, scheme of delegation and supporting procedure notes/manuals
clearly define how decisions are taken and the processes and controls in place to manage risks. These
are reviewed and updated on an annual basis. We ensure compliance with relevant laws and regulations,
internal policies and procedures, and that expenditure is lawful. The Council’s Monitoring Officer advises
on compliance with our policy framework, ensuring that decision making is lawful and fair. Furthermore
the Council has a designated Data Protection Officer and all services have Information Asset Registers
along with appropriate guidance on how data should be managed.
Our financial management arrangements conform to the CIPFA Statement on the Role of the Chief
Financial Officer and we ensure that our independent Audit and Scrutiny Committee undertakes the core
functions identified in CIPFA’s Audit Committees – Practical Guidance for Local Authorities. 
The Council has a proactive, holistic approach to tackling fraud, theft, corruption and crime, as an integral
part of protecting public finances, safeguarding assets, and delivering services effectively. It is based upon
the national counter fraud standard CIPFA’s Code of Practice on ‘Managing the Risk of Fraud and
Corruption’.
The Council has a system of internal financial control designed to manage risk to a reasonable level. It is
based on a framework of regular management information, financial regulations, administrative

Page 43

Annual Governance Statement 
www.argyll-bute.gov.uk   _______________________________________________ Page 32 
procedures (including segregation of duties), management supervision, and a system of delegation and
accountability. 
Development and maintenance of the system is undertaken by officers within the Council and the named
bodies mentioned below. 
Internal Financial Controls and Prevention  Are these in Place?
Comprehensive budget systems 
Financial and budget monitoring systems 
Financial and Performance reporting systems 
Clearly defined Capital Expenditure guidelines 
Project Management processes and disciplines 
An effective Internal Audit Section 
An effective Counter Fraud Team 
Internal controls cannot eliminate risk of failure to achieve policies, aims and objectives and can
therefore only provide reasonable and not absolute assurance of effectiveness. 
This annual review also covers the other bodies whose activities are incorporated into our Group Accounts
and reliance is placed on the formal audit opinion contained in the financial statements of each individual
body.
• Dunbartonshire and Argyll and Bute Valuation Board
• Live Argyll
• Argyll and Bute Integration Joint Board
The Council’s risk management processes are well developed. In particular the:
• Strategic Risk Register is updated twice a year and approved by the SMT
• Chief Executive presents the Strategic Risk Register to the Audit and Scrutiny Committee on an
annual basis
• Operational Risk Registers are updated quarterly by departmental management teams.
• Internal Audit will perform an audit of compliance with risk management arrangements every three
years.
• The CIA performs an annual strategic risk assurance mapping exercise. 
7. Implementing good practices in transparency, reporting, and audit to deliver effective
accountability 
Internal Audit 
The Council and its Group bodies have internal audit functions, which operate to Public Sector Internal
Audit Standards. The work of internal audit is informed by an analysis of the risk to which the Council and
its Group bodies are exposed, with annual internal audit plans prepared based on that analysis. The
Council's Audit and Scrutiny Committee endorses the preparation methodology and annual internal audit
plan and monitors the performance of Internal Audit in completing the plan. In addition, the Council has
developed a hybrid meeting facility enabling physical and virtual attendance at meetings with a public
broadcast function so that members of the public can see and hear meetings of the Council’s strategic
committees’ live increasing openness and transparency.

Page 44

Annual Governance Statement 
www.argyll-bute.gov.uk   _______________________________________________ Page 33 
The Chief Internal Auditor (CIA) provides the Audit and Scrutiny Committee with an annual report on
internal audit activity in the Council and an opinion of the assurance can be taken regarding the systems
of governance and internal control and whether they are operating effectively. This is an independent and
objective opinion of the CIA based on work carried out in conformance with the Public Sector Internal Audit
Standards to fulfil statutory Internal Audit provision.
Internal audit provides members and management of the Council with independent assurance on risk
management, internal control and corporate governance processes. External audit has, and continues to,
use the work of internal audit. 
The Annual Accounts and Report sets out the financial position in accordance with relevant accounting
regulations. 
Review of the Adequacy of Effectiveness of the Council’s Governance Framework 
Work to deliver Argyll and Bute’s Covid Recovery Strategy and Action plan continued in 2023/24 with the
same governance arrangements. Full details of the action plan is detailed in the document “Recovery,
Renew and Restart”, which was approved by Councils Economic, Development and Infrastructure
Committee.   
The Council has appropriate management and reporting arrangements to enable it to satisfy itself that its
approach to corporate governance is adequate and effective in practice. The legislative framework of local
government defines a number of posts which are primary to the Council’s governance
arrangements.  These include the Chief Executive, Pippa Milne fulfilling the role of Head of Paid Service.
As Monitoring Officer, the Executive Director Douglas Hendry: 
• oversees the implementation of the Code and monitoring its operation
• reports annually to the Council on compliance with the Code and any changes required to
maintain it and ensure its effectiveness.
Specific responsibilities are assigned to the Executive Director Kirsty Flanagan as the Council’s Chief
Financial Officer (S95 Officer), to ensure that public funds are properly accounted for.  In recognition of the
significant role that the Chief Financial Officer has in relation to financial performance and the financial
control environment, CIPFA has set out key principles that define the core activities and behaviours that
belong to the role.  These include, being a key member of the Leadership Team, being actively involved in
and influencing decision making, and leading the delivery of good financial management across the whole
organisation. The Council have appointed a Data Protection Officer in line with the requirements of the UK-
General Data Protection Regulations and the Data Protection Act 2018.
Covid Recovery Progress Report 2023/24
The Argyll and Bute Overarching Recovery Group (formed to lead this process with specific thematic
groups focused on Council recovery, building back stronger communities, economic and social recovery,
infrastructure and transportation, financial management and public health) continues to have an overview
of the Councils Covid Recovery Strategy and critical themes, although the majority of the actions have
either been completed or been mainstreamed into other strategic or operational plans. Key updates are as
follows:
a) Economic and Social Recovery: Issues and actions are incorporated within the Councils Economic
Strategy
b) Building Back Stronger Communities. Issues and actions are incorporated within the Corporate
Community Planning priorities
c) Our Modern Workspaces program. The Council have established hybrid working across its
activities and Our Modern Workspace project aims to look at how we use offices on a town by town
basis and take into account the needs of employees and members of the public, as well as any
opportunities for working more closely with partners. Good progress is being made to develop Hub
buildings and reducing heating and maintenance costs and our huge portfolio of buildings.

Page 45

Annual Governance Statement 
www.argyll-bute.gov.uk   _______________________________________________ Page 34 
d) The Joint Health Protection Plan, agreed by Argyll and Bute Council, Highland Council and NHS
Highland, sets out the public health arrangements for the management and control of public health
incidents and outbreaks, together with detailing our collective public health priorities for 2023-25. 
FINANCIAL SUSTAINABILITY 
It is anticipated the Scottish public sector will continue to face a very challenging short and medium term
financial outlook with uncertainty over the level of Scottish Government funding. The one year financial
settlements do not provide any degree of medium term certainty and ring-fencing of monies and
additional policy commitments which are not always fully funded limit financial flexibility and create
additional financial pressures. 
In June 2023 the Verity House agreement was signed by representatives from Scottish Local
Government and Scottish Government which signified a shared vision for a more collaborative approach
to delivering our Services. This agreement included a commitment to improve engagement on budgetary
matters and provide more flexibility to Local Authorities by baselining specific grants to allow them to be
utilised on local priorities. It has been disappointing to note that very little has changed in light of this
agreement with no engagement with Local Authorities prior to the Council Tax freeze announcement for
2024-25. 
The financial outlook continues to be impacted by higher levels of inflation than pre-COVID which results
in significant price increases as well as ongoing disruptions to the supply chain and longer lead in times.
Tender prices are substantially higher than in previous years meaning a reduced level of Service can be
provided for the same amount of money. 
The Council continues to provide financial estimates for future years with their medium term financial
outlook covering a five year window to provide a longer term view of the Council’s estimated budget gap.
Preparing any forward looking financial outlook is challenging due to the levels of uncertainty however
the assumptions are reviewed regularly and updated with the outlook prepared to reflect a best case,
worst case and mid-range scenario. 
The Council has a strong track record in financial management as recognised by previous year’s annual
external audit reports and the Council’s Best Value report issued in May 2020. The Best Value report
also recognises that the Council’s medium to long term financial strategy helps support financial planning
arrangements. In addition to providing revenue and capital projections the Strategy also sets out the
position in relation to the Council’s general fund reserve, the approach to managing the financial impact
of inflationary pressures, approach to Treasury Management and the strategy to address budget gaps. 
HEALTH AND SOCIAL CARE INTEGRATION
The Argyll and Bute IJB has been established as a separate legal entity from Argyll and Bute Council and
NHS Highland, with its own board of governance.  The IJB comprises eight voting members with four
Elected Members nominated by Argyll and Bute Council and four Board members from NHS Highland.  In
addition there are a number of non-voting appointees representing other sectors and stakeholder groups,
such as the Third Sector, Independent Sector, Patients and Service Users, Carers and Staff.  
The arrangements for the operation, remit and governance of the IJB are set out in the Argyll and Bute
Integration Scheme which has been prepared and approved by Argyll and Bute Council and NHS
Highland. It has also been approved by the Scottish Government. The IJB, via a process of delegation
from the Health Board and Local Authority as outlined in the Scheme of Integration has responsibility for
the planning, resourcing and operational delivery of all health and social care services within Argyll and
Bute.
The Council places reliance on the IJB’s framework of internal controls and similarly the IJB places reliance

Page 46

Annual Governance Statement 
www.argyll-bute.gov.uk   _______________________________________________ Page 35 
on the procedures, policies and operational systems of the Council and the Health Board. The IJB operates
within an established procedural framework. The roles and responsibilities of board members and officers
are defined within Standing Orders, the Integration Scheme, Financial Regulations and Standing Financial
Instructions.
The IJB has proportionate internal audit arrangements in place to provide independent assurance on risk
management, corporate governance and the system of internal control.   A risk based internal audit plan
developed and commissioned for 2023/24 and the IJB’s internal auditor has issued a formal annual report
providing their independent opinion on the effectiveness of the IJB’s risk management, internal control
and governance processes. The overall conclusion of the Internal Auditor is to provide a satisfactory level
of assurance on the adequacy of internal controls and governance arrangements within the IJB. 
During 2023-24 the IJB has progressed a number of initiatives to develop its governance arrangements
including improving the use of Directions and the implementation of the integrated performance
management system. It has also focused upon re-mobilising services following the pandemic, refreshing
its service transformation program and progressing strategic development projects. It has focused on
taking action to manage strategic risks during the year. However, it is acknowledged that budgetary
challenges have resulted in some key capital projects and business case development work being paused.
The financial position of the HSCP has also remained stable. It repaid all of the debt it owed to the Council
in 2021/22 and reported an underspend against its approved budget in 2023/24. The operating
environment going forward is very challenging as funding allocations have not kept pace with cost and
demand increases. The impact of an increasing older population with on-going recruitment constraints
and workforce shortages is adding to the challenge. The HSCP is working to address its workforce gaps
throughout the area and across many professions in a variety of ways. For example, it is seeking to
address key worker accommodation shortages in partnership with the Council, Shelter and the Social
Housing Sector and is constantly trying new approaches to attract workers from outside Argyll & Bute.
The new Health and Care Staffing act will also be progressively implemented throughout 2024/25 which
places additional duties upon the IJB to monitor, manage and report upon its staffing levels and risks.
These risks and challenges are particularly acute in many of our rural and island communities which are
experiencing increasing costs along with very small scale, lifeline services which are become ever more
difficult to sustain or operate in a financially efficient way. 
The IJB approved a budget for 2024/25 which indicates that additional funding from NHS Highland may
be required, although it is likely that any actual gap can be funded by the allocation of HSCP reserves.
The budget is also dependent upon the allocation of non-recurring pension fund savings held by Argyll &
Bute Council. The management of longer-term financial sustainability is a priority and service change and
transformation plans aimed at addressing this require to be developed, consulted upon and implemented
during the course of 2024/25 and 2025/26. The delivery of the short term savings plan is a priority for the
HSCP particularly as it seeks to manage down spend on expensive agency and locum staff whilst
maintaining the safety of services.
UPDATE ON AREAS FOR DEVELOPMENT IDENTIFIED IN PREVIOUS ANNUAL
GOVERNANCE STATEMENTS
The 2022/23 Annual Governance Statement identified a number of areas for further development. A
summary update for each area is provided in the table below.

Page 47

Annual Governance Statement 
www.argyll-bute.gov.uk   _______________________________________________ Page 36 
Area 2023/24 Update
Continue to engage with the Scottish
Government, other local authorities
and our Waste PPP contractor to
determine the most efficient and
effective way of ensuring the Council
can provide a waste solution which
complies with the 2025 Bio-
degradable Municipal Waste Ban 
We continue to pursue Scottish Government for either a
derogation or financial contribution of circa £1.5M to
enable the Waste PPP contract to be accommodated
alongside the 2025 BMW ban. At the time of writing (30
April 2024) we are still awaiting final confirmation from
Scottish Government although given the passage of time
we are now working on the basis that a derogation will not
be approved and are progressing discussions with Renewi
for MBT plants to be converted to Waste Transfer Stations
for use from January 2026 onwards, earlier if practical.
Further enhance reporting of
workforce planning to the Strategic
Management Team 
Workforce planning conversations took place with
Managers during January - March and operational
workforce plans are now being finalised for reporting to
SMT. Absence data is being included in the workforce
planning risk matrix to improve reporting to SMT. Progress
against actions outlined within operational workforce plans
will now be reported through regular Health of the
Organisation reporting to Department Management Teams
and SMT. The council approved its revised People
Strategy and updated strategic workforce planning
priorities in February. All strategic workforce planning
actions will be included in the annual People Strategy
delivery plan.
Continue to Improve quality and
accuracy of asset information which
will benefit asset valuations,
calculations for utilities costs and
asset management 
A further 57 condition surveys (7 within the school estate
and 50 within the non-school estate) and in accordance
with the Scottish Government’s Core Fact of Condition
were commissioned in 2023/24 and output will be
delivered in 2024/25. Additionally records were updated
through inspections and measurements undertaken as
part of the ongoing rolling programme of asset valuations.
Develop data/analytics business
intelligence tool 
The council is taking a two-pronged approach to building
its capacity for business intelligence, within the framework
of its new data strategy and action plan (2024-28)
approved by SMT in October 2023:
a) Microsoft PowerBI – PowerBI is one of the
products in the Microsoft 365 (M365) productivity
suite and includes some familiar aspects of
Microsoft Excel but with much greater capacity to
combine and visualise data from multiple sources.
Since the council has a long-term plan for the
adoption and utilisation of M365 it is the logical
tool for data visualisation and analysis. 
b) The data platform – The “minimum viable product”
(MVP) version of this was launched on 26/3/24
and is now available for staff to use. The Data
Platform will be essential to allowing
“democratised” access to data for use in PowerBI
report building by services themselves. The Data
Platform will also allow for access to datasets to
be controlled and managed by a robust
permissions framework; ensure consistent
application of data quality, ethics and standards;
and enable the FAIR Principles of making data
Findable, Accessible, Interoperable and Re-
usable.

Page 48

Annual Governance Statement 
www.argyll-bute.gov.uk   _______________________________________________ Page 37 
Complete review of performance
management 
Phase one of the Performance Excellence Project is now
complete with the following deliverables:
- Reduced set of Corporate Outcome Indicators to review
and report on long term trends and progress against
targets
- Decommissioning of Pyramid and development of new
Area Scorecards using MS365. 
- Development of a new Corporate Plan and Business
Plan setting out elected members overall priorities and the
activities and projects that will deliver on these.
- Design and Pilot of a new approach to Self-Assessment
which has been piloted at team level and thematic level. 
Phase Two of the project has been scoped and is now
underway. Phase two of the project will involve redesign
the council Performance Improvement Framework with
workstreams covering planning, design of performance
dashboards and the council's approach to public
performance reporting.
Complete the External Quality
Assessment Framework 
The External Quality Assessment was undertaken and
reported to the Audit and Scrutiny Committee. The findings
were that the Internal Audit service are fully compliant with
the Public Sector Internal Audit Standards in all 14 areas
of assessment. Two minor recommendations were made
and have been fully actioned. 
ISSUES FOR FURTHER DEVELOPMENT 
The review of governance and internal control has identified the following areas for consideration during
2024/25, particularly in the context of continuous improvement within the Council:
• Preparation for the implementation of the Visitor Levy in 2026 - Work with the Digital Office,
improvement Service, City of Edinburgh and Highland Council on the development of a new
digital platform for the billing and collection of the new levy. (Head of Financial Services/Head of
Development and Economic Growth – March 2025).
• Preparation for new processes being implemented including the practice around Initial Referral
Discussions relating to child protection, there will be a need to audit and develop practice further
and the development of an action plan based on the findings will help improvement and the need
to consider the staffing structures which support this vital area of work. (Head of Children,
Families and Justice – March 2025)
• Housing Emergency declared by the Council in June 2023 - Utilise outputs from the Housing
Summit held, to develop a multi-stakeholder Action Plan, and synthesise the relative elements of
this into a revised Local Housing Strategy Action Programme. (Head of Development and
Economic Growth – March 2025)
• The revaluation of properties for building insurances purposes - Estates will undertake a
revaluation programme for the general portfolio, together with a programme of recorded
inspections of vacant properties. (Head of Commercial services March 2025)
• Publication of the Annual Procurement Report for the Council – This will promote our obligations
set out in the Procurement Regulations. (Head of Legal and Regulatory Support – March 2025)
• The Licensing Board will undertake a review of its Licensing Policy statement as required in terms
of the Licensing (Scotland) Act 2005. (Head of Legal and Regulatory Support – March 2025)
• The use of Cloud Storage – Following results of the Internal Audit, put in place actions to ensure
optimum, appropriate and secure use of cloud storage is applied across all applications. (Head of
Customer Support Services – March 2025)
• Further enhance school engagement with national programmes and community partnership

Page 49

Annual Governance Statement 
www.argyll-bute.gov.uk   _______________________________________________ Page 38 
approaches supporting young people to build their confidence, increase mental health
awareness and promote diversity. (Head of Education, Performance & Improvement – March
2025).
CONCLUSION 
The conclusion from the review activity outlined above and our opinion is that reasonable assurance can
be placed upon the adequacy and effectiveness of Argyll and Bute Council’s systems of internal control
and governance. Although areas for further improvement have been identified, the annual review
demonstrates sufficient evidence that the Council’s Local Code of Corporate Governance is operating
effectively and that the Council complies with that Local Code in all significant respects. Systems are in
place to regularly review and improve governance and systems of internal control. 
Kirsty Flanagan
Section 95 Officer
27 June 2024

Page 50

The Remuneration Report 
www.argyll-bute.gov.uk   _______________________________________________ Page 39 
BACKGROUND
The Local Authority Accounts (Scotland) Regulations 2014 (SSI No.2014/200) require local authorities in
Scotland to prepare a Remuneration Report as part of the annual statutory accounts. All information
disclosed in the tables in this Remuneration Report were audited by Mazars. All other sections within the
Remuneration Report were reviewed by Mazars to ensure it is consistent with the Financial Statements. 
REMUNERATION POLICY AND ARRANGEMENTS
Councillors
The remuneration of councillors is regulated by the Local Governance (Scotland) Act 2004
(Remuneration) Regulations 2007 (SSI No 2020/26). The Regulations provide for the grading of
councillors for the purposes of remuneration arrangements. There are 4 grades of councillor in each local
authority for the purposes of payment of remuneration, the Leader of the Council; the Civic Head
(Provost); senior councillors; and councillors. The Leader of the Council and the Provost cannot be the
same person for the purposes of payment of remuneration. A senior councillor is a councillor who holds
a significant position of responsibility in the Council’s political management structure.
The Regulations also provide for the banding of local authorities. Argyll and Bute is in Band B and the
Council has determined the level of remuneration for councillors within that banding. The salary that is to
be paid to the Leader of the Council is set out in the Regulations. For 2023-24 the salary for the Leader of
Argyll and Bute Council is £40,205. The Regulations permit the Council to remunerate one civic head. The
Regulations set out the maximum salary that may be paid to that civic head. The Council’s civic head is
the Provost and their remuneration is set at £30,154 which is the maximum allowed for local authorities in
Band B.
The Regulations also set out the remuneration that may be paid to senior councillors in addition to the
Leader and Civic Head and the total number of senior councillors the Council may have. The maximum
yearly amount that may be paid to a senior councillor is 75% of the total yearly amount payable to the
Leader of the Council. The total yearly amount payable by the Council for remuneration of all its senior
councillors shall not exceed £0.352m. The Council is able to exercise local flexibility in the determination
of the precise number of senior councillors up to a maximum of 14 and their salary within these maximum
limits. The Council’s policy is to pay a salary of £30,154 to each appointed policy lead. Chairs of Area
Committees without a policy lead remit are paid a salary of £24,081.
In 2023-24, Argyll and Bute Council had 11 senior councillors in the administration (excluding the Provost
and the Leader). The total salary remuneration for senior councillors (excluding the Provost and the
Leader) during 2023-24 was £0.313m. The Regulations also permit the Council to pay contributions or
other payments as required to the Local Government Pension Scheme in respect of those councillors who
elect to become councillor members of the pension scheme.
Senior Employees
The salary of senior employees is set by reference to national arrangements as well as local decisions on
management structures and their associated remuneration levels. The Scottish Joint Negotiating
Committee (SJNC) for Local Authority Services (Chief Officials) sets the salary levels for the Chief
Executives of Scottish Local Authorities and also sets out the spinal column salary points for Chief Officers
which local authorities can utilise in setting the salary levels for posts within their authority. Circular 2023
IR 11.23b sets the amount of salary for the Chief Executive of Argyll and Bute Council for 2023-24. The
salaries of Executive Directors are paid at SCP 43 with Heads of Service being paid at SCP 29.

Page 51

The Remuneration Report 
www.argyll-bute.gov.uk   _______________________________________________ Page 40 
COUNCILLORS’ REMUNERATION
Councillors’ payments are made in accordance with the Local Governance (Scotland) Act 2004
(Remuneration) Regulations 2007 and The Local Government (Allowances and Expenses) (Scotland)
Regulations 2007.
The total amount of councillors’ remuneration paid by the Council during the year was: 
2022-23 2023-24
Actual Members Allowances Actual
£'000 £'000
476 Basic Councillor Salaries 464
66 Leader and Provost's Salary 70
258 Senior Councillor Salaries 313
29 Other Expenses and Allowances paid to Members 25
829 Total Allowances 872 
The annual return of councillors’ salaries and expenses for 2023-24 is available for any member of the
public to view at all Council libraries and public offices during normal working hours. It is also available
on the Council’s website at http://www.argyll-bute.gov.uk/council-and-government/councillors-
and- community-councillors.

Page 52

The Remuneration Report 
www.argyll-bute.gov.uk   _______________________________________________ Page 41 
SENIOR COUNCILLORS’ REMUNERATION
Additional disclosures are required for senior councillors’ remuneration. Senior councillors’ remuneration
is in accordance with the Local Governance (Scotland) Act 2004 (Remuneration) Regulations 2007 which
for the purpose of remuneration, grades Councillors as either the Leader of the Council, The Civic Head
(Provost), senior Councillors or Councillors. Details of senior Councillors’ remuneration are as follows:
2022-23
Total
Remuneration Senior Members Responsibility
Salary, Fees
and
Allowances
Taxable
Expenses
Total
Remuneration
£ £ £ £
18,059              Councillor Garret Corner Chair of Mid Argyll, Kintyre & the Islands Area
Committee from 24-11-22 24,054           - 24,054             
24,932              Councillor Maurice Corry Provost from 19-05-22 30,120           - 30,120             
38,254              Councillor Robin Currie Leader from 24-10-20 and Policy Lead for Strategic
Development from 24-11-22 40,160          -                40,160             
28,648              Councillor Kieron Green Policy Lead for Planning & Regulatory Services from 19-
05-22 30,120          -                30,120             
24,932              Councillor Amanda
Hampsey Policy Lead for Care Services from 19-05-22 30,120           - 30,120             
24,932              Councillor Andrew Kain Policy Lead for Roads and Transport and Chair of Oban,
Lorn & the Isles Area Committee from 19-05-22 30,120           - 30,120             
22,675              Councillor James Lynch Leader of the Largest Opposition Group from 19-05-22 24,054           - 24,054             
27,554              Councillor Liz McCabe Policy Lead for Islands and Business Development and
Chair of Bute & Cowal Area Committee from 19-05-22 30,120           - 30,120             
28,648              Councillor Yvonne McNeilly Policy Lead for Education 30,120          -                30,120             
24,932              Councillor Ross Moreland Policy Lead for Climate Change and Environment
Services from 19-05-22 30,120           - 30,120             
28,648              Councillor Gary Mulvaney Depute Leader from 26-09-19 and Policy Lead for
Finance and Commercial Services from 19-05-22 30,120          -                30,120             
22,675              Councillor Gemma Penfold Chair of Helensburgh & Lomond Area Committee from
19-05-22 24,054           - 24,054             
14,692              Councillor Alastair Redman Policy Lead for Economic Growth and Corporate
Services from 24-11-22 30,120          -                30,120             
2023-24
Senior Councillors’ remuneration in the tables above does not include non-taxable expenses.
The values in the table above relate to the actual payments made during 2023-24 which differ slightly from
those stated on page 39 due to timing differences in regards to payroll.  There is no compensation/loss of
office payments within the period and there were no benefits or bonuses paid during the year.

Page 53

The Remuneration Report 
www.argyll-bute.gov.uk   _______________________________________________ Page 42 
EMPLOYEES’ REMUNERATION
The Regulations require that local authorities provide an analysis of the number of employees whose
remuneration in the year was £50,000 or more, including those classified as senior employees who are
subject to separate disclosure requirements. The definition of remuneration includes all sums paid to or
receivable by an employee, expense allowances chargeable to tax and the monetary value of benefits
received other than in cash. This definition therefore includes all payments made to the employee in respect
of agreed employment terminations or retirements. However, employer pension contributions are excluded
from the definition.
Readers should be aware when making comparisons between years that, due to contractual incremental
pay increases, the number of employees covered by this disclosure will increase each year. In addition,
payments made in respect of agreed employment terminations or retirements can also distort the number
and/or banding of employees.
The number of employees whose remuneration, excluding employer pension contributions and including
redundancy/retirement payments, was £50,000 or more in bands of £5,000 was: 
Total 650330
£115,000 - £119,999 3-
£140,000 - £144,999 1-
£120,000 - £124,999 --
£135,000 - £139,999 -1
£125,000 - £129,999
£130,000 - £135,000 -
£105,000 - £109,999 1-
£110,000 - £114,999 -2
-
£95,000 -  £99,999 -1
£85,000 -  £89,999 131
£90,000 -  £94,999 21
Range 2023-242022-23
£ Number of OfficersNumber of Officers
£80,000 -  £84,999
£50,000 -  £54,999 303136
£60,000 -  £64,999 7964
£55,000 - £59,999 10583
9 7
--
£65,000 -  £69,999 7619
£75,000 -  £79,999 163
£70,000 -  £74,999 439
£100,000 - £104,999 11

Page 54

The Remuneration Report 
www.argyll-bute.gov.uk   _______________________________________________ Page 43 
SENIOR EMPLOYEES’ REMUNERATION
The table below provides details of the remuneration paid to the Council’s senior employees. This is
defined by the regulations as; 
• someone who has responsibility for the management of the organisation, 
• occupy a position which is politically restricted, or
• any additional employee whose annual remuneration is £150,000 or more (remuneration includes
salary, non-cash benefits and any lump sum payment for loss of employment) 
The following table sets out the remuneration disclosures for 2023-24 for senior officers:
Total
Remuneration
2022-23 Post Holder
Salary
(Including
Fees and
Allowances)
Taxable
Expenses
Total
Remuneration
2023-24
£ £ £ £
138,877             Chief Executive - Pippa Milne 143,625         510                 144,135            
112,406             Executive Director - Douglas Hendry 118,208         443                 118,651            
112,160             Executive Director, Section 95 Financial Officer - Kirsty
Flanagan 118,064         573                 118,637            
84,180              
Head of Children and Families and Criminal Justice
(Section 3 Social Work Officer) - David Gibson (from 14-09-
21)
89,237           89,237               
The following table sets out the remuneration disclosures for 2023-24 for Live Argyll: 
Total
Remuneration
2022-23
Post Holder
Salary
(Including
Fees and
Taxable
Expenses
Total
Remuneration
2023-24
£ £ £ £
84,180               Live Argyll General Manager (Subsidiary of Argyll & Bute
Council) - Kevin Anderson 89,237           -                  89,237

Page 55

The Remuneration Report 
www.argyll-bute.gov.uk   _______________________________________________ Page 44 
PENSION BENEFITS
Pension benefits for councillors and local government employees are provided through the Local
Government Pension Scheme (LGPS).
Councillors’ pension benefits are based on career average pay. A Councillor’s pay for pension purposes
for each year or part year ending 31 March (other than the pay in the final year commencing 1 April) is
increased by the increase in the cost of living, as measured by the appropriate index (or indices) between
the end of that year and the last day of the month in which their membership of the scheme ends. The total
of the revalued pay is then divided by the period of membership to calculate the career average pay. This
is the value used to calculate the pension benefits.
Local government employees had a final salary pension scheme prior to 1 April 2015. This means that
pension benefits are based on the final year’s pay and the number of years that person has been a member
of the scheme. As of 1 April 2015, local government employees are now part of a defined benefit pension
scheme worked out on a career average basis. Benefits accumulated are calculated using pensionable
pay each scheme year, rather than final salary. All benefits accumulated prior to 1 April 2015 are protected.
A five-tier contribution system is in place with contributions from scheme members based on how much
pay falls into each tier. This is designed to give more equality between the costs and benefits of scheme
membership.
The tiers and members contribution rates for 2023-24 are as follows: 
Whole time pay Contribution
Rate
2023-24
On earnings up to and including £25,300 5.50%
On earnings above £25,301 and up to £31,000 7.25%
On earnings above £31,001 and up to £42,500 8.50%
On earnings above £42,501 and up to £56,600 9.50%
On earnings of £56,601 and above 12.00% 
From 1 April 2015, if a person works part-time their contribution is worked out on their part-time pay rate
for the job. Prior to this, if a person worked part-time, their contribution rate was worked out on the whole-
time pay rate for the job with actual contributions paid on actual pay earned.
There is no automatic entitlement to a lump sum. Members may opt to give up (commute) pension for a
lump sum up to the limit set by the Finance Act 2004.
From 1 April 2015, benefits are calculated on the basis of a revalued annual pension built up of 1/49th of
pensionable pay each year, plus inflation to keep up with the cost of living. Prior to this date, the accrual
rate guaranteed a pension based on 1/60th of final pensionable salary and years of pensionable service.
Prior to 2009 the accrual rate guaranteed a pension based on 1/80th and a lump sum based on 3/80th of
final pensionable salary and years of pensionable service.
The value of the accrued benefits has been calculated on the basis of the age at which the person will first
become entitled to receive a full pension on retirement without reduction on account of its payment at that
age; without exercising any option to commute pension entitlement into a lump sum; and without any
adjustment for the effects of future inflation.

Page 56

The Remuneration Report 
www.argyll-bute.gov.uk   _______________________________________________ Page 45 
SENIOR COUNCILLORS’ PENSION BENEFITS
The pension entitlements for senior councillors for the year to 31 March 2024 are shown in the table below,
together with the contribution made by the Council to each senior Councillor’s pension during the year.
The pension benefits shown relate to the benefits that the individual has accrued as a consequence of
their relevant local government service and not just their current appointment.
In-year
pension
contributions
Accrued
pension
benefits Senior Members
In-year
pension
contributions
Accrued
pension
benefits
£ £'000 £ £'000
3,485             -                    Councillor Garret Corner Pension 4,642              1                    
-                   Lump Sum -                    
4,812             1                   Councillor Maurice Corry Pension 5,813              1                    
-                   Lump Sum -                    
7,383             8                   Councillor Robin Currie Pension 7,751              10                  
1                  Lump Sum 1                    
5,529             4                   Councillor Kieron Green Pension 5,813              5                    
Lump Sum -                    
4,812             1                   Councillor Amanda Hampsey Pension 5,813              1                    
-                   Lump Sum -                    
4,812             1                   Councillor Andrew Kain Pension 5,813              1                    
-                   Lump Sum -                    
4,376             2                   Councillor James Lynch Pension 4,642              3                    
-                   Lump Sum -                    
5,318             1                   Councillor Liz McCabe Pension 5,813              2                    
-                   Lump Sum -                    
5,529             3                  Councillor Yvonne McNeilly Pension 5,813              4                    
Lump Sum -                    
4,812             -                    Councillor Ross Moreland Pension 5,813              1                    
-                   Lump Sum -                    
5,529             8                   Councillor Gary Mulvaney Pension 5,813              9                    
2                  Lump Sum 2                    
4,376             1                   Councillor Gemma Penfold Pension 4,642              1                    
-                   Lump Sum -                    
2,836             2                  Councillor Alastair Redman Pension 5,813              1                    
Lump Sum -                    
For the year to 31 March
2023
For the year to 31 March
2024

Page 57

The Remuneration Report 
www.argyll-bute.gov.uk   _______________________________________________ Page 46 
SENIOR EMPLOYEES’ PENSION BENEFITS
The pension entitlements for senior employees for the year to 31 March 2024 are shown in the table below,
together with the contribution made by the Council to each senior employee’s pension during the year.
The pension benefits shown relate to the benefits that the individual has accrued as a consequence of
their relevant local government service and not just their current appointment.
In-year
pension
contributions
Accrued
pension
benefits Senior Officers
In-year
pension
contributions
Accrued
pension
benefits
£ £'000 £ £'000
26,709           70                 Pension 27,699            75                  
111              Lump Sum 111                
21,495           66                 Pension 22,786            70                  
112              Lump Sum 112                
21,495           37                 Pension 22,786            41                  
32                Lump Sum 32                  
16247 8                 
Head of Children and Families and
Criminal Justice (Section 3 Social Work
Officer) - David Gibson (from 14-09-21)
Pension 17,223            40                  
Lump Sum -                    
For the year to 31 March
2023
For the year to 31 March
2024
Chief Executive - Pippa Milne
Executive Director - Douglas Hendry
Executive Director, Section 95 Financial
Officer - Kirsty Flanagan
Live Argyll Senior Employees’ Pension Benefits
In-year
pension
contributions
Accrued
pension
benefits Senior Officers
In-year
pension
contributions
Accrued
pension
benefits
£ £'000 £ £'000
16,247           33                Pension 17,223            37                  
38                Lump Sum 40                  
For the year to 31 March
2024
Live Argyll General Manager (Subsidiary
of Argyll & Bute Council) - Kevin Anderson
For the year to 31 March
2023

Page 58

The Remuneration Report 
www.argyll-bute.gov.uk   _______________________________________________ Page 47 
EMPLOYEE EXIT PACKAGES
The numbers of exit packages with cost per band for compulsory and other redundancies are set
out in the table below:
Exit Package Cost Band
No £ No £ No £ No £ No £ No £
1    4,038        2     30,305      3    34,343      £0 - £20,000 2    13,896      -     -                2    13,896     
1    38,924      2     55,403      3    94,327      £20,001 - £40,000 -    -                -     -                -    -               
-    -                £40,001 - £60,000 -    -                -     -                -    -               
1     88,038      1    88,038      £60,001 - £80,000 -    -                -     -                -    -               
-    -                £80,001 - £100,000 -    -                -     -                -    -               
1    137,037    1     106,165    2    243,202    £100,001 - £150,000 1    134,437    1    127,350    2    261,787   
1    161,869    1    161,869    £150,001 - £200,000 -    -                -     -                -    -               
4 341,868 6 279,911 10 621,779 3 148,333 1 127,350 4 275,683
2022-23 2023-24
Compulsory
Redundancies Other Departures Total Compulsory
Redundancies Other Departures Total
For the purposes of this note, Exit Packages include:
• Redundancy payment;
• Strain on the fund cost (the amount which the Council is required to pay to the pension
fund because the employee has retired before the assumed retirement age);
• Added Years Lump Sum (the amount which the Council pays to the individual in a one-off
lump sum, according to the compensatory added years awarded – maximum three years);
and
• A capitalised value of the recurring Compensatory Added Years payment. This represents
the amount which the Council has to pay to the pension fund because the employee has
retired with enhanced service (maximum three years). This amount is paid on an annual
basis once a person has left employment with the Council and is therefore a notional cost
at 31 March 2024.
Termination costs for all Council employees who have accepted redundancy by 31 March 2024
are recognised in the Exit Packages note in 2023-24, or in previous financial years.  The total
cost recognised in the Exit Packages note in 2023-24 is £0.276m for 4 employees and in 2022-
23 was £0.622m for 10 employees.
The supplementary Termination Benefits Note 35 provides more information.

Page 59

The Remuneration Report 
www.argyll-bute.gov.uk   _______________________________________________ Page 48 
FACILITY TIME STATEMENT
Under the Trade Union (Facility Time Publication Requirements) Regulations 2017, the Council is
required to collect and publish data in relation to its usage and spend of trade union facility time
in respect of employees who are trade union representatives. Full details for the period 1 April
2023 to 31 March 2024 are attached at Appendix A.

Page 60

Statement of Comprehensive Income and Expenditure 
www.argyll-bute.gov.uk   _______________________________________________________________________________________  Page 49 
Gross
Expenditure
Gross
Income
Net
Expenditure
Gross
Expenditure
Gross
Income
Net
Expenditure
£'000 £'000 £'000 Service Note £'000 £'000 £'000
26,810        18,209       8,601           Chief Executive and Financial Services 1,281          95               1,186          
Executive Director Douglas Hendry
436            -             436              Executive Director 426            (1)               427             
33,399        4,250         29,149         Commercial Services 23,010        3,857          19,153        
106,026      13,620       92,406         Education 114,124      13,202        100,922       
15,942        4,371         11,571         Legal and Regulatory Support 17,520        4,241          13,279        
Executive Director Kirsty Flanagan
418            -             418              Executive Director 242            -             242             
Financial Services 25,613        18,639        6,974          
11,859        674            11,185         Customer Support Services 12,165        534             11,631        
25,256        14,380       10,876         Development and Economic Growth 23,138        13,849        9,289          
71,971        24,491       47,480         Roads and Infrastructure 75,990        29,300        46,690         -              -               174,434      94,948       79,486         Social Work 181,285      103,209      78,076        
9,897          2,303         7,594           Other Non-Departmental Costs 10,075        678             9,397          
476,448     177,246    299,202      Net Cost of Services 484,869     187,603     297,266     
2022-23 2023-24

Page 61

Statement of Comprehensive Income and Expenditure 
www.argyll-bute.gov.uk   _______________________________________________________________________________________  Page 50 
Other Operating Income and Expenditure:
(437)            Net (Gain)/loss on Disposal of Long Term Assets (262)            
1,643           Other Operating Income and Expenditure 8 1,670          
1,206       Total Other Operating Income and Expenditure 1,408       
Financing and Investment Income and Expenditure:
10,514         Interest Payable and Similar charges 14,037        
(2,966) Interest and Investment Income (4,779)         
141              Net Pension Interest Expense (6,596)         
7,689       Total Financing and Investment Income and Expenditure 2,662       
Taxation and Non-Specific Grant Income:
(191,775) General Government Grants (187,193)     
(22,549) Government Capital Grants and Other Capital Contributions 13 (23,550)       
(33,179) Non-domestic Rates Redistribution (37,645)       
(647)            Non-domestic Rates TIF (804)            
(53,900) Council Tax Income (61,909)       
(302,050) Total Taxation and Non-Specific Grant Income (311,101)  
6,047 (Surplus)/Deficit on Provision of Services 7.1 (9,765)     
(21,104) (Surplus)/Deficit on revaluation of Long Term Assets (10,097)       
(154,350)      Other Post Employment Benefits (Pensions) 31.2 (123,880)     
(175,454)  Other Comprehensive Income and Expenditure (133,977)  
(169,407)  Total Comprehensive Income and Expenditure (143,742)   
This statement shows the accounting cost in the year of providing services in accordance with generally accepted accounting practices, rather than the amount
to be funded from taxation. Councils raise taxation to cover expenditure in accordance with regulations; this may be different from the accounting cost. The
taxation position is shown in the Statement of Movement in Reserves.

Page 62

Balance Sheet 
www.argyll-bute.gov.uk   _________________________________________________ Page 51 
£'000 £'000 Note £'000 £'000
Long Term Assets
Property Plant & Equipment 15
451,018   - Other Land and Buildings 457,369  
10,872     - Vehicles, Plant, Furniture and Equipment 11,012    
235,076   - Infrastructure Assets 239,372  
8,892      - Community Assets 9,110     
3,286      - Surplus Assets 4,620     
21,440     - Assets Under Construction 35,724    
730,584     Total Property Plant & Equipment 757,207     
2,345         Heritage Assets 16 2,569        
733            Intangible Assets 17 888           
2,553         Investment Property 18 2,514        
5,492         Long Term Investments 27 492           
5,880         Long-Term Debtors 22 5,816        
139,014     Other Long Term Debtors (Pensions) 31 269,216     
886,601    Total Long Term Assets 1,038,702 
Current Assets
1,130      Inventories 1,043     
27,186     Short Term Debtors (Net of Impairment) 23 38,368    
1,554      Assets Held for Sale 24 1,619     
60,000     Short Term Investments 27,500    
823         Cash and Cash Equivalents 25 (9,991)    
90,693      Total Current Assets 58,539      
Current Liabilities
(11,818)   Short-term Borrowing 27 (13,478)  
(50,044)   Short-term Creditors 26 (52,374)  
(1,450)     Provisions 29 (1,665)    
(5,280)     Other Short Term Liabilities 28 (5,336)    
(68,592)     Total Current Liabilities (72,853)    
Long-term Liabilities
(132,155)  Borrowing Repayable within a Period in Excess
of 12 Months
27 (107,458) 
(107,033)  Other Long-term liabilities 28 (101,697) 
(2,444)     Provisions 29 (2,855)    
-             Capital Grant Receipts in Advance 30 (1,564)                                 
(241,632)   Total Long-term Liabilities (213,574)  
667,070    Total Assets less Liabilities 810,814    
31 March 202431 March 2023

Page 63

Balance Sheet 
www.argyll-bute.gov.uk   _________________________________________________ Page 52 
£'000 £'000 Note £'000 £'000
Unusable Reserves 32
174,952   - Revaluation Reserve 180,661  
268,788   - Capital Adjustment Account 249,093  
(1,871)     - Financial Instruments Adjustment Account (1,585)    
139,014   - Pensions Reserve 269,216  
(7,588)     - Accumulated Absences Account (8,272)    
573,295    689,113    
Usable Reserves 33
4,503      - Capital Funds 3,197     
2,916      - Repairs and Renewals Funds 2,763     
86,356     - General Fund Balance 115,741  
93,775      121,701    
667,070    Total Reserves 810,814    
31 March 202431 March 2023
The Balance Sheet is a snapshot of the value as at the 31 March 2024 of the assets and liabilities
recognised by the Council. The net assets of the Council (assets less liabilities) are matched by the
reserves held by the Council. Reserves are reported as follows:
• Unusable Reserves: are reserves that the Council is not able to use to provide services.
This category of reserves includes reserves that hold unrealised gains and losses (for
example the revaluation reserve), where amounts would only become available to provide
services if the assets are sold and reserves that hold timing differences shown in the
Movement in Reserves Statement line “Adjustments between accounting basis and funding
basis under regulations”.
• Usable Reserves: are reserves that the Council may use to provide services, subject to the
need to maintain a prudent level of reserves and statutory limitations on their use (for
example the capital receipts reserve that may only be used to fund capital expenditure or
repay debt). 
Kirsty Flanagan
Section 95 Officer
27 June 2024

Page 64

Statement of Movement in Reserves 
www.argyll-bute.gov.uk   ____________________________________________________________________________________ Page 53 
Unusable Reserves (Note 32)
Movements in 2023-24
General Fund
Balance
Repairs and
Renewals
Fund
Capital
Funds
Total Usable
Reserves
Revaluation
Reserve
Capital
Adjustment
Account
Pensions
Reserve
Financial
Instrument
Adjustment
Account
Accumu-
lated
Absences
Account
Total
Unusable
Reserves Total Reserves
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Balance at 31 March 2023 (86,356)      (2,916)     (4,503)   (93,775)      (174,952)    (268,788)  (139,014)       1,871       7,588     (573,295)    (667,070)       
(Surplus)/Deficit on Provision of Services (9,765)            (9,765)                               -   (9,765)                
Other Comprehensive Income and Expenditure -                 (10,097)          (123,880)           (133,977)       (133,977)            
Retrospective adjustment to the statutory repayment
of debt for service concession arrangements -
permitted flexibility
(36,038)          (36,038)          36,038 36,038           -                     
Total Comprehensive Income and
Expenditure (45,803)      -         -        (45,803)      (10,097)      36,038     (123,880)       -          -         (97,939)     (143,742)       
Adjustments between accounting basis and
funding basis under regulations:
Disposal of Assets 99                  (99)              
Amortisation of Intangible Assets -                 -                                  -                           -  
Depreciation of Non-current Assets (21,443)          (21,443)          21,443                    21,443                         -  
Impairment of Non-current Assets 2,576             2,576             (2,576)                      (2,576)                        -  
Capital Grants and Contributions credited to the
Comprehensive Income and Expenditure Statement 23,550           23,550           (23,550)                  (23,550)                        -  
Capital Expenditure Charged to the General Fund 1,616             1,616             (1,616)                      (1,616)                        -  
Net Gain or Loss on Sale of Non-current Assets 262                (671)         (409)               409                              409                         -  
Amount by which finance costs calculated in
accordance with the Code are different from the
amount of finance costs calculated in accordance
with statutory requirements
286                286                (286)                           (286)                        -  
Employee Benefits (684)               (684)               684                            684                         -  
Amount by which pension costs calculated in
accordance with the Code are different from the
contributions due under pension scheme regulations 6,322 6,322             (6,322)                           (6,322)                        -  
Usable Reserves (Note 33)

Page 65

Statement of Movement in Reserves 
www.argyll-bute.gov.uk   ____________________________________________________________________________________ Page 54 
Unusable Reserves (Note 32)
Movements in 2023-24
General Fund
Balance
Repairs and
Renewals
Fund
Capital
Funds
Total Usable
Reserves
Revaluation
Reserve
Capital
Adjustment
Account
Pensions
Reserve
Financial
Instrument
Adjustment
Account
Accumu-
lated
Absences
Account
Total
Unusable
Reserves Total Reserves
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Statutory Repayment of Debt - Loans Fund Advances 7,696             7,696             (7,696)                      (7,696)                        -  
Statutory Repayment of Debt - Finance Leases 48                  48                  (48)                                (48)                        -  
Statutory Repayment of Debt - NPDO Finance Lease 5,232             5,232             (5,232)                      (5,232)                        -  
In year adjustment to the statutory repayment of debt
for service concession arrangements - permitted
flexibility
(4,831)            (4,831)            4,831                        4,831                         -  
Total Statutory Adjustments 20,630       -         (671)      19,959       99              (14,134)    (6,322)          (286)        684        (19,959)     -               
Net (Increase)/Decrease before Transfers to
Other Statutory Reserves (25,173)      -         (671)      (25,844)      (9,998)        21,904     (130,202)       (286)        684        (117,898)    (143,742)       
Transfer to/from Other Statutory Reserves 77                  153            1,977       2,207             (2,207)                      (2,207)                        -  
Adjustments permitted by Accounting Standards for
depreciation that is related to the revaluation balance
rather than historic cost
(4,289)            (4,289)            4,289                          4,289                         -  
(Increase)/Decrease in Year (29,385)      153         1,306    (27,926)      (5,709)        19,697     (130,202)       (286)        684        (115,816)    (143,742)       
Balance at 31 March 2024 Carried Forward (115,741)    (2,763)     (3,197)   (121,701)    (180,661)    (249,093)  (269,216)       1,585       8,272     (689,113)    (810,814)       
Other Transfers required by Statute
Usable Reserves (Note 33)
Other Transfers
This Statement shows the movement in the 2023-24 financial year on the different reserves held by the Council, analysed into ‘Usable Reserves’ (i.e. those that
can be applied to fund expenditure or reduce local taxation) and “Unusable Reserves”. The ‘(Surplus)/Deficit on the Provision of Services’ line shows the true
economic cost of providing the Council’s services, more details of which are shown in Comprehensive Income and Expenditure Statement. These are different
from the statutory amounts required to be charged to the General Fund Balance for Council Tax setting purposes. The ‘Net (Increase)/Decrease before Transfers
to Other Statutory Reserves’ line shows the Statutory General Fund Balance before any discretionary transfers to or from earmarked reserves undertaken by
the Council.

Page 66

Statement of Movement in Reserves 
www.argyll-bute.gov.uk   ____________________________________________________________________________________ Page 55 
Unusable Reserves (Note 32)
Comparative Movements in 2022-23
General
Fund
Balance
Repairs
and
Renewals
Fund
Capital
Funds
Total Usable
Reserves
Revaluation
Reserve
Capital
Adjustment
Account
Pensions
Reserve
Financial
Instrument
Adjustment
Account
Accumu-
lated
Absences
Account
Total
Unusable
Reserves
Total
Reserves
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Balance at 31 March 2022 (96,081) (2,682)   (4,414)   (103,177)  (157,644) (241,331)   (4,634)      2,198       6,928      (394,483) (497,660)  
(Surplus)/Deficit on Provision of Services 6,047       6,047 -             6,047
Other Comprehensive Expenditure and Income (21,104)      (154,350)      (175,454)    (175,454)
Total Comprehensive Expenditure and
Income 6,047 -        -       6,047 (21,104)   -           (154,350)  -          -         (175,454) (169,407)
Adjustments between accounting basis and
funding basis under regulations:
Disposal of Assets
173             (173)
Amortisation of Intangible Assets -                               -                     -  
Depreciation and of Non-current Assets (20,947)    (20,947)        20,947        20,947                   -  
Impairment of Non-current Assets (3,128)      (3,128)          3,128          3,128                   -  
Capital Grants and Contributions credited to the
Comprehensive Income and Expenditure Statement 22,549     22,549         (22,549) (22,549)                  -  
Capital Expenditure Charged to the General Fund 2,938       2,938           (2,938) (2,938)                  -  
Net Gain or Loss on Sale of Non-current Assets 437          (568) (131)             131             131                   -  
Amount by which finance costs calculated in
accordance with the Code are different from the
amount of finance costs calculated in accordance
with statutory requirements
327          327              (327) (327)                  -  
Employee Benefits (660)         (660)             660             660                   -  
Amount by which pension costs calculated in
accordance with the Code are different from the
contributions due under pension scheme
regulations
(19,970) (19,970)        19,970 19,970                  -  
Usable Reserves (Note 33)

Page 67

Statement of Movement in Reserves 
www.argyll-bute.gov.uk   ____________________________________________________________________________________ Page 56 
Unusable Reserves (Note 32)
Comparative Movements in 2022-23
General
Fund
Balance
Repairs
and
Renewals
Fund
Capital
Funds
Total Usable
Reserves
Revaluation
Reserve
Capital
Adjustment
Account
Pensions
Reserve
Financial
Instrument
Adjustment
Account
Accumu-
lated
Absences
Account
Total
Unusable
Reserves
Total
Reserves
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Statutory Repayment of Debt - Loans Fund
Advances 20,317     20,317         (20,317) (20,317)                  -  
Statutory Repayment of Debt - Finance Leases 46            46                (46) (46)                  -  
Statutory Repayment of Debt - NPDO Finance  5,070       5,070           (5,070) (5,070)                  -  
Total Statutory Adjustments 6,979    -        (568)     6,411       173         (26,887)    19,970     (327)        660         (6,411)     -          
Net (Increase)/Decrease before Transfers
to Other Statutory Reserves 13,026  -        (568)     12,458     (20,931)   (26,887)    (134,380)  (327)        660         (181,865) (169,407)  
Transfer to/from Other Statutory Reserves 322          (234)         480          568              (568) (568)                  -  
Adjustments permitted by Accounting Standards for
depreciation that is related to the revaluation
balance rather than historic cost
(3,623)      (3,623)          3,623          3,623
-  
(Increase)/Decrease in Year 9,725    (234)      (88)       9,403       (17,308)   (27,455)    (134,380)  (327)        660         (178,810) (169,407)  
Balance at 31 March 2023 Carried Forward (86,356) (2,916)   (4,503)   (93,775)    (174,952) (268,788)   (139,014)  1,871       7,588      (573,295) (667,070)  
Other Transfers required by Statute
Usable Reserves (Note 33)
Other Transfers
This Statement shows the movement in the 2022-23 financial year on the different reserves held by the Council, analysed into ‘Usable Reserves’ (i.e. those that
can be applied to fund expenditure or reduce local taxation) and “Unusable Reserves”. The ‘(Surplus)/Deficit on the Provision of Services’ line shows the true
economic cost of providing the Council’s services, more details of which are shown in Comprehensive Income and Expenditure Statement. These are different
from the statutory amounts required to be charged to the General Fund Balance for Council Tax setting purposes. The ‘Net (Increase)/Decrease before Transfers
to Other Statutory Reserves’ line shows the Statutory General Fund Balance before any discretionary transfers to or from earmarked reserves undertaken by
the Council.

Page 68

Cash Flow Statement 
www.argyll-bute.gov.uk   ______________________________________________ Page 57 
The Cash Flow Statement shows the changes in cash and cash equivalents of the Council during the
reporting period. The statement shows how the Council generates and uses cash and cash equivalents
by classifying cash flows as operating, investing and financing activities. The amounts of net cash flow
arising from operating activities is a key indicator of the extent to which the operations of the Council are
funded by way of taxation and grant income or from the recipients of services provided by the Council.
Investing activities represent the extent to which cash outflows have been made for resources which are
intended to contribute to the Council’s future service delivery. Cash flows arising from financing activities
are useful in predicting claims on future cash flows by providers of capital (i.e. borrowing) to the Council.
2022-23 2023-24
£'000 Note £'000
6,047       Net (Surplus)/Deficit on the Provision of Services (9,765)      
(21,310)     Adjustments to net surplus or deficit on the provision of services for non-
cash movements 21,585      
5,955        Adjustments for items included in the net surplus or deficit on the provision
of services that are investing and financing activities 10,294      
(9,308)      Net Cash Flows from Operating Activities 39 22,114     
(14,323)     Net Cash Flows from Investing Activities 40 (38,637)     
42,536      Net Cash Flows from Financing Activities 41 27,337           
18,905 Net (Increase)/Decrease in Cash and Cash
Equivalents 10,814     
(19,728)     Cash and Cash Equivalents at the beginning of the Reporting
Period (823)          
(823)         Cash and Cash Equivalents at the end of the
Reporting Period 25 9,991

Page 69

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 58 
1. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES
1.1 General Principles
The Annual Accounts summarise the Council’s transactions for the 2023-24 financial year and its
position at the year-end of 31 March 2024. The Council must ensure that its Annual Accounts are
prepared in accordance with The Local Authority Accounts (Scotland) Regulations 2014, which section
12 of the Local Government in Scotland Act 2003 require to be prepared in accordance with proper
accounting practices. These practices primarily comprise the Code of Practice on Local Authority
Accounting in the United Kingdom 2023-24, supported by International Financial Reporting Standards
(IFRS) and statutory guidance issued under section 12 of the 2003 Act.
The accounts have been prepared under the historic cost convention, other than changes resulting from
the revaluation of certain categories of non-current assets and financial instruments, and on a going
concern basis.
1.2 Accruals of Income and Expenditure
Activity is accounted for in the year that it takes place, not simply when cash payments are made or
received. In particular:
• Revenue from contracts with service recipients, whether for services or the provision of goods,
is recognised when (or as) the goods or services are transferred to the service recipient in
accordance with the performance obligations in the contract.
• Supplies are recorded as expenditure when they are consumed – where there is a gap between
the date supplies are received and their consumption; they are carried as inventories on the
Balance Sheet.
• Expenses in relation to services received (including services provided by employees) are
recorded as expenditure when the services are received rather than when payments are made.
• Interest receivable on investments and payable on borrowings is accounted for respectively as
income and expenditure on the basis of the effective interest rate for the relevant financial
instrument rather than the cash flows fixed or determined by the contract.
• Where revenue and expenditure have been recognised but cash has not been received or paid,
a debtor or creditor for the relevant amount is recorded in the Balance Sheet. Where debts may
not be settled, the balance of debtors is written down and a charge made to revenue for the
income that might not be collected.
1.3 Cash and Cash Equivalents
Cash is represented by cash in hand and deposits with financial institutions repayable without penalty
of notice of not more than 24 hours. Cash equivalents are investments that mature in three months or
less from the date of acquisition and that are readily convertible to known amounts of cash with
insignificant risk of change in value.
In the Balance Sheet and Cash Flow Statement, cash and cash equivalents are shown net of bank
overdrafts that are repayable on demand and form an integral part of the Council’s cash management.
1.4 Prior Period Adjustments, Changes in Accounting Policies, Estimates and Errors
Prior period adjustments may arise as a result of a change in accounting policies or to correct a material
error. Changes in accounting estimates are accounted for prospectively, i.e. in the current and future
years affected by the change and do not give rise to a prior period adjustment.
Changes in accounting policies are only made when required by proper accounting practices or the
change provides more reliable or relevant information about the effect of transactions, other events and
conditions on the Council’s financial position or financial performance. Where a change is made, it is
applied retrospectively by adjusting opening balances and comparative amounts for the prior period as
if the new policy had always been applied.

Page 70

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 59 
Material errors discovered in prior period figures are corrected retrospectively by amending opening
balances and comparative amounts for the prior period.
1.5 Charges to Revenue for Non-Current Assets
Services, support services and trading accounts are debited with the following amounts to record the
cost of holding non-current assets during the year:
• Depreciation attributable to the assets used by the relevant service.
• Revaluation and impairment losses on assets used by the service where there are no
accumulated gains in the Revaluation Reserve against which the losses can be written off.
• Amortisation of intangible fixed assets attributable to the service.
The council is not required to raise Council Tax to fund depreciation, revaluation and impairment losses
or amortisation. However, it is required to make an annual contribution from revenue towards the
reduction in its overall borrowing requirement equal to an amount calculated on a prudent basis
determined by the Council in accordance with the Statutory Repayment of Loans Fund Advances.
Depreciation, revaluation and impairment losses and amortisation are therefore replaced by Loans Fund
principal repayments in the General Fund Balance by way of an adjusting transaction within the Capital
Adjustment Account in the Movement in Reserves Statement for the difference between the two.
1.6 Employee Benefits
1.6.1 Benefits Payable during Employment
Short-term employee benefits are those due to be settled wholly within 12 months of the year-end. They
include such benefits as wages and salaries, paid annual leave, paid sick leave and non-monetary
benefits (e.g. cars) for current employees. These benefits are recognised as an expense for services in
the year in which employees render service to the Council. An accrual is made for the cost of holiday
entitlements earned by employees but not taken before the year-end which employees can carry forward
into the next financial year. The accrual is made at the wage and salary rates applicable in the following
accounting year, being the period in which the employee takes the benefit. The accrual is charged to
the Surplus or Deficit on the Provision of Services, but then reversed out through the Movement in
Reserves Statement so that holiday entitlements are charged to revenue in the financial year in which
the holiday absence occurs.
1.6.2 Termination Benefits
Termination benefits are amounts payable as a result of a decision by the Council to terminate an
officer’s employment before the normal retirement date or an officer’s decision to accept voluntary
redundancy. They are charged on an accruals basis to the appropriate service segment in the
Comprehensive Income and Expenditure Statement at the earlier of when the Council can no longer
withdraw the offer of those benefits or when the Council recognised costs for a restructuring.
Where termination benefits involve the enhancement of pensions, statutory provisions require the
General Fund Balance to be charged with the amount payable by the Council to the pension fund or
pensioner in the year, not the amount calculated according to the relevant accounting standards. In  the
Movement in Reserves Statement, appropriations are required to and from the Pensions Reserve to
remove the notional debits and credits for pension enhancement termination benefits  and replace them
with debits for the cash paid to the pension fund and pensioners and any such amounts payable but
unpaid at the year-end.

Page 71

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 60 
1.6.3 Post-Employment Benefits
The Council participates in two separate pension schemes:
• The Scottish Teachers’ Pension Scheme administered by the Scottish Government.
• The Local Government (Scotland) Pensions Scheme administered by the Strathclyde Pension
Fund.
Both schemes provide defined benefits to members (retirement lump sums and pensions), earned while
employees work for the Council.
However, the arrangements for the teachers’ scheme mean that liabilities for these benefits cannot
ordinarily be identified specifically to the Council. The scheme is therefore accounted for as if it were a
defined contribution scheme. No liability for future payments of benefits is recognised in the Balance
Sheet and the Education Services line in the Comprehensive Income and Expenditure Statement is
charged with the employer’s contributions payable to the Teachers’ Pension Scheme in the year.
Local Government Pension Scheme
The Local Government Pension Scheme is accounted for as a defined benefits scheme:
• The liabilities of the Strathclyde Pension Fund attributable to the Council are included in the
Balance Sheet on an actuarial basis using the projected unit method – i.e. an assessment of the
future payments that will be made in relation to retirement benefits earned to date by employees,
based on assumptions about mortality rates, employee turnover rates and projected earnings for
current employees.
• Liabilities are discounted to their value at current prices, using a discount rate of 4.8% (based on
the indicative rate of return on a “high quality corporate bond of equivalent term and currency to
the liability” (as measured by the yield on iBoxx Sterling Corporates Index, AA over 15 years)).
• The assets of the Strathclyde Pension Fund attributable to the Council are included in the
Balance Sheet at their fair value:
 quoted securities – current bid price
 unquoted securities – professional estimate
 unitised securities – current bid price
 property – market value
The change in the net pension’s liability is analysed into the following components:
• Service cost comprising:
 Current service cost – the increase in liabilities as a result of years of service earned
this year - allocated in the Comprehensive Income and Expenditure Statement to the
services for which the employees worked.
 Past service cost – the increase in liabilities as a result of a scheme amendment or
curtailment whose effect relates to years of service earned in earlier years, debited
to the Surplus or Deficit on the Provision of Services in the Comprehensive Income
and Expenditure Statement.
 Net interest on the net defined benefit liability (asset), i.e. net interest expense for the
Council – the change during the period in the net defined benefit liability (asset) that
arises from the passage of time charged to the Financing and Investment Income and
Expenditure line of the Comprehensive Income and Expenditure Statement. This is
calculated by applying the discount rate used to measure the defined benefit
obligation at the beginning of the period to the net defined benefit liability (asset) at

Page 72

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 61 
the beginning of the period, taking into account any changes in the net defined liability
(asset) during the period as a result of contribution and benefit payments.
• Re-measurements comprising:
 The return on plan assets – excluding amounts included in the net interest on the net
defined benefit liability (asset), charged to the Pension Reserve as Other
Comprehensive Income and Expenditure.
 Actuarial gains and losses – changes in the net pensions liability that arise because
events have not coincided with assumptions made at the last actuarial valuation or
because the actuaries have updated their assumptions, charged to the Pensions
Reserve.
 Contributions paid to the Strathclyde Pension Fund – cash paid as employer’s
contributions to the pension fund in settlement of liabilities; not accounted for as an
expense.
In relation to retirement benefits, statutory provisions require the General Fund Balance to be charged
with the amount payable by the Council to the pension fund or directly to pensioners in the year, not the
amount calculated according to the relevant accounting standards. In the Movement in Reserves
Statement, this means that there are transfers to and from the Pensions Reserve to remove the notional
debits and credits for retirement benefits and replace them with debits for the cash paid to the pension
fund and pensioners and any such amounts payable to the fund but unpaid at the year-end. The negative
balance that arises on the Pensions Reserve thereby measures the beneficial impact to the General
Fund of being required to account for retirement benefits on the basis of cash flows rather than as benefits
earned by employees.
1.6.4 Post Employment Discretionary Benefits
The Council also has restricted powers to make discretionary awards of retirements benefits in the event
of early retirements. Any liabilities estimated to arise as a result of an award to any member of staff
(including teachers) are accrued in the year of the decision to make the award and accounted for using
the same policies as are applied to the Local Government Pension Scheme.
1.7 Events after the Reporting Period
Events after the Balance Sheet date are those events, both favourable and unfavourable, that occur
between the end of the reporting period and the date when the Annual Accounts are authorised for
issue. Two types of events can be identified:
• Those that provide evidence of conditions that existed at the end of the reporting period – the
Annual Accounts are adjusted to reflect such events.
• Those that are indicative of conditions that arose after the reporting period – the Annual
Accounts are not adjusted to reflect such events, but where a category of events would have a
material impact, disclosure is made in the notes of the nature of the events and their estimated
financial effect.
Events taking place after the date of authorisation for issue are not reflected in the Annual Accounts.
1.8 Financial Liabilities
Financial liabilities are recognised on the Balance Sheet when the Council becomes party to the
contractual provisions of a financial instrument and initially measured at fair value and carried at their
amortised cost. Annual charges to the Financing and Investment Income and Expenditure line in the
Comprehensive Income and Expenditure Statement for interest payable are based on the carrying value
of the liability, multiplied by the effective rate of interest for the instrument. The effective interest rate is
the rate that exactly discounts estimated future cash payments over the life of the instrument to the
amount at which it was originally recognised.

Page 73

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 62 
For most of the borrowings that the Council has, this means that the amount presented in the Balance
Sheet is the outstanding principal repayable (plus accrued interest) and interest charged to the
Comprehensive Income and Expenditure Statement is the amount payable for the year according to the
loan agreement.
Gains and losses on the repurchase or early settlement of borrowing are credited and debited to the
Financing and Investment Income and Expenditure line in the Comprehensive Income and Expenditure
Statement in the year of repurchase/settlement. However, where repurchase has taken place as part of
the restructuring of the loan portfolio that involves the modification or exchange of existing instruments,
the premium or discount is respectively deducted from or added to the amortised cost of the new or
modified loan and the write-down to the Comprehensive Income and Expenditure Statement is spread
over the life of the loan by an adjustment to the effective interest rate.
Where premiums and discounts have been charged to the Comprehensive Income and Expenditure
Statement, regulations allow the impact on the General Fund Balance to be spread over future years.
The Council has a policy of spreading the gain/loss over the term that was remaining on the loan against
which the premium was payable or discount receivable when it was repaid. The reconciliation of amounts
charged to the Comprehensive Income and Expenditure Statement to the net charge required against
the General Fund Balance is managed by a transfer to or from the Financial Instruments Adjustment
Account in the Movement in Reserves Statement.
1.9 Financial Assets
Financial assets are classified based on a classification and measurement approach that reflects the
business model for holding the financial assets and their cashflow characteristics. There are three main
classes of financial assets measured at:
• Amortised cost
• Fair value through profit or loss, and
• Fair value through other comprehensive income
The Council’s business model is to hold investments to collect contractual cash flows. Financial assets
are therefore classified as amortised cost, except for those whose contractual payments are not solely
payment of principal and interest (i.e. where the cash flows do not take the form of a basic debt
instrument).
Financial Assets Measured at Amortised Cost
Financial assets measured at amortised cost are recognised on the Balance Sheet when the Council
becomes a party to the contractual provisions of a financial instrument and are initially measured at  fair
value. They are subsequently measured at their amortised cost. Annual credits to the Financing and
Investment Income and Expenditure line in the Comprehensive Income and Expenditure Statement for
interest receivable are based on the carrying amount of the asset multiplied by the effective rate of
interest for the instrument. For most of the financial assets held by the Council, this means that the
amount presented in the Balance Sheet is the outstanding principal receivable (plus accrued interest)
and interest credited to the Comprehensive Income and Expenditure Statement is the amount receivable
for the year in the loan agreement.
Financial Assets Measured at Fair Value through Profit or Loss
Financial assets that are measured at fair value through profit or loss are recognised on the Balance
Sheet when the Council becomes a party to the contractual provisions of a financial instrument and are
initially measured and carried at fair value. Fair value gains and losses are recognised as they arrive in
the Surplus or Deficit on the Provision of Services.
The fair value measurements of the financial assets are based on the following techniques:
• Instruments with quoted market prices – the market price

Page 74

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 63 
• Other instruments with fixed and determinable payments – discounted cash flow analysis
The inputs to the measurement techniques are categorised in accordance with the following three levels:
• Level 1 inputs – quoted prices (unadjusted) in active markets for the identical assets that the
Council can access at the measurement date.
• Level 2 inputs – inputs other than quoted prices included within Level 1 that are observable for
the asset, either directly or indirectly.
• Level 3 inputs – unobservable inputs for the asset.
Any gains and losses that arise on the derecognition of the asset are credited or debited to the Financing
and Investment Income and Expenditure line in the Comprehensive Income and Expenditure Statement.
Expected Credit Loss Model
The Council recognises expected credit losses on all of its financial assets held at amortised cost, either
on a 12-month or lifetime basis. The expected credit loss model also applies to lease receivables and
contract assets. Only lifetime losses are recognised for trade receivables (debtors) held by the Council.
1.10 Government Grants and Contributions
Whether paid on account, by instalments or in arrears, government grants and third party contributions
and donations are recognised as due to the Council when there is reasonable assurance that:
• The Council will comply with the conditions attached to the payments; and
• The grants or contributions will be received.
Amounts recognised as due to the Council are not credited to the Comprehensive Income and
Expenditure Statement until conditions attached to the grant or contribution have been satisfied.
Conditions are stipulations that specify that the future economic benefits or service potential embodied
in the asset in the form of the grant or contribution are required to be consumed by the recipient as
specified, or future economic benefits or service potential must be returned to the transferor.
Monies advanced as grants and contributions for which conditions have been satisfied are carried in the
Balance Sheet as creditors. When conditions are satisfied, the grant or contribution is credited to the
relevant service line (attributable revenue grants and contributions) or Taxation and Non-Specific Grant
Income and Expenditure (non-ringfenced revenue grants and all capital grants) in the Comprehensive
Income and Expenditure Statement.
Where capital grants are credited to the Comprehensive Income and Expenditure Statement, they are
reversed out of the General Fund Balance in the Movement in Reserves Statement. Where the grant
has yet to be used to finance capital expenditure, it is posted to the Capital Grants Unapplied Account.
Where it has been applied, it is posted to the Capital Adjustment Account. Amounts in the Capital Grants
Unapplied Account are transferred to the Capital Adjustment Account once they have been applied to
fund capital expenditure.
1.11 Heritage Assets
The main heritage assets held by the Council are two art collections, an archaeology collection and a
historic jail and courthouse which is operated as a “living” museum. The “Argyll Collection” is an art
collection which was set up to provide the young people of Argyll and Bute with direct access to a wide
range of quality art recognising that they had limited access to museums and galleries. In addition, the
Council holds other works of art which are held at various libraries and the Campbeltown Museum.
Heritage Assets are recognised and measured (including the treatment of revaluation gains and losses)
in accordance with the Council’s accounting policies on property, plant and equipment. However, some
of the measurement rules are relaxed in relation to heritage assets as detailed below.
The Council’s main heritage assets are accounted for as follows:

Page 75

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 64 
The Art Collections
The collections cover a range of media including acrylic, charcoal, embroidery, engraving, etching,
gouache, lithography, oil, pastel, pencil, procion dye, screenprint, monoprint, watercolour, woodcut,
ceramic, bronze and woodcarving. These items are reported in the Balance Sheet at insurance valuation
which is based on market values. These valuations are updated periodically. The assets within the art
collections are deemed to have indeterminate lives and a high residual value; hence the Council does
not consider it appropriate to charge depreciation.
Acquisitions are made by purchase or donation. Acquisitions are initially recognised at cost and
donations are recognised at valuation with valuations provided by external valuers and with reference
to appropriate commercial markets using the most relevant and recent information from sales at
auctions.
Inveraray Jail and Courthouse and “Other” Historic Buildings
The building is owned by Argyll and Bute Council and leased out to an organisation which runs it as a
“living museum”. The building is valued in accordance with the Council’s property, plant and equipment
policy. Other buildings included in this category are McCaig’s Folly in Oban, the Argyll Mausoleum and
Castle Lodge in Dunoon.
Archaeology and “Other” Museum Exhibits
The Council has obtained specialist valuations for the archaeology collection held within Campbeltown
Museum which covers a range of objects including swords, bones, pottery, stone and leather remains.
Similar to the Art Collections, these items are reported in the Balance Sheet at insurance valuation which
is based on market values. These valuations will be updated periodically. The assets within the collection
are deemed to have indeterminate lives and a high residual value; hence the Council does not consider
it appropriate to charge depreciation.
Heritage Assets – General
The carrying amounts of heritage assets are reviewed where there is evidence of impairment for heritage
assets, e.g. where an item has suffered physical deterioration or breakage or where doubts arise as to
its authenticity. Any impairment is recognised and measured in accordance with the Council’s general
policies on impairment (see note 1.19.3 in this summary of significant accounting policies). The proceeds
of any disposals are accounted for in accordance with the Council’s general provisions relating to the
disposal of property, plant and equipment. Disposal proceeds are disclosed separately in the notes to
the financial statements and are accounted for in accordance with statutory accounting requirements
relating to capital expenditure and receipts (see note 1.19.4 in this summary of significant accounting
policies).
1.12 Intangible Assets
Expenditure on non-monetary assets that do not have physical substance but are controlled by the
Council as a result of past events (e.g. software licences) is capitalised when it is expected that future
economic benefits or service potential will flow from the intangible asset to the Council.
Expenditure on the development of websites is not capitalised if the website is solely or primarily
intended to promote or advertise the Council’s goods or services.
Intangible assets are measured initially at cost. Amounts are not revalued, as the fair value of the assets
held by the Council cannot be determined by reference to an active market. The depreciable amount of
an intangible asset is amortised over its useful life to the relevant service lines in the Comprehensive
Income and Expenditure Statement. An asset is tested for impairment whenever there is an indication
that the asset might be impaired – any losses recognised are posted to the relevant service lines in the
Comprehensive Income and Expenditure Statement. Any gain or loss arising on the disposal or
abandonment of an intangible asset is posted to the Other Operating Expenditure line in the
Comprehensive Income and Expenditure Statement.

Page 76

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 65 
Where expenditure on intangible assets qualifies as capital expenditure for statutory purposes,
amortisation, impairment losses and disposal gains and losses are not permitted to have an impact on
the General Fund Balance. The gains and losses are therefore reversed out of the General Fund
Balance in the Movement in Reserves Statement and posted to the Capital Adjustment Account.
1.13 Interests in Companies and Other Entities
The Council has material interests in companies and other entities that have the nature of subsidiaries,
associates or joint ventures and requires to prepare Group Accounts. In the Council’s own single entity
accounts, the interests in companies and other entities are recorded as financial assets at cost, less any
provision for losses.
1.14 Inventories
Inventories are included in the Balance Sheet at the lower of cost and net realisable value. The cost of
inventories is assigned using the weighted average costing formula.
1.15 Investment Properties
Investment properties are those that are used solely to earn rentals and/or for capital appreciation. The
definition is not met if the property is used in any way to facilitate the delivery of services or production
of goods or is held for sale.
Investment properties are measured initially at cost and subsequently at fair value, being the price that
would be received to sell such an asset in an orderly transaction between market participants at the
measurement date. As a non-financial asset, investment properties are measured at highest and best
use. Properties are not depreciated but are revalued annually according to market conditions at the
year-end. Gains and losses on revaluation are posted to the Financing and Investment Income and
Expenditure line in the Comprehensive Income and Expenditure Statement. The same treatment is
applied to gains and losses on disposal.
Rentals received in relation to investment properties are credited to the Financing and Investment
Income line and result in a gain for the General Fund Balance. However, revaluation and disposal gains
and losses are not permitted by statutory arrangements to have an impact on the General Fund Balance.
The gains and losses are therefore reversed out of the General Fund Balance in the Movement in
Reserves Statement and posted to the Capital Adjustment Account.
1.16 Leases
Leases are classified as finance leases where the terms of the lease transfer substantially all the risks
and rewards incidental to ownership of the property, plant or equipment from the lessor to the lessee.
All other leases are classified as operating leases.
Where a lease covers both land and buildings, the land and buildings elements are considered
separately for classification.
Arrangements that do not have the legal status of a lease but convey a right to use an asset in return
for payment are accounted for under this policy where fulfilment of the arrangement is dependent on the
use of specific assets.
1.16.1 The Council as Lessee
a) Finance Leases
Property, plant and equipment held under finance leases is recognised on the Balance Sheet at the
commencement of the lease at its fair value measured at the lease’s inception (or the present value of
the minimum lease payments, if lower). The asset recognised is matched by a liability for the obligation
to pay the lessor. Initial direct costs of the Council are added to the carrying amount of the asset.
Premiums paid on entry into a lease are applied to writing down the lease liability.

Page 77

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 66 
Lease payments are apportioned between:
• A charge for the acquisition of the interest in the property, plant or equipment – applied to write
down the lease liability, and
• A finance charge (debited to the Financing and Investment Income and Expenditure line in the
Comprehensive Income and Expenditure Statement).
Property, plant and equipment recognised under finance leases is accounted for using the policies
applied generally to such assets, subject to depreciation being charged over the lease term if this is
shorter than the asset’s estimated useful life.
The Council is not required to raise Council Tax to cover depreciation or revaluation and impairment
losses arising on leased assets. Instead, a prudent annual contribution is made from revenue funds
towards the deemed capital investment in accordance with statutory requirements. Depreciation and
revaluation and impairment losses are therefore substituted by a revenue contribution in the General
Fund Balance, by way of an adjusting transaction with the Capital Adjustment Account in the Movement
in Reserves Statement for the difference between the two.
b) Operating Leases
Rentals paid under operating leases are charged to the Comprehensive Income and Expenditure
Statement as an expense of the services benefiting from use of the leased property, plant or equipment.
Charges are made on a straight-line basis over the life of the lease, even if this does not match the
pattern of payments (e.g. there is a rent-free period at the commencement of the lease).
1.16.2 The Council as Lessor
a) Finance Leases
Where the Council grants a finance lease over a property or an item of plant and equipment, the relevant
asset is written out of the Balance Sheet as a disposal. At the commencement of the lease, the carrying
amount of the asset in the Balance Sheet (whether property, plant and equipment or assets held for
sale) is written off to the Other Operating Expenditure line in the Comprehensive Income and
Expenditure Statement as part of the gain or loss on disposal. A gain, representing the Council’s net
investment in the lease, is credited to the same line in the Comprehensive Income and Expenditure
Statement also as part of the gain or loss on disposal (i.e. netted off against the carrying value of the
asset at the time of disposal), matched by a lease (long-term debtor) asset in the Balance Sheet.
Lease rentals receivable are apportioned between:
• A charge for the acquisition of the interest in the property – applied to write down the lease
debtor (together with any premiums received); and
• Finance income (credited to the Financing and Investment Income and Expenditure line in the
Comprehensive Income and Expenditure Statement).
The gain credited to the Comprehensive Income and Expenditure Statement on disposal is not permitted
by statute to increase the General Fund Balance and is required to be treated as a capital receipt. Where
a premium has been received, this is posted out of the General Fund Balance to the Capital Receipts
Reserve in the Movement in Reserves Statement. When the future rentals are received, the element for
the capital receipt on disposal of the asset is used to write down the debtor. At this point, the deferred
capital receipts are transferred to the Capital Receipts Reserve.
The written-off value of disposals is not a charge against Council Tax, as the cost of fixed assets is fully
provided for under separate arrangements for capital financing. Amounts are appropriated to the Capital
Adjustment Account from the General Fund Balance in the Movement in Reserves Statement.

Page 78

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 67 
b) Operating Leases
Where the Council grants an operating lease over a property or an item of plant or equipment, the asset
is retained in the Balance Sheet. Rental income is credited to the relevant Service lines in the
Comprehensive Income and Expenditure Statement, with the exception of rental income from
investment property which is credited to Interest and Investment Income. Credits are made on a straight
line basis over the life of the lease, even if this does not match the pattern of payments (e.g. there is a
premium paid at the commencement of the lease). Initial direct costs incurred in negotiating and
arranging the lease are added to the carrying amount of the relevant asset and charged as an expense
over the lease term on the same basis as rental income.
1.17 Overheads and Support Services
The costs of overheads and support services are not charged to service segments in accordance with
the Council’s arrangements for accountability and financial performance.
1.18 Assets Held for Sale
Property, plant and equipment are classified as Assets Held for Sale when the following criteria are
met:
• The property is available for immediate sale in its present condition.
• The sale must be highly probable; and an active programme to locate a buyer and complete
the plan must have been initiated.
• The asset must be actively marketed for sale at a price that is reasonable in relation to its
current fair value.
• The sale should be expected to qualify for recognition as a completed sale within one year
(although events or circumstances may extend the period to complete the sale beyond one
year).
When these criteria are met, assets within the category of Property, Plant and Equipment will be
reclassified as Assets Held for Sale.
1.19 Property, Plant and Equipment
Assets that have physical substance and are held for use in the production or supply of goods or
services, for rental to others, or for administrative purposes that are expected to be used during more
than one financial year are classified as Property, Plant and Equipment.
1.19.1 Recognition
Expenditure on the acquisition, creation, or enhancement of Property, Plant and Equipment is
capitalised on an accruals basis, provided that it is probable that the future economic benefits or service
potential associated with the item will flow to the Council and the cost of the item can be measured
reliably. Expenditure that maintains but does not add to an asset’s potential to deliver future economic
benefits or service potential (i.e. repairs and maintenance) is charged as an expense when it is incurred.
1.19.2 Measurement
Assets are initially measured at cost, comprising:
• The purchase price.
• Any costs attributable to bringing the asset to the location and condition necessary for it to be
capable of operating in the manner intended by management.
• The initial estimate of the costs of dismantling and removing the item and restoring the site on
which it is located.
The Council does not capitalise borrowing costs incurred while assets are under construction.

Page 79

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 68 
The cost of assets acquired other than by purchase is deemed to be its fair value, unless the acquisition
will not increase the cash flows of the Council. In the latter case, the cost of the acquisition is the carrying
amount of the asset given up by the Council.
Donated assets are measured initially at fair value. The difference between fair value and any
consideration paid is credited to the Taxation and Non-Specific Grant Income line of the Comprehensive
Income and Expenditure Statement, unless the donation has been made conditionally. Until conditions
are satisfied, the gain is held in the Donated Assets Accounts. Where gains are credited to the
Comprehensive Income and Expenditure Statement, they are reversed out of the General Fund Balance
to the Capital Adjustment Account in the Movement in Reserves Statement.
Assets are then carried in the Balance Sheet using the following measurement bases:
• Infrastructure, community assets and assets under construction – depreciated historical cost.
• Council offices – current value, determined as the amount that would be paid for the asset in its
existing use (existing use value – EUV).
• School buildings – current value, but because of their specialist nature, are measured at
depreciated replacement cost which is used as an estimate of current value.
• Surplus assets – the current value measurement base is fair value, estimated at highest and
best use from a market participant’s perspective.
• All other assets – current value, determined as the amount that would be paid for the asset in
its existing use (existing use value – EUV).
Where there is no market-based evidence of current value because of the specialist nature of an asset,
depreciated replacement cost (DRC) is used as an estimate of current value.
Where non-property assets have short useful lives or low values (or both), depreciated historical cost is
used as a proxy for current value.
Assets included in the Balance Sheet at current value are revalued sufficiently regularly to ensure that
their carrying amount is not materially different from their current value at the year-end, but as a minimum
every five years. Increases in valuations are matched by credits to the Revaluation Reserve to recognise
unrealised gains. Exceptionally, gains might be credited to the Surplus or Deficit on the Provision of
Services where they arise from the reversal of an impairment loss previously charged to a service.
Where decreases in value are identified, they are accounted for by:
• Where there is a balance of revaluation gains for the asset in the Revaluation Reserve, the
carrying amount of the asset is written down against that balance (up to the amount of the
accumulated gains).
• Where there is no balance in the Revaluation Reserve or an insufficient balance, the carrying
amount of the asset is written down against the relevant service line(s) in the Comprehensive
Income and Expenditure Statement.
The Revaluation Reserve contains revaluation gains recognised since 1 April 2007, the date of its formal
implementation. Gains arising before that date have been consolidated into the Capital Adjustment
Account.
1.19.3 Impairment
Assets are assessed at each year-end as to whether there is any indication that an asset may be
impaired. Where indications exist and any possible differences are estimated to be material, the
recoverable amount of the asset is estimated and, where this is less than the carrying amount of the
asset, an impairment loss is recognised for the shortfall.
Where impairment losses are identified, they are accounted for by:

Page 80

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 69 
• Where there is a balance of revaluation gains for the asset in the Revaluation Reserve, the
carrying amount of the asset is written down against that balance (up to the amount of the
accumulated gains)
• Where there is no balance in the Revaluation Reserve or an insufficient balance, the carrying
amount of the asset is written down against the relevant service lines in the Comprehensive
Income and Expenditure Statement.
Where an impairment loss is reversed subsequently, the reversal is credited to the relevant service lines
in the Comprehensive Income and Expenditure Statement, up to the amount of the original loss, adjusted
for depreciation that would have been charged if the loss had not been recognised.
1.19.4 Disposals and Non-current Assets Held for Sale
When it becomes probable that the carrying amount of an asset will be recovered principally through a
sale transaction rather than through its continuing use, it is reclassified as an Asset Held for Sale. The
asset is re-valued immediately before reclassification and then carried at the lower of this amount and
fair value less costs to sell. Where there is a subsequent decrease to fair value less costs to sell, the
loss is posted to the Other Operating Expenditure line in the Comprehensive Income and Expenditure
Statement. Gains in fair value are recognised only up to the amount of any previous losses recognised
in the Surplus or Deficit on the Provision of Services. Depreciation is not charged on Assets Held for
Sale.
Assets that are to be abandoned or scrapped are not reclassified as Assets Held for Sale.
When an asset is disposed of or decommissioned, the carrying amount of the asset in the Balance Sheet
(whether Property, Plant and Equipment or Assets Held for Sale) is written off to the Other Operating
Expenditure line in the Comprehensive Income and Expenditure Statement as part of the gain or loss on
disposal. Receipts from disposals (if any) are credited to the same line in the Comprehensive Income
and Expenditure Statement also as part of the gain or loss on disposal (i.e. netted off against the carrying
value of the asset at the time of disposal). Any revaluation gains accumulated for the asset in the
Revaluation Reserve are transferred to the Capital Adjustment Account.
Disposal receipts are categorised as capital receipts. All capital receipts are credited to the Capital
Receipts Reserve, and can then only be used for new capital investment. Receipts are appropriated to
the Reserve from the General Fund Balance in the Movement in Reserves Statement.
The written-off value of disposals is not a charge against Council Tax, as the cost of non-current assets
is fully provided for under separate arrangements for capital financing. Amounts are appropriated to the
Capital Adjustment Account from the General Fund Balance in the Movement in Reserves Statement.
1.19.5 Depreciation
Depreciation is provided for on all Property, Plant and Equipment assets by the systematic allocation of
their depreciable amounts over their useful lives. An exception is made for assets without a determinable
finite useful life (i.e. land and certain community assets) and assets that are not yet available for use
(i.e. assets under construction).
Where an asset has major components whose cost is significant in relation to the total cost of the item,
the components are depreciated separately.
Revaluation gains are also depreciated, with an amount equal to the difference between current value
depreciation charged on assets and the depreciation that would have been chargeable based on their
historical cost being transferred each year from the Revaluation Reserve to the Capital Adjustment
Account.
1.20 Private Finance Initiative (PFI) and Similar Contracts
PFI contracts are agreements to receive services, where the responsibility for making available the
property, plant and equipment needed to provide the services passes to the PFI contractor. As the
Council is deemed to control the services that are provided under its PFI schemes and as ownership of

Page 81

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 70 
the property, plant and equipment will pass to the Council at the end of the contracts for no additional
charge, the Council carries the assets used under the contracts on the Balance Sheet.
The original recognition of these assets at fair value was balanced by the recognition of a liability for
amounts due to the scheme operator to pay for the capital investment.
Non-current assets recognised on the Balance Sheet are revalued and depreciated in the same way as
Property, Plant and Equipment owned by the Council.
The amounts payable to the PFI operators each year are analysed into five elements:
• Fair value of the services received during the year - debited to the relevant service in the
Comprehensive Income and Expenditure Statement.
• Finance Cost – this is calculated by applying the implicit interest rate in the lease to the
opening lease liability for the period, this is debited to the Financing and Investment Income
and Expenditure line in the Comprehensive Income and Expenditure Statement.
• Contingent rent – increases in the amount to be paid for the property arising during the
contract, debited to the Financing and Investment Income and Expenditure line in the
Comprehensive Income and Expenditure Statement.
• Payment towards liability – applied to write down the Balance Sheet liability towards the PFI
operator (the profile of write-downs is calculated using the same principles as for a finance
lease).
• Lifecycle replacement costs – proportion of the amounts payable is posted to the Balance
Sheet as a prepayment and then recognised as additions to Property, Plant and Equipment
when the relevant works are eventually carried out.
1.21 Provisions and Contingent Liabilities 
1.21.1 Provisions
Provisions are made where an event has taken place that gives the Council a legal or constructive
obligation that probably requires settlement by a transfer of economic benefits or service potential, and
a reliable estimate can be made of the amount of the obligation. For instance, the Council may be
involved in a court case that could eventually result in a settlement or the payment of compensation.
Provisions are charged as an expense to the appropriate service line in the Comprehensive Income and
Expenditure Statement in the year that the Council becomes aware of the obligation, and measured at
the best estimate at the Balance Sheet date of the expenditure required to settle the obligation, taking
into account relevant risks and uncertainties.
When payments are eventually made, they are charged to the provision set up in the Balance Sheet.
Estimated settlements are reviewed at the end of each financial year and where it becomes more likely
than not that a transfer of economic benefits will not now be required (or a lower settlement than
anticipated is made), the provision is reversed and credited back to the relevant service.
Where some or all of the payment required to settle a provision is expected to be recovered from another
party (e.g. from an insurance claim), this is only recognised as income for the relevant service if it is
virtually certain that reimbursement will be received if the obligation is settled.
1.21.2 Contingent Liabilities
A contingent liability arises where an event has taken place that gives the Council a possible obligation
whose existence will only be confirmed by the occurrence or otherwise of uncertain future events not
wholly within the control of the Council. Contingent liabilities also arise in circumstances where a
provision would otherwise be made but either it is not probable that an outflow of resources will be
required or the amount of the obligation cannot be measured reliably.
Contingent liabilities are not recognised in the Balance Sheet but disclosed in a note to the accounts.

Page 82

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 71 
1.22 Reserves
Reserves are created by appropriating amounts out of the General Fund Balance in the Movement in
Reserves Statement. When expenditure to be financed from a reserve is incurred, it is charged to the
appropriate service in that year to score against the Surplus/Deficit on the Provision of Services in the
Comprehensive Income and Expenditure Statement. The reserve is then appropriated back into the
General Fund Balance in the Movement in Reserves Statement so that there is no net charge against
Council Tax for the expenditure.
Certain reserves are kept to manage the accounting processes for non-current assets, financial
instruments and retirement benefits and do not represent usable resources for the Council – these
reserves are explained in the relevant policies above and Note 32 to the accounts.
1.23 VAT
Income and expenditure excludes any amounts related to VAT, as all VAT collected is payable to HM
Revenue and Customs and VAT paid is recoverable.
2. ACCOUNTING STANDARDS ISSUED BUT NOT YET ADOPTED
The standards introduced by the 2024-25 Code where disclosures are required in the 2023-24 financial
statements in accordance with the requirements of paragraph 3.3.4.3 of the code are: 
• IFRS 16 Leases which is applicable from 1st April 2024. This also includes amendments in
respect of Lease Liability in a Sale and Leaseback transaction.
• IAS 1 – Classification of Liabilities as Current or Non-current and Non-current Liabilities with
Covenants.
• IAS 12 – International Tax Reform
• IAS 7 and IFRS 7 – Supplier Finance Arrangements
It is anticipated that only IFRS16 will have a material impact in future years on the Financial Statements.
There will be no material impact in future years from the adoption of these amendments in relation to
IAS 1, IAS 12 and IAS 7.
CIPFA/LASAAC has agreed to defer the implementation of IFRS 16 Leases until 1 April 2024. 
3. CRITICAL JUDGEMENTS IN APPLYING ACCOUNTING POLICIES
In applying the accounting policies set out in Note 1, the Council has had to make certain judgements
about complex transactions or those involving uncertainty about future events. Where a critical
judgement has been made this is referred to in the relevant note to the core financial statements;
however a summary of those with the most significant effect is detailed below:
• There is a high degree of uncertainty about future levels of funding for local government.
However, the Council has determined that this uncertainty is not yet sufficient to provide an
indication that the assets of the Council might be impaired as a result of a need to close facilities
and reduce levels of service provision.
• The Council currently operates three Private Finance Initiative (PFI), or similar, contracts which
are accounted for as Service Concession arrangements under IFRIC12 – Service Concession
Arrangements. The Council has determined that in the case of the Schools NPDO contract and
the new Schools DBFM contract, the Council has control over the services provided through use
of the schools and that a qualifying asset has been created. The appropriate accounting treatment
is to bring the assets “on Balance Sheet” along with a finance lease liability.
• The Council also operates a Waste Management PPP contract. In this case the Council
determined that a “qualifying asset” had not been created and that the Council did not have
significant control over the services being provided. The appropriate accounting treatment was

Page 83

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 72 
therefore determined to be “off Balance Sheet” and that payments to the contractor are charged
to the appropriate service line within the Comprehensive Income and Expenditure Account.
• The Council has considered its exposure to possible losses and made adequate provision where
it is probable that an outflow of resources will be required and the amount of the obligation can
be measured reliably. Where it has not been possible to measure the obligation, material
contingent liabilities have been disclosed in Note 34.
• Unused holiday entitlement earned at 31 March 2024 but not taken at that date has been
quantified on the basis of a 5% sample of all non-term time Council employees. The calculation
in respect of unused holidays for term time staff in schools is based on actual leave entitlement
as at 31 March and no estimation is required for these staff. The liability shown in the 2023-24
financial statements in respect of the holiday pay accrual is £8.272m.
4. ASSUMPTIONS MADE ABOUT THE FUTURE AND OTHER MAJOR SOURCES OF
ESTIMATION UNCERTAINTY
The financial statements contain estimated figures that are based on assumptions made by the Council
about which there is a degree of uncertainty. Estimates are made taking into account historical
experience, current trends and other relevant factors. However, because balances cannot be
determined with certainty, actual results could be materially different from the assumptions and
estimates.
The items in the Council’s Balance Sheet at 31 March 2024 for which there is a significant risk of material
adjustment in the forthcoming financial year are outlined in the table that follows:

Page 84

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ____________________________________________________________________________________ Page 73 
Item Uncertainties Effect if Actual Results Differ from Assumptions 
Property, Plant and Equipment Assets are depreciated over useful lives that are
dependent on assumptions about the level of
repairs and maintenance that will be incurred in
relation to individual assets. The current
economic climate makes it uncertain that the
Council will be able to sustain its current spending
on repairs and maintenance, bringing into doubt
the useful lives.
If the useful life of assets is reduced, depreciation increases and the
carrying amount of the assets falls.
It is estimated that the annual depreciation charge for buildings would
increase by £1.142m for every year that useful lives had to be reduced.
Rolling Programme Valuation The Council employs professional valuers who
are registered with the Royal Institution of
Chartered Surveyors. These valuers carry out
regular reviews of the assets reported in the
Balance Sheet and any significant changes in
value are processed as an asset revaluation or
impairment. These valuations are based on their
professional opinion using available market
information at the time of assessment. Due to the
high number of assets, a rolling programme of
asset valuations has been established for many
years, with the aim of revaluing one fifth of the
portfolio each financial year which is made up of
various asset types. This is in addition to those
assets which are valued annually; Surplus
Assets, Investment Properties, Held for Sale
assets and those where capital spend has
exceeded £0.1m in the current year.
This carries inherent risk that assets not revalued in-year have been
subject to material changes in value particularly if affected by external
factors such as inflation. 
The highest risk in this respect relates to assets valued using the
depreciated Replacement Cost (DRC) method, which for Argyll & Bute
Council includes schools. To mitigate this risk, a desktop assessment
was undertaken for 2023-24 to estimate the potential increase in value
of our assets valued using depreciated replacement cost using BCIS
indices. As the BCIS indices have not increased materially, the impact
on these assets was not deemed to be material so no adjustment was
made. 
Consideration will be given on an annual basis to those assets which
may have material impairment.

Page 85

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ____________________________________________________________________________________ Page 74 
Pensions Liability Estimation of the net liability to pay pensions
depends on a number of complex judgements
relating to the discount rate used, the rate at
which salaries are projected to increase,
changes in retirement ages, mortality rates and
expected returns on pension fund assets. A firm
of consulting actuaries is engaged to provide the
Council with expert advice about the
assumptions to be applied. 
The effects on the net pension’s liability of changes in individual
assumptions can be measured. The sensitivities regarding the
principal assumptions used to measure the scheme liabilities are set
out as follows:  
Sensitivities at
31 March 2024
Approximate %
Increase to
Employer
Liability
Approximate
monetary
amount
£’000
0.1% decrease in real
discount rate 2% 10,827
1 Year increase in the member
life expectancy 4% 26,766
0.1% increase in salary
increase rate 0% 1,409
0.1% increase in pension
increase rate 2% 9,594

Page 86

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ____________________________________________________________________________________ Page 75 
5.1 EXPENDITURE AND FUNDING ANALYSIS
Net
Expenditure
Chargeable to
the General
Fund
Adjustments
between the
Funding and
Accounting
Basis        
(Note 5.2)
Net Expenditure
in the
Comprehensive
Income and
Expenditure
Statement
Net
Expenditure
Chargeable to
the General
Fund
Adjustments
between the
Funding and
Accounting
Basis       
(Note 5.2)
Net Expenditure
in the
Comprehensive
Income and
Expenditure
Statement
£'000 £'000 £'000 Service £'000 £'000 £'000
7,538             1,063             8,601                 Chief Executive and Financial Services 1,161             25                  1,186                
Executive Director Douglas Hendry
366                70                  436                   Executive Director 421                6                    427                  
10,616           18,533           29,149               Commercial Services 12,232           6,921             19,153              
95,943           (3,537)            92,406               Education 104,697          (3,775)            100,922            
9,860             1,711             11,571               Legal and Regulatory Support 12,259           1,020             13,279              
Executive Director Kirsty Flanagan
369                49                  418                   Executive Director 237                5                    242                  
-                 -                -                    Financial Services 6,885             89                  6,974                
8,139             3,046             11,185               Customer Support 9,403             2,228             11,631              
9,070             1,806             10,876               Development and Economic Growth 8,904             385                9,289                
31,855           15,628           47,480               Roads and Infrastructure 33,981           12,709           46,690              
73,976           5,510             79,486               Social Work 77,137           939                78,076              
8,226             (632)               7,594                 Other Non-Departmental Costs 11,109           (1,712)            9,397                
255,958      43,247       299,202        Net Cost of Services 278,426        18,840          297,266           
2022-23 2023-24

Page 87

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ____________________________________________________________________________________ Page 76 
(246,231)        (46,924)          (293,155)            Other Income and Expenditure (307,811)        780                (307,031)           
9,727         (3,677)        6,047            (Surplus) / Deficit (29,385)      19,620       (9,765)          
(96,081) Opening General fund Balance (86,356)
9,727             Plus (Surplus) or Deficit on General Fund Balance (29,385)         
(86,356)      Closing General Fund Balance (115,741)   
The Expenditure and Funding Analysis shows how annual expenditure is used and funded from resources (government grants, council tax and business rates)
by local authorities in comparison with those resources consumed or earned by authorities in accordance with generally accepted accounting practices. It also
shows how this expenditure is allocated for decision making purposes between the council’s services. Income and expenditure accounted for under generally
accepted accounting practices is presented more fully in the Comprehensive Income and Expenditure Statement.

Page 88

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ____________________________________________________________________________________ Page 77 
5.2 EXPENDITURE AND FUNDING ANALYSIS RECONCILIATION
This note provides a reconciliation of the main adjustments to Net Expenditure Chargeable to the General Fund to arrive at the amounts in the Comprehensive
Income and Expenditure Statement.
Adjustments for
Capital
Purposes      
Note (i)
Net change for
Pension
Adjustments
Note (ii)
Capital element
of Schools
NPDO payment         
Note (iii)
Other
Adjustments 
Note (iv)
Total
Adjustments
£'000 £'000 £'000 £'000 £'000
Chief Executive and Financial Services -                       16                    -                       9                      25
Executive Director (Douglas Hendry)
Executive Director (Douglas Hendry) -                       7                      -                       (1)                     6
Commercial Services 1,960                163                  -                       4,798                6,921
Education 3,888                443                  -                       (8,106)              (3,775)
Legal and Regulatory Support 3,387                74                    (5,232)              2,791                1,020
Executive Director (Kirsty Flanagan)
Executive Director (Kirsty Flanagan) -                       5                      -                       -                       5
Financial Services 89                    89
Head of Customer Support 1,752                129                  -                       347                  2,228
Head of Development and Economic Growth 344                  149                  -                       (108)                 385
Roads and Infrastructure 10,977              341                  -                       1,391                12,709
Social Work 806                  545                  -                       (412)                 939
Other Non-Departmental Costs -                       (1,687)              -                       (25)                   (1,712)
23,114             274                  (5,232)              684                  18,840            
Other Income and Expenditure 2,956                (6,596)              4,831                (411)                 780                 
26,070             (6,322)              (401)                 273                  19,620            
Net Cost of Services
Difference between General Fund Surplus and
Comprehensive Income and Expenditure Statement
(Surplus)/Deficit
Adjustments from General Fund to arrive at the Comprehensive
Income and Expenditure Statement amounts
Adjustments between Funding and Accounting Basis 2023-24

Page 89

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ____________________________________________________________________________________ Page 78 
(i) Adjustments for Capital Purposes
This column adds in depreciation and impairment and revaluation gains and losses in the services line, and for:
• Other operating expenditure – adjusts for capital disposals with a transfer of income on disposal of assets and the amounts written off for those
assets.
• Taxation and non-specific grant income and expenditure – capital grants are adjusted for income not chargeable under generally accepted
accounting practices. Revenue grants are adjusted from those receivable in the year to those receivable without conditions or for which conditions
were satisfied throughout the year. The Taxation and Non Specific Grant Income and Expenditure line is credited with capital grants receivable in
the year without conditions or for which conditions were satisfied in the year.
• Financing and investment income and expenditure – the statutory charges for capital financing (loans fund advances) and other revenue
contributions are deducted from other income and expenditure as these are not chargeable under generally accepted accounting practices.
(ii) Net change for the Pensions Adjustments
Net change for the removal of pension contributions and the addition of IAS 19 Employee Benefits pension related expenditure and income:
• For services this represents the removal of the employer pension contributions made by the Council as allowed by statute and the replacement with
current service costs and past service costs.
• For Financing and investment income and expenditure – the net interest on the defined benefit liability is charged to the Comprehensive Income
and Expenditure Statement.
(iii) Capital element of schools NPDO payment
• This is the capital cost of the annual payment to the schools NPDO operator and represents repayment of the Balance Sheet liability rather than a
charge to Comprehensive Income and Expenditure Statement.
(iv) Other Adjustments
• For Financing and investment income and expenditure the other differences column recognises adjustments to the General Fund for the timing
differences for premiums and discounts.
• For services an adjustment is made for the accrual of holiday pay and other similar entitlements, this is required under generally accepted accounting
principles but the impact on the General Fund is mitigated by statute which allows the impact to be reversed out through the Movement in Reserves
Statement.

Page 90

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ____________________________________________________________________________________ Page 79 
6 GENERAL FUND RESERVES
The Council has ring-fenced £107.443m of the balance on the General Fund.
Ring-fenced Balances
Balance                    
1 April 2023 Funds Used
Contributions
to/from
Funds
New
Earmarking
agreed     
2023-24
New
Earmarking
at end of
2023-24
Balance                   
31 March
2024
£'000 £'000 £'000 £'000 £'000 £'000
Strategic Housing Fund (Revenue from Additional Council Tax
on Second Homes) 7,247            (1,057)           2,575            8,765         
Investment in Affordable Housing 3,163            (139)             3,024         
Capital Projects 16,059          (12,379)         2,327            2,509            29,442          37,958       
Lochgilphead and Tarbert Regeneration 1,460            (410)             1,050         
Support for Rural Growth Deal 756               (215)             541           
Asset Management 2,098            (28)               (2,070)           -            
Piers and Harbours Investment Fund 2,789            1,336            4,125         
Scottish Government Initiatives 2,834            (1,274)           1,219            2,779         
CHORD 378               (89)               120               409           
Devolved School Management Scheme (DSM) 1,394            (1,300)           645               739           
Energy Efficiency Fund 218               20                238           
Unspent Budget Required for Existing Legal Commitments 476               (476)             -            
Unspent Third Party Contributions 13,179          (5,937)           5,016            3,528            15,786       
Contributions Carried Forward 265               (44)               233               454           
Other Previous Council Decisions 3,808            (513)             845               4,140         
Redundancy Reserve 1,578            (115)             1,500            2,963         
Connect for Success Fund 1,426            (745)             681           
One Council Property 566               (566)             -            
Fleet - Timing Delay 658               (174)             484           
Hermitage Park 19                37                56             
Electric Vehicle Chargers 17                (17)               -            
Priorities Investment Fund -               4,742            4,742         
COVID-19 5,512            -               (5,512)           -            
Unspent Budget Carried Forward 13,566          (2,989)           (931)             173               8,690            18,509       
Total Ring-fenced 79,466          (27,286)         (2,351)           2,682            54,932          107,443     
Contingency 5,691                             -  348                                -  6,039         
Unallocated 1,199                             -  1,530            (470)                              -  2,259         
Total General Fund Balance 86,356          (27,286)         (473)             2,212            54,932          115,741      
The contingency balance of £6.039m is 2% of the Council’s budgeted net expenditure for 2023-24.

Page 91

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ____________________________________________________________________________________ Page 80 
6.1   Service Concessions   
During 2022/23 the Scottish Government announced revised regulations in relation to the treatment of service concessions: Local government
finance circular 10/2022 - finance leases and service concession arrangements. The council currently operates two service concessions in relation
to its Public Private Partnerships (PPP) and Design, Build, Finance, Maintain (DBFM) arrangements both within Education. 
The revised regulations allow for the debt costs associated with these schemes to be written off over the expected lives of the respective assets
rather than over the contract period of each arrangement. This ensures repayments are aligned to the period over which benefit flows from the asset
and provides scope to realign debt costs to reflect the asset lives.   
The cumulative value of the liability charged to the General Fund prior to applying the permitted flexibility was £43.376m up to and including the
financial year 2023-24. After applying the permitted flexibility,there is a one-off historical debt cost saving of £36.038m and in year savings of
£4.831m resulting in an overall benefit in 2023-24 of £40.869m.
This saving has been earmarked for specific council priorities and has been included in note 6 above.

Page 92

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ____________________________________________________________________________________ Page 81 
7 SUPPLEMENTARY NOTES TO THE STATEMENT OF COMPREHENSIVE INCOME AND EXPENDITURE
7.1 Expenditure and Income Analysed by Nature
Council’s expenditure and income is analysed as follows: 
2022-23 Expenditure/Income 2023-24
£'000 £'000
Expenditure
196,213 Employee benefits expenses 195,129
178,016 Other services expenses 189,024
74,391 Contribution to Argyll and Bute Integration Joint Board 77,604
27,828 Depreciation, amortisation, impairment 23,113
10,655 Interest payments 7,441
1,253 Precepts and levies 1,254
390 Other operating expenditure 416
(437) Net Loss/(Gain) on the disposal of assets (262)
488,309 Total Expenditure 493,719
Income
(102,855) Fees, charges and other service income (109,999)
(74,391) Income to fund social care services (Argyll and Bute Integration Joint Board) (77,604)
(2,966) Interest and investment income (4,779)
(87,726) Income from council tax and non-domestic rates (100,358)
(214,324) Government grants and contributions (210,743)
(482,262) Total Income (503,483)
6,047 (Surplus)Deficit on the Provision of Services (9,764)

Page 93

Notes to the Financial Statements 
www.argyll-bute.gov.uk   _________________________________________________ Page 82 
7.2 Revenue from Contracts with Service Recipients
31 March
2023
31 March
2024
£'000 £'000
32,900   34,201       
32,900  34,201      
Revenue from contracts with service recipients
Total Included in Comprehensive Income and
Expenditure Statement 
8 OTHER OPERATING INCOME AND EXPENDITURE
The expenditure of £1.669m shown in the Other Operating Income and Expenditure line on the
Statement of Comprehensive Income and Expenditure can be analysed as follows:
2022-23 2023-24
Actual Other Operating Income and Expenditure Actual
£'000 £'000
1,253          Dunbartonshire and Argyll & Bute Valuation Joint Board Requisition 1,254           
(20)             Equal Pay Settlements and Legal Costs -              
410             Other Operating Income and Expenditure not attributable to Services 416              
1,643 Total 1,670             
9 AGENCY SERVICES
The Council bills and collects non-domestic rates on behalf of the Scottish Government from ratepayers
situated within Argyll and Bute. The Council also bills and collects, along with its own council tax,
domestic water and sewerage charges on behalf of Scottish Water. In addition, the Council received
funding from the UK Government to help people who met the Government’s eligibility criteria to pay their
home energy bills. The Council had no discretion over the terms of the funding and could not use it for
service delivery. This means the Council acted as agent only and the grant funding received and paid
out are not included in the Council's reserves, CIES or Balance Sheet. In some cases, an administration
grant was awarded to the Council to facilitate these payments. This is accounted for as operational
income and expenditure and not disclosed here.

Page 94

Notes to the Financial Statements 
www.argyll-bute.gov.uk   _________________________________________________ Page 83 
2022-23 2023-24
Actual Actual
£'000 £'000
33,179 Scottish Government - Contributions (to)/from the non-domestic rates pool 37,645
15,106 Domestic water and sewarage charges collected 15,830
(15,106) Domestic water and sewarage charges paid over to Scottish Water (15,830)
265 Service income from Scottish Water for collection of domestic water and sewerage 367
7 Service income BID levy - Dunoon 8
7 Service income BID levy - Oban 7
7 Service income BID levy - Bute 7
(714) Scottish Child Payment - amount paid out -
714 Scottish Child Payment - amount received from the Scottish Government -
(73) BIES Energy Grant - amount paid out (373)
73 BIES Energy Grant - amount received from the Scottish Government 373
(167) COVID - Financial Hardship and Self-Isolation grants paid out -
167 COVID - Financial Hardship and Self-Isolation funding received from Scottish Government -
33,465 Total 38,034
Agency Income
10 COMMUNITY CARE AND HEALTH (SCOTLAND) ACT 2002
From 1 April 2016 health and social care services were fully integrated as part of the new Health and
Social Care Partnership.
During 2023-24 the Partnership included provision of services to older people, supporting people with a
learning disability and provision of support to adults who have a mental health difficulty.
Budgets are currently aligned which means that each Partner organisation holds their own element of
the budget and records the income and expenditure that relates to the part of the service for which they
are responsible.
During 2023-24 income received by the Council from this source amounted to £7.811m and the related
expenditure was £10.953m. This can be analysed as follows: 
Income Expenditure Income Expenditure
£'000 £'000 Purpose of Services £'000 £'000
3,300 5,402 Care of the Elderly 3,464            5,658         
2,914 3,615 Provision of Services for People with Learning Disabilities 2,945            3,787         
1,380 1,527 Provision of Services for People with Mental Health Needs 1,402            1,508         
7,594 10,544 7,811            10,953        
833 833
8,427 11,377 TOTAL 7,811            10,953        
Additional Covid Response Funding received via NHS for
2022-23
2022-23 2023-24

Page 95

Notes to the Financial Statements 
www.argyll-bute.gov.uk   _________________________________________________ Page 84 
11 FEES PAYABLE TO EXTERNAL AUDITORS 
In 2023-24 the following fees relating to external audit and inspection were incurred alongside comparative
figures for 2022-23: 
2022-23 2023-24
£'000 £'000
310 Fees payable to External Auditors with regard to external audit services carried 325
out by the appointed Auditor
310 Total Remuneration 325
Auditor's Remuneration
The figure above excludes fees for the audit of the Council’s charitable trusts. 
Forvis Mazars did not undertake any non-audit work in 2022-23 or 2023-24. 
12 WASTE MANAGEMENT PUBLIC PRIVATE PARTNERSHIP
The Council has entered into a Public Private Partnership for the provision of its waste disposal service.
This agreement requires the provider to upgrade or replace three waste disposal sites, two transfer
stations and five civic amenity sites. In addition, the provider will also provide composting facilities to
meet waste diversion targets. When the agreement ends in September 2026, during financial year 2026-
27, the provider will hand back to the Council the waste disposal facilities with a remaining life of 5 years.
The Council has paid a service charge of £7.268m which represents the value of the service provided
from 1 April 2023 to 31 March 2024 (£6.514m for 2022-23). Under the agreement the Council is
committed to paying the following sums: 
Future Repayment Periods £'000
2024-2025 6,956
2025-2026 7,108
2026-2027 2,336
Total 16,400 
The average service charge equates to £5.180m per annum over the life of the contract.

Page 96

Notes to the Financial Statements 
www.argyll-bute.gov.uk   _________________________________________________ Page 85 
13 GRANT INCOME
The Council credited the following grants to the Comprehensive Income and Expenditure Statement:
2022-23 Grant Income 2023-24
£'000 £'000
Credited to Taxation and Non Specific Grant Income
191,265 Revenue Support Grant 187,193
33,179 Non Domestic Rates 37,645
344 Specific Capital Grant 96
19,187 General Capital Grant 22,347
44 Heritage Lottery Fund -
728 Scottish Timber Transport Strategy 791
1,353 Scottish Government -
90 Strathclyde Partnership for Transport (SPT) 90
55 Revenue Contribution to Capital Projects 100
748 Other Grants 126
246,993 Total 248,388
Credited to Services
12,869 Scottish Government Specific Grants 12,555
809 General Capital Grant - Private Sector Housing Improvement Grants 855
16,581 Housing Benefit Subsidy 16,443
14,787 Other Revenue Government Grants 21,243
45,046 Total 51,096

Page 97

Notes to the Financial Statements 
www.argyll-bute.gov.uk   _________________________________________________ Page 86 
14 RELATED PARTIES
The Council is required to disclose material transactions with related parties – bodies or individuals that
have the potential to control or influence the Council or to be controlled or influenced by the Council.
Disclosure of these transactions allows readers to assess the extent to which the Council might have
been constrained in its ability to operate independently or might have secured the ability to limit another
party’s ability to bargain freely with the Council.
The aim of the Financial Reporting Standard dealing with Related Parties is to highlight instances where
influence and control has been exercised over an external organisation by the Council, and where an
elected member, their close family or someone in their household, has the ability to exercise the
influence or control. Elected members and Senior Officers have completed a signed declaration on
Related Party Interests and these have been used to compile this disclosure.
14.1 Scottish Government
The Scottish Government has effective control over the general operations of the Council – it is
responsible for providing the statutory framework, within which the Council operates, provides the
majority of its funding in the form of grants and prescribes the terms of many of the transactions that the
Council has with other parties (e.g. council tax bills, housing benefits). Grants received from government
departments are set out in Note 13 – Grant Income. 
14.2   Members
Members of the council have direct control over the Council’s financial and operating policies. The total
of members’ allowances paid in 2023-24 is shown in the Remuneration Report.
During the year there were two organisations in which members had a significant interest and where the
total of transactions exceeded £10,000. 
2022-23
Expenditure
2023-24
Expenditure
£'000 Transactions in which Members have a significant interest £'000
21 Argyll and Bute Rape Crisis 0
81 S & C Crawford Building Contractors Ltd 337
69 Bookfan Ltd Trading as South Peak Services 81
171 Total 418

Page 98

Notes to the Financial Statements 
www.argyll-bute.gov.uk   _________________________________________________ Page 87 
14.3 Other Related Bodies
This category relates to transactions with entities which are controlled or significantly influenced by the
Council.
During the year transactions with other related bodies were as follows:
2022-23
Expenditure
2023-24
Expenditure
£'000 Related Bodies £'000
4,197 Transactions with related bodies during the year totalled 4,418
Of these, transactions with the following exceeded £10,000:
210 ACHA 48
579 Dunbritton Housing Association Limited 590
34 LINK Group Ltd 30
96 West Highland Housing Association Ltd 312
14 Fyne Homes 26
548 Oban and Lorn Community Enterprise - Atlantis Leisure 606
100 Islay and Jura Community Enterprise 141
70 Mid Argyll Community Enterprise 110
73 Scotland Excel 65
97 Argyll and Bute Citizens Advice Bureaux 55
227 Bute Advice 182
- Kintyre Recycling 10
92 SEEMIS 104
178 Argyll and the Isles Coast & Countryside Trust 200
411 Carr Gomm 429
127 Argyll & Bute Women's Aid 132
241 Argyll & Bute Care & Repair 252
161 HELP 168
97 COSLA 71
411 Strathclyde Passenger Transport 416
204 Strathclyde Concessionary Travel Scheme 209
60 Glengorm Partnership -
- Group Recycling in Argyll & Bute (GRAB) 73
91 North West Mull Community Woodland Company -
41 Mull & Iona Community Trust (MICT) 148
4,162           Total 4,377           
Given the relationships the Council has with other organisations and partners it is possible that some
related party transactions may exist. However, the purpose of the requirement to complete the disclosure
is to provide additional information to the users of the Annual Accounts and, by declaring possible
instances, there is no suggestion that any inappropriate transactions have taken place. 
Please refer to Group Accounts on pages 128 to 139.

Page 99

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ___________________________________________________________________________________ Page 88 
15 PROPERTY, PLANT AND EQUIPMENT
15.1 Movement in Property, Plant and Equipment 
Other Land
& Buildings
Vehicles
Plant &
Equipment
Community
Assets
Surplus
Assets
Assets Under
Construction
Total
2023-24
Infrastructure
Assets
£'000 £'000 £'000 £'000 £'000 £'000 £'000
Cost or Valuation
At 1 April 2023 453,644     46,440       8,901          3,283         21,440         533,708    
Additions 8,483         3,177         218             (18)            15,117         26,977       12,309          
Additions financed under a new leasing arrangement -               
5,217         653           5,870        
813           69             882           
Derecognition - Disposals (1,552)       (1,552)       
Assets reclassified (to)/from Held for Sale (539)          630           91             
Other movements in cost or valuation (833)             (833)           833               
At 31 March 2024 467,618     48,065       9,119          4,617         35,724         565,143    
Depreciation and Impairments
At 1 April 2023 (2,626)       (35,568)      (9)               3               -                  (38,200)     
(13,802)      (3,037)       (16,839)      (8,846)           
4,125         16             4,141        
2,037         2,037        
-               
-               
1,552         1,552        
Derecognition - Other 17             (16)            1              
-               
At 31 March 2024 (10,249)     (37,053)     (9)               3               -                  (47,308)    
Balance Sheet amount at 31 March 2024 457,369    11,012      9,110         4,620        35,724        517,835    239,372       
Balance Sheet amount at 31 March 2023 451,018    10,872      8,892         3,286        21,440        495,508    235,076       
Movements in 2023-24
Revaluation increases/(decreases) recognised in the Revaluation
Reserve
Revaluation increases/(decreases) recognised in the
Surplus/Deficit on the Provision of Services
Depreciation Charge for 2023-24
Depreciation written out to the Revaluation Reserve
Depreciation written out to the Surplus/Deficit on the Provision of
Services
Impairment losses/(reversals) recognised in the Revaluation
Reserve
Impairment losses/(reversals) recognised in the Surplus/Deficit on
the Provision of Services
Derecognition - Disposals
Other movements in depreciation and impairment

Page 100

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ___________________________________________________________________________________ Page 89 
Other Land
& Buildings
Vehicles
Plant &
Equipment
Community
Assets
Surplus
Assets
Assets Under
Construction
Total
2022-23
Infrastructure
Assets
£'000 £'000 £'000 £'000 £'000 £'000 £'000
Cost or Valuation
At 1 April 2022 428,437     44,428       7,463          1,405         35,344         517,077    
Additions 8,671         2,024         1,438          283           10,212         22,628       13,110          
Additions financed under a new leasing agreement -                -                -                 - -                  -               
2,499         1,237         3,736        
(8,252)       (18)            -                  (8,270)       
Derecognition - Disposals (1,451)       (12)            -                (1,463)        g                 
Assets reclassified (to)/from Held for Sale (376)          376           -               
Other movements in cost or valuation 24,116       -                -                (24,116)        -               
At 31 March 2023 453,644     46,440       8,901          3,283         21,440         533,708    
Depreciation and Impairments
At 1 April 2022 (13,585)      (32,630)      (9)               3               -                  (46,221)     
(13,068)      (2,944)       (16,012)      (8,512)           
17,284       17,284      
5,300         5,300        
1,443         6               1,449        
-                -               
At 31 March 2023 (2,626)       (35,568)     (9)               3               -                  (38,200)    
Balance Sheet amount at 31 March 2023 451,018    10,872      8,892         3,286        21,440        495,508    235,076       
Balance Sheet amount at 31 March 2022 414,852    11,798      7,454         1,408        35,344        470,856    230,478       
Comparative Movements in 2022-23
Revaluation increases/(decreases) recognised in the Revaluation
Reserve
Revaluation increases/(decreases) recognised in the
Surplus/Deficit on the Provision of Services
Depreciation Charge for 2022-23
Depreciation written out to the Revaluation Reserve
Other movements in depreciation and impairment
Impairment losses/(reversals) recognised in the Surplus/Deficit on
the Provision of Services
Derecognition - Disposals

Page 101

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ___________________________________________________________________________________ Page 90 
As permitted by Finance Circular 09-2022 the council has adopted both Statutory Override 1 & 2 relating to infrastructure assets which allow for the following; 
Statutory Override 1: For accounting periods commencing from 1 April 2021 until 31 March 2024 a local authority is not required to report the gross cost and
accumulated depreciation for infrastructure assets. 
Statutory Override 2: For accounting periods commencing 1 April 2010 until 31 March 2024 the carrying amount to be derecognised in respect of a replaced
part of an infrastructure asset is to be taken and accounted for as a nil amount. No subsequent adjustment shall be made to the carrying amount of the asset
with respect to that part.

Page 102

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 91 
15.2 Valuation of Property, Plant and Equipment
IAS 16 – Property, Plant and Equipment has been adapted for the public sector by IPSAS 17 – Property,
Plant and Equipment. Under IPSAS 17 each category of Property, Plant and Equipment is valued as
follows:
• Infrastructure, community assets and assets under construction are valued at historical cost.
• Vehicles, plant and equipment are valued at depreciated historical cost as a proxy for fair value.
• All other classes of assets are valued at fair value. Where there is no market based evidence of
fair value because of the specialist nature of the asset and the asset is rarely sold then an estimate
of fair value is made using a depreciated replacement cost approach.
The Council carries out a rolling programme that ensures that all Property, Plant and Equipment required
to be measured is re-valued at least every five years. 
Assets identified as Corporate Surplus Assets are valued in accordance with IFRS 13 - Fair Value
Measurement. The Balance Sheet value of Corporate Surplus assets at 31 March 2024 was £4.620m.
Corporate Surplus assets are valued at their fair value on 31 March each year. Level 2 or 3 inputs were
used for most Corporate Surplus asset valuations. 
Revaluations of Council owned land and property were carried out at 31 March 2024 in accordance with
the Council’s rolling programme of revaluations. The revaluations have been carried out in house by the
Council’s Estates Service. Valuations of land and buildings were carried out in accordance with the
methodologies and basis for estimation set out in the professional standards of the Royal Institution of
Chartered Surveyors. For assets not valued in-year a desktop assessment was undertaken for 2023-24 to
estimate the potential increase in value of those assets valued using depreciated replacement cost using
BCIS indices. As the BCIS indices have not increased materially, the impact on these assets was not
deemed to be material so no adjustment was made. 
The following table shows the progress of the Council’s rolling programme for the revaluation of Other
Land and Buildings: 
Estates
Valuation
Desktop
Valuation
Current
Valuation
£'000 £'000 £'000
31 March 2024 135,773     135,773      
31 March 2023 179,234     5,007         184,241      
31 March 2022 38,954       3,335         42,289       
31 March 2021 50,140       3,164         53,304       
31 March 2020 39,207       2,555         41,762       
Total Cost or Valuation 443,308    14,061      457,369    
Other Land & BuildingsValued at Fair Value as at:

Page 103

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 92 
15.3  Depreciation
The following useful lives and depreciation rates have been used in the calculation of depreciation:
•  Buildings – straight-line allocation over the useful life of the property as estimated by the valuer
(20 to 60 years)
•  Infrastructure – straight-line allocation over 40 – 60 years
•  Vessels – straight line allocation over 25 years
•  Vehicles, Plant and Equipment - straight-line allocation over the useful life of the asset as
determined by a suitably qualified officer (5 to 20 years) 
15.4  Summary of Capital Expenditure and Financing
Capital expenditure involves the creation of assets, the benefit of which will be available to future rates
and Council taxpayers. It is financed from borrowing, capital receipts and capital grants. The cost of
the asset is effectively borne over a period of years. In 2023-24 total spending on capital projects was
£40.094m. 
2022-23 2023-24
£'000 £'000
307,100           Opening Capital Financing Requirement 291,782      
Capital Investment:
8,543                Property Plant and Equipment: Other Land and Buildings 8,483           
2,024                Vehicles, Plant, Furniture and Equipment 3,177           
13,110              Infrastructure Assets 12,309         
1,438                Community Assets 218              
283                   Surplus Assets (18)              
10,212              Assets Under Construction 15,117         
128                  
Property Plant and Equipment
acquired under Finance Leases: Other Land and Buildings - DBFM Schools -                  
246                   Heritage Assets 224              
174                   Intangible Assets 202              
12                    Investment Assets 382              
Assets Held for Sale
36,170             Total Capital Investment 40,094        
Sources of Finance:
-                       Capital Receipts -                  
(22,549)             Government Grants (23,550)        
(2,938)               Capital Financed from Current Revenue (1,616)          
(4,276)               Net Borrowing (6,111)          
(16,041)             Earmarked Reserves (1,532)          
(5,116)               Assets Aquired under Finance Leases/Schools NPDO (5,280)          
(568)                 Capital Receipts transferred to/(from) Capital Fund (2,207)          
-                       Service Concessions 40,869         
-                       Other (55)              
(51,488)            Total Funding 518             
291,782           Closing Capital Financing Requirement 332,394

Page 104

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 93 
15.5 Commitments under Capital Contracts
At 31 March 2024, the Council had commitments on capital contracts of £6.236m. This expenditure will
be funded from a combination of Government Grants, borrowing and income from selling assets and
contributions from Revenue Accounts. Similar commitments at 31 March 2023 were £13.745m. The
major commitments are:
Commitments Under Capital Contracts 2023-24
£'000
Tigh-A-Rudha Care Home - Internal Upgrade 1,859       
Kilmory Business Park 979          
Lochgilphead Community Education Centre 513          
The Moat Centre - Electrical Upgrade 473          
St Andrews Primary School - Window Upgrade 358          
Port Charlotte Primary School - Electrical Works 306          
Riverside Leisure Centre - Health Suite Upgrade 280          
Helensburgh and Lomond Civic Centre - Occupation Certificate Work 267          
Dalmally Primary School - Internal Upgrade 193          
North Bute Primary School - Staff Toilet Alterations 150          
Other projects each less than £0.150m in value 858          
Total Capital Commitments 6,236       
16 HERITAGE ASSETS
The main heritage assets held by the Council are two art collections, an archaeology collection and
Inveraray Jail and Courthouse. The Council holds other heritage assets which are not valued and shown
on the Balance Sheet. Further details on the council’s heritage assets policy can be found in note 1.11. 
Reconciliation of the carrying value of heritage assets held by the Council: 
Art
Collections
Heritage
Property Total
£'000 £'000 £'000
Cost or Valuation
Net Book Value at 1 April 2023 1,600         745            2,345        
Additions -                224            224           
Disposals -                - -               
Revaluations -                - -               
Impairment Losses/(Reversals) recognised in the Revaluation Reserve -                -                -               
-                -                -               
At 31 March 2024 1,600        969           2,569       
Movements in 2023-24
Transfer from Assets Under Construction

Page 105

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 94 
17 INTANGIBLE ASSETS
Intangible assets comprise software licences and carbon reduction commitment allowances purchased
in advance. Purchased software licences are shown at cost and this cost is charged to the relevant
service lines within the Comprehensive Income and Expenditure Statement over the economic life of
the licences, assessed as five years.
The movement in intangible assets during the year was:
£'000 £'000
Cost or Valuation
At 1 April 2023 2,449              2,449             
Additions 202                 202                
Disposals -                     -                    
Revaluations -                     -                    
Reclassifications -                     -                    
At 31 March 2024 2,651             2,651            
Amortisation and Impairments
At 1 April 2023 (1,716)             (1,716)            
Charge for 2023-24 (47)                 (47)                
Disposals -                     -                    
At 31 March 2024 (1,763)            (1,763)           
Balance Sheet amount at 31 March 2024 888                888               
Balance Sheet amount at 31 March 2023 733                733               
Movements in 2023-24
Purchased
Software
Licences
Total
Intangible
Assets

Page 106

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 95 
Total
Intangible
Assets
Comparative Movements in 2022-23
£'000 £'000
Cost or Valuation
At 1 April 2022 2,275              2,275             
Additions 174                 174                
Disposals -                     -                    
Revaluations -                     -                    
Reclassifications -                    
At 31 March 2023 2,449             2,449            
Amortisation and Impairments
At 1 April 2022 (1,671)             (1,671)            
Charge for 2022-23 (45)                 (45)                
Disposals -                     -                    
At 31 March 2023 (1,716)            (1,716)           
Balance Sheet amount at 31 March 2023 733 733               
Balance Sheet amount at 31 March 2022 604                604               
Purchased
Software
Licences
18 INVESTMENT PROPERTY
Investment property has been accounted for in accordance with IAS 4 - Investment Property, except
where interpretations or adaptations to fit the public sector are detailed in the Code. The definition of an
investment property in the context of the public sector is one that is used solely to earn rentals or for
capital appreciation or both.
The value of investment property is initially measured at cost and thereafter measured at fair value. The
fair value of investment property reflects market conditions at 31 March 2024. Revaluations of
investment properties were carried out at 31 March 2024 in house by the Estates Service. 
18.1 Movement in Investment Property
The movement in investment property during 2023-24 was:
Investment
Properties
£'000
Cost or Valuation
At 1 April 2023 2,553           
Acquisitions 382              
Disposals -                  
Net Gains/Losses from fair value adjustments (42)              
Transfers (379)             
At 31 March 2024 2,514          
Movements in 2023-24

Page 107

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 96 
18.2 Investment Property Income and Expenditure
The following items of income and expenditure have been accounted for in the Financing and Investment
Income and Expenditure line in the Comprehensive Income and Expenditure Statement: 
2022-23 2023-24
£'000 £'000
141                      Rental income from investment property 144             
(4)                        Direct operating expenses arising from investment property -                  
137                 144           
19 SCHOOLS BUILT UNDER PUBLIC PRIVATE PARTNERSHIP CONTRACTS (PPP)
Argyll and Bute Council have two schemes:
Schools Non-Profit Distributing Organisation (NPDO)
During 2007-08 two secondary schools, two joint campuses and one primary campus, developed as
part of the Non-Profit Distributing Organisation (NPDO) variant of a Public Private Partnership (PPP),
became operational. When the agreement ends in 2035 the provider will hand the five school complexes
back to the Council.
Schools Hub Design, Build, Finance and Maintain Contract (DBFM)
Campbeltown and Oban High Schools have been built under this type of arrangement which reached
Financial Close in March 2016.
Campbeltown Grammar School Construction Phase 1 was completed on 19 February 2018 and
provided a new secondary school for pupils aged between 12 and 18. The new school has capacity for
500 pupils and replaces the existing Campbeltown Grammar School on the current school site at
Hutcheon Road, Campbeltown. Phase 2 which included the demolition of the existing school buildings,
provision of a car park, landscaping and 3G artificial turf pitch was completed during 2018-19.
Oban High School Construction Phase 1 was completed on 5 April 2018 and provided a new secondary
school for pupils between 12 and 18. The new school has capacity for 1300 pupils and replaces the
existing Oban High School, on the current school site at Soroba Road, Oban. Phase 2 included the
demolition of the existing school buildings, provision of a car park, landscaping and a pedestrian footway
with lighting from the new school facilities to the grass pitches owned by the Council at Glencruitten,
Oban was completed during 2018-19.

Page 108

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 97 
19.1 Assets Held under Schools NPDO and DBFM Contracts
Five schools were constructed under the Schools NPDO Contract; Hermitage Academy, Dunoon
Grammar, Lochgilphead Joint Campus, Rothesay Joint Campus and Oban Primary Campus. The
construction costs of the buildings, adjusted for revaluations on 31 March 2024 and depreciation to date
are included as part of Operational Land and Buildings.
As noted above, two schools were completed under the Schools DBFM Contract. Oban High School
and Campbeltown Grammar have been included within Operational Land & Buildings. 
Schools
DBFM - Other
Land &
Buildings
Schools
NPDO - Other
Land &
Buildings
Total
Schools Built
under PFI
Contracts
£'000 £'000 £'000
Cost or Valuation
At 1 April 2023 71,539           134,178         205,717       
Additions at Cost -                    -                    -                 
Transfers -                    -                    -                 
Revaluations 5,066             -                    5,066          
At 31 March 2024 76,605          134,178        210,783     
Depreciation and Impairments
At 1 April 2023 -                    -                    -                 
Charge for 2023-24 (2,457)           (3,355)           (5,812)         
Transfers -                    -                    -                 
Revaluations 2,457             -                    2,457          
At 31 March 2024 -                    (3,355)           (3,355)        
Balance Sheet amount at 31 March 2024 76,605          130,823        207,428     
Balance Sheet amount at 31 March 2023 71,539          134,178        205,717     
Movements in 2023-24
Schools
DBFM - Other
Land &
Buildings
Schools
NPDO - Other
Land &
Buildings
Total
Schools Built
under PFI
Contracts
£'000 £'000 £'000
Cost or Valuation
At 1 April 2022 66,018           136,962         202,980       
Additions at Cost 128               -                    128             
Transfers -                    -                    -                 
Revaluations 5,393             (2,784)           2,609          
At 31 March 2023 71,539          134,178        205,717     
Depreciation and Impairments
At 1 April 2022 -                    -                    -                 
Charge for 2022-23 (2,186)           (3,162)           (5,348)         
Transfers -                    -                    -                 
Revaluations 2,186             3,162             5,348          
At 31 March 2023 -                    -                    -                 
Balance Sheet amount at 31 March 2023 71,539          134,178        205,717     
Balance Sheet amount at 31 March 2022 66,018          136,962        202,980     
Comparative Movements in 2022-23

Page 109

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 98 
19.2 Schools NPDO Finance Lease Liability
The finance lease liability arising from the Schools NPDO and DBFM contracts are as follows: 
Schools
DBFM
Schools
NPDO
Total
Schools
Finance
Lease
Liability
£'000 £'000 £'000
Balance at 1 April 2023 (51,876)          (59,338)          (111,214)     
Additions -                    -                    -                 
Repayments 1,970             3,262             5,232          
Prior year repayment adjustment -                    -                    -                 
Schools Finance Lease
Liability at 31 March 2024 (49,906)         (56,076)         (105,982)    
Split:
Obligations payable within 1 year (1,990)           (3,298)           (5,288)         
Obligations payable after 1 year (47,916)          (52,778)          (100,694)     
Schools Finance Lease
Liability at 31 March 2024 (49,906)         (56,076)         (105,982)    
Movements in 2023-24
Schools
DBFM
Schools
NPDO
Total
Schools
Finance
Lease
Liability
£'000 £'000 £'000
Balance at 1 April 2022 (53,876)          (62,408)          (116,284)     
Additions -                    -                    -                 
Repayments 2,000             3,070             5,070          
Prior year repayment adjustment -                    -                 
Schools Finance Lease
Liability at 31 March 2023 (51,876)         (59,338)         (111,214)    
Split:
Obligations payable within 1 year (1,970)           (3,262)           (5,232)         
Obligations payable after 1 year (49,906)          (56,076)          (105,982)     
Schools Finance Lease
Liability at 31 March 2023 (51,876)         (59,338)         (111,214)    
Comparative Movements in 2022-23

Page 110

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 99 
19.3 Payments due to Operator under Schools NPDO Contract
The Council is committed to paying the following sums under the Schools NPDO contract:
Future Repayment Periods Lifecycle
Costs
Payment of
Interest
Service
Charges
Total
Payments
£'000 £'000 £'000 £'000
2024 - 2025 631               5,796             7,032           16,757     
2025 - 2029 2,593             20,035           29,716         69,220     
2029 - 2034 4,072             13,592           42,567         91,891     
2034 - 2035 318               717               4,301           9,577       
Total 7,614             40,140           83,616         187,445   
Repayment
of Liability
£'000
16,876      
31,660      
4,241        
56,075      
3,298           
19.4 Payments due to Operator under Schools DBFM Contract
The Council is committed to paying the following sums under the Schools DBFM contract: 
Future Repayment Periods Payment of
Interest
Service
Charges
Total
Payments
£'000 £'000 £'000
2024 - 2025 2,168             1,211             5,369          
2025 - 2029 7,888             4,641             20,947        
2029 - 2034 8,066             7,789             26,911        
2034 - 2039 2,471             11,773           27,817        
2039 - 2043 1,716             5,601             22,186        
Total 22,309           31,015           103,230        49,906      
Repayment
of Liability
£'000
8,418        
11,056      
1,990        
13,573      
14,869       
20 OPERATING LEASES
20.1 Operating Leases – Amounts Paid to Lessors
The Council uses land, buildings, vehicles, plant and equipment financed under the terms of an
operating lease. The amounts paid under these arrangements were as follows: 
2022-23 2023-24
£'000 £'000
552           Land and Buildings 1,223        
1,407        Vehicles 1,577        
180           Plant and Equipment 181           
2,139       Total 2,981

Page 111

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 100 
20.2 Assets Held Under Operating Leases
The Council was committed at 31 March 2024 to making payments of £2.061m under operating leases
comprising the following elements:
Other Land
and
Buildings
Vehicles,
Plant and
Equipment
Other Land
and
Buildings
Vehicles,
Plant and
Equipment
£'000 £'000 £'000 £'000
213 184 Due within 1 year 485            222           
691 162 Due between 1 and 5 years 481            114           
1,479 5 Due after 5 years 759            -               
2,383 351 Value at 31 March 1,725        336          
31st March 2023 31st March 2024
21 FINANCE LEASES
21.1 Finance Leases – Amounts Paid to Lessors
During 2017-18 the Council purchased a new cremator for Cardross Crematorium under a finance lease
arrangement. The amount paid under this arrangement in 2023-24 was as follows: 
2022-23 2023-24
£'000 £'000
63            Plant and Equipment 63             
63            Total 63             
21.2 Assets Held Under Finance Leases
Assets purchased under a finance lease are included within the assets of the Council and
depreciated over the life of the asset as follows: 
2022-23 2023-24
£'000 Vehicles, Plant and Equipment £'000
376           Value at 1 April 325           
-               Additions -               
(51)           Depreciation (51)           
325          Value at 31 March 274

Page 112

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 101 
21.3 Finance Lease Liability
The Council was committed at 31 March 2024 to making payments of £0.301m under finance leases
comprising the following elements:
Movements in 2023-24
£'000
Balance at 1 April 2023 (349)          
Additions -               
Repayments 48             
Finance Lease Liability at 31 March 2024 (301)         
Split:
Obligations payable within 1 year (63)           
Obligations payable between 1 and 5 years (251)          
Obligations payable after 5 years (29)           
Finance Lease Obligations at 31 March 2024 (343)         
Less Interest element of lease 42             
Finance Lease Liability at 31 March 2024 (301)           
Comparative Movements in 2022-23
£'000
Balance at 1 April 2022 (396)          
Additions -               
Repayments 47             
Finance Lease Liability at 31 March 2023 (349)         
Split:
Obligations payable within 1 year (63)           
Obligations payable between 1 and 5 years (251)          
Obligations payable after 5 years (92)           
Finance Lease Obligations at 31 March 2023 (406)         
Less Interest element of lease 57             
Finance Lease Liability at 31 March 2023 (349)

Page 113

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 102 
22 LONG TERM DEBTORS 
31st March
2023
31st March
2024
£'000 £'000
12            House Loans 11             
750           Waste PPP Historic Contamination Fund 750           
1,801        Charging Orders - Care Home Fees 2,099        
3,024        Strategic Housing Fund Loans to Registered Social Landlords 2,879        
293           Other Long Term Debtors 77             
5,880       Total Long Term Debtors 5,816         
23 DEBTORS 
£'000 £'000 £'000 £'000
18,990           Arrears of Local Taxation 20,310    
(16,844)         Less: Impairment of Bad Debts (17,776)   
2,146           2,534      
435               Housing Benefits Overpayments 375         
(299)              Less: Impairment of Bad Debts (277)       
136              98          
3,382            Debtor Accounts 4,586      
(1,172)           Less: Impairment of Bad Debts (1,121)     
2,210           3,465      
2,742           
Net Debtor to Scottish Government for Non
Domestic Rates 1,670      
4,316            VAT Recoverable from HMRC 2,807      
139             
Strategic Housing Fund Loans due within 1
Year 145         
7,456            Accrued Income 14,576    
8,041            Other Debtors 13,073    
27,186         Total Debtors 38,368   
31 March 202431 March 2023

Page 114

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 103 
24 ASSETS HELD FOR SALE
The movement in assets held for sale was:
2022-23 2023-24
£'000 £'000
1,509        1,554      
17              286          
-                 Additions -              
84              Revaluation losses -              
60              Revaluation gains 189          
-                Impairment losses -              
-                Assets declassified as "Held for Sale" (Property, Plant and Equipment) -              
(116)           Assets Sold (410)        
1,554        Balance Sheet amount at 31st March 2024 1,619       
Balance Sheet amount at 1st April 2023 
Assets newly classified as "Held for Sale" (Property, Plant  and Equipment)
Movements
25 CASH AND CASH EQUIVALENTS
The balance of Cash and Cash Equivalents is made up of the following elements:
31 March
2023
31 March
2024
£'000 £'000
4              3             
(218)          Cash in transit 794          
1,976        Short term deposits with banks 633          
6,850        Short term deposits in Money Market Funds 1,400       
(7,789)      Bank Current Accounts (12,821)    
823          Total Cash and Cash Equivalents (9,991)     
Cash held by the Authority

Page 115

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 104 
26 CREDITORS
31 March
2023
31 March
2024
£'000 £'000
11,707          Accrued Payrolls and Superannuation 9,174       
3,092            Accrued Employer's National Insurance Contributions and PAYE 3,495       
7,588            Accrual for Short Term Accumulating Absences 8,272       
96                 Creditors System Liability (19)          
9,095            Accrued Expenditure 10,774     
5,006            Health and Social Care Partnership Creditor 3,389       
1,022            RCGF Grant Income 2,060                                           
854               Trust Funds 901          
-                   Net Creditor to Scottish Government for Non Domestic Rates 1,408       
11,584          Other Creditors 12,920     
50,044         Total Creditors 52,374     
27 FINANCIAL INSTRUMENTS DISCLOSURES
27.1 Types of Financial Instruments
Accounting regulations require the “Financial Instruments” (investment, lending and borrowing of the
Council) shown on the balance sheet to be further analysed into various defined categories. The
investments, lending and borrowing disclosed in the Balance Sheet are made up of the following
categories of “Financial Instruments”:
Long Term Current Long Term Current
£'000 £'000 £'000 £'000
Investments and Lending
11,372      78,669               Loans and Receivables 6,774            48,559         
Borrowing
239,187    58,190               209,151        63,406         
31 March 202431 March 2023
Financial Liabilities at
amortised cost 
27.2 Fair Value of Assets and Liabilities Carried at Amortised Cost
Financial assets (represented by lending and receivables) and financial liabilities (represented by
borrowings) are carried in the Balance Sheet at amortised cost. Their fair value can be assessed by
calculating the present value of the cash flows that will take place over the remaining period of the
instrument, using the following assumptions:
• Estimated interest rates at 31 March 2024 for loans from the PWLB were taken from the
appropriate interest rate notice and for other loans receivable and payable from market rates
obtained by our treasury advisors.
• No early repayment or impairment is recognised.
• Where an instrument will mature in the next 12 months, the carrying amount is assumed to
approximate to fair value.
• The fair value of trade and other receivables is taken to be the invoiced or billed amount.
The fair values are calculated as follows:

Page 116

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 105 
Carrying
Amount Fair Value
Carrying
Amount Fair Value
£'000 £'000 £'000 £'000
Lending
90,041      90,041               Loans and Receivables 46,423          46,423         
Borrowing
297,377 315,566 Financial Liabilities 272,557        272,797       
31 March 2023 31 March 2024
The fair value is greater than the carrying amount because the Council’s lending figure includes a
number of loans where the interest rate receivable is higher than the rates available for similar loans at
the Balance Sheet date. The commitment to receive interest above the current market rates increases
the amount the Council would receive if it agreed the early repayment of loans.
27.3 Gains and Losses on Financial Instruments
There are no gains and losses recognised in the Comprehensive Income and Expenditure Statement in
relation to Financial Instruments.
27.4 Nature and Extent of Risks arising from Financial Instruments
The Council’s management of treasury risks actively works to minimise the Council’s exposure to the
unpredictability of financial markets and to protect the financial resources available to fund services. The
Council has fully adopted CIPFA’s Code of Treasury Management Practices and has written principles
for overall risk management as well as written policies and procedures covering specific areas such as
credit risk, liquidity risk and market risk.
27.5 Credit Risk
Credit risk arises from the short-term lending of surplus funds to banks, money market funds, building
societies and other local authorities as well as credit exposures to the Council’s customers. It is the
policy of the Council to place deposits only with a limited number of high quality banks and money market
funds whose credit rating is independently assessed as sufficiently secure by the Council’s treasury
advisers and to restrict lending to a prudent maximum amount for each institution.
The following analysis summarises the Council’s potential maximum exposure to credit risk, based on
past experience and current market conditions. No credit limits were exceeded during the financial year
and the Council expects full repayment on the due date of deposits placed with its counterparties.
Amount at      
31 March 2024
Historical
Experience of
Non-payment
adjusted for
Market
Conditions at
31 March 2024
Estimated
Maximum
Exposure to
Default and
Uncollectability
£'000 % £'000
2,033            -               -               Deposits with Banks and Money Market
Funds 
The information in respect of the Council’s debtors can be found in notes 22 and 23. The Debtor
Accounts represents the amounts owed by the Council’s customers; Other Debtors include prepaid
expenditure, accrued income and money owed to the Council in respect of projects being carried out under
partnerships where the Council is the lead partner. The bad debt provision shown in note 23 represents
the Council’s assessment of the likely recoverability of the debt outstanding.

Page 117

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 106 
The credit risk around unprovided for debt is considered to be low. Debtors relate to the normal business
of the Council and credit is issued on the Council’s standard credit terms. There are no significant
amounts past due but not impaired where recoverability is considered to be an issue.
27.6 Liquidity Risk
The Council’s main source of borrowing is the Treasury’s Public Works Loans Board (PWLB). There is
no significant risk that the Council will be unable to raise finance to meet its commitments under Financial
Instruments. The Council has safeguards in place to ensure that a significant proportion of its borrowings
does not mature for repayment at any one time in the future to reduce the financial impact of re-
borrowing at a time of unfavourable interest rates. The Council’s policy is to ensure that not more than
30% of the loans are due to mature within any financial year through a combination of prudent planning
of new loans taken out and, where it is economic to do so, making early repayments.
The maturity analysis of financial liabilities is as follows:
31 March
2023
31 March
2024
£'000 £'000
63,958      Less than one year 63,404         
5,357        Between one and two years 7,219           
19,048      Between two and five years 25,773         
209,014    More than five years 176,161       
297,377    272,557       
Maturity analysis of financial liabilities
All other amounts due to the Council for council tax, non-domestic rates and other income are due to be
paid in less than one year.
27.7 Market Risk
Changes in market interest rates influence the interest payable on borrowings and on interest receivable
on surplus funds invested. For example, a rise in interest rates would mean an increase in the interest
charged on borrowing at variable rates and an increased cost to the taxpayer. An increase in interest
rates would also mean an increase in the income received on lending at variable rates and a reduction
in cost for the taxpayer.
Changes in market rates also affect the notional “fair value” of lending and borrowing. For example, a
rise in interest rates would reduce the “fair value” of both lending and borrowing at fixed rates. Changes
in “fair value” of lending and borrowing do not impact upon the taxpayer and are confined to prescribed
presentational aspects in the Accounts.
The Council has a variety of strategies for managing the uncertainty of future interest rates and the
financial impact on the Council.
It is the policy of the Council to limit its exposure to variable rate borrowing to a maximum of 30% of
what it borrows.
During periods of falling rates and where it is economically advantageous to do so, the Council will
consider the repayment and restructuring of fixed interest rate debt.
The Council takes daily advice from its specialist treasury advisers and actively monitors changes in
interest rates to inform decisions on the lending of surplus funds, new borrowings and restructuring of
existing borrowings.
Any potential for a financial impact on the Council is also significantly limited by the Scottish
Government’s grant distribution mechanism that automatically adjusts for changes in interest rates in
the Government Grant support the Council receives for “loan charges”.

Page 118

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 107 
To illustrate the impact of changes in interest rates upon the Council, the following table shows the
financial effect if rates had been 1% higher at 31 March 2024, with all other variables held constant:
31 March
2024
Impact on tax-payer £'000
Increase on interest payable on variable rate borrowings 53                
Increase in interest receivable on variable rate lending -                  
Increases in government grant receivable for “loan charges” -                  
Net effect on Statement of Comprehensive Income & Expenditure 53                
31 March
2024
Other accounting presentational changes £'000
13,965          A decrease in the “fair value” of fixed rate borrowing
(disclosure confined to the notes to the financial statements)
The impact of a 1% fall in the interest rates would be as above but with the changes being reversed.
27.8 Price Risk
The Council has no investment classified as “available-for-sale”.
27.9 Foreign Exchange Risk
The Council does not lend or borrow in foreign currencies and has no exposure to gains or losses arising
from movements in exchange rates.
27.10 Short-Term Deposits
The short-term deposits arise as a result of the timing of expenditure and associated income and
movements in fund and revenue balances. The Council adopts a proactive but prudent approach to its
Treasury Management operations, which are governed by the fully revised edition of CIPFA’s Code of
Practice on Treasury Management.
31 March
2023
31 March
2024
£'000 £'000
8,826        Banks and Money Market Funds 2,033             
27.11 Soft Loans
The Council has no material soft loans at 31 March 2024, on which no interest was being charged. 
27.12 Short-Term Borrowing
The Common Good and the various Trust Funds administered by the Council had monies temporarily
invested with the Council’s loans fund during the year. The amounts at 31 March 2024 are shown in the
table below. Further details of the nature and amounts of the funds of the Common Good and Trust
Funds are shown in notes 36 and 37.
31 March
2023
31 March
2024
£'000 £'000
144           Common Good 157              
854           Trust Funds 901

Page 119

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 108 
28 OTHER LIABILITIES
Other liabilities consist of liabilities which by arrangement are payable at some point in the future or paid
off by an annual sum over a period of time. Other liabilities total £107.033m as at 31 March 2024 and
comprise the following:
Opening
Balance      
1 April 2024
Movement
in Year
Closing
Balance         
31 March
2024
£'000 £'000 £'000
(349)           48            (301)           
(111,214)     5,232        (105,982)     
(750)           -               (750)           
Total Other Liabilities (112,313) 5,280        (107,033)     
Split:
Short Term Liabilities (due within 1 year) (5,336)        
Long Term Liabilities (due after 1 year) (101,697)     
Total Other Liabilities (107,033)     
Movements in 2023-24
Finance Lease Liability (See note 21.3)
Schools Finance Lease Liability (See note 19.2)
Land Contamination 
29 PROVISIONS
Opening
Balance      
1 April 2023
Additional
Provision
Amounts
Used
Unused
Amounts
Reversed
Closing
Balance at
31 March
2023
£'000 £'000 £'000 £'000 £'000
(13)             (13)            
Employee Settlement Provision (51)             51              -                
SRC Intromissions (19)             19              -                
SW - Mull Homecare Backdated Pay (13)             (13)            
(108)           (7)               (115)          
(53)             16              (37)            
Service Choices Redundancy Costs (16)             (137)           14              2                (137)          
(2,336)        (404)           (2,740)       
(237)           (44)             37              (244)          
Litigation Claims (196)           (196)          
Insurance Excess Provision -                 -                
(865)           (487)           195            132            (1,025)       
Total Provisions (3,894) (1,092)      279          187          (4,520)     
Split:
Short Term Provisions (due within 1 year) (1,665)       
Long Term Provisions (due after 1 year) (2,855)       
Total Other Liabilities (4,520)     
NPDO and Hub DBFM Payments
Equal Pay Claims
Commercial Rent Balances
Income due to Registered Social Landlords
Landfill Sites - Restoration and Aftercare Costs
Utilities Provision
A provision was created at the end of 2005-06 in relation to employees in catering, cleaning and home
care services who had not accepted the Council’s equal pay settlement. There may be further
outstanding claims where the settlement amount cannot be estimated reliably enough to provide for the
costs.

Page 120

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 109 
The Council reduced the discount on Council Tax from second homes to 10% during 2005-06. The
additional Council Tax income invoiced during 2023-24 amounted to £2.575m; this amount is to be paid
to registered social landlords to invest in social housing. A provision for cash not yet collected has been
created amounting to £0.115m.
There is a provision for Commercial Rents where arrangements have been put in place for repayment
over a number of years. The provision reflects the uncertainty of collection of the debt.
Liabilities have arisen in respect of employees who will be made redundant as a result of savings options
agreed. The cost for any employee, whose contract has been terminated on or before 31 March 2024
has been incurred in year. For the employees who have confirmed acceptance of redundancy but have
left or are leaving after 31 March 2024, a provision of £0.137m has been created.
A provision for landfill sites was created in 2014-15 reflecting the Council’s liability for restoration and
ongoing maintenance in respect of landfill sites operated by the Council, at Glengorm, Gartbreck and
Gott Bay. The landfills sites were revalued at 31 March 2024 and the provision for restoration and
aftercare increased to £2.740m. These have been provided for based on the net present value of
estimated future costs.
The utilities provision was created during 2011-12 to cover a potential liability in relation to discrepancies
in charges for utility costs, £0.044m has been reversed during 2023-24 and a further £0.037m additional
provision has been added resulting in a total provision of £0.244m.
A legal litigation provision was created in 2020-21 as the Council is currently involved in several ongoing
cases that will incur costs into future years.  The provision is based on sums invoiced and anticipated
future costs.
The NPDO provision for withheld sums from the Unitary Charge paid to ABC Schools relates to disputed
performance deductions and unbilled utility costs. The HUB DBFM provision for withheld sums from the
Monthly Service Payment paid to Hub North Scotland (O&C) Ltd relates to disputed performance
deductions. 
30 CAPITAL GRANTS RECEIVED IN ADVANCE 
A Capital Grant of £1.564m was received in advance for 2023-24 in respect of the Cuan Sound/Jura
Ferry Programme.
Opening
Balance      
1 April
2023
Capital
Grants
Received
Amounts
Used
Closing
Balance         
31 March
2024
£'000 £'000 £'000 £'000
-               1,564        1,564       
-               -               -              
Total Other Liabilities -           1,564        -           1,564       
Split:
Capital Grant Receipts in Advance (due within 1 year) -              
Capital Grant Receipts in Advance (due after 1 year) 1,564       
Total Other Liabilities 1,564       
HITRANS

Page 121

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 110 
31 DEFINED BENEFIT PENSION SCHEMES
Participation in Pension Schemes
As part of the terms and conditions of employment of its officers, the Council makes contributions
towards the cost of post-employment benefits. Although these benefits will not actually be payable until
employees retire, the Council has a commitment to make the payments (for those benefits) and to
disclose them at the time that employees earn their future entitlement.
The Council participates in two separate pension schemes which meet the needs of employees in
particular services. Both schemes provide members with defined benefits related to pay and service.
The schemes are as follows:
Teachers
The Scottish Teachers’ Superannuation Scheme is an unfunded scheme administered by the Scottish
Government. This means that liabilities for the benefits provided cannot be identified by the Council. The
scheme is therefore accounted for as if it were a defined contribution scheme where no liability for future
payments of benefits is recognised in the balance sheet and revenue accounts are charged with the
employer’s contributions payable to the Scottish Government in the year.
Local Government Pension Scheme
This is administered by Strathclyde Pension Fund – this is a funded defined benefit final salary scheme,
meaning that the Council and employees pay contributions into a fund, calculated at a level intended to
balance the pension’s liabilities with investment assets. The contributions are based on rates determined
by the Fund’s professionally qualified actuary and based on triennial valuations of the Fund.
The principal risks to the Council of the scheme are the longevity assumptions, statutory changes to
the scheme, changes to inflation, bond yields and the performance of the equity investments held by
the scheme. These are mitigated to a certain extent by the statutory requirements to charge to the
General Fund the amounts due by statute as described in the accounting policies note.
31.1 Accrued Pensions Contribution
Due to the timing of salary processing, not all employee and employer contributions have been paid to
the pension schemes by the 31 March 2024. These payments have been accrued and are included
within the creditors figure on the Balance Sheet. These have been paid during April 2024. The amounts
are as follows:
• Local Government Pension Scheme – £2.040m
• Teachers’ Scheme – £1.304m
31.2 Transactions in Respect of the Local Government Pensions Scheme
The latest formal valuation of the Strathclyde Pension Fund for funding purposes was at 31 March 2020.
The independent actuaries appointed by the Council are Hymans Robertson and they have assumed
that employees have continued to earn new benefits on the same basis as the latest formal valuation
and that the employer’s pensionable payroll over the year to 31 March 2024 remains substantially stable
with new entrants replacing any leavers.
We recognise the cost of retirement benefits in the Net Cost of Services when they are earned by
employees, rather than when the benefits are eventually paid as pensions. However, the charge we are
required to make against Council Tax is based on the cash payable in the year, so the real cost of
retirement benefits is reversed out of the General Fund via the Movement in Reserves Statement. 
The following transactions have been made in the Comprehensive Income and Expenditure Statement
and the General Fund via the Movement in Reserves Statement during the year:

Page 122

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 111 
2022-23 2023-24
£'000 £'000
36,689        Current Service Cost 19,119          
637            Past Service Cost (Including Curtailments) -                   
37,326       Net Cost of Services 19,119         
141            Net Interest Expense (6,596)           
37,467       12,523         
37,377        Return on Assets (excluding amounts included in net interest) (43,972)         
46,257        Other Experience (see note (i) below) 56,060          
(337,163)     Change in Financial and Demographic Assumptions (32,078)         
Changes in the effect of the asset ceiling (103,890)       
99,179        IAS 19 Asset Ceiling Adjustment -                   
(116,883)    (111,357)      
Statement of Movement in Reserves:
(19,970)      6,322           
17,497       Employer's Contributions Payable to the Scheme 18,845         
Comprehensive Income and Expenditure Statement:
Cost of Services:
Total Post Employment Benefit Charged to the Surplus or Deficit on
the Provision of Services
Other Post Employment Benefit Charged to the Comprehensive
Income and Expenditure Statement
Total Post Employment Benefits Charged to the Comprehensive
Income and Expenditure Statement
Reversal of net charges made to the Surplus or Deficit for the Provision of
Services for post employment benefits in accordance with the Code
Actual Amount charged against the General Fund Balance for
pensions in the year:
Service cost comprising:
(i) A measure of the difference between actual experience and that expected based upon a set of actuarial assumptions,
during the period between two actuarial valuation dates, as determined in accordance with a particular cost method.
(ASOP No. 4)

Page 123

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 112 
31.3 Assets and Liabilities in Relation to Post-Employment Benefits
Reconciliation of present value of the scheme liabilities (defined benefit obligation):
2022-23 2023-24
£'000 £'000
871,242     622,872       
36,689        Current Service Cost 19,119          
637            Past Service Costs including Curtailments -                   
23,775        Interest Cost 29,453          
4,833          Contributions by Scheme Participants 5,280            
(311,081)     Re-measurement (Gains) and Losses 2,949            
(23,398)       Estimated Benefits Paid (30,102)         
602,697     Defined Benefit Obligation at 31 March 24 649,571       
20,175        Present Value of Unfunded Liabilities 19,578          
622,872     Defined Benefit Obligation at 31 March 24 669,149       
Defined Benefit Obligation at 1 April 23
Reconciliation of fair value of the scheme (plan) assets:
2022-23 2023-24
£'000 £'000
875,876     861,065       
Re-measurement (Gains) and Losses:
(37,377)       Expected Rate of Return on Pension Fund Assets 43,972          
-                 Actuarial (Gains) and Losses (1,455)           
23,634        Interest Income on Plan Assets 40,760          
17,497        Employers Contributions 18,845          
4,833          Contributions by Scheme Participants 5,280            
(23,398)       Estimated Benefits Paid (30,102)         
861,065     Fair Value of Employer Assets at 31 March 24 938,365       
Fair Value of Employer Assets at 1 April 23
The expected return on scheme assets is determined by considering the expected returns available on
the assets underlying the current investment policy. Expected yields on fixed interest investments are
based on gross redemption yields as at the Balance Sheet date. Expected returns on equity investments
reflect long-term real rates of return experienced in the respective markets. An asset ceiling adjustment
was included in 2022-23 to ensure compliance with IAS 19 which limits the measurement of a net defined
benefit asset to the lower of the surplus in the defined benefit plan and the asset ceiling. No adjustment
was required in 2023-24. The asset ceiling is defined as the present value of any economic benefits
available in the form of refunds from the plan or reductions in future contributions to the plan.

Page 124

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 113 
31.4 Pensions Assets and Liabilities Recognised in the Balance Sheet
2022-23 2023-24
£'000 Local Government Pension Scheme £'000
(602,697)     Present Value of Funded Liabilities (649,571)       
861,065      Fair Value of Employer Assets 938,365        
(99,179)       IAS19 Asset Ceiling Adjustment -                   
159,189     Surplus/(Deficit) in the Scheme 288,794       
(20,175)       Present Value of Unfunded Liabilities (19,578)         
139,014     Net Surplus/(Deficit) in the Scheme 269,216         
The liabilities show the underlying commitments that the Council has in the long run to pay post-
employment (retirement) benefits.

Page 125

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 114 
31.5 Analysis of Pension Fund’s Assets
Argyll and Bute Council’s share of the Pension Fund’s assets at 31 March 2024 comprised: 
2022-23 2023-24
£'000 £'000
16,312        Cash and Cash Equivalents 17,395          
Equity Instruments (by industry type)
38,629        Consumer 43,350          
48,013        Manufacturing 54,078          
4,310          Energy and Utilities 8,511            
18,331        Financial Institutions 26,936          
30,629        Health and Care 25,047          
29,776        Information Technology 31,804          
-             Other -               
169,688      Sub-total Equity Instruments 189,726        
Bonds (by sector)
-             Corporate -               
-             Government -               
-             Sub-total Bonds -               
Real Estate
70,994        UK Property 73,783          
-             Overseas Property -               
70,994        Sub-total Real Estate 73,783          
211,640      Private Equity (All) 224,026        
Investment Funds and Unit Trusts
285,352      Equities 323,600        
99,304        Bonds 109,461        
336            Commodities 374               
5,529          Infrastructure -               
1,911          Other -               
392,432      Sub-total Investment Funds and Unit Trusts 433,435        
Derivatives
(1)               Forward Foreign Exchange Contracts -               
-             Other -               
(1)               Sub-total Derivatives -               
861,065     Total Assets 938,365

Page 126

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 115 
2022-23           2023-24
£'000 Fair Value of Pension Fund Assets       £'000           
Equity Securities            
168,144    Quoted in an Active Market               189,520 
1,544   
Not Quoted in an Active
Market                     206 
169,688  Sub-total Equity Securities                189,726 
31.6 Basis for Estimating Assets and Liabilities
The Council’s share of the liabilities of Strathclyde Pension Fund have been assessed on an actuarial
basis using the projected unit method, an estimate of the pensions that will be payable in future years
dependent on the assumptions about mortality rates, salary levels, etc.
The principal assumptions used by the actuary have been:
2022-23 2023-24
Years Mortality assumptions Years
19.3 Longevity at 65 for current pensioners: Men 20.0              
22.2 Women 22.7              
20.5 Longevity at 65 for future pensioners: Men 20.9              
24.2 Women 24.7              
2022-23 2023-24
% Financial Assumptions %
3.0% Rate of Inflation (CPI) 2.8%
3.7% Rate of Increase in Salaries 3.5%
3.0% Rate of Increase in Pensions (CPI) 2.8%
4.8% Rate for discounting scheme liabilities 4.8%
2022-23 2023-24
% Long-term Expected Rate of Return on Assets in the Fund %
4.8% Equity Investments 4.8%
4.8% Bonds 4.8%
4.8% Property 4.8%
4.8% Cash 4.8% 
An allowance is included for future retirements to elect to take 50% of the maximum additional tax-free
cash up to HMRC limits for pre-April 2009 service and 75% of the maximum tax-free cash for post-April
2009 service.
For sensitivity analysis on the net pension liability please see Note 4 on page 74.
31.7 Asset and Liability Matching (ALM) Strategy
The main fund (Fund 1) of Strathclyde Pension fund does not have an asset and liability matching
strategy (ALM) as this is used mainly by mature funds. The Fund does match, to the extent possible,
the types of assets invested to the liabilities in the defined benefit obligation. As is required by the
pensions and investment regulations, the suitability of various types of investment has been considered,
as has the need to diversify investments to reduce the risk of being invested into too narrow a range.

Page 127

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 116 
31.8 Impact on the Council’s Cash Flow
The objectives of the Fund are to keep employers’ contributions at as constant a rate as possible. The
Fund has agreed a strategy to achieve a funding rate of 100% in the longer term. The Scheme is a multi-
employer defined benefit plan and employers’ contributions have been determined so that employee
and employer rates are standard across all participating Local Authorities. Employer’s contributions have
been set at 6.5% for 2024-2025.
The total contributions expected to be made to the Local Government Pension Scheme by the Council
in the year to 31 March 2025 is £5.780m. This is based on an assumed pensionable payroll of
£88.926m.
The assumed weighted average duration of the defined benefit obligation for the Council falls into the
“Medium” duration category which is between 17 and 23 years (this is different from the mortality
assumptions quoted in the table above in “Basis for Estimating Assets and Liabilities”). 
31.9 Teachers Pensions – Administered By Scottish Public Pensions Agency
Teachers employed by the Council are members of the Scottish Teachers’ Superannuation Scheme,
administered by the Scottish Public Pensions Agency. The Scheme is an unfunded statutory public
service pension scheme with benefits underwritten by the UK Government. The Scheme is financed by
payments from employers and from those current employees who are members of the Scheme and
paying contributions at progressively higher marginal rates based on pensionable pay, as specified by
the regulations.
Employers currently pay a contribution rate of 23% - about two thirds of the cost of an individual's
pension. This took effect from 1 September 2019.
The Council has no liability for other employers’ obligations to the multi-employer scheme. As the
scheme is unfunded there can be no deficit or surplus to distribute on the wind-up of the Scheme or
withdrawal from the Scheme.
The scheme is an unfunded multi-employer defined benefit scheme. It is accepted that the scheme can
be treated for accounting purposes as a defined contribution scheme in circumstances where the
Authority is unable to identify its share of the underlying assets and liabilities of the scheme.
At the last valuation a shortfall of £1.3 billion was identified in the notional fund which will be repaid by
a supplementary rate of 4.5% of employers’ pension contributions for fifteen years from 1 April 2015.
This contribution is included in the 23% employers’ contribution rate.
As a proportion of the total contributions into the Teachers’ Pension Scheme during the year ended 31
March 2024, the council’s own contributions equate to 1.53%.
9,853          Amount Paid Over (£'000) 10,779 
23.00% Rate of Contribution (%) 23.00%
508            Amount of Added Years Awarded by the Council (£'000) 507     
2023-242022-23
The contributions due to be paid to the Teacher’s Scheme by the Council in the next financial year are
estimated to be £12.707m.

Page 128

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 117 
32 UNUSABLE RESERVES
Movements in the Council’s unusable reserves are detailed in the Statement of Movement in
Reserves.
32.1 Revaluation Reserve
The Revaluation Reserve contains the gains made by the Council arising from increases in the value of
its Property, Plant and Equipment. The balance is reduced when assets with accumulated gains are:
• Revalued downwards or impaired and the gains are lost
• Used in the provision of services and the gains are consumed through depreciation, or
• Disposed of and the gains are realised.
The reserve contains only revaluation gains accumulated since 1 April 2007, the date that the Reserve
was created. Accumulated gains arising before that date are consolidated into the balance on the Capital
Adjustment Account.
32.2 Capital Adjustment Account
The Capital Adjustment Account absorbs the timing differences arising from the different arrangements
for accounting for the consumption of non-current assets and for financing the acquisition, construction
or additions to those assets under statutory provisions. The Account is debited with the cost of
acquisition, construction or subsequent costs as depreciation, impairment losses and amortisations
which are charged to the Comprehensive Income and Expenditure Statement (with reconciling postings
from the Revaluation Reserve to convert current and fair value figures to a historical cost basis). The
Account is credited with the amounts set aside by the Council as finance for the costs of acquisition,
construction and subsequent costs.
The Account contains accumulated gains and losses on Investment Properties.
The Account also contains revaluation gains accumulated on Property, Plant and Equipment before 1
April 2007, the date the Revaluation Reserve was created to hold such gains.
32.3 Financial Instruments Adjustment Account
The Financial Instruments Adjustment Account absorbs the timing differences arising from the different
arrangements for accounting for income and expenses relating to certain financial instruments and for
bearing losses or benefiting from gains per statutory provisions. The Council uses the Account to
manage premiums paid on the early redemption of loans. Premiums are debited to the Comprehensive
Income and Expenditure Statement when they are incurred, but reversed out of the General Fund
Balance to the Account in the Movement in Reserves Statement. Over time, the expense is posted back
to the General Fund Balance in accordance with statutory arrangements for spreading the burden on
Council Tax.
32.4 Pensions Reserve
The Pensions Reserve absorbs the timing differences arising from the different arrangements for
accounting for post-employment benefits and for funding benefits in accordance with statutory
provisions. The Council accounts for post-employment benefits in the Comprehensive Income and
Expenditure Statement as the benefits are earned by employees accruing years of service, updating the
liabilities recognised to reflect inflation, changing assumptions and investment returns on any resources
set aside to meet the costs. However, statutory arrangements require benefits earned to be financed as
the Council makes employer’s contributions to pension funds. The credit balance on the Pensions
Reserve therefore shows a surplus in the benefits earned by past and current employees and the
resources the Council has set aside to meet them.

Page 129

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 118 
32.5 Accumulated Absences Account
The Accumulated Absences Account absorbs the differences that would otherwise arise on the General
Fund Balance from accruing for compensated absences earned but not taken in the year, e.g. annual
leave entitlement carried forward at 31 March. Statutory arrangements require that the impact on the
General Fund Balance is neutralised by transfers to or from the Account. 
33 USABLE RESERVES
Movements in the Council’s usable reserves are detailed in the Statement of Movement in
Reserves. 
33.1 Capital Funds
The Council holds two funds which make up the Capital Funds total in the Statement of Movement in
Reserves, these are:
Usable Capital Receipts Reserve
During the 2006-07 financial year, and prior to the transfer of the Council’s housing stock during
November 2006, the receipts from the sale of council houses were transferred to the Usable Capital
Receipts Reserve. The amounts held in this reserve can only be used for social housing capital
expenditure.
Capital Fund
During the 2007-08 financial year the Council established a Capital Fund under Section 22 of Schedule
3 of the Local Government (Scotland) Act 1975. All receipts from capital disposals are to be paid into
this fund with effect from 14 February 2008.
The movement in the Usable Capital Receipts Reserve and Capital Fund are as follows:
Usable
Capital
Receipts
Reserve
Capital    
Fund
Total     
Capital
Funds
£'000 £'000 £'000
Balance at 1 April 2023 2,935         1,568          4,503        
Proceeds of Disposals -                 671             671           
Transfer to Capital Adjustment Account -                 (2,207)         (2,207)       
Contribution to Capital Fund From Revenue -                 -                 -                
Interest Earned 145            85               230           
Balance at 31 March 2024 3,080         117             3,197        
Movements in 2023-24
33.2 Repairs and Renewals Fund
The movement in the Education Repairs and Renewals Fund is as follows:
Balance at
1 April
2023
Contribution
from
Revenue
Interest
Earned
Contribution
to Revenue
Balance at
31 March
2024
£'000 £'000 £'000 £'000 £'000
Education 2,916          (860)            135            572             2,763         
Total 2,916         (860)           135            572             2,763        
Movements in 2023-24

Page 130

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 119 
34 CONTINGENT LIABILITIES
34.1 Equal Pay Claims
The Council settled a number of equal pay claims during 2017-18, however there are a small number
remaining where the outcome of the applications are unknown and there is insufficient information to
allow the potential cost of these claims to be provided for. There is also the potential for other equal pay
claims whose costs may be met by the Council.
34.2 Goodwin Judgement
The Social Security Act 1986 introduced changes to survivor pensions which resulted in most public
service pension schemes providing survivor benefits to widowers (male survivors in opposite-sex
marriages) based on the female spouse’s service from 6 April 1988 onwards. Since the introduction of
civil partnerships and same sex marriages, public service pension schemes have provided survivor
benefits in respect of both which have been in line with those paid to widowers. An employment tribunal
(the Goodwin case) concluded on 30 June 2020 that a female member in an opposite sex marriage is
treated less favorably than a female in a same sex marriage or civil partnership, and that treatment
amounts to direct discrimination on grounds of sexual orientation. Where schemes contain provisions
deemed discriminatory, those provisions must be dis-applied as being contrary to the non-discrimination
rule set out in section 61 of the Equality Act 2010. In light of this ruling the Chief Secretary to the Treasury
has confirmed that amendments would be made to the Teachers’ Pension Scheme and other public
service pension schemes so that “surviving male same-sex and female same-sex spouses and civil
partners will, in certain cases, receive benefits equivalent to those received by widows of opposite sex
marriages” 
There is still uncertainty surrounding the potential remedy to the Goodwin judgement however the
Council’s actuaries have estimated the potential impact of implementing a solution to correct the past
underpayment of spouses’ benefits to be circa 0.1% of gross obligations. This would amount to £0.669m
at 0.1% for the Council.  As there is still uncertainty over the remedy and the potential impact no provision
has been made in the accounts at the current time.
34.3 Other Legal Challenges
There may be other legal challenges on-going which could result in future liabilities. 
35 TERMINATION BENEFITS
A number of savings options have been agreed at Council budget meetings to balance the Council budget.
A number of these savings options were reliant on a reduction in the Councils staffing levels.  The Council
had forewarning of the level of savings required to balance the budget and had previously asked all Council
employees to express an interest in voluntary redundancy. As a result of the budget savings options
approved by the Council a number of employees have had their redundancy application accepted. 
Redundancy costs have been incurred by the Council since the 2010-11 financial year in relation to the
budget savings agreed. In each year, provision was made within the financial year for the costs of all
employees who had accepted redundancy or where redundancy was probable as at 31 March ending that
year, including accounting for costs for employees who confirmed redundancy by 31 March but left or were
leaving after this date.   
Termination costs for all Council employees who have accepted redundancy by 31 March 2024 are
recognised in the Exit Packages note in 2023-24, or in previous financial years.  The total cost recognised
in the Exit Packages note in 2023-24 is £0.276m for 4 employees and in 2022-23 was £0.622m for 10
employees.  These costs are detailed further in the Remuneration Report on page 47. 
The reduction in the staffing establishment includes posts from all services across the Council and
reductions were in line with the savings agreed by the Council. There will be further redundancy costs

Page 131

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 120 
incurred as the Council is required to make further savings to balance the budget in future years and the
council have earmarked monies from the loans fund one-off reprofiling gain. 
36 TRUST FUNDS AND OTHER THIRD PARTY FUNDS
The Council acts as sole or custodian trustee for 57 trust funds. The funds do not represent assets of
the Council, and as such have not been included in the Balance Sheet.
Funds for which the Council act as sole trustee:
Income Expenditure Net Assets Reserves
£'000 £'000 £'000 £'000
23              17               707            707            
3                3                 67              67              
35              -                 1,208          1,208         
22              16               470            470            
Total Trust Funds 83              36              2,452         2,452         
Argyll Education Trust
GM Duncan Trust
MacDougall Trust
Various Other Trust Funds
Argyll Education Trust: this is made up of a number of small trusts to award prizes, bursaries, etc. to
pupils and ex-pupils of schools within the former Argyll County Council area. GM Duncan Trust: for the
provision of fuel, clothing and foodstuffs for the needy of Campbeltown. MacDougall Trust: for the
provision of sheltered housing on the Ross of Mull.
Further information on the Trust Funds, administered by the Council, can be obtained from Financial
Services within the Chief Executive’s Unit.
A number of the trust funds administered by the Council are charitable trusts and as such are required
to comply with current Office of the Scottish Charities Regulator (OSCR) financial reporting
requirements. Arrangements have been put in place to ensure that all charities administered by the
Council comply and will continue to comply with these requirements. 
37 COMMON GOOD FUNDS
The Council administers the Common Good Accounts for the former Burghs of Oban, Campbeltown,
Rothesay, Dunoon, Lochgilphead, Inveraray, Cove and Kilcreggan. The figures below summarise the
aggregate income and expenditure for the year as well as providing a snapshot picture of the assets
and liabilities at 31 March 2024. The Common Good Funds are for the benefit of the geographical areas
of the former burghs. Further information on the Common Good Funds can be obtained from Financial
Services. 
37.1 Common Good Income and Expenditure Account for the year ended 31 March 2024 
Oban
Common
Good
Other
Common
Goods
Total
Common
Good
Oban
Common
Good
Other
Common
Goods
Total
Common
Good
£'000 £'000 £'000 £'000 £'000 £'000
258        74          332        Expenditure 129        54          183       
(57)         (42)         (99)         Income (232)       (150)       (382)      
201        32          233        (Surplus)/Deficit for the Year (103)      (96)        (199)     
2022-23 2023-24

Page 132

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 121 
37.2 Common Good Balance Sheet at 31 March 2024 
Oban
Common
Good
Other
Common
Goods
Total
Common
Good
Oban
Common
Good
Other
Common
Goods
Total
Common
Good
£'000 £'000 £'000 £'000 £'000 £'000
5,711     319        6,030     Tangible Fixed Assets 5,622     319        5,941    
1,939     1,148     3,087     Investments 2,113     1,252     3,365    
147        183        330        Current Assets 171        176        347       
(15)         -         (15)         Current Liabilities (21)        (1)          (22)       
7,782     1,650     9,432     Total Assets less Liabilities 7,885    1,746    9,631   
5,711     323        6,034     Revaluation Reserve 5,622     323        5,945    
2,071     1,327     3,398     Common Good Fund 2,263     1,423     3,686    
7,782     1,650     9,432     Total Net Worth 7,885    1,746    9,631   
2022-23 2023-24
38 TAX INCREMENTAL FINANCING (TIF) PROJECTS 
The Council entered into an agreement with the Scottish Government in May 2014 in respect of the Lorn
Arc Tax Incremental Finance (TIF) scheme. This agreement essentially allows for the repayment of debt
arising from infrastructure investment from incremental Non-Domestic Rates (NDR) revenue. 
The assets to be funded by the TIF project largely comprise public realm and infrastructure
improvements within the Lorn Arc area of Oban. The project is for 25 years, with the first material capital
investment incurred during the financial year ended 31 March 2015. 
During the TIF project period, the Council is entitled to retain the TIF revenue from its NDR revenue, a
pro-rata amount of NDR equal to the amount (if any) by which the collected amount exceeds the
collectable amount. The Council is required to apply 100% of the TIF revenue towards repayment of the
TIF debt. If all projects are delivered and debt is fully paid, the Council can retain 50% of the TIF revenue
for further infrastructure investment until the end of the TIF period. 
Net capital expenditure incurred in the year to 31 March 2024, to be funded from borrowing, in respect
of TIF assets totalled £0.016m (2022-23 £0.023m). This is reflected in the “Summary of Capital
Expenditure and Financing” outlined within note 15.4. The total TIF debt to be repaid over the project
period, in respect of investment to 31 March 2024, has been calculated in accordance with finance
circular No. 4/2014 at £1.027m (2022-23 £1.011m).
There is a retention of £0.804m of TIF income during 2023-24 (2022-23 £0.623m) to repay the notional
borrowing for TIF. Principal sums accumulated by 2023-24 amount to £0.139m (2022-23 £0.137m) and
cumulative interest £0.118m (2022-23 £0.117m) resulting in a net cumulative surplus of £2.551m (2022-
23 £1.749m) which will be used to pay down TIF debt per the TIF agreement and the balance of £1.663m
will be placed in earmarked reserves to be used in future years to repay debt costs.

Page 133

Council Tax Income Account 
www.argyll-bute.gov.uk  ______________________________________________ Page 122 
39 CASH FLOW STATEMENT – OPERATING ACTIVITIES
The Net Cash Flows for Operating Activities can be reconciled to the Net (Surplus)/Deficit on the
Provision of Services as follows:
2022-23 2023-24
£'000 £'000
6,047        Net (Surplus)/Deficit on Provision of Services (9,765)      
3,356        Statutory Adjustments through Statement of Movement in Reserves 16,341     
322           Transfer to/from Other Statutory Reserves 77           
288           Increase/(Decrease) in Inventories (87)          
6,355        Increase/(Decrease) in Debtors 12,763     
(6,503)       (Increase)/Decrease in Creditors and Provisions (3,246)      
(16,041)     Earmarked Reserves (1,532)      
(2,938)       Capital Financed from Current Revenue (1,616)      
(4,277)       Loans Fund Repayments (6,111)      
(1,872)       Other Revenue Adjustments 4,996       
(21,310)     21,585     
11,071      Non Cash Capital 10,743     
(5,116)       Capital Element of Finance Lease Payments (449)        
5,955        10,294     
(9,308)       Net Cash Flows from Operating Activities 22,114     
6,742        Interest Paid on Borrowings 5,097       
8,887        Interest Paid on Finance Leases 8,599       
(748)         Interest Received on Bank Deposits (3,469)      
14,881      Net Cash Outflow from Servicing of Finance 10,227     
Adjustments to Net (Surplus)/Deficit on the Provision of Service for Non
Cash Movements:
Adjustments for items included in the Net (Surplus)/Deficit on the
Provision of Services that are Investing and Financing Activities:
The cash flows for Operating Activities include the following items:
40 CASH FLOW STATEMENT – INVESTING ACTIVITIES
The cash flows for Investing Activities include the following items:
2022-23 2023-24
£'000 £'000
25,659      25,221     
(17,500)     (37,500)    
(568)         (671)        
(21,914)     (25,687)    
(14,323)     Net Cash Outflow from Investing Activities (38,637)    
Purchase of Property, Plant and Equipment, Investment Property and
Intangible and Heritage Assets
Proceeds from the Sale of Property, Plant and Equipment and Investment
Property
Other Receipts from Investing Activities
Investments made/(disposed of) during year

Page 134

Council Tax Income Account 
www.argyll-bute.gov.uk  ______________________________________________ Page 123 
41 CASH FLOW STATEMENT – FINANCING ACTIVITIES
The cash flows for Financing Activities include the following items: 
2022-23 2023-24
£'000 £'000
(35,228)     (31,128)    
2,021        (1,072)      
5,116        5,280       
70,627      54,257     
42,536      Net Cash (Inflow)/Outflow from Financing Activities 27,337     
Cash Payments for the Reduction of the Outstanding Liabilities relating to
Finance Leases and on Balance Sheet PFI Contracts
Other Receipts from Financing Activities
Repayments of Short and Long Term Borrowing
Cash Receipts of Short and Long Term Borrowing

Page 135

Council Tax Income Account 
www.argyll-bute.gov.uk  ______________________________________________ Page 124 
The Council Tax Income Account shows the gross income raised from council tax levied and deductions
made under the Local Government Finance Act 1992. The resultant net income is transferred to the
Comprehensive Income and Expenditure Statement of the Council. 
2022-23 2023-24
Actual Actual
£'000 £'000
72,340    Gross Council Tax Levied and Contributions in Lieu excluding RSL Second
Home Additional Income 76,511
Less:
(13,269)  Other Discounts and Reductions (14,008)
(4,300)    Cost of living contribution  (grant funded) -
(1,411)    Provision for Bad and Doubtful Debts (1,490)
53,360   Total 61,013
540        Adjustment to Previous Years' Community Charge and Council Tax 896
53,900   Transfers to General Fund 61,909

Page 136

Notes to the Council Tax Income Account 
www.argyll-bute.gov.uk  ______________________________________________ Page 125 
1. CALCULATION OF THE COUNCIL TAX
Dwellings are valued by the Assessor and placed within a valuation band ranging from the lowest “A” to
the highest “H”. The Council Tax charge is calculated using the Council Tax Base, Band D equivalent
as below. This value is then decreased or increased dependent upon the band of the dwelling. The
charge for each band for 2023-24 was as follows:
Band Valuation Band £ per year
A Up to £27,000 986.13
B £27,001 - £35,000 1,150.49
C £35,001 - £45,000 1,314.84
D £45,001 - £58,000 1,479.20
E £58,001 - £80,000 1,943.50
F £80,001 - £106,000 2,403.70
G £106,001 - £212,000 2,896.77
H Over £212,000 3,624.04
6/9
7/9
8/9
9/9
473/360
585/360
705/360
882/360
Ratio Band D
2. CALCULATION OF THE COUNCIL TAX BASE 2023-24 
Council Tax Base A B C D E F G H Total
Total Number of Properties 7,447 10,136 9,564 6,415 7,769 4,520 3,035 258 49,144
Less - 1,036 792 1,003 534 637 271 167 52 4,491
- 932 1,145 821 494 471 229 123 6 4,220
Effective Number of Properties 5,479 8,199 7,740 5,388 6,661 4,021 2,746 201 40,434
Band D Equivalent Factor (ratio) 67% 78% 89% 100% 131% 163% 196% 245%
3,653 6,377 6,880 5,388 8,752 6,533 5,378 491 43,452
Add Contribution in lieu in respect of Class 18 dwellings (Band D Equivalent) 518
Nominal Tax Yield 43,970
Less Provision for Council Tax Reduction Scheme 9.08% 3,994
Council Tax Base 2023-24 - Number of Band D equivalents 39,976
Exemptions /
Deductions
Adjustment for Single
Chargepayers
Band D Equivalent Number of
Properties

Page 137

Non Domestic Rate Income Account 
www.argyll-bute.gov.uk  ______________________________________________ Page 126 
The Non-Domestic Rate Income Account is an agent’s statement that reflects the statutory obligation
for billing authorities to maintain a separate Non-Domestic Rate Account. The statement shows the
gross income from the rates and deductions made under the Local Government (Scotland) Act 1975 as
amended by the Local Government Finance Act 1992 on non-domestic property. The net income is paid
to the Scottish Government as a contribution to the national non-domestic rate pool.
2022-23 2023-24
Actual Actual
£'000 £'000
56,489    Gross rates levied and Contributions in Lieu 68,224
Less:
(17,430)  Reliefs and other deductions (21,766)
-         Payment of Interest -        
(391)       Write-off of Uncollectable Debts and Allowance for Impairment (464)
38,668   Total Net Non-Domestic Rate Income 45,994
(3,487)    Adjustments for prior years (858)      
-         Business Rate Incentivisation Scheme (BRIS) NDR Income Retained -
(647)       Tax Incremental Finance (TIF) Scheme NDR Income Retained (804)
34,534   Contribution to National Non-Domestic Rate Pool 44,332
(1,355)    Difference between Distributable and Contributable NDR Income amounts (6,687)
33,179   Distribution from Non-Domestic Rate Pool credited to
Comprehensive Income and Expenditure Statement 37,645

Page 138

Notes to the Non Domestic Rate Income Account 
www.argyll-bute.gov.uk  ______________________________________________ Page 127 
1. ANALYSIS OF RATEABLE VALUES
2022-23 2023-24
£ £
9,490,265 Industrial and freight transport subjects 11,125,355
74,472,465 Miscellaneous including Telecomms, Rail, Gas and Electricity Companies 87,231,569
Commercial subjects:
13,921,035  Shops 16,202,980
5,773,370  Offices 6,187,070
8,818,450  Hotels, Boarding Houses etc. 13,919,931
1,916,145  Others 2,395,685
114,391,730 Total Rateable Value 137,062,590   
2. NON-DOMESTIC RATE CHARGE 
2022-23 2023-24
Pence Pence
49.8p Rate Per Pound 49.8p
1.3p
Supplementary Rate Per Pound for Properties between £51,000 and
£95,000 1.3p
2.6p Supplementary Rate Per Pound for Properties over £95,000 2.6p 
3. CALCULATION OF RATE CHARGE FOR EACH PROPERTY
The rates charge for each subject is determined by the rateable value placed upon it by the Assessor
multiplied by the Rate per £ announced each year by the Government.

Page 139

Glossary of Terms 
www.argyll-bute.gov.uk  ________________________________________________ Page 140 
Existing Use Value. The market value of a particular
Council property, less the difference between the average
rental income between public and private sector properties. 
Expected Rate of Return on Pension Assets. The
average rate of return, including both income and changes
in fair value but net of scheme expenses, expected over
the remaining life of the related obligation on the actual
assets held by the Scheme. 
Fair Value. This is the price at which an asset could be
exchanged in an arm’s length transaction less any grants
receivable towards the purchase or use of the asset. 
Financial Asset. A right to future economic benefits
controlled by the Council that is represented by cash, an
equity instrument of another entity, a contractual right to
receive cash from another entity or a financial right to
exchange financial instruments under conditions that are
potentially favourable to the Council. 
Financial Instrument. Any contract that gives rise to a
financial asset of one entity and financial liability or equity
instrument of another. 
Financial Instruments Adjustment Account. This holds
the accumulated difference between the financing costs
included in the Income and Expenditure Account and the
accumulated financing costs required in accordance with
regulations to be charged to the General Fund Balance. 
Financial Liability. An obligation to transfer economic
benefits controlled by the Council that is represented by a
contractual obligation to deliver cash or another financial
asset to another entity or a contractual obligation to
exchange financial instruments under conditions which are
potentially unfavourable to the Council. 
Financial Reporting Standard (FRS). Financial Reporting
Standards are issued by the Accounting Standard Board
and define proper accounting practice for a given
transaction or event. 
Fixed Assets. Tangible assets that yield benefits to the
Council and the services it provides for a period of more
than one year. 
Gains/losses on settlements and curtailments. The
result of actions to relieve the Council of liabilities or events
that reduce the expected future service or accrual of
benefits of employees. This is charged or credited to Non
Distributed costs in the Comprehensive Income and
Expenditure Statement. 
General Fund Balance. This contains the net surplus on
the provision of Council services combined with any
balances from previous years and any contributions to
other funds or reserves made during the year.
Group Accounts. The purpose of group accounts is to
show the Council’s interest in organisations and companies
within the Financial Statements. The Council’s shares of
the assets and liabilities of these other entities are shown
in the Group Movement in Reserves Statement,
Comprehensive Income and Expenditure Statement and
Group Balance Sheet. 
Government Grants. Assistance by government and inter-
government agencies and similar bodies, whether local,
national or international, in the form of cash or transfers of
assets to an authority in return for past, or future,
compliance with certain conditions relating to the activities
of the Council. 
Heritage Assets. Assets which are intended to be
preserved in trust for future generations because of their
cultural, environmental and historical associations and are
held by the Council of the maintenance of heritage. 
International Accounting Standards (IAS). International
Accounting Standards are issued by the International
Accounting Standards Board and define proper accounting
practice for a given transaction or event. IAS’s take
precedence over other accounting standards in the
hierarchy of technical accounting standards. 
International Public Sector Accounting Standards
(IPSAS), a set of accounting standards issued by the
IPSAS Board for use by public sector entities around the
world in the preparation of financial statements. 
Impairment. A reduction in the value of fixed or financial
asset below the valuation held on the balance sheet. 
Infrastructure Assets. Fixed assets that are inalienable,
expenditure on which is recoverable only by continued use
of the asset created. Examples of infrastructure assets are
highways and footpaths. 
Intangible Assets. Non-financial assets which do not have
physical substance but are identifiable and are controlled
by the Council. 
Interest Cost (Pensions). The expected increase during
the period in the present value of the scheme liabilities
because the benefits are one period closer to settlement. 
Inventories. Inventories may comprise the following:
goods or other assets purchased for re-sale; consumable
stores; raw materials and components purchased for
incorporation into products for sale; products and services
in intermediate stages of completion; long term contract
balances; and finished goods. 
Liquid Resources. Current asset investments that are
readily disposable by the Council without disrupting its
business and are either readily convertible to known
amounts of cash at or close to the carrying amount, or
traded on the active market.

Page 140

Glossary of Terms 
www.argyll-bute.gov.uk  ________________________________________________ Page 141 
Materiality. Information is included where the information
is of such significance as to justify its inclusion, and
omission or misstatement could, individually or collectively,
influence the decisions or assessments of users made on
the basis of the financial statements. 
National Non-Domestic Rates Pool. All non-domestic
rates collected by Council’s are remitted to the national
pool and, thereafter, distributed to Councils by the Scottish
Government. 
Net Book Value. The amount at which fixed assets are
included in the Balance Sheet, i.e. their historical cost or
current value less cumulative amounts provided for
depreciation. 
Net Realisable Value. The open market value of the asset
in its existing use, or open market value in the case of non-
operational assets, less the expenses to be incurred in
realising the asset. 
Non-Current Assets. Non-current assets are not expected
to be realised within 12 months and are held to provide
future economic benefits to the Council. 
Non-operational assets. Are assets held by the Council
but not directly occupied, used or consumed in the delivery
of services. Examples of non-operational assets are
investment properties and assets that are surplus to
requirements, pending sale or redevelopment. 
Officers’ Remuneration. All sums paid to or receivable by
an employee and sums due by way of expenses
allowances (as far as those sums are subject to UK Income
Tax). 
Operating Leases. A lease other than a finance lease, i.e.
a lease which does not transfer the risks and rewards of
ownership to the lessee. 
Operating Assets. All items which derive from events or
transactions that fall within the ordinary activities of the
Council and which need to be disclosed separately by
virtue of their size or incidence to give fair presentation of
the accounts. 
Past Service Costs (Pensions). The increase in the
present value of the scheme liabilities related to employee
service in prior periods arising in the current period as a
result of the introduction of, or improvement to, retirement
benefits. 
Pensions Reserve. The Pensions Reserve absorbs the
timing differences arising from different arrangements for
accounting for post-employment benefits and for funding
benefits in accordance with statutory provisions. 
Prior Period Adjustments. Those material adjustments
applicable to prior years arising from changes in
accounting policies or from the correction of fundamental
errors. They do not include normal recurring corrections or
adjustments of accounting estimates made in prior years. 
Public Private Partnerships (PPP). Those partnerships
enable the Council to purchase services from the private
sector and pay a fee based on pre-defined output criteria.
The private sector uses this fee to repay loans taken out to
finance the building or refurbishment of the assets. 
Residual Value. The net realisable value of an asset at the
end of its useful life. 
Related Party Transactions. A related party transaction is
the transfer of assets or liabilities, or the performance of
services by, to or for a related party irrespective of whether
a charge is made. 
Renewal and Repairs fund. This contains funds credited
at the Council’s discretion from the General Fund and is
available for use on capital or revenue expenditure on
Council assets. 
Revaluation Reserve. Records unrealised gains arising
since 1 April 2007 from holding fixed assets not yet realised
through sales. 
Service Expenditure Analysis (SEA). An analysis which
groups together expenditure on services within headings or
divisions as defined in the Service Reporting Code of
Practice (SeRCOP). 
Specific Government Grants. These are grants received
from Central Government in respect of a specific purpose
or service. 
Unusable Reserves. Those reserves which hold
unrealised gains and losses where amounts would only
become available to provide services if the assets are sold
and reserves that hold timing differences. 
Usable Reserve. Those reserves which the Council may
use to provide services, subject to the need to maintain a
prudent level of reserves and any statutory limitations on
their use. 
Useful Life. The period over which the Council will derive
benefits from the use of a fixed asset.

Page 141

www.argyll-bute.gov.uk  ________________________________________________ Page 142 
Appendix A 
Trade Union Facility Time Statement 2023-24
This information is published under the Trade Union (Facility Time Publication Requirements)
Regulations 2017
Schedule 2 (Regulation 8) 
1. Relevant union officials
Total number of employees who were relevant union officials during the relevant period.
Number of employees who were relevant union
officials during the relevant period
Full time equivalent
employee number
Central Function 21 20.8
Education Function 7 7
Note: The headcount figure for relevant union officials includes all stewards and school-based reps who are elected by
their peers to provide first line support for members.
2. Percentage of time spent on facility time
Number of employees who were relevant union officials employed during the relevant period spent who spent 0%, 1%-
50%, 51% - 99% or 100% of their working hours on facility time.
Percentage of time Number of employees  
Central Function Education Function
0% 0 3
1% - 50% 19 2
51% - 99% 2 2
100% 0 0

Page 142

www.argyll-bute.gov.uk  ________________________________________________ Page 143 
3. Percentage of pay bill spent on facility time
The percentage of the total pay bill spent on paying employees who were relevant union officials for facility time
during the relevant period.  
Central
Function
Education
Function
The total cost of facility time £171,701 £71,016
The total pay bill (Finance figures) £123,318,713 £64,175,618
The percentage of the total pay bill
spent on facility time 0.14% 0.11%
4. Paid Trade Union activities 
Percentage of total paid facility time hours spent by employees who were relevant union officials during the relevant
period on paid trade union activities.  
Central
Function
Education
Function
Time spent on paid trade union activities as
percentage of total paid facility time hours
calculated as:
(total hours spent on paid trade union activities
by relevant union officials during the relevant
period ÷ total paid facility time hours) x 100
0% 0%