Democracy Spraffa

Agenda reports pack

Argyll and Bute Council · 5 September 2024
Back to Audit and Scrutiny Committee — 5 September 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD
29 August 2024 
NOTICE OF MEETING 
A meeting of the AUDIT AND SCRUTINY COMMITTEE will be held BY MICROSOFT TEAMS on
THURSDAY, 5 SEPTEMBER 2024 at 10:30 AM, which you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES 
2. DECLARATIONS OF INTEREST 
3. MINUTE OF PREVIOUS MEETING OF THE AUDIT AND SCRUTINY COMMITTEE,
HELD ON 13 JUNE 2024 (Pages 3 - 8) 
AUDIT ITEMS 
4. INTERNAL AUDIT AND COUNTER FRAUD SUMMARY OF ACTIVITIES (Pages 9 -
18)  
Report by Chief Internal Auditor 
5. INTERNAL AND EXTERNAL AUDIT REPORT FOLLOW UP 2024-25 (Pages 19 -
32)  
Report by Chief Internal Auditor 
6. INTERNAL AUDIT REPORTS TO AUDIT AND SCRUTINY COMMITTEE 2024/2025
(Pages 33 - 76)  
Report by Chief Internal Auditor 
• School Funds and Management of School Funds 
• Education Maintenance Allowance
• Adult Support and Protection (HSCP) 
SCRUTINY ITEMS 
7. INTERNAL AUDIT - ANNUAL SELF-ASSESSMENT (Pages 77 - 80)  
Report by Chief Internal Auditor
Public Document Pack

Page 2

8. CORPORATE COMPLAINTS - ANNUAL REPORT 2023-24 (Pages 81 - 120)  
Report by Executive Director with responsibility for Legal and Regulatory Support 
9. INFORMATION REQUESTS - ANNUAL REPORT 2023-24 (Pages 121 - 130)  
Report by Executive Director with responsibility for Legal and Regulatory Support 
10. AUDIT AND SCRUTINY COMMITTEE ANNUAL REPORT 2023/24 (Pages 131 -
140)  
Report by Chair 
11. STRATEGIC RISK ASSURANCE MAPPING (Pages 141 - 158)  
Report by Chief Internal Auditor 
12. STRATEGIC RISK REGISTER (Pages 159 - 162)  
Report by Chief Executive 
13. EXTERNAL AUDIT PROGRESS REPORT (Pages 163 - 172)  
Report by Forvis Mazars 
14. SCRUTINY - ESTABLISHMENT OF A PANEL FOR THE REVIEW 2024-25 (Pages
173 - 176)  
Report by Chief Internal Auditor 
15. WORKPLAN (Pages 177 - 180)  
For noting and updating 
Audit and Scrutiny Committee 
Janice Wason Hall (Chair) Councillor Daniel Hampsey
Councillor Graham Hardie Councillor Fiona Howard
Councillor Reeni Kennedy-Boyle Councillor Gary Mulvaney (Vice-Chair)
Councillor Andrew Vennard   
Shona Barton, Governance Manager 
Contact: Lynsey Innis, Senior Committee Assistant  Tel:  01546 604338

Page 3

MINUTES of MEETING of AUDIT AND SCRUTINY COMMITTEE held BY MICROSOFT TEAMS 
on THURSDAY, 13 JUNE 2024 
Present: Janice Wason Hall (Chair) 
Councillor Daniel Hampsey
Councillor Graham Hardie
Councillor Fiona Howard 
Councillor Reeni Kennedy-Boyle
Councillor Gary Mulvaney
Councillor Andrew Vennard 
Attending: Anne Blue, Head of Financial Services
Jane Fowler, Head of Customer Support Services
Paul MacAskill, Chief Internal Auditor
Shona Barton, Governance Manager
Morag Cupples, Finance Manager
Jennifer Coyle, Senior HR Business Partner
Mhairi Weldon, Senior Audit Assistant
Mark Outterside, Director, Mazars LLP
Gregory Odour, Engagement Manager, Mazars LLP 
1. APOLOGIES 
The Chair welcomed everyone to the meeting. 
There were no apologies for absence intimated. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest intimated. 
3. MINUTE OF PREVIOUS MEETING OF THE AUDIT AND SCRUTINY
COMMITTEE, HELD ON 14 MARCH 2024 
The Minute of the previous meeting of the Audit and Scrutiny Committee, held on 14
March 2024 was approved as a correct record. 
4. INTERNAL AUDIT AND COUNTER FRAUD SUMMARY OF ACTIVITIES 
The Committee gave consideration to a report providing a summary of Internal Audit
activity and progress during quarter one of 2024/25 against the following areas: 
Audits Completed 
• Freedom of Information (FOI)
• Client Funds Progress Review
• Financial Ledger
• Scottish Social Services Council (SSSC) Registration
• Learning and Disability Care Packages
• Cloud Based Computer Services 
Audits in Planning/in progress 
• Education Maintenance Allowance
Page 3 Agenda Item 3

Page 4

• SPT Annual Claim 
The report also provided information on the work carried out by the Counter Fraud Team
(CFT); the continuous monitoring programme and the progress of work carried out as a
result of information received from the National Fraud Initiative (NFI). 
Decision 
The Audit and Scrutiny Committee reviewed and endorsed the Summary of Activities
report. 
(Reference:  Report by Chief Internal Auditor, dated 13 June 2024, submitted) 
5. INTERNAL AND EXTERNAL AUDIT REPORT FOLLOW UP 2023-24 
Consideration was given to a report which provided an update on all open actions as at 31
March 2024 including information on actions where the agreed implementation date had
been rescheduled. 
Decision 
The Audit and Scrutiny Committee endorsed the contents of the report.   
(Reference:  Report by Chief Internal Auditor, dated 13 June 2024, submitted) 
6. INTERNAL AUDIT - ANNUAL REPORT 2023/24 
The Committee gave consideration to a report which outlined the work undertaken by
Internal Audit in respect of the Annual Audit Plan 2023/24 and advised of the contents of
the Chief Internal Auditor’s (CIA) independent annual opinion on the effectiveness of the
Council’s risk management, internal control and governance processes.   
The Chair, on behalf of the Committee, took the opportunity to recognise the volume of
work undertaken by the Internal Audit team and thanked them for their continued hard
work and support.   
Decision 
The Audit and Scrutiny Committee endorsed the content of the report and the associated
annual opinion of the Chief Internal Auditor. 
(Reference:  Report by Chief Internal Auditor, dated 13 June 2024, submitted) 
Councillor Hampsey joined the meeting during discussions of agenda item 6 (Internal
Audit – Annual Report 2023/24)
.
7. STATEMENT OF GOVERNANCE AND INTERNAL CONTROL 
Consideration was given to a report which advised that the statement of governance and
internal control for 2022/23 had been reviewed and updated which allowed the Council to
include a statement of governance and internal control in the Annual Accounts for
2023/24.  The draft Statement of Governance and Internal Control 2023/24 was presented
as Appendix 1 to the report.  
Page 4

Page 5

Decision 
The Audit and Scrutiny Committee considered and approved the draft Statement of
Governance and Internal Control for 2023/24. 
(Reference:  Report by Executive Director with responsibility for Legal and Regulatory
Support, dated 13 June 2024, submitted) 
8. EXTERNAL AUDIT - ANNUAL AUDIT PLAN, YEAR ENDING 31 MARCH
2024 
The Committee gave consideration to a report which presented the Audit Strategy
Memorandum for Argyll and Bute Council for the year ending 31 March 2024.  The report
provided a summary of the audit approach taken by external auditors, Mazars LLP and
highlighted significant audit risks and areas of key judgements. 
Discussion was had in relation to the delays experienced in the last year, particularly in
relation to meeting statutory deadlines.  The concerns of Members were noted with Mr
Outterside and Mr Odour confirming arrangements are in place to ensure that timescales
are more aligned to the statutory deadlines going forward.   
Decision 
The Audit and Scrutiny Committee considered and noted the contents of the report. 
(Reference:  Report by Mazars LLP, submitted) 
9. LOCAL GOVERNMENT BENCHMARKING FRAMEWORK (LGBF): 2022/23 
Consideration was given to a report which provided a high level summary of Argyll and
Bute Council’s performance as reported in the Local Government Benchmarking
Framework (LGBF) data.  Information on the work being carried out as part of the wider
Performance Excellence Project was also provided. 
Decision 
The Audit and Scrutiny Committee:- 
1. considered the contents of the report and noted the trend of net improvement across
the Council; and 
2. noted the ongoing work being carried out as part of the wider Performance Excellence
Project. 
(Reference:  Report by Executive Director with responsibility for Customer Support
Services, dated 17 May 2024, submitted) 
10. UNAUDITED FINANCIAL ACCOUNTS 
The Committee gave consideration to a report which provided an overview of the
unaudited annual accounts for 2023-24.  The report also provided a summary of the
significant movements from 2022-23 and the revenue outturn for 2023-24.  It was noted
Page 5

Page 6

that the Council would be asked to approve the Unaudited Annual Accounts for 2023-24
for issue. 
Decision 
The Audit and Scrutiny Committee considered the Unaudited Annual Accounts for the
year ended 31 March 2024. 
(Reference:  Report by Section 95 Officer, dated 13 June 2024, submitted) 
11. WORKPLAN 
In order to facilitate forward planning of reports to the Audit and Scrutiny Committee,
Members considered the outline Audit and Scrutiny workplan. 
Decision 
The Audit and Scrutiny Committee agreed to note the outline workplan. 
(Reference:  Audit and Scrutiny Workplan, dated 13 June 2024, submitted) 
12. INTERNAL AUDIT REPORTS TO AUDIT AND SCRUTINY COMMITTEE
2023/2024 
(a) Covering Report and Internal Audit Reports 
Consideration was given to a report containing the action plans in relation to the
following 5 audits:- 
• Financial Ledger
• Learning and Physical Disability Care Packages
• Scottish Social Services Council (SSSC) Registration
• Freedom of Information Requests
• Cloud Based Computer Systems 
Decision 
The Audit and Scrutiny Committee reviewed and endorsed the summary report and
detail within each individual report. 
(Reference:  Report by Chief Internal Auditor, dated 13 June 2024, submitted) 
The Committee resolved in terms of Section 50(A)(4) of the Local Government (Scotland)
Act 1973, to exclude the press and public for the following item of business on the
grounds that it was likely to involve the disclosure of exempt information as defined in
Paragraph 6 of Part 1 of Schedule 7A to the Local Government (Scotland) Act 1973.   
(b) Internal Audit Report 
The Committee gave consideration to an internal audit report on the Client Funds
Progress review. 
Decision 
Page 6

Page 7

The Audit and Scrutiny Committee reviewed and endorsed the report. 
(Reference:  Report by Chief Internal Auditor, submitted) 
Page 7

Page 8

This page is intentionally left blank

Page 9

ARGYLL AND BUTE COUNCIL  AUDIT & SCRUTINY COMMITTEE   
FINANCIAL SERVICES  5 SEPTEMBER 2024  
INTERNAL AUDIT AND COUNTER FRAUD SUMMARY OF ACTIVITIES 
1. SUMMARY  
1.1 The objective of the report is to provide the Audit and Scrutiny Committee (the
Committee) with a summary of Internal Audit activity and progress during quarter
four of 2024/25.  
1.2 Core activities together with a progress update statement are shown below: 
• 2024/25 Audit Plan progress: The plan is progressing as normal and subject
to any unplanned absences or changes to resources the plan currently on track. 
• 2024/25 Individual Audits undertaken: Three audits have been completed
during the period, 1 has been assessed as providing high assurance, 1
substantial assurance and 1 reasonable assurance. (Where HSCP and
LiveArgyll Audits are included, these are provided for information only). 
• Scrutiny: Planned work for 2024/25 has been agreed in relation to the Council’s
Complaints processes. A report outlining the approach proposed will be
presented to the Committee for its consideration. It is anticipated that work in
this area will commence in October 2024. 
• Counter Fraud: The Counter Fraud Team (CFT) is continuing to rebill council
tax accounts and recovery of funds is underway.  All other aspects and referrals
are being considered, investigated and evaluated and the Counter Fraud Team
remain vigilant to protect our public purse. The established CFT team member
is on secondment to Housing for career and personal development for a two
year period.  The CFT have obtained a member of staff, again on secondment
for the same time period. The team lead is currently progressing through year
2 of a Master in Accountancy course.   
• Continuous Monitoring Programme Testing: A number of auditable units are
subject to continuous testing. There have been no new issues which we have
identified this quarter. 
• Performance indicators: Current status is green / on track.  
2. RECOMMENDATIONS  
2.1 To review and endorse the Summary of Activities report.   
Page 9 Agenda Item 4

Page 10

3. DETAIL  
3.1 Three audits have been completed since the previous Committee in June 2024.
In addition, a further two verification audits were undertaken which are detailed
in section 5 of the report 
Audits Completed 
• SPT Annual Claim – See section 3.8 for further details
• Education Maintenance Allowance (EMA)
• School Funds and Management of School Funds 
• Adult Support and Protection (HSCP)
• Local Government Benchmarking Framework – See section 3.7 for further
details 
Audits in Planning / in Progress
reported to a future meeting of the Committee. 
• Community Education
• Oban Airport
• Bridges Asset Management Plan and Inspection Regime
• IR 35 Compliance – Off Payroll work
• NDR 
3.2 In addition to those already in progress, indicative audits planned for Q2 2024/25
are: 
• Data Security & Information Security
• IT Risk Register and Mitigation Processes 
2024/25 Audit Plan  
3.3 • Work is ongoing and is currently on track at this point in time.
• A request has been made by senior management to cancel the planned
review of ‘New Roads and Street Works Coordination’ as a recent exercise,
as we understand, has been undertaken in this area. This will be noted as an
amendment to the approved plan for 2024/25. 
Scrutiny  
3.4 It was agreed by the Committee that the chosen subject area for the 2024/25
scrutiny review would be on the Council’s complaints process. A report will be
prepared for September 2024 outlining the suggested approach and appointment
of the Panel to undertake this work. In terms of developing the skills required within
the wider Committee membership, the former Chairperson, Martin Caldwell has
offered to assist in this process. This will be particularly useful for those new to the
Committee but also increasing the resilience of the Committee to have suitably
experienced Panel members. Officer input will be provided as required and
consistent with previous scrutiny reviews undertaken. 
Page 10

Page 11

Counter Fraud  
3.5 The CFT is progressing well with both team members fully CIPFA accredited fraud
investigators. The current investigator has taken on a 2 year secondment to empty
homes for further skills development.  The investigators post was filled again on a
secondment basis.  The new member of staff will undertake the above CIPFA
accreditation and is booked onto this course commencing in the latter half of 2024.
Both team members will revert to substantive post circa sept 2025. 
Continued routine work is still progressing to track the full income recovered from
the team’s work, however, based on the amount of additional billing, even
accounting for a degree of non-recovery, the indications are that the team are still
exceeding their target. In addition, the team are raising awareness of the Council’s
zero tolerance to fraud and this will help act as a deterrent to fraud being
perpetrated in the first place. 
Visits are planned for the local areas including Helensburgh, Rhu, Garelochead
and Tarbert in line with referrals and proactive work.  Both officers continue to be
proactive and make visits when necessary. 
The team also aim to visit some of the more rural islands and areas to follow up on
leads and are working closely with other council departments to assist in fraud
awareness. 
The CFT continue to link in with Debt Recovery and assist where necessary to
trace persons and open communication to long term debts for recovery. Several
cases have resulted in rebilling. 
Second homes review is playing a larger role in the CFT team’s investigations with
several claims already adjusted.  This will remain a proactive area. 
The team now have an established referral system in place from council tax teams
and the CFT have already liaised with this team going forward into 2024 for the
review of the second and holiday home tax changes.  The information already
shared in the short space of time has resulted in rebilling and adjustments of
accounts.  Together we aim to keep accurate records and update accounts where
error or missing information is held. This approach will continue as the method of
collaborative and interdepartmental working has been helpful. 
The CFT continue to work closely with the empty homes team to support each
other in our remits.  Work and communication between each department is key in
identifying and finding appropriate solutions to enable empty homes to return to
residency or open market. 
The NFI exercise continues to be a routine work area for the CFT.  The 2022/23
exercise is now closed and the results are located within this report. The next
exercise will likely commence soon with data uploads likely to be submitted by the
end of 2024. 
Since the inception of the CFT a total of £1,152,747 has been rebilled and
£850,000 has been recovered. A recovery percentage of 74% has been achieved
at the last review of the figures. 
Page 11

Page 12

Additional Updates from Quarter One  
3.6 Staff continue to work from home or on a hybrid approach and this has proved to
be successful, where on-site visits have been required due to the specific nature of
the audit work, these have been undertaken.  
3.7 A sample of data in respect of the Statutory Performance Indicators (SPI’s) that are
required to be returned by councils as part of the Local Government Benchmarking
Framework (LGBF) must be reviewed by Internal Audit for submission to the
Improvement Service by 31 August each year.  Internal audit carry out this work in
collaboration with colleagues in performance management.  Internal Audit was
provided with the full set of data from which to select indicators for review on 21
June and as large variances were reported in ‘Teachers – Sickness Absence –
including Covid’, ‘Sport and Leisure Management’, ‘Use of Libraries’ and ‘Museum
Services’ these indicators were selected for review.  ‘Other Local Government
Employees – Sickness Absence – including Covid’ was also reviewed alongside
Teachers data due to large numbers involved.  Errors were identified during the
course of the review and amended by the relevant officers.  The pro-forma has
been updated to reflect the correct figures for submission to the Improvement
Service. 
The Improvement Service has now published its National Benchmarking Overview
Report 2022-23 providing a high-level analysis of the performance of councils both
during 2022-23 and over the longer-term.  It recognises the efforts and
achievements delivered across local government and sets out the challenges
facing councils in the context of current funding and workforce pressures, growing
demand and ongoing impacts from the Covid pandemic and cost-of-living crisis.  
The Accounts Commission reinforce the importance of the LGBF in delivering best
value and effective and transparent reporting of performance.  In a recent blog
entitled “Benchmarking and good public performance reporting matter”, they state
that the report indicates that “the pace of improvement in councils is slowing, with
2022-23 the first year that the rate of decline in indicators has overtaken the rate of
improvement.  This is against a backdrop of growing financial, demand and
workforce pressures”.  It is expected that councils continue to use the LGBF as
part of their approach to self-evaluation and performance reporting using the
underlying principles of transparency, comparison, trends, driving decision-making
and effective scrutiny. 
3.8 The Strathclyde Concessionary Travel Scheme (SCTS) is founded on the
provision of the Transport Act 1985, which allows authorities to make
concessionary travel schemes in certain circumstances.  The SCTS is
administered by Strathclyde Partnership for Transport (SPT) on behalf of the
SCTS Joint Committee consisting of 12 local authorities to issue travel cards which
entitles the holder to discounted travel by reason of age or disability, and provide
reimbursement of fare reductions on rail, subway and ferry services.  Argyll and
Bute Council operates two ferry routes that qualify for concessionary fares within
the SCTS.  Internal Audit are required to provide a certificate of accuracy on an
annual basis to confirm that the details pertaining to the number of concessionary
passengers carried and the equivalent standard fares are consistent with the
quarterly claims for reimbursement of the difference between the concessionary
fare charged and the standard fare.  The data and supporting information for
quarter 4 2023/24 claim was provided to Internal Audit for review and found to
provide an accurate representation of the number of passengers and value of fares
charged, and the reimbursement value was found to have been calculated in
Page 12

Page 13

accordance with the SCTS requirements.  The certificate of accuracy was
therefore issued on 27 May 2024.  
3.9 The Council has entered a ten-year programme to deliver the Rural Growth Deal
(RGD) for Argyll and Bute.  The Council, as the accountable body for this
programme is required to allocate and account for distribution of the funding to
partners, third parties and other bodies in accordance with the approved
governance arrangements.  The Council’s Chief Internal Auditor has been
appointed to coordinate audit activity throughout the programme, this will include
liaison with partner auditors to obtain annual confirmation of regular and planned
reviews of grant funded activities and a specific review of RGD within the
Council’s Annual Audit Plan at least every two years.  Discussions regarding the
audit input required have taken place and the first review will be included within
the 2025/26 Internal Audit Plan. We will closely monitor the additional work
associated with this appointment going forward and determine whether
additional resources may be required.  
3.10 Our work as the contracted Internal Auditors for the HSCP has been progressing
well and priority has been given in this area given the availability of staff and we
hope to complete this work shortly. We will continue to monitor progress to the
HSCP’s Audit and Risk Committee in relation to the implementation of
recommendations made in previous reports. 
3.11 Internal Audit staff continue to increase their skills and ultimately aim to complete
appropriate professional qualifications at the end of their training programmes.
Internal Audit have two staff members who are undertaking formal professional
training; training is at differing stages but is progressing as expected at this time.
The aim is to develop and retain professional staff on the completion of the
qualifications and increase resilience within the service. 
Continuous Monitoring  
3.12 Our continuous monitoring programme is generally focused on transactional type
activity. Standard audit tests are applied which are relevant to each auditable unit.
Control design tests look at whether the controls in place adequately address the
potential risk event. There have been no new findings within the quarter that
require to be reported. 
Table 2: Continuous Monitoring Findings 
Auditable
Area
Areas Tested Issues Identified Management comment /
action  
No issues identified. 
3.13 A follow up process is in place whereby management are advised of continuous
monitoring findings and, where appropriate, requested to take remedial action. 
There are currently no outstanding follow-up points arising from previous testing. 
Due to the volume of continuous monitoring tests carried out the decision was
made to report by exception only.      
Page 13

Page 14

National Reports  
3.14 A follow up process for national reports is in place whereby management are
advised of national reports published and asked to confirm what, if any, action is
planned as a result of the report.  Table 2 details the national reports issued during
quarter four of 2023/24 and quarter one of 2024/25 due to be reported in quarter
one 2024/25.   
Table 3: National Reports 
National
Report
Issued To Detail Management response/ Action
taken
Integration
Joint Boards’
Finance and
Performance
2024
Chief
Officer/Chief
Finance
Officer
Community health
and social care faces
unprecedented
pressures and
financial uncertainty.
This report makes several
recommendations that will be
reviewed in detail to consider actions
to be taken to address them.  A
summary paper will be prepared and
considered by the IJB’s Senior
Leadership Team, Audit and Risk
Committee and Finance and policy
Committee. 
National Fraud Initiative (NFI)  
3.15 NFI data matching involves comparing computer records held by one body against
other computer records held by the same or another body to identify potentially
fraudulent claims and payments to be identified.  Note though that the inclusion of
personal data within a data matching exercise does not mean that any specific
individual is under suspicion. Where a match is found it indicates that there may be
an inconsistency which requires further investigation. No assumption can be made
as to whether there is fraud, error or other explanation until an investigation is
carried out.  A reminder process is in place to ensure that matches are reviewed
on a timely basis.  
3.16 The current NFI exercise has been completed and results are being compiled by
Audit Scotland.  Any follow up matches will be addressed if necessary.
This exercise was conducted throughout the year by officers and matches checked
and closed accordingly.  NFI provided additional data releases over the course of
the exercise and matches are addressed when these become available.  
The NFI matches are detailed below. The CFT are reviewing the information
received from the NFI matching service, work has commenced to follow these up
locally.  Existing users have been reviewed and new users added where
requested, all users have been informed that matches are available for review and
progress will be monitored monthly by the Counter Fraud team and reported
quarterly to the Audit and Scrutiny Committee.
New HMRC data has been uploaded and released back to us, and teams have
been contacted to start matching this data.   
Table 4: National Fraud Initiative Progress at 29/07/2024
Page 14

Page 15

Operational
Area
Total
Matches
Recommended/Very
High / High/Medium
Risk Matches
Matches
Complete 
*
WIP
Match Description
CT to Elect
Register 
2155 0 2155 0 CT records to Electoral
Register/ other data sets to
ensure discount awarded
to only those living alone
aged over 18, taking into
account disregarded
occupants.  (CT to other
Datasets will not be
progressed further due to
poor quality data)
CT rising
18s 
402 0 402 0
CT to HMRC
Household
Composition
935 0 38 0
Housing
Benefits
21 11 20 0 HB records to records in
other authorities / other
datasets including student
loans, payroll and pensions
to identify undeclared
income and capital.
Payroll 143 2 140 0 Payroll records to other
datasets including other
payrolls and pensions to
ensure employee is not
receiving additional
income.
Blue Badges 238 204 238 0 Blue badge records to
DWP data to identify
deceased claimant with
valid badge.
Housing
Waiting list
233 214 233 0 Housing waiting list
records to other
organisations HBCTR and
tenant data to identify
undisclosed changes in
circs or false info.
Council Tax
Reduction
307 157 278 0 CTR records with records
in other authorities / other
datasets including; student
loans, payroll and pensions
to identify undeclared
income and capital
Creditors 589 0 33 0 Analyses Creditors data to
identify possible duplicate
vendors and payments,
VAT errors or fraud and
multiple vendors sharing a
bank account.
Procurement 38 0 38 0 Payroll records to
Companies House and
creditors’ data to identify
employees who appear to
have a personal interest in
a company that the
authority has traded with.
Business
Rates
214 0 187 0 Business rates records
within and between
authorities to identify
those fraudulently claiming
small business bonus
scheme and grants 
* Work in Progress 
Page 15

Page 16

Overall Summary of Matches 
Matches
Complete
Work In
Progress
Cleared Frauds Errors Total
Value 
£
Recovering Recovering
Value 
£ 
3876  0 3783 0 93 60,450 0 0 
Internal Audit Development  
3.17 The table below details progress against the action points in our Internal Audit
development plan. 
Table 5: Internal Audit Development Key Actions: updated 31/03/24. 
Area For
Improvement
Agreed Action Progress
Update
Timescale
Review Continuous
Monitoring
Programme
Continuous monitoring tests will be
reviewed following audit of Debt
recovery to assess value of existing
tests carried out. 
Consider adding test to review date
taken to process invoices from date of
receipt within the Council (not at
Creditors)
In progress October
2024
Update internal audit
report template to
include key audit
milestones.
A table will be added to the internal
audit report template to provide
readers with the planned and actual
reporting dates, this will allow better
monitoring of any delays in responses
which has been requested by DMT.
Completed and
will be used for
internal audit
reports issued
2024-25
onwards
Completed 
3.18 Internal Audit scorecard data provided below are aligned to those for internal audit
in the Financial Services service plan.  All indicators are shown as currently being
on track.   
Page 16

Page 17

Table 6: Internal Audit Team Scorecard  
Internal Audit Team Scorecard 2024– 25 – FQ1 24/25 (as at June 2024)
BO115 We Are Efficient and Cost Effective    
Internal Audit Level of Satisfaction
Actual  100% G 
Target 80%
Review of Strategic Risk register
Status On Track G 
Target On Track
Percentage of audit plan completed
Status 100% G 
Target 80%
Percentage of audit recommendations accepted by
management
Actual  100%
G
Target 100% 
4 CONCLUSION  
4.1 The 2024/25 audit plan is progressing as anticipated at this stage in the year,
together with the Counter Fraud Team continuing with visits and pro-active work
throughout Argyll and Bute. Resource has been focused on the HSCP contract in
this last quarter.  
5 IMPLICATIONS
5.1 Policy – Internal Audit continues to adopt a risk based approach to activity
5.2 Financial –None
5.3 Legal –None
5.4 HR – None
5.5 Fairer Scotland Duty – None
5.5.1 Equalities – protected characteristics – None
5.5.2 Socio-Economic Duty – None
5.5.3 Islands – None
5.6 Climate Change – None 
5.7 Risk – None
5.8 Customer Service – None
5.9 The Rights of the Child (UNCRC) – None 
For further information please contact Internal Audit (01546 604108)
Paul Macaskill
Chief Internal Auditor
5 September 2024
Page 17

Page 18

This page is intentionally left blank

Page 19

ARGYLL AND BUTE COUNCIL  AUDIT AND SCRUTINY COMMITTEE                                                            
FINANCIAL SERVICES  5 September 2024 
INTERNAL AND EXTERNAL AUDIT REPORT FOLLOW UP 2024-25 
1.0 INTRODUCTION 
1.1 Internal and external audit reports include an action plan with a
management response establishing the agreed action, timescale and
responsible officer. Internal Audit record these in a database and, on a
monthly basis, follow them up to ensure they are being progressed. 
1.2 This report updates the committee on all open actions as at 30 June 2024
including information on actions where the agreed implementation date
has been rescheduled.   
2.0 RECOMMENDATIONS 
2.1 To endorse the contents of the report. 
3.0 DETAIL 
3.1 The two tables below provide a numerical summary of open audit actions
with a split between actions due by and due after 30 June 2024. 
3.2 Appendix 1 provides further detail on actions that have been delayed and
rescheduled, no response or evidence required. 
Page 19 Agenda Item 5

Page 20

Table 1 - Actions Due by 30 June 2024
SMT/Service
Complete
Delayed/
Reschedule
d No
Response
Evidence
Required
Total
Internal Audit
DH – Commercial Services 1 1 0 0 2
DH – Legal & Regulatory Support 1 0 0 0 1
KF – Customer Support Services 2 2 0 0 4
KF – Development & Economic Growth 0 2 0 0 2
KF – Roads & Infrastructure Services 0 4 0 0 4
H&SCP (IJB) – Strategic Planning & Performance 0 1 0 0 1
H&SCP (SW) – Adult Services (Mental Health Learning
Disability, Addictions & Lifelong Conditions)
1 2 0 0 3
H&SCP (SW) – Adult Services (Older Adults & Community
Hospitals
0 1 0 0 1
H&SCP (SW) – Strategic Planning & Performance 0 4 0 0 4
H&SCP (SW) – Finance & Transformation 1 1 0 0 2
External Audit
Nil     
TOTAL 6 18 0 0 24 
Table 2 – Actions due after 30 June 2024
SMT/Service
Complete
Delayed/
Rescheduled
No Response
On Course
Evidence
Required
Total
Internal Audit
DH – Commercial Services 5 0 0 1 0 6
DH – Legal & Regulatory Support 0 0 0 3 0 3
DH – Education Performance & Improvement 0 0 0 1 0 1
DH – Education Wellbeing, Inclusion and Achievement 0 0 0 1 0 1
KF – Customer Support Services 0 0 0 5 0 5
KF – Development & Economic Growth 0 2 0 3 0 5
KF – Roads & Infrastructure Services 1 0 0 14 0 15
KF – Financial Services 1 0 0 11 0 12
H&SCP (IJB) – Strategic Planning & Performance 1 0 0 3 0 4
H&SCP (IJB) – Finance & Transformation 0 0 0 2 0 2
H&SCP (IJB) – Adult Services (Older Adults & Community
Hospitals
0 0 0 1 0 1
H&SCP (SW) – Adult Services (Older Adults & Community
Hospitals
0 0 0 2 0 2
H&SCP (SW) – Adult Services (Mental Health Learning
Disability, Addictions & Lifelong Conditions)
0 0 0 4 0 4
H&SCP (SW) – Children and Families and Criminal Justice 0 2 0 0 0 2
External Audit
Nil      
TOTAL 8 4 0 51 0 63
Page 20

Page 21

4.0 CONCLUSION 
4.1 Satisfactory progress continues to be made implementing audit actions. 
5.0 IMPLICATIONS 
5.1 Policy – None 
5.2 Financial – None 
5.3 Legal – None 
5.4 HR – None 
5.5 Fairer Scotland Duty – None 
5.5.1 Equalities – protected characteristics – None
5.5.2 Socio-economic Duty – None
5.5.3 Islands – None 
5.6 Climate Change – None 
5.7 Risk – None
5.8 Customer Service – None
5.9 The Rights of the Child (UNCRC) – None 
Paul MacAskill
Chief Internal Auditor
5 September 2024                                                  
For further information contact: Paul MacAskill, 01546 604108
Paul.macaskill@argyll-bute.gov.uk 
APPENDICES
Appendix 1 – Action Plan Points - Delayed & Rescheduled/No Response
Page 21

Page 22

Appendix 1 - Action Plan Points Delayed & Rescheduled, No Response or Evidence Required 
Action Plan Points Due by 30 June 2024 
Service, Report, Plan no. & Finding Agreed Action Dates Comment Responsible Officer
LOW
COMMERCIAL SERVICES 
Externally Funded Projects - Rothesay Pavilion 
3. Resources 
Consideration should be given to reviewing the
extensive use of outside contractors and
consultants as opposed to investing in in-house
resources in regard to major capital projects
especially in light of the projected overspend on
the project. 
As part of the End Project Report,
Lessons Learned, a review of the
decision pertaining to project
resourcing will be undertaken, and
recommendations made to Head of
Service with respect to the on-
going efficient resourcing of
projects.  In developing future
projects the Council will continue
to give consideration to the most
efficient resourcing model. 
30/06/2023
30/06/2024
31 Dec 2024 
The completion of Rothesay
Pavilion is well documented
through Council and Policy and
Resources Committee - there is
not yet an End Project Report
because the project has not
reached that stage and will
continue to be unclear until
clarity on partner funding
arrangements are known
(notably Rural Growth Deal
Funding).  This audit action will
be addressed upon completion
of project.  Notwithstanding
this, the wider intention of
reviewing project resourcing
and investing in in-house
resources for major projects will
be a consideration in future
restructuring of Property
Services Team.  Revised date
has been added if project does
not proceed beyond Stage 2A. 
Delayed and Rescheduled 
Project Manager  
Medium
CUSTOMER SUPPORT SERVICES 
Cloud Computing Services 
4. User Revocation 
Finding: for one system reviewed, we found that
systems administrators are not always promptly
informed when users leave or no longer require
The System B Team will promptly
implement a monthly procedure to
identify and deactivate accounts
that have not been used within the
month. 
31/06/2024
30 Sep 2024 
A report has been set up that
lists all system users and the
date they last logged in. The
team are required to check this
on a monthly basis and disable
anyone who hasn’t logged in
within the last month. The team
are currently dealing with the
Systems Support Officer 
Page 22

Page 23

Service, Report, Plan no. & Finding Agreed Action Dates Comment Responsible Officer
access. Termination of network access provides
some comfort where leavers are concerned,
however, this does not prevent users gaining
continued access when transferring to another
service area. 
Recommendation: periodic review of user status
takes  place by service systems administration
to ensure access  to sensitive data is restricted
to those with current and  legitimate service
needs. 
backlog of accounts and staff
shortage will delay this action. 
Delayed and Rescheduled 
Low
CUSTOMER SUPPORT SERVICES 
Equality and Socio-Economic Impact
Assessment 
4. Training 
EqSEIA guidance was issued to employees via a
newsflash and presentations were made to
managers, including a presentation on EqSEIA
and for budget setting savings. 
Webinars and presentations on
EqSEIAs will be run at key times in
the year. 
30/06/2023
31/12/2023
31/03/2024
30/06/2024
30 Nov 2024 
Toolkit development and
training/ guidance materials on
track for a revised date of
November 2024. 
Delayed and Rescheduled 
Head of Customer
Support Services 
Low
DEVELOPMENT & ECONOMIC GROWTH  
Planning 
3. Customer Charter 
Planning have in place a customer charter,
however it was last reviewed in 2012 and
requires to be updated as it does not reflect
current practice. 
The framework document for
2022/23 stated “A review and
update of the Development
Management Customer Service
Charter will also be undertaken
during 2023/24.” 
31/12/2023
31/03/2024
30/06/2024
30 Aug 2024 
Impacted by operational
commitments on staff time.
Draft Charter has now been
produced and subject to
internal discussion with DM
staff. It is still expected to
progress this to completion
during Summer 2024. 
Delayed and Rescheduled 
Development Manager 
Low
DEVELOPMENT & ECONOMIC GROWTH 
Planning
The Planning Performance
Framework for 2022/23 states that
“it is intended to reinitiate Service
31/12/2023
31/03/2024
30/06/2024
31 Oct 2024
Operational commitments on
staff time have prevented this
item being taken forward; the
requirement for customer
Development Manager
Page 23

Page 24

Service, Report, Plan no. & Finding Agreed Action Dates Comment Responsible Officer 
4. Service level Customer User Forums
Customer User Forums have previously been
held regularly however currently customer
forums are not being undertaken. 
level Customer User Forums during
2023/24”. 
engagement is also being
influenced by the emerging
National Planning Improvement
Framework. It is now intended
to hold a User Forum in late
Summer/Autumn 2025 that
meets NPIF requirements. 
Delayed and Rescheduled 
High
ROADS & INFRASTRUCTURE SERVICES 
Burial Records 
1. No Procedure for Records Management
Finding: There is no consistent approach to
updating and managing burial records across
the Service. 
Finding: Private burials on home ground do not
appear to be authorised or registered.  
Finding:  Officers are printing documentation
provided by funeral directors and applicants via
email unnecessarily.    
Finding:  Documentation was missing or could
not be located at the time of the audit visit. 
Recommendation:  A unified approach to
records management should be adopted to
establish consistency and provide resilience
across the service.  Additionally, a sample of
burial records should be periodically checked for
accuracy.  This should be documented in a
procedure note and issued to the relevant
members of staff. 
A unified approach to records
management will be implemented
and documented in a procedure
note.  This will include a
requirement for periodic sample
checking to take place. 
30/06/2023
31/12/2023
31/03/2024
30/06/2024
30 Sep 2024 
Delay due to staff sickness,
works with area offices are
ongoing. 
Delayed and Rescheduled 
Operations Manager,
Roads and
Infrastructure Services 
Medium ROADS & INFRASTRUCTURE SERVICES 
Burial Records
Policies and procedures will be
reviewed and updated if required. 
30/06/2023
31/12/2023
31/03/2024
Policies and procedures are
being finalised at present and
will be reviewed and re-issued
Operations Manager,
Roads and
Infrastructure Services
Page 24

Page 25

Service, Report, Plan no. & Finding Agreed Action Dates Comment Responsible Officer 
2. Review of Policies and Procedures 
Finding: Policies and procedures provided to the
auditor contained no evidence of recent review
or were not dated. 
Recommendation: Policies and procedures
should be subject to periodic review and
updated as required.  Updated documents
should be promptly circulated to staff and
published on the Council’s website where
appropriate. 
These will be re-issued to staff and
published where appropriate. 
30/06/2024
30 Sep 2024 
to staff and published where
appropriate. Procedures will be
reviewed on an annual basis.
Delayed due to officer off ill. 
Delayed and Rescheduled 
Low
ROADS & INFRASTRUCTURE SERVICES 
Burial Records 
5. Additional Functions within BACAS 
Finding: BACAS system has additional
functionality that is not currently utilised to
provide efficiencies. 
Recommendation: Liaise with system provider
and other Local Authorities to establish which
additional features would provide benefits to
the service. 
The service will liaise with the
system provider and other local
authorities to identify useful
additional system functionality and
arrange training for
implementation. 
30/06/2023
31/12/2023
31/03/2024
30/06/2024
30 Sep 2024 
A number of additional
functions are now being
captured in the BACAS,
particularly within the
crematorium operations. 
Delayed and Rescheduled 
Operations Manager,
Roads and
Infrastructure Services 
Low
ROADS & INFRASTRUCTURE SERVICES 
Burial Records 
6. Historical Register Information 
Finding: The Burial and Cremation (Scotland) Act
2016 (The Act) requires information to be
retained electronically although this is not
currently in force it will be at a future date.  The
BACAS system has been partially updated with
historical information recorded in burial
registers, it has not been possible to update
The service will source temporary
assistance to update records
during Summer 2024. 
30/06/2023
31/12/2023
31/03/2024
30/06/2024
31 Dec 2024 
The service will now look to
recruit the temporary
assistance to achieve this audit
action. 
Delayed and Rescheduled 
Business Improvement
Manager 
Page 25

Page 26

Service, Report, Plan no. & Finding Agreed Action Dates Comment Responsible Officer
with all information due to the volume of work
involved.   
Recommendation:  Source temporary additional
resource to update historical burial records on
BACAS. 
Low
STRATEGIC PLANNING AND PERFORMANCE 
Risk Management 
3. Training 
It is noted that there is an outstanding audit
action since June 2021 covering: 
· Training for new members of IJB and Audit 
Committee 
· training for Risk leads 
· maintenance of training records 
Recommendation accepted. A
training programme based upon
the use of the Smartsheet system is
being developed. 
31/12/2023
30/06/2024
31 Dec 2024 
Delayed pending review of
wider partner approach to
ensure consistent messaging
and approach. Delayed until
December 2024 for consistency. 
Delayed and Rescheduled 
Business Improvement
Manager 
VFM
FINANCE/TRANSFORMATION 
Customer Service Centre - H&SCP 
6. Routing of calls to the appropriate channels
Calls for HSPC represent the highest volume of
both calls handled by CSC and transferred to the
Service. The data provided detailing the teams
the calls are transferred to indicates that it may
be more appropriate for properly trained staff
to handle and manage these calls.  Contact
Centre and HSCP should analyse whether it is
more efficient to route certain call types on the
HSCP Golden Number directly to HSCP for them
to manage or that specific issues which require
more specialist or detailed knowledge are dealt
directly by HSCP. 
Provided by key officer The service
will engage in discussions with
CET’s Customer Engagement
Manager to ensure that suitable
arrangements are in place which
maximises efficiency and
effectiveness of the handling of
customer contacts and enquiries
via the HSCP Golden Number. 
30/06/2023
30/09/2023
31/03/2024
30/06/2024
31 Dec 2024 
All social care product reviews
should be completed and
ensure the single point of
contact relationship with the
CSC is operational and working
well before completion.
Progress is being made and
monthly meetings will be held. 
Delayed and Rescheduled 
Business Improvement 
Manager 
Page 26

Page 27

Service, Report, Plan no. & Finding Agreed Action Dates Comment Responsible Officer
Medium
STRATEGIC PLANNING AND PERFORMANCE 
Learning & Physical Disability Care Packages 
1. Policies and Procedures 
Care Assessment policies and procedures are in
place with a number of key documents provided
for review. The documents provided refer
Carefirst. With the implementation of the new
client database recording system – Eclipse these
require to reviewed and updated. 
Policies and procedures to be
updated as part of the Eclipse
Implementation Program. 
30/06/2024
30/09/2024 
Initial Response received,
however, further discussion
requires to be taken between IA
and relevant officer prior to sign
off. 
Delayed and Rescheduled
Head of Strategic
Planning, Performance
and Technology 
Medium
STRATEGIC PLANNING AND PERFORMANCE 
Learning & Physical Disability Care Packages 
2. Induction Pack 
Staff have access to relevant policies and
procedures, including access to relevant
training. All staff should have a session with the
Carefirst/eclipse support team to learn to
navigate their way through the systems. An
induction pack is in the process of being
developed and this will include an introduction
to policies and procedures. 
Incorporate Eclipse Training into
the HSCPs induction program  ·
Facilitate training sessions as part
of the Eclipse Implementation
Program 
30/06/2024
30/09/2024 
Initial Response received,
however, further discussion
requires to be taken between IA
and relevant officer prior to sign
off. 
Delayed and Rescheduled
Head of Strategic
Planning, Performance
and Technology 
Medium
ADULT SERVICES (MENTAL HEALTH LEARNING
DISABILITY, ADDICTIONS & LIFELONG
CONDITIONS/CSWO) 
Learning & Physical Disability Care Packages 
3. Case Notes 
Case notes are maintained on Eclipse, the
replacement client database for Carefirst. It was
noted that case notes were not always
maintained and up to date.
Record keeping session (s) to be
delivered by professional lead   ·
Senior Managers to implement
case note audit within their 
respective services – this should be
linked to individual practitioner 
supervision 
30/06/2024  Extension required to support
manager with progress. 
Delayed and Rescheduled
Senior Managers (Adult
Services) 
Page 27

Page 28

Service, Report, Plan no. & Finding Agreed Action Dates Comment Responsible Officer
Medium
STRATEGIC PLANNING AND PERFORMANCE 
Learning & Physical Disability Care Packages 
4. Client Records 
A previous audit report highlighted the fact that
client records were stored in multiple locations,
including on the Council’s network drive.
Evidence obtained during the audit suggests
that client records are still being maintained in
several locations. A successful pilot project was
run in Mid Argyll transferring all records onto
CIVICA. A proposal has been submitted to roll
this out across all other areas in Argyll. 
Ensure that a standardised and
compliant electronic recording
system is implemented across
HSCP services – this should be
achieved via the Eclipse
Implementation Program. 
30/06/2024  The Scotland wide Social Work
Model Office forms the base
platform for the new Eclipse
Social work interface. Replacing
the need for separate care
assessment policies. The client
record is currently recorded and
stored within the Eclipse Case
Management System. A
business case is being
developed to look at the use of
CIVICA to work in conjunction
with Eclipse providing a single
electronic document
management system for both
health & social care ECM users. 
Delayed & Rescheduled
Head of Strategic
Planning, Performance
and Technology 
Medium
ADULT SERVICES (MENTAL HEALTH LEARNING
DISABILITY, ADDICTIONS & LIFELONG
CONDITIONS/CSWO) 
Learning & Physical Disability Care Packages 
5. Resource Allocation Group 
We were provided with a Terms of Reference
for the “Adult Care Allocation Group (ACAG)”.
We were advised  that this group has been
suspended as it was felt there  was no added
value to having a single ACAG as the  majority of
Learning Disability care packages were already 
over the threshold, and the wider ACAG
members had no  expertise or input in Learning
Disability. In addition, how and where the
decisions on resource allocations are taken and
recorded has not yet been confirmed. 
Develop a Terms of Reference for
the Acute and Complex Care
directorate’s Care Allocation Group
that meets fortnightly and is
chaired by the Head of Service. 
30/06/2024  Extension required to support
manager with progress. 
Delayed and Rescheduled
Head of Adult Services
(Complex & Critical
Care) 
Page 28

Page 29

Medium
STRATEGIC PLANNING AND PERFORMANCE 
Learning & Physical Disability Care Packages 
7. Unmet Need 
Unmet need for Older People Care at Home is
collated by the resources team on a weekly
basis, this is then submitted to Performance and
Improvement Team, and is reported to Scottish
Government. The data for Learning Disability is
not currently recorded formally and not
included in the above. 
Include the data re unmet need for
those under 65 in the weekly
reporting format already in place
for Older People. 
30/06/2024
30/09/2024 
Initial Response received,
however, further discussion
requires to be taken between IA
and relevant officer prior to sign
off. 
Delayed and Rescheduled
Head of Strategic
Planning, Performance
and Technology & Head
of Adult Services
(Health & Community
Care) 
Service, Report, Plan no. & Finding Agreed Action Dates Comment Responsible Officer
Medium
ADULT SERVICES (OLDER ADULTS &
COMMUNITY HOSPITALS) 
Learning & Physical Disability Care Packages 
6. Allocation of Resources 
The large majority of Learning Disability services
are commissioned under the Supported Living
contract and Older People services are
commissioned under Care at Home contract.
There are a few anomalies where some 
providers of Care at Home services are
commissioned to provide support outside of
their normal client group,  however it was found
that priority was given to older peoples services
with Learning Disability clients remaining  on a
waiting list for personal care services. 
Review the Care at Home contract
as a matter of priority to ensure
that there is personal care
provision across the authority for
those under the age of 65 with
complex needs, who do not require
more intensive care such as that
provided via Supported Living. 
30/06/2024
31 Aug 2024 
The contract was unable to be
amended. There is a pilot to
manage unmet personal care
need for those under 65, pilot in
Cowal and take key learning.   
Delayed and Rescheduled 
Head of Adult Services
(Health & Community
Care) & Chief Finance
Officer 
Page 29

Page 30

Action Plan Points due after 30th June 2024 
Service, Report, Plan no. & Finding Agreed Action Dates Comment Responsible Officer
Low
DEVELOPMENT & ECONOMIC GROWTH 
Private Sector Housing Grants & Adaptions 
2. The Scheme of Assistance 
The Councils Scheme of Assistance (SoA) which
was introduced under the duties and powers set
out in the Housing (Scotland) Act 2006, and sets
out the strategy of support for owners to
address properties which are Below Tolerable
Standard (BTS) and in disrepair does not contain
up to date information and should be updated
after the outcome of the national policy review. 
As per Local Housing Strategy
2022-2027  Action Plan;  
The Scheme of Assistance, will be
revised in 2023, after the outcome
of national policy review on
adaptions. 
31/12/2022
30/06/2023
31/03/2024
30/09/2024
30 Dec 2024 
Scheme of Assistance draft
document out for comment to
Housing staff. Target is to put
the new Scheme of Assistance
to the Council for approval by
the end of 2024. 
Delayed and Rescheduled 
Team Lead - Housing
Operations 
Low
DEVELOPMENT & ECONOMIC GROWTH 
Private Sector Housing Grants & Adaptions 
3. Procedure Notes and Shared Documents
While the vast majority of requirements are
included there would be benefit to updating
these to reflect current  working practices,
which have evolved due to hybrid  working
arrangements and the digitalisation of records. 
Consideration should be given to creating a
checklist to ensure consistent application of
processes. 
Procedures and documents will be
reviewed and updated. Checklists
to be drawn up and introduced
when updating the procedures. 
31/12/2022
30/06/2023
31/03/2024
30/09/2024
30 Dec 2024 
Meeting has been held with
HSCP Care and Repair and
Housing Officers (30th May
2024). Final updating of
procedures and documents will
be completed once new
Scheme of Assistance has been
approved by the Council. 
Delayed and Rescheduled 
Team Lead - Housing
Operations 
Medium
CHILDREN AND FAMILIES AND CRIMINAL
JUSTICE 
Scottish Social Services Council (SSSC)
Registration 
4. Supervision Policy 
Develop a social work and social
care supervision policy. 
31/08/2024
30 Sep 2024 
Review of supervision policy
scheduled to take place from
the beginning of August. Unable
to identify time prior to this due
to other competing priorities
with other deadlines such as
complaints, HR disciplinary,
grievance investigation and
Professional Lead -
Social Work 
Page 30

Page 31

Service, Report, Plan no. & Finding Agreed Action Dates Comment Responsible Officer
Finding: The Supervision Policy is dated
November 2011 with no evidence of review or
update, additionally, the requirements in terms
of frequency and duration of supervision
meetings are considered by mangers to be
unrealistic in terms of current available
resources. 
Recommendation: The Supervision Policy be
reviewed and updated to ensure it incorporates
up-to-date needs and requirements of service
delivery. 
annual leave. 
Delayed and Rescheduled 
High
CHILDREN AND FAMILIES AND CRIMINAL
JUSTICE 
Scottish Social Services Council (SSSC)
Registration 
5. Compliance with Supervision Policy 
Finding: evidence of compliance with the
supervision policy was limited and embedded
templates were not being consistently used.
Recommendation: Following review of the
Supervision Policy, Managers should be
reminded of the need to schedule supervision
meetings with employees in advance and retain
records in an appropriate and consistent
format. 
Appropriate documentation will be
provided following development of
social work and social care
supervision policy. 
31/08/2024
31 Oct 2024 
Review of supervision policy
rescheduled for completion by
the end of September. This
action is delayed until October
to allow a period of roll out and
awareness raising for
supervisors of the new policy
and associated documentation. 
Delayed and Rescheduled 
Professional Lead -
Social Work 
Page 31

Page 32

This page is intentionally left blank

Page 33

ARGYLL AND BUTE COUNCIL  AUDIT AND SCRUTINY COMMITTEE 
FINANCIAL SERVICES  05 SEPTEMBER 2024 
INTERNAL AUDIT REPORTS TO AUDIT AND SCRUTINY COMMITTEE 2024/2025 
1. EXECUTIVE SUMMARY 
1.1 There are three audits being reported to the Audit and Scrutiny Committee.     
1.2 The table below provides a summary of the conclusions for the audits performed.
The full reports are included as appendices to this report. 
Audit Name Level of
Assurance
High
Actions
Medium
Actions
Low
Actions
VFM
Actions      
Schools Funds and Management of
School Funds Reasonable 2 5 0 0
Education Maintenance Allowance High 0 0 0 0
Adult Support and Protection (HSCP) Substantial 0 0 1 0 
1.3 Internal Audit provides a level of assurance upon completion of audit work. A
definition for each assurance level is documented in each audit report. 
2. RECOMMENDATIONS 
2.1 Audit and Scrutiny Committee to review and endorse this summary report and the
detail within each individual report. 
3.  DETAIL 
3.1 A high level summary of each completed audit report is noted below: 
School Funds and Management of School Funds: this audit provided a
reasonable level of assurance. This means that internal control, governance and
the management of risk are broadly reliable. However, whilst not displaying a
general trend, there are areas of concern which have been identified where
elements of residual risk or weakness may put some of the system objectives
at risk. Eleven schools were visited in undertaking this review, we found that
school fund management committees were not always in place, constitutions
that were in place were not always up to date, committee members were not
formally appointed, minutes of meetings were not recorded and evidence of
decision-making was limited.  The School Fund Management Circular 1.10 does
not reflect digital working practices nor does it clarify roles and responsibilities
sufficiently to support schools subject to interim management and staffing
arrangements. The Circular is available to all staff, however it is not formally
Page 33 Agenda Item 6

Page 34

communicated, resulting in a lack of awareness of its content, including
instructions and templates to facilitate a consistent approach across all schools. 
Practical training is not currently provided to those involved in the management
of school funds, and whilst a LEON module has been made available, there is
limited knowledge of its existence. Robust processes are in place to manage
funds and maintain income and expenditure records, however, these were not
always followed and do not fully follow the instructions laid out in the Circular. 
Expenditure was authorised in all instances, however some expenditure was
not authorised in compliance with set expenditure limits and documentary
evidence was not always available. Appropriate arrangements were found to be
in place for securing cash and cheques within each school.  An annual
independent audit of school fund accounts had not been arranged in the
majority of schools visited.  There is no process for advising when schools apply
for grants and no corresponding register is maintained.  Of all Argyll and Bute
schools, 26 (32.5%) did not submit an annual Income and Expenditure
Statement for 2022-23, limited checks are carried out to ensure these are
received and there are no spot checks/reviews of individual schools’ processes.     
Education Maintenance Allowance (EMA): this audit provided a high level of
assurance. This means that internal control, governance and the management
of risk are at a high standard. Only marginal elements of residual risk have been
identified with these either being accepted or dealt with.  Appropriate
arrangements are in place to process applications, payments and submit
accurate monthly claims and year-end schedules.  Awards of EMA payments
were made appropriately following submission of the required documentation in
support of their formal application.  All payments and costs incurred were
aligned with details held on the Council’s general ledger and correctly reflected
in the total value requested for reimbursement from Scottish Government in
accordance with the terms and conditions of the offer of grant.  
Adult Support and Protection (HSCP) (For Noting): this audit provided a
substantial level of assurance. This means that internal control, governance and
the management of risk is sound. However, there are minor areas of weakness
which put some system objectives at risk and specific elements of residual risk
that are slightly above an acceptable level and need to be addressed within a
reasonable timescale. Argyll and Bute Adult Support and Protection Partnership
(the Partnership) were required to submit the Improvement Plan by November
2021, to the Link Inspector, demonstrating that it addresses the priority areas
for improvement identified within the report.   A comprehensive improvement
plan was developed in 2021 with the aim of improving activity in health and
social care to make services better for the people who use them.  In addition,
the Partnership were required to respond to a post inspection questionnaire
which was also required to be submitted in November 2021. Both were
submitted within the deadline. Recording and monitoring processes have been
put in place to track progress against the Improvement Plan. Progress against
the Improvement Plan is published and reported.    
4. CONCLUSION 
4.1 Management has accepted each of the reports submitted and have agreed
responses and timescales in the respective action plans. 
5. IMPLICATIONS 
5.1 Policy – None 
Page 34

Page 35

5.2 Financial – None 
5.3 Legal – None 
5.4 HR – None
5.5 Fairer Scotland Duty – None 
5.5.1 Equalities – protected characteristics – None
5.5.2 Socio-economic Duty – None
5.5.3 Islands – None
5.6 Climate Change – None 
5.7 Risk – The implementation of recommendations contained in audit reports may
help mitigate the risk to the Council. 
5.8 Customer Service – None
5.9 The Rights of the Child (UNCRC) – None 
Paul Macaskill
Chief Internal Auditor
5 September 2024 
For further information contact: 
Paul Macaskill, Chief Internal Auditor
Tel:  01546 604108
Email: paul.macaskill@argyll-bute.gov.uk 
APPENDICES 
1. School Funds and Management of School Funds – To follow
2. Education Maintenance Allowance
3. Adult Support and Protection - HSCP
Page 35

Page 36

This page is intentionally left blank

Page 37

Argyll and Bute Council
Internal Audit Report
August 2024
FINAL 
High Medium Low VFM
Number of
Findings
2 5 0 0 
School Funds and
Management of Funds 
Audit Opinion: Reasonable 
Page 37

Page 38

2
Argyll and Bute Council – Internal Audit Report– School Funds & Management of Funds August 2024
Contents 
1. Executive Summary ........................................................................................................................ 3
Introduction ............................................................................................................................................ 3
Background ............................................................................................................................................. 3
Scope ....................................................................................................................................................... 3
Key Dates ................................................................................................................................................ 4
Risks ........................................................................................................................................................ 4
Audit Opinion ......................................................................................................................................... 5
Recommendations ................................................................................................................................. 5
2. Objectives and Summary Assessment ........................................................................................... 5
3. Detailed Findings ............................................................................................................................ 8
Appendix 1 – Action Plan ..................................................................................................................... 15
Appendix 2 – Audit Opinion ................................................................................................................. 19 
Contact Details 
Internal Auditors: Annemarie McLean & Leanne Rennie 
Telephone:  01700 501354 
e-mail:   annemarie.mclean@argyll-bute.go.uk 
www.argyll-bute.gov.uk
Page 38

Page 39

3
Argyll and Bute Council – Internal Audit Report– School Funds & Management of Funds August 2024
1. Executive Summary
Introduction
1. As part of the 2024/25 internal audit plan, approved by the Audit & Scrutiny Committee in
March 2024, we have undertaken an audit of Argyll and Bute Council’s (the Council) system of
internal control and governance in relation to School Funds and Management of Funds.
2. The audit was conducted in accordance with the Public Sector Internal Audit Standards (PSIAS)
with our conclusions based on discussions with council officers and the information available at
the time the fieldwork was performed. The findings outlined in this report are only those which
have come to our attention during the course of our normal audit work and are not necessarily
all the issues which may exist. Appendix 1 to this report includes agreed actions to strengthen
internal control however it is the responsibility of management to determine the extent of the
internal control system appropriate to the Council.
3. The contents of this report have been agreed with the appropriate council officers to confirm
factual accuracy and appreciation is due for the cooperation and assistance received from all
officers over the course of the audit.
Background
4. All Argyll & Bute Schools operate individual school funds for the purpose of controlling monies
raised in relation to local school activities. The normal sources of income are donations, fund
raising activities, contributions from pupils towards school trips, voluntary activities etc.  These
funds are administered and spent for the benefit of the school and do not come within the
budget of, or under the direct administration of the Council. 
5. Section 79 of the Education (Scotland) Act 1980 imposes a duty on the education authority to
administer gifts of property or funds for behalf of any school or other educational establishment
taking into account the wishes or intentions of the donor.  Since the education authority is
responsible for managing funds donated, whether or not they are earmarked for the benefit of a
particular group, it is entitled to instruct that a uniform accounting system or guidelines for such
a system be introduced. As such, the Council have issued the ‘Education Management Circular
1.10’ which sets out instructions to schools in relation to how school funds will be managed. 
6. Within Argyll and Bute there are: 
 65 Primary Schools, 7 of which have a Gaelic unit
 4 2-18 schools
 1 Joint Campus
 1 Special School
Scope 
7. The scope of the audit was to review the process of compliance and conformance to School
Circular 1.10 in relation to the management and control of School Funds. In addition,
identification of any training gaps that may require to be addressed as outlined in the Terms of
Reference agreed with the Head of Education: Performance and Improvement on 31 May 2024. 
Page 39

Page 40

4
Argyll and Bute Council – Internal Audit Report– School Funds & Management of Funds August 2024
8. It was further agreed with Head of Education: Lifelong Learning and Support that the audit
would visit eleven schools, including a balance of primary and secondary schools, ensuring the
sample provided coverage across the Council’s four administrative areas. 
9. It was agreed that the purpose of the audit was to identify areas for process improvement to be
applied consistently across the Council’s school estate rather than it highlighting specific issues
at an individual school level. The drafting of this report, and the recommendations for
improvement contained within it, reflects this agreed focus on the process improvement.  The
schools visited during our review are set out in exhibit 1. Due to unforeseen issues we were
unable to visit Arrochar Primary before schools closed for the summer holidays so have carried
out limited testing of their processes. 
Exhibit 1 – Schools Visited 
Administrative Area Secondary School
Roll Primary School
Roll
Bute & Cowal Dunoon Grammar  745 Kirn Primary               298  
Rothesay Academy        277 North Bute Primary  27
Helensburgh &
Lomond                            
Arrochar Primary  39
Colgrain Primary 256
Mid Argyll, Kintyre
& Islay
Campbeltown Grammar  381 Clachan Primary  11  
Ardrishaig Primary  90
Oban, Lorn & The
Isles Tobermory High 151  Park Primary 216
Key Dates
10. The Terms of Reference provided provisional timescales for the review to take place, the actual
dates are noted below. 
Exhibit 2 – Key Dates
Stage Actual Date
Terms of Reference agreed 31 May 2024
Fieldwork Commencement 03 June 2024
Draft Report issued 08 August 2024
Management Comments received 09 August 2024
Final Report issued 19 August 2024
Audit and Scrutiny Committee 05 September 2024
Risks
11.  The risks considered throughout the audit were:
 Audit Risk 1: School Funds are not managed in accordance with Education Management
Circular 1.10
 Audit Risk 2: Reporting and monitoring of individual schools’ funds is not carried out in
accordance with Education Management Circular 1.10
 Audit Risk 3: Staff, and Committee members, involved in the management of school
funds have not received sufficient training.
Page 40

Page 41

5
Argyll and Bute Council – Internal Audit Report– School Funds & Management of Funds August 2024
Audit Opinion
12. We provide an overall audit opinion for all the audits we conduct. This is based on our
judgement on the level of assurance which we can take over the established internal controls,
governance and management of risk as evidenced by our audit work.  Full details of the five
possible categories of audit opinion is provided in Appendix 2 to this report.
13. Our overall audit opinion for this audit is that we can take a reasonable level of assurance. This
means that internal control, governance and the management of risk are broadly reliable.
However, whilst not displaying a general trend, there are areas of concern which have been
identified where elements of residual risk or weakness may put some of the system objectives at
risk.
Recommendations
14. We have highlighted two high priority and five medium priority recommendations where we
believe there is scope to strengthen the control and governance environment.  These are
summarised below:
 Education Management Circular 1.10, (the Circular), and its appendices, should be
reviewed, clarified and updated to contain a checklist section on key tasks which can be
used to document and confirm compliance; 
 Future updates and amendments to the Circular should be communicated to all relevant
staff in schools;
 The LEON module – School funds administration, should be updated to reflect any
changes to the Circular and should be considered as mandatory for new committee
members, new head teachers and new clerical staff in order to promote consistency and
compliance; 
 Practical training should be provided for head teachers, committee members and clerical
staff involved in the management and administration of school funds;
 The Circular should be updated to state that Admin and Finance Assistants (AFAs) must
be consulted prior to grant applications being submitted;
 A central school funds grant register should be created and maintained for grants over
£1,500; and
 A standard procedure note for the annual income and expenditure statement returns
should be created, this should include details of the checks/reviews and follow ups that
will be carried out. 
15. Full details of the audit findings, recommendations and management responses can be found in
Section 3 of this report and in the action plan at Appendix 1.
2. Objectives and Summary Assessment
16. Exhibit 3 sets out the control objectives identified during the planning phase of the audit and our
assessment against each objective.  
Exhibit 3 – Summary Assessment of Control Objectives 
Page 41

Page 42

6
Argyll and Bute Council – Internal Audit Report– School Funds & Management of Funds August 2024 
Control
Objective
Link to Risk Assessmen
t
Summary Conclusion
1 There is a
general fund
committee to
provide
governance of
the school
fund
Audit Risk 1 Reasonable  Seven of eleven schools visited had a
committee and a constitution which complied
with the requirements of the Circular but only
two were up to date.
 Four schools had no committee. 
 Only two of seven constitutions detail the
names and roles of the committee members.
 No schools are holding elections to appoint
committee members. 
 Only one school could provide a minute of
meetings, most meetings are not formal or
recorded.
 The Circular should be reviewed and updated
to reflect digital working practices and to
clarify roles and responsibilities. 
 There are a significant number of staff changes
within schools, the requirements within the
Circular should be reviewed to ensure that
they are flexible enough to be practically
deliverable, these should include instructions
for interim Head Teacher posts and cover for
clerical posts.
2 Training on
Education
Circular 1.10
has been
provided to all
relevant staff
and
Committee
members
Audit Risk 3 Limited  Feedback from schools found that some
clerical staff and committee members are
unaware of the Circular and therefore are
unaware of the standard processes and
templates to be applied and used. Future
updates and amendments should be
communicated to all staff in schools.
 There is a general lack of awareness of the
LEON module – School funds administration -
this should be considered as mandatory for
new committee members, new head teachers
and new clerical staff.
 Feedback from school is that practical training
should be provided for head teachers,
committee members and clerical staff involved
in the management and administration of
school funds.
 An Admin and Finance Assistant created a
practical “How to guide” and a streamlined
spreadsheet to support a member of clerical
staff new to the process. These should be
reviewed to see if they could be used to form
training materials.
3 Appropriate
record keeping
and banking
Audit Risk 1 Substantial  All eleven schools have appropriate banking
arrangements in place and maintain cashbook
spreadsheets although two primary schools
have paper versions. 
Page 42

Page 43

7
Argyll and Bute Council – Internal Audit Report– School Funds & Management of Funds August 2024
arrangements
are established
 Ten schools are performing monthly
reconciliations between the cashbook and
bank statements but seven are not subjecting
their reconciliations to independent checking.
 All schools have robust processes, however,
these do not fully follow the standard record
keeping and cashbook arrangements laid out in
the Circular. 
 Most of the schools now operate online
banking, the Circular and appendices should be
updated to reflect and record these
arrangements.
4 There are
appropriate
measures in
place to
manage
‘School Trip’
accounts.
Audit Risk 1 Reasonable  Two schools maintain separate trip accounts,
seven use the general purpose bank account
and in two small primary schools the parent
council manage school trips fund.
 While schools have clear and robust records
for trip accounts, it is not as per the
instructions in the Circular. 
 The Circular and templates should be updated
to provide clarity on roles and responsibilities
and to reflect current working practices.
5 All income and
expenditure is
adequately
recorded and
authorised and
cash handling
arrangements
are
appropriate
Audit Risk 1
Audit Risk 2
Reasonable  Only four schools have expenditure limits
stated in their constitution
 Schools have robust records and could provide
supporting documentation to evidence
expenditure and income but this was not in the
format detailed in the Circular. 
 Meetings are not recorded, meaning there are
instances where decisions to buy/purchase
have been verbal, however payment is always
authorised. 
 Some expenditure has not been authorised in
compliance with expenditure limits. 
 Supporting documentation for income was not
always retained in the school fund folder 
 In two schools, although the Head Teacher was
aware of the expenditure, they did not
physically sign any paperwork. 
 The Circular provides no instructions or
processes where there is an interim
appointment for the Head Teacher post. 
 There is no process for advising when schools
apply for grants and no school funds grants
register is maintained.
 Schools have appropriate arrangements in
place for securing cash and cheques.
6 School fund
accounts are
subject to
appropriate
Audit Risk 2 Limited  Only five schools had made arrangements for
school fund accounts to be independently
audited.  
Page 43

Page 44

8
Argyll and Bute Council – Internal Audit Report– School Funds & Management of Funds August 2024
audit and
record
retention
 In two schools the Parent Council Treasurer
independently audits the school fund accounts.
 Twenty six of the eighty schools asked, did not
submit an annual Income and Expenditure
Statement for 2022-23. 
 Limited checks are carried out on annual
returns received and there are no spot
checks/reviews of individual schools’
processes. 
 There is scope to set up a standard procedure
which should include details of the checks or
reviews and follow ups that will be carried out.   
17. Further details of our conclusions against each control objective can be found in Section 3 of this
report.  
3. Detailed Findings
There is a general fund committee to provide governance of the school fund 
18. The Circular requires that each school has a general fund committee which includes the Head
Teacher, depute plus elected representatives of the teaching staff and parents.  It also requires
the committees to have, as a minimum, a chairperson, secretary and administrator.  Of the
eleven schools visited and tested:
 seven have a committee with membership complying with the Circular; 
 none have parent representation;
 four are not aware of the Circular and have no committee at all.
Action Plan 1
19. The Circular requires schools to hold elections every two years to appoint committee members
however none of the schools have held elections in the past two years. Committee members
tend to have either volunteered or been asked to be involved.  Membership of committees only
tends to change if a member leaves with a replacement sought by asking for a volunteer at a
staff meeting.
Action Plan 1
20. The Circular requires each school fund committee to have a written constitution which defines
the committee’s role, membership and powers of co-option, and provides a template
constitution, in appendix 1, which schools can use but stresses that the template should be
regarded as illustrative and that a school may choose to add other details to their particular
constitution. Only two of the constitutions detailed the names or signatures of committee
members, both these schools also detail the authorised bank signatories. This is good practice
and the template constitution in appendix one should be updated to require the names and role
of committee members, their signatures and authorised bank account signatories.  
Action Plan 1
21. Seven of the eleven schools visited and tested had a written constitution with these
predominantly mirroring the template provided in the Circular, of these one detailed the same
expenditure limits suggested in the template and six had their own limits.  A review of the
Page 44

Page 45

9
Argyll and Bute Council – Internal Audit Report– School Funds & Management of Funds August 2024
Circular found that this contains different information regarding the authorisation of
expenditure than Appendix 1 constitution template. This should be reviewed and updated.
Action Plan 1
22. Secondary schools are required to have a payments sub-committee. Two of the secondary
schools constitutions state they have a sub-committee, in one it is the same members as the
actual committee and the other in practice doesn’t have one. When asked, schools questioned
the value of having a separate committee. During the review of the Circular, consideration
should be given to whether having a payments sub-committee is practical and still required for
secondary schools. 
Action Plan 1
23. The Circular requires schools to hold fund committee meetings ‘as often as necessary’, but at
least one per term for secondary schools and once a year for primary schools.  These meetings
are supposed to be minuted.  Only two of the schools visited holds fund meetings and one
schools minute them. The Circular should be update to clarify whether meetings are required to
support decisions to buy.
Action Plan 1
24. There are a significant number of staff changes within schools, the requirements within the
Circular should be reviewed to ensure that they are flexible enough to be practically deliverable,
in particular these should include instructions for interim Head Teacher posts and cover for
clerical posts. Discussions with staff and testing shows that often there is a reliance on one
member of clerical staff. This been highlighted in some schools where issues have arisen where
staff are either absent for a period of time or because the time taken to recruit for leavers has
resulted in a lack of handover.
Action Plan 1 and 4 
Training on Education Circular 1.10 has been provided to all relevant staff and Committee
members 
25. As a result of an Internal Audit of School Funds in 2018-19, significant work was undertaken to
review and have approved, Education Management Circular 1.10 (the Circular) and a supporting
School Funds LEON training module. The impact of lockdown and the subsequent remote
working arrangements caused a delay in the roll out of the updated Circular, until 2021-22. The
revised Circular was uploaded onto the Council’s internal website and circulated to Head
Teachers along with an announcement that the LEON training module was available and should
be completed. 
26. Feedback from schools found that some clerical staff and some committee members are
unaware of the Circular and therefore are unaware of the standard processes and templates.
Future updates and amendments should be communicated to all relevant staff in schools. 
Action Plan 2 
27. There is a general lack of awareness of the LEON module – School funds administration; this
should be mandatory for new committee members, new head teachers and new clerical staff.
The LEON module will require to be updated to reflect amendments to the Circular.
Action Plan 3
Page 45

Page 46

10
Argyll and Bute Council – Internal Audit Report– School Funds & Management of Funds August 2024
28. Discussions with school staff and AFAs, highlighted that the impact of lockdown and subsequent
restrictions led to schools having less expenditure via school funds as trips and events etc. were
cancelled/postponed and the focus was on implementing new ways of working. This is likely a
contributing factor to lack of impact of the roll out of the updated Circular and the launch of the
LEON module. 
29. The AFAs have no involvement in the school fund processes but do provide practical advice
when asked by clerical staff or Head Teachers, this tends to be in secondary schools where the
AFAs are the Line Managers of the office clerical staff. Some have provided training and others
point clericals towards the Circular and LEON module.  
30. With the exception of the LEON module, no formal training programme or support is in place for
those involved in the management and administration of school funds. The majority of staff
responsible for the administration of the school fund are clerical staff who have been trained by
previous staff members (handover training) or developed knowledge over time. This is in part
reflected in the inconsistent practices across schools visited. 
31. Feedback from school is that practical training should be provided for head teachers, committee
members and clerical staff involved in the management and administration of school funds. Staff
said that finding time for training has proved difficult while still completing their normal
work/tasks.   
32. An Admin and Finance Assistant created a practical “How to guide” and a streamlined
spreadsheet to support a member of the clerical staff new to the administration of the school
funds processes. These should be reviewed to see if they could be used to form part of new
training materials.
Action Plan 4
Appropriate record keeping and banking arrangements are established 
33. The Circular sets out a series of requirements in relation to how schools should maintain
financial records and manage bank accounts. Exhibit 4 sets out a summarised position of
compliance with these requirements for the twelve schools visited.
Exhibit 4 – Compliance with required Record Keeping and Banking Arrangements 
Requirement Compliant
Schools
School fund bank account in school name with no reference to the Council 11
Head teachers maintain list of school bank accounts detailing account name,
number, branch and account signatories
4
Three, or more, signatories for bank accounts with two required to operate  11
Cashbooks maintained within which all income and expenditure is recorded 10
Monthly reconciliations between cashbook and bank statements  10
Monthly reconciliations checked by second person 3
Income lodged intact (expenditure not taken out of income prior to banking) 11
Frequency of banking determined  by head teacher (no less than weekly) 11 
34. Local banking arrangements and a move away from cash have contributed to the use of online
banking. Six schools currently have online banking arrangements in place with another one in
the process of setting this up.  Some banks only require one person to make online payments,
Page 46

Page 47

11
Argyll and Bute Council – Internal Audit Report– School Funds & Management of Funds August 2024
this contradicts the two signatures required for a withdrawal. The process of making payments is
different from authorising expenditure and schools could provide evidence that expenditure was
authorised prior to the payment being made.  The Circular and appendix 1 template constitution
should be updated to include instructions/ guidance for the use and recording of on line banking
authorisations.  
Action Plan 1
35. All schools visited have mainly robust processes, however, these do not fully follow the standard
record keeping and cashbook arrangements laid out in the Circular. Eight were maintained in
Microsoft Excel, two were hand written in books and we were unable to test one.  Although the
information contained in the cashbooks bore similarities to the standard template provided in
Appendix 5 of the Circular, none were the same.  
Action Plan 1 & 3
36. Although all ten schools do perform monthly reconciliations between their cashbook and the
bank statement, only three have the reconciliation checked by a second person. Some of the
reconciliations were carried out on sticky notes on the bank statement, this is not sufficient in
terms of compliance. The Circular should contain a checklist section on key tasks which must be
adhered to. Consideration should be given to whether this checklist should be submitted as part
of the annual returns process in order to evidence compliance, these could then be subject to
spot checks.
Action Plan 1 and 5 
There are appropriate measures in place to manage ‘School Trip’ accounts.
37. The Circular acknowledges that schools may not have a separate ‘School Trip’ bank account but
rather will only operate one school funds bank account. Three schools maintain separate trip
accounts, six use the general purpose bank account and in two small primary schools the parent
council fund and manage school trips. 
38. The Circular provides instructions for school trips, requiring that a note of the amount held in
relation to each trip be maintained and that at the conclusion of each trip an income and
expenditure statement should be prepared and the balance, if not zero, should be transferred to
the main school fund account/balance. There is no description of roles and responsibilities, in
particular there is no mention that class teachers as trip leaders are usually responsible for
taking payments for these trips. Offering parents and carers the option to either make an online
payment to the school fund and the trial of the iPay system, has reduced the amount of cash
handled by teachers and clerical staff.  
39. Six schools maintain a separate cashbook for trips, two have separate lines on the general
purpose cashbook and two have no records as this is handled by the parent council. While
schools have clear and robust records for income and expenditure for individual trips, it is not as
per the instructions in the Circular. Only one school had balanced some trips back to zero, but
this was done just prior to our visit and although some trips are balanced out, no schools
prepare income and expenditure statements.  Some trips are re-occurring and schools have
ongoing fund raising for these. The Circular and templates should be updated to provide clarity
on roles and responsibilities and to provide guidance on standard working practices going
forward.
Action Plan 1
Page 47

Page 48

12
Argyll and Bute Council – Internal Audit Report– School Funds & Management of Funds August 2024
All income and expenditure is adequately recorded and authorised and cash handling
arrangements are appropriate
40. The Circular requires all income and expenditure to be recorded in a cashbook and be supported
by appropriate documentation which should be recorded as per instructions set out in appendix
5. As stated in para 37 above, cashbooks bore similarities to the standard template but none
were the same.  In addition, expenditure should be authorised in compliance with expenditure
limits established by the schools constitution.  One school couldn’t be tested fully, but for the
ten schools visited: 
 seven had constitutions, four of these had established limits but only two could evidence
that all expenditure had been authorised in compliance with these limits;
 all ten recorded expenditure in the cashbook which was supported by appropriate
documentation, although not always in the standard format detailed in the Circular; 
 some expenditure has not been authorised in compliance with stated expenditure limits. 
 there was no unauthorised expenditure; 
 all provide receipts for income, but four don’t record these in the cashbook
 all income is lodged intact; 
 supporting documentation for income was not always retained in the school fund folder; 
 all ten schools have appropriate arrangements in place for securing cash and cheques
and the frequency of banking; 
 we were provided assurances by all schools that cheques, where used, are fully
completed before they are signed
 meetings are not recorded, meaning there are instances where decisions to
buy/purchase have been verbal, however payment is always authorised;
 in two schools, although the Head Teacher was aware of the expenditure, they did not
physically sign any paperwork;
 as noted previously, there are no instructions for interim head teacher posts, with head
teachers not being added as a bank account signatory until they are permanent.   
41. Where schools use Council approved suppliers to purchase items, usually via PECOS and pay for
items through the Council purchase cards, the process followed by clerical staff to record this via
a google spreadsheet and arrange a payment to reimburse the Council. AFAs monitor and
reconcile these transactions as part of the budget monitoring process. 
42. The Circular states that schools must ensure that the Education Authority has knowledge of any
grant application for monies made to third parties that involve the school fund. There is no
established process for this, schools do not maintain a grants register and discussions with AFAs
found that they will only be advised in some cases and usually only after the application has
been submitted. 
43. Our review of income to school funds found that one school had a large donation for a specific
purpose but the email correspondence for this has not been saved in the shared school fund
folder on the server.  Another schools’ cashbook showed a large donation but we were unable to
test this before the school holidays. The concern is that some of these funds may be grants or
have been donated for a specific purpose, both are likely to have conditions attached and we
could not establish if these have been accurately recorded or whether there was appropriate
supporting evidence available. The Circular should be updated to state that AFAs must be
Page 48

Page 49

13
Argyll and Bute Council – Internal Audit Report– School Funds & Management of Funds August 2024
consulted prior to grant applications being submitted to ensure that the applicant is the correct
beneficiary and that income and expenditure is accurately recorded. Additionally, a central grant
register, covering all schools, should be created and maintained.
Action Plan 1 and 5 
School fund accounts are subject to appropriate audit and record retention 
44. The Circular requires schools to submit an annual income and expenditure statement be
prepared by the administrator and signed by all the bank account signatories. Testing of the year
ended 2022-23 established that: 
 there is no actual procedure note for the central education teams task, 
 the standard template, appendix 7, doesn’t state that all bank signatories should sign
this and it is not included with the email issued by the central education team; 
 only limited information is recorded when returns are received; 
 there is only one follow up email issued when returns are not received, usually
December; 
 twenty six of the eighty schools, (32.5%), failed to submit an annual Income and
Expenditure Statement;
 the format, style and quality of the annual statement varied considerably across the
schools visited, with only two schools statements signed by all bank signatories;
 no sample checks/reviews or audits are carried out;
 one of the schools tested, has not submitted a return since year ending 2018/19 and
there is no comment or explanation on the returns spreadsheet;
 the cumulative balance for the fifty four schools who submitted a return was £0.94m; 
 two of the larger secondary and one of the larger primary schools had significant
balances and there is no comment or explanation on the returns spreadsheet to say if
these have been queried.
There is scope to set up a standard procedure which should include details of the checks/reviews
and follow ups that will be carried out. 
Action Plan 6
45. The cumulative school fund balances noted above are circa £1m, this is mainly administered by
clerical staff with minimal financial training. AFAs should have sufficient oversight of all
secondary schools and primary schools with larger pupil role counts. Risks to the Council from
non-compliance or inaccurate recording of grants and donations would be mitigated by the
financially trained AFAs having an overview to ensure income, beneficiaries and expenditure is
recorded accurately and through the appropriate channel. This would also provide financial
support and reassurance to head teachers.
Action Plan 7
46. Schools are required to have their school fund audited on an annual basis by a person
unconnected to the administration of the fund. The auditor is required to sign the cashbook and
annual income and expenditure statement to evidence the performance of the audit. Our review
highlighted that:
 only five schools had made arrangements for their statements to be audited;
 no school gets the auditor to sign the cashbook;
Page 49

Page 50

14
Argyll and Bute Council – Internal Audit Report– School Funds & Management of Funds August 2024
 good practice was identified where two school fund accounts had been reviewed by the
Parent Council Treasurer. This is good as Parent Councils have knowledge of the school
and its activities which provides good scrutiny of the school fund. 
Schools should be reminded of their responsibility to have the school fund accounts
independently audited.  Consideration should be given to a task or calendar reminder for this
and other key tasks or events be set up, either as part of the Circular or the annual statement of
income and expenditure process. 
Action Plan 1 and 5
47. Discussions with staff confirm all schools retain records in accordance with the requirements.
Page 50

Page 51

Appendix 1 – Action Plan 
No Finding Risk Agreed Action Responsibility /
Due Date
High 1
Education Management Circular 1.10 and appendices 
As detailed in the report, there is a lack of adherence to the
standard practices contained in Education Management
Circular 1.10 and since the last update in 2020 there have
been changes to working practices. 
A summary of the points in the report will be provided in a
list for ease of reference. 
The Circular and its appendices needs reviewed, clarified and
updated and should contain a checklist section on key tasks
which can be used to document and confirm compliance. 
School Funds are not managed in
accordance with Education
Management Circular 1.10 
Working Group to be established
including HT, AFA, Clerical, Finance
Rep to review and update circular
School Services
Support Manager 
28 February 2025
Medium
2
Communicating amendments and updates 
Feedback from schools found that some clerical staff and
some committee members are unaware of EMC 1.10 and
therefore are unaware of the standard processes and
templates. 
Future updates and amendments to EMC 1.10 should be
communicated to all staff in schools. 
Staff involved in the management
of school funds are unaware of
the requirements within EMC
1.10 and standard procedures are
not followed.
Following update of Management
Circular information will be
cascaded to HTs and clericals.  Will
be put on HT agenda for discussion
School Services
Support Manager 
31 March 2025
Medium
3
LEON School Funds Training Module 
The LEON module should be updated to reflect the
amendments to EMC 1.10 and its appendices.
Additionally this module should be considered as mandatory
training for staff involved in the administration and
management of school funds including: all new committee
members, new/interim head teachers and new clerical staff. 
Staff, and Committee members,
involved in the management of
school funds have not received
sufficient training and standard
procedures are not followed.
LEON will be updated in line with
updated to circular and will be
made a mandatory training for
staff involved in the administration
and management of school fund.
School Services
Support Manager 
30 April 2025 
Page 51

Page 52

16
Argyll and Bute Council – Internal Audit Report– School Funds & Management of Funds August 2024 
No Finding Risk Agreed Action Responsibility /
Due Date
Medium
4
Practical Training 
With the exception of the LEON module, no formal training
programme or support is in place for those involved in the
management and administration of school funds. This is in
part reflected in the inconsistent practices across schools
visited. 
Practical training should be developed and provided for head
teachers, committee members and clerical staff involved in
the management and administration of school funds. 
Staff, and Committee members,
involved in the management of
school funds are unaware of the
requirements within EMC 1.10
and standard procedures are not
followed.
Training on school fund procedures
will be carried out.  Who will carry
out the training will be clarified as
part of the management circular
review
School Services
Support Manager 
30 June 2025 
HIGH 5
Grants 
The Circular states that schools must ensure that the
Education Authority has knowledge of any grant application
for monies made to third parties that involve the school fund.
There is no established process for this. 
 The Circular should be updated to state that AFAs must
be consulted prior to grant applications being submitted
to ensure that the applicant is the correct beneficiary and
that income and expenditure is accurately recorded. 
 A central grant register for grants over £1,500, covering
all schools, should be created and maintained. 
Grant income may not be
accurately accounted for and
evidence of compliance with
conditions may be readily
available. 
Circular will be updated to reflect
an instruction that AFAs must be
consulted prior to grant
applications being submitted. 
A central grant register for grants
over £1,500, covering all schools,
will be created and maintained.
Any grants over £1,500 will have to
be reported to Finance and this will
be reflected in the updated
circular.
School Services
Support Manager 
30 April 2025 
Medium
6
Annual income and expenditure statement returns 
There is no procedure note for this central education teams
task; no template is issued; only one follow up is issued; only
limited information is recorded when returns are received;
no sample checks/reviews or audits are carried out.  For the
year ended 2022-23, twenty six out of eighty schools (32.5%)
failed to submit a return. 
 A standard procedure note for the annual income and
expenditure statement returns should be created, this
Reporting and monitoring of
individual schools’ funds is not
carried out in accordance with
Education Management Circular
1.10. 
Returns will be submitted in line
with the timescale for CARP
documents.  There will be a
procedure note established for
this.  There will be 2 general
reminders issued and non-
returners will be referred to the
School Services Support Manager
for follow up
School Services
Support Manager 
31 October 2024
Page 52

Page 53

17
Argyll and Bute Council – Internal Audit Report– School Funds & Management of Funds August 2024 
No Finding Risk Agreed Action Responsibility /
Due Date
should include details of the checks/reviews and follow
ups that will be carried out.
 Consideration should be given to whether the checklist
for key tasks which must be adhered to, should be
submitted as part of the annual returns process to
evidence compliance, these could then be subject to spot
checks.
Medium
7
Financial oversight of school funds in secondary and larger
primary schools 
The cumulative school fund balances are circa £1m, this is
mainly administered by clerical staff with minimal financial
training. To ensure income and expenditure is accurately
recorded through the appropriate channels, Admin and
Finance Assistants, should have oversight of all secondary
schools and primary schools with larger pupil role counts. 
School funds may not be getting
managed appropriately
AFAs will be instructed to have
oversight of the school fund in all
secondary schools and primary
schools with rolls over 80
School Services
Support Manager 
30 April 2025 
Page 53

Page 54

18
Argyll and Bute Council – Internal Audit Report– School Funds & Management of Funds August 2024
In order to assist management in using our reports a system of grading audit findings has been adopted to allow the significance of findings to be ascertained.  The definitions
of each classification are as follows: 
Grading    Definition
High  A major observation on high level controls and other important internal controls or a significant matter relating to the critical success of the
objectives of the system.  The weakness may therefore give rise to loss or error. 
Medium 
Observations on less significant internal controls and/or improvements to the efficiency and effectiveness of controls which will assist in meeting
the objectives of the system.  The weakness is not necessarily substantial however the risk of error would be significantly reduced if corrective
action was taken.  
Low  Minor recommendations to improve the efficiency and effectiveness of controls or an isolated issue subsequently corrected.  The weakness does
not appear to significantly affect the ability of the system to meet its objectives. 
VFM  An observation which does not highlight an issue relating to internal controls but represents a possible opportunity for the council to achieve
better value for money (VFM). 
Page 54

Page 55

19
Argyll and Bute Council – Internal Audit Report– School Funds & Management of Funds August 2024
Appendix 2 – Audit Opinion 
Level of Assurance  Definition 
High 
Internal control, governance and the management of risk are at a high standard. Only marginal elements of residual risk have
been identified with these either being accepted or dealt with. A sound system of control designed to achieve the system
objectives is in place and being applied consistently. 
Substantial 
Internal control, governance and the management of risk is sound. However, there are minor areas of weakness which put some
system objectives at risk and specific elements of residual risk that are slightly above an acceptable level and need to be
addressed within a reasonable timescale. 
Reasonable 
Internal control, governance and the management of risk are broadly reliable. However, whilst not displaying a general trend,
there are areas of concern which have been identified where elements of residual risk or weakness may put some of the system
objectives at risk. 
Limited 
Internal control, governance and the management of risk are displaying a general trend of unacceptable residual risk above an
acceptable level and placing system objectives are at risk. Weakness must be addressed with a reasonable timescale with
management allocating appropriate resources to the issues raised. 
No Assurance 
Internal control, governance and the management of risk is poor. Significant residual risk and/or significant non-compliance with
basic controls exists leaving the system open to error, loss or abuse. Residual risk must be addressed immediately with
management allocating appropriate resources to the issues. 
Page 55

Page 56

This page is intentionally left blank

Page 57

Argyll and Bute Council
Internal Audit Report
June 2024
FINAL 
High Medium Low VFM
Number of
Findings
0 0 0 0 
Education Maintenance
Allowance-Verification Audit
Audit Opinion: High 
Page 57

Page 58

2 
Argyll and Bute Council – Internal Audit Report – EMA Verification audit, June 2024 
Contents 
1. Executive Summary ........................................................................................................................ 3
Introduction ............................................................................................................................................ 3
Background ............................................................................................................................................. 3
Scope ....................................................................................................................................................... 4
Risks ........................................................................................................................................................ 4
Audit Opinion ......................................................................................................................................... 4
2. Objectives and Summary Assessment ........................................................................................... 4
3. Detailed Findings ............................................................................................................................ 5
Appendix 1 – Audit Opinion ................................................................................................................... 7 
Contact Details 
Internal Auditor: Mhairi Weldon 
Telephone:  01546 604294 
e-mail:   Mhairi.weldon@argyll-bute.gov.uk 
www.argyll-bute.gov.uk
Page 58

Page 59

3 
Argyll and Bute Council – Internal Audit Report – EMA Verification audit, June 2024
1. Executive Summary
Introduction
1. As part of the 2024/25 internal audit plan, approved by the Audit & Scrutiny Committee in
March 2024, we have undertaken an audit of Argyll and Bute Council’s (the Council) system of
internal control and governance in relation to Education maintenance Allowance (EMA)
Verification.
2. The audit was conducted in accordance with the Public Sector Internal Audit Standards (PSIAS)
with our conclusions based on discussions with council officers and the information available at
the time the fieldwork was performed. The findings outlined in this report are only those which
have come to our attention during the course of our normal audit work and are not necessarily
all the issues which may exist.  It is the responsibility of management to determine the extent of
the internal control system appropriate to the Council.
3. The contents of this report have been agreed with the appropriate council officers to confirm
factual accuracy and appreciation is due for the cooperation and assistance received from all
officers over the course of the audit.
Background
4. Regulation 3 of the Education Maintenance Allowances (Scotland) Regulations 2007 (“the 2007
Regulations”) allows the Scottish Ministers to pay an education maintenance allowance (EMA) to
provide support for eligible 16 to 19 year olds who are engaged in full-time education in school;
undertaking a course of non-advanced education at home which has been approved by the
education authority; or undertaking a course of non-advanced education elsewhere under the
supervision of the education authority (including Learning Agreements/Action Plans). The 2007
Regulations form the basis of the EMA programme which aims to increase participation and
retention in post-compulsory education, thus increasing skills and life chances for this group.
EMA payments are made by the Council to eligible young people in school and other types of
learning within the local authority area in accordance with the 2007 Regulations, and the EMA
(Scotland) Guidance and Processes, provided that a young person is eligible for EMA, that a
young person qualifies based on the EMA eligibility criteria and a signed learning agreement is in
place.
5. The EMA programme offers means-tested financial support of £30 per week in arrears during
term-time to eligible young people from low income households who are planning to continue in
post-compulsory education.  Eligibility for EMA payments depends on the young person's age,
household income, residency, course validity and completion of a learning agreement detailing
targets and attendance requirements.  
6. The Scottish Government (SG) reimburses the Council for payments made to young people
following submission of monthly grant claims and a year-end statement confirming the total of
the monthly claims.  A standard allowance for the costs of administering the programme as well
as an additional £15 for each new application processed is also paid by the SG.
7. Audit Scotland published technical guidelines, TGN/EMA/21 in March 2021 and this was used to
support auditors in the verification of EMA claims.
Page 59

Page 60

4 
Argyll and Bute Council – Internal Audit Report – EMA Verification audit, June 2024
Scope 
8. The scope of the audit was to assess that the Council is fully compliant with requirements as set
out in the Offer of Grant for EMA 2023/24.
Risks
9.  The risks considered throughout the audit were:
• Audit Risk 1 – The Council fails to comply with the provisions set out in the Offer of grant
for EMA 2023-24
Audit Opinion
10. We provide an overall audit opinion for all the audits we conduct. This is based on our
judgement on the level of assurance which we can take over the established internal controls,
governance and management of risk as evidenced by our audit work.  Full details of the five
possible categories of audit opinion is provided in Appendix 1 to this report.
11. Our overall audit opinion for this audit is that we can take a high level of assurance.  This means
that, internal control, governance and the management of risk are at a high standard. Only
marginal elements of residual risk have been identified with these either being accepted or dealt
with. A sound system of control designed to achieve the system objectives is in place and being
applied consistently.
2. Objectives and Summary Assessment
12. Exhibit 1 sets out the control objectives identified during the planning phase of the audit and our
assessment against each objective.   
Control Objective Link to Risk Assessment Summary Conclusion
1 The year-end
statement has been
completed in
accordance with
guidance.
Audit Risk 1 High Appropriate arrangements are in place
to process applications and payments
and prepare and submit accurate
monthly claims and year-end
schedules.  All payments and costs
were confirmed on the Council’s
general ledger and verified on the
claims submitted.
2 Young people have
been correctly
assessed for
eligibility.
Audit Risk 1 High A detailed review of a sample of 10
young people confirmed that EMA was
appropriately awarded following
submission of the required evidence in
support of their applications.
3 Administration costs
have been
appropriately
applied.
Audit Risk 1 High The additional top-up administration
cost has been applied to the monthly
claims and correctly reflected in the
year-end claim.
4 Completion
procedures have
been appropriately
followed.
Audit Risk 1 High The claim forms submitted accurately
reflected payments made and costs
incurred in accordance with the terms
and conditions of the Offer of Grant. 
Page 60

Page 61

5 
Argyll and Bute Council – Internal Audit Report – EMA Verification audit, June 2024
Claims and supporting evidence were
reviewed, certified and confirmed to
Scottish Government. 
13. Further details of our conclusions against each control objective can be found in Section 3 of this
report.  
3. Detailed Findings
The year-end statement has been completed in accordance with guidance.
14. The Councils arrangements for the completion of the year end statement are adequate. All
relevant parts of the year end statement have been completed and signed by the Council’s
Executive Director/Section 95 Officer including schedules 4 to 6 as required in the Offer of Grant
for EMA 2023-24 letter.  
15. The entries on the year-end statement were reviewed and found to be consistent with the total
of the monthly claims submitted and also with entries lodged on the Council’s general ledger.
Young people have been correctly assessed for eligibility
16. A total of 189 young people were awarded EMA payments in 2023-24, from these, a random
sample of 10 was chosen for detailed review of supporting documentation to confirm they met
the eligibility criteria as set out below: 
• Proof of age to confirm young person is between 16 and 19 years of age
• Household income below £24,421 (one child) or £26,884 (more than one child)
• UK citizen or qualifying non-national who are resident in Argyll and Bute area
• Course(s) being undertaken is/are valid and require attendance of at least 21 hours per week
• An agreement has been completed detailing learning goals and level of attendance required 
• Attendance records confirming eligibility for each weekly payment made
• Back-payments were made in accordance with grant requirements 
17. Documentation provided confirmed that all young people within the sample selected for review
were appropriately awarded EMA following submission of the required evidence. 
Administration costs have been appropriately applied
18. The Council is in receipt of a flat rate of £25k for administering the EMA programme, in addition
to this, an administration cost of £15 per new applicant in receipt of at least one payment of
EMA is available to claim.  The administration cost was correctly applied to monthly claims, a
total of £3,045 was recovered from the SG in respect of this element and was found to be
consistent with the documented requirements.
Completion procedures have been appropriately followed
19.  Testing carried out confirmed that payments were made in accordance with the grant terms
and conditions and no adjustments required to be made.
Page 61

Page 62

In order to assist management in using our reports a system of grading audit findings has been adopted to allow the significance of findings to be ascertained. 
The definitions of each classification are as follows: 
Grading    Definition
High  A major observation on high level controls and other important internal controls or a significant matter relating to the critical success of the
objectives of the system.  The weakness may therefore give rise to loss or error. 
Medium 
Observations on less significant internal controls and/or improvements to the efficiency and effectiveness of controls which will assist in meeting
the objectives of the system.  The weakness is not necessarily substantial however the risk of error would be significantly reduced if corrective
action was taken.  
Low  Minor recommendations to improve the efficiency and effectiveness of controls or an isolated issue subsequently corrected.  The weakness does
not appear to significantly affect the ability of the system to meet its objectives. 
VFM  An observation which does not highlight an issue relating to internal controls but represents a possible opportunity for the council to achieve
better value for money (VFM). 
Page 62

Page 63

7 
Argyll and Bute Council – Internal Audit Report – EMA Verification audit, June 2024
Appendix 1 – Audit Opinion 
Level of Assurance  Definition 
High  Internal control, governance and the management of risk are at a high standard. Only marginal elements of residual risk have
been identified with these either being accepted or dealt with. A sound system of control designed to achieve the system
objectives is in place and being applied consistently. 
Substantial  Internal control, governance and the management of risk is sound. However, there are minor areas of weakness which put some
system objectives at risk and specific elements of residual risk that are slightly above an acceptable level and need to be
addressed within a reasonable timescale. 
Reasonable 
Internal control, governance and the management of risk are broadly reliable. However, whilst not displaying a general trend,
there are areas of concern which have been identified where elements of residual risk or weakness may put some of the system
objectives at risk. 
Limited  Internal control, governance and the management of risk are displaying a general trend of unacceptable residual risk above an
acceptable level and placing system objectives are at risk. Weakness must be addressed with a reasonable timescale with
management allocating appropriate resources to the issues raised. 
No Assurance  Internal control, governance and the management of risk is poor. Significant residual risk and/or significant non-compliance with
basic controls exists leaving the system open to error, loss or abuse. Residual risk must be addressed immediately with
management allocating appropriate resources to the issues. 
Page 63

Page 64

This page is intentionally left blank

Page 65

Argyll & Bute Health & Social Care Partnership
Internal Audit Report
March 2024
FINAL 
High Medium Low VFM
Number of Findings 0 0 1 0 
Adult Services-Adult Support
and Protection 
Audit Opinion: Substantial 
Page 65

Page 66

2 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Adult Services-Adult Support
and Protection, March 2024 
Contents 
1. Executive Summary ........................................................................................................................ 3
Introduction ............................................................................................................................................ 3
Background ............................................................................................................................................. 3
Scope ....................................................................................................................................................... 5
Risks ........................................................................................................................................................ 5
Audit Opinion ......................................................................................................................................... 5
Recommendations ................................................................................................................................. 5
2. Objectives and Summary Assessment ........................................................................................... 6
3. Detailed Findings ............................................................................................................................ 7
Appendix 1 – Action Plan ..................................................................................................................... 10
Appendix 2 – Audit Opinion ................................................................................................................. 12 
Contact Details 
Internal Auditor: Moira Weatherstone 
Telephone:   01546 604146
e-mail:   moira.weatherstone@argyll-bute.gov.uk 
www.argyll-bute.gov.uk
Page 66

Page 67

3 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Adult Services-Adult Support
and Protection, March 2024
1. Executive Summary
Introduction
1. As part of the 2023/24 internal audit plan, approved by the Audit & Risk Committee in February
2023, we have undertaken an audit of Argyll & Bute Health & Social Care Partnership (HSCP)
system of internal control and governance in relation to Adult Services-Adult Support and
Protection. 
2. The audit was conducted in accordance with the Public Sector Internal Audit Standards (PSIAS)
with our conclusions based on discussions with Health & Social Care Partnership officers and the
information available at the time the fieldwork was performed. The findings outlined in this
report are only those which have come to our attention during the course of our normal audit
work and are not necessarily all the issues which may exist. Appendix 1 to this report includes
agreed actions to strengthen internal control however it is the responsibility of management to
determine the extent of the internal control system appropriate to the HSCP. 
3. The contents of this report have been agreed with the appropriate Health & Social Care
Partnership officers to confirm factual accuracy and appreciation is due for the cooperation and
assistance received from all officers over the course of the audit. 
Background 
4. Scottish Ministers requested that the Care Inspectorate lead joint inspections of adult support
and protection in collaboration with Healthcare Improvement Scotland and Her Majesty’s
Inspectorate of Constabulary in Scotland. The joint inspection of the Argyll and Bute partnership
took place between June 2021 and September 2021, with the report being issued in September
2021. 
5. To provide Scottish Ministers with timely high-level information, the joint inspection report
included a statement about the Council’s progress in relation to our two key questions: 
• How good were the partnership’s key processes for adult support and protection?
• How good was the partnership’s strategic leadership for adult support and protection? 
6. The report concluded that the partnership’s key processes for adult support and protection were
effective with areas for improvement. There were clear strengths supporting positive
experiences and outcomes for adults at risk of harm, which collectively outweighed the areas for
improvement. 
7. The summary concluded:   
• “The Argyll and Bute partnership had an established and clear vision, supported by an
effective multi-agency adult protection committee. The strategic response to the Covid-
19 pandemic was effective with strong community engagement. The partnership was
particularly proactive in raising awareness of adult support and protection within the
community and with the people responsible for planning, delivering and evaluating care
and support;
Page 67

Page 68

4 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Adult Services-Adult Support
and Protection, March 2024 
• Partner agencies worked collaboratively to improve outcomes for adults at risk of harm.
The partnership should involve health and police staff more in key stages of the adult
support and protection process. Senior leaders effectively managed significant
challenges in maintaining adequate staffing levels during the Covid-19 pandemic. A
combined approach from partner agencies and volunteers helped to keep people safe
and protected; 
• The systems and processes for carrying out initial inquiries into adult support and
protection concerns were effective which helped to ensure concerns raised by people
were progressed timeously by appropriate staff. Investigations were carried out by the
partnership effectively, which helped to keep adults at risk of harm safe and protected.
However, the governance of risk assessments and chronologies needed to be
significantly improved to minimise risks for adults at risk of harm. This had been
identified by previous audits carried out by the partnership; however, the lack of
improvement suggests leadership’s ability to affect change has been limited”. 
8. The key strengths highlighted in the report were: 
• “Adults at risk of harm were safer due to effective multi-agency working;
• The partnership conducted a comprehensive audit of adult support and protection
practice to determine how effective systems were at protecting adults at risk of harm; 
• A range of adult support and protection learning and development sessions and online
training were made available to all staff. Staff knew where to get advice if they had
concerns about an adult at risk of harm. Staff raised concerns regarding adult support
and protection timeously and most staff said referral processes were clear and well
understood;
• Adults at risk of harm benefitted from social contact, support and advice from staff and
volunteers. This was particularly helpful during the periods of restriction due to Covid-19
when risks associated with isolation increased; 
• Investigations were collaborative, well documented and effective;
• Strategic leadership recognised the impact of financial harm and implemented effective
governance to minimise risks”. 
9. There were 4 priority areas identified for improvement: 
• “All relevant partners should be invited to participate in case conferences and review
case conferences;
• The ‘three-point test’ is an essential factor in determining if the adult is at risk of harm.
The application of the test should be clearly documented during initial inquiry to show
decision making rationale;
• All adults at risk of harm should have a risk assessment, which is comprehensive;
• There should be a consistent approach to preparing and recording chronologies for all
adults at risk of harm who require one”. 
10. The report required that the Argyll and Bute partnership prepare an improvement plan to
address the priority areas for improvement with the Care Inspectorate, through its link
Page 68

Page 69

5 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Adult Services-Adult Support
and Protection, March 2024
inspector, Healthcare Improvement Scotland and Her Majesty’s Inspectorate of Constabulary in
Scotland will monitor progress implementing this plan.   
Scope 
11. The scope of the audit was to assess response to 2021 Review of Adult Services to provide
assurance that strategic decisions have been taken to deliver on outcomes as outlined in the
Terms of Reference agreed with the Head of Adult Services (Mental Health, Acute and Complex
Care) on 23 February 2024. 
Risks 
12.  The risks considered throughout the audit were:
• SRR13 – Service Delivery
• Audit Risk 1: Failure to prepare an improvement plan
• Audit Risk 2: Failure to implement improvement plan
• Audit Risk 3: Failure to monitor progress of plan 
Audit Opinion 
13. We provide an overall audit opinion for all the audits we conduct. This is based on our
judgement on the level of assurance which we can take over the established internal controls,
governance and management of risk as evidenced by our audit work.  Full details of the five
possible categories of audit opinion is provided in Appendix 2 to this report. 
14. Our overall audit opinion for this audit is that we can take a substantial level of assurance.  This
means that internal control, governance and the management of risk is sound. However, there
are minor areas of weakness which put some system objectives at risk and specific elements of
residual risk that are slightly above an acceptable level and need to be addressed within a
reasonable timescale. 
Recommendations 
15. We have highlighted one low priority recommendations where we believe there is scope to
strengthen the control and governance environment. These are summarised below: 
• Work should continue to ensure that all the improvement plan action points are
completed ahead of any follow up audit by the Care Inspectorate and that all partners
engage with the processes and procedures put in place 
16. Full details of the audit findings, recommendations and management responses can be found in
Section 3 of this report and in the action plan at Appendix 1. 
Page 69

Page 70

6 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Adult Services-Adult Support
and Protection, March 2024
2. Objectives and Summary Assessment
17. Exhibit 1 sets out the control objectives identified during the planning phase of the audit and our
assessment against each objective.   
Exhibit 1 – Summary Assessment of Control Objectives 
Control Objective Link to Risk Assessment Summary Conclusion
1 An improvement
plan has been put in
place
SRR13
Audit Risk 1
High A comprehensive improvement plan
was developed in 2021 with the aim of
improving activity in health and social
care to make services better for the
people who use them.  Argyll and Bute
Adult Support and Protection
Partnership (the Partnership) were
required to submit the Improvement
Plan by November 2021, to the Link
Inspector, demonstrating that it
addresses the priority areas for
improvement identified within the
report.  In addition, the Partnership
were required to respond to a post
inspection questionnaire which was
also required to be submitted in
November 2021. Both were submitted
within the deadline.
2 Recording and
monitoring
processes have been
put in place to
monitor progress
against plan
SRR13
Audit Risk 3
Substantial Recording and monitoring processes
have been put in place to track
progress against the Improvement
Plan. The ASP Improvement Plan –
Action Plan is populated to identify the
action required, the Current
Position/Update, the identified
responsible officer, the timescales
identifying when the action was last
revised and the current status.  A
reflective retrospective Adult Support
and Protection (ASP) audit was
completed across the four Localities of
Argyll. The purpose of the audit was to
identify the quality of practice and
recording in Adult Support and
Protection cases after the Joint
Inspection of Adult Support and
Protection.  The audit highlighted that
there was room for improvement in a
number of key areas, including greater
participation of key partners in case
conferences. In addition, chronologies,
risk assessments and the ‘three point
test’ must be completed.
Page 70

Page 71

7 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Adult Services-Adult Support
and Protection, March 2024
3 Progress against
improvement plan
has been reported
to relevant officer
and/or Committees
Audit Risk 2 Substantial Progress against the Improvement Plan
is published and reported.  The
Improvement Plan is a standing agenda
item at the Argyll and Bute Adult
Protection Committee (APC) where
progress and updates are provided.
The APC is a multi-agency committee.
In addition, the Council Officer Forum
discuss the improvement areas
outlined in the report.  This forum is
attended by various Council Officers.   
18. Further details of our conclusions against each control objective can be found in Section 3 of this
report.  
3. Detailed Findings
An improvement plan has been put in place 
19.  A joint inspection of the Argyll and Bute partnership took place between June 2021 and
September 2021, with a report being issued in September 2021. The report required that the
Argyll and Bute Partnership prepare an improvement plan to address the priority areas for
improvement.  A comprehensive improvement plan was developed in 2021 with the aim of
improving activity in health and social care to make services better for the people who use them,
including considering making services safer, more effective, more person-centred, more
equitable and timelier. 
20. The improvement plan identifies the key areas for improvement within the report, identifies
barriers to improvement, outlines an action plan for improvement and details the monitoring
process including how success will be measured.  In addition, it identifies target dates for
completion. 
21. Argyll and Bute Adult Support and Protection Partnership (the Partnership) were required to
submit to the Link Inspector, the Improvement Plan by November 2021 demonstrating that it
addresses the priority areas for improvement identified within the report.  In addition the
Partnership were required to respond to a post inspection questionnaire which was also
required to be submitted in November 2021. Both were submitted within the deadline. 
Recording and monitoring processes have been put in place to monitor progress against plan 
22. Recording and monitoring processes have been put in place to track progress against the
Improvement Plan. The Adult Support and Protection (ASP) Improvement Plan – Action Plan is
populated to identify the action required, the Current Position/Update, the identified
responsible officer, the timescales identifying when the action was last revised and the current
status.  The current status is recorded as a traffic light system - red, amber and green. 
Page 71

Page 72

8 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Adult Services-Adult Support
and Protection, March 2024
23. A reflective retrospective ASP audit was completed across the four Localities of Argyll and Bute.
The purpose of the audit was to identify the quality of practice and recording in ASP cases after
the Joint Inspection of Adult Support and Protection.  A sample of 40 case files which had ASP
activity between March 2022 and April 2023 were randomly selected for audit review. 
24. Significant progress has been made to address the key areas of improvement highlighted within
the report specifically: 
• In terms of improvement, as per the requirements of the report, all relevant partners
were invited to participate in case conferences and review case conferences. However,
the final ASP Case File Audit 2023/24, dated 4 March 2023, noted that 100% of relevant
parties were invited to attend the case conference, however, only 11% of files read
considered that all relevant parties attended the case conference. The relevant parties
invited but who did not attend include GP; Parkinson’s Nurse; Advocacy; Consultant
Psychiatrist; Police; and Scottish Fire and Rescue.  With more case conferences taking
place online, this is considered to be the preferred option.  It is now considered that
increased ability for professionals to attend an online meeting might improve overall
multi-agency attendance. 
• The report highlighted that the application of the ‘three-point test’ should be clearly
documented during initial inquiry to show decision making rationale. Training courses,
training materials and updated procedures which include information on the three point
test have been made available. In addition, on Eclipse (the client record management
database) there are three questions about each of the points of the three point test,
these are all mandatory fields.  There is also a supplementary text box for each to give
details of the rationale for the answer to each of the three questions, these too are
mandatory.  Mandatory questions, if not answered, allow the user to fill in the form,
however, the form cannot be submitted until all mandatory questions have been
answered. From the 1st of April as a result of work currently being undertaken to update
the forms and worklists on Eclipse, there will be a further mandatory question
introduced “Does the person meet the criteria of the three point test”. The final ASP
Case File Audit 2023/24, highlighted of 40 client records tested, the three-point test had
been applied correctly in 87% cases.   
• In order to address the requirement that all adults at risk of harm should have a risk
assessment, a newly devised comprehensive Risk Assessment (RA) document has been
developed with the expectation that it is completed alongside the Eclipse IT
documentation for all cases investigated.  There is a requirement that the risk
assessments must be completed for all ASP cases and submitted to a case conference 24
hours in advance. The final ASP Case File Audit 2023/24, noted that of the 40 client
records tested, 57% of files had a risk assessment and of those,  96% of files were noted
as having multi-agency involvement in the risk assessment, 9% of risk assessments were
deemed to be weak, 31% were rated good and 30% very good. 
• Significant progress has been made to adopt a consistent approach to preparing and
recording chronologies for all adults at risk of harm who require one, however it is noted
that the implementation of a schedule of monthly peer review/ case file audit has been
delayed due to workforce challenges.  Quarterly scrutiny of inquiry and investigation
Page 72

Page 73

9 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Adult Services-Adult Support
and Protection, March 2024
documentation demonstrates that some workers continue to overlook this. The final
ASP Case File Audit 2023/24 identified that of the 40 client records tested, there has
been little improvement in chronologies within ASP recording with 53% of the audited
cases not having a chronology when it was considered that there should have been one
and of those with a chronology, 74% were to an acceptable standard.  Training and
guidance is in place and in addition all staff undertaking adult support and protection
activity are aware that they are required to complete the Eclipse Chronology. ASP
training has been further developed to ensure understanding and analysis of the 3 point
test.  A new second worker course aimed at Health workers as second workers has been
created and trialled.   The completion of useful Chronologies is a national issue, hence
the creation of the National Implementation Group Chronologies of which the Lead
Officer is a member.  New learning and development materials are currently being
identified nationally and training for all Argyll and Bute staff, involved in ASP recording,
is currently being developed for use in 2024.   
• Scottish Fire and Rescue service and all other partners with a duty to cooperate are
included in key stages of the adult protection processes when this is appropriate. The
Multi-Agency Forum/Discussion  (MAF/D) was established as part of Argyll and Bute
Health and Social Care Partnership’s Adult Support and Protection Strategy. The overall
aim of this group meeting is to have first line sight of individuals who come to the
attention of services, including the police, ambulance, fire services, health or social care
and housing and to provide a platform for multi-agency discussion to decide on the most
appropriate response.              
Action Plan 1 
Progress against improvement plan has been reported to relevant officer and/or Committees   
25. Progress against the Improvement Plan is published and reported.  The Improvement Plan is a
standing agenda item at the Argyll and Bute Adult Protection Committee (APC) where progress
and updates are provided. The APC is a multi-agency committee. We are advised that this is
augmented by regular meetings with the link Inspector. 
26. The Council Officer Forum discuss the improvement areas outlined in the report.  This forum is
attended by various Council Officers.   
Page 73

Page 74

Appendix 1 – Action Plan 
No Finding Risk Agreed Action Responsibility / Due Date
Low
4 Progress 
Whilst significant progress has been made to address the
key areas identified within the report there remains
challenges in terms of ensuring attendance by all relevant
partners at case conferences, ensuring that chronologies
and risk assessments are completed and ensuring that the
‘three point test’ is undertaken.
Adverse feedback from
the follow up audit
undertaken by the Care
Inspectorate
Adult services will
facilitate an ASP audit
on a six monthly basis
to determine practice
and compliance with
ASP legislation and KPIs
Head of Adult Services
(Mental Health, Acute and
Complex Care) 
30 September 2024 
Page 74

Page 75

11 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Adult Services-Adult Support and Protection, March 2024
In order to assist management in using our reports a system of grading audit findings has been adopted to allow the significance of findings to be ascertained. 
The definitions of each classification are as follows: 
Grading    Definition
High  A major observation on high level controls and other important internal controls or a significant matter relating to the critical success of the
objectives of the system.  The weakness may therefore give rise to loss or error. 
Medium 
Observations on less significant internal controls and/or improvements to the efficiency and effectiveness of controls which will assist in meeting
the objectives of the system.  The weakness is not necessarily substantial however the risk of error would be significantly reduced if corrective
action was taken.  
Low  Minor recommendations to improve the efficiency and effectiveness of controls or an isolated issue subsequently corrected.  The weakness does
not appear to significantly affect the ability of the system to meet its objectives. 
VFM  An observation which does not highlight an issue relating to internal controls but represents a possible opportunity for the HSCP to achieve better
value for money (VFM). 
Page 75

Page 76

12 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Adult Services-Adult Support and Protection, March 2024
Appendix 2 – Audit Opinion 
Level of Assurance  Definition 
High  Internal control, governance and the management of risk are at a high standard. Only marginal elements of residual risk have
been identified with these either being accepted or dealt with. A sound system of control designed to achieve the system
objectives is in place and being applied consistently. 
Substantial  Internal control, governance and the management of risk is sound. However, there are minor areas of weakness which put some
system objectives at risk and specific elements of residual risk that are slightly above an acceptable level and need to be
addressed within a reasonable timescale. 
Reasonable 
Internal control, governance and the management of risk are broadly reliable. However, whilst not displaying a general trend,
there are areas of concern which have been identified where elements of residual risk or weakness may put some of the system
objectives at risk. 
Limited  Internal control, governance and the management of risk are displaying a general trend of unacceptable residual risk above an
acceptable level and placing system objectives are at risk. Weakness must be addressed with a reasonable timescale with
management allocating appropriate resources to the issues raised. 
No Assurance  Internal control, governance and the management of risk is poor. Significant residual risk and/or significant non-compliance with
basic controls exists leaving the system open to error, loss or abuse. Residual risk must be addressed immediately with
management allocating appropriate resources to the issues. 
Page 76

Page 77

ARGYLL AND BUTE COUNCIL  AUDIT AND SCRUTINY COMMITTEE 
FINANCIAL SERVICES 5 SEPTEMBER 2024 
INTERNAL AUDIT - ANNUAL SELF-ASSESSMENT 
1. EXECUTIVE SUMMARY 
1.1 This paper informs the Audit and Scrutiny Committee (the Committee) of the
findings from the recent internal self-assessment of the Council’s Internal Audit
service performed by a member of the Internal Audit team. 
2. RECOMMENDATIONS 
2.1 Members are requested to review and endorse the findings of the assessment
including the identified areas for improvement, where applicable. 
3. DETAIL 
3.1 The Public Sector Internal Audit Standards (PSIAS) require the Council’s Chief
Internal Auditor (CIA) to develop a Quality Assurance and Improvement
Programme (QAIP). The purpose of the QAIP is to enable the evaluation of
internal audit’s conformance to the PSIAS. The QAIP must include annual
internal self-assessments with a five yearly external assessment, carried out by
an independent assessor. 
3.2 The Council’s last external independent assessment was reported to the
Committee in March 2023 and concluded that internal audit demonstrated full
compliance with PSIAS in all 14 areas of criteria, along with identified good
practice. It also highlighted two minor areas for potential improvement which
now have been fully implemented. A further internal self-assessment has been
undertaken and again confirms compliance with all criteria. 
3.3 The 2024 self-assessment exercise has been completed and the table below
summarises the assessment of the service against each of the fourteen PSIAS
assessment areas. 
PSIAS Assessment Area Assessment
1 Mission of internal audit Fully Conforms
2 Definition of internal auditing Fully Conforms
3 Code of ethics Fully Conforms
4 Purpose, authority and responsibility Fully Conforms
5 Independence and objectivity Fully Conforms
6 Proficiency and due professional care Fully Conforms
7 Quality assurance and improvement programme Fully Conforms
8 Managing the internal audit activity Fully Conforms
9 Nature of work Fully Conforms
10 Engagement planning Fully Conforms
11 Performing the engagement Fully Conforms
12 Communicating results Fully Conforms
13 Monitoring progress Fully Conforms
14 Communicating the acceptance of risks Fully Conforms
Page 77 Agenda Item 7

Page 78

3.4 The self-assessment identified a number of areas of good practice and no further
areas for improvement – these are summarised in the table below. 
Good Practice
Comprehensive Internal Audit Charter which is subject to annual review
and approval
Robust procedures for ensuring independence and objectivity
CIA has regular engagement with senior management
Experienced and qualified team focused on continuous improvement
Robust and structured audit planning
Clear link between identified risks and audit work
Strong audit engagement review and supervision
Full and transparent audit reporting to Senior Management and
Committee 
Comprehensive follow up process
Regular progress reporting to Committee
Annual assurance mapping 
Very positive feedback from services on audit approach and outputs
Area for Improvement
No actions outstanding.     
4. CONCLUSION 
4.1 The Internal Audit service has been self-assessed as fully conforming with
PSIAS in all of the 14 assessment areas. This assessment is consistent with
the opinions raised in the independent External Quality Assurance Assessment
(EQA) reported to the Audit and Scrutiny committee in March 2023.
4.2 Overall, the CIA is of the view that this is a positive self-assessment which
reflects well on the team and their ongoing commitment to improvement. This
process is one element of assessing and determining compliance with best
practice and mandatory requirements outlined by the relevant regulatory
bodies. There will always be opportunity for improvement and development
within the service and this will be reflected upon on a regular basis to improve
the service we provide to the Council.
4.3 The Internal Audit service will continue to monitor compliance on an annual
basis and also as part of the five yearly external quality assessment
programme and will be subject to a comprehensive review undertaken by
another local authority Chief Internal Auditor which is next scheduled for
2027/28.
5. IMPLICATIONS 
5.1 Policy – Internal Audit continues to adopt a risk-based approach to activity
5.2 Financial –None
5.3 Legal –None
5.4 HR – None
5.5 Fairer Scotland Duty – None
5.5.1 Equalities – protected characteristics – None
5.5.2 Socio-Economic Duty – None
5.5.3 Islands – None
Page 78

Page 79

5.6 Climate Change – None 
5.7 Risk – None
5.8 Customer Service – None
5.9 The Rights of the Child (UNCRC) – None 
Paul Macaskill, 
Chief Internal Auditor
5 September 2024                                                  
For further information contact: 
Paul Macaskill, Chief Internal Auditor (01546 604108) 
Page 79

Page 80

This page is intentionally left blank

Page 81

ARGYLL AND BUTE COUNCIL  Audit and Scrutiny Committee
Legal and Regulatory Support  5 September 2024 
Corporate Complaints – Annual Report 2023-24 
1.0 INTRODUCTION 
1.1 The report provides information on how the Council has dealt with
complaints during the period between 1 April 2023 and 31 March 2024,
and performed against the statutory indicators which have been agreed
between the Scottish Public Services Ombudsman (SPSO) and the Local
Authorities Complaint Handlers Network. 
2.0 RECOMMENDATIONS 
2.1 It is recommended that the Committee consider and note the content of
this report. 
3.0 DETAIL 
3.1 All Council services follow the SPSO’s model complaint handling
procedure (CHP). A requirement of this model procedure is that the
Council report to the SPSO on a standard set of statutory performance
indicators, and prepare an annual report for consideration by Members. 
The report attached at appendix 1 has been prepared in order to satisfy
this requirement.   
3.2 The scope of this report includes complaints received in relation to Live
Argyll, and also includes complaints which relate to the Social Work
service within Argyll and Bute HSCP.   
3.3 The SPSO introduced a new model complaints handling procedure from
01 April 2021, which all local authorities were required to adopt. This
updated procedure incorporates complaints in relation to the Social Work
service, which were previously reported separately, and also introduced a
new complaint outcome where officers can conclude a complaint as
“resolved”. 
3.4 A more detailed breakdown of performance by Service is attached at
Appendix 2. Details around the common themes of complaints, service
areas and further analysis of the root causes of complaints are provided
within Appendix 3 to this report. This additional information is provided
following a previous request from the Audit and Scrutiny committee. 
3.5 The corporate complaints procedure is administered centrally by the
Compliance and Regulatory team within Legal and Regulatory Support,
Page 81 Agenda Item 8

Page 82

and quarterly performance reports are provided to departmental
management. Performance reports are published on the Council’s
website:  Complaints | Argyll and Bute Council (argyll-bute.gov.uk)
although some reports have not been uploaded this year due to the
website upgrade. 
3.6 The Compliance and Regulatory team produce monthly performance
update reports, which are circulated to all Heads of Service and
Directors, to draw attention to any areas where complaints performance
may be falling. This includes detailed information, including the ward area
and reasons for late response. 
4.0 CONCLUSION 
4.1 The Council has dealt with complaints it has received in accordance with
the requirements of the complaints handling procedure and has complied
with the obligation to prepare an annual report. Once it has been
presented to the Audit and Scrutiny Committee, the annual report will be
published on the Council’s website.   
5.0 IMPLICATIONS 
5.1 Policy None
5.2 Financial  None
5.3 Legal   Statutory requirement to prepare report
5.4 HR None
5.5 Fairer Scotland Duty:
5.5.1 Equalities
5.5.2 Socio-Economic Duty
5.5.3 Islands 
None
None
None
5.6 Climate Change None
5.7 Risk  None
5.8 Customer Service None
5.9 The Rights of the Child (UNCRC) None 
Douglas Hendry
Executive Director with responsibility for Legal and Regulatory Support
18 August 2024 
Policy Lead – Councillor Mark Irvine.                                                  
For further information contact: Iain Jackson, Governance, Risk and Safety
Manager 01546 604188 
APPENDICES 
Appendix 1 – Annual Complaints Report 2023-24 
Appendix 2 – Service Breakdown 
Appendix 3 – Themes of Complaints
Page 82

Page 83

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil … 
.
ANNUAL COMPLAINTS
ANNUAL COMPLAINTS
PERFORMANCE
REPORT 2023/24
Page 83

Page 84

Page 2 
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Contents 
Chief Executive’s Foreword ...................................................................................... 3
Introduction ............................................................................................................... 4
Complaints Process .................................................................................................. 5
Indicator 1 – Complaints Received per 1,000 of Population ...................................... 6
Indicator 2 – Number of Complaints .......................................................................... 7
Indicator 3 – Complaint Outcomes Stage 1 ............................................................... 8
Indicator 3 – Complaint Outcomes Stage 2 ............................................................... 9
Indicator 3 – Complaint Outcomes Escalated Complaints ....................................... 10
Indicator 4 – Average Times ................................................................................... 11
Indicator 5 – Performance Against Timescales ....................................................... 13
Indicator 6 – Extensions to Timescales ................................................................... 15
Indicator 7 – Customer Satisfaction ........................................................................ 16
Indicator 8 – Learning from Complaints – Reporting ............................................... 17
Indicator 8 – Learning from Complaints – Improvements ........................................ 18
Complaints Investigated by the SPSO .................................................................... 19
Complaint Themes .................................................................................................. 20
Positive Feedback ................................................................................................... 22
Contact Us .............................................................................................................. 24 
Page 84

Page 85

Page 3  
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Chief Executive’s Foreword 
I am pleased to present Argyll and Bute Council’s
Annual Complaints Report, which provides
information about our performance in handling
complaints from our customers between 1 April
2023 and 31 March 2024. 
Argyll and Bute Council is committed to providing
high quality services for residents, businesses
and visitors in our area and an important part of this commitment is to ensure we
have effective processes in place to resolve matters when things go wrong. 
We strive to be thorough, transparent, objective and fair in our approach to
complaints, and to make it as easy as possible for customers to access our
complaints procedure through our website, by email, over the telephone or in
person. 
I understand it can be disappointing and frustrating when your expectations’ are not
met but we welcome and value complaints and feedback from our customers as it
allows us to learn from the issues reported to us to improve the quality of the
services we provide. 
Some examples of those improvements made are included within this report. 
It has been a challenging year and I thank all the staff in my organisation for doing
what they do best and going the extra distance to provide the best possible services
and support to the people of Argyll and Bute. 
Pippa Milne
Chief Executive – Argyll and Bute Council 
Page 85

Page 86

Page 4 
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Introduction 
Argyll and Bute Council, along with all other Scottish Local Authorities, follow a
model complaints handling procedure which is determined by the Scottish Public
Sector Ombudsman (SPSO). This report presents how Argyll and Bute Council has
performed against eight key performance indicators set by the SPSO that are used
by all 32 local authorities, and provides some details about improvements to our
services, along with some positive feedback from our customers. 
Complaints process 
Complaints can be either Stage 1, which are usually straightforward issues and
must be dealt within 5 days or less, or Stage 2, which are usually about more
complex or serious issues and can take up to 20 days for a response to be provided. 
If a customer is not happy with a Stage 2 response, they can refer their complaint on
to the SPSO, who will look at the issues raised and can investigate the matter. 
Stage 1       Stage 2     SPSO
In most cases, a complaint will be made because the customer considers that the
Council has: 
• Done something wrong
• Failed to live up to expectations
• Treated someone badly or unfairly 
The process map on the following page outlines our process. 
What is a complaint?
A complaint is ‘an expression of dissatisfaction about the Council’s action or lack
of action, or about the standard of service provided by or on behalf of the
Council’.   
Page 86

Page 87

Page 5  
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Complaints Process 
Page 87

Page 88

Page 6 
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
INDICATOR 1 – COMPLAINTS RECEIVED PER 1,000 OF
POPULATION 
This section details the total number of complaints handled by Argyll and Bute
Council between 1 April 2023 and 31 March 2024. To allow a fair comparison to be
made across all 32 Scottish councils, this indicator looks at the figure of “complaints
per 1,000 of population”. 
This means there were 9.1 complaints per 1,000 population, or roughly 1 resident
in 110 made a complaint about our services. A comparison of this indicator over the
past 3 years is shown in the table below.  
Year No. of Complaints Complaints Per 1,000 Population 
2023/24 781 9.1
2022/23 686 8.0
2021/22 700 8.2  
In 2023/2024 Argyll and Bute
received, processed and closed
781 
complaints.   
The population of Argyll and Bute
is estimated at around 
86,220   
Page 88

Page 89

Page 7  
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
INDICATOR 2 – NUMBER OF COMPLAINTS 
This indicator provides information about the number of complaints closed at Stages
1 and 2, and the escalated complaints (when a customer is not satisfied with a stage
1 response, and it goes on to be dealt with as stage 2).    
544 complaints were closed at Stage 1 – 70% 
163 complaints were closed at Stage 2 – 21% 
74 complaints were closed after escalation – 9% 
12 complaints were not closed at Stage 1 within 10 days and were escalated to
Stage 2  
The graph below shows a comparison between the number of complaints received
at each stage over the past 3 years. 
544
163
74
467
138
81
499
141
60
0 100 200 300 400 500 600
Stage 1
Stage 2
Escalated
No. of Complaints
2021/22 2022/23 2023/24
Page 89

Page 90

Page 8 
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
INDICATOR 3 – COMPLAINT OUTCOMES STAGE 1 
With every complaint, we contact the customer and explain what the outcome of
their complaint was — Upheld, Not Upheld or Partially Upheld — and provide details
about how this decision was made.  The charts below provide a comparison of the
outcomes for this year, and over the past 3 years.  The “resolved” outcome was
introduced with the new complaints handling procedure in April 2021, and is used
when positive action can be taken to resolve the issue for the customer.   
Upheld
28%
Partially
Upheld
24%
Not Upheld
37%
Resolved
11%
2023/2024 Outcomes
148
131
157
130
101 107
197
172 159
57 49 66
2023/24 2022/23 2021/22
Stage 1 Outcomes - 3 Year Comparison
Upheld Partially Upheld Not Upheld Resolved
148 complaints were Upheld at
Stage 1 – 33%
130 complaints were Partially
Upheld at Stage 1 – 29%
197 complaints were Not Upheld
at Stage 1 – 43%
57 complaints were Resolved at
Stage 1 – 13% 
Page 90

Page 91

Page 9  
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
INDICATOR 3 – COMPLAINT OUTCOMES STAGE 2 
Upheld
14%
Partially
Upheld
40%
Not Upheld
45%
Resolved
1%
2023/2024 Outcomes
23 22 24
63
55
65
72
55
49
1 5 3
2023/24 2022/23 2021/22
Stage 2 Outcomes - 3 Year Comparison
Upheld Partially Upheld Not Upheld Resolved
23 Complaints were Upheld at
Stage 2 – 17%
63 Complaints were Partially
Upheld at Stage 2 – 46%
72 Complaints were Not Upheld
at Stage 2 – 53%
1 Complaints were Resolved at
Stage 2 – 1% 
Page 91

Page 92

Page 10 
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
INDICATOR 3 – COMPLAINT OUTCOMES ESCALATED
COMPLAINTS 
When a customer is not happy with a Stage 1 response, it is dealt with as a Stage 2
complaint — these are known as “Escalated Complaints”.   
Upheld
30%
Partially
Upheld
24%
Not Upheld
45%
Resolved
1%
2023/24 - Outcomes
22
25
16
18 17 16
33
37
27
1 2 1
2023/24 2022/23 2021/22
Escalated Outcomes - 3 Year Comparison
Upheld Partially Upheld Not Upheld Resolved
22 complaints were Upheld after
escalation - 27%
18 complaints were Partially
Upheld after escalation – 22%
33 complaints were Not Upheld
after escalation – 41%
1 complaint was Resolved after
escalation – 1%
Page 92

Page 93

Page 11  
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
INDICATOR 4 – AVERAGE TIMES 
Stage 1 – We aim to respond to and close all Stage 1 complaints within 5 working
days. In 2023/2024, we closed 532 complaints at Stage 1, with a total sum of 2,337
working days used to close them. Our average time to close a Stage 1 complaint
was 4.4 working days. 
The figures for the last 3 years can be seen in the table below.  
Year No. of Complaints Closed Total Days  Average Time (days)
2023/24 532 2337 4.4
2022/23 453 1,995 4.4
2021/22 489 1,999 4.1 
Stage 2 – We aim to respond to and close all Stage 2 complaints within 20 working
days. In 2023/2024, we closed 159 complaints at Stage 2, with a total sum of 3,587
working days used to close them. Our average time to close a Stage 2 complaint
was 22.6 working days. 
The figures for the last 3 years can be seen in the table below.  
Year No. of Complaints Closed Total Days  Average Time (days)
2023/24 159 3,587 22.6
2022/23 137 2367 17.3
2021/22 141 3,107 22 
Monthly performance reporting is provided to all Heads of Service, Directors and
Complaints Officers to allow them to take action with their Services if required. 
Page 93

Page 94

Page 12 
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Indicator 4 – Average Times 
After Escalation – in 2023/2024, we closed 74 escalated complaints after
Escalation, with a total sum of 1,643 working days. Our average time to close a
complaint after Escalation was 22.2 working days. 
The last three year’s results can be seen below.  
Year No. of Complaints Closed Total Days  Average Time (days)
2023/24 74 1,643 22.2
2022/23 81 1671 20.6
2021/22 60 954 15.9 
Page 94

Page 95

Page 13  
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
INDICATOR 5 – PERFORMANCE AGAINST TIMESCALES 
Stage 1 – We aim to respond to and close all Stage 1 complaints within 5 working
days. In 2023/2024, we closed 532 complaints at Stage 1 with 442 of these within
timescale, or 83%. 37 (7%) were closed after an extension was agreed with the
customer.   
No. of Complaints Closed Within Timescale  % No. with Extension %
2023/24 532 442 83% 37 7%
2022/23 453 370 82% 23 5%
2021/22 489 411 84% 11 2% 
Stage 2 – we aim to respond to and close all Stage 2 complaints within 20 working
days. In 2023/2024, we closed 159 complaints at Stage 2, with 100 of these within
timescale, or 63%. 38 (24%) were closed after an extension was agreed with the
customer.   
No. of Complaints Closed Within Timescale  % No. with Extension %
2023/24 159 100 63% 38 24%
2022/23 137 65 47% 33 24%
2021/22 141 93 66% 35 25% 
Complaints with extensions agreed do not count as within timescale, these are 
reported as late responses. 
Page 95

Page 96

Page 14 
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Indicator 5 – Performance Against Timescales 
After Escalation – in 2023/2024, we closed 74 complaints after Escalation, with 44
of these within timescale, or 59%. 12 (16%) were closed after an extension was
agree with the customer.   
No. of Complaints Closed Within Timescale  % No. with Extension %
2023/24 74 44 59% 12 16%
2022/23 81 46 57% 23 28%
2021/22 60 48 80% 8 13% 
Page 96

Page 97

Page 15  
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
INDICATOR 6 – EXTENSIONS TO TIMESCALES 
Part of the complaints handling procedure includes the option to seek an extension
to the usual 5 or 20 day timescale, which should be agreed with the customer. This
indicator reports the number and percentage of complaints at each stage which
were closed after an extension to the 5 or 20 day timeline was authorised. 
Stage 1
37 Extensions agreed
7% of total complaints   
Escalated complaints
12 extensions agreed
16% of total complaints     
Stage 2
38 extensions agreed
24% of total complaints     
Page 97

Page 98

Page 16 
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
INDICATOR 7 – CUSTOMER SATISFACTION 
Our customers are automatically issued with a short complaints process satisfaction
survey once their complaint has been closed. The survey asks for feedback about
the complaints process, and gives an opportunity to send us suggestions for
improvements.  The survey results are reviewed by the Complaints Co-ordinators
quarterly, and the feedback can be used to improve how we handle complaints. 
We received 86 responses to our survey during the year, which is just over 15% of
all complaints received. A low response rate makes it difficult to get an accurate
picture of how all of our customers feel about the complaints process. 
68% of customers indicated that they found it easy to make a complaint 
58% of customers indicated they were told if the response was going to take
longer than the set timescales 
64% of customers indicated that information about the complaints procedure was
easily accessible. 
58% of customers indicated that they were given the opportunity to fully explain
their complaint.   
From our review of the feedback provided through the surveys, we recognise that
customers are often frustrated when an ongoing issue is not resolved through the
complaints process.  
Page 98

Page 99

Page 17  
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
INDICATOR 8 – LEARNING FROM COMPLAINTS –
REPORTING 
Who looks at our complaints figures and trends? 
Information about complaints figures and corrective action taken is reported
regularly to senior managers and a quarterly report is submitted to the Strategic
Management Team. This process ensures the appropriate level of scrutiny takes
place.  
Quarterly performance against the performance indicators is reported to the Local
Authority Complaints Handlers Network (LACHN). 
We are also required to report our complaints figures to the Scottish Public Service
Ombudsman (SPSO) by publishing our annual report.    
How we report Complaints Performance and Trends to our Customers 
We publish the quarterly and annual reports on our website: Complaints | Argyll and
Bute Council (argyll-bute.gov.uk)   
Page 99

Page 100

Page 18 
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
INDICATOR 8 – LEARNING FROM COMPLAINTS –
IMPROVEMENTS 
By dealing with complaints on a day-to-day basis, our Officers are able to make
adjustments to processes when issues are raised. In general, no major policy or
procedural changes were required in response to complaints, however, a number of
minor changes or actions were taken in order to improve our services. Whilst these
improvements may have been minor in the overall scale of activities within the
Council, it is our hope that they have made significant changes to the quality of
service received by our customers. Examples of some of these changes are shown
below: 
Departmental Complaints Co-ordinators attend regular meetings where learning
points from the SPSO are shared and discussed. The feedback and suggestions
from customer satisfaction surveys are also reviewed, and any potential
improvement ideas are investigated and taken forward where appropriate.   
Customer wanted to make a complaint about the unfair and limited notice given in relation to double
Council Tax liability for second homes. Complaint Fully Upheld – Customer advised that the decision to
double the council tax charge is indeed part of our ongoing efforts to address the issue of affordable
housing. A sizeable proportion of the revenue generated from this increase will be specifically allocated
to funding affordable housing schemes in the local communities. These initiatives aim to provide
opportunities for individuals and families in need of affordable accommodation, thereby contributing to
a more inclusive and sustainable housing landscape. The Council could have given second homeowners
increased notice of its intention to double the Council Tax on second homes if the powers to do so were
to be given to the Council in law. In future, under similar circumstances the Council will write to those
affected by such changes and give them increased notice of potential increasing in tax liabilities 
Customer complaint in relation to child with Additional Support Needs who was experiencing
difficulties in school including with children in connection with a social media post that had been made
about them. Partially Upheld – While the incident did not take place in school there were indications
within the social media post that photos may have been taken of the child while in school grounds. The
school advised all pupils that mobiles phones must not be used on site including before or after school.
Letters were sent to all parents informing that mobile phones may not be used on school premise and
also requested that they discuss data protection with their children. Police Scotland were also invited to
the school to deliver a safety workshop on social media usage. 
Page 100

Page 101

Page 19  
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
COMPLAINTS INVESTIGATED BY THE SPSO 
When a customer is not satisfied with our final response to a complaint, they can
take it to the Scottish Public Service Ombudsman (SPSO) and ask for the complaint
to be investigated. The SPSO is the final arbiter for complaints about public
services. 
Cases passed to SPSO during 2023/2024 
21 cases were received by the SPSO in relation to Argyll and Bute Council in
2023/2024.   
The SPSO publishes reports about all the organisations it has involvement with.
More information is available from Statistics 2023-24 | SPSO    
5 – Advice (not progressed) - 1 was
mature (complaint was out with the
time period for raising the
complaint), 2 were premature
(complainant contacted the SPSO
before progressing through full
complaints process) and 2 were
enquiries. 
15 - resolved early (not investigated) —
the SPSO asks the Council to provide
information in connection with the
complaint, from that the investigating
officer decides whether the complaint
should be pursued further. The reasons
provided for not proceeding to an
investigation were “Good Complaint
Handling” and “Insufficient benefit would
be achieved”. 
1 – Investigation - complaint
currently being investigated by
the SPSO in which we are still
awaiting a decision. 
Page 101

Page 102

Page 20 
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
COMPLAINT THEMES 
We record information about what type of complaints we receive, and have a standard set of
categories that complaints generally fall into. The chart below shows how the complaints
received have been classified during 2023-24. 
*Note – the total here does not directly correspond with the total number of complaints, due to how escalated
complaint categories are recorded 
20
44
18
155
42
296
138
0 50 100 150 200 250 300 350
Damage/Injury
Inadequate Information
Late Delivery
Non Delivery
Policy Restriction
Substandard Delivery
Unacceptable Behaviour
Number of Complaints
Page 102

Page 103

Page 21  
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
We have also captured information about what we believe the main theme of each
complaint to be. This information will be provided (along with other levels of
analysis) to our Elected Members and Senior Management to allow them to take this
into consideration when making policy and service decisions. The chart below
shows the main issues we have received complaints about. It includes all complaints
where we received 5 or more in connection with a particular issue.   
64
57
46
44
38
32
31
29
29
26
25
23
22
20
17
14
11
10
9
9
9
8
8
8
7
7
6
6
6
5
5
5
5
5
0 10 20 30 40 50 60 70
Staff Issue - Conduct
Council Decision
Education - Treatment of Child
Social Work Decisions
Staff Issue - Communication
Planning Applications
Council Property/Buildings
Education - Other
Missed Bin
Council Tax Other
Council Service Error
Domestic Refuse Collection
Parking Services
Traffic Management
Street Lighting
Staff Issue - Other
Ground Maintenance
Road Works
Failure of Care
Live Argyll - Other
Pothole
Recycling
Quality of Care
Social Work Reports
Cemeteries
Public Conveniences
Surfacing
Commercial Refuse
Pavements/Footpaths
Road Closure
Winter Maintenance
Road Signage
Drainage
Public Transport
No. of Complaints
Page 103

Page 104

Page 22 
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
POSITIVE FEEDBACK 
Was a pleasure to deal with Argyll & Bute Council today, super professional, super-efficient got the
job done. Brilliant, thank you very much
My call was quickly answered and was dealt with very professionally and very competently. Greatly
appreciated being able to talk to someone to deal with this. Thank you very much
We have worked only once with Argyll & Bute Council but found the process easy, communication
and feedback was great.
The girl that answered was very, very, good, she was very good at what she did, she was very
cheerful you could even tell she was smiling in her voice. She was professional, she was brilliant,
she needs a pay rise - give her one. Thank you very much
Here is just a small extract of the positive
feedback that we have received this year. It
is important to recognise that excellent
services are being delivered, often in very
challenging circumstances.   
I dealt with her throughout the process from booking dates to the collection of our marriage
certificate. I really cannot say enough about how friendly, professional and kind she was in all my
dealings with her and she made our ceremony special and personal. I always thought that a civil
ceremony might not be as special as a church service but the registrar proved me completely
wrong and she will always have a special place in our hearts.
Page 104

Page 105

Page 23  
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil … 
I was really happy because I was trying to find this information on your website and it's not your fault
as my internet is painfully slow at the moment. The lady I spoke to was not only extremely helpful she
offered to email it over to me so she's going to send me the information which is a great help. Thank
you very much.  
Your operator was very, very nice, very polite and resolved my query very quickly and no problem
whatsoever. It was a very easy and short call and I was pleased with the outcome. Thank you very
much indeed.
I would just like to say that any time I have phoned this number the staff have been excellent. That's all I
wanted to say. Thank you.
I have a reading and writing disability, the person who answered my call was more than helpful with my
enquiry and was also willing to help with other questions that I had. More than helpful, it was a pleasant
experience. Thank you.
It was delightful to speak to a human being and the enquiry was sorted out within seconds or minutes. It
was a delight to deal with the Argyll & Bute office
I was very emotional and upset when I phoned and found a very helpful young lady on the other end of
the phone who calmed me down and could find ways of moving my problem forward and that someone
will phone me back and I'll be able to discuss it. I found that very helpful. Thank you.
Page 105

Page 106

Page 24 
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
CONTACT US 
Thank you for looking at our annual complaints report for 2023-24. If you would like
to know more about our complaints procedure, details can be found on our website:   
https://www.argyll-bute.gov.uk/my-council/complaints  
Or you can contact us using any of the methods below.  
Phone – 01546 605522 
Text – 07860023933 
Post – Argyll and Bute Council, Kilmory, Lochgilphead, Argyll, PA31 8RT 
Email - enquiries@argyll-bute.gov.uk  
Online - https://www.argyll-bute.gov.uk/my-council/how-contact-us   
Page 106

Page 107

Department Stage 1 
complaints
Responded to 
within 
timescale
Upheld Partially 
upheld
Not 
upheld
Resolved Stage 2 
complaints
Responded 
to within 
timescale
Upheld Partially 
upheld
Not 
upheld
Resolved
Chief Executives
Directorate 0 0 0 0 0 0 1 1 0 1 0 0
Community Development & Planning 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 1 1 0 1 0 0
% within timescale ‐ 100%
Development & Infrastructure
Directorate 0 0 0 0 0 0 0 0 0 0 0 0
Financial Services 38 37 16 3 15 4 9 9 1 2 6 0
Development & Economic Growth 63 38 14 12 19 15 19 8 1 5 13 0
Roads and Infrastructure 235 190 85 56 80 8 87 71 26 16 44 1
Customer Support 12 11 1 3 4 4 1 1 0 1 0 0
Total 348 276 116 74 118 31 116 89 28 24 63 1
% within timescale 79% 77%
Customer Services
Directorate 1 1 0 0 0 1 1 1 0 0 1 0
Legal & Regulatory  8 7 1 1 5 1 7 7 1 1 5 0
Commercial Services 73 71 5 30 38 0 1 1 0 0 1 0
Education 38 31 7 16 14 1 54 45 10 26 18 0
Total 120 110 13 47 57 3 63 54 11 27 25 0
% within timescale 92% 86%
Health & Social Care Partnership
Adult Care ‐ Older Adults/Community Hospitals 19 15 2 0 5 11 17 5 1 8 4 0
Adult Care ‐ MH, LD, Addictions & Lifelong Conditions 15 12 3 1 5 5 16 2 4 5 6 1
Children and Families & Criminal Justice 29 21 1 8 12 7 24 9 1 16 7 0
Total 63 48 6 9 22 23 57 16 6 29 17 1
% within timescale 76% 28%
Live Argyll
Live Argyll 13 8 13 0 0 0 0 0 0 0 0 0
Total 13 8 13 0 0 0 0 0 0 0 0 0
% within timescale 62% ‐
Overall totals 544 442 148 130 197 57 237 160 45 81 105 2
% within timescale 81% 68%
Annual complaints figures 2023/24
Page 107

Page 108

This page is intentionally left blank

Page 109

Page 1 Annual Complaints Report 2023-24 Appendix 3 
Annual Complaints Performance 2023-24 
This report provides additional details to accompany the full annual complaints report for 2023-24, which is based on
the 8 indicators set by the Scottish Public Service Ombudsman (SPSO). 
1. All Complaints listed by theme 
Complaint theme Number
Council Payments 3
Piers & Harbours 3
Non Domestic Rates 3
Civic Amenity 3
Litter 3
Committee/Governance 2
Core Paths 2
Projects, Renewables &
Regeneration
2
Data Protection 2
Public Health 2
Payroll 2
Leisure Services 2
Building Warrants 2
Dangerous Buildings 2
Benefit Payments 1
Private Water Supplies 1
Local Development Plan 1
School Crossings 1
Animal Health 1
Council Tax Portal 1
School Catering 1
Scottish Welfare Fund 1
HR Policy/Process 1
Care Funding 1
Respite 1
Licensing 1
Education - Attendance Panel 1 
Table 1 provides a full breakdown of complaints into
relevant themes. From the data in the complaints
system, we have assigned each case a theme, based
on our understanding of the main issue raised in the
complaint. Where complaints have been in connection
with a number of issues, or could fall into various
themes, we have assigned it the theme we believe to
be the main issue. The larger themes are explored
further within this report.
Complaint theme Number
Staff Issue - Conduct 64
Council Decision 57
Education - Treatment of Child 46
Social Work Decisions 44
Staff Issue - Communication 38
Planning Applications 32
Council Property/Buildings 31
Education - Other 29
Missed Bin 29
Council Tax Other 26
Council Service Error 25
Domestic Refuse Collection 23
Parking Services 22
Traffic Management 20
Street Lighting 17
Staff Issue - Other 14
Ground Maintenance 11
Road Works 10
Failure of Care 9
Live Argyll - Other 9
Pothole 9
Recycling 8
Quality of Care 8
Social Work Reports 8
Cemeteries 7
Public Conveniences 7
Surfacing 6
Commercial Refuse 6
Pavements/Footpaths 6
Road Closure 5
Winter Maintenance 5
Road Signage 5
Drainage 5
Public Transport 5
Homelessness Service 4
School Transport 4
Flooding 4
Noise Control 3
Cost of Council Service 3
Road Markings 3
Page 109

Page 110

Page 2 Annual Complaints Report 2023-24 Appendix 3 
2. General breakdown by complaint category and department 
Details about some of the larger themes / areas of complaints are provided in this section.  A more in depth
breakdown within the main service areas is provided at section 4 below 
Table 1 – Categories of complaints by department  
Chief Executive’s Unit
& Community
Planning
Education,
Legal &
Regulatory &
Commercial
Customer Support,
Financial Services, Road
& Infrastructure and
Development &
Economic Growth
Health and
Social Care
Partnership
Live
Argyll
Damage/Injury  1 17 1 1
Inadequate
Information
6 4 26 7 1
Late Delivery 2 1 14  1
Non Delivery  27 119 8 1
Policy Restriction 2 8 28 3 1
Substandard
Delivery
9 93 140 48 6
Unacceptable
Behaviour
1 44 52 39 2
Grand Total 20 178 396 106 13 
Table 2 – Number of complaints by area 
Details of complaint themes within ward areas are provided below. 
Area Count of Ward
Area
Bute and Cowal 152
Helensburgh and Lomond 234
Mid Argyll Kintyre and the Islands 157
Oban Lorn and the Isles 166
Area Not Identified 4
Grand Total 713 
Page 110

Page 111

Page 3 Annual Complaints Report 2023-24 Appendix 3 
Section 3 – Complaints themes by Area 
Table 3a Mid Argyll, Kintyre and Islands   
Theme Count of Ward Area
Education - Treatment of Child 24
Staff Issue - Conduct 22
Social Work Decisions 16
Council Tax Other 9
Staff Issue - Communication 8
Education - Other 7
Missed Bin 7
Council Service Error 6
Planning Applications 6
Council Decision 5
Social Work Reports 4
Domestic Refuse Collection 4
Failure of Care 4
Quality of Care 4
Street Lighting 3
Recycling 3
Staff Issue - Other 2
Core Paths 2
Public Transport 2
Pothole 2
Parking Services 2
Public Health 1
Cemeteries 1
Drainage 1
Commercial Refuse 1
Committee/Governance 1
Flooding 1
Scottish Welfare Fund 1
Ground Maintenance 1
Non Domestic Rates 1
Road Closure 1
Payroll 1
Road Signage 1
Data Protection 1
Road Works 1
School Transport 1
Grand Total 157   
Page 111

Page 112

Page 4 Annual Complaints Report 2023-24 Appendix 3 
3b Oban, Lorn and the Isles
Theme Count of Ward
Area
Council Property/Buildings 29
Staff Issue - Conduct 13
Social Work Decisions 10
Parking Services 9
Missed Bin 8
Staff Issue - Communication 8
Council Service Error 7
Education - Other 6
Education - Treatment of Child 6
Public Conveniences 5
Planning Applications 5
Winter Maintenance 5
Cemeteries 4
Staff Issue - Other 4
Commercial Refuse 3
Domestic Refuse Collection 3
Street Lighting 3
Ground Maintenance 3
Council Decision 3
Dangerous Buildings 2
Surfacing 2
Pothole 2
Cost of Council Service 2
Road Works 2
Council Tax Other 2
Non Domestic Rates 2
Piers & Harbours 2
Projects, Renewables & Regeneration 1
Failure of Care 1
Animal Health 1
Public Transport 1
Local Development Plan 1
Quality of Care 1
Data Protection 1
Recycling 1
Pavements/Footpaths 1
Road Signage 1
Council Tax Portal 1
Noise Control 1
Traffic Management 1
School Catering 1
Benefit Payments 1
School Transport 1
Grand Total 166   
Page 112

Page 113

Page 5 Annual Complaints Report 2023-24 Appendix 3 
3c Bute and Cowal 
Theme Count of Ward Area  Theme Count of Ward Area
Staff Issue - Conduct 16  Building Warrants 1
Traffic Management 15  Piers & Harbours 1
Education - Treatment of Child 9  Grand Total 152
Social Work Decisions 8   
Education - Other 7   
Planning Applications 7   
Staff Issue - Communication 6   
Street Lighting 6   
Council Tax Other 5   
Council Decision 4   
Council Service Error 4   
Pothole 4   
Failure of Care 3   
Staff Issue - Other 3   
Recycling 3   
Live Argyll - Other 3   
Domestic Refuse Collection 3   
Quality of Care 3   
Social Work Reports 2   
Public Transport 2   
Council Payments 2   
Civic Amenity 2   
Homelessness Service 2   
Road Closure 2   
Parking Services 2   
Road Signage 2   
Ground Maintenance 2   
Road Works 2   
Surfacing 2   
School Transport 2   
Missed Bin 2   
Pavements/Footpaths 2   
Drainage 1   
Projects, Renewables & Regeneration 1   
Cost of Council Service 1   
Respite 1   
Care Funding 1   
Commercial Refuse 1   
Committee/Governance 1   
Road Markings 1   
Private Water Supplies 1   
Noise Control 1   
Public Health 1   
Council Property/Buildings 1   
Licensing 1   
Page 113

Page 114

Page 6 Annual Complaints Report 2023-24 Appendix 3 
3d Helensburgh and Lomond 
Theme Count of Ward
Area 
Failure of Care 1
Council Decision 45  Recycling 1
Staff Issue - Communication 16  School Crossings 1
Planning Applications 14  HR Policy/Process 1
Domestic Refuse Collection 13  Council Property/Buildings 1
Staff Issue - Conduct 12  Pothole 1
Missed Bin 12  Grand Total 234
Social Work Decisions 10   
Council Tax Other 10   
Education - Other 9   
Council Service Error 8   
Parking Services 7   
Education - Treatment of Child 7   
Live Argyll - Other 6   
Road Works 5   
Staff Issue - Other 5   
Ground Maintenance 5   
Street Lighting 5   
Traffic Management 4   
Litter 3   
Flooding 3   
Pavements/Footpaths 3   
Drainage 3   
Homelessness Service 2   
Road Markings 2   
Road Closure 2   
Social Work Reports 2   
Leisure Services 2   
Public Conveniences 2   
Surfacing 2   
Cemeteries 2   
Education - Attendance Panel 1   
Noise Control 1   
Civic Amenity 1   
Commercial Refuse 1   
Building Warrants 1   
Road Signage 1   
Council Payments 1   
Page 114

Page 115

Page 7 Annual Complaints Report 2023-24 Appendix 3 
3e Top 10 complaint themes, broken down by ward area 
Theme Bute and
Cowal
Helensburgh
and Lomond
Mid Argyll Kintyre
and the Islands
Oban Lorn
and the Isles
Grand
Total
Staff Issue - Conduct 16 12 22 13 63
Council Decision 4 45 5 3 57
Education - Treatment of Child 9 7 24 6 46
Social Work Decisions 8 10 16 10 44
Staff Issue - Communication 6 16 8 8 38
Planning Applications 7 14 6 5 32
Council Property/Buildings 1 1  29 31
Education - Other 7 9 7 6 29
Missed Bin 2 12 7 8 29
Council Tax Other 5 10 9 2 26
Grand Total 65 136 104 90 395 
*1 entry for unidentified area removed 
Section 4 – Service breakdown by area and theme 
Table 4a – Chief Executives Unit, Community Planning and Development 
Theme Bute and
Cowal
Helensburgh
and Lomond
Mid Argyll Kintyre
and the Islands
Oban Lorn
and the Isles
Grand
Total
Council Decision   2 2 4
Council Service Error 1    1
Council Tax Other 2 4 2 2 10
Council Tax Portal    1 1
Non Domestic Rates   1 2 3
Staff Issue - Other    1 1
Grand Total 3 4 5 8 20 
Page 115

Page 116

Page 8 Annual Complaints Report 2023-24 Appendix 3 
Table 4b – Education, Legal and Regulatory Support, Commercial Services 
Theme  Bute and
Cowal
Helensburgh
and Lomond
Mid Argyll Kintyre
and the Islands
Oban Lorn
and the Isles
Grand Total
Committee/Governance 1  1  2
Council Decision 2 41 1 1 45
Council Property/Buildings 1 1  29 31
Data Protection   1 1 2
Education - Attendance Panel  1   1
Education - Other 7 9 7 6 29
Education - Treatment of Child 9 7 24 6 46
Flooding  1   1
Licensing 1    1
Litter  1   1
Noise Control  1   1
Parking Services  1   1
School Catering    1 1
Scottish Welfare Fund   1  1
Staff Issue - Communication   1  1
Staff Issue - Conduct 1  8 2 11
Staff Issue - Other  2 1  3
Grand Total 22 65 45 46 178 
Table 4c – Customer & Support Services 
Theme Bute and Cowal Helensburgh and
Lomond
Mid Argyll
Kintyre and the
Islands
Oban Lorn
and the
Isles
Grand
Total
Council Decision  1   1
Council Service Error 1 1 1 2 5
HR Policy/Process  1   1
Parking Services   1  1
Staff Issue - Communication 1  1 2 4
Staff Issue - Conduct   1  1
Grand Total 2 3 4 4 13 
Table 4d – Financial Services 
Theme Bute and
Cowal
Helensburgh
and Lomond
Mid Argyll Kintyre
and the Islands
Oban Lorn
and the Isles
Area Not
Identified
Grand
Total
Benefit Payments    1  1
Council Payments 1     1
Council Tax Other 3 6 7   16
Payroll   1  1 2
Staff Issue - Conduct 1     1
Grand Total 5 6 8 1 1 21 
Page 116

Page 117

Page 9 Annual Complaints Report 2023-24 Appendix 3 
Table 4e – Roads & Infrastructure Services 
Theme Bute and
Cowal
Helensburgh
and Lomond
Mid Argyll Kintyre
and the Islands
Oban Lorn
and the Isles
Area Not
Identified
Grand
Total
Cemeteries  2 1 4  7
Civic Amenity 2 1    3
Commercial Refuse 1 1 1 3  6
Council Decision 2 2 1   5
Council Payments  1    1
Council Service Error 2 7 4 5  18
Domestic Refuse
Collection
3 13 4 3  23
Drainage 1 3 1   5
Flooding  2 1   3
Ground Maintenance 2 5 1 3  11
Litter  2    2
Missed Bin 2 12 7 8  29
Parking Services 2 6 1 9 2 20
Pavements/Footpaths 2 3  1  6
Piers & Harbours 1   2  3
Pothole 4 1 2 2  9
Public Conveniences  2  4  6
Public Transport 2  2 1  5
Recycling 3 1 3 1  8
Road Closure 2 2 1   5
Road Markings 1 2    3
Road Signage 2 1 1 1  5
Road Works 2 5 1 2  10
School Crossings  1    1
School Transport 2  1 1  4
Staff Issue -
Communication 
3 2 1  6
Staff Issue - Conduct 9 8 4 8  29
Staff Issue - Other  2  1  3
Street Lighting 6 5 3 3  17
Surfacing 2 2  2  6
Traffic Management 15 4  1  20
Winter Maintenance    5  5
Grand Total 70 99 42 71 2 284 
Page 117

Page 118

Page 10 Annual Complaints Report 2023-24 Appendix 3 
Table 4f – Development and Economic Growth
Row Labels Bute and
Cowal
Helensburgh and
Lomond
Mid Argyll Kintyre
and the Islands
Oban Lorn
and the Isles
Grand
Total
Animal Health    1 1
Building Warrants 1 1   2
Core Paths   2  2
Cost of Council Service    2 2
Council Decision   1  1
Council Service Error   1  1
Dangerous Buildings    2 2
Homelessness Service 2 2   4
Local Development Plan    1 1
Noise Control 1   1 2
Planning Applications 7 14 6 5 32
Private Water Supplies 1    1
Projects, Renewables &
Regeneration
1 1 2
Public Conveniences    1 1
Public Health 1  1  2
Staff Issue - Communication 3 9 3 2 17
Staff Issue - Conduct    1 1
Staff Issue - Other 1 1 1 1 4
Grand Total 18 27 15 18 78 
Health and Social Care Partnership
Table 5a – Area breakdown
Service Bute and
Cowal
Helensburgh
and Lomond
Mid Argyll Kintyre
and the Islands
Oban Lorn
and the Isles
Area Not
Identified
Grand
Total
Acute and Complex Care 8 3 12 4  27
Children and Families 8 13 16 6  43
Criminal Justice 1  1 1  3
Health and Community Care 11 5 9 7 1 33
Grand Total 28 21 38 18 1 106 
Page 118

Page 119

Page 11 Annual Complaints Report 2023-24 Appendix 3 
Table 5b – Area & Theme breakdown 
Bute and
Cowal
Helensburgh
and Lomond
Mid Argyll Kintyre
and the Islands
Oban Lorn
and the Isles
Area Not
Identified
Grand
Total
Acute and Complex Care 8 3 12 4  27
Council Payments 1    1
Failure of Care 1  1 1  3
Quality of Care   2   2
Respite 1     1
Social Work Decisions 1  3 1  5
Social Work Reports  1 1  2
Staff Issue -
Communication
2 2 1 1  6
Staff Issue - Conduct 1  4 1  6
Staff Issue - Other 1    1
Children and Families 8 13 16 6  43
Council Decision  1    1
Failure of Care   1  1
Quality of Care 1    1
Social Work Decisions 3 7 8 3  21
Social Work Reports 1 1 2  4
Staff Issue -
Communication 
2 2  4
Staff Issue - Conduct 3 2 5 1  11
Criminal Justice 1  1 1  3
Social Work Decisions    1  1
Social Work Reports 1  1  2
Health and Community
Care
11 5 9 7 1 33
Care Funding 1    1
Failure of Care 2 1 2  5
Quality of Care 2  2 1  5
Social Work Decisions 4 3 5 5  17
Staff Issue - Conduct 1 1   1 3
Staff Issue - Other 1   1  2
Grand Total 21 15 12 19  67 
Notes
1. The total number of complaints does not exactly relate to the total number of themes reported, as many of
the complaints escalated from stage 1 to stage 2 represent 1 theme. 
Page 119

Page 120

This page is intentionally left blank

Page 121

ARGYLL AND BUTE COUNCIL  Audit and Scrutiny Committee
Legal and Regulatory Support  5 September 2024 
Information Requests – Annual Report 2023-24 
1.0 INTRODUCTION 
1.1 This report is to update the Committee on the position regarding the
recording, responding to, monitoring and reporting of requests for
information under the Freedom of Information (Scotland) Act 2002 (FOISA)
and the Environmental Information (Scotland) Regulations 2004 (EIR’s) for
the period between 01 April 2023 and 31 March 2024. 
2.0 RECOMMENDATIONS 
2.1 The Committee consider and note the terms of this report. 
3.0 DETAIL 
3.1 A total of 1,488 requests for information were received during the period -
1 April 2023 to 31 March 2024 which is a decrease of 7 on the number
received in 2022-23. Overall, 92% of requests received this year (1,372)
were responded to within the statutory timescale of 20 working days and
116 requests were responded to after 20 working days. These totals
include requests for information from the Health and Social Care
Partnership (Social Work) and Live Argyll. 
3.2 A breakdown by Department and detail around late responses is
provided in Appendix 1. 
3.3 There were 33 requests for review made during this period, which
equates to less than 2% of the total number of requests. 25 were
responded to within the 20 working day statutory timescale (76%), and
the 8 issued late required more time to gather information and investigate
complex issues. 
3.4 The overall response rate within timescale has decreased slightly from
94% in 2022/23 to 92% in 2023/24. As the details provided in appendix 1
show, many service areas achieved a high level of performance,
between 95-100%. It is helpful to note that 35 responses were sent out
on day 21 and 14 sent out on day 22, which if they had been issued on
time would have brought the response rate up to 95.5%. The team will
have an ongoing focus to try and assist services to avoid responses
issued late by only a day or so. In addition, while L&RS are showing as
Page 121 Agenda Item 9

Page 122

92%, the bulk of those late responses relate to requests that were
handled by L&RS but where the information requested related to other
services and sometimes multiple services where there has been a delay
in the provision of the information. 
3.5 Two cases were investigated by OSIC in 2023/24, these are currently
ongoing and are awaiting a decision from the Information Commissioner.     
3.6 The Compliance and Regulatory team continues to work with
Departments to seek to improve response rates where required, and
deliver training and provide guidance to allow officers to appropriately
respond to information requests. 
3.7 The Compliance and Regulatory team provide monthly updates to the
Chief Executive, the Chief Officer, Directors, Heads of Service and the
departmental FOI reps. Quarterly reports are provided to all DMTs. 
4.0 CONCLUSION 
4.1 Many Services maintained an excellent performance level throughout
2023/24, and the overall result of 92% of responses issued within
timescale is very positive, given the pressures on some service areas
where high numbers of information requests were received. 
4.2 The Compliance and Regulatory team continues to work with
Departments to seek to improve response rates where required, and
deliver training and provide guidance to allow officers to appropriately
respond to information requests. 
5.0 IMPLICATIONS 
5.1 Policy None
5.2 Financial  None
5.3 Legal   Possible breach of statutory requirement to
respond to requests
5.4 HR None
5.5 Fairer Scotland Duty:  None 
5.5.1 Equalities None 
5.5.2 Socio Economic Duty None 
5.5.3 Islands None
5.6 Climate Change None
5.7 Risk  None
5.8 Customer Service The relatively low number of requests for
review is indicative that we are responding
appropriately to requests and customers are
receiving the information they are looking for.
5.9 The Rights of the Child (UNCRC) None 
Page 122

Page 123

Douglas Hendry
Executive Director with responsibility for Legal and Regulatory Support 
13 August 2024 
Policy Lead – Councillor Mark Irvine                                                  
For further information contact: Iain Jackson, Governance, Risk and Safety
Manager 01546 604188 
APPENDICES 
Appendix 1 – Departmental/Service stats & Late Response Details 
Page 123

Page 124

This page is intentionally left blank

Page 125

Department / Service Total
requests
received
Responded
to in time
Responded
to late
Running
in time
Running
late
Overall % 2022/23 2021/22 2020/21
Chief Executives
CP&D 1 0 1 0 0 0% 0% 100% -
Customer Services
Education 175 156 19 0 0 89% 99% 93% 98%
L&RS 439 404 35 0 0 92% 97% 98% 97%
Commercial 59 59 0 0 0 100% 100% 100% 94%
Development and Infrastructure
Financial 103 103 0 0 0 100% 99% 97% 95%
D&EG 252 228 24 0 0 90% 83% 85% 86%
R&IS 248 220 28 0 0 89% 89% 86% 92%
Customer 103 98 5 0 0 95% 98% 97% 98%
Health and Social Care Partnership
IJB 0 0 0 0 0 - - - 100%
Adult Care 50 49 1 0 0 98% 97% 99% 100%
C&F / CJ 45 43 2 0 0 96% 95% 98% 97%
Live Argyll
Live Argyll 13 12 1 0 0 92% 80% 100% 80%
Totals 1488 1372 116 0 0 92% 94% 93% 94%
FOISA and EIR Requests
Information Requests - Annual Figures - 1st April 2023 - 31st March 2024
Page 125

Page 126

Request
No
Date
Received Date Due Date Closed Duration Subject Late Closure Details
15875 30/05/2023 27/06/2023 03/08/2023 47 Community buyout Late response due to staff absence 
16025 29/06/2023 27/07/2023 28/07/2023 21 Gender Identity Emails
16241 21/08/2023 18/09/2023 19/09/2023 21
Daily Mile in primary and secondary
schools Response sent 1 day late (19.09.23 / 11:06)
16296 31/08/2023 29/09/2023 02/10/2023 21 Seeking Historical School Closure Data Late response from information provider Response sent in full , 1 day late.
16310 04/09/2023 03/10/2023 04/10/2023 21 Pupil attendance figures Staff Resources
Partial response sent 1 day late due to admin
time constraints
16458 03/10/2023 31/10/2023 01/11/2023 21
Use of restraint on pupils and exclusion of
pupils from class
Response sent to Governance Unit within 3
days of due date
Draft media response sent to FOI team late
afternoon on due date. FOI team received at
3.45pm on due date. Consideration of
exemption to be applied had to be considered
due to refusal to release some information.
Response sent 1 day late.
16412 27/09/2023 01/11/2023 02/11/2023 21 Pupil Equity Funding Staff Resources
Clarification requested 03.10.23.  Full response
(nil) sent 1 day late on 02.11.23
16356 15/09/2023 02/11/2023 03/11/2023 21
Children with ASN who are currently out
of formal education
Response sent to Governance Unit within 3
days of due date
Clarification requested and received 04.10.23

Full media response sent to FOI team 01.11.23

Request queried 01.11.23 and revised response
provided to FOI team 03.11.23
16999 24/01/2024 21/02/2024 22/02/2024 21
LGBT Charter Award from LGBT Youth
Scotland - Oban High School Late response from information provider
Partial response sent 21.02.24 over 6 emails (43
attachments).  Final response (copy of 8 emails)
on 22.02.24 after office hours.
17043 02/02/2024 01/03/2024 04/03/2024 21 Wait times for school counselling Staff Resources Response sent in full one day late.
16148 26/07/2023 23/08/2023 25/08/2023 22 Special Educational Needs Schools Late response from information provider Response sent two days' late on 25.08.23
16813 15/12/2023 18/01/2024 22/01/2024 22
Schools closed/mothballed in Argyll and
Bute Staff Resources
Partial response sent two days late on 22.01.24
(after office hours)
17160 26/02/2024 25/03/2024 28/03/2024 23
Incidents of violence, aggression and/or
abuse by pupils Late response from information provider
Contacted requestor on due date to double-
check what data is required for Q3.
16416 28/09/2023 27/10/2023 02/11/2023 24 Exam pass rates by school Staff Resources
Clarification requested on timeframe 28/09. 
Received same day.

Partial response sent late on 02.11.23 due to
workload.
16931 16/01/2024 13/02/2024 19/02/2024 24 Social media footage Late response from information provider Draft media response sent to FOI team 12.02.24
15876 30/05/2023 27/06/2023 04/07/2023 25 Violence and Aggression Reports Service sign-off delay
Will be late due to workload within Data Team. 
Requestor advised 27.06.23 that response will
be sent in July.

Draft response sent to FOI team after office
hours on 03.07.23
16435 28/09/2023 26/10/2023 02/11/2023 25 Racial Incidents in school
Partial response sent 5 days late due to
workload.
17161 26/02/2024 25/03/2024 03/04/2024 25
Incidents of school violence were
recorded in the school year to date
(2023/24). Late response from information provider
16348 13/09/2023 12/10/2023 24/10/2023 28
Minutes from Easdale and Luing PCF/PTA
meetings from the last 5 years Service sign-off delay
(FOI team will redact docs)

Partial response sent 12/10/2023
15649 03/04/2023 04/05/2023 23/05/2023 33 LA Education Budgets
Response sent in full 13 days later than AXLR8
date (2 days later than requestor's preferred
date).
15669 11/04/2023 10/05/2023 11/05/2023 21 RIDDOR Reports Received by LA Late response from information provider
Late response due to Officer
workload/competing demands of service.
15975 15/06/2023 13/07/2023 14/07/2023 21 LGBT policies Late response from information provider
Information not received until due date, info
then had to be clarified and run past press team.
15992 21/06/2023 19/07/2023 20/07/2023 21
Events / meetings that Councilor/ Leader
Currie attended and for duration of
meetings / events and the costs involved
in such meetings Admin Error
Late response due to admin error within FOI
team, original response from creditors was not
passed to Members services to review and
complete response.
16138 24/07/2023 21/08/2023 22/08/2023 21 Alcohol Consumption By-Laws Late response from information provider
Information not supplied to us by legal until
after due date.
16485 09/10/2023 06/11/2023 07/11/2023 21
Details of all council-owned items or
possessions that have been stolen in the
last two financial years Late response due to staff absence 
16826 20/12/2023 23/01/2024 24/01/2024 21 Free school meals expansion Late response from information provider
16835 22/12/2023 25/01/2024 26/01/2024 21
Information regarding operational
decisions, violence in the classroom and
Freedom of Information requests Service sign-off delay
Sent partial response 25/01/2024 awaiting
clarification on Q8
16865 05/01/2024 02/02/2024 05/02/2024 21 Social media advertising spending Service sign-off delay
17027 29/01/2024 26/02/2024 27/02/2024 21
Phase 1 Environmental Site Assessment
desk study Late response from information provider
Partial response, 4 applications of 10(4) (a). Late
response from Environmental Health, response
received 27.02.24
17319 28/03/2024 01/05/2024 02/05/2024 21 Cloud computing and Sustainability Late response from information provider
10 day reminders sent 23.04. 5 day reminders
sent 26.04. Response had to be compiled by
Governance, Risk and Safety Manager due to
the difficulty in receiving responses from
services.
15828 19/05/2023 16/06/2023 21/06/2023 23 Dunivard Road Service sign-off delay
16509 11/10/2023 08/11/2023 13/11/2023 23
Licensing scheme operated by the Local
Authority within the terms of the 1982 Act
or the 2006 Act. Late response from information provider
Partial response sent 08/11/2023. No response
from EH
16742 04/12/2023 05/01/2024 10/01/2024 23
School minibuses/ access to school
buildings Service sign-off delay
16305 01/08/2023 29/08/2023 04/09/2023 24 Deceased Person's Care records
Community Planning & Development
Education
Legal and Regulatory Support
Page 126

Page 127

17207 06/03/2024 05/04/2024 11/04/2024 24 Communications & Public Relations Spend Late response from information provider
This was a complex request that was delayed
initially due to responses coming back from
services and then further delayed as Press team
were consulting with their Head of Service on
response.
17232 11/03/2024 10/04/2024 17/04/2024 25 Property assets
5 reminders sent to legal services for
clarification. 1 reminder sent to finance.
Clarification sought from Commercial Services
received on 10.04.24
16081 10/07/2023 07/08/2023 15/08/2023 26 Acquisition of Land Act 1947 Staff Resources Late response due to staff absences
16593 31/10/2023 28/11/2023 01/12/2023 26 Council's alcohol spend Late response from information provider
Confusion and when response was sent to
central team - spend for external functions was
not supplied. This then had to be collated on
due date resulting in late response
15934 06/06/2023 04/07/2023 13/07/2023 27
A list of all the different complaints the
council has received over the past 12
months Staff Resources
Late due to staff resources within Compliance &
Regulatory Support team and the requirement
for a report to be built to pull the information
from the Complaints system.
15961 13/06/2023 11/07/2023 20/07/2023 27 Total spend on staffing Late response from information provider Late response from HR due to staff resources
16836 22/12/2023 25/01/2024 05/02/2024 27
Translation, Interpretation and language
services costs Late response from information provider
17269 15/03/2024 16/04/2024 26/04/2024 28 Community venues
2 reminders and clarification sought from Live
Argyll. Information received 15.04.24 2
reminders sent to DIS. Information received
16.04.24 and further information required. 2
reminders sent. Information received from DIS
26.04.24
16042 03/07/2023 31/07/2023 11/08/2023 29 Street Traders- Luss Service sign-off delay
Delay in response due to seeking clarity from
Legal Services
16523 16/10/2023 13/11/2023 24/11/2023 29
Care experience for children/young
persons being looked after by ABC Late response due to staff absence Partial response sent 15/11/23
17199 04/03/2024 03/04/2024 19/04/2024 32 Births, Deaths and Marriages Late response from information provider
Partial response sent 02/04/2024. DIS need to
do a manual search of the records for the
information and this is taking time due to staff
resources. 4 reminders sent to DIS performance.
Information provided by service on 19.04.24.
16965 17/01/2024 14/02/2024 04/03/2024 33 Education Service sign-off delay
Partial response (Section 17 applied) sent to FOI
team 04.03.24.  Delay due to late responses
from schools and information requiring to be
double-checked by EMT.
16860 03/01/2024 31/01/2024 23/02/2024 37 Short-Term Let Licensing and Planning Late response from information provider
16618 03/11/2023 05/01/2024 24/01/2024 42
Documents and Communications in
relation to Fiona Woodhouse and
Lochandhu Kennels Service sign-off delay Sent partial response 04/12/2023
16701 21/09/2023 20/10/2023 22/11/2023 43
Staff responsible for publishing Planning
Information
Original request not logged as FOI until due
date
Request originally logged as SAR, however this
part should have been logged as FOI and was
not picked up until SAR response had been
provided
17318 28/03/2024 28/05/2024 07/06/2024 48 Request to do with housing issues Late response from information provider
Late response due to receiving the information
late form the Services and competing work
demands within the services.
16552 18/08/2023 15/09/2023 02/11/2023 53
The boundary of Springbank to the legal
boundary of Lochview Original request not logged as FOI 
17299 09/02/2024 08/03/2024 21/06/2024 92
Information relating to the upkeep of the
lane between Nelson Road and Soroba
Road, Oban Service sign-off delay
Service sign off delay due to issues trying to
identify who owned the land and who maintains
it.
15692 06/04/2023 09/05/2023 10/05/2023 21 Independent Advocacy Late response due to staff absence 
16058 05/07/2023 02/08/2023 03/08/2023 21 FOI Request - Procurement times Staff Resources
16142 24/07/2023 21/08/2023 24/08/2023 23 Homecare Contracts Late response from information provider
16550 24/10/2023 21/11/2023 22/11/2023 21 Private water supply data Late response from information provider
Late response due to competing demands, work
priorities.
16930 16/01/2024 13/02/2024 14/02/2024 21 Veterans and homelessness
17037 30/01/2024 27/02/2024 28/02/2024 21
Ardenslate Road 3' LP - land
contamination Late response from information provider
Re. late response from info provider - it is to be
noted that Admin did not send the request to
the info provider timeously.
17077 07/02/2024 06/03/2024 07/03/2024 21
People registered as homeless or in
temporary accommodation Staff Resources
Late due to Team Lead absence, response could
not be approved.
16128 20/07/2023 17/08/2023 21/08/2023 22 EH Visits to Asylum Seekers Accomodation Late response from information provider Late response from information provider.
16887 09/01/2024 06/02/2024 08/02/2024 22
The total amount spent by the local
authority to house people in temporary
accommodation
16984 19/01/2024 16/02/2024 20/02/2024 22 Private Water Supplies Service sign-off delay
16455 03/10/2023 31/10/2023 06/11/2023 24 Cost of processing STL applications Staff Resources
Late response due to key staff being on leave
and workload pressures.
17083 17/01/2024 14/02/2024 20/02/2024 24 2312-04 - Blairvadach, Argyll & Bute Service sign-off delay
17090 12/02/2024 11/03/2024 15/03/2024 24
Length of time households in temporary
accommodation Admin Error
17301 26/03/2024 25/04/2024 01/05/2024 24
Homelessness applications made by
people with refugee status or
humanitarian protection Staff Resources
Procurement
Development and Economic Growth
Page 127

Page 128

15903 31/05/2023 28/06/2023 05/07/2023 25
How much money has your local authority
collected in fees from issuing short-term
let licenses since October 2022 to May
2023 Service sign-off delay
It was not made known until 27th June that the
request was not being processed, whereupon it
was passed to another information provider for
processing
16180 01/08/2023 29/08/2023 05/09/2023 25 The number of licenced dog breeders Admin Error
Request not forwarded to Information Provider
timeously
16770 06/12/2023 09/01/2024 16/01/2024 25 Disabled Facilities Grants Late response due to staff absence 
17093 13/02/2024 12/03/2024 19/03/2024 25 2108-05 - Auch Lodge, bridge of Orchy Late response from information provider
16157 26/07/2023 23/08/2023 31/08/2023 26
Scottish Companion Animal Welfare
Group (SCAWG) Admin Error Not processed promptly by Admin
16557 25/10/2023 22/11/2023 04/12/2023 28 Local Access Officers and Rangers Late response from information provider
16183 31/07/2023 28/08/2023 11/09/2023 30 KA SNOW3007/00001 Form 2508 Admin Error Request not circulated timeously by Admin
17215 07/03/2024 09/04/2024 22/04/2024 38 Access to Port Mhor, Colonsay 
16782 08/12/2023 08/02/2024 09/02/2024 41
Request under the Environmental
Information (Scotland) Regulations 2004
[BURNESSPAULL-ACTIVE.FID48220587] Late response due to staff absence 
16190 07/08/2023 04/09/2023 09/10/2023 44 Student Accommodation/Social Housing Service sign-off delay
No one took ownership of the cross Service
Request
15717 24/04/2023 23/05/2023 30/06/2023 48
Licensing of Lochandubh kennels from
2018 - present
16181 01/08/2023 29/08/2023 10/10/2023 49 Zoo Licensing Act Late signing off by key Admin
17231 11/03/2024 09/05/2024 03/07/2024 79
Largiemore Holiday Estate Otter Ferry,
Tighnabruaich PA21 2DH.
10 day reminder sent to planning 29.04.24 Some
information received 03.05. Partial response
sent 10.05 Update reminder sent 24.05 to
Planning
16089 11/07/2023 08/08/2023 09/08/2023 21 Pedestrian Crossing Faults
16258 23/08/2023 20/09/2023 21/09/2023 21 Utilities Work Schedule -Grass Cutting Rhu Late response from information provider
Late response due to absence within Amenity
Services team.
16590 26/10/2023 23/11/2023 24/11/2023 21 Oban Flood Protection
16560 27/10/2023 24/11/2023 27/11/2023 21 Water Damage Late response due to annual leave.
16810 15/12/2023 18/01/2024 19/01/2024 21 SEND home to school transport Late response from information provider
The draft response for review by the
communications team was received from the
service on the due date. Further clarification
was required before review, therefore the
response was was delayed.
16838 22/12/2023 25/01/2024 26/01/2024 21 Parking charges Service sign-off delay Delay in sign off from the press team
17277 19/03/2024 18/04/2024 19/04/2024 21 Potholes
17292 22/03/2024 23/04/2024 24/04/2024 21
Waste Management and Recycling
Spending Staff Resources
Late response due to staffing issues within DIS
Performance HQ team.
16200 31/07/2023 28/08/2023 30/08/2023 22
Oil spill of 19th (may not be exact day)
May 2022, on A846 Road heading North to
Bowmore 300m south of Balliemartin Turn
Off Late response from information provider
Late response due to resource issues within
Roads Ops team.
16286 28/08/2023 26/09/2023 28/09/2023 22
List of Public Bus routes closed within the
past 10 years Late response due to staff absence holding e-mail sent 26/09/23
16319 05/09/2023 04/10/2023 06/10/2023 22
Cleaning intervals of drains at the ends of
my street namely West Douglas Drive
Helensburgh
16364 18/09/2023 17/10/2023 19/10/2023 22 Play parks Late response from information provider
16798 13/12/2023 16/01/2024 18/01/2024 22 Bin collection complaints Late response from information provider
Original response was queried by FOI team,
therefore the response was delayed by further
response from the service.
16863 05/01/2024 02/02/2024 06/02/2024 22 Flood Risk History Request Late response from information provider
Late response due to confusion over co-
ordinates provided by requester.
17178 29/02/2024 28/03/2024 03/04/2024 22 Tarmac Late response from information provider
Late response as we attempted several
approaches to try and gather the information.
Ultimately this was unsuccessful.
17288 21/03/2024 22/04/2024 24/04/2024 22 Littering Staff Resources
Late response due to staffing issues within DIS
Performance HQ team.
16912 11/01/2024 08/02/2024 13/02/2024 23 Flood funding over the last decade Late response from information provider
17306 28/03/2024 29/04/2024 02/05/2024 23 Waste sent for incineration Staff Resources
Late response due to staffing issues within DIS
performance HQ team
16839 22/12/2023 25/01/2024 31/01/2024 24
Ref: Street Light Fault outside 23 Queen
Street, Helensburgh: 231007-000044 (
First reported around 7th October 2023 ) Late response from information provider
Late response due to absence within
streetlighting team.
17249 13/03/2024 12/04/2024 18/04/2024 24 Illegal dumping of rubbish Late response from information provider
Late response due to absence of key staff
member
16357 15/09/2023 16/10/2023 24/10/2023 26 Parking Infrastructure
Late response due to resource issues within
Parking Services team
17226 08/03/2024 09/04/2024 17/04/2024 26 Crematoria Late response from information provider
late response due to resource issues within
Amenity Services team.
17267 15/03/2024 16/04/2024 24/04/2024 26 Drains Staff Resources
Late response due to staffing issues within DIS
Performance HQ team.
17295 22/03/2024 23/04/2024 02/05/2024 27 Electric vehicle chargers Staff Resources
Late response due to staffing issues within DIS
performance HQ team
17010 25/01/2024 22/02/2024 05/03/2024 28 Pingo DRT service Late response from information provider
Late response due to resource issues within the
Public Transport team.
16781 08/12/2023 11/01/2024 24/01/2024 29
Consultation into the preferred option for
'Kilcreggan harbour' Late response from information provider
17214 07/03/2024 08/04/2024 22/04/2024 30
Reference 10656370, regarding the
culvert and burn within close proximity of
Cardross Road in Helensburgh Late response from information provider
Reason for late response - technical difficulties
in finding a way to send 252mb of data to
requester.
16003 28/06/2023 26/07/2023 21/09/2023 61 Fixed penalty notices Late response from information provider
Software issues prevented us from running the
reports needed to respond to this FOI. The
requester was kept informed.
Roads & Infrastructure
ICT
Page 128

Page 129

16243 21/08/2023 18/09/2023 19/09/2023 21 Finance, HR and Payroll Systems Late response from information provider
16167 28/07/2023 25/08/2023 31/08/2023 24 Hosting Contract Late response due to staff absence 
16449 02/10/2023 30/10/2023 03/11/2023 24 Alcatel-Lucent Enterprise Late response due to staff absence 
15670 11/04/2023 10/05/2023 18/05/2023 26 Hosting Contract Late response due to staff absence 
15794 11/05/2023 08/06/2023 16/06/2023 26 ICT Information Late response due to staff absence 
16842 27/12/2023 26/01/2024 07/02/2024 28 Care home mortality data Late response from information provider Late response from information provider
16484 09/10/2023 06/11/2023 07/11/2023 21 Foster care retention statistics Service sign-off delay
16777 06/12/2023 09/01/2024 11/01/2024 22
Joint Statement from Cornerstone and
A&B HSCP Late response due to staff absence
Partial response sent to requestor 8/1/24 for
meeting. Final response issued 11/1/24 after
staff with the information returned from leave.
Some questions refused under section 17.
17117 19/02/2024 18/03/2024 09/04/2024 51 Libraries
Children, Families & Justice
Live Argyll
Adult Care
Page 129

Page 130

This page is intentionally left blank

Page 131

ARGYLL AND BUTE COUNCIL  AUDIT & SCRUTINY COMMITTEE   
FINANCIAL SERVICES  5 SEPTEMBER 2024  
AUDIT AND SCRUTINY COMMITTEE ANNUAL REPORT 2023/24 
1. SUMMARY 
1.1 The purpose of this report is to provide the Chair of the Audit and Scrutiny
Committee’s (the Committee) annual overview of the Committee’s activity
during the financial year 2023/24 and a summary of key developments
since the commencement of 2024/25.  It sets out how the Committee has
fulfilled its remit and provides assurances to the Council. 
2. RECOMMENDATIONS 
2.1 Review and endorse the Chair’s Annual Report. 
2.2 Agree that the Chair presents the report to a future meeting of the Council at
a date to be confirmed. 
3. DETAILS 
3.1 It is important that the Committee fully complies with best practice guidance  
on Audit Committees to ensure it can demonstrate its effectiveness as a
scrutiny body as a foundation for sound corporate governance for the
Council. The Chartered Institute of Public Finance and Accountancy
(CIPFA) issued an updated guidance note Audit Committees Practical
Guidance for Local Authorities and Police 2022 Edition which incorporates
CIPFA’s Position Statement: Audit Committees in Local Authorities and
Police. This sets out CIPFA’s view of the role and functions of an Audit
Committee. The CIPFA Audit Committees Guidance includes the
production of an annual report on the performance of the Audit Committee
against its remit for submission to the Council. 
4.  CONCLUSION 
4.1 The Audit and Scrutiny Committee Annual Report 2023/24, which is
appended to this report as Appendix 1, provides assurance to full Council
over the activity of the Committee. 
5.  IMPLICATIONS    
5.1 Policy: None  
5.2 Financial: None  
5.3 Legal: None 
5.4 HR: None 
5.5 Fairer Scotland Duty: None 
5.5.1 Equalities: protected
characteristics:
None 
5.5.2 Socio-Economic Duty: None
Page 131 Agenda Item 10

Page 132

5.5.3 Islands Duty: None 
5.6
5.7
Climate Change:
Risk:
None
None 
5.8
5.9
Customer Service:
The Rights of the Child
(NCRC)
None
None    
For further information please contact Internal Audit (01546 604108) 
Paul Macaskill
Chief Internal Auditor
5 September 2024 
Appendices: 
1. Audit and Scrutiny Committee Chair Annual Report 2023/24
Page 132

Page 133

1 
Appendix 1 - Audit and Scrutiny Committee Chair Annual Report 2023/24 
Introduction by the Chair of Audit and Scrutiny Committee 
This report provides an overview of the Audit and Scrutiny Committee’s (the Committee)
activity during the financial year 2023/24 and a summary of key developments since the
commencement of 2024/25. 
In 2023/24 the Committee met quarterly on a hybrid approach with the following as
appointed members: 
Martin Caldwell (Chair) Daniel Hampsey Reeni Kennedy-Boyle 
Graham Hardie Andrew Vennard
Jim Lynch (Vice Chair) Dougie McFadzean 
Committee meetings were also attended by appropriate representatives of the Council
including the Chief Internal Auditor (CIA) and our appointed External Auditors, Mazars.
Other Council Officers attend as and when appropriate including the Chief Executive
and the Head of Customer Support Services who attends regularly to advise the
Committee on issues relating to performance management. 
Concerns have been expressed about the service experienced by the Council from
Mazars, as part of their External Audit appointment, and these have been escalated in
order that lessons can be learned for future audit years. It is understood that some of
the reasons associated with the service provided to the Council included difficulties in
recruiting professional audit staff due to sector shortages, and delays in new staff
starting when appointed. Whilst these issues have caused significant inconvenience to
officers, particularly within Finance, it is important that appropriate service standards are
achieved going forward in order to prevent a repeat of such experiences in 2024/25. 
In early April of 2024, the Council voted for a change of leadership and subsequently
appointed a new Leader and Provost. This also has resulted in previous Committee
membership established by the Council to be reset and new appointments to
Committees of the Council, including that to the Audit and Scrutiny Committee. This has
resulted in only two changes in membership and both individuals received formal
training in their respective roles on the Committee. 
The Council’s Internal Audit section is subject to an independent External Quality
Assurance Assessment which is mandatory under the Public Sector Internal Audit
standards (PSIAS) every five years. I was pleased to note that the service was deemed
compliant in all 14 areas of assessment. This assessment is augmented with annual
reviews which are reported to the Committee, and I am again reassured that full
compliance has been maintained in 2023/24. It is important that the service provided by
Internal Audit maintains the highest standards which helps the Committee in receiving
high quality reports for its assurance purposes. Furthermore, this supports the wider
governance operating within the Council. I continued to work closely with the CIA and
have built up a good and productive relationship which I have no doubt will continue
under the Committee’s new Chair. 
In looking forward to 2024/25 and beyond, significant pressures continue as a result of
financial settlements and this has been particularly compounded as a result of
Page 133

Page 134

2 
inflationary pressures, together with the risk of unfunded or partly funded pay
settlements and the lack of opportunities to focus funding received to areas where
resources may be best used due to ring fencing of specific allocated resources which
continues to present a complex backdrop within local government. These pressures are
likely to remain and will continue to add an element of uncertainty in relation to the
overall financial picture affecting the Council. The Council continues to undertake
appropriate medium to long term financial planning using a scenario modelling approach
which helps to provide Members with a thorough overview of the implications of funding
and cost pressures. I am however satisfied that the Council continues to embrace these
challenges in a strategic, capable, and productive manner. 
Janice Wason Hall – Chairperson 
Martin Caldwell – Former Chairperson
Page 134

Page 135

3 
1. Audit and Scrutiny Committee’s Effectiveness and Impact
1.1 The Committee’s role is to ensure that the Council’s internal control
framework and governance arrangements are operating effectively.  In order
to fulfil this role a range of reports are provided to the Committee during the
year.  I am satisfied that the frequency, content and detail of reports provided
to the Committee, allow myself and fellow members to adequately fulfil this
role.
1.2 In March 2023 Internal Audit presented their annual audit plan, setting out
their approach to the 2023/24 audit of the Council and in June 2023 Mazars
outlined their planned approach to their work reflecting their statutory duties
and risk-based approach. The respective audit plan and approach were
considered by the Committee and accepted. 
1.3 During 2023/24 the CIA has continued to develop our approach to audit and
scrutiny.  Particular developments which have furthered the effectiveness of
both Internal Audit and the Committee are:
• The continued and successful work of the Counter Fraud Team.
• The approach to Scrutiny continues to develop and work to complete the
‘Fly Tipping’ review in 2023/24 was concluded.
• The CIA engaged with Members of the Committee as part of the planning
process for the 2023/24 audit plan.
• An external assessment has been undertaken during 2022/23 in terms of
compliance with the Public Sector Internal Audit Standards (PSIAS) after a
portfolio of evidence has been prepared and submitted. This independent
assessment identified that the Internal Audit service was in full compliance
with all 14 areas of criteria. This was supplemented by the annual self-
review in 2023/24 which confirmed that standards have been maintained to
these levels. 
2. Assurances 
Internal Audit Assurance
2.1 Internal Audit is a key source of assurance for both Members and
management on the effectiveness of the control environment. The Committee
has a responsibility for ensuring that Internal Audit is effective in the provision
of this assurance.  I am content that the minor amendments made to the
2023/24 audit plan as a result of unavailability of staff and unscheduled work
within the Council will be further risk assessed and considered as part of the
future audit planning process. I am content with the assurance provided by
the CIA that sufficient work has been undertaken to allow him to provide an
opinion on the Council’s systems of governance and internal control.
Throughout the year, in my opinion, clear assurance judgements are
provided, underpinned by an appropriate evidence base and, where
appropriate, include sound management advice and guidance. 
2.2 The Committee has received regular reports and information from the CIA
including:
• risk based internal audit annual plan
• regular progress reports
• annual report, in line with PSIAS, which provided the CIA’s independent
annual opinion on the effectiveness of the Council’s risk management,
Page 135

Page 136

4 
internal control and governance processes. 
2.3 Exhibit 1 shows an analysis of assurance opinions provided by internal audit
in the three-year period 2020/21 – 2023/24. Whilst there have been minor
fluctuations year to year, the important trend identified is a fall in audits issued
that have been providing limited assurance. In addition, there has been an
increase in the number of audits classified as providing a substantial level of
assurance in 2023/24, there were none classified as being limited.  For these,
and all other audit reports, management have accepted 100% of audit
recommendations and action plans have been agreed with a robust follow-up
system in place with progress presented to the SMT on a quarterly basis and
to the Committee as a standard agenda item.
Exhibit 1 – Audit Assurances (2021/22-2023/24) 
2.4 The Committee has a clear role in relation to oversight of the internal audit
function; specifically in relation to overseeing its independence, objectivity,
performance and professionalism.  I am pleased to advise, as Chair of the
Committee, that I am satisfied that Internal Audit is effective and activity is
undertaken in accordance with relevant standards. 
External Audit Assurance
2.5 External Audit is an essential part of the process of accountability and
assurance for public funds, providing an independent opinion on the financial
statements, and reviewing aspects of governance and financial management.
Working closely with Internal Audit, the external audit programme ensures
that statutory responsibilities are delivered, without the duplication of audit
work. The Council’s appointed external auditors are Mazars.
2.6 The audit of the Council’s financial statements has been substantially
concluded and an ‘unqualified’ opinion has been provided. Consequently, this
should be a basis of assurance which the Committee can take as part of its
duty as those charged with governance. Whilst at the time of writing this
report the 2022/23 Trust Funds were still not signed off which is
disappointing, we expect these to be presented by Mazars to the Committee
in due course. 
7
6
3
2
0
8
7
4
1
0
5
8
4
0 0
0
1
2
3
4
5
6
7
8
9
High Substantial Reasonable Limited No Assurance
2021/22 2022/23 2023/24
Page 136

Page 137

5 
2.7 The Council was subject to a Best Value review in 2019/20 which highlighted
that good progress was made by the Council since the last inspection in
2015, specifically the significantly improved relationships amongst elected
members and between members and officers and the Council’s sound
approach to financial planning. All of these points and actions have now been
addressed and a final report was prepared and presented to the Audit and
Scrutiny Committee in March 2023. This should provide further assurance
that these key issues have been addressed by the Council. Further
development in performance and reporting has been introduced and a
seminar for the Committee has been arranged in order that the latest position
has been conveyed to the Committee which has oversight. 
3. Risk Management 
3.1 The CIA performs an annual strategic risk register assurance mapping
exercise which enables the Committee to assess the levels of assurance it
can take over the activity undertaken by the Council to manage its strategic
risks. This is complemented by the Chief Executive presenting the Strategic
Risk Register to the Committee on an annual basis, to allow the Committee to
further scrutinise the approaches being taken to manage risk. 
3.2 In 2023/24 a review of Risk Management was undertaken and this provided
an audit opinion that a high level of assurance can be taken. This is the
highest level of audit opinion and should further provide additional assurance
on the Risk Management arrangements within the Council. 
4. Independence 
4.1 To assist in preserving the Committee’s independence, measures are in place
including:
• the appointment of an independent chair 
• observation of the Internal Audit Charter which specifies the independence
of the CIA and the wider audit team 
• the non-political approach of the committee
• the active involvement of the external auditors
• clear terms of reference aligned to CIPFA’s Role of the Audit Committee
Guidance 
5. Scrutiny 
5.1 During 2023/24 the Committee undertook work on completing the Fly-Tipping
scrutiny review as part of our scrutiny plan. This report was presented to the
Audit and Scrutiny Committee in March 2024. These and previous reports
were well received by the Committee and widened the understanding of the
complexities and challenges faced by both staff and the community in specific
areas and where these reports will help allow continuous improvement as a
Council.
5.2 The benefits of scrutiny are twofold; helping to understand, what can often be
multifaceted and procedurally complex issues due to legislation but also to
help consider ways to improve and develop to make any processes more
understandable and/or streamlined where that is at all possible.  
5.3 Scrutiny work will continue in 2024/25, it is anticipated that work will focus on
the Councils Complaints processes. This review will commence in late
Page 137

Page 138

6 
autumn of 2024, allowing the new Committee to settle into its role and build
up experience in this area of undertaking scrutiny reviews. Going forward
Members may wish to start considering potential areas for scrutiny for
2025/26, it is anticipated that potential areas will be collated towards the end
of autumn as part of this process. 
6. Counter Fraud Team (CFT) 
6.1 The Council has an effective CFT having been made permanent after a trial
period with both officers having completed the CIPFA (Chartered Institute of
Public Finance and Accountancy) Accredited Counter Fraud Specialist
Course meaning they are fully accredited counter fraud investigators.  This
further strengthens the Council’s commitment to protecting the public purse. 
6.2 Since the inception of the CFT, regular reporting to the Audit and Scrutiny
Committee takes place, and latterly in June 2024, the CFT reported that
proactive and targeted work in this area has resulted in a cumulated £1.12M
(ending April 2024) being rebilled and that to date £797K (ending April 2024)
has been recovered. The ongoing work of the CFT in both recovery and also
in its deterrent effect, sends a strong message that the Council will take all
reasonable steps it can to identify error and fraud and also take appropriate
action to recover monies that are due. Regular reports are presented to the
Committee each quarter in relation to the work of both Internal Audit and the
Counter Fraud function. 
6.3 Local visits throughout Argyll and Bute were undertaken in the year and this
will form part of a rolling programme of visits going forward, focusing on
maximising the income due to the Council. In addition, the CFT are raising
awareness of the Council’s zero tolerance to fraud and this will help act as a
deterrent to fraud being perpetrated in the first place. I expect further visits to
be equally successful and so far in 2024/25 this has proved to be the case. It
is pleasing to note that the ongoing work in relation to counter fraud clearly
demonstrates the Council both in its commitment to recovering sums of
revenue due through error or fraud but also in the wider context of good
governance. 
7. External Quality Assurance Assessment – Internal Audit
7.1 The mandatory Public Sector Internal Audit Standards (PSIAS), published in 
April 2013 and updated in March 2017, apply to all internal audit service 
providers in the UK public sector. To supplement the PSIAS, and provide 
specific guidance surrounding its application within a local government 
setting, the Chartered Institute of Public Finance and Accountancy (CIPFA) 
compiled a Local Government Application Note, (LGAN) which was updated 
in 2019. This requires all internal audit providers to have an independent
external assessment of these standards in application within their service
provision. New Global Standards have been developed which come into
effect in 2025 and on the publication of the updated PSIAS, a gap analysis
will be undertaken to identify any necessary changes that may be required to
be implemented. 
7.2 An independent report on the Council’s Internal Audit Service was prepared
and presented to the Audit and Scrutiny Committee in March 2023. It is
pleasing and reassuring to note that the assessor found that in all 14 areas of
Page 138

Page 139

7 
assessment the Council’s Internal Audit Service fully conforms to the
standards.  The assessor also identified that the team are highly qualified with
a training plan in place to address any skills gaps and that they deliver a high-
quality service for the Council which is evident by the questionnaires returned
after the completion of each review. 
7.3 This was the first time the Council’s Internal Audit Service obtained a fully
conforms opinion in all 14 areas of assessment. The independent report
demonstrates the importance of having a fully resourced and functioning
service which provides assurance to senior management and to those
charged with governance responsibilities, specifically, the Audit and Scrutiny
Committee. This position should provide substantial assurance to the Council
and Members of the Audit and Scrutiny Committee. Annual internal
assessments will continue until the next scheduled external assessment in
2028. 
8. Looking Forward 
8.1 I intimated my intention to stand down as Chair after having held this
independent position for over a decade and continued to provide cover until a
suitable replacement was found. I was pleased to note that the Council has
subsequently identified a new independent Chair to lead the Committee,
Janice Wason-Hall, who will take over the role commencing financial year
2024/25 and I wish her every success and enjoyment as I have had in the
role.  I will be pleased to support that transition and assist the new Chair to
settle into her new role. It has also been a pleasure to have worked with our
Vice Chair, Councillor Jim Lynch and acknowledge the support he has
provided to me in this role. I now wish Jim Lynch every success as he leaves
the Committee and takes up the role of Leader of the Council.
8.2 In 2024/25 and onwards the Committee will consider potential options/topics
for scrutiny reviews and as a Committee we will continue to implement and
further develop our scrutiny approach.  
8.3 This focus on continuous improvement is equally applicable to the audit
element of the Committee and we will continue to work with the CIA and,
where appropriate, our newly appointed External Auditors Mazars, to identify
opportunities to further develop the skillset and expertise of both the
Committee and the internal audit department to facilitate effective challenge
and scrutiny. 
8.4 The Counter Fraud Team will continue to focus their resources on specific
concerns across the local authority area seeking to recover monies owed and
due to the Council in accordance with its policies.
8.5 The Council continue to provide the audit services to the HSCP and were
awarded the contract for a period of three years commencing 1 April 2024.  A
formal service level agreement is in place to reflect the new contract. In
2023/24, a plan of audit coverage was agreed and presented to their Audit
and Risk Committee.
8.6 The Internal Audit team are focused, professional and work continues to
promote better resilience within the team through the opportunities of
professional training schemes and other forms of staff development. This
approach fits in well with the Council’s programme of ‘Growing our Own’ in
Page 139

Page 140

8 
order that the Council has skilled workforce for the future and these are
retained locally where possible. 
8.7 We will continue to provide updates on progress of the CFT and reports will
be presented to the Committee as part of the quarterly and annual reporting
of the Internal Audit service. 
9. Conclusion 
9.1 Based on the reports received and reviewed by the Committee, I am in
agreement with the CIA’s annual audit report which confirms that reasonable
assurance can be placed upon the adequacy and effectiveness of the
Council’s internal control system in 2023/24. I am satisfied that active
monitoring and follow up of recommendations are in place in respect of
agreed management actions. This follow up process is further enhanced by
the continuous monitoring programme carried out by internal audit which
provides ongoing assurance over the Council’s core transactional based
systems. 
9.2 The pressures on the Council continue both in the need to balance delivering
the services required by our communities but also in the backdrop of
challenging financial settlements, economic and socio-demographic changes
which are likely to remain for the foreseeable future. The need for a continued
strong, independent, resourced and resilient Internal Audit team has never
been so important and will be critical going forward in helping the Council to
meet these challenges and provide the assurances that are required by the
Audit and Scrutiny Committee, senior management and the Council.
Page 140

Page 141

ARGYLL AND BUTE COUNCIL  AUDIT AND SCRUTINY COMMITTEE 
FINANCIAL SERVICES  5 SEPTEMBER 2024 
STRATEGIC RISK ASSURANCE MAPPING 
1. EXECUTIVE SUMMARY 
1.1 The purpose of this report is to set out Internal Audit's assessment of the sources
of assurance for the Audit and Scrutiny Committee (the Committee) on the
management of the Council's strategic risks. 
1.2 Appendix 1 highlights the overall assessment against each of the strategic risks.
It should be noted that the assessment is based on the level of assurance that the
Committee can rely on. A 'red' assessment therefore highlights where there are
gaps in evidence of active/targeted actions/activity rather than an assessment on
the management of that risk. 
2. RECOMMENDATIONS 
2.1 To note the risk assurance map at appendix 1. 
3.  DETAIL   
3.1 Internal audit has a key role in relation to the Council’s governance to provide
assurance over the effective management of risk. 
3.2 The Chief Executive presents the Strategic Risk Register to the Committee on an
annual basis which provides the Committee the opportunity to scrutinise the
register and seek assurance from the Chief Executive that risks are being managed
appropriately.  
3.3 The CIA is of the view that the cumulative effect of these management
arrangements both contribute to positive risk management reporting within Argyll
and Bute Council while also maintaining an annual review to provide appropriate
overview and update of key emerging issues, which will be reported to the
Committee. 
3.4 The Public Sector Internal Audit Standards (PSIAS) require that Internal Audit
evaluate the effectiveness of the Council’s risk management process. However, it
does not state this needs to be an annual exercise. Furthermore it states that
Internal Audit may gather the information to support an assessment of the
effectiveness of risk management processes ‘during multiple engagements ‘and
further states that ‘The results of these engagements, when viewed together,
provide an understanding of the organisation’s risk management processes and
their effectiveness‘.  As such PSIAS does not require a full risk management audit
on an annual basis.  Additionally, The CIPFA publication “Audit
Committees: Practical Guidance for Local Authorities and Police” (2022 Edition)
requires the Audit Committee to have the option to consider risk management on a
regular basis, regardless of who has operational responsibility for it.  That option is
always available. 
Page 141 Agenda Item 11

Page 142

3.5 Appendix 1 provides a summary of the Council’s strategic risk assurance map
which is based on the ‘three lines model’ (formerly known as the Three Lines of
Defence). 
1. The first line is the ‘functions that own and manage risks’. It is the control
environment established by day to day business operations and risk
management processes. It is formed by managers and staff who are
responsible for identifying and managing risk as part of their accountability
for achieving objectives. This requires an understanding of the Council, its
objectives, the environment in which it operates, and the risks it faces. It
includes things such as: 
• identifying risks and improvement actions
• implementing controls
• reporting on progress 
2. The second line is the ‘functions that oversee or who specialise in
compliance or the management of risk’. This provides the policies,
frameworks, tools, techniques and support to enable risk and compliance to
be managed in the first line, conducts monitoring to judge how effectively
they are doing it, and helps ensure consistency of definitions and
measurement of risk. The Council’s various committees and Strategic
Management Team are key functions in delivering this element. 
3. The third line of defence is the ‘functions that provide independent
assurance’. This is provided by internal audit. 
4. Other scrutiny is provided by external regulatory bodies which will include
External audit who offer independent challenge and provide an evaluation,
through a risk-based approach, on the effectiveness of the Council’s
governance, risk management, and internal control. 
Page 142

Page 143

3.6 The table below summarises the assessment against each Strategic Risk.
Strategic Risk Risk Score
(August 2024)
Assurance
Assessment
1. Population, external infrastructure
and economic decline
Red 16 Green
2. Condition and suitability of
infrastructure and asset base
Amber 12 Green
3. Financial sustainability Amber 12 Green
4. Governance & leadership Amber 8 Green
5. Engagement and understanding the
needs of the community
Amber 9 Green
6. Service delivery Amber 12 Green
7. Health & Social Care Partnership Amber 12 Green
8. Civil contingency and business
continuity arrangements are not
effective
Green 6 Amber
9. Waste management Red 16 Amber
10. Service delivery – Cyber Security Red 15 Amber
11. Cost of living crisis Amber 12 Amber
12. Impact of climate change Amber 12 Green
13. Lack of housing availability Red 20 Amber 
3.7  The assurance map has not identified an area where there may be a concerning
mismatch between the level of risk identified and the assurance provided to
Committee. 
3.8 
3.9 
3.10 
Waste Management has been subject to regular monitoring and update from the
service to the Council’s Audit and Scrutiny Committee, with the latest update in
December 2023. Additional funding is to be provided from the Scottish
Government of £1.5M to support the compliance with the BMW ban. In addition,
regular reports are being submitted to and are being monitored by the relevant
service Committee of the Council. 
In relation to ‘Service Delivery – Cyber Security’; work has been undertaken in
this area as part of the 2022/23 plan which provided a substantial level of
assurance. Going forward two planned reviews will be undertaken as part of the
2024/25 Internal audit plan putting additional audit resources into this area of
risk, specifically, Data Security and Information Security as well as the IT Risk
Register and Mitigation Processes. However, it is relevant to note that work
undertaken in 2022/23 and 2023/24 identified no significant concerns in relation
to Cyber Security or Cloud Computing. Whilst this is in part reassuring, there is
always a heightened risk to public bodies in relation to this critical area of
business activity. 
The Council declared a Housing Emergency due to the risks associated with the
Council, partner agencies and communities being unable to attract and retain
working age people due to lack of housing and pricing. A housing summit in
collaboration with housing delivery partners was held in December 2023 in order
to forge commitments aimed at tackling housing shortage which maximise
resources, pursue innovation, coordinate planning and target delivery. Plans are
underway to approach this complex and difficult issue at both a national and local
level. 
Page 143

Page 144

3.11 The remaining areas, where assurance has been assessed as “amber”, either
have audit reviews already undertaken, scheduled or included as part of the
ongoing audit planning process. All changes to the Strategic Risk Register from
September 2024 will be assessed in the 2025 Assurance Mapping Exercise. 
4. CONCLUSION
4.1 This exercise has again confirmed that for the majority of risks in the Council’s
strategic risk register there are either sufficient assurances in place or internal
audit have scheduled work to fill identified gaps. Nevertheless, it is important to
outline that such mitigations and assurances do not alone guarantee that an
adverse event or risk will not present itself or materialise. 
5. IMPLICATIONS 
5.1 Policy – None 
5.2 Financial – None 
5.3 Legal – None 
5.4 HR – None
5.5 Fairer Scotland Duty – None 
5.5.1 Equalities – protected characteristics – None
5.5.2 Socio-economic Duty – None
5.5.3 Islands – None
5.6 Climate Change – None 
5.7 Risk – The assurance mapping exercise has provided a satisfactory level of
assurance that the Council is managing and monitoring its strategic risks
effectively
5.8 Customer Service – None
5.9 The Rights of the Child (UNCRC) – None 
Paul Macaskill
Chief Internal Auditor
5 September 2024 
For further information contact: 
Paul Macaskill, Chief Internal Auditor, 01436 604108 
APPENDICES
Appendix 1 – Strategic Risk Assurance Map
Page 144

Page 145

APPENDIX 1: Strategic Risk Assurance Map 
N
o
Risk Risk
Score 
First Line of Defence  Second Line of
Defence
Third Line of Defence  Assessment
1 Population,
External
Infrastructure
and Economic
Decline 
Failure to identify
relevant factors
contributing to the
decline and
failure to develop
strategies and
actions targeting
these factors.
Red
16
• Service planning linked
to Corporate Outcomes
and the A&B Outcome
Improvement Plan
(ABOIP)
• Community and multi-
agency links through
Community Planning
Partnership
• Parliamentary forum
• Argyll, Lomond and
Islands Rural
Regeneration Initiative
• Argyll and the Isles
Strategic Tourism
Partnership
• Promotion and
marketing of Argyll &
Bute (ABplace2B
campaign)
• Business Gateway
Service focused on
helping local
businesses grow
• Council Leader
engaging with leaders
of other west coast
councils suffering
population decline 
• Economic
Strategy and
Action Plan
monitored by
ED&I Committee
• CPP report on the
progress being
made against the
outcomes and
vision of the
ABOIP and issue
annual reports.
• Monitoring of CPP
plan and
performance at
CPP Management
Committee.
• Area Community
Action Plans
progress reported
to Community
Planning Groups
• ABOIP targets
population and
economic
recovery
• Performance
reports
considered by
A&SC, strategic
committees and
area committees 
External Audit
• Best Value Assurance
Report (May 2020)
highlights Council’s and
CPP partners commitment
to a shared vision and that
they recognise the
challenges including the
declining and aging
population 
Internal Audit
• Planning 
(2023/24 – (Substantial) 
Scrutiny
• Economic Strategy
(2019/20) 
Future
• Rural Growth Deal
Outline Business Cases
and Final Business Cases
being worked on and
signing of Full Deal
Agreement is expected in
September 2024
• UK Shared Prosperity
Funding Investment Plan
is being actioned as per
plan.  
• Multi-agency approach to
refugee settlement
underway linking with
national processes and
agendas..
• The council will continue
as a partner of the
There is a range
of assurance
sources across
the three lines of
defence.
Page 145

Page 146

Highlands and Islands
Regional Economic
Partnership and lobby for
Government investment
to realise economic
opportunity and address
barriers to future
sustainable growth. 
• Internal Audit 
Community Education
(2024/25)
• Short Term Lets (2024/25) 
2 Condition and
suitability of
Infrastructure &
Asset Base 
Infrastructure and
asset base does not
meet current and
future requirements
and is not being used
or managed
efficiently and
effectively.
Amber
12
• R&A Control Hub and
Joint Operations Team
• Operational risks
monitored quarterly
• Strategic Asset Mgt
Board
• Corporate Asset
Management Strategy
and Corporate Asset
Management Plan
• Service Asset
Management Plans
• Community
Empowerment and
Community Asset
transfer
arrangements in
place
• Roads Asset
Management Plan
• One Council
Property Approach
• Routine inspections
of roads
infrastructure to
deal with potential
weak areas
• Revised capital
management
procedures 
Future
• D&I  performance
reporting to ED&I
Committee
• Asset Mgt Plans 
reviewed annually
by Council as part
of the budget
setting process
• Status and
Options reports to
ED&I Committee
Internal Audit
• Community Empowerment
Act (2018/19 - High)
• Capital Monitoring
(2020/21 - Substantial)
• Management of Property
Contracts (2020/21 -
Reasonable)
• Land & Asset Disposal
(2021/22 - Substantial)
• Internal Audit – Fixed Asset
Register  (2021/22) –
Reasonable)
• Piers and Harbours
(2023/24 – Reasonable) 
Scrutiny
• Roads Maintenance
(2018/19)
• Scrutiny – Community Asset
Transfers (2021/22) 
Future
• Leasing - Estates
(2024/25)
• Asbestos Management
(2024/25
• Roads and Flood
Prevention (2024/25)
There is a range
of assurance
sources across
the three lines of
defence. Page 146

Page 147

• Modern Workspace
Programme to review,
and rationalise property
portfolio for future needs
of the Council.  Changes
on phased and town by
town basis. Programme
will be running for 3
years - April 2024
• Bridges Asset
Management Plan and
Inspection Regime
(2024/25) 
3 Financial
Sustainability 
Insufficient resource
to meet current and
future service
requirement. 
Budget not aligned /
does not support
business outcomes.
Amber
12
• Budget preparation and
monitoring
• Medium term financial
strategy with worst case,
mid case and best case
scenario planning
• Treasury Mgt Policy
• 5 year budget outlook 
updated quarterly
• Financial Services 
Team aligned to service
delivery
• Regular engagement
between budget holders
and appointed finance
contact
• Reserve balances
monitored throughout
year 
• Financial
monitoring and
financial risk
monitoring to
P&R/BCC
Committee
• Budget and
budget working
papers
considered by
full Council
• Financial Strategy
reported to P&R
Committee
• 5 year budget
outlook to P&R
Committee
• Treasury Mgt
Annual Report to
P&R Committee
and A&SC
• Joint SMT/Policy
Leads meetings
include
discussions
around financial
issues
Internal Audit
• Continuous Monitoring
• Financial Planning
(2018/19 - Substantial)
• Capital Monitoring
(2020/21 - Substantial)
• Internal Audit – Fixed Asset
Register  (2021/22) –
Reasonable)
• Internal Audit –
Management of Debt and
Recovery  (2022/23) –
Reasonable
• Internal Audit – Financial
Ledger  (2023/24-
Substantial) 
External Audit
• Assessment of financial
mgt via annual audit
• Best Value Assurance
Report (May 2020)
highlights Council has
good financial planning
arrangements in place but
could take steps to
enhance its long-term
strategy. (Strategy revise
in 2021)
• Assessment of budget
There is a range
of assurance
sources across
the three lines of
defence.
Page 147

Page 148

monitoring arrangements 
Future
• Internal Audit – NDR 
(2024/25)
• Rural Growth Deal Outline
Business Cases and Final
Business Cases being
worked on and signing of
Full Deal Agreement is
expected September
2024.
• Consider the implications
and opportunities from the
Visitor Levy (Scotland) Bill
which could generate
additional income from
2026/27. 
4 Governance and
Leadership 
Governance and
leadership
arrangements are
not conducive to
effective working and
lead to a lack of
strategic direction.
Amber
8
• Corporate
Governance
Improvement Plan
• Ongoing member
development
• Mentoring and
coaching for SMT
• Leadership
development
programme
• Chief Exec
Bilaterals
• A&B Manager’s
Course
• Established
partnership
governance
• Effective internal
audit function
• Scrutiny function
• Performance
Improvement
framework
• Council constitution
• Oversight
provided by Audit
& Scrutiny
Committee
• Decision making
committees open
to public
• Constitution
updated and
approved
annually by
Council
• IA reports and
follow up to DMT
and SMT
• Annual assurance
statements
• Fortnightly DMTs
– weekly ELT and
monthly SMTs
Internal Audit
• Continuous Monitoring
• Organisational Culture
(2018/19)
• Performance Mgt (2018/19
- High)
• Member Support (2018/19
- Substantial)
• Risk Mgt 2018/19 –
Substantial)
• Following The Public
Pound (2019/20 -
Reasonable)
• Annual self-assessment of
PSIAS – external peer
review every 5 years
• Formal Induction of new
Audit and Scrutiny
Committee Members 2022
• Risk Management (2023/24
- Substantial) 
There is a range
of assurance
sources across
the three lines of
defence
Page 148

Page 149

• Codes of conduct
for staff and
members
• Code of Corporate
Governance and
Annual Action Plan
• Scrutiny framework
and scrutiny plan
• Risk management
embedded
• Policy lead
meetings
• Area Committee
Business Days 
External Audit
• Ongoing independent
assurance reported in
AAR
• Best Value Assurance
Report (May 2020)
recognises improvements
in relationships between
members and senior
officers and more
constructive and focused
decision making 
Future
• Scheduled reviews of Risk
Management every two to
three years.
• Connect for Success
priorities now form the
basis of new corporate
improvements and are
being delivered.
• Review of governance
arrangements being
undertaken with new 
administration  to consider 
ongoing suitability of
arrangements. 
5 Engagement and
Understanding the
needs of the
Community 
The Council fails to
understand service
user needs and
emerging
demographic trends
and does not align
service delivery to
meet these.
Amber
9
• Annual budget
consultation
• Complaints process
• Community
Engagement
Strategy
• Customer
Service Board
• Various user
feedback (i.e.
Refugee
Resettlement,
commissioned
• Community
Planning
Partnership
• Service
Committees
• Area Committees
• DMT and SMT 
Internal Audit
• Community Empowerment
Act (2018/19 - High)
• Complaints Handling
(2021/22 – High)
• Customer Service Centre
(2022/23 – High) 
Other Agencies
• Education Scotland and
Care Inspectorate seek
views of service users 
There is a range
of assurance
sources across
the three lines of
defence
Page 149

Page 150

services,
community
council surveys)
• Parental
engagement
strategy
• Outreach service
• Democracy
matters
consultation
• Development Mgt
user forums 
External Audit
• Best Value Assurance
Report (May 2020)
highlights that Council has
made good progress with
the Community
Empowerment Act, and
regular monitoring in
relation to all other
outstanding issues have
been closed after regular
and detailed report to the
Audit and Scrutiny
Committee until June
2023.
Scrutiny
• Scrutiny – Community Asset
Transfers (2021/22)
• Scrutiny – Community
Engagement (2022/23)
Future
• A cross service working
group has been
developing a community
engagement framework,
based on self-assessment,
best practice, and
employee consultation.
The outcomes have been
agreed by ELT and the
framework is scheduled to
be approved by P&R on 5
December 2024. (2024/25) 
Page 150

Page 151

6 Service Delivery 
Insufficient resources
to ensure effective
service delivery
Amber
12
• Performance
Improvement
Framework
• Rolling out programme
of service self-
assessment
• Service improvement
plans
• Workforce planning
• Complaints process
• Use of LGBF
• Strategic  Plans with
Success Measures
aligned to Business
Outcomes
• Performance
Improvement Officers 
• Performance
reporting to A&SC,
Service
Committees and
Area Committees
• LGBF Review to
A&SC, Service
Committees and
Area Committees
• Self-Assessments
reported to SMT
and A&SC 
Internal Audit
• Performance Mgt (2018/19
- High)
• Complaints Handling
(2021/22 – High)
• IA annual plan is risk
based but also designed to
provide annual coverage
of all Heads of Service
• Internal Audit review of
Human Resources
(2023/24 – Substantial) 
External Audit
• Best Value Assurance
Report (May 2020)
highlights that there is
limited evidence of the
Council using performance
information to drive
improvement and that
Council’s performance
reporting makes it difficult
to conclude what progress
has been made against its
six corporate outcomes.
This has now been fully
addressed by the Council
and a final report was
presented to the Audit and
Scrutiny Committee in
March 2023 and all actions
signed off as complete. 
Future
• Review of Council’s
Performance Mgt
Framework being carried
out by Customer Support
Services and
implementation of
scheduled reviews. 
There is a range
of assurance
sources across
the three lines of
defence. 
Page 151

Page 152

7 Health and Social
Care Partnership 
Failure of the HSCP
to deliver on its
Strategic Priorities
results in
deteriorating health
and wellbeing
outcomes for the
population and / or
reduced access to
appropriate health
and social care
services. This could
also result in
financial and
reputational risk to
the Council.
Amber
12
• Strategic Plan
• Integration Scheme
• IJB has elected
member representation
including Council
Leader
• Elected member
representation on IJB
Audit Committee (inc
Vice Chair)
• Council’s CIA regularly
attends IJB Audit
Committee
• Regular engagement
between Council CFO
and HSCP CFO 
• Performance and
financial
monitoring and
reporting in place
and reported to
IJB Board
• HSCP Chief
Officer sits on
Council’s ELT 
Internal Audit
• The IJB has their own IA
function provided by the
Council’s IA function
(Contract started 1 April
2021)
• Council’s IA function also
provide assurance over 
social work services on an
annual basis 
• Internal Audit -  Charging
for Non-Residential
Services (2020/21 –
Substantial)
• Child Protective Services
(2021/22)
• Care Programme
Approach (2021/22)
• Complaints handling 
(2021/22 - Limited)
• Workforce Planning
(2021/22)
• Client Funds (2022/23 –
Limited)
• Learning and physical
Disabilities Care Packages
(2023/24 - Substantial)
• Client Funds (2023/24 -
Reasonable)
• SSSC Registration (2023/24
- Substantial) 
External Audit
• IJB’s external auditors are
Mazars. 
Future Internal Audits
• External Placements
(2024/25)
• Eclipse System Post
Implementation (2024/25) 
There is a range
of assurance
sources across
the three lines of
defence
Page 152

Page 153

8 Civil Contingency &
Business continuity
arrangements are
not effective.
Green
6
• Critical activity
recovery plans
• Emergency planning
test events
• West of Scotland local
resilience partnership
• Community resilience
plans
• EU withdrawal tactical
group 
• Emergency Mgt
Support Team
• EU tactical group
progress reported
to SMT
Internal Audit
• Business Continuity
(2019/20 - Reasonable)
• Internal Audit -  Disaster
Recovery Planning
(2020/21 - Limited)
• Internal Audit – Civil
Contingencies (2021/22-
Substantial)
Future
• The new BCM system has
been procured and
configured and a pilot
project to test the system
and the process is
underway with 3 service
areas, Procurement,
Customer Engagement
and Transformation
Management and
Residential (Care Home
Services). Once the
outputs form the pilot have
been reviewed and the
system goes live, all
services will be required to
complete a Business
Impact Analysis, which will
inform the basis for having
a business continuity plan
in place. This is expected
to be completed by 31
March 2025. 
Moderate third
level of defence
assurance at
current time. A
project has
commenced to
review business
continuity
processes,
covering critical
activities and
testing of
CARPS. 
This is an area
that will merit a
follow up audit in
the medium term
future. 
However
assurance can be
taken from the
Council’s
response to
COVID which
was fast paced
and has proven
to be effective. 
9 Waste Management 
Unable to dispose of
waste in landfill sites
due to the
implications of the
biodegradable
municipal waste
(BMW) landfill ban in
2021
Red
16
• Council rolling out new
waste strategy
• Using education and
publicity to increase
recycling 
• Performance
reporting to EDI
Committee
• Progress
monitoring by
DMT and SMT 
Internal Audit
• Waste Mgt (2018/19 -
Limited) 
Scrutiny
• Waste Mgt Strategy
(2020/21) - On 27 April
2021 the Head of Roads
and Infrastructure Services
provided a presentation to
Assurances over
this risk are
currently
moderate due to
the Council’s
Waste Strategy
being in its
infancy and the
full impact of the
BMW ban still to
Page 153

Page 154

the A&SC regarding the
Council’s Waste Strategy
followed by a question and
answer session. Following
the presentation the A&SC
members agreed they
were assured that
appropriate progress was
being made in relation to
the Council’s waste
strategy and that inclusion
of a specific scrutiny topic
focusing on the Strategy
would not add value at this
time.
• A briefing note was
requested by the A&SC in
June 2022 relating to
Waste Mgt and was
presented by the HoS in
September 2022.
• A briefing and update
report was presented to
the A&SC in December
2023 by the HoS. 
Future
• Confirmation received
from the Scottish
Government that £1.5m
has been made available
to support the compliance
with the BMW Ban. 
• Ongoing workshop
sessions to scope out and
design future disposal
models across all the
council area. These
models to be in place from
01/01/2026 in line with the
BMW requirements. 
be realised,
although now, in
part mitigated by
additional
funding. 
However full
implementation is
not till 2026. The
A&SC
determined they
are content that
progress is
reported to the
EDI Committee
and that the
A&SC will
maintain a
watching brief.
Page 154

Page 155

10 Service Delivery -
Cyber Security 
Unable to deliver
services to
customers because
of  failure of ICT
systems following
major cyber security
breach
Red
15
• ICT Security &
compliance officer in
post, producing weekly
threat analysis.
• Regular patching
regimes in place
• ICT Disaster recovery
plans tested regularly
• Critical activities have
recovery plans
developed (CARP’s) 
• Progress
monitoring by
DMT and SMT 
Internal Audit
• Business Continuity
(2019/20 - Reasonable)
• Disaster Recovery
Planning (2020/21 -
Limited)
• Internal Audit – Cyber
Security (2022/23 -
Substantial)
• Cloud Based Services
(2023/24 - Substantial) 
Other Agencies 
• PSN and Cyber Essentials
Plus accreditations for
corporate network (doesn’t
cover education network) 
Future
• Internal Audit – Data
Security and Information
Security (2024/25)
• IT Risk register and
Mitigation Processes
(2024/25) 
Moderate third
level of defence
assurance at
current time. A
project has
commenced to
review business
continuity
processes,
covering critical
activities and
review/testing of
CARPS. 
This is an area
that will merit a
follow up audit in
the medium term
future. 
11 Cost of Living
Crisis 
The Council are
unable to respond to
the implications
arising from the 'Cost
of Living' crisis 
Implementation of
welfare reform is not
managed well
resulting in increased
poverty and
deprivation or short
Amber
12
• Financial stability and
support to HSCP.
• Social Welfare and
Poverty Funding
assistance.
• Focused support and
multi-agency approach
where risk is
highlighted.
• Monitoring of trends in
service use to high
light any significant
change as a result of
financial hardship
• Targeted measures -
for example to those
• Progress monitoring
by DMT and SMT
• WRWG report to
SMT
• SMT monitor of risk
and consider high
and medium
hardship cases
• Anti-poverty strategy
approved by Council
• Child poverty action
planning monitored
by WRWG 
Internal Audit 
• HB & CTR (2018/109 –
Substantial)
• Internal Audit -  Scottish
Welfare Fund (2020/21 -
Substantial)
• Internal Audit -  Welfare
Rights (2020/21 -
Substantial) 
Other Agencies
• Focused support and
multi-agency approach
where risk is highlighted
There is a range
of assurance
sources across
the three lines of
assurance in
respect of welfare
reform. 
However, Limited
third tier
assurance in
respect of ‘Cost
of Living Crisis
but significant
evidence of pro-
active measures
and support.
Page 155

Page 156

term crisis. receiving Council Tax
reductions - via Gift
Cards and Flexible
Food and Fuel Fund.
• Financial Inclusion and
Advice Group
established.
• Joint working with
DWP, CPP and other
agencies.
• Flexible Food Fund
created. Supporting
householders in our
area with funds and
advice to address food
and fuel insecurities.
• Child Poverty Planning
Group set up and
active. 
Future Actions
• Extend flexible food and
fuel fund to March 2025.
• Supporting the Poverty
Alliance in their Tackling
Rural Poverty project,
observing its progress and
considering outcomes as
they emerge. 
• Preloved School Clothing
Bank operating across
Argyll and Bute. 
However
assurance can be
taken from the
Council’s
response to
COVID which
was fast paced
and has proven
to be effective.
12 Impact of Climate
Change 
The Council or
communities are
overwhelmed by
severe or more
frequent flooding,
landslides, rainfall,
storms, sea level
changes or hot
weather events due
to changes in global
temperature caused
by climate change.
Amber
12
• Continued delivery of
Council De-
Carbonization Plan
• Civil Contingencies
Manager liaising/
collaborating with
Regional Resilience
Partnerships and other
resilience partners in
terms of storm event,
hot weather events, cut
off communities,
landslides etc.
• Development and
delivery of an
integrated approach to
decarbonisation and
adaptation of Argyll
and Bute as a Region
via Community
Planning Partnership.
• Roads & Amenity
Services continue to
develop asset
management plan and
• Progress monitoring
by DMT and SMT 
Internal Audit
• Climate Change Act
(2021/22 - High)
• Internal Audit – Civil
Contingencies (2021/22-
Substantial) 
Future Actions
• Review of De-Carbonisation
Plan December 2024.
• Review scoring of business
cases and pipeline of
strategic projects with
enhanced climate change
considerations. 
There is a range
of assurance
sources across
the three lines of
defence
Page 156

Page 157

address strategic risks
in terms of rising sea
levels, bridge repairs,
and critical
infrastructure
vulnerability. 
13 Lack of Housing
Availability 
The Council, partner
agencies and
communities are
unable to attract and
retain working age
people due to lack of
housing and pricing
Red
20
• Council has declared a
Housing Emergency
• Housing Strategy and
Investment Plan
funded and
implemented/new
housing delivery group
established.
• Islands Programme
Award of Funding for
infrastructure for
worker accommodation
on Mull - this is for
phase 1 site
infrastructure to enable
delivery of
accommodation for
workers and will meet
clearly evidenced
community need.
• Progress monitoring
by DMT and SMT 
Future
• Housing summit held in
November and Action Plan
being continually
monitored/updated.
• Updates to the Local
Housing Strategy will
reflect the Council's
Housing Action Plan and
will be reported to Council
in November 2024. 
Limited third level
of defence
assurance at
current time as it
is a new item on
the Strategic Risk
Register.
However, pro-
active work is
planned with
partner agencies
and review of the
Housing
Strategy. 
Page 157

Page 158

This page is intentionally left blank

Page 159

ARGYLL AND BUTE COUNCIL  AUDIT AND SCRUTINY COMMITTEE
CHIEF EXECUTIVE  5 SEPTEMBER 2024 
STRATEGIC RISK REGISTER 
1.0  INTRODUCTION 
1.1  This report provides members with an update on the Council’s Strategic Risk
Register (SRR). 
2.0 RECOMMENDATIONS 
2.1 It is recommended that the Audit and Scrutiny Committee endorse the updated
SRR (Appendix 1).  
3.0 DETAIL
3.1 The Council’s Constitution requires the Chief Executive to attend one meeting
of the Audit and Scrutiny Committee per annum to report on how the Council
is addressing its key strategic risks and other matters of interest. Paul
Macaskill, Chief Internal Auditor (CIA) will present the update on behalf of the
Chief Executive.   
3.2 The new format of the SRR and the Operational Risks Registers (ORR) and
the associated processes to monitor and update them were revised. These are
subject to regular internal audit review which has confirmed compliance with
these procedures. 
3.3  The Council’s SRR continues to be updated by the SMT on a bi-annual basis
on dates agreed with the CIA however it will also be updated if and when the
Strategic Management Team (SMT) feel there is a specific requirement. 
3.4 As required by the revised risk management manual, the SMT also review all
risks in the ORRs which have been classified as ‘red’ by the Departmental
Management Teams (DMT) to determine whether they should be escalated
to the SRR. 
3.5 The CIA performs an annual strategic risk register assurance mapping
exercise which enables the Committee to assess the levels of assurance it
can take over the activity undertaken by the Council to manage its strategic
risks.  This, alongside the annual Internal Audit plan including a three year
cycle providing audit coverage across all the identified risks, provides
assurance that the Council continues to proactively manage its risks.   
Page 159 Agenda Item 12

Page 160

3.6 Appendix 1 to this paper provides a copy of the current SRR and
demonstrates how the Council are treating the identified risks in terms of the
mitigations currently considered to be in place and the action being taken to
further reduce the residual risk. 
4.0 CONCLUSION 
4.1 The SRR is subject to regular review by the SMT as are the red risks
highlighted in ORRs by the DMTs. Risks are actively managed to reduce their
impact upon the Council and the likelihood of them being realised. 
5.0 IMPLICATIONS 
5.1   Policy – Internal Audit continues to adopt a risk based approach to activity     
5.2   Financial –None     
5.3   Legal –None     
5.4   HR – None     
5.5   Fairer Scotland Duty – None   
5.5.1   Equalities – protected characteristics – None   
5.5.2   Socio-Economic Duty – None   
5.5.3   Islands – None      
5.6   Climate Change – None 
5.7   Risk – None      
5.8   Customer Service – None      
5.9   The Rights of the Child (UNCRC) – None 
Pippa Milne
Chief Executive
5 September 2024 
For further information please contact: 
Paul Macaskill, Chief Internal Auditor (01546 604108) 
Appendices:
1. Strategic Risk Register 
Page 160

Page 161

NEXT REVIEW DATE January 2025
Imp Like Sc Imp Like Sc
1
Population, External
Infrastructure and
Economic Decline
Failure to identify relevant
factors contributing to the
decline and failure to
develop strategies and
actions targeting these
factors.
Our Economy is
diverse and thriving
Population decline reduces available funding
impacting on Councils capacity to deliver services.
A circle of decline with reduced employment, lower
earning and failing businesses and poor perception of
the area.
Combined population and economic decline may
increase the need for and cost of services.
Insufficient people of working age with appropriate
skills and experience to fill vacancies across CPP.
Residual impact of withdrawal from EU. 
A continued trend of underinvestment in critical
economic infrastructure will make our area
increasingly uncompetitive as a place to live, work
and do business.  This includes transport and
infrastructure needs (physical and digital).
Without tackling infrastructure (including roads,
ports, ferries, grid, business space, utilities, housing
etc.) investments across Argyll and Bute, there are
significant barriers to growing the local economy,
attracting people, external investment and individual
entrepreneurship.
5 4 20
1. Local outcome improvement plan targets population,
infrastructure and economic recovery.
2. Maximise external funding opportunities.
3.  New Economic Strategy approved at the June EDI
Committee.
4. Rural Growth Deal reaching full deal status in September
2024.
5. UK Shared Prosperity Funding Investment Plan agreed
covering 2022/23 to 2024/25.  
6. AB Place to B/Promote and Market Argyll and Bute.
7. Taking a place based approach to regeneration including
maximising social-eco benefits/community wellbeing via
effective procurement strategy, development of the
circular economy and partnership working across sectors.
8. Invest in Argyll and Bute website established.
4 4 16 Treat
1. Lobbying activity in pursuit of regional immigration
policies and related strategies.
2. Rural Growth Deal Outline Business Cases and Final
Business Cases being worked on and signing of Full
Deal Agreement is expected in September 2024.
3.Levelling Up Partnership status confirmed - projects
up to the  value of £20m to be developed for delivery
in 2025. 
4. UK Shared Prosperity Funding Investment Plan is
being actioned as per plan. 
5. Preparation of a pipeline of projects across Argyll
and Bute in order to be able to react to any other bid
funding as and when it is announced.                                
6. Multi-agency approach to refugee settlement
underway linking with national processes and
agendas.
7. The council will continue as a partner of the
Highlands and Islands Regional Economic Partnership
and lobby for Government investment to realise
economic opportunity and address barriers to future
sustainable growth.
8. The council working with HIE will deliver a smart
action plan for the new Economic Strategy. 
Jun-24 Kirsty
Flanagan
2
Condition and suitability of
Infrastructure & Asset
Base
Infrastructure and asset
base does not meet
current and future
requirements and is not
being used or managed
efficiently and effectively.
Our Infrastructure
supports sustainable
growth
Infrastructure and asset base does not support
or is not aligned to business outcomes and does
not aid effective service delivery.
Infrastructure and asset base is allowed to
deteriorate resulting in cost, lost opportunities
and wasted resource.
5 5 25
1. Capital Investment Board oversight of implementation 
of Capital Investment Strategy.
2. Robust capital planning and monitoring.
3. Asset management work plan.
4. Business case modelling including sustainability,
development and strategic change.
5. Intelligence and best practice sharing via Heads of
Property Group.
6. Community Empowerment and Community Asset
Transfer – Arrangements in place to evaluate and
determine requests.
7. Roads Asset Management Plan and Status and Options
Report.
8. RIS Review Project Board.  
9. One Council Property Approach.
10. Continuing with successful bids for external funding. 
4 3 12 Treat
1. Development of finalised capital strategy in
2023.
2. 'Modern Workspace Programme' will review,
engage and rationalise property portfolio for
future needs of the Council.  Changes will take
place on phased and town by town basis.
Programme will be running for 3 years - April
2025
3. Project Manager from PPMS appointed to take
forward development and implementation of
programme. Lochgilphead, Islay and Dunoon
identified as priorities. Interim solution for
Lochgilphead will be in place in Q4 FY23/24 to
provide maintenance facility for larger vehicles).
Jun-24 Kirsty
Flanagan and
Douglas
Hendry
3
Financial Sustainability
Insufficient resource to
meet current and future
service requirement.
Budget not aligned / does
not support business
outcomes.
Enablers Unable to deliver Local outcome improvement
plan.
Reduction in performance.
Reputational damage.
4 4 16
1. Longer term financial planning and financial strategy.
2. Income generation activity.
3. Robust budget preparation and budget monitoring
protocols.
4. Maintaining adequate contingency with reserves.
5. Digital transformation.
6. Effective workforce planning model.
7. Business Outcomes.
8.  Financial Services resilience building project including
knowledge sharing and development of guidance notes.
4 3 12 Treat
1.  Rural Growth Deal Outline Business Cases and
Final Business Cases being worked on and signing
of Full Deal Agreement is expected September
2024.
2. Investment in professional training through
Grow Our Own Activity.
3. External reviews of major budget areas e.g.
RIS, education.
4. Consider the implications and opportunities
from the Visitor Levy (Scotland) Bill which could
generate additional income from 2026/27.
5. Completion of external review of Roads and
Infrastructure Services stages 2 - 4 should realise
savings for future years.
6. A review of Education to commence on a
similar basis as the RIS review. 
Jun-24 Kirsty
Flanagan
4
Governance and
Leadership
Governance and leadership
arrangements are not
conducive to effective
working and lead to a lack
of strategic direction.
All Corporate Outcomes Poor decision making, lack of strategic
direction.
Lack of operational direction.
Confidence in, and reputation of, the Council
harmed.
Deterioration in performance.
4 4 16
1. New Council Administration in place with working
majority.
2. Development sessions for new Administration to cover
areas such as being effective leaders, strategic thinking
and working with officers.
3.  Working with Policy Leads to provide support and
development opportunities.
4. Continued programme of Member Seminars.
5. Progressing with programme of Member Development
including 1:1 conversations.
6. New Administration working on an updated set of
priorities to be agreed by Council.
7. Corporate Plan sets out objectives.
8.  Performance Improvement Framework and Service
Planning.
9. Leadership development programme.
10. Council constitution regularly reviewed and updated.
11. Established partnership governance arrangements.
12. Scrutiny arrangements in respect of Police, Fire and
Health.
13. Governance arrangements for scrutiny established.
4 2 8 Treat
1. BV Action plan complete and remaining
actions mainstreamed.
2. Connect for Success priorities now form the
basis of new corporate improvements and are
being delivered.
3. Pilot self-assessments have been completed
and guidance is being updated to reflect learning.
4. The Performance Excellence Project Phase 1 is
complete and phase 2 is reviewing the
Performance and Improvement Framework.
5. Leadership Development  Programme
Commenced  in March 24 with 360 degree
assessments and initial coaching sessions now
underway.
6. Review of  governance arrangements being
undertaken  with new  administration  to
consider  ongoing suitability of arrangements.
Jun-24 Pippa Milne
5
Engagement and
Understanding the needs
of the Community
The Council fails to
understand service user
needs and emerging
demographic trends and
does not align service
delivery to meet these.
People live active,
healthier and
independent lives
Enablers
Prioritisation of services may not be aligned to
community needs.
Gaps between community needs and Council
services.
Ineffective partnership working.
Services not configured to meet user/citizen
requirements.
3 4 12
1. Community Planning partnership has agreed new Argyll 
and Bute Outcome Improvement Plan  based on
demographically representative consultation exercise and
governance arrangements  are currently being refreshed
to ensure a focus on action with suitable representation
from partner organisations and Area Community Planning
Groups.
2. Community Engagement Strategy to be  supported by
clear framework and guidance as developed by the
Community Engagement Group.
3. Customer Service Board.
4. Operation and development of panels and forums.
Young people’s plan, citizens panel.
5. Budget Consultation .
6. Comprehensive Complaints Protocols.
7. Demographic and end user analysis.
3 3 9 Treat
1. A working group has been established to
review our approach to Community Engagement
and to develop a Framework. The group has
developed a terms of reference and is in the
process of carrying out a self-assessment to
identify strengths and areas for improvement.
Early indications are that we have areas of
excellent practice, but a lack of consistency
across services.  A series of draft outcomes have
been identified and an action plan is under
development. A collaborative space for sharing
engagement activity is being developed. Updates
will be reported via Highlight Reports to the
Change Programme and to SMT.
2. Approach to area plans currently being
reviewed to reflect the priorities of the new
administration. 
3. Analysis of latest census data being
undertaken to inform future strategic activity.
Report to Council anticipated in September.
Jun-24 Pippa Milne
6
Service Delivery
Insufficient resources to
ensure effective service
delivery.
Enablers Services fail to achieve agreed performance
levels and as a result are not contributing fully
to Council objectives.
Resources are poorly managed with result that
agreed outcomes and objectives are not fully
achieved.
Unable to achieve continuous improvement and
improve effectiveness and efficiency.
4 4 16
1. Performance Improvement Framework.
2. Service Improvement plans.
3. Argyll and Bute Manager programme.
4. Customer needs analysis Protocols.
5. Demographic and end user analysis.
6. Workforce Planning .
7. Internal and External Scrutiny Arrangements.
8. Complaints process.
4 3 12 Treat
1. Monitor progress of performance mgt project
and implement recommendations -
implementation in 2023/24.
2. Completion of external review of Roads and
Infrastructure Services should generate
opportunities and savings during 2024/25 with
further savings realisable in future years. 
3. A review of Education to commence on a
similar basis as the RIS review.  
Jun-24 Kirsty
Flanagan and
Douglas
Hendry
7
Health and Social Care
Partnership
Failure of the HSCP to
deliver on its Strategic
Priorities results in
deteriorating health and
wellbeing outcomes for the
population and / or
reduced access to
appropriate health and
social care services. This
could also result in
financial and reputational
risk to the Council.
People live active,
healthier and
independent lives
Partnership viewed as having failed or not
achieved strategic objectives.
Partnership Failure or weakness exposes
Council to significant Financial liability.
Confidence in, and reputation of, the Council
harmed.
Unclear repercussions of financial and staffing
effects of the implementation of the National
Care Service on the Council and HSCP.
Residual Covid-19 implications for ongoing
health and social care services.
5 4 20
1. HSCP integration scheme approved by Scottish
government.
2. Strategic Plan in place.
3. Performance and Financial reporting arrangements in
place.
4. Independent audit arrangements in place.
5. Integrated Joint board with elected member
representation including Council Leader.
6. Chief Officer member of ABC Senior Management Team
with co-location of officers.
7. Tripartite leadership agreement.
8. Monitoring and improvement of HSCP financial position.
9. Medium term Financial Plan in place.
10. Establishment of Strategic and Tactical Groups with
links to HSCP, NHS and national/regional resilience groups.
4 3 12 Treat
1. Develop options to deliver sustainability of
future years budgets (ongoing).
2. Develop a longer term Financial plan and
implement the value for money strategy.
3. Assessment of the financial implications on the
Council of services transferring to the NCS when
plans are sufficiently developed to enable this.
4. Progression of Service Transformation work,
Estates Strategy and long term strategic service
development with Hub North.
5. Implementation of the workforce strategy.
6. Remobilisation of services post Covid and
improved performance management and
reporting processes.
Jun-24 Fiona Davies
and Pippa
Milne
Residual Risk Approach Key Actions and Deadlines Last Reviewed Risk Owner
STRATEGIC RISK REGISTER
No Risk Corporate Outcome Consequences Gross Risk Current Mitigation
Page 161

Page 162

8
Civil Contingency &
Business continuity
arrangements are not
effective.
People live in safer
and stronger
communities
Ineffective management of major emergencies
affecting Council services and communities in
Argyll and Bute.
Incident and recovery phase of an emergency
lead to greater inconvenience and hardship and
a longer timescale for return to normal.
Council unable to effectively deliver its own
services.
2 4 8
1. Emergency Planning Test events.
2. Critical Activity Recovery Plans.
3. Roll out of Community resilience partnership
programme.
4. Peer review of major exercises undertaken to provide
external validation of planning process.
5. West of Scotland local resilience partnership.
6. Cross sector expertise and partnership working.
7. Emergency Management Support Team (EMST)
meetings.
8. Training.
9. EU Withdrawal Tactical Working Group with
arrangements for reporting to the West of Scotland
Resilience Partnership.
2 3 6 Treat
1. The Council’s critical activity recovery plans
(Carps) are reviewed annually. The project for the
review of Business Continuity processes within
the Council is underway and will include a review
of the Council’s critical activities and the
potential for a software solution which would
automate processes and provide a more efficient
an effective service and ensure greater resilience
for the Council. When the project is completed in
23/24 it will include a programme of testing of
the updated Carps.  Date 31 March 2024.
2. Review of BC processes has resulted in
introduction of new BCM system which will allow
more automation and oversight of plans and
review of critical activities with an enhanced
ability to test these. The new system is expected
to be procured by 31 March 2024. The new BCM
system has been procured and configured and a
pilot project to test the system and the process is
underway with 3 service areas, Procurement,
Customer Engagement and Transformation
Management and Residential (Care Home
Services). Once the outputs form the pilot have
been reviewed and the system goes live, all
services will be required to complete a Business
Impact Analysis, which will inform the basis for
having a business continuity plan in place. This is
expected to be completed by  31 March 2025.
Jun-24 Douglas
Hendry
9
Waste Management
Unable to dispose of waste
in landfill sites due to the
implications of the
biodegradable municipal
waste (BMW) landfill ban in
2025.
Our Infrastructure
supports sustainable
growth
Alternative delivery models would be likely to
be more expensive than the current one which
would result in cost pressures having to be
accommodated by other services and service
provision reduced.
5 4 20
1. Helensburgh and Lomond waste solution available via
third party off-takers, higher rates have been accepted by
the council and the contract is in place until the end of
2023 with the opportunity to extend 1+1 years. It is likely
over the course of 2023 an alternative procurement
process will be explored with a view to putting in place a
BMW compliant solution at the earliest opportunity.
2. At the EDI committee in December agreement was
reached to seek a derogation to continue operating the
PPP contract until September 2026. This will be alongside
BMW compliant solutions for island settings and
Helensburgh and Lomond (i.e all areas out with the PPP
contract). Post Sept 2026 it is envisaged that BMW
complaint solutions will be in place for all council areas.
With there being uncertainty around the derogation
request officers are also progressing in tandem a possible
contract variation which would change the MBT plants
within the PPP contract to become waste transfer stations
to facilitate material to be shipped to a suitable off-taker.
3. SEPA have advised  they are unable to provide
reassurance on enforcement approach beyond their
stated policy. Further approach now being made to FM to
seek a solution or required  funding.
4 4 16 Treat
1. Confirmation received from the Scottish
Government that £1.5m has been made available
to support the compliance with the BMW Ban.
2.  Transition process underway with Renewi to
facilitate the end of contract arrangements for
Sept 2026.
3.  Ongoing workshop sessions to scope out and
design future disposal models across all the
council area. These models to be in place from
01/01/2026 in line with the BMW requirements.
Jun-24 Kirsty
Flanagan
10
Service Delivery - Cyber
Security
Unable to deliver services
to customers because of 
failure of ICT systems
following major cyber
security breach.
Our Economy is
diverse and thriving
Threat of ransomware attacks. Data corruption
of ICT system caused by malware and/or loss of
confidential data.
ICT Systems unavailable for considerable period
whilst recovery from uncorrupted backups
takes place.
Meanwhile Services fail to achieve agreed
performance levels and as a result are not
contributing fully to Council objectives.
Reputational damage to Council and potential
financial losses (fines, loss of income).
5 4 20
1. ICT Security & compliance officer in post, producing
weekly threat analyses, member of CiSP.
2. PSN and Cyber Essentials Plus accreditations for
corporate network.
3. Regular patching regimes in place.
4. ICT Disaster recovery plans tested regularly.
5. All critical activities have recovery plans developed
(CARP’s).
6. Mimecast monthly cyber security training videos for all
staff.
7. Enforce password changes when found to be weak.
8. Technical cyber exercise completed and Business
Continuity Planning exercise conducted with senior
management and other staff.
9. Internal Audit on Cyber Security completed with the
Audit Opinion as substantial.
5 3 15 Treat
1. Review will be ongoing on all contingency plans
with updated knowledge from SEPA, Western
Isles Council and UHI Cyber Attacks.          
2. Work with Scottish Government Cyber
Resilience Team to test ICT response.             
3. Continued close review of disaster recovery
plan and associated tests, finalise and test
incident response procedure, and review of
mirroring between the 2 data centres (monthly
at ITMT) and backup.            
4. Review and progress requirements for
Education Network to achieve CE+ accreditation
(going to P&R in August).              
5. Procure a Security Operations Centre service
to improve our 24x7 security posture.
6. Mimecast has now been made mandatory
across the Council and ELT will be monitoring the
uptake from staff              
Jun-24 Kirsty
Flanagan
11
Cost of Living Crisis
The Council are unable to
respond to the implications
arising from the 'Cost of
Living' crisis.
Implementation of welfare
reform is not managed well
resulting in increased
poverty and deprivation or
short term crisis.
Our Economy is
diverse and thriving
People live active,
healthier and
independent lives
1. Unable to meet demands for assistance
stemming from financial hardship.
2. Increases on the demand for Council services
such as homelessness.
3. Financial implications for the Council as
revenue income could fall correlating to
financial hardship - Financial Sustainability.
4. Implications for staff, particularly those
working from home.
5. Adverse impact on workforce, communities
with regards to economy and demographic
statistics.
6. Financial Inclusion and Advice Group
established.
7. Joint working with DWP, CPP and other
agencies.
8. Child Poverty Planning Group set up and
active.
9.  Flexible Food Fund created. Supporting
householders in our area with funds and advice
to address food and fuel insecurities.
4 4 16
1. Financial stability and support to HSCP.
2. Social Welfare and Poverty Funding assistance.
3. Focused support and multi-agency approach where risk
is highlighted.
4. Monitoring of trends in service use to highlight any
significant change as a result of financial hardship.
5. Targeted measures  - for example to those receiving
Council Tax reductions - via Gift Cards and Flexible Food
and Fuel Fund.
6. Financial Inclusion and Advice Group established.
7. Joint working with DWP, CPP and other agencies.
8. Flexible Food Fund created. Supporting householders in
our area with funds and advice to address food and fuel
insecurities.
9. Child Poverty Planning Group set up and active.
4 3 12
Treat 1. Review and monitor changes in demand for
key services which correlate to personal effects
arising from financial distress.
2.  Extend flexible food and fuel fund to March
2025.
3. Continue to support High and Medium priority
spends in SWF which is continually monitored.
4.  Deliver sustainable school clothing bank
across the Argyll and Bute area by March 2025,
with support from the UK Shared Prosperity
Fund.
5. Provision of welfare rights advice services in
GP Surgeries in MAKI area via funding from SG
until March 2025.
6. Supporting the Poverty Alliance in their
Tackling Rural Poverty project, observing its
progress and considering outcomes as they
emerge.
Jun-24 Pippa Milne
and all ELT
12
Impact of Climate Change
The Council or
communities are
overwhelmed by severe or
more frequent flooding,
landslides, rainfall, storms,
sea level changes or hot
weather events due to
changes in global
temperature caused by
climate change.
Our Infrastructure
supports sustainable
growth
1. Unable to meet national and Scottish
Government guidance in terms of meeting
Climate Change Obligations - various
milestones.
2. Inability to deliver core services due to
failures in critical infrastructure - ferrys, roads,
bridges, landslides, fallen trees etc.
3. Human casualty, death and community
resilience if cut off or directly impacted by
severe storms, landslides, flash foods or failed
infrastructure.
4. Disruption of flow of goods, services and
supply chains.
5. Adverse impact on workforce, communities
with regards to economy and population. 
5 4 20
1. Continued delivery of Council De-Carbonisation Plan.
2.  Civil Contingencies Manager liaising/ collaborating with
Regional Resilience Partnerships and other resilience
partners in terms of storm event, hot weather events, cut
off communities, landslides etc.
3. Development and delivery of an integrated approach to
decarbonisation and adaptation of Argyll and Bute as a
Region via Community Planning Partnership.
4. Roads & Amenity Services continue to develop asset
management plan and address strategic risks in terms of
rising sea levels, bridge repairs, critical infrastructure
vulnerability.
5. A review of all critical transport routes in light of
October 2023 severe weather event to identify any
additional mitigations needed to maintain resilient routes.
4 3 12
Treat 1. Review of De-Carbonisation Plan December
2024.
2. Consideration of all Council Papers with
climate change as consideration / implications -
ongoing.
3. Review scoring of business cases and pipeline
of strategic projects with enhanced climate
change considerations.
Jun-24 Pippa Milne /
Kirsty
Flanagan /
Douglas
Hendry
13
Lack of Housing availability
The Council, partner
agencies and communities
are unable to attract and
retain working age people
due to lack of housing and
pricing.
All Corporate Outcomes Direct impact on property prices with
substantial increases in our area.
Lack of private rentals. 
Inability to attract working age people to live
and work in the area which therefore affects
the demographics of the area.  5 4 20
1. Council has declared a Housing Emergency.
2. Housing Strategy and Investment Plan funded and
implemented/new housing delivery group established.
3. Islands Programme Award of Funding for infrastructure
for worker accommodation on Mull - this is for phase 1
site infrastructure to enable delivery of accommodation
for workers and will meet clearly evidenced community
need.
5 4 20
Treat 1. Explore and develop a series of options in
response to the housing emergency.
2. Address key barriers to housing.
3. Consider radical delivery models.
4. Updates to the Local Housing Strategy will
reflect the Council's Housing Action Plan and will
report reported to Council in November 2024.
5. Housing summit held in November and Action
Plan being continually monitored/updated.
Jun-24 Pippa Milne /
Kirsty
Flanagan /
Douglas
Hendry
Page 162

Page 163

Audit Progress Report
Argyll and Bute Council
September 2024
Page 163
Agenda Item
13

Page 164

Contents
Audit progress
National publications
01
02
Page 164

Page 165

01Audit progress
Page 165

Page 166

Audit progress
Purpose of this report
This report provides the Audit and Scrutiny Committee with information about progress in delivering our responsibilities as external auditors for the Council.
We are committed to the delivery high quality audits. In this context, we have planned to complete the 2023/24 audit by December 2024 including presenting the annual audit report to the
Committee, with the Best Value work planned to be completed in October 2024.
We completed the planning/risk assessment and interim phases of the 2023/24 audit and are currently in the fieldwork phase of the audit, with no changes at present to our audit approach
including our identified significant and enhanced risks which we presented to you in the Annual Audit Plan. There has however been an update in materiality level figures, as at planning
stage our materiality was based on the Gross Revenue Expenditure in the  signed financial statements for 2022/23, and this has now been updated for the same benchmark but in the
unaudited financial statements for 2023/24.
We have met regularly with the finance team as the audit progresses, and we will continue to do so.
We will also provide a verbal update to the Committee on the latest position for the 2023/24 audit during the meeting of the Committee on 5 September 2024.
The audit of the Charitable Trusts for 2022/23 is ongoing, and the audited accounts will be tabled for approval at the  September 2024 Council meeting.
Forvis Mazars
We are delighted to introduce you to Forvis Mazars: a new global Top 10 network. Launching on 1 June 2024, Forvis Mazars has been designed for and around our clients. As a network of
just two firms, and operating in over 100 countries, Forvis Mazars has been built with the scale, capacity, and expertise to support our clients’ needs worldwide.
Your key contacts and our ways of working remain unchanged. For now, there will be no change to our contact email addresses.
Further information on Forvis Mazars can be found here: Forvis Mazars Accountants - Audit, Tax and Advisory Services - United Kingdom
Page 166

Page 167

02National publications
Page 167

Page 168

Publication/update Key points
Chartered Institute of Public Finance and Accountancy (‘CIPFA’)
1 CIPFA Bulletins CIPFA have issued two Bulletins to provide further guidance on the financial reporting requirements.
Audit Scotland and the Accounts Commission
2 Accounts Commission Annual Report 2023/24 The Accounts Commission has published its 2023/24 Annual Report summarising the work performed during the year.
3 Accounts Commission – Benchmarking The Accounts Commission in this publication emphasises the importance of local government bodies using the Local Government
Benchmarking Framework in its performance assessment.
4
Audit Scotland – Tough Decisions ahead on Climate
Change The Auditor General here outlines that decarbonisation of heating in homes in Scotland is the subject of his next major climate change
report
Other
5 Forvis Mazars – Preparing for the Procurement Act 2023 The Procurement Act 2023 is set to transform the procurement procedures for public sector bodies. Our latest article provides an in-
depth overview of the new Procurement Act.
6 Forvis Mazars – Understanding the new ‘Failure to Prevent
Fraud’ Offence in a Public Sector context
The UK Government has recently announced a new corporate criminal offence – the 'failure to prevent fraud' offence – within the
Economic Crime and Corporate Transparency Act 2023.
National publications
Page 168

Page 169

National publications
CIPFA
1. CIPFA Bulletins
Bulletins issued by CIPFA, with the assistance of CIPFA panels, provide practitioners with topical guidance on specific issues and accounting and reporting developments. CIPFA has
issued the following Bulletins in recent months:
CIPFA Bulletin 17 Closure of the 2023/24 Financial Statements
This bulletin covers the closure of accounts for the 2023/24 year and provides further guidance and clarification to complement the 2023/24 Code of Practice on Local Authority Accounting
in the United Kingdom: Guidance Notes for Practitioners (Code Guidance Notes). It addresses, where relevant, frequently asked questions and other issues that have arisen since the
publication of the 2023/24 Code Guidance Notes.
Link: CIPFA Bulletin 17 Closure of the 2023/24 Financial Statements
CIPFA Bulletin 16 Local audit delays and the publication of the annual governance statement
CIPFA Bulletin 16 Local audit delays and the publication of the annual governance statement is intended to provided clarity to those authorities with at least one set of unaudited financial
statements for prior years, and their external auditors, on the update of the annual governance statement (‘AGS’).
Link: CIPFA Bulletin 16 Local audit delays and the publication of the annual governance statement
Page 169

Page 170

National publications
Audit Scotland
2. Accounts Commission Annual Report 2023/24
In this report, the first one under the current Chair of the Accounts commission, the summary results of the Accounts Commission Best Value reports are presented, covering the 5 councils
subject to review between November 2023 and March 2024. Statutory reports’ Commission findings for two councils are also covered in this report.
The report also recaps on the Commission’s new approach to overview reporting, highlighting that In October 2023 the Commission agreed a new approach to overview reporting, to move
away from this single large annual overview report (plus a financial bulletin) to a broader suite of local government outputs that are shorter and are published throughout the year.
Accounts Commission Annual Report 2023/24 (audit.scot)
3. Accounts Commission: Benchmarking and good public performance reporting matter
The Accounts Commission in this publication emphasises the importance of local government bodies using the Local Government Benchmarking Framework (LGBF), highlighting that the
pace of improvement in councils is slowing. The Accounts Commission also highlights that it expect councils to use the LGBF as part of their approach to self-evaluation and performance
reporting using the underlying principles of:
• Transparency and clarity in the public information that shows delivery of local priorities and the performance of services
• Comparison and benchmarking with councils with similar populations and areas (family groups) to drive improvement
• Trends in performance over time so the direction of travel is clear.
• Driving decision-making through the use of performance data to identify improvement priorities
The Accounts Commission further recaps that it directs councils to report on performance through its Statutory Performance Information Direction.
https://audit.scot/publications/benchmarking-and-good-public-performance-reporting-matter
4. Audit Scotland: Tough Decisions ahead on Climate Change
In this blog the Audit General highlights that climate change remains an audit priority for him. He explores the challenges, including financial, facing the public sector in reducing carbon
emissions. He confirms that his next major climate change report will be on how Scotland is planning to decarbonise how we heat our homes.
Tough decisions ahead on climate change | Audit Scotland
Page 170

Page 171

National publications
Other
5. Forvis Mazars – Preparing for the Procurement Act 2023
The Procurement Act 2023 is set to transform the procurement procedures for public sector bodies in the UK by:
• Enhancing transparency in procurement processes, requiring greater disclosure of information about procurement opportunities;
• Improving efficiency by introducing new measures such as electronic procurement platforms; and
• Promoting fairness to ensure all suppliers have equal access to government contracts.
Our latest article provides an in-depth overview of the new Procurement Act, including when it will be implemented, key provisions and how public sector organisations can prepare.
Preparing for the Procurement Act 2023
6. Forvis Mazars – Understanding the new ‘Failure to Prevent Fraud’ Offence in a Public Sector context
The UK Government has recently announced a new corporate criminal offence – the 'failure to prevent fraud' offence – within the Economic Crime and Corporate Transparency Act 2023.
Fraud is currently the most common crime in the UK, and this new offence is designed to drive a cultural shift, encouraging organisations to improve their prevention procedures and
reduce instances of fraud. It strengthens existing powers to fine and prosecute organisations for fraud committed by their employees and agents, closing loopholes that have allowed
organisations to avoid prosecution in the past.
This new offence holds large organisations, both in the public and private sectors, accountable for fraudulent activities committed by their employees or agents.
'Failure to Prevent Fraud' in the Public Sector
Page 171

Page 172

Contact
Forvis Mazars
Forvis Mazars LLP is the UK firm of Forvis Mazars Global, a leading global professional services network. Forvis Mazars LLP is a limited
liability partnership registered in England and Wales with registered number OC308299 and with its registered office at 30 Old Bailey, London,
EC4M 7AU. Registered to carry on audit work in the UK by the Institute of Chartered Accountants in England and Wales. Details about our
audit registration can be viewed at www.auditregister.org.uk under reference number C001139861. VAT number: GB 839 8356 73
© Forvis Mazars 2024. All rights reserved.
Mark Outterside
Director
Mark.Outterside@mazars.co.uk
Gregory Oduor
Manager
Gregory. Oduor@mazars.co.uk
Page 172

Page 173

ARGYLL AND BUTE COUNCIL  AUDIT AND SCRUTINY COMMITTEE 
FINANCIAL SERVICES  5 SEPTEMBER 2024 
SCRUTINY – ESTABLISHMENT OF A PANEL FOR THE REVIEW 2024-25 
1. INTRODUCTION  
1.1 The objective of the report is to provide the Audit and Scrutiny Committee
(the Committee) with an update arising from the recent change in
administration, outline the potential options in order to increase resilience
within the Committee for undertaking scrutiny reviews, and to ask the
Committee to identify a Panel. In addition, to take forward the review of
Complaints in the context of the Scrutiny Manual and Framework as part of
the Committee’s scrutiny role for 2024-25.  
2. RECOMMENDATIONS  
2.1 The Audit and Scrutiny Committee is asked to:  
2.1.2 Establish a Panel for the agreed scrutiny review relating to the Council’s
complaints process. (The previous arrangements agreed by the Committee, in
terms of identifying the Chair to lead the review, have been superseded by the
change of Administration and composition of Members within the Audit and
Scrutiny Committee).  
2.1.3 
2.1.4
In the event that the Committee are minded to proceed with this approach,
appoint a Panel Chair and three further Members to form a Scrutiny Panel for
the review, which will commence within financial year 2024-25. It is suggested
that this would consist of the Chair and Vice-Chair of the Committee and a
further two members to be identified. (This approach would allow a basis for
the wider development of skills within the Committee to undertake and
participate in future scrutiny reviews). 
In support to the Membership of the Panel, the former Chair of the Committee,
Martin Caldwell, will provide mentoring support to the new Panel in order to
build up experience and skills in undertaking scrutiny work. Officer support will
be provided as required.  
3 DETAIL  
3.1 The development of the scrutiny function has progressed successfully, and in
in the new format, a total of three reviews have been undertaken. The
Committee have found such reviews helpful in discharging their role in relation
to scrutiny and the Committee agreed in March 2024 that one review would
be undertaken in 2024-25 and a review of Complaints would be taken forward
as the preferred choice which would be of benefit to the Council. It is also
important to balance the Committee’s work in relation to scrutiny with its
primary duty, which is to seek the successful delivery of the agreed Internal
Audit Plan. 
Page 173 Agenda Item 14

Page 174

3.2 The change of Administration within the Council, and the composition of the
Council’s Committees has resulted in changes within the make up of the Audit
and Scrutiny Committee, together with a new Chair and Vice-Chair.
Experience within the Committee to undertake scrutiny review is now limited.
In order to build experience and facilitate mentorship of the Chair and Vice-
Chair, in respect of leading such scrutiny reviews, it is proposed that the
former independent Chair, Martin Caldwell support the Panel Chair and Vice-
Chair by facilitating this scrutiny review. This would provide members with the
appropriate skills and experience to confidently undertake such reviews going
forward. A significant amount of staff resource can be expended on scrutiny
reviews. As a section we need to balance this work with available staff
resources to keep within the allocated resource envelope to complete the
scrutiny review without affecting the core primary function of undertaking the
approved Internal Audit Plan for 2024-25.       
Approach to Scrutiny previously agreed by the Committee– Context and
Background 
3.3 In order to provide further context to the development of ‘scrutiny reviews’; a
Development Session was held to establish the process to be adopted by the
Committee to identify and prioritise potential scrutiny topics and of the overall
approach adopted to scrutiny reviews which has been a combination of panel
reviews and ‘scrutiny lite’ where relevant officers have been asked to present
at Committee or at Development Sessions on topics of interest to the
Committee. 
3.4 In particular the Chief Internal Auditor (the CIA) asked the Committee to
consider some key questions. These, and the Committee responses, are
summarised in the table below.  
3.5 Question Committee Response
Should Scrutiny topics
originate from all members
and senior officers or from
Committee members?
There needs to be a degree of flexibility to
change topics and to be able to react quickly
to an ever changing environment. 
It is for the Committee to determine scrutiny
topics. 
If topics originate from the
committee should this be
via discussions at
Committee or development
sessions? 
We may need to meet as a Committee more
often however these could be less formal
meetings and held virtually. Further thought
can be given to this as to some extent it will
depend on the number of emerging topics to
be considered for scrutiny. 
Do we still need an annual
scrutiny plan or should
topics for scrutiny ‘emerge’
as the year goes by?
We don’t need a plan we should allow items
to emerge. 
Do we still need the detailed
prioritisation process? 
The prioritisation process is there as a tool if
we need it but we don’t need to use to
assess every scrutiny topic. 
Page 174

Page 175

Do we have the right
balance between ‘full blown’
panel approach vs Scrutiny
Lite? 
There has been value in having the full
panels but these are resource intensive and
we should look to make use of a scrutiny lite
approach where appropriate.  Once a topic
is decided then the Committee can decide
what the best Scrutiny approach to adopt is. 
3.6 The CIA has reviewed and updated, where identified, the Scrutiny Framework
and Manual in 2023/24 and will do so on an annual basis in order that the
approach to scrutiny work is both focused, appropriate and reflects the best
approach taking cognisance of the Committee’s views. 
4. CONCLUSION  
4.1 The recent changes at Chair and Vice-Chair level have resulted in a gap in
experience of leading and undertaking scrutiny reviews. To improve
resilience, knowledge and experience within the Committee to undertake and
lead scrutiny reviews, the Committee should accept the offer of mentoring and
overview from an experienced person in order to facilitate the next review
along with support from officers. 
5 IMPLICATIONS  
5.1 Policy – None
5.2 Financial – None
5.3 Legal – None
5.4 HR – None
5.5 Fairer Scotland Duty – None
5.5.1 Equalities – protected characteristics – None
5.5.2 Socio-economic Duty – None
5.5.3 Islands – None
5.6 Climate Change – None
5.7 Risk – None
5.8 Customer Service – None
5.9 The Rights of the Child (UNCRC) – None 
Paul Macaskill 
Chief Internal Auditor
5 September 2024                                                  
For further information contact: 
Paul Macaskill, Chief Internal Auditor (01546 604108) 
Page 175

Page 176

This page is intentionally left blank

Page 177

Audit & Scrutiny Committee Work Plan 2024 – 2025 
This is an outline plan to facilitate forward planning of reports to the Audit & Scrutiny Committee 
Report  Lead Service Regularity
5 September 2024 Reports to Committee Services by 12 August 2024
Internal Audit and Counter Fraud Summary of Activities Chief Internal Auditor Quarterly
Internal Audit Report Follow Up Chief Internal Auditor Quarterly
Internal Audit Reports to Audit and Scrutiny Committee  Chief Internal Auditor Quarterly
External Audit Progress Report Forvis Mazars Quarterly
Verbal Update by Chair(s) of Scrutiny Panel Chair and Vice Chair of Audit & Scrutiny
Committee  
Quarterly
PSIAS Self-Assessment  Chief Internal Auditor Annual
Corporate Complaints Annual Report 2023-24  Governance, Risk and Safety Manager Annual
Freedom of Information Annual Report 2023-24  Governance, Risk and Safety Manager Annual
Audit & Scrutiny Committee 2023/24 Annual Report  Audit & Scrutiny Committee Chair Annual
Strategic Risk Register – Assurance Mapping Chief Internal Auditor Annual
Strategic Risk Register Update  Chief Executive Annual
Proposed Approach to Consultations Scrutiny Review Chief Internal Auditor One-off
17 December 2024 Reports to Committee Services by 22 November 2024
Internal Audit and Counter Fraud Summary of Activities Chief Internal Auditor Quarterly
Internal Audit Report Follow Up Chief Internal Auditor Quarterly
Internal Audit Reports to Audit and Scrutiny Committee  Chief Internal Auditor Quarterly
Audit Progress Report Forvis Mazars Quarterly
Verbal Update by Chair(s) of Scrutiny Panel Chair and Vice Chair of Audit & Scrutiny
Committee  
Quarterly
Page 177
Agenda Item
15

Page 178

Audit & Scrutiny Committee Work Plan 2024 – 2025 
Performance Reporting Update (to include reference to LGBF) Chief Executive/Head of Customer Support
Services/HR & OD Manager
Quarterly
Council Annual Report 2024/25 Head of Customer Support Services Annual
Local Government in Scotland – Overview 2024 Audit Scotland (Lynsey to see if available and
download for agenda pack – see agenda June
2023)
Annual 
Audit Scotland Digital Exclusion National Performance Audit Head of Customer Support Services (Audit
Scotland/Mazars)
One-off
13 March 2025 Reports to Committee Services by 17 February 2025
Internal Audit and Counter Fraud Summary of Activities Chief Internal Auditor Quarterly
Internal Audit Report Follow Up Chief Internal Auditor Quarterly
Internal Audit Reports to Audit and Scrutiny Committee 2024/25 Chief Internal Auditor Quarterly
Verbal Update by Chair(s) of Scrutiny Panel Chair and Vice Chair of Audit & Scrutiny
Committee  
Quarterly
RIPSA Annual Report Governance and Risk Manager Annual
Internal Audit 2025/26 Plan Chief Internal Auditor Annual
2024/25 Unaudited Annual Accounts Preparation Plan and Timetable Head of Financial Services Annual
Treasury Management Strategy and Annual Investment Strategy Head of Financial Services Annual
Progress against Best Value Action Plan Update Chief Executive/Head of Customer Support
Services/HR&OD Manager
Annual
Internal Audit Charter and Internal Audit Manual Chief Internal Auditor Annual
Scrutiny Manual and Framework Update Chief Internal Auditor Annual
Audit Scotland Report – Financial Overview 2024/25  Head of Financial Services Annual
12 June 2025 Reports to Committee Services by 19 May 2025
Internal Audit and Counter Fraud Summary of Activities Chief Internal Auditor Quarterly
Internal Audit Report Follow Up Chief Internal Auditor Quarterly
Internal Audit Reports to Audit and Scrutiny Committee  Chief Internal Auditor Quarterly 
Verbal Update by Chair(s) of Scrutiny Panel Chair and Vice Chair of Audit & Scrutiny
Committee  
Quarterly
Page 178

Page 179

Audit & Scrutiny Committee Work Plan 2024 – 2025 
Internal Audit 2024-25 Annual Report  Chief Internal Auditor Annual
External Audit – 2024/25 Annual Plan Forvis Mazars Annual
Audit Strategy Memorandum Forvis Mazars Annual
Local Government Benchmarking Framework Report Head of Customer Support Services/HR & OD
Manager
Annual
Unaudited Financial Accounts Head of Financial Services Annual
Statement of Governance and Internal Control Governance, Risk and Safety Manager Annual 
Page 179

Page 180

This page is intentionally left blank