Democracy Spraffa

2024_25_InternalAudit_EducationMaintenanceAllowanceVerification_FinalReport

Argyll and Bute Council · 5 September 2024
Back to Audit and Scrutiny Committee — 5 September 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council
Internal Audit Report
June 2024
FINAL 
High Medium Low VFM
Number of
Findings
0 0 0 0 
Education Maintenance
Allowance-Verification Audit
Audit Opinion: High

Page 2

2 
Argyll and Bute Council – Internal Audit Report – EMA Verification audit, June 2024 
Contents 
1. Executive Summary ........................................................................................................................ 3
Introduction ............................................................................................................................................ 3
Background ............................................................................................................................................. 3
Scope ....................................................................................................................................................... 4
Risks ........................................................................................................................................................ 4
Audit Opinion ......................................................................................................................................... 4
2. Objectives and Summary Assessment ........................................................................................... 4
3. Detailed Findings ............................................................................................................................ 5
Appendix 1 – Audit Opinion ................................................................................................................... 7 
Contact Details 
Internal Auditor: Mhairi Weldon 
Telephone:  01546 604294 
e-mail:   Mhairi.weldon@argyll-bute.gov.uk 
www.argyll-bute.gov.uk

Page 3

3 
Argyll and Bute Council – Internal Audit Report – EMA Verification audit, June 2024
1. Executive Summary
Introduction
1. As part of the 2024/25 internal audit plan, approved by the Audit & Scrutiny Committee in
March 2024, we have undertaken an audit of Argyll and Bute Council’s (the Council) system of
internal control and governance in relation to Education maintenance Allowance (EMA)
Verification.
2. The audit was conducted in accordance with the Public Sector Internal Audit Standards (PSIAS)
with our conclusions based on discussions with council officers and the information available at
the time the fieldwork was performed. The findings outlined in this report are only those which
have come to our attention during the course of our normal audit work and are not necessarily
all the issues which may exist.  It is the responsibility of management to determine the extent of
the internal control system appropriate to the Council.
3. The contents of this report have been agreed with the appropriate council officers to confirm
factual accuracy and appreciation is due for the cooperation and assistance received from all
officers over the course of the audit.
Background
4. Regulation 3 of the Education Maintenance Allowances (Scotland) Regulations 2007 (“the 2007
Regulations”) allows the Scottish Ministers to pay an education maintenance allowance (EMA) to
provide support for eligible 16 to 19 year olds who are engaged in full-time education in school;
undertaking a course of non-advanced education at home which has been approved by the
education authority; or undertaking a course of non-advanced education elsewhere under the
supervision of the education authority (including Learning Agreements/Action Plans). The 2007
Regulations form the basis of the EMA programme which aims to increase participation and
retention in post-compulsory education, thus increasing skills and life chances for this group.
EMA payments are made by the Council to eligible young people in school and other types of
learning within the local authority area in accordance with the 2007 Regulations, and the EMA
(Scotland) Guidance and Processes, provided that a young person is eligible for EMA, that a
young person qualifies based on the EMA eligibility criteria and a signed learning agreement is in
place.
5. The EMA programme offers means-tested financial support of £30 per week in arrears during
term-time to eligible young people from low income households who are planning to continue in
post-compulsory education.  Eligibility for EMA payments depends on the young person's age,
household income, residency, course validity and completion of a learning agreement detailing
targets and attendance requirements.  
6. The Scottish Government (SG) reimburses the Council for payments made to young people
following submission of monthly grant claims and a year-end statement confirming the total of
the monthly claims.  A standard allowance for the costs of administering the programme as well
as an additional £15 for each new application processed is also paid by the SG.
7. Audit Scotland published technical guidelines, TGN/EMA/21 in March 2021 and this was used to
support auditors in the verification of EMA claims.

Page 4

4 
Argyll and Bute Council – Internal Audit Report – EMA Verification audit, June 2024
Scope 
8. The scope of the audit was to assess that the Council is fully compliant with requirements as set
out in the Offer of Grant for EMA 2023/24.
Risks
9.  The risks considered throughout the audit were:
• Audit Risk 1 – The Council fails to comply with the provisions set out in the Offer of grant
for EMA 2023-24
Audit Opinion
10. We provide an overall audit opinion for all the audits we conduct. This is based on our
judgement on the level of assurance which we can take over the established internal controls,
governance and management of risk as evidenced by our audit work.  Full details of the five
possible categories of audit opinion is provided in Appendix 1 to this report.
11. Our overall audit opinion for this audit is that we can take a high level of assurance.  This means
that, internal control, governance and the management of risk are at a high standard. Only
marginal elements of residual risk have been identified with these either being accepted or dealt
with. A sound system of control designed to achieve the system objectives is in place and being
applied consistently.
2. Objectives and Summary Assessment
12. Exhibit 1 sets out the control objectives identified during the planning phase of the audit and our
assessment against each objective.   
Control Objective Link to Risk Assessment Summary Conclusion
1 The year-end
statement has been
completed in
accordance with
guidance.
Audit Risk 1 High Appropriate arrangements are in place
to process applications and payments
and prepare and submit accurate
monthly claims and year-end
schedules.  All payments and costs
were confirmed on the Council’s
general ledger and verified on the
claims submitted.
2 Young people have
been correctly
assessed for
eligibility.
Audit Risk 1 High A detailed review of a sample of 10
young people confirmed that EMA was
appropriately awarded following
submission of the required evidence in
support of their applications.
3 Administration costs
have been
appropriately
applied.
Audit Risk 1 High The additional top-up administration
cost has been applied to the monthly
claims and correctly reflected in the
year-end claim.
4 Completion
procedures have
been appropriately
followed.
Audit Risk 1 High The claim forms submitted accurately
reflected payments made and costs
incurred in accordance with the terms
and conditions of the Offer of Grant.

Page 5

5 
Argyll and Bute Council – Internal Audit Report – EMA Verification audit, June 2024
Claims and supporting evidence were
reviewed, certified and confirmed to
Scottish Government. 
13. Further details of our conclusions against each control objective can be found in Section 3 of this
report.  
3. Detailed Findings
The year-end statement has been completed in accordance with guidance.
14. The Councils arrangements for the completion of the year end statement are adequate. All
relevant parts of the year end statement have been completed and signed by the Council’s
Executive Director/Section 95 Officer including schedules 4 to 6 as required in the Offer of Grant
for EMA 2023-24 letter.  
15. The entries on the year-end statement were reviewed and found to be consistent with the total
of the monthly claims submitted and also with entries lodged on the Council’s general ledger.
Young people have been correctly assessed for eligibility
16. A total of 189 young people were awarded EMA payments in 2023-24, from these, a random
sample of 10 was chosen for detailed review of supporting documentation to confirm they met
the eligibility criteria as set out below: 
• Proof of age to confirm young person is between 16 and 19 years of age
• Household income below £24,421 (one child) or £26,884 (more than one child)
• UK citizen or qualifying non-national who are resident in Argyll and Bute area
• Course(s) being undertaken is/are valid and require attendance of at least 21 hours per week
• An agreement has been completed detailing learning goals and level of attendance required 
• Attendance records confirming eligibility for each weekly payment made
• Back-payments were made in accordance with grant requirements 
17. Documentation provided confirmed that all young people within the sample selected for review
were appropriately awarded EMA following submission of the required evidence. 
Administration costs have been appropriately applied
18. The Council is in receipt of a flat rate of £25k for administering the EMA programme, in addition
to this, an administration cost of £15 per new applicant in receipt of at least one payment of
EMA is available to claim.  The administration cost was correctly applied to monthly claims, a
total of £3,045 was recovered from the SG in respect of this element and was found to be
consistent with the documented requirements.
Completion procedures have been appropriately followed
19.  Testing carried out confirmed that payments were made in accordance with the grant terms
and conditions and no adjustments required to be made.

Page 6

In order to assist management in using our reports a system of grading audit findings has been adopted to allow the significance of findings to be ascertained. 
The definitions of each classification are as follows: 
Grading    Definition
High  A major observation on high level controls and other important internal controls or a significant matter relating to the critical success of the
objectives of the system.  The weakness may therefore give rise to loss or error. 
Medium 
Observations on less significant internal controls and/or improvements to the efficiency and effectiveness of controls which will assist in meeting
the objectives of the system.  The weakness is not necessarily substantial however the risk of error would be significantly reduced if corrective
action was taken.  
Low  Minor recommendations to improve the efficiency and effectiveness of controls or an isolated issue subsequently corrected.  The weakness does
not appear to significantly affect the ability of the system to meet its objectives. 
VFM  An observation which does not highlight an issue relating to internal controls but represents a possible opportunity for the council to achieve
better value for money (VFM).

Page 7

7 
Argyll and Bute Council – Internal Audit Report – EMA Verification audit, June 2024
Appendix 1 – Audit Opinion 
Level of Assurance  Definition 
High  Internal control, governance and the management of risk are at a high standard. Only marginal elements of residual risk have
been identified with these either being accepted or dealt with. A sound system of control designed to achieve the system
objectives is in place and being applied consistently. 
Substantial  Internal control, governance and the management of risk is sound. However, there are minor areas of weakness which put some
system objectives at risk and specific elements of residual risk that are slightly above an acceptable level and need to be
addressed within a reasonable timescale. 
Reasonable 
Internal control, governance and the management of risk are broadly reliable. However, whilst not displaying a general trend,
there are areas of concern which have been identified where elements of residual risk or weakness may put some of the system
objectives at risk. 
Limited  Internal control, governance and the management of risk are displaying a general trend of unacceptable residual risk above an
acceptable level and placing system objectives are at risk. Weakness must be addressed with a reasonable timescale with
management allocating appropriate resources to the issues raised. 
No Assurance  Internal control, governance and the management of risk is poor. Significant residual risk and/or significant non-compliance with
basic controls exists leaving the system open to error, loss or abuse. Residual risk must be addressed immediately with
management allocating appropriate resources to the issues.