Democracy Spraffa

2024_25_InternalAudit_Culture_FinalReport

Argyll and Bute Council · 17 December 2024
Back to Audit and Scrutiny Committee — 17 December 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll & Bute Health & Social Care Partnership
Internal Audit Report
October 2024
FINAL 
High Medium Low VFM
Number of Findings 0 5 0 0 
Culture
Audit Opinion: Reasonable

Page 2

2 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Culture, October 2024 
Contents 
1. Executive Summary ........................................................................................................................ 3
Introduction ............................................................................................................................................ 3
Background ............................................................................................................................................. 3
Scope ....................................................................................................................................................... 4
Key Dates ................................................................................................................................................ 4
Risks ........................................................................................................................................................ 4
Audit Opinion ......................................................................................................................................... 4
Recommendations ................................................................................................................................. 4
2. Objectives and Summary Assessment ........................................................................................... 5
3. Detailed Findings ............................................................................................................................ 6
Appendix 1 – Action Plan ..................................................................................................................... 10
Appendix 2 – Audit Opinion ................................................................................................................. 13 
Contact Details 
Internal Auditor: Moira Weatherstone 
Telephone:  01546 604146 
e-mail:   moira.weatherstone@argyll-bute.gov.uk 
www.argyll-bute.gov.uk

Page 3

3 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Culture, October 2024
1. Executive Summary
Introduction
1. As part of the 2024/25 internal audit plan, approved by the Audit & Risk Committee in April
2024, we have undertaken an audit of Argyll & Bute Health & Social Care Partnership (HSCP)
system of internal control and governance in relation to Culture. 
2. The audit was conducted in accordance with the Public Sector Internal Audit Standards (PSIAS)
with our conclusions based on discussions with Health & Social Care Partnership officers and the
information available at the time the fieldwork was performed. The findings outlined in this
report are only those which have come to our attention during the course of our normal audit
work and are not necessarily all the issues which may exist. Appendix 1 to this report includes
agreed actions to strengthen internal control however it is the responsibility of management to
determine the extent of the internal control system appropriate to the HSCP. 
3. The contents of this report have been agreed with the appropriate Health & Social Care
Partnership officers to confirm factual accuracy and appreciation is due for the cooperation and
assistance received from all officers over the course of the audit.
Background
4. The culture of an organisation drives how it conducts its business.  Organisational culture is the
set of shared values, beliefs, attitudes, systems and rules that outline and influence behaviour
within the organisation.  In addition, it reflects both the written and unwritten rules that people
in the organisation should follow.   
5. A positive organisational culture is often identified by open communication, mutual respect,
shared commitment to the achievement of common goals and a commitment to growth and
development. A positive, open culture supports the organisation’s attainment of its goals and
objectives because it generally creates a more enjoyable place to work, enhances productivity,
and leads to overall improved performance in addition to reducing risk exposure. Whilst poor
organisational culture has been identified as the root cause of many serious issues across
organisations. 
6. The HSCP have formed a Culture and Wellbeing Group which continue to meet to progress local,
board and council wide initiatives. They focus on; employee engagement, culture monitoring,
learning and development, management development, wellbeing promotion, communication,
systems and processes and improving data capture to inform decisions. The Council’s wellbeing
team are a key contributor to this group and stronger links are being forged between the Council
and NHS wellbeing teams and resources. 
7. In addition, NHS have developed the Culture and Leadership framework which was approved by
the Culture Oversight Group (COG) in October 2023. This outlines a four phase project plan
focussing on Our Learning System, Leadership and Management Development and Colleague
Development. The plan prioritises those interventions which are expected to have greatest
impact on the behavioural and cultural changes the HCSP seek.

Page 4

4 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Culture, October 2024
Scope 
8. The scope of the audit was to assess organisational culture across NHS and LG via any recent
staff survey results and review the progress being made by the A&B HSCP Culture Group as
outlined in the Terms of Reference agreed with the Chief Officer on 11 June 2024. 
Key Dates
9. The Terms of Reference provided provisional timescales for the review to take place, the actual
dates are noted below. 
Exhibit 1 – Key Dates
Stage Actual
Date
Terms of Reference agreed 11 June 2024
Fieldwork Commencement 11 June 2024
Draft Report issued 13 August 2024
Management Comments received 19 August 2024
Final Report issued 2 October 2024
Audit and Risk Committee 17 December 2024 
Risks
10.  The risks considered throughout the audit were:
 SRR08: Equalities
 Audit Risk 1: failure to progress key objectives identified by the Culture Group
 Audit Risk 2: failure to identify and assess any areas for improvement identified through
the staff survey 
 Audit Risk 3: failure to report progress to relevant staff and committees
Audit Opinion
11. We provide an overall audit opinion for all the audits we conduct. This is based on our
judgement on the level of assurance which we can take over the established internal controls,
governance and management of risk as evidenced by our audit work.  Full details of the five
possible categories of audit opinion is provided in Appendix 2 to this report. 
12. Our overall audit opinion for this audit is that we can take a reasonable level of assurance.  This
means that internal control, governance and the management of risk are broadly reliable.
However, whilst not displaying a general trend, there are areas of concern which have been
identified where elements of residual risk or weakness may put some of the system objectives at
risk.
Recommendations
13. We have highlighted 5 medium priority recommendations where we believe there is scope to
strengthen the control and governance environment. These are summarised below:

Page 5

5 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Culture, October 2024
 Consideration should be given as to how staff surveys could focus on specific issues
relating to the HSCP in order to assess the culture within the HSCP
 The work plan should be updated to reflect priorities within the HSCP that are focussed,
measurable, have clear outcomes and target completion dates
 Progress against the work plan should be clearly recorded within the work plan
 Consideration should be given to how the HSCP can better communicate with staff
across both organisations to encourage staff to participate and share their views in
surveys
 Whilst it is acknowledged that proportionately the NHS have larger number of staff
consideration should be given to how a balance of staff between NHS Highland and the
Council could be represented on the Culture and Wellbeing Group
14. Full details of the audit findings, recommendations and management responses can be found in
Section 3 of this report and in the action plan at Appendix 1.
2. Objectives and Summary Assessment
15. Exhibit 1 sets out the control objectives identified during the planning phase of the audit and our
assessment against each objective.  
Exhibit 2 – Summary Assessment of Control Objectives 
Control Objective Link to Risk Assessment Summary Conclusion
1 The Culture Group
has identified and
prioritised key areas
for development
and improvement
SRR08 Reasonable The HSCP Culture & Wellbeing Group
have developed a work plan, dated
2023, which outlines priorities,
outcomes, responsible person and
timeframes.  However, these are not
specific, targeted or in some instances
easily measurable with target dates for
completion marked as ‘ongoing’.
Regular staff surveys are undertaken
by both employers and are used to
provide information on the health of
the organisations and inform the
Group.  Whilst participation in the NHS
staff surveys tend to be higher and are
improving, Council staff participation in
surveys tends to be low. It is
recognised that there are challenges in
so far as the HSCP does not employ
staff and that staff within the HSCP are
part of two very separate organisations
with their own cultures. The surveys
issued focus on the culture within
either the NHS Highland or the Council.  
2 The Culture Group is
monitoring progress
against areas
identified for
Audit Risk 1
Audit Risk 2
Substantial The group is monitoring progress
against the work plan which was
approved in 2023.  Progress reports
are updated at Culture Group meetings
and recorded in the notes of the

Page 6

6 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Culture, October 2024
development and
improvement
meeting. However, there does not
seem to be progress notes assigned to
the work plan therefore difficult to
assess, without reading every meeting
note what progress has made.
3 The Culture Group
meets on a regular
basis and provides
reports and updates
to relevant staff and
committees
Audit risk 3 Substantial The Culture Group meets on a regular
basis.  The Terms of Reference for the
Culture and Wellbeing group were
created in June 2022 with the most
recent update in May 2023. Initially to
get momentum going the group met 4
weekly, however, it was felt to be too
often and it was agreed to meet
bimonthly. In 2023 the Group met
most months, with the exception on a
few months when meetings were
cancelled.  Updates from the Culture
Group are reported to the Senior
Management Team (SLT) and the IJB,
with minutes of the IJB available to
assess on the website.  Reliance is
placed on managers attending the
Culture Group feeding back
information to their teams.   
16. Further details of our conclusions against each control objective can be found in Section 3 of this
report.  
3. Detailed Findings
The Culture Group has identified and prioritised key areas for development and improvement
17. Culture and wellbeing became a high priority following the Sturrock report which identified
areas of concern within the NHS relating to the culture within the organisation. In November
2019, as recommended in the Sturrock Review report, NHS Highland Board commissioned an
independent company to carry out a survey for colleagues working in Argyll & Bute. As a result
of the Sturrock Report the Culture Oversight group was formed reporting to the Integrated Joint
Board (IJB). It was reported in 2020 that the NHS had made good progress with developing an
updated Culture Plan.  This has evolved and developed since 2020, with the introduction of a
Culture & Wellbeing Group (the Group) for the HSCP.   
18. Argyll & Bute Culture and Wellbeing Group was formed to support the wellbeing of staff and
cultural change across the HSCP and ensure that wellbeing is at the heart of our HSCP culture. 
The Culture and Wellbeing Group, provides an integrated HSCP forum for staff to discuss,
influence, develop and monitor culture and wellbeing across the partnership, specifically; 
 to oversee the delivery of an action plan taking ownership for continuous improvement
in the areas of culture and wellbeing;

Page 7

7 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Culture, October 2024
 ensure that the HSCP continue to reflect on the learning from previous reviews while
ensuring the HSCP are focussed on meeting the current and future needs of our
integrated staff group;
 to support and highlight activities undertaken by both employing bodies (HSCP and the
Council) to support a positive culture and working environment. 
19. Regular staff surveys are undertaken by both employers and are used to provide information on
the health of the organisations and inform the Group.  The staff surveys undertaken are: 
 The ‘I matter’ survey is issued to staff on an annual basis across both the NHS and the
Council.  This survey focusses on employee experience in relation to their job role, team,
relationship with management, decision making and health and wellbeing.  The
response rate in 2024 was 50%.  However, we were advised that ‘I matter’ response
rates had improved year on year:  2022 - 31% 2023 - 48% and 2024 - 50%. 
 Within the Council quality conversations are at the heart of how the Council do business.
Having the skills and confidence to engage in quality conversations with colleagues,
partners and communities is one of the Council’s key priorities. In order to measure the
success and impact of the programme the Council agreed to conduct an annual survey
and report on the findings each year.  Line managers were also surveyed as it is
important to hear about their experience of leading and engaging in quality
conversations within their teams. The report, dated 5th June 2024 showed the
completion rate across the HSCP services: 
20. In addition the Council conducted an Employee Experience Survey in 2024 with 587 staff
completing the survey.  The survey results were issued to all Council staff and staff were invited
to join a focus group with groups consisting of 12-15 people from the same job type the aim was
to talk in more detail about what improvements could look like for their area of work. 
21. It is recognised that there are challenges in so far as the HSCP does not employ staff and that
staff within the HSCP are part of two very separate organisations with their own cultures. The
surveys issued tend focus on the culture within either the NHS Highland or the Council. 
Previously there were listening and learning exercises (the last results report dated 2021) which
employees of NHS Highland and Argyll and Bute Council working in the HSCP were encouraged
Service No of
employees in
service
No of
employees
who
responded
% Response
rate
Adult Services Health and Community
Care  349 16 5%
Adult Services Acute and Complex  122 13 11%
Children, Families & Justice 290  26 9%
Strategic, Planning & Performance  18 6 33%
Total 779 61

Page 8

8 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Culture, October 2024
to participate in. This survey fed into action plans and more recently resulted in a report being
issued - ‘You Said, We Did’. Recent surveys undertaken by each organisation do not focus
specifically on the HSCP in terms of culture (how are the service working together,
communicating with each other, sharing information), instead focussing on staff experiences in
each organisation. 
Action Plan 1 
22. The HSCP Culture & Wellbeing Group have developed a work plan, dated 2023, which outlines
priorities, outcomes, responsible person and timeframes.  However, these are not specific,
targeted or in some instances easily measurable with target dates for completion marked as
‘ongoing’.     
Action Plan 2 
23. Approved by the Culture Oversight Group (COG), in October 2023, “Our Culture and Leadership
Framework” proposal paper was developed collaboratively by colleagues within Education,
Learning & Development, and Organisational Development teams. This outlines a 4 phase
project plan focussing on: Our Learning System, Leadership and Management Development and
Colleague Development.   Phase 1 was concluded in March 2024, with phase 2 now well
underway.  The document was brought together by NHS and focusses on their priorities,
however, the framework sets out how the HSCP seek to achieve the behavioural changes that
lead to the cultural changes they seek.    Feedback from module participants, data from OD
casework and facilitator feedback have all been considered to establish next steps for each of
the following tasks: 
 Leadership and Culture Framework: Development and approval of a framework that
sets out how we seek to achieve the behavioural changes that lead to the cultural
changes we seek
 Leadership and Management Development Programme : Development and delivery of
an updated programme to include new modules that the COG prioritise as having the
most impact on behavioural and cultural change
 Staff (Colleague) Development Programme: Development and delivery of an updated
programme to include new modules that the COG prioritise as having the most impact
on behavioural and cultural change. 
24. Time frames have been established for each of the 4 phases, with completion in March 2027: 
 Phase I: September 2023 – March 2024
 Phase 2: April 2024-March 2025
 Phase 3: April 2025 – March 2026
 Phase 4: April 2026 – March 2027
The Culture Group is monitoring progress against areas identified for development and
improvement
25. The group is monitoring progress against the work plan which was approved in 2023.  Progress
reports are updated at Culture Group meetings and recorded in the notes of the meeting.
However, there does not seem to be progress notes assigned to the work plan therefore difficult

Page 9

9 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Culture, October 2024
to assess, without reading every meeting note what progress has made. In addition as noted
above a number of targets dates are simply noted as ‘ongoing’.            
Action Plan 3
The Culture Group meets on a regular basis and provides reports and updates to relevant staff
and committees
26. The Culture Group meets on a regular basis.  The Terms of Reference for the Culture and
Wellbeing group were created in June 2022 with the most recent update in May 2023. Initially to
get momentum going the group met 4 weekly, however, it was felt to be too often and it was
agreed to meet bimonthly. In 2023 the Group met most months, with the exception on a few
months when meetings were cancelled. 
27. Updates from the Culture Group are reported to the Senior Management Team (SLT) and the IJB,
with minutes of the IJB available on the website.  Reliance is placed on managers attending the
Culture Group feeding back information to their teams.   
28. Within the Work Plan 2023 there are identified outcomes with regards to improving
communication channels and how to ensure that all staff views within the HSCP are heard.  The
results of surveys have demonstrated engagement and participation by HSCP staff could be
improved. 
29. It is acknowledged that there are still a large amount of staff that are non-networked and
therefore there are challenges to sharing information and to allow staff easy access to online
surveys. There have been a number of imaginative initiatives to engage with non-networked
staff for example posters and QR codes containing links.  In addition ‘My Council Works’ has
been developed.  This is the new, open to all hub – which mean NHS staff and non-networked
employees can easily access it on their smart phones or personal laptops. This is facilitating a
greater ability to communicate with staff across the HSCP.  The HUB contains, staff news/Health
and Wellbeing information/HR information /learning material/policies and procedures. 
Action Plan 4 
30. Whilst the Culture Group is open to all staff across the HSCP, there is a greater proportion of
representation of NHS staff. Whilst it is acknowledged that proportionately the NHS have larger
number of staff than the Council, consideration should be given to how a balance of staff
between NHS Highland and the Council could be represented on the Culture and Wellbeing
Group.                       
Action Plan 5

Page 10

Appendix 1 – Action Plan 
No Finding Risk Agreed Action Responsibility / Due Date
Medium 
1 Surveys 
Recent surveys undertaken by each organisation do not
focus specifically on the HSCP in terms of culture (how are
the services working together, communicating with each
other, sharing information), instead focussing on staff
experiences in each organisation.
Priorities are set based
on cultures within NHS
Highland and the
Council rather than
within the HSCP  
HR leads within ABC and
NHSH to review survey
landscape and explore
joint survey option over
and above existing
employer only surveys.
To report to SLT and JPF
Depute Director of People,
NHS Highland 
March 2025 
Medium
2 Work Plan 
The work plan outlines priorities, outcomes, responsible
person and timeframes.  However, these are not specific,
targeted or in some instances easily measurable with
target dates for completion marked as ‘ongoing’.
Lack of clear identifiable
outcomes and
completion dates
Refresh and review of
the remit and purpose
of the Culture Group. 
The work plan will be
included as part of the
review to focus on
meaningful action and
timescales
Depute Director of People,
NHS Highland 
March 2025
Medium
3 Monitoring Progress 
There does not seem to be progress notes assigned to the
work plan therefore difficult to assess, without reading
every meeting note what progress has made. In addition
as noted above a number of targets dates are simply
noted as ‘ongoing’.
Target dates for
completion are missed
Refresh and review of
the remit and purpose
of the Culture Group to
include timescales and
progress reporting as
appropriate
Depute Director of People,
NHS Highland 
March 2025

Page 11

11 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Culture, October 2024
Medium
4 Survey Participation 
The results of surveys have demonstrated engagement
and participation by HSCP staff could be improved.
Unrepresentative views
of the organisation
Chief Officer to
communicate
commencement of
surveys to all staff via
CO comms
Chief Officer 
March 2025
Medium
5 Culture and Wellbeing Group 
Whilst the Culture Group is open to all staff across the
HSCP, there is a greater proportion of representation of
NHS staff.
Bias of views and
opinions based on one
organisation
As per refresh and
review of Culture
Group, review
membership as a result
of revised remit and
purpose 
Depute Director of People,
NHS Highland 
March 2025

Page 12

12 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Culture, October 2024
In order to assist management in using our reports a system of grading audit findings has been adopted to allow the significance of findings to be ascertained. 
The definitions of each classification are as follows: 
Grading    Definition
High  A major observation on high level controls and other important internal controls or a significant matter relating to the critical success of the
objectives of the system.  The weakness may therefore give rise to loss or error. 
Medium 
Observations on less significant internal controls and/or improvements to the efficiency and effectiveness of controls which will assist in meeting
the objectives of the system.  The weakness is not necessarily substantial however the risk of error would be significantly reduced if corrective
action was taken.  
Low  Minor recommendations to improve the efficiency and effectiveness of controls or an isolated issue subsequently corrected.  The weakness does
not appear to significantly affect the ability of the system to meet its objectives. 
VFM  An observation which does not highlight an issue relating to internal controls but represents a possible opportunity for the HSCP to achieve better
value for money (VFM).

Page 13

13 
Argyll & Bute Health & Social Care Partnership – Internal Audit Report – Culture, October 2024
Appendix 2 – Audit Opinion 
Level of Assurance  Definition 
High 
Internal control, governance and the management of risk are at a high standard. Only marginal elements of residual risk have
been identified with these either being accepted or dealt with. A sound system of control designed to achieve the system
objectives is in place and being applied consistently. 
Substantial 
Internal control, governance and the management of risk is sound. However, there are minor areas of weakness which put some
system objectives at risk and specific elements of residual risk that are slightly above an acceptable level and need to be
addressed within a reasonable timescale. 
Reasonable 
Internal control, governance and the management of risk are broadly reliable. However, whilst not displaying a general trend,
there are areas of concern which have been identified where elements of residual risk or weakness may put some of the system
objectives at risk. 
Limited 
Internal control, governance and the management of risk are displaying a general trend of unacceptable residual risk above an
acceptable level and placing system objectives are at risk. Weakness must be addressed with a reasonable timescale with
management allocating appropriate resources to the issues raised. 
No Assurance 
Internal control, governance and the management of risk is poor. Significant residual risk and/or significant non-compliance with
basic controls exists leaving the system open to error, loss or abuse. Residual risk must be addressed immediately with
management allocating appropriate resources to the issues.